{
 "documentInfo": {
  "documentType": "https://xbrl.org/2021/xbrl-json",
  "features": {
   "xbrl:canonicalValues": true
  },
  "namespaces": {
   "bhp": "http://bhp.com/xbrl/2022",
   "ifrs-full": "http://xbrl.ifrs.org/taxonomy/2021-03-24/ifrs-full",
   "iso4217": "http://www.xbrl.org/2003/iso4217",
   "scheme": "http://standards.iso.org/iso/17442",
   "xbrl": "https://xbrl.org/2021",
   "xbrli": "http://www.xbrl.org/2003/instance"
  },
  "taxonomy": [
   "http://bhp.com/xbrl/2022/WZE1WSENV6JSZFK0JC28-2023-06-30.xsd"
  ]
 },
 "facts": {
  "fact-1": {
   "value": "We\u2019ve positioned our business to support the megatrends shaping our world. Copper for renewable energy. Nickel for electric vehicles. Iron ore and higher-quality metallurgical coal for steel for new infrastructure. And we are moving into potash to support more sustainable farming. A resource mix for today \u2013 and critical to the future.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfNatureOfEntitysOperationsAndPrincipalActivities",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-7": {
   "value": "53817000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Revenue",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-8": {
   "value": "65098000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Revenue",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-9": {
   "value": "56921000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Revenue",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-10": {
   "value": "394000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-11": {
   "value": "1398000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-12": {
   "value": "380000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-13": {
   "value": "31873000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OperatingExpense",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-14": {
   "value": "32371000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OperatingExpense",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-15": {
   "value": "30871000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OperatingExpense",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-16": {
   "value": "594000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ShareOfProfitLossFromEquityAccountedInvestmentsRelatedImpairmentsAndExpenses",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-17": {
   "value": "-19000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ShareOfProfitLossFromEquityAccountedInvestmentsRelatedImpairmentsAndExpenses",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-18": {
   "value": "-915000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ShareOfProfitLossFromEquityAccountedInvestmentsRelatedImpairmentsAndExpenses",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-19": {
   "value": "22932000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-20": {
   "value": "34106000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-21": {
   "value": "25515000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-22": {
   "value": "2060000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceCosts",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-23": {
   "value": "1050000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceCosts",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-24": {
   "value": "1290000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceCosts",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-25": {
   "value": "529000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-26": {
   "value": "81000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-27": {
   "value": "67000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-28": {
   "value": "-1531000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceIncomeCost",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-29": {
   "value": "-969000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceIncomeCost",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-30": {
   "value": "-1223000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceIncomeCost",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-31": {
   "value": "21401000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-32": {
   "value": "33137000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-33": {
   "value": "24292000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-34": {
   "value": "6691000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncomeTaxExpenseFromContinuingOperationsExcludingRoyaltyrelatedTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-35": {
   "value": "10430000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncomeTaxExpenseFromContinuingOperationsExcludingRoyaltyrelatedTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-36": {
   "value": "10376000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncomeTaxExpenseFromContinuingOperationsExcludingRoyaltyrelatedTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-37": {
   "value": "386000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:RoyaltyrelatedTaxationNetOfIncomeTaxBenefit",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-38": {
   "value": "307000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:RoyaltyrelatedTaxationNetOfIncomeTaxBenefit",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-39": {
   "value": "240000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:RoyaltyrelatedTaxationNetOfIncomeTaxBenefit",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-40": {
   "value": "7077000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxExpenseContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-41": {
   "value": "10737000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxExpenseContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-42": {
   "value": "10616000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxExpenseContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-43": {
   "value": "14324000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-44": {
   "value": "22400000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-45": {
   "value": "13676000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-46": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromDiscontinuedOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-47": {
   "value": "10655000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromDiscontinuedOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-48": {
   "value": "-225000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromDiscontinuedOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-49": {
   "value": "14324000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-50": {
   "value": "33055000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-51": {
   "value": "13451000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-52": {
   "value": "1403000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToNoncontrollingInterests",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-53": {
   "value": "2155000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToNoncontrollingInterests",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-54": {
   "value": "2147000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToNoncontrollingInterests",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-55": {
   "value": "12921000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToOwnersOfParent",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-56": {
   "value": "30900000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToOwnersOfParent",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-57": {
   "value": "11304000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToOwnersOfParent",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-58": {
   "value": "2.552",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:BasicEarningsLossPerShare",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-59": {
   "value": "6.106",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:BasicEarningsLossPerShare",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-60": {
   "value": "2.235",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:BasicEarningsLossPerShare",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-61": {
   "value": "2.547",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:DilutedEarningsLossPerShare",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-62": {
   "value": "6.093",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:DilutedEarningsLossPerShare",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-63": {
   "value": "2.23",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:DilutedEarningsLossPerShare",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-64": {
   "value": "2.552",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:BasicEarningsLossPerShareFromContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-65": {
   "value": "4",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:BasicEarningsLossPerShareFromContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-66": {
   "value": "2.28",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:BasicEarningsLossPerShareFromContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-67": {
   "value": "2.547",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:DilutedEarningsLossPerShareFromContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-68": {
   "value": "3.992",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:DilutedEarningsLossPerShareFromContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-69": {
   "value": "2.275",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:DilutedEarningsLossPerShareFromContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-70": {
   "value": "14324000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-71": {
   "value": "33055000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-72": {
   "value": "13451000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-73": {
   "value": "95000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:GainsLossesOnCashFlowHedgesBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-74": {
   "value": "-914000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:GainsLossesOnCashFlowHedgesBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-75": {
   "value": "863000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:GainsLossesOnCashFlowHedgesBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-76": {
   "value": "148000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ReclassificationAdjustmentsOnCashFlowHedgesBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-77": {
   "value": "-881000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ReclassificationAdjustmentsOnCashFlowHedgesBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-78": {
   "value": "837000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ReclassificationAdjustmentsOnCashFlowHedgesBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-79": {
   "value": "35000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:LossTransferredToInitialCarryingAmountOfHedgedItem",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-80": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:LossTransferredToInitialCarryingAmountOfHedgedItem",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-81": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:LossTransferredToInitialCarryingAmountOfHedgedItem",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-82": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:GainsLossesOnExchangeDifferencesOnTranslationBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-83": {
   "value": "-5000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:GainsLossesOnExchangeDifferencesOnTranslationBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-84": {
   "value": "5000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:GainsLossesOnExchangeDifferencesOnTranslationBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-85": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ReclassificationAdjustmentsOnExchangeDifferencesOnTranslationBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-86": {
   "value": "54000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ReclassificationAdjustmentsOnExchangeDifferencesOnTranslationBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-87": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ReclassificationAdjustmentsOnExchangeDifferencesOnTranslationBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-88": {
   "value": "-5000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxRelatingToComponentsOfOtherComprehensiveIncomeThatWillBeReclassifiedToProfitOrLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-89": {
   "value": "-10000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxRelatingToComponentsOfOtherComprehensiveIncomeThatWillBeReclassifiedToProfitOrLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-90": {
   "value": "8000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxRelatingToComponentsOfOtherComprehensiveIncomeThatWillBeReclassifiedToProfitOrLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-91": {
   "value": "-13000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeThatWillBeReclassifiedToProfitOrLossNetOfTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-92": {
   "value": "-82000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeThatWillBeReclassifiedToProfitOrLossNetOfTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-93": {
   "value": "23000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeThatWillBeReclassifiedToProfitOrLossNetOfTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-94": {
   "value": "-18000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeBeforeTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-95": {
   "value": "24000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeBeforeTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-96": {
   "value": "58000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeBeforeTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-97": {
   "value": "17000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-98": {
   "value": "-8000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-99": {
   "value": "-2000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-100": {
   "value": "-7000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxRelatingToComponentsOfOtherComprehensiveIncomeThatWillNotBeReclassifiedToProfitOrLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-101": {
   "value": "9000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxRelatingToComponentsOfOtherComprehensiveIncomeThatWillNotBeReclassifiedToProfitOrLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-102": {
   "value": "20000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxRelatingToComponentsOfOtherComprehensiveIncomeThatWillNotBeReclassifiedToProfitOrLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-103": {
   "value": "6000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeThatWillNotBeReclassifiedToProfitOrLossNetOfTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-104": {
   "value": "7000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeThatWillNotBeReclassifiedToProfitOrLossNetOfTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-105": {
   "value": "36000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeThatWillNotBeReclassifiedToProfitOrLossNetOfTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-106": {
   "value": "-7000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-107": {
   "value": "-75000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-108": {
   "value": "59000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-109": {
   "value": "14317000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-110": {
   "value": "32980000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-111": {
   "value": "13510000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-112": {
   "value": "1400000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToNoncontrollingInterests",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-113": {
   "value": "2160000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToNoncontrollingInterests",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-114": {
   "value": "2158000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToNoncontrollingInterests",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-115": {
   "value": "12917000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToOwnersOfParent",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-116": {
   "value": "30820000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToOwnersOfParent",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-117": {
   "value": "11352000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToOwnersOfParent",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-118": {
   "value": "12428000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-119": {
   "value": "17236000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-120": {
   "value": "4594000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherCurrentReceivables",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-121": {
   "value": "5426000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherCurrentReceivables",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-122": {
   "value": "470000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentFinancialAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-123": {
   "value": "629000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentFinancialAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-124": {
   "value": "5220000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Inventories",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-125": {
   "value": "4935000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Inventories",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-126": {
   "value": "508000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxAssetsCurrent",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-127": {
   "value": "263000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxAssetsCurrent",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-128": {
   "value": "131000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentNonfinancialAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-129": {
   "value": "175000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentNonfinancialAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-130": {
   "value": "23351000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-131": {
   "value": "28664000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-132": {
   "value": "148000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentReceivables",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-133": {
   "value": "153000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentReceivables",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-134": {
   "value": "1115000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentFinancialAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-135": {
   "value": "802000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentFinancialAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-136": {
   "value": "1403000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentInventories",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-137": {
   "value": "1315000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentInventories",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-138": {
   "value": "71818000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PropertyPlantAndEquipment",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-139": {
   "value": "61295000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PropertyPlantAndEquipment",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-140": {
   "value": "1610000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IntangibleAssetsAndGoodwill",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-141": {
   "value": "1369000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IntangibleAssetsAndGoodwill",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-142": {
   "value": "1620000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:InvestmentAccountedForUsingEquityMethod",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-143": {
   "value": "1420000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:InvestmentAccountedForUsingEquityMethod",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-144": {
   "value": "56000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-145": {
   "value": "56000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-146": {
   "value": "175000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentNonfinancialAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-147": {
   "value": "92000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentNonfinancialAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-148": {
   "value": "77945000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-149": {
   "value": "66502000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-150": {
   "value": "101296000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Assets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-151": {
   "value": "95166000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Assets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-152": {
   "value": "6296000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherCurrentPayables",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-153": {
   "value": "6687000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherCurrentPayables",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-154": {
   "value": "7173000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentBorrowingsAndCurrentPortionOfNoncurrentBorrowings",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-155": {
   "value": "2622000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentBorrowingsAndCurrentPortionOfNoncurrentBorrowings",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-156": {
   "value": "402000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentFinancialLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-157": {
   "value": "579000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentFinancialLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-158": {
   "value": "611000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxLiabilitiesCurrent",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-159": {
   "value": "3032000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxLiabilitiesCurrent",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-160": {
   "value": "4514000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentProvisions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-161": {
   "value": "3965000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentProvisions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-162": {
   "value": "47000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentDeferredIncomeOtherThanCurrentContractLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-163": {
   "value": "34000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentDeferredIncomeOtherThanCurrentContractLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-164": {
   "value": "19043000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-165": {
   "value": "16919000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-166": {
   "value": "4000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentPayables",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-167": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentPayables",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-168": {
   "value": "15172000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:LongtermBorrowings",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-169": {
   "value": "13806000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:LongtermBorrowings",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-170": {
   "value": "2157000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentFinancialLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-171": {
   "value": "1997000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentFinancialLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-172": {
   "value": "68000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxLiabilitiesNoncurrent",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-173": {
   "value": "87000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxLiabilitiesNoncurrent",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-174": {
   "value": "4299000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-175": {
   "value": "3063000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-176": {
   "value": "11973000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentProvisions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-177": {
   "value": "10478000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentProvisions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-178": {
   "value": "50000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentDeferredIncomeOtherThanNoncurrentContractLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-179": {
   "value": "50000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentDeferredIncomeOtherThanNoncurrentContractLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-180": {
   "value": "33723000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-181": {
   "value": "29481000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-182": {
   "value": "52766000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Liabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-183": {
   "value": "46400000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Liabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-184": {
   "value": "48530000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NetAssetsLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-185": {
   "value": "48766000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NetAssetsLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-186": {
   "value": "4737000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssuedCapital",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-187": {
   "value": "4638000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssuedCapital",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-188": {
   "value": "41000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:TreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-189": {
   "value": "31000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:TreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-190": {
   "value": "13000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherReserves",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-191": {
   "value": "12000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherReserves",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-192": {
   "value": "39787000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:RetainedEarnings",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-193": {
   "value": "40338000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:RetainedEarnings",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-194": {
   "value": "44496000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:EquityAttributableToOwnersOfParent",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-195": {
   "value": "44957000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:EquityAttributableToOwnersOfParent",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-196": {
   "value": "4034000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncontrollingInterests",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-197": {
   "value": "3809000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncontrollingInterests",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-198": {
   "value": "48530000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-199": {
   "value": "48766000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-200": {
   "value": "21401000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-201": {
   "value": "33137000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-202": {
   "value": "24292000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossBeforeTax",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-203": {
   "value": "5061000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDepreciationAndAmortisationExpense",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-204": {
   "value": "5683000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDepreciationAndAmortisationExpense",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-205": {
   "value": "5084000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDepreciationAndAmortisationExpense",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-206": {
   "value": "75000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForImpairmentLossReversalOfImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-207": {
   "value": "515000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForImpairmentLossReversalOfImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-208": {
   "value": "2507000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForImpairmentLossReversalOfImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-209": {
   "value": "-1531000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFinanceIncomeCost",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-210": {
   "value": "-969000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFinanceIncomeCost",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-211": {
   "value": "-1223000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFinanceIncomeCost",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-212": {
   "value": "-594000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:AdjustmentsForShareOfProfitLossFromEquityAccountedInvestmentsRelatedImpairmentsAndExpenses",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-213": {
   "value": "19000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:AdjustmentsForShareOfProfitLossFromEquityAccountedInvestmentsRelatedImpairmentsAndExpenses",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-214": {
   "value": "915000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:AdjustmentsForShareOfProfitLossFromEquityAccountedInvestmentsRelatedImpairmentsAndExpenses",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-215": {
   "value": "546000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherAdjustmentsToReconcileProfitLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-216": {
   "value": "-350000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherAdjustmentsToReconcileProfitLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-217": {
   "value": "573000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherAdjustmentsToReconcileProfitLoss",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-218": {
   "value": "867000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInTradeAndOtherReceivables",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-219": {
   "value": "-703000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInTradeAndOtherReceivables",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-220": {
   "value": "-2389000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInTradeAndOtherReceivables",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-221": {
   "value": "-44000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInInventories",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-222": {
   "value": "-865000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInInventories",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-223": {
   "value": "-405000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInInventories",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-224": {
   "value": "-1086000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncreaseDecreaseInTradeAndOtherPayables",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-225": {
   "value": "727000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncreaseDecreaseInTradeAndOtherPayables",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-226": {
   "value": "1149000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncreaseDecreaseInTradeAndOtherPayables",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-227": {
   "value": "131000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:AdjustmentsForIncreaseDecreaseInProvisionsAndOtherAssetsAndLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-228": {
   "value": "-248000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:AdjustmentsForIncreaseDecreaseInProvisionsAndOtherAssetsAndLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-229": {
   "value": "486000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:AdjustmentsForIncreaseDecreaseInProvisionsAndOtherAssetsAndLiabilities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-230": {
   "value": "27888000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-231": {
   "value": "38884000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-232": {
   "value": "33435000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-233": {
   "value": "347000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsReceivedClassifiedAsOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-234": {
   "value": "1018000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsReceivedClassifiedAsOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-235": {
   "value": "728000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsReceivedClassifiedAsOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-236": {
   "value": "545000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:InterestReceivedClassifiedAsOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-237": {
   "value": "58000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:InterestReceivedClassifiedAsOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-238": {
   "value": "97000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:InterestReceivedClassifiedAsOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-239": {
   "value": "1090000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:InterestPaidClassifiedAsOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-240": {
   "value": "657000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:InterestPaidClassifiedAsOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-241": {
   "value": "766000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:InterestPaidClassifiedAsOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-242": {
   "value": "331000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ProceedsSettlementsOfCashManagementRelatedInstruments",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-243": {
   "value": "378000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ProceedsSettlementsOfCashManagementRelatedInstruments",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-244": {
   "value": "-401000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ProceedsSettlementsOfCashManagementRelatedInstruments",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-245": {
   "value": "232000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxesRefundClassifiedAsOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-246": {
   "value": "105000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxesRefundClassifiedAsOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-247": {
   "value": "222000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxesRefundClassifiedAsOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-248": {
   "value": "9552000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxesPaidClassifiedAsOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-249": {
   "value": "10501000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxesPaidClassifiedAsOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-250": {
   "value": "7432000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxesPaidClassifiedAsOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-251": {
   "value": "18701000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivitiesContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-252": {
   "value": "29285000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivitiesContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-253": {
   "value": "25883000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivitiesContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-254": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivitiesDiscontinuedOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-255": {
   "value": "2889000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivitiesDiscontinuedOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-256": {
   "value": "1351000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivitiesDiscontinuedOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-257": {
   "value": "18701000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-258": {
   "value": "32174000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-259": {
   "value": "27234000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-260": {
   "value": "6733000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfPropertyPlantAndEquipmentClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-261": {
   "value": "5855000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfPropertyPlantAndEquipmentClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-262": {
   "value": "5612000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfPropertyPlantAndEquipmentClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-263": {
   "value": "350000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfExplorationAndEvaluationAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-264": {
   "value": "256000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfExplorationAndEvaluationAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-265": {
   "value": "192000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfExplorationAndEvaluationAssets",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-266": {
   "value": "294000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInExplorationForAndEvaluationOfMineralResourcesClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-267": {
   "value": "199000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInExplorationForAndEvaluationOfMineralResourcesClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-268": {
   "value": "134000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInExplorationForAndEvaluationOfMineralResourcesClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-269": {
   "value": "5868000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsUsedInObtainingControlOfSubsidiariesOrOtherBusinessesClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-270": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsUsedInObtainingControlOfSubsidiariesOrOtherBusinessesClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-271": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsUsedInObtainingControlOfSubsidiariesOrOtherBusinessesClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-272": {
   "value": "557000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:NetInvestmentAndFundingOfEquityAccountedInvestmentsClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-273": {
   "value": "266000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:NetInvestmentAndFundingOfEquityAccountedInvestmentsClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-274": {
   "value": "553000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:NetInvestmentAndFundingOfEquityAccountedInvestmentsClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-275": {
   "value": "444000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ProceedsFromSaleOfAssetsClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-276": {
   "value": "221000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ProceedsFromSaleOfAssetsClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-277": {
   "value": "158000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ProceedsFromSaleOfAssetsClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-278": {
   "value": "82000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromLosingControlOfSubsidiariesOrOtherBusinessesClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-279": {
   "value": "1255000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromLosingControlOfSubsidiariesOrOtherBusinessesClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-280": {
   "value": "-3000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromLosingControlOfSubsidiariesOrOtherBusinessesClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-281": {
   "value": "-377000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherInflowsOutflowsOfCashClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-282": {
   "value": "-271000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherInflowsOutflowsOfCashClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-283": {
   "value": "-257000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherInflowsOutflowsOfCashClassifiedAsInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-284": {
   "value": "-13065000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivitiesContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-285": {
   "value": "-4973000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivitiesContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-286": {
   "value": "-6325000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivitiesContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-287": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivitiesDiscontinuedOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-288": {
   "value": "-904000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivitiesDiscontinuedOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-289": {
   "value": "-1520000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivitiesDiscontinuedOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-290": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PortionOfConsiderationPaidReceivedConsistingOfCashAndCashEquivalents",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-291": {
   "value": "683000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PortionOfConsiderationPaidReceivedConsistingOfCashAndCashEquivalents",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-292": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PortionOfConsiderationPaidReceivedConsistingOfCashAndCashEquivalents",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-293": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalentsInSubsidiaryOrBusinessesAcquiredOrDisposed2013",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-294": {
   "value": "-399000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalentsInSubsidiaryOrBusinessesAcquiredOrDisposed2013",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-295": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalentsInSubsidiaryOrBusinessesAcquiredOrDisposed2013",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-296": {
   "value": "-13065000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-297": {
   "value": "-6959000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-298": {
   "value": "-7845000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-299": {
   "value": "8182000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-300": {
   "value": "1164000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-301": {
   "value": "568000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-302": {
   "value": "-677000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ProceedsSettlementsOfDebtRelatedInstrumentsClassifiedAsFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-303": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ProceedsSettlementsOfDebtRelatedInstrumentsClassifiedAsFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-304": {
   "value": "167000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ProceedsSettlementsOfDebtRelatedInstrumentsClassifiedAsFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-305": {
   "value": "3289000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:RepaymentsOfBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-306": {
   "value": "3358000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:RepaymentsOfBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-307": {
   "value": "8357000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:RepaymentsOfBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-308": {
   "value": "88000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PaymentsToAcquireOrRedeemEntitysShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-309": {
   "value": "149000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PaymentsToAcquireOrRedeemEntitysShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-310": {
   "value": "234000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PaymentsToAcquireOrRedeemEntitysShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-311": {
   "value": "13268000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaidToEquityHoldersOfParentClassifiedAsFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-312": {
   "value": "17851000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaidToEquityHoldersOfParentClassifiedAsFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-313": {
   "value": "7901000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaidToEquityHoldersOfParentClassifiedAsFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-314": {
   "value": "1175000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaidToNoncontrollingInterestsClassifiedAsFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-315": {
   "value": "2540000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaidToNoncontrollingInterestsClassifiedAsFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-316": {
   "value": "2127000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaidToNoncontrollingInterestsClassifiedAsFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-317": {
   "value": "-10315000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivitiesContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-318": {
   "value": "-22734000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivitiesContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-319": {
   "value": "-17884000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivitiesContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-320": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivitiesDiscontinuedOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-321": {
   "value": "-33000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivitiesDiscontinuedOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-322": {
   "value": "-38000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivitiesDiscontinuedOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-323": {
   "value": "-10315000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-324": {
   "value": "-22767000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-325": {
   "value": "-17922000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivities",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-326": {
   "value": "-4679000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:NetIncreaseDecreaseInCashAndCashEquivalentsFromContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-327": {
   "value": "1578000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:NetIncreaseDecreaseInCashAndCashEquivalentsFromContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-328": {
   "value": "1674000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:NetIncreaseDecreaseInCashAndCashEquivalentsFromContinuingOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-329": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInCashAndCashEquivalentsDiscontinuedOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-330": {
   "value": "1952000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInCashAndCashEquivalentsDiscontinuedOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-331": {
   "value": "-207000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInCashAndCashEquivalentsDiscontinuedOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-332": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PortionOfConsiderationPaidReceivedConsistingOfCashAndCashEquivalents",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-333": {
   "value": "683000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PortionOfConsiderationPaidReceivedConsistingOfCashAndCashEquivalents",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-334": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PortionOfConsiderationPaidReceivedConsistingOfCashAndCashEquivalents",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-335": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalentsInSubsidiaryOrBusinessesAcquiredOrDisposed2013",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-336": {
   "value": "-399000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalentsInSubsidiaryOrBusinessesAcquiredOrDisposed2013",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-337": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalentsInSubsidiaryOrBusinessesAcquiredOrDisposed2013",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-338": {
   "value": "17236000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalentsIfDifferentFromStatementOfFinancialPosition",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-339": {
   "value": "15246000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalentsIfDifferentFromStatementOfFinancialPosition",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-340": {
   "value": "13426000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalentsIfDifferentFromStatementOfFinancialPosition",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-341": {
   "value": "-134000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:EffectOfExchangeRateChangesOnCashAndCashEquivalents",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-342": {
   "value": "-458000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:EffectOfExchangeRateChangesOnCashAndCashEquivalents",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-343": {
   "value": "353000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:EffectOfExchangeRateChangesOnCashAndCashEquivalents",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-344": {
   "value": "12423000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalentsIfDifferentFromStatementOfFinancialPosition",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-345": {
   "value": "17236000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalentsIfDifferentFromStatementOfFinancialPosition",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-346": {
   "value": "15246000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalentsIfDifferentFromStatementOfFinancialPosition",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-347": {
   "value": "4638000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-348": {
   "value": "-31000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-349": {
   "value": "12000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-350": {
   "value": "40338000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-351": {
   "value": "44957000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-352": {
   "value": "3809000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-353": {
   "value": "48766000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-354": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-355": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-356": {
   "value": "4000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-357": {
   "value": "12913000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-358": {
   "value": "12917000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-359": {
   "value": "1400000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-360": {
   "value": "14317000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-361": {
   "value": "99000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-362": {
   "value": "-99000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-363": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-364": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-365": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-366": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-367": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-368": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-369": {
   "value": "88000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-370": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-371": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-372": {
   "value": "88000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-373": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-374": {
   "value": "88000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-375": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-376": {
   "value": "177000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-377": {
   "value": "-132000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-378": {
   "value": "-45000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-379": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-380": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-381": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-382": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-383": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-384": {
   "value": "-1000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-385": {
   "value": "1000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-386": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-387": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-388": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-389": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-390": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-391": {
   "value": "130000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-392": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-393": {
   "value": "130000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-394": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-395": {
   "value": "130000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-396": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-397": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-398": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-399": {
   "value": "13420000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-400": {
   "value": "13420000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-401": {
   "value": "1175000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-402": {
   "value": "14595000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-403": {
   "value": "4737000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-404": {
   "value": "-41000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-405": {
   "value": "13000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-406": {
   "value": "39787000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-407": {
   "value": "44496000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-408": {
   "value": "4034000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-409": {
   "value": "48530000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2023-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-410": {
   "value": "1111000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-411": {
   "value": "1057000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-412": {
   "value": "-32000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-413": {
   "value": "-1000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-414": {
   "value": "2350000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-415": {
   "value": "46779000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-416": {
   "value": "51264000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-417": {
   "value": "4341000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-418": {
   "value": "55605000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-419": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-420": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-421": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-422": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-423": {
   "value": "-90000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-424": {
   "value": "30910000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-425": {
   "value": "30820000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-426": {
   "value": "2160000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-427": {
   "value": "32980000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-428": {
   "value": "172000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-429": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-430": {
   "value": "-172000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-431": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-432": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-433": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-434": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-435": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-436": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-437": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-438": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-439": {
   "value": "148000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-440": {
   "value": "1000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-441": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-442": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-443": {
   "value": "149000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-444": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-445": {
   "value": "149000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-446": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-447": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-448": {
   "value": "321000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-449": {
   "value": "2000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-450": {
   "value": "-207000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-451": {
   "value": "-116000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-452": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-453": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-454": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-455": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-456": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-457": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-458": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-459": {
   "value": "-30000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-460": {
   "value": "30000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-461": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-462": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-463": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-464": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-465": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-466": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-467": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-468": {
   "value": "143000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-469": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-470": {
   "value": "143000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-471": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-472": {
   "value": "143000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-473": {
   "value": "3355000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:CorporateStructureUnification",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-474": {
   "value": "-1057000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:CorporateStructureUnification",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-475": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:CorporateStructureUnification",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-476": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:CorporateStructureUnification",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-477": {
   "value": "-2298000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:CorporateStructureUnification",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-478": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:CorporateStructureUnification",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-479": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:CorporateStructureUnification",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-480": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:CorporateStructureUnification",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-481": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:CorporateStructureUnification",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-482": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-483": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-484": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-485": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-486": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-487": {
   "value": "17720000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-488": {
   "value": "17720000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-489": {
   "value": "2540000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-490": {
   "value": "20260000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-491": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:InSpecieDividend",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-492": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:InSpecieDividend",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-493": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:InSpecieDividend",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-494": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:InSpecieDividend",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-495": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:InSpecieDividend",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-496": {
   "value": "19559000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:InSpecieDividend",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-497": {
   "value": "19559000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:InSpecieDividend",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-498": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:InSpecieDividend",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-499": {
   "value": "19559000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:InSpecieDividend",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-500": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseInEquityThroughDisposalOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-501": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseInEquityThroughDisposalOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-502": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseInEquityThroughDisposalOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-503": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseInEquityThroughDisposalOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-504": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseInEquityThroughDisposalOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-505": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseInEquityThroughDisposalOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-506": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseInEquityThroughDisposalOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-507": {
   "value": "-157000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseInEquityThroughDisposalOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-508": {
   "value": "-157000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseInEquityThroughDisposalOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-509": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:TransfersWithinEquityOnDivestmentOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-510": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:TransfersWithinEquityOnDivestmentOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-511": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:TransfersWithinEquityOnDivestmentOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-512": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:TransfersWithinEquityOnDivestmentOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-513": {
   "value": "-14000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:TransfersWithinEquityOnDivestmentOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-514": {
   "value": "14000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:TransfersWithinEquityOnDivestmentOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-515": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:TransfersWithinEquityOnDivestmentOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-516": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:TransfersWithinEquityOnDivestmentOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-517": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:TransfersWithinEquityOnDivestmentOfSubsidiariesOperationsAndJointOperations",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-518": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughOtherContributionsByOwners",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-519": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughOtherContributionsByOwners",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-520": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughOtherContributionsByOwners",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-521": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughOtherContributionsByOwners",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-522": {
   "value": "158000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughOtherContributionsByOwners",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-523": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughOtherContributionsByOwners",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-524": {
   "value": "158000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughOtherContributionsByOwners",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-525": {
   "value": "5000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughOtherContributionsByOwners",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-526": {
   "value": "163000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughOtherContributionsByOwners",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00/2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-527": {
   "value": "4638000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-528": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-529": {
   "value": "-31000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-530": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-531": {
   "value": "12000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-532": {
   "value": "40338000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-533": {
   "value": "44957000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-534": {
   "value": "3809000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-535": {
   "value": "48766000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-536": {
   "value": "1111000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-537": {
   "value": "1057000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-538": {
   "value": "-5000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-539": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-540": {
   "value": "2306000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-541": {
   "value": "43396000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-542": {
   "value": "47865000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-543": {
   "value": "4310000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-544": {
   "value": "52175000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-545": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-546": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-547": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-548": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-549": {
   "value": "22000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-550": {
   "value": "11330000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-551": {
   "value": "11352000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-552": {
   "value": "2158000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-553": {
   "value": "13510000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-554": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-555": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-556": {
   "value": "229000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-557": {
   "value": "5000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-558": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-559": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-560": {
   "value": "234000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-561": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-562": {
   "value": "234000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-563": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-564": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-565": {
   "value": "202000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-566": {
   "value": "4000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-567": {
   "value": "-149000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-568": {
   "value": "-57000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-569": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-570": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-571": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughExerciseOfOptions",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-572": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-573": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-574": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-575": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-576": {
   "value": "-4000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-577": {
   "value": "4000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-578": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-579": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-580": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:ChangeInEquityThroughEmployeeShareAwardsForfeited",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-581": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-582": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-583": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-584": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-585": {
   "value": "175000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-586": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-587": {
   "value": "175000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-588": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-589": {
   "value": "175000000",
   "decimals": -6,
   "dimensions": {
    "concept": "bhp:IncreaseDecreaseThroughAccruedEmployeeEntitlementForUnexercisedAwards",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-590": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-591": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-592": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-593": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-594": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-595": {
   "value": "7894000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-596": {
   "value": "7894000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-597": {
   "value": "2127000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-598": {
   "value": "10021000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2020-07-01T00:00:00/2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-599": {
   "value": "1111000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-600": {
   "value": "1057000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:ShareCapitalBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-601": {
   "value": "-32000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupLimitedMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-602": {
   "value": "-1000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "bhp:TreasurySharesBHPGroupPlcMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-603": {
   "value": "2350000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-604": {
   "value": "46779000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-605": {
   "value": "51264000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-606": {
   "value": "4341000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-607": {
   "value": "55605000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2021-07-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-655": {
   "value": "Basis of preparation The Consolidated Financial Statements (Financial Statements) comprise BHP Group Limited (BHP or the Company) together with its controlled entities (Group) for the year ended 30 June 2023. BHP Group Limited, incorporated and domiciled in Australia, is a for-profit company limited by shares which are publicly traded on the Australian Securities Exchange. BHP Group Limited also has a standard listing on the London Stock Exchange (LSE), a secondary listing on the Johannesburg Stock Exchange and is listed on the New York Stock Exchange (NYSE) in the United States. Prior to 31 January 2022, BHP Group Limited and BHP Group Plc, an incorporated UK-listed company, operated together as a single-for-profit economic entity under a Dual Listed Company (DLC) structure comprising a common Board of Directors, unified management structure and joint objectives. On 31 January 2022, BHP unified its corporate structure under BHP Group Limited. Directors of BHP have included information in the Financial Statements they deem to be material and relevant to the understanding of the Financial Statements. Disclosure may be considered material and relevant if the dollar amount is significant due to its size or nature, or the information is important to understand the: \u2013  Group\u2019s current year results \u2013  impact of significant changes in the Group\u2019s business or \u2013  aspects of the Group\u2019s operations that are important to future performance The Board of Directors resolved to authorise the issue of the financial report on 22 August 2023. Basis of preparation and measurement The Group\u2019s Financial Statements as at and for the year ended 30 June 2023: \u2013  are a consolidated general purpose financial report \u2013  have been prepared in accordance with the requirements of: \u2013  the Australian Corporations Act 2001 (Corporations Act 2001) \u2013  Australian Accounting Standards and other authoritative pronouncements of the Australian Accounting Standards Board (AASB) and International Financial Reporting Standards as issued by the International Accounting Standards Board (IASB) (collectively referred to as IFRS) \u2013   are prepared on a going concern basis as the Directors: \u2013  have made an assessment of the Group\u2019s ability to continue as a going concern for the 12 months from the date of this report \u2013  consider it appropriate to adopt the going concern basis of accounting in preparing the Group\u2019s Financial Statements \u2013  measure items on the basis of historical cost principles, except for the following items: \u2013  derivative financial instruments and certain other financial assets and liabilities, which are carried at fair value \u2013  non-current assets or disposal groups that are classified as held- for-sale or held-for-distribution, which are measured at the lower of carrying amount and fair value less costs to sell \u2013  include significant accounting policies in the notes to the Financial Statements that summarise the recognition and measurement basis used and are relevant to an understanding of the Financial Statements \u2013  apply a presentation currency of US dollars, consistent with the predominant functional currency of the Group\u2019s operations. Amounts are rounded to the nearest million dollars, unless otherwise stated, in accordance with ASIC (Rounding in Financial/Directors\u2019 Reports) Instrument 2016/191 \u2013  present reclassified comparative information where required for consistency with the current year\u2019s presentation \u2013  adopt all new and amended standards and interpretations under IFRS that are mandatory for application in periods beginning on 1 July 2022. None had a significant impact on the Financial Statements. Refer note 39 \u2018New and amended accounting standards and interpretations and changes to accounting policies\u2019 for details \u2013  have not early adopted any standards and interpretations that have been issued or amended but are not yet effective, other than as outlined in note 39 \u2018New and amended accounting standards and interpretations and changes to accounting policies\u2019 The accounting policies are consistently applied by all entities included in the Financial Statements. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGeneralInformationAboutFinancialStatementsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-614": {
   "value": "Basis of preparation The Consolidated Financial Statements (Financial Statements) comprise BHP Group Limited (BHP or the Company) together with its controlled entities (Group) for the year ended 30 June 2023. BHP Group Limited, incorporated and domiciled in Australia, is a for-profit company limited by shares which are publicly traded on the Australian Securities Exchange. BHP Group Limited also has a standard listing on the London Stock Exchange (LSE), a secondary listing on the Johannesburg Stock Exchange and is listed on the New York Stock Exchange (NYSE) in the United States. Prior to 31 January 2022, BHP Group Limited and BHP Group Plc, an incorporated UK-listed company, operated together as a single-for-profit economic entity under a Dual Listed Company (DLC) structure comprising a common Board of Directors, unified management structure and joint objectives. On 31 January 2022, BHP unified its corporate structure under BHP Group Limited. Directors of BHP have included information in the Financial Statements they deem to be material and relevant to the understanding of the Financial Statements. Disclosure may be considered material and relevant if the dollar amount is significant due to its size or nature, or the information is important to understand the: \u2013  Group\u2019s current year results \u2013  impact of significant changes in the Group\u2019s business or \u2013  aspects of the Group\u2019s operations that are important to future performance The Board of Directors resolved to authorise the issue of the financial report on 22 August 2023. Basis of preparation and measurement The Group\u2019s Financial Statements as at and for the year ended 30 June 2023: \u2013  are a consolidated general purpose financial report \u2013  have been prepared in accordance with the requirements of: \u2013  the Australian Corporations Act 2001 (Corporations Act 2001) \u2013  Australian Accounting Standards and other authoritative pronouncements of the Australian Accounting Standards Board (AASB) and International Financial Reporting Standards as issued by the International Accounting Standards Board (IASB) (collectively referred to as IFRS) \u2013   are prepared on a going concern basis as the Directors: \u2013  have made an assessment of the Group\u2019s ability to continue as a going concern for the 12 months from the date of this report \u2013  consider it appropriate to adopt the going concern basis of accounting in preparing the Group\u2019s Financial Statements \u2013  measure items on the basis of historical cost principles, except for the following items: \u2013  derivative financial instruments and certain other financial assets and liabilities, which are carried at fair value \u2013  non-current assets or disposal groups that are classified as held- for-sale or held-for-distribution, which are measured at the lower of carrying amount and fair value less costs to sell \u2013  include significant accounting policies in the notes to the Financial Statements that summarise the recognition and measurement basis used and are relevant to an understanding of the Financial Statements \u2013  apply a presentation currency of US dollars, consistent with the predominant functional currency of the Group\u2019s operations. Amounts are rounded to the nearest million dollars, unless otherwise stated, in accordance with ASIC (Rounding in Financial/Directors\u2019 Reports) Instrument 2016/191 \u2013  present reclassified comparative information where required for consistency with the current year\u2019s presentation \u2013  adopt all new and amended standards and interpretations under IFRS that are mandatory for application in periods beginning on 1 July 2022. None had a significant impact on the Financial Statements. Refer note 39 \u2018New and amended accounting standards and interpretations and changes to accounting policies\u2019 for details \u2013  have not early adopted any standards and interpretations that have been issued or amended but are not yet effective, other than as outlined in note 39 \u2018New and amended accounting standards and interpretations and changes to accounting policies\u2019 The accounting policies are consistently applied by all entities included in the Financial Statements. In assessing the appropriateness of the going concern assumption over the going concern period, management has stress tested BHP\u2019s most recent financial projections to incorporate a range of potential future outcomes by considering BHP\u2019s principal risks. The Group\u2019s financial forecasts, including downside commodity price and production scenarios, demonstrate that the Group believes that it has sufficient financial resources to meet its obligations as they fall due throughout the going concern period. As such, the Financial Statements continue to be prepared on the going concern basis. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBasisOfPreparationOfFinancialStatementsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-612": {
   "value": "Basis of preparation The Consolidated Financial Statements (Financial Statements) comprise BHP Group Limited (BHP or the Company) together with its controlled entities (Group) for the year ended 30 June 2023. BHP Group Limited, incorporated and domiciled in Australia, is a for-profit company limited by shares which are publicly traded on the Australian Securities Exchange. BHP Group Limited also has a standard listing on the London Stock Exchange (LSE), a secondary listing on the Johannesburg Stock Exchange and is listed on the New York Stock Exchange (NYSE) in the United States. Prior to 31 January 2022, BHP Group Limited and BHP Group Plc, an incorporated UK-listed company, operated together as a single-for-profit economic entity under a Dual Listed Company (DLC) structure comprising a common Board of Directors, unified management structure and joint objectives. On 31 January 2022, BHP unified its corporate structure under BHP Group Limited. Directors of BHP have included information in the Financial Statements they deem to be material and relevant to the understanding of the Financial Statements. Disclosure may be considered material and relevant if the dollar amount is significant due to its size or nature, or the information is important to understand the: \u2013  Group\u2019s current year results \u2013  impact of significant changes in the Group\u2019s business or \u2013  aspects of the Group\u2019s operations that are important to future performance The Board of Directors resolved to authorise the issue of the financial report on 22 August 2023. Basis of preparation and measurement The Group\u2019s Financial Statements as at and for the year ended 30 June 2023: \u2013  are a consolidated general purpose financial report \u2013  have been prepared in accordance with the requirements of: \u2013  the Australian Corporations Act 2001 (Corporations Act 2001) \u2013  Australian Accounting Standards and other authoritative pronouncements of the Australian Accounting Standards Board (AASB) and International Financial Reporting Standards as issued by the International Accounting Standards Board (IASB) (collectively referred to as IFRS) \u2013   are prepared on a going concern basis as the Directors: \u2013  have made an assessment of the Group\u2019s ability to continue as a going concern for the 12 months from the date of this report \u2013  consider it appropriate to adopt the going concern basis of accounting in preparing the Group\u2019s Financial Statements \u2013  measure items on the basis of historical cost principles, except for the following items: \u2013  derivative financial instruments and certain other financial assets and liabilities, which are carried at fair value \u2013  non-current assets or disposal groups that are classified as held- for-sale or held-for-distribution, which are measured at the lower of carrying amount and fair value less costs to sell \u2013  include significant accounting policies in the notes to the Financial Statements that summarise the recognition and measurement basis used and are relevant to an understanding of the Financial Statements \u2013  apply a presentation currency of US dollars, consistent with the predominant functional currency of the Group\u2019s operations. Amounts are rounded to the nearest million dollars, unless otherwise stated, in accordance with ASIC (Rounding in Financial/Directors\u2019 Reports) Instrument 2016/191 \u2013  present reclassified comparative information where required for consistency with the current year\u2019s presentation \u2013  adopt all new and amended standards and interpretations under IFRS that are mandatory for application in periods beginning on 1 July 2022. None had a significant impact on the Financial Statements. Refer note 39 \u2018New and amended accounting standards and interpretations and changes to accounting policies\u2019 for details \u2013  have not early adopted any standards and interpretations that have been issued or amended but are not yet effective, other than as outlined in note 39 \u2018New and amended accounting standards and interpretations and changes to accounting policies\u2019 The accounting policies are consistently applied by all entities included in the Financial Statements. In assessing the appropriateness of the going concern assumption over the going concern period, management has stress tested BHP\u2019s most recent financial projections to incorporate a range of potential future outcomes by considering BHP\u2019s principal risks. The Group\u2019s financial forecasts, including downside commodity price and production scenarios, demonstrate that the Group believes that it has sufficient financial resources to meet its obligations as they fall due throughout the going concern period. As such, the Financial Statements continue to be prepared on the going concern basis. Principles of consolidation In preparing the Financial Statements, the effects of all intragroup balances and transactions have been eliminated. A list of significant entities in the Group, including subsidiaries, joint arrangements and associates at 30 June 2023 is contained in note 30 \u2018Subsidiaries\u2019, note 31 \u2018Investments accounted for using the equity method\u2019 and note 32 \u2018Interests in joint operations\u2019. Subsidiaries: The Financial Statements of the Group include the consolidation of BHP Group Limited (the Company or parent entity) and its subsidiaries, being the entities controlled by the parent entity during the year (and, in prior periods, BHP Group Plc and its subsidiaries while the DLC was in effect). Control exists where the Group: \u2013  has power over the investee \u2013  is exposed to, or has rights to, variable returns from its involvement with the entity \u2013  has the ability to affect those returns through its power to direct the activities of the entity The ability to approve the operating and capital budget of an entity and the ability to appoint key management personnel are decisions that demonstrate that the Group has the existing rights to direct the relevant activities of an entity. The results of subsidiaries acquired or disposed of during the year are included in profit or loss from the date the Company gains control until the date when the Company ceases to control the subsidiary. When the Group loses control of a subsidiary, the gain or loss on disposal is recognised in profit or loss. Where the Group\u2019s interest is less than 100 per cent, the interest attributable to outside shareholders is reflected in non-controlling interests. Changes in the Group\u2019s interests in subsidiaries that do not result in a loss of control are accounted for as equity transactions. The carrying amount of the Group\u2019s interests and the non-controlling interests are adjusted to reflect the changes in their relative interests in the subsidiaries. Any difference between the amount by which the non-controlling interests are adjusted and the fair value of the consideration paid or received is recognised directly in equity and attributed to the owners of the Company. The financial information of subsidiaries is prepared for the same reporting period as the Group. The acquisition method of accounting is used to account for the Group\u2019s business combinations. Joint arrangements: The Group undertakes a number of business activities through joint arrangements, which exist when two or more parties have joint control. Joint arrangements are classified as either joint operations or joint ventures, based on the contractual rights and obligations between the parties to the arrangement: \u2013  Joint operations: A joint operation is an arrangement in which the Group shares joint control, primarily via contractual arrangements with other parties. In a joint operation, the Group has rights to the underlying assets and obligations for the liabilities relating to the arrangement. This includes situations where the parties benefit from the joint activity through a share of the output, rather than by receiving a share of the results of trading. In relation to the Group\u2019s interest in a joint operation, the Group recognises: its assets and liabilities, including its share of any assets and liabilities held or incurred jointly; revenue from the sale of its share of the output and its share of any revenue generated from the sale of the output by the joint operation; and its expenses including its share of expenses incurred jointly. All such amounts are allocated in accordance with the terms of the arrangement, which is usually in proportion to the Group\u2019s interest in the joint operation. The Group accounts for the assets, liabilities, revenue and expenses relating to its interest in a joint operation in accordance with the IFRS Standards applicable to the particular assets, liabilities, revenue and expenses. \u2013  Joint ventures: A joint venture is a joint arrangement in which the parties that share joint control have rights to the net assets of the arrangement. A separate vehicle, not the parties, will have the rights to the assets and obligations for the liabilities relating to the arrangement. More than an insignificant share of output from a joint venture is sold to third parties, which indicates the joint venture is not dependent on the parties to the arrangement for funding, nor do the parties have an obligation for the liabilities of the arrangement. Joint ventures are accounted for using the equity method as outlined below. Associates: The Group accounts for investments in associates using the equity method as outlined below. An entity is considered an associate where the Group is deemed to have significant influence but not control or joint control. Significant influence is presumed to exist where the Group: \u2013  has over 20 per cent but less than 50 per cent of the voting rights of an entity, unless it can be clearly demonstrated that this is not the case or \u2013  holds less than 20 per cent of the voting rights of an entity; however, has the power to participate in the financial and operating policy decisions affecting the entity The Group uses the term \u2018equity accounted investments\u2019 to refer to joint ventures and associates collectively. Under the equity method, an investment in an associate or a joint venture is recognised initially at cost and adjusted thereafter to recognise the Group\u2019s share of the profit or loss and other comprehensive income of the associate or joint venture. When the Group\u2019s share of losses of an associate or a joint venture exceeds the Group\u2019s interest in that associate or joint venture, the Group discontinues recognising its share of further losses. Additional losses are recognised only to the extent that the Group has incurred legal or constructive obligations or made payments on behalf of the associate or joint venture. Foreign currencies Transactions related to the Group\u2019s worldwide operations are conducted in a number of foreign currencies. The majority of the subsidiaries, joint arrangements and associates within each of the operations have assessed US dollars as the functional currency, however, some subsidiaries, joint arrangements and associates have functional currencies other than US dollars. Transactions and monetary items denominated in foreign currencies are translated into US dollars as follows: Foreign currency item Applicable exchange rate Transactions Date of underlying transaction Monetary assets and liabilities Period-end rate Foreign exchange gains and losses resulting from translation are recognised in the income statement, except for qualifying cash flow hedges (which are deferred to equity) and foreign exchange gains or losses on foreign currency provisions for site closure and rehabilitation costs (which are capitalised in property, plant and equipment for operating sites). On consolidation, the assets, liabilities, income and expenses of foreign operations with non-US dollar functional currencies are translated into US dollars using the following applicable exchange rates: Foreign currency amount Applicable exchange rate Income and expenses Date of underlying transaction Assets and liabilities Period-end rate Equity Historical rate Reserves Historical rate Foreign exchange differences resulting from translation are initially recognised in the foreign currency translation reserve and subsequently transferred to the income statement on disposal of a foreign operation. Significant accounting policies, judgements and estimates The Group\u2019s accounting policies require the use of judgement, estimates and assumptions. All judgements, estimates and assumptions are based on the most current facts and circumstances and are reassessed on an ongoing basis. Actual results in future reporting periods may differ for these estimates under different assumptions and conditions. Further information regarding the Group\u2019s significant judgements and key estimates and assumptions, being those where changes may materially affect financial results and the carrying amount of assets and liabilities to be reported in the next reporting period, are embedded within the following notes: Note 4  Significant events \u2013 Samarco dam failure 6  Taxation 11 Overburden removal costs 11 Depreciation of property, plant and equipment 13 Impairment of non-current assets 15 Closure and rehabilitation provisions 22 Leases 29  Business combinations Additional information including sensitivity analysis, where appropriate, has been provided in the relevant notes to enhance an understanding of the impact of key estimates and assumptions on the Group\u2019s financial position and performance. Reserve estimates Reserves are estimates of the amount of product that can be demonstrated to be able to be economically and legally extracted from the Group\u2019s properties. In order to estimate reserves, assumptions are required about a range of technical and economic factors, including quantities, qualities, production techniques, recovery efficiency, production and transport costs, commodity supply and demand, commodity and carbon prices and exchange rates. Estimating the quantity and/or quality of reserves requires the size, shape and depth of ore bodies to be determined by analysing geological data, such as drilling samples and geophysical survey interpretations. Economic assumptions used to estimate reserves change from period- to-period as additional technical and operational data is generated. This process may require complex and difficult geological judgements to interpret the data. Reserve impact on financial reporting Estimates of reserves may change from period-to-period as the economic assumptions used to estimate reserves change and additional geological data is generated during the course of operations. Changes in reserves may affect the Group\u2019s financial results and financial position in a number of ways, including: \u2013  asset carrying values may be affected due to changes in estimated future production levels \u2013  depreciation, depletion and amortisation charged to the income statement may change where such charges are determined on the units of production basis, or where the useful economic lives of assets change \u2013  overburden removal costs recorded on the balance sheet or charged to the income statement may change due to changes in stripping ratios or the units of production basis of depreciation \u2013  closure and rehabilitation provisions may change where changes in estimated reserves affect expectations about the timing or cost of these activities \u2013  the carrying amount of deferred tax assets may change due to changes in estimates of the likely recovery of the tax benefits Underlying EBITDA Underlying EBITDA is earnings before net finance costs, depreciation, amortisation and impairments, taxation expense, Discontinued operations and any exceptional items. Underlying EBITDA includes BHP\u2019s share of profit/(loss) from investments accounted for using the equity method including net finance costs, depreciation, amortisation and impairments and taxation expense/(benefit). Exceptional items are excluded from Underlying EBITDA in order to enhance the comparability of such measures from period-to-period and provide investors with further clarity in order to assess the performance of the Group\u2019s operations. Management monitors exceptional items separately. Refer to note 3 \u2018Exceptional items\u2019 for additional detail. Segment assets and liabilities Total segment assets and liabilities of reportable segments represents operating assets and operating liabilities, including the carrying amount of equity accounted investments and predominantly excludes cash balances, loans to associates, interest bearing liabilities and deferred tax balances. The carrying value of investments accounted for using the equity method represents the balance of the Group\u2019s investment in equity accounted investments, with no adjustment for any cash balances, interest bearing liabilities or deferred tax balances of the equity accounted investment. Recognition and measurement The Group generates revenue from the production and sale of commodities. Revenue is recognised when or as control of the promised goods or services passes to the customer. In most instances, control passes when the goods are delivered to a destination specified by the customer, typically on board the customer\u2019s appointed vessel. Revenue from the provision of services is recognised over time as the services are provided, but does not represent a significant proportion of total revenue and is aggregated with the respective asset and product revenue for disclosure purposes. The amount of revenue recognised reflects the consideration to which the Group expects to be entitled in exchange for transferring goods or services. Where the Group\u2019s sales are provisionally priced, the final price depends on future index prices. The amount of revenue initially recognised is based on the relevant forward market price. Adjustments between the provisional and final price are accounted for under IFRS 9/AASB 9 \u2018Financial Instruments\u2019 (IFRS 9), separately recorded as other revenue and presented as part of the total revenue of each asset. The period between provisional pricing and final invoicing is typically between 60 and 120 days. Revenue from the sale of significant by-products is included within revenue. Where a by-product is not significant, revenue is credited against costs. The Group applies the following practical expedients: \u2013  expected consideration is not adjusted for the effects of the time value of money if the period between the delivery and when the customer pays for the promised good or service is one year or less \u2013  no disclosure is provided for information relating to unfulfilled performance obligations, either due to the expected duration of the contract term being one year or less, or for longer term contracts, because the entity has a right to consideration (and can recognise revenue) for goods delivered Exceptional items are those gains or losses where their nature, including the expected frequency of the events giving rise to them, and impact is considered material to the Financial Statements. Such items included within the Group\u2019s profit from Continuing operations for the year are detailed below. Exceptional items attributable to Discontinued operations are detailed in note 28 \u2018Discontinued operations\u2019. Recognition and measurement Other income is recognised when it is probable that the economic benefits associated with a transaction will flow to the Group and can be reliably measured. Dividend income is recognised upon declaration. Recognition and measurement Taxation on the profit/(loss) for the year comprises current and deferred tax. Taxation is recognised in the income statement except to the extent that it relates to items recognised directly in equity or other comprehensive income, in which case the tax effect is also recognised in equity or other comprehensive income. Current tax Deferred tax Royalty-related taxation Current tax is the expected tax on the taxable income for the year, using tax rates and laws enacted or substantively enacted at the reporting date, and any adjustments to tax payable in respect of previous years. Deferred tax is the tax expected to be payable or recoverable on differences between the carrying amounts of assets and liabilities in the financial statements and the corresponding tax bases used in the computation of taxable profit, and is accounted for in accordance with IAS 12/AASB 112 \u2018Income Taxes\u2019 (IAS 12). Deferred tax is generally provided on temporary differences arising between the tax bases of assets and liabilities and their carrying amounts in the Financial Statements. Deferred tax assets are recognised to the extent that it is probable that future taxable profits will be available against which the temporary differences can be utilised. Deferred tax is not recognised for temporary differences relating to: \u2013  initial recognition of goodwill \u2013  initial recognition of assets or liabilities in a transaction that is not a business combination and that affects neither accounting nor taxable profit, except where the transaction gives rise to equal and offsetting taxable and deductible temporary differences \u2013  investment in subsidiaries, associates and jointly controlled entities where the Group is able to control the timing of the reversal of the temporary difference and it is probable that they will not reverse in the foreseeable future Deferred tax is measured at the tax rates that are expected to be applied when the asset is realised or the liability is settled, based on the laws that have been enacted or substantively enacted at the reporting date. Current and deferred tax assets and liabilities are offset when the Group has a legally enforceable right to offset and when the tax balances are related to taxes levied by the same tax authority and the Group intends to settle on a net basis, or realise the asset and settle the liability simultaneously. The carrying amount of deferred tax assets is reviewed at each reporting date and reduced to the extent that it is no longer probable that sufficient taxable profits will be available to allow all or part of the asset to be recovered. Royalties are treated as taxation arrangements (impacting income tax expense/(benefit)) when they are imposed under government authority and the amount payable is calculated by reference to revenue derived (net of any allowable deductions) after adjustment for temporary differences. Obligations arising from royalty arrangements that do not satisfy these criteria are recognised as current liabilities and included in expenses. International Tax Reform \u2013 Pillar Two Model Rules The Organisation for Economic Co-operation and Development (OECD)/G20 Inclusive Framework on Base Erosion and Profit Shifting published the Pillar Two model rules designed to address the tax challenges arising from the digitalisation of the global economy. It is unclear if the Pillar Two model rules create additional temporary differences, whether to remeasure deferred taxes for the Pillar Two model rules and which tax rate to use to measure deferred taxes. In response to this uncertainty, on 23 May 2023 and 27 June 2023, respectively, the IASB and AASB issued amendments to IAS 12 \u2018Income taxes\u2019 introducing a mandatory temporary exception to the requirements of IAS 12 under which a company does not recognise or disclose information about deferred tax assets and liabilities related to the proposed OECD/G20 BEPS Pillar Two model rules. The Group applied the temporary exception at 30 June 2023. Uncertain tax and royalty matters The Group operates across many tax jurisdictions. Application of tax law can be complex and requires judgement to assess risk and estimate outcomes. These judgements are subject to risk and uncertainty, hence there is a possibility that changes in circumstances will alter expectations, which may impact the amount of tax assets and tax liabilities, including deferred tax, recognised on the balance sheet and the amount of other tax losses and temporary differences not yet recognised. The evaluation of tax risks considers both amended assessments received and potential sources of challenge from tax authorities. The status of proceedings for these matters will impact the ability to determine the potential exposure and in some cases, it may not be possible to determine a range of possible outcomes or a reliable estimate of the potential exposure. Tax and royalty matters with uncertain outcomes arise in the normal course of business and occur due to changes in tax law, changes in interpretation of tax law, periodic challenges and disagreements with tax authorities and legal proceedings. Tax and royalty obligations assessed as having probable future economic outflows capable of reliable measurement are provided for as at 30 June 2023. Matters with a possible economic outflow and/or presently incapable of being measured reliably are contingent liabilities and disclosed in note 34 \u2018Contingent liabilities\u2019. Details of uncertain tax and royalty matters relating to Samarco are disclosed in note 4 \u2018Significant events \u2013 Samarco dam failure\u2019. Recognition and measurement Diluted earnings attributable to BHP shareholders are equal to the earnings attributable to BHP shareholders. Prior to the Group\u2019s corporate structure unification, the calculation of the number of ordinary shares used in the computation of basic earnings per share was the aggregate of the weighted average number of ordinary shares of BHP Group Limited and BHP Group Plc outstanding during the period after deduction of the number of shares held by the Billiton Employee Share Ownership Trust and the BHP Group Limited Employee Equity Trust (previously known as \u2018BHP Billiton Limited Employee Equity Trust\u2019). Effective from 31 January 2022, the aggregate of the weighted average number of ordinary shares of only BHP Group Limited is considered in the computation of basic earnings per share. Refer to note 17 \u2018Share capital\u2019 for details on unification. For the purposes of calculating diluted earnings per share, the effect of 9 million dilutive shares has been taken into account for the year ended 30 June 2023 (2022: 10 million shares; 2021: 11 million shares). The Group\u2019s only potential dilutive ordinary shares are share awards granted under the employee share ownership plans for which terms and conditions are described in note 26 \u2018Employee share ownership plans\u2019. Diluted earnings per share calculation excludes instruments which are considered antidilutive. At 30 June 2023, there are no instruments which are considered antidilutive (2022: nil; 2021: nil). Recognition and measurement Trade receivables are recognised initially at their transaction price or, for those receivables containing a significant financing component, at fair value. Trade receivables are subsequently measured at amortised cost using the effective interest method, less an allowance for impairment, except for provisionally priced receivables which are subsequently measured at fair value through profit or loss under IFRS 9. The collectability of trade and other receivables is assessed continuously. At the reporting date, specific allowances are made for any expected credit losses based on a review of all outstanding amounts at reporting period-end. Individual receivables are written off when management deems them unrecoverable. The net carrying amount of trade and other receivables approximates their fair values. Recognition and measurement Regardless of the type of inventory and its stage in the production process, inventories are valued at the lower of cost and net realisable value. Cost is determined primarily on the basis of average costs and involves estimates of expected metal recoveries and work in progress volumes, calculated using available industry, engineering and scientific data. These estimates are periodically reassessed by the Group taking into account technical analysis and historical performance. For processed inventories, cost is derived on an absorption costing basis. Cost comprises costs of purchasing raw materials and costs of production, including attributable mining and manufacturing overheads taking into consideration normal operating capacity. Inventory quantities are assessed primarily through surveys and assays. Recognition and measurement Property, plant and equipment Property, plant and equipment is recorded at cost less accumulated depreciation and impairment charges. Cost is the fair value of consideration given to acquire the asset at the time of its acquisition or construction and includes the direct costs of bringing the asset to the location and the condition necessary for operation and the estimated future costs of closure and rehabilitation of the facility. Right-of-use assets are measured at cost, less any accumulated depreciation and impairment losses, and adjusted for any remeasurement of lease liabilities. Refer to note 22 \u2018Leases\u2019 for further details. Right-of-use assets are presented within the category of property, plant and equipment according to the nature of the underlying asset leased. Exploration and evaluation Exploration costs are incurred to discover mineral resources. Evaluation costs are incurred to assess the technical feasibility and commercial viability of resources found. Exploration and evaluation expenditure is charged to the income statement as incurred, except in the following circumstances in which case the expenditure may be capitalised: \u2013  the exploration and evaluation activity is within an area of interest that was previously acquired as an asset acquisition or in a business combination and measured at fair value on acquisition or \u2013  the existence of a commercially viable mineral deposit has been established A regular review of each area of interest is undertaken to determine the appropriateness of continuing to carry forward costs in relation to that area. Capitalised costs are only carried forward to the extent that they are expected to be recovered through the successful exploitation of the area of interest or alternatively by its sale. To the extent that capitalised expenditure is no longer expected to be recovered, it is charged to the income statement. Development expenditure When proven mineral reserves are determined and development is sanctioned, capitalised exploration and evaluation expenditure is reclassified as assets under construction within property, plant and equipment. All subsequent development expenditure is capitalised and classified as assets under construction, provided commercial viability conditions continue to be satisfied. The Group may use funds sourced from external parties to finance the acquisition and development of assets and operations. Finance costs are expensed as incurred, except where they relate to the financing of construction or development of qualifying assets. Borrowing costs directly attributable to acquiring or constructing a qualifying asset are capitalised during the development phase. In the instance where saleable material is extracted prior to the commissioning of a project/site, sale proceeds are recognised as revenue, with associated costs also recognised in the income statement. On completion of development, all assets included in assets under construction are reclassified as either plant and equipment or other mineral assets and depreciation commences. Other mineral assets Other mineral assets comprise: \u2013  capitalised exploration, evaluation and development expenditure for assets in production \u2013  mineral rights acquired \u2013  capitalised development and production stripping costs Overburden removal costs The process of removing overburden and other waste materials to access mineral deposits is referred to as stripping. Stripping is necessary to obtain access to mineral deposits and occurs throughout the life of an open-pit mine. Development and production stripping costs are classified as other mineral assets in property, plant and equipment. Stripping costs are accounted for separately for individual components of an ore body. The determination of components is dependent on the mine plan and other factors, including the size, shape and geotechnical aspects of an ore body. The Group accounts for stripping activities as follows: Development stripping costs These are initial overburden removal costs incurred to obtain access to mineral deposits that will be commercially produced. These costs are capitalised when it is probable that future economic benefits (access to mineral ores) will flow to the Group and costs can be measured reliably. Once the production phase begins, capitalised development stripping costs are depreciated using the units of production method based on the proven and probable reserves of the relevant identified component of the ore body which the initial stripping activity benefits. Production stripping costs These are post initial overburden removal costs incurred during the normal course of production activity, which commences after the first saleable minerals have been extracted from the component. Production stripping costs can give rise to two benefits, the accounting for which is outlined below: Production stripping activity Benefits of stripping activity Extraction of ore (inventory) in current period. Improved access to future ore extraction. Period benefited Current period Future period(s) Recognition and measurement criteria When the benefits of stripping activities are realised in the form of inventory produced; the associated costs are recorded in accordance with the Group\u2019s inventory accounting policy. When the benefits of stripping activities are improved access to future ore; production costs are capitalised when all the following criteria are met: \u2013  the production stripping activity improves access to a specific component of the ore body and it is probable that economic benefits arising from the improved access to future ore production will be realised \u2013  the component of the ore body for which access has been improved can be identified \u2013  costs associated with that component can be measured reliably Allocation of costs Production stripping costs are allocated between the inventory produced and the production stripping asset using a life-of- component waste-to-ore (or mineral contained) strip ratio. When the current strip ratio is greater than the estimated life-of- component ratio a portion of the stripping costs is capitalised to the production stripping asset. Asset recognised from stripping activity Inventory Other mineral assets within property, plant and equipment. Depreciation basis Not applicable  On a component-by-component basis using the units of production method based on proven and probable reserves. Depreciation Depreciation of assets, other than land, assets under construction and capitalised exploration and evaluation that are not depreciated, is calculated using either the straight-line (SL) method or units of production (UoP) method, net of residual values, over the estimated useful lives of specific assets. The depreciation method and rates applied to specific assets reflect the pattern in which the asset\u2019s benefits are expected to be used by the Group. The Group\u2019s proved and probable reserves for minerals assets are used to determine UoP depreciation unless doing so results in depreciation charges that do not reflect the asset\u2019s useful life. Where this occurs, alternative approaches to determining reserves are applied, to provide a phasing of periodic depreciation charges that better reflects the asset\u2019s expected useful life. Where assets are dedicated to a mine lease, the useful lives below are subject to the lesser of the asset category\u2019s useful life and the life of the mine lease, unless those assets are readily transferable to another productive mine. Assets classified as held for sale are measured at the lower of their carrying amount and fair value less cost to sell and therefore not depreciated. Recognition and measurement Goodwill Where the fair value of the consideration paid for a business acquisition exceeds the fair value of the identifiable assets, liabilities and contingent liabilities acquired, the difference is treated as goodwill. Where consideration is less than the fair value of acquired net assets, the difference is recognised immediately in the income statement. Goodwill is not amortised and is measured at cost less any impairment losses. Other intangibles The Group capitalises amounts paid for the acquisition of identifiable intangible assets, such as software, licences and initial payments for the acquisition of mineral lease assets, where it is considered that they will contribute to future periods through revenue generation or reductions in cost. These assets, classified as finite life intangible assets, are carried in the balance sheet at the fair value of consideration paid (cost) less accumulated amortisation and impairment charges. Intangible assets with finite useful lives are amortised on a straight-line basis over their useful lives. The estimated useful lives are generally no greater than eight years. Initial payments for the acquisition of intangible mineral lease assets are capitalised and amortised over the term of the permit. A regular review is undertaken of each area of interest to determine the appropriateness of continuing to carry forward costs in relation to that area. Capitalised costs are only carried forward to the extent that they are expected to be recovered through the successful exploitation of the area of interest or alternatively by its sale. To the extent that capitalised expenditure is no longer expected to be recovered, it is charged to the income statement. Assets classified as held for sale are measured at the lower of their carrying amount and fair value less cost to sell and therefore not amortised. Recognition and measurement Impairment tests for all non-financial assets (excluding goodwill) are performed when there is an indication of impairment. Goodwill is tested for impairment at least annually. Where the asset does not generate cash flows that are independent from other assets, the Group estimates the recoverable amount of the cash generating unit (CGU) to which the asset belongs, being the smallest identifiable group of assets that generates cash inflows that are largely independent of the cash inflows from other assets or groups of assets. If the carrying amount of the asset or CGU exceeds its recoverable amount, the asset or CGU is impaired and an impairment loss is charged to the income statement so as to reduce the carrying amount in the balance sheet to its recoverable amount. Previously impaired assets (excluding goodwill as impairment losses are not reversed in subsequent periods) are reviewed for possible reversal of previous impairment at each reporting date. Impairment reversal cannot exceed the carrying amount that would have been determined (net of depreciation) had no impairment loss been recognised for the asset or CGU. Such reversal is recognised in the income statement. There were no reversals of impairment in the current or prior year. How recoverable amount is calculated The recoverable amount is the higher of an asset\u2019s or CGU\u2019s fair value less cost of disposal (FVLCD) and its value in use (VIU). Fair value less cost of disposal FVLCD is an estimate of the amount that a market participant would pay for an asset or CGU, less the cost of disposal. FVLCD for mineral assets is generally determined using independent market assumptions to calculate the present value of the estimated future post-tax cash flows expected to arise from the continued use of the asset, including the anticipated cash flow effects of any capital expenditure to enhance production or reduce cost, and its eventual disposal where a market participant may take a consistent view. Cash flows are discounted using an appropriate post-tax market discount rate to arrive at a net present value of the asset, which is compared against the asset\u2019s carrying value. FVLCD may also take into consideration other market- based indicators of fair value. FVLCD are based primarily on Level 3 inputs as defined in note 24 \u2018Financial risk management\u2019 unless otherwise noted. Value in use VIU is determined as the present value of the estimated future cash flows expected to arise from the continued use of the asset in its present form and its eventual disposal or closure. VIU is determined by applying assumptions specific to the Group\u2019s continued use and cannot take into account future development. These assumptions are different to those used in calculating FVLCD and consequently the VIU calculation is likely to give a different result (usually lower) to a FVLCD calculation. Recognition and measurement Provisions for closure and rehabilitation are recognised by the Group when: \u2013  it has a present legal or constructive obligation as a result of past events \u2013  it is more likely than not that an outflow of resources will be required to settle the obligation \u2013  the amount can be reliably estimated Initial recognition and measurement Subsequent measurement Closure and rehabilitation provisions are initially recognised when an environmental disturbance first occurs. The individual site provisions are an estimate of the expected value of future cash flows required to close the relevant site using current standards and techniques and taking into account risks and uncertainties. Individual site provisions are discounted to their present value using currency specific discount rates aligned to the estimated timing of cash outflows. When provisions for closure and rehabilitation are initially recognised, the corresponding cost is capitalised as an asset, representing part of the cost of acquiring the future economic benefits of the operation. The closure and rehabilitation asset, recognised within property, plant and equipment, is depreciated over the life of the operations. The value of the provision is progressively increased over time as the effect of discounting unwinds, resulting in an expense recognised in net finance costs. The closure and rehabilitation provision is reviewed at each reporting date to assess if the estimate continues to reflect the best estimate of the obligation. If necessary, the provision is remeasured to account for factors such as: \u2013  additional disturbance during the period \u2013  revisions to estimated reserves, resources and lives of operations including any changes to expected operating lives arising from the Group\u2019s latest assessment of the potential impacts of climate change and the transition to a low-carbon economy \u2013  developments in technology \u2013  changes to regulatory requirements and environmental management strategies \u2013  changes in the estimated extent and costs of anticipated activities, including the effects of inflation and movements in foreign exchange rates \u2013  movements in interest rates affecting the discount rate applied Changes to the closure and rehabilitation estimate for operating sites are added to, or deducted from, the related asset and amortised on a prospective basis over the remaining life of the operation, generally applying the units of production method. Costs arising from unforeseen circumstances, such as the contamination caused by unplanned discharges, are recognised as an expense and liability when the event gives rise to an obligation that is probable and capable of reliable estimation. Share capital of BHP Group Limited at 30 June 2023 is composed of the following categories of shares: Ordinary shares fully paid Treasury shares Each fully paid ordinary share of BHP Group Limited carries the right to one vote at a meeting of the Company. Treasury shares are fully paid ordinary shares of BHP Group Limited that are held by the ESOP Trusts for the purpose of issuing shares to employees under the Group\u2019s Employee Share Plans. Treasury shares are recognised at cost and deducted from equity, net of any income tax effects. When the treasury shares are subsequently sold or reissued, any consideration received, net of any directly attributable costs and income tax effects, is recognised as an increase in equity. Any difference between the carrying amount and the consideration, if reissued, is recognised in retained earnings. The following classes of shares existed prior to the Group\u2019s unification on 31 January 2022: Special Voting shares Preference shares  DLC Dividend share Each of BHP Group Limited and BHP Group Plc had issued one Special Voting share to facilitate joint voting by shareholders of BHP Group Limited and BHP Group Plc on Joint Electorate Actions. These shares were bought back for nominal value in January 2022 and subsequently cancelled. Preference shares had the right to repayment of the amount paid up on the nominal value and any unpaid dividends in priority to the holders of any other class of shares in BHP Group Plc on a return of capital or winding up. These shares were acquired by way of gift from J.P. Morgan and subsequently cancelled on 31 January 2022. The DLC Dividend share supported the Dual Listed Company (DLC) equalisation principles in place since the merger in 2001, including the requirement that ordinary shareholders of BHP Group Plc and BHP Group Limited were paid equal cash dividends per share. This share enabled efficient and flexible capital management across the DLC and was issued on 23 February 2016 at par value of US$10. This share was bought back for nominal value in January 2022 and subsequently cancelled. 2023  US$M 2022  US$M 2021  US$M Recognition and measurement Share premium account  \u2212  \u2212 518 The share premium account represented the premium paid on the issue of BHP Group Plc shares recognised in accordance with the UK Companies Act 2006. It was transferred to the common control reserve as part of the unification of the Group's corporate structure. Capital redemption reserve  \u2212  \u2212 177 The capital redemption reserve represented the par value of BHP Group Plc shares that were purchased and subsequently cancelled. It was transferred to the common control reserve as part of unification of the Group's corporate structure. Common control reserve (1,603) (1,603)  \u2212 The common control reserve arose on unification of the Group\u2019s corporate structure and represents the residual on consolidation between BHP Group Ltd\u2019s investment in BHP Group Plc (now known as BHP Group (UK) Ltd) and BHP Group Plc\u2019s share capital, share premium and capital redemption reserve at the time of unification. Employee share awards reserve 171 174 268 The employee share awards reserve represents the accrued employee entitlements to share awards that have been charged to the income statement and have not yet been exercised. Once exercised, the difference between the accumulated fair value of the awards and their historical on-market purchase price is recognised in retained earnings. Cash flow hedge reserve 10 41 100 The cash flow hedge reserve represents hedging gains and losses recognised on the effective portion of cash flow hedges. The cumulative deferred gain or loss on the hedge is recognised in the income statement when the hedged transaction impacts the income statement, or is recognised as an adjustment to the cost of non-financial hedged items. The hedging reserve records the portion of the gain or loss on a hedging instrument in a cash flow hedge that is determined to be an effective hedge relationship. Cost of hedging reserve (1) (19) (54) The cost of hedging reserve represents the recognition of certain costs of hedging for example, basis adjustments, which have been excluded from the hedging relationship and deferred in other comprehensive income until the hedged transaction impacts the income statement. Foreign currency translation reserve (14) (14) 43 The foreign currency translation reserve represents exchange differences arising from the translation of non-US dollar functional currency operations within the Group into US dollars. Equity investments reserve 9 (8) 15 The equity investment reserve represents the revaluation of investments in shares recognised through other comprehensive income. Where a revalued financial asset is sold, the relevant portion of the reserve is transferred to retained earnings. Non-controlling interest contribution reserve 1,441 1,441 1,283 The non-controlling interest contribution reserve represents the excess of consideration received over the book value of net assets attributable to equity instruments when acquired by non-controlling interests. Total reserves 13 12 2,350 Recognition and measurement Cash and short-term deposits in the balance sheet comprise cash at bank and on hand and highly liquid cash deposits with short-term maturities that are readily convertible to known amounts of cash with insignificant risk of change in value. The Group considers that the carrying value of cash and cash equivalents approximate fair value due to their short-term to maturity. Refer to note 22 \u2018Leases\u2019 and note 24 \u2018Financial risk management\u2019 for the recognition and measurement principles for lease liabilities and other financial liabilities. Recognition and measurement All leases with the exception of short-term (under 12 months) and low-value leases are recognised on the balance sheet, as a right-of-use asset and a corresponding interest bearing liability. Lease liabilities are initially measured at the present value of the future lease payments from the lease commencement date and are subsequently adjusted to reflect the interest on lease liabilities, lease payments and any remeasurements due to, for example, lease modifications or a change to future lease payments linked to an index or rate. Lease payments are discounted using the interest rate implicit in the lease or, where the rate is not readily determinable, the interest payments are discounted at the Group\u2019s weighted average incremental borrowing rate, adjusted to reflect factors specific to the lease, including where relevant the currency, tenor and location of the lease. In addition to containing a lease, the Group\u2019s contractual arrangements may include non-lease components. For example, certain mining services arrangements involve the provision of additional services, including maintenance, drilling activities and the supply of personnel. The Group has elected to separate these non-lease components from the lease components in measuring lease liabilities. Non-lease components are accounted for in accordance with the accounting policies applied to each underlying good or service received. Low-value and short-term leases continue to be expensed to the income statement. Variable lease payments not dependent on an index or rate are excluded from lease liabilities, and expensed to the income statement. Right-of-use assets are measured at cost, less any accumulated depreciation and impairment losses, and adjusted for any remeasurement of lease liabilities. The cost will initially correspond to the lease liability, adjusted for initial direct costs, lease payments made prior to lease commencement, capitalised provisions for closure and rehabilitation and any lease incentives received. The lease asset and liability associated with all index-linked freight contracts, including continuous voyage charters (CVCs), are measured at each reporting date based on the prevailing freight index (generally the Baltic C5 index). Lease costs are recognised in the income statement over the lease term in the form of depreciation on the right-of-use asset and the unwinding of finance charges on the lease liability. Where the Group is the operator of an unincorporated joint operation and all investors are parties to a lease, the Group recognises its proportionate share of the lease liability and associated right-of-use asset. In the event the Group is the sole signatory to a lease, and therefore has the sole legal obligation to make lease payments, the lease liability is recognised in full. Where the associated right-of-use asset is sub-leased (under a finance sub-lease) to a joint operation, for instance where it is dedicated to a single operation and the joint operation has the right to direct the use of the asset, the Group (as lessor) recognises its proportionate share of the right-of-use asset and a net investment in the lease, representing amounts to be recovered from the other parties to the joint operation. If the Group is not party to the head lease contract but sub-leases the associated right-of-use asset (as lessee), it recognises its proportionate share of the right-of-use asset and a lease liability which is payable to the operator. Recognition and measurement Interest income is accrued using the effective interest rate method. Finance costs are expensed as incurred, except where they relate to the financing of construction or development of qualifying assets. 24.2 Recognition and measurement All financial assets and liabilities, other than derivatives and trade receivables, are initially recognised at the fair value of consideration paid or received, net of transaction costs as appropriate. Financial assets are initially recognised on their trade date. Financial assets are subsequently carried at fair value or amortised cost based on: \u2013  the Group\u2019s purpose, or business model, for holding the financial asset \u2013  whether the financial asset\u2019s contractual terms give rise to cash flows that are solely payments of principal and interest The resulting Financial Statements classifications of financial assets can be summarised as follows: Contractual cash flows Business model Category Solely principal and interest Hold in order to collect contractual cash flows Amortised cost Solely principal and interest Hold in order to collect contractual cash flows and sell Fair value through other comprehensive income Solely principal and interest Hold in order to sell Fair value through profit or loss Other Any of those mentioned above Fair value through profit or loss Solely principal and interest refers to the Group receiving returns only for the time value of money and the credit risk of the counterparty for financial assets held. The main exceptions for the Group are provisionally priced receivables and derivatives which are measured at fair value through profit or loss under IFRS 9. The Group has the intention of collecting payment directly from its customers in most cases, however the Group also participates in receivables financing programs in respect of selected customers. Receivables in these portfolios which are classified as \u2018hold in order to sell\u2019, are provisionally priced receivables and are therefore held at fair value through profit or loss prior to sale to the financial institution. With the exception of derivative contracts and provisionally priced trade payables which are carried at fair value through profit or loss, the Group\u2019s financial liabilities are classified as subsequently measured at amortised cost. The Group may in addition elect to designate certain financial assets or liabilities at fair value through profit or loss or to apply hedge accounting where they are not mandatorily held at fair value through profit or loss. Fair value measurement The carrying amount of financial assets and liabilities measured at fair value is principally calculated based on inputs other than quoted prices that are observable for these financial assets or liabilities, either directly (i.e. as unquoted prices) or indirectly (i.e. derived from prices). Where no price information is available from a quoted market source, alternative market mechanisms or recent comparable transactions, fair value is estimated based on the Group\u2019s views on relevant future prices, net of valuation allowances to accommodate liquidity, modelling and other risks implicit in such estimates. The inputs used in fair value calculations are determined by the relevant segment or function. The functions support the assets and operate under a defined set of accountabilities authorised by the Executive Leadership Team. Movements in the fair value of financial assets and liabilities may be recognised through the income statement or in other comprehensive income according to the designation of the underlying instrument.  For financial assets and liabilities carried at fair value, the Group uses the following to categorise the inputs to the valuation method used based on the lowest level input that is significant to the fair value measurement as a whole: IFRS 13 Fair value hierarchy Level 1 Level 2 Level 3 Valuation inputs Based on quoted prices (unadjusted) in active markets for identical financial assets and liabilities. Based on inputs other than quoted prices included within Level 1 that are observable for the financial asset or liability, either directly (i.e. as unquoted prices) or indirectly (i.e. derived from prices). Based on inputs not observable in the market using appropriate valuation models, including discounted cash flow modelling. 24.4  Derivatives and hedge accounting The Group uses derivatives to hedge its exposure to certain market risks and may elect to apply hedge accounting. Hedge accounting Derivatives are included within financial assets or liabilities at fair value through profit or loss unless they are designated as effective hedging instruments. Financial instruments in this category are classified as current if they are due or expected to be settled within 12 months otherwise they are classified as non-current. Where hedge accounting is applied, at the start of the transaction, the Group documents the type of hedge, the relationship between the hedging instrument and hedged items and its risk management objective and strategy for undertaking various hedge transactions. The documentation also demonstrates that the hedge is expected to be effective. The Group applies the following types of hedge accounting to its derivatives hedging the interest rate and currency risks of its notes and debentures: \u2013  Fair value hedges \u2013 the fair value gain or loss on interest rate and cross currency swaps relating to interest rate risk, together with the change in the fair value of the hedged fixed rate borrowings attributable to interest rate risk are recognised immediately in the income statement. If the hedge no longer meets the criteria for hedge accounting, the fair value adjustment on the note or debenture is amortised to the income statement over the period to maturity using a recalculated effective interest rate. \u2013  Cash flow hedges \u2013 changes in the fair value of cross currency interest rate swaps which hedge foreign currency cash flows on the notes and debentures are recognised directly in other comprehensive income and accumulated in the cash flow hedging reserve. To the extent a hedge is ineffective, changes in fair value are recognised immediately in the income statement. When a hedging instrument expires, or is sold, terminated or exercised, or when a hedge no longer meets the criteria for hedge accounting, any cumulative gain or loss existing in equity at that time remains in equity and is amortised to the income statement over the period to the hedged item\u2019s maturity. When hedged, the Group hedges the full notional value of notes or debentures. However, certain components of the fair value of derivatives are not permitted under IFRS 9 to be included in the hedge accounting above. Certain costs of hedging are permitted to be recognised in other comprehensive income. Any change in the fair value of a derivative that does not qualify for hedge accounting, or is ineffective in hedging the designated risk due to contractual differences between the hedged item and hedging instrument, is recognised immediately in the income statement. The table below shows the carrying amounts of the Group\u2019s notes and debentures by currency and the derivatives which hedge them: \u2013  The carrying amount of the notes and debentures includes foreign exchange remeasurement to period-end rates and fair value adjustments when included in a fair value hedge. \u2013  The breakdown of the hedging derivatives includes remeasurement of foreign currency notional values at period-end rates, fair value movements due to interest rate risk, foreign currency cash flows designated into cash flow hedges, costs of hedging recognised in other comprehensive income, ineffectiveness recognised in the income statement and accruals or prepayments. \u2013  The hedged value of notes and debentures includes their carrying amounts adjusted for the offsetting derivative fair value movements due to foreign currency and interest rate risk remeasurement. Recognition and measurement The fair value at grant date of equity-settled share awards is charged to the income statement over the period for which the benefits of employee services are expected to be derived. The fair values of awards granted were estimated using a Monte Carlo simulation methodology and Black-Scholes option pricing technique and consider the following factors: \u2013  exercise price \u2013  expected life of the award \u2013  current market price of the underlying shares \u2013  expected volatility using an analysis of historic volatility over different rolling periods. For the LTIP, it is calculated for all sector comparators and the published MSCI World Index \u2013  expected dividends \u2013  risk-free interest rate, which is an applicable government bond rate \u2013  market-based performance hurdles \u2013  non-vesting conditions Where awards are forfeited because non-market-based vesting conditions are not satisfied, the expense previously recognised is proportionately reversed. The tax effect of awards granted is recognised in income tax expense, except to the extent that the total tax deductions are expected to exceed the cumulative remuneration expense. In this situation, the excess of the associated current or deferred tax is recognised in equity and forms part of the employee share awards reserve. The fair value of awards as presented in the tables above represents the fair value at grant date. In respect of employee share awards, the Group utilises the BHP Group Limited Employee Equity Trust. The trustee of this trust is an independent company, resident in Jersey. The trust uses funds provided by the Group to acquire ordinary shares to enable awards to be made or satisfied. The ordinary shares may be acquired by purchase in the market or by subscription at not less than nominal value. Recognition and measurement Provisions are recognised by the Group when: \u2013  there is a present legal or constructive obligation as a result of past events \u2013  it is more likely than not that a permanent outflow of resources will be required to settle the obligation \u2013  the amount can be reliably estimated and measured at the present value of management\u2019s best estimate of the cash outflow required to settle the obligation at the reporting date Provision Description Employee benefits Liabilities for benefits accruing to employees up until the reporting date in respect of wages and salaries, annual leave and any accumulating sick leave are recognised in the period the related service is rendered. Liabilities recognised in respect of short-term employee benefits expected to be settled within 12 months are measured at the amounts expected to be paid when the liabilities are settled. Liabilities for other long-term employee benefits, including long service leave, are measured as the present value of estimated future payments for the services provided by employees up to the reporting date. Liabilities that are not expected to be settled within 12 months are discounted at the reporting date using market yields of high-quality corporate bonds or government bonds for countries where there is no deep market for corporate bonds. The rates used reflect the terms to maturity and currency that match, as closely as possible, the estimated future cash outflows. In relation to industry-based long service leave funds, the Group\u2019s liability, including obligations for funding shortfalls, is determined after deducting the fair value of dedicated assets of such funds. Liabilities for short and long-term employee benefits (other than unpaid wages and salaries) are disclosed within employee benefits. Other liabilities for unpaid wages and salaries related to the current period are recognised in other creditors. Review of employee allowances and entitlements On 1 June 2023, the Group disclosed the identification of two issues with certain allowances and entitlements affecting a number of current and former employees in Australia. The identified issues relate to rostered employees having leave incorrectly deducted on public holidays since 2010 (Leave issue) and certain employees at Port Hedland being entitled to additional allowances due to an error with the employment entity in their contract (Port Hedland issue). The Group self-reported the issues to the Fair Work Ombudsman in Australia. The Group has applied extensive resources to the review and analysis of its records, with a dedicated team established to investigate and remediate the issues. Since the date of the announcement, the Group has progressed its analysis and has commenced contacting impacted employees. The Group has commenced paying additional allowances to those current employees impacted by the Port Hedland issue. The Group has also corrected the leave balances of current employees impacted by the Leave Issue. The Group\u2019s current best estimate of the cost of remediating the two issues, recognised in employee benefit provisions at 30 June 2023, is US$265 million, incorporating on-costs including associated superannuation and interest payments. The calculation of this provision involved a substantial volume of data and a significant degree of complexity with further detailed modelling and validation required to determine the final cost of remediation. As such, uncertainty remains in the amount and timing of final remediation costs, with the outcomes also subject to continuing engagement with regulatory authorities, including the Fair Work Ombudsman. A further US$15 million of other related costs were recognised in the year ended 30 June 2023, which do not form part of the employee benefit provision. As the Group has applied judgement in determining the provision for 30 June 2023, there is a risk that the provision may be adjusted in future reporting periods as the remediation process continues. The Group has also engaged a global assurance firm to conduct a thorough review of the Group\u2019s payroll systems. As this review is ongoing there is a risk that other instances of non-compliance requiring remediation may be identified and, as such, that associated provisions may be recognised in future reporting periods. Restructuring Restructuring provisions are recognised when: \u2013  the Group has developed a detailed formal plan identifying the business or part of the business concerned, the location and approximate number of employees affected, a detailed estimate of the associated costs, and an appropriate timeline \u2013  the restructuring has either commenced or been publicly announced and can no longer be withdrawn Payments that are not expected to be settled within 12 months of the reporting date are measured at the present value of the estimated future cash payments expected to be made by the Group. Post-retirement employee benefits Defined contribution pension schemes and multi-employer pension schemes For defined contribution schemes or schemes operated on an industry-wide basis where it is not possible to identify assets attributable to the participation by the Group\u2019s employees, the pension charge is calculated on the basis of contributions payable. The Group contributed US$358 million during the financial year (2022: US$324 million; 2021: US$301 million) to defined contribution plans and multi-employer defined contribution plans. These contributions are expensed as incurred. Defined benefit pension and post-retirement medical schemes The Group operates or participates in a number of defined benefit pension schemes throughout the world, all of which are closed to new entrants. The funding of the schemes complies with local regulations. The assets of the schemes are generally held separately from those of the Group and are administered by trustees or management boards. The Group also operates a number of unfunded post-retirement medical schemes in the United States, Canada and Europe. For defined benefit schemes, an asset or liability is recognised in the balance sheet based at the present value of defined benefit obligations less, where funded, the fair value of plan assets, except that any such asset cannot exceed the present value of expected refunds from and reductions in future contributions to the plan. Full actuarial valuations are prepared by local actuaries for all schemes, using discount rates based on market yields at the reporting date on high-quality corporate bonds or by reference to national government bonds if high-quality corporate bonds are not available. Where funded, scheme assets are invested in a diversified range of asset classes, predominantly comprising bonds and equities. 33  Related party transactions The Group\u2019s related parties are predominantly subsidiaries, associates and joint ventures, and key management personnel of the Group. Disclosures relating to key management personnel are set out in note 25 \u2018Key management personnel\u2019. Transactions between each parent company and its subsidiaries are eliminated on consolidation and are not disclosed in this note. \u2013  All transactions to/from related parties are made at arm\u2019s length, i.e. at normal market prices and rates and on normal commercial terms. \u2013  Outstanding balances at year-end are unsecured and settlement occurs in cash. Loan amounts owing from related parties represent secured loans made to associates and joint ventures under co-funding arrangements. Such loans are made on an arm\u2019s length basis. \u2013  No guarantees are provided or received for any related party receivables or payables. \u2013  No provision for expected credit losses has been recognised in relation to any outstanding balances and no expense has been recognised in respect of expected credit losses due from related parties. \u2013  There were no other related party transactions in the year ended 30 June 2023 (2022: US$ nil), other than those with post-employment benefit plans for the benefit of Group employees. These are shown in note 27 \u2018Employee benefits, restructuring and post-retirement employee benefits provisions\u2019. \u2013  Related party transactions with Samarco are described in note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 A contingent liability is a possible obligation arising from past events and whose existence will be confirmed only by occurrence or non-occurrence of one or more uncertain future events not wholly within the control of the Group. A contingent liability may also be a present obligation arising from past events but is not recognised on the basis that an outflow of economic resources to settle the obligation is not viewed as probable, or the amount of the obligation cannot be reliably measured. When the Group has a present obligation, an outflow of economic resources is assessed as probable and the Group can reliably measure the obligation, a provision is recognised. The Group has entered into various counter-indemnities of bank and performance guarantees related to its own future performance, which are in the normal course of business. The likelihood of these guarantees being called upon is considered remote. The Group presently has tax matters, litigation and other claims, for which the timing of resolution and potential economic outflow are uncertain. Obligations assessed as having probable future economic outflows capable of reliable measurement are provided at reporting date and matters assessed as having possible future economic outflows capable of reliable measurement are included in the total amount of contingent liabilities above. Individually significant matters, including narrative on potential future exposures incapable of reliable measurement, are disclosed below, to the extent that disclosure does not prejudice the Group. 39  New and amended accounting standards and interpretations and changes to accounting policies New and amended accounting pronouncements adopted in the current year Amendment to IAS 16/AASB 116 \u2018Property, Plant and Equipment\u2019 (IAS 16) On 1 July 2022, the Group adopted an amendment to IAS 16 that requires an entity to recognise the sales proceeds from selling items produced while preparing property, plant and equipment for its intended use, along with the costs associated with producing that revenue, in profit or loss, instead of deducting the amounts received from the cost of the asset. The amendment applies retrospectively to items of property, plant and equipment made available for use on or after 1 July 2020. However, no significant impacts have been identified in respect of the years ended 30 June 2022 and 30 June 2021 and, as such, comparative period financial information has not been restated. Amendment to IAS 12/AASB112 \u2018Income taxes\u2019 (IAS 12) At 30 June 2023, the Group has adopted amendments to IAS12 issued by the IASB and AASB on 23 May 2023 and 27 June 2023, respectively, in relation to the Organisation for Economic Co-operation and Development (OECD)/G20 Inclusive Framework on Base Erosion and Profit Shifting (BEPS) Pillar Two income tax. The amendments introduced a temporary exception to the requirements of IAS 12 under which a company does not recognise or disclose information about deferred tax assets and liabilities related to the proposed Pillar Two model rules. Refer to note 6 \u2018Income tax expense\u2019 for more information. New and amended accounting pronouncements on issue but not yet effective A number of other accounting standards and interpretations have been issued and will be applicable in future periods. While these remain subject to ongoing assessment, no significant impacts have been identified to date. These pronouncements have not been applied in the preparation of these Financial Statements.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSummaryOfSignificantAccountingPoliciesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-611": {
   "value": "Basis of preparation<span class=\"_ _39c\"> </span>The Consolidated Financial Statements (Financial Statements) comprise BHP Group Limited (BHP<span class=\"_ _2\"></span> or the Company) together with its controlled entities (Group) for the year ended 30 June 2023. BHP Group Limited, incorporated and domiciled in <span class=\"_ _2\"></span>Australia, is a for-profit company limited by shares which are publicly traded on the <span class=\"_ _2\"></span>Australian Securities Exchange.<span class=\"_ _39c\"> </span>BHP Group Limited also has a standard listing on the London Stock Exchange (LSE), a secondary listing on the Johannesburg Stock Exchange and is listed on the New Y<span class=\"_ _2a\"></span>ork Stock Exchange (NYSE) in the United States.<span class=\"_ _39c\"> </span>Prior to 31 January 2022, BHP Group Limited and BHP<span class=\"_ _2\"></span> Group Plc, an incorporated UK-listed company<span class=\"_ _2\"></span>, operated together as a single-for-profit economic entity under a Dual Listed Company (DLC) structure comprising a common Board of Directors, unified management structure and joint objectives. On 31 January 2022, BHP unified its corporate structure under BHP Group Limited. Directors of BHP have included information in the Financial Statements they deem to be material and relevant to the understanding of the Financial Statements. Disclosure may be considered material and relevant if the dollar amount is significant due to its size or nature, or the information is important to understand the: \u2013  <span class=\"ff70\">Group\u2019s current year results<span class=\"_ _39c\"> </span></span>\u2013  impact of significant changes in the Group\u2019s business or \u2013  <span class=\"ff70\">aspects of the Group\u2019s operations that are important to </span>future performance The Board of Directors resolved to authorise the issue of the financial report on 22 <span class=\"_ _2\"></span>August 2023.<span class=\"_ _39c\"> </span>Basis of preparation and measurement<span class=\"_ _39c\"> </span>The Group\u2019s Financial Statements as at and for the year ended 30 June 2023:<span class=\"_ _39c\"> </span>\u2013  are a consolidated general purpose financial report<span class=\"_ _39c\"> </span>\u2013  <span class=\"ff70\">have been prepared in accordance with the requirements of:<span class=\"_ _39c\"> </span></span>\u2013  <span class=\"ff70\">the Australian Corporations <span class=\"_ _2a\"></span>Act 2001 (Corporations Act 2001)<span class=\"_ _39c\"> </span></span>\u2013  <span class=\"ff70\">Australian Accounting Standards and other authoritative </span>pronouncements of the <span class=\"_ _2\"></span>Australian <span class=\"_ _2\"></span>Accounting Standards Board (AASB) and International Financial Reporting Standards as issued by the International <span class=\"_ _2\"></span>Accounting Standards Board (IASB) (collectively referred to as IFRS)<span class=\"_ _39c\"> </span>\u2013  <span class=\"ff70\"> are prepared on a going concern basis as the Directors:<span class=\"_ _39c\"> </span></span>\u2013  <span class=\"ff70\">have made an assessment of the Group\u2019s ability to continue as a </span>going concern for the 12 months from the date of this report \u2013  <span class=\"ff70\">consider it appropriate to adopt the going concern basis of accounting </span>in preparing the Group\u2019s Financial Statements<span class=\"_ _39c\"> </span>\u2013  <span class=\"ff70\">measure items on the basis of historical cost principles, except for the </span>following items:<span class=\"_ _39c\"> </span>\u2013  derivative financial instruments and certain other financial assets and liabilities, which are carried at fair value \u2013  non-current assets or disposal groups that are classified as held-<span class=\"_ _39c\"> </span>for-sale or held-for-distribution, which are measured at the lower of carrying amount and fair value less costs to sell<span class=\"_ _39c\"> </span>\u2013  include significant accounting policies in the notes to the Financial Statements that summarise the recognition and measurement basis used and are relevant to an understanding of the Financial Statements<span class=\"_ _39c\"> </span>\u2013  <span class=\"ff70\">apply a presentation currency of US dollars, consistent with the </span>predominant functional currency of the Group\u2019s operations. <span class=\"_ _2\"></span>Amounts are rounded to the nearest million dollars, unless otherwise stated, in accordance with <span class=\"_ _2\"></span>ASIC (Rounding in Financial/Directors\u2019<span class=\"_ _2\"></span> Reports) Instrument 2016/191 \u2013  present reclassified comparative information where required for consistency with the current year<span class=\"_ _0\"></span>\u2019s presentation<span class=\"_ _39c\"> </span>\u2013  <span class=\"ff70\">adopt all new and amended standards and interpretations under IFRS </span>that are mandatory for application in periods beginning on 1 July 2022. None had a significant impact on the Financial Statements. Refer note 39 \u2018New and amended accounting standards and interpretations and changes to accounting policies\u2019<span class=\"_ _2\"></span> for details \u2013  <span class=\"ff70\">have not early adopted any standards and interpretations that have </span>been issued or amended but are not yet effective, other than as outlined in note 39 \u2018New and amended accounting standards and interpretations and changes to accounting policies\u2019<span class=\"_ _2\"></span> The accounting policies are consistently applied by all entities included in the Financial Statements.<span class=\"_ _39c\"> </span>In assessing the appropriateness of the going concern assumption over the going concern period, management has stress tested BHP\u2019s most recent financial projections to incorporate a range of potential future outcomes by considering BHP\u2019s principal risks. <span class=\"_ _2\"></span>The Group\u2019s financial forecasts, including downside commodity price and production scenarios, demonstrate that the Group believes that it has sufficient financial resources to meet its obligations as they fall due throughout the going concern period. <span class=\"_ _2\"></span>As such, the Financial Statements continue to be prepared on the going concern basis.<span class=\"_ _39c\"> </span>Principles of consolidation<span class=\"_ _39c\"> </span>In preparing the Financial Statements, the effects of all intragroup balances and transactions have been eliminated.<span class=\"_ _39c\"> </span>A<span class=\"_ _2\"></span> list of significant entities in the Group, including subsidiaries, joint arrangements and associates at 30 June 2023 is contained in note 30 \u2018Subsidiaries\u2019, note 31 \u2018Investments accounted for using the equity method\u2019<span class=\"_ _2\"></span> and note 32 \u2018Interests in joint operations\u2019.<span class=\"_ _39c\"> </span>Subsidiaries<span class=\"fc3\">: The Financial Statements of the Group include the </span>consolidation of BHP Group Limited (the Company or parent entity) and its subsidiaries, being the entities controlled by the parent entity during the year (and, in prior periods, BHP Group Plc and its subsidiaries while the DLC was in effect). Control exists where the Group:<span class=\"_ _39c\"> </span>\u2013  <span class=\"ff70\">has power over the investee<span class=\"_ _39c\"> </span></span>\u2013  <span class=\"ff70\">is exposed to, or has rights to, variable returns from its involvement with </span>the entity \u2013  <span class=\"ff70\">has the ability to affect those returns through its power to direct the </span>activities of the entity<span class=\"_ _39c\"> </span>The ability to approve the operating and capital budget of an entity and the ability to appoint key management personnel are decisions that demonstrate that the Group has the existing rights to direct the relevant activities of an entity<span class=\"_ _2\"></span>. The results of subsidiaries acquired or disposed of during the year are included in profit or loss from the date the Company gains control until the date when the Company ceases to control the subsidiary<span class=\"_ _2\"></span>. When the Group loses control of a subsidiary<span class=\"_ _2\"></span>, the gain or loss on disposal is recognised in profit or loss.<span class=\"_ _39c\"> </span>Where the Group\u2019s interest is less than 100 per cent, the interest attributable to outside shareholders is reflected in non-controlling interests. Changes in the Group\u2019s interests in subsidiaries that do not result in a loss of control are accounted for as equity transactions. The carrying amount of the Group\u2019s interests and the non-controlling interests are adjusted to reflect the changes in their relative interests in the subsidiaries. Any difference between the amount by which the non-controlling interests are adjusted and the fair value of the consideration paid or received is recognised directly in equity and attributed to the owners of the Company<span class=\"_ _2\"></span>. The financial information of subsidiaries is prepared for the same reporting period as the Group. The acquisition method of accounting is used to account for the Group\u2019s business combinations.<span class=\"_ _39c\"> </span>Joint arrangements<span class=\"fc3\">: The Group undertakes a number of business activities </span>through joint arrangements, which exist when two or more parties have joint control. Joint arrangements are classified as either joint operations or joint ventures, based on the contractual rights and obligations between the parties to the arrangement:<span class=\"_ _39c\"> </span>\u2013  <span class=\"ff73 fc2\">Joint operations</span><span class=\"ff70\">: A<span class=\"_ _2a\"></span> joint operation is an arrangement in which the Group </span>shares joint control, primarily via contractual arrangements with other parties. In a joint operation, the Group has rights to the underlying assets and obligations for the liabilities relating to the arrangement.<span class=\"_ _39c\"> </span><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs48\">This includes situations where the parties benefit from the joint activity </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs49\">through a share of the output, rather than by receiving a share of the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4a\">results of trading. In relation to the Group\u2019s interest in a joint operation, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4b\">the Group recognises: its assets and liabilities, including its share of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4c\">any assets and liabilities held or incurred jointly; revenue from the sale </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4d\">of its share of the output and its share of any revenue generated from </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4e\">the sale of the output by the joint operation; and its expenses including </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4f\">its share of expenses incurred jointly<span class=\"_ _2\"></span>. <span class=\"_ _2\"></span>All such amounts are allocated </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs50\">in accordance with the terms of the arrangement, which is usually in </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs51\">proportion to the Group\u2019s interest in the joint operation.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs52\">The Group accounts for the assets, liabilities, revenue and expenses </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs53\">relating to its interest in a joint operation in accordance with the IFRS </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs54\">Standards applicable to the particular assets, liabilities, revenue </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs55\">and expenses.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs56\">\u2013  <span class=\"ff73 fc2\">Joint ventures</span><span class=\"ff70\">: A<span class=\"_ _2a\"></span> joint venture is a joint arrangement in which the parties </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs57\">that share joint control have rights to the net assets of the arrangement. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs58\">A<span class=\"_ _2\"></span> separate vehicle, not the parties, will have the rights to the assets and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs59\">obligations for the liabilities relating to the arrangement. More than an </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs5a\">insignificant share of output from a joint venture is sold to third parties, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5b\">which indicates the joint venture is not dependent on the parties to the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5c\">arrangement for funding, nor do the parties have an obligation for the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5d\">liabilities of the arrangement. Joint ventures are accounted for using the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5e\">equity method as outlined below<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs5f\">Associates<span class=\"fc3\">: The Group accounts for investments in associates using the </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs60\">equity method as outlined below<span class=\"_ _2\"></span>. <span class=\"_ _2\"></span>An entity is considered an associate </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs61\">where the Group is deemed to have significant influence but not control or </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs62\">joint control. Significant influence is presumed to exist where the Group:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs63\">\u2013  <span class=\"ff70\">has over 20 per cent but less than 50 per cent of the voting rights of an </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs64\">entity<span class=\"_ _2\"></span>, unless it can be clearly demonstrated that this is not the case or<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs65\">\u2013  <span class=\"ff70\">holds less than 20 per cent of the voting rights of an entity; however, has </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs66\">the power to participate in the financial and operating policy decisions </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs67\">affecting the entity<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs68\">The Group uses the term \u2018equity accounted investments\u2019<span class=\"_ _2\"></span> to refer to joint </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs69\">ventures and associates collectively<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs6a\">Under the equity method, an investment in an associate or a joint venture </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs6b\">is recognised initially at cost and adjusted thereafter to recognise the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs6c\">Group\u2019s share of the profit or loss and other comprehensive income of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs6d\">the associate or joint venture. When the Group\u2019s share of losses of an </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs6e\">associate or a joint venture exceeds the Group\u2019s interest in that associate </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs6f\">or joint venture, the Group discontinues recognising its share of further </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs70\">losses. <span class=\"_ _2\"></span>Additional losses are recognised only to the extent that the Group </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs71\">has incurred legal or constructive obligations or made payments on behalf </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs72\">of the associate or joint venture.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs73\">Foreign currencies<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs74\">T<span class=\"_ _2\"></span>ransactions related to the Group\u2019s worldwide operations are conducted </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs75\">in a number of foreign currencies. The majority of the subsidiaries, joint </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs76\">arrangements and associates within each of the operations have assessed </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs77\">US dollars as the functional currency<span class=\"_ _2\"></span>, however<span class=\"_ _2\"></span>, some subsidiaries, joint </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls1c ws2 gs78\">arrangements and associates have functional currencies other than US dollars.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs79\">T<span class=\"_ _2\"></span>ransactions and monetary items denominated in foreign currencies are </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7a\">translated into US dollars as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs7b\">Foreign currency item<span class=\"_ _56\"> </span><span class=\"ff72\">Applicable exchange rate<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs7c\">T<span class=\"_ _2\"></span>ransactions<span class=\"_ _28\"> </span>Date of underlying transaction<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs7d\">Monetary assets and liabilities<span class=\"_ _12a\"> </span>Period-end rate<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7e\">Foreign exchange gains and losses resulting from translation are </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7f\">recognised in the income statement, except for qualifying cash flow hedges </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs80\">(which are deferred to equity) and foreign exchange gains or losses on </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs81\">foreign currency provisions for site closure and rehabilitation costs (which </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs82\">are capitalised in property<span class=\"_ _2\"></span>, plant and equipment for operating sites).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs83\">On consolidation, the assets, liabilities, income and expenses of foreign </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs84\">operations with non-US dollar functional currencies are translated into US </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs85\">dollars using the following applicable exchange rates:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs86\">Foreign currency amount<span class=\"_ _200\"> </span><span class=\"ff72\">Applicable exchange rate<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs87\">Income and expenses<span class=\"_ _148\"> </span>Date of underlying transaction<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs88\">Assets and liabilities<span class=\"_ _6\"> </span>Period-end rate<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs89\">Equity<span class=\"_ _253\"> </span>Historical rate<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs8a\">Reserves<span class=\"_ _254\"> </span>Historical rate<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8b\">Foreign exchange differences resulting from translation are initially </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8c\">recognised in the foreign currency translation reserve and subsequently </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8d\">transferred to the income statement on disposal of a foreign operation.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff72 fs11 fc3 sc0 ls5 ws2 gs8e\">Significant accounting policies, judgements and estimates<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8f\">The Group\u2019s accounting policies require the use of judgement, estimates </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs90\">and assumptions. <span class=\"_ _2\"></span>All judgements, estimates and assumptions are based </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs91\">on the most current facts and circumstances and are reassessed on an </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs92\">ongoing basis. <span class=\"_ _2\"></span>Actual results in future reporting periods may differ for </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs93\">these estimates under different assumptions and conditions. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs94\">Further information regarding the Group\u2019s significant judgements and key </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs95\">estimates and assumptions, being those where changes may materially </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs96\">affect financial results and the carrying amount of assets and liabilities </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs97\">to be reported in the next reporting period, are embedded within the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs98\">following notes:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs99\">Note<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs9a\">4 <span class=\"_ _62\"> </span><span class=\"ff71\">Significant events \u2013 Samarco dam failure<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs9b\">6 <span class=\"_ _62\"> </span>T<span class=\"_ _2a\"></span>axation<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 lsd3 ws102 gs9c\">11<span class=\"_ _c\"> </span><span class=\"ls5 ws2\">Overburden removal costs<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 lsd3 ws102 gs9d\">11<span class=\"_ _c\"> </span><span class=\"ls5 ws2\">Depreciation of property<span class=\"_ _2\"></span>, plant and equipment<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs9e\">13<span class=\"_ _6a\"> </span>Impairment of non-current assets<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs9f\">15<span class=\"_ _6a\"> </span>Closure and rehabilitation provisions<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gsa0\">22<span class=\"_ _6a\"> </span>Leases<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gsa1\">29 <span class=\"_ _74\"> </span>Business combinations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsa2\">Additional information including sensitivity analysis, where appropriate, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsa3\">has been provided in the relevant notes to enhance an understanding </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gsa4\">of the impact of key estimates and assumptions on the Group\u2019s financial </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsa5\">position and performance.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gsa6\">Reserve estimates<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsa7\">Reserves are estimates of the amount of product that can be </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsa8\">demonstrated to be able to be economically and legally extracted from </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsa9\">the Group\u2019s properties. In order to estimate reserves, assumptions are </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsaa\">required about a range of technical and economic factors, including </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gsab\">quantities, qualities, production techniques, recovery efficiency<span class=\"_ _2\"></span>, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsac\">production and transport costs, commodity supply and demand, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsad\">commodity and carbon prices and exchange rates. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gsae\">Estimating the quantity and/or quality of reserves requires the size, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsaf\">shape and depth of ore bodies to be determined by analysing geological </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsb0\">data, such as drilling samples and geophysical survey interpretations. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsb1\">Economic assumptions used to estimate reserves change from period-<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsb2\">to-period as additional technical and operational data is generated. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gsb3\">This process may require complex and difficult geological judgements to </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsb4\">interpret the data.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls5 ws2 gsb5\">Reserve impact on financial reporting<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws9f gsb6\">Estimates of reserves may change from period-to-period as the economic </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsb7\">assumptions used to estimate reserves change and additional geological </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsb8\">data is generated during the course of operations. Changes in reserves </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gsb9\">may affect the Group\u2019<span class=\"_ _2\"></span>s financial results and financial position in a number </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsba\">of ways, including:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gsbb\">\u2013  <span class=\"ff70\">asset carrying values may be affected due to changes in estimated </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsbc\">future production levels<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gsbd\">\u2013  <span class=\"ff70\">depreciation, depletion and amortisation charged to the income </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsbe\">statement may change where such charges are determined on the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsbf\">units of production basis, or where the useful economic lives of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsc0\">assets change<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gsc1\">\u2013  <span class=\"ff70\">overburden removal costs recorded on the balance sheet or charged </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsc2\">to the income statement may change due to changes in stripping ratios </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsc3\">or the units of production basis of depreciation<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gsc4\">\u2013  <span class=\"ff70\">closure and rehabilitation provisions may change where changes in </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsc5\">estimated reserves affect expectations about the timing or cost of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gsc6\">these activities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gsc7\">\u2013  <span class=\"ff70\">the carrying amount of deferred tax assets may change due to </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gsc8\">changes in estimates of the likely recovery of the tax benefits<span class=\"_ _39c\"> </span></div>1.<span class=\"_ _0\"></span>6<span class=\"_ _43\"></span> <span class=\"_ _ce\"> </span><span class=\"fc5 ls21 ws2\">Notes to the Financial S<span class=\"_ _2\"></span>tat<span class=\"_ _0\"></span>ements<span class=\"_ _39c\"> </span></span>Performance<span class=\"_ _39c\"> </span>1 <span class=\"_ _47\"> </span>Segment reporting<span class=\"_ _39c\"> </span>Reportable segments<span class=\"_ _39c\"> </span>The Group operated three reportable segments during FY2023, which are aligned with the commodities that are extracted and marketed and reflect the structure used by the Group\u2019s management to assess the performance of the Group.<span class=\"_ _39c\"> </span>Reportable segment<span class=\"_ _11b\"> </span>Principal activities<span class=\"_ _39c\"> </span>Copper <span class=\"_ _e3\"> </span><span class=\"ff71\">Mining of copper, silver<span class=\"_ _2a\"></span>, zinc, molybdenum, uranium and gold<span class=\"_ _39c\"> </span></span>Iron Ore<span class=\"_ _20a\"> </span>Mining of iron ore<span class=\"_ _39c\"> </span>Coal<span class=\"_ _255\"> </span>Mining of metallurgical coal and energy coal<span class=\"_ _39c\"> </span>Group and unallocated items includes functions, other unallocated operations including Potash, Nickel West, West Musgrave, legacy assets and consolidation adjustments. Revenue not attributable to reportable segments comprises the sale of freight and fuel to third parties, as well as revenues from unallocated operations. Exploration and technology activities are recognised within relevant segments.<span class=\"_ _39c\"> </span>Y<span class=\"_ _2\"></span>ear ended 30 June 2023  US$M<span class=\"_ _13e\"> </span>Copper<span class=\"_ _19b\"> </span>Iron Ore<span class=\"_ _9c\"> </span>Coal<span class=\"_ _39c\"> </span>Group and unallocated items/ eliminations<span class=\"_ _cc\"> </span>Group total<span class=\"_ _39c\"> </span>Revenue<span class=\"_ _155\"> </span><span class=\"ff6f\">16,027<span class=\"_ _242\"> </span>24,812<span class=\"_ _1c\"> </span>10,958<span class=\"_ _140\"> </span>2,020<span class=\"_ _1c\"> </span>53,817<span class=\"_ _39c\"> </span></span>Inter-segment revenue<span class=\"_ _256\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _39c\"> </span></span>T<span class=\"_ _2\"></span>otal revenue<span class=\"_ _13a\"> </span>16,027<span class=\"_ _242\"> </span>24,812<span class=\"_ _1c\"> </span>10,958<span class=\"_ _64\"> </span>2,020<span class=\"_ _1c\"> </span>53,817<span class=\"_ _39c\"> </span>Underlying EBITDA<span class=\"_ _79\"> </span>6,653<span class=\"_ _242\"> </span>16,692<span class=\"_ _140\"> </span>4,998<span class=\"_ _9c\"> </span>(387)<span class=\"_ _152\"> </span>27,956<span class=\"_ _39c\"> </span>Depreciation and amortisation<span class=\"_ _82\"> </span><span class=\"ff6f\">(1,810)<span class=\"_ _13\"> </span>(1,993)<span class=\"_ _e\"> </span>(697)<span class=\"_ _e\"> </span>(561)<span class=\"_ _13\"> </span>(5,061)<span class=\"_ _39c\"> </span></span>Impairment losses<span class=\"_ _39c\"> </span>1<span class=\"_ _39c\"> </span>(33)<span class=\"_ _b5\"> </span>(28)<span class=\"_ _b0\"> </span>(6)<span class=\"_ _bc\"> </span>(8)<span class=\"_ _b5\"> </span>(75)<span class=\"_ _39c\"> </span>Underlying EBIT<span class=\"_ _ae\"> </span>4,810<span class=\"_ _1c\"> </span>14,671<span class=\"_ _64\"> </span>4,295<span class=\"_ _9c\"> </span>(956)<span class=\"_ _6b\"> </span>22,820<span class=\"_ _39c\"> </span>Exceptional items<span class=\"_ _39c\"> </span>2<span class=\"_ _39c\"> </span>471<span class=\"_ _9c\"> </span>(295)<span class=\"_ _c5\"> </span>\u2013<span class=\"_ _14f\"> </span>(64)<span class=\"_ _9c\"> </span><span class=\"ls49 ws4e\">11<span class=\"_ _43\"></span>2<span class=\"_ _39c\"> </span></span>Net finance costs<span class=\"_ _257\"> </span><span class=\"ff6f\">(1,531)<span class=\"_ _39c\"> </span></span>Profit before taxation<span class=\"_ _258\"> </span><span class=\"ff6f\">21,401<span class=\"_ _39c\"> </span></span>Capital expenditure (cash basis)<span class=\"_ _259\"> </span><span class=\"ff6f\">2,698<span class=\"_ _64\"> </span>1,966<span class=\"_ _6f\"> </span>657<span class=\"_ _64\"> </span>1,412<span class=\"_ _64\"> </span>6,733<span class=\"_ _39c\"> </span></span>Profit/(loss) from equity accounted investments,<span class=\"ff6f\"> </span>related impairments and expenses<span class=\"_ _c2\"> </span><span class=\"ff6f\">854<span class=\"_ _9c\"> </span>(256)<span class=\"_ _c5\"> </span>\u2013<span class=\"_ _55\"> </span>(4)<span class=\"_ _c8\"> </span>594<span class=\"_ _39c\"> </span></span>Investments accounted for using the equity method<span class=\"_ _fe\"> </span>1,530<span class=\"_ _74\"> </span>\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _6d\"> </span>90<span class=\"_ _64\"> </span>1,620<span class=\"_ _39c\"> </span>T<span class=\"_ _2\"></span>otal assets<span class=\"_ _25a\"> </span>40,366<span class=\"_ _242\"> </span>25,025<span class=\"_ _1a\"> </span>11,087<span class=\"_ _242\"> </span>24,818<span class=\"_ _19b\"> </span>101,296<span class=\"_ _39c\"> </span>T<span class=\"_ _2\"></span>otal liabilities<span class=\"_ _7d\"> </span>5,824<span class=\"_ _140\"> </span>8,382<span class=\"_ _64\"> </span>3,821<span class=\"_ _1c\"> </span>34,739<span class=\"_ _1c\"> </span>52,766<span class=\"_ _39c\"> </span>Y<span class=\"_ _2a\"></span>ear ended 30 June 2022 US$M <span class=\"_ _25b\"> </span>Copper<span class=\"_ _152\"> </span>Iron Ore<span class=\"_ _154\"> </span>Coal<span class=\"_ _39c\"> </span>Group and unallocated items/ eliminations<span class=\"_ _d2\"> </span>Group total<span class=\"_ _39c\"> </span>Revenue<span class=\"_ _155\"> </span>16,849<span class=\"_ _242\"> </span>30,767<span class=\"_ _1c\"> </span>15,549<span class=\"_ _140\"> </span>1,933<span class=\"_ _1c\"> </span>65,098<span class=\"_ _39c\"> </span>Inter-segment revenue<span class=\"_ _25c\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span>T<span class=\"_ _2a\"></span>otal revenue<span class=\"_ _25d\"> </span>16,849<span class=\"_ _242\"> </span>30,767<span class=\"_ _1c\"> </span>15,549<span class=\"_ _140\"> </span>1,933<span class=\"_ _1c\"> </span>65,098<span class=\"_ _39c\"> </span>Underlying EBITDA<span class=\"_ _c1\"> </span>8,565<span class=\"_ _242\"> </span>21,707<span class=\"_ _64\"> </span>9,504<span class=\"_ _6f\"> </span>858<span class=\"_ _242\"> </span>40,634<span class=\"_ _39c\"> </span>Depreciation and amortisation<span class=\"_ _82\"> </span>(1,765)<span class=\"_ _13\"> </span>(2,203)<span class=\"_ _e\"> </span>(762)<span class=\"_ _e\"> </span>(953)<span class=\"_ _13\"> </span>(5,683)<span class=\"_ _39c\"> </span>Impairment losses<span class=\"_ _39c\"> </span>1<span class=\"_ _39c\"> </span>(470)<span class=\"_ _b5\"> </span>(33)<span class=\"_ _b0\"> </span>(9)<span class=\"_ _bc\"> </span>(3)<span class=\"_ _95\"> </span>(515)<span class=\"_ _39c\"> </span>Underlying EBIT<span class=\"_ _24c\"> </span>6,330<span class=\"_ _1c\"> </span>19,471<span class=\"_ _140\"> </span>8,733<span class=\"_ _14f\"> </span>(98)<span class=\"_ _6b\"> </span>34,436<span class=\"_ _39c\"> </span>Exceptional items<span class=\"_ _39c\"> </span>2<span class=\"_ _39c\"> </span>(81)<span class=\"_ _95\"> </span>(648)<span class=\"_ _c8\"> </span>849<span class=\"_ _9c\"> </span>(450)<span class=\"_ _e\"> </span>(330)<span class=\"_ _39c\"> </span>Net finance costs<span class=\"_ _1ca\"> </span><span class=\"ff70\">(969)<span class=\"_ _39c\"> </span></span>Profit before taxation<span class=\"_ _17b\"> </span><span class=\"ff70\">33,137<span class=\"_ _39c\"> </span></span>Capital expenditure (cash basis)<span class=\"_ _25e\"> </span>2,528<span class=\"_ _64\"> </span>1,848<span class=\"_ _6f\"> </span>621<span class=\"_ _25\"> </span>858<span class=\"_ _64\"> </span>5,855<span class=\"_ _39c\"> </span>Profit/(loss) from equity accounted investments, <span class=\"ff70\"> </span>related impairments and expenses<span class=\"_ _25f\"> </span>577<span class=\"_ _9c\"> </span>(595)<span class=\"_ _b0\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span></span>(1)<span class=\"_ _10d\"> </span>(19)<span class=\"_ _39c\"> </span>Investments accounted for using the equity method<span class=\"_ _199\"> </span>1,415<span class=\"_ _c5\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _74\"> </span></span>5<span class=\"_ _140\"> </span>1,420<span class=\"_ _39c\"> </span>T<span class=\"_ _2a\"></span>otal assets<span class=\"_ _3d\"> </span>32,762<span class=\"_ _1c\"> </span>24,613<span class=\"_ _1a\"> </span>1<span class=\"_ _2\"></span>1,524<span class=\"_ _242\"> </span>26,267<span class=\"_ _1c\"> </span>95,166<span class=\"_ _39c\"> </span>T<span class=\"_ _2a\"></span>otal liabilities<span class=\"_ _141\"> </span>5,342<span class=\"_ _64\"> </span>7,790<span class=\"_ _140\"> </span>3,874<span class=\"_ _242\"> </span>29,394<span class=\"_ _1c\"> </span>46,400<span class=\"_ _39c\"> </span><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs10a\">Y<span class=\"_ _2a\"></span>ear ended 30 June 2021 </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs10b\">US$M<span class=\"_ _143\"> </span>Copper<span class=\"_ _152\"> </span>Iron Ore<span class=\"_ _154\"> </span>Coal<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs10c\">Group and </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs10d\">unallocated </div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs10e\">items/ </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs10f\">eliminations<span class=\"_ _d2\"> </span>Group total<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs110\">Revenue<span class=\"_ _155\"> </span>15,726<span class=\"_ _242\"> </span>34,475<span class=\"_ _140\"> </span>5,154<span class=\"_ _64\"> </span>1,566<span class=\"_ _1c\"> </span>56,921<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs111\">Inter-segment revenue<span class=\"_ _25c\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs112\">T<span class=\"_ _2a\"></span>otal revenue<span class=\"_ _25d\"> </span>15,726<span class=\"_ _242\"> </span>34,475<span class=\"_ _140\"> </span>5,154<span class=\"_ _64\"> </span>1,566<span class=\"_ _1c\"> </span>56,921<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs113\">Underlying EBITDA<span class=\"_ _c1\"> </span>8,489<span class=\"_ _242\"> </span>26,278<span class=\"_ _25\"> </span>288<span class=\"_ _6d\"> </span>18<span class=\"_ _242\"> </span>35,073<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs114\">Depreciation and amortisation<span class=\"_ _82\"> </span>(1,608)<span class=\"_ _13\"> </span>(1,971)<span class=\"_ _e\"> </span>(845)<span class=\"_ _e\"> </span>(660)<span class=\"_ _13\"> </span>(5,084)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs115\">Impairment losses</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs116\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs117\">(72)<span class=\"_ _b5\"> </span>(13)<span class=\"_ _10d\"> </span>(20)<span class=\"_ _10d\"> </span>(31)<span class=\"_ _95\"> </span>(136)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs118\">Underlying EBIT<span class=\"_ _24c\"> </span>6,809<span class=\"_ _1c\"> </span>24,294<span class=\"_ _9c\"> </span>(577)<span class=\"_ _e\"> </span>(673)<span class=\"_ _152\"> </span>29,853<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs119\">Exceptional items</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs11a\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs11b\">(144)<span class=\"_ _13\"> </span>(1,319)<span class=\"_ _13\"> </span>(1,567)<span class=\"_ _13\"> </span>(1,308)<span class=\"_ _13\"> </span>(4,338)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs11c\">Net finance costs<span class=\"_ _257\"> </span><span class=\"ff70\">(1,223)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs11d\">Profit before taxation<span class=\"_ _17b\"> </span><span class=\"ff70\">24,292<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs11e\">Capital expenditure (cash basis)<span class=\"_ _25e\"> </span>2,180<span class=\"_ _64\"> </span>2,188<span class=\"_ _6f\"> </span>579<span class=\"_ _25\"> </span>665<span class=\"_ _64\"> </span>5,612<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs11f\">Profit/(loss) from equity accounted investments, related impairments </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs120\">and expenses<span class=\"_ _260\"> </span>692<span class=\"_ _12a\"> </span>(1,126)<span class=\"_ _95\"> </span>(480)<span class=\"_ _b0\"> </span>(1)<span class=\"_ _e\"> </span>(915)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs121\">Investments accounted for using the equity method<span class=\"_ _199\"> </span>1,482<span class=\"_ _c5\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _6f\"> </span></span>260<span class=\"_ _64\"> </span>1,742<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs122\">T<span class=\"_ _2a\"></span>otal assets</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs123\">3<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs124\">31,517<span class=\"_ _242\"> </span>26,171<span class=\"_ _206\"> </span>1<span class=\"_ _2\"></span>1,030<span class=\"_ _242\"> </span>40,209<span class=\"_ _e7\"> </span>108,927<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs125\">T<span class=\"_ _2a\"></span>otal liabilities</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs126\">3<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs127\">4,589<span class=\"_ _64\"> </span>7,508<span class=\"_ _64\"> </span>3,518<span class=\"_ _1c\"> </span>37,707<span class=\"_ _1c\"> </span>53,322<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs128\">1 <span class=\"_ _42\"> </span>Impairment losses exclude exceptional items of US$ nil (2022: US$ nil; 2021: US$2,371 million).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs129\">2 <span class=\"_ _42\"> </span>Exceptional items reported in Copper and Group and unallocated include fair value changes on Samarco related forward exchange derivatives of US$471 million (2022: </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs12a\">US$(81) million; 2021: US$136 million), Samarco dam failure costs of US$(64) million (2022: US$(13) million; 2021: US$(14) million), and Samarco related other income of </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs12b\">US$ nil (2022: US$ nil ; 2021: US$34 million). Refer to note 3 \u2018Exceptional items\u2019 for further information.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs12c\">3 <span class=\"_ _42\"> </span>Group and unallocated FY2021 total assets and total liabilities include Petroleum assets and liabilities that were disclosed as part of the Petroleum segment before the </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs12d\">merger of the Group\u2019s oil and gas portfolio with Woodside Energy Group Ltd (\u2018W<span class=\"_ _2\"></span>oodside\u2019) in FY2022. </div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs12e\">Geographical information<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs12f\">Revenue by location of customer<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs130\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs131\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs132\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs133\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs134\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs135\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs136\">Australia<span class=\"_ _232\"> </span><span class=\"ff6f\">1,702<span class=\"_ _64\"> </span></span>1,649<span class=\"_ _64\"> </span>1,871<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs137\">Europe<span class=\"_ _261\"> </span><span class=\"ff6f\">1,961<span class=\"_ _64\"> </span></span>2,129<span class=\"_ _6f\"> </span>886<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs138\">China<span class=\"_ _262\"> </span><span class=\"ff6f\">31,205<span class=\"_ _242\"> </span></span>36,618<span class=\"_ _1c\"> </span>39,653<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs139\">Japan<span class=\"_ _22e\"> </span><span class=\"ff6f\">6,971<span class=\"_ _64\"> </span></span>8,401<span class=\"_ _64\"> </span>4,387<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs13a\">India<span class=\"_ _263\"> </span><span class=\"ff6f\">3,447<span class=\"_ _64\"> </span></span>5,215<span class=\"_ _64\"> </span>2,189<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs13b\">South Korea<span class=\"_ _264\"> </span><span class=\"ff6f\">2,997<span class=\"_ _64\"> </span></span>4,786<span class=\"_ _64\"> </span>3,420<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 wsbd gs13c\">Rest <span class=\"_ _0\"></span>of Asia<span class=\"_ _265\"> </span><span class=\"ff6f ws2\">3,583<span class=\"_ _64\"> </span><span class=\"ff70\">4,303<span class=\"_ _64\"> </span>2,934<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 wsbd gs13d\">North America<span class=\"_ _1f5\"> </span><span class=\"ff6f ws2\">1,382<span class=\"_ _64\"> </span><span class=\"ff70\">1,282<span class=\"_ _64\"> </span>1,147<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 wsbd gs13e\">South America<span class=\"_ _129\"> </span><span class=\"ff6f ws2\">569<span class=\"_ _25\"> </span><span class=\"ff70\">715<span class=\"_ _25\"> </span>426<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs13f\">Rest of world<span class=\"_ _232\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _74\"> </span></span></span>8<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs140\">53,817<span class=\"_ _242\"> </span><span class=\"ff70\">65,098<span class=\"_ _1c\"> </span>56,921<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs141\">Non-current assets by location of assets<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs142\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs143\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs144\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs145\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs146\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs147\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs148\">Australia<span class=\"_ _266\"> </span><span class=\"ff6f\">51,961<span class=\"_ _242\"> </span></span>43,250<span class=\"_ _1c\"> </span>48,612<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 wsbd gs149\">North America<span class=\"_ _1f5\"> </span><span class=\"ff6f ws2\">5,081<span class=\"_ _64\"> </span><span class=\"ff70\">3,964<span class=\"_ _64\"> </span>9,701<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 wsbd gs14a\">South America<span class=\"_ _267\"> </span><span class=\"ff6f ws2\">19,047<span class=\"_ _242\"> </span><span class=\"ff70\">18,280<span class=\"_ _1c\"> </span>18,548<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs14b\">Rest of world<span class=\"_ _be\"> </span><span class=\"ff6f\">685<span class=\"_ _6f\"> </span></span>150<span class=\"_ _64\"> </span>1,851<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs14c\">Unallocated assets</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs14d\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs14e\">1,171<span class=\"_ _25\"> </span><span class=\"ff70\">858<span class=\"_ _140\"> </span>3,522<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs14f\">77,945<span class=\"_ _242\"> </span><span class=\"ff70\">66,502<span class=\"_ _1c\"> </span>82,234<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs150\">1 <span class=\"_ _42\"> </span>Unallocated assets comprise deferred tax assets and other financial assets.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs151\">Underlying EBITDA<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs152\">Underlying EBITDA<span class=\"_ _2\"></span> is earnings before net finance costs, depreciation, amortisation and impairments, taxation expense, Discontinued operations and any </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs153\">exceptional items. Underlying EBITDA<span class=\"_ _2\"></span> includes BHP\u2019s share of profit/(loss) from investments accounted for using the equity method including net finance </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs154\">costs, depreciation, amortisation and impairments and taxation expense/(benefit). </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs155\">Exceptional items are excluded from Underlying EBITDA<span class=\"_ _2\"></span> in order to enhance the comparability of such measures from period-to-period and provide </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs156\">investors with further clarity in order to assess the performance of the Group\u2019s operations. Management monitors exceptional items separately<span class=\"_ _2a\"></span>. Refer to </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs157\">note 3 \u2018Exceptional items\u2019<span class=\"_ _2\"></span> for additional detail.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs158\">Segment assets and liabilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs159\">T<span class=\"_ _2a\"></span>otal segment assets and liabilities of reportable segments represents operating assets and operating liabilities, including the carrying amount of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs15a\">equity accounted investments and predominantly excludes cash balances, loans to associates, interest bearing liabilities and deferred tax balances. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs15b\">The carrying value of investments accounted for using the equity method represents the balance of the Group\u2019s investment in equity accounted </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs15c\">investments, with no adjustment for any cash balances, interest bearing liabilities or deferred tax balances of the equity accounted investment.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff6f fs7 fc7 sc0 ls5 ws121 gs15e\">2 Revenue<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs15f\">Revenue by segment and asset<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs160\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs161\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs162\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs163\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs164\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs165\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs166\">Escondida<span class=\"_ _268\"> </span><span class=\"ff6f\">8,847<span class=\"_ _64\"> </span></span>9,500<span class=\"_ _64\"> </span>9,470<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs167\">Pampa Norte<span class=\"_ _12d\"> </span><span class=\"ff6f\">2,491<span class=\"_ _1ff\"> </span></span>2,670<span class=\"_ _140\"> </span>1,801<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 wsbd gs168\">Copper <span class=\"_ _0\"></span>South Australia<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs169\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs16a\">2,806<span class=\"_ _64\"> </span><span class=\"ff70\">1,776<span class=\"_ _8f\"> </span>2,21<span class=\"_ _2\"></span>1<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs16b\">Third-party products<span class=\"_ _269\"> </span><span class=\"ff6f\">1,863<span class=\"_ _64\"> </span></span>2,903<span class=\"_ _64\"> </span>2,244<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs16c\">Other<span class=\"_ _16d\"> </span><span class=\"ff6f\">20<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs16d\">T<span class=\"_ _2\"></span>otal Copper<span class=\"_ _39c\"> </span></div><div class=\"t m0 h138 ff6f fs21 fc3 sc0 ls5 ws2 gs16e\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs16f\">16,027<span class=\"_ _242\"> </span><span class=\"ff70\">16,849<span class=\"_ _1c\"> </span>15,726<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs170\">Western <span class=\"_ _2\"></span>Australia Iron Ore<span class=\"_ _26a\"> </span><span class=\"ff6f\">24,678<span class=\"_ _242\"> </span></span>30,632<span class=\"_ _1c\"> </span>34,337<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs171\">Third-party products<span class=\"_ _162\"> </span><span class=\"ff6f\">21<span class=\"_ _6d\"> </span></span>19<span class=\"_ _a\"> </span>18<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs172\">Other<span class=\"_ _26b\"> </span><span class=\"ff6f ls49 ws4e\">11<span class=\"_ _0\"></span>3<span class=\"_ _1fb\"> </span></span><span class=\"lsd3 ws102\">11<span class=\"_ _43\"></span>6<span class=\"_ _eb\"> </span></span>120<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs173\">T<span class=\"_ _2\"></span>otal Iron Ore<span class=\"_ _267\"> </span>24,812<span class=\"_ _1c\"> </span><span class=\"ff70\">30,767<span class=\"_ _242\"> </span>34,475<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 wsbd gs174\">BHP <span class=\"_ _0\"></span>Mitsubishi Alliance<span class=\"_ _bd\"> </span><span class=\"ff6f ws2\">7,652<span class=\"_ _1c\"> </span><span class=\"ff70\">10,254<span class=\"_ _64\"> </span>3,537<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs175\">New South W<span class=\"_ _2\"></span>ales Energy Coal<span class=\"_ _1ee\"> </span><span class=\"ff6f\">3,306<span class=\"_ _1ff\"> </span></span>3,035<span class=\"_ _6f\"> </span>839<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs176\">Other</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs177\">3<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs178\">\u2013<span class=\"_ _64\"> </span><span class=\"ff70\">2,260<span class=\"_ _6f\"> </span>778<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs179\">T<span class=\"_ _2\"></span>otal Coal</div><div class=\"t m0 h138 ff6f fs21 fc3 sc0 ls5 ws2 gs17a\">4<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs17b\">10,958<span class=\"_ _242\"> </span><span class=\"ff70\">15,549<span class=\"_ _140\"> </span>5,154<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs17c\">Group and unallocated items</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs17d\">5<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs17e\">2,020<span class=\"_ _64\"> </span><span class=\"ff70\">1,933<span class=\"_ _64\"> </span>1,566<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs17f\">Inter-segment adjustment<span class=\"_ _26c\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs180\">T<span class=\"_ _2\"></span>otal revenue<span class=\"_ _26d\"> </span>53,817<span class=\"_ _242\"> </span><span class=\"ff70\">65,098<span class=\"_ _1c\"> </span>56,921<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs181\">1 <span class=\"_ _42\"> </span>Includes Olympic Dam as well as Prominent Hill and Carrapateena since acquisition on 2 May 2023 as part of the acquisition of OZ Minerals Ltd (OZL).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs182\">2 <span class=\"_ _42\"> </span>T<span class=\"_ _2a\"></span>otal Copper revenue includes: copper US$14,902 million (2022: US$15,992 million; 2021: US$14,812 million) and other US$1,125 million </div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs183\">(2022: US$857 million; 2021: US$914 million). Other consists of silver<span class=\"_ _2\"></span>, zinc, molybdenum, uranium and gold.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs184\">3 <span class=\"_ _42\"> </span>Comparative periods include revenue related to BHP Mitsui Coal (BMC) divested in May 2022.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs185\">4 <span class=\"_ _42\"> </span>T<span class=\"_ _2a\"></span>otal Coal revenue includes: metallurgical coal US$7,430 million (2022: US$1<span class=\"_ _2\"></span>1,990 million; 2021: US$4,260 million) and energy coal US$3,528 million (2022: </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs186\">US$3,559 million; 2021: US$894 million). </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs187\">5 <span class=\"_ _42\"> </span>Group and unallocated items revenue includes: Nickel West US$2,009 million (2022: US$1,926 million; 2021: US$1,545 million) and other revenue US$1<span class=\"_ _2\"></span>1 million </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs188\">(2022: US$7 million; 2021: US$21 million).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs189\">Revenue consists of revenue from contracts with customers of US$53,910 million (2022: US$65,504 million; 2021: US$55,562 million) and other </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs18a\">revenue predominantly relating to provisionally priced sales of US$(93) million (2022: US$(406) million; 2021: US$1,359 million).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs18b\">Recognition and measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs18c\">The Group generates revenue from the production and sale of commodities. Revenue is recognised when or as control of the promised goods or services </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs18d\">passes to the customer<span class=\"_ _2\"></span>. In most instances, control passes when the goods are delivered to a destination specified by the customer<span class=\"_ _2\"></span>, typically on board </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs18e\">the customer<span class=\"_ _0\"></span>\u2019s appointed vessel. Revenue from the provision of services is recognised over time as the services are provided, but does not represent a </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs18f\">significant proportion of total revenue and is aggregated with the respective asset and product revenue for disclosure purposes. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs190\">The amount of revenue recognised reflects the consideration to which the Group expects to be entitled in exchange for transferring goods or services. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs191\">Where the Group\u2019s sales are provisionally priced, the final price depends on future index prices. The amount of revenue initially recognised is based on </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs192\">the relevant forward market price. <span class=\"_ _2\"></span>Adjustments between the provisional and final price are accounted for under IFRS 9/AASB 9 \u2018Financial Instruments\u2019<span class=\"_ _2\"></span> </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs193\">(IFRS 9), separately recorded as other revenue and presented as part of the total revenue of each asset. The period between provisional pricing and </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs194\">final invoicing is typically between 60 and 120 days.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs195\">Revenue from the sale of significant by-products is included within revenue. Where a by-product is not significant, revenue is credited against costs. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs196\">The Group applies the following practical expedients:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs197\">\u2013  <span class=\"ff70\">expected consideration is not adjusted for the effects of the time value of money if the period between the delivery and when the customer pays for the </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs198\">promised good or service is one year or less<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs199\">\u2013  no disclosure is provided for information relating to unfulfilled performance obligations, either due to the expected duration of the contract term being </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs19a\">one year or less, or for longer term contracts, because the entity has a right to consideration (and can recognise revenue) for goods delivered<span class=\"_ _39c\"> </span> </div><div class=\"t m0 hb ff72 fs7 fc7 sc0 ls5 ws2 gs19c\">3 <span class=\"_ _47\"> </span>Exceptional items<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs19d\">Exceptional items are those gains or losses where their nature, including the expected frequency of the events giving rise to them, and impact is </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs19e\">considered material to the Financial Statements. Such items included within the Group\u2019s profit from Continuing operations for the year are detailed below<span class=\"_ _2\"></span>. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs19f\">Exceptional items attributable to Discontinued operations are detailed in note 28 \u2018Discontinued operations\u2019. </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs1a0\">Y<span class=\"_ _2\"></span>ear ended 30 June 2023<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs1a1\">Gross <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs1a2\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff72 fs3 fc3 sc0 ls5 ws2 gs1a3\">T<span class=\"_ _2\"></span>ax <span class=\"_ _2\"></span><span class=\"ff6f\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs1a4\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs1a5\">Net <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs1a6\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff72 fs2 fc3 sc0 ls5 ws2 gs1a7\">Exceptional items by category<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1a8\">Samarco dam failure<span class=\"_ _26e\"> </span><span class=\"ff6f\">(340)<span class=\"_ _bb\"> </span>17<span class=\"_ _9c\"> </span>(323)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1a9\">Chilean tax reform<span class=\"_ _245\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _c8\"> </span>(283)<span class=\"_ _e\"> </span>(283)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs1aa\">T<span class=\"_ _2\"></span>otal<span class=\"_ _26f\"> </span>(340)<span class=\"_ _95\"> </span>(266)<span class=\"_ _e\"> </span>(606)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1ab\">Attributable to non-controlling interests<span class=\"_ _9f\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _9c\"> </span>(107)<span class=\"_ _95\"> </span>(107)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1ac\">Attributable to BHP shareholders<span class=\"_ _270\"> </span><span class=\"ff6f\">(340)<span class=\"_ _95\"> </span>(159)<span class=\"_ _e\"> </span>(499)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs1ad\">Samarco Minera\u00e7\u00e3o S.A. (Samarco) dam failure<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1ae\">The loss of US$323 million (after tax) relates to the Samarco dam failure, which occurred in November 2015, and comprises the following:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs1af\">Y<span class=\"_ _2\"></span>ear ended 30 June 2023<span class=\"_ _271\"> </span>US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1b0\">Other income<span class=\"_ _272\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs1b1\">Expenses excluding net finance costs:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1b2\">Costs incurred directly by BHP Brasil and other BHP entities in relation to the Samarco dam failure<span class=\"_ _18c\"> </span><span class=\"ff6f\">(103)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs1b3\">Profit/(loss) from equity accounted investments, related impairments and expenses:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1b4\">Samarco dam failure provision<span class=\"_ _273\"> </span><span class=\"ff6f\">(256)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1b5\">Fair value change on forward exchange derivatives<span class=\"_ _12c\"> </span><span class=\"ff6f\">471<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs1b6\">Net finance costs<span class=\"_ _1ca\"> </span><span class=\"ff6f\">(452)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs1b7\">Income tax benefit<span class=\"_ _274\"> </span><span class=\"ff6f\">17<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs1b8\">T<span class=\"_ _2\"></span>otal</div><div class=\"t m0 h138 ff6f fs21 fc3 sc0 ls5 ws2 gs1b9\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs1ba\">(323)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs1bb\">1 <span class=\"_ _42\"> </span>Refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 for further information. </div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs1bc\">Chilean tax reform<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1bd\">On 17 May 2023, the Chilean Lower House approved a Royalty Bill which will implement a 1 per cent royalty on revenues, a margin based tax with rates </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1be\">ranging between 8 per cent and 26 per cent, and a 46.5 per cent cap to the overall Chilean tax burden of mining companies. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1bf\">The President of the Lower House formally declared the legislative process complete on 12 June 2023, following receipt of the Chilean President\u2019s formal </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs1c0\">confirmation that he had waived his veto power to oppose any of the provisions of the Royalty Bill. On 13 July 2023, the Constitutional Court finalised its </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1c1\">review of certain aspects of the Royalty Bill, relating only to the distribution of proceeds. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1c2\">Applying judgement, it was determined that the proposed tax rates were substantively enacted prior to 30 June 2023, as the scope of the Constitutional </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1c3\">Court review did not extend to reviewing the tax rates.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1c4\">While the timing of when the Group\u2019s operations will be impacted by the reform depends on existing stability agreements, relevant deferred tax positions </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs1c5\">have been remeasured by US$283 million in the Group\u2019s FY2023 financial statements.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1c6\">The exceptional items relating to the years ended 30 June 2022 and 30 June 2021 are detailed below<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs1c7\">30 June 2022<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs1c8\">Y<span class=\"_ _2a\"></span>ear ended 30 June 2022 </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs1c9\">Gross <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs1ca\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs1cb\">T<span class=\"_ _2a\"></span>ax <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs1cc\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs1cd\">Net <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs1ce\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff72 fs2 fc3 sc0 ls5 ws2 gs1cf\">Exceptional items by category<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1d0\">Samarco dam failure<span class=\"_ _275\"> </span>(1,032)<span class=\"_ _b5\"> </span>(31)<span class=\"_ _98\"> </span>(1,063)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs1d1\">Impairment of US deferred tax assets<span class=\"_ _23f\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _9c\"> </span></span>(423)<span class=\"_ _95\"> </span>(423)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs1d2\">Corporate structure unification costs<span class=\"_ _161\"> </span><span class=\"ff70\">(428)<span class=\"_ _b0\"> </span></span> \u2212<span class=\"_ _9c\"> </span><span class=\"ff70\">(428)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs1d3\">BHP Mitsui Coal (BMC) gain on disposal<span class=\"_ _276\"> </span>840<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _25\"> </span></span>840<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1d4\">T<span class=\"_ _2a\"></span>otal<span class=\"_ _277\"> </span>(620)<span class=\"_ _95\"> </span>(454)<span class=\"_ _98\"> </span>(1,074)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs1d5\">Attributable to non-controlling interests<span class=\"_ _160\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1d6\">Attributable to BHP shareholders<span class=\"_ _270\"> </span>(620)<span class=\"_ _95\"> </span>(454)<span class=\"_ _98\"> </span>(1,074)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs1d7\">Samarco Minera\u00e7\u00e3o S.A. (Samarco) dam failure<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1d8\">The loss of US$1,063 million related to the Samarco dam failure, which occurred in November 2015, and comprises the following:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs1d9\">Y<span class=\"_ _2a\"></span>ear ended 30 June 2022<span class=\"_ _258\"> </span>US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs1da\">Other income<span class=\"_ _278\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs1db\">Expenses excluding net finance costs:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1dc\">Costs incurred directly by BHP Brasil and other BHP entities in relation to the Samarco dam failure<span class=\"_ _279\"> </span>(66)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs1dd\">Profit/(loss) from equity accounted investments, related impairments and expenses:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs1de\">Samarco impairment expense <span class=\"_ _27a\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1df\">Samarco dam failure provision<span class=\"_ _273\"> </span>(595)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1e0\">Fair value change on forward exchange derivatives<span class=\"_ _12e\"> </span>(81)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs1e1\">Net finance costs<span class=\"_ _1ca\"> </span><span class=\"ff70\">(290)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1e2\">Income tax expense<span class=\"_ _1ce\"> </span>(31)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1e3\">T<span class=\"_ _2a\"></span>otal<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs1e4\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1e5\">(1,063)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs1e6\">1 <span class=\"_ _42\"> </span>Refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 for further information.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs1e8\">Impairment of US deferred tax assets </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1e9\">The Group recognised an impairment charge of US$423 million (after tax) in relation to deferred tax assets where the recoverability had historically been </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1ea\">reliant on Petroleum earnings in the same tax group. While these tax assets remained with the Group following the merger of the Group\u2019s oil and gas </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs1eb\">portfolio with Woodside, the impairment charge reflected the extent of other forecasted future earnings against which the assets can be recovered. </div><div class=\"t m0 h9 ff71 fs5 fc2 sc0 ls5 ws2 gs1ec\">Corporate structure unification costs<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs1ed\">The Group incurred transaction costs associated with the unification of the Group corporate structure under its existing <span class=\"_ _2\"></span>Australian parent company<span class=\"_ _2\"></span>, BHP<span class=\"_ _2\"></span> </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1ee\">Group Limited, which was completed on 31 January 2022. </div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs1ef\">BHP Mitsui Coal (BMC) gain on disposal<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1f0\">On 3 May 2022 the Group sold its 80 per cent interest in BHP Mitsui Coal Pty Ltd (BMC) to Stanmore SMC Holdings Pty Ltd, a wholly owned subsidiary </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1f1\">of Stanmore Resources Limited (Stanmore Resources). </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1f2\">Stanmore Resources paid US$1.1 billion cash consideration at completion plus a preliminary completion adjustment of US$218 million for working capital. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1f3\">Deferred consideration of US$222 million comprised US$100 million in cash, outstanding at 30 June 2022 and subsequently received on 3 November </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1f4\">2022, with potential for an additional amount of up to US$150 million (US$122 million discounted) in a price-linked earnout payable in the 2024 </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1f5\">calendar year<span class=\"_ _2\"></span>. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs1f6\">Details of the gain on disposal is as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs1f7\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1f8\">BHP share of net assets disposed<span class=\"_ _27b\"> </span>631<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1f9\">Gross consideration<span class=\"_ _27c\"> </span>1,318<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1fa\">T<span class=\"_ _2\"></span>ransaction and other directly applicable costs<span class=\"_ _27d\"> </span>(69)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs1fb\">Income tax expense<span class=\"_ _27e\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1fc\">Deferred consideration<span class=\"_ _27f\"> </span>222<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs1fd\">Gain on disposal<span class=\"_ _1d1\"> </span>840<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs1fe\">30 June 2021<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs1ff\">Y<span class=\"_ _2a\"></span>ear ended 30 June 2021<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs200\">Gross </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs201\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 lse2 ws122 gs202\">Ta<span class=\"_ _43\"></span>x<span class=\"_ _43\"></span><span class=\"ls5 ws2\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs203\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs204\">Net </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs205\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff72 fs2 fc3 sc0 ls5 ws2 gs206\">Exceptional items by category<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs207\">Samarco dam failure<span class=\"_ _275\"> </span>(1,087)<span class=\"_ _b5\"> </span>(71)<span class=\"_ _98\"> </span>(1,158)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs208\">COVID-19 related costs<span class=\"_ _280\"> </span>(499)<span class=\"_ _c8\"> </span>138<span class=\"_ _9c\"> </span>(361)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs209\">Impairment of Energy coal assets<span class=\"_ _9f\"> </span>(1,523)<span class=\"_ _95\"> </span>(651)<span class=\"_ _13\"> </span>(2,174)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs20a\">Impairment of Potash assets<span class=\"_ _281\"> </span>(1,314)<span class=\"_ _95\"> </span>(473)<span class=\"_ _98\"> </span>(1,787)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs20b\">T<span class=\"_ _2a\"></span>otal<span class=\"_ _282\"> </span>(4,423)<span class=\"_ _13\"> </span>(1,057)<span class=\"_ _13\"> </span>(5,480)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs20c\">Attributable to non-controlling interests<span class=\"_ _283\"> </span>(34)<span class=\"_ _bb\"> </span>10<span class=\"_ _61\"> </span>(24)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs20d\">Attributable to BHP shareholders<span class=\"_ _23f\"> </span>(4,389)<span class=\"_ _98\"> </span>(1,067)<span class=\"_ _13\"> </span>(5,456)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs20e\">Samarco Minera\u00e7\u00e3o S.A. (Samarco) dam failure<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs20f\">The loss of US$1,158 million related to the Samarco dam failure, which occurred in November 2015, and comprises the following:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs210\">Y<span class=\"_ _2a\"></span>ear ended 30 June 2021<span class=\"_ _258\"> </span>US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs211\">Other income<span class=\"_ _284\"> </span>34<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs212\">Expenses excluding net finance costs:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs213\">Costs incurred directly by BHP Brasil and other BHP entities in relation to the Samarco dam failure<span class=\"_ _279\"> </span>(46)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs214\">Profit/(loss) from equity accounted investments, related impairments and expenses:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs215\">Samarco impairment expense <span class=\"_ _285\"> </span><span class=\"lsd3 ws102\">(<span class=\"_ _0\"></span>111<span class=\"_ _43\"></span>)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs216\">Samarco dam failure provision<span class=\"_ _286\"> </span>(1,015)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs217\">Fair value change on forward exchange derivatives<span class=\"_ _12c\"> </span>136<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs218\">Net finance costs<span class=\"_ _1d1\"> </span><span class=\"ff70\">(85)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs219\">Income tax expense<span class=\"_ _1ce\"> </span>(71)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs21a\">T<span class=\"_ _2a\"></span>otal</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs21b\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs21c\">(1,158)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs21d\">1 <span class=\"_ _42\"> </span>Refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 for further information. </div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs21e\">COVID-19 related costs<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs21f\">The exceptional item reflects the directly attributable COVID-19 pandemic related additional costs for the Group for FY2021, including costs associated </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs220\">with the increased provision of health and hygiene services, the impacts of maintaining social distancing requirements and demurrage and other standby </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs221\">charges related to delays caused by COVID-19. <span class=\"_ _2\"></span>At the time, COVID-19 was considered a single protracted globally pervasive event. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs222\">However<span class=\"_ _2\"></span>, as the pandemic has continued to evolve, certain impacts that were initially considered to be potentially short-term in nature are now expected </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs223\">to continue over a number of reporting periods. These activities are now considered to be part of business as usual operations and, as such, from FY2022 </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs224\">any incremental costs have not been classified as an exceptional item.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs225\">Impairment of Energy coal assets<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs226\">The Group recognised an impairment charge of US$1,704 million (after tax) in relation to New South Wales Energy Coal (NSWEC) reflecting the status </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs227\">of the divestment process and current market conditions for thermal coal, the strengthening <span class=\"_ _2\"></span>Australian dollar and changes to the mine plan. In addition, </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs228\">the Group recognised an impairment charge of US$470 million (after tax) for Cerrej\u00f3n, reflecting the expected net sales proceeds. </div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs229\">Impairment of Potash assets<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs22a\">The Group recognised an impairment charge of US$1,787 million (after tax) in relation to Potash. The impairment charge reflected an analysis of market </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs22b\">perspectives and the value that we expected a market participant to attribute to our investments to date. </div><div class=\"t m0 hb ff72 fs7 fc7 sc0 ls5 ws2 gs22d\">4 <span class=\"_ _47\"> </span>Significant events \u2013 Samarco dam failure<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs22e\">On 5 November 2015, the Samarco Minera\u00e7\u00e3o S.A. (Samarco) iron ore operation in Minas Gerais, Brazil, experienced a tailings dam failure that resulted </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs22f\">in a release of mine tailings, flooding the communities of Bento Rodrigues, Gesteira and Paracatu and impacting other communities downstream (the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs230\">Samarco dam failure). Refer to section on \u2018Samarco\u2019<span class=\"_ _2\"></span> in the Operating and Financial Review<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs231\">Samarco is jointly owned by BHP Billiton Brasil Ltda (BHP<span class=\"_ _2\"></span> Brasil) and V<span class=\"_ _2\"></span>ale S.A. (V<span class=\"_ _2\"></span>ale). BHP<span class=\"_ _2\"></span> Brasil\u2019s 50 per cent interest is accounted for as an equity </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs232\">accounted joint venture investment. BHP Brasil does not separately recognise its share of the underlying assets and liabilities of Samarco, but instead </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs233\">records the investment as one line on the balance sheet. Each period, BHP Brasil recognised its 50 per cent share of Samarco\u2019s profit or loss and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs234\">adjusted the carrying value of the investment in Samarco accordingly<span class=\"_ _2\"></span>. Such adjustment continued until the investment carrying value was reduced to US$ </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs235\">nil, with any additional share of Samarco losses only recognised to the extent that BHP Brasil has an obligation to fund the losses. <span class=\"_ _2\"></span>After applying equity </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs236\">accounting, any remaining carrying value of the investment is tested for impairment. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs237\">Any charges relating to the Samarco dam failure incurred directly by BHP Brasil or other BHP entities are recognised 100 per cent in the Group\u2019<span class=\"_ _2\"></span>s results.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs238\">The financial impacts of the Samarco dam failure on the Group\u2019s income statement, balance sheet and cash flow statement for the year ended 30 June </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs239\">2023 are shown in the tables below and have been treated as an exceptional item. </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs23a\">Financial impacts of Samarco dam failure </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs23b\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs23c\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs23d\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs23e\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs23f\">2021 </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs240\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs241\">Income statement </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs242\">Other income</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs243\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff6f fs2 fc3 sc0 ls5 ws2 gs244\">\u2013<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _6d\"> </span><span class=\"ff70\">34<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs245\">Expenses excluding net finance costs:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs246\">Costs incurred directly by BHP Brasil and other BHP entities in relation to the Samarco dam failure</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs247\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs248\">(103)<span class=\"_ _b5\"> </span><span class=\"ff70\">(66)<span class=\"_ _10d\"> </span>(46)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs249\">Profit/(loss) from equity accounted investments, related impairments and expenses:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs24a\">Samarco impairment expense</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs24b\">3<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff6f fs2 fc3 sc0 ls5 ws2 gs24c\">\u2013<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _1fe\"> </span><span class=\"ff70 lsd3 ws102\">(<span class=\"_ _43\"></span>111<span class=\"_ _0\"></span>)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs24d\">Samarco dam failure provision<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs24e\">4<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs24f\">(256)<span class=\"_ _95\"> </span><span class=\"ff70\">(595)<span class=\"_ _98\"> </span>(1,015)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs250\">Fair value change on forward exchange derivatives</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs251\">5<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs252\">471<span class=\"_ _14f\"> </span><span class=\"ff70\">(81)<span class=\"_ _c8\"> </span>136<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs253\">Profit/(loss) from operations<span class=\"_ _287\"> </span><span class=\"ff6f ls49 ws4e\">11<span class=\"_ _0\"></span>2<span class=\"_ _1b\"> </span></span><span class=\"ff70\">(742)<span class=\"_ _13\"> </span>(1,002)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs254\">Net finance costs</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs255\">6<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs256\">(452)<span class=\"_ _95\"> </span><span class=\"ff70\">(290)<span class=\"_ _10d\"> </span>(85)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs257\">Loss before taxation<span class=\"_ _23b\"> </span><span class=\"ff6f\">(340)<span class=\"_ _13\"> </span></span>(1,032)<span class=\"_ _13\"> </span>(1,087)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs258\">Income tax benefit/(expense)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs259\">7<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs25a\">17<span class=\"_ _14f\"> </span><span class=\"ff70\">(31)<span class=\"_ _10d\"> </span>(71)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs25b\">Loss after taxation<span class=\"_ _288\"> </span><span class=\"ff6f\">(323)<span class=\"_ _13\"> </span><span class=\"ff70\">(1,063)<span class=\"_ _13\"> </span>(1,158)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs25c\">Balance sheet movement<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs25d\">T<span class=\"_ _2\"></span>rade and other payables <span class=\"_ _289\"> </span><span class=\"ff6f\">(6)<span class=\"_ _b0\"> </span></span>(1)<span class=\"_ _b0\"> </span>(5)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs25e\">Derivatives<span class=\"_ _167\"> </span><span class=\"ff6f\">337<span class=\"_ _9c\"> </span></span>(160)<span class=\"_ _c8\"> </span>136<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs25f\">T<span class=\"_ _2a\"></span>ax liabilities<span class=\"_ _28a\"> </span><span class=\"ff6f\">17<span class=\"_ _14f\"> </span></span>(31)<span class=\"_ _10d\"> </span>(71)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs260\">Provisions<span class=\"_ _167\"> </span><span class=\"ff6f\">(260)<span class=\"_ _e\"> </span></span>(629)<span class=\"_ _e\"> </span>(741)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs261\">Net decrease/(increase) in liabilities<span class=\"_ _28b\"> </span>88<span class=\"_ _9c\"> </span><span class=\"ff70\">(821)<span class=\"_ _95\"> </span>(681)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs262\">2023 </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs263\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs264\">2022 </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs265\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs266\">2021 </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs267\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff72 fs2 fc3 sc0 ls5 ws2 gs268\">Cash flow statement </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs269\">Loss before taxation<span class=\"_ _28c\"> </span><span class=\"ff6f\">(340)<span class=\"_ _18\"> </span></span>(1,032)<span class=\"_ _18\"> </span>(1,087)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h45 ff73 fs2 fc3 sc0 ls5 ws2 gs26a\">Adjustments for:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs26b\">Samarco impairment expense</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs26c\">3<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff6f fs2 fc3 sc0 ls5 ws2 gs26d\">\u2013<span class=\"_ _108\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _28d\"> </span><span class=\"ff70 lsd3 ws102\">111<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs26e\">Samarco dam failure provision</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs26f\">4<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs270\">256<span class=\"_ _28e\"> </span><span class=\"ff70\">595<span class=\"_ _1b1\"> </span>1,015<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs271\">Fair value change on forward exchange derivatives</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs272\">5<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs273\">(471)<span class=\"_ _28d\"> </span><span class=\"ff70\">81<span class=\"_ _28f\"> </span>(136)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs274\">Proceeds of cash management related instruments<span class=\"_ _a5\"> </span><span class=\"ff6f\">134<span class=\"_ _290\"> </span></span>79<span class=\"_ _d9\"> </span><span class=\"ff71\">\u2013<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs275\">Net finance costs</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs276\">6<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs277\">452<span class=\"_ _28e\"> </span><span class=\"ff70\">290<span class=\"_ _aa\"> </span>85<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h45 ff73 fs2 fc3 sc0 ls5 ws2 gs278\">Changes in assets and liabilities:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs279\">T<span class=\"_ _2\"></span>rade and other payables<span class=\"_ _18c\"> </span><span class=\"ff6f\">6<span class=\"_ _d9\"> </span></span>1<span class=\"_ _d9\"> </span>5<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs27a\">Net operating cash flows<span class=\"_ _291\"> </span><span class=\"ff6f\">37<span class=\"_ _aa\"> </span><span class=\"ff70\">14<span class=\"_ _292\"> </span>(7)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs27b\">Net investment and funding of equity accounted investments</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs27c\">8<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs27d\">(448)<span class=\"_ _1e3\"> </span><span class=\"ff70\">(256)<span class=\"_ _137\"> </span>(470)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs27e\">Net investing cash flows<span class=\"_ _293\"> </span><span class=\"ff6f\">(448)<span class=\"_ _1e3\"> </span><span class=\"ff70\">(256)<span class=\"_ _137\"> </span>(470)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs27f\">Net decrease in cash and cash equivalents<span class=\"_ _252\"> </span>(41<span class=\"_ _2\"></span>1)<span class=\"_ _137\"> </span><span class=\"ff70\">(242)<span class=\"_ _1e3\"> </span>(477)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs280\">1 <span class=\"_ _42\"> </span>Proceeds from insurance settlements.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs281\">2 <span class=\"_ _42\"> </span>Includes legal and advisor costs incurred.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs282\">3 <span class=\"_ _42\"> </span>Impairment expense from working capital funding provided during the period. </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs283\">4 <span class=\"_ _42\"> </span>US$(33) million (2022: US$691 million; 2021: US$836 million) change in estimate and US$289 million (2022: US$(96) million; 2021: US$179 million) exchange translation.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs284\">5 <span class=\"_ _42\"> </span>The Group enters into forward exchange contracts to limit the Brazilian reais exposure on the dam failure provision. While not applying hedge accounting, the fair </div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs285\">value changes in the forward exchange instruments are recorded within Profit/(loss) from equity accounted investments, related impairments and expenses in the </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs286\">Income Statement.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs287\">6 <span class=\"_ _42\"> </span>Amortisation of discounting of provision.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs288\">7 <span class=\"_ _42\"> </span>Includes tax on forward exchange derivatives and other taxes incurred during the period.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs289\">8 <span class=\"_ _42\"> </span>Includes US$ nil (2022: US$ nil; 2021: US$(1<span class=\"_ _2\"></span>1<span class=\"_ _2\"></span>1) million) funding provided during the period and US$(448) million (2022: US$(256) million; 2021: US$(359) million) </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs28a\">utilisation of the Samarco dam failure provision. </div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs28b\">Equity accounted investment in Samarco<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs28c\">BHP Brasil\u2019<span class=\"_ _2\"></span>s investment in Samarco remains at US$ nil. No dividends have been received by BHP Brasil from Samarco during the period and Samarco </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs28d\">currently does not have profits available for distribution.<span class=\"_ _39c\"> </span> </div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs28f\">Provision related to the Samarco dam failure<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs290\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs291\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs292\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs293\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs294\">At the beginning of the financial year<span class=\"_ _192\"> </span><span class=\"ff6f\">3,421<span class=\"_ _28e\"> </span><span class=\"ff70\">2,792<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs295\">Movement in provision<span class=\"_ _294\"> </span><span class=\"ff6f\">260<span class=\"_ _108\"> </span></span>629<span class=\"_ _39c\"> </span></div><div class=\"t m0 h45 ff73 fs2 fc3 sc0 ls5 ws2 gs296\">Comprising:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs297\">Utilised<span class=\"_ _280\"> </span><span class=\"ff6f\">(448)<span class=\"_ _124\"> </span></span>(256)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs298\">Adjustments charged to the income statement:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs299\">Change in cost estimate <span class=\"_ _180\"> </span><span class=\"ff6f\">(33)<span class=\"_ _153\"> </span></span>691<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs29a\">Amortisation of discounting impacting net finance costs<span class=\"_ _228\"> </span><span class=\"ff6f\">452<span class=\"_ _108\"> </span><span class=\"ff70\">290<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs29b\">Exchange translation<span class=\"_ _295\"> </span><span class=\"ff6f\">289<span class=\"_ _d9\"> </span></span>(96)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs29c\">At the end of the financial year<span class=\"_ _176\"> </span><span class=\"ff6f\">3,681<span class=\"_ _14\"> </span><span class=\"ff70\">3,421<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs29d\">Comprising:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs29e\">Current<span class=\"_ _167\"> </span><span class=\"ff6f\">1,876<span class=\"_ _14\"> </span></span>1,815<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs29f\">Non-current<span class=\"_ _296\"> </span><span class=\"ff6f\">1,805<span class=\"_ _28e\"> </span></span>1,606<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs2a0\">At the end of the financial year<span class=\"_ _176\"> </span><span class=\"ff6f\">3,681<span class=\"_ _14\"> </span><span class=\"ff70\">3,421<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs2a1\">Samarco dam failure provision and contingencies </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs2a2\">As at 30 June 2023, BHP Brasil has identified a provision and certain contingent liabilities arising as a consequence of the Samarco dam failure. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs2a3\">The provision only reflects the future cost estimates associated with the delivery of programs set out in the Framework <span class=\"_ _2\"></span>Agreement (see below). </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs2a4\">Contingent liabilities will only be resolved when one or more uncertain future events occur or related impacts become capable of reliable measurement </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs2a5\">and, as such, determination of contingent liabilities disclosed in the financial statements requires significant judgement regarding the outcome of </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs2a6\">future events. <span class=\"_ _2\"></span>A<span class=\"_ _2\"></span> number of the claims below do not specify the amount of damages sought and, where this is specified, amounts could change as the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs2a7\">matter progresses. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs2a8\">Ultimately<span class=\"_ _2\"></span>, future changes in all those matters for which a provision has been recognised or contingent liability disclosed could have a material adverse </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs2a9\">impact on BHP\u2019s business, competitive position, cash flows, prospects, liquidity and shareholder returns.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs2aa\">The following table summarises the current status of significant ongoing matters relating to the Samarco dam failure, along with developments during the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs2ab\">financial year<span class=\"_ _2\"></span>, and the associated treatment in the Financial Statements: </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls43 ws48 gs2ac\">Item<span class=\"_ _27f\"> </span><span class=\"ls5 ws2\">Provision<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs2ad\">Contingent </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs2ae\">liability<span class=\"_ _39c\"> </span></div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls1c ws21 gs2af\">Samarco dam <span class=\"_ _2\"></span>failure <span class=\"_ _2\"></span>\u2013 Framework <span class=\"_ _2a\"></span>Agreement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls95 wsab gs2b0\">On 2 March 2016, <span class=\"_ _2\"></span>BHP Brasil, Samarco and <span class=\"_ _2\"></span>V<span class=\"_ _2\"></span>ale entered into a <span class=\"_ _2\"></span>Framework <span class=\"_ _2\"></span>Agreement with the Federal Government <span class=\"_ _2\"></span>of Brazil, the states </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2b1\">of Espirito Santo and Minas Gerais, and certain other public authorities to establish a foundation (Funda\u00e7\u00e3o Renova) that is developing </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2b2\">and executing environmental and socio-economic programs (Programs) to remediate and provide compensation for damage caused by the </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2b3\">Samarco dam failure (the Framework <span class=\"_ _2\"></span>Agreement). </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls95 wsab gs2b4\">Key programs include those <span class=\"_ _2\"></span>for financial assistance and compensation of <span class=\"_ _2\"></span>impacted persons and those for <span class=\"_ _2\"></span>remediation of impacted areas and </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2b5\">resettlement of impacted communities. </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2b6\">Samarco has primary responsibility for funding Funda\u00e7\u00e3o Renova with each of BHP Brasil and V<span class=\"_ _2a\"></span>ale having secondary funding obligations </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2b7\">in proportion to their 50 per cent shareholding in Samarco. While Samarco has recommenced operations, Samarco\u2019s long-term cash </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs2b8\">flow generation remains highly sensitive to factors including returning to full production capacity<span class=\"_ _2\"></span>, commodity prices and foreign exchange </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2b9\">rates. Further<span class=\"_ _2\"></span>, under the proposed resolution to the Samarco Judicial Reorganisation (refer to Samarco Judicial Reorganisation below), </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2ba\">Samarco\u2019s funding of Funda\u00e7\u00e3o Renova would be capped at US$1 billion for the period CY2024 to CY2030.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls4a ws51 gs2bb\">Given the <span class=\"_ _2\"></span>proposed Samarco <span class=\"_ _2\"></span>funding <span class=\"_ _2\"></span>cap and <span class=\"_ _2\"></span>uncertainty associated <span class=\"_ _2\"></span>with Samarco\u2019<span class=\"_ _2\"></span>s long-term <span class=\"_ _2\"></span>cash flow <span class=\"_ _2\"></span>generation, BHP <span class=\"_ _2\"></span>Brasil <span class=\"_ _2\"></span>has recognised <span class=\"_ _2\"></span>a<span class=\"_ _0\"></span> </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls4a ws51 gs2bc\">provision reflecting <span class=\"_ _2\"></span>the Group\u2019<span class=\"_ _2\"></span>s current <span class=\"_ _2\"></span>best estimate <span class=\"_ _2\"></span>of the <span class=\"_ _2\"></span>costs <span class=\"_ _2\"></span>to be <span class=\"_ _2\"></span>incurred in <span class=\"_ _2\"></span>completing the <span class=\"_ _2\"></span>Programs under <span class=\"_ _2\"></span>the Framework <span class=\"_ _2a\"></span>Agreement.<span class=\"_ _0\"></span> <span class=\"_ _2\"></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2bd\">Uncertainty exists around the scope and cost of the programs, including as a result of ongoing legal actions in relation to the number </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs2be\">of individuals eligible for compensation and the amount of damages to which they are entitled. Further<span class=\"_ _2\"></span>, the provision reflects only the </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2bf\">estimated cost of completing the Programs as the Group is unable to provide a range of possible outcomes or a reliable estimate of other </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2c0\">existing or future claims (as outlined below).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls1c ws21 gs2c1\">Federal Public <span class=\"_ _2\"></span>Prosecution <span class=\"_ _2\"></span>Office claim<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs2c2\">BHP Brasil is among the defendants named in a claim brought by the Federal Public Prosecution Office on 3 May 2016, seeking R$155 </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2c3\">billion (approximately US$32 billion) for reparation, compensation and moral damages in relation to the Samarco dam failure. </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs2c4\">Under a Governance <span class=\"_ _2\"></span>Agreement ratified on 8 <span class=\"_ _2\"></span>August 2018, BHP Brasil, Samarco and V<span class=\"_ _2a\"></span>ale were to establish a process to renegotiate the </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2c5\">Programs over two years with the Federal and State prosecutors to progress settlement of this claim. The Federal Public Prosecution </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs2c6\">Office claim was suspended from the date of ratification of the Governance <span class=\"_ _2\"></span>Agreement and, although the suspension period has formally </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2c7\">elapsed, no material development has occurred.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2c8\">Since early CY2021, the parties have been engaging in negotiations to seek a settlement of obligations under the Framework <span class=\"_ _2\"></span>Agreement </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs2c9\">and Federal Public Prosecution Office claim. Outcomes of the negotiations are highly uncertain, and it is therefore not possible to provide </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2ca\">a reliable estimate of potential outcomes and there is a risk that a negotiated outcome may be materially higher than the cost estimates of </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2cb\">delivering the programs under the Framework <span class=\"_ _2\"></span>Agreement. </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2cc\">BHP Brasil, Samarco and V<span class=\"_ _2a\"></span>ale maintain security<span class=\"_ _2\"></span>, as required by the Governance <span class=\"_ _2\"></span>Agreement, with the security currently comprising </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2cd\">insurance bonds and a charge over certain Samarco assets. </div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls1c ws21 gs2ce\">Australian class <span class=\"_ _2\"></span>action <span class=\"_ _2\"></span>complaint<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls95 wsab gs2cf\">BHP Group <span class=\"_ _2\"></span>Limited is named as a defendant <span class=\"_ _2\"></span>in a shareholder class action filed <span class=\"_ _2\"></span>in the Federal Court of <span class=\"_ _2a\"></span>Australia on behalf of persons who </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2d0\">acquired shares in BHP Group Limited on the <span class=\"_ _2\"></span>Australian Securities Exchange (ASX) or shares in BHP Group Plc (now BHP<span class=\"_ _2\"></span> Group (UK) Ltd) </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2d1\">on the London Stock Exchange (LSE) and Johannesburg Stock Exchange (JSE) in periods prior to the Samarco dam failure. </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls4a ws51 gs2d2\">The amount <span class=\"_ _2\"></span>of damages <span class=\"_ _2\"></span>sought <span class=\"_ _2\"></span>is unspecified. </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls43 ws48 gs2d4\">Item<span class=\"_ _27f\"> </span><span class=\"ls5 ws2\">Provision<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs2d5\">Contingent </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs2d6\">liability<span class=\"_ _39c\"> </span></div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls1c ws21 gs2d7\">United Kingdom <span class=\"_ _2\"></span>group <span class=\"_ _2\"></span>action complaint<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls95 wsab gs2d8\">BHP Group <span class=\"_ _2\"></span>(UK) Ltd (formerly BHP <span class=\"_ _2\"></span>Group Plc) and BHP <span class=\"_ _2\"></span>Group Limited are named as defendants <span class=\"_ _2\"></span>in group action claims for <span class=\"_ _2\"></span>damages filed in </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls95 wsab gs2d9\">the courts of England. <span class=\"_ _2\"></span>These claims were filed <span class=\"_ _2\"></span>on behalf of certain individuals, governments, <span class=\"_ _2\"></span>businesses and communities in Brazil <span class=\"_ _2\"></span>allegedly </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2da\">impacted by the Samarco dam failure. </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls95 wsab gs2db\">The amount of damages <span class=\"_ _2\"></span>sought in these claims is unspecified. <span class=\"_ _2a\"></span>A <span class=\"_ _2\"></span>trial in relation to BHP\u2019<span class=\"_ _2\"></span>s liability for the dam <span class=\"_ _2\"></span>failure is listed for October 2024.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls95 wsab gs2dc\">In December 2022, the <span class=\"_ _2\"></span>BHP defendants filed their <span class=\"_ _2\"></span>defence and a contribution claim against <span class=\"_ _2\"></span>V<span class=\"_ _2\"></span>ale. The <span class=\"_ _2\"></span>contribution claims contends that if </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2dd\">BHP\u2019s defence is not successful and the BHP<span class=\"_ _2\"></span> defendants are ordered to pay damages to the claimants, V<span class=\"_ _2\"></span>ale should contribute to any amount </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2de\">payable. V<span class=\"_ _2\"></span>ale contested the jurisdiction of the English courts to determine this contribution claim, with the court dismissing V<span class=\"_ _2a\"></span>ale\u2019s application </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2df\">on 7 <span class=\"_ _2\"></span>August 2023. Subject to the outcome of any appeals by V<span class=\"_ _2\"></span>ale in relation to jurisdiction and directions from the Court, the contribution </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2e0\">claim will proceed in the UK. </div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls1c ws21 gs2e1\">Criminal charges<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls95 wsab gs2e2\">The Federal <span class=\"_ _2\"></span>Prosecutors\u2019 Office <span class=\"_ _2\"></span>has filed criminal charges against BHP<span class=\"_ _2\"></span> Brasil, Samarco and <span class=\"_ _2\"></span>V<span class=\"_ _2\"></span>ale and certain employees <span class=\"_ _2\"></span>and former </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2e3\">employees of BHP Brasil (Af<span class=\"_ _2\"></span>fected Individuals) in the Federal Court of Ponte Nova, Minas Gerais. </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2e4\">BHP Brasil rejects outright the charges against the company and the <span class=\"_ _2\"></span>Affected Individuals and is defending itself from all charges while fully </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2e5\">supporting each of the <span class=\"_ _2\"></span>Affected Individuals in their defence of the charges. </div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls1c ws21 gs2e6\">Civil public <span class=\"_ _2\"></span>action <span class=\"_ _2\"></span>commenced by <span class=\"_ _2a\"></span>Associations concerning the <span class=\"_ _2\"></span>use <span class=\"_ _2\"></span>of T<span class=\"_ _2a\"></span>ANFLOC for <span class=\"_ _2\"></span>water treatment<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2e7\">The V<span class=\"_ _2\"></span>ila Lenira Residents <span class=\"_ _2\"></span>Association, State of Espirito Santo Rural Producers and <span class=\"_ _2\"></span>Artisans Association, Colatina V<span class=\"_ _2a\"></span>elha Neighbourhood<span class=\"_ _0\"></span> </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls95 wsab gs2e8\">Residents <span class=\"_ _2\"></span>Association, and United <span class=\"_ _2\"></span>for the Progress of Palmeiras Neighbourhood <span class=\"_ _2a\"></span>Association have filed a lawsuit against <span class=\"_ _2\"></span>Samarco, BHP </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2e9\">Brasil and V<span class=\"_ _2\"></span>ale and others, including the State of Minas Gerais, the State of Espirito Santo and the Federal Government. </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls95 wsab gs2ea\">The plaintiffs <span class=\"_ _2\"></span>allege that the defendants carried out <span class=\"_ _2\"></span>a clandestine study on the citizens <span class=\"_ _2\"></span>of the locations af<span class=\"_ _2\"></span>fected by the Fund\u00e3o Dam Failure, </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls95 wsab gs2eb\">using T<span class=\"_ _2a\"></span>ANFLOC \u2013 a tannin-based flocculant/coagulant \u2013 <span class=\"_ _2\"></span>that is currently used for <span class=\"_ _2\"></span>wastewater treatment applications. The <span class=\"_ _2\"></span>plaintiffs claim that </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2ec\">this product allegedly put the population at risk due to its alleged experimental qualities. </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls95 wsab gs2ed\">The plaintiffs <span class=\"_ _2\"></span>are seeking multiple kinds of relief <span class=\"_ _2\"></span>\u2013 material damages, moral damages, loss <span class=\"_ _2\"></span>of profits \u2013 and that <span class=\"_ _2\"></span>the defendants should pay for </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2ee\">water supply in all locations where there is no water source other than the Doce River<span class=\"_ _2\"></span>. </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls95 ws2 gs2ef\">The defendants have presented their defences and the Court\u2019s decision is still pending. </div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls1c ws21 gs2f0\">Other claims<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2f1\">BHP<span class=\"_ _2\"></span> Brasil is among the companies named as defendants in a number of legal proceedings initiated by individuals, non-governmental </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs2f2\">organisations, corporations and governmental entities in Brazilian Federal and State courts following the Samarco dam failure. The other </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2f3\">defendants include V<span class=\"_ _2\"></span>ale, Samarco and Funda\u00e7\u00e3o Renova.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs2f4\">The lawsuits include claims for compensation, environmental reparation and violations of Brazilian environmental and other laws, among </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2f5\">other matters. The lawsuits seek various remedies including reparation costs, compensation to injured individuals and families of the </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2f6\">deceased, recovery of personal and property losses, moral damages and injunctive relief. </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2f7\">In addition, government inquiries and investigations relating to the Samarco dam failure have been commenced by numerous agencies of </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs2f8\">the Brazilian government and are ongoing. </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs2f9\">Additional lawsuits and government investigations relating to the Samarco dam failure could be brought against BHP Brasil and other BHP </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs2fa\">entities in Brazil or other jurisdictions.<span class=\"_ _39c\"> </span> </div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs2fc\">Commitments </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs2fd\">Under the terms of the Samarco joint venture agreement, BHP Brasil does </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs2fe\">not have an existing obligation to fund Samarco. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs2ff\">However<span class=\"_ _2\"></span>, BHP Brasil has agreed to fund a total of up to US$915 million for </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs300\">the Funda\u00e7\u00e3o Renova programs during calendar year 2023. <span class=\"_ _2\"></span>Any additional </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs301\">requests for funding or future investment provided would be subject to a </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs302\">future decision by BHP Brasil, accounted for at that time.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff72 fs11 fc3 sc0 ls5 ws2 gs303\">Samarco judicial reorganisation<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs304\">Samarco filed for Judicial Reorganisation (JR) in <span class=\"_ _2\"></span>April 2021, with the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs305\">Second Business State Court for the Belo Horizonte District of Minas </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs306\">Gerais, State of Minas Gerais, Brazil (JR Court), after multiple enforcement </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs307\">actions taken by certain financial creditors of Samarco which threatened </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs308\">Samarco\u2019s operations. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs309\">The JR is an insolvency proceeding that provides a means for Samarco </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs30a\">to seek to restructure its financial debts and establish a stable financial </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs30b\">position that allows Samarco to continue to rebuild its operations </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs30c\">and strengthen its ability to meet its Funda\u00e7\u00e3o Renova related </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs30d\">funding obligations. Samarco\u2019s operations have continued during the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs30e\">JR proceeding.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs30f\">On 31 May 2023, Samarco, BHP Brasil and V<span class=\"_ _2a\"></span>ale entered into a </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs310\">Restructuring Support <span class=\"_ _2\"></span>Agreement (RSA) with certain Samarco financial </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs311\">creditors. The RSA<span class=\"_ _2\"></span> outlines the proposed parameters for a restructure </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs312\">of Samarco\u2019s financial debts, to be implemented through a consensual </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs313\">judicial reorganisation plan (Consensual Plan), subject to approval by the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs314\">creditors of Samarco and ratification by the JR Court. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs315\">On 28 July 2023, Samarco and one of the financial creditors jointly filed </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs316\">the Consensual Plan with the JR Court, that aims at implementing and is </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs317\">consistent with the transactions contemplated in the RSA. Concurrent with </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs318\">the filing of the Consensual Plan, the parties also filed terms of adhesion </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs319\">that demonstrate approval of the Consensual Plan by the majority of </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs31a\">Samarco\u2019s creditors as required under Brazilian Bankruptcy Law<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs31b\">Once ratified by the JR Court and confirmed by the United States </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs31c\">Bankruptcy Court for the Southern District of New Y<span class=\"_ _2a\"></span>ork, the Samarco debt </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs31d\">restructure, including payments to Samarco employees and suppliers as </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs31e\">stipulated in the Plan and the issuance of new debt instruments to financial </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs31f\">creditors is expected to be executed in the first half of FY2024.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs320\">The proposed terms of the Plan are not expected to impact Funda\u00e7\u00e3o </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs321\">Renova\u2019s ability to undertake the remediation and compensation </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs322\">Programs. Samarco\u2019s funding of Renova is proposed to be capped at </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs323\">US$1 billion for the period CY2024 to CY2030. BHP Brasil has considered </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs324\">this proposed cap, along with Samarco\u2019s long-term forecast cash flows, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs325\">when determining the dam failure related provision at 30 June 2023. </div><div class=\"t m0 h1f ff72 fs11 fc3 sc0 ls5 ws2 gs326\">Key judgements and estimates<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff6f fs5 fc3 sc0 ls5 ws2 gs327\">Judgements:<span class=\"ff71\"> The outcomes of litigation are inherently difficult to </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs328\">predict and significant judgement has been applied in assessing the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs329\">likely outcome of legal claims and determining which legal claims </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs32a\">require recognition of a provision or disclosure of a contingent liability<span class=\"_ _2\"></span>. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs32b\">The facts and circumstances relating to these cases are regularly </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs32c\">evaluated in determining whether a provision for any specific claim </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs32d\">is required. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs32e\">Management has determined that a provision can only be recognised </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs32f\">for obligations under the Framework <span class=\"_ _2\"></span>Agreement as at 30 June 2023. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs330\">It is not yet possible to provide a range of possible outcomes or a </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs331\">reliable estimate of potential future exposures to BHP in connection to </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs332\">the contingent liabilities noted above, given their status.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff6f fs5 fc3 sc0 ls5 ws2 gs333\">Estimates:<span class=\"ff71\"> The provision for the Samarco dam failure reflects the </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs334\">Group\u2019s estimate of the remaining costs to complete Programs </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs335\">under the Framework <span class=\"_ _2\"></span>Agreement and requires the use of significant </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs336\">judgements, estimates and assumptions. Based on current estimates, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs337\">it is expected that approximately 85 per cent of remaining costs for </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs338\">Programs under the Framework <span class=\"_ _2\"></span>Agreement will be incurred by June </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs339\">2025, largely attributable to the finalisation of the resettlement program </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs33a\">and closure of the Novel system (application system for impacted </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs33b\">individuals to lodge compensation claims).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs33c\">While the provision has been measured based on the latest information </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs33d\">available as at 30 June 2023, changes in facts and circumstances are </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs33e\">likely in future reporting periods and may lead to material revisions </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs33f\">to these estimates. However<span class=\"_ _2\"></span>, it is currently not possible to determine </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs340\">what facts and circumstances may change, therefore revisions in future </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs341\">reporting periods due to the key estimates and factors outlined below </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs342\">cannot be reliably measured. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs343\">The key estimates that may have a material impact upon the provision </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs344\">in the next and future reporting periods include the:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs345\">\u2013  number of people eligible for financial assistance and compensation </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs346\">and the corresponding amount of expected compensation; and<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs347\">\u2013  <span class=\"ff70\">costs to complete key infrastructure programs. </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs348\">The provision may also be affected by factors including but not </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs349\">limited to: </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs34a\">\u2013  <span class=\"ff70\">potential changes in scope of work and funding amounts required </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs34b\">under the Framework <span class=\"_ _2\"></span>Agreement including the impact of further </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs34c\">technical analysis, community participation required under the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs34d\">Governance <span class=\"_ _2\"></span>Agreement and rulings made by the Federal Court;<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs34e\">\u2013  <span class=\"ff70\">the outcome of ongoing negotiations with State and Federal </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs34f\">Prosecutors, including review of Funda\u00e7\u00e3o Renova\u2019s Programs as </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs350\">provided in the Governance <span class=\"_ _2\"></span>Agreement;<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs351\">\u2013  <span class=\"ff70\">actual costs incurred;<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs352\">\u2013  <span class=\"ff70\">updates to discount and foreign exchange rates; and<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs353\">\u2013  <span class=\"ff70\">the outcomes of Samarco\u2019s judicial reorganisation and resolution </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs354\">of uncertainty in respect of the nature and extent of Samarco\u2019s </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs355\">long-term cash generation. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs356\">In addition, the provision may be impacted by decisions in, or resolution </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs357\">of, existing and potential legal claims in Brazil and other jurisdictions, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs358\">including the outcome of the United Kingdom group action and the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs359\">negotiations seeking a definitive and substantive settlement of the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs35a\">obligations under the Framework <span class=\"_ _2\"></span>Agreement and the R$155 billion </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs35b\">(approximately US$32 billion) Federal Public Prosecution Office claim.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs35c\">Outcomes of the negotiations are highly uncertain and it is therefore not </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs35d\">possible to provide a reliable estimate of potential outcomes. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs35e\">Given these factors, future actual cash outflows may differ from the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs35f\">amounts currently provided and changes to any of the key assumptions </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs360\">and estimates outlined above could result in a material impact to the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs361\">provision in the next and future reporting periods.<span class=\"_ _39c\"> </span> </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls1c ws21 gs363\">The following <span class=\"_ _2\"></span>section <span class=\"_ _2\"></span>includes disclosure <span class=\"_ _2\"></span>of amounts <span class=\"_ _2\"></span>recognised or <span class=\"_ _2\"></span>disclosed <span class=\"_ _2\"></span>by Samarco <span class=\"_ _2\"></span>in its <span class=\"_ _2\"></span>financial statements <span class=\"_ _2\"></span>for <span class=\"_ _2\"></span>matters to <span class=\"_ _2\"></span>which Samarco <span class=\"_ _2\"></span>(and not <span class=\"_ _2\"></span>the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls1c ws2 gs364\">Group) is a party<span class=\"_ _2\"></span>. </div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs365\">Samarco<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs366\">Dam failure related provision and contingencies<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls1c ws2 gs367\">In addition to its obligations under the Framework <span class=\"_ _2\"></span>Agreement as at 30 June </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls1c ws2 gs368\">2023, Samarco has recognised a provision of US$0.4 billion (30 June 2022: </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs369\">US$0.3 billion), based on currently available information. The magnitude, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs36a\">scope and timing of these additional costs are subject to a high degree of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls1c ws2 gs36b\">uncertainty and Samarco has indicated that it anticipates that it will incur future </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls6 ws2 gs36c\">costs beyond those provided. These uncertainties are likely to continue for a </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls6 ws5 gs36d\">significant period <span class=\"_ _2\"></span>and changes to <span class=\"_ _2\"></span>key assumptions <span class=\"_ _2\"></span>could result in <span class=\"_ _2\"></span>a material </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls6 ws2 gs36e\">change to the amount of the provision in future reporting periods. <span class=\"_ _2\"></span>Any such </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls6 ws2 gs36f\">unrecognised obligations are therefore contingent liabilities and, at present, it </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls6 ws2 gs370\">is not practicable to estimate their magnitude or possible timing of payment. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs371\">Accordingly<span class=\"_ _2\"></span>, it is also not possible to provide a range of possible outcomes </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs372\">or a reliable estimate of total potential future exposures at this time.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls1c ws2 gs373\">Samarco is also named as a defendant in a number of other legal proceedings </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs374\">initiated by individuals, non-governmental organisations, corporations </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs375\">and governmental entities in <span class=\"_ _2\"></span>Brazilian Federal and State courts <span class=\"_ _2\"></span>following </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs376\">the Samarco dam failure. The lawsuits include claims for compensation, </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls1c ws21 gs377\">environmental rehabilitation <span class=\"_ _2\"></span>and <span class=\"_ _2\"></span>violations of <span class=\"_ _2\"></span>Brazilian <span class=\"_ _2\"></span>environmental and <span class=\"_ _2\"></span>other </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs378\">laws, among other matters. The lawsuits seek various remedies including </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs379\">rehabilitation costs, compensation to injured individuals and families of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs37a\">the deceased, recovery of personal and property losses, moral damages </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs37b\">and injunctive relief. In addition, government inquiries and investigations </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs37c\">relating to the Samarco dam failure have been commenced by numerous </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs37d\">agencies of the Brazilian <span class=\"_ _2\"></span>government and are ongoing. Given <span class=\"_ _2\"></span>the status of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs37e\">proceedings it is not possible to provide a range of possible outcomes or a </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs37f\">reliable estimate of total potential future exposures to Samarco.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls6 ws2 gs380\">Additional lawsuits and government investigations relating to the Samarco </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls6 ws2 gs381\">dam failure could be brought against Samarco.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs382\">Samarco insurance<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs383\">Samarco has standalone insurance policies in place with Brazilian </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs384\">and global insurers. Insurers\u2019<span class=\"_ _2\"></span> loss adjusters or claims representatives </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs385\">continue to investigate and assist with the claims process for matters not </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs386\">yet settled. <span class=\"_ _2\"></span>As at 30 June 2023, an insurance receivable has not been </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs387\">recognised by Samarco in respect of ongoing matters.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs388\">Samarco commitments<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs389\">At 30 June 2023, Samarco has commitments of US$1.0 billion (30 June </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs38a\">2022: US$0.7 billion). Following the dam failure, Samarco invoked force </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs38b\">majeure clauses in a number of long-term contracts with suppliers and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs38c\">service providers to suspend contractual obligations.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs38d\">Samarco non-dam failure related provisions and </div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs38e\">contingent liabilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs38f\">The following non-dam failure related matters pre-date and are unrelated </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs390\">to the Samarco dam failure. Samarco is currently contesting both of </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs391\">these matters in the Brazilian courts. Given the status of these tax </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs392\">matters, the timing of resolution and potential economic outflow for </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs393\">Samarco is uncertain. </div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls5 ws2 gs394\">Brazilian Social Contribution Levy </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs395\">Samarco has received tax assessments for the alleged non-payment </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs396\">of Brazilian Social Contribution Levy for the calendar years 2007-<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs397\">2014. Based on its assessment of currently available information as at </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs398\">30 June 2023, Samarco recognised gross provisions of US$1.1 billion, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs399\">US$0.9 billion net of US$0.2 billion court deposits paid (30 June 2022: </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs39a\">nil) and disclosed contingent liabilities of US$0.2 billion (30 June 2022: </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs39b\">US $1.2 billion). <span class=\"_ _2\"></span>As at 30 June 2023, BHP Brasil\u2019<span class=\"_ _2\"></span>s 50% share of the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs39c\">impact of the provision recognised by Samarco is reflected in the Group\u2019s </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs39d\">equity accounting for Samarco.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls5 ws2 gs39e\">Brazilian corporate income tax rate </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs39f\">Samarco has received tax assessments, and disclosed contingent </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs3a0\">liabilities, for alleged incorrect calculation of Corporate Income T<span class=\"_ _50\"></span>ax </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs3a1\">(IRPJ) in respect of the 2000-2003 and 2007-2014 income years totalling </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs3a2\">approximately US$1.1 billion (30 June 2022: US$0.9 billion).<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff72 fs7 fc7 sc0 ls5 ws2 gs3a3\">5 <span class=\"_ _47\"> </span>Expenses and other income<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs3a4\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs3a5\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3a6\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3a7\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3a8\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3a9\">US$M </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs3aa\">Employee benefits expense:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3ab\">W<span class=\"_ _2\"></span>ages and salaries<span class=\"_ _275\"> </span><span class=\"ff6f\">4,539<span class=\"_ _64\"> </span></span>4,197<span class=\"_ _64\"> </span>4,018<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3ac\">Employee share awards<span class=\"_ _13d\"> </span><span class=\"ff6f\">97<span class=\"_ _25\"> </span></span>109<span class=\"_ _a\"> </span>88<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3ad\">Social security costs<span class=\"_ _297\"> </span><span class=\"ff6f\">4<span class=\"_ _74\"> </span></span>4<span class=\"_ _74\"> </span>3<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3ae\">Pension and other post-retirement obligations<span class=\"_ _195\"> </span><span class=\"ff6f\">339<span class=\"_ _6f\"> </span></span>338<span class=\"_ _25\"> </span>274<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs3af\">Less employee benefits expense classified as exploration and evaluation expenditure<span class=\"_ _1ba\"> </span><span class=\"ff6f\">(35)<span class=\"_ _b5\"> </span><span class=\"ff70\">(30)<span class=\"_ _10d\"> </span>(26)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs3b0\">Changes in inventories of finished goods and work in progress<span class=\"_ _298\"> </span><span class=\"ff6f\">301<span class=\"_ _9c\"> </span><span class=\"ff70\">(774)<span class=\"_ _95\"> </span>(321)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3b1\">Raw materials and consumables used<span class=\"_ _299\"> </span><span class=\"ff6f\">6,710<span class=\"_ _64\"> </span></span>5,991<span class=\"_ _64\"> </span>4,899<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3b2\">Freight and transportation<span class=\"_ _1f9\"> </span><span class=\"ff6f\">2,299<span class=\"_ _64\"> </span></span>2,319<span class=\"_ _64\"> </span>1,900<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3b3\">External services <span class=\"_ _297\"> </span><span class=\"ff6f\">4,768<span class=\"_ _140\"> </span></span>4,525<span class=\"_ _64\"> </span>4,640<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3b4\">Third-party commodity purchases<span class=\"_ _194\"> </span><span class=\"ff6f\">1,878<span class=\"_ _64\"> </span></span>2,959<span class=\"_ _140\"> </span>2,220<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs3b5\">Net foreign exchange (gains)/losses<span class=\"_ _160\"> </span><span class=\"ff6f\">(197)<span class=\"_ _e\"> </span><span class=\"ff70\">(326)<span class=\"_ _c8\"> </span>293<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3b6\">Fair value change on derivatives</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs3b7\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs3b8\">135<span class=\"_ _14f\"> </span><span class=\"ff70\">(29)<span class=\"_ _14f\"> </span>87<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3b9\">Government royalties paid and payable<span class=\"_ _29a\"> </span><span class=\"ff6f\">3,841<span class=\"_ _64\"> </span></span>4,014<span class=\"_ _64\"> </span>3,080<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3ba\">Exploration and evaluation expenditure incurred and expensed in the current period<span class=\"_ _29b\"> </span><span class=\"ff6f\">294<span class=\"_ _25\"> </span></span>199<span class=\"_ _6f\"> </span>134<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3bb\">Depreciation and amortisation expense<span class=\"_ _29c\"> </span><span class=\"ff6f\">5,061<span class=\"_ _64\"> </span></span>5,683<span class=\"_ _64\"> </span>5,084<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3bc\">Net impairments:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3bd\">Property<span class=\"_ _2\"></span>, plant and equipment<span class=\"_ _12f\"> </span><span class=\"ff6f\">73<span class=\"_ _25\"> </span></span>515<span class=\"_ _64\"> </span>2,474<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs3be\">Goodwill and other intangible assets<span class=\"_ _23f\"> </span><span class=\"ff6f\">2<span class=\"_ _c5\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _6d\"> </span></span></span>33<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3bf\">All other operating expenses<span class=\"_ _29d\"> </span><span class=\"ff6f\">1,764<span class=\"_ _64\"> </span></span>2,677<span class=\"_ _64\"> </span>1,991<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs3c0\">T<span class=\"_ _2\"></span>otal expenses<span class=\"_ _12e\"> </span><span class=\"ff6f\">31,873<span class=\"_ _1c\"> </span><span class=\"ff70\">32,371<span class=\"_ _1c\"> </span>30,871<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3c1\">Insurance recoveries<span class=\"_ _29e\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _55\"> </span></span>(4)<span class=\"_ _10d\"> </span>(46)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs3c2\">(Gain)/loss on disposal of subsidiaries and operations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs3c3\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs3c4\">(8)<span class=\"_ _95\"> </span><span class=\"ff70\">(840)<span class=\"_ _c5\"> </span>2<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3c5\">Dividend income</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs3c6\">3<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs3c7\">(19)<span class=\"_ _95\"> </span><span class=\"ff70\">(241)<span class=\"_ _b0\"> </span>(2)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3c8\">Other income</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs3c9\">4<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs3ca\">(367)<span class=\"_ _95\"> </span><span class=\"ff70\">(313)<span class=\"_ _e\"> </span>(334)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs3cb\">T<span class=\"_ _2\"></span>otal other income<span class=\"_ _288\"> </span>(394)<span class=\"_ _13\"> </span><span class=\"ff70\">(1,398)<span class=\"_ _e\"> </span>(380)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3cc\">1 <span class=\"_ _42\"> </span>Fair value change on derivatives is principally related to commodity price contracts, foreign exchange contracts and embedded derivatives used in the ordinary course of </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3cd\">business as well as derivatives used as part of the funding of dividends.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3ce\">2 <span class=\"_ _42\"> </span>Mainly relates to the divestment of BMC in FY2022. Refer to note 3 \u2018Exceptional items\u2019 for further information.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3cf\">3 <span class=\"_ _42\"> </span>During FY2022, the Group received dividends of US$238 million from Cerrej\u00f3n, which reduced completion proceeds net of transaction costs to US$50 million. </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3d0\">On 1<span class=\"_ _2\"></span>1 January 2022, BHP completed the sale of its 33.33 per cent interest in Cerrej\u00f3n to joint venture partner<span class=\"_ _2\"></span>, Glencore plc.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3d1\">4 <span class=\"_ _42\"> </span>Other income is generally income earned from transactions outside the course of the Group\u2019s ordinary activities and may include certain management fees from </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3d2\">non-controlling interests and joint arrangements, royalties and commission income. </div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs3d4\">Recognition and measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs3d5\">Other income is recognised when it is probable that the economic benefits associated with a transaction will flow to the Group and can be reliably </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs3d6\">measured. Dividend income is recognised upon declaration. </div><div class=\"t m0 hb ff72 fs7 fc7 sc0 ls5 ws2 gs3d7\">6 <span class=\"_ _47\"> </span>Income tax expense<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs3d8\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs3d9\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3da\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3db\">US$M </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3dc\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3dd\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff72 fs2 fc3 sc0 ls5 ws2 gs3de\">T<span class=\"_ _2\"></span>otal taxation expense comprises:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3df\">Current tax expense<span class=\"_ _29f\"> </span><span class=\"ff6f\">6,690<span class=\"_ _242\"> </span></span>10,673<span class=\"_ _140\"> </span>9,018<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3e0\">Deferred tax expense<span class=\"_ _26e\"> </span><span class=\"ff6f\">387<span class=\"_ _a\"> </span></span>64<span class=\"_ _64\"> </span>1,598<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs3e1\">T<span class=\"_ _2\"></span>otal taxation expense<span class=\"_ _2a0\"> </span><span class=\"ff6f\">7,077<span class=\"_ _242\"> </span><span class=\"ff70\">10,737<span class=\"_ _1c\"> </span>10,616<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs3e2\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs3e3\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3e4\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3e5\">US$M </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3e6\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3e7\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff72 fs2 fc3 sc0 ls5 ws2 gs3e8\">Factors affecting income tax expense for the year<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3e9\">Income tax expense differs to the standard rate of corporation tax as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs3ea\">Profit before taxation<span class=\"_ _2a1\"> </span><span class=\"ff6f\">21,401<span class=\"_ _242\"> </span><span class=\"ff70\">33,137<span class=\"_ _1c\"> </span>24,292<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs3eb\">T<span class=\"_ _2a\"></span>ax on profit at <span class=\"_ _2\"></span>Australian prima facie tax rate of 30 per cent<span class=\"_ _2a2\"> </span><span class=\"ff6f\">6,420<span class=\"_ _64\"> </span><span class=\"ff70\">9,941<span class=\"_ _64\"> </span>7,288<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3ec\">Derecognition of deferred tax assets and current year tax losses</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs3ed\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs3ee\">526<span class=\"_ _64\"> </span><span class=\"ff70\">1,087<span class=\"_ _64\"> </span>2,640<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3ef\">T<span class=\"_ _2a\"></span>ax on remitted and unremitted foreign earnings<span class=\"_ _3d\"> </span><span class=\"ff6f\">137<span class=\"_ _6f\"> </span></span>441<span class=\"_ _25\"> </span>485<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3f0\">Foreign exchange adjustments<span class=\"_ _2a3\"> </span><span class=\"ff6f\">94<span class=\"_ _9c\"> </span></span>(233)<span class=\"_ _b5\"> </span>(33)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs3f1\">T<span class=\"_ _2a\"></span>ax rate changes<span class=\"_ _129\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _c5\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _68\"> </span></span></span>(1)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs3f2\">Amounts (over)/under provided in prior years <span class=\"_ _2a4\"> </span><span class=\"ff6f\">(18)<span class=\"_ _b5\"> </span><span class=\"ff70\">(80)<span class=\"_ _10d\"> </span>(57)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs3f3\">T<span class=\"_ _2a\"></span>ax effect of profit/(loss) from equity accounted investments, related impairments and expenses<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs3f4\">2</div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3f5\"> <span class=\"_ _214\"> </span><span class=\"ff6f\">(37)<span class=\"_ _10d\"> </span></span>(19)<span class=\"_ _c8\"> </span>315<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3f6\">Recognition of previously unrecognised tax assets <span class=\"_ _2a5\"> </span><span class=\"ff6f\">(109)<span class=\"_ _b0\"> </span></span>(3)<span class=\"_ _b5\"> </span>(28)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3f7\">Impact of tax rates applicable outside of <span class=\"_ _2\"></span>Australia<span class=\"_ _2a6\"> </span><span class=\"ff6f\">(558)<span class=\"_ _95\"> </span></span>(801)<span class=\"_ _e\"> </span>(669)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs3f8\">Other <span class=\"_ _2a7\"> </span><span class=\"ff6f\">236<span class=\"_ _a\"> </span></span>97<span class=\"_ _6f\"> </span>436<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs3f9\">Income tax expense<span class=\"_ _275\"> </span><span class=\"ff6f\">6,691<span class=\"_ _1c\"> </span><span class=\"ff70\">10,430<span class=\"_ _1c\"> </span>10,376<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h4 ff72 fs2 fc3 sc0 ls5 ws2 gs3fa\">Royalty-related taxation (net of income tax benefit)</div><div class=\"t m0 h138 ff6f fs21 fc3 sc0 ls5 ws2 gs3fb\">3 </div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs3fc\">386<span class=\"_ _25\"> </span><span class=\"ff70\">307<span class=\"_ _6f\"> </span>240<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs3fd\">T<span class=\"_ _2\"></span>otal taxation expense<span class=\"_ _2a0\"> </span><span class=\"ff6f\">7,077<span class=\"_ _242\"> </span><span class=\"ff70\">10,737<span class=\"_ _1c\"> </span>10,616<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3fe\">1 <span class=\"_ _42\"> </span>Includes the tax impacts related to the exceptional impairments of US deferred tax assets in the year ended 30 June 2022 and, NSWEC and Potash in the year ended </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs3ff\">30 June 2021, as presented in note 3 \u2018Exceptional items\u2019. </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs400\">2 <span class=\"_ _42\"> </span>The loss from equity accounted investments, related impairments and expenses is net of income tax, with the exception of the Samarco forward exchange derivatives </div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs401\">described in note 4 \u2018Significant events \u2013 Samarco dam failure\u2019. This item removes the prima facie tax effect on such loss, related impairments and expenses, excluding the </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs402\">impact of the Samarco forward exchange derivatives which are taxable.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs403\">3 <span class=\"_ _42\"> </span>Includes the revaluation of deferred tax balances in the year ended 30 June 2023, following the substantive enactment of the Chilean Royalty Bill, as presented in note 3 </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs404\">\u2018Exceptional items\u2019. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs405\">Income tax recognised in other comprehensive income is as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs406\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs407\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs408\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs409\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs40a\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs40b\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff72 fs2 fc3 sc0 ls5 ws2 gs40c\">Income tax effect of:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h45 ff73 fs2 fc3 sc0 ls5 ws2 gs40d\">Items that may be reclassified subsequently to the income statement:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs40e\">Hedges:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs40f\">Gains/(losses) taken to equity<span class=\"_ _2a8\"> </span><span class=\"ff6f\">(29)<span class=\"_ _c8\"> </span><span class=\"ff70\">274<span class=\"_ _9c\"> </span>(259)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs410\">(Gains)/losses transferred to the income statement<span class=\"_ _7d\"> </span><span class=\"ff6f\">45<span class=\"_ _95\"> </span><span class=\"ff70\">(264)<span class=\"_ _c8\"> </span>252<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs411\">Others<span class=\"_ _2a9\"> </span><span class=\"ff6f\">(1<span class=\"_ _2\"></span>1)<span class=\"_ _b0\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span><span class=\"ff70\">(1)<span class=\"_ _39c\"> </span></span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs412\">Income tax credit/(charge) relating to items that may be reclassified subsequently to the income statement<span class=\"_ _1f1\"> </span><span class=\"ff6f\">5<span class=\"_ _a\"> </span><span class=\"ff70\">10<span class=\"_ _68\"> </span>(8)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h45 ff73 fs2 fc3 sc0 ls5 ws2 gs413\">Items that will not be reclassified to the income statement:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs414\">Re-measurement gains/(losses) on pension and medical schemes<span class=\"_ _2aa\"> </span><span class=\"ff6f\">7<span class=\"_ _55\"> </span><span class=\"ff70\">(9)<span class=\"_ _10d\"> </span>(21)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs415\">Others<span class=\"_ _18b\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _74\"> </span></span></span>1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs416\">Income tax credit/(charge) relating to items that will not be reclassified to the income statement<span class=\"_ _2ab\"> </span><span class=\"ff6f\">7<span class=\"_ _55\"> </span><span class=\"ff70\">(9)<span class=\"_ _10d\"> </span>(20)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h4 ff72 fs2 fc3 sc0 ls5 ws2 gs417\">T<span class=\"_ _2\"></span>otal income tax credit/(charge) relating to components of other comprehensive income</div><div class=\"t m0 h138 ff6f fs21 fc3 sc0 ls5 ws2 gs418\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs419\">12<span class=\"_ _74\"> </span><span class=\"ff70\">1<span class=\"_ _14f\"> </span>(28)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs41a\">1 <span class=\"_ _42\"> </span>Included within total income tax relating to components of other comprehensive income is US$12 million relating to deferred taxes and US$ nil relating to current taxes </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs41b\">(2022: US$1 million and US$ nil; 2021: US$(28) million and US$ nil).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs41d\">Recognition and measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs41e\">T<span class=\"_ _2a\"></span>axation on the profit/(loss) for the year comprises current and deferred tax. T<span class=\"_ _50\"></span>axation is recognised in the income statement except to the extent </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs41f\">that it relates to items recognised directly in equity or other comprehensive income, in which case the tax effect is also recognised in equity or other </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs420\">comprehensive income.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff72 fs3 fc3 sc0 ls5 ws2 gs421\">Current tax<span class=\"_ _10e\"> </span>Deferred tax<span class=\"_ _22a\"> </span>Royalty-related taxation<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs422\">Current tax is the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs423\">expected tax on the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws23 gs424\">taxable income for the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs425\">year<span class=\"_ _2\"></span>, using tax rates </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs426\">and laws enacted or </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs427\">substantively enacted </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs428\">at the reporting </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs429\">date, and any </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs42a\">adjustments to tax </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs42b\">payable in respect of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs42c\">previous years.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs42d\">Deferred tax is the tax expected to be payable or recoverable on differences between the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs42e\">carrying amounts of assets and liabilities in the financial statements and the corresponding </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs42f\">tax bases used in the computation of taxable profit, and is accounted for in accordance </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs430\">with IAS 12/AASB 1<span class=\"_ _2\"></span>12 \u2018Income <span class=\"_ _2\"></span>T<span class=\"_ _2a\"></span>axes\u2019 (IAS 12).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs431\">Deferred tax is generally provided on temporary differences arising between the tax </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs432\">bases of assets and liabilities and their carrying amounts in the Financial Statements. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs433\">Deferred tax assets are recognised to the extent that it is probable that future taxable </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs434\">profits will be available against which the temporary differences can be utilised.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs435\">Deferred tax is not recognised for temporary differences relating to:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs436\">\u2013 <span class=\"_ _45\"> </span><span class=\"ff70\">initial recognition of goodwill<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs437\">\u2013 <span class=\"_ _45\"> </span><span class=\"ff70\">initial recognition of assets or liabilities in a transaction that is not a business combination and </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs438\">that affects neither accounting nor taxable profit, except where the transaction gives rise to </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs439\">equal and offsetting taxable and deductible temporary differences </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs43a\">\u2013 <span class=\"_ _45\"> </span><span class=\"ff70\">investment in subsidiaries, associates and jointly controlled entities where the Group is able </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs43b\">to control the timing of the reversal of the temporary difference and it is probable that they will </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs43c\">not reverse in the foreseeable future<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs43d\">Deferred tax is measured at the tax rates that are expected to be applied when the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs43e\">asset is realised or the liability is settled, based on the laws that have been enacted or </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs43f\">substantively enacted at the reporting date.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs440\">Current and deferred tax assets and liabilities are offset when the Group has a legally </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs441\">enforceable right to offset and when the tax balances are related to taxes levied by the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs442\">same tax authority and the Group intends to settle on a net basis, or realise the asset and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs443\">settle the liability simultaneously<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs444\">The carrying amount of deferred tax assets is reviewed at each reporting date and </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs445\">reduced to the extent that it is no longer probable that sufficient taxable profits will be </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs446\">available to allow all or part of the asset to be recovered.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs447\">Royalties are treated as taxation </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs448\">arrangements (impacting </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs449\">income tax expense/(benefit)) </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs44a\">when they are imposed under </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs44b\">government authority and the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs44c\">amount payable is calculated </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs44d\">by reference to revenue derived </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs44e\">(net of any allowable deductions) </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs44f\">after adjustment for temporary </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs450\">differences. Obligations arising </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs451\">from royalty arrangements that </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs452\">do not satisfy these criteria are </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs453\">recognised as current liabilities </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs454\">and included in expenses.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff72 fs11 fc3 sc0 ls5 ws2 gs455\">International T<span class=\"_ _2a\"></span>ax Reform \u2013 Pillar T<span class=\"_ _2\"></span>wo Model Rules<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs456\">The Organisation for Economic Co-operation and Development (OECD)/G20 Inclusive Framework on Base Erosion and Profit Shifting published the Pillar </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs457\">T<span class=\"_ _2\"></span>wo model rules designed to address the tax challenges arising from the digitalisation of the global economy<span class=\"_ _2\"></span>. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs458\">It is unclear if the Pillar T<span class=\"_ _2\"></span>wo model rules create additional temporary dif<span class=\"_ _2\"></span>ferences, whether to remeasure deferred taxes for the Pillar T<span class=\"_ _2\"></span>wo model rules and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs459\">which tax rate to use to measure deferred taxes. In response to this uncertainty<span class=\"_ _2\"></span>, on 23 May 2023 and 27 June 2023, respectively<span class=\"_ _2a\"></span>, the IASB and <span class=\"_ _2\"></span>AASB </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs45a\">issued amendments to IAS 12 \u2018Income taxes\u2019<span class=\"_ _2\"></span> introducing a mandatory temporary exception to the requirements of IAS 12 under which a company does </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs45b\">not recognise or disclose information about deferred tax assets and liabilities related to the proposed OECD/G20 BEPS Pillar T<span class=\"_ _2a\"></span>wo model rules. The Group </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs45c\">applied the temporary exception at 30 June 2023. </div><div class=\"t m0 h1f ff72 fs11 fc3 sc0 ls5 ws2 gs45d\">Uncertain tax and royalty matters<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls6 ws2 gs45e\">The Group operates across many tax jurisdictions. <span class=\"_ _2\"></span>Application of tax law can be complex and requires judgement to assess risk and estimate outcomes. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls6 ws2 gs45f\">These judgements are subject to risk and uncertainty<span class=\"_ _2\"></span>, hence there is a possibility that changes in circumstances will alter expectations, which may impact the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls6 ws2 gs460\">amount of tax assets and tax liabilities, including deferred tax, recognised on the balance sheet and the amount of other tax losses and temporary differences not </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls6 ws2 gs461\">yet recognised. The evaluation of tax risks considers both amended assessments received and potential sources of challenge from tax authorities. <span class=\"_ _2\"></span>The status<span class=\"_ _0\"></span> </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls6 ws2 gs462\">of proceedings for these matters will impact the ability to determine the potential exposure and in some cases, it may not be possible to determine a range of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls6 ws2 gs463\">possible outcomes or a reliable estimate of the potential exposure.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls6 ws2 gs464\">T<span class=\"_ _2a\"></span>ax and royalty matters with uncertain outcomes arise in the normal course of business and occur due to changes in tax law<span class=\"_ _2\"></span>, changes in interpretation of tax law<span class=\"_ _2\"></span>, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls6 ws2 gs465\">periodic challenges and disagreements with tax authorities and legal proceedings. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls6 ws5 gs466\">T<span class=\"_ _2a\"></span>ax and <span class=\"_ _2\"></span>royalty obligations assessed <span class=\"_ _2\"></span>as having <span class=\"_ _2\"></span>probable future economic <span class=\"_ _2\"></span>outflows capable of <span class=\"_ _2\"></span>reliable measurement <span class=\"_ _2\"></span>are provided for <span class=\"_ _2\"></span>as at 30 <span class=\"_ _2\"></span>June 2023. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls6 ws5 gs467\">Matters with <span class=\"_ _2\"></span>a possible economic <span class=\"_ _2\"></span>outflow and/or <span class=\"_ _2\"></span>presently incapable of <span class=\"_ _2\"></span>being measured reliably <span class=\"_ _2\"></span>are contingent <span class=\"_ _2\"></span>liabilities and disclosed <span class=\"_ _2\"></span>in note 34 <span class=\"_ _2\"></span>\u2018Contingent </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls6 ws5 gs468\">liabilities\u2019. Details <span class=\"_ _2\"></span>of uncertain tax <span class=\"_ _2\"></span>and royalty <span class=\"_ _2\"></span>matters relating to <span class=\"_ _2\"></span>Samarco are disclosed <span class=\"_ _2\"></span>in note <span class=\"_ _2\"></span>4 \u2018Significant events <span class=\"_ _2\"></span>\u2013 Samarco dam <span class=\"_ _2\"></span>failure\u2019.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff72 fs11 fc3 sc0 ls5 ws2 gs46a\">Key judgements and estimates<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc2 sc0 ls5 ws2 gs46b\">Income tax classification<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff6f fs5 fc3 sc0 ls5 ws2 gs46c\">Judgements:<span class=\"ff70\"> The Group\u2019<span class=\"_ _2\"></span>s accounting policy for taxation, including royalty-related taxation, requires management\u2019s judgement as to the types of </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs46d\">arrangements considered to be a tax on income in contrast to an operating cost.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs46e\">Deferred tax </div><div class=\"t m0 h8 ff6f fs5 fc3 sc0 ls5 ws2 gs46f\">Judgements:<span class=\"ff70\"> Judgement is required in:<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs470\">\u2013   <span class=\"_ _1ec\"></span>determining the amount of deferred tax assets to be recognised based on the likely timing and the level of future taxable profits;<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs471\">\u2013  <span class=\"ff70\"> <span class=\"_ _1ec\"></span>assessing whether changes in tax regimes or applicable tax rates are substantively enacted at the reporting date; </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs472\">\u2013  <span class=\"ff70\"> <span class=\"_ _1ec\"></span>recognising deferred tax liabilities arising from temporary differences in investments. These deferred tax liabilities caused principally by retained </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs473\">earnings held in foreign tax jurisdictions are recognised unless repatriation of retained earnings can be controlled and is not expected to occur in the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs474\">foreseeable future.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs475\">In FY2023, judgement was applied in determining the Chilean Royalty Bill was substantively enacted at the reporting date. It was considered that the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs476\">process of enactment was complete and the remaining steps for enactment would not change the outcome of the tax rates to be applied in measuring </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs477\">the deferred tax assets and liabilities.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff6f fs5 fc3 sc0 ls5 ws2 gs478\">Estimates:<span class=\"ff70\"> The Group assesses the recoverability of recognised and unrecognised deferred taxes, including losses in <span class=\"_ _2\"></span>Australia, the United States and </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs479\">Canada on a consistent basis. Estimates and assumptions relating to projected earnings and cash flows as applied in the Group impairment process </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs47a\">are used for operating assets.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs47b\">These forecasts are also used to estimate the royalty related tax rates to apply when the deferred tax assets are realised and deferred tax liabilities </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs47c\">are settled, in revaluing the deferred tax balances following the substantive enactment of the Chilean Royalty Bill.<span class=\"_ _39c\"> </span> </div><div class=\"t m0 hb ff6f fs7 fc7 sc0 ls5 ws2 gs47d\">7 <span class=\"_ _47\"> </span>Earnings per share<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff6f fs3 fc3 sc0 ls5 ws2 gs47e\">2023<span class=\"_ _203\"> </span><span class=\"ff70\">2022<span class=\"_ _203\"> </span>2021<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs47f\">Earnings attributable to BHP shareholders (US$M)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs480\">\u2013 Continuing operations<span class=\"_ _2ac\"> </span><span class=\"ff6f\">12,921<span class=\"_ _242\"> </span><span class=\"ff70\">20,245<span class=\"_ _206\"> </span>1<span class=\"_ _2\"></span>1,529<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs481\">\u2013 T<span class=\"_ _50\"></span>otal<span class=\"_ _2ad\"> </span><span class=\"ff6f\">12,921<span class=\"_ _242\"> </span><span class=\"ff70\">30,900<span class=\"_ _206\"> </span>1<span class=\"_ _2\"></span>1,304<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs482\">Weighted average number of shares (Million)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs483\">\u2013 Basic<span class=\"_ _2ae\"> </span><span class=\"ff6f\">5,064<span class=\"_ _64\"> </span><span class=\"ff70\">5,061<span class=\"_ _64\"> </span>5,057<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs484\">\u2013 Diluted<span class=\"_ _2af\"> </span><span class=\"ff6f\">5,073<span class=\"_ _64\"> </span><span class=\"ff70\">5,071<span class=\"_ _64\"> </span>5,068<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs485\">Basic earnings per ordinary share (US cents)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs486\">\u2013 Continuing operations<span class=\"_ _2b0\"> </span><span class=\"ff6f\">255.2<span class=\"_ _64\"> </span><span class=\"ff70\">400.0<span class=\"_ _64\"> </span>228.0<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs487\">\u2013 T<span class=\"_ _50\"></span>otal<span class=\"_ _2b1\"> </span><span class=\"ff6f\">255.2<span class=\"_ _64\"> </span><span class=\"ff70\">610.6<span class=\"_ _64\"> </span>223.5<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs488\">Diluted earnings per ordinary share (US cents)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs489\">\u2013 Continuing operations<span class=\"_ _2b0\"> </span><span class=\"ff6f\">254.7<span class=\"_ _64\"> </span><span class=\"ff70\">399.2<span class=\"_ _64\"> </span>227.5<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs48a\">\u2013 T<span class=\"_ _50\"></span>otal<span class=\"_ _2b1\"> </span><span class=\"ff6f\">254.7<span class=\"_ _64\"> </span><span class=\"ff70\">609.3<span class=\"_ _64\"> </span>223.0<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs48b\">Headline earnings per ordinary share (US cents)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs48c\">\u2013 Basic<span class=\"_ _2ae\"> </span><span class=\"ff6f\">256.1<span class=\"_ _64\"> </span><span class=\"ff70\">439.0<span class=\"_ _64\"> </span>284.8<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs48d\">\u2013 Diluted<span class=\"_ _2af\"> </span><span class=\"ff6f\">255.7<span class=\"_ _64\"> </span><span class=\"ff70\">438.1<span class=\"_ _64\"> </span>284.2<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs48e\">Refer to note 28 \u2018Discontinued operations\u2019<span class=\"_ _2\"></span> for basic earnings per share and diluted earnings per share for Discontinued operations.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs48f\">Earnings on <span class=\"_ _2\"></span>American Depositary Shares represent twice the earnings for BHP Group Limited ordinary shares.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs490\">Headline earnings is a Johannesburg Stock Exchange defined performance measure and is reconciled from earnings attributable to ordinary </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs491\">shareholders as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs492\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs493\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs494\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs495\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs496\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs497\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs498\">Earnings attributable to BHP shareholders<span class=\"_ _141\"> </span>12,921<span class=\"_ _1c\"> </span><span class=\"ff70\">30,900<span class=\"_ _1a\"> </span>1<span class=\"_ _2\"></span>1,304<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h45 ff73 fs2 fc3 sc0 ls5 ws2 gs499\">Adjusted for:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs49a\">(Gain)/loss on sales of PP&amp;E, Investments and Operations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs49b\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs49c\">(9)<span class=\"_ _b5\"> </span><span class=\"ff70\">(95)<span class=\"_ _10d\"> </span>(50)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs49d\">Impairments of property<span class=\"_ _2\"></span>, plant and equipment, financial assets and intangibles<span class=\"_ _24b\"> </span><span class=\"ff6f\">75<span class=\"_ _25\"> </span><span class=\"ff70\">515<span class=\"_ _64\"> </span>2,633<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs49e\">Samarco impairment expense<span class=\"_ _2b2\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _1fb\"> </span></span></span><span class=\"lsd3 ws102\">111<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs49f\">Cerrej\u03ccn impairment expense<span class=\"_ _2b3\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _55\"> </span></span> \u2212<span class=\"_ _25\"> </span><span class=\"ff70\">466<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs4a0\">Gain on disposal of BHP Mitsui Coal<span class=\"_ _2b4\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _9c\"> </span></span>(840)<span class=\"_ _b0\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs4a1\">Gain on merger of Petroleum<span class=\"_ _2b5\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _12a\"> </span></span>(8,167)<span class=\"_ _b0\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4a2\">T<span class=\"_ _2a\"></span>ax effect of above adjustments<span class=\"_ _281\"> </span><span class=\"ff6f\">(17)<span class=\"_ _10d\"> </span></span>(97)<span class=\"_ _b5\"> </span>(60)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4a3\">Subtotal of adjustments<span class=\"_ _2b6\"> </span><span class=\"ff6f\">49<span class=\"_ _12a\"> </span></span>(8,684)<span class=\"_ _b8\"> </span>3,100<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs4a4\">Headline earnings<span class=\"_ _294\"> </span>12,970<span class=\"_ _242\"> </span><span class=\"ff70\">22,216<span class=\"_ _1c\"> </span>14,404<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs4a5\">Diluted headline earnings<span class=\"_ _12f\"> </span>12,970<span class=\"_ _1c\"> </span><span class=\"ff70\">22,216<span class=\"_ _1c\"> </span>14,404<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs4a6\">1 <span class=\"_ _42\"> </span>Included in other income.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs4a7\">Recognition and measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4a8\">Diluted earnings attributable to BHP shareholders are equal to the earnings attributable to BHP shareholders.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs4a9\">Prior to the Group\u2019s corporate structure unification, the calculation of the number of ordinary shares used in the computation of basic earnings per share </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4aa\">was the aggregate of the weighted average number of ordinary shares of BHP Group Limited and BHP Group Plc outstanding during the period after </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4ab\">deduction of the number of shares held by the Billiton Employee Share Ownership T<span class=\"_ _2\"></span>rust and the BHP Group Limited Employee Equity <span class=\"_ _2\"></span>Trust (previously </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4ac\">known as \u2018BHP Billiton Limited Employee Equity <span class=\"_ _2\"></span>Trust\u2019). Ef<span class=\"_ _2\"></span>fective from 31 January 2022, the aggregate of the weighted average number of ordinary </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs4ad\">shares of only BHP Group Limited is considered in the computation of basic earnings per share. Refer to note 17 \u2018Share capital\u2019<span class=\"_ _2\"></span> for details on unification.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4af\">For the purposes of calculating diluted earnings per share, the effect of 9 million dilutive shares has been taken into account for the year ended 30 June </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4b0\">2023 (2022: 10 million shares; 2021: 1<span class=\"_ _2\"></span>1 million shares). <span class=\"_ _2\"></span>The Group\u2019s only potential dilutive ordinary shares are share awards granted under the employee </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4b1\">share ownership plans for which terms and conditions are described in note 26 \u2018Employee share ownership plans\u2019. Diluted earnings per share calculation </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4b2\">excludes instruments which are considered antidilutive.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4b3\">At 30 June 2023, there are no instruments which are considered antidilutive (2022: nil; 2021: nil). </div><div class=\"t m0 h11 ff6f fsa fc3 sc0 ls5 ws2 gs4b4\">Working capital<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff6f fs7 fc7 sc0 ls5 ws2 gs4b5\">8 <span class=\"_ _47\"> </span>T<span class=\"_ _2\"></span>rade and other receivables<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs4b6\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs4b7\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs4b8\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs4b9\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4ba\">T<span class=\"_ _2\"></span>rade receivables<span class=\"_ _2b7\"> </span><span class=\"ff6f\">3,418<span class=\"_ _8f\"> </span></span>4,41<span class=\"_ _2\"></span>1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4bb\">Other receivables</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs4bc\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs4bd\">1,324<span class=\"_ _64\"> </span><span class=\"ff70\">1,168<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs4be\">T<span class=\"_ _2\"></span>otal <span class=\"_ _2b8\"> </span>4,742<span class=\"_ _64\"> </span><span class=\"ff70\">5,579<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4bf\">Comprising:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4c0\">Current<span class=\"_ _1c7\"> </span><span class=\"ff6f\">4,594<span class=\"_ _64\"> </span></span>5,426<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4c1\">Non-current<span class=\"_ _2b9\"> </span><span class=\"ff6f\">148<span class=\"_ _25\"> </span></span>153<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs4c2\">1 <span class=\"_ _42\"> </span>Other receivables mainly relate to indirect tax refunds and receivables from joint venture partners. </div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs4c3\">Recognition and measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs4c4\">T<span class=\"_ _2\"></span>rade receivables are recognised initially at their transaction price or<span class=\"_ _2\"></span>, for those receivables containing a significant financing component, at fair value. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4c5\">T<span class=\"_ _2\"></span>rade receivables are subsequently measured at amortised cost using the effective interest method, less an allowance for impairment, except for </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs4c6\">provisionally priced receivables which are subsequently measured at fair value through profit or loss under IFRS 9. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs4c7\">The collectability of trade and other receivables is assessed continuously<span class=\"_ _2\"></span>. <span class=\"_ _2\"></span>At the reporting date, specific allowances are made for any expected credit </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4c8\">losses based on a review of all outstanding amounts at reporting period-end. Individual receivables are written off when management deems them </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4c9\">unrecoverable. The net carrying amount of trade and other receivables approximates their fair values. </div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs4ca\">Credit risk<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4cb\">T<span class=\"_ _2\"></span>rade receivables generally have terms of less than 30 days. The Group has no material concentration of credit risk with any single counterparty and is </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4cc\">not dominantly exposed to any individual industry<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs4cd\">Credit risk can arise from the non-performance by counterparties of their contractual financial obligations towards the Group. T<span class=\"_ _50\"></span>o manage credit risk, the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4ce\">Group maintains Group-wide procedures covering the application for credit approvals, granting and renewal of counterparty limits, proactive monitoring </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4cf\">of exposures against these limits and requirements triggering secured payment terms. <span class=\"_ _2\"></span>As part of these processes, the credit exposures with all </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4d0\">counterparties are regularly monitored and assessed on a timely basis. The credit quality of the Group\u2019s customers is reviewed and the solvency of each </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4d1\">debtor and their ability to pay the receivable is considered in assessing receivables for impairment.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4d2\">The 10 largest customers represented 31 per cent (2022: 34 per cent) of total credit risk exposures managed by the Group. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4d3\">Receivables are deemed to be past due or impaired in accordance with the Group\u2019s terms and conditions. These terms and conditions are determined on </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4d4\">a case-by-case basis with reference to the customer<span class=\"_ _0\"></span>\u2019s credit quality<span class=\"_ _2a\"></span>, payment performance and prevailing market conditions. <span class=\"_ _2\"></span>As at 30 June 2023, trade </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4d5\">receivables of US$8 million (2022: US$103 million) were past due but not impaired. The majority of these receivables were less than 30 days overdue.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4d6\">At 30 June 2023, trade receivables are stated net of provisions for expected credit losses of US$9 million (2022: US$3 million).<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff6f fs7 fc7 sc0 ls5 ws2 gs4d7\">9 <span class=\"_ _47\"> </span>T<span class=\"_ _2\"></span>rade and other payables<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs4d8\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs4d9\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs4da\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs4db\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4dc\">T<span class=\"_ _2\"></span>rade payables<span class=\"_ _230\"> </span><span class=\"ff6f\">4,893<span class=\"_ _64\"> </span></span>5,360<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4dd\">Other payables<span class=\"_ _2ba\"> </span><span class=\"ff6f\">1,407<span class=\"_ _64\"> </span></span>1,327<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs4de\">T<span class=\"_ _2\"></span>otal<span class=\"_ _2bb\"> </span>6,300<span class=\"_ _64\"> </span><span class=\"ff70\">6,687<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4df\">Comprising:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4e0\">Current<span class=\"_ _1c7\"> </span><span class=\"ff6f\">6,296<span class=\"_ _64\"> </span></span>6,687<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs4e1\">Non-current<span class=\"_ _1c7\"> </span><span class=\"ff6f\">4<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hb ff6f fs7 fc7 sc0 ls5 ws121 gs4e2\">10 Inventories<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs4e3\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs4e4\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs4e5\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs4e6\">US$M<span class=\"_ _109\"> </span><span class=\"ff72\">Definitions<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4e7\">Raw materials and consumables<span class=\"_ _d1\"> </span><span class=\"ff6f\">2,106<span class=\"_ _1ff\"> </span></span>1,713<span class=\"_ _109\"> </span>Spares, consumables and other supplies yet to be utilised in the production process or </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4e8\">in the rendering of services.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4e9\">Work in progress<span class=\"_ _2bc\"> </span><span class=\"ff6f\">3,514<span class=\"_ _64\"> </span></span>3,827<span class=\"_ _109\"> </span>Commodities currently in the production process that require further processing by the </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4ea\">Group to a saleable form.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4eb\">Finished goods<span class=\"_ _2bd\"> </span><span class=\"ff6f\">1,003<span class=\"_ _25\"> </span></span>710<span class=\"_ _109\"> </span>Commodities ready-for-sale and not requiring further processing by the Group.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs4ec\">T<span class=\"_ _2\"></span>otal</div><div class=\"t m0 h138 ff6f fs21 fc3 sc0 ls5 ws2 gs4ed\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs4ee\">6,623<span class=\"_ _64\"> </span><span class=\"ff70\">6,250<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs4ef\">Comprising:<span class=\"_ _298\"> </span><span class=\"ff71\">Inventories classified as non-current are not expected to be utilised or sold within</span> </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4f0\">12 months after the reporting date or within the operating cycle of the business.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4f1\">Current<span class=\"_ _a9\"> </span><span class=\"ff6f\">5,220<span class=\"_ _140\"> </span></span>4,935<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs4f2\">Non-current<span class=\"_ _212\"> </span><span class=\"ff6f\">1,403<span class=\"_ _64\"> </span></span>1,315<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs4f3\">1 <span class=\"_ _42\"> </span>Inventory write-downs of US$100 million were recognised during the year (2022: US$163 million; 2021: US$58 million). Inventory write-downs of US$37 million made in </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs4f4\">previous periods were reversed during the year (2022: US$23 million; 2021: US$26 million).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs4f6\">Recognition and measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4f7\">Regardless of the type of inventory and its stage in the production process, inventories are valued at the lower of cost and net realisable value. Cost is </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4f8\">determined primarily on the basis of average costs and involves estimates of expected metal recoveries and work in progress volumes, calculated using </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs4f9\">available industry<span class=\"_ _2\"></span>, engineering and scientific data. <span class=\"_ _2\"></span>These estimates are periodically reassessed by the Group taking into account technical analysis and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4fa\">historical performance. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4fb\">For processed inventories, cost is derived on an absorption costing basis. Cost comprises costs of purchasing raw materials and costs of production, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4fc\">including attributable mining and manufacturing overheads taking into consideration normal operating capacity<span class=\"_ _2\"></span>. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs4fd\">Inventory quantities are assessed primarily through surveys and assays.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h11 ff6f fsa fc3 sc0 ls5 ws2 gs4fe\">Resource assets<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff6f fs7 fc7 sc0 ls5 ws2 gs4ff\">1<span class=\"_ _2\"></span>1 <span class=\"_ _47\"> </span>Property<span class=\"_ _2a\"></span>, plant and equipment<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs500\">Land and </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs501\">buildings </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs502\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs503\">Plant and </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs504\">equipment </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs505\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs506\">Other mineral </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs507\">assets <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs508\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs509\">Assets under </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs50a\">construction </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs50b\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff72 fs3 fc3 sc0 ls5 ws2 gs50c\">Exploration </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs50d\">and evaluation </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs50e\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs50f\">T<span class=\"_ _2\"></span>otal <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs510\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs511\">Net book value \u2013 30 June 2023<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs512\">At the beginning of the financial year <span class=\"_ _e1\"> </span><span class=\"ff6f\">8,079<span class=\"_ _242\"> </span>35,500<span class=\"_ _64\"> </span>8,494<span class=\"_ _140\"> </span>9,031<span class=\"_ _25\"> </span>191<span class=\"_ _1c\"> </span>61,295<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs513\">Additions</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs514\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs515\">194<span class=\"_ _64\"> </span>1,024<span class=\"_ _6f\"> </span>842<span class=\"_ _64\"> </span>6,332<span class=\"_ _6d\"> </span>56<span class=\"_ _1ff\"> </span>8,448<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs516\">Acquisition of subsidiaries and operations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs517\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs518\">88<span class=\"_ _64\"> </span>2,256<span class=\"_ _64\"> </span>4,612<span class=\"_ _6f\"> </span>720<span class=\"_ _74\"> </span>\u2013<span class=\"_ _64\"> </span>7,676<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs519\">Remeasurements of index-linked freight contracts<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs51a\">3<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs51b\">\u2013<span class=\"_ _a\"> </span>53<span class=\"_ _74\"> </span>\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _6d\"> </span>53<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs51c\">Depreciation for the year<span class=\"_ _217\"> </span><span class=\"ff6f\">(586)<span class=\"_ _119\"> </span>(4,156)<span class=\"_ _e\"> </span>(225)<span class=\"_ _c5\"> </span>\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _12a\"> </span>(4,967)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs51d\">Impairments for the year</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs51e\">4<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs51f\">\u2013<span class=\"_ _14f\"> </span>(73)<span class=\"_ _c5\"> </span>\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _61\"> </span>(73)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs520\">Disposals<span class=\"_ _17d\"> </span><span class=\"ff6f\">(2)<span class=\"_ _b0\"> </span>(6)<span class=\"_ _c5\"> </span>\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _55\"> </span>(8)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs521\">T<span class=\"_ _2\"></span>ransfers and other movements<span class=\"_ _21e\"> </span><span class=\"ff6f\">367<span class=\"_ _140\"> </span>2,056<span class=\"_ _9c\"> </span>(419)<span class=\"_ _13\"> </span>(2,602)<span class=\"_ _b0\"> </span>(8)<span class=\"_ _e\"> </span>(606)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff72 fs2 fc3 sc0 ls5 ws2 gs522\">At the end of the financial year</div><div class=\"t m0 h138 ff6f fs21 fc3 sc0 ls5 ws2 gs523\">5<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs524\">8,140<span class=\"_ _242\"> </span>36,654<span class=\"_ _1c\"> </span>13,304<span class=\"_ _1c\"> </span>13,481<span class=\"_ _6f\"> </span>239<span class=\"_ _1c\"> </span>71,818<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs525\">\u2013 Cost<span class=\"_ _132\"> </span><span class=\"ff6f\">15,258<span class=\"_ _242\"> </span>85,394<span class=\"_ _1c\"> </span>19,420<span class=\"_ _1c\"> </span>14,245<span class=\"_ _140\"> </span>1,029<span class=\"_ _19b\"> </span>135,346<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs526\">\u2013 <span class=\"_ _2\"></span>Accumulated depreciation and impairments<span class=\"_ _1c3\"> </span><span class=\"ff6f\">(7,1<span class=\"_ _2\"></span>18)<span class=\"_ _93\"> </span>(48,740)<span class=\"_ _98\"> </span>(6,116)<span class=\"_ _95\"> </span>(764)<span class=\"_ _95\"> </span>(790)<span class=\"_ _93\"> </span>(63,528)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs527\">Net book value \u2013 30 June 2022<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs528\">At the beginning of the financial year <span class=\"_ _e1\"> </span><span class=\"ff70\">8,072<span class=\"_ _242\"> </span>44,682<span class=\"_ _64\"> </span>8,941<span class=\"_ _1c\"> </span>10,432<span class=\"_ _140\"> </span>1,686<span class=\"_ _242\"> </span>73,813<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs529\">Additions</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs52a\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs52b\">41<span class=\"_ _64\"> </span>1,935<span class=\"_ _6f\"> </span>792<span class=\"_ _64\"> </span>5,872<span class=\"_ _25\"> </span>137<span class=\"_ _140\"> </span>8,777<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs52c\">Remeasurements of index-linked freight contracts<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs52d\">3</div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs52e\"> \u2212<span class=\"_ _9c\"> </span><span class=\"ff70\">(369)<span class=\"_ _b0\"> </span></span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _9c\"> </span><span class=\"ff70\">(369)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs52f\">Depreciation for the year<span class=\"_ _217\"> </span>(663)<span class=\"_ _119\"> </span>(5,564)<span class=\"_ _e\"> </span>(276)<span class=\"_ _b0\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _12a\"> </span></span>(6,503)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs530\">Impairments for the year</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs531\">4<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs532\">(14)<span class=\"_ _95\"> </span>(499)<span class=\"_ _b0\"> </span>(2)<span class=\"_ _b0\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _9c\"> </span></span>(515)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs533\">Disposals<span class=\"_ _17d\"> </span>(3)<span class=\"_ _b5\"> </span>(22)<span class=\"_ _b0\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _61\"> </span></span>(25)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs534\">Divestment and demerger of subsidiaries and operations</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs535\">6<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs536\">(448)<span class=\"_ _13\"> </span>(8,007)<span class=\"_ _e\"> </span>(545)<span class=\"_ _13\"> </span>(3,549)<span class=\"_ _95\"> </span>(842)<span class=\"_ _93\"> </span>(13,391)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs537\">T<span class=\"_ _2\"></span>ransfers and other movements<span class=\"_ _87\"> </span>1,094<span class=\"_ _1ff\"> </span>3,344<span class=\"_ _9c\"> </span>(416)<span class=\"_ _98\"> </span>(3,724)<span class=\"_ _95\"> </span>(790)<span class=\"_ _e\"> </span>(492)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs538\">At the end of the financial year<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs539\">5<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs53a\">8,079<span class=\"_ _242\"> </span>35,500<span class=\"_ _140\"> </span>8,494<span class=\"_ _64\"> </span>9,031<span class=\"_ _6f\"> </span>191<span class=\"_ _1c\"> </span>61,295<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs53b\">\u2013 Cost<span class=\"_ _132\"> </span><span class=\"ff70\">14,823<span class=\"_ _242\"> </span>81,218<span class=\"_ _1c\"> </span>14,353<span class=\"_ _140\"> </span>9,755<span class=\"_ _25\"> </span>981<span class=\"_ _e7\"> </span>121,130<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs53c\">\u2013 <span class=\"_ _2\"></span>Accumulated depreciation and impairments<span class=\"_ _122\"> </span><span class=\"ff70\">(6,744)<span class=\"_ _93\"> </span>(45,718)<span class=\"_ _13\"> </span>(5,859)<span class=\"_ _e\"> </span>(724)<span class=\"_ _e\"> </span>(790)<span class=\"_ _93\"> </span>(59,835)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs53d\">1 <span class=\"_ _42\"> </span>Includes change in estimates and net foreign exchange gains/(losses) related to the closure and rehabilitation provisions for operating sites. Refer to note 15 \u2018Closure and </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs53e\">rehabilitation provisions\u2019.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs53f\">2 <span class=\"_ _42\"> </span>Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019<span class=\"_ _2\"></span> for more information. </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs540\">3 <span class=\"_ _42\"> </span>Relates to remeasurements of index-linked freight contracts including continuous voyage charters (CVCs). Refer to note 22 \u2018Leases\u2019.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs541\">4 <span class=\"_ _42\"> </span>Refer to note 13 \u2018Impairment of non-current assets\u2019 for information on impairments.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs542\">5 <span class=\"_ _42\"> </span>Includes the carrying value of the Group\u2019s right-of-use assets relating to land and buildings and plant and equipment of US$2,809 million (2022: US$2,361 million). </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs543\">Refer to note 22 \u2018Leases\u2019 for the movement of the right-of-use assets.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs544\">6 <span class=\"_ _42\"> </span>BMC and Petroleum were disposed in May 2022 and June 2022 respectively<span class=\"_ _2\"></span>. Refer to notes 3 \u2018Exceptional items\u2019<span class=\"_ _2\"></span> and 28 \u2018Discontinued operations\u2019 for more information.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs545\">Recognition and measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs546\">Property<span class=\"_ _2\"></span>, plant and equipment<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs547\">Property<span class=\"_ _2\"></span>, plant and equipment is recorded at cost less accumulated depreciation and impairment charges. Cost is the fair value of consideration given </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs548\">to acquire the asset at the time of its acquisition or construction and includes the direct costs of bringing the asset to the location and the condition </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs549\">necessary for operation and the estimated future costs of closure and rehabilitation of the facility<span class=\"_ _2\"></span>. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs54a\">Right-of-use assets are measured at cost, less any accumulated depreciation and impairment losses, and adjusted for any remeasurement of lease </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs54b\">liabilities. Refer to note 22 \u2018Leases\u2019<span class=\"_ _2\"></span> for further details. Right-of-use assets are presented within the category of property<span class=\"_ _2\"></span>, plant and equipment according to </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs54c\">the nature of the underlying asset leased. </div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs54d\">Exploration and evaluation<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs54e\">Exploration costs are incurred to discover mineral resources. Evaluation costs are incurred to assess the technical feasibility and commercial viability of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs54f\">resources found.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs550\">Exploration and evaluation expenditure is charged to the income statement as incurred, except in the following circumstances in which case the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs551\">expenditure may be capitalised:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs552\">\u2013  <span class=\"ff70\">the exploration and evaluation activity is within an area of interest that was previously acquired as an asset acquisition or in a business combination </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs553\">and measured at fair value on acquisition or<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs554\">\u2013  <span class=\"ff70\">the existence of a commercially viable mineral deposit has been established<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs555\">A<span class=\"_ _2\"></span> regular review of each area of interest is undertaken to determine the appropriateness of continuing to carry forward costs in relation to that area. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs556\">Capitalised costs are only carried forward to the extent that they are expected to be recovered through the successful exploitation of the area of interest or </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs557\">alternatively by its sale. T<span class=\"_ _50\"></span>o the extent that capitalised expenditure is no longer expected to be recovered, it is charged to the income statement.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs559\">Development expenditure<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs55a\">When proven mineral reserves are determined and development is sanctioned, capitalised exploration and evaluation expenditure is reclassified as </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs55b\">assets under construction within property<span class=\"_ _2\"></span>, plant and equipment. <span class=\"_ _2\"></span>All subsequent development expenditure is capitalised and classified as assets under </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs55c\">construction, provided commercial viability conditions continue to be satisfied.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs55d\">The Group may use funds sourced from external parties to finance the acquisition and development of assets and operations. Finance costs are </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs55e\">expensed as incurred, except where they relate to the financing of construction or development of qualifying assets. Borrowing costs directly attributable </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs55f\">to acquiring or constructing a qualifying asset are capitalised during the development phase. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs560\">In the instance where saleable material is extracted prior to the commissioning of a project/site, sale proceeds are recognised as revenue, with associated </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs561\">costs also recognised in the income statement. On completion of development, all assets included in assets under construction are reclassified as either </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs562\">plant and equipment or other mineral assets and depreciation commences. </div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs563\">Other mineral assets<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs564\">Other mineral assets comprise:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs565\">\u2013  <span class=\"ff70\">capitalised exploration, evaluation and development expenditure for assets in production<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs566\">\u2013  <span class=\"ff70\">mineral rights acquired<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs567\">\u2013  <span class=\"ff70\">capitalised development and production stripping costs<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls5 ws2 gs568\">Overburden removal costs<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs569\">The process of removing overburden and other waste materials to access mineral deposits is referred to as stripping. Stripping is necessary to obtain </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs56a\">access to mineral deposits and occurs throughout the life of an open-pit mine. Development and production stripping costs are classified as other mineral </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs56b\">assets in property<span class=\"_ _2\"></span>, plant and equipment. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs56c\">Stripping costs are accounted for separately for individual components of an ore body<span class=\"_ _2\"></span>. <span class=\"_ _2\"></span>The determination of components is dependent on the mine plan </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs56d\">and other factors, including the size, shape and geotechnical aspects of an ore body<span class=\"_ _2\"></span>. <span class=\"_ _2\"></span>The Group accounts for stripping activities as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls5 ws2 gs56e\">Development stripping costs<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs56f\">These are initial overburden removal costs incurred to obtain access to mineral deposits that will be commercially produced. These costs are capitalised </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs570\">when it is probable that future economic benefits (access to mineral ores) will flow to the Group and costs can be measured reliably<span class=\"_ _2\"></span>. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs571\">Once the production phase begins, capitalised development stripping costs are depreciated using the units of production method based on the proven </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs572\">and probable reserves of the relevant identified component of the ore body which the initial stripping activity benefits.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls5 ws2 gs573\">Production stripping costs<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs574\">These are post initial overburden removal costs incurred during the normal course of production activity<span class=\"_ _2\"></span>, which commences after the first saleable </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs575\">minerals have been extracted from the component. Production stripping costs can give rise to two benefits, the accounting for which is outlined below:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs576\">Production stripping activity<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs577\">Benefits of stripping activity<span class=\"_ _15a\"> </span><span class=\"ff70\">Extraction of ore (inventory) in current period.<span class=\"_ _29\"> </span>Improved access to future ore extraction.<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs578\">Period benefited<span class=\"_ _2be\"> </span><span class=\"ff70\">Current period<span class=\"_ _216\"> </span>Future period(s)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs579\">Recognition and </div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs57a\">measurement criteria<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs57b\">When the benefits of stripping activities are realised in </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs57c\">the form of inventory produced; the associated costs </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs57d\">are recorded in accordance with the Group\u2019s inventory </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs57e\">accounting policy<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs57f\">When the benefits of stripping activities are improved access </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs580\">to future ore; production costs are capitalised when all the </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs581\">following criteria are met:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs582\">\u2013 <span class=\"_ _45\"> </span>the production stripping activity improves access to a specific </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs583\">component of the ore body and it is probable that economic </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs584\">benefits arising from the improved access to future ore </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs585\">production will be realised </div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs586\">\u2013 <span class=\"_ _45\"> </span><span class=\"ff70\">the component of the ore body for which access has been </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs587\">improved can be identified<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs588\">\u2013 <span class=\"_ _45\"> </span><span class=\"ff70\">costs associated with that component can be </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs589\">measured reliably<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs58a\">Allocation of costs<span class=\"_ _10e\"> </span><span class=\"ff70\">Production stripping costs are allocated between the inventory produced and the production stripping asset using a life-of-<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs58b\">component waste-to-ore (or mineral contained) strip ratio. When the current strip ratio is greater than the estimated life-of-<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs58c\">component ratio a portion of the stripping costs is capitalised to the production stripping asset.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs58d\">Asset recognised from </div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs58e\">stripping activity<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs58f\">Inventory<span class=\"_ _1b8\"> </span>Other mineral assets within property<span class=\"_ _2a\"></span>, plant and equipment.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs590\">Depreciation basis<span class=\"_ _2bf\"> </span><span class=\"ff70\">Not applicable <span class=\"_ _133\"> </span>On a component-by-component basis using the units of </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs591\">production method based on proven and probable reserves.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff72 fs11 fc3 sc0 ls5 ws2 gs592\">Key judgements and estimates<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff6f fs5 fc3 sc0 ls5 ws2 gs593\">Judgements:<span class=\"ff70\"> Judgement is applied by management in determining the components of an ore body<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h8 ff6f fs5 fc3 sc0 ls5 ws2 gs594\">Estimates: <span class=\"ff70\">Estimates are used in the determination of stripping ratios and mineral reserves by component. Changes to estimates related to life-<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs595\">of-component waste-to-ore (or mineral contained) strip ratios and the expected ore production from identified components are accounted for </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs596\">prospectively and may affect depreciation rates and asset carrying values.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs598\">Depreciation<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs599\">Depreciation of assets, other than land, assets under construction and capitalised exploration and evaluation that are not depreciated, is calculated </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs59a\">using either the straight-line (SL) method or units of production (UoP) method, net of residual values, over the estimated useful lives of specific assets. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs59b\">The depreciation method and rates applied to specific assets reflect the pattern in which the asset\u2019s benefits are expected to be used by the Group. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs59c\">The Group\u2019s proved and probable reserves for minerals assets are used to determine UoP depreciation unless doing so results in depreciation charges </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs59d\">that do not reflect the asset\u2019s useful life. Where this occurs, alternative approaches to determining reserves are applied, to provide a phasing of periodic </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs59e\">depreciation charges that better reflects the asset\u2019s expected useful life. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs59f\">Where assets are dedicated to a mine lease, the useful lives below are subject to the lesser of the asset category\u2019s useful life and the life of the mine </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5a0\">lease, unless those assets are readily transferable to another productive mine.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs5a1\">Assets classified as held for sale are measured at the lower of their carrying amount and fair value less cost to sell and therefore not depreciated. </div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs5a2\">Key estimates<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5a3\">The determination of useful lives, residual values and depreciation methods involves estimates and assumptions and is reviewed annually<span class=\"_ _2\"></span>. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5a4\">Any changes to useful lives or any other estimates or assumptions, including the expected impact of climate change and the transition to a lower </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5a5\">carbon economy<span class=\"_ _2\"></span>, may af<span class=\"_ _2\"></span>fect prospective depreciation rates and asset carrying values. The table below summarises the principal depreciation methods </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5a6\">and rates applied to major asset categories by the Group.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5a7\">Category<span class=\"_ _2c0\"> </span>Buildings<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5a8\">Plant and </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5a9\">equipment<span class=\"_ _35\"> </span>Mineral rights<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff72 fs3 fc3 sc0 ls5 ws2 gs5aa\">Capitalised exploration, evaluation and </div><div class=\"t m0 h41 ff72 fs3 fc3 sc0 ls5 ws2 gs5ab\">development expenditure<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs5ac\">T<span class=\"_ _2\"></span>ypical depreciation methodology<span class=\"_ _9\"> </span>SL<span class=\"_ _2b\"> </span>SL<span class=\"_ _aa\"> </span>UoP<span class=\"_ _2c1\"> </span>UoP<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs5ad\">Depreciation rate<span class=\"_ _10b\"> </span>25-50 years<span class=\"_ _34\"> </span>3-30 years<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs5ae\">Based on the rate of <span class=\"_ _2\"></span> </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs5af\">depletion of reserves<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs5b0\">Based on the rate of <span class=\"_ _2\"></span> </div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs5b1\">depletion of reserves<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs5b2\">Commitments<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5b3\">The Group\u2019s commitments for capital expenditure were US$3,975 million as at 30 June 2023 (2022: US$2,820 million). The Group\u2019<span class=\"_ _2\"></span>s commitments related </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5b4\">to leases are included in note 22 \u2018Leases\u2019.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff6f fs7 fc7 sc0 ls5 ws2 gs5b5\">12 <span class=\"_ _47\"> </span>Intangible assets<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff6f fs3 fc3 sc0 ls5 ws2 gs5b6\">2023<span class=\"_ _1b9\"> </span><span class=\"ff70\">2022<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5b7\">Goodwill <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5b8\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5b9\">Other </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5ba\">intangibles </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5bb\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5bc\">T<span class=\"_ _2\"></span>otal <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5bd\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs5be\">Goodwill <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs5bf\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs5c0\">Other </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs5c1\">intangibles </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs5c2\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs5c3\">T<span class=\"_ _2a\"></span>otal <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs5c4\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs5c5\">Net book value<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs5c6\">At the beginning of the financial year<span class=\"_ _a7\"> </span><span class=\"ff6f\">1,197<span class=\"_ _6f\"> </span>172<span class=\"_ _64\"> </span>1,369<span class=\"_ _140\"> </span><span class=\"ff70\">1,197<span class=\"_ _25\"> </span>240<span class=\"_ _140\"> </span>1,437<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs5c7\">Additions<span class=\"_ _142\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _a\"> </span>51<span class=\"_ _6d\"> </span>51<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _a\"> </span></span></span>36<span class=\"_ _6d\"> </span>36<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs5c8\">Acquisition of subsidiaries and operations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs5c9\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff6f fs2 fc3 sc0 ls5 ws2 gs5ca\">192<span class=\"_ _74\"> </span>\u2013<span class=\"_ _25\"> </span>192<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs5cb\">Amortisation for the year<span class=\"_ _7f\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _61\"> </span>(94)<span class=\"_ _b5\"> </span>(94)<span class=\"_ _b0\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _61\"> </span></span></span>(60)<span class=\"_ _b5\"> </span>(60)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs5cc\">Impairments for the year</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs5cd\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff6f fs2 fc3 sc0 ls5 ws2 gs5ce\">\u2013<span class=\"_ _55\"> </span>(2)<span class=\"_ _b0\"> </span>(2)<span class=\"_ _b0\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs5cf\">Disposals<span class=\"_ _183\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _14f\"> </span>(15)<span class=\"_ _10d\"> </span>(15)<span class=\"_ _b0\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _14f\"> </span></span></span>(16)<span class=\"_ _10d\"> </span>(16)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs5d0\">Divestment and demerger of subsidiaries and operations</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs5d1\">3<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff6f fs2 fc3 sc0 ls5 ws2 gs5d2\">\u2013<span class=\"_ _55\"> </span><span class=\"ff72\"> \u2212<span class=\"_ _74\"> </span></span>\u2013<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _61\"> </span><span class=\"ff70\">(66)<span class=\"_ _b5\"> </span>(66)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs5d3\">T<span class=\"_ _2\"></span>ransfers and other movements<span class=\"_ _213\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _25\"> </span>109<span class=\"_ _6f\"> </span>109<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _6d\"> </span></span></span>38<span class=\"_ _a\"> </span>38<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs5d4\">At the end of the financial year<span class=\"_ _1b3\"> </span><span class=\"ff6f\">1,389<span class=\"_ _25\"> </span>221<span class=\"_ _140\"> </span>1,610<span class=\"_ _64\"> </span><span class=\"ff70\">1,197<span class=\"_ _6f\"> </span>172<span class=\"_ _64\"> </span>1,369<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs5d5\">\u2013 Cost<span class=\"_ _2c2\"> </span><span class=\"ff6f\">1,389<span class=\"_ _64\"> </span>1,529<span class=\"_ _64\"> </span>2,918<span class=\"_ _140\"> </span><span class=\"ff70\">1,197<span class=\"_ _64\"> </span>1,363<span class=\"_ _140\"> </span>2,560<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs5d6\">\u2013 <span class=\"_ _2\"></span>Accumulated amortisation and impairments<span class=\"_ _2ab\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _12a\"> </span>(1,308)<span class=\"_ _98\"> </span>(1,308)<span class=\"_ _b0\"> </span></span> \u2212<span class=\"_ _12a\"> </span><span class=\"ff70\">(1,191)<span class=\"_ _13\"> </span>(1,191)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs5d7\">1 <span class=\"_ _42\"> </span>Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019<span class=\"_ _2\"></span> for more information.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs5d8\">2 <span class=\"_ _42\"> </span>Refer to note 13 \u2018Impairment of non-current assets\u2019 for information on impairments.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs5d9\">3 <span class=\"_ _42\"> </span>Relates to the merger of Petroleum with Woodside in FY2022. Refer to note 28 \u2018Discontinued operations\u2019<span class=\"_ _2\"></span> for more information.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs5da\">Recognition and measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs5db\">Goodwill<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs5dc\">Where the fair value of the consideration paid for a business acquisition exceeds the fair value of the identifiable assets, liabilities and contingent liabilities </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5dd\">acquired, the difference is treated as goodwill. Where consideration is less than the fair value of acquired net assets, the difference is recognised </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5de\">immediately in the income statement. Goodwill is not amortised and is measured at cost less any impairment losses.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs5df\">Other intangibles<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs5e0\">The Group capitalises amounts paid for the acquisition of identifiable intangible assets, such as software, licences and initial payments for the acquisition </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5e1\">of mineral lease assets, where it is considered that they will contribute to future periods through revenue generation or reductions in cost. These assets, </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs5e2\">classified as finite life intangible assets, are carried in the balance sheet at the fair value of consideration paid (cost) less accumulated amortisation and </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs5e3\">impairment charges. Intangible assets with finite useful lives are amortised on a straight-line basis over their useful lives. The estimated useful lives are </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5e4\">generally no greater than eight years.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5e5\">Initial payments for the acquisition of intangible mineral lease assets are capitalised and amortised over the term of the permit. <span class=\"_ _2\"></span>A<span class=\"_ _2\"></span> regular review is </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5e6\">undertaken of each area of interest to determine the appropriateness of continuing to carry forward costs in relation to that area. Capitalised costs are </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5e7\">only carried forward to the extent that they are expected to be recovered through the successful exploitation of the area of interest or alternatively by its </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs5e8\">sale. T<span class=\"_ _50\"></span>o the extent that capitalised expenditure is no longer expected to be recovered, it is charged to the income statement.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs5e9\">Assets classified as held for sale are measured at the lower of their carrying amount and fair value less cost to sell and therefore not amortised. </div><div class=\"t m0 hb ff6f fs7 fc7 sc0 ls5 ws2 gs5eb\">13 <span class=\"_ _47\"> </span>Impairment of non-current assets<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5ec\">Cash generating unit<span class=\"_ _20f\"> </span>Segment<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5ed\">2023<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5ee\">Property<span class=\"_ _2\"></span>, plant </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5ef\">and equipment </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5f0\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5f1\">Goodwill </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5f2\">and other </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5f3\">intangibles </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5f4\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5f5\">Equity-<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5f6\">accounted </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5f7\">investment </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5f8\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5f9\">T<span class=\"_ _2\"></span>otal <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs5fa\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs5fb\">Other<span class=\"_ _1ea\"> </span>V<span class=\"_ _2\"></span>arious<span class=\"_ _1e0\"> </span><span class=\"ff6f\">73<span class=\"_ _74\"> </span>2<span class=\"_ _74\"> </span>\u2013<span class=\"_ _6d\"> </span>75<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs5fc\">T<span class=\"_ _2\"></span>otal impairment of non-current assets<span class=\"_ _13f\"> </span>73<span class=\"_ _74\"> </span>2<span class=\"_ _74\"> </span>\u2013<span class=\"_ _6d\"> </span>75<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs5fd\">Reversal of impairment<span class=\"_ _2c3\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls95 ws2 gs5fe\">Net impairment of non-current assets \u2013 Continuing operations<span class=\"_ _cb\"> </span><span class=\"ls5\">73<span class=\"_ _74\"> </span>2<span class=\"_ _74\"> </span>\u2013<span class=\"_ _a\"> </span>75<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs5ff\">Net impairment of non-current assets \u2013 Discontinued operations<span class=\"_ _100\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _74\"> </span>\u2013<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs600\">Net impairment of non-current assets<span class=\"_ _1f4\"> </span>73<span class=\"_ _74\"> </span>2<span class=\"_ _74\"> </span>\u2013<span class=\"_ _6d\"> </span>75<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs601\">Cash generating unit<span class=\"_ _20a\"> </span>Segment<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs602\">2022<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs603\">Property<span class=\"_ _2\"></span>, plant </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs604\">and equipment </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs605\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs606\">Goodwill <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs607\">and other </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs608\">intangibles </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs609\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs60a\">Equity-<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs60b\">accounted </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs60c\">investment </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs60d\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs60e\">T<span class=\"_ _2a\"></span>otal <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs60f\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs610\">Cerro Colorado<span class=\"_ _24b\"> </span>Copper<span class=\"_ _103\"> </span>455<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _6f\"> </span></span>455<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs611\">Other<span class=\"_ _1ea\"> </span>V<span class=\"_ _2\"></span>arious<span class=\"_ _1e0\"> </span>60<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _6d\"> </span></span>60<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs612\">T<span class=\"_ _2a\"></span>otal impairment of non-current assets<span class=\"_ _145\"> </span>515<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _6f\"> </span></span>515<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs613\">Reversal of impairment<span class=\"_ _226\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs614\">Net impairment of non-current assets \u2013 Continuing operations<span class=\"_ _2c4\"> </span><span class=\"ff70\">515<span class=\"_ _55\"> </span></span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _25\"> </span><span class=\"ff70\">515<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs615\">Net impairment of non-current assets \u2013 Discontinued operations<span class=\"_ _23a\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs616\">Net impairment of non-current assets<span class=\"_ _2c5\"> </span>515<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _25\"> </span></span>515<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs617\">Recognition and measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs618\">Impairment tests for all <span class=\"_ _2\"></span>non-financial assets (excluding goodwill) are <span class=\"_ _2\"></span>performed when there is an <span class=\"_ _2\"></span>indication of impairment. Goodwill is tested <span class=\"_ _2\"></span>for impairment </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs619\">at least annually<span class=\"_ _2a\"></span>. Where the asset does not <span class=\"_ _2\"></span>generate cash flows that are <span class=\"_ _2\"></span>independent from other assets, the <span class=\"_ _2\"></span>Group estimates the recoverable amount </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs61a\">of the cash generating <span class=\"_ _2\"></span>unit (CGU) to which the <span class=\"_ _2\"></span>asset belongs, being the smallest <span class=\"_ _2\"></span>identifiable group of assets that generates <span class=\"_ _2\"></span>cash inflows that are largely </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs61b\">independent of the cash <span class=\"_ _2\"></span>inflows from other assets or <span class=\"_ _2\"></span>groups of assets. If the <span class=\"_ _2\"></span>carrying amount of the asset or <span class=\"_ _2\"></span>CGU exceeds its recoverable amount, <span class=\"_ _2\"></span>the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs61c\">asset or CGU is impaired and an impairment loss is charged to the income statement so as to reduce the carrying amount in the balance sheet to its </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs61d\">recoverable amount. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs61e\">Previously impaired assets (excluding goodwill as impairment losses are not reversed in subsequent periods) are reviewed for possible reversal of previous </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs61f\">impairment at each reporting date. Impairment reversal cannot exceed the carrying amount that would have been determined (net of depreciation) had no </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs620\">impairment loss been recognised for the asset or CGU. Such reversal is recognised in the income statement. There were no reversals of impairment in the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs621\">current or prior year<span class=\"_ _2\"></span>. </div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs622\">How recoverable amount is calculated<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs623\">The recoverable amount is the higher of an asset\u2019s or CGU\u2019<span class=\"_ _2\"></span>s fair value less cost of disposal (FVLCD) and its value in use (VIU). </div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs624\">Fair value less cost of disposal </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs625\">FVLCD is an estimate of the amount that a market participant would pay for an asset or CGU, less the cost of disposal. FVLCD for mineral assets is </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs626\">generally determined using independent market assumptions to calculate the present value of the estimated future post-tax cash flows expected to arise </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs627\">from the continued use of the asset, including the anticipated cash flow effects of any capital expenditure to enhance production or reduce cost, and its </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs628\">eventual disposal where a market participant may take a consistent view<span class=\"_ _2\"></span>. Cash flows are discounted using an appropriate post-tax market discount rate to </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs629\">arrive at a net present value of the asset, which is compared against the asset\u2019s carrying value. FVLCD may also take into consideration other market-<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs62a\">based indicators of fair value. FVLCD are based primarily on Level 3 inputs as defined in note 24 \u2018Financial risk management\u2019 unless otherwise noted.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs62b\">V<span class=\"_ _2\"></span>alue in use </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs62c\">VIU is determined as the present value of the estimated future cash flows expected to arise from the continued use of the asset in its present form and </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs62d\">its eventual disposal or closure. VIU is determined by applying assumptions specific to the Group\u2019s continued use and cannot take into account future </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs62e\">development. These assumptions are dif<span class=\"_ _2\"></span>ferent to those used in calculating FVLCD and consequently the VIU calculation is likely to give a different result </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs62f\">(usually lower) to a FVLCD calculation.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff72 fs11 fc3 sc0 ls5 ws2 gs630\">Impairment of non-current assets (excluding goodwill)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs631\">No material impairment of non-current assets for the year ended 30 June 2023.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs632\">Impairment of non-current assets relating to the year ended 30 June 2022 are detailed below<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc2 sc0 ls5 ws2 gs633\">Impairment of Cerro Colorado </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws25 gs634\">The Group recognised a pre-tax impairment charge of US$455 million. The impairment charge primarily related to an increase in closure and rehabilitation </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs635\">provision at Cerro Colorado due to additional work required to re-profile waste dumps for closure and an increase in scope for the closure activities.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs636\">Impairment test for goodwill<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs637\">The carrying amount of goodwill has been allocated to the CGUs, or groups of CGUs, as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs638\">Cash generating unit<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs639\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs63a\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs63b\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs63c\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs63d\">Olympic Dam<span class=\"_ _231\"> </span><span class=\"ff6f\">1,010<span class=\"_ _64\"> </span></span>1,010<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs63e\">OZ Minerals Limited provisional goodwill<span class=\"_ _2a1\"> </span><span class=\"ff6f\">192<span class=\"_ _74\"> </span><span class=\"ff71\">\u2013<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs63f\">Other<span class=\"_ _c7\"> </span><span class=\"ff6f\">187<span class=\"_ _25\"> </span></span>187<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs640\">T<span class=\"_ _2\"></span>otal goodwill<span class=\"_ _2c6\"> </span>1,389<span class=\"_ _64\"> </span><span class=\"ff70\">1,197<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs642\">For the purpose of impairment testing, goodwill has been allocated to CGUs or groups of CGUs, that are expected to benefit from the synergies of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs643\">previous business combinations, which represent the level at which management will monitor and manage goodwill.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs644\">The Olympic Dam goodwill has been tested for impairment at 31 December 2022, as part of the Olympic Dam CGU. Details of the goodwill impairment </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs645\">test are provided below<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs646\">On 2 May 2023, the Group acquired OZ Minerals Limited (OZL) (refer to note 29 \u2018Business combination\u2019<span class=\"_ _2\"></span> for details). The goodwill arising from the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs647\">acquisition of US$192 million represents the provisional amount, which could not be reliably allocated to a CGU or group of CGUs at 30 June 2023. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs648\">There were no indicators of impairment during the period from acquisition date to 30 June 2023 to suggest that the provisional goodwill had been </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs649\">impaired. Therefore, as at 30 June 2023, this goodwill has not yet been subject to any impairment testing. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs64a\">Goodwill held by other CGUs is US$187 million (2022: US$187 million). This represents less than one per cent of net assets at 30 June 2023 </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs64b\">(2022: less than one per cent). There was no impairment of other goodwill in the year to 30 June 2023 (2022: US$ nil).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs64c\">Olympic Dam goodwill<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff6f fs5 fc3 sc0 ls5 ws2 gs64d\">Impairment test conclusion <span class=\"_ _21\"> </span><span class=\"ff70\">The Group performed an impairment test of the Olympic Dam CGU, including goodwill, as at 31 December 2022 </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs64e\">and an impairment charge was not required. <span class=\"_ _2\"></span>A<span class=\"_ _2\"></span> goodwill impairment test was not required at 30 June 2023 as there </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs64f\">were no indicators of impairment.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff6f fs5 fc3 sc0 ls5 ws2 gs650\">How did the goodwill arise?<span class=\"_ _24f\"> </span><span class=\"ff70\">Goodwill arose on the acquisition of WMC Resources Ltd in June 2005. </span></div><div class=\"t m0 h8 ff6f fs5 fc3 sc0 ls5 ws2 gs651\">Segment<span class=\"_ _214\"> </span><span class=\"ff70\">Olympic Dam is part of the Copper reportable segment.<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h7 ff6f fs5 fc3 sc0 ls5 ws2 gs652\">How were the </div><div class=\"t m0 h7 ff6f fs5 fc3 sc0 ls5 ws2 gs653\">valuations calculated?<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs654\">FVLCD methodology using DCF techniques has been applied in determining the recoverable amount of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs655\">Olympic Dam.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h7 ff72 fs5 fc3 sc0 ls5 ws2 gs656\">Significant assumptions </div><div class=\"t m0 h7 ff6f fs5 fc3 sc0 ls5 ws2 gs657\">and sensitivities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs658\">The valuation of Olympic Dam exceeded its carrying amount by approximately US$4.2 billion (2022: US$2.4 billion) </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs659\">and is most sensitive to changes in copper and gold commodity prices, production volumes, operating costs and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs65a\">discount rates. The valuation applied a post-tax real discount rate of 6.5 per cent (2022: 6.5 per cent). </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs65b\">Changes in copper and gold commodity price forecasts, estimated production volumes and operating costs and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs65c\">discount rates in the period between 31 December 2022 and 30 June 2023, including an increase to the discount </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs65d\">rate applied to Olympic Dam to 7.0 per cent, did not result in an indicator of impairment. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs65e\">Further<span class=\"_ _2\"></span>, it is considered that there are no reasonably possible changes in copper and gold price forecasts, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs65f\">operating cost estimates or the discount rate that would, in isolation, result in the estimated recoverable amount </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs660\">being equal to the carrying amount.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs661\">A<span class=\"_ _2\"></span> production volume decrease of 9.9 per cent (2022: 6 per cent) across all commodities (copper<span class=\"_ _2\"></span>, gold, silver </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs662\">and uranium) would, in isolation, result in the estimated recoverable amount being equal to the carrying amount. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs663\">T<span class=\"_ _2\"></span>ypically<span class=\"_ _2\"></span>, changes in any one of the aforementioned assumptions (including operating performance) would be </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs664\">accompanied by a change in another assumption which may have an offsetting impact. <span class=\"_ _2\"></span>Action is usually taken to </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs665\">respond to adverse changes in assumptions to mitigate the impact of any such change.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs666\">Key judgements and estimates that have been applied in the FVLCD valuation are disclosed further below<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div>Key judgements and estimates<span class=\"_ _39c\"> </span>Judgements: <span class=\"ff70\">Assessment of indicators of impairment or impairment </span>reversal and the determination of CGUs for impairment purposes require significant management judgement.<span class=\"_ _39c\"> </span>Indicators of impairment may include changes in the Group\u2019s operating and economic assumptions, including those arising from changes in reserves or mine planning, updates to the Group\u2019s commodity supply<span class=\"_ _2a\"></span>, demand and price forecasts, or the possible additional impacts from emerging risks including those related to climate change and the transition to a low-carbon economy<span class=\"_ _2\"></span>. Climate change<span class=\"_ _39c\"> </span>The Group\u2019s impairment assessments may be impacted by climate change and the transition to a low-carbon economy<span class=\"_ _2\"></span>. Further detail is provided in note 16 \u2018Climate Change\u2019. Estimates:<span class=\"ff70\"> The Group performs a recoverable amount determination </span>for an asset or CGU when there is an indication of impairment or impairment reversal. When the recoverable amount is measured by reference to FVLCD, in the absence of quoted market prices or binding sale agreement, estimates are made regarding the present value of future post-tax cash flows. These estimates are made from the perspective of a market participant and include prices, future production volumes, operating costs, capital expenditure, closure and rehabilitation costs, taxes, risking factors applied to cash flows and discount rates. The cash flow forecasts may include net cash flows expected from the extraction, processing and sale of material that does not currently qualify for inclusion in ore reserves. Reserves and resources are included in the assessment of FVLCD to the extent that it is considered probable that a market participant would attribute value to them.<span class=\"_ _39c\"> </span>When recoverable amount is measured using VIU, estimates are made regarding the present value of future cash flows based on internal budgets and forecasts and life of asset plans. Key estimates are similar to those identified for FVLCD, although some assumptions and values may differ as they reflect the perspective of management rather than a market participant. All estimates require judgements and assumptions and are subject to risk and uncertainty that may be beyond the control of the Group; hence, there is a possibility that changes in circumstances will materially alter projections, which may impact the recoverable amount of an asset or CGU at each reporting date. While no indicators of impairment, or impairment reversal, were identified across the Group\u2019s CGUs at 30 June 2023, the carrying value of the Spence and Nickel West CGUs are the most susceptible to changes in the significant estimates outlined below in the next reporting period.<span class=\"_ _39c\"> </span>The significant estimates impacting the Group\u2019s recoverable amount determinations are:<span class=\"_ _39c\"> </span>Commodity prices<span class=\"_ _39c\"> </span>Commodity prices were based on latest internal forecasts which assume short-term market prices will revert to the Group\u2019s assessment of long-term price. These price forecasts reflect management\u2019<span class=\"_ _2\"></span>s long-term views of global supply and demand, built upon past experience of the commodity markets and are benchmarked with external sources of information such as analyst forecasts. Prices are adjusted based upon premiums or discounts applied to global price markers to reflect the location, nature and quality of the Group\u2019s production, or to take into account contracted prices.<span class=\"_ _39c\"> </span>Future production volumes<span class=\"_ _39c\"> </span>Estimated production volumes were based on detailed data and took into account development plans established by management as part of the Group\u2019s long-term planning process. When estimating FVLCD, assumptions reflect all reserves and resources that a market participant would consider when valuing the respective CGU, which in some cases are broader in scope than the reserves that would be used in a VIU test. In determining FVLCD, risk factors may be applied to reserves and resources which do not meet the criteria to be treated as proved.<span class=\"_ _39c\"> </span>Cash outflows (including operating costs, capital expenditure,<span class=\"ff74\"> </span>closure and rehabilitation costs and taxes)<span class=\"_ _39c\"> </span>Cash outflows are based on internal budgets and forecasts and life of asset plans. Cost assumptions reflect management experience and expectations. T<span class=\"_ _50\"></span>ax assumptions reflect existing and substantively enacted tax and royalty regimes and rates applicable in the jurisdiction of the CGU. In the case of FVLCD, cash flow projections include the anticipated cash flow effects of any capital expenditure to enhance production or reduce cost where a market participant may take a consistent view<span class=\"_ _2\"></span>. VIU does not take into account future development.<span class=\"_ _39c\"> </span>Discount rates<span class=\"_ _39c\"> </span>The Group uses real post-tax discount rates applied to real post-tax cash flows. The discount rates are derived using the weighted average cost of capital methodology<span class=\"_ _2\"></span>. <span class=\"_ _2\"></span>Adjustments to the rates are made for any risks that are not reflected in the underlying cash flows, including country risk.<span class=\"_ _39c\"> </span>14 <span class=\"_ _47\"> </span>Deferred tax balances<span class=\"_ _39c\"> </span>The movement for the year in the Group\u2019s net deferred tax position is as follows:<span class=\"_ _39c\"> </span>2023 <span class=\"_ _2\"></span> US$M<span class=\"_ _39c\"> </span>2022 <span class=\"_ _2\"></span> US$M<span class=\"_ _39c\"> </span>2021 <span class=\"_ _2\"></span> US$M<span class=\"_ _39c\"> </span>Net deferred tax (liability)/asset<span class=\"_ _39c\"> </span>At the beginning of the financial year<span class=\"_ _2c7\"> </span><span class=\"ff6f\">(3,007)<span class=\"_ _13\"> </span><span class=\"ff70\">(1,402)<span class=\"_ _10d\"> </span>(91)<span class=\"_ _39c\"> </span></span></span>Acquisition of subsidiaries and operations<span class=\"_ _39c\"> </span>1<span class=\"_ _39c\"> </span>(867)<span class=\"_ _b0\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span>Income tax charge recorded in the income statement<span class=\"_ _39c\"> </span>2,3<span class=\"_ _39c\"> </span>(387)<span class=\"_ _95\"> </span><span class=\"ff70\">(125)<span class=\"_ _98\"> </span>(1,325)<span class=\"_ _39c\"> </span></span>Income tax credit/(charge) recorded directly in equity<span class=\"_ _2c8\"> </span><span class=\"ff6f\">6<span class=\"_ _14f\"> </span><span class=\"ff70\">(42)<span class=\"_ _14f\"> </span>42<span class=\"_ _39c\"> </span></span></span>Divestment and demerger of subsidiaries and operations<span class=\"_ _39c\"> </span>4<span class=\"_ _39c\"> </span>\u2013<span class=\"_ _12a\"> </span><span class=\"ff70\">(1,439)<span class=\"_ _b0\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _39c\"> </span></span></span>Other movements<span class=\"_ _240\"> </span><span class=\"ff6f\">12<span class=\"_ _74\"> </span></span>1<span class=\"_ _14f\"> </span>(28)<span class=\"_ _39c\"> </span>At the end of the financial year<span class=\"_ _194\"> </span><span class=\"ff6f\">(4,243)<span class=\"_ _119\"> </span><span class=\"ff70\">(3,007)<span class=\"_ _98\"> </span>(1,402)<span class=\"_ _39c\"> </span></span></span>1 <span class=\"_ _42\"> </span>Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019<span class=\"_ _2\"></span> for more information.<span class=\"_ _39c\"> </span>2 <span class=\"_ _42\"> </span>Includes Discontinued operations income tax (charge)/credit to the income statement in 2022 of US$(61) million (2021: US$273 million).<span class=\"_ _39c\"> </span>3 <span class=\"_ _42\"> </span>Includes US$(283) million revaluation of deferred tax balances in the year ended 30 June 2023, following the substantive enactment of the Chilean Royalty Bill. Refer to note 3 \u2018Exceptional items\u2019 for more information.<span class=\"_ _39c\"> </span>4 <span class=\"_ _42\"> </span>Relates to the divestment of BMC and merger of Petroleum with Woodside. Refer to notes 3 \u2018Exceptional items\u2019<span class=\"_ _2\"></span> and 28 \u2018Discontinued operations\u2019 for more information.<span class=\"_ _39c\"> </span>For recognition and measurement refer to note 6 \u2018Income tax expense\u2019<span class=\"_ _39c\"> </span><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs6d6\">The composition of the Group\u2019s net deferred tax assets and liabilities recognised in the balance sheet and the deferred tax expense charged/(credited)<span class=\"ff70\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs6d7\">to the income statement is as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff72 fs3 fc3 sc0 ls5 ws2 gs6d8\">Deferred tax assets<span class=\"_ _1fe\"> </span>Deferred tax liabilities<span class=\"_ _1a1\"> </span><span class=\"ff6f\">Charged/(credited) to the income statement<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs6d9\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs6da\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs6db\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs6dc\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs6dd\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs6de\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs6df\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs6e0\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs6e1\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs6e2\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs6e3\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs6e4\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs6e5\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs6e6\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff6f fs2 fc3 sc0 ls5 ws2 gs6e7\">T<span class=\"_ _2\"></span>ype of temporary difference<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs6e8\">Depreciation<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs6e9\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs6ea\">(629)<span class=\"_ _95\"> </span><span class=\"ff70\">(526)<span class=\"_ _b8\"> </span></span>6,259<span class=\"_ _140\"> </span><span class=\"ff70\">4,844<span class=\"_ _25\"> </span></span>452<span class=\"_ _6f\"> </span><span class=\"ff70\">554<span class=\"_ _25\"> </span>488<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs6eb\">Exploration expenditure<span class=\"_ _157\"> </span><span class=\"ff6f ls49 ws4e\">11<span class=\"_ _74\"> </span></span>9<span class=\"_ _68\"> </span><span class=\"ff6f\">(1)<span class=\"_ _2b\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _68\"> </span></span>(2)<span class=\"_ _bb\"> </span></span>13<span class=\"_ _25\"> </span>347<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs6ec\">Employee benefits<span class=\"_ _87\"> </span><span class=\"ff6f\">27<span class=\"_ _a\"> </span><span class=\"ff70\">21<span class=\"_ _9c\"> </span></span>(425)<span class=\"_ _e\"> </span><span class=\"ff70\">(322)<span class=\"_ _b5\"> </span></span>(94)<span class=\"_ _bb\"> </span><span class=\"ff70\">20<span class=\"_ _61\"> </span>(68)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs6ed\">Closure and rehabilitation<span class=\"_ _1c6\"> </span><span class=\"ff6f\">143<span class=\"_ _25\"> </span></span>104<span class=\"_ _12a\"> </span><span class=\"ff6f\">(1,753)<span class=\"_ _13\"> </span></span>(1,448)<span class=\"_ _95\"> </span><span class=\"ff6f\">(296)<span class=\"_ _14f\"> </span></span>24<span class=\"_ _9c\"> </span>(515)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs6ee\">Resource rent tax <span class=\"_ _2c9\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _74\"> </span></span>\u2013<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _74\"> </span></span>\u2013<span class=\"_ _9c\"> </span></span>(129)<span class=\"_ _e\"> </span>(309)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs6ef\">Other provisions<span class=\"_ _17f\"> </span><span class=\"ff6f\">64<span class=\"_ _a\"> </span></span>70<span class=\"_ _9c\"> </span><span class=\"ff6f\">(210)<span class=\"_ _e\"> </span></span>(192)<span class=\"_ _c5\"> </span><span class=\"ff6f\">4<span class=\"_ _6d\"> </span></span>49<span class=\"_ _a\"> </span>77<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs6f0\">Deferred income<span class=\"_ _21e\"> </span><span class=\"ff6f\">14<span class=\"_ _6d\"> </span></span>51<span class=\"_ _74\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _55\"> </span></span>(1)<span class=\"_ _bb\"> </span><span class=\"ff6f\">37<span class=\"_ _14f\"> </span></span>(31)<span class=\"_ _10d\"> </span>(31)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs6f1\">Deferred charges<span class=\"_ _94\"> </span><span class=\"ff6f\">(82)<span class=\"_ _b5\"> </span></span>(57)<span class=\"_ _c8\"> </span><span class=\"ff6f\">644<span class=\"_ _6f\"> </span></span>584<span class=\"_ _6d\"> </span><span class=\"ff6f\">85<span class=\"_ _74\"> </span></span>7<span class=\"_ _a\"> </span>68<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs6f2\">Investments, including foreign tax credits<span class=\"_ _123\"> </span><span class=\"ff6f\">225<span class=\"_ _25\"> </span></span>139<span class=\"_ _6f\"> </span><span class=\"ff6f\">370<span class=\"_ _25\"> </span></span>365<span class=\"_ _61\"> </span><span class=\"ff6f\">(54)<span class=\"_ _95\"> </span></span>(298)<span class=\"_ _c8\"> </span>414<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs6f3\">Foreign exchange gains and losses<span class=\"_ _1a9\"> </span><span class=\"ff6f\">(14)<span class=\"_ _b5\"> </span></span>(13)<span class=\"_ _c8\"> </span><span class=\"ff6f\">190<span class=\"_ _6f\"> </span></span>154<span class=\"_ _6d\"> </span><span class=\"ff6f\">42<span class=\"_ _a\"> </span></span>33<span class=\"_ _6d\"> </span>63<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs6f4\">T<span class=\"_ _2a\"></span>ax losses<span class=\"_ _1f3\"> </span><span class=\"ff6f\">276<span class=\"_ _25\"> </span></span>225<span class=\"_ _9c\"> </span><span class=\"ff6f\">(214)<span class=\"_ _e\"> </span></span>(307)<span class=\"_ _bb\"> </span><span class=\"ff6f\">37<span class=\"_ _6d\"> </span></span>28<span class=\"_ _25\"> </span>678<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs6f5\">Lease liability</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs6f6\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs6f7\">18<span class=\"_ _a\"> </span><span class=\"ff70\">17<span class=\"_ _1b\"> </span></span>(767)<span class=\"_ _95\"> </span><span class=\"ff70\">(594)<span class=\"_ _10d\"> </span></span>(83)<span class=\"_ _10d\"> </span><span class=\"ff70\">(10)<span class=\"_ _bb\"> </span>67<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs6f8\">Other<span class=\"_ _2ca\"> </span><span class=\"ff6f\">3<span class=\"_ _a\"> </span></span>16<span class=\"_ _6f\"> </span><span class=\"ff6f\">206<span class=\"_ _61\"> </span></span>(20)<span class=\"_ _203\"> </span><span class=\"ff6f\">259<span class=\"_ _9c\"> </span></span>(135)<span class=\"_ _bb\"> </span>46<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs6f9\">T<span class=\"_ _2\"></span>otal <span class=\"_ _219\"> </span>56<span class=\"_ _a\"> </span><span class=\"ff70\">56<span class=\"_ _64\"> </span></span>4,299<span class=\"_ _140\"> </span><span class=\"ff70\">3,063<span class=\"_ _25\"> </span></span>387<span class=\"_ _6f\"> </span><span class=\"ff70\">125<span class=\"_ _64\"> </span>1,325<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs6fa\">1 <span class=\"_ _42\"> </span>Includes deferred tax associated with the recognition of right-of-use assets and lease liabilities on adoption of IFRS 16. Refer to note 22 \u2018Leases\u2019. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs6fb\">The composition of the Group\u2019s unrecognised deferred tax assets and liabilities is as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs6fc\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs6fd\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs6fe\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs6ff\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff72 fs2 fc3 sc0 ls5 ws2 gs700\">Unrecognised deferred tax assets<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs701\">T<span class=\"_ _2a\"></span>ax losses and tax credits<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs702\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs703\">8,572<span class=\"_ _64\"> </span><span class=\"ff70\">8,462<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs704\">Investments in subsidiaries</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs705\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs706\">1,661<span class=\"_ _64\"> </span><span class=\"ff70\">1,597<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs707\">Mineral rights</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs708\">3<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs709\">3,287<span class=\"_ _64\"> </span><span class=\"ff70\">2,781<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs70a\">Other deductible temporary differences</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs70b\">4<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs70c\">1,912<span class=\"_ _64\"> </span><span class=\"ff70\">1,777<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs70d\">T<span class=\"_ _2\"></span>otal unrecognised deferred tax assets<span class=\"_ _2cb\"> </span><span class=\"ff6f\">15,432<span class=\"_ _242\"> </span><span class=\"ff70\">14,617<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h4 ff72 fs2 fc3 sc0 ls5 ws2 gs70e\">Unrecognised deferred tax liabilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs70f\">Investments in subsidiaries</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs710\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs711\">2,179<span class=\"_ _64\"> </span><span class=\"ff70\">2,099<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs712\">T<span class=\"_ _2\"></span>otal unrecognised deferred tax liabilities<span class=\"_ _1f6\"> </span><span class=\"ff6f\">2,179<span class=\"_ _64\"> </span><span class=\"ff70\">2,099<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs713\">1 <span class=\"_ _42\"> </span>At 30 June 2023, the Group had income and capital tax losses with a tax benefit of US$5,709 million (2022: US$5,777 million) and tax credits of US$2,863 million (2022: </div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs714\">US$2,685 million), which are not recognised as deferred tax assets, because it is not probable that future taxable profits or capital gains will be available against which the </div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs715\">Group can utilise the benefits. </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs716\"> <span class=\"_ _1a0\"> </span>The gross amount of tax losses carried forward that have not been recognised is as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff72 fs3 fc3 sc0 ls5 ws2 gs717\">Y<span class=\"_ _2\"></span>ear of expiry<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs718\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs719\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs71a\">2022 </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs71b\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff72 fs2 fc3 sc0 ls5 ws2 gs71c\">Income tax losses<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs71d\">Not later than one year<span class=\"_ _170\"> </span><span class=\"ff6f\">22<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs71e\">Later than one year and not later than two years<span class=\"_ _1ee\"> </span><span class=\"ff6f\">5<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs71f\">Later than two years and not later than five years<span class=\"_ _176\"> </span><span class=\"ff6f\">47<span class=\"_ _a\"> </span><span class=\"ff70\">43<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs720\">Later than five years and not later than 10 years<span class=\"_ _238\"> </span><span class=\"ff6f\">549<span class=\"_ _25\"> </span><span class=\"ff70\">248<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs721\">Later than 10 years and not later than 20 years<span class=\"_ _2cc\"> </span><span class=\"ff6f\">1,317<span class=\"_ _64\"> </span></span>1,290<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs722\">Unlimited<span class=\"_ _2cd\"> </span><span class=\"ff6f\">4,889<span class=\"_ _64\"> </span></span>4,157<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs723\">6,829<span class=\"_ _64\"> </span><span class=\"ff70\">5,738<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff72 fs2 fc3 sc0 ls5 ws2 gs724\">Capital tax losses<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs725\">Not later than one year<span class=\"_ _2ce\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs726\">Later than two years and not later than five years<span class=\"_ _270\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _55\"> </span></span> \u2212<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs727\">Unlimited<span class=\"_ _2cf\"> </span><span class=\"ff6f\">13,870<span class=\"_ _242\"> </span></span>14,173<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs728\">Gross amount of tax losses not recognised<span class=\"_ _2d0\"> </span><span class=\"ff6f\">20,699<span class=\"_ _1a\"> </span><span class=\"ff70\">19,91<span class=\"_ _2\"></span>1<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs729\">T<span class=\"_ _2\"></span>ax effect of total losses not recognised<span class=\"_ _2d1\"> </span><span class=\"ff6f\">5,709<span class=\"_ _64\"> </span><span class=\"ff70\">5,777</span></span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs72a\"> <span class=\"_ _1a0\"> </span>Of the US$2,863 million of tax credits, US$2,405 million expires not later than 10 years (2022: US$2,129 million) and US$458 million expires later than 10 years and not later </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs72b\">than 20 years (2022: US$556 million).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs72c\">2 <span class=\"_ _42\"> </span>The Group has deferred tax assets and deferred tax liabilities associated with undistributed earnings of subsidiaries that have not been recognised because the Group is </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs72d\">able to control the timing of the reversal of the temporary differences and it is not probable that these differences will reverse in the foreseeable future. Where the Group has </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs72e\">undistributed earnings held by associates and joint interests, the deferred tax liability will be recognised as there is no ability to control the timing of the potential distributions.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs72f\">3 <span class=\"_ _42\"> </span>The Group has deductible temporary differences relating to mineral rights for which deferred tax assets have not been recognised because it is not probable that future capital </div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs730\">gains will be available against which the Group can utilise the benefits. The deductible temporary differences do not expire under current tax legislation.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs731\">4 <span class=\"_ _42\"> </span>The Group has other deductible temporary differences for which deferred tax assets have not been recognised because it is not probable that future taxable profits will be </div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs732\">available against which the Group can utilise the benefits. The deductible temporary differences do not expire under current tax legislation.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff6f fs7 fc7 sc0 ls5 ws2 gs734\">15 <span class=\"_ _47\"> </span>Closure and rehabilitation provisions<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs735\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs736\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs737\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs738\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs739\">At the beginning of the financial year<span class=\"_ _2d2\"> </span><span class=\"ff6f\">8,689<span class=\"_ _1a\"> </span><span class=\"ff70\">1<span class=\"_ _2\"></span>1,910<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs73a\">Capitalised amounts for operating sites:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs73b\">Change in estimate<span class=\"_ _2d3\"> </span><span class=\"ff6f\">510<span class=\"_ _64\"> </span></span>1,579<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs73c\">Exchange translation <span class=\"_ _2d4\"> </span><span class=\"ff6f\">(50)<span class=\"_ _95\"> </span></span>(694)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs73d\">Adjustments charged/(credited) to the income statement:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs73e\">Increases to existing and new provisions<span class=\"_ _13d\"> </span><span class=\"ff6f\">47<span class=\"_ _6f\"> </span></span>174<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs73f\">Exchange translation <span class=\"_ _2d5\"> </span><span class=\"ff6f\">(8)<span class=\"_ _b5\"> </span></span>(58)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs740\">Released during the year<span class=\"_ _2d6\"> </span><span class=\"ff6f\">(35)<span class=\"_ _b5\"> </span></span>(42)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs741\">Other adjustments to the provision:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs742\">Amortisation of discounting impacting net finance costs <span class=\"_ _29c\"> </span><span class=\"ff6f\">839<span class=\"_ _6f\"> </span><span class=\"ff70\">554<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs743\">Acquisition of subsidiaries and operations</div><div class=\"t m0 h42 ff70 fs21 fc3 sc0 ls5 ws2 gs744\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff6f fs2 fc3 sc0 ls5 ws2 gs745\">168<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs746\">Divestment and demerger of subsidiaries and operations <span class=\"_ _16b\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _12a\"> </span></span>(4,477)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs747\">Expenditure on closure and rehabilitation activities<span class=\"_ _139\"> </span><span class=\"ff6f\">(273)<span class=\"_ _e\"> </span></span>(316)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs748\">Exchange variations impacting foreign currency translation reserve<span class=\"_ _2d7\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _55\"> </span></span>(3)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs749\">Other movements<span class=\"_ _230\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _6d\"> </span></span>62<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff72 fs2 fc3 sc0 ls5 ws2 gs74a\">At the end of the financial year<span class=\"_ _2d8\"> </span><span class=\"ff6f\">9,887<span class=\"_ _64\"> </span><span class=\"ff70\">8,689<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs74b\">Comprising:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs74c\">Current<span class=\"_ _258\"> </span><span class=\"ff6f\">520<span class=\"_ _6f\"> </span></span>475<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs74d\">Non-current<span class=\"_ _237\"> </span><span class=\"ff6f\">9,367<span class=\"_ _140\"> </span></span>8,214<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs74e\">Operating sites<span class=\"_ _2d9\"> </span><span class=\"ff6f\">7,366<span class=\"_ _64\"> </span></span>6,198<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs74f\">Closed sites<span class=\"_ _2da\"> </span><span class=\"ff6f\">2,521<span class=\"_ _64\"> </span></span>2,491<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs750\">1 <span class=\"_ _42\"> </span>Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019<span class=\"_ _2\"></span> for more information.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff72 fs11 fc3 sc0 ls5 ws2 gs751\">Profile of closure and rehabilitation cash flows </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs752\">The table below indicates the estimated profile of the Group\u2019s closure and rehabilitation provisions. The profile reflects the undiscounted forecast cash </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs753\">flows that underpin the provisions. In some instances, the Group has an obligation to rehabilitate and maintain a closed site for an indefinite period. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs754\">For the purpose of this analysis, the cashflow period has been restricted to 100 years. </div><div class=\"t m0 h41 ff72 fs3 fc3 sc0 ls5 ws2 gs755\">Proportion of the Group\u2019<span class=\"_ _2\"></span>s undiscounted forecast cashflows<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs756\">2023 </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs757\">%<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs758\">2022 </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs759\">%<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs75a\">In one year or less <span class=\"_ _230\"> </span><span class=\"ff6f\"> 3<span class=\"_ _55\"> </span></span> 3<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs75b\">In more than one year but not more than two years<span class=\"_ _2db\"> </span><span class=\"ff6f\"> 4<span class=\"_ _55\"> </span></span> 3<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs75c\">In more than two years but not more than five years<span class=\"_ _2dc\"> </span><span class=\"ff6f\"> 8<span class=\"_ _55\"> </span><span class=\"ff70\"> 9<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs75d\">In more than five years but not more than ten years<span class=\"_ _270\"> </span><span class=\"ff6f\">14<span class=\"_ _6d\"> </span><span class=\"ff70\">15<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs75e\">In more than ten years<span class=\"_ _16e\"> </span><span class=\"ff6f\">71<span class=\"_ _6d\"> </span></span>70<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff6f fs2 fc3 sc0 ls5 ws2 gs75f\">T<span class=\"_ _2\"></span>otal<span class=\"_ _2dd\"> </span>100<span class=\"_ _25\"> </span><span class=\"ff70\">100<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs760\">The Group is required to close and rehabilitate sites and associated facilities at the end of or<span class=\"_ _2\"></span>, in some cases, during the course of production to a </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs761\">condition acceptable to the relevant authorities, as specified in licence requirements and the Group\u2019s closure performance requirements. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs762\">The key components of closure and rehabilitation activities are:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs763\">\u2013  <span class=\"ff70\">the removal of all unwanted infrastructure associated with an operation<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs764\">\u2013  <span class=\"ff70\">the return of disturbed areas to a safe, stable and self-sustaining condition, consistent with the agreed post-closure land use </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs765\">Recognition and measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs766\">Provisions for closure and rehabilitation are recognised by the Group when:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs767\">\u2013  <span class=\"ff70\">it has a present legal or constructive obligation as a result of past events<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs768\">\u2013  it is more likely than not that an outflow of resources will be required to settle the obligation </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs769\">\u2013  <span class=\"ff70\">the amount can be reliably estimated<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs76b\">Initial recognition and measurement<span class=\"_ _105\"> </span>Subsequent measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs76c\">Closure and rehabilitation provisions are </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs76d\">initially recognised when an environmental </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs76e\">disturbance first occurs. <span class=\"_ _2\"></span>The individual site </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs76f\">provisions are an estimate of the expected </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs770\">value of future cash <span class=\"_ _2\"></span>flows required to close </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs771\">the relevant site using current standards </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs772\">and techniques and taking into account risks </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs773\">and uncertainties. Individual site provisions </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs774\">are discounted to their present value using </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs775\">currency specific discount rates <span class=\"_ _2\"></span>aligned to </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs776\">the estimated timing of <span class=\"_ _2\"></span>cash outflows. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs777\">When provisions for closure and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs778\">rehabilitation are initially recognised, the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs779\">corresponding cost is capitalised as an </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs77a\">asset, representing part of the cost of </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs77b\">acquiring the future economic <span class=\"_ _2\"></span>benefits </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs77c\">of the operation.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs77d\">The closure and rehabilitation asset, recognised within property<span class=\"_ _2\"></span>, plant and equipment, is depreciated over </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs77e\">the life of the operations. The value of the provision is progressively increased over time as the ef<span class=\"_ _2\"></span>fect of </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs77f\">discounting unwinds, resulting in <span class=\"_ _2\"></span>an expense recognised in net <span class=\"_ _2\"></span>finance costs.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs780\">The closure and rehabilitation provision is reviewed at each reporting date to assess if the estimate continues </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs781\">to reflect the best <span class=\"_ _2\"></span>estimate of the obligation. If <span class=\"_ _2\"></span>necessary<span class=\"_ _2\"></span>, the provision <span class=\"_ _2\"></span>is remeasured to account for <span class=\"_ _2\"></span>factors </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs782\">such as:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs783\">\u2013  <span class=\"ff70 ws2\">additional disturbance during the period<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs784\">\u2013  <span class=\"ff70 ws2\">revisions to estimated reserves, resources and lives of operations including any changes to expected<span class=\"_ _0\"></span> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs785\">operating lives arising from the Group\u2019s latest assessment of the potential impacts of climate change and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs786\">the transition to a low-carbon economy<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs787\">\u2013  <span class=\"ff70 ws2\">developments in technology<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs788\">\u2013  <span class=\"ff70 ws2\">changes to regulatory requirements and environmental management strategies<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs789\">\u2013  changes in the estimated extent and costs <span class=\"_ _2\"></span>of anticipated activities, including the <span class=\"_ _2\"></span>effects of inflation </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs78a\">and movements in foreign exchange rates<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs78b\">\u2013  <span class=\"ff70 ws2\">movements in interest rates affecting the discount rate applied<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs78c\">Changes to the closure and rehabilitation estimate for operating sites are added to, or deducted from, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs78d\">the related asset and amortised on a prospective basis over the remaining life of the operation, generally </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs78e\">applying the units of production method.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs78f\">Costs arising from unforeseen circumstances, such as the contamination caused by unplanned discharges, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs790\">are recognised as an expense and liability when the event gives rise to an obligation that is probable and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs791\">capable of reliable estimation.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs792\">Closed sites<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs793\">Where future economic benefits are no longer expected to be derived through operation, changes to the associated closure and remediation costs are </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs794\">charged to the income statement in the period identified. This amounted to US$4 million in the year ended 30 June 2023 (2022: US$74 million; 2021: </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs795\">US$483 million).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs796\">Key estimates<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs797\">Closure cost estimates are generally based on conceptual level studies </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs798\">early in the operating life of an asset with more detailed studies and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs799\">planning performed as closure risks (including those related to climate </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs79a\">change) are identified and/or as an asset, or parts thereof, near closure. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs79b\">As such, the recognition and measurement of closure and rehabilitation </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs79c\">provisions requires the use of significant estimates and assumptions, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs79d\">including, but not limited to:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs79e\">\u2013  <span class=\"ff70 ws2\">the extent (due to legal or constructive obligations) of potential activities<span class=\"_ _0\"></span> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs79f\">required for the removal of infrastructure, decharacterisation of tailings </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7a0\">storage facilities and rehabilitation activities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs7a1\">\u2013  <span class=\"ff70 ws2\">costs associated with future closure activities<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs7a2\">\u2013  <span class=\"ff70 ws2\">the extent and period of post-closure monitoring and maintenance,<span class=\"_ _0\"></span> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7a3\">including water management<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs7a4\">\u2013  <span class=\"ff70 ws2\">applicable discount rates<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs7a5\">\u2013  the timing of cash flows and ultimate <span class=\"_ _2\"></span>closure of operations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7a6\">The extent, cost and timing of future closure activities may also be </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7a7\">impacted by the potential physical impacts of climate change and the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7a8\">transition to a low-carbon economy<span class=\"_ _2\"></span>. Further detail is provided in note 16 </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7a9\">\u2018Climate Change\u2019. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7aa\">Estimates for post-closure monitoring and maintenance reflect the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7ab\">Group\u2019s strategies for individual sites, which may include possible </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7ac\">relinquishment. The period of monitoring and maintenance included in </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7ad\">the provision requires judgement and considers regulatory and licencing </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7ae\">requirements, the outcomes of studies and management\u2019s current </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7af\">assessment of stakeholder expectations. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7b0\">While progressive closure is performed across a number of operations, </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs7b1\">significant activities are generally <span class=\"_ _2\"></span>undertaken at the end of <span class=\"_ _2\"></span>the production </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7b2\">life at the individual sites, the estimated timing of which is informed by </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7b3\">the Group\u2019s current assumptions relating to demand for commodities and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7b4\">carbon pricing, and their impact on the Group\u2019s long-term price forecasts.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7b5\">Approximately 51 per cent (2022: 48 per cent) of the Group\u2019s total </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs7b6\">undiscounted forecast cashflows are <span class=\"_ _2\"></span>expected to be incurred after <span class=\"_ _2\"></span>more </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs7b7\">than 30 years, reflecting <span class=\"_ _2\"></span>the long-lived nature of many <span class=\"_ _2\"></span>of the Group\u2019s </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7b8\">operations which have remaining production lives ranging from 1-103 </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7b9\">years (2022: 2-104 years). The discount rates applied to the Group\u2019<span class=\"_ _2\"></span>s </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7ba\">closure and rehabilitation provisions are determined by reference to the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs7bb\">currency of the closure <span class=\"_ _2\"></span>cash flows, the period over <span class=\"_ _2\"></span>which the cash flows </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7bc\">will be incurred and prevailing market interest rates (where available). </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7bd\">The Group continues to monitor current market conditions with no change </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7be\">made to the Group\u2019s discount rates in the current year<span class=\"_ _2\"></span>. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 lse3 ws123 gs7bf\">While the closure and <span class=\"_ _0\"></span>rehabilitation provisions reflect management\u2019s </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 lse3 ws2 gs7c0\">best estimates based on current knowledge and information, further </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 lse3 ws2 gs7c1\">studies, trials and detailed analysis of relevant knowledge and resultant </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 lse3 ws2 gs7c2\">closure activities for individual assets continue to be performed </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 lse3 ws2 gs7c3\">throughout the life of asset. Such studies and analysis can impact the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 lse3 ws2 gs7c4\">estimated costs of closure activities. Estimates can also be impacted by </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 lse3 ws2 gs7c5\">the emergence of new closure and rehabilitation techniques, changes </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 lse3 ws2 gs7c6\">in regulatory requirements and stakeholder expectations for closure </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 lse3 ws2 gs7c7\">(including costs associated with equitable transition), development of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 lse3 ws2 gs7c8\">new technologies, risks relating to climate change and the transition </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 lse3 ws2 gs7c9\">to a low-carbon economy<span class=\"_ _2\"></span>, and experience at other operations. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 lse3 ws2 gs7ca\">These uncertainties may result in future actual expenditure differing </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 lse3 ws2 gs7cb\">from the amounts currently provided for in the balance sheet.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls46 ws4b gs7cc\">Sensitivity<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7cd\">A<span class=\"_ _2\"></span> 0.5 per cent increase in the discount rates applied at 30 June 2023 </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7ce\">would result in a decrease to the closure and rehabilitation provision </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7cf\">of approximately US$758 million, a decrease in property<span class=\"_ _2\"></span>, plant and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7d0\">equipment of approximately US$568 million in relation to operating sites </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7d1\">and an income statement credit of approximately US$190 million in respect </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7d2\">of closed sites. In addition, the change would result in a decrease of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs7d3\">approximately US$44 million to depreciation expense and a US$26 million </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs7d4\">increment in net finance <span class=\"_ _2\"></span>costs for the year ending <span class=\"_ _2\"></span>30 June 2024.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7d5\">Given the long-lived nature of the majority of the Group\u2019s assets, the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7d6\">majority of final closure activities are generally not expected to occur for </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7d7\">a significant period of time. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7d8\">However<span class=\"_ _2\"></span>, a one-year acceleration in forecast cash flows of the Group\u2019s </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7d9\">closure and rehabilitation provisions, in isolation, would result in an </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7da\">increase to the provision of approximately US$209 million, an increase in </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7db\">property<span class=\"_ _2\"></span>, plant and equipment of US$148 million in relation to operating </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7dc\">sites and an income statement charge of US$61 million in respect of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7dd\">closed sites.<span class=\"_ _39c\"> </span> </div><div class=\"t m0 hb ff6f fs7 fc7 sc0 ls5 ws2 gs7df\">16 <span class=\"_ _47\"> </span>Climate change<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7e0\">The Group recognises that warming of the climate is unequivocal, the human influence is clear and physical impacts are unavoidable. Identifying, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7e1\">monitoring and assessing the actual and potential impacts of climate change is complex and the Group continues to develop its assessment of the actual </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7e2\">and potential financial impacts of climate-related risks and opportunities, including the transition to a low-carbon economy and physical risk impacts. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7e3\">The Group\u2019s current climate change strategy focuses on:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7e4\">\u2013  <span class=\"ff70\">building a portfolio to support the megatrends shaping our world, including future-facing commodities (copper, nickel and potash) and steelmaking </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7e5\">materials (iron ore and metallurgical coal)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7e6\">\u2013  <span class=\"ff70\">reducing operational greenhouse gas (GHG) emissions<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7e7\">\u2013  <span class=\"ff70\">investing in low GHG emissions technologies<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7e8\">\u2013  <span class=\"ff70\">supporting GHG emissions reductions in our value chain and promoting product stewardship<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7e9\">\u2013  <span class=\"ff70\">managing climate-related risks (threats and opportunities)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7ea\">\u2013  <span class=\"ff70\">working with others to enhance the global policy and market response </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7eb\">Areas of the financial statements that may potentially be impacted in connection with this strategy throughout the value creation and delivery cycle of the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7ec\">Group\u2019s operations, include:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs7ed\">Phase<span class=\"_ _2de\"> </span><span class=\"ff72\">Areas of potential financial statement impact<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff70 fs5 fc3 sc0 ls5 ws2 gs7ee\">Exploration and acquisition<span class=\"_ _58\"> </span><span class=\"ff71\">\u2013 <span class=\"_ _53\"> </span></span>Financial impact of portfolio decisions<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7ef\">Development and mining / <span class=\"ff70\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7f0\">Process and logistics<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7f1\">\u2013  <span class=\"ff70\">Impact of transition risks (threats and opportunities) on asset carrying values<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7f2\">\u2013  <span class=\"ff70\">Physical risk impacts on asset carrying values<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7f3\">\u2013  <span class=\"ff70\">Acquisition of carbon credits, and application of carbon pricing assumptions<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7f4\">\u2013  <span class=\"ff70\">Useful economic lives of property<span class=\"_ _2\"></span>, plant and equipment<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7f5\">\u2013  <span class=\"ff70\">Expenditure on operational decarbonisation<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7f6\">\u2013  <span class=\"ff70\">Expenditure to support value chain decarbonisation<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff70 fs5 fc3 sc0 ls5 ws2 gs7f7\">Sales, marketing and procurement<span class=\"_ _61\"> </span><span class=\"ff71\">\u2013  </span>Key transition materials and future-facing commodities and the revenue they generate<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7f8\">\u2013  <span class=\"ff70\">Expenditure to support value chain decarbonisation </span></div><div class=\"t m0 h9 ff70 fs5 fc3 sc0 ls5 ws2 gs7f9\">Closure and rehabilitation<span class=\"_ _26\"> </span><span class=\"ff71\">\u2013  </span>Physical risk impacts on asset carrying values<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7fa\">\u2013  <span class=\"ff70\">Timing, scope and expected cost of closure and rehabilitation activities<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7fb\">At the date of issue of these Financial Statements, indicators show the appropriate measures are not in place globally to drive decarbonisation at the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7fc\">pace or scale required for the aims of the Paris <span class=\"_ _2\"></span>Agreement to be achieved as the most likely future outcome. <span class=\"_ _2\"></span>As such, the significant judgements and key </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7fd\">estimates used in the preparation of these financial statements reflect the Group\u2019s current operational planning cases (described below) which are not </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs7fe\">currently aligned with a 1.5\u00b0C temperature outcome.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs7ff\">However<span class=\"_ _2\"></span>, while not the basis of preparation of these financial statements, the Group continues to assess the potential financial statement impacts of the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs800\">1.5\u00b0C temperature outcome goal of the Paris <span class=\"_ _2\"></span>Agreement under the Group\u2019s 1.5\u00b0C scenario</div><div class=\"t m0 h20 ff70 fs12 fc3 sc0 ls5 ws2 gs801\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs802\">.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs803\">Future changes to the Group\u2019s climate change strategy or global decarbonisation signposts may impact the Group\u2019s significant judgements and key </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs804\">estimates, and result in material changes to financial results and the carrying values of certain assets and liabilities in future reporting periods. </div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs805\">Financial impact of portfolio decisions<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs806\">During FY2023, the Group completed the acquisition of OZ Minerals Limited (OZL) and announced the proposed divestment of its interest in the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs807\">Daunia and Blackwater lower-quality metallurgical coal mines, currently part of the BHP Mitsubishi <span class=\"_ _2\"></span>Alliance (BMA). Further information in respect of the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs808\">acquisition of OZL<span class=\"_ _2\"></span> is included in note 29 \u2018Business combinations\u2019. Given the timing of the acquisition, the OZL assets will be incorporated into the Group\u2019<span class=\"_ _2\"></span>s </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs809\">climate-related assessments, and associated disclosures, in FY2024 as integration of the business continues. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs80a\">These activities support the continued reshaping of the Group\u2019s portfolio to focus on future-facing commodities, iron ore and higher quality metallurgical </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs80b\">coal. They follow the completion, in FY2022, of the merger of the Group\u2019<span class=\"_ _2\"></span>s Petroleum business with Woodside and the divestment of the Group\u2019s interests </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs80c\">in BHP Mitsui Coal Pty Ltd (BMC) and the Cerrej\u00f3n non-operated energy coal joint venture. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs80d\">Also in FY2022, the Group announced that it would retain New South W<span class=\"_ _2\"></span>ales Energy Coal (NSWEC) in its portfolio, seek the relevant approvals to </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs80e\">continue mining beyond the current consent that expires at the end of FY2026 and proceed with a managed process to cease mining at the asset by the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs80f\">end of FY2030. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs810\">Following impairments recognised in previous periods, the net carrying value of NSWEC at 30 June 2023 is approximately negative US$220 million </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs811\">comprising property<span class=\"_ _2\"></span>, plant and equipment (PP&amp;E) of approximately US$530 million and closure provisions and other liabilities of approximately </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs812\">US$750 million. <span class=\"_ _2\"></span>As at 30 June 2023, the potential exposure to further impairment for NSWEC is limited to the book value of PP&amp;E of US$530 million, with </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs813\">the forecast cash flows over the proposed operating period supporting the current carrying value. Further<span class=\"_ _2\"></span>, the useful lives of NSWEC PP&amp;E do not exceed </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs814\">the remaining proposed operating period. </div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs815\">Impact of transition risks (threats and opportunities) on asset carrying values </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs816\">Significant judgements and key estimates in relation to the preparation of the Financial Statements are impacted by the Group\u2019s current assessment of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs817\">the range of economic and climate-related conditions that could exist in the world\u2019s transition to a low-carbon economy<span class=\"_ _2a\"></span>, considering the current trajectory </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs818\">of society and the global economy as a whole.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs819\">For example, demand for the Group\u2019s commodities may decrease due to policy<span class=\"_ _2a\"></span>, regulatory (including carbon pricing mechanisms), legal, technological, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs81a\">market or societal responses to climate change, resulting in a proportion of a cash generating unit\u2019s (CGU) reserves becoming incapable of extraction in </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs81b\">an economically viable fashion.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs81c\">1 <span class=\"_ _42\"> </span> <span class=\"_ _50\"></span>This scenario requires steep global annual emissions reduction, sustained for decades, to stay within a 1.5\u00b0C carbon budget. 1.5\u00b0C is above pre-industrial levels. For more </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs81d\">information about the assumptions, outputs and limitations of our 1.5\u00b0C scenario refer to the BHP Climate Change Report 2020 available at <span class=\"fc2\">bhp.com</span>. The Group is preparing </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs81e\">an updated 1.5\u00b0C scenario in FY2024.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs820\">T<span class=\"_ _2a\"></span>o support strategic decision making, the Group develops a number of divergent climate scenarios and pathways. In FY2023, the Group\u2019s One Energy </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs821\">View<span class=\"_ _2\"></span>, being the Group\u2019<span class=\"_ _2\"></span>s current estimates of the most likely future states for the global economy and associated sub-systems, was updated to reflect </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs822\">three different pathways under which most developed economies would reach net zero around 2050, with other large economies reaching net zero in </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs823\">2060 and 2070. While the global gross domestic product assumptions and the pace and drivers of decarbonisation vary across the pathways, each </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs824\">pathway results in a global average temperature increase of around 2\u00b0C by 2100.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls1c ws21 gs825\">The Group <span class=\"_ _2\"></span>uses <span class=\"_ _2\"></span>the One <span class=\"_ _2\"></span>Energy V<span class=\"_ _2\"></span>iew pathways <span class=\"_ _2\"></span>as inputs <span class=\"_ _2\"></span>to the <span class=\"_ _2\"></span>Group\u2019s <span class=\"_ _2\"></span>operational <span class=\"_ _2\"></span>planning cases <span class=\"_ _2\"></span>as they <span class=\"_ _2\"></span>reflect the <span class=\"_ _2\"></span>Group\u2019s <span class=\"_ _2\"></span>current best <span class=\"_ _2\"></span>estimates <span class=\"_ _2\"></span>of the <span class=\"_ _2\"></span>most<span class=\"_ _0\"></span> <span class=\"_ _2\"></span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls1c ws2 gs826\">likely range of future states for the global economy and associated sub-systems. These pathways inform updates to the Group\u2019<span class=\"_ _2\"></span>s commodity supply and demand<span class=\"_ _0\"></span> </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls1c ws2 gs827\">outlooks and are used, in conjunction with other market sources of information, to determine the Group\u2019s short and long-term price outlooks. Other sources of </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls1c ws21 gs828\">information include <span class=\"_ _2\"></span>commodity <span class=\"_ _2\"></span>price forward <span class=\"_ _2\"></span>curves, consensus <span class=\"_ _2\"></span>price outlooks <span class=\"_ _2\"></span>and <span class=\"_ _2\"></span>commodity specific <span class=\"_ _2\"></span>price outlooks <span class=\"_ _2\"></span>sourced from <span class=\"_ _2\"></span>industry <span class=\"_ _2\"></span>analysts.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs829\">Given the complexity and inherent uncertainty of climate modelling, these pathways are reviewed periodically to reflect new information, with a process in </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs82a\">place to assess the need to update internal long-term price outlooks for developments in the periods between pathway updates. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs82b\">The Group reflects the operational planning cases and associated price outlooks in the internal valuations used as the basis for the Group\u2019s </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs82c\">impairment assessments. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs82d\">The discount rate used in the internal valuations reflects a real post-tax weighted average cost of capital (WACC), including country and state risk premia </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs82e\">where appropriate, and ranges from 7.0 per cent to 9.5 per cent across the Group (FY2022: 6.0 per cent to 8.5 per cent). Cash flow forecasts used as the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs82f\">basis for impairment testing include asset specific risks, including climate-related risks such as operational interruptions as a result of physical climate-<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs830\">related risks, and therefore the Group does not include a separate climate-related risk adjustment in the Group\u2019s W<span class=\"_ _2\"></span>ACC.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs831\">Physical risk impacts on asset carrying values<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs832\">The Group\u2019s operations are exposed to physical climate-related risks. In FY2023, the Group progressed impact evaluations of physical climate-related </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs833\">risks to better understand the potential impacts to site operations, safety<span class=\"_ _2\"></span>, productivity and cost, with these assessments to continue in FY2024.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs834\">The Group\u2019s consideration of potential physical climate-related risk impacts when developing the Group\u2019s operating plans, including factors such as </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs835\">operational interruptions caused by extreme weather events, therefore considers only the Group\u2019s current best estimates of the potential financial impacts </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs836\">of certain climate-related physical risks. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs837\">Given the complexity of physical risk modelling and the ongoing nature of the Group\u2019s physical risk assessment process, the identification of additional </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs838\">risks and/or the detailed development of the Group\u2019s response may result in material changes to financial results and the carrying values of assets and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs839\">liabilities in future reporting periods.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs83a\">Acquisition of carbon credits and application of carbon pricing assumptions<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs83b\">The Group\u2019s carbon credits and of<span class=\"_ _2\"></span>fsetting strategy is currently being managed at a consolidated Group level. However<span class=\"_ _2\"></span>, individual investment decisions </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs83c\">and asset valuations used for the purposes of impairment testing, consider carbon price assumptions for major Group operational, competitor and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs83d\">customer countries by applying a carbon price to estimated unmitigated Scopes 1 and 2 GHG emissions over the life of the respective operation. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs83e\">In determining the Group\u2019s forecast, factors including a country\u2019<span class=\"_ _2\"></span>s current and announced climate policies, targets and societal factors, such as public </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs83f\">acceptance and demographics, are considered. <span class=\"_ _2\"></span>As at the date of these Financial Statements, the carbon price used in asset valuations reflects the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs840\">following ranges:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs841\">US$ real (January 2022) per tCO</div><div class=\"t m0 h137 ff6f fsfe fc3 sc0 ls5 ws2 gs842\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs843\">FY2030 </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs844\">Low<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs845\">FY2030 </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs846\">High<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs847\">FY2050 </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs848\">Low<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs849\">FY2050 </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs84a\">High<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs84b\">Australia<span class=\"_ _2a1\"> </span>25<span class=\"_ _a\"> </span>75<span class=\"_ _6f\"> </span>150<span class=\"_ _25\"> </span>225<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff71 fs2 fc3 sc0 ls5 ws2 gs84c\">Brazil<span class=\"_ _2df\"> </span><span class=\"ff70\">5<span class=\"_ _a\"> </span>50<span class=\"_ _6f\"> </span>125<span class=\"_ _25\"> </span>200<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs84d\">Chile<span class=\"_ _162\"> </span>8<span class=\"_ _a\"> </span>41<span class=\"_ _25\"> </span>150<span class=\"_ _6f\"> </span>225<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs84e\">Canada<span class=\"_ _26c\"> </span>65<span class=\"_ _25\"> </span>102<span class=\"_ _6f\"> </span>200<span class=\"_ _25\"> </span>225<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff70 fs2 fc3 sc0 ls5 ws2 gs84f\">Key customer countries<span class=\"_ _193\"> </span><span class=\"ff71\">\u2212<span class=\"_ _6f\"> </span></span>175<span class=\"_ _6d\"> </span>25<span class=\"_ _25\"> </span>250<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs850\">The Group acquires carbon credits for the purposes of both compliance and possible voluntary surrender or retirement to achieve the Group\u2019s net zero </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs851\">operational GHG emissions long-term goal by CY2050. The Group may also sell to optimise carbon credits depending on internal use requirements or </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs852\">originate carbon credits through project development or direct investment.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs853\">Expenditure on carbon credits during FY2023 amounted to approximately US$15 million. The Group did not voluntarily surrender or retire any carbon </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs854\">credits during FY2023.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs855\">From FY2024, the Group will be subject to the reforms made to <span class=\"_ _2\"></span>Australia\u2019s Safeguard Mechanism in FY2023 which, in ef<span class=\"_ _2\"></span>fect, levy a carbon price for </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs856\">large facilities by requiring the surrender of eligible credits when their Scope 1 emissions exceed a progressively declining legislated limit (known as a </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs857\">baseline). <span class=\"_ _2\"></span>As such, in future reporting periods, the Group may recognise liabilities where an obligation to purchase eligible carbon credits exists and/or </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs858\">intangible assets for carbon credits acquired or generated to meet those obligations.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs859\">Useful economic lives of property<span class=\"_ _2a\"></span>, plant and equipment<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs85a\">The determination of useful lives of the Group\u2019s PP&amp;E requires judgement, including consideration of the Group\u2019s climate change strategy<span class=\"_ _2a\"></span>, targets and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs85b\">goals, decarbonisation plans and the possible impact of transition risks on demand for the Group\u2019s commodities. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs85c\">Useful lives are reviewed each reporting period, including to ensure they do not exceed the remaining expected operating life of the operation in which </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs85d\">they are utilised, and are updated as required. The remaining lives of the Group\u2019s operations reflect the Group\u2019<span class=\"_ _2\"></span>s operational planning cases and their </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs85e\">underlying climate-related assumptions. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs85f\">A<span class=\"_ _2\"></span> key component of the Group\u2019s operational decarbonisation strategy is the displacement of diesel within the Group\u2019<span class=\"_ _2\"></span>s operations, particularly the haul </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs860\">truck fleet. The Group is supporting the development of new equipment by original equipment manufacturers, including entering into partnerships focused </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs861\">on the development and trialling of electrical locomotives and haul trucks. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls46 ws2 gs862\">While technical and commercial development of the technology needed is progressing, the Group\u2019s operating plans generally assume replacement of haul </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs863\">trucks, and other diesel <span class=\"_ _2\"></span>powered equipment, at the end <span class=\"_ _2\"></span>of their useful lives in <span class=\"_ _2\"></span>line with the Group\u2019s <span class=\"_ _2\"></span>regular fleet renewal programs. For <span class=\"_ _2\"></span>example, a significant </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs864\">proportion of the Group\u2019<span class=\"_ _2\"></span>s current W<span class=\"_ _2\"></span>AIO mining fleet is <span class=\"_ _2\"></span>due for replacement prior to <span class=\"_ _2\"></span>the expected availability of battery <span class=\"_ _2\"></span>electric vehicle solutions. <span class=\"_ _2\"></span>As such, <span class=\"_ _2\"></span>the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls46 ws4b gs865\">Group\u2019s decarbonisation <span class=\"_ _2\"></span>plans have not had a <span class=\"_ _2\"></span>material impact on the estimated remaining <span class=\"_ _2\"></span>useful lives of the Group\u2019<span class=\"_ _2\"></span>s existing fleet of <span class=\"_ _2\"></span>assets in FY2023.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff72 fs11 fc3 sc0 ls5 ws2 gs867\">Expenditure on operational decarbonisation<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs868\">The Group has set a target to reduce its operational GHG emissions </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs869\">(Scopes 1 and 2 from our operated assets) by at least 30 per cent from the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs86a\">Group\u2019s FY2020 baseline levels by FY2030 and a goal to achieve net zero </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs86b\">operational GHG emissions by CY2050.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs86c\">Given the timing of the OZ Minerals Limited acquisition, the Group plans </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs86d\">to update the baseline for both the Group\u2019s medium-term target and long-<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs86e\">term goal in FY2024.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs86f\">The Group\u2019s operational decarbonisation activities during FY2023 largely </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs870\">focused on the transition of the Group\u2019s electricity supply to renewable </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs871\">sources. The Group also continued to progress projects in relation </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs872\">to displacement of diesel and managing fugitive methane, however </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs873\">expenditure in these areas is expected to increase towards the second half </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs874\">of the decade. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs875\">A<span class=\"_ _2\"></span> significant proportion of the Group\u2019s renewable electricity is currently </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs876\">sourced through power purchase agreements and judgement is required in </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs877\">determining the appropriate accounting treatment of such arrangements. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs878\">Depending on the specific terms and conditions, power purchase </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs879\">agreements may be recognised as:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs87a\">\u2013  <span class=\"ff70\">an expense when incurred<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs87b\">\u2013  a financial derivative; or </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs87c\">\u2013  <span class=\"ff70\">a lease liability<span class=\"_ _2\"></span>, with an associated right of use asset </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs87d\">At 30 June 2023, the Group recognised derivatives associated with </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs87e\">renewable power purchase agreements (including those signed </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs87f\">arrangements in which supply will commence in future periods) with a </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs880\">fair value of approximately US$50 million. No significant leases have </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs881\">been recognised by the Group in relation to renewable power purchase </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs882\">agreements at 30 June 2023.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs883\">Capital expenditure associated with renewable power purchase </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs884\">agreements is generally limited and, given the early stage of development </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs885\">of diesel displacement and management of fugitive methane, capital </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs886\">expenditure on decarbonisation in FY2023 was not material. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs887\">Capital and operating expenditures associated with projects aimed at </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs888\">contributing to the achievement of the Group\u2019s operational GHG emissions </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs889\">medium-term target and long-term goal have been incorporated into </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs88a\">the estimated future cash flows of the Group\u2019s assets. <span class=\"_ _2\"></span>These cash flow </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs88b\">estimates form the basis of the Group\u2019s impairment assessments as </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs88c\">outlined in further detail in note 13 \u2018Impairment of non-current assets\u2019. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs88d\">Of the total future capital expenditure on operational decarbonisation, the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs88e\">Group expects to spend around US$4 billion (nominal terms) by FY2030, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs88f\">with the majority of decarbonisation capital over this period being spent on </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs890\">diesel-displacement projects</div><div class=\"t m0 h20 ff70 fs12 fc3 sc0 ls5 ws2 gs891\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs892\">. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs893\">Many of the projects planned to commence before FY2030 are likely to </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs894\">extend beyond the Group\u2019s medium-term target period, and are expected </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs895\">to make a substantial contribution towards the Group\u2019s long-term goal of </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs896\">net zero operational GHG emissions by CY2050. Significant expenditure </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs897\">on fleet renewal at certain assets, for example Olympic Dam, is expected </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs898\">to occur after FY2030.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs899\">As the Group\u2019s climate response is further integrated into business-<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs89a\">as-usual planning, the spending on climate initiatives is expected </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs89b\">to increasingly form part of ordinary course business expenditures. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs89c\">Any change to the Group\u2019s climate change strategy could impact the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs89d\">expected level of expenditure on operational decarbonisation and the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs89e\">associated financial statement significant judgements and key estimates.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff72 fs7 fc7 sc0 ls5 ws2 gs89f\">Capex spend FY24 \u2013 FY30 by asset<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1c ff6f fse fc7 sc0 ls5 ws2 gs8a0\">2</div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 wsf1 gs8a1\"> <span class=\"_ _19f\"> </span> WAIO <span class=\"_ _2e0\"> </span>40%</div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs8a2\"> <span class=\"_ _42\"> </span>Escondida<span class=\"ws124\"> 31%</span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs8a3\"> <span class=\"_ _42\"> </span>BMA<span class=\"_ _2\"></span><span class=\"ws125\"> 12%</span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs8a4\"> <span class=\"_ _42\"> </span>Pampa Norte and Potash<span class=\"lsd3 ws126\"> 11<span class=\"_ _0\"></span>%</span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs8a5\"> <span class=\"_ _42\"> </span>Olympic Dam and Nickel W<span class=\"_ _2\"></span>est<span class=\"ws127\"> 6%<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h1f ff72 fs11 fc3 sc0 ls5 ws2 gs8a6\">Expenditure to support value chain decarbonisation<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8a7\">The Group continues to invest, including in partnership with others, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8a8\">in potential GHG emissions reduction opportunities in its value chain </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8a9\">through technology innovation and development to support reductions to </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8aa\">its total reported Scope 3 emissions inventory<span class=\"_ _2\"></span>, with a particular focus on </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8ab\">steelmaking and maritime emissions. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8ac\">However<span class=\"_ _2\"></span>, while we seek to influence reduction opportunities, Scope 3 </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8ad\">emissions occur outside of our direct control. Reduction pathways are </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8ae\">dependent on the development, and upstream or downstream deployment </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8af\">of, solutions and/or supportive policy<span class=\"_ _2\"></span>. Where possible, the financial </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8b0\">impact of the Group\u2019s activities in support of the development of Scope 3 </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8b1\">reduction pathways is reflected in the financial statements. For example, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8b2\">the Group recognised additional lease liabilities, and associated right </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8b3\">of use assets, of US$90 million during FY2023 when chartering of the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8b4\">Group\u2019s new dual-fuelled LNG vessels. Further detail of the Group\u2019<span class=\"_ _2\"></span>s leases </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8b5\">is provided in note 22 \u2018Leases\u2019. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8b6\">It is, however<span class=\"_ _2\"></span>, currently not possible to reliably estimate or measure the full </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8b7\">potential financial statement impacts of the Group\u2019s pursuit of its Scope 3 </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8b8\">goals and targets. </div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs8b9\">Key transition materials and future-facing commodities, and the </div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs8ba\">revenue they generate<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8bb\">There is no agreed or established approach to defining revenue from </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8bc\">commodities that are key to the transition to a low-carbon economy<span class=\"_ _2\"></span>. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8bd\">The investor-led initiative Climate <span class=\"_ _2\"></span>Action 100+ is developing a Diversified </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8be\">Mining Net Zero Standard with the draft Standard defining key transition </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8bf\">materials. The FTSE Green Revenues Classification System is a taxonomy </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8c0\">designed by FTSE Russell to better identify products and services </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8c1\">contributing to the transition to a low-carbon economy<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8c2\">Applying the Climate <span class=\"_ _2\"></span>Action 100+ draft Standard definitions and the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8c3\">FTSE Russel taxonomy would result in the Group classifying copper<span class=\"_ _2\"></span>, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8c4\">nickel and uranium as key transition materials. FY2023 revenue for these </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8c5\">commodities was US$14.9 billion, US$1.9 billion (comprised of Battery-<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8c6\">suitable</div><div class=\"t m0 h20 ff70 fs12 fc3 sc0 ls5 ws2 gs8c7\">3</div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8c8\"> US$1.0 billion and Other US$0.9 billion) and US$0.4 billion </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8c9\">respectively<span class=\"_ _2\"></span>. (FY2022: US$16.0 billion, US$1.7 billion and US$0.2 billion, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8ca\">respectively).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs8cb\">2 <span class=\"_ _42\"> </span>Based on latest business plans and excluding recently acquired OZL assets. </div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs8cc\">In respect of diesel-displacement, amounts included in the US$4 billion reflect </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs8cd\">incremental estimated spend above internal combustion engine replacement costs </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs8ce\">and supporting site infrastructure. </div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs8cf\">3 <span class=\"_ _42\"> </span>Battery-suitable nickel is defined as nickel briquettes, nickel powder and nickel </div><div class=\"t m0 h1a ff71 fs3 fc3 sc0 ls5 ws2 gs8d0\">sulphate. It does not include off-specification nickel metal. Calculated based on </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs8d1\">gross revenue from battery suitable nickel multiplied by percentage of BHP\u2019s </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs8d2\">sales of battery-suitable nickel, as applicable to battery material suppliers. </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs8d3\">Where a customer\u2019s planned end use is not known with certainty to be for battery </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs8d4\">supply<span class=\"_ _2\"></span>, assumptions of usage have been made using historical nickel usage for </div><div class=\"t m0 h5 ff70 fs3 fc3 sc0 ls5 ws2 gs8d5\">those customers.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff72 fs11 fc3 sc0 ls5 ws2 gs8d7\">Timing and expected cost of closure and rehabilitation activities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8d8\">The extent, cost and timing of the Group\u2019s future closure activities may </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8d9\">be impacted by potential physical climate-related impacts. In estimating </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8da\">the potential cost of closure activities, the Group considers factors such </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8db\">as long-term weather outlooks, for example forecast changes in rainfall </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8dc\">patterns. Closure cost estimates also consider the impact of the Group\u2019s </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8dd\">climate change strategy on the costs and timing of performing closure </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8de\">activities and the impact of new technology where appropriately developed </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8df\">and tested. For example, closure cost estimates largely continue to reflect </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8e0\">the use of existing fuel sources for the Group\u2019s equipment while the Group </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8e1\">continues to invest in the development of alternative fuel sources and </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8e2\">fleet electrification.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8e3\">The estimated cost of closure activities includes management\u2019s current </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8e4\">best estimate in relation to post-closure monitoring and maintenance, </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8e5\">which may be required for significant periods beyond the completion of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8e6\">other closure activities and is therefore exposed to potential long-term </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8e7\">climate-related impacts. While reflecting management\u2019s current best </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8e8\">estimate, the cost of post-closure monitoring and maintenance may </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8e9\">change in future reporting periods as the understanding of, and potential </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8ea\">long-term impacts from, climate change continue to evolve.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8eb\">Given the long-lived nature of the majority of the Group\u2019s assets, the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8ec\">majority of final closure activities are not expected to occur for a significant </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8ed\">period of time. However<span class=\"_ _2\"></span>, acknowledging the wide range of potential </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8ee\">energy transition impacts for metallurgical coal demand, and for illustrative </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8ef\">purposes only<span class=\"_ _2\"></span>, a five-year acceleration in forecast cash flows relating to </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8f0\">the Group\u2019s metallurgical coal closure and rehabilitation provisions, in </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8f1\">isolation, would be estimated to result in an increase to the provision of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8f2\">approximately 15 per cent, which approximates to US$250 million. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8f3\">Further<span class=\"_ _2\"></span>, while the Group\u2019s NSWEC closure provision remains subject to </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8f4\">estimation and assumptions, the timing of closure is no longer considered </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8f5\">materially susceptible to potential long-term climate-related impacts. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8f6\">More detail on the key judgements and estimates impacting the Group\u2019s </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8f7\">closure and rehabilitation provisions is presented in note 15 \u2018Closure and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8f8\">rehabilitation provisions\u2019. </div><div class=\"t m0 h1f ff6f fs11 fc3 sc0 ls5 ws2 gs8f9\">Paris <span class=\"_ _2\"></span>Agreement and 1.5\u00b0C scenarios<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8fa\">As governments, institutions, companies, and society increasingly focus </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs8fb\">on addressing climate change, the potential for a non-linear and/or more </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8fc\">rapid transition and the subsequent impact on climate-related threats and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8fd\">opportunities increases. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8fe\">Accordingly<span class=\"_ _2\"></span>, in addition to the operational planning cases, the Group </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs8ff\">utilises a range of scenarios, including its 1.5\u00b0C scenario, when </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs900\">testing the resilience of its portfolio, forming strategy and making </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs901\">investment decisions.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs902\">The Group continues to monitor global decarbonisation signposts and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs903\">updates its operational planning cases, price outlooks and cost of carbon </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs904\">assumptions and assessments relating to strategy and capital allocation </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs905\">accordingly<span class=\"_ _2\"></span>. When such signposts indicate the appropriate measures are </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs906\">in place for achievement of a 1.5\u00baC scenario, this will be reflected in the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs907\">Group\u2019s operational planning cases. </div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls5 ws2 gs908\">Capital allocation<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs909\">While a 1.5\u00b0C scenario does not currently represent one of the inputs to </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs90a\">the Group\u2019s operational planning cases, the Group has systematically </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs90b\">integrated its 1.5\u00b0C scenario into the Group\u2019s strategy and capital </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs90c\">allocation process to test the extent to which its capital allocation is aligned </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs90d\">with a rapidly decarbonising global economy<span class=\"_ _2\"></span>. </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs90e\">Specifically<span class=\"_ _2\"></span>, in addition to consideration of the Group\u2019<span class=\"_ _2\"></span>s operational planning </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs90f\">cases, the Group applies its 1.5\u00b0C scenario to assess whether future </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs910\">demand for the Group\u2019s products supports ongoing capital investment. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs911\">The internal allocation of capital under the Group\u2019s Capital <span class=\"_ _2\"></span>Allocation </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs912\">Framework and all major investment decisions continue to require an </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs913\">assessment of investment viability under the Group\u2019s 1.5\u00b0C scenario. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs914\">Integration of the Group\u2019s 1.5\u00b0C scenario into the capital allocation </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs915\">process is intended to mitigate the risk of stranded assets, and associated </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs916\">impairments, should the appropriate global measures to achieve a 1.5\u00b0C </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs917\">outcome be adopted.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h135 ff73 fs5 fc2 sc0 ls5 ws2 gs918\">Demand for the Group\u2019s commodities impacting price outlooks<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs919\">The Group acknowledges that there are a range of possible energy </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs91a\">transition scenarios, including those that are aligned with the aims of </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs91b\">the Paris <span class=\"_ _2\"></span>Agreement, that may indicate different outcomes for individual </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs91c\">commodities. The Group examines the resilience of its portfolio to a 1.5\u00b0C </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs91d\">scenario (the Group\u2019s 1.5\u00b0C scenario) on an ongoing basis by considering </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs91e\">the impact of commodity price estimates under that scenario using the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs91f\">Group\u2019s latest operating plans.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs920\">There are inherent limitations with scenario analysis and it is difficult to </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs921\">predict which, if any<span class=\"_ _2\"></span>, of the scenarios might eventuate and none of the </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs922\">scenarios considered constitutes a definitive outcome for the Group. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs923\">However<span class=\"_ _2\"></span>, the long-term commodity price estimates under the Group\u2019s </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs924\">1.5\u00b0C scenario reflect the world needing more steel, copper<span class=\"_ _2\"></span>, potash and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs925\">nickel in the next 30 years when compared to the last 30 years. In addition, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs926\">the Group\u2019s portfolio is transitioning towards higher quality iron ore and </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs927\">metallurgical coal that enable steelmakers to be more efficient and operate </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs928\">with a lower GHG emissions intensity<span class=\"_ _2\"></span>. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs929\">The Group considers that is it currently impracticable to fully assess all </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs92a\">potential Financial Statement impacts under the Group\u2019s 1.5\u00b0C scenario. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs92b\">However<span class=\"_ _2\"></span>, the Group has carried out analysis which indicates that the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs92c\">long-term commodity price outlooks under this scenario for iron ore, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs92d\">copper<span class=\"_ _2\"></span>, metallurgical coal, nickel and potash are either largely consistent </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs92e\">with or favourable to the price outlooks in the Group\u2019s current operational </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs92f\">planning cases. Given these positive long-term price outlooks, price-only </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs930\">sensitivities to the Group\u2019s long-term 1.5\u00b0C price outlook indicate that there </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs931\">would not be any asset impairments for those commodities. </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs932\">Further<span class=\"_ _2\"></span>, acknowledging the wide range of potential energy transition </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs933\">impacts for metallurgical coal demand, the Group has also performed </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs934\">additional price-only sensitivities for the Group\u2019s metallurgical coal </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs935\">assets. These price-only sensitivities reflect dif<span class=\"_ _2\"></span>ferent price outlooks </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs936\">while assuming that all other factors in the asset valuations, such as </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs937\">production and sales volumes, capital and operating expenditures, carbon </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs938\">pricing and the discount rate, remain unchanged from those used in the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs939\">Group\u2019s FY2023 metallurgical coal impairment assessments. <span class=\"_ _2\"></span>As such, </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs93a\">the sensitivities do not attempt to assess all potential financial statement </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs93b\">impacts, including impacts on asset valuations, that may arise under the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs93c\">Group\u2019s 1.5\u00b0C scenario.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs93d\">Under the Group\u2019s operational planning case assumptions, headroom in </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs93e\">excess of US$6.5 billion currently exists between the carrying value of the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs93f\">Group\u2019s metallurgical coal assets and their estimated valuation. <span class=\"_ _2\"></span>As such, </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs940\">these sensitivities indicate that adverse movements in long-term price </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs941\">assumptions, in isolation, would reduce the current headroom on the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs942\">Group\u2019s metallurgical coal assets but, given the current headroom, may not </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs943\">result in an impairment.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs944\">Price-only sensitivities reflect the following price outlooks published in </div><div class=\"t m0 h9 ff71 fs5 fc3 sc0 ls5 ws2 gs945\">August 2022 by Wood Mackenzie, a research and consultancy business </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs946\">for the global energy<span class=\"_ _2\"></span>, power and renewables, subsurface, chemicals, and </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs947\">metals and mining industries:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs948\">Price source<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs949\">CY2030 Price </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs94a\">(real, US$/<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs94b\">tonne)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs94c\">CY2050 Price </div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs94d\">(real, US$/<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff6f fs3 fc3 sc0 ls5 ws2 gs94e\">tonne)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs94f\">Base case<span class=\"_ _190\"> </span>159<span class=\"_ _25\"> </span>170<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff70 fs2 fc3 sc0 ls5 ws2 gs950\">1.5\u00b0C scenario<span class=\"_ _2e1\"> </span>127<span class=\"_ _25\"> </span>135<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs951\">No impairment is indicated by these price-only sensitivities.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs952\">The Group does not disclose the Group\u2019s internally generated long-term </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs953\">price outlooks for individual commodities, including those under the </div><div class=\"t m0 h8 ff70 fs5 fc3 sc0 ls5 ws2 gs954\">Group\u2019s 1.5\u00b0C scenario, given their commercial sensitivity<span class=\"_ _2a\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h11 ff75 fsa fc3 sc0 ls5 ws2 gs956\">Capital structure<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gs957\">17 <span class=\"_ _47\"> </span>Share capital<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs958\">BHP Group Limited<span class=\"_ _2e2\"> </span>BHP Group Plc<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs959\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs95a\">shares<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs95b\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs95c\">shares<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs95d\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs95e\">shares<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs95f\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs960\">shares<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs961\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs962\">shares<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs963\">Share capital issued<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs964\">Opening number of shares<span class=\"_ _2e3\"> </span><span class=\"ff75\">5,062,323,190<span class=\"_ _15a\"> </span></span>2,945,851,394<span class=\"_ _15a\"> </span>2,945,851,394<span class=\"_ _38\"> </span>2,1<span class=\"_ _2\"></span>12,071,796<span class=\"_ _38\"> </span>2,1<span class=\"_ _2\"></span>12,071,796<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs965\">Issue of shares<span class=\"_ _1b5\"> </span><span class=\"ff75\">3,497,366<span class=\"_ _1fd\"> </span></span>4,400,000<span class=\"_ _29\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _29\"> </span> \u2212<span class=\"_ _29\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs966\">Corporate structure unification<span class=\"_ _216\"> </span><span class=\"ff78\">\u2212<span class=\"_ _38\"> </span><span class=\"ff76\">2,1<span class=\"_ _2a\"></span>12,071,796<span class=\"_ _2e4\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _f1\"> </span></span>(2,1<span class=\"_ _2\"></span>12,071,796)<span class=\"_ _d3\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _39c\"> </span></span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs967\">Purchase of shares by ESOP <span class=\"_ _2\"></span>Trusts<span class=\"_ _178\"> </span><span class=\"ff75\">(6,442,571)<span class=\"_ _24f\"> </span></span>(8,704,669)<span class=\"_ _21\"> </span>(7,587,353)<span class=\"_ _1fe\"> </span>(63,567)<span class=\"_ _8f\"> </span>(185,054)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs968\">Employee share awards exercised following vesting<span class=\"_ _2e5\"> </span><span class=\"ff75\">6,081,843<span class=\"_ _159\"> </span></span>8,522,684<span class=\"_ _1fd\"> </span>6,948,683<span class=\"_ _bc\"> </span>77,748<span class=\"_ _10d\"> </span>173,644<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs969\">Movement in treasury shares under Employee Share Plans<span class=\"_ _bc\"> </span><span class=\"ff75\">360,728<span class=\"_ _10d\"> </span></span>181,985<span class=\"_ _10d\"> </span>638,670<span class=\"_ _bb\"> </span>(14,181)<span class=\"_ _bb\"> </span>1<span class=\"_ _2a\"></span>1,410<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff75 fs2 fc3 sc0 ls5 ws2 gs96a\">Closing number of shares<span class=\"_ _157\"> </span>5,065,820,556<span class=\"_ _d2\"> </span><span class=\"ff76\">5,062,323,190<span class=\"_ _15a\"> </span>2,945,851,394<span class=\"_ _29\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _f2\"> </span></span>2,1<span class=\"_ _2a\"></span>12,071,796<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs96b\">Comprising: </div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs96c\">Shares held by the public<span class=\"_ _11d\"> </span><span class=\"ff75\">5,064,408,782<span class=\"_ _15a\"> </span></span>5,061,272,144<span class=\"_ _15a\"> </span>2,944,982,333<span class=\"_ _29\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _38\"> </span></span>2,1<span class=\"_ _2\"></span>12,057,615<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs96d\">T<span class=\"_ _2\"></span>reasury shares<span class=\"_ _9d\"> </span><span class=\"ff75\">1,41<span class=\"_ _2\"></span>1,774<span class=\"_ _159\"> </span><span class=\"ff76\">1,051,046<span class=\"_ _10d\"> </span>869,061<span class=\"_ _29\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _b0\"> </span></span>14,181<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs96e\">Other share classes<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs96f\">5.5% Preference shares of \u00a31 each<span class=\"_ _2e1\"> </span><span class=\"ff75\">\u2013<span class=\"_ _29\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _29\"> </span> \u2212<span class=\"_ _29\"> </span> \u2212<span class=\"_ _bc\"> </span></span></span>50,000<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs970\">Special V<span class=\"_ _2\"></span>oting share of no par value<span class=\"_ _29b\"> </span><span class=\"ff75\">\u2013<span class=\"_ _29\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _20e\"> </span></span></span>1<span class=\"_ _29\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _29\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs971\">Special V<span class=\"_ _2\"></span>oting share of US$0.50 par value<span class=\"_ _21d\"> </span><span class=\"ff75\">\u2013<span class=\"_ _29\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _29\"> </span> \u2212<span class=\"_ _29\"> </span> \u2212<span class=\"_ _2e5\"> </span></span></span>1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs972\">DLC Dividend share<span class=\"_ _2e6\"> </span><span class=\"ff75\">\u2013<span class=\"_ _29\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _2e5\"> </span></span></span>1<span class=\"_ _29\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _29\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gs973\">During FY2023, BHP Group Limited issued 3,497,366 fully paid ordinary shares to the BHP<span class=\"_ _2\"></span> Group Limited Employee Equity T<span class=\"_ _2\"></span>rust and to Solium Capital </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gs974\">(Australia) Pty Ltd at <span class=\"_ _2\"></span>A$40.51 per share (2022: 4,400,000 fully paid ordinary shares at <span class=\"_ _2\"></span>A$52.99 per share), to satisfy the vesting of employee share awards </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gs975\">and related dividend equivalent entitlements under those employee share plans. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gs976\">Share capital of BHP Group Limited at 30 June 2023 is composed of the following categories of shares:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs977\">Ordinary shares fully paid<span class=\"_ _fb\"> </span>Treasury shares<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs978\">Each fully paid ordinary share of BHP Group </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs979\">Limited carries the right to one vote at a meeting </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs97a\">of the Company<span class=\"_ _2\"></span>. </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs97b\">T<span class=\"_ _2\"></span>reasury shares are fully paid ordinary shares of BHP Group Limited that are held by the ESOP T<span class=\"_ _2\"></span>rusts for </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs97c\">the purpose of issuing shares to employees under the Group\u2019s Employee Share Plans. T<span class=\"_ _2\"></span>reasury shares are </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs97d\">recognised at cost and deducted from equity<span class=\"_ _2\"></span>, net of any income tax effects. When the treasury shares are </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs97e\">subsequently sold or reissued, any consideration received, net of any directly attributable costs and income </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs97f\">tax effects, is recognised as an increase in equity<span class=\"_ _2a\"></span>. Any dif<span class=\"_ _2\"></span>ference between the carrying amount and the </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs980\">consideration, if reissued, is recognised in retained earnings. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs981\">As a result of the corporate structure unification on 31 January 2022, 2,1<span class=\"_ _2\"></span>12,071,796 fully paid ordinary shares in BHP<span class=\"_ _2\"></span> Group Limited were issued to BHP </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs982\">Group Plc shareholders in a one for one exchange of their BHP Group Plc ordinary shares, resulting in BHP Group Limited becoming the sole parent </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs983\">company of the Group with a single set of shareholders.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs984\">The following classes of shares existed prior to the Group\u2019s unification on 31 January 2022:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs985\">Special V<span class=\"_ _2\"></span>oting shares<span class=\"_ _11b\"> </span>Preference shares <span class=\"_ _1ad\"> </span>DLC Dividend share </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs986\">Each of BHP Group Limited and BHP Group Plc </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs987\">had issued one Special V<span class=\"_ _2\"></span>oting share to facilitate </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs988\">joint voting by shareholders of BHP Group Limited </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs989\">and BHP Group Plc on Joint Electorate <span class=\"_ _2\"></span>Actions. </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs98a\">These shares were bought back for nominal value </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs98b\">in January 2022 and subsequently cancelled.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs98c\">Preference shares had the right to repayment of </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs98d\">the amount paid up on the nominal value and any </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs98e\">unpaid dividends in priority to the holders of any </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs98f\">other class of shares in BHP Group Plc on a return </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs990\">of capital or winding up. </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs991\">These shares were acquired by way of gift from </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs992\">J.P<span class=\"_ _50\"></span>. Morgan and subsequently cancelled on </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs993\">31 January 2022. </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs994\">The DLC Dividend share supported the Dual Listed </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs995\">Company (DLC) equalisation principles in place since </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs996\">the merger in 2001, including the requirement that </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs997\">ordinary shareholders of BHP Group Plc and BHP </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs998\">Group Limited were paid equal cash dividends per </div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs999\">share. This share enabled efficient and flexible capital </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs99a\">management across the DLC and was issued on </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs99b\">23 February 2016 at par value of US$10.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs99c\">This share was bought back for nominal value in </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs99d\">January 2022 and subsequently cancelled.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gs99f\">18 <span class=\"_ _47\"> </span>Other equity<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs9a0\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs9a1\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs9a2\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs9a3\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs9a4\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs9a5\">US$M<span class=\"_ _109\"> </span><span class=\"ff75\">Recognition and measurement </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs9a6\">Share premium account<span class=\"_ _2e7\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _e8\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _b8\"> </span></span></span>518<span class=\"_ _109\"> </span>The share premium account represented the premium paid on the issue of BHP </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9a7\">Group Plc shares recognised in accordance with the UK Companies <span class=\"_ _2\"></span>Act 2006. It was </div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs9a8\">transferred to the common control reserve as part of the unification of the Group's </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9a9\">corporate structure.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs9aa\">Capital redemption reserve<span class=\"_ _1aa\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _203\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _b8\"> </span></span></span>177<span class=\"_ _109\"> </span>The capital redemption reserve represented the par value of BHP Group Plc shares </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9ab\">that were purchased and subsequently cancelled. It was transferred to the common </div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs9ac\">control reserve as part of unification of the Group's corporate structure.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs9ad\">Common control reserve<span class=\"_ _68\"> </span><span class=\"ff75\">(1,603)<span class=\"_ _51\"> </span></span>(1,603)<span class=\"_ _8f\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _109\"> </span>The common control reserve arose on unification of the Group\u2019s corporate structure </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9ae\">and represents the residual on consolidation between BHP Group Ltd\u2019s investment </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9af\">in BHP Group Plc (now known as BHP Group (UK) Ltd) and BHP<span class=\"_ _2\"></span> Group Plc\u2019s share </div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs9b0\">capital, share premium and capital redemption reserve at the time of unification.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9b1\">Employee share awards reserve<span class=\"_ _1c\"> </span><span class=\"ff75\">171<span class=\"_ _250\"> </span></span>174<span class=\"_ _b8\"> </span>268<span class=\"_ _109\"> </span>The employee share awards reserve represents the accrued employee entitlements to </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9b2\">share awards that have been charged to the income statement and have not yet been </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9b3\">exercised.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9b4\">Once exercised, the difference between the accumulated fair value of the awards and </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9b5\">their historical on-market purchase price is recognised in retained earnings.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs9b6\">Cash flow hedge reserve<span class=\"_ _56\"> </span><span class=\"ff75\">10<span class=\"_ _e\"> </span><span class=\"ff76\">41<span class=\"_ _250\"> </span>100<span class=\"_ _109\"> </span></span></span>The cash flow hedge reserve represents hedging gains and losses recognised on </div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs9b7\">the effective portion of cash flow hedges. The cumulative deferred gain or loss on the </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9b8\">hedge is recognised in the income statement when the hedged transaction impacts </div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs9b9\">the income statement, or is recognised as an adjustment to the cost of non-financial </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9ba\">hedged items. The hedging reserve records the portion of the gain or loss on a </div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs9bb\">hedging instrument in a cash flow hedge that is determined to be an effective hedge </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9bc\">relationship.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9bd\">Cost of hedging reserve<span class=\"_ _2e7\"> </span><span class=\"ff75\">(1)<span class=\"_ _1a\"> </span></span>(19)<span class=\"_ _1a\"> </span>(54)<span class=\"_ _ef\"> </span>The cost of hedging reserve represents the recognition of certain costs of hedging for </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9be\">example, basis adjustments, which have been excluded from the hedging relationship </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9bf\">and deferred in other comprehensive income until the hedged transaction impacts the </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9c0\">income statement. </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9c1\">Foreign currency translation </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9c2\">reserve<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs9c3\">(14)<span class=\"_ _1a\"> </span><span class=\"ff76\">(14)<span class=\"_ _e6\"> </span>43<span class=\"_ _de\"> </span>The foreign currency translation reserve represents exchange differences arising from </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9c4\">the translation of non-US dollar functional currency operations within the Group into </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9c5\">US dollars.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9c6\">Equity investments reserve<span class=\"_ _3a\"> </span><span class=\"ff75\">9<span class=\"_ _203\"> </span></span>(8)<span class=\"_ _e6\"> </span>15<span class=\"_ _de\"> </span>The equity investment reserve represents the revaluation of investments in shares </div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs9c7\">recognised through other comprehensive income. Where a revalued financial asset is </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9c8\">sold, the relevant portion of the reserve is transferred to retained earnings.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9c9\">Non-controlling interest </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9ca\">contribution reserve<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs9cb\">1,441<span class=\"_ _93\"> </span><span class=\"ff76\">1,441<span class=\"_ _93\"> </span>1,283<span class=\"_ _109\"> </span>The non-controlling interest contribution reserve represents the excess of </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9cc\">consideration received over the book value of net assets attributable to equity </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9cd\">instruments when acquired by non-controlling interests.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs9ce\">T<span class=\"_ _2\"></span>otal reserves<span class=\"_ _d6\"> </span>13<span class=\"_ _e\"> </span><span class=\"ff76\">12<span class=\"_ _93\"> </span>2,350<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs9cf\">Summarised financial information relating to each of the Group\u2019s subsidiaries with non-controlling interests (NCI) that are material to the Group before any </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs9d0\">intra-group eliminations is shown below:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs9d1\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff75 fs3 fc3 sc0 ls5 ws2 gs9d2\">2023<span class=\"_ _1b9\"> </span><span class=\"ff76\">2022<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs9d3\">Minera </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs9d4\">Escondida </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs9d5\">Limitada<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs9d6\">Other individually </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs9d7\">immaterial </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs9d8\">subsidiaries </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs9d9\">(incl. intra-group </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs9da\">eliminations)<span class=\"_ _206\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs9db\">Minera </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs9dc\">Escondida </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs9dd\">Limitada<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs9de\">Other individually </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs9df\">immaterial </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs9e0\">subsidiaries </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs9e1\">(incl. intra-group </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs9e2\">eliminations)<span class=\"_ _12a\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs9e3\">Group share (per cent)<span class=\"_ _2e8\"> </span>57.5<span class=\"_ _20f\"> </span><span class=\"ff76\">57.5<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9e4\">Current assets<span class=\"_ _2e9\"> </span><span class=\"ff75\">3,144<span class=\"_ _29b\"> </span></span>2,929<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9e5\">Non-current assets<span class=\"_ _2ea\"> </span><span class=\"ff75\">12,160<span class=\"_ _11e\"> </span></span>1<span class=\"_ _2\"></span>1,636<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9e6\">Current liabilities<span class=\"_ _219\"> </span><span class=\"ff75\">(1,598)<span class=\"_ _2eb\"> </span></span>(2,192)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9e7\">Non-current liabilities<span class=\"_ _24d\"> </span><span class=\"ff75\">(5,413)<span class=\"_ _1f2\"> </span></span>(4,762)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9e8\">Net assets<span class=\"_ _2ec\"> </span><span class=\"ff75\">8,293<span class=\"_ _87\"> </span></span>7,61<span class=\"_ _2\"></span>1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs9e9\">Net assets attributable to NCI <span class=\"_ _23c\"> </span>3,525<span class=\"_ _10e\"> </span>509<span class=\"_ _21\"> </span>4,034<span class=\"_ _21\"> </span><span class=\"ff76\">3,235<span class=\"_ _10e\"> </span>574<span class=\"_ _21\"> </span>3,809<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9ea\">Revenue<span class=\"_ _2ed\"> </span><span class=\"ff75\">8,847<span class=\"_ _29b\"> </span></span>9,500<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs9eb\">Profit after taxation<span class=\"_ _1d9\"> </span><span class=\"ff75\">2,365<span class=\"_ _2ee\"> </span><span class=\"ff76\">3,522<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9ec\">Other comprehensive income<span class=\"_ _2ef\"> </span><span class=\"ff75\">(8)<span class=\"_ _20d\"> </span></span><span class=\"lsd3 ws102\">11<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs9ed\">T<span class=\"_ _2a\"></span>otal comprehensive income<span class=\"_ _2f0\"> </span><span class=\"ff75\">2,357<span class=\"_ _29b\"> </span></span>3,533<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff78 fs2 fc3 sc0 ls5 ws2 gs9ee\">Profit after taxation attributable to NCI<span class=\"_ _2bc\"> </span><span class=\"ff75\">1,005<span class=\"_ _10e\"> </span>398<span class=\"_ _21\"> </span>1,403<span class=\"_ _37\"> </span><span class=\"ff76\">1,497<span class=\"_ _62\"> </span>658<span class=\"_ _21\"> </span>2,155<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff75 fs2 fc3 sc0 ls5 ws2 gs9ef\">Other comprehensive income attributable to NCI<span class=\"_ _7b\"> </span>(3)<span class=\"_ _3a\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _25\"> </span></span>(3)<span class=\"_ _25\"> </span><span class=\"ff76\">5<span class=\"_ _148\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _61\"> </span></span>5<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff78 fs2 fc3 sc0 ls5 ws2 gs9f0\">Net operating cash flow <span class=\"_ _15c\"> </span><span class=\"ff75\">3,168<span class=\"_ _2ee\"> </span><span class=\"ff76\">4,519<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff78 fs2 fc3 sc0 ls5 ws2 gs9f1\">Net investing cash flow <span class=\"_ _6e\"> </span><span class=\"ff75\">(1,351)<span class=\"_ _2de\"> </span><span class=\"ff76\">(860)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff78 fs2 fc3 sc0 ls5 ws2 gs9f2\">Net financing cash flow <span class=\"_ _1b4\"> </span><span class=\"ff75\">(1,620)<span class=\"_ _1f2\"> </span><span class=\"ff76\">(4,029)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs9f3\">Dividends paid to NCI<span class=\"_ _b1\"> </span>712<span class=\"_ _62\"> </span>463<span class=\"_ _21\"> </span>1,175<span class=\"_ _21\"> </span><span class=\"ff76\">1,760<span class=\"_ _10e\"> </span>780<span class=\"_ _21\"> </span>2,540<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs9f4\">While the Group controls Minera Escondida Limitada, the non-controlling interests hold certain protective rights that restrict the Group\u2019s ability to sell </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs9f5\">assets held by Minera Escondida Limitada, or use the assets in other subsidiaries and operations owned by the Group. Minera Escondida Limitada is also </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs9f6\">restricted from paying dividends without the approval of the non-controlling interests.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws121 gs9f8\">19 Dividends<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff75 fs3 fc3 sc0 ls5 ws2 gs9f9\">Y<span class=\"_ _2\"></span>ear ended 30 June 2023<span class=\"_ _1a1\"> </span><span class=\"ff76\">Y<span class=\"_ _2a\"></span>ear ended 30 June 2022<span class=\"_ _21\"> </span>Y<span class=\"_ _2a\"></span>ear ended 30 June 2021<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs9fa\">Per share <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs9fb\">US cents<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs9fc\">T<span class=\"_ _2\"></span>otal <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs9fd\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs9fe\">Per share <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs9ff\">US cents<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa00\">T<span class=\"_ _2a\"></span>otal <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa01\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa02\">Per share </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa03\">US cents<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa04\">T<span class=\"_ _2a\"></span>otal <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa05\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsa06\">Dividends paid during the period</div><div class=\"t m0 h138 ff75 fs21 fc3 sc0 ls5 ws2 gsa07\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsa08\">Prior year final dividend <span class=\"_ _2f1\"> </span><span class=\"ff75\">175<span class=\"_ _64\"> </span>8,858<span class=\"_ _6f\"> </span><span class=\"ff76\">200<span class=\"_ _1a\"> </span>10,1<span class=\"_ _2\"></span>19<span class=\"_ _a\"> </span>55<span class=\"_ _140\"> </span>2,779<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa09\">Interim dividend<span class=\"_ _186\"> </span><span class=\"ff75\">90<span class=\"_ _140\"> </span>4,562<span class=\"_ _25\"> </span></span>150<span class=\"_ _140\"> </span>7,601<span class=\"_ _25\"> </span>101<span class=\"_ _8f\"> </span>5,1<span class=\"_ _2\"></span>15<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsa0a\">265<span class=\"_ _242\"> </span>13,420<span class=\"_ _6f\"> </span><span class=\"ff76\">350<span class=\"_ _1c\"> </span>17,720<span class=\"_ _25\"> </span>156<span class=\"_ _140\"> </span>7,894<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsa0b\">1 <span class=\"_ _42\"> </span>5.5 per cent dividend on 50,000 preference shares of \u00a31 each determined and paid for financial year 2021. No dividend paid for the financial year 2022. These preference </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa0c\">shares were cancelled on 31 January 2022.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa0d\">Dividends paid during the period differs from the amount of dividends paid in the Consolidated Cash Flow Statement as a result of foreign exchange gains </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa0e\">and losses relating to the timing of equity distributions between the record date and the payment date. <span class=\"_ _2\"></span>Additional derivative settlements of US$161 million </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa0f\">were made as part of the funding of the dividend paid during the period and is disclosed in Proceeds/(settlements) of cash management related </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa10\">instruments in the Consolidated Cash Flow Statement.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa11\">Each <span class=\"_ _2\"></span>American Depositary Share (ADS) represents two ordinary shares of BHP Group Limited. Dividends determined on each <span class=\"_ _2\"></span>ADS represent twice the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa12\">dividend determined on each BHP Group Limited ordinary share. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa13\">Dividends are determined after period-end and announced with the results for the period. Interim dividends are determined in February and paid in March. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa14\">Final dividends are determined in <span class=\"_ _2\"></span>August and paid in September<span class=\"_ _2\"></span>. Dividends determined are not recorded as a liability at the end of the period to which </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsa15\">they relate. Subsequent to year-end, on 22 <span class=\"_ _2\"></span>August 2023, BHP Group Limited determined a final dividend of 80 US cents per share (US$4,052 million), </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsa16\">which will be paid on 28 September 2023 (30 June 2022: final dividend of 175 US cents per share \u2013 US$8,857 million; 30 June 2021: final dividend of 200 </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsa17\">US cents per share \u2013 US$10,1<span class=\"_ _2\"></span>14 million). </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa18\">BHP Group Limited dividends for all periods presented are, or will be, fully franked based on a tax rate of 30 per cent.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsa19\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsa1a\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa1b\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa1c\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa1d\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa1e\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa1f\">Franking credits as at 30 June<span class=\"_ _2f2\"> </span><span class=\"ff75\">7,953<span class=\"_ _64\"> </span></span>7,007<span class=\"_ _1c\"> </span>14,302<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa20\">Franking credits arising on the future payment/(refund) of taxes relating to the period<span class=\"_ _2eb\"> </span><span class=\"ff75\">(261)<span class=\"_ _250\"> </span></span>2,043<span class=\"_ _64\"> </span>1,799<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsa21\">T<span class=\"_ _2\"></span>otal franking credits available<span class=\"_ _39c\"> </span></div><div class=\"t m0 h138 ff75 fs21 fc3 sc0 ls5 ws2 gsa22\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsa23\">7,692<span class=\"_ _64\"> </span><span class=\"ff76\">9,050<span class=\"_ _1c\"> </span>16,101<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsa24\">1 <span class=\"_ _42\"> </span>The payment of the final 2023 dividend determined after 30 June 2023 will reduce the franking account balance by US$1,737 million.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gsa25\">20 <span class=\"_ _47\"> </span>Provisions for dividends and other liabilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls46 ws4b gsa26\">The disclosure below excludes <span class=\"_ _2\"></span>closure and rehabilitation provisions (refer <span class=\"_ _2\"></span>to note 15 \u2018Closure and <span class=\"_ _2\"></span>rehabilitation provisions\u2019), employee benefits, restructuring </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls46 ws4b gsa27\">and post-retirement employee benefits <span class=\"_ _2\"></span>provisions (refer to note 27 <span class=\"_ _2\"></span>\u2018Employee benefits, restructuring and post-retirement <span class=\"_ _2\"></span>employee benefits provisions\u2019) and </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls46 ws4b gsa28\">provisions related to the <span class=\"_ _2\"></span>Samarco dam failure (refer to <span class=\"_ _2\"></span>note 4 \u2018Significant events \u2013 <span class=\"_ _2\"></span>Samarco dam failure\u2019).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsa29\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsa2a\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa2b\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa2c\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsa2d\">At the beginning of the financial year<span class=\"_ _12c\"> </span><span class=\"ff75\">674<span class=\"_ _25\"> </span><span class=\"ff76\">581<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa2e\">Acquisition of subsidiaries and operations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsa2f\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff75 fs2 fc3 sc0 ls5 ws2 gsa30\">61<span class=\"_ _74\"> </span><span class=\"ff77\">\u2013<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa31\">Dividends determined<span class=\"_ _2f3\"> </span><span class=\"ff75\">13,420<span class=\"_ _242\"> </span></span>17,720<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa32\">Charge/(credit) for the year:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa33\">Underlying<span class=\"_ _1a4\"> </span><span class=\"ff75\">156<span class=\"_ _25\"> </span></span>493<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa34\">Discounting<span class=\"_ _2f4\"> </span><span class=\"ff75\">2<span class=\"_ _74\"> </span></span>1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa35\">Exchange variations<span class=\"_ _233\"> </span><span class=\"ff75\">(161)<span class=\"_ _c8\"> </span></span>122<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa36\">Released during the year<span class=\"_ _2d6\"> </span><span class=\"ff75\">(62)<span class=\"_ _b5\"> </span></span>(48)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa37\">Utilisation<span class=\"_ _2f5\"> </span><span class=\"ff75\">(35)<span class=\"_ _b5\"> </span></span>(96)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa38\">Dividends paid<span class=\"_ _235\"> </span><span class=\"ff75\">(13,268)<span class=\"_ _93\"> </span></span>(17,851)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa39\">Divestment and demerger of subsidiaries and operations <span class=\"_ _2f6\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _9c\"> </span></span>(146)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa3a\">T<span class=\"_ _2\"></span>ransfers and other movements<span class=\"_ _2f7\"> </span><span class=\"ff75\">(18)<span class=\"_ _95\"> </span></span>(102)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff78 fs2 fc3 sc0 ls5 ws2 gsa3b\">At the end of the financial year<span class=\"_ _2f8\"> </span><span class=\"ff75\">769<span class=\"_ _25\"> </span><span class=\"ff76\">674<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa3c\">Comprising:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa3d\">Current<span class=\"_ _258\"> </span><span class=\"ff75\">384<span class=\"_ _6f\"> </span></span>356<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa3e\">Non-current<span class=\"_ _2b9\"> </span><span class=\"ff75\">385<span class=\"_ _25\"> </span></span>318<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa3f\">1 <span class=\"_ _42\"> </span>Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019<span class=\"_ _2\"></span> for more information.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h11 ff75 fsa fc3 sc0 ls5 ws2 gsa41\">Financial management<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gsa42\">21 <span class=\"_ _47\"> </span>Net debt<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa43\">The Group seeks to maintain a strong balance sheet and deploys its capital with reference to the Capital <span class=\"_ _2\"></span>Allocation Framework.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa44\">The Group monitors capital using the net debt balance and the gearing ratio, being the ratio of net debt to net debt plus net assets.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsa45\">The net debt definition includes the fair value of derivative financial instruments used to hedge cash and borrowings which reflects the Group\u2019s risk </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsa46\">management strategy of reducing the volatility of net debt caused by fluctuations in foreign exchange and interest rates.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa47\">Under IFRS 16/AASB16 \u2018Leases\u2019, vessel lease contracts are required to be remeasured at each reporting date to the prevailing freight index. While these </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa48\">liabilities are included in the Group interest bearing liabilities, they are excluded from the net debt calculation as they do not align with how the Group </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa49\">assesses net debt for decision making in relation to the Capital <span class=\"_ _2\"></span>Allocation Framework. In addition, the freight index has historically been volatile which </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsa4a\">creates significant short-term fluctuation in these liabilities. </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsa4b\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff75 fs3 fc3 sc0 ls5 ws2 gsa4c\">2023<span class=\"_ _fa\"> </span><span class=\"ff76\">2022<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h5 ff75 fs3 fc3 sc0 ls5 ws2 gsa4d\">Current<span class=\"_ _de\"> </span>Non-current<span class=\"_ _98\"> </span><span class=\"ff76\">Current<span class=\"_ _23\"> </span>Non-current<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsa4e\">Interest bearing liabilities </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa4f\">Bank loans <span class=\"_ _b2\"> </span><span class=\"ff75\">5,310<span class=\"_ _64\"> </span>2,192<span class=\"_ _6f\"> </span></span>397<span class=\"_ _64\"> </span>2,075<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa50\">Notes and debentures <span class=\"_ _29a\"> </span><span class=\"ff75\">1,337<span class=\"_ _242\"> </span>10,482<span class=\"_ _140\"> </span></span>1,690<span class=\"_ _64\"> </span>9,673<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa51\">Lease liabilities<span class=\"_ _2f9\"> </span><span class=\"ff75\">521<span class=\"_ _64\"> </span>2,498<span class=\"_ _6f\"> </span></span>519<span class=\"_ _64\"> </span>2,057<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsa52\">Bank overdraft and short-term borrowings<span class=\"_ _79\"> </span><span class=\"ff75\">5<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa53\">Other<span class=\"_ _2fa\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _6d\"> </span></span>16<span class=\"_ _74\"> </span>1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsa54\">T<span class=\"_ _2\"></span>otal interest bearing liabilities <span class=\"_ _2fb\"> </span>7,173<span class=\"_ _242\"> </span>15,172<span class=\"_ _140\"> </span><span class=\"ff76\">2,622<span class=\"_ _1c\"> </span>13,806<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff78 fs2 fc3 sc0 ls5 ws2 gsa55\">Less: Lease liability associated with index-linked freight contracts<span class=\"_ _2fc\"> </span><span class=\"ff75 ls49 ws4e\">11<span class=\"_ _0\"></span>4<span class=\"_ _eb\"> </span></span><span class=\"ff75\">173<span class=\"_ _eb\"> </span><span class=\"ff76 lsd3 ws102\">11<span class=\"_ _0\"></span>3<span class=\"_ _eb\"> </span></span><span class=\"ff76\">161<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsa56\">Less: Cash and cash equivalents </div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsa57\">Cash<span class=\"_ _2fd\"> </span><span class=\"ff75\">7,206<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _64\"> </span></span></span>5,728<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsa58\">Short-term deposits<span class=\"_ _2fe\"> </span><span class=\"ff75\">5,222<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _1a\"> </span></span></span>1<span class=\"_ _2\"></span>1,508<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff75 fs2 fc3 sc0 ls5 ws2 gsa59\">Less: T<span class=\"_ _2\"></span>otal cash and cash equivalents<span class=\"_ _249\"> </span>12,428<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _1c\"> </span><span class=\"ff76\">17,236<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _39c\"> </span></span></span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsa5a\">Less: Derivatives included in net debt </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa5b\">Net debt management related instruments</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsa5c\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsa5d\">(1<span class=\"_ _2\"></span>13)<span class=\"_ _13\"> </span>(1,459)<span class=\"_ _e\"> </span><span class=\"ff76\">(358)<span class=\"_ _13\"> </span>(1,330)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa5e\">Net cash management related instruments</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsa5f\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff75 fs2 fc3 sc0 ls5 ws2 gsa60\">36<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _25\"> </span><span class=\"ff76\">273<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _39c\"> </span></span></span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsa61\">Less: T<span class=\"_ _2\"></span>otal derivatives included in net debt <span class=\"_ _14c\"> </span>(77)<span class=\"_ _98\"> </span>(1,459)<span class=\"_ _b5\"> </span><span class=\"ff76\">(85)<span class=\"_ _98\"> </span>(1,330)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsa62\">Net debt <span class=\"_ _165\"> </span>1<span class=\"_ _2\"></span>1,166<span class=\"_ _108\"> </span><span class=\"ff76\">333<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsa63\">Net assets<span class=\"_ _264\"> </span>48,530<span class=\"_ _33\"> </span><span class=\"ff76\">48,766<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsa64\">Gearing<span class=\"_ _167\"> </span>18.7%<span class=\"_ _28d\"> </span><span class=\"ff76\">0.7%<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsa65\">1 <span class=\"_ _42\"> </span>Represents the net cross currency and interest rate swaps designated as effective hedging instruments included within current and non-current other financial assets </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa66\">and liabilities.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsa67\">2 <span class=\"_ _42\"> </span>Represents the net forward exchange contracts included within current and non-current other financial assets and liabilities.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsa68\">Cash and short-term deposits are disclosed in the cash flow statement net of bank overdrafts and interest bearing liabilities at call.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsa69\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsa6a\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa6b\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa6c\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa6d\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa6e\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa6f\">T<span class=\"_ _2a\"></span>otal cash and cash equivalents <span class=\"_ _2ff\"> </span><span class=\"ff75\">12,428<span class=\"_ _242\"> </span></span>17,236<span class=\"_ _1c\"> </span>15,246<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsa70\">Bank overdrafts and short-term borrowings<span class=\"_ _29c\"> </span><span class=\"ff75\">(5)<span class=\"_ _b0\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsa71\">T<span class=\"_ _2\"></span>otal cash and cash equivalents, net of overdrafts<span class=\"_ _300\"> </span>12,423<span class=\"_ _242\"> </span><span class=\"ff76\">17,236<span class=\"_ _1c\"> </span>15,246<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa72\">Cash and cash equivalents includes US$95 million (2022: US$127 million) restricted by legal or contractual arrangements.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gsa73\">Recognition and measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa74\">Cash and short-term deposits in the balance sheet comprise cash at bank and on hand and highly liquid cash deposits with short-term maturities that </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsa75\">are readily convertible to known amounts of cash with insignificant risk of change in value. The Group considers that the carrying value of cash and </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa76\">cash equivalents approximate fair value due to their short-term to maturity<span class=\"_ _2\"></span>. Refer to note 22 \u2018Leases\u2019<span class=\"_ _2\"></span> and note 24 \u2018Financial risk management\u2019<span class=\"_ _2\"></span> for the </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsa77\">recognition and measurement principles for lease liabilities and other financial liabilities.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa78\">Interest bearing liabilities and cash and cash equivalents include balances denominated in the following currencies:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsa79\">Interest bearing liabilities<span class=\"_ _156\"> </span>Cash and cash equivalents<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsa7a\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsa7b\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa7c\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa7d\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsa7e\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsa7f\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa80\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsa81\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa82\">USD<span class=\"_ _289\"> </span><span class=\"ff75\">16,289<span class=\"_ _64\"> </span></span>8,813<span class=\"_ _140\"> </span><span class=\"ff75\">5,925<span class=\"_ _64\"> </span></span>7,654<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa83\">EUR<span class=\"_ _26c\"> </span><span class=\"ff75\">3,050<span class=\"_ _64\"> </span></span>3,463<span class=\"_ _25\"> </span><span class=\"ff75\">544<span class=\"_ _140\"> </span></span>2,656<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa84\">GBP<span class=\"_ _26c\"> </span><span class=\"ff75\">1,587<span class=\"_ _64\"> </span></span>2,621<span class=\"_ _25\"> </span><span class=\"ff75\">674<span class=\"_ _6d\"> </span></span>30<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa85\">AUD<span class=\"_ _26c\"> </span><span class=\"ff75\">1,233<span class=\"_ _25\"> </span></span>783<span class=\"_ _64\"> </span><span class=\"ff75\">1,797<span class=\"_ _140\"> </span></span>3,360<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa86\">CAD<span class=\"_ _301\"> </span><span class=\"ff75\">7<span class=\"_ _25\"> </span></span>584<span class=\"_ _140\"> </span><span class=\"ff75\">3,362<span class=\"_ _64\"> </span></span>3,437<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsa87\">Other<span class=\"_ _269\"> </span><span class=\"ff75\">179<span class=\"_ _25\"> </span></span>164<span class=\"_ _6f\"> </span><span class=\"ff75\">126<span class=\"_ _a\"> </span></span>99<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsa88\">T<span class=\"_ _2\"></span>otal<span class=\"_ _302\"> </span>22,345<span class=\"_ _242\"> </span><span class=\"ff76\">16,428<span class=\"_ _1c\"> </span></span>12,428<span class=\"_ _1c\"> </span><span class=\"ff76\">17,236<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa89\">The Group enters into derivative transactions to convert the majority of its exposures above into US dollars. Further information on the Group\u2019s risk </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa8a\">management activities relating to these balances is provided in note 24 \u2018Financial risk management\u2019.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gsa8c\">Liquidity risk </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa8d\">The Group\u2019s liquidity risk arises from the possibility that it may not be able to settle or meet its obligations as they fall due and is managed as part of the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa8e\">portfolio risk management strategy<span class=\"_ _2\"></span>. Operational, capital and regulatory requirements are considered in the management of liquidity risk, in conjunction </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa8f\">with short-term and long-term forecast information. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsa90\">Recognising the cyclical volatility of operating cash flows, the Group has defined minimum target cash and liquidity buffers to be maintained to mitigate </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa91\">liquidity risk and support operations through the cycle.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsa92\">The Group\u2019s strong credit profile, diversified funding sources, its minimum cash buffer and its committed credit facilities ensure that sufficient liquid funds </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa93\">are maintained to meet its daily cash requirements. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa94\">The Group\u2019s Moody\u2019<span class=\"_ _2\"></span>s credit rating changed from <span class=\"_ _2\"></span>A2/P-1 to <span class=\"_ _2\"></span>A1/P-1 outlook stable (long-term/short-term). The Group\u2019s Standard &amp; Poor\u2019s rating has </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa95\">remained at <span class=\"_ _2\"></span>A-/A-1 outlook stable (long-term/short-term).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa96\">There were no defaults on the Group\u2019s liabilities during the period.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc2 sc0 ls5 ws2 gsa97\">Counterparty risk<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsa98\">The Group is exposed to credit risk from its financing activities, including short-term cash investments such as deposits with banks and derivative </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa99\">contracts. This risk is managed by Group <span class=\"_ _2\"></span>Treasury in line with the counterparty risk framework, which aims to minimise the exposure to a counterparty </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsa9a\">and mitigate the risk of financial loss through counterparty failure.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa9b\">Exposure to counterparties is monitored at a Group level across all products and includes exposure with derivatives and cash investments.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsa9c\">Investments and derivatives are only transacted with approved counterparties who have been assigned specific limits based on a quantitative credit risk </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa9d\">model. These limits are updated at least bi-annually<span class=\"_ _2a\"></span>. <span class=\"_ _2\"></span>Additionally<span class=\"_ _2\"></span>, derivatives are subject to tenor limits and investments are subject to concentration limits </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa9e\">by rating.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsa9f\">Derivative fair values are inclusive of valuation adjustments that take into account both the counterparty and the Group\u2019s risk of default.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc2 sc0 ls5 ws2 gsaa0\">Standby arrangements and unused credit facilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsaa1\">The Group\u2019s committed revolving credit facility operates as a back-stop to the Group\u2019<span class=\"_ _2\"></span>s uncommitted commercial paper program. The combined amount </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsaa2\">drawn under the facility or as commercial paper will not exceed US$5.5 billion. <span class=\"_ _2\"></span>As at 30 June 2023, US$ nil commercial paper was drawn (2022:  </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsaa3\">US$ nil). The facility is due to mature on 10 October 2026. <span class=\"_ _2\"></span>A<span class=\"_ _2\"></span> commitment fee is payable on the undrawn balance and interest is payable on any </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsaa4\">drawn balance comprising a reference rate plus a margin. The agreed margins are typical for a credit facility extended to a company with the Group\u2019s </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsaa5\">credit rating.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc2 sc0 ls5 ws2 gsaa6\">Maturity profile of financial liabilities </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsaa7\">The maturity profile of the Group\u2019s financial liabilities based on the undiscounted contractual amounts, taking into account the derivatives related to debt, </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsaa8\">is as follows: </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsaa9\">2023  </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsaaa\">US$M </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsaab\">Bank loans, </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws128 gsaac\">debentures and </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsaad\">other loans<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff78 fs3 fc3 sc0 ls5 ws2 gsaae\">Expected </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsaaf\">future interest </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsab0\">payments<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsab1\">Derivatives </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsab2\">related to </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsab3\">debentures<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsab4\">Other </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsab5\">derivatives<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsab6\">Obligations </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsab7\">under lease </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsab8\">liabilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsab9\">T<span class=\"_ _2\"></span>rade <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsaba\">and other </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsabb\">payables<span class=\"_ _39c\"> </span></div><div class=\"t m0 h137 ff75 fsfe fc3 sc0 ls5 ws2 gsabc\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsabd\">T<span class=\"_ _2\"></span>otal<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsabe\">Due for payment:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsabf\">In one year or less or on demand<span class=\"_ _21c\"> </span><span class=\"ff75\">6,659<span class=\"_ _6f\"> </span>757<span class=\"_ _140\"> </span>536<span class=\"_ _64\"> </span>257<span class=\"_ _140\"> </span>658<span class=\"_ _21\"> </span>6,175<span class=\"_ _156\"> </span>15,042<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsac0\">In more than one year but not more than two years<span class=\"_ _29\"> </span><span class=\"ff75\">1,399<span class=\"_ _25\"> </span>595<span class=\"_ _64\"> </span>388<span class=\"_ _140\"> </span>126<span class=\"_ _140\"> </span>538<span class=\"_ _1a3\"> </span>4<span class=\"_ _93\"> </span>3,050<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsac1\">In more than two years but not more than five years<span class=\"_ _202\"> </span><span class=\"ff75\">4,058<span class=\"_ _64\"> </span>1,410<span class=\"_ _140\"> </span>399<span class=\"_ _140\"> </span>267<span class=\"_ _37\"> </span>1,031<span class=\"_ _6f\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _93\"> </span></span>7,165<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsac2\">In more than five years<span class=\"_ _2c0\"> </span><span class=\"ff75\">8,093<span class=\"_ _140\"> </span>3,693<span class=\"_ _21\"> </span>1,020<span class=\"_ _8f\"> </span><span class=\"ls49 ws4e\">2<span class=\"_ _0\"></span>11<span class=\"_ _24f\"> </span></span>1,846<span class=\"_ _25\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _3\"> </span></span>14,863<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsac3\">T<span class=\"_ _2\"></span>otal<span class=\"_ _134\"> </span>20,209<span class=\"_ _140\"> </span>6,455<span class=\"_ _21\"> </span>2,343<span class=\"_ _64\"> </span>861<span class=\"_ _21\"> </span>4,073<span class=\"_ _21\"> </span>6,179<span class=\"_ _156\"> </span>40,120<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsac4\">Carrying amount<span class=\"_ _6c\"> </span>19,326<span class=\"_ _c5\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _21\"> </span></span>1,755<span class=\"_ _140\"> </span>804<span class=\"_ _21\"> </span>3,019<span class=\"_ _37\"> </span>6,179<span class=\"_ _3\"> </span>31,083<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsac5\">2022  </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsac6\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsac7\">Bank loans, </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsac8\">debentures and </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsac9\">other loans<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsaca\">Expected </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsacb\">future interest </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsacc\">payments<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsacd\">Derivatives </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsace\">related to </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsacf\">debentures<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsad0\">Other </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsad1\">derivatives<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsad2\">Obligations </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsad3\">under lease </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsad4\">liabilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsad5\">Trade <span class=\"_ _2a\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsad6\">and other </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsad7\">payables</div><div class=\"t m0 h132 ff76 fsfe fc3 sc0 ls5 ws2 gsad8\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsad9\">T<span class=\"_ _2a\"></span>otal<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsada\">Due for payment:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsadb\">In one year or less or on demand<span class=\"_ _21c\"> </span>2,109<span class=\"_ _6f\"> </span>492<span class=\"_ _140\"> </span>525<span class=\"_ _64\"> </span>221<span class=\"_ _e\"> </span>579<span class=\"_ _21\"> </span>6,608<span class=\"_ _156\"> </span>10,534<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsadc\">In more than one year but not more than two years<span class=\"_ _29\"> </span>1,634<span class=\"_ _25\"> </span>427<span class=\"_ _64\"> </span>300<span class=\"_ _95\"> </span><span class=\"lsd3 ws102\">11<span class=\"_ _0\"></span>2<span class=\"_ _168\"> </span></span>443<span class=\"_ _6f\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _93\"> </span></span>2,916<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsadd\">In more than two years but not more than five years<span class=\"_ _202\"> </span><span class=\"ff76\">2,609<span class=\"_ _64\"> </span>1,032<span class=\"_ _140\"> </span>492<span class=\"_ _140\"> </span>246<span class=\"_ _95\"> </span>936<span class=\"_ _25\"> </span></span> \u2212<span class=\"_ _d5\"> </span><span class=\"ff76\">5,315<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsade\">In more than five years<span class=\"_ _2c0\"> </span><span class=\"ff76\">7,550<span class=\"_ _140\"> </span>3,705<span class=\"_ _21\"> </span>1,467<span class=\"_ _64\"> </span>245<span class=\"_ _13\"> </span>1,470<span class=\"_ _6f\"> </span></span> \u2212<span class=\"_ _156\"> </span><span class=\"ff76\">14,437<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsadf\">T<span class=\"_ _2a\"></span>otal<span class=\"_ _2aa\"> </span>13,902<span class=\"_ _1ff\"> </span>5,656<span class=\"_ _21\"> </span>2,784<span class=\"_ _140\"> </span>824<span class=\"_ _13\"> </span>3,428<span class=\"_ _21\"> </span>6,608<span class=\"_ _156\"> </span>33,202<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsae0\">Carrying amount<span class=\"_ _1ed\"> </span>13,852<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _21\"> </span></span>1,824<span class=\"_ _140\"> </span>752<span class=\"_ _119\"> </span>2,576<span class=\"_ _21\"> </span>6,608<span class=\"_ _156\"> </span>25,612<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsae1\">1 <span class=\"_ _42\"> </span>Excludes input taxes of US$121 million (2022: US$79 million) included in other payables. Refer to note 9 \u2018Trade and other payables\u2019.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws121 gsae3\">22 Leases<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsae4\">Movements in the Group\u2019s lease liabilities during the year are as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsae5\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsae6\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsae7\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsae8\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsae9\">At the beginning of the financial year<span class=\"_ _2d2\"> </span><span class=\"ff75\">2,576<span class=\"_ _64\"> </span><span class=\"ff76\">3,896<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsaea\">Additions<span class=\"_ _2f5\"> </span><span class=\"ff75\">542<span class=\"_ _25\"> </span></span>866<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsaeb\">Acquisition of subsidiaries and operations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsaec\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff75 fs2 fc3 sc0 ls5 ws2 gsaed\">423<span class=\"_ _74\"> </span><span class=\"ff77\">\u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsaee\">Remeasurements of index-linked freight contracts<span class=\"_ _2d1\"> </span><span class=\"ff75\">53<span class=\"_ _9c\"> </span></span>(369)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsaef\">Lease payments</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsaf0\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsaf1\">(706)<span class=\"_ _13\"> </span><span class=\"ff76\">(1,288)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsaf2\">Foreign exchange movement<span class=\"_ _303\"> </span><span class=\"ff75\">12<span class=\"_ _9c\"> </span></span>(126)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsaf3\">Amortisation of discounting<span class=\"_ _232\"> </span><span class=\"ff75\">130<span class=\"_ _25\"> </span></span>125<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsaf4\">Divestment and demerger of subsidiaries and operations</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsaf5\">3</div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsaf6\"> <span class=\"_ _243\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _9c\"> </span></span>(492)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsaf7\">T<span class=\"_ _2\"></span>ransfers and other movements<span class=\"_ _304\"> </span><span class=\"ff75\">(1<span class=\"_ _2\"></span>1)<span class=\"_ _b5\"> </span><span class=\"ff76\">(36)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff78 fs2 fc3 sc0 ls5 ws2 gsaf8\">At the end of the financial year<span class=\"_ _2d8\"> </span><span class=\"ff75\">3,019<span class=\"_ _64\"> </span><span class=\"ff76\">2,576<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsaf9\">Comprising:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsafa\">Current liabilities<span class=\"_ _305\"> </span><span class=\"ff75\">521<span class=\"_ _25\"> </span></span>519<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsafb\">Non-current liabilities<span class=\"_ _306\"> </span><span class=\"ff75\">2,498<span class=\"_ _64\"> </span></span>2,057<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsafc\">1 <span class=\"_ _42\"> </span>Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019<span class=\"_ _2\"></span> for more information. </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsafd\">2 <span class=\"_ _42\"> </span>Includes US$ nil (2022: US$39 million) related to Discontinued operations.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsafe\">3 <span class=\"_ _42\"> </span>Relates to the divestment of BMC and merger of Petroleum with Woodside in FY2022. Refer to notes 3 \u2018Exceptional items\u2019<span class=\"_ _2\"></span> and 28 \u2018Discontinued operations\u2019 for </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsaff\">more information.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsb00\">A<span class=\"_ _2\"></span> significant proportion by value of the Group\u2019s lease contracts relate to plant facilities, office buildings and vessels. Lease terms for plant facilities and </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsb01\">office buildings typically run for over 10 years and vessels from four to 10 years. Other leases include port facilities, various equipment and vehicles. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb02\">The lease contracts contain a wide range of different terms and conditions including extension and termination options and variable lease payments.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb03\">The Group\u2019s lease obligations are included in the Group\u2019s Interest bearing liabilities and, with the exception of vessel lease contracts that are priced with </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb04\">reference to a freight index, form part of the Group\u2019s net debt. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsb05\">The maturity profile of lease liabilities based on the undiscounted contractual amounts is as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsb06\">Lease liability<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsb07\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsb08\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb09\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb0a\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsb0b\">Due for payment:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsb0c\">In one year or less or on demand<span class=\"_ _240\"> </span><span class=\"ff75\">658<span class=\"_ _25\"> </span></span>579<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsb0d\">In more than one year but not more than two years<span class=\"_ _138\"> </span><span class=\"ff75\">538<span class=\"_ _25\"> </span></span>443<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsb0e\">In more than two years but not more than five years<span class=\"_ _28b\"> </span><span class=\"ff75\">1,031<span class=\"_ _25\"> </span><span class=\"ff76\">936<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsb0f\">In more than five years<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsb10\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsb11\">1,846<span class=\"_ _64\"> </span><span class=\"ff76\">1,470<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsb12\">T<span class=\"_ _2\"></span>otal<span class=\"_ _2bb\"> </span>4,073<span class=\"_ _64\"> </span><span class=\"ff76\">3,428<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsb13\">Carrying amount<span class=\"_ _307\"> </span>3,019<span class=\"_ _64\"> </span><span class=\"ff76\">2,576<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb14\">1 <span class=\"_ _42\"> </span>Includes US$808 million (2022: US$707 million) due for payment in more than ten years. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 lse4 ws2 gsb15\">At 30 June 2023, commitments for leases not yet commenced based on undiscounted contractual amounts were US$1,271 million (2022: US$928 million).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb16\">Movements in the Group\u2019s right-of-use assets during the year are as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff75 fs3 fc3 sc0 ls5 ws2 gsb17\">2023<span class=\"_ _1b9\"> </span><span class=\"ff76\">2022<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsb18\">Land and </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsb19\">buildings </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsb1a\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsb1b\">Plant and </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsb1c\">equipment </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsb1d\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsb1e\">T<span class=\"_ _2\"></span>otal <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsb1f\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb20\">Land and </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb21\">buildings <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb22\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb23\">Plant and </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb24\">equipment </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb25\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb26\">T<span class=\"_ _2a\"></span>otal <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb27\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsb28\">Net book value<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsb29\">At the beginning of the financial year<span class=\"_ _e4\"> </span><span class=\"ff75\">452<span class=\"_ _140\"> </span>1,909<span class=\"_ _64\"> </span>2,361<span class=\"_ _6f\"> </span><span class=\"ff76\">638<span class=\"_ _64\"> </span>2,712<span class=\"_ _140\"> </span>3,350<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsb2a\">Additions <span class=\"_ _2e0\"> </span><span class=\"ff75\">192<span class=\"_ _25\"> </span>350<span class=\"_ _25\"> </span>542<span class=\"_ _6d\"> </span></span>41<span class=\"_ _25\"> </span>825<span class=\"_ _6f\"> </span>866<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsb2b\">Acquisition of subsidiaries and operations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsb2c\">1</div><div class=\"t m0 h32 ff78 fs2 fc3 sc0 ls5 ws2 gsb2d\"> \u2212<span class=\"_ _25\"> </span><span class=\"ff75\">423<span class=\"_ _6f\"> </span>423<span class=\"_ _74\"> </span><span class=\"ff77\">\u2212<span class=\"_ _ec\"> </span>\u2212<span class=\"_ _74\"> </span>\u2212<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsb2e\">Remeasurements of index-linked freight contracts<span class=\"_ _d9\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _a\"> </span><span class=\"ff75\">53<span class=\"_ _6d\"> </span>53<span class=\"_ _c5\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _9c\"> </span></span></span></span>(369)<span class=\"_ _e\"> </span>(369)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsb2f\">Depreciation expensed during the period <span class=\"_ _78\"> </span><span class=\"ff75\">(71)<span class=\"_ _e\"> </span>(462)<span class=\"_ _95\"> </span>(533)<span class=\"_ _e\"> </span></span>(103)<span class=\"_ _e\"> </span>(872)<span class=\"_ _95\"> </span>(975)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsb30\">Depreciation classified as exploration<span class=\"_ _2eb\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span></span> \u2212<span class=\"_ _55\"> </span><span class=\"ff76\">(3)<span class=\"_ _b0\"> </span>(3)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsb31\">Impairments for the year<span class=\"_ _1d9\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span></span>(7)<span class=\"_ _b0\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span></span>(7)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsb32\">Divestment and demerger of subsidiaries and operations</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsb33\">2</div><div class=\"t m0 hd ff78 fs2 fc3 sc0 ls5 ws2 gsb34\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _1b\"> </span><span class=\"ff76\">(1<span class=\"_ _2\"></span>16)<span class=\"_ _e\"> </span>(313)<span class=\"_ _95\"> </span>(429)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsb35\">T<span class=\"_ _2\"></span>ransfers and other movements<span class=\"_ _308\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _14f\"> </span><span class=\"ff75\">(37)<span class=\"_ _10d\"> </span>(37)<span class=\"_ _b0\"> </span></span></span>(1)<span class=\"_ _10d\"> </span>(71)<span class=\"_ _b5\"> </span>(72)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff78 fs2 fc3 sc0 ls5 ws2 gsb36\">At the end of the financial year<span class=\"_ _1b9\"> </span><span class=\"ff75\">573<span class=\"_ _140\"> </span>2,236<span class=\"_ _64\"> </span>2,809<span class=\"_ _6f\"> </span><span class=\"ff76\">452<span class=\"_ _64\"> </span>1,909<span class=\"_ _140\"> </span>2,361<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsb37\">\u2013 Cost<span class=\"_ _b3\"> </span><span class=\"ff75\">758<span class=\"_ _64\"> </span>4,088<span class=\"_ _64\"> </span>4,846<span class=\"_ _6f\"> </span><span class=\"ff76\">745<span class=\"_ _64\"> </span>4,307<span class=\"_ _140\"> </span>5,052<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsb38\">\u2013 <span class=\"_ _2\"></span>Accumulated depreciation and impairments<span class=\"_ _11f\"> </span><span class=\"ff75\">(185)<span class=\"_ _13\"> </span>(1,852)<span class=\"_ _13\"> </span>(2,037)<span class=\"_ _e\"> </span><span class=\"ff76\">(293)<span class=\"_ _13\"> </span>(2,398)<span class=\"_ _13\"> </span>(2,691)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb39\">1 <span class=\"_ _42\"> </span>Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019<span class=\"_ _2\"></span> for more information. </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb3a\">2 <span class=\"_ _42\"> </span>Relates to the divestment of BMC and merger of Petroleum with Woodside in FY2022. Refer to notes 3 \u2018Exceptional items\u2019<span class=\"_ _2\"></span> and 28 \u2018Discontinued operations\u2019 for </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb3b\">more information.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb3c\">Right-of-use assets are included within the underlying asset classes in Property<span class=\"_ _2\"></span>, plant and equipment. Refer to note 1<span class=\"_ _2a\"></span>1 \u2018Property<span class=\"_ _2\"></span>, plant and equipment\u2019.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsb3e\">Amounts recorded in the income statement and the cash flow statement for the year were: </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsb3f\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsb40\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb41\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb42\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb43\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb44\">US$M<span class=\"_ _23\"> </span><span class=\"ff75\">Included within<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsb45\">Income statement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsb46\">Depreciation of right-of-use assets<span class=\"_ _1ba\"> </span><span class=\"ff75\">533<span class=\"_ _25\"> </span></span>964<span class=\"_ _25\"> </span>753<span class=\"_ _23\"> </span><span class=\"ff77\">Profit from operations<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsb47\">Short-term, low-value and variable lease costs</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsb48\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff75 fs2 fc3 sc0 ls5 ws2 gsb49\">795<span class=\"_ _25\"> </span><span class=\"ff76\">847<span class=\"_ _6f\"> </span>834<span class=\"_ _23\"> </span><span class=\"ff77\">Profit from operations<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsb4a\">Interest on lease liabilities <span class=\"_ _309\"> </span><span class=\"ff75\">130<span class=\"_ _eb\"> </span></span><span class=\"lsd3 ws102\">11<span class=\"_ _0\"></span>9<span class=\"_ _eb\"> </span></span>102<span class=\"_ _23\"> </span>Financial expenses<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff78 fs2 fc3 sc0 ls5 ws2 gsb4b\">Cash flow statement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsb4c\">Principal lease payments <span class=\"_ _100\"> </span><span class=\"ff75\">576<span class=\"_ _64\"> </span></span>1,130<span class=\"_ _6f\"> </span>732<span class=\"_ _23\"> </span><span class=\"ff77\">Cash flows from financing activities<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsb4d\">Lease interest payments <span class=\"_ _216\"> </span><span class=\"ff75\">130<span class=\"_ _eb\"> </span></span><span class=\"lsd3 ws102\">11<span class=\"_ _43\"></span>9<span class=\"_ _eb\"> </span></span>102<span class=\"_ _23\"> </span><span class=\"ff77\">Cash flows from operating activities<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsb4e\">1 <span class=\"_ _42\"> </span>Relates to US$714 million of variable lease costs (2022: US$585 million; 2021: US$510 million), US$47 million of short-term lease costs (2022: US$222 million; 2021: </div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsb4f\">US$294 million) and US$34 million of low-value lease costs (2022: US$40 million; 2021: US$30 million). V<span class=\"_ _2\"></span>ariable lease costs include contracts for hire of mining service </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb50\">equipment, drill rigs and transportation services. These contracts contain variable lease payments based on usage and asset performance.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gsb51\">Recognition and measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb52\">All leases with the exception of short-term (under 12 months) and low-value leases are recognised on the balance sheet, as a right-of-use asset </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb53\">and a corresponding interest bearing liability<span class=\"_ _2\"></span>. Lease liabilities are initially measured at the present value of the future lease payments from the lease </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsb54\">commencement date and are subsequently adjusted to reflect the interest on lease liabilities, lease payments and any remeasurements due to, for </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsb55\">example, lease modifications or a change to future lease payments linked to an index or rate. Lease payments are discounted using the interest rate </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb56\">implicit in the lease or<span class=\"_ _2\"></span>, where the rate is not readily determinable, the interest payments are discounted at the Group\u2019s weighted average incremental </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsb57\">borrowing rate, adjusted to reflect factors specific to the lease, including where relevant the currency<span class=\"_ _2\"></span>, tenor and location of the lease. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb58\">In addition to containing a lease, the Group\u2019s contractual arrangements may include non-lease components. For example, certain mining services </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb59\">arrangements involve the provision of additional services, including maintenance, drilling activities and the supply of personnel. The Group has elected to </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb5a\">separate these non-lease components from the lease components in measuring lease liabilities. Non-lease components are accounted for in accordance </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb5b\">with the accounting policies applied to each underlying good or service received.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb5c\">Low-value and short-term leases continue to be expensed to the income statement. V<span class=\"_ _2\"></span>ariable lease payments not dependent on an index or rate are </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb5d\">excluded from lease liabilities, and expensed to the income statement. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb5e\">Right-of-use assets are measured at cost, less any accumulated depreciation and impairment losses, and adjusted for any remeasurement of lease </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb5f\">liabilities. The cost will initially correspond to the lease liability<span class=\"_ _2a\"></span>, adjusted for initial direct costs, lease payments made prior to lease commencement, </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb60\">capitalised provisions for closure and rehabilitation and any lease incentives received.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb61\">The lease asset and liability associated with all index-linked freight contracts, including continuous voyage charters (CVCs), are measured at each </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb62\">reporting date based on the prevailing freight index (generally the Baltic C5 index).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsb63\">Lease costs are recognised in the income statement over the lease term in the form of depreciation on the right-of-use asset and the unwinding of finance </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb64\">charges on the lease liability<span class=\"_ _2\"></span>. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb65\">Where the Group is the operator of an unincorporated joint operation and all investors are parties to a lease, the Group recognises its proportionate share </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb66\">of the lease liability and associated right-of-use asset. In the event the Group is the sole signatory to a lease, and therefore has the sole legal obligation to </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsb67\">make lease payments, the lease liability is recognised in full. Where the associated right-of-use asset is sub-leased (under a finance sub-lease) to a joint </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb68\">operation, for instance where it is dedicated to a single operation and the joint operation has the right to direct the use of the asset, the Group (as lessor) </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb69\">recognises its proportionate share of the right-of-use asset and a net investment in the lease, representing amounts to be recovered from the other parties </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb6a\">to the joint operation. If the Group is not party to the head lease contract but sub-leases the associated right-of-use asset (as lessee), it recognises its </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb6b\">proportionate share of the right-of-use asset and a lease liability which is payable to the operator<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gsb6c\">Key judgements and estimates<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff75 fs5 fc3 sc0 ls5 ws2 gsb6d\">Judgements:<span class=\"ff76\"> Certain contractual arrangements not in the form of a </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsb6e\">lease require the Group to apply significant judgement in evaluating </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb6f\">whether the Group controls the right to direct the use of assets and </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb70\">therefore whether the contract contains a lease. Management considers </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb71\">all facts and circumstances in determining whether the Group or the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb72\">supplier has the rights to direct how<span class=\"_ _2\"></span>, and for what purpose, the underlying </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb73\">assets are used in certain mining contracts and other arrangements, </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb74\">including outsourcing and shipping arrangements. Judgement is used to </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsb75\">assess which decision-making rights mostly affect the benefits of use of </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb76\">the assets for each arrangement. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb77\">Where a contract includes the provision of non-lease services, judgement </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsb78\">is required to identify the lease and non-lease components. </div><div class=\"t m0 h8 ff75 fs5 fc3 sc0 ls5 ws2 gsb79\">Estimates: <span class=\"ff76 ls46\">Where the Group cannot readily determine the interest rate </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsb7a\">implicit in the lease, estimation is involved in the determination of the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsb7b\">weighted average incremental borrowing rate to measure lease liabilities. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls46 ws4b gsb7c\">The incremental borrowing rate <span class=\"_ _2\"></span>reflects the rates of interest <span class=\"_ _2\"></span>a lessee </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsb7d\">would have to pay to borrow over a similar term, with similar security<span class=\"_ _2\"></span>, the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsb7e\">funds necessary to obtain an asset of similar value to the right-of-use </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsb7f\">asset in a similar economic environment. Under the Group\u2019s portfolio </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls46 ws4b gsb80\">approach to debt management, <span class=\"_ _2\"></span>the Group does not specifically <span class=\"_ _2\"></span>borrow for </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsb81\">asset purchases. Therefore, the incremental borrowing rate is estimated </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsb82\">referencing the Group\u2019s corporate borrowing portfolio and other similar </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls46 ws4b gsb83\">rated entities, adjusted to <span class=\"_ _2\"></span>reflect the terms and conditions <span class=\"_ _2\"></span>of the lease </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsb84\">(including the impact of currency<span class=\"_ _2\"></span>, credit rating of subsidiary entering </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsb85\">into the lease and the term of the lease), at the inception of the lease </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls46 ws4b gsb86\">arrangement or the time <span class=\"_ _2\"></span>of lease modification. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsb87\">The Group estimates stand-alone prices, where such prices are not readily </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsb88\">observable, in order to allocate the contractual payments between lease </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsb89\">and non-lease components.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff78 fs7 fc7 sc0 ls5 ws2 gsb8b\">23 <span class=\"_ _47\"> </span>Net finance costs<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsb8c\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsb8d\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb8e\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb8f\">US$M </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb90\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsb91\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff78 fs2 fc3 sc0 ls5 ws2 gsb92\">Financial expenses<span class=\"_ _39c\"> </span></div><div class=\"t m0 h45 ff79 fs2 fc3 sc0 ls5 ws2 gsb93\">Interest expense using the effective interest rate method:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsb94\">Interest on bank loans, overdrafts and all other borrowings <span class=\"_ _30a\"> </span><span class=\"ff75\">997<span class=\"_ _25\"> </span></span>491<span class=\"_ _6f\"> </span>607<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsb95\">Interest capitalised at 5.71% (2022: 2.90%; 2021: 2.83%)</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsb96\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsb97\">(271)<span class=\"_ _168\"> </span><span class=\"ff76\">(1<span class=\"_ _2\"></span>13)<span class=\"_ _95\"> </span>(204)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsb98\">Interest on lease liabilities<span class=\"_ _30b\"> </span><span class=\"ff75\">130<span class=\"_ _eb\"> </span></span><span class=\"lsd3 ws102\">11<span class=\"_ _0\"></span>9<span class=\"_ _eb\"> </span></span>102<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsb99\">Discounting on provisions and other liabilities<span class=\"_ _260\"> </span><span class=\"ff75\">1,293<span class=\"_ _6f\"> </span></span>645<span class=\"_ _25\"> </span>353<span class=\"_ _39c\"> </span></div><div class=\"t m0 h45 ff79 fs2 fc3 sc0 ls5 ws2 gsb9a\">Other gains and losses:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsb9b\">Fair value change on hedged loans<span class=\"_ _9f\"> </span><span class=\"ff75\">(803)<span class=\"_ _98\"> </span></span>(1,286)<span class=\"_ _95\"> </span>(779)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsb9c\">Fair value change on hedging derivatives<span class=\"_ _29a\"> </span><span class=\"ff75\">691<span class=\"_ _64\"> </span></span>1,277<span class=\"_ _6f\"> </span>704<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsb9d\">Loss on bond repurchase<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsb9e\">2</div><div class=\"t m0 h32 ff78 fs2 fc3 sc0 ls5 ws2 gsb9f\"> \u2212<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _25\"> </span><span class=\"ff76\">395<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsba0\">Exchange variations on net debt <span class=\"_ _b6\"> </span><span class=\"ff75\">9<span class=\"_ _bb\"> </span></span>(99)<span class=\"_ _14f\"> </span>99<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsba1\">Other<span class=\"_ _16d\"> </span><span class=\"ff75\">14<span class=\"_ _a\"> </span></span>16<span class=\"_ _6d\"> </span>13<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff78 fs2 fc3 sc0 ls5 ws2 gsba2\">T<span class=\"_ _2\"></span>otal financial expenses<span class=\"_ _30c\"> </span><span class=\"ff75\">2,060<span class=\"_ _64\"> </span><span class=\"ff76\">1,050<span class=\"_ _64\"> </span>1,290<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsba3\">Financial income<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsba4\">Interest income <span class=\"_ _240\"> </span><span class=\"ff75\">(529)<span class=\"_ _b5\"> </span></span>(81)<span class=\"_ _10d\"> </span>(67)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff78 fs2 fc3 sc0 ls5 ws2 gsba5\">Net finance costs<span class=\"_ _169\"> </span><span class=\"ff75\">1,531<span class=\"_ _6f\"> </span><span class=\"ff76\">969<span class=\"_ _64\"> </span>1,223<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsba6\">1 <span class=\"_ _42\"> </span>Interest has been capitalised at the rate of interest applicable to the specific borrowings financing the assets under construction or<span class=\"_ _2\"></span>, where financed through general </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsba7\">borrowings, at a capitalisation rate representing the average interest rate on such borrowings. T<span class=\"_ _2a\"></span>ax relief for capitalised interest is approximately US$81 million (2022: </div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsba8\">US$34 million; 2021: US$61 million).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsba9\">2 <span class=\"_ _42\"> </span>Relates to the additional cost on settlement of two multi-currency hybrid debt repurchase programs and the unwind of the associated hedges, included in a total cash </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsbaa\">payment of US$3,402 million disclosed in repayment of interest bearing liabilities in the Consolidated Cash Flow Statement.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gsbab\">Recognition and measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbac\">Interest income is accrued using the effective interest rate method. Finance costs are expensed as incurred, except where they relate to the financing of </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbad\">construction or development of qualifying assets.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gsbae\">24 <span class=\"_ _47\"> </span>Financial risk management<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gsbaf\">24.1 <span class=\"_ _44\"> </span>Financial risks </div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gsbb0\">Financial and capital risk management strategy<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbb1\">The financial risks arising from the Group\u2019s operations comprise market, liquidity and credit risk. These risks arise in the normal course of business and </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbb2\">the Group manages its exposure to them in accordance with the Group\u2019s portfolio risk management strategy<span class=\"_ _2a\"></span>. The objective of the strategy is to support </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbb3\">the delivery of the Group\u2019s financial targets, while protecting its future financial security and flexibility by taking advantage of the natural diversification </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbb4\">provided by the scale, diversity and flexibility of the Group\u2019s operations and activities.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbb5\">As part of the risk management strategy<span class=\"_ _2\"></span>, the Group monitors target gearing levels and credit rating metrics under a range of dif<span class=\"_ _2\"></span>ferent stress test scenarios </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbb6\">incorporating operational and macroeconomic factors.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gsbb7\">Market risk management<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbb8\">The Group\u2019s activities expose it to market risks associated with movements in interest rates, foreign currencies and commodity prices. Under the strategy </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbb9\">outlined above, the Group seeks to achieve financing costs, currency impacts, input costs and commodity prices on a floating or index basis. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbba\">In executing the strategy<span class=\"_ _2\"></span>, financial instruments are potentially employed in three distinct but related activities. <span class=\"_ _2\"></span>The following table summarises these </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbbb\">activities and the key risk management processes: </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsbbc\">Activity<span class=\"_ _296\"> </span>Key risk management processes<span class=\"_ _39c\"> </span></div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gsbbd\">1 Risk mitigation </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbbe\">On an exception basis, hedging for the purposes of mitigating risk related to specific and significant </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbbf\">expenditure on investments or capital projects will be executed if necessary to support the Group\u2019s </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbc0\">strategic objectives.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbc1\">Execution of transactions within </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbc2\">approved mandates.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gsbc3\">2 Economic hedging of commodity sales, operating costs, short-term cash deposits, </div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gsbc4\">other monetary items and debt instruments </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbc5\">Where Group commodity production is sold to customers on pricing terms that deviate from the </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbc6\">relevant index target and where a relevant derivatives market exists, financial instruments may </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbc7\">be executed as an economic hedge to align the revenue price exposure with the index target and </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbc8\">US dollars.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbc9\">Where debt is issued in a currency other than the US dollar and/or at a fixed interest rate, fair value </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbca\">and cash flow hedges may be executed to align the debt exposure with the Group\u2019s functional </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbcb\">currency of US dollars and/or to swap to a floating interest rate.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbcc\">Where short-term cash deposits and other monetary items are denominated in a currency other than </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbcd\">US dollars, derivative financial instruments may be executed to align the foreign exchange exposure to </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbce\">the Group\u2019s functional currency of US dollars.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbcf\">Measuring and reporting the exposure in </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbd0\">customer commodity contracts and issued </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbd1\">debt instruments.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbd2\">Executing hedging derivatives to align the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbd3\">total group exposure to the index target.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbd4\">Execution of transactions within </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbd5\">approved mandates.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h7 ff78 fs5 fc3 sc0 ls5 ws2 gsbd6\">3 Strategic financial transactions<span class=\"ff75\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbd7\">Opportunistic transactions may be executed with financial instruments to capture value from perceived </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbd8\">market over/under valuations. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbd9\">Execution of transactions within </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbda\">approved mandates.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbdb\">Primary responsibility for the identification and control of financial risks, including authorising and monitoring the use of financial instruments for the above </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbdc\">activities and stipulating policy thereon, rests with the Financial Risk Management Committee under authority delegated by the Chief Executive Officer<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc2 sc0 ls5 ws2 gsbde\">Interest rate risk </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls6 ws2 gsbdf\">The Group is exposed to interest rate risk on its outstanding borrowings and short-term cash deposits from the possibility that changes in interest rates will affect </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls6 ws5 gsbe0\">future cash <span class=\"_ _2\"></span>flows or the <span class=\"_ _2\"></span>fair value <span class=\"_ _2\"></span>of fixed interest <span class=\"_ _2\"></span>rate financial instruments. <span class=\"_ _2\"></span>Interest rate <span class=\"_ _2\"></span>risk is managed <span class=\"_ _2\"></span>as part of <span class=\"_ _2\"></span>the portfolio <span class=\"_ _2\"></span>risk management strategy<span class=\"_ _2a\"></span>. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbe1\">The majority of the Group\u2019s debt is issued at fixed interest rates. <span class=\"_ _2\"></span>The Group has also drawn on a facility of US$5.0 billion to fund the acquisition of OZL </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbe2\">that was referenced to floating rates. The Group has entered into interest rate swaps and cross currency interest rate swaps to convert most of its fixed </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbe3\">interest rate exposure to floating US dollar interest rate exposure. <span class=\"_ _2\"></span>As at 30 June 2023, 98 per cent of the Group\u2019s borrowings were exposed to floating </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbe4\">interest rates inclusive of the effect of swaps (2022: 80 per cent). </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbe5\">The fair value of interest rate swaps and cross currency interest rate swaps in hedge relationships used to hedge both interest rate and foreign currency </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbe6\">risks are shown in the valuation hierarchy in section 24.4 \u2018Derivatives and hedge accounting\u2019.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbe7\">Based on the net debt position as at 30 June 2023, taking into account interest rate swaps and cross currency interest rate swaps, it is estimated that a </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbe8\">one percentage point increase in the Secured Overnight Financing Rate (SOFR) interest rate will decrease the Group\u2019s equity and profit after taxation by </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbe9\">US$58 million (2022: increase of US$29 million). This assumes the change in interest rates is effective from the beginning of the financial year and the </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbea\">fixed/floating mix and balances are constant over the year<span class=\"_ _2\"></span>. </div><div class=\"t m0 h135 ff79 fs5 fc2 sc0 ls5 ws2 gsbeb\">Interest Rate Benchmark Reform<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbec\">The London Interbank Offered Rate (LIBOR) and other benchmark interest rates are being replaced by alternative risk-free rates (ARR) as part of inter-<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbed\">bank offer rate (IBOR) reform. Sterling LIBOR ceased to be published on 1 January 2022 and USD LIBOR will no longer be published after 30 June 2023.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbee\">Amendments to IFRS 9/AASB 9 \u2018Financial Instruments\u2019, IFRS 7/AASB 7 \u2018Financial Instruments: Disclosures\u2019<span class=\"_ _2\"></span> and IFRS 16/AASB 16 \u2018Leases\u2019 in relation </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbef\">to IBOR reform early adopted by the Group in previous periods impact the Group\u2019s cross currency and interest rate swaps, which prior to IBOR reform </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbf0\">referenced the US LIBOR benchmark, and the associated hedge accounting. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbf1\">These amendments provide relief from applying certain hedge accounting requirements to hedging arrangements directly impacted by IBOR reform. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbf2\">In particular<span class=\"_ _2\"></span>, where changes to the Group\u2019s instruments arise solely as a result of IBOR reform and do not change the economic substance of the Group\u2019<span class=\"_ _2\"></span>s </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbf3\">arrangements, the Group is able to maintain its existing hedge relationships and accounting. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbf4\">During the year ended 30 June 2023, the Group actively transitioned all impacted cross currency and interest rate swaps from US LIBOR to the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbf5\">alternative, widely adopted SOFR benchmark. <span class=\"_ _2\"></span>As the transition resulted solely from IBOR reform, the Group has applied the relief available in IFRS 9 and </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbf6\">continues to apply hedge accounting to its hedging arrangements, including accounting for ineffectiveness. Refer to section 24.4 \u2018Derivatives and hedge </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbf7\">accounting\u2019<span class=\"_ _2\"></span> for further information. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbf8\">The Group does not hold any material lease arrangements that contain reference to the existing benchmarks and as a result there is no material impact </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbf9\">on lease liabilities or right-of-use assets at 30 June 2023. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbfa\">The Group\u2019s revolving credit facility was restructured to reference to <span class=\"_ _2\"></span>Alternative Reference Rates (ARRs) and remains undrawn. Furthermore, in the </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsbfb\">period, Escondida has executed new SOFR linked loans and has amended existing US LIBOR linked loans with lenders, so that the applicable floating </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbfc\">interest rate reference 3M or 6M T<span class=\"_ _50\"></span>erm SOFR rates. </div><div class=\"t m0 h8 ff76 fs5 fc2 sc0 ls5 ws2 gsbfd\">Currency risk<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbfe\">The US dollar is the predominant functional currency within the Group and as a result, currency exposures arise from transactions and balances in </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsbff\">currencies other than the US dollar<span class=\"_ _2\"></span>. The Group\u2019<span class=\"_ _2\"></span>s potential currency exposures comprise:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsc00\">\u2013  <span class=\"ff76\">translational exposure in respect of non-functional currency monetary items </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsc01\">\u2013  <span class=\"ff76\">transactional exposure in respect of non-functional currency expenditure and revenues </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsc02\">The Group\u2019s foreign currency risk is managed as part of the portfolio risk management strategy<span class=\"_ _2a\"></span>. </div><div class=\"t m0 h135 ff79 fs5 fc2 sc0 ls5 ws2 gsc03\">T<span class=\"_ _2\"></span>ranslational exposure in respect of non-functional currency monetary items<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls46 ws4b gsc04\">Monetary items, including financial <span class=\"_ _2\"></span>assets and liabilities, denominated in <span class=\"_ _2\"></span>currencies other than the functional <span class=\"_ _2\"></span>currency of an operation are restated <span class=\"_ _2\"></span>at the end </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsc05\">of each reporting period to US dollar equivalents and the associated gain or loss is taken to the income statement. The exception is foreign exchange gains </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsc06\">or losses on foreign currency denominated provisions for closure and rehabilitation at operating sites, which are capitalised in property<span class=\"_ _2\"></span>, plant and equipment. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls46 ws4b gsc07\">The Group has entered <span class=\"_ _2\"></span>into cross currency interest rate <span class=\"_ _2\"></span>swaps and foreign exchange forwards <span class=\"_ _2\"></span>to convert its significant foreign currency <span class=\"_ _2\"></span>exposures in respect </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls46 ws4b gsc08\">of monetary items into <span class=\"_ _2\"></span>US dollars. Fluctuations in foreign <span class=\"_ _2\"></span>exchange rates are therefore not <span class=\"_ _2\"></span>expected to have a significant impact <span class=\"_ _2\"></span>on equity and profit after <span class=\"_ _2\"></span>tax.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsc09\">The following table shows the carrying values of financial assets and liabilities at the end of the reporting period denominated in currencies other than the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsc0a\">US dollar that are exposed to foreign currency risk:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff78 fs3 fc3 sc0 ls5 ws2 gsc0b\">Net financial (liabilities)/assets \u2013 by currency of denomination<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsc0c\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsc0d\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsc0e\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsc0f\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsc10\">AUD<span class=\"_ _30d\"> </span><span class=\"ff75\">(4,168)<span class=\"_ _13\"> </span></span>(3,649)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsc11\">CLP<span class=\"_ _30e\"> </span><span class=\"ff75\">(74)<span class=\"_ _95\"> </span></span>(602)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsc12\">GBP<span class=\"_ _30f\"> </span><span class=\"ff75\">353<span class=\"_ _25\"> </span></span>388<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsc13\">EUR<span class=\"_ _30f\"> </span><span class=\"ff75\">217<span class=\"_ _25\"> </span></span>280<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsc14\">Other<span class=\"_ _310\"> </span><span class=\"ff75\">43<span class=\"_ _25\"> </span></span>187<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsc15\">T<span class=\"_ _2\"></span>otal<span class=\"_ _2b8\"> </span>(3,629)<span class=\"_ _119\"> </span><span class=\"ff76\">(3,396)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsc16\">The principal non-functional currencies to which the Group is exposed are the <span class=\"_ _2\"></span>Australian dollar<span class=\"_ _2\"></span>, the Chilean peso, the Pound sterling and the Euro. Based on </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls46 ws4b gsc17\">the Group\u2019s <span class=\"_ _2\"></span>net financial assets and liabilities <span class=\"_ _2\"></span>as at 30 June 2023, a <span class=\"_ _2\"></span>weakening of the US dollar <span class=\"_ _2\"></span>against these currencies (one cent <span class=\"_ _2\"></span>strengthening in </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls46 ws2 gsc18\">Australian dollar<span class=\"_ _2\"></span>, 10 pesos strengthening in Chilean peso, one penny strengthening in Pound sterling and one cent strengthening in Euro), with all other </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls46 ws4b gsc19\">variables held constant, would <span class=\"_ _2\"></span>decrease the Group\u2019s <span class=\"_ _2\"></span>equity and profit after taxation by <span class=\"_ _2\"></span>US$15 million (2022: decrease of <span class=\"_ _2\"></span>US$16 million).<span class=\"_ _39c\"> </span></div>T<span class=\"_ _2\"></span>ransactional exposure in respect of non-functional currency expenditure and revenues<span class=\"_ _39c\"> </span>Certain operating and capital expenditure is incurred in currencies other than an operation\u2019s functional currency<span class=\"_ _2a\"></span>. T<span class=\"_ _2a\"></span>o a lesser extent, certain sales revenue is earned in currencies other than the functional currency of operations and certain exchange control restrictions may require that funds be maintained in currencies other than the functional currency of the operation. These currency risks are managed as part of the portfolio risk management strategy<span class=\"_ _2a\"></span>. The Group may enter into forward exchange contracts when required under this strategy<span class=\"_ _2\"></span>. Commodity price risk The risk associated with commodity prices is managed as part of the portfolio risk management strategy<span class=\"_ _2\"></span>. Substantially all of the Group\u2019<span class=\"_ _2\"></span>s commodity production is sold on market-based index pricing terms, with derivatives used from time to time to achieve a specific outcome.<span class=\"_ _39c\"> </span>Financial instruments with commodity price risk comprise forward commodity and other derivative contracts with net liabilities at fair value of US$20 million (2022: net liabilities of US$56 million). Provisionally priced commodity sales and purchases contracts<span class=\"_ _39c\"> </span>Provisionally priced sales or purchases volumes are those for which price finalisation, referenced to the relevant index, is outstanding at the reporting date. Provisional pricing mechanisms within these sales and purchases arrangements have the character of a commodity derivative. T<span class=\"_ _2\"></span>rade receivables or payables under these contracts are carried at fair value through profit or loss using Level 2 valuation inputs based on forecast selling prices in the quotation period. The Group\u2019<span class=\"_ _2\"></span>s exposure at 30 June 2023 to the impact of movements in commodity prices upon provisionally invoiced sales and purchases volumes was predominately around copper<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span>The Group had 314 thousand tonnes of copper exposure as at 30 June 2023 (2022: 289 thousand tonnes) that was provisionally priced. The final price of these sales and purchases volumes will be determined during the first half of FY2024. <span class=\"_ _2\"></span>A<span class=\"_ _2\"></span> 10 per cent change in the price of copper realised on the provisionally priced sales, with all other factors held constant, would increase or decrease profit after taxation by US$184 million (2022: US$162 million). The relationship between commodity prices and foreign currencies is complex and movements in foreign exchange rates can impact commodity prices.<span class=\"_ _39c\"> </span>Liquidity risk<span class=\"_ _39c\"> </span>Refer to note 21 \u2018Net debt\u2019<span class=\"_ _2\"></span> for details on the Group\u2019s liquidity risk. Credit risk<span class=\"_ _39c\"> </span>Credit risk is the risk that a counterparty will not meet its obligations under a financial instrument or customer contract, leading to a financial loss. The Group is exposed to credit risk from its operating activities (primarily from customer receivables) and from its financing activities, including deposits with banks and financial institutions, other short-term investments, interest rate and currency derivative contracts and other financial instruments.<span class=\"_ _39c\"> </span>Refer to note 8 \u2018T<span class=\"_ _2\"></span>rade and other receivables\u2019 and note 21 \u2018Net debt\u2019<span class=\"_ _2\"></span> for details on the Group credit risk.<span class=\"_ _39c\"> </span>24.2 Recognition and measurement All financial assets and liabilities, other than derivatives and trade receivables, are initially recognised at the fair value of consideration paid or received, net of transaction costs as appropriate. Financial assets are initially recognised on their trade date.<span class=\"_ _39c\"> </span>Financial assets are subsequently carried at fair value or amortised cost based on:<span class=\"_ _39c\"> </span>\u2013  the Group\u2019s purpose, or business model, for holding the financial asset<span class=\"_ _39c\"> </span>\u2013  whether the financial asset\u2019s contractual terms give rise to cash flows that are solely payments of principal and interest<span class=\"_ _39c\"> </span>The resulting Financial Statements classifications of financial assets can be summarised as follows:<span class=\"_ _39c\"> </span>Contractual cash flows<span class=\"_ _148\"> </span><span class=\"ff75\">Business model<span class=\"_ _207\"> </span>Category<span class=\"_ _39c\"> </span></span>Solely principal and interest<span class=\"_ _1a3\"> </span><span class=\"ff77\">Hold in order to collect contractual cash flows<span class=\"_ _29\"> </span></span>Amortised cost<span class=\"_ _39c\"> </span>Solely principal and interest<span class=\"_ _1a3\"> </span><span class=\"ff77\">Hold in order to collect contractual cash flows and sell<span class=\"_ _e6\"> </span></span>Fair value through other comprehensive income<span class=\"_ _39c\"> </span>Solely principal and interest<span class=\"_ _1a3\"> </span>Hold in order to sell<span class=\"_ _1b9\"> </span><span class=\"ff77\">Fair value through profit or loss<span class=\"_ _39c\"> </span></span>Other<span class=\"_ _a3\"> </span>Any of those mentioned above<span class=\"_ _1c1\"> </span><span class=\"ff77\">Fair value through profit or loss<span class=\"_ _39c\"> </span></span>Solely principal and interest refers to the Group receiving returns only for the time value of money and the credit risk of the counterparty for financial assets held. The main exceptions for the Group are provisionally priced receivables and derivatives which are measured at fair value through profit or loss under IFRS 9.<span class=\"_ _39c\"> </span>The Group has the intention of collecting payment directly from its customers in most cases, however the Group also participates in receivables financing programs in respect of selected customers. Receivables in these portfolios which are classified as \u2018hold in order to sell\u2019, are provisionally priced receivables and are therefore held at fair value through profit or loss prior to sale to the financial institution.<span class=\"_ _39c\"> </span>With the exception of derivative contracts and provisionally priced trade payables which are carried at fair value through profit or loss, the Group\u2019s financial liabilities are classified as subsequently measured at amortised cost. The Group may in addition elect to designate certain financial assets or liabilities at fair value through profit or loss or to apply hedge accounting where they are not mandatorily held at fair value through profit or loss.<span class=\"_ _39c\"> </span>Fair value measurement<span class=\"_ _39c\"> </span>The carrying amount of financial assets and liabilities measured at fair value is principally calculated based on inputs other than quoted prices that are observable for these financial assets or liabilities, either directly (i.e. as unquoted prices) or indirectly (i.e. derived from prices). Where no price information is available from a quoted market source, alternative market mechanisms or recent comparable transactions, fair value is estimated based on the Group\u2019s views on relevant future prices, net of valuation allowances to accommodate liquidity<span class=\"_ _2\"></span>, modelling and other risks implicit in such estimates. The inputs used in fair value calculations are determined by the relevant segment or function. The functions support the assets and operate under a defined set of accountabilities authorised by the Executive Leadership T<span class=\"_ _50\"></span>eam. Movements in the fair value of financial assets and liabilities may be recognised through the income statement or in other comprehensive income according to the designation of the underlying instrument.<span class=\"_ _39c\"> </span> For financial assets and liabilities carried at fair value, the Group uses the following to categorise the inputs to the valuation method used based on the lowest level input that is significant to the fair value measurement as a whole:<span class=\"_ _39c\"> </span>IFRS 13 Fair value hierarchy<span class=\"_ _19c\"> </span>Level 1<span class=\"_ _1dc\"> </span>Level 2<span class=\"_ _11d\"> </span>Level 3<span class=\"_ _39c\"> </span>V<span class=\"_ _2\"></span>aluation inputs<span class=\"_ _74\"> </span>Based on quoted prices (unadjusted) in active markets for identical financial assets and liabilities.<span class=\"_ _39c\"> </span>Based on inputs other than quoted prices included within Level 1 that are observable for the financial asset or liability<span class=\"_ _2\"></span>, either directly (i.e. as unquoted prices) or indirectly (i.e. derived from prices).<span class=\"_ _39c\"> </span>Based on inputs not observable in the market using appropriate valuation models, including discounted cash flow modelling.<span class=\"_ _39c\"> </span>24.3 <span class=\"_ _44\"> </span>Financial assets and liabilities<span class=\"_ _39c\"> </span>The financial assets and liabilities are presented by class in the table below at their carrying amounts.<span class=\"_ _39c\"> </span>IFRS 13 <span class=\"_ _2\"></span> Fair value hierarchy Level<span class=\"_ _39c\"> </span>1<span class=\"_ _39c\"> </span>IFRS 9 Classification<span class=\"_ _39c\"> </span>2023 <span class=\"_ _2\"></span> US$M<span class=\"_ _39c\"> </span>2022 <span class=\"_ _2\"></span> US$M<span class=\"_ _39c\"> </span>Current cross currency and interest rate swaps<span class=\"_ _39c\"> </span>2<span class=\"_ _39c\"> </span>2<span class=\"_ _23\"> </span><span class=\"ff77\">Fair value through profit or loss<span class=\"_ _311\"> </span><span class=\"ff75\">34<span class=\"_ _55\"> </span></span> \u2212<span class=\"_ _39c\"> </span></span>Current other derivative contracts<span class=\"_ _39c\"> </span>3<span class=\"_ _39c\"> </span>2,3<span class=\"_ _23\"> </span><span class=\"ff77\">Fair value through profit or loss<span class=\"_ _8d\"> </span><span class=\"ff75\">407<span class=\"_ _25\"> </span></span></span>326<span class=\"_ _39c\"> </span>Current other financial assets<span class=\"_ _1ea\"> </span><span class=\"ff76\">Amortised cost<span class=\"_ _312\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _25\"> </span></span>100<span class=\"_ _39c\"> </span></span>Current other investments<span class=\"_ _39c\"> </span>4<span class=\"_ _39c\"> </span>1,2<span class=\"_ _23\"> </span><span class=\"ff77\">Fair value through profit or loss<span class=\"_ _311\"> </span><span class=\"ff75\">29<span class=\"_ _25\"> </span></span></span>203<span class=\"_ _39c\"> </span>Non-current cross currency and interest rate swaps<span class=\"_ _39c\"> </span>2<span class=\"_ _39c\"> </span>2<span class=\"_ _23\"> </span><span class=\"ff77\">Fair value through profit or loss<span class=\"_ _8d\"> </span><span class=\"ff75\">149<span class=\"_ _25\"> </span></span></span>136<span class=\"_ _39c\"> </span>Non-current other derivative contracts<span class=\"_ _39c\"> </span>3<span class=\"_ _39c\"> </span>2,3<span class=\"_ _23\"> </span><span class=\"ff77\">Fair value through profit or loss<span class=\"_ _8d\"> </span><span class=\"ff75\">228<span class=\"_ _a\"> </span></span></span>16<span class=\"_ _39c\"> </span>Non-current other financial assets<span class=\"_ _39c\"> </span>5<span class=\"_ _39c\"> </span>3<span class=\"_ _23\"> </span><span class=\"ff77\">Fair value through profit or loss<span class=\"_ _8d\"> </span><span class=\"ff75\">246<span class=\"_ _25\"> </span></span></span>273<span class=\"_ _39c\"> </span>Non-current investment in shares<span class=\"_ _a8\"> </span>1,3<span class=\"_ _23\"> </span>Fair value through other comprehensive income<span class=\"_ _39c\"> </span>224<span class=\"_ _25\"> </span><span class=\"ff76\">138<span class=\"_ _39c\"> </span></span>Non-current other investments<span class=\"_ _39c\"> </span>4<span class=\"_ _39c\"> </span>1,2<span class=\"_ _23\"> </span><span class=\"ff77\">Fair value through profit or loss<span class=\"_ _8d\"> </span><span class=\"ff75\">268<span class=\"_ _25\"> </span></span></span>239<span class=\"_ _39c\"> </span>T<span class=\"_ _2a\"></span>otal other financial assets<span class=\"_ _313\"> </span><span class=\"ff75\">1,585<span class=\"_ _64\"> </span><span class=\"ff76\">1,431<span class=\"_ _39c\"> </span></span></span>Cash and cash equivalents<span class=\"_ _314\"> </span>Amortised cost<span class=\"_ _253\"> </span><span class=\"ff75\">12,428<span class=\"_ _242\"> </span></span>17,236<span class=\"_ _39c\"> </span>T<span class=\"_ _2\"></span>rade and other receivables<span class=\"_ _39c\"> </span>6<span class=\"_ _39c\"> </span>Amortised cost<span class=\"_ _11c\"> </span><span class=\"ff75\">1,506<span class=\"_ _64\"> </span></span>1,674<span class=\"_ _39c\"> </span>Provisionally priced trade receivables<span class=\"_ _6e\"> </span>2<span class=\"_ _23\"> </span><span class=\"ff77\">Fair value through profit or loss<span class=\"_ _2be\"> </span><span class=\"ff75\">2,705<span class=\"_ _140\"> </span></span></span>3,478<span class=\"_ _39c\"> </span>T<span class=\"_ _2\"></span>otal financial assets<span class=\"_ _315\"> </span><span class=\"ff75\">18,224<span class=\"_ _242\"> </span><span class=\"ff76\">23,819<span class=\"_ _39c\"> </span></span></span>Non-financial assets<span class=\"_ _316\"> </span><span class=\"ff75\">83,072<span class=\"_ _242\"> </span><span class=\"ff76\">71,347<span class=\"_ _39c\"> </span></span></span>T<span class=\"_ _2a\"></span>otal assets<span class=\"_ _285\"> </span><span class=\"ff75\">101,296<span class=\"_ _1c\"> </span></span>95,166<span class=\"_ _39c\"> </span>Current cross currency and interest rate swaps<span class=\"_ _39c\"> </span>2<span class=\"_ _39c\"> </span>2<span class=\"_ _23\"> </span><span class=\"ff77\">Fair value through profit or loss<span class=\"_ _8d\"> </span><span class=\"ff75\">147<span class=\"_ _25\"> </span></span></span>358<span class=\"_ _39c\"> </span>Current other derivative contracts<span class=\"_ _317\"> </span>2<span class=\"_ _23\"> </span><span class=\"ff77\">Fair value through profit or loss<span class=\"_ _8d\"> </span><span class=\"ff75\">176<span class=\"_ _eb\"> </span></span></span><span class=\"lsd3 ws102\">11<span class=\"_ _0\"></span>8<span class=\"_ _39c\"> </span></span>Current other financial liabilities<span class=\"_ _39c\"> </span>7<span class=\"_ _39c\"> </span>Amortised cost<span class=\"_ _1e0\"> </span><span class=\"ff75\">79<span class=\"_ _25\"> </span></span>103<span class=\"_ _39c\"> </span>Non-current cross currency and interest rate swaps<span class=\"_ _39c\"> </span>2<span class=\"_ _39c\"> </span>2<span class=\"_ _23\"> </span><span class=\"ff77\">Fair value through profit or loss<span class=\"_ _1f\"> </span><span class=\"ff75\">1,608<span class=\"_ _64\"> </span></span></span>1,466<span class=\"_ _39c\"> </span>Non-current other derivative contracts<span class=\"_ _39c\"> </span>3<span class=\"_ _39c\"> </span>2,3<span class=\"_ _23\"> </span><span class=\"ff77\">Fair value through profit or loss<span class=\"_ _311\"> </span><span class=\"ff75\">82<span class=\"_ _a\"> </span></span></span>31<span class=\"_ _39c\"> </span>Non-current other financial liabilities<span class=\"_ _39c\"> </span>7<span class=\"_ _39c\"> </span>Amortised cost<span class=\"_ _83\"> </span><span class=\"ff75\">467<span class=\"_ _6f\"> </span></span>500<span class=\"_ _39c\"> </span>T<span class=\"_ _2a\"></span>otal other financial liabilities<span class=\"_ _318\"> </span><span class=\"ff75\">2,559<span class=\"_ _64\"> </span><span class=\"ff76\">2,576<span class=\"_ _39c\"> </span></span></span>T<span class=\"_ _2\"></span>rade and other payables<span class=\"_ _39c\"> </span>8<span class=\"_ _39c\"> </span>Amortised cost<span class=\"_ _11c\"> </span><span class=\"ff75\">5,338<span class=\"_ _64\"> </span></span>5,223<span class=\"_ _39c\"> </span>Provisionally priced trade payables<span class=\"_ _319\"> </span>2<span class=\"_ _23\"> </span><span class=\"ff77\">Fair value through profit or loss<span class=\"_ _8d\"> </span><span class=\"ff75\">841<span class=\"_ _64\"> </span></span></span>1,385<span class=\"_ _39c\"> </span>Bank overdrafts and short-term borrowings<span class=\"_ _39c\"> </span>9<span class=\"_ _39c\"> </span>Amortised cost<span class=\"_ _2fc\"> </span><span class=\"ff75\">5<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _39c\"> </span></span></span>Bank loans<span class=\"_ _39c\"> </span>9<span class=\"_ _39c\"> </span>Amortised cost<span class=\"_ _11c\"> </span><span class=\"ff75\">7,502<span class=\"_ _64\"> </span></span>2,472<span class=\"_ _39c\"> </span>Notes and debentures<span class=\"_ _39c\"> </span>9<span class=\"_ _39c\"> </span>Amortised cost<span class=\"_ _1dc\"> </span><span class=\"ff75\">1<span class=\"_ _2\"></span>1,819<span class=\"_ _1a\"> </span><span class=\"ff76\">1<span class=\"_ _2\"></span>1,363<span class=\"_ _39c\"> </span></span></span>Lease liabilities<span class=\"_ _39c\"> </span>10<span class=\"_ _39c\"> </span>3,019<span class=\"_ _64\"> </span><span class=\"ff76\">2,576<span class=\"_ _39c\"> </span></span>Other<span class=\"_ _39c\"> </span>9<span class=\"_ _39c\"> </span>Amortised cost<span class=\"_ _157\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _6d\"> </span></span>17<span class=\"_ _39c\"> </span>T<span class=\"_ _2\"></span>otal financial liabilities<span class=\"_ _313\"> </span><span class=\"ff75\">31,083<span class=\"_ _242\"> </span><span class=\"ff76\">25,612<span class=\"_ _39c\"> </span></span></span>Non-financial liabilities<span class=\"_ _262\"> </span><span class=\"ff75\">21,683<span class=\"_ _1c\"> </span><span class=\"ff76\">20,788<span class=\"_ _39c\"> </span></span></span>T<span class=\"_ _2a\"></span>otal liabilities<span class=\"_ _31a\"> </span><span class=\"ff75\">52,766<span class=\"_ _242\"> </span></span>46,400<span class=\"_ _39c\"> </span>1 <span class=\"_ _42\"> </span>All of the Group\u2019s financial assets and financial liabilities recognised at fair value were valued using market observable inputs categorised as Level 2 unless specified otherwise in the following footnotes.<span class=\"_ _39c\"> </span>2 <span class=\"_ _42\"> </span>Cross currency and interest rate swaps are valued using market data including interest rate curves and foreign exchange rates. <span class=\"_ _2\"></span>A<span class=\"_ _2\"></span> discounted cash flow approach is used to derive the fair value of cross currency and interest rate swaps at the reporting date. 3 <span class=\"_ _42\"> </span>Includes net other derivative assets of US$46 million related to power purchase contract agreements that are categorised as Level 3 (2022: US$ nil).<span class=\"_ _39c\"> </span>4 <span class=\"_ _42\"> </span>Includes investments held by BHP Foundation which are restricted and not available for general use by the Group of US$290 million (2022: US$252 million) of which other investments (mainly US T<span class=\"_ _2\"></span>reasury Notes) of US$138 million categorised as Level 1 (2022: US$1<span class=\"_ _2\"></span>19 million). 5 <span class=\"_ _42\"> </span>Includes receivables contingent on outcome of future events relating to mining and regulatory approvals of US$246 million (2022: US$233 million).<span class=\"_ _39c\"> </span>6 <span class=\"_ _42\"> </span>Excludes input taxes of US$531 million (2022: US$427 million) included in other receivables.<span class=\"_ _39c\"> </span>7 <span class=\"_ _42\"> </span>Includes the discounted settlement liability in relation to the cancellation of power contracts at the Group\u2019s Escondida operations. 8 <span class=\"_ _42\"> </span>Excludes input taxes of US$121 million (2022: US$79 million) included in other payables.<span class=\"_ _39c\"> </span>9 <span class=\"_ _42\"> </span>All interest bearing liabilities, excluding lease liabilities, are unsecured.<span class=\"_ _39c\"> </span>10  Lease liabilities are measured in accordance with IFRS 16/AASB 16 \u2018Leases\u2019.<span class=\"_ _39c\"> </span>The carrying amounts in the table above generally approximate to fair value. In the case of US$534 million (2022: US$3,018 million) of fixed rate debt not swapped to floating rate, the fair value at 30 June 2023 was US$538 million (2022: US$3,126 million). The fair value is determined using a method that can be categorised as Level 2 and uses inputs based on benchmark interest rates, alternative market mechanisms or recent comparable transactions.<span class=\"_ _39c\"> </span>For financial instruments that are carried at fair value on a recurring basis, the Group determines whether transfers have occurred between levels in the fair value hierarchy by reassessing categorisation at the end of each reporting period. There were no transfers between categories during the period.<span class=\"_ _39c\"> </span>Offsetting financial assets and liabilities<span class=\"_ _39c\"> </span>The Group enters into money market deposits and derivative transactions under International Swaps and Derivatives <span class=\"_ _2\"></span>Association master netting agreements that do not meet the offsetting criteria in IAS 32/AASB 132 \u2018Financial Instruments: Presentation\u2019, but allow for the related amounts to be set-<span class=\"_ _39c\"> </span>off in certain circumstances. <span class=\"_ _2\"></span>The amounts set out as cross currency and interest rate swaps in the table above represent the derivative financial assets and liabilities of the Group that may be subject to the above arrangements and are presented on a gross basis.<span class=\"_ _39c\"> </span>24.4 <span class=\"_ _44\"> </span>Derivatives and hedge accounting<span class=\"_ _39c\"> </span>The Group uses derivatives to hedge its exposure to certain market risks and may elect to apply hedge accounting.<span class=\"_ _39c\"> </span>Hedge accounting<span class=\"_ _39c\"> </span>Derivatives are included within financial assets or liabilities at fair value through profit or loss unless they are designated as effective hedging instruments. Financial instruments in this category are classified as current if they are due or expected to be settled within 12 months otherwise they are classified as non-current.<span class=\"_ _39c\"> </span>Where hedge accounting is applied, at the start of the transaction, the Group documents the type of hedge, the relationship between the hedging instrument and hedged items and its risk management objective and strategy for undertaking various hedge transactions. The documentation also demonstrates that the hedge is expected to be effective. The Group applies the following types of hedge accounting to its derivatives hedging the interest rate and currency risks of its notes and debentures:<span class=\"_ _39c\"> </span>\u2013  Fair value hedges \u2013 the fair value gain or loss on interest rate and cross currency swaps relating to interest rate risk, together with the change in the fair value of the hedged fixed rate borrowings attributable to interest rate risk are recognised immediately in the income statement. If the hedge no longer meets the criteria for hedge accounting, the fair value adjustment on the note or debenture is amortised to the income statement over the period to maturity using a recalculated effective interest rate.<span class=\"_ _39c\"> </span>\u2013  Cash flow hedges \u2013 changes in the fair value of cross currency interest rate swaps which hedge foreign currency cash flows on the notes and debentures are recognised directly in other comprehensive income and accumulated in the cash flow hedging reserve. T<span class=\"_ _50\"></span>o the extent a hedge is ineffective, changes in fair value are recognised immediately in the income statement. When a hedging instrument expires, or is sold, terminated or exercised, or when a hedge no longer meets the criteria for hedge accounting, any cumulative gain or loss existing in equity at that time remains in equity and is amortised to the income statement over the period to the hedged item\u2019s maturity<span class=\"_ _2a\"></span>.<span class=\"_ _39c\"> </span>When hedged, the Group hedges the full notional value of notes or debentures. However<span class=\"_ _2\"></span>, certain components of the fair value of derivatives are not permitted under IFRS 9 to be included in the hedge accounting above. Certain costs of hedging are permitted to be recognised in other comprehensive income. <span class=\"_ _2\"></span>Any change in the fair value of a derivative that does not qualify for hedge accounting, or is ineffective in hedging the designated risk due to contractual differences between the hedged item and hedging instrument, is recognised immediately in the income statement.<span class=\"_ _39c\"> </span>The table below shows the carrying amounts of the Group\u2019s notes and debentures by currency and the derivatives which hedge them: \u2013  <span class=\"ff76\">The carrying amount of the notes and debentures includes foreign exchange remeasurement to period-end rates and fair value adjustments when </span>included in a fair value hedge. \u2013  <span class=\"ff76\">The breakdown of the hedging derivatives includes remeasurement of foreign currency notional values at period-end rates, fair value movements </span>due to interest rate risk, foreign currency cash flows designated into cash flow hedges, costs of hedging recognised in other comprehensive income, ineffectiveness recognised in the income statement and accruals or prepayments. \u2013  <span class=\"ff76\">The hedged value of notes and debentures includes their carrying amounts adjusted for the offsetting derivative fair value movements due to foreign </span>currency and interest rate risk remeasurement. 2023  US$M<span class=\"_ _39c\"> </span>Carrying amount of notes and debentures Fair value of derivatives<span class=\"_ _39c\"> </span>Hedged value of notes and debentures<span class=\"_ _39c\"> </span>2<span class=\"_ _39c\"> </span>Foreign exchange notional at spot rates Interest <span class=\"_ _2\"></span> rate risk<span class=\"_ _39c\"> </span>Recognised in cash flow hedging reserve<span class=\"_ _39c\"> </span>Recognised <span class=\"_ _2\"></span> in cost of hedging reserve<span class=\"_ _39c\"> </span>Recognised in <span class=\"_ _2\"></span> the income statement<span class=\"_ _39c\"> </span>1<span class=\"_ _39c\"> </span>Accrued <span class=\"_ _2\"></span> cash flows<span class=\"_ _36\"> </span><span class=\"ff75\">T<span class=\"_ _2\"></span>otal<span class=\"_ _39c\"> </span></span>A<span class=\"_ _1fc\"> </span>B<span class=\"_ _16\"> </span>C<span class=\"_ _16\"> </span>D<span class=\"_ _200\"> </span>E<span class=\"_ _74\"> </span>F<span class=\"_ _68\"> </span>G<span class=\"_ _1a\"> </span>B to G<span class=\"_ _f2\"> </span>A + B + C<span class=\"_ _39c\"> </span>USD<span class=\"_ _5a\"> </span><span class=\"ff75\">7,245<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _25\"> </span></span>214<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _6d\"> </span></span>32<span class=\"_ _a\"> </span>23<span class=\"_ _25\"> </span>269<span class=\"_ _140\"> </span>7,459<span class=\"_ _39c\"> </span></span>GBP<span class=\"_ _5a\"> </span><span class=\"ff75\">1,566<span class=\"_ _25\"> </span>522<span class=\"_ _25\"> </span>274<span class=\"_ _6d\"> </span>24<span class=\"_ _55\"> </span>(9)<span class=\"_ _b5\"> </span>(69)<span class=\"_ _14f\"> </span>35<span class=\"_ _25\"> </span>777<span class=\"_ _140\"> </span>2,362<span class=\"_ _39c\"> </span></span>EUR<span class=\"_ _5a\"> </span><span class=\"ff75\">3,008<span class=\"_ _25\"> </span>434<span class=\"_ _25\"> </span>302<span class=\"_ _61\"> </span>(39)<span class=\"_ _bb\"> </span>10<span class=\"_ _61\"> </span>(49)<span class=\"_ _95\"> </span>(132)<span class=\"_ _c8\"> </span>526<span class=\"_ _64\"> </span>3,744<span class=\"_ _39c\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _6\"> </span>11,819<span class=\"_ _25\"> </span>956<span class=\"_ _25\"> </span>790<span class=\"_ _61\"> </span>(15)<span class=\"_ _105\"> </span>1<span class=\"_ _61\"> </span>(86)<span class=\"_ _b5\"> </span>(74)<span class=\"_ _b8\"> </span>1,572<span class=\"_ _1c\"> </span>13,565<span class=\"_ _39c\"> </span>2022  US$M<span class=\"_ _39c\"> </span>Carrying <span class=\"_ _2\"></span> amount of <span class=\"_ _2\"></span> notes and debentures Fair value of derivatives<span class=\"_ _39c\"> </span>Hedged value <span class=\"_ _2\"></span> of notes and debentures<span class=\"_ _39c\"> </span>2<span class=\"_ _39c\"> </span>Foreign exchange notional at <span class=\"_ _2\"></span> spot rates Interest <span class=\"_ _2\"></span> rate risk<span class=\"_ _39c\"> </span>Recognised in cash flow hedging <span class=\"_ _2\"></span> reserve<span class=\"_ _39c\"> </span>Recognised <span class=\"_ _2\"></span> in cost of hedging <span class=\"_ _2\"></span> reserve<span class=\"_ _39c\"> </span>Recognised in <span class=\"_ _2\"></span> the income statement<span class=\"_ _39c\"> </span>1<span class=\"_ _39c\"> </span>Accrued <span class=\"_ _2\"></span> cash flows<span class=\"_ _9c\"> </span><span class=\"ff76\">T<span class=\"_ _2a\"></span>otal<span class=\"_ _39c\"> </span></span>A<span class=\"_ _16\"> </span>B<span class=\"_ _16\"> </span>C<span class=\"_ _16\"> </span>D<span class=\"_ _200\"> </span>E<span class=\"_ _74\"> </span>F<span class=\"_ _68\"> </span>G<span class=\"_ _b8\"> </span>B to G<span class=\"_ _156\"> </span>A + B + C<span class=\"_ _39c\"> </span>USD<span class=\"_ _5a\"> </span>4,740<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _14f\"> </span></span>(16)<span class=\"_ _b0\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span></span>(7)<span class=\"_ _bb\"> </span>86<span class=\"_ _6d\"> </span>63<span class=\"_ _64\"> </span>4,724<span class=\"_ _39c\"> </span>GBP<span class=\"_ _5a\"> </span>2,599<span class=\"_ _25\"> </span>796<span class=\"_ _1b\"> </span>(1<span class=\"_ _2\"></span>15)<span class=\"_ _10d\"> </span>(35)<span class=\"_ _bb\"> </span>13<span class=\"_ _6d\"> </span>26<span class=\"_ _a\"> </span>42<span class=\"_ _25\"> </span>727<span class=\"_ _140\"> </span>3,280<span class=\"_ _39c\"> </span>EUR<span class=\"_ _5a\"> </span>3,449<span class=\"_ _25\"> </span>585<span class=\"_ _eb\"> </span><span class=\"lsd3 ws102\">11<span class=\"_ _0\"></span>2<span class=\"_ _1a3\"> </span></span>(16)<span class=\"_ _c5\"> </span>8<span class=\"_ _55\"> </span>(4)<span class=\"_ _bb\"> </span>45<span class=\"_ _6f\"> </span>730<span class=\"_ _64\"> </span>4,146<span class=\"_ _39c\"> </span>CAD<span class=\"_ _31b\"> </span>575<span class=\"_ _25\"> </span>167<span class=\"_ _74\"> </span>5<span class=\"_ _55\"> </span>(8)<span class=\"_ _c5\"> </span>6<span class=\"_ _55\"> </span>(3)<span class=\"_ _c5\"> </span>1<span class=\"_ _6f\"> </span>168<span class=\"_ _25\"> </span>747<span class=\"_ _39c\"> </span>T<span class=\"_ _2a\"></span>otal<span class=\"_ _15\"> </span>1<span class=\"_ _2a\"></span>1,363<span class=\"_ _64\"> </span>1,548<span class=\"_ _61\"> </span>(14)<span class=\"_ _b5\"> </span>(59)<span class=\"_ _14f\"> </span>27<span class=\"_ _6d\"> </span>12<span class=\"_ _25\"> </span>174<span class=\"_ _64\"> </span>1,688<span class=\"_ _1c\"> </span>12,897<span class=\"_ _39c\"> </span>1 <span class=\"_ _42\"> </span>Predominantly related to ineffectiveness.<span class=\"_ _39c\"> </span>2 <span class=\"_ _42\"> </span>Includes US$534 million (2022: US$3,018 million) of fixed rate debt not swapped to floating rate that is not in a hedging relationship.<span class=\"_ _39c\"> </span>The weighted average interest rate payable is USD SOFR +1.54 per cent (2022: USD LIBOR + 1.74 per cent). Refer to note 23 \u2018Net finance costs\u2019<span class=\"_ _2\"></span> for details of net finance costs for the year<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span><div class=\"t m0 h8 ff76 fs5 fc2 sc0 ls5 ws2 gsd3c\">Movements in reserves relating to hedge accounting<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsd3d\">The following table shows a reconciliation of the components of equity and an analysis of the movements in reserves for all hedges. For a description of </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsd3e\">these reserves, refer to note 18 \u2018Other equity\u2019.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd3f\">2023  </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd40\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff78 fs3 fc3 sc0 ls5 ws2 gsd41\">Cash flow hedging reserve <span class=\"_ _1bf\"> </span><span class=\"ff75\">Cost of hedging reserve<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd42\">Gross<span class=\"_ _1fb\"> </span><span class=\"ff78 lse5 ws129\">Ta<span class=\"_ _43\"></span>x<span class=\"_ _14f\"> </span></span>Net<span class=\"_ _168\"> </span>Gross<span class=\"_ _bb\"> </span><span class=\"ff78 lse5 ws129\">Tax<span class=\"_ _61\"> </span></span>Net<span class=\"_ _61\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsd43\">At the beginning of the financial year<span class=\"_ _1b7\"> </span><span class=\"ff75\">59<span class=\"_ _14f\"> </span>(18)<span class=\"_ _14f\"> </span>41<span class=\"_ _31c\"> </span>(27)<span class=\"_ _c5\"> </span>8<span class=\"_ _14f\"> </span>(19)<span class=\"_ _ec\"> </span>22<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd44\">Add: Change in fair value of hedging </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd45\">instrument recognised in OCI<span class=\"_ _31d\"> </span><span class=\"ff75\">95<span class=\"_ _14f\"> </span>(29)<span class=\"_ _14f\"> </span>66<span class=\"_ _149\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _6a\"> </span></span>66<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsd46\">Less: Reclassified from reserves to financial </div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsd47\">expenses \u2013 recognised through OCI<span class=\"_ _5a\"> </span><span class=\"ff75\">(174)<span class=\"_ _bb\"> </span>53<span class=\"_ _9c\"> </span>(121)<span class=\"_ _6d\"> </span>26<span class=\"_ _55\"> </span>(8)<span class=\"_ _bb\"> </span>18<span class=\"_ _a\"> </span>(103)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd48\">Less: Loss/(gain) transferred to balance sheet </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd49\">related items<span class=\"_ _e3\"> </span><span class=\"ff75\">35<span class=\"_ _61\"> </span>(1<span class=\"_ _2\"></span>1)<span class=\"_ _bb\"> </span>24<span class=\"_ _149\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _6a\"> </span></span>24<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff78 fs2 fc3 sc0 ls5 ws2 gsd4a\">At the end of the financial year<span class=\"_ _17\"> </span><span class=\"ff75\">15<span class=\"_ _55\"> </span>(5)<span class=\"_ _bb\"> </span>10<span class=\"_ _149\"> </span>(1)<span class=\"_ _b0\"> </span></span> \u2212<span class=\"_ _55\"> </span><span class=\"ff75\">(1)<span class=\"_ _10e\"> </span>9<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd4b\">2022  </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd4c\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsd4d\">Cash flow hedging reserve <span class=\"_ _27\"> </span><span class=\"ff76\">Cost of hedging reserve<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd4e\">Gross<span class=\"_ _14f\"> </span><span class=\"lse2 ws122\">Ta<span class=\"_ _43\"></span>x<span class=\"_ _1a3\"> </span></span>Net<span class=\"_ _e8\"> </span>Gross<span class=\"_ _14f\"> </span><span class=\"lse2 ws122\">Ta<span class=\"_ _1\"> </span>x<span class=\"_ _1a3\"> </span></span>Net<span class=\"_ _bc\"> </span>T<span class=\"_ _2a\"></span>otal<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsd4f\">At the beginning of the financial year<span class=\"_ _cf\"> </span><span class=\"ff76\">142<span class=\"_ _61\"> </span>(42)<span class=\"_ _203\"> </span>100<span class=\"_ _31c\"> </span>(77)<span class=\"_ _14f\"> </span>23<span class=\"_ _61\"> </span>(54)<span class=\"_ _16\"> </span>46<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd50\">Add: Change in fair value of hedging </div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsd51\">instrument recognised in OCI<span class=\"_ _aa\"> </span>(914)<span class=\"_ _203\"> </span>274<span class=\"_ _9c\"> </span>(640)<span class=\"_ _68\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _a\"> </span></span>(640)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsd52\">Less: Reclassified from reserves to financial </div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsd53\">expenses \u2013 recognised through OCI<span class=\"_ _12\"> </span><span class=\"ff76\">831<span class=\"_ _9c\"> </span>(250)<span class=\"_ _c8\"> </span>581<span class=\"_ _200\"> </span>50<span class=\"_ _61\"> </span>(15)<span class=\"_ _bb\"> </span>35<span class=\"_ _55\"> </span>616<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsd54\">At the end of the financial year<span class=\"_ _292\"> </span><span class=\"ff76\">59<span class=\"_ _14f\"> </span>(18)<span class=\"_ _bb\"> </span>41<span class=\"_ _31c\"> </span>(27)<span class=\"_ _c5\"> </span>8<span class=\"_ _61\"> </span>(19)<span class=\"_ _200\"> </span>22<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff77 fs5 fc2 sc0 ls5 ws2 gsd55\">Changes in interest bearing liabilities and related derivatives resulting from financing activities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsd56\">The movement in the year in the Group\u2019s interest bearing liabilities and related derivatives are as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd57\">2023  </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd58\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd59\">Interest bearing liabilities </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd5a\">Derivatives </div><div class=\"t m0 h41 ff78 fs3 fc3 sc0 ls5 ws2 gsd5b\">liabilities/<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd5c\">(assets)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd5d\">Bank </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd5e\">loans </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd5f\">Notes and </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd60\">debentures </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd61\">Lease </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd62\">liabilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd63\">Bank </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd64\">overdraft and </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd65\">short-term </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd66\">borrowings<span class=\"_ _37\"> </span>Other<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd67\">Cross </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd68\">currency and </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd69\">interest rate </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd6a\">swaps <span class=\"_ _8f\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsd6b\">At the beginning of the financial year<span class=\"_ _108\"> </span><span class=\"ff75\">2,472<span class=\"_ _f3\"> </span>1<span class=\"_ _2\"></span>1,363<span class=\"_ _37\"> </span>2,576<span class=\"_ _2b\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _1b\"> </span></span>17<span class=\"_ _64\"> </span>1,688<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd6c\">Proceeds from interest bearing liabilities<span class=\"_ _31e\"> </span><span class=\"ff75\">5,450<span class=\"_ _21\"> </span>2,732<span class=\"_ _25\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _2b\"> </span> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _64\"> </span></span>8,182<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd6d\">Settlements of debt related instruments<span class=\"_ _fa\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _6f\"> </span> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _2b\"> </span> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _9c\"> </span><span class=\"ff75\">(677)<span class=\"_ _e\"> </span>(677)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd6e\">Repayment of interest bearing liabilities<span class=\"_ _1f1\"> </span><span class=\"ff75\">(1,087)<span class=\"_ _f5\"> </span>(1,610)<span class=\"_ _98\"> </span>(576)<span class=\"_ _6f\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _168\"> </span></span>(16)<span class=\"_ _b0\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _12a\"> </span></span>(3,289)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsd6f\">Change from Net financing cash flows<span class=\"_ _124\"> </span><span class=\"ff75\">4,363<span class=\"_ _21\"> </span>1,122<span class=\"_ _11\"> </span>(576)<span class=\"_ _6f\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _168\"> </span></span>(16)<span class=\"_ _e\"> </span>(677)<span class=\"_ _b8\"> </span>4,216<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd70\">Other movements:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd71\">Acquisition of subsidiaries and operations<span class=\"_ _4\"> </span><span class=\"ff75\">688<span class=\"_ _25\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _140\"> </span></span>423<span class=\"_ _2b\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd72\">Interest rate impacts<span class=\"_ _31f\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _12a\"> </span><span class=\"ff75\">(803)<span class=\"_ _c8\"> </span></span> \u2212<span class=\"_ _2b\"> </span> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _25\"> </span><span class=\"ff75\">691<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd73\">Foreign exchange impacts <span class=\"_ _a7\"> </span><span class=\"ff75\">(23)<span class=\"_ _12a\"> </span>128<span class=\"_ _1b\"> </span>12<span class=\"_ _2b\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _9c\"> </span></span>(127)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd74\">Lease additions<span class=\"_ _1c2\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _140\"> </span><span class=\"ff75\">542<span class=\"_ _2b\"> </span></span> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd75\">Remeasurement of index-linked freight contracts<span class=\"_ _1f\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _1b\"> </span><span class=\"ff75\">53<span class=\"_ _2b\"> </span></span> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls95 ws2 gsd76\">Other interest bearing liabilities/derivative related changes<span class=\"_ _36\"> </span><span class=\"ff75 ls5\">2<span class=\"_ _1a3\"> </span>9<span class=\"_ _db\"> </span>(11)<span class=\"_ _61\"> </span>5<span class=\"_ _25\"> </span>(1)<span class=\"_ _b0\"> </span>(3)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff78 fs2 fc3 sc0 ls5 ws2 gsd77\">At the end of the financial year<span class=\"_ _19\"> </span><span class=\"ff75\">7,502<span class=\"_ _2f\"> </span>1<span class=\"_ _2\"></span>1,819<span class=\"_ _21\"> </span>3,019<span class=\"_ _105\"> </span>5<span class=\"_ _25\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _64\"> </span></span>1,572<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd78\">2022  </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd79\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd7a\">Interest bearing liabilities </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd7b\">Derivatives </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd7c\">(assets)/<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd7d\">liabilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd7e\">Bank loans </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd7f\">Notes and </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd80\">debentures </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd81\">Lease </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd82\">liabilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd83\">Bank overdraft </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd84\">and short-term </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd85\">borrowings<span class=\"_ _98\"> </span>Other<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd86\">Cross </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd87\">currency and </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd88\">interest rate </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsd89\">swaps <span class=\"_ _db\"> </span>T<span class=\"_ _2a\"></span>otal<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsd8a\">At the beginning of the financial year<span class=\"_ _108\"> </span><span class=\"ff76\">2,260<span class=\"_ _2f\"> </span>14,769<span class=\"_ _37\"> </span>3,896<span class=\"_ _2b\"> </span></span> \u2212<span class=\"_ _154\"> </span><span class=\"ff76\">58<span class=\"_ _9c\"> </span>(557)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsd8b\">Proceeds from interest bearing liabilities<span class=\"_ _31e\"> </span>1,150<span class=\"_ _25\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _6f\"> </span> \u2212<span class=\"_ _2b\"> </span> \u2212<span class=\"_ _1b\"> </span></span>14<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _64\"> </span></span>1,164<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsd8c\">Settlements of debt related instruments<span class=\"_ _fa\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _6f\"> </span> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _2b\"> </span> \u2212<span class=\"_ _6f\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd8d\">Repayment of interest bearing liabilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsd8e\">1</div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsd8f\"> (941)<span class=\"_ _f5\"> </span>(1,232)<span class=\"_ _f5\"> </span>(1,163)<span class=\"_ _6f\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _db\"> </span></span>(55)<span class=\"_ _2b\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _12a\"> </span></span>(3,391)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsd90\">Change from Net financing cash flows<span class=\"_ _2c\"> </span><span class=\"ff76\">209<span class=\"_ _e7\"> </span>(1,232)<span class=\"_ _f5\"> </span>(1,163)<span class=\"_ _6f\"> </span></span> \u2212<span class=\"_ _db\"> </span><span class=\"ff76\">(41)<span class=\"_ _b0\"> </span></span> \u2212<span class=\"_ _12a\"> </span><span class=\"ff76\">(2,227)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsd91\">Other movements:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsd92\">Divestment and demerger of subsidiaries and operations<span class=\"_ _140\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _6f\"> </span> \u2212<span class=\"_ _12a\"> </span></span>(492)<span class=\"_ _eb\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsd93\">Interest rate impacts<span class=\"_ _31f\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _19b\"> </span></span>(1,286)<span class=\"_ _c8\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _2b\"> </span> \u2212<span class=\"_ _6f\"> </span> \u2212<span class=\"_ _64\"> </span></span>1,277<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsd94\">Foreign exchange impacts <span class=\"_ _199\"> </span>3<span class=\"_ _12a\"> </span>(894)<span class=\"_ _13\"> </span>(126)<span class=\"_ _eb\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _25\"> </span></span>(2)<span class=\"_ _c8\"> </span>898<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsd95\">Lease additions<span class=\"_ _1c2\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _140\"> </span></span>866<span class=\"_ _2b\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _6f\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsd96\">Remeasurement of index-linked freight contracts<span class=\"_ _1f\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _11\"> </span></span>(369)<span class=\"_ _6f\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _6f\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsd97\">Other interest bearing liabilities/derivative related changes<span class=\"_ _1c\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _61\"> </span></span>6<span class=\"_ _db\"> </span>(36)<span class=\"_ _6f\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _1a3\"> </span></span>2<span class=\"_ _a\"> </span>70<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsd98\">At the end of the financial year<span class=\"_ _1f0\"> </span><span class=\"ff76\">2,472<span class=\"_ _f3\"> </span>1<span class=\"_ _2\"></span>1,363<span class=\"_ _37\"> </span>2,576<span class=\"_ _2b\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _154\"> </span></span>17<span class=\"_ _64\"> </span>1,688<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsd99\">1 <span class=\"_ _42\"> </span>FY2022 includes US$33 million of Discontinued operations cash flows.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h11 ff75 fsa fc3 sc0 ls5 ws2 gsd9b\">Employee matters<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gsd9c\">25 <span class=\"_ _47\"> </span>Key management personnel<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsd9d\">Key management personnel compensation comprises:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd9e\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsd9f\">US$<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsda0\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsda1\">US$<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsda2\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsda3\">US$<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsda4\">Short-term employee benefits<span class=\"_ _2c3\"> </span><span class=\"ff75\">13,599,217<span class=\"_ _cc\"> </span><span class=\"ff76\">13,979,139<span class=\"_ _1a2\"> </span>14,081,625<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsda5\">Post-employment benefits<span class=\"_ _29d\"> </span><span class=\"ff75\">659,020<span class=\"_ _19b\"> </span><span class=\"ff76\">634,363<span class=\"_ _19b\"> </span>744,951<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsda6\">Share-based payments<span class=\"_ _320\"> </span><span class=\"ff75\">1<span class=\"_ _2\"></span>1,455,666<span class=\"_ _b\"> </span><span class=\"ff76\">1<span class=\"_ _2\"></span>1,165,439<span class=\"_ _b\"> </span>1<span class=\"_ _2\"></span>1,601,866<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gsda7\">T<span class=\"_ _2\"></span>otal<span class=\"_ _27d\"> </span>25,713,903<span class=\"_ _cc\"> </span><span class=\"ff76\">25,778,941<span class=\"_ _1a2\"> </span>26,428,442<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsda8\">Key Management Personnel (KMP) includes the roles which have the authority and responsibility for planning, directing and controlling the activities </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsda9\">of BHP<span class=\"_ _50\"></span>. These are Non-executive Directors, the CEO, the Chief Financial Officer<span class=\"_ _2\"></span>, the Chief Operating Officer<span class=\"_ _2\"></span>, the President <span class=\"_ _2\"></span>Australia and the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws6 gsdaa\">President Americas. </div><div class=\"t m0 h1f ff78 fs11 fc3 sc0 ls5 ws2 gsdab\">T<span class=\"_ _2\"></span>ransactions and outstanding loans/amounts with key management personnel<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsdac\">There were no purchases by key management personnel from the Group during FY2023 (2022: US$ nil; 2021: US$ nil). </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsdad\">There were no amounts payable by key management personnel at 30 June 2023 (2022: US$ nil; 2021: US$ nil).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsdae\">There were no loans receivable from or payable to key management personnel at 30 June 2023 (2022: US$ nil; 2021: US$ nil).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gsdaf\">T<span class=\"_ _2\"></span>ransactions with personally related entities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdb0\">A<span class=\"_ _2\"></span> number of Directors of the Group hold or have held positions in other companies (personally related entities) where it is considered they control or </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsdb1\">significantly influence the financial or operating policies of those entities. There were no reportable transactions with those entities and no amounts were </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsdb2\">owed by the Group to personally related entities at 30 June 2023 (2022: US$ nil; 2021: US$ nil).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdb3\">For more information on remuneration and transactions with key management personnel, refer to the Remuneration Report under Governance. </div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gsdb4\">26 <span class=\"_ _47\"> </span>Employee share ownership plans<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdb5\">Awards, in the form of the right to receive ordinary shares in BHP<span class=\"_ _2\"></span> Group Limited have been granted under the following employee share ownership plans: </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdb6\">Cash and Deferred Plan (CDP), Short-T<span class=\"_ _2a\"></span>erm Incentive Plan (STIP), Long-T<span class=\"_ _2a\"></span>erm Incentive Plan (L<span class=\"_ _2\"></span>TIP), Management <span class=\"_ _2\"></span>A<span class=\"_ _2\"></span>ward Plan (MAP), Commencement </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdb7\">awards and the all-employee share plan, Shareplus. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdb8\">Some awards are eligible to receive a cash payment, or the equivalent value in shares, equal to the dividend amount that would have been earned on the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdb9\">underlying shares awarded to those participants (the Dividend Equivalent Payment, or DEP). The DEP is provided to the participants once the underlying </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsdba\">shares are allocated or transferred to them. <span class=\"_ _2\"></span>Awards under the plans do not confer any rights to participate in a share issue; however<span class=\"_ _2\"></span>, there is discretion </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdbb\">under each of the plans to adjust the awards in response to a variation in the share capital of BHP Group Limited.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdbd\">The table below provides a description of each of the plans.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsdbe\">Plan<span class=\"_ _12a\"> </span>CDP and STIP<span class=\"_ _fa\"> </span>L<span class=\"_ _2a\"></span>TIP and MAP<span class=\"_ _117\"> </span>Commencement awards<span class=\"_ _d2\"> </span>Shareplus<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff75 fs5 fc3 sc0 ls5 ws2 gsdbf\">T<span class=\"_ _2\"></span>ype<span class=\"_ _24f\"> </span><span class=\"ff76\">Short-term incentive<span class=\"_ _123\"> </span>Long-term incentive<span class=\"_ _214\"> </span>Long-term incentive<span class=\"_ _37\"> </span>All-employee share </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdc0\">purchase plan<span class=\"_ _39c\"> </span></div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gsdc1\">Overview </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdc2\">The CDP was implemented </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdc3\">in FY2020 as a replacement </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdc4\">for the STIP<span class=\"_ _50\"></span>, both of which are </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdc5\">generally plans for Executive KMP </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdc6\">and members of the Executive </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdc7\">Leadership T<span class=\"_ _50\"></span>eam who are not </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdc8\">Executive KMP<span class=\"_ _50\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdc9\">Under the CDP<span class=\"_ _50\"></span>, two thirds of the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdca\">value of a participant\u2019s short-term </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdcb\">incentive amount is awarded </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdcc\">as rights to receive BHP Group </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdcd\">Limited shares at the end of the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdce\">vesting period (and the remaining </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdcf\">one third is delivered in cash). </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdd0\">T<span class=\"_ _2\"></span>wo awards of deferred shares are </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdd1\">granted, each of the equivalent </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdd2\">value to the cash award, vesting in </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsdd3\">two and five years respectively<span class=\"_ _2\"></span>. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdd4\">Under the STIP<span class=\"_ _50\"></span>, half of the value of </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdd5\">a participant\u2019s short-term incentive </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdd6\">amount was awarded as rights </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdd7\">to receive BHP Group Limited </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdd8\">shares at the end of the two-year </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdd9\">vesting period.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdda\">The L<span class=\"_ _2\"></span>TIP<span class=\"_ _2\"></span> is a plan for Executive KMP and </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsddb\">members of the Executive Leadership T<span class=\"_ _50\"></span>eam </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsddc\">who are not Executive KMP<span class=\"_ _50\"></span>, and awards are </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsddd\">granted annually<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdde\">The MAP is a plan for BHP<span class=\"_ _2\"></span> senior </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsddf\">management who are not Executive KMP<span class=\"_ _50\"></span>. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsde0\">The number of share rights awarded is </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsde1\">determined by a participant\u2019s role and grade.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsde2\">Awards may be granted </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsde3\">to new members of the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsde4\">Executive Leadership </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsde5\">T<span class=\"_ _2a\"></span>eam recruited into </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsde6\">the Group to replace </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsde7\">awards foregone from a </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsde8\">previous company<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsde9\">Employees may </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdea\">contribute up to </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdeb\">US$5,000 to acquire </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdec\">shares in any plan </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsded\">year<span class=\"_ _2\"></span>. On the third </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdee\">anniversary of </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdef\">the start of a plan </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdf0\">year<span class=\"_ _2\"></span>, the Group will </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdf1\">match the number of </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdf2\">acquired shares.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gsdf3\">V<span class=\"_ _2\"></span>esting </div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gsdf4\">conditions<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdf5\">CDP: Service conditions only for </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdf6\">the two-year award. V<span class=\"_ _2\"></span>esting of the </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsdf7\">five-year award is subject to service </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdf8\">conditions and also to holistic </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdf9\">review of performance at the end </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsdfa\">of the five-year vesting period, </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsdfb\">including a five-year view on Safety </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdfc\">and Sustainability (previously </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsdfd\">HSEC) performance, profitability<span class=\"_ _2\"></span>, </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsdfe\">cash flow<span class=\"_ _2\"></span>, balance sheet health, </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsdff\">returns to shareholders, corporate </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse00\">governance and conduct.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse01\">STIP: Service conditions only<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse02\">L<span class=\"_ _2\"></span>TIP: Service and performance conditions. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse03\">From FY2023 BHP\u2019s <span class=\"_ _2\"></span>T<span class=\"_ _2a\"></span>otal Shareholder </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse04\">Return<span class=\"_ _39c\"> </span></div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gse05\">1</div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse06\"> (TSR) performance relative to two </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse07\">Morgan Stanley Capital International (MSCI) </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse08\">market indices, the MSCI World Metals and </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse09\">Mining Index (\u201cSector Group TSR\u201d) and the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse0a\">MSCI World Index (\u201cW<span class=\"_ _2\"></span>orld TSR\u201d). The Sector </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse0b\">Group TSR over a five-year performance </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse0c\">period determines the vesting of 67 per cent </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse0d\">of the awards, while performance relative to </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse0e\">the World <span class=\"_ _2\"></span>TSR determines the vesting of 33 </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse0f\">per cent of the awards. For awards granted </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse10\">prior to FY2023, TSR performance relative </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse11\">to a bespoke sector peer group and the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse12\">MSCI World Index determines the vesting </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse13\">of 67 per cent and 33 per cent of the award, </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse14\">respectively<span class=\"_ _2\"></span>. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse15\">25 per cent of the award will vest where </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse16\">BHP\u2019s <span class=\"_ _2\"></span>TSR is equal to the median TSR </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse17\">of the relevant comparator group(s), as </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse18\">measured over the performance period. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse19\">Where TSR is below the median, awards </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse1a\">will not vest. V<span class=\"_ _2\"></span>esting occurs on a sliding </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse1b\">scale when BHP\u2019s <span class=\"_ _2\"></span>TSR measured over the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse1c\">performance period is between the median </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse1d\">TSR of the relevant comparator group(s) up </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse1e\">to a nominated level of TSR outperformance </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse1f\">over the relevant comparator group(s), as </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse20\">determined by the Committee, above which </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse21\">100 per cent of the award will vest.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse22\">MAP: Service conditions only<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse23\">Service and </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse24\">performance conditions.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse25\">The People and </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse26\">Remuneration </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse27\">Committee has absolute </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse28\">discretion to determine </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse29\">if the performance </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse2a\">condition has been </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse2b\">met and whether any<span class=\"_ _2\"></span>, </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse2c\">all or part of the award </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse2d\">will vest (or otherwise </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse2e\">lapse), having regard to </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse2f\">personal performance </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse30\">and the underlying </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse31\">financial performance </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse32\">of the Group during the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse33\">performance period. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse34\">T<span class=\"_ _2a\"></span>o the extent the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse35\">performance condition </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse36\">is not achieved, </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse37\">awards will lapse. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse38\">There is no retesting </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse39\">of the performance </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse3a\">condition. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse3b\">V<span class=\"_ _2\"></span>ested awards may be </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse3c\">subject to a holding lock.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse3d\">Service conditions only<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gse3e\">V<span class=\"_ _2\"></span>esting </div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gse3f\">period<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse40\">CDP \u2013 2 and 5 years<span class=\"ff76\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse41\">STIP \u2013 2 years<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse42\">L<span class=\"_ _2\"></span>TIP<span class=\"_ _2\"></span> \u2013 5 years<span class=\"ff76\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse43\">MAP \u2013 1 to 5 years<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse44\">2 years<span class=\"_ _12\"> </span>3 years<span class=\"_ _39c\"> </span></div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gse45\">Dividend </div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gse46\">Equivalent </div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gse47\">Payment<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse48\">CDP \u2013 <span class=\"_ _2\"></span>Y<span class=\"_ _2\"></span>es<span class=\"ff76\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse49\">STIP \u2013 <span class=\"_ _2\"></span>Y<span class=\"_ _2\"></span>es<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse4a\">L<span class=\"_ _2\"></span>TIP<span class=\"_ _2\"></span> \u2013 Y<span class=\"_ _2a\"></span>es<span class=\"ff76\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse4b\">MAP \u2013 V<span class=\"_ _2a\"></span>aries<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 lse6 ws12a gse4c\">Ye<span class=\"_ _43\"></span>s<span class=\"_ _7a\"> </span><span class=\"ls5 ws2\">No<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h7 ff78 fs5 fc3 sc0 ls5 ws2 gse4d\">Exercise </div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gse4e\">period<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse4f\">None <span class=\"_ _1c6\"> </span>None<span class=\"_ _2c0\"> </span>None<span class=\"_ _251\"> </span>None<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gse50\">1 <span class=\"_ _42\"> </span>For L<span class=\"_ _2\"></span>TIP awards granted prior to unification and where the five-year performance period ends after unification, the <span class=\"_ _2\"></span>TSR at the start of the performance period is based on the </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gse51\">weighted average of the TSRs of BHP Group Limited and BHP<span class=\"_ _2\"></span> Group Plc and the TSR at the end of the performance period is based on the TSR of BHP<span class=\"_ _2\"></span> Group Limited.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gse53\">Employee share awards </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse54\">2023<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse55\">Number of </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse56\">awards at the </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse57\">beginning of the <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff78 fs3 fc3 sc0 ls5 ws2 gse58\">financial year<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse59\">Number of <span class=\"_ _40\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse5a\">awards issued </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse5b\">during the year<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse5c\">Number of </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse5d\">awards vested </div><div class=\"t m0 h41 ff78 fs3 fc3 sc0 ls5 ws2 gse5e\">and exercised<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse5f\">Number of </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse60\">awards <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse61\">lapsed<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse62\">Number of </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse63\">awards at the <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse64\">end of the </div><div class=\"t m0 h41 ff78 fs3 fc3 sc0 ls5 ws2 gse65\">financial year<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse66\">Weighted <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse67\">average </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse68\">remaining </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse69\">contractual <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse6a\">life (years)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse6b\">Weighted </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse6c\">average share </div><div class=\"t m0 h41 ff78 fs3 fc3 sc0 ls5 ws2 gse6d\">price at exercise </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse6e\">date<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gse6f\">BHP Group Limited<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gse70\">CDP awards<span class=\"_ _2c\"> </span><span class=\"ff75\">707,994<span class=\"_ _64\"> </span>435,244<span class=\"_ _1ff\"> </span>155,158<span class=\"_ _9c\"> </span>19,499<span class=\"_ _1ff\"> </span>968,581<span class=\"_ _6a\"> </span>2.1<span class=\"_ _e6\"> </span>A$41.62<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gse71\">STIP awards<span class=\"_ _8a\"> </span><span class=\"ff75\">83,810<span class=\"_ _1eb\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _9c\"> </span></span>83,810<span class=\"_ _1eb\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _1eb\"> </span> \u2212<span class=\"_ _1eb\"> </span> \u2212<span class=\"_ _e6\"> </span></span>A$41.55<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gse72\">L<span class=\"_ _2\"></span>TIP<span class=\"_ _2\"></span> awards <span class=\"_ _28e\"> </span><span class=\"ff75\">3,143,477<span class=\"_ _1fd\"> </span>622,992<span class=\"_ _37\"> </span>1,175,882<span class=\"_ _9c\"> </span>31,791<span class=\"_ _6b\"> </span>2,558,796<span class=\"_ _6a\"> </span>2.2<span class=\"_ _e6\"> </span>A$41.59<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gse73\">MAP awards<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gse74\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gse75\">7,094,173<span class=\"_ _6b\"> </span>2,404,671<span class=\"_ _37\"> </span>2,353,273<span class=\"_ _1ff\"> </span>491,845<span class=\"_ _6b\"> </span>6,653,726<span class=\"_ _6a\"> </span>1.2<span class=\"_ _e6\"> </span>A$41.74<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gse76\">Commencement awards<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gse77\">86,279<span class=\"_ _1eb\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _9c\"> </span></span>69,025<span class=\"_ _9c\"> </span>17,254<span class=\"_ _1eb\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _1eb\"> </span> \u2212<span class=\"_ _e6\"> </span></span>A$41.55<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gse78\">Shareplus<span class=\"_ _1c3\"> </span><span class=\"ff75\">4,914,470<span class=\"_ _6b\"> </span>3,089,822<span class=\"_ _37\"> </span>2,330,077<span class=\"_ _1ff\"> </span>550,364<span class=\"_ _37\"> </span>5,123,851<span class=\"_ _6a\"> </span>1.3<span class=\"_ _e6\"> </span>A$44.88<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gse79\">1 <span class=\"_ _42\"> </span>There were no awards vested and exercisable at the end of the financial year<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gse7a\">Fair value and assumptions in the calculation of fair value for awards issued<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse7b\">2023<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws12b gse7c\">Weighted average </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse7d\">fair value of </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse7e\">awards granted </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse7f\">during the year </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse80\">US$<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse81\">Risk-free </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse82\">interest rate<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse83\">Estimated </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse84\">life of awards<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse85\">Share price at <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse86\">grant date<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse87\">Estimated </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse88\">volatility of </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gse89\">share price<span class=\"_ _15\"> </span>Dividend yield<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gse8a\">BHP Group Limited<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gse8b\">CDP awards<span class=\"_ _c0\"> </span><span class=\"ff75\">28.88<span class=\"_ _bb\"> </span><span class=\"ff78\">n/a<span class=\"_ _19e\"> </span></span>2 and 5 years<span class=\"_ _1eb\"> </span>A$43.48<span class=\"_ _14f\"> </span><span class=\"ff78\">n/a<span class=\"_ _39\"> </span>n/a<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gse8c\">L<span class=\"_ _2\"></span>TIP<span class=\"_ _2\"></span> awards<span class=\"_ _253\"> </span><span class=\"ff75\">20.22<span class=\"_ _b8\"> </span>3.33%<span class=\"_ _1fd\"> </span>5 years<span class=\"_ _181\"> </span>A$43.48<span class=\"_ _b8\"> </span>34.0%<span class=\"_ _39\"> </span><span class=\"ff78\">n/a<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gse8d\">MAP awards<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gse8e\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gse8f\">21.17<span class=\"_ _14f\"> </span><span class=\"ff78\">n/a<span class=\"_ _1a1\"> </span></span>1-3 years<span class=\"_ _2f\"> </span><span class=\"ff78\">A$37.96/A$46.97<span class=\"_ _14f\"> </span>n/a<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gse90\">7.5% up to 30 June 2024 and </div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gse91\">5.0% per annum thereafter<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gse92\">Shareplus <span class=\"_ _1c6\"> </span><span class=\"ff75\">18.94<span class=\"_ _b8\"> </span>2.35%<span class=\"_ _1fd\"> </span>3 years<span class=\"_ _181\"> </span>A$52.39<span class=\"_ _bb\"> </span><span class=\"ff78\">n/a<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gse93\">7.5% up to 30 June 2024 and </div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gse94\">5.0% per annum thereafter<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gse95\">1 <span class=\"_ _42\"> </span>Includes MAP awards granted on 21 September 2022 and 3 <span class=\"_ _2\"></span>April 2023.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gse96\">Recognition and measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse97\">The fair value at grant date of equity-settled share awards is charged to the income statement over the period for which the benefits of employee services </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse98\">are expected to be derived. The fair values of awards granted were estimated using a Monte Carlo simulation methodology and Black-Scholes option </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse99\">pricing technique and consider the following factors: </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse9a\">\u2013  <span class=\"ff76\">exercise price<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse9b\">\u2013  <span class=\"ff76\">expected life of the award<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse9c\">\u2013  <span class=\"ff76\">current market price of the underlying shares<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse9d\">\u2013  <span class=\"ff76\">expected volatility using an analysis of historic volatility over different rolling periods. For the L<span class=\"_ _2\"></span>TIP<span class=\"_ _50\"></span>, it is calculated for all sector comparators and the </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gse9e\">published MSCI World Index<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gse9f\">\u2013  <span class=\"ff76\">expected dividends<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsea0\">\u2013  <span class=\"ff76\">risk-free interest rate, which is an applicable government bond rate<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsea1\">\u2013  <span class=\"ff76\">market-based performance hurdles<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsea2\">\u2013  <span class=\"ff76\">non-vesting conditions<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsea3\">Where awards are forfeited because non-market-based vesting conditions are not satisfied, the expense previously recognised is </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsea4\">proportionately reversed. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsea5\">The tax effect of awards granted is recognised in income tax expense, except to the extent that the total tax deductions are expected to exceed the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsea6\">cumulative remuneration expense. In this situation, the excess of the associated current or deferred tax is recognised in equity and forms part of the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsea7\">employee share awards reserve. The fair value of awards as presented in the tables above represents the fair value at grant date. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsea8\">In respect of employee share awards, the Group utilises the BHP Group Limited Employee Equity T<span class=\"_ _2\"></span>rust. <span class=\"_ _2\"></span>The trustee of this trust is an independent </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsea9\">company<span class=\"_ _2\"></span>, resident in Jersey<span class=\"_ _2a\"></span>. The trust uses funds provided by the Group to acquire ordinary shares to enable awards to be made or satisfied. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gseaa\">The ordinary shares may be acquired by purchase in the market or by subscription at not less than nominal value. </div><div class=\"t m0 hb ff78 fs7 fc7 sc0 ls5 ws2 gseac\">27 <span class=\"_ _47\"> </span>Employee benefits, restructuring and post-retirement employee benefits provisions<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsead\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gseae\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gseaf\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gseb0\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gseb1\">Employee benefits<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gseb2\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gseb3\">1,749<span class=\"_ _64\"> </span><span class=\"ff76\">1,351<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gseb4\">Restructuring<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gseb5\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gseb6\">28<span class=\"_ _a\"> </span><span class=\"ff76\">27<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gseb7\">Post-retirement employee benefits</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gseb8\">3<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gseb9\">373<span class=\"_ _25\"> </span><span class=\"ff76\">281<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gseba\">T<span class=\"_ _2\"></span>otal provisions <span class=\"_ _321\"> </span>2,150<span class=\"_ _64\"> </span><span class=\"ff76\">1,659<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsebb\">Comprising:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsebc\">Current<span class=\"_ _1c7\"> </span><span class=\"ff75\">1,734<span class=\"_ _64\"> </span></span>1,319<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsebd\">Non-current<span class=\"_ _2b9\"> </span><span class=\"ff75\">416<span class=\"_ _25\"> </span></span>340<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsebe\">2023<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsebf\">Employee </div><div class=\"t m0 h41 ff78 fs3 fc3 sc0 ls5 ws2 gsec0\">benefits <span class=\"_ _2\"></span><span class=\"ff75\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsec1\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsec2\">Restructuring </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsec3\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsec4\">Post-retirement </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsec5\">employee </div><div class=\"t m0 h41 ff78 fs3 fc3 sc0 ls5 ws2 gsec6\">benefits</div><div class=\"t m0 h137 ff75 fsfe fc3 sc0 ls5 ws2 gsec7\">3<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsec8\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsec9\">T<span class=\"_ _2\"></span>otal <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gseca\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsecb\">At the beginning of the financial year<span class=\"_ _145\"> </span><span class=\"ff75\">1,351<span class=\"_ _6d\"> </span>27<span class=\"_ _25\"> </span>281<span class=\"_ _64\"> </span>1,659<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsecc\">Acquisition of subsidiaries and operations</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsecd\">4<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsece\">25<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _6d\"> </span></span>25<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsecf\">Charge/(credit) for the year:<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsed0\">Underlying<span class=\"_ _2a8\"> </span><span class=\"ff75\">1,675<span class=\"_ _6d\"> </span>26<span class=\"_ _a\"> </span>75<span class=\"_ _64\"> </span>1,776<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsed1\">Discounting<span class=\"_ _322\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _6d\"> </span><span class=\"ff75\">19<span class=\"_ _a\"> </span>19<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsed2\">Net interest expense<span class=\"_ _2c3\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span><span class=\"ff75\">(5)<span class=\"_ _b0\"> </span>(5)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsed3\">Exchange variations<span class=\"_ _2fe\"> </span><span class=\"ff75\">(21)<span class=\"_ _b0\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _a\"> </span></span>34<span class=\"_ _6d\"> </span>13<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsed4\">Released during the year<span class=\"_ _187\"> </span><span class=\"ff75\">(66)<span class=\"_ _b0\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span></span>(2)<span class=\"_ _10d\"> </span>(68)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsed5\">Remeasurement gains taken to retained earnings<span class=\"_ _186\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _6d\"> </span><span class=\"ff75\">18<span class=\"_ _a\"> </span>18<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsed6\">Utilisation<span class=\"_ _323\"> </span><span class=\"ff75\">(1,204)<span class=\"_ _b5\"> </span>(25)<span class=\"_ _10d\"> </span>(47)<span class=\"_ _13\"> </span>(1,276)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsed7\">T<span class=\"_ _2\"></span>ransfers and other movements<span class=\"_ _324\"> </span><span class=\"ff75\">(1<span class=\"_ _2\"></span>1)<span class=\"_ _b0\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _61\"> </span></span>(11)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff78 fs2 fc3 sc0 ls5 ws2 gsed8\">At the end of the financial year<span class=\"_ _24c\"> </span><span class=\"ff75\">1,749<span class=\"_ _6d\"> </span>28<span class=\"_ _25\"> </span>373<span class=\"_ _140\"> </span>2,150<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsed9\">1 <span class=\"_ _42\"> </span>The expenditure associated with total employee benefits will occur in a pattern consistent with when employees choose to exercise their entitlement to benefits.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gseda\">2 <span class=\"_ _42\"> </span>T<span class=\"_ _2a\"></span>otal restructuring provisions include provisions for terminations and office closures.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsedb\">3 <span class=\"_ _42\"> </span>The net liability recognised in the Consolidated Balance Sheet includes US$151 million present value of funded defined benefits pension obligation (2022: US$165 million) </div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsedc\">offset by fair value of defined benefit scheme assets US$(159) million (2022: US$(169) million), US$79 million present value of unfunded defined pension and post-retirement </div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsedd\">medical benefits obligation (2022: US$85 million) and US$302 million unfunded post-employment benefits obligation in Chile (2022: US$200 million). </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsede\">4 <span class=\"_ _42\"> </span>Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019<span class=\"_ _2\"></span> for more information.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gsee0\">Recognition and measurement<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsee1\">Provisions are recognised by the Group when:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsee2\">\u2013  <span class=\"ff76\">there is a present legal or constructive obligation as a result of past events<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsee3\">\u2013  it is more likely than not that a permanent outflow of resources will be required to settle the obligation<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsee4\">\u2013  the amount can be reliably estimated and measured at the present value of management\u2019s best estimate of the cash outflow required to settle the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsee5\">obligation at the reporting date<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsee6\">Provision<span class=\"_ _6f\"> </span>Description<span class=\"_ _39c\"> </span></div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gsee7\">Employee </div><div class=\"t m0 h7 ff78 fs5 fc3 sc0 ls5 ws2 gsee8\">benefits<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsee9\">Liabilities for benefits accruing to employees up until the reporting date in respect of wages and salaries, annual leave and any </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gseea\">accumulating sick leave are recognised in the period the related service is rendered. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gseeb\">Liabilities recognised in respect of short-term employee benefits expected to be settled within 12 months are measured at the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gseec\">amounts expected to be paid when the liabilities are settled.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gseed\">Liabilities for other long-term employee benefits, including long service leave, are measured as the present value of estimated future </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gseee\">payments for the services provided by employees up to the reporting date.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gseef\">Liabilities that are not expected to be settled within 12 months are discounted at the reporting date using market yields of high-quality </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsef0\">corporate bonds or government bonds for countries where there is no deep market for corporate bonds. The rates used reflect the </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsef1\">terms to maturity and currency that match, as closely as possible, the estimated future cash outflows.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsef2\">In relation to industry-based long service leave funds, the Group\u2019s liability<span class=\"_ _2a\"></span>, including obligations for funding shortfalls, is determined </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsef3\">after deducting the fair value of dedicated assets of such funds.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsef4\">Liabilities for short and long-term employee benefits (other than unpaid wages and salaries) are disclosed within employee benefits.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsef5\">Other liabilities for unpaid wages and salaries related to the current period are recognised in other creditors.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gsef6\">Review of employee allowances and entitlements<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls6 ws5 gsef7\">On 1 <span class=\"_ _2\"></span>June 2023, the <span class=\"_ _2\"></span>Group disclosed <span class=\"_ _2\"></span>the identification of <span class=\"_ _2\"></span>two issues with <span class=\"_ _2\"></span>certain allowances <span class=\"_ _2\"></span>and entitlements af<span class=\"_ _2\"></span>fecting a number <span class=\"_ _2\"></span>of </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls6 ws5 gsef8\">current and <span class=\"_ _2\"></span>former employees in <span class=\"_ _2a\"></span>Australia. The <span class=\"_ _2\"></span>identified issues <span class=\"_ _2\"></span>relate to rostered <span class=\"_ _2\"></span>employees having leave <span class=\"_ _2\"></span>incorrectly deducted <span class=\"_ _2\"></span>on public </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls6 ws2 gsef9\">holidays since 2010 (Leave issue) and certain employees at Port Hedland being entitled to additional allowances due to an error with the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls6 ws2 gsefa\">employment entity in their contract (Port Hedland issue). The Group self-reported the issues to the Fair W<span class=\"_ _2\"></span>ork Ombudsman in <span class=\"_ _2\"></span>Australia. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsefb\">The Group has applied extensive resources to the review and analysis of its records, with a dedicated team established to investigate </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsefc\">and remediate the issues. Since the date of the announcement, the Group has progressed its analysis and has commenced </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsefd\">contacting impacted employees. The Group has commenced paying additional allowances to those current employees impacted </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsefe\">by the Port Hedland issue. The Group has also corrected the leave balances of current employees impacted by the Leave Issue. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gseff\">The Group\u2019s current best estimate of the cost of remediating the two issues, recognised in employee benefit provisions at 30 June </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf00\">2023, is US$265 million, incorporating on-costs including associated superannuation and interest payments. The calculation of this </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf01\">provision involved a substantial volume of data and a significant degree of complexity with further detailed modelling and validation </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf02\">required to determine the final cost of remediation. <span class=\"_ _2\"></span>As such, uncertainty remains in the amount and timing of final remediation costs, </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf03\">with the outcomes also subject to continuing engagement with regulatory authorities, including the Fair Work Ombudsman.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf04\">A<span class=\"_ _2\"></span> further US$15 million of other related costs were recognised in the year ended 30 June 2023, which do not form part of the </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf05\">employee benefit provision. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf06\">As the Group has applied judgement in determining the provision for 30 June 2023, there is a risk that the provision may be adjusted </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf07\">in future reporting periods as the remediation process continues. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf08\">The Group has also engaged a global assurance firm to conduct a thorough review of the Group\u2019s payroll systems. <span class=\"_ _2\"></span>As this review is </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf09\">ongoing there is a risk that other instances of non-compliance requiring remediation may be identified and, as such, that associated </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf0a\">provisions may be recognised in future reporting periods. </div><div class=\"t m0 h8 ff75 fs5 fc3 sc0 ls5 ws2 gsf0b\">Restructuring<span class=\"_ _f2\"> </span><span class=\"ff76\">Restructuring provisions are recognised when: </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf0c\">\u2013  <span class=\"ff76\">the Group has developed a detailed formal plan identifying the business or part of the business concerned, the location and </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf0d\">approximate number of employees affected, a detailed estimate of the associated costs, and an appropriate timeline<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf0e\">\u2013  <span class=\"ff76\">the restructuring has either commenced or been publicly announced and can no longer be withdrawn<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf0f\">Payments that are not expected to be settled within 12 months of the reporting date are measured at the present value of the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf10\">estimated future cash payments expected to be made by the Group. </div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gsf11\">Post-retirement </div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gsf12\">employee </div><div class=\"t m0 h7 ff78 fs5 fc3 sc0 ls5 ws2 gsf13\">benefits </div><div class=\"t m0 h7 ff78 fs5 fc3 sc0 ls5 ws2 gsf14\">Defined contribution pension schemes and multi-employer pension schemes<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf15\">For defined contribution schemes or schemes operated on an industry-wide basis where it is not possible to identify assets </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf16\">attributable to the participation by the Group\u2019s employees, the pension charge is calculated on the basis of contributions payable. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf17\">The Group contributed US$358 million during the financial year (2022: US$324 million; 2021: US$301 million) to defined contribution </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf18\">plans and multi-employer defined contribution plans. These contributions are expensed as incurred.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h7 ff78 fs5 fc3 sc0 ls5 ws2 gsf19\">Defined benefit pension and post-retirement medical schemes<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf1a\">The Group operates or participates in a number of defined benefit pension schemes throughout the world, all of which are closed to </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf1b\">new entrants. The funding of the schemes complies with local regulations. The assets of the schemes are generally held separately </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf1c\">from those of the Group and are administered by trustees or management boards. The Group also operates a number of unfunded </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf1d\">post-retirement medical schemes in the United States, Canada and Europe. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf1e\">For defined benefit schemes, an asset or liability is recognised in the balance sheet based at the present value of defined benefit </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf1f\">obligations less, where funded, the fair value of plan assets, except that any such asset cannot exceed the present value of </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf20\">expected refunds from and reductions in future contributions to the plan. Full actuarial valuations are prepared by local actuaries </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf21\">for all schemes, using discount rates based on market yields at the reporting date on high-quality corporate bonds or by reference </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf22\">to national government bonds if high-quality corporate bonds are not available. Where funded, scheme assets are invested in a </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf23\">diversified range of asset classes, predominantly comprising bonds and equities. </div><div class=\"t m0 h11 ff75 fsa fc3 sc0 ls5 ws2 gsf25\">Group and related party information<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gsf26\">28 <span class=\"_ _47\"> </span>Discontinued operations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf27\">On 1 June 2022 (Completion date) BHP completed the merger of the Group\u2019<span class=\"_ _2\"></span>s oil and gas portfolio with Woodside Energy Group Limited (\u2018Woodside\u2019). </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf28\">Woodside acquired the entire share capital of BHP<span class=\"_ _2\"></span> Petroleum International Pty Ltd (\u2018BHP Petroleum\u2019) in exchange for 914,768,948 newly issued </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf29\">Woodside ordinary shares. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf2a\">On the Completion Date, the Group paid a fully franked in specie dividend in the form of Woodside shares to eligible BHP shareholders. Eligible BHP<span class=\"_ _2\"></span> </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf2b\">shareholders received one Woodside share for every 5.5340 BHP shares they held on the Group\u2019<span class=\"_ _2\"></span>s register at the record date of 26 May 2022. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf2c\">As part of completion and in order to reflect the economic effective date of 1 July 2021, the Group made a net cash payment of US$0.7 billion (net of </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf2d\">completion adjustments) to Woodside in addition to US$0.4 billion in cash that was left in the BHP Petroleum bank accounts to fund ongoing operations. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf2e\">The total cash transfer of US$1.1 billion reflected the net cash flows generated by BHP Petroleum between 1 July 2021 and Completion Date adjusted for </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf2f\">dividends Woodside would have paid on the newly issued Woodside ordinary shares, had the Merger completed on 1 July 2021. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf30\">There was no contribution of Discontinued operations to the Group\u2019s profit and cash flows for the year ended 30 June 2023. The contribution of </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf31\">Discontinued operations for the years ended 30 June 2022 and 30 June 2021 is detailed below:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gsf32\">Income statement \u2013 Discontinued operations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf33\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf34\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf35\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf36\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsf37\">Profit/(loss) after taxation from operating activities<span class=\"_ _238\"> </span><span class=\"ff76\">2,496<span class=\"_ _9c\"> </span>(225)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsf38\">Net gain on Petroleum merger with Woodside (after tax) <span class=\"_ _247\"> </span>8,159<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsf39\">Profit/(loss) after taxation<span class=\"_ _127\"> </span><span class=\"ff76\">10,655<span class=\"_ _9c\"> </span>(225)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsf3a\">Attributable to non-controlling interests<span class=\"_ _269\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf3b\">Attributable to BHP shareholders<span class=\"_ _325\"> </span>10,655<span class=\"_ _9c\"> </span>(225)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf3c\">Basic earnings/(loss) per ordinary share (cents)<span class=\"_ _18a\"> </span>210.5<span class=\"_ _25\"> </span>(4.5)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf3d\">Diluted earnings/(loss) per ordinary share (cents)<span class=\"_ _131\"> </span>210.1<span class=\"_ _25\"> </span>(4.5)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf3e\">The total comprehensive income attributable to BHP shareholders from Discontinued operations was a gain of US$10,596 million for the year ended </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf3f\">30 June 2022 (2021: US$231 million loss).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf40\">The conversion of options and share rights would decrease the loss per share for the year ended 30 June 2021, therefore its impact has been excluded </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf41\">from the diluted earnings per share calculation.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff78 fs11 fc3 sc0 ls5 ws2 gsf42\">Cash flows from Discontinued operations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf43\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf44\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf45\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf46\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsf47\">Net operating cash flows<span class=\"_ _326\"> </span><span class=\"ff76\">2,889<span class=\"_ _64\"> </span>1,351<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsf48\">Net investing cash flows</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsf49\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf4a\">(904)<span class=\"_ _13\"> </span>(1,520)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsf4b\">Net financing cash flows</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsf4c\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf4d\">(33)<span class=\"_ _b5\"> </span>(38)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf4e\">Net increase/(decrease) in cash and cash equivalents from Discontinued operations<span class=\"_ _327\"> </span>1,952<span class=\"_ _9c\"> </span>(207)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsf4f\">Net cash completion payment on merger of Petroleum with Woodside <span class=\"_ _c1\"> </span>(683)<span class=\"_ _b0\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsf50\">Cash and cash equivalents disposed<span class=\"_ _23b\"> </span>(399)<span class=\"_ _b0\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf51\">T<span class=\"_ _2a\"></span>otal cash impact<span class=\"_ _328\"> </span>870<span class=\"_ _9c\"> </span>(207)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf52\">1 <span class=\"_ _42\"> </span>Includes purchases of property<span class=\"_ _2\"></span>, plant and equipment and capitalised exploration related to drilling and development expenditure of US$1,144 million for FY2022 </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf53\">(2021:US$1,020 million), proceeds from sale of subsidiaries, operations and joint operations, net of cash of US$91 million for FY2022 (2021: investment of US$480 million), </div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsf54\">proceeds from sale of assets of US$151 million for FY2022 (2021: US$39 million) and other investing outflows of US$2 million for FY2022 (2021: outflow of US$59 million). </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf55\">2 <span class=\"_ _42\"> </span>Represents net repayment of interest bearing liabilities of US$33 million for FY2022 (2021: US$38 million). </div><div class=\"t m0 h1f ff78 fs11 fc3 sc0 ls5 ws2 gsf56\">Exceptional items \u2013 Discontinued operations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf57\">Exceptional items are those gains or losses where their nature, including the expected frequency of the events giving rise to them, and impact is </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf58\">considered material to the Financial Statements. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf59\">There were no exceptional items related to Discontinued operations for the year ended 30 June 2023.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf5a\">Exceptional items related to Discontinued operations included within the Group\u2019s profits for the years ended 30 June 2022 and 30 June 2021 are </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf5b\">detailed below<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf5c\">Y<span class=\"_ _2a\"></span>ear ended 30 June 2022<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf5d\">Gross <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf5e\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf5f\">T<span class=\"_ _2a\"></span>ax <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf60\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf61\">Net <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf62\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff78 fs2 fc3 sc0 ls5 ws2 gsf63\">Exceptional items by category<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf64\">Net gain on Petroleum merger with Woodside</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsf65\">1</div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf66\"> <span class=\"_ _141\"> </span>8,167<span class=\"_ _55\"> </span>(8)<span class=\"_ _250\"> </span>8,159<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf67\">T<span class=\"_ _2a\"></span>otal<span class=\"_ _329\"> </span>8,167<span class=\"_ _55\"> </span>(8)<span class=\"_ _b8\"> </span>8,159<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsf68\">Attributable to non-controlling interests<span class=\"_ _160\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf69\">Attributable to BHP shareholders<span class=\"_ _176\"> </span>8,167<span class=\"_ _55\"> </span>(8)<span class=\"_ _250\"> </span>8,159<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsf6a\">1 <span class=\"_ _42\"> </span>The tax expense associated with the exceptional item reflects the tax impact of transaction costs and other restructuring related activities undertaken pre-merger<span class=\"_ _2\"></span>. There were </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf6b\">no further tax impacts arising on the net gain on merger of our Petroleum business with Woodside as generated tax losses were either offset with capital gains in other </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf6c\">entities in the Group, or not recognised on the basis that it is not probable that future capital gains will be available against which the Group can utilise the tax losses. </div><div class=\"t m0 h8 ff76 fs5 fc2 sc0 ls5 ws2 gsf6e\">Net gain on disposal of Discontinued operations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf6f\">Details of the net gain on Petroleum merger with Woodside is presented below: </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf70\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf71\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf72\">Net assets disposed<span class=\"_ _32a\"> </span>10,172<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf73\">Fair value of Woodside shares<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsf74\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf75\">19,566<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf76\">Net cash completion payment on merger of Petroleum with Woodside</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsf77\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf78\">(683)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf79\">Foreign currency translation reserve transferred to the income statement<span class=\"_ _32b\"> </span>54<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf7a\">Other provisions and related indemnities recognised at completion<span class=\"_ _2b4\"> </span>(353)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf7b\">T<span class=\"_ _2\"></span>ransaction and other directly attributable costs<span class=\"_ _12d\"> </span>(245)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf7c\">Income tax expense<span class=\"_ _27e\"> </span>(8)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf7d\">Net gain on Petroleum merger with Woodside<span class=\"_ _32c\"> </span>8,159<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf7e\">1 <span class=\"_ _42\"> </span>Represents the consideration received being the fair value of 914,768,948 Woodside ordinary shares received using the closing <span class=\"_ _2\"></span>ASX share price of <span class=\"_ _2\"></span>A$29.76 on 31 May 2022 </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf7f\">(US$21.39 equivalent based on an exchange rate of <span class=\"_ _2\"></span>AUD/USD 0.7187).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsf80\">2 <span class=\"_ _42\"> </span>Reflects the net cash flows generated by BHP Petroleum between 1 July 2021 and Completion Date adjusted for dividends Woodside would have paid on the newly issued </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf81\">Woodside ordinary shares, had the Merger completed on 1 July 2021.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf82\">Y<span class=\"_ _2a\"></span>ear ended 30 June 2021<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf83\">Gross <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf84\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf85\">T<span class=\"_ _2a\"></span>ax <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf86\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf87\">Net <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf88\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff78 fs2 fc3 sc0 ls5 ws2 gsf89\">Exceptional items by category<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf8a\">Impairment of Potash assets</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsf8b\">1</div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsf8c\"> \u2212<span class=\"_ _9c\"> </span><span class=\"ff76\">(278)<span class=\"_ _95\"> </span>(278)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf8d\">COVID-19 related costs<span class=\"_ _32d\"> </span>(47)<span class=\"_ _c5\"> </span>8<span class=\"_ _14f\"> </span>(39)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf8e\">T<span class=\"_ _2a\"></span>otal<span class=\"_ _18b\"> </span>(47)<span class=\"_ _e\"> </span>(270)<span class=\"_ _e\"> </span>(317)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsf8f\">Attributable to non-controlling interests <span class=\"_ _32e\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsf90\">Attributable to BHP shareholders<span class=\"_ _2db\"> </span>(47)<span class=\"_ _e\"> </span>(270)<span class=\"_ _e\"> </span>(317)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gsf91\">1 <span class=\"_ _42\"> </span>The exceptional item reflects the impairment of tax losses originally expected to be recoverable against taxable profits from the Group\u2019s Potash assets. The impairment is </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsf92\">included in Discontinued operations as the entity with the losses transferred to Woodside and therefore the losses are no longer available to the Group. </div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gsf93\">29 Business combinations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gsf94\">OZ Minerals Limited </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf95\">On 2 May 2023 (Acquisition Date), the Group acquired 100 per cent of the issued share capital of OZ Minerals Limited (OZL) for a net cash consideration </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf96\">of US$5.9 billion. The terms of the acquisition did not include any contingent consideration. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf97\">OZL<span class=\"_ _2\"></span> is a mining and exploration company with a portfolio of operating, development and exploration stage projects both in <span class=\"_ _2\"></span>Australia and internationally<span class=\"_ _2\"></span>. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf98\">OZL<span class=\"_ _2\"></span>\u2019s primary activities consist of Prominent Hill and Carrapateena copper-gold mines in South <span class=\"_ _2\"></span>Australia, W<span class=\"_ _2\"></span>est Musgrave copper-nickel development </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf99\">project in Western <span class=\"_ _2\"></span>Australia and Caraj\u00e1s East copper-gold hub in Brazil. <span class=\"_ _2\"></span>This acquisition provides the Group with further exposure to copper<span class=\"_ _2\"></span>, nickel </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf9a\">and uranium.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf9b\">Acquisition related costs of US$107 million and integration costs of US$24 million have been expensed and included in other operating expenses in the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsf9c\">income statement.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsf9d\">The provisional fair values of the identifiable assets and liabilities acquired as of the date of acquisition were: </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsf9e\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsf9f\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsfa0\">Assets<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfa1\">Cash and cash equivalents<span class=\"_ _32f\"> </span><span class=\"ff75\">104<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfa2\">T<span class=\"_ _2\"></span>rade and other receivables</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsfa3\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsfa4\">77<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsfa5\">Other financial assets<span class=\"_ _1cd\"> </span><span class=\"ff75\">7<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfa6\">Inventories<span class=\"_ _272\"> </span><span class=\"ff75\">329<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfa7\">Property<span class=\"_ _2\"></span>, plant and equipment<span class=\"_ _330\"> </span><span class=\"ff75\">7,676<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gsfa8\">Intangible assets \u2013 goodwill<span class=\"_ _1c7\"> </span><span class=\"ff75\">192<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfa9\">Current tax receivable<span class=\"_ _310\"> </span><span class=\"ff75\">36<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfaa\">Other assets<span class=\"_ _331\"> </span><span class=\"ff75\">25<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsfab\">T<span class=\"_ _2\"></span>otal assets<span class=\"_ _332\"> </span>8,446<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsfac\">Liabilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfad\">T<span class=\"_ _2\"></span>rade and other payables<span class=\"_ _2f5\"> </span><span class=\"ff75\">242<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfae\">Interest bearing liabilities<span class=\"_ _333\"> </span><span class=\"ff75 ls49 ws4e\">1<span class=\"_ _0\"></span>,<span class=\"_ _0\"></span>111<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfaf\">Deferred tax liabilities</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsfb0\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsfb1\">867<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfb2\">Provisions<span class=\"_ _334\"> </span><span class=\"ff75\">254<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsfb3\">T<span class=\"_ _2\"></span>otal liabilities<span class=\"_ _335\"> </span>2,474<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff78 fs2 fc3 sc0 ls5 ws2 gsfb4\">Identifiable net assets acquired<span class=\"_ _336\"> </span><span class=\"ff75\">5,972<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfb5\">T<span class=\"_ _2a\"></span>otal consideration paid<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsfb6\">3,4<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsfb7\">5,972<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfb8\">Cash and cash equivalents acquired<span class=\"_ _337\"> </span><span class=\"ff75\">(104)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsfb9\">Net cash consideration paid<span class=\"_ _330\"> </span>5,868<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsfba\">1 <span class=\"_ _42\"> </span>This represents the gross contractual amount for trade and other receivables all of which is expected to be collected.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsfbb\">2 <span class=\"_ _42\"> </span>This primarily represents the difference between the provisional fair value of the mineral rights acquired and the corresponding tax base.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsfbc\">3 <span class=\"_ _42\"> </span>The Group executed a forward exchange contract to hedge the foreign exchange exposure on the consideration made in <span class=\"_ _2\"></span>AUD. On maturity of the hedging instrument, a </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsfbd\">hedge loss of US$35 million was capitalised to the cost of the acquisition.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsfbe\">4 <span class=\"_ _42\"> </span>The consideration paid by the Group was <span class=\"_ _2\"></span>A$26.50 (at the average hedged exchange rate of <span class=\"_ _2\"></span>AUD/USD 0.6681) per OZL share over 337,314,920 shares and excluded a </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsfbf\">special dividend of <span class=\"_ _2\"></span>A$1.75 per OZL share which was paid by OZL<span class=\"_ _2\"></span> to its shareholders immediately prior to acquisition.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsfc1\">The fair values disclosed are provisional as at 30 June 2023. Due to the size, complexity and timing of the acquisition, the valuation process is ongoing </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsfc2\">and will be completed within 12 months of the acquisition.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsfc3\">Goodwill of US$192 million has been provisionally recognised, representing the excess of consideration paid above the provisional fair value of the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsfc4\">acquired assets and liabilities. The goodwill primarily arises from the deferred tax liability recognised at acquisition due to a difference between the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsfc5\">provisional fair value of mineral rights acquired and the corresponding tax base. The goodwill represents the provisional amount, which could not be </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsfc6\">reliably allocated to a CGU or group of CGUs at 30 June 2023. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsfc7\">None of the goodwill recognised is expected to be deductible for tax purposes. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsfc8\">OZL<span class=\"_ _2\"></span> contributed revenue of US$315 million and profit after taxation of US$17 million to the Group from acquisition date to 30 June 2023. The estimated </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsfc9\">OZL<span class=\"_ _2\"></span> contribution to revenue and profit after taxation of the combined Group for the year ended 30 June 2023, had the acquisition occurred on 1 July </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsfca\">2022, would have been US$1,410 million and US$1<span class=\"_ _2\"></span>14 million, respectively<span class=\"_ _2a\"></span>. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsfcb\">There were no business combinations entered into by the Group in the previous financial year<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gsfcc\">Key judgements and estimates<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff75 fs5 fc3 sc0 ls5 ws2 gsfcd\">Judgements:<span class=\"ff76\"> Judgement is required to determine the fair value of assets acquired and liabilities assumed at acquisition date in a business </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsfce\">combination, which could have a material impact on goodwill. </div><div class=\"t m0 h9 ff75 fs5 fc3 sc0 ls5 ws2 gsfcf\">Estimates:<span class=\"ff77\"> The Group used the discounted cash-flow method to measure the fair value of mineral rights. Key assumptions used included commodity </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsfd0\">prices, production volumes, life of mine, cash outflows (including operating costs, capital expenditure, closure and rehabilitation costs and taxes), </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsfd1\">discount rates and risking factors.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws121 gsfd2\">30 Subsidiaries<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gsfd3\">Significant subsidiaries of the Group are those with the most significant contribution to the Group\u2019s net profit or net assets. <span class=\"_ _2\"></span>The Group\u2019s interest in the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsfd4\">subsidiaries\u2019<span class=\"_ _2\"></span> results are listed in the table below<span class=\"_ _2\"></span>. </div><div class=\"t m0 h41 ff78 fs3 fc3 sc0 ls5 ws2 gsfd5\">Significant subsidiaries </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsfd6\">Country of </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsfd7\">incorporation<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsfd8\">Principal activity<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsfd9\">Group\u2019s interest<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsfda\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gsfdb\">%<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsfdc\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gsfdd\">%<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsfde\">Coal<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfdf\">Hunter V<span class=\"_ _2\"></span>alley Energy Coal Pty Ltd<span class=\"_ _201\"> </span>Australia<span class=\"_ _168\"> </span>Coal mining<span class=\"_ _338\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsfe0\">Copper<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfe1\">BHP Olympic Dam Corporation Pty Ltd<span class=\"_ _339\"> </span>Australia<span class=\"_ _168\"> </span>Copper and uranium mining<span class=\"_ _33a\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfe2\">Compa\u00f1ia Minera Cerro Colorado Limitada<span class=\"_ _203\"> </span>Chile<span class=\"_ _ec\"> </span>Copper mining<span class=\"_ _2e9\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfe3\">Minera Escondida Ltda</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsfe4\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfe5\">Chile<span class=\"_ _200\"> </span>Copper mining<span class=\"_ _33b\"> </span><span class=\"ff75\">57.5<span class=\"_ _51\"> </span></span>57.5<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfe6\">Minera Spence SA<span class=\"_ _1ad\"> </span>Chile<span class=\"_ _200\"> </span>Copper mining<span class=\"_ _33c\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfe7\">OZ Minerals Carrapateena Pty Ltd</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsfe8\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsfe9\">Australia<span class=\"_ _168\"> </span>Copper<span class=\"_ _2\"></span>, gold and silver mining<span class=\"_ _85\"> </span><span class=\"ff75\">100<span class=\"_ _206\"> </span><span class=\"ff77\">\u2013<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfea\">OZ Minerals Prominent Hill Operations Pty Ltd</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsfeb\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsfec\">Australia<span class=\"_ _168\"> </span>Copper<span class=\"_ _2\"></span>, gold and silver mining<span class=\"_ _85\"> </span><span class=\"ff75\">100<span class=\"_ _206\"> </span><span class=\"ff77\">\u2013 </span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsfed\">Iron Ore<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsfee\">BHP Iron Ore (Jimblebar) Pty Ltd</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsfef\">3<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsff0\">Australia<span class=\"_ _168\"> </span>Iron ore mining<span class=\"_ _1ea\"> </span><span class=\"ff75\">85<span class=\"_ _d0\"> </span></span>85 </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsff1\">BHP Iron Ore Pty Ltd<span class=\"_ _c0\"> </span>Australia<span class=\"_ _e\"> </span>Service company<span class=\"_ _1d8\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsff2\">BHP (T<span class=\"_ _50\"></span>owage Service) Pty Ltd<span class=\"_ _110\"> </span>Australia<span class=\"_ _168\"> </span>T<span class=\"_ _2a\"></span>owing services<span class=\"_ _2ca\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsff3\">Marketing<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsff4\">BHP Billiton Freight Singapore Pte Limited<span class=\"_ _b5\"> </span>Singapore<span class=\"_ _250\"> </span>Freight services<span class=\"_ _2ca\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsff5\">BHP Billiton Marketing <span class=\"_ _2\"></span>AG<span class=\"_ _290\"> </span>Switzerland<span class=\"_ _d0\"> </span>Marketing and trading<span class=\"_ _24d\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsff6\">BHP Billiton Marketing <span class=\"_ _2\"></span>Asia Pte Ltd<span class=\"_ _2e7\"> </span>Singapore<span class=\"_ _1a\"> </span>Marketing support and other services<span class=\"_ _78\"> </span><span class=\"ff75\">100<span class=\"_ _107\"> </span></span>100 </div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gsff7\">Group and Unallocated<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsff8\">BHP Billiton Finance B.V<span class=\"_ _2a\"></span>.<span class=\"_ _1ac\"> </span>The Netherlands<span class=\"_ _8c\"> </span>Finance<span class=\"_ _244\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsff9\">BHP Billiton Finance Limited<span class=\"_ _7\"> </span>Australia<span class=\"_ _168\"> </span>Finance<span class=\"_ _244\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsffa\">BHP Billiton Finance (USA) Limited <span class=\"_ _1f\"> </span>Australia<span class=\"_ _168\"> </span>Finance<span class=\"_ _244\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsffb\">BHP Canada Inc.<span class=\"_ _21d\"> </span>Canada<span class=\"_ _1b\"> </span>Potash development<span class=\"_ _2f1\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsffc\">BHP Group Operations Pty Ltd<span class=\"_ _18\"> </span>Australia<span class=\"_ _168\"> </span>Administrative services<span class=\"_ _198\"> </span><span class=\"ff75\">100<span class=\"_ _107\"> </span></span>100 </div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gsffd\">BHP Nickel W<span class=\"_ _2\"></span>est Pty Ltd<span class=\"_ _1c3\"> </span>Australia<span class=\"_ _168\"> </span><span class=\"ff77\">Nickel mining, smelting, refining and administrative services<span class=\"_ _c5\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span></span>100 </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gsffe\">OZ Minerals Musgrave Operations Pty Ltd<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gsfff\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs1000\">Australia<span class=\"_ _168\"> </span>Copper and nickel mining<span class=\"_ _23a\"> </span><span class=\"ff75\">100<span class=\"_ _1a\"> </span><span class=\"ff77\">\u2013 </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1001\">WMC Finance (USA) Limited<span class=\"_ _137\"> </span>Australia<span class=\"_ _168\"> </span>Finance<span class=\"_ _244\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1002\">1 <span class=\"_ _42\"> </span>As the Group has the ability to direct the relevant activities at Minera Escondida Ltda, it has control over the entity<span class=\"_ _2\"></span>. The assessment of the most relevant activity in this </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1003\">contractual arrangement is subject to judgement. The Group establishes the mine plan and the operating budget and has the ability to appoint the key management </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1004\">personnel, demonstrating that the Group has the existing rights to direct the relevant activities of Minera Escondida Ltda.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1005\">2 <span class=\"_ _42\"> </span>The acquisition of BHP\u2019s 100 per cent interest in OZ Minerals Limited completed on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019<span class=\"_ _2\"></span> for further information. </div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gs1006\">3 <span class=\"_ _42\"> </span>The Group has an effective interest of 92.5 per cent in BHP Iron Ore (Jimblebar) Pty Ltd; however<span class=\"_ _2a\"></span>, by virtue of the shareholder agreement with ITOCHU Iron Ore Australia Pty </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1007\">Ltd and Mitsui &amp; Co. Iron Ore Exploration &amp; Mining Pty Ltd, the Group\u2019s interest in the Jimblebar mining operation is 85 per cent, which is consistent with the other respective </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1008\">contractual arrangements at Western <span class=\"_ _2\"></span>Australia Iron Ore.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gs100a\">31 <span class=\"_ _47\"> </span>Investments accounted for using the equity method<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs100b\">Significant interests in equity accounted investments of the Group are those with the most significant contribution to the Group\u2019s net profit or net assets. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs100c\">The Group\u2019s ownership interest in significant equity accounted investments results are listed in the table below<span class=\"_ _2\"></span>. </div><div class=\"t m0 h41 ff78 fs3 fc3 sc0 ls5 ws2 gs100d\">Significant associates <span class=\"ff75\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs100e\">and joint ventures </div><div class=\"t m0 h41 ff78 fs3 fc3 sc0 ls5 ws2 gs100f\">Country of incorporation/ </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1010\">principal place of business<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1011\">Associate or </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1012\">joint venture<span class=\"_ _ee\"> </span>Principal activity<span class=\"_ _1a3\"> </span>Reporting date </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1013\">Ownership interest </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1014\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1015\">%<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1016\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1017\">%<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1018\">Compa\u00f1\u00eda Minera <span class=\"_ _2\"></span>Antamina S.A. </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1019\">(Antamina)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs101a\">Peru<span class=\"_ _108\"> </span>Associate<span class=\"_ _5d\"> </span>Copper and zinc mining<span class=\"_ _f2\"> </span>31 December<span class=\"_ _6f\"> </span><span class=\"ff75\">33.75<span class=\"_ _64\"> </span></span>33.75<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs101b\">Samarco Minera\u00e7\u00e3o S.A. </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs101c\">(Samarco)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs101d\">Brazil<span class=\"_ _fa\"> </span>Joint venture<span class=\"_ _22\"> </span>Iron ore mining<span class=\"_ _33d\"> </span>31 December<span class=\"_ _6f\"> </span><span class=\"ff75\">50.00<span class=\"_ _140\"> </span></span>50.00<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs101e\">V<span class=\"_ _2\"></span>oting in relation to relevant activities in <span class=\"_ _2\"></span>Antamina, determined to be the approval of the operating and capital budgets, does not require unanimous </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs101f\">consent of all participants to the arrangement, therefore joint control does not exist. Instead, because the Group has the power to participate in the </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1020\">financial and operating policies of the investee, this investment is accounted for as an associate.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1021\">Samarco is jointly owned by BHP Billiton Brasil Ltda (BHP<span class=\"_ _2\"></span> Brasil) and V<span class=\"_ _2\"></span>ale S.A. (V<span class=\"_ _2\"></span>ale). <span class=\"_ _2a\"></span>As the Samarco entity has the rights to the assets and obligations </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1022\">to the liabilities relating to the joint arrangement and not its owners, this investment is accounted for as a joint venture.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1023\">The Group is restricted in its ability to make dividend payments from its investments in associates and joint ventures as any such payments require the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1024\">approval of all investors in the associates and joint ventures. The ownership interest at the Group\u2019s and the associates\u2019<span class=\"_ _2\"></span> or joint ventures\u2019<span class=\"_ _2\"></span> reporting dates </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1025\">are the same. When the annual financial reporting date is different to the Group\u2019s, financial information is obtained as at 30 June in order to report on an </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1026\">annual basis consistent with the Group\u2019s reporting date.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1027\">The movement for the year in the Group\u2019s investments accounted for using the equity method is as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1028\">Y<span class=\"_ _2\"></span>ear ended 30 June 2023  </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1029\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs102a\">Investment in </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs102b\">associates<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs102c\">Investment in </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs102d\">joint ventures<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs102e\">T<span class=\"_ _2\"></span>otal equity </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs102f\">accounted </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1030\">investments<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs1031\">At the beginning of the financial year<span class=\"_ _192\"> </span><span class=\"ff75\">1,420<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _64\"> </span></span>1,420<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs1032\">Profit/(loss) from equity accounted investments, related impairments and expenses<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gs1033\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs1034\">379<span class=\"_ _25\"> </span>215<span class=\"_ _6f\"> </span>594<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1035\">Investment in equity accounted investments <span class=\"_ _184\"> </span><span class=\"ff75\">149<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _6f\"> </span></span>149<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1036\">Dividends received from equity accounted investments<span class=\"_ _33e\"> </span><span class=\"ff75\">(328)<span class=\"_ _b0\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _9c\"> </span></span>(328)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1037\">Other</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gs1038\">1</div><div class=\"t m0 h4 ff78 fs2 fc3 sc0 ls5 ws2 gs1039\"> \u2212<span class=\"_ _9c\"> </span><span class=\"ff75\">(215)<span class=\"_ _95\"> </span>(215)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff78 fs2 fc3 sc0 ls5 ws2 gs103a\">At the end of the financial year<span class=\"_ _176\"> </span><span class=\"ff75\">1,620<span class=\"_ _55\"> </span></span> \u2212<span class=\"_ _64\"> </span><span class=\"ff75\">1,620<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gs103b\">1 <span class=\"_ _42\"> </span>Represents financial impacts of Samarco dam failure in the Group\u2019s loss from equity accounted investments, related impairments and expenses. Refer to note 4 \u2018Significant </div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gs103c\">events \u2013 Samarco dam failure\u2019 for further information.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs103d\">The following table summarises the financial information relating to each of the Group\u2019s significant equity accounted investments. BHP<span class=\"_ _2\"></span> Brasil\u2019s 50 per cent </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs103e\">portion of Samarco\u2019s commitments, for which BHP<span class=\"_ _2\"></span> Brasil has no funding obligation, is US$500 million (2022: US$350 million).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs103f\">2023  </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1040\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1041\">Associates<span class=\"_ _54\"> </span>Joint ventures<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1042\">T<span class=\"_ _2\"></span>otal<span class=\"_ _33f\"></span>Antamina<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1043\">Individually </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1044\">immaterial<span class=\"_ _39c\"> </span></div><div class=\"t m0 h137 ff75 fsfe fc3 sc0 ls5 ws2 gs1045\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1046\">Samarco<span class=\"_ _39c\"> </span></div><div class=\"t m0 h137 ff75 fsfe fc3 sc0 ls5 ws2 gs1047\">2<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1048\">Individually </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1049\">immaterial </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs104a\">Current assets<span class=\"_ _197\"> </span><span class=\"ff75\">1,519<span class=\"_ _28e\"> </span>537<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h138 ff75 fs21 fc3 sc0 ls5 ws2 gs104b\">3<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs104c\">Non-current assets<span class=\"_ _340\"> </span><span class=\"ff75\">5,670<span class=\"_ _1b1\"> </span>5,739<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs104d\">Current liabilities<span class=\"_ _2a4\"> </span><span class=\"ff75\">(774)<span class=\"_ _12\"> </span>(1<span class=\"_ _2\"></span>1,167)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h138 ff75 fs21 fc3 sc0 ls5 ws2 gs104e\">4<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs104f\">Non-current liabilities<span class=\"_ _224\"> </span><span class=\"ff75\">(1,944)<span class=\"_ _10\"> </span>(10,614)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs1050\">Net assets/(liabilities) \u2013 100%<span class=\"_ _30a\"> </span><span class=\"ff75\">4,471<span class=\"_ _1ab\"> </span>(15,505)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs1051\">Net assets/(liabilities) \u2013 Group share <span class=\"_ _e2\"> </span><span class=\"ff75\">1,509<span class=\"_ _1de\"> </span>(7,753)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1052\">Adjustments to net assets related to accounting policy adjustments<span class=\"_ _20\"> </span><span class=\"ff75\">(79)<span class=\"_ _341\"> </span>291<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h138 ff75 fs21 fc3 sc0 ls5 ws2 gs1053\">5<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1054\">Investment in Samarco<span class=\"_ _141\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _341\"> </span><span class=\"ff75\">516<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h138 ff75 fs21 fc3 sc0 ls5 ws2 gs1055\">6<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1056\">Impairment of the carrying value of the investment in Samarco <span class=\"_ _e1\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _342\"> </span><span class=\"ff75\">(1,041)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h138 ff75 fs21 fc3 sc0 ls5 ws2 gs1057\">7<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1058\">Additional share of Samarco losses<span class=\"_ _244\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _1b1\"> </span><span class=\"ff75\">6,034<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h138 ff75 fs21 fc3 sc0 ls5 ws2 gs1059\">8<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs105a\">Unrecognised losses<span class=\"_ _343\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _1b1\"> </span><span class=\"ff75\">1,953<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h138 ff75 fs21 fc3 sc0 ls5 ws2 gs105b\">9<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs105c\">Carrying amount of investments accounted for using the equity method<span class=\"_ _201\"> </span>1,430<span class=\"_ _140\"> </span>190<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _6f\"> </span> \u2212<span class=\"_ _e7\"> </span></span> 1,620<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs105d\">Revenue \u2013 100%<span class=\"_ _343\"> </span><span class=\"ff75\">4,350<span class=\"_ _d8\"> </span>1,554<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs105e\">Profit/(loss) from Continuing operations \u2013 100% <span class=\"_ _216\"> </span><span class=\"ff75\">1,571<span class=\"_ _1ab\"> </span>(3,018)</span></div><div class=\"t m0 h138 ff75 fs21 fc3 sc0 ls5 ws2 gs105f\">10<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs1060\">Share of profit/(loss) of equity accounted investments <span class=\"_ _21e\"> </span><span class=\"ff75\">530<span class=\"_ _1de\"> </span>(1,509)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs1061\">Adjustments to share of profit/(loss) related to accounting policy adjustments<span class=\"_ _120\"> </span><span class=\"ff75\">(79)<span class=\"_ _14\"> </span>23<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h138 ff75 fs21 fc3 sc0 lse7 ws12c gs1062\">11<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1063\">Impairment of the carrying value of the investment in Samarco <span class=\"_ _e1\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _108\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1064\">Additional share of Samarco losses<span class=\"_ _244\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _28e\"> </span><span class=\"ff75\">452<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1065\">Fair value change on forward exchange derivatives<span class=\"_ _255\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _28e\"> </span><span class=\"ff75\">471<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1066\">Unrecognised losses<span class=\"_ _343\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _28\"> </span><span class=\"ff75\">778<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h138 ff75 fs21 fc3 sc0 ls5 ws2 gs1067\">9<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff78 fs2 fc3 sc0 ls95 wsab gs1068\">Profit/(loss) from equity accounted <span class=\"_ _2\"></span>investments, related impairments and expenses<span class=\"_ _203\"> </span><span class=\"ff75 ls5 ws2\">451<span class=\"_ _db\"> </span>(72)<span class=\"_ _6f\"> </span>215<span class=\"_ _203\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _140\"> </span></span>594<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs1069\">Comprehensive income \u2013 100%<span class=\"_ _3f\"> </span><span class=\"ff75\">1,571<span class=\"_ _1de\"> </span>(3,018)<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff78 fs2 fc3 sc0 ls5 ws2 gs106a\">Share of comprehensive income/(loss) \u2013 Group share in equity </div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs106b\">accounted investments<span class=\"_ _b4\"> </span>451<span class=\"_ _db\"> </span>(72)<span class=\"_ _203\"> </span>215<span class=\"_ _6f\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _140\"> </span></span>594<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs106c\">Dividends received from equity accounted investments <span class=\"_ _2fc\"> </span>327<span class=\"_ _1a3\"> </span>1<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _140\"> </span></span>328<span class=\"_ _39c\"> </span></div>2022  US$M<span class=\"_ _39c\"> </span>Associates<span class=\"_ _20e\"> </span>Joint ventures<span class=\"_ _39c\"> </span>Individually immaterial<span class=\"_ _39c\"> </span>1<span class=\"_ _39c\"> </span>Samarco<span class=\"_ _39c\"> </span>2<span class=\"_ _39c\"> </span>Individually immaterial Current assets<span class=\"_ _197\"> </span>1,275<span class=\"_ _7a\"> </span>499<span class=\"_ _39c\"> </span>3<span class=\"_ _39c\"> </span>Non-current assets<span class=\"_ _340\"> </span>5,293<span class=\"_ _1b1\"> </span>5,717<span class=\"_ _39c\"> </span>Current liabilities<span class=\"_ _2a4\"> </span>(847)<span class=\"_ _f9\"> </span>(10,830)<span class=\"_ _39c\"> </span>4<span class=\"_ _39c\"> </span>Non-current liabilities<span class=\"_ _224\"> </span>(1,851)<span class=\"_ _18\"> </span>(7,873)<span class=\"_ _39c\"> </span>Net assets/(liabilities) \u2013 100%<span class=\"_ _30a\"> </span><span class=\"ff76\">3,870<span class=\"_ _1ab\"> </span>(12,487)<span class=\"_ _39c\"> </span></span>Net assets/(liabilities) \u2013 Group share <span class=\"_ _e2\"> </span><span class=\"ff76\">1,306<span class=\"_ _1de\"> </span>(6,244)<span class=\"_ _39c\"> </span></span>Adjustments to net assets related to accounting policy adjustments<span class=\"_ _32\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _341\"> </span></span>268<span class=\"_ _39c\"> </span>5<span class=\"_ _39c\"> </span>Investment in Samarco<span class=\"_ _141\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _341\"> </span></span>516<span class=\"_ _39c\"> </span>6<span class=\"_ _39c\"> </span>Impairment of the carrying value of the investment in Samarco <span class=\"_ _e1\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _345\"> </span></span>(1,041)<span class=\"_ _39c\"> </span>7<span class=\"_ _39c\"> </span>Additional share of Samarco losses<span class=\"_ _244\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _1b1\"> </span></span>5,326<span class=\"_ _39c\"> </span>Unrecognised losses<span class=\"_ _343\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _346\"> </span></span>1,175<span class=\"_ _39c\"> </span>9<span class=\"_ _39c\"> </span>Carrying amount of investments accounted for using the equity method<span class=\"_ _70\"> </span>1,306<span class=\"_ _95\"> </span><span class=\"lsd3 ws102\">11<span class=\"_ _0\"></span>4<span class=\"_ _68\"> </span></span><span class=\"ff77\"> \u2212<span class=\"_ _6f\"> </span> \u2212<span class=\"_ _21\"> </span></span>1,420<span class=\"_ _39c\"> </span>Revenue \u2013 100%<span class=\"_ _343\"> </span><span class=\"ff76\">5,264<span class=\"_ _d8\"> </span>1,670<span class=\"_ _39c\"> </span></span>Profit/(loss) from Continuing operations \u2013 100% <span class=\"_ _216\"> </span><span class=\"ff76\">2,133<span class=\"_ _1d5\"> </span>(528)<span class=\"_ _39c\"> </span></span>10<span class=\"_ _39c\"> </span>Share of profit/(loss) of equity accounted investments <span class=\"_ _21e\"> </span><span class=\"ff76\">720<span class=\"_ _d8\"> </span>(276)<span class=\"_ _39c\"> </span></span>11<span class=\"_ _39c\"> </span>Impairment of the carrying value of the investment in Samarco <span class=\"_ _e1\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _108\"> </span> \u2212<span class=\"_ _39c\"> </span></span>Additional share of Samarco losses<span class=\"_ _244\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _28e\"> </span></span>290<span class=\"_ _39c\"> </span>Fair value change on forward exchange derivatives<span class=\"_ _255\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _d6\"> </span></span>(81)<span class=\"_ _39c\"> </span>Unrecognised losses<span class=\"_ _343\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _137\"> </span></span>(609)<span class=\"_ _39c\"> </span>9<span class=\"_ _39c\"> </span>Profit/(loss) from equity accounted investments, related impairments and expenses<span class=\"_ _1eb\"> </span><span class=\"ff76\">720<span class=\"_ _db\"> </span>(63)<span class=\"_ _95\"> </span>(676)<span class=\"_ _203\"> </span></span> \u2212<span class=\"_ _db\"> </span><span class=\"ff76\">(19)<span class=\"_ _39c\"> </span></span>Comprehensive income \u2013 100%<span class=\"_ _3f\"> </span><span class=\"ff76\">2,133<span class=\"_ _341\"> </span>(528)<span class=\"_ _39c\"> </span></span>Share of comprehensive income/(loss) \u2013 Group share in equity accounted investments<span class=\"_ _14f\"> </span><span class=\"ff76\">720<span class=\"_ _db\"> </span>(63)<span class=\"_ _95\"> </span>(676)<span class=\"_ _c8\"> </span></span> \u2212<span class=\"_ _db\"> </span><span class=\"ff76\">(19)<span class=\"_ _39c\"> </span></span>Dividends received from equity accounted investments <span class=\"_ _94\"> </span>776<span class=\"_ _1fe\"> </span><span class=\"lsd3 ws102\">11<span class=\"_ _1fc\"> </span></span><span class=\"ff77\"> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _140\"> </span></span>787<span class=\"_ _39c\"> </span>2021  US$M Associates<span class=\"_ _17\"> </span>Joint ventures<span class=\"_ _39c\"> </span>Antamina<span class=\"_ _51\"> </span>Cerrej\u00f3n<span class=\"_ _39c\"> </span>Individually immaterial<span class=\"_ _d2\"> </span>Samarco<span class=\"_ _39c\"> </span>2<span class=\"_ _39c\"> </span>Individually immaterial Revenue \u2013 100%<span class=\"_ _3f\"> </span><span class=\"ff76\">4,822<span class=\"_ _140\"> </span>844<span class=\"_ _28e\"> </span>814<span class=\"_ _39c\"> </span></span>Profit/(loss) from Continuing operations \u2013 100% <span class=\"_ _2ab\"> </span><span class=\"ff76\">1,847<span class=\"_ _db\"> </span>(43)<span class=\"_ _1e4\"> </span>(2,202)<span class=\"_ _39c\"> </span></span>10<span class=\"_ _39c\"> </span>Share of profit/(loss) of equity accounted investments <span class=\"_ _a5\"> </span><span class=\"ff76\">623<span class=\"_ _db\"> </span>(14)<span class=\"_ _1dd\"> </span>(1,076)<span class=\"_ _39c\"> </span></span>11<span class=\"_ _39c\"> </span>Impairment of the carrying value of the investment in Cerrej\u00f3n<span class=\"_ _67\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _12a\"> </span></span>(466)<span class=\"_ _153\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _39c\"> </span></span>Impairment of the carrying value of the investment in Samarco <span class=\"_ _18\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _6f\"> </span> \u2212<span class=\"_ _1a9\"> </span></span><span class=\"lsd3 ws102\">(<span class=\"_ _43\"></span>111<span class=\"_ _0\"></span>)<span class=\"_ _39c\"> </span></span>7<span class=\"_ _39c\"> </span>Additional share of Samarco losses<span class=\"_ _1ed\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _290\"> </span></span>85<span class=\"_ _39c\"> </span>Fair value change on forward exchange derivatives<span class=\"_ _1c6\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _6f\"> </span> \u2212<span class=\"_ _28e\"> </span></span>136<span class=\"_ _39c\"> </span>Unrecognised losses<span class=\"_ _348\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _14\"> </span></span>(24)<span class=\"_ _39c\"> </span>9<span class=\"_ _39c\"> </span>Profit/(loss) from equity accounted investments, related impairments <span class=\"ff76\"> </span>and expenses<span class=\"_ _142\"> </span>623<span class=\"_ _12a\"> </span>(480)<span class=\"_ _1fd\"> </span>(68)<span class=\"_ _e\"> </span>(990)<span class=\"_ _c8\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _11\"> </span></span>(915)<span class=\"_ _39c\"> </span>Comprehensive income/(loss) \u2013 100%<span class=\"_ _1b2\"> </span><span class=\"ff76\">1,847<span class=\"_ _db\"> </span>(43)<span class=\"_ _18\"> </span>(2,202)<span class=\"_ _39c\"> </span></span>Share of comprehensive income/(loss) \u2013 Group share in equity <span class=\"ff76\"> </span>accounted investments<span class=\"_ _14a\"> </span>623<span class=\"_ _12a\"> </span>(480)<span class=\"_ _1fd\"> </span>(68)<span class=\"_ _e\"> </span>(990)<span class=\"_ _c8\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _12a\"> </span></span>(915)<span class=\"_ _39c\"> </span>Dividends received from equity accounted investments <span class=\"_ _1ac\"> </span>714<span class=\"_ _154\"> </span>13<span class=\"_ _1b\"> </span>10<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _25\"> </span> \u2212<span class=\"_ _140\"> </span></span>737<span class=\"_ _39c\"> </span>1 <span class=\"_ _42\"> </span>The unrecognised share of gain for the period was US$76 million (2022: unrecognised share of gain for the period was US$16 million), which decreased the cumulative losses to US$141 million (2022: decrease to US$217 million).<span class=\"_ _39c\"> </span>2 <span class=\"_ _42\"> </span>Refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 for further information regarding the financial impact of the Samarco dam failure which occurred in November 2015 on BHP Brasil\u2019s share of Samarco\u2019<span class=\"_ _2\"></span>s losses. 3 <span class=\"_ _42\"> </span>Includes cash and cash equivalents of US$138 million (2022: US$106 million).<span class=\"_ _39c\"> </span>4 <span class=\"_ _42\"> </span>Includes current financial liabilities (excluding trade and other payables and provisions) of US$7,154 million (2022: US$6,837 million).<span class=\"_ _39c\"> </span>5 <span class=\"_ _42\"> </span>Relates mainly to dividends declared by Samarco that remain unpaid at balance date and which, in accordance with the Group\u2019s accounting policy<span class=\"_ _2\"></span>, are recognised when received not receivable.<span class=\"_ _39c\"> </span>6 <span class=\"_ _42\"> </span>Working capital funding provided to Samarco during the period is capitalised as part of the Group\u2019s investments in joint ventures and disclosed as an impairment included within the Samarco impairment expense line item.<span class=\"_ _39c\"> </span>7 <span class=\"_ _42\"> </span>In the year ended 30 June 2016 BHP Brasil adjusted its investment in Samarco to US$ nil (resulting from US$(655) million share of loss from Samarco and US$(525) million impairment). <span class=\"_ _2\"></span>Additional cumulative impairment losses relating to working capital funding of US$(516) million have also been recognised.<span class=\"_ _39c\"> </span>8 <span class=\"_ _42\"> </span>BHP Brasil has recognised accumulated additional share of Samarco losses of US$(6,034) million resulting from US$(4,795) million provisions relating to the Samarco dam failure, including US$(1,239) million recognised as net finance costs.<span class=\"_ _39c\"> </span>9 <span class=\"_ _42\"> </span>Share of Samarco\u2019s losses for which BHP Brasil does not have an obligation to fund.<span class=\"_ _39c\"> </span>10  Includes depreciation and amortisation of US$144 million (2022: US$205 million; 2021: US$154 million), interest income of US$42 million (2022: US$19 million; 2021: US$1 million), interest expense of US$1,384 million (2022: US$628 million; 2021: US$492 million) and income tax (expense)/benefit of US$(213) million (2022: US$(7) million; 2021: US$(303) million).<span class=\"_ _39c\"> </span>1<span class=\"_ _2\"></span>1  Includes accounting policy adjustments mainly related to the removal of foreign exchange gains on excluded dividends payable.<span class=\"_ _39c\"> </span><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gs10c8\">32 <span class=\"_ _47\"> </span>Interests in joint operations<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs10c9\">Significant joint operations of the Group are those with the most significant contributions to the Group\u2019s net profit or net assets. <span class=\"_ _2\"></span>The Group\u2019s interest in the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs10ca\">joint operations results are listed in the table below<span class=\"_ _2\"></span>. </div><div class=\"t m0 h41 ff78 fs3 fc3 sc0 ls5 ws2 gs10cb\">Significant joint operations <span class=\"_ _11f\"> </span><span class=\"ff75\">Country of operation<span class=\"_ _98\"> </span>Principal activity<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs10cc\">Group\u2019s interest<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs10cd\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs10ce\">%<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs10cf\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs10d0\">%<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs10d1\">Mt Goldsworthy</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gs10d2\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs10d3\">Australia<span class=\"_ _1e2\"> </span>Iron ore mining<span class=\"_ _2e3\"> </span><span class=\"ff75\">85<span class=\"_ _6d\"> </span></span>85<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs10d4\">Mt Newman</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gs10d5\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs10d6\">Australia<span class=\"_ _1e2\"> </span>Iron ore mining<span class=\"_ _2e3\"> </span><span class=\"ff75\">85<span class=\"_ _6d\"> </span></span>85<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs10d7\">Y<span class=\"_ _2\"></span>andi</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gs10d8\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs10d9\">Australia<span class=\"_ _1e2\"> </span>Iron ore mining <span class=\"_ _11a\"> </span><span class=\"ff75\">85<span class=\"_ _6d\"> </span></span>85<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs10da\">Central Queensland Coal <span class=\"_ _2\"></span>Associates<span class=\"_ _10\"> </span>Australia<span class=\"_ _58\"> </span>Coal mining <span class=\"_ _11e\"> </span><span class=\"ff75\">50<span class=\"_ _a\"> </span></span>50<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gs10db\">1 <span class=\"_ _42\"> </span>These contractual arrangements are controlled by the Group and do not meet the definition of joint operations. However<span class=\"_ _2\"></span>, as they are formed by contractual arrangement and </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs10dc\">are not entities, the Group recognises its share of assets, liabilities, revenue and expenses arising from these arrangements.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs10dd\">Assets held in joint operations subject to significant restrictions are as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs10de\">Group\u2019s share<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs10df\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs10e0\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs10e1\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs10e2\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs10e3\">Current assets<span class=\"_ _273\"> </span><span class=\"ff75\">1,561<span class=\"_ _64\"> </span></span>1,928<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs10e4\">Non-current assets<span class=\"_ _349\"> </span><span class=\"ff75\">26,370<span class=\"_ _242\"> </span></span>26,256<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs10e5\">T<span class=\"_ _2\"></span>otal assets</div><div class=\"t m0 h138 ff75 fs21 fc3 sc0 ls5 ws2 gs10e6\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs10e7\">27,931<span class=\"_ _242\"> </span><span class=\"ff76\">28,184<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs10e8\">1 <span class=\"_ _42\"> </span>While the Group is unrestricted in its ability to sell a share of its interest in these joint operations, it does not have the right to sell individual assets that are used in these joint </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs10e9\">operations without the unanimous consent of the other participants. The assets in these joint operations are also restricted to the extent that they are only available to be used </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs10ea\">by the joint operation itself and not by other operations of the Group.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gs10eb\">33 <span class=\"_ _47\"> </span>Related party transactions<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs10ec\">The Group\u2019s related parties are predominantly subsidiaries, associates and joint ventures, and key management personnel of the Group. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs10ed\">Disclosures relating to key management personnel are set out in note 25 \u2018Key management personnel\u2019. T<span class=\"_ _2\"></span>ransactions between each parent company and </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs10ee\">its subsidiaries are eliminated on consolidation and are not disclosed in this note.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs10ef\">\u2013  <span class=\"ff76\">All transactions to/from related parties are made at arm\u2019s length, i.e. at normal market prices and rates and on normal commercial terms.<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs10f0\">\u2013  <span class=\"ff76\">Outstanding balances at year-end are unsecured and settlement occurs in cash. Loan amounts owing from related parties represent secured loans </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs10f1\">made to associates and joint ventures under co-funding arrangements. Such loans are made on an arm\u2019s length basis. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs10f2\">\u2013  <span class=\"ff76\">No guarantees are provided or received for any related party receivables or payables. </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs10f3\">\u2013  <span class=\"ff76\">No provision for expected credit losses has been recognised in relation to any outstanding balances and no expense has been recognised in respect of </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs10f4\">expected credit losses due from related parties.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs10f5\">\u2013  There were no other related party transactions in the year ended 30 June 2023 (2022: US$ nil), other than those with post-employment benefit plans </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs10f6\">for the benefit of Group employees. These are shown in note 27 \u2018Employee benefits, restructuring and post-retirement employee benefits provisions\u2019.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs10f7\">\u2013  Related party transactions with Samarco are described in note 4 \u2018Significant events \u2013 Samarco dam failure\u2019<span class=\"_ _39c\"> </span>.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs10f8\">Further disclosures related to related party transactions are as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gs10f9\">T<span class=\"_ _2\"></span>ransactions with related parties<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs10fa\">Joint ventures<span class=\"_ _34a\"> </span>Associates<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs10fb\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs10fc\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs10fd\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs10fe\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs10ff\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1100\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1101\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1102\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs1103\">Sales of goods/services <span class=\"_ _2c7\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span></span> \u2212<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs1104\">Purchases of goods/services <span class=\"_ _15e\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _f2\"> </span><span class=\"ff75\">1,589.094<span class=\"_ _38\"> </span></span></span></span>1,852.132<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs1105\">Interest income<span class=\"_ _34b\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span></span> \u2212<span class=\"_ _64\"> </span></span>0.398<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs1106\">Interest expense<span class=\"_ _34c\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span></span> \u2212<span class=\"_ _64\"> </span></span>0.005<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs1107\">Dividends received<span class=\"_ _34d\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _19b\"> </span><span class=\"ff75\">327.679<span class=\"_ _19b\"> </span></span></span></span>787.208<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs1108\">Net loans made to/(repayments from) related parties<span class=\"_ _14d\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _c5\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span></span> \u2212<span class=\"_ _37\"> </span></span>(23.554)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gs1109\">Outstanding balances with related parties<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs110a\">Joint ventures<span class=\"_ _34a\"> </span>Associates<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs110b\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs110c\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs110d\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs110e\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs110f\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1110\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1111\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1112\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs1113\">T<span class=\"_ _2\"></span>rade amounts owing to related parties <span class=\"_ _2c5\"> </span><span class=\"ff75\">\u2013<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _19b\"> </span></span>246.239<span class=\"_ _19b\"> </span></span>351.607<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs1114\">Loan amounts owing to related parties<span class=\"_ _ab\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span></span> \u2212<span class=\"_ _33d\"> </span><span class=\"ff77\">\u2212<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs1115\">T<span class=\"_ _2\"></span>rade amounts owing from related parties<span class=\"_ _79\"> </span><span class=\"ff75\">\u2013<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _64\"> </span></span>6.730<span class=\"_ _64\"> </span></span>6.855<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs1116\">Loan amounts owing from related parties<span class=\"_ _79\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span></span> \u2212<span class=\"_ _33d\"> </span><span class=\"ff77\">\u2212<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h11 ff75 fsa fc3 sc0 ls5 ws2 gs1118\">Unrecognised items and uncertain events<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gs1119\">34 <span class=\"_ _47\"> </span>Contingent liabilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs111a\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs111b\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs111c\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs111d\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs111e\">Associates and joint ventures<span class=\"_ _39c\"> </span></div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gs111f\">1</div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1120\"> <span class=\"_ _1f5\"> </span><span class=\"ff75\">1,094<span class=\"_ _64\"> </span></span>1,541<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1121\">Subsidiaries and joint operations</div><div class=\"t m0 h42 ff76 fs21 fc3 sc0 ls5 ws2 gs1122\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs1123\">1,184<span class=\"_ _25\"> </span><span class=\"ff76\">925<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs1124\">T<span class=\"_ _2\"></span>otal<span class=\"_ _2bb\"> </span>2,278<span class=\"_ _64\"> </span><span class=\"ff76\">2,466<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1125\">1 <span class=\"_ _42\"> </span>There are a number of matters, for which it is not possible at this time to provide a range of possible outcomes or a reliable estimate of potential future exposures, and for </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1126\">which no amounts have been included in the table above.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1127\">A<span class=\"_ _2\"></span> contingent liability is a possible obligation arising from past events and whose existence will be confirmed only by occurrence or non-occurrence of one </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1128\">or more uncertain future events not wholly within the control of the Group. <span class=\"_ _2\"></span>A<span class=\"_ _2\"></span> contingent liability may also be a present obligation arising from past events </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1129\">but is not recognised on the basis that an outflow of economic resources to settle the obligation is not viewed as probable, or the amount of the obligation </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs112a\">cannot be reliably measured. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs112b\">When the Group has a present obligation, an outflow of economic resources is assessed as probable and the Group can reliably measure the obligation, </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs112c\">a provision is recognised.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs112d\">The Group has entered into various counter-indemnities of bank and performance guarantees related to its own future performance, which are in the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs112e\">normal course of business. The likelihood of these guarantees being called upon is considered remote.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs112f\">The Group presently has tax matters, litigation and other claims, for which the timing of resolution and potential economic outflow are uncertain. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1130\">Obligations assessed as having probable future economic outflows capable of reliable measurement are provided at reporting date and matters </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1131\">assessed as having possible future economic outflows capable of reliable measurement are included in the total amount of contingent liabilities above. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1132\">Individually significant matters, including narrative on potential future exposures incapable of reliable measurement, are disclosed below<span class=\"_ _2\"></span>, to the extent that </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1133\">disclosure does not prejudice the Group.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h7 ff78 fs5 fc3 sc0 ls5 ws2 gs1134\">Uncertain tax and </div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gs1135\">royalty matters<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1136\">The Group is subject to a range of taxes and royalties across many jurisdictions, the application of which is uncertain </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1137\">in some regards. Changes in tax law<span class=\"_ _2\"></span>, changes in interpretation of tax law<span class=\"_ _2\"></span>, periodic challenges and disagreements with </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1138\">tax authorities, and legal proceedings result in uncertainty of the outcome of the application of taxes and royalties to the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1139\">Group\u2019s business. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs113a\">T<span class=\"_ _2a\"></span>o the extent uncertain tax and royalty matters give rise to a contingent liability<span class=\"_ _2\"></span>, an estimate of the potential liability is </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs113b\">included within the table above, where it is capable of reliable measurement.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gs113c\">Samarco </div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gs113d\">contingent liabilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs113e\">The table above includes contingent liabilities related to the Group\u2019s equity accounted investment in Samarco to the extent </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs113f\">they are capable of reliable measurement. Details of contingent liabilities related to Samarco are disclosed in note 4 </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1140\">\u2018Significant events \u2013 Samarco dam failure\u2019.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gs1141\">Divestments </div><div class=\"t m0 h7 ff75 fs5 fc3 sc0 ls5 ws2 gs1142\">and demergers<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1143\">Where the Group divests or demerges entities, it is generally agreed to provide certain indemnities to the acquiring or </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1144\">demerged entity<span class=\"_ _2\"></span>. Such indemnities include those provided as part of the demerger of South32 Ltd in May 2015, divestment </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1145\">of Group\u2019s Onshore US assets in September 2018 and October 2018, divestment of BMC in May 2022 and the merger </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1146\">of the Group\u2019s Petroleum business with W<span class=\"_ _2\"></span>oodside in June 2022. No material claims have been made pursuant to these </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1147\">indemnities as at 30 June 2023.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gs1148\">35 <span class=\"_ _47\"> </span>Subsequent events<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1149\">On 14 <span class=\"_ _2\"></span>August 2023, an application to commence a class action was filed in the High Court of South <span class=\"_ _2\"></span>Africa on behalf of current and former mineworkers, </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs114a\">and the dependants of certain mineworkers, who have contracted coal mine dust lung disease and who work or have worked on specified coal mines </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs114b\">in South <span class=\"_ _2\"></span>Africa between 1965 to date. \u2018BHP Billiton Plc Incorporated\u2019<span class=\"_ _2\"></span> was named as one of four respondents, alongside South32 SA<span class=\"_ _2\"></span> Holdings Limited, </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs114c\">South32 Coal SA<span class=\"_ _2\"></span> (Pty) Limited, and Seriti Power (Proprietary) Limited.  The amount of damages sought by the <span class=\"_ _2\"></span>Applicants on behalf of the putative class </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs114d\">is unspecified.  Given the preliminary status of this matter<span class=\"_ _2\"></span>, it is not possible at this time to provide a range of possible outcomes or a reliable estimate of </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs114e\">potential future exposures for the Group.  However<span class=\"_ _2\"></span>, the Group anticipates that claims for indemnification may be made under the terms of the Separation </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs114f\">Deed agreed as part of the demerger of South32 Limited in 2015.  </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1150\">Other than the matters outlined above or elsewhere in the Financial Statements, no matters or circumstances have arisen since the end of the financial </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1151\">year that have significantly affected, or may significantly af<span class=\"_ _2\"></span>fect, the operations, results of operations or state of affairs of the Group in subsequent </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1152\">accounting periods.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h11 ff75 fsa fc3 sc0 ls5 ws2 gs1153\">Other items<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gs1154\">36 <span class=\"_ _47\"> </span>Auditor\u2019s remuneration<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1155\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1156\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1157\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1158\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1159\">2021 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs115a\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs115b\">Fees payable to the Group\u2019<span class=\"_ _2\"></span>s auditors for assurance services </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs115c\">Audit of the Group\u2019s <span class=\"_ _2\"></span>Annual Report<span class=\"_ _160\"> </span><span class=\"ff75\">9.700<span class=\"_ _64\"> </span></span>9.816<span class=\"_ _1c\"> </span>10.642<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs115d\">Audit of the accounts of subsidiaries, joint ventures and associates<span class=\"_ _21a\"> </span><span class=\"ff75\">0.551<span class=\"_ _64\"> </span></span>0.605<span class=\"_ _64\"> </span>1.234<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs115e\">Audit-related assurance services required by legislation to be provided by the auditor<span class=\"_ _1ba\"> </span><span class=\"ff75\">1.808<span class=\"_ _64\"> </span></span>1.933<span class=\"_ _64\"> </span>1.770<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs115f\">Other assurance and agreed-upon procedures under legislation or contractual arrangements<span class=\"_ _20\"> </span><span class=\"ff75\">1.991<span class=\"_ _140\"> </span></span>7.938<span class=\"_ _64\"> </span>1.867<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs1160\">T<span class=\"_ _2\"></span>otal assurance services<span class=\"_ _ac\"> </span>14.050<span class=\"_ _242\"> </span><span class=\"ff76\">20.292<span class=\"_ _1c\"> </span>15.513<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs1161\">Fees payable to the Group\u2019<span class=\"_ _2\"></span>s auditors for non-assurance services<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs1162\">Other services<span class=\"_ _2f8\"> </span><span class=\"ff75\">0.180<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff75 fs2 fc3 sc0 ls5 ws2 gs1163\">T<span class=\"_ _2\"></span>otal other services<span class=\"_ _26c\"> </span>0.180<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs1164\">T<span class=\"_ _2\"></span>otal fees<span class=\"_ _91\"> </span>14.230<span class=\"_ _242\"> </span><span class=\"ff76\">20.292<span class=\"_ _1c\"> </span>15.513<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1165\">All amounts were paid to EY or EY<span class=\"_ _2\"></span> affiliated firms with fees determined, and predominantly billed, in US dollars.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gs1167\">Fees payable to the Group\u2019<span class=\"_ _2\"></span>s auditors for assurance services </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1168\">Audit of the Group\u2019s <span class=\"_ _2\"></span>Annual Report comprises fees for auditing the statutory financial report of the Group and includes audit work in relation to compliance </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1169\">with section 404 of the US Sarbanes-Oxley <span class=\"_ _2\"></span>Act.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs116a\">Audit-related assurance services required by legislation to be provided by the auditors mainly comprises review of the half-year report.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs116b\">Other assurance services comprise assurance in respect of the Group\u2019s sustainability reporting, economic contribution reporting, and other non-<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs116c\">statutory reporting.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gs116d\">Fees payable to the Group\u2019<span class=\"_ _2\"></span>s auditors for other services </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs116e\">Other services provided in FY2023 relate to an independent assessment of technology project governance. No amounts were payable for other services </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs116f\">in FY2022 or FY2021. </div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gs1170\">37 <span class=\"_ _47\"> </span>BHP Group Limited<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1171\">BHP Group Limited does not present unconsolidated parent company Financial Statements. Selected financial information of the BHP Group Limited </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1172\">parent company is as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1173\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs1174\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1175\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs1176\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff78 fs2 fc3 sc0 ls5 ws2 gs1177\">Income statement information for the financial year </div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs1178\">Profit after taxation for the year<span class=\"_ _26d\"> </span><span class=\"ff75\">10,924<span class=\"_ _1c\"> </span><span class=\"ff76\">22,871<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1179\">T<span class=\"_ _2a\"></span>otal comprehensive income<span class=\"_ _34e\"> </span><span class=\"ff75\">10,925<span class=\"_ _242\"> </span></span>22,868<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff78 fs2 fc3 sc0 ls5 ws2 gs117a\">Balance sheet information as at the end of the financial year<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs117b\">Current assets<span class=\"_ _273\"> </span><span class=\"ff75\">3,579<span class=\"_ _64\"> </span></span>4,778<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs117c\">T<span class=\"_ _2a\"></span>otal assets<span class=\"_ _34f\"> </span><span class=\"ff75\">39,232<span class=\"_ _242\"> </span></span>43,565<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs117d\">Current liabilities<span class=\"_ _305\"> </span><span class=\"ff75\">1,476<span class=\"_ _1ff\"> </span></span>3,176<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs117e\">T<span class=\"_ _2a\"></span>otal liabilities<span class=\"_ _350\"> </span><span class=\"ff75\">1,637<span class=\"_ _64\"> </span></span>3,517<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs117f\">Share capital<span class=\"_ _34f\"> </span><span class=\"ff75\">4,449<span class=\"_ _64\"> </span></span>4,350<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1180\">T<span class=\"_ _2\"></span>reasury shares<span class=\"_ _237\"> </span><span class=\"ff75\">(41)<span class=\"_ _10d\"> </span></span>(31)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1181\">Reserves<span class=\"_ _351\"> </span><span class=\"ff75\">165<span class=\"_ _25\"> </span></span>168<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1182\">Retained earnings<span class=\"_ _16e\"> </span><span class=\"ff75\">33,022<span class=\"_ _242\"> </span></span>35,561<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1183\">T<span class=\"_ _2a\"></span>otal equity<span class=\"_ _352\"> </span><span class=\"ff75\">37,595<span class=\"_ _242\"> </span></span>40,048<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gs1184\">Parent company guarantees<span class=\"_ _39c\"> </span></div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1185\">BHP Group Limited has guaranteed certain financing arrangements available to subsidiaries of US$5,499 million at 30 June 2023 (2022: </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1186\">US$6,980 million).<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1187\">BHP Group Limited and its wholly owned subsidiary BHP Group (UK) Ltd (formerly BHP<span class=\"_ _2\"></span> Group Plc) have severally<span class=\"_ _2\"></span>, fully and unconditionally guaranteed </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1188\">the payment of the principal and premium, if any<span class=\"_ _2\"></span>, and interest, including certain additional amounts that may be payable in respect of the notes issued </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1189\">by 100 per cent owned finance subsidiary<span class=\"_ _2\"></span>, BHP<span class=\"_ _2\"></span> Billiton Finance (USA) Ltd. BHP Group Limited and BHP Group (UK) Ltd have guaranteed the payment </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs118a\">of such amounts when they become due and payable, whether on an interest payment date, at the stated maturity of the notes, by declaration or </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs118b\">acceleration, call for redemption or otherwise. The guaranteed liabilities at 30 June 2023 amounted to US$4,234 million (2022: US$4,234 million). </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs118c\">In addition, BHP Group Limited and BHP<span class=\"_ _2\"></span> Group (UK) Ltd have severally guaranteed a Group Revolving Credit Facility of US$5,500 million (2022: </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs118d\">US$5,500 million), which remains undrawn.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs118e\">In FY2023, BHP Group Limited has severally<span class=\"_ _2a\"></span>, fully and unconditionally guaranteed the payment of principal and premium, if any<span class=\"_ _2\"></span>, and interest related to </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs118f\">US$2,750 million of US Global bonds issued by BHP Billiton Finance (USA) Ltd. In addition, BHP Group Limited has severally<span class=\"_ _2a\"></span>, fully and unconditionally </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1190\">guaranteed a US$5,000 million acquisition facility drawn in FY2023 by its wholly owned subsidiary<span class=\"_ _2\"></span>, BHP<span class=\"_ _2\"></span> Lonsdale Investments Pty Ltd.<span class=\"_ _39c\"> </span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gs1191\">38 <span class=\"_ _47\"> </span>Deed of Cross Guarantee<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1192\">BHP Group Limited together with certain wholly owned subsidiaries set out below have entered into a Deed of Cross Guarantee (Deed) dated 6 June </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1193\">2016 or have subsequently joined the Deed by way of an <span class=\"_ _2\"></span>Assumption Deed. The ef<span class=\"_ _2\"></span>fect of the Deed is that BHP Group Limited has guaranteed to pay any </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1194\">outstanding liabilities upon the winding up of any wholly owned subsidiary that is party to the Deed. Wholly owned subsidiaries that are party to the Deed </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1195\">have also given a similar guarantee in the event that BHP Group Limited or another party to the Deed is wound up. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1196\">The wholly owned subsidiaries that are identified below are relieved from the requirements to prepare and lodge audited financial statements. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1197\">The following companies are parties to the Deed and members of the Closed Group as at 30 June 2023: </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1198\">BHP (T<span class=\"_ _50\"></span>owage Services) Pty Ltd<span class=\"_ _39c\"> </span></div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gs1199\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs119a\">OS <span class=\"_ _2\"></span>ACPM Pty Ltd<span class=\"_ _39c\"> </span></div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gs119b\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs119c\">BHP Direct Reduced Iron Pty Limited <span class=\"_ _23c\"> </span>OS MCAP Pty Ltd</div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gs119d\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs119e\">BHP Iron Ore Pty Ltd</div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gs119f\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11a0\">UMAL<span class=\"_ _2\"></span> Consolidated Pty Ltd<span class=\"_ _39c\"> </span></div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gs11a1\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11a2\">BHP Minerals Pty Ltd</div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gs11a3\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11a4\">BHP Freight Pty Ltd </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11a5\">BHP W<span class=\"_ _2\"></span>AIO Pty Ltd</div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gs11a6\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11a7\">BHP Group Operations Pty Ltd<span class=\"_ _39c\"> </span></div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gs11a8\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11a9\">Pilbara Gas Pty Limited <span class=\"_ _1a6\"> </span>BHP<span class=\"_ _2\"></span> Innovation Pty Ltd </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11aa\">BHP Coal Pty Ltd</div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gs11ab\">1</div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11ac\"> <span class=\"_ _338\"> </span>BHP Lonsdale Investments Pty Ltd </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11ad\">BHP MetCoal Holdings Pty Ltd</div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gs11ae\">1</div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11af\"> <span class=\"_ _1af\"> </span>BHP Minerals Holdings Proprietary Limited</div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gs11b0\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11b1\">Broadmeadow Mine Services Pty Ltd <span class=\"_ _21f\"> </span>BHP Nickel W<span class=\"_ _2\"></span>est Pty Ltd</div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gs11b2\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11b3\">Central Queensland Services Pty Ltd <span class=\"_ _21f\"> </span>BHP Olympic Dam Corporation Pty Ltd</div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gs11b4\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11b5\">Hay Point Services Pty Limited <span class=\"_ _23a\"> </span>The Broken Hill Proprietary Company Pty Ltd</div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gs11b6\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11b7\">BHP <span class=\"_ _2\"></span>Y<span class=\"_ _2\"></span>akabindie Nickel Pty Ltd</div><div class=\"t m0 h20 ff76 fs12 fc3 sc0 ls5 ws2 gs11b8\">1<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1a ff77 fs3 fc3 sc0 ls5 ws2 gs11b9\">1 <span class=\"_ _42\"> </span>These companies are parties to the Deed and are relieved from the Corporations <span class=\"_ _2\"></span>Act 2001 requirements for preparation, audit and lodgement of financial reports and </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs11ba\">Directors\u2019 reports.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11bc\">A<span class=\"_ _2\"></span> Consolidated Statement of Comprehensive Income and Retained Earnings and Consolidated Balance Sheet, comprising BHP Group Limited and the </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs11bd\">wholly owned subsidiaries that are party to the Deed for the years ended 30 June 2023 and 30 June 2022 are as follows:<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs11be\">Consolidated Statement of Comprehensive Income and Retained Earnings<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs11bf\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs11c0\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs11c1\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs11c2\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11c3\">Revenue<span class=\"_ _353\"> </span><span class=\"ff75\">32,649<span class=\"_ _242\"> </span></span>38,159<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11c4\">Other income<span class=\"_ _231\"> </span><span class=\"ff75\">5,553<span class=\"_ _64\"> </span></span>6,077<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs11c5\">Expenses excluding net finance costs<span class=\"_ _99\"> </span><span class=\"ff75\">(21,703)<span class=\"_ _93\"> </span><span class=\"ff76\">(15,293)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs11c6\">Net finance costs<span class=\"_ _307\"> </span><span class=\"ff75\">(1,002)<span class=\"_ _e\"> </span><span class=\"ff76\">(172)<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11c7\">T<span class=\"_ _2a\"></span>otal taxation expense<span class=\"_ _2f3\"> </span><span class=\"ff75\">(3,562)<span class=\"_ _119\"> </span></span>(5,651)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff78 fs2 fc3 sc0 ls5 ws2 gs11c8\">Profit after taxation <span class=\"_ _2a9\"> </span><span class=\"ff75\">1<span class=\"_ _2\"></span>1,935<span class=\"_ _1c\"> </span><span class=\"ff76\">23,120<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11c9\">T<span class=\"_ _2a\"></span>otal other comprehensive income<span class=\"_ _354\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span></span>(3)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs11ca\">T<span class=\"_ _2\"></span>otal comprehensive income<span class=\"_ _355\"> </span>1<span class=\"_ _2\"></span>1,935<span class=\"_ _1a\"> </span><span class=\"ff76\">23,1<span class=\"_ _2\"></span>17<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs11cb\">Retained earnings at the beginning of the financial year<span class=\"_ _247\"> </span><span class=\"ff75\">40,196<span class=\"_ _1c\"> </span><span class=\"ff76\">50,277<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11cc\">Net effect on retained earnings of entities added to/removed from the Deed<span class=\"_ _300\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _61\"> </span></span>(62)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs11cd\">Profit after taxation for the year<span class=\"_ _355\"> </span><span class=\"ff75\">1<span class=\"_ _2\"></span>1,935<span class=\"_ _242\"> </span><span class=\"ff76\">23,120<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11ce\">T<span class=\"_ _2\"></span>ransfers to and from reserves<span class=\"_ _356\"> </span><span class=\"ff75\">(44)<span class=\"_ _b5\"> </span></span>(84)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11cf\">Dividends <span class=\"_ _236\"> </span><span class=\"ff75\">(13,420)<span class=\"_ _93\"> </span></span>(33,055)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff78 fs2 fc3 sc0 ls5 ws2 gs11d0\">Retained earnings at the end of the financial year<span class=\"_ _c6\"> </span><span class=\"ff75\">38,667<span class=\"_ _1c\"> </span><span class=\"ff76\">40,196<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs11d1\">Consolidated Balance Sheet<span class=\"_ _39c\"> </span></div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs11d2\">2023 <span class=\"_ _2\"></span> </div><div class=\"t m0 h41 ff75 fs3 fc3 sc0 ls5 ws2 gs11d3\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs11d4\">2022 <span class=\"_ _2\"></span> </div><div class=\"t m0 h5 ff76 fs3 fc3 sc0 ls5 ws2 gs11d5\">US$M<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs11d6\">ASSETS<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs11d7\">Current assets<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11d8\">Cash and cash equivalents<span class=\"_ _16f\"> </span><span class=\"ff75\">3<span class=\"_ _6d\"> </span></span>13<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11d9\">T<span class=\"_ _2\"></span>rade and other receivables<span class=\"_ _bf\"> </span><span class=\"ff75\">1,678<span class=\"_ _64\"> </span></span>1,527<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11da\">Loans to related parties<span class=\"_ _262\"> </span><span class=\"ff75\">6,123<span class=\"_ _64\"> </span></span>8,697<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs11db\">Other financial assets<span class=\"_ _357\"> </span><span class=\"ff75\">4<span class=\"_ _25\"> </span><span class=\"ff76\">284<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11dc\">Inventories<span class=\"_ _358\"> </span><span class=\"ff75\">2,344<span class=\"_ _64\"> </span></span>2,582<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs11dd\">Current tax assets<span class=\"_ _31a\"> </span><span class=\"ff75\">79<span class=\"_ _33d\"> </span><span class=\"ff77\">\u2013<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11de\">Other <span class=\"_ _359\"> </span><span class=\"ff75 ls49 ws4e\">11<span class=\"_ _0\"></span>3<span class=\"_ _6d\"> </span></span>75<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs11df\">T<span class=\"_ _2\"></span>otal current assets<span class=\"_ _22e\"> </span>10,344<span class=\"_ _242\"> </span><span class=\"ff76\">13,178<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs11e0\">Non-current assets<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11e1\">T<span class=\"_ _2\"></span>rade and other receivables<span class=\"_ _35a\"> </span><span class=\"ff75\">34<span class=\"_ _a\"> </span></span>43<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs11e2\">Other financial assets<span class=\"_ _2d5\"> </span><span class=\"ff75\">326<span class=\"_ _25\"> </span><span class=\"ff76\">234<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11e3\">Inventories<span class=\"_ _2f4\"> </span><span class=\"ff75\">546<span class=\"_ _6f\"> </span></span>456<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11e4\">Property<span class=\"_ _2\"></span>, plant and equipment<span class=\"_ _35b\"> </span><span class=\"ff75\">37,069<span class=\"_ _242\"> </span></span>36,199<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11e5\">Intangible assets<span class=\"_ _2d9\"> </span><span class=\"ff75\">1,140<span class=\"_ _140\"> </span></span>1,120<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11e6\">Investments in Group companies <span class=\"_ _2fa\"> </span><span class=\"ff75\">33,176<span class=\"_ _242\"> </span></span>26,800<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs11e7\">Other<span class=\"_ _1ce\"> </span><span class=\"ff75\">6<span class=\"_ _68\"> </span><span class=\"ff77\"> \u2013 </span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs11e8\">T<span class=\"_ _2\"></span>otal non-current assets<span class=\"_ _22f\"> </span>72,297<span class=\"_ _242\"> </span><span class=\"ff76\">64,852<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs11e9\">T<span class=\"_ _2\"></span>otal assets<span class=\"_ _2cf\"> </span>82,641<span class=\"_ _1c\"> </span><span class=\"ff76\">78,030<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs11ea\">LIABILITIES<span class=\"_ _39c\"> </span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs11eb\">Current liabilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11ec\">T<span class=\"_ _2\"></span>rade and other payables<span class=\"_ _35c\"> </span><span class=\"ff75\">3,574<span class=\"_ _64\"> </span></span>3,919<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11ed\">Loans from related parties<span class=\"_ _22f\"> </span><span class=\"ff75\">19,564<span class=\"_ _64\"> </span></span>9,966<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11ee\">Interest bearing liabilities<span class=\"_ _35a\"> </span><span class=\"ff75\">5,168<span class=\"_ _25\"> </span></span>213<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs11ef\">Other financial liabilities<span class=\"_ _277\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _a\"> </span><span class=\"ff76\">26<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11f0\">Current tax payable<span class=\"_ _35d\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _64\"> </span></span>1,783<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11f1\">Provisions <span class=\"_ _358\"> </span><span class=\"ff75\">1,961<span class=\"_ _8f\"> </span></span>1,61<span class=\"_ _2\"></span>1<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11f2\">Deferred income<span class=\"_ _27a\"> </span><span class=\"ff75\">4<span class=\"_ _33d\"> </span></span>8<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs11f3\">T<span class=\"_ _2\"></span>otal current liabilities<span class=\"_ _232\"> </span>30,271<span class=\"_ _242\"> </span><span class=\"ff76\">17,526<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs11f4\">Non-current liabilities<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff76 fs2 fc3 sc0 ls5 ws2 gs11f5\">T<span class=\"_ _2\"></span>rade and other payables<span class=\"_ _329\"> </span><span class=\"ff75\">5<span class=\"_ _74\"> </span><span class=\"ff77\">\u2013 </span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11f6\">Loans from related parties<span class=\"_ _127\"> </span><span class=\"ff75\">2,800<span class=\"_ _1c\"> </span></span>10,014<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11f7\">Interest bearing liabilities<span class=\"_ _2b1\"> </span><span class=\"ff75\">657<span class=\"_ _6f\"> </span></span>586<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs11f8\">Other financial liabilities<span class=\"_ _26f\"> </span><span class=\"ff75\">38<span class=\"_ _33d\"> </span></span>\u2013 </div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11f9\">Deferred tax liabilities<span class=\"_ _35e\"> </span><span class=\"ff75\">773<span class=\"_ _25\"> </span></span>874<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11fa\">Provisions<span class=\"_ _35f\"> </span><span class=\"ff75\">4,408<span class=\"_ _64\"> </span></span>3,896<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs11fb\">Deferred income<span class=\"_ _27a\"> </span><span class=\"ff75\">3<span class=\"_ _33d\"> </span></span>5<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs11fc\">T<span class=\"_ _2\"></span>otal non-current liabilities<span class=\"_ _360\"> </span>8,684<span class=\"_ _242\"> </span><span class=\"ff76\">15,375<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs11fd\">T<span class=\"_ _2\"></span>otal liabilities<span class=\"_ _235\"> </span>38,955<span class=\"_ _242\"> </span><span class=\"ff76\">32,901<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs11fe\">Net assets<span class=\"_ _236\"> </span>43,686<span class=\"_ _242\"> </span><span class=\"ff76\">45,129<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 h4 ff75 fs2 fc3 sc0 ls5 ws2 gs11ff\">EQUITY<span class=\"_ _39c\"> </span></div><div class=\"t m0 h32 ff77 fs2 fc3 sc0 ls5 ws2 gs1200\">Share capital \u2013 BHP Group Limited<span class=\"_ _169\"> </span><span class=\"ff75\">4,737<span class=\"_ _140\"> </span><span class=\"ff76\">4,638<span class=\"_ _39c\"> </span></span></span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1201\">T<span class=\"_ _2\"></span>reasury shares<span class=\"_ _237\"> </span><span class=\"ff75\">(41)<span class=\"_ _10d\"> </span></span>(31)<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1202\">Reserves<span class=\"_ _351\"> </span><span class=\"ff75\">323<span class=\"_ _25\"> </span></span>326<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff76 fs2 fc3 sc0 ls5 ws2 gs1203\">Retained earnings<span class=\"_ _16e\"> </span><span class=\"ff75\">38,667<span class=\"_ _242\"> </span></span>40,196<span class=\"_ _39c\"> </span></div><div class=\"t m0 hd ff75 fs2 fc3 sc0 ls5 ws2 gs1204\">T<span class=\"_ _2\"></span>otal equity <span class=\"_ _285\"> </span>43,686<span class=\"_ _1c\"> </span><span class=\"ff76\">45,129<span class=\"_ _39c\"> </span></span></div><div class=\"t m0 hb ff75 fs7 fc7 sc0 ls5 ws2 gs1206\">39 <span class=\"_ _47\"> </span>New and amended accounting standards and interpretations and changes to accounting policies<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gs1207\">New and amended accounting pronouncements adopted in the current year </div><div class=\"t m0 h8 ff76 fs5 fc2 sc0 ls5 ws2 gs1208\">Amendment to IAS 16/AASB 1<span class=\"_ _2\"></span>16 \u2018Property<span class=\"_ _2a\"></span>, Plant and Equipment\u2019 (IAS 16)<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1209\">On 1 July 2022, the Group adopted an amendment to IAS 16 that requires an entity to recognise the sales proceeds from selling items produced while </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs120a\">preparing property<span class=\"_ _2\"></span>, plant and equipment for its intended use, along with the costs associated with producing that revenue, in profit or loss, instead of </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs120b\">deducting the amounts received from the cost of the asset. </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs120c\">The amendment applies retrospectively to items of property<span class=\"_ _2\"></span>, plant and equipment made available for use on or after 1 July 2020. However<span class=\"_ _2\"></span>, no significant </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs120d\">impacts have been identified in respect of the years ended 30 June 2022 and 30 June 2021 and, as such, comparative period financial information has </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs120e\">not been restated.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc2 sc0 ls5 ws2 gs120f\">Amendment to IAS 12/AASB1<span class=\"_ _2\"></span>12 \u2018Income taxes\u2019<span class=\"_ _2\"></span> (IAS 12) </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1210\">At 30 June 2023, the Group has adopted amendments to IAS12 issued by the IASB and <span class=\"_ _2\"></span>AASB on 23 May 2023 and 27 June 2023, respectively<span class=\"_ _2\"></span>, in </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1211\">relation to the Organisation for Economic Co-operation and Development (OECD)/G20 Inclusive Framework on Base Erosion and Profit Shifting (BEPS) </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1212\">Pillar T<span class=\"_ _2\"></span>wo income tax. <span class=\"_ _2\"></span>The amendments introduced a temporary exception to the requirements of IAS 12 under which a company does not recognise or </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1213\">disclose information about deferred tax assets and liabilities related to the proposed Pillar T<span class=\"_ _2\"></span>wo model rules.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1214\">Refer to note 6 \u2018Income tax expense\u2019<span class=\"_ _2\"></span> for more information.<span class=\"_ _39c\"> </span></div><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gs1215\">New and amended accounting pronouncements on issue but not yet effective<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1216\">A<span class=\"_ _2\"></span> number of other accounting standards and interpretations have been issued and will be applicable in future periods. While these remain subject to </div><div class=\"t m0 h9 ff77 fs5 fc3 sc0 ls5 ws2 gs1217\">ongoing assessment, no significant impacts have been identified to date. </div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gs1218\">These pronouncements have not been applied in the preparation of these Financial Statements.</div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfNotesAndOtherExplanatoryInformationExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-608": {
   "value": "BHP Group Limited (BHP or the Company) together with its controlled ",
   "dimensions": {
    "concept": "ifrs-full:NameOfUltimateParentOfGroup",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-2": {
   "value": "BHP Group Limited",
   "dimensions": {
    "concept": "ifrs-full:NameOfParentEntity",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-610": {
   "value": "Limited",
   "dimensions": {
    "concept": "ifrs-full:LegalFormOfEntity",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-3": {
   "value": "BHP",
   "dimensions": {
    "concept": "ifrs-full:NameOfReportingEntityOrOtherMeansOfIdentification",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-609": {
   "value": "incorporated and domiciled in Australia, is a for-profit company limited by ",
   "dimensions": {
    "concept": "ifrs-full:DomicileOfEntity",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-4": {
   "value": "Australia",
   "dimensions": {
    "concept": "ifrs-full:CountryOfIncorporation",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-5": {
   "value": "Prior to 31 January 2022, BHP Group Limited and BHP Group Plc, an incorporated UK-listed company, operated together as a single-for-profit economic entity under a Dual Listed Company (DLC) structure comprising a common Board of Directors, unified management structure and joint objectives. On 31 January 2022, BHP unified its corporate structure under BHP Group Limited. ",
   "dimensions": {
    "concept": "ifrs-full:ExplanationOfChangeInNameOfReportingEntityOrOtherMeansOfIdentificationFromEndOfPrecedingReportingPeriod",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-694": {
   "value": "\u2013  Australian Accounting Standards and other authoritative pronouncements of the Australian Accounting Standards Board (AASB) and International Financial Reporting Standards as issued by the International Accounting Standards Board (IASB) (collectively referred to as IFRS) ",
   "dimensions": {
    "concept": "ifrs-full:StatementOfIFRSCompliance",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-654": {
   "value": "In assessing the appropriateness of the going concern assumption over the going concern period, management has stress tested BHP\u2019s most recent financial projections to incorporate a range of potential future outcomes by considering BHP\u2019s principal risks. The Group\u2019s financial forecasts, including downside commodity price and production scenarios, demonstrate that the Group believes that it has sufficient financial resources to meet its obligations as they fall due throughout the going concern period. As such, the Financial Statements continue to be prepared on the going concern basis. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGoingConcernExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-615": {
   "value": "Principles of consolidation In preparing the Financial Statements, the effects of all intragroup balances and transactions have been eliminated. A list of significant entities in the Group, including subsidiaries, joint arrangements and associates at 30 June 2023 is contained in note 30 \u2018Subsidiaries\u2019, note 31 \u2018Investments accounted for using the equity method\u2019 and note 32 \u2018Interests in joint operations\u2019. Subsidiaries: The Financial Statements of the Group include the consolidation of BHP Group Limited (the Company or parent entity) and its subsidiaries, being the entities controlled by the parent entity during the year (and, in prior periods, BHP Group Plc and its subsidiaries while the DLC was in effect). Control exists where the Group: \u2013  has power over the investee \u2013  is exposed to, or has rights to, variable returns from its involvement with the entity \u2013  has the ability to affect those returns through its power to direct the activities of the entity The ability to approve the operating and capital budget of an entity and the ability to appoint key management personnel are decisions that demonstrate that the Group has the existing rights to direct the relevant activities of an entity. The results of subsidiaries acquired or disposed of during the year are included in profit or loss from the date the Company gains control until the date when the Company ceases to control the subsidiary. When the Group loses control of a subsidiary, the gain or loss on disposal is recognised in profit or loss. Where the Group\u2019s interest is less than 100 per cent, the interest attributable to outside shareholders is reflected in non-controlling interests. Changes in the Group\u2019s interests in subsidiaries that do not result in a loss of control are accounted for as equity transactions. The carrying amount of the Group\u2019s interests and the non-controlling interests are adjusted to reflect the changes in their relative interests in the subsidiaries. Any difference between the amount by which the non-controlling interests are adjusted and the fair value of the consideration paid or received is recognised directly in equity and attributed to the owners of the Company. The financial information of subsidiaries is prepared for the same reporting period as the Group. The acquisition method of accounting is used to account for the Group\u2019s business combinations. Joint arrangements: The Group undertakes a number of business activities through joint arrangements, which exist when two or more parties have joint control. Joint arrangements are classified as either joint operations or joint ventures, based on the contractual rights and obligations between the parties to the arrangement: \u2013  Joint operations: A joint operation is an arrangement in which the Group shares joint control, primarily via contractual arrangements with other parties. In a joint operation, the Group has rights to the underlying assets and obligations for the liabilities relating to the arrangement. This includes situations where the parties benefit from the joint activity through a share of the output, rather than by receiving a share of the results of trading. In relation to the Group\u2019s interest in a joint operation, the Group recognises: its assets and liabilities, including its share of any assets and liabilities held or incurred jointly; revenue from the sale of its share of the output and its share of any revenue generated from the sale of the output by the joint operation; and its expenses including its share of expenses incurred jointly. All such amounts are allocated in accordance with the terms of the arrangement, which is usually in proportion to the Group\u2019s interest in the joint operation. The Group accounts for the assets, liabilities, revenue and expenses relating to its interest in a joint operation in accordance with the IFRS Standards applicable to the particular assets, liabilities, revenue and expenses. \u2013  Joint ventures: A joint venture is a joint arrangement in which the parties that share joint control have rights to the net assets of the arrangement. A separate vehicle, not the parties, will have the rights to the assets and obligations for the liabilities relating to the arrangement. More than an insignificant share of output from a joint venture is sold to third parties, which indicates the joint venture is not dependent on the parties to the arrangement for funding, nor do the parties have an obligation for the liabilities of the arrangement. Joint ventures are accounted for using the equity method as outlined below. Associates: The Group accounts for investments in associates using the equity method as outlined below. An entity is considered an associate where the Group is deemed to have significant influence but not control or joint control. Significant influence is presumed to exist where the Group: \u2013  has over 20 per cent but less than 50 per cent of the voting rights of an entity, unless it can be clearly demonstrated that this is not the case or \u2013  holds less than 20 per cent of the voting rights of an entity; however, has the power to participate in the financial and operating policy decisions affecting the entity The Group uses the term \u2018equity accounted investments\u2019 to refer to joint ventures and associates collectively. Under the equity method, an investment in an associate or a joint venture is recognised initially at cost and adjusted thereafter to recognise the Group\u2019s share of the profit or loss and other comprehensive income of the associate or joint venture. When the Group\u2019s share of losses of an associate or a joint venture exceeds the Group\u2019s interest in that associate or joint venture, the Group discontinues recognising its share of further losses. Additional losses are recognised only to the extent that the Group has incurred legal or constructive obligations or made payments on behalf of the associate or joint venture. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBasisOfConsolidationExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-727": {
   "value": "Subsidiaries: The Financial Statements of the Group include the consolidation of BHP Group Limited (the Company or parent entity) and its subsidiaries, being the entities controlled by the parent entity during the year (and, in prior periods, BHP Group Plc and its subsidiaries while the DLC was in effect). Control exists where the Group: \u2013  has power over the investee \u2013  is exposed to, or has rights to, variable returns from its involvement with the entity \u2013  has the ability to affect those returns through its power to direct the activities of the entity The ability to approve the operating and capital budget of an entity and the ability to appoint key management personnel are decisions that demonstrate that the Group has the existing rights to direct the relevant activities of an entity. The results of subsidiaries acquired or disposed of during the year are included in profit or loss from the date the Company gains control until the date when the Company ceases to control the subsidiary. When the Group loses control of a subsidiary, the gain or loss on disposal is recognised in profit or loss. Where the Group\u2019s interest is less than 100 per cent, the interest attributable to outside shareholders is reflected in non-controlling interests. Changes in the Group\u2019s interests in subsidiaries that do not result in a loss of control are accounted for as equity transactions. The carrying amount of the Group\u2019s interests and the non-controlling interests are adjusted to reflect the changes in their relative interests in the subsidiaries. Any difference between the amount by which the non-controlling interests are adjusted and the fair value of the consideration paid or received is recognised directly in equity and attributed to the owners of the Company. The financial information of subsidiaries is prepared for the same reporting period as the Group. The acquisition method of accounting is used to account for the Group\u2019s business combinations. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForSubsidiariesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-728": {
   "value": "Joint arrangements: The Group undertakes a number of business activities through joint arrangements, which exist when two or more parties have joint control. Joint arrangements are classified as either joint operations or joint ventures, based on the contractual rights and obligations between the parties to the arrangement: \u2013  Joint operations: A joint operation is an arrangement in which the Group shares joint control, primarily via contractual arrangements with other parties. In a joint operation, the Group has rights to the underlying assets and obligations for the liabilities relating to the arrangement. This includes situations where the parties benefit from the joint activity through a share of the output, rather than by receiving a share of the results of trading. In relation to the Group\u2019s interest in a joint operation, the Group recognises: its assets and liabilities, including its share of any assets and liabilities held or incurred jointly; revenue from the sale of its share of the output and its share of any revenue generated from the sale of the output by the joint operation; and its expenses including its share of expenses incurred jointly. All such amounts are allocated in accordance with the terms of the arrangement, which is usually in proportion to the Group\u2019s interest in the joint operation. The Group accounts for the assets, liabilities, revenue and expenses relating to its interest in a joint operation in accordance with the IFRS Standards applicable to the particular assets, liabilities, revenue and expenses. \u2013  Joint ventures: A joint venture is a joint arrangement in which the parties that share joint control have rights to the net assets of the arrangement. A separate vehicle, not the parties, will have the rights to the assets and obligations for the liabilities relating to the arrangement. More than an insignificant share of output from a joint venture is sold to third parties, which indicates the joint venture is not dependent on the parties to the arrangement for funding, nor do the parties have an obligation for the liabilities of the arrangement. Joint ventures are accounted for using the equity method as outlined below. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForInvestmentsInJointVentures",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-756": {
   "value": "Joint arrangements: The Group undertakes a number of business activities through joint arrangements, which exist when two or more parties have joint control. Joint arrangements are classified as either joint operations or joint ventures, based on the contractual rights and obligations between the parties to the arrangement: \u2013  Joint operations: A joint operation is an arrangement in which the Group shares joint control, primarily via contractual arrangements with other parties. In a joint operation, the Group has rights to the underlying assets and obligations for the liabilities relating to the arrangement. This includes situations where the parties benefit from the joint activity through a share of the output, rather than by receiving a share of the results of trading. In relation to the Group\u2019s interest in a joint operation, the Group recognises: its assets and liabilities, including its share of any assets and liabilities held or incurred jointly; revenue from the sale of its share of the output and its share of any revenue generated from the sale of the output by the joint operation; and its expenses including its share of expenses incurred jointly. All such amounts are allocated in accordance with the terms of the arrangement, which is usually in proportion to the Group\u2019s interest in the joint operation. The Group accounts for the assets, liabilities, revenue and expenses relating to its interest in a joint operation in accordance with the IFRS Standards applicable to the particular assets, liabilities, revenue and expenses. \u2013  Joint ventures: A joint venture is a joint arrangement in which the parties that share joint control have rights to the net assets of the arrangement. A separate vehicle, not the parties, will have the rights to the assets and obligations for the liabilities relating to the arrangement. More than an insignificant share of output from a joint venture is sold to third parties, which indicates the joint venture is not dependent on the parties to the arrangement for funding, nor do the parties have an obligation for the liabilities of the arrangement. Joint ventures are accounted for using the equity method as outlined below. Associates: The Group accounts for investments in associates using the equity method as outlined below. An entity is considered an associate where the Group is deemed to have significant influence but not control or joint control. Significant influence is presumed to exist where the Group: \u2013  has over 20 per cent but less than 50 per cent of the voting rights of an entity, unless it can be clearly demonstrated that this is not the case or \u2013  holds less than 20 per cent of the voting rights of an entity; however, has the power to participate in the financial and operating policy decisions affecting the entity The Group uses the term \u2018equity accounted investments\u2019 to refer to joint ventures and associates collectively. Under the equity method, an investment in an associate or a joint venture is recognised initially at cost and adjusted thereafter to recognise the Group\u2019s share of the profit or loss and other comprehensive income of the associate or joint venture. When the Group\u2019s share of losses of an associate or a joint venture exceeds the Group\u2019s interest in that associate or joint venture, the Group discontinues recognising its share of further losses. Additional losses are recognised only to the extent that the Group has incurred legal or constructive obligations or made payments on behalf of the associate or joint venture. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForInvestmentInAssociatesAndJointVenturesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-729": {
   "value": "Associates: The Group accounts for investments in associates using the equity method as outlined below. An entity is considered an associate where the Group is deemed to have significant influence but not control or joint control. Significant influence is presumed to exist where the Group: \u2013  has over 20 per cent but less than 50 per cent of the voting rights of an entity, unless it can be clearly demonstrated that this is not the case or \u2013  holds less than 20 per cent of the voting rights of an entity; however, has the power to participate in the financial and operating policy decisions affecting the entity ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForInvestmentInAssociates",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-616": {
   "value": "Foreign currencies Transactions related to the Group\u2019s worldwide operations are conducted in a number of foreign currencies. The majority of the subsidiaries, joint arrangements and associates within each of the operations have assessed US dollars as the functional currency, however, some subsidiaries, joint arrangements and associates have functional currencies other than US dollars. Transactions and monetary items denominated in foreign currencies are translated into US dollars as follows: Foreign currency item Applicable exchange rate Transactions Date of underlying transaction Monetary assets and liabilities Period-end rate Foreign exchange gains and losses resulting from translation are recognised in the income statement, except for qualifying cash flow hedges (which are deferred to equity) and foreign exchange gains or losses on foreign currency provisions for site closure and rehabilitation costs (which are capitalised in property, plant and equipment for operating sites). On consolidation, the assets, liabilities, income and expenses of foreign operations with non-US dollar functional currencies are translated into US dollars using the following applicable exchange rates: Foreign currency amount Applicable exchange rate Income and expenses Date of underlying transaction Assets and liabilities Period-end rate Equity Historical rate Reserves Historical rate Foreign exchange differences resulting from translation are initially recognised in the foreign currency translation reserve and subsequently transferred to the income statement on disposal of a foreign operation. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForForeignCurrencyTranslationExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-656": {
   "value": "The majority of the subsidiaries, joint arrangements and associates within each of the operations have assessed US dollars as the functional currency, however, some subsidiaries, joint arrangements and associates have functional currencies other than US dollars. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFunctionalCurrencyExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-613": {
   "value": "Significant accounting policies, judgements and estimates The Group\u2019s accounting policies require the use of judgement, estimates and assumptions. All judgements, estimates and assumptions are based on the most current facts and circumstances and are reassessed on an ongoing basis. Actual results in future reporting periods may differ for these estimates under different assumptions and conditions. Further information regarding the Group\u2019s significant judgements and key estimates and assumptions, being those where changes may materially affect financial results and the carrying amount of assets and liabilities to be reported in the next reporting period, are embedded within the following notes: Note 4  Significant events \u2013 Samarco dam failure 6  Taxation 11 Overburden removal costs 11 Depreciation of property, plant and equipment 13 Impairment of non-current assets 15 Closure and rehabilitation provisions 22 Leases 29  Business combinations Additional information including sensitivity analysis, where appropriate, has been provided in the relevant notes to enhance an understanding of the impact of key estimates and assumptions on the Group\u2019s financial position and performance. Reserve estimates Reserves are estimates of the amount of product that can be demonstrated to be able to be economically and legally extracted from the Group\u2019s properties. In order to estimate reserves, assumptions are required about a range of technical and economic factors, including quantities, qualities, production techniques, recovery efficiency, production and transport costs, commodity supply and demand, commodity and carbon prices and exchange rates. Estimating the quantity and/or quality of reserves requires the size, shape and depth of ore bodies to be determined by analysing geological data, such as drilling samples and geophysical survey interpretations. Economic assumptions used to estimate reserves change from period- to-period as additional technical and operational data is generated. This process may require complex and difficult geological judgements to interpret the data. Reserve impact on financial reporting Estimates of reserves may change from period-to-period as the economic assumptions used to estimate reserves change and additional geological data is generated during the course of operations. Changes in reserves may affect the Group\u2019s financial results and financial position in a number of ways, including: \u2013  asset carrying values may be affected due to changes in estimated future production levels \u2013  depreciation, depletion and amortisation charged to the income statement may change where such charges are determined on the units of production basis, or where the useful economic lives of assets change \u2013  overburden removal costs recorded on the balance sheet or charged to the income statement may change due to changes in stripping ratios or the units of production basis of depreciation \u2013  closure and rehabilitation provisions may change where changes in estimated reserves affect expectations about the timing or cost of these activities \u2013  the carrying amount of deferred tax assets may change due to changes in estimates of the likely recovery of the tax benefits Key judgements and estimates Judgements: The outcomes of litigation are inherently difficult to predict and significant judgement has been applied in assessing the likely outcome of legal claims and determining which legal claims require recognition of a provision or disclosure of a contingent liability. The facts and circumstances relating to these cases are regularly evaluated in determining whether a provision for any specific claim is required. Management has determined that a provision can only be recognised for obligations under the Framework Agreement as at 30 June 2023. It is not yet possible to provide a range of possible outcomes or a reliable estimate of potential future exposures to BHP in connection to the contingent liabilities noted above, given their status. Estimates: The provision for the Samarco dam failure reflects the Group\u2019s estimate of the remaining costs to complete Programs under the Framework Agreement and requires the use of significant judgements, estimates and assumptions. Based on current estimates, it is expected that approximately 85 per cent of remaining costs for Programs under the Framework Agreement will be incurred by June 2025, largely attributable to the finalisation of the resettlement program and closure of the Novel system (application system for impacted individuals to lodge compensation claims). While the provision has been measured based on the latest information available as at 30 June 2023, changes in facts and circumstances are likely in future reporting periods and may lead to material revisions to these estimates. However, it is currently not possible to determine what facts and circumstances may change, therefore revisions in future reporting periods due to the key estimates and factors outlined below cannot be reliably measured. The key estimates that may have a material impact upon the provision in the next and future reporting periods include the: \u2013  number of people eligible for financial assistance and compensation and the corresponding amount of expected compensation; and \u2013  costs to complete key infrastructure programs. The provision may also be affected by factors including but not limited to: \u2013  potential changes in scope of work and funding amounts required under the Framework Agreement including the impact of further technical analysis, community participation required under the Governance Agreement and rulings made by the Federal Court; \u2013  the outcome of ongoing negotiations with State and Federal Prosecutors, including review of Funda\u00e7\u00e3o Renova\u2019s Programs as provided in the Governance Agreement; \u2013  actual costs incurred; \u2013  updates to discount and foreign exchange rates; and \u2013  the outcomes of Samarco\u2019s judicial reorganisation and resolution of uncertainty in respect of the nature and extent of Samarco\u2019s long-term cash generation. In addition, the provision may be impacted by decisions in, or resolution of, existing and potential legal claims in Brazil and other jurisdictions, including the outcome of the United Kingdom group action and the negotiations seeking a definitive and substantive settlement of the obligations under the Framework Agreement and the R$155 billion (approximately US$32 billion) Federal Public Prosecution Office claim. Outcomes of the negotiations are highly uncertain and it is therefore not possible to provide a reliable estimate of potential outcomes. Given these factors, future actual cash outflows may differ from the amounts currently provided and changes to any of the key assumptions and estimates outlined above could result in a material impact to the provision in the next and future reporting periods. Key judgements and estimates Income tax classification Judgements: The Group\u2019s accounting policy for taxation, including royalty-related taxation, requires management\u2019s judgement as to the types of arrangements considered to be a tax on income in contrast to an operating cost. Deferred tax Judgements: Judgement is required in: \u2013   determining the amount of deferred tax assets to be recognised based on the likely timing and the level of future taxable profits; \u2013   assessing whether changes in tax regimes or applicable tax rates are substantively enacted at the reporting date; \u2013   recognising deferred tax liabilities arising from temporary differences in investments. These deferred tax liabilities caused principally by retained earnings held in foreign tax jurisdictions are recognised unless repatriation of retained earnings can be controlled and is not expected to occur in the foreseeable future. In FY2023, judgement was applied in determining the Chilean Royalty Bill was substantively enacted at the reporting date. It was considered that the process of enactment was complete and the remaining steps for enactment would not change the outcome of the tax rates to be applied in measuring the deferred tax assets and liabilities. Estimates: The Group assesses the recoverability of recognised and unrecognised deferred taxes, including losses in Australia, the United States and Canada on a consistent basis. Estimates and assumptions relating to projected earnings and cash flows as applied in the Group impairment process are used for operating assets. These forecasts are also used to estimate the royalty related tax rates to apply when the deferred tax assets are realised and deferred tax liabilities are settled, in revaluing the deferred tax balances following the substantive enactment of the Chilean Royalty Bill. Key judgements and estimates Judgements: Judgement is applied by management in determining the components of an ore body. Estimates: Estimates are used in the determination of stripping ratios and mineral reserves by component. Changes to estimates related to life- of-component waste-to-ore (or mineral contained) strip ratios and the expected ore production from identified components are accounted for prospectively and may affect depreciation rates and asset carrying values. Key estimates The determination of useful lives, residual values and depreciation methods involves estimates and assumptions and is reviewed annually. Any changes to useful lives or any other estimates or assumptions, including the expected impact of climate change and the transition to a lower carbon economy, may affect prospective depreciation rates and asset carrying values. The table below summarises the principal depreciation methods and rates applied to major asset categories by the Group. Category Buildings Plant and equipment Mineral rights Capitalised exploration, evaluation and development expenditure Typical depreciation methodology SL SL UoP UoP Depreciation rate 25-50 years 3-30 years Based on the rate of  depletion of reserves Based on the rate of  depletion of reserves Key judgements and estimates Judgements: Assessment of indicators of impairment or impairment reversal and the determination of CGUs for impairment purposes require significant management judgement. Indicators of impairment may include changes in the Group\u2019s operating and economic assumptions, including those arising from changes in reserves or mine planning, updates to the Group\u2019s commodity supply, demand and price forecasts, or the possible additional impacts from emerging risks including those related to climate change and the transition to a low-carbon economy. Climate change The Group\u2019s impairment assessments may be impacted by climate change and the transition to a low-carbon economy. Further detail is provided in note 16 \u2018Climate Change\u2019. Estimates: The Group performs a recoverable amount determination for an asset or CGU when there is an indication of impairment or impairment reversal. When the recoverable amount is measured by reference to FVLCD, in the absence of quoted market prices or binding sale agreement, estimates are made regarding the present value of future post-tax cash flows. These estimates are made from the perspective of a market participant and include prices, future production volumes, operating costs, capital expenditure, closure and rehabilitation costs, taxes, risking factors applied to cash flows and discount rates. The cash flow forecasts may include net cash flows expected from the extraction, processing and sale of material that does not currently qualify for inclusion in ore reserves. Reserves and resources are included in the assessment of FVLCD to the extent that it is considered probable that a market participant would attribute value to them. When recoverable amount is measured using VIU, estimates are made regarding the present value of future cash flows based on internal budgets and forecasts and life of asset plans. Key estimates are similar to those identified for FVLCD, although some assumptions and values may differ as they reflect the perspective of management rather than a market participant. All estimates require judgements and assumptions and are subject to risk and uncertainty that may be beyond the control of the Group; hence, there is a possibility that changes in circumstances will materially alter projections, which may impact the recoverable amount of an asset or CGU at each reporting date. While no indicators of impairment, or impairment reversal, were identified across the Group\u2019s CGUs at 30 June 2023, the carrying value of the Spence and Nickel West CGUs are the most susceptible to changes in the significant estimates outlined below in the next reporting period. The significant estimates impacting the Group\u2019s recoverable amount determinations are: Commodity prices Commodity prices were based on latest internal forecasts which assume short-term market prices will revert to the Group\u2019s assessment of long-term price. These price forecasts reflect management\u2019s long-term views of global supply and demand, built upon past experience of the commodity markets and are benchmarked with external sources of information such as analyst forecasts. Prices are adjusted based upon premiums or discounts applied to global price markers to reflect the location, nature and quality of the Group\u2019s production, or to take into account contracted prices. Future production volumes Estimated production volumes were based on detailed data and took into account development plans established by management as part of the Group\u2019s long-term planning process. When estimating FVLCD, assumptions reflect all reserves and resources that a market participant would consider when valuing the respective CGU, which in some cases are broader in scope than the reserves that would be used in a VIU test. In determining FVLCD, risk factors may be applied to reserves and resources which do not meet the criteria to be treated as proved. Cash outflows (including operating costs, capital expenditure, closure and rehabilitation costs and taxes) Cash outflows are based on internal budgets and forecasts and life of asset plans. Cost assumptions reflect management experience and expectations. Tax assumptions reflect existing and substantively enacted tax and royalty regimes and rates applicable in the jurisdiction of the CGU. In the case of FVLCD, cash flow projections include the anticipated cash flow effects of any capital expenditure to enhance production or reduce cost where a market participant may take a consistent view. VIU does not take into account future development. Discount rates The Group uses real post-tax discount rates applied to real post-tax cash flows. The discount rates are derived using the weighted average cost of capital methodology. Adjustments to the rates are made for any risks that are not reflected in the underlying cash flows, including country risk. Key estimates Closure cost estimates are generally based on conceptual level studies early in the operating life of an asset with more detailed studies and planning performed as closure risks (including those related to climate change) are identified and/or as an asset, or parts thereof, near closure. As such, the recognition and measurement of closure and rehabilitation provisions requires the use of significant estimates and assumptions, including, but not limited to: \u2013  the extent (due to legal or constructive obligations) of potential activities required for the removal of infrastructure, decharacterisation of tailings storage facilities and rehabilitation activities \u2013  costs associated with future closure activities \u2013  the extent and period of post-closure monitoring and maintenance, including water management \u2013  applicable discount rates \u2013  the timing of cash flows and ultimate closure of operations The extent, cost and timing of future closure activities may also be impacted by the potential physical impacts of climate change and the transition to a low-carbon economy. Further detail is provided in note 16 \u2018Climate Change\u2019. Estimates for post-closure monitoring and maintenance reflect the Group\u2019s strategies for individual sites, which may include possible relinquishment. The period of monitoring and maintenance included in the provision requires judgement and considers regulatory and licencing requirements, the outcomes of studies and management\u2019s current assessment of stakeholder expectations. While progressive closure is performed across a number of operations, significant activities are generally undertaken at the end of the production life at the individual sites, the estimated timing of which is informed by the Group\u2019s current assumptions relating to demand for commodities and carbon pricing, and their impact on the Group\u2019s long-term price forecasts. Approximately 51 per cent (2022: 48 per cent) of the Group\u2019s total undiscounted forecast cashflows are expected to be incurred after more than 30 years, reflecting the long-lived nature of many of the Group\u2019s operations which have remaining production lives ranging from 1-103 years (2022: 2-104 years). The discount rates applied to the Group\u2019s closure and rehabilitation provisions are determined by reference to the currency of the closure cash flows, the period over which the cash flows will be incurred and prevailing market interest rates (where available). The Group continues to monitor current market conditions with no change made to the Group\u2019s discount rates in the current year. While the closure and rehabilitation provisions reflect management\u2019s best estimates based on current knowledge and information, further studies, trials and detailed analysis of relevant knowledge and resultant closure activities for individual assets continue to be performed throughout the life of asset. Such studies and analysis can impact the estimated costs of closure activities. Estimates can also be impacted by the emergence of new closure and rehabilitation techniques, changes in regulatory requirements and stakeholder expectations for closure (including costs associated with equitable transition), development of new technologies, risks relating to climate change and the transition to a low-carbon economy, and experience at other operations. These uncertainties may result in future actual expenditure differing from the amounts currently provided for in the balance sheet. Sensitivity A 0.5 per cent increase in the discount rates applied at 30 June 2023 would result in a decrease to the closure and rehabilitation provision of approximately US$758 million, a decrease in property, plant and equipment of approximately US$568 million in relation to operating sites and an income statement credit of approximately US$190 million in respect of closed sites. In addition, the change would result in a decrease of approximately US$44 million to depreciation expense and a US$26 million increment in net finance costs for the year ending 30 June 2024. Given the long-lived nature of the majority of the Group\u2019s assets, the majority of final closure activities are generally not expected to occur for a significant period of time. However, a one-year acceleration in forecast cash flows of the Group\u2019s closure and rehabilitation provisions, in isolation, would result in an increase to the provision of approximately US$209 million, an increase in property, plant and equipment of US$148 million in relation to operating sites and an income statement charge of US$61 million in respect of closed sites.  Key judgements and estimates Judgements: Certain contractual arrangements not in the form of a lease require the Group to apply significant judgement in evaluating whether the Group controls the right to direct the use of assets and therefore whether the contract contains a lease. Management considers all facts and circumstances in determining whether the Group or the supplier has the rights to direct how, and for what purpose, the underlying assets are used in certain mining contracts and other arrangements, including outsourcing and shipping arrangements. Judgement is used to assess which decision-making rights mostly affect the benefits of use of the assets for each arrangement. Where a contract includes the provision of non-lease services, judgement is required to identify the lease and non-lease components. Estimates: Where the Group cannot readily determine the interest rate implicit in the lease, estimation is involved in the determination of the weighted average incremental borrowing rate to measure lease liabilities. The incremental borrowing rate reflects the rates of interest a lessee would have to pay to borrow over a similar term, with similar security, the funds necessary to obtain an asset of similar value to the right-of-use asset in a similar economic environment. Under the Group\u2019s portfolio approach to debt management, the Group does not specifically borrow for asset purchases. Therefore, the incremental borrowing rate is estimated referencing the Group\u2019s corporate borrowing portfolio and other similar rated entities, adjusted to reflect the terms and conditions of the lease (including the impact of currency, credit rating of subsidiary entering into the lease and the term of the lease), at the inception of the lease arrangement or the time of lease modification. The Group estimates stand-alone prices, where such prices are not readily observable, in order to allocate the contractual payments between lease and non-lease components. Key judgements and estimates Judgements: Judgement is required to determine the fair value of assets acquired and liabilities assumed at acquisition date in a business combination, which could have a material impact on goodwill. Estimates: The Group used the discounted cash-flow method to measure the fair value of mineral rights. Key assumptions used included commodity prices, production volumes, life of mine, cash outflows (including operating costs, capital expenditure, closure and rehabilitation costs and taxes), discount rates and risking factors. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAccountingJudgementsAndEstimatesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-730": {
   "value": "Reserve estimates Reserves are estimates of the amount of product that can be demonstrated to be able to be economically and legally extracted from the Group\u2019s properties. In order to estimate reserves, assumptions are required about a range of technical and economic factors, including quantities, qualities, production techniques, recovery efficiency, production and transport costs, commodity supply and demand, commodity and carbon prices and exchange rates. Estimating the quantity and/or quality of reserves requires the size, shape and depth of ore bodies to be determined by analysing geological data, such as drilling samples and geophysical survey interpretations. Economic assumptions used to estimate reserves change from period- to-period as additional technical and operational data is generated. This process may require complex and difficult geological judgements to interpret the data. Reserve impact on financial reporting Estimates of reserves may change from period-to-period as the economic assumptions used to estimate reserves change and additional geological data is generated during the course of operations. Changes in reserves may affect the Group\u2019s financial results and financial position in a number of ways, including: \u2013  asset carrying values may be affected due to changes in estimated future production levels \u2013  depreciation, depletion and amortisation charged to the income statement may change where such charges are determined on the units of production basis, or where the useful economic lives of assets change \u2013  overburden removal costs recorded on the balance sheet or charged to the income statement may change due to changes in stripping ratios or the units of production basis of depreciation \u2013  closure and rehabilitation provisions may change where changes in estimated reserves affect expectations about the timing or cost of these activities \u2013  the carrying amount of deferred tax assets may change due to changes in estimates of the likely recovery of the tax benefits ",
   "dimensions": {
    "concept": "bhp:DescriptionOfAccountingPolicyForMineralReserve",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-617": {
   "value": "1  Segment reporting Reportable segments The Group operated three reportable segments during FY2023, which are aligned with the commodities that are extracted and marketed and reflect the structure used by the Group\u2019s management to assess the performance of the Group. Reportable segment Principal activities Copper  Mining of copper, silver, zinc, molybdenum, uranium and gold Iron Ore Mining of iron ore Coal Mining of metallurgical coal and energy coal Group and unallocated items includes functions, other unallocated operations including Potash, Nickel West, West Musgrave, legacy assets and consolidation adjustments. Revenue not attributable to reportable segments comprises the sale of freight and fuel to third parties, as well as revenues from unallocated operations. Exploration and technology activities are recognised within relevant segments. Year ended 30 June 2023  US$M Copper Iron Ore Coal Group and unallocated items/ eliminations Group total Revenue 16,027 24,812 10,958 2,020 53,817 Inter-segment revenue \u2013 \u2013 \u2013 \u2013 \u2013 Total revenue 16,027 24,812 10,958 2,020 53,817 Underlying EBITDA 6,653 16,692 4,998 (387) 27,956 Depreciation and amortisation (1,810) (1,993) (697) (561) (5,061) Impairment losses 1 (33) (28) (6) (8) (75) Underlying EBIT 4,810 14,671 4,295 (956) 22,820 Exceptional items 2 471 (295) \u2013 (64) 112 Net finance costs (1,531) Profit before taxation 21,401 Capital expenditure (cash basis) 2,698 1,966 657 1,412 6,733 Profit/(loss) from equity accounted investments, related impairments and expenses 854 (256) \u2013 (4) 594 Investments accounted for using the equity method 1,530 \u2013 \u2013 90 1,620 Total assets 40,366 25,025 11,087 24,818 101,296 Total liabilities 5,824 8,382 3,821 34,739 52,766 Year ended 30 June 2022 US$M  Copper Iron Ore Coal Group and unallocated items/ eliminations Group total Revenue 16,849 30,767 15,549 1,933 65,098 Inter-segment revenue  \u2212  \u2212  \u2212  \u2212  \u2212 Total revenue 16,849 30,767 15,549 1,933 65,098 Underlying EBITDA 8,565 21,707 9,504 858 40,634 Depreciation and amortisation (1,765) (2,203) (762) (953) (5,683) Impairment losses 1 (470) (33) (9) (3) (515) Underlying EBIT 6,330 19,471 8,733 (98) 34,436 Exceptional items 2 (81) (648) 849 (450) (330) Net finance costs (969) Profit before taxation 33,137 Capital expenditure (cash basis) 2,528 1,848 621 858 5,855 Profit/(loss) from equity accounted investments,  related impairments and expenses 577 (595)  \u2212 (1) (19) Investments accounted for using the equity method 1,415  \u2212  \u2212 5 1,420 Total assets 32,762 24,613 11,524 26,267 95,166 Total liabilities 5,342 7,790 3,874 29,394 46,400 Year ended 30 June 2021 US$M Copper Iron Ore Coal Group and unallocated items/ eliminations Group total Revenue 15,726 34,475 5,154 1,566 56,921 Inter-segment revenue  \u2212  \u2212  \u2212  \u2212  \u2212 Total revenue 15,726 34,475 5,154 1,566 56,921 Underlying EBITDA 8,489 26,278 288 18 35,073 Depreciation and amortisation (1,608) (1,971) (845) (660) (5,084) Impairment losses1 (72) (13) (20) (31) (136) Underlying EBIT 6,809 24,294 (577) (673) 29,853 Exceptional items2 (144) (1,319) (1,567) (1,308) (4,338) Net finance costs (1,223) Profit before taxation 24,292 Capital expenditure (cash basis) 2,180 2,188 579 665 5,612 Profit/(loss) from equity accounted investments, related impairments and expenses 692 (1,126) (480) (1) (915) Investments accounted for using the equity method 1,482  \u2212  \u2212 260 1,742 Total assets3 31,517 26,171 11,030 40,209 108,927 Total liabilities3 4,589 7,508 3,518 37,707 53,322 1  Impairment losses exclude exceptional items of US$ nil (2022: US$ nil; 2021: US$2,371 million). 2  Exceptional items reported in Copper and Group and unallocated include fair value changes on Samarco related forward exchange derivatives of US$471 million (2022: US$(81) million; 2021: US$136 million), Samarco dam failure costs of US$(64) million (2022: US$(13) million; 2021: US$(14) million), and Samarco related other income of US$ nil (2022: US$ nil ; 2021: US$34 million). Refer to note 3 \u2018Exceptional items\u2019 for further information. 3  Group and unallocated FY2021 total assets and total liabilities include Petroleum assets and liabilities that were disclosed as part of the Petroleum segment before the merger of the Group\u2019s oil and gas portfolio with Woodside Energy Group Ltd (\u2018Woodside\u2019) in FY2022. Geographical information Revenue by location of customer 2023  US$M 2022  US$M 2021  US$M Australia 1,702 1,649 1,871 Europe 1,961 2,129 886 China 31,205 36,618 39,653 Japan 6,971 8,401 4,387 India 3,447 5,215 2,189 South Korea 2,997 4,786 3,420 Rest of Asia 3,583 4,303 2,934 North America 1,382 1,282 1,147 South America 569 715 426 Rest of world \u2013  \u2212 8 53,817 65,098 56,921 Non-current assets by location of assets 2023  US$M 2022  US$M 2021  US$M Australia 51,961 43,250 48,612 North America 5,081 3,964 9,701 South America 19,047 18,280 18,548 Rest of world 685 150 1,851 Unallocated assets1 1,171 858 3,522 77,945 66,502 82,234 1  Unallocated assets comprise deferred tax assets and other financial assets. Underlying EBITDA Underlying EBITDA is earnings before net finance costs, depreciation, amortisation and impairments, taxation expense, Discontinued operations and any exceptional items. Underlying EBITDA includes BHP\u2019s share of profit/(loss) from investments accounted for using the equity method including net finance costs, depreciation, amortisation and impairments and taxation expense/(benefit). Exceptional items are excluded from Underlying EBITDA in order to enhance the comparability of such measures from period-to-period and provide investors with further clarity in order to assess the performance of the Group\u2019s operations. Management monitors exceptional items separately. Refer to note 3 \u2018Exceptional items\u2019 for additional detail. Segment assets and liabilities Total segment assets and liabilities of reportable segments represents operating assets and operating liabilities, including the carrying amount of equity accounted investments and predominantly excludes cash balances, loans to associates, interest bearing liabilities and deferred tax balances. The carrying value of investments accounted for using the equity method represents the balance of the Group\u2019s investment in equity accounted investments, with no adjustment for any cash balances, interest bearing liabilities or deferred tax balances of the equity accounted investment. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEntitysReportableSegmentsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-657": {
   "value": "Geographical information Revenue by location of customer 2023  US$M 2022  US$M 2021  US$M Australia 1,702 1,649 1,871 Europe 1,961 2,129 886 China 31,205 36,618 39,653 Japan 6,971 8,401 4,387 India 3,447 5,215 2,189 South Korea 2,997 4,786 3,420 Rest of Asia 3,583 4,303 2,934 North America 1,382 1,282 1,147 South America 569 715 426 Rest of world \u2013  \u2212 8 53,817 65,098 56,921 Non-current assets by location of assets 2023  US$M 2022  US$M 2021  US$M Australia 51,961 43,250 48,612 North America 5,081 3,964 9,701 South America 19,047 18,280 18,548 Rest of world 685 150 1,851 Unallocated assets1 1,171 858 3,522 77,945 66,502 82,234 1  Unallocated assets comprise deferred tax assets and other financial assets. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGeographicalAreasExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-731": {
   "value": "Underlying EBITDA Underlying EBITDA is earnings before net finance costs, depreciation, amortisation and impairments, taxation expense, Discontinued operations and any exceptional items. Underlying EBITDA includes BHP\u2019s share of profit/(loss) from investments accounted for using the equity method including net finance costs, depreciation, amortisation and impairments and taxation expense/(benefit). Exceptional items are excluded from Underlying EBITDA in order to enhance the comparability of such measures from period-to-period and provide investors with further clarity in order to assess the performance of the Group\u2019s operations. Management monitors exceptional items separately. Refer to note 3 \u2018Exceptional items\u2019 for additional detail. Segment assets and liabilities Total segment assets and liabilities of reportable segments represents operating assets and operating liabilities, including the carrying amount of equity accounted investments and predominantly excludes cash balances, loans to associates, interest bearing liabilities and deferred tax balances. The carrying value of investments accounted for using the equity method represents the balance of the Group\u2019s investment in equity accounted investments, with no adjustment for any cash balances, interest bearing liabilities or deferred tax balances of the equity accounted investment. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForSegmentReportingExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-618": {
   "value": "2 Revenue Revenue by segment and asset 2023  US$M 2022  US$M 2021  US$M Escondida 8,847 9,500 9,470 Pampa Norte 2,491 2,670 1,801 Copper South Australia 1 2,806 1,776 2,211 Third-party products 1,863 2,903 2,244 Other 20  \u2212  \u2212 Total Copper 2 16,027 16,849 15,726 Western Australia Iron Ore 24,678 30,632 34,337 Third-party products 21 19 18 Other 113 116 120 Total Iron Ore 24,812 30,767 34,475 BHP Mitsubishi Alliance 7,652 10,254 3,537 New South Wales Energy Coal 3,306 3,035 839 Other3 \u2013 2,260 778 Total Coal4 10,958 15,549 5,154 Group and unallocated items5 2,020 1,933 1,566 Inter-segment adjustment \u2013  \u2212  \u2212 Total revenue 53,817 65,098 56,921 1  Includes Olympic Dam as well as Prominent Hill and Carrapateena since acquisition on 2 May 2023 as part of the acquisition of OZ Minerals Ltd (OZL). 2  Total Copper revenue includes: copper US$14,902 million (2022: US$15,992 million; 2021: US$14,812 million) and other US$1,125 million (2022: US$857 million; 2021: US$914 million). Other consists of silver, zinc, molybdenum, uranium and gold. 3  Comparative periods include revenue related to BHP Mitsui Coal (BMC) divested in May 2022. 4  Total Coal revenue includes: metallurgical coal US$7,430 million (2022: US$11,990 million; 2021: US$4,260 million) and energy coal US$3,528 million (2022: US$3,559 million; 2021: US$894 million). 5  Group and unallocated items revenue includes: Nickel West US$2,009 million (2022: US$1,926 million; 2021: US$1,545 million) and other revenue US$11 million (2022: US$7 million; 2021: US$21 million). Revenue consists of revenue from contracts with customers of US$53,910 million (2022: US$65,504 million; 2021: US$55,562 million) and other revenue predominantly relating to provisionally priced sales of US$(93) million (2022: US$(406) million; 2021: US$1,359 million). Recognition and measurement The Group generates revenue from the production and sale of commodities. Revenue is recognised when or as control of the promised goods or services passes to the customer. In most instances, control passes when the goods are delivered to a destination specified by the customer, typically on board the customer\u2019s appointed vessel. Revenue from the provision of services is recognised over time as the services are provided, but does not represent a significant proportion of total revenue and is aggregated with the respective asset and product revenue for disclosure purposes. The amount of revenue recognised reflects the consideration to which the Group expects to be entitled in exchange for transferring goods or services. Where the Group\u2019s sales are provisionally priced, the final price depends on future index prices. The amount of revenue initially recognised is based on the relevant forward market price. Adjustments between the provisional and final price are accounted for under IFRS 9/AASB 9 \u2018Financial Instruments\u2019 (IFRS 9), separately recorded as other revenue and presented as part of the total revenue of each asset. The period between provisional pricing and final invoicing is typically between 60 and 120 days. Revenue from the sale of significant by-products is included within revenue. Where a by-product is not significant, revenue is credited against costs. The Group applies the following practical expedients: \u2013  expected consideration is not adjusted for the effects of the time value of money if the period between the delivery and when the customer pays for the promised good or service is one year or less \u2013  no disclosure is provided for information relating to unfulfilled performance obligations, either due to the expected duration of the contract term being one year or less, or for longer term contracts, because the entity has a right to consideration (and can recognise revenue) for goods delivered  ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRevenueExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-658": {
   "value": "Revenue consists of revenue from contracts with customers of US$53,910 million (2022: US$65,504 million; 2021: US$55,562 million) and other revenue predominantly relating to provisionally priced sales of US$(93) million (2022: US$(406) million; 2021: US$1,359 million). ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRevenueFromContractsWithCustomersExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-732": {
   "value": "Recognition and measurement The Group generates revenue from the production and sale of commodities. Revenue is recognised when or as control of the promised goods or services passes to the customer. In most instances, control passes when the goods are delivered to a destination specified by the customer, typically on board the customer\u2019s appointed vessel. Revenue from the provision of services is recognised over time as the services are provided, but does not represent a significant proportion of total revenue and is aggregated with the respective asset and product revenue for disclosure purposes. The amount of revenue recognised reflects the consideration to which the Group expects to be entitled in exchange for transferring goods or services. Where the Group\u2019s sales are provisionally priced, the final price depends on future index prices. The amount of revenue initially recognised is based on the relevant forward market price. Adjustments between the provisional and final price are accounted for under IFRS 9/AASB 9 \u2018Financial Instruments\u2019 (IFRS 9), separately recorded as other revenue and presented as part of the total revenue of each asset. The period between provisional pricing and final invoicing is typically between 60 and 120 days. Revenue from the sale of significant by-products is included within revenue. Where a by-product is not significant, revenue is credited against costs. The Group applies the following practical expedients: \u2013  expected consideration is not adjusted for the effects of the time value of money if the period between the delivery and when the customer pays for the promised good or service is one year or less \u2013  no disclosure is provided for information relating to unfulfilled performance obligations, either due to the expected duration of the contract term being one year or less, or for longer term contracts, because the entity has a right to consideration (and can recognise revenue) for goods delivered  ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForRecognitionOfRevenue",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-619": {
   "value": "3  Exceptional items Exceptional items are those gains or losses where their nature, including the expected frequency of the events giving rise to them, and impact is considered material to the Financial Statements. Such items included within the Group\u2019s profit from Continuing operations for the year are detailed below. Exceptional items attributable to Discontinued operations are detailed in note 28 \u2018Discontinued operations\u2019. Year ended 30 June 2023 Gross  US$M Tax  US$M Net  US$M Exceptional items by category Samarco dam failure (340) 17 (323) Chilean tax reform \u2013 (283) (283) Total (340) (266) (606) Attributable to non-controlling interests \u2013 (107) (107) Attributable to BHP shareholders (340) (159) (499) Samarco Minera\u00e7\u00e3o S.A. (Samarco) dam failure The loss of US$323 million (after tax) relates to the Samarco dam failure, which occurred in November 2015, and comprises the following: Year ended 30 June 2023 US$M Other income \u2013 Expenses excluding net finance costs: Costs incurred directly by BHP Brasil and other BHP entities in relation to the Samarco dam failure (103) Profit/(loss) from equity accounted investments, related impairments and expenses: Samarco dam failure provision (256) Fair value change on forward exchange derivatives 471 Net finance costs (452) Income tax benefit 17 Total1 (323) 1  Refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 for further information. Chilean tax reform On 17 May 2023, the Chilean Lower House approved a Royalty Bill which will implement a 1 per cent royalty on revenues, a margin based tax with rates ranging between 8 per cent and 26 per cent, and a 46.5 per cent cap to the overall Chilean tax burden of mining companies. The President of the Lower House formally declared the legislative process complete on 12 June 2023, following receipt of the Chilean President\u2019s formal confirmation that he had waived his veto power to oppose any of the provisions of the Royalty Bill. On 13 July 2023, the Constitutional Court finalised its review of certain aspects of the Royalty Bill, relating only to the distribution of proceeds. Applying judgement, it was determined that the proposed tax rates were substantively enacted prior to 30 June 2023, as the scope of the Constitutional Court review did not extend to reviewing the tax rates. While the timing of when the Group\u2019s operations will be impacted by the reform depends on existing stability agreements, relevant deferred tax positions have been remeasured by US$283 million in the Group\u2019s FY2023 financial statements. The exceptional items relating to the years ended 30 June 2022 and 30 June 2021 are detailed below. 30 June 2022 Year ended 30 June 2022 Gross  US$M Tax  US$M Net  US$M Exceptional items by category Samarco dam failure (1,032) (31) (1,063) Impairment of US deferred tax assets  \u2212 (423) (423) Corporate structure unification costs (428)  \u2212 (428) BHP Mitsui Coal (BMC) gain on disposal 840  \u2212 840 Total (620) (454) (1,074) Attributable to non-controlling interests  \u2212  \u2212  \u2212 Attributable to BHP shareholders (620) (454) (1,074) Samarco Minera\u00e7\u00e3o S.A. (Samarco) dam failure The loss of US$1,063 million related to the Samarco dam failure, which occurred in November 2015, and comprises the following: Year ended 30 June 2022 US$M Other income  \u2212 Expenses excluding net finance costs: Costs incurred directly by BHP Brasil and other BHP entities in relation to the Samarco dam failure (66) Profit/(loss) from equity accounted investments, related impairments and expenses: Samarco impairment expense   \u2212 Samarco dam failure provision (595) Fair value change on forward exchange derivatives (81) Net finance costs (290) Income tax expense (31) Total 1 (1,063) 1  Refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 for further information. Impairment of US deferred tax assets The Group recognised an impairment charge of US$423 million (after tax) in relation to deferred tax assets where the recoverability had historically been reliant on Petroleum earnings in the same tax group. While these tax assets remained with the Group following the merger of the Group\u2019s oil and gas portfolio with Woodside, the impairment charge reflected the extent of other forecasted future earnings against which the assets can be recovered. Corporate structure unification costs The Group incurred transaction costs associated with the unification of the Group corporate structure under its existing Australian parent company, BHP Group Limited, which was completed on 31 January 2022. BHP Mitsui Coal (BMC) gain on disposal On 3 May 2022 the Group sold its 80 per cent interest in BHP Mitsui Coal Pty Ltd (BMC) to Stanmore SMC Holdings Pty Ltd, a wholly owned subsidiary of Stanmore Resources Limited (Stanmore Resources). Stanmore Resources paid US$1.1 billion cash consideration at completion plus a preliminary completion adjustment of US$218 million for working capital. Deferred consideration of US$222 million comprised US$100 million in cash, outstanding at 30 June 2022 and subsequently received on 3 November 2022, with potential for an additional amount of up to US$150 million (US$122 million discounted) in a price-linked earnout payable in the 2024 calendar year. Details of the gain on disposal is as follows: US$M BHP share of net assets disposed 631 Gross consideration 1,318 Transaction and other directly applicable costs (69) Income tax expense  \u2212 Deferred consideration 222 Gain on disposal 840 30 June 2021 Year ended 30 June 2021 Gross US$M Tax US$M Net US$M Exceptional items by category Samarco dam failure (1,087) (71) (1,158) COVID-19 related costs (499) 138 (361) Impairment of Energy coal assets (1,523) (651) (2,174) Impairment of Potash assets (1,314) (473) (1,787) Total (4,423) (1,057) (5,480) Attributable to non-controlling interests (34) 10 (24) Attributable to BHP shareholders (4,389) (1,067) (5,456) Samarco Minera\u00e7\u00e3o S.A. (Samarco) dam failure The loss of US$1,158 million related to the Samarco dam failure, which occurred in November 2015, and comprises the following: Year ended 30 June 2021 US$M Other income 34 Expenses excluding net finance costs: Costs incurred directly by BHP Brasil and other BHP entities in relation to the Samarco dam failure (46) Profit/(loss) from equity accounted investments, related impairments and expenses: Samarco impairment expense  (111) Samarco dam failure provision (1,015) Fair value change on forward exchange derivatives 136 Net finance costs (85) Income tax expense (71) Total1 (1,158) 1  Refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 for further information. COVID-19 related costs The exceptional item reflects the directly attributable COVID-19 pandemic related additional costs for the Group for FY2021, including costs associated with the increased provision of health and hygiene services, the impacts of maintaining social distancing requirements and demurrage and other standby charges related to delays caused by COVID-19. At the time, COVID-19 was considered a single protracted globally pervasive event. However, as the pandemic has continued to evolve, certain impacts that were initially considered to be potentially short-term in nature are now expected to continue over a number of reporting periods. These activities are now considered to be part of business as usual operations and, as such, from FY2022 any incremental costs have not been classified as an exceptional item. Impairment of Energy coal assets The Group recognised an impairment charge of US$1,704 million (after tax) in relation to New South Wales Energy Coal (NSWEC) reflecting the status of the divestment process and current market conditions for thermal coal, the strengthening Australian dollar and changes to the mine plan. In addition, the Group recognised an impairment charge of US$470 million (after tax) for Cerrej\u00f3n, reflecting the expected net sales proceeds. Impairment of Potash assets The Group recognised an impairment charge of US$1,787 million (after tax) in relation to Potash. The impairment charge reflected an analysis of market perspectives and the value that we expected a market participant to attribute to our investments to date. ",
   "dimensions": {
    "concept": "bhp:DisclosureOfExceptionalItems",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-733": {
   "value": "Exceptional items are those gains or losses where their nature, including the expected frequency of the events giving rise to them, and impact is considered material to the Financial Statements. Such items included within the Group\u2019s profit from Continuing operations for the year are detailed below. Exceptional items attributable to Discontinued operations are detailed in note 28 \u2018Discontinued operations\u2019. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForExceptionalItemsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-620": {
   "value": "4  Significant events \u2013 Samarco dam failure On 5 November 2015, the Samarco Minera\u00e7\u00e3o S.A. (Samarco) iron ore operation in Minas Gerais, Brazil, experienced a tailings dam failure that resulted in a release of mine tailings, flooding the communities of Bento Rodrigues, Gesteira and Paracatu and impacting other communities downstream (the Samarco dam failure). Refer to section on \u2018Samarco\u2019 in the Operating and Financial Review. Samarco is jointly owned by BHP Billiton Brasil Ltda (BHP Brasil) and Vale S.A. (Vale). BHP Brasil\u2019s 50 per cent interest is accounted for as an equity accounted joint venture investment. BHP Brasil does not separately recognise its share of the underlying assets and liabilities of Samarco, but instead records the investment as one line on the balance sheet. Each period, BHP Brasil recognised its 50 per cent share of Samarco\u2019s profit or loss and adjusted the carrying value of the investment in Samarco accordingly. Such adjustment continued until the investment carrying value was reduced to US$ nil, with any additional share of Samarco losses only recognised to the extent that BHP Brasil has an obligation to fund the losses. After applying equity accounting, any remaining carrying value of the investment is tested for impairment. Any charges relating to the Samarco dam failure incurred directly by BHP Brasil or other BHP entities are recognised 100 per cent in the Group\u2019s results. The financial impacts of the Samarco dam failure on the Group\u2019s income statement, balance sheet and cash flow statement for the year ended 30 June 2023 are shown in the tables below and have been treated as an exceptional item. Financial impacts of Samarco dam failure 2023  US$M 2022  US$M 2021 US$M Income statement Other income1 \u2013  \u2212 34 Expenses excluding net finance costs: Costs incurred directly by BHP Brasil and other BHP entities in relation to the Samarco dam failure2 (103) (66) (46) Profit/(loss) from equity accounted investments, related impairments and expenses: Samarco impairment expense3 \u2013  \u2212 (111) Samarco dam failure provision 4 (256) (595) (1,015) Fair value change on forward exchange derivatives5 471 (81) 136 Profit/(loss) from operations 112 (742) (1,002) Net finance costs6 (452) (290) (85) Loss before taxation (340) (1,032) (1,087) Income tax benefit/(expense) 7 17 (31) (71) Loss after taxation (323) (1,063) (1,158) Balance sheet movement Trade and other payables  (6) (1) (5) Derivatives 337 (160) 136 Tax liabilities 17 (31) (71) Provisions (260) (629) (741) Net decrease/(increase) in liabilities 88 (821) (681) 2023 US$M 2022 US$M 2021 US$M Cash flow statement Loss before taxation (340) (1,032) (1,087) Adjustments for: Samarco impairment expense3 \u2013  \u2212 111 Samarco dam failure provision4 256 595 1,015 Fair value change on forward exchange derivatives5 (471) 81 (136) Proceeds of cash management related instruments 134 79 \u2013 Net finance costs6 452 290 85 Changes in assets and liabilities: Trade and other payables 6 1 5 Net operating cash flows 37 14 (7) Net investment and funding of equity accounted investments8 (448) (256) (470) Net investing cash flows (448) (256) (470) Net decrease in cash and cash equivalents (411) (242) (477) 1  Proceeds from insurance settlements. 2  Includes legal and advisor costs incurred. 3  Impairment expense from working capital funding provided during the period. 4  US$(33) million (2022: US$691 million; 2021: US$836 million) change in estimate and US$289 million (2022: US$(96) million; 2021: US$179 million) exchange translation. 5  The Group enters into forward exchange contracts to limit the Brazilian reais exposure on the dam failure provision. While not applying hedge accounting, the fair value changes in the forward exchange instruments are recorded within Profit/(loss) from equity accounted investments, related impairments and expenses in the Income Statement. 6  Amortisation of discounting of provision. 7  Includes tax on forward exchange derivatives and other taxes incurred during the period. 8  Includes US$ nil (2022: US$ nil; 2021: US$(111) million) funding provided during the period and US$(448) million (2022: US$(256) million; 2021: US$(359) million) utilisation of the Samarco dam failure provision. Equity accounted investment in Samarco BHP Brasil\u2019s investment in Samarco remains at US$ nil. No dividends have been received by BHP Brasil from Samarco during the period and Samarco currently does not have profits available for distribution. Provision related to the Samarco dam failure 2023  US$M 2022  US$M At the beginning of the financial year 3,421 2,792 Movement in provision 260 629 Comprising: Utilised (448) (256) Adjustments charged to the income statement: Change in cost estimate  (33) 691 Amortisation of discounting impacting net finance costs 452 290 Exchange translation 289 (96) At the end of the financial year 3,681 3,421 Comprising: Current 1,876 1,815 Non-current 1,805 1,606 At the end of the financial year 3,681 3,421 Samarco dam failure provision and contingencies As at 30 June 2023, BHP Brasil has identified a provision and certain contingent liabilities arising as a consequence of the Samarco dam failure. The provision only reflects the future cost estimates associated with the delivery of programs set out in the Framework Agreement (see below). Contingent liabilities will only be resolved when one or more uncertain future events occur or related impacts become capable of reliable measurement and, as such, determination of contingent liabilities disclosed in the financial statements requires significant judgement regarding the outcome of future events. A number of the claims below do not specify the amount of damages sought and, where this is specified, amounts could change as the matter progresses. Ultimately, future changes in all those matters for which a provision has been recognised or contingent liability disclosed could have a material adverse impact on BHP\u2019s business, competitive position, cash flows, prospects, liquidity and shareholder returns. The following table summarises the current status of significant ongoing matters relating to the Samarco dam failure, along with developments during the financial year, and the associated treatment in the Financial Statements: Item Provision Contingent liability Samarco dam failure \u2013 Framework Agreement On 2 March 2016, BHP Brasil, Samarco and Vale entered into a Framework Agreement with the Federal Government of Brazil, the states of Espirito Santo and Minas Gerais, and certain other public authorities to establish a foundation (Funda\u00e7\u00e3o Renova) that is developing and executing environmental and socio-economic programs (Programs) to remediate and provide compensation for damage caused by the Samarco dam failure (the Framework Agreement). Key programs include those for financial assistance and compensation of impacted persons and those for remediation of impacted areas and resettlement of impacted communities. Samarco has primary responsibility for funding Funda\u00e7\u00e3o Renova with each of BHP Brasil and Vale having secondary funding obligations in proportion to their 50 per cent shareholding in Samarco. While Samarco has recommenced operations, Samarco\u2019s long-term cash flow generation remains highly sensitive to factors including returning to full production capacity, commodity prices and foreign exchange rates. Further, under the proposed resolution to the Samarco Judicial Reorganisation (refer to Samarco Judicial Reorganisation below), Samarco\u2019s funding of Funda\u00e7\u00e3o Renova would be capped at US$1 billion for the period CY2024 to CY2030. Given the proposed Samarco funding cap and uncertainty associated with Samarco\u2019s long-term cash flow generation, BHP Brasil has recognised a provision reflecting the Group\u2019s current best estimate of the costs to be incurred in completing the Programs under the Framework Agreement. Uncertainty exists around the scope and cost of the programs, including as a result of ongoing legal actions in relation to the number of individuals eligible for compensation and the amount of damages to which they are entitled. Further, the provision reflects only the estimated cost of completing the Programs as the Group is unable to provide a range of possible outcomes or a reliable estimate of other existing or future claims (as outlined below). Federal Public Prosecution Office claim BHP Brasil is among the defendants named in a claim brought by the Federal Public Prosecution Office on 3 May 2016, seeking R$155 billion (approximately US$32 billion) for reparation, compensation and moral damages in relation to the Samarco dam failure. Under a Governance Agreement ratified on 8 August 2018, BHP Brasil, Samarco and Vale were to establish a process to renegotiate the Programs over two years with the Federal and State prosecutors to progress settlement of this claim. The Federal Public Prosecution Office claim was suspended from the date of ratification of the Governance Agreement and, although the suspension period has formally elapsed, no material development has occurred. Since early CY2021, the parties have been engaging in negotiations to seek a settlement of obligations under the Framework Agreement and Federal Public Prosecution Office claim. Outcomes of the negotiations are highly uncertain, and it is therefore not possible to provide a reliable estimate of potential outcomes and there is a risk that a negotiated outcome may be materially higher than the cost estimates of delivering the programs under the Framework Agreement. BHP Brasil, Samarco and Vale maintain security, as required by the Governance Agreement, with the security currently comprising insurance bonds and a charge over certain Samarco assets. Australian class action complaint BHP Group Limited is named as a defendant in a shareholder class action filed in the Federal Court of Australia on behalf of persons who acquired shares in BHP Group Limited on the Australian Securities Exchange (ASX) or shares in BHP Group Plc (now BHP Group (UK) Ltd) on the London Stock Exchange (LSE) and Johannesburg Stock Exchange (JSE) in periods prior to the Samarco dam failure. The amount of damages sought is unspecified. Item Provision Contingent liability United Kingdom group action complaint BHP Group (UK) Ltd (formerly BHP Group Plc) and BHP Group Limited are named as defendants in group action claims for damages filed in the courts of England. These claims were filed on behalf of certain individuals, governments, businesses and communities in Brazil allegedly impacted by the Samarco dam failure. The amount of damages sought in these claims is unspecified. A trial in relation to BHP\u2019s liability for the dam failure is listed for October 2024. In December 2022, the BHP defendants filed their defence and a contribution claim against Vale. The contribution claims contends that if BHP\u2019s defence is not successful and the BHP defendants are ordered to pay damages to the claimants, Vale should contribute to any amount payable. Vale contested the jurisdiction of the English courts to determine this contribution claim, with the court dismissing Vale\u2019s application on 7 August 2023. Subject to the outcome of any appeals by Vale in relation to jurisdiction and directions from the Court, the contribution claim will proceed in the UK. Criminal charges The Federal Prosecutors\u2019 Office has filed criminal charges against BHP Brasil, Samarco and Vale and certain employees and former employees of BHP Brasil (Affected Individuals) in the Federal Court of Ponte Nova, Minas Gerais. BHP Brasil rejects outright the charges against the company and the Affected Individuals and is defending itself from all charges while fully supporting each of the Affected Individuals in their defence of the charges. Civil public action commenced by Associations concerning the use of TANFLOC for water treatment The Vila Lenira Residents Association, State of Espirito Santo Rural Producers and Artisans Association, Colatina Velha Neighbourhood Residents Association, and United for the Progress of Palmeiras Neighbourhood Association have filed a lawsuit against Samarco, BHP Brasil and Vale and others, including the State of Minas Gerais, the State of Espirito Santo and the Federal Government. The plaintiffs allege that the defendants carried out a clandestine study on the citizens of the locations affected by the Fund\u00e3o Dam Failure, using TANFLOC \u2013 a tannin-based flocculant/coagulant \u2013 that is currently used for wastewater treatment applications. The plaintiffs claim that this product allegedly put the population at risk due to its alleged experimental qualities. The plaintiffs are seeking multiple kinds of relief \u2013 material damages, moral damages, loss of profits \u2013 and that the defendants should pay for water supply in all locations where there is no water source other than the Doce River. The defendants have presented their defences and the Court\u2019s decision is still pending. Other claims BHP Brasil is among the companies named as defendants in a number of legal proceedings initiated by individuals, non-governmental organisations, corporations and governmental entities in Brazilian Federal and State courts following the Samarco dam failure. The other defendants include Vale, Samarco and Funda\u00e7\u00e3o Renova. The lawsuits include claims for compensation, environmental reparation and violations of Brazilian environmental and other laws, among other matters. The lawsuits seek various remedies including reparation costs, compensation to injured individuals and families of the deceased, recovery of personal and property losses, moral damages and injunctive relief. In addition, government inquiries and investigations relating to the Samarco dam failure have been commenced by numerous agencies of the Brazilian government and are ongoing. Additional lawsuits and government investigations relating to the Samarco dam failure could be brought against BHP Brasil and other BHP entities in Brazil or other jurisdictions. Commitments Under the terms of the Samarco joint venture agreement, BHP Brasil does not have an existing obligation to fund Samarco. However, BHP Brasil has agreed to fund a total of up to US$915 million for the Funda\u00e7\u00e3o Renova programs during calendar year 2023. Any additional requests for funding or future investment provided would be subject to a future decision by BHP Brasil, accounted for at that time. Samarco judicial reorganisation Samarco filed for Judicial Reorganisation (JR) in April 2021, with the Second Business State Court for the Belo Horizonte District of Minas Gerais, State of Minas Gerais, Brazil (JR Court), after multiple enforcement actions taken by certain financial creditors of Samarco which threatened Samarco\u2019s operations. The JR is an insolvency proceeding that provides a means for Samarco to seek to restructure its financial debts and establish a stable financial position that allows Samarco to continue to rebuild its operations and strengthen its ability to meet its Funda\u00e7\u00e3o Renova related funding obligations. Samarco\u2019s operations have continued during the JR proceeding. On 31 May 2023, Samarco, BHP Brasil and Vale entered into a Restructuring Support Agreement (RSA) with certain Samarco financial creditors. The RSA outlines the proposed parameters for a restructure of Samarco\u2019s financial debts, to be implemented through a consensual judicial reorganisation plan (Consensual Plan), subject to approval by the creditors of Samarco and ratification by the JR Court. On 28 July 2023, Samarco and one of the financial creditors jointly filed the Consensual Plan with the JR Court, that aims at implementing and is consistent with the transactions contemplated in the RSA. Concurrent with the filing of the Consensual Plan, the parties also filed terms of adhesion that demonstrate approval of the Consensual Plan by the majority of Samarco\u2019s creditors as required under Brazilian Bankruptcy Law. Once ratified by the JR Court and confirmed by the United States Bankruptcy Court for the Southern District of New York, the Samarco debt restructure, including payments to Samarco employees and suppliers as stipulated in the Plan and the issuance of new debt instruments to financial creditors is expected to be executed in the first half of FY2024. The proposed terms of the Plan are not expected to impact Funda\u00e7\u00e3o Renova\u2019s ability to undertake the remediation and compensation Programs. Samarco\u2019s funding of Renova is proposed to be capped at US$1 billion for the period CY2024 to CY2030. BHP Brasil has considered this proposed cap, along with Samarco\u2019s long-term forecast cash flows, when determining the dam failure related provision at 30 June 2023. Key judgements and estimates Judgements: The outcomes of litigation are inherently difficult to predict and significant judgement has been applied in assessing the likely outcome of legal claims and determining which legal claims require recognition of a provision or disclosure of a contingent liability. The facts and circumstances relating to these cases are regularly evaluated in determining whether a provision for any specific claim is required. Management has determined that a provision can only be recognised for obligations under the Framework Agreement as at 30 June 2023. It is not yet possible to provide a range of possible outcomes or a reliable estimate of potential future exposures to BHP in connection to the contingent liabilities noted above, given their status. Estimates: The provision for the Samarco dam failure reflects the Group\u2019s estimate of the remaining costs to complete Programs under the Framework Agreement and requires the use of significant judgements, estimates and assumptions. Based on current estimates, it is expected that approximately 85 per cent of remaining costs for Programs under the Framework Agreement will be incurred by June 2025, largely attributable to the finalisation of the resettlement program and closure of the Novel system (application system for impacted individuals to lodge compensation claims). While the provision has been measured based on the latest information available as at 30 June 2023, changes in facts and circumstances are likely in future reporting periods and may lead to material revisions to these estimates. However, it is currently not possible to determine what facts and circumstances may change, therefore revisions in future reporting periods due to the key estimates and factors outlined below cannot be reliably measured. The key estimates that may have a material impact upon the provision in the next and future reporting periods include the: \u2013  number of people eligible for financial assistance and compensation and the corresponding amount of expected compensation; and \u2013  costs to complete key infrastructure programs. The provision may also be affected by factors including but not limited to: \u2013  potential changes in scope of work and funding amounts required under the Framework Agreement including the impact of further technical analysis, community participation required under the Governance Agreement and rulings made by the Federal Court; \u2013  the outcome of ongoing negotiations with State and Federal Prosecutors, including review of Funda\u00e7\u00e3o Renova\u2019s Programs as provided in the Governance Agreement; \u2013  actual costs incurred; \u2013  updates to discount and foreign exchange rates; and \u2013  the outcomes of Samarco\u2019s judicial reorganisation and resolution of uncertainty in respect of the nature and extent of Samarco\u2019s long-term cash generation. In addition, the provision may be impacted by decisions in, or resolution of, existing and potential legal claims in Brazil and other jurisdictions, including the outcome of the United Kingdom group action and the negotiations seeking a definitive and substantive settlement of the obligations under the Framework Agreement and the R$155 billion (approximately US$32 billion) Federal Public Prosecution Office claim. Outcomes of the negotiations are highly uncertain and it is therefore not possible to provide a reliable estimate of potential outcomes. Given these factors, future actual cash outflows may differ from the amounts currently provided and changes to any of the key assumptions and estimates outlined above could result in a material impact to the provision in the next and future reporting periods. The following section includes disclosure of amounts recognised or disclosed by Samarco in its financial statements for matters to which Samarco (and not the Group) is a party. Samarco Dam failure related provision and contingencies In addition to its obligations under the Framework Agreement as at 30 June 2023, Samarco has recognised a provision of US$0.4 billion (30 June 2022: US$0.3 billion), based on currently available information. The magnitude, scope and timing of these additional costs are subject to a high degree of uncertainty and Samarco has indicated that it anticipates that it will incur future costs beyond those provided. These uncertainties are likely to continue for a significant period and changes to key assumptions could result in a material change to the amount of the provision in future reporting periods. Any such unrecognised obligations are therefore contingent liabilities and, at present, it is not practicable to estimate their magnitude or possible timing of payment. Accordingly, it is also not possible to provide a range of possible outcomes or a reliable estimate of total potential future exposures at this time. Samarco is also named as a defendant in a number of other legal proceedings initiated by individuals, non-governmental organisations, corporations and governmental entities in Brazilian Federal and State courts following the Samarco dam failure. The lawsuits include claims for compensation, environmental rehabilitation and violations of Brazilian environmental and other laws, among other matters. The lawsuits seek various remedies including rehabilitation costs, compensation to injured individuals and families of the deceased, recovery of personal and property losses, moral damages and injunctive relief. In addition, government inquiries and investigations relating to the Samarco dam failure have been commenced by numerous agencies of the Brazilian government and are ongoing. Given the status of proceedings it is not possible to provide a range of possible outcomes or a reliable estimate of total potential future exposures to Samarco. Additional lawsuits and government investigations relating to the Samarco dam failure could be brought against Samarco. Samarco insurance Samarco has standalone insurance policies in place with Brazilian and global insurers. Insurers\u2019 loss adjusters or claims representatives continue to investigate and assist with the claims process for matters not yet settled. As at 30 June 2023, an insurance receivable has not been recognised by Samarco in respect of ongoing matters. Samarco commitments At 30 June 2023, Samarco has commitments of US$1.0 billion (30 June 2022: US$0.7 billion). Following the dam failure, Samarco invoked force majeure clauses in a number of long-term contracts with suppliers and service providers to suspend contractual obligations. Samarco non-dam failure related provisions and contingent liabilities The following non-dam failure related matters pre-date and are unrelated to the Samarco dam failure. Samarco is currently contesting both of these matters in the Brazilian courts. Given the status of these tax matters, the timing of resolution and potential economic outflow for Samarco is uncertain. Brazilian Social Contribution Levy Samarco has received tax assessments for the alleged non-payment of Brazilian Social Contribution Levy for the calendar years 2007- 2014. Based on its assessment of currently available information as at 30 June 2023, Samarco recognised gross provisions of US$1.1 billion, US$0.9 billion net of US$0.2 billion court deposits paid (30 June 2022: nil) and disclosed contingent liabilities of US$0.2 billion (30 June 2022: US $1.2 billion). As at 30 June 2023, BHP Brasil\u2019s 50% share of the impact of the provision recognised by Samarco is reflected in the Group\u2019s equity accounting for Samarco. Brazilian corporate income tax rate Samarco has received tax assessments, and disclosed contingent liabilities, for alleged incorrect calculation of Corporate Income Tax (IRPJ) in respect of the 2000-2003 and 2007-2014 income years totalling approximately US$1.1 billion (30 June 2022: US$0.9 billion). ",
   "dimensions": {
    "concept": "bhp:DisclosureOfSignificantEventsSamarcoDamFailure",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-659": {
   "value": "Provision related to the Samarco dam failure 2023  US$M 2022  US$M At the beginning of the financial year 3,421 2,792 Movement in provision 260 629 Comprising: Utilised (448) (256) Adjustments charged to the income statement: Change in cost estimate  (33) 691 Amortisation of discounting impacting net finance costs 452 290 Exchange translation 289 (96) At the end of the financial year 3,681 3,421 Comprising: Current 1,876 1,815 Non-current 1,805 1,606 At the end of the financial year 3,681 3,421 ",
   "dimensions": {
    "concept": "bhp:DisclosureOfSamarcoProvision",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-711": {
   "value": "5  Expenses and other income 2023  US$M 2022  US$M 2021  US$M Employee benefits expense: Wages and salaries 4,539 4,197 4,018 Employee share awards 97 109 88 Social security costs 4 4 3 Pension and other post-retirement obligations 339 338 274 Less employee benefits expense classified as exploration and evaluation expenditure (35) (30) (26) Changes in inventories of finished goods and work in progress 301 (774) (321) Raw materials and consumables used 6,710 5,991 4,899 Freight and transportation 2,299 2,319 1,900 External services  4,768 4,525 4,640 Third-party commodity purchases 1,878 2,959 2,220 Net foreign exchange (gains)/losses (197) (326) 293 Fair value change on derivatives1 135 (29) 87 Government royalties paid and payable 3,841 4,014 3,080 Exploration and evaluation expenditure incurred and expensed in the current period 294 199 134 Depreciation and amortisation expense 5,061 5,683 5,084 Net impairments: Property, plant and equipment 73 515 2,474 Goodwill and other intangible assets 2  \u2212 33 All other operating expenses 1,764 2,677 1,991 Total expenses 31,873 32,371 30,871 Insurance recoveries \u2013 (4) (46) (Gain)/loss on disposal of subsidiaries and operations 2 (8) (840) 2 Dividend income3 (19) (241) (2) Other income4 (367) (313) (334) Total other income (394) (1,398) (380) 1  Fair value change on derivatives is principally related to commodity price contracts, foreign exchange contracts and embedded derivatives used in the ordinary course of business as well as derivatives used as part of the funding of dividends. 2  Mainly relates to the divestment of BMC in FY2022. Refer to note 3 \u2018Exceptional items\u2019 for further information. 3  During FY2022, the Group received dividends of US$238 million from Cerrej\u00f3n, which reduced completion proceeds net of transaction costs to US$50 million. On 11 January 2022, BHP completed the sale of its 33.33 per cent interest in Cerrej\u00f3n to joint venture partner, Glencore plc. 4  Other income is generally income earned from transactions outside the course of the Group\u2019s ordinary activities and may include certain management fees from non-controlling interests and joint arrangements, royalties and commission income.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfExpensesByNatureExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-695": {
   "value": "5  Expenses and other income 2023  US$M 2022  US$M 2021  US$M Employee benefits expense: Wages and salaries 4,539 4,197 4,018 Employee share awards 97 109 88 Social security costs 4 4 3 Pension and other post-retirement obligations 339 338 274 Less employee benefits expense classified as exploration and evaluation expenditure (35) (30) (26) Changes in inventories of finished goods and work in progress 301 (774) (321) Raw materials and consumables used 6,710 5,991 4,899 Freight and transportation 2,299 2,319 1,900 External services  4,768 4,525 4,640 Third-party commodity purchases 1,878 2,959 2,220 Net foreign exchange (gains)/losses (197) (326) 293 Fair value change on derivatives1 135 (29) 87 Government royalties paid and payable 3,841 4,014 3,080 Exploration and evaluation expenditure incurred and expensed in the current period 294 199 134 Depreciation and amortisation expense 5,061 5,683 5,084 Net impairments: Property, plant and equipment 73 515 2,474 Goodwill and other intangible assets 2  \u2212 33 All other operating expenses 1,764 2,677 1,991 Total expenses 31,873 32,371 30,871 Insurance recoveries \u2013 (4) (46) (Gain)/loss on disposal of subsidiaries and operations 2 (8) (840) 2 Dividend income3 (19) (241) (2) Other income4 (367) (313) (334) Total other income (394) (1,398) (380) 1  Fair value change on derivatives is principally related to commodity price contracts, foreign exchange contracts and embedded derivatives used in the ordinary course of business as well as derivatives used as part of the funding of dividends. 2  Mainly relates to the divestment of BMC in FY2022. Refer to note 3 \u2018Exceptional items\u2019 for further information. 3  During FY2022, the Group received dividends of US$238 million from Cerrej\u00f3n, which reduced completion proceeds net of transaction costs to US$50 million. On 11 January 2022, BHP completed the sale of its 33.33 per cent interest in Cerrej\u00f3n to joint venture partner, Glencore plc. 4  Other income is generally income earned from transactions outside the course of the Group\u2019s ordinary activities and may include certain management fees from non-controlling interests and joint arrangements, royalties and commission income. Recognition and measurement Other income is recognised when it is probable that the economic benefits associated with a transaction will flow to the Group and can be reliably measured. Dividend income is recognised upon declaration. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherOperatingIncomeExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-621": {
   "value": "5  Expenses and other income 2023  US$M 2022  US$M 2021  US$M Employee benefits expense: Wages and salaries 4,539 4,197 4,018 Employee share awards 97 109 88 Social security costs 4 4 3 Pension and other post-retirement obligations 339 338 274 Less employee benefits expense classified as exploration and evaluation expenditure (35) (30) (26) Changes in inventories of finished goods and work in progress 301 (774) (321) Raw materials and consumables used 6,710 5,991 4,899 Freight and transportation 2,299 2,319 1,900 External services  4,768 4,525 4,640 Third-party commodity purchases 1,878 2,959 2,220 Net foreign exchange (gains)/losses (197) (326) 293 Fair value change on derivatives1 135 (29) 87 Government royalties paid and payable 3,841 4,014 3,080 Exploration and evaluation expenditure incurred and expensed in the current period 294 199 134 Depreciation and amortisation expense 5,061 5,683 5,084 Net impairments: Property, plant and equipment 73 515 2,474 Goodwill and other intangible assets 2  \u2212 33 All other operating expenses 1,764 2,677 1,991 Total expenses 31,873 32,371 30,871 Insurance recoveries \u2013 (4) (46) (Gain)/loss on disposal of subsidiaries and operations 2 (8) (840) 2 Dividend income3 (19) (241) (2) Other income4 (367) (313) (334) Total other income (394) (1,398) (380) 1  Fair value change on derivatives is principally related to commodity price contracts, foreign exchange contracts and embedded derivatives used in the ordinary course of business as well as derivatives used as part of the funding of dividends. 2  Mainly relates to the divestment of BMC in FY2022. Refer to note 3 \u2018Exceptional items\u2019 for further information. 3  During FY2022, the Group received dividends of US$238 million from Cerrej\u00f3n, which reduced completion proceeds net of transaction costs to US$50 million. On 11 January 2022, BHP completed the sale of its 33.33 per cent interest in Cerrej\u00f3n to joint venture partner, Glencore plc. 4  Other income is generally income earned from transactions outside the course of the Group\u2019s ordinary activities and may include certain management fees from non-controlling interests and joint arrangements, royalties and commission income. Recognition and measurement Other income is recognised when it is probable that the economic benefits associated with a transaction will flow to the Group and can be reliably measured. Dividend income is recognised upon declaration. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherOperatingExpenseExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-660": {
   "value": "5  Expenses and other income 2023  US$M 2022  US$M 2021  US$M Employee benefits expense: Wages and salaries 4,539 4,197 4,018 Employee share awards 97 109 88 Social security costs 4 4 3 Pension and other post-retirement obligations 339 338 274 Less employee benefits expense classified as exploration and evaluation expenditure (35) (30) (26) Changes in inventories of finished goods and work in progress 301 (774) (321) Raw materials and consumables used 6,710 5,991 4,899 Freight and transportation 2,299 2,319 1,900 External services  4,768 4,525 4,640 Third-party commodity purchases 1,878 2,959 2,220 Net foreign exchange (gains)/losses (197) (326) 293 Fair value change on derivatives1 135 (29) 87 Government royalties paid and payable 3,841 4,014 3,080 Exploration and evaluation expenditure incurred and expensed in the current period 294 199 134 Depreciation and amortisation expense 5,061 5,683 5,084 Net impairments: Property, plant and equipment 73 515 2,474 Goodwill and other intangible assets 2  \u2212 33 All other operating expenses 1,764 2,677 1,991 Total expenses 31,873 32,371 30,871 Insurance recoveries \u2013 (4) (46) (Gain)/loss on disposal of subsidiaries and operations 2 (8) (840) 2 Dividend income3 (19) (241) (2) Other income4 (367) (313) (334) Total other income (394) (1,398) (380) 1  Fair value change on derivatives is principally related to commodity price contracts, foreign exchange contracts and embedded derivatives used in the ordinary course of business as well as derivatives used as part of the funding of dividends. 2  Mainly relates to the divestment of BMC in FY2022. Refer to note 3 \u2018Exceptional items\u2019 for further information. 3  During FY2022, the Group received dividends of US$238 million from Cerrej\u00f3n, which reduced completion proceeds net of transaction costs to US$50 million. On 11 January 2022, BHP completed the sale of its 33.33 per cent interest in Cerrej\u00f3n to joint venture partner, Glencore plc. 4  Other income is generally income earned from transactions outside the course of the Group\u2019s ordinary activities and may include certain management fees from non-controlling interests and joint arrangements, royalties and commission income. Recognition and measurement Other income is recognised when it is probable that the economic benefits associated with a transaction will flow to the Group and can be reliably measured. Dividend income is recognised upon declaration. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherOperatingIncomeExpenseExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-734": {
   "value": "Recognition and measurement Other income is recognised when it is probable that the economic benefits associated with a transaction will flow to the Group and can be reliably measured. Dividend income is recognised upon declaration. ",
   "dimensions": {
    "concept": "bhp:DescriptionOfAccountingPolicyForOtherIncome",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-622": {
   "value": "6  Income tax expense 2023  US$M 2022  US$M 2021  US$M Total taxation expense comprises: Current tax expense 6,690 10,673 9,018 Deferred tax expense 387 64 1,598 Total taxation expense 7,077 10,737 10,616 2023  US$M 2022  US$M 2021  US$M Factors affecting income tax expense for the year Income tax expense differs to the standard rate of corporation tax as follows: Profit before taxation 21,401 33,137 24,292 Tax on profit at Australian prima facie tax rate of 30 per cent 6,420 9,941 7,288 Derecognition of deferred tax assets and current year tax losses1 526 1,087 2,640 Tax on remitted and unremitted foreign earnings 137 441 485 Foreign exchange adjustments 94 (233) (33) Tax rate changes \u2013  \u2212 (1) Amounts (over)/under provided in prior years  (18) (80) (57) Tax effect of profit/(loss) from equity accounted investments, related impairments and expenses 2  (37) (19) 315 Recognition of previously unrecognised tax assets  (109) (3) (28) Impact of tax rates applicable outside of Australia (558) (801) (669) Other  236 97 436 Income tax expense 6,691 10,430 10,376 Royalty-related taxation (net of income tax benefit)3 386 307 240 Total taxation expense 7,077 10,737 10,616 1  Includes the tax impacts related to the exceptional impairments of US deferred tax assets in the year ended 30 June 2022 and, NSWEC and Potash in the year ended 30 June 2021, as presented in note 3 \u2018Exceptional items\u2019. 2  The loss from equity accounted investments, related impairments and expenses is net of income tax, with the exception of the Samarco forward exchange derivatives described in note 4 \u2018Significant events \u2013 Samarco dam failure\u2019. This item removes the prima facie tax effect on such loss, related impairments and expenses, excluding the impact of the Samarco forward exchange derivatives which are taxable. 3  Includes the revaluation of deferred tax balances in the year ended 30 June 2023, following the substantive enactment of the Chilean Royalty Bill, as presented in note 3 \u2018Exceptional items\u2019. Income tax recognised in other comprehensive income is as follows: 2023  US$M 2022  US$M 2021  US$M Income tax effect of: Items that may be reclassified subsequently to the income statement: Hedges: Gains/(losses) taken to equity (29) 274 (259) (Gains)/losses transferred to the income statement 45 (264) 252 Others (11)  \u2212 (1) Income tax credit/(charge) relating to items that may be reclassified subsequently to the income statement 5 10 (8) Items that will not be reclassified to the income statement: Re-measurement gains/(losses) on pension and medical schemes 7 (9) (21) Others \u2013  \u2212 1 Income tax credit/(charge) relating to items that will not be reclassified to the income statement 7 (9) (20) Total income tax credit/(charge) relating to components of other comprehensive income1 12 1 (28) 1  Included within total income tax relating to components of other comprehensive income is US$12 million relating to deferred taxes and US$ nil relating to current taxes (2022: US$1 million and US$ nil; 2021: US$(28) million and US$ nil). Recognition and measurement Taxation on the profit/(loss) for the year comprises current and deferred tax. Taxation is recognised in the income statement except to the extent that it relates to items recognised directly in equity or other comprehensive income, in which case the tax effect is also recognised in equity or other comprehensive income. Current tax Deferred tax Royalty-related taxation Current tax is the expected tax on the taxable income for the year, using tax rates and laws enacted or substantively enacted at the reporting date, and any adjustments to tax payable in respect of previous years. Deferred tax is the tax expected to be payable or recoverable on differences between the carrying amounts of assets and liabilities in the financial statements and the corresponding tax bases used in the computation of taxable profit, and is accounted for in accordance with IAS 12/AASB 112 \u2018Income Taxes\u2019 (IAS 12). Deferred tax is generally provided on temporary differences arising between the tax bases of assets and liabilities and their carrying amounts in the Financial Statements. Deferred tax assets are recognised to the extent that it is probable that future taxable profits will be available against which the temporary differences can be utilised. Deferred tax is not recognised for temporary differences relating to: \u2013  initial recognition of goodwill \u2013  initial recognition of assets or liabilities in a transaction that is not a business combination and that affects neither accounting nor taxable profit, except where the transaction gives rise to equal and offsetting taxable and deductible temporary differences \u2013  investment in subsidiaries, associates and jointly controlled entities where the Group is able to control the timing of the reversal of the temporary difference and it is probable that they will not reverse in the foreseeable future Deferred tax is measured at the tax rates that are expected to be applied when the asset is realised or the liability is settled, based on the laws that have been enacted or substantively enacted at the reporting date. Current and deferred tax assets and liabilities are offset when the Group has a legally enforceable right to offset and when the tax balances are related to taxes levied by the same tax authority and the Group intends to settle on a net basis, or realise the asset and settle the liability simultaneously. The carrying amount of deferred tax assets is reviewed at each reporting date and reduced to the extent that it is no longer probable that sufficient taxable profits will be available to allow all or part of the asset to be recovered. Royalties are treated as taxation arrangements (impacting income tax expense/(benefit)) when they are imposed under government authority and the amount payable is calculated by reference to revenue derived (net of any allowable deductions) after adjustment for temporary differences. Obligations arising from royalty arrangements that do not satisfy these criteria are recognised as current liabilities and included in expenses. International Tax Reform \u2013 Pillar Two Model Rules The Organisation for Economic Co-operation and Development (OECD)/G20 Inclusive Framework on Base Erosion and Profit Shifting published the Pillar Two model rules designed to address the tax challenges arising from the digitalisation of the global economy. It is unclear if the Pillar Two model rules create additional temporary differences, whether to remeasure deferred taxes for the Pillar Two model rules and which tax rate to use to measure deferred taxes. In response to this uncertainty, on 23 May 2023 and 27 June 2023, respectively, the IASB and AASB issued amendments to IAS 12 \u2018Income taxes\u2019 introducing a mandatory temporary exception to the requirements of IAS 12 under which a company does not recognise or disclose information about deferred tax assets and liabilities related to the proposed OECD/G20 BEPS Pillar Two model rules. The Group applied the temporary exception at 30 June 2023. Uncertain tax and royalty matters The Group operates across many tax jurisdictions. Application of tax law can be complex and requires judgement to assess risk and estimate outcomes. These judgements are subject to risk and uncertainty, hence there is a possibility that changes in circumstances will alter expectations, which may impact the amount of tax assets and tax liabilities, including deferred tax, recognised on the balance sheet and the amount of other tax losses and temporary differences not yet recognised. The evaluation of tax risks considers both amended assessments received and potential sources of challenge from tax authorities. The status of proceedings for these matters will impact the ability to determine the potential exposure and in some cases, it may not be possible to determine a range of possible outcomes or a reliable estimate of the potential exposure. Tax and royalty matters with uncertain outcomes arise in the normal course of business and occur due to changes in tax law, changes in interpretation of tax law, periodic challenges and disagreements with tax authorities and legal proceedings. Tax and royalty obligations assessed as having probable future economic outflows capable of reliable measurement are provided for as at 30 June 2023. Matters with a possible economic outflow and/or presently incapable of being measured reliably are contingent liabilities and disclosed in note 34 \u2018Contingent liabilities\u2019. Details of uncertain tax and royalty matters relating to Samarco are disclosed in note 4 \u2018Significant events \u2013 Samarco dam failure\u2019. Key judgements and estimates Income tax classification Judgements: The Group\u2019s accounting policy for taxation, including royalty-related taxation, requires management\u2019s judgement as to the types of arrangements considered to be a tax on income in contrast to an operating cost. Deferred tax Judgements: Judgement is required in: \u2013   determining the amount of deferred tax assets to be recognised based on the likely timing and the level of future taxable profits; \u2013   assessing whether changes in tax regimes or applicable tax rates are substantively enacted at the reporting date; \u2013   recognising deferred tax liabilities arising from temporary differences in investments. These deferred tax liabilities caused principally by retained earnings held in foreign tax jurisdictions are recognised unless repatriation of retained earnings can be controlled and is not expected to occur in the foreseeable future. In FY2023, judgement was applied in determining the Chilean Royalty Bill was substantively enacted at the reporting date. It was considered that the process of enactment was complete and the remaining steps for enactment would not change the outcome of the tax rates to be applied in measuring the deferred tax assets and liabilities. Estimates: The Group assesses the recoverability of recognised and unrecognised deferred taxes, including losses in Australia, the United States and Canada on a consistent basis. Estimates and assumptions relating to projected earnings and cash flows as applied in the Group impairment process are used for operating assets. These forecasts are also used to estimate the royalty related tax rates to apply when the deferred tax assets are realised and deferred tax liabilities are settled, in revaluing the deferred tax balances following the substantive enactment of the Chilean Royalty Bill. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-757": {
   "value": "Recognition and measurement Taxation on the profit/(loss) for the year comprises current and deferred tax. Taxation is recognised in the income statement except to the extent that it relates to items recognised directly in equity or other comprehensive income, in which case the tax effect is also recognised in equity or other comprehensive income. Current tax Deferred tax Royalty-related taxation Current tax is the expected tax on the taxable income for the year, using tax rates and laws enacted or substantively enacted at the reporting date, and any adjustments to tax payable in respect of previous years. Deferred tax is the tax expected to be payable or recoverable on differences between the carrying amounts of assets and liabilities in the financial statements and the corresponding tax bases used in the computation of taxable profit, and is accounted for in accordance with IAS 12/AASB 112 \u2018Income Taxes\u2019 (IAS 12). Deferred tax is generally provided on temporary differences arising between the tax bases of assets and liabilities and their carrying amounts in the Financial Statements. Deferred tax assets are recognised to the extent that it is probable that future taxable profits will be available against which the temporary differences can be utilised. Deferred tax is not recognised for temporary differences relating to: \u2013  initial recognition of goodwill \u2013  initial recognition of assets or liabilities in a transaction that is not a business combination and that affects neither accounting nor taxable profit, except where the transaction gives rise to equal and offsetting taxable and deductible temporary differences \u2013  investment in subsidiaries, associates and jointly controlled entities where the Group is able to control the timing of the reversal of the temporary difference and it is probable that they will not reverse in the foreseeable future Deferred tax is measured at the tax rates that are expected to be applied when the asset is realised or the liability is settled, based on the laws that have been enacted or substantively enacted at the reporting date. Current and deferred tax assets and liabilities are offset when the Group has a legally enforceable right to offset and when the tax balances are related to taxes levied by the same tax authority and the Group intends to settle on a net basis, or realise the asset and settle the liability simultaneously. The carrying amount of deferred tax assets is reviewed at each reporting date and reduced to the extent that it is no longer probable that sufficient taxable profits will be available to allow all or part of the asset to be recovered. Royalties are treated as taxation arrangements (impacting income tax expense/(benefit)) when they are imposed under government authority and the amount payable is calculated by reference to revenue derived (net of any allowable deductions) after adjustment for temporary differences. Obligations arising from royalty arrangements that do not satisfy these criteria are recognised as current liabilities and included in expenses. International Tax Reform \u2013 Pillar Two Model Rules The Organisation for Economic Co-operation and Development (OECD)/G20 Inclusive Framework on Base Erosion and Profit Shifting published the Pillar Two model rules designed to address the tax challenges arising from the digitalisation of the global economy. It is unclear if the Pillar Two model rules create additional temporary differences, whether to remeasure deferred taxes for the Pillar Two model rules and which tax rate to use to measure deferred taxes. In response to this uncertainty, on 23 May 2023 and 27 June 2023, respectively, the IASB and AASB issued amendments to IAS 12 \u2018Income taxes\u2019 introducing a mandatory temporary exception to the requirements of IAS 12 under which a company does not recognise or disclose information about deferred tax assets and liabilities related to the proposed OECD/G20 BEPS Pillar Two model rules. The Group applied the temporary exception at 30 June 2023. Uncertain tax and royalty matters The Group operates across many tax jurisdictions. Application of tax law can be complex and requires judgement to assess risk and estimate outcomes. These judgements are subject to risk and uncertainty, hence there is a possibility that changes in circumstances will alter expectations, which may impact the amount of tax assets and tax liabilities, including deferred tax, recognised on the balance sheet and the amount of other tax losses and temporary differences not yet recognised. The evaluation of tax risks considers both amended assessments received and potential sources of challenge from tax authorities. The status of proceedings for these matters will impact the ability to determine the potential exposure and in some cases, it may not be possible to determine a range of possible outcomes or a reliable estimate of the potential exposure. Tax and royalty matters with uncertain outcomes arise in the normal course of business and occur due to changes in tax law, changes in interpretation of tax law, periodic challenges and disagreements with tax authorities and legal proceedings. Tax and royalty obligations assessed as having probable future economic outflows capable of reliable measurement are provided for as at 30 June 2023. Matters with a possible economic outflow and/or presently incapable of being measured reliably are contingent liabilities and disclosed in note 34 \u2018Contingent liabilities\u2019. Details of uncertain tax and royalty matters relating to Samarco are disclosed in note 4 \u2018Significant events \u2013 Samarco dam failure\u2019. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDeferredIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-735": {
   "value": "Recognition and measurement Taxation on the profit/(loss) for the year comprises current and deferred tax. Taxation is recognised in the income statement except to the extent that it relates to items recognised directly in equity or other comprehensive income, in which case the tax effect is also recognised in equity or other comprehensive income. Current tax Deferred tax Royalty-related taxation Current tax is the expected tax on the taxable income for the year, using tax rates and laws enacted or substantively enacted at the reporting date, and any adjustments to tax payable in respect of previous years. Deferred tax is the tax expected to be payable or recoverable on differences between the carrying amounts of assets and liabilities in the financial statements and the corresponding tax bases used in the computation of taxable profit, and is accounted for in accordance with IAS 12/AASB 112 \u2018Income Taxes\u2019 (IAS 12). Deferred tax is generally provided on temporary differences arising between the tax bases of assets and liabilities and their carrying amounts in the Financial Statements. Deferred tax assets are recognised to the extent that it is probable that future taxable profits will be available against which the temporary differences can be utilised. Deferred tax is not recognised for temporary differences relating to: \u2013  initial recognition of goodwill \u2013  initial recognition of assets or liabilities in a transaction that is not a business combination and that affects neither accounting nor taxable profit, except where the transaction gives rise to equal and offsetting taxable and deductible temporary differences \u2013  investment in subsidiaries, associates and jointly controlled entities where the Group is able to control the timing of the reversal of the temporary difference and it is probable that they will not reverse in the foreseeable future Deferred tax is measured at the tax rates that are expected to be applied when the asset is realised or the liability is settled, based on the laws that have been enacted or substantively enacted at the reporting date. Current and deferred tax assets and liabilities are offset when the Group has a legally enforceable right to offset and when the tax balances are related to taxes levied by the same tax authority and the Group intends to settle on a net basis, or realise the asset and settle the liability simultaneously. The carrying amount of deferred tax assets is reviewed at each reporting date and reduced to the extent that it is no longer probable that sufficient taxable profits will be available to allow all or part of the asset to be recovered. Royalties are treated as taxation arrangements (impacting income tax expense/(benefit)) when they are imposed under government authority and the amount payable is calculated by reference to revenue derived (net of any allowable deductions) after adjustment for temporary differences. Obligations arising from royalty arrangements that do not satisfy these criteria are recognised as current liabilities and included in expenses. International Tax Reform \u2013 Pillar Two Model Rules The Organisation for Economic Co-operation and Development (OECD)/G20 Inclusive Framework on Base Erosion and Profit Shifting published the Pillar Two model rules designed to address the tax challenges arising from the digitalisation of the global economy. It is unclear if the Pillar Two model rules create additional temporary differences, whether to remeasure deferred taxes for the Pillar Two model rules and which tax rate to use to measure deferred taxes. In response to this uncertainty, on 23 May 2023 and 27 June 2023, respectively, the IASB and AASB issued amendments to IAS 12 \u2018Income taxes\u2019 introducing a mandatory temporary exception to the requirements of IAS 12 under which a company does not recognise or disclose information about deferred tax assets and liabilities related to the proposed OECD/G20 BEPS Pillar Two model rules. The Group applied the temporary exception at 30 June 2023. Uncertain tax and royalty matters The Group operates across many tax jurisdictions. Application of tax law can be complex and requires judgement to assess risk and estimate outcomes. These judgements are subject to risk and uncertainty, hence there is a possibility that changes in circumstances will alter expectations, which may impact the amount of tax assets and tax liabilities, including deferred tax, recognised on the balance sheet and the amount of other tax losses and temporary differences not yet recognised. The evaluation of tax risks considers both amended assessments received and potential sources of challenge from tax authorities. The status of proceedings for these matters will impact the ability to determine the potential exposure and in some cases, it may not be possible to determine a range of possible outcomes or a reliable estimate of the potential exposure. Tax and royalty matters with uncertain outcomes arise in the normal course of business and occur due to changes in tax law, changes in interpretation of tax law, periodic challenges and disagreements with tax authorities and legal proceedings. Tax and royalty obligations assessed as having probable future economic outflows capable of reliable measurement are provided for as at 30 June 2023. Matters with a possible economic outflow and/or presently incapable of being measured reliably are contingent liabilities and disclosed in note 34 \u2018Contingent liabilities\u2019. Details of uncertain tax and royalty matters relating to Samarco are disclosed in note 4 \u2018Significant events \u2013 Samarco dam failure\u2019. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-623": {
   "value": "7 <span class=\"_ _47\"> </span>Earnings per share<span class=\"_ _39c\"> </span>2023<span class=\"_ _203\"> </span><span class=\"ff70\">2022<span class=\"_ _203\"> </span>2021<span class=\"_ _39c\"> </span></span>Earnings attributable to BHP shareholders (US$M)<span class=\"_ _39c\"> </span>\u2013 Continuing operations<span class=\"_ _2ac\"> </span><span class=\"ff6f\">12,921<span class=\"_ _242\"> </span><span class=\"ff70\">20,245<span class=\"_ _206\"> </span>1<span class=\"_ _2\"></span>1,529<span class=\"_ _39c\"> </span></span></span>\u2013 T<span class=\"_ _50\"></span>otal<span class=\"_ _2ad\"> </span><span class=\"ff6f\">12,921<span class=\"_ _242\"> </span><span class=\"ff70\">30,900<span class=\"_ _206\"> </span>1<span class=\"_ _2\"></span>1,304<span class=\"_ _39c\"> </span></span></span>Weighted average number of shares (Million)<span class=\"_ _39c\"> </span>\u2013 Basic<span class=\"_ _2ae\"> </span><span class=\"ff6f\">5,064<span class=\"_ _64\"> </span><span class=\"ff70\">5,061<span class=\"_ _64\"> </span>5,057<span class=\"_ _39c\"> </span></span></span>\u2013 Diluted<span class=\"_ _2af\"> </span><span class=\"ff6f\">5,073<span class=\"_ _64\"> </span><span class=\"ff70\">5,071<span class=\"_ _64\"> </span>5,068<span class=\"_ _39c\"> </span></span></span>Basic earnings per ordinary share (US cents)<span class=\"_ _39c\"> </span>\u2013 Continuing operations<span class=\"_ _2b0\"> </span><span class=\"ff6f\">255.2<span class=\"_ _64\"> </span><span class=\"ff70\">400.0<span class=\"_ _64\"> </span>228.0<span class=\"_ _39c\"> </span></span></span>\u2013 T<span class=\"_ _50\"></span>otal<span class=\"_ _2b1\"> </span><span class=\"ff6f\">255.2<span class=\"_ _64\"> </span><span class=\"ff70\">610.6<span class=\"_ _64\"> </span>223.5<span class=\"_ _39c\"> </span></span></span>Diluted earnings per ordinary share (US cents)<span class=\"_ _39c\"> </span>\u2013 Continuing operations<span class=\"_ _2b0\"> </span><span class=\"ff6f\">254.7<span class=\"_ _64\"> </span><span class=\"ff70\">399.2<span class=\"_ _64\"> </span>227.5<span class=\"_ _39c\"> </span></span></span>\u2013 T<span class=\"_ _50\"></span>otal<span class=\"_ _2b1\"> </span><span class=\"ff6f\">254.7<span class=\"_ _64\"> </span><span class=\"ff70\">609.3<span class=\"_ _64\"> </span>223.0<span class=\"_ _39c\"> </span></span></span>Headline earnings per ordinary share (US cents)<span class=\"_ _39c\"> </span>\u2013 Basic<span class=\"_ _2ae\"> </span><span class=\"ff6f\">256.1<span class=\"_ _64\"> </span><span class=\"ff70\">439.0<span class=\"_ _64\"> </span>284.8<span class=\"_ _39c\"> </span></span></span>\u2013 Diluted<span class=\"_ _2af\"> </span><span class=\"ff6f\">255.7<span class=\"_ _64\"> </span><span class=\"ff70\">438.1<span class=\"_ _64\"> </span>284.2<span class=\"_ _39c\"> </span></span></span>Refer to note 28 \u2018Discontinued operations\u2019<span class=\"_ _2\"></span> for basic earnings per share and diluted earnings per share for Discontinued operations.<span class=\"_ _39c\"> </span>Earnings on <span class=\"_ _2\"></span>American Depositary Shares represent twice the earnings for BHP Group Limited ordinary shares.<span class=\"_ _39c\"> </span>Headline earnings is a Johannesburg Stock Exchange defined performance measure and is reconciled from earnings attributable to ordinary shareholders as follows:<span class=\"_ _39c\"> </span>2023 <span class=\"_ _2\"></span> US$M<span class=\"_ _39c\"> </span>2022 <span class=\"_ _2\"></span> US$M<span class=\"_ _39c\"> </span>2021 <span class=\"_ _2\"></span> US$M<span class=\"_ _39c\"> </span>Earnings attributable to BHP shareholders<span class=\"_ _141\"> </span>12,921<span class=\"_ _1c\"> </span><span class=\"ff70\">30,900<span class=\"_ _1a\"> </span>1<span class=\"_ _2\"></span>1,304<span class=\"_ _39c\"> </span></span>Adjusted for:<span class=\"_ _39c\"> </span>(Gain)/loss on sales of PP&amp;E, Investments and Operations<span class=\"_ _39c\"> </span>1<span class=\"_ _39c\"> </span>(9)<span class=\"_ _b5\"> </span><span class=\"ff70\">(95)<span class=\"_ _10d\"> </span>(50)<span class=\"_ _39c\"> </span></span>Impairments of property<span class=\"_ _2\"></span>, plant and equipment, financial assets and intangibles<span class=\"_ _24b\"> </span><span class=\"ff6f\">75<span class=\"_ _25\"> </span><span class=\"ff70\">515<span class=\"_ _64\"> </span>2,633<span class=\"_ _39c\"> </span></span></span>Samarco impairment expense<span class=\"_ _2b2\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _55\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _1fb\"> </span></span></span><span class=\"lsd3 ws102\">111<span class=\"_ _39c\"> </span></span>Cerrej\u03ccn impairment expense<span class=\"_ _2b3\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _55\"> </span></span> \u2212<span class=\"_ _25\"> </span><span class=\"ff70\">466<span class=\"_ _39c\"> </span></span>Gain on disposal of BHP Mitsui Coal<span class=\"_ _2b4\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _9c\"> </span></span>(840)<span class=\"_ _b0\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _39c\"> </span></span>Gain on merger of Petroleum<span class=\"_ _2b5\"> </span><span class=\"ff6f\">\u2013<span class=\"_ _12a\"> </span></span>(8,167)<span class=\"_ _b0\"> </span><span class=\"ff71\"> \u2212<span class=\"_ _39c\"> </span></span>T<span class=\"_ _2a\"></span>ax effect of above adjustments<span class=\"_ _281\"> </span><span class=\"ff6f\">(17)<span class=\"_ _10d\"> </span></span>(97)<span class=\"_ _b5\"> </span>(60)<span class=\"_ _39c\"> </span>Subtotal of adjustments<span class=\"_ _2b6\"> </span><span class=\"ff6f\">49<span class=\"_ _12a\"> </span></span>(8,684)<span class=\"_ _b8\"> </span>3,100<span class=\"_ _39c\"> </span>Headline earnings<span class=\"_ _294\"> </span>12,970<span class=\"_ _242\"> </span><span class=\"ff70\">22,216<span class=\"_ _1c\"> </span>14,404<span class=\"_ _39c\"> </span></span>Diluted headline earnings<span class=\"_ _12f\"> </span>12,970<span class=\"_ _1c\"> </span><span class=\"ff70\">22,216<span class=\"_ _1c\"> </span>14,404<span class=\"_ _39c\"> </span></span>1 <span class=\"_ _42\"> </span>Included in other income.<span class=\"_ _39c\"> </span>Recognition and measurement<span class=\"_ _39c\"> </span>Diluted earnings attributable to BHP shareholders are equal to the earnings attributable to BHP shareholders.<span class=\"_ _39c\"> </span>Prior to the Group\u2019s corporate structure unification, the calculation of the number of ordinary shares used in the computation of basic earnings per share was the aggregate of the weighted average number of ordinary shares of BHP Group Limited and BHP Group Plc outstanding during the period after deduction of the number of shares held by the Billiton Employee Share Ownership T<span class=\"_ _2\"></span>rust and the BHP Group Limited Employee Equity <span class=\"_ _2\"></span>Trust (previously known as \u2018BHP Billiton Limited Employee Equity <span class=\"_ _2\"></span>Trust\u2019). Ef<span class=\"_ _2\"></span>fective from 31 January 2022, the aggregate of the weighted average number of ordinary shares of only BHP Group Limited is considered in the computation of basic earnings per share. Refer to note 17 \u2018Share capital\u2019<span class=\"_ _2\"></span> for details on unification.<span class=\"_ _39c\"> </span>For the purposes of calculating diluted earnings per share, the effect of 9 million dilutive shares has been taken into account for the year ended 30 June 2023 (2022: 10 million shares; 2021: 1<span class=\"_ _2\"></span>1 million shares). <span class=\"_ _2\"></span>The Group\u2019s only potential dilutive ordinary shares are share awards granted under the employee share ownership plans for which terms and conditions are described in note 26 \u2018Employee share ownership plans\u2019. Diluted earnings per share calculation excludes instruments which are considered antidilutive.<span class=\"_ _39c\"> </span>At 30 June 2023, there are no instruments which are considered antidilutive (2022: nil; 2021: nil). ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEarningsPerShareExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-736": {
   "value": "Recognition and measurement Diluted earnings attributable to BHP shareholders are equal to the earnings attributable to BHP shareholders. Prior to the Group\u2019s corporate structure unification, the calculation of the number of ordinary shares used in the computation of basic earnings per share was the aggregate of the weighted average number of ordinary shares of BHP Group Limited and BHP Group Plc outstanding during the period after deduction of the number of shares held by the Billiton Employee Share Ownership Trust and the BHP Group Limited Employee Equity Trust (previously known as \u2018BHP Billiton Limited Employee Equity Trust\u2019). Effective from 31 January 2022, the aggregate of the weighted average number of ordinary shares of only BHP Group Limited is considered in the computation of basic earnings per share. Refer to note 17 \u2018Share capital\u2019 for details on unification. For the purposes of calculating diluted earnings per share, the effect of 9 million dilutive shares has been taken into account for the year ended 30 June 2023 (2022: 10 million shares; 2021: 11 million shares). The Group\u2019s only potential dilutive ordinary shares are share awards granted under the employee share ownership plans for which terms and conditions are described in note 26 \u2018Employee share ownership plans\u2019. Diluted earnings per share calculation excludes instruments which are considered antidilutive. At 30 June 2023, there are no instruments which are considered antidilutive (2022: nil; 2021: nil).",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForEarningsPerShareExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-624": {
   "value": "8  Trade and other receivables 2023  US$M 2022  US$M Trade receivables 3,418 4,411 Other receivables1 1,324 1,168 Total  4,742 5,579 Comprising: Current 4,594 5,426 Non-current 148 153 1  Other receivables mainly relate to indirect tax refunds and receivables from joint venture partners. Recognition and measurement Trade receivables are recognised initially at their transaction price or, for those receivables containing a significant financing component, at fair value. Trade receivables are subsequently measured at amortised cost using the effective interest method, less an allowance for impairment, except for provisionally priced receivables which are subsequently measured at fair value through profit or loss under IFRS 9. The collectability of trade and other receivables is assessed continuously. At the reporting date, specific allowances are made for any expected credit losses based on a review of all outstanding amounts at reporting period-end. Individual receivables are written off when management deems them unrecoverable. The net carrying amount of trade and other receivables approximates their fair values. Credit risk Trade receivables generally have terms of less than 30 days. The Group has no material concentration of credit risk with any single counterparty and is not dominantly exposed to any individual industry. Credit risk can arise from the non-performance by counterparties of their contractual financial obligations towards the Group. To manage credit risk, the Group maintains Group-wide procedures covering the application for credit approvals, granting and renewal of counterparty limits, proactive monitoring of exposures against these limits and requirements triggering secured payment terms. As part of these processes, the credit exposures with all counterparties are regularly monitored and assessed on a timely basis. The credit quality of the Group\u2019s customers is reviewed and the solvency of each debtor and their ability to pay the receivable is considered in assessing receivables for impairment. The 10 largest customers represented 31 per cent (2022: 34 per cent) of total credit risk exposures managed by the Group. Receivables are deemed to be past due or impaired in accordance with the Group\u2019s terms and conditions. These terms and conditions are determined on a case-by-case basis with reference to the customer\u2019s credit quality, payment performance and prevailing market conditions. As at 30 June 2023, trade receivables of US$8 million (2022: US$103 million) were past due but not impaired. The majority of these receivables were less than 30 days overdue. At 30 June 2023, trade receivables are stated net of provisions for expected credit losses of US$9 million (2022: US$3 million). ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTradeAndOtherReceivablesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-737": {
   "value": "Recognition and measurement Trade receivables are recognised initially at their transaction price or, for those receivables containing a significant financing component, at fair value. Trade receivables are subsequently measured at amortised cost using the effective interest method, less an allowance for impairment, except for provisionally priced receivables which are subsequently measured at fair value through profit or loss under IFRS 9. The collectability of trade and other receivables is assessed continuously. At the reporting date, specific allowances are made for any expected credit losses based on a review of all outstanding amounts at reporting period-end. Individual receivables are written off when management deems them unrecoverable. The net carrying amount of trade and other receivables approximates their fair values. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForTradeAndOtherReceivablesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-661": {
   "value": "Credit risk Trade receivables generally have terms of less than 30 days. The Group has no material concentration of credit risk with any single counterparty and is not dominantly exposed to any individual industry. Credit risk can arise from the non-performance by counterparties of their contractual financial obligations towards the Group. To manage credit risk, the Group maintains Group-wide procedures covering the application for credit approvals, granting and renewal of counterparty limits, proactive monitoring of exposures against these limits and requirements triggering secured payment terms. As part of these processes, the credit exposures with all counterparties are regularly monitored and assessed on a timely basis. The credit quality of the Group\u2019s customers is reviewed and the solvency of each debtor and their ability to pay the receivable is considered in assessing receivables for impairment. The 10 largest customers represented 31 per cent (2022: 34 per cent) of total credit risk exposures managed by the Group. Receivables are deemed to be past due or impaired in accordance with the Group\u2019s terms and conditions. These terms and conditions are determined on a case-by-case basis with reference to the customer\u2019s credit quality, payment performance and prevailing market conditions. As at 30 June 2023, trade receivables of US$8 million (2022: US$103 million) were past due but not impaired. The majority of these receivables were less than 30 days overdue. At 30 June 2023, trade receivables are stated net of provisions for expected credit losses of US$9 million (2022: US$3 million). Credit risk Credit risk is the risk that a counterparty will not meet its obligations under a financial instrument or customer contract, leading to a financial loss. The Group is exposed to credit risk from its operating activities (primarily from customer receivables) and from its financing activities, including deposits with banks and financial institutions, other short-term investments, interest rate and currency derivative contracts and other financial instruments. Refer to note 8 \u2018Trade and other receivables\u2019 and note 21 \u2018Net debt\u2019 for details on the Group credit risk. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCreditRiskExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-696": {
   "value": "Trade receivables generally have terms of less than 30 days. The Group has no material concentration of credit risk with any single counterparty and is not dominantly exposed to any individual industry. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCreditRiskExposureExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-697": {
   "value": "Credit risk can arise from the non-performance by counterparties of their contractual financial obligations towards the Group. To manage credit risk, the Group maintains Group-wide procedures covering the application for credit approvals, granting and renewal of counterparty limits, proactive monitoring of exposures against these limits and requirements triggering secured payment terms. As part of these processes, the credit exposures with all counterparties are regularly monitored and assessed on a timely basis. The credit quality of the Group\u2019s customers is reviewed and the solvency of each debtor and their ability to pay the receivable is considered in assessing receivables for impairment. ",
   "dimensions": {
    "concept": "ifrs-full:ExplanationOfCreditRiskManagementPracticesAndHowTheyRelateToRecognitionAndMeasurementOfExpectedCreditLossesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-698": {
   "value": "Receivables are deemed to be past due or impaired in accordance with the Group\u2019s terms and conditions. These terms and conditions are determined on a case-by-case basis with reference to the customer\u2019s credit quality, payment performance and prevailing market conditions. As at 30 June 2023, trade receivables of US$8 million (2022: US$103 million) were past due but not impaired. The majority of these receivables were less than 30 days overdue. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialAssetsThatAreEitherPastDueOrImpairedExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-699": {
   "value": "At 30 June 2023, trade receivables are stated net of provisions for expected credit losses of US$9 million (2022: US$3 million). ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAllowanceForCreditLossesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-625": {
   "value": "9  Trade and other payables 2023  US$M 2022  US$M Trade payables 4,893 5,360 Other payables 1,407 1,327 Total 6,300 6,687 Comprising: Current 6,296 6,687 Non-current 4  \u2212 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTradeAndOtherPayablesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-626": {
   "value": "10 Inventories 2023  US$M 2022  US$M Definitions Raw materials and consumables 2,106 1,713 Spares, consumables and other supplies yet to be utilised in the production process or in the rendering of services. Work in progress 3,514 3,827 Commodities currently in the production process that require further processing by the Group to a saleable form. Finished goods 1,003 710 Commodities ready-for-sale and not requiring further processing by the Group. Total1 6,623 6,250 Comprising: Inventories classified as non-current are not expected to be utilised or sold within 12 months after the reporting date or within the operating cycle of the business. Current 5,220 4,935 Non-current 1,403 1,315 1  Inventory write-downs of US$100 million were recognised during the year (2022: US$163 million; 2021: US$58 million). Inventory write-downs of US$37 million made in previous periods were reversed during the year (2022: US$23 million; 2021: US$26 million). Recognition and measurement Regardless of the type of inventory and its stage in the production process, inventories are valued at the lower of cost and net realisable value. Cost is determined primarily on the basis of average costs and involves estimates of expected metal recoveries and work in progress volumes, calculated using available industry, engineering and scientific data. These estimates are periodically reassessed by the Group taking into account technical analysis and historical performance. For processed inventories, cost is derived on an absorption costing basis. Cost comprises costs of purchasing raw materials and costs of production, including attributable mining and manufacturing overheads taking into consideration normal operating capacity. Inventory quantities are assessed primarily through surveys and assays. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInventoriesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-738": {
   "value": "Recognition and measurement Regardless of the type of inventory and its stage in the production process, inventories are valued at the lower of cost and net realisable value. Cost is determined primarily on the basis of average costs and involves estimates of expected metal recoveries and work in progress volumes, calculated using available industry, engineering and scientific data. These estimates are periodically reassessed by the Group taking into account technical analysis and historical performance. For processed inventories, cost is derived on an absorption costing basis. Cost comprises costs of purchasing raw materials and costs of production, including attributable mining and manufacturing overheads taking into consideration normal operating capacity. Inventory quantities are assessed primarily through surveys and assays. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForMeasuringInventories",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-627": {
   "value": "11  Property, plant and equipment Land and buildings US$M Plant and equipment US$M Other mineral assets  US$M Assets under construction US$M Exploration and evaluation US$M Total  US$M Net book value \u2013 30 June 2023 At the beginning of the financial year  8,079 35,500 8,494 9,031 191 61,295 Additions1 194 1,024 842 6,332 56 8,448 Acquisition of subsidiaries and operations 2 88 2,256 4,612 720 \u2013 7,676 Remeasurements of index-linked freight contracts 3 \u2013 53 \u2013 \u2013 \u2013 53 Depreciation for the year (586) (4,156) (225) \u2013 \u2013 (4,967) Impairments for the year4 \u2013 (73) \u2013 \u2013 \u2013 (73) Disposals (2) (6) \u2013 \u2013 \u2013 (8) Transfers and other movements 367 2,056 (419) (2,602) (8) (606) At the end of the financial year5 8,140 36,654 13,304 13,481 239 71,818 \u2013 Cost 15,258 85,394 19,420 14,245 1,029 135,346 \u2013 Accumulated depreciation and impairments (7,118) (48,740) (6,116) (764) (790) (63,528) Net book value \u2013 30 June 2022 At the beginning of the financial year  8,072 44,682 8,941 10,432 1,686 73,813 Additions1 41 1,935 792 5,872 137 8,777 Remeasurements of index-linked freight contracts 3 \u2212 (369)  \u2212  \u2212  \u2212 (369) Depreciation for the year (663) (5,564) (276)  \u2212  \u2212 (6,503) Impairments for the year4 (14) (499) (2)  \u2212  \u2212 (515) Disposals (3) (22)  \u2212  \u2212  \u2212 (25) Divestment and demerger of subsidiaries and operations6 (448) (8,007) (545) (3,549) (842) (13,391) Transfers and other movements 1,094 3,344 (416) (3,724) (790) (492) At the end of the financial year 5 8,079 35,500 8,494 9,031 191 61,295 \u2013 Cost 14,823 81,218 14,353 9,755 981 121,130 \u2013 Accumulated depreciation and impairments (6,744) (45,718) (5,859) (724) (790) (59,835) 1  Includes change in estimates and net foreign exchange gains/(losses) related to the closure and rehabilitation provisions for operating sites. Refer to note 15 \u2018Closure and rehabilitation provisions\u2019. 2  Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019 for more information. 3  Relates to remeasurements of index-linked freight contracts including continuous voyage charters (CVCs). Refer to note 22 \u2018Leases\u2019. 4  Refer to note 13 \u2018Impairment of non-current assets\u2019 for information on impairments. 5  Includes the carrying value of the Group\u2019s right-of-use assets relating to land and buildings and plant and equipment of US$2,809 million (2022: US$2,361 million). Refer to note 22 \u2018Leases\u2019 for the movement of the right-of-use assets. 6  BMC and Petroleum were disposed in May 2022 and June 2022 respectively. Refer to notes 3 \u2018Exceptional items\u2019 and 28 \u2018Discontinued operations\u2019 for more information. Recognition and measurement Property, plant and equipment Property, plant and equipment is recorded at cost less accumulated depreciation and impairment charges. Cost is the fair value of consideration given to acquire the asset at the time of its acquisition or construction and includes the direct costs of bringing the asset to the location and the condition necessary for operation and the estimated future costs of closure and rehabilitation of the facility. Right-of-use assets are measured at cost, less any accumulated depreciation and impairment losses, and adjusted for any remeasurement of lease liabilities. Refer to note 22 \u2018Leases\u2019 for further details. Right-of-use assets are presented within the category of property, plant and equipment according to the nature of the underlying asset leased. Exploration and evaluation Exploration costs are incurred to discover mineral resources. Evaluation costs are incurred to assess the technical feasibility and commercial viability of resources found. Exploration and evaluation expenditure is charged to the income statement as incurred, except in the following circumstances in which case the expenditure may be capitalised: \u2013  the exploration and evaluation activity is within an area of interest that was previously acquired as an asset acquisition or in a business combination and measured at fair value on acquisition or \u2013  the existence of a commercially viable mineral deposit has been established A regular review of each area of interest is undertaken to determine the appropriateness of continuing to carry forward costs in relation to that area. Capitalised costs are only carried forward to the extent that they are expected to be recovered through the successful exploitation of the area of interest or alternatively by its sale. To the extent that capitalised expenditure is no longer expected to be recovered, it is charged to the income statement. Development expenditure When proven mineral reserves are determined and development is sanctioned, capitalised exploration and evaluation expenditure is reclassified as assets under construction within property, plant and equipment. All subsequent development expenditure is capitalised and classified as assets under construction, provided commercial viability conditions continue to be satisfied. The Group may use funds sourced from external parties to finance the acquisition and development of assets and operations. Finance costs are expensed as incurred, except where they relate to the financing of construction or development of qualifying assets. Borrowing costs directly attributable to acquiring or constructing a qualifying asset are capitalised during the development phase. In the instance where saleable material is extracted prior to the commissioning of a project/site, sale proceeds are recognised as revenue, with associated costs also recognised in the income statement. On completion of development, all assets included in assets under construction are reclassified as either plant and equipment or other mineral assets and depreciation commences. Other mineral assets Other mineral assets comprise: \u2013  capitalised exploration, evaluation and development expenditure for assets in production \u2013  mineral rights acquired \u2013  capitalised development and production stripping costs Overburden removal costs The process of removing overburden and other waste materials to access mineral deposits is referred to as stripping. Stripping is necessary to obtain access to mineral deposits and occurs throughout the life of an open-pit mine. Development and production stripping costs are classified as other mineral assets in property, plant and equipment. Stripping costs are accounted for separately for individual components of an ore body. The determination of components is dependent on the mine plan and other factors, including the size, shape and geotechnical aspects of an ore body. The Group accounts for stripping activities as follows: Development stripping costs These are initial overburden removal costs incurred to obtain access to mineral deposits that will be commercially produced. These costs are capitalised when it is probable that future economic benefits (access to mineral ores) will flow to the Group and costs can be measured reliably. Once the production phase begins, capitalised development stripping costs are depreciated using the units of production method based on the proven and probable reserves of the relevant identified component of the ore body which the initial stripping activity benefits. Production stripping costs These are post initial overburden removal costs incurred during the normal course of production activity, which commences after the first saleable minerals have been extracted from the component. Production stripping costs can give rise to two benefits, the accounting for which is outlined below: Production stripping activity Benefits of stripping activity Extraction of ore (inventory) in current period. Improved access to future ore extraction. Period benefited Current period Future period(s) Recognition and measurement criteria When the benefits of stripping activities are realised in the form of inventory produced; the associated costs are recorded in accordance with the Group\u2019s inventory accounting policy. When the benefits of stripping activities are improved access to future ore; production costs are capitalised when all the following criteria are met: \u2013  the production stripping activity improves access to a specific component of the ore body and it is probable that economic benefits arising from the improved access to future ore production will be realised \u2013  the component of the ore body for which access has been improved can be identified \u2013  costs associated with that component can be measured reliably Allocation of costs Production stripping costs are allocated between the inventory produced and the production stripping asset using a life-of- component waste-to-ore (or mineral contained) strip ratio. When the current strip ratio is greater than the estimated life-of- component ratio a portion of the stripping costs is capitalised to the production stripping asset. Asset recognised from stripping activity Inventory Other mineral assets within property, plant and equipment. Depreciation basis Not applicable  On a component-by-component basis using the units of production method based on proven and probable reserves. Key judgements and estimates Judgements: Judgement is applied by management in determining the components of an ore body. Estimates: Estimates are used in the determination of stripping ratios and mineral reserves by component. Changes to estimates related to life- of-component waste-to-ore (or mineral contained) strip ratios and the expected ore production from identified components are accounted for prospectively and may affect depreciation rates and asset carrying values. Depreciation Depreciation of assets, other than land, assets under construction and capitalised exploration and evaluation that are not depreciated, is calculated using either the straight-line (SL) method or units of production (UoP) method, net of residual values, over the estimated useful lives of specific assets. The depreciation method and rates applied to specific assets reflect the pattern in which the asset\u2019s benefits are expected to be used by the Group. The Group\u2019s proved and probable reserves for minerals assets are used to determine UoP depreciation unless doing so results in depreciation charges that do not reflect the asset\u2019s useful life. Where this occurs, alternative approaches to determining reserves are applied, to provide a phasing of periodic depreciation charges that better reflects the asset\u2019s expected useful life. Where assets are dedicated to a mine lease, the useful lives below are subject to the lesser of the asset category\u2019s useful life and the life of the mine lease, unless those assets are readily transferable to another productive mine. Assets classified as held for sale are measured at the lower of their carrying amount and fair value less cost to sell and therefore not depreciated. Key estimates The determination of useful lives, residual values and depreciation methods involves estimates and assumptions and is reviewed annually. Any changes to useful lives or any other estimates or assumptions, including the expected impact of climate change and the transition to a lower carbon economy, may affect prospective depreciation rates and asset carrying values. The table below summarises the principal depreciation methods and rates applied to major asset categories by the Group. Category Buildings Plant and equipment Mineral rights Capitalised exploration, evaluation and development expenditure Typical depreciation methodology SL SL UoP UoP Depreciation rate 25-50 years 3-30 years Based on the rate of  depletion of reserves Based on the rate of  depletion of reserves Commitments The Group\u2019s commitments for capital expenditure were US$3,975 million as at 30 June 2023 (2022: US$2,820 million). The Group\u2019s commitments related to leases are included in note 22 \u2018Leases\u2019. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfPropertyPlantAndEquipmentExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-662": {
   "value": "Land and buildings US$M Plant and equipment US$M Other mineral assets  US$M Assets under construction US$M Exploration and evaluation US$M Total  US$M Net book value \u2013 30 June 2023 At the beginning of the financial year  8,079 35,500 8,494 9,031 191 61,295 Additions1 194 1,024 842 6,332 56 8,448 Acquisition of subsidiaries and operations 2 88 2,256 4,612 720 \u2013 7,676 Remeasurements of index-linked freight contracts 3 \u2013 53 \u2013 \u2013 \u2013 53 Depreciation for the year (586) (4,156) (225) \u2013 \u2013 (4,967) Impairments for the year4 \u2013 (73) \u2013 \u2013 \u2013 (73) Disposals (2) (6) \u2013 \u2013 \u2013 (8) Transfers and other movements 367 2,056 (419) (2,602) (8) (606) At the end of the financial year5 8,140 36,654 13,304 13,481 239 71,818 \u2013 Cost 15,258 85,394 19,420 14,245 1,029 135,346 \u2013 Accumulated depreciation and impairments (7,118) (48,740) (6,116) (764) (790) (63,528) Net book value \u2013 30 June 2022 At the beginning of the financial year  8,072 44,682 8,941 10,432 1,686 73,813 Additions1 41 1,935 792 5,872 137 8,777 Remeasurements of index-linked freight contracts 3 \u2212 (369)  \u2212  \u2212  \u2212 (369) Depreciation for the year (663) (5,564) (276)  \u2212  \u2212 (6,503) Impairments for the year4 (14) (499) (2)  \u2212  \u2212 (515) Disposals (3) (22)  \u2212  \u2212  \u2212 (25) Divestment and demerger of subsidiaries and operations6 (448) (8,007) (545) (3,549) (842) (13,391) Transfers and other movements 1,094 3,344 (416) (3,724) (790) (492) At the end of the financial year 5 8,079 35,500 8,494 9,031 191 61,295 \u2013 Cost 14,823 81,218 14,353 9,755 981 121,130 \u2013 Accumulated depreciation and impairments (6,744) (45,718) (5,859) (724) (790) (59,835) 1  Includes change in estimates and net foreign exchange gains/(losses) related to the closure and rehabilitation provisions for operating sites. Refer to note 15 \u2018Closure and rehabilitation provisions\u2019. 2  Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019 for more information. 3  Relates to remeasurements of index-linked freight contracts including continuous voyage charters (CVCs). Refer to note 22 \u2018Leases\u2019. 4  Refer to note 13 \u2018Impairment of non-current assets\u2019 for information on impairments. 5  Includes the carrying value of the Group\u2019s right-of-use assets relating to land and buildings and plant and equipment of US$2,809 million (2022: US$2,361 million). Refer to note 22 \u2018Leases\u2019 for the movement of the right-of-use assets. 6  BMC and Petroleum were disposed in May 2022 and June 2022 respectively. Refer to notes 3 \u2018Exceptional items\u2019 and 28 \u2018Discontinued operations\u2019 for more information. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfExplorationAndEvaluationAssetsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-739": {
   "value": "Recognition and measurement Property, plant and equipment Property, plant and equipment is recorded at cost less accumulated depreciation and impairment charges. Cost is the fair value of consideration given to acquire the asset at the time of its acquisition or construction and includes the direct costs of bringing the asset to the location and the condition necessary for operation and the estimated future costs of closure and rehabilitation of the facility. Right-of-use assets are measured at cost, less any accumulated depreciation and impairment losses, and adjusted for any remeasurement of lease liabilities. Refer to note 22 \u2018Leases\u2019 for further details. Right-of-use assets are presented within the category of property, plant and equipment according to the nature of the underlying asset leased. Exploration and evaluation Exploration costs are incurred to discover mineral resources. Evaluation costs are incurred to assess the technical feasibility and commercial viability of resources found. Exploration and evaluation expenditure is charged to the income statement as incurred, except in the following circumstances in which case the expenditure may be capitalised: \u2013  the exploration and evaluation activity is within an area of interest that was previously acquired as an asset acquisition or in a business combination and measured at fair value on acquisition or \u2013  the existence of a commercially viable mineral deposit has been established A regular review of each area of interest is undertaken to determine the appropriateness of continuing to carry forward costs in relation to that area. Capitalised costs are only carried forward to the extent that they are expected to be recovered through the successful exploitation of the area of interest or alternatively by its sale. To the extent that capitalised expenditure is no longer expected to be recovered, it is charged to the income statement. Development expenditure When proven mineral reserves are determined and development is sanctioned, capitalised exploration and evaluation expenditure is reclassified as assets under construction within property, plant and equipment. All subsequent development expenditure is capitalised and classified as assets under construction, provided commercial viability conditions continue to be satisfied. The Group may use funds sourced from external parties to finance the acquisition and development of assets and operations. Finance costs are expensed as incurred, except where they relate to the financing of construction or development of qualifying assets. Borrowing costs directly attributable to acquiring or constructing a qualifying asset are capitalised during the development phase. In the instance where saleable material is extracted prior to the commissioning of a project/site, sale proceeds are recognised as revenue, with associated costs also recognised in the income statement. On completion of development, all assets included in assets under construction are reclassified as either plant and equipment or other mineral assets and depreciation commences. Other mineral assets Other mineral assets comprise: \u2013  capitalised exploration, evaluation and development expenditure for assets in production \u2013  mineral rights acquired \u2013  capitalised development and production stripping costs Overburden removal costs The process of removing overburden and other waste materials to access mineral deposits is referred to as stripping. Stripping is necessary to obtain access to mineral deposits and occurs throughout the life of an open-pit mine. Development and production stripping costs are classified as other mineral assets in property, plant and equipment. Stripping costs are accounted for separately for individual components of an ore body. The determination of components is dependent on the mine plan and other factors, including the size, shape and geotechnical aspects of an ore body. The Group accounts for stripping activities as follows: Development stripping costs These are initial overburden removal costs incurred to obtain access to mineral deposits that will be commercially produced. These costs are capitalised when it is probable that future economic benefits (access to mineral ores) will flow to the Group and costs can be measured reliably. Once the production phase begins, capitalised development stripping costs are depreciated using the units of production method based on the proven and probable reserves of the relevant identified component of the ore body which the initial stripping activity benefits. Production stripping costs These are post initial overburden removal costs incurred during the normal course of production activity, which commences after the first saleable minerals have been extracted from the component. Production stripping costs can give rise to two benefits, the accounting for which is outlined below: Production stripping activity Benefits of stripping activity Extraction of ore (inventory) in current period. Improved access to future ore extraction. Period benefited Current period Future period(s) Recognition and measurement criteria When the benefits of stripping activities are realised in the form of inventory produced; the associated costs are recorded in accordance with the Group\u2019s inventory accounting policy. When the benefits of stripping activities are improved access to future ore; production costs are capitalised when all the following criteria are met: \u2013  the production stripping activity improves access to a specific component of the ore body and it is probable that economic benefits arising from the improved access to future ore production will be realised \u2013  the component of the ore body for which access has been improved can be identified \u2013  costs associated with that component can be measured reliably Allocation of costs Production stripping costs are allocated between the inventory produced and the production stripping asset using a life-of- component waste-to-ore (or mineral contained) strip ratio. When the current strip ratio is greater than the estimated life-of- component ratio a portion of the stripping costs is capitalised to the production stripping asset. Asset recognised from stripping activity Inventory Other mineral assets within property, plant and equipment. Depreciation basis Not applicable  On a component-by-component basis using the units of production method based on proven and probable reserves. Depreciation Depreciation of assets, other than land, assets under construction and capitalised exploration and evaluation that are not depreciated, is calculated using either the straight-line (SL) method or units of production (UoP) method, net of residual values, over the estimated useful lives of specific assets. The depreciation method and rates applied to specific assets reflect the pattern in which the asset\u2019s benefits are expected to be used by the Group. The Group\u2019s proved and probable reserves for minerals assets are used to determine UoP depreciation unless doing so results in depreciation charges that do not reflect the asset\u2019s useful life. Where this occurs, alternative approaches to determining reserves are applied, to provide a phasing of periodic depreciation charges that better reflects the asset\u2019s expected useful life. Where assets are dedicated to a mine lease, the useful lives below are subject to the lesser of the asset category\u2019s useful life and the life of the mine lease, unless those assets are readily transferable to another productive mine. Assets classified as held for sale are measured at the lower of their carrying amount and fair value less cost to sell and therefore not depreciated. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForPropertyPlantAndEquipmentExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-772": {
   "value": "Exploration and evaluation Exploration costs are incurred to discover mineral resources. Evaluation costs are incurred to assess the technical feasibility and commercial viability of resources found. Exploration and evaluation expenditure is charged to the income statement as incurred, except in the following circumstances in which case the expenditure may be capitalised: \u2013  the exploration and evaluation activity is within an area of interest that was previously acquired as an asset acquisition or in a business combination and measured at fair value on acquisition or \u2013  the existence of a commercially viable mineral deposit has been established A regular review of each area of interest is undertaken to determine the appropriateness of continuing to carry forward costs in relation to that area. Capitalised costs are only carried forward to the extent that they are expected to be recovered through the successful exploitation of the area of interest or alternatively by its sale. To the extent that capitalised expenditure is no longer expected to be recovered, it is charged to the income statement. Development expenditure When proven mineral reserves are determined and development is sanctioned, capitalised exploration and evaluation expenditure is reclassified as assets under construction within property, plant and equipment. All subsequent development expenditure is capitalised and classified as assets under construction, provided commercial viability conditions continue to be satisfied. The Group may use funds sourced from external parties to finance the acquisition and development of assets and operations. Finance costs are expensed as incurred, except where they relate to the financing of construction or development of qualifying assets. Borrowing costs directly attributable to acquiring or constructing a qualifying asset are capitalised during the development phase. In the instance where saleable material is extracted prior to the commissioning of a project/site, sale proceeds are recognised as revenue, with associated costs also recognised in the income statement. On completion of development, all assets included in assets under construction are reclassified as either plant and equipment or other mineral assets and depreciation commences. Other mineral assets Other mineral assets comprise: \u2013  capitalised exploration, evaluation and development expenditure for assets in production \u2013  mineral rights acquired \u2013  capitalised development and production stripping costs Overburden removal costs The process of removing overburden and other waste materials to access mineral deposits is referred to as stripping. Stripping is necessary to obtain access to mineral deposits and occurs throughout the life of an open-pit mine. Development and production stripping costs are classified as other mineral assets in property, plant and equipment. Stripping costs are accounted for separately for individual components of an ore body. The determination of components is dependent on the mine plan and other factors, including the size, shape and geotechnical aspects of an ore body. The Group accounts for stripping activities as follows: Development stripping costs These are initial overburden removal costs incurred to obtain access to mineral deposits that will be commercially produced. These costs are capitalised when it is probable that future economic benefits (access to mineral ores) will flow to the Group and costs can be measured reliably. Once the production phase begins, capitalised development stripping costs are depreciated using the units of production method based on the proven and probable reserves of the relevant identified component of the ore body which the initial stripping activity benefits. Production stripping costs These are post initial overburden removal costs incurred during the normal course of production activity, which commences after the first saleable minerals have been extracted from the component. Production stripping costs can give rise to two benefits, the accounting for which is outlined below: Production stripping activity Benefits of stripping activity Extraction of ore (inventory) in current period. Improved access to future ore extraction. Period benefited Current period Future period(s) Recognition and measurement criteria When the benefits of stripping activities are realised in the form of inventory produced; the associated costs are recorded in accordance with the Group\u2019s inventory accounting policy. When the benefits of stripping activities are improved access to future ore; production costs are capitalised when all the following criteria are met: \u2013  the production stripping activity improves access to a specific component of the ore body and it is probable that economic benefits arising from the improved access to future ore production will be realised \u2013  the component of the ore body for which access has been improved can be identified \u2013  costs associated with that component can be measured reliably Allocation of costs Production stripping costs are allocated between the inventory produced and the production stripping asset using a life-of- component waste-to-ore (or mineral contained) strip ratio. When the current strip ratio is greater than the estimated life-of- component ratio a portion of the stripping costs is capitalised to the production stripping asset. Asset recognised from stripping activity Inventory Other mineral assets within property, plant and equipment. Depreciation basis Not applicable  On a component-by-component basis using the units of production method based on proven and probable reserves. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForMiningAssetsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-758": {
   "value": "Exploration and evaluation Exploration costs are incurred to discover mineral resources. Evaluation costs are incurred to assess the technical feasibility and commercial viability of resources found. Exploration and evaluation expenditure is charged to the income statement as incurred, except in the following circumstances in which case the expenditure may be capitalised: \u2013  the exploration and evaluation activity is within an area of interest that was previously acquired as an asset acquisition or in a business combination and measured at fair value on acquisition or \u2013  the existence of a commercially viable mineral deposit has been established A regular review of each area of interest is undertaken to determine the appropriateness of continuing to carry forward costs in relation to that area. Capitalised costs are only carried forward to the extent that they are expected to be recovered through the successful exploitation of the area of interest or alternatively by its sale. To the extent that capitalised expenditure is no longer expected to be recovered, it is charged to the income statement. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForExplorationAndEvaluationExpenditures",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-759": {
   "value": "The Group may use funds sourced from external parties to finance the acquisition and development of assets and operations. Finance costs are expensed as incurred, except where they relate to the financing of construction or development of qualifying assets. Borrowing costs directly attributable to acquiring or constructing a qualifying asset are capitalised during the development phase. In the instance where saleable material is extracted prior to the commissioning of a project/site, sale proceeds are recognised as revenue, with associated costs also recognised in the income statement. On completion of development, all assets included in assets under construction are reclassified as either plant and equipment or other mineral assets and depreciation commences. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForBorrowingCostsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-760": {
   "value": "Overburden removal costs The process of removing overburden and other waste materials to access mineral deposits is referred to as stripping. Stripping is necessary to obtain access to mineral deposits and occurs throughout the life of an open-pit mine. Development and production stripping costs are classified as other mineral assets in property, plant and equipment. Stripping costs are accounted for separately for individual components of an ore body. The determination of components is dependent on the mine plan and other factors, including the size, shape and geotechnical aspects of an ore body. The Group accounts for stripping activities as follows: Development stripping costs These are initial overburden removal costs incurred to obtain access to mineral deposits that will be commercially produced. These costs are capitalised when it is probable that future economic benefits (access to mineral ores) will flow to the Group and costs can be measured reliably. Once the production phase begins, capitalised development stripping costs are depreciated using the units of production method based on the proven and probable reserves of the relevant identified component of the ore body which the initial stripping activity benefits. Production stripping costs These are post initial overburden removal costs incurred during the normal course of production activity, which commences after the first saleable minerals have been extracted from the component. Production stripping costs can give rise to two benefits, the accounting for which is outlined below: Production stripping activity Benefits of stripping activity Extraction of ore (inventory) in current period. Improved access to future ore extraction. Period benefited Current period Future period(s) Recognition and measurement criteria When the benefits of stripping activities are realised in the form of inventory produced; the associated costs are recorded in accordance with the Group\u2019s inventory accounting policy. When the benefits of stripping activities are improved access to future ore; production costs are capitalised when all the following criteria are met: \u2013  the production stripping activity improves access to a specific component of the ore body and it is probable that economic benefits arising from the improved access to future ore production will be realised \u2013  the component of the ore body for which access has been improved can be identified \u2013  costs associated with that component can be measured reliably Allocation of costs Production stripping costs are allocated between the inventory produced and the production stripping asset using a life-of- component waste-to-ore (or mineral contained) strip ratio. When the current strip ratio is greater than the estimated life-of- component ratio a portion of the stripping costs is capitalised to the production stripping asset. Asset recognised from stripping activity Inventory Other mineral assets within property, plant and equipment. Depreciation basis Not applicable  On a component-by-component basis using the units of production method based on proven and probable reserves. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForStrippingCostsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-761": {
   "value": "Depreciation Depreciation of assets, other than land, assets under construction and capitalised exploration and evaluation that are not depreciated, is calculated using either the straight-line (SL) method or units of production (UoP) method, net of residual values, over the estimated useful lives of specific assets. The depreciation method and rates applied to specific assets reflect the pattern in which the asset\u2019s benefits are expected to be used by the Group. The Group\u2019s proved and probable reserves for minerals assets are used to determine UoP depreciation unless doing so results in depreciation charges that do not reflect the asset\u2019s useful life. Where this occurs, alternative approaches to determining reserves are applied, to provide a phasing of periodic depreciation charges that better reflects the asset\u2019s expected useful life. Where assets are dedicated to a mine lease, the useful lives below are subject to the lesser of the asset category\u2019s useful life and the life of the mine lease, unless those assets are readily transferable to another productive mine. Assets classified as held for sale are measured at the lower of their carrying amount and fair value less cost to sell and therefore not depreciated. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDepreciationExpenseExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-664": {
   "value": "Commitments The Group\u2019s commitments for capital expenditure were US$3,975 million as at 30 June 2023 (2022: US$2,820 million). The Group\u2019s commitments related to leases are included in note 22 \u2018Leases\u2019. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCommitmentsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-712": {
   "value": "12  Intangible assets 2023 2022 Goodwill  US$M Other intangibles US$M Total  US$M Goodwill  US$M Other intangibles US$M Total  US$M Net book value At the beginning of the financial year 1,197 172 1,369 1,197 240 1,437 Additions \u2013 51 51  \u2212 36 36 Acquisition of subsidiaries and operations 1 192 \u2013 192  \u2212  \u2212  \u2212 Amortisation for the year \u2013 (94) (94)  \u2212 (60) (60) Impairments for the year2 \u2013 (2) (2)  \u2212  \u2212  \u2212 Disposals \u2013 (15) (15)  \u2212 (16) (16) Divestment and demerger of subsidiaries and operations3 \u2013  \u2212 \u2013  \u2212 (66) (66) Transfers and other movements \u2013 109 109  \u2212 38 38 At the end of the financial year 1,389 221 1,610 1,197 172 1,369 \u2013 Cost 1,389 1,529 2,918 1,197 1,363 2,560 \u2013 Accumulated amortisation and impairments \u2013 (1,308) (1,308)  \u2212 (1,191) (1,191) 1  Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019 for more information. 2  Refer to note 13 \u2018Impairment of non-current assets\u2019 for information on impairments. 3  Relates to the merger of Petroleum with Woodside in FY2022. Refer to note 28 \u2018Discontinued operations\u2019 for more information. Recognition and measurement Goodwill Where the fair value of the consideration paid for a business acquisition exceeds the fair value of the identifiable assets, liabilities and contingent liabilities acquired, the difference is treated as goodwill. Where consideration is less than the fair value of acquired net assets, the difference is recognised immediately in the income statement. Goodwill is not amortised and is measured at cost less any impairment losses. Other intangibles The Group capitalises amounts paid for the acquisition of identifiable intangible assets, such as software, licences and initial payments for the acquisition of mineral lease assets, where it is considered that they will contribute to future periods through revenue generation or reductions in cost. These assets, classified as finite life intangible assets, are carried in the balance sheet at the fair value of consideration paid (cost) less accumulated amortisation and impairment charges. Intangible assets with finite useful lives are amortised on a straight-line basis over their useful lives. The estimated useful lives are generally no greater than eight years. Initial payments for the acquisition of intangible mineral lease assets are capitalised and amortised over the term of the permit. A regular review is undertaken of each area of interest to determine the appropriateness of continuing to carry forward costs in relation to that area. Capitalised costs are only carried forward to the extent that they are expected to be recovered through the successful exploitation of the area of interest or alternatively by its sale. To the extent that capitalised expenditure is no longer expected to be recovered, it is charged to the income statement. Assets classified as held for sale are measured at the lower of their carrying amount and fair value less cost to sell and therefore not amortised. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfReconciliationOfChangesInIntangibleAssetsAndGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-700": {
   "value": "12  Intangible assets 2023 2022 Goodwill  US$M Other intangibles US$M Total  US$M Goodwill  US$M Other intangibles US$M Total  US$M Net book value At the beginning of the financial year 1,197 172 1,369 1,197 240 1,437 Additions \u2013 51 51  \u2212 36 36 Acquisition of subsidiaries and operations 1 192 \u2013 192  \u2212  \u2212  \u2212 Amortisation for the year \u2013 (94) (94)  \u2212 (60) (60) Impairments for the year2 \u2013 (2) (2)  \u2212  \u2212  \u2212 Disposals \u2013 (15) (15)  \u2212 (16) (16) Divestment and demerger of subsidiaries and operations3 \u2013  \u2212 \u2013  \u2212 (66) (66) Transfers and other movements \u2013 109 109  \u2212 38 38 At the end of the financial year 1,389 221 1,610 1,197 172 1,369 \u2013 Cost 1,389 1,529 2,918 1,197 1,363 2,560 \u2013 Accumulated amortisation and impairments \u2013 (1,308) (1,308)  \u2212 (1,191) (1,191) 1  Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019 for more information. 2  Refer to note 13 \u2018Impairment of non-current assets\u2019 for information on impairments. 3  Relates to the merger of Petroleum with Woodside in FY2022. Refer to note 28 \u2018Discontinued operations\u2019 for more information. Recognition and measurement Goodwill Where the fair value of the consideration paid for a business acquisition exceeds the fair value of the identifiable assets, liabilities and contingent liabilities acquired, the difference is treated as goodwill. Where consideration is less than the fair value of acquired net assets, the difference is recognised immediately in the income statement. Goodwill is not amortised and is measured at cost less any impairment losses. Other intangibles The Group capitalises amounts paid for the acquisition of identifiable intangible assets, such as software, licences and initial payments for the acquisition of mineral lease assets, where it is considered that they will contribute to future periods through revenue generation or reductions in cost. These assets, classified as finite life intangible assets, are carried in the balance sheet at the fair value of consideration paid (cost) less accumulated amortisation and impairment charges. Intangible assets with finite useful lives are amortised on a straight-line basis over their useful lives. The estimated useful lives are generally no greater than eight years. Initial payments for the acquisition of intangible mineral lease assets are capitalised and amortised over the term of the permit. A regular review is undertaken of each area of interest to determine the appropriateness of continuing to carry forward costs in relation to that area. Capitalised costs are only carried forward to the extent that they are expected to be recovered through the successful exploitation of the area of interest or alternatively by its sale. To the extent that capitalised expenditure is no longer expected to be recovered, it is charged to the income statement. Assets classified as held for sale are measured at the lower of their carrying amount and fair value less cost to sell and therefore not amortised. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-663": {
   "value": "12  Intangible assets 2023 2022 Goodwill  US$M Other intangibles US$M Total  US$M Goodwill  US$M Other intangibles US$M Total  US$M Net book value At the beginning of the financial year 1,197 172 1,369 1,197 240 1,437 Additions \u2013 51 51  \u2212 36 36 Acquisition of subsidiaries and operations 1 192 \u2013 192  \u2212  \u2212  \u2212 Amortisation for the year \u2013 (94) (94)  \u2212 (60) (60) Impairments for the year2 \u2013 (2) (2)  \u2212  \u2212  \u2212 Disposals \u2013 (15) (15)  \u2212 (16) (16) Divestment and demerger of subsidiaries and operations3 \u2013  \u2212 \u2013  \u2212 (66) (66) Transfers and other movements \u2013 109 109  \u2212 38 38 At the end of the financial year 1,389 221 1,610 1,197 172 1,369 \u2013 Cost 1,389 1,529 2,918 1,197 1,363 2,560 \u2013 Accumulated amortisation and impairments \u2013 (1,308) (1,308)  \u2212 (1,191) (1,191) 1  Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019 for more information. 2  Refer to note 13 \u2018Impairment of non-current assets\u2019 for information on impairments. 3  Relates to the merger of Petroleum with Woodside in FY2022. Refer to note 28 \u2018Discontinued operations\u2019 for more information. Recognition and measurement Goodwill Where the fair value of the consideration paid for a business acquisition exceeds the fair value of the identifiable assets, liabilities and contingent liabilities acquired, the difference is treated as goodwill. Where consideration is less than the fair value of acquired net assets, the difference is recognised immediately in the income statement. Goodwill is not amortised and is measured at cost less any impairment losses. Other intangibles The Group capitalises amounts paid for the acquisition of identifiable intangible assets, such as software, licences and initial payments for the acquisition of mineral lease assets, where it is considered that they will contribute to future periods through revenue generation or reductions in cost. These assets, classified as finite life intangible assets, are carried in the balance sheet at the fair value of consideration paid (cost) less accumulated amortisation and impairment charges. Intangible assets with finite useful lives are amortised on a straight-line basis over their useful lives. The estimated useful lives are generally no greater than eight years. Initial payments for the acquisition of intangible mineral lease assets are capitalised and amortised over the term of the permit. A regular review is undertaken of each area of interest to determine the appropriateness of continuing to carry forward costs in relation to that area. Capitalised costs are only carried forward to the extent that they are expected to be recovered through the successful exploitation of the area of interest or alternatively by its sale. To the extent that capitalised expenditure is no longer expected to be recovered, it is charged to the income statement. Assets classified as held for sale are measured at the lower of their carrying amount and fair value less cost to sell and therefore not amortised. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIntangibleAssetsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-628": {
   "value": "12  Intangible assets 2023 2022 Goodwill  US$M Other intangibles US$M Total  US$M Goodwill  US$M Other intangibles US$M Total  US$M Net book value At the beginning of the financial year 1,197 172 1,369 1,197 240 1,437 Additions \u2013 51 51  \u2212 36 36 Acquisition of subsidiaries and operations 1 192 \u2013 192  \u2212  \u2212  \u2212 Amortisation for the year \u2013 (94) (94)  \u2212 (60) (60) Impairments for the year2 \u2013 (2) (2)  \u2212  \u2212  \u2212 Disposals \u2013 (15) (15)  \u2212 (16) (16) Divestment and demerger of subsidiaries and operations3 \u2013  \u2212 \u2013  \u2212 (66) (66) Transfers and other movements \u2013 109 109  \u2212 38 38 At the end of the financial year 1,389 221 1,610 1,197 172 1,369 \u2013 Cost 1,389 1,529 2,918 1,197 1,363 2,560 \u2013 Accumulated amortisation and impairments \u2013 (1,308) (1,308)  \u2212 (1,191) (1,191) 1  Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019 for more information. 2  Refer to note 13 \u2018Impairment of non-current assets\u2019 for information on impairments. 3  Relates to the merger of Petroleum with Woodside in FY2022. Refer to note 28 \u2018Discontinued operations\u2019 for more information. Recognition and measurement Goodwill Where the fair value of the consideration paid for a business acquisition exceeds the fair value of the identifiable assets, liabilities and contingent liabilities acquired, the difference is treated as goodwill. Where consideration is less than the fair value of acquired net assets, the difference is recognised immediately in the income statement. Goodwill is not amortised and is measured at cost less any impairment losses. Other intangibles The Group capitalises amounts paid for the acquisition of identifiable intangible assets, such as software, licences and initial payments for the acquisition of mineral lease assets, where it is considered that they will contribute to future periods through revenue generation or reductions in cost. These assets, classified as finite life intangible assets, are carried in the balance sheet at the fair value of consideration paid (cost) less accumulated amortisation and impairment charges. Intangible assets with finite useful lives are amortised on a straight-line basis over their useful lives. The estimated useful lives are generally no greater than eight years. Initial payments for the acquisition of intangible mineral lease assets are capitalised and amortised over the term of the permit. A regular review is undertaken of each area of interest to determine the appropriateness of continuing to carry forward costs in relation to that area. Capitalised costs are only carried forward to the extent that they are expected to be recovered through the successful exploitation of the area of interest or alternatively by its sale. To the extent that capitalised expenditure is no longer expected to be recovered, it is charged to the income statement. Assets classified as held for sale are measured at the lower of their carrying amount and fair value less cost to sell and therefore not amortised. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIntangibleAssetsAndGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-762": {
   "value": "Goodwill Where the fair value of the consideration paid for a business acquisition exceeds the fair value of the identifiable assets, liabilities and contingent liabilities acquired, the difference is treated as goodwill. Where consideration is less than the fair value of acquired net assets, the difference is recognised immediately in the income statement. Goodwill is not amortised and is measured at cost less any impairment losses. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-740": {
   "value": "Goodwill Where the fair value of the consideration paid for a business acquisition exceeds the fair value of the identifiable assets, liabilities and contingent liabilities acquired, the difference is treated as goodwill. Where consideration is less than the fair value of acquired net assets, the difference is recognised immediately in the income statement. Goodwill is not amortised and is measured at cost less any impairment losses. Other intangibles The Group capitalises amounts paid for the acquisition of identifiable intangible assets, such as software, licences and initial payments for the acquisition of mineral lease assets, where it is considered that they will contribute to future periods through revenue generation or reductions in cost. These assets, classified as finite life intangible assets, are carried in the balance sheet at the fair value of consideration paid (cost) less accumulated amortisation and impairment charges. Intangible assets with finite useful lives are amortised on a straight-line basis over their useful lives. The estimated useful lives are generally no greater than eight years. Initial payments for the acquisition of intangible mineral lease assets are capitalised and amortised over the term of the permit. A regular review is undertaken of each area of interest to determine the appropriateness of continuing to carry forward costs in relation to that area. Capitalised costs are only carried forward to the extent that they are expected to be recovered through the successful exploitation of the area of interest or alternatively by its sale. To the extent that capitalised expenditure is no longer expected to be recovered, it is charged to the income statement. Assets classified as held for sale are measured at the lower of their carrying amount and fair value less cost to sell and therefore not amortised. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIntangibleAssetsAndGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-763": {
   "value": "Other intangibles The Group capitalises amounts paid for the acquisition of identifiable intangible assets, such as software, licences and initial payments for the acquisition of mineral lease assets, where it is considered that they will contribute to future periods through revenue generation or reductions in cost. These assets, classified as finite life intangible assets, are carried in the balance sheet at the fair value of consideration paid (cost) less accumulated amortisation and impairment charges. Intangible assets with finite useful lives are amortised on a straight-line basis over their useful lives. The estimated useful lives are generally no greater than eight years. Initial payments for the acquisition of intangible mineral lease assets are capitalised and amortised over the term of the permit. A regular review is undertaken of each area of interest to determine the appropriateness of continuing to carry forward costs in relation to that area. Capitalised costs are only carried forward to the extent that they are expected to be recovered through the successful exploitation of the area of interest or alternatively by its sale. To the extent that capitalised expenditure is no longer expected to be recovered, it is charged to the income statement. Assets classified as held for sale are measured at the lower of their carrying amount and fair value less cost to sell and therefore not amortised. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIntangibleAssetsOtherThanGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-629": {
   "value": "13  Impairment of non-current assets Cash generating unit Segment 2023 Property, plant and equipment US$M Goodwill and other intangibles US$M Equity- accounted investment US$M Total  US$M Other Various 73 2 \u2013 75 Total impairment of non-current assets 73 2 \u2013 75 Reversal of impairment \u2013 \u2013 \u2013 \u2013 Net impairment of non-current assets \u2013 Continuing operations 73 2 \u2013 75 Net impairment of non-current assets \u2013 Discontinued operations \u2013 \u2013 \u2013 \u2013 Net impairment of non-current assets 73 2 \u2013 75 Cash generating unit Segment 2022 Property, plant and equipment US$M Goodwill  and other intangibles US$M Equity- accounted investment US$M Total  US$M Cerro Colorado Copper 455  \u2212  \u2212 455 Other Various 60  \u2212  \u2212 60 Total impairment of non-current assets 515  \u2212  \u2212 515 Reversal of impairment  \u2212  \u2212  \u2212  \u2212 Net impairment of non-current assets \u2013 Continuing operations 515  \u2212  \u2212 515 Net impairment of non-current assets \u2013 Discontinued operations  \u2212  \u2212  \u2212  \u2212 Net impairment of non-current assets 515  \u2212  \u2212 515 Recognition and measurement Impairment tests for all non-financial assets (excluding goodwill) are performed when there is an indication of impairment. Goodwill is tested for impairment at least annually. Where the asset does not generate cash flows that are independent from other assets, the Group estimates the recoverable amount of the cash generating unit (CGU) to which the asset belongs, being the smallest identifiable group of assets that generates cash inflows that are largely independent of the cash inflows from other assets or groups of assets. If the carrying amount of the asset or CGU exceeds its recoverable amount, the asset or CGU is impaired and an impairment loss is charged to the income statement so as to reduce the carrying amount in the balance sheet to its recoverable amount. Previously impaired assets (excluding goodwill as impairment losses are not reversed in subsequent periods) are reviewed for possible reversal of previous impairment at each reporting date. Impairment reversal cannot exceed the carrying amount that would have been determined (net of depreciation) had no impairment loss been recognised for the asset or CGU. Such reversal is recognised in the income statement. There were no reversals of impairment in the current or prior year. How recoverable amount is calculated The recoverable amount is the higher of an asset\u2019s or CGU\u2019s fair value less cost of disposal (FVLCD) and its value in use (VIU). Fair value less cost of disposal FVLCD is an estimate of the amount that a market participant would pay for an asset or CGU, less the cost of disposal. FVLCD for mineral assets is generally determined using independent market assumptions to calculate the present value of the estimated future post-tax cash flows expected to arise from the continued use of the asset, including the anticipated cash flow effects of any capital expenditure to enhance production or reduce cost, and its eventual disposal where a market participant may take a consistent view. Cash flows are discounted using an appropriate post-tax market discount rate to arrive at a net present value of the asset, which is compared against the asset\u2019s carrying value. FVLCD may also take into consideration other market- based indicators of fair value. FVLCD are based primarily on Level 3 inputs as defined in note 24 \u2018Financial risk management\u2019 unless otherwise noted. Value in use VIU is determined as the present value of the estimated future cash flows expected to arise from the continued use of the asset in its present form and its eventual disposal or closure. VIU is determined by applying assumptions specific to the Group\u2019s continued use and cannot take into account future development. These assumptions are different to those used in calculating FVLCD and consequently the VIU calculation is likely to give a different result (usually lower) to a FVLCD calculation. Impairment of non-current assets (excluding goodwill) No material impairment of non-current assets for the year ended 30 June 2023. Impairment of non-current assets relating to the year ended 30 June 2022 are detailed below. Impairment of Cerro Colorado The Group recognised a pre-tax impairment charge of US$455 million. The impairment charge primarily related to an increase in closure and rehabilitation provision at Cerro Colorado due to additional work required to re-profile waste dumps for closure and an increase in scope for the closure activities. Impairment test for goodwill The carrying amount of goodwill has been allocated to the CGUs, or groups of CGUs, as follows: Cash generating unit 2023  US$M 2022  US$M Olympic Dam 1,010 1,010 OZ Minerals Limited provisional goodwill 192 \u2013 Other 187 187 Total goodwill 1,389 1,197 For the purpose of impairment testing, goodwill has been allocated to CGUs or groups of CGUs, that are expected to benefit from the synergies of previous business combinations, which represent the level at which management will monitor and manage goodwill. The Olympic Dam goodwill has been tested for impairment at 31 December 2022, as part of the Olympic Dam CGU. Details of the goodwill impairment test are provided below. On 2 May 2023, the Group acquired OZ Minerals Limited (OZL) (refer to note 29 \u2018Business combination\u2019 for details). The goodwill arising from the acquisition of US$192 million represents the provisional amount, which could not be reliably allocated to a CGU or group of CGUs at 30 June 2023. There were no indicators of impairment during the period from acquisition date to 30 June 2023 to suggest that the provisional goodwill had been impaired. Therefore, as at 30 June 2023, this goodwill has not yet been subject to any impairment testing. Goodwill held by other CGUs is US$187 million (2022: US$187 million). This represents less than one per cent of net assets at 30 June 2023 (2022: less than one per cent). There was no impairment of other goodwill in the year to 30 June 2023 (2022: US$ nil). Olympic Dam goodwill Impairment test conclusion  The Group performed an impairment test of the Olympic Dam CGU, including goodwill, as at 31 December 2022 and an impairment charge was not required. A goodwill impairment test was not required at 30 June 2023 as there were no indicators of impairment. How did the goodwill arise? Goodwill arose on the acquisition of WMC Resources Ltd in June 2005. Segment Olympic Dam is part of the Copper reportable segment. How were the valuations calculated? FVLCD methodology using DCF techniques has been applied in determining the recoverable amount of Olympic Dam. Significant assumptions and sensitivities The valuation of Olympic Dam exceeded its carrying amount by approximately US$4.2 billion (2022: US$2.4 billion) and is most sensitive to changes in copper and gold commodity prices, production volumes, operating costs and discount rates. The valuation applied a post-tax real discount rate of 6.5 per cent (2022: 6.5 per cent). Changes in copper and gold commodity price forecasts, estimated production volumes and operating costs and discount rates in the period between 31 December 2022 and 30 June 2023, including an increase to the discount rate applied to Olympic Dam to 7.0 per cent, did not result in an indicator of impairment. Further, it is considered that there are no reasonably possible changes in copper and gold price forecasts, operating cost estimates or the discount rate that would, in isolation, result in the estimated recoverable amount being equal to the carrying amount. A production volume decrease of 9.9 per cent (2022: 6 per cent) across all commodities (copper, gold, silver and uranium) would, in isolation, result in the estimated recoverable amount being equal to the carrying amount. Typically, changes in any one of the aforementioned assumptions (including operating performance) would be accompanied by a change in another assumption which may have an offsetting impact. Action is usually taken to respond to adverse changes in assumptions to mitigate the impact of any such change. Key judgements and estimates that have been applied in the FVLCD valuation are disclosed further below. Key judgements and estimates Judgements: Assessment of indicators of impairment or impairment reversal and the determination of CGUs for impairment purposes require significant management judgement. Indicators of impairment may include changes in the Group\u2019s operating and economic assumptions, including those arising from changes in reserves or mine planning, updates to the Group\u2019s commodity supply, demand and price forecasts, or the possible additional impacts from emerging risks including those related to climate change and the transition to a low-carbon economy. Climate change The Group\u2019s impairment assessments may be impacted by climate change and the transition to a low-carbon economy. Further detail is provided in note 16 \u2018Climate Change\u2019. Estimates: The Group performs a recoverable amount determination for an asset or CGU when there is an indication of impairment or impairment reversal. When the recoverable amount is measured by reference to FVLCD, in the absence of quoted market prices or binding sale agreement, estimates are made regarding the present value of future post-tax cash flows. These estimates are made from the perspective of a market participant and include prices, future production volumes, operating costs, capital expenditure, closure and rehabilitation costs, taxes, risking factors applied to cash flows and discount rates. The cash flow forecasts may include net cash flows expected from the extraction, processing and sale of material that does not currently qualify for inclusion in ore reserves. Reserves and resources are included in the assessment of FVLCD to the extent that it is considered probable that a market participant would attribute value to them. When recoverable amount is measured using VIU, estimates are made regarding the present value of future cash flows based on internal budgets and forecasts and life of asset plans. Key estimates are similar to those identified for FVLCD, although some assumptions and values may differ as they reflect the perspective of management rather than a market participant. All estimates require judgements and assumptions and are subject to risk and uncertainty that may be beyond the control of the Group; hence, there is a possibility that changes in circumstances will materially alter projections, which may impact the recoverable amount of an asset or CGU at each reporting date. While no indicators of impairment, or impairment reversal, were identified across the Group\u2019s CGUs at 30 June 2023, the carrying value of the Spence and Nickel West CGUs are the most susceptible to changes in the significant estimates outlined below in the next reporting period. The significant estimates impacting the Group\u2019s recoverable amount determinations are: Commodity prices Commodity prices were based on latest internal forecasts which assume short-term market prices will revert to the Group\u2019s assessment of long-term price. These price forecasts reflect management\u2019s long-term views of global supply and demand, built upon past experience of the commodity markets and are benchmarked with external sources of information such as analyst forecasts. Prices are adjusted based upon premiums or discounts applied to global price markers to reflect the location, nature and quality of the Group\u2019s production, or to take into account contracted prices. Future production volumes Estimated production volumes were based on detailed data and took into account development plans established by management as part of the Group\u2019s long-term planning process. When estimating FVLCD, assumptions reflect all reserves and resources that a market participant would consider when valuing the respective CGU, which in some cases are broader in scope than the reserves that would be used in a VIU test. In determining FVLCD, risk factors may be applied to reserves and resources which do not meet the criteria to be treated as proved. Cash outflows (including operating costs, capital expenditure, closure and rehabilitation costs and taxes) Cash outflows are based on internal budgets and forecasts and life of asset plans. Cost assumptions reflect management experience and expectations. Tax assumptions reflect existing and substantively enacted tax and royalty regimes and rates applicable in the jurisdiction of the CGU. In the case of FVLCD, cash flow projections include the anticipated cash flow effects of any capital expenditure to enhance production or reduce cost where a market participant may take a consistent view. VIU does not take into account future development. Discount rates The Group uses real post-tax discount rates applied to real post-tax cash flows. The discount rates are derived using the weighted average cost of capital methodology. Adjustments to the rates are made for any risks that are not reflected in the underlying cash flows, including country risk. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfImpairmentOfAssetsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-741": {
   "value": "Recognition and measurement Impairment tests for all non-financial assets (excluding goodwill) are performed when there is an indication of impairment. Goodwill is tested for impairment at least annually. Where the asset does not generate cash flows that are independent from other assets, the Group estimates the recoverable amount of the cash generating unit (CGU) to which the asset belongs, being the smallest identifiable group of assets that generates cash inflows that are largely independent of the cash inflows from other assets or groups of assets. If the carrying amount of the asset or CGU exceeds its recoverable amount, the asset or CGU is impaired and an impairment loss is charged to the income statement so as to reduce the carrying amount in the balance sheet to its recoverable amount. Previously impaired assets (excluding goodwill as impairment losses are not reversed in subsequent periods) are reviewed for possible reversal of previous impairment at each reporting date. Impairment reversal cannot exceed the carrying amount that would have been determined (net of depreciation) had no impairment loss been recognised for the asset or CGU. Such reversal is recognised in the income statement. There were no reversals of impairment in the current or prior year. How recoverable amount is calculated The recoverable amount is the higher of an asset\u2019s or CGU\u2019s fair value less cost of disposal (FVLCD) and its value in use (VIU). Fair value less cost of disposal FVLCD is an estimate of the amount that a market participant would pay for an asset or CGU, less the cost of disposal. FVLCD for mineral assets is generally determined using independent market assumptions to calculate the present value of the estimated future post-tax cash flows expected to arise from the continued use of the asset, including the anticipated cash flow effects of any capital expenditure to enhance production or reduce cost, and its eventual disposal where a market participant may take a consistent view. Cash flows are discounted using an appropriate post-tax market discount rate to arrive at a net present value of the asset, which is compared against the asset\u2019s carrying value. FVLCD may also take into consideration other market- based indicators of fair value. FVLCD are based primarily on Level 3 inputs as defined in note 24 \u2018Financial risk management\u2019 unless otherwise noted. Value in use VIU is determined as the present value of the estimated future cash flows expected to arise from the continued use of the asset in its present form and its eventual disposal or closure. VIU is determined by applying assumptions specific to the Group\u2019s continued use and cannot take into account future development. These assumptions are different to those used in calculating FVLCD and consequently the VIU calculation is likely to give a different result (usually lower) to a FVLCD calculation. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForImpairmentOfAssetsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-665": {
   "value": "Impairment of non-current assets (excluding goodwill) No material impairment of non-current assets for the year ended 30 June 2023. Impairment of non-current assets relating to the year ended 30 June 2022 are detailed below. Impairment of Cerro Colorado The Group recognised a pre-tax impairment charge of US$455 million. The impairment charge primarily related to an increase in closure and rehabilitation provision at Cerro Colorado due to additional work required to re-profile waste dumps for closure and an increase in scope for the closure activities. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInformationForEachMaterialImpairmentLossRecognisedOrReversedForIndividualAssetOrCashgeneratingUnitExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-630": {
   "value": "14  Deferred tax balances The movement for the year in the Group\u2019s net deferred tax position is as follows: 2023  US$M 2022  US$M 2021  US$M Net deferred tax (liability)/asset At the beginning of the financial year (3,007) (1,402) (91) Acquisition of subsidiaries and operations 1 (867)  \u2212  \u2212 Income tax charge recorded in the income statement 2,3 (387) (125) (1,325) Income tax credit/(charge) recorded directly in equity 6 (42) 42 Divestment and demerger of subsidiaries and operations 4 \u2013 (1,439)  \u2212 Other movements 12 1 (28) At the end of the financial year (4,243) (3,007) (1,402) 1  Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019 for more information. 2  Includes Discontinued operations income tax (charge)/credit to the income statement in 2022 of US$(61) million (2021: US$273 million). 3  Includes US$(283) million revaluation of deferred tax balances in the year ended 30 June 2023, following the substantive enactment of the Chilean Royalty Bill. Refer to note 3 \u2018Exceptional items\u2019 for more information. 4  Relates to the divestment of BMC and merger of Petroleum with Woodside. Refer to notes 3 \u2018Exceptional items\u2019 and 28 \u2018Discontinued operations\u2019 for more information. For recognition and measurement refer to note 6 \u2018Income tax expense\u2019 . The composition of the Group\u2019s net deferred tax assets and liabilities recognised in the balance sheet and the deferred tax expense charged/(credited) to the income statement is as follows: Deferred tax assets Deferred tax liabilities Charged/(credited) to the income statement 2023  US$M 2022  US$M 2023  US$M 2022  US$M 2023  US$M 2022  US$M 2021  US$M Type of temporary difference Depreciation 1 (629) (526) 6,259 4,844 452 554 488 Exploration expenditure 11 9 (1)  \u2212 (2) 13 347 Employee benefits 27 21 (425) (322) (94) 20 (68) Closure and rehabilitation 143 104 (1,753) (1,448) (296) 24 (515) Resource rent tax  \u2013  \u2212 \u2013  \u2212 \u2013 (129) (309) Other provisions 64 70 (210) (192) 4 49 77 Deferred income 14 51 \u2013 (1) 37 (31) (31) Deferred charges (82) (57) 644 584 85 7 68 Investments, including foreign tax credits 225 139 370 365 (54) (298) 414 Foreign exchange gains and losses (14) (13) 190 154 42 33 63 Tax losses 276 225 (214) (307) 37 28 678 Lease liability1 18 17 (767) (594) (83) (10) 67 Other 3 16 206 (20) 259 (135) 46 Total  56 56 4,299 3,063 387 125 1,325 1  Includes deferred tax associated with the recognition of right-of-use assets and lease liabilities on adoption of IFRS 16. Refer to note 22 \u2018Leases\u2019. The composition of the Group\u2019s unrecognised deferred tax assets and liabilities is as follows: 2023  US$M 2022  US$M Unrecognised deferred tax assets Tax losses and tax credits 1 8,572 8,462 Investments in subsidiaries2 1,661 1,597 Mineral rights3 3,287 2,781 Other deductible temporary differences4 1,912 1,777 Total unrecognised deferred tax assets 15,432 14,617 Unrecognised deferred tax liabilities Investments in subsidiaries2 2,179 2,099 Total unrecognised deferred tax liabilities 2,179 2,099 1  At 30 June 2023, the Group had income and capital tax losses with a tax benefit of US$5,709 million (2022: US$5,777 million) and tax credits of US$2,863 million (2022: US$2,685 million), which are not recognised as deferred tax assets, because it is not probable that future taxable profits or capital gains will be available against which the Group can utilise the benefits.   The gross amount of tax losses carried forward that have not been recognised is as follows: Year of expiry 2023  US$M 2022 US$M Income tax losses Not later than one year 22  \u2212 Later than one year and not later than two years 5  \u2212 Later than two years and not later than five years 47 43 Later than five years and not later than 10 years 549 248 Later than 10 years and not later than 20 years 1,317 1,290 Unlimited 4,889 4,157 6,829 5,738 Capital tax losses Not later than one year \u2013  \u2212 Later than two years and not later than five years \u2013  \u2212 Unlimited 13,870 14,173 Gross amount of tax losses not recognised 20,699 19,911 Tax effect of total losses not recognised 5,709 5,777  Of the US$2,863 million of tax credits, US$2,405 million expires not later than 10 years (2022: US$2,129 million) and US$458 million expires later than 10 years and not later than 20 years (2022: US$556 million). 2  The Group has deferred tax assets and deferred tax liabilities associated with undistributed earnings of subsidiaries that have not been recognised because the Group is able to control the timing of the reversal of the temporary differences and it is not probable that these differences will reverse in the foreseeable future. Where the Group has undistributed earnings held by associates and joint interests, the deferred tax liability will be recognised as there is no ability to control the timing of the potential distributions. 3  The Group has deductible temporary differences relating to mineral rights for which deferred tax assets have not been recognised because it is not probable that future capital gains will be available against which the Group can utilise the benefits. The deductible temporary differences do not expire under current tax legislation. 4  The Group has other deductible temporary differences for which deferred tax assets have not been recognised because it is not probable that future taxable profits will be available against which the Group can utilise the benefits. The deductible temporary differences do not expire under current tax legislation. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDeferredTaxesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-666": {
   "value": "The composition of the Group\u2019s unrecognised deferred tax assets and liabilities is as follows: 2023  US$M 2022  US$M Unrecognised deferred tax assets Tax losses and tax credits 1 8,572 8,462 Investments in subsidiaries2 1,661 1,597 Mineral rights3 3,287 2,781 Other deductible temporary differences4 1,912 1,777 Total unrecognised deferred tax assets 15,432 14,617 Unrecognised deferred tax liabilities Investments in subsidiaries2 2,179 2,099 Total unrecognised deferred tax liabilities 2,179 2,099 1  At 30 June 2023, the Group had income and capital tax losses with a tax benefit of US$5,709 million (2022: US$5,777 million) and tax credits of US$2,863 million (2022: US$2,685 million), which are not recognised as deferred tax assets, because it is not probable that future taxable profits or capital gains will be available against which the Group can utilise the benefits.   The gross amount of tax losses carried forward that have not been recognised is as follows: Year of expiry 2023  US$M 2022 US$M Income tax losses Not later than one year 22  \u2212 Later than one year and not later than two years 5  \u2212 Later than two years and not later than five years 47 43 Later than five years and not later than 10 years 549 248 Later than 10 years and not later than 20 years 1,317 1,290 Unlimited 4,889 4,157 6,829 5,738 Capital tax losses Not later than one year \u2013  \u2212 Later than two years and not later than five years \u2013  \u2212 Unlimited 13,870 14,173 Gross amount of tax losses not recognised 20,699 19,911 Tax effect of total losses not recognised 5,709 5,777  Of the US$2,863 million of tax credits, US$2,405 million expires not later than 10 years (2022: US$2,129 million) and US$458 million expires later than 10 years and not later than 20 years (2022: US$556 million). 2  The Group has deferred tax assets and deferred tax liabilities associated with undistributed earnings of subsidiaries that have not been recognised because the Group is able to control the timing of the reversal of the temporary differences and it is not probable that these differences will reverse in the foreseeable future. Where the Group has undistributed earnings held by associates and joint interests, the deferred tax liability will be recognised as there is no ability to control the timing of the potential distributions. 3  The Group has deductible temporary differences relating to mineral rights for which deferred tax assets have not been recognised because it is not probable that future capital gains will be available against which the Group can utilise the benefits. The deductible temporary differences do not expire under current tax legislation. 4  The Group has other deductible temporary differences for which deferred tax assets have not been recognised because it is not probable that future taxable profits will be available against which the Group can utilise the benefits. The deductible temporary differences do not expire under current tax legislation. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTemporaryDifferenceUnusedTaxLossesAndUnusedTaxCreditsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-631": {
   "value": "15  Closure and rehabilitation provisions 2023  US$M 2022  US$M At the beginning of the financial year 8,689 11,910 Capitalised amounts for operating sites: Change in estimate 510 1,579 Exchange translation  (50) (694) Adjustments charged/(credited) to the income statement: Increases to existing and new provisions 47 174 Exchange translation  (8) (58) Released during the year (35) (42) Other adjustments to the provision: Amortisation of discounting impacting net finance costs  839 554 Acquisition of subsidiaries and operations1 168  \u2212 Divestment and demerger of subsidiaries and operations  \u2013 (4,477) Expenditure on closure and rehabilitation activities (273) (316) Exchange variations impacting foreign currency translation reserve \u2013 (3) Other movements \u2013 62 At the end of the financial year 9,887 8,689 Comprising: Current 520 475 Non-current 9,367 8,214 Operating sites 7,366 6,198 Closed sites 2,521 2,491 1  Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019 for more information. Profile of closure and rehabilitation cash flows The table below indicates the estimated profile of the Group\u2019s closure and rehabilitation provisions. The profile reflects the undiscounted forecast cash flows that underpin the provisions. In some instances, the Group has an obligation to rehabilitate and maintain a closed site for an indefinite period. For the purpose of this analysis, the cashflow period has been restricted to 100 years. Proportion of the Group\u2019s undiscounted forecast cashflows 2023 % 2022 % In one year or less   3  3 In more than one year but not more than two years  4  3 In more than two years but not more than five years  8  9 In more than five years but not more than ten years 14 15 In more than ten years 71 70 Total 100 100 The Group is required to close and rehabilitate sites and associated facilities at the end of or, in some cases, during the course of production to a condition acceptable to the relevant authorities, as specified in licence requirements and the Group\u2019s closure performance requirements. The key components of closure and rehabilitation activities are: \u2013  the removal of all unwanted infrastructure associated with an operation \u2013  the return of disturbed areas to a safe, stable and self-sustaining condition, consistent with the agreed post-closure land use Recognition and measurement Provisions for closure and rehabilitation are recognised by the Group when: \u2013  it has a present legal or constructive obligation as a result of past events \u2013  it is more likely than not that an outflow of resources will be required to settle the obligation \u2013  the amount can be reliably estimated Initial recognition and measurement Subsequent measurement Closure and rehabilitation provisions are initially recognised when an environmental disturbance first occurs. The individual site provisions are an estimate of the expected value of future cash flows required to close the relevant site using current standards and techniques and taking into account risks and uncertainties. Individual site provisions are discounted to their present value using currency specific discount rates aligned to the estimated timing of cash outflows. When provisions for closure and rehabilitation are initially recognised, the corresponding cost is capitalised as an asset, representing part of the cost of acquiring the future economic benefits of the operation. The closure and rehabilitation asset, recognised within property, plant and equipment, is depreciated over the life of the operations. The value of the provision is progressively increased over time as the effect of discounting unwinds, resulting in an expense recognised in net finance costs. The closure and rehabilitation provision is reviewed at each reporting date to assess if the estimate continues to reflect the best estimate of the obligation. If necessary, the provision is remeasured to account for factors such as: \u2013  additional disturbance during the period \u2013  revisions to estimated reserves, resources and lives of operations including any changes to expected operating lives arising from the Group\u2019s latest assessment of the potential impacts of climate change and the transition to a low-carbon economy \u2013  developments in technology \u2013  changes to regulatory requirements and environmental management strategies \u2013  changes in the estimated extent and costs of anticipated activities, including the effects of inflation and movements in foreign exchange rates \u2013  movements in interest rates affecting the discount rate applied Changes to the closure and rehabilitation estimate for operating sites are added to, or deducted from, the related asset and amortised on a prospective basis over the remaining life of the operation, generally applying the units of production method. Costs arising from unforeseen circumstances, such as the contamination caused by unplanned discharges, are recognised as an expense and liability when the event gives rise to an obligation that is probable and capable of reliable estimation. Closed sites Where future economic benefits are no longer expected to be derived through operation, changes to the associated closure and remediation costs are charged to the income statement in the period identified. This amounted to US$4 million in the year ended 30 June 2023 (2022: US$74 million; 2021: US$483 million). Key estimates Closure cost estimates are generally based on conceptual level studies early in the operating life of an asset with more detailed studies and planning performed as closure risks (including those related to climate change) are identified and/or as an asset, or parts thereof, near closure. As such, the recognition and measurement of closure and rehabilitation provisions requires the use of significant estimates and assumptions, including, but not limited to: \u2013  the extent (due to legal or constructive obligations) of potential activities required for the removal of infrastructure, decharacterisation of tailings storage facilities and rehabilitation activities \u2013  costs associated with future closure activities \u2013  the extent and period of post-closure monitoring and maintenance, including water management \u2013  applicable discount rates \u2013  the timing of cash flows and ultimate closure of operations The extent, cost and timing of future closure activities may also be impacted by the potential physical impacts of climate change and the transition to a low-carbon economy. Further detail is provided in note 16 \u2018Climate Change\u2019. Estimates for post-closure monitoring and maintenance reflect the Group\u2019s strategies for individual sites, which may include possible relinquishment. The period of monitoring and maintenance included in the provision requires judgement and considers regulatory and licencing requirements, the outcomes of studies and management\u2019s current assessment of stakeholder expectations. While progressive closure is performed across a number of operations, significant activities are generally undertaken at the end of the production life at the individual sites, the estimated timing of which is informed by the Group\u2019s current assumptions relating to demand for commodities and carbon pricing, and their impact on the Group\u2019s long-term price forecasts. Approximately 51 per cent (2022: 48 per cent) of the Group\u2019s total undiscounted forecast cashflows are expected to be incurred after more than 30 years, reflecting the long-lived nature of many of the Group\u2019s operations which have remaining production lives ranging from 1-103 years (2022: 2-104 years). The discount rates applied to the Group\u2019s closure and rehabilitation provisions are determined by reference to the currency of the closure cash flows, the period over which the cash flows will be incurred and prevailing market interest rates (where available). The Group continues to monitor current market conditions with no change made to the Group\u2019s discount rates in the current year. While the closure and rehabilitation provisions reflect management\u2019s best estimates based on current knowledge and information, further studies, trials and detailed analysis of relevant knowledge and resultant closure activities for individual assets continue to be performed throughout the life of asset. Such studies and analysis can impact the estimated costs of closure activities. Estimates can also be impacted by the emergence of new closure and rehabilitation techniques, changes in regulatory requirements and stakeholder expectations for closure (including costs associated with equitable transition), development of new technologies, risks relating to climate change and the transition to a low-carbon economy, and experience at other operations. These uncertainties may result in future actual expenditure differing from the amounts currently provided for in the balance sheet. Sensitivity A 0.5 per cent increase in the discount rates applied at 30 June 2023 would result in a decrease to the closure and rehabilitation provision of approximately US$758 million, a decrease in property, plant and equipment of approximately US$568 million in relation to operating sites and an income statement credit of approximately US$190 million in respect of closed sites. In addition, the change would result in a decrease of approximately US$44 million to depreciation expense and a US$26 million increment in net finance costs for the year ending 30 June 2024. Given the long-lived nature of the majority of the Group\u2019s assets, the majority of final closure activities are generally not expected to occur for a significant period of time. However, a one-year acceleration in forecast cash flows of the Group\u2019s closure and rehabilitation provisions, in isolation, would result in an increase to the provision of approximately US$209 million, an increase in property, plant and equipment of US$148 million in relation to operating sites and an income statement charge of US$61 million in respect of closed sites. 20  Provisions for dividends and other liabilities The disclosure below excludes closure and rehabilitation provisions (refer to note 15 \u2018Closure and rehabilitation provisions\u2019), employee benefits, restructuring and post-retirement employee benefits provisions (refer to note 27 \u2018Employee benefits, restructuring and post-retirement employee benefits provisions\u2019) and provisions related to the Samarco dam failure (refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019). 2023  US$M 2022  US$M At the beginning of the financial year 674 581 Acquisition of subsidiaries and operations 1 61 \u2013 Dividends determined 13,420 17,720 Charge/(credit) for the year: Underlying 156 493 Discounting 2 1 Exchange variations (161) 122 Released during the year (62) (48) Utilisation (35) (96) Dividends paid (13,268) (17,851) Divestment and demerger of subsidiaries and operations   \u2212 (146) Transfers and other movements (18) (102) At the end of the financial year 769 674 Comprising: Current 384 356 Non-current 385 318 1  Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019 for more information. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfProvisionsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-667": {
   "value": "15  Closure and rehabilitation provisions 2023  US$M 2022  US$M At the beginning of the financial year 8,689 11,910 Capitalised amounts for operating sites: Change in estimate 510 1,579 Exchange translation  (50) (694) Adjustments charged/(credited) to the income statement: Increases to existing and new provisions 47 174 Exchange translation  (8) (58) Released during the year (35) (42) Other adjustments to the provision: Amortisation of discounting impacting net finance costs  839 554 Acquisition of subsidiaries and operations1 168  \u2212 Divestment and demerger of subsidiaries and operations  \u2013 (4,477) Expenditure on closure and rehabilitation activities (273) (316) Exchange variations impacting foreign currency translation reserve \u2013 (3) Other movements \u2013 62 At the end of the financial year 9,887 8,689 Comprising: Current 520 475 Non-current 9,367 8,214 Operating sites 7,366 6,198 Closed sites 2,521 2,491 1  Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019 for more information. Profile of closure and rehabilitation cash flows The table below indicates the estimated profile of the Group\u2019s closure and rehabilitation provisions. The profile reflects the undiscounted forecast cash flows that underpin the provisions. In some instances, the Group has an obligation to rehabilitate and maintain a closed site for an indefinite period. For the purpose of this analysis, the cashflow period has been restricted to 100 years. Proportion of the Group\u2019s undiscounted forecast cashflows 2023 % 2022 % In one year or less   3  3 In more than one year but not more than two years  4  3 In more than two years but not more than five years  8  9 In more than five years but not more than ten years 14 15 In more than ten years 71 70 Total 100 100 The Group is required to close and rehabilitate sites and associated facilities at the end of or, in some cases, during the course of production to a condition acceptable to the relevant authorities, as specified in licence requirements and the Group\u2019s closure performance requirements. The key components of closure and rehabilitation activities are: \u2013  the removal of all unwanted infrastructure associated with an operation \u2013  the return of disturbed areas to a safe, stable and self-sustaining condition, consistent with the agreed post-closure land use Recognition and measurement Provisions for closure and rehabilitation are recognised by the Group when: \u2013  it has a present legal or constructive obligation as a result of past events \u2013  it is more likely than not that an outflow of resources will be required to settle the obligation \u2013  the amount can be reliably estimated Initial recognition and measurement Subsequent measurement Closure and rehabilitation provisions are initially recognised when an environmental disturbance first occurs. The individual site provisions are an estimate of the expected value of future cash flows required to close the relevant site using current standards and techniques and taking into account risks and uncertainties. Individual site provisions are discounted to their present value using currency specific discount rates aligned to the estimated timing of cash outflows. When provisions for closure and rehabilitation are initially recognised, the corresponding cost is capitalised as an asset, representing part of the cost of acquiring the future economic benefits of the operation. The closure and rehabilitation asset, recognised within property, plant and equipment, is depreciated over the life of the operations. The value of the provision is progressively increased over time as the effect of discounting unwinds, resulting in an expense recognised in net finance costs. The closure and rehabilitation provision is reviewed at each reporting date to assess if the estimate continues to reflect the best estimate of the obligation. If necessary, the provision is remeasured to account for factors such as: \u2013  additional disturbance during the period \u2013  revisions to estimated reserves, resources and lives of operations including any changes to expected operating lives arising from the Group\u2019s latest assessment of the potential impacts of climate change and the transition to a low-carbon economy \u2013  developments in technology \u2013  changes to regulatory requirements and environmental management strategies \u2013  changes in the estimated extent and costs of anticipated activities, including the effects of inflation and movements in foreign exchange rates \u2013  movements in interest rates affecting the discount rate applied Changes to the closure and rehabilitation estimate for operating sites are added to, or deducted from, the related asset and amortised on a prospective basis over the remaining life of the operation, generally applying the units of production method. Costs arising from unforeseen circumstances, such as the contamination caused by unplanned discharges, are recognised as an expense and liability when the event gives rise to an obligation that is probable and capable of reliable estimation. Closed sites Where future economic benefits are no longer expected to be derived through operation, changes to the associated closure and remediation costs are charged to the income statement in the period identified. This amounted to US$4 million in the year ended 30 June 2023 (2022: US$74 million; 2021: US$483 million). Key estimates Closure cost estimates are generally based on conceptual level studies early in the operating life of an asset with more detailed studies and planning performed as closure risks (including those related to climate change) are identified and/or as an asset, or parts thereof, near closure. As such, the recognition and measurement of closure and rehabilitation provisions requires the use of significant estimates and assumptions, including, but not limited to: \u2013  the extent (due to legal or constructive obligations) of potential activities required for the removal of infrastructure, decharacterisation of tailings storage facilities and rehabilitation activities \u2013  costs associated with future closure activities \u2013  the extent and period of post-closure monitoring and maintenance, including water management \u2013  applicable discount rates \u2013  the timing of cash flows and ultimate closure of operations The extent, cost and timing of future closure activities may also be impacted by the potential physical impacts of climate change and the transition to a low-carbon economy. Further detail is provided in note 16 \u2018Climate Change\u2019. Estimates for post-closure monitoring and maintenance reflect the Group\u2019s strategies for individual sites, which may include possible relinquishment. The period of monitoring and maintenance included in the provision requires judgement and considers regulatory and licencing requirements, the outcomes of studies and management\u2019s current assessment of stakeholder expectations. While progressive closure is performed across a number of operations, significant activities are generally undertaken at the end of the production life at the individual sites, the estimated timing of which is informed by the Group\u2019s current assumptions relating to demand for commodities and carbon pricing, and their impact on the Group\u2019s long-term price forecasts. Approximately 51 per cent (2022: 48 per cent) of the Group\u2019s total undiscounted forecast cashflows are expected to be incurred after more than 30 years, reflecting the long-lived nature of many of the Group\u2019s operations which have remaining production lives ranging from 1-103 years (2022: 2-104 years). The discount rates applied to the Group\u2019s closure and rehabilitation provisions are determined by reference to the currency of the closure cash flows, the period over which the cash flows will be incurred and prevailing market interest rates (where available). The Group continues to monitor current market conditions with no change made to the Group\u2019s discount rates in the current year. While the closure and rehabilitation provisions reflect management\u2019s best estimates based on current knowledge and information, further studies, trials and detailed analysis of relevant knowledge and resultant closure activities for individual assets continue to be performed throughout the life of asset. Such studies and analysis can impact the estimated costs of closure activities. Estimates can also be impacted by the emergence of new closure and rehabilitation techniques, changes in regulatory requirements and stakeholder expectations for closure (including costs associated with equitable transition), development of new technologies, risks relating to climate change and the transition to a low-carbon economy, and experience at other operations. These uncertainties may result in future actual expenditure differing from the amounts currently provided for in the balance sheet. Sensitivity A 0.5 per cent increase in the discount rates applied at 30 June 2023 would result in a decrease to the closure and rehabilitation provision of approximately US$758 million, a decrease in property, plant and equipment of approximately US$568 million in relation to operating sites and an income statement credit of approximately US$190 million in respect of closed sites. In addition, the change would result in a decrease of approximately US$44 million to depreciation expense and a US$26 million increment in net finance costs for the year ending 30 June 2024. Given the long-lived nature of the majority of the Group\u2019s assets, the majority of final closure activities are generally not expected to occur for a significant period of time. However, a one-year acceleration in forecast cash flows of the Group\u2019s closure and rehabilitation provisions, in isolation, would result in an increase to the provision of approximately US$209 million, an increase in property, plant and equipment of US$148 million in relation to operating sites and an income statement charge of US$61 million in respect of closed sites.  ",
   "dimensions": {
    "concept": "bhp:DisclosureOfDecommissioningRestorationAndRehabilitationProvision",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-764": {
   "value": "Recognition and measurement Provisions for closure and rehabilitation are recognised by the Group when: \u2013  it has a present legal or constructive obligation as a result of past events \u2013  it is more likely than not that an outflow of resources will be required to settle the obligation \u2013  the amount can be reliably estimated Initial recognition and measurement Subsequent measurement Closure and rehabilitation provisions are initially recognised when an environmental disturbance first occurs. The individual site provisions are an estimate of the expected value of future cash flows required to close the relevant site using current standards and techniques and taking into account risks and uncertainties. Individual site provisions are discounted to their present value using currency specific discount rates aligned to the estimated timing of cash outflows. When provisions for closure and rehabilitation are initially recognised, the corresponding cost is capitalised as an asset, representing part of the cost of acquiring the future economic benefits of the operation. The closure and rehabilitation asset, recognised within property, plant and equipment, is depreciated over the life of the operations. The value of the provision is progressively increased over time as the effect of discounting unwinds, resulting in an expense recognised in net finance costs. The closure and rehabilitation provision is reviewed at each reporting date to assess if the estimate continues to reflect the best estimate of the obligation. If necessary, the provision is remeasured to account for factors such as: \u2013  additional disturbance during the period \u2013  revisions to estimated reserves, resources and lives of operations including any changes to expected operating lives arising from the Group\u2019s latest assessment of the potential impacts of climate change and the transition to a low-carbon economy \u2013  developments in technology \u2013  changes to regulatory requirements and environmental management strategies \u2013  changes in the estimated extent and costs of anticipated activities, including the effects of inflation and movements in foreign exchange rates \u2013  movements in interest rates affecting the discount rate applied Changes to the closure and rehabilitation estimate for operating sites are added to, or deducted from, the related asset and amortised on a prospective basis over the remaining life of the operation, generally applying the units of production method. Costs arising from unforeseen circumstances, such as the contamination caused by unplanned discharges, are recognised as an expense and liability when the event gives rise to an obligation that is probable and capable of reliable estimation. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDecommissioningRestorationAndRehabilitationProvisionsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-742": {
   "value": "Recognition and measurement Provisions for closure and rehabilitation are recognised by the Group when: \u2013  it has a present legal or constructive obligation as a result of past events \u2013  it is more likely than not that an outflow of resources will be required to settle the obligation \u2013  the amount can be reliably estimated Initial recognition and measurement Subsequent measurement Closure and rehabilitation provisions are initially recognised when an environmental disturbance first occurs. The individual site provisions are an estimate of the expected value of future cash flows required to close the relevant site using current standards and techniques and taking into account risks and uncertainties. Individual site provisions are discounted to their present value using currency specific discount rates aligned to the estimated timing of cash outflows. When provisions for closure and rehabilitation are initially recognised, the corresponding cost is capitalised as an asset, representing part of the cost of acquiring the future economic benefits of the operation. The closure and rehabilitation asset, recognised within property, plant and equipment, is depreciated over the life of the operations. The value of the provision is progressively increased over time as the effect of discounting unwinds, resulting in an expense recognised in net finance costs. The closure and rehabilitation provision is reviewed at each reporting date to assess if the estimate continues to reflect the best estimate of the obligation. If necessary, the provision is remeasured to account for factors such as: \u2013  additional disturbance during the period \u2013  revisions to estimated reserves, resources and lives of operations including any changes to expected operating lives arising from the Group\u2019s latest assessment of the potential impacts of climate change and the transition to a low-carbon economy \u2013  developments in technology \u2013  changes to regulatory requirements and environmental management strategies \u2013  changes in the estimated extent and costs of anticipated activities, including the effects of inflation and movements in foreign exchange rates \u2013  movements in interest rates affecting the discount rate applied Changes to the closure and rehabilitation estimate for operating sites are added to, or deducted from, the related asset and amortised on a prospective basis over the remaining life of the operation, generally applying the units of production method. Costs arising from unforeseen circumstances, such as the contamination caused by unplanned discharges, are recognised as an expense and liability when the event gives rise to an obligation that is probable and capable of reliable estimation. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForProvisionsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-632": {
   "value": "16 <span class=\"_ _47\"> </span>Climate change<span class=\"_ _39c\"> </span>The Group recognises that warming of the climate is unequivocal, the human influence is clear and physical impacts are unavoidable. Identifying, monitoring and assessing the actual and potential impacts of climate change is complex and the Group continues to develop its assessment of the actual and potential financial impacts of climate-related risks and opportunities, including the transition to a low-carbon economy and physical risk impacts. The Group\u2019s current climate change strategy focuses on:<span class=\"_ _39c\"> </span>\u2013  <span class=\"ff70\">building a portfolio to support the megatrends shaping our world, including future-facing commodities (copper, nickel and potash) and steelmaking </span>materials (iron ore and metallurgical coal)<span class=\"_ _39c\"> </span>\u2013  <span class=\"ff70\">reducing operational greenhouse gas (GHG) emissions<span class=\"_ _39c\"> </span></span>\u2013  <span class=\"ff70\">investing in low GHG emissions technologies<span class=\"_ _39c\"> </span></span>\u2013  <span class=\"ff70\">supporting GHG emissions reductions in our value chain and promoting product stewardship<span class=\"_ _39c\"> </span></span>\u2013  <span class=\"ff70\">managing climate-related risks (threats and opportunities)<span class=\"_ _39c\"> </span></span>\u2013  <span class=\"ff70\">working with others to enhance the global policy and market response </span>Areas of the financial statements that may potentially be impacted in connection with this strategy throughout the value creation and delivery cycle of the Group\u2019s operations, include:<span class=\"_ _39c\"> </span>Phase<span class=\"_ _2de\"> </span><span class=\"ff72\">Areas of potential financial statement impact<span class=\"_ _39c\"> </span></span>Exploration and acquisition<span class=\"_ _58\"> </span><span class=\"ff71\">\u2013 <span class=\"_ _53\"> </span></span>Financial impact of portfolio decisions<span class=\"_ _39c\"> </span>Development and mining / <span class=\"ff70\"> </span>Process and logistics<span class=\"_ _39c\"> </span>\u2013  <span class=\"ff70\">Impact of transition risks (threats and opportunities) on asset carrying values<span class=\"_ _39c\"> </span></span>\u2013  <span class=\"ff70\">Physical risk impacts on asset carrying values<span class=\"_ _39c\"> </span></span>\u2013  <span class=\"ff70\">Acquisition of carbon credits, and application of carbon pricing assumptions<span class=\"_ _39c\"> </span></span>\u2013  <span class=\"ff70\">Useful economic lives of property<span class=\"_ _2\"></span>, plant and equipment<span class=\"_ _39c\"> </span></span>\u2013  <span class=\"ff70\">Expenditure on operational decarbonisation<span class=\"_ _39c\"> </span></span>\u2013  <span class=\"ff70\">Expenditure to support value chain decarbonisation<span class=\"_ _39c\"> </span></span>Sales, marketing and procurement<span class=\"_ _61\"> </span><span class=\"ff71\">\u2013  </span>Key transition materials and future-facing commodities and the revenue they generate<span class=\"_ _39c\"> </span>\u2013  <span class=\"ff70\">Expenditure to support value chain decarbonisation </span>Closure and rehabilitation<span class=\"_ _26\"> </span><span class=\"ff71\">\u2013  </span>Physical risk impacts on asset carrying values<span class=\"_ _39c\"> </span>\u2013  <span class=\"ff70\">Timing, scope and expected cost of closure and rehabilitation activities<span class=\"_ _39c\"> </span></span>At the date of issue of these Financial Statements, indicators show the appropriate measures are not in place globally to drive decarbonisation at the pace or scale required for the aims of the Paris <span class=\"_ _2\"></span>Agreement to be achieved as the most likely future outcome. <span class=\"_ _2\"></span>As such, the significant judgements and key estimates used in the preparation of these financial statements reflect the Group\u2019s current operational planning cases (described below) which are not currently aligned with a 1.5\u00b0C temperature outcome.<span class=\"_ _39c\"> </span>However<span class=\"_ _2\"></span>, while not the basis of preparation of these financial statements, the Group continues to assess the potential financial statement impacts of the 1.5\u00b0C temperature outcome goal of the Paris <span class=\"_ _2\"></span>Agreement under the Group\u2019s 1.5\u00b0C scenario1<span class=\"_ _39c\"> </span>.<span class=\"_ _39c\"> </span>Future changes to the Group\u2019s climate change strategy or global decarbonisation signposts may impact the Group\u2019s significant judgements and key estimates, and result in material changes to financial results and the carrying values of certain assets and liabilities in future reporting periods. Financial impact of portfolio decisions<span class=\"_ _39c\"> </span>During FY2023, the Group completed the acquisition of OZ Minerals Limited (OZL) and announced the proposed divestment of its interest in the Daunia and Blackwater lower-quality metallurgical coal mines, currently part of the BHP Mitsubishi <span class=\"_ _2\"></span>Alliance (BMA). Further information in respect of the acquisition of OZL<span class=\"_ _2\"></span> is included in note 29 \u2018Business combinations\u2019. Given the timing of the acquisition, the OZL assets will be incorporated into the Group\u2019<span class=\"_ _2\"></span>s climate-related assessments, and associated disclosures, in FY2024 as integration of the business continues. These activities support the continued reshaping of the Group\u2019s portfolio to focus on future-facing commodities, iron ore and higher quality metallurgical coal. They follow the completion, in FY2022, of the merger of the Group\u2019<span class=\"_ _2\"></span>s Petroleum business with Woodside and the divestment of the Group\u2019s interests in BHP Mitsui Coal Pty Ltd (BMC) and the Cerrej\u00f3n non-operated energy coal joint venture. Also in FY2022, the Group announced that it would retain New South W<span class=\"_ _2\"></span>ales Energy Coal (NSWEC) in its portfolio, seek the relevant approvals to continue mining beyond the current consent that expires at the end of FY2026 and proceed with a managed process to cease mining at the asset by the end of FY2030. Following impairments recognised in previous periods, the net carrying value of NSWEC at 30 June 2023 is approximately negative US$220 million comprising property<span class=\"_ _2\"></span>, plant and equipment (PP&amp;E) of approximately US$530 million and closure provisions and other liabilities of approximately US$750 million. <span class=\"_ _2\"></span>As at 30 June 2023, the potential exposure to further impairment for NSWEC is limited to the book value of PP&amp;E of US$530 million, with the forecast cash flows over the proposed operating period supporting the current carrying value. Further<span class=\"_ _2\"></span>, the useful lives of NSWEC PP&amp;E do not exceed the remaining proposed operating period. Impact of transition risks (threats and opportunities) on asset carrying values Significant judgements and key estimates in relation to the preparation of the Financial Statements are impacted by the Group\u2019s current assessment of the range of economic and climate-related conditions that could exist in the world\u2019s transition to a low-carbon economy<span class=\"_ _2a\"></span>, considering the current trajectory of society and the global economy as a whole.<span class=\"_ _39c\"> </span>For example, demand for the Group\u2019s commodities may decrease due to policy<span class=\"_ _2a\"></span>, regulatory (including carbon pricing mechanisms), legal, technological, market or societal responses to climate change, resulting in a proportion of a cash generating unit\u2019s (CGU) reserves becoming incapable of extraction in an economically viable fashion.<span class=\"_ _39c\"> </span>1 <span class=\"_ _42\"> </span> <span class=\"_ _50\"></span>This scenario requires steep global annual emissions reduction, sustained for decades, to stay within a 1.5\u00b0C carbon budget. 1.5\u00b0C is above pre-industrial levels. For more information about the assumptions, outputs and limitations of our 1.5\u00b0C scenario refer to the BHP Climate Change Report 2020 available at <span class=\"fc2\">bhp.com</span>. The Group is preparing an updated 1.5\u00b0C scenario in FY2024.<span class=\"_ _39c\"> </span>T<span class=\"_ _2a\"></span>o support strategic decision making, the Group develops a number of divergent climate scenarios and pathways. In FY2023, the Group\u2019s One Energy View<span class=\"_ _2\"></span>, being the Group\u2019<span class=\"_ _2\"></span>s current estimates of the most likely future states for the global economy and associated sub-systems, was updated to reflect three different pathways under which most developed economies would reach net zero around 2050, with other large economies reaching net zero in 2060 and 2070. While the global gross domestic product assumptions and the pace and drivers of decarbonisation vary across the pathways, each pathway results in a global average temperature increase of around 2\u00b0C by 2100.<span class=\"_ _39c\"> </span>The Group <span class=\"_ _2\"></span>uses <span class=\"_ _2\"></span>the One <span class=\"_ _2\"></span>Energy V<span class=\"_ _2\"></span>iew pathways <span class=\"_ _2\"></span>as inputs <span class=\"_ _2\"></span>to the <span class=\"_ _2\"></span>Group\u2019s <span class=\"_ _2\"></span>operational <span class=\"_ _2\"></span>planning cases <span class=\"_ _2\"></span>as they <span class=\"_ _2\"></span>reflect the <span class=\"_ _2\"></span>Group\u2019s <span class=\"_ _2\"></span>current best <span class=\"_ _2\"></span>estimates <span class=\"_ _2\"></span>of the <span class=\"_ _2\"></span>most<span class=\"_ _0\"></span> likely range of future states for the global economy and associated sub-systems. These pathways inform updates to the Group\u2019<span class=\"_ _2\"></span>s commodity supply and demand<span class=\"_ _0\"></span> outlooks and are used, in conjunction with other market sources of information, to determine the Group\u2019s short and long-term price outlooks. Other sources of information include <span class=\"_ _2\"></span>commodity <span class=\"_ _2\"></span>price forward <span class=\"_ _2\"></span>curves, consensus <span class=\"_ _2\"></span>price outlooks <span class=\"_ _2\"></span>and <span class=\"_ _2\"></span>commodity specific <span class=\"_ _2\"></span>price outlooks <span class=\"_ _2\"></span>sourced from <span class=\"_ _2\"></span>industry <span class=\"_ _2\"></span>analysts.<span class=\"_ _39c\"> </span>Given the complexity and inherent uncertainty of climate modelling, these pathways are reviewed periodically to reflect new information, with a process in place to assess the need to update internal long-term price outlooks for developments in the periods between pathway updates. The Group reflects the operational planning cases and associated price outlooks in the internal valuations used as the basis for the Group\u2019s impairment assessments. The discount rate used in the internal valuations reflects a real post-tax weighted average cost of capital (WACC), including country and state risk premia where appropriate, and ranges from 7.0 per cent to 9.5 per cent across the Group (FY2022: 6.0 per cent to 8.5 per cent). Cash flow forecasts used as the basis for impairment testing include asset specific risks, including climate-related risks such as operational interruptions as a result of physical climate-<span class=\"_ _39c\"> </span>related risks, and therefore the Group does not include a separate climate-related risk adjustment in the Group\u2019s W<span class=\"_ _2\"></span>ACC.<span class=\"_ _39c\"> </span>Physical risk impacts on asset carrying values<span class=\"_ _39c\"> </span>The Group\u2019s operations are exposed to physical climate-related risks. In FY2023, the Group progressed impact evaluations of physical climate-related risks to better understand the potential impacts to site operations, safety<span class=\"_ _2\"></span>, productivity and cost, with these assessments to continue in FY2024.<span class=\"_ _39c\"> </span>The Group\u2019s consideration of potential physical climate-related risk impacts when developing the Group\u2019s operating plans, including factors such as operational interruptions caused by extreme weather events, therefore considers only the Group\u2019s current best estimates of the potential financial impacts of certain climate-related physical risks. Given the complexity of physical risk modelling and the ongoing nature of the Group\u2019s physical risk assessment process, the identification of additional risks and/or the detailed development of the Group\u2019s response may result in material changes to financial results and the carrying values of assets and liabilities in future reporting periods.<span class=\"_ _39c\"> </span>Acquisition of carbon credits and application of carbon pricing assumptions<span class=\"_ _39c\"> </span>The Group\u2019s carbon credits and of<span class=\"_ _2\"></span>fsetting strategy is currently being managed at a consolidated Group level. However<span class=\"_ _2\"></span>, individual investment decisions and asset valuations used for the purposes of impairment testing, consider carbon price assumptions for major Group operational, competitor and customer countries by applying a carbon price to estimated unmitigated Scopes 1 and 2 GHG emissions over the life of the respective operation. In determining the Group\u2019s forecast, factors including a country\u2019<span class=\"_ _2\"></span>s current and announced climate policies, targets and societal factors, such as public acceptance and demographics, are considered. <span class=\"_ _2\"></span>As at the date of these Financial Statements, the carbon price used in asset valuations reflects the following ranges:<span class=\"_ _39c\"> </span>US$ real (January 2022) per tCO2<span class=\"_ _39c\"> </span>FY2030 Low<span class=\"_ _39c\"> </span>FY2030 High<span class=\"_ _39c\"> </span>FY2050 Low<span class=\"_ _39c\"> </span>FY2050 High<span class=\"_ _39c\"> </span>Australia<span class=\"_ _2a1\"> </span>25<span class=\"_ _a\"> </span>75<span class=\"_ _6f\"> </span>150<span class=\"_ _25\"> </span>225<span class=\"_ _39c\"> </span>Brazil<span class=\"_ _2df\"> </span><span class=\"ff70\">5<span class=\"_ _a\"> </span>50<span class=\"_ _6f\"> </span>125<span class=\"_ _25\"> </span>200<span class=\"_ _39c\"> </span></span>Chile<span class=\"_ _162\"> </span>8<span class=\"_ _a\"> </span>41<span class=\"_ _25\"> </span>150<span class=\"_ _6f\"> </span>225<span class=\"_ _39c\"> </span>Canada<span class=\"_ _26c\"> </span>65<span class=\"_ _25\"> </span>102<span class=\"_ _6f\"> </span>200<span class=\"_ _25\"> </span>225<span class=\"_ _39c\"> </span>Key customer countries<span class=\"_ _193\"> </span><span class=\"ff71\">\u2212<span class=\"_ _6f\"> </span></span>175<span class=\"_ _6d\"> </span>25<span class=\"_ _25\"> </span>250<span class=\"_ _39c\"> </span>The Group acquires carbon credits for the purposes of both compliance and possible voluntary surrender or retirement to achieve the Group\u2019s net zero operational GHG emissions long-term goal by CY2050. The Group may also sell to optimise carbon credits depending on internal use requirements or originate carbon credits through project development or direct investment.<span class=\"_ _39c\"> </span>Expenditure on carbon credits during FY2023 amounted to approximately US$15 million. The Group did not voluntarily surrender or retire any carbon credits during FY2023.<span class=\"_ _39c\"> </span>From FY2024, the Group will be subject to the reforms made to <span class=\"_ _2\"></span>Australia\u2019s Safeguard Mechanism in FY2023 which, in ef<span class=\"_ _2\"></span>fect, levy a carbon price for large facilities by requiring the surrender of eligible credits when their Scope 1 emissions exceed a progressively declining legislated limit (known as a baseline). <span class=\"_ _2\"></span>As such, in future reporting periods, the Group may recognise liabilities where an obligation to purchase eligible carbon credits exists and/or intangible assets for carbon credits acquired or generated to meet those obligations.<span class=\"_ _39c\"> </span>Useful economic lives of property<span class=\"_ _2a\"></span>, plant and equipment<span class=\"_ _39c\"> </span>The determination of useful lives of the Group\u2019s PP&amp;E requires judgement, including consideration of the Group\u2019s climate change strategy<span class=\"_ _2a\"></span>, targets and goals, decarbonisation plans and the possible impact of transition risks on demand for the Group\u2019s commodities. Useful lives are reviewed each reporting period, including to ensure they do not exceed the remaining expected operating life of the operation in which they are utilised, and are updated as required. The remaining lives of the Group\u2019s operations reflect the Group\u2019<span class=\"_ _2\"></span>s operational planning cases and their underlying climate-related assumptions. A<span class=\"_ _2\"></span> key component of the Group\u2019s operational decarbonisation strategy is the displacement of diesel within the Group\u2019<span class=\"_ _2\"></span>s operations, particularly the haul truck fleet. The Group is supporting the development of new equipment by original equipment manufacturers, including entering into partnerships focused on the development and trialling of electrical locomotives and haul trucks. While technical and commercial development of the technology needed is progressing, the Group\u2019s operating plans generally assume replacement of haul trucks, and other diesel <span class=\"_ _2\"></span>powered equipment, at the end <span class=\"_ _2\"></span>of their useful lives in <span class=\"_ _2\"></span>line with the Group\u2019s <span class=\"_ _2\"></span>regular fleet renewal programs. For <span class=\"_ _2\"></span>example, a significant proportion of the Group\u2019<span class=\"_ _2\"></span>s current W<span class=\"_ _2\"></span>AIO mining fleet is <span class=\"_ _2\"></span>due for replacement prior to <span class=\"_ _2\"></span>the expected availability of battery <span class=\"_ _2\"></span>electric vehicle solutions. <span class=\"_ _2\"></span>As such, <span class=\"_ _2\"></span>the Group\u2019s decarbonisation <span class=\"_ _2\"></span>plans have not had a <span class=\"_ _2\"></span>material impact on the estimated remaining <span class=\"_ _2\"></span>useful lives of the Group\u2019<span class=\"_ _2\"></span>s existing fleet of <span class=\"_ _2\"></span>assets in FY2023.<span class=\"_ _39c\"> </span>Expenditure on operational decarbonisation<span class=\"_ _39c\"> </span>The Group has set a target to reduce its operational GHG emissions (Scopes 1 and 2 from our operated assets) by at least 30 per cent from the Group\u2019s FY2020 baseline levels by FY2030 and a goal to achieve net zero operational GHG emissions by CY2050.<span class=\"_ _39c\"> </span>Given the timing of the OZ Minerals Limited acquisition, the Group plans to update the baseline for both the Group\u2019s medium-term target and long-<span class=\"_ _39c\"> </span>term goal in FY2024.<span class=\"_ _39c\"> </span>The Group\u2019s operational decarbonisation activities during FY2023 largely focused on the transition of the Group\u2019s electricity supply to renewable sources. The Group also continued to progress projects in relation to displacement of diesel and managing fugitive methane, however expenditure in these areas is expected to increase towards the second half of the decade. A<span class=\"_ _2\"></span> significant proportion of the Group\u2019s renewable electricity is currently sourced through power purchase agreements and judgement is required in determining the appropriate accounting treatment of such arrangements. Depending on the specific terms and conditions, power purchase agreements may be recognised as:<span class=\"_ _39c\"> </span>\u2013  <span class=\"ff70\">an expense when incurred<span class=\"_ _39c\"> </span></span>\u2013  a financial derivative; or \u2013  <span class=\"ff70\">a lease liability<span class=\"_ _2\"></span>, with an associated right of use asset </span>At 30 June 2023, the Group recognised derivatives associated with renewable power purchase agreements (including those signed arrangements in which supply will commence in future periods) with a fair value of approximately US$50 million. No significant leases have been recognised by the Group in relation to renewable power purchase agreements at 30 June 2023.<span class=\"_ _39c\"> </span>Capital expenditure associated with renewable power purchase agreements is generally limited and, given the early stage of development of diesel displacement and management of fugitive methane, capital expenditure on decarbonisation in FY2023 was not material. Capital and operating expenditures associated with projects aimed at contributing to the achievement of the Group\u2019s operational GHG emissions medium-term target and long-term goal have been incorporated into the estimated future cash flows of the Group\u2019s assets. <span class=\"_ _2\"></span>These cash flow estimates form the basis of the Group\u2019s impairment assessments as outlined in further detail in note 13 \u2018Impairment of non-current assets\u2019. Of the total future capital expenditure on operational decarbonisation, the Group expects to spend around US$4 billion (nominal terms) by FY2030, with the majority of decarbonisation capital over this period being spent on diesel-displacement projects2<span class=\"_ _39c\"> </span>. Many of the projects planned to commence before FY2030 are likely to extend beyond the Group\u2019s medium-term target period, and are expected to make a substantial contribution towards the Group\u2019s long-term goal of net zero operational GHG emissions by CY2050. Significant expenditure on fleet renewal at certain assets, for example Olympic Dam, is expected to occur after FY2030.<span class=\"_ _39c\"> </span>As the Group\u2019s climate response is further integrated into business-<span class=\"_ _39c\"> </span>as-usual planning, the spending on climate initiatives is expected to increasingly form part of ordinary course business expenditures. Any change to the Group\u2019s climate change strategy could impact the expected level of expenditure on operational decarbonisation and the associated financial statement significant judgements and key estimates.<span class=\"_ _39c\"> </span>Capex spend FY24 \u2013 FY30 by asset<span class=\"_ _39c\"> </span>2 <span class=\"_ _19f\"> </span> WAIO <span class=\"_ _2e0\"> </span>40% <span class=\"_ _42\"> </span>Escondida<span class=\"ws124\"> 31%</span> <span class=\"_ _42\"> </span>BMA<span class=\"_ _2\"></span><span class=\"ws125\"> 12%</span> <span class=\"_ _42\"> </span>Pampa Norte and Potash<span class=\"lsd3 ws126\"> 11<span class=\"_ _0\"></span>%</span> <span class=\"_ _42\"> </span>Olympic Dam and Nickel W<span class=\"_ _2\"></span>est<span class=\"ws127\"> 6%<span class=\"_ _39c\"> </span></span>Expenditure to support value chain decarbonisation<span class=\"_ _39c\"> </span>The Group continues to invest, including in partnership with others, in potential GHG emissions reduction opportunities in its value chain through technology innovation and development to support reductions to its total reported Scope 3 emissions inventory<span class=\"_ _2\"></span>, with a particular focus on steelmaking and maritime emissions. However<span class=\"_ _2\"></span>, while we seek to influence reduction opportunities, Scope 3 emissions occur outside of our direct control. Reduction pathways are dependent on the development, and upstream or downstream deployment of, solutions and/or supportive policy<span class=\"_ _2\"></span>. Where possible, the financial impact of the Group\u2019s activities in support of the development of Scope 3 reduction pathways is reflected in the financial statements. For example, the Group recognised additional lease liabilities, and associated right of use assets, of US$90 million during FY2023 when chartering of the Group\u2019s new dual-fuelled LNG vessels. Further detail of the Group\u2019<span class=\"_ _2\"></span>s leases is provided in note 22 \u2018Leases\u2019. It is, however<span class=\"_ _2\"></span>, currently not possible to reliably estimate or measure the full potential financial statement impacts of the Group\u2019s pursuit of its Scope 3 goals and targets. Key transition materials and future-facing commodities, and the revenue they generate<span class=\"_ _39c\"> </span>There is no agreed or established approach to defining revenue from commodities that are key to the transition to a low-carbon economy<span class=\"_ _2\"></span>. The investor-led initiative Climate <span class=\"_ _2\"></span>Action 100+ is developing a Diversified Mining Net Zero Standard with the draft Standard defining key transition materials. The FTSE Green Revenues Classification System is a taxonomy designed by FTSE Russell to better identify products and services contributing to the transition to a low-carbon economy<span class=\"_ _2\"></span>.<span class=\"_ _39c\"> </span>Applying the Climate <span class=\"_ _2\"></span>Action 100+ draft Standard definitions and the FTSE Russel taxonomy would result in the Group classifying copper<span class=\"_ _2\"></span>, nickel and uranium as key transition materials. FY2023 revenue for these commodities was US$14.9 billion, US$1.9 billion (comprised of Battery-<span class=\"_ _39c\"> </span>suitable3 US$1.0 billion and Other US$0.9 billion) and US$0.4 billion respectively<span class=\"_ _2\"></span>. (FY2022: US$16.0 billion, US$1.7 billion and US$0.2 billion, respectively).<span class=\"_ _39c\"> </span>2 <span class=\"_ _42\"> </span>Based on latest business plans and excluding recently acquired OZL assets. In respect of diesel-displacement, amounts included in the US$4 billion reflect incremental estimated spend above internal combustion engine replacement costs and supporting site infrastructure. 3 <span class=\"_ _42\"> </span>Battery-suitable nickel is defined as nickel briquettes, nickel powder and nickel sulphate. It does not include off-specification nickel metal. Calculated based on gross revenue from battery suitable nickel multiplied by percentage of BHP\u2019s sales of battery-suitable nickel, as applicable to battery material suppliers. Where a customer\u2019s planned end use is not known with certainty to be for battery supply<span class=\"_ _2\"></span>, assumptions of usage have been made using historical nickel usage for Timing and expected cost of closure and rehabilitation activities<span class=\"_ _39c\"> </span>The extent, cost and timing of the Group\u2019s future closure activities may be impacted by potential physical climate-related impacts. In estimating the potential cost of closure activities, the Group considers factors such as long-term weather outlooks, for example forecast changes in rainfall patterns. Closure cost estimates also consider the impact of the Group\u2019s climate change strategy on the costs and timing of performing closure activities and the impact of new technology where appropriately developed and tested. For example, closure cost estimates largely continue to reflect the use of existing fuel sources for the Group\u2019s equipment while the Group continues to invest in the development of alternative fuel sources and fleet electrification.<span class=\"_ _39c\"> </span>The estimated cost of closure activities includes management\u2019s current best estimate in relation to post-closure monitoring and maintenance, which may be required for significant periods beyond the completion of other closure activities and is therefore exposed to potential long-term climate-related impacts. While reflecting management\u2019s current best estimate, the cost of post-closure monitoring and maintenance may change in future reporting periods as the understanding of, and potential long-term impacts from, climate change continue to evolve.<span class=\"_ _39c\"> </span>Given the long-lived nature of the majority of the Group\u2019s assets, the majority of final closure activities are not expected to occur for a significant period of time. However<span class=\"_ _2\"></span>, acknowledging the wide range of potential energy transition impacts for metallurgical coal demand, and for illustrative purposes only<span class=\"_ _2\"></span>, a five-year acceleration in forecast cash flows relating to the Group\u2019s metallurgical coal closure and rehabilitation provisions, in isolation, would be estimated to result in an increase to the provision of approximately 15 per cent, which approximates to US$250 million. Further<span class=\"_ _2\"></span>, while the Group\u2019s NSWEC closure provision remains subject to estimation and assumptions, the timing of closure is no longer considered materially susceptible to potential long-term climate-related impacts. More detail on the key judgements and estimates impacting the Group\u2019s closure and rehabilitation provisions is presented in note 15 \u2018Closure and rehabilitation provisions\u2019. Paris <span class=\"_ _2\"></span>Agreement and 1.5\u00b0C scenarios<span class=\"_ _39c\"> </span>As governments, institutions, companies, and society increasingly focus on addressing climate change, the potential for a non-linear and/or more rapid transition and the subsequent impact on climate-related threats and opportunities increases. Accordingly<span class=\"_ _2\"></span>, in addition to the operational planning cases, the Group utilises a range of scenarios, including its 1.5\u00b0C scenario, when testing the resilience of its portfolio, forming strategy and making investment decisions.<span class=\"_ _39c\"> </span>The Group continues to monitor global decarbonisation signposts and updates its operational planning cases, price outlooks and cost of carbon assumptions and assessments relating to strategy and capital allocation accordingly<span class=\"_ _2\"></span>. When such signposts indicate the appropriate measures are in place for achievement of a 1.5\u00baC scenario, this will be reflected in the Group\u2019s operational planning cases. Capital allocation<span class=\"_ _39c\"> </span>While a 1.5\u00b0C scenario does not currently represent one of the inputs to the Group\u2019s operational planning cases, the Group has systematically integrated its 1.5\u00b0C scenario into the Group\u2019s strategy and capital allocation process to test the extent to which its capital allocation is aligned with a rapidly decarbonising global economy<span class=\"_ _2\"></span>. Specifically<span class=\"_ _2\"></span>, in addition to consideration of the Group\u2019<span class=\"_ _2\"></span>s operational planning cases, the Group applies its 1.5\u00b0C scenario to assess whether future demand for the Group\u2019s products supports ongoing capital investment. The internal allocation of capital under the Group\u2019s Capital <span class=\"_ _2\"></span>Allocation Framework and all major investment decisions continue to require an assessment of investment viability under the Group\u2019s 1.5\u00b0C scenario. Integration of the Group\u2019s 1.5\u00b0C scenario into the capital allocation process is intended to mitigate the risk of stranded assets, and associated impairments, should the appropriate global measures to achieve a 1.5\u00b0C outcome be adopted.<span class=\"_ _39c\"> </span>Demand for the Group\u2019s commodities impacting price outlooks<span class=\"_ _39c\"> </span>The Group acknowledges that there are a range of possible energy transition scenarios, including those that are aligned with the aims of the Paris <span class=\"_ _2\"></span>Agreement, that may indicate different outcomes for individual commodities. The Group examines the resilience of its portfolio to a 1.5\u00b0C scenario (the Group\u2019s 1.5\u00b0C scenario) on an ongoing basis by considering the impact of commodity price estimates under that scenario using the Group\u2019s latest operating plans.<span class=\"_ _39c\"> </span>There are inherent limitations with scenario analysis and it is difficult to predict which, if any<span class=\"_ _2\"></span>, of the scenarios might eventuate and none of the scenarios considered constitutes a definitive outcome for the Group. However<span class=\"_ _2\"></span>, the long-term commodity price estimates under the Group\u2019s 1.5\u00b0C scenario reflect the world needing more steel, copper<span class=\"_ _2\"></span>, potash and nickel in the next 30 years when compared to the last 30 years. In addition, the Group\u2019s portfolio is transitioning towards higher quality iron ore and metallurgical coal that enable steelmakers to be more efficient and operate with a lower GHG emissions intensity<span class=\"_ _2\"></span>. The Group considers that is it currently impracticable to fully assess all potential Financial Statement impacts under the Group\u2019s 1.5\u00b0C scenario. However<span class=\"_ _2\"></span>, the Group has carried out analysis which indicates that the long-term commodity price outlooks under this scenario for iron ore, copper<span class=\"_ _2\"></span>, metallurgical coal, nickel and potash are either largely consistent with or favourable to the price outlooks in the Group\u2019s current operational planning cases. Given these positive long-term price outlooks, price-only sensitivities to the Group\u2019s long-term 1.5\u00b0C price outlook indicate that there would not be any asset impairments for those commodities. Further<span class=\"_ _2\"></span>, acknowledging the wide range of potential energy transition impacts for metallurgical coal demand, the Group has also performed additional price-only sensitivities for the Group\u2019s metallurgical coal assets. These price-only sensitivities reflect dif<span class=\"_ _2\"></span>ferent price outlooks while assuming that all other factors in the asset valuations, such as production and sales volumes, capital and operating expenditures, carbon pricing and the discount rate, remain unchanged from those used in the Group\u2019s FY2023 metallurgical coal impairment assessments. <span class=\"_ _2\"></span>As such, the sensitivities do not attempt to assess all potential financial statement impacts, including impacts on asset valuations, that may arise under the Group\u2019s 1.5\u00b0C scenario.<span class=\"_ _39c\"> </span>Under the Group\u2019s operational planning case assumptions, headroom in excess of US$6.5 billion currently exists between the carrying value of the Group\u2019s metallurgical coal assets and their estimated valuation. <span class=\"_ _2\"></span>As such, these sensitivities indicate that adverse movements in long-term price assumptions, in isolation, would reduce the current headroom on the Group\u2019s metallurgical coal assets but, given the current headroom, may not result in an impairment.<span class=\"_ _39c\"> </span>Price-only sensitivities reflect the following price outlooks published in August 2022 by Wood Mackenzie, a research and consultancy business for the global energy<span class=\"_ _2\"></span>, power and renewables, subsurface, chemicals, and metals and mining industries:<span class=\"_ _39c\"> </span>Price source<span class=\"_ _39c\"> </span>CY2030 Price (real, US$/<span class=\"_ _39c\"> </span>tonne)<span class=\"_ _39c\"> </span>CY2050 Price (real, US$/<span class=\"_ _39c\"> </span>tonne)<span class=\"_ _39c\"> </span>Base case<span class=\"_ _190\"> </span>159<span class=\"_ _25\"> </span>170<span class=\"_ _39c\"> </span>1.5\u00b0C scenario<span class=\"_ _2e1\"> </span>127<span class=\"_ _25\"> </span>135<span class=\"_ _39c\"> </span>No impairment is indicated by these price-only sensitivities.<span class=\"_ _39c\"> </span>The Group does not disclose the Group\u2019s internally generated long-term price outlooks for individual commodities, including those under the Group\u2019s 1.5\u00b0C scenario, given their commercial sensitivity<span class=\"_ _2a\"></span>.<span class=\"_ _39c\"> </span>",
   "dimensions": {
    "concept": "bhp:DisclosureOfClimateChange",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-668": {
   "value": "17  Share capital BHP Group Limited BHP Group Plc 2023  shares 2022  shares 2021  shares 2022  shares 2021  shares Share capital issued Opening number of shares 5,062,323,190 2,945,851,394 2,945,851,394 2,112,071,796 2,112,071,796 Issue of shares 3,497,366 4,400,000  \u2212  \u2212  \u2212 Corporate structure unification \u2212 2,112,071,796  \u2212 (2,112,071,796)  \u2212 Purchase of shares by ESOP Trusts (6,442,571) (8,704,669) (7,587,353) (63,567) (185,054) Employee share awards exercised following vesting 6,081,843 8,522,684 6,948,683 77,748 173,644 Movement in treasury shares under Employee Share Plans 360,728 181,985 638,670 (14,181) 11,410 Closing number of shares 5,065,820,556 5,062,323,190 2,945,851,394  \u2212 2,112,071,796 Comprising: Shares held by the public 5,064,408,782 5,061,272,144 2,944,982,333  \u2212 2,112,057,615 Treasury shares 1,411,774 1,051,046 869,061  \u2212 14,181 Other share classes 5.5% Preference shares of \u00a31 each \u2013  \u2212  \u2212  \u2212 50,000 Special Voting share of no par value \u2013  \u2212 1  \u2212  \u2212 Special Voting share of US$0.50 par value \u2013  \u2212  \u2212  \u2212 1 DLC Dividend share \u2013  \u2212 1  \u2212  \u2212 During FY2023, BHP Group Limited issued 3,497,366 fully paid ordinary shares to the BHP Group Limited Employee Equity Trust and to Solium Capital (Australia) Pty Ltd at A$40.51 per share (2022: 4,400,000 fully paid ordinary shares at A$52.99 per share), to satisfy the vesting of employee share awards and related dividend equivalent entitlements under those employee share plans. Share capital of BHP Group Limited at 30 June 2023 is composed of the following categories of shares: Ordinary shares fully paid Treasury shares Each fully paid ordinary share of BHP Group Limited carries the right to one vote at a meeting of the Company. Treasury shares are fully paid ordinary shares of BHP Group Limited that are held by the ESOP Trusts for the purpose of issuing shares to employees under the Group\u2019s Employee Share Plans. Treasury shares are recognised at cost and deducted from equity, net of any income tax effects. When the treasury shares are subsequently sold or reissued, any consideration received, net of any directly attributable costs and income tax effects, is recognised as an increase in equity. Any difference between the carrying amount and the consideration, if reissued, is recognised in retained earnings. As a result of the corporate structure unification on 31 January 2022, 2,112,071,796 fully paid ordinary shares in BHP Group Limited were issued to BHP Group Plc shareholders in a one for one exchange of their BHP Group Plc ordinary shares, resulting in BHP Group Limited becoming the sole parent company of the Group with a single set of shareholders. The following classes of shares existed prior to the Group\u2019s unification on 31 January 2022: Special Voting shares Preference shares  DLC Dividend share Each of BHP Group Limited and BHP Group Plc had issued one Special Voting share to facilitate joint voting by shareholders of BHP Group Limited and BHP Group Plc on Joint Electorate Actions. These shares were bought back for nominal value in January 2022 and subsequently cancelled. Preference shares had the right to repayment of the amount paid up on the nominal value and any unpaid dividends in priority to the holders of any other class of shares in BHP Group Plc on a return of capital or winding up. These shares were acquired by way of gift from J.P. Morgan and subsequently cancelled on 31 January 2022. The DLC Dividend share supported the Dual Listed Company (DLC) equalisation principles in place since the merger in 2001, including the requirement that ordinary shareholders of BHP Group Plc and BHP Group Limited were paid equal cash dividends per share. This share enabled efficient and flexible capital management across the DLC and was issued on 23 February 2016 at par value of US$10. This share was bought back for nominal value in January 2022 and subsequently cancelled. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTreasurySharesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-633": {
   "value": "17  Share capital BHP Group Limited BHP Group Plc 2023  shares 2022  shares 2021  shares 2022  shares 2021  shares Share capital issued Opening number of shares 5,062,323,190 2,945,851,394 2,945,851,394 2,112,071,796 2,112,071,796 Issue of shares 3,497,366 4,400,000  \u2212  \u2212  \u2212 Corporate structure unification \u2212 2,112,071,796  \u2212 (2,112,071,796)  \u2212 Purchase of shares by ESOP Trusts (6,442,571) (8,704,669) (7,587,353) (63,567) (185,054) Employee share awards exercised following vesting 6,081,843 8,522,684 6,948,683 77,748 173,644 Movement in treasury shares under Employee Share Plans 360,728 181,985 638,670 (14,181) 11,410 Closing number of shares 5,065,820,556 5,062,323,190 2,945,851,394  \u2212 2,112,071,796 Comprising: Shares held by the public 5,064,408,782 5,061,272,144 2,944,982,333  \u2212 2,112,057,615 Treasury shares 1,411,774 1,051,046 869,061  \u2212 14,181 Other share classes 5.5% Preference shares of \u00a31 each \u2013  \u2212  \u2212  \u2212 50,000 Special Voting share of no par value \u2013  \u2212 1  \u2212  \u2212 Special Voting share of US$0.50 par value \u2013  \u2212  \u2212  \u2212 1 DLC Dividend share \u2013  \u2212 1  \u2212  \u2212 During FY2023, BHP Group Limited issued 3,497,366 fully paid ordinary shares to the BHP Group Limited Employee Equity Trust and to Solium Capital (Australia) Pty Ltd at A$40.51 per share (2022: 4,400,000 fully paid ordinary shares at A$52.99 per share), to satisfy the vesting of employee share awards and related dividend equivalent entitlements under those employee share plans. Share capital of BHP Group Limited at 30 June 2023 is composed of the following categories of shares: Ordinary shares fully paid Treasury shares Each fully paid ordinary share of BHP Group Limited carries the right to one vote at a meeting of the Company. Treasury shares are fully paid ordinary shares of BHP Group Limited that are held by the ESOP Trusts for the purpose of issuing shares to employees under the Group\u2019s Employee Share Plans. Treasury shares are recognised at cost and deducted from equity, net of any income tax effects. When the treasury shares are subsequently sold or reissued, any consideration received, net of any directly attributable costs and income tax effects, is recognised as an increase in equity. Any difference between the carrying amount and the consideration, if reissued, is recognised in retained earnings. As a result of the corporate structure unification on 31 January 2022, 2,112,071,796 fully paid ordinary shares in BHP Group Limited were issued to BHP Group Plc shareholders in a one for one exchange of their BHP Group Plc ordinary shares, resulting in BHP Group Limited becoming the sole parent company of the Group with a single set of shareholders. The following classes of shares existed prior to the Group\u2019s unification on 31 January 2022: Special Voting shares Preference shares  DLC Dividend share Each of BHP Group Limited and BHP Group Plc had issued one Special Voting share to facilitate joint voting by shareholders of BHP Group Limited and BHP Group Plc on Joint Electorate Actions. These shares were bought back for nominal value in January 2022 and subsequently cancelled. Preference shares had the right to repayment of the amount paid up on the nominal value and any unpaid dividends in priority to the holders of any other class of shares in BHP Group Plc on a return of capital or winding up. These shares were acquired by way of gift from J.P. Morgan and subsequently cancelled on 31 January 2022. The DLC Dividend share supported the Dual Listed Company (DLC) equalisation principles in place since the merger in 2001, including the requirement that ordinary shareholders of BHP Group Plc and BHP Group Limited were paid equal cash dividends per share. This share enabled efficient and flexible capital management across the DLC and was issued on 23 February 2016 at par value of US$10. This share was bought back for nominal value in January 2022 and subsequently cancelled. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIssuedCapitalExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-701": {
   "value": "BHP Group Limited BHP Group Plc 2023  shares 2022  shares 2021  shares 2022  shares 2021  shares Share capital issued Opening number of shares 5,062,323,190 2,945,851,394 2,945,851,394 2,112,071,796 2,112,071,796 Issue of shares 3,497,366 4,400,000  \u2212  \u2212  \u2212 Corporate structure unification \u2212 2,112,071,796  \u2212 (2,112,071,796)  \u2212 Purchase of shares by ESOP Trusts (6,442,571) (8,704,669) (7,587,353) (63,567) (185,054) Employee share awards exercised following vesting 6,081,843 8,522,684 6,948,683 77,748 173,644 Movement in treasury shares under Employee Share Plans 360,728 181,985 638,670 (14,181) 11,410 Closing number of shares 5,065,820,556 5,062,323,190 2,945,851,394  \u2212 2,112,071,796 Comprising: Shares held by the public 5,064,408,782 5,061,272,144 2,944,982,333  \u2212 2,112,057,615 Treasury shares 1,411,774 1,051,046 869,061  \u2212 14,181 Other share classes 5.5% Preference shares of \u00a31 each \u2013  \u2212  \u2212  \u2212 50,000 Special Voting share of no par value \u2013  \u2212 1  \u2212  \u2212 Special Voting share of US$0.50 par value \u2013  \u2212  \u2212  \u2212 1 DLC Dividend share \u2013  \u2212 1  \u2212  \u2212 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfClassesOfShareCapitalExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-743": {
   "value": "Share capital of BHP Group Limited at 30 June 2023 is composed of the following categories of shares: Ordinary shares fully paid Treasury shares Each fully paid ordinary share of BHP Group Limited carries the right to one vote at a meeting of the Company. Treasury shares are fully paid ordinary shares of BHP Group Limited that are held by the ESOP Trusts for the purpose of issuing shares to employees under the Group\u2019s Employee Share Plans. Treasury shares are recognised at cost and deducted from equity, net of any income tax effects. When the treasury shares are subsequently sold or reissued, any consideration received, net of any directly attributable costs and income tax effects, is recognised as an increase in equity. Any difference between the carrying amount and the consideration, if reissued, is recognised in retained earnings. The following classes of shares existed prior to the Group\u2019s unification on 31 January 2022: Special Voting shares Preference shares  DLC Dividend share Each of BHP Group Limited and BHP Group Plc had issued one Special Voting share to facilitate joint voting by shareholders of BHP Group Limited and BHP Group Plc on Joint Electorate Actions. These shares were bought back for nominal value in January 2022 and subsequently cancelled. Preference shares had the right to repayment of the amount paid up on the nominal value and any unpaid dividends in priority to the holders of any other class of shares in BHP Group Plc on a return of capital or winding up. These shares were acquired by way of gift from J.P. Morgan and subsequently cancelled on 31 January 2022. The DLC Dividend share supported the Dual Listed Company (DLC) equalisation principles in place since the merger in 2001, including the requirement that ordinary shareholders of BHP Group Plc and BHP Group Limited were paid equal cash dividends per share. This share enabled efficient and flexible capital management across the DLC and was issued on 23 February 2016 at par value of US$10. This share was bought back for nominal value in January 2022 and subsequently cancelled. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIssuedCapitalExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-765": {
   "value": "Share capital of BHP Group Limited at 30 June 2023 is composed of the following categories of shares: Ordinary shares fully paid Treasury shares Each fully paid ordinary share of BHP Group Limited carries the right to one vote at a meeting of the Company. Treasury shares are fully paid ordinary shares of BHP Group Limited that are held by the ESOP Trusts for the purpose of issuing shares to employees under the Group\u2019s Employee Share Plans. Treasury shares are recognised at cost and deducted from equity, net of any income tax effects. When the treasury shares are subsequently sold or reissued, any consideration received, net of any directly attributable costs and income tax effects, is recognised as an increase in equity. Any difference between the carrying amount and the consideration, if reissued, is recognised in retained earnings. The following classes of shares existed prior to the Group\u2019s unification on 31 January 2022: Special Voting shares Preference shares  DLC Dividend share Each of BHP Group Limited and BHP Group Plc had issued one Special Voting share to facilitate joint voting by shareholders of BHP Group Limited and BHP Group Plc on Joint Electorate Actions. These shares were bought back for nominal value in January 2022 and subsequently cancelled. Preference shares had the right to repayment of the amount paid up on the nominal value and any unpaid dividends in priority to the holders of any other class of shares in BHP Group Plc on a return of capital or winding up. These shares were acquired by way of gift from J.P. Morgan and subsequently cancelled on 31 January 2022. The DLC Dividend share supported the Dual Listed Company (DLC) equalisation principles in place since the merger in 2001, including the requirement that ordinary shareholders of BHP Group Plc and BHP Group Limited were paid equal cash dividends per share. This share enabled efficient and flexible capital management across the DLC and was issued on 23 February 2016 at par value of US$10. This share was bought back for nominal value in January 2022 and subsequently cancelled. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForTreasurySharesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-669": {
   "value": "18  Other equity 2023  US$M 2022  US$M 2021  US$M Recognition and measurement Share premium account  \u2212  \u2212 518 The share premium account represented the premium paid on the issue of BHP Group Plc shares recognised in accordance with the UK Companies Act 2006. It was transferred to the common control reserve as part of the unification of the Group's corporate structure. Capital redemption reserve  \u2212  \u2212 177 The capital redemption reserve represented the par value of BHP Group Plc shares that were purchased and subsequently cancelled. It was transferred to the common control reserve as part of unification of the Group's corporate structure. Common control reserve (1,603) (1,603)  \u2212 The common control reserve arose on unification of the Group\u2019s corporate structure and represents the residual on consolidation between BHP Group Ltd\u2019s investment in BHP Group Plc (now known as BHP Group (UK) Ltd) and BHP Group Plc\u2019s share capital, share premium and capital redemption reserve at the time of unification. Employee share awards reserve 171 174 268 The employee share awards reserve represents the accrued employee entitlements to share awards that have been charged to the income statement and have not yet been exercised. Once exercised, the difference between the accumulated fair value of the awards and their historical on-market purchase price is recognised in retained earnings. Cash flow hedge reserve 10 41 100 The cash flow hedge reserve represents hedging gains and losses recognised on the effective portion of cash flow hedges. The cumulative deferred gain or loss on the hedge is recognised in the income statement when the hedged transaction impacts the income statement, or is recognised as an adjustment to the cost of non-financial hedged items. The hedging reserve records the portion of the gain or loss on a hedging instrument in a cash flow hedge that is determined to be an effective hedge relationship. Cost of hedging reserve (1) (19) (54) The cost of hedging reserve represents the recognition of certain costs of hedging for example, basis adjustments, which have been excluded from the hedging relationship and deferred in other comprehensive income until the hedged transaction impacts the income statement. Foreign currency translation reserve (14) (14) 43 The foreign currency translation reserve represents exchange differences arising from the translation of non-US dollar functional currency operations within the Group into US dollars. Equity investments reserve 9 (8) 15 The equity investment reserve represents the revaluation of investments in shares recognised through other comprehensive income. Where a revalued financial asset is sold, the relevant portion of the reserve is transferred to retained earnings. Non-controlling interest contribution reserve 1,441 1,441 1,283 The non-controlling interest contribution reserve represents the excess of consideration received over the book value of net assets attributable to equity instruments when acquired by non-controlling interests. Total reserves 13 12 2,350 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfReservesAndOtherEquityInterestExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-634": {
   "value": "18  Other equity 2023  US$M 2022  US$M 2021  US$M Recognition and measurement Share premium account  \u2212  \u2212 518 The share premium account represented the premium paid on the issue of BHP Group Plc shares recognised in accordance with the UK Companies Act 2006. It was transferred to the common control reserve as part of the unification of the Group's corporate structure. Capital redemption reserve  \u2212  \u2212 177 The capital redemption reserve represented the par value of BHP Group Plc shares that were purchased and subsequently cancelled. It was transferred to the common control reserve as part of unification of the Group's corporate structure. Common control reserve (1,603) (1,603)  \u2212 The common control reserve arose on unification of the Group\u2019s corporate structure and represents the residual on consolidation between BHP Group Ltd\u2019s investment in BHP Group Plc (now known as BHP Group (UK) Ltd) and BHP Group Plc\u2019s share capital, share premium and capital redemption reserve at the time of unification. Employee share awards reserve 171 174 268 The employee share awards reserve represents the accrued employee entitlements to share awards that have been charged to the income statement and have not yet been exercised. Once exercised, the difference between the accumulated fair value of the awards and their historical on-market purchase price is recognised in retained earnings. Cash flow hedge reserve 10 41 100 The cash flow hedge reserve represents hedging gains and losses recognised on the effective portion of cash flow hedges. The cumulative deferred gain or loss on the hedge is recognised in the income statement when the hedged transaction impacts the income statement, or is recognised as an adjustment to the cost of non-financial hedged items. The hedging reserve records the portion of the gain or loss on a hedging instrument in a cash flow hedge that is determined to be an effective hedge relationship. Cost of hedging reserve (1) (19) (54) The cost of hedging reserve represents the recognition of certain costs of hedging for example, basis adjustments, which have been excluded from the hedging relationship and deferred in other comprehensive income until the hedged transaction impacts the income statement. Foreign currency translation reserve (14) (14) 43 The foreign currency translation reserve represents exchange differences arising from the translation of non-US dollar functional currency operations within the Group into US dollars. Equity investments reserve 9 (8) 15 The equity investment reserve represents the revaluation of investments in shares recognised through other comprehensive income. Where a revalued financial asset is sold, the relevant portion of the reserve is transferred to retained earnings. Non-controlling interest contribution reserve 1,441 1,441 1,283 The non-controlling interest contribution reserve represents the excess of consideration received over the book value of net assets attributable to equity instruments when acquired by non-controlling interests. Total reserves 13 12 2,350 Summarised financial information relating to each of the Group\u2019s subsidiaries with non-controlling interests (NCI) that are material to the Group before any intra-group eliminations is shown below: US$M 2023 2022 Minera Escondida Limitada Other individually immaterial subsidiaries (incl. intra-group eliminations) Total Minera Escondida Limitada Other individually immaterial subsidiaries (incl. intra-group eliminations) Total Group share (per cent) 57.5 57.5 Current assets 3,144 2,929 Non-current assets 12,160 11,636 Current liabilities (1,598) (2,192) Non-current liabilities (5,413) (4,762) Net assets 8,293 7,611 Net assets attributable to NCI  3,525 509 4,034 3,235 574 3,809 Revenue 8,847 9,500 Profit after taxation 2,365 3,522 Other comprehensive income (8) 11 Total comprehensive income 2,357 3,533 Profit after taxation attributable to NCI 1,005 398 1,403 1,497 658 2,155 Other comprehensive income attributable to NCI (3)  \u2212 (3) 5  \u2212 5 Net operating cash flow  3,168 4,519 Net investing cash flow  (1,351) (860) Net financing cash flow  (1,620) (4,029) Dividends paid to NCI 712 463 1,175 1,760 780 2,540 While the Group controls Minera Escondida Limitada, the non-controlling interests hold certain protective rights that restrict the Group\u2019s ability to sell assets held by Minera Escondida Limitada, or use the assets in other subsidiaries and operations owned by the Group. Minera Escondida Limitada is also restricted from paying dividends without the approval of the non-controlling interests. ",
   "dimensions": {
    "concept": "bhp:DisclosureOfReservesAndOtherEquityInterest",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-744": {
   "value": "2023  US$M 2022  US$M 2021  US$M Recognition and measurement Share premium account  \u2212  \u2212 518 The share premium account represented the premium paid on the issue of BHP Group Plc shares recognised in accordance with the UK Companies Act 2006. It was transferred to the common control reserve as part of the unification of the Group's corporate structure. Capital redemption reserve  \u2212  \u2212 177 The capital redemption reserve represented the par value of BHP Group Plc shares that were purchased and subsequently cancelled. It was transferred to the common control reserve as part of unification of the Group's corporate structure. Common control reserve (1,603) (1,603)  \u2212 The common control reserve arose on unification of the Group\u2019s corporate structure and represents the residual on consolidation between BHP Group Ltd\u2019s investment in BHP Group Plc (now known as BHP Group (UK) Ltd) and BHP Group Plc\u2019s share capital, share premium and capital redemption reserve at the time of unification. Employee share awards reserve 171 174 268 The employee share awards reserve represents the accrued employee entitlements to share awards that have been charged to the income statement and have not yet been exercised. Once exercised, the difference between the accumulated fair value of the awards and their historical on-market purchase price is recognised in retained earnings. Cash flow hedge reserve 10 41 100 The cash flow hedge reserve represents hedging gains and losses recognised on the effective portion of cash flow hedges. The cumulative deferred gain or loss on the hedge is recognised in the income statement when the hedged transaction impacts the income statement, or is recognised as an adjustment to the cost of non-financial hedged items. The hedging reserve records the portion of the gain or loss on a hedging instrument in a cash flow hedge that is determined to be an effective hedge relationship. Cost of hedging reserve (1) (19) (54) The cost of hedging reserve represents the recognition of certain costs of hedging for example, basis adjustments, which have been excluded from the hedging relationship and deferred in other comprehensive income until the hedged transaction impacts the income statement. Foreign currency translation reserve (14) (14) 43 The foreign currency translation reserve represents exchange differences arising from the translation of non-US dollar functional currency operations within the Group into US dollars. Equity investments reserve 9 (8) 15 The equity investment reserve represents the revaluation of investments in shares recognised through other comprehensive income. Where a revalued financial asset is sold, the relevant portion of the reserve is transferred to retained earnings. Non-controlling interest contribution reserve 1,441 1,441 1,283 The non-controlling interest contribution reserve represents the excess of consideration received over the book value of net assets attributable to equity instruments when acquired by non-controlling interests. Total reserves 13 12 2,350 ",
   "dimensions": {
    "concept": "bhp:DescriptionOfAccountingPolicyForOtherEquity",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-670": {
   "value": "Summarised financial information relating to each of the Group\u2019s subsidiaries with non-controlling interests (NCI) that are material to the Group before any intra-group eliminations is shown below: US$M 2023 2022 Minera Escondida Limitada Other individually immaterial subsidiaries (incl. intra-group eliminations) Total Minera Escondida Limitada Other individually immaterial subsidiaries (incl. intra-group eliminations) Total Group share (per cent) 57.5 57.5 Current assets 3,144 2,929 Non-current assets 12,160 11,636 Current liabilities (1,598) (2,192) Non-current liabilities (5,413) (4,762) Net assets 8,293 7,611 Net assets attributable to NCI  3,525 509 4,034 3,235 574 3,809 Revenue 8,847 9,500 Profit after taxation 2,365 3,522 Other comprehensive income (8) 11 Total comprehensive income 2,357 3,533 Profit after taxation attributable to NCI 1,005 398 1,403 1,497 658 2,155 Other comprehensive income attributable to NCI (3)  \u2212 (3) 5  \u2212 5 Net operating cash flow  3,168 4,519 Net investing cash flow  (1,351) (860) Net financing cash flow  (1,620) (4,029) Dividends paid to NCI 712 463 1,175 1,760 780 2,540 While the Group controls Minera Escondida Limitada, the non-controlling interests hold certain protective rights that restrict the Group\u2019s ability to sell assets held by Minera Escondida Limitada, or use the assets in other subsidiaries and operations owned by the Group. Minera Escondida Limitada is also restricted from paying dividends without the approval of the non-controlling interests. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfNoncontrollingInterestsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-635": {
   "value": "19 Dividends Year ended 30 June 2023 Year ended 30 June 2022 Year ended 30 June 2021 Per share  US cents Total  US$M Per share  US cents Total  US$M Per share US cents Total  US$M Dividends paid during the period1 Prior year final dividend  175 8,858 200 10,119 55 2,779 Interim dividend 90 4,562 150 7,601 101 5,115 265 13,420 350 17,720 156 7,894 1  5.5 per cent dividend on 50,000 preference shares of \u00a31 each determined and paid for financial year 2021. No dividend paid for the financial year 2022. These preference shares were cancelled on 31 January 2022. Dividends paid during the period differs from the amount of dividends paid in the Consolidated Cash Flow Statement as a result of foreign exchange gains and losses relating to the timing of equity distributions between the record date and the payment date. Additional derivative settlements of US$161 million were made as part of the funding of the dividend paid during the period and is disclosed in Proceeds/(settlements) of cash management related instruments in the Consolidated Cash Flow Statement. Each American Depositary Share (ADS) represents two ordinary shares of BHP Group Limited. Dividends determined on each ADS represent twice the dividend determined on each BHP Group Limited ordinary share. Dividends are determined after period-end and announced with the results for the period. Interim dividends are determined in February and paid in March. Final dividends are determined in August and paid in September. Dividends determined are not recorded as a liability at the end of the period to which they relate. Subsequent to year-end, on 22 August 2023, BHP Group Limited determined a final dividend of 80 US cents per share (US$4,052 million), which will be paid on 28 September 2023 (30 June 2022: final dividend of 175 US cents per share \u2013 US$8,857 million; 30 June 2021: final dividend of 200 US cents per share \u2013 US$10,114 million). BHP Group Limited dividends for all periods presented are, or will be, fully franked based on a tax rate of 30 per cent. 2023  US$M 2022  US$M 2021  US$M Franking credits as at 30 June 7,953 7,007 14,302 Franking credits arising on the future payment/(refund) of taxes relating to the period (261) 2,043 1,799 Total franking credits available 1 7,692 9,050 16,101 1  The payment of the final 2023 dividend determined after 30 June 2023 will reduce the franking account balance by US$1,737 million. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDividendsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-671": {
   "value": "20  Provisions for dividends and other liabilities The disclosure below excludes closure and rehabilitation provisions (refer to note 15 \u2018Closure and rehabilitation provisions\u2019), employee benefits, restructuring and post-retirement employee benefits provisions (refer to note 27 \u2018Employee benefits, restructuring and post-retirement employee benefits provisions\u2019) and provisions related to the Samarco dam failure (refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019). 2023  US$M 2022  US$M At the beginning of the financial year 674 581 Acquisition of subsidiaries and operations 1 61 \u2013 Dividends determined 13,420 17,720 Charge/(credit) for the year: Underlying 156 493 Discounting 2 1 Exchange variations (161) 122 Released during the year (62) (48) Utilisation (35) (96) Dividends paid (13,268) (17,851) Divestment and demerger of subsidiaries and operations   \u2212 (146) Transfers and other movements (18) (102) At the end of the financial year 769 674 Comprising: Current 384 356 Non-current 385 318 1  Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019 for more information. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherProvisionsContingentLiabilitiesAndContingentAssetsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-636": {
   "value": "21 <span class=\"_ _47\"> </span>Net debt<span class=\"_ _39c\"> </span>The Group seeks to maintain a strong balance sheet and deploys its capital with reference to the Capital <span class=\"_ _2\"></span>Allocation Framework.<span class=\"_ _39c\"> </span>The Group monitors capital using the net debt balance and the gearing ratio, being the ratio of net debt to net debt plus net assets.<span class=\"_ _39c\"> </span>The net debt definition includes the fair value of derivative financial instruments used to hedge cash and borrowings which reflects the Group\u2019s risk management strategy of reducing the volatility of net debt caused by fluctuations in foreign exchange and interest rates.<span class=\"_ _39c\"> </span>Under IFRS 16/AASB16 \u2018Leases\u2019, vessel lease contracts are required to be remeasured at each reporting date to the prevailing freight index. While these liabilities are included in the Group interest bearing liabilities, they are excluded from the net debt calculation as they do not align with how the Group assesses net debt for decision making in relation to the Capital <span class=\"_ _2\"></span>Allocation Framework. In addition, the freight index has historically been volatile which creates significant short-term fluctuation in these liabilities. US$M<span class=\"_ _39c\"> </span>2023<span class=\"_ _fa\"> </span><span class=\"ff76\">2022<span class=\"_ _39c\"> </span></span>Current<span class=\"_ _de\"> </span>Non-current<span class=\"_ _98\"> </span><span class=\"ff76\">Current<span class=\"_ _23\"> </span>Non-current<span class=\"_ _39c\"> </span></span>Interest bearing liabilities Bank loans <span class=\"_ _b2\"> </span><span class=\"ff75\">5,310<span class=\"_ _64\"> </span>2,192<span class=\"_ _6f\"> </span></span>397<span class=\"_ _64\"> </span>2,075<span class=\"_ _39c\"> </span>Notes and debentures <span class=\"_ _29a\"> </span><span class=\"ff75\">1,337<span class=\"_ _242\"> </span>10,482<span class=\"_ _140\"> </span></span>1,690<span class=\"_ _64\"> </span>9,673<span class=\"_ _39c\"> </span>Lease liabilities<span class=\"_ _2f9\"> </span><span class=\"ff75\">521<span class=\"_ _64\"> </span>2,498<span class=\"_ _6f\"> </span></span>519<span class=\"_ _64\"> </span>2,057<span class=\"_ _39c\"> </span>Bank overdraft and short-term borrowings<span class=\"_ _79\"> </span><span class=\"ff75\">5<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></span></span>Other<span class=\"_ _2fa\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _6d\"> </span></span>16<span class=\"_ _74\"> </span>1<span class=\"_ _39c\"> </span>T<span class=\"_ _2\"></span>otal interest bearing liabilities <span class=\"_ _2fb\"> </span>7,173<span class=\"_ _242\"> </span>15,172<span class=\"_ _140\"> </span><span class=\"ff76\">2,622<span class=\"_ _1c\"> </span>13,806<span class=\"_ _39c\"> </span></span>Less: Lease liability associated with index-linked freight contracts<span class=\"_ _2fc\"> </span><span class=\"ff75 ls49 ws4e\">11<span class=\"_ _0\"></span>4<span class=\"_ _eb\"> </span></span><span class=\"ff75\">173<span class=\"_ _eb\"> </span><span class=\"ff76 lsd3 ws102\">11<span class=\"_ _0\"></span>3<span class=\"_ _eb\"> </span></span><span class=\"ff76\">161<span class=\"_ _39c\"> </span></span></span>Less: Cash and cash equivalents Cash<span class=\"_ _2fd\"> </span><span class=\"ff75\">7,206<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _64\"> </span></span></span>5,728<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _39c\"> </span></span>Short-term deposits<span class=\"_ _2fe\"> </span><span class=\"ff75\">5,222<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _1a\"> </span></span></span>1<span class=\"_ _2\"></span>1,508<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _39c\"> </span></span>Less: T<span class=\"_ _2\"></span>otal cash and cash equivalents<span class=\"_ _249\"> </span>12,428<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _1c\"> </span><span class=\"ff76\">17,236<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _39c\"> </span></span></span></span>Less: Derivatives included in net debt Net debt management related instruments1<span class=\"_ _39c\"> </span>(1<span class=\"_ _2\"></span>13)<span class=\"_ _13\"> </span>(1,459)<span class=\"_ _e\"> </span><span class=\"ff76\">(358)<span class=\"_ _13\"> </span>(1,330)<span class=\"_ _39c\"> </span></span>Net cash management related instruments2<span class=\"_ _39c\"> </span>36<span class=\"_ _55\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _25\"> </span><span class=\"ff76\">273<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _39c\"> </span></span></span></span>Less: T<span class=\"_ _2\"></span>otal derivatives included in net debt <span class=\"_ _14c\"> </span>(77)<span class=\"_ _98\"> </span>(1,459)<span class=\"_ _b5\"> </span><span class=\"ff76\">(85)<span class=\"_ _98\"> </span>(1,330)<span class=\"_ _39c\"> </span></span>Net debt <span class=\"_ _165\"> </span>1<span class=\"_ _2\"></span>1,166<span class=\"_ _108\"> </span><span class=\"ff76\">333<span class=\"_ _39c\"> </span></span>Net assets<span class=\"_ _264\"> </span>48,530<span class=\"_ _33\"> </span><span class=\"ff76\">48,766<span class=\"_ _39c\"> </span></span>Gearing<span class=\"_ _167\"> </span>18.7%<span class=\"_ _28d\"> </span><span class=\"ff76\">0.7%<span class=\"_ _39c\"> </span></span>1 <span class=\"_ _42\"> </span>Represents the net cross currency and interest rate swaps designated as effective hedging instruments included within current and non-current other financial assets and liabilities.<span class=\"_ _39c\"> </span>2 <span class=\"_ _42\"> </span>Represents the net forward exchange contracts included within current and non-current other financial assets and liabilities.<span class=\"_ _39c\"> </span>Cash and short-term deposits are disclosed in the cash flow statement net of bank overdrafts and interest bearing liabilities at call.<span class=\"_ _39c\"> </span>2023 <span class=\"_ _2\"></span> US$M<span class=\"_ _39c\"> </span>2022 <span class=\"_ _2\"></span> US$M<span class=\"_ _39c\"> </span>2021 <span class=\"_ _2\"></span> US$M<span class=\"_ _39c\"> </span>T<span class=\"_ _2a\"></span>otal cash and cash equivalents <span class=\"_ _2ff\"> </span><span class=\"ff75\">12,428<span class=\"_ _242\"> </span></span>17,236<span class=\"_ _1c\"> </span>15,246<span class=\"_ _39c\"> </span>Bank overdrafts and short-term borrowings<span class=\"_ _29c\"> </span><span class=\"ff75\">(5)<span class=\"_ _b0\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _55\"> </span> \u2212<span class=\"_ _39c\"> </span></span></span>T<span class=\"_ _2\"></span>otal cash and cash equivalents, net of overdrafts<span class=\"_ _300\"> </span>12,423<span class=\"_ _242\"> </span><span class=\"ff76\">17,236<span class=\"_ _1c\"> </span>15,246<span class=\"_ _39c\"> </span></span>Cash and cash equivalents includes US$95 million (2022: US$127 million) restricted by legal or contractual arrangements.<span class=\"_ _39c\"> </span>Recognition and measurement<span class=\"_ _39c\"> </span>Cash and short-term deposits in the balance sheet comprise cash at bank and on hand and highly liquid cash deposits with short-term maturities that are readily convertible to known amounts of cash with insignificant risk of change in value. The Group considers that the carrying value of cash and cash equivalents approximate fair value due to their short-term to maturity<span class=\"_ _2\"></span>. Refer to note 22 \u2018Leases\u2019<span class=\"_ _2\"></span> and note 24 \u2018Financial risk management\u2019<span class=\"_ _2\"></span> for the recognition and measurement principles for lease liabilities and other financial liabilities.<span class=\"_ _39c\"> </span>Interest bearing liabilities and cash and cash equivalents include balances denominated in the following currencies:<span class=\"_ _39c\"> </span>Interest bearing liabilities<span class=\"_ _156\"> </span>Cash and cash equivalents<span class=\"_ _39c\"> </span>2023 <span class=\"_ _2\"></span> US$M<span class=\"_ _39c\"> </span>2022 <span class=\"_ _2\"></span> US$M<span class=\"_ _39c\"> </span>2023 <span class=\"_ _2\"></span> US$M<span class=\"_ _39c\"> </span>2022 <span class=\"_ _2\"></span> US$M<span class=\"_ _39c\"> </span>USD<span class=\"_ _289\"> </span><span class=\"ff75\">16,289<span class=\"_ _64\"> </span></span>8,813<span class=\"_ _140\"> </span><span class=\"ff75\">5,925<span class=\"_ _64\"> </span></span>7,654<span class=\"_ _39c\"> </span>EUR<span class=\"_ _26c\"> </span><span class=\"ff75\">3,050<span class=\"_ _64\"> </span></span>3,463<span class=\"_ _25\"> </span><span class=\"ff75\">544<span class=\"_ _140\"> </span></span>2,656<span class=\"_ _39c\"> </span>GBP<span class=\"_ _26c\"> </span><span class=\"ff75\">1,587<span class=\"_ _64\"> </span></span>2,621<span class=\"_ _25\"> </span><span class=\"ff75\">674<span class=\"_ _6d\"> </span></span>30<span class=\"_ _39c\"> </span>AUD<span class=\"_ _26c\"> </span><span class=\"ff75\">1,233<span class=\"_ _25\"> </span></span>783<span class=\"_ _64\"> </span><span class=\"ff75\">1,797<span class=\"_ _140\"> </span></span>3,360<span class=\"_ _39c\"> </span>CAD<span class=\"_ _301\"> </span><span class=\"ff75\">7<span class=\"_ _25\"> </span></span>584<span class=\"_ _140\"> </span><span class=\"ff75\">3,362<span class=\"_ _64\"> </span></span>3,437<span class=\"_ _39c\"> </span>Other<span class=\"_ _269\"> </span><span class=\"ff75\">179<span class=\"_ _25\"> </span></span>164<span class=\"_ _6f\"> </span><span class=\"ff75\">126<span class=\"_ _a\"> </span></span>99<span class=\"_ _39c\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _302\"> </span>22,345<span class=\"_ _242\"> </span><span class=\"ff76\">16,428<span class=\"_ _1c\"> </span></span>12,428<span class=\"_ _1c\"> </span><span class=\"ff76\">17,236<span class=\"_ _39c\"> </span></span>The Group enters into derivative transactions to convert the majority of its exposures above into US dollars. Further information on the Group\u2019s risk management activities relating to these balances is provided in note 24 \u2018Financial risk management\u2019.<span class=\"_ _39c\"> </span>Liquidity risk The Group\u2019s liquidity risk arises from the possibility that it may not be able to settle or meet its obligations as they fall due and is managed as part of the portfolio risk management strategy<span class=\"_ _2\"></span>. Operational, capital and regulatory requirements are considered in the management of liquidity risk, in conjunction with short-term and long-term forecast information. Recognising the cyclical volatility of operating cash flows, the Group has defined minimum target cash and liquidity buffers to be maintained to mitigate liquidity risk and support operations through the cycle.<span class=\"_ _39c\"> </span>The Group\u2019s strong credit profile, diversified funding sources, its minimum cash buffer and its committed credit facilities ensure that sufficient liquid funds are maintained to meet its daily cash requirements. The Group\u2019s Moody\u2019<span class=\"_ _2\"></span>s credit rating changed from <span class=\"_ _2\"></span>A2/P-1 to <span class=\"_ _2\"></span>A1/P-1 outlook stable (long-term/short-term). The Group\u2019s Standard &amp; Poor\u2019s rating has remained at <span class=\"_ _2\"></span>A-/A-1 outlook stable (long-term/short-term).<span class=\"_ _39c\"> </span>There were no defaults on the Group\u2019s liabilities during the period.<span class=\"_ _39c\"> </span>Counterparty risk<span class=\"_ _39c\"> </span>The Group is exposed to credit risk from its financing activities, including short-term cash investments such as deposits with banks and derivative contracts. This risk is managed by Group <span class=\"_ _2\"></span>Treasury in line with the counterparty risk framework, which aims to minimise the exposure to a counterparty and mitigate the risk of financial loss through counterparty failure.<span class=\"_ _39c\"> </span>Exposure to counterparties is monitored at a Group level across all products and includes exposure with derivatives and cash investments.<span class=\"_ _39c\"> </span>Investments and derivatives are only transacted with approved counterparties who have been assigned specific limits based on a quantitative credit risk model. These limits are updated at least bi-annually<span class=\"_ _2a\"></span>. <span class=\"_ _2\"></span>Additionally<span class=\"_ _2\"></span>, derivatives are subject to tenor limits and investments are subject to concentration limits by rating.<span class=\"_ _39c\"> </span>Derivative fair values are inclusive of valuation adjustments that take into account both the counterparty and the Group\u2019s risk of default.<span class=\"_ _39c\"> </span>Standby arrangements and unused credit facilities<span class=\"_ _39c\"> </span>The Group\u2019s committed revolving credit facility operates as a back-stop to the Group\u2019<span class=\"_ _2\"></span>s uncommitted commercial paper program. The combined amount drawn under the facility or as commercial paper will not exceed US$5.5 billion. <span class=\"_ _2\"></span>As at 30 June 2023, US$ nil commercial paper was drawn (2022:  US$ nil). The facility is due to mature on 10 October 2026. <span class=\"_ _2\"></span>A<span class=\"_ _2\"></span> commitment fee is payable on the undrawn balance and interest is payable on any drawn balance comprising a reference rate plus a margin. The agreed margins are typical for a credit facility extended to a company with the Group\u2019s credit rating.<span class=\"_ _39c\"> </span>Maturity profile of financial liabilities The maturity profile of the Group\u2019s financial liabilities based on the undiscounted contractual amounts, taking into account the derivatives related to debt, is as follows: 2023  US$M Bank loans, debentures and other loans<span class=\"_ _39c\"> </span>Expected future interest payments<span class=\"_ _39c\"> </span>Derivatives related to debentures<span class=\"_ _39c\"> </span>Other derivatives<span class=\"_ _39c\"> </span>Obligations under lease liabilities<span class=\"_ _39c\"> </span>T<span class=\"_ _2\"></span>rade <span class=\"_ _2\"></span> and other payables<span class=\"_ _39c\"> </span>1<span class=\"_ _39c\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _39c\"> </span>Due for payment:<span class=\"_ _39c\"> </span>In one year or less or on demand<span class=\"_ _21c\"> </span><span class=\"ff75\">6,659<span class=\"_ _6f\"> </span>757<span class=\"_ _140\"> </span>536<span class=\"_ _64\"> </span>257<span class=\"_ _140\"> </span>658<span class=\"_ _21\"> </span>6,175<span class=\"_ _156\"> </span>15,042<span class=\"_ _39c\"> </span></span>In more than one year but not more than two years<span class=\"_ _29\"> </span><span class=\"ff75\">1,399<span class=\"_ _25\"> </span>595<span class=\"_ _64\"> </span>388<span class=\"_ _140\"> </span>126<span class=\"_ _140\"> </span>538<span class=\"_ _1a3\"> </span>4<span class=\"_ _93\"> </span>3,050<span class=\"_ _39c\"> </span></span>In more than two years but not more than five years<span class=\"_ _202\"> </span><span class=\"ff75\">4,058<span class=\"_ _64\"> </span>1,410<span class=\"_ _140\"> </span>399<span class=\"_ _140\"> </span>267<span class=\"_ _37\"> </span>1,031<span class=\"_ _6f\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _93\"> </span></span>7,165<span class=\"_ _39c\"> </span></span>In more than five years<span class=\"_ _2c0\"> </span><span class=\"ff75\">8,093<span class=\"_ _140\"> </span>3,693<span class=\"_ _21\"> </span>1,020<span class=\"_ _8f\"> </span><span class=\"ls49 ws4e\">2<span class=\"_ _0\"></span>11<span class=\"_ _24f\"> </span></span>1,846<span class=\"_ _25\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _3\"> </span></span>14,863<span class=\"_ _39c\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _134\"> </span>20,209<span class=\"_ _140\"> </span>6,455<span class=\"_ _21\"> </span>2,343<span class=\"_ _64\"> </span>861<span class=\"_ _21\"> </span>4,073<span class=\"_ _21\"> </span>6,179<span class=\"_ _156\"> </span>40,120<span class=\"_ _39c\"> </span>Carrying amount<span class=\"_ _6c\"> </span>19,326<span class=\"_ _c5\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _21\"> </span></span>1,755<span class=\"_ _140\"> </span>804<span class=\"_ _21\"> </span>3,019<span class=\"_ _37\"> </span>6,179<span class=\"_ _3\"> </span>31,083<span class=\"_ _39c\"> </span>2022  US$M<span class=\"_ _39c\"> </span>Bank loans, debentures and other loans<span class=\"_ _39c\"> </span>Expected future interest payments<span class=\"_ _39c\"> </span>Derivatives related to debentures<span class=\"_ _39c\"> </span>Other derivatives<span class=\"_ _39c\"> </span>Obligations under lease liabilities<span class=\"_ _39c\"> </span>Trade <span class=\"_ _2a\"></span> and other payables1<span class=\"_ _39c\"> </span>T<span class=\"_ _2a\"></span>otal<span class=\"_ _39c\"> </span>Due for payment:<span class=\"_ _39c\"> </span>In one year or less or on demand<span class=\"_ _21c\"> </span>2,109<span class=\"_ _6f\"> </span>492<span class=\"_ _140\"> </span>525<span class=\"_ _64\"> </span>221<span class=\"_ _e\"> </span>579<span class=\"_ _21\"> </span>6,608<span class=\"_ _156\"> </span>10,534<span class=\"_ _39c\"> </span>In more than one year but not more than two years<span class=\"_ _29\"> </span>1,634<span class=\"_ _25\"> </span>427<span class=\"_ _64\"> </span>300<span class=\"_ _95\"> </span><span class=\"lsd3 ws102\">11<span class=\"_ _0\"></span>2<span class=\"_ _168\"> </span></span>443<span class=\"_ _6f\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _93\"> </span></span>2,916<span class=\"_ _39c\"> </span>In more than two years but not more than five years<span class=\"_ _202\"> </span><span class=\"ff76\">2,609<span class=\"_ _64\"> </span>1,032<span class=\"_ _140\"> </span>492<span class=\"_ _140\"> </span>246<span class=\"_ _95\"> </span>936<span class=\"_ _25\"> </span></span> \u2212<span class=\"_ _d5\"> </span><span class=\"ff76\">5,315<span class=\"_ _39c\"> </span></span>In more than five years<span class=\"_ _2c0\"> </span><span class=\"ff76\">7,550<span class=\"_ _140\"> </span>3,705<span class=\"_ _21\"> </span>1,467<span class=\"_ _64\"> </span>245<span class=\"_ _13\"> </span>1,470<span class=\"_ _6f\"> </span></span> \u2212<span class=\"_ _156\"> </span><span class=\"ff76\">14,437<span class=\"_ _39c\"> </span></span>T<span class=\"_ _2a\"></span>otal<span class=\"_ _2aa\"> </span>13,902<span class=\"_ _1ff\"> </span>5,656<span class=\"_ _21\"> </span>2,784<span class=\"_ _140\"> </span>824<span class=\"_ _13\"> </span>3,428<span class=\"_ _21\"> </span>6,608<span class=\"_ _156\"> </span>33,202<span class=\"_ _39c\"> </span>Carrying amount<span class=\"_ _1ed\"> </span>13,852<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _21\"> </span></span>1,824<span class=\"_ _140\"> </span>752<span class=\"_ _119\"> </span>2,576<span class=\"_ _21\"> </span>6,608<span class=\"_ _156\"> </span>25,612<span class=\"_ _39c\"> </span>1 <span class=\"_ _42\"> </span>Excludes input taxes of US$121 million (2022: US$79 million) included in other payables. Refer to note 9 \u2018Trade and other payables\u2019.<span class=\"_ _39c\"> </span>",
   "dimensions": {
    "concept": "bhp:DisclosureOfNetDebt",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-673": {
   "value": "US$M 2023 2022 Current Non-current Current Non-current Interest bearing liabilities Bank loans  5,310 2,192 397 2,075 Notes and debentures  1,337 10,482 1,690 9,673 Lease liabilities 521 2,498 519 2,057 Bank overdraft and short-term borrowings 5  \u2212  \u2212  \u2212 Other  \u2212  \u2212 16 1 Total interest bearing liabilities  7,173 15,172 2,622 13,806 Less: Lease liability associated with index-linked freight contracts 114 173 113 161 Less: Cash and cash equivalents Cash 7,206  \u2212 5,728  \u2212 Short-term deposits 5,222  \u2212 11,508  \u2212 Less: Total cash and cash equivalents 12,428  \u2212 17,236  \u2212 Less: Derivatives included in net debt Net debt management related instruments1 (113) (1,459) (358) (1,330) Net cash management related instruments2 36  \u2212 273  \u2212 Less: Total derivatives included in net debt  (77) (1,459) (85) (1,330) Net debt  11,166 333 Net assets 48,530 48,766 Gearing 18.7% 0.7% 1  Represents the net cross currency and interest rate swaps designated as effective hedging instruments included within current and non-current other financial assets and liabilities. 2  Represents the net forward exchange contracts included within current and non-current other financial assets and liabilities. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBorrowingsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-674": {
   "value": "Cash and short-term deposits are disclosed in the cash flow statement net of bank overdrafts and interest bearing liabilities at call. 2023  US$M 2022  US$M 2021  US$M Total cash and cash equivalents  12,428 17,236 15,246 Bank overdrafts and short-term borrowings (5)  \u2212  \u2212 Total cash and cash equivalents, net of overdrafts 12,423 17,236 15,246 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCashAndCashEquivalentsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-672": {
   "value": "Cash and cash equivalents includes US$95 million (2022: US$127 million) restricted by legal or contractual arrangements. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRestrictedCashAndCashEquivalentsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-745": {
   "value": "Recognition and measurement Cash and short-term deposits in the balance sheet comprise cash at bank and on hand and highly liquid cash deposits with short-term maturities that are readily convertible to known amounts of cash with insignificant risk of change in value. The Group considers that the carrying value of cash and cash equivalents approximate fair value due to their short-term to maturity. Refer to note 22 \u2018Leases\u2019 and note 24 \u2018Financial risk management\u2019 for the recognition and measurement principles for lease liabilities and other financial liabilities. ",
   "dimensions": {
    "concept": "bhp:DescriptionOfAccountingPolicyForNetDebt",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-766": {
   "value": "Cash and short-term deposits in the balance sheet comprise cash at bank and on hand and highly liquid cash deposits with short-term maturities that are readily convertible to known amounts of cash with insignificant risk of change in value. The Group considers that the carrying value of cash and cash equivalents approximate fair value due to their short-term to maturity. Refer to note 22 \u2018Leases\u2019 and note 24 \u2018Financial risk management\u2019 for the recognition and measurement principles for lease liabilities and other financial liabilities. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForRestrictedCashAndCashEquivalentsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-675": {
   "value": "Liquidity risk The Group\u2019s liquidity risk arises from the possibility that it may not be able to settle or meet its obligations as they fall due and is managed as part of the portfolio risk management strategy<span class=\"_ _2\"></span>. Operational, capital and regulatory requirements are considered in the management of liquidity risk, in conjunction with short-term and long-term forecast information. Recognising the cyclical volatility of operating cash flows, the Group has defined minimum target cash and liquidity buffers to be maintained to mitigate liquidity risk and support operations through the cycle.<span class=\"_ _39c\"> </span>The Group\u2019s strong credit profile, diversified funding sources, its minimum cash buffer and its committed credit facilities ensure that sufficient liquid funds are maintained to meet its daily cash requirements. The Group\u2019s Moody\u2019<span class=\"_ _2\"></span>s credit rating changed from <span class=\"_ _2\"></span>A2/P-1 to <span class=\"_ _2\"></span>A1/P-1 outlook stable (long-term/short-term). The Group\u2019s Standard &amp; Poor\u2019s rating has remained at <span class=\"_ _2\"></span>A-/A-1 outlook stable (long-term/short-term).<span class=\"_ _39c\"> </span>There were no defaults on the Group\u2019s liabilities during the period.<span class=\"_ _39c\"> </span>Counterparty risk<span class=\"_ _39c\"> </span>The Group is exposed to credit risk from its financing activities, including short-term cash investments such as deposits with banks and derivative contracts. This risk is managed by Group <span class=\"_ _2\"></span>Treasury in line with the counterparty risk framework, which aims to minimise the exposure to a counterparty and mitigate the risk of financial loss through counterparty failure.<span class=\"_ _39c\"> </span>Exposure to counterparties is monitored at a Group level across all products and includes exposure with derivatives and cash investments.<span class=\"_ _39c\"> </span>Investments and derivatives are only transacted with approved counterparties who have been assigned specific limits based on a quantitative credit risk model. These limits are updated at least bi-annually<span class=\"_ _2a\"></span>. <span class=\"_ _2\"></span>Additionally<span class=\"_ _2\"></span>, derivatives are subject to tenor limits and investments are subject to concentration limits by rating.<span class=\"_ _39c\"> </span>Derivative fair values are inclusive of valuation adjustments that take into account both the counterparty and the Group\u2019s risk of default.<span class=\"_ _39c\"> </span>Standby arrangements and unused credit facilities<span class=\"_ _39c\"> </span>The Group\u2019s committed revolving credit facility operates as a back-stop to the Group\u2019<span class=\"_ _2\"></span>s uncommitted commercial paper program. The combined amount drawn under the facility or as commercial paper will not exceed US$5.5 billion. <span class=\"_ _2\"></span>As at 30 June 2023, US$ nil commercial paper was drawn (2022:  US$ nil). The facility is due to mature on 10 October 2026. <span class=\"_ _2\"></span>A<span class=\"_ _2\"></span> commitment fee is payable on the undrawn balance and interest is payable on any drawn balance comprising a reference rate plus a margin. The agreed margins are typical for a credit facility extended to a company with the Group\u2019s credit rating.<span class=\"_ _39c\"> </span>Maturity profile of financial liabilities The maturity profile of the Group\u2019s financial liabilities based on the undiscounted contractual amounts, taking into account the derivatives related to debt, is as follows: 2023  US$M Bank loans, debentures and other loans<span class=\"_ _39c\"> </span>Expected future interest payments<span class=\"_ _39c\"> </span>Derivatives related to debentures<span class=\"_ _39c\"> </span>Other derivatives<span class=\"_ _39c\"> </span>Obligations under lease liabilities<span class=\"_ _39c\"> </span>T<span class=\"_ _2\"></span>rade <span class=\"_ _2\"></span> and other payables<span class=\"_ _39c\"> </span>1<span class=\"_ _39c\"> </span>T<span class=\"_ _2\"></span>otal<span class=\"_ _39c\"> </span>Due for payment:<span class=\"_ _39c\"> </span>In one year or less or on demand<span class=\"_ _21c\"> </span><span class=\"ff75\">6,659<span class=\"_ _6f\"> </span>757<span class=\"_ _140\"> </span>536<span class=\"_ _64\"> </span>257<span class=\"_ _140\"> </span>658<span class=\"_ _21\"> </span>6,175<span class=\"_ _156\"> </span>15,042<span class=\"_ _39c\"> </span></span>In more than one year but not more than two years<span class=\"_ _29\"> </span><span class=\"ff75\">1,399<span class=\"_ _25\"> </span>595<span class=\"_ _64\"> </span>388<span class=\"_ _140\"> </span>126<span class=\"_ _140\"> </span>538<span class=\"_ _1a3\"> </span>4<span class=\"_ _93\"> </span>3,050<span class=\"_ _39c\"> </span></span>In more than two years but not more than five years<span class=\"_ _202\"> </span><span class=\"ff75\">4,058<span class=\"_ _64\"> </span>1,410<span class=\"_ _140\"> </span>399<span class=\"_ _140\"> </span>267<span class=\"_ _37\"> </span>1,031<span class=\"_ _6f\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _93\"> </span></span>7,165<span class=\"_ _39c\"> </span></span>In more than five years<span class=\"_ _2c0\"> </span><span class=\"ff75\">8,093<span class=\"_ _140\"> </span>3,693<span class=\"_ _21\"> </span>1,020<span class=\"_ _8f\"> </span><span class=\"ls49 ws4e\">2<span class=\"_ _0\"></span>11<span class=\"_ _24f\"> </span></span>1,846<span class=\"_ _25\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _3\"> </span></span>14,863<span class=\"_ _39c\"> </span></span>T<span class=\"_ _2\"></span>otal<span class=\"_ _134\"> </span>20,209<span class=\"_ _140\"> </span>6,455<span class=\"_ _21\"> </span>2,343<span class=\"_ _64\"> </span>861<span class=\"_ _21\"> </span>4,073<span class=\"_ _21\"> </span>6,179<span class=\"_ _156\"> </span>40,120<span class=\"_ _39c\"> </span>Carrying amount<span class=\"_ _6c\"> </span>19,326<span class=\"_ _c5\"> </span><span class=\"ff78\"> \u2212<span class=\"_ _21\"> </span></span>1,755<span class=\"_ _140\"> </span>804<span class=\"_ _21\"> </span>3,019<span class=\"_ _37\"> </span>6,179<span class=\"_ _3\"> </span>31,083<span class=\"_ _39c\"> </span>2022  US$M<span class=\"_ _39c\"> </span>Bank loans, debentures and other loans<span class=\"_ _39c\"> </span>Expected future interest payments<span class=\"_ _39c\"> </span>Derivatives related to debentures<span class=\"_ _39c\"> </span>Other derivatives<span class=\"_ _39c\"> </span>Obligations under lease liabilities<span class=\"_ _39c\"> </span>Trade <span class=\"_ _2a\"></span> and other payables1<span class=\"_ _39c\"> </span>T<span class=\"_ _2a\"></span>otal<span class=\"_ _39c\"> </span>Due for payment:<span class=\"_ _39c\"> </span>In one year or less or on demand<span class=\"_ _21c\"> </span>2,109<span class=\"_ _6f\"> </span>492<span class=\"_ _140\"> </span>525<span class=\"_ _64\"> </span>221<span class=\"_ _e\"> </span>579<span class=\"_ _21\"> </span>6,608<span class=\"_ _156\"> </span>10,534<span class=\"_ _39c\"> </span>In more than one year but not more than two years<span class=\"_ _29\"> </span>1,634<span class=\"_ _25\"> </span>427<span class=\"_ _64\"> </span>300<span class=\"_ _95\"> </span><span class=\"lsd3 ws102\">11<span class=\"_ _0\"></span>2<span class=\"_ _168\"> </span></span>443<span class=\"_ _6f\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _93\"> </span></span>2,916<span class=\"_ _39c\"> </span>In more than two years but not more than five years<span class=\"_ _202\"> </span><span class=\"ff76\">2,609<span class=\"_ _64\"> </span>1,032<span class=\"_ _140\"> </span>492<span class=\"_ _140\"> </span>246<span class=\"_ _95\"> </span>936<span class=\"_ _25\"> </span></span> \u2212<span class=\"_ _d5\"> </span><span class=\"ff76\">5,315<span class=\"_ _39c\"> </span></span>In more than five years<span class=\"_ _2c0\"> </span><span class=\"ff76\">7,550<span class=\"_ _140\"> </span>3,705<span class=\"_ _21\"> </span>1,467<span class=\"_ _64\"> </span>245<span class=\"_ _13\"> </span>1,470<span class=\"_ _6f\"> </span></span> \u2212<span class=\"_ _156\"> </span><span class=\"ff76\">14,437<span class=\"_ _39c\"> </span></span>T<span class=\"_ _2a\"></span>otal<span class=\"_ _2aa\"> </span>13,902<span class=\"_ _1ff\"> </span>5,656<span class=\"_ _21\"> </span>2,784<span class=\"_ _140\"> </span>824<span class=\"_ _13\"> </span>3,428<span class=\"_ _21\"> </span>6,608<span class=\"_ _156\"> </span>33,202<span class=\"_ _39c\"> </span>Carrying amount<span class=\"_ _1ed\"> </span>13,852<span class=\"_ _55\"> </span><span class=\"ff77\"> \u2212<span class=\"_ _21\"> </span></span>1,824<span class=\"_ _140\"> </span>752<span class=\"_ _119\"> </span>2,576<span class=\"_ _21\"> </span>6,608<span class=\"_ _156\"> </span>25,612<span class=\"_ _39c\"> </span>1 <span class=\"_ _42\"> </span>Excludes input taxes of US$121 million (2022: US$79 million) included in other payables. Refer to note 9 \u2018Trade and other payables\u2019.<span class=\"_ _39c\"> </span><div class=\"t m0 h1f ff75 fs11 fc3 sc0 ls5 ws2 gsc30\">Liquidity risk<span class=\"_ _39c\"> </span></div><div class=\"t m0 h8 ff76 fs5 fc3 sc0 ls5 ws2 gsc31\">Refer to note 21 \u2018Net debt\u2019<span class=\"_ _2\"></span> for details on the Group\u2019s liquidity risk. </div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfLiquidityRiskExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-702": {
   "value": "Counterparty risk The Group is exposed to credit risk from its financing activities, including short-term cash investments such as deposits with banks and derivative contracts. This risk is managed by Group Treasury in line with the counterparty risk framework, which aims to minimise the exposure to a counterparty and mitigate the risk of financial loss through counterparty failure. Exposure to counterparties is monitored at a Group level across all products and includes exposure with derivatives and cash investments. Investments and derivatives are only transacted with approved counterparties who have been assigned specific limits based on a quantitative credit risk model. These limits are updated at least bi-annually. Additionally, derivatives are subject to tenor limits and investments are subject to concentration limits by rating. Derivative fair values are inclusive of valuation adjustments that take into account both the counterparty and the Group\u2019s risk of default. Standby arrangements and unused credit facilities The Group\u2019s committed revolving credit facility operates as a back-stop to the Group\u2019s uncommitted commercial paper program. The combined amount drawn under the facility or as commercial paper will not exceed US$5.5 billion. As at 30 June 2023, US$ nil commercial paper was drawn (2022:  US$ nil). The facility is due to mature on 10 October 2026. A commitment fee is payable on the undrawn balance and interest is payable on any drawn balance comprising a reference rate plus a margin. The agreed margins are typical for a credit facility extended to a company with the Group\u2019s credit rating. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfManagingLiquidityRisk",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-703": {
   "value": "Maturity profile of financial liabilities The maturity profile of the Group\u2019s financial liabilities based on the undiscounted contractual amounts, taking into account the derivatives related to debt, is as follows: 2023  US$M Bank loans, debentures and other loans Expected future interest payments Derivatives related to debentures Other derivatives Obligations under lease liabilities Trade  and other payables 1 Total Due for payment: In one year or less or on demand 6,659 757 536 257 658 6,175 15,042 In more than one year but not more than two years 1,399 595 388 126 538 4 3,050 In more than two years but not more than five years 4,058 1,410 399 267 1,031  \u2212 7,165 In more than five years 8,093 3,693 1,020 211 1,846  \u2212 14,863 Total 20,209 6,455 2,343 861 4,073 6,179 40,120 Carrying amount 19,326  \u2212 1,755 804 3,019 6,179 31,083 2022  US$M Bank loans, debentures and other loans Expected future interest payments Derivatives related to debentures Other derivatives Obligations under lease liabilities Trade  and other payables1 Total Due for payment: In one year or less or on demand 2,109 492 525 221 579 6,608 10,534 In more than one year but not more than two years 1,634 427 300 112 443  \u2212 2,916 In more than two years but not more than five years 2,609 1,032 492 246 936  \u2212 5,315 In more than five years 7,550 3,705 1,467 245 1,470  \u2212 14,437 Total 13,902 5,656 2,784 824 3,428 6,608 33,202 Carrying amount 13,852  \u2212 1,824 752 2,576 6,608 25,612 1  Excludes input taxes of US$121 million (2022: US$79 million) included in other payables. Refer to note 9 \u2018Trade and other payables\u2019. ",
   "dimensions": {
    "concept": "ifrs-full:MaturityAnalysisForDerivativeFinancialLiabilities",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-746": {
   "value": "Maturity profile of financial liabilities The maturity profile of the Group\u2019s financial liabilities based on the undiscounted contractual amounts, taking into account the derivatives related to debt, is as follows: 2023  US$M Bank loans, debentures and other loans Expected future interest payments Derivatives related to debentures Other derivatives Obligations under lease liabilities Trade  and other payables 1 Total Due for payment: In one year or less or on demand 6,659 757 536 257 658 6,175 15,042 In more than one year but not more than two years 1,399 595 388 126 538 4 3,050 In more than two years but not more than five years 4,058 1,410 399 267 1,031  \u2212 7,165 In more than five years 8,093 3,693 1,020 211 1,846  \u2212 14,863 Total 20,209 6,455 2,343 861 4,073 6,179 40,120 Carrying amount 19,326  \u2212 1,755 804 3,019 6,179 31,083 2022  US$M Bank loans, debentures and other loans Expected future interest payments Derivatives related to debentures Other derivatives Obligations under lease liabilities Trade  and other payables1 Total Due for payment: In one year or less or on demand 2,109 492 525 221 579 6,608 10,534 In more than one year but not more than two years 1,634 427 300 112 443  \u2212 2,916 In more than two years but not more than five years 2,609 1,032 492 246 936  \u2212 5,315 In more than five years 7,550 3,705 1,467 245 1,470  \u2212 14,437 Total 13,902 5,656 2,784 824 3,428 6,608 33,202 Carrying amount 13,852  \u2212 1,824 752 2,576 6,608 25,612 1  Excludes input taxes of US$121 million (2022: US$79 million) included in other payables. Refer to note 9 \u2018Trade and other payables\u2019. ",
   "dimensions": {
    "concept": "ifrs-full:MaturityAnalysisForNonderivativeFinancialLiabilities",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-637": {
   "value": "22 Leases Movements in the Group\u2019s lease liabilities during the year are as follows: 2023  US$M 2022  US$M At the beginning of the financial year 2,576 3,896 Additions 542 866 Acquisition of subsidiaries and operations 1 423 \u2212 Remeasurements of index-linked freight contracts 53 (369) Lease payments2 (706) (1,288) Foreign exchange movement 12 (126) Amortisation of discounting 130 125 Divestment and demerger of subsidiaries and operations3   \u2212 (492) Transfers and other movements (11) (36) At the end of the financial year 3,019 2,576 Comprising: Current liabilities 521 519 Non-current liabilities 2,498 2,057 1  Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019 for more information. 2  Includes US$ nil (2022: US$39 million) related to Discontinued operations. 3  Relates to the divestment of BMC and merger of Petroleum with Woodside in FY2022. Refer to notes 3 \u2018Exceptional items\u2019 and 28 \u2018Discontinued operations\u2019 for more information. A significant proportion by value of the Group\u2019s lease contracts relate to plant facilities, office buildings and vessels. Lease terms for plant facilities and office buildings typically run for over 10 years and vessels from four to 10 years. Other leases include port facilities, various equipment and vehicles. The lease contracts contain a wide range of different terms and conditions including extension and termination options and variable lease payments. The Group\u2019s lease obligations are included in the Group\u2019s Interest bearing liabilities and, with the exception of vessel lease contracts that are priced with reference to a freight index, form part of the Group\u2019s net debt. The maturity profile of lease liabilities based on the undiscounted contractual amounts is as follows: Lease liability 2023  US$M 2022  US$M Due for payment: In one year or less or on demand 658 579 In more than one year but not more than two years 538 443 In more than two years but not more than five years 1,031 936 In more than five years 1 1,846 1,470 Total 4,073 3,428 Carrying amount 3,019 2,576 1  Includes US$808 million (2022: US$707 million) due for payment in more than ten years. At 30 June 2023, commitments for leases not yet commenced based on undiscounted contractual amounts were US$1,271 million (2022: US$928 million). Movements in the Group\u2019s right-of-use assets during the year are as follows: 2023 2022 Land and buildings US$M Plant and equipment US$M Total  US$M Land and buildings  US$M Plant and equipment US$M Total  US$M Net book value At the beginning of the financial year 452 1,909 2,361 638 2,712 3,350 Additions  192 350 542 41 825 866 Acquisition of subsidiaries and operations 1 \u2212 423 423 \u2212 \u2212 \u2212 Remeasurements of index-linked freight contracts  \u2212 53 53  \u2212 (369) (369) Depreciation expensed during the period  (71) (462) (533) (103) (872) (975) Depreciation classified as exploration  \u2212  \u2212  \u2212  \u2212 (3) (3) Impairments for the year  \u2212  \u2212  \u2212 (7)  \u2212 (7) Divestment and demerger of subsidiaries and operations2 \u2212  \u2212  \u2212 (116) (313) (429) Transfers and other movements  \u2212 (37) (37) (1) (71) (72) At the end of the financial year 573 2,236 2,809 452 1,909 2,361 \u2013 Cost 758 4,088 4,846 745 4,307 5,052 \u2013 Accumulated depreciation and impairments (185) (1,852) (2,037) (293) (2,398) (2,691) 1  Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019 for more information. 2  Relates to the divestment of BMC and merger of Petroleum with Woodside in FY2022. Refer to notes 3 \u2018Exceptional items\u2019 and 28 \u2018Discontinued operations\u2019 for more information. Right-of-use assets are included within the underlying asset classes in Property, plant and equipment. Refer to note 11 \u2018Property, plant and equipment\u2019. Amounts recorded in the income statement and the cash flow statement for the year were: 2023  US$M 2022  US$M 2021  US$M Included within Income statement Depreciation of right-of-use assets 533 964 753 Profit from operations Short-term, low-value and variable lease costs1 795 847 834 Profit from operations Interest on lease liabilities  130 119 102 Financial expenses Cash flow statement Principal lease payments  576 1,130 732 Cash flows from financing activities Lease interest payments  130 119 102 Cash flows from operating activities 1  Relates to US$714 million of variable lease costs (2022: US$585 million; 2021: US$510 million), US$47 million of short-term lease costs (2022: US$222 million; 2021: US$294 million) and US$34 million of low-value lease costs (2022: US$40 million; 2021: US$30 million). Variable lease costs include contracts for hire of mining service equipment, drill rigs and transportation services. These contracts contain variable lease payments based on usage and asset performance. Recognition and measurement All leases with the exception of short-term (under 12 months) and low-value leases are recognised on the balance sheet, as a right-of-use asset and a corresponding interest bearing liability. Lease liabilities are initially measured at the present value of the future lease payments from the lease commencement date and are subsequently adjusted to reflect the interest on lease liabilities, lease payments and any remeasurements due to, for example, lease modifications or a change to future lease payments linked to an index or rate. Lease payments are discounted using the interest rate implicit in the lease or, where the rate is not readily determinable, the interest payments are discounted at the Group\u2019s weighted average incremental borrowing rate, adjusted to reflect factors specific to the lease, including where relevant the currency, tenor and location of the lease. In addition to containing a lease, the Group\u2019s contractual arrangements may include non-lease components. For example, certain mining services arrangements involve the provision of additional services, including maintenance, drilling activities and the supply of personnel. The Group has elected to separate these non-lease components from the lease components in measuring lease liabilities. Non-lease components are accounted for in accordance with the accounting policies applied to each underlying good or service received. Low-value and short-term leases continue to be expensed to the income statement. Variable lease payments not dependent on an index or rate are excluded from lease liabilities, and expensed to the income statement. Right-of-use assets are measured at cost, less any accumulated depreciation and impairment losses, and adjusted for any remeasurement of lease liabilities. The cost will initially correspond to the lease liability, adjusted for initial direct costs, lease payments made prior to lease commencement, capitalised provisions for closure and rehabilitation and any lease incentives received. The lease asset and liability associated with all index-linked freight contracts, including continuous voyage charters (CVCs), are measured at each reporting date based on the prevailing freight index (generally the Baltic C5 index). Lease costs are recognised in the income statement over the lease term in the form of depreciation on the right-of-use asset and the unwinding of finance charges on the lease liability. Where the Group is the operator of an unincorporated joint operation and all investors are parties to a lease, the Group recognises its proportionate share of the lease liability and associated right-of-use asset. In the event the Group is the sole signatory to a lease, and therefore has the sole legal obligation to make lease payments, the lease liability is recognised in full. Where the associated right-of-use asset is sub-leased (under a finance sub-lease) to a joint operation, for instance where it is dedicated to a single operation and the joint operation has the right to direct the use of the asset, the Group (as lessor) recognises its proportionate share of the right-of-use asset and a net investment in the lease, representing amounts to be recovered from the other parties to the joint operation. If the Group is not party to the head lease contract but sub-leases the associated right-of-use asset (as lessee), it recognises its proportionate share of the right-of-use asset and a lease liability which is payable to the operator. Key judgements and estimates Judgements: Certain contractual arrangements not in the form of a lease require the Group to apply significant judgement in evaluating whether the Group controls the right to direct the use of assets and therefore whether the contract contains a lease. Management considers all facts and circumstances in determining whether the Group or the supplier has the rights to direct how, and for what purpose, the underlying assets are used in certain mining contracts and other arrangements, including outsourcing and shipping arrangements. Judgement is used to assess which decision-making rights mostly affect the benefits of use of the assets for each arrangement. Where a contract includes the provision of non-lease services, judgement is required to identify the lease and non-lease components. Estimates: Where the Group cannot readily determine the interest rate implicit in the lease, estimation is involved in the determination of the weighted average incremental borrowing rate to measure lease liabilities. The incremental borrowing rate reflects the rates of interest a lessee would have to pay to borrow over a similar term, with similar security, the funds necessary to obtain an asset of similar value to the right-of-use asset in a similar economic environment. Under the Group\u2019s portfolio approach to debt management, the Group does not specifically borrow for asset purchases. Therefore, the incremental borrowing rate is estimated referencing the Group\u2019s corporate borrowing portfolio and other similar rated entities, adjusted to reflect the terms and conditions of the lease (including the impact of currency, credit rating of subsidiary entering into the lease and the term of the lease), at the inception of the lease arrangement or the time of lease modification. The Group estimates stand-alone prices, where such prices are not readily observable, in order to allocate the contractual payments between lease and non-lease components. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfLeasesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-676": {
   "value": "The maturity profile of lease liabilities based on the undiscounted contractual amounts is as follows: Lease liability 2023  US$M 2022  US$M Due for payment: In one year or less or on demand 658 579 In more than one year but not more than two years 538 443 In more than two years but not more than five years 1,031 936 In more than five years 1 1,846 1,470 Total 4,073 3,428 Carrying amount 3,019 2,576 1  Includes US$808 million (2022: US$707 million) due for payment in more than ten years. ",
   "dimensions": {
    "concept": "bhp:DisclosureOfMaturityAnalysisOfLeasePayments",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-677": {
   "value": "Movements in the Group\u2019s right-of-use assets during the year are as follows: 2023 2022 Land and buildings US$M Plant and equipment US$M Total  US$M Land and buildings  US$M Plant and equipment US$M Total  US$M Net book value At the beginning of the financial year 452 1,909 2,361 638 2,712 3,350 Additions  192 350 542 41 825 866 Acquisition of subsidiaries and operations 1 \u2212 423 423 \u2212 \u2212 \u2212 Remeasurements of index-linked freight contracts  \u2212 53 53  \u2212 (369) (369) Depreciation expensed during the period  (71) (462) (533) (103) (872) (975) Depreciation classified as exploration  \u2212  \u2212  \u2212  \u2212 (3) (3) Impairments for the year  \u2212  \u2212  \u2212 (7)  \u2212 (7) Divestment and demerger of subsidiaries and operations2 \u2212  \u2212  \u2212 (116) (313) (429) Transfers and other movements  \u2212 (37) (37) (1) (71) (72) At the end of the financial year 573 2,236 2,809 452 1,909 2,361 \u2013 Cost 758 4,088 4,846 745 4,307 5,052 \u2013 Accumulated depreciation and impairments (185) (1,852) (2,037) (293) (2,398) (2,691) 1  Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019 for more information. 2  Relates to the divestment of BMC and merger of Petroleum with Woodside in FY2022. Refer to notes 3 \u2018Exceptional items\u2019 and 28 \u2018Discontinued operations\u2019 for more information. Right-of-use assets are included within the underlying asset classes in Property, plant and equipment. Refer to note 11 \u2018Property, plant and equipment\u2019. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfQuantitativeInformationAboutRightofuseAssetsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-747": {
   "value": "Recognition and measurement All leases with the exception of short-term (under 12 months) and low-value leases are recognised on the balance sheet, as a right-of-use asset and a corresponding interest bearing liability. Lease liabilities are initially measured at the present value of the future lease payments from the lease commencement date and are subsequently adjusted to reflect the interest on lease liabilities, lease payments and any remeasurements due to, for example, lease modifications or a change to future lease payments linked to an index or rate. Lease payments are discounted using the interest rate implicit in the lease or, where the rate is not readily determinable, the interest payments are discounted at the Group\u2019s weighted average incremental borrowing rate, adjusted to reflect factors specific to the lease, including where relevant the currency, tenor and location of the lease. In addition to containing a lease, the Group\u2019s contractual arrangements may include non-lease components. For example, certain mining services arrangements involve the provision of additional services, including maintenance, drilling activities and the supply of personnel. The Group has elected to separate these non-lease components from the lease components in measuring lease liabilities. Non-lease components are accounted for in accordance with the accounting policies applied to each underlying good or service received. Low-value and short-term leases continue to be expensed to the income statement. Variable lease payments not dependent on an index or rate are excluded from lease liabilities, and expensed to the income statement. Right-of-use assets are measured at cost, less any accumulated depreciation and impairment losses, and adjusted for any remeasurement of lease liabilities. The cost will initially correspond to the lease liability, adjusted for initial direct costs, lease payments made prior to lease commencement, capitalised provisions for closure and rehabilitation and any lease incentives received. The lease asset and liability associated with all index-linked freight contracts, including continuous voyage charters (CVCs), are measured at each reporting date based on the prevailing freight index (generally the Baltic C5 index). Lease costs are recognised in the income statement over the lease term in the form of depreciation on the right-of-use asset and the unwinding of finance charges on the lease liability. Where the Group is the operator of an unincorporated joint operation and all investors are parties to a lease, the Group recognises its proportionate share of the lease liability and associated right-of-use asset. In the event the Group is the sole signatory to a lease, and therefore has the sole legal obligation to make lease payments, the lease liability is recognised in full. Where the associated right-of-use asset is sub-leased (under a finance sub-lease) to a joint operation, for instance where it is dedicated to a single operation and the joint operation has the right to direct the use of the asset, the Group (as lessor) recognises its proportionate share of the right-of-use asset and a net investment in the lease, representing amounts to be recovered from the other parties to the joint operation. If the Group is not party to the head lease contract but sub-leases the associated right-of-use asset (as lessee), it recognises its proportionate share of the right-of-use asset and a lease liability which is payable to the operator. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForLeasesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-713": {
   "value": "23  Net finance costs 2023  US$M 2022  US$M 2021  US$M Financial expenses Interest expense using the effective interest rate method: Interest on bank loans, overdrafts and all other borrowings  997 491 607 Interest capitalised at 5.71% (2022: 2.90%; 2021: 2.83%)1 (271) (113) (204) Interest on lease liabilities 130 119 102 Discounting on provisions and other liabilities 1,293 645 353 Other gains and losses: Fair value change on hedged loans (803) (1,286) (779) Fair value change on hedging derivatives 691 1,277 704 Loss on bond repurchase 2 \u2212  \u2212 395 Exchange variations on net debt  9 (99) 99 Other 14 16 13 Total financial expenses 2,060 1,050 1,290 Financial income Interest income  (529) (81) (67) Net finance costs 1,531 969 1,223 1  Interest has been capitalised at the rate of interest applicable to the specific borrowings financing the assets under construction or, where financed through general borrowings, at a capitalisation rate representing the average interest rate on such borrowings. Tax relief for capitalised interest is approximately US$81 million (2022: US$34 million; 2021: US$61 million). 2  Relates to the additional cost on settlement of two multi-currency hybrid debt repurchase programs and the unwind of the associated hedges, included in a total cash payment of US$3,402 million disclosed in repayment of interest bearing liabilities in the Consolidated Cash Flow Statement. Recognition and measurement Interest income is accrued using the effective interest rate method. Finance costs are expensed as incurred, except where they relate to the financing of construction or development of qualifying assets. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInterestIncomeExpenseExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-704": {
   "value": "23  Net finance costs 2023  US$M 2022  US$M 2021  US$M Financial expenses Interest expense using the effective interest rate method: Interest on bank loans, overdrafts and all other borrowings  997 491 607 Interest capitalised at 5.71% (2022: 2.90%; 2021: 2.83%)1 (271) (113) (204) Interest on lease liabilities 130 119 102 Discounting on provisions and other liabilities 1,293 645 353 Other gains and losses: Fair value change on hedged loans (803) (1,286) (779) Fair value change on hedging derivatives 691 1,277 704 Loss on bond repurchase 2 \u2212  \u2212 395 Exchange variations on net debt  9 (99) 99 Other 14 16 13 Total financial expenses 2,060 1,050 1,290 Financial income Interest income  (529) (81) (67) Net finance costs 1,531 969 1,223 1  Interest has been capitalised at the rate of interest applicable to the specific borrowings financing the assets under construction or, where financed through general borrowings, at a capitalisation rate representing the average interest rate on such borrowings. Tax relief for capitalised interest is approximately US$81 million (2022: US$34 million; 2021: US$61 million). 2  Relates to the additional cost on settlement of two multi-currency hybrid debt repurchase programs and the unwind of the associated hedges, included in a total cash payment of US$3,402 million disclosed in repayment of interest bearing liabilities in the Consolidated Cash Flow Statement. Recognition and measurement Interest income is accrued using the effective interest rate method. Finance costs are expensed as incurred, except where they relate to the financing of construction or development of qualifying assets. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinanceCostExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-678": {
   "value": "23  Net finance costs 2023  US$M 2022  US$M 2021  US$M Financial expenses Interest expense using the effective interest rate method: Interest on bank loans, overdrafts and all other borrowings  997 491 607 Interest capitalised at 5.71% (2022: 2.90%; 2021: 2.83%)1 (271) (113) (204) Interest on lease liabilities 130 119 102 Discounting on provisions and other liabilities 1,293 645 353 Other gains and losses: Fair value change on hedged loans (803) (1,286) (779) Fair value change on hedging derivatives 691 1,277 704 Loss on bond repurchase 2 \u2212  \u2212 395 Exchange variations on net debt  9 (99) 99 Other 14 16 13 Total financial expenses 2,060 1,050 1,290 Financial income Interest income  (529) (81) (67) Net finance costs 1,531 969 1,223 1  Interest has been capitalised at the rate of interest applicable to the specific borrowings financing the assets under construction or, where financed through general borrowings, at a capitalisation rate representing the average interest rate on such borrowings. Tax relief for capitalised interest is approximately US$81 million (2022: US$34 million; 2021: US$61 million). 2  Relates to the additional cost on settlement of two multi-currency hybrid debt repurchase programs and the unwind of the associated hedges, included in a total cash payment of US$3,402 million disclosed in repayment of interest bearing liabilities in the Consolidated Cash Flow Statement. Recognition and measurement Interest income is accrued using the effective interest rate method. Finance costs are expensed as incurred, except where they relate to the financing of construction or development of qualifying assets. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinanceIncomeExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-638": {
   "value": "23  Net finance costs 2023  US$M 2022  US$M 2021  US$M Financial expenses Interest expense using the effective interest rate method: Interest on bank loans, overdrafts and all other borrowings  997 491 607 Interest capitalised at 5.71% (2022: 2.90%; 2021: 2.83%)1 (271) (113) (204) Interest on lease liabilities 130 119 102 Discounting on provisions and other liabilities 1,293 645 353 Other gains and losses: Fair value change on hedged loans (803) (1,286) (779) Fair value change on hedging derivatives 691 1,277 704 Loss on bond repurchase 2 \u2212  \u2212 395 Exchange variations on net debt  9 (99) 99 Other 14 16 13 Total financial expenses 2,060 1,050 1,290 Financial income Interest income  (529) (81) (67) Net finance costs 1,531 969 1,223 1  Interest has been capitalised at the rate of interest applicable to the specific borrowings financing the assets under construction or, where financed through general borrowings, at a capitalisation rate representing the average interest rate on such borrowings. Tax relief for capitalised interest is approximately US$81 million (2022: US$34 million; 2021: US$61 million). 2  Relates to the additional cost on settlement of two multi-currency hybrid debt repurchase programs and the unwind of the associated hedges, included in a total cash payment of US$3,402 million disclosed in repayment of interest bearing liabilities in the Consolidated Cash Flow Statement. Recognition and measurement Interest income is accrued using the effective interest rate method. Finance costs are expensed as incurred, except where they relate to the financing of construction or development of qualifying assets. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinanceIncomeExpenseExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-773": {
   "value": "Recognition and measurement Interest income is accrued using the effective interest rate method. Finance costs are expensed as incurred, except where they relate to the financing of construction or development of qualifying assets. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForInterestIncomeAndExpenseExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-767": {
   "value": "Recognition and measurement Interest income is accrued using the effective interest rate method. Finance costs are expensed as incurred, except where they relate to the financing of construction or development of qualifying assets. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinanceCostsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-748": {
   "value": "Recognition and measurement Interest income is accrued using the effective interest rate method. Finance costs are expensed as incurred, except where they relate to the financing of construction or development of qualifying assets. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinanceIncomeAndCostsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-639": {
   "value": "24  Financial risk management 24.1  Financial risks Financial and capital risk management strategy The financial risks arising from the Group\u2019s operations comprise market, liquidity and credit risk. These risks arise in the normal course of business and the Group manages its exposure to them in accordance with the Group\u2019s portfolio risk management strategy. The objective of the strategy is to support the delivery of the Group\u2019s financial targets, while protecting its future financial security and flexibility by taking advantage of the natural diversification provided by the scale, diversity and flexibility of the Group\u2019s operations and activities. As part of the risk management strategy, the Group monitors target gearing levels and credit rating metrics under a range of different stress test scenarios incorporating operational and macroeconomic factors. Market risk management The Group\u2019s activities expose it to market risks associated with movements in interest rates, foreign currencies and commodity prices. Under the strategy outlined above, the Group seeks to achieve financing costs, currency impacts, input costs and commodity prices on a floating or index basis. In executing the strategy, financial instruments are potentially employed in three distinct but related activities. The following table summarises these activities and the key risk management processes: Activity Key risk management processes 1 Risk mitigation On an exception basis, hedging for the purposes of mitigating risk related to specific and significant expenditure on investments or capital projects will be executed if necessary to support the Group\u2019s strategic objectives. Execution of transactions within approved mandates. 2 Economic hedging of commodity sales, operating costs, short-term cash deposits, other monetary items and debt instruments Where Group commodity production is sold to customers on pricing terms that deviate from the relevant index target and where a relevant derivatives market exists, financial instruments may be executed as an economic hedge to align the revenue price exposure with the index target and US dollars. Where debt is issued in a currency other than the US dollar and/or at a fixed interest rate, fair value and cash flow hedges may be executed to align the debt exposure with the Group\u2019s functional currency of US dollars and/or to swap to a floating interest rate. Where short-term cash deposits and other monetary items are denominated in a currency other than US dollars, derivative financial instruments may be executed to align the foreign exchange exposure to the Group\u2019s functional currency of US dollars. Measuring and reporting the exposure in customer commodity contracts and issued debt instruments. Executing hedging derivatives to align the total group exposure to the index target. Execution of transactions within approved mandates. 3 Strategic financial transactions Opportunistic transactions may be executed with financial instruments to capture value from perceived market over/under valuations. Execution of transactions within approved mandates. Primary responsibility for the identification and control of financial risks, including authorising and monitoring the use of financial instruments for the above activities and stipulating policy thereon, rests with the Financial Risk Management Committee under authority delegated by the Chief Executive Officer. Interest rate risk The Group is exposed to interest rate risk on its outstanding borrowings and short-term cash deposits from the possibility that changes in interest rates will affect future cash flows or the fair value of fixed interest rate financial instruments. Interest rate risk is managed as part of the portfolio risk management strategy. The majority of the Group\u2019s debt is issued at fixed interest rates. The Group has also drawn on a facility of US$5.0 billion to fund the acquisition of OZL that was referenced to floating rates. The Group has entered into interest rate swaps and cross currency interest rate swaps to convert most of its fixed interest rate exposure to floating US dollar interest rate exposure. As at 30 June 2023, 98 per cent of the Group\u2019s borrowings were exposed to floating interest rates inclusive of the effect of swaps (2022: 80 per cent). The fair value of interest rate swaps and cross currency interest rate swaps in hedge relationships used to hedge both interest rate and foreign currency risks are shown in the valuation hierarchy in section 24.4 \u2018Derivatives and hedge accounting\u2019. Based on the net debt position as at 30 June 2023, taking into account interest rate swaps and cross currency interest rate swaps, it is estimated that a one percentage point increase in the Secured Overnight Financing Rate (SOFR) interest rate will decrease the Group\u2019s equity and profit after taxation by US$58 million (2022: increase of US$29 million). This assumes the change in interest rates is effective from the beginning of the financial year and the fixed/floating mix and balances are constant over the year. Interest Rate Benchmark Reform The London Interbank Offered Rate (LIBOR) and other benchmark interest rates are being replaced by alternative risk-free rates (ARR) as part of inter- bank offer rate (IBOR) reform. Sterling LIBOR ceased to be published on 1 January 2022 and USD LIBOR will no longer be published after 30 June 2023. Amendments to IFRS 9/AASB 9 \u2018Financial Instruments\u2019, IFRS 7/AASB 7 \u2018Financial Instruments: Disclosures\u2019 and IFRS 16/AASB 16 \u2018Leases\u2019 in relation to IBOR reform early adopted by the Group in previous periods impact the Group\u2019s cross currency and interest rate swaps, which prior to IBOR reform referenced the US LIBOR benchmark, and the associated hedge accounting. These amendments provide relief from applying certain hedge accounting requirements to hedging arrangements directly impacted by IBOR reform. In particular, where changes to the Group\u2019s instruments arise solely as a result of IBOR reform and do not change the economic substance of the Group\u2019s arrangements, the Group is able to maintain its existing hedge relationships and accounting. During the year ended 30 June 2023, the Group actively transitioned all impacted cross currency and interest rate swaps from US LIBOR to the alternative, widely adopted SOFR benchmark. As the transition resulted solely from IBOR reform, the Group has applied the relief available in IFRS 9 and continues to apply hedge accounting to its hedging arrangements, including accounting for ineffectiveness. Refer to section 24.4 \u2018Derivatives and hedge accounting\u2019 for further information. The Group does not hold any material lease arrangements that contain reference to the existing benchmarks and as a result there is no material impact on lease liabilities or right-of-use assets at 30 June 2023. The Group\u2019s revolving credit facility was restructured to reference to Alternative Reference Rates (ARRs) and remains undrawn. Furthermore, in the period, Escondida has executed new SOFR linked loans and has amended existing US LIBOR linked loans with lenders, so that the applicable floating interest rate reference 3M or 6M Term SOFR rates. Currency risk The US dollar is the predominant functional currency within the Group and as a result, currency exposures arise from transactions and balances in currencies other than the US dollar. The Group\u2019s potential currency exposures comprise: \u2013  translational exposure in respect of non-functional currency monetary items \u2013  transactional exposure in respect of non-functional currency expenditure and revenues The Group\u2019s foreign currency risk is managed as part of the portfolio risk management strategy. Translational exposure in respect of non-functional currency monetary items Monetary items, including financial assets and liabilities, denominated in currencies other than the functional currency of an operation are restated at the end of each reporting period to US dollar equivalents and the associated gain or loss is taken to the income statement. The exception is foreign exchange gains or losses on foreign currency denominated provisions for closure and rehabilitation at operating sites, which are capitalised in property, plant and equipment. The Group has entered into cross currency interest rate swaps and foreign exchange forwards to convert its significant foreign currency exposures in respect of monetary items into US dollars. Fluctuations in foreign exchange rates are therefore not expected to have a significant impact on equity and profit after tax. The following table shows the carrying values of financial assets and liabilities at the end of the reporting period denominated in currencies other than the US dollar that are exposed to foreign currency risk: Net financial (liabilities)/assets \u2013 by currency of denomination 2023  US$M 2022  US$M AUD (4,168) (3,649) CLP (74) (602) GBP 353 388 EUR 217 280 Other 43 187 Total (3,629) (3,396) The principal non-functional currencies to which the Group is exposed are the Australian dollar, the Chilean peso, the Pound sterling and the Euro. Based on the Group\u2019s net financial assets and liabilities as at 30 June 2023, a weakening of the US dollar against these currencies (one cent strengthening in Australian dollar, 10 pesos strengthening in Chilean peso, one penny strengthening in Pound sterling and one cent strengthening in Euro), with all other variables held constant, would decrease the Group\u2019s equity and profit after taxation by US$15 million (2022: decrease of US$16 million). Transactional exposure in respect of non-functional currency expenditure and revenues Certain operating and capital expenditure is incurred in currencies other than an operation\u2019s functional currency. To a lesser extent, certain sales revenue is earned in currencies other than the functional currency of operations and certain exchange control restrictions may require that funds be maintained in currencies other than the functional currency of the operation. These currency risks are managed as part of the portfolio risk management strategy. The Group may enter into forward exchange contracts when required under this strategy. Commodity price risk The risk associated with commodity prices is managed as part of the portfolio risk management strategy. Substantially all of the Group\u2019s commodity production is sold on market-based index pricing terms, with derivatives used from time to time to achieve a specific outcome. Financial instruments with commodity price risk comprise forward commodity and other derivative contracts with net liabilities at fair value of US$20 million (2022: net liabilities of US$56 million). Provisionally priced commodity sales and purchases contracts Provisionally priced sales or purchases volumes are those for which price finalisation, referenced to the relevant index, is outstanding at the reporting date. Provisional pricing mechanisms within these sales and purchases arrangements have the character of a commodity derivative. Trade receivables or payables under these contracts are carried at fair value through profit or loss using Level 2 valuation inputs based on forecast selling prices in the quotation period. The Group\u2019s exposure at 30 June 2023 to the impact of movements in commodity prices upon provisionally invoiced sales and purchases volumes was predominately around copper. The Group had 314 thousand tonnes of copper exposure as at 30 June 2023 (2022: 289 thousand tonnes) that was provisionally priced. The final price of these sales and purchases volumes will be determined during the first half of FY2024. A 10 per cent change in the price of copper realised on the provisionally priced sales, with all other factors held constant, would increase or decrease profit after taxation by US$184 million (2022: US$162 million). The relationship between commodity prices and foreign currencies is complex and movements in foreign exchange rates can impact commodity prices. Liquidity risk Refer to note 21 \u2018Net debt\u2019 for details on the Group\u2019s liquidity risk. Credit risk Credit risk is the risk that a counterparty will not meet its obligations under a financial instrument or customer contract, leading to a financial loss. The Group is exposed to credit risk from its operating activities (primarily from customer receivables) and from its financing activities, including deposits with banks and financial institutions, other short-term investments, interest rate and currency derivative contracts and other financial instruments. Refer to note 8 \u2018Trade and other receivables\u2019 and note 21 \u2018Net debt\u2019 for details on the Group credit risk. 24.2 Recognition and measurement All financial assets and liabilities, other than derivatives and trade receivables, are initially recognised at the fair value of consideration paid or received, net of transaction costs as appropriate. Financial assets are initially recognised on their trade date. Financial assets are subsequently carried at fair value or amortised cost based on: \u2013  the Group\u2019s purpose, or business model, for holding the financial asset \u2013  whether the financial asset\u2019s contractual terms give rise to cash flows that are solely payments of principal and interest The resulting Financial Statements classifications of financial assets can be summarised as follows: Contractual cash flows Business model Category Solely principal and interest Hold in order to collect contractual cash flows Amortised cost Solely principal and interest Hold in order to collect contractual cash flows and sell Fair value through other comprehensive income Solely principal and interest Hold in order to sell Fair value through profit or loss Other Any of those mentioned above Fair value through profit or loss Solely principal and interest refers to the Group receiving returns only for the time value of money and the credit risk of the counterparty for financial assets held. The main exceptions for the Group are provisionally priced receivables and derivatives which are measured at fair value through profit or loss under IFRS 9. The Group has the intention of collecting payment directly from its customers in most cases, however the Group also participates in receivables financing programs in respect of selected customers. Receivables in these portfolios which are classified as \u2018hold in order to sell\u2019, are provisionally priced receivables and are therefore held at fair value through profit or loss prior to sale to the financial institution. With the exception of derivative contracts and provisionally priced trade payables which are carried at fair value through profit or loss, the Group\u2019s financial liabilities are classified as subsequently measured at amortised cost. The Group may in addition elect to designate certain financial assets or liabilities at fair value through profit or loss or to apply hedge accounting where they are not mandatorily held at fair value through profit or loss. Fair value measurement The carrying amount of financial assets and liabilities measured at fair value is principally calculated based on inputs other than quoted prices that are observable for these financial assets or liabilities, either directly (i.e. as unquoted prices) or indirectly (i.e. derived from prices). Where no price information is available from a quoted market source, alternative market mechanisms or recent comparable transactions, fair value is estimated based on the Group\u2019s views on relevant future prices, net of valuation allowances to accommodate liquidity, modelling and other risks implicit in such estimates. The inputs used in fair value calculations are determined by the relevant segment or function. The functions support the assets and operate under a defined set of accountabilities authorised by the Executive Leadership Team. Movements in the fair value of financial assets and liabilities may be recognised through the income statement or in other comprehensive income according to the designation of the underlying instrument.  For financial assets and liabilities carried at fair value, the Group uses the following to categorise the inputs to the valuation method used based on the lowest level input that is significant to the fair value measurement as a whole: IFRS 13 Fair value hierarchy Level 1 Level 2 Level 3 Valuation inputs Based on quoted prices (unadjusted) in active markets for identical financial assets and liabilities. Based on inputs other than quoted prices included within Level 1 that are observable for the financial asset or liability, either directly (i.e. as unquoted prices) or indirectly (i.e. derived from prices). Based on inputs not observable in the market using appropriate valuation models, including discounted cash flow modelling. 24.3  Financial assets and liabilities The financial assets and liabilities are presented by class in the table below at their carrying amounts. IFRS 13  Fair value hierarchy Level 1 IFRS 9 Classification 2023  US$M 2022  US$M Current cross currency and interest rate swaps 2 2 Fair value through profit or loss 34  \u2212 Current other derivative contracts 3 2,3 Fair value through profit or loss 407 326 Current other financial assets Amortised cost  \u2212 100 Current other investments 4 1,2 Fair value through profit or loss 29 203 Non-current cross currency and interest rate swaps 2 2 Fair value through profit or loss 149 136 Non-current other derivative contracts 3 2,3 Fair value through profit or loss 228 16 Non-current other financial assets 5 3 Fair value through profit or loss 246 273 Non-current investment in shares 1,3 Fair value through other comprehensive income 224 138 Non-current other investments 4 1,2 Fair value through profit or loss 268 239 Total other financial assets 1,585 1,431 Cash and cash equivalents Amortised cost 12,428 17,236 Trade and other receivables 6 Amortised cost 1,506 1,674 Provisionally priced trade receivables 2 Fair value through profit or loss 2,705 3,478 Total financial assets 18,224 23,819 Non-financial assets 83,072 71,347 Total assets 101,296 95,166 Current cross currency and interest rate swaps 2 2 Fair value through profit or loss 147 358 Current other derivative contracts 2 Fair value through profit or loss 176 118 Current other financial liabilities 7 Amortised cost 79 103 Non-current cross currency and interest rate swaps 2 2 Fair value through profit or loss 1,608 1,466 Non-current other derivative contracts 3 2,3 Fair value through profit or loss 82 31 Non-current other financial liabilities 7 Amortised cost 467 500 Total other financial liabilities 2,559 2,576 Trade and other payables 8 Amortised cost 5,338 5,223 Provisionally priced trade payables 2 Fair value through profit or loss 841 1,385 Bank overdrafts and short-term borrowings 9 Amortised cost 5  \u2212 Bank loans 9 Amortised cost 7,502 2,472 Notes and debentures 9 Amortised cost 11,819 11,363 Lease liabilities 10 3,019 2,576 Other 9 Amortised cost  \u2212 17 Total financial liabilities 31,083 25,612 Non-financial liabilities 21,683 20,788 Total liabilities 52,766 46,400 1  All of the Group\u2019s financial assets and financial liabilities recognised at fair value were valued using market observable inputs categorised as Level 2 unless specified otherwise in the following footnotes. 2  Cross currency and interest rate swaps are valued using market data including interest rate curves and foreign exchange rates. A discounted cash flow approach is used to derive the fair value of cross currency and interest rate swaps at the reporting date. 3  Includes net other derivative assets of US$46 million related to power purchase contract agreements that are categorised as Level 3 (2022: US$ nil). 4  Includes investments held by BHP Foundation which are restricted and not available for general use by the Group of US$290 million (2022: US$252 million) of which other investments (mainly US Treasury Notes) of US$138 million categorised as Level 1 (2022: US$119 million). 5  Includes receivables contingent on outcome of future events relating to mining and regulatory approvals of US$246 million (2022: US$233 million). 6  Excludes input taxes of US$531 million (2022: US$427 million) included in other receivables. 7  Includes the discounted settlement liability in relation to the cancellation of power contracts at the Group\u2019s Escondida operations. 8  Excludes input taxes of US$121 million (2022: US$79 million) included in other payables. 9  All interest bearing liabilities, excluding lease liabilities, are unsecured. 10  Lease liabilities are measured in accordance with IFRS 16/AASB 16 \u2018Leases\u2019. The carrying amounts in the table above generally approximate to fair value. In the case of US$534 million (2022: US$3,018 million) of fixed rate debt not swapped to floating rate, the fair value at 30 June 2023 was US$538 million (2022: US$3,126 million). The fair value is determined using a method that can be categorised as Level 2 and uses inputs based on benchmark interest rates, alternative market mechanisms or recent comparable transactions. For financial instruments that are carried at fair value on a recurring basis, the Group determines whether transfers have occurred between levels in the fair value hierarchy by reassessing categorisation at the end of each reporting period. There were no transfers between categories during the period. Offsetting financial assets and liabilities The Group enters into money market deposits and derivative transactions under International Swaps and Derivatives Association master netting agreements that do not meet the offsetting criteria in IAS 32/AASB 132 \u2018Financial Instruments: Presentation\u2019, but allow for the related amounts to be set- off in certain circumstances. The amounts set out as cross currency and interest rate swaps in the table above represent the derivative financial assets and liabilities of the Group that may be subject to the above arrangements and are presented on a gross basis. 24.4  Derivatives and hedge accounting The Group uses derivatives to hedge its exposure to certain market risks and may elect to apply hedge accounting. Hedge accounting Derivatives are included within financial assets or liabilities at fair value through profit or loss unless they are designated as effective hedging instruments. Financial instruments in this category are classified as current if they are due or expected to be settled within 12 months otherwise they are classified as non-current. Where hedge accounting is applied, at the start of the transaction, the Group documents the type of hedge, the relationship between the hedging instrument and hedged items and its risk management objective and strategy for undertaking various hedge transactions. The documentation also demonstrates that the hedge is expected to be effective. The Group applies the following types of hedge accounting to its derivatives hedging the interest rate and currency risks of its notes and debentures: \u2013  Fair value hedges \u2013 the fair value gain or loss on interest rate and cross currency swaps relating to interest rate risk, together with the change in the fair value of the hedged fixed rate borrowings attributable to interest rate risk are recognised immediately in the income statement. If the hedge no longer meets the criteria for hedge accounting, the fair value adjustment on the note or debenture is amortised to the income statement over the period to maturity using a recalculated effective interest rate. \u2013  Cash flow hedges \u2013 changes in the fair value of cross currency interest rate swaps which hedge foreign currency cash flows on the notes and debentures are recognised directly in other comprehensive income and accumulated in the cash flow hedging reserve. To the extent a hedge is ineffective, changes in fair value are recognised immediately in the income statement. When a hedging instrument expires, or is sold, terminated or exercised, or when a hedge no longer meets the criteria for hedge accounting, any cumulative gain or loss existing in equity at that time remains in equity and is amortised to the income statement over the period to the hedged item\u2019s maturity. When hedged, the Group hedges the full notional value of notes or debentures. However, certain components of the fair value of derivatives are not permitted under IFRS 9 to be included in the hedge accounting above. Certain costs of hedging are permitted to be recognised in other comprehensive income. Any change in the fair value of a derivative that does not qualify for hedge accounting, or is ineffective in hedging the designated risk due to contractual differences between the hedged item and hedging instrument, is recognised immediately in the income statement. The table below shows the carrying amounts of the Group\u2019s notes and debentures by currency and the derivatives which hedge them: \u2013  The carrying amount of the notes and debentures includes foreign exchange remeasurement to period-end rates and fair value adjustments when included in a fair value hedge. \u2013  The breakdown of the hedging derivatives includes remeasurement of foreign currency notional values at period-end rates, fair value movements due to interest rate risk, foreign currency cash flows designated into cash flow hedges, costs of hedging recognised in other comprehensive income, ineffectiveness recognised in the income statement and accruals or prepayments. \u2013  The hedged value of notes and debentures includes their carrying amounts adjusted for the offsetting derivative fair value movements due to foreign currency and interest rate risk remeasurement. 2023  US$M Carrying amount of notes and debentures Fair value of derivatives Hedged value of notes and debentures 2 Foreign exchange notional at spot rates Interest  rate risk Recognised in cash flow hedging reserve Recognised  in cost of hedging reserve Recognised in  the income statement 1 Accrued  cash flows Total A B C D E F G B to G A + B + C USD 7,245  \u2212 214  \u2212  \u2212 32 23 269 7,459 GBP 1,566 522 274 24 (9) (69) 35 777 2,362 EUR 3,008 434 302 (39) 10 (49) (132) 526 3,744 Total 11,819 956 790 (15) 1 (86) (74) 1,572 13,565 2022  US$M Carrying  amount of  notes and debentures Fair value of derivatives Hedged value  of notes and debentures 2 Foreign exchange notional at  spot rates Interest  rate risk Recognised in cash flow hedging  reserve Recognised  in cost of hedging  reserve Recognised in  the income statement 1 Accrued  cash flows Total A B C D E F G B to G A + B + C USD 4,740  \u2212 (16)  \u2212  \u2212 (7) 86 63 4,724 GBP 2,599 796 (115) (35) 13 26 42 727 3,280 EUR 3,449 585 112 (16) 8 (4) 45 730 4,146 CAD 575 167 5 (8) 6 (3) 1 168 747 Total 11,363 1,548 (14) (59) 27 12 174 1,688 12,897 1  Predominantly related to ineffectiveness. 2  Includes US$534 million (2022: US$3,018 million) of fixed rate debt not swapped to floating rate that is not in a hedging relationship. The weighted average interest rate payable is USD SOFR +1.54 per cent (2022: USD LIBOR + 1.74 per cent). Refer to note 23 \u2018Net finance costs\u2019 for details of net finance costs for the year. Movements in reserves relating to hedge accounting The following table shows a reconciliation of the components of equity and an analysis of the movements in reserves for all hedges. For a description of these reserves, refer to note 18 \u2018Other equity\u2019. 2023  US$M Cash flow hedging reserve  Cost of hedging reserve Gross Tax Net Gross Tax Net Total At the beginning of the financial year 59 (18) 41 (27) 8 (19) 22 Add: Change in fair value of hedging instrument recognised in OCI 95 (29) 66  \u2212  \u2212  \u2212 66 Less: Reclassified from reserves to financial expenses \u2013 recognised through OCI (174) 53 (121) 26 (8) 18 (103) Less: Loss/(gain) transferred to balance sheet related items 35 (11) 24  \u2212  \u2212  \u2212 24 At the end of the financial year 15 (5) 10 (1)  \u2212 (1) 9 2022  US$M Cash flow hedging reserve  Cost of hedging reserve Gross Tax Net Gross Ta x Net Total At the beginning of the financial year 142 (42) 100 (77) 23 (54) 46 Add: Change in fair value of hedging instrument recognised in OCI (914) 274 (640)  \u2212  \u2212  \u2212 (640) Less: Reclassified from reserves to financial expenses \u2013 recognised through OCI 831 (250) 581 50 (15) 35 616 At the end of the financial year 59 (18) 41 (27) 8 (19) 22 Changes in interest bearing liabilities and related derivatives resulting from financing activities The movement in the year in the Group\u2019s interest bearing liabilities and related derivatives are as follows: 2023  US$M Interest bearing liabilities Derivatives liabilities/ (assets) Bank loans Notes and debentures Lease liabilities Bank overdraft and short-term borrowings Other Cross currency and interest rate swaps  Total At the beginning of the financial year 2,472 11,363 2,576  \u2212 17 1,688 Proceeds from interest bearing liabilities 5,450 2,732  \u2212  \u2212  \u2212  \u2212 8,182 Settlements of debt related instruments  \u2212  \u2212  \u2212  \u2212  \u2212 (677) (677) Repayment of interest bearing liabilities (1,087) (1,610) (576)  \u2212 (16)  \u2212 (3,289) Change from Net financing cash flows 4,363 1,122 (576)  \u2212 (16) (677) 4,216 Other movements: Acquisition of subsidiaries and operations 688  \u2212 423  \u2212  \u2212  \u2212 Interest rate impacts  \u2212 (803)  \u2212  \u2212  \u2212 691 Foreign exchange impacts  (23) 128 12  \u2212  \u2212 (127) Lease additions  \u2212  \u2212 542  \u2212  \u2212  \u2212 Remeasurement of index-linked freight contracts  \u2212  \u2212 53  \u2212  \u2212  \u2212 Other interest bearing liabilities/derivative related changes 2 9 (11) 5 (1) (3) At the end of the financial year 7,502 11,819 3,019 5  \u2212 1,572 2022  US$M Interest bearing liabilities Derivatives (assets)/ liabilities Bank loans Notes and debentures Lease liabilities Bank overdraft and short-term borrowings Other Cross currency and interest rate swaps  Total At the beginning of the financial year 2,260 14,769 3,896  \u2212 58 (557) Proceeds from interest bearing liabilities 1,150  \u2212  \u2212  \u2212 14  \u2212 1,164 Settlements of debt related instruments  \u2212  \u2212  \u2212  \u2212  \u2212  \u2212  \u2212 Repayment of interest bearing liabilities 1 (941) (1,232) (1,163)  \u2212 (55)  \u2212 (3,391) Change from Net financing cash flows 209 (1,232) (1,163)  \u2212 (41)  \u2212 (2,227) Other movements: Divestment and demerger of subsidiaries and operations  \u2212  \u2212 (492)  \u2212  \u2212  \u2212 Interest rate impacts  \u2212 (1,286)  \u2212  \u2212  \u2212 1,277 Foreign exchange impacts  3 (894) (126)  \u2212 (2) 898 Lease additions  \u2212  \u2212 866  \u2212  \u2212  \u2212 Remeasurement of index-linked freight contracts  \u2212  \u2212 (369)  \u2212  \u2212  \u2212 Other interest bearing liabilities/derivative related changes  \u2212 6 (36)  \u2212 2 70 At the end of the financial year 2,472 11,363 2,576  \u2212 17 1,688 1  FY2022 includes US$33 million of Discontinued operations cash flows. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialRiskManagementExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-679": {
   "value": "Market risk management The Group\u2019s activities expose it to market risks associated with movements in interest rates, foreign currencies and commodity prices. Under the strategy outlined above, the Group seeks to achieve financing costs, currency impacts, input costs and commodity prices on a floating or index basis. In executing the strategy, financial instruments are potentially employed in three distinct but related activities. The following table summarises these activities and the key risk management processes: Activity Key risk management processes 1 Risk mitigation On an exception basis, hedging for the purposes of mitigating risk related to specific and significant expenditure on investments or capital projects will be executed if necessary to support the Group\u2019s strategic objectives. Execution of transactions within approved mandates. 2 Economic hedging of commodity sales, operating costs, short-term cash deposits, other monetary items and debt instruments Where Group commodity production is sold to customers on pricing terms that deviate from the relevant index target and where a relevant derivatives market exists, financial instruments may be executed as an economic hedge to align the revenue price exposure with the index target and US dollars. Where debt is issued in a currency other than the US dollar and/or at a fixed interest rate, fair value and cash flow hedges may be executed to align the debt exposure with the Group\u2019s functional currency of US dollars and/or to swap to a floating interest rate. Where short-term cash deposits and other monetary items are denominated in a currency other than US dollars, derivative financial instruments may be executed to align the foreign exchange exposure to the Group\u2019s functional currency of US dollars. Measuring and reporting the exposure in customer commodity contracts and issued debt instruments. Executing hedging derivatives to align the total group exposure to the index target. Execution of transactions within approved mandates. 3 Strategic financial transactions Opportunistic transactions may be executed with financial instruments to capture value from perceived market over/under valuations. Execution of transactions within approved mandates. Primary responsibility for the identification and control of financial risks, including authorising and monitoring the use of financial instruments for the above activities and stipulating policy thereon, rests with the Financial Risk Management Committee under authority delegated by the Chief Executive Officer. Interest rate risk The Group is exposed to interest rate risk on its outstanding borrowings and short-term cash deposits from the possibility that changes in interest rates will affect future cash flows or the fair value of fixed interest rate financial instruments. Interest rate risk is managed as part of the portfolio risk management strategy. The majority of the Group\u2019s debt is issued at fixed interest rates. The Group has also drawn on a facility of US$5.0 billion to fund the acquisition of OZL that was referenced to floating rates. The Group has entered into interest rate swaps and cross currency interest rate swaps to convert most of its fixed interest rate exposure to floating US dollar interest rate exposure. As at 30 June 2023, 98 per cent of the Group\u2019s borrowings were exposed to floating interest rates inclusive of the effect of swaps (2022: 80 per cent). The fair value of interest rate swaps and cross currency interest rate swaps in hedge relationships used to hedge both interest rate and foreign currency risks are shown in the valuation hierarchy in section 24.4 \u2018Derivatives and hedge accounting\u2019. Based on the net debt position as at 30 June 2023, taking into account interest rate swaps and cross currency interest rate swaps, it is estimated that a one percentage point increase in the Secured Overnight Financing Rate (SOFR) interest rate will decrease the Group\u2019s equity and profit after taxation by US$58 million (2022: increase of US$29 million). This assumes the change in interest rates is effective from the beginning of the financial year and the fixed/floating mix and balances are constant over the year. Interest Rate Benchmark Reform The London Interbank Offered Rate (LIBOR) and other benchmark interest rates are being replaced by alternative risk-free rates (ARR) as part of inter- bank offer rate (IBOR) reform. Sterling LIBOR ceased to be published on 1 January 2022 and USD LIBOR will no longer be published after 30 June 2023. Amendments to IFRS 9/AASB 9 \u2018Financial Instruments\u2019, IFRS 7/AASB 7 \u2018Financial Instruments: Disclosures\u2019 and IFRS 16/AASB 16 \u2018Leases\u2019 in relation to IBOR reform early adopted by the Group in previous periods impact the Group\u2019s cross currency and interest rate swaps, which prior to IBOR reform referenced the US LIBOR benchmark, and the associated hedge accounting. These amendments provide relief from applying certain hedge accounting requirements to hedging arrangements directly impacted by IBOR reform. In particular, where changes to the Group\u2019s instruments arise solely as a result of IBOR reform and do not change the economic substance of the Group\u2019s arrangements, the Group is able to maintain its existing hedge relationships and accounting. During the year ended 30 June 2023, the Group actively transitioned all impacted cross currency and interest rate swaps from US LIBOR to the alternative, widely adopted SOFR benchmark. As the transition resulted solely from IBOR reform, the Group has applied the relief available in IFRS 9 and continues to apply hedge accounting to its hedging arrangements, including accounting for ineffectiveness. Refer to section 24.4 \u2018Derivatives and hedge accounting\u2019 for further information. The Group does not hold any material lease arrangements that contain reference to the existing benchmarks and as a result there is no material impact on lease liabilities or right-of-use assets at 30 June 2023. The Group\u2019s revolving credit facility was restructured to reference to Alternative Reference Rates (ARRs) and remains undrawn. Furthermore, in the period, Escondida has executed new SOFR linked loans and has amended existing US LIBOR linked loans with lenders, so that the applicable floating interest rate reference 3M or 6M Term SOFR rates. Currency risk The US dollar is the predominant functional currency within the Group and as a result, currency exposures arise from transactions and balances in currencies other than the US dollar. The Group\u2019s potential currency exposures comprise: \u2013  translational exposure in respect of non-functional currency monetary items \u2013  transactional exposure in respect of non-functional currency expenditure and revenues The Group\u2019s foreign currency risk is managed as part of the portfolio risk management strategy. Translational exposure in respect of non-functional currency monetary items Monetary items, including financial assets and liabilities, denominated in currencies other than the functional currency of an operation are restated at the end of each reporting period to US dollar equivalents and the associated gain or loss is taken to the income statement. The exception is foreign exchange gains or losses on foreign currency denominated provisions for closure and rehabilitation at operating sites, which are capitalised in property, plant and equipment. The Group has entered into cross currency interest rate swaps and foreign exchange forwards to convert its significant foreign currency exposures in respect of monetary items into US dollars. Fluctuations in foreign exchange rates are therefore not expected to have a significant impact on equity and profit after tax. The following table shows the carrying values of financial assets and liabilities at the end of the reporting period denominated in currencies other than the US dollar that are exposed to foreign currency risk: Net financial (liabilities)/assets \u2013 by currency of denomination 2023  US$M 2022  US$M AUD (4,168) (3,649) CLP (74) (602) GBP 353 388 EUR 217 280 Other 43 187 Total (3,629) (3,396) The principal non-functional currencies to which the Group is exposed are the Australian dollar, the Chilean peso, the Pound sterling and the Euro. Based on the Group\u2019s net financial assets and liabilities as at 30 June 2023, a weakening of the US dollar against these currencies (one cent strengthening in Australian dollar, 10 pesos strengthening in Chilean peso, one penny strengthening in Pound sterling and one cent strengthening in Euro), with all other variables held constant, would decrease the Group\u2019s equity and profit after taxation by US$15 million (2022: decrease of US$16 million). Transactional exposure in respect of non-functional currency expenditure and revenues Certain operating and capital expenditure is incurred in currencies other than an operation\u2019s functional currency. To a lesser extent, certain sales revenue is earned in currencies other than the functional currency of operations and certain exchange control restrictions may require that funds be maintained in currencies other than the functional currency of the operation. These currency risks are managed as part of the portfolio risk management strategy. The Group may enter into forward exchange contracts when required under this strategy. The risk associated with commodity prices is managed as part of the portfolio risk management strategy. Substantially all of the Group\u2019s commodity production is sold on market-based index pricing terms, with derivatives used from time to time to achieve a specific outcome. Financial instruments with commodity price risk comprise forward commodity and other derivative contracts with net liabilities at fair value of US$20 million (2022: net liabilities of US$56 million). Provisionally priced commodity sales and purchases contracts Provisionally priced sales or purchases volumes are those for which price finalisation, referenced to the relevant index, is outstanding at the reporting date. Provisional pricing mechanisms within these sales and purchases arrangements have the character of a commodity derivative. Trade receivables or payables under these contracts are carried at fair value through profit or loss using Level 2 valuation inputs based on forecast selling prices in the quotation period. The Group\u2019s exposure at 30 June 2023 to the impact of movements in commodity prices upon provisionally invoiced sales and purchases volumes was predominately around copper. The Group had 314 thousand tonnes of copper exposure as at 30 June 2023 (2022: 289 thousand tonnes) that was provisionally priced. The final price of these sales and purchases volumes will be determined during the first half of FY2024. A 10 per cent change in the price of copper realised on the provisionally priced sales, with all other factors held constant, would increase or decrease profit after taxation by US$184 million (2022: US$162 million). The relationship between commodity prices and foreign currencies is complex and movements in foreign exchange rates can impact commodity prices. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfMarketRiskExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-714": {
   "value": "Activity Key risk management processes 1 Risk mitigation On an exception basis, hedging for the purposes of mitigating risk related to specific and significant expenditure on investments or capital projects will be executed if necessary to support the Group\u2019s strategic objectives. Execution of transactions within approved mandates. 2 Economic hedging of commodity sales, operating costs, short-term cash deposits, other monetary items and debt instruments Where Group commodity production is sold to customers on pricing terms that deviate from the relevant index target and where a relevant derivatives market exists, financial instruments may be executed as an economic hedge to align the revenue price exposure with the index target and US dollars. Where debt is issued in a currency other than the US dollar and/or at a fixed interest rate, fair value and cash flow hedges may be executed to align the debt exposure with the Group\u2019s functional currency of US dollars and/or to swap to a floating interest rate. Where short-term cash deposits and other monetary items are denominated in a currency other than US dollars, derivative financial instruments may be executed to align the foreign exchange exposure to the Group\u2019s functional currency of US dollars. Measuring and reporting the exposure in customer commodity contracts and issued debt instruments. Executing hedging derivatives to align the total group exposure to the index target. Execution of transactions within approved mandates. 3 Strategic financial transactions Opportunistic transactions may be executed with financial instruments to capture value from perceived market over/under valuations. Execution of transactions within approved mandates. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRiskManagementStrategyRelatedToHedgeAccountingExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-715": {
   "value": "Interest rate risk The Group is exposed to interest rate risk on its outstanding borrowings and short-term cash deposits from the possibility that changes in interest rates will affect future cash flows or the fair value of fixed interest rate financial instruments. Interest rate risk is managed as part of the portfolio risk management strategy. The majority of the Group\u2019s debt is issued at fixed interest rates. The Group has also drawn on a facility of US$5.0 billion to fund the acquisition of OZL that was referenced to floating rates. The Group has entered into interest rate swaps and cross currency interest rate swaps to convert most of its fixed interest rate exposure to floating US dollar interest rate exposure. As at 30 June 2023, 98 per cent of the Group\u2019s borrowings were exposed to floating interest rates inclusive of the effect of swaps (2022: 80 per cent). The fair value of interest rate swaps and cross currency interest rate swaps in hedge relationships used to hedge both interest rate and foreign currency risks are shown in the valuation hierarchy in section 24.4 \u2018Derivatives and hedge accounting\u2019. Based on the net debt position as at 30 June 2023, taking into account interest rate swaps and cross currency interest rate swaps, it is estimated that a one percentage point increase in the Secured Overnight Financing Rate (SOFR) interest rate will decrease the Group\u2019s equity and profit after taxation by US$58 million (2022: increase of US$29 million). This assumes the change in interest rates is effective from the beginning of the financial year and the fixed/floating mix and balances are constant over the year. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSignificantInterestRateBenchmarksToWhichEntitysHedgingRelationshipsAreExposedExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-705": {
   "value": "Based on the net debt position as at 30 June 2023, taking into account interest rate swaps and cross currency interest rate swaps, it is estimated that a one percentage point increase in the Secured Overnight Financing Rate (SOFR) interest rate will decrease the Group\u2019s equity and profit after taxation by US$58 million (2022: increase of US$29 million). This assumes the change in interest rates is effective from the beginning of the financial year and the fixed/floating mix and balances are constant over the year. The principal non-functional currencies to which the Group is exposed are the Australian dollar, the Chilean peso, the Pound sterling and the Euro. Based on the Group\u2019s net financial assets and liabilities as at 30 June 2023, a weakening of the US dollar against these currencies (one cent strengthening in Australian dollar, 10 pesos strengthening in Chilean peso, one penny strengthening in Pound sterling and one cent strengthening in Euro), with all other variables held constant, would decrease the Group\u2019s equity and profit after taxation by US$15 million (2022: decrease of US$16 million). The Group had 314 thousand tonnes of copper exposure as at 30 June 2023 (2022: 289 thousand tonnes) that was provisionally priced. The final price of these sales and purchases volumes will be determined during the first half of FY2024. A 10 per cent change in the price of copper realised on the provisionally priced sales, with all other factors held constant, would increase or decrease profit after taxation by US$184 million (2022: US$162 million). The relationship between commodity prices and foreign currencies is complex and movements in foreign exchange rates can impact commodity prices. ",
   "dimensions": {
    "concept": "ifrs-full:SensitivityAnalysisForEachTypeOfMarketRisk",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-716": {
   "value": "Interest Rate Benchmark Reform The London Interbank Offered Rate (LIBOR) and other benchmark interest rates are being replaced by alternative risk-free rates (ARR) as part of inter- bank offer rate (IBOR) reform. Sterling LIBOR ceased to be published on 1 January 2022 and USD LIBOR will no longer be published after 30 June 2023. Amendments to IFRS 9/AASB 9 \u2018Financial Instruments\u2019, IFRS 7/AASB 7 \u2018Financial Instruments: Disclosures\u2019 and IFRS 16/AASB 16 \u2018Leases\u2019 in relation to IBOR reform early adopted by the Group in previous periods impact the Group\u2019s cross currency and interest rate swaps, which prior to IBOR reform referenced the US LIBOR benchmark, and the associated hedge accounting. These amendments provide relief from applying certain hedge accounting requirements to hedging arrangements directly impacted by IBOR reform. In particular, where changes to the Group\u2019s instruments arise solely as a result of IBOR reform and do not change the economic substance of the Group\u2019s arrangements, the Group is able to maintain its existing hedge relationships and accounting. During the year ended 30 June 2023, the Group actively transitioned all impacted cross currency and interest rate swaps from US LIBOR to the alternative, widely adopted SOFR benchmark. As the transition resulted solely from IBOR reform, the Group has applied the relief available in IFRS 9 and continues to apply hedge accounting to its hedging arrangements, including accounting for ineffectiveness. Refer to section 24.4 \u2018Derivatives and hedge accounting\u2019 for further information. The Group does not hold any material lease arrangements that contain reference to the existing benchmarks and as a result there is no material impact on lease liabilities or right-of-use assets at 30 June 2023. The Group\u2019s revolving credit facility was restructured to reference to Alternative Reference Rates (ARRs) and remains undrawn. Furthermore, in the period, Escondida has executed new SOFR linked loans and has amended existing US LIBOR linked loans with lenders, so that the applicable floating interest rate reference 3M or 6M Term SOFR rates. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInformationAboutEffectOfInterestRateBenchmarkReformOnEntitysFinancialInstrumentsAndRiskManagementStrategyExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-768": {
   "value": "24.2 Recognition and measurement All financial assets and liabilities, other than derivatives and trade receivables, are initially recognised at the fair value of consideration paid or received, net of transaction costs as appropriate. Financial assets are initially recognised on their trade date. Financial assets are subsequently carried at fair value or amortised cost based on: \u2013  the Group\u2019s purpose, or business model, for holding the financial asset \u2013  whether the financial asset\u2019s contractual terms give rise to cash flows that are solely payments of principal and interest The resulting Financial Statements classifications of financial assets can be summarised as follows: Contractual cash flows Business model Category Solely principal and interest Hold in order to collect contractual cash flows Amortised cost Solely principal and interest Hold in order to collect contractual cash flows and sell Fair value through other comprehensive income Solely principal and interest Hold in order to sell Fair value through profit or loss Other Any of those mentioned above Fair value through profit or loss Solely principal and interest refers to the Group receiving returns only for the time value of money and the credit risk of the counterparty for financial assets held. The main exceptions for the Group are provisionally priced receivables and derivatives which are measured at fair value through profit or loss under IFRS 9. The Group has the intention of collecting payment directly from its customers in most cases, however the Group also participates in receivables financing programs in respect of selected customers. Receivables in these portfolios which are classified as \u2018hold in order to sell\u2019, are provisionally priced receivables and are therefore held at fair value through profit or loss prior to sale to the financial institution. With the exception of derivative contracts and provisionally priced trade payables which are carried at fair value through profit or loss, the Group\u2019s financial liabilities are classified as subsequently measured at amortised cost. The Group may in addition elect to designate certain financial assets or liabilities at fair value through profit or loss or to apply hedge accounting where they are not mandatorily held at fair value through profit or loss. Fair value measurement The carrying amount of financial assets and liabilities measured at fair value is principally calculated based on inputs other than quoted prices that are observable for these financial assets or liabilities, either directly (i.e. as unquoted prices) or indirectly (i.e. derived from prices). Where no price information is available from a quoted market source, alternative market mechanisms or recent comparable transactions, fair value is estimated based on the Group\u2019s views on relevant future prices, net of valuation allowances to accommodate liquidity, modelling and other risks implicit in such estimates. The inputs used in fair value calculations are determined by the relevant segment or function. The functions support the assets and operate under a defined set of accountabilities authorised by the Executive Leadership Team. Movements in the fair value of financial assets and liabilities may be recognised through the income statement or in other comprehensive income according to the designation of the underlying instrument. For financial assets and liabilities carried at fair value, the Group uses the following to categorise the inputs to the valuation method used based on the lowest level input that is significant to the fair value measurement as a whole: IFRS 13 Fair value hierarchy Level 1 Level 2 Level 3 Valuation inputs Based on quoted prices (unadjusted) in active markets for identical financial assets and liabilities. Based on inputs other than quoted prices included within Level 1 that are observable for the financial asset or liability, either directly (i.e. as unquoted prices) or indirectly (i.e. derived from prices). Based on inputs not observable in the market using appropriate valuation models, including discounted cash flow modelling. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinancialLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-749": {
   "value": "24.2 Recognition and measurement All financial assets and liabilities, other than derivatives and trade receivables, are initially recognised at the fair value of consideration paid or received, net of transaction costs as appropriate. Financial assets are initially recognised on their trade date. Financial assets are subsequently carried at fair value or amortised cost based on: \u2013  the Group\u2019s purpose, or business model, for holding the financial asset \u2013  whether the financial asset\u2019s contractual terms give rise to cash flows that are solely payments of principal and interest The resulting Financial Statements classifications of financial assets can be summarised as follows: Contractual cash flows Business model Category Solely principal and interest Hold in order to collect contractual cash flows Amortised cost Solely principal and interest Hold in order to collect contractual cash flows and sell Fair value through other comprehensive income Solely principal and interest Hold in order to sell Fair value through profit or loss Other Any of those mentioned above Fair value through profit or loss Solely principal and interest refers to the Group receiving returns only for the time value of money and the credit risk of the counterparty for financial assets held. The main exceptions for the Group are provisionally priced receivables and derivatives which are measured at fair value through profit or loss under IFRS 9. The Group has the intention of collecting payment directly from its customers in most cases, however the Group also participates in receivables financing programs in respect of selected customers. Receivables in these portfolios which are classified as \u2018hold in order to sell\u2019, are provisionally priced receivables and are therefore held at fair value through profit or loss prior to sale to the financial institution. With the exception of derivative contracts and provisionally priced trade payables which are carried at fair value through profit or loss, the Group\u2019s financial liabilities are classified as subsequently measured at amortised cost. The Group may in addition elect to designate certain financial assets or liabilities at fair value through profit or loss or to apply hedge accounting where they are not mandatorily held at fair value through profit or loss. Fair value measurement The carrying amount of financial assets and liabilities measured at fair value is principally calculated based on inputs other than quoted prices that are observable for these financial assets or liabilities, either directly (i.e. as unquoted prices) or indirectly (i.e. derived from prices). Where no price information is available from a quoted market source, alternative market mechanisms or recent comparable transactions, fair value is estimated based on the Group\u2019s views on relevant future prices, net of valuation allowances to accommodate liquidity, modelling and other risks implicit in such estimates. The inputs used in fair value calculations are determined by the relevant segment or function. The functions support the assets and operate under a defined set of accountabilities authorised by the Executive Leadership Team. Movements in the fair value of financial assets and liabilities may be recognised through the income statement or in other comprehensive income according to the designation of the underlying instrument. For financial assets and liabilities carried at fair value, the Group uses the following to categorise the inputs to the valuation method used based on the lowest level input that is significant to the fair value measurement as a whole: IFRS 13 Fair value hierarchy Level 1 Level 2 Level 3 Valuation inputs Based on quoted prices (unadjusted) in active markets for identical financial assets and liabilities. Based on inputs other than quoted prices included within Level 1 that are observable for the financial asset or liability, either directly (i.e. as unquoted prices) or indirectly (i.e. derived from prices). Based on inputs not observable in the market using appropriate valuation models, including discounted cash flow modelling. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinancialAssetsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-680": {
   "value": "Fair value measurement The carrying amount of financial assets and liabilities measured at fair value is principally calculated based on inputs other than quoted prices that are observable for these financial assets or liabilities, either directly (i.e. as unquoted prices) or indirectly (i.e. derived from prices). Where no price information is available from a quoted market source, alternative market mechanisms or recent comparable transactions, fair value is estimated based on the Group\u2019s views on relevant future prices, net of valuation allowances to accommodate liquidity, modelling and other risks implicit in such estimates. The inputs used in fair value calculations are determined by the relevant segment or function. The functions support the assets and operate under a defined set of accountabilities authorised by the Executive Leadership Team. Movements in the fair value of financial assets and liabilities may be recognised through the income statement or in other comprehensive income according to the designation of the underlying instrument.  For financial assets and liabilities carried at fair value, the Group uses the following to categorise the inputs to the valuation method used based on the lowest level input that is significant to the fair value measurement as a whole: IFRS 13 Fair value hierarchy Level 1 Level 2 Level 3 Valuation inputs Based on quoted prices (unadjusted) in active markets for identical financial assets and liabilities. Based on inputs other than quoted prices included within Level 1 that are observable for the financial asset or liability, either directly (i.e. as unquoted prices) or indirectly (i.e. derived from prices). Based on inputs not observable in the market using appropriate valuation models, including discounted cash flow modelling. 24.3  Financial assets and liabilities The financial assets and liabilities are presented by class in the table below at their carrying amounts. IFRS 13  Fair value hierarchy Level 1 IFRS 9 Classification 2023  US$M 2022  US$M Current cross currency and interest rate swaps 2 2 Fair value through profit or loss 34  \u2212 Current other derivative contracts 3 2,3 Fair value through profit or loss 407 326 Current other financial assets Amortised cost  \u2212 100 Current other investments 4 1,2 Fair value through profit or loss 29 203 Non-current cross currency and interest rate swaps 2 2 Fair value through profit or loss 149 136 Non-current other derivative contracts 3 2,3 Fair value through profit or loss 228 16 Non-current other financial assets 5 3 Fair value through profit or loss 246 273 Non-current investment in shares 1,3 Fair value through other comprehensive income 224 138 Non-current other investments 4 1,2 Fair value through profit or loss 268 239 Total other financial assets 1,585 1,431 Cash and cash equivalents Amortised cost 12,428 17,236 Trade and other receivables 6 Amortised cost 1,506 1,674 Provisionally priced trade receivables 2 Fair value through profit or loss 2,705 3,478 Total financial assets 18,224 23,819 Non-financial assets 83,072 71,347 Total assets 101,296 95,166 Current cross currency and interest rate swaps 2 2 Fair value through profit or loss 147 358 Current other derivative contracts 2 Fair value through profit or loss 176 118 Current other financial liabilities 7 Amortised cost 79 103 Non-current cross currency and interest rate swaps 2 2 Fair value through profit or loss 1,608 1,466 Non-current other derivative contracts 3 2,3 Fair value through profit or loss 82 31 Non-current other financial liabilities 7 Amortised cost 467 500 Total other financial liabilities 2,559 2,576 Trade and other payables 8 Amortised cost 5,338 5,223 Provisionally priced trade payables 2 Fair value through profit or loss 841 1,385 Bank overdrafts and short-term borrowings 9 Amortised cost 5  \u2212 Bank loans 9 Amortised cost 7,502 2,472 Notes and debentures 9 Amortised cost 11,819 11,363 Lease liabilities 10 3,019 2,576 Other 9 Amortised cost  \u2212 17 Total financial liabilities 31,083 25,612 Non-financial liabilities 21,683 20,788 Total liabilities 52,766 46,400 1  All of the Group\u2019s financial assets and financial liabilities recognised at fair value were valued using market observable inputs categorised as Level 2 unless specified otherwise in the following footnotes. 2  Cross currency and interest rate swaps are valued using market data including interest rate curves and foreign exchange rates. A discounted cash flow approach is used to derive the fair value of cross currency and interest rate swaps at the reporting date. 3  Includes net other derivative assets of US$46 million related to power purchase contract agreements that are categorised as Level 3 (2022: US$ nil). 4  Includes investments held by BHP Foundation which are restricted and not available for general use by the Group of US$290 million (2022: US$252 million) of which other investments (mainly US Treasury Notes) of US$138 million categorised as Level 1 (2022: US$119 million). 5  Includes receivables contingent on outcome of future events relating to mining and regulatory approvals of US$246 million (2022: US$233 million). 6  Excludes input taxes of US$531 million (2022: US$427 million) included in other receivables. 7  Includes the discounted settlement liability in relation to the cancellation of power contracts at the Group\u2019s Escondida operations. 8  Excludes input taxes of US$121 million (2022: US$79 million) included in other payables. 9  All interest bearing liabilities, excluding lease liabilities, are unsecured. 10  Lease liabilities are measured in accordance with IFRS 16/AASB 16 \u2018Leases\u2019. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFairValueMeasurementExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-774": {
   "value": "Fair value measurement The carrying amount of financial assets and liabilities measured at fair value is principally calculated based on inputs other than quoted prices that are observable for these financial assets or liabilities, either directly (i.e. as unquoted prices) or indirectly (i.e. derived from prices). Where no price information is available from a quoted market source, alternative market mechanisms or recent comparable transactions, fair value is estimated based on the Group\u2019s views on relevant future prices, net of valuation allowances to accommodate liquidity, modelling and other risks implicit in such estimates. The inputs used in fair value calculations are determined by the relevant segment or function. The functions support the assets and operate under a defined set of accountabilities authorised by the Executive Leadership Team. Movements in the fair value of financial assets and liabilities may be recognised through the income statement or in other comprehensive income according to the designation of the underlying instrument.  For financial assets and liabilities carried at fair value, the Group uses the following to categorise the inputs to the valuation method used based on the lowest level input that is significant to the fair value measurement as a whole: IFRS 13 Fair value hierarchy Level 1 Level 2 Level 3 Valuation inputs Based on quoted prices (unadjusted) in active markets for identical financial assets and liabilities. Based on inputs other than quoted prices included within Level 1 that are observable for the financial asset or liability, either directly (i.e. as unquoted prices) or indirectly (i.e. derived from prices). Based on inputs not observable in the market using appropriate valuation models, including discounted cash flow modelling. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFairValueMeasurementExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-706": {
   "value": "24.3  Financial assets and liabilities The financial assets and liabilities are presented by class in the table below at their carrying amounts. IFRS 13  Fair value hierarchy Level 1 IFRS 9 Classification 2023  US$M 2022  US$M Current cross currency and interest rate swaps 2 2 Fair value through profit or loss 34  \u2212 Current other derivative contracts 3 2,3 Fair value through profit or loss 407 326 Current other financial assets Amortised cost  \u2212 100 Current other investments 4 1,2 Fair value through profit or loss 29 203 Non-current cross currency and interest rate swaps 2 2 Fair value through profit or loss 149 136 Non-current other derivative contracts 3 2,3 Fair value through profit or loss 228 16 Non-current other financial assets 5 3 Fair value through profit or loss 246 273 Non-current investment in shares 1,3 Fair value through other comprehensive income 224 138 Non-current other investments 4 1,2 Fair value through profit or loss 268 239 Total other financial assets 1,585 1,431 Cash and cash equivalents Amortised cost 12,428 17,236 Trade and other receivables 6 Amortised cost 1,506 1,674 Provisionally priced trade receivables 2 Fair value through profit or loss 2,705 3,478 Total financial assets 18,224 23,819 Non-financial assets 83,072 71,347 Total assets 101,296 95,166 Current cross currency and interest rate swaps 2 2 Fair value through profit or loss 147 358 Current other derivative contracts 2 Fair value through profit or loss 176 118 Current other financial liabilities 7 Amortised cost 79 103 Non-current cross currency and interest rate swaps 2 2 Fair value through profit or loss 1,608 1,466 Non-current other derivative contracts 3 2,3 Fair value through profit or loss 82 31 Non-current other financial liabilities 7 Amortised cost 467 500 Total other financial liabilities 2,559 2,576 Trade and other payables 8 Amortised cost 5,338 5,223 Provisionally priced trade payables 2 Fair value through profit or loss 841 1,385 Bank overdrafts and short-term borrowings 9 Amortised cost 5  \u2212 Bank loans 9 Amortised cost 7,502 2,472 Notes and debentures 9 Amortised cost 11,819 11,363 Lease liabilities 10 3,019 2,576 Other 9 Amortised cost  \u2212 17 Total financial liabilities 31,083 25,612 Non-financial liabilities 21,683 20,788 Total liabilities 52,766 46,400 1  All of the Group\u2019s financial assets and financial liabilities recognised at fair value were valued using market observable inputs categorised as Level 2 unless specified otherwise in the following footnotes. 2  Cross currency and interest rate swaps are valued using market data including interest rate curves and foreign exchange rates. A discounted cash flow approach is used to derive the fair value of cross currency and interest rate swaps at the reporting date. 3  Includes net other derivative assets of US$46 million related to power purchase contract agreements that are categorised as Level 3 (2022: US$ nil). 4  Includes investments held by BHP Foundation which are restricted and not available for general use by the Group of US$290 million (2022: US$252 million) of which other investments (mainly US Treasury Notes) of US$138 million categorised as Level 1 (2022: US$119 million). 5  Includes receivables contingent on outcome of future events relating to mining and regulatory approvals of US$246 million (2022: US$233 million). 6  Excludes input taxes of US$531 million (2022: US$427 million) included in other receivables. 7  Includes the discounted settlement liability in relation to the cancellation of power contracts at the Group\u2019s Escondida operations. 8  Excludes input taxes of US$121 million (2022: US$79 million) included in other payables. 9  All interest bearing liabilities, excluding lease liabilities, are unsecured. 10  Lease liabilities are measured in accordance with IFRS 16/AASB 16 \u2018Leases\u2019. The carrying amounts in the table above generally approximate to fair value. In the case of US$534 million (2022: US$3,018 million) of fixed rate debt not swapped to floating rate, the fair value at 30 June 2023 was US$538 million (2022: US$3,126 million). The fair value is determined using a method that can be categorised as Level 2 and uses inputs based on benchmark interest rates, alternative market mechanisms or recent comparable transactions. For financial instruments that are carried at fair value on a recurring basis, the Group determines whether transfers have occurred between levels in the fair value hierarchy by reassessing categorisation at the end of each reporting period. There were no transfers between categories during the period. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-725": {
   "value": "24.3  Financial assets and liabilities The financial assets and liabilities are presented by class in the table below at their carrying amounts. IFRS 13  Fair value hierarchy Level 1 IFRS 9 Classification 2023  US$M 2022  US$M Current cross currency and interest rate swaps 2 2 Fair value through profit or loss 34  \u2212 Current other derivative contracts 3 2,3 Fair value through profit or loss 407 326 Current other financial assets Amortised cost  \u2212 100 Current other investments 4 1,2 Fair value through profit or loss 29 203 Non-current cross currency and interest rate swaps 2 2 Fair value through profit or loss 149 136 Non-current other derivative contracts 3 2,3 Fair value through profit or loss 228 16 Non-current other financial assets 5 3 Fair value through profit or loss 246 273 Non-current investment in shares 1,3 Fair value through other comprehensive income 224 138 Non-current other investments 4 1,2 Fair value through profit or loss 268 239 Total other financial assets 1,585 1,431 Cash and cash equivalents Amortised cost 12,428 17,236 Trade and other receivables 6 Amortised cost 1,506 1,674 Provisionally priced trade receivables 2 Fair value through profit or loss 2,705 3,478 Total financial assets 18,224 23,819 Non-financial assets 83,072 71,347 Total assets 101,296 95,166 Current cross currency and interest rate swaps 2 2 Fair value through profit or loss 147 358 Current other derivative contracts 2 Fair value through profit or loss 176 118 Current other financial liabilities 7 Amortised cost 79 103 Non-current cross currency and interest rate swaps 2 2 Fair value through profit or loss 1,608 1,466 Non-current other derivative contracts 3 2,3 Fair value through profit or loss 82 31 Non-current other financial liabilities 7 Amortised cost 467 500 Total other financial liabilities 2,559 2,576 Trade and other payables 8 Amortised cost 5,338 5,223 Provisionally priced trade payables 2 Fair value through profit or loss 841 1,385 Bank overdrafts and short-term borrowings 9 Amortised cost 5  \u2212 Bank loans 9 Amortised cost 7,502 2,472 Notes and debentures 9 Amortised cost 11,819 11,363 Lease liabilities 10 3,019 2,576 Other 9 Amortised cost  \u2212 17 Total financial liabilities 31,083 25,612 Non-financial liabilities 21,683 20,788 Total liabilities 52,766 46,400 1  All of the Group\u2019s financial assets and financial liabilities recognised at fair value were valued using market observable inputs categorised as Level 2 unless specified otherwise in the following footnotes. 2  Cross currency and interest rate swaps are valued using market data including interest rate curves and foreign exchange rates. A discounted cash flow approach is used to derive the fair value of cross currency and interest rate swaps at the reporting date. 3  Includes net other derivative assets of US$46 million related to power purchase contract agreements that are categorised as Level 3 (2022: US$ nil). 4  Includes investments held by BHP Foundation which are restricted and not available for general use by the Group of US$290 million (2022: US$252 million) of which other investments (mainly US Treasury Notes) of US$138 million categorised as Level 1 (2022: US$119 million). 5  Includes receivables contingent on outcome of future events relating to mining and regulatory approvals of US$246 million (2022: US$233 million). 6  Excludes input taxes of US$531 million (2022: US$427 million) included in other receivables. 7  Includes the discounted settlement liability in relation to the cancellation of power contracts at the Group\u2019s Escondida operations. 8  Excludes input taxes of US$121 million (2022: US$79 million) included in other payables. 9  All interest bearing liabilities, excluding lease liabilities, are unsecured. 10  Lease liabilities are measured in accordance with IFRS 16/AASB 16 \u2018Leases\u2019. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFairValueMeasurementOfLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-721": {
   "value": "24.3  Financial assets and liabilities The financial assets and liabilities are presented by class in the table below at their carrying amounts. IFRS 13  Fair value hierarchy Level 1 IFRS 9 Classification 2023  US$M 2022  US$M Current cross currency and interest rate swaps 2 2 Fair value through profit or loss 34  \u2212 Current other derivative contracts 3 2,3 Fair value through profit or loss 407 326 Current other financial assets Amortised cost  \u2212 100 Current other investments 4 1,2 Fair value through profit or loss 29 203 Non-current cross currency and interest rate swaps 2 2 Fair value through profit or loss 149 136 Non-current other derivative contracts 3 2,3 Fair value through profit or loss 228 16 Non-current other financial assets 5 3 Fair value through profit or loss 246 273 Non-current investment in shares 1,3 Fair value through other comprehensive income 224 138 Non-current other investments 4 1,2 Fair value through profit or loss 268 239 Total other financial assets 1,585 1,431 Cash and cash equivalents Amortised cost 12,428 17,236 Trade and other receivables 6 Amortised cost 1,506 1,674 Provisionally priced trade receivables 2 Fair value through profit or loss 2,705 3,478 Total financial assets 18,224 23,819 Non-financial assets 83,072 71,347 Total assets 101,296 95,166 Current cross currency and interest rate swaps 2 2 Fair value through profit or loss 147 358 Current other derivative contracts 2 Fair value through profit or loss 176 118 Current other financial liabilities 7 Amortised cost 79 103 Non-current cross currency and interest rate swaps 2 2 Fair value through profit or loss 1,608 1,466 Non-current other derivative contracts 3 2,3 Fair value through profit or loss 82 31 Non-current other financial liabilities 7 Amortised cost 467 500 Total other financial liabilities 2,559 2,576 Trade and other payables 8 Amortised cost 5,338 5,223 Provisionally priced trade payables 2 Fair value through profit or loss 841 1,385 Bank overdrafts and short-term borrowings 9 Amortised cost 5  \u2212 Bank loans 9 Amortised cost 7,502 2,472 Notes and debentures 9 Amortised cost 11,819 11,363 Lease liabilities 10 3,019 2,576 Other 9 Amortised cost  \u2212 17 Total financial liabilities 31,083 25,612 Non-financial liabilities 21,683 20,788 Total liabilities 52,766 46,400 1  All of the Group\u2019s financial assets and financial liabilities recognised at fair value were valued using market observable inputs categorised as Level 2 unless specified otherwise in the following footnotes. 2  Cross currency and interest rate swaps are valued using market data including interest rate curves and foreign exchange rates. A discounted cash flow approach is used to derive the fair value of cross currency and interest rate swaps at the reporting date. 3  Includes net other derivative assets of US$46 million related to power purchase contract agreements that are categorised as Level 3 (2022: US$ nil). 4  Includes investments held by BHP Foundation which are restricted and not available for general use by the Group of US$290 million (2022: US$252 million) of which other investments (mainly US Treasury Notes) of US$138 million categorised as Level 1 (2022: US$119 million). 5  Includes receivables contingent on outcome of future events relating to mining and regulatory approvals of US$246 million (2022: US$233 million). 6  Excludes input taxes of US$531 million (2022: US$427 million) included in other receivables. 7  Includes the discounted settlement liability in relation to the cancellation of power contracts at the Group\u2019s Escondida operations. 8  Excludes input taxes of US$121 million (2022: US$79 million) included in other payables. 9  All interest bearing liabilities, excluding lease liabilities, are unsecured. 10  Lease liabilities are measured in accordance with IFRS 16/AASB 16 \u2018Leases\u2019. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFairValueMeasurementOfAssetsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-717": {
   "value": "24.3  Financial assets and liabilities The financial assets and liabilities are presented by class in the table below at their carrying amounts. IFRS 13  Fair value hierarchy Level 1 IFRS 9 Classification 2023  US$M 2022  US$M Current cross currency and interest rate swaps 2 2 Fair value through profit or loss 34  \u2212 Current other derivative contracts 3 2,3 Fair value through profit or loss 407 326 Current other financial assets Amortised cost  \u2212 100 Current other investments 4 1,2 Fair value through profit or loss 29 203 Non-current cross currency and interest rate swaps 2 2 Fair value through profit or loss 149 136 Non-current other derivative contracts 3 2,3 Fair value through profit or loss 228 16 Non-current other financial assets 5 3 Fair value through profit or loss 246 273 Non-current investment in shares 1,3 Fair value through other comprehensive income 224 138 Non-current other investments 4 1,2 Fair value through profit or loss 268 239 Total other financial assets 1,585 1,431 Cash and cash equivalents Amortised cost 12,428 17,236 Trade and other receivables 6 Amortised cost 1,506 1,674 Provisionally priced trade receivables 2 Fair value through profit or loss 2,705 3,478 Total financial assets 18,224 23,819 Non-financial assets 83,072 71,347 Total assets 101,296 95,166 Current cross currency and interest rate swaps 2 2 Fair value through profit or loss 147 358 Current other derivative contracts 2 Fair value through profit or loss 176 118 Current other financial liabilities 7 Amortised cost 79 103 Non-current cross currency and interest rate swaps 2 2 Fair value through profit or loss 1,608 1,466 Non-current other derivative contracts 3 2,3 Fair value through profit or loss 82 31 Non-current other financial liabilities 7 Amortised cost 467 500 Total other financial liabilities 2,559 2,576 Trade and other payables 8 Amortised cost 5,338 5,223 Provisionally priced trade payables 2 Fair value through profit or loss 841 1,385 Bank overdrafts and short-term borrowings 9 Amortised cost 5  \u2212 Bank loans 9 Amortised cost 7,502 2,472 Notes and debentures 9 Amortised cost 11,819 11,363 Lease liabilities 10 3,019 2,576 Other 9 Amortised cost  \u2212 17 Total financial liabilities 31,083 25,612 Non-financial liabilities 21,683 20,788 Total liabilities 52,766 46,400 1  All of the Group\u2019s financial assets and financial liabilities recognised at fair value were valued using market observable inputs categorised as Level 2 unless specified otherwise in the following footnotes. 2  Cross currency and interest rate swaps are valued using market data including interest rate curves and foreign exchange rates. A discounted cash flow approach is used to derive the fair value of cross currency and interest rate swaps at the reporting date. 3  Includes net other derivative assets of US$46 million related to power purchase contract agreements that are categorised as Level 3 (2022: US$ nil). 4  Includes investments held by BHP Foundation which are restricted and not available for general use by the Group of US$290 million (2022: US$252 million) of which other investments (mainly US Treasury Notes) of US$138 million categorised as Level 1 (2022: US$119 million). 5  Includes receivables contingent on outcome of future events relating to mining and regulatory approvals of US$246 million (2022: US$233 million). 6  Excludes input taxes of US$531 million (2022: US$427 million) included in other receivables. 7  Includes the discounted settlement liability in relation to the cancellation of power contracts at the Group\u2019s Escondida operations. 8  Excludes input taxes of US$121 million (2022: US$79 million) included in other payables. 9  All interest bearing liabilities, excluding lease liabilities, are unsecured. 10  Lease liabilities are measured in accordance with IFRS 16/AASB 16 \u2018Leases\u2019. The carrying amounts in the table above generally approximate to fair value. In the case of US$534 million (2022: US$3,018 million) of fixed rate debt not swapped to floating rate, the fair value at 30 June 2023 was US$538 million (2022: US$3,126 million). The fair value is determined using a method that can be categorised as Level 2 and uses inputs based on benchmark interest rates, alternative market mechanisms or recent comparable transactions. For financial instruments that are carried at fair value on a recurring basis, the Group determines whether transfers have occurred between levels in the fair value hierarchy by reassessing categorisation at the end of each reporting period. There were no transfers between categories during the period. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialAssetsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-682": {
   "value": "Offsetting financial assets and liabilities The Group enters into money market deposits and derivative transactions under International Swaps and Derivatives Association master netting agreements that do not meet the offsetting criteria in IAS 32/AASB 132 \u2018Financial Instruments: Presentation\u2019, but allow for the related amounts to be set- off in certain circumstances. The amounts set out as cross currency and interest rate swaps in the table above represent the derivative financial assets and liabilities of the Group that may be subject to the above arrangements and are presented on a gross basis. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOffsettingOfFinancialAssetsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-707": {
   "value": "24.4  Derivatives and hedge accounting The Group uses derivatives to hedge its exposure to certain market risks and may elect to apply hedge accounting. Hedge accounting Derivatives are included within financial assets or liabilities at fair value through profit or loss unless they are designated as effective hedging instruments. Financial instruments in this category are classified as current if they are due or expected to be settled within 12 months otherwise they are classified as non-current. Where hedge accounting is applied, at the start of the transaction, the Group documents the type of hedge, the relationship between the hedging instrument and hedged items and its risk management objective and strategy for undertaking various hedge transactions. The documentation also demonstrates that the hedge is expected to be effective. The Group applies the following types of hedge accounting to its derivatives hedging the interest rate and currency risks of its notes and debentures: \u2013  Fair value hedges \u2013 the fair value gain or loss on interest rate and cross currency swaps relating to interest rate risk, together with the change in the fair value of the hedged fixed rate borrowings attributable to interest rate risk are recognised immediately in the income statement. If the hedge no longer meets the criteria for hedge accounting, the fair value adjustment on the note or debenture is amortised to the income statement over the period to maturity using a recalculated effective interest rate. \u2013  Cash flow hedges \u2013 changes in the fair value of cross currency interest rate swaps which hedge foreign currency cash flows on the notes and debentures are recognised directly in other comprehensive income and accumulated in the cash flow hedging reserve. To the extent a hedge is ineffective, changes in fair value are recognised immediately in the income statement. When a hedging instrument expires, or is sold, terminated or exercised, or when a hedge no longer meets the criteria for hedge accounting, any cumulative gain or loss existing in equity at that time remains in equity and is amortised to the income statement over the period to the hedged item\u2019s maturity. When hedged, the Group hedges the full notional value of notes or debentures. However, certain components of the fair value of derivatives are not permitted under IFRS 9 to be included in the hedge accounting above. Certain costs of hedging are permitted to be recognised in other comprehensive income. Any change in the fair value of a derivative that does not qualify for hedge accounting, or is ineffective in hedging the designated risk due to contractual differences between the hedged item and hedging instrument, is recognised immediately in the income statement. The table below shows the carrying amounts of the Group\u2019s notes and debentures by currency and the derivatives which hedge them: \u2013  The carrying amount of the notes and debentures includes foreign exchange remeasurement to period-end rates and fair value adjustments when included in a fair value hedge. \u2013  The breakdown of the hedging derivatives includes remeasurement of foreign currency notional values at period-end rates, fair value movements due to interest rate risk, foreign currency cash flows designated into cash flow hedges, costs of hedging recognised in other comprehensive income, ineffectiveness recognised in the income statement and accruals or prepayments. \u2013  The hedged value of notes and debentures includes their carrying amounts adjusted for the offsetting derivative fair value movements due to foreign currency and interest rate risk remeasurement. 2023  US$M Carrying amount of notes and debentures Fair value of derivatives Hedged value of notes and debentures 2 Foreign exchange notional at spot rates Interest  rate risk Recognised in cash flow hedging reserve Recognised  in cost of hedging reserve Recognised in  the income statement 1 Accrued  cash flows Total A B C D E F G B to G A + B + C USD 7,245  \u2212 214  \u2212  \u2212 32 23 269 7,459 GBP 1,566 522 274 24 (9) (69) 35 777 2,362 EUR 3,008 434 302 (39) 10 (49) (132) 526 3,744 Total 11,819 956 790 (15) 1 (86) (74) 1,572 13,565 2022  US$M Carrying  amount of  notes and debentures Fair value of derivatives Hedged value  of notes and debentures 2 Foreign exchange notional at  spot rates Interest  rate risk Recognised in cash flow hedging  reserve Recognised  in cost of hedging  reserve Recognised in  the income statement 1 Accrued  cash flows Total A B C D E F G B to G A + B + C USD 4,740  \u2212 (16)  \u2212  \u2212 (7) 86 63 4,724 GBP 2,599 796 (115) (35) 13 26 42 727 3,280 EUR 3,449 585 112 (16) 8 (4) 45 730 4,146 CAD 575 167 5 (8) 6 (3) 1 168 747 Total 11,363 1,548 (14) (59) 27 12 174 1,688 12,897 1  Predominantly related to ineffectiveness. 2  Includes US$534 million (2022: US$3,018 million) of fixed rate debt not swapped to floating rate that is not in a hedging relationship. The weighted average interest rate payable is USD SOFR +1.54 per cent (2022: USD LIBOR + 1.74 per cent). Refer to note 23 \u2018Net finance costs\u2019 for details of net finance costs for the year. Movements in reserves relating to hedge accounting The following table shows a reconciliation of the components of equity and an analysis of the movements in reserves for all hedges. For a description of these reserves, refer to note 18 \u2018Other equity\u2019. 2023  US$M Cash flow hedging reserve  Cost of hedging reserve Gross Tax Net Gross Tax Net Total At the beginning of the financial year 59 (18) 41 (27) 8 (19) 22 Add: Change in fair value of hedging instrument recognised in OCI 95 (29) 66  \u2212  \u2212  \u2212 66 Less: Reclassified from reserves to financial expenses \u2013 recognised through OCI (174) 53 (121) 26 (8) 18 (103) Less: Loss/(gain) transferred to balance sheet related items 35 (11) 24  \u2212  \u2212  \u2212 24 At the end of the financial year 15 (5) 10 (1)  \u2212 (1) 9 2022  US$M Cash flow hedging reserve  Cost of hedging reserve Gross Tax Net Gross Ta x Net Total At the beginning of the financial year 142 (42) 100 (77) 23 (54) 46 Add: Change in fair value of hedging instrument recognised in OCI (914) 274 (640)  \u2212  \u2212  \u2212 (640) Less: Reclassified from reserves to financial expenses \u2013 recognised through OCI 831 (250) 581 50 (15) 35 616 At the end of the financial year 59 (18) 41 (27) 8 (19) 22 Changes in interest bearing liabilities and related derivatives resulting from financing activities The movement in the year in the Group\u2019s interest bearing liabilities and related derivatives are as follows: 2023  US$M Interest bearing liabilities Derivatives liabilities/ (assets) Bank loans Notes and debentures Lease liabilities Bank overdraft and short-term borrowings Other Cross currency and interest rate swaps  Total At the beginning of the financial year 2,472 11,363 2,576  \u2212 17 1,688 Proceeds from interest bearing liabilities 5,450 2,732  \u2212  \u2212  \u2212  \u2212 8,182 Settlements of debt related instruments  \u2212  \u2212  \u2212  \u2212  \u2212 (677) (677) Repayment of interest bearing liabilities (1,087) (1,610) (576)  \u2212 (16)  \u2212 (3,289) Change from Net financing cash flows 4,363 1,122 (576)  \u2212 (16) (677) 4,216 Other movements: Acquisition of subsidiaries and operations 688  \u2212 423  \u2212  \u2212  \u2212 Interest rate impacts  \u2212 (803)  \u2212  \u2212  \u2212 691 Foreign exchange impacts  (23) 128 12  \u2212  \u2212 (127) Lease additions  \u2212  \u2212 542  \u2212  \u2212  \u2212 Remeasurement of index-linked freight contracts  \u2212  \u2212 53  \u2212  \u2212  \u2212 Other interest bearing liabilities/derivative related changes 2 9 (11) 5 (1) (3) At the end of the financial year 7,502 11,819 3,019 5  \u2212 1,572 2022  US$M Interest bearing liabilities Derivatives (assets)/ liabilities Bank loans Notes and debentures Lease liabilities Bank overdraft and short-term borrowings Other Cross currency and interest rate swaps  Total At the beginning of the financial year 2,260 14,769 3,896  \u2212 58 (557) Proceeds from interest bearing liabilities 1,150  \u2212  \u2212  \u2212 14  \u2212 1,164 Settlements of debt related instruments  \u2212  \u2212  \u2212  \u2212  \u2212  \u2212  \u2212 Repayment of interest bearing liabilities 1 (941) (1,232) (1,163)  \u2212 (55)  \u2212 (3,391) Change from Net financing cash flows 209 (1,232) (1,163)  \u2212 (41)  \u2212 (2,227) Other movements: Divestment and demerger of subsidiaries and operations  \u2212  \u2212 (492)  \u2212  \u2212  \u2212 Interest rate impacts  \u2212 (1,286)  \u2212  \u2212  \u2212 1,277 Foreign exchange impacts  3 (894) (126)  \u2212 (2) 898 Lease additions  \u2212  \u2212 866  \u2212  \u2212  \u2212 Remeasurement of index-linked freight contracts  \u2212  \u2212 (369)  \u2212  \u2212  \u2212 Other interest bearing liabilities/derivative related changes  \u2212 6 (36)  \u2212 2 70 At the end of the financial year 2,472 11,363 2,576  \u2212 17 1,688 1  FY2022 includes US$33 million of Discontinued operations cash flows. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfHedgeAccountingExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-775": {
   "value": "24.4  Derivatives and hedge accounting The Group uses derivatives to hedge its exposure to certain market risks and may elect to apply hedge accounting. Hedge accounting Derivatives are included within financial assets or liabilities at fair value through profit or loss unless they are designated as effective hedging instruments. Financial instruments in this category are classified as current if they are due or expected to be settled within 12 months otherwise they are classified as non-current. Where hedge accounting is applied, at the start of the transaction, the Group documents the type of hedge, the relationship between the hedging instrument and hedged items and its risk management objective and strategy for undertaking various hedge transactions. The documentation also demonstrates that the hedge is expected to be effective. The Group applies the following types of hedge accounting to its derivatives hedging the interest rate and currency risks of its notes and debentures: \u2013  Fair value hedges \u2013 the fair value gain or loss on interest rate and cross currency swaps relating to interest rate risk, together with the change in the fair value of the hedged fixed rate borrowings attributable to interest rate risk are recognised immediately in the income statement. If the hedge no longer meets the criteria for hedge accounting, the fair value adjustment on the note or debenture is amortised to the income statement over the period to maturity using a recalculated effective interest rate. \u2013  Cash flow hedges \u2013 changes in the fair value of cross currency interest rate swaps which hedge foreign currency cash flows on the notes and debentures are recognised directly in other comprehensive income and accumulated in the cash flow hedging reserve. To the extent a hedge is ineffective, changes in fair value are recognised immediately in the income statement. When a hedging instrument expires, or is sold, terminated or exercised, or when a hedge no longer meets the criteria for hedge accounting, any cumulative gain or loss existing in equity at that time remains in equity and is amortised to the income statement over the period to the hedged item\u2019s maturity. When hedged, the Group hedges the full notional value of notes or debentures. However, certain components of the fair value of derivatives are not permitted under IFRS 9 to be included in the hedge accounting above. Certain costs of hedging are permitted to be recognised in other comprehensive income. Any change in the fair value of a derivative that does not qualify for hedge accounting, or is ineffective in hedging the designated risk due to contractual differences between the hedged item and hedging instrument, is recognised immediately in the income statement. The table below shows the carrying amounts of the Group\u2019s notes and debentures by currency and the derivatives which hedge them: \u2013  The carrying amount of the notes and debentures includes foreign exchange remeasurement to period-end rates and fair value adjustments when included in a fair value hedge. \u2013  The breakdown of the hedging derivatives includes remeasurement of foreign currency notional values at period-end rates, fair value movements due to interest rate risk, foreign currency cash flows designated into cash flow hedges, costs of hedging recognised in other comprehensive income, ineffectiveness recognised in the income statement and accruals or prepayments. \u2013  The hedged value of notes and debentures includes their carrying amounts adjusted for the offsetting derivative fair value movements due to foreign currency and interest rate risk remeasurement. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForHedgingExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-769": {
   "value": "24.4  Derivatives and hedge accounting The Group uses derivatives to hedge its exposure to certain market risks and may elect to apply hedge accounting. Hedge accounting Derivatives are included within financial assets or liabilities at fair value through profit or loss unless they are designated as effective hedging instruments. Financial instruments in this category are classified as current if they are due or expected to be settled within 12 months otherwise they are classified as non-current. Where hedge accounting is applied, at the start of the transaction, the Group documents the type of hedge, the relationship between the hedging instrument and hedged items and its risk management objective and strategy for undertaking various hedge transactions. The documentation also demonstrates that the hedge is expected to be effective. The Group applies the following types of hedge accounting to its derivatives hedging the interest rate and currency risks of its notes and debentures: \u2013  Fair value hedges \u2013 the fair value gain or loss on interest rate and cross currency swaps relating to interest rate risk, together with the change in the fair value of the hedged fixed rate borrowings attributable to interest rate risk are recognised immediately in the income statement. If the hedge no longer meets the criteria for hedge accounting, the fair value adjustment on the note or debenture is amortised to the income statement over the period to maturity using a recalculated effective interest rate. \u2013  Cash flow hedges \u2013 changes in the fair value of cross currency interest rate swaps which hedge foreign currency cash flows on the notes and debentures are recognised directly in other comprehensive income and accumulated in the cash flow hedging reserve. To the extent a hedge is ineffective, changes in fair value are recognised immediately in the income statement. When a hedging instrument expires, or is sold, terminated or exercised, or when a hedge no longer meets the criteria for hedge accounting, any cumulative gain or loss existing in equity at that time remains in equity and is amortised to the income statement over the period to the hedged item\u2019s maturity. When hedged, the Group hedges the full notional value of notes or debentures. However, certain components of the fair value of derivatives are not permitted under IFRS 9 to be included in the hedge accounting above. Certain costs of hedging are permitted to be recognised in other comprehensive income. Any change in the fair value of a derivative that does not qualify for hedge accounting, or is ineffective in hedging the designated risk due to contractual differences between the hedged item and hedging instrument, is recognised immediately in the income statement. The table below shows the carrying amounts of the Group\u2019s notes and debentures by currency and the derivatives which hedge them: \u2013  The carrying amount of the notes and debentures includes foreign exchange remeasurement to period-end rates and fair value adjustments when included in a fair value hedge. \u2013  The breakdown of the hedging derivatives includes remeasurement of foreign currency notional values at period-end rates, fair value movements due to interest rate risk, foreign currency cash flows designated into cash flow hedges, costs of hedging recognised in other comprehensive income, ineffectiveness recognised in the income statement and accruals or prepayments. \u2013  The hedged value of notes and debentures includes their carrying amounts adjusted for the offsetting derivative fair value movements due to foreign currency and interest rate risk remeasurement. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDerivativeFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-750": {
   "value": "24.4  Derivatives and hedge accounting The Group uses derivatives to hedge its exposure to certain market risks and may elect to apply hedge accounting. Hedge accounting Derivatives are included within financial assets or liabilities at fair value through profit or loss unless they are designated as effective hedging instruments. Financial instruments in this category are classified as current if they are due or expected to be settled within 12 months otherwise they are classified as non-current. Where hedge accounting is applied, at the start of the transaction, the Group documents the type of hedge, the relationship between the hedging instrument and hedged items and its risk management objective and strategy for undertaking various hedge transactions. The documentation also demonstrates that the hedge is expected to be effective. The Group applies the following types of hedge accounting to its derivatives hedging the interest rate and currency risks of its notes and debentures: \u2013  Fair value hedges \u2013 the fair value gain or loss on interest rate and cross currency swaps relating to interest rate risk, together with the change in the fair value of the hedged fixed rate borrowings attributable to interest rate risk are recognised immediately in the income statement. If the hedge no longer meets the criteria for hedge accounting, the fair value adjustment on the note or debenture is amortised to the income statement over the period to maturity using a recalculated effective interest rate. \u2013  Cash flow hedges \u2013 changes in the fair value of cross currency interest rate swaps which hedge foreign currency cash flows on the notes and debentures are recognised directly in other comprehensive income and accumulated in the cash flow hedging reserve. To the extent a hedge is ineffective, changes in fair value are recognised immediately in the income statement. When a hedging instrument expires, or is sold, terminated or exercised, or when a hedge no longer meets the criteria for hedge accounting, any cumulative gain or loss existing in equity at that time remains in equity and is amortised to the income statement over the period to the hedged item\u2019s maturity. When hedged, the Group hedges the full notional value of notes or debentures. However, certain components of the fair value of derivatives are not permitted under IFRS 9 to be included in the hedge accounting above. Certain costs of hedging are permitted to be recognised in other comprehensive income. Any change in the fair value of a derivative that does not qualify for hedge accounting, or is ineffective in hedging the designated risk due to contractual differences between the hedged item and hedging instrument, is recognised immediately in the income statement. The table below shows the carrying amounts of the Group\u2019s notes and debentures by currency and the derivatives which hedge them: \u2013  The carrying amount of the notes and debentures includes foreign exchange remeasurement to period-end rates and fair value adjustments when included in a fair value hedge. \u2013  The breakdown of the hedging derivatives includes remeasurement of foreign currency notional values at period-end rates, fair value movements due to interest rate risk, foreign currency cash flows designated into cash flow hedges, costs of hedging recognised in other comprehensive income, ineffectiveness recognised in the income statement and accruals or prepayments. \u2013  The hedged value of notes and debentures includes their carrying amounts adjusted for the offsetting derivative fair value movements due to foreign currency and interest rate risk remeasurement. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDerivativeFinancialInstrumentsAndHedgingExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-681": {
   "value": "24.4  Derivatives and hedge accounting The Group uses derivatives to hedge its exposure to certain market risks and may elect to apply hedge accounting. Hedge accounting Derivatives are included within financial assets or liabilities at fair value through profit or loss unless they are designated as effective hedging instruments. Financial instruments in this category are classified as current if they are due or expected to be settled within 12 months otherwise they are classified as non-current. Where hedge accounting is applied, at the start of the transaction, the Group documents the type of hedge, the relationship between the hedging instrument and hedged items and its risk management objective and strategy for undertaking various hedge transactions. The documentation also demonstrates that the hedge is expected to be effective. The Group applies the following types of hedge accounting to its derivatives hedging the interest rate and currency risks of its notes and debentures: \u2013  Fair value hedges \u2013 the fair value gain or loss on interest rate and cross currency swaps relating to interest rate risk, together with the change in the fair value of the hedged fixed rate borrowings attributable to interest rate risk are recognised immediately in the income statement. If the hedge no longer meets the criteria for hedge accounting, the fair value adjustment on the note or debenture is amortised to the income statement over the period to maturity using a recalculated effective interest rate. \u2013  Cash flow hedges \u2013 changes in the fair value of cross currency interest rate swaps which hedge foreign currency cash flows on the notes and debentures are recognised directly in other comprehensive income and accumulated in the cash flow hedging reserve. To the extent a hedge is ineffective, changes in fair value are recognised immediately in the income statement. When a hedging instrument expires, or is sold, terminated or exercised, or when a hedge no longer meets the criteria for hedge accounting, any cumulative gain or loss existing in equity at that time remains in equity and is amortised to the income statement over the period to the hedged item\u2019s maturity. When hedged, the Group hedges the full notional value of notes or debentures. However, certain components of the fair value of derivatives are not permitted under IFRS 9 to be included in the hedge accounting above. Certain costs of hedging are permitted to be recognised in other comprehensive income. Any change in the fair value of a derivative that does not qualify for hedge accounting, or is ineffective in hedging the designated risk due to contractual differences between the hedged item and hedging instrument, is recognised immediately in the income statement. The table below shows the carrying amounts of the Group\u2019s notes and debentures by currency and the derivatives which hedge them: \u2013  The carrying amount of the notes and debentures includes foreign exchange remeasurement to period-end rates and fair value adjustments when included in a fair value hedge. \u2013  The breakdown of the hedging derivatives includes remeasurement of foreign currency notional values at period-end rates, fair value movements due to interest rate risk, foreign currency cash flows designated into cash flow hedges, costs of hedging recognised in other comprehensive income, ineffectiveness recognised in the income statement and accruals or prepayments. \u2013  The hedged value of notes and debentures includes their carrying amounts adjusted for the offsetting derivative fair value movements due to foreign currency and interest rate risk remeasurement. 2023  US$M Carrying amount of notes and debentures Fair value of derivatives Hedged value of notes and debentures 2 Foreign exchange notional at spot rates Interest  rate risk Recognised in cash flow hedging reserve Recognised  in cost of hedging reserve Recognised in  the income statement 1 Accrued  cash flows Total A B C D E F G B to G A + B + C USD 7,245  \u2212 214  \u2212  \u2212 32 23 269 7,459 GBP 1,566 522 274 24 (9) (69) 35 777 2,362 EUR 3,008 434 302 (39) 10 (49) (132) 526 3,744 Total 11,819 956 790 (15) 1 (86) (74) 1,572 13,565 2022  US$M Carrying  amount of  notes and debentures Fair value of derivatives Hedged value  of notes and debentures 2 Foreign exchange notional at  spot rates Interest  rate risk Recognised in cash flow hedging  reserve Recognised  in cost of hedging  reserve Recognised in  the income statement 1 Accrued  cash flows Total A B C D E F G B to G A + B + C USD 4,740  \u2212 (16)  \u2212  \u2212 (7) 86 63 4,724 GBP 2,599 796 (115) (35) 13 26 42 727 3,280 EUR 3,449 585 112 (16) 8 (4) 45 730 4,146 CAD 575 167 5 (8) 6 (3) 1 168 747 Total 11,363 1,548 (14) (59) 27 12 174 1,688 12,897 1  Predominantly related to ineffectiveness. 2  Includes US$534 million (2022: US$3,018 million) of fixed rate debt not swapped to floating rate that is not in a hedging relationship. The weighted average interest rate payable is USD SOFR +1.54 per cent (2022: USD LIBOR + 1.74 per cent). Refer to note 23 \u2018Net finance costs\u2019 for details of net finance costs for the year. Movements in reserves relating to hedge accounting The following table shows a reconciliation of the components of equity and an analysis of the movements in reserves for all hedges. For a description of these reserves, refer to note 18 \u2018Other equity\u2019. 2023  US$M Cash flow hedging reserve  Cost of hedging reserve Gross Tax Net Gross Tax Net Total At the beginning of the financial year 59 (18) 41 (27) 8 (19) 22 Add: Change in fair value of hedging instrument recognised in OCI 95 (29) 66  \u2212  \u2212  \u2212 66 Less: Reclassified from reserves to financial expenses \u2013 recognised through OCI (174) 53 (121) 26 (8) 18 (103) Less: Loss/(gain) transferred to balance sheet related items 35 (11) 24  \u2212  \u2212  \u2212 24 At the end of the financial year 15 (5) 10 (1)  \u2212 (1) 9 2022  US$M Cash flow hedging reserve  Cost of hedging reserve Gross Tax Net Gross Ta x Net Total At the beginning of the financial year 142 (42) 100 (77) 23 (54) 46 Add: Change in fair value of hedging instrument recognised in OCI (914) 274 (640)  \u2212  \u2212  \u2212 (640) Less: Reclassified from reserves to financial expenses \u2013 recognised through OCI 831 (250) 581 50 (15) 35 616 At the end of the financial year 59 (18) 41 (27) 8 (19) 22 Changes in interest bearing liabilities and related derivatives resulting from financing activities The movement in the year in the Group\u2019s interest bearing liabilities and related derivatives are as follows: 2023  US$M Interest bearing liabilities Derivatives liabilities/ (assets) Bank loans Notes and debentures Lease liabilities Bank overdraft and short-term borrowings Other Cross currency and interest rate swaps  Total At the beginning of the financial year 2,472 11,363 2,576  \u2212 17 1,688 Proceeds from interest bearing liabilities 5,450 2,732  \u2212  \u2212  \u2212  \u2212 8,182 Settlements of debt related instruments  \u2212  \u2212  \u2212  \u2212  \u2212 (677) (677) Repayment of interest bearing liabilities (1,087) (1,610) (576)  \u2212 (16)  \u2212 (3,289) Change from Net financing cash flows 4,363 1,122 (576)  \u2212 (16) (677) 4,216 Other movements: Acquisition of subsidiaries and operations 688  \u2212 423  \u2212  \u2212  \u2212 Interest rate impacts  \u2212 (803)  \u2212  \u2212  \u2212 691 Foreign exchange impacts  (23) 128 12  \u2212  \u2212 (127) Lease additions  \u2212  \u2212 542  \u2212  \u2212  \u2212 Remeasurement of index-linked freight contracts  \u2212  \u2212 53  \u2212  \u2212  \u2212 Other interest bearing liabilities/derivative related changes 2 9 (11) 5 (1) (3) At the end of the financial year 7,502 11,819 3,019 5  \u2212 1,572 2022  US$M Interest bearing liabilities Derivatives (assets)/ liabilities Bank loans Notes and debentures Lease liabilities Bank overdraft and short-term borrowings Other Cross currency and interest rate swaps  Total At the beginning of the financial year 2,260 14,769 3,896  \u2212 58 (557) Proceeds from interest bearing liabilities 1,150  \u2212  \u2212  \u2212 14  \u2212 1,164 Settlements of debt related instruments  \u2212  \u2212  \u2212  \u2212  \u2212  \u2212  \u2212 Repayment of interest bearing liabilities 1 (941) (1,232) (1,163)  \u2212 (55)  \u2212 (3,391) Change from Net financing cash flows 209 (1,232) (1,163)  \u2212 (41)  \u2212 (2,227) Other movements: Divestment and demerger of subsidiaries and operations  \u2212  \u2212 (492)  \u2212  \u2212  \u2212 Interest rate impacts  \u2212 (1,286)  \u2212  \u2212  \u2212 1,277 Foreign exchange impacts  3 (894) (126)  \u2212 (2) 898 Lease additions  \u2212  \u2212 866  \u2212  \u2212  \u2212 Remeasurement of index-linked freight contracts  \u2212  \u2212 (369)  \u2212  \u2212  \u2212 Other interest bearing liabilities/derivative related changes  \u2212 6 (36)  \u2212 2 70 At the end of the financial year 2,472 11,363 2,576  \u2212 17 1,688 1  FY2022 includes US$33 million of Discontinued operations cash flows. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDerivativeFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-726": {
   "value": "2023  US$M Carrying amount of notes and debentures Fair value of derivatives Hedged value of notes and debentures 2 Foreign exchange notional at spot rates Interest  rate risk Recognised in cash flow hedging reserve Recognised  in cost of hedging reserve Recognised in  the income statement 1 Accrued  cash flows Total A B C D E F G B to G A + B + C USD 7,245  \u2212 214  \u2212  \u2212 32 23 269 7,459 GBP 1,566 522 274 24 (9) (69) 35 777 2,362 EUR 3,008 434 302 (39) 10 (49) (132) 526 3,744 Total 11,819 956 790 (15) 1 (86) (74) 1,572 13,565 2022  US$M Carrying  amount of  notes and debentures Fair value of derivatives Hedged value  of notes and debentures 2 Foreign exchange notional at  spot rates Interest  rate risk Recognised in cash flow hedging  reserve Recognised  in cost of hedging  reserve Recognised in  the income statement 1 Accrued  cash flows Total A B C D E F G B to G A + B + C USD 4,740  \u2212 (16)  \u2212  \u2212 (7) 86 63 4,724 GBP 2,599 796 (115) (35) 13 26 42 727 3,280 EUR 3,449 585 112 (16) 8 (4) 45 730 4,146 CAD 575 167 5 (8) 6 (3) 1 168 747 Total 11,363 1,548 (14) (59) 27 12 174 1,688 12,897 1  Predominantly related to ineffectiveness. 2  Includes US$534 million (2022: US$3,018 million) of fixed rate debt not swapped to floating rate that is not in a hedging relationship. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFairValueOfFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-722": {
   "value": "2023  US$M Carrying amount of notes and debentures Fair value of derivatives Hedged value of notes and debentures 2 Foreign exchange notional at spot rates Interest  rate risk Recognised in cash flow hedging reserve Recognised  in cost of hedging reserve Recognised in  the income statement 1 Accrued  cash flows Total A B C D E F G B to G A + B + C USD 7,245  \u2212 214  \u2212  \u2212 32 23 269 7,459 GBP 1,566 522 274 24 (9) (69) 35 777 2,362 EUR 3,008 434 302 (39) 10 (49) (132) 526 3,744 Total 11,819 956 790 (15) 1 (86) (74) 1,572 13,565 2022  US$M Carrying  amount of  notes and debentures Fair value of derivatives Hedged value  of notes and debentures 2 Foreign exchange notional at  spot rates Interest  rate risk Recognised in cash flow hedging  reserve Recognised  in cost of hedging  reserve Recognised in  the income statement 1 Accrued  cash flows Total A B C D E F G B to G A + B + C USD 4,740  \u2212 (16)  \u2212  \u2212 (7) 86 63 4,724 GBP 2,599 796 (115) (35) 13 26 42 727 3,280 EUR 3,449 585 112 (16) 8 (4) 45 730 4,146 CAD 575 167 5 (8) 6 (3) 1 168 747 Total 11,363 1,548 (14) (59) 27 12 174 1,688 12,897 1  Predominantly related to ineffectiveness. 2  Includes US$534 million (2022: US$3,018 million) of fixed rate debt not swapped to floating rate that is not in a hedging relationship. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDetailedInformationAboutHedgingInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-718": {
   "value": "Fair value of derivatives Hedged value of notes and debentures 2 Foreign exchange notional at spot rates Interest  rate risk Recognised in cash flow hedging reserve Recognised  in cost of hedging reserve Recognised in  the income statement 1 Accrued  cash flows Total A B C D E F G B to G A + B + C USD 7,245  \u2212 214  \u2212  \u2212 32 23 269 7,459 GBP 1,566 522 274 24 (9) (69) 35 777 2,362 EUR 3,008 434 302 (39) 10 (49) (132) 526 3,744 Total 11,819 956 790 (15) 1 (86) (74) 1,572 13,565 2022  US$M Carrying  amount of  notes and debentures Fair value of derivatives Hedged value  of notes and debentures 2 Foreign exchange notional at  spot rates Interest  rate risk Recognised in cash flow hedging  reserve Recognised  in cost of hedging  reserve Recognised in  the income statement 1 Accrued  cash flows Total A B C D E F G B to G A + B + C USD 4,740  \u2212 (16)  \u2212  \u2212 (7) 86 63 4,724 GBP 2,599 796 (115) (35) 13 26 42 727 3,280 EUR 3,449 585 112 (16) 8 (4) 45 730 4,146 CAD 575 167 5 (8) 6 (3) 1 168 747 Total 11,363 1,548 (14) (59) 27 12 174 1,688 12,897 1  Predominantly related to ineffectiveness. 2  Includes US$534 million (2022: US$3,018 million) of fixed rate debt not swapped to floating rate that is not in a hedging relationship. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDetailedInformationAboutHedgedItemsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-719": {
   "value": "Movements in reserves relating to hedge accounting The following table shows a reconciliation of the components of equity and an analysis of the movements in reserves for all hedges. For a description of these reserves, refer to note 18 \u2018Other equity\u2019. 2023  US$M Cash flow hedging reserve  Cost of hedging reserve Gross Tax Net Gross Tax Net Total At the beginning of the financial year 59 (18) 41 (27) 8 (19) 22 Add: Change in fair value of hedging instrument recognised in OCI 95 (29) 66  \u2212  \u2212  \u2212 66 Less: Reclassified from reserves to financial expenses \u2013 recognised through OCI (174) 53 (121) 26 (8) 18 (103) Less: Loss/(gain) transferred to balance sheet related items 35 (11) 24  \u2212  \u2212  \u2212 24 At the end of the financial year 15 (5) 10 (1)  \u2212 (1) 9 2022  US$M Cash flow hedging reserve  Cost of hedging reserve Gross Tax Net Gross Ta x Net Total At the beginning of the financial year 142 (42) 100 (77) 23 (54) 46 Add: Change in fair value of hedging instrument recognised in OCI (914) 274 (640)  \u2212  \u2212  \u2212 (640) Less: Reclassified from reserves to financial expenses \u2013 recognised through OCI 831 (250) 581 50 (15) 35 616 At the end of the financial year 59 (18) 41 (27) 8 (19) 22 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInformationAboutAmountsThatAffectedStatementOfComprehensiveIncomeAsResultOfHedgeAccountingExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-723": {
   "value": "Changes in interest bearing liabilities and related derivatives resulting from financing activities The movement in the year in the Group\u2019s interest bearing liabilities and related derivatives are as follows: 2023  US$M Interest bearing liabilities Derivatives liabilities/ (assets) Bank loans Notes and debentures Lease liabilities Bank overdraft and short-term borrowings Other Cross currency and interest rate swaps  Total At the beginning of the financial year 2,472 11,363 2,576  \u2212 17 1,688 Proceeds from interest bearing liabilities 5,450 2,732  \u2212  \u2212  \u2212  \u2212 8,182 Settlements of debt related instruments  \u2212  \u2212  \u2212  \u2212  \u2212 (677) (677) Repayment of interest bearing liabilities (1,087) (1,610) (576)  \u2212 (16)  \u2212 (3,289) Change from Net financing cash flows 4,363 1,122 (576)  \u2212 (16) (677) 4,216 Other movements: Acquisition of subsidiaries and operations 688  \u2212 423  \u2212  \u2212  \u2212 Interest rate impacts  \u2212 (803)  \u2212  \u2212  \u2212 691 Foreign exchange impacts  (23) 128 12  \u2212  \u2212 (127) Lease additions  \u2212  \u2212 542  \u2212  \u2212  \u2212 Remeasurement of index-linked freight contracts  \u2212  \u2212 53  \u2212  \u2212  \u2212 Other interest bearing liabilities/derivative related changes 2 9 (11) 5 (1) (3) At the end of the financial year 7,502 11,819 3,019 5  \u2212 1,572 2022  US$M Interest bearing liabilities Derivatives (assets)/ liabilities Bank loans Notes and debentures Lease liabilities Bank overdraft and short-term borrowings Other Cross currency and interest rate swaps  Total At the beginning of the financial year 2,260 14,769 3,896  \u2212 58 (557) Proceeds from interest bearing liabilities 1,150  \u2212  \u2212  \u2212 14  \u2212 1,164 Settlements of debt related instruments  \u2212  \u2212  \u2212  \u2212  \u2212  \u2212  \u2212 Repayment of interest bearing liabilities 1 (941) (1,232) (1,163)  \u2212 (55)  \u2212 (3,391) Change from Net financing cash flows 209 (1,232) (1,163)  \u2212 (41)  \u2212 (2,227) Other movements: Divestment and demerger of subsidiaries and operations  \u2212  \u2212 (492)  \u2212  \u2212  \u2212 Interest rate impacts  \u2212 (1,286)  \u2212  \u2212  \u2212 1,277 Foreign exchange impacts  3 (894) (126)  \u2212 (2) 898 Lease additions  \u2212  \u2212 866  \u2212  \u2212  \u2212 Remeasurement of index-linked freight contracts  \u2212  \u2212 (369)  \u2212  \u2212  \u2212 Other interest bearing liabilities/derivative related changes  \u2212 6 (36)  \u2212 2 70 At the end of the financial year 2,472 11,363 2,576  \u2212 17 1,688 1  FY2022 includes US$33 million of Discontinued operations cash flows. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfReconciliationOfLiabilitiesArisingFromFinancingActivitiesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-640": {
   "value": "25  Key management personnel Key management personnel compensation comprises: 2023  US$ 2022  US$ 2021  US$ Short-term employee benefits 13,599,217 13,979,139 14,081,625 Post-employment benefits 659,020 634,363 744,951 Share-based payments 11,455,666 11,165,439 11,601,866 Total 25,713,903 25,778,941 26,428,442 Key Management Personnel (KMP) includes the roles which have the authority and responsibility for planning, directing and controlling the activities of BHP. These are Non-executive Directors, the CEO, the Chief Financial Officer, the Chief Operating Officer, the President Australia and the President Americas. Transactions and outstanding loans/amounts with key management personnel There were no purchases by key management personnel from the Group during FY2023 (2022: US$ nil; 2021: US$ nil). There were no amounts payable by key management personnel at 30 June 2023 (2022: US$ nil; 2021: US$ nil). There were no loans receivable from or payable to key management personnel at 30 June 2023 (2022: US$ nil; 2021: US$ nil). Transactions with personally related entities A number of Directors of the Group hold or have held positions in other companies (personally related entities) where it is considered they control or significantly influence the financial or operating policies of those entities. There were no reportable transactions with those entities and no amounts were owed by the Group to personally related entities at 30 June 2023 (2022: US$ nil; 2021: US$ nil). For more information on remuneration and transactions with key management personnel, refer to the Remuneration Report under Governance. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInformationAboutKeyManagementPersonnelExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-683": {
   "value": "Transactions with personally related entities A number of Directors of the Group hold or have held positions in other companies (personally related entities) where it is considered they control or significantly influence the financial or operating policies of those entities. There were no reportable transactions with those entities and no amounts were owed by the Group to personally related entities at 30 June 2023 (2022: US$ nil; 2021: US$ nil). For more information on remuneration and transactions with key management personnel, refer to the Remuneration Report under Governance. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAmountsIncurredByEntityForProvisionOfKeyManagementPersonnelServicesProvidedBySeparateManagementEntitiesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-641": {
   "value": "26  Employee share ownership plans Awards, in the form of the right to receive ordinary shares in BHP Group Limited have been granted under the following employee share ownership plans: Cash and Deferred Plan (CDP), Short-Term Incentive Plan (STIP), Long-Term Incentive Plan (LTIP), Management Award Plan (MAP), Commencement awards and the all-employee share plan, Shareplus. Some awards are eligible to receive a cash payment, or the equivalent value in shares, equal to the dividend amount that would have been earned on the underlying shares awarded to those participants (the Dividend Equivalent Payment, or DEP). The DEP is provided to the participants once the underlying shares are allocated or transferred to them. Awards under the plans do not confer any rights to participate in a share issue; however, there is discretion under each of the plans to adjust the awards in response to a variation in the share capital of BHP Group Limited. The table below provides a description of each of the plans. Plan CDP and STIP LTIP and MAP Commencement awards Shareplus Type Short-term incentive Long-term incentive Long-term incentive All-employee share purchase plan Overview The CDP was implemented in FY2020 as a replacement for the STIP, both of which are generally plans for Executive KMP and members of the Executive Leadership Team who are not Executive KMP. Under the CDP, two thirds of the value of a participant\u2019s short-term incentive amount is awarded as rights to receive BHP Group Limited shares at the end of the vesting period (and the remaining one third is delivered in cash). Two awards of deferred shares are granted, each of the equivalent value to the cash award, vesting in two and five years respectively. Under the STIP, half of the value of a participant\u2019s short-term incentive amount was awarded as rights to receive BHP Group Limited shares at the end of the two-year vesting period. The LTIP is a plan for Executive KMP and members of the Executive Leadership Team who are not Executive KMP, and awards are granted annually. The MAP is a plan for BHP senior management who are not Executive KMP. The number of share rights awarded is determined by a participant\u2019s role and grade. Awards may be granted to new members of the Executive Leadership Team recruited into the Group to replace awards foregone from a previous company. Employees may contribute up to US$5,000 to acquire shares in any plan year. On the third anniversary of the start of a plan year, the Group will match the number of acquired shares. Vesting conditions CDP: Service conditions only for the two-year award. Vesting of the five-year award is subject to service conditions and also to holistic review of performance at the end of the five-year vesting period, including a five-year view on Safety and Sustainability (previously HSEC) performance, profitability, cash flow, balance sheet health, returns to shareholders, corporate governance and conduct. STIP: Service conditions only. LTIP: Service and performance conditions. From FY2023 BHP\u2019s Total Shareholder Return 1 (TSR) performance relative to two Morgan Stanley Capital International (MSCI) market indices, the MSCI World Metals and Mining Index (\u201cSector Group TSR\u201d) and the MSCI World Index (\u201cWorld TSR\u201d). The Sector Group TSR over a five-year performance period determines the vesting of 67 per cent of the awards, while performance relative to the World TSR determines the vesting of 33 per cent of the awards. For awards granted prior to FY2023, TSR performance relative to a bespoke sector peer group and the MSCI World Index determines the vesting of 67 per cent and 33 per cent of the award, respectively. 25 per cent of the award will vest where BHP\u2019s TSR is equal to the median TSR of the relevant comparator group(s), as measured over the performance period. Where TSR is below the median, awards will not vest. Vesting occurs on a sliding scale when BHP\u2019s TSR measured over the performance period is between the median TSR of the relevant comparator group(s) up to a nominated level of TSR outperformance over the relevant comparator group(s), as determined by the Committee, above which 100 per cent of the award will vest. MAP: Service conditions only. Service and performance conditions. The People and Remuneration Committee has absolute discretion to determine if the performance condition has been met and whether any, all or part of the award will vest (or otherwise lapse), having regard to personal performance and the underlying financial performance of the Group during the performance period. To the extent the performance condition is not achieved, awards will lapse. There is no retesting of the performance condition. Vested awards may be subject to a holding lock. Service conditions only. Vesting period CDP \u2013 2 and 5 years STIP \u2013 2 years LTIP \u2013 5 years MAP \u2013 1 to 5 years 2 years 3 years Dividend Equivalent Payment CDP \u2013 Yes STIP \u2013 Yes LTIP \u2013 Yes MAP \u2013 Varies Yes No Exercise period None  None None None 1  For LTIP awards granted prior to unification and where the five-year performance period ends after unification, the TSR at the start of the performance period is based on the weighted average of the TSRs of BHP Group Limited and BHP Group Plc and the TSR at the end of the performance period is based on the TSR of BHP Group Limited. Employee share awards 2023 Number of awards at the beginning of the  financial year Number of  awards issued during the year Number of awards vested and exercised Number of awards  lapsed Number of awards at the  end of the financial year Weighted  average remaining contractual  life (years) Weighted average share price at exercise date BHP Group Limited CDP awards 707,994 435,244 155,158 19,499 968,581 2.1 A$41.62 STIP awards 83,810  \u2212 83,810  \u2212  \u2212  \u2212 A$41.55 LTIP awards  3,143,477 622,992 1,175,882 31,791 2,558,796 2.2 A$41.59 MAP awards 1 7,094,173 2,404,671 2,353,273 491,845 6,653,726 1.2 A$41.74 Commencement awards 86,279  \u2212 69,025 17,254  \u2212  \u2212 A$41.55 Shareplus 4,914,470 3,089,822 2,330,077 550,364 5,123,851 1.3 A$44.88 1  There were no awards vested and exercisable at the end of the financial year. Fair value and assumptions in the calculation of fair value for awards issued 2023 Weighted average fair value of awards granted during the year US$ Risk-free interest rate Estimated life of awards Share price at  grant date Estimated volatility of share price Dividend yield BHP Group Limited CDP awards 28.88 n/a 2 and 5 years A$43.48 n/a n/a LTIP awards 20.22 3.33% 5 years A$43.48 34.0% n/a MAP awards 1 21.17 n/a 1-3 years A$37.96/A$46.97 n/a 7.5% up to 30 June 2024 and 5.0% per annum thereafter Shareplus  18.94 2.35% 3 years A$52.39 n/a 7.5% up to 30 June 2024 and 5.0% per annum thereafter 1  Includes MAP awards granted on 21 September 2022 and 3 April 2023. Recognition and measurement The fair value at grant date of equity-settled share awards is charged to the income statement over the period for which the benefits of employee services are expected to be derived. The fair values of awards granted were estimated using a Monte Carlo simulation methodology and Black-Scholes option pricing technique and consider the following factors: \u2013  exercise price \u2013  expected life of the award \u2013  current market price of the underlying shares \u2013  expected volatility using an analysis of historic volatility over different rolling periods. For the LTIP, it is calculated for all sector comparators and the published MSCI World Index \u2013  expected dividends \u2013  risk-free interest rate, which is an applicable government bond rate \u2013  market-based performance hurdles \u2013  non-vesting conditions Where awards are forfeited because non-market-based vesting conditions are not satisfied, the expense previously recognised is proportionately reversed. The tax effect of awards granted is recognised in income tax expense, except to the extent that the total tax deductions are expected to exceed the cumulative remuneration expense. In this situation, the excess of the associated current or deferred tax is recognised in equity and forms part of the employee share awards reserve. The fair value of awards as presented in the tables above represents the fair value at grant date. In respect of employee share awards, the Group utilises the BHP Group Limited Employee Equity Trust. The trustee of this trust is an independent company, resident in Jersey. The trust uses funds provided by the Group to acquire ordinary shares to enable awards to be made or satisfied. The ordinary shares may be acquired by purchase in the market or by subscription at not less than nominal value. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSharebasedPaymentArrangementsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-684": {
   "value": "The table below provides a description of each of the plans. Plan CDP and STIP LTIP and MAP Commencement awards Shareplus Type Short-term incentive Long-term incentive Long-term incentive All-employee share purchase plan Overview The CDP was implemented in FY2020 as a replacement for the STIP, both of which are generally plans for Executive KMP and members of the Executive Leadership Team who are not Executive KMP. Under the CDP, two thirds of the value of a participant\u2019s short-term incentive amount is awarded as rights to receive BHP Group Limited shares at the end of the vesting period (and the remaining one third is delivered in cash). Two awards of deferred shares are granted, each of the equivalent value to the cash award, vesting in two and five years respectively. Under the STIP, half of the value of a participant\u2019s short-term incentive amount was awarded as rights to receive BHP Group Limited shares at the end of the two-year vesting period. The LTIP is a plan for Executive KMP and members of the Executive Leadership Team who are not Executive KMP, and awards are granted annually. The MAP is a plan for BHP senior management who are not Executive KMP. The number of share rights awarded is determined by a participant\u2019s role and grade. Awards may be granted to new members of the Executive Leadership Team recruited into the Group to replace awards foregone from a previous company. Employees may contribute up to US$5,000 to acquire shares in any plan year. On the third anniversary of the start of a plan year, the Group will match the number of acquired shares. Vesting conditions CDP: Service conditions only for the two-year award. Vesting of the five-year award is subject to service conditions and also to holistic review of performance at the end of the five-year vesting period, including a five-year view on Safety and Sustainability (previously HSEC) performance, profitability, cash flow, balance sheet health, returns to shareholders, corporate governance and conduct. STIP: Service conditions only. LTIP: Service and performance conditions. From FY2023 BHP\u2019s Total Shareholder Return 1 (TSR) performance relative to two Morgan Stanley Capital International (MSCI) market indices, the MSCI World Metals and Mining Index (\u201cSector Group TSR\u201d) and the MSCI World Index (\u201cWorld TSR\u201d). The Sector Group TSR over a five-year performance period determines the vesting of 67 per cent of the awards, while performance relative to the World TSR determines the vesting of 33 per cent of the awards. For awards granted prior to FY2023, TSR performance relative to a bespoke sector peer group and the MSCI World Index determines the vesting of 67 per cent and 33 per cent of the award, respectively. 25 per cent of the award will vest where BHP\u2019s TSR is equal to the median TSR of the relevant comparator group(s), as measured over the performance period. Where TSR is below the median, awards will not vest. Vesting occurs on a sliding scale when BHP\u2019s TSR measured over the performance period is between the median TSR of the relevant comparator group(s) up to a nominated level of TSR outperformance over the relevant comparator group(s), as determined by the Committee, above which 100 per cent of the award will vest. MAP: Service conditions only. Service and performance conditions. The People and Remuneration Committee has absolute discretion to determine if the performance condition has been met and whether any, all or part of the award will vest (or otherwise lapse), having regard to personal performance and the underlying financial performance of the Group during the performance period. To the extent the performance condition is not achieved, awards will lapse. There is no retesting of the performance condition. Vested awards may be subject to a holding lock. Service conditions only. Vesting period CDP \u2013 2 and 5 years STIP \u2013 2 years LTIP \u2013 5 years MAP \u2013 1 to 5 years 2 years 3 years Dividend Equivalent Payment CDP \u2013 Yes STIP \u2013 Yes LTIP \u2013 Yes MAP \u2013 Varies Yes No Exercise period None  None None None 1  For LTIP awards granted prior to unification and where the five-year performance period ends after unification, the TSR at the start of the performance period is based on the weighted average of the TSRs of BHP Group Limited and BHP Group Plc and the TSR at the end of the performance period is based on the TSR of BHP Group Limited. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTermsAndConditionsOfSharebasedPaymentArrangementExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-708": {
   "value": "Employee share awards 2023 Number of awards at the beginning of the  financial year Number of  awards issued during the year Number of awards vested and exercised Number of awards  lapsed Number of awards at the  end of the financial year Weighted  average remaining contractual  life (years) Weighted average share price at exercise date BHP Group Limited CDP awards 707,994 435,244 155,158 19,499 968,581 2.1 A$41.62 STIP awards 83,810  \u2212 83,810  \u2212  \u2212  \u2212 A$41.55 LTIP awards  3,143,477 622,992 1,175,882 31,791 2,558,796 2.2 A$41.59 MAP awards 1 7,094,173 2,404,671 2,353,273 491,845 6,653,726 1.2 A$41.74 Commencement awards 86,279  \u2212 69,025 17,254  \u2212  \u2212 A$41.55 Shareplus 4,914,470 3,089,822 2,330,077 550,364 5,123,851 1.3 A$44.88 1  There were no awards vested and exercisable at the end of the financial year. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfNumberAndWeightedAverageRemainingContractualLifeOfOutstandingShareOptionsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-685": {
   "value": "Employee share awards 2023 Number of awards at the beginning of the  financial year Number of  awards issued during the year Number of awards vested and exercised Number of awards  lapsed Number of awards at the  end of the financial year Weighted  average remaining contractual  life (years) Weighted average share price at exercise date BHP Group Limited CDP awards 707,994 435,244 155,158 19,499 968,581 2.1 A$41.62 STIP awards 83,810  \u2212 83,810  \u2212  \u2212  \u2212 A$41.55 LTIP awards  3,143,477 622,992 1,175,882 31,791 2,558,796 2.2 A$41.59 MAP awards 1 7,094,173 2,404,671 2,353,273 491,845 6,653,726 1.2 A$41.74 Commencement awards 86,279  \u2212 69,025 17,254  \u2212  \u2212 A$41.55 Shareplus 4,914,470 3,089,822 2,330,077 550,364 5,123,851 1.3 A$44.88 1  There were no awards vested and exercisable at the end of the financial year. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfNumberAndWeightedAverageExercisePricesOfShareOptionsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-686": {
   "value": "Fair value and assumptions in the calculation of fair value for awards issued 2023 Weighted average fair value of awards granted during the year US$ Risk-free interest rate Estimated life of awards Share price at  grant date Estimated volatility of share price Dividend yield BHP Group Limited CDP awards 28.88 n/a 2 and 5 years A$43.48 n/a n/a LTIP awards 20.22 3.33% 5 years A$43.48 34.0% n/a MAP awards 1 21.17 n/a 1-3 years A$37.96/A$46.97 n/a 7.5% up to 30 June 2024 and 5.0% per annum thereafter Shareplus  18.94 2.35% 3 years A$52.39 n/a 7.5% up to 30 June 2024 and 5.0% per annum thereafter 1  Includes MAP awards granted on 21 September 2022 and 3 April 2023. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIndirectMeasurementOfFairValueOfGoodsOrServicesReceivedShareOptionsGrantedDuringPeriodExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-751": {
   "value": "Recognition and measurement The fair value at grant date of equity-settled share awards is charged to the income statement over the period for which the benefits of employee services are expected to be derived. The fair values of awards granted were estimated using a Monte Carlo simulation methodology and Black-Scholes option pricing technique and consider the following factors: \u2013  exercise price \u2013  expected life of the award \u2013  current market price of the underlying shares \u2013  expected volatility using an analysis of historic volatility over different rolling periods. For the LTIP, it is calculated for all sector comparators and the published MSCI World Index \u2013  expected dividends \u2013  risk-free interest rate, which is an applicable government bond rate \u2013  market-based performance hurdles \u2013  non-vesting conditions Where awards are forfeited because non-market-based vesting conditions are not satisfied, the expense previously recognised is proportionately reversed. The tax effect of awards granted is recognised in income tax expense, except to the extent that the total tax deductions are expected to exceed the cumulative remuneration expense. In this situation, the excess of the associated current or deferred tax is recognised in equity and forms part of the employee share awards reserve. The fair value of awards as presented in the tables above represents the fair value at grant date. In respect of employee share awards, the Group utilises the BHP Group Limited Employee Equity Trust. The trustee of this trust is an independent company, resident in Jersey. The trust uses funds provided by the Group to acquire ordinary shares to enable awards to be made or satisfied. The ordinary shares may be acquired by purchase in the market or by subscription at not less than nominal value. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForSharebasedPaymentTransactionsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-642": {
   "value": "27  Employee benefits, restructuring and post-retirement employee benefits provisions 2023  US$M 2022  US$M Employee benefits 1 1,749 1,351 Restructuring 2 28 27 Post-retirement employee benefits3 373 281 Total provisions  2,150 1,659 Comprising: Current 1,734 1,319 Non-current 416 340 2023 Employee benefits  US$M Restructuring US$M Post-retirement employee benefits3 US$M Total  US$M At the beginning of the financial year 1,351 27 281 1,659 Acquisition of subsidiaries and operations4 25  \u2212  \u2212 25 Charge/(credit) for the year: Underlying 1,675 26 75 1,776 Discounting  \u2212  \u2212 19 19 Net interest expense  \u2212  \u2212 (5) (5) Exchange variations (21)  \u2212 34 13 Released during the year (66)  \u2212 (2) (68) Remeasurement gains taken to retained earnings  \u2212  \u2212 18 18 Utilisation (1,204) (25) (47) (1,276) Transfers and other movements (11)  \u2212  \u2212 (11) At the end of the financial year 1,749 28 373 2,150 1  The expenditure associated with total employee benefits will occur in a pattern consistent with when employees choose to exercise their entitlement to benefits. 2  Total restructuring provisions include provisions for terminations and office closures. 3  The net liability recognised in the Consolidated Balance Sheet includes US$151 million present value of funded defined benefits pension obligation (2022: US$165 million) offset by fair value of defined benefit scheme assets US$(159) million (2022: US$(169) million), US$79 million present value of unfunded defined pension and post-retirement medical benefits obligation (2022: US$85 million) and US$302 million unfunded post-employment benefits obligation in Chile (2022: US$200 million). 4  Relates to the acquisition of OZL on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019 for more information. Recognition and measurement Provisions are recognised by the Group when: \u2013  there is a present legal or constructive obligation as a result of past events \u2013  it is more likely than not that a permanent outflow of resources will be required to settle the obligation \u2013  the amount can be reliably estimated and measured at the present value of management\u2019s best estimate of the cash outflow required to settle the obligation at the reporting date Provision Description Employee benefits Liabilities for benefits accruing to employees up until the reporting date in respect of wages and salaries, annual leave and any accumulating sick leave are recognised in the period the related service is rendered. Liabilities recognised in respect of short-term employee benefits expected to be settled within 12 months are measured at the amounts expected to be paid when the liabilities are settled. Liabilities for other long-term employee benefits, including long service leave, are measured as the present value of estimated future payments for the services provided by employees up to the reporting date. Liabilities that are not expected to be settled within 12 months are discounted at the reporting date using market yields of high-quality corporate bonds or government bonds for countries where there is no deep market for corporate bonds. The rates used reflect the terms to maturity and currency that match, as closely as possible, the estimated future cash outflows. In relation to industry-based long service leave funds, the Group\u2019s liability, including obligations for funding shortfalls, is determined after deducting the fair value of dedicated assets of such funds. Liabilities for short and long-term employee benefits (other than unpaid wages and salaries) are disclosed within employee benefits. Other liabilities for unpaid wages and salaries related to the current period are recognised in other creditors. Review of employee allowances and entitlements On 1 June 2023, the Group disclosed the identification of two issues with certain allowances and entitlements affecting a number of current and former employees in Australia. The identified issues relate to rostered employees having leave incorrectly deducted on public holidays since 2010 (Leave issue) and certain employees at Port Hedland being entitled to additional allowances due to an error with the employment entity in their contract (Port Hedland issue). The Group self-reported the issues to the Fair Work Ombudsman in Australia. The Group has applied extensive resources to the review and analysis of its records, with a dedicated team established to investigate and remediate the issues. Since the date of the announcement, the Group has progressed its analysis and has commenced contacting impacted employees. The Group has commenced paying additional allowances to those current employees impacted by the Port Hedland issue. The Group has also corrected the leave balances of current employees impacted by the Leave Issue. The Group\u2019s current best estimate of the cost of remediating the two issues, recognised in employee benefit provisions at 30 June 2023, is US$265 million, incorporating on-costs including associated superannuation and interest payments. The calculation of this provision involved a substantial volume of data and a significant degree of complexity with further detailed modelling and validation required to determine the final cost of remediation. As such, uncertainty remains in the amount and timing of final remediation costs, with the outcomes also subject to continuing engagement with regulatory authorities, including the Fair Work Ombudsman. A further US$15 million of other related costs were recognised in the year ended 30 June 2023, which do not form part of the employee benefit provision. As the Group has applied judgement in determining the provision for 30 June 2023, there is a risk that the provision may be adjusted in future reporting periods as the remediation process continues. The Group has also engaged a global assurance firm to conduct a thorough review of the Group\u2019s payroll systems. As this review is ongoing there is a risk that other instances of non-compliance requiring remediation may be identified and, as such, that associated provisions may be recognised in future reporting periods. Restructuring Restructuring provisions are recognised when: \u2013  the Group has developed a detailed formal plan identifying the business or part of the business concerned, the location and approximate number of employees affected, a detailed estimate of the associated costs, and an appropriate timeline \u2013  the restructuring has either commenced or been publicly announced and can no longer be withdrawn Payments that are not expected to be settled within 12 months of the reporting date are measured at the present value of the estimated future cash payments expected to be made by the Group. Post-retirement employee benefits Defined contribution pension schemes and multi-employer pension schemes For defined contribution schemes or schemes operated on an industry-wide basis where it is not possible to identify assets attributable to the participation by the Group\u2019s employees, the pension charge is calculated on the basis of contributions payable. The Group contributed US$358 million during the financial year (2022: US$324 million; 2021: US$301 million) to defined contribution plans and multi-employer defined contribution plans. These contributions are expensed as incurred. Defined benefit pension and post-retirement medical schemes The Group operates or participates in a number of defined benefit pension schemes throughout the world, all of which are closed to new entrants. The funding of the schemes complies with local regulations. The assets of the schemes are generally held separately from those of the Group and are administered by trustees or management boards. The Group also operates a number of unfunded post-retirement medical schemes in the United States, Canada and Europe. For defined benefit schemes, an asset or liability is recognised in the balance sheet based at the present value of defined benefit obligations less, where funded, the fair value of plan assets, except that any such asset cannot exceed the present value of expected refunds from and reductions in future contributions to the plan. Full actuarial valuations are prepared by local actuaries for all schemes, using discount rates based on market yields at the reporting date on high-quality corporate bonds or by reference to national government bonds if high-quality corporate bonds are not available. Where funded, scheme assets are invested in a diversified range of asset classes, predominantly comprising bonds and equities. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEmployeeBenefitsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-687": {
   "value": "3  The net liability recognised in the Consolidated Balance Sheet includes US$151 million present value of funded defined benefits pension obligation (2022: US$165 million) offset by fair value of defined benefit scheme assets US$(159) million (2022: US$(169) million), US$79 million present value of unfunded defined pension and post-retirement medical benefits obligation (2022: US$85 million) and US$302 million unfunded post-employment benefits obligation in Chile (2022: US$200 million). ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfNetDefinedBenefitLiabilityAssetExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-709": {
   "value": "3  The net liability recognised in the Consolidated Balance Sheet includes US$151 million present value of funded defined benefits pension obligation (2022: US$165 million) offset by fair value of defined benefit scheme assets US$(159) million (2022: US$(169) million), US$79 million present value of unfunded defined pension and post-retirement medical benefits obligation (2022: US$85 million) and US$302 million unfunded post-employment benefits obligation in Chile (2022: US$200 million). ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFairValueOfPlanAssetsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-752": {
   "value": "Recognition and measurement Provisions are recognised by the Group when: \u2013  there is a present legal or constructive obligation as a result of past events \u2013  it is more likely than not that a permanent outflow of resources will be required to settle the obligation \u2013  the amount can be reliably estimated and measured at the present value of management\u2019s best estimate of the cash outflow required to settle the obligation at the reporting date Provision Description Employee benefits Liabilities for benefits accruing to employees up until the reporting date in respect of wages and salaries, annual leave and any accumulating sick leave are recognised in the period the related service is rendered. Liabilities recognised in respect of short-term employee benefits expected to be settled within 12 months are measured at the amounts expected to be paid when the liabilities are settled. Liabilities for other long-term employee benefits, including long service leave, are measured as the present value of estimated future payments for the services provided by employees up to the reporting date. Liabilities that are not expected to be settled within 12 months are discounted at the reporting date using market yields of high-quality corporate bonds or government bonds for countries where there is no deep market for corporate bonds. The rates used reflect the terms to maturity and currency that match, as closely as possible, the estimated future cash outflows. In relation to industry-based long service leave funds, the Group\u2019s liability, including obligations for funding shortfalls, is determined after deducting the fair value of dedicated assets of such funds. Liabilities for short and long-term employee benefits (other than unpaid wages and salaries) are disclosed within employee benefits. Other liabilities for unpaid wages and salaries related to the current period are recognised in other creditors. Review of employee allowances and entitlements On 1 June 2023, the Group disclosed the identification of two issues with certain allowances and entitlements affecting a number of current and former employees in Australia. The identified issues relate to rostered employees having leave incorrectly deducted on public holidays since 2010 (Leave issue) and certain employees at Port Hedland being entitled to additional allowances due to an error with the employment entity in their contract (Port Hedland issue). The Group self-reported the issues to the Fair Work Ombudsman in Australia. The Group has applied extensive resources to the review and analysis of its records, with a dedicated team established to investigate and remediate the issues. Since the date of the announcement, the Group has progressed its analysis and has commenced contacting impacted employees. The Group has commenced paying additional allowances to those current employees impacted by the Port Hedland issue. The Group has also corrected the leave balances of current employees impacted by the Leave Issue. The Group\u2019s current best estimate of the cost of remediating the two issues, recognised in employee benefit provisions at 30 June 2023, is US$265 million, incorporating on-costs including associated superannuation and interest payments. The calculation of this provision involved a substantial volume of data and a significant degree of complexity with further detailed modelling and validation required to determine the final cost of remediation. As such, uncertainty remains in the amount and timing of final remediation costs, with the outcomes also subject to continuing engagement with regulatory authorities, including the Fair Work Ombudsman. A further US$15 million of other related costs were recognised in the year ended 30 June 2023, which do not form part of the employee benefit provision. As the Group has applied judgement in determining the provision for 30 June 2023, there is a risk that the provision may be adjusted in future reporting periods as the remediation process continues. The Group has also engaged a global assurance firm to conduct a thorough review of the Group\u2019s payroll systems. As this review is ongoing there is a risk that other instances of non-compliance requiring remediation may be identified and, as such, that associated provisions may be recognised in future reporting periods. Restructuring Restructuring provisions are recognised when: \u2013  the Group has developed a detailed formal plan identifying the business or part of the business concerned, the location and approximate number of employees affected, a detailed estimate of the associated costs, and an appropriate timeline \u2013  the restructuring has either commenced or been publicly announced and can no longer be withdrawn Payments that are not expected to be settled within 12 months of the reporting date are measured at the present value of the estimated future cash payments expected to be made by the Group. Post-retirement employee benefits Defined contribution pension schemes and multi-employer pension schemes For defined contribution schemes or schemes operated on an industry-wide basis where it is not possible to identify assets attributable to the participation by the Group\u2019s employees, the pension charge is calculated on the basis of contributions payable. The Group contributed US$358 million during the financial year (2022: US$324 million; 2021: US$301 million) to defined contribution plans and multi-employer defined contribution plans. These contributions are expensed as incurred. Defined benefit pension and post-retirement medical schemes The Group operates or participates in a number of defined benefit pension schemes throughout the world, all of which are closed to new entrants. The funding of the schemes complies with local regulations. The assets of the schemes are generally held separately from those of the Group and are administered by trustees or management boards. The Group also operates a number of unfunded post-retirement medical schemes in the United States, Canada and Europe. For defined benefit schemes, an asset or liability is recognised in the balance sheet based at the present value of defined benefit obligations less, where funded, the fair value of plan assets, except that any such asset cannot exceed the present value of expected refunds from and reductions in future contributions to the plan. Full actuarial valuations are prepared by local actuaries for all schemes, using discount rates based on market yields at the reporting date on high-quality corporate bonds or by reference to national government bonds if high-quality corporate bonds are not available. Where funded, scheme assets are invested in a diversified range of asset classes, predominantly comprising bonds and equities. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForEmployeeBenefitsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-688": {
   "value": "Defined contribution pension schemes and multi-employer pension schemes For defined contribution schemes or schemes operated on an industry-wide basis where it is not possible to identify assets attributable to the participation by the Group\u2019s employees, the pension charge is calculated on the basis of contributions payable. The Group contributed US$358 million during the financial year (2022: US$324 million; 2021: US$301 million) to defined contribution plans and multi-employer defined contribution plans. These contributions are expensed as incurred. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDefinedContributionPlansExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-689": {
   "value": "Defined benefit pension and post-retirement medical schemes The Group operates or participates in a number of defined benefit pension schemes throughout the world, all of which are closed to new entrants. The funding of the schemes complies with local regulations. The assets of the schemes are generally held separately from those of the Group and are administered by trustees or management boards. The Group also operates a number of unfunded post-retirement medical schemes in the United States, Canada and Europe. For defined benefit schemes, an asset or liability is recognised in the balance sheet based at the present value of defined benefit obligations less, where funded, the fair value of plan assets, except that any such asset cannot exceed the present value of expected refunds from and reductions in future contributions to the plan. Full actuarial valuations are prepared by local actuaries for all schemes, using discount rates based on market yields at the reporting date on high-quality corporate bonds or by reference to national government bonds if high-quality corporate bonds are not available. Where funded, scheme assets are invested in a diversified range of asset classes, predominantly comprising bonds and equities. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDefinedBenefitPlansExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-643": {
   "value": "28  Discontinued operations On 1 June 2022 (Completion date) BHP completed the merger of the Group\u2019s oil and gas portfolio with Woodside Energy Group Limited (\u2018Woodside\u2019). Woodside acquired the entire share capital of BHP Petroleum International Pty Ltd (\u2018BHP Petroleum\u2019) in exchange for 914,768,948 newly issued Woodside ordinary shares. On the Completion Date, the Group paid a fully franked in specie dividend in the form of Woodside shares to eligible BHP shareholders. Eligible BHP shareholders received one Woodside share for every 5.5340 BHP shares they held on the Group\u2019s register at the record date of 26 May 2022. As part of completion and in order to reflect the economic effective date of 1 July 2021, the Group made a net cash payment of US$0.7 billion (net of completion adjustments) to Woodside in addition to US$0.4 billion in cash that was left in the BHP Petroleum bank accounts to fund ongoing operations. The total cash transfer of US$1.1 billion reflected the net cash flows generated by BHP Petroleum between 1 July 2021 and Completion Date adjusted for dividends Woodside would have paid on the newly issued Woodside ordinary shares, had the Merger completed on 1 July 2021. There was no contribution of Discontinued operations to the Group\u2019s profit and cash flows for the year ended 30 June 2023. The contribution of Discontinued operations for the years ended 30 June 2022 and 30 June 2021 is detailed below: Income statement \u2013 Discontinued operations 2022  US$M 2021  US$M Profit/(loss) after taxation from operating activities 2,496 (225) Net gain on Petroleum merger with Woodside (after tax)  8,159  \u2212 Profit/(loss) after taxation 10,655 (225) Attributable to non-controlling interests  \u2212  \u2212 Attributable to BHP shareholders 10,655 (225) Basic earnings/(loss) per ordinary share (cents) 210.5 (4.5) Diluted earnings/(loss) per ordinary share (cents) 210.1 (4.5) The total comprehensive income attributable to BHP shareholders from Discontinued operations was a gain of US$10,596 million for the year ended 30 June 2022 (2021: US$231 million loss). The conversion of options and share rights would decrease the loss per share for the year ended 30 June 2021, therefore its impact has been excluded from the diluted earnings per share calculation. Cash flows from Discontinued operations 2022  US$M 2021  US$M Net operating cash flows 2,889 1,351 Net investing cash flows1 (904) (1,520) Net financing cash flows2 (33) (38) Net increase/(decrease) in cash and cash equivalents from Discontinued operations 1,952 (207) Net cash completion payment on merger of Petroleum with Woodside  (683)  \u2212 Cash and cash equivalents disposed (399)  \u2212 Total cash impact 870 (207) 1  Includes purchases of property, plant and equipment and capitalised exploration related to drilling and development expenditure of US$1,144 million for FY2022 (2021:US$1,020 million), proceeds from sale of subsidiaries, operations and joint operations, net of cash of US$91 million for FY2022 (2021: investment of US$480 million), proceeds from sale of assets of US$151 million for FY2022 (2021: US$39 million) and other investing outflows of US$2 million for FY2022 (2021: outflow of US$59 million). 2  Represents net repayment of interest bearing liabilities of US$33 million for FY2022 (2021: US$38 million). Exceptional items \u2013 Discontinued operations Exceptional items are those gains or losses where their nature, including the expected frequency of the events giving rise to them, and impact is considered material to the Financial Statements. There were no exceptional items related to Discontinued operations for the year ended 30 June 2023. Exceptional items related to Discontinued operations included within the Group\u2019s profits for the years ended 30 June 2022 and 30 June 2021 are detailed below. Year ended 30 June 2022 Gross  US$M Tax  US$M Net  US$M Exceptional items by category Net gain on Petroleum merger with Woodside1  8,167 (8) 8,159 Total 8,167 (8) 8,159 Attributable to non-controlling interests  \u2212  \u2212  \u2212 Attributable to BHP shareholders 8,167 (8) 8,159 1  The tax expense associated with the exceptional item reflects the tax impact of transaction costs and other restructuring related activities undertaken pre-merger. There were no further tax impacts arising on the net gain on merger of our Petroleum business with Woodside as generated tax losses were either offset with capital gains in other entities in the Group, or not recognised on the basis that it is not probable that future capital gains will be available against which the Group can utilise the tax losses. Net gain on disposal of Discontinued operations Details of the net gain on Petroleum merger with Woodside is presented below: 2022  US$M Net assets disposed 10,172 Fair value of Woodside shares 1 19,566 Net cash completion payment on merger of Petroleum with Woodside2 (683) Foreign currency translation reserve transferred to the income statement 54 Other provisions and related indemnities recognised at completion (353) Transaction and other directly attributable costs (245) Income tax expense (8) Net gain on Petroleum merger with Woodside 8,159 1  Represents the consideration received being the fair value of 914,768,948 Woodside ordinary shares received using the closing ASX share price of A$29.76 on 31 May 2022 (US$21.39 equivalent based on an exchange rate of AUD/USD 0.7187). 2  Reflects the net cash flows generated by BHP Petroleum between 1 July 2021 and Completion Date adjusted for dividends Woodside would have paid on the newly issued Woodside ordinary shares, had the Merger completed on 1 July 2021. Year ended 30 June 2021 Gross  US$M Tax  US$M Net  US$M Exceptional items by category Impairment of Potash assets1 \u2212 (278) (278) COVID-19 related costs (47) 8 (39) Total (47) (270) (317) Attributable to non-controlling interests   \u2212  \u2212  \u2212 Attributable to BHP shareholders (47) (270) (317) 1  The exceptional item reflects the impairment of tax losses originally expected to be recoverable against taxable profits from the Group\u2019s Potash assets. The impairment is included in Discontinued operations as the entity with the losses transferred to Woodside and therefore the losses are no longer available to the Group.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDiscontinuedOperationsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-644": {
   "value": "29 Business combinations OZ Minerals Limited On 2 May 2023 (Acquisition Date), the Group acquired 100 per cent of the issued share capital of OZ Minerals Limited (OZL) for a net cash consideration of US$5.9 billion. The terms of the acquisition did not include any contingent consideration. OZL is a mining and exploration company with a portfolio of operating, development and exploration stage projects both in Australia and internationally. OZL\u2019s primary activities consist of Prominent Hill and Carrapateena copper-gold mines in South Australia, West Musgrave copper-nickel development project in Western Australia and Caraj\u00e1s East copper-gold hub in Brazil. This acquisition provides the Group with further exposure to copper, nickel and uranium. Acquisition related costs of US$107 million and integration costs of US$24 million have been expensed and included in other operating expenses in the income statement. The provisional fair values of the identifiable assets and liabilities acquired as of the date of acquisition were: 2023  US$M Assets Cash and cash equivalents 104 Trade and other receivables1 77 Other financial assets 7 Inventories 329 Property, plant and equipment 7,676 Intangible assets \u2013 goodwill 192 Current tax receivable 36 Other assets 25 Total assets 8,446 Liabilities Trade and other payables 242 Interest bearing liabilities 1,111 Deferred tax liabilities2 867 Provisions 254 Total liabilities 2,474 Identifiable net assets acquired 5,972 Total consideration paid 3,4 5,972 Cash and cash equivalents acquired (104) Net cash consideration paid 5,868 1  This represents the gross contractual amount for trade and other receivables all of which is expected to be collected. 2  This primarily represents the difference between the provisional fair value of the mineral rights acquired and the corresponding tax base. 3  The Group executed a forward exchange contract to hedge the foreign exchange exposure on the consideration made in AUD. On maturity of the hedging instrument, a hedge loss of US$35 million was capitalised to the cost of the acquisition. 4  The consideration paid by the Group was A$26.50 (at the average hedged exchange rate of AUD/USD 0.6681) per OZL share over 337,314,920 shares and excluded a special dividend of A$1.75 per OZL share which was paid by OZL to its shareholders immediately prior to acquisition. The fair values disclosed are provisional as at 30 June 2023. Due to the size, complexity and timing of the acquisition, the valuation process is ongoing and will be completed within 12 months of the acquisition. Goodwill of US$192 million has been provisionally recognised, representing the excess of consideration paid above the provisional fair value of the acquired assets and liabilities. The goodwill primarily arises from the deferred tax liability recognised at acquisition due to a difference between the provisional fair value of mineral rights acquired and the corresponding tax base. The goodwill represents the provisional amount, which could not be reliably allocated to a CGU or group of CGUs at 30 June 2023. None of the goodwill recognised is expected to be deductible for tax purposes. OZL contributed revenue of US$315 million and profit after taxation of US$17 million to the Group from acquisition date to 30 June 2023. The estimated OZL contribution to revenue and profit after taxation of the combined Group for the year ended 30 June 2023, had the acquisition occurred on 1 July 2022, would have been US$1,410 million and US$114 million, respectively. There were no business combinations entered into by the Group in the previous financial year. Key judgements and estimates Judgements: Judgement is required to determine the fair value of assets acquired and liabilities assumed at acquisition date in a business combination, which could have a material impact on goodwill. Estimates: The Group used the discounted cash-flow method to measure the fair value of mineral rights. Key assumptions used included commodity prices, production volumes, life of mine, cash outflows (including operating costs, capital expenditure, closure and rehabilitation costs and taxes), discount rates and risking factors. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBusinessCombinationsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-690": {
   "value": "OZ Minerals Limited On 2 May 2023 (Acquisition Date), the Group acquired 100 per cent of the issued share capital of OZ Minerals Limited (OZL) for a net cash consideration of US$5.9 billion. The terms of the acquisition did not include any contingent consideration. OZL is a mining and exploration company with a portfolio of operating, development and exploration stage projects both in Australia and internationally. OZL\u2019s primary activities consist of Prominent Hill and Carrapateena copper-gold mines in South Australia, West Musgrave copper-nickel development project in Western Australia and Caraj\u00e1s East copper-gold hub in Brazil. This acquisition provides the Group with further exposure to copper, nickel and uranium. Acquisition related costs of US$107 million and integration costs of US$24 million have been expensed and included in other operating expenses in the income statement. The provisional fair values of the identifiable assets and liabilities acquired as of the date of acquisition were: 2023  US$M Assets Cash and cash equivalents 104 Trade and other receivables1 77 Other financial assets 7 Inventories 329 Property, plant and equipment 7,676 Intangible assets \u2013 goodwill 192 Current tax receivable 36 Other assets 25 Total assets 8,446 Liabilities Trade and other payables 242 Interest bearing liabilities 1,111 Deferred tax liabilities2 867 Provisions 254 Total liabilities 2,474 Identifiable net assets acquired 5,972 Total consideration paid 3,4 5,972 Cash and cash equivalents acquired (104) Net cash consideration paid 5,868 1  This represents the gross contractual amount for trade and other receivables all of which is expected to be collected. 2  This primarily represents the difference between the provisional fair value of the mineral rights acquired and the corresponding tax base. 3  The Group executed a forward exchange contract to hedge the foreign exchange exposure on the consideration made in AUD. On maturity of the hedging instrument, a hedge loss of US$35 million was capitalised to the cost of the acquisition. 4  The consideration paid by the Group was A$26.50 (at the average hedged exchange rate of AUD/USD 0.6681) per OZL share over 337,314,920 shares and excluded a special dividend of A$1.75 per OZL share which was paid by OZL to its shareholders immediately prior to acquisition. The fair values disclosed are provisional as at 30 June 2023. Due to the size, complexity and timing of the acquisition, the valuation process is ongoing and will be completed within 12 months of the acquisition. Goodwill of US$192 million has been provisionally recognised, representing the excess of consideration paid above the provisional fair value of the acquired assets and liabilities. The goodwill primarily arises from the deferred tax liability recognised at acquisition due to a difference between the provisional fair value of mineral rights acquired and the corresponding tax base. The goodwill represents the provisional amount, which could not be reliably allocated to a CGU or group of CGUs at 30 June 2023. None of the goodwill recognised is expected to be deductible for tax purposes. OZL contributed revenue of US$315 million and profit after taxation of US$17 million to the Group from acquisition date to 30 June 2023. The estimated OZL contribution to revenue and profit after taxation of the combined Group for the year ended 30 June 2023, had the acquisition occurred on 1 July 2022, would have been US$1,410 million and US$114 million, respectively. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDetailedInformationAboutBusinessCombinationsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-691": {
   "value": "30 Subsidiaries<span class=\"_ _39c\"> </span>Significant subsidiaries of the Group are those with the most significant contribution to the Group\u2019s net profit or net assets. <span class=\"_ _2\"></span>The Group\u2019s interest in the subsidiaries\u2019<span class=\"_ _2\"></span> results are listed in the table below<span class=\"_ _2\"></span>. Significant subsidiaries Country of incorporation<span class=\"_ _39c\"> </span>Principal activity<span class=\"_ _39c\"> </span>Group\u2019s interest<span class=\"_ _39c\"> </span>2023 <span class=\"_ _2\"></span> %<span class=\"_ _39c\"> </span>2022 <span class=\"_ _2\"></span> %<span class=\"_ _39c\"> </span>Coal<span class=\"_ _39c\"> </span>Hunter V<span class=\"_ _2\"></span>alley Energy Coal Pty Ltd<span class=\"_ _201\"> </span>Australia<span class=\"_ _168\"> </span>Coal mining<span class=\"_ _338\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span>Copper<span class=\"_ _39c\"> </span>BHP Olympic Dam Corporation Pty Ltd<span class=\"_ _339\"> </span>Australia<span class=\"_ _168\"> </span>Copper and uranium mining<span class=\"_ _33a\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 Compa\u00f1ia Minera Cerro Colorado Limitada<span class=\"_ _203\"> </span>Chile<span class=\"_ _ec\"> </span>Copper mining<span class=\"_ _2e9\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 Minera Escondida Ltda1<span class=\"_ _39c\"> </span>Chile<span class=\"_ _200\"> </span>Copper mining<span class=\"_ _33b\"> </span><span class=\"ff75\">57.5<span class=\"_ _51\"> </span></span>57.5<span class=\"_ _39c\"> </span>Minera Spence SA<span class=\"_ _1ad\"> </span>Chile<span class=\"_ _200\"> </span>Copper mining<span class=\"_ _33c\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span>OZ Minerals Carrapateena Pty Ltd2<span class=\"_ _39c\"> </span>Australia<span class=\"_ _168\"> </span>Copper<span class=\"_ _2\"></span>, gold and silver mining<span class=\"_ _85\"> </span><span class=\"ff75\">100<span class=\"_ _206\"> </span><span class=\"ff77\">\u2013<span class=\"_ _39c\"> </span></span></span>OZ Minerals Prominent Hill Operations Pty Ltd2<span class=\"_ _39c\"> </span>Australia<span class=\"_ _168\"> </span>Copper<span class=\"_ _2\"></span>, gold and silver mining<span class=\"_ _85\"> </span><span class=\"ff75\">100<span class=\"_ _206\"> </span><span class=\"ff77\">\u2013 </span></span>Iron Ore<span class=\"_ _39c\"> </span>BHP Iron Ore (Jimblebar) Pty Ltd3<span class=\"_ _39c\"> </span>Australia<span class=\"_ _168\"> </span>Iron ore mining<span class=\"_ _1ea\"> </span><span class=\"ff75\">85<span class=\"_ _d0\"> </span></span>85 BHP Iron Ore Pty Ltd<span class=\"_ _c0\"> </span>Australia<span class=\"_ _e\"> </span>Service company<span class=\"_ _1d8\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span>BHP (T<span class=\"_ _50\"></span>owage Service) Pty Ltd<span class=\"_ _110\"> </span>Australia<span class=\"_ _168\"> </span>T<span class=\"_ _2a\"></span>owing services<span class=\"_ _2ca\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span>Marketing<span class=\"_ _39c\"> </span>BHP Billiton Freight Singapore Pte Limited<span class=\"_ _b5\"> </span>Singapore<span class=\"_ _250\"> </span>Freight services<span class=\"_ _2ca\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 BHP Billiton Marketing <span class=\"_ _2\"></span>AG<span class=\"_ _290\"> </span>Switzerland<span class=\"_ _d0\"> </span>Marketing and trading<span class=\"_ _24d\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 BHP Billiton Marketing <span class=\"_ _2\"></span>Asia Pte Ltd<span class=\"_ _2e7\"> </span>Singapore<span class=\"_ _1a\"> </span>Marketing support and other services<span class=\"_ _78\"> </span><span class=\"ff75\">100<span class=\"_ _107\"> </span></span>100 Group and Unallocated<span class=\"_ _39c\"> </span>BHP Billiton Finance B.V<span class=\"_ _2a\"></span>.<span class=\"_ _1ac\"> </span>The Netherlands<span class=\"_ _8c\"> </span>Finance<span class=\"_ _244\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 BHP Billiton Finance Limited<span class=\"_ _7\"> </span>Australia<span class=\"_ _168\"> </span>Finance<span class=\"_ _244\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 BHP Billiton Finance (USA) Limited <span class=\"_ _1f\"> </span>Australia<span class=\"_ _168\"> </span>Finance<span class=\"_ _244\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 BHP Canada Inc.<span class=\"_ _21d\"> </span>Canada<span class=\"_ _1b\"> </span>Potash development<span class=\"_ _2f1\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span>BHP Group Operations Pty Ltd<span class=\"_ _18\"> </span>Australia<span class=\"_ _168\"> </span>Administrative services<span class=\"_ _198\"> </span><span class=\"ff75\">100<span class=\"_ _107\"> </span></span>100 BHP Nickel W<span class=\"_ _2\"></span>est Pty Ltd<span class=\"_ _1c3\"> </span>Australia<span class=\"_ _168\"> </span><span class=\"ff77\">Nickel mining, smelting, refining and administrative services<span class=\"_ _c5\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span></span>100 OZ Minerals Musgrave Operations Pty Ltd<span class=\"_ _39c\"> </span>2<span class=\"_ _39c\"> </span>Australia<span class=\"_ _168\"> </span>Copper and nickel mining<span class=\"_ _23a\"> </span><span class=\"ff75\">100<span class=\"_ _1a\"> </span><span class=\"ff77\">\u2013 </span></span>WMC Finance (USA) Limited<span class=\"_ _137\"> </span>Australia<span class=\"_ _168\"> </span>Finance<span class=\"_ _244\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span>1 <span class=\"_ _42\"> </span>As the Group has the ability to direct the relevant activities at Minera Escondida Ltda, it has control over the entity<span class=\"_ _2\"></span>. The assessment of the most relevant activity in this contractual arrangement is subject to judgement. The Group establishes the mine plan and the operating budget and has the ability to appoint the key management personnel, demonstrating that the Group has the existing rights to direct the relevant activities of Minera Escondida Ltda.<span class=\"_ _39c\"> </span>2 <span class=\"_ _42\"> </span>The acquisition of BHP\u2019s 100 per cent interest in OZ Minerals Limited completed on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019<span class=\"_ _2\"></span> for further information. 3 <span class=\"_ _42\"> </span>The Group has an effective interest of 92.5 per cent in BHP Iron Ore (Jimblebar) Pty Ltd; however<span class=\"_ _2a\"></span>, by virtue of the shareholder agreement with ITOCHU Iron Ore Australia Pty Ltd and Mitsui &amp; Co. Iron Ore Exploration &amp; Mining Pty Ltd, the Group\u2019s interest in the Jimblebar mining operation is 85 per cent, which is consistent with the other respective contractual arrangements at Western <span class=\"_ _2\"></span>Australia Iron Ore.<span class=\"_ _39c\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInterestsInSubsidiariesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-645": {
   "value": "30 Subsidiaries<span class=\"_ _39c\"> </span>Significant subsidiaries of the Group are those with the most significant contribution to the Group\u2019s net profit or net assets. <span class=\"_ _2\"></span>The Group\u2019s interest in the subsidiaries\u2019<span class=\"_ _2\"></span> results are listed in the table below<span class=\"_ _2\"></span>. Significant subsidiaries Country of incorporation<span class=\"_ _39c\"> </span>Principal activity<span class=\"_ _39c\"> </span>Group\u2019s interest<span class=\"_ _39c\"> </span>2023 <span class=\"_ _2\"></span> %<span class=\"_ _39c\"> </span>2022 <span class=\"_ _2\"></span> %<span class=\"_ _39c\"> </span>Coal<span class=\"_ _39c\"> </span>Hunter V<span class=\"_ _2\"></span>alley Energy Coal Pty Ltd<span class=\"_ _201\"> </span>Australia<span class=\"_ _168\"> </span>Coal mining<span class=\"_ _338\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span>Copper<span class=\"_ _39c\"> </span>BHP Olympic Dam Corporation Pty Ltd<span class=\"_ _339\"> </span>Australia<span class=\"_ _168\"> </span>Copper and uranium mining<span class=\"_ _33a\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 Compa\u00f1ia Minera Cerro Colorado Limitada<span class=\"_ _203\"> </span>Chile<span class=\"_ _ec\"> </span>Copper mining<span class=\"_ _2e9\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 Minera Escondida Ltda1<span class=\"_ _39c\"> </span>Chile<span class=\"_ _200\"> </span>Copper mining<span class=\"_ _33b\"> </span><span class=\"ff75\">57.5<span class=\"_ _51\"> </span></span>57.5<span class=\"_ _39c\"> </span>Minera Spence SA<span class=\"_ _1ad\"> </span>Chile<span class=\"_ _200\"> </span>Copper mining<span class=\"_ _33c\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span>OZ Minerals Carrapateena Pty Ltd2<span class=\"_ _39c\"> </span>Australia<span class=\"_ _168\"> </span>Copper<span class=\"_ _2\"></span>, gold and silver mining<span class=\"_ _85\"> </span><span class=\"ff75\">100<span class=\"_ _206\"> </span><span class=\"ff77\">\u2013<span class=\"_ _39c\"> </span></span></span>OZ Minerals Prominent Hill Operations Pty Ltd2<span class=\"_ _39c\"> </span>Australia<span class=\"_ _168\"> </span>Copper<span class=\"_ _2\"></span>, gold and silver mining<span class=\"_ _85\"> </span><span class=\"ff75\">100<span class=\"_ _206\"> </span><span class=\"ff77\">\u2013 </span></span>Iron Ore<span class=\"_ _39c\"> </span>BHP Iron Ore (Jimblebar) Pty Ltd3<span class=\"_ _39c\"> </span>Australia<span class=\"_ _168\"> </span>Iron ore mining<span class=\"_ _1ea\"> </span><span class=\"ff75\">85<span class=\"_ _d0\"> </span></span>85 BHP Iron Ore Pty Ltd<span class=\"_ _c0\"> </span>Australia<span class=\"_ _e\"> </span>Service company<span class=\"_ _1d8\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span>BHP (T<span class=\"_ _50\"></span>owage Service) Pty Ltd<span class=\"_ _110\"> </span>Australia<span class=\"_ _168\"> </span>T<span class=\"_ _2a\"></span>owing services<span class=\"_ _2ca\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span>Marketing<span class=\"_ _39c\"> </span>BHP Billiton Freight Singapore Pte Limited<span class=\"_ _b5\"> </span>Singapore<span class=\"_ _250\"> </span>Freight services<span class=\"_ _2ca\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 BHP Billiton Marketing <span class=\"_ _2\"></span>AG<span class=\"_ _290\"> </span>Switzerland<span class=\"_ _d0\"> </span>Marketing and trading<span class=\"_ _24d\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 BHP Billiton Marketing <span class=\"_ _2\"></span>Asia Pte Ltd<span class=\"_ _2e7\"> </span>Singapore<span class=\"_ _1a\"> </span>Marketing support and other services<span class=\"_ _78\"> </span><span class=\"ff75\">100<span class=\"_ _107\"> </span></span>100 Group and Unallocated<span class=\"_ _39c\"> </span>BHP Billiton Finance B.V<span class=\"_ _2a\"></span>.<span class=\"_ _1ac\"> </span>The Netherlands<span class=\"_ _8c\"> </span>Finance<span class=\"_ _244\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 BHP Billiton Finance Limited<span class=\"_ _7\"> </span>Australia<span class=\"_ _168\"> </span>Finance<span class=\"_ _244\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 BHP Billiton Finance (USA) Limited <span class=\"_ _1f\"> </span>Australia<span class=\"_ _168\"> </span>Finance<span class=\"_ _244\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100 BHP Canada Inc.<span class=\"_ _21d\"> </span>Canada<span class=\"_ _1b\"> </span>Potash development<span class=\"_ _2f1\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span>BHP Group Operations Pty Ltd<span class=\"_ _18\"> </span>Australia<span class=\"_ _168\"> </span>Administrative services<span class=\"_ _198\"> </span><span class=\"ff75\">100<span class=\"_ _107\"> </span></span>100 BHP Nickel W<span class=\"_ _2\"></span>est Pty Ltd<span class=\"_ _1c3\"> </span>Australia<span class=\"_ _168\"> </span><span class=\"ff77\">Nickel mining, smelting, refining and administrative services<span class=\"_ _c5\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span></span>100 OZ Minerals Musgrave Operations Pty Ltd<span class=\"_ _39c\"> </span>2<span class=\"_ _39c\"> </span>Australia<span class=\"_ _168\"> </span>Copper and nickel mining<span class=\"_ _23a\"> </span><span class=\"ff75\">100<span class=\"_ _1a\"> </span><span class=\"ff77\">\u2013 </span></span>WMC Finance (USA) Limited<span class=\"_ _137\"> </span>Australia<span class=\"_ _168\"> </span>Finance<span class=\"_ _244\"> </span><span class=\"ff75\">100<span class=\"_ _81\"> </span></span>100<span class=\"_ _39c\"> </span>1 <span class=\"_ _42\"> </span>As the Group has the ability to direct the relevant activities at Minera Escondida Ltda, it has control over the entity<span class=\"_ _2\"></span>. The assessment of the most relevant activity in this contractual arrangement is subject to judgement. The Group establishes the mine plan and the operating budget and has the ability to appoint the key management personnel, demonstrating that the Group has the existing rights to direct the relevant activities of Minera Escondida Ltda.<span class=\"_ _39c\"> </span>2 <span class=\"_ _42\"> </span>The acquisition of BHP\u2019s 100 per cent interest in OZ Minerals Limited completed on 2 May 2023. Refer to note 29 \u2018Business combinations\u2019<span class=\"_ _2\"></span> for further information. 3 <span class=\"_ _42\"> </span>The Group has an effective interest of 92.5 per cent in BHP Iron Ore (Jimblebar) Pty Ltd; however<span class=\"_ _2a\"></span>, by virtue of the shareholder agreement with ITOCHU Iron Ore Australia Pty Ltd and Mitsui &amp; Co. Iron Ore Exploration &amp; Mining Pty Ltd, the Group\u2019s interest in the Jimblebar mining operation is 85 per cent, which is consistent with the other respective contractual arrangements at Western <span class=\"_ _2\"></span>Australia Iron Ore.<span class=\"_ _39c\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSignificantInvestmentsInSubsidiariesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-710": {
   "value": "31  Investments accounted for using the equity method Significant interests in equity accounted investments of the Group are those with the most significant contribution to the Group\u2019s net profit or net assets. The Group\u2019s ownership interest in significant equity accounted investments results are listed in the table below. Significant associates  and joint ventures Country of incorporation/ principal place of business Associate or joint venture Principal activity Reporting date Ownership interest 2023  % 2022  % Compa\u00f1\u00eda Minera Antamina S.A. (Antamina) Peru Associate Copper and zinc mining 31 December 33.75 33.75 Samarco Minera\u00e7\u00e3o S.A. (Samarco) Brazil Joint venture Iron ore mining 31 December 50.00 50.00 Voting in relation to relevant activities in Antamina, determined to be the approval of the operating and capital budgets, does not require unanimous consent of all participants to the arrangement, therefore joint control does not exist. Instead, because the Group has the power to participate in the financial and operating policies of the investee, this investment is accounted for as an associate. Samarco is jointly owned by BHP Billiton Brasil Ltda (BHP Brasil) and Vale S.A. (Vale). As the Samarco entity has the rights to the assets and obligations to the liabilities relating to the joint arrangement and not its owners, this investment is accounted for as a joint venture. The Group is restricted in its ability to make dividend payments from its investments in associates and joint ventures as any such payments require the approval of all investors in the associates and joint ventures. The ownership interest at the Group\u2019s and the associates\u2019 or joint ventures\u2019 reporting dates are the same. When the annual financial reporting date is different to the Group\u2019s, financial information is obtained as at 30 June in order to report on an annual basis consistent with the Group\u2019s reporting date. The movement for the year in the Group\u2019s investments accounted for using the equity method is as follows: Year ended 30 June 2023  US$M Investment in associates Investment in joint ventures Total equity accounted investments At the beginning of the financial year 1,420  \u2212 1,420 Profit/(loss) from equity accounted investments, related impairments and expenses 1 379 215 594 Investment in equity accounted investments  149  \u2212 149 Dividends received from equity accounted investments (328)  \u2212 (328) Other1 \u2212 (215) (215) At the end of the financial year 1,620  \u2212 1,620 1  Represents financial impacts of Samarco dam failure in the Group\u2019s loss from equity accounted investments, related impairments and expenses. Refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 for further information. The following table summarises the financial information relating to each of the Group\u2019s significant equity accounted investments. BHP Brasil\u2019s 50 per cent portion of Samarco\u2019s commitments, for which BHP Brasil has no funding obligation, is US$500 million (2022: US$350 million). 2023  US$M Associates Joint ventures TotalAntamina Individually immaterial 1 Samarco 2 Individually immaterial Current assets 1,519 537 3 Non-current assets 5,670 5,739 Current liabilities (774) (11,167) 4 Non-current liabilities (1,944) (10,614) Net assets/(liabilities) \u2013 100% 4,471 (15,505) Net assets/(liabilities) \u2013 Group share  1,509 (7,753) Adjustments to net assets related to accounting policy adjustments (79) 291 5 Investment in Samarco  \u2212 516 6 Impairment of the carrying value of the investment in Samarco   \u2212 (1,041) 7 Additional share of Samarco losses  \u2212 6,034 8 Unrecognised losses  \u2212 1,953 9 Carrying amount of investments accounted for using the equity method 1,430 190  \u2212  \u2212  1,620 Revenue \u2013 100% 4,350 1,554 Profit/(loss) from Continuing operations \u2013 100%  1,571 (3,018)10 Share of profit/(loss) of equity accounted investments  530 (1,509) Adjustments to share of profit/(loss) related to accounting policy adjustments (79) 23 11 Impairment of the carrying value of the investment in Samarco   \u2212  \u2212 Additional share of Samarco losses  \u2212 452 Fair value change on forward exchange derivatives  \u2212 471 Unrecognised losses  \u2212 778 9 Profit/(loss) from equity accounted investments, related impairments and expenses 451 (72) 215  \u2212 594 Comprehensive income \u2013 100% 1,571 (3,018) Share of comprehensive income/(loss) \u2013 Group share in equity accounted investments 451 (72) 215  \u2212 594 Dividends received from equity accounted investments  327 1  \u2212  \u2212 328 2022  US$M Associates Joint ventures TotalAntamina Individually immaterial 1 Samarco 2 Individually immaterial Current assets 1,275 499 3 Non-current assets 5,293 5,717 Current liabilities (847) (10,830) 4 Non-current liabilities (1,851) (7,873) Net assets/(liabilities) \u2013 100% 3,870 (12,487) Net assets/(liabilities) \u2013 Group share  1,306 (6,244) Adjustments to net assets related to accounting policy adjustments  \u2212 268 5 Investment in Samarco  \u2212 516 6 Impairment of the carrying value of the investment in Samarco   \u2212 (1,041) 7 Additional share of Samarco losses  \u2212 5,326 Unrecognised losses  \u2212 1,175 9 Carrying amount of investments accounted for using the equity method 1,306 114  \u2212  \u2212 1,420 Revenue \u2013 100% 5,264 1,670 Profit/(loss) from Continuing operations \u2013 100%  2,133 (528) 10 Share of profit/(loss) of equity accounted investments  720 (276) 11 Impairment of the carrying value of the investment in Samarco   \u2212  \u2212 Additional share of Samarco losses  \u2212 290 Fair value change on forward exchange derivatives  \u2212 (81) Unrecognised losses  \u2212 (609) 9 Profit/(loss) from equity accounted investments, related impairments and expenses 720 (63) (676)  \u2212 (19) Comprehensive income \u2013 100% 2,133 (528) Share of comprehensive income/(loss) \u2013 Group share in equity accounted investments 720 (63) (676)  \u2212 (19) Dividends received from equity accounted investments  776 11  \u2212  \u2212 787 2021  US$M Associates Joint ventures TotalAntamina Cerrej\u00f3n Individually immaterial Samarco 2 Individually immaterial Revenue \u2013 100% 4,822 844 814 Profit/(loss) from Continuing operations \u2013 100%  1,847 (43) (2,202) 10 Share of profit/(loss) of equity accounted investments  623 (14) (1,076) 11 Impairment of the carrying value of the investment in Cerrej\u00f3n  \u2212 (466)  \u2212 Impairment of the carrying value of the investment in Samarco   \u2212  \u2212 (111) 7 Additional share of Samarco losses  \u2212  \u2212 85 Fair value change on forward exchange derivatives  \u2212  \u2212 136 Unrecognised losses  \u2212  \u2212 (24) 9 Profit/(loss) from equity accounted investments, related impairments  and expenses 623 (480) (68) (990)  \u2212 (915) Comprehensive income/(loss) \u2013 100% 1,847 (43) (2,202) Share of comprehensive income/(loss) \u2013 Group share in equity  accounted investments 623 (480) (68) (990)  \u2212 (915) Dividends received from equity accounted investments  714 13 10  \u2212  \u2212 737 1  The unrecognised share of gain for the period was US$76 million (2022: unrecognised share of gain for the period was US$16 million), which decreased the cumulative losses to US$141 million (2022: decrease to US$217 million). 2  Refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 for further information regarding the financial impact of the Samarco dam failure which occurred in November 2015 on BHP Brasil\u2019s share of Samarco\u2019s losses. 3  Includes cash and cash equivalents of US$138 million (2022: US$106 million). 4  Includes current financial liabilities (excluding trade and other payables and provisions) of US$7,154 million (2022: US$6,837 million). 5  Relates mainly to dividends declared by Samarco that remain unpaid at balance date and which, in accordance with the Group\u2019s accounting policy, are recognised when received not receivable. 6  Working capital funding provided to Samarco during the period is capitalised as part of the Group\u2019s investments in joint ventures and disclosed as an impairment included within the Samarco impairment expense line item. 7  In the year ended 30 June 2016 BHP Brasil adjusted its investment in Samarco to US$ nil (resulting from US$(655) million share of loss from Samarco and US$(525) million impairment). Additional cumulative impairment losses relating to working capital funding of US$(516) million have also been recognised. 8  BHP Brasil has recognised accumulated additional share of Samarco losses of US$(6,034) million resulting from US$(4,795) million provisions relating to the Samarco dam failure, including US$(1,239) million recognised as net finance costs. 9  Share of Samarco\u2019s losses for which BHP Brasil does not have an obligation to fund. 10  Includes depreciation and amortisation of US$144 million (2022: US$205 million; 2021: US$154 million), interest income of US$42 million (2022: US$19 million; 2021: US$1 million), interest expense of US$1,384 million (2022: US$628 million; 2021: US$492 million) and income tax (expense)/benefit of US$(213) million (2022: US$(7) million; 2021: US$(303) million). 11  Includes accounting policy adjustments mainly related to the removal of foreign exchange gains on excluded dividends payable. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfJointVenturesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-646": {
   "value": "31  Investments accounted for using the equity method Significant interests in equity accounted investments of the Group are those with the most significant contribution to the Group\u2019s net profit or net assets. The Group\u2019s ownership interest in significant equity accounted investments results are listed in the table below. Significant associates  and joint ventures Country of incorporation/ principal place of business Associate or joint venture Principal activity Reporting date Ownership interest 2023  % 2022  % Compa\u00f1\u00eda Minera Antamina S.A. (Antamina) Peru Associate Copper and zinc mining 31 December 33.75 33.75 Samarco Minera\u00e7\u00e3o S.A. (Samarco) Brazil Joint venture Iron ore mining 31 December 50.00 50.00 Voting in relation to relevant activities in Antamina, determined to be the approval of the operating and capital budgets, does not require unanimous consent of all participants to the arrangement, therefore joint control does not exist. Instead, because the Group has the power to participate in the financial and operating policies of the investee, this investment is accounted for as an associate. Samarco is jointly owned by BHP Billiton Brasil Ltda (BHP Brasil) and Vale S.A. (Vale). As the Samarco entity has the rights to the assets and obligations to the liabilities relating to the joint arrangement and not its owners, this investment is accounted for as a joint venture. The Group is restricted in its ability to make dividend payments from its investments in associates and joint ventures as any such payments require the approval of all investors in the associates and joint ventures. The ownership interest at the Group\u2019s and the associates\u2019 or joint ventures\u2019 reporting dates are the same. When the annual financial reporting date is different to the Group\u2019s, financial information is obtained as at 30 June in order to report on an annual basis consistent with the Group\u2019s reporting date. The movement for the year in the Group\u2019s investments accounted for using the equity method is as follows: Year ended 30 June 2023  US$M Investment in associates Investment in joint ventures Total equity accounted investments At the beginning of the financial year 1,420  \u2212 1,420 Profit/(loss) from equity accounted investments, related impairments and expenses 1 379 215 594 Investment in equity accounted investments  149  \u2212 149 Dividends received from equity accounted investments (328)  \u2212 (328) Other1 \u2212 (215) (215) At the end of the financial year 1,620  \u2212 1,620 1  Represents financial impacts of Samarco dam failure in the Group\u2019s loss from equity accounted investments, related impairments and expenses. Refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 for further information. The following table summarises the financial information relating to each of the Group\u2019s significant equity accounted investments. BHP Brasil\u2019s 50 per cent portion of Samarco\u2019s commitments, for which BHP Brasil has no funding obligation, is US$500 million (2022: US$350 million). 2023  US$M Associates Joint ventures TotalAntamina Individually immaterial 1 Samarco 2 Individually immaterial Current assets 1,519 537 3 Non-current assets 5,670 5,739 Current liabilities (774) (11,167) 4 Non-current liabilities (1,944) (10,614) Net assets/(liabilities) \u2013 100% 4,471 (15,505) Net assets/(liabilities) \u2013 Group share  1,509 (7,753) Adjustments to net assets related to accounting policy adjustments (79) 291 5 Investment in Samarco  \u2212 516 6 Impairment of the carrying value of the investment in Samarco   \u2212 (1,041) 7 Additional share of Samarco losses  \u2212 6,034 8 Unrecognised losses  \u2212 1,953 9 Carrying amount of investments accounted for using the equity method 1,430 190  \u2212  \u2212  1,620 Revenue \u2013 100% 4,350 1,554 Profit/(loss) from Continuing operations \u2013 100%  1,571 (3,018)10 Share of profit/(loss) of equity accounted investments  530 (1,509) Adjustments to share of profit/(loss) related to accounting policy adjustments (79) 23 11 Impairment of the carrying value of the investment in Samarco   \u2212  \u2212 Additional share of Samarco losses  \u2212 452 Fair value change on forward exchange derivatives  \u2212 471 Unrecognised losses  \u2212 778 9 Profit/(loss) from equity accounted investments, related impairments and expenses 451 (72) 215  \u2212 594 Comprehensive income \u2013 100% 1,571 (3,018) Share of comprehensive income/(loss) \u2013 Group share in equity accounted investments 451 (72) 215  \u2212 594 Dividends received from equity accounted investments  327 1  \u2212  \u2212 328 2022  US$M Associates Joint ventures Individually immaterial 1 Samarco 2 Individually immaterial Current assets 1,275 499 3 Non-current assets 5,293 5,717 Current liabilities (847) (10,830) 4 Non-current liabilities (1,851) (7,873) Net assets/(liabilities) \u2013 100% 3,870 (12,487) Net assets/(liabilities) \u2013 Group share  1,306 (6,244) Adjustments to net assets related to accounting policy adjustments  \u2212 268 5 Investment in Samarco  \u2212 516 6 Impairment of the carrying value of the investment in Samarco   \u2212 (1,041) 7 Additional share of Samarco losses  \u2212 5,326 Unrecognised losses  \u2212 1,175 9 Carrying amount of investments accounted for using the equity method 1,306 114  \u2212  \u2212 1,420 Revenue \u2013 100% 5,264 1,670 Profit/(loss) from Continuing operations \u2013 100%  2,133 (528) 10 Share of profit/(loss) of equity accounted investments  720 (276) 11 Impairment of the carrying value of the investment in Samarco   \u2212  \u2212 Additional share of Samarco losses  \u2212 290 Fair value change on forward exchange derivatives  \u2212 (81) Unrecognised losses  \u2212 (609) 9 Profit/(loss) from equity accounted investments, related impairments and expenses 720 (63) (676)  \u2212 (19) Comprehensive income \u2013 100% 2,133 (528) Share of comprehensive income/(loss) \u2013 Group share in equity accounted investments 720 (63) (676)  \u2212 (19) Dividends received from equity accounted investments  776 11  \u2212  \u2212 787 2021  US$M Associates Joint ventures Antamina Cerrej\u00f3n Individually immaterial Samarco 2 Individually immaterial Revenue \u2013 100% 4,822 844 814 Profit/(loss) from Continuing operations \u2013 100%  1,847 (43) (2,202) 10 Share of profit/(loss) of equity accounted investments  623 (14) (1,076) 11 Impairment of the carrying value of the investment in Cerrej\u00f3n  \u2212 (466)  \u2212 Impairment of the carrying value of the investment in Samarco   \u2212  \u2212 (111) 7 Additional share of Samarco losses  \u2212  \u2212 85 Fair value change on forward exchange derivatives  \u2212  \u2212 136 Unrecognised losses  \u2212  \u2212 (24) 9 Profit/(loss) from equity accounted investments, related impairments  and expenses 623 (480) (68) (990)  \u2212 (915) Comprehensive income/(loss) \u2013 100% 1,847 (43) (2,202) Share of comprehensive income/(loss) \u2013 Group share in equity  accounted investments 623 (480) (68) (990)  \u2212 (915) Dividends received from equity accounted investments  714 13 10  \u2212  \u2212 737 1  The unrecognised share of gain for the period was US$76 million (2022: unrecognised share of gain for the period was US$16 million), which decreased the cumulative losses to US$141 million (2022: decrease to US$217 million). 2  Refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 for further information regarding the financial impact of the Samarco dam failure which occurred in November 2015 on BHP Brasil\u2019s share of Samarco\u2019s losses. 3  Includes cash and cash equivalents of US$138 million (2022: US$106 million). 4  Includes current financial liabilities (excluding trade and other payables and provisions) of US$7,154 million (2022: US$6,837 million). 5  Relates mainly to dividends declared by Samarco that remain unpaid at balance date and which, in accordance with the Group\u2019s accounting policy, are recognised when received not receivable. 6  Working capital funding provided to Samarco during the period is capitalised as part of the Group\u2019s investments in joint ventures and disclosed as an impairment included within the Samarco impairment expense line item. 7  In the year ended 30 June 2016 BHP Brasil adjusted its investment in Samarco to US$ nil (resulting from US$(655) million share of loss from Samarco and US$(525) million impairment). Additional cumulative impairment losses relating to working capital funding of US$(516) million have also been recognised. 8  BHP Brasil has recognised accumulated additional share of Samarco losses of US$(6,034) million resulting from US$(4,795) million provisions relating to the Samarco dam failure, including US$(1,239) million recognised as net finance costs. 9  Share of Samarco\u2019s losses for which BHP Brasil does not have an obligation to fund. 10  Includes depreciation and amortisation of US$144 million (2022: US$205 million; 2021: US$154 million), interest income of US$42 million (2022: US$19 million; 2021: US$1 million), interest expense of US$1,384 million (2022: US$628 million; 2021: US$492 million) and income tax (expense)/benefit of US$(213) million (2022: US$(7) million; 2021: US$(303) million). 11  Includes accounting policy adjustments mainly related to the removal of foreign exchange gains on excluded dividends payable. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInvestmentsAccountedForUsingEquityMethodExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-692": {
   "value": "31  Investments accounted for using the equity method Significant interests in equity accounted investments of the Group are those with the most significant contribution to the Group\u2019s net profit or net assets. The Group\u2019s ownership interest in significant equity accounted investments results are listed in the table below. Significant associates  and joint ventures Country of incorporation/ principal place of business Associate or joint venture Principal activity Reporting date Ownership interest 2023  % 2022  % Compa\u00f1\u00eda Minera Antamina S.A. (Antamina) Peru Associate Copper and zinc mining 31 December 33.75 33.75 Samarco Minera\u00e7\u00e3o S.A. (Samarco) Brazil Joint venture Iron ore mining 31 December 50.00 50.00 Voting in relation to relevant activities in Antamina, determined to be the approval of the operating and capital budgets, does not require unanimous consent of all participants to the arrangement, therefore joint control does not exist. Instead, because the Group has the power to participate in the financial and operating policies of the investee, this investment is accounted for as an associate. Samarco is jointly owned by BHP Billiton Brasil Ltda (BHP Brasil) and Vale S.A. (Vale). As the Samarco entity has the rights to the assets and obligations to the liabilities relating to the joint arrangement and not its owners, this investment is accounted for as a joint venture. The Group is restricted in its ability to make dividend payments from its investments in associates and joint ventures as any such payments require the approval of all investors in the associates and joint ventures. The ownership interest at the Group\u2019s and the associates\u2019 or joint ventures\u2019 reporting dates are the same. When the annual financial reporting date is different to the Group\u2019s, financial information is obtained as at 30 June in order to report on an annual basis consistent with the Group\u2019s reporting date. The movement for the year in the Group\u2019s investments accounted for using the equity method is as follows: Year ended 30 June 2023  US$M Investment in associates Investment in joint ventures Total equity accounted investments At the beginning of the financial year 1,420  \u2212 1,420 Profit/(loss) from equity accounted investments, related impairments and expenses 1 379 215 594 Investment in equity accounted investments  149  \u2212 149 Dividends received from equity accounted investments (328)  \u2212 (328) Other1 \u2212 (215) (215) At the end of the financial year 1,620  \u2212 1,620 1  Represents financial impacts of Samarco dam failure in the Group\u2019s loss from equity accounted investments, related impairments and expenses. Refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 for further information. The following table summarises the financial information relating to each of the Group\u2019s significant equity accounted investments. BHP Brasil\u2019s 50 per cent portion of Samarco\u2019s commitments, for which BHP Brasil has no funding obligation, is US$500 million (2022: US$350 million). 2023  US$M Associates Joint ventures TotalAntamina Individually immaterial 1 Samarco 2 Individually immaterial Current assets 1,519 537 3 Non-current assets 5,670 5,739 Current liabilities (774) (11,167) 4 Non-current liabilities (1,944) (10,614) Net assets/(liabilities) \u2013 100% 4,471 (15,505) Net assets/(liabilities) \u2013 Group share  1,509 (7,753) Adjustments to net assets related to accounting policy adjustments (79) 291 5 Investment in Samarco  \u2212 516 6 Impairment of the carrying value of the investment in Samarco   \u2212 (1,041) 7 Additional share of Samarco losses  \u2212 6,034 8 Unrecognised losses  \u2212 1,953 9 Carrying amount of investments accounted for using the equity method 1,430 190  \u2212  \u2212  1,620 Revenue \u2013 100% 4,350 1,554 Profit/(loss) from Continuing operations \u2013 100%  1,571 (3,018)10 Share of profit/(loss) of equity accounted investments  530 (1,509) Adjustments to share of profit/(loss) related to accounting policy adjustments (79) 23 11 Impairment of the carrying value of the investment in Samarco   \u2212  \u2212 Additional share of Samarco losses  \u2212 452 Fair value change on forward exchange derivatives  \u2212 471 Unrecognised losses  \u2212 778 9 Profit/(loss) from equity accounted investments, related impairments and expenses 451 (72) 215  \u2212 594 Comprehensive income \u2013 100% 1,571 (3,018) Share of comprehensive income/(loss) \u2013 Group share in equity accounted investments 451 (72) 215  \u2212 594 Dividends received from equity accounted investments  327 1  \u2212  \u2212 328 2022  US$M Associates Joint ventures TotalAntamina Individually immaterial 1 Samarco 2 Individually immaterial Current assets 1,275 499 3 Non-current assets 5,293 5,717 Current liabilities (847) (10,830) 4 Non-current liabilities (1,851) (7,873) Net assets/(liabilities) \u2013 100% 3,870 (12,487) Net assets/(liabilities) \u2013 Group share  1,306 (6,244) Adjustments to net assets related to accounting policy adjustments  \u2212 268 5 Investment in Samarco  \u2212 516 6 Impairment of the carrying value of the investment in Samarco   \u2212 (1,041) 7 Additional share of Samarco losses  \u2212 5,326 Unrecognised losses  \u2212 1,175 9 Carrying amount of investments accounted for using the equity method 1,306 114  \u2212  \u2212 1,420 Revenue \u2013 100% 5,264 1,670 Profit/(loss) from Continuing operations \u2013 100%  2,133 (528) 10 Share of profit/(loss) of equity accounted investments  720 (276) 11 Impairment of the carrying value of the investment in Samarco   \u2212  \u2212 Additional share of Samarco losses  \u2212 290 Fair value change on forward exchange derivatives  \u2212 (81) Unrecognised losses  \u2212 (609) 9 Profit/(loss) from equity accounted investments, related impairments and expenses 720 (63) (676)  \u2212 (19) Comprehensive income \u2013 100% 2,133 (528) Share of comprehensive income/(loss) \u2013 Group share in equity accounted investments 720 (63) (676)  \u2212 (19) Dividends received from equity accounted investments  776 11  \u2212  \u2212 787 2021  US$M Associates Joint ventures TotalAntamina Cerrej\u00f3n Individually immaterial Samarco 2 Individually immaterial Revenue \u2013 100% 4,822 844 814 Profit/(loss) from Continuing operations \u2013 100%  1,847 (43) (2,202) 10 Share of profit/(loss) of equity accounted investments  623 (14) (1,076) 11 Impairment of the carrying value of the investment in Cerrej\u00f3n  \u2212 (466)  \u2212 Impairment of the carrying value of the investment in Samarco   \u2212  \u2212 (111) 7 Additional share of Samarco losses  \u2212  \u2212 85 Fair value change on forward exchange derivatives  \u2212  \u2212 136 Unrecognised losses  \u2212  \u2212 (24) 9 Profit/(loss) from equity accounted investments, related impairments  and expenses 623 (480) (68) (990)  \u2212 (915) Comprehensive income/(loss) \u2013 100% 1,847 (43) (2,202) Share of comprehensive income/(loss) \u2013 Group share in equity  accounted investments 623 (480) (68) (990)  \u2212 (915) Dividends received from equity accounted investments  714 13 10  \u2212  \u2212 737 1  The unrecognised share of gain for the period was US$76 million (2022: unrecognised share of gain for the period was US$16 million), which decreased the cumulative losses to US$141 million (2022: decrease to US$217 million). 2  Refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 for further information regarding the financial impact of the Samarco dam failure which occurred in November 2015 on BHP Brasil\u2019s share of Samarco\u2019s losses. 3  Includes cash and cash equivalents of US$138 million (2022: US$106 million). 4  Includes current financial liabilities (excluding trade and other payables and provisions) of US$7,154 million (2022: US$6,837 million). 5  Relates mainly to dividends declared by Samarco that remain unpaid at balance date and which, in accordance with the Group\u2019s accounting policy, are recognised when received not receivable. 6  Working capital funding provided to Samarco during the period is capitalised as part of the Group\u2019s investments in joint ventures and disclosed as an impairment included within the Samarco impairment expense line item. 7  In the year ended 30 June 2016 BHP Brasil adjusted its investment in Samarco to US$ nil (resulting from US$(655) million share of loss from Samarco and US$(525) million impairment). Additional cumulative impairment losses relating to working capital funding of US$(516) million have also been recognised. 8  BHP Brasil has recognised accumulated additional share of Samarco losses of US$(6,034) million resulting from US$(4,795) million provisions relating to the Samarco dam failure, including US$(1,239) million recognised as net finance costs. 9  Share of Samarco\u2019s losses for which BHP Brasil does not have an obligation to fund. 10  Includes depreciation and amortisation of US$144 million (2022: US$205 million; 2021: US$154 million), interest income of US$42 million (2022: US$19 million; 2021: US$1 million), interest expense of US$1,384 million (2022: US$628 million; 2021: US$492 million) and income tax (expense)/benefit of US$(213) million (2022: US$(7) million; 2021: US$(303) million). 11  Includes accounting policy adjustments mainly related to the removal of foreign exchange gains on excluded dividends payable. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSignificantInvestmentsInAssociatesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-724": {
   "value": "The following table summarises the financial information relating to each of the Group\u2019s significant equity accounted investments. BHP Brasil\u2019s 50 per cent portion of Samarco\u2019s commitments, for which BHP Brasil has no funding obligation, is US$500 million (2022: US$350 million). 2023  US$M Associates Joint ventures TotalAntamina Individually immaterial 1 Samarco 2 Individually immaterial Current assets 1,519 537 3 Non-current assets 5,670 5,739 Current liabilities (774) (11,167) 4 Non-current liabilities (1,944) (10,614) Net assets/(liabilities) \u2013 100% 4,471 (15,505) Net assets/(liabilities) \u2013 Group share  1,509 (7,753) Adjustments to net assets related to accounting policy adjustments (79) 291 5 Investment in Samarco  \u2212 516 6 Impairment of the carrying value of the investment in Samarco   \u2212 (1,041) 7 Additional share of Samarco losses  \u2212 6,034 8 Unrecognised losses  \u2212 1,953 9 Carrying amount of investments accounted for using the equity method 1,430 190  \u2212  \u2212  1,620 Revenue \u2013 100% 4,350 1,554 Profit/(loss) from Continuing operations \u2013 100%  1,571 (3,018)10 Share of profit/(loss) of equity accounted investments  530 (1,509) Adjustments to share of profit/(loss) related to accounting policy adjustments (79) 23 11 Impairment of the carrying value of the investment in Samarco   \u2212  \u2212 Additional share of Samarco losses  \u2212 452 Fair value change on forward exchange derivatives  \u2212 471 Unrecognised losses  \u2212 778 9 Profit/(loss) from equity accounted investments, related impairments and expenses 451 (72) 215  \u2212 594 Comprehensive income \u2013 100% 1,571 (3,018) Share of comprehensive income/(loss) \u2013 Group share in equity accounted investments 451 (72) 215  \u2212 594 Dividends received from equity accounted investments  327 1  \u2212  \u2212 328 2022  US$M Associates Joint ventures TotalAntamina Individually immaterial 1 Samarco 2 Individually immaterial Current assets 1,275 499 3 Non-current assets 5,293 5,717 Current liabilities (847) (10,830) 4 Non-current liabilities (1,851) (7,873) Net assets/(liabilities) \u2013 100% 3,870 (12,487) Net assets/(liabilities) \u2013 Group share  1,306 (6,244) Adjustments to net assets related to accounting policy adjustments  \u2212 268 5 Investment in Samarco  \u2212 516 6 Impairment of the carrying value of the investment in Samarco   \u2212 (1,041) 7 Additional share of Samarco losses  \u2212 5,326 Unrecognised losses  \u2212 1,175 9 Carrying amount of investments accounted for using the equity method 1,306 114  \u2212  \u2212 1,420 Revenue \u2013 100% 5,264 1,670 Profit/(loss) from Continuing operations \u2013 100%  2,133 (528) 10 Share of profit/(loss) of equity accounted investments  720 (276) 11 Impairment of the carrying value of the investment in Samarco   \u2212  \u2212 Additional share of Samarco losses  \u2212 290 Fair value change on forward exchange derivatives  \u2212 (81) Unrecognised losses  \u2212 (609) 9 Profit/(loss) from equity accounted investments, related impairments and expenses 720 (63) (676)  \u2212 (19) Comprehensive income \u2013 100% 2,133 (528) Share of comprehensive income/(loss) \u2013 Group share in equity accounted investments 720 (63) (676)  \u2212 (19) Dividends received from equity accounted investments  776 11  \u2212  \u2212 787 2021  US$M Associates Joint ventures TotalAntamina Cerrej\u00f3n Individually immaterial Samarco 2 Individually immaterial Revenue \u2013 100% 4,822 844 814 Profit/(loss) from Continuing operations \u2013 100%  1,847 (43) (2,202) 10 Share of profit/(loss) of equity accounted investments  623 (14) (1,076) 11 Impairment of the carrying value of the investment in Cerrej\u00f3n  \u2212 (466)  \u2212 Impairment of the carrying value of the investment in Samarco   \u2212  \u2212 (111) 7 Additional share of Samarco losses  \u2212  \u2212 85 Fair value change on forward exchange derivatives  \u2212  \u2212 136 Unrecognised losses  \u2212  \u2212 (24) 9 Profit/(loss) from equity accounted investments, related impairments  and expenses 623 (480) (68) (990)  \u2212 (915) Comprehensive income/(loss) \u2013 100% 1,847 (43) (2,202) Share of comprehensive income/(loss) \u2013 Group share in equity  accounted investments 623 (480) (68) (990)  \u2212 (915) Dividends received from equity accounted investments  714 13 10  \u2212  \u2212 737 1  The unrecognised share of gain for the period was US$76 million (2022: unrecognised share of gain for the period was US$16 million), which decreased the cumulative losses to US$141 million (2022: decrease to US$217 million). 2  Refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 for further information regarding the financial impact of the Samarco dam failure which occurred in November 2015 on BHP Brasil\u2019s share of Samarco\u2019s losses. 3  Includes cash and cash equivalents of US$138 million (2022: US$106 million). 4  Includes current financial liabilities (excluding trade and other payables and provisions) of US$7,154 million (2022: US$6,837 million). 5  Relates mainly to dividends declared by Samarco that remain unpaid at balance date and which, in accordance with the Group\u2019s accounting policy, are recognised when received not receivable. 6  Working capital funding provided to Samarco during the period is capitalised as part of the Group\u2019s investments in joint ventures and disclosed as an impairment included within the Samarco impairment expense line item. 7  In the year ended 30 June 2016 BHP Brasil adjusted its investment in Samarco to US$ nil (resulting from US$(655) million share of loss from Samarco and US$(525) million impairment). Additional cumulative impairment losses relating to working capital funding of US$(516) million have also been recognised. 8  BHP Brasil has recognised accumulated additional share of Samarco losses of US$(6,034) million resulting from US$(4,795) million provisions relating to the Samarco dam failure, including US$(1,239) million recognised as net finance costs. 9  Share of Samarco\u2019s losses for which BHP Brasil does not have an obligation to fund. 10  Includes depreciation and amortisation of US$144 million (2022: US$205 million; 2021: US$154 million), interest income of US$42 million (2022: US$19 million; 2021: US$1 million), interest expense of US$1,384 million (2022: US$628 million; 2021: US$492 million) and income tax (expense)/benefit of US$(213) million (2022: US$(7) million; 2021: US$(303) million). 11  Includes accounting policy adjustments mainly related to the removal of foreign exchange gains on excluded dividends payable. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfReconciliationOfSummarisedFinancialInformationOfJointVentureAccountedForUsingEquityMethodToCarryingAmountOfInterestInJointVentureExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-720": {
   "value": "The following table summarises the financial information relating to each of the Group\u2019s significant equity accounted investments. BHP Brasil\u2019s 50 per cent portion of Samarco\u2019s commitments, for which BHP Brasil has no funding obligation, is US$500 million (2022: US$350 million). 2023  US$M Associates Joint ventures TotalAntamina Individually immaterial 1 Samarco 2 Individually immaterial Current assets 1,519 537 3 Non-current assets 5,670 5,739 Current liabilities (774) (11,167) 4 Non-current liabilities (1,944) (10,614) Net assets/(liabilities) \u2013 100% 4,471 (15,505) Net assets/(liabilities) \u2013 Group share  1,509 (7,753) Adjustments to net assets related to accounting policy adjustments (79) 291 5 Investment in Samarco  \u2212 516 6 Impairment of the carrying value of the investment in Samarco   \u2212 (1,041) 7 Additional share of Samarco losses  \u2212 6,034 8 Unrecognised losses  \u2212 1,953 9 Carrying amount of investments accounted for using the equity method 1,430 190  \u2212  \u2212  1,620 Revenue \u2013 100% 4,350 1,554 Profit/(loss) from Continuing operations \u2013 100%  1,571 (3,018)10 Share of profit/(loss) of equity accounted investments  530 (1,509) Adjustments to share of profit/(loss) related to accounting policy adjustments (79) 23 11 Impairment of the carrying value of the investment in Samarco   \u2212  \u2212 Additional share of Samarco losses  \u2212 452 Fair value change on forward exchange derivatives  \u2212 471 Unrecognised losses  \u2212 778 9 Profit/(loss) from equity accounted investments, related impairments and expenses 451 (72) 215  \u2212 594 Comprehensive income \u2013 100% 1,571 (3,018) Share of comprehensive income/(loss) \u2013 Group share in equity accounted investments 451 (72) 215  \u2212 594 Dividends received from equity accounted investments  327 1  \u2212  \u2212 328 2022  US$M Associates Joint ventures TotalAntamina Individually immaterial 1 Samarco 2 Individually immaterial Current assets 1,275 499 3 Non-current assets 5,293 5,717 Current liabilities (847) (10,830) 4 Non-current liabilities (1,851) (7,873) Net assets/(liabilities) \u2013 100% 3,870 (12,487) Net assets/(liabilities) \u2013 Group share  1,306 (6,244) Adjustments to net assets related to accounting policy adjustments  \u2212 268 5 Investment in Samarco  \u2212 516 6 Impairment of the carrying value of the investment in Samarco   \u2212 (1,041) 7 Additional share of Samarco losses  \u2212 5,326 Unrecognised losses  \u2212 1,175 9 Carrying amount of investments accounted for using the equity method 1,306 114  \u2212  \u2212 1,420 Revenue \u2013 100% 5,264 1,670 Profit/(loss) from Continuing operations \u2013 100%  2,133 (528) 10 Share of profit/(loss) of equity accounted investments  720 (276) 11 Impairment of the carrying value of the investment in Samarco   \u2212  \u2212 Additional share of Samarco losses  \u2212 290 Fair value change on forward exchange derivatives  \u2212 (81) Unrecognised losses  \u2212 (609) 9 Profit/(loss) from equity accounted investments, related impairments and expenses 720 (63) (676)  \u2212 (19) Comprehensive income \u2013 100% 2,133 (528) Share of comprehensive income/(loss) \u2013 Group share in equity accounted investments 720 (63) (676)  \u2212 (19) Dividends received from equity accounted investments  776 11  \u2212  \u2212 787 2021  US$M Associates Joint ventures TotalAntamina Cerrej\u00f3n Individually immaterial Samarco 2 Individually immaterial Revenue \u2013 100% 4,822 844 814 Profit/(loss) from Continuing operations \u2013 100%  1,847 (43) (2,202) 10 Share of profit/(loss) of equity accounted investments  623 (14) (1,076) 11 Impairment of the carrying value of the investment in Cerrej\u00f3n  \u2212 (466)  \u2212 Impairment of the carrying value of the investment in Samarco   \u2212  \u2212 (111) 7 Additional share of Samarco losses  \u2212  \u2212 85 Fair value change on forward exchange derivatives  \u2212  \u2212 136 Unrecognised losses  \u2212  \u2212 (24) 9 Profit/(loss) from equity accounted investments, related impairments  and expenses 623 (480) (68) (990)  \u2212 (915) Comprehensive income/(loss) \u2013 100% 1,847 (43) (2,202) Share of comprehensive income/(loss) \u2013 Group share in equity  accounted investments 623 (480) (68) (990)  \u2212 (915) Dividends received from equity accounted investments  714 13 10  \u2212  \u2212 737 1  The unrecognised share of gain for the period was US$76 million (2022: unrecognised share of gain for the period was US$16 million), which decreased the cumulative losses to US$141 million (2022: decrease to US$217 million). 2  Refer to note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 for further information regarding the financial impact of the Samarco dam failure which occurred in November 2015 on BHP Brasil\u2019s share of Samarco\u2019s losses. 3  Includes cash and cash equivalents of US$138 million (2022: US$106 million). 4  Includes current financial liabilities (excluding trade and other payables and provisions) of US$7,154 million (2022: US$6,837 million). 5  Relates mainly to dividends declared by Samarco that remain unpaid at balance date and which, in accordance with the Group\u2019s accounting policy, are recognised when received not receivable. 6  Working capital funding provided to Samarco during the period is capitalised as part of the Group\u2019s investments in joint ventures and disclosed as an impairment included within the Samarco impairment expense line item. 7  In the year ended 30 June 2016 BHP Brasil adjusted its investment in Samarco to US$ nil (resulting from US$(655) million share of loss from Samarco and US$(525) million impairment). Additional cumulative impairment losses relating to working capital funding of US$(516) million have also been recognised. 8  BHP Brasil has recognised accumulated additional share of Samarco losses of US$(6,034) million resulting from US$(4,795) million provisions relating to the Samarco dam failure, including US$(1,239) million recognised as net finance costs. 9  Share of Samarco\u2019s losses for which BHP Brasil does not have an obligation to fund. 10  Includes depreciation and amortisation of US$144 million (2022: US$205 million; 2021: US$154 million), interest income of US$42 million (2022: US$19 million; 2021: US$1 million), interest expense of US$1,384 million (2022: US$628 million; 2021: US$492 million) and income tax (expense)/benefit of US$(213) million (2022: US$(7) million; 2021: US$(303) million). 11  Includes accounting policy adjustments mainly related to the removal of foreign exchange gains on excluded dividends payable. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfReconciliationOfSummarisedFinancialInformationOfAssociateAccountedForUsingEquityMethodToCarryingAmountOfInterestInAssociateExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-647": {
   "value": "32  Interests in joint operations Significant joint operations of the Group are those with the most significant contributions to the Group\u2019s net profit or net assets. The Group\u2019s interest in the joint operations results are listed in the table below. Significant joint operations  Country of operation Principal activity Group\u2019s interest 2023  % 2022  % Mt Goldsworthy1 Australia Iron ore mining 85 85 Mt Newman1 Australia Iron ore mining 85 85 Yandi1 Australia Iron ore mining  85 85 Central Queensland Coal Associates Australia Coal mining  50 50 1  These contractual arrangements are controlled by the Group and do not meet the definition of joint operations. However, as they are formed by contractual arrangement and are not entities, the Group recognises its share of assets, liabilities, revenue and expenses arising from these arrangements. Assets held in joint operations subject to significant restrictions are as follows: Group\u2019s share 2023  US$M 2022  US$M Current assets 1,561 1,928 Non-current assets 26,370 26,256 Total assets1 27,931 28,184 1  While the Group is unrestricted in its ability to sell a share of its interest in these joint operations, it does not have the right to sell individual assets that are used in these joint operations without the unanimous consent of the other participants. The assets in these joint operations are also restricted to the extent that they are only available to be used by the joint operation itself and not by other operations of the Group. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfJointOperationsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-648": {
   "value": "33  Related party transactions The Group\u2019s related parties are predominantly subsidiaries, associates and joint ventures, and key management personnel of the Group. Disclosures relating to key management personnel are set out in note 25 \u2018Key management personnel\u2019. Transactions between each parent company and its subsidiaries are eliminated on consolidation and are not disclosed in this note. \u2013  All transactions to/from related parties are made at arm\u2019s length, i.e. at normal market prices and rates and on normal commercial terms. \u2013  Outstanding balances at year-end are unsecured and settlement occurs in cash. Loan amounts owing from related parties represent secured loans made to associates and joint ventures under co-funding arrangements. Such loans are made on an arm\u2019s length basis. \u2013  No guarantees are provided or received for any related party receivables or payables. \u2013  No provision for expected credit losses has been recognised in relation to any outstanding balances and no expense has been recognised in respect of expected credit losses due from related parties. \u2013  There were no other related party transactions in the year ended 30 June 2023 (2022: US$ nil), other than those with post-employment benefit plans for the benefit of Group employees. These are shown in note 27 \u2018Employee benefits, restructuring and post-retirement employee benefits provisions\u2019. \u2013  Related party transactions with Samarco are described in note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 . Further disclosures related to related party transactions are as follows: Transactions with related parties Joint ventures Associates 2023  US$M 2022  US$M 2023  US$M 2022  US$M Sales of goods/services   \u2212  \u2212  \u2212  \u2212 Purchases of goods/services   \u2212  \u2212 1,589.094 1,852.132 Interest income  \u2212  \u2212  \u2212 0.398 Interest expense  \u2212  \u2212  \u2212 0.005 Dividends received  \u2212  \u2212 327.679 787.208 Net loans made to/(repayments from) related parties  \u2212  \u2212  \u2212 (23.554) Outstanding balances with related parties Joint ventures Associates 2023  US$M 2022  US$M 2023  US$M 2022  US$M Trade amounts owing to related parties  \u2013  \u2212 246.239 351.607 Loan amounts owing to related parties  \u2212  \u2212  \u2212 \u2212 Trade amounts owing from related parties \u2013  \u2212 6.730 6.855 Loan amounts owing from related parties  \u2212  \u2212  \u2212 \u2212 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTransactionsBetweenRelatedPartiesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-693": {
   "value": "33  Related party transactions The Group\u2019s related parties are predominantly subsidiaries, associates and joint ventures, and key management personnel of the Group. Disclosures relating to key management personnel are set out in note 25 \u2018Key management personnel\u2019. Transactions between each parent company and its subsidiaries are eliminated on consolidation and are not disclosed in this note. \u2013  All transactions to/from related parties are made at arm\u2019s length, i.e. at normal market prices and rates and on normal commercial terms. \u2013  Outstanding balances at year-end are unsecured and settlement occurs in cash. Loan amounts owing from related parties represent secured loans made to associates and joint ventures under co-funding arrangements. Such loans are made on an arm\u2019s length basis. \u2013  No guarantees are provided or received for any related party receivables or payables. \u2013  No provision for expected credit losses has been recognised in relation to any outstanding balances and no expense has been recognised in respect of expected credit losses due from related parties. \u2013  There were no other related party transactions in the year ended 30 June 2023 (2022: US$ nil), other than those with post-employment benefit plans for the benefit of Group employees. These are shown in note 27 \u2018Employee benefits, restructuring and post-retirement employee benefits provisions\u2019. \u2013  Related party transactions with Samarco are described in note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 . Further disclosures related to related party transactions are as follows: Transactions with related parties Joint ventures Associates 2023  US$M 2022  US$M 2023  US$M 2022  US$M Sales of goods/services   \u2212  \u2212  \u2212  \u2212 Purchases of goods/services   \u2212  \u2212 1,589.094 1,852.132 Interest income  \u2212  \u2212  \u2212 0.398 Interest expense  \u2212  \u2212  \u2212 0.005 Dividends received  \u2212  \u2212 327.679 787.208 Net loans made to/(repayments from) related parties  \u2212  \u2212  \u2212 (23.554) Outstanding balances with related parties Joint ventures Associates 2023  US$M 2022  US$M 2023  US$M 2022  US$M Trade amounts owing to related parties  \u2013  \u2212 246.239 351.607 Loan amounts owing to related parties  \u2212  \u2212  \u2212 \u2212 Trade amounts owing from related parties \u2013  \u2212 6.730 6.855 Loan amounts owing from related parties  \u2212  \u2212  \u2212 \u2212 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRelatedPartyExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-753": {
   "value": "The Group\u2019s related parties are predominantly subsidiaries, associates and joint ventures, and key management personnel of the Group. Disclosures relating to key management personnel are set out in note 25 \u2018Key management personnel\u2019. Transactions between each parent company and its subsidiaries are eliminated on consolidation and are not disclosed in this note. \u2013  All transactions to/from related parties are made at arm\u2019s length, i.e. at normal market prices and rates and on normal commercial terms. \u2013  Outstanding balances at year-end are unsecured and settlement occurs in cash. Loan amounts owing from related parties represent secured loans made to associates and joint ventures under co-funding arrangements. Such loans are made on an arm\u2019s length basis. \u2013  No guarantees are provided or received for any related party receivables or payables. \u2013  No provision for expected credit losses has been recognised in relation to any outstanding balances and no expense has been recognised in respect of expected credit losses due from related parties. \u2013  There were no other related party transactions in the year ended 30 June 2023 (2022: US$ nil), other than those with post-employment benefit plans for the benefit of Group employees. These are shown in note 27 \u2018Employee benefits, restructuring and post-retirement employee benefits provisions\u2019. \u2013  Related party transactions with Samarco are described in note 4 \u2018Significant events \u2013 Samarco dam failure\u2019 . ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForTransactionsWithRelatedPartiesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-649": {
   "value": "34  Contingent liabilities 2023  US$M 2022  US$M Associates and joint ventures 1  1,094 1,541 Subsidiaries and joint operations1 1,184 925 Total 2,278 2,466 1  There are a number of matters, for which it is not possible at this time to provide a range of possible outcomes or a reliable estimate of potential future exposures, and for which no amounts have been included in the table above. A contingent liability is a possible obligation arising from past events and whose existence will be confirmed only by occurrence or non-occurrence of one or more uncertain future events not wholly within the control of the Group. A contingent liability may also be a present obligation arising from past events but is not recognised on the basis that an outflow of economic resources to settle the obligation is not viewed as probable, or the amount of the obligation cannot be reliably measured. When the Group has a present obligation, an outflow of economic resources is assessed as probable and the Group can reliably measure the obligation, a provision is recognised. The Group has entered into various counter-indemnities of bank and performance guarantees related to its own future performance, which are in the normal course of business. The likelihood of these guarantees being called upon is considered remote. The Group presently has tax matters, litigation and other claims, for which the timing of resolution and potential economic outflow are uncertain. Obligations assessed as having probable future economic outflows capable of reliable measurement are provided at reporting date and matters assessed as having possible future economic outflows capable of reliable measurement are included in the total amount of contingent liabilities above. Individually significant matters, including narrative on potential future exposures incapable of reliable measurement, are disclosed below, to the extent that disclosure does not prejudice the Group. Uncertain tax and royalty matters The Group is subject to a range of taxes and royalties across many jurisdictions, the application of which is uncertain in some regards. Changes in tax law, changes in interpretation of tax law, periodic challenges and disagreements with tax authorities, and legal proceedings result in uncertainty of the outcome of the application of taxes and royalties to the Group\u2019s business. To the extent uncertain tax and royalty matters give rise to a contingent liability, an estimate of the potential liability is included within the table above, where it is capable of reliable measurement. Samarco contingent liabilities The table above includes contingent liabilities related to the Group\u2019s equity accounted investment in Samarco to the extent they are capable of reliable measurement. Details of contingent liabilities related to Samarco are disclosed in note 4 \u2018Significant events \u2013 Samarco dam failure\u2019. Divestments and demergers Where the Group divests or demerges entities, it is generally agreed to provide certain indemnities to the acquiring or demerged entity. Such indemnities include those provided as part of the demerger of South32 Ltd in May 2015, divestment of Group\u2019s Onshore US assets in September 2018 and October 2018, divestment of BMC in May 2022 and the merger of the Group\u2019s Petroleum business with Woodside in June 2022. No material claims have been made pursuant to these indemnities as at 30 June 2023. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfContingentLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-754": {
   "value": "A contingent liability is a possible obligation arising from past events and whose existence will be confirmed only by occurrence or non-occurrence of one or more uncertain future events not wholly within the control of the Group. A contingent liability may also be a present obligation arising from past events but is not recognised on the basis that an outflow of economic resources to settle the obligation is not viewed as probable, or the amount of the obligation cannot be reliably measured. When the Group has a present obligation, an outflow of economic resources is assessed as probable and the Group can reliably measure the obligation, a provision is recognised. The Group has entered into various counter-indemnities of bank and performance guarantees related to its own future performance, which are in the normal course of business. The likelihood of these guarantees being called upon is considered remote. The Group presently has tax matters, litigation and other claims, for which the timing of resolution and potential economic outflow are uncertain. Obligations assessed as having probable future economic outflows capable of reliable measurement are provided at reporting date and matters assessed as having possible future economic outflows capable of reliable measurement are included in the total amount of contingent liabilities above. Individually significant matters, including narrative on potential future exposures incapable of reliable measurement, are disclosed below, to the extent that disclosure does not prejudice the Group. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForContingentLiabilitiesAndContingentAssetsExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-651": {
   "value": "35  Subsequent events On 14 August 2023, an application to commence a class action was filed in the High Court of South Africa on behalf of current and former mineworkers, and the dependants of certain mineworkers, who have contracted coal mine dust lung disease and who work or have worked on specified coal mines in South Africa between 1965 to date. \u2018BHP Billiton Plc Incorporated\u2019 was named as one of four respondents, alongside South32 SA Holdings Limited, South32 Coal SA (Pty) Limited, and Seriti Power (Proprietary) Limited.  The amount of damages sought by the Applicants on behalf of the putative class is unspecified.  Given the preliminary status of this matter, it is not possible at this time to provide a range of possible outcomes or a reliable estimate of potential future exposures for the Group.  However, the Group anticipates that claims for indemnification may be made under the terms of the Separation Deed agreed as part of the demerger of South32 Limited in 2015.  Other than the matters outlined above or elsewhere in the Financial Statements, no matters or circumstances have arisen since the end of the financial year that have significantly affected, or may significantly affect, the operations, results of operations or state of affairs of the Group in subsequent accounting periods. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEventsAfterReportingPeriodExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-650": {
   "value": "36  Auditor\u2019s remuneration 2023  US$M 2022  US$M 2021  US$M Fees payable to the Group\u2019s auditors for assurance services Audit of the Group\u2019s Annual Report 9.700 9.816 10.642 Audit of the accounts of subsidiaries, joint ventures and associates 0.551 0.605 1.234 Audit-related assurance services required by legislation to be provided by the auditor 1.808 1.933 1.770 Other assurance and agreed-upon procedures under legislation or contractual arrangements 1.991 7.938 1.867 Total assurance services 14.050 20.292 15.513 Fees payable to the Group\u2019s auditors for non-assurance services Other services 0.180  \u2212  \u2212 Total other services 0.180  \u2212  \u2212 Total fees 14.230 20.292 15.513 All amounts were paid to EY or EY affiliated firms with fees determined, and predominantly billed, in US dollars. Fees payable to the Group\u2019s auditors for assurance services Audit of the Group\u2019s Annual Report comprises fees for auditing the statutory financial report of the Group and includes audit work in relation to compliance with section 404 of the US Sarbanes-Oxley Act. Audit-related assurance services required by legislation to be provided by the auditors mainly comprises review of the half-year report. Other assurance services comprise assurance in respect of the Group\u2019s sustainability reporting, economic contribution reporting, and other non- statutory reporting. Fees payable to the Group\u2019s auditors for other services Other services provided in FY2023 relate to an independent assessment of technology project governance. No amounts were payable for other services in FY2022 or FY2021. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAuditorsRemunerationExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-652": {
   "value": "37  BHP Group Limited BHP Group Limited does not present unconsolidated parent company Financial Statements. Selected financial information of the BHP Group Limited parent company is as follows: 2023  US$M 2022  US$M Income statement information for the financial year Profit after taxation for the year 10,924 22,871 Total comprehensive income 10,925 22,868 Balance sheet information as at the end of the financial year Current assets 3,579 4,778 Total assets 39,232 43,565 Current liabilities 1,476 3,176 Total liabilities 1,637 3,517 Share capital 4,449 4,350 Treasury shares (41) (31) Reserves 165 168 Retained earnings 33,022 35,561 Total equity 37,595 40,048 Parent company guarantees BHP Group Limited has guaranteed certain financing arrangements available to subsidiaries of US$5,499 million at 30 June 2023 (2022: US$6,980 million). BHP Group Limited and its wholly owned subsidiary BHP Group (UK) Ltd (formerly BHP Group Plc) have severally, fully and unconditionally guaranteed the payment of the principal and premium, if any, and interest, including certain additional amounts that may be payable in respect of the notes issued by 100 per cent owned finance subsidiary, BHP Billiton Finance (USA) Ltd. BHP Group Limited and BHP Group (UK) Ltd have guaranteed the payment of such amounts when they become due and payable, whether on an interest payment date, at the stated maturity of the notes, by declaration or acceleration, call for redemption or otherwise. The guaranteed liabilities at 30 June 2023 amounted to US$4,234 million (2022: US$4,234 million). In addition, BHP Group Limited and BHP Group (UK) Ltd have severally guaranteed a Group Revolving Credit Facility of US$5,500 million (2022: US$5,500 million), which remains undrawn. In FY2023, BHP Group Limited has severally, fully and unconditionally guaranteed the payment of principal and premium, if any, and interest related to US$2,750 million of US Global bonds issued by BHP Billiton Finance (USA) Ltd. In addition, BHP Group Limited has severally, fully and unconditionally guaranteed a US$5,000 million acquisition facility drawn in FY2023 by its wholly owned subsidiary, BHP Lonsdale Investments Pty Ltd. ",
   "dimensions": {
    "concept": "bhp:DisclosureOfParentEntityInformation",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-653": {
   "value": "38  Deed of Cross Guarantee BHP Group Limited together with certain wholly owned subsidiaries set out below have entered into a Deed of Cross Guarantee (Deed) dated 6 June 2016 or have subsequently joined the Deed by way of an Assumption Deed. The effect of the Deed is that BHP Group Limited has guaranteed to pay any outstanding liabilities upon the winding up of any wholly owned subsidiary that is party to the Deed. Wholly owned subsidiaries that are party to the Deed have also given a similar guarantee in the event that BHP Group Limited or another party to the Deed is wound up. The wholly owned subsidiaries that are identified below are relieved from the requirements to prepare and lodge audited financial statements. The following companies are parties to the Deed and members of the Closed Group as at 30 June 2023: BHP (Towage Services) Pty Ltd 1 OS ACPM Pty Ltd 1 BHP Direct Reduced Iron Pty Limited  OS MCAP Pty Ltd1 BHP Iron Ore Pty Ltd1 UMAL Consolidated Pty Ltd 1 BHP Minerals Pty Ltd1 BHP Freight Pty Ltd BHP WAIO Pty Ltd1 BHP Group Operations Pty Ltd 1 Pilbara Gas Pty Limited  BHP Innovation Pty Ltd BHP Coal Pty Ltd1  BHP Lonsdale Investments Pty Ltd BHP MetCoal Holdings Pty Ltd1  BHP Minerals Holdings Proprietary Limited1 Broadmeadow Mine Services Pty Ltd  BHP Nickel West Pty Ltd1 Central Queensland Services Pty Ltd  BHP Olympic Dam Corporation Pty Ltd1 Hay Point Services Pty Limited  The Broken Hill Proprietary Company Pty Ltd1 BHP Yakabindie Nickel Pty Ltd1 1  These companies are parties to the Deed and are relieved from the Corporations Act 2001 requirements for preparation, audit and lodgement of financial reports and Directors\u2019 reports. A Consolidated Statement of Comprehensive Income and Retained Earnings and Consolidated Balance Sheet, comprising BHP Group Limited and the wholly owned subsidiaries that are party to the Deed for the years ended 30 June 2023 and 30 June 2022 are as follows: Consolidated Statement of Comprehensive Income and Retained Earnings 2023  US$M 2022  US$M Revenue 32,649 38,159 Other income 5,553 6,077 Expenses excluding net finance costs (21,703) (15,293) Net finance costs (1,002) (172) Total taxation expense (3,562) (5,651) Profit after taxation  11,935 23,120 Total other comprehensive income  \u2212 (3) Total comprehensive income 11,935 23,117 Retained earnings at the beginning of the financial year 40,196 50,277 Net effect on retained earnings of entities added to/removed from the Deed  \u2212 (62) Profit after taxation for the year 11,935 23,120 Transfers to and from reserves (44) (84) Dividends  (13,420) (33,055) Retained earnings at the end of the financial year 38,667 40,196 Consolidated Balance Sheet 2023  US$M 2022  US$M ASSETS Current assets Cash and cash equivalents 3 13 Trade and other receivables 1,678 1,527 Loans to related parties 6,123 8,697 Other financial assets 4 284 Inventories 2,344 2,582 Current tax assets 79 \u2013 Other  113 75 Total current assets 10,344 13,178 Non-current assets Trade and other receivables 34 43 Other financial assets 326 234 Inventories 546 456 Property, plant and equipment 37,069 36,199 Intangible assets 1,140 1,120 Investments in Group companies  33,176 26,800 Other 6  \u2013 Total non-current assets 72,297 64,852 Total assets 82,641 78,030 LIABILITIES Current liabilities Trade and other payables 3,574 3,919 Loans from related parties 19,564 9,966 Interest bearing liabilities 5,168 213 Other financial liabilities  \u2212 26 Current tax payable  \u2212 1,783 Provisions  1,961 1,611 Deferred income 4 8 Total current liabilities 30,271 17,526 Non-current liabilities Trade and other payables 5 \u2013 Loans from related parties 2,800 10,014 Interest bearing liabilities 657 586 Other financial liabilities 38 \u2013 Deferred tax liabilities 773 874 Provisions 4,408 3,896 Deferred income 3 5 Total non-current liabilities 8,684 15,375 Total liabilities 38,955 32,901 Net assets 43,686 45,129 EQUITY Share capital \u2013 BHP Group Limited 4,737 4,638 Treasury shares (41) (31) Reserves 323 326 Retained earnings 38,667 40,196 Total equity  43,686 45,129 ",
   "dimensions": {
    "concept": "bhp:DisclosureOfDeedOfCrossGuarantee",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-755": {
   "value": "39  New and amended accounting standards and interpretations and changes to accounting policies New and amended accounting pronouncements adopted in the current year Amendment to IAS 16/AASB 116 \u2018Property, Plant and Equipment\u2019 (IAS 16) On 1 July 2022, the Group adopted an amendment to IAS 16 that requires an entity to recognise the sales proceeds from selling items produced while preparing property, plant and equipment for its intended use, along with the costs associated with producing that revenue, in profit or loss, instead of deducting the amounts received from the cost of the asset. The amendment applies retrospectively to items of property, plant and equipment made available for use on or after 1 July 2020. However, no significant impacts have been identified in respect of the years ended 30 June 2022 and 30 June 2021 and, as such, comparative period financial information has not been restated. Amendment to IAS 12/AASB112 \u2018Income taxes\u2019 (IAS 12) At 30 June 2023, the Group has adopted amendments to IAS12 issued by the IASB and AASB on 23 May 2023 and 27 June 2023, respectively, in relation to the Organisation for Economic Co-operation and Development (OECD)/G20 Inclusive Framework on Base Erosion and Profit Shifting (BEPS) Pillar Two income tax. The amendments introduced a temporary exception to the requirements of IAS 12 under which a company does not recognise or disclose information about deferred tax assets and liabilities related to the proposed Pillar Two model rules. Refer to note 6 \u2018Income tax expense\u2019 for more information. New and amended accounting pronouncements on issue but not yet effective A number of other accounting standards and interpretations have been issued and will be applicable in future periods. While these remain subject to ongoing assessment, no significant impacts have been identified to date. These pronouncements have not been applied in the preparation of these Financial Statements.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfChangesInAccountingPoliciesExplanatory",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-770": {
   "value": "New and amended accounting pronouncements adopted in the current year Amendment to IAS 16/AASB 116 \u2018Property, Plant and Equipment\u2019 (IAS 16) On 1 July 2022, the Group adopted an amendment to IAS 16 that requires an entity to recognise the sales proceeds from selling items produced while preparing property, plant and equipment for its intended use, along with the costs associated with producing that revenue, in profit or loss, instead of deducting the amounts received from the cost of the asset. The amendment applies retrospectively to items of property, plant and equipment made available for use on or after 1 July 2020. However, no significant impacts have been identified in respect of the years ended 30 June 2022 and 30 June 2021 and, as such, comparative period financial information has not been restated. Amendment to IAS 12/AASB112 \u2018Income taxes\u2019 (IAS 12) At 30 June 2023, the Group has adopted amendments to IAS12 issued by the IASB and AASB on 23 May 2023 and 27 June 2023, respectively, in relation to the Organisation for Economic Co-operation and Development (OECD)/G20 Inclusive Framework on Base Erosion and Profit Shifting (BEPS) Pillar Two income tax. The amendments introduced a temporary exception to the requirements of IAS 12 under which a company does not recognise or disclose information about deferred tax assets and liabilities related to the proposed Pillar Two model rules. Refer to note 6 \u2018Income tax expense\u2019 for more information. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfInitialApplicationOfStandardsOrInterpretations",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-771": {
   "value": "New and amended accounting pronouncements on issue but not yet effective A number of other accounting standards and interpretations have been issued and will be applicable in future periods. While these remain subject to ongoing assessment, no significant impacts have been identified to date. These pronouncements have not been applied in the preparation of these Financial Statements.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfExpectedImpactOfInitialApplicationOfNewStandardsOrInterpretations",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  },
  "fact-6": {
   "value": "Level 18 171 Collins Street Melbourne VIC 3000",
   "dimensions": {
    "concept": "ifrs-full:AddressOfRegisteredOfficeOfEntity",
    "language": "en",
    "entity": "scheme:WZE1WSENV6JSZFK0JC28",
    "period": "2022-07-01T00:00:00/2023-07-01T00:00:00"
   }
  }
 }
}