false549300ZM2QCFG22BOJ032024-04-012025-03-31iso4217:GBP549300ZM2QCFG22BOJ032023-04-012024-03-31549300ZM2QCFG22BOJ032025-03-31549300ZM2QCFG22BOJ032024-03-31549300ZM2QCFG22BOJ032023-03-31ifrs-full:IssuedCapitalMember549300ZM2QCFG22BOJ032023-03-31ifrs-full:SharePremiumMember549300ZM2QCFG22BOJ032023-03-31ifrs-full:RevaluationSurplusMember549300ZM2QCFG22BOJ032023-03-31ifrs-full:CapitalRedemptionReserveMember549300ZM2QCFG22BOJ032023-03-31ifrs-full:RetainedEarningsMember549300ZM2QCFG22BOJ032023-03-31549300ZM2QCFG22BOJ032023-04-012024-03-31ifrs-full:IssuedCapitalMember549300ZM2QCFG22BOJ032023-04-012024-03-31ifrs-full:SharePremiumMember549300ZM2QCFG22BOJ032023-04-012024-03-31ifrs-full:RevaluationSurplusMember549300ZM2QCFG22BOJ032023-04-012024-03-31ifrs-full:CapitalRedemptionReserveMember549300ZM2QCFG22BOJ032023-04-012024-03-31ifrs-full:RetainedEarningsMember549300ZM2QCFG22BOJ032024-03-31ifrs-full:IssuedCapitalMember549300ZM2QCFG22BOJ032024-03-31ifrs-full:SharePremiumMember549300ZM2QCFG22BOJ032024-03-31ifrs-full:RevaluationSurplusMember549300ZM2QCFG22BOJ032024-03-31ifrs-full:CapitalRedemptionReserveMember549300ZM2QCFG22BOJ032024-03-31ifrs-full:RetainedEarningsMember549300ZM2QCFG22BOJ032024-04-012025-03-31ifrs-full:IssuedCapitalMember549300ZM2QCFG22BOJ032024-04-012025-03-31ifrs-full:SharePremiumMember549300ZM2QCFG22BOJ032024-04-012025-03-31ifrs-full:RevaluationSurplusMember549300ZM2QCFG22BOJ032024-04-012025-03-31ifrs-full:CapitalRedemptionReserveMember549300ZM2QCFG22BOJ032024-04-012025-03-31ifrs-full:RetainedEarningsMember549300ZM2QCFG22BOJ032025-03-31ifrs-full:IssuedCapitalMember549300ZM2QCFG22BOJ032025-03-31ifrs-full:SharePremiumMember549300ZM2QCFG22BOJ032025-03-31ifrs-full:RevaluationSurplusMember549300ZM2QCFG22BOJ032025-03-31ifrs-full:CapitalRedemptionReserveMember549300ZM2QCFG22BOJ032025-03-31ifrs-full:RetainedEarningsMember023669492024-04-012025-03-3102366949bus:Consolidated2024-04-012025-03-3102366949bus:Consolidated2025-03-31023669492025-03-31xbrli:pure02366949bus:Director12024-04-012025-03-3102366949bus:Audited2024-04-012025-03-3102366949bus:FullIFRS2024-04-012025-03-3102366949bus:FullAccounts2024-04-012025-03-3102366949bus:Director1bus:Consolidated2024-04-012025-03-31
Company Registration No. 02366949
ELECTRICITY NORTH WEST LIMITED
Annual Report and Consolidated Financial Statements
for the year ended 31 March 2025
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
Introduction
Electricity North West Limited (“ENWL” or ‘’the Company’’) is the electricity distributor for the North
West of England. We are responsible for maintaining and upgrading the network of poles, wires,
transformers and cables which carry electricity from both the national grid and locally connected
generation to homes and businesses across the North West. Our job is to keep electricity flowing safely
and reliably to our customers’ homes and businesses, keeping the power on 24 hours a day, seven
days a week. We are proud of who we are, the essential role we play for our customers, the critical
role we play to support the move to net zero carbon, and the investment we make in the communities
we serve. We recognise the role that electricity, and the electricity distribution network operators
such as ourselves, play in leading and facilitating the net zero transition, managing power flows from
a range of sources as we move away from fossil fuels towards electricity for heating and transport.
We do all this while keeping costs as low as we can for our customers.
We are pleased to present the Annual Report and Consolidated Financial Statements of the Company
and its subsidiaries (together referred to as “the Group”) to shareholders for the year ended 31 March
2025. Further information on the Company can be found by visiting our website: www.enwl.co.uk.
The Company is limited by shares and incorporated and domiciled in England, the United Kingdom
under the Companies Act 2006.
Notice regarding limitations on directors’ liability under English Law
The information supplied in the Strategic Report and Directors’ Report has been drawn up and presented in accordance with English Law.
The liabilities of the directors in connection with these reports shall be subject to the limitations and restrictions provided by such law.
Strategic Report
In preparing the Strategic Report, the directors have complied with s414 of the Companies Act 2006. The Strategic Report has been prepared
for the Electricity North West Group as a whole comprising Electricity North West Limited (‘’the Company’’) and its non-trading subsidiaries
(together, ‘‘the Group’’).
Cautionary statement regarding forward-looking statements
The Chair’s Statement, Chief Executive Officer’s Statement and Strategic Report sections of the Annual Report and Consolidated Financial
Statements (‘‘the Annual Report’’) have been prepared solely to provide additional information to the shareholders to assess the Group
strategies and the potential for those to succeed. These sections and other sections of the Annual Report contain certain forward looking
statements that are subject to factors associated with, amongst other matters, the economic and business circumstances occurring within
the region and country in which the Group operates. It is believed that the expectations reflected in these statements are reasonable but
they may be affected by a wide range of variables which could cause actual results to differ materially from those anticipated at the date of
the Annual Report. The Group does not undertake any obligation to update or revise these forward-looking statements, except as may be
required by law or regulation.
Regulatory reporting and regulatory audits for the year ended 31 March 2025
Certain regulatory performance data contained in this Annual Report remain subject to regulatory audit by the Office of Gas and Electricity
Markets (‘’Ofgem’’). The final regulatory reporting pack for the year ended 31 March 2025 is not due for submission to Ofgem until July
2025, and will be reviewed by Ofgem after their submission.
Website and investor relations
The Company’s website, www.enwl.co.uk, gives additional information on the Company and Group. Notwithstanding the references we
make in this Annual Report to the website, none of the information made available on the website constitutes part of this Annual Report or
shall be deemed to be incorporated by reference herein. Interested institutional debt investors can also gain access to additional financial
information by visiting our website www.enwl.co.uk/about-us/investor-relations.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
Contents
Chair’s Statement .................................................................................................................................... 4
Chief Executive Officer’s Statement ........................................................................................................ 6
Strategic Report..................................................................................................................................... 10
- Company Background ..................................................................................................................... 10
- Corporate Social Responsibility ...................................................................................................... 21
- Non-Financial and Sustainability Information Statement ............................................................... 23
- Key Performance Indicators ............................................................................................................ 32
- Financial Performance .................................................................................................................... 36
- Risk Management ........................................................................................................................... 43
Corporate Governance Report .............................................................................................................. 51
- The Board ....................................................................................................................................... 51
- Board Committees .......................................................................................................................... 59
- Report of the Audit and Risk Committee ........................................................................................ 59
- Report of the Audit and Compliance Committee............................................................................ 62
- Report of the Nominations Committee .......................................................................................... 63
- Report of the Remuneration Committee ........................................................................................ 63
- Report of the Safety, Health and Environment Committee ............................................................ 66
Directors’ Report ................................................................................................................................... 67
Directors’ Responsibilities Statement .................................................................................................... 70
Independent Auditor’s Report to the Members of Electricity North West Limited............................... 72
Financial Statements ............................................................................................................................. 84
- Consolidated and Company Statements of Profit or Loss and Other Comprehensive Income ....... 84
- Consolidated and Company Statements of Financial Position ........................................................ 85
- Consolidated Statement of Changes in Equity ................................................................................ 87
- Company Statement of Changes in Equity ...................................................................................... 88
- Consolidated and Company Statements of Cash Flows .................................................................. 89
Notes to the Financial Statements ........................................................................................................ 90
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
4
Chair’s Statement
I am pleased to introduce the Annual Report
and Consolidated Financial Statements for
Electricity North West Limited (“ENWL”) for
the year ended 31 March 2025.
2024/25 has been a year of distinction for
ENWL – named “Utility of the Year” at the 2024
Utility Week Awards organised by Utility Week,
the leading publication in our industry. This
outstanding feat was achieved against a
backdrop of managing heavy storm activity on
the operations front, massive investment and
change in the cyber and IT functions, and
handling a highly complex and time intensive
corporate sale of the business. Whatever these
challenges, our customers’ needs and their
views always came first, and the Board is
pleased to report that both the customer
feedback and our customer performance in
tracker tables are extremely positive. Indeed,
ENWL achieved the largest ever improvement
in stakeholder engagement for vulnerable
customers ever recorded by the industry
regulator, the Office of Gas and Electricity
Markets (“Ofgem”). It is fair to report that
ENWL is clearly one of the best performing
DNO (distribution network operators) of the
fourteen DNOs as reviewed and rated by
Ofgem, and this is a great legacy to build upon
as ENWL moves to the next phase of its
corporate history.
Throughout all the challenges of the last year
the Board has been keen to ensure that the
safety record remains high, staff fatigue is
watched during such intense storm activity,
and that the staff are treated well in the pay
awards. The latter was achieved through an
industry leading three year package starting in
August 2024, and we are grateful to the trade
unions and their representatives for such a
positive process.
The operational, financial and cultural
achievements of the Executive and Senior
Management Team at ENWL would, in a
normal year, be commended.
However, these two groups – especially the
Executive Committee – have had to steer the
company through the hugely complex and time
consuming process of the sale of majority of
ENWL’s ultimate group shareholding to
Iberdrola, S.A. (“Iberdrola”), the Spanish
multinational electric utility company. I have
worked with both the Chief Executive officer
(CEO) and the Chief Financial Officer (CFO) on
the formally constituted liaison panel (which
met during the Competition and Markets
Authority (CMA) process, with the agreement
of the CMA) with the senior managers of
Iberdrola, and I have been impressed by the
management of the process.
The change of ultimate ownership for ENWL
will inevitably bring changes, but I am
delighted to report that our Japanese owners,
KDM Power Limited (“KDM”), will be
continuing as minority shareholders – and we
continue to draw upon their significant
expertise and guidance. In particular, Yamada
Masahide from Kansai Electric, has been
central to managing the successful sale process
and also working with the CEO to agree a new
collaboration agreement. We will continue to
share experiences and advice and indeed
personnel, and ENWL will expect to join the
Mayor’s delegation to Osaka again in summer
2025, after their very successful visit in late
2023.
The workload for my colleagues on the Board
has also been much higher than normal given
the corporate changes – but also due to the
additional focus that regulators and the
Government expect from Independent Non-
Executive Directors (“INEDs”). I would like to
thank Rob Holden, who contributed three
terms as an INED and led the Board’s audit and
accounts involvement. It would also be remiss
for me not to thank the other two INEDs: Anne
Baldock’s years at the top of the legal
profession helping us hugely in the recent
corporate transaction; and Susan Cocklin’s
background in IT helping us so much as we
come to terms with the increasing demands of
AI, cyber fraud and general IT challenges.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
5
Chair’s Statement (continued)
All three INEDs left the Group and Company
following CMA’s clearance of the sale
transaction near the end of March 2025, with
our thanks for jobs well done.
Looking ahead there are probably two
essential challenges for the ENWL Board in
2025. Firstly, achieving the successful
integration of the business into the Iberdrola
Group - whilst not dropping our standards or
performance levels. The second is to ensure
that, as part of our licence obligations, we seek
and then deliver upon the financially very
significant Load-Related Expenditure and
Cyber Resilience re-opener programmes from
Ofgem.
I hold a privileged position of seeing most
aspects of the business and my final comment
this year is to highlight the tremendous
workload and the highest professional
standards that the CEO (Ian Smyth) and the
CFO (Chris Johns), who both sit on the Board,
have brought to ENWL. They managed to keep
the momentum on the operational side whilst
managing the corporate transaction, and all
the associated issues that require the most
careful and sensitive management.
Alistair Buchanan CBE
Chair
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
6
Chief Executive Officer’s Statement
I am pleased to present the Annual Report and
Consolidated Financial Statements (“the
Annual Report"), for the year ended 31 March
2025.
We have now completed the second full year
of the delivery of RIIO-ED2, our current 5-year
price control period (April 2023 to March
2028), and I am pleased to report the business
continues to perform strongly against the 5
year business plan. This has been a year of
significant change for the business. Our
strategy “From Good to Great” has continued
to deliver continuous improvement in all areas
of the business. In addition, we have
embedded and built on the capital delivery
model, which was implemented last year, and
this has transformed the execution of our
capital programme. We have seen a step
change in the scale of the investment we are
making against our allowances. We have also
continued to make significant changes through
the delivery of our Cyber Security programme
to better protect the network and the
business. Last year we achieved basic
compliance with the National Information
Security cyber assessment framework and this
year we are on track to achieving compliance
with the enhanced framework requirements
which we expect to achieve in December,
assuring the resilience of the business against
multi-vector threats and attacks.
These changes have been achieved in the
context of both a complex and successful sale
of the business and a number of significant
extreme weather events which have not been
experienced before. The business successfully
changed hands as the private equity
shareholders exchanged ownership with
strategic utility owner/operators, Iberdrola.
Kansai, the Japanese utility, retained their
ownership albeit at a reduced level. The
business then successfully navigated a CMA
investigation jointly with our new shareholders
who took control of the business on 20 March
as the CMA investigation completed.
Storm Éowyn, in January 2025, was the largest
storm we have experienced, outstripping
Storm Arwen of 2021, and was a harsh test of
the developments we have made as a business.
Our improved storm resilience and response
was evident through transformed restoration
times for customers compared to Storm
Arwen, despite a substantial increase in the
number of customers adversely impacted and
off supply.
Our success this year was endorsed externally
by our industry when we won “Utility of the
Year” and “Innovator of the Year” awards in
December 2024. These achievements
energised the whole organisation as we faced
the storms with renewed vigour. Importantly,
on 7 April 2025 Ofgem, our regulator,
published their assessment of the
performance of all of the distribution network
operators (DNOs) for the first year of RIIO-ED2.
I am very pleased to report, that ENWL is the
only DNO to receive a perfect score across all
eight assessment criteria used by Ofgem to
assess performance. This is the first time in
eight years that any DNO has achieved this
standard. Ofgem’s assessment of cost
performance also places ENWL at the frontier
of efficiency. At the end of the second year of
RIIO-ED2, ENWL is the best performing DNO
averaged across the Ofgem performance
measures and is setting the frontier for
performance as we move into the baseline
year for ED3 business planning.
Our strategy “From Good to Great” is
delivering. Employee safety and engagement is
the highest it has ever been. We are the most
reliable and most innovative network. Our
customer service is the highest it has ever
been, and we are one of the top performers in
cost efficiency. However, there remains much
to do as we look ahead to the coming year. The
first priority is to ensure the successful
integration of ENWL within the Iberdrola group
which includes a change to accounting year
from fiscal to calendar year and aligning the
business to new corporate governance and
reporting standards, policies and procedures.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
7
Chief Executive Officer’s Statement
(continued)
Our second priority is to ensure the continued
success of the business through maintaining
our journey from good to great. This year we
will launch “Social DSO”, our unique approach
to distribution system operation which aims to
ensure no one is left behind in the energy
transition. We will also mobilise our ED3
programme as we start to look ahead to the
next price control period and securing the scale
of investment required to ensure the
ambitions of the government in Clean Power
2030, the communities of the North West and
the employees of ENWL are achieved at pace.
With new shareholders and part of a larger
group, we look ahead with excitement ready to
take the initiative the Energy Transition
provides.
Delivering our “licence to operate”
Our legitimacy as an enterprise is derived not
just from Ofgem, our regulator, but directly
from the employees, customers and
communities we serve. This starts with safety
and this year we have seen the benefit of
further developments we have made in this
area; the business delivered 14 months
without a Lost Time Injury (“LTI”) which is an
increase on the best performance we saw in
the previous year. Unfortunately, we had one
LTI in January 2025, but we have not
experienced any further LTIs since then. We
are focused on continually innovating to
improve our safety performance so we can
remain at the frontier of safety performance in
our sector.
Our core focus as a business is always the
customers and communities that we serve to
ensure that we understand and continue to
respond to their needs and to enable us to
legitimately deliver our licence to operate.
It has continued to be a difficult time for our
communities with energy costs remaining at
the high level that we have seen over the last
few years, which serves to only increase the
importance of the service we provide to the
most vulnerable and poorest members of our
community. We have continued to increase
support to customers in vulnerable
circumstances, further developing our Take
Charge campaign with our strategic partners to
support initiatives on fuel poverty and energy
efficiency. Our aim to be one of the lowest cost
providers has ensured we maintain the
support of the largest commercial and public
sector organisations in our area.
Our focus on our customers has led to further
improvements in our customer satisfaction,
resulting in our highest ever score of 92.9%
which is a 0.9% improvement on last year’s
score. The focus on our vulnerable customers
is also endorsed through our performance on
the new vulnerability incentives (as part of the
Customer Satisfaction Fuel Poverty incentive),
and our customers have rated our service
94.5%.
Delivering a reliable network for our
customers
Our primary obligation is to deliver a safe,
reliable supply of electricity. Extreme weather
this year presented new challenges which
meant we did not meet our Customer
Interruptions (“CIs”) and Customer Minutes
Lost (“CMLs”) internal targets. However, the
improvements we have made in the last few
years in our storm resilience and response
have allowed us to perform much better
during Storm Éowyn. This was the largest
storm we have experienced since Storm
Arwen, and we restored power to 110,000
properties quicker than in Arwen despite there
being 15,000 more properties off supply. As
part of our customer response efforts, we
knocked on over 1,500 doors and proactively
contacted 25,000 vulnerable customers to
offer our support.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
8
Chief Executive Officer’s Statement
(continued)
Re-openers are a significant feature of the
RIIO-ED2 regulatory framework, and we have
continued to be very successful in our re-
opener applications. The Storm Arwen re-
opener provides additional investment which
will allow us to continue to enhance the storm
resilience of the network. We are also investing
in resilience in relation to technological threats
which have been funded through the Cyber re-
openers.
Delivering stewardship and investment to
enable net zero
Our approach to asset management,
innovation and capital investment and delivery
is pragmatic and targeted. Our activities are
targeted to improve the performance of the
network, develop and reinforce the network
efficiently and deliver shareholder value.
Our biggest challenge last year was capital
delivery as, like all other DNOs, mobilisation
was slower than we planned. The changes
made last year have been embedded in this
second year of the price control, to enable a
much-improved capital delivery and
commercial services function, which has been
able to deliver a much larger capital
programme. Capital delivery will need to
continue to increase throughout RIIO-ED2 and
into ED3. We will continue to work on
improvements to our processes and enhance
our collaboration with strategic partners so we
can secure the resources and materials needed
to deliver these large programmes of work.
A key output of some or our forward planning
has been our recently submitted Load-Related
Expenditure re-opener application which will
allow us to make a significant investment of
over £200m in the network to deliver
additional capacity which is now needed due to
new connections and the growth we are seeing
in demand and generation.
The North West is one of the fastest growing
regions in the UK and as part of this application
we conducted extensive stakeholder
engagement to ensure we understand our
stakeholders’ plans so that our network can
support this growth and enable
decarbonisation to help deliver the UK’s net
zero target. Securing this investment will allow
us to mobilise supply chains and start ramping
up our delivery to meet the expected increases
in demand over this and future price controls.
Innovation is essential to maintain our sector
leading network performance and reliability
levels, and to meet the increasing demands on
electricity from the decarbonisation of energy,
at an affordable cost. We continue to develop
and deliver our cutting-edge engineering
innovations such as CLASS, Smart Street and
LineSIGHT that will keep the network reliable,
efficient and safe.
Delivering a resilient and diverse workforce
Our employee engagement is quantifiably
assessed annually in the Climate Survey, which
is undertaken by an independent, respected,
expert organisation. The agreement score of
83.9% is our highest ever and achieved despite
the background of significant change in the
business this year. Gender pay gap overall
increased slightly from 11.6% to 11.9%.
Importantly, we do not have a gender pay gap
for employees aged under 25, and we have a
much smaller pay gap (approx. 6%) for those
between the ages of 25 to 35, which bodes well
for the future shape of our workforce. The
recent revisions to parental pay places us at
the frontier for benefits for maternity and
primary care givers in our sector and ensures
we are well placed to retain the diversity
reflective of the communities we serve. In
August 2024, working closely with our union
partners, we secured a three year pay deal,
recognising the importance of stability and
security for our valued workforce.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
9
Chief Executive Officer’s Statement
(continued)
Financial performance in the year
The financial performance for the Company
continues to be strong, supported by the cost
efficiencies and incentive revenue earnings
that we have delivered in the year. Overall, our
revenue has grown by £77.7m to £654.4m, net
of the collection of Supplier of Last Resort
levies from which we make no profit, with the
full amount paid to suppliers immediately on
collection of the levy. Supported by the
increase in revenues, we have increased the
levels of capital investment, improving
network resilience and capacity. Total capital
expenditure during the year was £374m, £83m
higher than the prior year.
Our income statement continues to show the
impacts of the macro-economic environment
on non-cash items in our accounts. In
particular, we have seen significant accounting
fair value gains on our derivative instruments
(£41.6m fair value gain in the year, compared
to £102.3m fair value gain in the prior year)
which results in a non-cash increase (2024:
increase) in profit before tax. A portion of this
non-cash fair value movement was offset by
the cash payment of accretion in prior year of
£87.0m with no accretion payments in the
current year, with the remainder reflecting
volatility in the markets and, in particular, in
interest and inflation forecasts.
The sale process, which started last financial
year, came to its conclusion in October 2024
with the sale of 88% of the business to
Iberdrola, S.A.; the transaction was then
referred for CMA review and an Initial
Enforcement Order was issued by the CMA
preventing the integration of the two
businesses during the review process. On 20
March 2025, the CMA completed its review
and published its decision to approve the
transaction. That brought the CMA and
regulatory review process to a conclusion. The
Initial Enforcement Order was also lifted. We
now embark on a new journey as part of the
Iberdrola family with confidence that we will
deliver exceptional value for our new
shareholders and the group.
In conclusion
The business is in a very strong place going into
the third year of the price control. We have
performed at a high standard this year and our
frontier performance in our sector has been
externally recognised at the Utility Week
awards. We are now putting more of our focus
into looking forward to RIIO-ED3 and starting
to develop our plans and strategy for the next
price control so we can build on our current
performance levels and continually improve
the service we provide to all our stakeholders.
Ian Smyth
Chief Executive Officer
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
10
Strategic Report
Electricity North West Limited (“ENWL”) is a
private company limited by shares and
incorporated and domiciled in England, the
United Kingdom, under the Companies Act
2006. Ultimate ownership of ENWL changed in
the year and it is now 88% owned by Iberdrola,
S.A., one of the largest utility companies in the
world and a leader in renewable energy (see
Note 31 for more detail). The immediate
parent company remains North West
Electricity Networks plc (“NWEN plc”), an
intermediary holding and financing company
within the North West Electricity Networks
(Jersey) Limited (“NWEN (Jersey)”) group, part
of the wider group headed by lberdrola, S.A.
Company Background
ENWL is the electricity distribution network
operator (“DNO”) for the North West of
England, one of 14 DNO’s in the UK regulated
by the Gas and Electricity Markets Authority,
which operates through the Office of Gas and
Electricity Markets (“Ofgem”).
The Company serves approximately 5 million
customers at 2.4 million domestic and
industrial locations, has around 2,200
employees and provides a safe and reliable
electricity supply, 24 hours a day, seven days a
week.
ENWL owns, invests in, operates and maintains
the network of poles, wires, transformers and
cables which carry electricity from both the
national grid and locally connected generation
to homes and businesses across the North
West, together with the telecommunications
network that controls the network remotely.
The role we play in serving our communities
continues to evolve as we seek to transition to
a low carbon economy and electricity
generation becomes more distributed across
our network. We have moved from a fairly
linear network operating model:
To one that is far more complex and multi
directional at the distribution level, managing
power flows from a range of sources in a wider
system:
How we charge customers
We charge customers through their electricity
suppliers, in the case of domestic and small
customers, or directly in the case of larger
customers.
The prices that we charge are regulated by
Ofgem, but we recognise that ultimately it is
our customers that fund the business and its
investments in the network.
ENWL’s costs account for around 12% of the
typical domestic electricity bill charged by
suppliers to North West customers, equivalent
to £124 per home for the year ended 31 March
2025; this compares to an average DNO
customer bill impact of £142 per home for the
same financial year.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
11
Strategic Report (continued)
Regulatory framework
The prices the Company can charge customers
are regulated by Ofgem through its RIIO model;
Revenue = Incentives + Innovation + Outputs.
This model determines how much the
Company can charge customers to fund
network investment and operating costs in a
regulatory price control period, linking that to
the performance of the Company.
The price control in operation for the year
ended 31 March 2025 was RIIO-ED2, running
for a 5-year period from 1 April 2023 to 31
March 2028.
The base income in each year is largely fixed,
to cover the operating costs of the Company
and provide a return to investors. Allowed
revenue is then adjusted up or down
depending on performance against regulatory
outputs and incentive mechanisms.
These mechanisms incentivise excellent
customer service, stakeholder engagement,
delivery for connections customers and
network reliability, the latter based upon
minimising the number of interruptions that
customers suffer (CIs) and the average length
of those interruptions (CMLs). Performance
against the incentives is assessed annually and
any positive or negative adjustments are fed
into a process which modifies revenues for
subsequent years.
The RIIO model encourages cost reductions,
through innovation and efficiency, promoting
the delivery of a well-maintained and
efficiently invested network for the long-term.
Cost savings are shared between customers,
via price reductions, and shareholders.
In addition to the RIIO framework, the
Company charges separately for new
connections to, and diversions of, the network.
This activity is also regulated by Ofgem.
Investment and innovation are aimed at
ensuring the development and availability of
appropriate technology to meet the changing
demands of electricity supply and the
challenge of achieving a low carbon future, at
a price customers can afford.
External Factors
RIIO-ED2 and net zero transition
The RIIO-ED2 regulatory period is marked by a
significant increase in expenditure compared
to the previous regulatory period, with the
potential for further increases through
regulatory ‘uncertainty mechanisms’.
Delivering this increased investment in the
network and supporting the transition to net
zero are key challenges for the Company.
The net zero transition will result in increased
network demands by 2050, driven by both
renewable generation connections and electric
vehicles and heat pumps demands. A key
challenge in RIIO-ED2 is to provide the capacity
for customers to adopt these technologies, at
a price that is affordable.
The RIIO-ED2 business plan (provided on
Company’s website www.enwl.co.uk) sets out
a clear vision around net zero and how we will
ensure that the network is not a barrier to
connecting electric vehicles or other low
carbon technologies. It also sets out plans to
improve network reliability and resilience and
to look after customers in vulnerable
circumstances, at the lowest cost achievable.
Energy prices and supplier administrations
The unprecedented rise in energy prices since
2021 has put energy markets under severe
strain, with significant numbers of energy
suppliers entering administration. Although
the position has stabilised, we are still
collecting Supplier of Last Resort (“SoLR”)
charges through our revenue, as directed by
Ofgem. For the year ended 31 March 2025,
revenue includes SoLR levies of £0.8m (2024:
£22.0m). For more information see Note 4.
Political and economic backdrop
The ongoing political and economic volatility,
particularly the events in Ukraine, continues to
be monitored. Although there has been
limited direct impact, supply chain
management remains an area of focus and the
planned increase in stock levels to mitigate
supply chain risk has been maintained.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
12
Strategic Report (continued)
External Factors (continued)
Having considered the factors noted above,
there are no material impacts on either the
going concern statement (pages 40 to 41), or
the period covered by the viability statement
(page 41).
Purpose, Vision and Principles
We have a Purpose statement, Vision
statement, set of Principles and focus areas
embedded within the business ethos to steer
business performance.
Our Purpose statement ‘Together we have the
energy to transform our communities’ reflects
the essential role we play in the North West
and in the lives of our customers,
acknowledging how our role is changing
alongside the needs of our customers.
Transforming our communities is at the heart
of our Purpose, ensuring we take a responsible
approach in everything we do, including how
we treat and support:
• our customers;
• our environment;
• our communities; and
• our people.
Our Vision is to ‘Lead the North West to Net
Zero’. We do not say that lightly. The climate
challenge is the greatest of our age and
networks are uniquely positioned to enable
the transition from fossil fuels to low carbon
electricity to power our homes, businesses,
transport and heating.
As the DNO for the North West of England, we
are key to leading the region to net zero. We
are focusing on three things to make it happen,
at the lowest cost to customers:
1. Investing and innovating to make sure the
network is fit for the future;
2. Helping domestic customers and
businesses play their part, making new
connections as quick and easy as possible
while ensuring no one is left behind; and
3. Continuing to improve the reliability of the
network, which is fundamental as we all
become even more reliant on electricity.
Our Purpose and Vision are supported by our
Principles, setting the cultural framework
within which we operate.
The Principles, ‘We are switched on; We are
adaptable; We take pride’, capture the
cultural framework required for the Group to
deliver the Purpose and Vision.
The Group has four key focus areas: ‘Health,
Safety & Environment; Network Reliability;
Customer; and People’.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
13
Strategic Report (continued)
Health, Safety and Environment
The Company operates in a high hazard
industry and the safety of its people and
customers, and the protection of the
environment, will always remain key priorities.
During the year, we have strengthened the
team leadership with key appointments
enhancing our capabilities in this area.
Operational safety
The Company ensures that all people are well
trained and able to operate safely, backed by
policy driven procedures and compliance
assurance, alongside a behavioural approach
that seeks to ensure that all staff and
contractors approach any task with a strong
behavioural attitude to safety.
In the year ended 31 March 2025, we have
continued to review and improve our safety
management system which is certified to the
international standard ISO 45001.
We finished the year ended 31 March 2025
with a lost time injury frequency rate of 0.011
(2024: 0.023) having had one LTI (2024: two).
This low incident rate reflects the sustained
improvement since we embarked on a
company-wide initiative to create an enhanced
safety culture. The total reportable incident
rate was 0.146 (2024: 0.034), an increase on
the previous year driven by 13 RIDDOR
reportable HAVS cases from historical
exposure to hand-arm vibration. Other than
those there was just one other RIDDOR
reportable injury.
We are never complacent about safety. In the
year to 31 March 2026, we will embed an
updated plan to further improve our safety
record, including working closely with our
contract partners and the new owners.
As our safety journey continues, we are
increasingly focused on the quality of, and
learning from, safety observations and positive
challenges, rather than focusing on the volume
of these. Safety observations in the year were
recorded at 14,524 (2024: 11,647), with 2,785
positive challenges (2024: 2,778).
Asset safety
The safety of the Company’s employees,
delivery partners and the public from the
inherent risks of electrical assets is assured
through the Company’s ongoing asset
investment programme and the associated
asset risk management policies which define
the programme scope.
During the year ended 31 March 2025, the
Company continued to invest to reduce further
risks associated with link box failures and with
rising and lateral mains in multi occupancy
properties, such as blocks of flats.
Our link box inspection programme assesses
the risk of the asset which then, where
necessary, informs an intervention such as
blast mitigation protection, replacement or the
removal of the asset.
We continue to use innovation to target the
potential risks associated with electricity
supplies in multi occupancy properties. We
have installed innovative monitoring
equipment which helps identify abnormalities
and inform replacement decisions.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
14
Strategic Report (continued)
Health, Safety and Environment (continued)
Environmental performance
The Company is dedicated to achieving the
highest standards of environmental
performance, not only by minimising the risks
created by our activities, but also through
targeted investment in outputs that deliver a
positive environmental impact. To achieve our
environmental objectives, we monitor
environmental related investments to ensure
that we are on track. We do, however, face
certain challenges in balancing a reduction in
the adverse environmental impacts of our
operations with the need to meet customer
and regulator demands to grow the network
and maintain supply.
In terms of our own direct operational impact
on the environment, our principal
performance indicator is the level of carbon
dioxide emissions equivalent (tCO
2
e). This
measure covers the environmental impact
both from the use of fossil fuels in vehicles and
generators and of energy in buildings, as well
as the impact of Sulphur Hexafluoride (SF
6
), a
greenhouse gas historically used as insulation
in electrical equipment. The table on page 15
shows an analysis of our Scope 1, 2 and 3
emissions over the current and prior year.
Our “Leading the North West to zero carbon
plan” sets out our target as a 3% reduction year
on year to decrease our emissions in line with
our SBTi trajectory, page 15 outlines analysis of
the year to 31 March 2025 performance . This
includes some of the actions that we are taking
to decarbonise our operations but also
provides exemplars, research evidence and
business case information to inform the
investment decisions that stakeholders need
to take to decarbonise.
We have been working closely with key
stakeholders across the region and have
produced decarbonisation pathways for
Greater Manchester, Cumbria and Lancashire.
We continue to facilitate the journey to net
zero by preparing the electricity network for
the rapid uptake of electric vehicles (“EVs”)
and the associated charging infrastructure
needed to support this. The accelerating
uptake in low carbon technologies will
ultimately result in a lot more demand being
placed on our network, and our main challenge
is to manage the change and keep the costs as
low as we can while ensuring that our network
remains resilient, reliable and meets
customers’ needs.
Recognising our critical role in leading
decarbonisation, we have made two of our
depots and two substations carbon neutral
using a range of low carbon technologies.
These modifications have the dual benefit of
reducing our own carbon emissions and can be
used as exemplars to other businesses across
the region, sharing our learnings. Our goal for
RIIO-ED2 is to decarbonise one of our twelve
depots each year or to make efficiency savings
that target our biggest emission sources from
our estate.
We have rolled out EV charging points at all our
depots and we are incentivising colleagues to
change to EVs. We have also engaged with
local authorities and businesses across the
region to support them with this transition,
promoting the mass adoption of EV
technology.
The transition to carbon neutrality is as much
about behavioural change as it is about
technologies. In that regard, we became the
first Bronze accredited carbon literate DNO
and achieved silver accreditation in 2022. We
have developed a strategy to achieve our goal
to achieve Gold accreditation over the course
of RIIO-ED2 and, as a first step, are refining the
training to be delivered to our operational
teams as well as exploring partnership
opportunities to deliver Carbon Literacy
training to stakeholders.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
15
Strategic Report (continued)
Health, Safety and Environment (continued)
Business carbon footprint
2025
tCO
2
e
2024
1
tCO
2
e
Scope 1
Operational transport
4,453
4,448
Fugitive emissions
1,460
663
Fuel combustion
137
292
6,050
5,403
Scope 2
Buildings energy usage
3,593
3,630
Scope 3
Contractor Transport
Fuel
1,452
1,445
Company/Lease,
Personal Cars
679
589
Rail
10
7
Air
75
37
Generator Fuel
2,576
2,888
Commuting
955
N/A
Upstream Fuel and
Transport (Well-to-
Tank)
1,309
N/A
T&D and WTT
Purchased Electricity
1,183
N/A
8,239
4,966
Business Carbon
Footprint (excl. losses)
17,882
13,999
Electrical losses
2
328,413
304,723
Business Carbon
Footprint (incl. losses)
346,295
318,722
1
Prior year presentation has been amended in line with the new
SBTi methodology adopted in financial year 2025.
2
The reported electrical losses figure is a snapshot of received
data as of the date of this report and will change as further
settlement reconciliation runs are carried out (up to 28 months
after each relevant settlement date).
The Company’s business carbon footprint
(excluding losses) for the year was 17,882
tCO
2
e, which is an increase of 28% from the
previous year (2024: 13,999 tCO
2
e). This
increase was due to the Company’s transition
to a validated Science-based target (“SBTi”)
that expanded the emissions reported on.
To support the SBTi commitments the table
above has been amended to ensure more
robust reporting and accounting for carbon
emissions, which required the realignment of
emissions covered by scopes 1, 2 and 3.
Despite this adjustment the Group has
performed well against the 63% target for our
carbon emission reduction commitment by
2035. The Business Carbon Footprint uplift
SBTi equivalent for prior year would have been
18,428 tCO2e. Compared to the 17,882 tCO2e
in year ended 31 March 2025, this would
equate to a 3% reduction year on year. The
baseline reporting year for our SBTi was FY20
and we committed to the SBTi target in August
2023 with reporting expanded to include
scopes 1, 2 and 3 emissions from the beginning
of FY25. In terms of the reduction against
baseline it was 22.5% reduction compared to
the baseline year.
During the year, the Company continued to
implement energy efficiency measures,
through the refurbishment of its buildings, and
the replacement of fleet vehicles and company
cars with more efficient vehicles. Fugitive
emissions increased to 1,460 tCO
2
e (2024: 663
tCO
2
e) due to an improved inspection
methodology for asset inspections.
Around 17,353,706 kWh of electricity, equal to
around 3,593 tCO
2
e, was purchased by the
Company for its own use, including for the
purposes of transportation. This tCO
2
e figure
was calculated by multiplying the total
consumption in kWh by the UK Government
Conversion Factors for greenhouse gas
emissions.
There was around 26,127,503 kWh of energy
consumed from the consumption of fuel for
operational transport. This is calculated by
multiplying the litres of gas oil and diesel
consumed by the conversion factor provided in
the UK Government Conversion Factors for
greenhouse gas emissions.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
16
Strategic Report (continued)
Health, Safety and Environment (continued)
Business carbon footprint (continued)
To reduce our carbon footprint with respect to
operational transport, we are developing a
carbon reduction road map to maximise the
benefit of EV options for our liveried fleet.
The Company’s annual emissions are
equivalent to 7.71 tCO
2
e per employee (2024:
6.36 tCO
2
e), an increase of 1.35 tCO
2
e per
employee against last year’s emissions. It is
worth nothing that because there was no SBTi
uplift in FY24 if that year’s data was adjusted
to align with the SBTi the annual total would
have been 18,428 tCO2e with 2,201 employees
and would be equivalent to 8.37 tCO
2
e per
employee so would in fact be an 7.9%
reduction.
Electricity losses are measured as the
difference between energy entering the
network (from generation) and energy exiting
the network (for demand). Whilst it is
impossible to eliminate these losses, we do
take steps to minimise them and we will be
taking measures to reduce losses as part of our
commitment to decarbonise our operations.
This is done through installing more efficient
assets in our network, particularly low loss
transformers and cables and through our
revenue protection activities, addressing the
issue of electricity theft. However, as
electricity demand over the network starts to
increase, maintaining losses at current
absolute levels will be impossible to achieve,
with the level of emissions being determined
by the amount of renewable generation in the
mix.
Network Reliability
Our customers and stakeholders continue to
feedback that our fundamental role is to keep
power flowing through the network, reliably.
This becomes ever more important as
customer dependence upon electricity
continues to grow as we move to a low carbon
future. Network reliability continued to be high
with a network availability of 99.995% (2024:
99.995%). The year ended 31 March 2025 is
the second year of RIIO-ED2 with more
stretching targets for reliability set by Ofgem.
Reliable electricity supply is achieved by a
combination of the following:
• Investment to improve network health and
the reliability of the underlying asset base;
• Minimising the impact of interruptions by
ensuring all our systems work effectively
and restore supply within 3 minutes; and
• Physical attendance on site to operate,
restore or repair the network to restore
supplies, where required.
In the year ended 31 March 2025, the average
number of interruptions per 100 customers
(CIs) was 26.07 (2024:26.20). This outperforms
the Ofgem target 29.74 and represents the
Company’s second best ever performance. The
average number of minutes for which
customers were without supply during the
year (CMLs) to 31 March 2025 was 27.09
(2024:26.80) and this is adverse to Ofgem
target of 26.87.
Our network is designed and maintained to
withstand the external environment and other
risks to ensure it continues to operate reliably.
Reliability performance this year has been
challenged by a higher than normal volume of
weather-related faults resulting in increased
volumes of interruptions.
In FY25, there were 7 named storms in total
(2024: 13). Through learnings from prior years,
storm response improvements have been
made to significantly bolster preparation
protocols and responses. This has delivered
some best-ever ENWL responses during these
events.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
17
Strategic Report (continued)
Network Reliability (continued)
The exceptional event mechanism in our
licence protects DNOs from extreme external
events. We have submitted three exceptional
event claims; two category one and one
category two storm claims to Ofgem in line
with the exceptional event claim process in
2025. Storm Éowyn was the largest storm to
impact our region in the last ten years.
Despite the challenging weather impacts,
there have been further improvements in the
number of customers restored by automation
on both the high voltage and low voltage
networks. This performance has been driven
through a combination of investment in
automation and network resilience, as well as
improvements in pro-active operational
response. In the year, an additional 511
automation devices have been installed, which
has further bolstered our response. Also, there
has been a 43% increase in tree-cutting
resulting in 14,901 spans being cleared, thus
creating a more reliable network during
weather events.
This year further development of our network
management system (NMS) has been
implemented to improve the software
algorithm to restore customers through
automation avoiding CIs and CMLs impact.
This year there has been a significant
deployment of PRESense and LineSIGHT
equipment, connected through to our NMS
system, improving visibility of our network,
thus improving our ability to respond to
interruptions. Smart meters have been fully
integrated into NMS this year providing
visibility of the status of customers and further
enabling a proactive enhanced response.
Most customers enjoy excellent levels of
reliability, but we recognise that there is
variability in the level of service, with a small
minority experiencing a level of service
significantly worse than average, usually due to
their location or localised network issues. We
continue to invest in schemes that aim to
reduce, in the long-term, the numbers of worst
served customers (“WSC”).
The number of customers meeting this Ofgem
definition increased by 24 in the year ended 31
March 2025 to 930 (2024: 906). In RIIO-ED2,
Ofgem has defined a WSC as being one who
has experienced 12 or more unplanned HV
interruptions over a three-year period with no
less than two interruptions in any one year.
We continue to focus on our ambition to have
no customers meeting the Ofgem definition by
2028. To achieve this, we are delivering a major
proactive investment programme, delivering
substantive and sustained improvements in
performance to 27 circuits which have
previously qualified against the RIIO-ED2
threshold, benefiting 2,939 WSCs and 39,343
customers overall. Alongside this, we continue
with our tactical intervention programme,
which seeks to address any newly emerging
WSC performance issues.
Investment in an affordable and sustainable
network
In the year ended 31 March 2025, out of the
total capital expenditure of £374.0m (2024:
£290.9m) £173.2m was invested directly in
network assets (2024: £122.4m). In addition to
investment to improve the automation of the
network and to maintain safety and
environmental compliance, we have this year
significantly increased investment in additional
capacity to enable future demand aligned to
the net zero transition.
The current network has been installed over
many decades and a significant proportion of
the investment programme continues to relate
to replacing existing equipment at, or
approaching, the end of its life with modern
equivalents.
Innovation is essential to maintain our sector
leading network performance and reliability
levels and to meet the increasing demands on
electricity from the decarbonisation of energy,
at an affordable cost. We continue to develop
and deliver our cutting-edge engineering
innovation projects such as CLASS, Smart
Street and LineSIGHT that will keep the
network reliable, efficient and safe.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
18
Strategic Report (continued)
Customer
Supporting customers in vulnerable
circumstances is core to our customer strategy.
Our “Electricity Users in Vulnerable
Circumstances Strategy” ensures that the
support we are giving customers in our region
is focused appropriately.
We have continued to increase support to
customers in vulnerable circumstances,
further developing our Take Charge campaign
with Citizens Advice Manchester (“CAM”) and
Energy Saving Trust (“EST”). CAM and EST act
as our strategic partners to support fuel
poverty and energy efficiency, leveraging all
available financial support and grants to
enhance customers lives. We have continued
the support provided last year and have
delivered to 50,218 customers since the start
of RIIO-ED2. As part of the Customer
Satisfaction Fuel Poverty incentive, our
customers have rated the service 94.5% (2024:
95.3%).
We maintain our Extra Care register, to identify
those customers who are most dependent on
our services and deliver prioritised support to
them in a power cut. This year, we continued
to promote awareness of our free Extra Care
service and increase accessibility to it,
including collaboration with funded partners
has also improved our view and reach of those
who are vulnerable.
We have over 935,000 households on our
register. Our enhanced contact campaign has
increased registration in the year from 82% to
95.7% of those eligible in the region. Once
again, 386 colleagues from across the business
supported the Contact Centre to contact our
most vulnerable customers 27,681 by phone
and 2,209 through door knocking to ensure we
have the most up to date information on them
to enable the most appropriate support.
Through the continued use of partnerships,
associated referrals have increased to the
highest level to date with 150,111 customers
benefiting from the extra support provided.
Delivering excellent customer service is
incredibly important to us. Our overall
customer satisfaction score at the end of
January 2025 has seen a 0.9% increase
compared to last year at 92.9% (2024: 92.0%)
and ranked fourth DNO within the league
tables (licence area) and second overall DNO.
A roadmap of key actions focused around
reducing customer effort, simplification,
owning what we do are developed from
customer feedback and root causes analysis.
The volume of complaints received have
reduced in comparison to last year, with the
top three reasons relating to faults, multiple
interruptions, and notification of a planned
supply interruption. The overall complaints
performance metric is delivering 2.04, against
Ofgem’s target of 2.8.
The complaint metric reflects the percentage
of complaints resolved within 24 hours,
combined with the percentage of complaints
resolved within 31 days.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
19
Strategic Report (continued)
People
The Company is one of the major employers in
the North West of England, employing
approximately 2,200 people in the region. We
also work with carefully selected local delivery
partners and the supply chain to deliver our
investment plan, providing even wider levels of
employment for the region. We are committed
to building careers for our people, providing
secure, long-term employment in an inclusive
environment where everyone feels a sense of
belonging.
The Climate Survey is the measure we use to
quantify ‘how it feels to work here’ and, in
turn, makes the link between this ‘feeling’ and
how we perform. Annual surveys are
undertaken to measure engagement and levels
of agreement with our identified climate
priorities.
Colleague engagement scores in our
November 2024 survey were the highest ever
recorded by the organisation, with an
engagement rate of 83.9%. This was our
second successive highest score and a
significant improvement on prior year (82.8%).
Our colleagues rated health and safety, pride
and customer focus highest.
Following our original Investors in People
certification in April 2022, we have continued
on our good to great journey to make
significant continuous improvements in how
we engage, lead and support our people and
are extremely proud to have recently been
awarded ‘Silver’ accreditation only 2 years on
from our initial review.
We are committed to being an employer of
choice, creating a great place to work and
influencing diversity and inclusion (“D&I”) in
the energy sector. Our D&I vision is to “create
a sense of belonging for our colleagues and
truly reflect the communities we serve”. This
vision is underpinned by four key areas of
strategic focus (belonging, talent, leadership
and community), supporting inclusion in
everything we do.
Included in our people strategy is a
commitment to attract, develop and retain the
best talent to support our business strategy.
We have a particular focus on increasing
gender and ethnicity diversity in the business,
so we are reflective of the communities we
serve and harness the many benefits of diverse
teams.
Despite industry challenges around attracting
more females into our business, our gender
pay gap of 11.9% is better than the UK average
(13.1%).
Our attempts to attract more women into our
Company is a challenge experienced by many
in our industry. A part of our strategy is to
attract diverse talent through our award-
winning apprenticeship scheme. We are
pleased to report that in 2024, we have the
highest number of females in our apprentice
cohort of 28% (2024: 22%) than previous years.
Our programme has a 90% pass rate and to
date 100% of successful apprentices have been
offered full time employment with us following
completion of the apprenticeship.
We continue to strive to increase applications
from women for all our roles, last year we held
our first ‘Women at ENWL’ careers event and
plan to host more in 2025.
We continue to enhance our employee value
proposition to support our attraction strategy;
In September 2024 we enhanced our family
friendly policies which provided a significant
increase in company benefits for primary and
secondary parents, including additional
support for neonatal care and those seeking
fertility treatment.
We have experienced good progress attracting
applicants from ethnic diverse backgrounds,
over 15% of our offers are to people from
ethnically marginalised backgrounds year to
date. Ethnicity representation in our Company
has increased from 4.1% (March 2021) to 6.7%
(December 2024).
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
20
Strategic Report (continued)
People (continued)
Our colleague resource groups are maturing
with over 250 members across 9 groups. Our
colleague network groups play an instrumental
role in shaping our culture, and each group has
their own objectives and plans which are
aligned to our D&I strategy.
We have continued to build on our community
partnerships to build our brand awareness,
promote Science, Technology, Engineering and
Math (STEM) careers and ensure our job
opportunities are widely shared. We have
expanded our outreach into areas that are
difficult to recruit, for example Cumbria, and
are strengthening our presence at career and
STEM events in these areas.
We work with schools and colleges to inspire
younger generations into STEM careers. This
year we have facilitated work experience for an
all-girls school and are also running ‘Workplace
safaris’ in partnership with Greater
Manchester Combined authority. This
programme includes inviting a school to spend
half a day at our training academy where
students can learn more about who we are and
the great career opportunities available. We
ask schools who are participating to bring
along groups with at least 40% female
students.
We work with our supplier network to
champion diversity and inclusion. In addition
to including diversity and inclusion in our
procurement process, last year we facilitated a
round table event with our suppliers to
encourage inclusive action in our networks.
Our efforts to create a diverse and inclusive
workforce have been recognised by various
institutions. We have been awarded the
Bronze Inclusive Employers standard. We
continue to be a Gold Forces Friendly company
and are proud to be a Disability Confident
employer.
We have been an accredited Real Living Wage
Employer since 2019 and contract with our
supply chain to honour the real living wage
commitments for their people. We are also
proud to be a member of the Greater
Manchester Combined Authority Good
Employer Charter, and a founding partner of
the Utilities National Work Group on Modern
Slavery.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
21
Strategic Report (continued)
Corporate Social Responsibility
Our Responsibility Framework
Sometimes referred to as ESG (environment,
social, governance) or social contract, our
Responsible Business Framework (“the
Framework”) sets out our ambition for our
people and partners, our environment and our
communities.
Under the Framework we have a number of
goals which are important to our business, our
stakeholders and our colleagues. Each goal is
comprised of a series of commitments and
measures which are reported in our annual
Responsible Business Report.
The responsibility framework does not exist in
isolation. While it does not seek to include and
measure our core business and services as a
network operator, it does bring together a
number of the activities and strategies already
embedded and reported in our operations and
the business plan. In doing so it provides an
overarching indication of our activities as a
socially responsible business and how we
operate within our communities.
During the year, we have reviewed the
Framework and enhanced its alignment to the
United Nations Sustainable Development
Goals (“UNSDG”), continued to promote and
embed the Framework, and shared our
approach with our stakeholder advisory panel.
As we continue to drive forward areas of The
Framework we relaunched our primary and
secondary school education programmes.
Workshops are now available in schools across
the North West for primary and secondary
aged pupils linking national curriculum and
STEM topics (science, technology, engineering
and maths) such as circuits, important safety
messages and careers information. Our
programme creates a pathway to our skills and
recruitment programme and this September
we welcomed a further 40 apprentices
including operational engineers, design
engineers, civil engineer, mechanics, cyber
specialists and IT engineers. Since launching in
2017, more than 230 apprentices have been
trained and developed by ENWL.
We continue to make good progress with our
environmental actions, including reducing
carbon emissions and enhancing biodiversity.
In April, we completed the planting of 11,000
trees in Carlisle in partnership with
Raise:Cumbria Community Forest with work to
plant a further 10,000 trees also taking place
on additional sites during the spring 2025 tree
planting window. Our environmental action
plan, which forms part of our regulatory
business plan is on target to achieve our
business commitments for ED2.
Separately, in compliance with safety
requirements and agreed with the Health and
Safety Executive, our specialist vegetation
management teams are on target to remove
dangerous or high-risk vegetation which are in
proximity to our assets.
We continue to work with partners to support
customers in vulnerable circumstances
encourage eligible people to sign up to the
Extra Care register for additional support in the
event of a power-cut. This year we have
continued to support community and local
energy schemes across the North West with
our Powering our Communities Fund and
launched Take Charge a scheme to help those
in fuel poverty with debt advice and provide
support to those at risk of being left behind in
the energy transition.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
22
Strategic Report (continued)
Corporate Social Responsibility
(continued)
Stakeholder engagement
We are committed to stakeholder engagement
and recognise it is core to understanding our
region, supporting our communities and
meeting the requirements of our licence.
Our stakeholder engagement programme is
embedded in our business activities. We
reinforced the stakeholder advisory panel
structure for RIIO-ED2, enshrining the Ofgem
requirement for enduring customer and
stakeholder input in decision making. Our
stakeholder advisory panels, focusing on
regional business and domestic customers and
topics such as environment, along with the
Independent Oversight Panel have provided
expert insight into our business plan delivery
and reopener applications. Guidance from
Ofgem has provided greater clarity on the
stakeholder input and oversight required as we
start to develop the RII0-ED3 business plan and
the critical role that stakeholder engagement
will play in its development.
We now have six independently chaired panels
(Stakeholder Insight, Economic Growth,
Customers in Vulnerable Circumstances,
Environment and Sustainability, Distribution
System Operation (DSO) and Digital Futures),
which are all attended by a member of our
Executive Leadership Team. The panels meet
quarterly, are comprised of regional experts
and representatives of significant stakeholder
groups and provide a role as critical friend
helping to track progress against the business
plan commitments. Over 150 stakeholders
regularly give their time and experience to our
advisory panels.
The panel chairs come together in a quarterly
Independent Oversight Group (IOG), following
which, the independent chair meets with
ENWL’s CEO and Chair to raise any concerns
and opportunities directly. The IOG chair is also
a member of a wider group of independent
energy stakeholder group chairs, ensuring
national coordination.
Our annual regional stakeholder workshops
took place in November 2024 in Penrith,
Preston and Manchester. The collaboration
events aimed at local authorities and housing
associations, provided an opportunity to
explore how long-term capacity planning
aligned to local strategic economic plans and
the benefits of coordinated local area energy
planning. Additionally, there was an
opportunity to explore the connection process
and opportunities to improve the process
further.
Additional topic-specific stakeholder
engagement took place during FY25, including
events relating to the connections process,
community and local energy, net zero and
decarbonisation support, flexibility services
and DSO.
We have again undertaken an independent
stakeholder satisfaction survey to continue to
review and improve our performance. This
year we have continued to show increased
levels of overall satisfaction at 82% (2024:
79%). Nearly 180 participants responded with
a specific focus this year on expanding
participation among public sector groups. The
survey continued to indicate a strong
correlation between meaningful engagement
and frequency, and overall satisfaction, with
57% (2024: 49%) of stakeholders considering
themselves to be advocates for ENWL. Those
with dedicated contacts have the highest
satisfaction, highlighting the importance of
these relationships. Being time poor was the
biggest barrier to engagement and
stakeholders are looking for engagement to be
tailored to their needs. Stakeholder Advisory
Panel members continue to have the strongest
relationship with ENWL, confirming that the
new panel structure is working well. This
insight and information received on
stakeholder priorities and topics for
engagement will continue to feed into our
approach going forward.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
23
Strategic Report (continued)
Non-Financial and Sustainability
Information Statement
A description of the principal risks relating to
the following non-financial information is
contained elsewhere in the Strategic Report, as
indicated below:
• Environmental matters – see pages 14 to 16,
• Employees – see pages 19 and 20,
• Community issues and social matters – see
pages 21 and 22,
• Respect for human rights – see page 30,
• Anti-corruption and bribery matters – see
page 31.
Climate related disclosures
Introduction and overview
This is the Group’s second year of reporting in
respect of section 414CB of the Companies Act
2006. In the year to 31 March 2025 the Group
continued to make further progress in relation
to compliance with this reporting.
This statement includes the climate-related
financial disclosures for the Group. The Group
has a responsibility to provide a safe, reliable
and resilient electricity distribution network in
the North West of England; this activity
necessarily both impacts and is impacted by
the environment and climate change.
The Group has developed three focus areas for
its approach to climate change:
• Our Mitigation – reducing the Group’s
emissions to help reduce the scale of
climate change in the future;
• Customers’ Mitigation – helping the
Group’s customers to reduce their
emissions by providing infrastructure which
enables them to be part of the net zero
economy; and
• Adaptation – ensuring the Group’s network
continues to perform effectively and
efficiently as climate changes.
In this second year of reporting, the main focus
has been on the adaptation of the network, but
where mitigation measures are being taken,
those have also been referred to. The Group
plans to expand the reporting in relation to
mitigation measures in future versions of this
statement.
The Group reports under Defra’s Climate
Change Adaptation Reporting requirements
established by the Climate Change Act 2008,
submitting reports in 2011, 2015, 2021 and
2024 as required; these reports are available on
our website. In preparing these reports, the
Group was part of an Energy Networks
Association (ENA) working group that
developed an industry wide report on the
threats to networks from climate change and
the associated industry responses, with input
from experts from the Met Office and academia.
The working group identified 15 risks, all
relating to changing weather patterns and
temperatures. We have assessed these risks to
identify which are relevant to our distribution
area and have used these as the basis for the
climate-related elements of our risk registers
(see the Risk Management section below). Full
reports are available on the website:
https://www.enwl.co.uk/future-
energy/distribution-system-operation
The climate-related risks and opportunities
facing the Group are summarised in two
published documents, the ’Climate Change
Adaptation Report’ (as referenced above) and
the ‘Climate Resilience Strategy’. Both
documents were developed through a
consultative process, bringing together expert
knowledge from within the Group and insights
from stakeholders, industry peers, climate
experts and academia. We are committed to
updating these reports as our understanding of
climate-related risks and resilience continues
to develop.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
24
Strategic Report (continued)
Non-Financial and Sustainability
Information Statement (continued)
In the year of reporting, the Group secured
funding for additional adaptation measures in
the form of the RIIO-ED2 Storm Arwen re-
opener application. Storm events are
identified as the highest risks in the Climate
Change Adaptation reports and Ofgem
awarded the Group an additional £40m of
funding for a package of network resilience-
related measures in December 2024.
The Group continues to be committed to the
development of our network to enable
customers to adopt low carbon technologies as
set out in our business plan for the RIIO-ED2
period titled ‘Our Plan to Lead the North West
to Net Zero: 2023-2028’.
Governance
This section describes the governance
arrangements of the Group in relation to
assessing and managing climate-related risks
and opportunities, in accordance with s414CB
(a) of the Companies Act 2006.
ENWL’s Board has overall responsibility for the
alignment of strategy and risk in all areas,
including climate-related matters. During the
year the Board has delegated oversight of
matters relating to risk to the Audit and
Compliance Committee (see pages 59 to 62),
and matters relating to environmental strategy
to the Safety, Health and Environment
Committee (see page 66).
The Chief Executive Officer and Executive
Leadership Team (ELT) also have
responsibilities in relation to strategy and risk.
More information on the governance of risk
can be found on pages 43 to 50 of the Risk
Management section.
Once potential projects to improve the
resilience of the network or facilitate growth in
the use of low carbon technologies have been
identified, they are subject to a well-defined
and documented approval process, including a
Company Investment Committee (CIC) chaired
by the Chief Financial Officer.
All investment decisions, whether directly
climate-related or not, go through this process
and the potential climate impact of each
project is reviewed as part of the assessment.
The Group is also subject to scrutiny from the
regulator, Ofgem, with a range of conditions
under the Electricity Distribution Licence that
are required to be met.
Risk Management
This section describes how the Group
identifies, assesses and manages climate-
related risks and opportunities, including how
those processes are integrated into the overall
risk management process, in accordance with
s414CB (b) and (c) of the Companies Act 2006.
The Group maintains directorate level risk
registers and a corporate level risk register.
These registers are reviewed quarterly, with
any risks assessed as requiring management by
ELT moved from the directorate level registers
to the corporate level register. More
information on the corporate risk register and
the risk management framework can be found
on pages 43 to 50 of the Risk Management
section. The identification, management and
assessment of climate-related risks are fully
integrated into this process.
Once identified, climate-related risks are
assessed with reference to a range of weather
scenarios and the specifications of the assets
on our network to identify areas of particular
risk.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
25
Strategic Report (continued)
Non-Financial and Sustainability Information Statement (continued)
Climate-related risks and opportunities
This section provides a description of the principal climate-related risks and opportunities arising in
connection with the Group’s operations, along with the time periods against which they have been
assessed, in accordance with s414CB (d) and (e) of the Companies Act 2006.
As referred to above, in this second year of reporting, the main focus has been on the adaptation of
the network to ensure it continues to perform effectively and efficiently as climate changes. If we fail
to address these risks, the consequence could be increasingly frequent and prolonged interruptions
to supply.
Physical Risk: Increased frequency of extreme weather events and changing long-term climate trends
Time horizon: short (less than 5 years) to long-term (10+ years)
Likelihood: High
Response/ mitigation
Our strategy includes an action plan with the aim of
increasing the resilience of the network. The action
plan is reviewed each year by our Environment and
Sustainability Advisory Panel, a stakeholder led group.
We included resilience funding in our RIIO-ED2
submission to support this action plan.
As the flooding risk is viewed as immediate, we have
implemented a programme to protect all our major
substations against 1-in-100 year flood risk, with the
largest sites protected to 1-in-1000 year risk in line with
national guidance. In the year ended 31 March 2025
we completed flood mitigation works at 11 major sites
against a planned programme of 31 in the RIIO-ED2
period. This will ensure full compliance against the
industry flood protection specification. We are
confident in completing this programme of work by
2028.
We anticipate that whilst the performance of some of
our assets will deteriorate as the climate changes, this
will be gradual and managed as part of our network
investment programme. In assessing the risks to the
network, we have used a range of UKCP09 and UKCP18
climate projections that look to the end of the century
to assess the replacement and refurbishment
requirements for the assets on our network.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
26
Strategic Report (continued)
Non-Financial and Sustainability Information Statement (continued)
Transition Risk: net zero transition and the uncertainty in the extent of electricity demand growth
Time horizon: medium (5-10 years) to long term (10+ years)
Likelihood: Moderate
Response/ mitigation
Innovation is key to the success of our organisation and
is where novel techniques and potential solutions,
whether they be technological or commercial, are
analysed, developed, trialled and ultimately
transformed into practical solutions to deliver a better,
zero carbon service for our customers; improve
network performance and safety; and deliver ever
more efficient ways of working.
At the core of our innovation strategy is delivering
value to customers through maximising the use of
existing assets and offering new services and choice for
the future. We are generating value for customers now
by deploying proven technology providing innovative
solutions to real problems.
Transition Opportunity: Increased demand for electricity in response to decarbonisation will open
new markets and will create opportunities to invest in the network.
Time horizon: short (less than 5 years) to long term (10+ years)
Likelihood: High
Response/ mitigation
In January 2025, we made an application to Ofgem for
an additional £266.4m of allowances under the
provisions of the Load-Related re-Opener, specifically
to address network changes required to satisfy
anticipated demand requirements associated with the
net zero transition.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
27
Strategic Report (continued)
Non-Financial and Sustainability
Information Statement (continued)
Business model and strategy
This section outlines the resilience of the
Company’s business model and strategy,
taking into consideration different climate-
related scenarios, in accordance with s414CB
(f) of the Companies Act 2006.
The Company has published its ‘Climate
Resilience Strategy’ (see the Introduction and
overview section above). This strategy
includes an action plan aimed at increasing the
resilience of the network and is reviewed
annually. The RIIO-ED2 submission included an
element for resilience funding to support this
action plan.
An assessment of the resilience of the strategy
has been undertaken using a range of
scenarios. The scenarios used for electricity
and gas risk data is based on the Met Office’s
predicted 4°C degree scenario which is
suggested to occur by close of the current
century if global emissions continue unabated
at their current rate. We have not identified
any credible scenario that would force us to
change our business model or our strategy.
We do not expect climate change to have a
significant impact on our business model, as
the regulated electricity distribution network
operator in the North West of England.
Metrics and targets
This section refers to the targets and key
performance indicators (KPIs) used by the
Company to manage climate-related risks and
to realise climate-related opportunities, in
accordance with s414CB (g) and (h) of the
Companies Act 2006.
In order to support the net zero transition of
the UK economy by 2050 at an affordable cost
we expect a number of targets to be achieved
in term of innovation and investment in the
network to increase capacity.
Environmental protection continues to be one
of our core values, and we remain committed
to achieving the highest possible standards of
environmental performance. The year ended
31 March 2025 saw an improvement on our
carbon emission reduction trajectory aligned
to our verified Science-based target
commitment based on the equivalent for prior
year (see page 15), due to various carbon
reduction activities undertaken by the Group.
Actions to reduce our carbon footprint will
continue to be implemented to continue the
carbon reduction trajectory of recent years
(see page 15).
We minimise emissions by monitoring our
carbon emission footprint (refer to pages 15
and 16 for more detail) and oil loss, and are
investing to remove potentially damaging
equipment, and to enhance the environment
by undergrounding overhead cables.
Further information on the environmental
performance can be found on page 14.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
28
Strategic Report (continued)
Section 172 Statement
Introduction
Throughout this Annual Report, we illustrate
how the Board recognises the broader context
in which the Company operates, including the
consideration of: the long-term consequences
of decisions, the interests of our employees,
fostering strong relationships with customers
and other stakeholders, the impact of our
activities on our communities and
environment, maintaining a reputation for
high standards of business and the need to act
fairly as between our shareholders.
This Statement provides specific examples of
how the Company approaches these wider
considerations in its decision making.
Statement by the directors in performance of
their statutory duties in accordance with s172
Companies Act 2006
The Board of Directors consider, both
individually and together, that they have acted
in a way they consider in good faith would be
most likely to promote the success of the
Company for the benefit of its members as a
whole (having regard to the stakeholders and
matters set out in s172(1)(a-f) of the
Companies Act 2006) in decisions taken during
the year ended 31 March 2025.
Long term decision-making
Our business is about the long-term, to create
the right electricity infrastructure for the world
of tomorrow. We are very aware that what we
do now will have an impact in the future. Given
that context, we pick out some examples of
how that longer term thinking has influenced
our decision making.
The RIIO-ED2 price control period
The Board played a key role in the
development of our RIIO-ED2 business plan
and have supported and monitored its delivery
during the first two years of the period,
recognising the crucial importance of
delivering against targets to allow the business
to meet its ambitious plans, up to 2028 and
beyond.
At all times, the Board look to balance the
needs of all its stakeholders and recognised the
Company’s role in enabling the significant
changes required by long-term goals such as
net zero.
Supply chain continuity
Like all businesses, we continue to feel the
impact of pressures on our supply chains and
resources caused by global events such as the
war in Ukraine. In response, we have ensured
that we take the necessary actions and
maintain sufficient stock to mitigate these
challenges. Whilst this can increase related
costs and can accelerate the timing of incurring
those costs, these decisions have meant that
we have been able to continue to undertake
our operations and investment programmes
without disruption.
Our people
As directors, we are always aware of the
importance and efforts of our people. We
consider them in everything we do. This is
discussed further in the People section of the
Strategic Report on pages 19 to 20.
Safety
The safety of our people and the public is our
highest priority. We continually monitor safety
performance and safety culture, including
through a tailored set of performance
measures and via regular engagement on
safety with our people through colleague
surveys.
Diversity and inclusion
As explained in more detail in the People
section of the Strategic Report on pages 19 to
20, we are constantly striving to ensure that we
create a sense of belonging for our colleagues
and truly reflect the communities we serve
through our diversity and inclusion strategy.
The Board regularly discusses the progress of
our strategy and initiatives in this area.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
29
Strategic Report (continued)
Section 172 Statement (continued)
Employee engagement
We are proud to maintain Investors in People
certification, recognising our efforts to
becoming an employer of choice in the North
West. We continue to work with Investors in
People (“IIP”) to seek opportunities to
continually improve our colleagues’
experiences of working at ENWL, and we were
awarded silver status as an IIP company in
September 2024.
Annual colleague climate surveys are
undertaken to measure engagement and levels
of agreement with the Company’s identified
climate priorities. The results from the survey
and management approach to improving the
climate are outlined in the People section of
the Strategic Report on pages 19 to 20.
We recognise the value that trade unions bring
to our organisation and work closely with them
on key issues. This supplements wider
engagement activities that we undertake to
involve and inform colleagues in what is
happening across the organisation.
Future skills
We recognise the importance of investing in
our people to ensure that we develop existing
and future skills, behaviours and capabilities
across the organisation. Information on
training courses delivered in the year is
included in the Strategic Report on page 30.
Customer service focus
Delivering excellent customer service is part of
our ‘licence to operate’ and an area that the
Board monitors closely to ensure our service
levels continuously improve. Providing
additional support to electricity users in
vulnerable circumstances and fuel poverty is
core to our customer strategy.
Further information on Customers is contained
on page 18 of the Strategic Report.
Stakeholder relationships
Our relationships with stakeholders are
discussed extensively throughout this Annual
Report with more detailed information in the
Corporate and Social Responsibility section of
the Strategic Report on pages 21 to 22.
Shareholders
As highlighted in our Corporate Governance
Report (see pages 51 to 66), our business
benefits from the involvement of our
shareholders; not least, due to their
representation on the Board and through the
workshops and other meetings in which they
participate.
Impact of our operations
Our Purpose “Together we have the energy to
transform our communities” reflects the
essential role we play in the North West and in
the lives of our customers, acknowledging how
our role is changing alongside our customers’
needs.
Throughout the Annual Report, we discuss the
impact of our operations on our wider
communities, in particular by supporting
customers in vulnerable circumstances.
Leading the transition to net zero
The net zero transition will result in very
significant increases in network demand. As
the region’s electricity network operator, we
have a vital role to play, providing the capacity
to allow customers to adopt low carbon
technologies, at a price that is affordable.
Further information, including approach to the
decarbonisation of our own operations is
discussed in the Environment section of the
Strategic Report on pages 14 to 16.
The Board is very aware of its stewardship role
and the importance of protecting the North
West’s natural environment. We have put
these considerations at the heart of our
delivery plans for the RIIO-ED2 period and
beyond. Further information is contained in
our Corporate and Social Responsibility
statement on pages 21 to 22.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
30
Strategic Report (continued)
Section 172 Statement (continued)
Ethical business conduct
We expect the highest standards of conduct in
our business. This extends beyond our
Company and its people to all organisations
who work with us. During the year, the Audit
and Risk Committee in particular has overseen
the implementation of a number of new
policies and monitored ongoing compliance
with relevant legal and regulatory
requirements.
Supplier Compliance
As a business, we recognise that our customers
expect us to check the credentials of the
suppliers who work on our behalf. This is not
just about confirming that we select the right
contractors to do a given job, it is also about
making sure that the people employed by
them have completed the necessary checks to
work with us and our customers. We are now
working under a refreshed supplier vetting
processes and ongoing compliance
procedures.
Further information, including our Speak Up
policy and procedures and Code of Conduct are
discussed in the Anti-corruption and anti-
bribery section of the Strategic Report on page
31.
Workforce composition and gender diversity
Information on the composition of the
workforce at the year end is summarised
below:
Turnover
2025 – 167 leavers (2024: 163 leavers)
Training courses delivered
2025 – 1,597 (2024: 1,171)
Training course attendee sessions
2025 – 33,558
1
(2024: 19,132)
1
These figures include e-learning courses,
operational and non-operational training.
Workforce
(Male/ Female)
2025
Number
2024
Number
Total employees
1,670/ 564
(75%/25%)
1,602/ 541
(75%/25%)
Senior managers
36/ 11
(77%/23%)
32/ 14
(70%/30%)
Executive leadership
team
2
6/ 2
(75%/25%)
6/ 2
(75%/25%)
Non-Executive
Directors
6/0
(100%/0%)
7/ 2
(78%/22%)
2
The Executive leadership team figure includes two
Executive directors.
Respect for Human Rights
The Group operates exclusively in the UK and,
as such, is subject to the European Convention
on Human Rights, the UK Human Rights Act
1998 and the Modern Slavery Act 2015. The
Group seeks to anticipate, prevent and mitigate
any potential negative human rights impacts as
well as enhance positive impacts through
policies and procedures regarding employment,
equality and diversity, treating customers fairly
and information security.
The Group is a founding partner of the Utilities
National Work Group on Modern Slavery and
we achieved our Forces Friendly Gold award this
year. The Modern Slavery Act Compliance
Statement is available on the website:
www.enwl.co.uk/misc/modern-slavery-act-
compliance-statement.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
31
Strategic Report (continued)
Section 172 Statement (continued)
Anti-corruption and anti-bribery
We are proud of our strong commitment to
high ethical standards in the way we work. We
take a zero-tolerance approach to bribery and
corruption, and are committed to acting
professionally, fairly and with integrity in all
business dealings and relationships wherever
we operate, implementing and enforcing
effective systems to counter bribery. It is
important our regulators and stakeholders
have absolute confidence in the arrangements
and integrity of the organisation.
The Company operates a number of policies
governing anti-bribery and anti-corruption
matters: Anti-Corruption and Bribery Policy,
Corporate Hospitality & Gifts Policy and
Conflict of Interest Policy. We have a revised
‘Ethics in our Business’ document in place. This
includes our Ethical Framework, setting out
our expectations for all those working with us,
and a decision-making tool to assist colleagues
if faced with an ethical dilemma.
Alongside this, we have recently launched an
updated Speak Up (Whistleblowing) policy,
providing colleagues with a number of
channels to raise and escalate any concerns
they may have. An e-learning package was also
made available for all colleagues during the
year to increase understanding and awareness
of these important policies.
To support our Speak Up policy, we have in
place a confidential independent reporting
line, provided by Safecall.
We conduct regular Competition Law training
sessions for our colleagues. The completion of
these sessions is meticulously monitored to
ensure that our colleagues remain fully aware
of the latest legal requirements and adhere to
the highest standards of compliance.
All of our corporate ethics policies apply to all
employees and officers of ENWL and form part
of our Code of Conduct. Other individuals
performing functions for the Company, such as
temporary workers and contractors, are also
required to adhere to our policies.
Environment
Environmental protection continues to be one
of our core values, and we remain committed
to achieving the highest possible standards of
environmental performance. The year ended
31 March 2025 saw a reduction in our carbon
emissions, based on our Science-based target
trajectory to 2035 (see page 15). This decrease
was achieved through continued improvement
in building energy efficiency improvements
and through a more maturely developed
decarbonisation strategy. Actions to reduce
our carbon footprint will continue to be
implemented to continue the carbon reduction
trajectory of recent years (see page 26).
We minimise emissions and oil loss, and are
investing to remove potentially damaging
equipment, and to enhance the environment
by undergrounding overhead cables.
Further information on the environmental
performance can be found on page 14.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
32
Strategic Report (continued)
Key Performance Indicators
KPI
Definition and comment
Performance
Safety
Lost time
incident
frequency
rate
Definition: The total number of reportable
incidents in the year divided by the number of
hours worked in that year (by employees and
contractors), multiplied by 100,000 hours.
Performance: Reflecting the increased focus on
safety, the Company saw a reduction in lost time
incidents in the year. There was one lost time
incidents in the year, with the corresponding lost
time incident frequency rate of 0.011 (2024: 0.023).
0.011
Customer
Overall
customer
satisfaction
Definition: The overall customer satisfaction score
is a composite score from Ofgem surveys that
assesses levels of customer satisfaction for
connections quotations and delivery, interruptions
and general enquiries.
Performance: Overall satisfaction increased to
92.9% for the year, up from 92.0% in the prior year.
The score for the year was the highest in six years,
and reflecting the ongoing focus on improvements
to customer service.
92.9%
Reliability
Customer
interrup-
tions (CIs)
1
Definition: CIs represent the number of
interruptions our customers experience. It is
calculated by taking the total number of customers
affected divided by the total number of customers
connected to the network, multiplied by 100. It
excludes interruptions during exceptional events,
although there were none of these in the year.
Performance: The result of 26.1 for the year
outperforms the Ofgem target of 29.74 and
represents the Company’s second best ever
performance.
26.1 CIs
Customer
minutes lost
(CMLs)
1
Definition: CMLs represent the time customers are
without power in the event of an interruption. It is
calculated by taking the sum of the customer
minutes lost for all restoration stages for all
incidents, excluding exceptional events, and
dividing by the number of connected customers.
Performance: The result of 27.1 for the year is
adverse to the Ofgem target of 26.87 due to higher
than normal volume of weather-related faults and
the increase of planned supply interruption due to
capital investment growing.
27.1CMLs
1
The year ended 31 March 2025 figure is yet to be audited by Ofgem.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
33
Strategic Report (continued)
Key Performance Indicators (continued)
KPI
Definition and comment
Performance
People
Colleague
engagement
Definition: Colleague engagement is measured
via an employee survey which, through a series
of questions, provides details of overall
colleague engagement and how colleagues feel
about the ‘working climate’.
Performance: Overall colleague engagement
achieved an agreement score of 83.9% for the
year, a 1.1% increase from 82.8% last year, and
the highest in the last five years.
83.9% Agreement score
Sustainability
Carbon
footprint
(excluding
electrical
losses)
Definition: Carbon footprint measures the
impact of our operations on the environment
and is calculated in line with Ofgem guidance.
The calculation excludes electrical losses arising
from the operation of the network which cannot
be directly controlled or accurately measured.
Performance: To support the SBTi commitments
carbon footprint calculation methodology has
been changed leading to the nominal increase of
3,883 tCO2e on FY24. The Business Carbon
Footprint uplift SBTi equivalent for prior year
would have been 18,428 tCO2e, resulting in a 3%
reduction year on year.
17,882 tCO
2
e
Cost efficiency
Total
Expenditure
(Totex)
1
Definition: Totex is a key financial measure for
the business. It is a regulatory abbreviation
which stands for total expenditure. It includes
the money we spend on running our business
day-to-day, and the amount we invest in new
assets through our network investment
programme. We aim to deliver efficiencies in
Totex which we share with our customers and
which reduces customers’ bills.
Performance: Totex for the year ending 31
March 2025 was £449.5m compared to an
equivalent Ofgem allowance of £454.4m in
outturn prices largely due to phasing of planned
network investment programmes. Expenditure
was higher than the previous year due to
increased operational and support costs and
higher investment in operational assets.
£449.5m
1
Totex is calculated on a regulatory basis and reported to Ofgem annually on 31 July. For management reporting purposes an approximate
calculation of Totex is prepared to track performance. The final regulatory Totex figure may differ from this approximation when detailed
cost allocations are performed. The numbers for earlier years have been updated to reflect the annual submission to Ofgem.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
34
Strategic Report (continued)
Key Performance Indicators (continued)
KPI
Definition and comment
Performance
Financial KPIs
Revenue
(excluding
collection of
Supplier of
Last Resort
(SoLR levies)
Definition: Revenue is determined by Ofgem to allow
recovery of efficient costs to maintain and improve
the network, as determined as part of the price
control process. Actual revenue can vary as demand
over the network varies against forecast. Additional
revenue is generated through charges for new
connections, along with incentive revenues earned
for delivering improved performance.
As a result of SoLR claims approved by Ofgem, our
allowed revenue for the year ended 31 March 2025
was £0.8m (2024: £22.0m) higher than it would
otherwise have been, with the collection of this levy,
which is immediately paid to suppliers. Revenue in
the KPI table has been presented excluding the value
of SoLR levies collected.
Performance: Revenues have increased from the
prior year, primarily due to increases in Distribution
Use of System (DUoS) revenue. This reflects inflation
and other adjustments to allowed revenue including
the impact from incentive revenues previously
earned. The revenue over recovery for the year was
£26.5m (2024: £43.8m under recovery) compared to
allowed revenues, with the over recovery reflecting
variability against forecast consumption volumes.
This will be corrected through adjustments in pricing
in future periods.
£653.6m
Profit before
tax and fair
value
movements
(“PBTFV”)
Definition: The PBTFV of £206.8m is the profit before
tax of £248.4m (2024: £161.8m) after deducting the
£41.6m fair value gain (2024: £102.3m), per Note 9.
Performance: PBTFV has increased to £206.8m
(2024: £59.5m), mainly a result of the savings on the
accretion paid on index-linked swaps in prior year
(see Note 9) and an increase in revenue. PBTFV
excludes the significant capital investment that we
make in the network each year. Financial
performance is better understood through
comparing Totex with adjusted allowances.
£206.8m
Capital
expenditure
Definition: This represents investment in the
network to maintain its reliability and resilience for
future customers. The figure includes total additions
to property, plant and equipment and software.
Performance: We continue to invest to improve the
capacity and reliability of the network. Investment
increased this year as a number of major investment
programmes were completed.
£374.0m
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
35
Strategic Report (continued)
Key Performance Indicators (continued)
KPI
Definition and comment
Performance
Financial KPIs
RAV gearing
Definition: Regulated Asset Value (RAV) gearing is
measured as borrowings at nominal value, plus
inflation-linked debt accretion where applicable,
net of cash and short-term deposits divided by the
estimated RAV of £2,873.9m at March 2025
(2024: £2,684.6m), using the definition in our
Financing Agreements.
Performance: The RAV gearing is in line with
target and under the Ofgem guided level of 65%.
54.8%
Net debt
Definition: Net debt includes the total
borrowings, net of cash and cash equivalents and
money market deposits, as per Note 34.
Performance: The £53.5m increase in net debt
was primarily due to the combined effect of net
cash outflows of £47.8m and the indexation of
index-linked debt of £9.6m. (See page 37)
£1,433.7m
Interest
cover
Definition: Interest cover is the number of times
the net interest expense, adjusted for indexation
and capitalisation of borrowing costs, is covered
by operating profit from continuing operations, as
defined by the Financing Agreements.
Performance: Interest cover has remained at the
same level as in prior year due to the comparable
increase in both operating profit and in the
interest expense.
4.5 times
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
36
Strategic Report (continued)
Financial Performance
Overall performance reporting
Revenue is derived through the allowed
revenue set for the regulatory period, adjusted
for a number of factors including under/over
recovery of revenue in earlier years,
movements in inflation and performance
incentives earned. Under the RIIO framework,
revenue is the cash funding mechanism for the
business, including current investment
requirements as well as the repayment of past
investments, rather than the simple
recognition of income resulting from activities
that financial statements usually reflect.
Consequently, operating profit presented in
these financial statements represents the
combination of revenue that is only partly
related to actual activity during the year, less
those operating costs actually incurred, but
excluding capital expenditure.
Whilst the statutory measure that is most
closely aligned to the return to shareholders is
cash flow before financing activities, this has a
limited correlation to actual economic returns,
as a result of the factors noted above.
Financial reporting measures
Revenue
Revenue has increased by £56.3m, to £654.4m
(2024: £598.1m). Predominantly all revenue is
Distribution Use of System (DUoS) revenue,
which has increased due to the increase in
demand, inflation and allowed revenue
adjustments relating to the under recovery of
revenue in previous years.
The allowed revenue set by Ofgem is
recovered against an estimated level of
electricity demand across the network. Given
the difficulty of predicting this demand, there
is either an over or an under recovery against
planned revenue each year. In the year, there
was an over recovery of £26.5m (2024: £43.8m
under recovery), reflecting variability against
forecast consumption volumes. This over
recovery is reflected in the reported revenue
for the year and will be corrected through
adjustments to revenue to be received in two
years’ time, in accordance with Ofgem’s price
setting mechanism.
As a result of SoLR claims approved by Ofgem,
revenue was £0.8m higher (2024: £22.0m)
than it would otherwise have been. For more
information, see Note 4.
Profit before tax and fair value movements
Profit before tax and fair value movements,
comprised of profit before income tax of
£248.4m (2024: £161.8m profit) less fair value
gains of £41.6m (2024: £102.3m gains) (Note
9), has increased to £206.8m (2024: £59.5m),
£147.3m higher than prior year. This is mainly
due to the £56.3m higher revenue and the
£87.0m accretion payment in prior year, with
no accretion paid in the current year.
Accretion payments do not occur each year,
with the next due in July 2027; see Note 9 for
more details.
Profit before tax and fair value movements
provides a closer indication of underlying
performance due to the exclusion of the fair
value movements on derivatives, which do not
directly relate to the operations of the
business.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
37
Strategic Report (continued)
Financial Performance (continued)
Taxation
Corporation tax is calculated at 25% (2024:
25%) of the estimated assessable profit for the
year.
Deferred tax is calculated using the rate at
which timing differences are expected to
reverse. Accordingly, the deferred tax has
been calculated on the basis that they will
reverse in future at the 25% (2024: 25%) rate.
The overall taxation charge for the year has
increased by £20.2m to £61.9m (2024:
£41.7m).
Property, plant and equipment and software
The Group’s business is asset intensive. The
Group allocates significant financial resources
to the renewal of its network in order to
maintain services, improve reliability and
customer service, and to meet the changing
demands of the UK energy sector.
The total original cost of the Group’s property,
plant and equipment at 31 March 2025 was
£6,499.1m (2024: £6,147.5m), with a net book
value of £4,004.8m (2024: £3,785.8m). In the
year ended 31 March 2025, the Group invested
£361.8m (2024: £279.8m) in property, plant
and equipment in a large number of projects to
reinforce and improve the network (Note 11).
The Group also invested £15.2m (2024:
£11.1m) in IT systems (Note 13).
New investment is financed through a
combination of operating cash flows and debt
funding.
Cash flow before financing activities
Net cash outflow before financing activities
was £22.2m (2024: £255.8m inflow), a
difference of £278.0m. A significant element
of this difference relates to the movements on
money market deposits greater than three
months; £305.7m was returned to cash in the
prior year, with no movements in the current
year. The remaining £27.7m is a result of the
higher capital investment spend, net of the
higher inflows from operating activities,
primarily driven by the increase in revenue.
Net debt
Net debt was £1,433.7m (2024: £1,380.2m)
(Note 34). The £53.5m increase was primarily
due to the combined effect of net cash
outflows affecting net debt of £47.8m and the
indexation of index-linked debt of £9.6m.
Included in the total borrowings figure of
£1,565.8m (2024: £1,570.0m) are inter-
company loans totalling £833.4m (2024:
£831.7m), with maturity dates ranging from
March 2028 to November 2032.
Of the external debt, the following amounts
are due to be repaid in the next 12 months:
£456.4m (2024: £nil) in relation to the £250m
and £200m 8.875% 2026 bonds, £9.4m (2024:
£9.1m) under the European Investment Bank
(EIB) loans, and £2.0m (2024: £1.8m) of lease
liabilities.
All other borrowings are repayable after more
than one year and include bonds with long-
term maturities of £201.2m (2024: £656.9m),
bank loans of £59.7m (2024: £67.4m) and lease
liabilities of £3.7m (2024: £3.1m).
Note 19 provides more details on the
borrowings.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
38
Strategic Report (continued)
Financial Performance (continued)
Treasury policy and operations
During the year the Group’s treasury function
operated under Board-approved policies
without acting as a profit centre or engaging in
speculative trading activities. Its primary
objectives are to secure adequate funding in
accordance with the treasury policy and
maintain targeted headroom on key financial
ratios.
Long-term borrowings are mainly at fixed rates
that provide certainty of future cash flows or
are indexed to inflation (RPI) to match the
inflation-linked accretion to the Regulatory
Asset Value (RAV) (Ofgem have now changed
this to a Consumer Price Index including owner
occupiers’ housing costs (CPIH) basis). The
Group also holds a floating rate debt facility.
Derivative instruments are used to convert a
portion of the fixed rates to RPI-linked cash
flows, in order to better match the Ofgem debt
allowance structure (noting that Ofgem have
now changed this to a CPIH basis).
The proportion of post-hedging borrowings at
fixed, floating and index-linked rates of
interest is maintained in line with target levels
set in the Treasury Policy and is monitored by
the Board.
Cash flows are in sterling, other than sundry
purchases of plant denominated in foreign
currencies and some assets of the defined
benefit pension scheme managed by the
pension scheme investment managers. The
Group has no material exposure to foreign
currency exchange movements.
Liquidity
The Group’s funding position continues to be
strong, through focussed management of
liquidity and working capital. Budgets for the
year ending 31 March 2026, forecasts to the
end of the current regulatory period in 2028
and longer-term forecasts to 2058 are used to
assess the liquidity needs of the Group.
These forecasts demonstrate the availability of
sufficient liquidity, and headroom against all
financial compliance ratios.
Short-term liquidity requirements are met
from operating cash flows, cash balances,
short-term deposits and committed undrawn
borrowing facilities. Utilisation of undrawn
facilities is with reference to RAV gearing
restrictions; actual and forecast RAV gearing is
monitored by the Board. At 31 March 2025,
cash balances were £132.1m (2024: £189.8m)
and unutilised committed facilities were
£250.0m (2024: £50.0m), comprised of a
revolving credit facility (RCF) expiring in April
2027.
Where a liquidity need cannot be met from
existing resources, for example refinancing
existing debt or demand for additional
borrowing, the Group’s treasury function
starts the process of raising new debt at least
12 months ahead of the requirement. The
Group’s long-term debt has a range of
maturities to avoid a concentration of
refinancing risk. In the next 12 months, the
£250m and £200m 8.875% 2026 bonds are due
to mature, in March 2026. At the date these
financial statements were approved, the
intention was to refinance these using the
financial support pledged by Scottish Power UK
plc (see below). There are no further re-
financing obligations due in the next 12
months.
On 16 June 2025 Scottish Power UK plc
provided North West Electricity Networks
(Jersey) Limited (“NWEN (Jersey)”) with a
letter of support detailing the financial support
it has committed to the group headed by
NWEN (Jersey). An amount of £500.0m is
available and can be utilised by NWEN (Jersey)
and any of its subsidiaries, including the
Company. This commitment will remain in
place until the earlier of the NWEN (Jersey)
group securing alternative financing, or 12
months from the date of approval of these
financial statements, and will incur a charge of
20 basis points per annum whilst in place.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
39
Strategic Report (continued)
Financial Performance (continued)
Credit rating agencies
The Group issues debt in the public bond
markets and maintains credit ratings with
leading credit rating agencies, which were
formally reviewed and affirmed.
At 31 March 2025, ENWL was rated BBB+ with
stable outlook by Standard and Poor’s (“S&P”),
Baa1 with stable outlook by Moody’s Investors
Service (“Moody’s”) and BBB+ with stable
outlook by Fitch Ratings (“Fitch”).
The short-term debt ratings were A-2 and F2
with S&P and Fitch respectively.
Further details are available to credit investors
in the Financial Investor Relations section of
the Company’s website www.enwl.co.uk.
Derivatives
The Group uses two main groups of derivatives
to economically hedge exposure to
fluctuations in market rates over the medium
to long-term; interest rates swaps to manage
interest rate risk and inflation swaps to convert
fixed rate debt to index-linked borrowing in
order to better match the Ofgem debt
allowance methodology. All derivatives relate
directly to underlying debt. At 31 March 2024
and 2025 there were no formal hedge
accounting relationships in the Group.
Fair values
The derivatives are accounted for at fair value
through profit or loss. The unrealised fair value
movements are non-cash and will reverse over
the life of the derivative but can be significant
and result in material volatility in profit or loss.
In the current year, net fair value gains of
£41.6m have been recognised (2024: gains of
£102.3m), with the prior year being notably
higher primarily due to the fair value gain
associated with the £87.0m accretion payment
and no accretion payments in the current year
(Note 9). The fair value movements reflect
scheduled payments, volatility in the markets,
in particular, in expectations of future interest
and inflation rates.
Defined benefit pension
At 31 March 2025, the Group’s defined benefit
pension scheme had a net surplus, calculated
under IAS19 Employee Benefits, of £56.1m
(2024: £39.0m), resulting in a re-measurement
gain of £14.1m (2024: loss of £6.8m) booked
directly to other comprehensive income. The
increase in the surplus is mainly due to a
reduction in the defined benefit obligation.
This reduction was driven by favourable
market movements, including higher discount
rates and lower long-term inflation, and
changes in demographic assumptions,
particularly mortality improvements.
The most recent triennial funding valuation of
the scheme was carried out as at 31 March
2022 and identified a shortfall of £19.4m
against the Pension Trustee Board’s statutory
funding objective. A subsequent triennial
valuation as at 31 March 2025 is currently
underway; however, the process remains at an
early stage, and preliminary results are not
anticipated until the second half of 2025. In
addition to the timing of the two valuations,
the contributions made in the period and the
return on assets, the main difference is due to
the different assumptions used by IAS19 and
the funding valuation. In the event of
underfunding, the Group must agree a deficit
recovery plan with the Trustee Board within
statutory deadlines.
Dividends and dividend policy
During the year the Group’s dividend policy
was to distribute the maximum amount of
available cash to shareholders each financial
year on a semi-annual basis, after taking into
account forecast business needs, the Group’s
liquidity, gearing and rating policies,
restrictions of external and internal financing
arrangements, applicable law and ENWL’s
licence obligations. This policy will be subject
to review in the next financial year. During the
year, the Company paid dividends totalling
£45.4m (2024: £30.4m) (Note 30). The
directors do not propose a final dividend for
the year ended 31 March 2025.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
40
Strategic Report (continued)
Financial Performance (continued)
Going concern
When considering whether to continue to
adopt the going concern basis in preparing
these financial statements, the directors have
taken into account a number of factors,
including the following:
• The Company’s electricity distribution
licence includes the obligation in standard
licence condition 40 to maintain an
investment grade issuer credit rating,
which has been met.
• Under section 3A of the Electricity Act
1989, the Gas and Electricity Markets
Authority has a duty, in carrying out its
functions, to have regard to the need to
secure that licence holders are able to
finance their activities, which are the
subject of obligations imposed by or under
Part 1 of the Electricity Act 1989 or the
Utilities Act 2000.
• Management has prepared, and the
directors have reviewed and approved
Group budgets for the year ending 31
March 2026. These budgets include profit
projections and cash flow forecasts,
including covenant compliance
considerations. Inherent in forecasting is
an element of uncertainty and key
sensitivities are considered when budgets
are approved, including possible changes
in inflation and under recoveries of
allowed revenue as plausible downside
scenarios.
• Management has prepared forecasts
covering the current RIIO-ED2 regulatory
period which runs to April 2028, reflecting
the latest forecast of regulatory revenues,
performance and uncertainty
mechanisms. Forecasts demonstrate that
there is sufficient headroom on key
covenants and that there are sufficient
financial resources available to the Group
within the forecast period.
• Management has prepared liquidity
forecasts on a monthly basis, and
performed inflation sensitivities on
forecasts to June 2026, being at least 12
months from the date of approval of these
financial statements.
• Short-term liquidity requirements are
forecast to be met from the Group’s
operating cash flows and short-term
deposit balances. At 31 March 2025, there
was further available liquidity of £250.0m
in the form of committed, undrawn
borrowing facilities, available for at least
12 months from the date of approval of
these financial statements.
• During the 12 months from the date of
approval of these financial statements, the
£450m 8.875% 2026 bond is due for
repayment in March 2026, and £9.4m of
scheduled repayments are due against the
two EIB loans. In addition to the
committed, undrawn facility mentioned
above, the Group is also a beneficiary of
the £500.0m committed financial support
from Scottish Power UK plc (see below).
There are no further re-financing
obligations due in the next 12 months.
• Though the Group is largely financed by
long-term funding, any uncommitted
financing has been removed from the
assessment.
• Management prepared and considered
key sensitivities to the business plan model
when assessing going concern. These
sensitivities include incentive penalties,
macro-economic factors including inflation
at +/-1%, DUoS revenue under collection
and severe weather events.
• External factors are also considered such
as, cost of living and high energy prices,
interest rates, the Ukraine conflict and
impact on supply chain, and energy prices
and supplier administration.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
41
Strategic Report (continued)
Financial Performance (continued)
Going concern (continued)
In addition to the above, on 16 June 2025
Scottish Power UK plc provided North West
Electricity Networks (Jersey) Limited (“NWEN
(Jersey)”) with a letter of support detailing the
financial support it has committed to the group
headed by NWEN (Jersey). An amount of
£500.0m is available and can be utilised by
NWEN (Jersey) and any of its subsidiaries,
including the Company. This commitment will
remain in place until the earlier of the NWEN
(Jersey) group securing alternative financing,
or 12 months from the date of approval of
these financial statements, and will incur a
charge of 20 basis points per annum whilst in
place.
The directors have a reasonable expectation
that the Company and the Group have
adequate resources to continue in operational
existence and meet their obligations as they
fall due for the foreseeable future. In making
this assessment, the directors have considered
the foreseeable future to be a period of at least
12 months from the date of approval of the
financial statements, per the Financial
Reporting Council (FRC) guidelines.
Accordingly, they continue to adopt the going
concern basis in preparing the Annual Report
and Consolidated Financial Statements.
Viability statement
In accordance with provision 31 of the 2018 UK
Corporate Governance Code, the directors
have assessed viability over a period longer
than that required for going concern and have
chosen the period to 31 March 2028.
Whilst the Board has no reason to believe the
Group will not be viable over a longer period,
the period over which the Board considers it
possible to form a reasonable expectation as to
the Group’s longer-term viability, based on the
risk and sensitivity analysis undertaken, is the
period to 31 March 2028.
The Board has considered whether it is aware
of any specific relevant factors and notes in
particular the RIIO-ED2 regulatory framework,
Ofgem consultations and work on detailed
aspects of the regulatory settlement, including
the treatment of inflation.
The Board has considered the current
economic environment including the volatility
in interest rates and supply chain disruption,
the political environment including impacts
from the ongoing war in Ukraine in making the
viability assessment.
In reaching its conclusion, the Board has taken
into account Ofgem’s statutory duty to secure
that companies can finance their functions and
has assumed that there will be no changes to
the regulatory framework or Government
policy that will affect the Company’s viability.
The directors have conducted a robust
assessment of the principal risks facing the
Group and believe that the Group is in a strong
position to manage these risks.
In arriving at their conclusion, the directors
have considered the Group’s forecast financial
performance and cash flow, including the
Group’s ability to refinance maturing debts,
over the viability period to 2028. Headroom to
compliance ratios over the viability period has
been considered, as has the extent to which
deviations from forecast financial performance
may impact that headroom. The directors
have considered this headroom in assessing
the Group’s long-term viability.
On the basis of this assessment, and assuming
that the principal risks are managed or
mitigated as expected, the directors have a
reasonable expectation that the Company will
continue in operation and meet its liabilities as
they fall due over the three-year period of their
assessment.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
42
Strategic Report (continued)
Financial Performance (continued)
Fair, balanced & understandable
The directors have reviewed the thorough
assurance process in place within the Group
with regards to the preparation, verification
and approval of financial reports. This process
includes:
• Detailed review and appropriate
challenge from key internal Group
functions, such as Risk, Control and
Assurance, senior managers and the Chief
Financial Officer;
• Formal sign-offs from the business area
senior managers, the finance managers
and CFO;
• Audit and Compliance Committee
oversight, involving a review of key
financial reporting judgements, review
and appropriate challenge on matters
such as any changes to material
accounting policies and practices,
significant adjustments and the going
concern assumption;
• The involvement of qualified, professional
employees with an appropriate level of
expertise and experience throughout the
business; and
• Engagement of a professional and
experienced external auditor, a
framework for full transparent disclosure
of information during the audit process
and post-audit evaluation.
As a result of these processes together with
the information and assurance provided by
the day-to-day internal control processes, the
information provided by the Executive
Leadership Team of ENWL and the in-depth
reporting required by Ofgem, both the Audit
and Compliance Committee of ENWL and the
Board are satisfied that the Annual Report and
Consolidated Financial Statements taken as a
whole, provide a fair, balanced and
understandable assessment of the Group’s
position at 31 March 2025.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
43
Strategic Report (continued)
Risk Management
The Board, CEO and ELT are responsible for the
alignment of strategy and risk, and for
maintaining a sound system of risk
management and internal controls. Our
processes and systems are always evolving
with the needs of our business and have been
developed in accordance with the FRC’s
Guidance on Risk Management, Internal
Control and Related Financial and Business
Reporting.
Our Corporate Risk Register currently
encompasses a broad spectrum of risks. These
risks are evaluated in the context of our
corporate goals – Sustainability, Safety,
Financeability/Affordability, Systems and
Data, Customer/Reliability, and People. They
are monitored by a company-wide network of
Risk Champions and Coordinators. In addition,
there are risks in relation to Global Events and
Regulation.
The Company's approach to risk appetite goes
to the heart of achieving our Company goals.
As with any business, the achievement of our
goals necessitates a certain level of risk being
taken. The key is ensuring that such a scale of
change is managed with a good understanding
of the risks involved, in a manner consistent
with the Company strategy, and importantly
making sure that these risks are managed
within agreed risk appetites.
The Company has a framework in place to
define the appetite for risk which is reviewed
annually by the ELT and agreed upon by the
Board. The framework enables the Board to
demonstrate its risk appetite for the overall
strategic direction of the business and maps
risk appetite for each of our company goals at
a tactical and operational level.
Risks are only accepted when within the risk
appetite criteria, and when further mitigation
of the risk is not considered cost effective (or is
not possible).
Risk appetite varies in these areas, but in line
with the framework, the Company generally
operates within a 'cautious' to ‘averse’ risk
range, given that the achievement of the
stretching business plan would not be possible
without a level of measured risk taking. In
Sustainability, an 'averse' risk appetite is
adopted, given our desire to ensure that the
company maintains its reputation for
compliance and an ethical way of doing
business, as well as the role the Company has
in the low carbon transition.
In relation to Safety, the Company adopts an
‘averse’ risk position, placing the highest
priority on safety in all operations.
Appropriate working practices that protect our
employees, contractors and the general public
are a key priority for the business and an
important part of ensuring that we undertake
our activities safely.
Similarly, in regard to Financeability/
Affordability an ‘averse’ risk appetite has been
adopted to safeguard financial stability and
protect customers from unnecessary cost
pressures. By focusing on cost efficiency and
prudent investment, ENWL ensures that
network improvements and operational
expenses are managed responsibly.
In relation to Systems and Data the Board
adopts an ‘averse’ risk appetite to ensure the
highest levels of security, integrity, and
reliability in its digital infrastructure.
Protecting sensitive customer information and
maintaining uninterrupted network operations
are crucial priorities.
In relation to Customer/Reliability, a 'very
cautious' risk appetite is adopted to ensure
consistent performance and minimise
disruptions. By prioritising robust network
resilience and proactive customer service,
ENWL aims to meet regulatory performance
standards reflecting our commitment to
maintaining high levels of trust and reliability.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
44
Strategic Report (continued)
Risk Management (continued)
For People, the Company recognises the value
of its people and the organisational climate in
order to deliver effectively for our customers,
so a cautious approach is adopted.
The key features of the risk management
system include:
• Clear risk management strategy approved
by the Board.
• Risk appetite framework, approved
annually by the Board, in place that forms
a key driver of the strategic business plan.
• Board oversight in identifying and
understanding significant risks (and
opportunities) to the Group in achieving
strategic objectives.
• Dedicated Board and Executive
Committees to oversee the management
of risks for the Group.
• Appropriate operational and non-
operational risks being managed within a
corporate risk system.
• Target risk scores are in place for
corporate risks, with actions in place for
risk owners to progress towards achieving
the target risk scores.
• The underpinning of the corporate
register with directorate risk registers
across the business with a network of Risk
Champions and Co-ordinators which
enhance the business-wide monitoring
process.
• Development of comprehensive crisis and
reputation management plans to address
potential emergencies and maintain
public trust.
• Regular training and development
programmes for staff to ensure a strong
risk-aware culture throughout the
organisation.
• Collaboration with external stakeholders,
including regulatory bodies and industry
partners, to stay ahead of emerging risks
and regulatory changes.
Principal risks and uncertainties
In addition to the usual operational risks, such
as failing to meet customer expectations, the
most significant risks we currently face include
wider global events, cybersecurity threats, and
potential changes to the regulatory regime.
Climate change has the potential to increase
risks and uncertainties for us in relation to our
business resilience and our ability to meet the
expectations of our customers. We continue to
actively consider what this might mean for our
own activities, as well as supporting our
customers in developing their own plans to
mitigate these risks. The increased frequency
and severity of extreme weather events, such
as storms and floods, pose a threat to our
infrastructure and can lead to significant
service disruptions. Additionally, rising
temperatures may impact the efficiency and
lifespan of our equipment, necessitating
ongoing adaptation and resilience measures.
However, we have robust strategies in place to
manage these uncertainties, including
comprehensive climate adaptation plans,
regular infrastructure assessments, and
proactive maintenance schedules. Our
commitment to continuous improvement and
collaboration with industry partners ensures
that we remain well-prepared to address these
challenges effectively.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
45
Strategic Report (continued)
Risk Management (continued)
Risk
Mitigations
Global Events and
Regulat
ion
Global Events and supply chain:
Certain aspects of ENWL’s
activities could be susceptible to
the impact of wider global
events, including geo-political
tensions, the conflicts in Ukraine
and in the Middle East. These
events coupled with the UK
Government’s response
measures continue to disrupt
global supply chains. Our supply
chain continues to face
challenges arising from these
events, including inflation and
economic disruption, which also
present uncertainties for the
business
• ENWL is recognised as a Critical National Infrastructure
provider and is in regular dialogue with both the UK
Government and the Regulator to maximise the effect of
the mitigation measures on its abilities to provide an
essential service to its customers.
• Comprehensive scenario planning and business
continuity plans to evaluate ENWL's response to
potential global disruptions, including geopolitical crises,
natural disasters, and economic shocks.
• Control measures have been implemented to the extent
possible to minimise the potential impact of the
situation on ENWL’s activities and are monitored by
members of the ELT.
• Reduction in dependency on single suppliers or regions
by sourcing materials and services form a broader
network of providers.
• Implementing supplier Risk Assessments to evaluate the
supplier stability, geopolitical exposure and resilience in
order to identify vulnerabilities and develop contingency
plans.
• Forward work planning and advance ordering of
materials, such as transformers, where there are
constraints in the availability of materials or component
parts and extended delivery lead times.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
46
Strategic Report (continued)
Risk Management (continued)
Risk
Mitigations
Global
Events and Regulation
Regulation and compliance risk:
The Company is subject to a high
degree of political, regulatory
and legislative intervention,
which can impact both the
current RIIO-ED2 period, and
future regulatory settlements.
The legal and compliance
framework can change, leading
to additional compliance
obligations, market conditions,
and reporting requirements. A
changing political focus on the
sector can have a significant
effect on profitability or risk.
Compliance failure leading to an
adverse effect on the business.
• The Company has dedicated Regulation and Legal
departments that provide advice and guidance
regarding the interpretation of political, regulatory and
legislative change.
• There is ongoing engagement by the Company with the
Regulator and Government.
• There is regular engagement with the Board on political
and regulatory developments which may impact the
Company.
• Transparent reporting to ensure accurate and timely
submissions of regulatory reports demonstrating
accountability.
• Overall governance and control framework in place,
including established compliance routines and
accountabilities, owned by the Executive Leadership
Team and ultimately the Board.
• Ongoing training and awareness provided to ensure
regulatory requirements and compliance best practices
are understood and adhered to.
• Specialist teams in place to ensure compliance and
assurance is carried out.
• An internal audit programme focusing on the Group’s
key risk areas, including fraud, regulatory compliance
and business processes.
Sustainability
Responding to major events:
Events outside of our control, for
example extreme weather or
medical emergencies, affecting
large areas, may negatively
impact the business.
• Established Incident Response Group – we have
dedicated teams with clear roles and responsibilities to
co-ordinate swift and effective responses during a major
event.
• Regular simulation exercises completed to train and test
the resilience of our response to major incidents.
• Collaboration with External Partners – we have strong
relationships with emergency services, local authorities
and other utilities to ensure a coordinated response to
large scale incidents.
• The Company has comprehensive contingency plans for
network emergencies, including key contract resources
such as mobile generators and overhead line teams.
• Business continuity plans are in place and are tested and
follow a robust testing schedule to identify areas of
further improvement.
• Maintenance of inventory levels to cover larger events.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
47
Strategic Report (continued)
Risk Management (continued)
Risk
Mitigations
Sustainability
Programme delivery including
change programmes:
Delays in the investment
programme or major business
change activity leading to an
adverse impact on the Company,
particularly relating to customer
interruptions (CIs) and customer
minutes lost performance
(CMLs).
• Established governance controls in place to oversee the
delivery of business change.
• Processes in place to support delivery of change
programmes, management of risks and achievement of
business benefits.
• For activity impacting CI and CML performance, the
following mitigation measures are in place:
o Fault response times and team performance are
closely monitored including time to despatch and
mobilise response teams;
o Supply interruptions are planned to minimise
customer impact;
o Network automation to minimise the effect of
faults;
• Significant expenditure on routine maintenance to
reduce the causes of network interruption.
• Regular post investment appraisals to confirm effective
delivery of programmes and maintain lessons learnt.
• Stakeholder engagement – maintaining regular
communications with contactors, regulators and internal
teams to align expectations and address issues promptly.
Safety
Health, Safety and the
Environment:
Risk associated with unsafe
working practices, man-made or
naturally occurring hazards that
could cause harm to employees
or the wider public, or the
environment.
• Board Health, Safety and Environment Committee
oversees this area.
• Extensive policy and procedures to ensure a safe system
of work and environmental management.
• Behavioural safety training programme across all areas
of the organisation.
• Simple ‘Golden Rules’ to ensure strong safety approach
throughout the Company’s operations.
• Robust ‘lessons learned’ exercises conducted to identify
root causes when safety or environmental issues occur.
• Robust authorisation processes, policies and procedures
to control who works on the network and the activities
that they perform.
• Annual programme of audits and an inspection regime.
• Well-established hazard and safety observation
(including near miss) reporting in place.
• Regular engagement with employees and contractors to
foster a culture of safety and environmental
responsibility.
• Collaboration with external experts and organisations to
stay updated on best practices and emerging risks.
• Development of comprehensive emergency response
plans to address potential environmental and safety
incidents.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
48
Strategic Report (continued)
Risk Management (continued)
Risk
Mitigations
Financeability/
Affordability
Financial risks:
The business is subject to
treasury, tax, inflation and
liquidity risk exposures, and
under performance of the
pension scheme investments,
market impacts and/or an
increase in the scheme liabilities
which would give rise to higher
contributions.
• A formal treasury policy is in place to manage exposure
to counterparty, liquidity and market risk, overseen by
the Audit and Risk Committee.
• A well-established monthly banking covenant
monitoring process.
• Monitoring of inflation calculations on allowances,
compared to the actual inflation suffered on treasury
instruments and operations.
• Tax risk scoring.
• Active monitoring of the pension scheme’s investments
carried out on a quarterly basis.
• The pension scheme Trustee engages professional legal,
actuarial and investment advice for all decisions taken
and regularly consults with the Company, who also
engage professional advisors.
Investability: Inability to
maintain sufficient equity and
financial attractiveness to
secure the necessary funding for
critical infrastructure
investments.
• Regular engagement with credit rating agencies to
maintain a strong credit rating.
• Clear and transparent financial reports to stakeholders,
highlighting the company's financial health and
investment potential.
• Comprehensive financial planning and analysis
processes to forecast future funding needs and identify
potential financial risks.
• Active engagement in advocacy efforts to influence
favourable regulatory changes that support investment
in critical infrastructure.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
49
Strategic Report (continued)
Risk Management (continued)
Systems and Data
Cyber and physical security
threat:
Breach of our security regime
and access to key network
security systems by an
internal/external party leading
to disruption or loss of critical
systems, assets or data breach.
• Dedicated qualified personnel allocated to Cyber and IT
security.
• A comprehensive investment programme to address any
potential weaknesses and respond to arising threats.
• A training programme in place to inform all users of the
risks of email and social engineering attacks.
• A cyber risk assessment methodology implemented
within the Group.
• Pre-employment screening and ongoing checks for all
colleagues, with enhanced requirements for critical roles
such as System Administrators.
• A strong governance and inspection regime to protect
infrastructure assets and operational capacity.
• Physical and technological security measures, including
encryption of key laptops, preventing the loss of data.
• Data Centre infrastructure providing enhanced security
monitoring and management tools, ‘next generation’
firewalls and network traffic analysis.
• Ongoing security patching of critical systems.
• Ongoing renewal and replacement programmes to
ensure hardware and software is refreshed on
appropriate timescales.
• Periodic internal and external security reviews.
• Key systems IT disaster recovery testing.
• Use of e-learning to promote awareness of Cyber issues
for all employees.
• Enhanced access controls and CCTV networks to
strengthen physical security.
• Integration of advanced threat detection processes to
identify and mitigate potential cyber risks proactively.
• Routine phishing simulations to assess the effectiveness
of phishing awareness campaigns.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
50
Strategic Report (continued)
Risk Management (continued)
Risk
Mitigations
Customer/ Reliability
Network Performance and
resilience:
Aging infrastructure rising
demand, and extreme weather
events threaten network
stability, risking outages and
service disruptions
• Established customer engagement plans to maintain
regular communication during outages, providing real-
time updates, and offer support to vulnerable customers
to maintain trust and satisfaction.
• Investment in infrastructure upgrades to reinforce
critical infrastructure to enhance reliability and reduce
vulnerability to faults.
• Deploying smart grid technologies using automation
systems to detect and respond to issues in real-time,
minimising outage impacts.
• A programme of improvement activities described in
more detail on page 18 is being co-ordinated by the
Executive Leadership Team to optimise the Company’s
position against all elements of the customer
satisfaction measure.
• Robust plans in place to achieve other commitment
targets, or outperform where possible.
• Controls in place regarding the ongoing reporting of
performance against targets.
People
Developing our people:
Having an inadequately skilled
and experienced workforce to
deliver current and future
business objectives.
• Resource and succession plans are in place, which are
subject to periodic Executive and Board level review.
• Training delivered throughout the Company to ensure
employees are equipped to do their roles safely,
competently and effectively.
• Robust resourcing model is in place to meet business
needs and mitigate potential difficulty in attracting the
resources we may need across RIIO-ED2 and ED3.
• Extensive policies are in place regarding ethical conduct
within the business, including Anti-Bribery and
Corruption; Conflict of Interests; Ethics; Equality;
Internal Control and Governance; Modern Slavery and
Speak Up (Whistleblowing).
• Employee engagement – fostering a positive workplace
culture to improve retention and motivate staff to
achieve business objectives.
The Strategic Report, outlined on pages 10 to 50, has been approved by the Board of Directors and
signed on behalf of the Board on 16 June 2025.
Chris Johns
Director
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
51
Corporate Governance Report
During the year ended 31 March 2025 under The
Companies (Miscellaneous Reporting)
Regulations 2018, the Company has chosen to
report on how the principles and provisions of
the UK Corporate Governance Code (“the
Code”) have been applied during the year. There
are some limited areas of non-compliance, all of
which are considered appropriate to the
privately owned status of the Company and are
explained on pages 57 to 58.
The Board
Board Members as at 31 March 2025 are as
below:
Alistair Buchanan, CBE
Independent Non-Executive Director
Appointed on 25 July 2018
Alistair Buchanan has over 25 years’ experience
in the energy industry, including 10 years as
Chief Executive of Ofgem. In 2013 he joined
KPMG as Partner and UK Chair of Power &
Utilities, returning to the firm where he trained
as a Chartered Accountant. During his career,
Alistair became an award-winning energy sector
analyst and head of research for banks in New
York and London. With experience at Board level
on various companies, he currently also serves
as the Chair of the leading period orchestra “The
Mozartists”.
Keith Anderson
Non-Executive Director
Appointed on 22 March 2025
Keith Anderson is Chief Executive Officer for
Scottish Power and he also sits on the Scottish
Power Board, where he was appointed in
February 2012. Keith has full responsibility for
the Scottish Power’s activities in the UK
including the £24bn investment plan to 2028
designed to strengthen the position of the
company as the Utility of the Future. Under the
previous Government, Keith was a member of
the Prime Minister’s Business Council and the
UK Investment Council.
Prior to joining Scottish Power, Keith worked
with some major financial institutions including
The Royal Bank of Scotland and Standard Life, as
well as working as a management consultant
with Ernst & Young LLP.
Harold Hutchinson
Independent Non-Executive Director
Appointed on 22 October 2024
Harold Hutchinson was born in Belfast and has
degrees from the University of St. Andrews,
Scotland (M.A. Hons. Economics/French), and
University of Oxford (M.Phil. Economics). He
spent his early career in academia as a lecturer
in economics at St. Andrews University. He was
subsequently a top-rated research analyst in the
energy and utilities sectors for over 25 years at
various investment banks, most recently at
Investec Bank plc, where he was a Managing
director in the Listed Client Group and Head of
UK Equity Research. Currently, he is a Senior
Adviser in Alternative Energy at Investec Bank
plc. In addition, he is a Trustee and Director at
the Regulatory Policy Institute, Oxford, an
educational charity dedicated to the promotion
of regulatory and market research for the public
benefit.
Charles Langan
Non-Executive Director
Appointed on 22 March 2025
Charles Langan was appointed Scottish Power’s
Chief Financial Officer in July 2024, responsible
for providing strategic financial leadership of
Scottish Power and day-to-day management of
the Finance function. Charles is also responsible
for the IT, Security, Procurement and General
Services functions. Since joining Scottish Power
in 2005, Charles has held several senior finance
positions both in the UK and Spain.
Charles is a member of the Institute of Chartered
Accountants of Scotland and has a degree in
Accountancy and Finance from the University of
Strathclyde. Prior to joining Scottish Power,
Charles worked at Ernst & Young LLP.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
52
Corporate Governance Report (continued)
The Board (continued)
David Mesonero
Non-Executive Director
Appointed on 22 March 2025
David Mesonero is currently the Global Head of
Corporate Development and M&A of Iberdrola,
S.A. He is member of The Board of Directors of
Iberdrola Mexico, Iberdrola Energía
Internacional, and its Audit Committee. He is a
member of the Finance Committee of
Neoenergia and a member of the Board of these
societies: Windar Renewable and Wallbox.
Prior to his role in Iberdrola, David was CFO of
Prisa Group, and CFO at Siemens Gamesa
Renewable Energy. He has a background as a
strategic consultant and investment banker and
specializes in capital markets and in designing
different financing structures.
Masahide Yamada
Non-Executive Director
Appointed on 7 July 2022
Masahide Yamada is employed by the Kansai
Electric Power Company Inc. which is an electric
utility with its operational area of Kansai region,
Japan. He is the General Manager for Asset
Management, Americas and Europe Region,
International Business Division. Masahide has 10
years’ experience in the field of power
distribution, with more than 10 years’
experience in overseas investment in power
assets including as a Finance Director of a
hydropower project in the Republic of
Indonesia, and some experience with Strategy,
Planning and Budget Management.
Ian Smyth
Executive Director - Group CEO
Appointed on 5 September 2022
Ian Smyth has been Group CEO of Electricity
North West Limited since 2022. Prior to
Electricity North West, Ian was a Director of UK
Power Networks, a Managing Director of
Navigant a global advisory and dispute
resolution consultancy and the lead partner of
the Utilities and Regulated Industries practice
for LCP. He has been a consultant for Ernst &
Young LLP. Ian has worked internationally for
governments, regulators and utilities across
electricity, gas and water. Ian has a BA(Hons) in
philosophy, psychology and artificial intelligence
from Manchester Metropolitan University and
an MSc in Cognitive Science from the University
of Birmingham.
Chris Johns
Executive Director - Group CFO
Appointed on 25 May 2023
Chris Johns joined Electricity North West Limited
as Group CFO (Chief Financial Officer) in May
2023. Chris is a Chartered Accountant and has
previously been CFO of Yorkshire Water, a role
he held from June 2020. He has also previously
held the roles of Finance Director of both
Northumbrian Water Group and Northern Gas
Networks.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
53
Corporate Governance Report (continued)
The Board (continued)
Shareholder appointed and shareholder
nominated directors
Keith Anderson, Charles Langan, David
Mesonero (all appointed to the Board on 22
March 2025) and Masahide Yamada are
shareholder appointed directors.
Beatrice Araujo and Harold Hutchinson (both
appointed to the Board on 22 October 2024)
were shareholder nominated directors.
Beatrice Araujo resigned from the Board on 21
March 2025.
Harold Hutchinson converted to an Independent
Non-Executive director effective from 21 March
2025, and furthermore named to Ofgem as
fulfilling the role of a Sufficiently Independent
director as required by Ofgem.
Mitsuo Wada was a shareholder appointed
director until he resigned on 21 March 2025.
Michiko Hara was the appointed alternate
director for Mitsuo Wada during his time as a
Board member. Michiko Hara resigned on 21
March 2025.
Makoto Murata is the appointed alternate
director for Masahide Yamada.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
54
Corporate Governance Report (continued)
The Board (continued)
Attendance at Board meetings
At the discretion of the Board, senior management were invited to attend meetings when appropriate
specific items were subject to discussions. Where a director was unable to attend a Board meeting,
their views were canvassed by the Chair prior to the meeting.
The table below shows Board attendance, and Board Committee attendance for committee members
only. Informal meetings to discuss board member replacements are not included, nor are attendances
by directors at committee meetings where they are not formal members.
Board Member
Attended / Scheduled
ENWL
Board
Audit and
Risk
Committee
Remuneration
Committee
Nominations
Committee
Safety, Health
and Environment
Committee
Keith Anderson
1
1/1
-
-
-
-
Beatrice Araujo
2
3/4
-
1/2
-
1/1
Anne Baldock
3
8/8
5/6
4/4
1/1
3/3
Alistair Buchanan
9/9
-
4/4
1/1
-
Susan Cooklin
4
7/8
6/6
-
-
3/3
Rob Holden
5
8/8
6/6
-
-
-
Harold Hutchinson
6
5/5
-
2/2
-
2/2
Chris Johns
9/9
-
-
-
-
Siôn Jones
7
2/4
-
1/2
0/1
-
Charles Langan
8
1/1
-
-
-
-
David Mesonero
9
1/1
-
-
-
-
Peter O’Flaherty
10
4/4
-
2/2
1/1
1/1
Genping Pan
11
2/4
-
1/2
0/1
-
Ian Smyth
9/9
-
-
-
3/3
Mitsuo Wada
12
7/8
-
0/2
-
-
Masahide Yamada
8/9
-
4/4
1/1
2/3
1
Appointed as director on 22 March 2025 and attended the only Board meeting during the period.
2
Appointed as director on 22 March 2025 and resigned on 21 March 2025 but had attended 3 of the 4 Board meetings during the period.
3
Resigned as director on 21 March 2025 but had attended all previous Board meetings during the year until this date.
4
Resigned as director on 21 March 2025 but had attended 7 of the 8 Board meetings during the year until this date.
5
Resigned as director on 21 March 2025 but had attended all previous Board meetings during the year until this date.
6
Appointed as director on 22 October 2024 and had attended all of the Board meetings during the period.
7
Resigned as director on 22 October 2024 but had attended 2 of the 4 Board meetings during the year until this date.
8
Appointed as director on 22 March 2025 and attended the only Board meeting during the period.
9
Appointed as director on 22 March 2025 and attended the only Board meeting during the period.
10
Resigned as director on 22 October 2024 but had attended all previous Board meetings during the year until this date.
11
Resigned as director on 22 October 2024 but had attended 2 of the 4 Board meetings during the year until this date.
12
Resigned as director on 21 March 2025 but had attended 7 of the 8 Board meetings during the year until this date.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
55
Corporate Governance Report (continued)
The Board (continued)
The Audit and Risk Committee was terminated
by the directors of the Board on 23 March 2025,
and replaced by the Audit and Compliance
Committee with effect from the same date. The
Remuneration Committee, Nominations
Committee and Safety, Health and Environment
Committee were terminated by the directors of
the Board on 23 March 2025 with all of their
respective powers, duties, and obligations
returning to the Board of Directors as necessary.
Diversity
The Board supports diversity in its broadest
sense and accordingly aims to ensure that its
number is made up of a diverse range of
experience, independence and expertise
appropriate to the industry in which it operates,
its operational business model and the extensive
financial, governance, regulatory risk
management and legal expertise required.
Diversity of the Board continues to be assessed
on a case-by-case basis as vacancies arise.
Composition
The Board comprises two Non-Executive
Directors (including the Chair) considered under
the Code to be Independent, and four Non-
Executive Directors representing the
shareholders, together with two Executive
directors. The Directors’ biographies are on
pages 51 to 52.
The two Independent Non-Executive directors,
Alistair Buchanan and Harold Hutchinson, have
been named to Ofgem as fulfilling the role of
Sufficiently Independent directors as required
by Ofgem. The role of the Sufficiently
Independent director was introduced from 1
April 2014 as part of a range of enhancements
made to the ring-fence conditions in the
Company’s licence to protect consumers, should
a distribution operator experience financial
distress.
The individual directors are regularly asked to
confirm that they are able to discharge their
responsibilities on appointment and thereafter,
in light of any other commitments or outside
appointments they may have.
Leadership
The Board provides leadership of the Company,
ensuring it continues to balance the needs of
stakeholders while delivering the Company’s
strategy. Individually the directors act in a way
that they consider will promote the long-term
success of the Company.
The role of the Chair and the CEO is separate,
defined by clear role descriptions set out in
writing and agreed by the Board.
The Chair is responsible for the leadership and
governance of the Board, and the CEO for the
operational management of the Company and
implementation of the strategy on the Board’s
behalf. The CEO is assisted by his ELT that
comprises the operational unit directors.
Advice
All directors are able to consult with the
Company Secretary, and the appointment and
removal of the Company Secretary is a matter
reserved for the Board.
Any individual director, or the Board as a whole,
may take independent professional advice
relating to any aspect of their duties at the
Company’s expense.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
56
Corporate Governance Report (continued)
The Board (continued)
How the Board operates
The Board’s role is to promote the long-term
success of the Company and provide leadership
within a framework of effective controls. The
Board is responsible for approving the strategy
and for ensuring that there are suitable
resources to achieve it. In doing so, the Board
takes into account all stakeholders, including its
shareholders, employees, suppliers and the
communities in which it operates.
The Board has matters specifically reserved for
its decision, including the approval of budgets
and financial results, assessment of new Board
appointments, dividend decisions, litigation
which is material to the Group, and directors’
remuneration. From 23 March 2025 these
matters are now dealt with by North West
Electricity Networks (UK) Limited Board.
Training
The Chair is responsible for ensuring that all
directors update their skills, knowledge and
familiarity of the Company.
Directors regularly receive reports facilitating
greater awareness and understanding of the
Company, its regulatory environment and the
industry. The Board aims to have at least two
workshops and one strategy meeting a year
aimed at developing a greater understanding of
the Company’s finances and operations and to
explore strategic matters in detail.
Committee members received detailed
presentations at meetings focusing on areas of
relevance to the Committee and Board
members are invited to workshops with
shareholder representatives who are able to
delve into areas of interest in greater detail.
The Chair is also responsible for ensuring that all
new directors receive a tailored induction
programme that reflects their experience and
position as either an Executive or Non-Executive
director. This involves meetings with the Board,
the Company Secretary, other members of the
Executive and Senior Leadership Teams and site
visits. Additional documentation is provided as
appropriate.
Appointments
The two independent Non-Executive directors
are provided with a detailed letter of
appointment.
The four other Non-Executive directors are
appointed by the Company’s shareholders as
their representatives.
Conflicts of interest
The Board has appropriate processes in place to
assess and manage any potential conflicts of
interest. As part of these procedures the Board:
• Considers conflicts of interest as part of the
agenda for all meetings.
• Asks directors annually if there are any
changes to their conflict of interest
declarations, including appointments to the
Boards of other entities.
• Keeps records and Board minutes regarding
any decisions made.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
57
Corporate Governance Report (continued)
The Board (continued)
Areas of non-compliance with the Code
There are some areas where the Company did
not comply with the Code during the year, all of
which are due to its privately-owned status and
are discussed below. The Company has
endeavoured to comply with the spirit of the
Code; nevertheless, as outlined below,
compliance with certain provisions is either
impractical or inappropriate.
Senior Independent Director
The Board has not appointed a Non-Executive
director as a Senior Independent director under
the Code. The Board meets the objectives
behind this requirement through its shareholder
representation on the Board.
Composition of the Board
The Code states that half the Board should be
independent Non-Executive directors. In light of
the composition of the Board explained above
on pages 57 to 58, the Company does not satisfy
this requirement. However, as the Company is
privately-owned and all shareholders are
represented on the Board, it is felt that the
needs of shareholders are met through their
presence on the Board.
The Board considers that the two Independent
Non-Executive directors offer an appropriate
perspective, meaningful individual participation
and effective collective decision making.
Annual election of directors
The Board does not require its directors to be re-
elected annually as the shareholder
representation on the Board allows the
opportunity to challenge a director’s
performance directly rather than at an Annual
General Meeting.
Publication of the terms and conditions of Non-
Executive Directors
As a privately-owned company, the Company is
not required to provide a remuneration report
in line with the Large and Medium Sized
Companies and Groups (Accounts and Reports)
(Amendment) Regulations 2013.
The purpose of the remuneration report is to
enable shareholders to exercise judgement over
directors’ remuneration. With the presence of
shareholder representatives on the
Remuneration Committee, this purpose is met
directly.
Engagement with stakeholders
As a privately-owned company, the Company
does not have a large or dispersed shareholder
base with which to communicate formally, nor
are there any minority shareholders. Therefore,
Annual General Meetings are not held.
Shareholders
The Group works closely with its shareholders
and see their stewardship commitments as a key
feature of their investment philosophy.
They are committed to maintaining the integrity
and quality of the markets in which they operate
and allocate investment capital to productive
purposes, while protecting and enhancing their
clients’ capital over the longer term.
Workforce
The Board has not utilised the methods in the
Code for engagement with the workforce.
However, the workforce has a strong Trade
Union representation and regular meetings of
engagement take place both with
representatives and directly through workforce
meetings with the leadership team.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
58
Corporate Governance Report (continued)
The Board (continued)
Areas of non-compliance with the Code
(continued)
Stakeholders
The Company has strong and open relationships
with stakeholders, including Ofgem, MPs and
central government, local government, and
emergency services. There are a number of key
relationships and a vast range of public sector
stakeholders. The Company also engages across
the industry with electricity suppliers,
employees, contractors and other utilities, along
with research of customers’ opinions. Due to the
regulated nature of the industry the Company
has less flexibility to determine some of its
engagement mechanisms with stakeholders.
Our stakeholder engagement strategy is
outlined on page 22.
Board evaluation
The Code requires boards to conduct an annual
evaluation of their effectiveness, with such
evaluation being externally facilitated every
three years for FTSE 350 companies. Although
the Company does not undertake an annual
exercise, externally led board evaluations are
performed on a periodic basis as deemed
appropriate. The last one conducted by
Lintstock Limited was in 2021. The Chair of the
Board will consider later in 2025 when may be
an appropriate date to undertake the next
effectiveness evaluation.
Internal audit team
The Company’s internal audit team provides
independent, objective assurance and advisory
services designed to improve the Company’s
(and members of its group where applicable)
operations. Internal audit activity helps the
business achieve its objectives by evaluating and
improving the effectiveness of risk
management, control and governance
processes.
Nomination Committee
The Code requires a majority of the members of
the Nomination Committee to be independent
Non-Executive directors.
Notwithstanding that the Company’s
Nomination Committee is not so constituted,
during the year the Board considered that the
Committee had the necessary mix of skills,
expertise and experience to discharge its role of
leading the process for appointments and
ensuring appropriate plans were in place for
succession to the Board and senior management
positions. Additionally, it is felt that the interests
of shareholders have been properly reflected by
means of their representation of the
Committee.
Remuneration Committee
The Code also states that the Remuneration
Committee should comprise only independent
Non-Executive directors.
Again, as the Company is privately-owned and
has no external shareholders, during the year
the Board believes that the interests of
shareholders had been appropriately
represented on the Committee and that the
Committee was suitably constituted to
discharge its functions in relation to the
alignment of remuneration policies and
practices to the long-term sustainable success of
the Company.
The Nomination and Remuneration Committees
were terminated by the Board on 23 March 2025
with all of their respective powers, duties, and
obligations returning to the Board of Directors
as necessary.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
59
Corporate Governance Report (continued)
Board Committees
During the year the Board had delegated the
detailed oversight of certain items to four
standing Committees and three ad hoc
Committees until they were terminated by the
Board on 23 March 2025 with all of their
respective powers, duties, and obligations
returning to the ENWL Board of Directors as
necessary.
The Audit and Risk Committee was terminated
by the directors of the Board on 23 March 2025,
and was replaced by the Audit and Compliance
Committee with effect from the same date.
Standard Committees which generally met
on a regular pre-planned cycle
Audit and Risk Committee
Remuneration Committee
Nominations Committee
Safety, Health, and Environment Committee
Ad hoc Committees meeting as required to
deal with their specific areas of business
Use of Systems Pricing Committee
Finance Committee
Sustainable Financing Committee
The minutes of each Committee are made
available to the Board.
The Use of Systems Pricing Committee met
annually (or more frequently as necessary) to
discuss customer bills. The Finance Committee
met on an ad hoc basis, to approve detail about
system pricing contained in Licence Condition 14
and financing transactions respectively. The
Sustainable Financing Committee met on an ad
hoc basis, to advise the Company on eligible
green spend, in accordance with the Company’s
Green Financing Framework.
Report of the Audit and Risk Committee
The Audit and Risk Committee was terminated
by the Board on 23 March 2025, and replaced by
the Audit and Compliance Committee with
effect from the same date.
The role and responsibilities of the Committee
were set out in its Terms of Reference which
were reviewed by the Committee and approved
by the Board annually and were amended on 23
March 2025.
Membership and meetings
The Committee members were all Non-
Executive directors. The Board was satisfied that
the Committee Chair, Rob Holden, as a
Chartered Accountant, had relevant financial
experience. The Committee as a whole had
experience relevant to the sector in which the
Company operates. Attendance by individual
members is detailed on page 54.
The role of the Committee
The key responsibilities of the Audit and Risk
Committee were to:
• Monitor the integrity of the financial
statements, including annual and half-yearly
reports and to report to the Board significant
financial reporting issues and judgements
which they contain.
• Monitor the independence, effectiveness
and remuneration of the external auditor.
• Review the adequacy and effectiveness of
the Company’s internal financial controls and
internal control and risk management stems
and compliance with the Code.
• Monitor the effectiveness of the Company’s
internal audit function.
• Ensure that the Group’s treasury function is
effective and approve treasury transactions
in line with the Treasury policy.
• Conduct audit tender processes and make
recommendations regarding the
appointment and removal of the external
auditor and any engagement terms. Monitor
and ensure the appropriate use of the
external auditor for any non-audit services.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
60
Corporate Governance Report (continued)
Report of the Audit and Risk Committee
(continued)
The significant matters considered by the
Committee during the year included:
• The initial review of the 31 March 2025
Annual Report and Consolidated Financial
Statements and the review of the FY25 half-
year report.
• Evaluation of external audit work by
PricewaterhouseCoopers LLP (“PwC”)
(including the initial discussion of fees and
management response to audit reports) and
developing the future audit programme.
• Review and evaluation of the auditor
independence following the Iberdrola
acquisition.
• Review of the going concern basis of
preparation and the letter of support
provided by Scottish Power UK Plc.
• Review and discussion on internal risk
management controls and enhanced
governance frameworks.
• Review of Treasury operations and Data
Protection Officer's reports.
The following notes for the Audit and Risk
Committee shall also apply to the Audit and
Compliance Committee, as detailed below on
page 62.
Committee effectiveness
The Committee formally reviewed its Terms of
Reference and its membership during the year
to ensure both remain fit for purpose and were
considered effective by the Board.
Internal control framework
The Committee, on behalf of the Board, was
responsible for reviewing the Company’s
internal control framework. This review is
consistent with the Code and covers all material
areas of the Group, including risk management
and compliance with controls. Further details of
risk management and internal controls are set
out on pages 43 to 50.
Whistleblowing arrangements
The Committee is responsible for reviewing the
Company’s Disclosure (Whistleblowing) policy
and any concerns raised through these channels
and management actions taken in response. A
revised policy was approved by the Audit and
Risk Committee in January 2021 and a new
Speak Up policy was approved in December
2021 and has been reviewed annually
thereafter. A confidential service is provided by
an external company whereby employees can
raise concerns by email or telephone in
confidence. Any matters reported are
investigated and escalated as appropriate.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
61
Corporate Governance Report (continued)
Report of the Audit and Risk Committee
(continued)
External audit
The external auditors are engaged to express an
opinion on the Company and Group financial
statements. The audit includes the review and
testing of the data contained in the financial
statements to the extent necessary for
expressing an audit opinion on the truth and
fairness of the financial statements. This year’s
audit is undertaken by PwC, who will be stepping
down as independent auditors, and auditors of
Iberdrola Group who will be proposed for
appointment as the statutory auditor of the
Company.
In accordance with UK regulations, the
Company’s auditor adheres to a mandatory
rotation policy and a new Group lead
engagement partner is appointed once their
predecessors have completed a term of five
years.
To assess the independence and effectiveness of
the external audit process, the Committee
reviewed the audit approach and strategy and
the final PwC report to the Committee, as well
as receiving verbal feedback from the Board.
Auditor independence and the provision of
non-audit services
The Company has a formal policy on the use of
the auditor for non-audit work and the awarding
of such work is managed in order to ensure that
the auditor is able to conduct an independent
audit, and is perceived to be independent by our
stakeholders.
As a result of the acquisition of the NWEN
(Jersey) group by Iberdrola in October 2024, a
complex issue has arisen with regards to the
independence of PwC as auditors for the NWEN
(Jersey) group, including the Company, as PwC
provides critical non-audit services to companies
in the wider Iberdrola group. A market search
was carried out, however no suitable alternative
auditor was found. As a result, the Transitional
Relief set out in Paragraph 1.27 of the FRC
Ethical Standards 2019 was used to allow PwC to
complete the audit for the year ended 31 March
2025. Although Iberdrola acquired 88% of the
NWEN (Jersey) equity on the 22 October 2024,
the CMA’s Initial Enforcement Order (“IEO”)
prevented Iberdrola from influencing the
operations or business of the NWEN (Jersey)
group, including the Company. Based on this it
was concluded that Iberdrola was only a
controlling entity after the CMA released the
restrictions of the IEO on the 20 March 2025,
and at this point the 3-month period under the
Transitional Relief would commence. The PwC
audit has been concluded within this period.
In keeping with professional ethical standards,
PwC also confirmed their independence to the
Committee with regards to the NWEN (Jersey)
group and set out the supporting evidence in
their report to the Committee prior to the
publication of the Annual Report and
Consolidated Financial Statements.
The non-audit services provided by the statutory
auditor during the year to the NWEN (Jersey)
group were in connection to Ofgem regulatory
requirements and financial covenant
compliance.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
62
Corporate Governance Report (continued)
Report of the Audit and Risk Committee
(continued)
Fair, balanced and understandable
The Audit and Risk Committee was requested to
assist the Board in confirming that the Annual
Report is fair, balanced and understandable. As
part of its review, the Audit and Risk Committee
took into account the preparation process for
the Annual Report and Consolidated Financial
Statements:
• Detailed review and appropriate challenge
from key internal Group functions, such as
Risk, Control and Assurance, senior
managers and the CFO.
• Formal signoffs from the business area
senior managers, the finance managers and
CFO.
• Audit and Risk Committee oversight,
involving a review of key financial reporting
judgements, review and appropriate
challenge on matters such as any changes
to material accounting policies and
practices during the year, significant
adjustments and the going concern
assumption.
• The involvement of qualified, professional
employees with an appropriate level of
expertise and experience throughout the
business.
• Engagement of a professional and
experienced external auditor, a framework
for full transparent disclosure of
information during the audit process and
post audit evaluation.
The Directors’ Statement on a fair, balanced and
understandable Annual Report and
Consolidated Financial Statements is set out on
pages 70 to 71.
Report of the Audit and Compliance
Committee
The Audit and Compliance Committee replaced
the Audit and Risk Committee, which was
terminated by the Board on 23 March 2025.
The role and responsibilities of the Committee
are set out in its Terms of Reference.
Membership and meetings
The Committee members are all Non-Executive
directors. The Board is satisfied that the
Committee Chair, Harold Hutchinson, has
relevant knowledge and financial experience.
The Committee as a whole have experience
relevant to the sector in which the Company
operates.
No meetings of the Committee were held during
the part of the financial year since it was
established. A minimum of four Committee
meetings are scheduled for the year
commencing 1 April 2025.
The role of the Committee
The key responsibilities of the Audit and
Compliance Committee are to:
• Monitor the financial and non-financial
information preparation process for the
Company;
• Oversee the independence, activities and
efficiency of the internal audit function;
• Oversee and review the activities of the
Company’s compliance unit;
• Monitor the statutory audit of the annual
report and accounts of the Company; and
• Monitor the independence of the Group’s
external auditor and recommend to the
Board the appointment of the external
auditor and their associated terms of
engagement.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
63
Corporate Governance Report (continued)
Report of the Nominations Committee
The role and responsibilities of the Committee
were set out in its Terms of Reference. The
Committee’s responsibilities included keeping
under review the composition of the Board and
senior executives, identifying and nominating
candidates for approval by the Board to fill any
vacancies and succession planning for directors
and other senior executives.
The Nominations Committee was terminated by
the Board on 23 March 2025 with all of its
powers, duties, and obligations returning to the
Board of Directors as necessary.
Membership and meetings
The Committee Chair was Alistair Buchanan,
Independent Non-Executive director.
Composition of the Committee and attendance
by individual members at meetings is detailed
on page 54. The Chief Executive Officer and
external advisors attend meetings at the
invitation of the Chair of the Committee.
The Nominations Committee held one meeting
during the year.
Diversity
As described in the Corporate Governance
report on page 55, the Board is committed to
diversity in its broadest sense and the
Nominations Committee ensured this remained
central to recruitment and succession planning.
The Committee typically undertook an annual
review to assess the Company’s planning for
succession to executive and senior management
roles.
Report of the Remuneration Committee
The Committee’s role was to determine the
remuneration structure for the Executive
directors and Board to ensure that it balances
appropriate reward with the creation of long-
term value, customer performance and
sustainability of the network.
It was also responsible for the review of the
remuneration of other members of the ELT to
ensure the structure and levels of remuneration
appropriately incentivise these individuals to
achieve the Company’s strategic objectives.
As required by the Code, the Company engages
directors on terms which do not reward poor
performance and, where necessary, require
directors to mitigate their losses.
Whilst the Company does not currently directly
engage its workforce in relation to executive
remuneration, there is information available
internally and externally regarding the key terms
of such remuneration.
When the Company’s CEO attended (by the
Committee’s invitation) the Committee meeting
held during the year, the CEO did not attend any
discussions in which he was individually
discussed.
Membership and meetings
The composition of the Committee and
attendance by individual members is detailed on
page 54.
The key areas of focus for the Remuneration
Committee during the year were:
• Company performance update and
executive incentive plan update.
• Executive bonus approvals and director
remuneration.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
64
Corporate Governance Report (continued)
Report of the Remuneration Committee (continued)
Role of the Committee
The Committee reviewed and approved the overall remuneration policies for employees below director
level but did not set remuneration for these individuals. This oversight role allowed the Committee to
take into account pay policies and employment conditions across the Group.
The Committee has reviewed the appropriateness of the remuneration structure for the RIIO-ED2
regulatory period and, subject to some changes, determined that it continues to promote the long-term
success of the Company.
Share options are not offered as an incentive to either Executive or Non-Executive directors as the
Company is privately-owned.
Nature of remuneration of Executive directors
The table below sets out the nature of the remuneration of the Executive directors:
Element
Purpose and link to strategy
Framework
Basic Salary
Basic salary provides the core reward
for the role. Salaries are set at a
sufficient level to attract and retain
high calibre individuals who can deliver
the Group’s strategic objectives.
External advice is taken on all
remuneration to ensure that it remains
effective and appropriate. Levels of
basic salary are benchmarked and will
also reflect the director’s experience
and time at director level.
Benefits
Other benefits provided are designed,
as with basic salary, to provide a
competitive but not excessive reward
package.
In addition to basic salary, directors are
provided with a car allowance and are
offered private medical insurance.
Executive
Incentive Plan
(“EIP”)
Executive directors are members of the
Executive Incentive Plan. This aims to
reward both in-year performance and
incentivise strategic and innovative
behaviours over the longer-term,
aligned to shareholder objectives,
including customer performance.
Following Health & Safety best
practice, safety is considered to be an
essential part of any role. Therefore,
directors receive no Health & Safety
related incentives.
The EIP works on a balanced scorecard
approach, with measures scored on an
annual basis but set in line with longer
term ambitions, and bonus payouts in
part deferred into subsequent years, to
promote a strategic focus and
sustainable performance.
Pension
Directors are offered the same level of
defined contribution benefits as all
other employees, or a taxable payment
in lieu.
No director is a member of the defined
benefit scheme which is now closed to
new members.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
65
Corporate Governance Report (continued)
Report of the Remuneration Committee
(continued)
CEO pay ratio
In line with statutory requirements, effective for
financial years commencing on or after 1 January
2019, companies with more than 250 employees
and which are quoted on the UK Official List are
required to publish information on their CEO pay
ratio. The requirement is to publish total CEO
remuneration compared to the 25
th
, 50
th
and 75
th
percentile total remuneration of full-time
equivalent UK employees.
There are three methodologies that companies
can choose to report their pay ratio, known as
Option A, B and C. The government preference,
and most accurate reporting method, is Option A.
Electricity North West Limited have elected to
use this method, consistent with previous years,
which enables us to compare total remuneration
for the financial year ended 31 March 2025, in
line with the pay gap requirements.
The following tables set out this information for
total remuneration
1
(which is inclusive of bonus,
long term executive incentive payments,
additional allowances or payments, benefit in
kind and employer pension contributions).
Bonus payments are linked closely to Company
performance and the timing of maturity of long-
term incentive arrangements, so may fluctuate
year on year. We have, therefore, also included a
comparison of total remuneration excluding
bonus and long-term incentive awards.
As per Table 1: The total CEO pay gap has
increased from 2024. The increase is primarily
due to the closure and subsequent payout of the
executive long-term incentive plan, and linked to
that closure, incentive payments accrued this
year and in prior years (that would normally be
payable next year) were paid “in year”.
1
The remuneration of employees who did not receive a full year’s
pay have been excluded to ensure the comparison is fair and
The closure of the executive incentive plan was
linked to the recent company sale process.
Payments and fees received by the CEO from the
NWEN (Jersey) group linked to the sale are not
applicable to this calculation as they are deemed
exceptional in nature.
TABLE 1
25
th
percentile
50
th
percentile
75
th
percentile
2025 Pay
excluding
bonus
1:11
1:8
1:6
2025 Total
remuneration
1:54
1:40
1:30
2024 Pay
excluding
bonus
1:11
1:8
1:6
2024 Total
remuneration
1:22
1:16
1:12
Employee remuneration amounts for each
percentile are shown in Table 2 below.
TABLE 2
25
th
percentile
50
th
percentile
75
th
percentile
2025 Pay
excluding
bonus
£49,070
£66,877
£88,568
2025 Total
remuneration
£50,947
£69,261
£92,694
2024 Pay
excluding
bonus
£44,756
£62,148
£84,529
2024 Total
remuneration
£46,219
£64,113
£87,661
equitable. For example, employees on reduced pay due to statutory
absence those with part year service have been excluded.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
66
Corporate Governance Report (continued)
Report of the Safety, Health and
Environment Committee
The Committee developed the Company’s safety,
health and environment strategies, agreed
targets and monitored Company performance in
these areas. It regularly challenged the executive
and the safety, health and environment team to
look at new initiatives and work with other
organisations.
The Safety, Health and Environment Committee
was terminated by the Board on 23 March 2025
with all of its powers, duties, and obligations
returning to the Board of Directors as necessary.
Membership and meetings
The Committee Chair was Susan Cooklin,
Independent Non-Executive director until she
resigned on 21 March 2025. Composition of the
Committee and attendance by individual
members is detailed on page 54.
Meetings were also attended by executives in
charge of operationally focused directorates.
The role of the Committee
The Committee has delegated authority from the
Board set out in its Terms of Reference.
The primary purpose of the Committee was to:
• Set the corporate safety, health and
environment strategy, objectives, targets
and programmes.
• Monitor performance in these areas with a
view to:
- minimising risk;
- ensuring legal compliance;
- responding to significant events; and
- ensuring significant resources are
allocated for the control of safety,
health and environmental risks.
• Report to the Board developments, trends
and/or forthcoming legislation in relation to
the safety, health and environmental
matters which may be relevant to the
Company’s operations, assets or employees.
• Review the Company’s external reporting in
this area and regulatory disclosures.
At every meeting, the Committee received and
discussed in detail a Safety, Health and
Environment performance report for the
preceding period. Amongst other things, this
report covered case studies, key issues and
developments.
Additionally, the Committee considered relevant
risks (including a review of risk that forms part of
the Board’s overall annual exercise) and oversaw
the Company’s mitigation strategies.
This financial year the Committee focussed on
health and wellbeing activities. It also discussed
the goals of the Environmental Action Plan which
formed part of the previous RIIO-ED2 business
plan. The Fatigue Risk Management Plan was also
discussed for the wellbeing of employees, as was
other safety, health and environment challenges
facing the business.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
67
Directors’ Report
The directors present their Annual Report and Consolidated Financial Statements of Electricity North
West Limited (“the Company”) and its subsidiaries (together referred to as “the Group”) for the year
ended 31 March 2025.
General information
The Company is a private company limited by
shares and incorporated and domiciled in
England, the United Kingdom under the
Companies Act 2006. The principal activity of
the Company is as an electricity distribution
company within the North West Electricity
Networks (Jersey) Limited (“NWEN (Jersey)”)
group, part of the wider group headed by
lberdrola, S.A., one of the largest utility
companies in the world and a leader in
renewable energy.
Information contained in Strategic Report
As permitted by section 414C of the Companies
Act 2006, certain information required to be
included in the Directors’ Report has been
included in the Strategic Report. Specifically,
this relates to:
• risk management, pages 43 to 50;
• how the directors have had regard to the
need to foster business relationships with
stakeholders, page 22;
• employee matters, pages 19 to 20;
• greenhouse gas emissions, pages 14 to 16;
and
• future developments, page 11.
Parent, ultimate parent and controlling party
The immediate parent undertaking is North
West Electricity Networks plc, a company
incorporated and registered in the United
Kingdom.
At 31 March 2024, the ultimate parent
undertaking and ultimate controlling party was
NWEN (Jersey), a company incorporated and
registered in Jersey.
On 22 October 2024, Scottish Power Energy
Networks Holdings Limited (“Scottish Power”),
part of the group headed by Iberdrola, S.A.,
acquired 88% of the shares of NWEN (Jersey),
with the remaining 12% of the shares retained
by KDM Power Limited.
The transaction was subject to review by the
Competition and Markets Authority (“CMA”)
pursuant to the regulations applicable to
mergers of energy network companies in the
United Kingdom; the CMA imposed an Initial
Enforcement Order (“IEO”) preventing any
integration until CMA approval was granted.
CMA approval was granted, and the IEO lifted,
on 20 March 2025.
In the period from 22 October 2024 to 20 March
2025, despite Scottish Power’s 88% equity
ownership of NWEN (Jersey), Scottish Power
did not control NWEN (Jersey), nor therefore
the Company, due to the restrictions in the IEO.
Scottish Power gained control of NWEN (Jersey)
on 20 March 2025, when the CMA approval was
granted and the IEO lifted.
At 31 March 2025, the directors regard
Iberdrola, S.A., a company incorporated and
registered in Spain, as the ultimate parent
undertaking and the ultimate controlling party.
Dividends
Details of the Group’s dividend policy can be
found in the Strategic Report, page 39.
During the year, the Company paid dividends
totalling £45.4m (2024: £30.4m) (Note 30).
The directors do not propose a final dividend for
the year ended 31 March 2025.
Capital structure
The Company’s capital structure is set out in
Note 29.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
68
Directors’ Report (continued)
Financial instruments
The use of financial instruments and their
related risks are disclosed in the Financial
Review and Risk sections of the Strategic Report
on pages 39 and 48, and in Note 21.
Financial risk management
Disclosure around the Group’s principal risks
can be found in the Principal Risks and
Uncertainties section of the Strategic Report on
page 44, and in Note 22.
Employees
The Group’s policies on employee consultation
and involvement, the treatment of disabled
employees and on equality and diversity across
all areas of the business are contained within
the People section of the Strategic Report on
pages 19 to 20.
Greenhouse gas emissions and energy use
Further details on greenhouse gas emissions
are provided in the Business Carbon Footprint
section of the Strategic Report on pages 14 to
16.
Research and development
The Group is committed to developing
innovative and cost-effective solutions for
providing high quality services and reliability to
customers, and for the benefit of the wider
sector and the development of the network, as
further detailed in the Strategic Report. During
the year ended 31 March 2025 the Group
incurred £2.4m of expenditure on research and
development (2024: £1.9m), see Note 5.
Future developments
Details of the future developments of the
Company and Group can be found in the Chief
Executive Officer’s Statement and the Strategic
Report on page 11.
Events after the Balance Sheet date
On 16 June 2025 Scottish Power UK plc
provided North West Electricity Networks
(Jersey) Limited (“NWEN (Jersey)”) with a letter
of support detailing the financial support it has
committed to the group headed by NWEN
(Jersey). An amount of £500.0m is available and
can be utilised by NWEN (Jersey) and any of its
subsidiaries, including the Company. This
commitment will remain in place until the
earlier of the NWEN (Jersey) group securing
alternative financing, or 12 months from the
date of approval of these financial statements,
and will incur a charge of 20 basis points per
annum whilst in place.
Corporate governance
The Group has established a governance
framework for monitoring and overseeing
strategy, conduct of business standards and
operations of the entire business. Details of the
internal control and risk management systems
which govern the Group and Company are
outlined in the Corporate Governance Report
on pages 51 to 66.
Directors’ and officers’ insurance
The NWEN (Jersey) group maintains an
appropriate level of directors’ and officers’
liability insurance, whereby directors and
officers are indemnified against liabilities to the
extent permitted by the Companies Act.
The insurance is a group policy, held in the
name of the ultimate parent, Iberdrola, S.A.,
and is for the benefit of that company and all its
subsidiaries. NWEN (Jersey) and all its
subsidiaries were added to the policy on 22
October 2024, the date Iberdrola, S.A. acquired
its shareholding in NWEN (Jersey). Prior to this
date, NWEN (Jersey) arranged a policy in its
own name which has subsequently been
cancelled.
In addition, on 23 March 2025 the ENW board
by way of written resolution approved the grant
to the directors of a qualifying third-party
indemnity provision.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
69
Directors’ Report (continued)
Directors
The directors of the Company who were in
office during the year were:
Executive Directors
• Chris Johns
• Ian Smyth
Non-executive Directors
• Keith Anderson (appointed 22 March 2025)
• Beatrice Araujo (appointed 22 October
2024, resigned 21 March 2025)
• Anne Baldock (resigned 21 March 2025)
• Alistair Buchanan
• Susan Cooklin (resigned 21 March 2025)
• Rob Holden (resigned 21 March 2025)
• Harold Hutchinson (appointed 22 October
2024)
• Sion Jones (resigned 22 October 2024)
• Charles Langan (appointed 22 March 2025)
• David Mesonero (appointed 22 March 2025)
• Peter O’Flaherty (resigned 22 October 2024)
• Genping Pan (resigned 22 October 2024)
• Mitsuo Wada (resigned 21 March 2025)
• Masahide Yamada
Alternate Directors
• Aisha Hamid (resigned 22 October 2024)
• Michiko Hara (appointed 4 July 2024,
resigned 21 March 2025)
• Makoto Murata
• Tatsuhiro Tamura (resigned 4 July 2024)
• Hailin Yu (resigned 22 October 2024)
Directors served for the whole year, and to the
date of this report, except where otherwise
indicated.
At no time during the year did any director have
a material interest in any contract or
arrangement which was significant in relation
to the Group’s business.
Independent auditor
PricewaterhouseCoopers LLP, Statutory
Auditor, Manchester, United Kingdom is acting
as independent auditor for the current year, but
will then step down. KPMG LLP, the
independent auditor of Iberdrola, S.A. and its
subsidiaries, will be proposed for appointment
as the statutory auditor of the Group and
Company.
Statement by the directors in performance of
their statutory duties in accordance with
s172(1) Companies Act 2006
The Board of Directors of the Company
consider, both individually and together, that
they have acted in a way they consider to be in
good faith and would be most likely to promote
the success of the Company for the benefit of
its members as a whole (having regard to the
stakeholders and matters set out in s172(1)(a-f)
of the Companies Act 2006) in decisions taken
during the year ended 31 March 2025. More
details can be found on page 28 of the Strategic
Report.
Registered address
The Company is registered in England, the
United Kingdom, at the following address:
Electricity North West Limited
Borron Street
Stockport
England
SK1 2JD
Registered number: 02366949
Approved by the Board on 16 June 2025 and
signed on its behalf by:
Chris Johns
Director
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
70
Directors’ Responsibilities Statement
The directors are responsible for preparing the
Annual Report and Consolidated Financial
Statements and the financial statements in
accordance with applicable law and regulation.
Company law requires the directors to prepare
financial statements for each financial year.
Under that law the directors have prepared the
group and the company financial statements in
accordance with UK-adopted international
accounting standards.
Under company law, directors must not
approve the financial statements unless they
are satisfied that they give a true and fair view
of the state of affairs of the group and company
and of the profit or loss of the group and
company for that period. In preparing the
financial statements, the directors are required
to:
• select suitable accounting policies and then
apply them consistently;
• state whether applicable UK-adopted
international accounting standards have
been followed, subject to any material
departures disclosed and explained in the
financial statements;
• make judgements and accounting estimates
that are reasonable and prudent; and
• prepare the financial statements on the
going concern basis unless it is inappropriate
to presume that the group and company will
continue in business.
The directors are responsible for safeguarding
the assets of the group and company and hence
for taking reasonable steps for the prevention
and detection of fraud and other irregularities.
The directors are also responsible for keeping
adequate accounting records that are sufficient
to show and explain the group’s and company’s
transactions and disclose with reasonable
accuracy at any time the financial position of
the group and company and enable them to
ensure that the financial statements comply
with the Companies Act 2006.
The directors are responsible for the
maintenance and integrity of the company’s
website. Legislation in the United Kingdom
governing the preparation and dissemination of
financial statements may differ from legislation
in other jurisdictions.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
71
Directors’ Responsibilities Statement
(continued)
Directors’ confirmations
The directors consider that the Annual Report
and Consolidated Financial Statements and
accounts, taken as a whole, is fair, balanced and
understandable and provides the information
necessary for shareholders to assess the
group’s and company’s position and
performance, business model and strategy.
Each of the directors, whose names and
functions are listed in Directors' Report confirm
that, to the best of their knowledge:
• the group and company financial
statements, which have been prepared in
accordance with UK-adopted international
accounting standards and IFRSs issued by
IASB, give a true and fair view of the assets,
liabilities, financial position and profit of the
group and profit of the company; and
• the Strategic Report includes a fair review of
the development and performance of the
business and the position of the group and
company, together with a description of the
principal risks and uncertainties that it faces.
In the case of each director in office at the date
the directors’ report is approved:
• so far as the director is aware, there is no
relevant audit information of which the
group’s and company’s auditors are
unaware; and
• they have taken all the steps that they ought
to have taken as a director in order to make
themselves aware of any relevant audit
information and to establish that the group’s
and company’s auditors are aware of that
information.
Approved by the Board of Directors on 16 June
2025 and is signed on its behalf by:
Chris Johns
Director
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
72
Independent auditors’ report to the
members of Electricity North West
Limited
Report on the audit of the financial statements
Opinion
In our opinion, Electricity North West Limited’s Group financial statements and Company financial
statements (the “financial statements”):
• give a true and fair view of the state of the Group’s and of the Company’s affairs as at
31 March 2025 and of the Group’s and Company’s profit and the Group’s and Company’s cash
flows for the year then ended;
• have been properly prepared in accordance with UK-adopted international accounting standards;
and
• have been prepared in accordance with the requirements of the Companies Act 2006.
We have audited the financial statements, included within the Annual Report and Consolidated
Financial Statements (the “Annual Report”), which comprise: the Consolidated and Company
Statements of Financial Position as at 31 March 2025; the Consolidated and Company Statements of
Profit or Loss and Other Comprehensive Income, the Consolidated Statement of Changes in Equity,
the Company Statement of Changes in Equity, and the Consolidated and Company Statements of Cash
Flows for the year then ended; and the notes to the financial statements, comprising material
accounting policy information and other explanatory information.
Our opinion is consistent with our reporting to the Audit and Compliance Committee.
Basis for opinion
We conducted our audit in accordance with International Standards on Auditing (UK) (“ISAs (UK)”) and
applicable law. Our responsibilities under ISAs (UK) are further described in the Auditors’
responsibilities for the audit of the financial statements section of our report. We believe that the
audit evidence we have obtained is sufficient and appropriate to provide a basis for our opinion.
Independence
We remained independent of the Group in accordance with the ethical requirements that are relevant
to our audit of the financial statements in the UK, which includes the FRC’s Ethical Standard, as
applicable to listed public interest entities, and we have fulfilled our other ethical responsibilities in
accordance with these requirements.
To the best of our knowledge and belief, we declare that non-audit services prohibited by the FRC’s
Ethical Standard were not provided.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
73
Independent Auditor’s Report to the Members of Electricity North
West Limited (continued)
Other than those disclosed in Note 5 - Operating Profit, in the Notes to the Financial Statements, we
have provided no non-audit services to the Company or its controlled undertakings in the period under
audit.
Our audit approach
Overview
Audit scope
• The Group is organised into three components, located in the UK. The Group financial statements
are a consolidation of these components and the consolidation journals.
• Of the 3 components, we have identified one component which we considered to be significant
based on size and therefore required an audit of its complete financial information, this component
is Electricity North West Limited. We also audited material consolidation journals.
• Electricity North West Limited contributed 100 per cent of the Group's consolidated revenue.
• The remaining two components are considered to be inconsequential components, as such we
performed no additional audit procedures over these entities.
Key audit matters
• Valuation of Derivative Financial Instruments (Group and Company)
• Capitalisation of Costs (Group and Company)
• Valuation of Defined Benefit Pension Obligations (Group and Company)
Materiality
• Overall Group materiality: £7,300,000 (2024: £5,700,000) based on 5% of three years average of
profit before tax, derivative fair value movements and accretion charges.
• Overall Company materiality: £7,300,000 (2024: £5,700,000) based on 5% of three years average
of profit before tax, derivative fair value movements and accretion charges.
• Performance materiality: £5,500,000 (2024: £4,275,000) (Group) and £5,500,000 (2024:
£4,275,000) (Company).
The scope of our audit
As part of designing our audit, we determined materiality and assessed the risks of material
misstatement in the financial statements.
Key audit matters
Key audit matters are those matters that, in the auditors’ professional judgement, were of most
significance in the audit of the financial statements of the current period and include the most
significant assessed risks of material misstatement (whether or not due to fraud) identified by the
auditors, including those which had the greatest effect on: the overall audit strategy; the allocation of
resources in the audit; and directing the efforts of the engagement team. These matters, and any
comments we make on the results of our procedures thereon, were addressed in the context of our
audit of the financial statements as a whole, and in forming our opinion thereon, and we do not
provide a separate opinion on these matters.
This is not a complete list of all risks identified by our audit.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
74
Independent Auditor’s Report to the Members of Electricity North
West Limited (continued)
Material uncertainty related to going concern and the valuation of defined benefit pension assets,
which were key audit matters last year, are no longer included because of the conclusion of the
Strategic Review undertaken by the shareholders of the Company's former ultimate parent
undertaking, North West Electricity Networks (Jersey) Limited ("NWEN (Jersey)"), which resulted in
the sale of 88% of the shares of NWEN (Jersey) to the Group headed by Iberdrola SA. As a result, the
conditions giving rise to a material uncertainty related to going concern in the prior year are no longer
present. In addition, the valuation of defined benefit pension assets is no longer considered to be a
key audit matter because of a reduction in our assessed level of audit risk associated with this area.
Otherwise, the key audit matters below are consistent with last year.
Key audit matter
How our audit addressed the key
audit matter
Valuation of Derivative Financial Instruments (Group and Company)
Refer to Note 20 in the Group and Company financial statements.
The Group and Company hold derivative financial instruments with
both external and sister Company counterparties.
At 31 March 2025 instruments held with external parties comprised
derivative liabilities of £326.1m and derivative assets of £43.8m,
whilst those held with sister companies comprised derivative
liabilities and assets of £192.2m each.
These instruments are measured at fair value through profit and loss.
The valuations are complex, and made up of underlying risk free
valuations, overlaid with credit risk adjustments (the 'risk
adjustments'). We consider there to be a heightened risk of valuation
error with respect to the risk adjustments due to fewer observable
inputs and a higher level of estimation uncertainty.
The risk adjustment have the effect of reducing the overall value of
the derivative liabilities by £64.0m.
To assess the appropriateness of the valuation
of derivative financial instruments, we
performed the following:
> We assessed the reasonableness of the risk
adjustments using independently sourced data
points and models;
> We understood the underlying control
environment applied to the valuation of the
instruments;
> We tested the models and key assumptions
used by management to value derivatives;
> We assessed the adequacy of the disclosures
within the financial statements, including the
disclosure requirements related to the Level 3
inputs used for valuing the credit risk
adjustment; and
> We prepared independent valuations for
derivatives within the portfolio as at 31 March
2025 on a pre and post credit risk basis,
including independently calculating individual
credit risk adjustments.
We concluded that valuations of derivatives,
including the determination of credit risk
adjustments within the valuations, were in line
with ranges and thresholds we independently
determined using independently sourced data
points.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
75
Independent Auditor’s Report to the Members of Electricity North
West Limited (continued)
Capitalisation of Costs (Group and Company)
Refer to Notes 3 and 11 in the Group and Company financial
statements.
The Group continues to make significant capital investment in
Property, plant and equipment, principally in relation to the
development of the distribution network. For the year ended 31
March 2025 capital additions totalled £361.8m.
These additions include £152.5m of capitalised overhead costs,
of which £105.7m relates to capitalised employee costs. Certain
categories of overhead costs are capitalised based on
judgemental percentage rates.
This year, our testing has focused on partly capitalised areas
where the capitalisation rate has changed the most from prior
year, whether increasing or decreasing. This is where we believe
the significant risk resides.
The risk is that the capitalisation rates used do not appropriately
reflect the nature of activities to which the underlying costs relate,
resulting in an incorrect apportionment of overhead costs
between Property, plant and equipment on the Consolidated and
Company Statements of Financial Position and expenses
recognised in the Consolidated and Company Statements of
Profit or Loss and Other Comprehensive Income.
To assess the appropriateness of and nature of costs
capitalised into Property, plant and equipment in the
year, we conducted the following procedures:
> We discussed with management to understand the
process by which capitalisation rates are determined
and how costs are then appropriately accounted for
when incurred;
> We understood how activities by cost centre are
used to determine the percentage of costs
capitalised;
> We sampled a selection of the cost categories, with
a focus on the cost centres that have experienced
the most movement in capitalisation rate since FY24;
> We compared rates to historical trends and industry
peers for reasonableness. We have considered the
overall trend in the level of costs capitalised, taking
into account relevant developments impacting the
Company and Group, for example the increased
network investment required to meet net-zero
commitments;
> We verified the accuracy of the disclosures
included within the financial statements, as well as
performing testing over the sensitivity disclosures;
> We performed procedures to confirm that costs are
appropriately allocated to the cost centre or centres
to which they relate; and
> We have selected cost centres for testing based on
the risk assessment set and undertook procedures to
corroborate the nature of activities performed under
each cost category to assess the appropriateness of
the capitalisation rates applied.
We have concluded that management has applied
appropriate estimates to determine the overall level
of costs to be capitalised for the year, including in
relation to those costs capitalised based on a
judgemental proportion of costs, where we
considered there to be a heightened level of audit
risk.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
76
Independent Auditor’s Report to the Members of Electricity North
West Limited (continued)
Valuation of Defined Benefit Pension Obligations (Group
and Company)
Refer to Note 23 in the Group and Company financial
statements. The net defined benefit pension surplus at
31 March 2025 was £56.1m, comprising gross assets of
£825.2m and gross liabilities of £769.1m.
The determination of the value of liabilities requires the
application of an actuarial valuation method, the
attribution of benefits to periods of service, and the use
of significant actuarial assumptions including in
particular the discount rate, inflation rates and the
average life expectancy of members.
To assess the appropriateness of the values of obligations in
the defined benefit pension scheme, we performed the
following:
> We assessed the reasonableness of membership data
used in valuing the defined benefit pension obligation;
> In regard to active members, we have utilised testing from
prior period given the triennial valuation data is rolled
forward;
> We reviewed the competency, independence, objectivity
and capability of management’s expert used in setting the
liability assumptions; and
> We considered the adequacy of the Group's disclosures in
respect of reporting the key assumptions and sensitivities of
assumptions.
Based on the results of our testing, we found the liability
assumptions made in the valuation of the UK defined benefit
pension scheme resulted in an overall acceptable valuation,
taking into account the materiality level applied. We also
consider the disclosures made in the financial statements to
be appropriate.
How we tailored the audit scope
We tailored the scope of our audit to ensure that we performed enough work to be able to give an
opinion on the financial statements as a whole, taking into account the structure of the Group and the
Company, the accounting processes and controls, and the industry in which they operate.
The Group owns and operates the North West electricity distribution network, meaning that it is a
Distribution Network Operator. There is one cash generating unit within the Group.
The Group is organised into three components, located in the UK, being the Company, and two
dormant subsidiary companies (Electricity North West Number 1 Company Limited and ENW (ESPS)
Pensions Trustees Limited). The Group financial statements are a combination of these components
and consolidation journals.
Of the three components, we have identified one component, Electricity North West Limited, which
we considered to be significant based on size and therefore required an audit of its complete financial
information. We also audited material consolidation journals.
Electricity North West Limited contributed 100 per cent of the Group's consolidated revenue.
All audit work on the Group and the Company was performed by the Group engagement team.
The remaining two components are considered to be inconsequential components.
The impact of climate risk on our audit
As part of our audit we made enquiries of management to understand the process management
adopted to assess the extent of the potential impact of climate risk on the Group’s financial
statements and support the disclosures made within the Annual Report.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
77
Independent Auditor’s Report to the Members of Electricity North
West Limited (continued)
We used our knowledge of the Group, to challenge the completeness of management’s climate risk
assessment by challenging the consistency of management’s climate impact assessment with internal
climate plans and board minutes, including whether the time horizons management have used take
account of all relevant aspects of climate change such as transition risks and reading the entity’s
website and communications for details of climate related impacts.
Using our knowledge of the business we evaluated management’s risk assessment, its estimates as
set out in Note 3 of the financial statements and resulting disclosures, where significant. We
considered the only financial statement areas to be potentially materially impacted by climate risk to
be the directors' impairment assessment and capitalisation of costs. We tailored our audit approach
to respond to the audit risk identified in these areas. In particular, we challenged management on how
carbon reduction commitments have impacted the assumptions within the discounted cash flows
prepared by management that are used in the Group's impairment analysis, and the level of costs
capitalised into Property, Plant and Equipment.
We also considered the consistency of the disclosures in relation to climate change within the Annual
Report with the financial statements and our knowledge obtained from our audit.
Our procedures did not identify any other material impacts in the context of our audit of the financial
statements as a whole, or our key audit matters for the year ended 31 March 2025.
Materiality
The scope of our audit was influenced by our application of materiality. We set certain quantitative
thresholds for materiality. These, together with qualitative considerations, helped us to determine the
scope of our audit and the nature, timing and extent of our audit procedures on the individual financial
statement line items and disclosures and in evaluating the effect of misstatements, both individually
and in aggregate on the financial statements as a whole.
Based on our professional judgement, we determined materiality for the financial statements as a
whole as follows:
Financial statements - Group
Financial statements - Company
Overall
materiality
£7,300,000 (2024: £5,700,000).
£7,300,000 (2024: £5,700,000).
How we
determined
it
5% of three years average of profit before tax,
derivative fair value movements and accretion
charges
5% of three years average of profit before tax,
derivative fair value movements and accretion
charges
Rationale for
benchmark
applied
Profit before tax and fair value movements is a
primary measure reported to shareholders to
indicate the underlying performance of the Group
and Company. We have also excluded the
impact of accretion charges, as we do not
consider these to relate directly to the underlying
operations and performance of the Group and
Company. The use of a three year average is
considered appropriate as this reduces volatility
caused by under or over recoveries of electricity
distribution revenue in a specific financial year.
Profit before tax and fair value movements is a
primary measure reported to shareholders to
indicate the underlying performance of the
Company. We have also excluded the impact of
accretion charges, as we do not consider these
to relate directly to the underlying operations and
performance of the Company. The use of a three
year average is considered appropriate as this
reduces volatility caused by under or over
recoveries of electricity distribution revenue in a
specific financial year.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
78
Independent Auditor’s Report to the Members of Electricity North
West Limited (continued)
For each component in the scope of our Group audit, we allocated a materiality that is less than our
overall Group materiality. The range of materiality allocated across components was £6,090,000,
being the component materiality level applied to the sole audit of the financial information of the
component, Electricity North West Limited.
We use performance materiality to reduce to an appropriately low level the probability that the
aggregate of uncorrected and undetected misstatements exceeds overall materiality. Specifically, we
use performance materiality in determining the scope of our audit and the nature and extent of our
testing of account balances, classes of transactions and disclosures, for example in determining
sample sizes. Our performance materiality was 75% (2024: 75%) of overall materiality, amounting to
£5,500,000 (2024: £4,275,000) for the Group financial statements and £5,500,000 (2024: £4,275,000)
for the Company financial statements.
In determining the performance materiality, we considered a number of factors - the history of
misstatements, risk assessment and aggregation risk and the effectiveness of controls - and concluded
that an amount at the upper end of our normal range was appropriate.
We agreed with the Audit and Compliance Committee that we would report to them misstatements
identified during our audit above £0.32m (Group audit) (2024: £0.28m) and £0.32m (Company audit)
(2024: £0.28m) as well as misstatements below those amounts that, in our view, warranted reporting
for qualitative reasons.
Conclusions relating to going concern
Our evaluation of the directors’ assessment of the Group's and the Company’s ability to continue to
adopt the going concern basis of accounting included:
• Evaluating management's forecast base case and downside scenarios and challenging the
appropriateness of underlying assumptions;
• Reviewing management accounts for the financial period to date and comparing those with
management's scenarios;
• Evaluating the historical accuracy of management forecasts;
• Testing the mathematical integrity of management's going concern forecast models;
• Reviewing the disclosures made in respect of going concern included in the financial statements;
• Reviewing the letter of support provided by Scottish Power UK plc and assessing the Directors'
evaluation of Scottish Power UK plc's ability to provide financial support up to the level required
under all forecast scenarios; and
• Assessing whether the Company has sufficient liquidity to act as a guarantor of related parties and
challenging the available support by applying severe but plausible sensitivities.
Based on the work we have performed, we have not identified any material uncertainties relating to
events or conditions that, individually or collectively, may cast significant doubt on the Group's and
the Company’s ability to continue as a going concern for a period of at least twelve months from when
the financial statements are authorised for issue.
In auditing the financial statements, we have concluded that the directors’ use of the going concern
basis of accounting in the preparation of the financial statements is appropriate.
However, because not all future events or conditions can be predicted, this conclusion is not a
guarantee as to the Group's and the Company's ability to continue as a going concern.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
79
Independent Auditor’s Report to the Members of Electricity North
West Limited (continued)
In relation to the directors’ reporting on how they have applied the UK Corporate Governance Code,
we have nothing material to add or draw attention to in relation to the directors’ statement in the
financial statements about whether the directors considered it appropriate to adopt the going concern
basis of accounting.
Our responsibilities and the responsibilities of the directors with respect to going concern are
described in the relevant sections of this report.
Reporting on other information
The other information comprises all of the information in the Annual Report other than the financial
statements and our auditors’ report thereon. The directors are responsible for the other information.
Our opinion on the financial statements does not cover the other information and, accordingly, we do
not express an audit opinion or, except to the extent otherwise explicitly stated in this report, any
form of assurance thereon.
In connection with our audit of the financial statements, our responsibility is to read the other
information and, in doing so, consider whether the other information is materially inconsistent with
the financial statements or our knowledge obtained in the audit, or otherwise appears to be materially
misstated. If we identify an apparent material inconsistency or material misstatement, we are
required to perform procedures to conclude whether there is a material misstatement of the financial
statements or a material misstatement of the other information. If, based on the work we have
performed, we conclude that there is a material misstatement of this other information, we are
required to report that fact. We have nothing to report based on these responsibilities.
With respect to the Strategic report and Directors' Report, we also considered whether the disclosures
required by the UK Companies Act 2006 have been included.
Based on our work undertaken in the course of the audit, the Companies Act 2006 requires us also to
report certain opinions and matters as described below.
Strategic report and Directors' Report
In our opinion, based on the work undertaken in the course of the audit, the information given in the
Strategic report and Directors' Report for the year ended 31 March 2025 is consistent with the
financial statements and has been prepared in accordance with applicable legal requirements.
In light of the knowledge and understanding of the Group and Company and their environment
obtained in the course of the audit, we did not identify any material misstatements in the Strategic
report and Directors' Report.
Corporate governance statement
ISAs (UK) require us to review the directors’ statements in relation to going concern, longer-term
viability and that part of the corporate governance statement relating to the Company’s compliance
with the provisions of the UK Corporate Governance Code, which the Listing Rules of the Financial
Conduct Authority specify for review by the auditor. Our additional responsibilities with respect to the
corporate governance statement as other information are described in the Reporting on other
information section of this report.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
80
Independent Auditor’s Report to the Members of Electricity North
West Limited (continued)
Based on the work undertaken as part of our audit, we have concluded that each of the following
elements of the corporate governance statement, included within the Strategic Report, Directors'
Report and Corporate Governance Report is materially consistent with the financial statements and
our knowledge obtained during the audit, and we have nothing material to add or draw attention to
in relation to:
• The directors’ confirmation that they have carried out a robust assessment of the emerging and
principal risks;
• The disclosures in the Annual Report that describe those principal risks, what procedures are in
place to identify emerging risks and an explanation of how these are being managed or mitigated;
• The directors’ statement in the financial statements about whether they considered it appropriate
to adopt the going concern basis of accounting in preparing them, and their identification of any
material uncertainties to the Group’s and Company’s ability to continue to do so over a period of
at least twelve months from the date of approval of the financial statements;
• The directors’ explanation as to their assessment of the Group's and Company’s prospects, the
period this assessment covers and why the period is appropriate; and
• The directors’ statement as to whether they have a reasonable expectation that the Company will
be able to continue in operation and meet its liabilities as they fall due over the period of its
assessment, including any related disclosures drawing attention to any necessary qualifications or
assumptions.
Our review of the directors’ statement regarding the longer-term viability of the Group and Company
was substantially less in scope than an audit and only consisted of making inquiries and considering
the directors’ process supporting their statement; checking that the statement is in alignment with
the relevant provisions of the UK Corporate Governance Code; and considering whether the statement
is consistent with the financial statements and our knowledge and understanding of the Group and
Company and their environment obtained in the course of the audit.
In addition, based on the work undertaken as part of our audit, we have concluded that each of the
following elements of the corporate governance statement is materially consistent with the financial
statements and our knowledge obtained during the audit:
• The directors’ statement that they consider the Annual Report, taken as a whole, is fair, balanced
and understandable, and provides the information necessary for the members to assess the
Group’s and Company's position, performance, business model and strategy;
• The section of the Annual Report that describes the review of effectiveness of risk management
and internal control systems; and
• The section of the Annual Report describing the work of the Audit and Compliance Committee.
We have nothing to report in respect of our responsibility to report when the directors’ statement
relating to the Company’s compliance with the Code does not properly disclose a departure from a
relevant provision of the Code specified under the Listing Rules for review by the auditors.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
81
Independent Auditor’s Report to the Members of Electricity North
West Limited (continued)
Responsibilities for the financial statements and the audit
Responsibilities of the directors for the financial statements
As explained more fully in the Directors' Responsibilities Statement, the directors are responsible for
the preparation of the financial statements in accordance with the applicable framework and for being
satisfied that they give a true and fair view. The directors are also responsible for such internal control
as they determine is necessary to enable the preparation of financial statements that are free from
material misstatement, whether due to fraud or error.
In preparing the financial statements, the directors are responsible for assessing the Group’s and the
Company’s ability to continue as a going concern, disclosing, as applicable, matters related to going
concern and using the going concern basis of accounting unless the directors either intend to liquidate
the Group or the Company or to cease operations, or have no realistic alternative but to do so.
Auditors’ responsibilities for the audit of the financial statements
Our objectives are to obtain reasonable assurance about whether the financial statements as a whole
are free from material misstatement, whether due to fraud or error, and to issue an auditors’ report
that includes our opinion. Reasonable assurance is a high level of assurance, but is not a guarantee
that an audit conducted in accordance with ISAs (UK) will always detect a material misstatement when
it exists. Misstatements can arise from fraud or error and are considered material if, individually or in
the aggregate, they could reasonably be expected to influence the economic decisions of users taken
on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations. We design
procedures in line with our responsibilities, outlined above, to detect material misstatements in
respect of irregularities, including fraud. The extent to which our procedures are capable of detecting
irregularities, including fraud, is detailed below.
Based on our understanding of the Group and industry, we identified that the principal risks of non-
compliance with laws and regulations related to Health and Safety regulation and regulations
applicable to the operation of electricity distribution networks in the UK, and we considered the extent
to which non-compliance might have a material effect on the financial statements. We also considered
those laws and regulations that have a direct impact on the financial statements such as the
Companies Act 2006 and applicable tax laws. We evaluated management’s incentives and
opportunities for fraudulent manipulation of the financial statements (including the risk of override
of controls), and determined that the principal risks were related to inappropriate journal entries to
improve financial performance, and management bias within accounting estimates and judgements.
Audit procedures performed by the engagement team included:
• challenging assumptions and judgements made by management in their significant accounting
estimates;
• discussions with the Audit and Compliance Committee, management and internal audit including
consideration of known or suspected instances of non-compliance with laws and regulation or
fraud;
• reviewing minutes of meetings of those charged with governance;
• auditing the calculations supporting tax balances and disclosures;
• identifying and testing journal entries, in particular any journal entries posted with unusual account
combinations; and
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
82
Independent Auditor’s Report to the Members of Electricity North
West Limited (continued)
• reviewing financial statements disclosures and testing to supporting documentation, where
appropriate, to assess compliance with applicable laws and regulations.
There are inherent limitations in the audit procedures described above. We are less likely to become
aware of instances of non-compliance with laws and regulations that are not closely related to events
and transactions reflected in the financial statements. Also, the risk of not detecting a material
misstatement due to fraud is higher than the risk of not detecting one resulting from error, as fraud
may involve deliberate concealment by, for example, forgery or intentional misrepresentations, or
through collusion.
Our audit testing might include testing complete populations of certain transactions and balances,
possibly using data auditing techniques. However, it typically involves selecting a limited number of
items for testing, rather than testing complete populations. We will often seek to target particular
items for testing based on their size or risk characteristics. In other cases, we will use audit sampling
to enable us to draw a conclusion about the population from which the sample is selected.
A further description of our responsibilities for the audit of the financial statements is located on the
FRC’s website at: www.frc.org.uk/auditorsresponsibilities. This description forms part of our auditors’
report.
Use of this report
This report, including the opinions, has been prepared for and only for the Company’s members as a
body in accordance with Chapter 3 of Part 16 of the Companies Act 2006 and for no other purpose.
We do not, in giving these opinions, accept or assume responsibility for any other purpose or to any
other person to whom this report is shown or into whose hands it may come save where expressly
agreed by our prior consent in writing.
Other required reporting
Companies Act 2006 exception reporting
Under the Companies Act 2006 we are required to report to you if, in our opinion:
• we have not obtained all the information and explanations we require for our audit; or
• adequate accounting records have not been kept by the Company, or returns adequate for our
audit have not been received from branches not visited by us; or
• certain disclosures of directors’ remuneration specified by law are not made; or
• the Company financial statements are not in agreement with the accounting records and returns.
We have no exceptions to report arising from this responsibility.
Appointment
Following the recommendation of the Audit and Compliance Committee, we were appointed by the
members on 16 September 2022 to audit the financial statements for the year ended 31 March 2023
and subsequent financial periods. The period of total uninterrupted engagement is 3 years, covering
the years ended 31 March 2023 to 31 March 2025.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
83
Independent Auditor’s Report to the Members of Electricity North
West Limited (continued)
Other matter
The Company is required by the Financial Conduct Authority Disclosure Guidance and Transparency
Rules to include these financial statements in an annual financial report prepared under the structured
digital format required by DTR 4.1.15R - 4.1.18R and filed on the National Storage Mechanism of the
Financial Conduct Authority. This auditors’ report provides no assurance over whether the structured
digital format annual financial report has been prepared in accordance with those requirements.
Simon White (Senior Statutory Auditor)
for and on behalf of PricewaterhouseCoopers LLP
Chartered Accountants and Statutory Auditors
Manchester
16 June 2025
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
84
Financial Statements
Consolidated and Company Statements of Profit or Loss and Other Comprehensive
Income
For the year ended 31 March 2025
Group and
Group and
Company
Company
2025
2024
Note
£m
£m
Revenue
4
654.4
598.1
Employee costs
5,6
(80.0)
(76.7)
Depreciation and amortisation expense
5
(157.0)
(146.7)
Other operating costs
(136.6)
(145.6)
Total operating costs
(373.6)
(369.0)
Operating profit
5
280.8
229.1
Finance income
8
6.7
21.0
Finance costs
9
(39.1)
(88.3)
Profit before income tax
248.4
161.8
Income tax expense
10
(61.9)
(41.7)
Profit for the financial year
28
186.5
120.1
Other comprehensive income/(expense):
Items that will not be reclassified to profit or loss:
Remeasurement of retirement benefit scheme
23
14.1
(6.8)
Deferred tax on remeasurement of retirement benefit scheme
25
(3.5)
1.7
Other comprehensive income/(expense) for the financial year
28
10.6
(5.1)
Total comprehensive income for the financial year
197.1
115.0
The results for the current and prior year are derived from continuing operations.
The above consolidated and company statements of profit or loss and other comprehensive income
should be read in conjunction with the notes which form part of these financial statements.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
85
Consolidated and Company Statements of Financial Position
As at 31 March 2025
Group
Company
Group
Company
2025
2025
2024
2024
Note
£m
£m
£m
£m
ASSETS
Non-current assets
Property, plant and equipment
11
4,004.8
4,004.8
3,785.8
3,785.8
Intangible assets and goodwill
13
53.1
53.1
52.1
52.1
Investment in subsidiaries
14
-
15.4
-
15.4
Derivative assets
20
236.0
236.0
245.6
245.6
Retirement benefit surplus
23
56.1
56.1
39.0
39.0
Total non-current assets
4,350.0
4,365.4
4,122.5
4,137.9
Current assets
Inventories
15
56.7
56.7
49.3
49.3
Trade and other receivables
16
100.9
100.9
102.5
102.5
Cash and cash equivalents
17
132.1
132.1
189.8
189.8
Total current assets
289.7
289.7
341.6
341.6
Total assets
4,639.7
4,655.1
4,464.1
4,479.5
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
86
Consolidated and Company Statements of Financial Position (continued)
As at 31 March 2025
Group
Company
Group
Company
2025
2025
2024
2024
Note
£m
£m
£m
£m
LIABILITIES
Current liabilities
Trade and other payables
18
(187.3)
(203.0)
(163.5)
(179.2)
Current income tax liability
(8.7)
(8.7)
(18.5)
(18.5)
Borrowings
19
(467.8)
(467.8)
(10.9)
(10.9)
Customer contributions
24
(67.1)
(67.1)
(81.0)
(81.0)
Provisions
26
(2.5)
(2.5)
(0.5)
(0.5)
Total current liabilities
(733.4)
(749.1)
(274.4)
(290.1)
Non-current liabilities
Borrowings
19
(1,098.0)
(1,098.0)
(1,559.1)
(1,559.1)
Derivative liabilities
20
(518.3)
(518.3)
(569.5)
(569.5)
Customer contributions
24
(749.9)
(749.9)
(720.3)
(720.3)
Deferred tax
25
(308.9)
(308.9)
(262.2)
(262.2)
Provisions
26
(1.1)
(1.1)
(0.2)
(0.2)
Total non-current liabilities
(2,676.2)
(2,676.2)
(3,111.3)
(3,111.3)
Total liabilities
(3,409. 6)
(3,425.3)
(3,385.7)
(3,401.4)
Net assets
1,230.1
1,229.8
1,078.4
1,078.1
EQUITY
Share capital
27,28
238.4
238.4
238.4
238.4
Share premium account
28
4.4
4.4
4.4
4.4
Revaluation reserve
28
68.0
68.0
70.0
70.0
Capital redemption reserve
28
8.6
8.6
8.6
8.6
Retained earnings
28
910.7
910.4
757.0
756.7
Total equity
28
1,230.1
1,229.8
1,078.4
1,078.1
The above consolidated and company statements of financial position should be read in conjunction
with the notes which form part of these financial statements.
The financial statements were approved and authorised for issue by the Board of directors on 16 June
2025 and were signed on its behalf by:
Chris Johns
Director
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
87
Consolidated Statement of Changes in Equity
For the year ended 31 March 2025
Share capital
(Note
27)
Share premium
account
Revaluation reserve
Capital redemption
reserve
Retained earnings
Total
equity
£m
£m
£m
£m
£m
£m
At 1 April 2023
238.4
4.4
72.0
8.6
670.4
993.8
Profit for the financial year
-
-
-
-
120.1
120.1
Other comprehensive expense for the financial
-
-
-
-
(5.1)
(5.1)
year
Transfer from revaluation reserve
-
-
(2.0)
-
2.0
-
Total comprehensive income for the financial
-
-
(2.0)
-
117.0
115.0
year
Dividends (Note 30 & 32)
-
-
-
-
(30.4)
(30.4)
At 31 March 2024 and 1 April 2024
238.4
4.4
70.0
8.6
757.0
1,078.4
Profit for the financial year
-
-
-
-
186.5
186.5
Other comprehensive income for the financial
year
-
-
-
-
10.6
10.6
Transfer from revaluation reserve
-
-
(2.0)
-
2.0
-
Total comprehensive income for the financial
year
-
-
(2.0)
-
199.1
197.1
Dividends (Note 30 & 32)
-
-
-
-
(45.4)
(45.4)
At 31 March 2025
238.4
4.4
68.0
8.6
910.7
1,230.1
The above consolidated statement of changes in equity should be read in conjunction with the notes
which form part of these financial statements.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
88
Company Statement of Changes in Equity
For the year ended 31 March 2025
Share capital
(Note
27)
Share
premium
account
Revaluation reserve
Capital redemption
reserve
Retained earnings
Total
equity
£m
£m
£m
£m
£m
£m
At 1 April 2023
238.4
4.4
72.0
8.6
670.1
993.5
Profit for the financial year
-
-
-
-
120.1
120.1
Other comprehensive expense for the financial
year
-
-
-
-
(5.1)
(5.1)
Transfer from revaluation reserve
-
-
(2.0)
-
2.0
-
Total comprehensive income for the financial
year
-
-
(2.0)
-
117.0
115.0
Dividends (Note 30 & 32)
-
-
-
-
(30.4)
(30.4)
At 31 March 2024 and 1 April 2024
238.4
4.4
70.0
8.6
756.7
1,078.1
Profit for the financial year
-
-
-
-
186.5
186.5
Other comprehensive income for the financial
year
-
-
-
-
10.6
10.6
Transfer from revaluation reserve
-
-
(2.0)
-
2.0
-
Total comprehensive income for the financial
year
-
-
(2.0)
-
199.1
197.1
Dividends (Note 30 & 32)
-
-
-
-
(45.4)
(45.4)
At 31 March 2025
238.4
4.4
68.0
8.6
910.4
1,229.8
The above company statement of changes in equity should be read in conjunction with the notes
which form part of these financial statements.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
89
Consolidated and Company Statements of Cash Flows
For the year ended 31 March 2025
Group and
Group and
Company
Company
2025
2024
Note
£m
£m
Operating activities
Cash generated from operations
34
412.2
311.3
Customer contributions received
24
37.5
57.1
Interest paid
(79.8)
(75.4)
Interest portion of lease liabilities
19
(0.3)
(0.3)
Accretion on index-linked swaps
9
-
(87.0)
Income taxes (paid)/received
(28.6)
6.2
Net cash generated from operating activities
341.0
211.9
Investing activities
Interest received and similar income
6.9
22.6
Transfer from money market deposits over three months
-
305.7
Purchase of property, plant and equipment
(355.4)
(273.5)
Purchase of intangible assets
13
(15.2)
(11.1)
Proceeds from sale of property, plant and equipment
0.5
0.2
Net cash (used in)/generated from investing activities
(363.2)
43.9
Net cash flow before financing activities
(22.2)
255.8
Financing activities
Repayment of external borrowings
19
(9.3)
(232.9)
Repayment of lease liabilities
19
(1.9)
(1.8)
Increase in loan from parent
19
1.3
13.3
Movement on cash collateral held
19.8
12.0
Dividends paid
30,32
(45.4)
(30.4)
Net cash used in financing activities
(35.5)
(239.8)
Net (decrease)/increase in cash and cash equivalents
(57.7)
16.0
Cash and cash equivalents at the beginning of the year
189.8
173.8
Cash and cash equivalents at the end of the year
17
132.1
189.8
The above consolidated and company statements of cash flows should be read in conjunction with
the notes which form part of these financial statements.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
90
Notes to the Financial Statements
Electricity North West Limited is a private company, incorporated and domiciled in the United
Kingdom . Its registered office and principal place of business is at Electricity North West, Borron
Street, Stockport, England, SK1 2JD .
The financial statements are presented in sterling, which is the functional currency of the Company
and Group. All values are stated in million pounds (£m) unless otherwise indicated.
The financial statements are prepared on the going concern basis. Further detail on the going concern
assessment is contained in the Strategic Report, pages 40 to 41, and Note 2.
1. Adoption of new and amended standards
New and amended standards adopted by the Group and Company
In the current year, the Group and Company has applied the following amendments to IFRS Standards
issued by the International Accounting Standards Board (IASB) for an accounting period that begins
on or after 1 January 2024; their adoption has not had any material impact on the disclosures or the
amounts reported in these financial statements:
• Amendments to IAS 1: Classification of Liabilities as Current or Non-current and Non-current
Liabilities with Covenants;
• Amendments to IFRS 16: Lease Liability in a Sale and Leaseback; and
• Amendments to IAS 7 and IFRS 7: Supplier finance arrangements.
New and amended standards not yet adopted
At the date of authorisation of these financial statements, the Group and Company has not applied
the following new and revised IFRS Standards that have been issued but are not yet effective:
• Amendments to IAS 21 The Effects of Changes in Foreign Exchange Rates, effective from year
ending 31 March 2026 but is not applicable to the Group and Company;
• Amendments to IFRS 9 Financial Instruments and IFRS 7 Financial Instruments: Disclosures,
effective from year ending 31 March 2027 but is not applicable to the Group and Company;
• Amendments to IFRS 18 Presentation and Disclosure in Financial Statements, effective from
year ending 31 March 2028 ; and
• Amendments to IFRS 19 Subsidiaries without Public Accountability: Disclosures, effective from
year ending 31 March 2028 but is not applicable to the Group and Company.
The directors do not expect that the adoption of the amendments listed above will have a material
impact on the financial statements of the Group and Company in future periods.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
91
Notes to the Financial Statements (continued)
2. Material accounting policy information
The material accounting policies adopted in the preparation of these financial statements are set out
below. These policies have been applied consistently in the current and prior year.
Basis of preparation
The Group and Company financial statements have been prepared in accordance with United Kingdom
adopted international accounting standards and with the requirements of the Companies Act 2006 as
applicable to companies reporting under those standards.
The financial statements have been prepared on the historical cost basis, except for certain financial
instruments that are measured at fair value, retirement benefit scheme and certain property, plant
and equipment that were revalued in 1997. Historical cost is generally based on the fair value of the
consideration given in exchange for goods and services.
Fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly
transaction between market participants at the measurement date, regardless of whether that price
is directly observable or estimated using another valuation technique. More details on the fair value
measurements of financial instruments are given in Note 21.
Going concern
When considering whether to continue to adopt the going concern basis in preparing these financial
statements, the directors have taken into account a number of factors, including the following:
• The Company’s electricity distribution licence includes the obligation in standard licence
condition 40 to maintain an investment grade issuer credit rating, which has been met.
• Under section 3A of the Electricity Act 1989, the Gas and Electricity Markets Authority has a duty,
in carrying out its functions, to have regard to the need to secure that licence holders are able to
finance their activities, which are the subject of obligations imposed by or under Part 1 of the
Electricity Act 1989 or the Utilities Act 2000.
• Management has prepared, and the directors have reviewed and approved, Group budgets for
the year ending 31 March 2026. These budgets include profit projections and cash flow forecasts,
including covenant compliance considerations. Inherent in forecasting is an element of
uncertainty and key sensitivities are considered when budgets are approved, including possible
changes in inflation and under recoveries of allowed revenue as plausible downside scenarios.
• Management has prepared forecasts covering the current RIIO-ED2 regulatory period which runs
to April 2028, reflecting the latest forecast of regulatory revenues, performance and uncertainty
mechanisms. Forecasts demonstrate that there is sufficient headroom on key covenants and that
there are sufficient financial resources available to the Group within the forecast period.
• Management has prepared liquidity forecasts on a monthly basis, and performed inflation
sensitivities on forecasts to June 2026, being at least 12 months from the date of approval of the
financial statements.
• Short-term liquidity requirements are forecast to be met from the Group’s operating cash flows
and short-term deposit balances. At 31 March 2025, there was further liquidity available of
£250.0m in the form of committed, undrawn borrowing facilities, available for at least 12 months
from the date of approval of these financial statements.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
92
Notes to the Financial Statements (continued)
2. Material accounting policy information
Going concern (continued)
• During the 12 months from the date of approval of these financial statements, the £450m 8.875%
2026 bond is due for repayment in March 2026, and £9.4m of scheduled repayments are due
against the two EIB loans. In addition to the committed, undrawn facility mentioned above, the
Group is also a beneficiary of the £500.0m committed financial support from Scottish Power UK
plc (see below). There are no further re-financing obligations due in the next 12 months.
• Though the Group is largely financed by long-term funding, any forecast, uncommitted financing
has been removed from the assessment.
• Management prepared and considered key sensitivities to the business plan model when
assessing going concern. These sensitivities include incentive penalties, macro-economic factors
including inflation at +/-1%, DUoS revenue under collection and severe weather events.
• External factors are also considered such as, cost of living and high energy prices, interest rates,
the Ukraine conflict and impact on supply chain, and energy prices and supplier administration.
In addition to the above, on 16 June 2025 Scottish Power UK plc provided North West Electricity
Networks (Jersey) Limited (“NWEN (Jersey)”) with a letter of support detailing the financial support it
has committed to the group headed by NWEN (Jersey). An amount of £500.0m is available and can
be utilised by NWEN (Jersey) and any of its subsidiaries, including the Company. This commitment will
remain in place until the earlier of the NWEN (Jersey) group securing alternative financing, or 12
months from the date of approval of these financial statements, and will incur a charge of 20 basis
points per annum whilst in place.
After making appropriate enquiries, and with consideration of the guidance published by the Financial
Reporting Council (FRC), the directors have a reasonable expectation that the Company and the Group
have adequate resources to continue in operational existence and meet their obligations as they fall
due for the foreseeable future. In making this assessment, the directors have considered the
foreseeable future to be a period of at least 12 months from the date of approval of these financial
statements, per the FRC guidelines. Accordingly, they continue to adopt the going concern basis in
preparing the Annual Report and Consolidated Financial Statements.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
93
Notes to the Financial Statements (continued)
2. Material accounting policy information (continued)
Basis of consolidation
The consolidated financial statements incorporate the financial statements of the Company and
entities controlled by the Company (its subsidiaries), made up to 31 March each year.
Consolidation of a subsidiary begins when the Company obtains control over the subsidiary and ceases
when the Company loses control of the subsidiary. There have been no acquisitions or disposals of
subsidiaries in the current or prior year.
Subsidiaries are entities controlled by the Group. The Group controls an entity when it is exposed to,
or has rights to, variable returns from its involvement with the entity and has the ability to affect those
returns through its power over the entity. In assessing control, the Group takes into consideration
potential voting rights. The acquisition date is the date on which control is transferred to the acquirer.
The financial statements of subsidiaries are included in the consolidated financial statements from the
date that control commences until the date that control ceases.
Accounting policies are consistent in all Group companies.
All intra-group assets and liabilities, equity, income, expenses and cash flows relating to transactions
between Group members are eliminated on consolidation.
Business combinations and goodwill
Acquisitions of subsidiaries are accounted for using the acquisition method. The consideration
transferred in a business combination is measured at fair value, which is calculated as the sum of the
acquisition-date fair value of assets transferred by the Group, liabilities incurred by the Group to the
former owners of the acquiree and the equity interest issued by the Group in exchange for control of
the acquiree. Acquisition related costs are recognised in profit or loss as incurred.
Goodwill is measured as the excess of the consideration transferred and acquisition date fair value of
any previous equity interest in the acquired entity over the net of the acquisition-date amounts of the
identifiable assets acquired and liabilities assumed and is recognised as an asset.
Goodwill is allocated to cash-generating units and is not amortised, but is reviewed for impairment
annually, or more frequently when there is an indication that it may be impaired.
Investments in subsidiaries (Company only)
Investments in subsidiary undertakings are stated at cost, including any capital contributions to
subsidiaries, less any provisions for permanent diminution in value. Dividends received and receivable
are credited to profit or loss to the extent that they represent a realised profit for the Company.
Capitalisation of overheads
The costs are initially expensed to profit or loss with a portion being capitalised based on
management's assessment of the costs incurred that are directly linked to the capital work performed.
This includes internal expenditure, such as staff costs incurred in implementing and supporting the
capital projects, which are capitalised along with an appropriate proportion of overheads. The internal
expenditure is capitalised only if it can be demonstrated that it is directly attributable to the asset,
provides probable economic benefit to the Group and can be reliably measured. The nature of costs
capitalised is a key judgement and this is based on an analysis of total costs that are considered as
directly attributable to capital work. An analysis of total cost split between capital and expense is
performed and reviewed on an annual basis.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
94
Notes to the Financial Statements (continued)
2. Material accounting policy information (continued)
Revenue recognition
Revenue is measured at the fair value of the consideration received or receivable primarily for the
distribution of electricity in the normal course of business, net of VAT.
Revenue from the distribution of electricity
The Company provides services under the Distribution Connection and Use of System Agreement
(DCUSA) with its customers and derives the majority of its revenue from Distribution Use of System
(DUoS) services. The recognition of revenue from the distribution of electricity is based on actual
volumes distributed through the network and includes an assessment of the volume of unbilled energy
distributed as at the year end. There is a single performance obligation whereby the Company is
required to deliver electricity using its distribution network. The performance obligation is satisfied
over time as the customer simultaneously receives and consumes the benefits and the Company has
the right to payment for the services provided. Revenue includes unbilled income recognised relating
to volumes distributed through the network but not yet invoiced at year end.
Electricity distribution revenue is determined in accordance with the regulatory licence. Where
revenue received or receivable in the year differs from the allowed revenue permitted by regulatory
agreement, adjustments will be made to future prices to reflect this over/under recovery. This will be
taken into account in future financial year’s allowed revenue. No accounting adjustments are
therefore made for the over/under recoveries in the year that they arise or in the year in which they
are recovered.
Incentive income earned or adjustments for under/over-spend against totex allowances , are not
adjusted within revenue reported in the year within which they arise. These adjustments are factored
into allowed revenue for future periods and consequently recognised as revenue when the associated
volumes are distributed and the performance obligation is met.
Government levies
Where the Company is directed to collect or pay levies by the Regulator, Ofgem, those levies are
accounted for under IFRIC 21: Levies. In accordance with IFRIC 21, levies such as Supplier of Last Resort
(SoLR) payment levies, are recognised progressively when an obligating event takes place. SoLR levies
are directed from time to time by Ofgem, with specified payment and collection periods. In accordance
with IFRIC 21 the liability associated with the levy is triggered progressively as the associated income
becomes billable, being the defined obligating event.
Revenue from SoLR levies and the associated costs are therefore recognised proportionately over time
in profit or loss, with the levy collection being reflected in revenue and the corresponding payment of
the levy in operating costs.
Connections revenue
Connections revenue includes contract revenue for diversions and disconnections from the network
and is recognised by reference to the proportion of total costs of providing the service. The
performance obligation relates to completion of work per the terms of the contract. Consideration
received in advance of recognising the associated revenue from customers is recorded within contract
liabilities (deferred income). Customer contributions are treated as non-refundable once certain
milestones have been met. Any assets constructed in order to deliver the service are capitalised and
depreciated over their useful life.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
95
Notes to the Financial Statements (continued)
2. Material accounting policy information (continued)
Revenue recognition (continued)
Customer contributions
Customer contributions received towards distribution system assets are contract liabilities until the
performance obligations are completed. The amounts are deferred and credited to profit or loss over
the estimated weighted average useful life of the underlying assets. The performance obligation is
considered to be the provision of an ongoing network connection to the customers.
The performance obligation is regarded as satisfied over time as the Company creates a bespoke asset
for which they have no alternative use other than to provide electricity to the customer’s premises.
The Company has an enforceable right to payment for the performance completed to date.
Refundable customer contributions received in respect of property, plant and equipment are initially
held as a liability within customer contributions. These amounts may be refunded to customers if the
works do not go ahead, otherwise they will be credited to customer contributions and amortised to
revenue over the life of the project.
Dividend income
Dividend income is recognised when the Company’s right to receive payment is established.
Finance income
Interest income is accrued on a time basis, by reference to the principal outstanding and the effective
interest rate.
Leases
The Group assesses whether a contract is, or contains a lease, at inception of the contract. The Group
recognises a right-of-use asset and a corresponding lease liability with respect to all lease
arrangements in which it is the lessee, except for short-term leases and leases of low value assets. For
these leases, the Group recognises the lease payments as an operating expense on a straight-line basis
over the term of the lease unless another systematic basis is more representative of the time pattern
in which economic benefits from the leased assets are consumed.
The lease liability is initially measured at the present value of the lease payments that are not paid at
the commencement date, discounted by using either the rate implicit in the lease, or our incremental
borrowing rate.
The lease liability is subsequently measured by increasing the carrying amount to reflect interest on
the lease liability and by reducing the carrying amount to reflect the lease payments made.
The right-of-use assets comprise the initial measurement of the corresponding lease liability, lease
payments made at or before the commencement day, less any lease incentives received and any initial
direct costs. They are subsequently measured at cost less accumulated depreciation and impairment
losses.
Right-of-use assets are depreciated over the shorter period of lease term and useful life of the
underlying asset. The depreciation starts at the commencement date of the lease.
The Group applies IAS 36: Impairment of assets to determine whether a right-of-use asset is impaired
and accounts for any identified impairment loss as described in the ‘Property, Plant and Equipment’
policy.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
96
Notes to the Financial Statements (continued)
2. Material accounting policy information (continued)
Borrowing Costs
Borrowing costs directly attributable to the acquisition, construction or production of qualifying
assets, which are assets that necessarily take a substantial period of time to get ready for their
intended use or sale, are added to the cost of those assets, until such time as the assets are
substantially ready for their intended use or sale.
All other borrowing costs are recognised in profit or loss in the period in which they are incurred.
Retirement benefit costs
Payments to the defined contribution retirement benefit scheme are recognised as an expense when
employees have rendered service entitling them to the contributions.
The defined benefit pensions scheme is provided through a division of the Electricity Supply Pension
Scheme (ESPS). The most recent actuarial valuation for the scheme for funding purposes was carried
out at 31 March 2022; agreed actuarial valuations are carried out thereafter at intervals of not more
than three years. A subsequent triennial valuation as at 31 March 2025 is currently underway;
however, the process remains at an early stage, and preliminary results are not anticipated until the
second half of 2025.
Results are affected by the actuarial assumptions used, which are disclosed in Note 23. Actual
experience may differ from the assumptions made, for example, due to changing market and
economic conditions and longer or shorter lives of participants.
Defined benefit costs are split into three categories:
• current service cost, past service cost and gains and losses on curtailments and settlements,
recognised in employee costs (see Note 6) in the income statement;
• net interest expense or income, recognised within finance costs (see Note 9) in profit or loss;
and
• re-measurement comprising actuarial gains and losses and the return on scheme assets
(excluding interest) are recognised immediately in the statement of financial position with a
charge or credit to other comprehensive income in the period in which they occur.
Defined benefit assets are measured at fair value while liabilities are measured at present value. The
difference between the two amounts is recognised as a surplus or obligation in the statement of
financial position.
IFRIC14 IAS 19: The Limit on a Defined Benefit Asset, Minimum Funding Requirements and their
Interaction was published by the interpretations committee of the International Accounting Standards
Board in July 2007 and was adopted during the year ended 31 March 2008. IFRIC14 provides guidance
on the extent to which a pension scheme surplus should be recognised as an asset and may also
require additional liabilities to be recognised where minimum funding requirements exist. Legal
opinion was obtained that a pension surplus could be recovered on wind up of the scheme and could,
therefore, be recognised, along with associated liabilities.
The Group has concluded that, when a defined benefit asset exists, it can recognise the full amount of
this surplus on the grounds that it could gain sufficient economic benefit from the refund of the surplus
assets that would be available to it following the final payment to the last beneficiary of the Scheme.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
97
Notes to the Financial Statements (continued)
2. Material accounting policy information (continued)
Taxation
The tax expense represents the sum of current and deferred tax charges for the financial year,
adjusted for prior year items.
Current taxation
Current tax is based on taxable profit for the year and is calculated using tax rates and laws that have
been enacted or substantively enacted by the balance sheet date. Taxable profit differs from the net
profit as reported in profit or loss because it excludes items of income or expense that are taxable or
deductible in other years, and it further excludes items that are never taxable or deductible.
Deferred taxation
Deferred tax is the tax expected to be payable or recoverable on differences between the carrying
amounts of assets and liabilities in the financial statements and the corresponding tax bases used in
the computation of taxable profit and is accounted for using the balance sheet liability method.
Deferred tax liabilities are generally recognised for all taxable temporary differences and deferred tax
assets are recognised to the extent that it is probable that taxable profits will be available against
which deductible temporary differences can be utilised. Such assets and liabilities are not recognised
if the temporary difference arises from the initial recognition of goodwill or from the initial recognition
(other than in a business combination) of other assets and liabilities in a transaction that affects
neither the taxable profit nor the accounting profit.
Deferred tax liabilities are recognised for taxable temporary differences arising on investments in
subsidiaries, except where the Group is able to control the reversal of the temporary difference and
it is probable that the temporary difference will not reverse in the foreseeable future.
Deferred tax is calculated at the tax rates that are expected to apply in the period when the liability is
settled, or the asset is realised based on tax rates and laws that have been enacted or substantively
enacted at the balance sheet date.
The carrying amount of deferred tax assets is reviewed at each balance sheet date and reduced to the
extent that it is no longer probable that sufficient taxable profits will be available to allow all or part
of the asset to be recovered. Deferred tax is charged or credited to profit or loss, except when it
relates to items charged or credited in other comprehensive income, in which case the deferred tax is
also dealt with in other comprehensive income.
Intangible assets
Intangible assets with finite useful economic lives are measured initially at cost and are amortised on
a straight-line basis over their estimated useful lives. The carrying amount is reduced by any provision
for impairment where necessary.
Amortisation periods for categories of intangible assets are:
Computer software 1-12 years
Intangible assets under construction are not amortised. Amortisation commences from the date the
intangible asset is available for use.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
98
Notes to the Financial Statements (continued)
2. Material accounting policy information (continued)
Property, plant and equipment
Property, plant and equipment comprise: operational structures; non-operational land and buildings;
fixtures, equipment, vehicles and other assets, and right of use assets.
Operational structures
Infrastructure assets are depreciated by writing off their cost, less the estimated residual value, evenly
over their useful lives, which range from 5 to 84 years. Employee costs incurred in implementing the
capital schemes of the Group are capitalised within operational structure assets.
In 1997 the Company undertook a revaluation of certain assets following a business combination. This
resulted in the creation of a revaluation reserve of £234.9m. The additional depreciation, as a result
of the revaluation, is transferred from the revaluation reserve to retained earnings on an annual basis.
Assets other than operational structures
All other property, plant and equipment is stated at historical cost less accumulated depreciation and
accumulated impairment losses.
Historical cost includes expenditure that is directly attributable to the acquisition of the items and
includes costs directly attributable to making the asset capable of operating as intended. Subsequent
costs are included in the asset’s carrying amount or recognised as a separate asset, as appropriate,
only when it is probable that future economic benefits associated with the item will flow to the Group
and the cost of the item can be measured reliably. All other repairs and maintenance are charged to
profit or loss during the financial year in which they are incurred.
Assets under construction are carried at cost, less any recognised impairment loss. Such assets are
classified to the appropriate categories of property, plant and equipment when completed and ready
for intended use. When the asset is capitalised during the year, any spend in the year is directly
classified to the appropriate categories of property, plant and equipment. Depreciation on these
assets, on the same basis as other assets, commences when the assets are commissioned.
Freehold land and assets in the course of construction are not depreciated until the asset is available
for use.
Depreciation is provided on other assets on a straight-line basis over its expected useful life as follows:
Non-operational land and buildings 30-84 years
Fixtures, equipment, vehicles and other 2-40 years
Right of use assets 3-60 years
Depreciation methods and useful lives are re-assessed annually and, if necessary, changes are
accounted for prospectively.
The gain or loss arising on the disposal or retirement of an asset is determined as the difference
between the sale proceeds and the carrying amount of the asset and is recognised in profit or loss.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
99
Notes to the Financial Statements (continued)
2. Material accounting policy information (continued)
Impairment of tangible and intangible assets
Tangible and intangible assets are assessed for impairment at each balance sheet date to determine
whether there is any indication that those assets have suffered an impairment loss. If any such
indication exists, the recoverable amount of the asset is estimated to determine the extent of the
impairment loss, if any. Where the asset does not generate cash flows that are independent from
other assets, the Group estimates the recoverable amount of the cash-generating unit to which the
asset belongs.
An intangible asset with an indefinite useful life and goodwill acquired in a business combination are
required to be tested for impairment at least annually and whenever there is an indication that the
asset may be impaired. For the purposes of impairment testing the Group have determined that there
is only one cash generating unit (CGU), therefore we test annually for impairment on all non-current
assets.
The recoverable amount is the higher of fair value less costs of disposal and value in use. The fair
value less costs of disposal (FVLCD) represents the net present value of expected future cash flows,
discounted using a rate that reflects current market assessments of the time value of money and the
risks specific to the asset for which the estimates of future cash flows have not been adjusted.
If the recoverable amount of an asset (or cash-generating unit) is estimated to be less than its carrying
amount, the carrying amount of the asset (or cash-generating unit) is reduced to its recoverable
amount. An impairment loss is recognised immediately in profit or loss.
Where an impairment loss subsequently reverses, the reversal is recognised immediately in profit or
loss and the carrying amount of the asset is increased to the revised estimate of its recoverable
amount, but not so as to exceed the carrying amount that would have been determined had no
impairment loss been recognised in prior years. Goodwill and other indefinite assets are never
reversed.
Research and development
Research costs are recognised in profit or loss as incurred. Development expenditure on an individual
project is recognised as an intangible asset when the Group can demonstrate: the technical feasibility
of completing the intangible asset so that it will be available for use, its intention to complete and its
ability to use the asset, how the asset will generate future economic benefits, the availability of
resources to complete the asset and the ability to reliably measure the expenditure incurred during
development.
Inventories
Inventories are stated at the lower of cost and net realisable value. Cost is based on weighted average
cost or actual cost and includes expenditure incurred in acquiring the inventories, conversion costs
and other costs in bringing them to their present location and condition. Net realisable value
represents the estimated selling price, net of estimated costs of selling.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
100
Notes to the Financial Statements (continued)
2. Material accounting policy information (continued)
Financial instruments
Financial assets and financial liabilities are recognised in the balance sheet when the Group becomes
a party to the contractual provisions of the instrument.
Financial assets and financial liabilities are initially measured at fair value. Transaction costs that are
directly attributable to the acquisition or issue of financial assets and financial liabilities (other than
financial assets and financial liabilities at fair value through profit or loss are added or deducted from
the fair value of the financial assets or financial liabilities, as appropriate, on initial recognition.
Transaction costs, directly attributable to the acquisition of financial assets or financial liabilities at fair
value through profit or loss, are recognised immediately in profit or loss.
If the transaction price differs from fair value at initial recognition, the Group will account for such
difference as follows:
• if fair value is evidenced by a quoted price in an active market for an identical asset or liability
or based on a valuation technique that uses only data from observable markets, then the
difference is recognised as a gain or loss on initial recognition (i.e. day 1 profit or loss); and
• in all other cases, the fair value will be adjusted to bring it in line with the transaction price
(i.e. day 1 profit or loss will be deferred by including it in the initial carrying amount of the
asset or liability).
After initial recognition, the deferred gain or loss will be released to profit or loss such that it reaches
a value of zero at the time when the contract can be valued using active market quotes or verifiable
objective market information. The Group policy for the amortisation of day 1 gain or loss is to release
it in a reasonable fashion based on the facts and circumstances (e.g. using a straight-line amortisation).
Financial assets
All regular way purchases or sales of financial assets are recognised and derecognised on a trade date
basis. Regular way purchases or sales are purchases or sales of financial assets that require delivery
of assets within the time frame established by regulation or convention in the marketplace.
All recognised financial assets are measured subsequently in their entirety at either amortised cost or
fair value, depending on the classification of the financial assets.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
101
Notes to the Financial Statements (continued)
2. Material accounting policy information (continued)
Classification of financial assets
Financial assets that meet the following conditions are measured subsequently at amortised cost:
• the financial asset is held within a business model whose objective is to hold financial assets
in order to collect contractual cash flows; and
• the contractual terms of the financial asset give rise on specified dates to cash flows that are
solely payments of principal and interest on the principal amount outstanding.
Financial assets that meet the following conditions are measured subsequently at fair value through
other comprehensive income (FVTOCI):
• the financial asset is held within a business model whose objective is achieved by both
collecting contractual cash flows and selling the financial assets; and
• the contractual terms of the financial asset give rise on specified dates to cash flows that are
solely payments of principal and interest on the principal amount outstanding.
The Company and Group have no financial assets at FVTOCI.
By default, all other financial assets are measured subsequently at fair value through profit or loss
(FVTPL).
Amortised cost and effective interest method
The effective interest method is a method of calculating the amortised cost of a debt instrument and
of allocating interest income over the relevant period.
The effective interest rate is the rate that exactly discounts estimated future cash receipts (including
all fees and points paid or received that form an integral part of the effective interest rate, transaction
costs and other premiums or discounts) excluding expected credit losses, through the expected life of
the debt instrument, or, where appropriate, a shorter period, to the gross carrying amount of the debt
instrument on initial recognition.
The amortised cost of a financial asset is the amount at which the financial asset is measured at initial
recognition minus the principal repayments, plus the cumulative amortisation using the effective
interest method of any difference between that initial amount and the maturity amount, adjusted for
any loss allowance. The gross carrying amount of a financial asset is the amortised cost of a financial
asset before adjusting for any loss allowance.
Income is recognised using the effective interest method for debt instruments measured subsequently
at amortised cost and at FVTOCI. For financial assets other than purchased or originated credit-
impaired financial assets, interest income is calculated by applying the effective interest rate to the
gross carrying amount of a financial asset, except for financial assets that have subsequently become
credit-impaired. The Group has no financial assets purchased or originated credit-impaired, or that
have subsequently become credit-impaired.
Interest income is recognised in profit or loss and is included in the ‘Finance income’ line item.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
102
Notes to the Financial Statements (continued)
2. Material accounting policy information (continued)
Financial assets at FVTPL
Financial assets that do not meet the criteria for being measured at amortised cost or FVTOCI are
measured at FVTPL. Specifically, the financial assets held by the Group classified as at FVTPL are
derivatives and are stated at fair value, with any fair value gains or losses recognised in profit or loss
to the extent they are not part of a designated hedge accounting relationship. Fair value is determined
in the manner described in Note 21.
Impairment of financial assets
The Group recognises a loss allowance for expected credit losses on investments in debt instruments
that are measured at amortised cost or at FVTOCI, trade receivables and contract assets; the Group
holds no lease receivables or financial guarantee assets. The amount of expected credit losses is
updated at each reporting date to reflect changes in credit risk since initial recognition of the
respective financial instrument.
The Group always recognises lifetime expected credit losses (ECL) for trade receivables and contract
assets. The expected credit losses on these financial assets are estimated using a provision matrix
based on the Group’s historical credit loss experience, adjusted for factors that are specific to the
debtors, general economic conditions and an assessment of both the current as well as the forecast
direction of conditions at the reporting date, including time value of money where appropriate.
For all other financial instruments, the Group recognises lifetime ECL when there has been a significant
increase in credit risk since initial recognition. However, if the credit risk on the financial instrument
has not increased significantly since initial recognition, the Group measures the loss allowance for that
financial instrument at an amount equal to 12-month ECL.
Lifetime ECL represents the expected credit losses that will result from all possible default events over
the life of a financial instrument. In contrast, 12-month ECL represents the portion of lifetime ECL that
is expected to result from default events on a financial instrument that are possible within 12 months
after the reporting date.
a) Significant increase in credit risk
In assessing whether the credit risk on a financial instrument has increased significantly since initial
recognition, the Group compares the risk of a default occurring on the financial instrument at the
reporting date with the risk of a default occurring on the financial instrument at the date of initial
recognition. In making this assessment, the Group considers both quantitative and qualitative
information that is reasonable and supportable, including historical experience and forward-looking
information that is available without undue cost or effort.
Irrespective of the outcome of the above assessment, the Group presumes that the credit risk on a
financial asset has increased significantly since initial recognition when contractual payments are
more than 30 days past due, unless the Group has reasonable and supportable information that
demonstrates otherwise.
Despite the foregoing, the Group assumes that the credit risk on a financial instrument has not
increased significantly since initial recognition if the financial instrument is determined to have low
credit risk at the reporting date. A financial instrument is determined to have low credit risk if the
financial instrument has a low risk of default and the debtor has a strong capacity to meet its
contractual cash flow obligations in the near-term.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
103
Notes to the Financial Statements (continued)
2. Material accounting policy information (continued)
Impairment of financial assets (continued)
The Group regularly monitors the effectiveness of the criteria used to identify whether there has been
a significant increase in credit risk and revises them as appropriate to ensure that the criteria are
capable of identifying a significant increase in credit risk before the amount becomes past due.
b) Definition of default
The Group considers that default has occurred when a financial asset is more than 90 days past due,
unless the Group has reasonable and supportable information to demonstrate that a more lagging
default criterion is more appropriate.
c) Credit-impaired financial assets
A financial asset is credit-impaired when one or more events that have a detrimental impact on the
estimated future cash flows of that financial asset have occurred.
d) Measurement and recognition of expected credit losses
The measurement of expected credit losses is a function of the probability of default, loss given default
and the exposure at default. The assessment of the probability of default and loss given default is
based on historical data adjusted by forward-looking information. The exposure at default is
represented by the assets’ gross carrying amount at the reporting date.
For financial assets, the expected credit loss is estimated as the difference between all contractual
cash flows that are due to the Group in accordance with the contract and all the cash flows that the
Group expects to receive, discounted at the original effective interest rate.
If the Group has measured the loss allowance for a financial instrument at an amount equal to lifetime
ECL in the previous reporting period but determines at the current reporting date that the conditions
for lifetime ECL are no longer met, the Group measures the loss allowance at an amount equal to 12-
month ECL at the current reporting date, except for assets for which the simplified approach was used.
The Group recognises an impairment gain or loss in profit or loss for all financial instruments with a
corresponding adjustment to their carrying amount through a loss allowance account.
Derecognition of financial assets
The Group derecognises a financial asset only when the contractual rights to the cash flows from the
asset expire, or when it transfers the financial asset and substantially all the risks and rewards of
ownership of the asset to another entity.
On derecognition of a financial asset measured at amortised cost, the difference between the asset’s
carrying amount and the sum of the consideration received and receivable is recognised in profit or
loss.
Cash and cash equivalents
Cash and cash equivalents include cash at bank, deposits, other short-term highly liquid investments
which are readily convertible into known amounts of cash and have an original maturity of three
months or less and which are subject to an insignificant risk of change in value. The restrictions on
cash held in ring-fenced bank accounts in relation to regulatory projects do not change the nature of
the assets, only the purpose for which they can be used, thus these assets are included in cash and
cash equivalents.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
104
Notes to the Financial Statements (continued)
2. Material accounting policy information (continued)
Money market deposits
Money market deposits with terms to maturity in excess of three months are not included as cash or
cash equivalents and are separately disclosed on the face of the statement of financial position.
Financial liabilities and equity
Debt and equity instruments are classified as either financial liabilities or as equity in accordance with
the substance of the contractual arrangements and the definitions of a financial liability and an equity
instrument.
Equity instruments
An equity instrument is any contract that evidences a residual interest in the assets of an entity after
deducting all of its liabilities. Equity instruments issued by the Group are recognised at the proceeds
received, net of direct issue costs.
Financial liabilities
All financial liabilities are measured subsequently at amortised cost using the effective interest
method or at FVTPL.
Financial liabilities measured subsequently at FVTPL
Financial liabilities at FVTPL are measured at fair value, with any gains or losses arising on changes in
fair value recognised in profit or loss to the extent that they are not part of a designated hedging
relationship. The Group has no financial liabilities designated at FVTPL. Fair values is determined in
the manner described in Note 20.
Financial liabilities measured subsequently at amortised cost
Financial liabilities that are not at FVTPL are measured subsequently at amortised cost using the
effective interest method.
The effective interest method is a method of calculating the amortised cost of a financial liability and
of allocating interest expense over the relevant period. The effective interest rate is the rate that
exactly discounts estimated future cash payments (including all fees and points paid or received that
form an integral part of the effective interest rate, transaction costs and other premiums and
discounts) through the expected life of the financial liability, or (where appropriate) a shorter period,
to the amortised cost of a financial liability.
Trade payables
Trade payables are initially recorded at fair value and subsequently at amortised cost.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
105
Notes to the Financial Statements (continued)
2. Material accounting policy information (continued)
Derecognition of financial liabilities
The Group derecognises financial liabilities when, and only when, the Group’s obligations are
discharged, cancelled or have expired. The difference between the carrying amount of the financial
liability derecognised and the consideration paid and payable is recognised in profit or loss.
When the Group exchanges with the existing lender one debt instrument into another one with the
substantially different terms, such exchange is accounted for as an extinguishment of the original
financial liability and the recognition of a new financial liability. Similarly, the Group accounts for
substantial modification of terms of an existing liability, or part of it, as an extinguishment of the
original financial liability and the recognition of a new liability. It is assumed that the terms are
substantially different if the discounted present value of the cash flows under the new terms, including
any fees paid net of any fees received and discounted using the original effective rate is at least 10%
different from the discounted present value of the remaining cash flows of the original financial
liability.
Derivative financial instruments
The Group enters into a variety of derivative financial instruments to manage its exposure to interest
rate and inflation risk. Further details of derivatives are disclosed in Note 20.
Derivatives are recognised initially at fair value at the date a derivative contract is entered into and
are subsequently re-measured to their fair value at each reporting date. The resulting gain or loss is
recognised in profit or loss, in finance expenses, immediately unless the derivative is designated in a
hedging relationship.
A derivative with a positive fair value is recognised as a financial asset whereas a derivative with a
negative fair value is recognised as a financial liability. A derivative is presented as a non-current asset
or a non-current liability if the remaining maturity of the instrument is more than 12 months and it is
not expected to be realised or settled within 12 months. Other derivatives are presented as current
assets or current liabilities.
Embedded derivatives
An embedded derivative is a component of a hybrid contract that also includes a non-derivative host,
with the effect that some of the cash flows of the combined instrument vary in a way similar to a
stand-alone derivative.
Derivatives embedded in hybrid contracts with a financial asset host within the scope of IFRS 9:
Financial Instruments are not separated. The entire hybrid contract is classified and subsequently
measured as either amortised cost or fair value as appropriate.
Derivatives embedded in hybrid contracts with hosts that are not financial assets within the scope of
IFRS 9 are treated as separate derivatives when they meet the definition of a derivative, their risks
and characteristics are not closely related to those of the host contracts and the host contracts are
not measured at FVTPL.
An embedded derivative is presented as a non-current asset or non-current liability if the remaining
maturity of the hybrid instrument to which the embedded derivative relates is more than 12 months
and is not expected to be realised or settled within 12 months.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
106
Notes to the Financial Statements (continued)
2. Material accounting policy information (continued)
Hedge accounting
The Group considers hedge accounting when entering any new derivative, however, there are
currently no formal hedge accounting relationships in the Group.
Provisions
Provisions are recognised when the Group has a present obligation (legal or constructive) as a result
of a past event, it is probable that the Group will be required to settle that obligation and a reliable
estimate can be made of the amount of the obligation.
The amount recognised as a provision is the best estimate of the consideration required to settle the
present obligation at the reporting date, taking into account the risks and uncertainties surrounding
the obligation. Where a provision is measured using the cash flows estimated to settle the present
obligation, its carrying amount is the present value of those cash flows (when the effect of the time
value of money is material).
Contract liability
Contract liabilities are recognised when a customer has paid an amount of consideration prior to the
Group performing the transfer of the related good or service to the customer. An example would be
for deferred revenue in relation to receipts in advance from our capital projects, diversions and service
connections.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
107
Notes to the Financial Statements (continued)
3. Critical accounting judgements and key sources of estimation uncertainty
In the application of the Group’s accounting policies, which are described in Note 2, the directors are
required to make judgements (other than those involving estimations) that have a significant impact
on the amounts recognised and to make estimates and assumptions about the carrying amounts of
assets and liabilities that are not readily apparent from other sources. The estimates and associated
assumptions are based on historical experience and other factors that are considered to be relevant.
Actual results may differ from these estimates.
The estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to accounting
estimates are recognised in the period in which the estimate is revised if the revision affects only that
period; or in the period of the revision and future periods if the revision affects both current and future
periods.
Critical judgements in applying the Group’s accounting policies
The following are the critical judgements, apart from those involving estimations (which are presented
separately below), that the directors have made in applying the Group’s accounting policies and that
have the most significant effect on the amounts recognised in the financial statements.
Capitalisation of overheads – nature of costs capitalised
The Group recognises infrastructure assets where the expenditures incurred enhance or increase the
capacity of the network. Capital projects often contain a combination of enhancement and
maintenance activity which are not distinct and, therefore the allocation of costs between capital and
operating expenditure requires a level of judgement. The costs are initially expensed to profit or loss
with a portion being capitalised based on management’s assessment of the costs incurred that are
directly linked to the capital work performed. Any expenditure classed as maintenance is expensed
in the period incurred. The nature of costs to be included for capitalisation is a key judgement and is
based on an analysis of activities directly attributable to capital work.
Key sources of estimation uncertainty
The key assumptions concerning the future, and other key sources of estimation uncertainty that may
have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities
within the next financial year, are outlined below.
Capitalisation of overheads – capitalisation rate
The Group recognises infrastructure assets where the expenditures incurred enhance or increase the
capacity of the network. The capitalisation rate is a key estimate as it is based on an analysis of total
costs and total labour costs, split between capital and expense. This includes an estimation of time
spent by support function staff. The capitalisation rate is reviewed on an annual basis. See Note 6 for
details on value of employee costs capitalised in the year.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
108
Notes to the Financial Statements (continued)
3. Critical accounting judgements and key sources of estimation uncertainty (continued)
Key sources of estimation uncertainty (continued)
Capitalisation of overheads – capitalisation rate (continued)
The following table shows the pre-tax amount by which the impact on profit or loss would be adjusted
for the given change in capitalisation rate; an increase in rate would result in a gain in profit or loss
and vice versa.
2025
2024
Gain/(loss)
£m
£m
Change in rate +/- 1%
1.4/(1.4)
1.4/(1.4)
Change in rate +/- 5%
7.1/(7.1)
6.8/(6.8)
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
109
Notes to the Financial Statements (continued)
3. Critical accounting judgements and key sources of estimation uncertainty (continued)
Key sources of estimation uncertainty (continued)
Impairment of tangible and intangible assets (including goodwill)
During the year, the Group was acquired by Scottish Power Energy Networks Limited, part of the group
headed by Iberdrola, S.A., with an implied enterprise value significantly in excess of the carrying value
of the relevant assets. Given there have been no significant events or changes between the acquisition
date and year end date that suggest a material deterioration in the value of assets, it can be concluded
that there are no indications of impairment at 31 March 2025.
Management are required to assess the impairment of intangibles and goodwill annually. As these
are part of the single cash generating unit that has been identified, management assesses the
recoverability of tangible and intangible assets together, on an annual basis. Determining whether
any of those assets are impaired requires an estimation of the recoverable amount of the asset to the
Group, with the recoverable amount being the higher of fair value less cost of disposal and value in
use. This calculation requires the Group to estimate the future cash flows expected to arise from the
asset and a suitable discount rate in order to calculate present value for the asset and compare that
to its carrying value. This concluded that no impairment loss is required against those assets (2024:
nil). Details of the impairment loss testing is set out in Note 11.
Fair value of derivative financial instruments
In estimating the fair value of derivative financial instruments, the Group uses market-observable data
(Level 1 and 2 inputs) to the extent it is available. Where such data is not available, certain estimates
(Level 3 inputs) regarding inputs to the valuation are required to be made. The inputs regarding the
Group’s credit risk are deemed to be Level 3 inputs, as there are no observable credit related inputs
for the Group at commonly quoted intervals or otherwise interpolated for substantially the full term
of the instruments. The credit risk profile of the Group has been based on a UK utility credit curve
provided by a third-party data provider. It is this assumption that is deemed to be Level 3. Level 3
inputs form a significant part of the fair value of the financial instruments held by the Group.
Information about the valuation techniques, inputs used and sensitivities are disclosed in Note 20 and
Note 22.
Retirement benefit schemes
The Group’s defined benefit obligation is derived using various assumptions, as disclosed in Note 23.
Results can be affected significantly by the assumptions used, which management decide based on
advice by a firm of actuaries.
Where available, market data is used to value assets, however for some less liquid assets, up-to-date
data is not available, certain estimates regarding inputs to the valuation are required to be made, as
disclosed in Note 23, along with sensitivities of certain key inputs.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
110
Notes to the Financial Statements (continued)
4. Revenue
2025
2024
Group and Company
£m
£m
Revenue
654.4
598.1
Predominantly all Group revenue arise from one operating segment, electricity distribution in the
North West of England and associated activities. This is regularly reviewed by the Chief Executive
Officer and Executive Leadership Team.
Included within the above are revenues from four customers (2024: three), each of which represented
more than 10% of the total revenue. Revenue from these customers totalled £320.7m (2024:
£207.8m), which includes £94.8m from Customer A (2024: £82.5m), £72.4m from Customer B (2024:
£63.9m), £74.8m from Customer C (2024: £61.4m) and £78.7m from Customer D (2024: £50.9m). No
other customer represented more than 10% of revenues either this year or in the prior year.
Where the Company is directed to collect or pay levies by the Regulator, Ofgem, those levies are
accounted for under IFRIC21. For the year ended 31 March 2025, revenue includes £0.8m of SoLR
levies (2024: £22.0m). However, immediately at the point the levy becomes billable, the entire value
of the levy is paid over to suppliers, with the Company making no profit from its role in the process.
The costs of the levy are shown as an operating expense (Note 5).
In the current year, £21.8m (2024: £20.9m) of customer contributions have been amortised through
revenue in line with IFRS 15 (Note 24 and 34).
Of the revenue recognised in the year, £3.9m (2024: £2.3m) was included in the contract liability at
the beginning of the year.
5. Operating profit
The following items have been included in arriving at operating profit:
Group and Company
2025
2024
Expense/(income)
£m
£m
Employee costs (Note 6)
80.0
76.7
Depreciation and amortisation expense:
Depreciation of property, plant and equipment
1
(Note 11 & 34)
142.8
132.5
Amortisation of intangible assets (Note 13 & 34)
14.2
14.2
157.0
146.7
Supplier of Last Resort levy costs (Note 4)
0.8
22.0
Profit on disposal of property, plant and equipment (Note 34)
(0.5)
(0.2)
Research and development
2.4
1.9
1
This includes £1.9m (2024: £1.8m) depreciation of right of use assets (Note 11).
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
111
Notes to the Financial Statements (continued)
5. Operating profit (continued)
During the year, the fees payable to the Company’s auditor and its associates were as follows:
2025
2024
Group and Company
£m
£m
Audit of the Group and Company financial statements
1
0.5
0.4
Audit-related assurance services
0.1
0.1
Total fees
0.6
0.5
1
All these fees relate to the Company; no fees were payable in relation to the subsidiaries of the
Company as they are dormant. The fees for the current year include £31,881 of overrun fees in relation
to the prior year (2024: £97,924).
Non-audit related services to the Group and Company were £17,172 (2024: £16,200).
6. Employee costs
2025
2024
Group and Company
£m
£m
Wages and salaries
149.9
137.1
Social security costs
17.1
15.8
Pension costs – defined benefit schemes (Note 23)
7.5
7.9
Pension costs – defined contribution schemes (Note 23)
11.2
9.9
Total employee costs (including directors’ remuneration)
185.7
170.7
Costs transferred directly to fixed assets
(105.7)
(94.0)
Charged to operating costs (Note 5)
80.0
76.7
All employees and employee costs relate to the Company.
The average monthly number of employees during the year (including Executive directors):
2025
2024
Group and Company
Number
Number
Craft, Technical and Engineering
1,152
1,114
Administration
1,035
989
Average number of employees
2,187
2,103
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
112
Notes to the Financial Statements (continued)
7. Directors’ remuneration
The number of directors during the year is set out and analysed by category in the table below:
2025
2024
Group and Company
Number
Number
Remunerated directors
8
7
Non-remunerated directors*
8
6
Total number of directors
16
13
*There were 5 alternate directors (2024: 4 alternate directors) in addition to this as stated in page 69.
The compensation paid or payable to directors is shown in the table below:
2025
2024
£m
£m
Salaries and other short-term employee benefits
1.7
1.4
Accrued bonus
1.8
0.9
Amounts receivable under long-term incentive schemes
-
0.7
Total emoluments solely in relation to services provided to the
Company
3.5
3.0
Additional amounts of bonuses in relation to the sale of the NWEN
(Jersey) group and continuing employment by the company*
2.0
-
Total emoluments (Note 32)
5.5
3.0
*These amounts were borne by other Group companies and not recharged to the company itself.
The aggregate emoluments of the directors in 2025 amounted to £5.5m (2024: £3.0m). Emoluments
comprise salaries, fees, taxable benefits, and the value of short-term and long-term incentive awards.
The aggregated emoluments of the highest paid director in 2025 in respect of services to the Group
amounted to £2.8m (2024: £1.6m). Under the Executive Incentive Plan bonuses are awarded and
either paid in the following financial year (accrued bonus) or paid in subsequent years (amounts
receivable under long-term incentive schemes); no shares were received or receivable by any director.
In the year additional bonus payments and fees amounting to £2.0m were receivable by the directors
in relation to the sale of the NWEN (Jersey) group, including the Company, and were paid by NWEN
(Jersey) Limited. The additional payments and fees in relation to the highest paid director was £1.1m.
As at 31 March 2024 and 2025, there were no amounts payable for post-employment benefits, other
long-term benefits and termination benefits. The pension contributions for the highest paid director
for the year ended 31 March 2025 were £nil (2024: £nil). The accrued pension at 31 March 2025 for
the highest paid director was £nil (2024: £nil).
As at 31 March 2024 and 2025 the directors had no interests in the ordinary shares of the Company.
8. Finance income
2025
2024
Group and Company
£m
£m
Interest receivable on short-term bank deposits
6.7
21.0
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
113
Notes to the Financial Statements (continued)
9. Finance costs
2025
2024
Group and Company
£m
£m
Finance costs (excluding unrealised fair value movements):
Interest on group borrowings at amortised cost (Note 32)
30.0
29.6
Interest on external borrowings at amortised cost
39.3
41.2
Net interest settlements on derivatives at fair value
5.9
5.4
Indexation of index-linked debt (Note 19 & 34)
9.6
31.0
Accretion paid on index-linked swaps
-
87.0
Reimbursement of inter-company loan impairment (Note 22 & 32)
(0.2)
(0.4)
Interest on leases (Note 19)
0.3
0.3
Net interest income on pension plan
(2.1)
(2.2)
Amount capitalised
1
(Note 11)
(2.1)
(1.3)
80.7
190.6
Fair value movements on financial instruments
2
:
Inter-company derivative asset (Note 32)
24.9
95.2
Inter-company derivative liability (Note 32)
(24.9)
(95.2)
Derivative assets
(15.3)
(13.4)
Derivative liabilities
(26.3)
(88.9)
(41.6)
(102.3)
Total finance costs
39.1
88.3
1
The amount of borrowing costs capitalised was determined using a capitalisation rate of 4.87% (2024:
4.13%), derived from the total general borrowing costs for the year divided by the average total
general borrowings outstanding during the year.
2
Details on the valuation techniques used to derive the fair value can be found in Note 20.
There have been £nil (2024: £87.0m) accretion payments on the index-linked swaps in the year; these
are scheduled five-yearly, seven-yearly and ten-yearly with the next payment due in July 2027. The
amount of accretion accrued over the year was £17.5m (2024: £24.9m), split as follows:
Five-yearly
Seven-yearly
Ten-yearly
Total
Group and Company
£m
£m
£m
£m
Accumulated Accretion
1 April 2023
8.1
79.1
39.2
126.4
Accrued in year
5.9
11.8
7.2
24.9
Paid in year
-
(87.0)
-
(87.0)
31 March 2024
14.0
3.9
46.4
64.3
Accrued in year
4.1
8.4
5.0
17.5
Paid in year
-
-
-
-
31 March 2025
18.1
12.3
51.4
81.8
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
114
Notes to the Financial Statements (continued)
10. Income tax expense
2025
2024
Group and Company
£m
£m
Current tax:
Current year
18.6
21.0
Adjustment in respect of prior year
0.1
(5.9)
18.7
15.1
Deferred tax: (Note 25)
Current year
44.4
18.7
Adjustments in respect of prior year
(1.2)
7.9
43.2
26.6
Income tax expense
61.9
41.7
Corporation tax is calculated at 25% (2024: 25%) of the estimated assessable profit for the year.
Deferred tax is calculated at 25% (2024: 25%), being the rate at which it is expected to reverse. There
is no unrecognised deferred tax in the Group.
The table below reconciles the notional tax charge at the UK corporation tax rate to the effective tax
rate for the year:
2025
2024
Group and Company
£m
£m
Profit before income tax
248.4
161.8
Tax at the UK corporation tax rate of 25% (2024: 25%)
62.1
40.5
Non-taxable expense/(income)
0.9
(0.8)
Adjustments in respect of prior year
(1.1)
2.0
Income tax expense
61.9
41.7
Pillar Two model rules
The ultimate parent company of the Group is Iberdrola, S.A., a company based in Spain. Iberdrola,
S.A. is the parent company of a global group within the scope of the Organisation for Economic Co-
operation and Development’s Pillar Two model rules and is, therefore, responsible for calculating the
multinational top up tax for the Iberdrola group. The Iberdrola group is not within the scope of multi-
national top-up tax.
The UK has enacted legislation to incorporate the Pillar Two model rules with effect from 1 January
2024. This includes domestic top up tax (“DTT”) legislation. From 20 March 2025, the date Iberdrola,
S.A. gained control of the Group, the Group will be consolidated into the Iberdrola group and falls into
the scope of the Pillar Two and DTT rules. An assessment has been undertaken to determine if there
is a risk of exposure to UK DTT for the period from 20 March 2025 to 31 March 2025. Based on the
prescribed rules in the Pillar Two legislation, the calculated UK effective tax rate is assessed to be
above 15% and thus no UK DTT charge is expected. The Group has applied the exception available in
IAS 12 ‘Income Taxes: International Tax Reform – Pillar Two Model Rules’ and has not recognised or
disclosed information about deferred tax assets and liabilities related to Pillar Two income taxes.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
115
Notes to the Financial Statements (continued)
11. Property, plant and equipment
Non-
Fixtures,
operational
equipment,
Assets
Right of use
Operational
land and
vehicles and
under
assets
Structures
buildings
other
construction
(Note 19)
Total
Group and Company
£m
£m
£m
£m
£m
£m
Cost or valuation
At 1 April 2023
5,471.7
38.6
206.0
149.7
7.3
5,873.3
Additions
185.9
1.2
19.2
70.9
2.6
279.8
Transfers
56.6
0.4
18.4
(75.4)
-
-
Disposals
(3.2)
-
(1.1)
-
(1.3)
(5.6)
At 31 March 2024
5,711.0
40.2
242.5
145.2
8.6
6,147.5
Additions
229.2
0.7
17.4
111.4
3.1
361.8
Transfers
58.3
0.3
3.2
(61.8)
-
-
Disposals
(5.9)
-
(2.3)
-
(2.0)
(10.2)
At 31 March 2025
5,992.6
41.2
260.8
194.8
9.7
6,499.1
Accumulated depreciation
At 1 April 2023
2,059.2
14.4
157.9
-
3.3
2,234.8
Charge for the year
114.0
1.2
15.5
-
1.8
132.5
Disposals
(3.2)
-
(1.1)
-
(1.3)
(5.6)
At 31 March 2024
2,170.0
15.6
172.3
-
3.8
2,361.7
Charge for the year
121.1
1.2
18.6
-
1.9
142.8
Disposals
(5.9)
-
(2.3)
-
(2.0)
(10.2)
At 31 March 2025
2,285.2
16.8
188.6
-
3.7
2,494.3
Net book value
At 31 March 2025
3,707.4
24.4
72.2
194.8
6.0
4,004.8
At 31 March 2024
3,541.0
24.6
70.2
145.2
4.8
3,785.8
At 31 March 2025, the Group and Company had entered into contractual commitments for the
acquisition of property, plant and equipment amounting to £75.8m (2024: £39.3m) (Note 33).
During the year, the Group and Company had cash outflow amounting to £355.4m (2024: £273.5m)
on additions to property, plant and equipment. Included in this figure are capitalised borrowing costs
of £2.1m (2024: £1.3m) (Note 9), determined using a capitalisation rate of 4.87% (2024: 4.13%).
At 31 March 2025, had the property, plant and equipment of the Group been carried at historical cost
less accumulated depreciation and accumulated impairment losses, the carrying amount would have
been £3,914.0m (2024: £3,692.6m). The revaluation reserve is disclosed in Note 28, net of deferred
tax. The revaluation reserve arose following a review after North West Water’s acquisition of Norweb,
in 1997.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
116
Notes to the Financial Statements (continued)
11. Property, plant and equipment (continued)
Impairment testing of intangible assets and property plant and equipment
During the year, the Group was acquired by Scottish Power Energy Networks Limited, part of the group
headed by Iberdrola, S.A., with an implied enterprise value significantly in excess of the carrying value
of the relevant assets. Given there have been no significant events or changes between the acquisition
date and year end date that suggest a material deterioration in the value of assets, it can be concluded
that there are no indications of impairment at 31 March 2025.
However, intangible assets with an indefinite useful life and goodwill acquired in a business
combination are required to be tested for impairment at least annually and whenever there is an
indication that the asset may be impaired. For the purposes of impairment testing the Group have
determined that there is only one cash generating unit (CGU), therefore we test annually for
impairment on all non-current assets.
An asset’s recoverable amount is the higher of fair value less costs of disposal and value in use. In
assessing the fair value less costs of disposal (FVLCD) the estimated future cash flows are discounted
to their present value using a discount rate that reflects current market assessments of the time value
of money and the risks specific to the asset for which the estimates of future cash flows have not been
adjusted. The discount rate is calculated at the year-end solely from external sources of information.
The carrying value of the CGU at 31 March 2025 was £3,240.9m (2024: £3,036.6m) including goodwill
of £10.1m (2024: £10.1m) excluding customer contributions of £817.0m (2024: £801.3m). The FVLCD
was calculated at £4,200.5m (2024: £4,568.8m). The key assumptions for the FVLCD calculations are
those regarding discount rates and the outcomes of future Ofgem price control settlements. The post-
tax discount rate for the year ended 31 March 2025 was 6.73% (2024: 6.00%).
It is considered appropriate to assess the cash flows over a 33-year period as this reflects the long-
term nature of the operation of the electricity distribution network and the importance of the
operations of the business in supporting the UK transition to net zero. The Group has prepared cash
flow forecasts for a 33-year period, including a terminal value, which represents the planning horizon
used for management purposes, being aligned to the end of a RIIO regulatory period. The terminal
value assumes a disposal of the assets for 1.56x Regulated Asset Value (RAV) at that point, and the
assumption of 1.56x is reflective of net proceeds on disposal.
Other than the mandated RIIO-ED2 requirements there is no real growth in expenditure is assumed in
projecting cash flows beyond the period covered by the most recent budgets/forecast, however, the
impact of inflation is included at 2% per annum, being the government’s long-term CPI inflation target
and in line with Ofgem methodology for costs and revenues.
In assessing the carrying value of the group’s tangible and intangible assets, we have sensitised our
forecasts to factor in changes to key assumptions, such as an increase in the discount rate of 0.5% and
removal of incentive income. No reasonably possible changes to inputs to the impairment test
performed were identified as resulting in an impairment.
Based on the impairment testing performed, management believe that sufficient headroom exists
between the FVLCD and the carrying value of the assets such that no impairment loss is required to
be booked.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
117
Notes to the Financial Statements (continued)
12. Leases
2025
2024
Group and Company
£m
£m
Right of use assets at net book value:
Land and buildings
3.1
2.0
Telecoms
0.1
0.1
Vehicles
2.8
2.7
Total (Note 11)
6.0
4.8
Lease liabilities:
Land and buildings
(2.7)
(1.9)
Telecoms
(0.1)
(0.1)
Vehicles
(2.9)
(2.9)
Total (Note 19)
(5.7)
(4.9)
The amount of short-term and low value leases expensed in the year was £0.7m (2024: £0.4m).
The Company’s leasing activities include land and buildings used for office space and substations,
telecoms fibre-optic cables for technical equipment communications, and vehicles for the use of
employees.
The lease payments are discounted using the interest rate implicit in the lease. If that rate cannot be
readily determined, the incremental borrowing rate is used. The lease liabilities have been discounted
at 5% (2024: 5%) for land and buildings, and telecoms; and at 6% (2024: 6%) for vehicles.
The following is an analysis of the maturity profile of the lease liabilities.
<1
1 – 2
2 – 3
3 – 4
>4
Total
year
years
years
years
years
Group and Company
£m
£m
£m
£m
£m
£m
At 31 March 2025
(2.0)
(1.3)
(0.7)
(0.4)
(1.3)
(5.7)
At 31 March 2024
(1.8)
(1.3)
(0.5)
(0.6)
(0.7)
(4.9)
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
118
Notes to the Financial Statements (continued)
13. Intangible assets and goodwill
Computer
Assets under
Goodwill
software
construction
Total
Group and Company
£m
£m
£m
£m
Cost:
At 1 April 2023
10.1
139.1
13.8
163.0
Additions
-
5.5
5.6
11.1
Transfers
-
10.3
(10.3)
-
At 31 March 2024
10.1
154.9
9.1
174.1
Additions
-
5.5
9.7
15.2
Transfers
-
7.3
(7.3)
-
Disposals
-
(70.6)
-
(70.6)
At 31 March 2025
10.1
97.1
11.5
118.7
Accumulated amortisation:
At 1 April 2023
-
107.8
-
107.8
Charge for the year
-
14.2
-
14.2
At 31 March 2024
-
122.0
-
122.0
Charge for the year
-
14.2
-
14.2
Disposals
-
(70.6)
-
(70.6)
At 31 March 2025
-
65.6
-
65.6
Net book value
At 31 March 2025
10.1
31.5
11.5
53.1
At 31 March 2024
10.1
32.9
9.1
52.1
In the Company, goodwill arose on the acquisition of assets and liabilities of Electricity North West
Number 1 Company Limited in the year ended 31 March 2011. This value reflects the excess of the
investment over the fair value of the trade and assets at the date of acquisition.
At 31 March 2025, the Group and Company had entered into contractual commitments for the
acquisition of software amounting to £9.6m (2024: £2.1m) (Note 33).
At each balance sheet date, the Group reviews the carrying amounts of its goodwill and intangible
assets to determine whether there is any indication that those assets have suffered an impairment
loss (Note 11).
Included in the net book value of computer software is £7.8m (2024: £12.9m) for an asset relating to
the network management system which has 2 years (2024: 3 years) of amortisation remaining.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
119
Notes to the Financial Statements (continued)
14. Investment in subsidiaries
2025
2024
Company
£m
£m
Cost and net book value
15.4
15.4
Investment in subsidiaries is stated at cost less any provisions for permanent diminution in value. Cost
of investment relates wholly to the shareholding in the Company’s direct subsidiary, Electricity North
West Number 1 Company Limited.
Details of the investments at 31 March 2024 and 2025, all of which were incorporated in the UK and
have a principal place of business in the UK, are as follows:
Proportion
Nature of
Company
Description of holding
held
business
Subsidiary undertakings
Electricity North West Number 1
Ordinary shares of £1 each
100%
Dormant
Company Limited
ENW
(ESPS)
Pensions
Trustees
Ordinary shares of £1 each
100%
Dormant
Limited
There have been no changes to these shareholdings during the year. The address of the registered
office of the investments above is Borron Street, Stockport, Cheshire, SK1 2JD.
15. Inventories
2025
2024
Group and Company
£m
£m
Raw material and consumables
56.7
49.3
The cost of inventories recognised as an expense in the year was £2.9m (2024: £3.4m). Write-downs
of inventories to net realisable value amounted to £0.3m (2024: £0.1m).
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
120
Notes to the Financial Statements (continued)
16. Trade and other receivables
2025
2024
Group and Company
£m
£m
Trade receivables
7.5
12.7
Amounts owed by group undertakings (Note 32)
7.4
5.8
Accrued income
65.1
61.3
Financial assets (Note 21)
80.0
79.8
Prepayments
20.9
22.7
Non-financial assets
20.9
22.7
Total trade and other receivables
100.9
102.5
The average credit period taken on trade receivables is 14 days (2024: 14 days). At 31 March 2025,
£4.5m (2024: £6.5m) of the trade receivables were past due, with £2.8m over 30 days past due (2024:
£4.7m).
Trade receivables and inter-company receivables do not accrue interest and are stated net of expected
credit losses (ECL). The recoverability of these assets is assessed using the simplified approach under
IFRS 9, based on lifetime ECL, with reference to known specific circumstances, past default experience
and an assessment of the current economic environment.
The table below shows the movement on the ECL:
2025
2024
Group and Company
£m
£m
At 1 April
0.8
4.1
Amounts written off in the year
(0.1)
(3.3)
At 31 March
0.7
0.8
Credit risk in relation to trade receivables is considered to be relatively low, with each customer being
contractually required to provide collateral in the form of a cash deposit, subject to the amounts due
and their credit rating. As at 31 March 2025, £2.7m (2024: £2.9m) of cash had been received as
security (see Note 18).
Under the terms of the contract, the maximum unsecured credit that the Group may be required to
give per customer is 2% of the Regulatory Asset Value (RAV) of the Company. The RAV is calculated
in accordance with Ofgem methodology. At 31 March 2025, the RAV was £2,873.9m (2024:
£2,684.6m) and has been indexed using the CPIH for March 2025. At 31 March 2025, £460.3m (2024:
£366.2m) of unsecured credit limits had been granted to customers and the highest unsecured credit
limit given to any single customer was £10.2m (2024: £9.6m). All customers granted the maximum
amount of unsecured cover must have a credit rating of at least BBB+ from Standard and Poor’s and
Baa1 from Moody’s Investor Services, or a guarantee from a parent company of an equivalent rating.
Alternatively, the customer must be able to prove their creditworthiness on an ongoing basis.
Whilst the loss of a principal customer could have a significant impact on the Group, the exposure to
such credit losses is mitigated by the protection Ofgem provides to cover such losses. Nonetheless,
credit management processes are in place and the credit worthiness of each customer is closely
monitored.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
121
Notes to the Financial Statements (continued)
17. Cash and cash equivalents
2025
2024
Group and Company
£m
£m
Cash in bank accounts
9.1
20.0
Cash in liquidity funds
123.0
120.4
Cash in short-term money market deposits under 3 months
-
49.4
Total cash and cash equivalents (Note 21, 22 & 34)
132.1
189.8
Weighted average interest rate
4.51%
5.33%
Weighted average term
8.5 days
23.9 days
Cash and cash equivalents comprise cash at bank, deposits and other short-term highly liquid
investments which are readily convertible into known amounts of cash and have an original maturity
of three months or less, net of any bank overdrafts which are payable on demand. At 31 March 2025,
there was no formal bank overdraft facility in place (2024: same).
18. Trade and other payables
Group
Company
Group
Company
2025
2025
2024
2024
£m
£m
£m
£m
Trade payables (Note 22)
18.8
18.8
18.4
18.4
Amounts owed to group undertakings (Note 32)
13.4
13.4
13.5
13.5
Amounts owed to subsidiary undertaking (Note 32)
-
15.5
-
15.5
Accruals
76.7
76.9
76.5
76.7
Refundable customer deposits (Note 22)
2.7
2.7
2.9
2.9
Cash collateral (Note 20)
31.8
31.8
12.0
12.0
Financial liabilities (Note 21)
143.4
159.1
123.3
139.0
Contract liabilities
20.1
20.1
10.0
10.0
Other taxation and social security
9.8
9.8
15.2
15.2
Deferred income
14.0
14.0
15.0
15.0
Non-financial liabilities:
43.9
43.9
40.2
40.2
Total trade and other payables
187.3
203.0
163.5
179.2
Trade payables and accruals principally comprise amounts outstanding for capital purchases and
ongoing costs. The average credit period in the year was 22.9 days from receipt of invoice (2024: 21.4
days). The directors consider that the carrying amount of trade and other payables approximates to
their fair value.
Refundable customer deposits are cash deposits held as a security in relation to distribution of
electricity customers.
Contract liabilities have increased due to the acceptance of high value projects. Of the revenue
recognised in the year, £3.9m (2024: £2.3m) was included in the contract liability at the beginning of
the year (Note 4).
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
122
Notes to the Financial Statements (continued)
19. Borrowings
This note provides information about the contractual terms of the Group’s borrowings. For more
information about the Group’s financial risk management and exposure to credit risk, liquidity risk and
market risk see Note 22.
The carrying values by category of borrowing were as follows:
2025
2024
Group and Company
£m
£m
Current liabilities:
Bonds (Note 21)
456.4
-
Bank and other term borrowings (Note 22)
9.4
9.1
Lease liabilities (Note 12)
2.0
1.8
467.8
10.9
Non-current liabilities:
Bonds (Note 22)
201.2
656.9
Bank and other term borrowings (Note 22)
59.7
67.4
Lease liabilities (Note 12)
3.7
3.1
Amounts owed to parent undertaking (Note 22 & 32)
111.1
109.8
Amounts owed to group undertaking (Note 22 & 32)
722.3
721.9
1,098.0
1,559.1
Borrowings (Note 21 & 34)
1,565.8
1,570.0
The carrying values and key terms by instrument were as follows:
2025
2024
Nominal
Interest
Maturity
Carrying
Carrying
value
rate
value
value
Group and Company
£m
year
£m
£m
Bond
200.0
8.875%
2026
199.5
199.0
Bond
250.0
8.875%
2026
256.9
263.6
Index-linked bond
100.0
1.4746%+RPI
2046
201.2
194.3
Index-linked loan
50.0
0.38% +RPI
2032
32.9
36.2
Index-linked loan
50.0
0%+RPI
2033
37.1
40.3
Revolving credit facility
250.0
Sonia+0.50%
2027
(0.9)
-
Lease liabilities (Note 12)
-
-
-
5.7
4.9
Amounts owed to parent undertaking
175.0
4.11%
2028
111.1
109.8
Amounts owed to group undertaking
300.0
1.415%
2030
299.1
299.0
Amounts owed to group undertaking
425.0
4.893%
2032
423.2
422.9
Borrowings (Note 21 & 34)
1,565.8
1,570.0
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
123
Notes to the Financial Statements (continued)
19. Borrowings (continued)
At 31 March 2024 and 2025, all borrowings were unsecured and in sterling, and there were no formal
bank overdraft facilities in place. All borrowings were measured at amortised cost. See Note 21 for
more information on the fair value of the Group’s borrowings.
The Group has complied with all financial covenants under its financing agreements during the current
and prior year.
The following table provides a reconciliation of the opening and closing borrowings amounts. Where
applicable, interest on these amounts is included in accruals within trade and other payables on the
balance sheet and is, therefore, excluded from this table.
2025
2024
Group and Company
£m
£m
At 1 April
1,570.0
1,763.1
Repayments of external borrowings
(9.3)
(232.9)
Lease liabilities capital repayment
(1.9)
(1.8)
Lease liabilities interest repayment
(0.3)
(0.3)
Lease liabilities interest charged (Note 9)
0.3
0.3
New lease liabilities (Note 34)
2.7
2.6
Increase in loan from parent
1.3
13.3
Indexation (Note 9 & 34)
9.6
31.0
Transaction costs on new external borrowings (Note 34)
(1.3)
(0.1)
Amortisation of transaction costs, bond discounts and premiums
(5.3)
(5.2)
(Note 34)
At 31 March (Note 21 & 34)
1,565.8
1,570.0
The Group’s committed undrawn borrowing facilities were as follows:
2025
2024
Group and Company
£m
£m
£50m revolving credit facility – expiry December 2024
-
50.0
£250m revolving credit facility – expiry April 2027
250.0
-
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
124
Notes to the Financial Statements (continued)
20. Derivatives
This note provides information about the derivative financial instruments held by the Group, including
information on the methods and assumptions used in determining the fair value of these instruments.
The Board has authorised the use of derivatives by the Group to reduce the risk of loss arising from
changes in market risks, and for economic hedging reasons. Derivatives are used to hedge interest
rate risk and to change the basis of interest cash flows from fixed to either an alternative fixed profile,
or to an RPI inflation-linked basis to match the inflation-linked revenue profile (noting that Ofgem
have now changed this to a CPIH basis). The Board approves all new derivatives. The Group does not
use derivatives for speculative purposes. The accounting policy for derivatives is provided in Note 2
and more information on market risk is included in Note 22.
At 31 March 2024 and 2025, the Group and Company’s derivatives are not designated in formal hedge
accounting relationships and are measured at fair value through profit or loss (FVTPL).
The Group has the following derivatives in the following line items in the statement of financial
position:
2025
2024
Group and Company
£m
£m
Non-current assets:
Inter-company derivative asset
192.2
217.1
Inflation-linked swaps
43.8
28.5
Derivative assets (Note 21)
236.0
245.6
Non-current liabilities:
Inter-company derivative liability
(192.2)
(217.1)
Inflation-linked swaps
(286.7)
(310.9)
Interest rate swaps – fixed to floating
(39.4)
(41.5)
Derivative liabilities (Note 21)
(518.3)
(569.5)
The table below summarises the key terms of the various external derivatives held by the Group at 31
March 2025; each category includes multiple instruments and the rates stated are the aggregate rate
for that category. The table excludes the inter-company derivative asset and the inter-company
derivative liability as the cash flows on these instruments net to £nil.
Notional
Number
Type
Maturity
Pay Leg
Receive Leg
Accretion
£200m
14
Index-linked
2038
3.56%+RPI,
6m Sonia,
5-yearly,
semi-annual
semi-annual
next due July 2027
7-yearly,
next due July 2030
£100m
1
4
Index-linked
2050
1.51%+RPI,
8.875%,
10-yearly,
semi-annual
annual
next due Sept 2030
£200m
1
Fix/ float
2030
6m Sonia,
0.283%,
None
semi-annual
Semi-annual
1
8.875% up to and including the 26 March 2026 payment date, then changes to 6m Sonia for the
remaining term of the instruments.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
125
Notes to the Financial Statements (continued)
20. Derivatives (continued)
In the Group and Company, no new derivatives were entered during the year, neither were any
derivatives closed out during the year.
The inter-company derivative asset and inter-company derivative liability are held by the Company,
with ENW Finance plc as counterparty. The first is a back-to-back swap, mirroring in aggregate the
terms of the £200m 2038 notional external index-linked swaps noted above. The second is a mirror
of that back-to-back swap, the terms of which are defined in an inter-company loan agreement
between the two entities, creating an embedded derivative that is bifurcated from the host contract
and recorded as a separate instrument in the Company. The cash flows and fair value of these two
instruments net to £nil in the Company.
Whilst all derivatives are net-settled, no balances meet the offsetting criteria in IAS 32 paragraph 42
and all are, therefore, shown gross.
The Company has two one-way credit support annexes (CSAs) in place that define the terms for the
provision of cash collateral by the counterparty; under the CSAs, no cash collateral is required to be
provided by the Company. At 31 March 2025, £31.8m (2024: £12.0m) cash collateral was held under
these CSAs (Note 18). The cash collateral does not meet the offsetting criteria in IAS 32 paragraph 42,
but it would be set off against the net amount of the derivatives in the case of default and insolvency
or bankruptcy, in accordance with the CSAs.
The following table presents the recognised financial instruments that are subject to the CSAs but not
offset in the financial statements. The ‘net amount’ shows the amount in the Company’s statement
of financial position if all set-off rights were exercised.
Amounts
subject to
Financial
Gross
master netting
instrument
amount
arrangements
collateral
Net amount
Group and Company
£m
£m
£m
£m
At 31 March 2025:
Inter-company derivative asset
192.2
(192.2)
-
-
Inter-company derivative liability
(192.2)
192.2
-
-
Derivative assets
43.8
(12.0)
(31.8)
-
Derivative liabilities
(326.1)
12.0
-
(314.1)
(282.3)
-
(31.8)
(314.1)
Other collateral not included above
-
-
-
-
Total
(282.3)
-
(31.8)
(314.1)
At 31 March 2024:
Inter-company derivative asset
217.1
(217.1)
-
-
Inter-company derivative liability
(217.1)
217.1
-
-
Derivative assets
28.5
(19.6)
(8.9)
-
Derivative liabilities
(352.4)
19.6
-
(332.8)
(323.9)
-
(8.9)
(332.8)
Other collateral not included above
-
-
(3.1)
(3.1)
Total
(323.9)
-
(12.0)
(335.9)
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
126
Notes to the Financial Statements (continued)
20. Derivatives (continued)
Recognised fair value measurements
All of the financial instruments recognised at fair value in the statement of financial position are
derivatives; these are measured at fair value through profit or loss and those fair value measurements
occur on a recurring basis.
Fair value hierarchy
Financial instruments that are recognised in the statement of financial position at fair value are
classified into three levels, as prescribed under accounting standards, based on the degree to which
the inputs used in determining the fair value are observable:
• Level 1: includes financial instruments traded in an active market and the fair value is derived
from quoted market prices (unadjusted);
• Level 2: includes financial instruments not traded in an active market and the fair value is
determined using valuation techniques that maximise the use of observable market data and
rely as little as possible on entity-specific estimates. If all significant inputs are observable,
the financial instrument is included in level 2; and
• Level 3: if one or more significant inputs is not based on observable market data, the financial
instrument is included in level 3. This is the case for the majority of derivatives held by the
Group.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
127
Notes to the Financial Statements (continued)
20. Derivatives (continued)
The following table presents the Group’s financial instruments that are measured and recognised at
fair value, grouped into the three levels outlined above to provide an indication as to the reliability of
the inputs used in determining the fair value. Each category includes multiple instruments.
Level 1
Level 2
Level 3
Total
Group and Company
£m
£m
£m
£m
At 31 March 2025
Derivative assets:
Inter-company derivative asset
-
-
192.2
192.2
Inflation-linked swaps
-
31.2
12.6
43.8
-
31.2
204.8
236.0
Derivative liabilities:
Inter-company derivative liability
-
-
(192.2)
(192.2)
Inflation-linked swaps
-
-
(286.7)
(286.7)
Interest rate swaps – fixed to floating
-
(39.4)
-
(39.4)
-
(39.4)
(478.9)
(518.3)
Total
-
(8.2)
(274.1)
(282.3)
At 31 March 2024
Derivative assets:
Inter-company derivative asset
-
-
217.1
217.1
Inflation-linked swaps
-
20.9
7.6
28.5
-
20.9
224.7
245.6
Derivative liabilities:
Inter-company derivative liability
-
-
(217.1)
(217.1)
Inflation-linked swaps
-
-
(310.9)
(310.9)
Interest rate swaps – fixed to floating
-
(41.5)
-
(41.5)
-
(41.5)
(528.0)
(569.5)
Total
-
(20.6)
(303.3)
(323.9)
There were no transfers between levels 1 and 2 during the current or prior year. For transfers into
and out of level 3, see overleaf.
Any transfers between levels are deemed to have occurred at the beginning of the reporting period.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
128
Notes to the Financial Statements (continued)
20. Derivatives (continued)
The following table provides a reconciliation of the fair value amounts disclosed as Level 3.
2025
2024
Group and Company
£m
£m
At 1 April
(303.3)
(368.1)
Transfers into Level 3 from Level 2
-
(15.9)
Transfers from Level 3 into Level 2
3.2
(11.6)
Total gains in profit or loss:
- On transfers into Level 3 from Level 2
-
9.5
- On instruments carried forward in Level 3
26.0
82.8
At 31 March
(274.1)
(303.3)
The transfers were principally due to a change in the significance of the unobservable inputs used to
derive the Group’s credit curve for the bilateral credit valuation adjustment (BCVA), as described in
the section below.
The following table shows the sensitivity of the fair value of derivatives to the Level 3 inputs,
determined by applying a 10bps shift to the own credit curve used to calculate the BCVA. These
sensitivities have been performed on a portfolio basis to incorporate the effect of the CSAs (see
above).
2025
2025
2024
2024
-10bps
+10bps
-10bps
+10bps
Group and Company
£m
£m
£m
£m
Impact on derivative portfolio
(3.0)
2.9
(3.7)
3.5
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
129
Notes to the Financial Statements (continued)
20. Derivatives (continued)
Valuation techniques used to determine fair value
Where available, quoted market prices have been used to determine fair values (Level 1 inputs).
Where not available, fair values have been calculated by discounting estimated future cash flows
based on observable interest and RPI curves sourced from market available data (Level 2 inputs). In
accordance with IFRS 13, an adjustment for non-performance risk (XVA) has then been made to give
the fair value.
The XVA has been quantified by calculating a bilateral credit valuation adjustment (BCVA) based on
both the credit risk profile of the counterparty and the credit risk profile of the relevant group entity,
using market-available data where possible, and stochastic modelling.
Whilst the inputs to the BCVA calculations in relation to the counterparty credit risk meet the criteria
for Level 2 inputs, the inputs regarding the Group’s own credit risk are deemed to be Level 3 inputs,
as there are no observable credit related inputs for the Group at commonly quoted intervals or
otherwise interpolated for substantially the full term of the instruments. The credit risk profile of the
Group has been based on a UK utility credit curve provided by a third-party data provider. It is this
assumption that is deemed to be Level 3.
For certain derivatives, the Level 3 inputs form an insignificant part of the fair value and, therefore,
these derivatives are disclosed as Level 2. Otherwise, the derivatives are disclosed as Level 3.
At 31 March 2025, in the statement of financial position, the net adjustment for non-performance risk
was a £64.0m debit (2024: £74.9m debit), of which £64.7m debit (2024: £73.5m debit) was classed as
Level 3, and £0.7m credit (2024: £1.4m debit) was classed as Level 2.
On entering certain derivatives, the valuation technique used resulted in a fair value loss. As this was
neither evidenced by a quoted price nor based on a valuation technique using only data from
observable markets, this loss on initial recognition was not recognised. This was supported by the
transaction price of £nil. This difference is being recognised in profit or loss on a straight-line basis
over the life of the derivatives. At 31 March 2025, the aggregate difference yet to be recognised was
£42.6m (2024: £45.0m). The movement in the year all relates to the straight-line release to profit or
loss.
The following table provides an analysis of the component parts of the fair value of the derivative
assets and derivative liabilities.
2025
2024
Group and Company
£m
£m
Fair value of derivatives pre IFRS 13 adjustment
321.8
302.6
XVA adjustment
(34.7)
(40.0)
Day 1 adjustment
(51.1)
(17.0)
Derivative assets (Note 21)
236.0
245.6
Fair value of derivatives pre IFRS 13 adjustment
(710.7)
(746.4)
XVA adjustment
98.7
114.9
Day 1 adjustment
93.7
62.0
Derivative liabilities (Note 21)
(518.3)
(569.5)
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
130
Notes to the Financial Statements (continued)
21. Financial instruments
This note provides an overview of the financial instruments held by the Group, with references to
other notes that include more specific information about each type of financial instrument.
The Group holds the following categories of financial instruments:
Group
Company
Group
Company
2025
2025
2024
2024
£m
£m
£m
£m
Financial assets:
Derivative assets (Note 20)
236.0
236.0
245.6
245.6
Trade and other receivables (Note 16)
80.0
80.0
79.8
79.8
Cash and cash equivalents (Note 17)
132.1
132.1
189.8
189.8
448.1
448.1
515.2
515.2
Financial liabilities:
Trade and other payables (Note 18)
(143.4)
(159.1)
(123.3)
(139.0)
Borrowings (Note 19)
(1,565.8)
(1,565.8)
(1,570.0)
(1,570.0)
Derivative liabilities (Note 20)
(518.3)
(518.3)
(569.5)
(569.5)
(2,227.5)
(2,243.2)
(2,262.8)
(2,278.5)
The Group’s exposure to various risks associated with the financial instruments is outlined in Note 22.
The maximum exposure to credit risk at the end of the reporting period is the carrying amount of each
class of financial assets in the table above.
Fair value of financial instruments
All financial instruments are held at amortised cost, except derivatives that are at fair value through
profit or loss. Information about the methods and assumptions used in determining the fair value of
derivatives is included in Note 20.
The Group has a number of financial instruments which are not measured at fair value in the
statement of financial position. For the majority of these instruments, the fair values are not
materially different to their carrying values, since the interest receivable/payable is either close to
current market rates or the instruments are short-term in nature, such as cash and cash equivalents,
money market deposits, trade and other receivables, and trade and other payables.
The instruments for which significant differences were identified, in either the current or prior periods,
are presented in the following table.
2025
2025
2024
2024
Carrying
Fair
Carrying
Fair
value
value
value
value
Group and Company
£m
£m
£m
£m
Financial liabilities:
Bonds
1
(Note 19)
(657.6)
(623.6)
(656.9)
(650.9)
Bank and other term borrowings
2
(Note 19)
(69.1)
(65.9)
(76.5)
(74.8)
Amounts owed to group undertaking
1
(Note 19)
(722.3)
(672.5)
(721.9)
(685.8)
1
These fair value are derived from quoted market prices and, therefore, meet the Level 1 criteria.
2
These fair value are based on discounted cash flows using a current borrowing rate. They are classified as
Level 3 due to the use of unobservable inputs, including own credit risk.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
131
Notes to the Financial Statements (continued)
22. Financial risk management
This note explains the Group’s exposure to financial risks and how these risks could affect the Group’s
future financial performance. Current year profit and loss information has been included where
relevant to add further context.
The principal financial risks to which the Group is exposed and which arise in the normal course of
business include market risk, in particular interest rate risk and inflation risk, credit risk and liquidity
risk.
The Group has a formal risk management structure, designed to identify and analyse risks. There are
financial risk management policies and controls in place, including the use of risk limits, mandates,
and monitoring and reporting requirements, supported by reliable and up-to-date systems. The risk
management policies and systems are reviewed annually and amended to reflect changes in market
conditions and the associated levels of risk, as appropriate. The processes for managing risk and the
methods used to measure risk have not changed since the prior year.
It is the responsibility of the Board to set, approve and review the risk management policies,
procedures and controls. The Audit and Compliance Committee is responsible for independently
overseeing the financial risk management activities of the Group. The Group treasury function, which
is authorised to conduct the day-to-day treasury activities of the Group, reports on a regular basis to
the Audit and Compliance Committee.
Market risk
Market risk is the risk that future cash flows of a financial instrument, or the fair value of a financial
instrument, will fluctuate because of changes in market prices. Market prices include foreign
exchange rates, interest rates, inflation, equity and commodity prices. The main types of market risk
to which the Group is exposed are interest rate risk and inflation risk; the Group has no significant
foreign exchange, equity or commodity exposure.
The Board has authorised the use of derivative financial instruments to reduce the risk of loss arising
from changes in market risks, and for economic hedging reasons. Derivatives are used to hedge
interest rate risk and to change the basis of interest cash flows from fixed to either an alternative fixed
profile, or to an RPI inflation-linked basis to match the inflation-linked revenue profile (noting that
Ofgem have now changed this to a CPIH basis). The Board approves all new derivatives. The Group
and Company do not use derivatives for speculative purposes. More information on the derivatives
held by the Group is provided in Note 20.
Interest rate risk
The Group’s floating rate borrowings (see Note 19) and derivatives (see Note 20) are exposed to a risk
of change in cash flows due to changes in interest rates. The Group’s derivatives are exposed to a risk
of change in their fair value due to changes in interest rates. Investments in short-term receivables
and payables are not exposed to interest rate risk due to their short-term nature.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
132
Notes to the Financial Statements (continued)
22. Financial risk management (continued)
Sensitivity analysis on interest
Although the following analysis provides an indication of the Group’s exposure to interest rate risk,
such analysis is limited due to the long-term nature of many of the financial instruments and the
uncertainty over future market rates.
The sensitivity figures are calculated based on a downward parallel shift across the interest rate curve
of 0.5% and upward parallel shifts of 0.5% and 1%, a range in outcomes that management deem
reasonably possible within the next financial year.
At 31 March 2025, the only floating rate debt facility was the revolving credit facility, which was nil
drawn (2024: same), so there was no related interest charge in the income statement. The impact on
the cash flows of the derivatives is excluded from this analysis, as there would be an equal and
opposite effect on the fair value movement, resulting a net £nil impact in the income statement.
The following table shows the amount by which the fair value of items recorded on the statement of
financial position at fair value would be adjusted for a given interest rate movement. As fair value
movements are taken to the income statement, there would be a corresponding adjustment to
finance costs; figures in brackets represent a reduction to profit.
2025
2025
2025
2024
2024
2024
-0.5%
+0.5%
+1%
-0.5%
+0.5%
+1%
Group and Company
£m
£m
£m
£m
£m
£m
Fair values:
Inter-company derivative asset
19.9
(18.7)
(36.4)
23.4
(21.8)
(43.6)
Inter-company derivative liability
(19.9)
18.7
36.4
(23.4)
21.8
43.6
Inflation-linked swaps
(34.7)
32.2
61.9
(44.7)
34.3
68.5
Interest rate swaps
4.2
(4.1)
(8.0)
6.4
(3.2)
(6.4)
Total finance costs impact
(30.5)
28.1
53.9
(38.3)
31.1
62.1
Inflation risk
The Group’s inflation-linked borrowings (see Note 19) and inflation-linked derivatives (see Note 20)
are exposed to a risk of change in cash flows due to changes in inflation rates. The Group’s index-
linked derivatives are exposed to a risk of change in their fair value due to changes in inflation rates.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
133
Notes to the Financial Statements (continued)
22. Financial risk management (continued)
Sensitivity analysis on inflation
Although the following analysis provides an indication of the Group’s exposure to inflation risk, such
analysis is limited due to the long-term nature of many of the financial instruments and the
uncertainty over future market rates.
The sensitivity figures are calculated based on a downward parallel shift across the inflation curve of
0.5% and upward parallel shifts of 0.5% and 1%, a range in outcomes that management deem
reasonably possible within the next financial year.
The following table shows the amount by which the finance costs in the income statement would have
differed if inflation rates over the course of the year had differed from the actual rates; figures in
brackets represent a reduction to profit. The change in indexation would have a corresponding impact
on the carrying value of the inflation-linked debt in the statement of financial position. The impact on
the cash flows of the derivatives is excluded from this analysis, as there would be an equal and
opposite effect on the fair value movement, resulting a net £nil impact in the income statement.
2025
2025
2025
2024
2024
2024
-0.5%
+0.5%
+1%
-0.5%
+0.5%
+1%
Group and Company
£m
£m
£m
£m
£m
£m
Interest:
Inflation-linked borrowings
-
-
-
-
-
(0.1)
Indexation:
Inflation-linked borrowings
1.4
(1.4)
(2.7)
1.4
(1.4)
(2.7)
Total finance costs impact
1.4
(1.4)
(2.7)
1.4
(1.4)
(2.8)
The following table shows the amount by which the fair value of items recorded in the statement of
financial position at fair value would be adjusted for a given inflation rate movement. As fair value
movements are taken to the income statement, there would be a corresponding adjustment to
finance costs; figures in brackets represent a reduction to profit.
2025
2025
2025
2024
2024
2024
-0.5%
+0.5%
+1%
-0.5%
+0.5%
+1%
Group and Company
£m
£m
£m
£m
£m
£m
Fair values:
Inter-company derivative asset
(29.0)
30.5
62.7
(33.2)
35.0
69.9
Inter-company derivative liability
29.0
(30.5)
(62.7)
33.2
(35.0)
(69.9)
Inflation-linked swaps
49.3
(52.9)
(109.8)
54.4
(65.1)
(130.1)
Total finance costs impact
49.3
(52.9)
(109.8)
54.4
(65.1)
(130.1)
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
134
Notes to the Financial Statements (continued)
22. Financial risk management (continued)
Credit risk
The Group is exposed to credit risk, which is the risk that financial loss arises from the failure of a
customer or counterparty to meet its obligations under a contract as they fall due. Credit risk arises
principally from cash and cash equivalents, money market deposits, derivative assets, and trade and
other receivables.
The maximum exposure to credit risk at the end of the reporting period is the carrying amount of each
class of financial assets, as shown in the table in Note 21.
The Group is potentially exposed to significant credit risk in relation to cash and cash equivalents,
money market deposits and derivative assets. For these counterparties, minimum credit ratings are
specified, and individual exposure limits are in place to reduce the concentration of risk and exposure
to any one counterparty. Management does not anticipate any of these counterparties will fail to
meet its obligations. At 31 March 2025, none (2024: none) of the Group’s treasury balances were
either past due or impaired, and no terms had been re-negotiated with any counterparty.
The table below shows an analysis of the ratings of the counterparties with which the Group holds
cash and cash equivalents (excluding the impact of unpresented items), money market deposits and
derivative assets.
2025
2025
2024
2024
Group and Company
£m
%
£m
%
AAA
91.2
51.5
90.3
41.1
A+
43.8
24.8
49.6
22.6
A
42.0
23.7
79.6
36.3
177.0
100.0
219.5
100.0
For more information on the credit risk and expected credit losses in relation to trade and other
receivables, see Note 16.
Liquidity risk
Liquidity risk is the risk that the Group will have insufficient funds to meet its financial obligations as
they fall due. The Group manages the maturity profile of its assets, liabilities and commitments so
that cash flows are appropriately balanced and all funding obligations are able to be met when due.
This is achieved through maintaining a prudent level of liquid assets and arranging funding facilities
well in advance of need. The Group uses derivatives to economically hedge certain cash flows (see
Note 20).
The Board is responsible for monitoring the maturity of liquidity and deposit funding balances and
taking any action as appropriate. A long-term view of liquidity is provided by Group financial models
which project cash flows out 33 years ahead, to the end of the Regulatory Period ending 31 March
2058. A medium-term view is provided by the Group business plan covering the period ending 31
March 2028, which is updated and approved annually by the Board. The Board has approved a
liquidity framework within which the business operates, including the maintenance of a minimum of
12 months liquidity.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
135
Notes to the Financial Statements (continued)
22. Financial risk management (continued)
The Group had access to the following liquid assets and undrawn borrowing facilities at 31 March:
2025
2024
Group and Company
£m
£m
Cash and cash equivalents (Note 17)
132.1
189.8
Committed undrawn borrowing facilities (Note 19)
250.0
50.0
382.1
239.8
The Group considers the timing of scheduled payments to avoid risks associated with the
concentration of large cash flows within particular time periods.
The table below shows the maturity profile of the contractual cash flows due under the Group’s
financial liabilities, on an undiscounted basis, estimated using prevailing interest and inflation rates at
the reporting date. Derivative cash flows include those on both derivative assets and derivative
liabilities and have been shown net; all other cash flows are shown gross.
<1 year
1 – 2
2 – 3
3 – 4
>4 years
Total
years
years
years
Group and Company
£m
£m
£m
£m
£m
£m
At 31 March 2025:
Trade payables
(18.8)
-
-
-
-
(18.8)
Refundable customer deposits
(2.7)
-
-
-
-
(2.7)
Leases
(2.0)
(1.3)
(0.7)
(0.4)
(1.4)
(5.8)
Amounts
owed
to
parent
(4.6)
(4.6)
(116.9)
-
-
(126.1)
undertaking
Amounts owed to group companies
(25.0)
(25.0)
(25.0)
(25.0)
(816.7)
(916.7)
Bonds
(493.0)
(3.0)
(3.0)
(3.0)
(257.4)
(759.4)
Borrowings and overdrafts
(9.5)
(9.5)
(9.5)
(9.5)
(33.0)
(71.0)
Derivatives
(6.1)
(10.2)
(35.1)
(10.2)
(392.2)
(453.8)
Total contractual cash flows
(561.7)
(53.6)
(190.2)
(48.1)
(1,500.7)
(2,354.3)
At 31 March 2024:
Trade payables
(18.4)
-
-
-
-
(18.4)
Refundable customer deposits
(2.9)
-
-
-
-
(2.9)
Leases
(1.8)
(1.3)
(0.5)
(0.6)
(0.7)
(4.9)
Amounts
owed
to
parent
(4.5)
(4.5)
(4.5)
(115.5)
-
(129.0)
undertaking
Amounts owed to group companies
(25.0)
(25.0)
(25.0)
(25.0)
(841.7)
(941.7)
Bonds
(42.9)
(492.9)
(2.9)
(2.9)
(251.8)
(793.4)
Borrowings and overdrafts
(9.2)
(9.2)
(9.2)
(9.2)
(41.0)
(77.8)
Derivatives
(5.6)
(5.6)
(8.9)
(32.1)
(350.5)
(402.7)
Total contractual cash flows
(110.3)
(538.5)
(51.0)
(185.3)
(1,485.7)
(2,370.8)
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
136
Notes to the Financial Statements (continued)
23. Retirement benefit schemes
Group and Company
Nature of Scheme
The Group’s retirement benefit arrangement is the Electricity North West Group of the Electricity
Supply Pension Scheme (“ESPS” or “the Scheme”) and forms part of the ESPS. The Scheme contains
both a defined benefit section and a defined contribution section. The defined benefit section of the
Scheme closed to new entrants on 1 September 2006, with new employees of the Group subsequently
provided with access to the defined contribution section.
The defined benefit section is a UK funded final salary arrangement providing pensions and lump sums
to members and dependants. The defined benefit section is a separate fund that is legally separated
from the entity. The Trustee board of the Scheme is composed of representatives from both the
employer and members of the Scheme. Under the Pensions Act 2004 at least one third of the Trustee
Board must be member nominated and the Trustee Board has made the necessary arrangements to
fulfil this obligation. The Trustee Board of the Scheme is required by law to act in the interest of the
Scheme and all relevant stakeholders of the Scheme, i.e., active employees, retirees and employers.
The Trustee Board is responsible for the operation, funding and investment strategy of the Scheme.
During the year the Group made contributions of £9.8m (2024: £10.0m) to the defined benefit section
of the Scheme. This includes £nil (2024: £nil) of deficit contribution. The Group estimates that
contributions for the year ending 31 March 2026 will amount to around £9.8m. The total defined
benefit pension expense for the year was £6.8m (2024: £6.8m). No Executive directors were part of
the defined benefit scheme.
As at 31 March 2025 contributions of £1.0m (2024: £1.0m) relating to the current year had not been
paid over to the defined benefit Scheme.
Defined benefit assets are measured at fair value while liabilities are measured at present value. The
difference between the two amounts is recognised as a surplus or obligation in the Statement of
Financial Position.
UK legislation requires the Trustee Board to carry out valuations at least every three years and to
target full funding against a basis that prudently reflects the Scheme’s risk exposure. The most recent
triennial funding valuation of the scheme was carried out as at 31 March 2022 and identified a shortfall
of £19.4m against the Trustee Board’s statutory funding objective. A subsequent triennial valuation
as at 31 March 2025 is currently underway; however, the process remains at an early stage, and
preliminary results are not anticipated until the second half of 2025. In addition to the timing of the
two valuations, the contributions made in the period and the return on assets, the main difference is
due to the different assumptions used by the IAS 19 Employee Benefits (revised 2011) and the funding
valuation. In the event of underfunding, the Group must agree a deficit recovery plan with the Trustee
Board within statutory deadlines. As part of the 2023 actuarial valuation, the Group agreed to
eliminate the shortfall by paying additional annual contributions in the period to 31 March 2024; no
further additional contributions are required after 31 March 2024 until at least the next triennial
valuation. The next valuation, as at 31 March 2025, is currently underway and remains at an early
stage.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
137
Notes to the Financial Statements (continued)
23. Retirement benefit schemes (continued)
Funding the liabilities
The current and prior year defined benefit obligation has been calculated based on the results of the
31 March 2022 triennial funding valuation. The results of the 2022 funding valuation have been
projected forward by an independent actuary to take account of the requirements of revised IAS 19
in order to assess the position as at 31 March 2025 for the purpose of these financial statements. The
present value of the defined benefit obligation, the related current service cost and the past service
cost were measured using the projected unit credit method. A pension surplus under IAS 19 of £56.1m
is included in the statement of financial position at 31 March 2025 (2024: surplus of £39.0m).
The duration of the Scheme based on the results of the 31 March 2022 triennial funding valuation is
approximately 16 years (2024: 16 years). As at the current reporting date the Scheme actuary
estimates that the duration based on the 31 March 2022 triennial has since fallen to approximately
12 years (2024: 13 years) this has been used in the calculations as at 31 March 2025.
Investment risks
The Scheme has an investment strategy to aim to match pensioner and other liabilities with lower risk
cash flow investments and to invest liabilities in respect of active members into return seeking assets.
As active members retire, then a switch of investments would be carried out.
The Company recognises that the interests of customers, who ultimately fund pension costs, should
be given full recognition in determining the investment strategy. The Company works in collaboration
with the Scheme Trustee to ensure these interests are considered alongside those of the members of
the Scheme.
Other risks
In addition to investment risk, the Scheme exposes the Group to other risks, such as longevity risk,
inflation risk and interest rate risk. As the Scheme’s obligation is to provide lifetime pension benefits
to members upon retirement, increases in life expectancy will result in an increase in the Scheme’s
liabilities. Other assumptions used to value the defined benefit obligation are also uncertain.
These risks are managed through de-risking and hedging strategies and are measured and reported to
the Scheme’s Trustee. In particular, in October 2019 the Scheme completed a pensioner buy-in with
Scottish Widows for around 80% of the Scheme’s then pensioner liabilities. This buy-in asset now
represents 45.0% of the total Scheme assets as at 31 March 2025 (2024: 47.1%). This had the effect
of removing longevity and investment risks in respect of the liabilities for this part of the membership.
Winding up
Although currently there are no plans to do so, the Scheme could be wound up in which case the
benefits would have to be bought out with an insurance company. The cost of buying-out benefits
would be significantly more than the defined benefit obligation calculated in accordance with IAS 19.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
138
Notes to the Financial Statements (continued)
23. Retirement benefit schemes (continued)
Defined Contribution arrangements
All assets within the defined contribution section of the Scheme are held independently from the
Group.
The total cost charged to the income statement in relation to the defined contribution section for the
year ended 31 March 2025 was £11.2m (2024: £9.9m) and represents contributions payable to the
Scheme at rates specified in the rules of the Scheme. At 31 March 2025 contributions of £0.2m (2024:
£nil) due in respect of the current year had not been paid over to the defined contribution scheme.
Defined Benefits employee benefits
The reconciliation of the opening and closing statement of financial position is as follows:
2025
2024
Group and Company
£m
£m
At 1 April
39.0
42.6
Expense recognised in the income statement
(6.8)
(6.8)
Contributions paid
9.8
10.0
Total re-measurement included in other comprehensive income
14.1
(6.8)
At 31 March
56.1
39.0
The balance recognised in the statement of financial position is as follows:
2025
2024
Group and Company
£m
£m
Present value of defined benefit obligations
(769.1)
(855.0)
Fair value of plan assets
825.2
894.0
Net surplus arising from defined benefit obligation
56.1
39.0
Movements in the fair value of the defined benefit obligations are as follows:
2025
2024
Group and Company
£m
£m
At 1 April
855.0
873.7
Current service cost
7.5
7.9
Interest expense
39.7
40.2
Member contributions
1.3
1.3
Re-measurement:
Effect of changes in demographic assumptions
(2.2)
(14.3)
Effect of changes in financial assumptions
(76.5)
(7.0)
Effect of experience adjustments
1.3
9.1
Benefits paid
(57.0)
(55.9)
At 31 March
769.1
855.0
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
139
Notes to the Financial Statements (continued)
23. Retirement benefit schemes (continued)
Movements in the fair value of the Pension Scheme assets were as follows:
2025
2024
Group and Company
£m
£m
At 1 April
894.0
916.3
Interest income
41.8
42.4
Return on plan assets (net of interest income)
(63.3)
(19.0)
Employer contributions
9.8
10.0
Member contributions
1.3
1.3
Benefits paid
(57.0)
(55.9)
Administration expenses
(1.4)
(1.1)
At 31 March
825.2
894.0
The amount recognised in other comprehensive income is as follows:
2025
2024
Group and Company
£m
£m
Return on scheme assets excluding interest income
(63.3)
(19.0)
Actuarial gain arising from changes in demographic assumptions
2.2
14.3
Actuarial gain arising from changes in financial assumptions
76.5
7.0
Experience loss on liabilities
(1.3)
(9.1)
Total gain/(loss) recognised in other comprehensive income
14.1
(6.8)
The net pension expense before taxation recognised in the income statement, before capitalisation,
in respect of the Scheme is summarised as follows:
2025
2024
Group and Company
£m
£m
Current service cost
(7.5)
(7.9)
Interest income on plan assets
41.8
42.4
Interest expense on Scheme obligations
(39.7)
(40.2)
Administration expenses
(1.4)
(1.1)
Net pension expense before taxation
(6.8)
(6.8)
The above amounts are recognised in arriving at operating profit except for the interest on Scheme
assets and interest on Scheme obligations which have been recognised within finance expense (Note
9).
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
140
Notes to the Financial Statements (continued)
23. Retirement benefit schemes (continued)
The main financial assumptions used by the actuary (in determining the surplus) were as follows:
2025
2024
Group and Company
%
%
Discount rate
5.60
4.80
Pensionable salary increases
4.15*
3.05
Pension increases (RPI)
3.10
3.15
Price inflation (RPI)
3.35
3.40
Price inflation (CPI)
2.95
2.95
*CPIH +1.1% (4.15%) in 2025, 2026. CPIH (3.05%) from 2027 onwards.
The mortality rates utilised in the valuation are based on the standard actuarial tables S3PA_M (SAPS3
combined amounts MIDDLE) (2024: S3PA_M) tables with a scaling of 109% for male pensioners (2024:
109%), 107% for female pensioners (2024: 107%), 109% for male non-pensioners/future pensioners
(2024: 109%) and 107% for female non-pensioners/future pensioners (2024: 107%). These scaling
factors allow for differences in expected mortality between the Scheme population and the
population used in the standard tables. A long-term improvement rate of 1.25% p.a. is assumed within
the underlying CMI 2023 model (2024: 1.25% CMI 2022 model).
The current life expectancies underlying the value of the accrued liabilities for the Scheme are:
2025
2024
Group and Company
Years
Years
Male member - current age 45
25.8
25.8
Male member - current age 60
24.6
24.7
Female member - current age 45
29.0
28.9
Female member - current age 60
27.8
27.8
The following table presents a sensitivity analysis for each significant actuarial assumption, showing
how the defined benefit obligation would have been affected by changes in the relevant actuarial
assumption that were reasonably possible at the Statement of Financial Position date. The
calculations alter the relevant assumption by the amount specified, whilst assuming that all other
variables remained the same. The sensitivity analysis is for illustrative purposes and it is of note that
while the sensitivities below are based on isolated movements, in reality some assumptions are
interlinked and a movement in one may result in movements in others (e.g., inflation-based
assumptions).
2025
2024
Group and Company
£m
£m
Increase in Defined Benefit Obligation:
Discount rate: decrease by 25 basis points
23.4
27.1
Price inflation: increase by 25 basis points
17.5
16.4
Life expectancy: increase longevity by 1 year
23.9
34.2
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
141
Notes to the Financial Statements (continued)
23. Retirement benefit schemes (continued)
As at 31 March 2025, the fair value of the Scheme’s assets and liabilities recognised in the Statement
of Financial Position were as follows:
Scheme
assets
Quoted
Unquoted
Total
Value
Scheme
assets
Quoted
Unquoted
Total
Value
2025
2025
2025
2025
2024
2024
2024
2024
Group and Company
%
£m
£m
£m
%
£m
£m
£m
At 31 March
Cash
1.8
15.2
-
15.2
2.1
18.6
-
18.6
Debt instruments
31.2
162.2
95.1
257.3
30.3
195.6
75.1
270.7
Real estate
6.7
-
55.5
55.5
11.0
-
97.9
97.9
Distressed debt
0.3
-
2.1
2.1
0.5
-
4.4
4.4
Infrastructure equity
10.1
-
83.7
83.7
9.0
-
80.8
80.8
Asset backed securities
4.9
-
40.4
40.4
-
-
-
-
Pensioner buy-in
45.0
-
371.0
371.0
47.1
-
421.6
421.6
Fair value of assets
100.0
177.4
647.8
825.2
100.0
214.2
679.8
894.0
Present value of liabilities
(769.1)
(855.0)
Net retirement benefit
surplus
56.1
39.0
The fair value of the assets set out above are as per the quoted market prices in active markets.
Virgin Media vs NTL Pension Trust II Limited
In June 2023, in the case of Virgin Media Limited vs NTL Pension Trustee II Limited, the Trustee raised
a case to challenge whether an amendment to the pension scheme rules was invalid due to a lack of
actuarial confirmation required by law for contracted-out defined benefit schemes (under Section 37
of the Pensions Scheme Act 1993). The High Court ruled in favour of the Trustee on this matter. This
ruling was appealed at the Court of Appeal on 25 July 2024 however, the appeal was dismissed.
Therefore, as the law currently stands, a plan amendment to a contracted-out scheme carried out
between April 1997 and April 2016 without appropriate actuarial confirmation could be deemed void.
Since the outcome of the Court of Appeal judgement was announced, the Group sought legal advice
to ascertain the extent to which any historic amendments were certified by the scheme actuary (if
appropriate). The outcome of the legal review is that there is no reason to believe that the ruling in
the case will have any financial impact for the Company. However, the legal position is untested, and
it continues to evolve, so it is impossible to rule out the risk of challenge.
The legal advice was shared with the legal advisor to the Trustee of the ENW Group Pension Scheme.
Whilst the legal advisers to the Trustee have not forensically examined the analysis carried out, they
did not have any reason to disagree with the conclusion or believe that there is a fresh or freestanding
obligation on the trustees to look into this issue further as a matter of course.
Based on the current legal advice the Group has concluded that the ruling in the case will have no
material impact for the Company and the Group.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
142
Notes to the Financial Statements (continued)
24. Customer Contributions
Customer contributions are amounts received from a customer in respect of the provision of a new
connection to the network. Customer contributions are amortised through the Income Statement
over the expected lifetime of the relevant asset.
2025
2024
Group and Company
£m
£m
At 1 April
801.3
765.1
Additions during the year
37.5
57.1
Amortised through revenue (Note 4 & 34)
(21.8)
(20.9)
At 31 March
817.0
801.3
Split:
Amounts due in less than one year
67.1
81.0
Amounts due after more than one year
749.9
720.3
At 31 March
817.0
801.3
Refundable customer contributions are those customer contributions which may be partly refundable,
dependent on contractual obligations.
2025
2024
Group and Company
£m
£m
Refundable customer contributions
87.0
95.6
Non-refundable customer contributions
730.0
705.7
At 31 March
817.0
801.3
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
143
Notes to the Financial Statements (continued)
25. Deferred tax
The following are the major deferred tax liabilities and assets recognised by the Group and Company,
and the movements thereon, during the current and prior year.
Group and Company
Accelerated
Retirement
Other
Total
tax
benefit
depreciation
obligations
£m
£m
£m
£m
At 1 April 2023
295.1
10.3
(68.1)
237.3
Charged to profit or loss (Note 10)
16.5
0.8
9.3
26.6
Deferred tax on re-measurement of
defined benefit pension scheme
-
(1.7)
-
(1.7)
At 31 March 2024
311.6
9.4
(58.8)
262.2
Charged to profit or loss (Note 10)
28.7
1.1
13.4
43.2
Deferred tax on re-measurement of
defined benefit pension scheme
-
3.5
-
3.5
At 31 March 2025
340.3
14.0
(45.4)
308.9
Other timing differences relate primarily to derivative instruments, but also includes general
provision, pension contributions not paid, rollover relief, IFRS9 and IFRS16 transitional adjustments.
Deferred tax is calculated at 25% (2024: 25%), being the rate at which it is expected to reverse.
There are no unrecognised deferred tax assets or liabilities for either the Group or Company in either
the current or prior year.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
144
Notes to the Financial Statements (continued)
26. Provisions
2025
2024
Group and Company
£m
£m
At 1 April
0.7
1.0
Additions in the year
3.3
-
Utilisation of provision
(0.4)
(0.3)
At 31 March
3.6
0.7
At 31 March 2025, £2.5m (2024: £0.5m) of the balance is due in less than one year, £1.1m (2024:
£0.2m) is due after one year.
Additions in the year includes a provision relating to obligations arising from ongoing property-related
matters involving company infrastructure. The amount reflects management’s best estimate of
expected settlement costs based on current information. £2.5m (2024: £nil) of the balance is due in
less than one year, £0.8m (£2024: £nil) is due after one year.
The remainder of the provision relates to onerous lease provisions and is all due after one year.
27. Share capital
2025
2024
Group and Company
£
£
Authorised:
569,999,996 ordinary shares of 50 pence each (2024: 569,999,996)
284,999,998
284,999,998
4 ‘A’ ordinary shares of 50 pence each (2024: 4)
2
2
Special rights redeemable preference shares of £1 (2024: 1)
1
1
At 31 March
285,000,001
285,000,001
Allotted, called up and fully paid:
476,821,341 ordinary shares of 50 pence each (2024: 476,821,341)
238,410,671
238,410,671
4 ‘A’ ordinary shares of 50 pence each (2024: 4)
2
2
At 31 March
238,410,673
238,410,673
The ‘A’ ordinary shares and the ordinary shares rank pari passu in all respects, save that dividends may
be declared on one class of shares without being declared on the other.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
145
Notes to the Financial Statements (continued)
28. Shareholders’ Equity
Called up share
capital
Share premium
account
Revaluation
reserve
Capital
redemption
reserve
Retained
earnings
Total
equity
£m
£m
£m
£m
£m
£m
Group:
At 1 April 2024
238.4
4.4
70.0
8.6
757.0
1,078.4
Profit for the year
-
-
-
-
186.5
186.5
Other comprehensive income for the year
-
-
-
-
10.6
10.6
Transfer from revaluation reserve
-
-
(2.0)
-
2.0
-
-
-
(2.0)
-
199.1
197.1
Transactions with owners recorded directly
in equity:
Dividends (Note 30)
-
-
-
-
(45.4)
(45.4)
At 31 March 2025
238.4
4.4
68.0
8.6
910.7
1,230.1
Company:
At 1 April 2024
238.4
4.4
70.0
8.6
756.7
1,078.1
Profit for the year
-
-
-
-
186.5
186.5
Other comprehensive income for the year
-
-
-
-
10.6
10.6
Transfer from revaluation reserve
-
-
(2.0)
-
2.0
-
-
-
(2.0)
-
199.1
197.1
Transactions with owners recorded directly
in equity:
Dividends (Note 30)
-
-
-
-
(45.4)
(45.4)
At 31 March 2025
238.4
4.4
68.0
8.6
910.4
1,229.8
In 1997 the Company undertook a revaluation of certain assets, following North West Water’s
acquisition of Norweb. This resulted in the creation of a revaluation reserve of £234.9m. The
additional depreciation created as a result of the revaluation is transferred from the revaluation
reserve to retained earnings on an annual basis.
The capital redemption reserve is a non-distributable reserve specifically for the purchase of own
shares.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
146
Notes to the Financial Statements (continued)
29. Capital structure
Details of the authorised and allotted share capital, together with details of the movements in the
Company’s issued share capital during the year are shown in Note 27. The Company has Ordinary
shares, which carry no right to fixed income. Each share carries the right to one vote at general
meetings of the Company. The Company also has ‘A’ ordinary shares which rank pari passu in all
respects, save that dividends may be declared on one class of shares without being declared on the
other.
There exists an unissued special rights redeemable preference share which does not carry any voting
rights and can only be held by one of His Majesty’s Secretaries of State, another Minister of the Crown,
the Solicitor for the affairs of His Majesty’s Treasury or any other person acting on behalf of the Crown.
This share is a legacy from the privatisation of the Company and was issued on 19 November 1990
and redeemed on 31 March 1995.
There are no specific restrictions on the size of a holding or on the transfer of shares which are both
governed by the general provisions of the Articles of Association (“the Articles”) and prevailing
legislation. The directors are not aware of any agreements between holders of the Company’s shares
that may result in restrictions in the transfer of securities or on voting rights.
With regard to the appointment and replacement of directors, the Company is governed by its the
Articles, the Companies Act 2006 and related legislation. The Articles themselves may be amended
by special resolution of the shareholders. The powers of directors are described in the Articles, copies
of which are available on request, and in the Corporate Governance Report on pages 51 to 66.
Capital risk management
The capital structure of the Group consists of net debt, comprised of borrowings net of cash, and
equity, comprised of share capital and reserves.
The Group is subject to externally imposed capital requirements, by both Ofgem and financial lenders
and investors. These capital requirements include gearing levels, being the ratio of net debt to the
regulatory asset value (RAV). The forecast gearing position is closely monitored by the Board against
the external capital requirements (see page 38).
The RAV (2020/21 prices) is taken from the most recent Price Control Financial Model (PCFM)
published by Ofgem on its website and is calculated in accordance with the RIIO-ED2 methodology (1
April 2024 to 31 March 2028). For the year ended 31 March 2025, the RAV is £2,873.9m (2024:
£2,684.6m) and has been indexed using the CPIH for March 2025.
The Group manages its capital to ensure that entities in the Group will be able to continue as going
concerns while maximising the return to shareholders through the optimisation of the debt and equity
balance (see the dividend policy page 39), with regard to the externally imposed capital requirements.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
147
Notes to the Financial Statements (continued)
30. Dividends
Amounts recognised as distributions to equity holders in the year comprise:
2025
2024
Group and Company
£m
£m
Final dividend for the year ended 31 March 2023 of 3.90 pence per
share (paid June 2023)
-
18.6
Interim dividend for the year ended 31 March 2024 of 2.47 pence
per share (paid February 2024)
-
11.8
Final dividend for the year ended 31 March 2024 of 9.52 pence per
share (paid June 2024)
45.4
-
Dividends
45.4
30.4
No interim or final dividends for the year ended 31 March 2025 have been proposed at the date of
signing of this report.
31. Parent, ultimate parent and controlling party
The immediate parent undertaking is North West Electricity Networks plc (“NWEN plc”), a company
incorporated and registered in the United Kingdom. The registered address of the immediate parent
undertaking is Borron Street, Stockport, Cheshire, SK1 2JD.
The smallest group in which the current and prior year results of the Company are consolidated is that
headed by NWEN plc; those consolidated financial statements can be obtained from the above
address.
The largest group in which the full current and prior year results of the Company are consolidated is
that headed by North West Electricity Networks (Jersey) Limited (“NWEN (Jersey)”), a company
incorporated and registered in Jersey; those consolidated financial statements can be obtained from
the registered address of NWEN (Jersey), which is 44 Esplanade, St Helier, Jersey, Channel Islands, JE4
9WG.
At 31 March 2024, the ultimate parent undertaking and ultimate controlling party was NWEN (Jersey).
On 22 October 2024, Scottish Power Energy Networks Holdings Limited (“Scottish Power”), part of the
group headed by Iberdrola, S.A., acquired 88% of the shares of NWEN (Jersey), with the remaining
12% of the shares retained by KDM Power Limited.
The transaction was subject to review by the Competition and Markets Authority (“CMA”) pursuant
to the regulations applicable to mergers of energy network companies in the United Kingdom; the
CMA imposed an Initial Enforcement Order (“IEO”) preventing any integration until CMA approval was
granted. CMA approval was granted, and the IEO lifted, on 20 March 2025.
In the period from 22 October 2024 to 20 March 2025, despite Scottish Power’s 88% equity ownership
of NWEN (Jersey), Scottish Power did not control NWEN (Jersey), nor therefore the Company, due to
the restrictions in the IEO. Scottish Power gained control of NWEN (Jersey) on 20 March 2025, when
the CMA approval was granted and the IEO lifted.
At 31 March 2025, the directors regard Iberdrola, S.A., a company incorporated and registered in
Spain, as the ultimate parent undertaking and the ultimate controlling party. The largest group that
will consolidate the results of the Company from 20 March is that headed by Iberdrola, S.A. The
registered address of Iberdrola is Torre Iberdrola, Plaza Euskadi 5, 48009, Bilbao, Spain.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
148
Notes to the Financial Statements (continued)
32. Related party transactions
Transactions between the Company and its subsidiaries, which are related parties, have been
eliminated on consolidation and are not disclosed in this note. During the year the following
transactions with related parties were entered into:
Group
Company
Group
Company
2025
2025
2024
2024
£m
£m
£m
£m
Recharges to:
Electricity North West (Construction and Maintenance)
1.9
1.9
2.3
2.3
Limited
Electricity North West Services Limited
1.6
1.6
1.3
1.3
Electricity North West Property Limited
0.1
0.1
0.1
0.1
Recharges from:
Electricity North West (Construction and Maintenance)
(1.5)
(1.5)
(1.2)
(1.2)
Limited
Electricity North West Services Limited
(9.6)
(9.6)
(8.1)
(8.1)
Interest on group borrowings:
North West Electricity Networks plc
(4.5)
(4.5)
(4.2)
(4.2)
ENW Finance plc
(25.5)
(25.5)
(25.4)
(25.4)
Interest on group borrowings (Note 9)
(30.0)
(30.0)
(29.6)
(29.6)
Reimbursement of inter-company loan impairment on
loan from ENW Finance plc (Note 9)
(0.2)
(0.2)
(0.4)
(0.4)
Fair value movement on inter-company derivative
24.9
24.9
95.2
95.2
asset with ENW Finance plc (Note 9)
Fair value movement on inter-company derivative
(24.9)
(24.9)
(95.2)
(95.2)
liability with ENW Finance plc (Note 9)
Dividends paid to North West Electricity Networks plc
(45.4)
(45.4)
(30.4)
(30.4)
(Note 30)
Directors’ remuneration (Note 7)
(5.5)
(5.5)
(3.0)
(3.0)
For disclosure relating to executive directors’ remuneration see Note 7. The Company’s key
management personnel comprise of its executive directors.
As disclosed in Note 31, on the 22 October 2024 88% of the NWEN (Jersey) group was acquired by
Iberdrola, S.A. On the same date the CMA imposed an IEO which prevented the Iberdrola group from
controlling the companies in the NWEN (Jersey) group. The IEO was lifted on the 20
March 2025 from
which point Iberdrola obtained control. During the year ended 31 March 2025 the transactions
between ENWL and the companies in the Iberdrola group were in relation to sales and purchases,
conducted on a business-as-usual and arm’s length basis. For the period from 20 March to 31 March
2025 the sales amounted to £0.9m and the purchases to £0.1m. For the period from 22 October 2024
to 31 March 2025 the sales amounted to £12.3m and the purchases to £1.1m. During the year ended
31 March 2025, recharges made to companies in the Iberdrola group consisted of £0.3m, of which
£0.2m was outstanding at year-end.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
149
Notes to the Financial Statements (continued)
32. Related party transactions (continued)
Amounts outstanding with related parties are as follows:
Group
Company
Group
Company
2025
2025
2024
2024
£m
£m
£m
£m
Amounts owed by group companies:
North West Electricity Networks plc
3.7
3.7
3.6
3.6
Electricity
North
West
(Construction
and
1.6
1.6
1.0
1.0
Maintenance) Limited
Electricity North West Services Limited
0.7
0.7
0.4
0.4
Electricity North West Property Limited
0.1
0.1
0.1
0.1
North West Electricity Networks (Finance) Limited
0.1
0.1
0.1
0.1
North West Electricity Networks (Jersey) Limited
0.2
0.2
0.2
0.2
North West Electricity Networks (Holdings) Limited
0.4
0.4
0.3
0.3
North West Electricity Networks (UK) Limited
0.6
0.6
0.1
0.1
Total owed by group companies (Note 16)
7.4
7.4
5.8
5.8
Amounts owed to subsidiaries:
Electricity North West Number 1 Company Limited
-
(15.5)
-
(15.5)
Interest payable to group companies:
North West Electricity Networks plc
(1.3)
(1.3)
(1.3)
(1.3)
ENW Finance plc
(10.4)
(10.4)
(10.7)
(10.7)
Other amounts payable to group companies:
Electricity North West Services Limited
(0.9)
(0.9)
(0.9)
(0.9)
North West Electricity Networks (Holdings) Limited
(0.2)
(0.2)
(0.2)
(0.2)
North West Electricity Networks (Jersey) Limited
(0.1)
(0.1)
(0.1)
(0.1)
North West Electricity Networks plc
(0.2)
(0.2)
(0.1)
(0.1)
Electricity
North
West
(Construction
and
(0.3)
(0.3)
(0.2)
(0.2)
Maintenance) Limited
Total owed to group companies (Note 18)
(13.4)
(13.4)
(13.5)
(13.5)
Borrowings payable to:
North West Electricity Networks plc (Note 19)
1
(111.1)
(111.1)
(109.8)
(109.8)
ENW Finance plc (Note 19)
2
(722.3)
(722.3)
(721.9)
(721.9)
Group tax relief owed by / (owed to):
North West Electricity Networks plc
(17.1)
(17.1)
(13.8)
(13.8)
North West Electricity Networks (Holdings) Ltd
-
-
(0.6)
(0.6)
North West Electricity Networks (UK) Ltd
0.4
0.4
(0.4)
(0.4)
Derivative asset with ENW Finance plc (Note 20)
192.2
192.2
217.1
217.1
Derivative liability with ENW Finance plc (Note 20)
(192.2)
(192.2)
(217.1)
(217.1)
1
This loan accrues weighted average interest at 4.11% (2024: 4.10%) and is repayable in March 2028.
2
This balance relates to two loans; £299.1m (2024: £299.0m) accrues interest at 1.415% and matures
in 2030, and £423.2m (2024: £422.9m) accrues interest at 4.893% and matures in 2032.
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
150
Notes to the Financial Statements (continued)
33. Contractual commitments
The following commitments have been contracted for but have not been recognised as liabilities in
the financial statements:
2025
2024
Group and Company
£m
£m
Acquisition of software (Note 13)
9.6
2.1
Acquisition of property, plant and equipment (Note 11)
75.8
39.3
Contractual commitments
85.4
41.4
34. Cash flow information
Cash generated from operations
2025
2024
Group and Company
£m
£m
Operating profit
280.8
229.1
Adjustments for:
Depreciation of property, plant and equipment (Note 5 & 11)
142.8
132.5
Amortisation of intangible asset (Note 5 & 13)
14.2
14.2
Amortisation of customer contributions (Note 4 & 24)
(21.8)
(20.9)
Profit on disposal of property, plant and equipment (Note 5)
(0.5)
(0.2)
Cash contributions in excess of pension charge to operating profit
(4.7)
(4.6)
Operating cash flows before movements in working capital
410.8
350.1
Changes in working capital:
Increase in inventories
(7.5)
(26.9)
Decrease/(increase) in trade and other receivables
2.9
(4.2)
Increase/(decrease) in trade and other payables
6.0
(7.7)
Cash generated from operations
412.2
311.3
Net debt reconciliation
This section sets out an analysis of net debt and the movements in net debt.
2025
2024
Group and Company
£m
£m
Cash and cash equivalents (Note 17)
132.1
189.8
Borrowings (Note 19)
(1,565.8)
(1,570.0)
Net debt
(1,433.7)
(1,380.2)
Electricity North West Limited
Annual Report and Consolidated Financial Statements for the year ended 31 March 2025
151
Notes to the Financial Statements (continued)
34. Cash flow information (continued)
Change in liabilities arising from financing activities
This section sets out an analysis of the movements in the Group’s liabilities for which cash flows have
been, or will be, classified as financing activities in the statement of cash flows.
Borrowings
Cash and cash
equivalents
Money market
deposits
over
three
months
Total
Group and Company
£m
£m
£m
£m
Net debt at 1 April 2023
(1,763.1)
173.8
305.7
(1,283.6)
Financing cash flows
221.4
16.0
(305.7)
(68.3)
Indexation (Note 9)
(31.0)
-
-
(31.0)
New leases (Note 19)
(2.6)
-
-
(2.6)
Transaction costs on new borrowings (Note 19)
0.1
-
-
0.1
Amortisation of transaction costs, discounts and
premiums (Note 19)
5.2
-
-
5.2
Net debt at 31 March 2024
(1,570.0)
189.8
-
(1,380.2)
Financing cash flows
9.9
(57.7)
-
(47.8)
Indexation (Note 9)
(9.6)
-
-
(9.6)
New leases (Note 19)
(2.7)
-
-
(2.7)
Transaction costs on new borrowings (Note 19)
1.3
-
-
1.3
Amortisation of transaction costs, discounts and
premiums (Note 19)
5.3
-
-
5.3
Net debt at 31 March 2025
(1,565.8)
132.1
-
(1,433.7)
Where applicable, interest on borrowings is included in operating activities in the statement of cash
flows and accruals within current liabilities in the statement of financial position and is, therefore,
excluded from this analysis.
35. Post balance sheet events
On 16 June 2025 Scottish Power UK plc provided North West Electricity Networks (Jersey) Limited
(“NWEN (Jersey)”) with a letter of support detailing the financial support it has committed to the group
headed by NWEN (Jersey). An amount of £500.0m is available and can be utilised by NWEN (Jersey)
and any of its subsidiaries, including the Company. This commitment will remain in place until the
earlier of the NWEN (Jersey) group securing alternative financing, or 12 months from the date of
approval of these financial statements, and will incur a charge of 20 basis points per annum whilst in
place.