{
 "documentInfo": {
  "documentType": "https://xbrl.org/2021/xbrl-json",
  "features": {
   "xbrl:canonicalValues": true
  },
  "namespaces": {
   "ifrs-full": "http://xbrl.ifrs.org/taxonomy/2021-03-24/ifrs-full",
   "iso4217": "http://www.xbrl.org/2003/iso4217",
   "oxurion": "http://oxurion.com/xbrl/2022",
   "scheme": "http://standards.iso.org/iso/17442",
   "xbrl": "https://xbrl.org/2021",
   "xbrli": "http://www.xbrl.org/2003/instance"
  },
  "taxonomy": [
   "http://oxurion.com/xbrl/2022/oxurion-2022-12-31.xsd"
  ]
 },
 "facts": {
  "fact-1": {
   "value": "4.4  FEES TO THE STATUTORY AUDITOR IN '000 EURO (AS AT 31 DECEMBER) 2022 2021 Remuneration audit mandate 113 90 Other legal assignments of the auditor 18 48 Other services provided by the PwC/network 0 3 In 2022, fees totalling 113,000 euro were paid for the audit mandates of Oxurion and Oncurious. The 2021 fees involved other services provided by the Statutory Auditor\u2019s network related to tax services provided in the UK and closing of the Irish Branch and were pre-ap- proved by the Audit Committee",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAuditorsRemunerationExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-139": {
   "value": "595000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Revenue",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-140": {
   "value": "1128000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Revenue",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-141": {
   "value": "513000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CostOfSales",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-142": {
   "value": "612000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CostOfSales",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-143": {
   "value": "82000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:GrossProfit",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-144": {
   "value": "516000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:GrossProfit",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-145": {
   "value": "15986000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ResearchAndDevelopmentExpense",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-146": {
   "value": "20696000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ResearchAndDevelopmentExpense",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-147": {
   "value": "5980000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:GeneralAndAdministrativeExpense",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-148": {
   "value": "7150000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:GeneralAndAdministrativeExpense",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-149": {
   "value": "892000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:SellingExpense",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-150": {
   "value": "1274000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:SellingExpense",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-151": {
   "value": "830000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:MiscellaneousOtherOperatingIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-152": {
   "value": "1245000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:MiscellaneousOtherOperatingIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-153": {
   "value": "-0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:MiscellaneousOtherOperatingExpense",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-154": {
   "value": "9000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:MiscellaneousOtherOperatingExpense",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-155": {
   "value": "1000000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:ImpairmentLossRecognisedInProfitOrLossIntangibleAssetsOtherThanGoodwill",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-156": {
   "value": "1127000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:ImpairmentLossRecognisedInProfitOrLossIntangibleAssetsOtherThanGoodwill",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-157": {
   "value": "-22946000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromOperatingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-158": {
   "value": "-28495000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromOperatingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-159": {
   "value": "639000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:FinanceIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-160": {
   "value": "171000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:FinanceIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-161": {
   "value": "9379000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:FinanceCosts",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-162": {
   "value": "1268000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:FinanceCosts",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-163": {
   "value": "-31686000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossBeforeTax",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-164": {
   "value": "-29592000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossBeforeTax",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-165": {
   "value": "7000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxExpenseContinuingOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-166": {
   "value": "3000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxExpenseContinuingOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-167": {
   "value": "-31693000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-168": {
   "value": "-29595000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-169": {
   "value": "-31685000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToOwnersOfParent",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-170": {
   "value": "-29158000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToOwnersOfParent",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-171": {
   "value": "-8000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToNoncontrollingInterests",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-172": {
   "value": "-437000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToNoncontrollingInterests",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-173": {
   "value": "-0.37",
   "decimals": 4,
   "dimensions": {
    "concept": "ifrs-full:BasicEarningsLossPerShare",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR/xbrli:shares"
   }
  },
  "fact-174": {
   "value": "-0.77",
   "decimals": 4,
   "dimensions": {
    "concept": "ifrs-full:BasicEarningsLossPerShare",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR/xbrli:shares"
   }
  },
  "fact-175": {
   "value": "-0.37",
   "decimals": 4,
   "dimensions": {
    "concept": "ifrs-full:DilutedEarningsLossPerShare",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR/xbrli:shares"
   }
  },
  "fact-176": {
   "value": "-0.77",
   "decimals": 4,
   "dimensions": {
    "concept": "ifrs-full:DilutedEarningsLossPerShare",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR/xbrli:shares"
   }
  },
  "fact-177": {
   "value": "-31693000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-178": {
   "value": "-29595000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-179": {
   "value": "361000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-180": {
   "value": "566000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-181": {
   "value": "-5000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-182": {
   "value": "-5000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-183": {
   "value": "356000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeThatWillNotBeReclassifiedToProfitOrLossNetOfTax",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-184": {
   "value": "561000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeThatWillNotBeReclassifiedToProfitOrLossNetOfTax",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-185": {
   "value": "101000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:GainsLossesOnExchangeDifferencesOnTranslationNetOfTax",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-186": {
   "value": "122000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:GainsLossesOnExchangeDifferencesOnTranslationNetOfTax",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-187": {
   "value": "101000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOfForeignOperationsAndHedgesOfNetInvestmentsInForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-188": {
   "value": "122000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOfForeignOperationsAndHedgesOfNetInvestmentsInForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-189": {
   "value": "457000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-190": {
   "value": "683000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-191": {
   "value": "-31236000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-192": {
   "value": "-28912000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-193": {
   "value": "-31228000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToOwnersOfParent",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-194": {
   "value": "-28475000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToOwnersOfParent",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-195": {
   "value": "-8000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToNoncontrollingInterests",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-196": {
   "value": "-437000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToNoncontrollingInterests",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-197": {
   "value": "99000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:PropertyPlantAndEquipment",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-198": {
   "value": "120000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:PropertyPlantAndEquipment",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-199": {
   "value": "963000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:RightofuseAssets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-200": {
   "value": "252000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:RightofuseAssets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-201": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IntangibleAssetsOtherThanGoodwill",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-202": {
   "value": "1000000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IntangibleAssetsOtherThanGoodwill",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-203": {
   "value": "40000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentAssets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-204": {
   "value": "95000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentAssets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-205": {
   "value": "3785000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentNonfinancialAssets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-206": {
   "value": "4000000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentNonfinancialAssets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-207": {
   "value": "4887000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentAssets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-208": {
   "value": "5467000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentAssets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-209": {
   "value": "5000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:Inventories",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-210": {
   "value": "60000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:Inventories",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-211": {
   "value": "3321000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherReceivables",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-212": {
   "value": "2517000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherReceivables",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-213": {
   "value": "189000",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:NonCurrentResearchAndDevelopmentIncentivesReceivablesandCurrentreceivablesfromtaxesotherthanincometax",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-214": {
   "value": "845000",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:NonCurrentResearchAndDevelopmentIncentivesReceivablesandCurrentreceivablesfromtaxesotherthanincometax",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-215": {
   "value": "95000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:ShorttermDepositsNotClassifiedAsCashEquivalents",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-216": {
   "value": "247000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:ShorttermDepositsNotClassifiedAsCashEquivalents",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-217": {
   "value": "3496000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-218": {
   "value": "9740000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-219": {
   "value": "7106000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CurrentAssets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-220": {
   "value": "13409000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CurrentAssets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-221": {
   "value": "11993000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Assets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-222": {
   "value": "18876000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Assets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-223": {
   "value": "65443000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssuedCapital",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-224": {
   "value": "46029000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssuedCapital",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-225": {
   "value": "250000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:SharePremium",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-226": {
   "value": "234000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:SharePremium",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-227": {
   "value": "101000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:AccumulatedOtherComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-228": {
   "value": "-356000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:AccumulatedOtherComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-229": {
   "value": "3027000",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:OtherreservesexcludingOCIreserves",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-230": {
   "value": "-5266000",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:OtherreservesexcludingOCIreserves",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-231": {
   "value": "-73404000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:RetainedEarnings",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-232": {
   "value": "-41719000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:RetainedEarnings",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-233": {
   "value": "-4583000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:EquityAttributableToOwnersOfParent",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-234": {
   "value": "-1078000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:EquityAttributableToOwnersOfParent",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-235": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:NoncontrollingInterests",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-236": {
   "value": "-30000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:NoncontrollingInterests",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-237": {
   "value": "-4583000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-238": {
   "value": "-1108000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-239": {
   "value": "833000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentLeaseLiabilities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-240": {
   "value": "44000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentLeaseLiabilities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-241": {
   "value": "159000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentRecognisedLiabilitiesDefinedBenefitPlan",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-242": {
   "value": "594000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentRecognisedLiabilitiesDefinedBenefitPlan",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-243": {
   "value": "3235000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentPortionOfNoncurrentBondsIssued",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-244": {
   "value": "8433000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentPortionOfNoncurrentBondsIssued",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-245": {
   "value": "4227000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentLiabilities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-246": {
   "value": "9071000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentLiabilities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-247": {
   "value": "5040000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherCurrentPayablesToTradeSuppliers",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-248": {
   "value": "4979000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherCurrentPayablesToTradeSuppliers",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-249": {
   "value": "139000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CurrentLeaseLiabilities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-250": {
   "value": "221000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CurrentLeaseLiabilities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-251": {
   "value": "3809000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CurrentBondsIssuedAndCurrentPortionOfNoncurrentBondsIssued",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-252": {
   "value": "3401000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CurrentBondsIssuedAndCurrentPortionOfNoncurrentBondsIssued",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-253": {
   "value": "3361000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentLiabilities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-254": {
   "value": "2312000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentLiabilities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-255": {
   "value": "12349000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CurrentLiabilities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-256": {
   "value": "10913000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CurrentLiabilities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-257": {
   "value": "11993000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:EquityAndLiabilities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-258": {
   "value": "18876000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:EquityAndLiabilities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-259": {
   "value": "-31693000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-260": {
   "value": "-29595000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-261": {
   "value": "1555000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFinanceCosts",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-262": {
   "value": "896000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFinanceCosts",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-263": {
   "value": "203000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFinanceIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-264": {
   "value": "171000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFinanceIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-265": {
   "value": "63000",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:Adjustmentsfordepreciationexpenseotherthanright-of-useassets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-266": {
   "value": "77000",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:Adjustmentsfordepreciationexpenseotherthanright-of-useassets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-267": {
   "value": "1000000",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:AdjustmentsForAmortisationExpenseAndImpairmentLossReversalOfImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-268": {
   "value": "1127000",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:AdjustmentsForAmortisationExpenseAndImpairmentLossReversalOfImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-269": {
   "value": "290000",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:Adjustmentsfordepreciationexpenseonright-of-useassets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-270": {
   "value": "600000",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:Adjustmentsfordepreciationexpenseonright-of-useassets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-271": {
   "value": "1000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForGainLossOnDisposalsPropertyPlantAndEquipment",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-272": {
   "value": "344000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForGainLossOnDisposalsPropertyPlantAndEquipment",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-273": {
   "value": "7388000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFairValueGainsLosses",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-274": {
   "value": "372000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFairValueGainsLosses",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-275": {
   "value": "0",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:Reversalofimpairmentlossesoncurrentassets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-276": {
   "value": "629000",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:Reversalofimpairmentlossesoncurrentassets",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-277": {
   "value": "-75000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForProvisions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-278": {
   "value": "64000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForProvisions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-279": {
   "value": "933000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForSharebasedPayments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-280": {
   "value": "1107000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForSharebasedPayments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-281": {
   "value": "215000",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseintradeandotherreceivablesandinventories",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-282": {
   "value": "-2037000",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseintradeandotherreceivablesandinventories",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-283": {
   "value": "1149000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncreaseDecreaseInOtherCurrentLiabilities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-284": {
   "value": "297000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncreaseDecreaseInOtherCurrentLiabilities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-285": {
   "value": "-19379000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-286": {
   "value": "-26978000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-287": {
   "value": "18000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromSalesOfPropertyPlantAndEquipmentClassifiedAsInvestingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-288": {
   "value": "394000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromSalesOfPropertyPlantAndEquipmentClassifiedAsInvestingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-289": {
   "value": "147000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInDecreaseIncreaseInShorttermDepositsAndInvestments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-290": {
   "value": "36000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInDecreaseIncreaseInShorttermDepositsAndInvestments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-291": {
   "value": "5000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:InterestReceivedClassifiedAsInvestingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-292": {
   "value": "9000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:InterestReceivedClassifiedAsInvestingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-293": {
   "value": "59000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfPropertyPlantAndEquipmentClassifiedAsInvestingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-294": {
   "value": "32000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfPropertyPlantAndEquipmentClassifiedAsInvestingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-295": {
   "value": "111000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-296": {
   "value": "407000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-297": {
   "value": "294000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:PaymentsOfLeaseLiabilitiesClassifiedAsFinancingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-298": {
   "value": "599000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:PaymentsOfLeaseLiabilitiesClassifiedAsFinancingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-299": {
   "value": "7150000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromIssueOfBondsNotesAndDebentures",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-300": {
   "value": "11150000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromIssueOfBondsNotesAndDebentures",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-301": {
   "value": "3605000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:RepaymentsOfBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-302": {
   "value": "0",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:RepaymentsOfBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-303": {
   "value": "-7000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherInflowsOutflowsOfCashClassifiedAsFinancingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-304": {
   "value": "-20000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherInflowsOutflowsOfCashClassifiedAsFinancingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-305": {
   "value": "6000",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:BetaaldeRenteOpLeaseverplichtinEn",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-306": {
   "value": "3000",
   "decimals": 0,
   "dimensions": {
    "concept": "oxurion:BetaaldeRenteOpLeaseverplichtinEn",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-307": {
   "value": "0",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromChangesInOwnershipInterestsInSubsidiaries",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-308": {
   "value": "86000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromChangesInOwnershipInterestsInSubsidiaries",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-309": {
   "value": "10405000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromIssueOfOrdinaryShares",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-310": {
   "value": "1350000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromIssueOfOrdinaryShares",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-311": {
   "value": "642000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:InterestPaidClassifiedAsFinancingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-312": {
   "value": "186000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:InterestPaidClassifiedAsFinancingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-313": {
   "value": "13001000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-314": {
   "value": "11778000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivities",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-315": {
   "value": "-6267000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInCashAndCashEquivalents",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-316": {
   "value": "-14793000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInCashAndCashEquivalents",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-317": {
   "value": "9740000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-318": {
   "value": "24511000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-319": {
   "value": "23000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:EffectOfExchangeRateChangesOnCashAndCashEquivalents",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-320": {
   "value": "22000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:EffectOfExchangeRateChangesOnCashAndCashEquivalents",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-321": {
   "value": "3496000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-322": {
   "value": "9740000",
   "decimals": 0,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-323": {
   "value": "44913000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-324": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-325": {
   "value": "-1039000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-326": {
   "value": "6133000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-327": {
   "value": "-12561000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-328": {
   "value": "25180000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-329": {
   "value": "-132000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-330": {
   "value": "25048000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-331": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-332": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-333": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-334": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-335": {
   "value": "-29158000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-336": {
   "value": "-29158000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-337": {
   "value": "-437000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-338": {
   "value": "-29595000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-339": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-340": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-341": {
   "value": "122000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-342": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-343": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-344": {
   "value": "122000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-345": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-346": {
   "value": "122000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-347": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-348": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-349": {
   "value": "566000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-350": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-351": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-352": {
   "value": "566000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-353": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-354": {
   "value": "566000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-355": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-356": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-357": {
   "value": "-5000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-358": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-359": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-360": {
   "value": "-5000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-361": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-362": {
   "value": "-5000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-363": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-364": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-365": {
   "value": "683000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-366": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-367": {
   "value": "-29158000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-368": {
   "value": "-28475000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-369": {
   "value": "-437000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-370": {
   "value": "-28912000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-371": {
   "value": "1116000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-372": {
   "value": "234000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-373": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-374": {
   "value": "213000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-375": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-376": {
   "value": "1563000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-377": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-378": {
   "value": "1563000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-379": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-380": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-381": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-382": {
   "value": "1107000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-383": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-384": {
   "value": "1107000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-385": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-386": {
   "value": "1107000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-387": {
   "value": "1116000",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-388": {
   "value": "234000",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-389": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-390": {
   "value": "1320000",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-391": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-392": {
   "value": "2670000",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-393": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-394": {
   "value": "2670000",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-395": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-396": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-397": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-398": {
   "value": "-453000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-399": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-400": {
   "value": "-453000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-401": {
   "value": "539000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-402": {
   "value": "86000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-403": {
   "value": "46029000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-404": {
   "value": "234000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-405": {
   "value": "-356000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-406": {
   "value": "-5266000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-407": {
   "value": "-41719000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-408": {
   "value": "-1078000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-409": {
   "value": "-30000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-410": {
   "value": "-1108000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-411": {
   "value": "46029000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-412": {
   "value": "234000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-413": {
   "value": "-356000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-414": {
   "value": "-5266000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-415": {
   "value": "-41719000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-416": {
   "value": "-1078000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-417": {
   "value": "-30000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-418": {
   "value": "-1108000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-419": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-420": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-421": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-422": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-423": {
   "value": "-31685000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-424": {
   "value": "-31685000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-425": {
   "value": "-8000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-426": {
   "value": "-31693000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-427": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-428": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-429": {
   "value": "101000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-430": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-431": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-432": {
   "value": "101000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-433": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-434": {
   "value": "101000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslationOtherThanTranslationOfForeignOperations",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-435": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-436": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-437": {
   "value": "361000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-438": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-439": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-440": {
   "value": "361000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-441": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-442": {
   "value": "361000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-443": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-444": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-445": {
   "value": "-5000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-446": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-447": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-448": {
   "value": "-5000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-449": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-450": {
   "value": "-5000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-451": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-452": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-453": {
   "value": "457000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-454": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-455": {
   "value": "-31685000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-456": {
   "value": "-31228000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-457": {
   "value": "-8000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-458": {
   "value": "-31236000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-459": {
   "value": "19414000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-460": {
   "value": "16000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-461": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-462": {
   "value": "7398000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-463": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-464": {
   "value": "26828000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-465": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-466": {
   "value": "26828000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-467": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-468": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-469": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-470": {
   "value": "933000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-471": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-472": {
   "value": "933000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-473": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-474": {
   "value": "933000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-475": {
   "value": "19414000",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-476": {
   "value": "16000",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-477": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-478": {
   "value": "8331000",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-479": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-480": {
   "value": "27761000",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-481": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-482": {
   "value": "27761000",
   "decimals": -3,
   "dimensions": {
    "concept": "oxurion:IncreaseDecreaseThroughTransactionsWithOwnersexcludingtransactionswithNCI",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-483": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-484": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-485": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-486": {
   "value": "-38000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-487": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-488": {
   "value": "-38000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-489": {
   "value": "38000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-490": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-491": {
   "value": "65443000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-492": {
   "value": "250000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-493": {
   "value": "101000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:AccumulatedOtherComprehensiveIncomeMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-494": {
   "value": "3027000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "oxurion:OtherReservesExcludingOCIReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-495": {
   "value": "-73404000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-496": {
   "value": "-4583000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-497": {
   "value": "0",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "fact-498": {
   "value": "-4583000",
   "decimals": -3,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "fact-122": {
   "value": "5.5<span class=\"_ _3\"></span> <span class=\"_ _b\"> </span><span class=\"ls0 ws0\">GENERAL NO<span class=\"_ _4\"></span>TES T<span class=\"_ _1\"></span>O </span>THE CON<span class=\"_ _3\"></span>SOLIDA<span class=\"_ _25\"></span>TED FI<span class=\"_ _3\"></span>NA<span class=\"_ _3\"></span>N<span class=\"_ _3\"></span>CI<span class=\"_ _3\"></span>AL<span class=\"_ _3\"></span> ST<span class=\"_ _1\"></span>A<span class=\"_ _1\"></span>TEM<span class=\"_ _3\"></span>EN<span class=\"_ _3\"></span>TS<span class=\"_ _1a9\"> </span>5.5.<span class=\"_ _4\"></span>1 <span class=\"_ _58\"> </span><span class=\"ls0 ws0\">Reporting ent<span class=\"_ _4\"></span>ity<span class=\"_ _1a9\"> </span></span>Oxurion is a public limited liability compan<span class=\"_ _4\"></span>y (in Dutch: Naamloze V<span class=\"_ _4\"></span>ennootsc<span class=\"_ _4\"></span>hap) established under Belgian law with its reg<span class=\"_ _4\"></span>istered office at Gaston Geenslaan 1<span class=\"_ _1\"></span>, B-3001 Leuven,<span class=\"_ _4\"></span> with tw<span class=\"_ _4\"></span>o wholly o<span class=\"_ _4\"></span>wned subsidiaries \u2013 ThromboGenics and Oncurious (wholl<span class=\"_ _4\"></span>y owned as of December 14<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022)<span class=\"_ _1\"></span>. Oxurion,<span class=\"_ _4\"></span> ThromboGenics and Oncurious are biopharmaceutical companies focusing on the development of new drugs for the treatment of ey<span class=\"_ _4\"></span>e diseases and cancer<span class=\"_ _1\"></span>. The Group has built a pipeline of drug candidates,<span class=\"_ _1\"></span> one of which is actively in the clinic<span class=\"_ _4\"></span>. The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s research and development facilities are located in Belgium.<span class=\"_ _1a9\"> </span>The consolidated financial statements of Oxurion for the year ending December 3<span class=\"_ _4\"></span>1<span class=\"_ _1\"></span>, 2022,<span class=\"_ _1\"></span> include the entire Group<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>These consolidated financial statements w<span class=\"_ _4\"></span>ere appro<span class=\"_ _4\"></span>ved by the Board of Dir<span class=\"_ _4\"></span>ectors on March 30<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> 2023<span class=\"_ _1\"></span>. Possible changes to this Annual Report can be carried out until the A<span class=\"_ _4\"></span>GM of May 2,<span class=\"_ _4\"></span> 2023<span class=\"_ _1a9\"> </span><span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>5.5.<span class=\"_ _3\"></span>2<span class=\"_ _3\"></span> <span class=\"_ _5a\"> </span><span class=\"ls0 ws0\">Applica<span class=\"_ _4\"></span>ti<span class=\"_ _4\"></span>on of new and r<span class=\"_ _4\"></span>evised </span>standar<span class=\"_ _4\"></span>ds and in<span class=\"_ _4\"></span>ter<span class=\"_ _4\"></span>pret<span class=\"_ _4\"></span>ati<span class=\"_ _4\"></span>ons t<span class=\"_ _4\"></span>o the consol<span class=\"_ _4\"></span>idat<span class=\"_ _4\"></span>ed financi<span class=\"_ _4\"></span>al stat<span class=\"_ _4\"></span>ements<span class=\"_ _1a9\"> </span>New Standards,<span class=\"_ _1\"></span> Interpretations and Amendments adopted by the Group<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>During 2022,<span class=\"_ _4\"></span> the Group has adopted all the new and revised Standards and Interpr<span class=\"_ _4\"></span>etations issued by the International Accounting Standards Board (<span class=\"ff3 ws0\">\u201cIASB\u201d</span>) and the IFRS Interpretations Committee (<span class=\"ff3 ws73\">\u201cIFRS IC\u201d</span>) of the IASB as adopted by the European Union (<span class=\"ff3 ws0\">\u201cEU\u201d</span>) and effective for the accounting y<span class=\"_ _4\"></span>ear starting on Januar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022. The Group has not app<span class=\"_ _4\"></span>lied any new IFRS r<span class=\"_ _4\"></span>equire<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments that are not y<span class=\"_ _4\"></span>et effective as of December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>The follo<span class=\"_ _4\"></span>wing new Standards<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> Interpretations and Amendments issued by the IASB and the IFRS IC as adopted by the European Union ar<span class=\"_ _4\"></span>e effective for the financial period:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws22c\">Amendment to IFRS 16 Leases: COVID-19-Related </span>Rent Concessions beyond 30 J<span class=\"_ _4\"></span>une 2021 (applicable for annual periods beginning on or after 1 April 1<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021)<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws192\">Amendments to IAS 16 Proper<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>, Plant and Equipment: </span>Proceeds before Intended Use (app<span class=\"_ _4\"></span>licable for ann<span class=\"_ _4\"></span>ual periods beginning on or after 1 J<span class=\"_ _4\"></span>anuar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022)<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws230\">Amendments to IAS 37 Pr<span class=\"_ _4\"></span>ovisions<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> Contingent </span>Liabilities and Contingent Assets: Onerous Contracts \u2014 Cost of F<span class=\"_ _1\"></span>ulfilling a Contract (applicable for ann<span class=\"_ _4\"></span>ual periods beginning on or after 1 J<span class=\"_ _4\"></span>anuar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,2022)<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws231\">Amendments to IFRS 3 Business Combinations: </span>Reference to the Conceptual F<span class=\"_ _1\"></span>ramework (app<span class=\"_ _4\"></span>licable for annual periods beginning on or after 1 J<span class=\"_ _4\"></span>anuary 1,<span class=\"_ _1\"></span> 2022)<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws14b\">Annual Improvements to IFRS Standards 2018\u20132020 </span>(applicable f<span class=\"_ _4\"></span>or annual periods beginning on or after 1 Jan<span class=\"_ _4\"></span>uar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022)<span class=\"_ _1a9\"> </span>The adoption of these new standards and amendments has not led to major changes in the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s accounting policies<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Standards and Interpretations issued b<span class=\"_ _4\"></span>ut not yet effective in the current year<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The Group elected not to earl<span class=\"_ _4\"></span>y adopt the following new Standards,<span class=\"_ _1\"></span> Interpretations and Amendments,<span class=\"_ _4\"></span> whic<span class=\"_ _4\"></span>h have been issued by the IASB and the IFRS IC b<span class=\"_ _4\"></span>ut are not yet mandator<span class=\"_ _3\"></span>y for December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> reporting periods and/<span class=\"_ _1a9\"> </span>or not yet adopted b<span class=\"_ _4\"></span>y the EU as per December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws1c6\">IFRS 17 Insur<span class=\"_ _4\"></span>ance Contracts (app<span class=\"_ _4\"></span>licable for annual<span class=\"_ _1a9\"> </span></span>periods beginning on or after J<span class=\"_ _4\"></span>anuar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2023)<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws16d\">Amendments to IFRS 17 Insur<span class=\"_ _4\"></span>ance contracts: Initial<span class=\"_ _1a9\"> </span></span>Application of IFRS 17<span class=\"_ _1\"></span> and IFRS 9 \u2013 Comparative<span class=\"_ _1a9\"> </span>Information (applicab<span class=\"_ _4\"></span>le for annual periods beginning<span class=\"_ _1a9\"> </span>on or after Jan<span class=\"_ _4\"></span>uar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2023)<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws232\">Amendments to IAS 1 Presentation of F<span class=\"_ _4\"></span>inancial<span class=\"_ _1a9\"> </span></span>Statements: Classification of Liabilities as Current or<span class=\"_ _1a9\"> </span>Non-current (app<span class=\"_ _4\"></span>licable for annual periods beginning<span class=\"_ _1a9\"> </span>on or after Jan<span class=\"_ _4\"></span>uar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 202<span class=\"_ _4\"></span>4 or later<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> b<span class=\"_ _4\"></span>ut not yet endorsed<span class=\"_ _1a9\"> </span>in the EU)<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws232\">Amendments to IAS 1 Presentation of F<span class=\"_ _4\"></span>inancial<span class=\"_ _1a9\"> </span></span>Statements and IFRS Practice Statement 2: Disclosur<span class=\"_ _4\"></span>e<span class=\"_ _1a9\"> </span>of Accounting P<span class=\"_ _4\"></span>olicies (applicable f<span class=\"_ _4\"></span>or annual periods<span class=\"_ _1a9\"> </span>beginning on or after J<span class=\"_ _4\"></span>anuar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2023)<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"wsda\">Amendments to IAS 8 Accounting policies,<span class=\"_ _4\"></span> Changes<span class=\"_ _1a9\"> </span></span>in Accounting Estimates and Errors: Definition of<span class=\"_ _1a9\"> </span>Accounting Estimates (applicab<span class=\"_ _4\"></span>le for annual periods<span class=\"_ _1a9\"> </span>beginning on or after J<span class=\"_ _4\"></span>anuar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2023)<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"wsfd\">Amendments to IAS 12 Income T<span class=\"_ _1\"></span>axes: Deferred T<span class=\"_ _25\"></span>ax<span class=\"_ _1a9\"> </span></span>related to Assets and Liabilities arising from a Single<span class=\"_ _1a9\"> </span>T<span class=\"_ _25\"></span>ransaction (applicable for annual periods beginning<span class=\"_ _1a9\"> </span>on or after Jan<span class=\"_ _4\"></span>uar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2023)<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws91\">Amendments to IFRS 16 Leases: Lease Liability in a<span class=\"_ _1a9\"> </span></span>Sale and Leaseback (applicab<span class=\"_ _4\"></span>le for annual periods<span class=\"_ _1a9\"> </span>beginning on or after J<span class=\"_ _4\"></span>anuar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 202<span class=\"_ _1\"></span>4,<span class=\"_ _1\"></span> but not yet<span class=\"_ _1a9\"> </span>endorsed in the EU)<span class=\"_ _1a9\"> </span>None of the new Standards,<span class=\"_ _1\"></span> Interpretations and<span class=\"_ _1a9\"> </span>Amendments,<span class=\"_ _1\"></span> which are effective for periods beginning<span class=\"_ _1a9\"> </span>after Jan<span class=\"_ _4\"></span>uar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _1\"></span> that have been issued by the IASB<span class=\"_ _1a9\"> </span>and the IFRS IC but are not y<span class=\"_ _4\"></span>et effective as per Decembe<span class=\"_ _1a9\"> </span>31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> and/or not y<span class=\"_ _4\"></span>et adopted by the EU as per<span class=\"_ _1a9\"> </span>December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> ar<span class=\"_ _4\"></span>e expected to have a material effect<span class=\"_ _1a9\"> </span>on the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s current or future financial statements or on<span class=\"_ _1a9\"> </span>foreseeab<span class=\"_ _4\"></span>le future transactions<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.5.<span class=\"_ _3\"></span>3<span class=\"_ _3\"></span> <span class=\"_ _59\"> </span><span class=\"ls0 ws0\">Basis of pr<span class=\"_ _4\"></span>epara<span class=\"_ _4\"></span>tion and s<span class=\"_ _4\"></span>ignifica<span class=\"_ _4\"></span>nt<span class=\"_ _1a9\"> </span></span>accounti<span class=\"_ _3\"></span>ng p<span class=\"_ _3\"></span>olicie<span class=\"_ _3\"></span>s<span class=\"_ _1a9\"> </span>The main basis adopted when preparing these conso<span class=\"_ _4\"></span>lidat<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ed financial statements are set out belo<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>(A) <span class=\"_ _41\"> </span>S<span class=\"_ _4\"></span>T<span class=\"_ _25\"></span>A<span class=\"_ _25\"></span>TEMENT OF COMPLIANCE<span class=\"_ _1a9\"> </span>These consolidated financial statements w<span class=\"_ _4\"></span>ere prepar<span class=\"_ _4\"></span>ed<span class=\"_ _1a9\"> </span>in accordance with the IFRS as issued by the IASB and<span class=\"_ _1a9\"> </span>adopted by the EU<span class=\"_ _1\"></span>. The consolidated financial statements<span class=\"_ _1a9\"> </span>are presented in thousands of eur<span class=\"_ _4\"></span>o except per share<span class=\"_ _1a9\"> </span>amounts which are in eur<span class=\"_ _4\"></span>o<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>(B) <span class=\"_ _56\"> </span>GOING CONCERN - MA<span class=\"_ _25\"></span>TERIAL<span class=\"_ _1a9\"> </span>UNCERT<span class=\"_ _25\"></span>AINTY<span class=\"_ _1a9\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s cash balance at December 31<span class=\"_ _1\"></span>, 2022,<span class=\"_ _1\"></span> of 3<span class=\"_ _4\"></span>.6<span class=\"_ _1a9\"> </span>million euro is not sufficient to fund the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s operations<span class=\"_ _1a9\"> </span>during the next twelve months<span class=\"_ _4\"></span>. How<span class=\"_ _4\"></span>ever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> post-closing,<span class=\"_ _1\"></span> the<span class=\"_ _1a9\"> </span>Group entered into the A<span class=\"_ _4\"></span>tlas Subscription Agreement.<span class=\"ws0\"> </span>This committed but conditional funding w<span class=\"_ _4\"></span>ould be <span class=\"_ _106\"></span><span class=\"ws0\"> </span>sufficient to fund operations during the next tw<span class=\"_ _4\"></span>elve months<span class=\"_ _1a9\"> </span>from the financial statement\u2019<span class=\"_ _1\"></span>s issue date. Ho<span class=\"_ _4\"></span>wever<span class=\"_ _1\"></span>,<span class=\"_ _1\"></span> given<span class=\"_ _1a9\"> </span>the contingent nature of this funding,<span class=\"_ _4\"></span> the Group is actively<span class=\"_ _1a9\"> </span>exploring the possibility of obtaining additional funding<span class=\"_ _1a9\"> </span>through debt,<span class=\"_ _4\"></span> equity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> or non-dilutive funding,<span class=\"_ _1\"></span> including the<span class=\"_ _1a9\"> </span>licensing of THR-149<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> or alternatively r<span class=\"_ _4\"></span>educing its costs<span class=\"_ _1a9\"> </span>and investments so that there should be sufficient cash<span class=\"_ _1a9\"> </span>to continue its operations during the next tw<span class=\"_ _4\"></span>elve months.<span class=\"_ _1a9\"> </span>As the net-assets of the Company ar<span class=\"_ _4\"></span>e below 61<span class=\"_ _1\"></span>,500<span class=\"_ _1a9\"> </span>euro (the statutor<span class=\"_ _3\"></span>y minimum amount of share capital of<span class=\"_ _1a9\"> </span>a Belgian public limited liability compan<span class=\"_ _4\"></span>y)<span class=\"_ _1\"></span>, in accordance<span class=\"_ _1a9\"> </span>with article 7:229 of the BCCA,<span class=\"_ _4\"></span> each inter<span class=\"_ _4\"></span>ested party is<span class=\"_ _1a9\"> </span>entitled to request the competent commercial court to<span class=\"_ _1a9\"> </span>dissolve the Company<span class=\"_ _25\"></span>. In such instance the court may<span class=\"_ _1a9\"> </span>order the dissolution of the Compan<span class=\"_ _4\"></span>y or grant a grace<span class=\"_ _1a9\"> </span>period within which the Compan<span class=\"_ _4\"></span>y is allow<span class=\"_ _4\"></span>ed to remedy<span class=\"_ _1a9\"> </span>the situation<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>Based on the above<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the Board of Directors considers it may be reasonable to expect that ther<span class=\"_ _4\"></span>e will be sufficient cash to continue its operations during the next tw<span class=\"_ _4\"></span>elve months,<span class=\"_ _1\"></span> and therefore decided to continue its valuation rules under the assumption of going concern. Ho<span class=\"_ _4\"></span>wever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> there is a material uncertainty relating to going concern of the Group because it is uncertain that the above-men<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tioned committed but conditional funding will be availab<span class=\"_ _4\"></span>le when needed given the conditions related to the funding,<span class=\"_ _4\"></span> and because it is not certain whether the Group will be able to timely obtain the necessary additional funding through debt,<span class=\"_ _4\"></span> equity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> or non-dilutive funding,<span class=\"_ _1\"></span> par<span class=\"_ _3\"></span>tnering or to realize sufficient cost and investment r<span class=\"_ _4\"></span>eductions<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>(<span class=\"_ _1a9\"> </span>C) <span class=\"_ _35\"> </span>BASIS OF CONSOLIDA<span class=\"_ _25\"></span>TION<span class=\"_ _1a9\"> </span>Subsidiaries<span class=\"_ _1a9\"> </span>The consolidated financial statements inc<span class=\"_ _4\"></span>lude all the entities that are controlled b<span class=\"_ _4\"></span>y the Group<span class=\"_ _1\"></span>. Control exists when Oxurion directly or indir<span class=\"_ _4\"></span>ectly has the ability to direct the relevant activities that significantly affect the entities<span class=\"_ _1\"></span>\u2019 returns,<span class=\"_ _1\"></span> has exposure or rights to variable returns and the ability to use its pow<span class=\"_ _4\"></span>er over the entity to affect in<span class=\"_ _4\"></span>vestors<span class=\"_ _4\"></span>\u2019 returns,<span class=\"_ _1\"></span> Control is presumed to exist when Oxurion o<span class=\"_ _4\"></span>wns,<span class=\"_ _1\"></span> directly or indir<span class=\"_ _4\"></span>ectly<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> more than 50 percent of the voting rights linked to the share capital. The existence and eff<span class=\"_ _4\"></span>ect of potential voting rights that are curr<span class=\"_ _4\"></span>ently exercisable or convertible are considered when assessing whether the Group controls another entity<span class=\"_ _25\"></span>. Applying this standar<span class=\"_ _4\"></span>d<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s subsidiaries ThromboGenics and Oncurious have been consolidated<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Subsidiaries are fully consolidated fr<span class=\"_ _4\"></span>om the date on which control is transf<span class=\"_ _4\"></span>erred to the Group<span class=\"_ _1\"></span>. They are deconsolidat<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ed from the date on which contro<span class=\"_ _4\"></span>l ceases. A c<span class=\"_ _4\"></span>hange in the ownership inter<span class=\"_ _4\"></span>est of a subsidiar<span class=\"_ _3\"></span>y<span class=\"_ _25\"></span>, without a c<span class=\"_ _4\"></span>hange in control,<span class=\"_ _4\"></span> is accounted for as an equity tr<span class=\"_ _4\"></span>ansaction. Cash flows fr<span class=\"_ _4\"></span>om transactions relating to c<span class=\"_ _4\"></span>hanges in ownership that do not result in a change of contr<span class=\"_ _4\"></span>ol are classifi<span class=\"_ _4\"></span>ed as financing activities.<span class=\"_ _1a9\"> </span>Intra-group tr<span class=\"_ _4\"></span>ansactions,<span class=\"_ _1\"></span> balances and unrealized profits and losses on transactions betw<span class=\"_ _4\"></span>een companies in the Group are eliminated in pr<span class=\"_ _4\"></span>eparing the consolidated financial statements. Unr<span class=\"_ _4\"></span>ealized losses are eliminated in the same way as unr<span class=\"_ _4\"></span>ealized profits unless the transaction indicates an impairment loss on the assets transferr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>. The accounting principles of the subsidiaries ha<span class=\"_ _4\"></span>ve been adjusted where necessar<span class=\"_ _3\"></span>y to be consistent with the princi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ples adopted b<span class=\"_ _4\"></span>y the Group<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>(<span class=\"_ _1a9\"> </span>D) <span class=\"_ _41\"> </span>BUSINESS COMBINA<span class=\"_ _25\"></span>TIONS AND GOODWILL<span class=\"_ _1a9\"> </span>Business combinations are accounted for b<span class=\"_ _4\"></span>y applying the acquisition method<span class=\"_ _4\"></span>. The cost of an acquisition is measured as the aggregate of the consideration trans<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ferred as measur<span class=\"_ _4\"></span>ed at fair value on the acquisition date and the amount of any non-contro<span class=\"_ _4\"></span>lling interests in the acquiree<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or each business combination,<span class=\"_ _1\"></span> the Company elects whether to measure the non-controlling inter<span class=\"_ _4\"></span>ests in the acquiree at fair value or at the proportionate share of the acquiree\u2019<span class=\"_ _1\"></span>s identifiable net assets<span class=\"_ _4\"></span>. Acquisition-r<span class=\"_ _4\"></span>elated costs are expensed as incurr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>. The cost is attrib<span class=\"_ _4\"></span>uted to the identifiable assets<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> liabilities and contingent liabilities of the acquiree<span class=\"_ _4\"></span>. These acquired identifi<span class=\"_ _4\"></span>able assets and (con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tingent) liabilities are initially measur<span class=\"_ _4\"></span>ed at their fair value on the date of acquisition.<span class=\"_ _1a9\"> </span>Goodwill is initially measured at cost (being the excess of the aggregate of the consideration transferr<span class=\"_ _4\"></span>ed and the amount recognized for non-contro<span class=\"_ _4\"></span>lling interests) and any previous interest held o<span class=\"_ _4\"></span>ver the identifiab<span class=\"_ _4\"></span>le assets acquired and liabilities assumed<span class=\"_ _4\"></span>. If the fair value of the net assets acquired is in excess of the aggregate consideration trans<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ferred<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the Company r<span class=\"_ _4\"></span>e-assesses whether it has correctly identified all of the assets acquired and all of the liabilities assumed and reviews the procedur<span class=\"_ _4\"></span>es used to measure the amounts to be recognized at the acquisition date<span class=\"_ _4\"></span>. If the reassessment still results in an excess of the f<span class=\"_ _4\"></span>air value of net assets acquired o<span class=\"_ _4\"></span>ver the aggregate consideration transferr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> then the gain is recognized in the profit or loss<span class=\"_ _1a9\"> </span>. (E) <span class=\"_ _74\"> </span>FOREIGN CURRENCY TRANSLA<span class=\"_ _25\"></span>TION<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>unctional and presentation currency<span class=\"_ _1a9\"> </span>The consolidated financial statements ar<span class=\"_ _4\"></span>e presented in<span class=\"_ _1a9\"> </span>thousands of euro<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> which is the functional currency of<span class=\"_ _1a9\"> </span>Oxurion. All companies within the Group use the euro<span class=\"_ _1a9\"> </span>as their functional currency<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> except for the US subsidiary<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> whose functional currency is the US dollar (USD)<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>T<span class=\"_ _1\"></span>ransactions and balances in for<span class=\"_ _4\"></span>eign currencies<span class=\"_ _1a9\"> </span>T<span class=\"_ _25\"></span>ransactions in currencies other than the functional<span class=\"_ _1a9\"> </span>currency of the entities ar<span class=\"_ _4\"></span>e recorded at the exc<span class=\"_ _4\"></span>hange rates<span class=\"_ _1a9\"> </span>prevailing on the date of the transaction. On eac<span class=\"_ _4\"></span>h balance<span class=\"_ _1a9\"> </span>sheet date,<span class=\"_ _1\"></span> monetar<span class=\"_ _3\"></span>y assets and liabilities denominated<span class=\"_ _1a9\"> </span>in foreign curr<span class=\"_ _4\"></span>encies are translated into the functional<span class=\"_ _1a9\"> </span>currency at the exc<span class=\"_ _4\"></span>hange rates prevailing on the balance<span class=\"_ _1a9\"> </span>sheet date.<span class=\"_ _1a9\"> </span>Non-monetar<span class=\"_ _3\"></span>y assets and liabilities that are measured<span class=\"_ _1a9\"> </span>at historical cost in a foreign curr<span class=\"_ _4\"></span>ency by the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s<span class=\"_ _1a9\"> </span>entities are translated using the exc<span class=\"_ _4\"></span>hange rates at the<span class=\"_ _1a9\"> </span>dates of the initial transactions<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Gains and losses arising on retranslation using a f<span class=\"_ _4\"></span>oreign<span class=\"_ _1a9\"> </span>currency ar<span class=\"_ _4\"></span>e included in the net profit or loss for the period<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>oreign operations<span class=\"_ _1a9\"> </span>On consolidation,<span class=\"_ _4\"></span> the assets and liabilities inc<span class=\"_ _4\"></span>luding<span class=\"_ _1a9\"> </span>goodwill and fair value adjustments arising on consoli<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>dation of the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s foreign operations are tr<span class=\"_ _4\"></span>anslated at<span class=\"_ _1a9\"> </span>the exchange rates pr<span class=\"_ _4\"></span>evailing on the balance sheet date.<span class=\"_ _1a9\"> </span>Income and expense items are translated at the a<span class=\"_ _4\"></span>verage<span class=\"_ _1a9\"> </span>exchange rates f<span class=\"_ _4\"></span>or the period<span class=\"_ _4\"></span>. Exchange r<span class=\"_ _4\"></span>ate differences<span class=\"_ _1a9\"> </span>arising,<span class=\"_ _4\"></span> if any<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> ar<span class=\"_ _4\"></span>e classified as equity and tr<span class=\"_ _4\"></span>ansferred to the<span class=\"_ _1a9\"> </span>Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s translation reser<span class=\"_ _3\"></span>ve. Such tr<span class=\"_ _4\"></span>anslation differences<span class=\"_ _1a9\"> </span>are recognized as income or expense items in the period<span class=\"_ _1a9\"> </span>in which the operation is disposed of<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>(F) <span class=\"_ _74\"> </span>REVENUE RECOGNITION<span class=\"_ _1a9\"> </span>Revenue recognition for Oxurion consists of JETREA\u00ae via<span class=\"_ _1a9\"> </span>l<span class=\"_ _1a9\"> </span>sales to distributors<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> ro<span class=\"_ _4\"></span>yalties for JETREA\u00ae vial sales fro<span class=\"_ _1a9\"> </span>m<span class=\"_ _1a9\"> </span>licensees,<span class=\"_ _1\"></span> occasional upfront and milestone payments<span class=\"_ _1a9\"> </span>agreed through license or collabor<span class=\"_ _4\"></span>ation contracts whic<span class=\"_ _1a9\"> </span>h<span class=\"_ _1a9\"> </span>could include rec<span class=\"_ _4\"></span>harging of incurr<span class=\"_ _4\"></span>ed ser<span class=\"_ _3\"></span>vices of cost,<span class=\"_ _4\"></span> an<span class=\"_ _1a9\"> </span>d<span class=\"_ _1a9\"> </span>royalties<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>JETREA\u00ae sales<span class=\"_ _1a9\"> </span>Performance obligations<span class=\"_ _1a9\"> </span>Oxurion has identified one performance obligation withi<span class=\"_ _1a9\"> </span>n<span class=\"_ _1a9\"> </span>its customer contracts for the sale of JETREA\u00ae product,<span class=\"_ _1\"></span> i.e<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>the deliver<span class=\"_ _3\"></span>y of goods to its customers.<span class=\"_ _1a9\"> </span>Timing of reven<span class=\"_ _4\"></span>ue recognition<span class=\"_ _1a9\"> </span>Oxurion recognizes reven<span class=\"_ _4\"></span>ue upon deliver<span class=\"_ _3\"></span>y of the goods to<span class=\"_ _1a9\"> </span>the customers as that is the moment the customer obtains<span class=\"_ _1a9\"> </span>control o<span class=\"_ _4\"></span>ver the goods.<span class=\"_ _1a9\"> </span>T<span class=\"_ _1\"></span>ransaction price \u2013 variab<span class=\"_ _4\"></span>le consideration<span class=\"_ _1a9\"> </span>The variable consider<span class=\"_ _4\"></span>ation is estimated at contrac<span class=\"_ _1a9\"> </span>t<span class=\"_ _1a9\"> </span>inception and constrained until it is highly probab<span class=\"_ _4\"></span>le that a<span class=\"_ _1a9\"> </span>significant revenue r<span class=\"_ _4\"></span>eversal in the amount of cumulativ<span class=\"_ _1a9\"> </span>e<span class=\"_ _1a9\"> </span>revenue r<span class=\"_ _4\"></span>ecognized will not occur when the associated<span class=\"_ _1a9\"> </span>uncertainty with the variable consideration is subsequent<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ly resolved<span class=\"_ _1\"></span>. The sales prices are fixed in the contract<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>How<span class=\"_ _4\"></span>ever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> some contracts pro<span class=\"_ _4\"></span>vide customers with a righ<span class=\"_ _1a9\"> </span>t<span class=\"_ _1a9\"> </span>of return and rebates<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Oxurion accepts returns in certain limited cases,<span class=\"_ _4\"></span> and the<span class=\"_ _1a9\"> </span>y<span class=\"_ _1a9\"> </span>need to be approved b<span class=\"_ _4\"></span>y Oxurion in order to be processe<span class=\"_ _1a9\"> </span>d<span class=\"_ _1a9\"> </span>by the distrib<span class=\"_ _4\"></span>utors. T<span class=\"_ _4\"></span>he amount of revenue r<span class=\"_ _4\"></span>ecognized is<span class=\"_ _1a9\"> </span>the amount allocated to the satisfied performance ob<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ligation taking into account variable consideration (inc<span class=\"_ _4\"></span>l.<span class=\"_ _1a9\"> </span>expected returns)<span class=\"_ _1\"></span>. The estimated amount of variable con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>sideration is included in the tr<span class=\"_ _4\"></span>ansaction price only to th<span class=\"_ _1a9\"> </span>e<span class=\"_ _1a9\"> </span>extent that it is highly probable that a significant r<span class=\"_ _4\"></span>eversal in the amount of cumulative revenue r<span class=\"_ _4\"></span>ecognized will not occur and is estimated on the basis of historical experi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ence and the specific terms in the individual agreements<span class=\"_ _4\"></span>. A liability is recognized for expected sales r<span class=\"_ _4\"></span>eturns,<span class=\"_ _1\"></span> rebates,<span class=\"_ _4\"></span> trade and cash discounts,<span class=\"_ _1\"></span> chargebacks or other r<span class=\"_ _4\"></span>eimburse<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments payable directl<span class=\"_ _4\"></span>y or indirectly to customers in r<span class=\"_ _4\"></span>elation to sales made until the end of the reporting period<span class=\"_ _4\"></span>. Oxurion applies the \u2018expected value method<span class=\"_ _1\"></span>\u2019 in order to estimate such return accr<span class=\"_ _4\"></span>uals,<span class=\"_ _1\"></span> and related asset. Oxurion does not offer war<span class=\"_ _4\"></span>ranties,<span class=\"_ _1\"></span> customer loyalty point programs or an<span class=\"_ _4\"></span>y material financing component to its customers<span class=\"_ _4\"></span>. Oxurion has not received any non-cash consid<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>eration. Ther<span class=\"_ _4\"></span>e are no costs to acquire customer contr<span class=\"_ _4\"></span>acts,<span class=\"_ _1\"></span> or costs to fulfil the customer contracts<span class=\"_ _4\"></span>. Ther<span class=\"_ _4\"></span>efore<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> contract balances are only r<span class=\"_ _4\"></span>ecognized to the extent of accounts re-<span class=\"_ _1a9\"> </span>ceivable<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and r<span class=\"_ _4\"></span>efund liability (return accrual)<span class=\"_ _1\"></span>. Royalty r<span class=\"_ _4\"></span>evenue on JETREA\u00ae sales<span class=\"_ _1a9\"> </span>In the case of one distributor<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> ro<span class=\"_ _4\"></span>yalties are gener<span class=\"_ _4\"></span>ated under license agreements based on licensee\u2019<span class=\"_ _1\"></span>s sales of JETREA\u00ae products to the end-customers<span class=\"_ _4\"></span>. As explained above<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> revenue from the sale of goods is recognized at the moment of deliver<span class=\"_ _3\"></span>y to the distributor<span class=\"_ _1\"></span>. However<span class=\"_ _25\"></span>, the agreement stipulates that the ro<span class=\"_ _4\"></span>yalty is earned once the distributor subsequently sells the product to the end-cus<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tomer<span class=\"_ _1\"></span>. Therefor<span class=\"_ _4\"></span>e,<span class=\"_ _1\"></span> the royalty revenue <span class=\"_ _4\"></span>is recognized once the product is sold to the end-customer<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> based on quarterly invoicing data. Ther<span class=\"_ _4\"></span>e is no specific performance obligation for Oxurion to satisfy in order to be entitled to this ro<span class=\"_ _4\"></span>yalty<span class=\"_ _25\"></span>. Occasional upfront,<span class=\"_ _4\"></span> milestone and other payments<span class=\"_ _1a9\"> </span>Revenue is only recognized at an amount that r<span class=\"_ _4\"></span>eflects the consideration to which the Gr<span class=\"_ _4\"></span>oup expects to be entitled in exchange for the satisfied performance obligation. A performance obligation is satisfied when the control of goods or ser<span class=\"_ _3\"></span>vices is transferr<span class=\"_ _4\"></span>ed to a customer<span class=\"_ _1\"></span>. Any upfront payments or license fees for which ther<span class=\"_ _4\"></span>e are subsequent performance obligations,<span class=\"_ _4\"></span> ar<span class=\"_ _4\"></span>e initially reported as deferred revenue and ar<span class=\"_ _4\"></span>e recognized as revenue when perfor<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mance obligations are satisfi<span class=\"_ _4\"></span>ed over the period of the de<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>velopment,<span class=\"_ _4\"></span> collabor<span class=\"_ _4\"></span>ation,<span class=\"_ _4\"></span> or manufacturing ob<span class=\"_ _4\"></span>ligation. W<span class=\"_ _4\"></span>e refer to note 5<span class=\"_ _1\"></span>.8 under key arrangements section<span class=\"_ _1a9\"> </span>..<span class=\"_ _1a9\"> </span>(<span class=\"_ _1a9\"> </span>G) <span class=\"_ _35\"> </span>RESEARCH GRANTS<span class=\"_ _1a9\"> </span>On certain specific research projects,<span class=\"_ _1\"></span> the research costs incurred ar<span class=\"_ _4\"></span>e partially reimbursed by Flander<span class=\"_ _4\"></span>s Innovation &amp; Entrepreneur<span class=\"_ _4\"></span>ship (Vlaams Instituut Innover<span class=\"_ _4\"></span>en en Ondernemen) (<span class=\"ff3 ws0\">\u201cVLAIO\u201d</span>)<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> formerly known as IWT (Agency for Innovation b<span class=\"_ _4\"></span>y Science and T<span class=\"_ _25\"></span>echnolog<span class=\"_ _3\"></span>y in Flanders \u2013 Agentschap voor Inno<span class=\"_ _4\"></span>vatie door W<span class=\"_ _4\"></span>etenschap en T<span class=\"_ _25\"></span>echnologie in Vlaanderen)<span class=\"_ _1\"></span>. In line with IAS 20 \u201cGovernment gr<span class=\"_ _4\"></span>ants<span class=\"_ _4\"></span>\u201d,<span class=\"_ _4\"></span> these gr<span class=\"_ _4\"></span>ants are recognized as government gr<span class=\"_ _4\"></span>ant income over the term of the pr<span class=\"_ _4\"></span>oject for which the gr<span class=\"_ _4\"></span>ant was given when ther<span class=\"_ _4\"></span>e is reasonable assurance that the Group will comp<span class=\"_ _4\"></span>ly with the conditions attached to them and the grants will be r<span class=\"_ _4\"></span>eceived<span class=\"_ _4\"></span>. Gr<span class=\"_ _4\"></span>ants that compensate the Company for expenses incur<span class=\"_ _4\"></span>red are deducted from the \u2018Research and Development Expenses<span class=\"_ _1\"></span>\u2019 on a systematic basis in the same period in which the expenses are incurr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Oxurion has a track r<span class=\"_ _4\"></span>ecord of more than 10 y<span class=\"_ _4\"></span>ears with these types of projects for which it r<span class=\"_ _4\"></span>eceives grants from VLAIO<span class=\"_ _25\"></span>. Grants are pr<span class=\"_ _4\"></span>ovided to Oxurion in order to support certain R&amp;D activities. A<span class=\"_ _4\"></span>ctivities,<span class=\"_ _1\"></span> related budget,<span class=\"_ _4\"></span> and types of costs that will be paid are defined in the grant agr<span class=\"_ _4\"></span>eement. Over the course of the project,<span class=\"_ _1\"></span> Oxurion repor<span class=\"_ _3\"></span>ts on the status of activities and incurred expenditur<span class=\"_ _4\"></span>e to VLAIO on a regular (quarterly) basis in order to receive grant advances<span class=\"_ _4\"></span>. The final assessment is performed by VLAIO at the end of the project in order to determine the final grant amount. Projects can take on aver<span class=\"_ _4\"></span>age between tw<span class=\"_ _4\"></span>o to five years<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Over the course of funded projects,<span class=\"_ _1\"></span> Oxurion is confident that all activities performed will not deviate from the agreed scope,<span class=\"_ _1\"></span> and that the final grant amount will not deviate from the initially agreed amount (except in a limited number o<span class=\"_ _1a9\"> </span>cases when Oxurion had finalized the project earlier and did<span class=\"_ _1a9\"> </span>not spend the whole budget b<span class=\"_ _4\"></span>ut has still received the grant<span class=\"_ _1a9\"> </span>based on actual expenditure)<span class=\"_ _1\"></span>. Overall, Oxurion is confident<span class=\"_ _1a9\"> </span>that the reasonable assur<span class=\"_ _4\"></span>ance as defined in the standard<span class=\"_ _1a9\"> </span>is reached o<span class=\"_ _4\"></span>ver the course of the project for the amounts<span class=\"_ _1a9\"> </span>spent up to that moment,<span class=\"_ _4\"></span> as the only condition attac<span class=\"_ _4\"></span>hed<span class=\"_ _1a9\"> </span>to the grant is to perform R&amp;D activities in line with the<span class=\"_ _1a9\"> </span>agreed-upon scope and in line with the set budget. T<span class=\"_ _4\"></span>here<span class=\"_ _1a9\"> </span>are no other conditions attached to the gr<span class=\"_ _4\"></span>ants and the<span class=\"_ _1a9\"> </span>outcome of R&amp;D activities does not impact the decision<span class=\"_ _1a9\"> </span>of VLAIO whether the final grant will be received or not.<span class=\"_ _1a9\"> </span>(H) <span class=\"_ _35\"> </span>INT<span class=\"_ _25\"></span>ANGIBLE ASSETS<span class=\"_ _1a9\"> </span>Internally generated intangib<span class=\"_ _4\"></span>le assets<span class=\"_ _1a9\"> </span>Research costs ar<span class=\"_ _4\"></span>e charged to statement of profit and loss<span class=\"_ _1a9\"> </span>as incurred<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>An internally generated intangib<span class=\"_ _4\"></span>le fixed asset (see note<span class=\"_ _1a9\"> </span>5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.3) which arises from development activities undertak<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>en in the Group is recognized only if all <span class=\"_ _4\"></span>of the following<span class=\"_ _1a9\"> </span>conditions are met:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws241\">T<span class=\"_ _1\"></span>echnical possibility of making the intangible asset<span class=\"_ _1a9\"> </span></span>ready for use<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"wscf\">The intention is to complete the intangible asset and<span class=\"_ _1a9\"> </span></span>use or sell it.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Possibility of using or selling the intangible asset.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws24\">It is probable that the intangible asset will generate<span class=\"_ _1a9\"> </span></span>future economic benefit or demonstrate the existence<span class=\"_ _1a9\"> </span>of a market.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws242\">Availability of adequate tec<span class=\"_ _4\"></span>hnical and financial<span class=\"_ _1a9\"> </span></span>resources to comp<span class=\"_ _4\"></span>lete the development; and<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws199\">Availability to r<span class=\"_ _4\"></span>eliably measur<span class=\"_ _4\"></span>e the attributed expenses<span class=\"_ _1a9\"> </span></span>for the intangible asset during development.<span class=\"_ _1a9\"> </span>The patent costs for protecting the intang<span class=\"_ _4\"></span>ible assets are<span class=\"_ _1a9\"> </span>recognized as an expense<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Where the criteria for capitalization of the development<span class=\"_ _1a9\"> </span>expenses are not met,<span class=\"_ _1\"></span> these expenses are recorded as<span class=\"_ _1a9\"> </span>incurred during the period<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>After their initial recording on the statement of financial<span class=\"_ _1a9\"> </span>position intangible assets ar<span class=\"_ _4\"></span>e valued at cost less accumu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lated depreciation and accumulated impairment losses<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Amortization of capitalized development costs are recog<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>nized in the statement of profit and loss under \u2018Research<span class=\"_ _1a9\"> </span>and Development Expenses<span class=\"_ _4\"></span>\u2019. W<span class=\"_ _4\"></span>e r<span class=\"_ _4\"></span>efer to note 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.3 on<span class=\"_ _1a9\"> </span>\u2018Research and Development Expenses<span class=\"_ _1\"></span>\u2019.<span class=\"_ _1a9\"> </span>The capitalized costs of the patent are amortized over the<span class=\"_ _1a9\"> </span>life of the patent as of the moment that it would gener<span class=\"_ _4\"></span>ate<span class=\"_ _1a9\"> </span>revenue<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Softwar<span class=\"_ _4\"></span>e licenses are amortized over three y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Externally acquired intangib<span class=\"_ _4\"></span>le assets and outsourced<span class=\"_ _1a9\"> </span>R&amp;D costs<span class=\"_ _1a9\"> </span>Payments made to thir<span class=\"_ _4\"></span>d parties for subcontracted R&amp;D<span class=\"_ _25\"></span>,<span class=\"_ _1a9\"> </span>where there is no tr<span class=\"_ _4\"></span>ansfer of intellectual property to<span class=\"_ _1a9\"> </span>Oxurion,<span class=\"_ _4\"></span> are expensed as internal R&amp;D expenses in the<span class=\"_ _1a9\"> </span>period in which they are incur<span class=\"_ _4\"></span>red<span class=\"_ _1\"></span>. Such payments are only<span class=\"_ _1a9\"> </span>capitalized if they meet the criteria for recognition of an<span class=\"_ _1a9\"> </span>internally generated intangib<span class=\"_ _4\"></span>le asset,<span class=\"_ _4\"></span> as indicated abo<span class=\"_ _4\"></span>ve.<span class=\"_ _1a9\"> </span>Oxurion has entered into various contracts f<span class=\"_ _4\"></span>or the ac<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>quisition of licenses to intellectual property or third-par<span class=\"_ _3\"></span>ty<span class=\"_ _1a9\"> </span>know-ho<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> as disc<span class=\"_ _4\"></span>losed further in note 5<span class=\"_ _4\"></span>.8 under the key<span class=\"_ _1a9\"> </span>arrangements section. T<span class=\"_ _4\"></span>hese assets are typically acquired<span class=\"_ _1a9\"> </span>for consideration inc<span class=\"_ _4\"></span>luding upfront,<span class=\"_ _4\"></span> milestone and ro<span class=\"_ _4\"></span>yalty<span class=\"_ _1a9\"> </span>payments.<span class=\"_ _1a9\"> </span>Upfront payments made to third parties to in-license or<span class=\"_ _1a9\"> </span>acquire intellectual property rights,<span class=\"_ _4\"></span> patents<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> compounds,<span class=\"_ _1\"></span> products,<span class=\"_ _1\"></span> and know-how tec<span class=\"_ _4\"></span>hnologies to be used in R&amp;D<span class=\"_ _1a9\"> </span>activities,<span class=\"_ _1\"></span> are capitalized as costs paid for a separately<span class=\"_ _1a9\"> </span>acquired intangib<span class=\"_ _4\"></span>le asset under IAS 38<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The related milestone payments can onl<span class=\"_ _4\"></span>y be capi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>talized if they meet the criteria for recognition of an <span class=\"_ _33\"></span><span class=\"ws0\"> </span>internally generated intangib<span class=\"_ _4\"></span>le asset and is recognized at<span class=\"_ _1a9\"> </span>the moment the milestone is achieved<span class=\"_ _1a9\"> </span>Royalties paid/payab<span class=\"_ _4\"></span>le for acquired intellectual property<span class=\"_ _1a9\"> </span>are accrued for in line with the <span class=\"_ _4\"></span>underlying sales and recog<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>nized under the cost of sales<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>(I) <span class=\"_ _38\"> </span>PROPERTY<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> PLANT AND EQUIPMENT<span class=\"_ _1a9\"> </span>Property<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> p<span class=\"_ _4\"></span>lant,<span class=\"_ _4\"></span> and equipment are inc<span class=\"_ _4\"></span>luded at the histor<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ical cost (material costs only) less accumulated depreci<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ation and impairment. Subsequent costs are included in<span class=\"_ _1a9\"> </span>the carr<span class=\"_ _3\"></span>ying amount for the asset or booked as a separate<span class=\"_ _1a9\"> </span>asset as appropriate<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> but onl<span class=\"_ _4\"></span>y when it is probable that<span class=\"_ _1a9\"> </span>future economic benefits associated with the item will be<span class=\"_ _1a9\"> </span>generated for the Group and the cost price of the item can<span class=\"_ _1a9\"> </span>be measured reliab<span class=\"_ _4\"></span>ly<span class=\"_ _25\"></span>. All other repair and maintenance<span class=\"_ _1a9\"> </span>costs are char<span class=\"_ _4\"></span>ged to the statement of profit and loss as<span class=\"_ _1a9\"> </span>incurred<span class=\"_ _1\"></span>. The cost of assets retired or otherwise disposed<span class=\"_ _1a9\"> </span>of<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> and the related accumulated depr<span class=\"_ _4\"></span>eciation,<span class=\"_ _4\"></span> are inc<span class=\"_ _4\"></span>luded<span class=\"_ _1a9\"> </span>in the statement of profit and loss as part of the gain or<span class=\"_ _1a9\"> </span>loss on disposal in the year of disposal. Gains and losses<span class=\"_ _1a9\"> </span>on disposal of property<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> p<span class=\"_ _4\"></span>lant and equipment are included<span class=\"_ _1a9\"> </span>in other income or expense.<span class=\"_ _1a9\"> </span>Depreciation is calculated using the straight-line method to<span class=\"_ _1a9\"> </span>allocate the cost of property<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> p<span class=\"_ _4\"></span>lant and equipment to their<span class=\"_ _1a9\"> </span>estimated residual values o<span class=\"_ _4\"></span>ver their estimated useful lives<span class=\"_ _1a9\"> </span>as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Proper<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>, p<span class=\"_ _4\"></span>lant and equipment: three to five y<span class=\"_ _4\"></span>ears<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>F<span class=\"_ _4\"></span>urniture and fittings: thr<span class=\"_ _4\"></span>ee to five years<span class=\"_ _1a9\"> </span>The depreciation methods<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> useful life and r<span class=\"_ _4\"></span>esidual value<span class=\"_ _1a9\"> </span>are revalued on eac<span class=\"_ _4\"></span>h reporting date.<span class=\"_ _1a9\"> </span>W<span class=\"_ _4\"></span>e refer to the notes 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.3 until 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.5 for the disclosures<span class=\"_ _1a9\"> </span>of where the depreciation c<span class=\"_ _4\"></span>harges are r<span class=\"_ _4\"></span>ecognized in the<span class=\"_ _1a9\"> </span>statement of profit and loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Subsequent costs<span class=\"_ _1a9\"> </span>The cost of rep<span class=\"_ _4\"></span>lacing part of an item of proper<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>, p<span class=\"_ _4\"></span>lant<span class=\"_ _1a9\"> </span>and equipment is recognized in the carrying amount of<span class=\"_ _1a9\"> </span>the item if it is probable that the futur<span class=\"_ _4\"></span>e economic benefits<span class=\"_ _1a9\"> </span>embodied within the item replaced will fl<span class=\"_ _4\"></span>ow to the Group<span class=\"_ _1a9\"> </span>and its cost can be measured reliab<span class=\"_ _4\"></span>ly<span class=\"_ _25\"></span>. The carr<span class=\"_ _3\"></span>ying amount<span class=\"_ _1a9\"> </span>of the replaced item is der<span class=\"_ _4\"></span>ecognized<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he costs of the day-<span class=\"_ _1a9\"> </span>to-day ser<span class=\"_ _3\"></span>vicing of proper<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> plant and equipment are r<span class=\"_ _4\"></span>ec<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ognized in profit or loss as incurred<span class=\"_ _1a9\"> </span><span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>(J) <span class=\"_ _31\"> </span>LEASED ASSETS<span class=\"_ _1a9\"> </span>IFRS 16<span class=\"_ _1a9\"> </span>The Group leases an office<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> copiers,<span class=\"_ _4\"></span> and cars<span class=\"_ _4\"></span>. Rental<span class=\"_ _1a9\"> </span>contracts are typicall<span class=\"_ _4\"></span>y made for fixed periods of 3 to 4<span class=\"_ _1a9\"> </span>years b<span class=\"_ _4\"></span>ut may have extension options as described belo<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Lease terms are negotiated on an individual basis and<span class=\"_ _1a9\"> </span>contain a wide range of differ<span class=\"_ _4\"></span>ent terms and conditions.<span class=\"_ _1a9\"> </span>The lease agreements do not impose an<span class=\"_ _4\"></span>y co<span class=\"_ _4\"></span>venants,<span class=\"_ _1\"></span> but<span class=\"_ _1a9\"> </span>leased assets may not be used as security for borro<span class=\"_ _4\"></span>wing<span class=\"_ _1a9\"> </span>purposes<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Leases are recognized as right-of-use assets and a cor<span class=\"_ _25\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>responding liability at the date at which the leased asset<span class=\"_ _1a9\"> </span>is available f<span class=\"_ _4\"></span>or use by the Group<span class=\"_ _1\"></span>. Each lease payment<span class=\"_ _1a9\"> </span>is allocated between the liability and finance cost. T<span class=\"_ _4\"></span>he<span class=\"_ _1a9\"> </span>finance cost is charged to profit or loss o<span class=\"_ _4\"></span>ver the lease<span class=\"_ _1a9\"> </span>period so as to produce a constant periodic rate of inter<span class=\"_ _4\"></span>est<span class=\"_ _1a9\"> </span>on the remaining balance of the liability for eac<span class=\"_ _4\"></span>h period<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The right-of-use asset is depreciated o<span class=\"_ _4\"></span>ver the shorter of<span class=\"_ _1a9\"> </span>these asset\u2019<span class=\"_ _1\"></span>s useful life and the lease term on a straight-<span class=\"_ _1a9\"> </span>line basis<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>Assets and liabilities arising from a lease are initially<span class=\"_ _1a9\"> </span>measured on a present value basis<span class=\"_ _4\"></span>. Lease liabilities are<span class=\"_ _1a9\"> </span>exclusively composed of fixed payments less an<span class=\"_ _4\"></span>y lease<span class=\"_ _1a9\"> </span>incentives receivable<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The lease payments are discounted using the lessee\u2019<span class=\"_ _25\"></span>s in<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>there are separ<span class=\"_ _4\"></span>ately identifiab<span class=\"_ _4\"></span>le cash flows (cash-gener<span class=\"_ _4\"></span>at<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cremental borro<span class=\"_ _4\"></span>wing rate<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> being the rate that the lessee<span class=\"_ _1a9\"> </span> ing units)<span class=\"_ _4\"></span>. The impairment loss is allocated fir<span class=\"_ _4\"></span>st to reduce<span class=\"_ _1a9\"> </span> would ha<span class=\"_ _4\"></span>ve to pay to borrow the funds necessary to obtain<span class=\"_ _1a9\"> </span> the carr<span class=\"_ _3\"></span>ying amount of any goodwill allocated to the<span class=\"_ _1a9\"> </span> an asset of similar value in a similar economic environ<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cash-generating unit pro r<span class=\"_ _4\"></span>ata to the carr<span class=\"_ _3\"></span>ying amount of<span class=\"_ _1a9\"> </span> ment with similar terms and conditions.<span class=\"_ _1a9\"> </span>each asset in the unit. An impairment loss recognized f<span class=\"_ _4\"></span>or<span class=\"_ _1a9\"> </span> goodwill cannot be rever<span class=\"_ _4\"></span>sed in a subsequent period<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or<span class=\"_ _1a9\"> </span> Right-of-use assets are measured at cost comprising the<span class=\"_ _1a9\"> </span> assets other than goodwill,<span class=\"_ _4\"></span> wher<span class=\"_ _4\"></span>e an impairment loss is<span class=\"_ _1a9\"> </span> amount of the initial measurement of the lease liability and<span class=\"_ _1a9\"> </span> subsequently reversed<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the carr<span class=\"_ _3\"></span>ying amount of the asset<span class=\"_ _1a9\"> </span> any lease payments made at or befor<span class=\"_ _4\"></span>e the commence<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>(cash-generating unit) is increased to the r<span class=\"_ _4\"></span>evised estimate<span class=\"_ _1a9\"> </span> ment date.<span class=\"_ _1a9\"> </span>of its reco<span class=\"_ _4\"></span>verable value<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> but in such a way that the incr<span class=\"_ _4\"></span>eased<span class=\"_ _1a9\"> </span> carr<span class=\"_ _3\"></span>ying amount does not exceed the carr<span class=\"_ _3\"></span>ying amount<span class=\"_ _1a9\"> </span> Payments associated with short-term leases and leases of<span class=\"_ _1a9\"> </span> that would ha<span class=\"_ _4\"></span>ve been determined had no impairment loss<span class=\"_ _1a9\"> </span> low-value assets ar<span class=\"_ _4\"></span>e recognized on a straight-line basis as<span class=\"_ _1a9\"> </span> been included for the asset (cash-gener<span class=\"_ _4\"></span>ating unit) in prior<span class=\"_ _1a9\"> </span> an expense in profit or loss<span class=\"_ _4\"></span>. Short-term leases comprise<span class=\"_ _1a9\"> </span> years<span class=\"_ _4\"></span>. The r<span class=\"_ _4\"></span>eversal of an impairment loss is included im<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>some car leases and are leases with a lease term of tw<span class=\"_ _4\"></span>elve<span class=\"_ _1a9\"> </span> mediately in the statement of profit and loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>months or less. Lo<span class=\"_ _4\"></span>w-value assets only comprise of one<span class=\"_ _1a9\"> </span> copier<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>(L) <span class=\"_ _72\"> </span>INCOME T<span class=\"_ _25\"></span>AXES<span class=\"_ _1a9\"> </span>W<span class=\"_ _4\"></span>e refer to note 5<span class=\"_ _1\"></span>.7<span class=\"_ _25\"></span>.2 for more information.<span class=\"_ _1a9\"> </span>Income tax expenses in the statement of profit and loss<span class=\"_ _1a9\"> </span> comprise the tax currently payab<span class=\"_ _4\"></span>le.<span class=\"_ _1a9\"> </span>(K) <span class=\"_ _56\"> </span>IMP<span class=\"_ _1\"></span>AIRMENT L<span class=\"_ _1\"></span>OSSES ON GOODWILL,<span class=\"_ _4\"></span> INT<span class=\"_ _25\"></span>ANGIBLE ASSETS AND PROPERTY<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> The tax curr<span class=\"_ _4\"></span>ently payable is based on taxable pr<span class=\"_ _4\"></span>ofit for<span class=\"_ _1a9\"> </span> PLANT AND EQUIPMENT<span class=\"_ _1a9\"> </span>the year<span class=\"_ _1\"></span>. T<span class=\"_ _25\"></span>axable profit differs from net pr<span class=\"_ _4\"></span>ofit as reported<span class=\"_ _1a9\"> </span> on the statement of profit and loss because it excludes<span class=\"_ _1a9\"> </span> Intangible assets with an indefinite useful life or <span class=\"_ _4\"></span>not yet<span class=\"_ _1a9\"> </span> items of income or expense that are taxable or deductib<span class=\"_ _4\"></span>le<span class=\"_ _1a9\"> </span> available f<span class=\"_ _4\"></span>or use and goodwill are not subject to amortiza<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>in other years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and it further excludes items that are never<span class=\"_ _1a9\"> </span> tion but are tested ann<span class=\"_ _4\"></span>ually for impairment or if there is an<span class=\"_ _1a9\"> </span> taxable or deductible<span class=\"_ _4\"></span>. The Gr<span class=\"_ _4\"></span>oup<span class=\"_ _1\"></span>\u2019<span class=\"_ _4\"></span>s liability for cur<span class=\"_ _4\"></span>rent tax<span class=\"_ _1a9\"> </span> indication that an asset may be impaired<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>is calculated using tax rates that have been enacted or<span class=\"_ _1a9\"> </span> substantially enacted on the reporting date.<span class=\"_ _1a9\"> </span>Assets that are subject to amortization or depreciation are<span class=\"_ _1a9\"> </span> review<span class=\"_ _4\"></span>ed for impairment whenever events or changes in<span class=\"_ _1a9\"> </span> Deferred tax is the tax expected to be payab<span class=\"_ _4\"></span>le or reco<span class=\"_ _4\"></span>v<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>circumstances indicate that the carr<span class=\"_ _3\"></span>ying amount may not<span class=\"_ _1a9\"> </span> erable on diff<span class=\"_ _4\"></span>erences betw<span class=\"_ _4\"></span>een the carr<span class=\"_ _3\"></span>ying amounts of<span class=\"_ _1a9\"> </span> be reco<span class=\"_ _4\"></span>verable<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>assets and liabilities in the financial statements and the<span class=\"_ _1a9\"> </span> corresponding tax bases used in the computation of<span class=\"_ _1a9\"> </span> An impairment loss is recognized for the amount b<span class=\"_ _4\"></span>y which<span class=\"_ _1a9\"> </span> taxable profit and is accounted for using the balance sheet<span class=\"_ _1a9\"> </span> the carr<span class=\"_ _3\"></span>ying amount of the asset exceeds its recover<span class=\"_ _4\"></span>able<span class=\"_ _1a9\"> </span> method<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>amount. The reco<span class=\"_ _4\"></span>verab<span class=\"_ _4\"></span>le amount is the higher of an asset\u2019<span class=\"_ _1\"></span>s<span class=\"_ _1a9\"> </span> fair value less the costs to sell the asset and its value in use<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> Deferred tax liabilities ar<span class=\"_ _4\"></span>e generally r<span class=\"_ _4\"></span>ecognized for all<span class=\"_ _1a9\"> </span> These values are gener<span class=\"_ _4\"></span>ally determined based on discount<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>taxable temporary differences. Def<span class=\"_ _4\"></span>erred tax assets are r<span class=\"_ _4\"></span>ec<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ed cash flow calculations<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or the purpose of assessing im<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ognized to the extent that it is probable that taxab<span class=\"_ _4\"></span>le profits<span class=\"_ _1a9\"> </span> pairment,<span class=\"_ _4\"></span> assets are gr<span class=\"_ _4\"></span>ouped at the low<span class=\"_ _4\"></span>est levels for which<span class=\"_ _1a9\"> </span> will be available against whic<span class=\"_ _4\"></span>h deductible temporary<span class=\"_ _1a9\"> </span><div class=\"t m0 ha ff2 fs5 fc0 sc0 ls0 ws0 gsb5\">83<span class=\"_ _1a9\"> </span></div><div class=\"t m0 hb ff6 fs6 fc5 sc0 lsa wse gsb6\">OXURION<span class=\"ff7 ws0\"> ANNU<span class=\"_ _4\"></span>AL REPORT 2022<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws18f gsb7\">differences can be utilized<span class=\"_ _1\"></span>. Such assets and liabilities are </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws161 gsb8\">not recognized if the temporary difference arises from </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws69 gsb9\">goodwill (or negative goodwill) or fr<span class=\"_ _4\"></span>om the initial recogni<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws33 gsba\">tion (other than in a business combination) of other assets </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws39 gsbb\">and liabilities in a transaction that affects neither the tax </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsbc\">profit nor the accounting profit.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws10f gsbd\">Deferred tax liabilities ar<span class=\"_ _4\"></span>e recognized for taxab<span class=\"_ _4\"></span>le temporar<span class=\"_ _3\"></span>y </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf9 gsbe\">differences arising on in<span class=\"_ _4\"></span>vestments in subsidiaries and as<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa9 gsbf\">sociates,<span class=\"_ _1\"></span> and interests in joint ventures,<span class=\"_ _1\"></span> except where the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb3 gsc0\">Group is able to contro<span class=\"_ _4\"></span>l the reversal of the temporary dif<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws8c gsc1\">ference and it is probab<span class=\"_ _4\"></span>le that the temporary difference </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsc2\">will not reverse in the for<span class=\"_ _4\"></span>eseeable future<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsff gsc3\">Deferred tax is calculated at the tax r<span class=\"_ _4\"></span>ates that are expected </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsba gsc4\">to apply in the period when the liability is settled<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> or the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws110 gsc5\">asset realized<span class=\"_ _1\"></span>. Deferred tax is charged or cr<span class=\"_ _4\"></span>edited in the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf6 gsc6\">statement of profit and loss,<span class=\"_ _1\"></span> except when it relates to items </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws15a gsc7\">charged or cr<span class=\"_ _4\"></span>edited directly to equity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> in whic<span class=\"_ _4\"></span>h case the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsc8\">deferred tax is also dealt with in equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wscc gsc9\">Deferred tax assets and liabilities ar<span class=\"_ _4\"></span>e offset when they </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1c1 gsca\">relate to income taxes levied b<span class=\"_ _4\"></span>y the same taxation authority </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws8b gscb\">and the Group intends to settle its current tax assets and </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gscc\">liabilities on a net basis<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb0 gscd\">The Group also r<span class=\"_ _4\"></span>eceives tax credits for R&amp;D expenses<span class=\"_ _4\"></span>. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws13c gsce\">These R&amp;D expenses are r<span class=\"_ _4\"></span>ecorded through P&amp;L under </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws103 gscf\">IFRS in the line item \u2018Research and development expenses<span class=\"_ _1\"></span>\u2019 </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsc8 gsd0\">as the expenses do not meet the requirements in IAS 38 </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws98 gsd1\">to be capitalized<span class=\"_ _4\"></span>. The tax cr<span class=\"_ _4\"></span>edit is not subject to unfulfilled </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws91 gsd2\">conditions. In case ther<span class=\"_ _4\"></span>e is insufficient tax against which </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws14d gsd3\">to set off the tax credit,<span class=\"_ _1\"></span> the credit can be carried for<span class=\"_ _3\"></span>ward </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws59 gsd4\">during 5 consecutive assessment years<span class=\"_ _4\"></span>. The tax cr<span class=\"_ _4\"></span>edit re<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws4b gsd5\">ceivable is presented f<span class=\"_ _4\"></span>or the non-current portion in the line </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsac gsd6\">item \u2018Non-current tax cr<span class=\"_ _4\"></span>edit\u2019 and for the current portion in </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws101 gsd7\">the line item \u2018Current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _4\"></span>\u2019 of the consolidated </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws78 gsd8\">statement of financial position. At the end of 5 consecu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws155 gsd9\">tive assessment years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the balance of the unused tax cr<span class=\"_ _4\"></span>edit </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws186 gsda\">is received in cash from the go<span class=\"_ _4\"></span>vernment. The income </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws115 gsdb\">from those tax credits is inc<span class=\"_ _4\"></span>luded in the line item \u2018Other </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsdc\">operating income\u2019 in the statement of profit and loss<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h17 ff2 fs9 fc7 sc0 ls0 ws0 gsdd\">(M) <span class=\"_ _7d\"> </span>EMPL<span class=\"_ _4\"></span>O<span class=\"_ _4\"></span>YEE BENEFIT PLAN<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gsde\">Short-term employee benefits<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws18c gsdf\">Liabilities for wages and salaries that ar<span class=\"_ _4\"></span>e expected to be<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws19 gse0\">settled wholly within tw<span class=\"_ _4\"></span>elve months after the end of the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws3a gse1\">period in which the emplo<span class=\"_ _4\"></span>y<span class=\"_ _4\"></span>ees render the related service<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws61 gse2\">are recognized in r<span class=\"_ _4\"></span>espect of emplo<span class=\"_ _4\"></span>yees<span class=\"_ _1\"></span>\u2019 ser<span class=\"_ _23\"></span>vices up to<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws47 gse3\">the end of the reporting period and are measured at<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1aa gse4\">the amounts expected to be paid when the liabilities are<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws3f gse5\">settled<span class=\"_ _4\"></span>. The liabilities ar<span class=\"_ _4\"></span>e presented as curr<span class=\"_ _4\"></span>ent emplo<span class=\"_ _4\"></span>yee<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gse6\">benefit obligations in the statement of financial position.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gse7\">Pension benefits<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1ec gse8\">Starting July 1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2009<span class=\"_ _1\"></span>, the Group c<span class=\"_ _4\"></span>hanged the defined<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws246 gse9\">benefit pension plan into a new defined contribution<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf7 gsea\">pension plan. All acquired rights up to J<span class=\"_ _4\"></span>une 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2009<span class=\"_ _25\"></span>, ar<span class=\"_ _4\"></span>e<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws19 gseb\">retained<span class=\"_ _1\"></span>. Therefore<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the Group has two pension plans: (i)<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1d gsec\">the initial defined benefit plan and (ii) the pension plan,<span class=\"_ _1\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsed\">which is a defined contribution p<span class=\"_ _4\"></span>lan in structure<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsdd gsee\">The assets of both plans ar<span class=\"_ _4\"></span>e held in separate trustee-ad<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsef\">ministered funds<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws202 gsf0\">According to the Belgian legislation app<span class=\"_ _4\"></span>licable to the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws224 gsf1\">second pillar pension plans (the minimum guar<span class=\"_ _4\"></span>anteed<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws247 gsf2\">return under the so-called \u201cLaw V<span class=\"_ _1\"></span>andenbroucke\u201d)<span class=\"_ _1\"></span>, all<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws97 gsf3\">Belgian pension plans that ar<span class=\"_ _4\"></span>e structured as defined con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws2a gsf4\">tribution plans ar<span class=\"_ _4\"></span>e considered defined benefit plans under<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsf5\">IFRS and therefor<span class=\"_ _4\"></span>e are accounted for as such.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wse8 gsf6\">Because of this minimum guaranteed r<span class=\"_ _4\"></span>eturn,<span class=\"_ _4\"></span> the emplo<span class=\"_ _4\"></span>yer<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws134 gsf7\">is exposed to a financial risk since further contributions<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws87 gsf8\">could be required if the r<span class=\"_ _4\"></span>eturn on the assets is not suffi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsf9\">cient to reach the minim<span class=\"_ _4\"></span>um benefits to be paid<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws125 gsfa\">The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s commitments under defined benefit plans,<span class=\"_ _1\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1aa gsfb\">and the related costs,<span class=\"_ _1\"></span> are measured using the \u201cprojected<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws156 gsfc\">unit credit method<span class=\"_ _1\"></span>\u201d with actuarial valuations being carried<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws10c gsfd\">out at each balance sheet date b<span class=\"_ _4\"></span>y a qualified actuar<span class=\"_ _3\"></span>y<span class=\"_ _25\"></span>. Past<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws10b gsfe\">ser<span class=\"_ _3\"></span>vice cost is included immediately to the extent that the<span class=\"_ _1a9\"> </span> </div>benefits are alread<span class=\"_ _4\"></span>y vested<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> and other<span class=\"_ _23\"></span>wise the ser<span class=\"_ _3\"></span>vice is<span class=\"_ _1a9\"> </span> of the revision of original estimates<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> if an<span class=\"_ _4\"></span>y<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> in the statement<span class=\"_ _1a9\"> </span> amortized on a straight-line basis over the aver<span class=\"_ _4\"></span>age period<span class=\"_ _1a9\"> </span> of profit and loss,<span class=\"_ _1\"></span> and a corresponding adjustment to equity<span class=\"_ _1a9\"> </span> until the benefits become vested<span class=\"_ _4\"></span>. Remeasurements of the<span class=\"_ _1a9\"> </span> over the r<span class=\"_ _4\"></span>emaining vesting period<span class=\"_ _4\"></span>. The pr<span class=\"_ _4\"></span>oceeds received<span class=\"_ _1\"></span>, net<span class=\"_ _1a9\"> </span> net defined obligation are r<span class=\"_ _4\"></span>ecognized directly within equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>of any dir<span class=\"_ _4\"></span>ectly attributable tr<span class=\"_ _4\"></span>ansaction costs,<span class=\"_ _1\"></span> are credited to<span class=\"_ _1a9\"> </span> share capital (nominal value) and share pr<span class=\"_ _4\"></span>emium when the<span class=\"_ _1a9\"> </span> The retir<span class=\"_ _4\"></span>ement benefit obligation recognized in the<span class=\"_ _1a9\"> </span> subscription rights are exercised<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>statement of financial position represents the f<span class=\"_ _4\"></span>air value of<span class=\"_ _1a9\"> </span> plan assets at the reporting date,<span class=\"_ _1\"></span> less plan liabilities calcu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>(N) <span class=\"_ _56\"> </span><span class=\"ws0\">FINANCIAL INS<span class=\"_ _4\"></span>TRUMENTS<span class=\"_ _1a9\"> </span></span>lated using the projected unit credit method discounted<span class=\"_ _1a9\"> </span> to its present value using yields availab<span class=\"_ _4\"></span>le on high quality<span class=\"_ _1a9\"> </span> F<span class=\"_ _4\"></span>inancial assets<span class=\"_ _1a9\"> </span>corporate bonds that have maturity dates appr<span class=\"_ _4\"></span>oximating<span class=\"_ _1a9\"> </span> to the terms of the liabilities and are denominated in the<span class=\"_ _1a9\"> </span> IN<span class=\"_ _3\"></span>ITIAL R<span class=\"_ _3\"></span>ECOGNI<span class=\"_ _3\"></span>TIO<span class=\"_ _3\"></span>N AND M<span class=\"_ _3\"></span>E<span class=\"_ _3\"></span>ASU<span class=\"_ _3\"></span>REM<span class=\"_ _3\"></span>ENT<span class=\"_ _1a9\"> </span>same currency as the post-emp<span class=\"_ _4\"></span>loyment benefit obliga<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>F<span class=\"_ _4\"></span>inancial assets are classifi<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> at initial recognition,<span class=\"_ _4\"></span> and subse<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tions less the effect of minimum funding requir<span class=\"_ _4\"></span>ements<span class=\"_ _1a9\"> </span> quently measured<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> at either amortized cost, fair value thr<span class=\"_ _4\"></span>ough<span class=\"_ _1a9\"> </span> agreed with scheme tr<span class=\"_ _4\"></span>ustees.<span class=\"_ _1a9\"> </span>other comprehensive income (<span class=\"ff3 ws5b\">\u201cOCI<span class=\"_ _4\"></span>\u201d<span class=\"ff1 ws136\">) or fair value through<span class=\"_ _1a9\"> </span></span></span><span class=\"ff3 ws5b\"><span class=\"ff1 ws136\"> </span></span>profit or loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> No other long- or short-term benefits are granted to<span class=\"_ _1a9\"> </span> emplo<span class=\"_ _4\"></span>yees<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The classification of financial assets at initial r<span class=\"_ _4\"></span>ecognition<span class=\"_ _1a9\"> </span> depends on the financial asset\u2019<span class=\"_ _1\"></span>s contractual cash flow c<span class=\"_ _4\"></span>har<span class=\"_ _1\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>Share-based compensation<span class=\"_ _1a9\"> </span>acteristics and the Company\u2019<span class=\"_ _1\"></span>s business model for manag<span class=\"_ _4\"></span>ing<span class=\"_ _1a9\"> </span> them. With the exception of trade r<span class=\"_ _4\"></span>eceivables that do not<span class=\"_ _1a9\"> </span> The Group oper<span class=\"_ _4\"></span>ates equity-settled<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> share-based compensa<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>contain a significant financing component,<span class=\"_ _4\"></span> the Compan<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span> tion plans through whic<span class=\"_ _4\"></span>h it grants share subscription rights<span class=\"_ _1a9\"> </span> initially measures a financial asset at its fair value <span class=\"_ _4\"></span>plus,<span class=\"_ _1\"></span> in the<span class=\"_ _3\"></span> (giving the holder the right to subscribe to a specific number<span class=\"_ _1a9\"> </span> case of a financial asset not at fair value through profit or loss<span class=\"_ _4\"></span>,<span class=\"_ _1a9\"> </span> of shares in accordance with the shar<span class=\"_ _4\"></span>e option plan,<span class=\"_ _1\"></span> hereafter<span class=\"_ _3\"></span> transaction costs<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> referr<span class=\"_ _4\"></span>ed to as \u2018subscription rights<span class=\"_ _4\"></span>\u2019) to the CEO<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> personnel,<span class=\"_ _1a9\"> </span> and consultants as consideration in exchange f<span class=\"_ _4\"></span>or ser<span class=\"_ _3\"></span>vices<span class=\"_ _3\"></span> T<span class=\"_ _25\"></span>rade receivables that do not contain a significant financing<span class=\"_ _1a9\"> </span> performed<span class=\"_ _4\"></span>. The fair value of the services received in exchange<span class=\"_ _1a9\"> </span> component are measured initiall<span class=\"_ _4\"></span>y at the transaction price de<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>for the granting of the subscription rights is r<span class=\"_ _4\"></span>ecognized as<span class=\"_ _1a9\"> </span> termined under IFRS 15<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>an expense over the vesting period with a corr<span class=\"_ _4\"></span>esponding<span class=\"_ _1a9\"> </span> increase in equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span> In order for a financial asset to be classifi<span class=\"_ _4\"></span>ed and measured<span class=\"_ _1a9\"> </span> at amortized cost or fair value through OCI<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> it needs to give<span class=\"_ _1a9\"> </span> The total amount to be expensed o<span class=\"_ _4\"></span>ver the vesting period<span class=\"_ _1a9\"> </span> rise to cash flows that ar<span class=\"_ _4\"></span>e \u2018solely payments of principal and<span class=\"_ _1a9\"> </span> is determined by r<span class=\"_ _4\"></span>eference to the fair value at the date on<span class=\"_ _1a9\"> </span> interest\u2019 (<span class=\"ff3 ws5b\">\u201cSPPI<span class=\"_ _4\"></span>\u201d<span class=\"ff1 ws50\">) on the principal amount outstanding. This<span class=\"_ _1a9\"> </span></span></span><span class=\"ff3 ws5b\"><span class=\"ff1 ws50\"> </span></span>which the subscription rights are gr<span class=\"_ _4\"></span>anted<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> measured using<span class=\"_ _3\"></span> assessment is referr<span class=\"_ _4\"></span>ed to as the SPPI test and is performed<span class=\"_ _3\"></span> the Black &amp; Scho<span class=\"_ _4\"></span>les model,<span class=\"_ _4\"></span> taking into account the term and<span class=\"_ _1a9\"> </span> at an instrument level.<span class=\"_ _1a9\"> </span> conditions upon which the subscription rights w<span class=\"_ _4\"></span>ere granted<span class=\"_ _1a9\"> </span> excluding the impact of an<span class=\"_ _4\"></span>y non-market vesting conditions. A<span class=\"_ _4\"></span>t<span class=\"_ _1a9\"> </span> The Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s business model for managing financial<span class=\"_ _1a9\"> </span> each balance sheet date<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the entity r<span class=\"_ _4\"></span>evises its estimates of the<span class=\"_ _1a9\"> </span> assets refers to ho<span class=\"_ _4\"></span>w it manages its financial assets in order<span class=\"_ _1a9\"> </span> number of subscription rights that are expected to become<span class=\"_ _1a9\"> </span> to generate cash flo<span class=\"_ _4\"></span>ws<span class=\"_ _4\"></span>. The business model determines<span class=\"_ _1a9\"> </span> exercisable except wher<span class=\"_ _4\"></span>e forfeiture is only due to shares not<span class=\"_ _1a9\"> </span> whether cash flows will r<span class=\"_ _4\"></span>esult from collecting contractual cash<span class=\"_ _1a9\"> </span> achieving the thresho<span class=\"_ _4\"></span>ld for vesting. It recognizes the impact<span class=\"_ _1a9\"> </span> flows<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> selling the financial assets<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> or both<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span> SUBS<span class=\"_ _3\"></span>EQUENT ME<span class=\"_ _3\"></span>ASU<span class=\"_ _3\"></span>REMENT<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>or purposes of subsequent measurement,<span class=\"_ _4\"></span> the fo<span class=\"_ _4\"></span>llowing cat<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>egories of financial assets are r<span class=\"_ _4\"></span>elevant to the Company:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _6c\"> </span><span class=\"ws157\">F<span class=\"_ _4\"></span>inancial assets at amortized costs (trade receivables,<span class=\"_ _4\"></span> </span>term deposits); and<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _6c\"> </span><span class=\"ws165\">F<span class=\"_ _4\"></span>inancial assets at fair value through OCI (in<span class=\"_ _4\"></span>vestments in<span class=\"_ _1a9\"> </span></span><span class=\"ws165\"> </span>debt instruments (bonds))<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>FINA<span class=\"_ _3\"></span>NCIAL A<span class=\"_ _3\"></span>SS<span class=\"_ _3\"></span>ETS A<span class=\"_ _1\"></span>T A<span class=\"_ _3\"></span>MO<span class=\"_ _3\"></span>RTIZED COST<span class=\"_ _1a9\"> </span>This category is the most relevant to the Company<span class=\"_ _25\"></span>. The<span class=\"_ _1a9\"> </span> Company measur<span class=\"_ _4\"></span>es financial assets at amortized cost if both<span class=\"_ _3\"></span> of the follo<span class=\"_ _4\"></span>wing conditions are met:<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _6c\"> </span><span class=\"ws64\">The financial asset is held within a business model with<span class=\"_ _1a9\"> </span></span><span class=\"ws64\"> </span>the objective to hold financial assets in order to collect<span class=\"_ _1a9\"> </span> contractual cash flo<span class=\"_ _4\"></span>ws; and<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _6c\"> </span><span class=\"ws6e\">The contractual terms of the financial asset g<span class=\"_ _4\"></span>ive rise on<span class=\"_ _1a9\"> </span></span><span class=\"ws6e\"> </span>specified dates to cash flo<span class=\"_ _4\"></span>ws that are solely payments of<span class=\"_ _1a9\"> </span> principal and interest on the principal amount outstanding. <span class=\"_ _107\"></span> F<span class=\"_ _4\"></span>inancial assets at amortized cost are subsequently measured<span class=\"_ _1a9\"> </span> using the effective interest r<span class=\"_ _4\"></span>ate (<span class=\"ff3 ws5b\">\u201cEIR\u201d</span>) method and are subject<span class=\"_ _1a9\"> </span> to impairment. Gains and losses are recognized in pr<span class=\"_ _4\"></span>ofit or<span class=\"_ _1a9\"> </span> loss when the asset is derecognized<span class=\"_ _1\"></span>, modifi<span class=\"_ _4\"></span>ed or impaired<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s financial assets at amor<span class=\"_ _3\"></span>tized cost mainly<span class=\"_ _1a9\"> </span> includes trade r<span class=\"_ _4\"></span>eceivables and term deposits<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>FINA<span class=\"_ _3\"></span>NCIAL A<span class=\"_ _3\"></span>SS<span class=\"_ _3\"></span>ETS TH<span class=\"_ _3\"></span>ROU<span class=\"_ _3\"></span>GH OCI (DEBT IN<span class=\"_ _3\"></span>STRU<span class=\"_ _3\"></span>MEN<span class=\"_ _3\"></span>TS<span class=\"_ _4\"></span>)<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y measures debt instruments at fair value<span class=\"_ _1a9\"> </span> through OCI if both of the follo<span class=\"_ _4\"></span>wing conditions are met:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _6c\"> </span><span class=\"ws64\">The financial asset is held within a business model with<span class=\"_ _1a9\"> </span></span><span class=\"ws64\"> </span>the objective of both holding to collect contractual cash<span class=\"_ _1a9\"> </span> flows and selling; and<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _6c\"> </span><span class=\"ws6e\">The contractual terms of the financial asset g<span class=\"_ _4\"></span>ive rise on<span class=\"_ _1a9\"> </span></span><span class=\"ws6e\"> </span>specified dates to cash flo<span class=\"_ _4\"></span>ws that are solely payments of<span class=\"_ _1a9\"> </span> principal and interest on the principal amount outstanding.<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>or debt instruments at fair value through OCI<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> interest<span class=\"_ _1a9\"> </span> income,<span class=\"_ _1\"></span> foreign exchange r<span class=\"_ _4\"></span>evaluation and impairment losses<span class=\"_ _1a9\"> </span> or reversals ar<span class=\"_ _4\"></span>e recognized in the statement of profit or loss<span class=\"_ _1a9\"> </span> and computed in the same manner as for financial assets<span class=\"_ _1a9\"> </span> measured at amortized cost. The remaining fair value c<span class=\"_ _4\"></span>hanges<span class=\"_ _1a9\"> </span> are recognized in OCI<span class=\"_ _1\"></span>. Upon derecognition,<span class=\"_ _4\"></span> the cumulative f<span class=\"_ _4\"></span>air<span class=\"_ _1a9\"> </span> value change recognized in OCI is r<span class=\"_ _4\"></span>ecyc<span class=\"_ _4\"></span>led to profit or loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s debt instruments at fair value through OCI<span class=\"_ _1a9\"> </span> includes investments in quoted debt instr<span class=\"_ _4\"></span>uments (bonds)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>DERE<span class=\"_ _4\"></span>COGNITION<span class=\"_ _1a9\"> </span>A financial asset (or<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> where applicab<span class=\"_ _4\"></span>le<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> a part of a financial<span class=\"_ _3\"></span> asset or part of a group of similar financial assets) is primarily<span class=\"_ _3\"></span> derecognized (i.e<span class=\"_ _4\"></span>.,<span class=\"_ _4\"></span> r<span class=\"_ _4\"></span>emoved from the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s consolidated<span class=\"_ _1a9\"> </span> statement of financial position) when:<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _6c\"> </span><span class=\"wse3\">The rights to receive cash fl<span class=\"_ _4\"></span>ows from the asset ha<span class=\"_ _4\"></span>ve<span class=\"_ _1a9\"> </span></span><span class=\"wse3\"> </span>expired; or<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _6c\"> </span><span class=\"ws19e\">The Compan<span class=\"_ _4\"></span>y has transferr<span class=\"_ _4\"></span>ed its rights to receive cash<span class=\"_ _1a9\"> </span></span><span class=\"ws19e\"> </span>flows fr<span class=\"_ _4\"></span>om the asset or has assumed an obligation to<span class=\"_ _1a9\"> </span> pay the received cash flo<span class=\"_ _4\"></span>ws in full without material delay<span class=\"_ _1a9\"> </span> to a third party under a \u2018pass-through\u2019 arrangement and<span class=\"_ _1a9\"> </span> either (a) the Company has tr<span class=\"_ _4\"></span>ansferred substantially all<span class=\"_ _1a9\"> </span> the risks and rew<span class=\"_ _4\"></span>ards of the asset,<span class=\"_ _4\"></span> or (b) the Compan<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span> has neither transferr<span class=\"_ _4\"></span>ed nor retained substantially all the<span class=\"_ _1a9\"> </span> risks and rew<span class=\"_ _4\"></span>ards of the asset but has transf<span class=\"_ _4\"></span>erred contro<span class=\"_ _4\"></span>l<span class=\"_ _1a9\"> </span> of the asset.<span class=\"_ _1a9\"> </span>I<span class=\"_ _1a9\"> </span>MP<span class=\"_ _1\"></span>AIRMENT OF<span class=\"_ _4\"></span> FINA<span class=\"_ _4\"></span>NCIAL<span class=\"_ _4\"></span> ASSET<span class=\"_ _4\"></span>S<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y recognizes an allow<span class=\"_ _4\"></span>ance for expected cr<span class=\"_ _4\"></span>edit<span class=\"_ _1a9\"> </span> losses (<span class=\"ff3 ws5b\">\u201cECLs<span class=\"_ _4\"></span>\u201d<span class=\"ff1 wsd9\">) for all debt instruments not held at fair value<span class=\"_ _1a9\"> </span></span></span><span class=\"ff3 ws5b\"><span class=\"ff1 wsd9\"> </span></span>through profit or loss<span class=\"_ _4\"></span>. ECLs are based on the differ<span class=\"_ _4\"></span>ence<span class=\"_ _1a9\"> </span> between the contr<span class=\"_ _4\"></span>actual cash flows due in accordance with<span class=\"_ _1a9\"> </span> the contract and all the cash flo<span class=\"_ _4\"></span>ws that the Company expects<span class=\"_ _1a9\"> </span> to receive<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> discounted at an appro<span class=\"_ _4\"></span>ximation of the original<span class=\"_ _1a9\"> </span> effective interest r<span class=\"_ _4\"></span>ate. T<span class=\"_ _4\"></span>he expected cash flows will inc<span class=\"_ _4\"></span>lude<span class=\"_ _1a9\"> </span> cash flows fr<span class=\"_ _4\"></span>om the sale of collateral held or other credit en<span class=\"_ _4\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>hancements that are integral to the contr<span class=\"_ _4\"></span>actual terms<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>or trade receivables and term deposits<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the Compan<span class=\"_ _4\"></span>y applies<span class=\"_ _1a9\"> </span>a simplified approac<span class=\"_ _4\"></span>h in calculating ECLs. T<span class=\"_ _4\"></span>herefor<span class=\"_ _4\"></span>e,<span class=\"_ _1\"></span> the<span class=\"_ _3\"></span> Company does not tr<span class=\"_ _4\"></span>ack changes in cr<span class=\"_ _4\"></span>edit risk,<span class=\"_ _4\"></span> but instead<span class=\"_ _1a9\"> </span>recognizes a loss allo<span class=\"_ _4\"></span>wance based on lifetime ECLs at eac<span class=\"_ _4\"></span>h<span class=\"_ _1a9\"> </span>reporting date.<span class=\"_ _1a9\"> </span>Upon impairment,<span class=\"_ _4\"></span> the carrying amount of the financial assets<span class=\"_ _3\"></span> is directly r<span class=\"_ _4\"></span>educed by the impairment loss,<span class=\"_ _1\"></span> with the exception<span class=\"_ _3\"></span> of trade receivab<span class=\"_ _4\"></span>les. F<span class=\"_ _25\"></span>or trade receivables,<span class=\"_ _1\"></span> the carr<span class=\"_ _3\"></span>ying amount<span class=\"_ _3\"></span> is reduced b<span class=\"_ _4\"></span>y means of a separate impairment account. If a<span class=\"_ _1a9\"> </span>trade receivab<span class=\"_ _4\"></span>le is considered uncollectib<span class=\"_ _4\"></span>le,<span class=\"_ _1\"></span> it is written off in<span class=\"_ _3\"></span> the impairment account. Subsequent collection of amounts<span class=\"_ _1a9\"> </span>that had previously been written off is cr<span class=\"_ _4\"></span>edited in the impair<span class=\"_ _1\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>ment account. Modifications in the carr<span class=\"_ _3\"></span>ying amount of the<span class=\"_ _3\"></span> impairment account are recognized in the statement of pr<span class=\"_ _4\"></span>ofit<span class=\"_ _1a9\"> </span>and loss.<span class=\"_ _1a9\"> </span>CASH AND CASH<span class=\"_ _4\"></span> E<span class=\"_ _4\"></span>QUIV<span class=\"_ _1\"></span>ALENTS<span class=\"_ _1a9\"> </span>Cash and cash equivalents comprise demand deposits<span class=\"_ _1a9\"> </span>and other short-term, highl<span class=\"_ _4\"></span>y liquid investments (with less<span class=\"_ _1a9\"> </span>than three months to maturity) that are r<span class=\"_ _4\"></span>eadily convertible<span class=\"_ _1a9\"> </span>into a known amount of cash and ar<span class=\"_ _4\"></span>e subject to an insig<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>nificant risk of fluctuations in value<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial liabilities<span class=\"_ _1a9\"> </span>DISTIN<span class=\"_ _3\"></span>CTION BE<span class=\"_ _3\"></span>TWEEN FINAN<span class=\"_ _3\"></span>CIAL LIABILITIES<span class=\"_ _1a9\"> </span>AN<span class=\"_ _3\"></span>D<span class=\"_ _3\"></span> EQ<span class=\"_ _3\"></span>U<span class=\"_ _3\"></span>IT<span class=\"_ _23\"></span>Y<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial liabilities and equity instruments issued by the Gr<span class=\"_ _4\"></span>oup<span class=\"_ _1a9\"> </span>are classifi<span class=\"_ _4\"></span>ed according to the substance of the contractual<span class=\"_ _1a9\"> </span>arrangements enter<span class=\"_ _4\"></span>ed into and the definitions of a financial<span class=\"_ _1a9\"> </span>liability and an equity instrument. An equity instrument is an<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span>contract that evidences a residual inter<span class=\"_ _4\"></span>est in the assets of the<span class=\"_ _1a9\"> </span>Group after deducting all its liabilities<span class=\"_ _4\"></span>. The accounting policies<span class=\"_ _1a9\"> </span>adopted for specific financial liabilities and equity instruments<span class=\"_ _1a9\"> </span>are set out belo<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>IN<span class=\"_ _3\"></span>ITIAL R<span class=\"_ _3\"></span>ECOGNI<span class=\"_ _3\"></span>TIO<span class=\"_ _3\"></span>N AND M<span class=\"_ _3\"></span>E<span class=\"_ _3\"></span>ASU<span class=\"_ _3\"></span>REM<span class=\"_ _3\"></span>ENT<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial liabilities are c<span class=\"_ _4\"></span>lassified<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> at initial recognition,<span class=\"_ _4\"></span> at fair<span class=\"_ _1a9\"> </span>value through profit or loss,<span class=\"_ _1\"></span> loans and borrowings<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> payables<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> or as derivatives designated as hedging instruments in an<span class=\"_ _1a9\"> </span>effective hedge<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> as appropriate<span class=\"_ _4\"></span>. All financial liabilities are<span class=\"_ _1a9\"> </span>recognized initially at fair value and<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> in the case of loans<span class=\"_ _1a9\"> </span>and borro<span class=\"_ _4\"></span>wings and payables,<span class=\"_ _1\"></span> net of directly attributable<span class=\"_ _1a9\"> </span>transaction costs<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s financial liabilities include trade and other<span class=\"_ _1a9\"> </span>payables and convertible loans<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>SUBS<span class=\"_ _3\"></span>EQUENT ME<span class=\"_ _3\"></span>ASU<span class=\"_ _3\"></span>REMENT<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>or purposes of subsequent measurement,<span class=\"_ _1\"></span> financial liabili<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ties are classifi<span class=\"_ _4\"></span>ed in two categories:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Financial liabilities at fair value through pr<span class=\"_ _4\"></span>ofit or loss<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws1de\">Financial liabilities at amortized cost (loans and<span class=\"_ _1a9\"> </span></span>borro<span class=\"_ _4\"></span>wings)<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial liabilities at fair value through profit and loss<span class=\"_ _1a9\"> </span>include financial liabilities designated upon initial recogni<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion as at fair value through profit or loss and only if the<span class=\"_ _1a9\"> </span>criteria in IFRS 9 are satisfied<span class=\"_ _1\"></span>. The Group has designated<span class=\"_ _1a9\"> </span>convertible loans at fair value through profit and loss<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> since<span class=\"_ _1a9\"> </span>the convertible loans contain embedded derivatives for<span class=\"_ _1a9\"> </span>which assessment of whether it is requir<span class=\"_ _4\"></span>ed to separate the<span class=\"_ _1a9\"> </span>embedded derivative from the host contr<span class=\"_ _4\"></span>act to measure<span class=\"_ _1a9\"> </span>the derivative at fair value<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> w<span class=\"_ _4\"></span>ould be more complex or<span class=\"_ _1a9\"> </span>result in less reliab<span class=\"_ _4\"></span>le measures than measuring the entir<span class=\"_ _4\"></span>e<span class=\"_ _1a9\"> </span>instrument at fair value through profit or loss As suc<span class=\"_ _4\"></span>h the<span class=\"_ _1a9\"> </span>conditions in IFRS 9 4<span class=\"_ _4\"></span>.3<span class=\"_ _1\"></span>.5 are met and designation at fair<span class=\"_ _1a9\"> </span>value through profit or loss is permitted<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The convertible loans are measur<span class=\"_ _4\"></span>ed at fair value through<span class=\"_ _1a9\"> </span>profit or loss,<span class=\"_ _1\"></span> using the valuation methods described in<span class=\"_ _1a9\"> </span>note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.11<span class=\"_ _4\"></span>. T<span class=\"_ _25\"></span>ransaction costs in relation to these financial<span class=\"_ _1a9\"> </span>liabilities at fair value through profit or loss ar<span class=\"_ _4\"></span>e expensed as<span class=\"_ _1a9\"> </span>incurred and inc<span class=\"_ _4\"></span>luded in the line item \u2018F<span class=\"_ _4\"></span>inance expense\u2019 in<span class=\"_ _1a9\"> </span>the consolidated statement of profit and los<span class=\"_ _1a9\"> </span>s<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>T<span class=\"_ _25\"></span>rade and other payables are subsequently measured at amortized cost, using the eff<span class=\"_ _4\"></span>ective interest rate metho<span class=\"_ _1a9\"> </span>d<span class=\"_ _1a9\"> </span><span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>(O) <span class=\"_ _32\"> </span>EQUITY INS<span class=\"_ _4\"></span>TRUMENTS<span class=\"_ _1a9\"> </span>Equity instruments issued by the Gr<span class=\"_ _4\"></span>oup are recorded at the proceeds received<span class=\"_ _1\"></span>. Direct issue costs are processed as a deduction on equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>(P) <span class=\"_ _56\"> </span>FINANCIAL INCOME AND EXPENSES<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial income includes interest income on in<span class=\"_ _4\"></span>vested funds. Realized and unr<span class=\"_ _4\"></span>ealized exchange differ<span class=\"_ _4\"></span>ences are reported under financial income and expenses.<span class=\"_ _1a9\"> </span> (Q) <span class=\"_ _32\"> </span>SEGMENT REPORTING<span class=\"_ _1a9\"> </span>An operational segment is a component of an entity:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws18f\">which exercises operating activities with which pr<span class=\"_ _4\"></span>ofits </span>are gained and costs can be made (including pr<span class=\"_ _4\"></span>ofits and costs from transactions with other components of the entity);<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws39\">where the operational results are judged r<span class=\"_ _4\"></span>egularly b<span class=\"_ _4\"></span>y </span>the highest managerial function of the entity who can take important operational decisions in order to make decisions regarding the gr<span class=\"_ _4\"></span>anting of resources and to evaluate the financial results of the segment (chief operating decision maker); and<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws178\">for which separate financial information is availab<span class=\"_ _4\"></span>le and </span>that is engaged either in providing specific pr<span class=\"_ _4\"></span>oducts or ser<span class=\"_ _3\"></span>vices (business segment)<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> or in providing products or ser<span class=\"_ _3\"></span>vices within a par<span class=\"_ _3\"></span>ticular economic environment (geographical segment)<span class=\"_ _1\"></span>, and whic<span class=\"_ _4\"></span>h is subject to risks and rew<span class=\"_ _4\"></span>ards that are differ<span class=\"_ _4\"></span>ent from those of other segments.<span class=\"_ _1a9\"> </span>The segment information is r<span class=\"_ _4\"></span>epresented in a consistent manner regarding the internal r<span class=\"_ _4\"></span>eporting to the chief operating decision maker of the entity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> i.e<span class=\"_ _4\"></span>.,<span class=\"_ _4\"></span> the institu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion which takes the most important decisions,<span class=\"_ _4\"></span> enabling decision-making of allocating resources to the segment and evaluating financial performances of the segment. At this moment,<span class=\"_ _1\"></span> repor<span class=\"_ _3\"></span>ting is being done at a global level within Oxurion. (<span class=\"_ _1a9\"> </span>R) <span class=\"_ _56\"> </span>INVENTORIES<span class=\"_ _1a9\"> </span>Raw and ancillar<span class=\"_ _3\"></span>y materials and commodities are stated at the low<span class=\"_ _4\"></span>er of cost or net realizable value<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he inventor<span class=\"_ _3\"></span>y costing system is based on the FIFO-method<span class=\"_ _1\"></span>. Goods in process and finished goods are stated <span class=\"_ _4\"></span>at the standard manufacturing cost or net r<span class=\"_ _4\"></span>ealizable value<span class=\"_ _4\"></span>. The inventor<span class=\"_ _3\"></span>y costing system is based on the FIFO-method<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The net realizab<span class=\"_ _4\"></span>le value test is performed for each reporting period<span class=\"_ _4\"></span>. Net realizab<span class=\"_ _4\"></span>le value is the estimated selling price in the ordinar<span class=\"_ _3\"></span>y course of business less the estimated costs of completion and the estimated costs necessar<span class=\"_ _3\"></span>y to make the sale.<span class=\"_ _1a9\"> </span>The standard manuf<span class=\"_ _4\"></span>acturing price of the goods in process and of the finished goods,<span class=\"_ _1\"></span> includes (i) the acquisition value of the raw materials<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> (ii) consumab<span class=\"_ _4\"></span>les and ancillar<span class=\"_ _3\"></span>y materials,<span class=\"_ _1\"></span> (iii) the production costs that are directly attrib<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>utable to the product,<span class=\"_ _1\"></span> and (iv) the propor<span class=\"_ _3\"></span>tioned par<span class=\"_ _3\"></span>t of the production costs that are only indir<span class=\"_ _4\"></span>ectly attributab<span class=\"_ _4\"></span>le to the product,<span class=\"_ _4\"></span> in so far that these costs co<span class=\"_ _4\"></span>ver the normal pro<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>duction period<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The standard manuf<span class=\"_ _4\"></span>acturing price is compared to the actual manufacturing price on an annual basis<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and adjust<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments are made to the value of the inventory<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Impairment losses are calculated on the goods in-process<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> if their manufacturing cost,<span class=\"_ _1\"></span> increased with the estimated amount of the costs to be incurred is higher than the net sales price at year<span class=\"_ _1\"></span>-end<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Impairment losses on inventories are anal<span class=\"_ _4\"></span>yzed on a case-<span class=\"_ _1a9\"> </span>by-case basis if the net r<span class=\"_ _4\"></span>ealizable value is low<span class=\"_ _4\"></span>er than the<span class=\"_ _1a9\"> </span>cost. The calculation of the net realizab<span class=\"_ _4\"></span>le value takes into<span class=\"_ _1a9\"> </span>account the specific characteristics of the in<span class=\"_ _4\"></span>ventories,<span class=\"_ _1\"></span> including the due date and if there ar<span class=\"_ _4\"></span>e indications of a low<span class=\"_ _1a9\"> </span>rotation.<span class=\"_ _1a9\"> </span>5.5.4 <span class=\"_ _5b\"> </span><span class=\"ls11 ws27\">Main accounting est<span class=\"_ _4\"></span>imat<span class=\"_ _4\"></span>es,<span class=\"_ _1a9\"> </span></span>assumpt<span class=\"_ _4\"></span>ions and judgments<span class=\"_ _1a9\"> </span>Reporting the financial statements in accordance with IFRS<span class=\"_ _3\"></span> requires management to r<span class=\"_ _4\"></span>ely on estimates,<span class=\"_ _1\"></span> assumptions and<span class=\"_ _3\"></span> judgments that impact the amounts reported under assets<span class=\"_ _3\"></span> and liabilities,<span class=\"_ _1\"></span> the notes on the latent assets and liabilities on the<span class=\"_ _3\"></span> date of the financial statements,<span class=\"_ _1\"></span> and the repor<span class=\"_ _3\"></span>ted amounts of<span class=\"_ _3\"></span> income and expenditure in the course of the r<span class=\"_ _4\"></span>eporting period.<span class=\"_ _1a9\"> </span>The actual results may diff<span class=\"_ _4\"></span>er from these estimates.<span class=\"_ _1a9\"> </span>The main assumptions relating to futur<span class=\"_ _4\"></span>e developments and<span class=\"_ _1a9\"> </span>the main sources of uncertainty regarding estimates on the<span class=\"_ _1a9\"> </span>reporting date are set out below:<span class=\"_ _1a9\"> </span>Going Concern - material uncertainty<span class=\"_ _1a9\"> </span>The consolidated financial statements w<span class=\"_ _4\"></span>ere prepar<span class=\"_ _4\"></span>ed on a<span class=\"_ _1a9\"> </span>going concern basis<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s cash balance at December 31<span class=\"_ _1\"></span>, 2022,<span class=\"_ _1\"></span> of 3<span class=\"_ _4\"></span>.6<span class=\"_ _1a9\"> </span>million euro is not sufficient to fund the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s operations<span class=\"_ _1a9\"> </span>during the next twelve months<span class=\"_ _4\"></span>. How<span class=\"_ _4\"></span>ever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> post-closing,<span class=\"_ _1\"></span> the<span class=\"_ _1a9\"> </span>Group entered into the A<span class=\"_ _4\"></span>tlas Subscription Agreement.<span class=\"ws0\"> </span>This committed but conditional funding w<span class=\"_ _4\"></span>ould be sufficient<span class=\"_ _1a9\"> </span>to fund operations during the next tw<span class=\"_ _4\"></span>elve months from the<span class=\"_ _1a9\"> </span>financial statement\u2019<span class=\"_ _1\"></span>s issue date. Ho<span class=\"_ _4\"></span>wever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> given the contin<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>gent nature of this funding,<span class=\"_ _4\"></span> the Group is actively exp<span class=\"_ _4\"></span>loring<span class=\"_ _1a9\"> </span>the possibility of obtaining additional funding through debt,<span class=\"_ _1\"></span> equity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> or non-dilutive funding,<span class=\"_ _4\"></span> including the licensing of<span class=\"_ _1a9\"> </span>THR-149<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> or alternatively r<span class=\"_ _4\"></span>educing its costs and invest<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments so that there should be sufficient cash to continue<span class=\"_ _1a9\"> </span>its operations during the next tw<span class=\"_ _4\"></span>elve months.<span class=\"_ _1a9\"> </span>As the net-assets of the Company ar<span class=\"_ _4\"></span>e below 61<span class=\"_ _1\"></span>,500 euro<span class=\"_ _1a9\"> </span>(the statutor<span class=\"_ _3\"></span>y minimum amount of share capital of a<span class=\"_ _1a9\"> </span>Belgian public limited liability compan<span class=\"_ _4\"></span>y)<span class=\"_ _1\"></span>, in accordance with<span class=\"_ _1a9\"> </span>article 7:229 of the BCCA,<span class=\"_ _4\"></span> each inter<span class=\"_ _4\"></span>ested party is entitled<span class=\"_ _1a9\"> </span>to request the competent commercial court to dissolve the<span class=\"_ _1a9\"> </span>Company<span class=\"_ _25\"></span>. In such instance the court may order the disso<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lution of the Company or gr<span class=\"_ _4\"></span>ant a grace period within which<span class=\"_ _1a9\"> </span>the Company is allo<span class=\"_ _4\"></span>wed to r<span class=\"_ _4\"></span>emedy the situation.<span class=\"_ _1a9\"> </span>Based on the above<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the Board of Directors considers it<span class=\"_ _1a9\"> </span>may be reasonable to expect that ther<span class=\"_ _4\"></span>e will be sufficient<span class=\"_ _1a9\"> </span>cash to continue its operations during the next tw<span class=\"_ _4\"></span>elve<span class=\"_ _1a9\"> </span>months,<span class=\"_ _1\"></span> and therefore decided to continue its valuation<span class=\"_ _1a9\"> </span>rules under the assumption of going concern. Ho<span class=\"_ _4\"></span>wever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> there is a material uncertainty relating to going concern<span class=\"_ _1a9\"> </span>of the Group because it is uncertain that the above-men<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tioned committed but conditional funding will be availab<span class=\"_ _4\"></span>le<span class=\"_ _1a9\"> </span>when needed given the conditions related to the funding,<span class=\"_ _4\"></span> and because it is not certain whether the Group will be<span class=\"_ _1a9\"> </span>able to timely obtain the necessary additional funding<span class=\"_ _1a9\"> </span>through debt,<span class=\"_ _4\"></span> equity or non-dilutive funding,<span class=\"_ _1\"></span> par<span class=\"_ _3\"></span>tnering or<span class=\"_ _1a9\"> </span>to realize sufficient cost and investment r<span class=\"_ _4\"></span>eductions.<span class=\"_ _1a9\"> </span>Convertible loans<span class=\"_ _1a9\"> </span>The Group has con<span class=\"_ _4\"></span>vertible loans with Negma and Kreos<span class=\"_ _1a9\"> </span>Capital / Pontif<span class=\"_ _4\"></span>ax V<span class=\"_ _4\"></span>entur<span class=\"_ _4\"></span>es. T<span class=\"_ _4\"></span>he convertible loans are<span class=\"_ _1a9\"> </span>measured at fair value through pr<span class=\"_ _4\"></span>ofit and loss. In deter<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mining the fair value<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the Group makes certain judgments<span class=\"_ _1a9\"> </span>on the valuation model to be applied and the probability<span class=\"_ _1a9\"> </span>that certain scenarios will occur or not in the future. The<span class=\"_ _1a9\"> </span>terms and conditions and further information is provided<span class=\"_ _1a9\"> </span>in note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.11<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Revenue from Contracts with Customer<span class=\"_ _4\"></span>s<span class=\"_ _1a9\"> </span>Under the five-step model established b<span class=\"_ _4\"></span>y the IFRS 15<span class=\"_ _1a9\"> </span>standard<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _4\"></span>s main estimates and assessments relate<span class=\"_ _1a9\"> </span>to identifying the performance obligations under its contracts<span class=\"_ _1a9\"> </span>and allocating the transaction price according to the stand-<span class=\"_ _1a9\"> </span>alone price of each of the performance obligations<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The majority of the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s sources of revenue are derived from sales of JETREA\u00ae vials through our w<span class=\"_ _4\"></span>orldwide license agreement with Inceptua and the tripartite agreement with Eumedica. The Group has determined that ther<span class=\"_ _4\"></span>e is only one performance obligation for all contracts in p<span class=\"_ _4\"></span>lace with customers,<span class=\"_ _1\"></span> that is to deliver the JETREA\u00ae product to<span class=\"_ _3\"></span> the customer<span class=\"_ _1\"></span>. Therefor<span class=\"_ _4\"></span>e,<span class=\"_ _1\"></span> the transaction price is equal to the stand-alone selling price of each vial.<span class=\"_ _1a9\"> </span><table class=\"s w1b3 h4c\" id=\"_f01cdb9e-a39a-40c4-85d3-4b63c54fedae\"><tr><td></td><td class=\"t m1 x12d h12 y5bb ff3 fsb fc7 sc0 ls1b wsbe\">STEP<span class=\"_ _108\"> </span><span class=\"ws0\">REVENUE FROM SALE OF VIALS<span class=\"_ _1a9\"> </span></span></td></tr><tr><td></td><td class=\"t m2 x296 h13 y5bc ff1 fsc fc7 sc0 ls0 ws0\">Oxurion has a contract in place </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5bd ff1 fsc fc7 sc0 ls0 ws0\">with Inceptua and Eumedica for </td></tr><tr><td class=\"t m0 x12d h14 y5be ff2 fsd fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>. Identification of the contract<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x296 h13 y5be ff1 fsc fc7 sc0 ls0 ws0\">the commercialization of JETREA\u00ae </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5bf ff1 fsc fc7 sc0 ls0 ws0\">as disclosed in Note 5<span class=\"_ _4\"></span>.8 under Key </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5c0 ff1 fsc fc7 sc0 ls0 ws0\">Agreements.<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m0 x12d h14 y5c1 ff2 fsd fc7 sc0 ls0 ws0\">2. Identification of performance  </td><td class=\"t m2 x296 h13 y5c2 ff1 fsc fc7 sc0 ls0 ws0\">In all distribution contracts,<span class=\"_ _4\"></span> ther<span class=\"_ _4\"></span>e is </td></tr><tr><td class=\"t m0 x12d h14 y5c3 ff2 fsd fc7 sc0 ls0 ws0\">obligations<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x296 h13 y5c4 ff1 fsc fc7 sc0 ls0 ws0\">only one performance obligation: </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5c5 ff1 fsc fc7 sc0 ls0 ws0\">supply of goods to a third party<span class=\"_ _1\"></span>. </td></tr><tr><td class=\"t m0 x12d h14 y5c6 ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>. Identification of the transaction price<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x296 h13 y5c7 ff1 fsc fc7 sc0 ls0 ws0\">Stand-alone price per vial is defined </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5c8 ff1 fsc fc7 sc0 ls0 ws0\">in each agreement with the customer<span class=\"_ _1\"></span>. </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5c9 ff1 fsc fc7 sc0 ls0 ws0\">As there is only one performance </td></tr><tr><td class=\"t m0 x12d h14 y5ca ff2 fsd fc7 sc0 ls0 ws0\">4. Allocation of the tr<span class=\"_ _4\"></span>ansaction price<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x296 h13 y5cb ff1 fsc fc7 sc0 ls0 ws0\">obligation,<span class=\"_ _4\"></span> there is no allocation of the </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5cc ff1 fsc fc7 sc0 ls0 ws0\">price,<span class=\"_ _4\"></span> and therefor<span class=\"_ _4\"></span>e stand-alone price </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5cd ff1 fsc fc7 sc0 ls0 ws0\">per vial is recognized<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td class=\"t m2 x296 h13 y5ce ff1 fsc fc7 sc0 ls0 ws0\">Revenue is recognized upon delivery </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5cf ff1 fsc fc7 sc0 ls0 ws0\">to the customer<span class=\"_ _4\"></span>. Returns are cr<span class=\"_ _4\"></span>edited </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5d0 ff1 fsc fc7 sc0 ls0 ws0\">strictly at discretion of Oxurion,<span class=\"_ _4\"></span> and </td></tr><tr><td class=\"t m0 x12d h14 y5d1 ff2 fsd fc7 sc0 ls0 ws0\">5<span class=\"_ _4\"></span>. Revenue recognition<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x296 h13 y5d2 ff1 fsc fc7 sc0 ls0 ws0\">a provision for US returns is made </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5d3 ff1 fsc fc7 sc0 ls0 ws0\">based on historical data. Rebate </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5d4 ff1 fsc fc7 sc0 ls0 ws0\">provisions for sales made outside the </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5d5 ff1 fsc fc7 sc0 ls0 ws0\">US<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> are made based on contractual </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5d6 ff1 fsc fc7 sc0 ls0 ws0\">agreements and/or local regulations<span class=\"_ _4\"></span>. </td></tr></table>Share-based payment plans<span class=\"_ _1a9\"> </span>The Group defines the cost of shar<span class=\"_ _4\"></span>e-based payment plans on the basis of the fair value of the equity instrument on the grant date<span class=\"_ _4\"></span>. Determining the fair value involves c<span class=\"_ _4\"></span>hoosing the most suitable valuation model for these equity instru<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments,<span class=\"_ _1\"></span> and the characteristics of the equity instrument and its issue have a decisive impact. It also assumes the input in the valuation model of a number of relevant assump<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tions,<span class=\"_ _1\"></span> such as the estimated useful life of the right,<span class=\"_ _4\"></span> volatility<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> etc. T<span class=\"_ _4\"></span>he assessments and the model are specified in mor<span class=\"_ _4\"></span>e detail in note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.8<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Capitalization and impairment of intangible assets The Group accounts for as intang<span class=\"_ _4\"></span>ible assets only rights and intellectual property if acquired from third parties and costs of internal development only if the conditions for the recognition of intangib<span class=\"_ _4\"></span>le assets are met,<span class=\"_ _1\"></span> other<span class=\"_ _23\"></span>wise such costs are included in the statement of pr<span class=\"_ _4\"></span>ofit and loss when they arise. T<span class=\"_ _4\"></span>he costs are capitalized only if the product is in Phase 3 and the chances of future success ar<span class=\"_ _4\"></span>e estimated as highly probable<span class=\"_ _4\"></span>. Accounting estimates and assess<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments of future business evo<span class=\"_ _4\"></span>lution,<span class=\"_ _4\"></span> gro<span class=\"_ _4\"></span>wth,<span class=\"_ _4\"></span> sales<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> likelihood of success and discount rate are f<span class=\"_ _4\"></span>actors used in valuing the intangible asset to execute the annual impairment test.<span class=\"_ _1a9\"> </span>T<span class=\"_ _25\"></span>axes<span class=\"_ _1a9\"> </span>The Group considers that ther<span class=\"_ _4\"></span>e is a considerab<span class=\"_ _4\"></span>le uncer<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tainty regarding the futur<span class=\"_ _4\"></span>e use of the tax losses of Oxurion as it is ver<span class=\"_ _3\"></span>y difficult to estimate the impact of the patent deduction on the future tax result at this moment. As the Group can only use the abo<span class=\"_ _4\"></span>vementioned patent deduction on the basis of a tax ruling,<span class=\"_ _4\"></span> the expectation exists that the future tax gains will be rather limited<span class=\"_ _1\"></span>. There is also the un<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>certainty regarding the future use of the tax losses with ThromboGenic<span class=\"_ _1a9\"> </span>s<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.5.<span class=\"_ _3\"></span>5 <span class=\"_ _5a\"> </span><span class=\"ls11 ws27\">Segment inf<span class=\"_ _4\"></span>ormation<span class=\"_ _1a9\"> </span></span>Segment information is repr<span class=\"_ _4\"></span>esented in a consistent manner regarding the internal r<span class=\"_ _4\"></span>eporting to the chief operating decision maker of the entity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> i.e<span class=\"_ _4\"></span>.,<span class=\"_ _4\"></span> the person or persons that takes the most important decisions,<span class=\"_ _4\"></span> enabling decision-making of allocating resources to the segment and evaluating financial performances of the segment. At this moment,<span class=\"_ _4\"></span> reporting is being done at global level within Oxurion<span class=\"_ _1a9\"> </span>5.5.5<span class=\"_ _4\"></span>.1  <span class=\"_ _109\"> </span>Product sales information<span class=\"_ _1a9\"> </span>Product sales relate only to JETREA\u00ae and ar<span class=\"_ _4\"></span>e reported in<span class=\"_ _1a9\"> </span>note 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.1.<span class=\"_ _1a9\"> </span>5.5.5<span class=\"_ _4\"></span>.2 <span class=\"_ _7a\"> </span>Geogr<span class=\"_ _4\"></span>aphic information<span class=\"_ _1a9\"> </span>The Global R&amp;D<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> Clinical Operations and most of the<span class=\"_ _1a9\"> </span>General and Administr<span class=\"_ _4\"></span>ative functions are located in<span class=\"_ _1a9\"> </span>Leuven,<span class=\"_ _4\"></span> Belgium. T<span class=\"_ _4\"></span>hese operations repr<span class=\"_ _4\"></span>esent approxi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mately 95% of the operating r<span class=\"_ _4\"></span>esult. In the context of the<span class=\"_ _1a9\"> </span>Company\u2019<span class=\"_ _1\"></span>s business<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> these activities do not lead to the<span class=\"_ _1a9\"> </span>need for geographic information.<span class=\"_ _1a9\"> </span>100% of intangible assets and almost all non-curr<span class=\"_ _4\"></span>ent<span class=\"_ _1a9\"> </span>assets are located in Belgium.<span class=\"_ _1a9\"> </span>5.5.5<span class=\"_ _4\"></span>.3 <span class=\"_ _10a\"> </span>Business unit reporting<span class=\"_ _1a9\"> </span>Oxurion is a biotechnology company with focus on<span class=\"_ _1a9\"> </span>diseases related to the retina.<span class=\"_ _1a9\"> </span>Our molecules,<span class=\"_ _1\"></span> ocriplasmin on the market with brand<span class=\"_ _1a9\"> </span>name JETREA\u00ae,<span class=\"_ _4\"></span> the plasma kallikr<span class=\"_ _4\"></span>ein inhibitor in a Phase<span class=\"_ _1a9\"> </span>2 clinical trial and the pan-RGD integrin inhibitor which is<span class=\"_ _1a9\"> </span>currently on ho<span class=\"_ _4\"></span>ld<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> represent more than 95% of the income<span class=\"_ _1a9\"> </span>and expenses of the Company<span class=\"_ _25\"></span>. As a consequence,<span class=\"_ _1\"></span> the<span class=\"_ _1a9\"> </span>consolidated statement of profit and loss and of financial<span class=\"_ _1a9\"> </span>position are a valid repr<span class=\"_ _4\"></span>esentation of its business unit as a<span class=\"_ _1a9\"> </span>whole<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.5.5<span class=\"_ _4\"></span>.4 <span class=\"_ _10a\"> </span>Information about major customers<span class=\"_ _1a9\"> </span>Oxurion has one customer that individually accounts for<span class=\"_ _1a9\"> </span>more than 7<span class=\"_ _25\"></span>4% of the total income at the end of 2022<span class=\"_ _1a9\"> </span>(2021: 73%)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.5.6<span class=\"_ _3\"></span> <span class=\"_ _59\"> </span><span class=\"ls11 ws27\">Financial inst<span class=\"_ _4\"></span>ruments<span class=\"_ _1a9\"> </span></span>The Compan<span class=\"_ _4\"></span>y has the following financial instr<span class=\"_ _4\"></span>uments<span class=\"_ _1a9\"> </span>measured at amortized cost: trade receivables<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> cash and<span class=\"_ _1a9\"> </span>cash equivalents,<span class=\"_ _1\"></span> investments,<span class=\"_ _4\"></span> trade payab<span class=\"_ _4\"></span>les,<span class=\"_ _1\"></span> lease liabili<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ties and other short term liabilities.<span class=\"_ _1a9\"> </span>As of December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> the majority of cash and cash<span class=\"_ _1a9\"> </span>equivalents are cash at banks availab<span class=\"_ _4\"></span>le on demand<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Besides these financial instruments,<span class=\"_ _1\"></span> the Company also<span class=\"_ _1a9\"> </span>issued convertible bonds measured at fair value through<span class=\"_ _1a9\"> </span>profit and los since 2021 with two parties as described in<span class=\"_ _1a9\"> </span>note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.11<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial assets and financial liabilities are included in the<span class=\"_ _1a9\"> </span>Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s statement of financial position when the Group<span class=\"_ _1a9\"> </span>becomes a party to the contractual provisions of the<span class=\"_ _1a9\"> </span>instrument.<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>air V<span class=\"_ _4\"></span>alues<span class=\"_ _1a9\"> </span>There is no significant diff<span class=\"_ _4\"></span>erence between <span class=\"_ _4\"></span>the fair value<span class=\"_ _1a9\"> </span>and carr<span class=\"_ _3\"></span>ying amount of the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _4\"></span>s cash and cash equiv<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>alents,<span class=\"_ _1\"></span> investments,<span class=\"_ _4\"></span> trade and other r<span class=\"_ _4\"></span>eceivables<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> other<span class=\"_ _1a9\"> </span>current assets<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> trade payab<span class=\"_ _4\"></span>les and other current liabilities<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The carrying amount of cash and cash equivalents and<span class=\"_ _1a9\"> </span>investments is equal to their fair value<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> given the shor<span class=\"_ _3\"></span>t-<span class=\"_ _1a9\"> </span>term maturity of these financial instruments<span class=\"_ _4\"></span>. Similarly<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> the<span class=\"_ _1a9\"> </span>carr<span class=\"_ _3\"></span>ying amounts of receivables and payab<span class=\"_ _4\"></span>les,<span class=\"_ _1\"></span> which are<span class=\"_ _1a9\"> </span>all subject to normal trade credit terms<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> ar<span class=\"_ _4\"></span>e equivalent to<span class=\"_ _1a9\"> </span>their fair values<span class=\"_ _4\"></span>. Investments in bonds are measur<span class=\"_ _4\"></span>ed at<span class=\"_ _1a9\"> </span>fair value based on quoted market prices<span class=\"_ _4\"></span>. The fair value<span class=\"_ _1a9\"> </span>movements ar<span class=\"_ _4\"></span>e recorded in OCI<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The class A Negma con<span class=\"_ _4\"></span>vertible loan is measured at fair<span class=\"_ _1a9\"> </span>value as the nominal amount of the convertible loan plus<span class=\"_ _1a9\"> </span>8%,<span class=\"_ _4\"></span> which is the diff<span class=\"_ _4\"></span>erence betw<span class=\"_ _4\"></span>een the share price and<span class=\"_ _1a9\"> </span>the 92% of the low<span class=\"_ _4\"></span>est closing VW<span class=\"_ _25\"></span>AP (8%) (level 1)<span class=\"_ _4\"></span>. The<span class=\"_ _1a9\"> </span>class B Negma convertible loan is measured at f<span class=\"_ _4\"></span>air value as the nominal amount of the convertible loan plus 20%,<span class=\"_ _1\"></span> which is the differ<span class=\"_ _4\"></span>ence between the share prices and 80% of the closing VW<span class=\"_ _25\"></span>AP (20%) (level 1).<span class=\"_ _1a9\"> </span>The Kreos Capital / P<span class=\"_ _4\"></span>ontifax V<span class=\"_ _1\"></span>entures convertible loan is measured at fair value wher<span class=\"_ _4\"></span>eby fair value is estimated considering probabilities of the occurrence of diff<span class=\"_ _4\"></span>erent scenarios. T<span class=\"_ _4\"></span>he probabilities are estimated b<span class=\"_ _4\"></span>y the Group and consist level 3 fair value assessments<span class=\"_ _4\"></span>. A reasonable change of the probabilities betw<span class=\"_ _4\"></span>een the different scenario<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s would not lead to a material c<span class=\"_ _4\"></span>hange in the fair value<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>5.5.7<span class=\"_ _3\"></span> <span class=\"_ _5e\"> </span><span class=\"ls11 ws27\">Financial ri<span class=\"_ _4\"></span>sk manag<span class=\"_ _4\"></span>ement<span class=\"_ _1a9\"> </span></span>The financial department of the parent Company coor<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>dinates access to the national and international financial markets and considers and manages the financial risks relating to the activities of the Group<span class=\"_ _1\"></span>. The financial risks related to the operating activities of the Gr<span class=\"_ _4\"></span>oup are confined to a minimal currency exc<span class=\"_ _4\"></span>hange rate risk. Ther<span class=\"_ _4\"></span>e are no risks worth mentioning,<span class=\"_ _4\"></span> such as liquidity risks or interest rate risks as the Group has no debts with variab<span class=\"_ _4\"></span>le interest rates<span class=\"_ _4\"></span>. The Group does not b<span class=\"_ _4\"></span>uy or trade in financial instru<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments for speculative purposes<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>(A) <span class=\"_ _41\"> </span>CAPIT<span class=\"_ _25\"></span>AL MANA<span class=\"_ _4\"></span>GEMENT<span class=\"_ _1a9\"> </span>The Group manages its capital with the aim of ensuring that the Group can continue to operate<span class=\"_ _4\"></span>. At the same time,<span class=\"_ _1\"></span> the Group wishes to generate a return for its stake<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>holders via the results of its r<span class=\"_ _4\"></span>esearch activities<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> which in turn are expected to lead to an increase in the value of the Company\u2019<span class=\"_ _1\"></span>s shares<span class=\"_ _4\"></span>. This str<span class=\"_ _4\"></span>ateg<span class=\"_ _3\"></span>y has not changed compared to previous y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The capital structur<span class=\"_ _4\"></span>e of the Group consists of investments,<span class=\"_ _1\"></span> cash,<span class=\"_ _4\"></span> cash equivalents and restricted cash,<span class=\"_ _1\"></span> and equity at<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tributable to the equity ho<span class=\"_ _4\"></span>lders of the Company<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> inc<span class=\"_ _4\"></span>luding capital,<span class=\"_ _4\"></span> reserves and results carried over<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> as indicated in notes 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.7<span class=\"_ _4\"></span> and 5<span class=\"_ _1\"></span>.7<span class=\"_ _25\"></span>.8 respectively<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>The Group manages its capital structur<span class=\"_ _4\"></span>e and makes the necessar<span class=\"_ _3\"></span>y adjustments in light of changes in economic circumstances,<span class=\"_ _1\"></span> the risk characteristics of the underlying assets and the projected cash requir<span class=\"_ _4\"></span>ements of current researc<span class=\"_ _4\"></span>h activities. When assessing the capital structur<span class=\"_ _4\"></span>e<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the current cash position and projected cash b<span class=\"_ _4\"></span>urn are used as the key parameters<span class=\"_ _4\"></span>. Cash burn is defined as the net result corr<span class=\"_ _4\"></span>ected for depreciation and amortization,<span class=\"_ _4\"></span> stock<span class=\"_ _1\"></span>-<span class=\"_ _1a9\"> </span>based compensation,<span class=\"_ _4\"></span> and less investments in fixed assets<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The Group wishes to maintain a capital structur<span class=\"_ _4\"></span>e that is sufficient to fund researc<span class=\"_ _4\"></span>h activities during a period of at least twelve months<span class=\"_ _4\"></span>. Any cash infl<span class=\"_ _4\"></span>ows from possib<span class=\"_ _4\"></span>le coop<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>eration agreements or other cash gener<span class=\"_ _4\"></span>ating activities are not taken into account. T<span class=\"_ _25\"></span>o maintain the capital structure,<span class=\"_ _1\"></span> the Group can issue new shares or conc<span class=\"_ _4\"></span>lude new (B) <span class=\"_ _56\"> </span>MAIN A<span class=\"_ _4\"></span>CCOUNTING PRINCIPLES<span class=\"_ _1a9\"> </span>Details of the main accounting principles and methods,<span class=\"_ _1\"></span> including the inclusion criteria,<span class=\"_ _1\"></span> the valuation basis,<span class=\"_ _4\"></span> and the basis on which income and costs are r<span class=\"_ _4\"></span>ecognized<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> for each categor<span class=\"_ _3\"></span>y of financial assets,<span class=\"_ _4\"></span> liabilities<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and equity instru<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments,<span class=\"_ _1\"></span> are explained under 5<span class=\"_ _1\"></span>.5<span class=\"_ _4\"></span>.3<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>(C) <span class=\"_ _35\"> </span>CA<span class=\"_ _25\"></span>TEGORIES OF FINANCIAL INS<span class=\"_ _4\"></span>TRUMENTS<span class=\"_ _1a9\"> </span>The financial instruments curr<span class=\"_ _4\"></span>ently held by the Compan<span class=\"_ _4\"></span>y are:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>T<span class=\"_ _1\"></span>rade receivables and payab<span class=\"_ _4\"></span>les<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Shor<span class=\"_ _3\"></span>t-term financial liabilities<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws108\">Cash, cash equivalents and in<span class=\"_ _4\"></span>vestments (we r<span class=\"_ _4\"></span>efer to </span>note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.6) amounting to 3<span class=\"_ _1\"></span>.6 million euro (2021: 10<span class=\"_ _1\"></span>.0 million euro)<span class=\"_ _4\"></span>. In<span class=\"_ _4\"></span>vestments are mainly in very low risk bonds and term investments<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Conver<span class=\"_ _3\"></span>tible bonds (we r<span class=\"_ _4\"></span>efer to note 5<span class=\"_ _1\"></span>.5<span class=\"_ _4\"></span>.6<span class=\"_ _1a9\"> </span>)<span class=\"_ _1a9\"> </span>(D) <span class=\"_ _41\"> </span>MARKET RISK<span class=\"_ _1a9\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s activities are such that the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s income is<span class=\"_ _1a9\"> </span> exposed to financial risks arising from currency exc<span class=\"_ _4\"></span>hange<span class=\"_ _1a9\"> </span> rate fluctuations because a substantial proportion of<span class=\"_ _1a9\"> </span> the researc<span class=\"_ _4\"></span>h expenditure is invoiced in USD and pound<span class=\"_ _1a9\"> </span> sterling (GBP)<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he Group tries to compensate the inflo<span class=\"_ _4\"></span>ws<span class=\"_ _1a9\"> </span> and outflows in f<span class=\"_ _4\"></span>oreign currenc<span class=\"_ _1a9\"> </span>y<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>Analysis of sensitivity to exchange r<span class=\"_ _4\"></span>ates<span class=\"_ _1a9\"> </span>The Group is mainly exposed to fluctuations in GBP and<span class=\"_ _1a9\"> </span> USD against the euro<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The sensitivity of loss to changes in the exc<span class=\"_ _4\"></span>hange rates<span class=\"_ _1a9\"> </span> arises mainly from USD and GBP denominated financial<span class=\"_ _1a9\"> </span> instruments<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span><table class=\"s w1b4 h4d\" id=\"_dd1e7635-0d12-4b2b-a1ff-eab6487d2add\"><tr><td class=\"c n x129 y5d7 w1b5 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">N '000 EURO<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x297 y5d7 w1b6 h41\" colspan=\"2\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IMP<span class=\"_ _1\"></span>ACT ON P<span class=\"_ _4\"></span>AS<span class=\"_ _4\"></span>T T<span class=\"_ _1\"></span>AX LOSS<span class=\"_ _1a9\"> </span></div></td></tr><tr><td></td><td class=\"c n x298 y5d8 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x299 y5d8 w1b7 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y5d9 ff2 fsd fc7 sc0 ls0 ws0\">USD/euro exchange rate increase 10%<span class=\"_ _1a9\"> </span></td><td class=\"c n x29a y5da wad h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">163<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x29b y5da w1b8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-339<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y5db ff2 fsd fc7 sc0 ls0 ws0\">USD/euro exchange rate decrease 10%<span class=\"_ _1a9\"> </span></td><td class=\"c n x29c y5dc w1b9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-200<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x29d y5dc w1ba h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls4d ws252\">41<span class=\"_ _3\"></span>5<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y5dd ff2 fsd fc7 sc0 ls0 ws0\">GBP/euro exchange rate increase 10%<span class=\"_ _1a9\"> </span></td><td class=\"c n x29e y518 w1bb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x29f y518 w1bc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">6<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y5de ff2 fsd fc7 sc0 ls0 ws0\">GBP/euro exchange rate decrease 10%<span class=\"_ _1a9\"> </span></td><td class=\"c n x2a0 y515 w150 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-9<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a1 y515 w14d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-<span class=\"_ _1a9\"> </span>7<span class=\"_ _1a9\"> </span></div></td></tr></table>(E) <span class=\"_ _74\"> </span>INTERES<span class=\"_ _4\"></span>T RISK MANA<span class=\"_ _4\"></span>GEMENT<span class=\"_ _1a9\"> </span>At the moment,<span class=\"_ _1\"></span> the Group has external debt financing<span class=\"_ _1a9\"> </span> with a fixed interest rate<span class=\"_ _4\"></span>. The Gr<span class=\"_ _4\"></span>oup does not have an<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span> contracts with a variable inter<span class=\"_ _4\"></span>est rate<span class=\"_ _4\"></span>. Consequently<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> there<span class=\"_ _1a9\"> </span> is currently no need f<span class=\"_ _4\"></span>or a specific interest risk manage<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ment policy in the Group<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>(F) <span class=\"_ _74\"> </span>CREDIT RISK MANA<span class=\"_ _4\"></span>GEMENT<span class=\"_ _1a9\"> </span>Credit risk relates to the risk that a counterparty will fail to<span class=\"_ _1a9\"> </span> fulfil their contractual ob<span class=\"_ _4\"></span>ligations with the result that the<span class=\"_ _1a9\"> </span> Group would suff<span class=\"_ _4\"></span>er a loss. T<span class=\"_ _4\"></span>he Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s policy focuses on<span class=\"_ _1a9\"> </span> only working with cr<span class=\"_ _4\"></span>edit-worthy counterparties and<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> where<span class=\"_ _1a9\"> </span> necessar<span class=\"_ _3\"></span>y<span class=\"_ _25\"></span>, r<span class=\"_ _4\"></span>equiring adequate securities. Inf<span class=\"_ _4\"></span>ormation about<span class=\"_ _1a9\"> </span> the creditw<span class=\"_ _4\"></span>orthiness of counterpar<span class=\"_ _3\"></span>ties is provided by inde<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>pendent ratings agencies and<span class=\"_ _1\"></span>, if this is not a<span class=\"_ _4\"></span>vailable<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the<span class=\"_ _1a9\"> </span> Group uses information that is pub<span class=\"_ _4\"></span>licly availab<span class=\"_ _4\"></span>le as well<span class=\"_ _1a9\"> </span> as its own internal r<span class=\"_ _4\"></span>ecords. Cr<span class=\"_ _4\"></span>edit risk is managed by the<span class=\"_ _1a9\"> </span> financial department of Oxurion by means of individual<span class=\"_ _1a9\"> </span> follo<span class=\"_ _4\"></span>w-up of credit per counterparty<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The Group has a limited number of customer<span class=\"_ _4\"></span>s. Cr<span class=\"_ _4\"></span>edit<span class=\"_ _1a9\"> </span> risk is considered as remote due to a history of no issues<span class=\"_ _1a9\"> </span> with payment collection. So far<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the collection of payments<span class=\"_ _1a9\"> </span> happened without any delay and with limited cr<span class=\"_ _4\"></span>edit risk.<span class=\"_ _1a9\"> </span>The credit risk on cash in<span class=\"_ _4\"></span>vestments is limited given that the<span class=\"_ _1a9\"> </span> counterparties are banks with high credit scores attributed<span class=\"_ _1a9\"> </span> by international r<span class=\"_ _4\"></span>ating agencies<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>(G) <span class=\"_ _35\"> </span>LIQUIDITY RISK MANA<span class=\"_ _1\"></span>GEMENT<span class=\"_ _1a9\"> </span>The Group manages its liquidity risk b<span class=\"_ _4\"></span>y ensuring adequate reser<span class=\"_ _3\"></span>ves and by constantly c<span class=\"_ _4\"></span>hecking the projected and actual cash flows<span class=\"_ _4\"></span>. A<span class=\"_ _4\"></span>t the moment,<span class=\"_ _4\"></span> the Group is not subject to any substantial liquidity risk.<span class=\"_ _1a9\"> </span>Contractual undiscounted maturities of financial liabilities at December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021 and 2022 are as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span><table class=\"s w1bd h4e\" id=\"_b7fa71f0-875d-4b8e-9040-198dc456c426\"><tr><td class=\"t m1 x12d h12 y5df ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T<span class=\"_ _3\"></span> <span class=\"ls0\"> </span></td><td class=\"c n x2a2 y5e0 w1be h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">LESS THAN 6 MONTHS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a3 y5e0 w1bf h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">6 - 12 MONTHS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a4 y5e0 w1c0 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">BETWEEN 1 AND 2 YEARS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a5 y5e0 w1c1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">BETWEEN 2 AND 5 YEARS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a6 y5e0 w1c2 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">OVER 5 YEARS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a7 y5e0 w1c3 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m1 x12d h12 y5e1 ff3 fsb fc7 sc0 ls1b ws0\">31 DECEMBER 2021)<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y5e2 wfd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Lease liabilities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a8 y5e2 w3b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">162<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x219 y5e2 w4a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">59<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a9 y5e2 w1c4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">30<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2aa y5e2 w1c5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">15<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ab y5e2 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ac y5e2 w1c6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">266<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5e3 w103 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Convertible loans<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ad y5e3 w1c7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">300<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ae y5e3 w1c8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,910<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2af y5e3 w1c9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,464<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b0 y5e3 w1ca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">5<span class=\"_ _4\"></span>,187<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b1 y5e3 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b2 y5e3 wca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">11<span class=\"_ _4\"></span>,861<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5e4 w108 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>rade payables<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b3 y5e4 w1cb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,979<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b4 y5e4 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b5 y5e4 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b6 y5e4 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b7 y5e4 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b8 y5e4 w1cc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,979<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5e5 w10d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other short-term liabilities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b9 y5e5 w1cd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">628<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ba y5e5 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2bb y5e5 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2bc y5e5 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2bd y5e5 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2be y5e5 w1cd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">628<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5e6 w1ce h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal financial liabilities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2bf y5e6 w1cf h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">6<span class=\"_ _1\"></span>,069<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c0 y5e6 w1d0 h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">1,969<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c1 y5e6 w1d1 h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">4,494<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c2 y5e6 w1d2 h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">5,202<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c3 y5e6 w1d3 h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c4 y5e6 w1d4 h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">17<span class=\"_ _1\"></span>,734<span class=\"_ _1a9\"> </span></div></td></tr></table>N '000 EURO (AS A<span class=\"_ _1\"></span>T<span class=\"_ _3\"></span> <span class=\"ls0\"> </span>31 DECEMBER 2022)<span class=\"_ _1a9\"> </span>LESS THAN 6 MONTHS<span class=\"_ _100\"> </span>6 - 12 MONTHS<span class=\"_ _1e\"> </span>BETWEEN 1 AND 2 YEARS<span class=\"_ _1d\"> </span>BETWEEN 2 AND 5 YEARS<span class=\"_ _2b\"> </span>OVER 5 YEARS<span class=\"_ _17\"> </span><span class=\"ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _1a9\"> </span></span>Lease liabilities<span class=\"_ _14\"> </span>88<span class=\"_ _fc\"> </span>78<span class=\"_ _57\"> </span>144<span class=\"_ _114\"> </span>389<span class=\"_ _114\"> </span>394<span class=\"_ _116\"> </span>1<span class=\"_ _4\"></span>,093<span class=\"_ _1a9\"> </span>Convertible loans<span class=\"_ _117\"> </span>1<span class=\"_ _4\"></span>,728<span class=\"_ _111\"> </span>1,728<span class=\"_ _6f\"> </span>3<span class=\"_ _4\"></span>,456<span class=\"_ _57\"> </span><span class=\"ls4d ws252\">5<span class=\"_ _23\"></span>41<span class=\"_ _85\"> </span></span>0<span class=\"_ _116\"> </span>7<span class=\"_ _1\"></span>,453<span class=\"_ _1a9\"> </span>T<span class=\"_ _1\"></span>rade payables<span class=\"_ _118\"> </span>5<span class=\"_ _4\"></span>,040<span class=\"_ _85\"> </span>0<span class=\"_ _112\"> </span>0<span class=\"_ _85\"> </span>0<span class=\"_ _112\"> </span>0<span class=\"_ _6f\"> </span>5<span class=\"_ _4\"></span>,040<span class=\"_ _1a9\"> </span>Other short-term liabilities<span class=\"_ _10f\"> </span>2,813<span class=\"_ _85\"> </span>0<span class=\"_ _112\"> </span>0<span class=\"_ _85\"> </span>0<span class=\"_ _85\"> </span>0<span class=\"_ _116\"> </span>2,813<span class=\"_ _1a9\"> </span>T<span class=\"_ _1\"></span>otal financial liabilities<span class=\"_ _10d\"> </span>9<span class=\"_ _1\"></span>,669<span class=\"_ _6f\"> </span>1,806<span class=\"_ _29\"> </span>3<span class=\"_ _4\"></span>,600<span class=\"_ _17\"> </span>930<span class=\"_ _10d\"> </span>394<span class=\"_ _88\"> </span>16<span class=\"_ _1\"></span>,399<span class=\"_ _1a9\"> </span>5.5.<span class=\"_ _3\"></span>8 <span class=\"_ _5a\"> </span><span class=\"ls0 ws0\">Remunera<span class=\"_ _4\"></span>tio<span class=\"_ _4\"></span>n of Key </span>Managemen<span class=\"_ _4\"></span>t Personnel<span class=\"_ _1a9\"> </span>Key management personnel wer<span class=\"_ _4\"></span>e constituted in 2022 of:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>T<span class=\"_ _1\"></span>om Graney \u2013 CEO<span class=\"_ _1a9\"> </span>The key management personnel constitute the CEO as per Company\u2019<span class=\"_ _1\"></span>s corporate c<span class=\"_ _4\"></span>hapter<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Remuneration of key management personnel w<span class=\"_ _4\"></span>as as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span><table class=\"s w1d5 h50\" id=\"_011b3fee-bd93-47df-9c7d-4a4e43b3cf94\"><tr><td class=\"t m1 x12d h12 y5e7 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (EXCEPT FOR THE NUMBER OF ST<span class=\"_ _4\"></span>OCK </td><td class=\"c n x2c5 y5e8 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c6 y5e8 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m1 x12d h12 y5e9 ff3 fsb fc7 sc0 ls1b ws0\">OPTIONS) (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y5ea w1d6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Short-term benefits - consultancy fees / salar<span class=\"_ _3\"></span>y<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c7 y5ea w1d7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">562<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c8 y5ea w102 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">652<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5eb w1d8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ermination benefits<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c9 y5eb w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ca y5eb w1d9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">159<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ec w1da h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Cost of stock options granted in the year<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2cb y5ec w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2cc y5ec w1db h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">662<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w1dc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Number of stock options granted in the year<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2cd y515 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ce y515 w1dd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">600<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span></div></td></tr></table>No loans,<span class=\"_ _1\"></span> quasi-loans or other guarantees have been given to any of the executive dir<span class=\"_ _4\"></span>ectors<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSummaryOfSignificantAccountingPoliciesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-125": {
   "value": "5.5<span class=\"_ _3\"></span> <span class=\"_ _b\"> </span><span class=\"ls0 ws0\">GENERAL NO<span class=\"_ _4\"></span>TES T<span class=\"_ _1\"></span>O </span>THE CON<span class=\"_ _3\"></span>SOLIDA<span class=\"_ _25\"></span>TED FI<span class=\"_ _3\"></span>NA<span class=\"_ _3\"></span>N<span class=\"_ _3\"></span>CI<span class=\"_ _3\"></span>AL<span class=\"_ _3\"></span> ST<span class=\"_ _1\"></span>A<span class=\"_ _1\"></span>TEM<span class=\"_ _3\"></span>EN<span class=\"_ _3\"></span>TS<span class=\"_ _1a9\"> </span>5.5.<span class=\"_ _4\"></span>1 <span class=\"_ _58\"> </span><span class=\"ls0 ws0\">Reporting ent<span class=\"_ _4\"></span>ity<span class=\"_ _1a9\"> </span></span>Oxurion is a public limited liability compan<span class=\"_ _4\"></span>y (in Dutch: Naamloze V<span class=\"_ _4\"></span>ennootsc<span class=\"_ _4\"></span>hap) established under Belgian law with its reg<span class=\"_ _4\"></span>istered office at Gaston Geenslaan 1<span class=\"_ _1\"></span>, B-3001 Leuven,<span class=\"_ _4\"></span> with tw<span class=\"_ _4\"></span>o wholly o<span class=\"_ _4\"></span>wned subsidiaries \u2013 ThromboGenics and Oncurious (wholl<span class=\"_ _4\"></span>y owned as of December 14<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022)<span class=\"_ _1\"></span>. Oxurion,<span class=\"_ _4\"></span> ThromboGenics and Oncurious are biopharmaceutical companies focusing on the development of new drugs for the treatment of ey<span class=\"_ _4\"></span>e diseases and cancer<span class=\"_ _1\"></span>. The Group has built a pipeline of drug candidates,<span class=\"_ _1\"></span> one of which is actively in the clinic<span class=\"_ _4\"></span>. The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s research and development facilities are located in Belgium.<span class=\"_ _1a9\"> </span>The consolidated financial statements of Oxurion for the year ending December 3<span class=\"_ _4\"></span>1<span class=\"_ _1\"></span>, 2022,<span class=\"_ _1\"></span> include the entire Group<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>These consolidated financial statements w<span class=\"_ _4\"></span>ere appro<span class=\"_ _4\"></span>ved by the Board of Dir<span class=\"_ _4\"></span>ectors on March 30<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> 2023<span class=\"_ _1\"></span>. Possible changes to this Annual Report can be carried out until the A<span class=\"_ _4\"></span>GM of May 2,<span class=\"_ _4\"></span> 2023<span class=\"_ _1a9\"> </span><span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>5.5.<span class=\"_ _3\"></span>2<span class=\"_ _3\"></span> <span class=\"_ _5a\"> </span><span class=\"ls0 ws0\">Applica<span class=\"_ _4\"></span>ti<span class=\"_ _4\"></span>on of new and r<span class=\"_ _4\"></span>evised </span>standar<span class=\"_ _4\"></span>ds and in<span class=\"_ _4\"></span>ter<span class=\"_ _4\"></span>pret<span class=\"_ _4\"></span>ati<span class=\"_ _4\"></span>ons t<span class=\"_ _4\"></span>o the consol<span class=\"_ _4\"></span>idat<span class=\"_ _4\"></span>ed financi<span class=\"_ _4\"></span>al stat<span class=\"_ _4\"></span>ements<span class=\"_ _1a9\"> </span>New Standards,<span class=\"_ _1\"></span> Interpretations and Amendments adopted by the Group<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>During 2022,<span class=\"_ _4\"></span> the Group has adopted all the new and revised Standards and Interpr<span class=\"_ _4\"></span>etations issued by the International Accounting Standards Board (<span class=\"ff3 ws0\">\u201cIASB\u201d</span>) and the IFRS Interpretations Committee (<span class=\"ff3 ws73\">\u201cIFRS IC\u201d</span>) of the IASB as adopted by the European Union (<span class=\"ff3 ws0\">\u201cEU\u201d</span>) and effective for the accounting y<span class=\"_ _4\"></span>ear starting on Januar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022. The Group has not app<span class=\"_ _4\"></span>lied any new IFRS r<span class=\"_ _4\"></span>equire<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments that are not y<span class=\"_ _4\"></span>et effective as of December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>The follo<span class=\"_ _4\"></span>wing new Standards<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> Interpretations and Amendments issued by the IASB and the IFRS IC as adopted by the European Union ar<span class=\"_ _4\"></span>e effective for the financial period:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws22c\">Amendment to IFRS 16 Leases: COVID-19-Related </span>Rent Concessions beyond 30 J<span class=\"_ _4\"></span>une 2021 (applicable for annual periods beginning on or after 1 April 1<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021)<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws192\">Amendments to IAS 16 Proper<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>, Plant and Equipment: </span>Proceeds before Intended Use (app<span class=\"_ _4\"></span>licable for ann<span class=\"_ _4\"></span>ual periods beginning on or after 1 J<span class=\"_ _4\"></span>anuar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022)<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws230\">Amendments to IAS 37 Pr<span class=\"_ _4\"></span>ovisions<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> Contingent </span>Liabilities and Contingent Assets: Onerous Contracts \u2014 Cost of F<span class=\"_ _1\"></span>ulfilling a Contract (applicable for ann<span class=\"_ _4\"></span>ual periods beginning on or after 1 J<span class=\"_ _4\"></span>anuar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,2022)<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws231\">Amendments to IFRS 3 Business Combinations: </span>Reference to the Conceptual F<span class=\"_ _1\"></span>ramework (app<span class=\"_ _4\"></span>licable for annual periods beginning on or after 1 J<span class=\"_ _4\"></span>anuary 1,<span class=\"_ _1\"></span> 2022)<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws14b\">Annual Improvements to IFRS Standards 2018\u20132020 </span>(applicable f<span class=\"_ _4\"></span>or annual periods beginning on or after 1 Jan<span class=\"_ _4\"></span>uar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022)<span class=\"_ _1a9\"> </span>The adoption of these new standards and amendments has not led to major changes in the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s accounting policies<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Standards and Interpretations issued b<span class=\"_ _4\"></span>ut not yet effective in the current year<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The Group elected not to earl<span class=\"_ _4\"></span>y adopt the following new Standards,<span class=\"_ _1\"></span> Interpretations and Amendments,<span class=\"_ _4\"></span> whic<span class=\"_ _4\"></span>h have been issued by the IASB and the IFRS IC b<span class=\"_ _4\"></span>ut are not yet mandator<span class=\"_ _3\"></span>y for December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> reporting periods and/<span class=\"_ _1a9\"> </span>or not yet adopted b<span class=\"_ _4\"></span>y the EU as per December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022<span class=\"_ _1a9\"> </span>:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws1c6\">IFRS 17 Insur<span class=\"_ _4\"></span>ance Contracts (app<span class=\"_ _4\"></span>licable for annual<span class=\"_ _1a9\"> </span></span><span class=\"ws1c6\"> </span>5.5.<span class=\"_ _3\"></span>3<span class=\"_ _3\"></span> <span class=\"_ _59\"> </span><span class=\"ls0 ws0\">Basis of pr<span class=\"_ _4\"></span>epara<span class=\"_ _4\"></span>tion and s<span class=\"_ _4\"></span>ignifica<span class=\"_ _4\"></span>nt<span class=\"_ _1a9\"> </span></span><span class=\"ls0 ws0\"> </span>periods beginning on or after J<span class=\"_ _4\"></span>anuar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2023)<span class=\"_ _1a9\"> </span> accounti<span class=\"_ _3\"></span>ng p<span class=\"_ _3\"></span>olicie<span class=\"_ _3\"></span>s<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws16d\">Amendments to IFRS 17 Insur<span class=\"_ _4\"></span>ance contracts: Initial<span class=\"_ _1a9\"> </span></span><span class=\"ws16d\"> </span>Application of IFRS 17<span class=\"_ _1\"></span> and IFRS 9 \u2013 Comparative<span class=\"_ _1a9\"> </span> The main basis adopted when preparing these conso<span class=\"_ _4\"></span>lidat<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>Information (applicab<span class=\"_ _4\"></span>le for annual periods beginning<span class=\"_ _1a9\"> </span> ed financial statements are set out belo<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span> on or after Jan<span class=\"_ _4\"></span>uar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2023)<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws232\">Amendments to IAS 1 Presentation of F<span class=\"_ _4\"></span>inancial<span class=\"_ _1a9\"> </span></span><span class=\"ws232\"> </span>(A) <span class=\"_ _41\"> </span>S<span class=\"_ _4\"></span>T<span class=\"_ _25\"></span>A<span class=\"_ _25\"></span>TEMENT OF COMPLIANCE<span class=\"_ _1a9\"> </span>Statements: Classification of Liabilities as Current or<span class=\"_ _1a9\"> </span> Non-current (app<span class=\"_ _4\"></span>licable for annual periods beginning<span class=\"_ _1a9\"> </span> These consolidated financial statements w<span class=\"_ _4\"></span>ere prepar<span class=\"_ _4\"></span>ed<span class=\"_ _1a9\"> </span> on or after Jan<span class=\"_ _4\"></span>uar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 202<span class=\"_ _4\"></span>4 or later<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> b<span class=\"_ _4\"></span>ut not yet endorsed<span class=\"_ _1a9\"> </span> in accordance with the IFRS as issued by the IASB and<span class=\"_ _1a9\"> </span> in the EU)<span class=\"_ _1a9\"> </span>adopted by the EU<span class=\"_ _1\"></span>. The consolidated financial statements<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _62\"> </span><span class=\"ws232\">Amendments to IAS 1 Presentation of F<span class=\"_ _4\"></span>inancial<span class=\"_ _1a9\"> </span></span><span class=\"ws232\"> </span>are presented in thousands of eur<span class=\"_ _4\"></span>o except per share<span class=\"_ _1a9\"> </span> Statements and IFRS Practice Statement 2: Disclosur<span class=\"_ _4\"></span>e<span class=\"_ _1a9\"> </span> amounts which are in eur<span class=\"_ _4\"></span>o<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>of Accounting P<span class=\"_ _4\"></span>olicies (applicable f<span class=\"_ _4\"></span>or annual periods<span class=\"_ _1a9\"> </span> beginning on or after J<span class=\"_ _4\"></span>anuar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2023)<span class=\"_ _1a9\"> </span>(B) <span class=\"_ _56\"> </span>GOING CONCERN - MA<span class=\"_ _25\"></span>TERIAL<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _62\"> </span><span class=\"wsda\">Amendments to IAS 8 Accounting policies,<span class=\"_ _4\"></span> Changes<span class=\"_ _1a9\"> </span></span><span class=\"wsda\"> </span>UNCERT<span class=\"_ _25\"></span>AINTY<span class=\"_ _1a9\"> </span>in Accounting Estimates and Errors: Definition of<span class=\"_ _1a9\"> </span> Accounting Estimates (applicab<span class=\"_ _4\"></span>le for annual periods<span class=\"_ _1a9\"> </span> The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s cash balance at December 31<span class=\"_ _1\"></span>, 2022,<span class=\"_ _1\"></span> of 3<span class=\"_ _4\"></span>.6<span class=\"_ _1a9\"> </span> beginning on or after J<span class=\"_ _4\"></span>anuar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2023)<span class=\"_ _1a9\"> </span>million euro is not sufficient to fund the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s operations<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _62\"> </span><span class=\"wsfd\">Amendments to IAS 12 Income T<span class=\"_ _1\"></span>axes: Deferred T<span class=\"_ _25\"></span>ax<span class=\"_ _1a9\"> </span></span><span class=\"wsfd\"> </span>during the next twelve months<span class=\"_ _4\"></span>. How<span class=\"_ _4\"></span>ever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> post-closing,<span class=\"_ _1\"></span> the<span class=\"_ _1a9\"> </span> related to Assets and Liabilities arising from a Single<span class=\"_ _1a9\"> </span> Group entered into the A<span class=\"_ _4\"></span>tlas Subscription Agreement.<span class=\"ws0\"> </span>T<span class=\"_ _25\"></span>ransaction (applicable for annual periods beginning<span class=\"_ _1a9\"> </span> This committed but conditional funding w<span class=\"_ _4\"></span>ould be <span class=\"_ _106\"></span><span class=\"ws0\"> </span>on or after Jan<span class=\"_ _4\"></span>uar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2023)<span class=\"_ _1a9\"> </span>sufficient to fund operations during the next tw<span class=\"_ _4\"></span>elve months<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _62\"> </span><span class=\"ws91\">Amendments to IFRS 16 Leases: Lease Liability in a<span class=\"_ _1a9\"> </span></span><span class=\"ws91\"> </span>from the financial statement\u2019<span class=\"_ _1\"></span>s issue date. Ho<span class=\"_ _4\"></span>wever<span class=\"_ _1\"></span>,<span class=\"_ _1\"></span> given<span class=\"_ _1a9\"> </span> Sale and Leaseback (applicab<span class=\"_ _4\"></span>le for annual periods<span class=\"_ _1a9\"> </span> the contingent nature of this funding,<span class=\"_ _4\"></span> the Group is actively<span class=\"_ _1a9\"> </span> beginning on or after J<span class=\"_ _4\"></span>anuar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 202<span class=\"_ _1\"></span>4,<span class=\"_ _1\"></span> but not yet<span class=\"_ _1a9\"> </span> exploring the possibility of obtaining additional funding<span class=\"_ _1a9\"> </span> endorsed in the EU)<span class=\"_ _1a9\"> </span>through debt,<span class=\"_ _4\"></span> equity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> or non-dilutive funding,<span class=\"_ _1\"></span> including the<span class=\"_ _1a9\"> </span> licensing of THR-149<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> or alternatively r<span class=\"_ _4\"></span>educing its costs<span class=\"_ _1a9\"> </span> None of the new Standards,<span class=\"_ _1\"></span> Interpretations and<span class=\"_ _1a9\"> </span> and investments so that there should be sufficient cash<span class=\"_ _1a9\"> </span> Amendments,<span class=\"_ _1\"></span> which are effective for periods beginning<span class=\"_ _1a9\"> </span> to continue its operations during the next tw<span class=\"_ _4\"></span>elve months.<span class=\"_ _1a9\"> </span>after Jan<span class=\"_ _4\"></span>uar<span class=\"_ _3\"></span>y 1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _1\"></span> that have been issued by the IASB<span class=\"_ _1a9\"> </span> and the IFRS IC but are not y<span class=\"_ _4\"></span>et effective as per Decembe<span class=\"_ _1a9\"> </span>r<span class=\"_ _1a9\"> </span> As the net-assets of the Company ar<span class=\"_ _4\"></span>e below 61<span class=\"_ _1\"></span>,500<span class=\"_ _1a9\"> </span> 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> and/or not y<span class=\"_ _4\"></span>et adopted by the EU as per<span class=\"_ _1a9\"> </span> euro (the statutor<span class=\"_ _3\"></span>y minimum amount of share capital of<span class=\"_ _1a9\"> </span> December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> ar<span class=\"_ _4\"></span>e expected to have a material effect<span class=\"_ _1a9\"> </span> a Belgian public limited liability compan<span class=\"_ _4\"></span>y)<span class=\"_ _1\"></span>, in accordance<span class=\"_ _1a9\"> </span> on the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s current or future financial statements or on<span class=\"_ _1a9\"> </span> with article 7:229 of the BCCA,<span class=\"_ _4\"></span> each inter<span class=\"_ _4\"></span>ested party is<span class=\"_ _1a9\"> </span> foreseeab<span class=\"_ _4\"></span>le future transactions<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>entitled to request the competent commercial court to<span class=\"_ _1a9\"> </span> dissolve the Company<span class=\"_ _25\"></span>. In such instance the court may<span class=\"_ _1a9\"> </span> order the dissolution of the Compan<span class=\"_ _4\"></span>y or grant a grace<span class=\"_ _1a9\"> </span> period within which the Compan<span class=\"_ _4\"></span>y is allow<span class=\"_ _4\"></span>ed to remedy<span class=\"_ _1a9\"> </span> the situation<span class=\"_ _1a9\"> </span>Based on the above<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the Board of Directors considers it may be reasonable to expect that ther<span class=\"_ _4\"></span>e will be sufficient cash to continue its operations during the next tw<span class=\"_ _4\"></span>elve months,<span class=\"_ _1\"></span> and therefore decided to continue its valuation rules under the assumption of going concern. Ho<span class=\"_ _4\"></span>wever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> there is a material uncertainty relating to going concern of the Group because it is uncertain that the above-men<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tioned committed but conditional funding will be availab<span class=\"_ _4\"></span>le when needed given the conditions related to the funding,<span class=\"_ _4\"></span> and because it is not certain whether the Group will be able to timely obtain the necessary additional funding through debt,<span class=\"_ _4\"></span> equity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> or non-dilutive funding,<span class=\"_ _1\"></span> par<span class=\"_ _3\"></span>tnering or to realize sufficient cost and investment r<span class=\"_ _4\"></span>eductions<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>(<span class=\"_ _1a9\"> </span>C) <span class=\"_ _35\"> </span>BASIS OF CONSOLIDA<span class=\"_ _25\"></span>TION<span class=\"_ _1a9\"> </span>Subsidiaries<span class=\"_ _1a9\"> </span>The consolidated financial statements inc<span class=\"_ _4\"></span>lude all the entities that are controlled b<span class=\"_ _4\"></span>y the Group<span class=\"_ _1\"></span>. Control exists when Oxurion directly or indir<span class=\"_ _4\"></span>ectly has the ability to direct the relevant activities that significantly affect the entities<span class=\"_ _1\"></span>\u2019 returns,<span class=\"_ _1\"></span> has exposure or rights to variable returns and the ability to use its pow<span class=\"_ _4\"></span>er over the entity to affect in<span class=\"_ _4\"></span>vestors<span class=\"_ _4\"></span>\u2019 returns,<span class=\"_ _1\"></span> Control is presumed to exist when Oxurion o<span class=\"_ _4\"></span>wns,<span class=\"_ _1\"></span> directly or indir<span class=\"_ _4\"></span>ectly<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> more than 50 percent of the voting rights linked to the share capital. The existence and eff<span class=\"_ _4\"></span>ect of potential voting rights that are curr<span class=\"_ _4\"></span>ently exercisable or convertible are considered when assessing whether the Group controls another entity<span class=\"_ _25\"></span>. Applying this standar<span class=\"_ _4\"></span>d<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s subsidiaries ThromboGenics and Oncurious have been consolidated<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Subsidiaries are fully consolidated fr<span class=\"_ _4\"></span>om the date on which control is transf<span class=\"_ _4\"></span>erred to the Group<span class=\"_ _1\"></span>. They are deconsolidat<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ed from the date on which contro<span class=\"_ _4\"></span>l ceases. A c<span class=\"_ _4\"></span>hange in the ownership inter<span class=\"_ _4\"></span>est of a subsidiar<span class=\"_ _3\"></span>y<span class=\"_ _25\"></span>, without a c<span class=\"_ _4\"></span>hange in control,<span class=\"_ _4\"></span> is accounted for as an equity tr<span class=\"_ _4\"></span>ansaction. Cash flows fr<span class=\"_ _4\"></span>om transactions relating to c<span class=\"_ _4\"></span>hanges in ownership that do not result in a change of contr<span class=\"_ _4\"></span>ol are classifi<span class=\"_ _4\"></span>ed as financing activities.<span class=\"_ _1a9\"> </span>Intra-group tr<span class=\"_ _4\"></span>ansactions,<span class=\"_ _1\"></span> balances and unrealized profits and losses on transactions betw<span class=\"_ _4\"></span>een companies in the Group are eliminated in pr<span class=\"_ _4\"></span>eparing the consolidated financial statements. Unr<span class=\"_ _4\"></span>ealized losses are eliminated in the same way as unr<span class=\"_ _4\"></span>ealized profits unless the transaction indicates an impairment loss on the assets transferr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>. The accounting principles of the subsidiaries ha<span class=\"_ _4\"></span>ve been adjusted where necessar<span class=\"_ _3\"></span>y to be consistent with the princi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ples adopted b<span class=\"_ _4\"></span>y the Group<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>(<span class=\"_ _1a9\"> </span>D) <span class=\"_ _41\"> </span>BUSINESS COMBINA<span class=\"_ _25\"></span>TIONS AND GOODWILL<span class=\"_ _1a9\"> </span>Business combinations are accounted for b<span class=\"_ _4\"></span>y applying the acquisition method<span class=\"_ _4\"></span>. The cost of an acquisition is measured as the aggregate of the consideration trans<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ferred as measur<span class=\"_ _4\"></span>ed at fair value on the acquisition date and the amount of any non-contro<span class=\"_ _4\"></span>lling interests in the acquiree<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or each business combination,<span class=\"_ _1\"></span> the Company elects whether to measure the non-controlling inter<span class=\"_ _4\"></span>ests in the acquiree at fair value or at the proportionate share of the acquiree\u2019<span class=\"_ _1\"></span>s identifiable net assets<span class=\"_ _4\"></span>. Acquisition-r<span class=\"_ _4\"></span>elated costs are expensed as incurr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>. The cost is attrib<span class=\"_ _4\"></span>uted to the identifiable assets<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> liabilities and contingent liabilities of the acquiree<span class=\"_ _4\"></span>. These acquired identifi<span class=\"_ _4\"></span>able assets and (con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tingent) liabilities are initially measur<span class=\"_ _4\"></span>ed at their fair value on the date of acquisition.<span class=\"_ _1a9\"> </span>Goodwill is initially measured at cost (being the excess of the aggregate of the consideration transferr<span class=\"_ _4\"></span>ed and the amount recognized for non-contro<span class=\"_ _4\"></span>lling interests) and any previous interest held o<span class=\"_ _4\"></span>ver the identifiab<span class=\"_ _4\"></span>le assets acquired and liabilities assumed<span class=\"_ _4\"></span>. If the fair value of the net assets acquired is in excess of the aggregate consideration trans<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ferred<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the Company r<span class=\"_ _4\"></span>e-assesses whether it has correctly identified all of the assets acquired and all of the liabilities assumed and reviews the procedur<span class=\"_ _4\"></span>es used to measure the amounts to be recognized at the acquisition date<span class=\"_ _4\"></span>. If the reassessment still results in an excess of the f<span class=\"_ _4\"></span>air value of net assets acquired o<span class=\"_ _4\"></span>ver the aggregate consideration transferr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> then the gain is recognized in the profit or loss<span class=\"_ _1a9\"> </span>. <div class=\"t m0 h17 ff2 fs9 fc7 sc0 ls0 ws0 gs53\">(E) <span class=\"_ _74\"> </span>FOREIGN CURRENCY TRANSLA<span class=\"_ _25\"></span>TION<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h17 ff2 fs9 fc7 sc0 ls0 ws0 gs54\">(F) <span class=\"_ _74\"> </span>REVENUE RECOGNITION<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs55\">F<span class=\"_ _1\"></span>unctional and presentation currency<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws15 gs18\">Revenue recognition for Oxurion consists of JETREA\u00ae via<span class=\"_ _1a9\"> </span>l<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws99 gs19\">sales to distributors<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> ro<span class=\"_ _4\"></span>yalties for JETREA\u00ae vial sales fro<span class=\"_ _1a9\"> </span>m<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws4e gs56\">The consolidated financial statements ar<span class=\"_ _4\"></span>e presented in<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws160 gs1a\">licensees,<span class=\"_ _1\"></span> occasional upfront and milestone payments<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf2 gs57\">thousands of euro<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> which is the functional currency of<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsd3 gs1b\">agreed through license or collabor<span class=\"_ _4\"></span>ation contracts whic<span class=\"_ _1a9\"> </span>h<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1d5 gs58\">Oxurion. All companies within the Group use the euro<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws31 gs59\">could include rec<span class=\"_ _4\"></span>harging of incurr<span class=\"_ _4\"></span>ed ser<span class=\"_ _3\"></span>vices of cost,<span class=\"_ _4\"></span> an<span class=\"_ _1a9\"> </span>d<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws87 gs5a\">as their functional currency<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> except for the US subsidiary<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs1c\">royalties<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs5b\">whose functional currency is the US dollar (USD)<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 h2c ffa fs9 fc7 sc0 ls0 ws0 gs1e\">JETREA\u00ae sales<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs5c\">T<span class=\"_ _1\"></span>ransactions and balances in for<span class=\"_ _4\"></span>eign currencies<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs5d\">Performance obligations<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws23a gs5e\">T<span class=\"_ _25\"></span>ransactions in currencies other than the functional<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws33 gs5f\">currency of the entities ar<span class=\"_ _4\"></span>e recorded at the exc<span class=\"_ _4\"></span>hange rates<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws3b gs60\">Oxurion has identified one performance obligation withi<span class=\"_ _1a9\"> </span>n<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs61\">prevailing on the date of the transaction. On eac<span class=\"_ _4\"></span>h balance<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws11f gs62\">its customer contracts for the sale of JETREA\u00ae product,<span class=\"_ _1\"></span> i.e<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsea gs63\">sheet date,<span class=\"_ _1\"></span> monetar<span class=\"_ _3\"></span>y assets and liabilities denominated<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs64\">the deliver<span class=\"_ _3\"></span>y of goods to its customers.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws219 gs65\">in foreign curr<span class=\"_ _4\"></span>encies are translated into the functional<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf9 gs66\">currency at the exc<span class=\"_ _4\"></span>hange rates prevailing on the balance<span class=\"_ _1a9\"> </span> </div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs67\">Timing of reven<span class=\"_ _4\"></span>ue recognition<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs68\">sheet date.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws9c gs69\">Oxurion recognizes reven<span class=\"_ _4\"></span>ue upon deliver<span class=\"_ _3\"></span>y of the goods to<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws116 gs6a\">Non-monetar<span class=\"_ _3\"></span>y assets and liabilities that are measured<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws192 gs6b\">the customers as that is the moment the customer obtains<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws38 gs6c\">at historical cost in a foreign curr<span class=\"_ _4\"></span>ency by the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs6d\">control o<span class=\"_ _4\"></span>ver the goods.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws200 gs6e\">entities are translated using the exc<span class=\"_ _4\"></span>hange rates at the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs6f\">dates of the initial transactions<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs70\">T<span class=\"_ _1\"></span>ransaction price \u2013 variab<span class=\"_ _4\"></span>le consideration<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws50 gs71\">Gains and losses arising on retranslation using a f<span class=\"_ _4\"></span>oreign<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws23c gs72\">The variable consider<span class=\"_ _4\"></span>ation is estimated at contrac<span class=\"_ _1a9\"> </span>t<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws15c gs73\">currency ar<span class=\"_ _4\"></span>e included in the net profit or loss for the period<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws76 gs2e\">inception and constrained until it is highly probab<span class=\"_ _4\"></span>le that a<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws3f gs74\">significant revenue r<span class=\"_ _4\"></span>eversal in the amount of cumulativ<span class=\"_ _1a9\"> </span>e<span class=\"_ _1a9\"> </span> </div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs75\">F<span class=\"_ _1\"></span>oreign operations<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws24 gs76\">revenue r<span class=\"_ _4\"></span>ecognized will not occur when the associated<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws76 gs77\">uncertainty with the variable consideration is subsequent<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws23b gsf\">On consolidation,<span class=\"_ _4\"></span> the assets and liabilities inc<span class=\"_ _4\"></span>luding<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws8d gs31\">ly resolved<span class=\"_ _1\"></span>. The sales prices are fixed in the contract<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa7 gs78\">goodwill and fair value adjustments arising on consoli<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa8 gs32\">How<span class=\"_ _4\"></span>ever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> some contracts pro<span class=\"_ _4\"></span>vide customers with a righ<span class=\"_ _1a9\"> </span>t<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws78 gs79\">dation of the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s foreign operations are tr<span class=\"_ _4\"></span>anslated at<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs33\">of return and rebates<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws38 gs7a\">the exchange rates pr<span class=\"_ _4\"></span>evailing on the balance sheet date.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws78 gs12\">Income and expense items are translated at the a<span class=\"_ _4\"></span>verage<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws75 gs7b\">Oxurion accepts returns in certain limited cases,<span class=\"_ _4\"></span> and the<span class=\"_ _1a9\"> </span>y<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws39 gs13\">exchange rates f<span class=\"_ _4\"></span>or the period<span class=\"_ _4\"></span>. Exchange r<span class=\"_ _4\"></span>ate differences<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws10b gs7c\">need to be approved b<span class=\"_ _4\"></span>y Oxurion in order to be processe<span class=\"_ _1a9\"> </span>d<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws14b gs7d\">arising,<span class=\"_ _4\"></span> if any<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> ar<span class=\"_ _4\"></span>e classified as equity and tr<span class=\"_ _4\"></span>ansferred to the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws53 gs7e\">by the distrib<span class=\"_ _4\"></span>utors. T<span class=\"_ _4\"></span>he amount of revenue r<span class=\"_ _4\"></span>ecognized is<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws8f gs14\">Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s translation reser<span class=\"_ _3\"></span>ve. Such tr<span class=\"_ _4\"></span>anslation differences<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws5f gs7f\">the amount allocated to the satisfied performance ob<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws69 gs80\">are recognized as income or expense items in the period<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws83 gs81\">ligation taking into account variable consideration (inc<span class=\"_ _4\"></span>l.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs82\">in which the operation is disposed of<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws4a gs83\">expected returns)<span class=\"_ _1\"></span>. The estimated amount of variable con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws6a gs84\">sideration is included in the tr<span class=\"_ _4\"></span>ansaction price only to th<span class=\"_ _1a9\"> </span>e<span class=\"_ _1a9\"> </span> </div>extent that it is highly probable that a significant r<span class=\"_ _4\"></span>eversal in the amount of cumulative revenue r<span class=\"_ _4\"></span>ecognized will not occur and is estimated on the basis of historical experi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ence and the specific terms in the individual agreements<span class=\"_ _4\"></span>. A liability is recognized for expected sales r<span class=\"_ _4\"></span>eturns,<span class=\"_ _1\"></span> rebates,<span class=\"_ _4\"></span> trade and cash discounts,<span class=\"_ _1\"></span> chargebacks or other r<span class=\"_ _4\"></span>eimburse<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments payable directl<span class=\"_ _4\"></span>y or indirectly to customers in r<span class=\"_ _4\"></span>elation to sales made until the end of the reporting period<span class=\"_ _4\"></span>. Oxurion applies the \u2018expected value method<span class=\"_ _1\"></span>\u2019 in order to estimate such return accr<span class=\"_ _4\"></span>uals,<span class=\"_ _1\"></span> and related asset. Oxurion does not offer war<span class=\"_ _4\"></span>ranties,<span class=\"_ _1\"></span> customer loyalty point programs or an<span class=\"_ _4\"></span>y material financing component to its customers<span class=\"_ _4\"></span>. Oxurion has not received any non-cash consid<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>eration. Ther<span class=\"_ _4\"></span>e are no costs to acquire customer contr<span class=\"_ _4\"></span>acts,<span class=\"_ _1\"></span> or costs to fulfil the customer contracts<span class=\"_ _4\"></span>. Ther<span class=\"_ _4\"></span>efore<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> contract balances are only r<span class=\"_ _4\"></span>ecognized to the extent of accounts re-<span class=\"_ _1a9\"> </span>ceivable<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and r<span class=\"_ _4\"></span>efund liability (return accrual)<span class=\"_ _1\"></span>. Royalty r<span class=\"_ _4\"></span>evenue on JETREA\u00ae sales<span class=\"_ _1a9\"> </span>In the case of one distributor<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> ro<span class=\"_ _4\"></span>yalties are gener<span class=\"_ _4\"></span>ated under license agreements based on licensee\u2019<span class=\"_ _1\"></span>s sales of JETREA\u00ae products to the end-customers<span class=\"_ _4\"></span>. As explained above<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> revenue from the sale of goods is recognized at the moment of deliver<span class=\"_ _3\"></span>y to the distributor<span class=\"_ _1\"></span>. However<span class=\"_ _25\"></span>, the agreement stipulates that the ro<span class=\"_ _4\"></span>yalty is earned once the distributor subsequently sells the product to the end-cus<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tomer<span class=\"_ _1\"></span>. Therefor<span class=\"_ _4\"></span>e,<span class=\"_ _1\"></span> the royalty revenue <span class=\"_ _4\"></span>is recognized once the product is sold to the end-customer<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> based on quarterly invoicing data. Ther<span class=\"_ _4\"></span>e is no specific performance obligation for Oxurion to satisfy in order to be entitled to this ro<span class=\"_ _4\"></span>yalty<span class=\"_ _25\"></span>. Occasional upfront,<span class=\"_ _4\"></span> milestone and other payments<span class=\"_ _1a9\"> </span>Revenue is only recognized at an amount that r<span class=\"_ _4\"></span>eflects the consideration to which the Gr<span class=\"_ _4\"></span>oup expects to be entitled in exchange for the satisfied performance obligation. A performance obligation is satisfied when the control of goods or ser<span class=\"_ _3\"></span>vices is transferr<span class=\"_ _4\"></span>ed to a customer<span class=\"_ _1\"></span>. Any upfront payments or license fees for which ther<span class=\"_ _4\"></span>e are subsequent performance obligations,<span class=\"_ _4\"></span> ar<span class=\"_ _4\"></span>e initially reported as deferred revenue and ar<span class=\"_ _4\"></span>e recognized as revenue when perfor<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mance obligations are satisfi<span class=\"_ _4\"></span>ed over the period of the de<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>velopment,<span class=\"_ _4\"></span> collabor<span class=\"_ _4\"></span>ation,<span class=\"_ _4\"></span> or manufacturing ob<span class=\"_ _4\"></span>ligation. W<span class=\"_ _4\"></span>e refer to note 5<span class=\"_ _1\"></span>.8 under key arrangements section<span class=\"_ _1a9\"> </span>..<span class=\"_ _1a9\"> </span>(<span class=\"_ _1a9\"> </span>G) <span class=\"_ _35\"> </span>RESEARCH GRANTS<span class=\"_ _1a9\"> </span>On certain specific research projects,<span class=\"_ _1\"></span> the research costs incurred ar<span class=\"_ _4\"></span>e partially reimbursed by Flander<span class=\"_ _4\"></span>s Innovation &amp; Entrepreneur<span class=\"_ _4\"></span>ship (Vlaams Instituut Innover<span class=\"_ _4\"></span>en en Ondernemen) (<span class=\"ff3 ws0\">\u201cVLAIO\u201d</span>)<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> formerly known as IWT (Agency for Innovation b<span class=\"_ _4\"></span>y Science and T<span class=\"_ _25\"></span>echnolog<span class=\"_ _3\"></span>y in Flanders \u2013 Agentschap voor Inno<span class=\"_ _4\"></span>vatie door W<span class=\"_ _4\"></span>etenschap en T<span class=\"_ _25\"></span>echnologie in Vlaanderen)<span class=\"_ _1\"></span>. In line with IAS 20 \u201cGovernment gr<span class=\"_ _4\"></span>ants<span class=\"_ _4\"></span>\u201d,<span class=\"_ _4\"></span> these gr<span class=\"_ _4\"></span>ants are recognized as government gr<span class=\"_ _4\"></span>ant income over the term of the pr<span class=\"_ _4\"></span>oject for which the gr<span class=\"_ _4\"></span>ant was given when ther<span class=\"_ _4\"></span>e is reasonable assurance that the Group will comp<span class=\"_ _4\"></span>ly with the conditions attached to them and the grants will be r<span class=\"_ _4\"></span>eceived<span class=\"_ _4\"></span>. Gr<span class=\"_ _4\"></span>ants that compensate the Company for expenses incur<span class=\"_ _4\"></span>red are deducted from the \u2018Research and Development Expenses<span class=\"_ _1\"></span>\u2019 on a systematic basis in the same period in which the expenses are incurr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Oxurion has a track r<span class=\"_ _4\"></span>ecord of more than 10 y<span class=\"_ _4\"></span>ears with these types of projects for which it r<span class=\"_ _4\"></span>eceives grants from VLAIO<span class=\"_ _25\"></span>. Grants are pr<span class=\"_ _4\"></span>ovided to Oxurion in order to support certain R&amp;D activities. A<span class=\"_ _4\"></span>ctivities,<span class=\"_ _1\"></span> related budget,<span class=\"_ _4\"></span> and types of costs that will be paid are defined in the grant agr<span class=\"_ _4\"></span>eement. Over the course of the project,<span class=\"_ _1\"></span> Oxurion repor<span class=\"_ _3\"></span>ts on the status of activities and incurred expenditur<span class=\"_ _4\"></span>e to VLAIO on a regular (quarterly) basis in order to receive grant advances<span class=\"_ _4\"></span>. The final assessment is performed by VLAIO at the end of the project in order to determine the final grant amount. Projects can take on aver<span class=\"_ _4\"></span>age between tw<span class=\"_ _4\"></span>o to five years<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Over the course of funded projects,<span class=\"_ _1\"></span> Oxurion is confident that all activities performed will not deviate from the agreed scope,<span class=\"_ _1\"></span> and that the final grant amount will not deviate from the initially agreed amount (except in a limited number o<span class=\"_ _1a9\"> </span>f <div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsd4 gs86\">cases when Oxurion had finalized the project earlier and did<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws134 gs87\">Where the criteria for capitalization of the development<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa6 gs88\">not spend the whole budget b<span class=\"_ _4\"></span>ut has still received the grant<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws2e gs18\">expenses are not met,<span class=\"_ _1\"></span> these expenses are recorded as<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsdc gs89\">based on actual expenditure)<span class=\"_ _1\"></span>. Overall, Oxurion is confident<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs19\">incurred during the period<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws3a gs56\">that the reasonable assur<span class=\"_ _4\"></span>ance as defined in the standard<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsae gs57\">is reached o<span class=\"_ _4\"></span>ver the course of the project for the amounts<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf5 gs1b\">After their initial recording on the statement of financial<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf3 gs58\">spent up to that moment,<span class=\"_ _4\"></span> as the only condition attac<span class=\"_ _4\"></span>hed<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsac gs59\">position intangible assets ar<span class=\"_ _4\"></span>e valued at cost less accumu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws8c gs5a\">to the grant is to perform R&amp;D activities in line with the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1d5 gs1c\">lated depreciation and accumulated impairment losses<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws15 gs5b\">agreed-upon scope and in line with the set budget. T<span class=\"_ _4\"></span>here<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws142 gs1d\">Amortization of capitalized development costs are recog<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws7f gs8a\">are no other conditions attached to the gr<span class=\"_ _4\"></span>ants and the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws100 gs1e\">nized in the statement of profit and loss under \u2018Research<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsda gs8b\">outcome of R&amp;D activities does not impact the decision<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1a6 gs1f\">and Development Expenses<span class=\"_ _4\"></span>\u2019. W<span class=\"_ _4\"></span>e r<span class=\"_ _4\"></span>efer to note 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.3 on<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs8c\">of VLAIO whether the final grant will be received or not.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs8d\">\u2018Research and Development Expenses<span class=\"_ _1\"></span>\u2019.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h17 ff2 fs9 fc7 sc0 ls0 ws0 gs5f\">(H) <span class=\"_ _35\"> </span>INT<span class=\"_ _25\"></span>ANGIBLE ASSETS<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws14 gs60\">The capitalized costs of the patent are amortized over the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws55 gs8e\">life of the patent as of the moment that it would gener<span class=\"_ _4\"></span>ate<span class=\"_ _1a9\"> </span> </div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs8f\">Internally generated intangib<span class=\"_ _4\"></span>le assets<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs64\">revenue<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb9 gs66\">Research costs ar<span class=\"_ _4\"></span>e charged to statement of profit and loss<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs90\">Softwar<span class=\"_ _4\"></span>e licenses are amortized over three y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs68\">as incurred<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs91\">Externally acquired intangib<span class=\"_ _4\"></span>le assets and outsourced<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws18a gs6a\">An internally generated intangib<span class=\"_ _4\"></span>le fixed asset (see note<span class=\"_ _1a9\"> </span> </div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs92\">R&amp;D costs<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws159 gs6c\">5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.3) which arises from development activities undertak<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws3f gs6e\">en in the Group is recognized only if all <span class=\"_ _4\"></span>of the following<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws15d gs2a\">Payments made to thir<span class=\"_ _4\"></span>d parties for subcontracted R&amp;D<span class=\"_ _25\"></span>,<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs6f\">conditions are met:<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1cd gs93\">where there is no tr<span class=\"_ _4\"></span>ansfer of intellectual property to<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws40 gs94\">Oxurion,<span class=\"_ _4\"></span> are expensed as internal R&amp;D expenses in the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs71\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws241\">T<span class=\"_ _1\"></span>echnical possibility of making the intangible asset<span class=\"_ _1a9\"> </span></span><span class=\"ws241\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws167 gs72\">period in which they are incur<span class=\"_ _4\"></span>red<span class=\"_ _1\"></span>. Such payments are only<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs95\">ready for use<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws110 gs2e\">capitalized if they meet the criteria for recognition of an<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs96\">\u2022 <span class=\"_ _62\"> </span><span class=\"wscf\">The intention is to complete the intangible asset and<span class=\"_ _1a9\"> </span></span><span class=\"wscf\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs74\">internally generated intangib<span class=\"_ _4\"></span>le asset,<span class=\"_ _4\"></span> as indicated abo<span class=\"_ _4\"></span>ve.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs97\">use or sell it.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs98\">\u2022 <span class=\"_ _62\"> </span>Possibility of using or selling the intangible asset.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws170 gs77\">Oxurion has entered into various contracts f<span class=\"_ _4\"></span>or the ac<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsf\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws24\">It is probable that the intangible asset will generate<span class=\"_ _1a9\"> </span></span><span class=\"ws24\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws30 gs31\">quisition of licenses to intellectual property or third-par<span class=\"_ _3\"></span>ty<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsbb gs99\">future economic benefit or demonstrate the existence<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wscd gs32\">know-ho<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> as disc<span class=\"_ _4\"></span>losed further in note 5<span class=\"_ _4\"></span>.8 under the key<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs9a\">of a market.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws2c gs33\">arrangements section. T<span class=\"_ _4\"></span>hese assets are typically acquired<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs7a\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws242\">Availability of adequate tec<span class=\"_ _4\"></span>hnical and financial<span class=\"_ _1a9\"> </span></span><span class=\"ws242\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws6e gs9b\">for consideration inc<span class=\"_ _4\"></span>luding upfront,<span class=\"_ _4\"></span> milestone and ro<span class=\"_ _4\"></span>yalty<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs9c\">resources to comp<span class=\"_ _4\"></span>lete the development; and<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs7b\">payments.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs13\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws199\">Availability to r<span class=\"_ _4\"></span>eliably measur<span class=\"_ _4\"></span>e the attributed expenses<span class=\"_ _1a9\"> </span></span><span class=\"ws199\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs9d\">for the intangible asset during development.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsc7 gs7e\">Upfront payments made to third parties to in-license or<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws73 gs7f\">acquire intellectual property rights,<span class=\"_ _4\"></span> patents<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> compounds,<span class=\"_ _1\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws19e gs15\">The patent costs for protecting the intang<span class=\"_ _4\"></span>ible assets are<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws89 gs9e\">products,<span class=\"_ _1\"></span> and know-how tec<span class=\"_ _4\"></span>hnologies to be used in R&amp;D<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs82\">recognized as an expense<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws16d gs83\">activities,<span class=\"_ _1\"></span> are capitalized as costs paid for a separately<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs84\">acquired intangib<span class=\"_ _4\"></span>le asset under IAS 38<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span> </div>The related milestone payments can onl<span class=\"_ _4\"></span>y be capi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>talized if they meet the criteria for recognition of an <span class=\"_ _33\"></span><span class=\"ws0\"> </span>internally generated intangib<span class=\"_ _4\"></span>le asset and is recognized at<span class=\"_ _1a9\"> </span> the moment the milestone is achieved<span class=\"_ _1a9\"> </span> Royalties paid/payab<span class=\"_ _4\"></span>le for acquired intellectual property<span class=\"_ _1a9\"> </span> are accrued for in line with the <span class=\"_ _4\"></span>underlying sales and recog<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>nized under the cost of sales<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span> (I) <span class=\"_ _38\"> </span>PROPERTY<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> PLANT AND EQUIPMENT<span class=\"_ _1a9\"> </span>Property<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> p<span class=\"_ _4\"></span>lant,<span class=\"_ _4\"></span> and equipment are inc<span class=\"_ _4\"></span>luded at the histor<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ical cost (material costs only) less accumulated depreci<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ation and impairment. Subsequent costs are included in<span class=\"_ _1a9\"> </span> the carr<span class=\"_ _3\"></span>ying amount for the asset or booked as a separate<span class=\"_ _1a9\"> </span> asset as appropriate<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> but onl<span class=\"_ _4\"></span>y when it is probable that<span class=\"_ _1a9\"> </span> future economic benefits associated with the item will be<span class=\"_ _1a9\"> </span> generated for the Group and the cost price of the item can<span class=\"_ _1a9\"> </span> be measured reliab<span class=\"_ _4\"></span>ly<span class=\"_ _25\"></span>. All other repair and maintenance<span class=\"_ _1a9\"> </span> costs are char<span class=\"_ _4\"></span>ged to the statement of profit and loss as<span class=\"_ _1a9\"> </span> incurred<span class=\"_ _1\"></span>. The cost of assets retired or otherwise disposed<span class=\"_ _1a9\"> </span> of<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> and the related accumulated depr<span class=\"_ _4\"></span>eciation,<span class=\"_ _4\"></span> are inc<span class=\"_ _4\"></span>luded<span class=\"_ _1a9\"> </span> in the statement of profit and loss as part of the gain or<span class=\"_ _1a9\"> </span> loss on disposal in the year of disposal. Gains and losses<span class=\"_ _1a9\"> </span> on disposal of property<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> p<span class=\"_ _4\"></span>lant and equipment are included<span class=\"_ _1a9\"> </span> in other income or expense.<span class=\"_ _1a9\"> </span>Depreciation is calculated using the straight-line method to<span class=\"_ _1a9\"> </span> allocate the cost of property<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> p<span class=\"_ _4\"></span>lant and equipment to their<span class=\"_ _1a9\"> </span> estimated residual values o<span class=\"_ _4\"></span>ver their estimated useful lives<span class=\"_ _1a9\"> </span> as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Proper<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>, p<span class=\"_ _4\"></span>lant and equipment: three to five y<span class=\"_ _4\"></span>ears<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>F<span class=\"_ _4\"></span>urniture and fittings: thr<span class=\"_ _4\"></span>ee to five years<span class=\"_ _1a9\"> </span>The depreciation methods<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> useful life and r<span class=\"_ _4\"></span>esidual value<span class=\"_ _1a9\"> </span> are revalued on eac<span class=\"_ _4\"></span>h reporting date.<span class=\"_ _1a9\"> </span>W<span class=\"_ _4\"></span>e refer to the notes 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.3 until 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.5 for the disclosures<span class=\"_ _1a9\"> </span> of where the depreciation c<span class=\"_ _4\"></span>harges are r<span class=\"_ _4\"></span>ecognized in the<span class=\"_ _1a9\"> </span> statement of profit and loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Subsequent costs<span class=\"_ _1a9\"> </span>The cost of rep<span class=\"_ _4\"></span>lacing part of an item of proper<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>, p<span class=\"_ _4\"></span>lant<span class=\"_ _1a9\"> </span> and equipment is recognized in the carrying amount of<span class=\"_ _1a9\"> </span> the item if it is probable that the futur<span class=\"_ _4\"></span>e economic benefits<span class=\"_ _1a9\"> </span> embodied within the item replaced will fl<span class=\"_ _4\"></span>ow to the Group<span class=\"_ _1a9\"> </span> and its cost can be measured reliab<span class=\"_ _4\"></span>ly<span class=\"_ _25\"></span>. The carr<span class=\"_ _3\"></span>ying amount<span class=\"_ _1a9\"> </span> of the replaced item is der<span class=\"_ _4\"></span>ecognized<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he costs of the day-<span class=\"_ _1a9\"> </span>to-day ser<span class=\"_ _3\"></span>vicing of proper<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> plant and equipment are r<span class=\"_ _4\"></span>ec<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ognized in profit or loss as incurred<span class=\"_ _1a9\"> </span><span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>(J) <span class=\"_ _31\"> </span>LEASED ASSETS<span class=\"_ _1a9\"> </span>IFRS 16<span class=\"_ _1a9\"> </span>The Group leases an office<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> copiers,<span class=\"_ _4\"></span> and cars<span class=\"_ _4\"></span>. Rental<span class=\"_ _1a9\"> </span> contracts are typicall<span class=\"_ _4\"></span>y made for fixed periods of 3 to 4<span class=\"_ _1a9\"> </span> years b<span class=\"_ _4\"></span>ut may have extension options as described belo<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span> Lease terms are negotiated on an individual basis and<span class=\"_ _1a9\"> </span> contain a wide range of differ<span class=\"_ _4\"></span>ent terms and conditions.<span class=\"_ _1a9\"> </span> The lease agreements do not impose an<span class=\"_ _4\"></span>y co<span class=\"_ _4\"></span>venants,<span class=\"_ _1\"></span> but<span class=\"_ _1a9\"> </span> leased assets may not be used as security for borro<span class=\"_ _4\"></span>wing<span class=\"_ _1a9\"> </span> purposes<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Leases are recognized as right-of-use assets and a cor<span class=\"_ _25\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>responding liability at the date at which the leased asset<span class=\"_ _1a9\"> </span> is available f<span class=\"_ _4\"></span>or use by the Group<span class=\"_ _1\"></span>. Each lease payment<span class=\"_ _1a9\"> </span> is allocated between the liability and finance cost. T<span class=\"_ _4\"></span>he<span class=\"_ _1a9\"> </span> finance cost is charged to profit or loss o<span class=\"_ _4\"></span>ver the lease<span class=\"_ _1a9\"> </span> period so as to produce a constant periodic rate of inter<span class=\"_ _4\"></span>est<span class=\"_ _1a9\"> </span> on the remaining balance of the liability for eac<span class=\"_ _4\"></span>h period<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> The right-of-use asset is depreciated o<span class=\"_ _4\"></span>ver the shorter of<span class=\"_ _1a9\"> </span> these asset\u2019<span class=\"_ _1\"></span>s useful life and the lease term on a straight-<span class=\"_ _1a9\"> </span>line basis<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>Assets and liabilities arising from a lease are initially<span class=\"_ _1a9\"> </span> measured on a present value basis<span class=\"_ _4\"></span>. Lease liabilities are<span class=\"_ _1a9\"> </span> exclusively composed of fixed payments less an<span class=\"_ _4\"></span>y lease<span class=\"_ _1a9\"> </span> incentives receivable<span class=\"_ _1a9\"> </span>The lease payments are discounted using the lessee\u2019<span class=\"_ _25\"></span>s in<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>there are separ<span class=\"_ _4\"></span>ately identifiab<span class=\"_ _4\"></span>le cash flows (cash-gener<span class=\"_ _4\"></span>at<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cremental borro<span class=\"_ _4\"></span>wing rate<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> being the rate that the lessee<span class=\"_ _1a9\"> </span> ing units)<span class=\"_ _4\"></span>. The impairment loss is allocated fir<span class=\"_ _4\"></span>st to reduce<span class=\"_ _1a9\"> </span> would ha<span class=\"_ _4\"></span>ve to pay to borrow the funds necessary to obtain<span class=\"_ _1a9\"> </span> the carr<span class=\"_ _3\"></span>ying amount of any goodwill allocated to the<span class=\"_ _1a9\"> </span> an asset of similar value in a similar economic environ<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cash-generating unit pro r<span class=\"_ _4\"></span>ata to the carr<span class=\"_ _3\"></span>ying amount of<span class=\"_ _1a9\"> </span> ment with similar terms and conditions.<span class=\"_ _1a9\"> </span>each asset in the unit. An impairment loss recognized f<span class=\"_ _4\"></span>or<span class=\"_ _1a9\"> </span> goodwill cannot be rever<span class=\"_ _4\"></span>sed in a subsequent period<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or<span class=\"_ _1a9\"> </span> Right-of-use assets are measured at cost comprising the<span class=\"_ _1a9\"> </span> assets other than goodwill,<span class=\"_ _4\"></span> wher<span class=\"_ _4\"></span>e an impairment loss is<span class=\"_ _1a9\"> </span> amount of the initial measurement of the lease liability and<span class=\"_ _1a9\"> </span> subsequently reversed<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the carr<span class=\"_ _3\"></span>ying amount of the asset<span class=\"_ _1a9\"> </span> any lease payments made at or befor<span class=\"_ _4\"></span>e the commence<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>(cash-generating unit) is increased to the r<span class=\"_ _4\"></span>evised estimate<span class=\"_ _1a9\"> </span> ment date.<span class=\"_ _1a9\"> </span>of its reco<span class=\"_ _4\"></span>verable value<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> but in such a way that the incr<span class=\"_ _4\"></span>eased<span class=\"_ _1a9\"> </span> carr<span class=\"_ _3\"></span>ying amount does not exceed the carr<span class=\"_ _3\"></span>ying amount<span class=\"_ _1a9\"> </span> Payments associated with short-term leases and leases of<span class=\"_ _1a9\"> </span> that would ha<span class=\"_ _4\"></span>ve been determined had no impairment loss<span class=\"_ _1a9\"> </span> low-value assets ar<span class=\"_ _4\"></span>e recognized on a straight-line basis as<span class=\"_ _1a9\"> </span> been included for the asset (cash-gener<span class=\"_ _4\"></span>ating unit) in prior<span class=\"_ _1a9\"> </span> an expense in profit or loss<span class=\"_ _4\"></span>. Short-term leases comprise<span class=\"_ _1a9\"> </span> years<span class=\"_ _4\"></span>. The r<span class=\"_ _4\"></span>eversal of an impairment loss is included im<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>some car leases and are leases with a lease term of tw<span class=\"_ _4\"></span>elve<span class=\"_ _1a9\"> </span> mediately in the statement of profit and loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>months or less. Lo<span class=\"_ _4\"></span>w-value assets only comprise of one<span class=\"_ _1a9\"> </span> copier<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>(L) <span class=\"_ _72\"> </span>INCOME T<span class=\"_ _25\"></span>AXES<span class=\"_ _1a9\"> </span>W<span class=\"_ _4\"></span>e refer to note 5<span class=\"_ _1\"></span>.7<span class=\"_ _25\"></span>.2 for more information.<span class=\"_ _1a9\"> </span>Income tax expenses in the statement of profit and loss<span class=\"_ _1a9\"> </span> comprise the tax currently payab<span class=\"_ _4\"></span>le.<span class=\"_ _1a9\"> </span>(K) <span class=\"_ _56\"> </span>IMP<span class=\"_ _1\"></span>AIRMENT L<span class=\"_ _1\"></span>OSSES ON GOODWILL,<span class=\"_ _4\"></span> INT<span class=\"_ _25\"></span>ANGIBLE ASSETS AND PROPERTY<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> The tax curr<span class=\"_ _4\"></span>ently payable is based on taxable pr<span class=\"_ _4\"></span>ofit for<span class=\"_ _1a9\"> </span> PLANT AND EQUIPMENT<span class=\"_ _1a9\"> </span>the year<span class=\"_ _1\"></span>. T<span class=\"_ _25\"></span>axable profit differs from net pr<span class=\"_ _4\"></span>ofit as reported<span class=\"_ _1a9\"> </span> on the statement of profit and loss because it excludes<span class=\"_ _1a9\"> </span> Intangible assets with an indefinite useful life or <span class=\"_ _4\"></span>not yet<span class=\"_ _1a9\"> </span> items of income or expense that are taxable or deductib<span class=\"_ _4\"></span>le<span class=\"_ _1a9\"> </span> available f<span class=\"_ _4\"></span>or use and goodwill are not subject to amortiza<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>in other years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and it further excludes items that are never<span class=\"_ _1a9\"> </span> tion but are tested ann<span class=\"_ _4\"></span>ually for impairment or if there is an<span class=\"_ _1a9\"> </span> taxable or deductible<span class=\"_ _4\"></span>. The Gr<span class=\"_ _4\"></span>oup<span class=\"_ _1\"></span>\u2019<span class=\"_ _4\"></span>s liability for cur<span class=\"_ _4\"></span>rent tax<span class=\"_ _1a9\"> </span> indication that an asset may be impaired<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>is calculated using tax rates that have been enacted or<span class=\"_ _1a9\"> </span> substantially enacted on the reporting date.<span class=\"_ _1a9\"> </span>Assets that are subject to amortization or depreciation are<span class=\"_ _1a9\"> </span> review<span class=\"_ _4\"></span>ed for impairment whenever events or changes in<span class=\"_ _1a9\"> </span> Deferred tax is the tax expected to be payab<span class=\"_ _4\"></span>le or reco<span class=\"_ _4\"></span>v<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>circumstances indicate that the carr<span class=\"_ _3\"></span>ying amount may not<span class=\"_ _1a9\"> </span> erable on diff<span class=\"_ _4\"></span>erences betw<span class=\"_ _4\"></span>een the carr<span class=\"_ _3\"></span>ying amounts of<span class=\"_ _1a9\"> </span> be reco<span class=\"_ _4\"></span>verable<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>assets and liabilities in the financial statements and the<span class=\"_ _1a9\"> </span> corresponding tax bases used in the computation of<span class=\"_ _1a9\"> </span> An impairment loss is recognized for the amount b<span class=\"_ _4\"></span>y which<span class=\"_ _1a9\"> </span> taxable profit and is accounted for using the balance sheet<span class=\"_ _1a9\"> </span> the carr<span class=\"_ _3\"></span>ying amount of the asset exceeds its recover<span class=\"_ _4\"></span>able<span class=\"_ _1a9\"> </span> method<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>amount. The reco<span class=\"_ _4\"></span>verab<span class=\"_ _4\"></span>le amount is the higher of an asset\u2019<span class=\"_ _1\"></span>s<span class=\"_ _1a9\"> </span> fair value less the costs to sell the asset and its value in use<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> Deferred tax liabilities ar<span class=\"_ _4\"></span>e generally r<span class=\"_ _4\"></span>ecognized for all<span class=\"_ _1a9\"> </span> These values are gener<span class=\"_ _4\"></span>ally determined based on discount<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>taxable temporary differences. Def<span class=\"_ _4\"></span>erred tax assets are r<span class=\"_ _4\"></span>ec<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ed cash flow calculations<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or the purpose of assessing im<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ognized to the extent that it is probable that taxab<span class=\"_ _4\"></span>le profits<span class=\"_ _1a9\"> </span> pairment,<span class=\"_ _4\"></span> assets are gr<span class=\"_ _4\"></span>ouped at the low<span class=\"_ _4\"></span>est levels for which<span class=\"_ _1a9\"> </span> will be available against whic<span class=\"_ _4\"></span>h deductible temporary<span class=\"_ _1a9\"> </span>differences can be utilized<span class=\"_ _1\"></span>. Such assets and liabilities are not recognized if the temporary difference arises from goodwill (or negative goodwill) or fr<span class=\"_ _4\"></span>om the initial recogni<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion (other than in a business combination) of other assets and liabilities in a transaction that affects neither the tax profit nor the accounting profit.<span class=\"_ _1a9\"> </span>Deferred tax liabilities ar<span class=\"_ _4\"></span>e recognized for taxab<span class=\"_ _4\"></span>le temporar<span class=\"_ _3\"></span>y differences arising on in<span class=\"_ _4\"></span>vestments in subsidiaries and as<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>sociates,<span class=\"_ _1\"></span> and interests in joint ventures,<span class=\"_ _1\"></span> except where the Group is able to contro<span class=\"_ _4\"></span>l the reversal of the temporary dif<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ference and it is probab<span class=\"_ _4\"></span>le that the temporary difference will not reverse in the for<span class=\"_ _4\"></span>eseeable future<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Deferred tax is calculated at the tax r<span class=\"_ _4\"></span>ates that are expected to apply in the period when the liability is settled<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> or the asset realized<span class=\"_ _1\"></span>. Deferred tax is charged or cr<span class=\"_ _4\"></span>edited in the statement of profit and loss,<span class=\"_ _1\"></span> except when it relates to items charged or cr<span class=\"_ _4\"></span>edited directly to equity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> in whic<span class=\"_ _4\"></span>h case the deferred tax is also dealt with in equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>Deferred tax assets and liabilities ar<span class=\"_ _4\"></span>e offset when they relate to income taxes levied b<span class=\"_ _4\"></span>y the same taxation authority and the Group intends to settle its current tax assets and liabilities on a net basis<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>The Group also r<span class=\"_ _4\"></span>eceives tax credits for R&amp;D expenses<span class=\"_ _4\"></span>. These R&amp;D expenses are r<span class=\"_ _4\"></span>ecorded through P&amp;L under IFRS in the line item \u2018Research and development expenses<span class=\"_ _1\"></span>\u2019 as the expenses do not meet the requirements in IAS 38 to be capitalized<span class=\"_ _4\"></span>. The tax cr<span class=\"_ _4\"></span>edit is not subject to unfulfilled conditions. In case ther<span class=\"_ _4\"></span>e is insufficient tax against which to set off the tax credit,<span class=\"_ _1\"></span> the credit can be carried for<span class=\"_ _3\"></span>ward during 5 consecutive assessment years<span class=\"_ _4\"></span>. The tax cr<span class=\"_ _4\"></span>edit re<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ceivable is presented f<span class=\"_ _4\"></span>or the non-current portion in the line item \u2018Non-current tax cr<span class=\"_ _4\"></span>edit\u2019 and for the current portion in the line item \u2018Current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _4\"></span>\u2019 of the consolidated statement of financial position. At the end of 5 consecu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tive assessment years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the balance of the unused tax cr<span class=\"_ _4\"></span>edit is received in cash from the go<span class=\"_ _4\"></span>vernment. The income from those tax credits is inc<span class=\"_ _4\"></span>luded in the line item \u2018Other operating income\u2019 in the statement of profit and loss<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>(M) <span class=\"_ _7d\"> </span>EMPL<span class=\"_ _4\"></span>O<span class=\"_ _4\"></span>YEE BENEFIT PLAN<span class=\"_ _1a9\"> </span>Short-term employee benefits<span class=\"_ _1a9\"> </span>Liabilities for wages and salaries that ar<span class=\"_ _4\"></span>e expected to be<span class=\"_ _1a9\"> </span> settled wholly within tw<span class=\"_ _4\"></span>elve months after the end of the<span class=\"_ _1a9\"> </span> period in which the emplo<span class=\"_ _4\"></span>y<span class=\"_ _4\"></span>ees render the related service<span class=\"_ _1a9\"> </span> are recognized in r<span class=\"_ _4\"></span>espect of emplo<span class=\"_ _4\"></span>yees<span class=\"_ _1\"></span>\u2019 ser<span class=\"_ _23\"></span>vices up to<span class=\"_ _1a9\"> </span> the end of the reporting period and are measured at<span class=\"_ _1a9\"> </span> the amounts expected to be paid when the liabilities are<span class=\"_ _1a9\"> </span> settled<span class=\"_ _4\"></span>. The liabilities ar<span class=\"_ _4\"></span>e presented as curr<span class=\"_ _4\"></span>ent emplo<span class=\"_ _4\"></span>yee<span class=\"_ _1a9\"> </span> benefit obligations in the statement of financial position.<span class=\"_ _1a9\"> </span>Pension benefits<span class=\"_ _1a9\"> </span>Starting July 1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2009<span class=\"_ _1\"></span>, the Group c<span class=\"_ _4\"></span>hanged the defined<span class=\"_ _1a9\"> </span> benefit pension plan into a new defined contribution<span class=\"_ _1a9\"> </span> pension plan. All acquired rights up to J<span class=\"_ _4\"></span>une 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2009<span class=\"_ _25\"></span>, ar<span class=\"_ _4\"></span>e<span class=\"_ _1a9\"> </span> retained<span class=\"_ _1\"></span>. Therefore<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the Group has two pension plans: (i)<span class=\"_ _1a9\"> </span> the initial defined benefit plan and (ii) the pension plan,<span class=\"_ _1\"></span> which is a defined contribution p<span class=\"_ _4\"></span>lan in structure<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The assets of both plans ar<span class=\"_ _4\"></span>e held in separate trustee-ad<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ministered funds<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>According to the Belgian legislation app<span class=\"_ _4\"></span>licable to the<span class=\"_ _1a9\"> </span> second pillar pension plans (the minimum guar<span class=\"_ _4\"></span>anteed<span class=\"_ _1a9\"> </span> return under the so-called \u201cLaw V<span class=\"_ _1\"></span>andenbroucke\u201d)<span class=\"_ _1\"></span>, all<span class=\"_ _1a9\"> </span> Belgian pension plans that ar<span class=\"_ _4\"></span>e structured as defined con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tribution plans ar<span class=\"_ _4\"></span>e considered defined benefit plans under<span class=\"_ _1a9\"> </span> IFRS and therefor<span class=\"_ _4\"></span>e are accounted for as such.<span class=\"_ _1a9\"> </span>Because of this minimum guaranteed r<span class=\"_ _4\"></span>eturn,<span class=\"_ _4\"></span> the emplo<span class=\"_ _4\"></span>yer<span class=\"_ _1a9\"> </span> is exposed to a financial risk since further contributions<span class=\"_ _1a9\"> </span> could be required if the r<span class=\"_ _4\"></span>eturn on the assets is not suffi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cient to reach the minim<span class=\"_ _4\"></span>um benefits to be paid<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s commitments under defined benefit plans,<span class=\"_ _1\"></span> and the related costs,<span class=\"_ _1\"></span> are measured using the \u201cprojected<span class=\"_ _1a9\"> </span> unit credit method<span class=\"_ _1\"></span>\u201d with actuarial valuations being carried<span class=\"_ _1a9\"> </span> out at each balance sheet date b<span class=\"_ _4\"></span>y a qualified actuar<span class=\"_ _3\"></span>y<span class=\"_ _25\"></span>. Past<span class=\"_ _1a9\"> </span> ser<span class=\"_ _3\"></span>vice cost is included immediately to the extent that the<span class=\"_ _1a9\"> </span> <div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws57 gs100\">benefits are alread<span class=\"_ _4\"></span>y vested<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> and other<span class=\"_ _23\"></span>wise the ser<span class=\"_ _3\"></span>vice is<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws110 gs101\">of the revision of original estimates<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> if an<span class=\"_ _4\"></span>y<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> in the statement<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb4 gs53\">amortized on a straight-line basis over the aver<span class=\"_ _4\"></span>age period<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws14d gs54\">of profit and loss,<span class=\"_ _1\"></span> and a corresponding adjustment to equity<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws199 gs86\">until the benefits become vested<span class=\"_ _4\"></span>. Remeasurements of the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws10c gs87\">over the r<span class=\"_ _4\"></span>emaining vesting period<span class=\"_ _4\"></span>. The pr<span class=\"_ _4\"></span>oceeds received<span class=\"_ _1\"></span>, net<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws18 gs88\">net defined obligation are r<span class=\"_ _4\"></span>ecognized directly within equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws8c gs18\">of any dir<span class=\"_ _4\"></span>ectly attributable tr<span class=\"_ _4\"></span>ansaction costs,<span class=\"_ _1\"></span> are credited to<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wsf9 gs19\">share capital (nominal value) and share pr<span class=\"_ _4\"></span>emium when the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws248 gs56\">The retir<span class=\"_ _4\"></span>ement benefit obligation recognized in the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws0 gs1a\">subscription rights are exercised<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws12d gs57\">statement of financial position represents the f<span class=\"_ _4\"></span>air value of<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws94 gs58\">plan assets at the reporting date,<span class=\"_ _1\"></span> less plan liabilities calcu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m0 h17 ff2 fs9 fc7 sc0 ls15 ws5b gs59\">(N) <span class=\"_ _56\"> </span><span class=\"ws0\">FINANCIAL INS<span class=\"_ _4\"></span>TRUMENTS<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws85 gs5a\">lated using the projected unit credit method discounted<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws30 gs5b\">to its present value using yields availab<span class=\"_ _4\"></span>le on high quality<span class=\"_ _1a9\"> </span> </div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs102\">F<span class=\"_ _4\"></span>inancial assets<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws172 gs8a\">corporate bonds that have maturity dates appr<span class=\"_ _4\"></span>oximating<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf9 gs8b\">to the terms of the liabilities and are denominated in the<span class=\"_ _1a9\"> </span> </div><div class=\"t m0 h2d ff3 fs4 fc6 sc0 ls0 ws0 gs1f\">IN<span class=\"_ _3\"></span>ITIAL R<span class=\"_ _3\"></span>ECOGNI<span class=\"_ _3\"></span>TIO<span class=\"_ _3\"></span>N AND M<span class=\"_ _3\"></span>E<span class=\"_ _3\"></span>ASU<span class=\"_ _3\"></span>REM<span class=\"_ _3\"></span>ENT<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsca gs8c\">same currency as the post-emp<span class=\"_ _4\"></span>loyment benefit obliga<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws9c gs8d\">F<span class=\"_ _4\"></span>inancial assets are classifi<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> at initial recognition,<span class=\"_ _4\"></span> and subse<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsca gs5e\">tions less the effect of minimum funding requir<span class=\"_ _4\"></span>ements<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws120 gs20\">quently measured<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> at either amortized cost, fair value thr<span class=\"_ _4\"></span>ough<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs103\">agreed with scheme tr<span class=\"_ _4\"></span>ustees.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws136 gs104\">other comprehensive income (<span class=\"ff3 ws5b\">\u201cOCI<span class=\"_ _4\"></span>\u201d<span class=\"ff1 ws136\">) or fair value through<span class=\"_ _1a9\"> </span></span></span><span class=\"ff3 ws5b\"><span class=\"ff1 ws136\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws0 gs62\">profit or loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsad gs63\">No other long- or short-term benefits are granted to<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs65\">emplo<span class=\"_ _4\"></span>yees<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws160 gsb1\">The classification of financial assets at initial r<span class=\"_ _4\"></span>ecognition<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws151 gs90\">depends on the financial asset\u2019<span class=\"_ _1\"></span>s contractual cash flow c<span class=\"_ _4\"></span>har<span class=\"_ _1\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs105\">Share-based compensation<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wsbb gs26\">acteristics and the Company\u2019<span class=\"_ _1\"></span>s business model for manag<span class=\"_ _4\"></span>ing<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws132 gs69\">them. With the exception of trade r<span class=\"_ _4\"></span>eceivables that do not<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wsba gs6a\">The Group oper<span class=\"_ _4\"></span>ates equity-settled<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> share-based compensa<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws1cb gs6b\">contain a significant financing component,<span class=\"_ _4\"></span> the Compan<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws7b gs6c\">tion plans through whic<span class=\"_ _4\"></span>h it grants share subscription rights<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws156 gs6d\">initially measures a financial asset at its fair value <span class=\"_ _4\"></span>plus,<span class=\"_ _1\"></span> in the<span class=\"_ _3\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws2c gs6e\">(giving the holder the right to subscribe to a specific number<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws137 gs2a\">case of a financial asset not at fair value through profit or loss<span class=\"_ _4\"></span>,<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wsb3 gs6f\">of shares in accordance with the shar<span class=\"_ _4\"></span>e option plan,<span class=\"_ _1\"></span> hereafter<span class=\"_ _3\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws0 gs93\">transaction costs<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws191 gsa9\">referr<span class=\"_ _4\"></span>ed to as \u2018subscription rights<span class=\"_ _4\"></span>\u2019) to the CEO<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> personnel,<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wsc2 gs71\">and consultants as consideration in exchange f<span class=\"_ _4\"></span>or ser<span class=\"_ _3\"></span>vices<span class=\"_ _3\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws53 gs72\">T<span class=\"_ _25\"></span>rade receivables that do not contain a significant financing<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wsf6 gs73\">performed<span class=\"_ _4\"></span>. The fair value of the services received in exchange<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws9c gs2e\">component are measured initiall<span class=\"_ _4\"></span>y at the transaction price de<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wsea gs96\">for the granting of the subscription rights is r<span class=\"_ _4\"></span>ecognized as<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws0 gs74\">termined under IFRS 15<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wscc gsaa\">an expense over the vesting period with a corr<span class=\"_ _4\"></span>esponding<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws0 gs98\">increase in equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws30 gs77\">In order for a financial asset to be classifi<span class=\"_ _4\"></span>ed and measured<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws151 gs31\">at amortized cost or fair value through OCI<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> it needs to give<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws7f gs78\">The total amount to be expensed o<span class=\"_ _4\"></span>ver the vesting period<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws78 gs32\">rise to cash flows that ar<span class=\"_ _4\"></span>e \u2018solely payments of principal and<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws8c gs79\">is determined by r<span class=\"_ _4\"></span>eference to the fair value at the date on<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws50 gs33\">interest\u2019 (<span class=\"ff3 ws5b\">\u201cSPPI<span class=\"_ _4\"></span>\u201d<span class=\"ff1 ws50\">) on the principal amount outstanding. This<span class=\"_ _1a9\"> </span></span></span><span class=\"ff3 ws5b\"><span class=\"ff1 ws50\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wsb0 gs7a\">which the subscription rights are gr<span class=\"_ _4\"></span>anted<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> measured using<span class=\"_ _3\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws88 gs9b\">assessment is referr<span class=\"_ _4\"></span>ed to as the SPPI test and is performed<span class=\"_ _3\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws98 gs12\">the Black &amp; Scho<span class=\"_ _4\"></span>les model,<span class=\"_ _4\"></span> taking into account the term and<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws0 gs7b\">at an instrument level.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws3f gs13\">conditions upon which the subscription rights w<span class=\"_ _4\"></span>ere granted<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws1b gs7d\">excluding the impact of an<span class=\"_ _4\"></span>y non-market vesting conditions. A<span class=\"_ _4\"></span>t<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws249 gs7e\">The Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s business model for managing financial<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wsde gs106\">each balance sheet date<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the entity r<span class=\"_ _4\"></span>evises its estimates of the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws18f gs107\">assets refers to ho<span class=\"_ _4\"></span>w it manages its financial assets in order<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws18f gs80\">number of subscription rights that are expected to become<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws184 gs81\">to generate cash flo<span class=\"_ _4\"></span>ws<span class=\"_ _4\"></span>. The business model determines<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws142 gs82\">exercisable except wher<span class=\"_ _4\"></span>e forfeiture is only due to shares not<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wsf6 gs83\">whether cash flows will r<span class=\"_ _4\"></span>esult from collecting contractual cash<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws87 gs17\">achieving the thresho<span class=\"_ _4\"></span>ld for vesting. It recognizes the impact<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws0 gs84\">flows<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> selling the financial assets<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> or both<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span> </div>SUBS<span class=\"_ _3\"></span>EQUENT ME<span class=\"_ _3\"></span>ASU<span class=\"_ _3\"></span>REMENT<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>or purposes of subsequent measurement,<span class=\"_ _4\"></span> the fo<span class=\"_ _4\"></span>llowing cat<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>egories of financial assets are r<span class=\"_ _4\"></span>elevant to the Company:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _6c\"> </span><span class=\"ws157\">F<span class=\"_ _4\"></span>inancial assets at amortized costs (trade receivables,<span class=\"_ _4\"></span> </span>term deposits); and<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _6c\"> </span><span class=\"ws165\">F<span class=\"_ _4\"></span>inancial assets at fair value through OCI (in<span class=\"_ _4\"></span>vestments in<span class=\"_ _1a9\"> </span></span><span class=\"ws165\"> </span>debt instruments (bonds))<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>FINA<span class=\"_ _3\"></span>NCIAL A<span class=\"_ _3\"></span>SS<span class=\"_ _3\"></span>ETS A<span class=\"_ _1\"></span>T A<span class=\"_ _3\"></span>MO<span class=\"_ _3\"></span>RTIZED COST<span class=\"_ _1a9\"> </span>This category is the most relevant to the Company<span class=\"_ _25\"></span>. The<span class=\"_ _1a9\"> </span> Company measur<span class=\"_ _4\"></span>es financial assets at amortized cost if both<span class=\"_ _3\"></span> of the follo<span class=\"_ _4\"></span>wing conditions are met:<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _6c\"> </span><span class=\"ws64\">The financial asset is held within a business model with<span class=\"_ _1a9\"> </span></span><span class=\"ws64\"> </span>the objective to hold financial assets in order to collect<span class=\"_ _1a9\"> </span> contractual cash flo<span class=\"_ _4\"></span>ws; and<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _6c\"> </span><span class=\"ws6e\">The contractual terms of the financial asset g<span class=\"_ _4\"></span>ive rise on<span class=\"_ _1a9\"> </span></span><span class=\"ws6e\"> </span>specified dates to cash flo<span class=\"_ _4\"></span>ws that are solely payments of<span class=\"_ _1a9\"> </span> principal and interest on the principal amount outstanding. <span class=\"_ _107\"></span> F<span class=\"_ _4\"></span>inancial assets at amortized cost are subsequently measured<span class=\"_ _1a9\"> </span> using the effective interest r<span class=\"_ _4\"></span>ate (<span class=\"ff3 ws5b\">\u201cEIR\u201d</span>) method and are subject<span class=\"_ _1a9\"> </span> to impairment. Gains and losses are recognized in pr<span class=\"_ _4\"></span>ofit or<span class=\"_ _1a9\"> </span> loss when the asset is derecognized<span class=\"_ _1\"></span>, modifi<span class=\"_ _4\"></span>ed or impaired<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s financial assets at amor<span class=\"_ _3\"></span>tized cost mainly<span class=\"_ _1a9\"> </span> includes trade r<span class=\"_ _4\"></span>eceivables and term deposits<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>FINA<span class=\"_ _3\"></span>NCIAL A<span class=\"_ _3\"></span>SS<span class=\"_ _3\"></span>ETS TH<span class=\"_ _3\"></span>ROU<span class=\"_ _3\"></span>GH OCI (DEBT IN<span class=\"_ _3\"></span>STRU<span class=\"_ _3\"></span>MEN<span class=\"_ _3\"></span>TS<span class=\"_ _4\"></span>)<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y measures debt instruments at fair value<span class=\"_ _1a9\"> </span> through OCI if both of the follo<span class=\"_ _4\"></span>wing conditions are met:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _6c\"> </span><span class=\"ws64\">The financial asset is held within a business model with<span class=\"_ _1a9\"> </span></span><span class=\"ws64\"> </span>the objective of both holding to collect contractual cash<span class=\"_ _1a9\"> </span> flows and selling; and<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _6c\"> </span><span class=\"ws6e\">The contractual terms of the financial asset g<span class=\"_ _4\"></span>ive rise on<span class=\"_ _1a9\"> </span></span><span class=\"ws6e\"> </span>specified dates to cash flo<span class=\"_ _4\"></span>ws that are solely payments of<span class=\"_ _1a9\"> </span> principal and interest on the principal amount outstanding.<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>or debt instruments at fair value through OCI<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> interest<span class=\"_ _1a9\"> </span> income,<span class=\"_ _1\"></span> foreign exchange r<span class=\"_ _4\"></span>evaluation and impairment losses<span class=\"_ _1a9\"> </span> or reversals ar<span class=\"_ _4\"></span>e recognized in the statement of profit or loss<span class=\"_ _1a9\"> </span> and computed in the same manner as for financial assets<span class=\"_ _1a9\"> </span> measured at amortized cost. The remaining fair value c<span class=\"_ _4\"></span>hanges<span class=\"_ _1a9\"> </span> are recognized in OCI<span class=\"_ _1\"></span>. Upon derecognition,<span class=\"_ _4\"></span> the cumulative f<span class=\"_ _4\"></span>air<span class=\"_ _1a9\"> </span> value change recognized in OCI is r<span class=\"_ _4\"></span>ecyc<span class=\"_ _4\"></span>led to profit or loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s debt instruments at fair value through OCI<span class=\"_ _1a9\"> </span> includes investments in quoted debt instr<span class=\"_ _4\"></span>uments (bonds)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>DERE<span class=\"_ _4\"></span>COGNITION<span class=\"_ _1a9\"> </span>A financial asset (or<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> where applicab<span class=\"_ _4\"></span>le<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> a part of a financial<span class=\"_ _3\"></span> asset or part of a group of similar financial assets) is primarily<span class=\"_ _3\"></span> derecognized (i.e<span class=\"_ _4\"></span>.,<span class=\"_ _4\"></span> r<span class=\"_ _4\"></span>emoved from the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s consolidated<span class=\"_ _1a9\"> </span> statement of financial position) when:<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _6c\"> </span><span class=\"wse3\">The rights to receive cash fl<span class=\"_ _4\"></span>ows from the asset ha<span class=\"_ _4\"></span>ve<span class=\"_ _1a9\"> </span></span><span class=\"wse3\"> </span>expired; or<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _6c\"> </span><span class=\"ws19e\">The Compan<span class=\"_ _4\"></span>y has transferr<span class=\"_ _4\"></span>ed its rights to receive cash<span class=\"_ _1a9\"> </span></span><span class=\"ws19e\"> </span>flows fr<span class=\"_ _4\"></span>om the asset or has assumed an obligation to<span class=\"_ _1a9\"> </span> pay the received cash flo<span class=\"_ _4\"></span>ws in full without material delay<span class=\"_ _1a9\"> </span> to a third party under a \u2018pass-through\u2019 arrangement and<span class=\"_ _1a9\"> </span> either (a) the Company has tr<span class=\"_ _4\"></span>ansferred substantially all<span class=\"_ _1a9\"> </span> the risks and rew<span class=\"_ _4\"></span>ards of the asset,<span class=\"_ _4\"></span> or (b) the Compan<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span> has neither transferr<span class=\"_ _4\"></span>ed nor retained substantially all the<span class=\"_ _1a9\"> </span> risks and rew<span class=\"_ _4\"></span>ards of the asset but has transf<span class=\"_ _4\"></span>erred contro<span class=\"_ _4\"></span>l<span class=\"_ _1a9\"> </span> of the asset.<span class=\"_ _1a9\"> </span>I<span class=\"_ _1a9\"> </span>MP<span class=\"_ _1\"></span>AIRMENT OF<span class=\"_ _4\"></span> FINA<span class=\"_ _4\"></span>NCIAL<span class=\"_ _4\"></span> ASSET<span class=\"_ _4\"></span>S<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y recognizes an allow<span class=\"_ _4\"></span>ance for expected cr<span class=\"_ _4\"></span>edit<span class=\"_ _1a9\"> </span> losses (<span class=\"ff3 ws5b\">\u201cECLs<span class=\"_ _4\"></span>\u201d<span class=\"ff1 wsd9\">) for all debt instruments not held at fair value<span class=\"_ _1a9\"> </span></span></span><span class=\"ff3 ws5b\"><span class=\"ff1 wsd9\"> </span></span>through profit or loss<span class=\"_ _4\"></span>. ECLs are based on the differ<span class=\"_ _4\"></span>ence<span class=\"_ _1a9\"> </span> between the contr<span class=\"_ _4\"></span>actual cash flows due in accordance with<span class=\"_ _1a9\"> </span> the contract and all the cash flo<span class=\"_ _4\"></span>ws that the Company expects<span class=\"_ _1a9\"> </span> to receive<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> discounted at an appro<span class=\"_ _4\"></span>ximation of the original<span class=\"_ _1a9\"> </span> effective interest r<span class=\"_ _4\"></span>ate. T<span class=\"_ _4\"></span>he expected cash flows will inc<span class=\"_ _4\"></span>lude<span class=\"_ _1a9\"> </span> cash flows fr<span class=\"_ _4\"></span>om the sale of collateral held or other credit en<span class=\"_ _4\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>hancements that are integral to the contr<span class=\"_ _4\"></span>actual terms<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>or trade receivables and term deposits<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the Compan<span class=\"_ _4\"></span>y applies<span class=\"_ _1a9\"> </span>a simplified approac<span class=\"_ _4\"></span>h in calculating ECLs. T<span class=\"_ _4\"></span>herefor<span class=\"_ _4\"></span>e,<span class=\"_ _1\"></span> the<span class=\"_ _3\"></span> Company does not tr<span class=\"_ _4\"></span>ack changes in cr<span class=\"_ _4\"></span>edit risk,<span class=\"_ _4\"></span> but instead<span class=\"_ _1a9\"> </span>recognizes a loss allo<span class=\"_ _4\"></span>wance based on lifetime ECLs at eac<span class=\"_ _4\"></span>h<span class=\"_ _1a9\"> </span>reporting date.<span class=\"_ _1a9\"> </span>Upon impairment,<span class=\"_ _4\"></span> the carrying amount of the financial assets<span class=\"_ _3\"></span> is directly r<span class=\"_ _4\"></span>educed by the impairment loss,<span class=\"_ _1\"></span> with the exception<span class=\"_ _3\"></span> of trade receivab<span class=\"_ _4\"></span>les. F<span class=\"_ _25\"></span>or trade receivables,<span class=\"_ _1\"></span> the carr<span class=\"_ _3\"></span>ying amount<span class=\"_ _3\"></span> is reduced b<span class=\"_ _4\"></span>y means of a separate impairment account. If a<span class=\"_ _1a9\"> </span>trade receivab<span class=\"_ _4\"></span>le is considered uncollectib<span class=\"_ _4\"></span>le,<span class=\"_ _1\"></span> it is written off in<span class=\"_ _3\"></span> the impairment account. Subsequent collection of amounts<span class=\"_ _1a9\"> </span>that had previously been written off is cr<span class=\"_ _4\"></span>edited in the impair<span class=\"_ _1\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>ment account. Modifications in the carr<span class=\"_ _3\"></span>ying amount of the<span class=\"_ _3\"></span> impairment account are recognized in the statement of pr<span class=\"_ _4\"></span>ofit<span class=\"_ _1a9\"> </span>and loss.<span class=\"_ _1a9\"> </span>CASH AND CASH<span class=\"_ _4\"></span> E<span class=\"_ _4\"></span>QUIV<span class=\"_ _1\"></span>ALENTS<span class=\"_ _1a9\"> </span>Cash and cash equivalents comprise demand deposits<span class=\"_ _1a9\"> </span>and other short-term, highl<span class=\"_ _4\"></span>y liquid investments (with less<span class=\"_ _1a9\"> </span>than three months to maturity) that are r<span class=\"_ _4\"></span>eadily convertible<span class=\"_ _1a9\"> </span>into a known amount of cash and ar<span class=\"_ _4\"></span>e subject to an insig<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>nificant risk of fluctuations in value<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial liabilities<span class=\"_ _1a9\"> </span>DISTIN<span class=\"_ _3\"></span>CTION BE<span class=\"_ _3\"></span>TWEEN FINAN<span class=\"_ _3\"></span>CIAL LIABILITIES<span class=\"_ _1a9\"> </span>AN<span class=\"_ _3\"></span>D<span class=\"_ _3\"></span> EQ<span class=\"_ _3\"></span>U<span class=\"_ _3\"></span>IT<span class=\"_ _23\"></span>Y<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial liabilities and equity instruments issued by the Gr<span class=\"_ _4\"></span>oup<span class=\"_ _1a9\"> </span>are classifi<span class=\"_ _4\"></span>ed according to the substance of the contractual<span class=\"_ _1a9\"> </span>arrangements enter<span class=\"_ _4\"></span>ed into and the definitions of a financial<span class=\"_ _1a9\"> </span>liability and an equity instrument. An equity instrument is an<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span>contract that evidences a residual inter<span class=\"_ _4\"></span>est in the assets of the<span class=\"_ _1a9\"> </span>Group after deducting all its liabilities<span class=\"_ _4\"></span>. The accounting policies<span class=\"_ _1a9\"> </span>adopted for specific financial liabilities and equity instruments<span class=\"_ _1a9\"> </span>are set out belo<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>IN<span class=\"_ _3\"></span>ITIAL R<span class=\"_ _3\"></span>ECOGNI<span class=\"_ _3\"></span>TIO<span class=\"_ _3\"></span>N AND M<span class=\"_ _3\"></span>E<span class=\"_ _3\"></span>ASU<span class=\"_ _3\"></span>REM<span class=\"_ _3\"></span>ENT<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial liabilities are c<span class=\"_ _4\"></span>lassified<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> at initial recognition,<span class=\"_ _4\"></span> at fair<span class=\"_ _1a9\"> </span>value through profit or loss,<span class=\"_ _1\"></span> loans and borrowings<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> payables<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> or as derivatives designated as hedging instruments in an<span class=\"_ _1a9\"> </span>effective hedge<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> as appropriate<span class=\"_ _4\"></span>. All financial liabilities are<span class=\"_ _1a9\"> </span>recognized initially at fair value and<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> in the case of loans<span class=\"_ _1a9\"> </span>and borro<span class=\"_ _4\"></span>wings and payables,<span class=\"_ _1\"></span> net of directly attributable<span class=\"_ _1a9\"> </span>transaction costs<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s financial liabilities include trade and other<span class=\"_ _1a9\"> </span>payables and convertible loans<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>SUBS<span class=\"_ _3\"></span>EQUENT ME<span class=\"_ _3\"></span>ASU<span class=\"_ _3\"></span>REMENT<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>or purposes of subsequent measurement,<span class=\"_ _1\"></span> financial liabili<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ties are classifi<span class=\"_ _4\"></span>ed in two categories:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Financial liabilities at fair value through pr<span class=\"_ _4\"></span>ofit or loss<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws1de\">Financial liabilities at amortized cost (loans and<span class=\"_ _1a9\"> </span></span>borro<span class=\"_ _4\"></span>wings)<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial liabilities at fair value through profit and loss<span class=\"_ _1a9\"> </span>include financial liabilities designated upon initial recogni<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion as at fair value through profit or loss and only if the<span class=\"_ _1a9\"> </span>criteria in IFRS 9 are satisfied<span class=\"_ _1\"></span>. The Group has designated<span class=\"_ _1a9\"> </span>convertible loans at fair value through profit and loss<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> since<span class=\"_ _1a9\"> </span>the convertible loans contain embedded derivatives for<span class=\"_ _1a9\"> </span>which assessment of whether it is requir<span class=\"_ _4\"></span>ed to separate the<span class=\"_ _1a9\"> </span>embedded derivative from the host contr<span class=\"_ _4\"></span>act to measure<span class=\"_ _1a9\"> </span>the derivative at fair value<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> w<span class=\"_ _4\"></span>ould be more complex or<span class=\"_ _1a9\"> </span>result in less reliab<span class=\"_ _4\"></span>le measures than measuring the entir<span class=\"_ _4\"></span>e<span class=\"_ _1a9\"> </span>instrument at fair value through profit or loss As suc<span class=\"_ _4\"></span>h the<span class=\"_ _1a9\"> </span>conditions in IFRS 9 4<span class=\"_ _4\"></span>.3<span class=\"_ _1\"></span>.5 are met and designation at fair<span class=\"_ _1a9\"> </span>value through profit or loss is permitted<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The convertible loans are measur<span class=\"_ _4\"></span>ed at fair value through<span class=\"_ _1a9\"> </span>profit or loss,<span class=\"_ _1\"></span> using the valuation methods described in<span class=\"_ _1a9\"> </span>note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.11<span class=\"_ _4\"></span>. T<span class=\"_ _25\"></span>ransaction costs in relation to these financial<span class=\"_ _1a9\"> </span>liabilities at fair value through profit or loss ar<span class=\"_ _4\"></span>e expensed as<span class=\"_ _1a9\"> </span>incurred and inc<span class=\"_ _4\"></span>luded in the line item \u2018F<span class=\"_ _4\"></span>inance expense\u2019 in<span class=\"_ _1a9\"> </span>the consolidated statement of profit and los<span class=\"_ _1a9\"> </span>s<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>T<span class=\"_ _25\"></span>rade and other payables are subsequently measured at amortized cost, using the eff<span class=\"_ _4\"></span>ective interest rate metho<span class=\"_ _1a9\"> </span>d<span class=\"_ _1a9\"> </span><span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>(O) <span class=\"_ _32\"> </span>EQUITY INS<span class=\"_ _4\"></span>TRUMENTS<span class=\"_ _1a9\"> </span>Equity instruments issued by the Gr<span class=\"_ _4\"></span>oup are recorded at the proceeds received<span class=\"_ _1\"></span>. Direct issue costs are processed as a deduction on equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>(P) <span class=\"_ _56\"> </span>FINANCIAL INCOME AND EXPENSES<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial income includes interest income on in<span class=\"_ _4\"></span>vested funds. Realized and unr<span class=\"_ _4\"></span>ealized exchange differ<span class=\"_ _4\"></span>ences are reported under financial income and expenses.<span class=\"_ _1a9\"> </span> (Q) <span class=\"_ _32\"> </span>SEGMENT REPORTING<span class=\"_ _1a9\"> </span>An operational segment is a component of an entity:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws18f\">which exercises operating activities with which pr<span class=\"_ _4\"></span>ofits </span>are gained and costs can be made (including pr<span class=\"_ _4\"></span>ofits and costs from transactions with other components of the entity);<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws39\">where the operational results are judged r<span class=\"_ _4\"></span>egularly b<span class=\"_ _4\"></span>y </span>the highest managerial function of the entity who can take important operational decisions in order to make decisions regarding the gr<span class=\"_ _4\"></span>anting of resources and to evaluate the financial results of the segment (chief operating decision maker); and<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws178\">for which separate financial information is availab<span class=\"_ _4\"></span>le and </span>that is engaged either in providing specific pr<span class=\"_ _4\"></span>oducts or ser<span class=\"_ _3\"></span>vices (business segment)<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> or in providing products or ser<span class=\"_ _3\"></span>vices within a par<span class=\"_ _3\"></span>ticular economic environment (geographical segment)<span class=\"_ _1\"></span>, and whic<span class=\"_ _4\"></span>h is subject to risks and rew<span class=\"_ _4\"></span>ards that are differ<span class=\"_ _4\"></span>ent from those of other segments.<span class=\"_ _1a9\"> </span>The segment information is r<span class=\"_ _4\"></span>epresented in a consistent manner regarding the internal r<span class=\"_ _4\"></span>eporting to the chief operating decision maker of the entity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> i.e<span class=\"_ _4\"></span>.,<span class=\"_ _4\"></span> the institu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion which takes the most important decisions,<span class=\"_ _4\"></span> enabling decision-making of allocating resources to the segment and evaluating financial performances of the segment. At this moment,<span class=\"_ _1\"></span> repor<span class=\"_ _3\"></span>ting is being done at a global level within Oxurion. (<span class=\"_ _1a9\"> </span>R) <span class=\"_ _56\"> </span>INVENTORIES<span class=\"_ _1a9\"> </span>Raw and ancillar<span class=\"_ _3\"></span>y materials and commodities are stated at the low<span class=\"_ _4\"></span>er of cost or net realizable value<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he inventor<span class=\"_ _3\"></span>y costing system is based on the FIFO-method<span class=\"_ _1\"></span>. Goods in process and finished goods are stated <span class=\"_ _4\"></span>at the standard manufacturing cost or net r<span class=\"_ _4\"></span>ealizable value<span class=\"_ _4\"></span>. The inventor<span class=\"_ _3\"></span>y costing system is based on the FIFO-method<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The net realizab<span class=\"_ _4\"></span>le value test is performed for each reporting period<span class=\"_ _4\"></span>. Net realizab<span class=\"_ _4\"></span>le value is the estimated selling price in the ordinar<span class=\"_ _3\"></span>y course of business less the estimated costs of completion and the estimated costs necessar<span class=\"_ _3\"></span>y to make the sale.<span class=\"_ _1a9\"> </span>The standard manuf<span class=\"_ _4\"></span>acturing price of the goods in process and of the finished goods,<span class=\"_ _1\"></span> includes (i) the acquisition value of the raw materials<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> (ii) consumab<span class=\"_ _4\"></span>les and ancillar<span class=\"_ _3\"></span>y materials,<span class=\"_ _1\"></span> (iii) the production costs that are directly attrib<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>utable to the product,<span class=\"_ _1\"></span> and (iv) the propor<span class=\"_ _3\"></span>tioned par<span class=\"_ _3\"></span>t of the production costs that are only indir<span class=\"_ _4\"></span>ectly attributab<span class=\"_ _4\"></span>le to the product,<span class=\"_ _4\"></span> in so far that these costs co<span class=\"_ _4\"></span>ver the normal pro<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>duction period<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The standard manuf<span class=\"_ _4\"></span>acturing price is compared to the actual manufacturing price on an annual basis<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and adjust<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments are made to the value of the inventory<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Impairment losses are calculated on the goods in-process<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> if their manufacturing cost,<span class=\"_ _1\"></span> increased with the estimated amount of the costs to be incurred is higher than the net sales price at year<span class=\"_ _1\"></span>-end<span class=\"_ _1a9\"> </span>Impairment losses on inventories are anal<span class=\"_ _4\"></span>yzed on a case-<span class=\"_ _1a9\"> </span>by-case basis if the net r<span class=\"_ _4\"></span>ealizable value is low<span class=\"_ _4\"></span>er than the<span class=\"_ _1a9\"> </span>cost. The calculation of the net realizab<span class=\"_ _4\"></span>le value takes into<span class=\"_ _1a9\"> </span>account the specific characteristics of the in<span class=\"_ _4\"></span>ventories,<span class=\"_ _1\"></span> including the due date and if there ar<span class=\"_ _4\"></span>e indications of a low<span class=\"_ _1a9\"> </span>rotation.<span class=\"_ _1a9\"> </span>5.5.4 <span class=\"_ _5b\"> </span><span class=\"ls11 ws27\">Main accounting est<span class=\"_ _4\"></span>imat<span class=\"_ _4\"></span>es,<span class=\"_ _1a9\"> </span></span>assumpt<span class=\"_ _4\"></span>ions and judgments<span class=\"_ _1a9\"> </span>Reporting the financial statements in accordance with IFRS<span class=\"_ _3\"></span> requires management to r<span class=\"_ _4\"></span>ely on estimates,<span class=\"_ _1\"></span> assumptions and<span class=\"_ _3\"></span> judgments that impact the amounts reported under assets<span class=\"_ _3\"></span> and liabilities,<span class=\"_ _1\"></span> the notes on the latent assets and liabilities on the<span class=\"_ _3\"></span> date of the financial statements,<span class=\"_ _1\"></span> and the repor<span class=\"_ _3\"></span>ted amounts of<span class=\"_ _3\"></span> income and expenditure in the course of the r<span class=\"_ _4\"></span>eporting period.<span class=\"_ _1a9\"> </span>The actual results may diff<span class=\"_ _4\"></span>er from these estimates.<span class=\"_ _1a9\"> </span>The main assumptions relating to futur<span class=\"_ _4\"></span>e developments and<span class=\"_ _1a9\"> </span>the main sources of uncertainty regarding estimates on the<span class=\"_ _1a9\"> </span>reporting date are set out below:<span class=\"_ _1a9\"> </span>Going Concern - material uncertainty<span class=\"_ _1a9\"> </span>The consolidated financial statements w<span class=\"_ _4\"></span>ere prepar<span class=\"_ _4\"></span>ed on a<span class=\"_ _1a9\"> </span>going concern basis<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s cash balance at December 31<span class=\"_ _1\"></span>, 2022,<span class=\"_ _1\"></span> of 3<span class=\"_ _4\"></span>.6<span class=\"_ _1a9\"> </span>million euro is not sufficient to fund the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s operations<span class=\"_ _1a9\"> </span>during the next twelve months<span class=\"_ _4\"></span>. How<span class=\"_ _4\"></span>ever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> post-closing,<span class=\"_ _1\"></span> the<span class=\"_ _1a9\"> </span>Group entered into the A<span class=\"_ _4\"></span>tlas Subscription Agreement.<span class=\"ws0\"> </span>This committed but conditional funding w<span class=\"_ _4\"></span>ould be sufficient<span class=\"_ _1a9\"> </span>to fund operations during the next tw<span class=\"_ _4\"></span>elve months from the<span class=\"_ _1a9\"> </span>financial statement\u2019<span class=\"_ _1\"></span>s issue date. Ho<span class=\"_ _4\"></span>wever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> given the contin<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>gent nature of this funding,<span class=\"_ _4\"></span> the Group is actively exp<span class=\"_ _4\"></span>loring<span class=\"_ _1a9\"> </span>the possibility of obtaining additional funding through debt,<span class=\"_ _1\"></span> equity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> or non-dilutive funding,<span class=\"_ _4\"></span> including the licensing of<span class=\"_ _1a9\"> </span>THR-149<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> or alternatively r<span class=\"_ _4\"></span>educing its costs and invest<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments so that there should be sufficient cash to continue<span class=\"_ _1a9\"> </span>its operations during the next tw<span class=\"_ _4\"></span>elve months.<span class=\"_ _1a9\"> </span>As the net-assets of the Company ar<span class=\"_ _4\"></span>e below 61<span class=\"_ _1\"></span>,500 euro<span class=\"_ _1a9\"> </span>(the statutor<span class=\"_ _3\"></span>y minimum amount of share capital of a<span class=\"_ _1a9\"> </span>Belgian public limited liability compan<span class=\"_ _4\"></span>y)<span class=\"_ _1\"></span>, in accordance with<span class=\"_ _1a9\"> </span>article 7:229 of the BCCA,<span class=\"_ _4\"></span> each inter<span class=\"_ _4\"></span>ested party is entitled<span class=\"_ _1a9\"> </span>to request the competent commercial court to dissolve the<span class=\"_ _1a9\"> </span>Company<span class=\"_ _25\"></span>. In such instance the court may order the disso<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lution of the Company or gr<span class=\"_ _4\"></span>ant a grace period within which<span class=\"_ _1a9\"> </span>the Company is allo<span class=\"_ _4\"></span>wed to r<span class=\"_ _4\"></span>emedy the situation.<span class=\"_ _1a9\"> </span>Based on the above<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the Board of Directors considers it<span class=\"_ _1a9\"> </span>may be reasonable to expect that ther<span class=\"_ _4\"></span>e will be sufficient<span class=\"_ _1a9\"> </span>cash to continue its operations during the next tw<span class=\"_ _4\"></span>elve<span class=\"_ _1a9\"> </span>months,<span class=\"_ _1\"></span> and therefore decided to continue its valuation<span class=\"_ _1a9\"> </span>rules under the assumption of going concern. Ho<span class=\"_ _4\"></span>wever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> there is a material uncertainty relating to going concern<span class=\"_ _1a9\"> </span>of the Group because it is uncertain that the above-men<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tioned committed but conditional funding will be availab<span class=\"_ _4\"></span>le<span class=\"_ _1a9\"> </span>when needed given the conditions related to the funding,<span class=\"_ _4\"></span> and because it is not certain whether the Group will be<span class=\"_ _1a9\"> </span>able to timely obtain the necessary additional funding<span class=\"_ _1a9\"> </span>through debt,<span class=\"_ _4\"></span> equity or non-dilutive funding,<span class=\"_ _1\"></span> par<span class=\"_ _3\"></span>tnering or<span class=\"_ _1a9\"> </span>to realize sufficient cost and investment r<span class=\"_ _4\"></span>eductions.<span class=\"_ _1a9\"> </span>Convertible loans<span class=\"_ _1a9\"> </span>The Group has con<span class=\"_ _4\"></span>vertible loans with Negma and Kreos<span class=\"_ _1a9\"> </span>Capital / Pontif<span class=\"_ _4\"></span>ax V<span class=\"_ _4\"></span>entur<span class=\"_ _4\"></span>es. T<span class=\"_ _4\"></span>he convertible loans are<span class=\"_ _1a9\"> </span>measured at fair value through pr<span class=\"_ _4\"></span>ofit and loss. In deter<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mining the fair value<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the Group makes certain judgments<span class=\"_ _1a9\"> </span>on the valuation model to be applied and the probability<span class=\"_ _1a9\"> </span>that certain scenarios will occur or not in the future. The<span class=\"_ _1a9\"> </span>terms and conditions and further information is provided<span class=\"_ _1a9\"> </span>in note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.11<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Revenue from Contracts with Customer<span class=\"_ _4\"></span>s<span class=\"_ _1a9\"> </span>Under the five-step model established b<span class=\"_ _4\"></span>y the IFRS 15<span class=\"_ _1a9\"> </span>standard<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _4\"></span>s main estimates and assessments relate<span class=\"_ _1a9\"> </span>to identifying the performance obligations under its contracts<span class=\"_ _1a9\"> </span>and allocating the transaction price according to the stand-<span class=\"_ _1a9\"> </span>alone price of each of the performance obligations<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws24e gs56\">The majority of the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s sources of revenue are </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws1aa gs57\">derived from sales of JETREA\u00ae vials through our w<span class=\"_ _4\"></span>orldwide </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws62 gs58\">license agreement with Inceptua and the tripartite agreement </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws198 gs5a\">with Eumedica. The Group has determined that ther<span class=\"_ _4\"></span>e is </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws43 gs5b\">only one performance obligation for all contracts in p<span class=\"_ _4\"></span>lace </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws1a6 gs8a\">with customers,<span class=\"_ _1\"></span> that is to deliver the JETREA\u00ae product to<span class=\"_ _3\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws142 gs8b\">the customer<span class=\"_ _1\"></span>. Therefor<span class=\"_ _4\"></span>e,<span class=\"_ _1\"></span> the transaction price is equal to the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws0 gs8c\">stand-alone selling price of each vial.<span class=\"_ _1a9\"> </span></div><div class=\"gs10f\"><table class=\"s w1b3 h4c\" id=\"_f01cdb9e-a39a-40c4-85d3-4b63c54fedae\"><tr><td></td><td class=\"t m1 x12d h12 y5bb ff3 fsb fc7 sc0 ls1b wsbe\">STEP<span class=\"_ _108\"> </span><span class=\"ws0\">REVENUE FROM SALE OF VIALS<span class=\"_ _1a9\"> </span></span></td></tr><tr><td></td><td class=\"t m2 x296 h13 y5bc ff1 fsc fc7 sc0 ls0 ws0\">Oxurion has a contract in place </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5bd ff1 fsc fc7 sc0 ls0 ws0\">with Inceptua and Eumedica for </td></tr><tr><td class=\"t m0 x12d h14 y5be ff2 fsd fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>. Identification of the contract<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x296 h13 y5be ff1 fsc fc7 sc0 ls0 ws0\">the commercialization of JETREA\u00ae </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5bf ff1 fsc fc7 sc0 ls0 ws0\">as disclosed in Note 5<span class=\"_ _4\"></span>.8 under Key </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5c0 ff1 fsc fc7 sc0 ls0 ws0\">Agreements.<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m0 x12d h14 y5c1 ff2 fsd fc7 sc0 ls0 ws0\">2. Identification of performance  </td><td class=\"t m2 x296 h13 y5c2 ff1 fsc fc7 sc0 ls0 ws0\">In all distribution contracts,<span class=\"_ _4\"></span> ther<span class=\"_ _4\"></span>e is </td></tr><tr><td class=\"t m0 x12d h14 y5c3 ff2 fsd fc7 sc0 ls0 ws0\">obligations<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x296 h13 y5c4 ff1 fsc fc7 sc0 ls0 ws0\">only one performance obligation: </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5c5 ff1 fsc fc7 sc0 ls0 ws0\">supply of goods to a third party<span class=\"_ _1\"></span>. </td></tr><tr><td class=\"t m0 x12d h14 y5c6 ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>. Identification of the transaction price<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x296 h13 y5c7 ff1 fsc fc7 sc0 ls0 ws0\">Stand-alone price per vial is defined </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5c8 ff1 fsc fc7 sc0 ls0 ws0\">in each agreement with the customer<span class=\"_ _1\"></span>. </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5c9 ff1 fsc fc7 sc0 ls0 ws0\">As there is only one performance </td></tr><tr><td class=\"t m0 x12d h14 y5ca ff2 fsd fc7 sc0 ls0 ws0\">4. Allocation of the tr<span class=\"_ _4\"></span>ansaction price<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x296 h13 y5cb ff1 fsc fc7 sc0 ls0 ws0\">obligation,<span class=\"_ _4\"></span> there is no allocation of the </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5cc ff1 fsc fc7 sc0 ls0 ws0\">price,<span class=\"_ _4\"></span> and therefor<span class=\"_ _4\"></span>e stand-alone price </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5cd ff1 fsc fc7 sc0 ls0 ws0\">per vial is recognized<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td class=\"t m2 x296 h13 y5ce ff1 fsc fc7 sc0 ls0 ws0\">Revenue is recognized upon delivery </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5cf ff1 fsc fc7 sc0 ls0 ws0\">to the customer<span class=\"_ _4\"></span>. Returns are cr<span class=\"_ _4\"></span>edited </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5d0 ff1 fsc fc7 sc0 ls0 ws0\">strictly at discretion of Oxurion,<span class=\"_ _4\"></span> and </td></tr><tr><td class=\"t m0 x12d h14 y5d1 ff2 fsd fc7 sc0 ls0 ws0\">5<span class=\"_ _4\"></span>. Revenue recognition<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x296 h13 y5d2 ff1 fsc fc7 sc0 ls0 ws0\">a provision for US returns is made </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5d3 ff1 fsc fc7 sc0 ls0 ws0\">based on historical data. Rebate </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5d4 ff1 fsc fc7 sc0 ls0 ws0\">provisions for sales made outside the </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5d5 ff1 fsc fc7 sc0 ls0 ws0\">US<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> are made based on contractual </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5d6 ff1 fsc fc7 sc0 ls0 ws0\">agreements and/or local regulations<span class=\"_ _4\"></span>. </td></tr></table></div><div class=\"t m0 h17 ff8 fs9 fc7 sc0 ls0 ws0 gs110\">Share-based payment plans<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wse8 gs111\">The Group defines the cost of shar<span class=\"_ _4\"></span>e-based payment plans </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws99 gs112\">on the basis of the fair value of the equity instrument on </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws104 gs113\">the grant date<span class=\"_ _4\"></span>. Determining the fair value involves c<span class=\"_ _4\"></span>hoosing </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws10e gs114\">the most suitable valuation model for these equity instru<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsd6 gs115\">ments,<span class=\"_ _1\"></span> and the characteristics of the equity instrument and </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb8 gs116\">its issue have a decisive impact. It also assumes the input </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf1 gs117\">in the valuation model of a number of relevant assump<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws137 gs118\">tions,<span class=\"_ _1\"></span> such as the estimated useful life of the right,<span class=\"_ _4\"></span> volatility<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws127 gs119\">etc. T<span class=\"_ _4\"></span>he assessments and the model are specified in mor<span class=\"_ _4\"></span>e </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs11a\">detail in note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.8<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h17 ff8 fs9 fc7 sc0 ls0 ws0 gs1a\">Capitalization and impairment of intangible assets </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws149 gs59\">The Group accounts for as intang<span class=\"_ _4\"></span>ible assets only rights </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws9c gs1c\">and intellectual property if acquired from third parties and </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws33 gs1d\">costs of internal development only if the conditions for the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws15d gs1e\">recognition of intangib<span class=\"_ _4\"></span>le assets are met,<span class=\"_ _1\"></span> other<span class=\"_ _23\"></span>wise such </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb6 gs1f\">costs are included in the statement of pr<span class=\"_ _4\"></span>ofit and loss when </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1b6 gs8d\">they arise. T<span class=\"_ _4\"></span>he costs are capitalized only if the product is in </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws177 gs20\">Phase 3 and the chances of future success ar<span class=\"_ _4\"></span>e estimated </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws24f gs60\">as highly probable<span class=\"_ _4\"></span>. Accounting estimates and assess<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa6 gs8e\">ments of future business evo<span class=\"_ _4\"></span>lution,<span class=\"_ _4\"></span> gro<span class=\"_ _4\"></span>wth,<span class=\"_ _4\"></span> sales<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> likelihood </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws17b gs23\">of success and discount rate are f<span class=\"_ _4\"></span>actors used in valuing </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb9 gs11b\">the intangible asset to execute the annual impairment test.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h17 ff8 fs9 fc7 sc0 ls0 ws0 gs26\">T<span class=\"_ _25\"></span>axes<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws8c gs6b\">The Group considers that ther<span class=\"_ _4\"></span>e is a considerab<span class=\"_ _4\"></span>le uncer<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws79 gs6d\">tainty regarding the futur<span class=\"_ _4\"></span>e use of the tax losses of Oxurion </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws78 gs2a\">as it is ver<span class=\"_ _3\"></span>y difficult to estimate the impact of the patent </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws8b gs93\">deduction on the future tax result at this moment. As the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws105 gs94\">Group can only use the abo<span class=\"_ _4\"></span>vementioned patent deduction </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsac gs72\">on the basis of a tax ruling,<span class=\"_ _4\"></span> the expectation exists that the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsab gs2e\">future tax gains will be rather limited<span class=\"_ _1\"></span>. There is also the un<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws7b gs74\">certainty regarding the future use of the tax losses with </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs76\">ThromboGenic<span class=\"_ _1a9\"> </span>s<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 hd ff3 fs8 fc4 sc0 ls27 ws18b gs32\">5.5.<span class=\"_ _3\"></span>5 <span class=\"_ _5a\"> </span><span class=\"ls11 ws27\">Segment inf<span class=\"_ _4\"></span>ormation<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws250 gs9b\">Segment information is repr<span class=\"_ _4\"></span>esented in a consistent </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws249 gs7b\">manner regarding the internal r<span class=\"_ _4\"></span>eporting to the chief </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws57 gs7c\">operating decision maker of the entity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> i.e<span class=\"_ _4\"></span>.,<span class=\"_ _4\"></span> the person or </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsab gs7e\">persons that takes the most important decisions,<span class=\"_ _4\"></span> enabling </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws132 gs7f\">decision-making of allocating resources to the segment </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb4 gs9e\">and evaluating financial performances of the segment. At </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws2a gs11c\">this moment,<span class=\"_ _4\"></span> reporting is being done at global level within </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs11d\">Oxurion<span class=\"_ _1a9\"> </span>. </div>5.5.5<span class=\"_ _4\"></span>.1  <span class=\"_ _109\"> </span>Product sales information<span class=\"_ _1a9\"> </span>Product sales relate only to JETREA\u00ae and ar<span class=\"_ _4\"></span>e reported in<span class=\"_ _1a9\"> </span>note 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.1.<span class=\"_ _1a9\"> </span>5.5.5<span class=\"_ _4\"></span>.2 <span class=\"_ _7a\"> </span>Geogr<span class=\"_ _4\"></span>aphic information<span class=\"_ _1a9\"> </span>The Global R&amp;D<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> Clinical Operations and most of the<span class=\"_ _1a9\"> </span>General and Administr<span class=\"_ _4\"></span>ative functions are located in<span class=\"_ _1a9\"> </span>Leuven,<span class=\"_ _4\"></span> Belgium. T<span class=\"_ _4\"></span>hese operations repr<span class=\"_ _4\"></span>esent approxi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mately 95% of the operating r<span class=\"_ _4\"></span>esult. In the context of the<span class=\"_ _1a9\"> </span>Company\u2019<span class=\"_ _1\"></span>s business<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> these activities do not lead to the<span class=\"_ _1a9\"> </span>need for geographic information.<span class=\"_ _1a9\"> </span>100% of intangible assets and almost all non-curr<span class=\"_ _4\"></span>ent<span class=\"_ _1a9\"> </span>assets are located in Belgium.<span class=\"_ _1a9\"> </span>5.5.5<span class=\"_ _4\"></span>.3 <span class=\"_ _10a\"> </span>Business unit reporting<span class=\"_ _1a9\"> </span>Oxurion is a biotechnology company with focus on<span class=\"_ _1a9\"> </span>diseases related to the retina.<span class=\"_ _1a9\"> </span>Our molecules,<span class=\"_ _1\"></span> ocriplasmin on the market with brand<span class=\"_ _1a9\"> </span>name JETREA\u00ae,<span class=\"_ _4\"></span> the plasma kallikr<span class=\"_ _4\"></span>ein inhibitor in a Phase<span class=\"_ _1a9\"> </span>2 clinical trial and the pan-RGD integrin inhibitor which is<span class=\"_ _1a9\"> </span>currently on ho<span class=\"_ _4\"></span>ld<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> represent more than 95% of the income<span class=\"_ _1a9\"> </span>and expenses of the Company<span class=\"_ _25\"></span>. As a consequence,<span class=\"_ _1\"></span> the<span class=\"_ _1a9\"> </span>consolidated statement of profit and loss and of financial<span class=\"_ _1a9\"> </span>position are a valid repr<span class=\"_ _4\"></span>esentation of its business unit as a<span class=\"_ _1a9\"> </span>whole<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.5.5<span class=\"_ _4\"></span>.4 <span class=\"_ _10a\"> </span>Information about major customers<span class=\"_ _1a9\"> </span>Oxurion has one customer that individually accounts for<span class=\"_ _1a9\"> </span>more than 7<span class=\"_ _25\"></span>4% of the total income at the end of 2022<span class=\"_ _1a9\"> </span>(2021: 73%)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.5.6<span class=\"_ _3\"></span> <span class=\"_ _59\"> </span><span class=\"ls11 ws27\">Financial inst<span class=\"_ _4\"></span>ruments<span class=\"_ _1a9\"> </span></span>The Compan<span class=\"_ _4\"></span>y has the following financial instr<span class=\"_ _4\"></span>uments<span class=\"_ _1a9\"> </span>measured at amortized cost: trade receivables<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> cash and<span class=\"_ _1a9\"> </span>cash equivalents,<span class=\"_ _1\"></span> investments,<span class=\"_ _4\"></span> trade payab<span class=\"_ _4\"></span>les,<span class=\"_ _1\"></span> lease liabili<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ties and other short term liabilities.<span class=\"_ _1a9\"> </span>As of December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> the majority of cash and cash<span class=\"_ _1a9\"> </span>equivalents are cash at banks availab<span class=\"_ _4\"></span>le on demand<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Besides these financial instruments,<span class=\"_ _1\"></span> the Company also<span class=\"_ _1a9\"> </span>issued convertible bonds measured at fair value through<span class=\"_ _1a9\"> </span>profit and los since 2021 with two parties as described in<span class=\"_ _1a9\"> </span>note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.11<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial assets and financial liabilities are included in the<span class=\"_ _1a9\"> </span>Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s statement of financial position when the Group<span class=\"_ _1a9\"> </span>becomes a party to the contractual provisions of the<span class=\"_ _1a9\"> </span>instrument.<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>air V<span class=\"_ _4\"></span>alues<span class=\"_ _1a9\"> </span>There is no significant diff<span class=\"_ _4\"></span>erence between <span class=\"_ _4\"></span>the fair value<span class=\"_ _1a9\"> </span>and carr<span class=\"_ _3\"></span>ying amount of the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _4\"></span>s cash and cash equiv<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>alents,<span class=\"_ _1\"></span> investments,<span class=\"_ _4\"></span> trade and other r<span class=\"_ _4\"></span>eceivables<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> other<span class=\"_ _1a9\"> </span>current assets<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> trade payab<span class=\"_ _4\"></span>les and other current liabilities<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The carrying amount of cash and cash equivalents and<span class=\"_ _1a9\"> </span>investments is equal to their fair value<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> given the shor<span class=\"_ _3\"></span>t-<span class=\"_ _1a9\"> </span>term maturity of these financial instruments<span class=\"_ _4\"></span>. Similarly<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> the<span class=\"_ _1a9\"> </span>carr<span class=\"_ _3\"></span>ying amounts of receivables and payab<span class=\"_ _4\"></span>les,<span class=\"_ _1\"></span> which are<span class=\"_ _1a9\"> </span>all subject to normal trade credit terms<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> ar<span class=\"_ _4\"></span>e equivalent to<span class=\"_ _1a9\"> </span>their fair values<span class=\"_ _4\"></span>. Investments in bonds are measur<span class=\"_ _4\"></span>ed at<span class=\"_ _1a9\"> </span>fair value based on quoted market prices<span class=\"_ _4\"></span>. The fair value<span class=\"_ _1a9\"> </span>movements ar<span class=\"_ _4\"></span>e recorded in OCI<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The class A Negma con<span class=\"_ _4\"></span>vertible loan is measured at fair<span class=\"_ _1a9\"> </span>value as the nominal amount of the convertible loan plus<span class=\"_ _1a9\"> </span>8%,<span class=\"_ _4\"></span> which is the diff<span class=\"_ _4\"></span>erence betw<span class=\"_ _4\"></span>een the share price and<span class=\"_ _1a9\"> </span>the 92% of the low<span class=\"_ _4\"></span>est closing VW<span class=\"_ _25\"></span>AP (8%) (level 1)<span class=\"_ _4\"></span>. The<span class=\"_ _1a9\"> </span><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws3a gs100\">class B Negma convertible loan is measured at f<span class=\"_ _4\"></span>air value </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws156 gs53\">as the nominal amount of the convertible loan plus 20%,<span class=\"_ _1\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws62 gs86\">which is the differ<span class=\"_ _4\"></span>ence between the share prices and 80% </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs88\">of the closing VW<span class=\"_ _25\"></span>AP (20%) (level 1).<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws210 gs56\">The Kreos Capital / P<span class=\"_ _4\"></span>ontifax V<span class=\"_ _1\"></span>entures convertible loan </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws3b gs57\">is measured at fair value wher<span class=\"_ _4\"></span>eby fair value is estimated </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1fd gs58\">considering probabilities of the occurrence of diff<span class=\"_ _4\"></span>erent </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1b5 gs5a\">scenarios. T<span class=\"_ _4\"></span>he probabilities are estimated b<span class=\"_ _4\"></span>y the Group </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws128 gs5b\">and consist level 3 fair value assessments<span class=\"_ _4\"></span>. A reasonable </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws26 gs8a\">change of the probabilities betw<span class=\"_ _4\"></span>een the different scenario<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs8b\">would not lead to a material c<span class=\"_ _4\"></span>hange in the fair value<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 hd ff3 fs8 fc4 sc0 ls27 ws18b gs103\">5.5.7<span class=\"_ _3\"></span> <span class=\"_ _5e\"> </span><span class=\"ls11 ws27\">Financial ri<span class=\"_ _4\"></span>sk manag<span class=\"_ _4\"></span>ement<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws52 gs63\">The financial department of the parent Company coor<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1f gs65\">dinates access to the national and international financial </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws11d gs66\">markets and considers and manages the financial risks </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws46 gs68\">relating to the activities of the Group<span class=\"_ _1\"></span>. The financial risks </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1ee gsa8\">related to the operating activities of the Gr<span class=\"_ _4\"></span>oup are confined </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws15d gs6a\">to a minimal currency exc<span class=\"_ _4\"></span>hange rate risk. Ther<span class=\"_ _4\"></span>e are no </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws136 gs6c\">risks worth mentioning,<span class=\"_ _4\"></span> such as liquidity risks or interest </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws177 gs6e\">rate risks as the Group has no debts with variab<span class=\"_ _4\"></span>le interest </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsac gs6f\">rates<span class=\"_ _4\"></span>. The Group does not b<span class=\"_ _4\"></span>uy or trade in financial instru<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsa9\">ments for speculative purposes<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h17 ff2 fs9 fc7 sc0 ls0 ws0 gs73\">(A) <span class=\"_ _41\"> </span>CAPIT<span class=\"_ _25\"></span>AL MANA<span class=\"_ _4\"></span>GEMENT<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws6a gsaa\">The Group manages its capital with the aim of ensuring </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws188 gs98\">that the Group can continue to operate<span class=\"_ _4\"></span>. At the same </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws100 gsf\">time,<span class=\"_ _1\"></span> the Group wishes to generate a return for its stake<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsfd gs78\">holders via the results of its r<span class=\"_ _4\"></span>esearch activities<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> which in </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws50 gs79\">turn are expected to lead to an increase in the value of </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1cf gs7a\">the Company\u2019<span class=\"_ _1\"></span>s shares<span class=\"_ _4\"></span>. This str<span class=\"_ _4\"></span>ateg<span class=\"_ _3\"></span>y has not changed </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs12\">compared to previous y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws137 gs7d\">The capital structur<span class=\"_ _4\"></span>e of the Group consists of investments,<span class=\"_ _1\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf9 gs106\">cash,<span class=\"_ _4\"></span> cash equivalents and restricted cash,<span class=\"_ _1\"></span> and equity at<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws25 gs80\">tributable to the equity ho<span class=\"_ _4\"></span>lders of the Company<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> inc<span class=\"_ _4\"></span>luding </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsfd gs82\">capital,<span class=\"_ _4\"></span> reserves and results carried over<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> as indicated in </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs17\">notes 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.7<span class=\"_ _4\"></span> and 5<span class=\"_ _1\"></span>.7<span class=\"_ _25\"></span>.8 respectively<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws172 gs101\">The Group manages its capital structur<span class=\"_ _4\"></span>e and makes the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa2 gs54\">necessar<span class=\"_ _3\"></span>y adjustments in light of changes in economic </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws18d gs87\">circumstances,<span class=\"_ _1\"></span> the risk characteristics of the underlying </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws17c gs18\">assets and the projected cash requir<span class=\"_ _4\"></span>ements of current </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws40 gs19\">researc<span class=\"_ _4\"></span>h activities. When assessing the capital structur<span class=\"_ _4\"></span>e<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws4d gs1a\">the current cash position and projected cash b<span class=\"_ _4\"></span>urn are used </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws13e gs1b\">as the key parameters<span class=\"_ _4\"></span>. Cash burn is defined as the net </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws17b gs59\">result corr<span class=\"_ _4\"></span>ected for depreciation and amortization,<span class=\"_ _4\"></span> stock<span class=\"_ _1\"></span>-<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs1c\">based compensation,<span class=\"_ _4\"></span> and less investments in fixed assets<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1a gs1e\">The Group wishes to maintain a capital structur<span class=\"_ _4\"></span>e that is </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws6e gs1f\">sufficient to fund researc<span class=\"_ _4\"></span>h activities during a period of at </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb6 gs8d\">least twelve months<span class=\"_ _4\"></span>. Any cash infl<span class=\"_ _4\"></span>ows from possib<span class=\"_ _4\"></span>le coop<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb4 gs20\">eration agreements or other cash gener<span class=\"_ _4\"></span>ating activities are </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws6d gs104\">not taken into account. T<span class=\"_ _25\"></span>o maintain the capital structure,<span class=\"_ _1\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs62\">the Group can issue new shares or conc<span class=\"_ _4\"></span>lude new </div><div class=\"t m0 h17 ff2 fs9 fc7 sc0 ls0 ws0 gsb1\">(B) <span class=\"_ _56\"> </span>MAIN A<span class=\"_ _4\"></span>CCOUNTING PRINCIPLES<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws171 gs26\">Details of the main accounting principles and methods,<span class=\"_ _1\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws4a gs69\">including the inclusion criteria,<span class=\"_ _1\"></span> the valuation basis,<span class=\"_ _4\"></span> and the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws12f gs6b\">basis on which income and costs are r<span class=\"_ _4\"></span>ecognized<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> for each </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb0 gs6d\">categor<span class=\"_ _3\"></span>y of financial assets,<span class=\"_ _4\"></span> liabilities<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and equity instru<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs2a\">ments,<span class=\"_ _1\"></span> are explained under 5<span class=\"_ _1\"></span>.5<span class=\"_ _4\"></span>.3<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h17 ff2 fs9 fc7 sc0 ls0 ws0 gs94\">(C) <span class=\"_ _35\"> </span>CA<span class=\"_ _25\"></span>TEGORIES OF FINANCIAL </div><div class=\"t m0 h17 ff2 fs9 fc7 sc0 ls0 ws0 gs11f\">INS<span class=\"_ _4\"></span>TRUMENTS<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws3a gs74\">The financial instruments curr<span class=\"_ _4\"></span>ently held by the Compan<span class=\"_ _4\"></span>y </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs76\">are:<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs31\">\u2022 <span class=\"_ _62\"> </span>T<span class=\"_ _1\"></span>rade receivables and payab<span class=\"_ _4\"></span>les<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs32\">\u2022 <span class=\"_ _62\"> </span>Shor<span class=\"_ _3\"></span>t-term financial liabilities<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs33\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws108\">Cash, cash equivalents and in<span class=\"_ _4\"></span>vestments (we r<span class=\"_ _4\"></span>efer to </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws18f gs120\">note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.6) amounting to 3<span class=\"_ _1\"></span>.6 million euro (2021: 10<span class=\"_ _1\"></span>.0 </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws19 gs121\">million euro)<span class=\"_ _4\"></span>. In<span class=\"_ _4\"></span>vestments are mainly in very low risk </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs122\">bonds and term investments<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs7e\">\u2022 <span class=\"_ _62\"> </span>Conver<span class=\"_ _3\"></span>tible bonds (we r<span class=\"_ _4\"></span>efer to note 5<span class=\"_ _1\"></span>.5<span class=\"_ _4\"></span>.6<span class=\"_ _1a9\"> </span>)<span class=\"_ _1a9\"> </span></div>(D) <span class=\"_ _41\"> </span>MARKET RISK<span class=\"_ _1a9\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s activities are such that the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s income is<span class=\"_ _1a9\"> </span> exposed to financial risks arising from currency exc<span class=\"_ _4\"></span>hange<span class=\"_ _1a9\"> </span> rate fluctuations because a substantial proportion of<span class=\"_ _1a9\"> </span> the researc<span class=\"_ _4\"></span>h expenditure is invoiced in USD and pound<span class=\"_ _1a9\"> </span> sterling (GBP)<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he Group tries to compensate the inflo<span class=\"_ _4\"></span>ws<span class=\"_ _1a9\"> </span> and outflows in f<span class=\"_ _4\"></span>oreign currenc<span class=\"_ _1a9\"> </span>y<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>Analysis of sensitivity to exchange r<span class=\"_ _4\"></span>ates<span class=\"_ _1a9\"> </span>The Group is mainly exposed to fluctuations in GBP and<span class=\"_ _1a9\"> </span> USD against the euro<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The sensitivity of loss to changes in the exc<span class=\"_ _4\"></span>hange rates<span class=\"_ _1a9\"> </span> arises mainly from USD and GBP denominated financial<span class=\"_ _1a9\"> </span> instruments<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span><table class=\"s w1b4 h4d\" id=\"_dd1e7635-0d12-4b2b-a1ff-eab6487d2add\"><tr><td class=\"c n x129 y5d7 w1b5 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">N '000 EURO<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x297 y5d7 w1b6 h41\" colspan=\"2\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IMP<span class=\"_ _1\"></span>ACT ON P<span class=\"_ _4\"></span>AS<span class=\"_ _4\"></span>T T<span class=\"_ _1\"></span>AX LOSS<span class=\"_ _1a9\"> </span></div></td></tr><tr><td></td><td class=\"c n x298 y5d8 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x299 y5d8 w1b7 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y5d9 ff2 fsd fc7 sc0 ls0 ws0\">USD/euro exchange rate increase 10%<span class=\"_ _1a9\"> </span></td><td class=\"c n x29a y5da wad h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">163<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x29b y5da w1b8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-339<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y5db ff2 fsd fc7 sc0 ls0 ws0\">USD/euro exchange rate decrease 10%<span class=\"_ _1a9\"> </span></td><td class=\"c n x29c y5dc w1b9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-200<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x29d y5dc w1ba h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls4d ws252\">41<span class=\"_ _3\"></span>5<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y5dd ff2 fsd fc7 sc0 ls0 ws0\">GBP/euro exchange rate increase 10%<span class=\"_ _1a9\"> </span></td><td class=\"c n x29e y518 w1bb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x29f y518 w1bc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">6<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y5de ff2 fsd fc7 sc0 ls0 ws0\">GBP/euro exchange rate decrease 10%<span class=\"_ _1a9\"> </span></td><td class=\"c n x2a0 y515 w150 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-9<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a1 y515 w14d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-<span class=\"_ _1a9\"> </span>7<span class=\"_ _1a9\"> </span></div></td></tr></table>(E) <span class=\"_ _74\"> </span>INTERES<span class=\"_ _4\"></span>T RISK MANA<span class=\"_ _4\"></span>GEMENT<span class=\"_ _1a9\"> </span>At the moment,<span class=\"_ _1\"></span> the Group has external debt financing<span class=\"_ _1a9\"> </span> with a fixed interest rate<span class=\"_ _4\"></span>. The Gr<span class=\"_ _4\"></span>oup does not have an<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span> contracts with a variable inter<span class=\"_ _4\"></span>est rate<span class=\"_ _4\"></span>. Consequently<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> there<span class=\"_ _1a9\"> </span> is currently no need f<span class=\"_ _4\"></span>or a specific interest risk manage<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ment policy in the Group<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>(F) <span class=\"_ _74\"> </span>CREDIT RISK MANA<span class=\"_ _4\"></span>GEMENT<span class=\"_ _1a9\"> </span>Credit risk relates to the risk that a counterparty will fail to<span class=\"_ _1a9\"> </span> fulfil their contractual ob<span class=\"_ _4\"></span>ligations with the result that the<span class=\"_ _1a9\"> </span> Group would suff<span class=\"_ _4\"></span>er a loss. T<span class=\"_ _4\"></span>he Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s policy focuses on<span class=\"_ _1a9\"> </span> only working with cr<span class=\"_ _4\"></span>edit-worthy counterparties and<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> where<span class=\"_ _1a9\"> </span> necessar<span class=\"_ _3\"></span>y<span class=\"_ _25\"></span>, r<span class=\"_ _4\"></span>equiring adequate securities. Inf<span class=\"_ _4\"></span>ormation about<span class=\"_ _1a9\"> </span> the creditw<span class=\"_ _4\"></span>orthiness of counterpar<span class=\"_ _3\"></span>ties is provided by inde<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>pendent ratings agencies and<span class=\"_ _1\"></span>, if this is not a<span class=\"_ _4\"></span>vailable<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the<span class=\"_ _1a9\"> </span> Group uses information that is pub<span class=\"_ _4\"></span>licly availab<span class=\"_ _4\"></span>le as well<span class=\"_ _1a9\"> </span> as its own internal r<span class=\"_ _4\"></span>ecords. Cr<span class=\"_ _4\"></span>edit risk is managed by the<span class=\"_ _1a9\"> </span> financial department of Oxurion by means of individual<span class=\"_ _1a9\"> </span> follo<span class=\"_ _4\"></span>w-up of credit per counterparty<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The Group has a limited number of customer<span class=\"_ _4\"></span>s. Cr<span class=\"_ _4\"></span>edit<span class=\"_ _1a9\"> </span> risk is considered as remote due to a history of no issues<span class=\"_ _1a9\"> </span> with payment collection. So far<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the collection of payments<span class=\"_ _1a9\"> </span> happened without any delay and with limited cr<span class=\"_ _4\"></span>edit risk.<span class=\"_ _1a9\"> </span>The credit risk on cash in<span class=\"_ _4\"></span>vestments is limited given that the<span class=\"_ _1a9\"> </span> counterparties are banks with high credit scores attributed<span class=\"_ _1a9\"> </span> by international r<span class=\"_ _4\"></span>ating agencies<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span><div class=\"t m0 h17 ff2 fs9 fc7 sc0 ls0 ws0 gs132\">(G) <span class=\"_ _35\"> </span>LIQUIDITY RISK MANA<span class=\"_ _1\"></span>GEMENT<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws18 gs133\">The Group manages its liquidity risk b<span class=\"_ _4\"></span>y ensuring adequate </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws125 gs134\">reser<span class=\"_ _3\"></span>ves and by constantly c<span class=\"_ _4\"></span>hecking the projected and </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws127 gs135\">actual cash flows<span class=\"_ _4\"></span>. A<span class=\"_ _4\"></span>t the moment,<span class=\"_ _4\"></span> the Group is not subject </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs136\">to any substantial liquidity risk.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1aa gs137\">Contractual undiscounted maturities of financial liabilities </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs138\">at December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021 and 2022 are as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span></div><div class=\"gs139\"><table class=\"s w1bd h4e\" id=\"_b7fa71f0-875d-4b8e-9040-198dc456c426\"><tr><td class=\"t m1 x12d h12 y5df ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T<span class=\"_ _3\"></span> <span class=\"ls0\"> </span></td><td class=\"c n x2a2 y5e0 w1be h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">LESS THAN 6 MONTHS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a3 y5e0 w1bf h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">6 - 12 MONTHS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a4 y5e0 w1c0 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">BETWEEN 1 AND 2 YEARS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a5 y5e0 w1c1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">BETWEEN 2 AND 5 YEARS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a6 y5e0 w1c2 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">OVER 5 YEARS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a7 y5e0 w1c3 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m1 x12d h12 y5e1 ff3 fsb fc7 sc0 ls1b ws0\">31 DECEMBER 2021)<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y5e2 wfd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Lease liabilities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a8 y5e2 w3b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">162<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x219 y5e2 w4a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">59<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a9 y5e2 w1c4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">30<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2aa y5e2 w1c5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">15<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ab y5e2 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ac y5e2 w1c6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">266<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5e3 w103 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Convertible loans<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ad y5e3 w1c7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">300<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ae y5e3 w1c8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,910<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2af y5e3 w1c9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,464<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b0 y5e3 w1ca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">5<span class=\"_ _4\"></span>,187<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b1 y5e3 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b2 y5e3 wca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">11<span class=\"_ _4\"></span>,861<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5e4 w108 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>rade payables<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b3 y5e4 w1cb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,979<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b4 y5e4 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b5 y5e4 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b6 y5e4 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b7 y5e4 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b8 y5e4 w1cc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,979<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5e5 w10d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other short-term liabilities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b9 y5e5 w1cd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">628<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ba y5e5 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2bb y5e5 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2bc y5e5 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2bd y5e5 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2be y5e5 w1cd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">628<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5e6 w1ce h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal financial liabilities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2bf y5e6 w1cf h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">6<span class=\"_ _1\"></span>,069<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c0 y5e6 w1d0 h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">1,969<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c1 y5e6 w1d1 h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">4,494<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c2 y5e6 w1d2 h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">5,202<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c3 y5e6 w1d3 h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c4 y5e6 w1d4 h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">17<span class=\"_ _1\"></span>,734<span class=\"_ _1a9\"> </span></div></td></tr></table></div>N '000 EURO (AS A<span class=\"_ _1\"></span>T<span class=\"_ _3\"></span> <span class=\"ls0\"> </span>31 DECEMBER 2022)<span class=\"_ _1a9\"> </span>LESS THAN 6 MONTHS<span class=\"_ _100\"> </span>6 - 12 MONTHS<span class=\"_ _1e\"> </span>BETWEEN 1 AND 2 YEARS<span class=\"_ _1d\"> </span>BETWEEN 2 AND 5 YEARS<span class=\"_ _2b\"> </span>OVER 5 YEARS<span class=\"_ _17\"> </span><span class=\"ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _1a9\"> </span></span>Lease liabilities<span class=\"_ _14\"> </span>88<span class=\"_ _fc\"> </span>78<span class=\"_ _57\"> </span>144<span class=\"_ _114\"> </span>389<span class=\"_ _114\"> </span>394<span class=\"_ _116\"> </span>1<span class=\"_ _4\"></span>,093<span class=\"_ _1a9\"> </span>Convertible loans<span class=\"_ _117\"> </span>1<span class=\"_ _4\"></span>,728<span class=\"_ _111\"> </span>1,728<span class=\"_ _6f\"> </span>3<span class=\"_ _4\"></span>,456<span class=\"_ _57\"> </span><span class=\"ls4d ws252\">5<span class=\"_ _23\"></span>41<span class=\"_ _85\"> </span></span>0<span class=\"_ _116\"> </span>7<span class=\"_ _1\"></span>,453<span class=\"_ _1a9\"> </span>T<span class=\"_ _1\"></span>rade payables<span class=\"_ _118\"> </span>5<span class=\"_ _4\"></span>,040<span class=\"_ _85\"> </span>0<span class=\"_ _112\"> </span>0<span class=\"_ _85\"> </span>0<span class=\"_ _112\"> </span>0<span class=\"_ _6f\"> </span>5<span class=\"_ _4\"></span>,040<span class=\"_ _1a9\"> </span>Other short-term liabilities<span class=\"_ _10f\"> </span>2,813<span class=\"_ _85\"> </span>0<span class=\"_ _112\"> </span>0<span class=\"_ _85\"> </span>0<span class=\"_ _85\"> </span>0<span class=\"_ _116\"> </span>2,813<span class=\"_ _1a9\"> </span>T<span class=\"_ _1\"></span>otal financial liabilities<span class=\"_ _10d\"> </span>9<span class=\"_ _1\"></span>,669<span class=\"_ _6f\"> </span>1,806<span class=\"_ _29\"> </span>3<span class=\"_ _4\"></span>,600<span class=\"_ _17\"> </span>930<span class=\"_ _10d\"> </span>394<span class=\"_ _88\"> </span>16<span class=\"_ _1\"></span>,399<span class=\"_ _1a9\"> </span>5.5.<span class=\"_ _3\"></span>8 <span class=\"_ _5a\"> </span><span class=\"ls0 ws0\">Remunera<span class=\"_ _4\"></span>tio<span class=\"_ _4\"></span>n of Key </span>Managemen<span class=\"_ _4\"></span>t Personnel<span class=\"_ _1a9\"> </span>Key management personnel wer<span class=\"_ _4\"></span>e constituted in 2022 of:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>T<span class=\"_ _1\"></span>om Graney \u2013 CEO<span class=\"_ _1a9\"> </span>The key management personnel constitute the CEO as per Company\u2019<span class=\"_ _1\"></span>s corporate c<span class=\"_ _4\"></span>hapter<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Remuneration of key management personnel w<span class=\"_ _4\"></span>as as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span><table class=\"s w1d5 h50\" id=\"_011b3fee-bd93-47df-9c7d-4a4e43b3cf94\"><tr><td class=\"t m1 x12d h12 y5e7 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (EXCEPT FOR THE NUMBER OF ST<span class=\"_ _4\"></span>OCK </td><td class=\"c n x2c5 y5e8 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c6 y5e8 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m1 x12d h12 y5e9 ff3 fsb fc7 sc0 ls1b ws0\">OPTIONS) (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y5ea w1d6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Short-term benefits - consultancy fees / salar<span class=\"_ _3\"></span>y<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c7 y5ea w1d7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">562<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c8 y5ea w102 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">652<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5eb w1d8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ermination benefits<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c9 y5eb w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ca y5eb w1d9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">159<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ec w1da h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Cost of stock options granted in the year<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2cb y5ec w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2cc y5ec w1db h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">662<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w1dc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Number of stock options granted in the year<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2cd y515 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ce y515 w1dd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">600<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span></div></td></tr></table>No loans,<span class=\"_ _1\"></span> quasi-loans or other guarantees have been given to any of the executive dir<span class=\"_ _4\"></span>ectors<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>5.5.9<span class=\"_ _3\"></span> <span class=\"_ _59\"> </span><span class=\"ls0 ws0\">CO<span class=\"_ _4\"></span>VID-<span class=\"_ _1\"></span>19 i<span class=\"_ _4\"></span>mpact and Russ<span class=\"_ _4\"></span>ia\u2019<span class=\"_ _1\"></span>s </span>invasion of Ukraine<span class=\"_ _1a9\"> </span>Covid-19 Impact<span class=\"_ _1a9\"> </span>In 2022,<span class=\"_ _4\"></span> the global co<span class=\"_ _4\"></span>vid-19 situation improved consider<span class=\"_ _25\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ably allo<span class=\"_ _4\"></span>wing business to be carried out in normal condi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tions again.<span class=\"_ _1a9\"> </span>Russia<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s invasion of Ukraine<span class=\"_ _1a9\"> </span>Russia<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s invasion of Ukraine and sanctions <span class=\"_ _4\"></span>tow<span class=\"_ _4\"></span>ards Russia does not have direct impact on Oxurion<span class=\"_ _1\"></span>\u2019<span class=\"_ _4\"></span>s business as the company has no dir<span class=\"_ _4\"></span>ect relations with Russia,<span class=\"_ _1\"></span> nor with Ukraine<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.6<span class=\"_ _3\"></span> <span class=\"_ _db\"> </span><span class=\"ls10 ws14\">NOTES T<span class=\"_ _4\"></span>O THE CON<span class=\"_ _3\"></span>SOLI<span class=\"_ _3\"></span>DA<span class=\"_ _25\"></span>TED </span>ST<span class=\"_ _25\"></span>A<span class=\"_ _25\"></span>TEME<span class=\"_ _4\"></span>NT OF PROF<span class=\"_ _4\"></span>IT A<span class=\"_ _4\"></span>ND L<span class=\"_ _4\"></span>OSS<span class=\"_ _1a9\"> </span>5<span class=\"_ _3\"></span>.<span class=\"_ _23\"></span>6<span class=\"_ _23\"></span>.1<span class=\"_ _23\"></span> <span class=\"_ _12\"> </span><span class=\"ls4e ws4a\">Income<span class=\"_ _1a9\"> </span></span><table class=\"s w1de h51\" id=\"_f78bbcdf-e209-4aa5-91a3-4ecdeb70e5da\"><tr><td class=\"c n xf0 y5ed w114 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2cf y5ed w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d0 y5ed w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w1df h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Sales<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d1 y56b w1e0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">442<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d2 y56b w1e1 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">967<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w1e2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Income from royalties<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d3 y5ba w1e3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">153<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d4 y5ba w1e4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">161<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w1e5 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal revenue<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d5 y515 w71 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">595<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d6 y515 w1e6 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">1,128<span class=\"_ _1a9\"> </span></div></td></tr></table>In 2020<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion entered into a global license agr<span class=\"_ _4\"></span>eement with Inceptua for the commercialization of JETREA\u00ae.<span class=\"_ _1a9\"> </span>In 2022,<span class=\"_ _4\"></span> Oxurion JETREA\u00ae sales amounted to 0<span class=\"_ _25\"></span>.4 million euro<span class=\"_ _3\"></span> out of which 91% is attributed to Belg<span class=\"_ _4\"></span>ium and the remaining to other countries. In 2021<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion JETREA\u00ae sales amounted to 1<span class=\"_ _4\"></span>.0 million euro out of whic<span class=\"_ _4\"></span>h 61% was attrib<span class=\"_ _4\"></span>uted to Belgium and the remaining to other countries<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or fur<span class=\"_ _3\"></span>ther details we ref<span class=\"_ _4\"></span>er to the Key Agreements<span class=\"_ _4\"></span>\u2019 section as disclosed in note 5<span class=\"_ _1\"></span>.8<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.6.<span class=\"_ _23\"></span>2<span class=\"_ _3\"></span> <span class=\"_ _69\"> </span><span class=\"ls4f ws1ae\">C<span class=\"_ _3\"></span>ost<span class=\"_ _3\"></span> of s<span class=\"_ _3\"></span>ale<span class=\"_ _3\"></span>s<span class=\"_ _1a9\"> </span></span><table class=\"s w1e7 h51\" id=\"_d0b5ecdc-e081-4a59-a049-3fcc2557c797\"><tr><td class=\"c n xf0 y5ed w114 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2cf y5ed w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d0 y5ed w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w1e8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">License rights on sales<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d7 y56b w1e9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-46<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d8 y56b w1ea h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-48<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w1eb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Cost of goods<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d9 y5ba w1ec h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-467<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2da y5ba w1ed h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-564<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w1ee h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal cost of sales<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2db y515 w1ef h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-513<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2dc y515 w1f0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-612<span class=\"_ _1a9\"> </span></div></td></tr></table>The license rights on sales include the r<span class=\"_ _4\"></span>oyalties that Oxurion ow<span class=\"_ _4\"></span>es to the companies RCT and LSRP on the basis of JETREA\u00ae sales. 5.6.<span class=\"_ _3\"></span>3<span class=\"_ _3\"></span> <span class=\"_ _67\"> </span><span class=\"ls34 ws0\">Resear<span class=\"_ _4\"></span>ch and dev<span class=\"_ _4\"></span>elopmen<span class=\"_ _4\"></span>t expenses<span class=\"_ _1a9\"> </span></span><table class=\"s w1d5 h52\" id=\"_bca3b4a4-f263-4a7d-8730-5f4a7f135906\"><tr><td class=\"c n xf0 y5ee w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2de y5ee w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y5ee w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ef w1f2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e0 y5ef w1f3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3<span class=\"_ _4\"></span>,231<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e1 y5ef w1f4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,900<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f0 w1f5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Subcontracted R&amp;D activities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e2 y5f0 w1f6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-10<span class=\"_ _4\"></span>,668<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e3 y5f0 w1f7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-11<span class=\"_ _4\"></span>,451<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f1 w1f8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Reagents and materials<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e4 y5f1 w1f9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-88<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e5 y5f1 w1fa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-419<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f2 w1fb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Patent expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e6 y5f2 w1fc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-107<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e7 y5f2 w1ec h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-279<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f3 w1fd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Consultancy fees<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e8 y5f3 w1fe h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,2<span class=\"_ _4\"></span>46<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e9 y5f3 w1ff h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1,984<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y569 w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ea y569 w200 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-389<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2eb y569 w201 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-260<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w202 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Depreciation and amortization<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ec y56a w203 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-307<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ed y56a w204 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-584<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w205 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Government grants<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ee y56b w6b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ef y56b w206 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">84<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w207 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Income from recharge of costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f0 y5ba w208 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">47<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f1 y5ba w209 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">97<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w20a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal research and development expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f2 y515 w20b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-15<span class=\"_ _4\"></span>,986<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f3 y515 w20c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-20<span class=\"_ _4\"></span>,696<span class=\"_ _1a9\"> </span></div></td></tr></table>The decrease in emp<span class=\"_ _4\"></span>loy<span class=\"_ _4\"></span>ee benefits in 2022 compared to 2021 is mainly the result of the decision of the Compan<span class=\"_ _4\"></span>y taken in 2021 to reduce the headcount to focus on its c<span class=\"_ _4\"></span>linical assets,<span class=\"_ _1\"></span> hence the severance attributable to these reductions wer<span class=\"_ _4\"></span>e included in 2021<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The subcontracted R&amp;D activities r<span class=\"_ _4\"></span>elate to the outsourced ser<span class=\"_ _3\"></span>vices used to develop Oxurion\u2019<span class=\"_ _25\"></span>s projects in the preclinical and clinical phase<span class=\"_ _4\"></span>. The costs in 2021 and 2022 are mainl<span class=\"_ _4\"></span>y the cost related to the THR-149 and THR-687<span class=\"_ _1\"></span> clinical studies.<span class=\"_ _1a9\"> </span>In 2022,<span class=\"_ _4\"></span> other expenses w<span class=\"_ _4\"></span>ere 0<span class=\"_ _25\"></span>.4 million euro compared to<span class=\"_ _3\"></span> 0<span class=\"_ _1\"></span>.3 million euro in 2021<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The go<span class=\"_ _4\"></span>vernment grants ar<span class=\"_ _4\"></span>e grants received from the <span class=\"_ _4\"></span>VLAIO<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> formerly kno<span class=\"_ _4\"></span>wn as IWT<span class=\"_ _25\"></span>. Oxurion currently has no gr<span class=\"_ _4\"></span>ant agreement with VLAIO<span class=\"_ _25\"></span>. These grants are pro<span class=\"_ _4\"></span>vided to Oxurion to support cer<span class=\"_ _3\"></span>tain R&amp;D activities. W<span class=\"_ _4\"></span>e ref<span class=\"_ _4\"></span>er to the accounting policy in note 5<span class=\"_ _1\"></span>.5<span class=\"_ _4\"></span>.3<span class=\"_ _1\"></span>.<span class=\"_ _3\"></span> Over the course of the project,<span class=\"_ _1\"></span> Oxurion repor<span class=\"_ _3\"></span>ts on the status of<span class=\"_ _3\"></span> activities and incurred expenditur<span class=\"_ _4\"></span>e to VLAIO on a regular basis to receive grant ad<span class=\"_ _4\"></span>vances. As suc<span class=\"_ _4\"></span>h Oxurion and VLAIO follo<span class=\"_ _4\"></span>w up over the course of the pr<span class=\"_ _4\"></span>ojects that all activities performed<span class=\"_ _3\"></span> will not deviate from the agreed scope and that the final gr<span class=\"_ _4\"></span>ant amount will not deviate from the initially agreed amounts<span class=\"_ _4\"></span>. Overall,<span class=\"_ _4\"></span> Oxurion is confident that the reasonab<span class=\"_ _4\"></span>le assurance as defined in the standard is reac<span class=\"_ _4\"></span>hed over the course of the project for the amounts spent up to that moment,<span class=\"_ _1\"></span> as the only<span class=\"_ _3\"></span> condition attached to the grant is to perform R&amp;D activities in<span class=\"_ _1a9\"> </span>l<span class=\"_ _1a9\"> </span>ine with the agreed-upon scope and in line with the set b<span class=\"_ _4\"></span>udget and maintain a presence in the same reg<span class=\"_ _4\"></span>ion. There ar<span class=\"_ _4\"></span>e no other conditions attached to the grants and the outcome of R&amp;D activities does not impact the decision of VLAIO whether the final grant will be received or not. Government gr<span class=\"_ _4\"></span>ants that compensate the Company for expenses incurred and income from the r<span class=\"_ _4\"></span>echarge of costs ar<span class=\"_ _4\"></span>e deducted from the researc<span class=\"_ _4\"></span>h and development expenses on a systematic basis in the same period in which the expenses are incurr<span class=\"_ _4\"></span>ed<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.6<span class=\"_ _3\"></span>.4<span class=\"_ _3\"></span> <span class=\"_ _5b\"> </span><span class=\"ls0 ws0\">General and admini<span class=\"_ _4\"></span>stra<span class=\"_ _4\"></span>tiv<span class=\"_ _4\"></span>e expenses<span class=\"_ _1a9\"> </span></span><table class=\"s w20d h53\" id=\"_b5ce43ae-68f0-487a-95f1-a7417e739e04\"><tr><td class=\"c n xf0 y5f4 w114 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f4 y5f4 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y5f4 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f3 w20e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e0 y5f3 w20f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,753<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f5 y5f3 w210 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-2,653<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y569 w1fd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Consultancy fees<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f6 y569 w211 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3<span class=\"_ _4\"></span>,14<span class=\"_ _4\"></span>1<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f7 y569 w133 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3,470<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w212 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Insurance<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f8 y56a w213 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-361<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f9 y56a w214 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-343<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2fa y56b w215 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-692<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2fb y56b w145 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-622<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w216 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Depreciation and amortization<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2fc y5ba w217 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-33<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2fd y5ba w1e9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-62<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w218 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal general and administrative expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2fe y515 w219 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,980<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ff y515 w21a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-7<span class=\"_ _1\"></span>,150<span class=\"_ _1a9\"> </span></div></td></tr></table>The most important piece of the general and administra<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tive expenses are ICT contractor<span class=\"_ _4\"></span>s,<span class=\"_ _1\"></span> management, audit fees<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> Board of Directors<span class=\"_ _1\"></span>\u2019 fees,<span class=\"_ _4\"></span> investor r<span class=\"_ _4\"></span>elations contractors<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> legal and funding fees and HR ser<span class=\"_ _3\"></span>vices. 5.6.<span class=\"_ _3\"></span>5<span class=\"_ _3\"></span> <span class=\"_ _5a\"> </span><span class=\"ls18 ws95\">Selling exp<span class=\"_ _3\"></span>enses<span class=\"_ _1a9\"> </span></span><table class=\"s w21b h54\" id=\"_cb1253b5-b78b-443d-8f6d-db5c64901550\"><tr><td class=\"c n xf0 y5f5 w114 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f4 y5f5 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y5f5 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f6 w20e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x300 y5f6 w21c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-608<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x301 y5f6 w21d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-975<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f7 w21e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Distribution costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x302 y5f7 w21f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-68<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x303 y5f7 w220 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-91<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f8 w221 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Contractor and consultancy fees<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x304 y5f8 w222 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls4d ws252\">-<span class=\"_ _3\"></span>241<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x305 y5f8 w223 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-296<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f9 w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x306 y5f9 w224 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-183<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x307 y5f9 w225 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-116<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5fa w216 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Depreciation and amortization<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x308 y5fa w226 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-15<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x309 y5fa w227 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">-31<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5fb w228 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Income from recharge of costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x30a y5fb w229 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">223<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x30b y5fb w22a h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">235<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w22b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal selling expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x30c y515 w22c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-892<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x30d y515 w22d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,27<span class=\"_ _1\"></span>4<span class=\"_ _1a9\"> </span></div></td></tr></table>In 2022,<span class=\"_ _4\"></span> the selling expenses of Oxurion w<span class=\"_ _4\"></span>ere 0<span class=\"_ _25\"></span>.9 million euro compared to 1<span class=\"_ _1\"></span>.3 million euro in 2021<span class=\"_ _4\"></span>. The decrease is mainly a continuing effect of the outlicensing of JETREA\u00ae to Inceptua.<span class=\"_ _1a9\"> </span>5.6.6<span class=\"_ _3\"></span> <span class=\"_ _5a\"> </span><span class=\"ls0 ws0\">Other operat<span class=\"_ _4\"></span>ing inco<span class=\"_ _4\"></span>me<span class=\"_ _1a9\"> </span></span><table class=\"s w22e h55\" id=\"_0859cc36-68c9-4577-a7c8-bf8ecf069e4e\"><tr><td class=\"c n xf0 y5fc w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2de y5fc w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y5fc w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w83 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other operating income<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e6 y5ba w5a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">830<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x30e y5ba w85 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,245<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w22f h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal other operating income<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x30f y515 w230 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">830<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x310 y515 w231 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">1,2<span class=\"_ _4\"></span>45<span class=\"_ _1a9\"> </span></div></td></tr></table>In 2022,<span class=\"_ _4\"></span> Oxurion received other oper<span class=\"_ _4\"></span>ating income of 0<span class=\"_ _1\"></span>.8 million euro compared to 1<span class=\"_ _1\"></span>.2 million euro in 2021<span class=\"_ _4\"></span>. The accrued tax credit amounts to 0<span class=\"_ _25\"></span>.6 million euro in 2022 compared to<span class=\"_ _3\"></span> 0<span class=\"_ _1\"></span>.9 million euro in 2021<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.6.<span class=\"_ _3\"></span>7<span class=\"_ _3\"></span> <span class=\"_ _4c\"> </span><span class=\"ls4e ws22d\">Financ<span class=\"_ _4\"></span>e income<span class=\"_ _1a9\"> </span></span><table class=\"s w232 h56\" id=\"_9abac4d5-257e-4917-bb0d-3367a8ddf5b3\"><tr><td class=\"c n xf0 y5fd w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2de y5fd w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y5fd w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5fe w233 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Interest<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x311 y5fe w13e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">9<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x312 y5fe w13e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">9<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ff w234 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>air value adjustment convertible bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x313 y5ff w235 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">436<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x314 y5ff w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y600 w236 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Exchange rate gain (on USD and GBP)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x315 y600 w3b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">194<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x316 y600 w3b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">162<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w237 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal finance income<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x317 y515 w238 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">639<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x318 y515 w239 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">171<span class=\"_ _1a9\"> </span></div></td></tr></table>As a result of USD revaluations<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the unr<span class=\"_ _4\"></span>ealized exchange gain in 2022 amounted to 0<span class=\"_ _1\"></span>.177 million eur<span class=\"_ _4\"></span>o (2021: 0<span class=\"_ _1\"></span>.146 million euro) whereas 0<span class=\"_ _25\"></span>.017 million eur<span class=\"_ _4\"></span>o exchange gains w<span class=\"_ _4\"></span>ere realized (2021: 0<span class=\"_ _25\"></span>.016 million euro).<span class=\"_ _1a9\"> </span>The fair value adjustment con<span class=\"_ _4\"></span>vertible bonds relate for 0<span class=\"_ _1\"></span>.436 million euro to the Kreos/P<span class=\"_ _4\"></span>ontifax convertible bond (2021: 0<span class=\"_ _1\"></span>.025 million euro finance expense)<span class=\"_ _4\"></span>. W<span class=\"_ _1\"></span>e refer to note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.11 for more information.<span class=\"_ _1a9\"> </span>5.6.<span class=\"_ _3\"></span>8<span class=\"_ _3\"></span> <span class=\"_ _7f\"> </span><span class=\"ls3a ws95\">Finance expense<span class=\"_ _1a9\"> </span></span><table class=\"s w23a h57\" id=\"_3bd01f28-c0bc-4c8b-a544-2655691baabf\"><tr><td class=\"c n xf0 y601 w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2de y601 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y601 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y602 w23b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Bank costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x319 y602 w23c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-21<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31a y602 w23d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-26<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y603 w23e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Impairment on short-term financial investments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31b y603 w226 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-15<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31c y603 w23f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y604 w234 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>air value adjustment convertible bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31d y604 w240 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-7<span class=\"_ _25\"></span>,824<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31e y604 w241 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-372<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y605 w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31f y605 w242 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,349<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x320 y605 w243 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-713<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y606 w244 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Exchange rate loss (on USD and GBP)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x321 y606 w1fc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-170<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x322 y606 w1d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-152<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w245 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal finance expense<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x323 y515 w246 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-9<span class=\"_ _1\"></span>,379<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x324 y515 w247 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-1<span class=\"_ _1\"></span>,268<span class=\"_ _1a9\"> </span></div></td></tr></table>The fair value adjustment con<span class=\"_ _4\"></span>vertible bonds relate for 7<span class=\"_ _25\"></span>.824 million euro to the Negma convertible bond (2021: 0<span class=\"_ _1\"></span>.347<span class=\"_ _4\"></span> million euro)<span class=\"_ _4\"></span>. W<span class=\"_ _1\"></span>e refer to note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.11 for more information<span class=\"_ _1a9\"> </span>The other financial expenses relate f<span class=\"_ _4\"></span>or 0<span class=\"_ _1\"></span>.700 million euro to the Negma convertible bond (2021: 0<span class=\"_ _1\"></span>.525 million euro)<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 0<span class=\"_ _1\"></span>.636 million euro to the Kreos/P<span class=\"_ _4\"></span>ontifax convertible bond (2021: 0<span class=\"_ _1\"></span>.177 million eur<span class=\"_ _4\"></span>o) and 0<span class=\"_ _1\"></span>.013 million euro to other (2021: 0<span class=\"_ _1\"></span>.011 million euro)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>As a result of USD revaluations<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the unr<span class=\"_ _4\"></span>ealized exchange losses in 2022 amounted to 0<span class=\"_ _1\"></span>.004 million euro (2021: 0<span class=\"_ _1\"></span>.138 million euro) whereas 0<span class=\"_ _25\"></span>.166 million euro exchange losses wer<span class=\"_ _4\"></span>e realized (2021: 0<span class=\"_ _1\"></span>.014 million euro<span class=\"_ _1a9\"> </span>)<span class=\"_ _1a9\"> </span><span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>5.6.<span class=\"_ _3\"></span>9<span class=\"_ _3\"></span> <span class=\"_ _7f\"> </span><span class=\"ls21 ws27\">E<span class=\"_ _4\"></span>mploy<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></span><table class=\"s w25d h59\" id=\"_6d6b2b26-2099-4022-b6ef-1e0c711364f6\"><tr><td class=\"c n xf0 y608 w114 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f4 y608 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y608 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y609 w25e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Wages<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> salaries and bonuses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x339 y609 w25f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-4,456<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33a y609 w260 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-8<span class=\"_ _4\"></span>,030<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y60a w261 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Share-based compensation expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33b y60a w262 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-933<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33c y60a w263 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,107<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y60b w264 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Pension costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33d y60b w11b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-203<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33e y60b w213 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-391<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y60c w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33f y60c w111 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,592<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x340 y60c w265 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-9<span class=\"_ _4\"></span>,528<span class=\"_ _1a9\"> </span></div></td></tr></table>The pension costs included in the tab<span class=\"_ _4\"></span>le above consist f<span class=\"_ _4\"></span>or 0<span class=\"_ _1\"></span>.149 million euro (2021: 0<span class=\"_ _1\"></span>.37<span class=\"_ _25\"></span>4 million euro) of costs related to defined benefit plans and for 0<span class=\"_ _25\"></span>.054 million euro (2021:<span class=\"_ _3\"></span> 0<span class=\"_ _1\"></span>.017<span class=\"_ _4\"></span> million euro) of costs r<span class=\"_ _4\"></span>elated to defined contribution plans<span class=\"_ _4\"></span>. W<span class=\"_ _4\"></span>e ref<span class=\"_ _4\"></span>er to note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.9 for more information on the defined benefit plans<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The aver<span class=\"_ _4\"></span>age number of full<span class=\"_ _4\"></span>-time equivalents (including executive directors) w<span class=\"_ _4\"></span>as as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span><table class=\"s w248 h58\" id=\"_9a2c8cf0-85c2-4780-ae1e-11189846e6c9\"><tr><td class=\"c n xf0 y607 w249 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN NUMBERS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x325 y607 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x326 y607 w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w24a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Research and development<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x327 y56a w208 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">27<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x328 y56a w24b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">45<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w24c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">General and administration<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x329 y56b w1bb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32a y56b w24d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">10<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w24e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Selling<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32b y5ba w24f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32c y5ba w250 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32d y515 w252 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">35<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32e y515 w253 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">56<span class=\"_ _1a9\"> </span></div></td></tr></table>The share-based compensation expense inc<span class=\"_ _4\"></span>luded in the statement of profit and loss is given belo<span class=\"_ _4\"></span>w:<span class=\"_ _1a9\"> </span><table class=\"s w254 h58\" id=\"_d35bd503-5f9f-4345-95ba-b173b45e2916\"><tr><td class=\"c n x129 y607 w6d h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">N '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32f y607 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x330 y607 w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w255 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Research and development expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x331 y56a w256 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">427<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x332 y56a w257 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">289<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w258 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">General and administrative expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x333 y56b w1d7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">495<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x334 y56b w259 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">798<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w7f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Selling expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x335 y5ba w25a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">11<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x336 y5ba wcc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">20<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x337 y515 w25b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">933<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x338 y515 w25c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,107<span class=\"_ _1a9\"> </span></div></td></tr></table>W<span class=\"_ _4\"></span>e refer to note 5<span class=\"_ _1\"></span>.7<span class=\"_ _25\"></span>.8<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> for fur<span class=\"_ _3\"></span>ther information regarding the share-based payment plans<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5<span class=\"_ _3\"></span>.<span class=\"_ _23\"></span>6<span class=\"_ _23\"></span>.1<span class=\"_ _23\"></span>0<span class=\"_ _23\"></span> <span class=\"_ _78\"> </span><span class=\"ls51 ws256\">Ta<span class=\"_ _5\"></span>x<span class=\"_ _27\"></span>e<span class=\"_ _5\"></span>s<span class=\"_ _1a9\"> </span></span><table class=\"s w266 h58\" id=\"_b75957b9-00c9-4408-9e74-576722d78596\"><tr><td class=\"c n xf0 y607 w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x341 y607 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x342 y607 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w267 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Current tax expense<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x343 y56a w14d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x344 y56a w9c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w268 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Deferred tax expense<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x345 y56b wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x346 y56b w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y518 w269 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax expenses in income statement<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x347 y518 w26a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x348 y518 w26b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-3<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w26c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">Effective tax rate<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x349 y515 w26d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1\"></span>.0%<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x34a y515 w26d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1\"></span>.0%<span class=\"_ _1a9\"> </span></div></td></tr></table>The tax expense as sho<span class=\"_ _4\"></span>wn above has been calculated in conformity with local and international tax laws<span class=\"_ _4\"></span>. The tax on the Company\u2019<span class=\"_ _1\"></span>s loss (-)/ profit befor<span class=\"_ _4\"></span>e tax differs from the theoretical amount that w<span class=\"_ _4\"></span>ould arise using the domestic rate in Belgium on loss (-) / profit of <span class=\"_ _4\"></span>the year and is as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span><table class=\"s w26e h5a\" id=\"_9c6df2dc-19b0-4470-a922-7f5ee064c6fa\"><tr><td class=\"c n xf0 y60d w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2de y60d w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y60d w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y60e w26f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Loss (-) / profit before tax<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x34b y60e w270 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-31<span class=\"_ _4\"></span>,686<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x34c y60e w271 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-29<span class=\"_ _4\"></span>,592<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x34d h13 y60f ff1 fsc fc7 sc0 ls0 ws0\">Expected tax based on tax rate of the parent </td><td class=\"c n x34e y610 w272 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,921<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x34f y610 w1a0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,398<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x34d h13 y611 ff1 fsc fc7 sc0 ls0 ws0\">company (25% - theoretical)<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y612 w273 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Disallowed expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e6 y612 w274 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-231<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x350 y612 w226 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-51<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y613 w275 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax deductions and non-taxable income<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x351 y613 w132 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">152<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x352 y613 w175 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">144<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y614 w276 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Change in unrecognized deferred taxes<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x353 y614 w277 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,961<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x354 y614 w278 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-9<span class=\"_ _4\"></span>,947<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y517 w279 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Difference in tax rates from other jurisdictions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x355 y517 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x356 y517 w150 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-6<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y518 w27a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Permanent differences<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x357 y518 w27b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,888<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x358 y518 w27c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,459<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w27d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax expense of the year (effective)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x359 y515 w14d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x35a y515 w151 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3<span class=\"_ _1a9\"> </span></div></td></tr></table>The main differ<span class=\"_ _4\"></span>ence between the theoretical tax and the effective tax for the y<span class=\"_ _4\"></span>ear 2021 and 2022 can be primarily explained b<span class=\"_ _4\"></span>y the unrecognized deferr<span class=\"_ _4\"></span>ed taxes for which the Company conservatively assesses that it is not likely that these will be utilized in the foreseeab<span class=\"_ _4\"></span>le future<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span><div class=\"t m0 hd ff3 fs8 fc4 sc0 lsf ws13 gs5e\">5<span class=\"_ _3\"></span>.<span class=\"_ _23\"></span>6<span class=\"_ _23\"></span>.1<span class=\"_ _23\"></span>1<span class=\"_ _23\"></span> <span class=\"_ _68\"> </span><span class=\"ls12 ws32\">R<span class=\"_ _4\"></span>esul<span class=\"_ _4\"></span>t per share<span class=\"_ _1a9\"> </span></span></div><div class=\"t m0 h17 ff8 fs9 fc7 sc0 ls0 ws0 gs173\">Earnings per share<span class=\"_ _1a9\"> </span></div><div class=\"t m4 he ff1 fs9 fc7 sc0 ls0 ws70 gs174\">The calculation of basic earnings/loss per share on </div><div class=\"t m4 he ff1 fs9 fc7 sc0 ls0 ws10e gs175\">December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> is based on the holder<span class=\"_ _4\"></span>s of ordinar<span class=\"_ _3\"></span>y </div><div class=\"t m4 he ff1 fs9 fc7 sc0 ls0 ws57 gs176\">shares attributab<span class=\"_ _4\"></span>le loss (-) / profit from 2022 (3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>.693) </div><div class=\"t m4 he ff1 fs9 fc7 sc0 ls0 ws175 gs177\">million euro (2021: (29<span class=\"_ _1\"></span>.595) million euro) and a w<span class=\"_ _4\"></span>eighted </div><div class=\"t m4 he ff1 fs9 fc7 sc0 ls0 wsce gs178\">average n<span class=\"_ _4\"></span>umber of ordinar<span class=\"_ _3\"></span>y shares outstanding during </div><div class=\"t m4 he ff1 fs9 fc7 sc0 ls0 ws146 gs179\">2022 of 85<span class=\"_ _1\"></span>,019<span class=\"_ _1\"></span>,833 (2021: 38<span class=\"_ _4\"></span>,4<span class=\"_ _4\"></span>10<span class=\"_ _25\"></span>,532),<span class=\"_ _1\"></span> calculated as </div><div class=\"t m4 he ff1 fs9 fc7 sc0 ls0 ws0 gs17a\">follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span></div><div class=\"gs17b\"><table class=\"s w27e h5b\" id=\"_6ae93e91-670a-4f5b-a683-1aa25b4c0b6c\"><tr><td></td><td class=\"c n x35b y615 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x35c y615 w1b7 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y616 w27f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Issued ordinary shares per 1 January<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x35d y616 w280 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">39<span class=\"_ _4\"></span>,067<span class=\"_ _25\"></span>,284<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x35e y616 w281 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">38,291<span class=\"_ _4\"></span>,950<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c xf0 y618 w282 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Effect of capital increases through issue of<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">shares<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x281 y619 w283 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">45<span class=\"_ _4\"></span>,952,549<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x35f y619 w284 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">118,582<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y61a ff1 fsc fc7 sc0 ls0 ws0\">A<span class=\"_ _4\"></span>verage number of ordinary shares per  </td><td class=\"c n x360 y61b w285 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">85<span class=\"_ _4\"></span>,019<span class=\"_ _1\"></span>,833<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x361 y61b w286 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">38,4<span class=\"_ _4\"></span>10<span class=\"_ _1\"></span>,532<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y61c ff1 fsc fc7 sc0 ls0 ws0\">31 December<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr></table></div><div class=\"gs17c\"><table class=\"s w287 h5c\" id=\"_0c8ffcfc-58eb-48ec-8579-2b21f8edab6d\"><tr><td class=\"c n xf0 y61d w288 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> EXCEPT FOR RESUL<span class=\"_ _25\"></span>T PER SHARE<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x362 y61d w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x363 y61d w1b7 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y518 w171 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Result of the year<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x208 y518 w289 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-31,693<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x364 y518 w28a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-29<span class=\"_ _4\"></span>,595<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w28b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Basic/Diluted result per share<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e8 y515 w28c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-0<span class=\"_ _4\"></span>.37<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x365 y515 wa8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-0<span class=\"_ _1\"></span>.7<span class=\"_ _3\"></span>7<span class=\"_ _1a9\"> </span></div></td></tr></table></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws89 gs12\">As consideration in exchange f<span class=\"_ _4\"></span>or ser<span class=\"_ _3\"></span>vices per<span class=\"_ _3\"></span>formed<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws8d gs13\">Group has granted subscription rights to b<span class=\"_ _4\"></span>uy ordinar<span class=\"_ _3\"></span>y </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs7d\">shares to the CEO and personnel. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1ec gs15\">In addition,<span class=\"_ _1\"></span> the Group also has convertible loans with </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws17f gs16\">Negma and Kreos/P<span class=\"_ _4\"></span>ontifax (see note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.11) for which </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs148\">potential ordinar<span class=\"_ _3\"></span>y shares can be issued upon conversion.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsc5 gs20\">The effect of these potential ordinary shares is anti-dilutive </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws7d gs60\">as there w<span class=\"_ _4\"></span>as a loss in 2022 and 2021<span class=\"_ _4\"></span>. As such,<span class=\"_ _1\"></span> the diluted </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws54 gs8e\">earnings per share are the same as <span class=\"_ _4\"></span>the basic earnings per </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs23\">share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws163 gs17d\">See note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.8 for an overview of the number of outstand<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs17e\">ing subscription rights at each y<span class=\"_ _4\"></span>ear<span class=\"_ _1\"></span>-end<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div>5.7<span class=\"_ _3\"></span> <span class=\"_ _6\"> </span><span class=\"ls0 ws0\">NOT<span class=\"_ _4\"></span>ES T<span class=\"_ _4\"></span>O T<span class=\"_ _4\"></span>HE CONSOLID<span class=\"_ _1\"></span>A<span class=\"_ _25\"></span>TED ST<span class=\"_ _25\"></span>A<span class=\"_ _25\"></span>TEMEN<span class=\"_ _4\"></span>T OF FINANC<span class=\"_ _4\"></span>IAL PO<span class=\"_ _4\"></span>SITION<span class=\"_ _1a9\"> </span></span>5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _5\"></span>1<span class=\"_ _2f\"></span> <span class=\"_ _b1\"> </span><span class=\"ls0 ws0\">Property<span class=\"_ _1\"></span>, plant and equipmen<span class=\"_ _4\"></span>t<span class=\"_ _1a9\"> </span></span><table class=\"s w28d h5d\" id=\"_f80092fb-cf2d-41a1-b1ba-01cd754ffa94\"><tr><td class=\"t m1 x12d h12 y61e ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x366 h12 y61f ff3 fsb fc7 sc0 ls1b ws0\">MACHINES<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> PLANT </td><td class=\"t m1 x367 h12 y61f ff3 fsb fc7 sc0 ls1b ws0\">FURNITURE AND </td><td class=\"t m1 x368 h12 y61e ff3 fsb fc7 sc0 ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td class=\"t m1 x369 h12 y620 ff3 fsb fc7 sc0 ls1b ws0\">AND EQUIPMENT<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x1fe h12 y620 ff3 fsb fc7 sc0 ls1b wsbe\">FITTINGS<span class=\"_ _1a9\"> </span></td><td></td></tr><tr><td class=\"t m2 x12d h13 y621 ff2 fsc fc7 sc0 ls0 ws0\">As at 1 January 2021<span class=\"_ _13f\"> </span><span class=\"ff1\"> <span class=\"_ _111\"> </span> <span class=\"_ _10f\"> </span> </span></td><td></td><td></td><td></td></tr><tr><td class=\"t m2 x12d h13 y622 ff1 fsc fc7 sc0 ls0 ws0\">Cost<span class=\"_ _1a9\"> </span></td><td class=\"t m0 x36a h28 y622 ff1 fsd fc7 sc0 ls0 ws0\">6<span class=\"_ _1\"></span>,67<span class=\"_ _4\"></span>4<span class=\"_ _1a9\"> </span></td><td class=\"c n x36b y623 w28e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,3<span class=\"_ _4\"></span>10<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x36c y623 w28f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">10<span class=\"_ _4\"></span>,984<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y624 ff1 fsc fc7 sc0 ls0 ws0\">Accumulated depreciation and disposals<span class=\"_ _1a9\"> </span></td><td class=\"t m0 x36d h28 y624 ff1 fsd fc7 sc0 ls0 ws0\">-6<span class=\"_ _1\"></span>,469<span class=\"_ _1a9\"> </span></td><td class=\"c n x36e y625 w290 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-4,276<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x36f y625 w291 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-10<span class=\"_ _4\"></span>,7<span class=\"_ _1\"></span>45<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y626 ff1 fsc fc7 sc0 ls0 ws0\">Exchange differences<span class=\"_ _1a9\"> </span></td><td class=\"t m0 x370 h28 y626 ff1 fsd fc7 sc0 ls0 ws0\">-26<span class=\"_ _1a9\"> </span></td><td class=\"c n x151 y627 w292 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">17<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x371 y627 w88 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-9<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y628 w293 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Net carrying amount<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x372 y628 w294 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">179<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x373 y628 w295 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">51<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x374 y628 w296 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">230<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h1d y629 ff2 fsc fc7 sc0 ls0 ws0\">Y<span class=\"_ _4\"></span>ear ended on 3<span class=\"_ _4\"></span>1 December 2021<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"t m2 x12d h13 y62a ff1 fsc fc7 sc0 ls0 ws0\">Additions<span class=\"_ _1a9\"> </span></td><td class=\"t m0 x1fd h28 y62a ff1 fsd fc7 sc0 ls0 ws0\">25<span class=\"_ _1a9\"> </span></td><td class=\"c n x375 y62b w297 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x376 y62b w298 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">32<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y62c ff1 fsc fc7 sc0 ls0 ws0\">Depreciation expenses<span class=\"_ _1a9\"> </span></td><td class=\"t m0 x370 h28 y62c ff1 fsd fc7 sc0 ls0 ws0\">-47<span class=\"_ _1a9\"> </span></td><td class=\"c n x377 y62d w175 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-30<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x378 y62d w299 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-77<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y62e ff1 fsc fc7 sc0 ls0 ws0\">Disposals<span class=\"_ _1a9\"> </span></td><td class=\"t m0 x370 h28 y62e ff1 fsd fc7 sc0 ls0 ws0\">-60<span class=\"_ _1a9\"> </span></td><td class=\"c n x151 y62f wa3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-8<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x379 y62f w21f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-68<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y630 ff1 fsc fc7 sc0 ls0 ws0\">Exchange differences<span class=\"_ _1a9\"> </span></td><td class=\"t m0 x37a h28 y630 ff1 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td><td class=\"c n x139 y631 w6b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x37b y631 w6b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y632 w293 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Net carrying amount<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x37c y632 w29a h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">97<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x37d y632 w162 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">23<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x37e y632 w29b h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">120<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h1d y633 ff2 fsc fc7 sc0 ls0 ws0\">As at 31 December 2021<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y634 w29c h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Cost<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x37f y634 w29d h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">6<span class=\"_ _1\"></span>,699<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x380 y634 w29e h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">4,3<span class=\"_ _4\"></span>17<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x381 y634 w29f h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">11<span class=\"_ _4\"></span>,016<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y635 w2a0 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Accumulated depreciation and disposals<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x382 y635 w2a1 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-6<span class=\"_ _1\"></span>,576<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x383 y635 w2a2 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-4,3<span class=\"_ _4\"></span>14<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x384 y635 w2a3 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-10,890<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y636 w2a4 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Exchange differences<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x385 y636 w2a5 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-26<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x386 y636 w253 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">20<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x387 y636 w2a6 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-6<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y637 w293 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Net carrying amount<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x37c y637 w29a h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">97<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x37d y637 w162 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">23<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x37e y637 w29b h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">120<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h1d y638 ff2 fsc fc7 sc0 ls0 ws0\">Y<span class=\"_ _4\"></span>ear ended on 3<span class=\"_ _4\"></span>1 December 2022<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y639 w2a7 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Additions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x388 y639 w2a8 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">28<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x373 y639 w2a9 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls41 ws225\">31<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x389 y639 w2aa h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">59<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y63a w2ab h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Depreciation expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x38a y63a w2ac h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-45<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x38b y63a w2ad h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-18<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x38c y63a w2ae h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-63<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y63b w2af h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Disposals<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x38d y63b w2a6 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-9<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x38e y63b w2b0 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x38f y63b w2b1 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-16<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y63c w2a4 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Exchange differences<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x390 y63c w2b2 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x391 y63c w2b3 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-1<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x392 y63c w2b3 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-1<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y63d w293 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Net carrying amount<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x393 y63d w2b4 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">71<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x394 y63d w2a8 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">28<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x395 y63d w2b5 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">99<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h1d y63e ff2 fsc fc7 sc0 ls0 ws0\">As at 31 December 2022<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y63f w29c h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Cost<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x396 y63f w2b6 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">6<span class=\"_ _4\"></span>,727<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x397 y63f w2b7 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">4,348<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x398 y63f w2b8 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">11<span class=\"_ _4\"></span>,075<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y640 w2a0 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Accumulated depreciation and disposals<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x399 y640 w2b9 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-6<span class=\"_ _1\"></span>,630<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x39a y640 w2ba h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-4,339<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x39b y640 w2bb h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-10<span class=\"_ _4\"></span>,969<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y641 w2a4 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Exchange differences<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x385 y641 w2a5 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-26<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x39c y641 w2bc h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">19<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x39d y641 w2b0 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">-7<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y642 w293 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Net carrying amount<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x393 y642 w2b4 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">71<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x394 y642 w2a8 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">28<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x395 y642 w2b5 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">99<span class=\"_ _1a9\"> </span></div></td></tr></table>At December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022,<span class=\"_ _4\"></span> property<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> p<span class=\"_ _4\"></span>lant and equipment with an original cost of 2.5 million euro (2021: 3<span class=\"_ _1\"></span>.4 million euro) that<span class=\"_ _1a9\"> </span> has already been fully depr<span class=\"_ _4\"></span>eciated is still in use. No pr<span class=\"_ _4\"></span>operty<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> plant and equipment is p<span class=\"_ _4\"></span>ledged or in limited use<span class=\"_ _1a9\"> </span>5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _2f\"> </span>2<span class=\"_ _2f\"></span> <span class=\"_ _14f\"> </span><span class=\"ls18 ws95\">Leases<span class=\"_ _1a9\"> </span></span><table class=\"s w2bd h5e\" id=\"_5d61891d-822c-49e5-ad32-50175bf5d557\"><tr><td class=\"t m1 x12d h12 y643 ff3 fsb fc7 sc0 ls1b ws0\">IN \u2018000 EURO<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x39e h12 y644 ff3 fsb fc7 sc0 ls1b ws0\">LAND AND </td><td class=\"t m1 x39f h12 y644 ff3 fsb fc7 sc0 ls1b ws0\">PROPERTY<span class=\"_ _1\"></span>, PLANT </td><td class=\"t m1 x3a0 h12 y643 ff3 fsb fc7 sc0 ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td class=\"t m1 x3a1 h12 y645 ff3 fsb fc7 sc0 ls1b wsbe\">BUILDINGS<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x3a2 h12 y645 ff3 fsb fc7 sc0 ls1b ws0\">AND EQUIPMENT<span class=\"_ _1a9\"> </span></td><td></td></tr><tr><td class=\"t m0 x12d h14 y646 ff2 fsd fc7 sc0 ls0 ws0\">Right-of-use assets<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y647 w2be h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">As at January 1,<span class=\"_ _4\"></span> 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3a3 y647 w2bf h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">817<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3a4 y647 w2c0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">252<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3a5 y647 w2c1 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,069<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y648 w2c2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Additions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3a6 y648 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3a7 y648 w298 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">34<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3a8 y648 w298 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">34<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y649 w2c3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Amortization<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3a9 y649 w223 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-466<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3aa y649 w274 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-134<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3ab y649 w2c4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-600<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y64a w2c5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Modification*<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3ac y64a w2c6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-251<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3ad y64a w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x334 y64a w2c7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-251<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y64b w2c8 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">As at December 31<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3ae y64b w2c9 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">100<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3af y64b w2ca h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">152<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3b0 y64b w2cb h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">252<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y64c w2cc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">As at January 1,<span class=\"_ _4\"></span> 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3b1 y64c w2cd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">100<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3b2 y64c w2ce h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">152<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3b3 y64c wc8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">252<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y64d w2c2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Additions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3b4 y64d w2cf h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">9<span class=\"_ _3\"></span>24<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3b5 y64d w11e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls43 ws228\">77<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3b6 y64d w190 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,001<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y64e w2c3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Amortization<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3b7 y64e wdb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-171<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3b8 y64e w2d0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-119<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3b9 y64e w201 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-290<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y64f w2d1 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Modification<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3ba y64f w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3bb y64f w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3bc y64f w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y650 w2d2 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">As at December 31<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3bd y650 w2d3 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">853<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3be y650 w2d4 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">110<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3bf y650 w238 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">963<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y651 ff2 fsd fc7 sc0 ls0 ws0\">Lease liabilities<span class=\"_ _155\"> </span> <span class=\"_ _88\"> </span> <span class=\"_ _148\"> </span> </td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y652 w2d5 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">As at January 1,<span class=\"_ _4\"></span> 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3c0 y652 w2d6 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">842<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3c1 y652 w2d7 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">254<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3c2 y652 w2d8 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,096<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y653 w2c2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Additions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3a6 y653 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3a7 y653 w298 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">34<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3a8 y653 w298 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">34<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y654 w2d9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Lease payments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3c3 y654 w2da h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-463<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3c4 y654 w213 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-136<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3c5 y654 w146 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-599<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y655 w2c5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Modification*<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3c6 y655 w215 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-266<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3ad y655 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3c7 y655 w223 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-266<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y656 w2c8 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">As at December 31<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3c8 y656 w2db h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">113<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3c9 y656 w2dc h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">152<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3ca y656 w2dd h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">265<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y657 ff1 fsc fc7 sc0 ls0 ws0\">Of which are:<span class=\"_ _113\"> </span> <span class=\"_ _150\"> </span> <span class=\"_ _84\"> </span> </td><td></td><td></td><td></td></tr><tr><td class=\"c n x3cb y658 w2de h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">current lease liabilities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3cc y658 w64 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">113<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3cd y658 w2df h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">108<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3ce y658 w175 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">221<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x3cb y659 w2e0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">non-current lease liabilities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3cf y659 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3d0 y659 wff h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">44<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3d1 y659 wff h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">44<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x3d2 y65a w2e1 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">total<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3d3 y65a w2e2 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">113<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3d4 y65a w2e3 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">152<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3d5 y65a w2e4 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">265<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y65b w2e5 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">As at January 1,<span class=\"_ _1\"></span> 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3d6 y65b w2e2 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">113<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3d7 y65b w2e3 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">152<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3d8 y65b w2e4 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">265<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y65c w2c2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Additions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3b4 y65c w2cf h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">9<span class=\"_ _3\"></span>24<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3b5 y65c w11e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls43 ws228\">77<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3b6 y65c w190 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,001<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y65d w2d9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Lease payments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3d9 y65d w257 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-172<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3aa y65d w2e6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-122<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3da y65d w145 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-294<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y65e w2d1 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Modification<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3ba y65e w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3bb y65e w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3bc y65e w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y65f w2d2 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">As at December 31<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3bd y65f w2e7 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">865<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3db y65f w2e8 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">107<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3dc y65f w2e9 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">972<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y660 ff2 fsd fc7 sc0 ls0 ws0\">Of which are:<span class=\"_ _8b\"> </span> <span class=\"_ _88\"> </span> <span class=\"_ _148\"> </span> </td><td></td><td></td><td></td></tr><tr><td class=\"c n x3cb y661 w2de h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">current lease liabilities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3dd y661 w2ea h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">92<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3de y661 w2eb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">47<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3df y661 wad h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">139<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x3cb y662 w2e0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">non-current lease liabilities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3e0 y662 w2ec h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _3\"></span>73<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3e1 y662 w65 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">60<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3e2 y662 wfe h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">833<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x3d2 y515 w2e1 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">total<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3e3 y515 w2ed h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">865<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3e4 y515 w2ee h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">107<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3e5 y515 w2ef h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">972<span class=\"_ _1a9\"> </span></div></td></tr></table>(*) Oxurion decided to focus on its clinical development strategy and decided to terminate part of the lease agreement with Bio-Incubator<span class=\"_ _1a9\"> </span>The lease payments in the table abo<span class=\"_ _4\"></span>ve of 0<span class=\"_ _1\"></span>.294 million euro (2021: 0<span class=\"_ _1\"></span>.599 million euro) are r<span class=\"_ _4\"></span>econciled to the line item \u2018Principal paid on lease liabilities<span class=\"_ _4\"></span>\u2019 in the consolidated statement of cash flows<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The amortization of the right-of-use assets is reconciled to the line item \u2018<span class=\"_ _0\"></span>Amor<span class=\"_ _3\"></span>tization of right-of-use assets\u2019 in the consolidated statement of cash flo<span class=\"_ _4\"></span>ws.<span class=\"_ _1a9\"> </span>On December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> Oxurion had outstanding lease obligations,<span class=\"_ _1\"></span> which become due as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span><table class=\"s w2f0 h5f\" id=\"_195e95a3-e07a-47f7-9e46-4769cb8e6f32\"><tr><td></td><td class=\"t m1 x3e6 h12 y663 ff3 fsb fc7 sc0 ls1b ws0\">UP TO 3 </td><td class=\"t m1 x3e7 h12 y664 ff3 fsb fc7 sc0 ls1b wsbe\">BETWEEN </td><td class=\"t m1 x3e8 h12 y664 ff3 fsb fc7 sc0 ls1b wsbe\">BETWEEN </td><td class=\"t m1 x3e9 h12 y664 ff3 fsb fc7 sc0 ls1b wsbe\">BETWEEN </td><td class=\"t m1 x3ea h12 y663 ff3 fsb fc7 sc0 ls1b ws0\">OVER 5 </td></tr><tr><td class=\"t m1 x34d h12 y665 ff3 fsb fc7 sc0 ls1b ws0\">IN \u2018000 EURO<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x3eb h12 y666 ff3 fsb fc7 sc0 ls1b wsbe\">MONTHS<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x3ec h12 y665 ff3 fsb fc7 sc0 ls1b ws0\">3 AND 12 </td><td class=\"t m1 x3ed h12 y665 ff3 fsb fc7 sc0 ls1b ws0\">1 AND 2 </td><td class=\"t m1 x3ee h12 y665 ff3 fsb fc7 sc0 ls1b ws0\">2 AND 5 </td><td class=\"t m1 x3ef h12 y666 ff3 fsb fc7 sc0 ls1b wsbe\">YEARS<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td></td><td class=\"t m1 x3f0 h12 y667 ff3 fsb fc7 sc0 ls1b wsbe\">MONTHS<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x3f1 h12 y667 ff3 fsb fc7 sc0 ls1b wsbe\">YEAR(S)<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x3f2 h12 y667 ff3 fsb fc7 sc0 ls1b wsbe\">YEARS<span class=\"_ _1a9\"> </span></td><td></td></tr><tr><td class=\"c n xf0 y515 w2f1 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Lease obligations<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3f3 y515 w11d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">39<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3f4 y515 w2f2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">100<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3f5 y515 w2f3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">121<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3f6 y515 wfe h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">338<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3f7 y515 w38 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls3f ws223\">3<span class=\"_ _23\"></span>74<span class=\"_ _1a9\"> </span></div></td></tr></table>5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _2f\"> </span>3<span class=\"_ _27\"></span> <span class=\"_ _159\"> </span><span class=\"ls11 ws27\">Intangi<span class=\"_ _4\"></span>ble assets<span class=\"_ _1a9\"> </span></span><table class=\"s w2f4 h60\" id=\"_43c7a8e1-52a1-4758-9860-dd5cf4b40ee3\"><tr><td></td><td class=\"t m1 x3f8 h12 y668 ff3 fsb fc7 sc0 ls1b wsbe\" colspan=\"2\">INTERNALL<span class=\"_ _1\"></span>Y </td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"t m1 x12d h12 y669 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x3f8 h12 y66a ff3 fsb fc7 sc0 ls1b wsbe\">GENERA<span class=\"_ _1\"></span>TED<span class=\"_ _3\"></span> </td><td class=\"c n x3f9 y66b w2f5 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">LICENSE NUVUE<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3fa y66b w2f6 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">LICENSE GRIFOLS<span class=\"_ _1a9\"> </span></div></td><td class=\"t m1 x3fb h12 y66a ff3 fsb fc7 sc0 ls1b wsbe\">LICENSE<span class=\"ls0 ws0\"> </span></td><td class=\"c n x3fc y66b w2f7 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">LICENSE VIB<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3fd y66b w2f8 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">LICENSES OTHER<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x3fe y66b w1c3 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _1a9\"> </span></div></td></tr><tr><td></td><td class=\"t m1 x3ff h12 y66c ff3 fsb fc7 sc0 ls1b wsbe\">MICROPLASMIN </td><td></td><td></td><td class=\"t m1 x400 h12 y66c ff3 fsb fc7 sc0 ls1b wsbe\">GALAP<span class=\"_ _4\"></span>A<span class=\"_ _4\"></span>GOS<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td></td><td class=\"t m1 x401 h12 y66d ff3 fsb fc7 sc0 ls1b ws0\">PHASE III<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"t m0 x12d h14 y66e ff2 fsd fc7 sc0 ls0 ws0\">As at 1 January 2021<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y66f w2f9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Cost<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x402 y66f w2fa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">53<span class=\"_ _4\"></span>,597<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x403 y66f w290 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">12,019<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x404 y66f w2fb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">9<span class=\"_ _4\"></span>,935<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x405 y66f w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x406 y66f w2fc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,252<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x407 y66f wdb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">168<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x408 y66f w2fd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">77<span class=\"_ _1\"></span>,971<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y670 w2fe h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Accumulated amortization expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x409 y670 w2ff h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-22,700<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40a y670 w300 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-6,578<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40b y670 w301 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,381<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40c y670 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40d y670 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40e y670 w302 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-168<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40f y670 wf4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-34,827<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y671 w303 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Accumulated impairment losses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x410 y671 w304 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-30<span class=\"_ _1\"></span>,897<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x411 y671 w305 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,441<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x412 y671 w306 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-4<span class=\"_ _4\"></span>,554<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x413 y671 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x414 y671 w2c7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-125<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x415 y671 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x416 y671 w307 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-4<span class=\"_ _1\"></span>1,017<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y672 w308 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Net carrying amount<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x417 y672 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x418 y672 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x419 y672 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x41a y672 wca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,000<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x41b y672 w309 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,127<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x41c y672 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x41d y672 w30a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,127<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y673 ff2 fsd fc7 sc0 ls0 ws0\">Y<span class=\"_ _1\"></span>ear ended December 31,<span class=\"_ _4\"></span> 2021<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y674 w2c2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Additions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x41e y674 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x41f y674 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x420 y674 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x421 y674 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x422 y674 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x423 y674 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x424 y674 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y675 w30b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Disposals<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x425 y675 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x426 y675 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x427 y675 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x428 y675 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x429 y675 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x42a y675 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x42b y675 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y676 w30c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Amortization expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x42c y676 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x42d y676 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x42e y676 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x42f y676 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x430 y676 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x431 y676 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x432 y676 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y677 w89 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Impairment losses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x41e y677 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x41f y677 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x420 y677 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x421 y677 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x433 y677 w30d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1,127<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x434 y677 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x435 y677 w30e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,127<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y678 w308 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Net carrying amount<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x417 y678 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x418 y678 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x419 y678 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x41a y678 wca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,000<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x436 y678 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x437 y678 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x438 y678 w30f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,000<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y679 ff2 fsd fc7 sc0 ls0 ws0\">As at December 31<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y67a w2f9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Cost<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x402 y67a w2fa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">53<span class=\"_ _4\"></span>,597<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x403 y67a w290 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">12,019<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x404 y67a w2fb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">9<span class=\"_ _4\"></span>,935<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x405 y67a w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x406 y67a w2fc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,252<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x407 y67a wdb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">168<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x408 y67a w2fd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">77<span class=\"_ _1\"></span>,971<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y67b w2fe h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Accumulated amortization expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x409 y67b w2ff h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-22,700<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40a y67b w300 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-6,578<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40b y67b w301 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,381<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40c y67b wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40d y67b wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40e y67b w302 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-168<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40f y67b wf4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-34,827<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y67c w303 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Accumulated impairment losses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x410 y67c w304 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-30<span class=\"_ _1\"></span>,897<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x411 y67c w305 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,441<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x412 y67c w306 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-4<span class=\"_ _4\"></span>,554<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x413 y67c w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x439 y67c w310 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1,252<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x431 y67c w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x43a y67c w311 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-42,144<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y67d w308 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Net carrying amount<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x417 y67d w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x418 y67d wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x419 y67d w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x41a y67d wca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,000<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x436 y67d w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x437 y67d w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x438 y67d w30f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,000<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y67e ff2 fsd fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>or the period ended on December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y67f w2c2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Additions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x41e y67f w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x41f y67f w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x420 y67f w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x421 y67f w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x422 y67f w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x423 y67f w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x424 y67f wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y680 w30b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Disposals<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x425 y680 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x426 y680 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x427 y680 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x428 y680 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x429 y680 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x42a y680 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x42b y680 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y681 w30c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Amortization expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x42c y681 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x42d y681 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x42e y681 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x42f y681 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x430 y681 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x431 y681 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x432 y681 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y682 w89 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Impairment losses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x41e y682 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x41f y682 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x420 y682 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x43b y682 w312 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1,000<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x43c y682 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x43d y682 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x43e y682 w313 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y683 w308 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Net carrying amount<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x417 y683 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x418 y683 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x419 y683 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x43f y683 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x440 y683 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x441 y683 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x442 y683 w314 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y684 ff2 fsd fc7 sc0 ls0 ws0\">As at December 31<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y685 w2f9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Cost<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x402 y685 w2fa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">53<span class=\"_ _4\"></span>,597<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x403 y685 w290 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">12,019<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x404 y685 w2fb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">9<span class=\"_ _4\"></span>,935<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x405 y685 w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x406 y685 w2fc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,252<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x407 y685 wdb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">168<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x408 y685 w2fd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">77<span class=\"_ _1\"></span>,971<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y686 w2fe h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Accumulated amortization expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x409 y686 w2ff h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-22,700<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40a y686 w300 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-6,578<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40b y686 w301 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,381<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40c y686 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40d y686 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40e y686 w302 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-168<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x40f y686 wf4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-34,827<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y687 w303 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Accumulated impairment losses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x410 y687 w304 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-30<span class=\"_ _1\"></span>,897<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x411 y687 w305 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,441<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x412 y687 w306 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-4<span class=\"_ _4\"></span>,554<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x443 y687 w315 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1,000<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x444 y687 w316 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,252<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x445 y687 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x446 y687 w317 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-43<span class=\"_ _4\"></span>,144<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y688 w308 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Net carrying amount<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x417 y688 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x418 y688 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x419 y688 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x43f y688 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x440 y688 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x441 y688 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x442 y688 w314 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x447 h25 y689 ff9 fs3 fc7 sc0 ls0 ws0\">Intangible assets with definite useful lives:<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td><td></td><td></td></tr></table>In the development of JETREA\u00ae,<span class=\"_ _4\"></span> Oxurion has capital<span class=\"_ _4\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ized ocriplasmin clinical trial costs (internall<span class=\"_ _4\"></span>y generated<span class=\"_ _1a9\"> </span> Microplasmin Phase 3)<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> and two externally acquir<span class=\"_ _4\"></span>ed<span class=\"_ _1a9\"> </span> licenses that wer<span class=\"_ _4\"></span>e used for development of JETREA\u00ae:<span class=\"_ _1a9\"> </span> NuV<span class=\"_ _4\"></span>ue and Grifols<span class=\"_ _4\"></span>. The capitalized costs w<span class=\"_ _4\"></span>ere amortized<span class=\"_ _1a9\"> </span> from the date of commercialization of JETREA\u00ae in 2013<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> over the life of the patent,<span class=\"_ _1\"></span> which was determined to be<span class=\"_ _1a9\"> </span> 11<span class=\"_ _4\"></span>.8 y<span class=\"_ _4\"></span>ears,<span class=\"_ _1\"></span> but as there was an impairment indicator<span class=\"_ _25\"></span>, they<span class=\"_ _1a9\"> </span> wer<span class=\"_ _4\"></span>e fully impaired befor<span class=\"_ _4\"></span>e that date. W<span class=\"_ _1\"></span>e refer to the ac<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>counting policy section for more details on ocrip<span class=\"_ _4\"></span>lasmin.<span class=\"_ _1a9\"> </span>Intangible assets p<span class=\"_ _4\"></span>ledged:<span class=\"_ _1a9\"> </span>In the context of the Kreos/P<span class=\"_ _4\"></span>ontifax convertible bond<span class=\"_ _1\"></span>, the<span class=\"_ _1a9\"> </span> Group has created a p<span class=\"_ _4\"></span>ledge up to 10 million euro over (i)<span class=\"_ _1a9\"> </span> the Company\u2019<span class=\"_ _1\"></span>s business<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> including its intellectual pr<span class=\"_ _4\"></span>operty<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> and (ii) the patents and patent application in families<span class=\"_ _1a9\"> </span> WO2020043533 and WO2005123734<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> r<span class=\"_ _4\"></span>elating to THR<span class=\"_ _1a9\"> </span> 687<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> which have been registered in the Belg<span class=\"_ _4\"></span>ian national<span class=\"_ _1a9\"> </span> pledge reg<span class=\"_ _4\"></span>ister<span class=\"_ _1\"></span>. In addition,<span class=\"_ _4\"></span> a pledge is r<span class=\"_ _4\"></span>egistered o<span class=\"_ _4\"></span>ver the<span class=\"_ _1a9\"> </span> US patent 10<span class=\"_ _1\"></span>,703<span class=\"_ _1\"></span>,752 (application 16/554,259 fi<span class=\"_ _4\"></span>led on<span class=\"_ _1a9\"> </span> August 19<span class=\"_ _25\"></span>, 2019)<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> relating to THR 687<span class=\"_ _0\"></span>, in the United States<span class=\"_ _1a9\"> </span> Patent and T<span class=\"_ _25\"></span>rademark Office<span class=\"_ _1a9\"> </span>Intangible assets with indefinite useful lives:<span class=\"_ _1a9\"> </span>The Galapagos License r<span class=\"_ _4\"></span>elates to an externally acquired license by Oxurion in r<span class=\"_ _4\"></span>elation to program THR-687<span class=\"_ _0\"></span>,<span class=\"_ _4\"></span> for the development and commercialization of integrin antago<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>nists. T<span class=\"_ _4\"></span>he Part A data show<span class=\"_ _4\"></span>ed THR-687<span class=\"_ _1\"></span> to be safe and well toler<span class=\"_ _4\"></span>ated with no serious adverse events and none of the patients required r<span class=\"_ _4\"></span>escue medication through Month 3<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> how<span class=\"_ _4\"></span>ever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> there w<span class=\"_ _4\"></span>as insufficient evidence of efficacy on the key endpoints (Best Corrected Visual A<span class=\"_ _4\"></span>cuity and Central Subfield Thic<span class=\"_ _4\"></span>kness)<span class=\"_ _4\"></span>. As a result,<span class=\"_ _1\"></span> Oxurion has decided not to advance THR-687<span class=\"_ _4\"></span> to P<span class=\"_ _4\"></span>art B of the INTEGRAL trial. The Galapagos License was ther<span class=\"_ _4\"></span>e for fully impaired as per December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022. F<span class=\"_ _1\"></span>or more details on the agreement and accounting policy treatment,<span class=\"_ _1\"></span> we refer to note 5<span class=\"_ _1\"></span>.8 under key arrangements section.<span class=\"_ _1a9\"> </span>The VIB license relates to an externall<span class=\"_ _4\"></span>y acquired license by Oncurious for a portfolio of five unique next generation immuno-oncology assets which are being used in further development. This asset w<span class=\"_ _4\"></span>as given as a contribution in kind by VIB and w<span class=\"_ _4\"></span>as capitalized based on fair value deter<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mined by an independent valuator<span class=\"_ _1\"></span>. The license is impair<span class=\"_ _4\"></span>ed as per June 30<span class=\"_ _25\"></span>, 2021<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> as Oxurion would no longer make direct investments in these assets<span class=\"_ _4\"></span>. The Compan<span class=\"_ _4\"></span>y also explored the option of taking on an ad<span class=\"_ _4\"></span>ditional investor in Oncurious,<span class=\"_ _1\"></span> but was unable to secur<span class=\"_ _4\"></span>e a transaction under acceptable terms<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or more details on the agreement and accounting policy treatment,<span class=\"_ _1\"></span> refer to note 5<span class=\"_ _1\"></span>.8 under key arrangements section. Besides the portfolio of five immu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>no-oncolog<span class=\"_ _3\"></span>y assets the VIB License column also contains TB-403 with a gross book value of 0<span class=\"_ _25\"></span>.125 million euro,<span class=\"_ _1\"></span> which w<span class=\"_ _4\"></span>as impaired during 2020<span class=\"_ _1\"></span>. Impairment test at December 31<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022<span class=\"_ _1a9\"> </span>Indefinite life intangible assets ar<span class=\"_ _4\"></span>e tested for impairment annually since these are not subject to amortization. Definite lived intangible assets ar<span class=\"_ _4\"></span>e tested for impairment if indicators exist. The Galapagos license w<span class=\"_ _4\"></span>as fully impaired (1 million euro) given the announcement in the first half of 2022 that Oxurion has decided not to advance THR-687<span class=\"_ _4\"></span> to part B of the INTEGRAL trial.<span class=\"_ _1a9\"> </span>The VIB IP license has been fully impair<span class=\"_ _4\"></span>ed as per June 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _1\"></span>, as <span class=\"_ _4\"></span>a result of the existence of an impairment indicator given the announcement in the first half of 2021 that Oxurion would no longer make dir<span class=\"_ _4\"></span>ect investments in Oncurious (oncolog<span class=\"_ _3\"></span>y)<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> and as a result the oncolog<span class=\"_ _3\"></span>y assets wer<span class=\"_ _4\"></span>e impaired in the amount of 1<span class=\"_ _1\"></span>.127 million euro<span class=\"_ _1a9\"> </span><span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _27\"></span>4<span class=\"_ _2f\"></span> <span class=\"_ _159\"> </span><span class=\"ls0 ws0\">T<span class=\"_ _25\"></span>rade and oth<span class=\"_ _4\"></span>er recei<span class=\"_ _4\"></span>vabl<span class=\"_ _4\"></span>es, non-<span class=\"_ _1a9\"> </span></span>curr<span class=\"_ _4\"></span>ent tax c<span class=\"_ _4\"></span>redit and c<span class=\"_ _4\"></span>urren<span class=\"_ _4\"></span>t tax receivabl<span class=\"_ _4\"></span>es 5.7<span class=\"_ _25\"></span>.4.1 <span class=\"_ _7f\"> </span>T<span class=\"_ _1\"></span>rade and other receivables<span class=\"_ _1a9\"> </span><table class=\"s w318 h58\" id=\"_b803bed3-43f1-4a5e-b699-6a545be9b69c\"><tr><td class=\"c n xf0 y607 w319 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x121 y607 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x448 y607 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w31a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>rade receivables<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x449 y56a w31b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">316<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44a y56a w31c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">81<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w31d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other receivables<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44b y56b w31e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,696<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44c y56b w31f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,276<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w320 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Prepaid expenses and other current assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44d y5ba w321 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">309<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44e y5ba w322 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">160<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44f y515 w323 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,321<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x450 y515 w324 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">2,517<span class=\"_ _1a9\"> </span></div></td></tr></table>Other receivables r<span class=\"_ _4\"></span>elate mainly to prepayments: 2.376 million euro in 2022,<span class=\"_ _1\"></span> compared to 2.228 million euro in 2021<span class=\"_ _4\"></span>. These ad<span class=\"_ _4\"></span>vances wer<span class=\"_ _4\"></span>e paid upfront to various CRO partners mainly in relation to direct costs and pass-through costs.<span class=\"_ _1a9\"> </span>Allow<span class=\"_ _4\"></span>ance for bad debt is booked on the basis of an estimate of lifetime credit losses at eac<span class=\"_ _4\"></span>h reporting, taking into account the payment histor<span class=\"_ _3\"></span>y of the other par<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>. As per December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> and 2021<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> there are no material aged trade receivab<span class=\"_ _4\"></span>les.<span class=\"_ _1a9\"> </span>The table belo<span class=\"_ _4\"></span>w sho<span class=\"_ _4\"></span>ws the evolution of key trade r<span class=\"_ _4\"></span>eceiv<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>able amounts on the reporting date:<span class=\"_ _1a9\"> </span>IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _8\"> </span><span class=\"wsbe\">2022<span class=\"_ _36\"> </span>2021<span class=\"_ _1a9\"> </span></span>Eumedica<span class=\"_ _15f\"> </span>90<span class=\"_ _16\"> </span>25<span class=\"_ _1a9\"> </span>Inceptua Group<span class=\"_ _131\"> </span>85<span class=\"_ _3f\"> </span>56<span class=\"_ _1a9\"> </span>VIB<span class=\"_ _160\"> </span>119<span class=\"_ _7b\"> </span>0<span class=\"_ _1a9\"> </span>Other trade receivables<span class=\"_ _20\"> </span>22<span class=\"_ _7b\"> </span>0<span class=\"_ _1a9\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _161\"> </span><span class=\"ls41 ws225\">316<span class=\"_ _105\"> </span></span>81<span class=\"_ _1a9\"> </span>Management has sufficient confidence in the creditw<span class=\"_ _4\"></span>orthi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ness of the counterparty that the trade receivable amounts are considered co<span class=\"_ _4\"></span>llectable in full. Aging balance of receivab<span class=\"_ _4\"></span>les that are due<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> but that ar<span class=\"_ _4\"></span>e still considered collectab<span class=\"_ _4\"></span>le based on contractual payment terms:<span class=\"_ _1a9\"> </span><table class=\"s w325 h61\" id=\"_16ca18ee-3aaa-45a6-abe2-9842177a1c5c\"><tr><td class=\"c n xf0 y68a w60 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x451 y68a w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x452 y68a w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y68b w326 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0 - 60 days<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x453 y68b w31b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">316<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x454 y68b w67 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">81<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y68c w327 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">60 - 90 days<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x455 y68c w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x456 y68c w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y68d ff1 fsc fc7 sc0 ls0 ws0\">90 - 120 days<span class=\"_ _1a9\"> </span></td><td class=\"c n x457 y68e w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x458 y68e w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y68f w328 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">more than 120 days<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x459 y68f w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45a y68f w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45b y515 w329 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls41 ws225\">316<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45c y515 w32a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">81<span class=\"_ _1a9\"> </span></div></td></tr></table>When determining the collectability of a trade r<span class=\"_ _4\"></span>eceivable<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the Group takes into account any c<span class=\"_ _4\"></span>hange in the quality of the receivable betw<span class=\"_ _4\"></span>een the date on which the cr<span class=\"_ _4\"></span>edit was granted and the reporting date.<span class=\"_ _1a9\"> </span>The Group has no securities linked to these r<span class=\"_ _4\"></span>eceivables<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.7<span class=\"_ _25\"></span>.4.2 <span class=\"_ _5e\"> </span>T<span class=\"_ _1\"></span>axes<span class=\"_ _1a9\"> </span>Non-current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _1a9\"> </span><table class=\"s w32b h55\" id=\"_169d7040-5c5b-4c96-89d4-013e133d7d7e\"><tr><td class=\"c n xf0 y5fc w60 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45d y5fc w32c h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45e y5fc w1b7 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w32d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax credit<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45f y5ba w32e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3,785<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x460 y5ba w32f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,000<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x461 y515 w330 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,785<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x462 y515 w331 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">4,000<span class=\"_ _1a9\"> </span></div></td></tr></table>Oxurion receives tax credits f<span class=\"_ _4\"></span>or R&amp;D expenses. In case in<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>sufficient tax against which to set off the tax credit,<span class=\"_ _1\"></span> the credit can be carried for<span class=\"_ _3\"></span>ward during five consecutive fiscal y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>. At the end of these five fiscal y<span class=\"_ _4\"></span>ears,<span class=\"_ _1\"></span> the balance of the unused tax credit is r<span class=\"_ _4\"></span>eceived in cash from the government.<span class=\"_ _1a9\"> </span>Current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _1a9\"> </span><table class=\"s w332 h62\" id=\"_dbad26ad-1a41-4f7b-b8d9-6d8a87218443\"><tr><td class=\"c n xf0 y690 w319 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x451 y690 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x463 y690 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y691 w333 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Recoverable V<span class=\"_ _1\"></span>A<span class=\"_ _1\"></span>T<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x464 y691 w334 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">154<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x465 y691 w335 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">24<span class=\"_ _3\"></span>2<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f9 w336 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Recoverable withho<span class=\"_ _4\"></span>lding tax<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x466 y5f9 w337 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x467 y5f9 w338 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y692 w339 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax credit<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x468 y692 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x469 y692 w92 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">568<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w33a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other taxes<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46a y5ba w33b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">33<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46b y5ba w33c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">31<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46c y515 w33d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">189<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46d y515 w33e h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">845<span class=\"_ _1a9\"> </span></div></td></tr></table>The outstanding tax claims r<span class=\"_ _4\"></span>elate to reco<span class=\"_ _4\"></span>verable V<span class=\"_ _25\"></span>A<span class=\"_ _25\"></span>T<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> re<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cover<span class=\"_ _4\"></span>able withholding tax on interest,<span class=\"_ _1\"></span> US corporate income tax and short-term tax credit<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _2f\"></span>5<span class=\"_ _27\"></span> <span class=\"_ _14f\"> </span><span class=\"ls17 ws92\">I<span class=\"_ _3\"></span>nventori<span class=\"_ _3\"></span>es<span class=\"_ _1a9\"> </span></span><table class=\"s w33f h63\" id=\"_75674640-b05e-46e1-81d3-f2a99d5be31c\"><tr><td class=\"c n x129 y693 w340 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">N '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x121 y693 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x448 y693 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x34d h13 y694 ff1 fsc fc7 sc0 ls0 ws0\">Raw and ancillary materials, goods in process and </td><td class=\"c n x46e y695 wd5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">5<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46f y695 w341 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">60<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x34d h13 y696 ff1 fsc fc7 sc0 ls0 ws0\">finished goods<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x470 y515 w342 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">5<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x471 y515 w343 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">60<span class=\"_ _1a9\"> </span></div></td></tr></table>The inventories of r<span class=\"_ _4\"></span>aw and ancillary materials,<span class=\"_ _4\"></span> goods in process and finished goods are based on the net value<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> after impairment losses. T<span class=\"_ _4\"></span>he impairment losses on the inventories recognized in cost of g<span class=\"_ _4\"></span>oods amount to 0<span class=\"_ _1\"></span>.444 million euro in 2022,<span class=\"_ _4\"></span> compar<span class=\"_ _4\"></span>ed to 0<span class=\"_ _1\"></span>.629 million euro in 2021<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _27\"></span>6<span class=\"_ _2f\"> </span> <span class=\"_ _14f\"> </span><span class=\"ls17 ws92\">Inves<span class=\"_ _3\"></span>tment<span class=\"_ _3\"></span>s<span class=\"_ _1a9\"> </span></span><table class=\"s w344 h55\" id=\"_6b0a05b8-8a4f-496e-a83f-ce76badc8de6\"><tr><td class=\"c n xf0 y5fc w60 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x472 y5fc w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x473 y5fc w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w345 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other investments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x474 y5ba w4a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">95<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x475 y5ba w346 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">24<span class=\"_ _3\"></span>7<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w347 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal investments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x476 y515 w253 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">95<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x477 y515 w348 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls15 ws5b\">24<span class=\"_ _3\"></span>7<span class=\"_ _1a9\"> </span></div></td></tr></table><table class=\"s w349 h64\" id=\"_5c500f8c-3ad8-4068-bfd5-4f88828511bf\"><tr><td class=\"t m1 x12d h12 y697 ff3 fsb fc7 sc0 ls1b ws0\">FINANCE ASSETS ACCORDING T<span class=\"_ _4\"></span>O CA<span class=\"_ _1\"></span>TEGORIES </td><td class=\"t m1 x478 h12 y697 ff3 fsb fc7 sc0 ls1b ws0\">INVESTMENTS A<span class=\"_ _1\"></span>T </td><td class=\"t m1 x479 h12 y697 ff3 fsb fc7 sc0 ls1b wsbe\">INVESTMENTS </td></tr><tr><td class=\"t m1 x12d h12 y698 ff3 fsb fc7 sc0 ls1b ws0\">DEFINED IN IFRS 9<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x3a2 h12 y698 ff3 fsb fc7 sc0 ls1b ws0\">AMORTIZED COS<span class=\"_ _4\"></span>T<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x47a h12 y698 ff3 fsb fc7 sc0 ls1b ws0\">A<span class=\"_ _1\"></span>T FVOCI<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y699 w34a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">Balance at 1 January 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x47b y699 w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x47c y699 w34b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">288<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y69a w34c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Exchange rate differences<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x47d y69a w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x47e y69a w297 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y69b w2c2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Additions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x47f y69b w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x480 y69b wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y69c w34d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Retirements<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x481 y69c w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x482 y69c w14e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-40<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y69d w34e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Impairments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x483 y69d w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x484 y69d w34f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y69e w350 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Appreciation at market value<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x485 y69e w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x486 y69e w351 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-7<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y69f w352 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">Balance at 31 December 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x487 y69f w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x488 y69f w348 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls15 ws5b\">24<span class=\"_ _3\"></span>7<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6a0 w353 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-/- of which taken in fixed assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x489 y6a0 w354 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48a y6a0 w354 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6a1 w355 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>aken in current assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48b y6a1 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48c y6a1 w356 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">247<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y6a2 ff2 fsd fc7 sc0 ls0 ws0\">Composition<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y6a3 w357 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- Other bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48d y6a3 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48e y6a3 w356 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">247<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6a4 w358 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- T<span class=\"_ _1\"></span>erm investments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48f y6a4 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x490 y6a4 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y6a5 ff2 fsd fc7 sc0 ls0 ws0\">Breakdown per curr<span class=\"_ _4\"></span>ency<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y6a6 w359 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- in euro<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x491 y6a6 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x492 y6a6 w35a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">140<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6a7 w35b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- in other currency<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x493 y6a7 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x494 y6a7 w35c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">107<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6a8 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x495 y6a8 w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x496 y6a8 w348 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls15 ws5b\">24<span class=\"_ _3\"></span>7<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6a9 w35d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">Balance at 1 January 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x497 y6a9 w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x498 y6a9 w348 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls15 ws5b\">24<span class=\"_ _3\"></span>7<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6aa w34c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Exchange rate differences<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x47d y6aa w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x499 y6aa w13e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">9<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6ab w2c2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Additions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x47f y6ab w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x480 y6ab wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6ac w34d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Retirements<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x481 y6ac w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x49a y6ac w2c6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-152<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6ad w34e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Impairments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x483 y6ad w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x49b y6ad w35e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-4<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6ae w350 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Appreciation at market value<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x485 y6ae w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x49c y6ae wb0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6af w35f h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">Balance at 31 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x49d y6af w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x49e y6af w253 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">95<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y6b0 ff1 fsc fc7 sc0 ls0 ws0\">-/- of which taken in fixed assets<span class=\"_ _1a9\"> </span></td><td class=\"c n x49f y6b1 w360 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a0 y6b1 w360 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f1 w355 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>aken in current assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48b y5f1 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a1 y5f1 w4a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">95<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y6b2 ff2 fsd fc7 sc0 ls0 ws0\">Composition<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y5f3 w357 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- Other bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48d y5f3 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a2 y5f3 w4a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">95<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y569 w358 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- T<span class=\"_ _1\"></span>erm investments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48f y569 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x490 y569 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y6b3 ff2 fsd fc7 sc0 ls0 ws0\">Breakdown per curr<span class=\"_ _4\"></span>ency<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y56b w359 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- in euro<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x491 y56b w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a3 y56b w4a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">95<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w35b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- in other currency<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x493 y5ba w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a4 y5ba w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x495 y515 w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a5 y515 w253 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">95<span class=\"_ _1a9\"> </span></div></td></tr></table>The Group decided to in<span class=\"_ _4\"></span>vest mainly in saving accounts and term deposits. T<span class=\"_ _4\"></span>he remaining bonds are held b<span class=\"_ _4\"></span>y KBC and are distributed in tw<span class=\"_ _4\"></span>o bonds of private and public insti<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tutions. T<span class=\"_ _4\"></span>he credit rating varies fr<span class=\"_ _4\"></span>om A+ to BBB<span class=\"_ _4\"></span>. Bonds are measured at fair value at level 1 hier<span class=\"_ _4\"></span>arch<span class=\"_ _4\"></span>y based on quoted market prices<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>5.7<span class=\"_ _25\"></span>.7 <span class=\"_ _58\"> </span><span class=\"ls10 ws14\">S<span class=\"_ _3\"></span>hare c<span class=\"_ _3\"></span>apital<span class=\"_ _1a9\"> </span></span>Oxurion was incorpor<span class=\"_ _4\"></span>ated on May 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2006<span class=\"_ _25\"></span>, under its former name \u2018ThromboGenics<span class=\"_ _1\"></span>\u2019,<span class=\"_ _4\"></span> with a share capital of 62,000 euro repr<span class=\"_ _4\"></span>esented by 11<span class=\"_ _1\"></span>,124 shares<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> the shar<span class=\"_ _4\"></span>e capital of the Company on a consolidated basis amounted to 65<span class=\"_ _1\"></span>.4 million euro represented b<span class=\"_ _4\"></span>y 4<span class=\"_ _1\"></span>11,071<span class=\"_ _1\"></span>,559 ordinar<span class=\"_ _3\"></span>y shares without indication of nominal value. All shar<span class=\"_ _4\"></span>es are fully paid up and have the same rights<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span><table class=\"s w36d h53\" id=\"_c4698786-cf45-4ed2-9ae4-fd6f1115c572\"><tr><td class=\"t m1 x34d h12 y6be ff3 fsb fc7 sc0 ls1b ws0\">NUMBER OF SHARES<span class=\"_ _16e\"> </span><span class=\"ls0\"> </span></td><td></td></tr><tr><td class=\"c n xf0 y6bf w364 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2020<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b3 y6bf w36e h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">38<span class=\"_ _4\"></span>,291<span class=\"_ _4\"></span>,950<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y569 w36f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Capital increase due to conversion of convertible bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b4 y569 w370 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _3\"></span>75<span class=\"_ _4\"></span>,334<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6c0 w367 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b5 y6c0 w371 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">39<span class=\"_ _1\"></span>,067<span class=\"_ _1\"></span>,284<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w368 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Capital increase by contribution in cash<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b6 y56b w372 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,226<span class=\"_ _1\"></span>,039<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w36f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Capital increase due to conversion of convertible bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b7 y5ba w373 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">364,778,236<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w36c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b8 y515 w374 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">411<span class=\"_ _4\"></span>,071<span class=\"_ _4\"></span>,559<span class=\"_ _1a9\"> </span></div></td></tr></table><table class=\"s w361 h65\" id=\"_a2f978a2-d1d3-4a5f-9c6e-6a3f1e6e6139\"><tr><td class=\"c n xf0 y6b4 w362 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a6 y6b4 w363 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">CAPIT<span class=\"_ _1\"></span>AL<span class=\"_ _1a9\"> </span></div></td><td class=\"t m1 x3ef h12 y6b5 ff3 fsb fc7 sc0 ls1b wsbe\">SHARE<span class=\"ls0 ws0\"> </span></td></tr><tr><td></td><td></td><td class=\"t m1 x4a7 h12 y6b6 ff3 fsb fc7 sc0 ls1b wsbe\">PREMIUM<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y6b7 w364 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2020<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a8 y6b7 w169 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">44,913<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a9 y6b7 w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c xf0 y6b8 w365 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Capital increase due to conversion of<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">convertible bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4aa y5f7 w17f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,116<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ab y5f7 w366 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">234<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6b9 w367 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ac y6b9 w18f h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">46<span class=\"_ _4\"></span>,029<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ad y6b9 w188 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">234<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6ba w368 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Capital increase by contribution in cash<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ae y6ba w369 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">10<span class=\"_ _4\"></span>,405<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x467 y6ba w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c xf0 y6bc w36a h66\"><div class=\"t m0 xca h28 y6bb ff1 fsd fc7 sc0 ls0 ws0\">Capital increase due to conversion of<span class=\"_ _1a9\"> </span></div><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">convertible bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4af y6bd w36b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">9<span class=\"_ _4\"></span>,009<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b0 y6bd w19f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">16<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w36c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b1 y515 w1ae h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">65<span class=\"_ _4\"></span>,443<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b2 y515 w1af h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">250<span class=\"_ _1a9\"> </span></div></td></tr></table>The Board of Dir<span class=\"_ _4\"></span>ectors<span class=\"_ _4\"></span>\u2019 po<span class=\"_ _4\"></span>wers with r<span class=\"_ _4\"></span>espect to the author<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ized share capital w<span class=\"_ _4\"></span>ere renew<span class=\"_ _4\"></span>ed at the EGM of Oxurion held on May 2<span class=\"_ _4\"></span>4<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _1\"></span> for a period of five years starting from the publication of the notary deed per<span class=\"_ _3\"></span>taining to<span class=\"_ _1a9\"> </span>t<span class=\"_ _1a9\"> </span>he modification of the Articles of Association in the Belgian Official Gazette (May 2<span class=\"_ _4\"></span>4<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022). T<span class=\"_ _4\"></span>he Board of Directors is authorized to incr<span class=\"_ _4\"></span>ease the share capital of the Company upon one or mor<span class=\"_ _4\"></span>e occasions up to an amount of 67<span class=\"_ _25\"></span>,93<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,161<span class=\"_ _1\"></span>.32 euro (less the authorized capital which is used in view of the issuance of convertible bonds) through contribution(s) in cash,<span class=\"_ _1\"></span> contribution(s) in kind<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> or b<span class=\"_ _4\"></span>y con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>version of the reserves in accordance with the special report drawn up pursuant to Article 7:199 of the BCCA. As a result,<span class=\"_ _1\"></span> on December 31<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022, the authorized capital is 65<span class=\"_ _1\"></span>,443<span class=\"_ _4\"></span>,000 euro<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>During financial year 2022,<span class=\"_ _1\"></span> Oxurion\u2019<span class=\"_ _1\"></span>s share capital and share premium has been incr<span class=\"_ _4\"></span>eased on several occasions follo<span class=\"_ _4\"></span>wing the conversion of (in aggregate) 3<span class=\"_ _1\"></span>,610 conver<span class=\"_ _3\"></span>ti<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ble bonds issued to Negma: <table class=\"s w375 h67\" id=\"_0aa36e6d-4502-4a0e-9419-9fd9cc06a4b9\"><tr><td class=\"c n xcb y6c1 w376 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls32 ws1f7\">D<span class=\"_ _3\"></span>AT<span class=\"_ _5\"> </span>E<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ba y6c1 w377 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">BONDS<span class=\"_ _1a9\"> </span></div></td><td class=\"t m1 x4bb h12 y6c2 ff3 fsb fc7 sc0 ls1b wsbe\">CAPIT<span class=\"_ _1\"></span>AL<span class=\"ls0 ws0\"> </span></td><td class=\"t m1 x4bc h12 y6c2 ff3 fsb fc7 sc0 ls1b ws0\">SHARE PREMIUM </td></tr><tr><td></td><td></td><td class=\"t m1 x4bb h12 y6c3 ff3 fsb fc7 sc0 ls1b ws0\"> (IN EURO)<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x4bc h12 y6c3 ff3 fsb fc7 sc0 ls1b ws0\">(IN EURO)<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xd1 y6c4 w1c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">8 F<span class=\"_ _4\"></span>ebruary 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4bd y6c4 w2c6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">200<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4be y6c4 w378 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">483,219<span class=\"_ _1\"></span>.36<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4bf y6c4 w379 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">16<span class=\"_ _1\"></span>,780<span class=\"_ _4\"></span>.64<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4c0 y6c5 w20 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">23 March 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c1 y6c5 w21 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">240<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c2 y6c5 w37a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">600<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c3 y6c5 w51 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4c4 y6c6 w24 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">15 April 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c5 y6c6 w37b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">230<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c6 y6c6 w37c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">575,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c7 y6c6 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4c4 y6c7 w27 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">18 May 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c8 y6c7 w2c7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">200<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c9 y6c7 w31 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">500<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ca y6c7 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xe1 y6c8 w29 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _4\"></span> June 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4cb y6c8 w37e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">180<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4cc y6c8 w37f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">450<span class=\"_ _4\"></span>,000<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4cd y6c8 w2c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xe5 y6c9 w2d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">6 July 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ce y6c9 w380 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">220<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4cf y6c9 w381 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">550<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d0 y6c9 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4c0 y6ca w30 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">17<span class=\"_ _4\"></span> August 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d1 y6ca w2c6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">200<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d2 y6ca w382 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">500<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d3 y6ca w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4d4 y6cb w33 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">5 September 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d5 y6cb w383 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">80<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d6 y6cb w384 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">200<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d7 y6cb w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6cc w36 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">13 September 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d5 y6cc w383 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">80<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d6 y6cc w384 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">200<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d7 y6cc w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xd1 y6cd w385 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">12 October 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d8 y6cd w386 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">173<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d9 y6cd w387 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">432,500<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4da y6cd w23 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xd1 y6ce w3a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">19 October 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4db y6ce w3b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">164<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4dc y6ce w388 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">410<span class=\"_ _1\"></span>,000.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4dd y6ce w389 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xfa y6cf w38a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">24 October 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4de y6cf w35a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">120<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4df y6cf w3f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">300<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e0 y6cf w2c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xfa y6d0 w38b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">26 October 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e1 y6d0 w181 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">123<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e2 y6d0 w38c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">307<span class=\"_ _25\"></span>,500.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e3 y6d0 w45 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4e4 y6d1 w38d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2 November 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e5 y6d1 w35a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">120<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e6 y6d1 w38e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">300<span class=\"_ _4\"></span>,000<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e7 y6d1 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4e8 y6d2 w46 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _4\"></span> November 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e9 y6d2 w38f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">130<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ea y6d2 w390 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">325<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4eb y6d2 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4d4 y6d3 w49 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">17<span class=\"_ _4\"></span> November 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ec y6d3 w4a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">56<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ed y6d3 w391 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">140<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ee y6d3 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6d4 w4c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">22 November 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ef y6d4 w392 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">172<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f0 y6d4 w393 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">430<span class=\"_ _4\"></span>,000<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f1 y6d4 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y65e w4f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">24 No<span class=\"_ _4\"></span>vember 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f2 y65e w35a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">140<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f3 y65e w394 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">350<span class=\"_ _1\"></span>,000<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f4 y65e w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6d5 w395 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">28 November 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f5 y6d5 w335 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">24<span class=\"_ _3\"></span>2<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f6 y6d5 w396 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">605<span class=\"_ _4\"></span>,000<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f7 y6d5 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6d6 w55 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">30 November 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f8 y6d6 w383 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">80<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f9 y6d6 w397 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">200,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4fa y6d6 w23 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4e4 y6d7 w398 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">5 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4fb y6d7 w383 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">80<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4fc y6d7 w35 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">200<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4fd y6d7 w23 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4e4 y6d8 w59 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">9 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4fe y6d8 w5a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">380<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4fc y6d8 w396 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">950<span class=\"_ _4\"></span>,000<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ff y6d8 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x500 h1d y6d9 ff2 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></td><td class=\"c n x501 y515 w399 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,610<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x502 y515 w39a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">9<span class=\"_ _4\"></span>,008<span class=\"_ _4\"></span>,219<span class=\"_ _1\"></span>.36<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x503 y515 w39b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">16<span class=\"_ _1\"></span>,780<span class=\"_ _4\"></span>.64<span class=\"_ _1a9\"> </span></div></td></tr></table>In addition to the Negma funding,<span class=\"_ _4\"></span> a capital increase also took place in the context of the authorized capital b<span class=\"_ _4\"></span>y a contribution in cash of 10<span class=\"_ _25\"></span>,405<span class=\"_ _4\"></span>,500 euro and with the issuance of 7<span class=\"_ _25\"></span>,226<span class=\"_ _1\"></span>,039 new Oxurion NV shares at 1<span class=\"_ _1\"></span>.44 euro per share through a private equity p<span class=\"_ _4\"></span>lacement on March 7<span class=\"_ _0\"></span>, 2022<span class=\"_ _1a9\"> </span>5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _2f\"></span>8<span class=\"_ _27\"></span> <span class=\"_ _14f\"> </span><span class=\"ls0 ws0\">O<span class=\"_ _3\"></span>ther c<span class=\"_ _4\"></span>omprehens<span class=\"_ _4\"></span>ive in<span class=\"_ _4\"></span>come and </span>other<span class=\"_ _3\"></span> reser<span class=\"_ _23\"></span>ves<span class=\"_ _1a9\"> </span>The other comprehensive income is detailed as f<span class=\"_ _4\"></span>ollows:<span class=\"_ _1a9\"> </span><table class=\"s w39c h68\" id=\"_1fd62ee4-4ab6-4ab4-8c0c-cdd35a1c3021\"><tr><td></td><td class=\"t m1 x504 h12 y6da ff3 fsb fc7 sc0 ls1b wsbe\">CURRENCY </td><td class=\"t m1 x505 h12 y6db ff3 fsb fc7 sc0 ls1b wsbe\">REMEASURE<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></td><td class=\"t m1 x3f8 h12 y6da ff3 fsb fc7 sc0 ls1b ws0\">F<span class=\"_ _1\"></span>AIR V<span class=\"_ _4\"></span>ALUE ADJUST<span class=\"_ _1\"></span><span class=\"ls0\">-<span class=\"_ _1a9\"> </span></span></td><td></td></tr><tr><td class=\"t m1 x12d h12 y6dc ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x506 h12 y6dc ff3 fsb fc7 sc0 ls1b wsbe\">TRANSLA<span class=\"_ _1\"></span>TION<span class=\"_ _3\"></span> </td><td class=\"t m1 x507 h12 y6dd ff3 fsb fc7 sc0 ls1b ws0\">MENT DEFINED </td><td class=\"t m1 x508 h12 y6dc ff3 fsb fc7 sc0 ls1b ws0\">MENTS OF DEBT </td><td class=\"t m1 x3a0 h12 y6dd ff3 fsb fc7 sc0 ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _3\"></span> </td></tr><tr><td></td><td class=\"t m1 x509 h12 y6de ff3 fsb fc7 sc0 ls1b wsbe\">ADJUS<span class=\"_ _4\"></span>TMENT<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x50a h12 y6df ff3 fsb fc7 sc0 ls1b wsbe\">BENEFIT </td><td class=\"t m1 x50b h12 y6de ff3 fsb fc7 sc0 ls1b wsbe\">INSTRUMENTS<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x50c h12 y6df ff3 fsb fc7 sc0 ls1b wsbe\">OCI<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td></td><td class=\"t m1 x1f1 h12 y6e0 ff3 fsb fc7 sc0 ls1b wsbe\">PLANS<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y6e1 w364 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2020<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x50d y6e1 w39d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-378<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x50e y6e1 w39e h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-661<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x50f y6e1 w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x510 y6e1 w16b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-1,039<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6e2 w39f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Movements in OCI<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x511 y6e2 w175 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">122<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x512 y6e2 wae h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">566<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x513 y6e2 wb0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x514 y6e2 w2d3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">683<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6e3 w367 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x515 y6e3 w3a0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-256<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x516 y6e3 w3a1 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-95<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x517 y6e3 w3a2 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-5<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x518 y6e3 w190 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-356<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6e4 w39f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Movements in OCI<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x519 y6e4 wb5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">101<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51a y6e4 wad h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">361<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51b y6e4 wb0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51c y6e4 w3a3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">457<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w36c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51d y515 w3a4 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-155<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51e y515 w3a5 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">266<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51f y515 w3a6 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-10<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x520 y515 w1b0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">101<span class=\"_ _1a9\"> </span></div></td></tr></table>The other reserves movement is detailed as follo<span class=\"_ _4\"></span>ws:  <table class=\"s w3ad h6a\" id=\"_48b77af7-c278-4a37-8691-c9df9ac2a66c\"><tr><td></td><td class=\"t m1 x531 h12 y703 ff3 fsb fc7 sc0 ls1b wsbe\">SHARE-<span class=\"ls0 ws0\"> </span></td><td class=\"t m1 x532 h12 y703 ff3 fsb fc7 sc0 ls1b wsbe\">RET<span class=\"_ _1\"></span>AINED<span class=\"_ _3\"></span> </td><td class=\"t m1 x1f1 h12 y703 ff3 fsb fc7 sc0 ls1b ws0\" colspan=\"2\">F<span class=\"_ _1\"></span>AIR V<span class=\"_ _4\"></span>ALUE </td><td></td></tr><tr><td class=\"t m1 x12d h12 y704 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x531 h12 y705 ff3 fsb fc7 sc0 ls1b wsbe\">BASED </td><td class=\"t m1 x532 h12 y705 ff3 fsb fc7 sc0 ls1b wsbe\">EARNINGS </td><td class=\"t m1 x1f1 h12 y705 ff3 fsb fc7 sc0 ls1b wsbe\">ADJUS<span class=\"_ _4\"></span>T<span class=\"_ _1\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></td><td class=\"c n x533 y706 w3ae h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">OTHER<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x534 y706 w3af h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls3a ws221\">TOT<span class=\"_ _1\"></span>A<span class=\"_ _3\"></span>L<span class=\"_ _1a9\"> </span></div></td></tr><tr><td></td><td class=\"t m1 x531 h12 y707 ff3 fsb fc7 sc0 ls1b wsbe\">P<span class=\"_ _4\"></span>A<span class=\"_ _1\"></span>YMENT </td><td class=\"t m1 x532 h12 y707 ff3 fsb fc7 sc0 ls1b wsbe\">RESERVE </td><td class=\"t m1 x1f1 h12 y707 ff3 fsb fc7 sc0 ls1b wsbe\">MENT </td><td></td><td></td></tr><tr><td></td><td class=\"t m1 x531 h12 y708 ff3 fsb fc7 sc0 ls1b wsbe\">RESERVE<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x532 h12 y708 ff3 fsb fc7 sc0 ls1b wsbe\">FUND<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x1f1 h12 y708 ff3 fsb fc7 sc0 ls1b wsbe\">RESERVE<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"t m0 x12d h14 y709 ff2 fsd fc7 sc0 ls0 ws0\">31 December </td><td class=\"c n x535 y70a w3b0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">12,57<span class=\"_ _1\"></span>4<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x536 y70a w3b1 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-18,706<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x537 y70a w3b2 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-1<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x538 y70a w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x539 y70a w16c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-6<span class=\"_ _4\"></span>,133<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y70b ff2 fsd fc7 sc0 ls0 ws0\">2020<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"c xf0 y70c w3b3 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Movements in<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">other reserves<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53a y70d w3b4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,107<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53b y70d w18c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-453<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53c y70d w41 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">213<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53d y70d w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53e y70d w3b5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">867<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y70e ff2 fsd fc7 sc0 ls0 ws0\">31 December </td><td class=\"c n x53f y70f w3b6 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">13<span class=\"_ _4\"></span>,681<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x540 y70f w3b7 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-19<span class=\"_ _1\"></span>,159<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x541 y70f w3b8 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">212<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x542 y70f w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x543 y70f w3b9 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,266<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y710 ff2 fsd fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"c xf0 y711 w3b3 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Movements in<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">other reserves<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53a y712 w1a3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">933<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x544 y712 w3ba h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-38<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x545 y712 w1a0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,398<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x546 y712 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x547 y712 w3bb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">8,293<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y713 w3bc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ransfer*<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x548 y713 w3bd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-11,433<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x549 y713 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54a y713 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54b y713 w3be h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">11,433<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54c y713 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y714 ff2 fsd fc7 sc0 ls0 ws0\">31 December </td><td class=\"c n x53a y61b w3bf h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,181<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54d y61b w3c0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-19<span class=\"_ _4\"></span>,197<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54e y61b w3c1 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">7<span class=\"_ _25\"></span>,610<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54f y61b w3c2 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">11,433<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x550 y61b w3c3 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,027<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y715 ff2 fsd fc7 sc0 ls0 ws0\">2022<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td></tr></table>*As at December 31<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> the Group rec<span class=\"_ _4\"></span>lassed the recorded share-based payment reserve of the expired and exercised subscription rights to a categor<span class=\"_ _3\"></span>y \u2018other\u2019. The category \u2018Share-based reserve\u2019 expresses now the outstanding share-based payment liability<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>On August 2<span class=\"_ _4\"></span>4<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2020<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> by decision of an EGM of Oxurion,<span class=\"_ _1\"></span> a capital decrease w<span class=\"_ _4\"></span>as initiated and transferr<span class=\"_ _4\"></span>ed within equity to create a reserve fund classified as other reserves for an amount of 5<span class=\"_ _1\"></span>,532,596<span class=\"_ _1\"></span>.62 euro to be able to absorb future losses within the other reser<span class=\"_ _3\"></span>ves. F<span class=\"_ _25\"></span>or the movement in the share-based payment reserve we also refer to note 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.9 where the share-based payment expense of the period is disclosed as emplo<span class=\"_ _4\"></span>yee benefit expense<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Share-based payment plans<span class=\"_ _1a9\"> </span>The Group has cr<span class=\"_ _4\"></span>eated various subscription rights plans that can be granted to personnel and a subscription rights plan for Non-Executive Dir<span class=\"_ _4\"></span>ectors. Since the public listing,<span class=\"_ _4\"></span> all subscription rights p<span class=\"_ _4\"></span>lans have been created in respect of Oxurion.<span class=\"_ _1a9\"> </span>At December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022,<span class=\"_ _4\"></span> there are five outstanding sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>scription rights plans,<span class=\"_ _1\"></span> as follows:<span class=\"_ _1a9\"> </span><table class=\"s w3a7 h69\" id=\"_4830f676-916e-42d2-9529-3aeaef3de84b\"><tr><td class=\"t m1 x34d h12 y6e5 ff3 fsb fc7 sc0 ls1b ws0\">CREA<span class=\"_ _1\"></span>TION DA<span class=\"_ _1\"></span>TE OF PLAN<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x521 h12 y6e6 ff3 fsb fc7 sc0 ls1b ws0\">DA<span class=\"_ _1\"></span>TE GRAN<span class=\"ls0\">-<span class=\"_ _1a9\"> </span></span></td><td class=\"t m1 x522 h12 y6e6 ff3 fsb fc7 sc0 ls1b ws0\">EXERCISE PRICE </td><td class=\"t m1 x523 h12 y6e5 ff3 fsb fc7 sc0 ls1b wsbe\">BENEFICIARY<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td class=\"t m1 x524 h12 y6e7 ff3 fsb fc7 sc0 ls1b wsbe\">TED<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x525 h12 y6e7 ff3 fsb fc7 sc0 ls1b ws0\">(IN EURO)<span class=\"_ _1a9\"> </span></td><td></td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x526 h13 y6e8 ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees,<span class=\"_ _4\"></span> key </td></tr><tr><td class=\"c n xf0 y6e9 w3a8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws259\">Subscription Rights Plan 2017<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x527 y6e9 w3a9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2017-2020</div></td><td class=\"t m2 x522 h13 y6ea ff1 fsc fc7 sc0 ls0 ws0\">Between 2.64 </td><td class=\"t m2 x528 h13 y6ea ff1 fsc fc7 sc0 ls0 ws0\">consultants and </td></tr><tr><td></td><td></td><td class=\"t m2 x529 h13 y6eb ff1 fsc fc7 sc0 ls0 ws0\">and 6<span class=\"_ _4\"></span>.55<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x526 h13 y6eb ff1 fsc fc7 sc0 ls0 ws0\">directors of the </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x3ea h13 y6ec ff1 fsc fc7 sc0 ls0 ws0\">Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6ed ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td></td><td class=\"t m2 x52a h13 y6ee ff1 fsc fc7 sc0 ls0 ws0\">Non-Executive </td></tr><tr><td class=\"t m2 x34d h13 y6ef ff1 fsc fc7 sc0 ls0 ws0\">2020<span class=\"_ _1a9\"> </span></td><td class=\"c n x52b y6f0 w3aa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x52c y6f0 w3ab h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.57</div></td><td class=\"t m2 x526 h13 y6f1 ff1 fsc fc7 sc0 ls0 ws0\">Directors of the </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x3ea h13 y6f2 ff1 fsc fc7 sc0 ls0 ws0\">Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6f3 ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td class=\"t m2 x3ed h13 y6f3 ff1 fsc fc7 sc0 ls0 ws0\">Between 1<span class=\"_ _4\"></span>.75 </td><td class=\"t m2 x526 h13 y6f4 ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees and </td></tr><tr><td class=\"t m2 x34d h13 y6f5 ff1 fsc fc7 sc0 ls0 ws0\">2021-1<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x52d h13 y6f6 ff1 fsc fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x529 h13 y6f5 ff1 fsc fc7 sc0 ls0 ws0\">and 2.60<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x528 h13 y6f6 ff1 fsc fc7 sc0 ls0 ws0\">key consultants </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x52e h13 y6f7 ff1 fsc fc7 sc0 ls0 ws0\">of the Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6f8 ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td></td><td class=\"t m2 x526 h13 y6f9 ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees and </td></tr><tr><td class=\"t m2 x34d h13 y6fa ff1 fsc fc7 sc0 ls0 ws0\">2021-2<span class=\"_ _1a9\"> </span></td><td class=\"c n x52b y6fb w3aa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x52f y6fb w3ac h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>.75</div></td><td class=\"t m2 x528 h13 y6fc ff1 fsc fc7 sc0 ls0 ws0\">key consultants </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x52e h13 y6fd ff1 fsc fc7 sc0 ls0 ws0\">of the Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6fe ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td class=\"t m2 x3e8 h13 y6fe ff1 fsc fc7 sc0 ls0 ws0\">Between 0<span class=\"_ _1\"></span>.444 </td><td class=\"t m2 x526 h13 y6ff ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees and </td></tr><tr><td class=\"t m2 x34d h13 y700 ff1 fsc fc7 sc0 ls0 ws0\">2021-3<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x530 h13 y701 ff1 fsc fc7 sc0 ls0 ws0\">2021-2022<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x525 h13 y700 ff1 fsc fc7 sc0 ls0 ws0\">and 1<span class=\"_ _4\"></span>.82<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x528 h13 y701 ff1 fsc fc7 sc0 ls0 ws0\">key consultants </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x52e h13 y702 ff1 fsc fc7 sc0 ls0 ws0\">of the Group<span class=\"_ _1a9\"> </span></td></tr></table>Brief overview of all outstanding subscription rights granted between 2017<span class=\"_ _1\"></span> and December 31<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022<span class=\"_ _1a9\"> </span>Subscription Rights Plan 2017<span class=\"_ _1a9\"> </span>On November 20<span class=\"_ _25\"></span>, 2017<span class=\"_ _0\"></span>,<span class=\"_ _4\"></span> the EGM of Oxurion decided to<span class=\"_ _1a9\"> </span> issue the Subscription Rights Plan 2017<span class=\"_ _4\"></span> (formerl<span class=\"_ _4\"></span>y referr<span class=\"_ _4\"></span>ed<span class=\"_ _1a9\"> </span> to as the warr<span class=\"_ _4\"></span>ants plan 2017)<span class=\"_ _1\"></span>. Under this Subscription<span class=\"_ _1a9\"> </span> Rights Plan 2017<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> which has a term of ten years and all<span class=\"_ _1a9\"> </span> will lapse in 2027<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> a maximum of 1,440<span class=\"_ _25\"></span>,000 subscription<span class=\"_ _1a9\"> </span> rights can be issued and granted to emplo<span class=\"_ _4\"></span>yees<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> dir<span class=\"_ _4\"></span>ectors,<span class=\"_ _1\"></span> and consultants of the Group<span class=\"_ _4\"></span>. Eac<span class=\"_ _4\"></span>h subscription right<span class=\"_ _1a9\"> </span> entitles the holder to subscribe to one Oxurion share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> Subscription rights are granted under this p<span class=\"_ _4\"></span>lan by the<span class=\"_ _1a9\"> </span> Board of Directors or the Nomination and Rem<span class=\"_ _4\"></span>uneration<span class=\"_ _1a9\"> </span> Committee,<span class=\"_ _1\"></span> except for directors<span class=\"_ _4\"></span>. Authority to grant sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>scription rights to directors is held b<span class=\"_ _4\"></span>y the general meeting<span class=\"_ _1a9\"> </span> of shareholders<span class=\"_ _4\"></span>. Subscription rights are off<span class=\"_ _4\"></span>ered free of<span class=\"_ _1a9\"> </span> charge<span class=\"_ _4\"></span>. The exercise price is equal to the lo<span class=\"_ _4\"></span>w<span class=\"_ _4\"></span>er of (i) the<span class=\"_ _1a9\"> </span> average of the c<span class=\"_ _4\"></span>losing prices of the share on the stoc<span class=\"_ _4\"></span>k<span class=\"_ _1a9\"> </span> market during the 30 days prior to the offering of a sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>scription right or (ii) the closing price on the last stock<span class=\"_ _1a9\"> </span> market day prior to the offer<span class=\"_ _1\"></span>. Subscription rights granted<span class=\"_ _1a9\"> </span> under this plan have a thr<span class=\"_ _4\"></span>ee year gr<span class=\"_ _4\"></span>aded vesting (50%<span class=\"_ _1a9\"> </span> after 2 years and 50% after 3 y<span class=\"_ _4\"></span>ears) with no performance<span class=\"_ _1a9\"> </span> conditions. T<span class=\"_ _4\"></span>he conditions under which a subscription right<span class=\"_ _1a9\"> </span> holder is entitled to exercise a subscription right are estab<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lished by the Nomination and Remuner<span class=\"_ _4\"></span>ation Committee.<span class=\"_ _1a9\"> </span> Subscription Rights Plan 2020<span class=\"_ _1a9\"> </span>On December 23<span class=\"_ _1\"></span>, 2020<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> the Board of Directors pr<span class=\"_ _4\"></span>oposed<span class=\"_ _1a9\"> </span> to issue the Oxurion 2020 Subscription Rights Plan,<span class=\"_ _4\"></span> which<span class=\"_ _1a9\"> </span> was decided b<span class=\"_ _4\"></span>y the A<span class=\"_ _4\"></span>GM held in May 2019<span class=\"_ _1\"></span>. Under this<span class=\"_ _1a9\"> </span> Subscription Rights Plan 2020<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> which has a term of ten<span class=\"_ _1a9\"> </span> years and all subscription rights will lapse in 2030<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> a<span class=\"_ _1a9\"> </span> maximum of 150<span class=\"_ _1\"></span>,000 subscription rights can be issued<span class=\"_ _1a9\"> </span> and granted to Non-Executive Director<span class=\"_ _4\"></span>s of Oxurion. Each<span class=\"_ _1a9\"> </span> subscription right entitles the holder to subscribe to one<span class=\"_ _1a9\"> </span> Oxurion share subject to the payment of the exercise price<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> The exercise price is equal to the lo<span class=\"_ _4\"></span>wer of (i) the a<span class=\"_ _4\"></span>verage<span class=\"_ _1a9\"> </span> of the closing prices of a share on the stoc<span class=\"_ _4\"></span>k market during<span class=\"_ _1a9\"> </span> the 30 days prior to the offering of a subscription right or<span class=\"_ _1a9\"> </span> (ii) the closing price on the last stock market day prior to<span class=\"_ _1a9\"> </span> the offer<span class=\"_ _1\"></span>. Subscription rights granted under this plan ha<span class=\"_ _4\"></span>ve a<span class=\"_ _1a9\"> </span> contractual term of ten y<span class=\"_ _4\"></span>ears and vest immediately<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span> Subscription Rights Plans 2021<span class=\"_ _1a9\"> </span>On April 14<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2021,<span class=\"_ _1\"></span> the Board of Directors of Oxurion<span class=\"_ _1a9\"> </span> decided to issue the Subscription Rights Plan 2021-1<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> Under this Subscription Rights Plan 2021-1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> which has a<span class=\"_ _1a9\"> </span> term of ten years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and all subscription rights will lapse in<span class=\"_ _1a9\"> </span> 2031<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> a maximum of 1<span class=\"_ _1\"></span>.085 million subscription rights can<span class=\"_ _1a9\"> </span> be issued and granted to emplo<span class=\"_ _4\"></span>yees i and consultants of<span class=\"_ _1a9\"> </span> the Group<span class=\"_ _4\"></span>. Eac<span class=\"_ _4\"></span>h subscription right entitles the holder to<span class=\"_ _1a9\"> </span> subscribe to one Oxurion share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On September 22,<span class=\"_ _4\"></span> 2021<span class=\"_ _1\"></span>, the Boar<span class=\"_ _4\"></span>d of Directors of Oxurion<span class=\"_ _1a9\"> </span> has decided to issue the Subscription Rights Plan 2021-2.<span class=\"_ _1a9\"> </span> Under this Subscription Rights Plan 2021-2,<span class=\"_ _4\"></span> which has<span class=\"_ _1a9\"> </span> a term of ten years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and all subscription rights will lapse<span class=\"_ _1a9\"> </span> in 2031<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> a maximum of 550<span class=\"_ _1\"></span>,000 subscription rights can<span class=\"_ _1a9\"> </span> be issued and granted to emplo<span class=\"_ _4\"></span>yees and consultants of<span class=\"_ _1a9\"> </span> the Group<span class=\"_ _4\"></span>. Eac<span class=\"_ _4\"></span>h subscription right entitles the holder to<span class=\"_ _1a9\"> </span> subscribe to one Oxurion share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On December 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _1\"></span>, the Boar<span class=\"_ _4\"></span>d of Directors of Oxurion<span class=\"_ _1a9\"> </span> has decided to issue the Subscription Rights Plan 2021-3<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span> Under this Subscription Rights Plan 2021-3<span class=\"_ _1\"></span>, whic<span class=\"_ _4\"></span>h has a<span class=\"_ _1a9\"> </span> term of ten years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and all will lapse in 203<span class=\"_ _4\"></span>1<span class=\"_ _1\"></span>, a maximum of<span class=\"_ _1a9\"> </span> 862,000 subscription rights can be issued and granted to<span class=\"_ _1a9\"> </span> emplo<span class=\"_ _4\"></span>yees and consultants of the Group<span class=\"_ _1\"></span>. Each subscrip<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion right entitles the holder to subscribe to one Oxurion<span class=\"_ _1a9\"> </span> share<span class=\"_ _4\"></span>.  These plans ar<span class=\"_ _4\"></span>e collectively r<span class=\"_ _4\"></span>eferred to as the<span class=\"_ _1a9\"> </span> Subscription Rights Plans 2021<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Subscription rights are granted under the Subscription<span class=\"_ _1a9\"> </span> Rights Plans 2021 by the Board of Dir<span class=\"_ _4\"></span>ectors or the<span class=\"_ _1a9\"> </span> Nomination and Remuneration Committee<span class=\"_ _4\"></span>. Subscription<span class=\"_ _1a9\"> </span> rights are offer<span class=\"_ _4\"></span>ed free of charge<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he exercise price is<span class=\"_ _1a9\"> </span> equal to the low<span class=\"_ _4\"></span>er of (i) the volume weighted a<span class=\"_ _4\"></span>verage price<span class=\"_ _1a9\"> </span><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws99 gs1e1\">(VW<span class=\"_ _1\"></span>AP) of the Company\u2019<span class=\"_ _25\"></span>s shares on the stock exchange </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1aa gs1e2\">over a period of thirty calendar days prior to the date of </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws8b gs1e3\">the offer or (ii) the closing price of the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s shares </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws38 gs1e4\">on the last business day prior to the date of the offer<span class=\"_ _1\"></span>. In </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws172 gs1e5\">general,<span class=\"_ _4\"></span> half of the subscription rights under these p<span class=\"_ _4\"></span>lans </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws100 gs1e6\">vest after one year and the other half vest quarterly over </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws167 gs1e7\">the follo<span class=\"_ _4\"></span>wing two y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or the subscription rights granted </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws145 gs1e8\">in April 2021 under the Subscription Rights Plan 2021-1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb7 gs1e9\">vesting period exceptionally commenced on December </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsff gs1ea\">28<span class=\"_ _1\"></span>, 2020<span class=\"_ _25\"></span>. The conditions under which a subscription rights </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws167 gs1eb\">holder is entitled to exercise a subscription right are estab<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs1ec\">lished by the Nomination and Remuner<span class=\"_ _4\"></span>ation Committee. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws4d gs1ed\">The grant date f<span class=\"_ _4\"></span>air values of the subscription rights granted </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws17a gs1ee\">under the different Subscription Plans ha<span class=\"_ _4\"></span>ve been deter<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws52 gs1ef\">mined by using the Blac<span class=\"_ _4\"></span>k &amp; Scholes model,<span class=\"_ _4\"></span> taking into </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs1f0\">account the follo<span class=\"_ _4\"></span>wing assumptions:<span class=\"_ _1a9\"> </span></div><div class=\"t m1 h12 ff3 fsb fc7 sc0 ls1b ws0 gs1f1\">2017 SUBSCRIPTION PLAN<span class=\"_ _175\"> </span><span class=\"wsbe\">ASSUMPTIONS<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 h12 ff3 fsb fc7 sc0 ls1b ws0 gs1f2\">GRANT DA<span class=\"_ _1\"></span>TE<span class=\"_ _176\"> </span>DEC 17<span class=\"_ _6\"> </span>DEC 17<span class=\"_ _6\"> </span>JUN 18<span class=\"_ _1f\"> </span>DEC 18<span class=\"_ _1f\"> </span>DEC 18<span class=\"_ _2\"> </span>JUL 19<span class=\"_ _1f\"> </span>DEC 19<span class=\"_ _1f\"> </span>DEC 19<span class=\"_ _b\"> </span>JUN 20<span class=\"_ _177\"> </span>AUG 20<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs1f3\">Number of warrants gr<span class=\"_ _4\"></span>anted<span class=\"_ _12\"> </span>251<span class=\"_ _4\"></span>,000<span class=\"_ _67\"> </span>150<span class=\"_ _4\"></span>,000<span class=\"_ _12\"> </span>33<span class=\"_ _4\"></span>,500<span class=\"_ _5a\"> </span>208,000<span class=\"_ _67\"> </span>150<span class=\"_ _4\"></span>,000<span class=\"_ _12\"> </span>44,300<span class=\"_ _65\"> </span>136<span class=\"_ _4\"></span>,000<span class=\"_ _65\"> </span>125,000<span class=\"_ _12\"> </span>43<span class=\"_ _4\"></span>,500<span class=\"_ _b1\"> </span>10<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs1f4\">Current share price on grant </div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs1f5\">date (in euro)<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs1f6\">3<span class=\"_ _4\"></span>.38<span class=\"_ _35\"> </span>3<span class=\"_ _1\"></span>.38<span class=\"_ _56\"> </span>7<span class=\"_ _1\"></span>.07<span class=\"_ _35\"> </span>3<span class=\"_ _4\"></span>.52<span class=\"_ _45\"> </span>3.52<span class=\"_ _32\"> </span>4.65<span class=\"_ _5d\"> </span>2.875<span class=\"_ _b\"> </span>2.875<span class=\"_ _35\"> </span>3.07<span class=\"_ _45\"> </span>2.72<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs1f7\">Exercise price<span class=\"_ _2c\"> </span>3<span class=\"_ _4\"></span>.38<span class=\"_ _5d\"> </span>4<span class=\"_ _4\"></span>.593<span class=\"_ _5d\"> </span>6<span class=\"_ _1\"></span>.549<span class=\"_ _e2\"> </span><span class=\"ls3e ws222\">3.4<span class=\"_ _b\"> </span></span>4.593<span class=\"_ _5d\"> </span>3.822<span class=\"_ _32\"> </span>2.64<span class=\"_ _5d\"> </span>4.593<span class=\"_ _b\"> </span>2.847<span class=\"_ _73\"> </span>2.8<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs1f8\">Expected dividend yield<span class=\"_ _116\"> </span>-<span class=\"_ _105\"> </span>-<span class=\"_ _103\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _103\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs1f9\">Expected stock price volatility<span class=\"_ _48\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _7d\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _2\"> </span>60%<span class=\"_ _7d\"> </span>60%<span class=\"_ _7d\"> </span>60%<span class=\"_ _2\"> </span>60%<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs1fa\">Risk<span class=\"_ _4\"></span>-free interest r<span class=\"_ _4\"></span>ate<span class=\"_ _28\"> </span>0<span class=\"_ _4\"></span>.59%<span class=\"_ _1b\"> </span>0<span class=\"_ _4\"></span>.59%<span class=\"_ _177\"> </span>0<span class=\"_ _4\"></span>.73%<span class=\"_ _1b\"> </span>0<span class=\"_ _4\"></span>.69%<span class=\"_ _f\"> </span>0.69%<span class=\"_ _b1\"> </span>-0.25%<span class=\"_ _f\"> </span>-0<span class=\"_ _1\"></span>.12%<span class=\"_ _1b\"> </span>-0<span class=\"_ _4\"></span>.12%<span class=\"_ _7e\"> </span>-0<span class=\"_ _4\"></span>.23%<span class=\"_ _7e\"> </span>-0<span class=\"_ _1\"></span>.38%<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs1fb\">Expected duration<span class=\"_ _55\"> </span>10<span class=\"_ _13\"> </span>10<span class=\"_ _3a\"> </span><span class=\"ls52 ws25b\">9.<span class=\"_ _23\"></span>5<span class=\"_ _2b\"> </span></span>9<span class=\"_ _101\"> </span>9<span class=\"_ _79\"> </span><span class=\"ls3e ws222\">8.<span class=\"_ _3\"></span>5<span class=\"_ _53\"> </span></span>8<span class=\"_ _82\"> </span>8<span class=\"_ _38\"> </span><span class=\"ls53 ws25c\">7.<span class=\"_ _23\"></span>5<span class=\"_ _36\"> </span>7.<span class=\"_ _23\"></span>5<span class=\"_ _1a9\"> </span></span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs1fc\">F<span class=\"_ _4\"></span>air value<span class=\"_ _118\"> </span>1<span class=\"_ _4\"></span>.56<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.29<span class=\"_ _35\"> </span>3<span class=\"_ _4\"></span>.33<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.58<span class=\"_ _36\"> </span><span class=\"ls4d ws252\">1.3<span class=\"_ _35\"> </span></span>2.23<span class=\"_ _74\"> </span>1.75<span class=\"_ _56\"> </span>1.43<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.83<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.56<span class=\"_ _1a9\"> </span></div><div class=\"t m1 h12 ff3 fsb fc7 sc0 ls1b ws0 gs1fe\">2020 SUBSCRIPTION PLAN<span class=\"_ _b6\"> </span><span class=\"wsbe\">ASSUMPTIONS<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 h12 ff3 fsb fc7 sc0 ls1b ws0 gs1ff\">GRANT DA<span class=\"_ _1\"></span>TE<span class=\"_ _1c\"> </span>MAR 21<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs200\">Number of warrants gr<span class=\"_ _4\"></span>anted<span class=\"_ _9e\"> </span>75<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs201\">Current share price on grant date </div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs202\">(in euro)<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs203\">2.55<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs204\">Exercise price<span class=\"_ _17a\"> </span>2.57<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs205\">Expected dividend yield<span class=\"_ _17b\"> </span>-<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs206\">Expected stock price volatility<span class=\"_ _9\"> </span>45%<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs207\">Risk<span class=\"_ _4\"></span>-free interest r<span class=\"_ _4\"></span>ate<span class=\"_ _10b\"> </span>-0.16%<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs208\">Expected duration<span class=\"_ _113\"> </span>9<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs209\">F<span class=\"_ _4\"></span>air value<span class=\"_ _97\"> </span>1<span class=\"_ _4\"></span>.23<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs20a\">The assumptions used in determining the fair value of the subscription rights gr<span class=\"_ _4\"></span>anted are based on the follo<span class=\"_ _4\"></span>wing data: </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs20b\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws6e\">Current share price on grant date \u2013 the c<span class=\"_ _4\"></span>losing price </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs20c\">on the stock market of Euronext Brussels<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs20d\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws58\">Expected stock price volatility \u2013 the historical volatility </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs20e\">of Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s share price.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs20f\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws25d\">Expected duration \u2013 calculated as the estimated </span></div><div class=\"gs210\"><table class=\"s w3c4 h6b\" id=\"_520e5b8c-0cd4-4774-8e2e-f3f3b3713294\"><tr><td class=\"t m1 x552 he y716 ff1 fs9 fc7 sc0 ls0 ws75\">duration until exercise<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> taking into account the specific </td></tr><tr><td class=\"t m1 x552 he y717 ff1 fs9 fc7 sc0 ls0 ws0\">features of the p<span class=\"_ _4\"></span>lans.<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m1 x553 he y718 ff1 fs9 fc7 sc0 ls0 ws0\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws31\">Risk<span class=\"_ _4\"></span>-free inter<span class=\"_ _4\"></span>est rate \u2013 based on the Belgian go<span class=\"_ _4\"></span>vern<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></span></td></tr><tr><td class=\"t m1 x552 he y719 ff1 fs9 fc7 sc0 ls0 ws39\">ment bond rates at the date of granting with a term </td></tr><tr><td class=\"t m1 x552 he y71a ff1 fs9 fc7 sc0 ls0 ws0\">equal to the expected life of the subscription rights<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></td></tr></table></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsde gs211\">Movements in the number of subscription rights outstand<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws2c gs212\">ing and their related w<span class=\"_ _4\"></span>eighted average exercise prices ar<span class=\"_ _4\"></span>e </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs213\">as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span></div><div class=\"gs214\"><table class=\"s w20d h6c\" id=\"_7c714e05-b03c-4d67-997b-b6b9644ab0c0\"><tr><td></td><td class=\"c n x554 y71b w61 h41\" colspan=\"2\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x555 y71b w62 h41\" colspan=\"2\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td></td><td class=\"t m1 x556 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">A<span class=\"_ _4\"></span>VERA<span class=\"_ _4\"></span>GE </td><td class=\"t m1 x3a2 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">SUB-<span class=\"ls0 ws0\"> </span></td><td class=\"t m1 x557 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">A<span class=\"_ _4\"></span>VERA<span class=\"_ _4\"></span>GE </td><td class=\"t m1 x558 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">SUB-<span class=\"ls0 ws0\"> </span></td></tr><tr><td></td><td class=\"t m1 x556 h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">EXERCISE </td><td class=\"t m1 x50a h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">SCRIPTION <span class=\"_ _0\"></span><span class=\"ls0 ws0\"> </span></td><td class=\"t m1 x557 h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">EXERCISE </td><td class=\"t m1 x559 h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">SCRIPTION <span class=\"_ _0\"></span><span class=\"ls0 ws0\"> </span></td></tr><tr><td></td><td class=\"t m1 x55a h12 y71e ff3 fsb fc7 sc0 ls1b ws0\">PRICE IN EUR<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x55b h12 y71e ff3 fsb fc7 sc0 ls1b wsbe\">RIGHTS<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x401 h12 y71e ff3 fsb fc7 sc0 ls1b ws0\">PRICE IN EUR<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x55c h12 y71e ff3 fsb fc7 sc0 ls1b wsbe\">RIGHTS<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y71f w3c5 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">As at 1 January<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x55d y71f w3c6 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">2.52<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x55e y71f w3c7 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,131<span class=\"_ _4\"></span>,250<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x55f y71f w3c8 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>.84<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x560 y71f w3c9 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">893,800<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y720 w3ca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Granted<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> accepted<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x561 y720 w3cb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.44<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x562 y720 wca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,000<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x563 y720 w3cc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.11<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x564 y720 w3cd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,431,000<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y721 w3ce h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>orfeited<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x565 y721 w3cf h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.46<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x566 y721 w3d0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-172,970<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x567 y721 w3d1 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3.30<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x568 y721 w3d2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-193<span class=\"_ _4\"></span>,550<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y722 w3d3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Exercised<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x569 y722 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56a y722 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56b y722 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56c y722 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w3d4 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">As at 31 December<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56d y515 w3d5 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2.54<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56e y515 w3d6 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2,959<span class=\"_ _4\"></span>,280<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56f y515 w3d7 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2.52<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x570 y515 w3d8 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">3<span class=\"_ _1\"></span>,131,250<span class=\"_ _1a9\"> </span></div></td></tr></table></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws84 gs215\">Outstanding vested subscription rights at December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws88 gs216\">2022,<span class=\"_ _4\"></span> have the f<span class=\"_ _4\"></span>ollowing ear<span class=\"_ _4\"></span>liest exercise date,<span class=\"_ _1\"></span> maturities </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs217\">and exercise prices:<span class=\"_ _1a9\"> </span></div><div class=\"t m1 h12 ff3 fsb fc7 sc0 ls1b ws0 gs218\">EARLIEST EXERCISE </div><div class=\"t m1 h12 ff3 fsb fc7 sc0 ls32 ws1f7 gs219\">D<span class=\"_ _3\"></span>AT<span class=\"_ _5\"> </span>E<span class=\"_ _1a9\"> </span></div><div class=\"t m1 h12 ff3 fsb fc7 sc0 ls1b ws0 gs21a\">EXPIRY DA<span class=\"_ _1\"></span>TE<span class=\"_ _1a9\"> </span></div><div class=\"t m1 h12 ff3 fsb fc7 sc0 ls1b ws0 gs21b\">EXERCISE PRICE (IN </div><div class=\"t m1 h12 ff3 fsb fc7 sc0 ls1b wsbe gs21c\">EURO)<span class=\"_ _1a9\"> </span></div><div class=\"t m1 h12 ff3 fsb fc7 sc0 ls1b wsbe gs21d\">NUMBER </div><div class=\"t m1 h12 ff3 fsb fc7 sc0 ls1b wsbe gs21e\">(THOUSANDS)<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs21f\">2023<span class=\"_ _11e\"> </span>2027<span class=\"_ _9\"> </span>3<span class=\"_ _4\"></span>.95<span class=\"_ _91\"> </span>692<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs220\">2023<span class=\"_ _179\"> </span>2030<span class=\"_ _91\"> </span>2.57<span class=\"_ _84\"> </span>60<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs221\">2023<span class=\"_ _117\"> </span>203<span class=\"_ _4\"></span>1<span class=\"_ _94\"> </span>2.23<span class=\"_ _fe\"> </span>1,171<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h14 ff2 fsd fc7 sc0 ls0 ws0 gs222\">T<span class=\"_ _1\"></span>otal weighted </div><div class=\"t m0 h14 ff2 fsd fc7 sc0 ls0 ws0 gs223\">average<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h14 ff2 fsd fc7 sc0 ls0 ws0 gs224\">2.86<span class=\"_ _80\"> </span>1<span class=\"_ _4\"></span>,923<span class=\"_ _1a9\"> </span></div>5.7<span class=\"_ _25\"></span>.9 <span class=\"_ _159\"> </span><span class=\"ls18 ws95\">Employee Benefit O<span class=\"_ _3\"></span>bligat<span class=\"_ _4\"></span>ions<span class=\"_ _1a9\"> </span></span>Oxurion offers its emplo<span class=\"_ _4\"></span>yees r<span class=\"_ _4\"></span>etirement benefits that ar<span class=\"_ _4\"></span>e<span class=\"_ _1a9\"> </span> funded through a group insurance p<span class=\"_ _4\"></span>lan managed by an<span class=\"_ _1a9\"> </span> insurance fund<span class=\"_ _1\"></span>. Until June 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2009<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the insur<span class=\"_ _4\"></span>ance group<span class=\"_ _1a9\"> </span> plan w<span class=\"_ _4\"></span>as based on a \u201cdefined benefit\u201d system. In a defined<span class=\"_ _1a9\"> </span> benefit pension plan,<span class=\"_ _1\"></span> an employer commits to paying its<span class=\"_ _1a9\"> </span> emplo<span class=\"_ _4\"></span>yee a specific benefit for lif<span class=\"_ _4\"></span>e beginning at his or her<span class=\"_ _1a9\"> </span> retirement. T<span class=\"_ _4\"></span>he amount of the benefit is known in ad<span class=\"_ _4\"></span>vance,<span class=\"_ _1\"></span> and is usually based on factors suc<span class=\"_ _4\"></span>h as age,<span class=\"_ _1\"></span> earnings,<span class=\"_ _4\"></span> and<span class=\"_ _1a9\"> </span> years of service. Defined benefit plans do not ha<span class=\"_ _4\"></span>ve con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tribution limits,<span class=\"_ _1\"></span> but they do have a limit on the maximum<span class=\"_ _1a9\"> </span> annual retir<span class=\"_ _4\"></span>ement benefit.<span class=\"_ _1a9\"> </span>Since July 1<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2009<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the defined benefit plan w<span class=\"_ _4\"></span>as changed<span class=\"_ _1a9\"> </span> into a pension plan that is structur<span class=\"_ _4\"></span>ed as a defined con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tribution plan,<span class=\"_ _1\"></span> but that should be accounted for as a<span class=\"_ _1a9\"> </span> defined benefit plan in accordance with IFRS<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> since the<span class=\"_ _1a9\"> </span> company offer<span class=\"_ _4\"></span>s a minimum guaranteed return to the p<span class=\"_ _4\"></span>lan<span class=\"_ _1a9\"> </span> participants.<span class=\"_ _1a9\"> </span> The amounts recognized in the statement of financial<span class=\"_ _1a9\"> </span> position can be broken do<span class=\"_ _4\"></span>wn as follows:<span class=\"_ _1a9\"> </span><table class=\"s w3d9 h6d\" id=\"_9c52cadc-e14c-4106-97bf-db1a084b8778\"><tr><td></td><td class=\"c n x571 y723 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x572 y723 w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y724 w3da h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Defined benefit obligation<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x573 y724 w3db h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,707<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x574 y724 w3dc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">5<span class=\"_ _4\"></span>,015<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y725 w3dd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>air value of plan assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x575 y725 w3de h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-4<span class=\"_ _4\"></span>,548<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x576 y725 w3df h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-4,421<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w3e0 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">Net defined benefit liability<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x577 y515 w3e h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">159<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x578 y515 w12a h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">594<span class=\"_ _1a9\"> </span></div></td></tr></table>The amounts recognized in the statement of financi<span class=\"_ _1a9\"> </span>al position and the movements in the net defined benef<span class=\"_ _1a9\"> </span>it obligations are as f<span class=\"_ _4\"></span>ollows: <table class=\"s w3e1 h6e\" id=\"_509979e4-c730-4426-8ec7-75b20272694f\"><tr><td></td><td class=\"t m1 x579 h12 y726 ff3 fsb fc7 sc0 ls1b wsbe\">PRESENT </td><td class=\"t m1 x57a h12 y727 ff3 fsb fc7 sc0 ls1b ws0\" colspan=\"2\">F<span class=\"_ _1\"></span>AIR V<span class=\"_ _4\"></span>ALUE OF </td></tr><tr><td class=\"t m1 x34d h12 y728 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x524 h12 y728 ff3 fsb fc7 sc0 ls1b ws0\">V<span class=\"_ _4\"></span>ALUE OF </td><td class=\"t m1 x57b h12 y729 ff3 fsb fc7 sc0 ls1b ws0\">PLAN ASSETS<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x3ef h12 y728 ff3 fsb fc7 sc0 ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td class=\"t m1 x57c h12 y72a ff3 fsb fc7 sc0 ls1b wsbe\">OBLIGA<span class=\"_ _1\"></span>TION<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y72b w3e2 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">As at 1 January 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x57d y72b w3e3 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">5,361<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x57e y72b w3e4 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-4,265<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x57f y72b w3e5 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,096<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y72c w3e6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Current service cost<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x580 y72c w92 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">369<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x581 y72c wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x582 h14 y72d ff2 fsd fc7 sc0 ls0 ws0\">369<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y72e w3e7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Past service cost<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x583 y72e wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x584 y72e wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y72f ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y730 w3e8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Interest expense/(income)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x586 y730 w33c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">31<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x587 y730 w23d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-26<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y731 ff2 fsd fc7 sc0 ls0 ws0\">6<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h29 y732 ffa fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal amount recognized in profit </td><td class=\"c n x588 y733 w2c7 h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">400<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x589 y733 w23d h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">-26<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58a h14 y734 ff2 fsd fc7 sc0 ls54 ws25f\">3<span class=\"_ _23\"></span>74<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h29 y735 ffa fsc fc7 sc0 ls0 ws0\">or loss<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c xf0 y736 w3e9 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Actuarial gains/(losses) on<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">DBO due to change in financial<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x588 y736 w123 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-165<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x58b y736 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58c h14 y737 ff2 fsd fc7 sc0 ls0 ws0\">-165<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y738 ff1 fsc fc7 sc0 ls0 ws0\">assumptions<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y739 w3ea h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Changes in return of plan assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x58d y739 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x58e y739 w3eb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-66<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58a h14 y73a ff2 fsd fc7 sc0 ls0 ws0\">-66<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y73b ff1 fsc fc7 sc0 ls0 ws0\">Actuarial gains/(losses) on DBO </td><td class=\"c n x58f y73c w3ec h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-335<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x590 y73c w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x591 h14 y73d ff2 fsd fc7 sc0 ls0 ws0\">-335<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y73e ff1 fsc fc7 sc0 ls0 ws0\">due to experience adjustments<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c xf0 y740 w3ed h6f\"><div class=\"t m2 xca h29 y73f ffa fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal amount recognized in other<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">comprehensive income<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x58f y741 w3ee h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">-500<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x592 y741 w3ef h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">-66<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x591 h14 y742 ff2 fsd fc7 sc0 ls0 ws0\">-566<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y743 w3f0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>er contributions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x593 y743 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x594 y743 w3f1 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-310<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58c h14 y744 ff2 fsd fc7 sc0 ls0 ws0\">-310<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y745 w3f2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee contributions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x595 y745 w209 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">67<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x596 y745 w3f3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-67<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y746 ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y747 w3f4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Benefit payments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x597 y747 w2e6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-214<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x598 y747 w175 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">214<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y748 ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y749 w3f5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>axes on contributions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x599 y749 w3f6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-39<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x59a y749 w11d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">39<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y74a ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c xf0 y74b w3f7 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Insurance premiums related to<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">risk coverages<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x59b y74c w3f8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-61<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x59c y74c w1a5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">61<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y74d ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y74e w3f9 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">As at 31 December 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x59d y74e w3fa h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">5,015<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x59e y74e w3fb h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-4,421<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x59f y74e w3fc h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">594<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y74f w3e6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Current service cost<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a0 y74f wad h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">185<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a1 y74f w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58a h14 y750 ff2 fsd fc7 sc0 ls0 ws0\">185<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y751 w3e7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Past service cost<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x583 y751 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x584 y751 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y752 ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y753 w3e8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Interest expense/(income)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a2 y753 w3fd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">53<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a3 y753 wb5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-47<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x5a4 h14 y754 ff2 fsd fc7 sc0 ls0 ws0\">7<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h29 y755 ffa fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal amount recognized in profit </td><td class=\"c n x588 y756 w3fe h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">238<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a5 y756 wb5 h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">-47<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x5a6 h14 y757 ff2 fsd fc7 sc0 ls0 ws0\">191<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h29 y758 ffa fsc fc7 sc0 ls0 ws0\">or loss<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c xf0 y759 w3e9 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Actuarial gains/(losses) on<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">DBO due to change in financial<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x58f y759 w3ff h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-245<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a7 y759 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x591 h14 y75a ff2 fsd fc7 sc0 ls0 ws0\">-245<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y75b ff1 fsc fc7 sc0 ls0 ws0\">assumptions<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y75c w3ea h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Changes in return of plan assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x58d y75c w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a8 y75c w400 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-45<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58a h14 y75d ff2 fsd fc7 sc0 ls0 ws0\">-45<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y75e ff1 fsc fc7 sc0 ls0 ws0\">Actuarial gains/(losses) on DBO </td><td class=\"c n x58f y75f w401 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-283<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a9 y75f w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x591 h14 y760 ff2 fsd fc7 sc0 ls0 ws0\">-283<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y761 ff1 fsc fc7 sc0 ls0 ws0\">due to demographic adjustments<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"t m2 x34d h13 y762 ff1 fsc fc7 sc0 ls0 ws0\">Actuarial gains/(losses) on DBO </td><td class=\"c n x5aa y763 w41 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">213<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ab y763 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58a h14 y764 ff2 fsd fc7 sc0 ls0 ws0\">213<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y765 ff1 fsc fc7 sc0 ls0 ws0\">due to experience adjustments<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c xf0 y766 w3ed h6f\"><div class=\"t m2 xca h29 y73f ffa fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal amount recognized in other<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">comprehensive income<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x588 y767 w1c7 h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">-315<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ac y767 w400 h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">-45<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58c h14 y768 ff8 fsd fc7 sc0 ls0 ws0\">-361<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y769 w3f0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>er contributions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x593 y769 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ad y769 w223 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-266<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x591 h14 y76a ff2 fsd fc7 sc0 ls0 ws0\">-266<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y76b w3f2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee contributions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ae y76b w65 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">60<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5af y76b w402 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-60<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y76c ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y76d w3f4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Benefit payments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b0 y76d w403 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-202<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b1 y76d w2e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">202<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y76e ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y76f w3f5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>axes on contributions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x599 y76f w141 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-34<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b2 y76f w298 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">34<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y770 ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c xf0 y771 w3f7 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Insurance premiums related to<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">risk coverages<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5aa y772 w404 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-54<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b3 y772 w405 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">54<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y773 ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y515 w406 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">As at 31 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b4 y515 w407 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">4,707<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b5 y515 w408 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-4,548<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b6 y515 w29b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">159<span class=\"_ _1a9\"> </span></div></td></tr></table>The significant actuarial assumptions used to calculate the<span class=\"_ _1a9\"> </span> net defined benefit liability wer<span class=\"_ _4\"></span>e as follows: <table class=\"s w409 h70\" id=\"_f1f47ca9-20e1-42fb-9eb6-a8dd2a0460ee\"><tr><td></td><td class=\"c n x5b7 y774 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b8 y774 w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y775 w40a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Discount rate<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b9 y775 w40b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3.80%<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ba y775 w40c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1.10%<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y776 w40d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Inflation rate short term<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5bb y776 w40e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">9<span class=\"_ _4\"></span>.30%<span class=\"_ _1a9\"> </span></div></td><td class=\"t m2 x5bc h13 y777 ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>.80%<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y616 w40f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Inflation rate long term<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5bd y616 w410 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.50%<span class=\"_ _1a9\"> </span></div></td><td></td></tr><tr><td class=\"c xf0 y618 w411 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Salary increase rate on top of<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">inflation rate<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5be y619 w412 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.00%<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5bf y619 w413 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1.20%<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y778 ff1 fsc fc7 sc0 ls0 ws0\">Mortality tables<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x5c0 h13 y779 ff1 fsc fc7 sc0 ls0 ws0\">MR/FR with age </td><td class=\"t m2 x5c1 h13 y779 ff1 fsc fc7 sc0 ls0 ws0\">MR/FR with age <span class=\"_ _107\"></span> </td></tr><tr><td></td><td class=\"t m2 x3a1 h13 y77a ff1 fsc fc7 sc0 ls0 ws0\">correction of 3 years<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x5c2 h13 y77a ff1 fsc fc7 sc0 ls0 ws0\">correction of 3 years<span class=\"_ _1a9\"> </span></td></tr></table>Sensitivity analysis considering a change of 0<span class=\"_ _25\"></span>.25% in the<span class=\"_ _1a9\"> </span> discount rate (positive = increase net defined benefit liability<span class=\"_ _1a9\"> </span> / negative = decrease of net defined benefit liability):<span class=\"_ _1a9\"> </span>IN '000 EURO<span class=\"_ _183\"> </span><span class=\"ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _1a9\"> </span></span>DBO considering an increase of 0<span class=\"_ _1\"></span>,25% in the discount rate<span class=\"_ _10f\"> </span>-15<span class=\"_ _1a9\"> </span>DBO considering a decrease of 0<span class=\"_ _1\"></span>,25% in the discount rate<span class=\"_ _151\"> </span>+14<span class=\"_ _1a9\"> </span>The expected future benefits to be paid ar<span class=\"_ _4\"></span>e as follo<span class=\"_ _4\"></span>ws: <table class=\"s w42d h72\" id=\"_4b857bee-141d-4c70-9985-0870570d51a8\"><tr><td class=\"t m1 x12d h12 y79c ff3 fsb fc7 sc0 ls1b ws0\" colspan=\"2\">IN '000 EURO<span class=\"_ _184\"> </span><span class=\"ls0\"> </span></td></tr><tr><td class=\"c n xf0 y79d w42e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2023<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e0 y79d w35a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">120<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6c0 w42f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2024<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e1 y6c0 w430 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">54<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y517 w431 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2025<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e2 y517 wb5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">101<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y518 w2c1 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2026<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e3 y518 wb3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">165<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w432 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2027<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e4 y515 w259 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">233<span class=\"_ _1a9\"> </span></div></td></tr></table>5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _5\"></span>1<span class=\"_ _27\"></span>0<span class=\"_ _2f\"> </span> <span class=\"_ _189\"> </span><span class=\"ls18 ws95\">Other sh<span class=\"_ _3\"></span>or<span class=\"_ _3\"></span>t<span class=\"_ _4\"></span>-<span class=\"_ _1\"></span>term liabilities<span class=\"_ _1a9\"> </span></span><table class=\"s w433 h73\" id=\"_ab84c568-c59f-420f-be64-deb4a11db001\"><tr><td class=\"t m1 x12d h12 y79e ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 </td><td class=\"c n x5e5 y79f w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e6 y79f w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m1 x12d h12 y7a0 ff3 fsb fc7 sc0 ls1b wsbe\">DECEMBER)<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y7a1 w20e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e7 y7a1 w434 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">548<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e8 y7a1 w435 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,684<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y7a2 w436 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other current liabilities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e9 y7a2 w28e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,813<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ea y7a2 w257 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">628<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h1d y7a3 ff2 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal other shor<span class=\"_ _3\"></span>t-term </td><td class=\"c n x5eb y61b w437 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,361<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ec y61b w438 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2,3<span class=\"_ _4\"></span>12<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h1d y7a4 ff2 fsc fc7 sc0 ls0 ws0\">liabilities<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr></table>Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s Defined Benefit Obligation (<span class=\"ff3 ws0\">\u201cDBO\u201d</span>) is a non-cur<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>rent liability<span class=\"_ _25\"></span>. Emplo<span class=\"_ _4\"></span>yee benefits include ho<span class=\"_ _4\"></span>liday pay<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> bonus,<span class=\"_ _1\"></span> and out<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>standing emplo<span class=\"_ _4\"></span>yee taxes<span class=\"_ _4\"></span>. The other curr<span class=\"_ _4\"></span>ent liabilities consist of commitments that expire befor<span class=\"_ _4\"></span>e year<span class=\"_ _1\"></span>-end<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> but for which an invoice w<span class=\"_ _4\"></span>as not yet r<span class=\"_ _4\"></span>eceived<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _5\"></span>1<span class=\"_ _27\"></span>1<span class=\"_ _2f\"></span> <span class=\"_ _69\"> </span><span class=\"ls18 ws95\">Conver<span class=\"_ _3\"></span>tible loans<span class=\"_ _1a9\"> </span></span>The convertible loans include the f<span class=\"_ _4\"></span>ollowing:<span class=\"_ _1a9\"> </span><table class=\"s w414 h71\" id=\"_54b2a5ea-7bdc-4f2c-8657-e14a1438199a\"><tr><td class=\"t m1 x34d h12 y77b ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x5c3 h12 y77c ff3 fsb fc7 sc0 ls1b ws0\">KREOS / </td><td class=\"c n x5c4 y77d w415 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">NEGMA<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5c5 y77d w416 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls3a ws221\">TOTAL<span class=\"_ _1a9\"> </span></div></td></tr><tr><td></td><td class=\"t m1 x524 h12 y77e ff3 fsb fc7 sc0 ls1b wsbe\">PONTIF<span class=\"_ _1\"></span>AX<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y77f w364 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2020<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5c6 y77f w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5c7 y77f w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5c8 y77f w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c xf0 y780 w417 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Proceeds from loans and<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">borrowings<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5c9 y781 w418 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">10<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ca y781 w419 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,500</div></td><td class=\"t m0 x5cb h14 y782 ff2 fsd fc7 sc0 ls0 ws0\">12,500<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y783 w41a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Commitment fee<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5cc y783 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5cd y783 w41b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">525<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x582 h14 y784 ff2 fsd fc7 sc0 ls0 ws0\">525<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y785 w41c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Converted into capital<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ce y785 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5cf y785 w161 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,350</div></td><td class=\"t m0 x3ea h14 y786 ff2 fsd fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,350<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y787 w41d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>air value adjustment<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d0 y787 w24b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">25<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d1 y787 w41e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">134<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58a h14 y788 ff2 fsd fc7 sc0 ls0 ws0\">159<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y789 w41f h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">31 December 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d2 y789 w420 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">10<span class=\"_ _1\"></span>,025<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d3 y789 w421 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">1,809</div></td><td class=\"t m0 x3ea h14 y78a ff2 fsd fc7 sc0 ls0 ws0\">11<span class=\"_ _4\"></span>,834<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c xf0 y78b w417 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Proceeds from loans and<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">borrowings<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d4 y78c wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d5 y78c w148 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,150<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x591 h14 y78d ff2 fsd fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,150<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y78e w41a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Commitment fee<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5cc y78e wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5cd y78e w92 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">700<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x582 h14 y78f ff2 fsd fc7 sc0 ls0 ws0\">700<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y790 w41c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Converted into capital<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ce y790 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d6 y790 w422 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-9<span class=\"_ _1\"></span>,025</div></td><td class=\"t m0 x5cb h14 y791 ff2 fsd fc7 sc0 ls0 ws0\">-9<span class=\"_ _1\"></span>,025<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c xf0 y792 w423 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Repayment of loans and borro-<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">wings<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d7 y793 w424 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3<span class=\"_ _4\"></span>,605<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d8 y793 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0</div></td><td class=\"t m0 x5cb h14 y794 ff2 fsd fc7 sc0 ls0 ws0\">-3<span class=\"_ _4\"></span>,605<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y795 w41d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>air value adjustment<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d9 y795 w425 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-436<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5da y795 w426 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">426<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x5a6 h14 y796 ff2 fsd fc7 sc0 ls0 ws0\">-10<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y797 w427 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">31 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5db y797 w428 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">5<span class=\"_ _4\"></span>,984<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d3 y797 w429 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">1,060<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x3ef h14 y798 ff2 fsd fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,044<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y799 w117 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Of which current<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5dc y799 w42a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,7<span class=\"_ _1\"></span>49<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5dd y799 w42b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,060<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x3ef h28 y79a ff1 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,809<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y535 w42c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Of which non-current<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5de y535 w105 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3,235<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5df y535 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x3ef h28 y79b ff1 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,235<span class=\"_ _1a9\"> </span></td></tr></table>The Compan<span class=\"_ _4\"></span>y issued convertible bonds since 2021 with two parties as described below:<span class=\"_ _1a9\"> </span>Negma Group Ltd<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On August 26<span class=\"_ _25\"></span>, 2021<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion (the Company or the Issuer) entered into an agreement wher<span class=\"_ _4\"></span>eby Negma as in<span class=\"_ _4\"></span>vestor is willing to subscribe to<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> up to 12,000 zero coupon au<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tomatically convertible bonds with each a nominal value<span class=\"_ _1a9\"> </span>of 2,500 euro<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> in several tranches of minimum 200 and<span class=\"_ _1a9\"> </span>maximum 1<span class=\"_ _4\"></span>,000 bonds for a total committed amount up<span class=\"_ _1a9\"> </span>to 30 million euro<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he Company as issuer contro<span class=\"_ _4\"></span>ls the<span class=\"_ _1a9\"> </span>timing and amount of the tranche calls<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The Investor is entitled to a commitment f<span class=\"_ _4\"></span>ee for an<span class=\"_ _1a9\"> </span>amount equal to up to 3<span class=\"_ _1\"></span>.5% of the total commitment,<span class=\"_ _4\"></span> i.e.,<span class=\"_ _1\"></span> up to 1<span class=\"_ _4\"></span>.050 million euro<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> payable<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> at the option of the Issuer<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> either in cash or in commitment fee convertible bonds<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>50% of the commitment fee is due upon signing of the<span class=\"_ _1a9\"> </span>agreement,<span class=\"_ _1\"></span> the remaining 50% is due only if a tranche call<span class=\"_ _1a9\"> </span>is exercised by the Issuer<span class=\"_ _25\"></span>, as a r<span class=\"_ _4\"></span>esult of which in total half of<span class=\"_ _1a9\"> </span>the commitment will have been called b<span class=\"_ _4\"></span>y the Issuer<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The conver<span class=\"_ _4\"></span>sion price is 92% of the low<span class=\"_ _4\"></span>est closing vol<span class=\"_ _4\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ume-weighted a<span class=\"_ _4\"></span>verage price (VW<span class=\"_ _25\"></span>AP) over a period of<span class=\"_ _1a9\"> </span>15 consecutive trading days expiring on the tr<span class=\"_ _4\"></span>ading day<span class=\"_ _1a9\"> </span>immediately preceding the date of issuance of a con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>version notice<span class=\"_ _4\"></span>. Each convertible bond and commitment<span class=\"_ _1a9\"> </span>fee convertible bond has a duration of tw<span class=\"_ _4\"></span>elve months as<span class=\"_ _1a9\"> </span>from its date of issuance and shall accrue no interest. An<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span>convertible bond and commitment fee convertible bond<span class=\"_ _1a9\"> </span>not converted into shares prior to the maturity date<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> shall<span class=\"_ _1a9\"> </span>convert automatically into shares at maturity date<span class=\"_ _4\"></span>. The<span class=\"_ _1a9\"> </span>Investor has the right to convert all or any of the con<span class=\"_ _4\"></span>vert<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ible bonds and commitment fee con<span class=\"_ _4\"></span>vertible bonds into<span class=\"_ _1a9\"> </span>new shares at an<span class=\"_ _4\"></span>y time.<span class=\"_ _1a9\"> </span>The number of shar<span class=\"_ _4\"></span>es to be issued upon conversion shall<span class=\"_ _1a9\"> </span>be equal to the conversion amount divided b<span class=\"_ _4\"></span>y the appli<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cable conver<span class=\"_ _4\"></span>sion price,<span class=\"_ _1\"></span> provided that it shall not exceed<span class=\"_ _1a9\"> </span>a maximum of 38<span class=\"_ _1\"></span>,291<span class=\"_ _4\"></span>,950 shares<span class=\"_ _4\"></span>. If the Investor does<span class=\"_ _1a9\"> </span>not receive the relevant shar<span class=\"_ _4\"></span>es,<span class=\"_ _1\"></span> the Issuer shall pay to the<span class=\"_ _1a9\"> </span>Investor an amount in cash (<span class=\"ff3 ws105\">\u201cP<span class=\"_ _4\"></span>art A of F<span class=\"_ _4\"></span>unding Program\u201d<span class=\"ff1 ws0\">)<span class=\"_ _1a9\"> </span></span></span>On September 2,<span class=\"_ _4\"></span> 2022,<span class=\"_ _1\"></span> the par<span class=\"_ _3\"></span>ties amended the terms<span class=\"_ _1a9\"> </span>and conditions of part of the funding program (<span class=\"ff3 wsdd\">\u201cPart B\u201d</span><span class=\"ws0\">)<span class=\"_ _1a9\"> </span></span>for an amount of up to 6 million euro of the total com<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mitment through the issuance and subscription of up<span class=\"_ _1a9\"> </span>to 2.400 of the convertible bonds (<span class=\"ff3 ws45\">\u201cPart B Convertible<span class=\"_ _1a9\"> </span></span>bonds<span class=\"_ _4\"></span>\u201d<span class=\"ff1 ws11e\">) through several T<span class=\"_ _25\"></span>ranches<span class=\"ff2 ws0\"> <span class=\"_ _1\"></span><span class=\"ff1\">(<span class=\"ff3 ws103\">\u201cP<span class=\"_ _4\"></span>art B Commitment\u201d<span class=\"ff1 ls1f ws25\">),<span class=\"_ _1a9\"> </span></span></span></span></span></span>to be called by the Issuer at its discr<span class=\"_ _4\"></span>etion over the period<span class=\"_ _1a9\"> </span>between September 2,<span class=\"_ _1\"></span> 2022 up to December 31<span class=\"_ _1\"></span>, 2022<span class=\"_ _1a9\"> </span>(<span class=\"ff3\">\u201cPart B Commitment Period<span class=\"_ _1\"></span>\u201d<span class=\"ff1 ls1f ws25\">).<span class=\"_ _1a9\"> </span></span></span>The initial terms and conditions as set forth in the Issuance<span class=\"_ _1a9\"> </span>and Subscription Agreement remain unc<span class=\"_ _4\"></span>hanged for P<span class=\"_ _4\"></span>art<span class=\"_ _1a9\"> </span>A of the F<span class=\"_ _1\"></span>unding Program. Part A of the F<span class=\"_ _4\"></span>unding Progr<span class=\"_ _4\"></span>am<span class=\"_ _1a9\"> </span>was suspended during the P<span class=\"_ _4\"></span>art B Commitment Period<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Upon expir<span class=\"_ _3\"></span>y of the Part B Commitment Period<span class=\"_ _1\"></span>, P<span class=\"_ _4\"></span>art A<span class=\"_ _1a9\"> </span>of the F<span class=\"_ _1\"></span>unding Program was automatically r<span class=\"_ _4\"></span>eactivated<span class=\"_ _1a9\"> </span>(including that part of the Part B Commitment for which<span class=\"_ _1a9\"> </span>no Part B Convertible bonds shall have been issued and<span class=\"_ _1a9\"> </span>subscribed to during the Part B Commitment Period)<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>or the Part B Commitment,<span class=\"_ _4\"></span> the Investor is entitled to a<span class=\"_ _1a9\"> </span>further waiver and commitment fee equal to 0<span class=\"_ _1\"></span>,7<span class=\"_ _4\"></span> million<span class=\"_ _1a9\"> </span>euro<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> payable in 280 convertible bonds for the Part B<span class=\"_ _1a9\"> </span>Commitment together with the first tranc<span class=\"_ _4\"></span>he of the Part B<span class=\"_ _1a9\"> </span>Commitment .The w<span class=\"_ _4\"></span>aiver and commitment fee convert<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ible bonds have a nominal value of 0<span class=\"_ _25\"></span>,0025 million euro<span class=\"_ _1a9\"> </span>each.<span class=\"_ _1a9\"> </span>The conver<span class=\"_ _4\"></span>sion price of the Part B convertible bonds is<span class=\"_ _1a9\"> </span>80% of the low<span class=\"_ _4\"></span>est closing volume-w<span class=\"_ _4\"></span>eighted aver<span class=\"_ _4\"></span>age<span class=\"_ _1a9\"> </span>price (VW<span class=\"_ _1\"></span>AP) over a period of 15 consecutive tr<span class=\"_ _4\"></span>ading<span class=\"_ _1a9\"> </span>days expiring on the trading day immediately pr<span class=\"_ _4\"></span>eceding<span class=\"_ _1a9\"> </span>the date of issuance of a conversion notice<span class=\"_ _4\"></span>.  Ther<span class=\"_ _4\"></span>e is no<span class=\"_ _1a9\"> </span>liquidity condition or cool down period<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The number of shar<span class=\"_ _4\"></span>es to be issued upon conversion shall<span class=\"_ _1a9\"> </span>be equal to the conversion amount divided b<span class=\"_ _4\"></span>y the appli<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cable conver<span class=\"_ _4\"></span>sion price. T<span class=\"_ _4\"></span>he cap of 38<span class=\"_ _1\"></span>,291,950 shar<span class=\"_ _4\"></span>es is<span class=\"_ _1a9\"> </span>deleted from the terms and conditions of the agreement.<span class=\"_ _1a9\"> </span>The convertible bonds described abo<span class=\"_ _4\"></span>ve meets the defini<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion of a financial liability given that the conversion price<span class=\"_ _1a9\"> </span>is not fixed and upon conversion,<span class=\"_ _1\"></span> will result in a variable<span class=\"_ _1a9\"> </span>number of shares being issued<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> being the nominal amount<span class=\"_ _1a9\"> </span>of the convertible loan divided by the con<span class=\"_ _4\"></span>version price. T<span class=\"_ _4\"></span>he<span class=\"_ _1a9\"> </span><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws4b gs88\">convertible bond is also a derivative financial liability as the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws10e gs89\">conversion featur<span class=\"_ _4\"></span>e is an embedded derivative of the loan </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb9 gs56\">host. The host and the derivative will not be separated and </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs57\">are accounted for as one h<span class=\"_ _4\"></span>ybrid financial liability<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wscc gs5a\">The financial liability is measured at f<span class=\"_ _4\"></span>air value through </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws38 gs5b\">profit or loss<span class=\"_ _4\"></span>. The initial fair value of the convertible loan </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws188 gs8a\">equals an amount of cash received in the amount of <span class=\"_ _18d\"></span><span class=\"ws0\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws5b gs8b\">9<span class=\"_ _1\"></span>.650 million euro of which 2.5 million euro w<span class=\"_ _4\"></span>as received </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf2 gs8c\">in 2021 and 7<span class=\"_ _25\"></span>.150 million euro was received in 2022 </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb0 gs5e\">(5 million euro P<span class=\"_ _4\"></span>art A and 4.650 million euro P<span class=\"_ _4\"></span>art B)<span class=\"_ _4\"></span>. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1c9 gs5f\">A total of 1<span class=\"_ _4\"></span>.350 million euro w<span class=\"_ _4\"></span>as already con<span class=\"_ _4\"></span>verted into </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1c9 gs173\">shares befor<span class=\"_ _4\"></span>e December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _4\"></span>. During 2022 another </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws12f gs24d\">9<span class=\"_ _1\"></span>.025 million euro has been converted into shares befor<span class=\"_ _4\"></span>e </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws102 gs65\">December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> fo<span class=\"_ _4\"></span>llowing the conver<span class=\"_ _4\"></span>sion of (in </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs66\">aggregate) 3<span class=\"_ _4\"></span>.610 convertible bonds that w<span class=\"_ _4\"></span>ere issued<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws2a gsa8\">Subsequently<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> the fair value of the convertible loan related </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws33 gs6a\">to the Part A convertible bonds as per December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa8 gs6c\">is determined as the nominal amount of the convertible </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws88 gs6e\">loan plus 8%. The 8% r<span class=\"_ _4\"></span>epresents the differ<span class=\"_ _4\"></span>ence between </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws72 gs6f\">the share price and the 92% of the lo<span class=\"_ _4\"></span>west closing VW<span class=\"_ _25\"></span>AP<span class=\"_ _25\"></span>. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1c4 gsa9\">Given the volatility of the share prices as per y<span class=\"_ _4\"></span>ear ending </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1c4 gs71\">December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> the fair value of the con<span class=\"_ _4\"></span>vertible loan </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsba gs73\">related to the P<span class=\"_ _4\"></span>art B Conver<span class=\"_ _3\"></span>tible bonds is based on the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws261 gs96\">intrinsic value approach. Considering the term of the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa3 gsaa\">convertible loan to be less than twelve months<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> no option </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1b0 gs98\">pricing model is used<span class=\"_ _4\"></span>. The outstanding con<span class=\"_ _4\"></span>vertible loan has </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1aa gsf\">a nominal value of 0<span class=\"_ _1\"></span>.5 million euro as per 3<span class=\"_ _4\"></span>1 December </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws9c gs78\">2022 and the fair value is determined at 1<span class=\"_ _4\"></span>.06 million euro </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa9 gs79\">with changes in the fair value r<span class=\"_ _4\"></span>ecorded in profit and loss </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws195 gs7a\">as fair value gains and losses on the convertible loan.<span class=\"ws0\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws13b gs12\">The fair value loss in the amount of 0<span class=\"_ _25\"></span>.426 million euro </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws121 gs13\">as per December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> is inc<span class=\"_ _4\"></span>luded in the line item </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws128 gs7d\">\u2018F<span class=\"_ _4\"></span>inance expense\u2019 in the consolidated statement of profit </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs14\">and loss.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws3f gs18\">The fair value of the con<span class=\"_ _4\"></span>verted bonds during 2022 was </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws2c gs19\">16<span class=\"_ _1\"></span>.423 million euro<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he difference betw<span class=\"_ _4\"></span>een the fair value </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf3 gs1a\">and the nominal amount was r<span class=\"_ _4\"></span>ecorded in profit and loss </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws89 gs1b\">as fair value loss included in the line finance expense f<span class=\"_ _4\"></span>or </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws79 gs59\">an amount of 7<span class=\"_ _25\"></span>.824 million euro and 0<span class=\"_ _25\"></span>.426 million euro in </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs1c\">other reser<span class=\"_ _3\"></span>ves upon conversion.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wse9 gs1e\">Upon conversion,<span class=\"_ _1\"></span> the financial liability measured at fair </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws46 gs1f\">value at date of conversion will be r<span class=\"_ _4\"></span>eclassified to share<span class=\"_ _4\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs8d\">holders<span class=\"_ _4\"></span>\u2019 equity<span class=\"_ _25\"></span>. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws36 gs60\">The liability for the first instalment of the P<span class=\"_ _4\"></span>art A commit<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa3 gs8e\">ment fee of 0<span class=\"_ _1\"></span>.525 million euro (50% upon signing of the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws18f gs23\">agreement) is made once the first T<span class=\"_ _25\"></span>ranche Call is called </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws107 gsb1\">by the Compan<span class=\"_ _4\"></span>y<span class=\"_ _25\"></span>. The commitment fee is recorded in </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws127 gs90\">profit and loss as transaction cost due<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> given the Company </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws20f gs26\">cannot avoid cash settlement if the Investor r<span class=\"_ _4\"></span>equests </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1f5 gs69\">eventual payment in cash. These transaction costs ar<span class=\"_ _4\"></span>e </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws88 gs6b\">included in the line item \u2018F<span class=\"_ _4\"></span>inance expense\u2019 in the consoli<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs6d\">dated statement of profit and loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws100 gs93\">The second instalment of the P<span class=\"_ _4\"></span>art A commitment fee of </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsda gs94\">0<span class=\"_ _1\"></span>.525 million euro is recognized if and only if a tr<span class=\"_ _4\"></span>anche </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1c4 gs72\">call is exercised by the Issuer<span class=\"_ _25\"></span>, as a r<span class=\"_ _4\"></span>esult of which in total </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws74 gs2e\">more than half of the total commitment will have been </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1b gs74\">called<span class=\"_ _4\"></span>. This commitment f<span class=\"_ _4\"></span>ee is considered as a transaction </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws9a gs76\">cost in accordance with IFRS 9 and expensed as incurred </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws46 gs77\">as financial expense,<span class=\"_ _1\"></span> given it is an incremental cost that </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws5b gs31\">the Company w<span class=\"_ _4\"></span>ould not incur if the triggering condition is </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws72 gs32\">not met. This second instalment has not been accounted </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws87 gs33\">for as per December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022, since ther<span class=\"_ _4\"></span>e is no present </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs9b\">obligation y<span class=\"_ _4\"></span>et.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws2b gs7c\">The P<span class=\"_ _4\"></span>art B waiver and commitment fee of 0<span class=\"_ _1\"></span>.7<span class=\"_ _4\"></span> million euro </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws21 gs7e\">payable in 280 convertible bonds with a nominal value of </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws13b gs7f\">0<span class=\"_ _1\"></span>.0025 million euro became due upon the payment of </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsdd gs9e\">the first tranc<span class=\"_ _4\"></span>he under Part B pursuant to the addendum </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws93 gs11c\">and is recorded as financial expense in the consolidated </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws22 gs84\">statement of profit and loss given these are consider<span class=\"_ _4\"></span>ed as<span class=\"_ _1a9\"> </span></div>transactions costs<span class=\"_ _4\"></span>. The corr<span class=\"_ _4\"></span>esponding liability is measured<span class=\"_ _1a9\"> </span>at fair value through profit and loss<span class=\"_ _4\"></span>. Upon conversion the<span class=\"_ _1a9\"> </span>financial liability measured at fair value at the date of con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>version,<span class=\"_ _4\"></span> will be r<span class=\"_ _4\"></span>eclassified to shar<span class=\"_ _4\"></span>eholders equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>Kreos Capital / P<span class=\"_ _4\"></span>ontifax V<span class=\"_ _1\"></span>entures<span class=\"_ _1a9\"> </span>On November 21<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> Oxurion (the Company or the<span class=\"_ _1a9\"> </span>Issuer) entered into the Loan F<span class=\"_ _1\"></span>acility whereb<span class=\"_ _4\"></span>y Kreos<span class=\"_ _1a9\"> </span>Capital VI Limited together with Pontif<span class=\"_ _4\"></span>ax Medison<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inance L.P<span class=\"_ _25\"></span>. (the Investor<span class=\"_ _4\"></span>s) as investors are willing to<span class=\"_ _1a9\"> </span>subscribe to convertible bonds with each a nominal value<span class=\"_ _1a9\"> </span>of 0<span class=\"_ _1\"></span>.1 million euro<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> in an amount of 10<span class=\"_ _1\"></span>.0 million euro<span class=\"_ _4\"></span>. <span class=\"_ _18d\"></span><span class=\"ws0\"> </span>The Investor<span class=\"_ _4\"></span>s are entitled to a transaction fee of 0<span class=\"_ _25\"></span>.125<span class=\"_ _1a9\"> </span>million euro and an end of loan payment equal to 3<span class=\"_ _1\"></span>.5%<span class=\"_ _1a9\"> </span>that shall accrue on the amount dra<span class=\"_ _4\"></span>wn under each tranc<span class=\"_ _4\"></span>he.<span class=\"_ _1a9\"> </span>The convertible bonds accrue inter<span class=\"_ _4\"></span>est in the amount of<span class=\"_ _1a9\"> </span>7<span class=\"_ _25\"></span>.95% per year<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The convertible bonds may be either:<span class=\"_ _1a9\"> </span>1.<span class=\"_ _3\"></span> <span class=\"_ _62\"> </span><span class=\"ls0 ws172\">Converted in shares at the option of the Investors at<span class=\"_ _1a9\"> </span></span>any time<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>2. <span class=\"_ _109\"> </span><span class=\"ws159\">Converted in shares at the option of the Issuer when<span class=\"_ _1a9\"> </span></span>certain conditions are met.<span class=\"_ _1a9\"> </span>3.<span class=\"_ _23\"></span> <span class=\"_ _10a\"> </span><span class=\"ls0 wsc2\">Repaid based on the amortization schedule without<span class=\"_ _1a9\"> </span></span>extension.<span class=\"_ _1a9\"> </span>4.<span class=\"_ _3\"></span> <span class=\"_ _109\"> </span><span class=\"ls0 ws234\">Repaid based on the amor<span class=\"_ _3\"></span>tization schedule with<span class=\"_ _1a9\"> </span></span>extension.<span class=\"_ _1a9\"> </span>5.<span class=\"_ _23\"></span> <span class=\"_ _109\"> </span><span class=\"ls0 ws0\">Prepaid when cer<span class=\"_ _3\"></span>tain conditions are met.<span class=\"_ _1a9\"> </span></span>6.<span class=\"_ _23\"></span> <span class=\"_ _10a\"> </span><span class=\"ls0 ws8c\">P<span class=\"_ _4\"></span>aid in full in case of events of default or change in<span class=\"_ _1a9\"> </span></span>control.<span class=\"_ _1a9\"> </span>The number of shar<span class=\"_ _4\"></span>es to be issued upon conversion shall<span class=\"_ _1a9\"> </span>be equal to the conversion amount divided b<span class=\"_ _4\"></span>y the applica<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ble conver<span class=\"_ _4\"></span>sion price:<span class=\"_ _1a9\"> </span>1.<span class=\"_ _3\"></span> <span class=\"_ _62\"> </span><span class=\"ls0 wsc8\">The initial conver<span class=\"_ _4\"></span>sion price of the Bonds was equal to<span class=\"_ _1a9\"> </span></span>2.90 euro<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>2. <span class=\"_ _109\"> </span><span class=\"ws9d\">The con<span class=\"_ _4\"></span>version price may be adjusted from time to<span class=\"_ _1a9\"> </span></span>time upon the occurrence of corpor<span class=\"_ _4\"></span>ate actions,<span class=\"_ _1\"></span> such<span class=\"_ _1a9\"> </span>as merger<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> demerger<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> stoc<span class=\"_ _4\"></span>k splits or reverse stoc<span class=\"_ _4\"></span>k split,<span class=\"_ _1\"></span> in accordance with the adjustment policy set out in the<span class=\"_ _1a9\"> </span>Euronext Corporate Action P<span class=\"_ _4\"></span>olicy<span class=\"_ _1a9\"> </span>3.<span class=\"_ _23\"></span> <span class=\"_ _10a\"> </span><span class=\"ls0 ws25\">In the event that,<span class=\"_ _1\"></span> between the issue date of the Kreos<span class=\"_ _1a9\"> </span></span>Bonds and the date falling twelve months after the<span class=\"_ _1a9\"> </span>Loan F<span class=\"_ _1\"></span>acility (i.e. 22 No<span class=\"_ _4\"></span>vember 2022,<span class=\"_ _4\"></span> the Compan<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span>issued any shar<span class=\"_ _4\"></span>es in the context of an equity financing<span class=\"_ _1a9\"> </span>at an issue price per share which r<span class=\"_ _4\"></span>epresents a<span class=\"_ _1a9\"> </span>discount of more than 20% to the VW<span class=\"_ _25\"></span>AP (volume-<span class=\"ws0\"> </span>weighted a<span class=\"_ _4\"></span>verage price) over the thirty trading days<span class=\"_ _1a9\"> </span>period preceding the date of such issuance of shar<span class=\"_ _4\"></span>es,<span class=\"_ _1\"></span> the Kreos Conver<span class=\"_ _4\"></span>sion Price shall be adjusted to 140%<span class=\"_ _1a9\"> </span>of the average issue price of all shar<span class=\"_ _4\"></span>es issued by the<span class=\"_ _1a9\"> </span>Company in the context of an<span class=\"_ _4\"></span>y equity financing since<span class=\"_ _1a9\"> </span>the issue date of the Kreos Bonds (if lo<span class=\"_ _4\"></span>wer than the<span class=\"_ _1a9\"> </span>Kreos Conver<span class=\"_ _4\"></span>sion Price)<span class=\"_ _4\"></span>. As a result,<span class=\"_ _1\"></span> the strike price<span class=\"_ _1a9\"> </span>was r<span class=\"_ _4\"></span>eset at 0<span class=\"_ _1\"></span>.28 euro per share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On June 21<span class=\"_ _1\"></span>, 2022,<span class=\"_ _1\"></span> the Company<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> Kreos Capital VI<span class=\"_ _1a9\"> </span>Limited and Pontif<span class=\"_ _4\"></span>ax Medison F<span class=\"_ _4\"></span>inance L.P<span class=\"_ _25\"></span>. executed an<span class=\"_ _1a9\"> </span>amendment to the convertible bond facility<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> pursuant<span class=\"_ _1a9\"> </span>to which a repayment of 3<span class=\"_ _1\"></span>.0 million euro (30%) of the<span class=\"_ _1a9\"> </span>principal amount (excluding capitalized interest) of the<span class=\"_ _1a9\"> </span>first tranc<span class=\"_ _4\"></span>he of 10<span class=\"_ _1\"></span>.0 million euro was made<span class=\"_ _4\"></span>. As part of the<span class=\"_ _1a9\"> </span>amendment,<span class=\"_ _4\"></span> it w<span class=\"_ _4\"></span>as agreed that the cash co<span class=\"_ _4\"></span>venant would<span class=\"_ _1a9\"> </span>be reduced from 4<span class=\"_ _4\"></span>.0 million euro to 3<span class=\"_ _1\"></span>.0 million euro<span class=\"_ _1\"></span>, the<span class=\"_ _1a9\"> </span>repayment schedule w<span class=\"_ _4\"></span>as revised and the inter<span class=\"_ _4\"></span>est only<span class=\"_ _1a9\"> </span>period was extended to September 30<span class=\"_ _25\"></span>, 2022. A<span class=\"_ _4\"></span>t the same<span class=\"_ _1a9\"> </span>time,<span class=\"_ _1\"></span> Kreos/Pontif<span class=\"_ _4\"></span>ax agreed not exercise an<span class=\"_ _4\"></span>y rights they<span class=\"_ _1a9\"> </span>might have had to reco<span class=\"_ _4\"></span>ver amounts ow<span class=\"_ _4\"></span>ed to them under<span class=\"_ _1a9\"> </span>the Loan Agreement pro<span class=\"_ _4\"></span>vided that certain conditions are<span class=\"_ _1a9\"> </span>met,<span class=\"_ _4\"></span> the fulfilment of whic<span class=\"_ _4\"></span>h is uncertain.<span class=\"_ _1a9\"> </span>The convertible bond described abo<span class=\"_ _4\"></span>ve meets the definition<span class=\"_ _1a9\"> </span>of a financial liability given that the Company cannot a<span class=\"_ _4\"></span>void<span class=\"_ _1a9\"> </span>delivering cash to the investors and the con<span class=\"_ _4\"></span>version price<span class=\"_ _1a9\"> </span>is not fixed<span class=\"_ _4\"></span>. The Compan<span class=\"_ _4\"></span>y cannot avoid delivering cash as<span class=\"_ _1a9\"> </span>they do not have control o<span class=\"_ _4\"></span>ver the different scenarios<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he<span class=\"_ _1a9\"> </span>conversion price can also c<span class=\"_ _4\"></span>hange upon certain scenario\u2019<span class=\"_ _1\"></span>s<span class=\"_ _1a9\"> </span><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wse1 gs261\">as described above and as suc<span class=\"_ _4\"></span>h the number of shares </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws10e gs262\">being issued will var<span class=\"_ _3\"></span>y based on the conversion price<span class=\"_ _4\"></span>. The </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws4b gs263\">convertible bond is also a derivative financial liability as the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws10e gs264\">conversion featur<span class=\"_ _4\"></span>e is an embedded derivative of the loan </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs265\">host. The host and the derivative will not be separated<span class=\"_ _1\"></span>. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wscc gs266\">The financial liability is measured at f<span class=\"_ _4\"></span>air value through </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa8 gs267\">profit or loss<span class=\"_ _4\"></span>. In determining the fair value,<span class=\"_ _1\"></span> the company </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1aa gs268\">makes certain judgements on the valuation model to be </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws105 gs269\">applied and the probability that certain scenarios will occur </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws183 gs26a\">or not in the future<span class=\"_ _4\"></span>. The fair value of the con<span class=\"_ _4\"></span>vertible bonds </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws52 gs26b\">has been measured considering the follo<span class=\"_ _4\"></span>wing scenarios </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs26c\">that may impact the term of the bond:<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls1f ws25 gs26d\">1.<span class=\"_ _3\"></span> <span class=\"_ _62\"> </span><span class=\"ls0 ws0\">No extension<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs26e\">2. <span class=\"_ _109\"> </span>With extension<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls2b ws142 gs26f\">3.<span class=\"_ _23\"></span> <span class=\"_ _10a\"> </span><span class=\"ls0 ws0\">Pr<span class=\"_ _4\"></span>epaid when certain conditions are met.<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls55 ws2c gs270\">4.<span class=\"_ _3\"></span> <span class=\"_ _109\"> </span><span class=\"ls0 ws8c\">Paid in full in case of events of default or change in </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs271\">control.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws164 gs272\">The initial fair value of the con<span class=\"_ _4\"></span>vertible loan equals the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws61 gs273\">amount of cash received which is 10<span class=\"_ _25\"></span>.0 million euro as </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws12f gs274\">per December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _4\"></span>. Subsequently the f<span class=\"_ _4\"></span>air value is de<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws74 gs275\">termined as the probability weighted a<span class=\"_ _4\"></span>verage of the fair </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws5a gs276\">values of the different scenarios described abo<span class=\"_ _4\"></span>ve consid<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws96 gs277\">ering the pre-payment agreed on J<span class=\"_ _4\"></span>une 21<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022. The fair </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws9b gs278\">value of the scenarios has been determined by app<span class=\"_ _4\"></span>lication </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf0 gs279\">of the effective interest r<span class=\"_ _4\"></span>ate method and the Black<span class=\"_ _1\"></span>-Scholes </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsd6 gs27a\">model. The payment b<span class=\"_ _4\"></span>y the Company to P<span class=\"_ _4\"></span>ontifax Medison </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb8 gs27b\">F<span class=\"_ _4\"></span>inance L.P is paid in USD b<span class=\"_ _4\"></span>y converting the relevant due </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws177 gs27c\">amount in euro into the USD at a fixed exchange r<span class=\"_ _4\"></span>ate. F<span class=\"_ _1\"></span>or </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb7 gs27d\">Pontif<span class=\"_ _4\"></span>ax,<span class=\"_ _4\"></span> the fair value of the con<span class=\"_ _4\"></span>vertible loan is deter<span class=\"_ _4\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf5 gs27e\">mined based on the application of the effective inter<span class=\"_ _4\"></span>est </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws66 gs27f\">rate method considering the USD loan payment at the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs280\">spot rate at valuation date<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb4 gs281\">The abo<span class=\"_ _4\"></span>ve fair value measurement is a level 3 as a r<span class=\"_ _4\"></span>esult </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa9 gs282\">of the unobser<span class=\"_ _3\"></span>vable input for the probabilities<span class=\"_ _4\"></span>. A reason<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsdc gs283\">able change of the pr<span class=\"_ _4\"></span>obabilities between the differ<span class=\"_ _4\"></span>ent sce<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf6 gs284\">nario<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s would not lead to a material c<span class=\"_ _4\"></span>hange in the fair value<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws172 gs285\">The fair value as per December 3<span class=\"_ _4\"></span>1<span class=\"_ _1\"></span>, 2022,<span class=\"_ _1\"></span> is determined </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws18f gs286\">at 5<span class=\"_ _1\"></span>.984 million euro<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> taking into account the repayment </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws3b gs287\">of 3 million euro<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> with changes in the fair value recorded </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws137 gs288\">in profit and loss as fair value gains and losses on the con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws18f gs289\">vertible loan. The fair value gain in the amount of 0<span class=\"_ _1\"></span>.436 </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws162 gs28a\">million euro as per December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022, ar<span class=\"_ _4\"></span>e included in the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws80 gs28b\">line item \u2018F<span class=\"_ _4\"></span>inance income\u2019 in the consolidated statement of </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsbb gs28c\">profit and loss<span class=\"_ _4\"></span>. No amounts have already been con<span class=\"_ _4\"></span>verted </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs28d\">into shares as per December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wse9 gs28e\">Upon conversion,<span class=\"_ _1\"></span> the financial liability measured at fair </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws46 gs28f\">value at date of conversion will be r<span class=\"_ _4\"></span>eclassified to share<span class=\"_ _4\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws155 gs290\">holders<span class=\"_ _4\"></span>\u2019 equity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> being shar<span class=\"_ _4\"></span>e capital and share premium and </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs291\">other reser<span class=\"_ _3\"></span>ves for the fair value adjustment portion. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws10a gs292\">The Loan F<span class=\"_ _1\"></span>acility is subject to a financial covenant wher<span class=\"_ _4\"></span>eby </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws76 gs293\">the Group is requir<span class=\"_ _4\"></span>ed to maintain at all times a minimum </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws9b gs294\">aggregate amount of cash in the bank of an amount equal </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws158 gs295\">to the low<span class=\"_ _4\"></span>er of 3 million euro and the principal amount </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws149 gs296\">outstanding. The Group has comp<span class=\"_ _4\"></span>lied with the financial </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs297\">covenant at December 3<span class=\"_ _4\"></span>1<span class=\"_ _1\"></span>, 202<span class=\"_ _1a9\"> </span>2<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 hd ff3 fs8 fc4 sc0 ls22 ws122 gs298\">5.7<span class=\"_ _25\"></span>.<span class=\"_ _4\"></span>12 <span class=\"_ _60\"> </span><span class=\"ls0 ws0\">Deferr<span class=\"_ _4\"></span>ed taxes<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws18f gs299\">Deferred tax assets ha<span class=\"_ _4\"></span>ve not been recognized in respect </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws4f gs29a\">of the items below because it is not probab<span class=\"_ _4\"></span>le that future </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws46 gs29b\">taxable profits will be a<span class=\"_ _4\"></span>vailable against which the Gr<span class=\"_ _4\"></span>oup </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws165 gs29c\">can utilize the loss carr<span class=\"_ _3\"></span>yfor<span class=\"_ _3\"></span>wards or deductible tempor<span class=\"_ _4\"></span>ar<span class=\"_ _3\"></span>y </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1e9 gs29d\">differences<span class=\"_ _4\"></span>. The losses a<span class=\"_ _4\"></span>vailable for offsetting futur<span class=\"_ _4\"></span>e </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs29e\">taxable income are mainl<span class=\"_ _4\"></span>y related to Belgium.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h14 ff2 fsd fc7 sc0 ls0 ws0 gs29f\">In '000 euro (as at 31 December)<span class=\"_ _18e\"> </span>2022<span class=\"_ _ba\"> </span>2021<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs2a0\">Losses available for offsetting against </div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs2a1\">future taxable income<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs2a2\">361<span class=\"_ _4\"></span>,140<span class=\"_ _3a\"> </span>342,145<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs2a3\">Deductible temporary differences<span class=\"_ _57\"> </span>18<span class=\"_ _4\"></span>,056<span class=\"_ _16\"> </span>24,518<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs2a4\">T<span class=\"_ _1\"></span>axable temporary differences<span class=\"_ _18f\"> </span>0<span class=\"_ _83\"> </span>-46<span class=\"_ _1a9\"> </span></div><table class=\"s w43f h75\" id=\"_1a33e15b-2a3b-4601-a971-47523a3b9a18\"><tr><td class=\"t m2 x12d h1d y7af ff2 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal unused tax losses and other </td><td></td><td></td></tr><tr><td class=\"t m2 x12d h1d y7b0 ff2 fsc fc7 sc0 ls0 ws0\">deductible temporary differences not </td><td class=\"c n x360 y7b1 w440 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">379<span class=\"_ _4\"></span>,196<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5f9 y7b1 w440 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">366<span class=\"_ _4\"></span>,617<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h1d y7b2 ff2 fsc fc7 sc0 ls0 ws0\">recognized<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr></table>No deferred tax liability is r<span class=\"_ _4\"></span>ecognized on the unremitted earnings of subsidiaries since no tax is expected to be payable on them in the for<span class=\"_ _4\"></span>eseeable future<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.8<span class=\"_ _3\"></span> <span class=\"_ _b\"> </span><span class=\"ls10 ws14\">OTHER CL<span class=\"_ _3\"></span>ARIFIC<span class=\"_ _3\"></span>A<span class=\"_ _25\"></span>TIO<span class=\"_ _3\"></span>N N<span class=\"_ _3\"></span>OTES </span>T<span class=\"_ _4\"></span>O THE ST<span class=\"_ _0\"></span>A<span class=\"_ _1\"></span>TE<span class=\"_ _4\"></span>MENT OF FINANCIAL POSIT<span class=\"_ _4\"></span>ION<span class=\"_ _1a9\"> </span>Subsidiaries and branches<span class=\"_ _1a9\"> </span><table class=\"s w439 h74\" id=\"_7abb5478-3daf-41e2-b2a4-49c8da27a28b\"><tr><td class=\"t m1 x34d h12 y7a5 ff3 fsb fc7 sc0 ls1b ws0\">NAME OF THE </td><td class=\"t m1 x3eb h12 y7a6 ff3 fsb fc7 sc0 ls1b ws0\" colspan=\"2\">PLACE OF <span class=\"_ _0\"></span><span class=\"ls0\"> </span></td><td></td><td class=\"t m1 x4a7 h12 y7a5 ff3 fsb fc7 sc0 ls1b wsbe\">PRINCIP<span class=\"_ _4\"></span>AL </td></tr><tr><td class=\"t m1 x34d h12 y7a7 ff3 fsb fc7 sc0 ls1b wsbe\">SUBSIDIARY<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x5ed h12 y7a8 ff3 fsb fc7 sc0 ls1b wsbe\">INCORPORA<span class=\"_ _1\"></span>TION<span class=\"_ _3\"></span> </td><td class=\"c n x5d7 y7a9 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ee y7a9 w1b7 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021</div></td><td class=\"t m1 x5ef h12 y7a7 ff3 fsb fc7 sc0 ls1b wsbe\">ACTIVITY<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td class=\"t m1 x5f0 h12 y7aa ff3 fsb fc7 sc0 ls1b ws0\">AND OPERA<span class=\"_ _1\"></span>TION<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c xf0 y7ab w43a h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Thrombo-<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Genics,<span class=\"_ _4\"></span> Inc.<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5f1 y7ac w23c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">US<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5f2 y7ac w43b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">100%<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5f3 y7ac w43b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">100%<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5f4 y7ac w43c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Distributor<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x34d h13 y7ad ff1 fsc fc7 sc0 ls0 ws0\">Oncurious </td><td class=\"c n x5f5 y61b w43d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">BE<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5f6 y61b w43b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">100%<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5f7 y61b w43e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">83<span class=\"_ _4\"></span>.34%</div></td><td class=\"t m2 x4a7 h13 y7ad ff1 fsc fc7 sc0 ls0 ws0\">Research </td></tr><tr><td class=\"t m2 x34d h13 y7ae ff1 fsc fc7 sc0 ls0 ws0\">NV<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td class=\"t m2 x5f8 h13 y7ae ff1 fsc fc7 sc0 ls0 ws0\">(oncology)<span class=\"_ _1a9\"> </span></td></tr></table>At y<span class=\"_ _4\"></span>ear<span class=\"_ _1\"></span>-end 2021<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> out of a new total of 12,111 shares in the share capital of Oncurious,<span class=\"_ _1\"></span> Oxurion owned 10<span class=\"_ _1\"></span>,093 shares or 83<span class=\"_ _1\"></span>.34%. Due to a capital increase in Oncurious b<span class=\"_ _4\"></span>y VIB through a contribution in kind of a receivab<span class=\"_ _4\"></span>le from VIB to Oncurious for 86<span class=\"_ _1\"></span>,299 euro<span class=\"_ _1\"></span>, VIB\u2019<span class=\"_ _25\"></span>s non-controlling interest increased with 0<span class=\"_ _1\"></span>.5 million euro and the equity attributab<span class=\"_ _4\"></span>le to equity holders of the compan<span class=\"_ _4\"></span>y decreased with 0<span class=\"_ _1\"></span>.5 million euro<span class=\"_ _1\"></span>. The effect of whic<span class=\"_ _4\"></span>h is presented in the line item \u2018trans<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>actions with non-controlling interests<span class=\"_ _1\"></span>\u2019 in the statement of changes in equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>In the line item \u2018transactions with non-controlling inter<span class=\"_ _4\"></span>ests<span class=\"_ _4\"></span>\u2019 presented in the statement of changes in equity<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> the effect of the transfer betw<span class=\"_ _4\"></span>een equity attributab<span class=\"_ _4\"></span>le to equity holders of the compan<span class=\"_ _4\"></span>y and the non-controlling interest is presented resulting fr<span class=\"_ _4\"></span>om the exercise of the call option by VIB leading to the tr<span class=\"_ _4\"></span>ansfer of 680 shares in the share capital of Oncurious from Oxurion to VIB<span class=\"_ _4\"></span>. W<span class=\"_ _1\"></span>e refer to note 5<span class=\"_ _1\"></span>.8 under the heading Flanders Institute for Biotechnolog<span class=\"_ _3\"></span>y for more information on the exer<span class=\"_ _4\"></span>cise of the call options which w<span class=\"_ _4\"></span>ere granted b<span class=\"_ _4\"></span>y Oxurion to VIB<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On December 14<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _1\"></span> Oxurion purchased 2,018 shares from VIB for 1 euro<span class=\"_ _1\"></span>. As of this date,<span class=\"_ _4\"></span> the o<span class=\"_ _4\"></span>wnership of the shares transf<span class=\"_ _4\"></span>erred and Oxurion o<span class=\"_ _4\"></span>wned 12,111 shares or 100%<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span><div class=\"t m0 h17 ff8 fs9 fc7 sc0 ls0 ws0 gs58\">Key Agreements,<span class=\"_ _1\"></span> Commitments and Contingent </div><div class=\"t m0 h17 ff8 fs9 fc7 sc0 ls0 ws0 gs5a\">Liabilities<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws7f gs8a\">In addition to the convertible loan agreements described </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws153 gs8b\">in the preceding section,<span class=\"_ _1\"></span> the Group has a number of other </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws0 gs8c\">material agreements with third parties. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws3a gs5f\">Please find below an o<span class=\"_ _4\"></span>ver<span class=\"_ _3\"></span>view of Oxurion\u2019<span class=\"_ _25\"></span>s material agree<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws96 gs173\">ments. An agr<span class=\"_ _4\"></span>eement is considered as \u201cmaterial<span class=\"_ _4\"></span>\u201d when the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws1b5 gs24d\">contractual commitments reac<span class=\"_ _4\"></span>h over 1 million euro<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> or in </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws62 gs174\">case of a new agreement,<span class=\"_ _1\"></span> when such an impact is expected </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws0 gs175\">in the twelve-month period after the r<span class=\"_ _4\"></span>eporting date.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws86 gs177\">Note that certain agreements may include sharing of R&amp;D </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws178 gs6a\">costs and/or sharing of revenue<span class=\"_ _4\"></span>. Although these agreements </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws8e gs6c\">may include the establishment of a joint committee whic<span class=\"_ _4\"></span>h </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws6e gs6e\">monitors the joint activities,<span class=\"_ _1\"></span> these arrangements are out of </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws120 gs6f\">the scope of IFRS 11 \u201cJoint Arr<span class=\"_ _4\"></span>angements<span class=\"_ _4\"></span>\u201d,<span class=\"_ _4\"></span> as the Compan<span class=\"_ _4\"></span>y </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws72 gsa9\">has concluded that no joint control exists<span class=\"_ _4\"></span>. The main indica<span class=\"_ _4\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws177 gs71\">tors found in the multip<span class=\"_ _4\"></span>le arrangements that resulted in the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws62 gs73\">conclusion that Oxurion has control o<span class=\"_ _4\"></span>ver the operations and </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws127 gs96\">relevant activities and theref<span class=\"_ _4\"></span>ore is the decision-making party </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws0 gsaa\">in the agreements are as f<span class=\"_ _4\"></span>ollows:<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsf\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws265\">Oxurion has sole and exclusive decision-making </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws180 gs99\">authority on the development activities,<span class=\"_ _1\"></span> including but </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs9a\">not limited to the development plan.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs7a\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws72\">Oxurion bears the costs and expenses for all activities </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs9c\">under the development plan.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs13\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws1a1\">Oxurion is responsible for preparing,<span class=\"_ _1\"></span> filing and main<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs9d\">taining regulator<span class=\"_ _3\"></span>y approvals<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs14\">\u2022 <span class=\"_ _62\"> </span><span class=\"wsa4\">Oxurion has the sole responsibility and decision-mak<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsc5 gs2a6\">ing authority for manufacturing and commercialization.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs16\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws1d\">Oxurion shall be the sole and exclusive owner of all </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs2a7\">intellectual property in most agreements<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h17 ff8 fs9 fc7 sc0 ls0 ws0 gs59\">Research and Development Agr<span class=\"_ _4\"></span>eements<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs102\">Bicycle Ther<span class=\"_ _4\"></span>apeutics<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws96 gs1f\">In August 2013<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion entered into a resear<span class=\"_ _4\"></span>ch collabor<span class=\"_ _4\"></span>a<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 wse7 gs8d\">tion and license agreement with Bicy<span class=\"_ _4\"></span>cle Ther<span class=\"_ _4\"></span>apeutics (the </div><div class=\"t m1 he ff3 fs9 fc7 sc0 ls25 ws162 gs20\">\u201cBicyc<span class=\"_ _4\"></span>le Collaboration Agreement\u201d<span class=\"ff1 ws34\">)<span class=\"_ _1\"></span>. Under this agreement,<span class=\"_ _4\"></span> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws183 gs60\">Bicyc<span class=\"_ _4\"></span>le is responsible for identifying Bicy<span class=\"_ _4\"></span>cle-peptides r<span class=\"_ _4\"></span>elated </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 wsac gs8e\">to the collaboration target,<span class=\"_ _1\"></span> human plasma kallikrein,<span class=\"_ _1\"></span> for use<span class=\"_ _3\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws88 gs23\">in various indications. Oxurion is r<span class=\"_ _4\"></span>esponsible for further de<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws1c gs11b\">velopment and product commercialization after the defined </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws0 gs17d\">researc<span class=\"_ _4\"></span>h screening is performed by Bicyc<span class=\"_ _4\"></span>le<span class=\"_ _4\"></span>. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws10c gs2a8\">The collabor<span class=\"_ _4\"></span>ation includes two stages<span class=\"_ _4\"></span>. During Stage 1<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> which </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws1ff gs6b\">has been completed<span class=\"_ _1\"></span>, Bicy<span class=\"_ _4\"></span>cle w<span class=\"_ _4\"></span>as obligated to perform </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws14d gs6d\">specific researc<span class=\"_ _4\"></span>h activities in accordance with the researc<span class=\"_ _4\"></span>h </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws17e gs2a\">plan focused on scr<span class=\"_ _4\"></span>eening the target using the Bicyc<span class=\"_ _4\"></span>le </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws91 gs93\">platform to identify compounds that meet the criteria set </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 wsde gs94\">by the parties. During Stage 2,<span class=\"_ _1\"></span> which is ongoing,<span class=\"_ _4\"></span> Oxurion has </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws66 gs72\">continued researc<span class=\"_ _4\"></span>h activities on selected Bicyc<span class=\"_ _4\"></span>le-peptides </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 wsd9 gs2e\">with the goal of identifying compounds for further develop<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws103 gs74\">ment and commercialization. THR-149 has been selected as </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws1c4 gs76\">a development compound under the Bicyc<span class=\"_ _4\"></span>le Collaboration </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws2a gs77\">Agreement. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 wsf0 gs32\">Bicyc<span class=\"_ _4\"></span>le granted certain worldwide intellectual property rights </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 wsdc gs33\">to Oxurion for the development,<span class=\"_ _4\"></span> manuf<span class=\"_ _4\"></span>acture and commer<span class=\"_ _1\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws39 gs9b\">cialization of licensed compounds associated with plasma </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws2a gs7b\">kallikrein. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws35 gs7e\">The Bicy<span class=\"_ _4\"></span>cle Collaboration Agr<span class=\"_ _4\"></span>eement pro<span class=\"_ _4\"></span>vided an upfront </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws4d gs7f\">payment of 1<span class=\"_ _4\"></span>.0 million euro and potential ad<span class=\"_ _4\"></span>ditional researc<span class=\"_ _4\"></span>h </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws9e gs9e\">and development funding,<span class=\"_ _4\"></span> at an agreed upon FTE rate<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 wse8 gs11c\">should the researc<span class=\"_ _4\"></span>h effort require more than one FTE<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> or the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws0 gs11d\">researc<span class=\"_ _4\"></span>h plan be amended or extended by Oxurion<span class=\"_ _1a9\"> </span>. </div>Oxurion is also required to make certain milestone payments<span class=\"_ _1a9\"> </span>to Bicyc<span class=\"_ _4\"></span>le upon the achievement of specified r<span class=\"_ _4\"></span>esearch,<span class=\"_ _1\"></span> de<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>velopment,<span class=\"_ _4\"></span> regulatory and commercial milestones of up to<span class=\"_ _1a9\"> </span>21 million euro  (e<span class=\"_ _4\"></span>.g.,<span class=\"_ _4\"></span> 3 million euro r<span class=\"_ _4\"></span>elated to the first Phase<span class=\"_ _1a9\"> </span>3 trial if the Company decides to do one<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> and 5 million euro<span class=\"_ _3\"></span> when the first regulatory approval in either the United States<span class=\"_ _1a9\"> </span>or the European Union is granted for the fir<span class=\"_ _4\"></span>st indication)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Under the terms of the Bicyc<span class=\"_ _4\"></span>le Collaboration Agreement,<span class=\"_ _1\"></span> to date Oxurion has paid milestones of approximatel<span class=\"_ _4\"></span>y 5<span class=\"_ _1a9\"> </span>million euro<span class=\"_ _4\"></span>. In ad<span class=\"_ _4\"></span>dition,<span class=\"_ _4\"></span> to the extent an<span class=\"_ _4\"></span>y of the collabora<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tion products cover<span class=\"_ _4\"></span>ed by the licenses gr<span class=\"_ _4\"></span>anted to Oxurion<span class=\"_ _1a9\"> </span>are commercialized<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Bicycle <span class=\"_ _4\"></span>would be entitled to receive<span class=\"_ _1a9\"> </span>tiered ro<span class=\"_ _4\"></span>yalty payments of mid-single digits based on a<span class=\"_ _1a9\"> </span>percentage of net sales<span class=\"_ _4\"></span>. Royalty payments are subject to<span class=\"_ _1a9\"> </span>certain reductions. Also<span class=\"_ _1\"></span>, if Oxurion gr<span class=\"_ _4\"></span>ants a sublicense to<span class=\"_ _1a9\"> </span>a third party for rights to the program for non-ophthalmic<span class=\"_ _1a9\"> </span>use,<span class=\"_ _1\"></span> Bicycle w<span class=\"_ _4\"></span>ould be entitled to receive tier<span class=\"_ _4\"></span>ed payments<span class=\"_ _1a9\"> </span>of mid-single digits to low-doub<span class=\"_ _4\"></span>le digits (no higher than first<span class=\"_ _1a9\"> </span>quartile) based on a percentage of non-royalty sublicensing<span class=\"_ _1a9\"> </span>income. In line with IFRS princip<span class=\"_ _4\"></span>les,<span class=\"_ _1\"></span> no provisions have been<span class=\"_ _1a9\"> </span>made in the Company\u2019<span class=\"_ _1\"></span>s books for these payments<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>In November 2017<span class=\"_ _0\"></span>,<span class=\"_ _4\"></span> the parties entered into an amendment<span class=\"_ _3\"></span> to the Bicyc<span class=\"_ _4\"></span>le collaboration agreement. T<span class=\"_ _4\"></span>his amendment<span class=\"_ _1a9\"> </span>provides f<span class=\"_ _4\"></span>or additional researc<span class=\"_ _4\"></span>h ser<span class=\"_ _3\"></span>vices to be per<span class=\"_ _3\"></span>formed<span class=\"_ _1a9\"> </span>by Bicy<span class=\"_ _4\"></span>cle related to the identification of ad<span class=\"_ _4\"></span>ditional Bicyc<span class=\"_ _4\"></span>le<span class=\"_ _1a9\"> </span>peptides binding to the target for Oxurion,<span class=\"_ _1\"></span> in its discretion,<span class=\"_ _4\"></span> to<span class=\"_ _1a9\"> </span>select as development compounds. Bicy<span class=\"_ _4\"></span>cle w<span class=\"_ _4\"></span>as obligated to<span class=\"_ _1a9\"> </span>perform the work in accordance with an amended researc<span class=\"_ _4\"></span>h<span class=\"_ _1a9\"> </span>plan under Stage 1 of the collabor<span class=\"_ _4\"></span>ation and was funded at a<span class=\"_ _1a9\"> </span>specified FTE rate<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> plus any direct out of pocket expenses<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and<span class=\"_ _1a9\"> </span>Oxurion was r<span class=\"_ _4\"></span>esponsible for Stage 2 resear<span class=\"_ _4\"></span>ch and an<span class=\"_ _4\"></span>y de<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>velopment after the selection of a development compound<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Bicyc<span class=\"_ _4\"></span>le has completed Stage 1 of the researc<span class=\"_ _4\"></span>h plan. Ad<span class=\"_ _4\"></span>ditional<span class=\"_ _1a9\"> </span>milestones wer<span class=\"_ _4\"></span>e added for the potential additional licensed<span class=\"_ _1a9\"> </span>compounds,<span class=\"_ _1\"></span> consistent with those of the initial Bicycle<span class=\"_ _1a9\"> </span>Collaboration Agr<span class=\"_ _4\"></span>eement. This does not impact THR-149<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Based on IAS 38 \u201cIntangible assets<span class=\"_ _1\"></span>\u201d, Oxurion has not<span class=\"_ _1a9\"> </span>acquired a separate intang<span class=\"_ _4\"></span>ible asset that meets the defini<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tion of IAS 38<span class=\"_ _1\"></span>, and ther<span class=\"_ _4\"></span>efore these expenses ar<span class=\"_ _4\"></span>e recorded<span class=\"_ _1a9\"> </span>under R&amp;D expenses. So f<span class=\"_ _4\"></span>ar<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the follo<span class=\"_ _4\"></span>wing upfront and<span class=\"_ _1a9\"> </span>milestones payments to Bicyc<span class=\"_ _4\"></span>le were r<span class=\"_ _4\"></span>ecognized: 1<span class=\"_ _4\"></span>.0 million<span class=\"_ _1a9\"> </span>euro in 2013<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 0<span class=\"_ _1\"></span>.750 million euro in 2017<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> 1.0 million <span class=\"_ _4\"></span>euro in<span class=\"_ _1a9\"> </span>2018 and 2.0 million in 2020<span class=\"_ _1\"></span>. These w<span class=\"_ _4\"></span>ere all expensed as<span class=\"_ _1a9\"> </span>R&amp;D costs.<span class=\"_ _1a9\"> </span>Galapagos<span class=\"_ _1a9\"> </span>Oxurion has entered into the Galapagos License<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> which is a<span class=\"_ _1a9\"> </span>global and exclusive in-licensing agreement with Galapag<span class=\"_ _4\"></span>os<span class=\"_ _1a9\"> </span>to develop and commercialize integrin antagonists for the<span class=\"_ _1a9\"> </span>treatment of diabetic ey<span class=\"_ _4\"></span>e disease. T<span class=\"_ _4\"></span>he company\u2019<span class=\"_ _1\"></span>s THR-687<span class=\"_ _4\"></span> asset for which development has been paused is a r<span class=\"_ _4\"></span>esult of<span class=\"_ _1a9\"> </span>this agreement. Oxurion has obtained the exclusive rights f<span class=\"_ _4\"></span>or<span class=\"_ _1a9\"> </span>the clinical development,<span class=\"_ _1\"></span> manufacturing and commercial<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>ization under this agreement,<span class=\"_ _1\"></span> while Galapagos is entitled to<span class=\"_ _3\"></span> receive a non-refundab<span class=\"_ _4\"></span>le upfront fee for tec<span class=\"_ _4\"></span>hnolog<span class=\"_ _3\"></span>y access,<span class=\"_ _4\"></span> development milestone payments of up to 12.5 million<span class=\"_ _1a9\"> </span>euro (e<span class=\"_ _4\"></span>.g.,<span class=\"_ _4\"></span> 1<span class=\"_ _1\"></span>.5 million euro related to the first Phase 3 if the<span class=\"_ _1a9\"> </span>Company decides to do one<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> and 5 million euro when the<span class=\"_ _3\"></span> first regulatory approval in either the United States or the<span class=\"_ _1a9\"> </span>European Union is granted for the fir<span class=\"_ _4\"></span>st indication)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>In addition,<span class=\"_ _1\"></span> to the extent any of the collaboration products<span class=\"_ _1a9\"> </span>cover<span class=\"_ _4\"></span>ed by the licenses granted to Oxurion ar<span class=\"_ _4\"></span>e commercial<span class=\"_ _4\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>ized<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> Galapagos would be entitled to receive certain sales-<span class=\"_ _1a9\"> </span>based milestone payments and tiered ro<span class=\"_ _4\"></span>yalty payments of<span class=\"_ _1a9\"> </span>mid-single digits based on a percentage of net sales,<span class=\"_ _1\"></span> except<span class=\"_ _1a9\"> </span>in the case of annual sales exceeding 500 million euro<span class=\"_ _1\"></span>, in<span class=\"_ _1a9\"> </span>which case the ro<span class=\"_ _4\"></span>yalty is higher<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>In September 2017<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> the par<span class=\"_ _3\"></span>ties entered into an amendment<span class=\"_ _1a9\"> </span>to the Galapagos License Agreement. Accor<span class=\"_ _4\"></span>ding to this<span class=\"_ _1a9\"> </span>amendment,<span class=\"_ _4\"></span> Oxurion has taken o<span class=\"_ _4\"></span>ver the prosecution and<span class=\"_ _1a9\"> </span>maintenance of the licensed patents and consequently has<span class=\"_ _1a9\"> </span>acquired all rights in the licensed patents with effective date<span class=\"_ _1a9\"> </span>as of September 25<span class=\"_ _1\"></span>, 2017<span class=\"_ _25\"></span>. Oxurion will be entitled to deduct<span class=\"_ _1a9\"> </span>its documented and reasonable costs f<span class=\"_ _4\"></span>or prosecution and<span class=\"_ _1a9\"> </span><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws181 gs86\">maintenance for the licensed patents from the ro<span class=\"_ _4\"></span>yalty due </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws2e gs88\">and payable to Galapagos under the Galapagos License </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws4f gs89\">Agreement. In line with IFRS principles<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> no pro<span class=\"_ _4\"></span>visions have </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws0 gs56\">been made in the Company\u2019<span class=\"_ _1\"></span>s books for these payments<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws12f gs58\">Oxurion has paid to Galapagos an upfront fee of 1<span class=\"_ _1\"></span>.0 million<span class=\"_ _3\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 wsf5 gs5a\">euro in April 2016<span class=\"_ _25\"></span>, upon Galapagos supp<span class=\"_ _4\"></span>lying to Oxurion </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws15a gs5b\">the licensed compounds,<span class=\"_ _1\"></span> including THR-687<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> and all data </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws268 gs8a\">and manufacturing kno<span class=\"_ _4\"></span>w-how related to the licensed </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws134 gs8b\">compounds,<span class=\"_ _1\"></span> which was capitalized as an intangible asset </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws45 gs8c\">as it meets the conditions of a separately acquir<span class=\"_ _4\"></span>ed intan<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 wsb4 gs5e\">gible asset under IAS 38<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> par<span class=\"_ _1\"></span>. 25<span class=\"_ _1\"></span>. Galapagos has no fur<span class=\"_ _3\"></span>ther </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws6b gs5f\">performance obligations for development ser<span class=\"_ _3\"></span>vices. Since </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws16e gs173\">no commercialization was ac<span class=\"_ _4\"></span>hieved and no profit was </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws115 gs63\">generated<span class=\"_ _1\"></span>, no amortization was r<span class=\"_ _4\"></span>ecorded so far<span class=\"_ _1\"></span>. Until now<span class=\"_ _25\"></span>, </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 wsa6 gs65\">no other advance payments have been made to Galapagos<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws124 gs68\">In the first half of 2022,<span class=\"_ _4\"></span> the Galapagos license w<span class=\"_ _4\"></span>as fully </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws41 gsa8\">impaired (1 million euro) given the announcement that </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws10e gs6a\">Oxurion has decided not to advance THR-687<span class=\"_ _1\"></span> to par<span class=\"_ _3\"></span>t B of<span class=\"_ _3\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws0 gs6c\">the INTEGRAL trial.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws132 gs6f\">The future milestones m<span class=\"_ _4\"></span>ust be assessed to determine if </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws11f gsa9\">they meet the capitalization criteria under IAS 38<span class=\"_ _1\"></span>, once they </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws14 gs71\">are paid<span class=\"_ _1\"></span>. We r<span class=\"_ _4\"></span>efer to the accounting policy section on intan<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls25 ws0 gs73\">gible assets for mor<span class=\"_ _4\"></span>e details.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h17 ff8 fs9 fc7 sc0 ls0 ws0 gsaa\">Clinical T<span class=\"_ _25\"></span>rial Agreement<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs2aa\">Syneos Health<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws269 gs79\">Syneos Health (<span class=\"ff3 ws0\">\u201cSyneos<span class=\"_ _1\"></span>\u201d<span class=\"ff1 ws269\">) provides clinical r<span class=\"_ _4\"></span>esearch </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws19b gs7a\">ser<span class=\"_ _3\"></span>vices for the development of THR-149<span class=\"_ _1\"></span>. Ser<span class=\"_ _3\"></span>vices are </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa0 gs12\">billed on a project basis by w<span class=\"_ _4\"></span>ay of work or<span class=\"_ _4\"></span>ders (<span class=\"ff3 ws0\">\u201cW<span class=\"_ _4\"></span>ork </span></div><div class=\"t m1 he ff3 fs9 fc7 sc0 ls0 ws0 gs13\">Orders<span class=\"_ _4\"></span>\u201d<span class=\"ff1 ws26a\">) enter<span class=\"_ _4\"></span>ed into based on a Master Ser<span class=\"_ _3\"></span>vices </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws10b gs7d\">Agreement (the <span class=\"ff3 ws0\">\u201cMSA<span class=\"_ _0\"></span>\u201d<span class=\"ff1 ws10b\">) for Clinical Research and Related </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs14\">Ser<span class=\"_ _3\"></span>vices dated as of August 19<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2016<span class=\"_ _25\"></span>.   </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1a gs87\">The MSA obligates the parties to use commercially rea<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb5 gs18\">sonable efforts to progress the study in a timely manner </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws120 gs19\">and to meet any timelines for stud<span class=\"_ _4\"></span>y milestones and target </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws105 gs1a\">dates applying prof<span class=\"_ _4\"></span>essional standards consistent with GCP </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs1b\">and in adherence to applicab<span class=\"_ _4\"></span>le laws and regulations<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws16b gs1c\">The major study milestones and target dates ar<span class=\"_ _4\"></span>e described </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws2b gs1d\">in the binding W<span class=\"_ _4\"></span>ork Orders that ar<span class=\"_ _4\"></span>e entered into under the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws14 gs1e\">MSA. Subject to mutually agreed c<span class=\"_ _4\"></span>hange orders,<span class=\"_ _1\"></span> the W<span class=\"_ _4\"></span>ork </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb0 gs1f\">Order constitutes a binding agreement,<span class=\"_ _1\"></span> and the par<span class=\"_ _3\"></span>ties </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws56 gs8d\">are obligated to use commer<span class=\"_ _4\"></span>cially reasonable eff<span class=\"_ _4\"></span>orts to </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws124 gs20\">comply with the timelines and b<span class=\"_ _4\"></span>udgets set in the W<span class=\"_ _4\"></span>ork </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs60\">Orders,<span class=\"_ _1\"></span> unless a change order is agreed<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsbb gs64\">The W<span class=\"_ _4\"></span>ork Order f<span class=\"_ _4\"></span>or THR-149 specifies the basic parame<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsdc gsb1\">ters of the THR -149 study<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> including,<span class=\"_ _1\"></span> without limitation, <span class=\"_ _4\"></span>the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws21 gs90\">scope of work,<span class=\"_ _1\"></span> study-specific assumptions,<span class=\"_ _4\"></span> estimated time </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsff gs26\">period for completing services,<span class=\"_ _4\"></span> estimated budget,<span class=\"_ _1\"></span> payment </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws187 gs69\">and currency sc<span class=\"_ _4\"></span>hedules,<span class=\"_ _1\"></span> resource allocation and/or<span class=\"_ _1\"></span>, as ap<span class=\"_ _4\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws16b gs6b\">plicable<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> other specific ser<span class=\"_ _23\"></span>vices to be performed by Syneos<span class=\"_ _4\"></span>. <span class=\"_ _190\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws10b gs6d\">The budget contained in the THR-149 W<span class=\"_ _1\"></span>ork Order can be </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1a gs2a\">changed b<span class=\"_ _4\"></span>y way of a change or<span class=\"_ _4\"></span>der if there are c<span class=\"_ _4\"></span>hanges </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws180 gs93\">in the scope of the work or the assumptions underl<span class=\"_ _4\"></span>ying </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws78 gs94\">the W<span class=\"_ _4\"></span>ork Order<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> pro<span class=\"_ _4\"></span>vided that the change or<span class=\"_ _4\"></span>der must be </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs72\">agreed betw<span class=\"_ _4\"></span>een the parties.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws2e gs74\">Syneos also pro<span class=\"_ _4\"></span>vided ser<span class=\"_ _3\"></span>vices for the INTEGRAL study </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws35 gs76\">of THR-687<span class=\"_ _4\"></span> in treatment na\u00efve patients<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> whic<span class=\"_ _4\"></span>h has been </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws149 gs77\">terminated and is in the process of being wound do<span class=\"_ _4\"></span>wn </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs31\">pursuant to the terms of the W<span class=\"_ _4\"></span>ork Order f<span class=\"_ _4\"></span>or THR-687<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa1 gs33\">Based on IAS 38 \u201cIntangible assets<span class=\"_ _1\"></span>\u201d, the costs paid to </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws156 gs9b\">Syneos Health are not made in or<span class=\"_ _4\"></span>der to acquire an asset,<span class=\"_ _1\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws192 gs7b\">or to increase economic benefits alread<span class=\"_ _4\"></span>y embodied into an </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws12f gs7c\">asset. Rather<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> they are an outsourced R&amp;D cost. T<span class=\"_ _4\"></span>herefor<span class=\"_ _4\"></span>e,<span class=\"_ _1\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws85 gs7e\">such costs are expensed to the statement of pr<span class=\"_ _4\"></span>ofit and </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wse8 gs7f\">loss as R&amp;D expenses,<span class=\"_ _1\"></span> as incurred<span class=\"_ _4\"></span>. In case of prepayments<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws86 gs9e\">an asset is recognized for suc<span class=\"_ _4\"></span>h prepayment,<span class=\"_ _1\"></span> and prepay<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws78 gs83\">ment is released to statement of profit and loss as costs </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws6d gs84\">are incurr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>. In 2022 and 2021<span class=\"_ _1\"></span>, 7<span class=\"_ _25\"></span>.4 million euro and 6<span class=\"_ _25\"></span>.5<span class=\"_ _1a9\"> </span></div>million euro wer<span class=\"_ _4\"></span>e paid respectively to S<span class=\"_ _4\"></span>yneos Health and<span class=\"_ _1a9\"> </span>recognized as R&amp;D expenses<span class=\"_ _4\"></span>. At y<span class=\"_ _4\"></span>ear<span class=\"_ _1\"></span>-end 2022,<span class=\"_ _4\"></span> a prepay<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ment in the amount of .2.3 million euro is recorded on the<span class=\"_ _1a9\"> </span>statement of profit and loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>License,<span class=\"_ _1\"></span> Development and Commercial Agreement<span class=\"_ _1a9\"> </span>Eumedica and Inceptua<span class=\"_ _1a9\"> </span>In June 2018<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion and Eumedica entered into an<span class=\"_ _1a9\"> </span>exclusive commercial agr<span class=\"_ _4\"></span>eement,<span class=\"_ _4\"></span> pursuant to whic<span class=\"_ _4\"></span>h<span class=\"_ _1a9\"> </span>Eumedica agreed to pro<span class=\"_ _4\"></span>vide distribution services for<span class=\"_ _1a9\"> </span>JETREA\u00ae (the <span class=\"ff3 wsa4\">\u201c2018 Agreement\u201d</span>)<span class=\"_ _1\"></span>. Eumedica acts as an<span class=\"_ _1a9\"> </span>agent of Oxurion,<span class=\"_ _4\"></span> as Oxurion takes primary responsibility<span class=\"_ _1a9\"> </span>for product quality<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> inventory risk,<span class=\"_ _4\"></span> and has discretion in es<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tablishing the sales price<span class=\"_ _4\"></span>. The arr<span class=\"_ _4\"></span>angement has the char<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>acteristics of a consignment where Eumedica does not<span class=\"_ _1a9\"> </span>have control of the pr<span class=\"_ _4\"></span>oduct,<span class=\"_ _4\"></span> and Oxurion can direct its use<span class=\"_ _1a9\"> </span>and ask for its return. Eumedica collects payments fr<span class=\"_ _4\"></span>om<span class=\"_ _1a9\"> </span>end-customers for Oxurion. Eumedica char<span class=\"_ _4\"></span>ges a monthly<span class=\"_ _1a9\"> </span>distribution fee that co<span class=\"_ _4\"></span>vers the ser<span class=\"_ _3\"></span>vices provided inc<span class=\"_ _4\"></span>luding<span class=\"_ _1a9\"> </span>customer ser<span class=\"_ _3\"></span>vice,<span class=\"_ _1\"></span> shipment preparation,<span class=\"_ _4\"></span> packag<span class=\"_ _4\"></span>ing,<span class=\"_ _4\"></span> storage<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> labeling/r<span class=\"_ _4\"></span>epackaging,<span class=\"_ _4\"></span> administr<span class=\"_ _4\"></span>ation,<span class=\"_ _4\"></span> destruction<span class=\"_ _1a9\"> </span>&amp; waste handling,<span class=\"_ _4\"></span> etc<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Under IFRS 15<span class=\"_ _1\"></span>, Oxurion has onl<span class=\"_ _4\"></span>y one performance obliga<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion,<span class=\"_ _4\"></span> which is to deliver the pr<span class=\"_ _4\"></span>oduct to the end-customer<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>This performance obligation is satisfied when Eumedica<span class=\"_ _1a9\"> </span>transfers (deliver<span class=\"_ _4\"></span>s) the product to the end-customer<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> as this<span class=\"_ _1a9\"> </span>is the moment when the customer obtains control o<span class=\"_ _4\"></span>ver the<span class=\"_ _1a9\"> </span>product. Ther<span class=\"_ _4\"></span>efore<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> r<span class=\"_ _4\"></span>evenue is recognized for the price of<span class=\"_ _1a9\"> </span>the product at the point in time when it is delivered b<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span>Eumedica to the end-customer<span class=\"_ _1\"></span>. While inventor<span class=\"_ _3\"></span>y is located<span class=\"_ _1a9\"> </span>at Eumedica,<span class=\"_ _4\"></span> it is recognized as in<span class=\"_ _4\"></span>ventor<span class=\"_ _3\"></span>y of Oxurion due to<span class=\"_ _1a9\"> </span>consignment terms. Eumedica f<span class=\"_ _4\"></span>ees are recognized partly<span class=\"_ _1a9\"> </span>under distribution costs and partly under selling expenses,<span class=\"_ _4\"></span> as they are char<span class=\"_ _4\"></span>ged on a monthly basis.<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>or 2022,<span class=\"_ _4\"></span> Oxurion paid 0<span class=\"_ _1\"></span>.067<span class=\"_ _4\"></span> million euro (2021: 0<span class=\"_ _25\"></span>.072<span class=\"_ _1a9\"> </span>million euro) for distribution costs<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 0<span class=\"_ _25\"></span>.204 million euro (2021:<span class=\"_ _1a9\"> </span>0<span class=\"_ _1\"></span>.225 million euro) for selling expenses and received<span class=\"_ _1a9\"> </span>0<span class=\"_ _1\"></span>.403 million euro (2021: 0<span class=\"_ _1\"></span>.588 million euro) reven<span class=\"_ _4\"></span>ue for<span class=\"_ _1a9\"> </span>the select number of markets ser<span class=\"_ _3\"></span>ved by Eumedica.<span class=\"_ _1a9\"> </span>On March 12,<span class=\"_ _1\"></span> 2020<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion entered into an exclusive<span class=\"_ _1a9\"> </span>license with Inceptua for the commercialization and<span class=\"_ _1a9\"> </span>marketing of JETREA\u00ae outside of the US in certain transfer<span class=\"_ _1a9\"> </span>countries. T<span class=\"_ _25\"></span>ransfer countries include all countries of the<span class=\"_ _1a9\"> </span>European Union,<span class=\"_ _4\"></span> Norway<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> Liechtenstein,<span class=\"_ _1\"></span> Switzerland,<span class=\"_ _1\"></span> the<span class=\"_ _1a9\"> </span>UK and Australia and sales may also be made in non-ap<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>proved countries on a named patient basis under r<span class=\"_ _4\"></span>espect<span class=\"_ _1a9\"> </span>of applicable la<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>. The parties fur<span class=\"_ _3\"></span>ther agreed that Oxurion<span class=\"_ _1a9\"> </span>would withdr<span class=\"_ _4\"></span>aw the marketing authorizations in the US<span class=\"_ _1a9\"> </span>and Canada and would tr<span class=\"_ _4\"></span>ansfer the EMEA marketing au<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>thorization to Inceptua. The license became effective on<span class=\"_ _1a9\"> </span>September 15<span class=\"_ _1\"></span>, 2020<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> when the EMEA market authoriza<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion was tr<span class=\"_ _4\"></span>ansferred<span class=\"_ _1\"></span>. Under the terms of the agreement,<span class=\"_ _4\"></span> Inceptua purchases JETREA\u00ae fr<span class=\"_ _4\"></span>om Oxurion in final product<span class=\"_ _1a9\"> </span>form for a fixed amount per vial and pays Oxurion a market<span class=\"_ _1a9\"> </span>rate ro<span class=\"_ _4\"></span>yalty on sales based on quarterly royalty reports.<span class=\"_ _1a9\"> </span>As a result of its agreement with Inceptua,<span class=\"_ _1\"></span> Oxurion entered<span class=\"_ _1a9\"> </span>into a tripartite agreement with Eumedica and Inceptua<span class=\"_ _1a9\"> </span>pursuant to which Eumedica pr<span class=\"_ _4\"></span>ovides certain packaging,<span class=\"_ _4\"></span> labelling and storage ser<span class=\"_ _3\"></span>vices directly to Oxurion and<span class=\"_ _1a9\"> </span>purchases the finished pr<span class=\"_ _4\"></span>oduct from Oxurion and sells its<span class=\"_ _1a9\"> </span>to Inceptua (the <span class=\"ff3 ws12e\">\u201cT<span class=\"_ _25\"></span>ripar<span class=\"_ _3\"></span>tite Agreement\u201d<span class=\"ff1 ws125\">)<span class=\"_ _4\"></span>. The T<span class=\"_ _25\"></span>ripar<span class=\"_ _3\"></span>tite<span class=\"_ _1a9\"> </span></span></span>Agreement rep<span class=\"_ _4\"></span>laces the 2018 Agreement. Eumedica also<span class=\"_ _1a9\"> </span>provides certain ser<span class=\"_ _3\"></span>vices to Oxurion on behalf of Inceptua,<span class=\"_ _4\"></span> including storage<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> customer ser<span class=\"_ _23\"></span>vices and deliver<span class=\"_ _3\"></span>y<span class=\"_ _1\"></span>,<span class=\"_ _1\"></span> which<span class=\"_ _1a9\"> </span>are re-c<span class=\"_ _4\"></span>harged to Inceptua.<span class=\"_ _1a9\"> </span>After a transition period which w<span class=\"_ _4\"></span>as completed in December<span class=\"_ _1a9\"> </span>2020<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s obligations under the T<span class=\"_ _25\"></span>ripar<span class=\"_ _3\"></span>tite Agreement<span class=\"_ _1a9\"> </span>will be limited to supply of the JETREA\u00ae pr<span class=\"_ _4\"></span>oduct to<span class=\"_ _1a9\"> </span>Inceptua until 2023<span class=\"_ _1\"></span>. All other activities related to JETREA\u00ae<span class=\"_ _1a9\"> </span>will be transferr<span class=\"_ _4\"></span>ed to Inceptua or will cease<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>Under IFRS 15<span class=\"_ _1\"></span>, Oxurion<span class=\"_ _1\"></span>\u2019<span class=\"_ _4\"></span>s only performance obligation is to deliver final products to Inceptua. This ob<span class=\"_ _4\"></span>ligation is completed when Eumedica sells the products to Inceptua. Oxurion therefor<span class=\"_ _4\"></span>e recognizes the reven<span class=\"_ _4\"></span>ue from the sale of the goods when the assets are sold b<span class=\"_ _4\"></span>y Eumedica to Inceptua. Royalties ar<span class=\"_ _4\"></span>e recognised quarterly upon reception of royalty r<span class=\"_ _4\"></span>eport from Inceptua.<span class=\"_ _1a9\"> </span>Oxurion received 0<span class=\"_ _25\"></span>.153 million euro royalties (2021: 0<span class=\"_ _1\"></span>.159 million euro) for the select number of markets served by Inceptua.<span class=\"_ _1a9\"> </span>Academic Agreements<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y has concluded agreements with various academic institutions that are interested in the stud<span class=\"_ _4\"></span>y of drug candidates,<span class=\"_ _1\"></span> including the following:<span class=\"_ _1a9\"> </span>Flanders Institute for Biotechno<span class=\"_ _4\"></span>log<span class=\"_ _3\"></span>y<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y has entered into several agr<span class=\"_ _4\"></span>eements with the V<span class=\"_ _4\"></span>esalius Researc<span class=\"_ _4\"></span>h Centre (former<span class=\"_ _4\"></span>ly the Dept. of T<span class=\"_ _25\"></span>ransgene T<span class=\"_ _1\"></span>echnology and Gene Therapy)<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> a department of VIB<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> relating to the preclinical char<span class=\"_ _4\"></span>acterization of two of the programs under license with the V<span class=\"_ _1\"></span>esalius Research Centre<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> i.e<span class=\"_ _4\"></span>.,<span class=\"_ _1\"></span> Anti-PlGF and PlGF<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>On December 12,<span class=\"_ _4\"></span> 2017<span class=\"_ _0\"></span>, Oncurious and VIB enter<span class=\"_ _4\"></span>ed into a researc<span class=\"_ _4\"></span>h collaboration and license agreement on the basis of which Oncurious acquired exc<span class=\"_ _4\"></span>lusive licenses on a portfolio of five unique next generation immuno-oncology assets,<span class=\"_ _1\"></span> based on seminal work originating from the VIB-KU Leuven labs of Massimiliano Mazzone and Gabriele Bergers,<span class=\"_ _1\"></span> and from the VIB-<span class=\"_ _1\"></span>VUB lab of Jo V<span class=\"_ _1\"></span>an Ginderachter<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>In the context of the abovementioned r<span class=\"_ _4\"></span>esearch collabor<span class=\"_ _4\"></span>a<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion and license agreement,<span class=\"_ _1\"></span> VIB has been granted two call options from Oxurion for an aggregate maximum of 1<span class=\"_ _4\"></span>,230 shares in Oncurious,<span class=\"_ _1\"></span> subject to the achievement of certain milestones linked to the achievement of one or tw<span class=\"_ _4\"></span>o proof of concepts (call option agreement of December 12,<span class=\"_ _1\"></span> 2017). On October 22,<span class=\"_ _4\"></span> 2021<span class=\"_ _1\"></span>, Oncurious announced the ac<span class=\"_ _4\"></span>hieve<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ment of a second preclinical pr<span class=\"_ _4\"></span>oof of concept for its im<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>muno-oncology program aimed at depleting regulatory T cells (T<span class=\"_ _25\"></span>regs) by targeting C-C motif chemokine r<span class=\"_ _4\"></span>eceptor 8 (CCR8)<span class=\"_ _4\"></span>. Consequently<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> at y<span class=\"_ _4\"></span>ear end 2021<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> VIB is entitled to execute its remaining call option of 550 shares<span class=\"_ _4\"></span>. P<span class=\"_ _4\"></span>ost-<span class=\"_ _1a9\"> </span>closing VIB indicated it is executing this remaining call option in full.<span class=\"_ _1a9\"> </span>As per June 30<span class=\"_ _25\"></span>, 2021<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the VIB IP license has been impaired<span class=\"_ _1\"></span>, compared with a net carrying amount of 1.127<span class=\"_ _1\"></span> million euro in 2020<span class=\"_ _1\"></span>. During 2021<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> Oxurion has paid 0<span class=\"_ _1\"></span>.211 million euro of R&amp;D costs respectively to VIB in r<span class=\"_ _4\"></span>elation to this research program. On September 28<span class=\"_ _1\"></span>, 2022,<span class=\"_ _1\"></span> Oncurious entered into an agreement with VIB concerning the assignment of intellec<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tual property rights and know-how<span class=\"_ _25\"></span>, and the termination of certain licenses. The assignment concerns Oncurious<span class=\"_ _1\"></span>\u2019 C-C motif chemokine r<span class=\"_ _4\"></span>eceptor 8 (CCR8) program,<span class=\"_ _1\"></span> as well as other undisclosed assets<span class=\"_ _4\"></span>. The assignment does not include Oncurious<span class=\"_ _4\"></span>\u2019 TB-403 asset. The agr<span class=\"_ _4\"></span>eement was conc<span class=\"_ _4\"></span>luded follo<span class=\"_ _4\"></span>wing the decision of Oncurious not to further invest in the foreground tec<span class=\"_ _4\"></span>hnology of several discover<span class=\"_ _3\"></span>y stage and preclinical pr<span class=\"_ _4\"></span>ograms<span class=\"_ _4\"></span>. In consideration of Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s contri<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>butions to<span class=\"_ _4\"></span>wards the development of for<span class=\"_ _4\"></span>eground techno<span class=\"_ _4\"></span>l<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>og<span class=\"_ _3\"></span>y by Oncurious,<span class=\"_ _1\"></span> prior to Oncurious<span class=\"_ _4\"></span>\u2019 abandonment and assignment to VIB thereof<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the parties agreed on a revenue sharing agreement with Oxurion upon VIB\u2019<span class=\"_ _1\"></span>s valorization of such for<span class=\"_ _4\"></span>eground technology<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>On December 14<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _1\"></span> Oxurion purchased 2,018 shares in Oncurious from VIB for 1 euro<span class=\"_ _1a9\"> </span>Other Commitments<span class=\"_ _1a9\"> </span>Research and development commitments<span class=\"_ _1a9\"> </span>At December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022,<span class=\"_ _4\"></span> the Group had commitments<span class=\"_ _1a9\"> </span>outstanding in the context of researc<span class=\"_ _4\"></span>h and development<span class=\"_ _1a9\"> </span>agreements amounting to 11<span class=\"_ _1\"></span>.0 million euro compared to<span class=\"_ _1a9\"> </span>18<span class=\"_ _1\"></span>.0 million euro in 2021<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> payable o<span class=\"_ _4\"></span>ver the course of the<span class=\"_ _1a9\"> </span>follo<span class=\"_ _4\"></span>wing twelve months to various resear<span class=\"_ _4\"></span>ch subcontrac<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tors,<span class=\"_ _1\"></span> but primarily to Syneos<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Contingent liability<span class=\"_ _1a9\"> </span>The expenses incurr<span class=\"_ _4\"></span>ed in several of the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s research<span class=\"_ _1a9\"> </span>and development programs ha<span class=\"_ _4\"></span>ve been reimbursed b<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span>VLAIO<span class=\"_ _25\"></span>, former<span class=\"_ _4\"></span>ly known as IWT<span class=\"_ _0\"></span>, as a g<span class=\"_ _4\"></span>overnment grant.<span class=\"_ _1a9\"> </span>Contracts with VLAIO generall<span class=\"_ _4\"></span>y include a clause that<span class=\"_ _1a9\"> </span>defines the need for validation of the project results in<span class=\"_ _1a9\"> </span>order for the grant to be eff<span class=\"_ _4\"></span>ectively earned<span class=\"_ _4\"></span>. Should this<span class=\"_ _1a9\"> </span>validation not occur<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> VLAIO has the right to reclaim the<span class=\"_ _1a9\"> </span>funds previously gr<span class=\"_ _4\"></span>anted<span class=\"_ _4\"></span>. The Gr<span class=\"_ _4\"></span>oup considers this as a<span class=\"_ _1a9\"> </span>remote possibility<span class=\"_ _25\"></span>. Please refer to the accounting policy<span class=\"_ _1a9\"> </span>described in section 5<span class=\"_ _1\"></span>.5<span class=\"_ _4\"></span>.3 (G) and the rationale used in<span class=\"_ _1a9\"> </span>order to recognize gr<span class=\"_ _4\"></span>ant income over the course of the<span class=\"_ _1a9\"> </span>project. T<span class=\"_ _25\"></span>otal amounts received in 2021 with respect to<span class=\"_ _1a9\"> </span>government gr<span class=\"_ _4\"></span>ants from VLAIO amount to 0<span class=\"_ _1\"></span>.228 million<span class=\"_ _1a9\"> </span>euro<span class=\"_ _4\"></span>. No amounts w<span class=\"_ _4\"></span>ere r<span class=\"_ _4\"></span>eceived in 2022.<span class=\"_ _1a9\"> </span>Related parties<span class=\"_ _1a9\"> </span>Other than members of the Board of Director<span class=\"_ _4\"></span>s,<span class=\"_ _1\"></span> no other<span class=\"_ _1a9\"> </span>related parties have been identified<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Subsequent events<span class=\"_ _1a9\"> </span>On Jan<span class=\"_ _4\"></span>uar<span class=\"_ _3\"></span>y 25<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2023<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the Compan<span class=\"_ _4\"></span>y has further amended<span class=\"_ _1a9\"> </span>its mandator<span class=\"_ _3\"></span>y convertible bonds issuance and sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>scription agreement with the Negma Group<span class=\"_ _1\"></span>. Before the<span class=\"_ _1a9\"> </span>amendment,<span class=\"_ _4\"></span> Negma had subscribed to 11 million euro in<span class=\"_ _1a9\"> </span>convertible bonds. Pur<span class=\"_ _4\"></span>suant to the amendment,<span class=\"_ _4\"></span> Negma<span class=\"_ _1a9\"> </span>agreed to subscribe to up to 4 million euro (1<span class=\"_ _1\"></span>,600 bonds)<span class=\"_ _1a9\"> </span>in three tranc<span class=\"_ _4\"></span>hes to be called at Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s full discretion.<span class=\"_ _1a9\"> </span>Similar to Part B of the funding program with Negma,<span class=\"_ _1\"></span> the<span class=\"_ _1a9\"> </span>liquidity requirement w<span class=\"_ _4\"></span>as eliminated<span class=\"_ _1\"></span>, and the con<span class=\"_ _4\"></span>version<span class=\"_ _1a9\"> </span>price of the shares w<span class=\"_ _4\"></span>as 80% of the low<span class=\"_ _4\"></span>est closing VW<span class=\"_ _25\"></span>AP<span class=\"_ _1a9\"> </span>over the 15 consecutive tr<span class=\"_ _4\"></span>ading days in advance of the<span class=\"_ _1a9\"> </span>conversion notice<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On March 1<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2023<span class=\"_ _1\"></span>, the funding progr<span class=\"_ _4\"></span>am with Negma<span class=\"_ _1a9\"> </span>ended according to the terms of the agreements<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On March 1<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2023<span class=\"_ _1\"></span>, the Compan<span class=\"_ _4\"></span>y entered into the A<span class=\"_ _4\"></span>tlas<span class=\"_ _1a9\"> </span>Subscription Agreement for mandatory conver<span class=\"_ _3\"></span>tible<span class=\"_ _1a9\"> </span>bonds with Atlas Special Opportunities,<span class=\"_ _4\"></span> LLC pro<span class=\"_ _4\"></span>viding<span class=\"_ _1a9\"> </span>for up to 20 million euro in financing. Under the terms<span class=\"_ _1a9\"> </span>of the Subscription Agreement,<span class=\"_ _1\"></span> Atlas has committed to<span class=\"_ _1a9\"> </span>subscribe to up to 20 million euro in mandatorily convert<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ible bonds o<span class=\"_ _4\"></span>ver a 2<span class=\"_ _4\"></span>4-month period at Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s discretion.<span class=\"_ _1a9\"> </span>The conver<span class=\"_ _4\"></span>sion price is set at an eight percent discount<span class=\"_ _1a9\"> </span>to the average VW<span class=\"_ _25\"></span>AP over the three lo<span class=\"_ _4\"></span>west days in the<span class=\"_ _1a9\"> </span>ten consecutive trading days prior to the conver<span class=\"_ _4\"></span>sion notice.<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y will pay a fee of 800<span class=\"_ _1\"></span>,000 euro in bonds,<span class=\"_ _1\"></span> which will be issued together with the first tr<span class=\"_ _4\"></span>anche<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> raising<span class=\"_ _1a9\"> </span>the total amount of the available bonds to 20<span class=\"_ _25\"></span>.8 million<span class=\"_ _1a9\"> </span>euro<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he funding will be provided in nine tr<span class=\"_ _4\"></span>anches,<span class=\"_ _1\"></span> with<span class=\"_ _1a9\"> </span>the first tranc<span class=\"_ _4\"></span>he including a P<span class=\"_ _4\"></span>art A of 2.8 million euro<span class=\"_ _1a9\"> </span>(including the fee) and P<span class=\"_ _4\"></span>art B of 2 million euro<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>sequent tranches of 2 million eur<span class=\"_ _4\"></span>o each with a cool<span class=\"_ _4\"></span>-do<span class=\"_ _4\"></span>wn<span class=\"_ _1a9\"> </span>period of 22 trading days betw<span class=\"_ _4\"></span>een tranches (except for<span class=\"_ _1a9\"> </span>between P<span class=\"_ _4\"></span>art A and Part B of the first tranche where ther<span class=\"_ _4\"></span>e<span class=\"_ _1a9\"> </span>is no cool down period)<span class=\"_ _1\"></span>. Provided the conditions precedent<span class=\"_ _1a9\"> </span>are met,<span class=\"_ _1\"></span> the decision to issue one or more tranches is at<span class=\"_ _1a9\"> </span>the discretion of the Compan<span class=\"_ _4\"></span>y<span class=\"_ _25\"></span>. Cer<span class=\"_ _3\"></span>tain of the conditions<span class=\"_ _1a9\"> </span>precedents are not within the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s control,<span class=\"_ _4\"></span> including<span class=\"_ _1a9\"> </span>that the Company\u2019<span class=\"_ _1\"></span>s total trading volume in the prior 22<span class=\"_ _1a9\"> </span>trading days exceeds 1<span class=\"_ _1\"></span>.5 million euro and that its average<span class=\"_ _1a9\"> </span>market capitalization exceeds 4 million euro (or 2 million<span class=\"_ _1a9\"> </span>euro for a 1 million euro tr<span class=\"_ _4\"></span>anche)<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>n addition,<span class=\"_ _1\"></span> on March 1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2023<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> Oxurion amended the terms of its convertible bond loan agreement with Kreos Capital and Pontif<span class=\"_ _4\"></span>ax V<span class=\"_ _4\"></span>entur<span class=\"_ _4\"></span>es,<span class=\"_ _1\"></span> originally signed on November 22,<span class=\"_ _4\"></span> 2021<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> (as already amended on June 30<span class=\"_ _25\"></span>, 2022)<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> to reduce the Company\u2019<span class=\"_ _1\"></span>s debt by appr<span class=\"_ _4\"></span>oximately 1 million euro b<span class=\"_ _4\"></span>y making a prepayment in exchange f<span class=\"_ _4\"></span>or a corresponding reduction in its cash co<span class=\"_ _4\"></span>venant and other benefits.<span class=\"_ _1a9\"> </span>On March 14<span class=\"_ _1\"></span>, 2023<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion announced that given their other commitments,<span class=\"_ _1\"></span> Dr<span class=\"_ _4\"></span>. David Guy<span class=\"_ _4\"></span>er and Dr<span class=\"_ _1\"></span>. Adrienne Graves decided to r<span class=\"_ _4\"></span>esign from the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s Board of Directors and that Dr<span class=\"_ _1\"></span>. Anat Loewenstein,<span class=\"_ _1\"></span> Director of the Department of Ophthalmolog<span class=\"_ _3\"></span>y at T<span class=\"_ _1\"></span>el A<span class=\"_ _4\"></span>viv University<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> and Nathalie Laarakker<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Chief F<span class=\"_ _4\"></span>inancial Officer at Intr<span class=\"_ _4\"></span>avacc B<span class=\"_ _1\"></span>.V<span class=\"_ _1\"></span>. in the Netherlands,<span class=\"_ _1\"></span> have agreed to be co-opted as inde<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>pendent directors<span class=\"_ _4\"></span>. The co-optation is subject to r<span class=\"_ _4\"></span>atification by the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s Annual General Shareholder<span class=\"_ _4\"></span>s Meeting on May 2,<span class=\"_ _4\"></span> 2023<span class=\"_ _1\"></span>. Done on March 30<span class=\"_ _25\"></span>, 2023<span class=\"_ _1\"></span>,<span class=\"_ _1a9\"> </span>On behalf of the Board of Directors ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfNotesAndOtherExplanatoryInformationExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-31": {
   "value": "5.5.1  Reporting entity Oxurion is a public limited liability company (in Dutch: Naamloze Vennootschap) established under Belgian law with its registered office at Gaston Geenslaan 1, B-3001 Leuven, with two wholly owned subsidiaries \u2013 ThromboGenics and Oncurious (wholly owned as of December 14, 2022). Oxurion, ThromboGenics and Oncurious are biopharmaceutical companies focusing on the development of new drugs for the treatment of eye diseases and cancer. The Group has built a pipeline of drug candidates, one of which is actively in the clinic. The Group\u2019s research and development facilities are located in Belgium. The consolidated financial statements of Oxurion for the year ending December 31, 2022, include the entire Group. These consolidated financial statements were approved by the Board of Directors on March 30, 2023. Possible changes to this Annual Report can be carried out until the AGM of May 2, 2023 . Functional and presentation currency The consolidated financial statements are presented in housands of euro, which is the functional currency of Oxurion. All companies within the Group use the euro s their functional currency, except for the US subsidiary, whose functional currency is the US dollar (USD). ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGeneralInformationAboutFinancialStatementsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-2": {
   "value": "Oxurion",
   "dimensions": {
    "concept": "ifrs-full:NameOfReportingEntityOrOtherMeansOfIdentification",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-3": {
   "value": "public limited liability company",
   "dimensions": {
    "concept": "ifrs-full:LegalFormOfEntity",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-4": {
   "value": "Gaston Geenslaan 1, B-3001 Leuven,",
   "dimensions": {
    "concept": "ifrs-full:AddressOfRegisteredOfficeOfEntity",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-5": {
   "value": "Oxurion,",
   "dimensions": {
    "concept": "ifrs-full:NameOfUltimateParentOfGroup",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-6": {
   "value": "biopharmaceutical companies focusing on the development of new drugs for the treatment of eye diseases and cancer",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfNatureOfEntitysOperationsAndPrincipalActivities",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-7": {
   "value": "Belgium. ",
   "dimensions": {
    "concept": "ifrs-full:DomicileOfEntity",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-8": {
   "value": "Oxurion ",
   "dimensions": {
    "concept": "ifrs-full:NameOfParentEntity",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-53": {
   "value": "These consolidated financial statements were approved by the Board of Directors on March 30, 2023. Possible changes to this Annual Report can be carried out until the AGM of May 2, 2023 in three tranches to be called at Oxurion\u2019s full discretion. Similar to Part B of the funding program with Negma, the liquidity requirement was eliminated, and the conversion price of the shares was 80% of the lowest closing VWAP over the 15 consecutive trading days in advance of the conversion notice. On March 1, 2023, the funding program with Negma ended according to the terms of the agreements. On March 1, 2023, the Company entered into the Atlas Subscription Agreement for mandatory convertible bonds with Atlas Special Opportunities, LLC providing for up to 20 million euro in financing. Under the terms of the Subscription Agreement, Atlas has committed to subscribe to up to 20 million euro in mandatorily convert- ible bonds over a 24-month period at Oxurion\u2019s discretion. The conversion price is set at an eight percent discount to the average VWAP over the three lowest days in the ten consecutive trading days prior to the conversion notice. The Company will pay a fee of 800,000 euro in bonds, which will be issued together with the first tranche, raising the total amount of the available bonds to 20.8 million euro. The funding will be provided in nine tranches, with the first tranche including a Part A of 2.8 million euro (including the fee) and Part B of 2 million euro, and sub- sequent tranches of 2 million euro each with a cool-down period of 22 trading days between tranches (except for between Part A and Part B of the first tranche where there is no cool down period). Provided the conditions precedent are met, the decision to issue one or more tranches is at the discretion of the Company. Certain of the conditions precedents are not within the Company\u2019s control, including that the Company\u2019s total trading volume in the prior 22 trading days exceeds 1.5 million euro and that its average market capitalization exceeds 4 million euro (or 2 million euro for a 1 million euro tranche). Subsequent events On January 25, 2023, the Company has further amended its mandatory convertible bonds issuance and sub- scription agreement with the Negma Group. Before the amendment, Negma had subscribed to 11 million euro in convertible bonds. Pursuant to the amendment, Negma agreed to subscribe to up to 4 million euro (1,600 bonds) In addition, on March 1, 2023, Oxurion amended the terms of its convertible bond loan agreement with Kreos Capital and Pontifax Ventures, originally signed on November 22, 2021, (as already amended on June 30, 2022), to reduce the Company\u2019s debt by approximately 1 million euro by making a prepayment in exchange for a corresponding reduction in its cash covenant and other benefits. On March 14, 2023, Oxurion announced that given their other commitments, Dr. David Guyer and Dr. Adrienne Graves decided to resign from the Company\u2019s Board of Directors and that Dr. Anat Loewenstein, Director of the Department of Ophthalmology at Tel Aviv University, and Nathalie Laarakker, Chief Financial Officer at Intravacc B.V. in the Netherlands, have agreed to be co-opted as inde- pendent directors. The co-optation is subject to ratification by the Company\u2019s Annual General Shareholders Meeting on May 2, 2023. Done on March 30, 2023, On behalf of the Board of Directors",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEventsAfterReportingPeriodExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-9": {
   "value": "These consolidated financial statements were approved by the Board of Directors on March 30, 2023",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAuthorisationOfFinancialStatementsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-96": {
   "value": "5.5.2  Application of new and revised standards and interpretations to the consolidated financial statements New Standards, Interpretations and Amendments adopted by the Group. During 2022, the Group has adopted all the new and revised Standards and Interpretations issued by the International Accounting Standards Board (\u201cIASB\u201d) and the IFRS Interpretations Committee (\u201cIFRS IC\u201d) of the IASB as adopted by the European Union (\u201cEU\u201d) and effective for the accounting year starting on January 1, 2022. The Group has not applied any new IFRS require- ments that are not yet effective as of December 31, 2022 . The following new Standards, Interpretations and Amendments issued by the IASB and the IFRS IC as adopted by the European Union are effective for the financial period: \u2022  Amendment to IFRS 16 Leases: COVID-19-Related Rent Concessions beyond 30 June 2021 (applicable for annual periods beginning on or after 1 April 1, 2021) \u2022  Amendments to IAS 16 Property, Plant and Equipment: Proceeds before Intended Use (applicable for annual periods beginning on or after 1 January 1, 2022) \u2022  Amendments to IAS 37 Provisions, Contingent Liabilities and Contingent Assets: Onerous Contracts \u2014 Cost of Fulfilling a Contract (applicable for annual periods beginning on or after 1 January 1,2022) \u2022  Amendments to IFRS 3 Business Combinations: Reference to the Conceptual Framework (applicable for annual periods beginning on or after 1 January 1, 2022) \u2022  Annual Improvements to IFRS Standards 2018\u20132020 (applicable for annual periods beginning on or after 1 January 1, 2022) The adoption of these new standards and amendments has not led to major changes in the Group\u2019s accounting policies. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfChangesInAccountingPoliciesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-32": {
   "value": "5.5.2  Application of new and revised standards and interpretations to the consolidated financial statements New Standards, Interpretations and Amendments adopted by the Group. During 2022, the Group has adopted all the new and revised Standards and Interpretations issued by the International Accounting Standards Board (\u201cIASB\u201d) and the IFRS Interpretations Committee (\u201cIFRS IC\u201d) of the IASB as adopted by the European Union (\u201cEU\u201d) and effective for the accounting year starting on January 1, 2022. The Group has not applied any new IFRS require- ments that are not yet effective as of December 31, 2022 ",
   "dimensions": {
    "concept": "ifrs-full:StatementOfIFRSCompliance",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-80": {
   "value": "Application of new and revised standards and interpretations to the consolidated financial statements New Standards, Interpretations and Amendments adopted by the Group. During 2022, the Group has adopted all the new and revised Standards and Interpretations issued by the International Accounting Standards Board (\u201cIASB\u201d) and the IFRS Interpretations Committee (\u201cIFRS IC\u201d) of the IASB as adopted by the European Union (\u201cEU\u201d) and effective for the accounting year starting on January 1, 2022. The Group has not applied any new IFRS require- ments that are not yet effective as of December 31, 2022 . The following new Standards, Interpretations and Amendments issued by the IASB and the IFRS IC as adopted by the European Union are effective for the financial period: \u2022  Amendment to IFRS 16 Leases: COVID-19-Related Rent Concessions beyond 30 June 2021 (applicable for annual periods beginning on or after 1 April 1, 2021) \u2022  Amendments to IAS 16 Property, Plant and Equipment: Proceeds before Intended Use (applicable for annual periods beginning on or after 1 January 1, 2022) \u2022  Amendments to IAS 37 Provisions, Contingent Liabilities and Contingent Assets: Onerous Contracts \u2014 Cost of Fulfilling a Contract (applicable for annual periods beginning on or after 1 January 1,2022) \u2022  Amendments to IFRS 3 Business Combinations: Reference to the Conceptual Framework (applicable for annual periods beginning on or after 1 January 1, 2022) \u2022  Annual Improvements to IFRS Standards 2018\u20132020 (applicable for annual periods beginning on or after 1 January 1, 2022) The adoption of these new standards and amendments has not led to major changes in the Group\u2019s accounting policies. Standards and Interpretations issued but not yet effective in the current year. The Group elected not to early adopt the following new Standards, Interpretations and Amendments, which have been issued by the IASB and the IFRS IC but are not yet mandatory for December 31, 2022, reporting periods and/ or not yet adopted by the EU as per December 31, 2022 : \u2022  IFRS 17 Insurance Contracts (applicable for annual periods beginning on or after January 1, 2023) \u2022  Amendments to IFRS 17 Insurance contracts: Initial Application of IFRS 17 and IFRS 9 \u2013 Comparative Information (applicable for annual periods beginning on or after January 1, 2023) \u2022  Amendments to IAS 1 Presentation of Financial Statements: Classification of Liabilities as Current or Non-current (applicable for annual periods beginning on or after January 1, 2024 or later, but not yet endorsed in the EU) \u2022  Amendments to IAS 1 Presentation of Financial Statements and IFRS Practice Statement 2: Disclosure of Accounting Policies (applicable for annual periods beginning on or after January 1, 2023) \u2022  Amendments to IAS 8 Accounting policies, Changes in Accounting Estimates and Errors: Definition of Accounting Estimates (applicable for annual periods beginning on or after January 1, 2023) \u2022  Amendments to IAS 12 Income Taxes: Deferred Tax related to Assets and Liabilities arising from a Single Transaction (applicable for annual periods beginning on or after January 1, 2023) \u2022  Amendments to IFRS 16 Leases: Lease Liability in a Sale and Leaseback (applicable for annual periods beginning on or after January 1, 2024, but not yet endorsed in the EU) None of the new Standards, Interpretations and Amendments, which are effective for periods beginning after January 1, 2022, that have been issued by the IASB and the IFRS IC but are not yet effective as per Decembe r 31, 2022, and/or not yet adopted by the EU as per December 31, 2022, are expected to have a material effect on the Group\u2019s current or future financial statements or on foreseeable future transactions. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfChangesInAccountingPoliciesAccountingEstimatesAndErrorsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-10": {
   "value": "5.5.3  Basis of preparation and significant accounting policies The main basis adopted when preparing these consolidat- ed financial statements are set out below. (A)  STATEMENT OF COMPLIANCE These consolidated financial statements were prepared in accordance with the IFRS as issued by the IASB and adopted by the EU. The consolidated financial statements are presented in thousands of euro except per share amounts which are in euro. (B)  GOING CONCERN - MATERIAL UNCERTAINTY The Group\u2019s cash balance at December 31, 2022, of 3.6 million euro is not sufficient to fund the Group\u2019s operations during the next twelve months. However, post-closing, the Group entered into the Atlas Subscription Agreement. This committed but conditional funding would be  sufficient to fund operations during the next twelve months from the financial statement\u2019s issue date. However, given the contingent nature of this funding, the Group is actively exploring the possibility of obtaining additional funding through debt, equity, or non-dilutive funding, including the licensing of THR-149, or alternatively reducing its costs and investments so that there should be sufficient cash to continue its operations during the next twelve months. As the net-assets of the Company are below 61,500 euro (the statutory minimum amount of share capital of a Belgian public limited liability company), in accordance with article 7:229 of the BCCA, each interested party is entitled to request the competent commercial court to dissolve the Company. In such instance the court may order the dissolution of the Company or grant a grace period within which the Company is allowed to remedy the situation . Based on the above, the Board of Directors considers it may be reasonable to expect that there will be sufficient cash to continue its operations during the next twelve months, and therefore decided to continue its valuation rules under the assumption of going concern. However, there is a material uncertainty relating to going concern of the Group because it is uncertain that the above-men- tioned committed but conditional funding will be available when needed given the conditions related to the funding, and because it is not certain whether the Group will be able to timely obtain the necessary additional funding through debt, equity, or non-dilutive funding, partnering or to realize sufficient cost and investment reductions ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBasisOfPreparationOfFinancialStatementsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-54": {
   "value": "5.5.3  Basis of preparation and significant accounting policies (B)  GOING CONCERN - MATERIAL UNCERTAINTY The Group\u2019s cash balance at December 31, 2022, of 3.6 million euro is not sufficient to fund the Group\u2019s operations during the next twelve months. However, post-closing, the Group entered into the Atlas Subscription Agreement. This committed but conditional funding would be  sufficient to fund operations during the next twelve months from the financial statement\u2019s issue date. However, given the contingent nature of this funding, the Group is actively exploring the possibility of obtaining additional funding through debt, equity, or non-dilutive funding, including the licensing of THR-149, or alternatively reducing its costs and investments so that there should be sufficient cash to continue its operations during the next twelve months. As the net-assets of the Company are below 61,500 euro (the statutory minimum amount of share capital of a Belgian public limited liability company), in accordance with article 7:229 of the BCCA, each interested party is entitled to request the competent commercial court to dissolve the Company. In such instance the court may order the dissolution of the Company or grant a grace period within which the Company is allowed to remedy the situation . Based on the above, the Board of Directors considers it may be reasonable to expect that there will be sufficient cash to continue its operations during the next twelve months, and therefore decided to continue its valuation rules under the assumption of going concern. However, there is a material uncertainty relating to going concern of the Group because it is uncertain that the above-men- tioned committed but conditional funding will be available when needed given the conditions related to the funding, and because it is not certain whether the Group will be able to timely obtain the necessary additional funding through debt, equity, or non-dilutive funding, partnering or to realize sufficient cost and investment reductions . As the net-assets of the Company are below 61,500 euro (the statutory minimum amount of share capital of a Belgian public limited liability company), in accordance with article 7:229 of the BCCA, each interested party is entitled to request the competent commercial court to dissolve the Company. In such instance the court may order the disso- lution of the Company or grant a grace period within which the Company is allowed to remedy the situation. Based on the above, the Board of Directors considers it may be reasonable to expect that there will be sufficient cash to continue its operations during the next twelve months, and therefore decided to continue its valuation rules under the assumption of going concern. However, there is a material uncertainty relating to going concern of the Group because it is uncertain that the above-men- tioned committed but conditional funding will be available when needed given the conditions related to the funding, and because it is not certain whether the Group will be able to timely obtain the necessary additional funding through debt, equity or non-dilutive funding, partnering or to realize sufficient cost and investment reductions. Going Concern - material uncertainty The consolidated financial statements were prepared on a going concern basis. The Group\u2019s cash balance at December 31, 2022, of 3.6 million euro is not sufficient to fund the Group\u2019s operations during the next twelve months. However, post-closing, the Group entered into the Atlas Subscription Agreement. This committed but conditional funding would be sufficient to fund operations during the next twelve months from the financial statement\u2019s issue date. However, given the contin- gent nature of this funding, the Group is actively exploring the possibility of obtaining additional funding through debt, equity, or non-dilutive funding, including the licensing of THR-149, or alternatively reducing its costs and invest- ments so that there should be sufficient cash to continue its operations during the next twelve months. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGoingConcernExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-33": {
   "value": "(B)  GOING CONCERN - MATERIAL UNCERTAINTY The Group\u2019s cash balance at December 31, 2022, of 3.6 million euro is not sufficient to fund the Group\u2019s operations during the next twelve months. However, post-closing, the Group entered into the Atlas Subscription Agreement. This committed but conditional funding would be  sufficient to fund operations during the next twelve months from the financial statement\u2019s issue date. However, given the contingent nature of this funding, the Group is actively exploring the possibility of obtaining additional funding through debt, equity, or non-dilutive funding, including the licensing of THR-149, or alternatively reducing its costs and investments so that there should be sufficient cash to continue its operations during the next twelve months. As the net-assets of the Company are below 61,500 euro (the statutory minimum amount of share capital of a Belgian public limited liability company), in accordance with article 7:229 of the BCCA, each interested party is entitled to request the competent commercial court to dissolve the Company. In such instance the court may order the dissolution of the Company or grant a grace period within which the Company is allowed to remedy the situation . 5.5.3  Basis of preparation and significant accounting policies ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfUncertaintiesOfEntitysAbilityToContinueAsGoingConcern",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-34": {
   "value": "( C)  BASIS OF CONSOLIDATION Subsidiaries The consolidated financial statements include all the entities that are controlled by the Group. Control exists when Oxurion directly or indirectly has the ability to direct the relevant activities that significantly affect the entities\u2019 returns, has exposure or rights to variable returns and the ability to use its power over the entity to affect investors\u2019 returns, Control is presumed to exist when Oxurion owns, directly or indirectly, more than 50 percent of the voting rights linked to the share capital. The existence and effect of potential voting rights that are currently exercisable or convertible are considered when assessing whether the Group controls another entity. Applying this standard, Oxurion\u2019s subsidiaries ThromboGenics and Oncurious have been consolidated. Subsidiaries are fully consolidated from the date on which control is transferred to the Group. They are deconsolidat- ed from the date on which control ceases. A change in the ownership interest of a subsidiary, without a change in control, is accounted for as an equity transaction. Cash flows from transactions relating to changes in ownership that do not result in a change of control are classified as financing activities. Intra-group transactions, balances and unrealized profits and losses on transactions between companies in the Group are eliminated in preparing the consolidated financial statements. Unrealized losses are eliminated in the same way as unrealized profits unless the transaction indicates an impairment loss on the assets transferred. The accounting principles of the subsidiaries have been adjusted where necessary to be consistent with the princi- ples adopted by the Group. ( D)  BUSINESS COMBINATIONS AND GOODWILL Business combinations are accounted for by applying the acquisition method. The cost of an acquisition is measured as the aggregate of the consideration trans- ferred as measured at fair value on the acquisition date and the amount of any non-controlling interests in the acquiree. For each business combination, the Company elects whether to measure the non-controlling interests in the acquiree at fair value or at the proportionate share of the acquiree\u2019s identifiable net assets. Acquisition-related costs are expensed as incurred. The cost is attributed to the identifiable assets, liabilities and contingent liabilities of the acquiree. These acquired identifiable assets and (con- tingent) liabilities are initially measured at their fair value on the date of acquisition. Goodwill is initially measured at cost (being the excess of the aggregate of the consideration transferred and the amount recognized for non-controlling interests) and any previous interest held over the identifiable assets acquired and liabilities assumed. If the fair value of the net assets acquired is in excess of the aggregate consideration trans- ferred, the Company re-assesses whether it has correctly identified all of the assets acquired and all of the liabilities assumed and reviews the procedures used to measure the amounts to be recognized at the acquisition date. If the reassessment still results in an excess of the fair value of net assets acquired over the aggregate consideration transferred, then the gain is recognized in the profit or loss .",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForSubsidiariesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-55": {
   "value": "C)  BASIS OF CONSOLIDATION Subsidiaries The consolidated financial statements include all the entities that are controlled by the Group. Control exists when Oxurion directly or indirectly has the ability to direct the relevant activities that significantly affect the entities\u2019 returns, has exposure or rights to variable returns and the ability to use its power over the entity to affect investors\u2019 returns, Control is presumed to exist when Oxurion owns, directly or indirectly, more than 50 percent of the voting rights linked to the share capital. The existence and effect of potential voting rights that are currently exercisable or convertible are considered when assessing whether the Group controls another entity. Applying this standard, Oxurion\u2019s subsidiaries ThromboGenics and Oncurious have been consolidated. Subsidiaries are fully consolidated from the date on which control is transferred to the Group. They are deconsolidat- ed from the date on which control ceases. A change in the ownership interest of a subsidiary, without a change in control, is accounted for as an equity transaction. Cash flows from transactions relating to changes in ownership that do not result in a change of control are classified as financing activities. Intra-group transactions, balances and unrealized profits and losses on transactions between companies in the Group are eliminated in preparing the consolidated financial statements. Unrealized losses are eliminated in the same way as unrealized profits unless the transaction indicates an impairment loss on the assets transferred. The accounting principles of the subsidiaries have been adjusted where necessary to be consistent with the princi- ples adopted by the Group. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBasisOfConsolidationExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-97": {
   "value": "( D)  BUSINESS COMBINATIONS AND GOODWILL Business combinations are accounted for by applying the acquisition method. The cost of an acquisition is measured as the aggregate of the consideration trans- ferred as measured at fair value on the acquisition date and the amount of any non-controlling interests in the acquiree. For each business combination, the Company elects whether to measure the non-controlling interests in the acquiree at fair value or at the proportionate share of the acquiree\u2019s identifiable net assets. Acquisition-related costs are expensed as incurred. The cost is attributed to the identifiable assets, liabilities and contingent liabilities of the acquiree. These acquired identifiable assets and (con- tingent) liabilities are initially measured at their fair value on the date of acquisition. Goodwill is initially measured at cost (being the excess of the aggregate of the consideration transferred and the amount recognized for non-controlling interests) and any previous interest held over the identifiable assets acquired and liabilities assumed. If the fair value of the net assets acquired is in excess of the aggregate consideration trans- ferred, the Company re-assesses whether it has correctly identified all of the assets acquired and all of the liabilities assumed and reviews the procedures used to measure the amounts to be recognized at the acquisition date. If the reassessment still results in an excess of the fair value of net assets acquired over the aggregate consideration transferred, then the gain is recognized in the profit or loss . ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForTransactionsWithNoncontrollingInterestsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-126": {
   "value": "( D)  BUSINESS COMBINATIONS AND GOODWILL Business combinations are accounted for by applying the acquisition method. The cost of an acquisition is measured as the aggregate of the consideration trans- ferred as measured at fair value on the acquisition date and the amount of any non-controlling interests in the acquiree. For each business combination, the Company elects whether to measure the non-controlling interests in the acquiree at fair value or at the proportionate share of the acquiree\u2019s identifiable net assets. Acquisition-related costs are expensed as incurred. The cost is attributed to the identifiable assets, liabilities and contingent liabilities of the acquiree. These acquired identifiable assets and (con- tingent) liabilities are initially measured at their fair value on the date of acquisition. Goodwill is initially measured at cost (being the excess of the aggregate of the consideration transferred and the amount recognized for non-controlling interests) and any previous interest held over the identifiable assets acquired and liabilities assumed. If the fair value of the net assets acquired is in excess of the aggregate consideration trans- ferred, the Company re-assesses whether it has correctly identified all of the assets acquired and all of the liabilities assumed and reviews the procedures used to measure the amounts to be recognized at the acquisition date. If the reassessment still results in an excess of the fair value of net assets acquired over the aggregate consideration transferred, then the gain is recognized in the profit or loss ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForBusinessCombinationsAndGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-109": {
   "value": "( D)  BUSINESS COMBINATIONS AND GOODWILL Business combinations are accounted for by applying the acquisition method. The cost of an acquisition is measured as the aggregate of the consideration trans- ferred as measured at fair value on the acquisition date and the amount of any non-controlling interests in the acquiree. For each business combination, the Company elects whether to measure the non-controlling interests in the acquiree at fair value or at the proportionate share of the acquiree\u2019s identifiable net assets. Acquisition-related costs are expensed as incurred. The cost is attributed to the identifiable assets, liabilities and contingent liabilities of the acquiree. These acquired identifiable assets and (con- tingent) liabilities are initially measured at their fair value on the date of acquisition. Goodwill is initially measured at cost (being the excess of the aggregate of the consideration transferred and the amount recognized for non-controlling interests) and any previous interest held over the identifiable assets acquired and liabilities assumed. If the fair value of the net assets acquired is in excess of the aggregate consideration trans- ferred, the Company re-assesses whether it has correctly identified all of the assets acquired and all of the liabilities assumed and reviews the procedures used to measure the amounts to be recognized at the acquisition date. If the reassessment still results in an excess of the fair value of net assets acquired over the aggregate consideration transferred, then the gain is recognized in the profit or loss (K)  IMPAIRMENT LOSSES ON GOODWILL, INTANGIBLE ASSETS AND PROPERTY, PLANT AND EQUIPMENT Intangible assets with an indefinite useful life or not yet available for use and goodwill are not subject to amortiza- tion but are tested annually for impairment or if there is an indication that an asset may be impaired. Assets that are subject to amortization or depreciation are reviewed for impairment whenever events or changes in circumstances indicate that the carrying amount may not be recoverable. An impairment loss is recognized for the amount by which the carrying amount of the asset exceeds its recoverable amount. The recoverable amount is the higher of an asset\u2019s fair value less the costs to sell the asset and its value in use. These values are generally determined based on discount- ed cash flow calculations. For the purpose of assessing im- pairment, assets are grouped at the lowest levels for which here are separately identifiable cash flows (cash-generat- ng units). The impairment loss is allocated first to reduce he carrying amount of any goodwill allocated to the cash-generating unit pro rata to the carrying amount of each asset in the unit. An impairment loss recognized for goodwill cannot be reversed in a subsequent period. For assets other than goodwill, where an impairment loss is subsequently reversed, the carrying amount of the asset (cash-generating unit) is increased to the revised estimate of its recoverable value, but in such a way that the increased carrying amount does not exceed the carrying amount hat would have been determined had no impairment loss been included for the asset (cash-generating unit) in prior years. The reversal of an impairment loss is included im- mediately in the statement of profit and loss. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-56": {
   "value": "( D)  BUSINESS COMBINATIONS AND GOODWILL Business combinations are accounted for by applying the acquisition method. The cost of an acquisition is measured as the aggregate of the consideration trans- ferred as measured at fair value on the acquisition date and the amount of any non-controlling interests in the acquiree. For each business combination, the Company elects whether to measure the non-controlling interests in the acquiree at fair value or at the proportionate share of the acquiree\u2019s identifiable net assets. Acquisition-related costs are expensed as incurred. The cost is attributed to the identifiable assets, liabilities and contingent liabilities of the acquiree. These acquired identifiable assets and (con- tingent) liabilities are initially measured at their fair value on the date of acquisition. Goodwill is initially measured at cost (being the excess of the aggregate of the consideration transferred and the amount recognized for non-controlling interests) and any previous interest held over the identifiable assets acquired and liabilities assumed. If the fair value of the net assets acquired is in excess of the aggregate consideration trans- ferred, the Company re-assesses whether it has correctly identified all of the assets acquired and all of the liabilities assumed and reviews the procedures used to measure the amounts to be recognized at the acquisition date. If the reassessment still results in an excess of the fair value of net assets acquired over the aggregate consideration transferred, then the gain is recognized in the profit or loss ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForBusinessCombinationsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-11": {
   "value": "D) <span class=\"_ _41\"> </span>BUSINESS COMBINA<span class=\"_ _25\"></span>TIONS AND GOODWILL<span class=\"_ _1a9\"> </span>Business combinations are accounted for b<span class=\"_ _4\"></span>y applying the acquisition method<span class=\"_ _4\"></span>. The cost of an acquisition is measured as the aggregate of the consideration trans<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ferred as measur<span class=\"_ _4\"></span>ed at fair value on the acquisition date and the amount of any non-contro<span class=\"_ _4\"></span>lling interests in the acquiree<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or each business combination,<span class=\"_ _1\"></span> the Company elects whether to measure the non-controlling inter<span class=\"_ _4\"></span>ests in the acquiree at fair value or at the proportionate share of the acquiree\u2019<span class=\"_ _1\"></span>s identifiable net assets<span class=\"_ _4\"></span>. Acquisition-r<span class=\"_ _4\"></span>elated costs are expensed as incurr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>. The cost is attrib<span class=\"_ _4\"></span>uted to the identifiable assets<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> liabilities and contingent liabilities of the acquiree<span class=\"_ _4\"></span>. These acquired identifi<span class=\"_ _4\"></span>able assets and (con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tingent) liabilities are initially measur<span class=\"_ _4\"></span>ed at their fair value on the date of acquisition.<span class=\"_ _1a9\"> </span>Goodwill is initially measured at cost (being the excess of the aggregate of the consideration transferr<span class=\"_ _4\"></span>ed and the amount recognized for non-contro<span class=\"_ _4\"></span>lling interests) and any previous interest held o<span class=\"_ _4\"></span>ver the identifiab<span class=\"_ _4\"></span>le assets acquired and liabilities assumed<span class=\"_ _4\"></span>. If the fair value of the net assets acquired is in excess of the aggregate consideration trans<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ferred<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the Company r<span class=\"_ _4\"></span>e-assesses whether it has correctly identified all of the assets acquired and all of the liabilities assumed and reviews the procedur<span class=\"_ _4\"></span>es used to measure the amounts to be recognized at the acquisition date<span class=\"_ _4\"></span>. If the reassessment still results in an excess of the f<span class=\"_ _4\"></span>air value of net assets acquired o<span class=\"_ _4\"></span>ver the aggregate consideration transferr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> then the gain is recognized in the profit or loss<span class=\"_ _1a9\"> </span>(H) <span class=\"_ _35\"> </span>INT<span class=\"_ _25\"></span>ANGIBLE ASSETS<span class=\"_ _1a9\"> </span>Internally generated intangib<span class=\"_ _4\"></span>le assets<span class=\"_ _1a9\"> </span>Research costs ar<span class=\"_ _4\"></span>e charged to statement of profit and loss<span class=\"_ _1a9\"> </span>as incurred<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>An internally generated intangib<span class=\"_ _4\"></span>le fixed asset (see note<span class=\"_ _1a9\"> </span>5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.3) which arises from development activities undertak<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>en in the Group is recognized only if all <span class=\"_ _4\"></span>of the following<span class=\"_ _1a9\"> </span>conditions are met:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws241\">T<span class=\"_ _1\"></span>echnical possibility of making the intangible asset<span class=\"_ _1a9\"> </span></span>ready for use<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"wscf\">The intention is to complete the intangible asset and<span class=\"_ _1a9\"> </span></span>use or sell it.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Possibility of using or selling the intangible asset.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws24\">It is probable that the intangible asset will generate<span class=\"_ _1a9\"> </span></span>future economic benefit or demonstrate the existence<span class=\"_ _1a9\"> </span>of a market.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws242\">Availability of adequate tec<span class=\"_ _4\"></span>hnical and financial<span class=\"_ _1a9\"> </span></span>resources to comp<span class=\"_ _4\"></span>lete the development; and<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws199\">Availability to r<span class=\"_ _4\"></span>eliably measur<span class=\"_ _4\"></span>e the attributed expenses<span class=\"_ _1a9\"> </span></span>for the intangible asset during development.<span class=\"_ _1a9\"> </span>The patent costs for protecting the intang<span class=\"_ _4\"></span>ible assets are<span class=\"_ _1a9\"> </span>recognized as an expense<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The related milestone payments can onl<span class=\"_ _4\"></span>y be capi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>talized if they meet the criteria for recognition of an <span class=\"_ _33\"></span><span class=\"ws0\"> </span>internally generated intangib<span class=\"_ _4\"></span>le asset and is recognized at<span class=\"_ _1a9\"> </span> the moment the milestone is achieved<span class=\"_ _1a9\"> </span> Royalties paid/payab<span class=\"_ _4\"></span>le for acquired intellectual property<span class=\"_ _1a9\"> </span> are accrued for in line with the <span class=\"_ _4\"></span>underlying sales and recog<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>nized under the cost of sales<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span> Where the criteria for capitalization of the development<span class=\"_ _1a9\"> </span>expenses are not met,<span class=\"_ _1\"></span> these expenses are recorded as<span class=\"_ _1a9\"> </span>incurred during the period<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>After their initial recording on the statement of financial<span class=\"_ _1a9\"> </span>position intangible assets ar<span class=\"_ _4\"></span>e valued at cost less accumu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lated depreciation and accumulated impairment losses<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Amortization of capitalized development costs are recog<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>nized in the statement of profit and loss under \u2018Research<span class=\"_ _1a9\"> </span>and Development Expenses<span class=\"_ _4\"></span>\u2019. W<span class=\"_ _4\"></span>e r<span class=\"_ _4\"></span>efer to note 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.3 on<span class=\"_ _1a9\"> </span>\u2018Research and Development Expenses<span class=\"_ _1\"></span>\u2019.<span class=\"_ _1a9\"> </span>The capitalized costs of the patent are amortized over the<span class=\"_ _1a9\"> </span>life of the patent as of the moment that it would gener<span class=\"_ _4\"></span>ate<span class=\"_ _1a9\"> </span>revenue<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Softwar<span class=\"_ _4\"></span>e licenses are amortized over three y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Externally acquired intangib<span class=\"_ _4\"></span>le assets and outsourced<span class=\"_ _1a9\"> </span>R&amp;D costs<span class=\"_ _1a9\"> </span>Payments made to thir<span class=\"_ _4\"></span>d parties for subcontracted R&amp;D<span class=\"_ _25\"></span>,<span class=\"_ _1a9\"> </span>where there is no tr<span class=\"_ _4\"></span>ansfer of intellectual property to<span class=\"_ _1a9\"> </span>Oxurion,<span class=\"_ _4\"></span> are expensed as internal R&amp;D expenses in the<span class=\"_ _1a9\"> </span>period in which they are incur<span class=\"_ _4\"></span>red<span class=\"_ _1\"></span>. Such payments are only<span class=\"_ _1a9\"> </span>capitalized if they meet the criteria for recognition of an<span class=\"_ _1a9\"> </span>internally generated intangib<span class=\"_ _4\"></span>le asset,<span class=\"_ _4\"></span> as indicated abo<span class=\"_ _4\"></span>ve.<span class=\"_ _1a9\"> </span>Oxurion has entered into various contracts f<span class=\"_ _4\"></span>or the ac<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>quisition of licenses to intellectual property or third-par<span class=\"_ _3\"></span>ty<span class=\"_ _1a9\"> </span>know-ho<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> as disc<span class=\"_ _4\"></span>losed further in note 5<span class=\"_ _4\"></span>.8 under the key<span class=\"_ _1a9\"> </span>arrangements section. T<span class=\"_ _4\"></span>hese assets are typically acquired<span class=\"_ _1a9\"> </span>for consideration inc<span class=\"_ _4\"></span>luding upfront,<span class=\"_ _4\"></span> milestone and ro<span class=\"_ _4\"></span>yalty<span class=\"_ _1a9\"> </span>payments.<span class=\"_ _1a9\"> </span>Upfront payments made to third parties to in-license or<span class=\"_ _1a9\"> </span>acquire intellectual property rights,<span class=\"_ _4\"></span> patents<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> compounds,<span class=\"_ _1\"></span> products,<span class=\"_ _1\"></span> and know-how tec<span class=\"_ _4\"></span>hnologies to be used in R&amp;D<span class=\"_ _1a9\"> </span>activities,<span class=\"_ _1\"></span> are capitalized as costs paid for a separately<span class=\"_ _1a9\"> </span>acquired intangib<span class=\"_ _4\"></span>le asset under IAS 38<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIntangibleAssetsAndGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-57": {
   "value": "E)  FOREIGN CURRENCY TRANSLATION Functional and presentation currency The consolidated financial statements are presented in housands of euro, which is the functional currency of Oxurion. All companies within the Group use the euro as their functional currency, except for the US subsidiary, whose functional currency is the US dollar (USD). ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFunctionalCurrencyExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-58": {
   "value": "(F) <span class=\"_ _74\"> </span>REVENUE RECOGNITION<span class=\"_ _1a9\"> </span>Revenue recognition for Oxurion consists of JETREA\u00ae via<span class=\"_ _1a9\"> </span>sales to distributors<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> ro<span class=\"_ _4\"></span>yalties for JETREA\u00ae vial sales fro<span class=\"_ _1a9\"> </span>licensees,<span class=\"_ _1\"></span> occasional upfront and milestone payments<span class=\"_ _1a9\"> </span>agreed through license or collabor<span class=\"_ _4\"></span>ation contracts whic<span class=\"_ _1a9\"> </span>could include rec<span class=\"_ _4\"></span>harging of incurr<span class=\"_ _4\"></span>ed ser<span class=\"_ _3\"></span>vices of cost,<span class=\"_ _4\"></span> an<span class=\"_ _1a9\"> </span>royalties<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>JETREA\u00ae sales<span class=\"_ _1a9\"> </span>Performance obligations<span class=\"_ _1a9\"> </span>Oxurion has identified one performance obligation withi<span class=\"_ _1a9\"> </span>its customer contracts for the sale of JETREA\u00ae product,<span class=\"_ _1\"></span> i.e<span class=\"_ _1a9\"> </span>the deliver<span class=\"_ _3\"></span>y of goods to its customers.<span class=\"_ _1a9\"> </span>Timing of reven<span class=\"_ _4\"></span>ue recognition<span class=\"_ _1a9\"> </span>Oxurion recognizes reven<span class=\"_ _4\"></span>ue upon deliver<span class=\"_ _3\"></span>y of the goods to<span class=\"_ _1a9\"> </span>the customers as that is the moment the customer obtains<span class=\"_ _1a9\"> </span>control o<span class=\"_ _4\"></span>ver the goods.<span class=\"_ _1a9\"> </span>T<span class=\"_ _1\"></span>ransaction price \u2013 variab<span class=\"_ _4\"></span>le consideration<span class=\"_ _1a9\"> </span>The variable consider<span class=\"_ _4\"></span>ation is estimated at contrac<span class=\"_ _1a9\"> </span>inception and constrained until it is highly probab<span class=\"_ _4\"></span>le that significant revenue r<span class=\"_ _4\"></span>eversal in the amount of cumulativ<span class=\"_ _1a9\"> </span>revenue r<span class=\"_ _4\"></span>ecognized will not occur when the associated<span class=\"_ _1a9\"> </span>uncertainty with the variable consideration is subsequent<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ly resolved<span class=\"_ _1\"></span>. The sales prices are fixed in the contract<span class=\"_ _1a9\"> </span>How<span class=\"_ _4\"></span>ever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> some contracts pro<span class=\"_ _4\"></span>vide customers with a righ<span class=\"_ _1a9\"> </span>of return and rebates<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Oxurion accepts returns in certain limited cases,<span class=\"_ _4\"></span> and the<span class=\"_ _1a9\"> </span>need to be approved b<span class=\"_ _4\"></span>y Oxurion in order to be processe<span class=\"_ _1a9\"> </span>by the distrib<span class=\"_ _4\"></span>utors. T<span class=\"_ _4\"></span>he amount of revenue r<span class=\"_ _4\"></span>ecognized is<span class=\"_ _1a9\"> </span>the amount allocated to the satisfied performance ob<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ligation taking into account variable consideration (inc<span class=\"_ _4\"></span>l.<span class=\"_ _1a9\"> </span>expected returns)<span class=\"_ _1\"></span>. The estimated amount of variable con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>sideration is included in the tr<span class=\"_ _4\"></span>ansaction price only to th<span class=\"_ _1a9\"> </span>extent that it is highly probable that a significant r<span class=\"_ _4\"></span>eversal in the amount of cumulative revenue r<span class=\"_ _4\"></span>ecognized will not occur and is estimated on the basis of historical experi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ence and the specific terms in the individual agreements<span class=\"_ _4\"></span>. A liability is recognized for expected sales r<span class=\"_ _4\"></span>eturns,<span class=\"_ _1\"></span> rebates,<span class=\"_ _4\"></span> trade and cash discounts,<span class=\"_ _1\"></span> chargebacks or other r<span class=\"_ _4\"></span>eimburse<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments payable directl<span class=\"_ _4\"></span>y or indirectly to customers in r<span class=\"_ _4\"></span>elation to sales made until the end of the reporting period<span class=\"_ _4\"></span>. Oxurion applies the \u2018expected value method<span class=\"_ _1\"></span>\u2019 in order to estimate such return accr<span class=\"_ _4\"></span>uals,<span class=\"_ _1\"></span> and related asset. Oxurion does not offer war<span class=\"_ _4\"></span>ranties,<span class=\"_ _1\"></span> customer loyalty point programs or an<span class=\"_ _4\"></span>y material financing component to its customers<span class=\"_ _4\"></span>. Oxurion has not received any non-cash consid<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>eration. Ther<span class=\"_ _4\"></span>e are no costs to acquire customer contr<span class=\"_ _4\"></span>acts,<span class=\"_ _1\"></span> or costs to fulfil the customer contracts<span class=\"_ _4\"></span>. Ther<span class=\"_ _4\"></span>efore<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> contract balances are only r<span class=\"_ _4\"></span>ecognized to the extent of accounts re-<span class=\"_ _1a9\"> </span>ceivable<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and r<span class=\"_ _4\"></span>efund liability (return accrual)<span class=\"_ _1\"></span>. Royalty r<span class=\"_ _4\"></span>evenue on JETREA\u00ae sales<span class=\"_ _1a9\"> </span>In the case of one distributor<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> ro<span class=\"_ _4\"></span>yalties are gener<span class=\"_ _4\"></span>ated under license agreements based on licensee\u2019<span class=\"_ _1\"></span>s sales of JETREA\u00ae products to the end-customers<span class=\"_ _4\"></span>. As explained above<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> revenue from the sale of goods is recognized at the moment of deliver<span class=\"_ _3\"></span>y to the distributor<span class=\"_ _1\"></span>. However<span class=\"_ _25\"></span>, the agreement stipulates that the ro<span class=\"_ _4\"></span>yalty is earned once the distributor subsequently sells the product to the end-cus<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tomer<span class=\"_ _1\"></span>. Therefor<span class=\"_ _4\"></span>e,<span class=\"_ _1\"></span> the royalty revenue <span class=\"_ _4\"></span>is recognized once the product is sold to the end-customer<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> based on quarterly invoicing data. Ther<span class=\"_ _4\"></span>e is no specific performance obligation for Oxurion to satisfy in order to be entitled to this ro<span class=\"_ _4\"></span>yalty<span class=\"_ _25\"></span>. Occasional upfront,<span class=\"_ _4\"></span> milestone and other payments<span class=\"_ _1a9\"> </span>Revenue is only recognized at an amount that r<span class=\"_ _4\"></span>eflects the consideration to which the Gr<span class=\"_ _4\"></span>oup expects to be entitled in exchange for the satisfied performance obligation. A performance obligation is satisfied when the control of goods or ser<span class=\"_ _3\"></span>vices is transferr<span class=\"_ _4\"></span>ed to a customer<span class=\"_ _1\"></span>. Any upfront payments or license fees for which ther<span class=\"_ _4\"></span>e are subsequent performance obligations,<span class=\"_ _4\"></span> ar<span class=\"_ _4\"></span>e initially reported as deferred revenue and ar<span class=\"_ _4\"></span>e recognized as revenue when perfor<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mance obligations are satisfi<span class=\"_ _4\"></span>ed over the period of the de<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>velopment,<span class=\"_ _4\"></span> collabor<span class=\"_ _4\"></span>ation,<span class=\"_ _4\"></span> or manufacturing ob<span class=\"_ _4\"></span>ligation. W<span class=\"_ _4\"></span>e refer to note 5<span class=\"_ _1\"></span>.8 under key arrangements section<span class=\"_ _1a9\"> </span>cases when Oxurion had finalized the project earlier and did<span class=\"_ _1a9\"> </span>not spend the whole budget b<span class=\"_ _4\"></span>ut has still received the grant<span class=\"_ _1a9\"> </span>based on actual expenditure)<span class=\"_ _1\"></span>. Overall, Oxurion is confident<span class=\"_ _1a9\"> </span>that the reasonable assur<span class=\"_ _4\"></span>ance as defined in the standard<span class=\"_ _1a9\"> </span>is reached o<span class=\"_ _4\"></span>ver the course of the project for the amounts<span class=\"_ _1a9\"> </span>spent up to that moment,<span class=\"_ _4\"></span> as the only condition attac<span class=\"_ _4\"></span>hed<span class=\"_ _1a9\"> </span>to the grant is to perform R&amp;D activities in line with the<span class=\"_ _1a9\"> </span>agreed-upon scope and in line with the set budget. T<span class=\"_ _4\"></span>here<span class=\"_ _1a9\"> </span>are no other conditions attached to the gr<span class=\"_ _4\"></span>ants and the<span class=\"_ _1a9\"> </span>outcome of R&amp;D activities does not impact the decision<span class=\"_ _1a9\"> </span>of VLAIO whether the final grant will be received or not.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForRecognitionOfRevenue",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-81": {
   "value": "Transactions and balances in foreign currencies Transactions in currencies other than the functional currency of the entities are recorded at the exchange rates prevailing on the date of the transaction. On each balance sheet date, monetary assets and liabilities denominated in foreign currencies are translated into the functional currency at the exchange rates prevailing on the balance sheet date. Non-monetary assets and liabilities that are measured at historical cost in a foreign currency by the Company\u2019s entities are translated using the exchange rates at the dates of the initial transactions. Gains and losses arising on retranslation using a foreign currency are included in the net profit or loss for the period. Foreign operations On consolidation, the assets and liabilities including goodwill and fair value adjustments arising on consoli- dation of the Group\u2019s foreign operations are translated at the exchange rates prevailing on the balance sheet date. Income and expense items are translated at the average exchange rates for the period. Exchange rate differences arising, if any, are classified as equity and transferred to the Group\u2019s translation reserve. Such translation differences are recognized as income or expense items in the period in which the operation is disposed of. E)  FOREIGN CURRENCY TRANSLATION ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForForeignCurrencyTranslationExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-12": {
   "value": "Transaction price \u2013 variable consideration The variable consideration is estimated at contrac t inception and constrained until it is highly probable that a significant revenue reversal in the amount of cumulativ e revenue recognized will not occur when the associated uncertainty with the variable consideration is subsequent- ly resolved. The sales prices are fixed in the contract . However, some contracts provide customers with a righ t of return and rebates. Oxurion accepts returns in certain limited cases, and the y need to be approved by Oxurion in order to be processe d by the distributors. The amount of revenue recognized is the amount allocated to the satisfied performance ob- ligation taking into account variable consideration (incl. expected returns). The estimated amount of variable con- sideration is included in the transaction price only to th e extent that it is highly probable that a significant reversal in the amount of cumulative revenue recognized will not occur and is estimated on the basis of historical experi- ence and the specific terms in the individual agreements. A liability is recognized for expected sales returns, rebates, trade and cash discounts, chargebacks or other reimburse- ments payable directly or indirectly to customers in relation to sales made until the end of the reporting period. Oxurion applies the \u2018expected value method\u2019 in order to estimate such return accruals, and related asset. Oxurion does not offer warranties, customer loyalty point programs or any material financing component to its customers. Oxurion has not received any non-cash consid- eration. There are no costs to acquire customer contracts, or costs to fulfil the customer contracts. Therefore, contract balances are only recognized to the extent of accounts re- ceivable, and refund liability (return accrual). ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDiscountsAndRebatesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-35": {
   "value": "(<span class=\"_ _1a9\"> </span>G) <span class=\"_ _35\"> </span>RESEARCH GRANTS<span class=\"_ _1a9\"> </span>On certain specific research projects,<span class=\"_ _1\"></span> the research costs incurred ar<span class=\"_ _4\"></span>e partially reimbursed by Flander<span class=\"_ _4\"></span>s Innovation &amp; Entrepreneur<span class=\"_ _4\"></span>ship (Vlaams Instituut Innover<span class=\"_ _4\"></span>en en Ondernemen) (<span class=\"ff3 ws0\">\u201cVLAIO\u201d</span>)<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> formerly known as IWT (Agency for Innovation b<span class=\"_ _4\"></span>y Science and T<span class=\"_ _25\"></span>echnolog<span class=\"_ _3\"></span>y in Flanders \u2013 Agentschap voor Inno<span class=\"_ _4\"></span>vatie door W<span class=\"_ _4\"></span>etenschap en T<span class=\"_ _25\"></span>echnologie in Vlaanderen)<span class=\"_ _1\"></span>. In line with IAS 20 \u201cGovernment gr<span class=\"_ _4\"></span>ants<span class=\"_ _4\"></span>\u201d,<span class=\"_ _4\"></span> these gr<span class=\"_ _4\"></span>ants are recognized as government gr<span class=\"_ _4\"></span>ant income over the term of the pr<span class=\"_ _4\"></span>oject for which the gr<span class=\"_ _4\"></span>ant was given when ther<span class=\"_ _4\"></span>e is reasonable assurance that the Group will comp<span class=\"_ _4\"></span>ly with the conditions attached to them and the grants will be r<span class=\"_ _4\"></span>eceived<span class=\"_ _4\"></span>. Gr<span class=\"_ _4\"></span>ants that compensate the Company for expenses incur<span class=\"_ _4\"></span>red are deducted from the \u2018Research and Development Expenses<span class=\"_ _1\"></span>\u2019 on a systematic basis in the same period in which the expenses are incurr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Oxurion has a track r<span class=\"_ _4\"></span>ecord of more than 10 y<span class=\"_ _4\"></span>ears with these types of projects for which it r<span class=\"_ _4\"></span>eceives grants from VLAIO<span class=\"_ _25\"></span>. Grants are pr<span class=\"_ _4\"></span>ovided to Oxurion in order to support certain R&amp;D activities. A<span class=\"_ _4\"></span>ctivities,<span class=\"_ _1\"></span> related budget,<span class=\"_ _4\"></span> and types of costs that will be paid are defined in the grant agr<span class=\"_ _4\"></span>eement. Over the course of the project,<span class=\"_ _1\"></span> Oxurion repor<span class=\"_ _3\"></span>ts on the status of activities and incurred expenditur<span class=\"_ _4\"></span>e to VLAIO on a regular (quarterly) basis in order to receive grant advances<span class=\"_ _4\"></span>. The final assessment is performed by VLAIO at the end of the project in order to determine the final grant amount. Projects can take on aver<span class=\"_ _4\"></span>age between tw<span class=\"_ _4\"></span>o to five years<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Over the course of funded projects,<span class=\"_ _1\"></span> Oxurion is confident that all activities performed will not deviate from the agreed scope,<span class=\"_ _1\"></span> and that the final grant amount will not deviate from the initially agreed amount (except in a limited number o<span class=\"_ _1a9\"> </span>cases when Oxurion had finalized the project earlier and did<span class=\"_ _1a9\"> </span>not spend the whole budget b<span class=\"_ _4\"></span>ut has still received the grant<span class=\"_ _1a9\"> </span>based on actual expenditure)<span class=\"_ _1\"></span>. Overall, Oxurion is confident<span class=\"_ _1a9\"> </span>that the reasonable assur<span class=\"_ _4\"></span>ance as defined in the standard<span class=\"_ _1a9\"> </span>is reached o<span class=\"_ _4\"></span>ver the course of the project for the amounts<span class=\"_ _1a9\"> </span>spent up to that moment,<span class=\"_ _4\"></span> as the only condition attac<span class=\"_ _4\"></span>hed<span class=\"_ _1a9\"> </span>to the grant is to perform R&amp;D activities in line with the<span class=\"_ _1a9\"> </span>agreed-upon scope and in line with the set budget. T<span class=\"_ _4\"></span>here<span class=\"_ _1a9\"> </span>are no other conditions attached to the gr<span class=\"_ _4\"></span>ants and the<span class=\"_ _1a9\"> </span>outcome of R&amp;D activities does not impact the decision<span class=\"_ _1a9\"> </span>of VLAIO whether the final grant will be received or not.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForGovernmentGrants",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-82": {
   "value": "G) <span class=\"_ _35\"> </span>RESEARCH GRANTS<span class=\"_ _1a9\"> </span>On certain specific research projects,<span class=\"_ _1\"></span> the research costs incurred ar<span class=\"_ _4\"></span>e partially reimbursed by Flander<span class=\"_ _4\"></span>s Innovation &amp; Entrepreneur<span class=\"_ _4\"></span>ship (Vlaams Instituut Innover<span class=\"_ _4\"></span>en en Ondernemen) (<span class=\"ff3 ws0\">\u201cVLAIO\u201d</span>)<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> formerly known as IWT (Agency for Innovation b<span class=\"_ _4\"></span>y Science and T<span class=\"_ _25\"></span>echnolog<span class=\"_ _3\"></span>y in Flanders \u2013 Agentschap voor Inno<span class=\"_ _4\"></span>vatie door W<span class=\"_ _4\"></span>etenschap en T<span class=\"_ _25\"></span>echnologie in Vlaanderen)<span class=\"_ _1\"></span>. In line with IAS 20 \u201cGovernment gr<span class=\"_ _4\"></span>ants<span class=\"_ _4\"></span>\u201d,<span class=\"_ _4\"></span> these gr<span class=\"_ _4\"></span>ants are recognized as government gr<span class=\"_ _4\"></span>ant income over the term of the pr<span class=\"_ _4\"></span>oject for which the gr<span class=\"_ _4\"></span>ant was given when ther<span class=\"_ _4\"></span>e is reasonable assurance that the Group will comp<span class=\"_ _4\"></span>ly with the conditions attached to them and the grants will be r<span class=\"_ _4\"></span>eceived<span class=\"_ _4\"></span>. Gr<span class=\"_ _4\"></span>ants that compensate the Company for expenses incur<span class=\"_ _4\"></span>red are deducted from the \u2018Research and Development Expenses<span class=\"_ _1\"></span>\u2019 on a systematic basis in the same period in which the expenses are incurr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Oxurion has a track r<span class=\"_ _4\"></span>ecord of more than 10 y<span class=\"_ _4\"></span>ears with these types of projects for which it r<span class=\"_ _4\"></span>eceives grants from VLAIO<span class=\"_ _25\"></span>. Grants are pr<span class=\"_ _4\"></span>ovided to Oxurion in order to support certain R&amp;D activities. A<span class=\"_ _4\"></span>ctivities,<span class=\"_ _1\"></span> related budget,<span class=\"_ _4\"></span> and types of costs that will be paid are defined in the grant agr<span class=\"_ _4\"></span>eement. Over the course of the project,<span class=\"_ _1\"></span> Oxurion repor<span class=\"_ _3\"></span>ts on the status of activities and incurred expenditur<span class=\"_ _4\"></span>e to VLAIO on a regular (quarterly) basis in order to receive grant advances<span class=\"_ _4\"></span>. The final assessment is performed by VLAIO at the end of the project in order to determine the final grant amount. Projects can take on aver<span class=\"_ _4\"></span>age between tw<span class=\"_ _4\"></span>o to five years<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Over the course of funded projects,<span class=\"_ _1\"></span> Oxurion is confident that all activities performed will not deviate from the agreed scope,<span class=\"_ _1\"></span> and that the final grant amount will not deviate from the initially agreed amount (except in a limited number o<span class=\"_ _1a9\"> </span>f cases when Oxurion had finalized the project earlier and did<span class=\"_ _1a9\"> </span>not spend the whole budget b<span class=\"_ _4\"></span>ut has still received the grant<span class=\"_ _1a9\"> </span>based on actual expenditure)<span class=\"_ _1\"></span>. Overall, Oxurion is confident<span class=\"_ _1a9\"> </span>that the reasonable assur<span class=\"_ _4\"></span>ance as defined in the standard<span class=\"_ _1a9\"> </span>is reached o<span class=\"_ _4\"></span>ver the course of the project for the amounts<span class=\"_ _1a9\"> </span>spent up to that moment,<span class=\"_ _4\"></span> as the only condition attac<span class=\"_ _4\"></span>hed<span class=\"_ _1a9\"> </span>to the grant is to perform R&amp;D activities in line with the<span class=\"_ _1a9\"> </span>agreed-upon scope and in line with the set budget. T<span class=\"_ _4\"></span>here<span class=\"_ _1a9\"> </span>are no other conditions attached to the gr<span class=\"_ _4\"></span>ants and the<span class=\"_ _1a9\"> </span>outcome of R&amp;D activities does not impact the decision<span class=\"_ _1a9\"> </span>of VLAIO whether the final grant will be received or not.<span class=\"_ _1a9\"> </span>5.6.<span class=\"_ _3\"></span>3<span class=\"_ _3\"></span> <span class=\"_ _67\"> </span><span class=\"ls34 ws0\">Resear<span class=\"_ _4\"></span>ch and dev<span class=\"_ _4\"></span>elopmen<span class=\"_ _4\"></span>t expenses<span class=\"_ _1a9\"> </span></span><table class=\"s w1d5 h52\" id=\"_bca3b4a4-f263-4a7d-8730-5f4a7f135906\"><tr><td class=\"c n xf0 y5ee w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2de y5ee w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y5ee w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ef w1f2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e0 y5ef w1f3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3<span class=\"_ _4\"></span>,231<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e1 y5ef w1f4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,900<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f0 w1f5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Subcontracted R&amp;D activities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e2 y5f0 w1f6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-10<span class=\"_ _4\"></span>,668<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e3 y5f0 w1f7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-11<span class=\"_ _4\"></span>,451<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f1 w1f8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Reagents and materials<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e4 y5f1 w1f9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-88<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e5 y5f1 w1fa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-419<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f2 w1fb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Patent expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e6 y5f2 w1fc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-107<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e7 y5f2 w1ec h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-279<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f3 w1fd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Consultancy fees<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e8 y5f3 w1fe h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,2<span class=\"_ _4\"></span>46<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e9 y5f3 w1ff h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1,984<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y569 w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ea y569 w200 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-389<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2eb y569 w201 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-260<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w202 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Depreciation and amortization<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ec y56a w203 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-307<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ed y56a w204 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-584<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w205 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Government grants<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ee y56b w6b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ef y56b w206 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">84<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w207 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Income from recharge of costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f0 y5ba w208 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">47<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f1 y5ba w209 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">97<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w20a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal research and development expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f2 y515 w20b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-15<span class=\"_ _4\"></span>,986<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f3 y515 w20c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-20<span class=\"_ _4\"></span>,696<span class=\"_ _1a9\"> </span></div></td></tr></table>The decrease in emp<span class=\"_ _4\"></span>loy<span class=\"_ _4\"></span>ee benefits in 2022 compared to 2021 is mainly the result of the decision of the Compan<span class=\"_ _4\"></span>y taken in 2021 to reduce the headcount to focus on its c<span class=\"_ _4\"></span>linical assets,<span class=\"_ _1\"></span> hence the severance attributable to these reductions wer<span class=\"_ _4\"></span>e included in 2021<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The subcontracted R&amp;D activities r<span class=\"_ _4\"></span>elate to the outsourced ser<span class=\"_ _3\"></span>vices used to develop Oxurion\u2019<span class=\"_ _25\"></span>s projects in the preclinical and clinical phase<span class=\"_ _4\"></span>. The costs in 2021 and 2022 are mainl<span class=\"_ _4\"></span>y the cost related to the THR-149 and THR-687<span class=\"_ _1\"></span> clinical studies.<span class=\"_ _1a9\"> </span>In 2022,<span class=\"_ _4\"></span> other expenses w<span class=\"_ _4\"></span>ere 0<span class=\"_ _25\"></span>.4 million euro compared to<span class=\"_ _3\"></span> 0<span class=\"_ _1\"></span>.3 million euro in 2021<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The go<span class=\"_ _4\"></span>vernment grants ar<span class=\"_ _4\"></span>e grants received from the <span class=\"_ _4\"></span>VLAIO<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> formerly kno<span class=\"_ _4\"></span>wn as IWT<span class=\"_ _25\"></span>. Oxurion currently has no gr<span class=\"_ _4\"></span>ant agreement with VLAIO<span class=\"_ _25\"></span>. These grants are pro<span class=\"_ _4\"></span>vided to Oxurion to support cer<span class=\"_ _3\"></span>tain R&amp;D activities. W<span class=\"_ _4\"></span>e ref<span class=\"_ _4\"></span>er to the accounting policy in note 5<span class=\"_ _1\"></span>.5<span class=\"_ _4\"></span>.3<span class=\"_ _1\"></span>.<span class=\"_ _3\"></span> Over the course of the project,<span class=\"_ _1\"></span> Oxurion repor<span class=\"_ _3\"></span>ts on the status of<span class=\"_ _3\"></span> activities and incurred expenditur<span class=\"_ _4\"></span>e to VLAIO on a regular basis to receive grant ad<span class=\"_ _4\"></span>vances. As suc<span class=\"_ _4\"></span>h Oxurion and VLAIO follo<span class=\"_ _4\"></span>w up over the course of the pr<span class=\"_ _4\"></span>ojects that all activities performed<span class=\"_ _3\"></span> will not deviate from the agreed scope and that the final gr<span class=\"_ _4\"></span>ant amount will not deviate from the initially agreed amounts<span class=\"_ _4\"></span>. Overall,<span class=\"_ _4\"></span> Oxurion is confident that the reasonab<span class=\"_ _4\"></span>le assurance as defined in the standard is reac<span class=\"_ _4\"></span>hed over the course of the project for the amounts spent up to that moment,<span class=\"_ _1\"></span> as the only<span class=\"_ _3\"></span> condition attached to the grant is to perform R&amp;D activities in<span class=\"_ _1a9\"> </span><div class=\"t m7 he ff1 fs9 fc7 sc0 ls15 wsd6 gs146\">l<span class=\"_ _1a9\"> </span>ine with the agreed-upon scope and in line with the set b<span class=\"_ _4\"></span>udget </div><div class=\"t m7 he ff1 fs9 fc7 sc0 ls15 ws9d gs147\">and maintain a presence in the same reg<span class=\"_ _4\"></span>ion. There ar<span class=\"_ _4\"></span>e no </div><div class=\"t m7 he ff1 fs9 fc7 sc0 ls15 ws19 gs151\">other conditions attached to the grants and the outcome of </div><div class=\"t m7 he ff1 fs9 fc7 sc0 ls15 ws33 gsa0\">R&amp;D activities does not impact the decision of VLAIO whether </div><div class=\"t m7 he ff1 fs9 fc7 sc0 ls15 ws0 gsa1\">the final grant will be received or not. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws253 gsa3\">Government gr<span class=\"_ _4\"></span>ants that compensate the Company for </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wsb6 gs152\">expenses incurred and income from the r<span class=\"_ _4\"></span>echarge of costs ar<span class=\"_ _4\"></span>e </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws86 gsa4\">deducted from the researc<span class=\"_ _4\"></span>h and development expenses on </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws4a gsa5\">a systematic basis in the same period in which the expenses </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws0 gsa6\">are incurr<span class=\"_ _4\"></span>ed<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGovernmentGrantsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-132": {
   "value": "Where the criteria for capitalization of the development<span class=\"_ _1a9\"> </span>expenses are not met,<span class=\"_ _1\"></span> these expenses are recorded as<span class=\"_ _1a9\"> </span>incurred during the period<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>After their initial recording on the statement of financial<span class=\"_ _1a9\"> </span>position intangible assets ar<span class=\"_ _4\"></span>e valued at cost less accumu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lated depreciation and accumulated impairment losses<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Amortization of capitalized development costs are recog<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>nized in the statement of profit and loss under \u2018Research<span class=\"_ _1a9\"> </span>and Development Expenses<span class=\"_ _4\"></span>\u2019. W<span class=\"_ _4\"></span>e r<span class=\"_ _4\"></span>efer to note 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.3 on<span class=\"_ _1a9\"> </span>\u2018Research and Development Expenses<span class=\"_ _1\"></span>\u2019.<span class=\"_ _1a9\"> </span>The capitalized costs of the patent are amortized over the<span class=\"_ _1a9\"> </span>life of the patent as of the moment that it would gener<span class=\"_ _4\"></span>ate<span class=\"_ _1a9\"> </span>revenue<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Softwar<span class=\"_ _4\"></span>e licenses are amortized over three y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Externally acquired intangib<span class=\"_ _4\"></span>le assets and outsourced<span class=\"_ _1a9\"> </span>R&amp;D costs<span class=\"_ _1a9\"> </span>Payments made to thir<span class=\"_ _4\"></span>d parties for subcontracted R&amp;D<span class=\"_ _25\"></span>,<span class=\"_ _1a9\"> </span>where there is no tr<span class=\"_ _4\"></span>ansfer of intellectual property to<span class=\"_ _1a9\"> </span>Oxurion,<span class=\"_ _4\"></span> are expensed as internal R&amp;D expenses in the<span class=\"_ _1a9\"> </span>period in which they are incur<span class=\"_ _4\"></span>red<span class=\"_ _1\"></span>. Such payments are only<span class=\"_ _1a9\"> </span>capitalized if they meet the criteria for recognition of an<span class=\"_ _1a9\"> </span>internally generated intangib<span class=\"_ _4\"></span>le asset,<span class=\"_ _4\"></span> as indicated abo<span class=\"_ _4\"></span>ve.<span class=\"_ _1a9\"> </span>Oxurion has entered into various contracts f<span class=\"_ _4\"></span>or the ac<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>quisition of licenses to intellectual property or third-par<span class=\"_ _3\"></span>ty<span class=\"_ _1a9\"> </span>know-ho<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> as disc<span class=\"_ _4\"></span>losed further in note 5<span class=\"_ _4\"></span>.8 under the key<span class=\"_ _1a9\"> </span>arrangements section. T<span class=\"_ _4\"></span>hese assets are typically acquired<span class=\"_ _1a9\"> </span>for consideration inc<span class=\"_ _4\"></span>luding upfront,<span class=\"_ _4\"></span> milestone and ro<span class=\"_ _4\"></span>yalty<span class=\"_ _1a9\"> </span>payments.<span class=\"_ _1a9\"> </span>Upfront payments made to third parties to in-license or<span class=\"_ _1a9\"> </span>acquire intellectual property rights,<span class=\"_ _4\"></span> patents<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> compounds,<span class=\"_ _1\"></span> products,<span class=\"_ _1\"></span> and know-how tec<span class=\"_ _4\"></span>hnologies to be used in R&amp;D<span class=\"_ _1a9\"> </span>activities,<span class=\"_ _1\"></span> are capitalized as costs paid for a separately<span class=\"_ _1a9\"> </span>acquired intangib<span class=\"_ _4\"></span>le asset under IAS 38<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>H) <span class=\"_ _35\"> </span>INT<span class=\"_ _25\"></span>ANGIBLE ASSETS<span class=\"_ _1a9\"> </span>Internally generated intangib<span class=\"_ _4\"></span>le assets<span class=\"_ _1a9\"> </span>Research costs ar<span class=\"_ _4\"></span>e charged to statement of profit and loss<span class=\"_ _1a9\"> </span>as incurred<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>An internally generated intangib<span class=\"_ _4\"></span>le fixed asset (see note<span class=\"_ _1a9\"> </span>5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.3) which arises from development activities undertak<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>en in the Group is recognized only if all <span class=\"_ _4\"></span>of the following<span class=\"_ _1a9\"> </span>conditions are met:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws241\">T<span class=\"_ _1\"></span>echnical possibility of making the intangible asset<span class=\"_ _1a9\"> </span></span>ready for use<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"wscf\">The intention is to complete the intangible asset and<span class=\"_ _1a9\"> </span></span>use or sell it.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Possibility of using or selling the intangible asset.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws24\">It is probable that the intangible asset will generate<span class=\"_ _1a9\"> </span></span>future economic benefit or demonstrate the existence<span class=\"_ _1a9\"> </span>of a market.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws242\">Availability of adequate tec<span class=\"_ _4\"></span>hnical and financial<span class=\"_ _1a9\"> </span></span>resources to comp<span class=\"_ _4\"></span>lete the development; and<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws199\">Availability to r<span class=\"_ _4\"></span>eliably measur<span class=\"_ _4\"></span>e the attributed expenses<span class=\"_ _1a9\"> </span></span>for the intangible asset during development.<span class=\"_ _1a9\"> </span>The patent costs for protecting the intang<span class=\"_ _4\"></span>ible assets are<span class=\"_ _1a9\"> </span>ecognized as an expense<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The related milestone payments can onl<span class=\"_ _4\"></span>y be capi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>talized if they meet the criteria for recognition of an <span class=\"_ _33\"></span><span class=\"ws0\"> </span>internally generated intangib<span class=\"_ _4\"></span>le asset and is recognized at<span class=\"_ _1a9\"> </span> the moment the milestone is achieved<span class=\"_ _1a9\"> </span> Royalties paid/payab<span class=\"_ _4\"></span>le for acquired intellectual property<span class=\"_ _1a9\"> </span> are accrued for in line with the <span class=\"_ _4\"></span>underlying sales and recog<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>nized under the cost of sales<span class=\"_ _1a9\"> </span>each asset in the unit. An impairment loss recognized f<span class=\"_ _4\"></span>or<span class=\"_ _1a9\"> </span>goodwill cannot be rever<span class=\"_ _4\"></span>sed in a subsequent period<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or<span class=\"_ _1a9\"> </span>assets other than goodwill,<span class=\"_ _4\"></span> wher<span class=\"_ _4\"></span>e an impairment loss is<span class=\"_ _1a9\"> </span>subsequently reversed<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the carr<span class=\"_ _3\"></span>ying amount of the asset<span class=\"_ _1a9\"> </span>(cash-generating unit) is increased to the r<span class=\"_ _4\"></span>evised estimate<span class=\"_ _1a9\"> </span>of its reco<span class=\"_ _4\"></span>verable value<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> but in such a way that the incr<span class=\"_ _4\"></span>eased<span class=\"_ _1a9\"> </span>carr<span class=\"_ _3\"></span>ying amount does not exceed the carr<span class=\"_ _3\"></span>ying amount<span class=\"_ _1a9\"> </span>that would ha<span class=\"_ _4\"></span>ve been determined had no impairment loss<span class=\"_ _1a9\"> </span>been included for the asset (cash-gener<span class=\"_ _4\"></span>ating unit) in prior<span class=\"_ _1a9\"> </span>years<span class=\"_ _4\"></span>. The r<span class=\"_ _4\"></span>eversal of an impairment loss is included im<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mediately in the statement of profit and loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>K) <span class=\"_ _56\"> </span>IMP<span class=\"_ _1\"></span>AIRMENT L<span class=\"_ _1\"></span>OSSES ON GOODWILL,<span class=\"_ _4\"></span> INT<span class=\"_ _25\"></span>ANGIBLE ASSETS AND PROPERTY<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> The tax curr<span class=\"_ _4\"></span>ently payable is based on taxable pr<span class=\"_ _4\"></span>ofit for<span class=\"_ _1a9\"> </span> PLANT AND EQUIPMENT<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIntangibleAssetsOtherThanGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-136": {
   "value": "Where the criteria for capitalization of the development<span class=\"_ _1a9\"> </span>expenses are not met,<span class=\"_ _1\"></span> these expenses are recorded as<span class=\"_ _1a9\"> </span>incurred during the period<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>After their initial recording on the statement of financial<span class=\"_ _1a9\"> </span>position intangible assets ar<span class=\"_ _4\"></span>e valued at cost less accumu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lated depreciation and accumulated impairment losses<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Amortization of capitalized development costs are recog<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>nized in the statement of profit and loss under \u2018Research<span class=\"_ _1a9\"> </span>and Development Expenses<span class=\"_ _4\"></span>\u2019. W<span class=\"_ _4\"></span>e r<span class=\"_ _4\"></span>efer to note 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.3 on<span class=\"_ _1a9\"> </span>\u2018Research and Development Expenses<span class=\"_ _1\"></span>\u2019.<span class=\"_ _1a9\"> </span>The capitalized costs of the patent are amortized over the<span class=\"_ _1a9\"> </span>life of the patent as of the moment that it would gener<span class=\"_ _4\"></span>ate<span class=\"_ _1a9\"> </span>revenue<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Softwar<span class=\"_ _4\"></span>e licenses are amortized over three y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Externally acquired intangib<span class=\"_ _4\"></span>le assets and outsourced<span class=\"_ _1a9\"> </span>R&amp;D costs<span class=\"_ _1a9\"> </span>Payments made to thir<span class=\"_ _4\"></span>d parties for subcontracted R&amp;D<span class=\"_ _25\"></span>,<span class=\"_ _1a9\"> </span>where there is no tr<span class=\"_ _4\"></span>ansfer of intellectual property to<span class=\"_ _1a9\"> </span>Oxurion,<span class=\"_ _4\"></span> are expensed as internal R&amp;D expenses in the<span class=\"_ _1a9\"> </span>period in which they are incur<span class=\"_ _4\"></span>red<span class=\"_ _1\"></span>. Such payments are only<span class=\"_ _1a9\"> </span>capitalized if they meet the criteria for recognition of an<span class=\"_ _1a9\"> </span>internally generated intangib<span class=\"_ _4\"></span>le asset,<span class=\"_ _4\"></span> as indicated abo<span class=\"_ _4\"></span>ve.<span class=\"_ _1a9\"> </span>Oxurion has entered into various contracts f<span class=\"_ _4\"></span>or the ac<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>quisition of licenses to intellectual property or third-par<span class=\"_ _3\"></span>ty<span class=\"_ _1a9\"> </span>know-ho<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> as disc<span class=\"_ _4\"></span>losed further in note 5<span class=\"_ _4\"></span>.8 under the key<span class=\"_ _1a9\"> </span>arrangements section. T<span class=\"_ _4\"></span>hese assets are typically acquired<span class=\"_ _1a9\"> </span>for consideration inc<span class=\"_ _4\"></span>luding upfront,<span class=\"_ _4\"></span> milestone and ro<span class=\"_ _4\"></span>yalty<span class=\"_ _1a9\"> </span>payments.<span class=\"_ _1a9\"> </span>Upfront payments made to third parties to in-license or<span class=\"_ _1a9\"> </span>acquire intellectual property rights,<span class=\"_ _4\"></span> patents<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> compounds,<span class=\"_ _1\"></span> products,<span class=\"_ _1\"></span> and know-how tec<span class=\"_ _4\"></span>hnologies to be used in R&amp;D<span class=\"_ _1a9\"> </span>activities,<span class=\"_ _1\"></span> are capitalized as costs paid for a separately<span class=\"_ _1a9\"> </span>acquired intangib<span class=\"_ _4\"></span>le asset under IAS 38<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>H) <span class=\"_ _35\"> </span>INT<span class=\"_ _25\"></span>ANGIBLE ASSETS<span class=\"_ _1a9\"> </span>Internally generated intangib<span class=\"_ _4\"></span>le assets<span class=\"_ _1a9\"> </span>Research costs ar<span class=\"_ _4\"></span>e charged to statement of profit and loss<span class=\"_ _1a9\"> </span>as incurred<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>An internally generated intangib<span class=\"_ _4\"></span>le fixed asset (see note<span class=\"_ _1a9\"> </span>5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.3) which arises from development activities undertak<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>en in the Group is recognized only if all <span class=\"_ _4\"></span>of the following<span class=\"_ _1a9\"> </span>conditions are met:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws241\">T<span class=\"_ _1\"></span>echnical possibility of making the intangible asset<span class=\"_ _1a9\"> </span></span>ready for use<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"wscf\">The intention is to complete the intangible asset and<span class=\"_ _1a9\"> </span></span>use or sell it.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Possibility of using or selling the intangible asset.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws24\">It is probable that the intangible asset will generate<span class=\"_ _1a9\"> </span></span>future economic benefit or demonstrate the existence<span class=\"_ _1a9\"> </span>of a market.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws242\">Availability of adequate tec<span class=\"_ _4\"></span>hnical and financial<span class=\"_ _1a9\"> </span></span>resources to comp<span class=\"_ _4\"></span>lete the development; and<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws199\">Availability to r<span class=\"_ _4\"></span>eliably measur<span class=\"_ _4\"></span>e the attributed expenses<span class=\"_ _1a9\"> </span></span>for the intangible asset during development.<span class=\"_ _1a9\"> </span>The patent costs for protecting the intang<span class=\"_ _4\"></span>ible assets are<span class=\"_ _1a9\"> </span>ecognized as an expense<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>81<span class=\"_ _1a9\"> </span>OXURION<span class=\"ff7 ws0\"> ANNU<span class=\"_ _4\"></span>AL REPORT 2022<span class=\"_ _1a9\"> </span></span>The related milestone payments can onl<span class=\"_ _4\"></span>y be capi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>talized if they meet the criteria for recognition of an <span class=\"_ _33\"></span><span class=\"ws0\"> </span>internally generated intangib<span class=\"_ _4\"></span>le asset and is recognized at<span class=\"_ _1a9\"> </span> the moment the milestone is achieved<span class=\"_ _1a9\"> </span> Royalties paid/payab<span class=\"_ _4\"></span>le for acquired intellectual property<span class=\"_ _1a9\"> </span> are accrued for in line with the <span class=\"_ _4\"></span>underlying sales and recog<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>nized under the cost of sales<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span> (I) <span class=\"_ _38\"> </span>PROPERTY<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> PLANT AND EQUIPMENT<span class=\"_ _1a9\"> </span>Property<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> p<span class=\"_ _4\"></span>lant,<span class=\"_ _4\"></span> and equipment are inc<span class=\"_ _4\"></span>luded at the histor<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ical cost (material costs only) less accumulated depreci<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ation and impairment. Subsequent costs are included in<span class=\"_ _1a9\"> </span> the carr<span class=\"_ _3\"></span>ying amount for the asset or booked as a separate<span class=\"_ _1a9\"> </span> asset as appropriate<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> but onl<span class=\"_ _4\"></span>y when it is probable that<span class=\"_ _1a9\"> </span> future economic benefits associated with the item will be<span class=\"_ _1a9\"> </span> generated for the Group and the cost price of the item can<span class=\"_ _1a9\"> </span> be measured reliab<span class=\"_ _4\"></span>ly<span class=\"_ _25\"></span>. All other repair and maintenance<span class=\"_ _1a9\"> </span> costs are char<span class=\"_ _4\"></span>ged to the statement of profit and loss as<span class=\"_ _1a9\"> </span> incurred<span class=\"_ _1\"></span>. The cost of assets retired or otherwise disposed<span class=\"_ _1a9\"> </span> of<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> and the related accumulated depr<span class=\"_ _4\"></span>eciation,<span class=\"_ _4\"></span> are inc<span class=\"_ _4\"></span>luded<span class=\"_ _1a9\"> </span> in the statement of profit and loss as part of the gain or<span class=\"_ _1a9\"> </span> loss on disposal in the year of disposal. Gains and losses<span class=\"_ _1a9\"> </span> on disposal of property<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> p<span class=\"_ _4\"></span>lant and equipment are included<span class=\"_ _1a9\"> </span> in other income or expense.<span class=\"_ _1a9\"> </span>Depreciation is calculated using the straight-line method to<span class=\"_ _1a9\"> </span> allocate the cost of property<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> p<span class=\"_ _4\"></span>lant and equipment to their<span class=\"_ _1a9\"> </span> estimated residual values o<span class=\"_ _4\"></span>ver their estimated useful lives<span class=\"_ _1a9\"> </span> as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Proper<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>, p<span class=\"_ _4\"></span>lant and equipment: three to five y<span class=\"_ _4\"></span>ears<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>F<span class=\"_ _4\"></span>urniture and fittings: thr<span class=\"_ _4\"></span>ee to five years<span class=\"_ _1a9\"> </span>The depreciation methods<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> useful life and r<span class=\"_ _4\"></span>esidual value<span class=\"_ _1a9\"> </span> are revalued on eac<span class=\"_ _4\"></span>h reporting date.<span class=\"_ _1a9\"> </span>W<span class=\"_ _4\"></span>e refer to the notes 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.3 until 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.5 for the disclosures<span class=\"_ _1a9\"> </span> of where the depreciation c<span class=\"_ _4\"></span>harges are r<span class=\"_ _4\"></span>ecognized in the<span class=\"_ _1a9\"> </span> statement of profit and loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Subsequent costs<span class=\"_ _1a9\"> </span>The cost of rep<span class=\"_ _4\"></span>lacing part of an item of proper<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>, p<span class=\"_ _4\"></span>lant<span class=\"_ _1a9\"> </span> and equipment is recognized in the carrying amount of<span class=\"_ _1a9\"> </span> the item if it is probable that the futur<span class=\"_ _4\"></span>e economic benefits<span class=\"_ _1a9\"> </span> embodied within the item replaced will fl<span class=\"_ _4\"></span>ow to the Group<span class=\"_ _1a9\"> </span> and its cost can be measured reliab<span class=\"_ _4\"></span>ly<span class=\"_ _25\"></span>. The carr<span class=\"_ _3\"></span>ying amount<span class=\"_ _1a9\"> </span> of the replaced item is der<span class=\"_ _4\"></span>ecognized<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he costs of the day-<span class=\"_ _1a9\"> </span>to-day ser<span class=\"_ _3\"></span>vicing of proper<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> plant and equipment are r<span class=\"_ _4\"></span>ec<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ognized in profit or loss as incurred<span class=\"_ _1a9\"> </span><span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>(J) <span class=\"_ _31\"> </span>LEASED ASSETS<span class=\"_ _1a9\"> </span>IFRS 16<span class=\"_ _1a9\"> </span>The Group leases an office<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> copiers,<span class=\"_ _4\"></span> and cars<span class=\"_ _4\"></span>. Rental<span class=\"_ _1a9\"> </span> contracts are typicall<span class=\"_ _4\"></span>y made for fixed periods of 3 to 4<span class=\"_ _1a9\"> </span> years b<span class=\"_ _4\"></span>ut may have extension options as described belo<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span> Lease terms are negotiated on an individual basis and<span class=\"_ _1a9\"> </span> contain a wide range of differ<span class=\"_ _4\"></span>ent terms and conditions.<span class=\"_ _1a9\"> </span> The lease agreements do not impose an<span class=\"_ _4\"></span>y co<span class=\"_ _4\"></span>venants,<span class=\"_ _1\"></span> but<span class=\"_ _1a9\"> </span> leased assets may not be used as security for borro<span class=\"_ _4\"></span>wing<span class=\"_ _1a9\"> </span> purposes<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Leases are recognized as right-of-use assets and a cor<span class=\"_ _25\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>responding liability at the date at which the leased asset<span class=\"_ _1a9\"> </span> is available f<span class=\"_ _4\"></span>or use by the Group<span class=\"_ _1\"></span>. Each lease payment<span class=\"_ _1a9\"> </span> is allocated between the liability and finance cost. T<span class=\"_ _4\"></span>he<span class=\"_ _1a9\"> </span> finance cost is charged to profit or loss o<span class=\"_ _4\"></span>ver the lease<span class=\"_ _1a9\"> </span> period so as to produce a constant periodic rate of inter<span class=\"_ _4\"></span>est<span class=\"_ _1a9\"> </span> on the remaining balance of the liability for eac<span class=\"_ _4\"></span>h period<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> The right-of-use asset is depreciated o<span class=\"_ _4\"></span>ver the shorter of<span class=\"_ _1a9\"> </span> these asset\u2019<span class=\"_ _1\"></span>s useful life and the lease term on a straight-<span class=\"_ _1a9\"> </span>line basis<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>Assets and liabilities arising from a lease are initially<span class=\"_ _1a9\"> </span> measured on a present value basis<span class=\"_ _4\"></span>. Lease liabilities are<span class=\"_ _1a9\"> </span> exclusively composed of fixed payments less an<span class=\"_ _4\"></span>y lease<span class=\"_ _1a9\"> </span> incentives receivable<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws31 gs53\">The lease payments are discounted using the lessee\u2019<span class=\"_ _25\"></span>s in<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws4a gs54\">there are separ<span class=\"_ _4\"></span>ately identifiab<span class=\"_ _4\"></span>le cash flows (cash-gener<span class=\"_ _4\"></span>at<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws29 gs86\">cremental borro<span class=\"_ _4\"></span>wing rate<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> being the rate that the lessee<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws72 gs87\">ing units)<span class=\"_ _4\"></span>. The impairment loss is allocated fir<span class=\"_ _4\"></span>st to reduce<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws105 gs88\">would ha<span class=\"_ _4\"></span>ve to pay to borrow the funds necessary to obtain<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws49 gs18\">the carr<span class=\"_ _3\"></span>ying amount of any goodwill allocated to the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf5 gs89\">an asset of similar value in a similar economic environ<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws179 gs19\">cash-generating unit pro r<span class=\"_ _4\"></span>ata to the carr<span class=\"_ _3\"></span>ying amount of<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs56\">ment with similar terms and conditions.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1c4 gs1a\">each asset in the unit. An impairment loss recognized f<span class=\"_ _4\"></span>or<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa8 gs1b\">goodwill cannot be rever<span class=\"_ _4\"></span>sed in a subsequent period<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws14c gs58\">Right-of-use assets are measured at cost comprising the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws136 gs59\">assets other than goodwill,<span class=\"_ _4\"></span> wher<span class=\"_ _4\"></span>e an impairment loss is<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsd6 gs5a\">amount of the initial measurement of the lease liability and<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1c9 gs1c\">subsequently reversed<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the carr<span class=\"_ _3\"></span>ying amount of the asset<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws57 gs5b\">any lease payments made at or befor<span class=\"_ _4\"></span>e the commence<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsab gs1d\">(cash-generating unit) is increased to the r<span class=\"_ _4\"></span>evised estimate<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs8a\">ment date.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws44 gs1e\">of its reco<span class=\"_ _4\"></span>verable value<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> but in such a way that the incr<span class=\"_ _4\"></span>eased<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws125 gs1f\">carr<span class=\"_ _3\"></span>ying amount does not exceed the carr<span class=\"_ _3\"></span>ying amount<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws14f gs8c\">Payments associated with short-term leases and leases of<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws33 gs8d\">that would ha<span class=\"_ _4\"></span>ve been determined had no impairment loss<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsd9 gs5e\">low-value assets ar<span class=\"_ _4\"></span>e recognized on a straight-line basis as<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb4 gs20\">been included for the asset (cash-gener<span class=\"_ _4\"></span>ating unit) in prior<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsba gs5f\">an expense in profit or loss<span class=\"_ _4\"></span>. Short-term leases comprise<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws65 gs60\">years<span class=\"_ _4\"></span>. The r<span class=\"_ _4\"></span>eversal of an impairment loss is included im<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws155 gs61\">some car leases and are leases with a lease term of tw<span class=\"_ _4\"></span>elve<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs62\">mediately in the statement of profit and loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws134 gs63\">months or less. Lo<span class=\"_ _4\"></span>w-value assets only comprise of one<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs65\">copier<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h17 ff2 fs9 fc7 sc0 ls0 ws0 gsb1\">(L) <span class=\"_ _72\"> </span>INCOME T<span class=\"_ _25\"></span>AXES<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs68\">W<span class=\"_ _4\"></span>e refer to note 5<span class=\"_ _1\"></span>.7<span class=\"_ _25\"></span>.2 for more information.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws35 gs26\">Income tax expenses in the statement of profit and loss<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs69\">comprise the tax currently payab<span class=\"_ _4\"></span>le.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h17 ff2 fs9 fc7 sc0 ls0 ws0 gs6a\">(K) <span class=\"_ _56\"> </span>IMP<span class=\"_ _1\"></span>AIRMENT L<span class=\"_ _1\"></span>OSSES ON GOODWILL,<span class=\"_ _4\"></span> </div><div class=\"t m0 h17 ff2 fs9 fc7 sc0 ls0 ws0 gsb2\">INT<span class=\"_ _25\"></span>ANGIBLE ASSETS AND PROPERTY<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wse1 gs6d\">The tax curr<span class=\"_ _4\"></span>ently payable is based on taxable pr<span class=\"_ _4\"></span>ofit for<span class=\"_ _1a9\"> </span> </div><div class=\"t m0 h17 ff2 fs9 fc7 sc0 ls0 ws0 gsb3\">PLANT AND EQUIPMENT<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws100 gs2a\">the year<span class=\"_ _1\"></span>. T<span class=\"_ _25\"></span>axable profit differs from net pr<span class=\"_ _4\"></span>ofit as reported<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws7b gs93\">on the statement of profit and loss because it excludes<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws15a gsa9\">Intangible assets with an indefinite useful life or <span class=\"_ _4\"></span>not yet<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws63 gs94\">items of income or expense that are taxable or deductib<span class=\"_ _4\"></span>le<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws120 gs71\">available f<span class=\"_ _4\"></span>or use and goodwill are not subject to amortiza<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws12f gs72\">in other years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and it further excludes items that are never<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws33 gs73\">tion but are tested ann<span class=\"_ _4\"></span>ually for impairment or if there is an<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws115 gs2e\">taxable or deductible<span class=\"_ _4\"></span>. The Gr<span class=\"_ _4\"></span>oup<span class=\"_ _1\"></span>\u2019<span class=\"_ _4\"></span>s liability for cur<span class=\"_ _4\"></span>rent tax<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs96\">indication that an asset may be impaired<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1b5 gs74\">is calculated using tax rates that have been enacted or<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs76\">substantially enacted on the reporting date.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws22 gs98\">Assets that are subject to amortization or depreciation are<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws128 gsf\">review<span class=\"_ _4\"></span>ed for impairment whenever events or changes in<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws172 gs31\">Deferred tax is the tax expected to be payab<span class=\"_ _4\"></span>le or reco<span class=\"_ _4\"></span>v<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws2c gs78\">circumstances indicate that the carr<span class=\"_ _3\"></span>ying amount may not<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsea gs32\">erable on diff<span class=\"_ _4\"></span>erences betw<span class=\"_ _4\"></span>een the carr<span class=\"_ _3\"></span>ying amounts of<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs79\">be reco<span class=\"_ _4\"></span>verable<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws15d gs33\">assets and liabilities in the financial statements and the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws245 gs9b\">corresponding tax bases used in the computation of<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1b6 gs12\">An impairment loss is recognized for the amount b<span class=\"_ _4\"></span>y which<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsc5 gs7b\">taxable profit and is accounted for using the balance sheet<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf9 gs13\">the carr<span class=\"_ _3\"></span>ying amount of the asset exceeds its recover<span class=\"_ _4\"></span>able<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs7c\">method<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws103 gs7d\">amount. The reco<span class=\"_ _4\"></span>verab<span class=\"_ _4\"></span>le amount is the higher of an asset\u2019<span class=\"_ _1\"></span>s<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws80 gs14\">fair value less the costs to sell the asset and its value in use<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1bd gs7f\">Deferred tax liabilities ar<span class=\"_ _4\"></span>e generally r<span class=\"_ _4\"></span>ecognized for all<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1b gs80\">These values are gener<span class=\"_ _4\"></span>ally determined based on discount<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws8a gs81\">taxable temporary differences. Def<span class=\"_ _4\"></span>erred tax assets are r<span class=\"_ _4\"></span>ec<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb6 gs82\">ed cash flow calculations<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or the purpose of assessing im<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws11f gs83\">ognized to the extent that it is probable that taxab<span class=\"_ _4\"></span>le profits<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws162 gs17\">pairment,<span class=\"_ _4\"></span> assets are gr<span class=\"_ _4\"></span>ouped at the low<span class=\"_ _4\"></span>est levels for which<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsd5 gs84\">will be available against whic<span class=\"_ _4\"></span>h deductible temporary<span class=\"_ _1a9\"> </span></div>83<span class=\"_ _1a9\"> </span>OXURION<span class=\"ff7 ws0\"> ANNU<span class=\"_ _4\"></span>AL REPORT 2022<span class=\"_ _1a9\"> </span></span>differences can be utilized<span class=\"_ _1\"></span>. Such assets and liabilities are not recognized if the temporary difference arises from goodwill (or negative goodwill) or fr<span class=\"_ _4\"></span>om the initial recogni<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion (other than in a business combination) of other assets and liabilities in a transaction that affects neither the tax profit nor the accounting profit.<span class=\"_ _1a9\"> </span>Deferred tax liabilities ar<span class=\"_ _4\"></span>e recognized for taxab<span class=\"_ _4\"></span>le temporar<span class=\"_ _3\"></span>y differences arising on in<span class=\"_ _4\"></span>vestments in subsidiaries and as<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>sociates,<span class=\"_ _1\"></span> and interests in joint ventures,<span class=\"_ _1\"></span> except where the Group is able to contro<span class=\"_ _4\"></span>l the reversal of the temporary dif<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ference and it is probab<span class=\"_ _4\"></span>le that the temporary difference will not reverse in the for<span class=\"_ _4\"></span>eseeable future<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Deferred tax is calculated at the tax r<span class=\"_ _4\"></span>ates that are expected to apply in the period when the liability is settled<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> or the asset realized<span class=\"_ _1\"></span>. Deferred tax is charged or cr<span class=\"_ _4\"></span>edited in the statement of profit and loss,<span class=\"_ _1\"></span> except when it relates to items charged or cr<span class=\"_ _4\"></span>edited directly to equity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> in whic<span class=\"_ _4\"></span>h case the deferred tax is also dealt with in equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>Deferred tax assets and liabilities ar<span class=\"_ _4\"></span>e offset when they relate to income taxes levied b<span class=\"_ _4\"></span>y the same taxation authority and the Group intends to settle its current tax assets and liabilities on a net basis<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>The Group also r<span class=\"_ _4\"></span>eceives tax credits for R&amp;D expenses<span class=\"_ _4\"></span>. These R&amp;D expenses are r<span class=\"_ _4\"></span>ecorded through P&amp;L under IFRS in the line item \u2018Research and development expenses<span class=\"_ _1\"></span>\u2019 as the expenses do not meet the requirements in IAS 38 to be capitalized<span class=\"_ _4\"></span>. The tax cr<span class=\"_ _4\"></span>edit is not subject to unfulfilled conditions. In case ther<span class=\"_ _4\"></span>e is insufficient tax against which to set off the tax credit,<span class=\"_ _1\"></span> the credit can be carried for<span class=\"_ _3\"></span>ward during 5 consecutive assessment years<span class=\"_ _4\"></span>. The tax cr<span class=\"_ _4\"></span>edit re<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ceivable is presented f<span class=\"_ _4\"></span>or the non-current portion in the line item \u2018Non-current tax cr<span class=\"_ _4\"></span>edit\u2019 and for the current portion in the line item \u2018Current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _4\"></span>\u2019 of the consolidated statement of financial position. At the end of 5 consecu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tive assessment years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the balance of the unused tax cr<span class=\"_ _4\"></span>edit is received in cash from the go<span class=\"_ _4\"></span>vernment. The income from those tax credits is inc<span class=\"_ _4\"></span>luded in the line item \u2018Other operating income\u2019 in the statement of profit and loss<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>(M) <span class=\"_ _7d\"> </span>EMPL<span class=\"_ _4\"></span>O<span class=\"_ _4\"></span>YEE BENEFIT PLAN<span class=\"_ _1a9\"> </span>Short-term employee benefits<span class=\"_ _1a9\"> </span>Liabilities for wages and salaries that ar<span class=\"_ _4\"></span>e expected to be<span class=\"_ _1a9\"> </span> settled wholly within tw<span class=\"_ _4\"></span>elve months after the end of the<span class=\"_ _1a9\"> </span> period in which the emplo<span class=\"_ _4\"></span>y<span class=\"_ _4\"></span>ees render the related service<span class=\"_ _1a9\"> </span> are recognized in r<span class=\"_ _4\"></span>espect of emplo<span class=\"_ _4\"></span>yees<span class=\"_ _1\"></span>\u2019 ser<span class=\"_ _23\"></span>vices up to<span class=\"_ _1a9\"> </span> the end of the reporting period and are measured at<span class=\"_ _1a9\"> </span> the amounts expected to be paid when the liabilities are<span class=\"_ _1a9\"> </span> settled<span class=\"_ _4\"></span>. The liabilities ar<span class=\"_ _4\"></span>e presented as curr<span class=\"_ _4\"></span>ent emplo<span class=\"_ _4\"></span>yee<span class=\"_ _1a9\"> </span> benefit obligations in the statement of financial position.<span class=\"_ _1a9\"> </span>Pension benefits<span class=\"_ _1a9\"> </span>Starting July 1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2009<span class=\"_ _1\"></span>, the Group c<span class=\"_ _4\"></span>hanged the defined<span class=\"_ _1a9\"> </span> benefit pension plan into a new defined contribution<span class=\"_ _1a9\"> </span> pension plan. All acquired rights up to J<span class=\"_ _4\"></span>une 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2009<span class=\"_ _25\"></span>, ar<span class=\"_ _4\"></span>e<span class=\"_ _1a9\"> </span> retained<span class=\"_ _1\"></span>. Therefore<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the Group has two pension plans: (i)<span class=\"_ _1a9\"> </span> the initial defined benefit plan and (ii) the pension plan,<span class=\"_ _1\"></span> which is a defined contribution p<span class=\"_ _4\"></span>lan in structure<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The assets of both plans ar<span class=\"_ _4\"></span>e held in separate trustee-ad<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ministered funds<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>According to the Belgian legislation app<span class=\"_ _4\"></span>licable to the<span class=\"_ _1a9\"> </span> second pillar pension plans (the minimum guar<span class=\"_ _4\"></span>anteed<span class=\"_ _1a9\"> </span> return under the so-called \u201cLaw V<span class=\"_ _1\"></span>andenbroucke\u201d)<span class=\"_ _1\"></span>, all<span class=\"_ _1a9\"> </span> Belgian pension plans that ar<span class=\"_ _4\"></span>e structured as defined con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tribution plans ar<span class=\"_ _4\"></span>e considered defined benefit plans under<span class=\"_ _1a9\"> </span> IFRS and therefor<span class=\"_ _4\"></span>e are accounted for as such.<span class=\"_ _1a9\"> </span>Because of this minimum guaranteed r<span class=\"_ _4\"></span>eturn,<span class=\"_ _4\"></span> the emplo<span class=\"_ _4\"></span>yer<span class=\"_ _1a9\"> </span> is exposed to a financial risk since further contributions<span class=\"_ _1a9\"> </span> could be required if the r<span class=\"_ _4\"></span>eturn on the assets is not suffi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cient to reach the minim<span class=\"_ _4\"></span>um benefits to be paid<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s commitments under defined benefit plans,<span class=\"_ _1\"></span> and the related costs,<span class=\"_ _1\"></span> are measured using the \u201cprojected<span class=\"_ _1a9\"> </span> unit credit method<span class=\"_ _1\"></span>\u201d with actuarial valuations being carried<span class=\"_ _1a9\"> </span> out at each balance sheet date b<span class=\"_ _4\"></span>y a qualified actuar<span class=\"_ _3\"></span>y<span class=\"_ _25\"></span>. Past<span class=\"_ _1a9\"> </span> ser<span class=\"_ _3\"></span>vice cost is included immediately to the extent that the<span class=\"_ _1a9\"> </span> benefits are alread<span class=\"_ _4\"></span>y vested<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> and other<span class=\"_ _23\"></span>wise the ser<span class=\"_ _3\"></span>vice is<span class=\"_ _1a9\"> </span> of the revision of original estimates<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> if an<span class=\"_ _4\"></span>y<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> in the statement<span class=\"_ _1a9\"> </span> amortized on a straight-line basis over the aver<span class=\"_ _4\"></span>age period<span class=\"_ _1a9\"> </span> of profit and loss,<span class=\"_ _1\"></span> and a corresponding adjustment to equity<span class=\"_ _1a9\"> </span> until the benefits become vested<span class=\"_ _4\"></span>. Remeasurements of the<span class=\"_ _1a9\"> </span> over the r<span class=\"_ _4\"></span>emaining vesting period<span class=\"_ _4\"></span>. The pr<span class=\"_ _4\"></span>oceeds received<span class=\"_ _1\"></span>, net<span class=\"_ _1a9\"> </span> net defined obligation are r<span class=\"_ _4\"></span>ecognized directly within equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>of any dir<span class=\"_ _4\"></span>ectly attributable tr<span class=\"_ _4\"></span>ansaction costs,<span class=\"_ _1\"></span> are credited to<span class=\"_ _1a9\"> </span> share capital (nominal value) and share pr<span class=\"_ _4\"></span>emium when the<span class=\"_ _1a9\"> </span> The retir<span class=\"_ _4\"></span>ement benefit obligation recognized in the<span class=\"_ _1a9\"> </span> subscription rights are exercised<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>statement of financial position represents the f<span class=\"_ _4\"></span>air value of<span class=\"_ _1a9\"> </span> plan assets at the reporting date,<span class=\"_ _1\"></span> less plan liabilities calcu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>(N) <span class=\"_ _56\"> </span><span class=\"ws0\">FINANCIAL INS<span class=\"_ _4\"></span>TRUMENTS<span class=\"_ _1a9\"> </span></span>lated using the projected unit credit method discounted<span class=\"_ _1a9\"> </span> to its present value using yields availab<span class=\"_ _4\"></span>le on high quality<span class=\"_ _1a9\"> </span> F<span class=\"_ _4\"></span>inancial assets<span class=\"_ _1a9\"> </span>corporate bonds that have maturity dates appr<span class=\"_ _4\"></span>oximating<span class=\"_ _1a9\"> </span> to the terms of the liabilities and are denominated in the<span class=\"_ _1a9\"> </span> IN<span class=\"_ _3\"></span>ITIAL R<span class=\"_ _3\"></span>ECOGNI<span class=\"_ _3\"></span>TIO<span class=\"_ _3\"></span>N AND M<span class=\"_ _3\"></span>E<span class=\"_ _3\"></span>ASU<span class=\"_ _3\"></span>REM<span class=\"_ _3\"></span>ENT<span class=\"_ _1a9\"> </span>same currency as the post-emp<span class=\"_ _4\"></span>loyment benefit obliga<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>F<span class=\"_ _4\"></span>inancial assets are classifi<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> at initial recognition,<span class=\"_ _4\"></span> and subse<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tions less the effect of minimum funding requir<span class=\"_ _4\"></span>ements<span class=\"_ _1a9\"> </span> quently measured<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> at either amortized cost, fair value thr<span class=\"_ _4\"></span>ough<span class=\"_ _1a9\"> </span> agreed with scheme tr<span class=\"_ _4\"></span>ustees.<span class=\"_ _1a9\"> </span>other comprehensive income (<span class=\"ff3 ws5b\">\u201cOCI<span class=\"_ _4\"></span>\u201d<span class=\"ff1 ws136\">) or fair value through<span class=\"_ _1a9\"> </span></span></span><span class=\"ff3 ws5b\"><span class=\"ff1 ws136\"> </span></span>profit or loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> No other long- or short-term benefits are granted to<span class=\"_ _1a9\"> </span> emplo<span class=\"_ _4\"></span>yees<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The classification of financial assets at initial r<span class=\"_ _4\"></span>ecognition<span class=\"_ _1a9\"> </span> depends on the financial asset\u2019<span class=\"_ _1\"></span>s contractual cash flow c<span class=\"_ _4\"></span>har<span class=\"_ _1\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>Share-based compensation<span class=\"_ _1a9\"> </span>acteristics and the Company\u2019<span class=\"_ _1\"></span>s business model for manag<span class=\"_ _4\"></span>ing<span class=\"_ _1a9\"> </span> them. With the exception of trade r<span class=\"_ _4\"></span>eceivables that do not<span class=\"_ _1a9\"> </span> The Group oper<span class=\"_ _4\"></span>ates equity-settled<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> share-based compensa<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>contain a significant financing component,<span class=\"_ _4\"></span> the Compan<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span> tion plans through whic<span class=\"_ _4\"></span>h it grants share subscription rights<span class=\"_ _1a9\"> </span> initially measures a financial asset at its fair value <span class=\"_ _4\"></span>plus,<span class=\"_ _1\"></span> in the<span class=\"_ _3\"></span> (giving the holder the right to subscribe to a specific number<span class=\"_ _1a9\"> </span> case of a financial asset not at fair value through profit or loss<span class=\"_ _4\"></span>,<span class=\"_ _1a9\"> </span> of shares in accordance with the shar<span class=\"_ _4\"></span>e option plan,<span class=\"_ _1\"></span> hereafter<span class=\"_ _3\"></span> transaction costs<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> referr<span class=\"_ _4\"></span>ed to as \u2018subscription rights<span class=\"_ _4\"></span>\u2019) to the CEO<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> personnel,<span class=\"_ _1a9\"> </span> and consultants as consideration in exchange f<span class=\"_ _4\"></span>or ser<span class=\"_ _3\"></span>vices<span class=\"_ _3\"></span> T<span class=\"_ _25\"></span>rade receivables that do not contain a significant financing<span class=\"_ _1a9\"> </span> performed<span class=\"_ _4\"></span>. The fair value of the services received in exchange<span class=\"_ _1a9\"> </span> component are measured initiall<span class=\"_ _4\"></span>y at the transaction price de<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>for the granting of the subscription rights is r<span class=\"_ _4\"></span>ecognized as<span class=\"_ _1a9\"> </span> termined under IFRS 15<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>an expense over the vesting period with a corr<span class=\"_ _4\"></span>esponding<span class=\"_ _1a9\"> </span> increase in equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span> In order for a financial asset to be classifi<span class=\"_ _4\"></span>ed and measured<span class=\"_ _1a9\"> </span> at amortized cost or fair value through OCI<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> it needs to give<span class=\"_ _1a9\"> </span> The total amount to be expensed o<span class=\"_ _4\"></span>ver the vesting period<span class=\"_ _1a9\"> </span> rise to cash flows that ar<span class=\"_ _4\"></span>e \u2018solely payments of principal and<span class=\"_ _1a9\"> </span> is determined by r<span class=\"_ _4\"></span>eference to the fair value at the date on<span class=\"_ _1a9\"> </span> interest\u2019 (<span class=\"ff3 ws5b\">\u201cSPPI<span class=\"_ _4\"></span>\u201d<span class=\"ff1 ws50\">) on the principal amount outstanding. This<span class=\"_ _1a9\"> </span></span></span><span class=\"ff3 ws5b\"><span class=\"ff1 ws50\"> </span></span>which the subscription rights are gr<span class=\"_ _4\"></span>anted<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> measured using<span class=\"_ _3\"></span> assessment is referr<span class=\"_ _4\"></span>ed to as the SPPI test and is performed<span class=\"_ _3\"></span> the Black &amp; Scho<span class=\"_ _4\"></span>les model,<span class=\"_ _4\"></span> taking into account the term and<span class=\"_ _1a9\"> </span> at an instrument level.<span class=\"_ _1a9\"> </span> conditions upon which the subscription rights w<span class=\"_ _4\"></span>ere granted<span class=\"_ _1a9\"> </span> excluding the impact of an<span class=\"_ _4\"></span>y non-market vesting conditions. A<span class=\"_ _4\"></span>t<span class=\"_ _1a9\"> </span> The Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s business model for managing financial<span class=\"_ _1a9\"> </span> each balance sheet date<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the entity r<span class=\"_ _4\"></span>evises its estimates of the<span class=\"_ _1a9\"> </span> assets refers to ho<span class=\"_ _4\"></span>w it manages its financial assets in order<span class=\"_ _1a9\"> </span> number of subscription rights that are expected to become<span class=\"_ _1a9\"> </span> to generate cash flo<span class=\"_ _4\"></span>ws<span class=\"_ _4\"></span>. The business model determines<span class=\"_ _1a9\"> </span> exercisable except wher<span class=\"_ _4\"></span>e forfeiture is only due to shares not<span class=\"_ _1a9\"> </span> whether cash flows will r<span class=\"_ _4\"></span>esult from collecting contractual cash<span class=\"_ _1a9\"> </span> achieving the thresho<span class=\"_ _4\"></span>ld for vesting. It recognizes the impact<span class=\"_ _1a9\"> </span> flows<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> selling the financial assets<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> or both<span class=\"_ _1a9\"> </span>85<span class=\"_ _1a9\"> </span>OXURION<span class=\"ff7 ws0\"> ANNU<span class=\"_ _4\"></span>AL REPORT 2022<span class=\"_ _1a9\"> </span></span>SUBS<span class=\"_ _3\"></span>EQUENT ME<span class=\"_ _3\"></span>ASU<span class=\"_ _3\"></span>REMENT<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>or purposes of subsequent measurement,<span class=\"_ _4\"></span> the fo<span class=\"_ _4\"></span>llowing cat<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>egories of financial assets are r<span class=\"_ _4\"></span>elevant to the Company:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _6c\"> </span><span class=\"ws157\">F<span class=\"_ _4\"></span>inancial assets at amortized costs (trade receivables,<span class=\"_ _4\"></span> </span>term deposits); and<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _6c\"> </span><span class=\"ws165\">F<span class=\"_ _4\"></span>inancial assets at fair value through OCI (in<span class=\"_ _4\"></span>vestments in<span class=\"_ _1a9\"> </span></span><span class=\"ws165\"> </span>debt instruments (bonds))<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>FINA<span class=\"_ _3\"></span>NCIAL A<span class=\"_ _3\"></span>SS<span class=\"_ _3\"></span>ETS A<span class=\"_ _1\"></span>T A<span class=\"_ _3\"></span>MO<span class=\"_ _3\"></span>RTIZED COST<span class=\"_ _1a9\"> </span>This category is the most relevant to the Company<span class=\"_ _25\"></span>. The<span class=\"_ _1a9\"> </span> Company measur<span class=\"_ _4\"></span>es financial assets at amortized cost if both<span class=\"_ _3\"></span> of the follo<span class=\"_ _4\"></span>wing conditions are met:<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _6c\"> </span><span class=\"ws64\">The financial asset is held within a business model with<span class=\"_ _1a9\"> </span></span><span class=\"ws64\"> </span>the objective to hold financial assets in order to collect<span class=\"_ _1a9\"> </span> contractual cash flo<span class=\"_ _4\"></span>ws; and<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _6c\"> </span><span class=\"ws6e\">The contractual terms of the financial asset g<span class=\"_ _4\"></span>ive rise on<span class=\"_ _1a9\"> </span></span><span class=\"ws6e\"> </span>specified dates to cash flo<span class=\"_ _4\"></span>ws that are solely payments of<span class=\"_ _1a9\"> </span> principal and interest on the principal amount outstanding. <span class=\"_ _107\"></span> F<span class=\"_ _4\"></span>inancial assets at amortized cost are subsequently measured<span class=\"_ _1a9\"> </span> using the effective interest r<span class=\"_ _4\"></span>ate (<span class=\"ff3 ws5b\">\u201cEIR\u201d</span>) method and are subject<span class=\"_ _1a9\"> </span> to impairment. Gains and losses are recognized in pr<span class=\"_ _4\"></span>ofit or<span class=\"_ _1a9\"> </span> loss when the asset is derecognized<span class=\"_ _1\"></span>, modifi<span class=\"_ _4\"></span>ed or impaired<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s financial assets at amor<span class=\"_ _3\"></span>tized cost mainly<span class=\"_ _1a9\"> </span> includes trade r<span class=\"_ _4\"></span>eceivables and term deposits<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>FINA<span class=\"_ _3\"></span>NCIAL A<span class=\"_ _3\"></span>SS<span class=\"_ _3\"></span>ETS TH<span class=\"_ _3\"></span>ROU<span class=\"_ _3\"></span>GH OCI (DEBT IN<span class=\"_ _3\"></span>STRU<span class=\"_ _3\"></span>MEN<span class=\"_ _3\"></span>TS<span class=\"_ _4\"></span>)<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y measures debt instruments at fair value<span class=\"_ _1a9\"> </span> through OCI if both of the follo<span class=\"_ _4\"></span>wing conditions are met:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _6c\"> </span><span class=\"ws64\">The financial asset is held within a business model with<span class=\"_ _1a9\"> </span></span><span class=\"ws64\"> </span>the objective of both holding to collect contractual cash<span class=\"_ _1a9\"> </span> flows and selling; and<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _6c\"> </span><span class=\"ws6e\">The contractual terms of the financial asset g<span class=\"_ _4\"></span>ive rise on<span class=\"_ _1a9\"> </span></span><span class=\"ws6e\"> </span>specified dates to cash flo<span class=\"_ _4\"></span>ws that are solely payments of<span class=\"_ _1a9\"> </span> principal and interest on the principal amount outstanding.<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>or debt instruments at fair value through OCI<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> interest<span class=\"_ _1a9\"> </span> income,<span class=\"_ _1\"></span> foreign exchange r<span class=\"_ _4\"></span>evaluation and impairment losses<span class=\"_ _1a9\"> </span> or reversals ar<span class=\"_ _4\"></span>e recognized in the statement of profit or loss<span class=\"_ _1a9\"> </span> and computed in the same manner as for financial assets<span class=\"_ _1a9\"> </span> measured at amortized cost. The remaining fair value c<span class=\"_ _4\"></span>hanges<span class=\"_ _1a9\"> </span> are recognized in OCI<span class=\"_ _1\"></span>. Upon derecognition,<span class=\"_ _4\"></span> the cumulative f<span class=\"_ _4\"></span>air<span class=\"_ _1a9\"> </span> value change recognized in OCI is r<span class=\"_ _4\"></span>ecyc<span class=\"_ _4\"></span>led to profit or loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s debt instruments at fair value through OCI<span class=\"_ _1a9\"> </span> includes investments in quoted debt instr<span class=\"_ _4\"></span>uments (bonds)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>DERE<span class=\"_ _4\"></span>COGNITION<span class=\"_ _1a9\"> </span>A financial asset (or<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> where applicab<span class=\"_ _4\"></span>le<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> a part of a financial<span class=\"_ _3\"></span> asset or part of a group of similar financial assets) is primarily<span class=\"_ _3\"></span> derecognized (i.e<span class=\"_ _4\"></span>.,<span class=\"_ _4\"></span> r<span class=\"_ _4\"></span>emoved from the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s consolidated<span class=\"_ _1a9\"> </span> statement of financial position) when:<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _6c\"> </span><span class=\"wse3\">The rights to receive cash fl<span class=\"_ _4\"></span>ows from the asset ha<span class=\"_ _4\"></span>ve<span class=\"_ _1a9\"> </span></span><span class=\"wse3\"> </span>expired; or<span class=\"_ _1a9\"> </span> \u2022 <span class=\"_ _6c\"> </span><span class=\"ws19e\">The Compan<span class=\"_ _4\"></span>y has transferr<span class=\"_ _4\"></span>ed its rights to receive cash<span class=\"_ _1a9\"> </span></span><span class=\"ws19e\"> </span>flows fr<span class=\"_ _4\"></span>om the asset or has assumed an obligation to<span class=\"_ _1a9\"> </span> pay the received cash flo<span class=\"_ _4\"></span>ws in full without material delay<span class=\"_ _1a9\"> </span> to a third party under a \u2018pass-through\u2019 arrangement and<span class=\"_ _1a9\"> </span> either (a) the Company has tr<span class=\"_ _4\"></span>ansferred substantially all<span class=\"_ _1a9\"> </span> the risks and rew<span class=\"_ _4\"></span>ards of the asset,<span class=\"_ _4\"></span> or (b) the Compan<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span> has neither transferr<span class=\"_ _4\"></span>ed nor retained substantially all the<span class=\"_ _1a9\"> </span> risks and rew<span class=\"_ _4\"></span>ards of the asset but has transf<span class=\"_ _4\"></span>erred contro<span class=\"_ _4\"></span>l<span class=\"_ _1a9\"> </span> of the asset.<span class=\"_ _1a9\"> </span>I<span class=\"_ _1a9\"> </span>MP<span class=\"_ _1\"></span>AIRMENT OF<span class=\"_ _4\"></span> FINA<span class=\"_ _4\"></span>NCIAL<span class=\"_ _4\"></span> ASSET<span class=\"_ _4\"></span>S<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y recognizes an allow<span class=\"_ _4\"></span>ance for expected cr<span class=\"_ _4\"></span>edit<span class=\"_ _1a9\"> </span> losses (<span class=\"ff3 ws5b\">\u201cECLs<span class=\"_ _4\"></span>\u201d<span class=\"ff1 wsd9\">) for all debt instruments not held at fair value<span class=\"_ _1a9\"> </span></span></span><span class=\"ff3 ws5b\"><span class=\"ff1 wsd9\"> </span></span>through profit or loss<span class=\"_ _4\"></span>. ECLs are based on the differ<span class=\"_ _4\"></span>ence<span class=\"_ _1a9\"> </span> between the contr<span class=\"_ _4\"></span>actual cash flows due in accordance with<span class=\"_ _1a9\"> </span> the contract and all the cash flo<span class=\"_ _4\"></span>ws that the Company expects<span class=\"_ _1a9\"> </span> to receive<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> discounted at an appro<span class=\"_ _4\"></span>ximation of the original<span class=\"_ _1a9\"> </span> effective interest r<span class=\"_ _4\"></span>ate. T<span class=\"_ _4\"></span>he expected cash flows will inc<span class=\"_ _4\"></span>lude<span class=\"_ _1a9\"> </span> cash flows fr<span class=\"_ _4\"></span>om the sale of collateral held or other credit en<span class=\"_ _4\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>hancements that are integral to the contr<span class=\"_ _4\"></span>actual terms<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>or trade receivables and term deposits<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the Compan<span class=\"_ _4\"></span>y applies<span class=\"_ _1a9\"> </span>a simplified approac<span class=\"_ _4\"></span>h in calculating ECLs. T<span class=\"_ _4\"></span>herefor<span class=\"_ _4\"></span>e,<span class=\"_ _1\"></span> the<span class=\"_ _3\"></span> Company does not tr<span class=\"_ _4\"></span>ack changes in cr<span class=\"_ _4\"></span>edit risk,<span class=\"_ _4\"></span> but instead<span class=\"_ _1a9\"> </span>recognizes a loss allo<span class=\"_ _4\"></span>wance based on lifetime ECLs at eac<span class=\"_ _4\"></span>h<span class=\"_ _1a9\"> </span>reporting date.<span class=\"_ _1a9\"> </span>Upon impairment,<span class=\"_ _4\"></span> the carrying amount of the financial assets<span class=\"_ _3\"></span> is directly r<span class=\"_ _4\"></span>educed by the impairment loss,<span class=\"_ _1\"></span> with the exception<span class=\"_ _3\"></span> of trade receivab<span class=\"_ _4\"></span>les. F<span class=\"_ _25\"></span>or trade receivables,<span class=\"_ _1\"></span> the carr<span class=\"_ _3\"></span>ying amount<span class=\"_ _3\"></span> is reduced b<span class=\"_ _4\"></span>y means of a separate impairment account. If a<span class=\"_ _1a9\"> </span>trade receivab<span class=\"_ _4\"></span>le is considered uncollectib<span class=\"_ _4\"></span>le,<span class=\"_ _1\"></span> it is written off in<span class=\"_ _3\"></span> the impairment account. Subsequent collection of amounts<span class=\"_ _1a9\"> </span>that had previously been written off is cr<span class=\"_ _4\"></span>edited in the impair<span class=\"_ _1\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>ment account. Modifications in the carr<span class=\"_ _3\"></span>ying amount of the<span class=\"_ _3\"></span> impairment account are recognized in the statement of pr<span class=\"_ _4\"></span>ofit<span class=\"_ _1a9\"> </span>and loss.<span class=\"_ _1a9\"> </span>IN<span class=\"_ _3\"></span>ITIAL R<span class=\"_ _3\"></span>ECOGNI<span class=\"_ _3\"></span>TIO<span class=\"_ _3\"></span>N AND M<span class=\"_ _3\"></span>E<span class=\"_ _3\"></span>ASU<span class=\"_ _3\"></span>REM<span class=\"_ _3\"></span>ENT<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial liabilities are c<span class=\"_ _4\"></span>lassified<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> at initial recognition,<span class=\"_ _4\"></span> at fair<span class=\"_ _1a9\"> </span>value through profit or loss,<span class=\"_ _1\"></span> loans and borrowings<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> payables<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> or as derivatives designated as hedging instruments in an<span class=\"_ _1a9\"> </span>effective hedge<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> as appropriate<span class=\"_ _4\"></span>. All financial liabilities are<span class=\"_ _1a9\"> </span>recognized initially at fair value and<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> in the case of loans<span class=\"_ _1a9\"> </span>and borro<span class=\"_ _4\"></span>wings and payables,<span class=\"_ _1\"></span> net of directly attributable<span class=\"_ _1a9\"> </span>transaction costs<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s financial liabilities include trade and other<span class=\"_ _1a9\"> </span>payables and convertible loans<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>SUBS<span class=\"_ _3\"></span>EQUENT ME<span class=\"_ _3\"></span>ASU<span class=\"_ _3\"></span>REMENT<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>or purposes of subsequent measurement,<span class=\"_ _1\"></span> financial liabili<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ties are classifi<span class=\"_ _4\"></span>ed in two categories:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Financial liabilities at fair value through pr<span class=\"_ _4\"></span>ofit or loss<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws1de\">Financial liabilities at amortized cost (loans and<span class=\"_ _1a9\"> </span></span>borro<span class=\"_ _4\"></span>wings)<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial liabilities at fair value through profit and loss<span class=\"_ _1a9\"> </span>include financial liabilities designated upon initial recogni<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion as at fair value through profit or loss and only if the<span class=\"_ _1a9\"> </span>criteria in IFRS 9 are satisfied<span class=\"_ _1\"></span>. The Group has designated<span class=\"_ _1a9\"> </span>convertible loans at fair value through profit and loss<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> since<span class=\"_ _1a9\"> </span>the convertible loans contain embedded derivatives for<span class=\"_ _1a9\"> </span>which assessment of whether it is requir<span class=\"_ _4\"></span>ed to separate the<span class=\"_ _1a9\"> </span>embedded derivative from the host contr<span class=\"_ _4\"></span>act to measure<span class=\"_ _1a9\"> </span>the derivative at fair value<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> w<span class=\"_ _4\"></span>ould be more complex or<span class=\"_ _1a9\"> </span>result in less reliab<span class=\"_ _4\"></span>le measures than measuring the entir<span class=\"_ _4\"></span>e<span class=\"_ _1a9\"> </span>instrument at fair value through profit or loss As suc<span class=\"_ _4\"></span>h the<span class=\"_ _1a9\"> </span>conditions in IFRS 9 4<span class=\"_ _4\"></span>.3<span class=\"_ _1\"></span>.5 are met and designation at fair<span class=\"_ _1a9\"> </span>value through profit or loss is permitted<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The convertible loans are measur<span class=\"_ _4\"></span>ed at fair value through<span class=\"_ _1a9\"> </span>profit or loss,<span class=\"_ _1\"></span> using the valuation methods described in<span class=\"_ _1a9\"> </span>note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.11<span class=\"_ _4\"></span>. T<span class=\"_ _25\"></span>ransaction costs in relation to these financial<span class=\"_ _1a9\"> </span>liabilities at fair value through profit or loss ar<span class=\"_ _4\"></span>e expensed as<span class=\"_ _1a9\"> </span>incurred and inc<span class=\"_ _4\"></span>luded in the line item \u2018F<span class=\"_ _4\"></span>inance expense\u2019 in<span class=\"_ _1a9\"> </span>the consolidated statement of profit and los<span class=\"_ _1a9\"> </span>s<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial liabilities<span class=\"_ _1a9\"> </span>DISTIN<span class=\"_ _3\"></span>CTION BE<span class=\"_ _3\"></span>TWEEN FINAN<span class=\"_ _3\"></span>CIAL LIABILITIES<span class=\"_ _1a9\"> </span>AN<span class=\"_ _3\"></span>D<span class=\"_ _3\"></span> EQ<span class=\"_ _3\"></span>U<span class=\"_ _3\"></span>IT<span class=\"_ _23\"></span>Y<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial liabilities and equity instruments issued by the Gr<span class=\"_ _4\"></span>oup<span class=\"_ _1a9\"> </span>are classifi<span class=\"_ _4\"></span>ed according to the substance of the contractual<span class=\"_ _1a9\"> </span>arrangements enter<span class=\"_ _4\"></span>ed into and the definitions of a financial<span class=\"_ _1a9\"> </span>liability and an equity instrument. An equity instrument is an<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span>contract that evidences a residual inter<span class=\"_ _4\"></span>est in the assets of the<span class=\"_ _1a9\"> </span>Group after deducting all its liabilities<span class=\"_ _4\"></span>. The accounting policies<span class=\"_ _1a9\"> </span>adopted for specific financial liabilities and equity instruments<span class=\"_ _1a9\"> </span>are set out belo<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>T<span class=\"_ _25\"></span>rade and other payables are subsequently measured at amortized cost, using the eff<span class=\"_ _4\"></span>ective interest rate metho<span class=\"_ _1a9\"> </span>(P) <span class=\"_ _56\"> </span>FINANCIAL INCOME AND EXPENSES<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial income includes interest income on in<span class=\"_ _4\"></span>vested funds. Realized and unr<span class=\"_ _4\"></span>ealized exchange differ<span class=\"_ _4\"></span>ences are reported under financial income and expenses.<span class=\"_ _1a9\"> </span>R) <span class=\"_ _56\"> </span>INVENTORIES<span class=\"_ _1a9\"> </span>Raw and ancillar<span class=\"_ _3\"></span>y materials and commodities are stated at the low<span class=\"_ _4\"></span>er of cost or net realizable value<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he inventor<span class=\"_ _3\"></span>y costing system is based on the FIFO-method<span class=\"_ _1\"></span>. Goods in process and finished goods are stated <span class=\"_ _4\"></span>at the standard manufacturing cost or net r<span class=\"_ _4\"></span>ealizable value<span class=\"_ _4\"></span>. The inventor<span class=\"_ _3\"></span>y costing system is based on the FIFO-method<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The net realizab<span class=\"_ _4\"></span>le value test is performed for each reporting period<span class=\"_ _4\"></span>. Net realizab<span class=\"_ _4\"></span>le value is the estimated selling price in the ordinar<span class=\"_ _3\"></span>y course of business less the estimated costs of completion and the estimated costs necessar<span class=\"_ _3\"></span>y to make the sale.<span class=\"_ _1a9\"> </span>The standard manuf<span class=\"_ _4\"></span>acturing price of the goods in process and of the finished goods,<span class=\"_ _1\"></span> includes (i) the acquisition value of the raw materials<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> (ii) consumab<span class=\"_ _4\"></span>les and ancillar<span class=\"_ _3\"></span>y materials,<span class=\"_ _1\"></span> (iii) the production costs that are directly attrib<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>utable to the product,<span class=\"_ _1\"></span> and (iv) the propor<span class=\"_ _3\"></span>tioned par<span class=\"_ _3\"></span>t of the production costs that are only indir<span class=\"_ _4\"></span>ectly attributab<span class=\"_ _4\"></span>le to the product,<span class=\"_ _4\"></span> in so far that these costs co<span class=\"_ _4\"></span>ver the normal pro<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>duction period<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The standard manuf<span class=\"_ _4\"></span>acturing price is compared to the actual manufacturing price on an annual basis<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and adjust<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments are made to the value of the inventory<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Impairment losses are calculated on the goods in-process<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> if their manufacturing cost,<span class=\"_ _1\"></span> increased with the estimated amount of the costs to be incurred is higher than the net sales price at year<span class=\"_ _1\"></span>-end<span class=\"_ _1a9\"> </span>Impairment losses on inventories are anal<span class=\"_ _4\"></span>yzed on a case-<span class=\"_ _1a9\"> </span>by-case basis if the net r<span class=\"_ _4\"></span>ealizable value is low<span class=\"_ _4\"></span>er than the<span class=\"_ _1a9\"> </span>cost. The calculation of the net realizab<span class=\"_ _4\"></span>le value takes into<span class=\"_ _1a9\"> </span>account the specific characteristics of the in<span class=\"_ _4\"></span>ventories,<span class=\"_ _1\"></span> including the due date and if there ar<span class=\"_ _4\"></span>e indications of a low<span class=\"_ _1a9\"> </span>rotation.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForExpensesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-36": {
   "value": "(H) <span class=\"_ _35\"> </span>INT<span class=\"_ _25\"></span>ANGIBLE ASSETS<span class=\"_ _1a9\"> </span>Internally generated intangib<span class=\"_ _4\"></span>le assets<span class=\"_ _1a9\"> </span>Research costs ar<span class=\"_ _4\"></span>e charged to statement of profit and loss<span class=\"_ _1a9\"> </span>as incurred<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>An internally generated intangib<span class=\"_ _4\"></span>le fixed asset (see note<span class=\"_ _1a9\"> </span>5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.3) which arises from development activities undertak<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>en in the Group is recognized only if all <span class=\"_ _4\"></span>of the following<span class=\"_ _1a9\"> </span>conditions are met:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws241\">T<span class=\"_ _1\"></span>echnical possibility of making the intangible asset<span class=\"_ _1a9\"> </span></span>ready for use<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"wscf\">The intention is to complete the intangible asset and<span class=\"_ _1a9\"> </span></span>use or sell it.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Possibility of using or selling the intangible asset.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws24\">It is probable that the intangible asset will generate<span class=\"_ _1a9\"> </span></span>future economic benefit or demonstrate the existence<span class=\"_ _1a9\"> </span>of a market.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws242\">Availability of adequate tec<span class=\"_ _4\"></span>hnical and financial<span class=\"_ _1a9\"> </span></span>resources to comp<span class=\"_ _4\"></span>lete the development; and<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws199\">Availability to r<span class=\"_ _4\"></span>eliably measur<span class=\"_ _4\"></span>e the attributed expenses<span class=\"_ _1a9\"> </span></span>for the intangible asset during development.<span class=\"_ _1a9\"> </span>The patent costs for protecting the intang<span class=\"_ _4\"></span>ible assets are<span class=\"_ _1a9\"> </span>recognized as an expense<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws243 gsa0\">The related milestone payments can onl<span class=\"_ _4\"></span>y be capi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1d0 gsa1\">talized if they meet the criteria for recognition of an <span class=\"_ _33\"></span><span class=\"ws0\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws151 gsa2\">internally generated intangib<span class=\"_ _4\"></span>le asset and is recognized at<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsa3\">the moment the milestone is achieved<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws10d gsa4\">Royalties paid/payab<span class=\"_ _4\"></span>le for acquired intellectual property<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws8a gsa5\">are accrued for in line with the <span class=\"_ _4\"></span>underlying sales and recog<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsa6\">nized under the cost of sales<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span> </div>The Group also r<span class=\"_ _4\"></span>eceives tax credits for R&amp;D expenses<span class=\"_ _4\"></span>. These R&amp;D expenses are r<span class=\"_ _4\"></span>ecorded through P&amp;L under IFRS in the line item \u2018Research and development expenses<span class=\"_ _1\"></span>\u2019 as the expenses do not meet the requirements in IAS 38 to be capitalized<span class=\"_ _4\"></span>. The tax cr<span class=\"_ _4\"></span>edit is not subject to unfulfilled conditions. In case ther<span class=\"_ _4\"></span>e is insufficient tax against which to set off the tax credit,<span class=\"_ _1\"></span> the credit can be carried for<span class=\"_ _3\"></span>ward during 5 consecutive assessment years<span class=\"_ _4\"></span>. The tax cr<span class=\"_ _4\"></span>edit re<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ceivable is presented f<span class=\"_ _4\"></span>or the non-current portion in the line item \u2018Non-current tax cr<span class=\"_ _4\"></span>edit\u2019 and for the current portion in the line item \u2018Current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _4\"></span>\u2019 of the consolidated statement of financial position. At the end of 5 consecu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tive assessment years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the balance of the unused tax cr<span class=\"_ _4\"></span>edit is received in cash from the go<span class=\"_ _4\"></span>vernment. The income from those tax credits is inc<span class=\"_ _4\"></span>luded in the line item \u2018Other operating income\u2019 in the statement of profit and loss<span class=\"_ _1a9\"> </span>Where the criteria for capitalization of the development<span class=\"_ _1a9\"> </span>expenses are not met,<span class=\"_ _1\"></span> these expenses are recorded as<span class=\"_ _1a9\"> </span>incurred during the period<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>After their initial recording on the statement of financial<span class=\"_ _1a9\"> </span>position intangible assets ar<span class=\"_ _4\"></span>e valued at cost less accumu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lated depreciation and accumulated impairment losses<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Amortization of capitalized development costs are recog<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>nized in the statement of profit and loss under \u2018Research<span class=\"_ _1a9\"> </span>and Development Expenses<span class=\"_ _4\"></span>\u2019. W<span class=\"_ _4\"></span>e r<span class=\"_ _4\"></span>efer to note 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.3 on<span class=\"_ _1a9\"> </span>\u2018Research and Development Expenses<span class=\"_ _1\"></span>\u2019.<span class=\"_ _1a9\"> </span>The capitalized costs of the patent are amortized over the<span class=\"_ _1a9\"> </span>life of the patent as of the moment that it would gener<span class=\"_ _4\"></span>ate<span class=\"_ _1a9\"> </span>revenue<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Softwar<span class=\"_ _4\"></span>e licenses are amortized over three y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Externally acquired intangib<span class=\"_ _4\"></span>le assets and outsourced<span class=\"_ _1a9\"> </span>R&amp;D costs<span class=\"_ _1a9\"> </span>Payments made to thir<span class=\"_ _4\"></span>d parties for subcontracted R&amp;D<span class=\"_ _25\"></span>,<span class=\"_ _1a9\"> </span>where there is no tr<span class=\"_ _4\"></span>ansfer of intellectual property to<span class=\"_ _1a9\"> </span>Oxurion,<span class=\"_ _4\"></span> are expensed as internal R&amp;D expenses in the<span class=\"_ _1a9\"> </span>period in which they are incur<span class=\"_ _4\"></span>red<span class=\"_ _1\"></span>. Such payments are only<span class=\"_ _1a9\"> </span>capitalized if they meet the criteria for recognition of an<span class=\"_ _1a9\"> </span>internally generated intangib<span class=\"_ _4\"></span>le asset,<span class=\"_ _4\"></span> as indicated abo<span class=\"_ _4\"></span>ve.<span class=\"_ _1a9\"> </span>Oxurion has entered into various contracts f<span class=\"_ _4\"></span>or the ac<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>quisition of licenses to intellectual property or third-par<span class=\"_ _3\"></span>ty<span class=\"_ _1a9\"> </span>know-ho<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> as disc<span class=\"_ _4\"></span>losed further in note 5<span class=\"_ _4\"></span>.8 under the key<span class=\"_ _1a9\"> </span>arrangements section. T<span class=\"_ _4\"></span>hese assets are typically acquired<span class=\"_ _1a9\"> </span>for consideration inc<span class=\"_ _4\"></span>luding upfront,<span class=\"_ _4\"></span> milestone and ro<span class=\"_ _4\"></span>yalty<span class=\"_ _1a9\"> </span>payments.<span class=\"_ _1a9\"> </span>Upfront payments made to third parties to in-license or<span class=\"_ _1a9\"> </span>acquire intellectual property rights,<span class=\"_ _4\"></span> patents<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> compounds,<span class=\"_ _1\"></span> products,<span class=\"_ _1\"></span> and know-how tec<span class=\"_ _4\"></span>hnologies to be used in R&amp;D<span class=\"_ _1a9\"> </span>activities,<span class=\"_ _1\"></span> are capitalized as costs paid for a separately<span class=\"_ _1a9\"> </span>acquired intangib<span class=\"_ _4\"></span>le asset under IAS 38<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForResearchAndDevelopmentExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-59": {
   "value": "(H)  INTANGIBLE ASSETS Internally generated intangible assets Research costs are charged to statement of profit and loss as incurred. An internally generated intangible fixed asset (see note 5.7.3) which arises from development activities undertak- en in the Group is recognized only if all of the following conditions are met: \u2022  Technical possibility of making the intangible asset ready for use. \u2022  The intention is to complete the intangible asset and use or sell it. \u2022  Possibility of using or selling the intangible asset. \u2022  It is probable that the intangible asset will generate future economic benefit or demonstrate the existence of a market. \u2022  Availability of adequate technical and financial resources to complete the development; and \u2022  Availability to reliably measure the attributed expenses for the intangible asset during development. The patent costs for protecting the intangible assets are recognized as an expense. (I)  PROPERTY, PLANT AND EQUIPMENT Property, plant, and equipment are included at the histor- ical cost (material costs only) less accumulated depreci- ation and impairment. Subsequent costs are included in  the carrying amount for the asset or booked as a separate  asset as appropriate, but only when it is probable that  future economic benefits associated with the item will be  generated for the Group and the cost price of the item can  be measured reliably. All other repair and maintenance  costs are charged to the statement of profit and loss as  incurred. The cost of assets retired or otherwise disposed  of, and the related accumulated depreciation, are included  in the statement of profit and loss as part of the gain or  loss on disposal in the year of disposal. Gains and losses  on disposal of property, plant and equipment are included  in other income or expense. Depreciation is calculated using the straight-line method to  allocate the cost of property, plant and equipment to their  estimated residual values over their estimated useful lives  as follows: \u2022  Property, plant and equipment: three to five years \u2022  Furniture and fittings: three to five years The depreciation methods, useful life and residual value  are revalued on each reporting date. We refer to the notes 5.6.3 until 5.6.5 for the disclosures  of where the depreciation charges are recognized in the  statement of profit and loss. Subsequent costs The cost of replacing part of an item of property, plant  and equipment is recognized in the carrying amount of  the item if it is probable that the future economic benefits  embodied within the item replaced will flow to the Group  and its cost can be measured reliably. The carrying amount  of the replaced item is derecognized. The costs of the day- to-day servicing of property, plant and equipment are rec- ognized in profit or loss as incurred J)  LEASED ASSETS The right-of-use asset is depreciated over the shorter of  these asset\u2019s useful life and the lease term on a straight- line basis Where the criteria for capitalization of the development expenses are not met, these expenses are recorded as incurred during the period. After their initial recording on the statement of financial position intangible assets are valued at cost less accumu- lated depreciation and accumulated impairment losses. Amortization of capitalized development costs are recog- nized in the statement of profit and loss under \u2018Research and Development Expenses\u2019. We refer to note 5.6.3 on \u2018Research and Development Expenses\u2019. The capitalized costs of the patent are amortized over the life of the patent as of the moment that it would generate revenue. Software licenses are amortized over three years. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDepreciationExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-98": {
   "value": "(I)  PROPERTY, PLANT AND EQUIPMENT Property, plant, and equipment are included at the histor- ical cost (material costs only) less accumulated depreci- ation and impairment. Subsequent costs are included in  the carrying amount for the asset or booked as a separate  asset as appropriate, but only when it is probable that  future economic benefits associated with the item will be  generated for the Group and the cost price of the item can  be measured reliably. All other repair and maintenance  costs are charged to the statement of profit and loss as  incurred. The cost of assets retired or otherwise disposed  of, and the related accumulated depreciation, are included  in the statement of profit and loss as part of the gain or  loss on disposal in the year of disposal. Gains and losses  on disposal of property, plant and equipment are included  in other income or expense. Depreciation is calculated using the straight-line method to  allocate the cost of property, plant and equipment to their  estimated residual values over their estimated useful lives  as follows: \u2022  Property, plant and equipment: three to five years \u2022  Furniture and fittings: three to five years The depreciation methods, useful life and residual value  are revalued on each reporting date. We refer to the notes 5.6.3 until 5.6.5 for the disclosures  of where the depreciation charges are recognized in the  statement of profit and loss. Subsequent costs The cost of replacing part of an item of property, plant  and equipment is recognized in the carrying amount of  the item if it is probable that the future economic benefits  embodied within the item replaced will flow to the Group  and its cost can be measured reliably. The carrying amount  of the replaced item is derecognized. The costs of the day- to-day servicing of property, plant and equipment are rec- ognized in profit or loss as incurred . (K)  IMPAIRMENT LOSSES ON GOODWILL, INTANGIBLE ASSETS AND PROPERTY, PLANT AND EQUIPMENT Intangible assets with an indefinite useful life or not yet available for use and goodwill are not subject to amortiza- tion but are tested annually for impairment or if there is an indication that an asset may be impaired. Assets that are subject to amortization or depreciation are reviewed for impairment whenever events or changes in circumstances indicate that the carrying amount may not be recoverable. An impairment loss is recognized for the amount by which the carrying amount of the asset exceeds its recoverable amount. The recoverable amount is the higher of an asset\u2019s fair value less the costs to sell the asset and its value in use. These values are generally determined based on discount- ed cash flow calculations. For the purpose of assessing im- pairment, assets are grouped at the lowest levels for which there are separately identifiable cash flows (cash-generat- ing units). The impairment loss is allocated first to reduce the carrying amount of any goodwill allocated to the cash-generating unit pro rata to the carrying amount of each asset in the unit. An impairment loss recognized for goodwill cannot be reversed in a subsequent period. For assets other than goodwill, where an impairment loss is subsequently reversed, the carrying amount of the asset (cash-generating unit) is increased to the revised estimate of its recoverable value, but in such a way that the increased carrying amount does not exceed the carrying amount that would have been determined had no impairment loss been included for the asset (cash-generating unit) in prior years. The reversal of an impairment loss is included im- mediately in the statement of profit and loss. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForPropertyPlantAndEquipmentExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-133": {
   "value": "(I) <span class=\"_ _38\"> </span>PROPERTY<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> PLANT AND EQUIPMENT<span class=\"_ _1a9\"> </span>Property<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> p<span class=\"_ _4\"></span>lant,<span class=\"_ _4\"></span> and equipment are inc<span class=\"_ _4\"></span>luded at the histor<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ical cost (material costs only) less accumulated depreci<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ation and impairment. Subsequent costs are included in<span class=\"_ _1a9\"> </span> the carr<span class=\"_ _3\"></span>ying amount for the asset or booked as a separate<span class=\"_ _1a9\"> </span> asset as appropriate<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> but onl<span class=\"_ _4\"></span>y when it is probable that<span class=\"_ _1a9\"> </span> future economic benefits associated with the item will be<span class=\"_ _1a9\"> </span> generated for the Group and the cost price of the item can<span class=\"_ _1a9\"> </span> be measured reliab<span class=\"_ _4\"></span>ly<span class=\"_ _25\"></span>. All other repair and maintenance<span class=\"_ _1a9\"> </span> costs are char<span class=\"_ _4\"></span>ged to the statement of profit and loss as<span class=\"_ _1a9\"> </span> incurred<span class=\"_ _1\"></span>. The cost of assets retired or otherwise disposed<span class=\"_ _1a9\"> </span> of<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> and the related accumulated depr<span class=\"_ _4\"></span>eciation,<span class=\"_ _4\"></span> are inc<span class=\"_ _4\"></span>luded<span class=\"_ _1a9\"> </span> in the statement of profit and loss as part of the gain or<span class=\"_ _1a9\"> </span> loss on disposal in the year of disposal. Gains and losses<span class=\"_ _1a9\"> </span> on disposal of property<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> p<span class=\"_ _4\"></span>lant and equipment are included<span class=\"_ _1a9\"> </span> in other income or expense.<span class=\"_ _1a9\"> </span>Depreciation is calculated using the straight-line method to<span class=\"_ _1a9\"> </span> allocate the cost of property<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> p<span class=\"_ _4\"></span>lant and equipment to their<span class=\"_ _1a9\"> </span> estimated residual values o<span class=\"_ _4\"></span>ver their estimated useful lives<span class=\"_ _1a9\"> </span> as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Proper<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>, p<span class=\"_ _4\"></span>lant and equipment: three to five y<span class=\"_ _4\"></span>ears<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>F<span class=\"_ _4\"></span>urniture and fittings: thr<span class=\"_ _4\"></span>ee to five years<span class=\"_ _1a9\"> </span>The depreciation methods<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> useful life and r<span class=\"_ _4\"></span>esidual value<span class=\"_ _1a9\"> </span> are revalued on eac<span class=\"_ _4\"></span>h reporting date.<span class=\"_ _1a9\"> </span>W<span class=\"_ _4\"></span>e refer to the notes 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.3 until 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.5 for the disclosures<span class=\"_ _1a9\"> </span> of where the depreciation c<span class=\"_ _4\"></span>harges are r<span class=\"_ _4\"></span>ecognized in the<span class=\"_ _1a9\"> </span> statement of profit and loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Pension benefits<span class=\"_ _1a9\"> </span>Starting July 1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2009<span class=\"_ _1\"></span>, the Group c<span class=\"_ _4\"></span>hanged the defined<span class=\"_ _1a9\"> </span> benefit pension plan into a new defined contribution<span class=\"_ _1a9\"> </span> pension plan. All acquired rights up to J<span class=\"_ _4\"></span>une 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2009<span class=\"_ _25\"></span>, ar<span class=\"_ _4\"></span>e<span class=\"_ _1a9\"> </span> retained<span class=\"_ _1\"></span>. Therefore<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the Group has two pension plans: (i)<span class=\"_ _1a9\"> </span> the initial defined benefit plan and (ii) the pension plan,<span class=\"_ _1\"></span> which is a defined contribution p<span class=\"_ _4\"></span>lan in structure<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The assets of both plans ar<span class=\"_ _4\"></span>e held in separate trustee-ad<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ministered funds<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>According to the Belgian legislation app<span class=\"_ _4\"></span>licable to the<span class=\"_ _1a9\"> </span> second pillar pension plans (the minimum guar<span class=\"_ _4\"></span>anteed<span class=\"_ _1a9\"> </span> return under the so-called \u201cLaw V<span class=\"_ _1\"></span>andenbroucke\u201d)<span class=\"_ _1\"></span>, all<span class=\"_ _1a9\"> </span> Belgian pension plans that ar<span class=\"_ _4\"></span>e structured as defined con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tribution plans ar<span class=\"_ _4\"></span>e considered defined benefit plans under<span class=\"_ _1a9\"> </span> IFRS and therefor<span class=\"_ _4\"></span>e are accounted for as such.<span class=\"_ _1a9\"> </span>Because of this minimum guaranteed r<span class=\"_ _4\"></span>eturn,<span class=\"_ _4\"></span> the emplo<span class=\"_ _4\"></span>yer<span class=\"_ _1a9\"> </span> is exposed to a financial risk since further contributions<span class=\"_ _1a9\"> </span> could be required if the r<span class=\"_ _4\"></span>eturn on the assets is not suffi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cient to reach the minim<span class=\"_ _4\"></span>um benefits to be paid<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s commitments under defined benefit plans,<span class=\"_ _1\"></span> and the related costs,<span class=\"_ _1\"></span> are measured using the \u201cprojected<span class=\"_ _1a9\"> </span> unit credit method<span class=\"_ _1\"></span>\u201d with actuarial valuations being carried<span class=\"_ _1a9\"> </span> out at each balance sheet date b<span class=\"_ _4\"></span>y a qualified actuar<span class=\"_ _3\"></span>y<span class=\"_ _25\"></span>. Past<span class=\"_ _1a9\"> </span> ser<span class=\"_ _3\"></span>vice cost is included immediately to the extent that the<span class=\"_ _1a9\"> </span> benefits are alread<span class=\"_ _4\"></span>y vested<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> and other<span class=\"_ _23\"></span>wise the ser<span class=\"_ _3\"></span>vice is<span class=\"_ _1a9\"> </span>amortized on a straight-line basis over the aver<span class=\"_ _4\"></span>age period<span class=\"_ _1a9\"> </span>until the benefits become vested<span class=\"_ _4\"></span>. Remeasurements of the<span class=\"_ _1a9\"> </span>net defined obligation are r<span class=\"_ _4\"></span>ecognized directly within equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>The retir<span class=\"_ _4\"></span>ement benefit obligation recognized in the<span class=\"_ _1a9\"> </span>statement of financial position represents the f<span class=\"_ _4\"></span>air value of<span class=\"_ _1a9\"> </span>plan assets at the reporting date,<span class=\"_ _1\"></span> less plan liabilities calcu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lated using the projected unit credit method discounted<span class=\"_ _1a9\"> </span>to its present value using yields availab<span class=\"_ _4\"></span>le on high quality<span class=\"_ _1a9\"> </span>corporate bonds that have maturity dates appr<span class=\"_ _4\"></span>oximating<span class=\"_ _1a9\"> </span>to the terms of the liabilities and are denominated in the<span class=\"_ _1a9\"> </span>same currency as the post-emp<span class=\"_ _4\"></span>loyment benefit obliga<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tions less the effect of minimum funding requir<span class=\"_ _4\"></span>ements<span class=\"_ _1a9\"> </span>agreed with scheme tr<span class=\"_ _4\"></span>ustees.<span class=\"_ _1a9\"> </span>No other long- or short-term benefits are granted to<span class=\"_ _1a9\"> </span>emplo<span class=\"_ _4\"></span>yees<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Share-based compensation<span class=\"_ _1a9\"> </span>The Group oper<span class=\"_ _4\"></span>ates equity-settled<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> share-based compensa<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tion plans through whic<span class=\"_ _4\"></span>h it grants share subscription rights<span class=\"_ _1a9\"> </span>(giving the holder the right to subscribe to a specific number<span class=\"_ _1a9\"> </span>of shares in accordance with the shar<span class=\"_ _4\"></span>e option plan,<span class=\"_ _1\"></span> hereafter<span class=\"_ _3\"></span> referr<span class=\"_ _4\"></span>ed to as \u2018subscription rights<span class=\"_ _4\"></span>\u2019) to the CEO<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> personnel,<span class=\"_ _1a9\"> </span>and consultants as consideration in exchange f<span class=\"_ _4\"></span>or ser<span class=\"_ _3\"></span>vices<span class=\"_ _3\"></span> performed<span class=\"_ _4\"></span>. The fair value of the services received in exchange<span class=\"_ _1a9\"> </span>for the granting of the subscription rights is r<span class=\"_ _4\"></span>ecognized as<span class=\"_ _1a9\"> </span>an expense over the vesting period with a corr<span class=\"_ _4\"></span>esponding<span class=\"_ _1a9\"> </span>increase in equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>The total amount to be expensed o<span class=\"_ _4\"></span>ver the vesting period<span class=\"_ _1a9\"> </span>is determined by r<span class=\"_ _4\"></span>eference to the fair value at the date on<span class=\"_ _1a9\"> </span>which the subscription rights are gr<span class=\"_ _4\"></span>anted<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> measured using<span class=\"_ _3\"></span> the Black &amp; Scho<span class=\"_ _4\"></span>les model,<span class=\"_ _4\"></span> taking into account the term and<span class=\"_ _1a9\"> </span>conditions upon which the subscription rights w<span class=\"_ _4\"></span>ere granted<span class=\"_ _1a9\"> </span>excluding the impact of an<span class=\"_ _4\"></span>y non-market vesting conditions. A<span class=\"_ _4\"></span>t<span class=\"_ _1a9\"> </span>each balance sheet date<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the entity r<span class=\"_ _4\"></span>evises its estimates of the<span class=\"_ _1a9\"> </span>number of subscription rights that are expected to become<span class=\"_ _1a9\"> </span>exercisable except wher<span class=\"_ _4\"></span>e forfeiture is only due to shares not<span class=\"_ _1a9\"> </span>achieving the thresho<span class=\"_ _4\"></span>ld for vesting. It recognizes the impact<span class=\"_ _1a9\"> </span>As the net-assets of the Company ar<span class=\"_ _4\"></span>e below 61<span class=\"_ _1\"></span>,500 euro<span class=\"_ _1a9\"> </span>(the statutor<span class=\"_ _3\"></span>y minimum amount of share capital of a<span class=\"_ _1a9\"> </span>Belgian public limited liability compan<span class=\"_ _4\"></span>y)<span class=\"_ _1\"></span>, in accordance with<span class=\"_ _1a9\"> </span>article 7:229 of the BCCA,<span class=\"_ _4\"></span> each inter<span class=\"_ _4\"></span>ested party is entitled<span class=\"_ _1a9\"> </span>to request the competent commercial court to dissolve the<span class=\"_ _1a9\"> </span>Company<span class=\"_ _25\"></span>. In such instance the court may order the disso<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lution of the Company or gr<span class=\"_ _4\"></span>ant a grace period within which<span class=\"_ _1a9\"> </span>the Company is allo<span class=\"_ _4\"></span>wed to r<span class=\"_ _4\"></span>emedy the situation.<span class=\"_ _1a9\"> </span>Based on the above<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the Board of Directors considers it<span class=\"_ _1a9\"> </span>may be reasonable to expect that ther<span class=\"_ _4\"></span>e will be sufficient<span class=\"_ _1a9\"> </span>cash to continue its operations during the next tw<span class=\"_ _4\"></span>elve<span class=\"_ _1a9\"> </span>months,<span class=\"_ _1\"></span> and therefore decided to continue its valuation<span class=\"_ _1a9\"> </span>rules under the assumption of going concern. Ho<span class=\"_ _4\"></span>wever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> there is a material uncertainty relating to going concern<span class=\"_ _1a9\"> </span>of the Group because it is uncertain that the above-men<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tioned committed but conditional funding will be availab<span class=\"_ _4\"></span>le<span class=\"_ _1a9\"> </span>when needed given the conditions related to the funding,<span class=\"_ _4\"></span> and because it is not certain whether the Group will be<span class=\"_ _1a9\"> </span>able to timely obtain the necessary additional funding<span class=\"_ _1a9\"> </span>through debt,<span class=\"_ _4\"></span> equity or non-dilutive funding,<span class=\"_ _1\"></span> par<span class=\"_ _3\"></span>tnering or<span class=\"_ _1a9\"> </span>to realize sufficient cost and investment r<span class=\"_ _4\"></span>eductions.<span class=\"_ _1a9\"> </span>Convertible loans<span class=\"_ _1a9\"> </span>The Group has con<span class=\"_ _4\"></span>vertible loans with Negma and Kreos<span class=\"_ _1a9\"> </span>Capital / Pontif<span class=\"_ _4\"></span>ax V<span class=\"_ _4\"></span>entur<span class=\"_ _4\"></span>es. T<span class=\"_ _4\"></span>he convertible loans are<span class=\"_ _1a9\"> </span>measured at fair value through pr<span class=\"_ _4\"></span>ofit and loss. In deter<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mining the fair value<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the Group makes certain judgments<span class=\"_ _1a9\"> </span>on the valuation model to be applied and the probability<span class=\"_ _1a9\"> </span>that certain scenarios will occur or not in the future. The<span class=\"_ _1a9\"> </span>terms and conditions and further information is provided<span class=\"_ _1a9\"> </span>in note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.11<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Revenue from Contracts with Customer<span class=\"_ _4\"></span>s<span class=\"_ _1a9\"> </span>Under the five-step model established b<span class=\"_ _4\"></span>y the IFRS 15<span class=\"_ _1a9\"> </span>standard<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _4\"></span>s main estimates and assessments relate<span class=\"_ _1a9\"> </span>to identifying the performance obligations under its contracts<span class=\"_ _1a9\"> </span>and allocating the transaction price according to the stand-<span class=\"_ _1a9\"> </span>alone price of each of the performance obligations<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.5.4 <span class=\"_ _5b\"> </span><span class=\"ls11 ws27\">Main accounting est<span class=\"_ _4\"></span>imat<span class=\"_ _4\"></span>es,<span class=\"_ _1a9\"> </span></span>assumpt<span class=\"_ _4\"></span>ions and judgments<span class=\"_ _1a9\"> </span>Reporting the financial statements in accordance with IFRS<span class=\"_ _3\"></span> requires management to r<span class=\"_ _4\"></span>ely on estimates,<span class=\"_ _1\"></span> assumptions and<span class=\"_ _3\"></span> judgments that impact the amounts reported under assets<span class=\"_ _3\"></span> and liabilities,<span class=\"_ _1\"></span> the notes on the latent assets and liabilities on the<span class=\"_ _3\"></span> date of the financial statements,<span class=\"_ _1\"></span> and the repor<span class=\"_ _3\"></span>ted amounts of<span class=\"_ _3\"></span> income and expenditure in the course of the r<span class=\"_ _4\"></span>eporting period.<span class=\"_ _1a9\"> </span>The actual results may diff<span class=\"_ _4\"></span>er from these estimates.<span class=\"_ _1a9\"> </span>The main assumptions relating to futur<span class=\"_ _4\"></span>e developments and<span class=\"_ _1a9\"> </span>the main sources of uncertainty regarding estimates on the<span class=\"_ _1a9\"> </span>reporting date are set out below:<span class=\"_ _1a9\"> </span>Going Concern - material uncertainty<span class=\"_ _1a9\"> </span>The consolidated financial statements w<span class=\"_ _4\"></span>ere prepar<span class=\"_ _4\"></span>ed on a<span class=\"_ _1a9\"> </span>going concern basis<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s cash balance at December 31<span class=\"_ _1\"></span>, 2022,<span class=\"_ _1\"></span> of 3<span class=\"_ _4\"></span>.6<span class=\"_ _1a9\"> </span>million euro is not sufficient to fund the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s operations<span class=\"_ _1a9\"> </span>during the next twelve months<span class=\"_ _4\"></span>. How<span class=\"_ _4\"></span>ever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> post-closing,<span class=\"_ _1\"></span> the<span class=\"_ _1a9\"> </span>Group entered into the A<span class=\"_ _4\"></span>tlas Subscription Agreement.<span class=\"ws0\"> </span>This committed but conditional funding w<span class=\"_ _4\"></span>ould be sufficient<span class=\"_ _1a9\"> </span>to fund operations during the next tw<span class=\"_ _4\"></span>elve months from the<span class=\"_ _1a9\"> </span>financial statement\u2019<span class=\"_ _1\"></span>s issue date. Ho<span class=\"_ _4\"></span>wever<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> given the contin<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>gent nature of this funding,<span class=\"_ _4\"></span> the Group is actively exp<span class=\"_ _4\"></span>loring<span class=\"_ _1a9\"> </span>the possibility of obtaining additional funding through debt,<span class=\"_ _1\"></span> equity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> or non-dilutive funding,<span class=\"_ _4\"></span> including the licensing of<span class=\"_ _1a9\"> </span>THR-149<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> or alternatively r<span class=\"_ _4\"></span>educing its costs and invest<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments so that there should be sufficient cash to continue<span class=\"_ _1a9\"> </span>its operations during the next tw<span class=\"_ _4\"></span>elve months.<span class=\"_ _1a9\"> </span>The majority of the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s sources of revenue are derived from sales of JETREA\u00ae vials through our w<span class=\"_ _4\"></span>orldwide license agreement with Inceptua and the tripartite agreement with Eumedica. The Group has determined that ther<span class=\"_ _4\"></span>e is only one performance obligation for all contracts in p<span class=\"_ _4\"></span>lace with customers,<span class=\"_ _1\"></span> that is to deliver the JETREA\u00ae product to<span class=\"_ _3\"></span> the customer<span class=\"_ _1\"></span>. Therefor<span class=\"_ _4\"></span>e,<span class=\"_ _1\"></span> the transaction price is equal to the stand-alone selling price of each vial.<span class=\"_ _1a9\"> </span><table class=\"s w1b3 h4c\" id=\"_f01cdb9e-a39a-40c4-85d3-4b63c54fedae\"><tr><td></td><td class=\"t m1 x12d h12 y5bb ff3 fsb fc7 sc0 ls1b wsbe\">STEP<span class=\"_ _108\"> </span><span class=\"ws0\">REVENUE FROM SALE OF VIALS<span class=\"_ _1a9\"> </span></span></td></tr><tr><td></td><td class=\"t m2 x296 h13 y5bc ff1 fsc fc7 sc0 ls0 ws0\">Oxurion has a contract in place </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5bd ff1 fsc fc7 sc0 ls0 ws0\">with Inceptua and Eumedica for </td></tr><tr><td class=\"t m0 x12d h14 y5be ff2 fsd fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>. Identification of the contract<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x296 h13 y5be ff1 fsc fc7 sc0 ls0 ws0\">the commercialization of JETREA\u00ae </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5bf ff1 fsc fc7 sc0 ls0 ws0\">as disclosed in Note 5<span class=\"_ _4\"></span>.8 under Key </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5c0 ff1 fsc fc7 sc0 ls0 ws0\">Agreements.<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m0 x12d h14 y5c1 ff2 fsd fc7 sc0 ls0 ws0\">2. Identification of performance  </td><td class=\"t m2 x296 h13 y5c2 ff1 fsc fc7 sc0 ls0 ws0\">In all distribution contracts,<span class=\"_ _4\"></span> ther<span class=\"_ _4\"></span>e is </td></tr><tr><td class=\"t m0 x12d h14 y5c3 ff2 fsd fc7 sc0 ls0 ws0\">obligations<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x296 h13 y5c4 ff1 fsc fc7 sc0 ls0 ws0\">only one performance obligation: </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5c5 ff1 fsc fc7 sc0 ls0 ws0\">supply of goods to a third party<span class=\"_ _1\"></span>. </td></tr><tr><td class=\"t m0 x12d h14 y5c6 ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>. Identification of the transaction price<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x296 h13 y5c7 ff1 fsc fc7 sc0 ls0 ws0\">Stand-alone price per vial is defined </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5c8 ff1 fsc fc7 sc0 ls0 ws0\">in each agreement with the customer<span class=\"_ _1\"></span>. </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5c9 ff1 fsc fc7 sc0 ls0 ws0\">As there is only one performance </td></tr><tr><td class=\"t m0 x12d h14 y5ca ff2 fsd fc7 sc0 ls0 ws0\">4. Allocation of the tr<span class=\"_ _4\"></span>ansaction price<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x296 h13 y5cb ff1 fsc fc7 sc0 ls0 ws0\">obligation,<span class=\"_ _4\"></span> there is no allocation of the </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5cc ff1 fsc fc7 sc0 ls0 ws0\">price,<span class=\"_ _4\"></span> and therefor<span class=\"_ _4\"></span>e stand-alone price </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5cd ff1 fsc fc7 sc0 ls0 ws0\">per vial is recognized<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td class=\"t m2 x296 h13 y5ce ff1 fsc fc7 sc0 ls0 ws0\">Revenue is recognized upon delivery </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5cf ff1 fsc fc7 sc0 ls0 ws0\">to the customer<span class=\"_ _4\"></span>. Returns are cr<span class=\"_ _4\"></span>edited </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5d0 ff1 fsc fc7 sc0 ls0 ws0\">strictly at discretion of Oxurion,<span class=\"_ _4\"></span> and </td></tr><tr><td class=\"t m0 x12d h14 y5d1 ff2 fsd fc7 sc0 ls0 ws0\">5<span class=\"_ _4\"></span>. Revenue recognition<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x296 h13 y5d2 ff1 fsc fc7 sc0 ls0 ws0\">a provision for US returns is made </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5d3 ff1 fsc fc7 sc0 ls0 ws0\">based on historical data. Rebate </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5d4 ff1 fsc fc7 sc0 ls0 ws0\">provisions for sales made outside the </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5d5 ff1 fsc fc7 sc0 ls0 ws0\">US<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> are made based on contractual </td></tr><tr><td></td><td class=\"t m2 x296 h13 y5d6 ff1 fsc fc7 sc0 ls0 ws0\">agreements and/or local regulations<span class=\"_ _4\"></span>. </td></tr></table>Share-based payment plans<span class=\"_ _1a9\"> </span>The Group defines the cost of shar<span class=\"_ _4\"></span>e-based payment plans on the basis of the fair value of the equity instrument on the grant date<span class=\"_ _4\"></span>. Determining the fair value involves c<span class=\"_ _4\"></span>hoosing the most suitable valuation model for these equity instru<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments,<span class=\"_ _1\"></span> and the characteristics of the equity instrument and its issue have a decisive impact. It also assumes the input in the valuation model of a number of relevant assump<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tions,<span class=\"_ _1\"></span> such as the estimated useful life of the right,<span class=\"_ _4\"></span> volatility<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> etc. T<span class=\"_ _4\"></span>he assessments and the model are specified in mor<span class=\"_ _4\"></span>e detail in note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.8<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Capitalization and impairment of intangible assets The Group accounts for as intang<span class=\"_ _4\"></span>ible assets only rights and intellectual property if acquired from third parties and costs of internal development only if the conditions for the recognition of intangib<span class=\"_ _4\"></span>le assets are met,<span class=\"_ _1\"></span> other<span class=\"_ _23\"></span>wise such costs are included in the statement of pr<span class=\"_ _4\"></span>ofit and loss when they arise. T<span class=\"_ _4\"></span>he costs are capitalized only if the product is in Phase 3 and the chances of future success ar<span class=\"_ _4\"></span>e estimated as highly probable<span class=\"_ _4\"></span>. Accounting estimates and assess<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments of future business evo<span class=\"_ _4\"></span>lution,<span class=\"_ _4\"></span> gro<span class=\"_ _4\"></span>wth,<span class=\"_ _4\"></span> sales<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> likelihood of success and discount rate are f<span class=\"_ _4\"></span>actors used in valuing the intangible asset to execute the annual impairment test.<span class=\"_ _1a9\"> </span>T<span class=\"_ _25\"></span>axes<span class=\"_ _1a9\"> </span>The Group considers that ther<span class=\"_ _4\"></span>e is a considerab<span class=\"_ _4\"></span>le uncer<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tainty regarding the futur<span class=\"_ _4\"></span>e use of the tax losses of Oxurion as it is ver<span class=\"_ _3\"></span>y difficult to estimate the impact of the patent deduction on the future tax result at this moment. As the Group can only use the abo<span class=\"_ _4\"></span>vementioned patent deduction on the basis of a tax ruling,<span class=\"_ _4\"></span> the expectation exists that the future tax gains will be rather limited<span class=\"_ _1\"></span>. There is also the un<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>certainty regarding the future use of the tax losses with ThromboGenic<span class=\"_ _1a9\"> </span>s<span class=\"_ _1a9\"> </span>of the revision of original estimates<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> if an<span class=\"_ _4\"></span>y<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> in the statement<span class=\"_ _1a9\"> </span>of profit and loss,<span class=\"_ _1\"></span> and a corresponding adjustment to equity<span class=\"_ _1a9\"> </span>over the r<span class=\"_ _4\"></span>emaining vesting period<span class=\"_ _4\"></span>. The pr<span class=\"_ _4\"></span>oceeds received<span class=\"_ _1\"></span>, net<span class=\"_ _1a9\"> </span>of any dir<span class=\"_ _4\"></span>ectly attributable tr<span class=\"_ _4\"></span>ansaction costs,<span class=\"_ _1\"></span> are credited to<span class=\"_ _1a9\"> </span>share capital (nominal value) and share pr<span class=\"_ _4\"></span>emium when the<span class=\"_ _1a9\"> </span>subscription rights are exercised<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAccountingJudgementsAndEstimatesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-37": {
   "value": "(J)  LEASED ASSETS IFRS 16 The Group leases an office, copiers, and cars. Rental  contracts are typically made for fixed periods of 3 to 4  years but may have extension options as described below.  Lease terms are negotiated on an individual basis and  contain a wide range of different terms and conditions.  The lease agreements do not impose any covenants, but  leased assets may not be used as security for borrowing  purposes. Leases are recognized as right-of-use assets and a cor- responding liability at the date at which the leased asset  is available for use by the Group. Each lease payment  is allocated between the liability and finance cost. The  finance cost is charged to profit or loss over the lease  period so as to produce a constant periodic rate of interest  on the remaining balance of the liability for each period.  The right-of-use asset is depreciated over the shorter of  these asset\u2019s useful life and the lease term on a straight- line basis . Assets and liabilities arising from a lease are initially  measured on a present value basis. Lease liabilities are  exclusively composed of fixed payments less any lease  incentives receivable . The lease payments are discounted using the lessee\u2019s in- cremental borrowing rate, being the rate that the lessee would have to pay to borrow the funds necessary to obtain an asset of similar value in a similar economic environ- ment with similar terms and conditions. Right-of-use assets are measured at cost comprising the amount of the initial measurement of the lease liability and any lease payments made at or before the commence- ment date. Payments associated with short-term leases and leases of low-value assets are recognized on a straight-line basis as an expense in profit or loss. Short-term leases comprise some car leases and are leases with a lease term of twelve months or less. Low-value assets only comprise of one copier. We refer to note 5.7.2 for more information. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForLeasesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-38": {
   "value": "there are separately identifiable cash flows (cash-generat- ing units). The impairment loss is allocated first to reduce the carrying amount of any goodwill allocated to the cash-generating unit pro rata to the carrying amount of each asset in the unit. An impairment loss recognized for goodwill cannot be reversed in a subsequent period. For assets other than goodwill, where an impairment loss is subsequently reversed, the carrying amount of the asset (cash-generating unit) is increased to the revised estimate of its recoverable value, but in such a way that the increased carrying amount does not exceed the carrying amount that would have been determined had no impairment loss been included for the asset (cash-generating unit) in prior years. The reversal of an impairment loss is included im- mediately in the statement of profit and loss. (K)  IMPAIRMENT LOSSES ON GOODWILL, INTANGIBLE ASSETS AND PROPERTY, PLANT AND EQUIPMENT Intangible assets with an indefinite useful life or not yet available for use and goodwill are not subject to amortiza- tion but are tested annually for impairment or if there is an indication that an asset may be impaired. Assets that are subject to amortization or depreciation are reviewed for impairment whenever events or changes in circumstances indicate that the carrying amount may not be recoverable. An impairment loss is recognized for the amount by which the carrying amount of the asset exceeds its recoverable amount. The recoverable amount is the higher of an asset\u2019s fair value less the costs to sell the asset and its value in use. These values are generally determined based on discount- ed cash flow calculations. For the purpose of assessing im- pairment, assets are grouped at the lowest levels for which ( R)  INVENTORIES Impairment losses are calculated on the goods in-process, if their manufacturing cost, increased with the estimated amount of the costs to be incurred is higher than the net sales price at year-end mpairment losses on inventories are analyzed on a case- by-case basis if the net realizable value is lower than the cost. The calculation of the net realizable value takes into account the specific characteristics of the inventories, ncluding the due date and if there are indications of a low rotation. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForImpairmentOfNonfinancialAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-39": {
   "value": "L)  INCOME TAXES Deferred tax is the tax expected to be payable or recov- erable on differences between the carrying amounts of assets and liabilities in the financial statements and the corresponding tax bases used in the computation of taxable profit and is accounted for using the balance sheet method. Deferred tax liabilities are generally recognized for all taxable temporary differences. Deferred tax assets are rec- ognized to the extent that it is probable that taxable profits will be available against which deductible temporary differences can be utilized. Such assets and liabilities are not recognized if the temporary difference arises from goodwill (or negative goodwill) or from the initial recogni- tion (other than in a business combination) of other assets and liabilities in a transaction that affects neither the tax profit nor the accounting profit. Deferred tax liabilities are recognized for taxable temporary differences arising on investments in subsidiaries and as- sociates, and interests in joint ventures, except where the Group is able to control the reversal of the temporary dif- ference and it is probable that the temporary difference will not reverse in the foreseeable future. Deferred tax is calculated at the tax rates that are expected to apply in the period when the liability is settled, or the asset realized. Deferred tax is charged or credited in the statement of profit and loss, except when it relates to items charged or credited directly to equity, in which case the deferred tax is also dealt with in equity. Deferred tax assets and liabilities are offset when they relate to income taxes levied by the same taxation authority and the Group intends to settle its current tax assets and liabilities on a net basis ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDeferredIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-13": {
   "value": "(K) <span class=\"_ _56\"> </span>IMP<span class=\"_ _1\"></span>AIRMENT L<span class=\"_ _1\"></span>OSSES ON GOODWILL,<span class=\"_ _4\"></span> INT<span class=\"_ _25\"></span>ANGIBLE ASSETS AND PROPERTY<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> PLANT AND EQUIPMENT<span class=\"_ _1a9\"> </span>Intangible assets with an indefinite useful life or <span class=\"_ _4\"></span>not yet<span class=\"_ _1a9\"> </span>available f<span class=\"_ _4\"></span>or use and goodwill are not subject to amortiza<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion but are tested ann<span class=\"_ _4\"></span>ually for impairment or if there is an<span class=\"_ _1a9\"> </span>indication that an asset may be impaired<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Assets that are subject to amortization or depreciation are<span class=\"_ _1a9\"> </span>review<span class=\"_ _4\"></span>ed for impairment whenever events or changes in<span class=\"_ _1a9\"> </span>circumstances indicate that the carr<span class=\"_ _3\"></span>ying amount may not<span class=\"_ _1a9\"> </span>be reco<span class=\"_ _4\"></span>verable<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>An impairment loss is recognized for the amount b<span class=\"_ _4\"></span>y which<span class=\"_ _1a9\"> </span>the carr<span class=\"_ _3\"></span>ying amount of the asset exceeds its recover<span class=\"_ _4\"></span>able<span class=\"_ _1a9\"> </span>amount. The reco<span class=\"_ _4\"></span>verab<span class=\"_ _4\"></span>le amount is the higher of an asset\u2019<span class=\"_ _1\"></span>s<span class=\"_ _1a9\"> </span>fair value less the costs to sell the asset and its value in use<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>These values are gener<span class=\"_ _4\"></span>ally determined based on discount<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ed cash flow calculations<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or the purpose of assessing im<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>pairment,<span class=\"_ _4\"></span> assets are gr<span class=\"_ _4\"></span>ouped at the low<span class=\"_ _4\"></span>est levels for which<span class=\"_ _1a9\"> </span>differences can be utilized<span class=\"_ _1\"></span>. Such assets and liabilities are not recognized if the temporary difference arises from goodwill (or negative goodwill) or fr<span class=\"_ _4\"></span>om the initial recogni<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion (other than in a business combination) of other assets and liabilities in a transaction that affects neither the tax profit nor the accounting profit.<span class=\"_ _1a9\"> </span>Deferred tax liabilities ar<span class=\"_ _4\"></span>e recognized for taxab<span class=\"_ _4\"></span>le temporar<span class=\"_ _3\"></span>y differences arising on in<span class=\"_ _4\"></span>vestments in subsidiaries and as<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>sociates,<span class=\"_ _1\"></span> and interests in joint ventures,<span class=\"_ _1\"></span> except where the Group is able to contro<span class=\"_ _4\"></span>l the reversal of the temporary dif<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ference and it is probab<span class=\"_ _4\"></span>le that the temporary difference will not reverse in the for<span class=\"_ _4\"></span>eseeable future<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Deferred tax is calculated at the tax r<span class=\"_ _4\"></span>ates that are expected to apply in the period when the liability is settled<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> or the asset realized<span class=\"_ _1\"></span>. Deferred tax is charged or cr<span class=\"_ _4\"></span>edited in the statement of profit and loss,<span class=\"_ _1\"></span> except when it relates to items charged or cr<span class=\"_ _4\"></span>edited directly to equity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> in whic<span class=\"_ _4\"></span>h case the deferred tax is also dealt with in equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>Deferred tax assets and liabilities ar<span class=\"_ _4\"></span>e offset when they relate to income taxes levied b<span class=\"_ _4\"></span>y the same taxation authority and the Group intends to settle its current tax assets and liabilities on a net basis<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>The Group also r<span class=\"_ _4\"></span>eceives tax credits for R&amp;D expenses<span class=\"_ _4\"></span>. These R&amp;D expenses are r<span class=\"_ _4\"></span>ecorded through P&amp;L under IFRS in the line item \u2018Research and development expenses<span class=\"_ _1\"></span>\u2019 as the expenses do not meet the requirements in IAS 38 to be capitalized<span class=\"_ _4\"></span>. The tax cr<span class=\"_ _4\"></span>edit is not subject to unfulfilled conditions. In case ther<span class=\"_ _4\"></span>e is insufficient tax against which to set off the tax credit,<span class=\"_ _1\"></span> the credit can be carried for<span class=\"_ _3\"></span>ward during 5 consecutive assessment years<span class=\"_ _4\"></span>. The tax cr<span class=\"_ _4\"></span>edit re<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ceivable is presented f<span class=\"_ _4\"></span>or the non-current portion in the line item \u2018Non-current tax cr<span class=\"_ _4\"></span>edit\u2019 and for the current portion in the line item \u2018Current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _4\"></span>\u2019 of the consolidated statement of financial position. At the end of 5 consecu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tive assessment years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the balance of the unused tax cr<span class=\"_ _4\"></span>edit is received in cash from the go<span class=\"_ _4\"></span>vernment. The income from those tax credits is inc<span class=\"_ _4\"></span>luded in the line item \u2018Other operating income\u2019 in the statement of profit and loss<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>there are separ<span class=\"_ _4\"></span>ately identifiab<span class=\"_ _4\"></span>le cash flows (cash-gener<span class=\"_ _4\"></span>at<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ing units)<span class=\"_ _4\"></span>. The impairment loss is allocated fir<span class=\"_ _4\"></span>st to reduce<span class=\"_ _1a9\"> </span>the carr<span class=\"_ _3\"></span>ying amount of any goodwill allocated to the<span class=\"_ _1a9\"> </span>cash-generating unit pro r<span class=\"_ _4\"></span>ata to the carr<span class=\"_ _3\"></span>ying amount of<span class=\"_ _1a9\"> </span>each asset in the unit. An impairment loss recognized f<span class=\"_ _4\"></span>or<span class=\"_ _1a9\"> </span>goodwill cannot be rever<span class=\"_ _4\"></span>sed in a subsequent period<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or<span class=\"_ _1a9\"> </span>assets other than goodwill,<span class=\"_ _4\"></span> wher<span class=\"_ _4\"></span>e an impairment loss is<span class=\"_ _1a9\"> </span>subsequently reversed<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the carr<span class=\"_ _3\"></span>ying amount of the asset<span class=\"_ _1a9\"> </span>(cash-generating unit) is increased to the r<span class=\"_ _4\"></span>evised estimate<span class=\"_ _1a9\"> </span>of its reco<span class=\"_ _4\"></span>verable value<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> but in such a way that the incr<span class=\"_ _4\"></span>eased<span class=\"_ _1a9\"> </span>carr<span class=\"_ _3\"></span>ying amount does not exceed the carr<span class=\"_ _3\"></span>ying amount<span class=\"_ _1a9\"> </span>that would ha<span class=\"_ _4\"></span>ve been determined had no impairment loss<span class=\"_ _1a9\"> </span>been included for the asset (cash-gener<span class=\"_ _4\"></span>ating unit) in prior<span class=\"_ _1a9\"> </span>years<span class=\"_ _4\"></span>. The r<span class=\"_ _4\"></span>eversal of an impairment loss is included im<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mediately in the statement of profit and loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>(L) <span class=\"_ _72\"> </span>INCOME T<span class=\"_ _25\"></span>AXES<span class=\"_ _1a9\"> </span>Income tax expenses in the statement of profit and loss<span class=\"_ _1a9\"> </span>comprise the tax currently payab<span class=\"_ _4\"></span>le.<span class=\"_ _1a9\"> </span>The tax curr<span class=\"_ _4\"></span>ently payable is based on taxable pr<span class=\"_ _4\"></span>ofit for<span class=\"_ _1a9\"> </span>the year<span class=\"_ _1\"></span>. T<span class=\"_ _25\"></span>axable profit differs from net pr<span class=\"_ _4\"></span>ofit as reported<span class=\"_ _1a9\"> </span>on the statement of profit and loss because it excludes<span class=\"_ _1a9\"> </span>items of income or expense that are taxable or deductib<span class=\"_ _4\"></span>le<span class=\"_ _1a9\"> </span>in other years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and it further excludes items that are never<span class=\"_ _1a9\"> </span>taxable or deductible<span class=\"_ _4\"></span>. The Gr<span class=\"_ _4\"></span>oup<span class=\"_ _1\"></span>\u2019<span class=\"_ _4\"></span>s liability for cur<span class=\"_ _4\"></span>rent tax<span class=\"_ _1a9\"> </span>is calculated using tax rates that have been enacted or<span class=\"_ _1a9\"> </span>substantially enacted on the reporting date.<span class=\"_ _1a9\"> </span>Deferred tax is the tax expected to be payab<span class=\"_ _4\"></span>le or reco<span class=\"_ _4\"></span>v<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>erable on diff<span class=\"_ _4\"></span>erences betw<span class=\"_ _4\"></span>een the carr<span class=\"_ _3\"></span>ying amounts of<span class=\"_ _1a9\"> </span>assets and liabilities in the financial statements and the<span class=\"_ _1a9\"> </span>corresponding tax bases used in the computation of<span class=\"_ _1a9\"> </span>taxable profit and is accounted for using the balance sheet<span class=\"_ _1a9\"> </span>method<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Deferred tax liabilities ar<span class=\"_ _4\"></span>e generally r<span class=\"_ _4\"></span>ecognized for all<span class=\"_ _1a9\"> </span>taxable temporary differences. Def<span class=\"_ _4\"></span>erred tax assets are r<span class=\"_ _4\"></span>ec<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ognized to the extent that it is probable that taxab<span class=\"_ _4\"></span>le profits<span class=\"_ _1a9\"> </span>will be available against whic<span class=\"_ _4\"></span>h deductible temporary<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-83": {
   "value": "K)  IMPAIRMENT LOSSES ON GOODWILL, INTANGIBLE ASSETS AND PROPERTY, PLANT AND EQUIPMENT ntangible assets with an indefinite useful life or not yet available for use and goodwill are not subject to amortiza- ion but are tested annually for impairment or if there is an ndication that an asset may be impaired. Assets that are subject to amortization or depreciation are eviewed for impairment whenever events or changes in circumstances indicate that the carrying amount may not be recoverable. An impairment loss is recognized for the amount by which he carrying amount of the asset exceeds its recoverable amount. The recoverable amount is the higher of an asset\u2019s air value less the costs to sell the asset and its value in use. These values are generally determined based on discount- ed cash flow calculations. For the purpose of assessing im- pairment, assets are grouped at the lowest levels for which there are separately identifiable cash flows (cash-generat- ing units). The impairment loss is allocated first to reduce the carrying amount of any goodwill allocated to the cash-generating unit pro rata to the carrying amount of each asset in the unit. An impairment loss recognized for goodwill cannot be reversed in a subsequent period. For assets other than goodwill, where an impairment loss is subsequently reversed, the carrying amount of the asset (cash-generating unit) is increased to the revised estimate of its recoverable value, but in such a way that the increased carrying amount does not exceed the carrying amount that would have been determined had no impairment loss been included for the asset (cash-generating unit) in prior years. The reversal of an impairment loss is included im- mediately in the statement of profit and loss. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForImpairmentOfAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-110": {
   "value": "The Group also r<span class=\"_ _4\"></span>eceives tax credits for R&amp;D expenses<span class=\"_ _4\"></span>. These R&amp;D expenses are r<span class=\"_ _4\"></span>ecorded through P&amp;L under IFRS in the line item \u2018Research and development expenses<span class=\"_ _1\"></span>\u2019 as the expenses do not meet the requirements in IAS 38 to be capitalized<span class=\"_ _4\"></span>. The tax cr<span class=\"_ _4\"></span>edit is not subject to unfulfilled conditions. In case ther<span class=\"_ _4\"></span>e is insufficient tax against which to set off the tax credit,<span class=\"_ _1\"></span> the credit can be carried for<span class=\"_ _3\"></span>ward during 5 consecutive assessment years<span class=\"_ _4\"></span>. The tax cr<span class=\"_ _4\"></span>edit re<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ceivable is presented f<span class=\"_ _4\"></span>or the non-current portion in the line item \u2018Non-current tax cr<span class=\"_ _4\"></span>edit\u2019 and for the current portion in the line item \u2018Current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _4\"></span>\u2019 of the consolidated statement of financial position. At the end of 5 consecu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tive assessment years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the balance of the unused tax cr<span class=\"_ _4\"></span>edit is received in cash from the go<span class=\"_ _4\"></span>vernment. The income from those tax credits is inc<span class=\"_ _4\"></span>luded in the line item \u2018Other operating income\u2019 in the statement of profit and loss<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForTaxesOtherThanIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-14": {
   "value": "(M) <span class=\"_ _7d\"> </span>EMPL<span class=\"_ _4\"></span>O<span class=\"_ _4\"></span>YEE BENEFIT PLAN<span class=\"_ _1a9\"> </span>Short-term employee benefits<span class=\"_ _1a9\"> </span>Liabilities for wages and salaries that ar<span class=\"_ _4\"></span>e expected to be<span class=\"_ _1a9\"> </span> settled wholly within tw<span class=\"_ _4\"></span>elve months after the end of the<span class=\"_ _1a9\"> </span> period in which the emplo<span class=\"_ _4\"></span>y<span class=\"_ _4\"></span>ees render the related service<span class=\"_ _1a9\"> </span> are recognized in r<span class=\"_ _4\"></span>espect of emplo<span class=\"_ _4\"></span>yees<span class=\"_ _1\"></span>\u2019 ser<span class=\"_ _23\"></span>vices up to<span class=\"_ _1a9\"> </span> the end of the reporting period and are measured at<span class=\"_ _1a9\"> </span> the amounts expected to be paid when the liabilities are<span class=\"_ _1a9\"> </span> settled<span class=\"_ _4\"></span>. The liabilities ar<span class=\"_ _4\"></span>e presented as curr<span class=\"_ _4\"></span>ent emplo<span class=\"_ _4\"></span>yee<span class=\"_ _1a9\"> </span> benefit obligations in the statement of financial position.<span class=\"_ _1a9\"> </span>Pension benefits<span class=\"_ _1a9\"> </span>Starting July 1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2009<span class=\"_ _1\"></span>, the Group c<span class=\"_ _4\"></span>hanged the defined<span class=\"_ _1a9\"> </span> benefit pension plan into a new defined contribution<span class=\"_ _1a9\"> </span> pension plan. All acquired rights up to J<span class=\"_ _4\"></span>une 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2009<span class=\"_ _25\"></span>, ar<span class=\"_ _4\"></span>e<span class=\"_ _1a9\"> </span> retained<span class=\"_ _1\"></span>. Therefore<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the Group has two pension plans: (i)<span class=\"_ _1a9\"> </span> the initial defined benefit plan and (ii) the pension plan,<span class=\"_ _1\"></span> which is a defined contribution p<span class=\"_ _4\"></span>lan in structure<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The assets of both plans ar<span class=\"_ _4\"></span>e held in separate trustee-ad<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ministered funds<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>According to the Belgian legislation app<span class=\"_ _4\"></span>licable to the<span class=\"_ _1a9\"> </span> second pillar pension plans (the minimum guar<span class=\"_ _4\"></span>anteed<span class=\"_ _1a9\"> </span> return under the so-called \u201cLaw V<span class=\"_ _1\"></span>andenbroucke\u201d)<span class=\"_ _1\"></span>, all<span class=\"_ _1a9\"> </span> Belgian pension plans that ar<span class=\"_ _4\"></span>e structured as defined con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tribution plans ar<span class=\"_ _4\"></span>e considered defined benefit plans under<span class=\"_ _1a9\"> </span> IFRS and therefor<span class=\"_ _4\"></span>e are accounted for as such.<span class=\"_ _1a9\"> </span>Because of this minimum guaranteed r<span class=\"_ _4\"></span>eturn,<span class=\"_ _4\"></span> the emplo<span class=\"_ _4\"></span>yer<span class=\"_ _1a9\"> </span> is exposed to a financial risk since further contributions<span class=\"_ _1a9\"> </span> could be required if the r<span class=\"_ _4\"></span>eturn on the assets is not suffi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cient to reach the minim<span class=\"_ _4\"></span>um benefits to be paid<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s commitments under defined benefit plans,<span class=\"_ _1\"></span> and the related costs,<span class=\"_ _1\"></span> are measured using the \u201cprojected<span class=\"_ _1a9\"> </span> unit credit method<span class=\"_ _1\"></span>\u201d with actuarial valuations being carried<span class=\"_ _1a9\"> </span> out at each balance sheet date b<span class=\"_ _4\"></span>y a qualified actuar<span class=\"_ _3\"></span>y<span class=\"_ _25\"></span>. Past<span class=\"_ _1a9\"> </span> ser<span class=\"_ _3\"></span>vice cost is included immediately to the extent that the<span class=\"_ _1a9\"> </span> benefits are alread<span class=\"_ _4\"></span>y vested<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> and other<span class=\"_ _23\"></span>wise the ser<span class=\"_ _3\"></span>vice is<span class=\"_ _1a9\"> </span>amortized on a straight-line basis over the aver<span class=\"_ _4\"></span>age period<span class=\"_ _1a9\"> </span>until the benefits become vested<span class=\"_ _4\"></span>. Remeasurements of the<span class=\"_ _1a9\"> </span>net defined obligation are r<span class=\"_ _4\"></span>ecognized directly within equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>The retir<span class=\"_ _4\"></span>ement benefit obligation recognized in the<span class=\"_ _1a9\"> </span>statement of financial position represents the f<span class=\"_ _4\"></span>air value of<span class=\"_ _1a9\"> </span>plan assets at the reporting date,<span class=\"_ _1\"></span> less plan liabilities calcu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lated using the projected unit credit method discounted<span class=\"_ _1a9\"> </span>to its present value using yields availab<span class=\"_ _4\"></span>le on high quality<span class=\"_ _1a9\"> </span>corporate bonds that have maturity dates appr<span class=\"_ _4\"></span>oximating<span class=\"_ _1a9\"> </span>to the terms of the liabilities and are denominated in the<span class=\"_ _1a9\"> </span>same currency as the post-emp<span class=\"_ _4\"></span>loyment benefit obliga<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tions less the effect of minimum funding requir<span class=\"_ _4\"></span>ements<span class=\"_ _1a9\"> </span>agreed with scheme tr<span class=\"_ _4\"></span>ustees.<span class=\"_ _1a9\"> </span>No other long- or short-term benefits are granted to<span class=\"_ _1a9\"> </span>emplo<span class=\"_ _4\"></span>yees<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Share-based compensation<span class=\"_ _1a9\"> </span>The Group oper<span class=\"_ _4\"></span>ates equity-settled<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> share-based compensa<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tion plans through whic<span class=\"_ _4\"></span>h it grants share subscription rights<span class=\"_ _1a9\"> </span>(giving the holder the right to subscribe to a specific number<span class=\"_ _1a9\"> </span>of shares in accordance with the shar<span class=\"_ _4\"></span>e option plan,<span class=\"_ _1\"></span> hereafter<span class=\"_ _3\"></span> referr<span class=\"_ _4\"></span>ed to as \u2018subscription rights<span class=\"_ _4\"></span>\u2019) to the CEO<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> personnel,<span class=\"_ _1a9\"> </span>and consultants as consideration in exchange f<span class=\"_ _4\"></span>or ser<span class=\"_ _3\"></span>vices<span class=\"_ _3\"></span> performed<span class=\"_ _4\"></span>. The fair value of the services received in exchange<span class=\"_ _1a9\"> </span>for the granting of the subscription rights is r<span class=\"_ _4\"></span>ecognized as<span class=\"_ _1a9\"> </span>an expense over the vesting period with a corr<span class=\"_ _4\"></span>esponding<span class=\"_ _1a9\"> </span>increase in equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>The total amount to be expensed o<span class=\"_ _4\"></span>ver the vesting period<span class=\"_ _1a9\"> </span>is determined by r<span class=\"_ _4\"></span>eference to the fair value at the date on<span class=\"_ _1a9\"> </span>which the subscription rights are gr<span class=\"_ _4\"></span>anted<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> measured using<span class=\"_ _3\"></span> the Black &amp; Scho<span class=\"_ _4\"></span>les model,<span class=\"_ _4\"></span> taking into account the term and<span class=\"_ _1a9\"> </span>conditions upon which the subscription rights w<span class=\"_ _4\"></span>ere granted<span class=\"_ _1a9\"> </span>excluding the impact of an<span class=\"_ _4\"></span>y non-market vesting conditions. A<span class=\"_ _4\"></span>t<span class=\"_ _1a9\"> </span>each balance sheet date<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the entity r<span class=\"_ _4\"></span>evises its estimates of the<span class=\"_ _1a9\"> </span>number of subscription rights that are expected to become<span class=\"_ _1a9\"> </span>exercisable except wher<span class=\"_ _4\"></span>e forfeiture is only due to shares not<span class=\"_ _1a9\"> </span>achieving the thresho<span class=\"_ _4\"></span>ld for vesting. It recognizes the impact<span class=\"_ _1a9\"> </span>of the revision of original estimates<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> if an<span class=\"_ _4\"></span>y<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> in the statement<span class=\"_ _1a9\"> </span>of profit and loss,<span class=\"_ _1\"></span> and a corresponding adjustment to equity<span class=\"_ _1a9\"> </span>over the r<span class=\"_ _4\"></span>emaining vesting period<span class=\"_ _4\"></span>. The pr<span class=\"_ _4\"></span>oceeds received<span class=\"_ _1\"></span>, net<span class=\"_ _1a9\"> </span>of any dir<span class=\"_ _4\"></span>ectly attributable tr<span class=\"_ _4\"></span>ansaction costs,<span class=\"_ _1\"></span> are credited to<span class=\"_ _1a9\"> </span>share capital (nominal value) and share pr<span class=\"_ _4\"></span>emium when the<span class=\"_ _1a9\"> </span>subscription rights are exercised<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForProvisionsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-40": {
   "value": "(M) <span class=\"_ _7d\"> </span>EMPL<span class=\"_ _4\"></span>O<span class=\"_ _4\"></span>YEE BENEFIT PLAN<span class=\"_ _1a9\"> </span>Short-term employee benefits<span class=\"_ _1a9\"> </span>Liabilities for wages and salaries that ar<span class=\"_ _4\"></span>e expected to be<span class=\"_ _1a9\"> </span>settled wholly within tw<span class=\"_ _4\"></span>elve months after the end of the<span class=\"_ _1a9\"> </span>period in which the emplo<span class=\"_ _4\"></span>y<span class=\"_ _4\"></span>ees render the related service<span class=\"_ _1a9\"> </span>are recognized in r<span class=\"_ _4\"></span>espect of emplo<span class=\"_ _4\"></span>yees<span class=\"_ _1\"></span>\u2019 ser<span class=\"_ _23\"></span>vices up to<span class=\"_ _1a9\"> </span>the end of the reporting period and are measured at<span class=\"_ _1a9\"> </span>the amounts expected to be paid when the liabilities are<span class=\"_ _1a9\"> </span>settled<span class=\"_ _4\"></span>. The liabilities ar<span class=\"_ _4\"></span>e presented as curr<span class=\"_ _4\"></span>ent emplo<span class=\"_ _4\"></span>yee<span class=\"_ _1a9\"> </span>benefit obligations in the statement of financial position.<span class=\"_ _1a9\"> </span>Pension benefits<span class=\"_ _1a9\"> </span>Starting July 1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2009<span class=\"_ _1\"></span>, the Group c<span class=\"_ _4\"></span>hanged the defined<span class=\"_ _1a9\"> </span>benefit pension plan into a new defined contribution<span class=\"_ _1a9\"> </span>pension plan. All acquired rights up to J<span class=\"_ _4\"></span>une 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2009<span class=\"_ _25\"></span>, ar<span class=\"_ _4\"></span>e<span class=\"_ _1a9\"> </span>retained<span class=\"_ _1\"></span>. Therefore<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the Group has two pension plans: (i)<span class=\"_ _1a9\"> </span>the initial defined benefit plan and (ii) the pension plan,<span class=\"_ _1\"></span> which is a defined contribution p<span class=\"_ _4\"></span>lan in structure<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The assets of both plans ar<span class=\"_ _4\"></span>e held in separate trustee-ad<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ministered funds<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>According to the Belgian legislation app<span class=\"_ _4\"></span>licable to the<span class=\"_ _1a9\"> </span>second pillar pension plans (the minimum guar<span class=\"_ _4\"></span>anteed<span class=\"_ _1a9\"> </span>return under the so-called \u201cLaw V<span class=\"_ _1\"></span>andenbroucke\u201d)<span class=\"_ _1\"></span>, all<span class=\"_ _1a9\"> </span>Belgian pension plans that ar<span class=\"_ _4\"></span>e structured as defined con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tribution plans ar<span class=\"_ _4\"></span>e considered defined benefit plans under<span class=\"_ _1a9\"> </span>IFRS and therefor<span class=\"_ _4\"></span>e are accounted for as such.<span class=\"_ _1a9\"> </span>Because of this minimum guaranteed r<span class=\"_ _4\"></span>eturn,<span class=\"_ _4\"></span> the emplo<span class=\"_ _4\"></span>yer<span class=\"_ _1a9\"> </span>is exposed to a financial risk since further contributions<span class=\"_ _1a9\"> </span>could be required if the r<span class=\"_ _4\"></span>eturn on the assets is not suffi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cient to reach the minim<span class=\"_ _4\"></span>um benefits to be paid<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s commitments under defined benefit plans,<span class=\"_ _1\"></span> and the related costs,<span class=\"_ _1\"></span> are measured using the \u201cprojected<span class=\"_ _1a9\"> </span>unit credit method<span class=\"_ _1\"></span>\u201d with actuarial valuations being carried<span class=\"_ _1a9\"> </span>out at each balance sheet date b<span class=\"_ _4\"></span>y a qualified actuar<span class=\"_ _3\"></span>y<span class=\"_ _25\"></span>. Past<span class=\"_ _1a9\"> </span>ser<span class=\"_ _3\"></span>vice cost is included immediately to the extent that the<span class=\"_ _1a9\"> </span>benefits are alread<span class=\"_ _4\"></span>y vested<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> and other<span class=\"_ _23\"></span>wise the ser<span class=\"_ _3\"></span>vice is<span class=\"_ _1a9\"> </span>amortized on a straight-line basis over the aver<span class=\"_ _4\"></span>age period<span class=\"_ _1a9\"> </span>until the benefits become vested<span class=\"_ _4\"></span>. Remeasurements of the<span class=\"_ _1a9\"> </span>net defined obligation are r<span class=\"_ _4\"></span>ecognized directly within equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>The retir<span class=\"_ _4\"></span>ement benefit obligation recognized in the<span class=\"_ _1a9\"> </span>statement of financial position represents the f<span class=\"_ _4\"></span>air value of<span class=\"_ _1a9\"> </span>plan assets at the reporting date,<span class=\"_ _1\"></span> less plan liabilities calcu<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lated using the projected unit credit method discounted<span class=\"_ _1a9\"> </span>to its present value using yields availab<span class=\"_ _4\"></span>le on high quality<span class=\"_ _1a9\"> </span>corporate bonds that have maturity dates appr<span class=\"_ _4\"></span>oximating<span class=\"_ _1a9\"> </span>to the terms of the liabilities and are denominated in the<span class=\"_ _1a9\"> </span>same currency as the post-emp<span class=\"_ _4\"></span>loyment benefit obliga<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tions less the effect of minimum funding requir<span class=\"_ _4\"></span>ements<span class=\"_ _1a9\"> </span>agreed with scheme tr<span class=\"_ _4\"></span>ustees.<span class=\"_ _1a9\"> </span>No other long- or short-term benefits are granted to<span class=\"_ _1a9\"> </span>emplo<span class=\"_ _4\"></span>yees<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Share-based compensation<span class=\"_ _1a9\"> </span>The Group oper<span class=\"_ _4\"></span>ates equity-settled<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> share-based compensa<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tion plans through whic<span class=\"_ _4\"></span>h it grants share subscription rights<span class=\"_ _1a9\"> </span>(giving the holder the right to subscribe to a specific number<span class=\"_ _1a9\"> </span>of shares in accordance with the shar<span class=\"_ _4\"></span>e option plan,<span class=\"_ _1\"></span> hereafter<span class=\"_ _3\"></span> referr<span class=\"_ _4\"></span>ed to as \u2018subscription rights<span class=\"_ _4\"></span>\u2019) to the CEO<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> personnel,<span class=\"_ _1a9\"> </span>and consultants as consideration in exchange f<span class=\"_ _4\"></span>or ser<span class=\"_ _3\"></span>vices<span class=\"_ _3\"></span> performed<span class=\"_ _4\"></span>. The fair value of the services received in exchange<span class=\"_ _1a9\"> </span>for the granting of the subscription rights is r<span class=\"_ _4\"></span>ecognized as<span class=\"_ _1a9\"> </span>an expense over the vesting period with a corr<span class=\"_ _4\"></span>esponding<span class=\"_ _1a9\"> </span>increase in equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>The total amount to be expensed o<span class=\"_ _4\"></span>ver the vesting period<span class=\"_ _1a9\"> </span>is determined by r<span class=\"_ _4\"></span>eference to the fair value at the date on<span class=\"_ _1a9\"> </span>which the subscription rights are gr<span class=\"_ _4\"></span>anted<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> measured using<span class=\"_ _3\"></span> the Black &amp; Scho<span class=\"_ _4\"></span>les model,<span class=\"_ _4\"></span> taking into account the term and<span class=\"_ _1a9\"> </span>conditions upon which the subscription rights w<span class=\"_ _4\"></span>ere granted<span class=\"_ _1a9\"> </span>excluding the impact of an<span class=\"_ _4\"></span>y non-market vesting conditions. A<span class=\"_ _4\"></span>t<span class=\"_ _1a9\"> </span>each balance sheet date<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the entity r<span class=\"_ _4\"></span>evises its estimates of the<span class=\"_ _1a9\"> </span>number of subscription rights that are expected to become<span class=\"_ _1a9\"> </span>exercisable except wher<span class=\"_ _4\"></span>e forfeiture is only due to shares not<span class=\"_ _1a9\"> </span>achieving the thresho<span class=\"_ _4\"></span>ld for vesting. It recognizes the impact<span class=\"_ _1a9\"> </span>of the revision of original estimates<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> if an<span class=\"_ _4\"></span>y<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> in the statement<span class=\"_ _1a9\"> </span>of profit and loss,<span class=\"_ _1\"></span> and a corresponding adjustment to equity<span class=\"_ _1a9\"> </span>over the r<span class=\"_ _4\"></span>emaining vesting period<span class=\"_ _4\"></span>. The pr<span class=\"_ _4\"></span>oceeds received<span class=\"_ _1\"></span>, net<span class=\"_ _1a9\"> </span>of any dir<span class=\"_ _4\"></span>ectly attributable tr<span class=\"_ _4\"></span>ansaction costs,<span class=\"_ _1\"></span> are credited to<span class=\"_ _1a9\"> </span>share capital (nominal value) and share pr<span class=\"_ _4\"></span>emium when the<span class=\"_ _1a9\"> </span>subscription rights are exercised<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForEmployeeBenefitsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-99": {
   "value": "of the revision of original estimates, if any, in the statement of profit and loss, and a corresponding adjustment to equity over the remaining vesting period. The proceeds received, net of any directly attributable transaction costs, are credited to share capital (nominal value) and share premium when the subscription rights are exercised. (N)  FINANCIAL INSTRUMENTS Financial assets INITIAL RECOGNITION AND MEASUREMENT Financial assets are classified, at initial recognition, and subse- quently measured, at either amortized cost, fair value through other comprehensive income (\u201cOCI\u201d) or fair value through profit or loss. The classification of financial assets at initial recognition depends on the financial asset\u2019s contractual cash flow char- acteristics and the Company\u2019s business model for managing them. With the exception of trade receivables that do not contain a significant financing component, the Company initially measures a financial asset at its fair value plus, in the case of a financial asset not at fair value through profit or loss, transaction costs. Trade receivables that do not contain a significant financing component are measured initially at the transaction price de- termined under IFRS 15. In order for a financial asset to be classified and measured at amortized cost or fair value through OCI, it needs to give rise to cash flows that are \u2018solely payments of principal and interest\u2019 (\u201cSPPI\u201d) on the principal amount outstanding. This assessment is referred to as the SPPI test and is performed at an instrument level. The Company\u2019s business model for managing financial assets refers to how it manages its financial assets in order to generate cash flows. The business model determines whether cash flows will result from collecting contractual cash flows, selling the financial assets, or both . 85 OXURION ANNUAL REPORT 2022 SUBSEQUENT MEASUREMENT For purposes of subsequent measurement, the following cat- egories of financial assets are relevant to the Company: \u2022  Financial assets at amortized costs (trade receivables, term deposits); and \u2022  Financial assets at fair value through OCI (investments in  debt instruments (bonds)). FINANCIAL ASSETS AT AMORTIZED COST This category is the most relevant to the Company. The  Company measures financial assets at amortized cost if both of the following conditions are met:  \u2022  The financial asset is held within a business model with  the objective to hold financial assets in order to collect  contractual cash flows; and  \u2022  The contractual terms of the financial asset give rise on  specified dates to cash flows that are solely payments of  principal and interest on the principal amount outstanding.  Financial assets at amortized cost are subsequently measured  using the effective interest rate (\u201cEIR\u201d) method and are subject  to impairment. Gains and losses are recognized in profit or  loss when the asset is derecognized, modified or impaired. The Company\u2019s financial assets at amortized cost mainly  includes trade receivables and term deposits . FINANCIAL ASSETS THROUGH OCI (DEBT INSTRUMENTS) The Company measures debt instruments at fair value  through OCI if both of the following conditions are met: \u2022  The financial asset is held within a business model with  the objective of both holding to collect contractual cash  flows and selling; and \u2022  The contractual terms of the financial asset give rise on  specified dates to cash flows that are solely payments of  principal and interest on the principal amount outstanding. For debt instruments at fair value through OCI, interest  income, foreign exchange revaluation and impairment losses  or reversals are recognized in the statement of profit or loss  and computed in the same manner as for financial assets  measured at amortized cost. The remaining fair value changes  are recognized in OCI. Upon derecognition, the cumulative fair  value change recognized in OCI is recycled to profit or loss. The Company\u2019s debt instruments at fair value through OCI  includes investments in quoted debt instruments (bonds). DERECOGNITION A financial asset (or, where applicable, a part of a financial asset or part of a group of similar financial assets) is primarily derecognized (i.e., removed from the Company\u2019s consolidated  statement of financial position) when:  \u2022  The rights to receive cash flows from the asset have  expired; or  \u2022  The Company has transferred its rights to receive cash  flows from the asset or has assumed an obligation to  pay the received cash flows in full without material delay  to a third party under a \u2018pass-through\u2019 arrangement and  either (a) the Company has transferred substantially all  the risks and rewards of the asset, or (b) the Company  has neither transferred nor retained substantially all the  risks and rewards of the asset but has transferred control  of the asset. I MPAIRMENT OF FINANCIAL ASSETS The Company recognizes an allowance for expected credit  losses (\u201cECLs\u201d) for all debt instruments not held at fair value  through profit or loss. ECLs are based on the difference  between the contractual cash flows due in accordance with  the contract and all the cash flows that the Company expects  to receive, discounted at an approximation of the original  effective interest rate. The expected cash flows will include  cash flows from the sale of collateral held or other credit en- hancements that are integral to the contractual terms . For trade receivables and term deposits, the Company applies a simplified approach in calculating ECLs. Therefore, the Company does not track changes in credit risk, but instead recognizes a loss allowance based on lifetime ECLs at each reporting date. Upon impairment, the carrying amount of the financial assets is directly reduced by the impairment loss, with the exception of trade receivables. For trade receivables, the carrying amount is reduced by means of a separate impairment account. If a trade receivable is considered uncollectible, it is written off in the impairment account. Subsequent collection of amounts that had previously been written off is credited in the impair- ment account. Modifications in the carrying amount of the impairment account are recognized in the statement of profit and loss. CASH AND CASH EQUIVALENTS Cash and cash equivalents comprise demand deposits and other short-term, highly liquid investments (with less than three months to maturity) that are readily convertible into a known amount of cash and are subject to an insig- nificant risk of fluctuations in value . Financial liabilities DISTINCTION BETWEEN FINANCIAL LIABILITIES AND EQUITY Financial liabilities and equity instruments issued by the Group are classified according to the substance of the contractual arrangements entered into and the definitions of a financial liability and an equity instrument. An equity instrument is any contract that evidences a residual interest in the assets of the Group after deducting all its liabilities. The accounting policies adopted for specific financial liabilities and equity instruments are set out below. INITIAL RECOGNITION AND MEASUREMENT Financial liabilities are classified, at initial recognition, at fair value through profit or loss, loans and borrowings, payables, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. All financial liabilities are recognized initially at fair value and, in the case of loans and borrowings and payables, net of directly attributable transaction costs. The Company\u2019s financial liabilities include trade and other payables and convertible loans. SUBSEQUENT MEASUREMENT For purposes of subsequent measurement, financial liabili- ties are classified in two categories: \u2022  Financial liabilities at fair value through profit or loss \u2022  Financial liabilities at amortized cost (loans and borrowings) Financial liabilities at fair value through profit and loss include financial liabilities designated upon initial recogni- tion as at fair value through profit or loss and only if the criteria in IFRS 9 are satisfied. The Group has designated convertible loans at fair value through profit and loss, since the convertible loans contain embedded derivatives for which assessment of whether it is required to separate the embedded derivative from the host contract to measure the derivative at fair value, would be more complex or result in less reliable measures than measuring the entire instrument at fair value through profit or loss As such the conditions in IFRS 9 4.3.5 are met and designation at fair value through profit or loss is permitted. The convertible loans are measured at fair value through profit or loss, using the valuation methods described in note 5.7.11. Transaction costs in relation to these financial liabilities at fair value through profit or loss are expensed as incurred and included in the line item \u2018Finance expense\u2019 in the consolidated statement of profit and los s. Trade and other payables are subsequently measured at amortized cost, using the effective interest rate metho d ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDerivativeFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-15": {
   "value": "(N)  FINANCIAL INSTRUMENTS Financial assets INITIAL RECOGNITION AND MEASUREMENT Financial assets are classified, at initial recognition, and subse- quently measured, at either amortized cost, fair value through other comprehensive income (\u201cOCI\u201d) or fair value through profit or loss. The classification of financial assets at initial recognition depends on the financial asset\u2019s contractual cash flow char- acteristics and the Company\u2019s business model for managing them. With the exception of trade receivables that do not contain a significant financing component, the Company initially measures a financial asset at its fair value plus, in the case of a financial asset not at fair value through profit or loss, transaction costs. Trade receivables that do not contain a significant financing component are measured initially at the transaction price de- termined under IFRS 15. In order for a financial asset to be classified and measured at amortized cost or fair value through OCI, it needs to give rise to cash flows that are \u2018solely payments of principal and interest\u2019 (\u201cSPPI\u201d) on the principal amount outstanding. This assessment is referred to as the SPPI test and is performed at an instrument level. The Company\u2019s business model for managing financial assets refers to how it manages its financial assets in order to generate cash flows. The business model determines whether cash flows will result from collecting contractual cash flows, selling the financial assets, or both . SUBSEQUENT MEASUREMENT For purposes of subsequent measurement, the following cat- egories of financial assets are relevant to the Company: \u2022  Financial assets at amortized costs (trade receivables, term deposits); and \u2022  Financial assets at fair value through OCI (investments in debt instruments (bonds)). FINANCIAL ASSETS AT AMORTIZED COST This category is the most relevant to the Company. The Company measures financial assets at amortized cost if both of the following conditions are met: \u2022  The financial asset is held within a business model with the objective to hold financial assets in order to collect contractual cash flows; and \u2022  The contractual terms of the financial asset give rise on specified dates to cash flows that are solely payments of principal and interest on the principal amount outstanding.  Financial assets at amortized cost are subsequently measured using the effective interest rate (\u201cEIR\u201d) method and are subject to impairment. Gains and losses are recognized in profit or loss when the asset is derecognized, modified or impaired. The Company\u2019s financial assets at amortized cost mainly includes trade receivables and term deposits . FINANCIAL ASSETS THROUGH OCI (DEBT INSTRUMENTS) The Company measures debt instruments at fair value through OCI if both of the following conditions are met: \u2022  The financial asset is held within a business model with the objective of both holding to collect contractual cash flows and selling; and \u2022  The contractual terms of the financial asset give rise on specified dates to cash flows that are solely payments of principal and interest on the principal amount outstanding. For debt instruments at fair value through OCI, interest income, foreign exchange revaluation and impairment losses or reversals are recognized in the statement of profit or loss and computed in the same manner as for financial assets measured at amortized cost. The remaining fair value changes are recognized in OCI. Upon derecognition, the cumulative fair value change recognized in OCI is recycled to profit or loss. The Company\u2019s debt instruments at fair value through OCI includes investments in quoted debt instruments (bonds). DERECOGNITION A financial asset (or, where applicable, a part of a financial asset or part of a group of similar financial assets) is primarily derecognized (i.e., removed from the Company\u2019s consolidated statement of financial position) when: \u2022  The rights to receive cash flows from the asset have expired; or \u2022  The Company has transferred its rights to receive cash flows from the asset or has assumed an obligation to pay the received cash flows in full without material delay to a third party under a \u2018pass-through\u2019 arrangement and either (a) the Company has transferred substantially all the risks and rewards of the asset, or (b) the Company has neither transferred nor retained substantially all the risks and rewards of the asset but has transferred control of the asset. I MPAIRMENT OF FINANCIAL ASSETS The Company recognizes an allowance for expected credit losses (\u201cECLs\u201d) for all debt instruments not held at fair value through profit or loss. ECLs are based on the difference between the contractual cash flows due in accordance with the contract and all the cash flows that the Company expects to receive, discounted at an approximation of the original effective interest rate. The expected cash flows will include cash flows from the sale of collateral held or other credit en- hancements that are integral to the contractual terms . For trade receivables and term deposits, the Company applies INITIAL RECOGNITION AND MEASUREMENT a simplified approach in calculating ECLs. Therefore, the Financial liabilities are classified, at initial recognition, at fair Company does not track changes in credit risk, but instead value through profit or loss, loans and borrowings, payables, recognizes a loss allowance based on lifetime ECLs at each or as derivatives designated as hedging instruments in an reporting date. effective hedge, as appropriate. All financial liabilities are recognized initially at fair value and, in the case of loans Upon impairment, the carrying amount of the financial assets and borrowings and payables, net of directly attributable is directly reduced by the impairment loss, with the exception transaction costs. of trade receivables. For trade receivables, the carrying amount is reduced by means of a separate impairment account. If a The Company\u2019s financial liabilities include trade and other trade receivable is considered uncollectible, it is written off in payables and convertible loans. the impairment account. Subsequent collection of amounts that had previously been written off is credited in the impair- SUBSEQUENT MEASUREMENT ment account. Modifications in the carrying amount of the impairment account are recognized in the statement of profit For purposes of subsequent measurement, financial liabili- and loss. ties are classified in two categories: CASH AND CASH EQUIVALENTS \u2022  Financial liabilities at fair value through profit or loss \u2022  Financial liabilities at amortized cost (loans and Cash and cash equivalents comprise demand deposits borrowings) and other short-term, highly liquid investments (with less than three months to maturity) that are readily convertible Financial liabilities at fair value through profit and loss into a known amount of cash and are subject to an insig- include financial liabilities designated upon initial recogni- nificant risk of fluctuations in value . tion as at fair value through profit or loss and only if the criteria in IFRS 9 are satisfied. The Group has designated Financial liabilities convertible loans at fair value through profit and loss, since the convertible loans contain embedded derivatives for DISTINCTION BETWEEN FINANCIAL LIABILITIES which assessment of whether it is required to separate the AND EQUITY embedded derivative from the host contract to measure Financial liabilities and equity instruments issued by the Group the derivative at fair value, would be more complex or are classified according to the substance of the contractual result in less reliable measures than measuring the entire arrangements entered into and the definitions of a financial instrument at fair value through profit or loss As such the liability and an equity instrument. An equity instrument is any conditions in IFRS 9 4.3.5 are met and designation at fair contract that evidences a residual interest in the assets of the value through profit or loss is permitted. Group after deducting all its liabilities. The accounting policies adopted for specific financial liabilities and equity instruments The convertible loans are measured at fair value through are set out below. profit or loss, using the valuation methods described in note 5.7.11. Transaction costs in relation to these financial liabilities at fair value through profit or loss are expensed as incurred and included in the line item \u2018Finance expense\u2019 in the consolidated statement of profit and los s. Trade and other payables are subsequently measured at amortized cost, using the effective interest rate metho d ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-41": {
   "value": "(N)  FINANCIAL INSTRUMENTS Financial assets INITIAL RECOGNITION AND MEASUREMENT Financial assets are classified, at initial recognition, and subse- quently measured, at either amortized cost, fair value through other comprehensive income (\u201cOCI\u201d) or fair value through profit or loss. The classification of financial assets at initial recognition depends on the financial asset\u2019s contractual cash flow char- acteristics and the Company\u2019s business model for managing them. With the exception of trade receivables that do not contain a significant financing component, the Company initially measures a financial asset at its fair value plus, in the case of a financial asset not at fair value through profit or loss, transaction costs. Trade receivables that do not contain a significant financing component are measured initially at the transaction price de- termined under IFRS 15. In order for a financial asset to be classified and measured at amortized cost or fair value through OCI, it needs to give rise to cash flows that are \u2018solely payments of principal and interest\u2019 (\u201cSPPI\u201d) on the principal amount outstanding. This assessment is referred to as the SPPI test and is performed at an instrument level. The Company\u2019s business model for managing financial assets refers to how it manages its financial assets in order to generate cash flows. The business model determines whether cash flows will result from collecting contractual cash flows, selling the financial assets, or both . For trade receivables and term deposits, the Company applies  INITIAL RECOGNITION AND MEASUREMENT a simplified approach in calculating ECLs. Therefore, the Financial liabilities are classified, at initial recognition, at fair  Company does not track changes in credit risk, but instead  value through profit or loss, loans and borrowings, payables, recognizes a loss allowance based on lifetime ECLs at each  or as derivatives designated as hedging instruments in an  reporting date. effective hedge, as appropriate. All financial liabilities are  recognized initially at fair value and, in the case of loans  Upon impairment, the carrying amount of the financial assets and borrowings and payables, net of directly attributable  is directly reduced by the impairment loss, with the exception transaction costs.  of trade receivables. For trade receivables, the carrying amount is reduced by means of a separate impairment account. If a  The Company\u2019s financial liabilities include trade and other  trade receivable is considered uncollectible, it is written off in payables and convertible loans.  the impairment account. Subsequent collection of amounts  that had previously been written off is credited in the impair- SUBSEQUENT MEASUREMENT ment account. Modifications in the carrying amount of the impairment account are recognized in the statement of profit  For purposes of subsequent measurement, financial liabili- and loss. ties are classified in two categories: CASH AND CASH EQUIVALENTS \u2022  Financial liabilities at fair value through profit or loss \u2022  Financial liabilities at amortized cost (loans and  Cash and cash equivalents comprise demand deposits  borrowings) and other short-term, highly liquid investments (with less  than three months to maturity) that are readily convertible  Financial liabilities at fair value through profit and loss  into a known amount of cash and are subject to an insig- include financial liabilities designated upon initial recogni- nificant risk of fluctuations in value SUBSEQUENT MEASUREMENT For purposes of subsequent measurement, the following cat- egories of financial assets are relevant to the Company: \u2022  Financial assets at amortized costs (trade receivables, term deposits); and \u2022  Financial assets at fair value through OCI (investments in  debt instruments (bonds)). FINANCIAL ASSETS AT AMORTIZED COST This category is the most relevant to the Company. The  Company measures financial assets at amortized cost if both of the following conditions are met:  \u2022  The financial asset is held within a business model with  the objective to hold financial assets in order to collect  contractual cash flows; and  \u2022  The contractual terms of the financial asset give rise on  specified dates to cash flows that are solely payments of  principal and interest on the principal amount outstanding.  Financial assets at amortized cost are subsequently measured  using the effective interest rate (\u201cEIR\u201d) method and are subject  to impairment. Gains and losses are recognized in profit or  loss when the asset is derecognized, modified or impaired. The Company\u2019s financial assets at amortized cost mainly  includes trade receivables and term deposits . FINANCIAL ASSETS THROUGH OCI (DEBT INSTRUMENTS) The Company measures debt instruments at fair value  through OCI if both of the following conditions are met: \u2022  The financial asset is held within a business model with  the objective of both holding to collect contractual cash  flows and selling; and \u2022  The contractual terms of the financial asset give rise on  specified dates to cash flows that are solely payments of  principal and interest on the principal amount outstanding. For debt instruments at fair value through OCI, interest  income, foreign exchange revaluation and impairment losses  or reversals are recognized in the statement of profit or loss  and computed in the same manner as for financial assets  measured at amortized cost. The remaining fair value changes  are recognized in OCI. Upon derecognition, the cumulative fair  value change recognized in OCI is recycled to profit or loss. The Company\u2019s debt instruments at fair value through OCI  includes investments in quoted debt instruments (bonds). DERECOGNITION A financial asset (or, where applicable, a part of a financial asset or part of a group of similar financial assets) is primarily derecognized (i.e., removed from the Company\u2019s consolidated  statement of financial position) when:  \u2022  The rights to receive cash flows from the asset have  expired; or  \u2022  The Company has transferred its rights to receive cash  flows from the asset or has assumed an obligation to  pay the received cash flows in full without material delay  to a third party under a \u2018pass-through\u2019 arrangement and  either (a) the Company has transferred substantially all  the risks and rewards of the asset, or (b) the Company  has neither transferred nor retained substantially all the  risks and rewards of the asset but has transferred control  of the asset. I MPAIRMENT OF FINANCIAL ASSETS The Company recognizes an allowance for expected credit  losses (\u201cECLs\u201d) for all debt instruments not held at fair value  through profit or loss. ECLs are based on the difference  between the contractual cash flows due in accordance with  the contract and all the cash flows that the Company expects  to receive, discounted at an approximation of the original  effective interest rate. The expected cash flows will include  cash flows from the sale of collateral held or other credit en- hancements that are integral to the contractual terms . ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinancialAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-111": {
   "value": "(N)  FINANCIAL INSTRUMENTS Financial assets INITIAL RECOGNITION AND MEASUREMENT Financial assets are classified, at initial recognition, and subse- quently measured, at either amortized cost, fair value through other comprehensive income (\u201cOCI\u201d) or fair value through profit or loss. Financial liabilities DISTINCTION BETWEEN FINANCIAL LIABILITIES AND EQUITY Financial liabilities and equity instruments issued by the Group are classified according to the substance of the contractual arrangements entered into and the definitions of a financial liability and an equity instrument. An equity instrument is any contract that evidences a residual interest in the assets of the Group after deducting all its liabilities. The accounting policies adopted for specific financial liabilities and equity instruments are set out below. Trade and other payables are subsequently measured at amortized cost, using the effective interest rate metho d . INITIAL RECOGNITION AND MEASUREMENT Financial liabilities are classified, at initial recognition, at fair value through profit or loss, loans and borrowings, payables, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. All financial liabilities are recognized initially at fair value and, in the case of loans and borrowings and payables, net of directly attributable transaction costs. The Company\u2019s financial liabilities include trade and other payables and convertible loans. SUBSEQUENT MEASUREMENT For purposes of subsequent measurement, financial liabili- ties are classified in two categories: \u2022  Financial liabilities at fair value through profit or loss \u2022  Financial liabilities at amortized cost (loans and borrowings) Financial liabilities at fair value through profit and loss include financial liabilities designated upon initial recogni- tion as at fair value through profit or loss and only if the criteria in IFRS 9 are satisfied. The Group has designated convertible loans at fair value through profit and loss, since the convertible loans contain embedded derivatives for which assessment of whether it is required to separate the embedded derivative from the host contract to measure the derivative at fair value, would be more complex or result in less reliable measures than measuring the entire instrument at fair value through profit or loss As such the conditions in IFRS 9 4.3.5 are met and designation at fair value through profit or loss is permitted. The convertible loans are measured at fair value through profit or loss, using the valuation methods described in note 5.7.11. Transaction costs in relation to these financial liabilities at fair value through profit or loss are expensed as incurred and included in the line item \u2018Finance expense\u2019 in the consolidated statement of profit and los s. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinancialInstrumentsAtFairValueThroughProfitOrLossExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-127": {
   "value": "(N)  FINANCIAL INSTRUMENTS Financial assets INITIAL RECOGNITION AND MEASUREMENT Financial assets are classified, at initial recognition, and subse- quently measured, at either amortized cost, fair value through other comprehensive income (\u201cOCI\u201d) or fair value through profit or loss. The classification of financial assets at initial recognition depends on the financial asset\u2019s contractual cash flow char- acteristics and the Company\u2019s business model for managing them. With the exception of trade receivables that do not contain a significant financing component, the Company initially measures a financial asset at its fair value plus, in the case of a financial asset not at fair value through profit or loss, transaction costs. Trade receivables that do not contain a significant financing component are measured initially at the transaction price de- termined under IFRS 15. In order for a financial asset to be classified and measured at amortized cost or fair value through OCI, it needs to give rise to cash flows that are \u2018solely payments of principal and interest\u2019 (\u201cSPPI\u201d) on the principal amount outstanding. This assessment is referred to as the SPPI test and is performed at an instrument level. The Company\u2019s business model for managing financial assets refers to how it manages its financial assets in order to generate cash flows. The business model determines whether cash flows will result from collecting contractual cash flows, selling the financial assets, or both . SUBSEQUENT MEASUREMENT For purposes of subsequent measurement, the following cat- egories of financial assets are relevant to the Company: \u2022  Financial assets at amortized costs (trade receivables, term deposits); and \u2022  Financial assets at fair value through OCI (investments in  debt instruments (bonds)). FINANCIAL ASSETS AT AMORTIZED COST This category is the most relevant to the Company. The  Company measures financial assets at amortized cost if both of the following conditions are met:  \u2022  The financial asset is held within a business model with  the objective to hold financial assets in order to collect  contractual cash flows; and  \u2022  The contractual terms of the financial asset give rise on  specified dates to cash flows that are solely payments of  principal and interest on the principal amount outstanding.  Financial assets at amortized cost are subsequently measured  using the effective interest rate (\u201cEIR\u201d) method and are subject  to impairment. Gains and losses are recognized in profit or  loss when the asset is derecognized, modified or impaired. The Company\u2019s financial assets at amortized cost mainly  includes trade receivables and term deposits . FINANCIAL ASSETS THROUGH OCI (DEBT INSTRUMENTS) The Company measures debt instruments at fair value  through OCI if both of the following conditions are met: \u2022  The financial asset is held within a business model with  the objective of both holding to collect contractual cash  flows and selling; and \u2022  The contractual terms of the financial asset give rise on  specified dates to cash flows that are solely payments of  principal and interest on the principal amount outstanding. For debt instruments at fair value through OCI, interest  income, foreign exchange revaluation and impairment losses  or reversals are recognized in the statement of profit or loss  and computed in the same manner as for financial assets  measured at amortized cost. The remaining fair value changes  are recognized in OCI. Upon derecognition, the cumulative fair  value change recognized in OCI is recycled to profit or loss. The Company\u2019s debt instruments at fair value through OCI  includes investments in quoted debt instruments (bonds). DERECOGNITION A financial asset (or, where applicable, a part of a financial asset or part of a group of similar financial assets) is primarily derecognized (i.e., removed from the Company\u2019s consolidated  statement of financial position) when:  \u2022  The rights to receive cash flows from the asset have  expired; or  \u2022  The Company has transferred its rights to receive cash  flows from the asset or has assumed an obligation to  pay the received cash flows in full without material delay  to a third party under a \u2018pass-through\u2019 arrangement and  either (a) the Company has transferred substantially all  the risks and rewards of the asset, or (b) the Company  has neither transferred nor retained substantially all the  risks and rewards of the asset but has transferred control  of the asset. I MPAIRMENT OF FINANCIAL ASSETS The Company recognizes an allowance for expected credit  losses (\u201cECLs\u201d) for all debt instruments not held at fair value  through profit or loss. ECLs are based on the difference  between the contractual cash flows due in accordance with  the contract and all the cash flows that the Company expects  to receive, discounted at an approximation of the original  effective interest rate. The expected cash flows will include  cash flows from the sale of collateral held or other credit en- hancements that are integral to the contractual terms For trade receivables and term deposits, the Company applies a simplified approach in calculating ECLs. Therefore, the Company does not track changes in credit risk, but instead recognizes a loss allowance based on lifetime ECLs at each reporting date. Upon impairment, the carrying amount of the financial assets is directly reduced by the impairment loss, with the exception of trade receivables. For trade receivables, the carrying amount is reduced by means of a separate impairment account. If a trade receivable is considered uncollectible, it is written off in the impairment account. Subsequent collection of amounts that had previously been written off is credited in the impair- ment account. Modifications in the carrying amount of the impairment account are recognized in the statement of profit and loss. CASH AND CASH EQUIVALENTS Cash and cash equivalents comprise demand deposits and other short-term, highly liquid investments (with less than three months to maturity) that are readily convertible into a known amount of cash and are subject to an insig- nificant risk of fluctuations in value . Financial liabilities DISTINCTION BETWEEN FINANCIAL LIABILITIES AND EQUITY Financial liabilities and equity instruments issued by the Group are classified according to the substance of the contractual arrangements entered into and the definitions of a financial liability and an equity instrument. An equity instrument is any contract that evidences a residual interest in the assets of the Group after deducting all its liabilities. The accounting policies adopted for specific financial liabilities and equity instruments are set out below. INITIAL RECOGNITION AND MEASUREMENT Financial liabilities are classified, at initial recognition, at fair value through profit or loss, loans and borrowings, payables, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. All financial liabilities are recognized initially at fair value and, in the case of loans and borrowings and payables, net of directly attributable transaction costs. The Company\u2019s financial liabilities include trade and other payables and convertible loans. SUBSEQUENT MEASUREMENT For purposes of subsequent measurement, financial liabili- ties are classified in two categories: \u2022  Financial liabilities at fair value through profit or loss \u2022  Financial liabilities at amortized cost (loans and borrowings) Financial liabilities at fair value through profit and loss include financial liabilities designated upon initial recogni- tion as at fair value through profit or loss and only if the criteria in IFRS 9 are satisfied. The Group has designated convertible loans at fair value through profit and loss, since the convertible loans contain embedded derivatives for which assessment of whether it is required to separate the embedded derivative from the host contract to measure the derivative at fair value, would be more complex or result in less reliable measures than measuring the entire instrument at fair value through profit or loss As such the conditions in IFRS 9 4.3.5 are met and designation at fair value through profit or loss is permitted. The convertible loans are measured at fair value through profit or loss, using the valuation methods described in note 5.7.11. Transaction costs in relation to these financial liabilities at fair value through profit or loss are expensed as incurred and included in the line item \u2018Finance expense\u2019 in the consolidated statement of profit and los s. Trade and other payables are subsequently measured at amortized cost, using the effective interest rate metho d . ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDerivativeFinancialInstrumentsAndHedgingExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-60": {
   "value": "Share-based compensation<span class=\"_ _1a9\"> </span>The Group oper<span class=\"_ _4\"></span>ates equity-settled<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> share-based compensa<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tion plans through whic<span class=\"_ _4\"></span>h it grants share subscription rights<span class=\"_ _1a9\"> </span>(giving the holder the right to subscribe to a specific number<span class=\"_ _1a9\"> </span>of shares in accordance with the shar<span class=\"_ _4\"></span>e option plan,<span class=\"_ _1\"></span> hereafter<span class=\"_ _3\"></span> referr<span class=\"_ _4\"></span>ed to as \u2018subscription rights<span class=\"_ _4\"></span>\u2019) to the CEO<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> personnel,<span class=\"_ _1a9\"> </span>and consultants as consideration in exchange f<span class=\"_ _4\"></span>or ser<span class=\"_ _3\"></span>vices<span class=\"_ _3\"></span> performed<span class=\"_ _4\"></span>. The fair value of the services received in exchange<span class=\"_ _1a9\"> </span>for the granting of the subscription rights is r<span class=\"_ _4\"></span>ecognized as<span class=\"_ _1a9\"> </span>an expense over the vesting period with a corr<span class=\"_ _4\"></span>esponding<span class=\"_ _1a9\"> </span>increase in equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>The total amount to be expensed o<span class=\"_ _4\"></span>ver the vesting period<span class=\"_ _1a9\"> </span>is determined by r<span class=\"_ _4\"></span>eference to the fair value at the date on<span class=\"_ _1a9\"> </span>which the subscription rights are gr<span class=\"_ _4\"></span>anted<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> measured using<span class=\"_ _3\"></span> the Black &amp; Scho<span class=\"_ _4\"></span>les model,<span class=\"_ _4\"></span> taking into account the term and<span class=\"_ _1a9\"> </span>conditions upon which the subscription rights w<span class=\"_ _4\"></span>ere granted<span class=\"_ _1a9\"> </span>excluding the impact of an<span class=\"_ _4\"></span>y non-market vesting conditions. A<span class=\"_ _4\"></span>t<span class=\"_ _1a9\"> </span>each balance sheet date<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the entity r<span class=\"_ _4\"></span>evises its estimates of the<span class=\"_ _1a9\"> </span>number of subscription rights that are expected to become<span class=\"_ _1a9\"> </span>exercisable except wher<span class=\"_ _4\"></span>e forfeiture is only due to shares not<span class=\"_ _1a9\"> </span>achieving the thresho<span class=\"_ _4\"></span>ld for vesting. It recognizes the impact<span class=\"_ _1a9\"> </span>of the revision of original estimates<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> if an<span class=\"_ _4\"></span>y<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> in the statement<span class=\"_ _1a9\"> </span>of profit and loss,<span class=\"_ _1\"></span> and a corresponding adjustment to equity<span class=\"_ _1a9\"> </span>over the r<span class=\"_ _4\"></span>emaining vesting period<span class=\"_ _4\"></span>. The pr<span class=\"_ _4\"></span>oceeds received<span class=\"_ _1\"></span>, net<span class=\"_ _1a9\"> </span>of any dir<span class=\"_ _4\"></span>ectly attributable tr<span class=\"_ _4\"></span>ansaction costs,<span class=\"_ _1\"></span> are credited to<span class=\"_ _1a9\"> </span>share capital (nominal value) and share pr<span class=\"_ _4\"></span>emium when the<span class=\"_ _1a9\"> </span>subscription rights are exercised<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForSharebasedPaymentTransactionsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-84": {
   "value": "Share-based compensation<span class=\"_ _1a9\"> </span>The Group oper<span class=\"_ _4\"></span>ates equity-settled<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> share-based compensa<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tion plans through whic<span class=\"_ _4\"></span>h it grants share subscription rights<span class=\"_ _1a9\"> </span>(giving the holder the right to subscribe to a specific number<span class=\"_ _1a9\"> </span>of shares in accordance with the shar<span class=\"_ _4\"></span>e option plan,<span class=\"_ _1\"></span> hereafter<span class=\"_ _3\"></span> referr<span class=\"_ _4\"></span>ed to as \u2018subscription rights<span class=\"_ _4\"></span>\u2019) to the CEO<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> personnel,<span class=\"_ _1a9\"> </span>and consultants as consideration in exchange f<span class=\"_ _4\"></span>or ser<span class=\"_ _3\"></span>vices<span class=\"_ _3\"></span> performed<span class=\"_ _4\"></span>. The fair value of the services received in exchange<span class=\"_ _1a9\"> </span>for the granting of the subscription rights is r<span class=\"_ _4\"></span>ecognized as<span class=\"_ _1a9\"> </span>an expense over the vesting period with a corr<span class=\"_ _4\"></span>esponding<span class=\"_ _1a9\"> </span>increase in equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>The total amount to be expensed o<span class=\"_ _4\"></span>ver the vesting period<span class=\"_ _1a9\"> </span>is determined by r<span class=\"_ _4\"></span>eference to the fair value at the date on<span class=\"_ _1a9\"> </span>which the subscription rights are gr<span class=\"_ _4\"></span>anted<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> measured using<span class=\"_ _3\"></span> the Black &amp; Scho<span class=\"_ _4\"></span>les model,<span class=\"_ _4\"></span> taking into account the term and<span class=\"_ _1a9\"> </span>conditions upon which the subscription rights w<span class=\"_ _4\"></span>ere granted<span class=\"_ _1a9\"> </span>excluding the impact of an<span class=\"_ _4\"></span>y non-market vesting conditions. A<span class=\"_ _4\"></span>t<span class=\"_ _1a9\"> </span>each balance sheet date<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the entity r<span class=\"_ _4\"></span>evises its estimates of the<span class=\"_ _1a9\"> </span>number of subscription rights that are expected to become<span class=\"_ _1a9\"> </span>exercisable except wher<span class=\"_ _4\"></span>e forfeiture is only due to shares not<span class=\"_ _1a9\"> </span>achieving the thresho<span class=\"_ _4\"></span>ld for vesting. It recognizes the impact<span class=\"_ _1a9\"> </span>of the revision of original estimates<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> if an<span class=\"_ _4\"></span>y<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> in the statement<span class=\"_ _1a9\"> </span>of profit and loss,<span class=\"_ _1\"></span> and a corresponding adjustment to equity<span class=\"_ _1a9\"> </span>over the r<span class=\"_ _4\"></span>emaining vesting period<span class=\"_ _4\"></span>. The pr<span class=\"_ _4\"></span>oceeds received<span class=\"_ _1\"></span>, net<span class=\"_ _1a9\"> </span>of any dir<span class=\"_ _4\"></span>ectly attributable tr<span class=\"_ _4\"></span>ansaction costs,<span class=\"_ _1\"></span> are credited to<span class=\"_ _1a9\"> </span>share capital (nominal value) and share pr<span class=\"_ _4\"></span>emium when the<span class=\"_ _1a9\"> </span>subscription rights are exercised<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForWarrantsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-112": {
   "value": "Trade receivables that do not contain a significant financing component are measured initially at the transaction price de- termined under IFRS 15. FINANCIAL ASSETS AT AMORTIZED COST This category is the most relevant to the Company. The  Company measures financial assets at amortized cost if both of the following conditions are met:  \u2022  The financial asset is held within a business model with  the objective to hold financial assets in order to collect  contractual cash flows; and  \u2022  The contractual terms of the financial asset give rise on  specified dates to cash flows that are solely payments of  principal and interest on the principal amount outstanding.  Financial assets at amortized cost are subsequently measured  using the effective interest rate (\u201cEIR\u201d) method and are subject  to impairment. Gains and losses are recognized in profit or  loss when the asset is derecognized, modified or impaired. The Company\u2019s financial assets at amortized cost mainly  includes trade receivables and term deposits I MPAIRMENT OF FINANCIAL ASSETS The Company recognizes an allowance for expected credit  losses (\u201cECLs\u201d) for all debt instruments not held at fair value  through profit or loss. ECLs are based on the difference  between the contractual cash flows due in accordance with  the contract and all the cash flows that the Company expects  to receive, discounted at an approximation of the original  effective interest rate. The expected cash flows will include  cash flows from the sale of collateral held or other credit en- hancements that are integral to the contractual terms . For trade receivables and term deposits, the Company applies a simplified approach in calculating ECLs. Therefore, the Company does not track changes in credit risk, but instead recognizes a loss allowance based on lifetime ECLs at each reporting date. Upon impairment, the carrying amount of the financial assets is directly reduced by the impairment loss, with the exception of trade receivables. For trade receivables, the carrying amount is reduced by means of a separate impairment account. If a trade receivable is considered uncollectible, it is written off in the impairment account. Subsequent collection of amounts that had previously been written off is credited in the impair- ment account. Modifications in the carrying amount of the impairment account are recognized in the statement of profit and loss. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForTradeAndOtherReceivablesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-61": {
   "value": "DERECOGNITION A financial asset (or, where applicable, a part of a financial asset or part of a group of similar financial assets) is primarily derecognized (i.e., removed from the Company\u2019s consolidated  statement of financial position) when:  \u2022  The rights to receive cash flows from the asset have  expired; or  \u2022  The Company has transferred its rights to receive cash  flows from the asset or has assumed an obligation to  pay the received cash flows in full without material delay  to a third party under a \u2018pass-through\u2019 arrangement and  either (a) the Company has transferred substantially all  the risks and rewards of the asset, or (b) the Company  has neither transferred nor retained substantially all the  risks and rewards of the asset but has transferred control  of the asset",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDerecognitionOfFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-62": {
   "value": "MPAIRMENT OF FINANCIAL ASSETS The Company recognizes an allowance for expected credit  losses (\u201cECLs\u201d) for all debt instruments not held at fair value  through profit or loss. ECLs are based on the difference  between the contractual cash flows due in accordance with  the contract and all the cash flows that the Company expects  to receive, discounted at an approximation of the original  effective interest rate. The expected cash flows will include  cash flows from the sale of collateral held or other credit en- hancements that are integral to the contractual terms . For trade receivables and term deposits, the Company applies a simplified approach in calculating ECLs. Therefore, the Company does not track changes in credit risk, but instead recognizes a loss allowance based on lifetime ECLs at each reporting date. Upon impairment, the carrying amount of the financial assets is directly reduced by the impairment loss, with the exception of trade receivables. For trade receivables, the carrying amount is reduced by means of a separate impairment account. If a trade receivable is considered uncollectible, it is written off in the impairment account. Subsequent collection of amounts that had previously been written off is credited in the impair- ment account. Modifications in the carrying amount of the impairment account are recognized in the statement of profit and loss. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForImpairmentOfFinancialAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-85": {
   "value": "INITIAL RECOGNITION AND MEASUREMENT Financial liabilities are classified, at initial recognition, at fair value through profit or loss, loans and borrowings, payables, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. All financial liabilities are recognized initially at fair value and, in the case of loans and borrowings and payables, net of directly attributable transaction costs. The Company\u2019s financial liabilities include trade and other payables and convertible loans. SUBSEQUENT MEASUREMENT For purposes of subsequent measurement, financial liabili- ties are classified in two categories: \u2022  Financial liabilities at fair value through profit or loss \u2022  Financial liabilities at amortized cost (loans and borrowings) Financial liabilities at fair value through profit and loss include financial liabilities designated upon initial recogni- tion as at fair value through profit or loss and only if the criteria in IFRS 9 are satisfied. The Group has designated convertible loans at fair value through profit and loss, since the convertible loans contain embedded derivatives for which assessment of whether it is required to separate the embedded derivative from the host contract to measure the derivative at fair value, would be more complex or result in less reliable measures than measuring the entire instrument at fair value through profit or loss As such the conditions in IFRS 9 4.3.5 are met and designation at fair value through profit or loss is permitted. The convertible loans are measured at fair value through profit or loss, using the valuation methods described in note 5.7.11. Transaction costs in relation to these financial liabilities at fair value through profit or loss are expensed as incurred and included in the line item \u2018Finance expense\u2019 in the consolidated statement of profit and los s. Trade and other payables are subsequently measured at amortized cost, using the effective interest rate metho d . Financial liabilities DISTINCTION BETWEEN FINANCIAL LIABILITIES AND EQUITY Financial liabilities and equity instruments issued by the Group are classified according to the substance of the contractual arrangements entered into and the definitions of a financial liability and an equity instrument. An equity instrument is any contract that evidences a residual interest in the assets of the Group after deducting all its liabilities. The accounting policies adopted for specific financial liabilities and equity instruments are set out below. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinancialLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-63": {
   "value": "effective hedge, as appropriate. All financial liabilities are recognized initially at fair value and, in the case of loans and borrowings and payables, net of directly attributable transaction costs. Trade and other payables are subsequently measured at amortized cost, using the effective interest rate metho d . ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForTradeAndOtherPayablesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-42": {
   "value": "The convertible loans are measured at fair value through  are set out below. profit or loss, using the valuation methods described in  note 5.7.11. Transaction costs in relation to these financial  liabilities at fair value through profit or loss are expensed as  incurred and included in the line item \u2018Finance expense\u2019 in  the consolidated statement of profit and los ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForBorrowingCostsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-64": {
   "value": "The convertible loans are measured at fair value through profit or loss, using the valuation methods described in note 5.7.11. Transaction costs in relation to these financial liabilities at fair value through profit or loss are expensed as incurred and included in the line item \u2018Finance expense\u2019 in the consolidated statement of profit and los s. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForBorrowingsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-16": {
   "value": "(O)  EQUITY INSTRUMENTS Equity instruments issued by the Group are recorded at the proceeds received. Direct issue costs are processed as a deduction on equity. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIssuedCapitalExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-65": {
   "value": "(P)  FINANCIAL INCOME AND EXPENSES Financial income includes interest income on invested funds. Realized and unrealized exchange differences are reported under financial income and expenses.  ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinanceIncomeAndCostsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-128": {
   "value": "(P)  FINANCIAL INCOME AND EXPENSES Financial income includes interest income on invested funds. Realized and unrealized exchange differences are reported under financial income and expenses. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForInterestIncomeAndExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-113": {
   "value": "(P)  FINANCIAL INCOME AND EXPENSES Financial income includes interest income on invested funds. Realized and unrealized exchange differences are reported under financial income and expenses",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinanceCostsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-66": {
   "value": "Q)  SEGMENT REPORTING An operational segment is a component of an entity: \u2022  which exercises operating activities with which profits are gained and costs can be made (including profits and costs from transactions with other components of the entity); \u2022  where the operational results are judged regularly by the highest managerial function of the entity who can take important operational decisions in order to make decisions regarding the granting of resources and to evaluate the financial results of the segment (chief operating decision maker); and \u2022  for which separate financial information is available and that is engaged either in providing specific products or services (business segment), or in providing products or services within a particular economic environment (geographical segment), and which is subject to risks and rewards that are different from those of other segments. The segment information is represented in a consistent manner regarding the internal reporting to the chief operating decision maker of the entity, i.e., the institu- tion which takes the most important decisions, enabling decision-making of allocating resources to the segment and evaluating financial performances of the segment. At this moment, reporting is being done at a global level within Oxurion.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForSegmentReportingExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-86": {
   "value": "( R)  INVENTORIES Raw and ancillary materials and commodities are stated at the lower of cost or net realizable value. The inventory costing system is based on the FIFO-method. Goods in process and finished goods are stated at the standard manufacturing cost or net realizable value. The inventory costing system is based on the FIFO-method. The net realizable value test is performed for each reporting period. Net realizable value is the estimated selling price in the ordinary course of business less the estimated costs of completion and the estimated costs necessary to make the sale. The standard manufacturing price of the goods in process and of the finished goods, includes (i) the acquisition value of the raw materials, (ii) consumables and ancillary materials, (iii) the production costs that are directly attrib- utable to the product, and (iv) the proportioned part of the production costs that are only indirectly attributable to the product, in so far that these costs cover the normal pro- duction period. The standard manufacturing price is compared to the actual manufacturing price on an annual basis, and adjust- ments are made to the value of the inventory. Impairment losses are calculated on the goods in-process, if their manufacturing cost, increased with the estimated amount of the costs to be incurred is higher than the net sales price at year-end Impairment losses on inventories are analyzed on a case- by-case basis if the net realizable value is lower than the cost. The calculation of the net realizable value takes into account the specific characteristics of the inventories, including the due date and if there are indications of a low rotation. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForMeasuringInventories",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-87": {
   "value": "As the net-assets of the Company are below 61,500 euro (the statutory minimum amount of share capital of a Belgian public limited liability company), in accordance with article 7:229 of the BCCA, each interested party is entitled to request the competent commercial court to dissolve the Company. In such instance the court may order the disso- lution of the Company or grant a grace period within which the Company is allowed to remedy the situation. Based on the above, the Board of Directors considers it may be reasonable to expect that there will be sufficient cash to continue its operations during the next twelve months, and therefore decided to continue its valuation rules under the assumption of going concern. However, there is a material uncertainty relating to going concern of the Group because it is uncertain that the above-men- tioned committed but conditional funding will be available when needed given the conditions related to the funding, and because it is not certain whether the Group will be able to timely obtain the necessary additional funding through debt, equity or non-dilutive funding, partnering or to realize sufficient cost and investment reductions. Convertible loans The Group has convertible loans with Negma and Kreos Capital / Pontifax Ventures. The convertible loans are measured at fair value through profit and loss. In deter- mining the fair value, the Group makes certain judgments on the valuation model to be applied and the probability that certain scenarios will occur or not in the future. The terms and conditions and further information is provided in note 5.7.11. Revenue from Contracts with Customers Under the five-step model established by the IFRS 15 standard, the Group\u2019s main estimates and assessments relate to identifying the performance obligations under its contracts and allocating the transaction price according to the stand- alone price of each of the performance obligations. 5.5.4  Main accounting estimates, assumptions and judgments Reporting the financial statements in accordance with IFRS requires management to rely on estimates, assumptions and judgments that impact the amounts reported under assets and liabilities, the notes on the latent assets and liabilities on the date of the financial statements, and the reported amounts of income and expenditure in the course of the reporting period. The actual results may differ from these estimates. The main assumptions relating to future developments and the main sources of uncertainty regarding estimates on the reporting date are set out below: Going Concern - material uncertainty The consolidated financial statements were prepared on a going concern basis. The Group\u2019s cash balance at December 31, 2022, of 3.6 million euro is not sufficient to fund the Group\u2019s operations during the next twelve months. However, post-closing, the Group entered into the Atlas Subscription Agreement. This committed but conditional funding would be sufficient to fund operations during the next twelve months from the financial statement\u2019s issue date. However, given the contin- gent nature of this funding, the Group is actively exploring the possibility of obtaining additional funding through debt, equity, or non-dilutive funding, including the licensing of THR-149, or alternatively reducing its costs and invest- ments so that there should be sufficient cash to continue its operations during the next twelve months. The majority of the Company\u2019s sources of revenue are derived from sales of JETREA\u00ae vials through our worldwide license agreement with Inceptua and the tripartite agreement with Eumedica. The Group has determined that there is only one performance obligation for all contracts in place with customers, that is to deliver the JETREA\u00ae product to the customer. Therefore, the transaction price is equal to the stand-alone selling price of each vial. STEP REVENUE FROM SALE OF VIALS Oxurion has a contract in place with Inceptua and Eumedica for 1. Identification of the contract the commercialization of JETREA\u00ae as disclosed in Note 5.8 under Key Agreements. 2. Identification of performance  In all distribution contracts, there is obligations only one performance obligation: supply of goods to a third party. 3. Identification of the transaction price Stand-alone price per vial is defined in each agreement with the customer. As there is only one performance 4. Allocation of the transaction price obligation, there is no allocation of the price, and therefore stand-alone price per vial is recognized. Revenue is recognized upon delivery to the customer. Returns are credited strictly at discretion of Oxurion, and 5. Revenue recognition a provision for US returns is made based on historical data. Rebate provisions for sales made outside the US, are made based on contractual agreements and/or local regulations. Share-based payment plans The Group defines the cost of share-based payment plans on the basis of the fair value of the equity instrument on the grant date. Determining the fair value involves choosing the most suitable valuation model for these equity instru- ments, and the characteristics of the equity instrument and its issue have a decisive impact. It also assumes the input in the valuation model of a number of relevant assump- tions, such as the estimated useful life of the right, volatility, etc. The assessments and the model are specified in more detail in note 5.7.8. Capitalization and impairment of intangible assets The Group accounts for as intangible assets only rights and intellectual property if acquired from third parties and costs of internal development only if the conditions for the recognition of intangible assets are met, otherwise such costs are included in the statement of profit and loss when they arise. The costs are capitalized only if the product is in Phase 3 and the chances of future success are estimated as highly probable. Accounting estimates and assess- ments of future business evolution, growth, sales, likelihood of success and discount rate are factors used in valuing the intangible asset to execute the annual impairment test. Taxes The Group considers that there is a considerable uncer- tainty regarding the future use of the tax losses of Oxurion as it is very difficult to estimate the impact of the patent deduction on the future tax result at this moment. As the Group can only use the abovementioned patent deduction on the basis of a tax ruling, the expectation exists that the future tax gains will be rather limited. There is also the un- certainty regarding the future use of the tax losses with ThromboGenic s ",
   "dimensions": {
    "concept": "ifrs-full:ExplanationOfAssumptionAboutFutureWithSignificantRiskOfResultingInMaterialAdjustments",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-100": {
   "value": "As the net-assets of the Company are below 61,500 euro (the statutory minimum amount of share capital of a Belgian public limited liability company), in accordance with article 7:229 of the BCCA, each interested party is entitled to request the competent commercial court to dissolve the Company. In such instance the court may order the disso- lution of the Company or grant a grace period within which the Company is allowed to remedy the situation. Based on the above, the Board of Directors considers it may be reasonable to expect that there will be sufficient cash to continue its operations during the next twelve months, and therefore decided to continue its valuation rules under the assumption of going concern. However, there is a material uncertainty relating to going concern of the Group because it is uncertain that the above-men- tioned committed but conditional funding will be available when needed given the conditions related to the funding, and because it is not certain whether the Group will be able to timely obtain the necessary additional funding through debt, equity or non-dilutive funding, partnering or to realize sufficient cost and investment reductions. Convertible loans The Group has convertible loans with Negma and Kreos Capital / Pontifax Ventures. The convertible loans are measured at fair value through profit and loss. In deter- mining the fair value, the Group makes certain judgments on the valuation model to be applied and the probability that certain scenarios will occur or not in the future. The terms and conditions and further information is provided in note 5.7.11. Revenue from Contracts with Customers Under the five-step model established by the IFRS 15 standard, the Group\u2019s main estimates and assessments relate to identifying the performance obligations under its contracts and allocating the transaction price according to the stand- alone price of each of the performance obligations. 5.5.4  Main accounting estimates, assumptions and judgments Reporting the financial statements in accordance with IFRS requires management to rely on estimates, assumptions and judgments that impact the amounts reported under assets and liabilities, the notes on the latent assets and liabilities on the date of the financial statements, and the reported amounts of income and expenditure in the course of the reporting period. The actual results may differ from these estimates. The main assumptions relating to future developments and the main sources of uncertainty regarding estimates on the reporting date are set out below: Going Concern - material uncertainty The consolidated financial statements were prepared on a going concern basis. The Group\u2019s cash balance at December 31, 2022, of 3.6 million euro is not sufficient to fund the Group\u2019s operations during the next twelve months. However, post-closing, the Group entered into the Atlas Subscription Agreement. This committed but conditional funding would be sufficient to fund operations during the next twelve months from the financial statement\u2019s issue date. However, given the contin- gent nature of this funding, the Group is actively exploring the possibility of obtaining additional funding through debt, equity, or non-dilutive funding, including the licensing of THR-149, or alternatively reducing its costs and invest- ments so that there should be sufficient cash to continue its operations during the next twelve months. The majority of the Company\u2019s sources of revenue are derived from sales of JETREA\u00ae vials through our worldwide license agreement with Inceptua and the tripartite agreement with Eumedica. The Group has determined that there is only one performance obligation for all contracts in place with customers, that is to deliver the JETREA\u00ae product to the customer. Therefore, the transaction price is equal to the stand-alone selling price of each vial. STEP REVENUE FROM SALE OF VIALS Oxurion has a contract in place with Inceptua and Eumedica for 1. Identification of the contract the commercialization of JETREA\u00ae as disclosed in Note 5.8 under Key Agreements. 2. Identification of performance  In all distribution contracts, there is obligations only one performance obligation: supply of goods to a third party. 3. Identification of the transaction price Stand-alone price per vial is defined in each agreement with the customer. As there is only one performance 4. Allocation of the transaction price obligation, there is no allocation of the price, and therefore stand-alone price per vial is recognized. Revenue is recognized upon delivery to the customer. Returns are credited strictly at discretion of Oxurion, and 5. Revenue recognition a provision for US returns is made based on historical data. Rebate provisions for sales made outside the US, are made based on contractual agreements and/or local regulations. Share-based payment plans The Group defines the cost of share-based payment plans on the basis of the fair value of the equity instrument on the grant date. Determining the fair value involves choosing the most suitable valuation model for these equity instru- ments, and the characteristics of the equity instrument and its issue have a decisive impact. It also assumes the input in the valuation model of a number of relevant assump- tions, such as the estimated useful life of the right, volatility, etc. The assessments and the model are specified in more detail in note 5.7.8. Capitalization and impairment of intangible assets The Group accounts for as intangible assets only rights and intellectual property if acquired from third parties and costs of internal development only if the conditions for the recognition of intangible assets are met, otherwise such costs are included in the statement of profit and loss when they arise. The costs are capitalized only if the product is in Phase 3 and the chances of future success are estimated as highly probable. Accounting estimates and assess- ments of future business evolution, growth, sales, likelihood of success and discount rate are factors used in valuing the intangible asset to execute the annual impairment test. Taxes The Group considers that there is a considerable uncer- tainty regarding the future use of the tax losses of Oxurion as it is very difficult to estimate the impact of the patent deduction on the future tax result at this moment. As the Group can only use the abovementioned patent deduction on the basis of a tax ruling, the expectation exists that the future tax gains will be rather limited. There is also the un- certainty regarding the future use of the tax losses with ThromboGenic ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAssetsAndLiabilitiesWithSignificantRiskOfMaterialAdjustmentExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-114": {
   "value": "Convertible loans The Group has convertible loans with Negma and Kreos Capital / Pontifax Ventures. The convertible loans are measured at fair value through profit and loss. In deter- mining the fair value, the Group makes certain judgments on the valuation model to be applied and the probability that certain scenarios will occur or not in the future. The terms and conditions and further information is provided in note 5.7.11. 5.7.11  Convertible loans The convertible loans include the following: IN '000 EURO KREOS / NEGMA TOTAL PONTIFAX 31 December 2020 0 0 0 Proceeds from loans and borrowings 10,000 2,50012,500 Commitment fee 0 525 525 Converted into capital 0 -1,350-1,350 Fair value adjustment 25 134 159 31 December 2021 10,025 1,80911,834 Proceeds from loans and borrowings 0 7,150 7,150 Commitment fee 0 700 700 Converted into capital 0 -9,025-9,025 Repayment of loans and borro- wings -3,605 0-3,605 Fair value adjustment -436 426 -10 31 December 2022 5,984 1,060 7,044 Of which current 2,749 1,060 3,809 Of which non-current 3,235 0 3,235 The Company issued convertible bonds since 2021 with two parties as described below: Negma Group Ltd. On August 26, 2021, Oxurion (the Company or the Issuer) entered into an agreement whereby Negma as investor is willing to subscribe to, up to 12,000 zero coupon au- tomatically convertible bonds with each a nominal value of 2,500 euro, in several tranches of minimum 200 and  bonds\u201d) through several Tranches (\u201cPart B Commitment\u201d),  maximum 1,000 bonds for a total committed amount up  to be called by the Issuer at its discretion over the period  to 30 million euro. The Company as issuer controls the  between September 2, 2022 up to December 31, 2022  timing and amount of the tranche calls. (\u201cPart B Commitment Period\u201d). The Investor is entitled to a commitment fee for an  The initial terms and conditions as set forth in the Issuance  amount equal to up to 3.5% of the total commitment, i.e., and Subscription Agreement remain unchanged for Part  up to 1.050 million euro, payable, at the option of the Issuer, A of the Funding Program. Part A of the Funding Program  either in cash or in commitment fee convertible bonds.  was suspended during the Part B Commitment Period.  50% of the commitment fee is due upon signing of the  Upon expiry of the Part B Commitment Period, Part A  agreement, the remaining 50% is due only if a tranche call  of the Funding Program was automatically reactivated  is exercised by the Issuer, as a result of which in total half of  (including that part of the Part B Commitment for which  the commitment will have been called by the Issuer. no Part B Convertible bonds shall have been issued and  subscribed to during the Part B Commitment Period). The conversion price is 92% of the lowest closing vol- ume-weighted average price (VWAP) over a period of  For the Part B Commitment, the Investor is entitled to a  15 consecutive trading days expiring on the trading day  further waiver and commitment fee equal to 0,7 million  immediately preceding the date of issuance of a con- euro, payable in 280 convertible bonds for the Part B  version notice. Each convertible bond and commitment  Commitment together with the first tranche of the Part B  fee convertible bond has a duration of twelve months as  Commitment .The waiver and commitment fee convert- from its date of issuance and shall accrue no interest. Any  ible bonds have a nominal value of 0,0025 million euro  convertible bond and commitment fee convertible bond  each. not converted into shares prior to the maturity date, shall  convert automatically into shares at maturity date. The  The conversion price of the Part B convertible bonds is  Investor has the right to convert all or any of the convert- 80% of the lowest closing volume-weighted average  ible bonds and commitment fee convertible bonds into  price (VWAP) over a period of 15 consecutive trading  new shares at any time.  days expiring on the trading day immediately preceding  the date of issuance of a conversion notice.  There is no  The number of shares to be issued upon conversion shall  liquidity condition or cool down period. be equal to the conversion amount divided by the appli- cable conversion price, provided that it shall not exceed  The number of shares to be issued upon conversion shall  a maximum of 38,291,950 shares. If the Investor does  be equal to the conversion amount divided by the appli- not receive the relevant shares, the Issuer shall pay to the  cable conversion price. The cap of 38,291,950 shares is  Investor an amount in cash (\u201cPart A of Funding Program\u201d) deleted from the terms and conditions of the agreement.  On September 2, 2022, the parties amended the terms  The convertible bonds described above meets the defini- and conditions of part of the funding program (\u201cPart B\u201d)  tion of a financial liability given that the conversion price  for an amount of up to 6 million euro of the total com- is not fixed and upon conversion, will result in a variable  mitment through the issuance and subscription of up  number of shares being issued, being the nominal amount  to 2.400 of the convertible bonds (\u201cPart B Convertible  of the convertible loan divided by the conversion price. The convertible bond is also a derivative financial liability as the conversion feature is an embedded derivative of the loan host. The host and the derivative will not be separated and are accounted for as one hybrid financial liability. The financial liability is measured at fair value through profit or loss. The initial fair value of the convertible loan equals an amount of cash received in the amount of  9.650 million euro of which 2.5 million euro was received in 2021 and 7.150 million euro was received in 2022 (5 million euro Part A and 4.650 million euro Part B). A total of 1.350 million euro was already converted into shares before December 31, 2021. During 2022 another 9.025 million euro has been converted into shares before December 31, 2022, following the conversion of (in aggregate) 3.610 convertible bonds that were issued. Subsequently, the fair value of the convertible loan related to the Part A convertible bonds as per December 31, 2021, is determined as the nominal amount of the convertible loan plus 8%. The 8% represents the difference between the share price and the 92% of the lowest closing VWAP. Given the volatility of the share prices as per year ending December 31, 2022, the fair value of the convertible loan related to the Part B Convertible bonds is based on the intrinsic value approach. Considering the term of the convertible loan to be less than twelve months, no option pricing model is used. The outstanding convertible loan has a nominal value of 0.5 million euro as per 31 December 2022 and the fair value is determined at 1.06 million euro with changes in the fair value recorded in profit and loss as fair value gains and losses on the convertible loan. The fair value loss in the amount of 0.426 million euro as per December 31, 2022, is included in the line item \u2018Finance expense\u2019 in the consolidated statement of profit and loss. The fair value of the converted bonds during 2022 was 16.423 million euro. The difference between the fair value and the nominal amount was recorded in profit and loss as fair value loss included in the line finance expense for an amount of 7.824 million euro and 0.426 million euro in other reserves upon conversion. Upon conversion, the financial liability measured at fair value at date of conversion will be reclassified to share- holders\u2019 equity. The liability for the first instalment of the Part A commit- ment fee of 0.525 million euro (50% upon signing of the agreement) is made once the first Tranche Call is called by the Company. The commitment fee is recorded in profit and loss as transaction cost due, given the Company cannot avoid cash settlement if the Investor requests eventual payment in cash. These transaction costs are included in the line item \u2018Finance expense\u2019 in the consoli- dated statement of profit and loss. The second instalment of the Part A commitment fee of 0.525 million euro is recognized if and only if a tranche call is exercised by the Issuer, as a result of which in total more than half of the total commitment will have been called. This commitment fee is considered as a transaction cost in accordance with IFRS 9 and expensed as incurred as financial expense, given it is an incremental cost that the Company would not incur if the triggering condition is not met. This second instalment has not been accounted for as per December 31, 2022, since there is no present obligation yet. The Part B waiver and commitment fee of 0.7 million euro payable in 280 convertible bonds with a nominal value of 0.0025 million euro became due upon the payment of the first tranche under Part B pursuant to the addendum and is recorded as financial expense in the consolidated statement of profit and loss given these are considered as transactions costs. The corresponding liability is measured  2.  The conversion price may be adjusted from time to  at fair value through profit and loss. Upon conversion the  time upon the occurrence of corporate actions, such  financial liability measured at fair value at the date of con- as merger, demerger, stock splits or reverse stock split, version, will be reclassified to shareholders equity.  in accordance with the adjustment policy set out in the  Euronext Corporate Action Policy Kreos Capital / Pontifax Ventures 3.  In the event that, between the issue date of the Kreos  Bonds and the date falling twelve months after the  On November 21, 2021, Oxurion (the Company or the  Loan Facility (i.e. 22 November 2022, the Company  Issuer) entered into the Loan Facility whereby Kreos  issued any shares in the context of an equity financing  Capital VI Limited together with Pontifax Medison  at an issue price per share which represents a  Finance L.P. (the Investors) as investors are willing to  discount of more than 20% to the VWAP (volume- subscribe to convertible bonds with each a nominal value  weighted average price) over the thirty trading days  of 0.1 million euro, in an amount of 10.0 million euro.  period preceding the date of such issuance of shares, The Investors are entitled to a transaction fee of 0.125  the Kreos Conversion Price shall be adjusted to 140%  million euro and an end of loan payment equal to 3.5%  of the average issue price of all shares issued by the  that shall accrue on the amount drawn under each tranche.  Company in the context of any equity financing since  The convertible bonds accrue interest in the amount of  the issue date of the Kreos Bonds (if lower than the  7.95% per year.  Kreos Conversion Price). As a result, the strike price  was reset at 0.28 euro per share. The convertible bonds may be either: On June 21, 2022, the Company, Kreos Capital VI  1.  Converted in shares at the option of the Investors at  Limited and Pontifax Medison Finance L.P. executed an  any time. amendment to the convertible bond facility, pursuant  2.  Converted in shares at the option of the Issuer when  to which a repayment of 3.0 million euro (30%) of the  certain conditions are met. principal amount (excluding capitalized interest) of the  3.  Repaid based on the amortization schedule without  first tranche of 10.0 million euro was made. As part of the  extension. amendment, it was agreed that the cash covenant would  4.  Repaid based on the amortization schedule with  be reduced from 4.0 million euro to 3.0 million euro, the  extension. repayment schedule was revised and the interest only  5.  Prepaid when certain conditions are met. period was extended to September 30, 2022. At the same  6.  Paid in full in case of events of default or change in  time, Kreos/Pontifax agreed not exercise any rights they  control. might have had to recover amounts owed to them under  the Loan Agreement provided that certain conditions are  The number of shares to be issued upon conversion shall  met, the fulfilment of which is uncertain. be equal to the conversion amount divided by the applica- ble conversion price: The convertible bond described above meets the definition  of a financial liability given that the Company cannot avoid  1.  The initial conversion price of the Bonds was equal to  delivering cash to the investors and the conversion price  2.90 euro. is not fixed. The Company cannot avoid delivering cash as  they do not have control over the different scenarios. The  conversion price can also change upon certain scenario\u2019s as described above and as such the number of shares being issued will vary based on the conversion price. The convertible bond is also a derivative financial liability as the conversion feature is an embedded derivative of the loan host. The host and the derivative will not be separated. The financial liability is measured at fair value through profit or loss. In determining the fair value, the company makes certain judgements on the valuation model to be applied and the probability that certain scenarios will occur or not in the future. The fair value of the convertible bonds has been measured considering the following scenarios that may impact the term of the bond: 1.  No extension 2.  With extension 3.  Prepaid when certain conditions are met. 4.  Paid in full in case of events of default or change in control. The initial fair value of the convertible loan equals the amount of cash received which is 10.0 million euro as per December 31, 2021. Subsequently the fair value is de- termined as the probability weighted average of the fair values of the different scenarios described above consid- ering the pre-payment agreed on June 21, 2022. The fair value of the scenarios has been determined by application of the effective interest rate method and the Black-Scholes model. The payment by the Company to Pontifax Medison Finance L.P is paid in USD by converting the relevant due amount in euro into the USD at a fixed exchange rate. For Pontifax, the fair value of the convertible loan is deter- mined based on the application of the effective interest rate method considering the USD loan payment at the spot rate at valuation date. The above fair value measurement is a level 3 as a result of the unobservable input for the probabilities. A reason- able change of the probabilities between the different sce- nario\u2019s would not lead to a material change in the fair value. The fair value as per December 31, 2022, is determined at 5.984 million euro, taking into account the repayment of 3 million euro, with changes in the fair value recorded in profit and loss as fair value gains and losses on the con- vertible loan. The fair value gain in the amount of 0.436 million euro as per December 31, 2022, are included in the line item \u2018Finance income\u2019 in the consolidated statement of profit and loss. No amounts have already been converted into shares as per December 31, 2022. Upon conversion, the financial liability measured at fair value at date of conversion will be reclassified to share- holders\u2019 equity, being share capital and share premium and other reserves for the fair value adjustment portion. The Loan Facility is subject to a financial covenant whereby the Group is required to maintain at all times a minimum aggregate amount of cash in the bank of an amount equal to the lower of 3 million euro and the principal amount outstanding. The Group has complied with the financial covenant at December 31, 202 2 . ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBorrowingsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-88": {
   "value": "5.5.5<span class=\"_ _4\"></span>.1  <span class=\"_ _109\"> </span>Product sales information<span class=\"_ _1a9\"> </span>Product sales relate only to JETREA\u00ae and ar<span class=\"_ _4\"></span>e reported in<span class=\"_ _1a9\"> </span>note 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.1.<span class=\"_ _1a9\"> </span>5.5.5<span class=\"_ _4\"></span>.2 <span class=\"_ _7a\"> </span>Geogr<span class=\"_ _4\"></span>aphic information<span class=\"_ _1a9\"> </span>The Global R&amp;D<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> Clinical Operations and most of the<span class=\"_ _1a9\"> </span>General and Administr<span class=\"_ _4\"></span>ative functions are located in<span class=\"_ _1a9\"> </span>Leuven,<span class=\"_ _4\"></span> Belgium. T<span class=\"_ _4\"></span>hese operations repr<span class=\"_ _4\"></span>esent approxi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mately 95% of the operating r<span class=\"_ _4\"></span>esult. In the context of the<span class=\"_ _1a9\"> </span>Company\u2019<span class=\"_ _1\"></span>s business<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> these activities do not lead to the<span class=\"_ _1a9\"> </span>need for geographic information.<span class=\"_ _1a9\"> </span>100% of intangible assets and almost all non-curr<span class=\"_ _4\"></span>ent<span class=\"_ _1a9\"> </span>assets are located in Belgium.<span class=\"_ _1a9\"> </span>5.5.5<span class=\"_ _4\"></span>.3 <span class=\"_ _10a\"> </span>Business unit reporting<span class=\"_ _1a9\"> </span>Oxurion is a biotechnology company with focus on<span class=\"_ _1a9\"> </span>diseases related to the retina.<span class=\"_ _1a9\"> </span>Our molecules,<span class=\"_ _1\"></span> ocriplasmin on the market with brand<span class=\"_ _1a9\"> </span>name JETREA\u00ae,<span class=\"_ _4\"></span> the plasma kallikr<span class=\"_ _4\"></span>ein inhibitor in a Phase<span class=\"_ _1a9\"> </span>2 clinical trial and the pan-RGD integrin inhibitor which is<span class=\"_ _1a9\"> </span>currently on ho<span class=\"_ _4\"></span>ld<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> represent more than 95% of the income<span class=\"_ _1a9\"> </span>and expenses of the Company<span class=\"_ _25\"></span>. As a consequence,<span class=\"_ _1\"></span> the<span class=\"_ _1a9\"> </span>consolidated statement of profit and loss and of financial<span class=\"_ _1a9\"> </span>position are a valid repr<span class=\"_ _4\"></span>esentation of its business unit as a<span class=\"_ _1a9\"> </span>whole<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.5.5<span class=\"_ _4\"></span>.4 <span class=\"_ _10a\"> </span>Information about major customers<span class=\"_ _1a9\"> </span>Oxurion has one customer that individually accounts for<span class=\"_ _1a9\"> </span>more than 7<span class=\"_ _25\"></span>4% of the total income at the end of 2022<span class=\"_ _1a9\"> </span>(2021: 73%)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEntitysReportableSegmentsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-67": {
   "value": "5.5.6  Financial instruments The Company has the following financial instruments measured at amortized cost: trade receivables, cash and cash equivalents, investments, trade payables, lease liabili- ties and other short term liabilities. As of December 31, 2022, the majority of cash and cash equivalents are cash at banks available on demand. Besides these financial instruments, the Company also issued convertible bonds measured at fair value through profit and los since 2021 with two parties as described in note 5.7.11. Financial assets and financial liabilities are included in the Group\u2019s statement of financial position when the Group becomes a party to the contractual provisions of the instrument. Fair Values There is no significant difference between the fair value and carrying amount of the Group\u2019s cash and cash equiv- alents, investments, trade and other receivables, other current assets, trade payables and other current liabilities. The carrying amount of cash and cash equivalents and investments is equal to their fair value, given the short- term maturity of these financial instruments. Similarly, the carrying amounts of receivables and payables, which are all subject to normal trade credit terms, are equivalent to their fair values. Investments in bonds are measured at fair value based on quoted market prices. The fair value movements are recorded in OCI. The class A Negma convertible loan is measured at fair value as the nominal amount of the convertible loan plus 8%, which is the difference between the share price and the 92% of the lowest closing VWAP (8%) (level 1). The class B Negma convertible loan is measured at fair value as the nominal amount of the convertible loan plus 20%, which is the difference between the share prices and 80% of the closing VWAP (20%) (level 1). The Kreos Capital / Pontifax Ventures convertible loan is measured at fair value whereby fair value is estimated considering probabilities of the occurrence of different scenarios. The probabilities are estimated by the Group and consist level 3 fair value assessments. A reasonable change of the probabilities between the different scenario\u2019s would not lead to a material change in the fair value 5.7.6   Investments IN '000 EURO (AS AT 31 DECEMBER) 2022 2021 Other investments 95 247 Total investments 95 247 FINANCE ASSETS ACCORDING TO CATEGORIES INVESTMENTS AT INVESTMENTS DEFINED IN IFRS 9 AMORTIZED COST AT FVOCI Balance at 1 January 2021 0 288 Exchange rate differences 0 7 Additions 0 0 Retirements 0 -40 Impairments 0 -1 Appreciation at market value 0 -7 Balance at 31 December 2021 0 247 -/- of which taken in fixed assets - - Taken in current assets 0 247 Composition - Other bonds 0 247 - Term investments 0 0 Breakdown per currency - in euro 0 140 - in other currency 0 107 Total 0 247 Balance at 1 January 2022 0 247 Exchange rate differences 0 9 Additions 0 0 Retirements 0 -152 Impairments 0 -4 Appreciation at market value 0 -5 Balance at 31 December 2022 0 95 -/- of which taken in fixed assets - - Taken in current assets 0 95 Composition - Other bonds 0 95 - Term investments 0 0 Breakdown per currency - in euro 0 95 - in other currency 0 0 Total 0 95 The Group decided to invest mainly in saving accounts and term deposits. The remaining bonds are held by KBC and are distributed in two bonds of private and public insti- tutions. The credit rating varies from A+ to BBB. Bonds are measured at fair value at level 1 hierarchy based on quoted market prices ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFairValueOfFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-101": {
   "value": "5.5.6  Financial instruments The Company has the following financial instruments measured at amortized cost: trade receivables, cash and cash equivalents, investments, trade payables, lease liabili- ties and other short term liabilities. As of December 31, 2022, the majority of cash and cash equivalents are cash at banks available on demand. Besides these financial instruments, the Company also issued convertible bonds measured at fair value through profit and los since 2021 with two parties as described in note 5.7.11. Financial assets and financial liabilities are included in the Group\u2019s statement of financial position when the Group becomes a party to the contractual provisions of the instrument. Fair Values There is no significant difference between the fair value and carrying amount of the Group\u2019s cash and cash equiv- alents, investments, trade and other receivables, other current assets, trade payables and other current liabilities. The carrying amount of cash and cash equivalents and investments is equal to their fair value, given the short- term maturity of these financial instruments. Similarly, the carrying amounts of receivables and payables, which are all subject to normal trade credit terms, are equivalent to their fair values. Investments in bonds are measured at fair value based on quoted market prices. The fair value movements are recorded in OCI. The class A Negma convertible loan is measured at fair value as the nominal amount of the convertible loan plus 8%, which is the difference between the share price and the 92% of the lowest closing VWAP (8%) (level 1). The 5.7.6   Investments IN '000 EURO (AS AT 31 DECEMBER) 2022 2021 Other investments 95 247 Total investments 95 247 FINANCE ASSETS ACCORDING TO CATEGORIES INVESTMENTS AT INVESTMENTS DEFINED IN IFRS 9 AMORTIZED COST AT FVOCI Balance at 1 January 2021 0 288 Exchange rate differences 0 7 Additions 0 0 Retirements 0 -40 Impairments 0 -1 Appreciation at market value 0 -7 Balance at 31 December 2021 0 247 -/- of which taken in fixed assets - - Taken in current assets 0 247 Composition - Other bonds 0 247 - Term investments 0 0 Breakdown per currency - in euro 0 140 - in other currency 0 107 Total 0 247 Balance at 1 January 2022 0 247 Exchange rate differences 0 9 Additions 0 0 Retirements 0 -152 Impairments 0 -4 Appreciation at market value 0 -5 Balance at 31 December 2022 0 95 -/- of which taken in fixed assets - - Taken in current assets 0 95 Composition - Other bonds 0 95 - Term investments 0 0 Breakdown per currency - in euro 0 95 - in other currency 0 0 Total 0 95 The Group decided to invest mainly in saving accounts and term deposits. The remaining bonds are held by KBC and are distributed in two bonds of private and public insti- tutions. The credit rating varies from A+ to BBB. Bonds are measured at fair value at level 1 hierarchy based on quoted market prices . ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFairValueMeasurementExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-134": {
   "value": "5.5.6<span class=\"_ _3\"></span> <span class=\"_ _59\"> </span><span class=\"ls11 ws27\">Financial inst<span class=\"_ _4\"></span>ruments<span class=\"_ _1a9\"> </span></span>The Compan<span class=\"_ _4\"></span>y has the following financial instr<span class=\"_ _4\"></span>uments<span class=\"_ _1a9\"> </span>measured at amortized cost: trade receivables<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> cash and<span class=\"_ _1a9\"> </span>cash equivalents,<span class=\"_ _1\"></span> investments,<span class=\"_ _4\"></span> trade payab<span class=\"_ _4\"></span>les,<span class=\"_ _1\"></span> lease liabili<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ties and other short term liabilities.<span class=\"_ _1a9\"> </span>As of December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> the majority of cash and cash<span class=\"_ _1a9\"> </span>equivalents are cash at banks availab<span class=\"_ _4\"></span>le on demand<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Besides these financial instruments,<span class=\"_ _1\"></span> the Company also<span class=\"_ _1a9\"> </span>issued convertible bonds measured at fair value through<span class=\"_ _1a9\"> </span>profit and los since 2021 with two parties as described in<span class=\"_ _1a9\"> </span>note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.11<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>inancial assets and financial liabilities are included in the<span class=\"_ _1a9\"> </span>Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s statement of financial position when the Group<span class=\"_ _1a9\"> </span>becomes a party to the contractual provisions of the<span class=\"_ _1a9\"> </span>instrument.<span class=\"_ _1a9\"> </span>F<span class=\"_ _1\"></span>air V<span class=\"_ _4\"></span>alues<span class=\"_ _1a9\"> </span>There is no significant diff<span class=\"_ _4\"></span>erence between <span class=\"_ _4\"></span>the fair value<span class=\"_ _1a9\"> </span>and carr<span class=\"_ _3\"></span>ying amount of the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _4\"></span>s cash and cash equiv<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>alents,<span class=\"_ _1\"></span> investments,<span class=\"_ _4\"></span> trade and other r<span class=\"_ _4\"></span>eceivables<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> other<span class=\"_ _1a9\"> </span>current assets<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> trade payab<span class=\"_ _4\"></span>les and other current liabilities<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The carrying amount of cash and cash equivalents and<span class=\"_ _1a9\"> </span>investments is equal to their fair value<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> given the shor<span class=\"_ _3\"></span>t-<span class=\"_ _1a9\"> </span>term maturity of these financial instruments<span class=\"_ _4\"></span>. Similarly<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> the<span class=\"_ _1a9\"> </span>carr<span class=\"_ _3\"></span>ying amounts of receivables and payab<span class=\"_ _4\"></span>les,<span class=\"_ _1\"></span> which are<span class=\"_ _1a9\"> </span>all subject to normal trade credit terms<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> ar<span class=\"_ _4\"></span>e equivalent to<span class=\"_ _1a9\"> </span>their fair values<span class=\"_ _4\"></span>. Investments in bonds are measur<span class=\"_ _4\"></span>ed at<span class=\"_ _1a9\"> </span>fair value based on quoted market prices<span class=\"_ _4\"></span>. The fair value<span class=\"_ _1a9\"> </span>movements ar<span class=\"_ _4\"></span>e recorded in OCI<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The class A Negma con<span class=\"_ _4\"></span>vertible loan is measured at fair<span class=\"_ _1a9\"> </span>value as the nominal amount of the convertible loan plus<span class=\"_ _1a9\"> </span>8%,<span class=\"_ _4\"></span> which is the diff<span class=\"_ _4\"></span>erence betw<span class=\"_ _4\"></span>een the share price and<span class=\"_ _1a9\"> </span>the 92% of the low<span class=\"_ _4\"></span>est closing VW<span class=\"_ _25\"></span>AP (8%) (level 1)<span class=\"_ _4\"></span>. The<span class=\"_ _1a9\"> </span>class B Negma convertible loan is measured at f<span class=\"_ _4\"></span>air value as the nominal amount of the convertible loan plus 20%,<span class=\"_ _1\"></span> which is the differ<span class=\"_ _4\"></span>ence between the share prices and 80% of the closing VW<span class=\"_ _25\"></span>AP (20%) (level 1).<span class=\"_ _1a9\"> </span>The Kreos Capital / P<span class=\"_ _4\"></span>ontifax V<span class=\"_ _1\"></span>entures convertible loan is measured at fair value wher<span class=\"_ _4\"></span>eby fair value is estimated considering probabilities of the occurrence of diff<span class=\"_ _4\"></span>erent scenarios. T<span class=\"_ _4\"></span>he probabilities are estimated b<span class=\"_ _4\"></span>y the Group and consist level 3 fair value assessments<span class=\"_ _4\"></span>. A reasonable change of the probabilities betw<span class=\"_ _4\"></span>een the different scenario<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s would not lead to a material c<span class=\"_ _4\"></span>hange in the fair value<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>5.5.7<span class=\"_ _3\"></span> <span class=\"_ _5e\"> </span><span class=\"ls11 ws27\">Financial ri<span class=\"_ _4\"></span>sk manag<span class=\"_ _4\"></span>ement<span class=\"_ _1a9\"> </span></span>The financial department of the parent Company coor<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>dinates access to the national and international financial markets and considers and manages the financial risks relating to the activities of the Group<span class=\"_ _1\"></span>. The financial risks related to the operating activities of the Gr<span class=\"_ _4\"></span>oup are confined to a minimal currency exc<span class=\"_ _4\"></span>hange rate risk. Ther<span class=\"_ _4\"></span>e are no risks worth mentioning,<span class=\"_ _4\"></span> such as liquidity risks or interest rate risks as the Group has no debts with variab<span class=\"_ _4\"></span>le interest rates<span class=\"_ _4\"></span>. The Group does not b<span class=\"_ _4\"></span>uy or trade in financial instru<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments for speculative purposes<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>(A) <span class=\"_ _41\"> </span>CAPIT<span class=\"_ _25\"></span>AL MANA<span class=\"_ _4\"></span>GEMENT<span class=\"_ _1a9\"> </span>The Group manages its capital with the aim of ensuring that the Group can continue to operate<span class=\"_ _4\"></span>. At the same time,<span class=\"_ _1\"></span> the Group wishes to generate a return for its stake<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>holders via the results of its r<span class=\"_ _4\"></span>esearch activities<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> which in turn are expected to lead to an increase in the value of the Company\u2019<span class=\"_ _1\"></span>s shares<span class=\"_ _4\"></span>. This str<span class=\"_ _4\"></span>ateg<span class=\"_ _3\"></span>y has not changed compared to previous y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The capital structur<span class=\"_ _4\"></span>e of the Group consists of investments,<span class=\"_ _1\"></span> cash,<span class=\"_ _4\"></span> cash equivalents and restricted cash,<span class=\"_ _1\"></span> and equity at<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tributable to the equity ho<span class=\"_ _4\"></span>lders of the Company<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> inc<span class=\"_ _4\"></span>luding capital,<span class=\"_ _4\"></span> reserves and results carried over<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> as indicated in notes 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.7<span class=\"_ _4\"></span> and 5<span class=\"_ _1\"></span>.7<span class=\"_ _25\"></span>.8 respectively<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>The Group manages its capital structur<span class=\"_ _4\"></span>e and makes the necessar<span class=\"_ _3\"></span>y adjustments in light of changes in economic circumstances,<span class=\"_ _1\"></span> the risk characteristics of the underlying assets and the projected cash requir<span class=\"_ _4\"></span>ements of current researc<span class=\"_ _4\"></span>h activities. When assessing the capital structur<span class=\"_ _4\"></span>e<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the current cash position and projected cash b<span class=\"_ _4\"></span>urn are used as the key parameters<span class=\"_ _4\"></span>. Cash burn is defined as the net result corr<span class=\"_ _4\"></span>ected for depreciation and amortization,<span class=\"_ _4\"></span> stock<span class=\"_ _1\"></span>-<span class=\"_ _1a9\"> </span>based compensation,<span class=\"_ _4\"></span> and less investments in fixed assets<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The Group wishes to maintain a capital structur<span class=\"_ _4\"></span>e that is sufficient to fund researc<span class=\"_ _4\"></span>h activities during a period of at least twelve months<span class=\"_ _4\"></span>. Any cash infl<span class=\"_ _4\"></span>ows from possib<span class=\"_ _4\"></span>le coop<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>eration agreements or other cash gener<span class=\"_ _4\"></span>ating activities are not taken into account. T<span class=\"_ _25\"></span>o maintain the capital structure,<span class=\"_ _1\"></span> the Group can issue new shares or conc<span class=\"_ _4\"></span>lude new (B) <span class=\"_ _56\"> </span>MAIN A<span class=\"_ _4\"></span>CCOUNTING PRINCIPLES<span class=\"_ _1a9\"> </span>Details of the main accounting principles and methods,<span class=\"_ _1\"></span> including the inclusion criteria,<span class=\"_ _1\"></span> the valuation basis,<span class=\"_ _4\"></span> and the basis on which income and costs are r<span class=\"_ _4\"></span>ecognized<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> for each categor<span class=\"_ _3\"></span>y of financial assets,<span class=\"_ _4\"></span> liabilities<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and equity instru<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ments,<span class=\"_ _1\"></span> are explained under 5<span class=\"_ _1\"></span>.5<span class=\"_ _4\"></span>.3<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>(C) <span class=\"_ _35\"> </span>CA<span class=\"_ _25\"></span>TEGORIES OF FINANCIAL INS<span class=\"_ _4\"></span>TRUMENTS<span class=\"_ _1a9\"> </span>The financial instruments curr<span class=\"_ _4\"></span>ently held by the Compan<span class=\"_ _4\"></span>y are:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>T<span class=\"_ _1\"></span>rade receivables and payab<span class=\"_ _4\"></span>les<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Shor<span class=\"_ _3\"></span>t-term financial liabilities<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws108\">Cash, cash equivalents and in<span class=\"_ _4\"></span>vestments (we r<span class=\"_ _4\"></span>efer to </span>note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.6) amounting to 3<span class=\"_ _1\"></span>.6 million euro (2021: 10<span class=\"_ _1\"></span>.0 million euro)<span class=\"_ _4\"></span>. In<span class=\"_ _4\"></span>vestments are mainly in very low risk bonds and term investments<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span>Conver<span class=\"_ _3\"></span>tible bonds (we r<span class=\"_ _4\"></span>efer to note 5<span class=\"_ _1\"></span>.5<span class=\"_ _4\"></span>.6<span class=\"_ _1a9\"> </span>(D) <span class=\"_ _41\"> </span>MARKET RISK<span class=\"_ _1a9\"> </span>The Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s activities are such that the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s income is<span class=\"_ _1a9\"> </span>exposed to financial risks arising from currency exc<span class=\"_ _4\"></span>hange<span class=\"_ _1a9\"> </span>rate fluctuations because a substantial proportion of<span class=\"_ _1a9\"> </span>the researc<span class=\"_ _4\"></span>h expenditure is invoiced in USD and pound<span class=\"_ _1a9\"> </span>sterling (GBP)<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he Group tries to compensate the inflo<span class=\"_ _4\"></span>ws<span class=\"_ _1a9\"> </span>and outflows in f<span class=\"_ _4\"></span>oreign currenc<span class=\"_ _1a9\"> </span>y<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>Analysis of sensitivity to exchange r<span class=\"_ _4\"></span>ates<span class=\"_ _1a9\"> </span>The Group is mainly exposed to fluctuations in GBP and<span class=\"_ _1a9\"> </span>USD against the euro<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The sensitivity of loss to changes in the exc<span class=\"_ _4\"></span>hange rates<span class=\"_ _1a9\"> </span>arises mainly from USD and GBP denominated financial<span class=\"_ _1a9\"> </span>instruments<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span><table class=\"s w1b4 h4d\" id=\"_dd1e7635-0d12-4b2b-a1ff-eab6487d2add\"><tr><td class=\"c n x129 y5d7 w1b5 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">N '000 EURO<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x297 y5d7 w1b6 h41\" colspan=\"2\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IMP<span class=\"_ _1\"></span>ACT ON P<span class=\"_ _4\"></span>AS<span class=\"_ _4\"></span>T T<span class=\"_ _1\"></span>AX LOSS<span class=\"_ _1a9\"> </span></div></td></tr><tr><td></td><td class=\"c n x298 y5d8 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x299 y5d8 w1b7 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y5d9 ff2 fsd fc7 sc0 ls0 ws0\">USD/euro exchange rate increase 10%<span class=\"_ _1a9\"> </span></td><td class=\"c n x29a y5da wad h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">163<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x29b y5da w1b8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-339<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y5db ff2 fsd fc7 sc0 ls0 ws0\">USD/euro exchange rate decrease 10%<span class=\"_ _1a9\"> </span></td><td class=\"c n x29c y5dc w1b9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-200<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x29d y5dc w1ba h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls4d ws252\">41<span class=\"_ _3\"></span>5<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y5dd ff2 fsd fc7 sc0 ls0 ws0\">GBP/euro exchange rate increase 10%<span class=\"_ _1a9\"> </span></td><td class=\"c n x29e y518 w1bb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x29f y518 w1bc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">6<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y5de ff2 fsd fc7 sc0 ls0 ws0\">GBP/euro exchange rate decrease 10%<span class=\"_ _1a9\"> </span></td><td class=\"c n x2a0 y515 w150 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-9<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a1 y515 w14d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-<span class=\"_ _1a9\"> </span>7<span class=\"_ _1a9\"> </span></div></td></tr></table>(E) <span class=\"_ _74\"> </span>INTERES<span class=\"_ _4\"></span>T RISK MANA<span class=\"_ _4\"></span>GEMENT<span class=\"_ _1a9\"> </span>At the moment,<span class=\"_ _1\"></span> the Group has external debt financing<span class=\"_ _1a9\"> </span>with a fixed interest rate<span class=\"_ _4\"></span>. The Gr<span class=\"_ _4\"></span>oup does not have an<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span>contracts with a variable inter<span class=\"_ _4\"></span>est rate<span class=\"_ _4\"></span>. Consequently<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> there<span class=\"_ _1a9\"> </span>is currently no need f<span class=\"_ _4\"></span>or a specific interest risk manage<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ment policy in the Group<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>(F) <span class=\"_ _74\"> </span>CREDIT RISK MANA<span class=\"_ _4\"></span>GEMENT<span class=\"_ _1a9\"> </span>Credit risk relates to the risk that a counterparty will fail to<span class=\"_ _1a9\"> </span>fulfil their contractual ob<span class=\"_ _4\"></span>ligations with the result that the<span class=\"_ _1a9\"> </span>Group would suff<span class=\"_ _4\"></span>er a loss. T<span class=\"_ _4\"></span>he Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s policy focuses on<span class=\"_ _1a9\"> </span>only working with cr<span class=\"_ _4\"></span>edit-worthy counterparties and<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> where<span class=\"_ _1a9\"> </span>necessar<span class=\"_ _3\"></span>y<span class=\"_ _25\"></span>, r<span class=\"_ _4\"></span>equiring adequate securities. Inf<span class=\"_ _4\"></span>ormation about<span class=\"_ _1a9\"> </span>the creditw<span class=\"_ _4\"></span>orthiness of counterpar<span class=\"_ _3\"></span>ties is provided by inde<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>pendent ratings agencies and<span class=\"_ _1\"></span>, if this is not a<span class=\"_ _4\"></span>vailable<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the<span class=\"_ _1a9\"> </span>Group uses information that is pub<span class=\"_ _4\"></span>licly availab<span class=\"_ _4\"></span>le as well<span class=\"_ _1a9\"> </span>as its own internal r<span class=\"_ _4\"></span>ecords. Cr<span class=\"_ _4\"></span>edit risk is managed by the<span class=\"_ _1a9\"> </span>financial department of Oxurion by means of individual<span class=\"_ _1a9\"> </span>follo<span class=\"_ _4\"></span>w-up of credit per counterparty<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The Group has a limited number of customer<span class=\"_ _4\"></span>s. Cr<span class=\"_ _4\"></span>edit<span class=\"_ _1a9\"> </span>risk is considered as remote due to a history of no issues<span class=\"_ _1a9\"> </span>with payment collection. So far<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the collection of payments<span class=\"_ _1a9\"> </span>happened without any delay and with limited cr<span class=\"_ _4\"></span>edit risk.<span class=\"_ _1a9\"> </span>The credit risk on cash in<span class=\"_ _4\"></span>vestments is limited given that the<span class=\"_ _1a9\"> </span>counterparties are banks with high credit scores attributed<span class=\"_ _1a9\"> </span>by international r<span class=\"_ _4\"></span>ating agencies<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>(G) <span class=\"_ _35\"> </span>LIQUIDITY RISK MANA<span class=\"_ _1\"></span>GEMENT<span class=\"_ _1a9\"> </span>The Group manages its liquidity risk b<span class=\"_ _4\"></span>y ensuring adequate reser<span class=\"_ _3\"></span>ves and by constantly c<span class=\"_ _4\"></span>hecking the projected and actual cash flows<span class=\"_ _4\"></span>. A<span class=\"_ _4\"></span>t the moment,<span class=\"_ _4\"></span> the Group is not subject to any substantial liquidity risk.<span class=\"_ _1a9\"> </span>Contractual undiscounted maturities of financial liabilities at December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021 and 2022 are as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span><table class=\"s w1bd h4e\" id=\"_b7fa71f0-875d-4b8e-9040-198dc456c426\"><tr><td class=\"t m1 x12d h12 y5df ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T<span class=\"_ _3\"></span> <span class=\"ls0\"> </span></td><td class=\"c n x2a2 y5e0 w1be h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">LESS THAN 6 MONTHS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a3 y5e0 w1bf h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">6 - 12 MONTHS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a4 y5e0 w1c0 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">BETWEEN 1 AND 2 YEARS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a5 y5e0 w1c1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">BETWEEN 2 AND 5 YEARS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a6 y5e0 w1c2 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">OVER 5 YEARS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a7 y5e0 w1c3 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m1 x12d h12 y5e1 ff3 fsb fc7 sc0 ls1b ws0\">31 DECEMBER 2021)<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y5e2 wfd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Lease liabilities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a8 y5e2 w3b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">162<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x219 y5e2 w4a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">59<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2a9 y5e2 w1c4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">30<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2aa y5e2 w1c5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">15<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ab y5e2 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ac y5e2 w1c6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">266<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5e3 w103 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Convertible loans<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ad y5e3 w1c7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">300<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ae y5e3 w1c8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,910<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2af y5e3 w1c9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,464<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b0 y5e3 w1ca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">5<span class=\"_ _4\"></span>,187<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b1 y5e3 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b2 y5e3 wca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">11<span class=\"_ _4\"></span>,861<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5e4 w108 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>rade payables<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b3 y5e4 w1cb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,979<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b4 y5e4 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b5 y5e4 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b6 y5e4 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b7 y5e4 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b8 y5e4 w1cc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,979<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5e5 w10d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other short-term liabilities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2b9 y5e5 w1cd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">628<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ba y5e5 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2bb y5e5 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2bc y5e5 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2bd y5e5 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2be y5e5 w1cd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">628<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5e6 w1ce h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal financial liabilities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2bf y5e6 w1cf h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">6<span class=\"_ _1\"></span>,069<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c0 y5e6 w1d0 h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">1,969<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c1 y5e6 w1d1 h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">4,494<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c2 y5e6 w1d2 h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">5,202<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c3 y5e6 w1d3 h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2c4 y5e6 w1d4 h4f\"><div class=\"t m2 xca h1f y593 ff3 fsc fc7 sc0 ls0 ws0\">17<span class=\"_ _1\"></span>,734<span class=\"_ _1a9\"> </span></div></td></tr></table><div class=\"t m1 h12 ff3 fsb fc7 sc0 ls1b ws0 gs13b\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T<span class=\"_ _3\"></span> <span class=\"ls0\"> </span></div><div class=\"t m1 h12 ff3 fsb fc7 sc0 ls1b ws0 gs13c\">31 DECEMBER 2022)<span class=\"_ _1a9\"> </span></div><div class=\"t m1 h12 ff3 fsb fc7 sc0 ls1b ws0 gs13d\">LESS THAN 6 MONTHS<span class=\"_ _100\"> </span>6 - 12 MONTHS<span class=\"_ _1e\"> </span>BETWEEN 1 AND 2 YEARS<span class=\"_ _1d\"> </span>BETWEEN 2 AND 5 YEARS<span class=\"_ _2b\"> </span>OVER 5 YEARS<span class=\"_ _17\"> </span><span class=\"ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _1a9\"> </span></span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs13e\">Lease liabilities<span class=\"_ _14\"> </span>88<span class=\"_ _fc\"> </span>78<span class=\"_ _57\"> </span>144<span class=\"_ _114\"> </span>389<span class=\"_ _114\"> </span>394<span class=\"_ _116\"> </span>1<span class=\"_ _4\"></span>,093<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs13f\">Convertible loans<span class=\"_ _117\"> </span>1<span class=\"_ _4\"></span>,728<span class=\"_ _111\"> </span>1,728<span class=\"_ _6f\"> </span>3<span class=\"_ _4\"></span>,456<span class=\"_ _57\"> </span><span class=\"ls4d ws252\">5<span class=\"_ _23\"></span>41<span class=\"_ _85\"> </span></span>0<span class=\"_ _116\"> </span>7<span class=\"_ _1\"></span>,453<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs140\">T<span class=\"_ _1\"></span>rade payables<span class=\"_ _118\"> </span>5<span class=\"_ _4\"></span>,040<span class=\"_ _85\"> </span>0<span class=\"_ _112\"> </span>0<span class=\"_ _85\"> </span>0<span class=\"_ _112\"> </span>0<span class=\"_ _6f\"> </span>5<span class=\"_ _4\"></span>,040<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs141\">Other short-term liabilities<span class=\"_ _10f\"> </span>2,813<span class=\"_ _85\"> </span>0<span class=\"_ _112\"> </span>0<span class=\"_ _85\"> </span>0<span class=\"_ _85\"> </span>0<span class=\"_ _116\"> </span>2,813<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h1f ff3 fsc fc7 sc0 ls0 ws0 gs142\">T<span class=\"_ _1\"></span>otal financial liabilities<span class=\"_ _10d\"> </span>9<span class=\"_ _1\"></span>,669<span class=\"_ _6f\"> </span>1,806<span class=\"_ _29\"> </span>3<span class=\"_ _4\"></span>,600<span class=\"_ _17\"> </span>930<span class=\"_ _10d\"> </span>394<span class=\"_ _88\"> </span>16<span class=\"_ _1\"></span>,399<span class=\"_ _1a9\"> </span></div><div class=\"t m0 hd ff3 fs8 fc4 sc0 ls38 ws1a1 gs191\">5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _27\"></span>4<span class=\"_ _2f\"></span> <span class=\"_ _159\"> </span><span class=\"ls0 ws0\">T<span class=\"_ _25\"></span>rade and oth<span class=\"_ _4\"></span>er recei<span class=\"_ _4\"></span>vabl<span class=\"_ _4\"></span>es, non-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m0 hd ff3 fs8 fc4 sc0 ls0 ws0 gs192\">curr<span class=\"_ _4\"></span>ent tax c<span class=\"_ _4\"></span>redit and c<span class=\"_ _4\"></span>urren<span class=\"_ _4\"></span>t </div><div class=\"t m0 hd ff3 fs8 fc4 sc0 ls12 ws32 gs193\">tax receivabl<span class=\"_ _4\"></span>es </div><div class=\"t m1 h17 ff8 fs9 fc7 sc0 ls0 ws0 gs194\">5.7<span class=\"_ _25\"></span>.4.1 <span class=\"_ _7f\"> </span>T<span class=\"_ _1\"></span>rade and other receivables<span class=\"_ _1a9\"> </span></div><div class=\"gs195\"><table class=\"s w318 h58\" id=\"_b803bed3-43f1-4a5e-b699-6a545be9b69c\"><tr><td class=\"c n xf0 y607 w319 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x121 y607 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x448 y607 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w31a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>rade receivables<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x449 y56a w31b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">316<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44a y56a w31c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">81<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w31d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other receivables<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44b y56b w31e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,696<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44c y56b w31f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,276<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w320 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Prepaid expenses and other current assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44d y5ba w321 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">309<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44e y5ba w322 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">160<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44f y515 w323 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,321<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x450 y515 w324 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">2,517<span class=\"_ _1a9\"> </span></div></td></tr></table></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsc6 gs196\">Other receivables r<span class=\"_ _4\"></span>elate mainly to prepayments: 2.376 </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws172 gs197\">million euro in 2022,<span class=\"_ _1\"></span> compared to 2.228 million euro in </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws23 gs198\">2021<span class=\"_ _4\"></span>. These ad<span class=\"_ _4\"></span>vances wer<span class=\"_ _4\"></span>e paid upfront to various CRO </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws80 gs199\">partners mainly in relation to direct costs and pass-through </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs19a\">costs.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa1 gs19b\">Allow<span class=\"_ _4\"></span>ance for bad debt is booked on the basis of an </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws88 gs19c\">estimate of lifetime credit losses at eac<span class=\"_ _4\"></span>h reporting, taking </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wse8 gs19d\">into account the payment histor<span class=\"_ _3\"></span>y of the other par<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>. As per </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws13d gs19e\">December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> and 2021<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> there are no material aged </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs19f\">trade receivab<span class=\"_ _4\"></span>les.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf9 gs1a0\">The table belo<span class=\"_ _4\"></span>w sho<span class=\"_ _4\"></span>ws the evolution of key trade r<span class=\"_ _4\"></span>eceiv<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs1a1\">able amounts on the reporting date:<span class=\"_ _1a9\"> </span></div><div class=\"t m1 h12 ff3 fsb fc7 sc0 ls1b ws0 gs1a2\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _8\"> </span><span class=\"wsbe\">2022<span class=\"_ _36\"> </span>2021<span class=\"_ _1a9\"> </span></span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs1a3\">Eumedica<span class=\"_ _15f\"> </span>90<span class=\"_ _16\"> </span>25<span class=\"_ _1a9\"> </span></div><div class=\"t m2 h13 ff1 fsc fc7 sc0 ls0 ws0 gs1a4\">Inceptua Group<span class=\"_ _131\"> </span>85<span class=\"_ _3f\"> </span>56<span class=\"_ _1a9\"> </span></div>VIB<span class=\"_ _160\"> </span>119<span class=\"_ _7b\"> </span>0<span class=\"_ _1a9\"> </span>Other trade receivables<span class=\"_ _20\"> </span>22<span class=\"_ _7b\"> </span>0<span class=\"_ _1a9\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _161\"> </span><span class=\"ls41 ws225\">316<span class=\"_ _105\"> </span></span>81<span class=\"_ _1a9\"> </span>Management has sufficient confidence in the creditw<span class=\"_ _4\"></span>orthi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ness of the counterparty that the trade receivable amounts are considered co<span class=\"_ _4\"></span>llectable in full. Aging balance of receivab<span class=\"_ _4\"></span>les that are due<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> but that ar<span class=\"_ _4\"></span>e still considered collectab<span class=\"_ _4\"></span>le based on contractual payment terms:<span class=\"_ _1a9\"> </span><table class=\"s w325 h61\" id=\"_16ca18ee-3aaa-45a6-abe2-9842177a1c5c\"><tr><td class=\"c n xf0 y68a w60 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x451 y68a w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x452 y68a w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y68b w326 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0 - 60 days<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x453 y68b w31b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">316<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x454 y68b w67 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">81<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y68c w327 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">60 - 90 days<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x455 y68c w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x456 y68c w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y68d ff1 fsc fc7 sc0 ls0 ws0\">90 - 120 days<span class=\"_ _1a9\"> </span></td><td class=\"c n x457 y68e w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x458 y68e w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y68f w328 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">more than 120 days<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x459 y68f w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45a y68f w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45b y515 w329 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls41 ws225\">316<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45c y515 w32a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">81<span class=\"_ _1a9\"> </span></div></td></tr></table>When determining the collectability of a trade r<span class=\"_ _4\"></span>eceivable<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the Group takes into account any c<span class=\"_ _4\"></span>hange in the quality of the receivable betw<span class=\"_ _4\"></span>een the date on which the cr<span class=\"_ _4\"></span>edit was granted and the reporting date.<span class=\"_ _1a9\"> </span>The Group has no securities linked to these r<span class=\"_ _4\"></span>eceivables<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.7<span class=\"_ _25\"></span>.4.2 <span class=\"_ _5e\"> </span>T<span class=\"_ _1\"></span>axes<span class=\"_ _1a9\"> </span>Non-current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _1a9\"> </span><table class=\"s w32b h55\" id=\"_169d7040-5c5b-4c96-89d4-013e133d7d7e\"><tr><td class=\"c n xf0 y5fc w60 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45d y5fc w32c h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45e y5fc w1b7 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w32d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax credit<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45f y5ba w32e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3,785<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x460 y5ba w32f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,000<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x461 y515 w330 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,785<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x462 y515 w331 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">4,000<span class=\"_ _1a9\"> </span></div></td></tr></table>Oxurion receives tax credits f<span class=\"_ _4\"></span>or R&amp;D expenses. In case in<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>sufficient tax against which to set off the tax credit,<span class=\"_ _1\"></span> the credit can be carried for<span class=\"_ _3\"></span>ward during five consecutive fiscal y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>. At the end of these five fiscal y<span class=\"_ _4\"></span>ears,<span class=\"_ _1\"></span> the balance of the unused tax credit is r<span class=\"_ _4\"></span>eceived in cash from the government.<span class=\"_ _1a9\"> </span>Current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _1a9\"> </span><table class=\"s w332 h62\" id=\"_dbad26ad-1a41-4f7b-b8d9-6d8a87218443\"><tr><td class=\"c n xf0 y690 w319 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x451 y690 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x463 y690 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y691 w333 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Recoverable V<span class=\"_ _1\"></span>A<span class=\"_ _1\"></span>T<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x464 y691 w334 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">154<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x465 y691 w335 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">24<span class=\"_ _3\"></span>2<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f9 w336 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Recoverable withho<span class=\"_ _4\"></span>lding tax<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x466 y5f9 w337 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x467 y5f9 w338 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y692 w339 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax credit<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x468 y692 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x469 y692 w92 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">568<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w33a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other taxes<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46a y5ba w33b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">33<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46b y5ba w33c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">31<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46c y515 w33d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">189<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46d y515 w33e h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">845<span class=\"_ _1a9\"> </span></div></td></tr></table>The outstanding tax claims r<span class=\"_ _4\"></span>elate to reco<span class=\"_ _4\"></span>verable V<span class=\"_ _25\"></span>A<span class=\"_ _25\"></span>T<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> re<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cover<span class=\"_ _4\"></span>able withholding tax on interest,<span class=\"_ _1\"></span> US corporate income tax and short-term tax credit<span class=\"_ _1a9\"> </span>5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _27\"></span>6<span class=\"_ _2f\"> </span> <span class=\"_ _14f\"> </span><span class=\"ls17 ws92\">Inves<span class=\"_ _3\"></span>tment<span class=\"_ _3\"></span>s<span class=\"_ _1a9\"> </span></span><table class=\"s w344 h55\" id=\"_6b0a05b8-8a4f-496e-a83f-ce76badc8de6\"><tr><td class=\"c n xf0 y5fc w60 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x472 y5fc w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x473 y5fc w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w345 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other investments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x474 y5ba w4a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">95<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x475 y5ba w346 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">24<span class=\"_ _3\"></span>7<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w347 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal investments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x476 y515 w253 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">95<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x477 y515 w348 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls15 ws5b\">24<span class=\"_ _3\"></span>7<span class=\"_ _1a9\"> </span></div></td></tr></table><table class=\"s w349 h64\" id=\"_5c500f8c-3ad8-4068-bfd5-4f88828511bf\"><tr><td class=\"t m1 x12d h12 y697 ff3 fsb fc7 sc0 ls1b ws0\">FINANCE ASSETS ACCORDING T<span class=\"_ _4\"></span>O CA<span class=\"_ _1\"></span>TEGORIES </td><td class=\"t m1 x478 h12 y697 ff3 fsb fc7 sc0 ls1b ws0\">INVESTMENTS A<span class=\"_ _1\"></span>T </td><td class=\"t m1 x479 h12 y697 ff3 fsb fc7 sc0 ls1b wsbe\">INVESTMENTS </td></tr><tr><td class=\"t m1 x12d h12 y698 ff3 fsb fc7 sc0 ls1b ws0\">DEFINED IN IFRS 9<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x3a2 h12 y698 ff3 fsb fc7 sc0 ls1b ws0\">AMORTIZED COS<span class=\"_ _4\"></span>T<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x47a h12 y698 ff3 fsb fc7 sc0 ls1b ws0\">A<span class=\"_ _1\"></span>T FVOCI<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y699 w34a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">Balance at 1 January 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x47b y699 w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x47c y699 w34b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">288<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y69a w34c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Exchange rate differences<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x47d y69a w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x47e y69a w297 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y69b w2c2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Additions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x47f y69b w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x480 y69b wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y69c w34d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Retirements<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x481 y69c w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x482 y69c w14e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-40<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y69d w34e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Impairments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x483 y69d w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x484 y69d w34f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y69e w350 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Appreciation at market value<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x485 y69e w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x486 y69e w351 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-7<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y69f w352 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">Balance at 31 December 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x487 y69f w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x488 y69f w348 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls15 ws5b\">24<span class=\"_ _3\"></span>7<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6a0 w353 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-/- of which taken in fixed assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x489 y6a0 w354 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48a y6a0 w354 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6a1 w355 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>aken in current assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48b y6a1 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48c y6a1 w356 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">247<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y6a2 ff2 fsd fc7 sc0 ls0 ws0\">Composition<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y6a3 w357 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- Other bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48d y6a3 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48e y6a3 w356 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">247<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6a4 w358 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- T<span class=\"_ _1\"></span>erm investments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48f y6a4 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x490 y6a4 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y6a5 ff2 fsd fc7 sc0 ls0 ws0\">Breakdown per curr<span class=\"_ _4\"></span>ency<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y6a6 w359 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- in euro<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x491 y6a6 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x492 y6a6 w35a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">140<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6a7 w35b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- in other currency<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x493 y6a7 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x494 y6a7 w35c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">107<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6a8 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x495 y6a8 w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x496 y6a8 w348 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls15 ws5b\">24<span class=\"_ _3\"></span>7<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6a9 w35d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">Balance at 1 January 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x497 y6a9 w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x498 y6a9 w348 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls15 ws5b\">24<span class=\"_ _3\"></span>7<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6aa w34c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Exchange rate differences<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x47d y6aa w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x499 y6aa w13e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">9<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6ab w2c2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Additions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x47f y6ab w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x480 y6ab wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6ac w34d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Retirements<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x481 y6ac w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x49a y6ac w2c6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-152<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6ad w34e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Impairments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x483 y6ad w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x49b y6ad w35e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-4<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6ae w350 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Appreciation at market value<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x485 y6ae w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x49c y6ae wb0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6af w35f h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">Balance at 31 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x49d y6af w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x49e y6af w253 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">95<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y6b0 ff1 fsc fc7 sc0 ls0 ws0\">-/- of which taken in fixed assets<span class=\"_ _1a9\"> </span></td><td class=\"c n x49f y6b1 w360 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a0 y6b1 w360 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f1 w355 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>aken in current assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48b y5f1 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a1 y5f1 w4a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">95<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y6b2 ff2 fsd fc7 sc0 ls0 ws0\">Composition<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y5f3 w357 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- Other bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48d y5f3 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a2 y5f3 w4a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">95<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y569 w358 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- T<span class=\"_ _1\"></span>erm investments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x48f y569 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x490 y569 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y6b3 ff2 fsd fc7 sc0 ls0 ws0\">Breakdown per curr<span class=\"_ _4\"></span>ency<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y56b w359 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- in euro<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x491 y56b w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a3 y56b w4a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">95<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w35b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">- in other currency<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x493 y5ba w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a4 y5ba w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x495 y515 w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a5 y515 w253 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">95<span class=\"_ _1a9\"> </span></div></td></tr></table>The Group decided to in<span class=\"_ _4\"></span>vest mainly in saving accounts and term deposits. T<span class=\"_ _4\"></span>he remaining bonds are held b<span class=\"_ _4\"></span>y KBC and are distributed in tw<span class=\"_ _4\"></span>o bonds of private and public insti<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tutions. T<span class=\"_ _4\"></span>he credit rating varies fr<span class=\"_ _4\"></span>om A+ to BBB<span class=\"_ _4\"></span>. Bonds are measured at fair value at level 1 hier<span class=\"_ _4\"></span>arch<span class=\"_ _4\"></span>y based on quoted market prices<span class=\"_ _1a9\"> </span>5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _5\"></span>1<span class=\"_ _27\"></span>1<span class=\"_ _2f\"></span> <span class=\"_ _69\"> </span><span class=\"ls18 ws95\">Conver<span class=\"_ _3\"></span>tible loans<span class=\"_ _1a9\"> </span></span>The convertible loans include the f<span class=\"_ _4\"></span>ollowing:<span class=\"_ _1a9\"> </span><table class=\"s w414 h71\" id=\"_54b2a5ea-7bdc-4f2c-8657-e14a1438199a\"><tr><td class=\"t m1 x34d h12 y77b ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x5c3 h12 y77c ff3 fsb fc7 sc0 ls1b ws0\">KREOS / </td><td class=\"c n x5c4 y77d w415 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">NEGMA<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5c5 y77d w416 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls3a ws221\">TOTAL<span class=\"_ _1a9\"> </span></div></td></tr><tr><td></td><td class=\"t m1 x524 h12 y77e ff3 fsb fc7 sc0 ls1b wsbe\">PONTIF<span class=\"_ _1\"></span>AX<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y77f w364 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2020<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5c6 y77f w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5c7 y77f w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5c8 y77f w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c xf0 y780 w417 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Proceeds from loans and<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">borrowings<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5c9 y781 w418 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">10<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ca y781 w419 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,500</div></td><td class=\"t m0 x5cb h14 y782 ff2 fsd fc7 sc0 ls0 ws0\">12,500<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y783 w41a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Commitment fee<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5cc y783 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5cd y783 w41b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">525<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x582 h14 y784 ff2 fsd fc7 sc0 ls0 ws0\">525<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y785 w41c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Converted into capital<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ce y785 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5cf y785 w161 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,350</div></td><td class=\"t m0 x3ea h14 y786 ff2 fsd fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,350<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y787 w41d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>air value adjustment<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d0 y787 w24b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">25<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d1 y787 w41e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">134<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58a h14 y788 ff2 fsd fc7 sc0 ls0 ws0\">159<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y789 w41f h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">31 December 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d2 y789 w420 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">10<span class=\"_ _1\"></span>,025<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d3 y789 w421 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">1,809</div></td><td class=\"t m0 x3ea h14 y78a ff2 fsd fc7 sc0 ls0 ws0\">11<span class=\"_ _4\"></span>,834<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c xf0 y78b w417 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Proceeds from loans and<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">borrowings<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d4 y78c wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d5 y78c w148 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,150<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x591 h14 y78d ff2 fsd fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,150<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y78e w41a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Commitment fee<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5cc y78e wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5cd y78e w92 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">700<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x582 h14 y78f ff2 fsd fc7 sc0 ls0 ws0\">700<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y790 w41c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Converted into capital<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ce y790 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d6 y790 w422 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-9<span class=\"_ _1\"></span>,025</div></td><td class=\"t m0 x5cb h14 y791 ff2 fsd fc7 sc0 ls0 ws0\">-9<span class=\"_ _1\"></span>,025<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c xf0 y792 w423 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Repayment of loans and borro-<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">wings<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d7 y793 w424 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3<span class=\"_ _4\"></span>,605<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d8 y793 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0</div></td><td class=\"t m0 x5cb h14 y794 ff2 fsd fc7 sc0 ls0 ws0\">-3<span class=\"_ _4\"></span>,605<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y795 w41d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>air value adjustment<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5d9 y795 w425 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-436<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5da y795 w426 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">426<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x5a6 h14 y796 ff2 fsd fc7 sc0 ls0 ws0\">-10<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y797 w427 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">31 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5db y797 w428 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">5<span class=\"_ _4\"></span>,984<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d3 y797 w429 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">1,060<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x3ef h14 y798 ff2 fsd fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,044<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y799 w117 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Of which current<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5dc y799 w42a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,7<span class=\"_ _1\"></span>49<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5dd y799 w42b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,060<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x3ef h28 y79a ff1 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,809<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y535 w42c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Of which non-current<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5de y535 w105 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3,235<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5df y535 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x3ef h28 y79b ff1 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,235<span class=\"_ _1a9\"> </span></td></tr></table>The Compan<span class=\"_ _4\"></span>y issued convertible bonds since 2021 with two parties as described below:<span class=\"_ _1a9\"> </span>Negma Group Ltd<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On August 26<span class=\"_ _25\"></span>, 2021<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion (the Company or the Issuer) entered into an agreement wher<span class=\"_ _4\"></span>eby Negma as in<span class=\"_ _4\"></span>vestor is willing to subscribe to<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> up to 12,000 zero coupon au<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tomatically convertible bonds with each a nominal value<span class=\"_ _1a9\"> </span>of 2,500 euro<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> in several tranches of minimum 200 and<span class=\"_ _1a9\"> </span> bonds<span class=\"_ _4\"></span>\u201d<span class=\"ff1 ws11e\">) through several T<span class=\"_ _25\"></span>ranches<span class=\"ff2 ws0\"> <span class=\"_ _1\"></span><span class=\"ff1\">(<span class=\"ff3 ws103\">\u201cP<span class=\"_ _4\"></span>art B Commitment\u201d<span class=\"ff1 ls1f ws25\">),<span class=\"_ _1a9\"> </span></span></span></span></span></span><span class=\"ff1 ws11e\"><span class=\"ff2 ws0\"><span class=\"ff1\"><span class=\"ff3 ws103\"><span class=\"ff1 ls1f ws25\"> </span></span></span></span></span>maximum 1<span class=\"_ _4\"></span>,000 bonds for a total committed amount up<span class=\"_ _1a9\"> </span> to be called by the Issuer at its discr<span class=\"_ _4\"></span>etion over the period<span class=\"_ _1a9\"> </span> to 30 million euro<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he Company as issuer contro<span class=\"_ _4\"></span>ls the<span class=\"_ _1a9\"> </span> between September 2,<span class=\"_ _1\"></span> 2022 up to December 31<span class=\"_ _1\"></span>, 2022<span class=\"_ _1a9\"> </span> timing and amount of the tranche calls<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>(<span class=\"ff3\">\u201cPart B Commitment Period<span class=\"_ _1\"></span>\u201d<span class=\"ff1 ls1f ws25\">).<span class=\"_ _1a9\"> </span></span></span>The Investor is entitled to a commitment f<span class=\"_ _4\"></span>ee for an<span class=\"_ _1a9\"> </span> The initial terms and conditions as set forth in the Issuance<span class=\"_ _1a9\"> </span> amount equal to up to 3<span class=\"_ _1\"></span>.5% of the total commitment,<span class=\"_ _4\"></span> i.e.,<span class=\"_ _1\"></span> and Subscription Agreement remain unc<span class=\"_ _4\"></span>hanged for P<span class=\"_ _4\"></span>art<span class=\"_ _1a9\"> </span> up to 1<span class=\"_ _4\"></span>.050 million euro<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> payable<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> at the option of the Issuer<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> A of the F<span class=\"_ _1\"></span>unding Program. Part A of the F<span class=\"_ _4\"></span>unding Progr<span class=\"_ _4\"></span>am<span class=\"_ _1a9\"> </span> either in cash or in commitment fee convertible bonds<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> was suspended during the P<span class=\"_ _4\"></span>art B Commitment Period<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span> 50% of the commitment fee is due upon signing of the<span class=\"_ _1a9\"> </span> Upon expir<span class=\"_ _3\"></span>y of the Part B Commitment Period<span class=\"_ _1\"></span>, P<span class=\"_ _4\"></span>art A<span class=\"_ _1a9\"> </span> agreement,<span class=\"_ _1\"></span> the remaining 50% is due only if a tranche call<span class=\"_ _1a9\"> </span> of the F<span class=\"_ _1\"></span>unding Program was automatically r<span class=\"_ _4\"></span>eactivated<span class=\"_ _1a9\"> </span> is exercised by the Issuer<span class=\"_ _25\"></span>, as a r<span class=\"_ _4\"></span>esult of which in total half of<span class=\"_ _1a9\"> </span> (including that part of the Part B Commitment for which<span class=\"_ _1a9\"> </span> the commitment will have been called b<span class=\"_ _4\"></span>y the Issuer<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>no Part B Convertible bonds shall have been issued and<span class=\"_ _1a9\"> </span> subscribed to during the Part B Commitment Period)<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The conver<span class=\"_ _4\"></span>sion price is 92% of the low<span class=\"_ _4\"></span>est closing vol<span class=\"_ _4\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ume-weighted a<span class=\"_ _4\"></span>verage price (VW<span class=\"_ _25\"></span>AP) over a period of<span class=\"_ _1a9\"> </span> F<span class=\"_ _1\"></span>or the Part B Commitment,<span class=\"_ _4\"></span> the Investor is entitled to a<span class=\"_ _1a9\"> </span> 15 consecutive trading days expiring on the tr<span class=\"_ _4\"></span>ading day<span class=\"_ _1a9\"> </span> further waiver and commitment fee equal to 0<span class=\"_ _1\"></span>,7<span class=\"_ _4\"></span> million<span class=\"_ _1a9\"> </span> immediately preceding the date of issuance of a con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>euro<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> payable in 280 convertible bonds for the Part B<span class=\"_ _1a9\"> </span> version notice<span class=\"_ _4\"></span>. Each convertible bond and commitment<span class=\"_ _1a9\"> </span> Commitment together with the first tranc<span class=\"_ _4\"></span>he of the Part B<span class=\"_ _1a9\"> </span> fee convertible bond has a duration of tw<span class=\"_ _4\"></span>elve months as<span class=\"_ _1a9\"> </span> Commitment .The w<span class=\"_ _4\"></span>aiver and commitment fee convert<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>from its date of issuance and shall accrue no interest. An<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span> ible bonds have a nominal value of 0<span class=\"_ _25\"></span>,0025 million euro<span class=\"_ _1a9\"> </span> convertible bond and commitment fee convertible bond<span class=\"_ _1a9\"> </span> each.<span class=\"_ _1a9\"> </span>not converted into shares prior to the maturity date<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> shall<span class=\"_ _1a9\"> </span> convert automatically into shares at maturity date<span class=\"_ _4\"></span>. The<span class=\"_ _1a9\"> </span> The conver<span class=\"_ _4\"></span>sion price of the Part B convertible bonds is<span class=\"_ _1a9\"> </span> Investor has the right to convert all or any of the con<span class=\"_ _4\"></span>vert<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>80% of the low<span class=\"_ _4\"></span>est closing volume-w<span class=\"_ _4\"></span>eighted aver<span class=\"_ _4\"></span>age<span class=\"_ _1a9\"> </span> ible bonds and commitment fee con<span class=\"_ _4\"></span>vertible bonds into<span class=\"_ _1a9\"> </span> price (VW<span class=\"_ _1\"></span>AP) over a period of 15 consecutive tr<span class=\"_ _4\"></span>ading<span class=\"_ _1a9\"> </span> new shares at an<span class=\"_ _4\"></span>y time.<span class=\"_ _1a9\"> </span> days expiring on the trading day immediately pr<span class=\"_ _4\"></span>eceding<span class=\"_ _1a9\"> </span> the date of issuance of a conversion notice<span class=\"_ _4\"></span>.  Ther<span class=\"_ _4\"></span>e is no<span class=\"_ _1a9\"> </span> The number of shar<span class=\"_ _4\"></span>es to be issued upon conversion shall<span class=\"_ _1a9\"> </span> liquidity condition or cool down period<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>be equal to the conversion amount divided b<span class=\"_ _4\"></span>y the appli<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cable conver<span class=\"_ _4\"></span>sion price,<span class=\"_ _1\"></span> provided that it shall not exceed<span class=\"_ _1a9\"> </span> The number of shar<span class=\"_ _4\"></span>es to be issued upon conversion shall<span class=\"_ _1a9\"> </span> a maximum of 38<span class=\"_ _1\"></span>,291<span class=\"_ _4\"></span>,950 shares<span class=\"_ _4\"></span>. If the Investor does<span class=\"_ _1a9\"> </span> be equal to the conversion amount divided b<span class=\"_ _4\"></span>y the appli<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>not receive the relevant shar<span class=\"_ _4\"></span>es,<span class=\"_ _1\"></span> the Issuer shall pay to the<span class=\"_ _1a9\"> </span> cable conver<span class=\"_ _4\"></span>sion price. T<span class=\"_ _4\"></span>he cap of 38<span class=\"_ _1\"></span>,291,950 shar<span class=\"_ _4\"></span>es is<span class=\"_ _1a9\"> </span> Investor an amount in cash (<span class=\"ff3 ws105\">\u201cP<span class=\"_ _4\"></span>art A of F<span class=\"_ _4\"></span>unding Program\u201d<span class=\"ff1 ws0\">)<span class=\"_ _1a9\"> </span></span></span>deleted from the terms and conditions of the agreement.<span class=\"_ _1a9\"> </span> On September 2,<span class=\"_ _4\"></span> 2022,<span class=\"_ _1\"></span> the par<span class=\"_ _3\"></span>ties amended the terms<span class=\"_ _1a9\"> </span> The convertible bonds described abo<span class=\"_ _4\"></span>ve meets the defini<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>and conditions of part of the funding program (<span class=\"ff3 wsdd\">\u201cPart B\u201d</span><span class=\"ws0\">)<span class=\"_ _1a9\"> </span></span><span class=\"ws0\"> </span>tion of a financial liability given that the conversion price<span class=\"_ _1a9\"> </span> for an amount of up to 6 million euro of the total com<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>is not fixed and upon conversion,<span class=\"_ _1\"></span> will result in a variable<span class=\"_ _1a9\"> </span> mitment through the issuance and subscription of up<span class=\"_ _1a9\"> </span> number of shares being issued<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> being the nominal amount<span class=\"_ _1a9\"> </span> to 2.400 of the convertible bonds (<span class=\"ff3 ws45\">\u201cPart B Convertible<span class=\"_ _1a9\"> </span></span><span class=\"ff3 ws45\"> </span>of the convertible loan divided by the con<span class=\"_ _4\"></span>version price. T<span class=\"_ _4\"></span>he<span class=\"_ _1a9\"> </span>convertible bond is also a derivative financial liability as the conversion featur<span class=\"_ _4\"></span>e is an embedded derivative of the loan host. The host and the derivative will not be separated and are accounted for as one h<span class=\"_ _4\"></span>ybrid financial liability<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>The financial liability is measured at f<span class=\"_ _4\"></span>air value through profit or loss<span class=\"_ _4\"></span>. The initial fair value of the convertible loan equals an amount of cash received in the amount of <span class=\"_ _18d\"></span><span class=\"ws0\"> </span>9<span class=\"_ _1\"></span>.650 million euro of which 2.5 million euro w<span class=\"_ _4\"></span>as received in 2021 and 7<span class=\"_ _25\"></span>.150 million euro was received in 2022 (5 million euro P<span class=\"_ _4\"></span>art A and 4.650 million euro P<span class=\"_ _4\"></span>art B)<span class=\"_ _4\"></span>. A total of 1<span class=\"_ _4\"></span>.350 million euro w<span class=\"_ _4\"></span>as already con<span class=\"_ _4\"></span>verted into shares befor<span class=\"_ _4\"></span>e December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _4\"></span>. During 2022 another 9<span class=\"_ _1\"></span>.025 million euro has been converted into shares befor<span class=\"_ _4\"></span>e December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> fo<span class=\"_ _4\"></span>llowing the conver<span class=\"_ _4\"></span>sion of (in aggregate) 3<span class=\"_ _4\"></span>.610 convertible bonds that w<span class=\"_ _4\"></span>ere issued<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Subsequently<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> the fair value of the convertible loan related to the Part A convertible bonds as per December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> is determined as the nominal amount of the convertible loan plus 8%. The 8% r<span class=\"_ _4\"></span>epresents the differ<span class=\"_ _4\"></span>ence between the share price and the 92% of the lo<span class=\"_ _4\"></span>west closing VW<span class=\"_ _25\"></span>AP<span class=\"_ _25\"></span>. Given the volatility of the share prices as per y<span class=\"_ _4\"></span>ear ending December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> the fair value of the con<span class=\"_ _4\"></span>vertible loan related to the P<span class=\"_ _4\"></span>art B Conver<span class=\"_ _3\"></span>tible bonds is based on the intrinsic value approach. Considering the term of the convertible loan to be less than twelve months<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> no option pricing model is used<span class=\"_ _4\"></span>. The outstanding con<span class=\"_ _4\"></span>vertible loan has a nominal value of 0<span class=\"_ _1\"></span>.5 million euro as per 3<span class=\"_ _4\"></span>1 December 2022 and the fair value is determined at 1<span class=\"_ _4\"></span>.06 million euro with changes in the fair value r<span class=\"_ _4\"></span>ecorded in profit and loss as fair value gains and losses on the convertible loan.<span class=\"ws0\"> </span>The fair value loss in the amount of 0<span class=\"_ _25\"></span>.426 million euro as per December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> is inc<span class=\"_ _4\"></span>luded in the line item \u2018F<span class=\"_ _4\"></span>inance expense\u2019 in the consolidated statement of profit and loss.<span class=\"_ _1a9\"> </span>The fair value of the con<span class=\"_ _4\"></span>verted bonds during 2022 was 16<span class=\"_ _1\"></span>.423 million euro<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he difference betw<span class=\"_ _4\"></span>een the fair value and the nominal amount was r<span class=\"_ _4\"></span>ecorded in profit and loss as fair value loss included in the line finance expense f<span class=\"_ _4\"></span>or an amount of 7<span class=\"_ _25\"></span>.824 million euro and 0<span class=\"_ _25\"></span>.426 million euro in other reser<span class=\"_ _3\"></span>ves upon conversion.<span class=\"_ _1a9\"> </span>Upon conversion,<span class=\"_ _1\"></span> the financial liability measured at fair value at date of conversion will be r<span class=\"_ _4\"></span>eclassified to share<span class=\"_ _4\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>holders<span class=\"_ _4\"></span>\u2019 equity<span class=\"_ _25\"></span>. The liability for the first instalment of the P<span class=\"_ _4\"></span>art A commit<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ment fee of 0<span class=\"_ _1\"></span>.525 million euro (50% upon signing of the agreement) is made once the first T<span class=\"_ _25\"></span>ranche Call is called by the Compan<span class=\"_ _4\"></span>y<span class=\"_ _25\"></span>. The commitment fee is recorded in profit and loss as transaction cost due<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> given the Company cannot avoid cash settlement if the Investor r<span class=\"_ _4\"></span>equests eventual payment in cash. These transaction costs ar<span class=\"_ _4\"></span>e included in the line item \u2018F<span class=\"_ _4\"></span>inance expense\u2019 in the consoli<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>dated statement of profit and loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The second instalment of the P<span class=\"_ _4\"></span>art A commitment fee of 0<span class=\"_ _1\"></span>.525 million euro is recognized if and only if a tr<span class=\"_ _4\"></span>anche call is exercised by the Issuer<span class=\"_ _25\"></span>, as a r<span class=\"_ _4\"></span>esult of which in total more than half of the total commitment will have been called<span class=\"_ _4\"></span>. This commitment f<span class=\"_ _4\"></span>ee is considered as a transaction cost in accordance with IFRS 9 and expensed as incurred as financial expense,<span class=\"_ _1\"></span> given it is an incremental cost that the Company w<span class=\"_ _4\"></span>ould not incur if the triggering condition is not met. This second instalment has not been accounted for as per December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022, since ther<span class=\"_ _4\"></span>e is no present obligation y<span class=\"_ _4\"></span>et.<span class=\"_ _1a9\"> </span>The P<span class=\"_ _4\"></span>art B waiver and commitment fee of 0<span class=\"_ _1\"></span>.7<span class=\"_ _4\"></span> million euro payable in 280 convertible bonds with a nominal value of 0<span class=\"_ _1\"></span>.0025 million euro became due upon the payment of the first tranc<span class=\"_ _4\"></span>he under Part B pursuant to the addendum and is recorded as financial expense in the consolidated statement of profit and loss given these are consider<span class=\"_ _4\"></span>ed as<span class=\"_ _1a9\"> </span>transactions costs<span class=\"_ _4\"></span>. The corr<span class=\"_ _4\"></span>esponding liability is measured<span class=\"_ _1a9\"> </span> 2. <span class=\"_ _109\"> </span><span class=\"ws9d\">The con<span class=\"_ _4\"></span>version price may be adjusted from time to<span class=\"_ _1a9\"> </span></span><span class=\"ws9d\"> </span>at fair value through profit and loss<span class=\"_ _4\"></span>. Upon conversion the<span class=\"_ _1a9\"> </span> time upon the occurrence of corpor<span class=\"_ _4\"></span>ate actions,<span class=\"_ _1\"></span> such<span class=\"_ _1a9\"> </span> financial liability measured at fair value at the date of con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>as merger<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> demerger<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> stoc<span class=\"_ _4\"></span>k splits or reverse stoc<span class=\"_ _4\"></span>k split,<span class=\"_ _1\"></span> version,<span class=\"_ _4\"></span> will be r<span class=\"_ _4\"></span>eclassified to shar<span class=\"_ _4\"></span>eholders equity<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span> in accordance with the adjustment policy set out in the<span class=\"_ _1a9\"> </span> Euronext Corporate Action P<span class=\"_ _4\"></span>olicy<span class=\"_ _1a9\"> </span>Kreos Capital / P<span class=\"_ _4\"></span>ontifax V<span class=\"_ _1\"></span>entures<span class=\"_ _1a9\"> </span>3.<span class=\"_ _23\"></span> <span class=\"_ _10a\"> </span><span class=\"ls0 ws25\">In the event that,<span class=\"_ _1\"></span> between the issue date of the Kreos<span class=\"_ _1a9\"> </span></span><span class=\"ls0 ws25\"> </span>Bonds and the date falling twelve months after the<span class=\"_ _1a9\"> </span> On November 21<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> Oxurion (the Company or the<span class=\"_ _1a9\"> </span> Loan F<span class=\"_ _1\"></span>acility (i.e. 22 No<span class=\"_ _4\"></span>vember 2022,<span class=\"_ _4\"></span> the Compan<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span> Issuer) entered into the Loan F<span class=\"_ _1\"></span>acility whereb<span class=\"_ _4\"></span>y Kreos<span class=\"_ _1a9\"> </span> issued any shar<span class=\"_ _4\"></span>es in the context of an equity financing<span class=\"_ _1a9\"> </span> Capital VI Limited together with Pontif<span class=\"_ _4\"></span>ax Medison<span class=\"_ _1a9\"> </span> at an issue price per share which r<span class=\"_ _4\"></span>epresents a<span class=\"_ _1a9\"> </span> F<span class=\"_ _4\"></span>inance L.P<span class=\"_ _25\"></span>. (the Investor<span class=\"_ _4\"></span>s) as investors are willing to<span class=\"_ _1a9\"> </span> discount of more than 20% to the VW<span class=\"_ _25\"></span>AP (volume-<span class=\"ws0\"> </span>subscribe to convertible bonds with each a nominal value<span class=\"_ _1a9\"> </span> weighted a<span class=\"_ _4\"></span>verage price) over the thirty trading days<span class=\"_ _1a9\"> </span> of 0<span class=\"_ _1\"></span>.1 million euro<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> in an amount of 10<span class=\"_ _1\"></span>.0 million euro<span class=\"_ _4\"></span>. <span class=\"_ _18d\"></span><span class=\"ws0\"> </span>period preceding the date of such issuance of shar<span class=\"_ _4\"></span>es,<span class=\"_ _1\"></span> The Investor<span class=\"_ _4\"></span>s are entitled to a transaction fee of 0<span class=\"_ _25\"></span>.125<span class=\"_ _1a9\"> </span> the Kreos Conver<span class=\"_ _4\"></span>sion Price shall be adjusted to 140%<span class=\"_ _1a9\"> </span> million euro and an end of loan payment equal to 3<span class=\"_ _1\"></span>.5%<span class=\"_ _1a9\"> </span> of the average issue price of all shar<span class=\"_ _4\"></span>es issued by the<span class=\"_ _1a9\"> </span> that shall accrue on the amount dra<span class=\"_ _4\"></span>wn under each tranc<span class=\"_ _4\"></span>he.<span class=\"_ _1a9\"> </span> Company in the context of an<span class=\"_ _4\"></span>y equity financing since<span class=\"_ _1a9\"> </span> The convertible bonds accrue inter<span class=\"_ _4\"></span>est in the amount of<span class=\"_ _1a9\"> </span> the issue date of the Kreos Bonds (if lo<span class=\"_ _4\"></span>wer than the<span class=\"_ _1a9\"> </span> 7<span class=\"_ _25\"></span>.95% per year<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span> Kreos Conver<span class=\"_ _4\"></span>sion Price)<span class=\"_ _4\"></span>. As a result,<span class=\"_ _1\"></span> the strike price<span class=\"_ _1a9\"> </span> was r<span class=\"_ _4\"></span>eset at 0<span class=\"_ _1\"></span>.28 euro per share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The convertible bonds may be either:<span class=\"_ _1a9\"> </span>On June 21<span class=\"_ _1\"></span>, 2022,<span class=\"_ _1\"></span> the Company<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> Kreos Capital VI<span class=\"_ _1a9\"> </span> 1.<span class=\"_ _3\"></span> <span class=\"_ _62\"> </span><span class=\"ls0 ws172\">Converted in shares at the option of the Investors at<span class=\"_ _1a9\"> </span></span><span class=\"ls0 ws172\"> </span>Limited and Pontif<span class=\"_ _4\"></span>ax Medison F<span class=\"_ _4\"></span>inance L.P<span class=\"_ _25\"></span>. executed an<span class=\"_ _1a9\"> </span> any time<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>amendment to the convertible bond facility<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> pursuant<span class=\"_ _1a9\"> </span> 2. <span class=\"_ _109\"> </span><span class=\"ws159\">Converted in shares at the option of the Issuer when<span class=\"_ _1a9\"> </span></span><span class=\"ws159\"> </span>to which a repayment of 3<span class=\"_ _1\"></span>.0 million euro (30%) of the<span class=\"_ _1a9\"> </span> certain conditions are met.<span class=\"_ _1a9\"> </span>principal amount (excluding capitalized interest) of the<span class=\"_ _1a9\"> </span> 3.<span class=\"_ _23\"></span> <span class=\"_ _10a\"> </span><span class=\"ls0 wsc2\">Repaid based on the amortization schedule without<span class=\"_ _1a9\"> </span></span><span class=\"ls0 wsc2\"> </span>first tranc<span class=\"_ _4\"></span>he of 10<span class=\"_ _1\"></span>.0 million euro was made<span class=\"_ _4\"></span>. As part of the<span class=\"_ _1a9\"> </span> extension.<span class=\"_ _1a9\"> </span>amendment,<span class=\"_ _4\"></span> it w<span class=\"_ _4\"></span>as agreed that the cash co<span class=\"_ _4\"></span>venant would<span class=\"_ _1a9\"> </span> 4.<span class=\"_ _3\"></span> <span class=\"_ _109\"> </span><span class=\"ls0 ws234\">Repaid based on the amor<span class=\"_ _3\"></span>tization schedule with<span class=\"_ _1a9\"> </span></span><span class=\"ls0 ws234\"> </span>be reduced from 4<span class=\"_ _4\"></span>.0 million euro to 3<span class=\"_ _1\"></span>.0 million euro<span class=\"_ _1\"></span>, the<span class=\"_ _1a9\"> </span> extension.<span class=\"_ _1a9\"> </span>repayment schedule w<span class=\"_ _4\"></span>as revised and the inter<span class=\"_ _4\"></span>est only<span class=\"_ _1a9\"> </span> 5.<span class=\"_ _23\"></span> <span class=\"_ _109\"> </span><span class=\"ls0 ws0\">Prepaid when cer<span class=\"_ _3\"></span>tain conditions are met.<span class=\"_ _1a9\"> </span></span>period was extended to September 30<span class=\"_ _25\"></span>, 2022. A<span class=\"_ _4\"></span>t the same<span class=\"_ _1a9\"> </span> 6.<span class=\"_ _23\"></span> <span class=\"_ _10a\"> </span><span class=\"ls0 ws8c\">P<span class=\"_ _4\"></span>aid in full in case of events of default or change in<span class=\"_ _1a9\"> </span></span><span class=\"ls0 ws8c\"> </span>time,<span class=\"_ _1\"></span> Kreos/Pontif<span class=\"_ _4\"></span>ax agreed not exercise an<span class=\"_ _4\"></span>y rights they<span class=\"_ _1a9\"> </span> control.<span class=\"_ _1a9\"> </span>might have had to reco<span class=\"_ _4\"></span>ver amounts ow<span class=\"_ _4\"></span>ed to them under<span class=\"_ _1a9\"> </span> the Loan Agreement pro<span class=\"_ _4\"></span>vided that certain conditions are<span class=\"_ _1a9\"> </span> The number of shar<span class=\"_ _4\"></span>es to be issued upon conversion shall<span class=\"_ _1a9\"> </span> met,<span class=\"_ _4\"></span> the fulfilment of whic<span class=\"_ _4\"></span>h is uncertain.<span class=\"_ _1a9\"> </span>be equal to the conversion amount divided b<span class=\"_ _4\"></span>y the applica<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ble conver<span class=\"_ _4\"></span>sion price:<span class=\"_ _1a9\"> </span>The convertible bond described abo<span class=\"_ _4\"></span>ve meets the definition<span class=\"_ _1a9\"> </span> of a financial liability given that the Company cannot a<span class=\"_ _4\"></span>void<span class=\"_ _1a9\"> </span> 1.<span class=\"_ _3\"></span> <span class=\"_ _62\"> </span><span class=\"ls0 wsc8\">The initial conver<span class=\"_ _4\"></span>sion price of the Bonds was equal to<span class=\"_ _1a9\"> </span></span><span class=\"ls0 wsc8\"> </span>delivering cash to the investors and the con<span class=\"_ _4\"></span>version price<span class=\"_ _1a9\"> </span> 2.90 euro<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>is not fixed<span class=\"_ _4\"></span>. The Compan<span class=\"_ _4\"></span>y cannot avoid delivering cash as<span class=\"_ _1a9\"> </span> they do not have control o<span class=\"_ _4\"></span>ver the different scenarios<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he<span class=\"_ _1a9\"> </span> conversion price can also c<span class=\"_ _4\"></span>hange upon certain scenario\u2019<span class=\"_ _1\"></span>s<span class=\"_ _1a9\"> </span>as described above and as suc<span class=\"_ _4\"></span>h the number of shares being issued will var<span class=\"_ _3\"></span>y based on the conversion price<span class=\"_ _4\"></span>. The convertible bond is also a derivative financial liability as the conversion featur<span class=\"_ _4\"></span>e is an embedded derivative of the loan host. The host and the derivative will not be separated<span class=\"_ _1\"></span>. The financial liability is measured at f<span class=\"_ _4\"></span>air value through profit or loss<span class=\"_ _4\"></span>. In determining the fair value,<span class=\"_ _1\"></span> the company makes certain judgements on the valuation model to be applied and the probability that certain scenarios will occur or not in the future<span class=\"_ _4\"></span>. The fair value of the con<span class=\"_ _4\"></span>vertible bonds has been measured considering the follo<span class=\"_ _4\"></span>wing scenarios that may impact the term of the bond:<span class=\"_ _1a9\"> </span>1.<span class=\"_ _3\"></span> <span class=\"_ _62\"> </span><span class=\"ls0 ws0\">No extension<span class=\"_ _1a9\"> </span></span>2. <span class=\"_ _109\"> </span>With extension<span class=\"_ _1a9\"> </span>3.<span class=\"_ _23\"></span> <span class=\"_ _10a\"> </span><span class=\"ls0 ws0\">Pr<span class=\"_ _4\"></span>epaid when certain conditions are met.<span class=\"_ _1a9\"> </span></span>4.<span class=\"_ _3\"></span> <span class=\"_ _109\"> </span><span class=\"ls0 ws8c\">Paid in full in case of events of default or change in </span>control.<span class=\"_ _1a9\"> </span>The initial fair value of the con<span class=\"_ _4\"></span>vertible loan equals the amount of cash received which is 10<span class=\"_ _25\"></span>.0 million euro as per December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _4\"></span>. Subsequently the f<span class=\"_ _4\"></span>air value is de<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>termined as the probability weighted a<span class=\"_ _4\"></span>verage of the fair values of the different scenarios described abo<span class=\"_ _4\"></span>ve consid<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ering the pre-payment agreed on J<span class=\"_ _4\"></span>une 21<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022. The fair value of the scenarios has been determined by app<span class=\"_ _4\"></span>lication of the effective interest r<span class=\"_ _4\"></span>ate method and the Black<span class=\"_ _1\"></span>-Scholes model. The payment b<span class=\"_ _4\"></span>y the Company to P<span class=\"_ _4\"></span>ontifax Medison F<span class=\"_ _4\"></span>inance L.P is paid in USD b<span class=\"_ _4\"></span>y converting the relevant due amount in euro into the USD at a fixed exchange r<span class=\"_ _4\"></span>ate. F<span class=\"_ _1\"></span>or Pontif<span class=\"_ _4\"></span>ax,<span class=\"_ _4\"></span> the fair value of the con<span class=\"_ _4\"></span>vertible loan is deter<span class=\"_ _4\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mined based on the application of the effective inter<span class=\"_ _4\"></span>est rate method considering the USD loan payment at the spot rate at valuation date<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The abo<span class=\"_ _4\"></span>ve fair value measurement is a level 3 as a r<span class=\"_ _4\"></span>esult of the unobser<span class=\"_ _3\"></span>vable input for the probabilities<span class=\"_ _4\"></span>. A reason<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>able change of the pr<span class=\"_ _4\"></span>obabilities between the differ<span class=\"_ _4\"></span>ent sce<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>nario<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s would not lead to a material c<span class=\"_ _4\"></span>hange in the fair value<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The fair value as per December 3<span class=\"_ _4\"></span>1<span class=\"_ _1\"></span>, 2022,<span class=\"_ _1\"></span> is determined at 5<span class=\"_ _1\"></span>.984 million euro<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> taking into account the repayment of 3 million euro<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> with changes in the fair value recorded in profit and loss as fair value gains and losses on the con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>vertible loan. The fair value gain in the amount of 0<span class=\"_ _1\"></span>.436 million euro as per December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022, ar<span class=\"_ _4\"></span>e included in the line item \u2018F<span class=\"_ _4\"></span>inance income\u2019 in the consolidated statement of profit and loss<span class=\"_ _4\"></span>. No amounts have already been con<span class=\"_ _4\"></span>verted into shares as per December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022.<span class=\"_ _1a9\"> </span>Upon conversion,<span class=\"_ _1\"></span> the financial liability measured at fair value at date of conversion will be r<span class=\"_ _4\"></span>eclassified to share<span class=\"_ _4\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>holders<span class=\"_ _4\"></span>\u2019 equity<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> being shar<span class=\"_ _4\"></span>e capital and share premium and other reser<span class=\"_ _3\"></span>ves for the fair value adjustment portion. The Loan F<span class=\"_ _1\"></span>acility is subject to a financial covenant wher<span class=\"_ _4\"></span>eby the Group is requir<span class=\"_ _4\"></span>ed to maintain at all times a minimum aggregate amount of cash in the bank of an amount equal to the low<span class=\"_ _4\"></span>er of 3 million euro and the principal amount outstanding. The Group has comp<span class=\"_ _4\"></span>lied with the financial covenant at December 3<span class=\"_ _4\"></span>1<span class=\"_ _1\"></span>, 202<span class=\"_ _1a9\"> </span>2<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-17": {
   "value": "As of December 31, 2022, the majority of cash and cash equivalents are cash at banks available on demand. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCashAndCashEquivalentsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-19": {
   "value": "Leuven",
   "dimensions": {
    "concept": "ifrs-full:PrincipalPlaceOfBusiness",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-18": {
   "value": "Belgium",
   "dimensions": {
    "concept": "ifrs-full:CountryOfIncorporation",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-43": {
   "value": "5.5.7  Financial risk management The financial department of the parent Company coor- dinates access to the national and international financial markets and considers and manages the financial risks relating to the activities of the Group. The financial risks related to the operating activities of the Group are confined to a minimal currency exchange rate risk. There are no risks worth mentioning, such as liquidity risks or interest rate risks as the Group has no debts with variable interest rates. The Group does not buy or trade in financial instru- ments for speculative purposes. (A)  CAPITAL MANAGEMENT The Group manages its capital with the aim of ensuring that the Group can continue to operate. At the same time, the Group wishes to generate a return for its stake- holders via the results of its research activities, which in turn are expected to lead to an increase in the value of the Company\u2019s shares. This strategy has not changed compared to previous years. The capital structure of the Group consists of investments, cash, cash equivalents and restricted cash, and equity at- tributable to the equity holders of the Company, including capital, reserves and results carried over, as indicated in notes 5.7.7 and 5.7.8 respectively. The Group manages its capital structure and makes the necessary adjustments in light of changes in economic circumstances, the risk characteristics of the underlying assets and the projected cash requirements of current research activities. When assessing the capital structure, the current cash position and projected cash burn are used as the key parameters. Cash burn is defined as the net result corrected for depreciation and amortization, stock- based compensation, and less investments in fixed assets. The Group wishes to maintain a capital structure that is sufficient to fund research activities during a period of at least twelve months. Any cash inflows from possible coop- eration agreements or other cash generating activities are not taken into account. To maintain the capital structure, the Group can issue new shares or conclude new (B)  MAIN ACCOUNTING PRINCIPLES Details of the main accounting principles and methods, including the inclusion criteria, the valuation basis, and the basis on which income and costs are recognized, for each category of financial assets, liabilities, and equity instru- ments, are explained under 5.5.3. (C)  CATEGORIES OF FINANCIAL INSTRUMENTS The financial instruments currently held by the Company are: \u2022  Trade receivables and payables \u2022  Short-term financial liabilities \u2022  Cash, cash equivalents and investments (we refer to note 5.7.6) amounting to 3.6 million euro (2021: 10.0 million euro). Investments are mainly in very low risk bonds and term investments. \u2022  Convertible bonds (we refer to note 5.5.6 ) Analysis of sensitivity to exchange rates The Group is mainly exposed to fluctuations in GBP and  USD against the euro. The sensitivity of loss to changes in the exchange rates  arises mainly from USD and GBP denominated financial  instruments. N '000 EURO IMPACT ON PAST TAX LOSS 2022 2021 USD/euro exchange rate increase 10% 163 -339 USD/euro exchange rate decrease 10% -200 415 GBP/euro exchange rate increase 10% 7 6 GBP/euro exchange rate decrease 10% -9 - 7 (E)  INTEREST RISK MANAGEMENT At the moment, the Group has external debt financing  with a fixed interest rate. The Group does not have any  contracts with a variable interest rate. Consequently, there  is currently no need for a specific interest risk manage- ment policy in the Group. (F)  CREDIT RISK MANAGEMENT Credit risk relates to the risk that a counterparty will fail to  fulfil their contractual obligations with the result that the  Group would suffer a loss. The Group\u2019s policy focuses on  only working with credit-worthy counterparties and, where  necessary, requiring adequate securities. Information about  the creditworthiness of counterparties is provided by inde- pendent ratings agencies and, if this is not available, the  Group uses information that is publicly available as well  as its own internal records. Credit risk is managed by the  financial department of Oxurion by means of individual  follow-up of credit per counterparty. The Group has a limited number of customers. Credit  risk is considered as remote due to a history of no issues  with payment collection. So far, the collection of payments  happened without any delay and with limited credit risk. The credit risk on cash investments is limited given that the  counterparties are banks with high credit scores attributed  by international rating agencies . (G)  LIQUIDITY RISK MANAGEMENT The Group manages its liquidity risk by ensuring adequate reserves and by constantly checking the projected and actual cash flows. At the moment, the Group is not subject to any substantial liquidity risk. Contractual undiscounted maturities of financial liabilities at December 31, 2021 and 2022 are as follows: IN '000 EURO (AS AT  LESS THAN 6 MONTHS 6 - 12 MONTHS BETWEEN 1 AND 2 YEARS BETWEEN 2 AND 5 YEARS OVER 5 YEARS TOTAL 31 DECEMBER 2021) Lease liabilities 162 59 30 15 0 266 Convertible loans 300 1,910 4,464 5,187 0 11,861 Trade payables 4,979 0 0 0 0 4,979 Other short-term liabilities 628 0 0 0 0 628 Total financial liabilities 6,069 1,969 4,494 5,202 0 17,734 IN '000 EURO (AS AT  31 DECEMBER 2022) LESS THAN 6 MONTHS 6 - 12 MONTHS BETWEEN 1 AND 2 YEARS BETWEEN 2 AND 5 YEARS OVER 5 YEARS TOTAL Lease liabilities 88 78 144 389 394 1,093 Convertible loans 1,728 1,728 3,456 541 0 7,453 Trade payables 5,040 0 0 0 0 5,040 Other short-term liabilities 2,813 0 0 0 0 2,813 Total financial liabilities 9,669 1,806 3,600 930 394 16,399 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialRiskManagementExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-20": {
   "value": "(A)  CAPITAL MANAGEMENT The Group manages its capital with the aim of ensuring that the Group can continue to operate. At the same time, the Group wishes to generate a return for its stake- holders via the results of its research activities, which in turn are expected to lead to an increase in the value of the Company\u2019s shares. This strategy has not changed compared to previous years. The capital structure of the Group consists of investments, cash, cash equivalents and restricted cash, and equity at- tributable to the equity holders of the Company, including capital, reserves and results carried over, as indicated in notes 5.7.7 and 5.7.8 respectively. The Group manages its capital structure and makes the necessary adjustments in light of changes in economic circumstances, the risk characteristics of the underlying assets and the projected cash requirements of current research activities. When assessing the capital structure, the current cash position and projected cash burn are used as the key parameters. Cash burn is defined as the net result corrected for depreciation and amortization, stock- based compensation, and less investments in fixed assets. The Group wishes to maintain a capital structure that is sufficient to fund research activities during a period of at least twelve months. Any cash inflows from possible coop- eration agreements or other cash generating activities are not taken into account. To maintain the capital structure, the Group can issue new shares or conclude new ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfObjectivesPoliciesAndProcessesForManagingCapitalExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-68": {
   "value": "D)  MARKET RISK The Group\u2019s activities are such that the Group\u2019s income is  exposed to financial risks arising from currency exchange  rate fluctuations because a substantial proportion of  the research expenditure is invoiced in USD and pound  sterling (GBP). The Group tries to compensate the inflows  and outflows in foreign currenc Analysis of sensitivity to exchange rates The Group is mainly exposed to fluctuations in GBP and  USD against the euro. The sensitivity of loss to changes in the exchange rates  arises mainly from USD and GBP denominated financial  instruments. N '000 EURO IMPACT ON PAST TAX LOSS 2022 2021 USD/euro exchange rate increase 10% 163 -339 USD/euro exchange rate decrease 10% -200 415 GBP/euro exchange rate increase 10% 7 6 GBP/euro exchange rate decrease 10% -9 - 7 (E)  INTEREST RISK MANAGEMENT At the moment, the Group has external debt financing  with a fixed interest rate. The Group does not have any  contracts with a variable interest rate. Consequently, there  is currently no need for a specific interest risk manage- ment policy in the Group. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfMarketRiskExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-129": {
   "value": "Analysis of sensitivity to exchange rates The Group is mainly exposed to fluctuations in GBP and  USD against the euro. The sensitivity of loss to changes in the exchange rates  arises mainly from USD and GBP denominated financial  instruments. N '000 EURO IMPACT ON PAST TAX LOSS 2022 2021 USD/euro exchange rate increase 10% 163 -339 USD/euro exchange rate decrease 10% -200 415 GBP/euro exchange rate increase 10% 7 6 GBP/euro exchange rate decrease 10% -9 - 5.6.7  Finance income IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Interest 9 9 Fair value adjustment convertible bonds 436 0 Exchange rate gain (on USD and GBP) 194 162 Total finance income 639 171 As a result of USD revaluations, the unrealized exchange gain in 2022 amounted to 0.177 million euro (2021: 0.146 million euro) whereas 0.017 million euro exchange gains were realized (2021: 0.016 million euro). The fair value adjustment convertible bonds relate for 0.436 million euro to the Kreos/Pontifax convertible bond (2021: 0.025 million euro finance expense). We refer to note 5.7.11 for more information. 5.6.8  Finance expense IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Bank costs -21 -26 Impairment on short-term financial investments -15 -5 Fair value adjustment convertible bonds -7,824 -372 Other -1,349 -713 Exchange rate loss (on USD and GBP) -170 -152 Total finance expense -9,379 -1,268 The fair value adjustment convertible bonds relate for 7.824 million euro to the Negma convertible bond (2021: 0.347 million euro). We refer to note 5.7.11 for more information The other financial expenses relate for 0.700 million euro to the Negma convertible bond (2021: 0.525 million euro), 0.636 million euro to the Kreos/Pontifax convertible bond (2021: 0.177 million euro) and 0.013 million euro to other (2021: 0.011 million euro). As a result of USD revaluations, the unrealized exchange losses in 2022 amounted to 0.004 million euro (2021: 0.138 million euro) whereas 0.166 million euro exchange losses were realized (2021: 0.014 million euro ) 5.7.8  Other comprehensive income and other reserves The other comprehensive income is detailed as follows: CURRENCY REMEASURE- FAIR VALUE ADJUST- IN '000 EURO TRANSLATION MENT DEFINED MENTS OF DEBT TOTAL ADJUSTMENT BENEFIT INSTRUMENTS OCI PLANS 31 December 2020 -378 -661 0 -1,039 Movements in OCI 122 566 -5 683 31 December 2021 -256 -95 -5 -356 Movements in OCI 101 361 -5 457 31 December 2022 -155 266 -10 101 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEffectOfChangesInForeignExchangeRatesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-69": {
   "value": "(F)  CREDIT RISK MANAGEMENT Credit risk relates to the risk that a counterparty will fail to  fulfil their contractual obligations with the result that the  Group would suffer a loss. The Group\u2019s policy focuses on  only working with credit-worthy counterparties and, where  necessary, requiring adequate securities. Information about  the creditworthiness of counterparties is provided by inde- pendent ratings agencies and, if this is not available, the  Group uses information that is publicly available as well  as its own internal records. Credit risk is managed by the  financial department of Oxurion by means of individual  follow-up of credit per counterparty. The Group has a limited number of customers. Credit  risk is considered as remote due to a history of no issues  with payment collection. So far, the collection of payments  happened without any delay and with limited credit risk. The credit risk on cash investments is limited given that the  counterparties are banks with high credit scores attributed  by international rating agencies ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCreditRiskExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-70": {
   "value": "(G)  LIQUIDITY RISK MANAGEMENT The Group manages its liquidity risk by ensuring adequate reserves and by constantly checking the projected and actual cash flows. At the moment, the Group is not subject to any substantial liquidity risk. Contractual undiscounted maturities of financial liabilities at December 31, 2021 and 2022 are as follows: IN '000 EURO (AS AT  LESS THAN 6 MONTHS 6 - 12 MONTHS BETWEEN 1 AND 2 YEARS BETWEEN 2 AND 5 YEARS OVER 5 YEARS TOTAL 31 DECEMBER 2021) Lease liabilities 162 59 30 15 0 266 Convertible loans 300 1,910 4,464 5,187 0 11,861 Trade payables 4,979 0 0 0 0 4,979 Other short-term liabilities 628 0 0 0 0 628 Total financial liabilities 6,069 1,969 4,494 5,202 0 17,734 IN '000 EURO (AS AT  31 DECEMBER 2022) LESS THAN 6 MONTHS 6 - 12 MONTHS BETWEEN 1 AND 2 YEARS BETWEEN 2 AND 5 YEARS OVER 5 YEARS TOTAL Lease liabilities 88 78 144 389 394 1,093 Convertible loans 1,728 1,728 3,456 541 0 7,453 Trade payables 5,040 0 0 0 0 5,040 Other short-term liabilities 2,813 0 0 0 0 2,813 Total financial liabilities 9,669 1,806 3,600 930 394 16,399 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfLiquidityRiskExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-71": {
   "value": "5.5.8  Remuneration of Key Management Personnel Key management personnel were constituted in 2022 of: \u2022  Tom Graney \u2013 CEO The key management personnel constitute the CEO as per Company\u2019s corporate chapter. Remuneration of key management personnel was as follows: IN '000 EURO (EXCEPT FOR THE NUMBER OF STOCK 2022 2021 OPTIONS) (AS AT 31 DECEMBER) Short-term benefits - consultancy fees / salary 562 652 Termination benefits 0 159 Cost of stock options granted in the year 0 662 Number of stock options granted in the year 0 600,000 No loans, quasi-loans or other guarantees have been given to any of the executive directors ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInformationAboutKeyManagementPersonnelExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-102": {
   "value": "5.5.8  Remuneration of Key Management Personnel Key management personnel were constituted in 2022 of: \u2022  Tom Graney \u2013 CEO The key management personnel constitute the CEO as per Company\u2019s corporate chapter. Remuneration of key management personnel was as follows: IN '000 EURO (EXCEPT FOR THE NUMBER OF STOCK 2022 2021 OPTIONS) (AS AT 31 DECEMBER) Short-term benefits - consultancy fees / salary 562 652 Termination benefits 0 159 Cost of stock options granted in the year 0 662 Number of stock options granted in the year 0 600,000 No loans, quasi-loans or other guarantees have been given to any of the executive directors Related parties Other than members of the Board of Directors, no other related parties have been identified. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRelatedPartyExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-89": {
   "value": "5.6  NOTES TO THE CONSOLIDATED STATEMENT OF PROFIT AND LOSS 5.6.1  Income IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Sales 442 967 Income from royalties 153 161 Total revenue 595 1,128 In 2020, Oxurion entered into a global license agreement with Inceptua for the commercialization of JETREA\u00ae. In 2022, Oxurion JETREA\u00ae sales amounted to 0.4 million euro out of which 91% is attributed to Belgium and the remaining to other countries. In 2021, Oxurion JETREA\u00ae sales amounted to 1.0 million euro out of which 61% was attributed to Belgium and the remaining to other countries. For further details we refer to the Key Agreements\u2019 section as disclosed in note 5.8. 5.6.2  Cost of sales IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 License rights on sales -46 -48 Cost of goods -467 -564 Total cost of sales -513 -612 The license rights on sales include the royalties that Oxurion owes to the companies RCT and LSRP on the basis of JETREA\u00ae sales. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFeeAndCommissionIncomeExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-72": {
   "value": "5.6.1  Income IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Sales 442 967 Income from royalties 153 161 Total revenue 595 1,128 In 2020, Oxurion entered into a global license agreement with Inceptua for the commercialization of JETREA\u00ae. In 2022, Oxurion JETREA\u00ae sales amounted to 0.4 million euro out of which 91% is attributed to Belgium and the remaining to other countries. In 2021, Oxurion JETREA\u00ae sales amounted to 1.0 million euro out of which 61% was attributed to Belgium and the remaining to other countries. For further details we refer to the Key Agreements\u2019 section as disclosed in note 5.8. IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Other operating income 830 1,245 Total other operating income 830 1,245 In 2022, Oxurion received other operating income of 0.8 million euro compared to 1.2 million euro in 2021. The accrued tax credit amounts to 0.6 million euro in 2022 compared to 0.9 million euro in 2021 . 5.6.7  Finance income IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Interest 9 9 Fair value adjustment convertible bonds 436 0 Exchange rate gain (on USD and GBP) 194 162 Total finance income 639 171 As a result of USD revaluations, the unrealized exchange gain in 2022 amounted to 0.177 million euro (2021: 0.146 million euro) whereas 0.017 million euro exchange gains were realized (2021: 0.016 million euro). The fair value adjustment convertible bonds relate for 0.436 million euro to the Kreos/Pontifax convertible bond (2021: 0.025 million euro finance expense). We refer to note 5.7.11 for more information",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRevenueExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-115": {
   "value": "5.6.1  Income IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Sales 442 967 Income from royalties 153 161 Total revenue 595 1,128 In 2020, Oxurion entered into a global license agreement with Inceptua for the commercialization of JETREA\u00ae. In 2022, Oxurion JETREA\u00ae sales amounted to 0.4 million euro out of which 91% is attributed to Belgium and the remaining to other countries. In 2021, Oxurion JETREA\u00ae sales amounted to 1.0 million euro out of which 61% was attributed to Belgium and the remaining to other countries. For further details we refer to the Key Agreements\u2019 section as disclosed in note 5.8",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRevenueFromContractsWithCustomersExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-73": {
   "value": "<div class=\"t m0 hd ff3 fs8 fc4 sc0 ls33 ws1c4 gs79\">5.6.<span class=\"_ _23\"></span>2<span class=\"_ _3\"></span> <span class=\"_ _69\"> </span><span class=\"ls4f ws1ae\">C<span class=\"_ _3\"></span>ost<span class=\"_ _3\"></span> of s<span class=\"_ _3\"></span>ale<span class=\"_ _3\"></span>s<span class=\"_ _1a9\"> </span></span></div><div class=\"gs145\"><table class=\"s w1e7 h51\" id=\"_d0b5ecdc-e081-4a59-a049-3fcc2557c797\"><tr><td class=\"c n xf0 y5ed w114 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2cf y5ed w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d0 y5ed w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w1e8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">License rights on sales<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d7 y56b w1e9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-46<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d8 y56b w1ea h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-48<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w1eb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Cost of goods<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d9 y5ba w1ec h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-467<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2da y5ba w1ed h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-564<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w1ee h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal cost of sales<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2db y515 w1ef h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-513<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2dc y515 w1f0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-612<span class=\"_ _1a9\"> </span></div></td></tr></table></div><div class=\"t m4 he ff1 fs9 fc7 sc0 ls15 ws199 gs15\">The license rights on sales include the r<span class=\"_ _4\"></span>oyalties that Oxurion </div><div class=\"t m4 he ff1 fs9 fc7 sc0 ls15 ws19b gs16\">ow<span class=\"_ _4\"></span>es to the companies RCT and LSRP on the basis of </div><div class=\"t m4 he ff1 fs9 fc7 sc0 ls15 ws0 gs148\">JETREA\u00ae sales. </div>l<span class=\"_ _1a9\"> </span>ine with the agreed-upon scope and in line with the set b<span class=\"_ _4\"></span>udget and maintain a presence in the same reg<span class=\"_ _4\"></span>ion. There ar<span class=\"_ _4\"></span>e no other conditions attached to the grants and the outcome of R&amp;D activities does not impact the decision of VLAIO whether the final grant will be received or not. Government gr<span class=\"_ _4\"></span>ants that compensate the Company for expenses incurred and income from the r<span class=\"_ _4\"></span>echarge of costs ar<span class=\"_ _4\"></span>e deducted from the researc<span class=\"_ _4\"></span>h and development expenses on a systematic basis in the same period in which the expenses are incurr<span class=\"_ _4\"></span>ed<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCostOfSalesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-135": {
   "value": "5.6.<span class=\"_ _23\"></span>2<span class=\"_ _3\"></span> <span class=\"_ _69\"> </span><span class=\"ls4f ws1ae\">C<span class=\"_ _3\"></span>ost<span class=\"_ _3\"></span> of s<span class=\"_ _3\"></span>ale<span class=\"_ _3\"></span>s<span class=\"_ _1a9\"> </span></span><table class=\"s w1e7 h51\" id=\"_d0b5ecdc-e081-4a59-a049-3fcc2557c797\"><tr><td class=\"c n xf0 y5ed w114 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2cf y5ed w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d0 y5ed w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w1e8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">License rights on sales<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d7 y56b w1e9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-46<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d8 y56b w1ea h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-48<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w1eb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Cost of goods<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d9 y5ba w1ec h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-467<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2da y5ba w1ed h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-564<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w1ee h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal cost of sales<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2db y515 w1ef h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-513<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2dc y515 w1f0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-612<span class=\"_ _1a9\"> </span></div></td></tr></table>The license rights on sales include the r<span class=\"_ _4\"></span>oyalties that Oxurion ow<span class=\"_ _4\"></span>es to the companies RCT and LSRP on the basis of JETREA\u00ae sales. 5.6.<span class=\"_ _3\"></span>3<span class=\"_ _3\"></span> <span class=\"_ _67\"> </span><span class=\"ls34 ws0\">Resear<span class=\"_ _4\"></span>ch and dev<span class=\"_ _4\"></span>elopmen<span class=\"_ _4\"></span>t expenses<span class=\"_ _1a9\"> </span></span><table class=\"s w1d5 h52\" id=\"_bca3b4a4-f263-4a7d-8730-5f4a7f135906\"><tr><td class=\"c n xf0 y5ee w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2de y5ee w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y5ee w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ef w1f2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e0 y5ef w1f3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3<span class=\"_ _4\"></span>,231<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e1 y5ef w1f4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,900<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f0 w1f5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Subcontracted R&amp;D activities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e2 y5f0 w1f6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-10<span class=\"_ _4\"></span>,668<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e3 y5f0 w1f7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-11<span class=\"_ _4\"></span>,451<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f1 w1f8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Reagents and materials<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e4 y5f1 w1f9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-88<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e5 y5f1 w1fa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-419<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f2 w1fb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Patent expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e6 y5f2 w1fc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-107<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e7 y5f2 w1ec h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-279<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f3 w1fd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Consultancy fees<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e8 y5f3 w1fe h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,2<span class=\"_ _4\"></span>46<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e9 y5f3 w1ff h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1,984<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y569 w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ea y569 w200 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-389<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2eb y569 w201 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-260<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w202 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Depreciation and amortization<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ec y56a w203 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-307<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ed y56a w204 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-584<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w205 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Government grants<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ee y56b w6b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ef y56b w206 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">84<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w207 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Income from recharge of costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f0 y5ba w208 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">47<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f1 y5ba w209 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">97<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w20a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal research and development expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f2 y515 w20b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-15<span class=\"_ _4\"></span>,986<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f3 y515 w20c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-20<span class=\"_ _4\"></span>,696<span class=\"_ _1a9\"> </span></div></td></tr></table>The decrease in emp<span class=\"_ _4\"></span>loy<span class=\"_ _4\"></span>ee benefits in 2022 compared to 2021 is mainly the result of the decision of the Compan<span class=\"_ _4\"></span>y taken in 2021 to reduce the headcount to focus on its c<span class=\"_ _4\"></span>linical assets,<span class=\"_ _1\"></span> hence the severance attributable to these reductions wer<span class=\"_ _4\"></span>e included in 2021<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The subcontracted R&amp;D activities r<span class=\"_ _4\"></span>elate to the outsourced ser<span class=\"_ _3\"></span>vices used to develop Oxurion\u2019<span class=\"_ _25\"></span>s projects in the preclinical and clinical phase<span class=\"_ _4\"></span>. The costs in 2021 and 2022 are mainl<span class=\"_ _4\"></span>y the cost related to the THR-149 and THR-687<span class=\"_ _1\"></span> clinical studies.<span class=\"_ _1a9\"> </span>In 2022,<span class=\"_ _4\"></span> other expenses w<span class=\"_ _4\"></span>ere 0<span class=\"_ _25\"></span>.4 million euro compared to<span class=\"_ _3\"></span> 0<span class=\"_ _1\"></span>.3 million euro in 2021<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The go<span class=\"_ _4\"></span>vernment grants ar<span class=\"_ _4\"></span>e grants received from the <span class=\"_ _4\"></span>VLAIO<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> formerly kno<span class=\"_ _4\"></span>wn as IWT<span class=\"_ _25\"></span>. Oxurion currently has no gr<span class=\"_ _4\"></span>ant agreement with VLAIO<span class=\"_ _25\"></span>. These grants are pro<span class=\"_ _4\"></span>vided to Oxurion to support cer<span class=\"_ _3\"></span>tain R&amp;D activities. W<span class=\"_ _4\"></span>e ref<span class=\"_ _4\"></span>er to the accounting policy in note 5<span class=\"_ _1\"></span>.5<span class=\"_ _4\"></span>.3<span class=\"_ _1\"></span>.<span class=\"_ _3\"></span> Over the course of the project,<span class=\"_ _1\"></span> Oxurion repor<span class=\"_ _3\"></span>ts on the status of<span class=\"_ _3\"></span> activities and incurred expenditur<span class=\"_ _4\"></span>e to VLAIO on a regular basis to receive grant ad<span class=\"_ _4\"></span>vances. As suc<span class=\"_ _4\"></span>h Oxurion and VLAIO follo<span class=\"_ _4\"></span>w up over the course of the pr<span class=\"_ _4\"></span>ojects that all activities performed<span class=\"_ _3\"></span> will not deviate from the agreed scope and that the final gr<span class=\"_ _4\"></span>ant amount will not deviate from the initially agreed amounts<span class=\"_ _4\"></span>. Overall,<span class=\"_ _4\"></span> Oxurion is confident that the reasonab<span class=\"_ _4\"></span>le assurance as defined in the standard is reac<span class=\"_ _4\"></span>hed over the course of the project for the amounts spent up to that moment,<span class=\"_ _1\"></span> as the only<span class=\"_ _3\"></span> condition attached to the grant is to perform R&amp;D activities in<span class=\"_ _1a9\"> </span>ine with the agreed-upon scope and in line with the set b<span class=\"_ _4\"></span>udget and maintain a presence in the same reg<span class=\"_ _4\"></span>ion. There ar<span class=\"_ _4\"></span>e no other conditions attached to the grants and the outcome of R&amp;D activities does not impact the decision of VLAIO whether the final grant will be received or not. Government gr<span class=\"_ _4\"></span>ants that compensate the Company for expenses incurred and income from the r<span class=\"_ _4\"></span>echarge of costs ar<span class=\"_ _4\"></span>e deducted from the researc<span class=\"_ _4\"></span>h and development expenses on a systematic basis in the same period in which the expenses are incurr<span class=\"_ _4\"></span>ed<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.6<span class=\"_ _3\"></span>.4<span class=\"_ _3\"></span> <span class=\"_ _5b\"> </span><span class=\"ls0 ws0\">General and admini<span class=\"_ _4\"></span>stra<span class=\"_ _4\"></span>tiv<span class=\"_ _4\"></span>e expenses<span class=\"_ _1a9\"> </span></span><table class=\"s w20d h53\" id=\"_b5ce43ae-68f0-487a-95f1-a7417e739e04\"><tr><td class=\"c n xf0 y5f4 w114 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f4 y5f4 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y5f4 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f3 w20e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e0 y5f3 w20f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,753<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f5 y5f3 w210 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-2,653<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y569 w1fd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Consultancy fees<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f6 y569 w211 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3<span class=\"_ _4\"></span>,14<span class=\"_ _4\"></span>1<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f7 y569 w133 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3,470<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w212 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Insurance<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f8 y56a w213 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-361<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f9 y56a w214 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-343<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2fa y56b w215 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-692<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2fb y56b w145 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-622<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w216 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Depreciation and amortization<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2fc y5ba w217 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-33<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2fd y5ba w1e9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-62<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w218 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal general and administrative expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2fe y515 w219 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,980<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ff y515 w21a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-7<span class=\"_ _1\"></span>,150<span class=\"_ _1a9\"> </span></div></td></tr></table>The most important piece of the general and administra<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tive expenses are ICT contractor<span class=\"_ _4\"></span>s,<span class=\"_ _1\"></span> management, audit fees<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> Board of Directors<span class=\"_ _1\"></span>\u2019 fees,<span class=\"_ _4\"></span> investor r<span class=\"_ _4\"></span>elations contractors<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> legal and funding fees and HR ser<span class=\"_ _3\"></span>vices. 5.6.<span class=\"_ _3\"></span>5<span class=\"_ _3\"></span> <span class=\"_ _5a\"> </span><span class=\"ls18 ws95\">Selling exp<span class=\"_ _3\"></span>enses<span class=\"_ _1a9\"> </span></span><table class=\"s w21b h54\" id=\"_cb1253b5-b78b-443d-8f6d-db5c64901550\"><tr><td class=\"c n xf0 y5f5 w114 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f4 y5f5 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y5f5 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f6 w20e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x300 y5f6 w21c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-608<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x301 y5f6 w21d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-975<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f7 w21e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Distribution costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x302 y5f7 w21f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-68<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x303 y5f7 w220 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-91<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f8 w221 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Contractor and consultancy fees<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x304 y5f8 w222 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls4d ws252\">-<span class=\"_ _3\"></span>241<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x305 y5f8 w223 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-296<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f9 w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x306 y5f9 w224 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-183<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x307 y5f9 w225 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-116<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5fa w216 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Depreciation and amortization<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x308 y5fa w226 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-15<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x309 y5fa w227 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">-31<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5fb w228 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Income from recharge of costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x30a y5fb w229 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">223<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x30b y5fb w22a h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">235<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w22b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal selling expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x30c y515 w22c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-892<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x30d y515 w22d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,27<span class=\"_ _1\"></span>4<span class=\"_ _1a9\"> </span></div></td></tr></table>In 2022,<span class=\"_ _4\"></span> the selling expenses of Oxurion w<span class=\"_ _4\"></span>ere 0<span class=\"_ _25\"></span>.9 million euro compared to 1<span class=\"_ _1\"></span>.3 million euro in 2021<span class=\"_ _4\"></span>. The decrease is mainly a continuing effect of the outlicensing of JETREA\u00ae to Inceptua.<span class=\"_ _1a9\"> </span>5.6.<span class=\"_ _3\"></span>8<span class=\"_ _3\"></span> <span class=\"_ _7f\"> </span><span class=\"ls3a ws95\">Finance expense<span class=\"_ _1a9\"> </span></span><table class=\"s w23a h57\" id=\"_3bd01f28-c0bc-4c8b-a544-2655691baabf\"><tr><td class=\"c n xf0 y601 w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2de y601 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y601 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y602 w23b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Bank costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x319 y602 w23c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-21<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31a y602 w23d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-26<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y603 w23e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Impairment on short-term financial investments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31b y603 w226 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-15<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31c y603 w23f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y604 w234 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>air value adjustment convertible bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31d y604 w240 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-7<span class=\"_ _25\"></span>,824<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31e y604 w241 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-372<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y605 w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31f y605 w242 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,349<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x320 y605 w243 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-713<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y606 w244 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Exchange rate loss (on USD and GBP)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x321 y606 w1fc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-170<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x322 y606 w1d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-152<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w245 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal finance expense<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x323 y515 w246 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-9<span class=\"_ _1\"></span>,379<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x324 y515 w247 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-1<span class=\"_ _1\"></span>,268<span class=\"_ _1a9\"> </span></div></td></tr></table>The fair value adjustment con<span class=\"_ _4\"></span>vertible bonds relate for 7<span class=\"_ _25\"></span>.824 million euro to the Negma convertible bond (2021: 0<span class=\"_ _1\"></span>.347<span class=\"_ _4\"></span> million euro)<span class=\"_ _4\"></span>. W<span class=\"_ _1\"></span>e refer to note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.11 for more information<span class=\"_ _1a9\"> </span>The other financial expenses relate f<span class=\"_ _4\"></span>or 0<span class=\"_ _1\"></span>.700 million euro to the Negma convertible bond (2021: 0<span class=\"_ _1\"></span>.525 million euro)<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 0<span class=\"_ _1\"></span>.636 million euro to the Kreos/P<span class=\"_ _4\"></span>ontifax convertible bond (2021: 0<span class=\"_ _1\"></span>.177 million eur<span class=\"_ _4\"></span>o) and 0<span class=\"_ _1\"></span>.013 million euro to other (2021: 0<span class=\"_ _1\"></span>.011 million euro)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>As a result of USD revaluations<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the unr<span class=\"_ _4\"></span>ealized exchange losses in 2022 amounted to 0<span class=\"_ _1\"></span>.004 million euro (2021: 0<span class=\"_ _1\"></span>.138 million euro) whereas 0<span class=\"_ _25\"></span>.166 million euro exchange losses wer<span class=\"_ _4\"></span>e realized (2021: 0<span class=\"_ _1\"></span>.014 million euro<span class=\"_ _1a9\"> </span>)<span class=\"_ _1a9\"> </span><span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>5.6.<span class=\"_ _3\"></span>9<span class=\"_ _3\"></span> <span class=\"_ _7f\"> </span><span class=\"ls21 ws27\">E<span class=\"_ _4\"></span>mploy<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></span><table class=\"s w25d h59\" id=\"_6d6b2b26-2099-4022-b6ef-1e0c711364f6\"><tr><td class=\"c n xf0 y608 w114 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f4 y608 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y608 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y609 w25e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Wages<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> salaries and bonuses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x339 y609 w25f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-4,456<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33a y609 w260 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-8<span class=\"_ _4\"></span>,030<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y60a w261 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Share-based compensation expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33b y60a w262 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-933<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33c y60a w263 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,107<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y60b w264 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Pension costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33d y60b w11b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-203<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33e y60b w213 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-391<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y60c w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33f y60c w111 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,592<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x340 y60c w265 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-9<span class=\"_ _4\"></span>,528<span class=\"_ _1a9\"> </span></div></td></tr></table>The pension costs included in the tab<span class=\"_ _4\"></span>le above consist f<span class=\"_ _4\"></span>or 0<span class=\"_ _1\"></span>.149 million euro (2021: 0<span class=\"_ _1\"></span>.37<span class=\"_ _25\"></span>4 million euro) of costs related to defined benefit plans and for 0<span class=\"_ _25\"></span>.054 million euro (2021:<span class=\"_ _3\"></span> 0<span class=\"_ _1\"></span>.017<span class=\"_ _4\"></span> million euro) of costs r<span class=\"_ _4\"></span>elated to defined contribution plans<span class=\"_ _4\"></span>. W<span class=\"_ _4\"></span>e ref<span class=\"_ _4\"></span>er to note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.9 for more information on the defined benefit plans<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The aver<span class=\"_ _4\"></span>age number of full<span class=\"_ _4\"></span>-time equivalents (including executive directors) w<span class=\"_ _4\"></span>as as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span><table class=\"s w248 h58\" id=\"_9a2c8cf0-85c2-4780-ae1e-11189846e6c9\"><tr><td class=\"c n xf0 y607 w249 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN NUMBERS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x325 y607 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x326 y607 w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w24a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Research and development<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x327 y56a w208 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">27<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x328 y56a w24b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">45<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w24c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">General and administration<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x329 y56b w1bb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32a y56b w24d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">10<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w24e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Selling<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32b y5ba w24f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32c y5ba w250 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32d y515 w252 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">35<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32e y515 w253 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">56<span class=\"_ _1a9\"> </span></div></td></tr></table>The share-based compensation expense inc<span class=\"_ _4\"></span>luded in the statement of profit and loss is given belo<span class=\"_ _4\"></span>w:<span class=\"_ _1a9\"> </span><table class=\"s w254 h58\" id=\"_d35bd503-5f9f-4345-95ba-b173b45e2916\"><tr><td class=\"c n x129 y607 w6d h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">N '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32f y607 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x330 y607 w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w255 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Research and development expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x331 y56a w256 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">427<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x332 y56a w257 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">289<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w258 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">General and administrative expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x333 y56b w1d7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">495<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x334 y56b w259 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">798<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w7f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Selling expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x335 y5ba w25a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">11<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x336 y5ba wcc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">20<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x337 y515 w25b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">933<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x338 y515 w25c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,107<span class=\"_ _1a9\"> </span></div></td></tr></table>W<span class=\"_ _4\"></span>e refer to note 5<span class=\"_ _1\"></span>.7<span class=\"_ _25\"></span>.8<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> for fur<span class=\"_ _3\"></span>ther information regarding the share-based payment plans<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5<span class=\"_ _3\"></span>.<span class=\"_ _23\"></span>6<span class=\"_ _23\"></span>.1<span class=\"_ _23\"></span>0<span class=\"_ _23\"></span> <span class=\"_ _78\"> </span><span class=\"ls51 ws256\">Ta<span class=\"_ _5\"></span>x<span class=\"_ _27\"></span>e<span class=\"_ _5\"></span>s<span class=\"_ _1a9\"> </span></span><table class=\"s w266 h58\" id=\"_b75957b9-00c9-4408-9e74-576722d78596\"><tr><td class=\"c n xf0 y607 w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x341 y607 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x342 y607 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w267 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Current tax expense<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x343 y56a w14d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x344 y56a w9c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w268 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Deferred tax expense<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x345 y56b wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x346 y56b w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y518 w269 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax expenses in income statement<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x347 y518 w26a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x348 y518 w26b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-3<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w26c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">Effective tax rate<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x349 y515 w26d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1\"></span>.0%<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x34a y515 w26d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1\"></span>.0%<span class=\"_ _1a9\"> </span></div></td></tr></table>The tax expense as sho<span class=\"_ _4\"></span>wn above has been calculated in conformity with local and international tax laws<span class=\"_ _4\"></span>. The tax on the Company\u2019<span class=\"_ _1\"></span>s loss (-)/ profit befor<span class=\"_ _4\"></span>e tax differs from the theoretical amount that w<span class=\"_ _4\"></span>ould arise using the domestic rate in Belgium on loss (-) / profit of <span class=\"_ _4\"></span>the year and is as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span><table class=\"s w26e h5a\" id=\"_9c6df2dc-19b0-4470-a922-7f5ee064c6fa\"><tr><td class=\"c n xf0 y60d w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2de y60d w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y60d w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y60e w26f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Loss (-) / profit before tax<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x34b y60e w270 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-31<span class=\"_ _4\"></span>,686<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x34c y60e w271 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-29<span class=\"_ _4\"></span>,592<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x34d h13 y60f ff1 fsc fc7 sc0 ls0 ws0\">Expected tax based on tax rate of the parent </td><td class=\"c n x34e y610 w272 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,921<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x34f y610 w1a0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,398<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x34d h13 y611 ff1 fsc fc7 sc0 ls0 ws0\">company (25% - theoretical)<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y612 w273 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Disallowed expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e6 y612 w274 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-231<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x350 y612 w226 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-51<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y613 w275 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax deductions and non-taxable income<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x351 y613 w132 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">152<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x352 y613 w175 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">144<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y614 w276 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Change in unrecognized deferred taxes<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x353 y614 w277 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,961<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x354 y614 w278 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-9<span class=\"_ _4\"></span>,947<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y517 w279 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Difference in tax rates from other jurisdictions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x355 y517 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x356 y517 w150 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-6<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y518 w27a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Permanent differences<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x357 y518 w27b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,888<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x358 y518 w27c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,459<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w27d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax expense of the year (effective)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x359 y515 w14d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x35a y515 w151 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3<span class=\"_ _1a9\"> </span></div></td></tr></table>The main differ<span class=\"_ _4\"></span>ence between the theoretical tax and the effective tax for the y<span class=\"_ _4\"></span>ear 2021 and 2022 can be primarily explained b<span class=\"_ _4\"></span>y the unrecognized deferr<span class=\"_ _4\"></span>ed taxes for which the Company conservatively assesses that it is not likely that these will be utilized in the foreseeab<span class=\"_ _4\"></span>le future<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfExpensesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-21": {
   "value": "5.6.<span class=\"_ _23\"></span>2<span class=\"_ _3\"></span> <span class=\"_ _69\"> </span><span class=\"ls4f ws1ae\">C<span class=\"_ _3\"></span>ost<span class=\"_ _3\"></span> of s<span class=\"_ _3\"></span>ale<span class=\"_ _3\"></span>s<span class=\"_ _1a9\"> </span></span><table class=\"s w1e7 h51\" id=\"_d0b5ecdc-e081-4a59-a049-3fcc2557c797\"><tr><td class=\"c n xf0 y5ed w114 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2cf y5ed w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d0 y5ed w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w1e8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">License rights on sales<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d7 y56b w1e9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-46<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d8 y56b w1ea h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-48<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w1eb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Cost of goods<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2d9 y5ba w1ec h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-467<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2da y5ba w1ed h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-564<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w1ee h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal cost of sales<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2db y515 w1ef h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-513<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2dc y515 w1f0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-612<span class=\"_ _1a9\"> </span></div></td></tr></table>The license rights on sales include the r<span class=\"_ _4\"></span>oyalties that Oxurion ow<span class=\"_ _4\"></span>es to the companies RCT and LSRP on the basis of JETREA\u00ae sales. 5.6.<span class=\"_ _3\"></span>3<span class=\"_ _3\"></span> <span class=\"_ _67\"> </span><span class=\"ls34 ws0\">Resear<span class=\"_ _4\"></span>ch and dev<span class=\"_ _4\"></span>elopmen<span class=\"_ _4\"></span>t expenses<span class=\"_ _1a9\"> </span></span><table class=\"s w1d5 h52\" id=\"_bca3b4a4-f263-4a7d-8730-5f4a7f135906\"><tr><td class=\"c n xf0 y5ee w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2de y5ee w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y5ee w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ef w1f2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e0 y5ef w1f3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3<span class=\"_ _4\"></span>,231<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e1 y5ef w1f4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,900<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f0 w1f5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Subcontracted R&amp;D activities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e2 y5f0 w1f6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-10<span class=\"_ _4\"></span>,668<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e3 y5f0 w1f7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-11<span class=\"_ _4\"></span>,451<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f1 w1f8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Reagents and materials<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e4 y5f1 w1f9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-88<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e5 y5f1 w1fa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-419<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f2 w1fb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Patent expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e6 y5f2 w1fc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-107<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e7 y5f2 w1ec h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-279<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f3 w1fd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Consultancy fees<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e8 y5f3 w1fe h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,2<span class=\"_ _4\"></span>46<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e9 y5f3 w1ff h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1,984<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y569 w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ea y569 w200 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-389<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2eb y569 w201 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-260<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w202 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Depreciation and amortization<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ec y56a w203 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-307<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ed y56a w204 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-584<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w205 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Government grants<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ee y56b w6b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ef y56b w206 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">84<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w207 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Income from recharge of costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f0 y5ba w208 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">47<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f1 y5ba w209 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">97<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w20a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal research and development expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f2 y515 w20b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-15<span class=\"_ _4\"></span>,986<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f3 y515 w20c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-20<span class=\"_ _4\"></span>,696<span class=\"_ _1a9\"> </span></div></td></tr></table>The decrease in emp<span class=\"_ _4\"></span>loy<span class=\"_ _4\"></span>ee benefits in 2022 compared to 2021 is mainly the result of the decision of the Compan<span class=\"_ _4\"></span>y taken in 2021 to reduce the headcount to focus on its c<span class=\"_ _4\"></span>linical assets,<span class=\"_ _1\"></span> hence the severance attributable to these reductions wer<span class=\"_ _4\"></span>e included in 2021<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The subcontracted R&amp;D activities r<span class=\"_ _4\"></span>elate to the outsourced ser<span class=\"_ _3\"></span>vices used to develop Oxurion\u2019<span class=\"_ _25\"></span>s projects in the preclinical and clinical phase<span class=\"_ _4\"></span>. The costs in 2021 and 2022 are mainl<span class=\"_ _4\"></span>y the cost related to the THR-149 and THR-687<span class=\"_ _1\"></span> clinical studies.<span class=\"_ _1a9\"> </span>In 2022,<span class=\"_ _4\"></span> other expenses w<span class=\"_ _4\"></span>ere 0<span class=\"_ _25\"></span>.4 million euro compared to<span class=\"_ _3\"></span> 0<span class=\"_ _1\"></span>.3 million euro in 2021<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The go<span class=\"_ _4\"></span>vernment grants ar<span class=\"_ _4\"></span>e grants received from the <span class=\"_ _4\"></span>VLAIO<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> formerly kno<span class=\"_ _4\"></span>wn as IWT<span class=\"_ _25\"></span>. Oxurion currently has no gr<span class=\"_ _4\"></span>ant agreement with VLAIO<span class=\"_ _25\"></span>. These grants are pro<span class=\"_ _4\"></span>vided to Oxurion to support cer<span class=\"_ _3\"></span>tain R&amp;D activities. W<span class=\"_ _4\"></span>e ref<span class=\"_ _4\"></span>er to the accounting policy in note 5<span class=\"_ _1\"></span>.5<span class=\"_ _4\"></span>.3<span class=\"_ _1\"></span>.<span class=\"_ _3\"></span> Over the course of the project,<span class=\"_ _1\"></span> Oxurion repor<span class=\"_ _3\"></span>ts on the status of<span class=\"_ _3\"></span> activities and incurred expenditur<span class=\"_ _4\"></span>e to VLAIO on a regular basis to receive grant ad<span class=\"_ _4\"></span>vances. As suc<span class=\"_ _4\"></span>h Oxurion and VLAIO follo<span class=\"_ _4\"></span>w up over the course of the pr<span class=\"_ _4\"></span>ojects that all activities performed<span class=\"_ _3\"></span> will not deviate from the agreed scope and that the final gr<span class=\"_ _4\"></span>ant amount will not deviate from the initially agreed amounts<span class=\"_ _4\"></span>. Overall,<span class=\"_ _4\"></span> Oxurion is confident that the reasonab<span class=\"_ _4\"></span>le assurance as defined in the standard is reac<span class=\"_ _4\"></span>hed over the course of the project for the amounts spent up to that moment,<span class=\"_ _1\"></span> as the only<span class=\"_ _3\"></span> condition attached to the grant is to perform R&amp;D activities in<span class=\"_ _1a9\"> </span>ine with the agreed-upon scope and in line with the set b<span class=\"_ _4\"></span>udget and maintain a presence in the same reg<span class=\"_ _4\"></span>ion. There ar<span class=\"_ _4\"></span>e no other conditions attached to the grants and the outcome of R&amp;D activities does not impact the decision of VLAIO whether the final grant will be received or not. Government gr<span class=\"_ _4\"></span>ants that compensate the Company for expenses incurred and income from the r<span class=\"_ _4\"></span>echarge of costs ar<span class=\"_ _4\"></span>e deducted from the researc<span class=\"_ _4\"></span>h and development expenses on a systematic basis in the same period in which the expenses are incurr<span class=\"_ _4\"></span>ed<span class=\"_ _1a9\"> </span><span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.6.<span class=\"_ _3\"></span>8<span class=\"_ _3\"></span> <span class=\"_ _7f\"> </span><span class=\"ls3a ws95\">Finance expense<span class=\"_ _1a9\"> </span></span><table class=\"s w23a h57\" id=\"_3bd01f28-c0bc-4c8b-a544-2655691baabf\"><tr><td class=\"c n xf0 y601 w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2de y601 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y601 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y602 w23b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Bank costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x319 y602 w23c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-21<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31a y602 w23d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-26<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y603 w23e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Impairment on short-term financial investments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31b y603 w226 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-15<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31c y603 w23f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y604 w234 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>air value adjustment convertible bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31d y604 w240 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-7<span class=\"_ _25\"></span>,824<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31e y604 w241 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-372<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y605 w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x31f y605 w242 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,349<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x320 y605 w243 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-713<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y606 w244 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Exchange rate loss (on USD and GBP)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x321 y606 w1fc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-170<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x322 y606 w1d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-152<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w245 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal finance expense<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x323 y515 w246 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-9<span class=\"_ _1\"></span>,379<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x324 y515 w247 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-1<span class=\"_ _1\"></span>,268<span class=\"_ _1a9\"> </span></div></td></tr></table>The fair value adjustment con<span class=\"_ _4\"></span>vertible bonds relate for 7<span class=\"_ _25\"></span>.824 million euro to the Negma convertible bond (2021: 0<span class=\"_ _1\"></span>.347<span class=\"_ _4\"></span> million euro)<span class=\"_ _4\"></span>. W<span class=\"_ _1\"></span>e refer to note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.11 for more information<span class=\"_ _1a9\"> </span>The other financial expenses relate f<span class=\"_ _4\"></span>or 0<span class=\"_ _1\"></span>.700 million euro to the Negma convertible bond (2021: 0<span class=\"_ _1\"></span>.525 million euro)<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 0<span class=\"_ _1\"></span>.636 million euro to the Kreos/P<span class=\"_ _4\"></span>ontifax convertible bond (2021: 0<span class=\"_ _1\"></span>.177 million eur<span class=\"_ _4\"></span>o) and 0<span class=\"_ _1\"></span>.013 million euro to other (2021: 0<span class=\"_ _1\"></span>.011 million euro)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>As a result of USD revaluations<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the unr<span class=\"_ _4\"></span>ealized exchange losses in 2022 amounted to 0<span class=\"_ _1\"></span>.004 million euro (2021: 0<span class=\"_ _1\"></span>.138 million euro) whereas 0<span class=\"_ _25\"></span>.166 million euro exchange losses wer<span class=\"_ _4\"></span>e realized (2021: 0<span class=\"_ _1\"></span>.014 million euro<span class=\"_ _1a9\"> </span>)<span class=\"_ _1a9\"> </span><span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>5.6.<span class=\"_ _3\"></span>9<span class=\"_ _3\"></span> <span class=\"_ _7f\"> </span><span class=\"ls21 ws27\">E<span class=\"_ _4\"></span>mploy<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></span><table class=\"s w25d h59\" id=\"_6d6b2b26-2099-4022-b6ef-1e0c711364f6\"><tr><td class=\"c n xf0 y608 w114 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f4 y608 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y608 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y609 w25e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Wages<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> salaries and bonuses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x339 y609 w25f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-4,456<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33a y609 w260 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-8<span class=\"_ _4\"></span>,030<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y60a w261 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Share-based compensation expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33b y60a w262 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-933<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33c y60a w263 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,107<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y60b w264 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Pension costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33d y60b w11b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-203<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33e y60b w213 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-391<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y60c w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33f y60c w111 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,592<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x340 y60c w265 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-9<span class=\"_ _4\"></span>,528<span class=\"_ _1a9\"> </span></div></td></tr></table>The pension costs included in the tab<span class=\"_ _4\"></span>le above consist f<span class=\"_ _4\"></span>or 0<span class=\"_ _1\"></span>.149 million euro (2021: 0<span class=\"_ _1\"></span>.37<span class=\"_ _25\"></span>4 million euro) of costs related to defined benefit plans and for 0<span class=\"_ _25\"></span>.054 million euro (2021:<span class=\"_ _3\"></span> 0<span class=\"_ _1\"></span>.017<span class=\"_ _4\"></span> million euro) of costs r<span class=\"_ _4\"></span>elated to defined contribution plans<span class=\"_ _4\"></span>. W<span class=\"_ _4\"></span>e ref<span class=\"_ _4\"></span>er to note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.9 for more information on the defined benefit plans<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The aver<span class=\"_ _4\"></span>age number of full<span class=\"_ _4\"></span>-time equivalents (including executive directors) w<span class=\"_ _4\"></span>as as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span><table class=\"s w248 h58\" id=\"_9a2c8cf0-85c2-4780-ae1e-11189846e6c9\"><tr><td class=\"c n xf0 y607 w249 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN NUMBERS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x325 y607 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x326 y607 w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w24a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Research and development<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x327 y56a w208 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">27<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x328 y56a w24b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">45<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w24c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">General and administration<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x329 y56b w1bb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32a y56b w24d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">10<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w24e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Selling<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32b y5ba w24f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32c y5ba w250 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32d y515 w252 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">35<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32e y515 w253 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">56<span class=\"_ _1a9\"> </span></div></td></tr></table>The share-based compensation expense inc<span class=\"_ _4\"></span>luded in the statement of profit and loss is given belo<span class=\"_ _4\"></span>w:<span class=\"_ _1a9\"> </span><table class=\"s w254 h58\" id=\"_d35bd503-5f9f-4345-95ba-b173b45e2916\"><tr><td class=\"c n x129 y607 w6d h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">N '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32f y607 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x330 y607 w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w255 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Research and development expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x331 y56a w256 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">427<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x332 y56a w257 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">289<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w258 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">General and administrative expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x333 y56b w1d7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">495<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x334 y56b w259 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">798<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w7f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Selling expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x335 y5ba w25a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">11<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x336 y5ba wcc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">20<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x337 y515 w25b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">933<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x338 y515 w25c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,107<span class=\"_ _1a9\"> </span></div></td></tr></table>W<span class=\"_ _4\"></span>e refer to note 5<span class=\"_ _1\"></span>.7<span class=\"_ _25\"></span>.8<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> for fur<span class=\"_ _3\"></span>ther information regarding the share-based payment plans<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5<span class=\"_ _3\"></span>.<span class=\"_ _23\"></span>6<span class=\"_ _23\"></span>.1<span class=\"_ _23\"></span>0<span class=\"_ _23\"></span> <span class=\"_ _78\"> </span><span class=\"ls51 ws256\">Ta<span class=\"_ _5\"></span>x<span class=\"_ _27\"></span>e<span class=\"_ _5\"></span>s<span class=\"_ _1a9\"> </span></span><table class=\"s w266 h58\" id=\"_b75957b9-00c9-4408-9e74-576722d78596\"><tr><td class=\"c n xf0 y607 w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x341 y607 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x342 y607 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w267 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Current tax expense<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x343 y56a w14d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x344 y56a w9c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w268 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Deferred tax expense<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x345 y56b wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x346 y56b w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y518 w269 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax expenses in income statement<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x347 y518 w26a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x348 y518 w26b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-3<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w26c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">Effective tax rate<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x349 y515 w26d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1\"></span>.0%<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x34a y515 w26d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1\"></span>.0%<span class=\"_ _1a9\"> </span></div></td></tr></table>The tax expense as sho<span class=\"_ _4\"></span>wn above has been calculated in conformity with local and international tax laws<span class=\"_ _4\"></span>. The tax on the Company\u2019<span class=\"_ _1\"></span>s loss (-)/ profit befor<span class=\"_ _4\"></span>e tax differs from the theoretical amount that w<span class=\"_ _4\"></span>ould arise using the domestic rate in Belgium on loss (-) / profit of <span class=\"_ _4\"></span>the year and is as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span><table class=\"s w26e h5a\" id=\"_9c6df2dc-19b0-4470-a922-7f5ee064c6fa\"><tr><td class=\"c n xf0 y60d w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2de y60d w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y60d w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y60e w26f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Loss (-) / profit before tax<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x34b y60e w270 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-31<span class=\"_ _4\"></span>,686<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x34c y60e w271 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-29<span class=\"_ _4\"></span>,592<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x34d h13 y60f ff1 fsc fc7 sc0 ls0 ws0\">Expected tax based on tax rate of the parent </td><td class=\"c n x34e y610 w272 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,921<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x34f y610 w1a0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,398<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x34d h13 y611 ff1 fsc fc7 sc0 ls0 ws0\">company (25% - theoretical)<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y612 w273 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Disallowed expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e6 y612 w274 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-231<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x350 y612 w226 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-51<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y613 w275 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax deductions and non-taxable income<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x351 y613 w132 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">152<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x352 y613 w175 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">144<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y614 w276 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Change in unrecognized deferred taxes<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x353 y614 w277 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,961<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x354 y614 w278 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-9<span class=\"_ _4\"></span>,947<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y517 w279 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Difference in tax rates from other jurisdictions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x355 y517 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x356 y517 w150 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-6<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y518 w27a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Permanent differences<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x357 y518 w27b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,888<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x358 y518 w27c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,459<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w27d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax expense of the year (effective)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x359 y515 w14d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x35a y515 w151 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3<span class=\"_ _1a9\"> </span></div></td></tr></table>The main differ<span class=\"_ _4\"></span>ence between the theoretical tax and the effective tax for the y<span class=\"_ _4\"></span>ear 2021 and 2022 can be primarily explained b<span class=\"_ _4\"></span>y the unrecognized deferr<span class=\"_ _4\"></span>ed taxes for which the Company conservatively assesses that it is not likely that these will be utilized in the foreseeab<span class=\"_ _4\"></span>le future<span class=\"_ _1a9\"> </span>5.6.<span class=\"_ _3\"></span>5<span class=\"_ _3\"></span> <span class=\"_ _5a\"> </span><span class=\"ls18 ws95\">Selling exp<span class=\"_ _3\"></span>enses<span class=\"_ _1a9\"> </span></span><table class=\"s w21b h54\" id=\"_cb1253b5-b78b-443d-8f6d-db5c64901550\"><tr><td class=\"c n xf0 y5f5 w114 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f4 y5f5 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y5f5 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f6 w20e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x300 y5f6 w21c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-608<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x301 y5f6 w21d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-975<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f7 w21e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Distribution costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x302 y5f7 w21f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-68<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x303 y5f7 w220 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-91<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f8 w221 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Contractor and consultancy fees<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x304 y5f8 w222 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls4d ws252\">-<span class=\"_ _3\"></span>241<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x305 y5f8 w223 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-296<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f9 w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x306 y5f9 w224 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-183<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x307 y5f9 w225 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-116<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5fa w216 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Depreciation and amortization<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x308 y5fa w226 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-15<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x309 y5fa w227 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">-31<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5fb w228 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">Income from recharge of costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x30a y5fb w229 h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">223<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x30b y5fb w22a h46\"><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">235<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w22b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal selling expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x30c y515 w22c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-892<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x30d y515 w22d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,27<span class=\"_ _1\"></span>4<span class=\"_ _1a9\"> </span></div></td></tr></table>In 2022,<span class=\"_ _4\"></span> the selling expenses of Oxurion w<span class=\"_ _4\"></span>ere 0<span class=\"_ _25\"></span>.9 million euro compared to 1<span class=\"_ _1\"></span>.3 million euro in 2021<span class=\"_ _4\"></span>. The decrease is mainly a continuing effect of the outlicensing of JETREA\u00ae to Inceptua",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAttributionOfExpensesByNatureToTheirFunctionExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-44": {
   "value": "<div class=\"t m0 hd ff3 fs8 fc4 sc0 ls33 ws1c4 gs14b\">5.6.<span class=\"_ _3\"></span>3<span class=\"_ _3\"></span> <span class=\"_ _67\"> </span><span class=\"ls34 ws0\">Resear<span class=\"_ _4\"></span>ch and dev<span class=\"_ _4\"></span>elopmen<span class=\"_ _4\"></span>t expenses<span class=\"_ _1a9\"> </span></span></div><div class=\"gs14c\"><table class=\"s w1d5 h52\" id=\"_bca3b4a4-f263-4a7d-8730-5f4a7f135906\"><tr><td class=\"c n xf0 y5ee w1f1 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2de y5ee w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y5ee w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ef w1f2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e0 y5ef w1f3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-3<span class=\"_ _4\"></span>,231<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e1 y5ef w1f4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,900<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f0 w1f5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Subcontracted R&amp;D activities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e2 y5f0 w1f6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-10<span class=\"_ _4\"></span>,668<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e3 y5f0 w1f7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-11<span class=\"_ _4\"></span>,451<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f1 w1f8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Reagents and materials<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e4 y5f1 w1f9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-88<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e5 y5f1 w1fa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-419<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f2 w1fb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Patent expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e6 y5f2 w1fc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-107<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e7 y5f2 w1ec h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-279<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f3 w1fd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Consultancy fees<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e8 y5f3 w1fe h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,2<span class=\"_ _4\"></span>46<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2e9 y5f3 w1ff h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1,984<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y569 w120 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ea y569 w200 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-389<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2eb y569 w201 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-260<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w202 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Depreciation and amortization<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ec y56a w203 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-307<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ed y56a w204 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-584<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w205 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Government grants<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ee y56b w6b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2ef y56b w206 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">84<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w207 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Income from recharge of costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f0 y5ba w208 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">47<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f1 y5ba w209 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">97<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w20a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal research and development expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f2 y515 w20b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-15<span class=\"_ _4\"></span>,986<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f3 y515 w20c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-20<span class=\"_ _4\"></span>,696<span class=\"_ _1a9\"> </span></div></td></tr></table></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws56 gs14d\">The decrease in emp<span class=\"_ _4\"></span>loy<span class=\"_ _4\"></span>ee benefits in 2022 compared to </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws119 gs14e\">2021 is mainly the result of the decision of the Compan<span class=\"_ _4\"></span>y </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws79 gs37\">taken in 2021 to reduce the headcount to focus on its c<span class=\"_ _4\"></span>linical </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws3b gs38\">assets,<span class=\"_ _1\"></span> hence the severance attributable to these reductions </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws0 gs39\">wer<span class=\"_ _4\"></span>e included in 2021<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws18e gs3b\">The subcontracted R&amp;D activities r<span class=\"_ _4\"></span>elate to the outsourced </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws23 gs3c\">ser<span class=\"_ _3\"></span>vices used to develop Oxurion\u2019<span class=\"_ _25\"></span>s projects in the preclinical </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws53 gs3d\">and clinical phase<span class=\"_ _4\"></span>. The costs in 2021 and 2022 are mainl<span class=\"_ _4\"></span>y </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wsdc gs3e\">the cost related to the THR-149 and THR-687<span class=\"_ _1\"></span> clinical studies.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws181 gs40\">In 2022,<span class=\"_ _4\"></span> other expenses w<span class=\"_ _4\"></span>ere 0<span class=\"_ _25\"></span>.4 million euro compared to<span class=\"_ _3\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws0 gs41\">0<span class=\"_ _1\"></span>.3 million euro in 2021<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws58 gs43\">The go<span class=\"_ _4\"></span>vernment grants ar<span class=\"_ _4\"></span>e grants received from the <span class=\"_ _4\"></span>VLAIO<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws17d gs44\">formerly kno<span class=\"_ _4\"></span>wn as IWT<span class=\"_ _25\"></span>. Oxurion currently has no gr<span class=\"_ _4\"></span>ant </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws14f gsae\">agreement with VLAIO<span class=\"_ _25\"></span>. These grants are pro<span class=\"_ _4\"></span>vided to Oxurion </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws36 gs45\">to support cer<span class=\"_ _3\"></span>tain R&amp;D activities. W<span class=\"_ _4\"></span>e ref<span class=\"_ _4\"></span>er to the accounting </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws0 gs46\">policy in note 5<span class=\"_ _1\"></span>.5<span class=\"_ _4\"></span>.3<span class=\"_ _1\"></span>.<span class=\"_ _3\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws7a gs48\">Over the course of the project,<span class=\"_ _1\"></span> Oxurion repor<span class=\"_ _3\"></span>ts on the status of<span class=\"_ _3\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws1b7 gs49\">activities and incurred expenditur<span class=\"_ _4\"></span>e to VLAIO on a regular basis </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wsc5 gs4a\">to receive grant ad<span class=\"_ _4\"></span>vances. As suc<span class=\"_ _4\"></span>h Oxurion and VLAIO follo<span class=\"_ _4\"></span>w </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws1c gs4b\">up over the course of the pr<span class=\"_ _4\"></span>ojects that all activities performed<span class=\"_ _3\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws9b gs4c\">will not deviate from the agreed scope and that the final gr<span class=\"_ _4\"></span>ant </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws171 gs4d\">amount will not deviate from the initially agreed amounts<span class=\"_ _4\"></span>. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wsba gs4e\">Overall,<span class=\"_ _4\"></span> Oxurion is confident that the reasonab<span class=\"_ _4\"></span>le assurance </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws1c4 gs4f\">as defined in the standard is reac<span class=\"_ _4\"></span>hed over the course of the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws183 gs50\">project for the amounts spent up to that moment,<span class=\"_ _1\"></span> as the only<span class=\"_ _3\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws10b gs51\">condition attached to the grant is </div><div class=\"t m7 he ff1 fs9 fc7 sc0 ls15 ws10b gs14f\">to perform R&amp;D activities in<span class=\"_ _1a9\"> </span><span class=\"_ _3\"></span> </div>l<span class=\"_ _1a9\"> </span>ine with the agreed-upon scope and in line with the set b<span class=\"_ _4\"></span>udget and maintain a presence in the same reg<span class=\"_ _4\"></span>ion. There ar<span class=\"_ _4\"></span>e no other conditions attached to the grants and the outcome of R&amp;D activities does not impact the decision of VLAIO whether the final grant will be received or not. Government gr<span class=\"_ _4\"></span>ants that compensate the Company for expenses incurred and income from the r<span class=\"_ _4\"></span>echarge of costs ar<span class=\"_ _4\"></span>e deducted from the researc<span class=\"_ _4\"></span>h and development expenses on a systematic basis in the same period in which the expenses are incurr<span class=\"_ _4\"></span>ed<span class=\"_ _1a9\"> </span>Research and Development Agr<span class=\"_ _4\"></span>eements<span class=\"_ _1a9\"> </span>Bicycle Ther<span class=\"_ _4\"></span>apeutics<span class=\"_ _1a9\"> </span>In August 2013<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion entered into a resear<span class=\"_ _4\"></span>ch collabor<span class=\"_ _4\"></span>a<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tion and license agreement with Bicy<span class=\"_ _4\"></span>cle Ther<span class=\"_ _4\"></span>apeutics (the \u201cBicyc<span class=\"_ _4\"></span>le Collaboration Agreement\u201d<span class=\"ff1 ws34\">)<span class=\"_ _1\"></span>. Under this agreement,<span class=\"_ _4\"></span> </span>Bicyc<span class=\"_ _4\"></span>le is responsible for identifying Bicy<span class=\"_ _4\"></span>cle-peptides r<span class=\"_ _4\"></span>elated to the collaboration target,<span class=\"_ _1\"></span> human plasma kallikrein,<span class=\"_ _1\"></span> for use<span class=\"_ _3\"></span> in various indications. Oxurion is r<span class=\"_ _4\"></span>esponsible for further de<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>velopment and product commercialization after the defined researc<span class=\"_ _4\"></span>h screening is performed by Bicyc<span class=\"_ _4\"></span>le<span class=\"_ _4\"></span>. The collabor<span class=\"_ _4\"></span>ation includes two stages<span class=\"_ _4\"></span>. During Stage 1<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> which has been completed<span class=\"_ _1\"></span>, Bicy<span class=\"_ _4\"></span>cle w<span class=\"_ _4\"></span>as obligated to perform specific researc<span class=\"_ _4\"></span>h activities in accordance with the researc<span class=\"_ _4\"></span>h plan focused on scr<span class=\"_ _4\"></span>eening the target using the Bicyc<span class=\"_ _4\"></span>le platform to identify compounds that meet the criteria set by the parties. During Stage 2,<span class=\"_ _1\"></span> which is ongoing,<span class=\"_ _4\"></span> Oxurion has continued researc<span class=\"_ _4\"></span>h activities on selected Bicyc<span class=\"_ _4\"></span>le-peptides with the goal of identifying compounds for further develop<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>ment and commercialization. THR-149 has been selected as a development compound under the Bicyc<span class=\"_ _4\"></span>le Collaboration Agreement. Bicyc<span class=\"_ _4\"></span>le granted certain worldwide intellectual property rights to Oxurion for the development,<span class=\"_ _4\"></span> manuf<span class=\"_ _4\"></span>acture and commer<span class=\"_ _1\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>cialization of licensed compounds associated with plasma kallikrein. The Bicy<span class=\"_ _4\"></span>cle Collaboration Agr<span class=\"_ _4\"></span>eement pro<span class=\"_ _4\"></span>vided an upfront payment of 1<span class=\"_ _4\"></span>.0 million euro and potential ad<span class=\"_ _4\"></span>ditional researc<span class=\"_ _4\"></span>h and development funding,<span class=\"_ _4\"></span> at an agreed upon FTE rate<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> should the researc<span class=\"_ _4\"></span>h effort require more than one FTE<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> or the researc<span class=\"_ _4\"></span>h plan be amended or extended by Oxurion<span class=\"_ _1a9\"> </span>Oxurion is also required to make certain milestone payments<span class=\"_ _1a9\"> </span> Based on IAS 38 \u201cIntangible assets<span class=\"_ _1\"></span>\u201d, Oxurion has not<span class=\"_ _1a9\"> </span> to Bicyc<span class=\"_ _4\"></span>le upon the achievement of specified r<span class=\"_ _4\"></span>esearch,<span class=\"_ _1\"></span> de<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>acquired a separate intang<span class=\"_ _4\"></span>ible asset that meets the defini<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>velopment,<span class=\"_ _4\"></span> regulatory and commercial milestones of up to<span class=\"_ _1a9\"> </span> tion of IAS 38<span class=\"_ _1\"></span>, and ther<span class=\"_ _4\"></span>efore these expenses ar<span class=\"_ _4\"></span>e recorded<span class=\"_ _1a9\"> </span> 21 million euro  (e<span class=\"_ _4\"></span>.g.,<span class=\"_ _4\"></span> 3 million euro r<span class=\"_ _4\"></span>elated to the first Phase<span class=\"_ _1a9\"> </span> under R&amp;D expenses. So f<span class=\"_ _4\"></span>ar<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the follo<span class=\"_ _4\"></span>wing upfront and<span class=\"_ _1a9\"> </span> 3 trial if the Company decides to do one<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> and 5 million euro<span class=\"_ _3\"></span> milestones payments to Bicyc<span class=\"_ _4\"></span>le were r<span class=\"_ _4\"></span>ecognized: 1<span class=\"_ _4\"></span>.0 million<span class=\"_ _1a9\"> </span> when the first regulatory approval in either the United States<span class=\"_ _1a9\"> </span> euro in 2013<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 0<span class=\"_ _1\"></span>.750 million euro in 2017<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> 1.0 million <span class=\"_ _4\"></span>euro in<span class=\"_ _1a9\"> </span> or the European Union is granted for the fir<span class=\"_ _4\"></span>st indication)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> 2018 and 2.0 million in 2020<span class=\"_ _1\"></span>. These w<span class=\"_ _4\"></span>ere all expensed as<span class=\"_ _1a9\"> </span> R&amp;D costs.<span class=\"_ _1a9\"> </span>Under the terms of the Bicyc<span class=\"_ _4\"></span>le Collaboration Agreement,<span class=\"_ _1\"></span> to date Oxurion has paid milestones of approximatel<span class=\"_ _4\"></span>y 5<span class=\"_ _1a9\"> </span> Galapagos<span class=\"_ _1a9\"> </span>million euro<span class=\"_ _4\"></span>. In ad<span class=\"_ _4\"></span>dition,<span class=\"_ _4\"></span> to the extent an<span class=\"_ _4\"></span>y of the collabora<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tion products cover<span class=\"_ _4\"></span>ed by the licenses gr<span class=\"_ _4\"></span>anted to Oxurion<span class=\"_ _1a9\"> </span> Oxurion has entered into the Galapagos License<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> which is a<span class=\"_ _1a9\"> </span> are commercialized<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Bicycle <span class=\"_ _4\"></span>would be entitled to receive<span class=\"_ _1a9\"> </span> global and exclusive in-licensing agreement with Galapag<span class=\"_ _4\"></span>os<span class=\"_ _1a9\"> </span> tiered ro<span class=\"_ _4\"></span>yalty payments of mid-single digits based on a<span class=\"_ _1a9\"> </span> to develop and commercialize integrin antagonists for the<span class=\"_ _1a9\"> </span> percentage of net sales<span class=\"_ _4\"></span>. Royalty payments are subject to<span class=\"_ _1a9\"> </span> treatment of diabetic ey<span class=\"_ _4\"></span>e disease. T<span class=\"_ _4\"></span>he company\u2019<span class=\"_ _1\"></span>s THR-687<span class=\"_ _4\"></span> certain reductions. Also<span class=\"_ _1\"></span>, if Oxurion gr<span class=\"_ _4\"></span>ants a sublicense to<span class=\"_ _1a9\"> </span> asset for which development has been paused is a r<span class=\"_ _4\"></span>esult of<span class=\"_ _1a9\"> </span> a third party for rights to the program for non-ophthalmic<span class=\"_ _1a9\"> </span> this agreement. Oxurion has obtained the exclusive rights f<span class=\"_ _4\"></span>or<span class=\"_ _1a9\"> </span> use,<span class=\"_ _1\"></span> Bicycle w<span class=\"_ _4\"></span>ould be entitled to receive tier<span class=\"_ _4\"></span>ed payments<span class=\"_ _1a9\"> </span> the clinical development,<span class=\"_ _1\"></span> manufacturing and commercial<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>of mid-single digits to low-doub<span class=\"_ _4\"></span>le digits (no higher than first<span class=\"_ _1a9\"> </span> ization under this agreement,<span class=\"_ _1\"></span> while Galapagos is entitled to<span class=\"_ _3\"></span> quartile) based on a percentage of non-royalty sublicensing<span class=\"_ _1a9\"> </span> receive a non-refundab<span class=\"_ _4\"></span>le upfront fee for tec<span class=\"_ _4\"></span>hnolog<span class=\"_ _3\"></span>y access,<span class=\"_ _4\"></span> income. In line with IFRS princip<span class=\"_ _4\"></span>les,<span class=\"_ _1\"></span> no provisions have been<span class=\"_ _1a9\"> </span> development milestone payments of up to 12.5 million<span class=\"_ _1a9\"> </span> made in the Company\u2019<span class=\"_ _1\"></span>s books for these payments<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>euro (e<span class=\"_ _4\"></span>.g.,<span class=\"_ _4\"></span> 1<span class=\"_ _1\"></span>.5 million euro related to the first Phase 3 if the<span class=\"_ _1a9\"> </span> Company decides to do one<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> and 5 million euro when the<span class=\"_ _3\"></span> In November 2017<span class=\"_ _0\"></span>,<span class=\"_ _4\"></span> the parties entered into an amendment<span class=\"_ _3\"></span> first regulatory approval in either the United States or the<span class=\"_ _1a9\"> </span> to the Bicyc<span class=\"_ _4\"></span>le collaboration agreement. T<span class=\"_ _4\"></span>his amendment<span class=\"_ _1a9\"> </span> European Union is granted for the fir<span class=\"_ _4\"></span>st indication)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> provides f<span class=\"_ _4\"></span>or additional researc<span class=\"_ _4\"></span>h ser<span class=\"_ _3\"></span>vices to be per<span class=\"_ _3\"></span>formed<span class=\"_ _1a9\"> </span> by Bicy<span class=\"_ _4\"></span>cle related to the identification of ad<span class=\"_ _4\"></span>ditional Bicyc<span class=\"_ _4\"></span>le<span class=\"_ _1a9\"> </span> In addition,<span class=\"_ _1\"></span> to the extent any of the collaboration products<span class=\"_ _1a9\"> </span> peptides binding to the target for Oxurion,<span class=\"_ _1\"></span> in its discretion,<span class=\"_ _4\"></span> to<span class=\"_ _1a9\"> </span> cover<span class=\"_ _4\"></span>ed by the licenses granted to Oxurion ar<span class=\"_ _4\"></span>e commercial<span class=\"_ _4\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>select as development compounds. Bicy<span class=\"_ _4\"></span>cle w<span class=\"_ _4\"></span>as obligated to<span class=\"_ _1a9\"> </span> ized<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> Galapagos would be entitled to receive certain sales-<span class=\"_ _1a9\"> </span>perform the work in accordance with an amended researc<span class=\"_ _4\"></span>h<span class=\"_ _1a9\"> </span> based milestone payments and tiered ro<span class=\"_ _4\"></span>yalty payments of<span class=\"_ _1a9\"> </span> plan under Stage 1 of the collabor<span class=\"_ _4\"></span>ation and was funded at a<span class=\"_ _1a9\"> </span> mid-single digits based on a percentage of net sales,<span class=\"_ _1\"></span> except<span class=\"_ _1a9\"> </span> specified FTE rate<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> plus any direct out of pocket expenses<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and<span class=\"_ _1a9\"> </span> in the case of annual sales exceeding 500 million euro<span class=\"_ _1\"></span>, in<span class=\"_ _1a9\"> </span> Oxurion was r<span class=\"_ _4\"></span>esponsible for Stage 2 resear<span class=\"_ _4\"></span>ch and an<span class=\"_ _4\"></span>y de<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>which case the ro<span class=\"_ _4\"></span>yalty is higher<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span> velopment after the selection of a development compound<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> Bicyc<span class=\"_ _4\"></span>le has completed Stage 1 of the researc<span class=\"_ _4\"></span>h plan. Ad<span class=\"_ _4\"></span>ditional<span class=\"_ _1a9\"> </span> In September 2017<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> the par<span class=\"_ _3\"></span>ties entered into an amendment<span class=\"_ _1a9\"> </span> milestones wer<span class=\"_ _4\"></span>e added for the potential additional licensed<span class=\"_ _1a9\"> </span> to the Galapagos License Agreement. Accor<span class=\"_ _4\"></span>ding to this<span class=\"_ _1a9\"> </span> compounds,<span class=\"_ _1\"></span> consistent with those of the initial Bicycle<span class=\"_ _1a9\"> </span> amendment,<span class=\"_ _4\"></span> Oxurion has taken o<span class=\"_ _4\"></span>ver the prosecution and<span class=\"_ _1a9\"> </span> Collaboration Agr<span class=\"_ _4\"></span>eement. This does not impact THR-149<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>maintenance of the licensed patents and consequently has<span class=\"_ _1a9\"> </span> acquired all rights in the licensed patents with effective date<span class=\"_ _1a9\"> </span> as of September 25<span class=\"_ _1\"></span>, 2017<span class=\"_ _25\"></span>. Oxurion will be entitled to deduct<span class=\"_ _1a9\"> </span> its documented and reasonable costs f<span class=\"_ _4\"></span>or prosecution and<span class=\"_ _1a9\"> </span>maintenance for the licensed patents from the ro<span class=\"_ _4\"></span>yalty due and payable to Galapagos under the Galapagos License Agreement. In line with IFRS principles<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> no pro<span class=\"_ _4\"></span>visions have been made in the Company\u2019<span class=\"_ _1\"></span>s books for these payments<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Oxurion has paid to Galapagos an upfront fee of 1<span class=\"_ _1\"></span>.0 million<span class=\"_ _3\"></span> euro in April 2016<span class=\"_ _25\"></span>, upon Galapagos supp<span class=\"_ _4\"></span>lying to Oxurion the licensed compounds,<span class=\"_ _1\"></span> including THR-687<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> and all data and manufacturing kno<span class=\"_ _4\"></span>w-how related to the licensed compounds,<span class=\"_ _1\"></span> which was capitalized as an intangible asset as it meets the conditions of a separately acquir<span class=\"_ _4\"></span>ed intan<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>gible asset under IAS 38<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> par<span class=\"_ _1\"></span>. 25<span class=\"_ _1\"></span>. Galapagos has no fur<span class=\"_ _3\"></span>ther performance obligations for development ser<span class=\"_ _3\"></span>vices. Since no commercialization was ac<span class=\"_ _4\"></span>hieved and no profit was generated<span class=\"_ _1\"></span>, no amortization was r<span class=\"_ _4\"></span>ecorded so far<span class=\"_ _1\"></span>. Until now<span class=\"_ _25\"></span>, no other advance payments have been made to Galapagos<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>In the first half of 2022,<span class=\"_ _4\"></span> the Galapagos license w<span class=\"_ _4\"></span>as fully impaired (1 million euro) given the announcement that Oxurion has decided not to advance THR-687<span class=\"_ _1\"></span> to par<span class=\"_ _3\"></span>t B of<span class=\"_ _3\"></span> the INTEGRAL trial.<span class=\"_ _1a9\"> </span>The future milestones m<span class=\"_ _4\"></span>ust be assessed to determine if they meet the capitalization criteria under IAS 38<span class=\"_ _1\"></span>, once they are paid<span class=\"_ _1\"></span>. We r<span class=\"_ _4\"></span>efer to the accounting policy section on intan<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>gible assets for mor<span class=\"_ _4\"></span>e details.<span class=\"_ _1a9\"> </span>Clinical T<span class=\"_ _25\"></span>rial Agreement<span class=\"_ _1a9\"> </span>Syneos Health<span class=\"_ _1a9\"> </span>Syneos Health (<span class=\"ff3 ws0\">\u201cSyneos<span class=\"_ _1\"></span>\u201d<span class=\"ff1 ws269\">) provides clinical r<span class=\"_ _4\"></span>esearch </span></span>ser<span class=\"_ _3\"></span>vices for the development of THR-149<span class=\"_ _1\"></span>. Ser<span class=\"_ _3\"></span>vices are billed on a project basis by w<span class=\"_ _4\"></span>ay of work or<span class=\"_ _4\"></span>ders (<span class=\"ff3 ws0\">\u201cW<span class=\"_ _4\"></span>ork </span>Orders<span class=\"_ _4\"></span>\u201d<span class=\"ff1 ws26a\">) enter<span class=\"_ _4\"></span>ed into based on a Master Ser<span class=\"_ _3\"></span>vices </span>Agreement (the <span class=\"ff3 ws0\">\u201cMSA<span class=\"_ _0\"></span>\u201d<span class=\"ff1 ws10b\">) for Clinical Research and Related </span></span>Ser<span class=\"_ _3\"></span>vices dated as of August 19<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2016<span class=\"_ _25\"></span>.   The MSA obligates the parties to use commercially rea<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>sonable efforts to progress the study in a timely manner and to meet any timelines for stud<span class=\"_ _4\"></span>y milestones and target dates applying prof<span class=\"_ _4\"></span>essional standards consistent with GCP and in adherence to applicab<span class=\"_ _4\"></span>le laws and regulations<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The major study milestones and target dates ar<span class=\"_ _4\"></span>e described in the binding W<span class=\"_ _4\"></span>ork Orders that ar<span class=\"_ _4\"></span>e entered into under the MSA. Subject to mutually agreed c<span class=\"_ _4\"></span>hange orders,<span class=\"_ _1\"></span> the W<span class=\"_ _4\"></span>ork Order constitutes a binding agreement,<span class=\"_ _1\"></span> and the par<span class=\"_ _3\"></span>ties are obligated to use commer<span class=\"_ _4\"></span>cially reasonable eff<span class=\"_ _4\"></span>orts to comply with the timelines and b<span class=\"_ _4\"></span>udgets set in the W<span class=\"_ _4\"></span>ork Orders,<span class=\"_ _1\"></span> unless a change order is agreed<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The W<span class=\"_ _4\"></span>ork Order f<span class=\"_ _4\"></span>or THR-149 specifies the basic parame<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ters of the THR -149 study<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> including,<span class=\"_ _1\"></span> without limitation, <span class=\"_ _4\"></span>the scope of work,<span class=\"_ _1\"></span> study-specific assumptions,<span class=\"_ _4\"></span> estimated time period for completing services,<span class=\"_ _4\"></span> estimated budget,<span class=\"_ _1\"></span> payment and currency sc<span class=\"_ _4\"></span>hedules,<span class=\"_ _1\"></span> resource allocation and/or<span class=\"_ _1\"></span>, as ap<span class=\"_ _4\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>plicable<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> other specific ser<span class=\"_ _23\"></span>vices to be performed by Syneos<span class=\"_ _4\"></span>. <span class=\"_ _190\"></span> The budget contained in the THR-149 W<span class=\"_ _1\"></span>ork Order can be changed b<span class=\"_ _4\"></span>y way of a change or<span class=\"_ _4\"></span>der if there are c<span class=\"_ _4\"></span>hanges in the scope of the work or the assumptions underl<span class=\"_ _4\"></span>ying the W<span class=\"_ _4\"></span>ork Order<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> pro<span class=\"_ _4\"></span>vided that the change or<span class=\"_ _4\"></span>der must be agreed betw<span class=\"_ _4\"></span>een the parties.<span class=\"_ _1a9\"> </span>Syneos also pro<span class=\"_ _4\"></span>vided ser<span class=\"_ _3\"></span>vices for the INTEGRAL study of THR-687<span class=\"_ _4\"></span> in treatment na\u00efve patients<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> whic<span class=\"_ _4\"></span>h has been terminated and is in the process of being wound do<span class=\"_ _4\"></span>wn pursuant to the terms of the W<span class=\"_ _4\"></span>ork Order f<span class=\"_ _4\"></span>or THR-687<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>Based on IAS 38 \u201cIntangible assets<span class=\"_ _1\"></span>\u201d, the costs paid to Syneos Health are not made in or<span class=\"_ _4\"></span>der to acquire an asset,<span class=\"_ _1\"></span> or to increase economic benefits alread<span class=\"_ _4\"></span>y embodied into an asset. Rather<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> they are an outsourced R&amp;D cost. T<span class=\"_ _4\"></span>herefor<span class=\"_ _4\"></span>e,<span class=\"_ _1\"></span> such costs are expensed to the statement of pr<span class=\"_ _4\"></span>ofit and loss as R&amp;D expenses,<span class=\"_ _1\"></span> as incurred<span class=\"_ _4\"></span>. In case of prepayments<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> an asset is recognized for suc<span class=\"_ _4\"></span>h prepayment,<span class=\"_ _1\"></span> and prepay<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ment is released to statement of profit and loss as costs are incurr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>. In 2022 and 2021<span class=\"_ _1\"></span>, 7<span class=\"_ _25\"></span>.4 million euro and 6<span class=\"_ _25\"></span>.5<span class=\"_ _1a9\"> </span>million euro wer<span class=\"_ _4\"></span>e paid respectively to S<span class=\"_ _4\"></span>yneos Health and<span class=\"_ _1a9\"> </span>recognized as R&amp;D expenses<span class=\"_ _4\"></span>. At y<span class=\"_ _4\"></span>ear<span class=\"_ _1\"></span>-end 2022,<span class=\"_ _4\"></span> a prepay<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ment in the amount of .2.3 million euro is recorded on the<span class=\"_ _1a9\"> </span>statement of profit and loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfResearchAndDevelopmentExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-74": {
   "value": "5.6.4  General and administrative expenses IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Employee benefits -1,753 -2,653 Consultancy fees -3,141 -3,470 Insurance -361 -343 Other -692 -622 Depreciation and amortization -33 -62 Total general and administrative expenses -5,980 -7,150 The most important piece of the general and administra- tive expenses are ICT contractors, management, audit fees, Board of Directors\u2019 fees, investor relations contractors, legal and funding fees and HR services",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGeneralAndAdministrativeExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-90": {
   "value": "IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Other operating income 830 1,245 Total other operating income 830 1,245 In 2022, Oxurion received other operating income of 0.8 million euro compared to 1.2 million euro in 2021. The accrued tax credit amounts to 0.6 million euro in 2022 compared to 0.9 million euro in 2021 . ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherOperatingIncomeExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-103": {
   "value": "IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Other operating income 830 1,245 Total other operating income 830 1,245 In 2022, Oxurion received other operating income of 0.8 million euro compared to 1.2 million euro in 2021. The accrued tax credit amounts to 0.6 million euro in 2022 compared to 0.9 million euro in 2021 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherOperatingIncomeExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-116": {
   "value": "5.6.7  Finance income IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Interest 9 9 Fair value adjustment convertible bonds 436 0 Exchange rate gain (on USD and GBP) 194 162 Total finance income 639 171 As a result of USD revaluations, the unrealized exchange gain in 2022 amounted to 0.177 million euro (2021: 0.146 million euro) whereas 0.017 million euro exchange gains were realized (2021: 0.016 million euro). The fair value adjustment convertible bonds relate for 0.436 million euro to the Kreos/Pontifax convertible bond (2021: 0.025 million euro finance expense). We refer to note 5.7.11 for more information. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInterestIncomeExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-45": {
   "value": "5.6.7  Finance income IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Interest 9 9 Fair value adjustment convertible bonds 436 0 Exchange rate gain (on USD and GBP) 194 162 Total finance income 639 171 As a result of USD revaluations, the unrealized exchange gain in 2022 amounted to 0.177 million euro (2021: 0.146 million euro) whereas 0.017 million euro exchange gains were realized (2021: 0.016 million euro). The fair value adjustment convertible bonds relate for 0.436 million euro to the Kreos/Pontifax convertible bond (2021: 0.025 million euro finance expense). We refer to note 5.7.11 for more informatio",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinanceIncomeExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-91": {
   "value": "5.6.7  Finance income IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Interest 9 9 Fair value adjustment convertible bonds 436 0 Exchange rate gain (on USD and GBP) 194 162 Total finance income 639 171 As a result of USD revaluations, the unrealized exchange gain in 2022 amounted to 0.177 million euro (2021: 0.146 million euro) whereas 0.017 million euro exchange gains were realized (2021: 0.016 million euro). The fair value adjustment convertible bonds relate for 0.436 million euro to the Kreos/Pontifax convertible bond (2021: 0.025 million euro finance expense). We refer to note 5.7.11 for more information. 5.6.8  Finance expense IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Bank costs -21 -26 Impairment on short-term financial investments -15 -5 Fair value adjustment convertible bonds -7,824 -372 Other -1,349 -713 Exchange rate loss (on USD and GBP) -170 -152 Total finance expense -9,379 -1,268 The fair value adjustment convertible bonds relate for 7.824 million euro to the Negma convertible bond (2021: 0.347 million euro). We refer to note 5.7.11 for more information The other financial expenses relate for 0.700 million euro to the Negma convertible bond (2021: 0.525 million euro), 0.636 million euro to the Kreos/Pontifax convertible bond (2021: 0.177 million euro) and 0.013 million euro to other (2021: 0.011 million euro). As a result of USD revaluations, the unrealized exchange losses in 2022 amounted to 0.004 million euro (2021: 0.138 million euro) whereas 0.166 million euro exchange losses were realized (2021: 0.014 million euro ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinanceIncomeExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-104": {
   "value": "5.6.7  Finance income IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Interest 9 9 Fair value adjustment convertible bonds 436 0 Exchange rate gain (on USD and GBP) 194 162 Total finance income 639 171 As a result of USD revaluations, the unrealized exchange gain in 2022 amounted to 0.177 million euro (2021: 0.146 million euro) whereas 0.017 million euro exchange gains were realized (2021: 0.016 million euro). The fair value adjustment convertible bonds relate for 0.436 million euro to the Kreos/Pontifax convertible bond (2021: 0.025 million euro finance expense). We refer to note 5.7.11 for more information. 5.6.8  Finance expense IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Bank costs -21 -26 Impairment on short-term financial investments -15 -5 Fair value adjustment convertible bonds -7,824 -372 Other -1,349 -713 Exchange rate loss (on USD and GBP) -170 -152 Total finance expense -9,379 -1,268 The fair value adjustment convertible bonds relate for 7.824 million euro to the Negma convertible bond (2021: 0.347 million euro). We refer to note 5.7.11 for more information The other financial expenses relate for 0.700 million euro to the Negma convertible bond (2021: 0.525 million euro), 0.636 million euro to the Kreos/Pontifax convertible bond (2021: 0.177 million euro) and 0.013 million euro to other (2021: 0.011 million euro). As a result of USD revaluations, the unrealized exchange losses in 2022 amounted to 0.004 million euro (2021: 0.138 million euro) whereas 0.166 million euro exchange losses were realized (2021: 0.014 million euro ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInterestIncomeExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-75": {
   "value": "5.6.8  Finance expense IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Bank costs -21 -26 Impairment on short-term financial investments -15 -5 Fair value adjustment convertible bonds -7,824 -372 Other -1,349 -713 Exchange rate loss (on USD and GBP) -170 -152 Total finance expense -9,379 -1,268 The fair value adjustment convertible bonds relate for 7.824 million euro to the Negma convertible bond (2021: 0.347 million euro). We refer to note 5.7.11 for more information . The other financial expenses relate for 0.700 million euro to the Negma convertible bond (2021: 0.525 million euro), 0.636 million euro to the Kreos/Pontifax convertible bond (2021: 0.177 million euro) and 0.013 million euro to other (2021: 0.011 million euro). As a result of USD revaluations, the unrealized exchange losses in 2022 amounted to 0.004 million euro (2021: 0.138 million euro) whereas 0.166 million euro exchange losses were realized (2021: 0.014 million euro ) . ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinanceCostExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-117": {
   "value": "5.6.8  Finance expense IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Bank costs -21 -26 Impairment on short-term financial investments -15 -5 Fair value adjustment convertible bonds -7,824 -372 Other -1,349 -713 Exchange rate loss (on USD and GBP) -170 -152 Total finance expense -9,379 -1,268 The fair value adjustment convertible bonds relate for 7.824 million euro to the Negma convertible bond (2021: 0.347 million euro). We refer to note 5.7.11 for more information The other financial expenses relate for 0.700 million euro to the Negma convertible bond (2021: 0.525 million euro), 0.636 million euro to the Kreos/Pontifax convertible bond (2021: 0.177 million euro) and 0.013 million euro to other (2021: 0.011 million euro). As a result of USD revaluations, the unrealized exchange losses in 2022 amounted to 0.004 million euro (2021: 0.138 million euro) whereas 0.166 million euro exchange losses were realized (2021: 0.014 million euro ) ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInterestExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-76": {
   "value": "<div class=\"t m1 hd ff3 fs8 fc4 sc0 ls33 ws1c4 gs15f\">5.6.<span class=\"_ _3\"></span>9<span class=\"_ _3\"></span> <span class=\"_ _7f\"> </span><span class=\"ls21 ws27\">E<span class=\"_ _4\"></span>mploy<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></span></div><div class=\"gs145\"><table class=\"s w25d h59\" id=\"_6d6b2b26-2099-4022-b6ef-1e0c711364f6\"><tr><td class=\"c n xf0 y608 w114 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2f4 y608 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x2df y608 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y609 w25e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Wages<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> salaries and bonuses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x339 y609 w25f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-4,456<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33a y609 w260 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-8<span class=\"_ _4\"></span>,030<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y60a w261 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Share-based compensation expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33b y60a w262 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-933<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33c y60a w263 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-1<span class=\"_ _4\"></span>,107<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y60b w264 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Pension costs<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33d y60b w11b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-203<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33e y60b w213 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-391<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y60c w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x33f y60c w111 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,592<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x340 y60c w265 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-9<span class=\"_ _4\"></span>,528<span class=\"_ _1a9\"> </span></div></td></tr></table></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws18e gs160\">The pension costs included in the tab<span class=\"_ _4\"></span>le above consist f<span class=\"_ _4\"></span>or </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws15 gs161\">0<span class=\"_ _1\"></span>.149 million euro (2021: 0<span class=\"_ _1\"></span>.37<span class=\"_ _25\"></span>4 million euro) of costs related </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wsfd gs162\">to defined benefit plans and for 0<span class=\"_ _25\"></span>.054 million euro (2021:<span class=\"_ _3\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 wse1 gs163\">0<span class=\"_ _1\"></span>.017<span class=\"_ _4\"></span> million euro) of costs r<span class=\"_ _4\"></span>elated to defined contribution </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws154 gs164\">plans<span class=\"_ _4\"></span>. W<span class=\"_ _4\"></span>e ref<span class=\"_ _4\"></span>er to note 5<span class=\"_ _1\"></span>.7<span class=\"_ _1\"></span>.9 for more information on the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws0 gs165\">defined benefit plans<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws255 gs166\">The aver<span class=\"_ _4\"></span>age number of full<span class=\"_ _4\"></span>-time equivalents (including </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws0 gs167\">executive directors) w<span class=\"_ _4\"></span>as as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span></div><div class=\"gs168\"><table class=\"s w248 h58\" id=\"_9a2c8cf0-85c2-4780-ae1e-11189846e6c9\"><tr><td class=\"c n xf0 y607 w249 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN NUMBERS<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x325 y607 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x326 y607 w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w24a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Research and development<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x327 y56a w208 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">27<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x328 y56a w24b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">45<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w24c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">General and administration<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x329 y56b w1bb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32a y56b w24d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">10<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w24e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Selling<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32b y5ba w24f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32c y5ba w250 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32d y515 w252 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">35<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32e y515 w253 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">56<span class=\"_ _1a9\"> </span></div></td></tr></table></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws197 gs169\">The share-based compensation expense inc<span class=\"_ _4\"></span>luded in the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls15 ws0 gs16a\">statement of profit and loss is given belo<span class=\"_ _4\"></span>w:<span class=\"_ _1a9\"> </span></div><div class=\"gs16b\"><table class=\"s w254 h58\" id=\"_d35bd503-5f9f-4345-95ba-b173b45e2916\"><tr><td class=\"c n x129 y607 w6d h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">N '000 EURO (FOR THE YEAR ENDED 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x32f y607 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x330 y607 w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w255 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Research and development expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x331 y56a w256 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">427<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x332 y56a w257 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">289<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w258 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">General and administrative expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x333 y56b w1d7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">495<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x334 y56b w259 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">798<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w7f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Selling expenses<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x335 y5ba w25a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">11<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x336 y5ba wcc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">20<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x337 y515 w25b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">933<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x338 y515 w25c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,107<span class=\"_ _1a9\"> </span></div></td></tr></table></div>W<span class=\"_ _4\"></span>e refer to note 5<span class=\"_ _1\"></span>.7<span class=\"_ _25\"></span>.8<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> for fur<span class=\"_ _3\"></span>ther information regarding the share-based payment plans<div class=\"t m0 h17 ff8 fs9 fc7 sc0 ls0 ws0 gs1c6\">Share-based payment plans<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsaa gs1c7\">The Group has cr<span class=\"_ _4\"></span>eated various subscription rights plans </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs1c8\">that can be granted to personnel and a subscription rights </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs1c9\">plan for Non-Executive Dir<span class=\"_ _4\"></span>ectors. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1a gs16f\">Since the public listing,<span class=\"_ _4\"></span> all subscription rights p<span class=\"_ _4\"></span>lans have </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs170\">been created in respect of Oxurion.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf4 gs1ca\">At December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022,<span class=\"_ _4\"></span> there are five outstanding sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs15a\">scription rights plans,<span class=\"_ _1\"></span> as follows:<span class=\"_ _1a9\"> </span></div><div class=\"gs1cb\"><table class=\"s w3a7 h69\" id=\"_4830f676-916e-42d2-9529-3aeaef3de84b\"><tr><td class=\"t m1 x34d h12 y6e5 ff3 fsb fc7 sc0 ls1b ws0\">CREA<span class=\"_ _1\"></span>TION DA<span class=\"_ _1\"></span>TE OF PLAN<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x521 h12 y6e6 ff3 fsb fc7 sc0 ls1b ws0\">DA<span class=\"_ _1\"></span>TE GRAN<span class=\"ls0\">-<span class=\"_ _1a9\"> </span></span></td><td class=\"t m1 x522 h12 y6e6 ff3 fsb fc7 sc0 ls1b ws0\">EXERCISE PRICE </td><td class=\"t m1 x523 h12 y6e5 ff3 fsb fc7 sc0 ls1b wsbe\">BENEFICIARY<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td class=\"t m1 x524 h12 y6e7 ff3 fsb fc7 sc0 ls1b wsbe\">TED<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x525 h12 y6e7 ff3 fsb fc7 sc0 ls1b ws0\">(IN EURO)<span class=\"_ _1a9\"> </span></td><td></td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x526 h13 y6e8 ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees,<span class=\"_ _4\"></span> key </td></tr><tr><td class=\"c n xf0 y6e9 w3a8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws259\">Subscription Rights Plan 2017<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x527 y6e9 w3a9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2017-2020</div></td><td class=\"t m2 x522 h13 y6ea ff1 fsc fc7 sc0 ls0 ws0\">Between 2.64 </td><td class=\"t m2 x528 h13 y6ea ff1 fsc fc7 sc0 ls0 ws0\">consultants and </td></tr><tr><td></td><td></td><td class=\"t m2 x529 h13 y6eb ff1 fsc fc7 sc0 ls0 ws0\">and 6<span class=\"_ _4\"></span>.55<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x526 h13 y6eb ff1 fsc fc7 sc0 ls0 ws0\">directors of the </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x3ea h13 y6ec ff1 fsc fc7 sc0 ls0 ws0\">Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6ed ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td></td><td class=\"t m2 x52a h13 y6ee ff1 fsc fc7 sc0 ls0 ws0\">Non-Executive </td></tr><tr><td class=\"t m2 x34d h13 y6ef ff1 fsc fc7 sc0 ls0 ws0\">2020<span class=\"_ _1a9\"> </span></td><td class=\"c n x52b y6f0 w3aa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x52c y6f0 w3ab h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.57</div></td><td class=\"t m2 x526 h13 y6f1 ff1 fsc fc7 sc0 ls0 ws0\">Directors of the </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x3ea h13 y6f2 ff1 fsc fc7 sc0 ls0 ws0\">Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6f3 ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td class=\"t m2 x3ed h13 y6f3 ff1 fsc fc7 sc0 ls0 ws0\">Between 1<span class=\"_ _4\"></span>.75 </td><td class=\"t m2 x526 h13 y6f4 ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees and </td></tr><tr><td class=\"t m2 x34d h13 y6f5 ff1 fsc fc7 sc0 ls0 ws0\">2021-1<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x52d h13 y6f6 ff1 fsc fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x529 h13 y6f5 ff1 fsc fc7 sc0 ls0 ws0\">and 2.60<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x528 h13 y6f6 ff1 fsc fc7 sc0 ls0 ws0\">key consultants </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x52e h13 y6f7 ff1 fsc fc7 sc0 ls0 ws0\">of the Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6f8 ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td></td><td class=\"t m2 x526 h13 y6f9 ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees and </td></tr><tr><td class=\"t m2 x34d h13 y6fa ff1 fsc fc7 sc0 ls0 ws0\">2021-2<span class=\"_ _1a9\"> </span></td><td class=\"c n x52b y6fb w3aa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x52f y6fb w3ac h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>.75</div></td><td class=\"t m2 x528 h13 y6fc ff1 fsc fc7 sc0 ls0 ws0\">key consultants </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x52e h13 y6fd ff1 fsc fc7 sc0 ls0 ws0\">of the Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6fe ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td class=\"t m2 x3e8 h13 y6fe ff1 fsc fc7 sc0 ls0 ws0\">Between 0<span class=\"_ _1\"></span>.444 </td><td class=\"t m2 x526 h13 y6ff ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees and </td></tr><tr><td class=\"t m2 x34d h13 y700 ff1 fsc fc7 sc0 ls0 ws0\">2021-3<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x530 h13 y701 ff1 fsc fc7 sc0 ls0 ws0\">2021-2022<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x525 h13 y700 ff1 fsc fc7 sc0 ls0 ws0\">and 1<span class=\"_ _4\"></span>.82<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x528 h13 y701 ff1 fsc fc7 sc0 ls0 ws0\">key consultants </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x52e h13 y702 ff1 fsc fc7 sc0 ls0 ws0\">of the Group<span class=\"_ _1a9\"> </span></td></tr></table></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws178 gs1cc\">Brief overview of all outstanding subscription rights granted </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs1cd\">between 2017<span class=\"_ _1\"></span> and December 31<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span></div>Subscription Rights Plan 2017<span class=\"_ _1a9\"> </span>On November 20<span class=\"_ _25\"></span>, 2017<span class=\"_ _0\"></span>,<span class=\"_ _4\"></span> the EGM of Oxurion decided to<span class=\"_ _1a9\"> </span>issue the Subscription Rights Plan 2017<span class=\"_ _4\"></span> (formerl<span class=\"_ _4\"></span>y referr<span class=\"_ _4\"></span>ed<span class=\"_ _1a9\"> </span>to as the warr<span class=\"_ _4\"></span>ants plan 2017)<span class=\"_ _1\"></span>. Under this Subscription<span class=\"_ _1a9\"> </span>Rights Plan 2017<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> which has a term of ten years and all<span class=\"_ _1a9\"> </span>will lapse in 2027<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> a maximum of 1,440<span class=\"_ _25\"></span>,000 subscription<span class=\"_ _1a9\"> </span>rights can be issued and granted to emplo<span class=\"_ _4\"></span>yees<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> dir<span class=\"_ _4\"></span>ectors,<span class=\"_ _1\"></span> and consultants of the Group<span class=\"_ _4\"></span>. Eac<span class=\"_ _4\"></span>h subscription right<span class=\"_ _1a9\"> </span>entitles the holder to subscribe to one Oxurion share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Subscription rights are granted under this p<span class=\"_ _4\"></span>lan by the<span class=\"_ _1a9\"> </span>Board of Directors or the Nomination and Rem<span class=\"_ _4\"></span>uneration<span class=\"_ _1a9\"> </span>Committee,<span class=\"_ _1\"></span> except for directors<span class=\"_ _4\"></span>. Authority to grant sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>scription rights to directors is held b<span class=\"_ _4\"></span>y the general meeting<span class=\"_ _1a9\"> </span>of shareholders<span class=\"_ _4\"></span>. Subscription rights are off<span class=\"_ _4\"></span>ered free of<span class=\"_ _1a9\"> </span>charge<span class=\"_ _4\"></span>. The exercise price is equal to the lo<span class=\"_ _4\"></span>w<span class=\"_ _4\"></span>er of (i) the<span class=\"_ _1a9\"> </span>average of the c<span class=\"_ _4\"></span>losing prices of the share on the stoc<span class=\"_ _4\"></span>k<span class=\"_ _1a9\"> </span>market during the 30 days prior to the offering of a sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>scription right or (ii) the closing price on the last stock<span class=\"_ _1a9\"> </span>market day prior to the offer<span class=\"_ _1\"></span>. Subscription rights granted<span class=\"_ _1a9\"> </span>under this plan have a thr<span class=\"_ _4\"></span>ee year gr<span class=\"_ _4\"></span>aded vesting (50%<span class=\"_ _1a9\"> </span>after 2 years and 50% after 3 y<span class=\"_ _4\"></span>ears) with no performance<span class=\"_ _1a9\"> </span>conditions. T<span class=\"_ _4\"></span>he conditions under which a subscription right<span class=\"_ _1a9\"> </span>holder is entitled to exercise a subscription right are estab<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lished by the Nomination and Remuner<span class=\"_ _4\"></span>ation Committee.<span class=\"_ _1a9\"> </span>Subscription Rights Plan 2020<span class=\"_ _1a9\"> </span>On December 23<span class=\"_ _1\"></span>, 2020<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> the Board of Directors pr<span class=\"_ _4\"></span>oposed<span class=\"_ _1a9\"> </span>to issue the Oxurion 2020 Subscription Rights Plan,<span class=\"_ _4\"></span> which<span class=\"_ _1a9\"> </span>was decided b<span class=\"_ _4\"></span>y the A<span class=\"_ _4\"></span>GM held in May 2019<span class=\"_ _1\"></span>. Under this<span class=\"_ _1a9\"> </span>Subscription Rights Plan 2020<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> which has a term of ten<span class=\"_ _1a9\"> </span>years and all subscription rights will lapse in 2030<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> a<span class=\"_ _1a9\"> </span>maximum of 150<span class=\"_ _1\"></span>,000 subscription rights can be issued<span class=\"_ _1a9\"> </span>and granted to Non-Executive Director<span class=\"_ _4\"></span>s of Oxurion. Each<span class=\"_ _1a9\"> </span>subscription right entitles the holder to subscribe to one<span class=\"_ _1a9\"> </span>Oxurion share subject to the payment of the exercise price<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The exercise price is equal to the lo<span class=\"_ _4\"></span>wer of (i) the a<span class=\"_ _4\"></span>verage<span class=\"_ _1a9\"> </span>of the closing prices of a share on the stoc<span class=\"_ _4\"></span>k market during<span class=\"_ _1a9\"> </span>the 30 days prior to the offering of a subscription right or<span class=\"_ _1a9\"> </span>(ii) the closing price on the last stock market day prior to<span class=\"_ _1a9\"> </span>the offer<span class=\"_ _1\"></span>. Subscription rights granted under this plan ha<span class=\"_ _4\"></span>ve a<span class=\"_ _1a9\"> </span>contractual term of ten y<span class=\"_ _4\"></span>ears and vest immediately<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>Subscription Rights Plans 2021<span class=\"_ _1a9\"> </span>On April 14<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2021,<span class=\"_ _1\"></span> the Board of Directors of Oxurion<span class=\"_ _1a9\"> </span>decided to issue the Subscription Rights Plan 2021-1<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Under this Subscription Rights Plan 2021-1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> which has a<span class=\"_ _1a9\"> </span>term of ten years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and all subscription rights will lapse in<span class=\"_ _1a9\"> </span>2031<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> a maximum of 1<span class=\"_ _1\"></span>.085 million subscription rights can<span class=\"_ _1a9\"> </span>be issued and granted to emplo<span class=\"_ _4\"></span>yees i and consultants of<span class=\"_ _1a9\"> </span>the Group<span class=\"_ _4\"></span>. Eac<span class=\"_ _4\"></span>h subscription right entitles the holder to<span class=\"_ _1a9\"> </span>subscribe to one Oxurion share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On September 22,<span class=\"_ _4\"></span> 2021<span class=\"_ _1\"></span>, the Boar<span class=\"_ _4\"></span>d of Directors of Oxurion<span class=\"_ _1a9\"> </span>has decided to issue the Subscription Rights Plan 2021-2.<span class=\"_ _1a9\"> </span>Under this Subscription Rights Plan 2021-2,<span class=\"_ _4\"></span> which has<span class=\"_ _1a9\"> </span>a term of ten years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and all subscription rights will lapse<span class=\"_ _1a9\"> </span>in 2031<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> a maximum of 550<span class=\"_ _1\"></span>,000 subscription rights can<span class=\"_ _1a9\"> </span>be issued and granted to emplo<span class=\"_ _4\"></span>yees and consultants of<span class=\"_ _1a9\"> </span>the Group<span class=\"_ _4\"></span>. Eac<span class=\"_ _4\"></span>h subscription right entitles the holder to<span class=\"_ _1a9\"> </span>subscribe to one Oxurion share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On December 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _1\"></span>, the Boar<span class=\"_ _4\"></span>d of Directors of Oxurion<span class=\"_ _1a9\"> </span>has decided to issue the Subscription Rights Plan 2021-3<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Under this Subscription Rights Plan 2021-3<span class=\"_ _1\"></span>, whic<span class=\"_ _4\"></span>h has a<span class=\"_ _1a9\"> </span>term of ten years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and all will lapse in 203<span class=\"_ _4\"></span>1<span class=\"_ _1\"></span>, a maximum of<span class=\"_ _1a9\"> </span>862,000 subscription rights can be issued and granted to<span class=\"_ _1a9\"> </span>emplo<span class=\"_ _4\"></span>yees and consultants of the Group<span class=\"_ _1\"></span>. Each subscrip<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion right entitles the holder to subscribe to one Oxurion<span class=\"_ _1a9\"> </span>share<span class=\"_ _4\"></span>.  These plans ar<span class=\"_ _4\"></span>e collectively r<span class=\"_ _4\"></span>eferred to as the<span class=\"_ _1a9\"> </span>Subscription Rights Plans 2021<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Subscription rights are granted under the Subscription<span class=\"_ _1a9\"> </span>Rights Plans 2021 by the Board of Dir<span class=\"_ _4\"></span>ectors or the<span class=\"_ _1a9\"> </span>Nomination and Remuneration Committee<span class=\"_ _4\"></span>. Subscription<span class=\"_ _1a9\"> </span>rights are offer<span class=\"_ _4\"></span>ed free of charge<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he exercise price is<span class=\"_ _1a9\"> </span>equal to the low<span class=\"_ _4\"></span>er of (i) the volume weighted a<span class=\"_ _4\"></span>verage price<span class=\"_ _1a9\"> </span>(VW<span class=\"_ _1\"></span>AP) of the Company\u2019<span class=\"_ _25\"></span>s shares on the stock exchange over a period of thirty calendar days prior to the date of the offer or (ii) the closing price of the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s shares on the last business day prior to the date of the offer<span class=\"_ _1\"></span>. In general,<span class=\"_ _4\"></span> half of the subscription rights under these p<span class=\"_ _4\"></span>lans vest after one year and the other half vest quarterly over the follo<span class=\"_ _4\"></span>wing two y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or the subscription rights granted in April 2021 under the Subscription Rights Plan 2021-1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the vesting period exceptionally commenced on December 28<span class=\"_ _1\"></span>, 2020<span class=\"_ _25\"></span>. The conditions under which a subscription rights holder is entitled to exercise a subscription right are estab<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lished by the Nomination and Remuner<span class=\"_ _4\"></span>ation Committee. The grant date f<span class=\"_ _4\"></span>air values of the subscription rights granted under the different Subscription Plans ha<span class=\"_ _4\"></span>ve been deter<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mined by using the Blac<span class=\"_ _4\"></span>k &amp; Scholes model,<span class=\"_ _4\"></span> taking into account the follo<span class=\"_ _4\"></span>wing assumptions:<span class=\"_ _1a9\"> </span>2017 SUBSCRIPTION PLAN<span class=\"_ _175\"> </span><span class=\"wsbe\">ASSUMPTIONS<span class=\"_ _1a9\"> </span></span>GRANT DA<span class=\"_ _1\"></span>TE<span class=\"_ _176\"> </span>DEC 17<span class=\"_ _6\"> </span>DEC 17<span class=\"_ _6\"> </span>JUN 18<span class=\"_ _1f\"> </span>DEC 18<span class=\"_ _1f\"> </span>DEC 18<span class=\"_ _2\"> </span>JUL 19<span class=\"_ _1f\"> </span>DEC 19<span class=\"_ _1f\"> </span>DEC 19<span class=\"_ _b\"> </span>JUN 20<span class=\"_ _177\"> </span>AUG 20<span class=\"_ _1a9\"> </span>Number of warrants gr<span class=\"_ _4\"></span>anted<span class=\"_ _12\"> </span>251<span class=\"_ _4\"></span>,000<span class=\"_ _67\"> </span>150<span class=\"_ _4\"></span>,000<span class=\"_ _12\"> </span>33<span class=\"_ _4\"></span>,500<span class=\"_ _5a\"> </span>208,000<span class=\"_ _67\"> </span>150<span class=\"_ _4\"></span>,000<span class=\"_ _12\"> </span>44,300<span class=\"_ _65\"> </span>136<span class=\"_ _4\"></span>,000<span class=\"_ _65\"> </span>125,000<span class=\"_ _12\"> </span>43<span class=\"_ _4\"></span>,500<span class=\"_ _b1\"> </span>10<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span>Current share price on grant date (in euro)<span class=\"_ _1a9\"> </span>3<span class=\"_ _4\"></span>.38<span class=\"_ _35\"> </span>3<span class=\"_ _1\"></span>.38<span class=\"_ _56\"> </span>7<span class=\"_ _1\"></span>.07<span class=\"_ _35\"> </span>3<span class=\"_ _4\"></span>.52<span class=\"_ _45\"> </span>3.52<span class=\"_ _32\"> </span>4.65<span class=\"_ _5d\"> </span>2.875<span class=\"_ _b\"> </span>2.875<span class=\"_ _35\"> </span>3.07<span class=\"_ _45\"> </span>2.72<span class=\"_ _1a9\"> </span>Exercise price<span class=\"_ _2c\"> </span>3<span class=\"_ _4\"></span>.38<span class=\"_ _5d\"> </span>4<span class=\"_ _4\"></span>.593<span class=\"_ _5d\"> </span>6<span class=\"_ _1\"></span>.549<span class=\"_ _e2\"> </span><span class=\"ls3e ws222\">3.4<span class=\"_ _b\"> </span></span>4.593<span class=\"_ _5d\"> </span>3.822<span class=\"_ _32\"> </span>2.64<span class=\"_ _5d\"> </span>4.593<span class=\"_ _b\"> </span>2.847<span class=\"_ _73\"> </span>2.8<span class=\"_ _1a9\"> </span>Expected dividend yield<span class=\"_ _116\"> </span>-<span class=\"_ _105\"> </span>-<span class=\"_ _103\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _103\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _1a9\"> </span>Expected stock price volatility<span class=\"_ _48\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _7d\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _2\"> </span>60%<span class=\"_ _7d\"> </span>60%<span class=\"_ _7d\"> </span>60%<span class=\"_ _2\"> </span>60%<span class=\"_ _1a9\"> </span>Risk<span class=\"_ _4\"></span>-free interest r<span class=\"_ _4\"></span>ate<span class=\"_ _28\"> </span>0<span class=\"_ _4\"></span>.59%<span class=\"_ _1b\"> </span>0<span class=\"_ _4\"></span>.59%<span class=\"_ _177\"> </span>0<span class=\"_ _4\"></span>.73%<span class=\"_ _1b\"> </span>0<span class=\"_ _4\"></span>.69%<span class=\"_ _f\"> </span>0.69%<span class=\"_ _b1\"> </span>-0.25%<span class=\"_ _f\"> </span>-0<span class=\"_ _1\"></span>.12%<span class=\"_ _1b\"> </span>-0<span class=\"_ _4\"></span>.12%<span class=\"_ _7e\"> </span>-0<span class=\"_ _4\"></span>.23%<span class=\"_ _7e\"> </span>-0<span class=\"_ _1\"></span>.38%<span class=\"_ _1a9\"> </span>Expected duration<span class=\"_ _55\"> </span>10<span class=\"_ _13\"> </span>10<span class=\"_ _3a\"> </span><span class=\"ls52 ws25b\">9.<span class=\"_ _23\"></span>5<span class=\"_ _2b\"> </span></span>9<span class=\"_ _101\"> </span>9<span class=\"_ _79\"> </span><span class=\"ls3e ws222\">8.<span class=\"_ _3\"></span>5<span class=\"_ _53\"> </span></span>8<span class=\"_ _82\"> </span>8<span class=\"_ _38\"> </span><span class=\"ls53 ws25c\">7.<span class=\"_ _23\"></span>5<span class=\"_ _36\"> </span>7.<span class=\"_ _23\"></span>5<span class=\"_ _1a9\"> </span></span>F<span class=\"_ _4\"></span>air value<span class=\"_ _118\"> </span>1<span class=\"_ _4\"></span>.56<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.29<span class=\"_ _35\"> </span>3<span class=\"_ _4\"></span>.33<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.58<span class=\"_ _36\"> </span><span class=\"ls4d ws252\">1.3<span class=\"_ _35\"> </span></span>2.23<span class=\"_ _74\"> </span>1.75<span class=\"_ _56\"> </span>1.43<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.83<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.56<span class=\"_ _1a9\"> </span>2020 SUBSCRIPTION PLAN<span class=\"_ _b6\"> </span><span class=\"wsbe\">ASSUMPTIONS<span class=\"_ _1a9\"> </span></span>GRANT DA<span class=\"_ _1\"></span>TE<span class=\"_ _1c\"> </span>MAR 21<span class=\"_ _1a9\"> </span>Number of warrants gr<span class=\"_ _4\"></span>anted<span class=\"_ _9e\"> </span>75<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span>Current share price on grant date (in euro)<span class=\"_ _1a9\"> </span>2.55<span class=\"_ _1a9\"> </span>Exercise price<span class=\"_ _17a\"> </span>2.57<span class=\"_ _1a9\"> </span>Expected dividend yield<span class=\"_ _17b\"> </span>-<span class=\"_ _1a9\"> </span>Expected stock price volatility<span class=\"_ _9\"> </span>45%<span class=\"_ _1a9\"> </span>Risk<span class=\"_ _4\"></span>-free interest r<span class=\"_ _4\"></span>ate<span class=\"_ _10b\"> </span>-0.16%<span class=\"_ _1a9\"> </span>Expected duration<span class=\"_ _113\"> </span>9<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>air value<span class=\"_ _97\"> </span>1<span class=\"_ _4\"></span>.23<span class=\"_ _1a9\"> </span>The assumptions used in determining the fair value of the subscription rights gr<span class=\"_ _4\"></span>anted are based on the follo<span class=\"_ _4\"></span>wing data: \u2022 <span class=\"_ _62\"> </span><span class=\"ws6e\">Current share price on grant date \u2013 the c<span class=\"_ _4\"></span>losing price </span>on the stock market of Euronext Brussels<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws58\">Expected stock price volatility \u2013 the historical volatility </span>of Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s share price.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws25d\">Expected duration \u2013 calculated as the estimated </span><table class=\"s w3c4 h6b\" id=\"_520e5b8c-0cd4-4774-8e2e-f3f3b3713294\"><tr><td class=\"t m1 x552 he y716 ff1 fs9 fc7 sc0 ls0 ws75\">duration until exercise<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> taking into account the specific </td></tr><tr><td class=\"t m1 x552 he y717 ff1 fs9 fc7 sc0 ls0 ws0\">features of the p<span class=\"_ _4\"></span>lans.<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m1 x553 he y718 ff1 fs9 fc7 sc0 ls0 ws0\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws31\">Risk<span class=\"_ _4\"></span>-free inter<span class=\"_ _4\"></span>est rate \u2013 based on the Belgian go<span class=\"_ _4\"></span>vern<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></span></td></tr><tr><td class=\"t m1 x552 he y719 ff1 fs9 fc7 sc0 ls0 ws39\">ment bond rates at the date of granting with a term </td></tr><tr><td class=\"t m1 x552 he y71a ff1 fs9 fc7 sc0 ls0 ws0\">equal to the expected life of the subscription rights<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></td></tr></table>Movements in the number of subscription rights outstand<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ing and their related w<span class=\"_ _4\"></span>eighted average exercise prices ar<span class=\"_ _4\"></span>e as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span><table class=\"s w20d h6c\" id=\"_7c714e05-b03c-4d67-997b-b6b9644ab0c0\"><tr><td></td><td class=\"c n x554 y71b w61 h41\" colspan=\"2\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x555 y71b w62 h41\" colspan=\"2\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td></td><td class=\"t m1 x556 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">A<span class=\"_ _4\"></span>VERA<span class=\"_ _4\"></span>GE </td><td class=\"t m1 x3a2 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">SUB-<span class=\"ls0 ws0\"> </span></td><td class=\"t m1 x557 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">A<span class=\"_ _4\"></span>VERA<span class=\"_ _4\"></span>GE </td><td class=\"t m1 x558 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">SUB-<span class=\"ls0 ws0\"> </span></td></tr><tr><td></td><td class=\"t m1 x556 h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">EXERCISE </td><td class=\"t m1 x50a h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">SCRIPTION <span class=\"_ _0\"></span><span class=\"ls0 ws0\"> </span></td><td class=\"t m1 x557 h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">EXERCISE </td><td class=\"t m1 x559 h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">SCRIPTION <span class=\"_ _0\"></span><span class=\"ls0 ws0\"> </span></td></tr><tr><td></td><td class=\"t m1 x55a h12 y71e ff3 fsb fc7 sc0 ls1b ws0\">PRICE IN EUR<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x55b h12 y71e ff3 fsb fc7 sc0 ls1b wsbe\">RIGHTS<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x401 h12 y71e ff3 fsb fc7 sc0 ls1b ws0\">PRICE IN EUR<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x55c h12 y71e ff3 fsb fc7 sc0 ls1b wsbe\">RIGHTS<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y71f w3c5 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">As at 1 January<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x55d y71f w3c6 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">2.52<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x55e y71f w3c7 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,131<span class=\"_ _4\"></span>,250<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x55f y71f w3c8 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>.84<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x560 y71f w3c9 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">893,800<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y720 w3ca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Granted<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> accepted<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x561 y720 w3cb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.44<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x562 y720 wca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,000<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x563 y720 w3cc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.11<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x564 y720 w3cd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,431,000<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y721 w3ce h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>orfeited<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x565 y721 w3cf h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.46<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x566 y721 w3d0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-172,970<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x567 y721 w3d1 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3.30<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x568 y721 w3d2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-193<span class=\"_ _4\"></span>,550<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y722 w3d3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Exercised<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x569 y722 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56a y722 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56b y722 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56c y722 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w3d4 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">As at 31 December<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56d y515 w3d5 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2.54<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56e y515 w3d6 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2,959<span class=\"_ _4\"></span>,280<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56f y515 w3d7 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2.52<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x570 y515 w3d8 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">3<span class=\"_ _1\"></span>,131,250<span class=\"_ _1a9\"> </span></div></td></tr></table>Outstanding vested subscription rights at December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> have the f<span class=\"_ _4\"></span>ollowing ear<span class=\"_ _4\"></span>liest exercise date,<span class=\"_ _1\"></span> maturities and exercise prices:<span class=\"_ _1a9\"> </span>EARLIEST EXERCISE D<span class=\"_ _3\"></span>AT<span class=\"_ _5\"> </span>E<span class=\"_ _1a9\"> </span>EXPIRY DA<span class=\"_ _1\"></span>TE<span class=\"_ _1a9\"> </span>EXERCISE PRICE (IN EURO)<span class=\"_ _1a9\"> </span>NUMBER (THOUSANDS)<span class=\"_ _1a9\"> </span>2023<span class=\"_ _11e\"> </span>2027<span class=\"_ _9\"> </span>3<span class=\"_ _4\"></span>.95<span class=\"_ _91\"> </span>692<span class=\"_ _1a9\"> </span>2023<span class=\"_ _179\"> </span>2030<span class=\"_ _91\"> </span>2.57<span class=\"_ _84\"> </span>60<span class=\"_ _1a9\"> </span>2023<span class=\"_ _117\"> </span>203<span class=\"_ _4\"></span>1<span class=\"_ _94\"> </span>2.23<span class=\"_ _fe\"> </span>1,171<span class=\"_ _1a9\"> </span>T<span class=\"_ _1\"></span>otal weighted average<span class=\"_ _1a9\"> </span>2.86<span class=\"_ _80\"> </span>1<span class=\"_ _4\"></span>,923<span class=\"_ _1a9\"> </span>5.7<span class=\"_ _25\"></span>.9 <span class=\"_ _159\"> </span><span class=\"ls18 ws95\">Employee Benefit O<span class=\"_ _3\"></span>bligat<span class=\"_ _4\"></span>ions<span class=\"_ _1a9\"> </span></span>Oxurion offers its emplo<span class=\"_ _4\"></span>yees r<span class=\"_ _4\"></span>etirement benefits that ar<span class=\"_ _4\"></span>e<span class=\"_ _1a9\"> </span>funded through a group insurance p<span class=\"_ _4\"></span>lan managed by an<span class=\"_ _1a9\"> </span>insurance fund<span class=\"_ _1\"></span>. Until June 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2009<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the insur<span class=\"_ _4\"></span>ance group<span class=\"_ _1a9\"> </span>plan w<span class=\"_ _4\"></span>as based on a \u201cdefined benefit\u201d system. In a defined<span class=\"_ _1a9\"> </span>benefit pension plan,<span class=\"_ _1\"></span> an employer commits to paying its<span class=\"_ _1a9\"> </span>emplo<span class=\"_ _4\"></span>yee a specific benefit for lif<span class=\"_ _4\"></span>e beginning at his or her<span class=\"_ _1a9\"> </span>retirement. T<span class=\"_ _4\"></span>he amount of the benefit is known in ad<span class=\"_ _4\"></span>vance,<span class=\"_ _1\"></span> and is usually based on factors suc<span class=\"_ _4\"></span>h as age,<span class=\"_ _1\"></span> earnings,<span class=\"_ _4\"></span> and<span class=\"_ _1a9\"> </span>years of service. Defined benefit plans do not ha<span class=\"_ _4\"></span>ve con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tribution limits,<span class=\"_ _1\"></span> but they do have a limit on the maximum<span class=\"_ _1a9\"> </span>annual retir<span class=\"_ _4\"></span>ement benefit.<span class=\"_ _1a9\"> </span>Since July 1<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2009<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the defined benefit plan w<span class=\"_ _4\"></span>as changed<span class=\"_ _1a9\"> </span>into a pension plan that is structur<span class=\"_ _4\"></span>ed as a defined con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tribution plan,<span class=\"_ _1\"></span> but that should be accounted for as a<span class=\"_ _1a9\"> </span>defined benefit plan in accordance with IFRS<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> since the<span class=\"_ _1a9\"> </span>company offer<span class=\"_ _4\"></span>s a minimum guaranteed return to the p<span class=\"_ _4\"></span>lan<span class=\"_ _1a9\"> </span>participants.<span class=\"_ _1a9\"> </span>The amounts recognized in the statement of financial<span class=\"_ _1a9\"> </span>position can be broken do<span class=\"_ _4\"></span>wn as follows:<span class=\"_ _1a9\"> </span><table class=\"s w3d9 h6d\" id=\"_9c52cadc-e14c-4106-97bf-db1a084b8778\"><tr><td></td><td class=\"c n x571 y723 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x572 y723 w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y724 w3da h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Defined benefit obligation<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x573 y724 w3db h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,707<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x574 y724 w3dc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">5<span class=\"_ _4\"></span>,015<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y725 w3dd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>air value of plan assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x575 y725 w3de h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-4<span class=\"_ _4\"></span>,548<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x576 y725 w3df h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-4,421<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w3e0 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">Net defined benefit liability<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x577 y515 w3e h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">159<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x578 y515 w12a h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">594<span class=\"_ _1a9\"> </span></div></td></tr></table>The amounts recognized in the statement of financi<span class=\"_ _1a9\"> </span>position and the movements in the net defined benef<span class=\"_ _1a9\"> </span>obligations are as f<span class=\"_ _4\"></span>ollows:<table class=\"s w3e1 h6e\" id=\"_509979e4-c730-4426-8ec7-75b20272694f\"><tr><td></td><td class=\"t m1 x579 h12 y726 ff3 fsb fc7 sc0 ls1b wsbe\">PRESENT </td><td class=\"t m1 x57a h12 y727 ff3 fsb fc7 sc0 ls1b ws0\" colspan=\"2\">F<span class=\"_ _1\"></span>AIR V<span class=\"_ _4\"></span>ALUE OF </td></tr><tr><td class=\"t m1 x34d h12 y728 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x524 h12 y728 ff3 fsb fc7 sc0 ls1b ws0\">V<span class=\"_ _4\"></span>ALUE OF </td><td class=\"t m1 x57b h12 y729 ff3 fsb fc7 sc0 ls1b ws0\">PLAN ASSETS<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x3ef h12 y728 ff3 fsb fc7 sc0 ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td class=\"t m1 x57c h12 y72a ff3 fsb fc7 sc0 ls1b wsbe\">OBLIGA<span class=\"_ _1\"></span>TION<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y72b w3e2 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">As at 1 January 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x57d y72b w3e3 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">5,361<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x57e y72b w3e4 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-4,265<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x57f y72b w3e5 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,096<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y72c w3e6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Current service cost<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x580 y72c w92 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">369<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x581 y72c wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x582 h14 y72d ff2 fsd fc7 sc0 ls0 ws0\">369<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y72e w3e7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Past service cost<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x583 y72e wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x584 y72e wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y72f ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y730 w3e8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Interest expense/(income)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x586 y730 w33c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">31<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x587 y730 w23d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-26<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y731 ff2 fsd fc7 sc0 ls0 ws0\">6<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h29 y732 ffa fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal amount recognized in profit </td><td class=\"c n x588 y733 w2c7 h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">400<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x589 y733 w23d h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">-26<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58a h14 y734 ff2 fsd fc7 sc0 ls54 ws25f\">3<span class=\"_ _23\"></span>74<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h29 y735 ffa fsc fc7 sc0 ls0 ws0\">or loss<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c xf0 y736 w3e9 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Actuarial gains/(losses) on<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">DBO due to change in financial<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x588 y736 w123 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-165<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x58b y736 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58c h14 y737 ff2 fsd fc7 sc0 ls0 ws0\">-165<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y738 ff1 fsc fc7 sc0 ls0 ws0\">assumptions<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y739 w3ea h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Changes in return of plan assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x58d y739 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x58e y739 w3eb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-66<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58a h14 y73a ff2 fsd fc7 sc0 ls0 ws0\">-66<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y73b ff1 fsc fc7 sc0 ls0 ws0\">Actuarial gains/(losses) on DBO </td><td class=\"c n x58f y73c w3ec h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-335<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x590 y73c w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x591 h14 y73d ff2 fsd fc7 sc0 ls0 ws0\">-335<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y73e ff1 fsc fc7 sc0 ls0 ws0\">due to experience adjustments<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c xf0 y740 w3ed h6f\"><div class=\"t m2 xca h29 y73f ffa fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal amount recognized in other<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">comprehensive income<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x58f y741 w3ee h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">-500<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x592 y741 w3ef h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">-66<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x591 h14 y742 ff2 fsd fc7 sc0 ls0 ws0\">-566<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y743 w3f0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>er contributions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x593 y743 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x594 y743 w3f1 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-310<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58c h14 y744 ff2 fsd fc7 sc0 ls0 ws0\">-310<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y745 w3f2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee contributions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x595 y745 w209 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">67<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x596 y745 w3f3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-67<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y746 ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y747 w3f4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Benefit payments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x597 y747 w2e6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-214<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x598 y747 w175 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">214<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y748 ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y749 w3f5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>axes on contributions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x599 y749 w3f6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-39<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x59a y749 w11d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">39<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y74a ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c xf0 y74b w3f7 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Insurance premiums related to<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">risk coverages<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x59b y74c w3f8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-61<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x59c y74c w1a5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">61<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y74d ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y74e w3f9 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">As at 31 December 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x59d y74e w3fa h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">5,015<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x59e y74e w3fb h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-4,421<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x59f y74e w3fc h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">594<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y74f w3e6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Current service cost<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a0 y74f wad h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">185<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a1 y74f w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58a h14 y750 ff2 fsd fc7 sc0 ls0 ws0\">185<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y751 w3e7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Past service cost<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x583 y751 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x584 y751 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y752 ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y753 w3e8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Interest expense/(income)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a2 y753 w3fd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">53<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a3 y753 wb5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-47<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x5a4 h14 y754 ff2 fsd fc7 sc0 ls0 ws0\">7<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h29 y755 ffa fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal amount recognized in profit </td><td class=\"c n x588 y756 w3fe h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">238<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a5 y756 wb5 h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">-47<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x5a6 h14 y757 ff2 fsd fc7 sc0 ls0 ws0\">191<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h29 y758 ffa fsc fc7 sc0 ls0 ws0\">or loss<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c xf0 y759 w3e9 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Actuarial gains/(losses) on<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">DBO due to change in financial<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x58f y759 w3ff h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-245<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a7 y759 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x591 h14 y75a ff2 fsd fc7 sc0 ls0 ws0\">-245<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y75b ff1 fsc fc7 sc0 ls0 ws0\">assumptions<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c n xf0 y75c w3ea h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Changes in return of plan assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x58d y75c w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a8 y75c w400 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-45<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58a h14 y75d ff2 fsd fc7 sc0 ls0 ws0\">-45<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y75e ff1 fsc fc7 sc0 ls0 ws0\">Actuarial gains/(losses) on DBO </td><td class=\"c n x58f y75f w401 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-283<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5a9 y75f w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x591 h14 y760 ff2 fsd fc7 sc0 ls0 ws0\">-283<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y761 ff1 fsc fc7 sc0 ls0 ws0\">due to demographic adjustments<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"t m2 x34d h13 y762 ff1 fsc fc7 sc0 ls0 ws0\">Actuarial gains/(losses) on DBO </td><td class=\"c n x5aa y763 w41 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">213<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ab y763 wf9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58a h14 y764 ff2 fsd fc7 sc0 ls0 ws0\">213<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y765 ff1 fsc fc7 sc0 ls0 ws0\">due to experience adjustments<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td></tr><tr><td class=\"c xf0 y766 w3ed h6f\"><div class=\"t m2 xca h29 y73f ffa fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal amount recognized in other<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">comprehensive income<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x588 y767 w1c7 h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">-315<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ac y767 w400 h43\"><div class=\"t m2 xca h29 y53b ffa fsc fc7 sc0 ls0 ws0\">-45<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x58c h14 y768 ff8 fsd fc7 sc0 ls0 ws0\">-361<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y769 w3f0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>er contributions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x593 y769 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ad y769 w223 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-266<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x591 h14 y76a ff2 fsd fc7 sc0 ls0 ws0\">-266<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y76b w3f2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee contributions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ae y76b w65 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">60<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5af y76b w402 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-60<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y76c ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y76d w3f4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Benefit payments<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b0 y76d w403 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-202<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b1 y76d w2e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">202<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y76e ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y76f w3f5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>axes on contributions<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x599 y76f w141 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-34<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b2 y76f w298 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">34<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y770 ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c xf0 y771 w3f7 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Insurance premiums related to<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">risk coverages<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5aa y772 w404 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-54<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b3 y772 w405 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">54<span class=\"_ _1a9\"> </span></div></td><td class=\"t m0 x585 h14 y773 ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y515 w406 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">As at 31 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b4 y515 w407 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">4,707<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b5 y515 w408 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-4,548<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b6 y515 w29b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">159<span class=\"_ _1a9\"> </span></div></td></tr></table>The significant actuarial assumptions used to calculate the<span class=\"_ _1a9\"> </span>net defined benefit liability wer<span class=\"_ _4\"></span>e as follows:<table class=\"s w409 h70\" id=\"_f1f47ca9-20e1-42fb-9eb6-a8dd2a0460ee\"><tr><td></td><td class=\"c n x5b7 y774 w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b8 y774 w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y775 w40a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Discount rate<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5b9 y775 w40b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3.80%<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ba y775 w40c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1.10%<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y776 w40d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Inflation rate short term<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5bb y776 w40e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">9<span class=\"_ _4\"></span>.30%<span class=\"_ _1a9\"> </span></div></td><td class=\"t m2 x5bc h13 y777 ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>.80%<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y616 w40f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Inflation rate long term<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5bd y616 w410 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.50%<span class=\"_ _1a9\"> </span></div></td><td></td></tr><tr><td class=\"c xf0 y618 w411 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Salary increase rate on top of<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">inflation rate<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5be y619 w412 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.00%<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5bf y619 w413 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1.20%<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y778 ff1 fsc fc7 sc0 ls0 ws0\">Mortality tables<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x5c0 h13 y779 ff1 fsc fc7 sc0 ls0 ws0\">MR/FR with age </td><td class=\"t m2 x5c1 h13 y779 ff1 fsc fc7 sc0 ls0 ws0\">MR/FR with age <span class=\"_ _107\"></span> </td></tr><tr><td></td><td class=\"t m2 x3a1 h13 y77a ff1 fsc fc7 sc0 ls0 ws0\">correction of 3 years<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x5c2 h13 y77a ff1 fsc fc7 sc0 ls0 ws0\">correction of 3 years<span class=\"_ _1a9\"> </span></td></tr></table>Sensitivity analysis considering a change of 0<span class=\"_ _25\"></span>.25% in the<span class=\"_ _1a9\"> </span>discount rate (positive = increase net defined benefit liability<span class=\"_ _1a9\"> </span>/ negative = decrease of net defined benefit liability):<span class=\"_ _1a9\"> </span>IN '000 EURO<span class=\"_ _183\"> </span><span class=\"ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _1a9\"> </span></span>DBO considering an increase of 0<span class=\"_ _1\"></span>,25% in the discount rate<span class=\"_ _10f\"> </span>-15<span class=\"_ _1a9\"> </span>DBO considering a decrease of 0<span class=\"_ _1\"></span>,25% in the discount rate<span class=\"_ _151\"> </span>+14<span class=\"_ _1a9\"> </span>The expected future benefits to be paid ar<span class=\"_ _4\"></span>e as follo<span class=\"_ _4\"></span>ws:<table class=\"s w42d h72\" id=\"_4b857bee-141d-4c70-9985-0870570d51a8\"><tr><td class=\"t m1 x12d h12 y79c ff3 fsb fc7 sc0 ls1b ws0\" colspan=\"2\">IN '000 EURO<span class=\"_ _184\"> </span><span class=\"ls0\"> </span></td></tr><tr><td class=\"c n xf0 y79d w42e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2023<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e0 y79d w35a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">120<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6c0 w42f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2024<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e1 y6c0 w430 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">54<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y517 w431 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2025<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e2 y517 wb5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">101<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y518 w2c1 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2026<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e3 y518 wb3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">165<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w432 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2027<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e4 y515 w259 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">233<span class=\"_ _1a9\"> </span></div></td></tr></table>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEmployeeBenefitsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-118": {
   "value": "5.6.9  Employee benefits The average number of full-time equivalents (including executive directors) was as follows: IN NUMBERS 2022 2021 Research and development 27 45 General and administration 7 10 Selling 1 1 Total 35 56 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInformationAboutEmployeesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-123": {
   "value": "5.6.9  Employee benefits IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Wages, salaries and bonuses -4,456 -8,030 Share-based compensation expenses -933 -1,107 Pension costs -203 -391 Total -5,592 -9,528 The pension costs included in the table above consist for 0.149 million euro (2021: 0.374 million euro) of costs related to defined benefit plans and for 0.054 million euro (2021: 0.017 million euro) of costs related to defined contribution plans. We refer to note 5.7.9 for more information on the defined benefit plans. The average number of full-time equivalents (including executive directors) was as follows: IN NUMBERS 2022 2021 Research and development 27 45 General and administration 7 10 Selling 1 1 Total 35 56 The share-based compensation expense included in the statement of profit and loss is given below: N '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Research and development expenses 427 289 General and administrative expenses 495 798 Selling expenses 11 20 Total 933 1,107 We refer to note 5.7.8, for further information regarding the share-based payment plans. 5.6.10  Taxes IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Current tax expense -7 -3 Deferred tax expense 0 0 Tax expenses in income statement -7 -3 Effective tax rate 0.0% 0.0% The tax expense as shown above has been calculated in conformity with local and international tax laws. The tax on the Company\u2019s loss (-)/ profit before tax differs from the theoretical amount that would arise using the domestic rate in Belgium on loss (-) / profit of the year and is as follows: IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Loss (-) / profit before tax -31,686 -29,592 Expected tax based on tax rate of the parent 7,921 7,398 company (25% - theoretical) Disallowed expenses -231 -51 Tax deductions and non-taxable income 152 144 Change in unrecognized deferred taxes -5,961 -9,947 Difference in tax rates from other jurisdictions 0 -6 Permanent differences -1,888 2,459 Tax expense of the year (effective) -7 -3 The main difference between the theoretical tax and the effective tax for the year 2021 and 2022 can be primarily explained by the unrecognized deferred taxes for which the Company conservatively assesses that it is not likely that these will be utilized in the foreseeable future . 5.7.9  Employee Benefit Obligations Oxurion offers its employees retirement benefits that are  funded through a group insurance plan managed by an  insurance fund. Until June 30, 2009, the insurance group  plan was based on a \u201cdefined benefit\u201d system. In a defined  benefit pension plan, an employer commits to paying its  employee a specific benefit for life beginning at his or her  retirement. The amount of the benefit is known in advance, and is usually based on factors such as age, earnings, and  years of service. Defined benefit plans do not have con- tribution limits, but they do have a limit on the maximum  annual retirement benefit. Since July 1, 2009, the defined benefit plan was changed  into a pension plan that is structured as a defined con- tribution plan, but that should be accounted for as a  defined benefit plan in accordance with IFRS, since the  company offers a minimum guaranteed return to the plan  participants.  The amounts recognized in the statement of financial  position can be broken down as follows: 2022 2021 Defined benefit obligation 4,707 5,015 Fair value of plan assets -4,548 -4,421 Net defined benefit liability 159 594 The amounts recognized in the statement of financi al position and the movements in the net defined benef it obligations are as follows: PRESENT FAIR VALUE OF IN '000 EURO VALUE OF PLAN ASSETS TOTAL OBLIGATION As at 1 January 2021 5,361 -4,265 1,096 Current service cost 369 0 369 Past service cost 0 0 0 Interest expense/(income) 31 -26 6 Total amount recognized in profit 400 -26 374 or loss Actuarial gains/(losses) on DBO due to change in financial -165 0 -165 assumptions Changes in return of plan assets 0 -66 -66 Actuarial gains/(losses) on DBO -335 0 -335 due to experience adjustments Total amount recognized in other comprehensive income -500 -66 -566 Employer contributions 0 -310 -310 Employee contributions 67 -67 0 Benefit payments -214 214 0 Taxes on contributions -39 39 0 Insurance premiums related to risk coverages -61 61 0 As at 31 December 2021 5,015 -4,421 594 Current service cost 185 0 185 Past service cost 0 0 0 Interest expense/(income) 53 -47 7 Total amount recognized in profit 238 -47 191 or loss Actuarial gains/(losses) on DBO due to change in financial -245 0 -245 assumptions Changes in return of plan assets 0 -45 -45 Actuarial gains/(losses) on DBO -283 0 -283 due to demographic adjustments Actuarial gains/(losses) on DBO 213 0 213 due to experience adjustments Total amount recognized in other comprehensive income -315 -45 -361 Employer contributions 0 -266 -266 Employee contributions 60 -60 0 Benefit payments -202 202 0 Taxes on contributions -34 34 0 Insurance premiums related to risk coverages -54 54 0 As at 31 December 2022 4,707 -4,548 159 The significant actuarial assumptions used to calculate the  net defined benefit liability were as follows: 2022 2021 Discount rate 3.80% 1.10% Inflation rate short term 9.30% 1.80% Inflation rate long term 2.50% Salary increase rate on top of inflation rate 2.00% 1.20% Mortality tables MR/FR with age MR/FR with age  correction of 3 years correction of 3 years Sensitivity analysis considering a change of 0.25% in the  discount rate (positive = increase net defined benefit liability  / negative = decrease of net defined benefit liability): IN '000 EURO TOTAL DBO considering an increase of 0,25% in the discount rate -15 DBO considering a decrease of 0,25% in the discount rate +14 The expected future benefits to be paid are as follows: IN '000 EURO  2023 120 2024 54 2025 101 2026 165 2027 233 5.7.10   Other short-term liabilities IN '000 EURO (AS AT 31 2022 2021 DECEMBER) Employee benefits 548 1,684 Other current liabilities 2,813 628 Total other short-term 3,361 2,312 liabilities Oxurion\u2019s Defined Benefit Obligation (\u201cDBO\u201d) is a non-cur- rent liability. Employee benefits include holiday pay, bonus, and out- standing employee taxes. The other current liabilities consist of commitments that expire before year-end, but for which an invoice was not yet received. Contingent liability The expenses incurred in several of the Group\u2019s research and development programs have been reimbursed by VLAIO, formerly known as IWT, as a government grant. Contracts with VLAIO generally include a clause that defines the need for validation of the project results in order for the grant to be effectively earned. Should this validation not occur, VLAIO has the right to reclaim the funds previously granted. The Group considers this as a remote possibility. Please refer to the accounting policy described in section 5.5.3 (G) and the rationale used in order to recognize grant income over the course of the project. Total amounts received in 2021 with respect to government grants from VLAIO amount to 0.228 million euro. No amounts were received in 2022. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfProvisionsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-137": {
   "value": "5.6.9  Employee benefits IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Wages, salaries and bonuses -4,456 -8,030 Share-based compensation expenses -933 -1,107 Pension costs -203 -391 Total -5,592 -9,528 The pension costs included in the table above consist for 0.149 million euro (2021: 0.374 million euro) of costs related to defined benefit plans and for 0.054 million euro (2021: 0.017 million euro) of costs related to defined contribution plans. We refer to note 5.7.9 for more information on the defined benefit plans. The average number of full-time equivalents (including executive directors) was as follows: IN NUMBERS 2022 2021 Research and development 27 45 General and administration 7 10 Selling 1 1 Total 35 56 The share-based compensation expense included in the statement of profit and loss is given below: N '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Research and development expenses 427 289 General and administrative expenses 495 798 Selling expenses 11 20 Total 933 1,107 We refer to note 5.7.8, for further information regarding the share-based payment plans. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfExpensesByNatureExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-46": {
   "value": "5.6.10  Taxes IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Current tax expense -7 -3 Deferred tax expense 0 0 Tax expenses in income statement -7 -3 Effective tax rate 0.0% 0.0% The tax expense as shown above has been calculated in conformity with local and international tax laws. The tax on the Company\u2019s loss (-)/ profit before tax differs from the theoretical amount that would arise using the domestic rate in Belgium on loss (-) / profit of the year and is as follows: IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Loss (-) / profit before tax -31,686 -29,592 Expected tax based on tax rate of the parent 7,921 7,398 company (25% - theoretical) Disallowed expenses -231 -51 Tax deductions and non-taxable income 152 144 Change in unrecognized deferred taxes -5,961 -9,947 Difference in tax rates from other jurisdictions 0 -6 Permanent differences -1,888 2,459 Tax expense of the year (effective) -7 -3 The main difference between the theoretical tax and the effective tax for the year 2021 and 2022 can be primarily explained by the unrecognized deferred taxes for which the Company conservatively assesses that it is not likely that these will be utilized in the foreseeable future . 5.7.12  Deferred taxes Deferred tax assets have not been recognized in respect of the items below because it is not probable that future taxable profits will be available against which the Group can utilize the loss carryforwards or deductible temporary differences. The losses available for offsetting future taxable income are mainly related to Belgium. In '000 euro (as at 31 December) 2022 2021 Losses available for offsetting against future taxable income 361,140 342,145 Deductible temporary differences 18,056 24,518 Taxable temporary differences 0 -46 Total unused tax losses and other deductible temporary differences not 379,196 366,617 recognized No deferred tax liability is recognized on the unremitted earnings of subsidiaries since no tax is expected to be payable on them in the foreseeable future ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDeferredTaxesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-77": {
   "value": "5.6.10  Taxes IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Current tax expense -7 -3 Deferred tax expense 0 0 Tax expenses in income statement -7 -3 Effective tax rate 0.0% 0.0% The tax expense as shown above has been calculated in conformity with local and international tax laws. The tax on the Company\u2019s loss (-)/ profit before tax differs from the theoretical amount that would arise using the domestic rate in Belgium on loss (-) / profit of the year and is as follows: IN '000 EURO (FOR THE YEAR ENDED 31 DECEMBER) 2022 2021 Loss (-) / profit before tax -31,686 -29,592 Expected tax based on tax rate of the parent 7,921 7,398 company (25% - theoretical) Disallowed expenses -231 -51 Tax deductions and non-taxable income 152 144 Change in unrecognized deferred taxes -5,961 -9,947 Difference in tax rates from other jurisdictions 0 -6 Permanent differences -1,888 2,459 Tax expense of the year (effective) -7 -3 The main difference between the theoretical tax and the effective tax for the year 2021 and 2022 can be primarily explained by the unrecognized deferred taxes for which the Company conservatively assesses that it is not likely that these will be utilized in the foreseeable future 5.7.12  Deferred taxes Deferred tax assets have not been recognized in respect of the items below because it is not probable that future taxable profits will be available against which the Group can utilize the loss carryforwards or deductible temporary differences. The losses available for offsetting future taxable income are mainly related to Belgium. In '000 euro (as at 31 December) 2022 2021 Losses available for offsetting against future taxable income 361,140 342,145 Deductible temporary differences 18,056 24,518 Taxable temporary differences 0 -46 Total unused tax losses and other deductible temporary differences not 379,196 366,617 recognized No deferred tax liability is recognized on the unremitted earnings of subsidiaries since no tax is expected to be payable on them in the foreseeable future ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-47": {
   "value": "5.6.11  Result per share Earnings per share The calculation of basic earnings/loss per share on December 31, 2022, is based on the holders of ordinary shares attributable loss (-) / profit from 2022 (31.693) million euro (2021: (29.595) million euro) and a weighted average number of ordinary shares outstanding during 2022 of 85,019,833 (2021: 38,410,532), calculated as follows: 2022 2021 Issued ordinary shares per 1 January 39,067,284 38,291,950 Effect of capital increases through issue of shares 45,952,549 118,582 Average number of ordinary shares per  85,019,833 38,410,532 31 December IN '000 EURO, EXCEPT FOR RESULT PER SHARE 2022 2021 Result of the year -31,693 -29,595 Basic/Diluted result per share -0.37 -0.77 As consideration in exchange for services performed, the Group has granted subscription rights to buy ordinary shares to the CEO and personnel. In addition, the Group also has convertible loans with Negma and Kreos/Pontifax (see note 5.7.11) for which potential ordinary shares can be issued upon conversion. The effect of these potential ordinary shares is anti-dilutive as there was a loss in 2022 and 2021. As such, the diluted earnings per share are the same as the basic earnings per share. See note 5.7.8 for an overview of the number of outstand- ing subscription rights at each year-end",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEarningsPerShareExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-48": {
   "value": "5.7  NOTES TO THE CONSOLIDATED STATEMENT OF FINANCIAL POSITION 5.7.1  Property, plant and equipment IN '000 EURO MACHINES, PLANT FURNITURE AND TOTAL AND EQUIPMENT FITTINGS As at 1 January 2021      Cost 6,674 4,310 10,984 Accumulated depreciation and disposals -6,469 -4,276 -10,745 Exchange differences -26 17 -9 Net carrying amount 179 51 230 Year ended on 31 December 2021 Additions 25 7 32 Depreciation expenses -47 -30 -77 Disposals -60 -8 -68 Exchange differences 0 3 3 Net carrying amount 97 23 120 As at 31 December 2021 Cost 6,699 4,317 11,016 Accumulated depreciation and disposals -6,576 -4,314 -10,890 Exchange differences -26 20 -6 Net carrying amount 97 23 120 Year ended on 31 December 2022 Additions 28 31 59 Depreciation expenses -45 -18 -63 Disposals -9 -7 -16 Exchange differences 0 -1 -1 Net carrying amount 71 28 99 As at 31 December 2022 Cost 6,727 4,348 11,075 Accumulated depreciation and disposals -6,630 -4,339 -10,969 Exchange differences -26 19 -7 Net carrying amount 71 28 99 At December 31, 2022, property, plant and equipment with an original cost of 2.5 million euro (2021: 3.4 million euro) that has already been fully depreciated is still in use. No property, plant and equipment is pledged or in limited use . ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfPropertyPlantAndEquipmentExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-119": {
   "value": "5.7.1  Property, plant and equipment IN '000 EURO MACHINES, PLANT FURNITURE AND TOTAL AND EQUIPMENT FITTINGS As at 1 January 2021      Cost 6,674 4,310 10,984 Accumulated depreciation and disposals -6,469 -4,276 -10,745 Exchange differences -26 17 -9 Net carrying amount 179 51 230 Year ended on 31 December 2021 Additions 25 7 32 Depreciation expenses -47 -30 -77 Disposals -60 -8 -68 Exchange differences 0 3 3 Net carrying amount 97 23 120 As at 31 December 2021 Cost 6,699 4,317 11,016 Accumulated depreciation and disposals -6,576 -4,314 -10,890 Exchange differences -26 20 -6 Net carrying amount 97 23 120 Year ended on 31 December 2022 Additions 28 31 59 Depreciation expenses -45 -18 -63 Disposals -9 -7 -16 Exchange differences 0 -1 -1 Net carrying amount 71 28 99 As at 31 December 2022 Cost 6,727 4,348 11,075 Accumulated depreciation and disposals -6,630 -4,339 -10,969 Exchange differences -26 19 -7 Net carrying amount 71 28 99 At December 31, 2022, property, plant and equipment with an original cost of 2.5 million euro (2021: 3.4 million euro) that  has already been fully depreciated is still in use. No property, plant and equipment is pledged or in limited use . 5.7. 2  Leases IN \u2018000 EURO LAND AND PROPERTY, PLANT TOTAL BUILDINGS AND EQUIPMENT Right-of-use assets As at January 1, 2021 817 252 1,069 Additions 0 34 34 Amortization -466 -134 -600 Modification* -251 0 -251 As at December 31, 2021 100 152 252 As at January 1, 2022 100 152 252 Additions 924 77 1,001 Amortization -171 -119 -290 Modification 0 0 0 As at December 31, 2022 853 110 963 Lease liabilities      As at January 1, 2021 842 254 1,096 Additions 0 34 34 Lease payments -463 -136 -599 Modification* -266 0 -266 As at December 31, 2021 113 152 265 Of which are:      current lease liabilities 113 108 221 non-current lease liabilities 0 44 44 total 113 152 265 As at January 1, 2022 113 152 265 Additions 924 77 1,001 Lease payments -172 -122 -294 Modification 0 0 0 As at December 31, 2022 865 107 972 Of which are:      current lease liabilities 92 47 139 non-current lease liabilities 773 60 833 total 865 107 972 (*) Oxurion decided to focus on its clinical development strategy and decided to terminate part of the lease agreement with Bio-Incubator The lease payments in the table above of 0.294 million euro (2021: 0.599 million euro) are reconciled to the line item \u2018Principal paid on lease liabilities\u2019 in the consolidated statement of cash flows. The amortization of the right-of-use assets is reconciled to the line item \u2018Amortization of right-of-use assets\u2019 in the consolidated statement of cash flows. On December 31, 2022, Oxurion had outstanding lease obligations, which become due as follows: UP TO 3 BETWEEN BETWEEN BETWEEN OVER 5 IN \u2018000 EURO MONTHS 3 AND 12 1 AND 2 2 AND 5 YEARS MONTHS YEAR(S) YEARS Lease obligations 39 100 121 338 374 5.7. 3  Intangible assets INTERNALLY IN '000 EURO GENERATED LICENSE NUVUE LICENSE GRIFOLS LICENSE LICENSE VIB LICENSES OTHER TOTAL MICROPLASMIN GALAPAGOS PHASE III As at 1 January 2021 Cost 53,597 12,019 9,935 1,000 1,252 168 77,971 Accumulated amortization expenses -22,700 -6,578 -5,381 0 0 -168 -34,827 Accumulated impairment losses -30,897 -5,441 -4,554 0 -125 0 -41,017 Net carrying amount 0 0 0 1,000 1,127 0 2,127 Year ended December 31, 2021 Additions 0 0 0 0 0 0 0 Disposals 0 0 0 0 0 0 0 Amortization expenses 0 0 0 0 0 0 0 Impairment losses 0 0 0 0 -1,127 0 -1,127 Net carrying amount 0 0 0 1,000 0 0 1,000 As at December 31, 2021 Cost 53,597 12,019 9,935 1,000 1,252 168 77,971 Accumulated amortization expenses -22,700 -6,578 -5,381 0 0 -168 -34,827 Accumulated impairment losses -30,897 -5,441 -4,554 0 -1,252 0 -42,144 Net carrying amount 0 0 0 1,000 0 0 1,000 For the period ended on December 31, 2022 Additions 0 0 0 0 0 0 0 Disposals 0 0 0 0 0 0 0 Amortization expenses 0 0 0 0 0 0 0 Impairment losses 0 0 0 -1,000 0 0 -1,000 Net carrying amount 0 0 0 0 0 0 0 As at December 31, 2022 Cost 53,597 12,019 9,935 1,000 1,252 168 77,971 Accumulated amortization expenses -22,700 -6,578 -5,381 0 0 -168 -34,827 Accumulated impairment losses -30,897 -5,441 -4,554 -1,000 -1,252 0 -43,144 Net carrying amount 0 0 0 0 0 0 0 Intangible assets with definite useful lives: In the development of JETREA\u00ae, Oxurion has capital- ized ocriplasmin clinical trial costs (internally generated  Microplasmin Phase 3), and two externally acquired  licenses that were used for development of JETREA\u00ae:  NuVue and Grifols. The capitalized costs were amortized  from the date of commercialization of JETREA\u00ae in 2013, over the life of the patent, which was determined to be  11.8 years, but as there was an impairment indicator, they  were fully impaired before that date. We refer to the ac- counting policy section for more details on ocriplasmin. Intangible assets pledged: In the context of the Kreos/Pontifax convertible bond, the  Group has created a pledge up to 10 million euro over (i)  the Company\u2019s business, including its intellectual property, and (ii) the patents and patent application in families  WO2020043533 and WO2005123734, relating to THR  687, which have been registered in the Belgian national  pledge register. In addition, a pledge is registered over the  US patent 10,703,752 (application 16/554,259 filed on  August 19, 2019), relating to THR 687, in the United States  Patent and Trademark Office ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDepreciationAndAmortisationExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-49": {
   "value": "5.7. 2  Leases IN \u2018000 EURO LAND AND PROPERTY, PLANT TOTAL BUILDINGS AND EQUIPMENT Right-of-use assets As at January 1, 2021 817 252 1,069 Additions 0 34 34 Amortization -466 -134 -600 Modification* -251 0 -251 As at December 31, 2021 100 152 252 As at January 1, 2022 100 152 252 Additions 924 77 1,001 Amortization -171 -119 -290 Modification 0 0 0 As at December 31, 2022 853 110 963 Lease liabilities      As at January 1, 2021 842 254 1,096 Additions 0 34 34 Lease payments -463 -136 -599 Modification* -266 0 -266 As at December 31, 2021 113 152 265 Of which are:      current lease liabilities 113 108 221 non-current lease liabilities 0 44 44 total 113 152 265 As at January 1, 2022 113 152 265 Additions 924 77 1,001 Lease payments -172 -122 -294 Modification 0 0 0 As at December 31, 2022 865 107 972 Of which are:      current lease liabilities 92 47 139 non-current lease liabilities 773 60 833 total 865 107 972 (*) Oxurion decided to focus on its clinical development strategy and decided to terminate part of the lease agreement with Bio-Incubator The lease payments in the table above of 0.294 million euro (2021: 0.599 million euro) are reconciled to the line item \u2018Principal paid on lease liabilities\u2019 in the consolidated statement of cash flows. The amortization of the right-of-use assets is reconciled to the line item \u2018Amortization of right-of-use assets\u2019 in the consolidated statement of cash flows. On December 31, 2022, Oxurion had outstanding lease obligations, which become due as follows: UP TO 3 BETWEEN BETWEEN BETWEEN OVER 5 IN \u2018000 EURO MONTHS 3 AND 12 1 AND 2 2 AND 5 YEARS MONTHS YEAR(S) YEARS Lease obligations 39 100 121 338 374 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfLeasesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-105": {
   "value": "5.7. 3  Intangible assets INTERNALLY IN '000 EURO GENERATED LICENSE NUVUE LICENSE GRIFOLS LICENSE LICENSE VIB LICENSES OTHER TOTAL MICROPLASMIN GALAPAGOS PHASE III As at 1 January 2021 Cost 53,597 12,019 9,935 1,000 1,252 168 77,971 Accumulated amortization expenses -22,700 -6,578 -5,381 0 0 -168 -34,827 Accumulated impairment losses -30,897 -5,441 -4,554 0 -125 0 -41,017 Net carrying amount 0 0 0 1,000 1,127 0 2,127 Year ended December 31, 2021 Additions 0 0 0 0 0 0 0 Disposals 0 0 0 0 0 0 0 Amortization expenses 0 0 0 0 0 0 0 Impairment losses 0 0 0 0 -1,127 0 -1,127 Net carrying amount 0 0 0 1,000 0 0 1,000 As at December 31, 2021 Cost 53,597 12,019 9,935 1,000 1,252 168 77,971 Accumulated amortization expenses -22,700 -6,578 -5,381 0 0 -168 -34,827 Accumulated impairment losses -30,897 -5,441 -4,554 0 -1,252 0 -42,144 Net carrying amount 0 0 0 1,000 0 0 1,000 For the period ended on December 31, 2022 Additions 0 0 0 0 0 0 0 Disposals 0 0 0 0 0 0 0 Amortization expenses 0 0 0 0 0 0 0 Impairment losses 0 0 0 -1,000 0 0 -1,000 Net carrying amount 0 0 0 0 0 0 0 As at December 31, 2022 Cost 53,597 12,019 9,935 1,000 1,252 168 77,971 Accumulated amortization expenses -22,700 -6,578 -5,381 0 0 -168 -34,827 Accumulated impairment losses -30,897 -5,441 -4,554 -1,000 -1,252 0 -43,144 Net carrying amount 0 0 0 0 0 0 0 Intangible assets with definite useful lives: In the development of JETREA\u00ae, Oxurion has capital- ized ocriplasmin clinical trial costs (internally generated  Microplasmin Phase 3), and two externally acquired  licenses that were used for development of JETREA\u00ae:  NuVue and Grifols. The capitalized costs were amortized  from the date of commercialization of JETREA\u00ae in 2013, over the life of the patent, which was determined to be  11.8 years, but as there was an impairment indicator, they  were fully impaired before that date. We refer to the ac- counting policy section for more details on ocriplasmin. Intangible assets pledged: In the context of the Kreos/Pontifax convertible bond, the  Group has created a pledge up to 10 million euro over (i)  the Company\u2019s business, including its intellectual property, and (ii) the patents and patent application in families  WO2020043533 and WO2005123734, relating to THR  687, which have been registered in the Belgian national  pledge register. In addition, a pledge is registered over the  US patent 10,703,752 (application 16/554,259 filed on  August 19, 2019), relating to THR 687, in the United States  Patent and Trademark Office . Intangible assets with indefinite useful lives: The Galapagos License relates to an externally acquired license by Oxurion in relation to program THR-687, for the development and commercialization of integrin antago- nists. The Part A data showed THR-687 to be safe and well tolerated with no serious adverse events and none of the patients required rescue medication through Month 3, however, there was insufficient evidence of efficacy on the key endpoints (Best Corrected Visual Acuity and Central Subfield Thickness). As a result, Oxurion has decided not to advance THR-687 to Part B of the INTEGRAL trial. The Galapagos License was there for fully impaired as per December 31, 2022. For more details on the agreement and accounting policy treatment, we refer to note 5.8 under key arrangements section. The VIB license relates to an externally acquired license by Oncurious for a portfolio of five unique next generation immuno-oncology assets which are being used in further development. This asset was given as a contribution in kind by VIB and was capitalized based on fair value deter- mined by an independent valuator. The license is impaired as per June 30, 2021, as Oxurion would no longer make direct investments in these assets. The Company also explored the option of taking on an additional investor in Oncurious, but was unable to secure a transaction under acceptable terms. For more details on the agreement and accounting policy treatment, refer to note 5.8 under key arrangements section. Besides the portfolio of five immu- no-oncology assets the VIB License column also contains TB-403 with a gross book value of 0.125 million euro, which was impaired during 2020. Impairment test at December 31, 2022 Indefinite life intangible assets are tested for impairment annually since these are not subject to amortization. Definite lived intangible assets are tested for impairment if indicators exist. The Galapagos license was fully impaired (1 million euro) given the announcement in the first half of 2022 that Oxurion has decided not to advance THR-687 to part B of the INTEGRAL trial. The VIB IP license has been fully impaired as per June 30, 2021, as a result of the existence of an impairment indicator given the announcement in the first half of 2021 that Oxurion would no longer make direct investments in Oncurious (oncology), and as a result the oncology assets were impaired in the amount of 1.127 million euro ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIntangibleAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-130": {
   "value": "5.7. 3  Intangible assets INTERNALLY IN '000 EURO GENERATED LICENSE NUVUE LICENSE GRIFOLS LICENSE LICENSE VIB LICENSES OTHER TOTAL MICROPLASMIN GALAPAGOS PHASE III As at 1 January 2021 Cost 53,597 12,019 9,935 1,000 1,252 168 77,971 Accumulated amortization expenses -22,700 -6,578 -5,381 0 0 -168 -34,827 Accumulated impairment losses -30,897 -5,441 -4,554 0 -125 0 -41,017 Net carrying amount 0 0 0 1,000 1,127 0 2,127 Year ended December 31, 2021 Additions 0 0 0 0 0 0 0 Disposals 0 0 0 0 0 0 0 Amortization expenses 0 0 0 0 0 0 0 Impairment losses 0 0 0 0 -1,127 0 -1,127 Net carrying amount 0 0 0 1,000 0 0 1,000 As at December 31, 2021 Cost 53,597 12,019 9,935 1,000 1,252 168 77,971 Accumulated amortization expenses -22,700 -6,578 -5,381 0 0 -168 -34,827 Accumulated impairment losses -30,897 -5,441 -4,554 0 -1,252 0 -42,144 Net carrying amount 0 0 0 1,000 0 0 1,000 For the period ended on December 31, 2022 Additions 0 0 0 0 0 0 0 Disposals 0 0 0 0 0 0 0 Amortization expenses 0 0 0 0 0 0 0 Impairment losses 0 0 0 -1,000 0 0 -1,000 Net carrying amount 0 0 0 0 0 0 0 As at December 31, 2022 Cost 53,597 12,019 9,935 1,000 1,252 168 77,971 Accumulated amortization expenses -22,700 -6,578 -5,381 0 0 -168 -34,827 Accumulated impairment losses -30,897 -5,441 -4,554 -1,000 -1,252 0 -43,144 Net carrying amount 0 0 0 0 0 0 0 Intangible assets with definite useful lives: In the development of JETREA\u00ae, Oxurion has capital- ized ocriplasmin clinical trial costs (internally generated  Microplasmin Phase 3), and two externally acquired  licenses that were used for development of JETREA\u00ae:  NuVue and Grifols. The capitalized costs were amortized  from the date of commercialization of JETREA\u00ae in 2013, over the life of the patent, which was determined to be  11.8 years, but as there was an impairment indicator, they  were fully impaired before that date. We refer to the ac- counting policy section for more details on ocriplasmin. Intangible assets pledged: In the context of the Kreos/Pontifax convertible bond, the  Group has created a pledge up to 10 million euro over (i)  the Company\u2019s business, including its intellectual property, and (ii) the patents and patent application in families  WO2020043533 and WO2005123734, relating to THR  687, which have been registered in the Belgian national  pledge register. In addition, a pledge is registered over the  US patent 10,703,752 (application 16/554,259 filed on  August 19, 2019), relating to THR 687, in the United States  Patent and Trademark Office . Intangible assets with indefinite useful lives: The Galapagos License relates to an externally acquired license by Oxurion in relation to program THR-687, for the development and commercialization of integrin antago- nists. The Part A data showed THR-687 to be safe and well tolerated with no serious adverse events and none of the patients required rescue medication through Month 3, however, there was insufficient evidence of efficacy on the key endpoints (Best Corrected Visual Acuity and Central Subfield Thickness). As a result, Oxurion has decided not to advance THR-687 to Part B of the INTEGRAL trial. The Galapagos License was there for fully impaired as per December 31, 2022. For more details on the agreement and accounting policy treatment, we refer to note 5.8 under key arrangements section. The VIB license relates to an externally acquired license by Oncurious for a portfolio of five unique next generation immuno-oncology assets which are being used in further development. This asset was given as a contribution in kind by VIB and was capitalized based on fair value deter- mined by an independent valuator. The license is impaired as per June 30, 2021, as Oxurion would no longer make direct investments in these assets. The Company also explored the option of taking on an additional investor in Oncurious, but was unable to secure a transaction under acceptable terms. For more details on the agreement and accounting policy treatment, refer to note 5.8 under key arrangements section. Besides the portfolio of five immu- no-oncology assets the VIB License column also contains TB-403 with a gross book value of 0.125 million euro, which was impaired during 2020. Impairment test at December 31, 2022 Indefinite life intangible assets are tested for impairment annually since these are not subject to amortization. Definite lived intangible assets are tested for impairment if indicators exist. The Galapagos license was fully impaired (1 million euro) given the announcement in the first half of 2022 that Oxurion has decided not to advance THR-687 to part B of the INTEGRAL trial. The VIB IP license has been fully impaired as per June 30, 2021, as a result of the existence of an impairment indicator given the announcement in the first half of 2021 that Oxurion would no longer make direct investments in Oncurious (oncology), and as a result the oncology assets were impaired in the amount of 1.127 million euro ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIntangibleAssetsAndGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-22": {
   "value": "5.7. 3  Intangible assets INTERNALLY IN '000 EURO GENERATED LICENSE NUVUE LICENSE GRIFOLS LICENSE LICENSE VIB LICENSES OTHER TOTAL MICROPLASMIN GALAPAGOS PHASE III As at 1 January 2021 Cost 53,597 12,019 9,935 1,000 1,252 168 77,971 Accumulated amortization expenses -22,700 -6,578 -5,381 0 0 -168 -34,827 Accumulated impairment losses -30,897 -5,441 -4,554 0 -125 0 -41,017 Net carrying amount 0 0 0 1,000 1,127 0 2,127 Year ended December 31, 2021 Additions 0 0 0 0 0 0 0 Disposals 0 0 0 0 0 0 0 Amortization expenses 0 0 0 0 0 0 0 Impairment losses 0 0 0 0 -1,127 0 -1,127 Net carrying amount 0 0 0 1,000 0 0 1,000 As at December 31, 2021 Cost 53,597 12,019 9,935 1,000 1,252 168 77,971 Accumulated amortization expenses -22,700 -6,578 -5,381 0 0 -168 -34,827 Accumulated impairment losses -30,897 -5,441 -4,554 0 -1,252 0 -42,144 Net carrying amount 0 0 0 1,000 0 0 1,000 For the period ended on December 31, 2022 Additions 0 0 0 0 0 0 0 Disposals 0 0 0 0 0 0 0 Amortization expenses 0 0 0 0 0 0 0 Impairment losses 0 0 0 -1,000 0 0 -1,000 Net carrying amount 0 0 0 0 0 0 0 As at December 31, 2022 Cost 53,597 12,019 9,935 1,000 1,252 168 77,971 Accumulated amortization expenses -22,700 -6,578 -5,381 0 0 -168 -34,827 Accumulated impairment losses -30,897 -5,441 -4,554 -1,000 -1,252 0 -43,144 Net carrying amount 0 0 0 0 0 0 0 Intangible assets with definite useful lives: In the development of JETREA\u00ae, Oxurion has capital- ized ocriplasmin clinical trial costs (internally generated Microplasmin Phase 3), and two externally acquired licenses that were used for development of JETREA\u00ae: NuVue and Grifols. The capitalized costs were amortized from the date of commercialization of JETREA\u00ae in 2013, over the life of the patent, which was determined to be 11.8 years, but as there was an impairment indicator, they were fully impaired before that date. We refer to the ac- counting policy section for more details on ocriplasmin. Intangible assets pledged: In the context of the Kreos/Pontifax convertible bond, the Group has created a pledge up to 10 million euro over (i) the Company\u2019s business, including its intellectual property, and (ii) the patents and patent application in families WO2020043533 and WO2005123734, relating to THR 687, which have been registered in the Belgian national pledge register. In addition, a pledge is registered over the US patent 10,703,752 (application 16/554,259 filed on August 19, 2019), relating to THR 687, in the United States Patent and Trademark Office . Intangible assets with indefinite useful lives: The Galapagos License relates to an externally acquired license by Oxurion in relation to program THR-687, for the development and commercialization of integrin antago- nists. The Part A data showed THR-687 to be safe and well tolerated with no serious adverse events and none of the patients required rescue medication through Month 3, however, there was insufficient evidence of efficacy on the key endpoints (Best Corrected Visual Acuity and Central Subfield Thickness). As a result, Oxurion has decided not to advance THR-687 to Part B of the INTEGRAL trial. The Galapagos License was there for fully impaired as per December 31, 2022. For more details on the agreement and accounting policy treatment, we refer to note 5.8 under key arrangements section. The VIB license relates to an externally acquired license by Oncurious for a portfolio of five unique next generation immuno-oncology assets which are being used in further development. This asset was given as a contribution in kind by VIB and was capitalized based on fair value deter- mined by an independent valuator. The license is impaired as per June 30, 2021, as Oxurion would no longer make direct investments in these assets. The Company also explored the option of taking on an additional investor in Oncurious, but was unable to secure a transaction under acceptable terms. For more details on the agreement and accounting policy treatment, refer to note 5.8 under key arrangements section. Besides the portfolio of five immu- no-oncology assets the VIB License column also contains TB-403 with a gross book value of 0.125 million euro, which was impaired during 2020. Impairment test at December 31, 2022 Indefinite life intangible assets are tested for impairment annually since these are not subject to amortization. Definite lived intangible assets are tested for impairment if indicators exist. The Galapagos license was fully impaired (1 million euro) given the announcement in the first half of 2022 that Oxurion has decided not to advance THR-687 to part B of the INTEGRAL trial. The VIB IP license has been fully impaired as per June 30, 2021, as a result of the existence of an impairment indicator given the announcement in the first half of 2021 that Oxurion would no longer make direct investments in Oncurious (oncology), and as a result the oncology assets were impaired in the amount of 1.127 million euro ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfImpairmentOfAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-92": {
   "value": "ntangible assets pledged: In the context of the Kreos/Pontifax convertible bond, the  Group has created a pledge up to 10 million euro over (i)  the Company\u2019s business, including its intellectual property, and (ii) the patents and patent application in families  WO2020043533 and WO2005123734, relating to THR  687, which have been registered in the Belgian national  pledge register. In addition, a pledge is registered over the  US patent 10,703,752 (application 16/554,259 filed on  August 19, 2019), relating to THR 687, in the United States  Patent and Trademark Office ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCollateralExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-23": {
   "value": "5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _27\"></span>4<span class=\"_ _2f\"></span> <span class=\"_ _159\"> </span><span class=\"ls0 ws0\">T<span class=\"_ _25\"></span>rade and oth<span class=\"_ _4\"></span>er recei<span class=\"_ _4\"></span>vabl<span class=\"_ _4\"></span>es, non-<span class=\"_ _1a9\"> </span></span>curr<span class=\"_ _4\"></span>ent tax c<span class=\"_ _4\"></span>redit and c<span class=\"_ _4\"></span>urren<span class=\"_ _4\"></span>t tax receivabl<span class=\"_ _4\"></span>es 5.7<span class=\"_ _25\"></span>.4.1 <span class=\"_ _7f\"> </span>T<span class=\"_ _1\"></span>rade and other receivables<span class=\"_ _1a9\"> </span><table class=\"s w318 h58\" id=\"_b803bed3-43f1-4a5e-b699-6a545be9b69c\"><tr><td class=\"c n xf0 y607 w319 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x121 y607 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x448 y607 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w31a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>rade receivables<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x449 y56a w31b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">316<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44a y56a w31c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">81<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w31d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other receivables<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44b y56b w31e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,696<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44c y56b w31f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,276<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w320 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Prepaid expenses and other current assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44d y5ba w321 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">309<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44e y5ba w322 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">160<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44f y515 w323 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,321<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x450 y515 w324 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">2,517<span class=\"_ _1a9\"> </span></div></td></tr></table>Other receivables r<span class=\"_ _4\"></span>elate mainly to prepayments: 2.376 million euro in 2022,<span class=\"_ _1\"></span> compared to 2.228 million euro in 2021<span class=\"_ _4\"></span>. These ad<span class=\"_ _4\"></span>vances wer<span class=\"_ _4\"></span>e paid upfront to various CRO partners mainly in relation to direct costs and pass-through costs.<span class=\"_ _1a9\"> </span>Allow<span class=\"_ _4\"></span>ance for bad debt is booked on the basis of an estimate of lifetime credit losses at eac<span class=\"_ _4\"></span>h reporting, taking into account the payment histor<span class=\"_ _3\"></span>y of the other par<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>. As per December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> and 2021<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> there are no material aged trade receivab<span class=\"_ _4\"></span>les.<span class=\"_ _1a9\"> </span>The table belo<span class=\"_ _4\"></span>w sho<span class=\"_ _4\"></span>ws the evolution of key trade r<span class=\"_ _4\"></span>eceiv<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>able amounts on the reporting date:<span class=\"_ _1a9\"> </span>IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _8\"> </span><span class=\"wsbe\">2022<span class=\"_ _36\"> </span>2021<span class=\"_ _1a9\"> </span></span>Eumedica<span class=\"_ _15f\"> </span>90<span class=\"_ _16\"> </span>25<span class=\"_ _1a9\"> </span>Inceptua Group<span class=\"_ _131\"> </span>85<span class=\"_ _3f\"> </span>56<span class=\"_ _1a9\"> </span>VIB<span class=\"_ _160\"> </span>119<span class=\"_ _7b\"> </span>0<span class=\"_ _1a9\"> </span>Other trade receivables<span class=\"_ _20\"> </span>22<span class=\"_ _7b\"> </span>0<span class=\"_ _1a9\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _161\"> </span><span class=\"ls41 ws225\">316<span class=\"_ _105\"> </span></span>81<span class=\"_ _1a9\"> </span>Management has sufficient confidence in the creditw<span class=\"_ _4\"></span>orthi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ness of the counterparty that the trade receivable amounts are considered co<span class=\"_ _4\"></span>llectable in full. Aging balance of receivab<span class=\"_ _4\"></span>les that are due<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> but that ar<span class=\"_ _4\"></span>e still considered collectab<span class=\"_ _4\"></span>le based on contractual payment terms:<span class=\"_ _1a9\"> </span><table class=\"s w325 h61\" id=\"_16ca18ee-3aaa-45a6-abe2-9842177a1c5c\"><tr><td class=\"c n xf0 y68a w60 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x451 y68a w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x452 y68a w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y68b w326 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0 - 60 days<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x453 y68b w31b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">316<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x454 y68b w67 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">81<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y68c w327 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">60 - 90 days<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x455 y68c w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x456 y68c w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y68d ff1 fsc fc7 sc0 ls0 ws0\">90 - 120 days<span class=\"_ _1a9\"> </span></td><td class=\"c n x457 y68e w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x458 y68e w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y68f w328 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">more than 120 days<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x459 y68f w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45a y68f w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45b y515 w329 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls41 ws225\">316<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45c y515 w32a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">81<span class=\"_ _1a9\"> </span></div></td></tr></table>When determining the collectability of a trade r<span class=\"_ _4\"></span>eceivable<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the Group takes into account any c<span class=\"_ _4\"></span>hange in the quality of the receivable betw<span class=\"_ _4\"></span>een the date on which the cr<span class=\"_ _4\"></span>edit was granted and the reporting date.<span class=\"_ _1a9\"> </span>The Group has no securities linked to these r<span class=\"_ _4\"></span>eceivables<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.7<span class=\"_ _25\"></span>.4.2 <span class=\"_ _5e\"> </span>T<span class=\"_ _1\"></span>axes<span class=\"_ _1a9\"> </span>Non-current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _1a9\"> </span><table class=\"s w32b h55\" id=\"_169d7040-5c5b-4c96-89d4-013e133d7d7e\"><tr><td class=\"c n xf0 y5fc w60 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45d y5fc w32c h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45e y5fc w1b7 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w32d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax credit<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45f y5ba w32e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3,785<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x460 y5ba w32f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,000<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x461 y515 w330 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,785<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x462 y515 w331 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">4,000<span class=\"_ _1a9\"> </span></div></td></tr></table>Oxurion receives tax credits f<span class=\"_ _4\"></span>or R&amp;D expenses. In case in<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>sufficient tax against which to set off the tax credit,<span class=\"_ _1\"></span> the credit can be carried for<span class=\"_ _3\"></span>ward during five consecutive fiscal y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>. At the end of these five fiscal y<span class=\"_ _4\"></span>ears,<span class=\"_ _1\"></span> the balance of the unused tax credit is r<span class=\"_ _4\"></span>eceived in cash from the government.<span class=\"_ _1a9\"> </span>Current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _1a9\"> </span><table class=\"s w332 h62\" id=\"_dbad26ad-1a41-4f7b-b8d9-6d8a87218443\"><tr><td class=\"c n xf0 y690 w319 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x451 y690 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x463 y690 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y691 w333 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Recoverable V<span class=\"_ _1\"></span>A<span class=\"_ _1\"></span>T<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x464 y691 w334 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">154<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x465 y691 w335 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">24<span class=\"_ _3\"></span>2<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f9 w336 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Recoverable withho<span class=\"_ _4\"></span>lding tax<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x466 y5f9 w337 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x467 y5f9 w338 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y692 w339 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax credit<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x468 y692 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x469 y692 w92 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">568<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w33a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other taxes<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46a y5ba w33b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">33<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46b y5ba w33c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">31<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46c y515 w33d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">189<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46d y515 w33e h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">845<span class=\"_ _1a9\"> </span></div></td></tr></table>The outstanding tax claims r<span class=\"_ _4\"></span>elate to reco<span class=\"_ _4\"></span>verable V<span class=\"_ _25\"></span>A<span class=\"_ _25\"></span>T<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> re<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cover<span class=\"_ _4\"></span>able withholding tax on interest,<span class=\"_ _1\"></span> US corporate income tax and short-term tax credit<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTradeAndOtherReceivablesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-50": {
   "value": "5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _27\"></span>4<span class=\"_ _2f\"></span> <span class=\"_ _159\"> </span><span class=\"ls0 ws0\">T<span class=\"_ _25\"></span>rade and oth<span class=\"_ _4\"></span>er recei<span class=\"_ _4\"></span>vabl<span class=\"_ _4\"></span>es, non-<span class=\"_ _1a9\"> </span></span>curr<span class=\"_ _4\"></span>ent tax c<span class=\"_ _4\"></span>redit and c<span class=\"_ _4\"></span>urren<span class=\"_ _4\"></span>t tax receivabl<span class=\"_ _4\"></span>es 5.7<span class=\"_ _25\"></span>.4.1 <span class=\"_ _7f\"> </span>T<span class=\"_ _1\"></span>rade and other receivables<span class=\"_ _1a9\"> </span><table class=\"s w318 h58\" id=\"_b803bed3-43f1-4a5e-b699-6a545be9b69c\"><tr><td class=\"c n xf0 y607 w319 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x121 y607 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x448 y607 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56a w31a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>rade receivables<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x449 y56a w31b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">316<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44a y56a w31c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">81<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w31d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other receivables<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44b y56b w31e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,696<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44c y56b w31f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,276<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w320 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Prepaid expenses and other current assets<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44d y5ba w321 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">309<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44e y5ba w322 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">160<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x44f y515 w323 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,321<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x450 y515 w324 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">2,517<span class=\"_ _1a9\"> </span></div></td></tr></table>Other receivables r<span class=\"_ _4\"></span>elate mainly to prepayments: 2.376 million euro in 2022,<span class=\"_ _1\"></span> compared to 2.228 million euro in 2021<span class=\"_ _4\"></span>. These ad<span class=\"_ _4\"></span>vances wer<span class=\"_ _4\"></span>e paid upfront to various CRO partners mainly in relation to direct costs and pass-through costs.<span class=\"_ _1a9\"> </span>Allow<span class=\"_ _4\"></span>ance for bad debt is booked on the basis of an estimate of lifetime credit losses at eac<span class=\"_ _4\"></span>h reporting, taking into account the payment histor<span class=\"_ _3\"></span>y of the other par<span class=\"_ _3\"></span>ty<span class=\"_ _25\"></span>. As per December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> and 2021<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> there are no material aged trade receivab<span class=\"_ _4\"></span>les.<span class=\"_ _1a9\"> </span>The table belo<span class=\"_ _4\"></span>w sho<span class=\"_ _4\"></span>ws the evolution of key trade r<span class=\"_ _4\"></span>eceiv<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>able amounts on the reporting date:<span class=\"_ _1a9\"> </span>IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _8\"> </span><span class=\"wsbe\">2022<span class=\"_ _36\"> </span>2021<span class=\"_ _1a9\"> </span></span>Eumedica<span class=\"_ _15f\"> </span>90<span class=\"_ _16\"> </span>25<span class=\"_ _1a9\"> </span>Inceptua Group<span class=\"_ _131\"> </span>85<span class=\"_ _3f\"> </span>56<span class=\"_ _1a9\"> </span>2022<span class=\"_ _1a9\"> </span>VIB<span class=\"_ _160\"> </span>119<span class=\"_ _7b\"> </span>0<span class=\"_ _1a9\"> </span>Other trade receivables<span class=\"_ _20\"> </span>22<span class=\"_ _7b\"> </span>0<span class=\"_ _1a9\"> </span>T<span class=\"_ _1\"></span>otal<span class=\"_ _161\"> </span><span class=\"ls41 ws225\">316<span class=\"_ _105\"> </span></span>81<span class=\"_ _1a9\"> </span>Management has sufficient confidence in the creditw<span class=\"_ _4\"></span>orthi<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ness of the counterparty that the trade receivable amounts are considered co<span class=\"_ _4\"></span>llectable in full. Aging balance of receivab<span class=\"_ _4\"></span>les that are due<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> but that ar<span class=\"_ _4\"></span>e still considered collectab<span class=\"_ _4\"></span>le based on contractual payment terms:<span class=\"_ _1a9\"> </span><table class=\"s w325 h61\" id=\"_16ca18ee-3aaa-45a6-abe2-9842177a1c5c\"><tr><td class=\"c n xf0 y68a w60 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x451 y68a w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x452 y68a w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y68b w326 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0 - 60 days<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x453 y68b w31b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">316<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x454 y68b w67 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">81<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y68c w327 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">60 - 90 days<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x455 y68c w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x456 y68c w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h13 y68d ff1 fsc fc7 sc0 ls0 ws0\">90 - 120 days<span class=\"_ _1a9\"> </span></td><td class=\"c n x457 y68e w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x458 y68e w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y68f w328 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">more than 120 days<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x459 y68f w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45a y68f w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45b y515 w329 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls41 ws225\">316<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45c y515 w32a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">81<span class=\"_ _1a9\"> </span></div></td></tr></table>When determining the collectability of a trade r<span class=\"_ _4\"></span>eceivable<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> the Group takes into account any c<span class=\"_ _4\"></span>hange in the quality of the receivable betw<span class=\"_ _4\"></span>een the date on which the cr<span class=\"_ _4\"></span>edit was granted and the reporting date.<span class=\"_ _1a9\"> </span>The Group has no securities linked to these r<span class=\"_ _4\"></span>eceivables<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>5.7<span class=\"_ _25\"></span>.4.2 <span class=\"_ _5e\"> </span>T<span class=\"_ _1\"></span>axes<span class=\"_ _1a9\"> </span>Non-current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _1a9\"> </span><table class=\"s w32b h55\" id=\"_169d7040-5c5b-4c96-89d4-013e133d7d7e\"><tr><td class=\"c n xf0 y5fc w60 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45d y5fc w32c h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45e y5fc w1b7 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w32d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax credit<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45f y5ba w32e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3,785<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x460 y5ba w32f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,000<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x461 y515 w330 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,785<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x462 y515 w331 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">4,000<span class=\"_ _1a9\"> </span></div></td></tr></table>Oxurion receives tax credits f<span class=\"_ _4\"></span>or R&amp;D expenses. In case in<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>sufficient tax against which to set off the tax credit,<span class=\"_ _1\"></span> the credit can be carried for<span class=\"_ _3\"></span>ward during five consecutive fiscal y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>. At the end of these five fiscal y<span class=\"_ _4\"></span>ears,<span class=\"_ _1\"></span> the balance of the unused tax credit is r<span class=\"_ _4\"></span>eceived in cash from the government.<span class=\"_ _1a9\"> </span>Current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _1a9\"> </span><table class=\"s w332 h62\" id=\"_dbad26ad-1a41-4f7b-b8d9-6d8a87218443\"><tr><td class=\"c n xf0 y690 w319 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x451 y690 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x463 y690 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y691 w333 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Recoverable V<span class=\"_ _1\"></span>A<span class=\"_ _1\"></span>T<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x464 y691 w334 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">154<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x465 y691 w335 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">24<span class=\"_ _3\"></span>2<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f9 w336 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Recoverable withho<span class=\"_ _4\"></span>lding tax<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x466 y5f9 w337 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x467 y5f9 w338 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y692 w339 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax credit<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x468 y692 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x469 y692 w92 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">568<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w33a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other taxes<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46a y5ba w33b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">33<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46b y5ba w33c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">31<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46c y515 w33d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">189<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46d y515 w33e h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">845<span class=\"_ _1a9\"> </span></div></td></tr></table>The outstanding tax claims r<span class=\"_ _4\"></span>elate to reco<span class=\"_ _4\"></span>verable V<span class=\"_ _25\"></span>A<span class=\"_ _25\"></span>T<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> re<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cover<span class=\"_ _4\"></span>able withholding tax on interest,<span class=\"_ _1\"></span> US corporate income tax and short-term tax credit<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherCurrentAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-78": {
   "value": "Allowance for bad debt is booked on the basis of an estimate of lifetime credit losses at each reporting, taking into account the payment history of the other party. As per December 31, 2022, and 2021, there are no material aged trade receivables",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAllowanceForCreditLossesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-106": {
   "value": "<div class=\"t m1 h17 ff8 fs9 fc7 sc0 ls0 ws0 gs1a6\">5.7<span class=\"_ _25\"></span>.4.2 <span class=\"_ _5e\"> </span>T<span class=\"_ _1\"></span>axes<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs1a7\">Non-current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _1a9\"> </span></div><div class=\"gs1a8\"><table class=\"s w32b h55\" id=\"_169d7040-5c5b-4c96-89d4-013e133d7d7e\"><tr><td class=\"c n xf0 y5fc w60 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45d y5fc w32c h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45e y5fc w1b7 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w32d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax credit<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x45f y5ba w32e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3,785<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x460 y5ba w32f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4,000<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x461 y515 w330 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,785<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x462 y515 w331 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">4,000<span class=\"_ _1a9\"> </span></div></td></tr></table></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws68 gs1a9\">Oxurion receives tax credits f<span class=\"_ _4\"></span>or R&amp;D expenses. In case in<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws123 gs1aa\">sufficient tax against which to set off the tax credit,<span class=\"_ _1\"></span> the credit </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws7d gs1ab\">can be carried for<span class=\"_ _3\"></span>ward during five consecutive fiscal y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>. </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws29 gs1ac\">At the end of these five fiscal y<span class=\"_ _4\"></span>ears,<span class=\"_ _1\"></span> the balance of the </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsc5 gs1ad\">unused tax credit is r<span class=\"_ _4\"></span>eceived in cash from the government.<span class=\"_ _1a9\"> </span></div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs1ae\">Current tax r<span class=\"_ _4\"></span>eceivables<span class=\"_ _1a9\"> </span></div><div class=\"gs1af\"><table class=\"s w332 h62\" id=\"_dbad26ad-1a41-4f7b-b8d9-6d8a87218443\"><tr><td class=\"c n xf0 y690 w319 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 DECEMBER)<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x451 y690 w6f h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x463 y690 w70 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y691 w333 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Recoverable V<span class=\"_ _1\"></span>A<span class=\"_ _1\"></span>T<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x464 y691 w334 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">154<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x465 y691 w335 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">24<span class=\"_ _3\"></span>2<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5f9 w336 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Recoverable withho<span class=\"_ _4\"></span>lding tax<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x466 y5f9 w337 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x467 y5f9 w338 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">4<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y692 w339 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ax credit<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x468 y692 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x469 y692 w92 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">568<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w33a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other taxes<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46a y5ba w33b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">33<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46b y5ba w33c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls50 ws254\">31<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w251 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46c y515 w33d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">189<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x46d y515 w33e h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">845<span class=\"_ _1a9\"> </span></div></td></tr></table></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws6d gs1b0\">The outstanding tax claims r<span class=\"_ _4\"></span>elate to reco<span class=\"_ _4\"></span>verable V<span class=\"_ _25\"></span>A<span class=\"_ _25\"></span>T<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> re<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1ee gs1b1\">cover<span class=\"_ _4\"></span>able withholding tax on interest,<span class=\"_ _1\"></span> US corporate income </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs1b2\">tax and short-term tax credit<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span></div>5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _5\"></span>1<span class=\"_ _27\"></span>0<span class=\"_ _2f\"> </span> <span class=\"_ _189\"> </span><span class=\"ls18 ws95\">Other sh<span class=\"_ _3\"></span>or<span class=\"_ _3\"></span>t<span class=\"_ _4\"></span>-<span class=\"_ _1\"></span>term liabilities<span class=\"_ _1a9\"> </span></span><table class=\"s w433 h73\" id=\"_ab84c568-c59f-420f-be64-deb4a11db001\"><tr><td class=\"t m1 x12d h12 y79e ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO (AS A<span class=\"_ _1\"></span>T 31 </td><td class=\"c n x5e5 y79f w61 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e6 y79f w62 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m1 x12d h12 y7a0 ff3 fsb fc7 sc0 ls1b wsbe\">DECEMBER)<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y7a1 w20e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ee benefits<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e7 y7a1 w434 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">548<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e8 y7a1 w435 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,684<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y7a2 w436 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Other current liabilities<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5e9 y7a2 w28e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,813<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ea y7a2 w257 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">628<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h1d y7a3 ff2 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal other shor<span class=\"_ _3\"></span>t-term </td><td class=\"c n x5eb y61b w437 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,361<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x5ec y61b w438 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2,3<span class=\"_ _4\"></span>12<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x12d h1d y7a4 ff2 fsc fc7 sc0 ls0 ws0\">liabilities<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr></table>Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s Defined Benefit Obligation (<span class=\"ff3 ws0\">\u201cDBO\u201d</span>) is a non-cur<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>rent liability<span class=\"_ _25\"></span>. Emplo<span class=\"_ _4\"></span>yee benefits include ho<span class=\"_ _4\"></span>liday pay<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> bonus,<span class=\"_ _1\"></span> and out<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>standing emplo<span class=\"_ _4\"></span>yee taxes<span class=\"_ _4\"></span>. The other curr<span class=\"_ _4\"></span>ent liabilities consist of commitments that expire befor<span class=\"_ _4\"></span>e year<span class=\"_ _1\"></span>-end<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> but for which an invoice w<span class=\"_ _4\"></span>as not yet r<span class=\"_ _4\"></span>eceived<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTaxReceivablesAndPayablesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-120": {
   "value": "5.7.5  Inventories N '000 EURO (AS AT 31 DECEMBER) 2022 2021 Raw and ancillary materials, goods in process and 5 60 finished goods Total 5 60 The inventories of raw and ancillary materials, goods in process and finished goods are based on the net value, after impairment losses. The impairment losses on the inventories recognized in cost of goods amount to 0.444 million euro in 2022, compared to 0.629 million euro in 2021 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInventoriesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-131": {
   "value": "5.7.6   Investments IN '000 EURO (AS AT 31 DECEMBER) 2022 2021 Other investments 95 247 Total investments 95 247 FINANCE ASSETS ACCORDING TO CATEGORIES INVESTMENTS AT INVESTMENTS DEFINED IN IFRS 9 AMORTIZED COST AT FVOCI Balance at 1 January 2021 0 288 Exchange rate differences 0 7 Additions 0 0 Retirements 0 -40 Impairments 0 -1 Appreciation at market value 0 -7 Balance at 31 December 2021 0 247 -/- of which taken in fixed assets - - Taken in current assets 0 247 Composition - Other bonds 0 247 - Term investments 0 0 Breakdown per currency - in euro 0 140 - in other currency 0 107 Total 0 247 Balance at 1 January 2022 0 247 Exchange rate differences 0 9 Additions 0 0 Retirements 0 -152 Impairments 0 -4 Appreciation at market value 0 -5 Balance at 31 December 2022 0 95 -/- of which taken in fixed assets - - Taken in current assets 0 95 Composition - Other bonds 0 95 - Term investments 0 0 Breakdown per currency - in euro 0 95 - in other currency 0 0 Total 0 95 The Group decided to invest mainly in saving accounts and term deposits. The remaining bonds are held by KBC and are distributed in two bonds of private and public insti- tutions. The credit rating varies from A+ to BBB. Bonds are measured at fair value at level 1 hierarchy based on quoted market prices 5.7.11  Convertible loans The convertible loans include the following: IN '000 EURO KREOS / NEGMA TOTAL PONTIFAX 31 December 2020 0 0 0 Proceeds from loans and borrowings 10,000 2,50012,500 Commitment fee 0 525 525 Converted into capital 0 -1,350-1,350 Fair value adjustment 25 134 159 31 December 2021 10,025 1,80911,834 Proceeds from loans and borrowings 0 7,150 7,150 Commitment fee 0 700 700 Converted into capital 0 -9,025-9,025 Repayment of loans and borro- wings -3,605 0-3,605 Fair value adjustment -436 426 -10 31 December 2022 5,984 1,060 7,044 Of which current 2,749 1,060 3,809 Of which non-current 3,235 0 3,235 The Company issued convertible bonds since 2021 with two parties as described below: Negma Group Ltd. On August 26, 2021, Oxurion (the Company or the Issuer) entered into an agreement whereby Negma as investor is willing to subscribe to, up to 12,000 zero coupon au- tomatically convertible bonds with each a nominal value  of 2,500 euro, in several tranches of minimum 200 and  bonds\u201d) through several Tranches (\u201cPart B Commitment\u201d),  maximum 1,000 bonds for a total committed amount up  to be called by the Issuer at its discretion over the period  to 30 million euro. The Company as issuer controls the  between September 2, 2022 up to December 31, 2022  timing and amount of the tranche calls. (\u201cPart B Commitment Period\u201d). The Investor is entitled to a commitment fee for an  The initial terms and conditions as set forth in the Issuance  amount equal to up to 3.5% of the total commitment, i.e., and Subscription Agreement remain unchanged for Part  up to 1.050 million euro, payable, at the option of the Issuer, A of the Funding Program. Part A of the Funding Program  either in cash or in commitment fee convertible bonds.  was suspended during the Part B Commitment Period.  50% of the commitment fee is due upon signing of the  Upon expiry of the Part B Commitment Period, Part A  agreement, the remaining 50% is due only if a tranche call  of the Funding Program was automatically reactivated  is exercised by the Issuer, as a result of which in total half of  (including that part of the Part B Commitment for which  the commitment will have been called by the Issuer. no Part B Convertible bonds shall have been issued and  subscribed to during the Part B Commitment Period). The conversion price is 92% of the lowest closing vol- ume-weighted average price (VWAP) over a period of  For the Part B Commitment, the Investor is entitled to a  15 consecutive trading days expiring on the trading day  further waiver and commitment fee equal to 0,7 million  immediately preceding the date of issuance of a con- euro, payable in 280 convertible bonds for the Part B  version notice. Each convertible bond and commitment  Commitment together with the first tranche of the Part B  fee convertible bond has a duration of twelve months as  Commitment .The waiver and commitment fee convert- from its date of issuance and shall accrue no interest. Any  ible bonds have a nominal value of 0,0025 million euro  convertible bond and commitment fee convertible bond  each. not converted into shares prior to the maturity date, shall  convert automatically into shares at maturity date. The  The conversion price of the Part B convertible bonds is  Investor has the right to convert all or any of the convert- 80% of the lowest closing volume-weighted average  ible bonds and commitment fee convertible bonds into  price (VWAP) over a period of 15 consecutive trading  new shares at any time.  days expiring on the trading day immediately preceding  the date of issuance of a conversion notice.  There is no  The number of shares to be issued upon conversion shall  liquidity condition or cool down period. be equal to the conversion amount divided by the appli- cable conversion price, provided that it shall not exceed  The number of shares to be issued upon conversion shall  a maximum of 38,291,950 shares. If the Investor does  be equal to the conversion amount divided by the appli- not receive the relevant shares, the Issuer shall pay to the  cable conversion price. The cap of 38,291,950 shares is  Investor an amount in cash (\u201cPart A of Funding Program\u201d) deleted from the terms and conditions of the agreement.  On September 2, 2022, the parties amended the terms  The convertible bonds described above meets the defini- and conditions of part of the funding program (\u201cPart B\u201d)  tion of a financial liability given that the conversion price  for an amount of up to 6 million euro of the total com- is not fixed and upon conversion, will result in a variable  mitment through the issuance and subscription of up  number of shares being issued, being the nominal amount  to 2.400 of the convertible bonds (\u201cPart B Convertible  of the convertible loan divided by the conversion price. The  convertible bond is also a derivative financial liability as the conversion feature is an embedded derivative of the loan host. The host and the derivative will not be separated and are accounted for as one hybrid financial liability. The financial liability is measured at fair value through profit or loss. The initial fair value of the convertible loan equals an amount of cash received in the amount of  9.650 million euro of which 2.5 million euro was received in 2021 and 7.150 million euro was received in 2022 (5 million euro Part A and 4.650 million euro Part B). A total of 1.350 million euro was already converted into shares before December 31, 2021. During 2022 another 9.025 million euro has been converted into shares before December 31, 2022, following the conversion of (in aggregate) 3.610 convertible bonds that were issued. Subsequently, the fair value of the convertible loan related to the Part A convertible bonds as per December 31, 2021, is determined as the nominal amount of the convertible loan plus 8%. The 8% represents the difference between the share price and the 92% of the lowest closing VWAP. Given the volatility of the share prices as per year ending December 31, 2022, the fair value of the convertible loan related to the Part B Convertible bonds is based on the intrinsic value approach. Considering the term of the convertible loan to be less than twelve months, no option pricing model is used. The outstanding convertible loan has a nominal value of 0.5 million euro as per 31 December 2022 and the fair value is determined at 1.06 million euro with changes in the fair value recorded in profit and loss as fair value gains and losses on the convertible loan. The fair value loss in the amount of 0.426 million euro as per December 31, 2022, is included in the line item \u2018Finance expense\u2019 in the consolidated statement of profit and loss. The fair value of the converted bonds during 2022 was 16.423 million euro. The difference between the fair value and the nominal amount was recorded in profit and loss as fair value loss included in the line finance expense for an amount of 7.824 million euro and 0.426 million euro in other reserves upon conversion. Upon conversion, the financial liability measured at fair value at date of conversion will be reclassified to share- holders\u2019 equity. The liability for the first instalment of the Part A commit- ment fee of 0.525 million euro (50% upon signing of the agreement) is made once the first Tranche Call is called by the Company. The commitment fee is recorded in profit and loss as transaction cost due, given the Company cannot avoid cash settlement if the Investor requests eventual payment in cash. These transaction costs are included in the line item \u2018Finance expense\u2019 in the consoli- dated statement of profit and loss. The second instalment of the Part A commitment fee of 0.525 million euro is recognized if and only if a tranche call is exercised by the Issuer, as a result of which in total more than half of the total commitment will have been called. This commitment fee is considered as a transaction cost in accordance with IFRS 9 and expensed as incurred as financial expense, given it is an incremental cost that the Company would not incur if the triggering condition is not met. This second instalment has not been accounted for as per December 31, 2022, since there is no present obligation yet. The Part B waiver and commitment fee of 0.7 million euro payable in 280 convertible bonds with a nominal value of 0.0025 million euro became due upon the payment of the first tranche under Part B pursuant to the addendum and is recorded as financial expense in the consolidated statement of profit and loss given these are considered as transactions costs. The corresponding liability is measured  2.  The conversion price may be adjusted from time to  at fair value through profit and loss. Upon conversion the  time upon the occurrence of corporate actions, such  financial liability measured at fair value at the date of con- as merger, demerger, stock splits or reverse stock split, version, will be reclassified to shareholders equity.  in accordance with the adjustment policy set out in the  Euronext Corporate Action Policy Kreos Capital / Pontifax Ventures 3.  In the event that, between the issue date of the Kreos  Bonds and the date falling twelve months after the  On November 21, 2021, Oxurion (the Company or the  Loan Facility (i.e. 22 November 2022, the Company  Issuer) entered into the Loan Facility whereby Kreos  issued any shares in the context of an equity financing  Capital VI Limited together with Pontifax Medison  at an issue price per share which represents a  Finance L.P. (the Investors) as investors are willing to  discount of more than 20% to the VWAP (volume- subscribe to convertible bonds with each a nominal value  weighted average price) over the thirty trading days  of 0.1 million euro, in an amount of 10.0 million euro.  period preceding the date of such issuance of shares, The Investors are entitled to a transaction fee of 0.125  the Kreos Conversion Price shall be adjusted to 140%  million euro and an end of loan payment equal to 3.5%  of the average issue price of all shares issued by the  that shall accrue on the amount drawn under each tranche.  Company in the context of any equity financing since  The convertible bonds accrue interest in the amount of  the issue date of the Kreos Bonds (if lower than the  7.95% per year.  Kreos Conversion Price). As a result, the strike price  was reset at 0.28 euro per share. The convertible bonds may be either: On June 21, 2022, the Company, Kreos Capital VI  1.  Converted in shares at the option of the Investors at  Limited and Pontifax Medison Finance L.P. executed an  any time. amendment to the convertible bond facility, pursuant  2.  Converted in shares at the option of the Issuer when  to which a repayment of 3.0 million euro (30%) of the  certain conditions are met. principal amount (excluding capitalized interest) of the  3.  Repaid based on the amortization schedule without  first tranche of 10.0 million euro was made. As part of the  extension. amendment, it was agreed that the cash covenant would  4.  Repaid based on the amortization schedule with  be reduced from 4.0 million euro to 3.0 million euro, the  extension. repayment schedule was revised and the interest only  5.  Prepaid when certain conditions are met. period was extended to September 30, 2022. At the same  6.  Paid in full in case of events of default or change in  time, Kreos/Pontifax agreed not exercise any rights they  control. might have had to recover amounts owed to them under  the Loan Agreement provided that certain conditions are  The number of shares to be issued upon conversion shall  met, the fulfilment of which is uncertain. be equal to the conversion amount divided by the applica- ble conversion price: The convertible bond described above meets the definition  of a financial liability given that the Company cannot avoid  1.  The initial conversion price of the Bonds was equal to  delivering cash to the investors and the conversion price  2.90 euro. is not fixed. The Company cannot avoid delivering cash as  they do not have control over the different scenarios. The  conversion price can also change upon certain scenario\u2019s  as described above and as such the number of shares being issued will vary based on the conversion price. The convertible bond is also a derivative financial liability as the conversion feature is an embedded derivative of the loan host. The host and the derivative will not be separated. The financial liability is measured at fair value through profit or loss. In determining the fair value, the company makes certain judgements on the valuation model to be applied and the probability that certain scenarios will occur or not in the future. The fair value of the convertible bonds has been measured considering the following scenarios that may impact the term of the bond: 1.  No extension 2.  With extension 3.  Prepaid when certain conditions are met. 4.  Paid in full in case of events of default or change in control. The initial fair value of the convertible loan equals the amount of cash received which is 10.0 million euro as per December 31, 2021. Subsequently the fair value is de- termined as the probability weighted average of the fair values of the different scenarios described above consid- ering the pre-payment agreed on June 21, 2022. The fair value of the scenarios has been determined by application of the effective interest rate method and the Black-Scholes model. The payment by the Company to Pontifax Medison Finance L.P is paid in USD by converting the relevant due amount in euro into the USD at a fixed exchange rate. For Pontifax, the fair value of the convertible loan is deter- mined based on the application of the effective interest rate method considering the USD loan payment at the spot rate at valuation date. The above fair value measurement is a level 3 as a result of the unobservable input for the probabilities. A reason- able change of the probabilities between the different sce- nario\u2019s would not lead to a material change in the fair value. The fair value as per December 31, 2022, is determined at 5.984 million euro, taking into account the repayment of 3 million euro, with changes in the fair value recorded in profit and loss as fair value gains and losses on the con- vertible loan. The fair value gain in the amount of 0.436 million euro as per December 31, 2022, are included in the line item \u2018Finance income\u2019 in the consolidated statement of profit and loss. No amounts have already been converted into shares as per December 31, 2022. Upon conversion, the financial liability measured at fair value at date of conversion will be reclassified to share- holders\u2019 equity, being share capital and share premium and other reserves for the fair value adjustment portion. The Loan Facility is subject to a financial covenant whereby the Group is required to maintain at all times a minimum aggregate amount of cash in the bank of an amount equal to the lower of 3 million euro and the principal amount outstanding. The Group has complied with the financial covenant at December 31, 202 2 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDebtSecuritiesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-93": {
   "value": "5.7.7  Share capital Oxurion was incorporated on May 30, 2006, under its former name \u2018ThromboGenics\u2019, with a share capital of 62,000 euro represented by 11,124 shares. On December 31, 2022, the share capital of the Company on a consolidated basis amounted to 65.4 million euro represented by 411,071,559 ordinary shares without indication of nominal value. All shares are fully paid up and have the same rights. NUMBER OF SHARES  31 December 2020 38,291,950 Capital increase due to conversion of convertible bonds 775,334 31 December 2021 39,067,284 Capital increase by contribution in cash 7,226,039 Capital increase due to conversion of convertible bonds 364,778,236 31 December 2022 411,071,559 IN '000 EURO CAPITAL SHARE PREMIUM 31 December 2020 44,913 0 Capital increase due to conversion of convertible bonds 1,116 234 31 December 2021 46,029 234 Capital increase by contribution in cash 10,405 0 Capital increase due to conversion of convertible bonds 9,009 16 31 December 2022 65,443 250 The Board of Directors\u2019 powers with respect to the author- ized share capital were renewed at the EGM of Oxurion held on May 24, 2022, for a period of five years starting from the publication of the notary deed pertaining to t he modification of the Articles of Association in the Belgian Official Gazette (May 24, 2022). The Board of Directors is authorized to increase the share capital of the Company upon one or more occasions up to an amount of 67,931,161.32 euro (less the authorized capital which is used in view of the issuance of convertible bonds) through contribution(s) in cash, contribution(s) in kind, or by con- version of the reserves in accordance with the special report drawn up pursuant to Article 7:199 of the BCCA. As a result, on December 31, 2022, the authorized capital is 65,443,000 euro. During financial year 2022, Oxurion\u2019s share capital and share premium has been increased on several occasions following the conversion of (in aggregate) 3,610 converti- ble bonds issued to Negma: DAT E BONDS CAPITAL SHARE PREMIUM  (IN EURO) (IN EURO) 8 February 2022 200 483,219.36 16,780.64 23 March 2022 240 600,000.00 0.00 15 April 2022 230 575,000.00 0.00 18 May 2022 200 500,000.00 0.00 7 June 2022 180 450,000.00 0.00 6 July 2022 220 550,000.00 0.00 17 August 2022 200 500,000.00 0.00 5 September 2022 80 200,000.00 0.00 13 September 2022 80 200,000.00 0.00 12 October 2022 173 432,500.00 0.00 19 October 2022 164 410,000.00 0.00 24 October 2022 120 300,000.00 0.00 26 October 2022 123 307,500.00 0.00 2 November 2022 120 300,000.00 0.00 7 November 2022 130 325,000.00 0.00 17 November 2022 56 140,000.00 0.00 22 November 2022 172 430,000.00 0.00 24 November 2022 140 350,000.00 0.00 28 November 2022 242 605,000.00 0.00 30 November 2022 80 200,000.00 0.00 5 December 2022 80 200,000.00 0.00 9 December 2022 380 950,000.00 0.00 Total 3,610 9,008,219.36 16,780.64 In addition to the Negma funding, a capital increase also took place in the context of the authorized capital by a contribution in cash of 10,405,500 euro and with the issuance of 7,226,039 new Oxurion NV shares at 1.44 euro per share through a private equity placement on March 7, 2022 . ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIssuedCapitalExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-24": {
   "value": "5.7<span class=\"_ _25\"></span>.7 <span class=\"_ _58\"> </span><span class=\"ls10 ws14\">S<span class=\"_ _3\"></span>hare c<span class=\"_ _3\"></span>apital<span class=\"_ _1a9\"> </span></span>Oxurion was incorpor<span class=\"_ _4\"></span>ated on May 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2006<span class=\"_ _25\"></span>, under its former name \u2018ThromboGenics<span class=\"_ _1\"></span>\u2019,<span class=\"_ _4\"></span> with a share capital of 62,000 euro repr<span class=\"_ _4\"></span>esented by 11<span class=\"_ _1\"></span>,124 shares<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> the shar<span class=\"_ _4\"></span>e capital of the Company on a consolidated basis amounted to 65<span class=\"_ _1\"></span>.4 million euro represented b<span class=\"_ _4\"></span>y 4<span class=\"_ _1\"></span>11,071<span class=\"_ _1\"></span>,559 ordinar<span class=\"_ _3\"></span>y shares without indication of nominal value. All shar<span class=\"_ _4\"></span>es are fully paid up and have the same rights<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span><table class=\"s w36d h53\" id=\"_c4698786-cf45-4ed2-9ae4-fd6f1115c572\"><tr><td class=\"t m1 x34d h12 y6be ff3 fsb fc7 sc0 ls1b ws0\">NUMBER OF SHARES<span class=\"_ _16e\"> </span><span class=\"ls0\"> </span></td><td></td></tr><tr><td class=\"c n xf0 y6bf w364 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2020<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b3 y6bf w36e h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">38<span class=\"_ _4\"></span>,291<span class=\"_ _4\"></span>,950<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y569 w36f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Capital increase due to conversion of convertible bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b4 y569 w370 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _3\"></span>75<span class=\"_ _4\"></span>,334<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6c0 w367 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b5 y6c0 w371 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">39<span class=\"_ _1\"></span>,067<span class=\"_ _1\"></span>,284<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y56b w368 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Capital increase by contribution in cash<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b6 y56b w372 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,226<span class=\"_ _1\"></span>,039<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y5ba w36f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Capital increase due to conversion of convertible bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b7 y5ba w373 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">364,778,236<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w36c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b8 y515 w374 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">411<span class=\"_ _4\"></span>,071<span class=\"_ _4\"></span>,559<span class=\"_ _1a9\"> </span></div></td></tr></table><table class=\"s w361 h65\" id=\"_a2f978a2-d1d3-4a5f-9c6e-6a3f1e6e6139\"><tr><td class=\"c n xf0 y6b4 w362 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a6 y6b4 w363 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">CAPIT<span class=\"_ _1\"></span>AL<span class=\"_ _1a9\"> </span></div></td><td class=\"t m1 x3ef h12 y6b5 ff3 fsb fc7 sc0 ls1b wsbe\">SHARE<span class=\"ls0 ws0\"> </span></td></tr><tr><td></td><td></td><td class=\"t m1 x4a7 h12 y6b6 ff3 fsb fc7 sc0 ls1b wsbe\">PREMIUM<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y6b7 w364 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2020<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a8 y6b7 w169 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">44,913<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4a9 y6b7 w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c xf0 y6b8 w365 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Capital increase due to conversion of<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">convertible bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4aa y5f7 w17f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,116<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ab y5f7 w366 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">234<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6b9 w367 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ac y6b9 w18f h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">46<span class=\"_ _4\"></span>,029<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ad y6b9 w188 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">234<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6ba w368 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Capital increase by contribution in cash<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ae y6ba w369 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">10<span class=\"_ _4\"></span>,405<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x467 y6ba w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c xf0 y6bc w36a h66\"><div class=\"t m0 xca h28 y6bb ff1 fsd fc7 sc0 ls0 ws0\">Capital increase due to conversion of<span class=\"_ _1a9\"> </span></div><div class=\"t m0 xca h28 y51f ff1 fsd fc7 sc0 ls0 ws0\">convertible bonds<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4af y6bd w36b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">9<span class=\"_ _4\"></span>,009<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b0 y6bd w19f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">16<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w36c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b1 y515 w1ae h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">65<span class=\"_ _4\"></span>,443<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4b2 y515 w1af h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">250<span class=\"_ _1a9\"> </span></div></td></tr></table>The Board of Dir<span class=\"_ _4\"></span>ectors<span class=\"_ _4\"></span>\u2019 po<span class=\"_ _4\"></span>wers with r<span class=\"_ _4\"></span>espect to the author<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ized share capital w<span class=\"_ _4\"></span>ere renew<span class=\"_ _4\"></span>ed at the EGM of Oxurion held on May 2<span class=\"_ _4\"></span>4<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _1\"></span> for a period of five years starting from the publication of the notary deed per<span class=\"_ _3\"></span>taining to<span class=\"_ _1a9\"> </span>he modification of the Articles of Association in the Belgian Official Gazette (May 2<span class=\"_ _4\"></span>4<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022). T<span class=\"_ _4\"></span>he Board of Directors is authorized to incr<span class=\"_ _4\"></span>ease the share capital of the Company upon one or mor<span class=\"_ _4\"></span>e occasions up to an amount of 67<span class=\"_ _25\"></span>,93<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,161<span class=\"_ _1\"></span>.32 euro (less the authorized capital which is used in view of the issuance of convertible bonds) through contribution(s) in cash,<span class=\"_ _1\"></span> contribution(s) in kind<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> or b<span class=\"_ _4\"></span>y con<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>version of the reserves in accordance with the special report drawn up pursuant to Article 7:199 of the BCCA. As a result,<span class=\"_ _1\"></span> on December 31<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022, the authorized capital is 65<span class=\"_ _1\"></span>,443<span class=\"_ _4\"></span>,000 euro<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>During financial year 2022,<span class=\"_ _1\"></span> Oxurion\u2019<span class=\"_ _1\"></span>s share capital and share premium has been incr<span class=\"_ _4\"></span>eased on several occasions follo<span class=\"_ _4\"></span>wing the conversion of (in aggregate) 3<span class=\"_ _1\"></span>,610 conver<span class=\"_ _3\"></span>ti<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ble bonds issued to Negma: <table class=\"s w375 h67\" id=\"_0aa36e6d-4502-4a0e-9419-9fd9cc06a4b9\"><tr><td class=\"c n xcb y6c1 w376 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls32 ws1f7\">D<span class=\"_ _3\"></span>AT<span class=\"_ _5\"> </span>E<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ba y6c1 w377 h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">BONDS<span class=\"_ _1a9\"> </span></div></td><td class=\"t m1 x4bb h12 y6c2 ff3 fsb fc7 sc0 ls1b wsbe\">CAPIT<span class=\"_ _1\"></span>AL<span class=\"ls0 ws0\"> </span></td><td class=\"t m1 x4bc h12 y6c2 ff3 fsb fc7 sc0 ls1b ws0\">SHARE PREMIUM </td></tr><tr><td></td><td></td><td class=\"t m1 x4bb h12 y6c3 ff3 fsb fc7 sc0 ls1b ws0\"> (IN EURO)<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x4bc h12 y6c3 ff3 fsb fc7 sc0 ls1b ws0\">(IN EURO)<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xd1 y6c4 w1c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">8 F<span class=\"_ _4\"></span>ebruary 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4bd y6c4 w2c6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">200<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4be y6c4 w378 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">483,219<span class=\"_ _1\"></span>.36<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4bf y6c4 w379 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">16<span class=\"_ _1\"></span>,780<span class=\"_ _4\"></span>.64<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4c0 y6c5 w20 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">23 March 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c1 y6c5 w21 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">240<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c2 y6c5 w37a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">600<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c3 y6c5 w51 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4c4 y6c6 w24 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">15 April 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c5 y6c6 w37b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">230<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c6 y6c6 w37c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">575,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c7 y6c6 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4c4 y6c7 w27 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">18 May 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c8 y6c7 w2c7 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">200<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4c9 y6c7 w31 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">500<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ca y6c7 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xe1 y6c8 w29 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _4\"></span> June 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4cb y6c8 w37e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">180<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4cc y6c8 w37f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">450<span class=\"_ _4\"></span>,000<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4cd y6c8 w2c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xe5 y6c9 w2d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">6 July 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ce y6c9 w380 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">220<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4cf y6c9 w381 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">550<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d0 y6c9 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4c0 y6ca w30 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">17<span class=\"_ _4\"></span> August 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d1 y6ca w2c6 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">200<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d2 y6ca w382 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">500<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d3 y6ca w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4d4 y6cb w33 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">5 September 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d5 y6cb w383 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">80<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d6 y6cb w384 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">200<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d7 y6cb w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6cc w36 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">13 September 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d5 y6cc w383 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">80<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d6 y6cc w384 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">200<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d7 y6cc w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xd1 y6cd w385 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">12 October 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d8 y6cd w386 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">173<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4d9 y6cd w387 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">432,500<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4da y6cd w23 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xd1 y6ce w3a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">19 October 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4db y6ce w3b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">164<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4dc y6ce w388 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">410<span class=\"_ _1\"></span>,000.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4dd y6ce w389 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xfa y6cf w38a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">24 October 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4de y6cf w35a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">120<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4df y6cf w3f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">300<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e0 y6cf w2c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xfa y6d0 w38b h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">26 October 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e1 y6d0 w181 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">123<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e2 y6d0 w38c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">307<span class=\"_ _25\"></span>,500.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e3 y6d0 w45 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4e4 y6d1 w38d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2 November 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e5 y6d1 w35a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">120<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e6 y6d1 w38e h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">300<span class=\"_ _4\"></span>,000<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e7 y6d1 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4e8 y6d2 w46 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _4\"></span> November 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4e9 y6d2 w38f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">130<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ea y6d2 w390 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">325<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4eb y6d2 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4d4 y6d3 w49 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">17<span class=\"_ _4\"></span> November 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ec y6d3 w4a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">56<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ed y6d3 w391 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">140<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ee y6d3 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6d4 w4c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">22 November 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ef y6d4 w392 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">172<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f0 y6d4 w393 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">430<span class=\"_ _4\"></span>,000<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f1 y6d4 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y65e w4f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">24 No<span class=\"_ _4\"></span>vember 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f2 y65e w35a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">140<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f3 y65e w394 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">350<span class=\"_ _1\"></span>,000<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f4 y65e w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6d5 w395 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">28 November 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f5 y6d5 w335 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls1c wsbf\">24<span class=\"_ _3\"></span>2<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f6 y6d5 w396 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">605<span class=\"_ _4\"></span>,000<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f7 y6d5 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6d6 w55 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">30 November 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f8 y6d6 w383 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">80<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4f9 y6d6 w397 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">200,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4fa y6d6 w23 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4e4 y6d7 w398 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">5 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4fb y6d7 w383 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">80<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4fc y6d7 w35 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">200<span class=\"_ _4\"></span>,000<span class=\"_ _1\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4fd y6d7 w23 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n x4e4 y6d8 w59 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">9 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4fe y6d8 w5a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">380<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4fc y6d8 w396 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">950<span class=\"_ _4\"></span>,000<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x4ff y6d8 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m2 x500 h1d y6d9 ff2 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>otal<span class=\"_ _1a9\"> </span></td><td class=\"c n x501 y515 w399 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,610<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x502 y515 w39a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">9<span class=\"_ _4\"></span>,008<span class=\"_ _4\"></span>,219<span class=\"_ _1\"></span>.36<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x503 y515 w39b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">16<span class=\"_ _1\"></span>,780<span class=\"_ _4\"></span>.64<span class=\"_ _1a9\"> </span></div></td></tr></table>In addition to the Negma funding,<span class=\"_ _4\"></span> a capital increase also took place in the context of the authorized capital b<span class=\"_ _4\"></span>y a contribution in cash of 10<span class=\"_ _25\"></span>,405<span class=\"_ _4\"></span>,500 euro and with the issuance of 7<span class=\"_ _25\"></span>,226<span class=\"_ _1\"></span>,039 new Oxurion NV shares at 1<span class=\"_ _1\"></span>.44 euro per share through a private equity p<span class=\"_ _4\"></span>lacement on March 7<span class=\"_ _0\"></span>, 2022<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _2f\"></span>8<span class=\"_ _27\"></span> <span class=\"_ _14f\"> </span><span class=\"ls0 ws0\">O<span class=\"_ _3\"></span>ther c<span class=\"_ _4\"></span>omprehens<span class=\"_ _4\"></span>ive in<span class=\"_ _4\"></span>come and </span>other<span class=\"_ _3\"></span> reser<span class=\"_ _23\"></span>ves<span class=\"_ _1a9\"> </span>The other comprehensive income is detailed as f<span class=\"_ _4\"></span>ollows:<span class=\"_ _1a9\"> </span><table class=\"s w39c h68\" id=\"_1fd62ee4-4ab6-4ab4-8c0c-cdd35a1c3021\"><tr><td></td><td class=\"t m1 x504 h12 y6da ff3 fsb fc7 sc0 ls1b wsbe\">CURRENCY </td><td class=\"t m1 x505 h12 y6db ff3 fsb fc7 sc0 ls1b wsbe\">REMEASURE<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></td><td class=\"t m1 x3f8 h12 y6da ff3 fsb fc7 sc0 ls1b ws0\">F<span class=\"_ _1\"></span>AIR V<span class=\"_ _4\"></span>ALUE ADJUST<span class=\"_ _1\"></span><span class=\"ls0\">-<span class=\"_ _1a9\"> </span></span></td><td></td></tr><tr><td class=\"t m1 x12d h12 y6dc ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x506 h12 y6dc ff3 fsb fc7 sc0 ls1b wsbe\">TRANSLA<span class=\"_ _1\"></span>TION<span class=\"_ _3\"></span> </td><td class=\"t m1 x507 h12 y6dd ff3 fsb fc7 sc0 ls1b ws0\">MENT DEFINED </td><td class=\"t m1 x508 h12 y6dc ff3 fsb fc7 sc0 ls1b ws0\">MENTS OF DEBT </td><td class=\"t m1 x3a0 h12 y6dd ff3 fsb fc7 sc0 ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _3\"></span> </td></tr><tr><td></td><td class=\"t m1 x509 h12 y6de ff3 fsb fc7 sc0 ls1b wsbe\">ADJUS<span class=\"_ _4\"></span>TMENT<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x50a h12 y6df ff3 fsb fc7 sc0 ls1b wsbe\">BENEFIT </td><td class=\"t m1 x50b h12 y6de ff3 fsb fc7 sc0 ls1b wsbe\">INSTRUMENTS<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x50c h12 y6df ff3 fsb fc7 sc0 ls1b wsbe\">OCI<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td></td><td class=\"t m1 x1f1 h12 y6e0 ff3 fsb fc7 sc0 ls1b wsbe\">PLANS<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y6e1 w364 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2020<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x50d y6e1 w39d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-378<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x50e y6e1 w39e h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-661<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x50f y6e1 w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x510 y6e1 w16b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-1,039<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6e2 w39f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Movements in OCI<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x511 y6e2 w175 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">122<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x512 y6e2 wae h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">566<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x513 y6e2 wb0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x514 y6e2 w2d3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">683<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6e3 w367 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x515 y6e3 w3a0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-256<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x516 y6e3 w3a1 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-95<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x517 y6e3 w3a2 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-5<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x518 y6e3 w190 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-356<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6e4 w39f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Movements in OCI<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x519 y6e4 wb5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">101<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51a y6e4 wad h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">361<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51b y6e4 wb0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51c y6e4 w3a3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">457<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w36c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51d y515 w3a4 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-155<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51e y515 w3a5 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">266<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51f y515 w3a6 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-10<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x520 y515 w1b0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">101<span class=\"_ _1a9\"> </span></div></td></tr></table>The other reserves movement is detailed as follo<span class=\"_ _4\"></span>ws:  <table class=\"s w3ad h6a\" id=\"_48b77af7-c278-4a37-8691-c9df9ac2a66c\"><tr><td></td><td class=\"t m1 x531 h12 y703 ff3 fsb fc7 sc0 ls1b wsbe\">SHARE-<span class=\"ls0 ws0\"> </span></td><td class=\"t m1 x532 h12 y703 ff3 fsb fc7 sc0 ls1b wsbe\">RET<span class=\"_ _1\"></span>AINED<span class=\"_ _3\"></span> </td><td class=\"t m1 x1f1 h12 y703 ff3 fsb fc7 sc0 ls1b ws0\" colspan=\"2\">F<span class=\"_ _1\"></span>AIR V<span class=\"_ _4\"></span>ALUE </td><td></td></tr><tr><td class=\"t m1 x12d h12 y704 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x531 h12 y705 ff3 fsb fc7 sc0 ls1b wsbe\">BASED </td><td class=\"t m1 x532 h12 y705 ff3 fsb fc7 sc0 ls1b wsbe\">EARNINGS </td><td class=\"t m1 x1f1 h12 y705 ff3 fsb fc7 sc0 ls1b wsbe\">ADJUS<span class=\"_ _4\"></span>T<span class=\"_ _1\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></td><td class=\"c n x533 y706 w3ae h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">OTHER<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x534 y706 w3af h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls3a ws221\">TOT<span class=\"_ _1\"></span>A<span class=\"_ _3\"></span>L<span class=\"_ _1a9\"> </span></div></td></tr><tr><td></td><td class=\"t m1 x531 h12 y707 ff3 fsb fc7 sc0 ls1b wsbe\">P<span class=\"_ _4\"></span>A<span class=\"_ _1\"></span>YMENT </td><td class=\"t m1 x532 h12 y707 ff3 fsb fc7 sc0 ls1b wsbe\">RESERVE </td><td class=\"t m1 x1f1 h12 y707 ff3 fsb fc7 sc0 ls1b wsbe\">MENT </td><td></td><td></td></tr><tr><td></td><td class=\"t m1 x531 h12 y708 ff3 fsb fc7 sc0 ls1b wsbe\">RESERVE<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x532 h12 y708 ff3 fsb fc7 sc0 ls1b wsbe\">FUND<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x1f1 h12 y708 ff3 fsb fc7 sc0 ls1b wsbe\">RESERVE<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"t m0 x12d h14 y709 ff2 fsd fc7 sc0 ls0 ws0\">31 December </td><td class=\"c n x535 y70a w3b0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">12,57<span class=\"_ _1\"></span>4<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x536 y70a w3b1 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-18,706<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x537 y70a w3b2 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-1<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x538 y70a w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x539 y70a w16c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-6<span class=\"_ _4\"></span>,133<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y70b ff2 fsd fc7 sc0 ls0 ws0\">2020<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"c xf0 y70c w3b3 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Movements in<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">other reserves<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53a y70d w3b4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,107<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53b y70d w18c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-453<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53c y70d w41 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">213<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53d y70d w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53e y70d w3b5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">867<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y70e ff2 fsd fc7 sc0 ls0 ws0\">31 December </td><td class=\"c n x53f y70f w3b6 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">13<span class=\"_ _4\"></span>,681<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x540 y70f w3b7 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-19<span class=\"_ _1\"></span>,159<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x541 y70f w3b8 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">212<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x542 y70f w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x543 y70f w3b9 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,266<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y710 ff2 fsd fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"c xf0 y711 w3b3 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Movements in<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">other reserves<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53a y712 w1a3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">933<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x544 y712 w3ba h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-38<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x545 y712 w1a0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,398<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x546 y712 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x547 y712 w3bb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">8,293<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y713 w3bc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ransfer*<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x548 y713 w3bd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-11,433<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x549 y713 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54a y713 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54b y713 w3be h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">11,433<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54c y713 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y714 ff2 fsd fc7 sc0 ls0 ws0\">31 December </td><td class=\"c n x53a y61b w3bf h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,181<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54d y61b w3c0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-19<span class=\"_ _4\"></span>,197<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54e y61b w3c1 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">7<span class=\"_ _25\"></span>,610<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54f y61b w3c2 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">11,433<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x550 y61b w3c3 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,027<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y715 ff2 fsd fc7 sc0 ls0 ws0\">2022<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td></tr></table>*As at December 31<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> the Group rec<span class=\"_ _4\"></span>lassed the recorded share-based payment reserve of the expired and exercised subscription rights to a categor<span class=\"_ _3\"></span>y \u2018other\u2019. The category \u2018Share-based reserve\u2019 expresses now the outstanding share-based payment liability<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>On August 2<span class=\"_ _4\"></span>4<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2020<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> by decision of an EGM of Oxurion,<span class=\"_ _1\"></span> a capital decrease w<span class=\"_ _4\"></span>as initiated and transferr<span class=\"_ _4\"></span>ed within equity to create a reserve fund classified as other reserves for an amount of 5<span class=\"_ _1\"></span>,532,596<span class=\"_ _1\"></span>.62 euro to be able to absorb future losses within the other reser<span class=\"_ _3\"></span>ves. F<span class=\"_ _25\"></span>or the movement in the share-based payment reserve we also refer to note 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.9 where the share-based payment expense of the period is disclosed as emplo<span class=\"_ _4\"></span>yee benefit expense<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Share-based payment plans<span class=\"_ _1a9\"> </span>The Group has cr<span class=\"_ _4\"></span>eated various subscription rights plans that can be granted to personnel and a subscription rights plan for Non-Executive Dir<span class=\"_ _4\"></span>ectors. Since the public listing,<span class=\"_ _4\"></span> all subscription rights p<span class=\"_ _4\"></span>lans have been created in respect of Oxurion.<span class=\"_ _1a9\"> </span>At December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022,<span class=\"_ _4\"></span> there are five outstanding sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>scription rights plans,<span class=\"_ _1\"></span> as follows:<span class=\"_ _1a9\"> </span><table class=\"s w3a7 h69\" id=\"_4830f676-916e-42d2-9529-3aeaef3de84b\"><tr><td class=\"t m1 x34d h12 y6e5 ff3 fsb fc7 sc0 ls1b ws0\">CREA<span class=\"_ _1\"></span>TION DA<span class=\"_ _1\"></span>TE OF PLAN<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x521 h12 y6e6 ff3 fsb fc7 sc0 ls1b ws0\">DA<span class=\"_ _1\"></span>TE GRAN<span class=\"ls0\">-<span class=\"_ _1a9\"> </span></span></td><td class=\"t m1 x522 h12 y6e6 ff3 fsb fc7 sc0 ls1b ws0\">EXERCISE PRICE </td><td class=\"t m1 x523 h12 y6e5 ff3 fsb fc7 sc0 ls1b wsbe\">BENEFICIARY<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td class=\"t m1 x524 h12 y6e7 ff3 fsb fc7 sc0 ls1b wsbe\">TED<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x525 h12 y6e7 ff3 fsb fc7 sc0 ls1b ws0\">(IN EURO)<span class=\"_ _1a9\"> </span></td><td></td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x526 h13 y6e8 ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees,<span class=\"_ _4\"></span> key </td></tr><tr><td class=\"c n xf0 y6e9 w3a8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws259\">Subscription Rights Plan 2017<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x527 y6e9 w3a9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2017-2020</div></td><td class=\"t m2 x522 h13 y6ea ff1 fsc fc7 sc0 ls0 ws0\">Between 2.64 </td><td class=\"t m2 x528 h13 y6ea ff1 fsc fc7 sc0 ls0 ws0\">consultants and </td></tr><tr><td></td><td></td><td class=\"t m2 x529 h13 y6eb ff1 fsc fc7 sc0 ls0 ws0\">and 6<span class=\"_ _4\"></span>.55<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x526 h13 y6eb ff1 fsc fc7 sc0 ls0 ws0\">directors of the </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x3ea h13 y6ec ff1 fsc fc7 sc0 ls0 ws0\">Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6ed ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td></td><td class=\"t m2 x52a h13 y6ee ff1 fsc fc7 sc0 ls0 ws0\">Non-Executive </td></tr><tr><td class=\"t m2 x34d h13 y6ef ff1 fsc fc7 sc0 ls0 ws0\">2020<span class=\"_ _1a9\"> </span></td><td class=\"c n x52b y6f0 w3aa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x52c y6f0 w3ab h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.57</div></td><td class=\"t m2 x526 h13 y6f1 ff1 fsc fc7 sc0 ls0 ws0\">Directors of the </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x3ea h13 y6f2 ff1 fsc fc7 sc0 ls0 ws0\">Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6f3 ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td class=\"t m2 x3ed h13 y6f3 ff1 fsc fc7 sc0 ls0 ws0\">Between 1<span class=\"_ _4\"></span>.75 </td><td class=\"t m2 x526 h13 y6f4 ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees and </td></tr><tr><td class=\"t m2 x34d h13 y6f5 ff1 fsc fc7 sc0 ls0 ws0\">2021-1<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x52d h13 y6f6 ff1 fsc fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x529 h13 y6f5 ff1 fsc fc7 sc0 ls0 ws0\">and 2.60<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x528 h13 y6f6 ff1 fsc fc7 sc0 ls0 ws0\">key consultants </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x52e h13 y6f7 ff1 fsc fc7 sc0 ls0 ws0\">of the Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6f8 ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td></td><td class=\"t m2 x526 h13 y6f9 ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees and </td></tr><tr><td class=\"t m2 x34d h13 y6fa ff1 fsc fc7 sc0 ls0 ws0\">2021-2<span class=\"_ _1a9\"> </span></td><td class=\"c n x52b y6fb w3aa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x52f y6fb w3ac h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>.75</div></td><td class=\"t m2 x528 h13 y6fc ff1 fsc fc7 sc0 ls0 ws0\">key consultants </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x52e h13 y6fd ff1 fsc fc7 sc0 ls0 ws0\">of the Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6fe ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td class=\"t m2 x3e8 h13 y6fe ff1 fsc fc7 sc0 ls0 ws0\">Between 0<span class=\"_ _1\"></span>.444 </td><td class=\"t m2 x526 h13 y6ff ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees and </td></tr><tr><td class=\"t m2 x34d h13 y700 ff1 fsc fc7 sc0 ls0 ws0\">2021-3<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x530 h13 y701 ff1 fsc fc7 sc0 ls0 ws0\">2021-2022<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x525 h13 y700 ff1 fsc fc7 sc0 ls0 ws0\">and 1<span class=\"_ _4\"></span>.82<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x528 h13 y701 ff1 fsc fc7 sc0 ls0 ws0\">key consultants </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x52e h13 y702 ff1 fsc fc7 sc0 ls0 ws0\">of the Group<span class=\"_ _1a9\"> </span></td></tr></table>Brief overview of all outstanding subscription rights granted between 2017<span class=\"_ _1\"></span> and December 31<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022<span class=\"_ _1a9\"> </span>Subscription Rights Plan 2017<span class=\"_ _1a9\"> </span>On November 20<span class=\"_ _25\"></span>, 2017<span class=\"_ _0\"></span>,<span class=\"_ _4\"></span> the EGM of Oxurion decided to<span class=\"_ _1a9\"> </span> issue the Subscription Rights Plan 2017<span class=\"_ _4\"></span> (formerl<span class=\"_ _4\"></span>y referr<span class=\"_ _4\"></span>ed<span class=\"_ _1a9\"> </span> to as the warr<span class=\"_ _4\"></span>ants plan 2017)<span class=\"_ _1\"></span>. Under this Subscription<span class=\"_ _1a9\"> </span> Rights Plan 2017<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> which has a term of ten years and all<span class=\"_ _1a9\"> </span> will lapse in 2027<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> a maximum of 1,440<span class=\"_ _25\"></span>,000 subscription<span class=\"_ _1a9\"> </span> rights can be issued and granted to emplo<span class=\"_ _4\"></span>yees<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> dir<span class=\"_ _4\"></span>ectors,<span class=\"_ _1\"></span> and consultants of the Group<span class=\"_ _4\"></span>. Eac<span class=\"_ _4\"></span>h subscription right<span class=\"_ _1a9\"> </span> entitles the holder to subscribe to one Oxurion share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> Subscription rights are granted under this p<span class=\"_ _4\"></span>lan by the<span class=\"_ _1a9\"> </span> Board of Directors or the Nomination and Rem<span class=\"_ _4\"></span>uneration<span class=\"_ _1a9\"> </span> Committee,<span class=\"_ _1\"></span> except for directors<span class=\"_ _4\"></span>. Authority to grant sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>scription rights to directors is held b<span class=\"_ _4\"></span>y the general meeting<span class=\"_ _1a9\"> </span> of shareholders<span class=\"_ _4\"></span>. Subscription rights are off<span class=\"_ _4\"></span>ered free of<span class=\"_ _1a9\"> </span> charge<span class=\"_ _4\"></span>. The exercise price is equal to the lo<span class=\"_ _4\"></span>w<span class=\"_ _4\"></span>er of (i) the<span class=\"_ _1a9\"> </span> average of the c<span class=\"_ _4\"></span>losing prices of the share on the stoc<span class=\"_ _4\"></span>k<span class=\"_ _1a9\"> </span> market during the 30 days prior to the offering of a sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>scription right or (ii) the closing price on the last stock<span class=\"_ _1a9\"> </span> market day prior to the offer<span class=\"_ _1\"></span>. Subscription rights granted<span class=\"_ _1a9\"> </span> under this plan have a thr<span class=\"_ _4\"></span>ee year gr<span class=\"_ _4\"></span>aded vesting (50%<span class=\"_ _1a9\"> </span> after 2 years and 50% after 3 y<span class=\"_ _4\"></span>ears) with no performance<span class=\"_ _1a9\"> </span> conditions. T<span class=\"_ _4\"></span>he conditions under which a subscription right<span class=\"_ _1a9\"> </span> holder is entitled to exercise a subscription right are estab<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lished by the Nomination and Remuner<span class=\"_ _4\"></span>ation Committee.<span class=\"_ _1a9\"> </span> Subscription Rights Plan 2020<span class=\"_ _1a9\"> </span>On December 23<span class=\"_ _1\"></span>, 2020<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> the Board of Directors pr<span class=\"_ _4\"></span>oposed<span class=\"_ _1a9\"> </span> to issue the Oxurion 2020 Subscription Rights Plan,<span class=\"_ _4\"></span> which<span class=\"_ _1a9\"> </span> was decided b<span class=\"_ _4\"></span>y the A<span class=\"_ _4\"></span>GM held in May 2019<span class=\"_ _1\"></span>. Under this<span class=\"_ _1a9\"> </span> Subscription Rights Plan 2020<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> which has a term of ten<span class=\"_ _1a9\"> </span> years and all subscription rights will lapse in 2030<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> a<span class=\"_ _1a9\"> </span> maximum of 150<span class=\"_ _1\"></span>,000 subscription rights can be issued<span class=\"_ _1a9\"> </span> and granted to Non-Executive Director<span class=\"_ _4\"></span>s of Oxurion. Each<span class=\"_ _1a9\"> </span> subscription right entitles the holder to subscribe to one<span class=\"_ _1a9\"> </span> Oxurion share subject to the payment of the exercise price<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> The exercise price is equal to the lo<span class=\"_ _4\"></span>wer of (i) the a<span class=\"_ _4\"></span>verage<span class=\"_ _1a9\"> </span> of the closing prices of a share on the stoc<span class=\"_ _4\"></span>k market during<span class=\"_ _1a9\"> </span> the 30 days prior to the offering of a subscription right or<span class=\"_ _1a9\"> </span> (ii) the closing price on the last stock market day prior to<span class=\"_ _1a9\"> </span> the offer<span class=\"_ _1\"></span>. Subscription rights granted under this plan ha<span class=\"_ _4\"></span>ve a<span class=\"_ _1a9\"> </span> contractual term of ten y<span class=\"_ _4\"></span>ears and vest immediately<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span> Subscription Rights Plans 2021<span class=\"_ _1a9\"> </span>On April 14<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2021,<span class=\"_ _1\"></span> the Board of Directors of Oxurion<span class=\"_ _1a9\"> </span> decided to issue the Subscription Rights Plan 2021-1<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> Under this Subscription Rights Plan 2021-1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> which has a<span class=\"_ _1a9\"> </span> term of ten years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and all subscription rights will lapse in<span class=\"_ _1a9\"> </span> 2031<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> a maximum of 1<span class=\"_ _1\"></span>.085 million subscription rights can<span class=\"_ _1a9\"> </span> be issued and granted to emplo<span class=\"_ _4\"></span>yees i and consultants of<span class=\"_ _1a9\"> </span> the Group<span class=\"_ _4\"></span>. Eac<span class=\"_ _4\"></span>h subscription right entitles the holder to<span class=\"_ _1a9\"> </span> subscribe to one Oxurion share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On September 22,<span class=\"_ _4\"></span> 2021<span class=\"_ _1\"></span>, the Boar<span class=\"_ _4\"></span>d of Directors of Oxurion<span class=\"_ _1a9\"> </span> has decided to issue the Subscription Rights Plan 2021-2.<span class=\"_ _1a9\"> </span> Under this Subscription Rights Plan 2021-2,<span class=\"_ _4\"></span> which has<span class=\"_ _1a9\"> </span> a term of ten years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and all subscription rights will lapse<span class=\"_ _1a9\"> </span> in 2031<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> a maximum of 550<span class=\"_ _1\"></span>,000 subscription rights can<span class=\"_ _1a9\"> </span> be issued and granted to emplo<span class=\"_ _4\"></span>yees and consultants of<span class=\"_ _1a9\"> </span> the Group<span class=\"_ _4\"></span>. Eac<span class=\"_ _4\"></span>h subscription right entitles the holder to<span class=\"_ _1a9\"> </span> subscribe to one Oxurion share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On December 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _1\"></span>, the Boar<span class=\"_ _4\"></span>d of Directors of Oxurion<span class=\"_ _1a9\"> </span> has decided to issue the Subscription Rights Plan 2021-3<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span> Under this Subscription Rights Plan 2021-3<span class=\"_ _1\"></span>, whic<span class=\"_ _4\"></span>h has a<span class=\"_ _1a9\"> </span> term of ten years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and all will lapse in 203<span class=\"_ _4\"></span>1<span class=\"_ _1\"></span>, a maximum of<span class=\"_ _1a9\"> </span> 862,000 subscription rights can be issued and granted to<span class=\"_ _1a9\"> </span> emplo<span class=\"_ _4\"></span>yees and consultants of the Group<span class=\"_ _1\"></span>. Each subscrip<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion right entitles the holder to subscribe to one Oxurion<span class=\"_ _1a9\"> </span> share<span class=\"_ _4\"></span>.  These plans ar<span class=\"_ _4\"></span>e collectively r<span class=\"_ _4\"></span>eferred to as the<span class=\"_ _1a9\"> </span> Subscription Rights Plans 2021<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Subscription rights are granted under the Subscription<span class=\"_ _1a9\"> </span> Rights Plans 2021 by the Board of Dir<span class=\"_ _4\"></span>ectors or the<span class=\"_ _1a9\"> </span> Nomination and Remuneration Committee<span class=\"_ _4\"></span>. Subscription<span class=\"_ _1a9\"> </span> rights are offer<span class=\"_ _4\"></span>ed free of charge<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he exercise price is<span class=\"_ _1a9\"> </span> equal to the low<span class=\"_ _4\"></span>er of (i) the volume weighted a<span class=\"_ _4\"></span>verage price<span class=\"_ _1a9\"> </span> (VW<span class=\"_ _1\"></span>AP) of the Company\u2019<span class=\"_ _25\"></span>s shares on the stock exchange over a period of thirty calendar days prior to the date of the offer or (ii) the closing price of the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s shares on the last business day prior to the date of the offer<span class=\"_ _1\"></span>. In general,<span class=\"_ _4\"></span> half of the subscription rights under these p<span class=\"_ _4\"></span>lans vest after one year and the other half vest quarterly over the follo<span class=\"_ _4\"></span>wing two y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or the subscription rights granted in April 2021 under the Subscription Rights Plan 2021-1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the vesting period exceptionally commenced on December 28<span class=\"_ _1\"></span>, 2020<span class=\"_ _25\"></span>. The conditions under which a subscription rights holder is entitled to exercise a subscription right are estab<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lished by the Nomination and Remuner<span class=\"_ _4\"></span>ation Committee. The grant date f<span class=\"_ _4\"></span>air values of the subscription rights granted under the different Subscription Plans ha<span class=\"_ _4\"></span>ve been deter<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mined by using the Blac<span class=\"_ _4\"></span>k &amp; Scholes model,<span class=\"_ _4\"></span> taking into account the follo<span class=\"_ _4\"></span>wing assumptions:<span class=\"_ _1a9\"> </span>2017 SUBSCRIPTION PLAN<span class=\"_ _175\"> </span><span class=\"wsbe\">ASSUMPTIONS<span class=\"_ _1a9\"> </span></span>GRANT DA<span class=\"_ _1\"></span>TE<span class=\"_ _176\"> </span>DEC 17<span class=\"_ _6\"> </span>DEC 17<span class=\"_ _6\"> </span>JUN 18<span class=\"_ _1f\"> </span>DEC 18<span class=\"_ _1f\"> </span>DEC 18<span class=\"_ _2\"> </span>JUL 19<span class=\"_ _1f\"> </span>DEC 19<span class=\"_ _1f\"> </span>DEC 19<span class=\"_ _b\"> </span>JUN 20<span class=\"_ _177\"> </span>AUG 20<span class=\"_ _1a9\"> </span>Number of warrants gr<span class=\"_ _4\"></span>anted<span class=\"_ _12\"> </span>251<span class=\"_ _4\"></span>,000<span class=\"_ _67\"> </span>150<span class=\"_ _4\"></span>,000<span class=\"_ _12\"> </span>33<span class=\"_ _4\"></span>,500<span class=\"_ _5a\"> </span>208,000<span class=\"_ _67\"> </span>150<span class=\"_ _4\"></span>,000<span class=\"_ _12\"> </span>44,300<span class=\"_ _65\"> </span>136<span class=\"_ _4\"></span>,000<span class=\"_ _65\"> </span>125,000<span class=\"_ _12\"> </span>43<span class=\"_ _4\"></span>,500<span class=\"_ _b1\"> </span>10<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span>Current share price on grant date (in euro)<span class=\"_ _1a9\"> </span>3<span class=\"_ _4\"></span>.38<span class=\"_ _35\"> </span>3<span class=\"_ _1\"></span>.38<span class=\"_ _56\"> </span>7<span class=\"_ _1\"></span>.07<span class=\"_ _35\"> </span>3<span class=\"_ _4\"></span>.52<span class=\"_ _45\"> </span>3.52<span class=\"_ _32\"> </span>4.65<span class=\"_ _5d\"> </span>2.875<span class=\"_ _b\"> </span>2.875<span class=\"_ _35\"> </span>3.07<span class=\"_ _45\"> </span>2.72<span class=\"_ _1a9\"> </span>Exercise price<span class=\"_ _2c\"> </span>3<span class=\"_ _4\"></span>.38<span class=\"_ _5d\"> </span>4<span class=\"_ _4\"></span>.593<span class=\"_ _5d\"> </span>6<span class=\"_ _1\"></span>.549<span class=\"_ _e2\"> </span><span class=\"ls3e ws222\">3.4<span class=\"_ _b\"> </span></span>4.593<span class=\"_ _5d\"> </span>3.822<span class=\"_ _32\"> </span>2.64<span class=\"_ _5d\"> </span>4.593<span class=\"_ _b\"> </span>2.847<span class=\"_ _73\"> </span>2.8<span class=\"_ _1a9\"> </span>Expected dividend yield<span class=\"_ _116\"> </span>-<span class=\"_ _105\"> </span>-<span class=\"_ _103\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _103\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _1a9\"> </span>Expected stock price volatility<span class=\"_ _48\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _7d\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _2\"> </span>60%<span class=\"_ _7d\"> </span>60%<span class=\"_ _7d\"> </span>60%<span class=\"_ _2\"> </span>60%<span class=\"_ _1a9\"> </span>Risk<span class=\"_ _4\"></span>-free interest r<span class=\"_ _4\"></span>ate<span class=\"_ _28\"> </span>0<span class=\"_ _4\"></span>.59%<span class=\"_ _1b\"> </span>0<span class=\"_ _4\"></span>.59%<span class=\"_ _177\"> </span>0<span class=\"_ _4\"></span>.73%<span class=\"_ _1b\"> </span>0<span class=\"_ _4\"></span>.69%<span class=\"_ _f\"> </span>0.69%<span class=\"_ _b1\"> </span>-0.25%<span class=\"_ _f\"> </span>-0<span class=\"_ _1\"></span>.12%<span class=\"_ _1b\"> </span>-0<span class=\"_ _4\"></span>.12%<span class=\"_ _7e\"> </span>-0<span class=\"_ _4\"></span>.23%<span class=\"_ _7e\"> </span>-0<span class=\"_ _1\"></span>.38%<span class=\"_ _1a9\"> </span>Expected duration<span class=\"_ _55\"> </span>10<span class=\"_ _13\"> </span>10<span class=\"_ _3a\"> </span><span class=\"ls52 ws25b\">9.<span class=\"_ _23\"></span>5<span class=\"_ _2b\"> </span></span>9<span class=\"_ _101\"> </span>9<span class=\"_ _79\"> </span><span class=\"ls3e ws222\">8.<span class=\"_ _3\"></span>5<span class=\"_ _53\"> </span></span>8<span class=\"_ _82\"> </span>8<span class=\"_ _38\"> </span><span class=\"ls53 ws25c\">7.<span class=\"_ _23\"></span>5<span class=\"_ _36\"> </span>7.<span class=\"_ _23\"></span>5<span class=\"_ _1a9\"> </span></span>F<span class=\"_ _4\"></span>air value<span class=\"_ _118\"> </span>1<span class=\"_ _4\"></span>.56<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.29<span class=\"_ _35\"> </span>3<span class=\"_ _4\"></span>.33<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.58<span class=\"_ _36\"> </span><span class=\"ls4d ws252\">1.3<span class=\"_ _35\"> </span></span>2.23<span class=\"_ _74\"> </span>1.75<span class=\"_ _56\"> </span>1.43<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.83<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.56<span class=\"_ _1a9\"> </span>2020 SUBSCRIPTION PLAN<span class=\"_ _b6\"> </span><span class=\"wsbe\">ASSUMPTIONS<span class=\"_ _1a9\"> </span></span>GRANT DA<span class=\"_ _1\"></span>TE<span class=\"_ _1c\"> </span>MAR 21<span class=\"_ _1a9\"> </span>Number of warrants gr<span class=\"_ _4\"></span>anted<span class=\"_ _9e\"> </span>75<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span>Current share price on grant date (in euro)<span class=\"_ _1a9\"> </span>2.55<span class=\"_ _1a9\"> </span>Exercise price<span class=\"_ _17a\"> </span>2.57<span class=\"_ _1a9\"> </span>Expected dividend yield<span class=\"_ _17b\"> </span>-<span class=\"_ _1a9\"> </span>Expected stock price volatility<span class=\"_ _9\"> </span>45%<span class=\"_ _1a9\"> </span>Risk<span class=\"_ _4\"></span>-free interest r<span class=\"_ _4\"></span>ate<span class=\"_ _10b\"> </span>-0.16%<span class=\"_ _1a9\"> </span>Expected duration<span class=\"_ _113\"> </span>9<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>air value<span class=\"_ _97\"> </span>1<span class=\"_ _4\"></span>.23<span class=\"_ _1a9\"> </span>The assumptions used in determining the fair value of the subscription rights gr<span class=\"_ _4\"></span>anted are based on the follo<span class=\"_ _4\"></span>wing data: \u2022 <span class=\"_ _62\"> </span><span class=\"ws6e\">Current share price on grant date \u2013 the c<span class=\"_ _4\"></span>losing price </span>on the stock market of Euronext Brussels<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws58\">Expected stock price volatility \u2013 the historical volatility </span>of Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s share price.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws25d\">Expected duration \u2013 calculated as the estimated </span><table class=\"s w3c4 h6b\" id=\"_520e5b8c-0cd4-4774-8e2e-f3f3b3713294\"><tr><td class=\"t m1 x552 he y716 ff1 fs9 fc7 sc0 ls0 ws75\">duration until exercise<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> taking into account the specific </td></tr><tr><td class=\"t m1 x552 he y717 ff1 fs9 fc7 sc0 ls0 ws0\">features of the p<span class=\"_ _4\"></span>lans.<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m1 x553 he y718 ff1 fs9 fc7 sc0 ls0 ws0\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws31\">Risk<span class=\"_ _4\"></span>-free inter<span class=\"_ _4\"></span>est rate \u2013 based on the Belgian go<span class=\"_ _4\"></span>vern<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></span></td></tr><tr><td class=\"t m1 x552 he y719 ff1 fs9 fc7 sc0 ls0 ws39\">ment bond rates at the date of granting with a term </td></tr><tr><td class=\"t m1 x552 he y71a ff1 fs9 fc7 sc0 ls0 ws0\">equal to the expected life of the subscription rights<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></td></tr></table>Movements in the number of subscription rights outstand<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ing and their related w<span class=\"_ _4\"></span>eighted average exercise prices ar<span class=\"_ _4\"></span>e as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span><table class=\"s w20d h6c\" id=\"_7c714e05-b03c-4d67-997b-b6b9644ab0c0\"><tr><td></td><td class=\"c n x554 y71b w61 h41\" colspan=\"2\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x555 y71b w62 h41\" colspan=\"2\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td></td><td class=\"t m1 x556 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">A<span class=\"_ _4\"></span>VERA<span class=\"_ _4\"></span>GE </td><td class=\"t m1 x3a2 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">SUB-<span class=\"ls0 ws0\"> </span></td><td class=\"t m1 x557 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">A<span class=\"_ _4\"></span>VERA<span class=\"_ _4\"></span>GE </td><td class=\"t m1 x558 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">SUB-<span class=\"ls0 ws0\"> </span></td></tr><tr><td></td><td class=\"t m1 x556 h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">EXERCISE </td><td class=\"t m1 x50a h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">SCRIPTION <span class=\"_ _0\"></span><span class=\"ls0 ws0\"> </span></td><td class=\"t m1 x557 h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">EXERCISE </td><td class=\"t m1 x559 h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">SCRIPTION <span class=\"_ _0\"></span><span class=\"ls0 ws0\"> </span></td></tr><tr><td></td><td class=\"t m1 x55a h12 y71e ff3 fsb fc7 sc0 ls1b ws0\">PRICE IN EUR<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x55b h12 y71e ff3 fsb fc7 sc0 ls1b wsbe\">RIGHTS<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x401 h12 y71e ff3 fsb fc7 sc0 ls1b ws0\">PRICE IN EUR<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x55c h12 y71e ff3 fsb fc7 sc0 ls1b wsbe\">RIGHTS<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y71f w3c5 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">As at 1 January<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x55d y71f w3c6 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">2.52<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x55e y71f w3c7 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,131<span class=\"_ _4\"></span>,250<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x55f y71f w3c8 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>.84<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x560 y71f w3c9 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">893,800<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y720 w3ca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Granted<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> accepted<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x561 y720 w3cb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.44<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x562 y720 wca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,000<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x563 y720 w3cc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.11<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x564 y720 w3cd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,431,000<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y721 w3ce h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>orfeited<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x565 y721 w3cf h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.46<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x566 y721 w3d0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-172,970<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x567 y721 w3d1 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3.30<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x568 y721 w3d2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-193<span class=\"_ _4\"></span>,550<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y722 w3d3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Exercised<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x569 y722 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56a y722 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56b y722 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56c y722 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w3d4 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">As at 31 December<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56d y515 w3d5 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2.54<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56e y515 w3d6 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2,959<span class=\"_ _4\"></span>,280<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56f y515 w3d7 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2.52<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x570 y515 w3d8 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">3<span class=\"_ _1\"></span>,131,250<span class=\"_ _1a9\"> </span></div></td></tr></table>Outstanding vested subscription rights at December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> have the f<span class=\"_ _4\"></span>ollowing ear<span class=\"_ _4\"></span>liest exercise date,<span class=\"_ _1\"></span> maturities and exercise prices:<span class=\"_ _1a9\"> </span>EARLIEST EXERCISE D<span class=\"_ _3\"></span>AT<span class=\"_ _5\"> </span>E<span class=\"_ _1a9\"> </span>EXPIRY DA<span class=\"_ _1\"></span>TE<span class=\"_ _1a9\"> </span>EXERCISE PRICE (IN EURO)<span class=\"_ _1a9\"> </span>NUMBER (THOUSANDS)<span class=\"_ _1a9\"> </span>2023<span class=\"_ _11e\"> </span>2027<span class=\"_ _9\"> </span>3<span class=\"_ _4\"></span>.95<span class=\"_ _91\"> </span>692<span class=\"_ _1a9\"> </span>2023<span class=\"_ _179\"> </span>2030<span class=\"_ _91\"> </span>2.57<span class=\"_ _84\"> </span>60<span class=\"_ _1a9\"> </span>2023<span class=\"_ _117\"> </span>203<span class=\"_ _4\"></span>1<span class=\"_ _94\"> </span>2.23<span class=\"_ _fe\"> </span>1,171<span class=\"_ _1a9\"> </span>T<span class=\"_ _1\"></span>otal weighted average<span class=\"_ _1a9\"> </span>2.86<span class=\"_ _80\"> </span>1<span class=\"_ _4\"></span>,923<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfShareCapitalReservesAndOtherEquityInterestExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-124": {
   "value": "5<span class=\"_ _27\"></span>.<span class=\"_ _27\"></span>7.<span class=\"_ _2f\"></span>8<span class=\"_ _27\"></span> <span class=\"_ _14f\"> </span><span class=\"ls0 ws0\">O<span class=\"_ _3\"></span>ther c<span class=\"_ _4\"></span>omprehens<span class=\"_ _4\"></span>ive in<span class=\"_ _4\"></span>come and </span>other<span class=\"_ _3\"></span> reser<span class=\"_ _23\"></span>ves<span class=\"_ _1a9\"> </span>The other comprehensive income is detailed as f<span class=\"_ _4\"></span>ollows:<span class=\"_ _1a9\"> </span><table class=\"s w39c h68\" id=\"_1fd62ee4-4ab6-4ab4-8c0c-cdd35a1c3021\"><tr><td></td><td class=\"t m1 x504 h12 y6da ff3 fsb fc7 sc0 ls1b wsbe\">CURRENCY </td><td class=\"t m1 x505 h12 y6db ff3 fsb fc7 sc0 ls1b wsbe\">REMEASURE<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></td><td class=\"t m1 x3f8 h12 y6da ff3 fsb fc7 sc0 ls1b ws0\">F<span class=\"_ _1\"></span>AIR V<span class=\"_ _4\"></span>ALUE ADJUST<span class=\"_ _1\"></span><span class=\"ls0\">-<span class=\"_ _1a9\"> </span></span></td><td></td></tr><tr><td class=\"t m1 x12d h12 y6dc ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x506 h12 y6dc ff3 fsb fc7 sc0 ls1b wsbe\">TRANSLA<span class=\"_ _1\"></span>TION<span class=\"_ _3\"></span> </td><td class=\"t m1 x507 h12 y6dd ff3 fsb fc7 sc0 ls1b ws0\">MENT DEFINED </td><td class=\"t m1 x508 h12 y6dc ff3 fsb fc7 sc0 ls1b ws0\">MENTS OF DEBT </td><td class=\"t m1 x3a0 h12 y6dd ff3 fsb fc7 sc0 ls3a ws221\">TOT<span class=\"_ _4\"></span>AL<span class=\"_ _3\"></span> </td></tr><tr><td></td><td class=\"t m1 x509 h12 y6de ff3 fsb fc7 sc0 ls1b wsbe\">ADJUS<span class=\"_ _4\"></span>TMENT<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x50a h12 y6df ff3 fsb fc7 sc0 ls1b wsbe\">BENEFIT </td><td class=\"t m1 x50b h12 y6de ff3 fsb fc7 sc0 ls1b wsbe\">INSTRUMENTS<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x50c h12 y6df ff3 fsb fc7 sc0 ls1b wsbe\">OCI<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td></td><td class=\"t m1 x1f1 h12 y6e0 ff3 fsb fc7 sc0 ls1b wsbe\">PLANS<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"c n xf0 y6e1 w364 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2020<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x50d y6e1 w39d h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-378<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x50e y6e1 w39e h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-661<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x50f y6e1 w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x510 y6e1 w16b h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-1,039<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6e2 w39f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Movements in OCI<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x511 y6e2 w175 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">122<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x512 y6e2 wae h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">566<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x513 y6e2 wb0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x514 y6e2 w2d3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">683<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6e3 w367 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x515 y6e3 w3a0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-256<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x516 y6e3 w3a1 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-95<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x517 y6e3 w3a2 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-5<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x518 y6e3 w190 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-356<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y6e4 w39f h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Movements in OCI<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x519 y6e4 wb5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">101<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51a y6e4 wad h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">361<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51b y6e4 wb0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-5<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51c y6e4 w3a3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">457<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w36c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">31 December 2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51d y515 w3a4 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-155<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51e y515 w3a5 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">266<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x51f y515 w3a6 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-10<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x520 y515 w1b0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">101<span class=\"_ _1a9\"> </span></div></td></tr></table>The other reserves movement is detailed as follo<span class=\"_ _4\"></span>ws:  <table class=\"s w3ad h6a\" id=\"_48b77af7-c278-4a37-8691-c9df9ac2a66c\"><tr><td></td><td class=\"t m1 x531 h12 y703 ff3 fsb fc7 sc0 ls1b wsbe\">SHARE-<span class=\"ls0 ws0\"> </span></td><td class=\"t m1 x532 h12 y703 ff3 fsb fc7 sc0 ls1b wsbe\">RET<span class=\"_ _1\"></span>AINED<span class=\"_ _3\"></span> </td><td class=\"t m1 x1f1 h12 y703 ff3 fsb fc7 sc0 ls1b ws0\" colspan=\"2\">F<span class=\"_ _1\"></span>AIR V<span class=\"_ _4\"></span>ALUE </td><td></td></tr><tr><td class=\"t m1 x12d h12 y704 ff3 fsb fc7 sc0 ls1b ws0\">IN '000 EURO<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x531 h12 y705 ff3 fsb fc7 sc0 ls1b wsbe\">BASED </td><td class=\"t m1 x532 h12 y705 ff3 fsb fc7 sc0 ls1b wsbe\">EARNINGS </td><td class=\"t m1 x1f1 h12 y705 ff3 fsb fc7 sc0 ls1b wsbe\">ADJUS<span class=\"_ _4\"></span>T<span class=\"_ _1\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span></td><td class=\"c n x533 y706 w3ae h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">OTHER<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x534 y706 w3af h41\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls3a ws221\">TOT<span class=\"_ _1\"></span>A<span class=\"_ _3\"></span>L<span class=\"_ _1a9\"> </span></div></td></tr><tr><td></td><td class=\"t m1 x531 h12 y707 ff3 fsb fc7 sc0 ls1b wsbe\">P<span class=\"_ _4\"></span>A<span class=\"_ _1\"></span>YMENT </td><td class=\"t m1 x532 h12 y707 ff3 fsb fc7 sc0 ls1b wsbe\">RESERVE </td><td class=\"t m1 x1f1 h12 y707 ff3 fsb fc7 sc0 ls1b wsbe\">MENT </td><td></td><td></td></tr><tr><td></td><td class=\"t m1 x531 h12 y708 ff3 fsb fc7 sc0 ls1b wsbe\">RESERVE<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x532 h12 y708 ff3 fsb fc7 sc0 ls1b wsbe\">FUND<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x1f1 h12 y708 ff3 fsb fc7 sc0 ls1b wsbe\">RESERVE<span class=\"_ _1a9\"> </span></td><td></td><td></td></tr><tr><td class=\"t m0 x12d h14 y709 ff2 fsd fc7 sc0 ls0 ws0\">31 December </td><td class=\"c n x535 y70a w3b0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">12,57<span class=\"_ _1\"></span>4<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x536 y70a w3b1 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-18,706<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x537 y70a w3b2 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-1<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x538 y70a w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x539 y70a w16c h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-6<span class=\"_ _4\"></span>,133<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y70b ff2 fsd fc7 sc0 ls0 ws0\">2020<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"c xf0 y70c w3b3 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Movements in<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">other reserves<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53a y70d w3b4 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>,107<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53b y70d w18c h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-453<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53c y70d w41 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">213<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53d y70d w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53e y70d w3b5 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">867<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y70e ff2 fsd fc7 sc0 ls0 ws0\">31 December </td><td class=\"c n x53f y70f w3b6 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">13<span class=\"_ _4\"></span>,681<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x540 y70f w3b7 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-19<span class=\"_ _1\"></span>,159<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x541 y70f w3b8 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">212<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x542 y70f w16a h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x543 y70f w3b9 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-5<span class=\"_ _4\"></span>,266<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y710 ff2 fsd fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td></tr><tr><td class=\"c xf0 y711 w3b3 h4b\"><div class=\"t m2 xca h13 y617 ff1 fsc fc7 sc0 ls0 ws0\">Movements in<span class=\"_ _1a9\"> </span></div><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">other reserves<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x53a y712 w1a3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">933<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x544 y712 w3ba h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-38<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x545 y712 w1a0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">7<span class=\"_ _1\"></span>,398<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x546 y712 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x547 y712 w3bb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">8,293<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y713 w3bc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">T<span class=\"_ _1\"></span>ransfer*<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x548 y713 w3bd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-11,433<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x549 y713 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54a y713 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54b y713 w3be h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">11,433<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54c y713 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y714 ff2 fsd fc7 sc0 ls0 ws0\">31 December </td><td class=\"c n x53a y61b w3bf h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,181<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54d y61b w3c0 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">-19<span class=\"_ _4\"></span>,197<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54e y61b w3c1 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">7<span class=\"_ _25\"></span>,610<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x54f y61b w3c2 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">11,433<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x550 y61b w3c3 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,027<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"t m0 x12d h14 y715 ff2 fsd fc7 sc0 ls0 ws0\">2022<span class=\"_ _1a9\"> </span></td><td></td><td></td><td></td><td></td><td></td></tr></table>*As at December 31<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> the Group rec<span class=\"_ _4\"></span>lassed the recorded share-based payment reserve of the expired and exercised subscription rights to a categor<span class=\"_ _3\"></span>y \u2018other\u2019. The category \u2018Share-based reserve\u2019 expresses now the outstanding share-based payment liability<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>On August 2<span class=\"_ _4\"></span>4<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2020<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> by decision of an EGM of Oxurion,<span class=\"_ _1\"></span> a capital decrease w<span class=\"_ _4\"></span>as initiated and transferr<span class=\"_ _4\"></span>ed within equity to create a reserve fund classified as other reserves for an amount of 5<span class=\"_ _1\"></span>,532,596<span class=\"_ _1\"></span>.62 euro to be able to absorb future losses within the other reser<span class=\"_ _3\"></span>ves. F<span class=\"_ _25\"></span>or the movement in the share-based payment reserve we also refer to note 5<span class=\"_ _1\"></span>.6<span class=\"_ _1\"></span>.9 where the share-based payment expense of the period is disclosed as emplo<span class=\"_ _4\"></span>yee benefit expense<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Share-based payment plans<span class=\"_ _1a9\"> </span>The Group has cr<span class=\"_ _4\"></span>eated various subscription rights plans that can be granted to personnel and a subscription rights plan for Non-Executive Dir<span class=\"_ _4\"></span>ectors. Since the public listing,<span class=\"_ _4\"></span> all subscription rights p<span class=\"_ _4\"></span>lans have been created in respect of Oxurion.<span class=\"_ _1a9\"> </span>At December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022,<span class=\"_ _4\"></span> there are five outstanding sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>scription rights plans,<span class=\"_ _1\"></span> as follows:<span class=\"_ _1a9\"> </span><table class=\"s w3a7 h69\" id=\"_4830f676-916e-42d2-9529-3aeaef3de84b\"><tr><td class=\"t m1 x34d h12 y6e5 ff3 fsb fc7 sc0 ls1b ws0\">CREA<span class=\"_ _1\"></span>TION DA<span class=\"_ _1\"></span>TE OF PLAN<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x521 h12 y6e6 ff3 fsb fc7 sc0 ls1b ws0\">DA<span class=\"_ _1\"></span>TE GRAN<span class=\"ls0\">-<span class=\"_ _1a9\"> </span></span></td><td class=\"t m1 x522 h12 y6e6 ff3 fsb fc7 sc0 ls1b ws0\">EXERCISE PRICE </td><td class=\"t m1 x523 h12 y6e5 ff3 fsb fc7 sc0 ls1b wsbe\">BENEFICIARY<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td class=\"t m1 x524 h12 y6e7 ff3 fsb fc7 sc0 ls1b wsbe\">TED<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x525 h12 y6e7 ff3 fsb fc7 sc0 ls1b ws0\">(IN EURO)<span class=\"_ _1a9\"> </span></td><td></td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x526 h13 y6e8 ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees,<span class=\"_ _4\"></span> key </td></tr><tr><td class=\"c n xf0 y6e9 w3a8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws259\">Subscription Rights Plan 2017<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x527 y6e9 w3a9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2017-2020</div></td><td class=\"t m2 x522 h13 y6ea ff1 fsc fc7 sc0 ls0 ws0\">Between 2.64 </td><td class=\"t m2 x528 h13 y6ea ff1 fsc fc7 sc0 ls0 ws0\">consultants and </td></tr><tr><td></td><td></td><td class=\"t m2 x529 h13 y6eb ff1 fsc fc7 sc0 ls0 ws0\">and 6<span class=\"_ _4\"></span>.55<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x526 h13 y6eb ff1 fsc fc7 sc0 ls0 ws0\">directors of the </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x3ea h13 y6ec ff1 fsc fc7 sc0 ls0 ws0\">Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6ed ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td></td><td class=\"t m2 x52a h13 y6ee ff1 fsc fc7 sc0 ls0 ws0\">Non-Executive </td></tr><tr><td class=\"t m2 x34d h13 y6ef ff1 fsc fc7 sc0 ls0 ws0\">2020<span class=\"_ _1a9\"> </span></td><td class=\"c n x52b y6f0 w3aa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x52c y6f0 w3ab h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.57</div></td><td class=\"t m2 x526 h13 y6f1 ff1 fsc fc7 sc0 ls0 ws0\">Directors of the </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x3ea h13 y6f2 ff1 fsc fc7 sc0 ls0 ws0\">Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6f3 ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td class=\"t m2 x3ed h13 y6f3 ff1 fsc fc7 sc0 ls0 ws0\">Between 1<span class=\"_ _4\"></span>.75 </td><td class=\"t m2 x526 h13 y6f4 ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees and </td></tr><tr><td class=\"t m2 x34d h13 y6f5 ff1 fsc fc7 sc0 ls0 ws0\">2021-1<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x52d h13 y6f6 ff1 fsc fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x529 h13 y6f5 ff1 fsc fc7 sc0 ls0 ws0\">and 2.60<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x528 h13 y6f6 ff1 fsc fc7 sc0 ls0 ws0\">key consultants </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x52e h13 y6f7 ff1 fsc fc7 sc0 ls0 ws0\">of the Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6f8 ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td></td><td class=\"t m2 x526 h13 y6f9 ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees and </td></tr><tr><td class=\"t m2 x34d h13 y6fa ff1 fsc fc7 sc0 ls0 ws0\">2021-2<span class=\"_ _1a9\"> </span></td><td class=\"c n x52b y6fb w3aa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x52f y6fb w3ac h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>.75</div></td><td class=\"t m2 x528 h13 y6fc ff1 fsc fc7 sc0 ls0 ws0\">key consultants </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x52e h13 y6fd ff1 fsc fc7 sc0 ls0 ws0\">of the Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6fe ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td class=\"t m2 x3e8 h13 y6fe ff1 fsc fc7 sc0 ls0 ws0\">Between 0<span class=\"_ _1\"></span>.444 </td><td class=\"t m2 x526 h13 y6ff ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees and </td></tr><tr><td class=\"t m2 x34d h13 y700 ff1 fsc fc7 sc0 ls0 ws0\">2021-3<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x530 h13 y701 ff1 fsc fc7 sc0 ls0 ws0\">2021-2022<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x525 h13 y700 ff1 fsc fc7 sc0 ls0 ws0\">and 1<span class=\"_ _4\"></span>.82<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x528 h13 y701 ff1 fsc fc7 sc0 ls0 ws0\">key consultants </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x52e h13 y702 ff1 fsc fc7 sc0 ls0 ws0\">of the Group<span class=\"_ _1a9\"> </span></td></tr></table>Brief overview of all outstanding subscription rights granted between 2017<span class=\"_ _1\"></span> and December 31<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022<span class=\"_ _1a9\"> </span><div class=\"t m0 ha ff2 fs5 fc0 sc0 ls0 ws0 gs1cf\">107<span class=\"_ _1a9\"> </span></div><div class=\"t m0 hb ff6 fs6 fc5 sc0 lsa wse gsb6\">OXURION<span class=\"ff7 ws0\"> ANNU<span class=\"_ _4\"></span>AL REPORT 2022<span class=\"_ _1a9\"> </span></span></div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs1d0\">Subscription Rights Plan 2017<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws172 gsb9\">On November 20<span class=\"_ _25\"></span>, 2017<span class=\"_ _0\"></span>,<span class=\"_ _4\"></span> the EGM of Oxurion decided to<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws63 gsba\">issue the Subscription Rights Plan 2017<span class=\"_ _4\"></span> (formerl<span class=\"_ _4\"></span>y referr<span class=\"_ _4\"></span>ed<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1f5 gsbb\">to as the warr<span class=\"_ _4\"></span>ants plan 2017)<span class=\"_ _1\"></span>. Under this Subscription<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws50 gsbc\">Rights Plan 2017<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> which has a term of ten years and all<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsdd gs1d1\">will lapse in 2027<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> a maximum of 1,440<span class=\"_ _25\"></span>,000 subscription<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsf9 gsbd\">rights can be issued and granted to emplo<span class=\"_ _4\"></span>yees<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> dir<span class=\"_ _4\"></span>ectors,<span class=\"_ _1\"></span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws3e gsbe\">and consultants of the Group<span class=\"_ _4\"></span>. Eac<span class=\"_ _4\"></span>h subscription right<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsbf\">entitles the holder to subscribe to one Oxurion share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws188 gsc1\">Subscription rights are granted under this p<span class=\"_ _4\"></span>lan by the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws13a gsc2\">Board of Directors or the Nomination and Rem<span class=\"_ _4\"></span>uneration<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsea gs1d2\">Committee,<span class=\"_ _1\"></span> except for directors<span class=\"_ _4\"></span>. Authority to grant sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb4 gsc3\">scription rights to directors is held b<span class=\"_ _4\"></span>y the general meeting<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1c5 gsc4\">of shareholders<span class=\"_ _4\"></span>. Subscription rights are off<span class=\"_ _4\"></span>ered free of<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws78 gsc5\">charge<span class=\"_ _4\"></span>. The exercise price is equal to the lo<span class=\"_ _4\"></span>w<span class=\"_ _4\"></span>er of (i) the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws119 gsc6\">average of the c<span class=\"_ _4\"></span>losing prices of the share on the stoc<span class=\"_ _4\"></span>k<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsdd gsc7\">market during the 30 days prior to the offering of a sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws24 gsc8\">scription right or (ii) the closing price on the last stock<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wse7 gs1d3\">market day prior to the offer<span class=\"_ _1\"></span>. Subscription rights granted<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws17a gsc9\">under this plan have a thr<span class=\"_ _4\"></span>ee year gr<span class=\"_ _4\"></span>aded vesting (50%<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws14b gsca\">after 2 years and 50% after 3 y<span class=\"_ _4\"></span>ears) with no performance<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1b gscb\">conditions. T<span class=\"_ _4\"></span>he conditions under which a subscription right<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws167 gscc\">holder is entitled to exercise a subscription right are estab<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gs1d4\">lished by the Nomination and Remuner<span class=\"_ _4\"></span>ation Committee.<span class=\"_ _1a9\"> </span> </div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs1d5\">Subscription Rights Plan 2020<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsbb gsd0\">On December 23<span class=\"_ _1\"></span>, 2020<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> the Board of Directors pr<span class=\"_ _4\"></span>oposed<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsdc gsd1\">to issue the Oxurion 2020 Subscription Rights Plan,<span class=\"_ _4\"></span> which<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws108 gsd2\">was decided b<span class=\"_ _4\"></span>y the A<span class=\"_ _4\"></span>GM held in May 2019<span class=\"_ _1\"></span>. Under this<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsda gsd3\">Subscription Rights Plan 2020<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> which has a term of ten<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1fd gsd4\">years and all subscription rights will lapse in 2030<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> a<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws9d gsd5\">maximum of 150<span class=\"_ _1\"></span>,000 subscription rights can be issued<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws38 gsd6\">and granted to Non-Executive Director<span class=\"_ _4\"></span>s of Oxurion. Each<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsda gsd7\">subscription right entitles the holder to subscribe to one<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws26 gsd8\">Oxurion share subject to the payment of the exercise price<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws8b gsdd\">The exercise price is equal to the lo<span class=\"_ _4\"></span>wer of (i) the a<span class=\"_ _4\"></span>verage<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws2b gs1d6\">of the closing prices of a share on the stoc<span class=\"_ _4\"></span>k market during<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws59 gs1d7\">the 30 days prior to the offering of a subscription right or<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws96 gs1d8\">(ii) the closing price on the last stock market day prior to<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws80 gsdf\">the offer<span class=\"_ _1\"></span>. Subscription rights granted under this plan ha<span class=\"_ _4\"></span>ve a<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gse0\">contractual term of ten y<span class=\"_ _4\"></span>ears and vest immediately<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m0 h25 ff9 fs3 fc7 sc0 ls0 ws0 gs1d9\">Subscription Rights Plans 2021<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws20f gse4\">On April 14<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2021,<span class=\"_ _1\"></span> the Board of Directors of Oxurion<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws25a gse5\">decided to issue the Subscription Rights Plan 2021-1<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws46 gse6\">Under this Subscription Rights Plan 2021-1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> which has a<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws1aa gs1da\">term of ten years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and all subscription rights will lapse in<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsac gs1db\">2031<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> a maximum of 1<span class=\"_ _1\"></span>.085 million subscription rights can<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws88 gs1dc\">be issued and granted to emplo<span class=\"_ _4\"></span>yees i and consultants of<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws179 gse8\">the Group<span class=\"_ _4\"></span>. Eac<span class=\"_ _4\"></span>h subscription right entitles the holder to<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gse9\">subscribe to one Oxurion share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsc5 gseb\">On September 22,<span class=\"_ _4\"></span> 2021<span class=\"_ _1\"></span>, the Boar<span class=\"_ _4\"></span>d of Directors of Oxurion<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb3 gsec\">has decided to issue the Subscription Rights Plan 2021-2.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws17c gsed\">Under this Subscription Rights Plan 2021-2,<span class=\"_ _4\"></span> which has<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws3f gs1dd\">a term of ten years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and all subscription rights will lapse<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws18c gsee\">in 2031<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> a maximum of 550<span class=\"_ _1\"></span>,000 subscription rights can<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws8c gsef\">be issued and granted to emplo<span class=\"_ _4\"></span>yees and consultants of<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws179 gs1de\">the Group<span class=\"_ _4\"></span>. Eac<span class=\"_ _4\"></span>h subscription right entitles the holder to<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsf0\">subscribe to one Oxurion share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws187 gsf2\">On December 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _1\"></span>, the Boar<span class=\"_ _4\"></span>d of Directors of Oxurion<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsb4 gsf3\">has decided to issue the Subscription Rights Plan 2021-3<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws172 gsf4\">Under this Subscription Rights Plan 2021-3<span class=\"_ _1\"></span>, whic<span class=\"_ _4\"></span>h has a<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsdc gsf5\">term of ten years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and all will lapse in 203<span class=\"_ _4\"></span>1<span class=\"_ _1\"></span>, a maximum of<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws199 gs1df\">862,000 subscription rights can be issued and granted to<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa4 gsf6\">emplo<span class=\"_ _4\"></span>yees and consultants of the Group<span class=\"_ _1\"></span>. Each subscrip<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws13a gsf7\">tion right entitles the holder to subscribe to one Oxurion<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsc9 gsf8\">share<span class=\"_ _4\"></span>.  These plans ar<span class=\"_ _4\"></span>e collectively r<span class=\"_ _4\"></span>eferred to as the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws0 gsf9\">Subscription Rights Plans 2021<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wseb gsfa\">Subscription rights are granted under the Subscription<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsed gsfb\">Rights Plans 2021 by the Board of Dir<span class=\"_ _4\"></span>ectors or the<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 ws40 gsfc\">Nomination and Remuneration Committee<span class=\"_ _4\"></span>. Subscription<span class=\"_ _1a9\"> </span> </div><div class=\"t m1 he ff1 fs9 fc7 sc0 ls0 wsa7 gsfd\">rights are offer<span class=\"_ _4\"></span>ed free of charge<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he exercise price is<span class=\"_ _1a9\"> </span> </div>2020 SUBSCRIPTION PLAN<span class=\"_ _b6\"> </span><span class=\"wsbe\">ASSUMPTIONS<span class=\"_ _1a9\"> </span></span>GRANT DA<span class=\"_ _1\"></span>TE<span class=\"_ _1c\"> </span>MAR 21<span class=\"_ _1a9\"> </span>Number of warrants gr<span class=\"_ _4\"></span>anted<span class=\"_ _9e\"> </span>75<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span>Current share price on grant date (in euro)<span class=\"_ _1a9\"> </span>2.55<span class=\"_ _1a9\"> </span>Exercise price<span class=\"_ _17a\"> </span>2.57<span class=\"_ _1a9\"> </span>Expected dividend yield<span class=\"_ _17b\"> </span>-<span class=\"_ _1a9\"> </span>Expected stock price volatility<span class=\"_ _9\"> </span>45%<span class=\"_ _1a9\"> </span>Risk<span class=\"_ _4\"></span>-free interest r<span class=\"_ _4\"></span>ate<span class=\"_ _10b\"> </span>-0.16%<span class=\"_ _1a9\"> </span>Expected duration<span class=\"_ _113\"> </span>9<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>air value<span class=\"_ _97\"> </span>1<span class=\"_ _4\"></span>.23<span class=\"_ _1a9\"> </span>The assumptions used in determining the fair value of the subscription rights gr<span class=\"_ _4\"></span>anted are based on the follo<span class=\"_ _4\"></span>wing data: \u2022 <span class=\"_ _62\"> </span><span class=\"ws6e\">Current share price on grant date \u2013 the c<span class=\"_ _4\"></span>losing price </span>on the stock market of Euronext Brussels<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws58\">Expected stock price volatility \u2013 the historical volatility </span>of Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s share price.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws25d\">Expected duration \u2013 calculated as the estimated </span><table class=\"s w3c4 h6b\" id=\"_520e5b8c-0cd4-4774-8e2e-f3f3b3713294\"><tr><td class=\"t m1 x552 he y716 ff1 fs9 fc7 sc0 ls0 ws75\">duration until exercise<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> taking into account the specific </td></tr><tr><td class=\"t m1 x552 he y717 ff1 fs9 fc7 sc0 ls0 ws0\">features of the p<span class=\"_ _4\"></span>lans.<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m1 x553 he y718 ff1 fs9 fc7 sc0 ls0 ws0\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws31\">Risk<span class=\"_ _4\"></span>-free inter<span class=\"_ _4\"></span>est rate \u2013 based on the Belgian go<span class=\"_ _4\"></span>vern<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></span></td></tr><tr><td class=\"t m1 x552 he y719 ff1 fs9 fc7 sc0 ls0 ws39\">ment bond rates at the date of granting with a term </td></tr><tr><td class=\"t m1 x552 he y71a ff1 fs9 fc7 sc0 ls0 ws0\">equal to the expected life of the subscription rights<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></td></tr></table>Movements in the number of subscription rights outstand<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ing and their related w<span class=\"_ _4\"></span>eighted average exercise prices ar<span class=\"_ _4\"></span>e as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span><table class=\"s w20d h6c\" id=\"_7c714e05-b03c-4d67-997b-b6b9644ab0c0\"><tr><td></td><td class=\"c n x554 y71b w61 h41\" colspan=\"2\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x555 y71b w62 h41\" colspan=\"2\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td></td><td class=\"t m1 x556 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">A<span class=\"_ _4\"></span>VERA<span class=\"_ _4\"></span>GE </td><td class=\"t m1 x3a2 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">SUB-<span class=\"ls0 ws0\"> </span></td><td class=\"t m1 x557 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">A<span class=\"_ _4\"></span>VERA<span class=\"_ _4\"></span>GE </td><td class=\"t m1 x558 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">SUB-<span class=\"ls0 ws0\"> </span></td></tr><tr><td></td><td class=\"t m1 x556 h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">EXERCISE </td><td class=\"t m1 x50a h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">SCRIPTION <span class=\"_ _0\"></span><span class=\"ls0 ws0\"> </span></td><td class=\"t m1 x557 h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">EXERCISE </td><td class=\"t m1 x559 h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">SCRIPTION <span class=\"_ _0\"></span><span class=\"ls0 ws0\"> </span></td></tr><tr><td></td><td class=\"t m1 x55a h12 y71e ff3 fsb fc7 sc0 ls1b ws0\">PRICE IN EUR<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x55b h12 y71e ff3 fsb fc7 sc0 ls1b wsbe\">RIGHTS<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x401 h12 y71e ff3 fsb fc7 sc0 ls1b ws0\">PRICE IN EUR<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x55c h12 y71e ff3 fsb fc7 sc0 ls1b wsbe\">RIGHTS<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y71f w3c5 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">As at 1 January<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x55d y71f w3c6 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">2.52<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x55e y71f w3c7 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,131<span class=\"_ _4\"></span>,250<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x55f y71f w3c8 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>.84<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x560 y71f w3c9 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">893,800<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y720 w3ca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Granted<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> accepted<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x561 y720 w3cb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.44<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x562 y720 wca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,000<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x563 y720 w3cc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.11<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x564 y720 w3cd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,431,000<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y721 w3ce h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>orfeited<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x565 y721 w3cf h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.46<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x566 y721 w3d0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-172,970<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x567 y721 w3d1 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3.30<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x568 y721 w3d2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-193<span class=\"_ _4\"></span>,550<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y722 w3d3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Exercised<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x569 y722 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56a y722 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56b y722 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56c y722 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w3d4 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">As at 31 December<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56d y515 w3d5 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2.54<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56e y515 w3d6 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2,959<span class=\"_ _4\"></span>,280<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56f y515 w3d7 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2.52<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x570 y515 w3d8 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">3<span class=\"_ _1\"></span>,131,250<span class=\"_ _1a9\"> </span></div></td></tr></table>Outstanding vested subscription rights at December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> have the f<span class=\"_ _4\"></span>ollowing ear<span class=\"_ _4\"></span>liest exercise date,<span class=\"_ _1\"></span> maturities and exercise prices:<span class=\"_ _1a9\"> </span>EARLIEST EXERCISE D<span class=\"_ _3\"></span>AT<span class=\"_ _5\"> </span>E<span class=\"_ _1a9\"> </span>EXPIRY DA<span class=\"_ _1\"></span>TE<span class=\"_ _1a9\"> </span>EXERCISE PRICE (IN EURO)<span class=\"_ _1a9\"> </span>NUMBER (THOUSANDS)<span class=\"_ _1a9\"> </span>2023<span class=\"_ _11e\"> </span>2027<span class=\"_ _9\"> </span>3<span class=\"_ _4\"></span>.95<span class=\"_ _91\"> </span>692<span class=\"_ _1a9\"> </span>2023<span class=\"_ _179\"> </span>2030<span class=\"_ _91\"> </span>2.57<span class=\"_ _84\"> </span>60<span class=\"_ _1a9\"> </span>2023<span class=\"_ _117\"> </span>203<span class=\"_ _4\"></span>1<span class=\"_ _94\"> </span>2.23<span class=\"_ _fe\"> </span>1,171<span class=\"_ _1a9\"> </span>T<span class=\"_ _1\"></span>otal weighted average<span class=\"_ _1a9\"> </span>2.86<span class=\"_ _80\"> </span>1<span class=\"_ _4\"></span>,923<span class=\"_ _1a9\"> </span>(VW<span class=\"_ _1\"></span>AP) of the Company\u2019<span class=\"_ _25\"></span>s shares on the stock exchange over a period of thirty calendar days prior to the date of the offer or (ii) the closing price of the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s shares on the last business day prior to the date of the offer<span class=\"_ _1\"></span>. In general,<span class=\"_ _4\"></span> half of the subscription rights under these p<span class=\"_ _4\"></span>lans vest after one year and the other half vest quarterly over the follo<span class=\"_ _4\"></span>wing two y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or the subscription rights granted in April 2021 under the Subscription Rights Plan 2021-1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the vesting period exceptionally commenced on December 28<span class=\"_ _1\"></span>, 2020<span class=\"_ _25\"></span>. The conditions under which a subscription rights holder is entitled to exercise a subscription right are estab<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lished by the Nomination and Remuner<span class=\"_ _4\"></span>ation Committee. The grant date f<span class=\"_ _4\"></span>air values of the subscription rights granted under the different Subscription Plans ha<span class=\"_ _4\"></span>ve been deter<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mined by using the Blac<span class=\"_ _4\"></span>k &amp; Scholes model,<span class=\"_ _4\"></span> taking into account the follo<span class=\"_ _4\"></span>wing assumptions:<span class=\"_ _1a9\"> </span>2017 SUBSCRIPTION PLAN<span class=\"_ _175\"> </span><span class=\"wsbe\">ASSUMPTIONS<span class=\"_ _1a9\"> </span></span>GRANT DA<span class=\"_ _1\"></span>TE<span class=\"_ _176\"> </span>DEC 17<span class=\"_ _6\"> </span>DEC 17<span class=\"_ _6\"> </span>JUN 18<span class=\"_ _1f\"> </span>DEC 18<span class=\"_ _1f\"> </span>DEC 18<span class=\"_ _2\"> </span>JUL 19<span class=\"_ _1f\"> </span>DEC 19<span class=\"_ _1f\"> </span>DEC 19<span class=\"_ _b\"> </span>JUN 20<span class=\"_ _177\"> </span>AUG 20<span class=\"_ _1a9\"> </span>Number of warrants gr<span class=\"_ _4\"></span>anted<span class=\"_ _12\"> </span>251<span class=\"_ _4\"></span>,000<span class=\"_ _67\"> </span>150<span class=\"_ _4\"></span>,000<span class=\"_ _12\"> </span>33<span class=\"_ _4\"></span>,500<span class=\"_ _5a\"> </span>208,000<span class=\"_ _67\"> </span>150<span class=\"_ _4\"></span>,000<span class=\"_ _12\"> </span>44,300<span class=\"_ _65\"> </span>136<span class=\"_ _4\"></span>,000<span class=\"_ _65\"> </span>125,000<span class=\"_ _12\"> </span>43<span class=\"_ _4\"></span>,500<span class=\"_ _b1\"> </span>10<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span>Current share price on grant date (in euro)<span class=\"_ _1a9\"> </span>3<span class=\"_ _4\"></span>.38<span class=\"_ _35\"> </span>3<span class=\"_ _1\"></span>.38<span class=\"_ _56\"> </span>7<span class=\"_ _1\"></span>.07<span class=\"_ _35\"> </span>3<span class=\"_ _4\"></span>.52<span class=\"_ _45\"> </span>3.52<span class=\"_ _32\"> </span>4.65<span class=\"_ _5d\"> </span>2.875<span class=\"_ _b\"> </span>2.875<span class=\"_ _35\"> </span>3.07<span class=\"_ _45\"> </span>2.72<span class=\"_ _1a9\"> </span>Exercise price<span class=\"_ _2c\"> </span>3<span class=\"_ _4\"></span>.38<span class=\"_ _5d\"> </span>4<span class=\"_ _4\"></span>.593<span class=\"_ _5d\"> </span>6<span class=\"_ _1\"></span>.549<span class=\"_ _e2\"> </span><span class=\"ls3e ws222\">3.4<span class=\"_ _b\"> </span></span>4.593<span class=\"_ _5d\"> </span>3.822<span class=\"_ _32\"> </span>2.64<span class=\"_ _5d\"> </span>4.593<span class=\"_ _b\"> </span>2.847<span class=\"_ _73\"> </span>2.8<span class=\"_ _1a9\"> </span>Expected dividend yield<span class=\"_ _116\"> </span>-<span class=\"_ _105\"> </span>-<span class=\"_ _103\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _103\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _1a9\"> </span>Expected stock price volatility<span class=\"_ _48\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _7d\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _2\"> </span>60%<span class=\"_ _7d\"> </span>60%<span class=\"_ _7d\"> </span>60%<span class=\"_ _2\"> </span>60%<span class=\"_ _1a9\"> </span>Risk<span class=\"_ _4\"></span>-free interest r<span class=\"_ _4\"></span>ate<span class=\"_ _28\"> </span>0<span class=\"_ _4\"></span>.59%<span class=\"_ _1b\"> </span>0<span class=\"_ _4\"></span>.59%<span class=\"_ _177\"> </span>0<span class=\"_ _4\"></span>.73%<span class=\"_ _1b\"> </span>0<span class=\"_ _4\"></span>.69%<span class=\"_ _f\"> </span>0.69%<span class=\"_ _b1\"> </span>-0.25%<span class=\"_ _f\"> </span>-0<span class=\"_ _1\"></span>.12%<span class=\"_ _1b\"> </span>-0<span class=\"_ _4\"></span>.12%<span class=\"_ _7e\"> </span>-0<span class=\"_ _4\"></span>.23%<span class=\"_ _7e\"> </span>-0<span class=\"_ _1\"></span>.38%<span class=\"_ _1a9\"> </span>Expected duration<span class=\"_ _55\"> </span>10<span class=\"_ _13\"> </span>10<span class=\"_ _3a\"> </span><span class=\"ls52 ws25b\">9.<span class=\"_ _23\"></span>5<span class=\"_ _2b\"> </span></span>9<span class=\"_ _101\"> </span>9<span class=\"_ _79\"> </span><span class=\"ls3e ws222\">8.<span class=\"_ _3\"></span>5<span class=\"_ _53\"> </span></span>8<span class=\"_ _82\"> </span>8<span class=\"_ _38\"> </span><span class=\"ls53 ws25c\">7.<span class=\"_ _23\"></span>5<span class=\"_ _36\"> </span>7.<span class=\"_ _23\"></span>5<span class=\"_ _1a9\"> </span></span>F<span class=\"_ _4\"></span>air value<span class=\"_ _118\"> </span>1<span class=\"_ _4\"></span>.56<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.29<span class=\"_ _35\"> </span>3<span class=\"_ _4\"></span>.33<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.58<span class=\"_ _36\"> </span><span class=\"ls4d ws252\">1.3<span class=\"_ _35\"> </span></span>2.23<span class=\"_ _74\"> </span>1.75<span class=\"_ _56\"> </span>1.43<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.83<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.56<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfReservesAndOtherEquityInterestExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-107": {
   "value": "Share-based payment plans<span class=\"_ _1a9\"> </span>The Group has cr<span class=\"_ _4\"></span>eated various subscription rights plans that can be granted to personnel and a subscription rights plan for Non-Executive Dir<span class=\"_ _4\"></span>ectors. Since the public listing,<span class=\"_ _4\"></span> all subscription rights p<span class=\"_ _4\"></span>lans have been created in respect of Oxurion.<span class=\"_ _1a9\"> </span>At December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022,<span class=\"_ _4\"></span> there are five outstanding sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>scription rights plans,<span class=\"_ _1\"></span> as follows:<span class=\"_ _1a9\"> </span><table class=\"s w3a7 h69\" id=\"_4830f676-916e-42d2-9529-3aeaef3de84b\"><tr><td class=\"t m1 x34d h12 y6e5 ff3 fsb fc7 sc0 ls1b ws0\">CREA<span class=\"_ _1\"></span>TION DA<span class=\"_ _1\"></span>TE OF PLAN<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x521 h12 y6e6 ff3 fsb fc7 sc0 ls1b ws0\">DA<span class=\"_ _1\"></span>TE GRAN<span class=\"ls0\">-<span class=\"_ _1a9\"> </span></span></td><td class=\"t m1 x522 h12 y6e6 ff3 fsb fc7 sc0 ls1b ws0\">EXERCISE PRICE </td><td class=\"t m1 x523 h12 y6e5 ff3 fsb fc7 sc0 ls1b wsbe\">BENEFICIARY<span class=\"_ _1a9\"> </span></td></tr><tr><td></td><td class=\"t m1 x524 h12 y6e7 ff3 fsb fc7 sc0 ls1b wsbe\">TED<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x525 h12 y6e7 ff3 fsb fc7 sc0 ls1b ws0\">(IN EURO)<span class=\"_ _1a9\"> </span></td><td></td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x526 h13 y6e8 ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees,<span class=\"_ _4\"></span> key </td></tr><tr><td class=\"c n xf0 y6e9 w3a8 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws259\">Subscription Rights Plan 2017<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x527 y6e9 w3a9 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2017-2020</div></td><td class=\"t m2 x522 h13 y6ea ff1 fsc fc7 sc0 ls0 ws0\">Between 2.64 </td><td class=\"t m2 x528 h13 y6ea ff1 fsc fc7 sc0 ls0 ws0\">consultants and </td></tr><tr><td></td><td></td><td class=\"t m2 x529 h13 y6eb ff1 fsc fc7 sc0 ls0 ws0\">and 6<span class=\"_ _4\"></span>.55<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x526 h13 y6eb ff1 fsc fc7 sc0 ls0 ws0\">directors of the </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x3ea h13 y6ec ff1 fsc fc7 sc0 ls0 ws0\">Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6ed ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td></td><td class=\"t m2 x52a h13 y6ee ff1 fsc fc7 sc0 ls0 ws0\">Non-Executive </td></tr><tr><td class=\"t m2 x34d h13 y6ef ff1 fsc fc7 sc0 ls0 ws0\">2020<span class=\"_ _1a9\"> </span></td><td class=\"c n x52b y6f0 w3aa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x52c y6f0 w3ab h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.57</div></td><td class=\"t m2 x526 h13 y6f1 ff1 fsc fc7 sc0 ls0 ws0\">Directors of the </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x3ea h13 y6f2 ff1 fsc fc7 sc0 ls0 ws0\">Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6f3 ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td class=\"t m2 x3ed h13 y6f3 ff1 fsc fc7 sc0 ls0 ws0\">Between 1<span class=\"_ _4\"></span>.75 </td><td class=\"t m2 x526 h13 y6f4 ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees and </td></tr><tr><td class=\"t m2 x34d h13 y6f5 ff1 fsc fc7 sc0 ls0 ws0\">2021-1<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x52d h13 y6f6 ff1 fsc fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x529 h13 y6f5 ff1 fsc fc7 sc0 ls0 ws0\">and 2.60<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x528 h13 y6f6 ff1 fsc fc7 sc0 ls0 ws0\">key consultants </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x52e h13 y6f7 ff1 fsc fc7 sc0 ls0 ws0\">of the Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6f8 ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td></td><td class=\"t m2 x526 h13 y6f9 ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees and </td></tr><tr><td class=\"t m2 x34d h13 y6fa ff1 fsc fc7 sc0 ls0 ws0\">2021-2<span class=\"_ _1a9\"> </span></td><td class=\"c n x52b y6fb w3aa h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2021<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x52f y6fb w3ac h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1<span class=\"_ _4\"></span>.75</div></td><td class=\"t m2 x528 h13 y6fc ff1 fsc fc7 sc0 ls0 ws0\">key consultants </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x52e h13 y6fd ff1 fsc fc7 sc0 ls0 ws0\">of the Group<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m2 x34d h13 y6fe ff1 fsc fc7 sc0 ls0 ws0\">Subscription Rights Plan </td><td></td><td class=\"t m2 x3e8 h13 y6fe ff1 fsc fc7 sc0 ls0 ws0\">Between 0<span class=\"_ _1\"></span>.444 </td><td class=\"t m2 x526 h13 y6ff ff1 fsc fc7 sc0 ls0 ws0\">Employ<span class=\"_ _4\"></span>ees and </td></tr><tr><td class=\"t m2 x34d h13 y700 ff1 fsc fc7 sc0 ls0 ws0\">2021-3<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x530 h13 y701 ff1 fsc fc7 sc0 ls0 ws0\">2021-2022<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x525 h13 y700 ff1 fsc fc7 sc0 ls0 ws0\">and 1<span class=\"_ _4\"></span>.82<span class=\"_ _1a9\"> </span></td><td class=\"t m2 x528 h13 y701 ff1 fsc fc7 sc0 ls0 ws0\">key consultants </td></tr><tr><td></td><td></td><td></td><td class=\"t m2 x52e h13 y702 ff1 fsc fc7 sc0 ls0 ws0\">of the Group<span class=\"_ _1a9\"> </span></td></tr></table>Brief overview of all outstanding subscription rights granted between 2017<span class=\"_ _1\"></span> and December 31<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>Subscription Rights Plan 2017<span class=\"_ _1a9\"> </span>n November 20<span class=\"_ _25\"></span>, 2017<span class=\"_ _0\"></span>,<span class=\"_ _4\"></span> the EGM of Oxurion decided to<span class=\"_ _1a9\"> </span>sue the Subscription Rights Plan 2017<span class=\"_ _4\"></span> (formerl<span class=\"_ _4\"></span>y referr<span class=\"_ _4\"></span>ed<span class=\"_ _1a9\"> </span> as the warr<span class=\"_ _4\"></span>ants plan 2017)<span class=\"_ _1\"></span>. Under this Subscription<span class=\"_ _1a9\"> </span>ghts Plan 2017<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> which has a term of ten years and all<span class=\"_ _1a9\"> </span>ll lapse in 2027<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> a maximum of 1,440<span class=\"_ _25\"></span>,000 subscription<span class=\"_ _1a9\"> </span>ghts can be issued and granted to emplo<span class=\"_ _4\"></span>yees<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> dir<span class=\"_ _4\"></span>ectors,<span class=\"_ _1\"></span> nd consultants of the Group<span class=\"_ _4\"></span>. Eac<span class=\"_ _4\"></span>h subscription right<span class=\"_ _1a9\"> </span>ntitles the holder to subscribe to one Oxurion share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>ubscription rights are granted under this p<span class=\"_ _4\"></span>lan by the<span class=\"_ _1a9\"> </span>oard of Directors or the Nomination and Rem<span class=\"_ _4\"></span>uneration<span class=\"_ _1a9\"> </span>ommittee,<span class=\"_ _1\"></span> except for directors<span class=\"_ _4\"></span>. Authority to grant sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cription rights to directors is held b<span class=\"_ _4\"></span>y the general meeting<span class=\"_ _1a9\"> </span> shareholders<span class=\"_ _4\"></span>. Subscription rights are off<span class=\"_ _4\"></span>ered free of<span class=\"_ _1a9\"> </span>harge<span class=\"_ _4\"></span>. The exercise price is equal to the lo<span class=\"_ _4\"></span>w<span class=\"_ _4\"></span>er of (i) the<span class=\"_ _1a9\"> </span>verage of the c<span class=\"_ _4\"></span>losing prices of the share on the stoc<span class=\"_ _4\"></span>k<span class=\"_ _1a9\"> </span>arket during the 30 days prior to the offering of a sub<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>cription right or (ii) the closing price on the last stock<span class=\"_ _1a9\"> </span>arket day prior to the offer<span class=\"_ _1\"></span>. Subscription rights granted<span class=\"_ _1a9\"> </span>nder this plan have a thr<span class=\"_ _4\"></span>ee year gr<span class=\"_ _4\"></span>aded vesting (50%<span class=\"_ _1a9\"> </span>ter 2 years and 50% after 3 y<span class=\"_ _4\"></span>ears) with no performance<span class=\"_ _1a9\"> </span>onditions. T<span class=\"_ _4\"></span>he conditions under which a subscription right<span class=\"_ _1a9\"> </span>older is entitled to exercise a subscription right are estab<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>hed by the Nomination and Remuner<span class=\"_ _4\"></span>ation Committee.<span class=\"_ _1a9\"> </span>Subscription Rights Plan 2020<span class=\"_ _1a9\"> </span>n December 23<span class=\"_ _1\"></span>, 2020<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> the Board of Directors pr<span class=\"_ _4\"></span>oposed<span class=\"_ _1a9\"> </span> issue the Oxurion 2020 Subscription Rights Plan,<span class=\"_ _4\"></span> which<span class=\"_ _1a9\"> </span>as decided b<span class=\"_ _4\"></span>y the A<span class=\"_ _4\"></span>GM held in May 2019<span class=\"_ _1\"></span>. Under this<span class=\"_ _1a9\"> </span>ubscription Rights Plan 2020<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> which has a term of ten<span class=\"_ _1a9\"> </span>ears and all subscription rights will lapse in 2030<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> a<span class=\"_ _1a9\"> </span>aximum of 150<span class=\"_ _1\"></span>,000 subscription rights can be issued<span class=\"_ _1a9\"> </span>nd granted to Non-Executive Director<span class=\"_ _4\"></span>s of Oxurion. Each<span class=\"_ _1a9\"> </span>ubscription right entitles the holder to subscribe to one<span class=\"_ _1a9\"> </span>xurion share subject to the payment of the exercise price<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The exercise price is equal to the lo<span class=\"_ _4\"></span>wer of (i) the a<span class=\"_ _4\"></span>verage<span class=\"_ _1a9\"> </span>of the closing prices of a share on the stoc<span class=\"_ _4\"></span>k market during<span class=\"_ _1a9\"> </span>the 30 days prior to the offering of a subscription right or<span class=\"_ _1a9\"> </span>(ii) the closing price on the last stock market day prior to<span class=\"_ _1a9\"> </span>the offer<span class=\"_ _1\"></span>. Subscription rights granted under this plan ha<span class=\"_ _4\"></span>ve a<span class=\"_ _1a9\"> </span>contractual term of ten y<span class=\"_ _4\"></span>ears and vest immediately<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>Subscription Rights Plans 2021<span class=\"_ _1a9\"> </span>On April 14<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2021,<span class=\"_ _1\"></span> the Board of Directors of Oxurion<span class=\"_ _1a9\"> </span>decided to issue the Subscription Rights Plan 2021-1<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Under this Subscription Rights Plan 2021-1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> which has a<span class=\"_ _1a9\"> </span>term of ten years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and all subscription rights will lapse in<span class=\"_ _1a9\"> </span>2031<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> a maximum of 1<span class=\"_ _1\"></span>.085 million subscription rights can<span class=\"_ _1a9\"> </span>be issued and granted to emplo<span class=\"_ _4\"></span>yees i and consultants of<span class=\"_ _1a9\"> </span>the Group<span class=\"_ _4\"></span>. Eac<span class=\"_ _4\"></span>h subscription right entitles the holder to<span class=\"_ _1a9\"> </span>subscribe to one Oxurion share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On September 22,<span class=\"_ _4\"></span> 2021<span class=\"_ _1\"></span>, the Boar<span class=\"_ _4\"></span>d of Directors of Oxurion<span class=\"_ _1a9\"> </span>has decided to issue the Subscription Rights Plan 2021-2.<span class=\"_ _1a9\"> </span>Under this Subscription Rights Plan 2021-2,<span class=\"_ _4\"></span> which has<span class=\"_ _1a9\"> </span>a term of ten years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and all subscription rights will lapse<span class=\"_ _1a9\"> </span>in 2031<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> a maximum of 550<span class=\"_ _1\"></span>,000 subscription rights can<span class=\"_ _1a9\"> </span>be issued and granted to emplo<span class=\"_ _4\"></span>yees and consultants of<span class=\"_ _1a9\"> </span>the Group<span class=\"_ _4\"></span>. Eac<span class=\"_ _4\"></span>h subscription right entitles the holder to<span class=\"_ _1a9\"> </span>subscribe to one Oxurion share<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>On December 30<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2021<span class=\"_ _1\"></span>, the Boar<span class=\"_ _4\"></span>d of Directors of Oxurion<span class=\"_ _1a9\"> </span>has decided to issue the Subscription Rights Plan 2021-3<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Under this Subscription Rights Plan 2021-3<span class=\"_ _1\"></span>, whic<span class=\"_ _4\"></span>h has a<span class=\"_ _1a9\"> </span>term of ten years<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and all will lapse in 203<span class=\"_ _4\"></span>1<span class=\"_ _1\"></span>, a maximum of<span class=\"_ _1a9\"> </span>862,000 subscription rights can be issued and granted to<span class=\"_ _1a9\"> </span>emplo<span class=\"_ _4\"></span>yees and consultants of the Group<span class=\"_ _1\"></span>. Each subscrip<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion right entitles the holder to subscribe to one Oxurion<span class=\"_ _1a9\"> </span>share<span class=\"_ _4\"></span>.  These plans ar<span class=\"_ _4\"></span>e collectively r<span class=\"_ _4\"></span>eferred to as the<span class=\"_ _1a9\"> </span>Subscription Rights Plans 2021<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Subscription rights are granted under the Subscription<span class=\"_ _1a9\"> </span>Rights Plans 2021 by the Board of Dir<span class=\"_ _4\"></span>ectors or the<span class=\"_ _1a9\"> </span>Nomination and Remuneration Committee<span class=\"_ _4\"></span>. Subscription<span class=\"_ _1a9\"> </span>rights are offer<span class=\"_ _4\"></span>ed free of charge<span class=\"_ _4\"></span>. T<span class=\"_ _4\"></span>he exercise price is<span class=\"_ _1a9\"> </span>equal to the low<span class=\"_ _4\"></span>er of (i) the volume weighted a<span class=\"_ _4\"></span>verage price<span class=\"_ _1a9\"> </span>2020 SUBSCRIPTION PLAN<span class=\"_ _b6\"> </span><span class=\"wsbe\">ASSUMPTIONS<span class=\"_ _1a9\"> </span></span>GRANT DA<span class=\"_ _1\"></span>TE<span class=\"_ _1c\"> </span>MAR 21<span class=\"_ _1a9\"> </span>Number of warrants gr<span class=\"_ _4\"></span>anted<span class=\"_ _9e\"> </span>75<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span>Current share price on grant date (in euro)<span class=\"_ _1a9\"> </span>2.55<span class=\"_ _1a9\"> </span>Exercise price<span class=\"_ _17a\"> </span>2.57<span class=\"_ _1a9\"> </span>Expected dividend yield<span class=\"_ _17b\"> </span>-<span class=\"_ _1a9\"> </span>Expected stock price volatility<span class=\"_ _9\"> </span>45%<span class=\"_ _1a9\"> </span>Risk<span class=\"_ _4\"></span>-free interest r<span class=\"_ _4\"></span>ate<span class=\"_ _10b\"> </span>-0.16%<span class=\"_ _1a9\"> </span>Expected duration<span class=\"_ _113\"> </span>9<span class=\"_ _1a9\"> </span>F<span class=\"_ _4\"></span>air value<span class=\"_ _97\"> </span>1<span class=\"_ _4\"></span>.23<span class=\"_ _1a9\"> </span>The assumptions used in determining the fair value of the subscription rights gr<span class=\"_ _4\"></span>anted are based on the follo<span class=\"_ _4\"></span>wing data: \u2022 <span class=\"_ _62\"> </span><span class=\"ws6e\">Current share price on grant date \u2013 the c<span class=\"_ _4\"></span>losing price </span>on the stock market of Euronext Brussels<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws58\">Expected stock price volatility \u2013 the historical volatility </span>of Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s share price.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws25d\">Expected duration \u2013 calculated as the estimated </span><table class=\"s w3c4 h6b\" id=\"_520e5b8c-0cd4-4774-8e2e-f3f3b3713294\"><tr><td class=\"t m1 x552 he y716 ff1 fs9 fc7 sc0 ls0 ws75\">duration until exercise<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> taking into account the specific </td></tr><tr><td class=\"t m1 x552 he y717 ff1 fs9 fc7 sc0 ls0 ws0\">features of the p<span class=\"_ _4\"></span>lans.<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"t m1 x553 he y718 ff1 fs9 fc7 sc0 ls0 ws0\">\u2022 <span class=\"_ _62\"> </span><span class=\"ws31\">Risk<span class=\"_ _4\"></span>-free inter<span class=\"_ _4\"></span>est rate \u2013 based on the Belgian go<span class=\"_ _4\"></span>vern<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></span></td></tr><tr><td class=\"t m1 x552 he y719 ff1 fs9 fc7 sc0 ls0 ws39\">ment bond rates at the date of granting with a term </td></tr><tr><td class=\"t m1 x552 he y71a ff1 fs9 fc7 sc0 ls0 ws0\">equal to the expected life of the subscription rights<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span></td></tr></table>Movements in the number of subscription rights outstand<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ing and their related w<span class=\"_ _4\"></span>eighted average exercise prices ar<span class=\"_ _4\"></span>e as follo<span class=\"_ _4\"></span>ws:<span class=\"_ _1a9\"> </span><table class=\"s w20d h6c\" id=\"_7c714e05-b03c-4d67-997b-b6b9644ab0c0\"><tr><td></td><td class=\"c n x554 y71b w61 h41\" colspan=\"2\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2022<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x555 y71b w62 h41\" colspan=\"2\"><div class=\"t m1 xca h12 y4f9 ff3 fsb fc7 sc0 ls1b wsbe\">2021<span class=\"_ _1a9\"> </span></div></td></tr><tr><td></td><td class=\"t m1 x556 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">A<span class=\"_ _4\"></span>VERA<span class=\"_ _4\"></span>GE </td><td class=\"t m1 x3a2 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">SUB-<span class=\"ls0 ws0\"> </span></td><td class=\"t m1 x557 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">A<span class=\"_ _4\"></span>VERA<span class=\"_ _4\"></span>GE </td><td class=\"t m1 x558 h12 y71c ff3 fsb fc7 sc0 ls1b wsbe\">SUB-<span class=\"ls0 ws0\"> </span></td></tr><tr><td></td><td class=\"t m1 x556 h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">EXERCISE </td><td class=\"t m1 x50a h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">SCRIPTION <span class=\"_ _0\"></span><span class=\"ls0 ws0\"> </span></td><td class=\"t m1 x557 h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">EXERCISE </td><td class=\"t m1 x559 h12 y71d ff3 fsb fc7 sc0 ls1b wsbe\">SCRIPTION <span class=\"_ _0\"></span><span class=\"ls0 ws0\"> </span></td></tr><tr><td></td><td class=\"t m1 x55a h12 y71e ff3 fsb fc7 sc0 ls1b ws0\">PRICE IN EUR<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x55b h12 y71e ff3 fsb fc7 sc0 ls1b wsbe\">RIGHTS<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x401 h12 y71e ff3 fsb fc7 sc0 ls1b ws0\">PRICE IN EUR<span class=\"_ _1a9\"> </span></td><td class=\"t m1 x55c h12 y71e ff3 fsb fc7 sc0 ls1b wsbe\">RIGHTS<span class=\"_ _1a9\"> </span></td></tr><tr><td class=\"c n xf0 y71f w3c5 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">As at 1 January<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x55d y71f w3c6 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">2.52<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x55e y71f w3c7 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>,131<span class=\"_ _4\"></span>,250<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x55f y71f w3c8 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">3<span class=\"_ _4\"></span>.84<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x560 y71f w3c9 h42\"><div class=\"t m0 xca h14 y51b ff2 fsd fc7 sc0 ls0 ws0\">893,800<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y720 w3ca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Granted<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> accepted<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x561 y720 w3cb h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.44<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x562 y720 wca h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">1,000<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x563 y720 w3cc h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.11<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x564 y720 w3cd h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2,431,000<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y721 w3ce h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">F<span class=\"_ _4\"></span>orfeited<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x565 y721 w3cf h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">2.46<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x566 y721 w3d0 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-172,970<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x567 y721 w3d1 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">3.30<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x568 y721 w3d2 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">-193<span class=\"_ _4\"></span>,550<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y722 w3d3 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">Exercised<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x569 y722 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56a y722 w87 h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56b y722 w37d h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _4\"></span>.00<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56c y722 w6a h42\"><div class=\"t m2 xca h13 y4fd ff1 fsc fc7 sc0 ls0 ws0\">0<span class=\"_ _1a9\"> </span></div></td></tr><tr><td class=\"c n xf0 y515 w3d4 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">As at 31 December<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56d y515 w3d5 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2.54<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56e y515 w3d6 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2,959<span class=\"_ _4\"></span>,280<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x56f y515 w3d7 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">2.52<span class=\"_ _1a9\"> </span></div></td><td class=\"c n x570 y515 w3d8 h43\"><div class=\"t m2 xca h1d y514 ff2 fsc fc7 sc0 ls0 ws0\">3<span class=\"_ _1\"></span>,131,250<span class=\"_ _1a9\"> </span></div></td></tr></table>Outstanding vested subscription rights at December 31<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _4\"></span> have the f<span class=\"_ _4\"></span>ollowing ear<span class=\"_ _4\"></span>liest exercise date,<span class=\"_ _1\"></span> maturities and exercise prices:<span class=\"_ _1a9\"> </span>EARLIEST EXERCISE D<span class=\"_ _3\"></span>AT<span class=\"_ _5\"> </span>E<span class=\"_ _1a9\"> </span>EXPIRY DA<span class=\"_ _1\"></span>TE<span class=\"_ _1a9\"> </span>EXERCISE PRICE (IN EURO)<span class=\"_ _1a9\"> </span>NUMBER (THOUSANDS)<span class=\"_ _1a9\"> </span>2023<span class=\"_ _11e\"> </span>2027<span class=\"_ _9\"> </span>3<span class=\"_ _4\"></span>.95<span class=\"_ _91\"> </span>692<span class=\"_ _1a9\"> </span>2023<span class=\"_ _179\"> </span>2030<span class=\"_ _91\"> </span>2.57<span class=\"_ _84\"> </span>60<span class=\"_ _1a9\"> </span>2023<span class=\"_ _117\"> </span>203<span class=\"_ _4\"></span>1<span class=\"_ _94\"> </span>2.23<span class=\"_ _fe\"> </span>1,171<span class=\"_ _1a9\"> </span>T<span class=\"_ _1\"></span>otal weighted average<span class=\"_ _1a9\"> </span>2.86<span class=\"_ _80\"> </span>1<span class=\"_ _4\"></span>,923<span class=\"_ _1a9\"> </span>(VW<span class=\"_ _1\"></span>AP) of the Company\u2019<span class=\"_ _25\"></span>s shares on the stock exchange over a period of thirty calendar days prior to the date of the offer or (ii) the closing price of the Compan<span class=\"_ _4\"></span>y\u2019<span class=\"_ _1\"></span>s shares on the last business day prior to the date of the offer<span class=\"_ _1\"></span>. In general,<span class=\"_ _4\"></span> half of the subscription rights under these p<span class=\"_ _4\"></span>lans vest after one year and the other half vest quarterly over the follo<span class=\"_ _4\"></span>wing two y<span class=\"_ _4\"></span>ears<span class=\"_ _4\"></span>. F<span class=\"_ _1\"></span>or the subscription rights granted in April 2021 under the Subscription Rights Plan 2021-1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> the vesting period exceptionally commenced on December 28<span class=\"_ _1\"></span>, 2020<span class=\"_ _25\"></span>. The conditions under which a subscription rights holder is entitled to exercise a subscription right are estab<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>lished by the Nomination and Remuner<span class=\"_ _4\"></span>ation Committee. The grant date f<span class=\"_ _4\"></span>air values of the subscription rights granted under the different Subscription Plans ha<span class=\"_ _4\"></span>ve been deter<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>mined by using the Blac<span class=\"_ _4\"></span>k &amp; Scholes model,<span class=\"_ _4\"></span> taking into account the follo<span class=\"_ _4\"></span>wing assumptions:<span class=\"_ _1a9\"> </span>2017 SUBSCRIPTION PLAN<span class=\"_ _175\"> </span><span class=\"wsbe\">ASSUMPTIONS<span class=\"_ _1a9\"> </span></span>GRANT DA<span class=\"_ _1\"></span>TE<span class=\"_ _176\"> </span>DEC 17<span class=\"_ _6\"> </span>DEC 17<span class=\"_ _6\"> </span>JUN 18<span class=\"_ _1f\"> </span>DEC 18<span class=\"_ _1f\"> </span>DEC 18<span class=\"_ _2\"> </span>JUL 19<span class=\"_ _1f\"> </span>DEC 19<span class=\"_ _1f\"> </span>DEC 19<span class=\"_ _b\"> </span>JUN 20<span class=\"_ _177\"> </span>AUG 20<span class=\"_ _1a9\"> </span>Number of warrants gr<span class=\"_ _4\"></span>anted<span class=\"_ _12\"> </span>251<span class=\"_ _4\"></span>,000<span class=\"_ _67\"> </span>150<span class=\"_ _4\"></span>,000<span class=\"_ _12\"> </span>33<span class=\"_ _4\"></span>,500<span class=\"_ _5a\"> </span>208,000<span class=\"_ _67\"> </span>150<span class=\"_ _4\"></span>,000<span class=\"_ _12\"> </span>44,300<span class=\"_ _65\"> </span>136<span class=\"_ _4\"></span>,000<span class=\"_ _65\"> </span>125,000<span class=\"_ _12\"> </span>43<span class=\"_ _4\"></span>,500<span class=\"_ _b1\"> </span>10<span class=\"_ _4\"></span>,000<span class=\"_ _1a9\"> </span>Current share price on grant date (in euro)<span class=\"_ _1a9\"> </span>3<span class=\"_ _4\"></span>.38<span class=\"_ _35\"> </span>3<span class=\"_ _1\"></span>.38<span class=\"_ _56\"> </span>7<span class=\"_ _1\"></span>.07<span class=\"_ _35\"> </span>3<span class=\"_ _4\"></span>.52<span class=\"_ _45\"> </span>3.52<span class=\"_ _32\"> </span>4.65<span class=\"_ _5d\"> </span>2.875<span class=\"_ _b\"> </span>2.875<span class=\"_ _35\"> </span>3.07<span class=\"_ _45\"> </span>2.72<span class=\"_ _1a9\"> </span>Exercise price<span class=\"_ _2c\"> </span>3<span class=\"_ _4\"></span>.38<span class=\"_ _5d\"> </span>4<span class=\"_ _4\"></span>.593<span class=\"_ _5d\"> </span>6<span class=\"_ _1\"></span>.549<span class=\"_ _e2\"> </span><span class=\"ls3e ws222\">3.4<span class=\"_ _b\"> </span></span>4.593<span class=\"_ _5d\"> </span>3.822<span class=\"_ _32\"> </span>2.64<span class=\"_ _5d\"> </span>4.593<span class=\"_ _b\"> </span>2.847<span class=\"_ _73\"> </span>2.8<span class=\"_ _1a9\"> </span>Expected dividend yield<span class=\"_ _116\"> </span>-<span class=\"_ _105\"> </span>-<span class=\"_ _103\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _103\"> </span>-<span class=\"_ _b6\"> </span>-<span class=\"_ _1a9\"> </span>Expected stock price volatility<span class=\"_ _48\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _7d\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _48\"> </span>40%<span class=\"_ _2\"> </span>60%<span class=\"_ _7d\"> </span>60%<span class=\"_ _7d\"> </span>60%<span class=\"_ _2\"> </span>60%<span class=\"_ _1a9\"> </span>Risk<span class=\"_ _4\"></span>-free interest r<span class=\"_ _4\"></span>ate<span class=\"_ _28\"> </span>0<span class=\"_ _4\"></span>.59%<span class=\"_ _1b\"> </span>0<span class=\"_ _4\"></span>.59%<span class=\"_ _177\"> </span>0<span class=\"_ _4\"></span>.73%<span class=\"_ _1b\"> </span>0<span class=\"_ _4\"></span>.69%<span class=\"_ _f\"> </span>0.69%<span class=\"_ _b1\"> </span>-0.25%<span class=\"_ _f\"> </span>-0<span class=\"_ _1\"></span>.12%<span class=\"_ _1b\"> </span>-0<span class=\"_ _4\"></span>.12%<span class=\"_ _7e\"> </span>-0<span class=\"_ _4\"></span>.23%<span class=\"_ _7e\"> </span>-0<span class=\"_ _1\"></span>.38%<span class=\"_ _1a9\"> </span>Expected duration<span class=\"_ _55\"> </span>10<span class=\"_ _13\"> </span>10<span class=\"_ _3a\"> </span><span class=\"ls52 ws25b\">9.<span class=\"_ _23\"></span>5<span class=\"_ _2b\"> </span></span>9<span class=\"_ _101\"> </span>9<span class=\"_ _79\"> </span><span class=\"ls3e ws222\">8.<span class=\"_ _3\"></span>5<span class=\"_ _53\"> </span></span>8<span class=\"_ _82\"> </span>8<span class=\"_ _38\"> </span><span class=\"ls53 ws25c\">7.<span class=\"_ _23\"></span>5<span class=\"_ _36\"> </span>7.<span class=\"_ _23\"></span>5<span class=\"_ _1a9\"> </span></span>F<span class=\"_ _4\"></span>air value<span class=\"_ _118\"> </span>1<span class=\"_ _4\"></span>.56<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.29<span class=\"_ _35\"> </span>3<span class=\"_ _4\"></span>.33<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.58<span class=\"_ _36\"> </span><span class=\"ls4d ws252\">1.3<span class=\"_ _35\"> </span></span>2.23<span class=\"_ _74\"> </span>1.75<span class=\"_ _56\"> </span>1.43<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.83<span class=\"_ _56\"> </span>1<span class=\"_ _4\"></span>.56<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSharebasedPaymentArrangementsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-51": {
   "value": "5.7.10   Other short-term liabilities IN '000 EURO (AS AT 31 2022 2021 DECEMBER) Employee benefits 548 1,684 Other current liabilities 2,813 628 Total other short-term 3,361 2,312 liabilities Oxurion\u2019s Defined Benefit Obligation (\u201cDBO\u201d) is a non-cur- rent liability. Employee benefits include holiday pay, bonus, and out- standing employee taxes. The other current liabilities consist of commitments that expire before year-end, but for which an invoice was not yet received. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherCurrentLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-25": {
   "value": "5.7.10   Other short-term liabilities IN '000 EURO (AS AT 31 2022 2021 DECEMBER) Employee benefits 548 1,684 Other current liabilities 2,813 628 Total other short-term 3,361 2,312 liabilities Oxurion\u2019s Defined Benefit Obligation (\u201cDBO\u201d) is a non-cur- rent liability. Employee benefits include holiday pay, bonus, and out- standing employee taxes. The other current liabilities consist of commitments that expire before year-end, but for which an invoice was not yet received. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAccruedExpensesAndOtherLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-94": {
   "value": "5.7.10   Other short-term liabilities IN '000 EURO (AS AT 31 2022 2021 DECEMBER) Employee benefits 548 1,684 Other current liabilities 2,813 628 Total other short-term 3,361 2,312 liabilities Oxurion\u2019s Defined Benefit Obligation (\u201cDBO\u201d) is a non-cur- rent liability. Employee benefits include holiday pay, bonus, and out- standing employee taxes. The other current liabilities consist of commitments that expire before year-end, but for which an invoice was not yet received. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-26": {
   "value": "5.7.11  Convertible loans The convertible loans include the following: IN '000 EURO KREOS / NEGMA TOTAL PONTIFAX 31 December 2020 0 0 0 Proceeds from loans and borrowings 10,000 2,50012,500 Commitment fee 0 525 525 Converted into capital 0 -1,350-1,350 Fair value adjustment 25 134 159 31 December 2021 10,025 1,80911,834 Proceeds from loans and borrowings 0 7,150 7,150 Commitment fee 0 700 700 Converted into capital 0 -9,025-9,025 Repayment of loans and borro- wings -3,605 0-3,605 Fair value adjustment -436 426 -10 31 December 2022 5,984 1,060 7,044 Of which current 2,749 1,060 3,809 Of which non-current 3,235 0 3,235 The Company issued convertible bonds since 2021 with two parties as described below: Negma Group Ltd. On August 26, 2021, Oxurion (the Company or the Issuer) entered into an agreement whereby Negma as investor is willing to subscribe to, up to 12,000 zero coupon au- tomatically convertible bonds with each a nominal value of 2,500 euro, in several tranches of minimum 200 and maximum 1,000 bonds for a total committed amount up to 30 million euro. The Company as issuer controls the timing and amount of the tranche calls. The Investor is entitled to a commitment fee for an amount equal to up to 3.5% of the total commitment, i.e., up to 1.050 million euro, payable, at the option of the Issuer, either in cash or in commitment fee convertible bonds. 50% of the commitment fee is due upon signing of the agreement, the remaining 50% is due only if a tranche call is exercised by the Issuer, as a result of which in total half of the commitment will have been called by the Issuer. The conversion price is 92% of the lowest closing vol- ume-weighted average price (VWAP) over a period of 15 consecutive trading days expiring on the trading day immediately preceding the date of issuance of a con- version notice. Each convertible bond and commitment fee convertible bond has a duration of twelve months as from its date of issuance and shall accrue no interest. Any convertible bond and commitment fee convertible bond not converted into shares prior to the maturity date, shall convert automatically into shares at maturity date. The Investor has the right to convert all or any of the convert- ible bonds and commitment fee convertible bonds into new shares at any time. The number of shares to be issued upon conversion shall be equal to the conversion amount divided by the appli- cable conversion price, provided that it shall not exceed a maximum of 38,291,950 shares. If the Investor does not receive the relevant shares, the Issuer shall pay to the Investor an amount in cash (\u201cPart A of Funding Program\u201d) On September 2, 2022, the parties amended the terms and conditions of part of the funding program (\u201cPart B\u201d) for an amount of up to 6 million euro of the total com- mitment through the issuance and subscription of up to 2.400 of the convertible bonds (\u201cPart B Convertible bonds\u201d) through several Tranches (\u201cPart B Commitment\u201d), to be called by the Issuer at its discretion over the period between September 2, 2022 up to December 31, 2022 (\u201cPart B Commitment Period\u201d). The initial terms and conditions as set forth in the Issuance and Subscription Agreement remain unchanged for Part A of the Funding Program. Part A of the Funding Program was suspended during the Part B Commitment Period. Upon expiry of the Part B Commitment Period, Part A of the Funding Program was automatically reactivated (including that part of the Part B Commitment for which no Part B Convertible bonds shall have been issued and subscribed to during the Part B Commitment Period). For the Part B Commitment, the Investor is entitled to a further waiver and commitment fee equal to 0,7 million euro, payable in 280 convertible bonds for the Part B Commitment together with the first tranche of the Part B Commitment .The waiver and commitment fee convert- ible bonds have a nominal value of 0,0025 million euro each. The conversion price of the Part B convertible bonds is 80% of the lowest closing volume-weighted average price (VWAP) over a period of 15 consecutive trading days expiring on the trading day immediately preceding the date of issuance of a conversion notice.  There is no liquidity condition or cool down period. The number of shares to be issued upon conversion shall be equal to the conversion amount divided by the appli- cable conversion price. The cap of 38,291,950 shares is deleted from the terms and conditions of the agreement. The convertible bonds described above meets the defini- tion of a financial liability given that the conversion price is not fixed and upon conversion, will result in a variable number of shares being issued, being the nominal amount of the convertible loan divided by the conversion price. The convertible bond is also a derivative financial liability as the conversion feature is an embedded derivative of the loan host. The host and the derivative will not be separated and are accounted for as one hybrid financial liability. The financial liability is measured at fair value through profit or loss. The initial fair value of the convertible loan equals an amount of cash received in the amount of  9.650 million euro of which 2.5 million euro was received in 2021 and 7.150 million euro was received in 2022 (5 million euro Part A and 4.650 million euro Part B). A total of 1.350 million euro was already converted into shares before December 31, 2021. During 2022 another 9.025 million euro has been converted into shares before December 31, 2022, following the conversion of (in aggregate) 3.610 convertible bonds that were issued. Subsequently, the fair value of the convertible loan related to the Part A convertible bonds as per December 31, 2021, is determined as the nominal amount of the convertible loan plus 8%. The 8% represents the difference between the share price and the 92% of the lowest closing VWAP. Given the volatility of the share prices as per year ending December 31, 2022, the fair value of the convertible loan related to the Part B Convertible bonds is based on the intrinsic value approach. Considering the term of the convertible loan to be less than twelve months, no option pricing model is used. The outstanding convertible loan has a nominal value of 0.5 million euro as per 31 December 2022 and the fair value is determined at 1.06 million euro with changes in the fair value recorded in profit and loss as fair value gains and losses on the convertible loan. The fair value loss in the amount of 0.426 million euro as per December 31, 2022, is included in the line item \u2018Finance expense\u2019 in the consolidated statement of profit and loss. The fair value of the converted bonds during 2022 was 16.423 million euro. The difference between the fair value and the nominal amount was recorded in profit and loss as fair value loss included in the line finance expense for an amount of 7.824 million euro and 0.426 million euro in other reserves upon conversion. Upon conversion, the financial liability measured at fair value at date of conversion will be reclassified to share- holders\u2019 equity. The liability for the first instalment of the Part A commit- ment fee of 0.525 million euro (50% upon signing of the agreement) is made once the first Tranche Call is called by the Company. The commitment fee is recorded in profit and loss as transaction cost due, given the Company cannot avoid cash settlement if the Investor requests eventual payment in cash. These transaction costs are included in the line item \u2018Finance expense\u2019 in the consoli- dated statement of profit and loss. The second instalment of the Part A commitment fee of 0.525 million euro is recognized if and only if a tranche call is exercised by the Issuer, as a result of which in total more than half of the total commitment will have been called. This commitment fee is considered as a transaction cost in accordance with IFRS 9 and expensed as incurred as financial expense, given it is an incremental cost that the Company would not incur if the triggering condition is not met. This second instalment has not been accounted for as per December 31, 2022, since there is no present obligation yet. The Part B waiver and commitment fee of 0.7 million euro payable in 280 convertible bonds with a nominal value of 0.0025 million euro became due upon the payment of the first tranche under Part B pursuant to the addendum and is recorded as financial expense in the consolidated statement of profit and loss given these are considered as transactions costs. The corresponding liability is measured at fair value through profit and loss. Upon conversion the financial liability measured at fair value at the date of con- version, will be reclassified to shareholders equity. Kreos Capital / Pontifax Ventures On November 21, 2021, Oxurion (the Company or the Issuer) entered into the Loan Facility whereby Kreos Capital VI Limited together with Pontifax Medison Finance L.P. (the Investors) as investors are willing to subscribe to convertible bonds with each a nominal value of 0.1 million euro, in an amount of 10.0 million euro.  The Investors are entitled to a transaction fee of 0.125 million euro and an end of loan payment equal to 3.5% that shall accrue on the amount drawn under each tranche. The convertible bonds accrue interest in the amount of 7.95% per year. The convertible bonds may be either: 1.  Converted in shares at the option of the Investors at any time. 2.  Converted in shares at the option of the Issuer when certain conditions are met. 3.  Repaid based on the amortization schedule without extension. 4.  Repaid based on the amortization schedule with extension. 5.  Prepaid when certain conditions are met. 6.  Paid in full in case of events of default or change in control. The number of shares to be issued upon conversion shall be equal to the conversion amount divided by the applica- ble conversion price: 1.  The initial conversion price of the Bonds was equal to 2.90 euro. 2.  The conversion price may be adjusted from time to time upon the occurrence of corporate actions, such as merger, demerger, stock splits or reverse stock split, in accordance with the adjustment policy set out in the Euronext Corporate Action Policy 3.  In the event that, between the issue date of the Kreos Bonds and the date falling twelve months after the Loan Facility (i.e. 22 November 2022, the Company issued any shares in the context of an equity financing at an issue price per share which represents a discount of more than 20% to the VWAP (volume- weighted average price) over the thirty trading days period preceding the date of such issuance of shares, the Kreos Conversion Price shall be adjusted to 140% of the average issue price of all shares issued by the Company in the context of any equity financing since the issue date of the Kreos Bonds (if lower than the Kreos Conversion Price). As a result, the strike price was reset at 0.28 euro per share. On June 21, 2022, the Company, Kreos Capital VI Limited and Pontifax Medison Finance L.P. executed an amendment to the convertible bond facility, pursuant to which a repayment of 3.0 million euro (30%) of the principal amount (excluding capitalized interest) of the first tranche of 10.0 million euro was made. As part of the amendment, it was agreed that the cash covenant would be reduced from 4.0 million euro to 3.0 million euro, the repayment schedule was revised and the interest only period was extended to September 30, 2022. At the same time, Kreos/Pontifax agreed not exercise any rights they might have had to recover amounts owed to them under the Loan Agreement provided that certain conditions are met, the fulfilment of which is uncertain. The convertible bond described above meets the definition of a financial liability given that the Company cannot avoid delivering cash to the investors and the conversion price is not fixed. The Company cannot avoid delivering cash as they do not have control over the different scenarios. The conversion price can also change upon certain scenario\u2019s as described above and as such the number of shares being issued will vary based on the conversion price. The convertible bond is also a derivative financial liability as the conversion feature is an embedded derivative of the loan host. The host and the derivative will not be separated. The financial liability is measured at fair value through profit or loss. In determining the fair value, the company makes certain judgements on the valuation model to be applied and the probability that certain scenarios will occur or not in the future. The fair value of the convertible bonds has been measured considering the following scenarios that may impact the term of the bond: 1.  No extension 2.  With extension 3.  Prepaid when certain conditions are met. 4.  Paid in full in case of events of default or change in control. The initial fair value of the convertible loan equals the amount of cash received which is 10.0 million euro as per December 31, 2021. Subsequently the fair value is de- termined as the probability weighted average of the fair values of the different scenarios described above consid- ering the pre-payment agreed on June 21, 2022. The fair value of the scenarios has been determined by application of the effective interest rate method and the Black-Scholes model. The payment by the Company to Pontifax Medison Finance L.P is paid in USD by converting the relevant due amount in euro into the USD at a fixed exchange rate. For Pontifax, the fair value of the convertible loan is deter- mined based on the application of the effective interest rate method considering the USD loan payment at the spot rate at valuation date. The above fair value measurement is a level 3 as a result of the unobservable input for the probabilities. A reason- able change of the probabilities between the different sce- nario\u2019s would not lead to a material change in the fair value. The fair value as per December 31, 2022, is determined at 5.984 million euro, taking into account the repayment of 3 million euro, with changes in the fair value recorded in profit and loss as fair value gains and losses on the con- vertible loan. The fair value gain in the amount of 0.436 million euro as per December 31, 2022, are included in the line item \u2018Finance income\u2019 in the consolidated statement of profit and loss. No amounts have already been converted into shares as per December 31, 2022. Upon conversion, the financial liability measured at fair value at date of conversion will be reclassified to share- holders\u2019 equity, being share capital and share premium and other reserves for the fair value adjustment portion. The Loan Facility is subject to a financial covenant whereby the Group is required to maintain at all times a minimum aggregate amount of cash in the bank of an amount equal to the lower of 3 million euro and the principal amount outstanding. The Group has complied with the financial covenant at December 31, 202 2 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialInstrumentsDesignatedAtFairValueThroughProfitOrLossExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-108": {
   "value": "5.7.11  Convertible loans The convertible loans include the following: IN '000 EURO KREOS / NEGMA TOTAL PONTIFAX 31 December 2020 0 0 0 Proceeds from loans and borrowings 10,000 2,50012,500 Commitment fee 0 525 525 Converted into capital 0 -1,350-1,350 Fair value adjustment 25 134 159 31 December 2021 10,025 1,80911,834 Proceeds from loans and borrowings 0 7,150 7,150 Commitment fee 0 700 700 Converted into capital 0 -9,025-9,025 Repayment of loans and borro- wings -3,605 0-3,605 Fair value adjustment -436 426 -10 31 December 2022 5,984 1,060 7,044 Of which current 2,749 1,060 3,809 Of which non-current 3,235 0 3,235 The Company issued convertible bonds since 2021 with two parties as described below: Negma Group Ltd. On August 26, 2021, Oxurion (the Company or the Issuer) entered into an agreement whereby Negma as investor is willing to subscribe to, up to 12,000 zero coupon au- tomatically convertible bonds with each a nominal value of 2,500 euro, in several tranches of minimum 200 and  bonds\u201d) through several Tranches (\u201cPart B Commitment\u201d),  maximum 1,000 bonds for a total committed amount up  to be called by the Issuer at its discretion over the period  to 30 million euro. The Company as issuer controls the  between September 2, 2022 up to December 31, 2022  timing and amount of the tranche calls. (\u201cPart B Commitment Period\u201d). The Investor is entitled to a commitment fee for an  The initial terms and conditions as set forth in the Issuance  amount equal to up to 3.5% of the total commitment, i.e., and Subscription Agreement remain unchanged for Part  up to 1.050 million euro, payable, at the option of the Issuer, A of the Funding Program. Part A of the Funding Program  either in cash or in commitment fee convertible bonds.  was suspended during the Part B Commitment Period.  50% of the commitment fee is due upon signing of the  Upon expiry of the Part B Commitment Period, Part A  agreement, the remaining 50% is due only if a tranche call  of the Funding Program was automatically reactivated  is exercised by the Issuer, as a result of which in total half of  (including that part of the Part B Commitment for which  the commitment will have been called by the Issuer. no Part B Convertible bonds shall have been issued and  subscribed to during the Part B Commitment Period). The conversion price is 92% of the lowest closing vol- ume-weighted average price (VWAP) over a period of  For the Part B Commitment, the Investor is entitled to a  15 consecutive trading days expiring on the trading day  further waiver and commitment fee equal to 0,7 million  immediately preceding the date of issuance of a con- euro, payable in 280 convertible bonds for the Part B  version notice. Each convertible bond and commitment  Commitment together with the first tranche of the Part B  fee convertible bond has a duration of twelve months as  Commitment .The waiver and commitment fee convert- from its date of issuance and shall accrue no interest. Any  ible bonds have a nominal value of 0,0025 million euro  convertible bond and commitment fee convertible bond  each. not converted into shares prior to the maturity date, shall  convert automatically into shares at maturity date. The  The conversion price of the Part B convertible bonds is  Investor has the right to convert all or any of the convert- 80% of the lowest closing volume-weighted average  ible bonds and commitment fee convertible bonds into  price (VWAP) over a period of 15 consecutive trading  new shares at any time.  days expiring on the trading day immediately preceding  the date of issuance of a conversion notice.  There is no  The number of shares to be issued upon conversion shall  liquidity condition or cool down period. be equal to the conversion amount divided by the appli- cable conversion price, provided that it shall not exceed  The number of shares to be issued upon conversion shall  a maximum of 38,291,950 shares. If the Investor does  be equal to the conversion amount divided by the appli- not receive the relevant shares, the Issuer shall pay to the  cable conversion price. The cap of 38,291,950 shares is  Investor an amount in cash (\u201cPart A of Funding Program\u201d) deleted from the terms and conditions of the agreement.  On September 2, 2022, the parties amended the terms  The convertible bonds described above meets the defini- and conditions of part of the funding program (\u201cPart B\u201d)  tion of a financial liability given that the conversion price  for an amount of up to 6 million euro of the total com- is not fixed and upon conversion, will result in a variable  mitment through the issuance and subscription of up  number of shares being issued, being the nominal amount  to 2.400 of the convertible bonds (\u201cPart B Convertible  of the convertible loan divided by the conversion price. The convertible bond is also a derivative financial liability as the conversion feature is an embedded derivative of the loan host. The host and the derivative will not be separated and are accounted for as one hybrid financial liability. The financial liability is measured at fair value through profit or loss. The initial fair value of the convertible loan equals an amount of cash received in the amount of  9.650 million euro of which 2.5 million euro was received in 2021 and 7.150 million euro was received in 2022 (5 million euro Part A and 4.650 million euro Part B). A total of 1.350 million euro was already converted into shares before December 31, 2021. During 2022 another 9.025 million euro has been converted into shares before December 31, 2022, following the conversion of (in aggregate) 3.610 convertible bonds that were issued. Subsequently, the fair value of the convertible loan related to the Part A convertible bonds as per December 31, 2021, is determined as the nominal amount of the convertible loan plus 8%. The 8% represents the difference between the share price and the 92% of the lowest closing VWAP. Given the volatility of the share prices as per year ending December 31, 2022, the fair value of the convertible loan related to the Part B Convertible bonds is based on the intrinsic value approach. Considering the term of the convertible loan to be less than twelve months, no option pricing model is used. The outstanding convertible loan has a nominal value of 0.5 million euro as per 31 December 2022 and the fair value is determined at 1.06 million euro with changes in the fair value recorded in profit and loss as fair value gains and losses on the convertible loan. The fair value loss in the amount of 0.426 million euro as per December 31, 2022, is included in the line item \u2018Finance expense\u2019 in the consolidated statement of profit and loss. The fair value of the converted bonds during 2022 was 16.423 million euro. The difference between the fair value and the nominal amount was recorded in profit and loss as fair value loss included in the line finance expense for an amount of 7.824 million euro and 0.426 million euro in other reserves upon conversion. Upon conversion, the financial liability measured at fair value at date of conversion will be reclassified to share- holders\u2019 equity. The liability for the first instalment of the Part A commit- ment fee of 0.525 million euro (50% upon signing of the agreement) is made once the first Tranche Call is called by the Company. The commitment fee is recorded in profit and loss as transaction cost due, given the Company cannot avoid cash settlement if the Investor requests eventual payment in cash. These transaction costs are included in the line item \u2018Finance expense\u2019 in the consoli- dated statement of profit and loss. The second instalment of the Part A commitment fee of 0.525 million euro is recognized if and only if a tranche call is exercised by the Issuer, as a result of which in total more than half of the total commitment will have been called. This commitment fee is considered as a transaction cost in accordance with IFRS 9 and expensed as incurred as financial expense, given it is an incremental cost that the Company would not incur if the triggering condition is not met. This second instalment has not been accounted for as per December 31, 2022, since there is no present obligation yet. The Part B waiver and commitment fee of 0.7 million euro payable in 280 convertible bonds with a nominal value of 0.0025 million euro became due upon the payment of the first tranche under Part B pursuant to the addendum and is recorded as financial expense in the consolidated statement of profit and loss given these are considered as transactions costs. The corresponding liability is measured  2.  The conversion price may be adjusted from time to  at fair value through profit and loss. Upon conversion the  time upon the occurrence of corporate actions, such  financial liability measured at fair value at the date of con- as merger, demerger, stock splits or reverse stock split, version, will be reclassified to shareholders equity.  in accordance with the adjustment policy set out in the  Euronext Corporate Action Policy Kreos Capital / Pontifax Ventures 3.  In the event that, between the issue date of the Kreos  Bonds and the date falling twelve months after the  On November 21, 2021, Oxurion (the Company or the  Loan Facility (i.e. 22 November 2022, the Company  Issuer) entered into the Loan Facility whereby Kreos  issued any shares in the context of an equity financing  Capital VI Limited together with Pontifax Medison  at an issue price per share which represents a  Finance L.P. (the Investors) as investors are willing to  discount of more than 20% to the VWAP (volume- subscribe to convertible bonds with each a nominal value  weighted average price) over the thirty trading days  of 0.1 million euro, in an amount of 10.0 million euro.  period preceding the date of such issuance of shares, The Investors are entitled to a transaction fee of 0.125  the Kreos Conversion Price shall be adjusted to 140%  million euro and an end of loan payment equal to 3.5%  of the average issue price of all shares issued by the  that shall accrue on the amount drawn under each tranche.  Company in the context of any equity financing since  The convertible bonds accrue interest in the amount of  the issue date of the Kreos Bonds (if lower than the  7.95% per year.  Kreos Conversion Price). As a result, the strike price  was reset at 0.28 euro per share. The convertible bonds may be either: On June 21, 2022, the Company, Kreos Capital VI  1.  Converted in shares at the option of the Investors at  Limited and Pontifax Medison Finance L.P. executed an  any time. amendment to the convertible bond facility, pursuant  2.  Converted in shares at the option of the Issuer when  to which a repayment of 3.0 million euro (30%) of the  certain conditions are met. principal amount (excluding capitalized interest) of the  3.  Repaid based on the amortization schedule without  first tranche of 10.0 million euro was made. As part of the  extension. amendment, it was agreed that the cash covenant would  4.  Repaid based on the amortization schedule with  be reduced from 4.0 million euro to 3.0 million euro, the  extension. repayment schedule was revised and the interest only  5.  Prepaid when certain conditions are met. period was extended to September 30, 2022. At the same  6.  Paid in full in case of events of default or change in  time, Kreos/Pontifax agreed not exercise any rights they  control. might have had to recover amounts owed to them under  the Loan Agreement provided that certain conditions are  The number of shares to be issued upon conversion shall  met, the fulfilment of which is uncertain. be equal to the conversion amount divided by the applica- ble conversion price: The convertible bond described above meets the definition  of a financial liability given that the Company cannot avoid  1.  The initial conversion price of the Bonds was equal to  delivering cash to the investors and the conversion price  2.90 euro. is not fixed. The Company cannot avoid delivering cash as  they do not have control over the different scenarios. The  conversion price can also change upon certain scenario\u2019s as described above and as such the number of shares being issued will vary based on the conversion price. The convertible bond is also a derivative financial liability as the conversion feature is an embedded derivative of the loan host. The host and the derivative will not be separated. The financial liability is measured at fair value through profit or loss. In determining the fair value, the company makes certain judgements on the valuation model to be applied and the probability that certain scenarios will occur or not in the future. The fair value of the convertible bonds has been measured considering the following scenarios that may impact the term of the bond: 1.  No extension 2.  With extension 3.  Prepaid when certain conditions are met. 4.  Paid in full in case of events of default or change in control. The initial fair value of the convertible loan equals the amount of cash received which is 10.0 million euro as per December 31, 2021. Subsequently the fair value is de- termined as the probability weighted average of the fair values of the different scenarios described above consid- ering the pre-payment agreed on June 21, 2022. The fair value of the scenarios has been determined by application of the effective interest rate method and the Black-Scholes model. The payment by the Company to Pontifax Medison Finance L.P is paid in USD by converting the relevant due amount in euro into the USD at a fixed exchange rate. For Pontifax, the fair value of the convertible loan is deter- mined based on the application of the effective interest rate method considering the USD loan payment at the spot rate at valuation date. The above fair value measurement is a level 3 as a result of the unobservable input for the probabilities. A reason- able change of the probabilities between the different sce- nario\u2019s would not lead to a material change in the fair value. The fair value as per December 31, 2022, is determined at 5.984 million euro, taking into account the repayment of 3 million euro, with changes in the fair value recorded in profit and loss as fair value gains and losses on the con- vertible loan. The fair value gain in the amount of 0.436 million euro as per December 31, 2022, are included in the line item \u2018Finance income\u2019 in the consolidated statement of profit and loss. No amounts have already been converted into shares as per December 31, 2022. Upon conversion, the financial liability measured at fair value at date of conversion will be reclassified to share- holders\u2019 equity, being share capital and share premium and other reserves for the fair value adjustment portion. The Loan Facility is subject to a financial covenant whereby the Group is required to maintain at all times a minimum aggregate amount of cash in the bank of an amount equal to the lower of 3 million euro and the principal amount outstanding. The Group has complied with the financial covenant at December 31, 202 2 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialInstrumentsAtFairValueThroughProfitOrLossExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-138": {
   "value": "5.7.11  Convertible loans The convertible loans include the following: IN '000 EURO KREOS / NEGMA TOTAL PONTIFAX 31 December 2020 0 0 0 Proceeds from loans and borrowings 10,000 2,50012,500 Commitment fee 0 525 525 Converted into capital 0 -1,350-1,350 Fair value adjustment 25 134 159 31 December 2021 10,025 1,80911,834 Proceeds from loans and borrowings 0 7,150 7,150 Commitment fee 0 700 700 Converted into capital 0 -9,025-9,025 Repayment of loans and borro- wings -3,605 0-3,605 Fair value adjustment -436 426 -10 31 December 2022 5,984 1,060 7,044 Of which current 2,749 1,060 3,809 Of which non-current 3,235 0 3,235 The Company issued convertible bonds since 2021 with two parties as described below: Negma Group Ltd. On August 26, 2021, Oxurion (the Company or the Issuer) entered into an agreement whereby Negma as investor is willing to subscribe to, up to 12,000 zero coupon au- tomatically convertible bonds with each a nominal value of 2,500 euro, in several tranches of minimum 200 and  bonds\u201d) through several Tranches (\u201cPart B Commitment\u201d),  maximum 1,000 bonds for a total committed amount up  to be called by the Issuer at its discretion over the period  to 30 million euro. The Company as issuer controls the  between September 2, 2022 up to December 31, 2022  timing and amount of the tranche calls. (\u201cPart B Commitment Period\u201d). The Investor is entitled to a commitment fee for an  The initial terms and conditions as set forth in the Issuance  amount equal to up to 3.5% of the total commitment, i.e., and Subscription Agreement remain unchanged for Part  up to 1.050 million euro, payable, at the option of the Issuer, A of the Funding Program. Part A of the Funding Program  either in cash or in commitment fee convertible bonds.  was suspended during the Part B Commitment Period.  50% of the commitment fee is due upon signing of the  Upon expiry of the Part B Commitment Period, Part A  agreement, the remaining 50% is due only if a tranche call  of the Funding Program was automatically reactivated  is exercised by the Issuer, as a result of which in total half of  (including that part of the Part B Commitment for which  the commitment will have been called by the Issuer. no Part B Convertible bonds shall have been issued and  subscribed to during the Part B Commitment Period). The conversion price is 92% of the lowest closing vol- ume-weighted average price (VWAP) over a period of  For the Part B Commitment, the Investor is entitled to a  15 consecutive trading days expiring on the trading day  further waiver and commitment fee equal to 0,7 million  immediately preceding the date of issuance of a con- euro, payable in 280 convertible bonds for the Part B  version notice. Each convertible bond and commitment  Commitment together with the first tranche of the Part B  fee convertible bond has a duration of twelve months as  Commitment .The waiver and commitment fee convert- from its date of issuance and shall accrue no interest. Any  ible bonds have a nominal value of 0,0025 million euro  convertible bond and commitment fee convertible bond  each. not converted into shares prior to the maturity date, shall  convert automatically into shares at maturity date. The  The conversion price of the Part B convertible bonds is  Investor has the right to convert all or any of the convert- 80% of the lowest closing volume-weighted average  ible bonds and commitment fee convertible bonds into  price (VWAP) over a period of 15 consecutive trading  new shares at any time.  days expiring on the trading day immediately preceding  the date of issuance of a conversion notice.  There is no  The number of shares to be issued upon conversion shall  liquidity condition or cool down period. be equal to the conversion amount divided by the appli- cable conversion price, provided that it shall not exceed  The number of shares to be issued upon conversion shall  a maximum of 38,291,950 shares. If the Investor does  be equal to the conversion amount divided by the appli- not receive the relevant shares, the Issuer shall pay to the  cable conversion price. The cap of 38,291,950 shares is  Investor an amount in cash (\u201cPart A of Funding Program\u201d) deleted from the terms and conditions of the agreement.  On September 2, 2022, the parties amended the terms  The convertible bonds described above meets the defini- and conditions of part of the funding program (\u201cPart B\u201d)  tion of a financial liability given that the conversion price  for an amount of up to 6 million euro of the total com- is not fixed and upon conversion, will result in a variable  mitment through the issuance and subscription of up  number of shares being issued, being the nominal amount  to 2.400 of the convertible bonds (\u201cPart B Convertible  of the convertible loan divided by the conversion price. The convertible bond is also a derivative financial liability as the conversion feature is an embedded derivative of the loan host. The host and the derivative will not be separated and are accounted for as one hybrid financial liability. The financial liability is measured at fair value through profit or loss. The initial fair value of the convertible loan equals an amount of cash received in the amount of  9.650 million euro of which 2.5 million euro was received in 2021 and 7.150 million euro was received in 2022 (5 million euro Part A and 4.650 million euro Part B). A total of 1.350 million euro was already converted into shares before December 31, 2021. During 2022 another 9.025 million euro has been converted into shares before December 31, 2022, following the conversion of (in aggregate) 3.610 convertible bonds that were issued. Subsequently, the fair value of the convertible loan related to the Part A convertible bonds as per December 31, 2021, is determined as the nominal amount of the convertible loan plus 8%. The 8% represents the difference between the share price and the 92% of the lowest closing VWAP. Given the volatility of the share prices as per year ending December 31, 2022, the fair value of the convertible loan related to the Part B Convertible bonds is based on the intrinsic value approach. Considering the term of the convertible loan to be less than twelve months, no option pricing model is used. The outstanding convertible loan has a nominal value of 0.5 million euro as per 31 December 2022 and the fair value is determined at 1.06 million euro with changes in the fair value recorded in profit and loss as fair value gains and losses on the convertible loan. The fair value loss in the amount of 0.426 million euro as per December 31, 2022, is included in the line item \u2018Finance expense\u2019 in the consolidated statement of profit and loss. The fair value of the converted bonds during 2022 was 16.423 million euro. The difference between the fair value and the nominal amount was recorded in profit and loss as fair value loss included in the line finance expense for an amount of 7.824 million euro and 0.426 million euro in other reserves upon conversion. Upon conversion, the financial liability measured at fair value at date of conversion will be reclassified to share- holders\u2019 equity. The liability for the first instalment of the Part A commit- ment fee of 0.525 million euro (50% upon signing of the agreement) is made once the first Tranche Call is called by the Company. The commitment fee is recorded in profit and loss as transaction cost due, given the Company cannot avoid cash settlement if the Investor requests eventual payment in cash. These transaction costs are included in the line item \u2018Finance expense\u2019 in the consoli- dated statement of profit and loss. The second instalment of the Part A commitment fee of 0.525 million euro is recognized if and only if a tranche call is exercised by the Issuer, as a result of which in total more than half of the total commitment will have been called. This commitment fee is considered as a transaction cost in accordance with IFRS 9 and expensed as incurred as financial expense, given it is an incremental cost that the Company would not incur if the triggering condition is not met. This second instalment has not been accounted for as per December 31, 2022, since there is no present obligation yet. The Part B waiver and commitment fee of 0.7 million euro payable in 280 convertible bonds with a nominal value of 0.0025 million euro became due upon the payment of the first tranche under Part B pursuant to the addendum and is recorded as financial expense in the consolidated statement of profit and loss given these are considered as transactions costs. The corresponding liability is measured  2.  The conversion price may be adjusted from time to  at fair value through profit and loss. Upon conversion the  time upon the occurrence of corporate actions, such  financial liability measured at fair value at the date of con- as merger, demerger, stock splits or reverse stock split, version, will be reclassified to shareholders equity.  in accordance with the adjustment policy set out in the  Euronext Corporate Action Policy Kreos Capital / Pontifax Ventures 3.  In the event that, between the issue date of the Kreos  Bonds and the date falling twelve months after the  On November 21, 2021, Oxurion (the Company or the  Loan Facility (i.e. 22 November 2022, the Company  Issuer) entered into the Loan Facility whereby Kreos  issued any shares in the context of an equity financing  Capital VI Limited together with Pontifax Medison  at an issue price per share which represents a  Finance L.P. (the Investors) as investors are willing to  discount of more than 20% to the VWAP (volume- subscribe to convertible bonds with each a nominal value  weighted average price) over the thirty trading days  of 0.1 million euro, in an amount of 10.0 million euro.  period preceding the date of such issuance of shares, The Investors are entitled to a transaction fee of 0.125  the Kreos Conversion Price shall be adjusted to 140%  million euro and an end of loan payment equal to 3.5%  of the average issue price of all shares issued by the  that shall accrue on the amount drawn under each tranche.  Company in the context of any equity financing since  The convertible bonds accrue interest in the amount of  the issue date of the Kreos Bonds (if lower than the  7.95% per year.  Kreos Conversion Price). As a result, the strike price  was reset at 0.28 euro per share. The convertible bonds may be either: On June 21, 2022, the Company, Kreos Capital VI  1.  Converted in shares at the option of the Investors at  Limited and Pontifax Medison Finance L.P. executed an  any time. amendment to the convertible bond facility, pursuant  2.  Converted in shares at the option of the Issuer when  to which a repayment of 3.0 million euro (30%) of the  certain conditions are met. principal amount (excluding capitalized interest) of the  3.  Repaid based on the amortization schedule without  first tranche of 10.0 million euro was made. As part of the  extension. amendment, it was agreed that the cash covenant would  4.  Repaid based on the amortization schedule with  be reduced from 4.0 million euro to 3.0 million euro, the  extension. repayment schedule was revised and the interest only  5.  Prepaid when certain conditions are met. period was extended to September 30, 2022. At the same  6.  Paid in full in case of events of default or change in  time, Kreos/Pontifax agreed not exercise any rights they  control. might have had to recover amounts owed to them under  the Loan Agreement provided that certain conditions are  The number of shares to be issued upon conversion shall  met, the fulfilment of which is uncertain. be equal to the conversion amount divided by the applica- ble conversion price: The convertible bond described above meets the definition  of a financial liability given that the Company cannot avoid  1.  The initial conversion price of the Bonds was equal to  delivering cash to the investors and the conversion price  2.90 euro. is not fixed. The Company cannot avoid delivering cash as  they do not have control over the different scenarios. The  conversion price can also change upon certain scenario\u2019s as described above and as such the number of shares being issued will vary based on the conversion price. The convertible bond is also a derivative financial liability as the conversion feature is an embedded derivative of the loan host. The host and the derivative will not be separated. The financial liability is measured at fair value through profit or loss. In determining the fair value, the company makes certain judgements on the valuation model to be applied and the probability that certain scenarios will occur or not in the future. The fair value of the convertible bonds has been measured considering the following scenarios that may impact the term of the bond: 1.  No extension 2.  With extension 3.  Prepaid when certain conditions are met. 4.  Paid in full in case of events of default or change in control. The initial fair value of the convertible loan equals the amount of cash received which is 10.0 million euro as per December 31, 2021. Subsequently the fair value is de- termined as the probability weighted average of the fair values of the different scenarios described above consid- ering the pre-payment agreed on June 21, 2022. The fair value of the scenarios has been determined by application of the effective interest rate method and the Black-Scholes model. The payment by the Company to Pontifax Medison Finance L.P is paid in USD by converting the relevant due amount in euro into the USD at a fixed exchange rate. For Pontifax, the fair value of the convertible loan is deter- mined based on the application of the effective interest rate method considering the USD loan payment at the spot rate at valuation date. The above fair value measurement is a level 3 as a result of the unobservable input for the probabilities. A reason- able change of the probabilities between the different sce- nario\u2019s would not lead to a material change in the fair value. The fair value as per December 31, 2022, is determined at 5.984 million euro, taking into account the repayment of 3 million euro, with changes in the fair value recorded in profit and loss as fair value gains and losses on the con- vertible loan. The fair value gain in the amount of 0.436 million euro as per December 31, 2022, are included in the line item \u2018Finance income\u2019 in the consolidated statement of profit and loss. No amounts have already been converted into shares as per December 31, 2022. Upon conversion, the financial liability measured at fair value at date of conversion will be reclassified to share- holders\u2019 equity, being share capital and share premium and other reserves for the fair value adjustment portion. The Loan Facility is subject to a financial covenant whereby the Group is required to maintain at all times a minimum aggregate amount of cash in the bank of an amount equal to the lower of 3 million euro and the principal amount outstanding. The Group has complied with the financial covenant at December 31, 202 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDerivativeFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-27": {
   "value": "5.8  OTHER CLARIFICATION NOTES TO THE STATEMENT OF FINANCIAL POSITION Subsidiaries and branches NAME OF THE PLACE OF  PRINCIPAL SUBSIDIARY INCORPORATION 2022 2021ACTIVITY AND OPERATION Thrombo- Genics, Inc. US 100% 100% Distributor Oncurious BE 100% 83.34%Research NV (oncology) At year-end 2021, out of a new total of 12,111 shares in the share capital of Oncurious, Oxurion owned 10,093 shares or 83.34%. Due to a capital increase in Oncurious by VIB through a contribution in kind of a receivable from VIB to Oncurious for 86,299 euro, VIB\u2019s non-controlling interest increased with 0.5 million euro and the equity attributable to equity holders of the company decreased with 0.5 million euro. The effect of which is presented in the line item \u2018trans- actions with non-controlling interests\u2019 in the statement of changes in equity. In the line item \u2018transactions with non-controlling interests\u2019 presented in the statement of changes in equity, the effect of the transfer between equity attributable to equity holders of the company and the non-controlling interest is presented resulting from the exercise of the call option by VIB leading to the transfer of 680 shares in the share capital of Oncurious from Oxurion to VIB. We refer to note 5.8 under the heading Flanders Institute for Biotechnology for more information on the exercise of the call options which were granted by Oxurion to VIB. On December 14, 2022, Oxurion purchased 2,018 shares from VIB for 1 euro. As of this date, the ownership of the shares transferred and Oxurion owned 12,111 shares or 100% ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInterestsInOtherEntitiesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-52": {
   "value": "5.8  OTHER CLARIFICATION NOTES TO THE STATEMENT OF FINANCIAL POSITION Subsidiaries and branches NAME OF THE PLACE OF  PRINCIPAL SUBSIDIARY INCORPORATION 2022 2021ACTIVITY AND OPERATION Thrombo- Genics, Inc. US 100% 100% Distributor Oncurious BE 100% 83.34%Research NV (oncology) At year-end 2021, out of a new total of 12,111 shares in the share capital of Oncurious, Oxurion owned 10,093 shares or 83.34%. Due to a capital increase in Oncurious by VIB through a contribution in kind of a receivable from VIB to Oncurious for 86,299 euro, VIB\u2019s non-controlling interest increased with 0.5 million euro and the equity attributable to equity holders of the company decreased with 0.5 million euro. The effect of which is presented in the line item \u2018trans- actions with non-controlling interests\u2019 in the statement of changes in equity. In the line item \u2018transactions with non-controlling interests\u2019 presented in the statement of changes in equity, the effect of the transfer between equity attributable to equity holders of the company and the non-controlling interest is presented resulting from the exercise of the call option by VIB leading to the transfer of 680 shares in the share capital of Oncurious from Oxurion to VIB. We refer to note 5.8 under the heading Flanders Institute for Biotechnology for more information on the exercise of the call options which were granted by Oxurion to VIB. On December 14, 2022, Oxurion purchased 2,018 shares from VIB for 1 euro. As of this date, the ownership of the shares transferred and Oxurion owned 12,111 shares or 100% ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSignificantInvestmentsInSubsidiariesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-121": {
   "value": "Key Agreements,<span class=\"_ _1\"></span> Commitments and Contingent Liabilities<span class=\"_ _1a9\"> </span>In addition to the convertible loan agreements described in the preceding section,<span class=\"_ _1\"></span> the Group has a number of other material agreements with third parties. Please find below an o<span class=\"_ _4\"></span>ver<span class=\"_ _3\"></span>view of Oxurion\u2019<span class=\"_ _25\"></span>s material agree<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>ments. An agr<span class=\"_ _4\"></span>eement is considered as \u201cmaterial<span class=\"_ _4\"></span>\u201d when the contractual commitments reac<span class=\"_ _4\"></span>h over 1 million euro<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> or in case of a new agreement,<span class=\"_ _1\"></span> when such an impact is expected in the twelve-month period after the r<span class=\"_ _4\"></span>eporting date.<span class=\"_ _1a9\"> </span>Note that certain agreements may include sharing of R&amp;D costs and/or sharing of revenue<span class=\"_ _4\"></span>. Although these agreements may include the establishment of a joint committee whic<span class=\"_ _4\"></span>h monitors the joint activities,<span class=\"_ _1\"></span> these arrangements are out of the scope of IFRS 11 \u201cJoint Arr<span class=\"_ _4\"></span>angements<span class=\"_ _4\"></span>\u201d,<span class=\"_ _4\"></span> as the Compan<span class=\"_ _4\"></span>y has concluded that no joint control exists<span class=\"_ _4\"></span>. The main indica<span class=\"_ _4\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tors found in the multip<span class=\"_ _4\"></span>le arrangements that resulted in the conclusion that Oxurion has control o<span class=\"_ _4\"></span>ver the operations and relevant activities and theref<span class=\"_ _4\"></span>ore is the decision-making party in the agreements are as f<span class=\"_ _4\"></span>ollows:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws265\">Oxurion has sole and exclusive decision-making </span>authority on the development activities,<span class=\"_ _1\"></span> including but not limited to the development plan.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws72\">Oxurion bears the costs and expenses for all activities </span>under the development plan.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws1a1\">Oxurion is responsible for preparing,<span class=\"_ _1\"></span> filing and main<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></span>taining regulator<span class=\"_ _3\"></span>y approvals<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"wsa4\">Oxurion has the sole responsibility and decision-mak<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></span>ing authority for manufacturing and commercialization.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws1d\">Oxurion shall be the sole and exclusive owner of all </span>intellectual property in most agreements<span class=\"_ _1a9\"> </span>Contingent liability<span class=\"_ _1a9\"> </span>The expenses incurr<span class=\"_ _4\"></span>ed in several of the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s research<span class=\"_ _1a9\"> </span>and development programs ha<span class=\"_ _4\"></span>ve been reimbursed b<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span>VLAIO<span class=\"_ _25\"></span>, former<span class=\"_ _4\"></span>ly known as IWT<span class=\"_ _0\"></span>, as a g<span class=\"_ _4\"></span>overnment grant.<span class=\"_ _1a9\"> </span>Contracts with VLAIO generall<span class=\"_ _4\"></span>y include a clause that<span class=\"_ _1a9\"> </span>defines the need for validation of the project results in<span class=\"_ _1a9\"> </span>order for the grant to be eff<span class=\"_ _4\"></span>ectively earned<span class=\"_ _4\"></span>. Should this<span class=\"_ _1a9\"> </span>validation not occur<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> VLAIO has the right to reclaim the<span class=\"_ _1a9\"> </span>funds previously gr<span class=\"_ _4\"></span>anted<span class=\"_ _4\"></span>. The Gr<span class=\"_ _4\"></span>oup considers this as a<span class=\"_ _1a9\"> </span>remote possibility<span class=\"_ _25\"></span>. Please refer to the accounting policy<span class=\"_ _1a9\"> </span>described in section 5<span class=\"_ _1\"></span>.5<span class=\"_ _4\"></span>.3 (G) and the rationale used in<span class=\"_ _1a9\"> </span>order to recognize gr<span class=\"_ _4\"></span>ant income over the course of the<span class=\"_ _1a9\"> </span>project. T<span class=\"_ _25\"></span>otal amounts received in 2021 with respect to<span class=\"_ _1a9\"> </span>government gr<span class=\"_ _4\"></span>ants from VLAIO amount to 0<span class=\"_ _1\"></span>.228 million<span class=\"_ _1a9\"> </span>euro<span class=\"_ _4\"></span>. No amounts w<span class=\"_ _4\"></span>ere r<span class=\"_ _4\"></span>eceived in 2022.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfContingentLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-95": {
   "value": "Key Agreements,<span class=\"_ _1\"></span> Commitments and Contingent Liabilities<span class=\"_ _1a9\"> </span>In addition to the convertible loan agreements described in the preceding section,<span class=\"_ _1\"></span> the Group has a number of other material agreements with third parties. Please find below an o<span class=\"_ _4\"></span>ver<span class=\"_ _3\"></span>view of Oxurion\u2019<span class=\"_ _25\"></span>s material agree<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>ments. An agr<span class=\"_ _4\"></span>eement is considered as \u201cmaterial<span class=\"_ _4\"></span>\u201d when the contractual commitments reac<span class=\"_ _4\"></span>h over 1 million euro<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> or in case of a new agreement,<span class=\"_ _1\"></span> when such an impact is expected in the twelve-month period after the r<span class=\"_ _4\"></span>eporting date.<span class=\"_ _1a9\"> </span>Note that certain agreements may include sharing of R&amp;D costs and/or sharing of revenue<span class=\"_ _4\"></span>. Although these agreements may include the establishment of a joint committee whic<span class=\"_ _4\"></span>h monitors the joint activities,<span class=\"_ _1\"></span> these arrangements are out of the scope of IFRS 11 \u201cJoint Arr<span class=\"_ _4\"></span>angements<span class=\"_ _4\"></span>\u201d,<span class=\"_ _4\"></span> as the Compan<span class=\"_ _4\"></span>y has concluded that no joint control exists<span class=\"_ _4\"></span>. The main indica<span class=\"_ _4\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tors found in the multip<span class=\"_ _4\"></span>le arrangements that resulted in the conclusion that Oxurion has control o<span class=\"_ _4\"></span>ver the operations and relevant activities and theref<span class=\"_ _4\"></span>ore is the decision-making party in the agreements are as f<span class=\"_ _4\"></span>ollows:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws265\">Oxurion has sole and exclusive decision-making </span>authority on the development activities,<span class=\"_ _1\"></span> including but not limited to the development plan.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws72\">Oxurion bears the costs and expenses for all activities </span>under the development plan.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws1a1\">Oxurion is responsible for preparing,<span class=\"_ _1\"></span> filing and main<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></span>taining regulator<span class=\"_ _3\"></span>y approvals<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"wsa4\">Oxurion has the sole responsibility and decision-mak<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></span>ing authority for manufacturing and commercialization.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws1d\">Oxurion shall be the sole and exclusive owner of all </span>intellectual property in most agreements<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>Research and Development Agr<span class=\"_ _4\"></span>eements<span class=\"_ _1a9\"> </span>Bicycle Ther<span class=\"_ _4\"></span>apeutics<span class=\"_ _1a9\"> </span>In August 2013<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion entered into a resear<span class=\"_ _4\"></span>ch collabor<span class=\"_ _4\"></span>a<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tion and license agreement with Bicy<span class=\"_ _4\"></span>cle Ther<span class=\"_ _4\"></span>apeutics (the \u201cBicyc<span class=\"_ _4\"></span>le Collaboration Agreement\u201d<span class=\"ff1 ws34\">)<span class=\"_ _1\"></span>. Under this agreement,<span class=\"_ _4\"></span> </span>Bicyc<span class=\"_ _4\"></span>le is responsible for identifying Bicy<span class=\"_ _4\"></span>cle-peptides r<span class=\"_ _4\"></span>elated to the collaboration target,<span class=\"_ _1\"></span> human plasma kallikrein,<span class=\"_ _1\"></span> for use<span class=\"_ _3\"></span> in various indications. Oxurion is r<span class=\"_ _4\"></span>esponsible for further de<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>velopment and product commercialization after the defined researc<span class=\"_ _4\"></span>h screening is performed by Bicyc<span class=\"_ _4\"></span>le<span class=\"_ _4\"></span>. The collabor<span class=\"_ _4\"></span>ation includes two stages<span class=\"_ _4\"></span>. During Stage 1<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> which has been completed<span class=\"_ _1\"></span>, Bicy<span class=\"_ _4\"></span>cle w<span class=\"_ _4\"></span>as obligated to perform specific researc<span class=\"_ _4\"></span>h activities in accordance with the researc<span class=\"_ _4\"></span>h plan focused on scr<span class=\"_ _4\"></span>eening the target using the Bicyc<span class=\"_ _4\"></span>le platform to identify compounds that meet the criteria set by the parties. During Stage 2,<span class=\"_ _1\"></span> which is ongoing,<span class=\"_ _4\"></span> Oxurion has continued researc<span class=\"_ _4\"></span>h activities on selected Bicyc<span class=\"_ _4\"></span>le-peptides with the goal of identifying compounds for further develop<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>ment and commercialization. THR-149 has been selected as a development compound under the Bicyc<span class=\"_ _4\"></span>le Collaboration Agreement. Bicyc<span class=\"_ _4\"></span>le granted certain worldwide intellectual property rights to Oxurion for the development,<span class=\"_ _4\"></span> manuf<span class=\"_ _4\"></span>acture and commer<span class=\"_ _1\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>cialization of licensed compounds associated with plasma kallikrein. The Bicy<span class=\"_ _4\"></span>cle Collaboration Agr<span class=\"_ _4\"></span>eement pro<span class=\"_ _4\"></span>vided an upfront payment of 1<span class=\"_ _4\"></span>.0 million euro and potential ad<span class=\"_ _4\"></span>ditional researc<span class=\"_ _4\"></span>h and development funding,<span class=\"_ _4\"></span> at an agreed upon FTE rate<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> should the researc<span class=\"_ _4\"></span>h effort require more than one FTE<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> or the researc<span class=\"_ _4\"></span>h plan be amended or extended by Oxurion<span class=\"_ _1a9\"> </span>Oxurion is also required to make certain milestone payments<span class=\"_ _1a9\"> </span> Based on IAS 38 \u201cIntangible assets<span class=\"_ _1\"></span>\u201d, Oxurion has not<span class=\"_ _1a9\"> </span> to Bicyc<span class=\"_ _4\"></span>le upon the achievement of specified r<span class=\"_ _4\"></span>esearch,<span class=\"_ _1\"></span> de<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>acquired a separate intang<span class=\"_ _4\"></span>ible asset that meets the defini<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>velopment,<span class=\"_ _4\"></span> regulatory and commercial milestones of up to<span class=\"_ _1a9\"> </span> tion of IAS 38<span class=\"_ _1\"></span>, and ther<span class=\"_ _4\"></span>efore these expenses ar<span class=\"_ _4\"></span>e recorded<span class=\"_ _1a9\"> </span> 21 million euro  (e<span class=\"_ _4\"></span>.g.,<span class=\"_ _4\"></span> 3 million euro r<span class=\"_ _4\"></span>elated to the first Phase<span class=\"_ _1a9\"> </span> under R&amp;D expenses. So f<span class=\"_ _4\"></span>ar<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the follo<span class=\"_ _4\"></span>wing upfront and<span class=\"_ _1a9\"> </span> 3 trial if the Company decides to do one<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> and 5 million euro<span class=\"_ _3\"></span> milestones payments to Bicyc<span class=\"_ _4\"></span>le were r<span class=\"_ _4\"></span>ecognized: 1<span class=\"_ _4\"></span>.0 million<span class=\"_ _1a9\"> </span> when the first regulatory approval in either the United States<span class=\"_ _1a9\"> </span> euro in 2013<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 0<span class=\"_ _1\"></span>.750 million euro in 2017<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> 1.0 million <span class=\"_ _4\"></span>euro in<span class=\"_ _1a9\"> </span> or the European Union is granted for the fir<span class=\"_ _4\"></span>st indication)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> 2018 and 2.0 million in 2020<span class=\"_ _1\"></span>. These w<span class=\"_ _4\"></span>ere all expensed as<span class=\"_ _1a9\"> </span> R&amp;D costs.<span class=\"_ _1a9\"> </span>Under the terms of the Bicyc<span class=\"_ _4\"></span>le Collaboration Agreement,<span class=\"_ _1\"></span> to date Oxurion has paid milestones of approximatel<span class=\"_ _4\"></span>y 5<span class=\"_ _1a9\"> </span> Galapagos<span class=\"_ _1a9\"> </span>million euro<span class=\"_ _4\"></span>. In ad<span class=\"_ _4\"></span>dition,<span class=\"_ _4\"></span> to the extent an<span class=\"_ _4\"></span>y of the collabora<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tion products cover<span class=\"_ _4\"></span>ed by the licenses gr<span class=\"_ _4\"></span>anted to Oxurion<span class=\"_ _1a9\"> </span> Oxurion has entered into the Galapagos License<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> which is a<span class=\"_ _1a9\"> </span> are commercialized<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Bicycle <span class=\"_ _4\"></span>would be entitled to receive<span class=\"_ _1a9\"> </span> global and exclusive in-licensing agreement with Galapag<span class=\"_ _4\"></span>os<span class=\"_ _1a9\"> </span> tiered ro<span class=\"_ _4\"></span>yalty payments of mid-single digits based on a<span class=\"_ _1a9\"> </span> to develop and commercialize integrin antagonists for the<span class=\"_ _1a9\"> </span> percentage of net sales<span class=\"_ _4\"></span>. Royalty payments are subject to<span class=\"_ _1a9\"> </span> treatment of diabetic ey<span class=\"_ _4\"></span>e disease. T<span class=\"_ _4\"></span>he company\u2019<span class=\"_ _1\"></span>s THR-687<span class=\"_ _4\"></span> certain reductions. Also<span class=\"_ _1\"></span>, if Oxurion gr<span class=\"_ _4\"></span>ants a sublicense to<span class=\"_ _1a9\"> </span> asset for which development has been paused is a r<span class=\"_ _4\"></span>esult of<span class=\"_ _1a9\"> </span> a third party for rights to the program for non-ophthalmic<span class=\"_ _1a9\"> </span> this agreement. Oxurion has obtained the exclusive rights f<span class=\"_ _4\"></span>or<span class=\"_ _1a9\"> </span> use,<span class=\"_ _1\"></span> Bicycle w<span class=\"_ _4\"></span>ould be entitled to receive tier<span class=\"_ _4\"></span>ed payments<span class=\"_ _1a9\"> </span> the clinical development,<span class=\"_ _1\"></span> manufacturing and commercial<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>of mid-single digits to low-doub<span class=\"_ _4\"></span>le digits (no higher than first<span class=\"_ _1a9\"> </span> ization under this agreement,<span class=\"_ _1\"></span> while Galapagos is entitled to<span class=\"_ _3\"></span> quartile) based on a percentage of non-royalty sublicensing<span class=\"_ _1a9\"> </span> receive a non-refundab<span class=\"_ _4\"></span>le upfront fee for tec<span class=\"_ _4\"></span>hnolog<span class=\"_ _3\"></span>y access,<span class=\"_ _4\"></span> income. In line with IFRS princip<span class=\"_ _4\"></span>les,<span class=\"_ _1\"></span> no provisions have been<span class=\"_ _1a9\"> </span> development milestone payments of up to 12.5 million<span class=\"_ _1a9\"> </span> made in the Company\u2019<span class=\"_ _1\"></span>s books for these payments<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>euro (e<span class=\"_ _4\"></span>.g.,<span class=\"_ _4\"></span> 1<span class=\"_ _1\"></span>.5 million euro related to the first Phase 3 if the<span class=\"_ _1a9\"> </span> Company decides to do one<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> and 5 million euro when the<span class=\"_ _3\"></span> In November 2017<span class=\"_ _0\"></span>,<span class=\"_ _4\"></span> the parties entered into an amendment<span class=\"_ _3\"></span> first regulatory approval in either the United States or the<span class=\"_ _1a9\"> </span> to the Bicyc<span class=\"_ _4\"></span>le collaboration agreement. T<span class=\"_ _4\"></span>his amendment<span class=\"_ _1a9\"> </span> European Union is granted for the fir<span class=\"_ _4\"></span>st indication)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> provides f<span class=\"_ _4\"></span>or additional researc<span class=\"_ _4\"></span>h ser<span class=\"_ _3\"></span>vices to be per<span class=\"_ _3\"></span>formed<span class=\"_ _1a9\"> </span> by Bicy<span class=\"_ _4\"></span>cle related to the identification of ad<span class=\"_ _4\"></span>ditional Bicyc<span class=\"_ _4\"></span>le<span class=\"_ _1a9\"> </span> In addition,<span class=\"_ _1\"></span> to the extent any of the collaboration products<span class=\"_ _1a9\"> </span> peptides binding to the target for Oxurion,<span class=\"_ _1\"></span> in its discretion,<span class=\"_ _4\"></span> to<span class=\"_ _1a9\"> </span> cover<span class=\"_ _4\"></span>ed by the licenses granted to Oxurion ar<span class=\"_ _4\"></span>e commercial<span class=\"_ _4\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>select as development compounds. Bicy<span class=\"_ _4\"></span>cle w<span class=\"_ _4\"></span>as obligated to<span class=\"_ _1a9\"> </span> ized<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> Galapagos would be entitled to receive certain sales-<span class=\"_ _1a9\"> </span>perform the work in accordance with an amended researc<span class=\"_ _4\"></span>h<span class=\"_ _1a9\"> </span> based milestone payments and tiered ro<span class=\"_ _4\"></span>yalty payments of<span class=\"_ _1a9\"> </span> plan under Stage 1 of the collabor<span class=\"_ _4\"></span>ation and was funded at a<span class=\"_ _1a9\"> </span> mid-single digits based on a percentage of net sales,<span class=\"_ _1\"></span> except<span class=\"_ _1a9\"> </span> specified FTE rate<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> plus any direct out of pocket expenses<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and<span class=\"_ _1a9\"> </span> in the case of annual sales exceeding 500 million euro<span class=\"_ _1\"></span>, in<span class=\"_ _1a9\"> </span> Oxurion was r<span class=\"_ _4\"></span>esponsible for Stage 2 resear<span class=\"_ _4\"></span>ch and an<span class=\"_ _4\"></span>y de<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>which case the ro<span class=\"_ _4\"></span>yalty is higher<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span> velopment after the selection of a development compound<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> Bicyc<span class=\"_ _4\"></span>le has completed Stage 1 of the researc<span class=\"_ _4\"></span>h plan. Ad<span class=\"_ _4\"></span>ditional<span class=\"_ _1a9\"> </span> In September 2017<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> the par<span class=\"_ _3\"></span>ties entered into an amendment<span class=\"_ _1a9\"> </span> milestones wer<span class=\"_ _4\"></span>e added for the potential additional licensed<span class=\"_ _1a9\"> </span> to the Galapagos License Agreement. Accor<span class=\"_ _4\"></span>ding to this<span class=\"_ _1a9\"> </span> compounds,<span class=\"_ _1\"></span> consistent with those of the initial Bicycle<span class=\"_ _1a9\"> </span> amendment,<span class=\"_ _4\"></span> Oxurion has taken o<span class=\"_ _4\"></span>ver the prosecution and<span class=\"_ _1a9\"> </span> Collaboration Agr<span class=\"_ _4\"></span>eement. This does not impact THR-149<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>maintenance of the licensed patents and consequently has<span class=\"_ _1a9\"> </span> acquired all rights in the licensed patents with effective date<span class=\"_ _1a9\"> </span> as of September 25<span class=\"_ _1\"></span>, 2017<span class=\"_ _25\"></span>. Oxurion will be entitled to deduct<span class=\"_ _1a9\"> </span> its documented and reasonable costs f<span class=\"_ _4\"></span>or prosecution and<span class=\"_ _1a9\"> </span>maintenance for the licensed patents from the ro<span class=\"_ _4\"></span>yalty due and payable to Galapagos under the Galapagos License Agreement. In line with IFRS principles<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> no pro<span class=\"_ _4\"></span>visions have been made in the Company\u2019<span class=\"_ _1\"></span>s books for these payments<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Oxurion has paid to Galapagos an upfront fee of 1<span class=\"_ _1\"></span>.0 million<span class=\"_ _3\"></span> euro in April 2016<span class=\"_ _25\"></span>, upon Galapagos supp<span class=\"_ _4\"></span>lying to Oxurion the licensed compounds,<span class=\"_ _1\"></span> including THR-687<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> and all data and manufacturing kno<span class=\"_ _4\"></span>w-how related to the licensed compounds,<span class=\"_ _1\"></span> which was capitalized as an intangible asset as it meets the conditions of a separately acquir<span class=\"_ _4\"></span>ed intan<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>gible asset under IAS 38<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> par<span class=\"_ _1\"></span>. 25<span class=\"_ _1\"></span>. Galapagos has no fur<span class=\"_ _3\"></span>ther performance obligations for development ser<span class=\"_ _3\"></span>vices. Since no commercialization was ac<span class=\"_ _4\"></span>hieved and no profit was generated<span class=\"_ _1\"></span>, no amortization was r<span class=\"_ _4\"></span>ecorded so far<span class=\"_ _1\"></span>. Until now<span class=\"_ _25\"></span>, no other advance payments have been made to Galapagos<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>In the first half of 2022,<span class=\"_ _4\"></span> the Galapagos license w<span class=\"_ _4\"></span>as fully impaired (1 million euro) given the announcement that Oxurion has decided not to advance THR-687<span class=\"_ _1\"></span> to par<span class=\"_ _3\"></span>t B of<span class=\"_ _3\"></span> the INTEGRAL trial.<span class=\"_ _1a9\"> </span>The future milestones m<span class=\"_ _4\"></span>ust be assessed to determine if they meet the capitalization criteria under IAS 38<span class=\"_ _1\"></span>, once they are paid<span class=\"_ _1\"></span>. We r<span class=\"_ _4\"></span>efer to the accounting policy section on intan<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>gible assets for mor<span class=\"_ _4\"></span>e details.<span class=\"_ _1a9\"> </span>Clinical T<span class=\"_ _25\"></span>rial Agreement<span class=\"_ _1a9\"> </span>Syneos Health<span class=\"_ _1a9\"> </span>Syneos Health (<span class=\"ff3 ws0\">\u201cSyneos<span class=\"_ _1\"></span>\u201d<span class=\"ff1 ws269\">) provides clinical r<span class=\"_ _4\"></span>esearch </span></span>ser<span class=\"_ _3\"></span>vices for the development of THR-149<span class=\"_ _1\"></span>. Ser<span class=\"_ _3\"></span>vices are billed on a project basis by w<span class=\"_ _4\"></span>ay of work or<span class=\"_ _4\"></span>ders (<span class=\"ff3 ws0\">\u201cW<span class=\"_ _4\"></span>ork </span>Orders<span class=\"_ _4\"></span>\u201d<span class=\"ff1 ws26a\">) enter<span class=\"_ _4\"></span>ed into based on a Master Ser<span class=\"_ _3\"></span>vices </span>Agreement (the <span class=\"ff3 ws0\">\u201cMSA<span class=\"_ _0\"></span>\u201d<span class=\"ff1 ws10b\">) for Clinical Research and Related </span></span>Ser<span class=\"_ _3\"></span>vices dated as of August 19<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2016<span class=\"_ _25\"></span>.   The MSA obligates the parties to use commercially rea<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>sonable efforts to progress the study in a timely manner and to meet any timelines for stud<span class=\"_ _4\"></span>y milestones and target dates applying prof<span class=\"_ _4\"></span>essional standards consistent with GCP and in adherence to applicab<span class=\"_ _4\"></span>le laws and regulations<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The major study milestones and target dates ar<span class=\"_ _4\"></span>e described in the binding W<span class=\"_ _4\"></span>ork Orders that ar<span class=\"_ _4\"></span>e entered into under the MSA. Subject to mutually agreed c<span class=\"_ _4\"></span>hange orders,<span class=\"_ _1\"></span> the W<span class=\"_ _4\"></span>ork Order constitutes a binding agreement,<span class=\"_ _1\"></span> and the par<span class=\"_ _3\"></span>ties are obligated to use commer<span class=\"_ _4\"></span>cially reasonable eff<span class=\"_ _4\"></span>orts to comply with the timelines and b<span class=\"_ _4\"></span>udgets set in the W<span class=\"_ _4\"></span>ork Orders,<span class=\"_ _1\"></span> unless a change order is agreed<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The W<span class=\"_ _4\"></span>ork Order f<span class=\"_ _4\"></span>or THR-149 specifies the basic parame<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ters of the THR -149 study<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> including,<span class=\"_ _1\"></span> without limitation, <span class=\"_ _4\"></span>the scope of work,<span class=\"_ _1\"></span> study-specific assumptions,<span class=\"_ _4\"></span> estimated time period for completing services,<span class=\"_ _4\"></span> estimated budget,<span class=\"_ _1\"></span> payment and currency sc<span class=\"_ _4\"></span>hedules,<span class=\"_ _1\"></span> resource allocation and/or<span class=\"_ _1\"></span>, as ap<span class=\"_ _4\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>plicable<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> other specific ser<span class=\"_ _23\"></span>vices to be performed by Syneos<span class=\"_ _4\"></span>. <span class=\"_ _190\"></span> The budget contained in the THR-149 W<span class=\"_ _1\"></span>ork Order can be changed b<span class=\"_ _4\"></span>y way of a change or<span class=\"_ _4\"></span>der if there are c<span class=\"_ _4\"></span>hanges in the scope of the work or the assumptions underl<span class=\"_ _4\"></span>ying the W<span class=\"_ _4\"></span>ork Order<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> pro<span class=\"_ _4\"></span>vided that the change or<span class=\"_ _4\"></span>der must be agreed betw<span class=\"_ _4\"></span>een the parties.<span class=\"_ _1a9\"> </span>Syneos also pro<span class=\"_ _4\"></span>vided ser<span class=\"_ _3\"></span>vices for the INTEGRAL study of THR-687<span class=\"_ _4\"></span> in treatment na\u00efve patients<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> whic<span class=\"_ _4\"></span>h has been terminated and is in the process of being wound do<span class=\"_ _4\"></span>wn pursuant to the terms of the W<span class=\"_ _4\"></span>ork Order f<span class=\"_ _4\"></span>or THR-687<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>Based on IAS 38 \u201cIntangible assets<span class=\"_ _1\"></span>\u201d, the costs paid to Syneos Health are not made in or<span class=\"_ _4\"></span>der to acquire an asset,<span class=\"_ _1\"></span> or to increase economic benefits alread<span class=\"_ _4\"></span>y embodied into an asset. Rather<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> they are an outsourced R&amp;D cost. T<span class=\"_ _4\"></span>herefor<span class=\"_ _4\"></span>e,<span class=\"_ _1\"></span> such costs are expensed to the statement of pr<span class=\"_ _4\"></span>ofit and loss as R&amp;D expenses,<span class=\"_ _1\"></span> as incurred<span class=\"_ _4\"></span>. In case of prepayments<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> an asset is recognized for suc<span class=\"_ _4\"></span>h prepayment,<span class=\"_ _1\"></span> and prepay<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ment is released to statement of profit and loss as costs are incurr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>. In 2022 and 2021<span class=\"_ _1\"></span>, 7<span class=\"_ _25\"></span>.4 million euro and 6<span class=\"_ _25\"></span>.5<span class=\"_ _1a9\"> </span>million euro wer<span class=\"_ _4\"></span>e paid respectively to S<span class=\"_ _4\"></span>yneos Health and<span class=\"_ _1a9\"> </span> F<span class=\"_ _1\"></span>or 2022,<span class=\"_ _4\"></span> Oxurion paid 0<span class=\"_ _1\"></span>.067<span class=\"_ _4\"></span> million euro (2021: 0<span class=\"_ _25\"></span>.072<span class=\"_ _1a9\"> </span> recognized as R&amp;D expenses<span class=\"_ _4\"></span>. At y<span class=\"_ _4\"></span>ear<span class=\"_ _1\"></span>-end 2022,<span class=\"_ _4\"></span> a prepay<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>million euro) for distribution costs<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 0<span class=\"_ _25\"></span>.204 million euro (2021:<span class=\"_ _1a9\"> </span> ment in the amount of .2.3 million euro is recorded on the<span class=\"_ _1a9\"> </span> 0<span class=\"_ _1\"></span>.225 million euro) for selling expenses and received<span class=\"_ _1a9\"> </span> statement of profit and loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>0<span class=\"_ _1\"></span>.403 million euro (2021: 0<span class=\"_ _1\"></span>.588 million euro) reven<span class=\"_ _4\"></span>ue for<span class=\"_ _1a9\"> </span> the select number of markets ser<span class=\"_ _3\"></span>ved by Eumedica.<span class=\"_ _1a9\"> </span>License,<span class=\"_ _1\"></span> Development and Commercial Agreement<span class=\"_ _1a9\"> </span>On March 12,<span class=\"_ _1\"></span> 2020<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion entered into an exclusive<span class=\"_ _1a9\"> </span> Eumedica and Inceptua<span class=\"_ _1a9\"> </span>license with Inceptua for the commercialization and<span class=\"_ _1a9\"> </span> marketing of JETREA\u00ae outside of the US in certain transfer<span class=\"_ _1a9\"> </span> In June 2018<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion and Eumedica entered into an<span class=\"_ _1a9\"> </span> countries. T<span class=\"_ _25\"></span>ransfer countries include all countries of the<span class=\"_ _1a9\"> </span> exclusive commercial agr<span class=\"_ _4\"></span>eement,<span class=\"_ _4\"></span> pursuant to whic<span class=\"_ _4\"></span>h<span class=\"_ _1a9\"> </span> European Union,<span class=\"_ _4\"></span> Norway<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> Liechtenstein,<span class=\"_ _1\"></span> Switzerland,<span class=\"_ _1\"></span> the<span class=\"_ _1a9\"> </span> Eumedica agreed to pro<span class=\"_ _4\"></span>vide distribution services for<span class=\"_ _1a9\"> </span> UK and Australia and sales may also be made in non-ap<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>JETREA\u00ae (the <span class=\"ff3 wsa4\">\u201c2018 Agreement\u201d</span>)<span class=\"_ _1\"></span>. Eumedica acts as an<span class=\"_ _1a9\"> </span> proved countries on a named patient basis under r<span class=\"_ _4\"></span>espect<span class=\"_ _1a9\"> </span> agent of Oxurion,<span class=\"_ _4\"></span> as Oxurion takes primary responsibility<span class=\"_ _1a9\"> </span> of applicable la<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>. The parties fur<span class=\"_ _3\"></span>ther agreed that Oxurion<span class=\"_ _1a9\"> </span> for product quality<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> inventory risk,<span class=\"_ _4\"></span> and has discretion in es<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>would withdr<span class=\"_ _4\"></span>aw the marketing authorizations in the US<span class=\"_ _1a9\"> </span> tablishing the sales price<span class=\"_ _4\"></span>. The arr<span class=\"_ _4\"></span>angement has the char<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>and Canada and would tr<span class=\"_ _4\"></span>ansfer the EMEA marketing au<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>acteristics of a consignment where Eumedica does not<span class=\"_ _1a9\"> </span> thorization to Inceptua. The license became effective on<span class=\"_ _1a9\"> </span> have control of the pr<span class=\"_ _4\"></span>oduct,<span class=\"_ _4\"></span> and Oxurion can direct its use<span class=\"_ _1a9\"> </span> September 15<span class=\"_ _1\"></span>, 2020<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> when the EMEA market authoriza<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>and ask for its return. Eumedica collects payments fr<span class=\"_ _4\"></span>om<span class=\"_ _1a9\"> </span> tion was tr<span class=\"_ _4\"></span>ansferred<span class=\"_ _1\"></span>. Under the terms of the agreement,<span class=\"_ _4\"></span> end-customers for Oxurion. Eumedica char<span class=\"_ _4\"></span>ges a monthly<span class=\"_ _1a9\"> </span> Inceptua purchases JETREA\u00ae fr<span class=\"_ _4\"></span>om Oxurion in final product<span class=\"_ _1a9\"> </span> distribution fee that co<span class=\"_ _4\"></span>vers the ser<span class=\"_ _3\"></span>vices provided inc<span class=\"_ _4\"></span>luding<span class=\"_ _1a9\"> </span> form for a fixed amount per vial and pays Oxurion a market<span class=\"_ _1a9\"> </span> customer ser<span class=\"_ _3\"></span>vice,<span class=\"_ _1\"></span> shipment preparation,<span class=\"_ _4\"></span> packag<span class=\"_ _4\"></span>ing,<span class=\"_ _4\"></span> rate ro<span class=\"_ _4\"></span>yalty on sales based on quarterly royalty reports.<span class=\"_ _1a9\"> </span> storage<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> labeling/r<span class=\"_ _4\"></span>epackaging,<span class=\"_ _4\"></span> administr<span class=\"_ _4\"></span>ation,<span class=\"_ _4\"></span> destruction<span class=\"_ _1a9\"> </span> &amp; waste handling,<span class=\"_ _4\"></span> etc<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> As a result of its agreement with Inceptua,<span class=\"_ _1\"></span> Oxurion entered<span class=\"_ _1a9\"> </span> into a tripartite agreement with Eumedica and Inceptua<span class=\"_ _1a9\"> </span> Under IFRS 15<span class=\"_ _1\"></span>, Oxurion has onl<span class=\"_ _4\"></span>y one performance obliga<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>pursuant to which Eumedica pr<span class=\"_ _4\"></span>ovides certain packaging,<span class=\"_ _4\"></span> tion,<span class=\"_ _4\"></span> which is to deliver the pr<span class=\"_ _4\"></span>oduct to the end-customer<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span> labelling and storage ser<span class=\"_ _3\"></span>vices directly to Oxurion and<span class=\"_ _1a9\"> </span> This performance obligation is satisfied when Eumedica<span class=\"_ _1a9\"> </span> purchases the finished pr<span class=\"_ _4\"></span>oduct from Oxurion and sells its<span class=\"_ _1a9\"> </span> transfers (deliver<span class=\"_ _4\"></span>s) the product to the end-customer<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> as this<span class=\"_ _1a9\"> </span> to Inceptua (the <span class=\"ff3 ws12e\">\u201cT<span class=\"_ _25\"></span>ripar<span class=\"_ _3\"></span>tite Agreement\u201d<span class=\"ff1 ws125\">)<span class=\"_ _4\"></span>. The T<span class=\"_ _25\"></span>ripar<span class=\"_ _3\"></span>tite<span class=\"_ _1a9\"> </span></span></span><span class=\"ff3 ws12e\"><span class=\"ff1 ws125\"> </span></span>is the moment when the customer obtains control o<span class=\"_ _4\"></span>ver the<span class=\"_ _1a9\"> </span> Agreement rep<span class=\"_ _4\"></span>laces the 2018 Agreement. Eumedica also<span class=\"_ _1a9\"> </span> product. Ther<span class=\"_ _4\"></span>efore<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> r<span class=\"_ _4\"></span>evenue is recognized for the price of<span class=\"_ _1a9\"> </span> provides certain ser<span class=\"_ _3\"></span>vices to Oxurion on behalf of Inceptua,<span class=\"_ _4\"></span> the product at the point in time when it is delivered b<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span> including storage<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> customer ser<span class=\"_ _23\"></span>vices and deliver<span class=\"_ _3\"></span>y<span class=\"_ _1\"></span>,<span class=\"_ _1\"></span> which<span class=\"_ _1a9\"> </span> Eumedica to the end-customer<span class=\"_ _1\"></span>. While inventor<span class=\"_ _3\"></span>y is located<span class=\"_ _1a9\"> </span> are re-c<span class=\"_ _4\"></span>harged to Inceptua.<span class=\"_ _1a9\"> </span> at Eumedica,<span class=\"_ _4\"></span> it is recognized as in<span class=\"_ _4\"></span>ventor<span class=\"_ _3\"></span>y of Oxurion due to<span class=\"_ _1a9\"> </span> consignment terms. Eumedica f<span class=\"_ _4\"></span>ees are recognized partly<span class=\"_ _1a9\"> </span> After a transition period which w<span class=\"_ _4\"></span>as completed in December<span class=\"_ _1a9\"> </span> under distribution costs and partly under selling expenses,<span class=\"_ _4\"></span> 2020<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s obligations under the T<span class=\"_ _25\"></span>ripar<span class=\"_ _3\"></span>tite Agreement<span class=\"_ _1a9\"> </span> as they are char<span class=\"_ _4\"></span>ged on a monthly basis.<span class=\"_ _1a9\"> </span>will be limited to supply of the JETREA\u00ae pr<span class=\"_ _4\"></span>oduct to<span class=\"_ _1a9\"> </span> Inceptua until 2023<span class=\"_ _1\"></span>. All other activities related to JETREA\u00ae<span class=\"_ _1a9\"> </span> will be transferr<span class=\"_ _4\"></span>ed to Inceptua or will cease<span class=\"_ _1a9\"> </span>Under IFRS 15<span class=\"_ _1\"></span>, Oxurion<span class=\"_ _1\"></span>\u2019<span class=\"_ _4\"></span>s only performance obligation is to deliver final products to Inceptua. This ob<span class=\"_ _4\"></span>ligation is completed when Eumedica sells the products to Inceptua. Oxurion therefor<span class=\"_ _4\"></span>e recognizes the reven<span class=\"_ _4\"></span>ue from the sale of the goods when the assets are sold b<span class=\"_ _4\"></span>y Eumedica to Inceptua. Royalties ar<span class=\"_ _4\"></span>e recognised quarterly upon reception of royalty r<span class=\"_ _4\"></span>eport from Inceptua.<span class=\"_ _1a9\"> </span>Oxurion received 0<span class=\"_ _25\"></span>.153 million euro royalties (2021: 0<span class=\"_ _1\"></span>.159 million euro) for the select number of markets served by Inceptua.<span class=\"_ _1a9\"> </span>Academic Agreements<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y has concluded agreements with various academic institutions that are interested in the stud<span class=\"_ _4\"></span>y of drug candidates,<span class=\"_ _1\"></span> including the following:<span class=\"_ _1a9\"> </span>Flanders Institute for Biotechno<span class=\"_ _4\"></span>log<span class=\"_ _3\"></span>y<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y has entered into several agr<span class=\"_ _4\"></span>eements with the V<span class=\"_ _4\"></span>esalius Researc<span class=\"_ _4\"></span>h Centre (former<span class=\"_ _4\"></span>ly the Dept. of T<span class=\"_ _25\"></span>ransgene T<span class=\"_ _1\"></span>echnology and Gene Therapy)<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> a department of VIB<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> relating to the preclinical char<span class=\"_ _4\"></span>acterization of two of the programs under license with the V<span class=\"_ _1\"></span>esalius Research Centre<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> i.e<span class=\"_ _4\"></span>.,<span class=\"_ _1\"></span> Anti-PlGF and PlGF<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>On December 12,<span class=\"_ _4\"></span> 2017<span class=\"_ _0\"></span>, Oncurious and VIB enter<span class=\"_ _4\"></span>ed into a researc<span class=\"_ _4\"></span>h collaboration and license agreement on the basis of which Oncurious acquired exc<span class=\"_ _4\"></span>lusive licenses on a portfolio of five unique next generation immuno-oncology assets,<span class=\"_ _1\"></span> based on seminal work originating from the VIB-KU Leuven labs of Massimiliano Mazzone and Gabriele Bergers,<span class=\"_ _1\"></span> and from the VIB-<span class=\"_ _1\"></span>VUB lab of Jo V<span class=\"_ _1\"></span>an Ginderachter<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>In the context of the abovementioned r<span class=\"_ _4\"></span>esearch collabor<span class=\"_ _4\"></span>a<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion and license agreement,<span class=\"_ _1\"></span> VIB has been granted two call options from Oxurion for an aggregate maximum of 1<span class=\"_ _4\"></span>,230 shares in Oncurious,<span class=\"_ _1\"></span> subject to the achievement of certain milestones linked to the achievement of one or tw<span class=\"_ _4\"></span>o proof of concepts (call option agreement of December 12,<span class=\"_ _1\"></span> 2017). On October 22,<span class=\"_ _4\"></span> 2021<span class=\"_ _1\"></span>, Oncurious announced the ac<span class=\"_ _4\"></span>hieve<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ment of a second preclinical pr<span class=\"_ _4\"></span>oof of concept for its im<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>muno-oncology program aimed at depleting regulatory T cells (T<span class=\"_ _25\"></span>regs) by targeting C-C motif chemokine r<span class=\"_ _4\"></span>eceptor 8 (CCR8)<span class=\"_ _4\"></span>. Consequently<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> at y<span class=\"_ _4\"></span>ear end 2021<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> VIB is entitled to execute its remaining call option of 550 shares<span class=\"_ _4\"></span>. P<span class=\"_ _4\"></span>ost-<span class=\"_ _1a9\"> </span>closing VIB indicated it is executing this remaining call option in full.<span class=\"_ _1a9\"> </span>As per June 30<span class=\"_ _25\"></span>, 2021<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the VIB IP license has been impaired<span class=\"_ _1\"></span>, compared with a net carrying amount of 1.127<span class=\"_ _1\"></span> million euro in 2020<span class=\"_ _1\"></span>. During 2021<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> Oxurion has paid 0<span class=\"_ _1\"></span>.211 million euro of R&amp;D costs respectively to VIB in r<span class=\"_ _4\"></span>elation to this research program. On September 28<span class=\"_ _1\"></span>, 2022,<span class=\"_ _1\"></span> Oncurious entered into an agreement with VIB concerning the assignment of intellec<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tual property rights and know-how<span class=\"_ _25\"></span>, and the termination of certain licenses. The assignment concerns Oncurious<span class=\"_ _1\"></span>\u2019 C-C motif chemokine r<span class=\"_ _4\"></span>eceptor 8 (CCR8) program,<span class=\"_ _1\"></span> as well as other undisclosed assets<span class=\"_ _4\"></span>. The assignment does not include Oncurious<span class=\"_ _4\"></span>\u2019 TB-403 asset. The agr<span class=\"_ _4\"></span>eement was conc<span class=\"_ _4\"></span>luded follo<span class=\"_ _4\"></span>wing the decision of Oncurious not to further invest in the foreground tec<span class=\"_ _4\"></span>hnology of several discover<span class=\"_ _3\"></span>y stage and preclinical pr<span class=\"_ _4\"></span>ograms<span class=\"_ _4\"></span>. In consideration of Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s contri<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>butions to<span class=\"_ _4\"></span>wards the development of for<span class=\"_ _4\"></span>eground techno<span class=\"_ _4\"></span>l<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>og<span class=\"_ _3\"></span>y by Oncurious,<span class=\"_ _1\"></span> prior to Oncurious<span class=\"_ _4\"></span>\u2019 abandonment and assignment to VIB thereof<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the parties agreed on a revenue sharing agreement with Oxurion upon VIB\u2019<span class=\"_ _1\"></span>s valorization of such for<span class=\"_ _4\"></span>eground technology<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>On December 14<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _1\"></span> Oxurion purchased 2,018 shares in Oncurious from VIB for 1 euro<span class=\"_ _1a9\"> </span><span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Other Commitments<span class=\"_ _1a9\"> </span>Research and development commitments<span class=\"_ _1a9\"> </span>At December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022,<span class=\"_ _4\"></span> the Group had commitments<span class=\"_ _1a9\"> </span>outstanding in the context of researc<span class=\"_ _4\"></span>h and development<span class=\"_ _1a9\"> </span>agreements amounting to 11<span class=\"_ _1\"></span>.0 million euro compared to<span class=\"_ _1a9\"> </span>18<span class=\"_ _1\"></span>.0 million euro in 2021<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> payable o<span class=\"_ _4\"></span>ver the course of the<span class=\"_ _1a9\"> </span>follo<span class=\"_ _4\"></span>wing twelve months to various resear<span class=\"_ _4\"></span>ch subcontrac<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tors,<span class=\"_ _1\"></span> but primarily to Syneos<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Contingent liability<span class=\"_ _1a9\"> </span>The expenses incurr<span class=\"_ _4\"></span>ed in several of the Group<span class=\"_ _1\"></span>\u2019<span class=\"_ _1\"></span>s research<span class=\"_ _1a9\"> </span>and development programs ha<span class=\"_ _4\"></span>ve been reimbursed b<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span>VLAIO<span class=\"_ _25\"></span>, former<span class=\"_ _4\"></span>ly known as IWT<span class=\"_ _0\"></span>, as a g<span class=\"_ _4\"></span>overnment grant.<span class=\"_ _1a9\"> </span>Contracts with VLAIO generall<span class=\"_ _4\"></span>y include a clause that<span class=\"_ _1a9\"> </span>defines the need for validation of the project results in<span class=\"_ _1a9\"> </span>order for the grant to be eff<span class=\"_ _4\"></span>ectively earned<span class=\"_ _4\"></span>. Should this<span class=\"_ _1a9\"> </span>validation not occur<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> VLAIO has the right to reclaim the<span class=\"_ _1a9\"> </span>funds previously gr<span class=\"_ _4\"></span>anted<span class=\"_ _4\"></span>. The Gr<span class=\"_ _4\"></span>oup considers this as a<span class=\"_ _1a9\"> </span>remote possibility<span class=\"_ _25\"></span>. Please refer to the accounting policy<span class=\"_ _1a9\"> </span>described in section 5<span class=\"_ _1\"></span>.5<span class=\"_ _4\"></span>.3 (G) and the rationale used in<span class=\"_ _1a9\"> </span>order to recognize gr<span class=\"_ _4\"></span>ant income over the course of the<span class=\"_ _1a9\"> </span>project. T<span class=\"_ _25\"></span>otal amounts received in 2021 with respect to<span class=\"_ _1a9\"> </span>government gr<span class=\"_ _4\"></span>ants from VLAIO amount to 0<span class=\"_ _1\"></span>.228 million<span class=\"_ _1a9\"> </span>euro<span class=\"_ _4\"></span>. No amounts w<span class=\"_ _4\"></span>ere r<span class=\"_ _4\"></span>eceived in 2022.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCommitmentsAndContingentLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-79": {
   "value": "Key Agreements,<span class=\"_ _1\"></span> Commitments and Contingent Liabilities<span class=\"_ _1a9\"> </span>In addition to the convertible loan agreements described in the preceding section,<span class=\"_ _1\"></span> the Group has a number of other material agreements with third parties. Please find below an o<span class=\"_ _4\"></span>ver<span class=\"_ _3\"></span>view of Oxurion\u2019<span class=\"_ _25\"></span>s material agree<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>ments. An agr<span class=\"_ _4\"></span>eement is considered as \u201cmaterial<span class=\"_ _4\"></span>\u201d when the contractual commitments reac<span class=\"_ _4\"></span>h over 1 million euro<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> or in case of a new agreement,<span class=\"_ _1\"></span> when such an impact is expected in the twelve-month period after the r<span class=\"_ _4\"></span>eporting date.<span class=\"_ _1a9\"> </span>Note that certain agreements may include sharing of R&amp;D costs and/or sharing of revenue<span class=\"_ _4\"></span>. Although these agreements may include the establishment of a joint committee whic<span class=\"_ _4\"></span>h monitors the joint activities,<span class=\"_ _1\"></span> these arrangements are out of the scope of IFRS 11 \u201cJoint Arr<span class=\"_ _4\"></span>angements<span class=\"_ _4\"></span>\u201d,<span class=\"_ _4\"></span> as the Compan<span class=\"_ _4\"></span>y has concluded that no joint control exists<span class=\"_ _4\"></span>. The main indica<span class=\"_ _4\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tors found in the multip<span class=\"_ _4\"></span>le arrangements that resulted in the conclusion that Oxurion has control o<span class=\"_ _4\"></span>ver the operations and relevant activities and theref<span class=\"_ _4\"></span>ore is the decision-making party in the agreements are as f<span class=\"_ _4\"></span>ollows:<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws265\">Oxurion has sole and exclusive decision-making </span>authority on the development activities,<span class=\"_ _1\"></span> including but not limited to the development plan.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws72\">Oxurion bears the costs and expenses for all activities </span>under the development plan.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws1a1\">Oxurion is responsible for preparing,<span class=\"_ _1\"></span> filing and main<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></span>taining regulator<span class=\"_ _3\"></span>y approvals<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"wsa4\">Oxurion has the sole responsibility and decision-mak<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span></span>ing authority for manufacturing and commercialization.<span class=\"_ _1a9\"> </span>\u2022 <span class=\"_ _62\"> </span><span class=\"ws1d\">Oxurion shall be the sole and exclusive owner of all </span>intellectual property in most agreements<span class=\"_ _1a9\"> </span>.<span class=\"_ _1a9\"> </span>Research and Development Agr<span class=\"_ _4\"></span>eements<span class=\"_ _1a9\"> </span>Bicycle Ther<span class=\"_ _4\"></span>apeutics<span class=\"_ _1a9\"> </span>In August 2013<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion entered into a resear<span class=\"_ _4\"></span>ch collabor<span class=\"_ _4\"></span>a<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tion and license agreement with Bicy<span class=\"_ _4\"></span>cle Ther<span class=\"_ _4\"></span>apeutics (the \u201cBicyc<span class=\"_ _4\"></span>le Collaboration Agreement\u201d<span class=\"ff1 ws34\">)<span class=\"_ _1\"></span>. Under this agreement,<span class=\"_ _4\"></span> </span>Bicyc<span class=\"_ _4\"></span>le is responsible for identifying Bicy<span class=\"_ _4\"></span>cle-peptides r<span class=\"_ _4\"></span>elated to the collaboration target,<span class=\"_ _1\"></span> human plasma kallikrein,<span class=\"_ _1\"></span> for use<span class=\"_ _3\"></span> in various indications. Oxurion is r<span class=\"_ _4\"></span>esponsible for further de<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>velopment and product commercialization after the defined researc<span class=\"_ _4\"></span>h screening is performed by Bicyc<span class=\"_ _4\"></span>le<span class=\"_ _4\"></span>. The collabor<span class=\"_ _4\"></span>ation includes two stages<span class=\"_ _4\"></span>. During Stage 1<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> which has been completed<span class=\"_ _1\"></span>, Bicy<span class=\"_ _4\"></span>cle w<span class=\"_ _4\"></span>as obligated to perform specific researc<span class=\"_ _4\"></span>h activities in accordance with the researc<span class=\"_ _4\"></span>h plan focused on scr<span class=\"_ _4\"></span>eening the target using the Bicyc<span class=\"_ _4\"></span>le platform to identify compounds that meet the criteria set by the parties. During Stage 2,<span class=\"_ _1\"></span> which is ongoing,<span class=\"_ _4\"></span> Oxurion has continued researc<span class=\"_ _4\"></span>h activities on selected Bicyc<span class=\"_ _4\"></span>le-peptides with the goal of identifying compounds for further develop<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>ment and commercialization. THR-149 has been selected as a development compound under the Bicyc<span class=\"_ _4\"></span>le Collaboration Agreement. Bicyc<span class=\"_ _4\"></span>le granted certain worldwide intellectual property rights to Oxurion for the development,<span class=\"_ _4\"></span> manuf<span class=\"_ _4\"></span>acture and commer<span class=\"_ _1\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>cialization of licensed compounds associated with plasma kallikrein. The Bicy<span class=\"_ _4\"></span>cle Collaboration Agr<span class=\"_ _4\"></span>eement pro<span class=\"_ _4\"></span>vided an upfront payment of 1<span class=\"_ _4\"></span>.0 million euro and potential ad<span class=\"_ _4\"></span>ditional researc<span class=\"_ _4\"></span>h and development funding,<span class=\"_ _4\"></span> at an agreed upon FTE rate<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> should the researc<span class=\"_ _4\"></span>h effort require more than one FTE<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> or the researc<span class=\"_ _4\"></span>h plan be amended or extended by Oxurion<span class=\"_ _1a9\"> </span>Oxurion is also required to make certain milestone payments<span class=\"_ _1a9\"> </span> Based on IAS 38 \u201cIntangible assets<span class=\"_ _1\"></span>\u201d, Oxurion has not<span class=\"_ _1a9\"> </span> to Bicyc<span class=\"_ _4\"></span>le upon the achievement of specified r<span class=\"_ _4\"></span>esearch,<span class=\"_ _1\"></span> de<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>acquired a separate intang<span class=\"_ _4\"></span>ible asset that meets the defini<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>velopment,<span class=\"_ _4\"></span> regulatory and commercial milestones of up to<span class=\"_ _1a9\"> </span> tion of IAS 38<span class=\"_ _1\"></span>, and ther<span class=\"_ _4\"></span>efore these expenses ar<span class=\"_ _4\"></span>e recorded<span class=\"_ _1a9\"> </span> 21 million euro  (e<span class=\"_ _4\"></span>.g.,<span class=\"_ _4\"></span> 3 million euro r<span class=\"_ _4\"></span>elated to the first Phase<span class=\"_ _1a9\"> </span> under R&amp;D expenses. So f<span class=\"_ _4\"></span>ar<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the follo<span class=\"_ _4\"></span>wing upfront and<span class=\"_ _1a9\"> </span> 3 trial if the Company decides to do one<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> and 5 million euro<span class=\"_ _3\"></span> milestones payments to Bicyc<span class=\"_ _4\"></span>le were r<span class=\"_ _4\"></span>ecognized: 1<span class=\"_ _4\"></span>.0 million<span class=\"_ _1a9\"> </span> when the first regulatory approval in either the United States<span class=\"_ _1a9\"> </span> euro in 2013<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 0<span class=\"_ _1\"></span>.750 million euro in 2017<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> 1.0 million <span class=\"_ _4\"></span>euro in<span class=\"_ _1a9\"> </span> or the European Union is granted for the fir<span class=\"_ _4\"></span>st indication)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> 2018 and 2.0 million in 2020<span class=\"_ _1\"></span>. These w<span class=\"_ _4\"></span>ere all expensed as<span class=\"_ _1a9\"> </span> R&amp;D costs.<span class=\"_ _1a9\"> </span>Under the terms of the Bicyc<span class=\"_ _4\"></span>le Collaboration Agreement,<span class=\"_ _1\"></span> to date Oxurion has paid milestones of approximatel<span class=\"_ _4\"></span>y 5<span class=\"_ _1a9\"> </span> Galapagos<span class=\"_ _1a9\"> </span>million euro<span class=\"_ _4\"></span>. In ad<span class=\"_ _4\"></span>dition,<span class=\"_ _4\"></span> to the extent an<span class=\"_ _4\"></span>y of the collabora<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>tion products cover<span class=\"_ _4\"></span>ed by the licenses gr<span class=\"_ _4\"></span>anted to Oxurion<span class=\"_ _1a9\"> </span> Oxurion has entered into the Galapagos License<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> which is a<span class=\"_ _1a9\"> </span> are commercialized<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Bicycle <span class=\"_ _4\"></span>would be entitled to receive<span class=\"_ _1a9\"> </span> global and exclusive in-licensing agreement with Galapag<span class=\"_ _4\"></span>os<span class=\"_ _1a9\"> </span> tiered ro<span class=\"_ _4\"></span>yalty payments of mid-single digits based on a<span class=\"_ _1a9\"> </span> to develop and commercialize integrin antagonists for the<span class=\"_ _1a9\"> </span> percentage of net sales<span class=\"_ _4\"></span>. Royalty payments are subject to<span class=\"_ _1a9\"> </span> treatment of diabetic ey<span class=\"_ _4\"></span>e disease. T<span class=\"_ _4\"></span>he company\u2019<span class=\"_ _1\"></span>s THR-687<span class=\"_ _4\"></span> certain reductions. Also<span class=\"_ _1\"></span>, if Oxurion gr<span class=\"_ _4\"></span>ants a sublicense to<span class=\"_ _1a9\"> </span> asset for which development has been paused is a r<span class=\"_ _4\"></span>esult of<span class=\"_ _1a9\"> </span> a third party for rights to the program for non-ophthalmic<span class=\"_ _1a9\"> </span> this agreement. Oxurion has obtained the exclusive rights f<span class=\"_ _4\"></span>or<span class=\"_ _1a9\"> </span> use,<span class=\"_ _1\"></span> Bicycle w<span class=\"_ _4\"></span>ould be entitled to receive tier<span class=\"_ _4\"></span>ed payments<span class=\"_ _1a9\"> </span> the clinical development,<span class=\"_ _1\"></span> manufacturing and commercial<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>of mid-single digits to low-doub<span class=\"_ _4\"></span>le digits (no higher than first<span class=\"_ _1a9\"> </span> ization under this agreement,<span class=\"_ _1\"></span> while Galapagos is entitled to<span class=\"_ _3\"></span> quartile) based on a percentage of non-royalty sublicensing<span class=\"_ _1a9\"> </span> receive a non-refundab<span class=\"_ _4\"></span>le upfront fee for tec<span class=\"_ _4\"></span>hnolog<span class=\"_ _3\"></span>y access,<span class=\"_ _4\"></span> income. In line with IFRS princip<span class=\"_ _4\"></span>les,<span class=\"_ _1\"></span> no provisions have been<span class=\"_ _1a9\"> </span> development milestone payments of up to 12.5 million<span class=\"_ _1a9\"> </span> made in the Company\u2019<span class=\"_ _1\"></span>s books for these payments<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>euro (e<span class=\"_ _4\"></span>.g.,<span class=\"_ _4\"></span> 1<span class=\"_ _1\"></span>.5 million euro related to the first Phase 3 if the<span class=\"_ _1a9\"> </span> Company decides to do one<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> and 5 million euro when the<span class=\"_ _3\"></span> In November 2017<span class=\"_ _0\"></span>,<span class=\"_ _4\"></span> the parties entered into an amendment<span class=\"_ _3\"></span> first regulatory approval in either the United States or the<span class=\"_ _1a9\"> </span> to the Bicyc<span class=\"_ _4\"></span>le collaboration agreement. T<span class=\"_ _4\"></span>his amendment<span class=\"_ _1a9\"> </span> European Union is granted for the fir<span class=\"_ _4\"></span>st indication)<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> provides f<span class=\"_ _4\"></span>or additional researc<span class=\"_ _4\"></span>h ser<span class=\"_ _3\"></span>vices to be per<span class=\"_ _3\"></span>formed<span class=\"_ _1a9\"> </span> by Bicy<span class=\"_ _4\"></span>cle related to the identification of ad<span class=\"_ _4\"></span>ditional Bicyc<span class=\"_ _4\"></span>le<span class=\"_ _1a9\"> </span> In addition,<span class=\"_ _1\"></span> to the extent any of the collaboration products<span class=\"_ _1a9\"> </span> peptides binding to the target for Oxurion,<span class=\"_ _1\"></span> in its discretion,<span class=\"_ _4\"></span> to<span class=\"_ _1a9\"> </span> cover<span class=\"_ _4\"></span>ed by the licenses granted to Oxurion ar<span class=\"_ _4\"></span>e commercial<span class=\"_ _4\"></span><span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>select as development compounds. Bicy<span class=\"_ _4\"></span>cle w<span class=\"_ _4\"></span>as obligated to<span class=\"_ _1a9\"> </span> ized<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> Galapagos would be entitled to receive certain sales-<span class=\"_ _1a9\"> </span>perform the work in accordance with an amended researc<span class=\"_ _4\"></span>h<span class=\"_ _1a9\"> </span> based milestone payments and tiered ro<span class=\"_ _4\"></span>yalty payments of<span class=\"_ _1a9\"> </span> plan under Stage 1 of the collabor<span class=\"_ _4\"></span>ation and was funded at a<span class=\"_ _1a9\"> </span> mid-single digits based on a percentage of net sales,<span class=\"_ _1\"></span> except<span class=\"_ _1a9\"> </span> specified FTE rate<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> plus any direct out of pocket expenses<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> and<span class=\"_ _1a9\"> </span> in the case of annual sales exceeding 500 million euro<span class=\"_ _1\"></span>, in<span class=\"_ _1a9\"> </span> Oxurion was r<span class=\"_ _4\"></span>esponsible for Stage 2 resear<span class=\"_ _4\"></span>ch and an<span class=\"_ _4\"></span>y de<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>which case the ro<span class=\"_ _4\"></span>yalty is higher<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span> velopment after the selection of a development compound<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> Bicyc<span class=\"_ _4\"></span>le has completed Stage 1 of the researc<span class=\"_ _4\"></span>h plan. Ad<span class=\"_ _4\"></span>ditional<span class=\"_ _1a9\"> </span> In September 2017<span class=\"_ _25\"></span>,<span class=\"_ _1\"></span> the par<span class=\"_ _3\"></span>ties entered into an amendment<span class=\"_ _1a9\"> </span> milestones wer<span class=\"_ _4\"></span>e added for the potential additional licensed<span class=\"_ _1a9\"> </span> to the Galapagos License Agreement. Accor<span class=\"_ _4\"></span>ding to this<span class=\"_ _1a9\"> </span> compounds,<span class=\"_ _1\"></span> consistent with those of the initial Bicycle<span class=\"_ _1a9\"> </span> amendment,<span class=\"_ _4\"></span> Oxurion has taken o<span class=\"_ _4\"></span>ver the prosecution and<span class=\"_ _1a9\"> </span> Collaboration Agr<span class=\"_ _4\"></span>eement. This does not impact THR-149<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>maintenance of the licensed patents and consequently has<span class=\"_ _1a9\"> </span> acquired all rights in the licensed patents with effective date<span class=\"_ _1a9\"> </span> as of September 25<span class=\"_ _1\"></span>, 2017<span class=\"_ _25\"></span>. Oxurion will be entitled to deduct<span class=\"_ _1a9\"> </span> its documented and reasonable costs f<span class=\"_ _4\"></span>or prosecution and<span class=\"_ _1a9\"> </span>maintenance for the licensed patents from the ro<span class=\"_ _4\"></span>yalty due and payable to Galapagos under the Galapagos License Agreement. In line with IFRS principles<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> no pro<span class=\"_ _4\"></span>visions have been made in the Company\u2019<span class=\"_ _1\"></span>s books for these payments<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>Oxurion has paid to Galapagos an upfront fee of 1<span class=\"_ _1\"></span>.0 million<span class=\"_ _3\"></span> euro in April 2016<span class=\"_ _25\"></span>, upon Galapagos supp<span class=\"_ _4\"></span>lying to Oxurion the licensed compounds,<span class=\"_ _1\"></span> including THR-687<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> and all data and manufacturing kno<span class=\"_ _4\"></span>w-how related to the licensed compounds,<span class=\"_ _1\"></span> which was capitalized as an intangible asset as it meets the conditions of a separately acquir<span class=\"_ _4\"></span>ed intan<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>gible asset under IAS 38<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> par<span class=\"_ _1\"></span>. 25<span class=\"_ _1\"></span>. Galapagos has no fur<span class=\"_ _3\"></span>ther performance obligations for development ser<span class=\"_ _3\"></span>vices. Since no commercialization was ac<span class=\"_ _4\"></span>hieved and no profit was generated<span class=\"_ _1\"></span>, no amortization was r<span class=\"_ _4\"></span>ecorded so far<span class=\"_ _1\"></span>. Until now<span class=\"_ _25\"></span>, no other advance payments have been made to Galapagos<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>In the first half of 2022,<span class=\"_ _4\"></span> the Galapagos license w<span class=\"_ _4\"></span>as fully impaired (1 million euro) given the announcement that Oxurion has decided not to advance THR-687<span class=\"_ _1\"></span> to par<span class=\"_ _3\"></span>t B of<span class=\"_ _3\"></span> the INTEGRAL trial.<span class=\"_ _1a9\"> </span>The future milestones m<span class=\"_ _4\"></span>ust be assessed to determine if they meet the capitalization criteria under IAS 38<span class=\"_ _1\"></span>, once they are paid<span class=\"_ _1\"></span>. We r<span class=\"_ _4\"></span>efer to the accounting policy section on intan<span class=\"ls0 ws0\">-<span class=\"_ _1a9\"> </span></span>gible assets for mor<span class=\"_ _4\"></span>e details.<span class=\"_ _1a9\"> </span>Clinical T<span class=\"_ _25\"></span>rial Agreement<span class=\"_ _1a9\"> </span>Syneos Health<span class=\"_ _1a9\"> </span>Syneos Health (<span class=\"ff3 ws0\">\u201cSyneos<span class=\"_ _1\"></span>\u201d<span class=\"ff1 ws269\">) provides clinical r<span class=\"_ _4\"></span>esearch </span></span>ser<span class=\"_ _3\"></span>vices for the development of THR-149<span class=\"_ _1\"></span>. Ser<span class=\"_ _3\"></span>vices are billed on a project basis by w<span class=\"_ _4\"></span>ay of work or<span class=\"_ _4\"></span>ders (<span class=\"ff3 ws0\">\u201cW<span class=\"_ _4\"></span>ork </span>Orders<span class=\"_ _4\"></span>\u201d<span class=\"ff1 ws26a\">) enter<span class=\"_ _4\"></span>ed into based on a Master Ser<span class=\"_ _3\"></span>vices </span>Agreement (the <span class=\"ff3 ws0\">\u201cMSA<span class=\"_ _0\"></span>\u201d<span class=\"ff1 ws10b\">) for Clinical Research and Related </span></span>Ser<span class=\"_ _3\"></span>vices dated as of August 19<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> 2016<span class=\"_ _25\"></span>.   The MSA obligates the parties to use commercially rea<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>sonable efforts to progress the study in a timely manner and to meet any timelines for stud<span class=\"_ _4\"></span>y milestones and target dates applying prof<span class=\"_ _4\"></span>essional standards consistent with GCP and in adherence to applicab<span class=\"_ _4\"></span>le laws and regulations<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>The major study milestones and target dates ar<span class=\"_ _4\"></span>e described in the binding W<span class=\"_ _4\"></span>ork Orders that ar<span class=\"_ _4\"></span>e entered into under the MSA. Subject to mutually agreed c<span class=\"_ _4\"></span>hange orders,<span class=\"_ _1\"></span> the W<span class=\"_ _4\"></span>ork Order constitutes a binding agreement,<span class=\"_ _1\"></span> and the par<span class=\"_ _3\"></span>ties are obligated to use commer<span class=\"_ _4\"></span>cially reasonable eff<span class=\"_ _4\"></span>orts to comply with the timelines and b<span class=\"_ _4\"></span>udgets set in the W<span class=\"_ _4\"></span>ork Orders,<span class=\"_ _1\"></span> unless a change order is agreed<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>The W<span class=\"_ _4\"></span>ork Order f<span class=\"_ _4\"></span>or THR-149 specifies the basic parame<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ters of the THR -149 study<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> including,<span class=\"_ _1\"></span> without limitation, <span class=\"_ _4\"></span>the scope of work,<span class=\"_ _1\"></span> study-specific assumptions,<span class=\"_ _4\"></span> estimated time period for completing services,<span class=\"_ _4\"></span> estimated budget,<span class=\"_ _1\"></span> payment and currency sc<span class=\"_ _4\"></span>hedules,<span class=\"_ _1\"></span> resource allocation and/or<span class=\"_ _1\"></span>, as ap<span class=\"_ _4\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>plicable<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> other specific ser<span class=\"_ _23\"></span>vices to be performed by Syneos<span class=\"_ _4\"></span>. <span class=\"_ _190\"></span> The budget contained in the THR-149 W<span class=\"_ _1\"></span>ork Order can be changed b<span class=\"_ _4\"></span>y way of a change or<span class=\"_ _4\"></span>der if there are c<span class=\"_ _4\"></span>hanges in the scope of the work or the assumptions underl<span class=\"_ _4\"></span>ying the W<span class=\"_ _4\"></span>ork Order<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> pro<span class=\"_ _4\"></span>vided that the change or<span class=\"_ _4\"></span>der must be agreed betw<span class=\"_ _4\"></span>een the parties.<span class=\"_ _1a9\"> </span>Syneos also pro<span class=\"_ _4\"></span>vided ser<span class=\"_ _3\"></span>vices for the INTEGRAL study of THR-687<span class=\"_ _4\"></span> in treatment na\u00efve patients<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> whic<span class=\"_ _4\"></span>h has been terminated and is in the process of being wound do<span class=\"_ _4\"></span>wn pursuant to the terms of the W<span class=\"_ _4\"></span>ork Order f<span class=\"_ _4\"></span>or THR-687<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>Based on IAS 38 \u201cIntangible assets<span class=\"_ _1\"></span>\u201d, the costs paid to Syneos Health are not made in or<span class=\"_ _4\"></span>der to acquire an asset,<span class=\"_ _1\"></span> or to increase economic benefits alread<span class=\"_ _4\"></span>y embodied into an asset. Rather<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> they are an outsourced R&amp;D cost. T<span class=\"_ _4\"></span>herefor<span class=\"_ _4\"></span>e,<span class=\"_ _1\"></span> such costs are expensed to the statement of pr<span class=\"_ _4\"></span>ofit and loss as R&amp;D expenses,<span class=\"_ _1\"></span> as incurred<span class=\"_ _4\"></span>. In case of prepayments<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> an asset is recognized for suc<span class=\"_ _4\"></span>h prepayment,<span class=\"_ _1\"></span> and prepay<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ment is released to statement of profit and loss as costs are incurr<span class=\"_ _4\"></span>ed<span class=\"_ _4\"></span>. In 2022 and 2021<span class=\"_ _1\"></span>, 7<span class=\"_ _25\"></span>.4 million euro and 6<span class=\"_ _25\"></span>.5<span class=\"_ _1a9\"> </span>million euro wer<span class=\"_ _4\"></span>e paid respectively to S<span class=\"_ _4\"></span>yneos Health and<span class=\"_ _1a9\"> </span> F<span class=\"_ _1\"></span>or 2022,<span class=\"_ _4\"></span> Oxurion paid 0<span class=\"_ _1\"></span>.067<span class=\"_ _4\"></span> million euro (2021: 0<span class=\"_ _25\"></span>.072<span class=\"_ _1a9\"> </span> recognized as R&amp;D expenses<span class=\"_ _4\"></span>. At y<span class=\"_ _4\"></span>ear<span class=\"_ _1\"></span>-end 2022,<span class=\"_ _4\"></span> a prepay<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>million euro) for distribution costs<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 0<span class=\"_ _25\"></span>.204 million euro (2021:<span class=\"_ _1a9\"> </span> ment in the amount of .2.3 million euro is recorded on the<span class=\"_ _1a9\"> </span> 0<span class=\"_ _1\"></span>.225 million euro) for selling expenses and received<span class=\"_ _1a9\"> </span> statement of profit and loss<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>0<span class=\"_ _1\"></span>.403 million euro (2021: 0<span class=\"_ _1\"></span>.588 million euro) reven<span class=\"_ _4\"></span>ue for<span class=\"_ _1a9\"> </span> the select number of markets ser<span class=\"_ _3\"></span>ved by Eumedica.<span class=\"_ _1a9\"> </span>License,<span class=\"_ _1\"></span> Development and Commercial Agreement<span class=\"_ _1a9\"> </span>On March 12,<span class=\"_ _1\"></span> 2020<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion entered into an exclusive<span class=\"_ _1a9\"> </span> Eumedica and Inceptua<span class=\"_ _1a9\"> </span>license with Inceptua for the commercialization and<span class=\"_ _1a9\"> </span> marketing of JETREA\u00ae outside of the US in certain transfer<span class=\"_ _1a9\"> </span> In June 2018<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion and Eumedica entered into an<span class=\"_ _1a9\"> </span> countries. T<span class=\"_ _25\"></span>ransfer countries include all countries of the<span class=\"_ _1a9\"> </span> exclusive commercial agr<span class=\"_ _4\"></span>eement,<span class=\"_ _4\"></span> pursuant to whic<span class=\"_ _4\"></span>h<span class=\"_ _1a9\"> </span> European Union,<span class=\"_ _4\"></span> Norway<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> Liechtenstein,<span class=\"_ _1\"></span> Switzerland,<span class=\"_ _1\"></span> the<span class=\"_ _1a9\"> </span> Eumedica agreed to pro<span class=\"_ _4\"></span>vide distribution services for<span class=\"_ _1a9\"> </span> UK and Australia and sales may also be made in non-ap<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>JETREA\u00ae (the <span class=\"ff3 wsa4\">\u201c2018 Agreement\u201d</span>)<span class=\"_ _1\"></span>. Eumedica acts as an<span class=\"_ _1a9\"> </span> proved countries on a named patient basis under r<span class=\"_ _4\"></span>espect<span class=\"_ _1a9\"> </span> agent of Oxurion,<span class=\"_ _4\"></span> as Oxurion takes primary responsibility<span class=\"_ _1a9\"> </span> of applicable la<span class=\"_ _4\"></span>w<span class=\"_ _1\"></span>. The parties fur<span class=\"_ _3\"></span>ther agreed that Oxurion<span class=\"_ _1a9\"> </span> for product quality<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> inventory risk,<span class=\"_ _4\"></span> and has discretion in es<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>would withdr<span class=\"_ _4\"></span>aw the marketing authorizations in the US<span class=\"_ _1a9\"> </span> tablishing the sales price<span class=\"_ _4\"></span>. The arr<span class=\"_ _4\"></span>angement has the char<span class=\"_ _1\"></span><span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>and Canada and would tr<span class=\"_ _4\"></span>ansfer the EMEA marketing au<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>acteristics of a consignment where Eumedica does not<span class=\"_ _1a9\"> </span> thorization to Inceptua. The license became effective on<span class=\"_ _1a9\"> </span> have control of the pr<span class=\"_ _4\"></span>oduct,<span class=\"_ _4\"></span> and Oxurion can direct its use<span class=\"_ _1a9\"> </span> September 15<span class=\"_ _1\"></span>, 2020<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> when the EMEA market authoriza<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>and ask for its return. Eumedica collects payments fr<span class=\"_ _4\"></span>om<span class=\"_ _1a9\"> </span> tion was tr<span class=\"_ _4\"></span>ansferred<span class=\"_ _1\"></span>. Under the terms of the agreement,<span class=\"_ _4\"></span> end-customers for Oxurion. Eumedica char<span class=\"_ _4\"></span>ges a monthly<span class=\"_ _1a9\"> </span> Inceptua purchases JETREA\u00ae fr<span class=\"_ _4\"></span>om Oxurion in final product<span class=\"_ _1a9\"> </span> distribution fee that co<span class=\"_ _4\"></span>vers the ser<span class=\"_ _3\"></span>vices provided inc<span class=\"_ _4\"></span>luding<span class=\"_ _1a9\"> </span> form for a fixed amount per vial and pays Oxurion a market<span class=\"_ _1a9\"> </span> customer ser<span class=\"_ _3\"></span>vice,<span class=\"_ _1\"></span> shipment preparation,<span class=\"_ _4\"></span> packag<span class=\"_ _4\"></span>ing,<span class=\"_ _4\"></span> rate ro<span class=\"_ _4\"></span>yalty on sales based on quarterly royalty reports.<span class=\"_ _1a9\"> </span> storage<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> labeling/r<span class=\"_ _4\"></span>epackaging,<span class=\"_ _4\"></span> administr<span class=\"_ _4\"></span>ation,<span class=\"_ _4\"></span> destruction<span class=\"_ _1a9\"> </span> &amp; waste handling,<span class=\"_ _4\"></span> etc<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span> As a result of its agreement with Inceptua,<span class=\"_ _1\"></span> Oxurion entered<span class=\"_ _1a9\"> </span> into a tripartite agreement with Eumedica and Inceptua<span class=\"_ _1a9\"> </span> Under IFRS 15<span class=\"_ _1\"></span>, Oxurion has onl<span class=\"_ _4\"></span>y one performance obliga<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>pursuant to which Eumedica pr<span class=\"_ _4\"></span>ovides certain packaging,<span class=\"_ _4\"></span> tion,<span class=\"_ _4\"></span> which is to deliver the pr<span class=\"_ _4\"></span>oduct to the end-customer<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span> labelling and storage ser<span class=\"_ _3\"></span>vices directly to Oxurion and<span class=\"_ _1a9\"> </span> This performance obligation is satisfied when Eumedica<span class=\"_ _1a9\"> </span> purchases the finished pr<span class=\"_ _4\"></span>oduct from Oxurion and sells its<span class=\"_ _1a9\"> </span> transfers (deliver<span class=\"_ _4\"></span>s) the product to the end-customer<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> as this<span class=\"_ _1a9\"> </span> to Inceptua (the <span class=\"ff3 ws12e\">\u201cT<span class=\"_ _25\"></span>ripar<span class=\"_ _3\"></span>tite Agreement\u201d<span class=\"ff1 ws125\">)<span class=\"_ _4\"></span>. The T<span class=\"_ _25\"></span>ripar<span class=\"_ _3\"></span>tite<span class=\"_ _1a9\"> </span></span></span><span class=\"ff3 ws12e\"><span class=\"ff1 ws125\"> </span></span>is the moment when the customer obtains control o<span class=\"_ _4\"></span>ver the<span class=\"_ _1a9\"> </span> Agreement rep<span class=\"_ _4\"></span>laces the 2018 Agreement. Eumedica also<span class=\"_ _1a9\"> </span> product. Ther<span class=\"_ _4\"></span>efore<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> r<span class=\"_ _4\"></span>evenue is recognized for the price of<span class=\"_ _1a9\"> </span> provides certain ser<span class=\"_ _3\"></span>vices to Oxurion on behalf of Inceptua,<span class=\"_ _4\"></span> the product at the point in time when it is delivered b<span class=\"_ _4\"></span>y<span class=\"_ _1a9\"> </span> including storage<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> customer ser<span class=\"_ _23\"></span>vices and deliver<span class=\"_ _3\"></span>y<span class=\"_ _1\"></span>,<span class=\"_ _1\"></span> which<span class=\"_ _1a9\"> </span> Eumedica to the end-customer<span class=\"_ _1\"></span>. While inventor<span class=\"_ _3\"></span>y is located<span class=\"_ _1a9\"> </span> are re-c<span class=\"_ _4\"></span>harged to Inceptua.<span class=\"_ _1a9\"> </span> at Eumedica,<span class=\"_ _4\"></span> it is recognized as in<span class=\"_ _4\"></span>ventor<span class=\"_ _3\"></span>y of Oxurion due to<span class=\"_ _1a9\"> </span> consignment terms. Eumedica f<span class=\"_ _4\"></span>ees are recognized partly<span class=\"_ _1a9\"> </span> After a transition period which w<span class=\"_ _4\"></span>as completed in December<span class=\"_ _1a9\"> </span> under distribution costs and partly under selling expenses,<span class=\"_ _4\"></span> 2020<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s obligations under the T<span class=\"_ _25\"></span>ripar<span class=\"_ _3\"></span>tite Agreement<span class=\"_ _1a9\"> </span> as they are char<span class=\"_ _4\"></span>ged on a monthly basis.<span class=\"_ _1a9\"> </span>will be limited to supply of the JETREA\u00ae pr<span class=\"_ _4\"></span>oduct to<span class=\"_ _1a9\"> </span> Inceptua until 2023<span class=\"_ _1\"></span>. All other activities related to JETREA\u00ae<span class=\"_ _1a9\"> </span> will be transferr<span class=\"_ _4\"></span>ed to Inceptua or will cease<span class=\"_ _1a9\"> </span>Under IFRS 15<span class=\"_ _1\"></span>, Oxurion<span class=\"_ _1\"></span>\u2019<span class=\"_ _4\"></span>s only performance obligation is to deliver final products to Inceptua. This ob<span class=\"_ _4\"></span>ligation is completed when Eumedica sells the products to Inceptua. Oxurion therefor<span class=\"_ _4\"></span>e recognizes the reven<span class=\"_ _4\"></span>ue from the sale of the goods when the assets are sold b<span class=\"_ _4\"></span>y Eumedica to Inceptua. Royalties ar<span class=\"_ _4\"></span>e recognised quarterly upon reception of royalty r<span class=\"_ _4\"></span>eport from Inceptua.<span class=\"_ _1a9\"> </span>Oxurion received 0<span class=\"_ _25\"></span>.153 million euro royalties (2021: 0<span class=\"_ _1\"></span>.159 million euro) for the select number of markets served by Inceptua.<span class=\"_ _1a9\"> </span>Academic Agreements<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y has concluded agreements with various academic institutions that are interested in the stud<span class=\"_ _4\"></span>y of drug candidates,<span class=\"_ _1\"></span> including the following:<span class=\"_ _1a9\"> </span>Flanders Institute for Biotechno<span class=\"_ _4\"></span>log<span class=\"_ _3\"></span>y<span class=\"_ _1a9\"> </span>The Compan<span class=\"_ _4\"></span>y has entered into several agr<span class=\"_ _4\"></span>eements with the V<span class=\"_ _4\"></span>esalius Researc<span class=\"_ _4\"></span>h Centre (former<span class=\"_ _4\"></span>ly the Dept. of T<span class=\"_ _25\"></span>ransgene T<span class=\"_ _1\"></span>echnology and Gene Therapy)<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> a department of VIB<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> relating to the preclinical char<span class=\"_ _4\"></span>acterization of two of the programs under license with the V<span class=\"_ _1\"></span>esalius Research Centre<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> i.e<span class=\"_ _4\"></span>.,<span class=\"_ _1\"></span> Anti-PlGF and PlGF<span class=\"_ _25\"></span>.<span class=\"_ _1a9\"> </span>On December 12,<span class=\"_ _4\"></span> 2017<span class=\"_ _0\"></span>, Oncurious and VIB enter<span class=\"_ _4\"></span>ed into a researc<span class=\"_ _4\"></span>h collaboration and license agreement on the basis of which Oncurious acquired exc<span class=\"_ _4\"></span>lusive licenses on a portfolio of five unique next generation immuno-oncology assets,<span class=\"_ _1\"></span> based on seminal work originating from the VIB-KU Leuven labs of Massimiliano Mazzone and Gabriele Bergers,<span class=\"_ _1\"></span> and from the VIB-<span class=\"_ _1\"></span>VUB lab of Jo V<span class=\"_ _1\"></span>an Ginderachter<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>In the context of the abovementioned r<span class=\"_ _4\"></span>esearch collabor<span class=\"_ _4\"></span>a<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tion and license agreement,<span class=\"_ _1\"></span> VIB has been granted two call options from Oxurion for an aggregate maximum of 1<span class=\"_ _4\"></span>,230 shares in Oncurious,<span class=\"_ _1\"></span> subject to the achievement of certain milestones linked to the achievement of one or tw<span class=\"_ _4\"></span>o proof of concepts (call option agreement of December 12,<span class=\"_ _1\"></span> 2017). On October 22,<span class=\"_ _4\"></span> 2021<span class=\"_ _1\"></span>, Oncurious announced the ac<span class=\"_ _4\"></span>hieve<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>ment of a second preclinical pr<span class=\"_ _4\"></span>oof of concept for its im<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>muno-oncology program aimed at depleting regulatory T cells (T<span class=\"_ _25\"></span>regs) by targeting C-C motif chemokine r<span class=\"_ _4\"></span>eceptor 8 (CCR8)<span class=\"_ _4\"></span>. Consequently<span class=\"_ _25\"></span>,<span class=\"_ _4\"></span> at y<span class=\"_ _4\"></span>ear end 2021<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> VIB is entitled to execute its remaining call option of 550 shares<span class=\"_ _4\"></span>. P<span class=\"_ _4\"></span>ost-<span class=\"_ _1a9\"> </span>closing VIB indicated it is executing this remaining call option in full.<span class=\"_ _1a9\"> </span>As per June 30<span class=\"_ _25\"></span>, 2021<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the VIB IP license has been impaired<span class=\"_ _1\"></span>, compared with a net carrying amount of 1.127<span class=\"_ _1\"></span> million euro in 2020<span class=\"_ _1\"></span>. During 2021<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> Oxurion has paid 0<span class=\"_ _1\"></span>.211 million euro of R&amp;D costs respectively to VIB in r<span class=\"_ _4\"></span>elation to this research program. On September 28<span class=\"_ _1\"></span>, 2022,<span class=\"_ _1\"></span> Oncurious entered into an agreement with VIB concerning the assignment of intellec<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tual property rights and know-how<span class=\"_ _25\"></span>, and the termination of certain licenses. The assignment concerns Oncurious<span class=\"_ _1\"></span>\u2019 C-C motif chemokine r<span class=\"_ _4\"></span>eceptor 8 (CCR8) program,<span class=\"_ _1\"></span> as well as other undisclosed assets<span class=\"_ _4\"></span>. The assignment does not include Oncurious<span class=\"_ _4\"></span>\u2019 TB-403 asset. The agr<span class=\"_ _4\"></span>eement was conc<span class=\"_ _4\"></span>luded follo<span class=\"_ _4\"></span>wing the decision of Oncurious not to further invest in the foreground tec<span class=\"_ _4\"></span>hnology of several discover<span class=\"_ _3\"></span>y stage and preclinical pr<span class=\"_ _4\"></span>ograms<span class=\"_ _4\"></span>. In consideration of Oxurion<span class=\"_ _4\"></span>\u2019<span class=\"_ _1\"></span>s contri<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>butions to<span class=\"_ _4\"></span>wards the development of for<span class=\"_ _4\"></span>eground techno<span class=\"_ _4\"></span>l<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>og<span class=\"_ _3\"></span>y by Oncurious,<span class=\"_ _1\"></span> prior to Oncurious<span class=\"_ _4\"></span>\u2019 abandonment and assignment to VIB thereof<span class=\"_ _1\"></span>,<span class=\"_ _4\"></span> the parties agreed on a revenue sharing agreement with Oxurion upon VIB\u2019<span class=\"_ _1\"></span>s valorization of such for<span class=\"_ _4\"></span>eground technology<span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>On December 14<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> 2022,<span class=\"_ _1\"></span> Oxurion purchased 2,018 shares in Oncurious from VIB for 1 euro<span class=\"_ _1a9\"> </span><span class=\"_ _1\"></span>.<span class=\"_ _1a9\"> </span>Other Commitments<span class=\"_ _1a9\"> </span>Research and development commitments<span class=\"_ _1a9\"> </span>At December 3<span class=\"_ _4\"></span>1<span class=\"_ _4\"></span>,<span class=\"_ _1\"></span> 2022,<span class=\"_ _4\"></span> the Group had commitments<span class=\"_ _1a9\"> </span>outstanding in the context of researc<span class=\"_ _4\"></span>h and development<span class=\"_ _1a9\"> </span>agreements amounting to 11<span class=\"_ _1\"></span>.0 million euro compared to<span class=\"_ _1a9\"> </span>18<span class=\"_ _1\"></span>.0 million euro in 2021<span class=\"_ _4\"></span>,<span class=\"_ _4\"></span> payable o<span class=\"_ _4\"></span>ver the course of the<span class=\"_ _1a9\"> </span>follo<span class=\"_ _4\"></span>wing twelve months to various resear<span class=\"_ _4\"></span>ch subcontrac<span class=\"ws0\">-<span class=\"_ _1a9\"> </span></span>tors,<span class=\"_ _1\"></span> but primarily to Syneos<span class=\"_ _4\"></span>.<span class=\"_ _1a9\"> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCommitmentsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-28": {
   "value": "Contingent liability The expenses incurred in several of the Group\u2019s research and development programs have been reimbursed by VLAIO, formerly known as IWT, as a government grant. Contracts with VLAIO generally include a clause that defines the need for validation of the project results in order for the grant to be effectively earned. Should this alidation not occur, VLAIO has the right to reclaim the unds previously granted. The Group considers this as a emote possibility. Please refer to the accounting policy described in section 5.5.3 (G) and the rationale used in order to recognize grant income over the course of the project. Total amounts received in 2021 with respect to government grants from VLAIO amount to 0.228 million euro. No amounts were received in 2022. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherProvisionsContingentLiabilitiesAndContingentAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-29": {
   "value": "TANGIBLE ASSETS at the lower of cost or net realizable value. The inventory costing system is based on the FIFO-method. Property, plant, and equipment are included at the histori- cal cost (material costs only) less accumulated deprecia- Goods in process and finished goods are stated at the tion. Subsequent costs are included in the carrying amount standard manufacturing cost or net realizable value. The for the asset or booked as a separate asset as appropriate, inventory costing system is based on the FIFO-method. but only when it is probable that future economic benefits associated with the item will be generated for the Group Net realizable value test is performed each reporting and the cost price of the item can be measured reliably. period. Net realizable value is the estimated selling price All other repair and maintenance costs are charged to the in the ordinary course of business less the estimated costs income statement as incurred.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForRepairsAndMaintenanceExplanatory",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00"
   }
  },
  "fact-30": {
   "value": "CASH AND CASH EQUIVALENTS Cash and cash equivalents comprise demand deposits and other short-term, highly liquid investments (with less than three months to maturity) that are readily convertible into a known amount of cash and are subject to an insig- nificant risk of fluctuations in value",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyToDetermineComponentsOfCashAndCashEquivalents",
    "language": "en",
    "entity": "scheme:549300VWY8KVDFKLDM59",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00"
   }
  }
 }
}