{
 "documentInfo": {
  "documentType": "https://xbrl.org/2021/xbrl-json",
  "features": {
   "xbrl:canonicalValues": true
  },
  "namespaces": {
   "ELI": "http://elia.be/2022-12-31",
   "ifrs-full": "http://xbrl.ifrs.org/taxonomy/2021-03-24/ifrs-full",
   "iso4217": "http://www.xbrl.org/2003/iso4217",
   "scheme": "http://standards.iso.org/iso/17442",
   "xbrl": "https://xbrl.org/2021",
   "xbrli": "http://www.xbrl.org/2003/instance"
  },
  "taxonomy": [
   "http://elia.be/2022-12-31/549300S1MP1NFDIKT460-2022-12-31.xsd"
  ]
 },
 "facts": {
  "f69412": {
   "value": "3616000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Revenue",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69416": {
   "value": "2551300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Revenue",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69426": {
   "value": "69700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:RawMaterialsAndConsumablesUsed",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69430": {
   "value": "83100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:RawMaterialsAndConsumablesUsed",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69440": {
   "value": "259600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69444": {
   "value": "135100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69454": {
   "value": "237700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:IncomeExpenseFromSettlementMechanism",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69458": {
   "value": "173300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:IncomeExpenseFromSettlementMechanism",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69468": {
   "value": "2554700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ServicesExpense",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69472": {
   "value": "1443600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ServicesExpense",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69482": {
   "value": "372100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:EmployeeBenefitsExpense",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69486": {
   "value": "334100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:EmployeeBenefitsExpense",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69496": {
   "value": "513700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DepreciationAmortisationAndImpairmentLossReversalOfImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69500": {
   "value": "467500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DepreciationAmortisationAndImpairmentLossReversalOfImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69510": {
   "value": "-1300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:ChangesInProvisionsRecognisedInProfitLossFromOperatingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69514": {
   "value": "-700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:ChangesInProvisionsRecognisedInProfitLossFromOperatingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69523": {
   "value": "44400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherExpenseByNature",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69527": {
   "value": "41400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherExpenseByNature",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69537": {
   "value": "559800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:ProfitLossFromOperatingActivitiesBeforeShareOfProfitLossOfAssociatesAndJointVentures",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69541": {
   "value": "490700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:ProfitLossFromOperatingActivitiesBeforeShareOfProfitLossOfAssociatesAndJointVentures",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69551": {
   "value": "39500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ShareOfProfitLossOfAssociatesAndJointVenturesAccountedForUsingEquityMethod",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69555": {
   "value": "49400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ShareOfProfitLossOfAssociatesAndJointVenturesAccountedForUsingEquityMethod",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69565": {
   "value": "599400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromOperatingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69569": {
   "value": "540100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromOperatingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69577": {
   "value": "-43600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:FinanceIncomeCost",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69581": {
   "value": "-106600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:FinanceIncomeCost",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69590": {
   "value": "75400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:FinanceIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69594": {
   "value": "3900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:FinanceIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69604": {
   "value": "119000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:FinanceCosts",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69608": {
   "value": "110500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:FinanceCosts",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69618": {
   "value": "555700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossBeforeTax",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69622": {
   "value": "433500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossBeforeTax",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69632": {
   "value": "147500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxExpenseContinuingOperations",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69636": {
   "value": "105200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxExpenseContinuingOperations",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69645": {
   "value": "408200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69649": {
   "value": "328300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69669": {
   "value": "341700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToOrdinaryEquityHoldersOfParentEntity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69673": {
   "value": "276000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToOrdinaryEquityHoldersOfParentEntity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69683": {
   "value": "19300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:ProfitLossAttributableToHybridCapitalOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69687": {
   "value": "19300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:ProfitLossAttributableToHybridCapitalOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69696": {
   "value": "47200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToNoncontrollingInterests",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69700": {
   "value": "33100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToNoncontrollingInterests",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69709": {
   "value": "408200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69713": {
   "value": "328300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69742": {
   "value": "4.8",
   "decimals": 2,
   "dimensions": {
    "concept": "ifrs-full:BasicEarningsLossPerShare",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR/xbrli:shares"
   }
  },
  "f69746": {
   "value": "4.02",
   "decimals": 2,
   "dimensions": {
    "concept": "ifrs-full:BasicEarningsLossPerShare",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR/xbrli:shares"
   }
  },
  "f69756": {
   "value": "4.8",
   "decimals": 2,
   "dimensions": {
    "concept": "ifrs-full:DilutedEarningsLossPerShare",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR/xbrli:shares"
   }
  },
  "f69760": {
   "value": "4.02",
   "decimals": 2,
   "dimensions": {
    "concept": "ifrs-full:DilutedEarningsLossPerShare",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR/xbrli:shares"
   }
  },
  "f69831": {
   "value": "408200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69835": {
   "value": "328300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69866": {
   "value": "-160100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeBeforeTaxCashFlowHedges",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69870": {
   "value": "356200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeBeforeTaxCashFlowHedges",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69879": {
   "value": "-50400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxRelatingToComponentsOfOtherComprehensiveIncomeThatWillBeReclassifiedToProfitOrLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69883": {
   "value": "105800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxRelatingToComponentsOfOtherComprehensiveIncomeThatWillBeReclassifiedToProfitOrLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69901": {
   "value": "16300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeBeforeTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69905": {
   "value": "27400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeBeforeTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69915": {
   "value": "32800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeBeforeTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69919": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeBeforeTaxGainsLossesFromInvestmentsInEquityInstruments",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69928": {
   "value": "4900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxRelatingToComponentsOfOtherComprehensiveIncomeThatWillNotBeReclassifiedToProfitOrLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69932": {
   "value": "7000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxRelatingToComponentsOfOtherComprehensiveIncomeThatWillNotBeReclassifiedToProfitOrLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69942": {
   "value": "-65600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69946": {
   "value": "270800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69956": {
   "value": "342600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69960": {
   "value": "599100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69980": {
   "value": "299000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:ComprehensiveIncomeAttributableToOrdinaryEquityHoldersOfParentEntity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69984": {
   "value": "496300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:ComprehensiveIncomeAttributableToOrdinaryEquityHoldersOfParentEntity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69994": {
   "value": "19300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:ComprehensiveIncomeAttributableToHybridCapitalOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f69998": {
   "value": "19300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:ComprehensiveIncomeAttributableToHybridCapitalOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70007": {
   "value": "24400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToNoncontrollingInterests",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70011": {
   "value": "83500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToNoncontrollingInterests",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70021": {
   "value": "342600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70025": {
   "value": "599100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70077": {
   "value": "14941900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70082": {
   "value": "13867500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70093": {
   "value": "11844700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PropertyPlantAndEquipment",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70098": {
   "value": "10859500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PropertyPlantAndEquipment",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70107": {
   "value": "2411100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Goodwill",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70111": {
   "value": "2411100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Goodwill",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70121": {
   "value": "210500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IntangibleAssetsOtherThanGoodwill",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70125": {
   "value": "148600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IntangibleAssetsOtherThanGoodwill",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70135": {
   "value": "261200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:InvestmentAccountedForUsingEquityMethod",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70139": {
   "value": "309600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:InvestmentAccountedForUsingEquityMethod",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70149": {
   "value": "117200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentFinancialAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70153": {
   "value": "136300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentFinancialAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70163": {
   "value": "95500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentReceivables",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70167": {
   "value": "500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentReceivables",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70177": {
   "value": "1700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70181": {
   "value": "1900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70189": {
   "value": "5652400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70193": {
   "value": "4276800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70201": {
   "value": "21600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Inventories",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70205": {
   "value": "21600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Inventories",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70215": {
   "value": "1206200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherCurrentReceivables",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70219": {
   "value": "861300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherCurrentReceivables",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70229": {
   "value": "28600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxAssetsCurrent",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70233": {
   "value": "10100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxAssetsCurrent",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70243": {
   "value": "219700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentFinancialAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70247": {
   "value": "316200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentFinancialAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70256": {
   "value": "4151200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70260": {
   "value": "3049500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70270": {
   "value": "25100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentPrepaymentsAndCurrentAccruedIncomeIncludingCurrentContractAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70274": {
   "value": "18100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentPrepaymentsAndCurrentAccruedIncomeIncludingCurrentContractAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70282": {
   "value": "20594300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Assets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70287": {
   "value": "18144300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Assets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70304": {
   "value": "5756400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70308": {
   "value": "4938400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70318": {
   "value": "5319600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:EquityAttributableToOwnersOfParent",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70322": {
   "value": "4552000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:EquityAttributableToOwnersOfParent",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70332": {
   "value": "4618300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70336": {
   "value": "3850600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70345": {
   "value": "1823100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IssuedCapital",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70349": {
   "value": "1709200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IssuedCapital",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70357": {
   "value": "738600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:SharePremium",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70361": {
   "value": "262900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:SharePremium",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70369": {
   "value": "173000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherReserves",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70373": {
   "value": "173000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherReserves",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70382": {
   "value": "119200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ReserveOfCashFlowHedges",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70386": {
   "value": "197100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ReserveOfCashFlowHedges",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70394": {
   "value": "1800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:TreasuryShares",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70398": {
   "value": "800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:TreasuryShares",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70408": {
   "value": "1766200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:RetainedEarnings",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70412": {
   "value": "1509200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:RetainedEarnings",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70422": {
   "value": "701400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:EquityAttributableToHybridCapitalOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70426": {
   "value": "701400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:EquityAttributableToHybridCapitalOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70435": {
   "value": "436700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:NoncontrollingInterests",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70439": {
   "value": "386400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:NoncontrollingInterests",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70447": {
   "value": "8548000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70451": {
   "value": "8471300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70461": {
   "value": "7715600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:LongTermBorrowingsAndNonCurrentLeaseLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70465": {
   "value": "7741700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:LongTermBorrowingsAndNonCurrentLeaseLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70475": {
   "value": "75000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentProvisionsForEmployeeBenefits",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70479": {
   "value": "104900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentProvisionsForEmployeeBenefits",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70487": {
   "value": "146200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentProvisions",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70491": {
   "value": "125600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentProvisions",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70500": {
   "value": "223700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70504": {
   "value": "209700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70513": {
   "value": "387600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70517": {
   "value": "289500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70525": {
   "value": "6289800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70529": {
   "value": "4734600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70539": {
   "value": "867200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:ShortTermBorrowingsAndCurrentLeaseLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70543": {
   "value": "194000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:ShortTermBorrowingsAndCurrentLeaseLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70551": {
   "value": "8600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentProvisions",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70555": {
   "value": "7700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentProvisions",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70565": {
   "value": "4804200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherCurrentPayables",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70569": {
   "value": "3696400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherCurrentPayables",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70579": {
   "value": "26600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxLiabilitiesCurrent",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70583": {
   "value": "26800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxLiabilitiesCurrent",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70593": {
   "value": "583300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentAccrualsAndCurrentDeferredIncomeIncludingCurrentContractLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70597": {
   "value": "809800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CurrentAccrualsAndCurrentDeferredIncomeIncludingCurrentContractLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70607": {
   "value": "20594300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:EquityAndLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70612": {
   "value": "18144300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:EquityAndLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70688": {
   "value": "1709100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70692": {
   "value": "262400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70696": {
   "value": "-3300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70700": {
   "value": "173000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70706": {
   "value": "1330500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70710": {
   "value": "3471700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70714": {
   "value": "701400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:HybridCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70718": {
   "value": "4173100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70722": {
   "value": "326900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70726": {
   "value": "4500000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70744": {
   "value": "295200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70748": {
   "value": "295200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70754": {
   "value": "295200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70758": {
   "value": "33100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70762": {
   "value": "328300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70773": {
   "value": "200400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70781": {
   "value": "20000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70785": {
   "value": "220300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70791": {
   "value": "220300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70795": {
   "value": "50400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70799": {
   "value": "270800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70811": {
   "value": "200400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70819": {
   "value": "315200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70823": {
   "value": "515600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70829": {
   "value": "515600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70833": {
   "value": "83500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70837": {
   "value": "599100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70898": {
   "value": "200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70902": {
   "value": "400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70914": {
   "value": "600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70920": {
   "value": "600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70926": {
   "value": "600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70942": {
   "value": "19300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:CouponPaymentsOnHybridCapital",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70946": {
   "value": "19300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:CouponPaymentsOnHybridCapital",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70952": {
   "value": "19300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:CouponPaymentsOnHybridCapital",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70958": {
   "value": "19300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:CouponPaymentsOnHybridCapital",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f70974": {
   "value": "800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70980": {
   "value": "800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70986": {
   "value": "800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f70992": {
   "value": "800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71018": {
   "value": "24000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsRecognisedAsDistributionsToNoncontrollingInterests",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71022": {
   "value": "24000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsRecognisedAsDistributionsToNoncontrollingInterests",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71038": {
   "value": "117500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71042": {
   "value": "117500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71048": {
   "value": "117500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71054": {
   "value": "117500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71070": {
   "value": "300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71074": {
   "value": "300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71080": {
   "value": "300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71086": {
   "value": "300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71096": {
   "value": "200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71100": {
   "value": "400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71108": {
   "value": "-800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71112": {
   "value": "-136500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71116": {
   "value": "-136700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71122": {
   "value": "-136700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71126": {
   "value": "-24000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71130": {
   "value": "-160700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71137": {
   "value": "1709300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71141": {
   "value": "262800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71145": {
   "value": "197100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71149": {
   "value": "173000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71153": {
   "value": "-800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71157": {
   "value": "1509200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71161": {
   "value": "3850600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71165": {
   "value": "701400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:HybridCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71169": {
   "value": "4552000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71173": {
   "value": "386400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71177": {
   "value": "4938400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71233": {
   "value": "1709300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71237": {
   "value": "262800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71241": {
   "value": "197100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71245": {
   "value": "173000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71249": {
   "value": "-800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71253": {
   "value": "1509200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71257": {
   "value": "3850600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71261": {
   "value": "701400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:HybridCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71265": {
   "value": "4552000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71269": {
   "value": "386400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71273": {
   "value": "4938400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71291": {
   "value": "361000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71295": {
   "value": "361000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71301": {
   "value": "361000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71305": {
   "value": "47200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71309": {
   "value": "408200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71320": {
   "value": "-77900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71328": {
   "value": "35100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71332": {
   "value": "-42700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71338": {
   "value": "-42700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71342": {
   "value": "-22800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71346": {
   "value": "-65600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71358": {
   "value": "-77900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71366": {
   "value": "396100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71370": {
   "value": "318300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71376": {
   "value": "318300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71380": {
   "value": "24400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71384": {
   "value": "342600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71445": {
   "value": "119400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71449": {
   "value": "475700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71461": {
   "value": "595100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71467": {
   "value": "595100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71473": {
   "value": "595100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71481": {
   "value": "7300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ShareIssueRelatedCost",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71495": {
   "value": "7300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ShareIssueRelatedCost",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71501": {
   "value": "7300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ShareIssueRelatedCost",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71507": {
   "value": "7300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ShareIssueRelatedCost",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71513": {
   "value": "1700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71527": {
   "value": "1700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71533": {
   "value": "1700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71539": {
   "value": "1700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71555": {
   "value": "19300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:CouponPaymentsOnHybridCapital",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71559": {
   "value": "19300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:CouponPaymentsOnHybridCapital",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71565": {
   "value": "19300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:CouponPaymentsOnHybridCapital",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71571": {
   "value": "19300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:CouponPaymentsOnHybridCapital",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71587": {
   "value": "1000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71593": {
   "value": "1000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71599": {
   "value": "1000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71605": {
   "value": "1000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfTreasuryShares",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71631": {
   "value": "24000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsRecognisedAsDistributionsToNoncontrollingInterests",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71635": {
   "value": "24000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsRecognisedAsDistributionsToNoncontrollingInterests",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71651": {
   "value": "120300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71655": {
   "value": "120300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71661": {
   "value": "120300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71667": {
   "value": "120300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71675": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71685": {
   "value": "300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71689": {
   "value": "400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71695": {
   "value": "400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71699": {
   "value": "50000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71703": {
   "value": "50400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransfersAndOtherChangesEquity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71713": {
   "value": "113800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71717": {
   "value": "475700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71721": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71725": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71729": {
   "value": "-1000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71733": {
   "value": "-139200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71737": {
   "value": "449400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71741": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:HybridCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71745": {
   "value": "449400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71749": {
   "value": "26000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71753": {
   "value": "475400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughTransactionsWithOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71762": {
   "value": "1823100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71766": {
   "value": "738600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:SharePremiumMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71770": {
   "value": "119200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71774": {
   "value": "173000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:OtherReservesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71778": {
   "value": "-1800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:TreasurySharesMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71782": {
   "value": "1766200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71786": {
   "value": "4618300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:EquityAttributableToOrdinaryEquityHoldersOfParentEntityMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71790": {
   "value": "701400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ELI:HybridCapitalMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71794": {
   "value": "5319700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71798": {
   "value": "436700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:EUR"
   }
  },
  "f71802": {
   "value": "5756400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71857": {
   "value": "408200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71861": {
   "value": "328300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71879": {
   "value": "-43600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFinanceIncomeCost",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71883": {
   "value": "-106600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFinanceIncomeCost",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71892": {
   "value": "3900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherAdjustmentsForNoncashItems",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71896": {
   "value": "2100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherAdjustmentsForNoncashItems",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71906": {
   "value": "112100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncomeTaxExpense",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71910": {
   "value": "94700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncomeTaxExpense",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71920": {
   "value": "39500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForUndistributedProfitsOfInvestmentsAccountedForUsingEquityMethod",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71924": {
   "value": "49400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForUndistributedProfitsOfInvestmentsAccountedForUsingEquityMethod",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71934": {
   "value": "513700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDepreciationAndAmortisationExpenseAndImpairmentLossReversalOfImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71938": {
   "value": "467500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDepreciationAndAmortisationExpenseAndImpairmentLossReversalOfImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71950": {
   "value": "-6300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForLossesGainsOnDisposalOfNoncurrentAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71954": {
   "value": "17500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForLossesGainsOnDisposalOfNoncurrentAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71964": {
   "value": "800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForImpairmentLossReversalOfImpairmentLossRecognisedInProfitOrLossTradeAndOtherReceivables",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71968": {
   "value": "800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForImpairmentLossReversalOfImpairmentLossRecognisedInProfitOrLossTradeAndOtherReceivables",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71978": {
   "value": "-10500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForProvisions",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71982": {
   "value": "1500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForProvisions",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71991": {
   "value": "35400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDeferredTaxExpense",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f71995": {
   "value": "10500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDeferredTaxExpense",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72005": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFairValueGainsLosses",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72009": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFairValueGainsLosses",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72021": {
   "value": "1061400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperationsBeforeChangesInWorkingCapital",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72025": {
   "value": "980100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperationsBeforeChangesInWorkingCapital",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72035": {
   "value": "-300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInInventories",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72039": {
   "value": "17000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInInventories",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72049": {
   "value": "-314700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInTradeAndOtherReceivables",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72053": {
   "value": "639900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInTradeAndOtherReceivables",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72063": {
   "value": "-3700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInOtherCurrentAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72067": {
   "value": "-700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInOtherCurrentAssets",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72077": {
   "value": "1188100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncreaseDecreaseInTradeAndOtherPayables",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72081": {
   "value": "2645000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncreaseDecreaseInTradeAndOtherPayables",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72091": {
   "value": "-243100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncreaseDecreaseInOtherCurrentLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72095": {
   "value": "-119800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncreaseDecreaseInOtherCurrentLiabilities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72105": {
   "value": "-626300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInWorkingCapital",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72109": {
   "value": "-3181400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInWorkingCapital",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72118": {
   "value": "133100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:InterestPaidClassifiedAsOperatingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72122": {
   "value": "124900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:InterestPaidClassifiedAsOperatingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72132": {
   "value": "5700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:InterestReceivedClassifiedAsOperatingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72136": {
   "value": "3700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:InterestReceivedClassifiedAsOperatingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72145": {
   "value": "129200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxesPaidClassifiedAsOperatingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72149": {
   "value": "87000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxesPaidClassifiedAsOperatingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72158": {
   "value": "1431200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72162": {
   "value": "3953300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72184": {
   "value": "115700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfIntangibleAssetsClassifiedAsInvestingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72188": {
   "value": "59800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfIntangibleAssetsClassifiedAsInvestingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72198": {
   "value": "1455400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfPropertyPlantAndEquipmentClassifiedAsInvestingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72202": {
   "value": "1160500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfPropertyPlantAndEquipmentClassifiedAsInvestingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72212": {
   "value": "27500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromSalesOfPropertyPlantAndEquipmentClassifiedAsInvestingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72216": {
   "value": "3500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromSalesOfPropertyPlantAndEquipmentClassifiedAsInvestingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72226": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromSalesOfInvestmentsOtherThanInvestmentsAccountedForUsingEquityMethod",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72230": {
   "value": "1600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromSalesOfInvestmentsOtherThanInvestmentsAccountedForUsingEquityMethod",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72240": {
   "value": "53800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromSalesOfInvestmentsAccountedForUsingEquityMethod",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72244": {
   "value": "30500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromSalesOfInvestmentsAccountedForUsingEquityMethod",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72254": {
   "value": "35400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsReceivedClassifiedAsInvestingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72258": {
   "value": "31800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsReceivedClassifiedAsInvestingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72268": {
   "value": "0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherInflowsOutflowsOfCashClassifiedAsInvestingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72272": {
   "value": "-500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:OtherInflowsOutflowsOfCashClassifiedAsInvestingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72284": {
   "value": "-1454400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72288": {
   "value": "-1153400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72310": {
   "value": "595100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromIssuingShares",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72314": {
   "value": "600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromIssuingShares",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72324": {
   "value": "50000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromContributionsOfNoncontrollingInterests",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72336": {
   "value": "7300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PaymentsForShareIssueCosts",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72340": {
   "value": "-0",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PaymentsForShareIssueCosts",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72350": {
   "value": "900000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PaymentsToAcquireOrRedeemEntitysShares",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72354": {
   "value": "700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:PaymentsToAcquireOrRedeemEntitysShares",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72363": {
   "value": "120300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaidClassifiedAsFinancingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72367": {
   "value": "117500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaidClassifiedAsFinancingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72375": {
   "value": "19300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:CouponPaymentsOnHybridCapitalClassifiedAsFinancingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72379": {
   "value": "19300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ELI:CouponPaymentsOnHybridCapitalClassifiedAsFinancingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72389": {
   "value": "24000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaidToNoncontrollingInterestsClassifiedAsFinancingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72393": {
   "value": "24000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaidToNoncontrollingInterestsClassifiedAsFinancingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72401": {
   "value": "95800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:RepaymentsOfBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72405": {
   "value": "737700000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:RepaymentsOfBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72415": {
   "value": "747400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72419": {
   "value": "558000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72429": {
   "value": "1125000000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72433": {
   "value": "-340600000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivities",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72443": {
   "value": "1101800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInCashAndCashEquivalents",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72447": {
   "value": "2459300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInCashAndCashEquivalents",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72465": {
   "value": "3049500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72469": {
   "value": "590100000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72479": {
   "value": "4151200000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72483": {
   "value": "3049500000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72493": {
   "value": "1101800000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInCashAndCashEquivalents",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "f72497": {
   "value": "2459300000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInCashAndCashEquivalents",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "s8_notes__5__15": {
   "value": "NOTES ACCOMPANYING THE CONSOLIDATED FINANCIAL STATEMENTS 1.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Reporting entity </span>The registered o<span class=\"_ _2\"></span>ffice of Elia Group <span class=\"ls27\">SA</span>/NV (hereafter referred to as the <span class=\"ff42\">\u201c</span>Company<span class=\"ff42\">\u201d or \u201cElia\u201d</span>) is established in Belgium and located at 20 Boulevard de l\u2019Empereur<span class=\"ff3f\">, 1000 Brussels. Elia Group SA/NV is a public limited company, whose shares are listed on Euronext Brussels, </span>under<span class=\"_ _2\"></span> the symbol ELI.<span class=\"_ _e\"></span> The consolidated financial statements for the financial year 2022 include tho<span class=\"_ _2\"></span>se of Elia Group SA/NV<span class=\"_ _e\"></span> and its subsidiaries (collectively referred to as <span class=\"ff42\">\u2018</span>the Group' or 'Elia group') and the group's interests in joint ventures and associates<span class=\"fs11\">.</span> The Elia group compr<span class=\"_ _2\"></span>ises two electricity transmission syst<span class=\"_ _e\"></span>em operators (TSOs): Elia Transmission Belgium SA/NV in Belgium and 50Hertz Tran<span class=\"_ _2\"></span>smission GmbH<span class=\"ls1d\">, </span>in which the Elia group hol<span class=\"_ _e\"></span>ds an 80% stake. 50Hertz Transmission GmbH is <span class=\"ff42\">one of Germany\u2019s four </span>transmission system<span class=\"_ _2\"></span> operators; it operates in the north and east of the country.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> also has a 50% stake in Nemo Link Ltd, which <span class=\"_ _e\"></span>constructed an electrical interconnector between the UK and Belgium:<span class=\"_ _e\"></span> the Nemo Link <span class=\"_ _2\"></span>interconnector. Nemo Link <span class=\"_ _e\"></span>Ltd is a joint venture between Elia Transmission Belgium SA/NV and National Grid Ventures (in the UK)<span class=\"ls1d\">. It </span>began its commercial operations on <span class=\"ls5b\">30 </span>J<span class=\"_ _e\"></span>anuary 2019, with a transfer capacity of 1000 MW. With around 2,750 employe<span class=\"_ _2\"></span>es and a transmission system<span class=\"_ _e\"></span> that comprises some 19,126 km of high-voltage connections and serves 30<span class=\"ls0\"> million end consumers, the Elia g<span class=\"ff42\">roup is one of Europe\u2019s top five TSOs. It efficiently, reliably and securely </span>trans<span class=\"_ _e\"></span>ports electricity from </span>generators <span class=\"_ _2\"></span>to distribution system operators and major ind<span class=\"_ _e\"></span>ustrial con<span class=\"_ _2\"></span>sumers, while also importing and exporting electricity fr<span class=\"_ _e\"></span>om and to neighbouring<span class=\"_ _2\"></span> countries. The g<span class=\"_ _e\"></span>roup is a driving force beh<span class=\"_ _2\"></span>in<span class=\"_ _e\"></span>d the development of the European electricity market and the integration of energ<span class=\"_ _2\"></span>y generated from renewable sources. In addition to its <span class=\"_ _e\"></span>transmission activities in Belgium and Germany, the Elia group offers businesses a range o<span class=\"_ _2\"></span>f consultancy and engineering servi<span class=\"_ _e\"></span>ces. Through Elia a<span class=\"_ _2\"></span>nd 50Hertz, Elia Grou<span class=\"ff42\">p\u2019s mission is to <span class=\"_ _e\"></span>realise the climate ambitions of the European Green Deal. </span>Over the next few years, large-<span class=\"_ _2\"></span>scale investments in renewable energy prod<span class=\"_ _e\"></span>uction and the<span class=\"_ _2\"></span> offshore grid are due to be undertaken. To make a fundamental contribu<span class=\"_ _2\"></span>tion to the accelerated development of offshore e<span class=\"_ _e\"></span>nergy, in 2022 Elia Group created a new subsidiary: Wind<span class=\"_ _e\"></span>Grid. We refer to note 6.1 where further<span class=\"_ _2\"></span> information is provided on the inve<span class=\"_ _e\"></span>stment p<span class=\"_ _2\"></span>lan<span class=\"_ _e\"></span><span class=\"ls1d\">. </span> The group<span class=\"_ _2\"></span> operates under the legal entity Elia Group SA<span class=\"_ _e\"></span>/NV<span class=\"ls1d\">, </span>which is a listed company whose reference shareholder is municipal holding compan<span class=\"_ _2\"></span>y Publi-T <span class=\"ls27\">SC</span>. Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.2.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Basis of prepara<span class=\"_ _2\"></span>tion</span>2.1. <span class=\"_ _87\"> </span>Statement of compliance These <span class=\"_ _2\"></span>consolidated financial statements were <span class=\"_ _e\"></span>prepared in accordance with the International Financial Reporting Standards (IFRS), which have been adopted by the European Union. In doing so, the group applied all new and revised standards and interpretations publ<span class=\"ls0\">ished by the International Accounting Standards Board (IASB), including those which came into effect f<span class=\"_ _e\"></span>or the financial year starting </span>on 1 Januar<span class=\"_ _2\"></span>y 2022, which are applicable to the g<span class=\"ff42\">rou<span class=\"_ _e\"></span>p\u2019s activities</span>. New and <span class=\"_ _e\"></span>amended sta<span class=\"_ _2\"></span>ndards and interpretations The standards, amendments<span class=\"_ _2\"></span> and interpretations listed bel<span class=\"_ _e\"></span>ow came into effect in 2022<span class=\"ls1d\">, </span>with little or limited impact on the group:<span class=\"ff45\"> </span>\u2022<span class=\"ff3f\"> <span class=\"_ _62\"> </span><span class=\"fc3\">Ame<span class=\"_ _2\"></span>ndment to IFRS 16 Leases: COVID-<span class=\"ls5b\">19</span>-Related Rent C<span class=\"_ _e\"></span>oncessions beyond<span class=\"_ _2\"></span> 30 June 2021 (applicable for annual periods </span></span>beginnin<span class=\"_ _2\"></span>g on or after 1 April 2021);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _62\"> </span><span class=\"fc3\">Ame<span class=\"_ _2\"></span>ndments to IAS 37 Provisions, Contingent Lia<span class=\"_ _2\"></span>bilities and Contingent Assets; Onerous Contracts <span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span> Cost of Fulfilling a </span></span>Contract (app<span class=\"_ _2\"></span>licable for annual periods beginning on or after 1 January 2022);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _62\"> </span><span class=\"fc3\">Ame<span class=\"_ _2\"></span>ndments to IAS 16 Property, Plant and Equipment: Proceeds before Intended Use (applicable for annual per<span class=\"_ _2\"></span>io<span class=\"_ _e\"></span>ds </span></span>beginnin<span class=\"_ _2\"></span>g on or after 1 January 2022);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _62\"> </span><span class=\"fc3\">Ame<span class=\"_ _2\"></span>ndments to IFRS 3 Business <span class=\"_ _2\"></span>Combinations: Reference to the Conceptual Framework (applicable for annual periods </span></span>beginnin<span class=\"_ _2\"></span>g on or after 1 Janua<span class=\"_ _e\"></span>ry 2022); \u2022<span class=\"ff3f\"> <span class=\"_ _62\"> </span><span class=\"fc3\">Ann<span class=\"_ _2\"></span>ual Improvements to IFRS Standard<span class=\"_ _2\"></span>s 2018<span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span>2020 (applicable for annual periods beginn<span class=\"_ _2\"></span>ing on or after 1 January 2022).<span class=\"_ _20\"></span> </span></span>The <span class=\"ff40\">standards<span class=\"_ _2\"></span>, amendments and interpretations <span class=\"ff3f\">listed<span class=\"_ _e\"></span> below did not ta<span class=\"_ _2\"></span>ke effec<span class=\"_ _e\"></span>t in 2022. The changes <span class=\"ls1d\">to</span> the standards, amendments </span></span>and interpretation<span class=\"_ _2\"></span>s listed below are not expecte<span class=\"_ _e\"></span>d to have a material impact on these annual accounts and are therefore not outlined in any great de<span class=\"_ _2\"></span>tail:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">IFRS 17<span class=\"_ _2\"></span>: Insurance Contracts (applicable for annual periods beginning on or <span class=\"_ _e\"></span>after 1 January 2023);<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Amendm<span class=\"_ _2\"></span>ents to IFRS 17 Insurance contracts: Initial Application of IFRS 17 and IFRS 9 <span class=\"ff42\">\u2013</span> Comparative Information <span class=\"_ _e\"></span>(applicable for </span></span>annual period<span class=\"_ _2\"></span>s beginning on or after 1 January 2023);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Amendm<span class=\"_ _2\"></span>ents to IAS 1 Presentation of Financial Statemen<span class=\"_ _e\"></span>ts: Classification of liabilities as Curre<span class=\"_ _2\"></span>nt or Non-cu<span class=\"_ _e\"></span>rrent (applicable for </span></span>annual period<span class=\"_ _2\"></span>s beginning on or after 1 January 2024, but not yet endorsed in the EU);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Amendm<span class=\"_ _2\"></span>ents to IAS 1 Presentation of Financial Statements and IFRS Practice Statement 2: Disclosur<span class=\"_ _e\"></span>e of Accounting Policies </span></span>(applicab<span class=\"_ _2\"></span>le for annual periods beginning on or after 1 J<span class=\"_ _e\"></span>anuary 2023); \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Amendm<span class=\"_ _2\"></span>ents to IAS 8 Accounting Policies, Changes in Accounting Estimates and Err<span class=\"_ _2\"></span>ors (applicable for annual periods beginning </span></span>on or after<span class=\"_ _2\"></span> 1 January 2023);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3 ls27\">Am<span class=\"ls0\">e<span class=\"_ _2\"></span>ndments to IAS 12 Income Ta<span class=\"_ _2\"></span>xes: Deferred Tax related to Assets and Liabilities arising from a Single Transaction (applicable<span class=\"_ _e\"></span> </span></span></span>for annual period<span class=\"_ _2\"></span>s beginning on or after 1 January 2023);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Amendm<span class=\"_ _2\"></span>ents to IFRS 16 Leases: Lease Liability in a Sale and Leaseback (ap<span class=\"_ _e\"></span>plicable for annual periods beginning on or after 1 </span></span>Januar<span class=\"_ _2\"></span>y 2024, but not yet endorsed in the EU). 2.2. <span class=\"_ _87\"> </span>Functional and presentation currency These <span class=\"_ _2\"></span>consolidated financial statements are presented in million<span class=\"_ _e\"></span>s of euro, rounded to the nearest hundred thousand, unless stated otherwise. 2.3. <span class=\"_ _87\"> </span>Basis of measurement In general, t<span class=\"_ _2\"></span><span class=\"ls78\">he<span class=\"ls0\">se consolidated financial sta<span class=\"_ _2\"></span>tements were prepared on a historical cost basis. However, <span class=\"_ _e\"></span>reporting related to the following </span></span>categor<span class=\"_ _2\"></span>ies deviate from this general rule:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Equity acco<span class=\"_ _2\"></span>unted investees: the equity method was applied to determine the value of a shareholding over w<span class=\"_ _e\"></span>hich the group has a </span></span>significant influence; \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Other<span class=\"_ _2\"></span> shareholdings: entities in which the group has a shareholding but over which it does not have a significant in<span class=\"_ _e\"></span>fluence were </span></span>valued at fair va<span class=\"_ _2\"></span>lue through other comprehensive income (OCI);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Curr<span class=\"_ _2\"></span>ent and non-current receivables were valued at the lo<span class=\"_ _e\"></span>west of the carr<span class=\"_ _2\"></span>ying am<span class=\"_ _e\"></span>ount and the recoverable amount;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Employee<span class=\"_ _2\"></span> benefits were valued at the present value of the defined benefit obligations<span class=\"ls1d\">, </span>minus the fair value of the pl<span class=\"_ _e\"></span>an assets (see </span></span>also Note 6<span class=\"_ _2\"></span>.14); \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Derivative<span class=\"_ _2\"></span> financial instruments <span class=\"ls1c\">we<span class=\"ls8f\">re</span></span> meas<span class=\"_ _e\"></span>ured at fair value through OCI or profit and loss (<span class=\"ls27\">P&amp;L</span>), depend<span class=\"_ _2\"></span>ing on wh<span class=\"_ _e\"></span>ether the </span></span>derivative can be designated<span class=\"_ _2\"></span> as <span class=\"ls5b\">a </span>h<span class=\"_ _e\"></span>edging instrument (see also Note 8.1); \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Decomm<span class=\"_ _2\"></span>issioning provisions were valued at present value. </span></span>2.4. <span class=\"_ _87\"> </span>Going concern The d<span class=\"_ _2\"></span>irectors reassessed the going concern assumption <span class=\"_ _e\"></span>of the Company and, at the time of approving the financial statements, held <span class=\"ls5b\">a </span>reasonable expectation tha<span class=\"_ _2\"></span>t the group had ade<span class=\"_ _e\"></span>quate resources to<span class=\"_ _2\"></span> continue in operational existence for the foreseeab<span class=\"_ _e\"></span>le future. The director<span class=\"_ _2\"></span>s will therefore continue to adopt the going concern basis of accounting in t<span class=\"_ _e\"></span>he preparation of the financial statements.<span class=\"_ _e\"></span> In the current con<span class=\"_ _2\"></span>text of inflation (energy crisis) and volatil<span class=\"_ _e\"></span>e market cond<span class=\"_ _2\"></span>itions, th<span class=\"_ _e\"></span>e group paid particular attention to <span class=\"_ _e\"></span>adequately reflecting<span class=\"_ _2\"></span> the current and expected impact of the situation on the financial <span class=\"_ _e\"></span>position, performance and cash flows of the company, applying t<span class=\"_ _2\"></span>he IFRS accounting principles in a consistent manner. In general, <span class=\"_ _e\"></span>since Elia Group is acting in accordance with the regulatory frameworks in Belgium and Germany, the profitab<span class=\"_ _2\"></span>ility and the fina<span class=\"_ _e\"></span>ncial position of the group have not been affected.  2.5. <span class=\"_ _87\"> </span>Use of estimates and judgements The preparation of these con<span class=\"_ _2\"></span>solidated financial statements in accordance with IFRS requires management to make judgements, estimates and a<span class=\"_ _2\"></span>ssumptions that could affect the reported amounts of assets and liabilities and revenue and expenses. The estimat<span class=\"_ _e\"></span>es and underlying assumptions are based on historical experience and various other fa<span class=\"_ _2\"></span>ctors that are believed to be rea<span class=\"_ _20\"></span>son<span class=\"_ _2\"></span>able under the circumstan<span class=\"_ _2\"></span>ces: the results of these estimates and assum<span class=\"_ _e\"></span>ptions form the basis for making judgements regarding the carr<span class=\"_ _2\"></span>ying amounts of assets and liabilities. Actual results could therefore differ from these e<span class=\"_ _2\"></span>stimates. The estimates and underlying assumptions are reviewed on an ongoing basis.<span class=\"_ _2\"></span> Revisions to accounting estimates are recognised either: in the period d<span class=\"_ _e\"></span>uring which the estimate is revised if th<span class=\"ls78\">e </span>revision on<span class=\"_ _2\"></span>ly affects this period; or in the period d<span class=\"_ _e\"></span>uring which the estimate is revised and throughout future periods if the revision affects both curren<span class=\"_ _2\"></span>t and future periods.<span class=\"_ _e\"></span> The fo<span class=\"_ _2\"></span>llowing points include information about significant <span class=\"_ _e\"></span>areas of estimation uncertainty and critical judgements in applying accounting policies that have the m<span class=\"_ _2\"></span>ost significant effect on the amounts recognised in the consolidated financial statements:<span class=\"_ _20\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> total allowed remuneration for the g<span class=\"ff42\">roup\u2019s </span>role as TSO <span class=\"ls1c\">in</span> the Belgian and German segments <span class=\"ls1c\">is</span> mainly determined by </span></span>calculation methods set b<span class=\"_ _2\"></span>y the Belgian federal regulator (<span class=\"_ _e\"></span>the Commission for Electricity and Gas Regulation or CRE<span class=\"_ _e\"></span>G) and the German federal regula<span class=\"_ _2\"></span>tor (the Federal Network Agency or<span class=\"_ _e\"></span> BNetzA) respectively<span class=\"ls95\">. <span class=\"_ _2\"></span><span class=\"ls0\">The recognition of deferral regulatory accounts is </span></span>also based on the differen<span class=\"_ _2\"></span>t regulatory schemes. F<span class=\"_ _e\"></span>or certain calculations, a level of professional judgement needs to be applied<span class=\"ls1d\">. </span>More d<span class=\"_ _2\"></span>isclosures are provided in Notes 6.2<span class=\"_ _e\"></span>0, 9.1.4 and 9.2.3. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Entities in which t<span class=\"_ _2\"></span>he group holds less than 20% of the voting rights but has significant influence a<span class=\"_ _e\"></span>re accounted for under the equity </span></span>method. Fo<span class=\"_ _2\"></span>llowing the guidance in IAS 28, the group ass<span class=\"_ _e\"></span>esses whether it has significant influence over its asso<span class=\"_ _2\"></span>ciat<span class=\"_ _e\"></span>es and therefore needs to account for them under the equity method (<span class=\"_ _2\"></span>rather than applying IFRS 9) and reassesses this i<span class=\"_ _e\"></span>n each reporting period (see a<span class=\"_ _2\"></span>lso Note <span class=\"ls5b\">6.<span class=\"_ _e\"></span>5)</span>.  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Defer<span class=\"_ _2\"></span>red tax assets are recognised for the carry-forward of unused tax losses and unused tax credits i<span class=\"_ _e\"></span>n so far as it is probable </span></span>that future taxable<span class=\"_ _2\"></span> profit will be available against which the unused tax losses and unused tax credits can be utilise<span class=\"_ _e\"></span>d. In making a judgement on this, management takes into account e<span class=\"_ _2\"></span>lem<span class=\"_ _e\"></span>ents such as long-term business strategy and tax planning opportunities (see Note 6.7).  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Credit <span class=\"_ _2\"></span>risk related to customers: management closely reviews the outstanding trade receivables, including by considering ageing, </span></span>paymen<span class=\"_ _2\"></span>t history and credit risk coverage (see Note 8.1<span class=\"_ _e\"></span>). \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Employee <span class=\"_ _2\"></span>benefits including reimbursement rights <span class=\"ff42\">\u2013</span> see <span class=\"_ _e\"></span>Note 6.<span class=\"ls5b\">14</span>: </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">The group <span class=\"_ _2\"></span>has d<span class=\"_ _2\"></span>efined benefit <span class=\"_ _2\"></span>plans and <span class=\"_ _2\"></span>defined contribution p<span class=\"_ _2\"></span>lans which a<span class=\"_ _2\"></span>re disclosed <span class=\"_ _2\"></span>in <span class=\"_ _2\"></span>Note 6.15. The ca<span class=\"_ _2\"></span>lculatio<span class=\"_ _e\"></span>n o<span class=\"_ _2\"></span>f <span class=\"_ _2\"></span>the<span class=\"_ _e\"></span> </span></span>liabilities <span class=\"_ _2\"></span>or asse<span class=\"_ _2\"></span>ts related <span class=\"_ _2\"></span>to the<span class=\"_ _2\"></span>se plans is <span class=\"_ _4b\"></span>bas<span class=\"_ _e\"></span>ed <span class=\"_ _2\"></span>on actuarial a<span class=\"_ _2\"></span>nd statistical <span class=\"_ _2\"></span>assumptions. For example, th<span class=\"_ _2\"></span>is is th<span class=\"_ _2\"></span>e case <span class=\"_ _4b\"></span>for<span class=\"_ _e\"></span> the present val<span class=\"_ _e\"></span>ue of f<span class=\"_ _e\"></span>uture <span class=\"_ _e\"></span>pension liabilities. <span class=\"_ _e\"></span>The p<span class=\"_ _e\"></span>resent <span class=\"_ _e\"></span>value is, <span class=\"_ _e\"></span>among o<span class=\"_ _e\"></span>ther facto<span class=\"_ _e\"></span>rs, impacted by <span class=\"_ _e\"></span>c<span class=\"_ _e\"></span>hanges in<span class=\"_ _20\"></span> discount rates, <span class=\"_ _4b\"></span>and <span class=\"_ _2\"></span>financial <span class=\"_ _2\"></span>assumptions <span class=\"_ _4b\"></span>such a<span class=\"_ _2\"></span>s fu<span class=\"_ _2\"></span>ture <span class=\"_ _4b\"></span>inc<span class=\"_ _e\"></span>reases <span class=\"_ _2\"></span>in <span class=\"_ _4b\"></span>salary. <span class=\"_ _2\"></span>In <span class=\"_ _2\"></span>addition<span class=\"_ _2\"></span>, <span class=\"_ _2\"></span>demographic <span class=\"_ _2\"></span>assumptions, <span class=\"_ _4b\"></span>such <span class=\"_ _2\"></span>as <span class=\"_ _2\"></span>average<span class=\"_ _e\"></span> assumed<span class=\"_ _2\"></span> retirement age, also affect the present value of f<span class=\"_ _e\"></span>uture pension liabilities. o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">In <span class=\"_ _20\"></span>determining <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>appropriate <span class=\"_ _5d\"></span>discount <span class=\"_ _20\"></span>rate, <span class=\"_ _20\"></span>management <span class=\"_ _20\"></span>considers <span class=\"_ _20\"></span>th<span class=\"_ _e\"></span>e <span class=\"_ _20\"></span>interest <span class=\"_ _20\"></span>rates <span class=\"_ _20\"></span>of <span class=\"_ _5d\"></span>corporate<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>b<span class=\"_ _e\"></span>onds <span class=\"_ _20\"></span>in <span class=\"_ _20\"></span>currencies<span class=\"_ _e\"></span> </span></span>consistent with <span class=\"_ _e\"></span>cur<span class=\"_ _e\"></span>rencies of <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>post-employment <span class=\"_ _e\"></span>benefi<span class=\"_ _e\"></span>t <span class=\"_ _e\"></span>obligation, i.e. <span class=\"_ _e\"></span>e<span class=\"_ _e\"></span>uro, <span class=\"_ _e\"></span>with <span class=\"_ _e\"></span>at <span class=\"_ _e\"></span>least <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>n <span class=\"_ _e\"></span>AA<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>rating <span class=\"_ _e\"></span>or <span class=\"_ _e\"></span>above, <span class=\"_ _20\"></span>as set by <span class=\"_ _e\"></span>at <span class=\"_ _e\"></span>least <span class=\"_ _20\"></span><span class=\"ls5b\">one <span class=\"_ _e\"></span></span>le<span class=\"_ _e\"></span>ading <span class=\"_ _e\"></span>rating <span class=\"_ _20\"></span>agen<span class=\"_ _2\"></span>cy <span class=\"_ _20\"></span>and<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>extra<span class=\"_ _2\"></span>polated <span class=\"_ _20\"></span>along <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>yield <span class=\"_ _20\"></span>curve <span class=\"_ _e\"></span>to <span class=\"_ _e\"></span>correspond <span class=\"_ _e\"></span>wit<span class=\"_ _e\"></span>h <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>expected ter<span class=\"_ _e\"></span>m <span class=\"_ _20\"></span>of the defined bene<span class=\"_ _2\"></span>fit obligation. Higher and lower yielding bonds are excluded in developing the appropriate yield curve<span class=\"_ _e\"></span>.  o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Each <span class=\"_ _e\"></span>plan's<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>proj<span class=\"_ _e\"></span>ected <span class=\"_ _e\"></span>cash<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>flow<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>is m<span class=\"_ _e\"></span>atched <span class=\"_ _e\"></span>to<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>th<span class=\"_ _e\"></span>e <span class=\"_ _e\"></span>spot <span class=\"_ _20\"></span>rates <span class=\"_ _e\"></span>o<span class=\"_ _e\"></span>f <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>he <span class=\"_ _20\"></span>yield <span class=\"_ _e\"></span>cu<span class=\"_ _e\"></span>rve <span class=\"_ _e\"></span>to<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>calculate <span class=\"_ _20\"></span>an <span class=\"_ _e\"></span>associated <span class=\"_ _20\"></span>present <span class=\"_ _e\"></span>value.<span class=\"_ _e\"></span> </span></span>A single <span class=\"_ _20\"></span>equivalent <span class=\"_ _20\"></span>discount <span class=\"_ _20\"></span>rate <span class=\"_ _20\"></span>is <span class=\"_ _20\"></span>then <span class=\"_ _20\"></span>determined <span class=\"_ _20\"></span>that <span class=\"_ _5d\"></span>produ<span class=\"_ _2\"></span>ces <span class=\"_ _20\"></span>that <span class=\"_ _20\"></span>same <span class=\"_ _20\"></span>present <span class=\"_ _20\"></span>valu<span class=\"_ _e\"></span>e. <span class=\"_ _5d\"></span>The <span class=\"_ _20\"></span>resulting <span class=\"_ _20\"></span>discount<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>rate therefore reflects both the curren<span class=\"_ _2\"></span>t interest rate environme<span class=\"_ _e\"></span>nt and the plan's distinct liability characteristics. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Provisions fo<span class=\"_ _2\"></span>r environmental remediation costs: at each y<span class=\"_ _e\"></span>ear-end, an estimate is made regarding future expenses with respect <span class=\"ls1d\">to</span> </span></span>soil remediation, based<span class=\"_ _2\"></span> on the exp<span class=\"_ _e\"></span>ert advice. The extent of remediation costs is dependent on a lim<span class=\"_ _2\"></span>ited number of uncertainties, including <span class=\"ls5b\">new</span>ly identified cases of soil contamination (see<span class=\"_ _e\"></span> Note 6.1<span class=\"ls5b\">5)</span>. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Other<span class=\"_ _2\"></span> provisions are based on the value of the claims filed or on the estimated amount of the risk exposure. The expected timing </span></span>of the relate<span class=\"_ _2\"></span>d cash outflow depends on the progress and <span class=\"_ _e\"></span>duration of the asso<span class=\"_ _2\"></span>ciated process/procedures (<span class=\"_ _e\"></span>see Note <span class=\"_ _e\"></span>6.1<span class=\"ls5b\">5)</span>. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In de<span class=\"_ _2\"></span>termining the appropriate discount rate to discount the future dismantling obligation, management c<span class=\"_ _e\"></span>onsiders the interest </span></span>rates o<span class=\"_ _2\"></span>f corporate bonds in euro with at least an AA rating<span class=\"_ _e\"></span> or above as <span class=\"_ _2\"></span>set by at least one <span class=\"_ _e\"></span>leading rating agency and extrapolated along the yield curve t<span class=\"_ _2\"></span>o correspond with the expected term of the dismantling obligation. A sensitiv<span class=\"_ _e\"></span>ity analysis is performed to measure the<span class=\"_ _2\"></span> impact of a differing discou<span class=\"_ _e\"></span>nt rate.  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Good<span class=\"_ _2\"></span>will impairment testing: the group performs impairment tests on goodwill and on cash-ge<span class=\"_ _e\"></span>nerating units (CGUs) at the </span></span>repor<span class=\"_ _2\"></span>ting date, and whenever there are indications tha<span class=\"_ _e\"></span>t the carrying amount might be higher than the recoverable amount.<span class=\"_ _2\"></span> This analysis is based on<span class=\"_ _2\"></span> assumptions such as esti<span class=\"_ _e\"></span>mated investment plans, remuneration defined in the regulatory frameworks, market evolutio<span class=\"_ _2\"></span>n, market share, margin evolution and discount rates (s<span class=\"_ _e\"></span>ee Note <span class=\"ls5b\">6.</span>3).<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Fair<span class=\"_ _2\"></span> value measurement of financial instruments: when th<span class=\"_ _e\"></span>e fair va<span class=\"_ _2\"></span>lues of financial assets and financial liabilities recorded in the </span></span>statement of <span class=\"_ _2\"></span>financial position cannot be measured based on quoted prices in active markets, their fair valu<span class=\"_ _e\"></span>e is measured using valuation techniq<span class=\"_ _2\"></span>ues. The inputs fo<span class=\"_ _e\"></span>r these valuation techniques are taken from observable markets where possible. Where this is not fea<span class=\"_ _2\"></span>sible, a certain level of professional judgement is r<span class=\"_ _e\"></span>equired in establishing fair va<span class=\"_ _2\"></span>lues. Changes in t<span class=\"_ _e\"></span>he fair value of the derivative hedg<span class=\"_ _2\"></span>ing instrument designated as a cash flow hedge are recognised directly in OCI t<span class=\"_ _e\"></span>o the extent that the hedge is effective. If the hedge is ineffe<span class=\"_ _2\"></span>ctive, changes in fair value are recognised in profit or loss (see Note <span class=\"_ _e\"></span>6<span class=\"ls1d\">.1<span class=\"ls78\">8)</span></span>. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> useful life of the fixed assets is defined to reflect the r<span class=\"_ _e\"></span>eal depreciation of each asse<span class=\"_ _2\"></span>t. The depreciation of property, plant and </span></span>equipment is m<span class=\"_ _2\"></span>ainly calculated based on the useful lives <span class=\"_ _e\"></span>determined by the regulatory frameworks in Belgium and Germany, which are considered to be the be<span class=\"_ _2\"></span>st possible approximation of actual events in terms of economic utilisati<span class=\"_ _e\"></span>on. (see Note 3.3.1 and 6.1) \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> group makes use of practical expedients when applying IFRS 16 (Leasing): </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">The g<span class=\"_ _e\"></span>roup applies <span class=\"_ _e\"></span>a <span class=\"_ _e\"></span>single <span class=\"_ _e\"></span>discount r<span class=\"_ _e\"></span>ate p<span class=\"_ _e\"></span>er typ<span class=\"_ _e\"></span>e of <span class=\"_ _e\"></span>contracts, <span class=\"_ _e\"></span>summarised pe<span class=\"_ _e\"></span>r thei<span class=\"_ _e\"></span>r duration. <span class=\"_ _e\"></span>Those l<span class=\"_ _e\"></span>eases <span class=\"_ _e\"></span>are <span class=\"_ _e\"></span>as<span class=\"_ _e\"></span>sumed </span></span>to <span class=\"_ _e\"></span>have <span class=\"_ _20\"></span>similar <span class=\"_ _20\"></span>characteristics. <span class=\"_ _20\"></span>The <span class=\"_ _e\"></span>disc<span class=\"_ _e\"></span>ount <span class=\"_ _20\"></span>rate <span class=\"_ _20\"></span>used <span class=\"_ _e\"></span>is<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>g<span class=\"_ _e\"></span>roup's <span class=\"_ _20\"></span>best <span class=\"_ _e\"></span>estim<span class=\"_ _e\"></span>at<span class=\"_ _e\"></span>e <span class=\"_ _20\"></span>of <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>w<span class=\"_ _e\"></span>eighted <span class=\"_ _20\"></span>average <span class=\"_ _20\"></span>incremental borro<span class=\"_ _2\"></span>wing rate. Each lease contract is classified in a duration bucket (&lt;5 years, between 5 and 10 years, etc.) for which an interest <span class=\"_ _e\"></span>rate <span class=\"_ _e\"></span>is <span class=\"_ _20\"></span>derived e<span class=\"_ _e\"></span>qual <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>o <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>interest r<span class=\"_ _e\"></span>ate <span class=\"_ _e\"></span>of <span class=\"_ _20\"></span>a t<span class=\"_ _e\"></span>raded <span class=\"_ _e\"></span>bond <span class=\"_ _20\"></span>with t<span class=\"_ _e\"></span>he <span class=\"_ _e\"></span>sa<span class=\"_ _e\"></span>me <span class=\"_ _e\"></span>rating <span class=\"_ _20\"></span>as E<span class=\"_ _e\"></span>lia <span class=\"_ _e\"></span>Group <span class=\"_ _e\"></span>SA<span class=\"_ _e\"></span>/NV <span class=\"_ _e\"></span>in <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>same<span class=\"_ _e\"></span> sector with <span class=\"ls5b\">a </span>similar duration. The interest rate is fixed over the lifetime of the lease contract. o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">The g<span class=\"_ _e\"></span>roup assesses <span class=\"_ _e\"></span>the n<span class=\"_ _e\"></span>on-cancellable <span class=\"_ _e\"></span>period of <span class=\"_ _e\"></span>each <span class=\"_ _e\"></span>of <span class=\"_ _e\"></span>the contracts <span class=\"_ _20\"></span>falling within the <span class=\"_ _e\"></span>sc<span class=\"_ _e\"></span>ope of <span class=\"_ _e\"></span>IFRS 1<span class=\"_ _e\"></span>6. T<span class=\"_ _e\"></span>his includes<span class=\"_ _e\"></span> </span></span>the period <span class=\"_ _20\"></span>cover<span class=\"_ _2\"></span>ed <span class=\"_ _e\"></span>by <span class=\"_ _20\"></span>an option <span class=\"_ _20\"></span>to extend <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>leas<span class=\"_ _e\"></span>e, <span class=\"_ _e\"></span>if <span class=\"_ _e\"></span>th<span class=\"_ _e\"></span>e <span class=\"_ _e\"></span>lessee <span class=\"_ _e\"></span>is <span class=\"_ _20\"></span>rea<span class=\"_ _2\"></span>sonabl<span class=\"_ _e\"></span>y <span class=\"_ _e\"></span>certain <span class=\"_ _20\"></span>tha<span class=\"_ _2\"></span>t <span class=\"_ _e\"></span>they <span class=\"_ _20\"></span>will <span class=\"_ _e\"></span>exercise <span class=\"_ _e\"></span>that <span class=\"_ _e\"></span>option. Certainly, <span class=\"_ _4b\"></span>whe<span class=\"_ _e\"></span>re it <span class=\"_ _2\"></span>relates <span class=\"_ _2\"></span>to <span class=\"_ _2\"></span>office rent <span class=\"_ _2\"></span>contracts, th<span class=\"_ _2\"></span>e <span class=\"_ _2\"></span>group makes <span class=\"_ _2\"></span>its best<span class=\"_ _2\"></span> estimate o<span class=\"_ _2\"></span>f <span class=\"_ _2\"></span>the non-cancellable <span class=\"_ _4b\"></span>p<span class=\"_ _e\"></span>eriod based <span class=\"_ _2\"></span>on all information a<span class=\"_ _2\"></span>t its disposal (see Note 6.19).<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> impacts of the COVID-19 crisis and macroeconomic developments were taken into account by the group to assess potential </span></span>effects o<span class=\"ff42\">n Elia\u2019s financial performa<span class=\"_ _2\"></span>nce. <span class=\"ff3f\">In general, as Elia<span class=\"_ _e\"></span> is acting in accordance with regulatory frameworks in Belgium and </span></span>Germ<span class=\"ls5b\">an</span>y, its profitability was not significantly affected in 2021 or 2022. During these two years, the COVID pandemic did not significantly impact th<span class=\"_ _2\"></span>e group neither in terms of financial performance nor in terms of the execution of the <span class=\"_ _e\"></span>onshore and offshore infrastr<span class=\"_ _2\"></span>ucture projects in either Belgium <span class=\"ls5b\">or</span> <span class=\"_ _e\"></span>Germany. The only exception to this was, in 2021, Elia Grid International<span class=\"ff42\">\u2019s activities, </span>since the in<span class=\"_ _2\"></span>ternational consulting business was negatively<span class=\"_ _e\"></span> impacted by the COVID-<span class=\"ls5b\">19 <span class=\"_ _e\"></span></span>restrictions, leading to a drop in its revenues. Th<span class=\"_ _2\"></span>is situation was nevertheless offset by cost control measures in COVID times. Effects on macro-econo<span class=\"_ _e\"></span>mic metr<span class=\"_ _2\"></span>ics, such as the interest rate, d<span class=\"_ _2\"></span>iscount rate, etc. - w<span class=\"_ _e\"></span>ere taken into account. The year 2022 has been more im<span class=\"_ _2\"></span>pacted by the war in Uk<span class=\"_ _e\"></span>raine and its consequences on energy prices (inflation). Given the nature a<span class=\"_ _e\"></span>nd location <span class=\"_ _e\"></span>of its <span class=\"_ _e\"></span>operations <span class=\"_ _e\"></span>and the <span class=\"_ _e\"></span>fact <span class=\"_ _e\"></span>that Elia <span class=\"_ _e\"></span>Group does no<span class=\"_ _e\"></span>t currently <span class=\"_ _e\"></span>have activities <span class=\"_ _e\"></span>in Ru<span class=\"_ _e\"></span>ssia nor<span class=\"_ _20\"></span> in Ukraine <span class=\"_ _e\"></span>or with <span class=\"_ _20\"></span>Russian <span class=\"_ _e\"></span>companies, <span class=\"_ _20\"></span>Elia <span class=\"_ _20\"></span>Group <span class=\"_ _20\"></span>has <span class=\"_ _20\"></span>not <span class=\"_ _e\"></span>observed <span class=\"_ _20\"></span>a <span class=\"_ _20\"></span>di<span class=\"_ _e\"></span>rect <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>mpact <span class=\"_ _20\"></span>of <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>Uk<span class=\"_ _e\"></span>rainian <span class=\"_ _e\"></span>c<span class=\"_ _e\"></span>onflict <span class=\"_ _20\"></span>on <span class=\"_ _20\"></span>its <span class=\"_ _e\"></span>busin<span class=\"_ _e\"></span>ess. <span class=\"_ _20\"></span>However, <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>here <span class=\"_ _20\"></span>was <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span> strong push at the <span class=\"_ _e\"></span>European <span class=\"_ _e\"></span>level to beco<span class=\"_ _e\"></span>me less dep<span class=\"_ _e\"></span>endent from <span class=\"_ _e\"></span>Russian gas a<span class=\"_ _e\"></span>nd fossil fuels <span class=\"_ _e\"></span>with a <span class=\"_ _e\"></span>willingness <span class=\"_ _e\"></span>among the aut<span class=\"_ _20\"></span>horities in <span class=\"_ _20\"></span>Belgium <span class=\"_ _e\"></span>and <span class=\"_ _e\"></span>Ge<span class=\"_ _e\"></span>rmany <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>o <span class=\"_ _20\"></span>accelerate <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>energ<span class=\"ff42\">y <span class=\"_ _20\"></span>transition. <span class=\"_ _20\"></span>This <span class=\"_ _e\"></span>led <span class=\"_ _20\"></span>to <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>n <span class=\"_ _20\"></span>increa<span class=\"_ _2\"></span>se <span class=\"_ _20\"></span>of <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>Group\u2019s <span class=\"_ _20\"></span>investment <span class=\"_ _e\"></span>p<span class=\"_ _e\"></span>rogram <span class=\"_ _e\"></span>ov<span class=\"_ _e\"></span>er <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>mid<span class=\"ff3f\">-</span></span>term.  With <span class=\"_ _e\"></span>regard <span class=\"_ _20\"></span>to <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>increasing <span class=\"_ _e\"></span>inflation <span class=\"_ _20\"></span>rates, <span class=\"_ _20\"></span>this <span class=\"_ _e\"></span>is <span class=\"_ _20\"></span>a <span class=\"_ _e\"></span>m<span class=\"_ _e\"></span>atter <span class=\"_ _20\"></span>of co<span class=\"_ _e\"></span>ncern <span class=\"_ _e\"></span>fo<span class=\"_ _e\"></span>r <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>he <span class=\"_ _e\"></span>gro<span class=\"_ _e\"></span>up <span class=\"_ _e\"></span>even<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>if <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>t <span class=\"_ _20\"></span>operates <span class=\"_ _e\"></span>under<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>regulatory <span class=\"_ _20\"></span>framewor<span class=\"_ _2\"></span>k <span class=\"_ _20\"></span>to offset m<span class=\"_ _e\"></span>ajor <span class=\"_ _e\"></span>c<span class=\"_ _e\"></span>ost <span class=\"_ _e\"></span>increases<span class=\"ls95\">. <span class=\"_ _e\"></span></span>The <span class=\"_ _e\"></span>impacts <span class=\"_ _20\"></span>of <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>current <span class=\"_ _e\"></span>market <span class=\"_ _e\"></span>volatility <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>nd <span class=\"_ _e\"></span>macroeconomic <span class=\"_ _20\"></span>deve<span class=\"_ _2\"></span>lopments <span class=\"_ _20\"></span>were <span class=\"_ _e\"></span>taken <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>nto <span class=\"_ _e\"></span>account<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>by<span class=\"_ _e\"></span> the group to <span class=\"_ _e\"></span>assess <span class=\"_ _e\"></span>potential <span class=\"_ _e\"></span>effects <span class=\"_ _e\"></span>on Elia\u2019s <span class=\"_ _e\"></span>financial <span class=\"_ _e\"></span>performance <span class=\"_ _e\"></span>and the <span class=\"_ _e\"></span>valuation of i<span class=\"_ _e\"></span>ts <span class=\"_ _e\"></span>assets a<span class=\"_ _e\"></span>nd liabilities<span class=\"_ _e\"></span><span class=\"ff3f\"> <span class=\"_ _20\"></span>(see note <span class=\"_ _e\"></span>4.4, <span class=\"_ _e\"></span>5.2, 5.3, </span>6.15 an<span class=\"_ _2\"></span>d 6.17). In particular, key <span class=\"_ _2\"></span>assumptions used in the calculation of <span class=\"_ _2\"></span>the post employments obliga<span class=\"_ _2\"></span>tions have been reviewed to ensure a proper valuation as per 31 D<span class=\"_ _e\"></span>ecember 2022<span class=\"_ _e\"></span> (see note 6.<span class=\"_ _e\"></span>14)<span class=\"ls1d\">. </span>The group<span class=\"_ _e\"></span> assessed whether its non-<span class=\"_ _e\"></span>financial assets might be impai<span class=\"_ _e\"></span>red: it<span class=\"_ _e\"></span> carried<span class=\"_ _2\"></span> <span class=\"_ _5d\"></span>out <span class=\"_ _5d\"></span>a<span class=\"_ _e\"></span>n <span class=\"_ _5d\"></span>analysis <span class=\"_ _5d\"> </span>of <span class=\"_ _24d\"> </span>potential <span class=\"_ _5d\"></span>impairment <span class=\"_ _5d\"> </span>indicat<span class=\"_ _e\"></span>ors, <span class=\"_ _5d\"> </span>i<span class=\"_ _e\"></span>n <span class=\"_ _5d\"></span>accordance<span class=\"_ _2\"></span> <span class=\"_ _5d\"></span>with <span class=\"_ _24d\"> </span>the <span class=\"_ _5d\"></span>provisions <span class=\"_ _5d\"></span>of <span class=\"_ _5d\"></span>IAS<span class=\"_ _e\"></span> <span class=\"_ _5d\"></span>36 <span class=\"_ _24d\"> </span><span class=\"ff42\">\u2013</span> <span class=\"_ _5d\"> </span>Impairment <span class=\"_ _5d\"></span>of <span class=\"_ _24d\"> </span>Assets. <span class=\"_ _5d\"></span>The impairm<span class=\"_ _2\"></span>ent test was carried out based on the last busines<span class=\"_ _e\"></span>s plan; this identified no impairment risks as per 31 Dece<span class=\"_ _e\"></span>mber 2022. The <span class=\"_ _4b\"></span>different <span class=\"_ _2\"></span>crisis <span class=\"_ _2\"></span>and, <span class=\"_ _4b\"></span>in 2022, <span class=\"_ _4b\"></span>the<span class=\"_ _e\"></span> <span class=\"_ _2\"></span>strong <span class=\"_ _4b\"></span>increase o<span class=\"_ _2\"></span>f e<span class=\"_ _2\"></span>lectricity <span class=\"_ _2\"></span>prices <span class=\"_ _4b\"></span>could result <span class=\"_ _4b\"></span>in a <span class=\"_ _4b\"></span>po<span class=\"_ _e\"></span>tentially <span class=\"_ _4b\"></span>i<span class=\"_ _e\"></span>ncreased <span class=\"_ _4b\"></span>c<span class=\"_ _e\"></span>redit <span class=\"_ _2\"></span>risk <span class=\"_ _2\"></span>and <span class=\"_ _4b\"></span>may <span class=\"_ _2\"></span>therefore affect the am<span class=\"_ _2\"></span>ount of impairment losses to be recognised <span class=\"_ _e\"></span>with respect to expected credit losses. The group has since monitored payment receipts and counterpar<span class=\"_ _2\"></span>ty risk more closely, noting no significant deterioration. We refer<span class=\"_ _2\"></span> to the following notes for more information: 6.3, 6.9, 6.19 and 8.1. 2.6. <span class=\"_ _87\"> </span>Approval by the Board of Directors These consolida<span class=\"_ _2\"></span>ted financial statements were authorised for publication by the Board of Directors on <span class=\"_ _e\"></span><span class=\"ls5b\">30 </span>March 202<span class=\"_ _e\"></span>3. 3.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Significant accounting policies</span>3.1. <span class=\"_ _87\"> </span>Basis of consolidation SUBSIDIARIES A subsidiary is a<span class=\"_ _2\"></span>n entity that is controlled by the Compan<span class=\"_ _e\"></span>y. The group controls an entity when it is exposed, or has rights, to variable return<span class=\"_ _2\"></span>s from its involvement with the entity and has the abil<span class=\"_ _e\"></span>ity to affe<span class=\"_ _2\"></span>ct those returns th<span class=\"_ _e\"></span>rough its power over the entity. The financial statements of <span class=\"_ _2\"></span>subsidiaries are included in the consolidated financial st<span class=\"_ _e\"></span>atements from the date this control commences until the date that it ceases. The a<span class=\"_ _2\"></span>ccounting policies of subsidiaries are changed when necessary, in order to align them with the policies adopted by the group<span class=\"_ _2\"></span>. Losses applicable to the non-controlling interests in a subsidiary are allocated to the non-controlling interest<span class=\"_ _e\"></span>s even if th<span class=\"_ _2\"></span>is results in a deficit <span class=\"_ _2\"></span>balance of the non-controlling interests.<span class=\"_ _e\"></span> Changes <span class=\"ls1d\">to</span> the group's interest in a non-wholly-owned subsidiary that do not result in a loss of contro<span class=\"_ _2\"></span>l are accounted for as equity transactions.<span class=\"_ _e\"></span> ASSOCIAT<span class=\"ls43\">ES</span> Associates are<span class=\"_ _2\"></span> those companies over which the Compan<span class=\"_ _e\"></span>y exerts significant in<span class=\"_ _2\"></span>fluence, but not control, in <span class=\"_ _e\"></span>terms of the<span class=\"ls1c\">ir</span> financial and opera<span class=\"_ _2\"></span>ting policies. Investments in associates are account<span class=\"_ _e\"></span>ed for in the consolida<span class=\"_ _2\"></span>ted financial statements in accordance with t<span class=\"_ _e\"></span>he equity method. They ar<span class=\"_ _2\"></span>e initially recognised in the consolidated statement of financial position at cost, with all transaction costs incurred with the acqu<span class=\"_ _2\"></span>isition included, and are adjusted t<span class=\"_ _e\"></span>hereafter to reflect the g<span class=\"ff42\">roup\u2019s share of the profit or loss and other comprehensive income of </span>the associa<span class=\"_ _2\"></span>te. This accounting under the equity method is<span class=\"_ _e\"></span> done from the date that sign<span class=\"_ _2\"></span>ificant influence commences until the<span class=\"_ _e\"></span> date that it ceases. When the group's share of the losses e<span class=\"_ _2\"></span>xceeds its interest in an associate, its carrying amount is reduced to ni<span class=\"_ _e\"></span>l and further losses are<span class=\"_ _2\"></span> not recognised except to the extent t<span class=\"_ _e\"></span>hat the group ha<span class=\"_ _2\"></span>s incurred legal or constructive obligations or has <span class=\"_ _e\"></span>made payments on behalf o<span class=\"_ _2\"></span>f an associate. INTERESTS IN JOINT VENTURES  A joint venture is an arrangement under which t<span class=\"_ _2\"></span>he gr<span class=\"_ _e\"></span>oup has joint control and has rights to the net assets of the<span class=\"_ _2\"></span> arrangement, as opposed to join<span class=\"_ _2\"></span>t operations, under which the g<span class=\"_ _e\"></span>roup has rights to its assets and ob<span class=\"_ _2\"></span>ligations for its liabilities. Interests in joint ventures are accounted for<span class=\"_ _2\"></span> using the equity method. They are initially r<span class=\"_ _e\"></span>ecognised<span class=\"_ _2\"></span> at cost price, with all transaction costs incurred with the acquisition included. <span class=\"_ _2\"></span>Subsequent to initial recognition, the consolidated financial statements include the gr<span class=\"_ _e\"></span>oup's share of the total recognised profits and losses of joint <span class=\"_ _2\"></span>ventures on the basis of the equity method, from the date that joint control commences until the <span class=\"_ _e\"></span>date that it cea<span class=\"_ _2\"></span>ses. When the group's shar<span class=\"_ _2\"></span>e of the losses exceeds its interest<span class=\"_ _e\"></span> in joint ventures,<span class=\"_ _2\"></span> its carrying amount is reduced to nil and<span class=\"_ _e\"></span> furthe<span class=\"_ _e\"></span>r losses are not re<span class=\"_ _2\"></span>cognised except to the extent that the <span class=\"_ _e\"></span>group has incurre<span class=\"_ _2\"></span>d legal or constructive obligations or has made payments on behalf of a joint venture<span class=\"ls1d\">. </span> N<span class=\"ls101\">ON</span>-CONTROLING INTERESTS  Non-controlling in<span class=\"_ _2\"></span>terests are measured in line with their pr<span class=\"_ _e\"></span>oportional share of the acquiree's identifiable net assets on the acquisition date.  LOSS OF CONTROL Upon the<span class=\"_ _2\"></span> loss of control, the group derecognis<span class=\"_ _e\"></span>es the assets and liabilities of the subsidiary, any non-controlling interests and the other components o<span class=\"_ _2\"></span>f other comprehensive income related to the subsidiary. Any surplus or deficit arising on the loss of control is recogn<span class=\"_ _2\"></span>i<span class=\"_ _e\"></span>s<span class=\"_ _e\"></span><span class=\"ls5b\">ed </span>in profit or loss.<span class=\"_ _2\"></span> If the group retains any interest in the fo<span class=\"_ _e\"></span>rmer subsidiary, then such interest is measured at fair value <span class=\"_ _e\"></span><span class=\"ls5b\">on </span>the date that control is lo<span class=\"_ _2\"></span>st. Subsequently, it is accounted for as an equ<span class=\"_ _e\"></span>ity-accounted investee or as a fair value financial asset depending on the level of influen<span class=\"_ _2\"></span>ce retained. ELIMINATION OF INTRA-GROUP TRANSACTIONS Intra-group ba<span class=\"_ _2\"></span>lances and any unrealised gains or losses <span class=\"_ _e\"></span>or income and expenses arising from intra-group transactions are eliminated when prepar<span class=\"_ _2\"></span>ing the consolidated financial statements. <span class=\"_ _e\"></span> Unrealised<span class=\"_ _2\"></span> gains from transactions with associates <span class=\"_ _e\"></span>are eliminated to the extent of the group's interest in the entity. Unrealised losses are eliminated<span class=\"_ _2\"></span> in the same way as unrealised gains, but only to the extent that there is no evidence of<span class=\"_ _e\"></span> impairment.<span class=\"_ _e\"></span> BUSINESS COMBINA<span class=\"_ _2\"></span>TION AND GOODWILL<span class=\"_ _e\"></span> Goodwill arise<span class=\"_ _2\"></span>s on the acquisition of subsidiaries<span class=\"_ _e\"></span> <span class=\"ls5b\">and </span>repr<span class=\"_ _e\"></span>esents the excess of the consideration transferred over the group's interest in the net fair va<span class=\"_ _2\"></span>lue of the net identifiable assets, liabilities and contingent liabilities of the acquiree. The group<span class=\"_ _2\"></span> measures goodwill <span class=\"ls5b\">on</span> <span class=\"_ _e\"></span>the acquisition date as:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the f<span class=\"_ _2\"></span>air value of the consideration transferred; plus </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the r<span class=\"_ _2\"></span>ecognised amount of any non-controlling interest in the acquiree; plus<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">if the b<span class=\"_ _2\"></span>usiness combination is completed in stages, the fai<span class=\"_ _e\"></span>r value of the pre-existing equity interest in the acquiree; less </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the f<span class=\"_ _2\"></span>air value of the identifiable assets acquired and liabilities at acquisition date.<span class=\"_ _e\"></span> </span></span>When the excess is n<span class=\"_ _2\"></span>egative, a gain on a bar<span class=\"_ _e\"></span>gain purchase is recognised immed<span class=\"_ _2\"></span>iately in profit or loss.<span class=\"_ _e\"></span> The consider<span class=\"_ _2\"></span>ation transferred does not include amounts related to the settleme<span class=\"_ _e\"></span>nt of pre-existing relationships. Such amounts are generally reco<span class=\"_ _2\"></span>gnised in profit or loss.<span class=\"_ _e\"></span> Transa<span class=\"_ _2\"></span>ction costs incurred by the group in connection with a business combination, other th<span class=\"_ _e\"></span>an those associated with the issue of debt or equity securities, are expensed as incurred. Any contingent con<span class=\"_ _2\"></span>sideration payable is measured at fair value at the acquisition date. If the contingent consideration is classified as equity, then it is not remea<span class=\"_ _2\"></span>sured and settlement is accounted for within equity. Otherwise, subsequ<span class=\"_ _e\"></span>ent changes in the fair value of the contingent consideration are re<span class=\"_ _2\"></span>cognised in profit or loss.<span class=\"_ _e\"></span> 3.2. <span class=\"_ _87\"> </span>Foreign cu<span class=\"_ _e\"></span>rrency translati<span class=\"_ _2\"></span>on FOREIGN CURRENCY TRANSAC<span class=\"_ _2\"></span>TIONS AND BALANCES <span class=\"_ _e\"></span> Transa<span class=\"_ _2\"></span>ctions in foreign currencies are converted into the f<span class=\"_ _e\"></span>unctional currency of the Company <span class=\"_ _2\"></span>at the foreign exchan<span class=\"_ _e\"></span>ge rate on the date of the transaction<span class=\"_ _2\"></span>. Monetary assets and liabilities denominated in foreign currencies on the <span class=\"_ _e\"></span>reporting date are converted at the foreign exchange rate on that date. For<span class=\"_ _2\"></span>eign exchange differences arising on conversion are recognised in profit or loss.<span class=\"_ _e\"></span> Non-monetar<span class=\"_ _2\"></span>y assets and liabilities denominated in foreign currencies that are valued in terms of historical cost are converted <span class=\"_ _e\"></span>at the exchange rate on the d<span class=\"_ _2\"></span>ate of the transaction.<span class=\"_ _e\"></span> FOREIGN OPERATIONS A foreign operation is an en<span class=\"_ _2\"></span>tity that is a subsidiary, an ass<span class=\"_ _e\"></span>ociate, an interest in a joint venture or <span class=\"ls78\">a </span>b<span class=\"_ _2\"></span>ranch of the reporting entity whose activities are<span class=\"_ _2\"></span> based or conducted in a count<span class=\"_ _e\"></span>ry or currency other than those of the reporting entity. The financial sta<span class=\"_ _2\"></span>tements of all group entities that have a f<span class=\"_ _e\"></span>unctional currency which differ from the group's presentation currency are translated into<span class=\"_ _2\"></span> the presentation currency as follows:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">assets a<span class=\"_ _2\"></span>nd liabilities are translated at the exchange rate at the reporting date;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">income<span class=\"_ _2\"></span> and expenses are translated at the average exchange rate of the year. </span></span>Exchange d<span class=\"_ _2\"></span>ifferences arising from the translation of the net investment in foreign subsidiaries, i<span class=\"_ _e\"></span>nterests in joint ventures and associates at closing e<span class=\"_ _2\"></span>xchange rates are included in shareholder's e<span class=\"_ _e\"></span>quity under OCI. Upon the (partial) disposal of foreign subsidiaries, joint venture<span class=\"_ _2\"></span>s and associates, (partial) cumulative translation a<span class=\"_ _e\"></span>djustments are recognised in the profit or loss as part of the gain or loss on the sale. 3.3. <span class=\"_ _87\"> </span>Statement of financial position3.3.1 <span class=\"_ _36\"> </span>Property, plant and equipment Owned <span class=\"_ _e\"></span>assets Items of property, plant <span class=\"_ _2\"></span>and equipment a<span class=\"_ _e\"></span>re stated at historical cost (including the directly allocated costs such as finance costs), less accumulated depre<span class=\"_ _2\"></span>ciation and impairment losses (see Se<span class=\"_ _e\"></span>ction 3.3.7. 'Impairment of non-financial assets'). The cost of self-produced assets comprises the cost<span class=\"_ _2\"></span> of materials, direct labour and, where relevant, the initial estimate of the cost<span class=\"_ _2\"></span>s of dismant<span class=\"_ _e\"></span>ling and <span class=\"_ _e\"></span>removing the assets<span class=\"_ _2\"></span> and restoring the site on which the assets wer<span class=\"_ _e\"></span>e located. If parts of an item of property, plant and equipment have different useful lives, t<span class=\"_ _2\"></span>hey are accounted for as separate items of property, plant and equipment.<span class=\"_ _e\"></span> Borrowing c<span class=\"_ _2\"></span>osts that are directly attributable to the construction of the qualifying asset are capitalis<span class=\"_ _e\"></span>ed as part of the cost of <span class=\"_ _2\"></span>that asset. <span class=\"_ _e\"></span> Subsequen<span class=\"_ _e\"></span>t costs The Group recognises in t<span class=\"_ _2\"></span>he carrying amount of an item of property, plant and equipment the subsequent costs of replacing par<span class=\"_ _e\"></span>t of such an item when that cost<span class=\"_ _2\"></span> is incurred, but only when it is pro<span class=\"_ _e\"></span>bable that the future economic benefit<span class=\"_ _2\"></span>s embodied in the item w<span class=\"_ _e\"></span>ill flow to the Group and t<span class=\"_ _2\"></span>he cost of the item can be measured reliably. All other costs, such as repair and maintenance costs, are recognised in <span class=\"_ _e\"></span>profit or loss as and when th<span class=\"_ _2\"></span>ey are incurred.<span class=\"_ _e\"></span> Depr<span class=\"_ _e\"></span>eciation Depreciation is re<span class=\"_ _2\"></span>cognised in profit or loss on a straight-li<span class=\"_ _e\"></span>ne basis over the estimated useful life of each component of an item of property, plant and eq<span class=\"_ _2\"></span>uipment. Land is not depreciated. The applied depreciation percentages can be found in the <span class=\"_ _e\"></span>bullet points below. Depreciation me<span class=\"_ _2\"></span>thods, remaining useful lives a<span class=\"_ _e\"></span>nd residual values of property, p<span class=\"_ _2\"></span>lant and equipment are reassessed annually and are prospe<span class=\"_ _2\"></span>ctively adjusted as the occasion arises.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Administr<span class=\"_ _2\"></span>ative buildings <span class=\"_ _20\"></span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>1.67 <span class=\"ff42\">\u2013</span> 2.00%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Indu<span class=\"_ _2\"></span>strial buildings <span class=\"_ _14d\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>2.00 <span class=\"ff42\">\u2013</span> 4.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Overh<span class=\"_ _2\"></span>ead lines <span class=\"_ _a6\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>2.00 <span class=\"ff42\">\u2013</span> 4.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Under<span class=\"_ _2\"></span>ground cables <span class=\"_ _62\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>2.00 <span class=\"ff42\">\u2013</span> 5.00%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Substatio<span class=\"_ _2\"></span>ns (facilities and machines) <span class=\"_ _a2\"> </span> <span class=\"_ _121\"> </span>2.50 <span class=\"ff42\">\u2013</span> 6.67% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Remote<span class=\"_ _2\"></span> control <span class=\"_ _13e\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span>3.00 <span class=\"ff42\">\u2013</span> 12.50<span class=\"_ _2\"></span>%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Dispatchin<span class=\"_ _2\"></span>g <span class=\"_ _7b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>4.00 <span class=\"ff42\">\u2013</span> 10.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Other<span class=\"_ _2\"></span> PPE (fitting out rented buildings)<span class=\"_ _e\"></span> <span class=\"_ _235\"> </span> <span class=\"_ _121\"> </span>contr<span class=\"_ _2\"></span>actual period </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Vehicles <span class=\"_ _139\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span>6.67 <span class=\"ff42\">\u2013<span class=\"_ _2\"></span><span class=\"ff3f\"> 20.00% </span></span></span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Too<span class=\"_ _2\"></span>ls and office furniture <span class=\"_ _12\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>6.67 <span class=\"ff42\">\u2013</span> 20.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Hardwa<span class=\"_ _2\"></span>re <span class=\"_ _14b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>25.00 <span class=\"ff42\">\u2013</span> 33.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Right o<span class=\"_ _2\"></span>f use assets <span class=\"_ _14e\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>contractual period </span></span>Decommi<span class=\"_ _e\"></span>ssioning an <span class=\"lsff\">asset</span> In accordance<span class=\"_ _2\"></span> with IAS 16, when the entity has a present,<span class=\"_ _e\"></span> legal or<span class=\"_ _2\"></span> constructive obligation to dismantle the item or restore t<span class=\"_ _e\"></span>he site, the initial cost of <span class=\"_ _2\"></span>the item of property, plant and equipment includes an initial estimate of the costs of dismantling and <span class=\"_ _e\"></span>removing the item and restoring the<span class=\"_ _2\"></span> site on which it is located. A corresponding provision for this obligation is recorded for the amount of the as<span class=\"_ _e\"></span>set component (the d<span class=\"_ _2\"></span>ismantling asset) and depreciated over <span class=\"_ _e\"></span>the asset's entire useful life (see also 3.3.13 Provisions).<span class=\"_ _e\"></span> Derecognition An asset is no<span class=\"_ _2\"></span> longer recognised when it is s<span class=\"_ _e\"></span>ubject to disposal or when no future economic benefits are expected from its u<span class=\"_ _2\"></span>se or disposal. Ga<span class=\"_ _2\"></span>ins or losses arising from the derecognition of the asset (determined as the difference b<span class=\"_ _e\"></span>etween the net disposal proceeds and the carr<span class=\"_ _2\"></span>ying amount of the asset) are included in profit or loss, under other income<span class=\"_ _e\"></span> or other expenses, during the year in which the asset was derecognised. <span class=\"fs11\"> </span>3.3.2 <span class=\"_ _36\"> </span>Intangible assets Computer software Software licen<span class=\"_ _2\"></span>ces acquired by the group are stated at cost, less accumulated amortisation (see below) and impairment losses (see Section 3.3.7. 'Impairmen<span class=\"_ _2\"></span>t'<span class=\"ls8f\">).<span class=\"_ _e\"></span></span> Expenditur<span class=\"_ _2\"></span>e <span class=\"ls5b\">on <span class=\"_ _e\"></span></span>research activities undertaken with the purpose of developing software within the group is recognised in profit or loss as it is incurred. Expenditure<span class=\"_ _2\"></span> related to the d<span class=\"_ _e\"></span>evelopment phase of software developed within the group is capitalised if:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the co<span class=\"_ _2\"></span>sts of development can be measured reliably;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the so<span class=\"_ _2\"></span>ftware is technically and commercially feasible and future economic benefits are probable;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the g<span class=\"_ _2\"></span>roup plans <span class=\"ff42\">\u2013</span> and has sufficient resources <span class=\"ff42\">\u2013</span> to complete development;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the g<span class=\"_ _2\"></span>roup plans to use the software. </span></span>The capitalised e<span class=\"_ _2\"></span>xpenditure includes t<span class=\"_ _e\"></span>he cost of material, direct labour<span class=\"_ _2\"></span> costs and overhead costs that are directly attributable to preparing t<span class=\"_ _2\"></span>he software for its use. Other costs are recognised in profit or loss as they are incurred. Licen<span class=\"_ _e\"></span>ces, patents and similar rights<span class=\"_ _2\"></span> Expenditur<span class=\"_ _2\"></span>e on acquired licences, patents, trademarks an<span class=\"_ _e\"></span>d similar r<span class=\"_ _2\"></span>ights are capitalised and amortised on a straight<span class=\"_ _20\"></span>-line b<span class=\"_ _2\"></span>asis over the contractual period, <span class=\"_ _2\"></span>if any, or the estimated useful life.<span class=\"_ _e\"></span> Subsequen<span class=\"_ _e\"></span>t expenditu<span class=\"_ _2\"></span>re Subsequent expenditure on capitalised intang<span class=\"_ _2\"></span>ible assets is capitalised only when it increases the future economic benefits embodied in the specific a<span class=\"_ _2\"></span>sset to which it relates. All other expenditure is recognised in profit or loss as it<span class=\"_ _e\"></span> is incurred. Amortisation Amortisation<span class=\"_ _2\"></span> is recognised in profit or loss on a straight-li<span class=\"_ _e\"></span>ne basis over the estimated useful life of intangible assets, unless the useful life is indefinite<span class=\"_ _2\"></span>. Goodwill and intangible assets with indefinite useful lives are tested systematically for impairment on e<span class=\"_ _e\"></span>ach end of the repor<span class=\"_ _2\"></span>ting period. Software is amortised from the date it b<span class=\"_ _e\"></span>ecomes available for use. The estimated useful lives are as follows: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Licence<span class=\"_ _2\"></span>s <span class=\"_ _13b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>20.00%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Concessio<span class=\"_ _2\"></span>ns <span class=\"_ _59\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>contractual period </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Compu<span class=\"_ _2\"></span>ter software <span class=\"_ _13b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span><span class=\"ls1d\">   </span>20.00 <span class=\"ff42\">\u2013</span> 25.00% </span></span>Depreciation me<span class=\"_ _2\"></span>thods, remaining useful lives and residual<span class=\"_ _e\"></span> values of <span class=\"_ _2\"></span>intangible assets are reassessed annually and are prospectively adjusted as the<span class=\"_ _2\"></span> occasion arises.<span class=\"_ _e\"></span> Derecognition An intangible<span class=\"_ _2\"></span> asset is derecognised upon disposal (i.e., the date <span class=\"_ _e\"></span>upon which the recipient obtains control of it) or wh<span class=\"_ _e\"></span>en no future econom<span class=\"_ _2\"></span>ic benefits are expected from its use or disposal. Any gain or loss arising upon derecognition of the asset (calculated as the differen<span class=\"_ _2\"></span>ce between the net disposal proceeds and the carrying amount of the asset) is included in the statement of profit or <span class=\"_ _e\"></span>loss. 3.3.3 <span class=\"_ _36\"> </span>Goodwill Goodwill is state<span class=\"_ _2\"></span>d at cost, less accumulated impairment l<span class=\"_ _e\"></span>osses. Goodwill is allocated to cash-generating units and is not amortised but is tested annua<span class=\"_ _2\"></span>lly for impairment (see Section <span class=\"_ _e\"></span>3.3.7 'Impairment of non-financial assets'). In the case of associates, the carrying amount of good<span class=\"_ _2\"></span>will is included in the carrying amount of the invest<span class=\"_ _e\"></span>ment in the a<span class=\"_ _2\"></span>ssociates.<span class=\"_ _e\"></span> 3.3.4 <span class=\"_ _36\"> </span>Trade and other receivables Contract assets<span class=\"fc1b\"> </span>Revenue arising from<span class=\"_ _2\"></span> third party services (see Note 3.4.<span class=\"_ _e\"></span>1) and associated costs are recognised over time as we ha<span class=\"_ _e\"></span>ve the right to consideration for wor<span class=\"_ _2\"></span>k performed but not billed. Prog<span class=\"_ _e\"></span>ress is determ<span class=\"_ _2\"></span>ined based on the costs incurred.<span class=\"_ _e\"></span> The contract<span class=\"_ _2\"></span> assets primarily relate to the g<span class=\"ff42\">r<span class=\"_ _e\"></span>oup\u2019s rights to consideration for work completed<span class=\"_ _2\"></span> but not billed at the reporting dat<span class=\"ff3f\">e <span class=\"_ _e\"></span>on </span></span>project work. The con<span class=\"_ _2\"></span>tract assets are transferred to receiv<span class=\"_ _e\"></span>ables when<span class=\"_ _2\"></span> the rights become unconditional. This usually occurs wh<span class=\"_ _e\"></span>en the group<span class=\"_ _2\"></span> issues an invoice to the customer. Contract assets <span class=\"_ _e\"></span>are included in trade and other receivables. Levies In its role<span class=\"_ _2\"></span> as T<span class=\"ls27\">SO<span class=\"ff42 ls1c\">\u2019s</span></span>, Elia Transmission Belgium SA/NV and 50Hertz Transmission<span class=\"_ _2\"></span> GmbH are<span class=\"_ _e\"></span> subject to various public service obligation<span class=\"_ _2\"></span>s imposed by the<span class=\"ls1c\">ir</span> respective governments and/<span class=\"_ _e\"></span>or by regulation mechanisms. These identify public service obligations in various areas (such as promoting the u<span class=\"_ _2\"></span>se of <span class=\"_ _e\"></span>renewable energy, social sup<span class=\"_ _2\"></span>port, fees for the use of the public domain, offshore liabilities<span class=\"_ _e\"></span><span class=\"ls8f\">) </span>that should be<span class=\"_ _2\"></span> fulfilled by TSO<span class=\"ff42\">\u2019</span>s. The costs incurred by T<span class=\"_ _e\"></span>SOs as they undertake these obligations are fully covered by th<span class=\"ff42\">e tariff \u2018levies\u2019 </span>appro<span class=\"_ _2\"></span>ved by the regulators in Belgium and Germany. <span class=\"_ _e\"></span>The amounts outs<span class=\"_ _2\"></span>tanding (deficit<span class=\"_ _e\"></span>) are reported as a trade and other receivables.  Throughout this process<span class=\"ls1d\">, </span>as <span class=\"ff42\">the TSO\u2019s</span> are agents, the Group opted for a net presentation both at profit or loss and at balance sheet level. The<span class=\"_ _2\"></span>se transactions are fully <span class=\"ff42\">\u201cpassed through\u201d</span>.<span class=\"_ _e\"></span> See also N<span class=\"ls5b\">ot</span>e 9.1.<span class=\"ls5b\">4.</span> Trade and other receivables<span class=\"fc1b\"> </span>Trade rece<span class=\"_ _2\"></span>ivables and other receivables are measured at <span class=\"_ _e\"></span>amortised cost minus the appropriate allowance for amounts regarded as unreco<span class=\"_ _2\"></span>verable.<span class=\"_ _e\"></span> Impairment For trade<span class=\"_ _2\"></span> receivables and contract assets, the group a<span class=\"_ _e\"></span>pplies a simplified approach when calculating the Expected Credit Losses (ECLs). The impairment model is based on th<span class=\"_ _2\"></span>e expected credit lo<span class=\"_ _e\"></span>ss model. An individual approach is used for customer<span class=\"_ _2\"></span>s a<span class=\"_ _e\"></span>nd other counterpartie<span class=\"_ _2\"></span>s, for which the change in credit risk is monitored on an individual basis.<span class=\"_ _e\"></span> See N<span class=\"ls5b\">ot</span><span class=\"ff42\">e 8.1 \u2018Credit risk\u2019, for a detailed description of the model</span>.<span class=\"fs11\"> </span>3.3.5 <span class=\"_ _36\"> </span>Inventories Inventories (spare parts) ar<span class=\"_ _2\"></span>e stated at the lower of cost and net realisable value. Net realisable value is the estimated sel<span class=\"_ _e\"></span>ling price min<span class=\"_ _e\"></span>us the estimated c<span class=\"_ _2\"></span>osts of completion and selling expenses. <span class=\"_ _e\"></span>The cost of inventor<span class=\"_ _2\"></span>ies is based on the weighted<span class=\"_ _e\"></span>-average<span class=\"_ _e\"></span>-cost-price me<span class=\"_ _2\"></span>thod. The co<span class=\"_ _2\"></span>st includes the expenditure incurred in acquiring the inventories and the direct costs of <span class=\"_ _e\"></span>bringing them to their location and making them opera<span class=\"_ _2\"></span>tional.<span class=\"_ _e\"></span> Write-down<span class=\"_ _2\"></span>s of inventories to net realisable value are recognised in the period i<span class=\"_ _e\"></span>n which the write-offs occurred.<span class=\"fs11\"> </span>3.3.6 <span class=\"_ _36\"> </span>Cash and cash equivalents Cash and cash equivalen<span class=\"_ _2\"></span>ts comprise cash balances, bank balances, commercial paper and deposits that can be withdra<span class=\"_ _2\"></span>wn on deman<span class=\"_ _e\"></span>d. Overdrafts that ar<span class=\"_ _2\"></span>e repayable on demand for<span class=\"_ _e\"></span>m an integral part of the group's cash management <span class=\"ls5b\">and <span class=\"_ _e\"></span></span>are included as a component of cash and<span class=\"_ _2\"></span> cash equivalents for the purpose of the statement of cash flows.<span class=\"_ _e\"></span><span class=\"fs11\"> </span>3.3.7 <span class=\"_ _36\"> </span>Impairment of non-fin<span class=\"_ _e\"></span>ancial assets The carrying<span class=\"_ _2\"></span> amount of the group's assets, excluding inve<span class=\"_ _e\"></span>ntories and deferred taxes, <span class=\"ls1c\">is</span> reviewed at the end of the reporting period for each asse<span class=\"_ _2\"></span>t to determine whether there is any indication of impairment. If any such indication exists, the recoverable amount <span class=\"_ _e\"></span>of the asset is estimated. The recoverable amou<span class=\"_ _2\"></span>nt of goodwill and intangible assets wi<span class=\"_ _e\"></span>th an indefinite u<span class=\"_ _2\"></span>seful life and intangible assets that are not yet<span class=\"_ _e\"></span> available for use is estimated a<span class=\"_ _2\"></span>t the end of each reporting period.<span class=\"_ _e\"></span> An impairment loss <span class=\"_ _2\"></span>is recognised whenever the carrying amount <span class=\"_ _e\"></span>of such <span class=\"ls5b\">an </span>asset o<span class=\"_ _e\"></span>r its cash-generating unit exceeds its recoverable amoun<span class=\"_ _2\"></span>t. Impairment losses are recognised in profit or loss. Recognised impairment losses relating to cash<span class=\"_ _e\"></span>-generating units are allocated f<span class=\"_ _2\"></span>irst to reduce the carrying amount of any goodwil<span class=\"_ _e\"></span>l allocated to cash-generating units and then to redu<span class=\"_ _2\"></span>ce <span class=\"_ _e\"></span>the carrying amount of the other<span class=\"_ _2\"></span> assets in the units on a pro-rata basis.<span class=\"_ _e\"></span> After recognition<span class=\"_ _2\"></span> of impairment losses, the depreciation costs for the asset will be p<span class=\"_ _e\"></span>rospectively adjusted. Calculation of the r<span class=\"_ _e\"></span>ecoverable amo<span class=\"_ _2\"></span>unt The recoverable amou<span class=\"_ _2\"></span>nt of intangible assets and property, plant and equipment is determined as the higher of their fair value l<span class=\"_ _e\"></span>ess costs of disposa<span class=\"_ _2\"></span>l <span class=\"ls5b\">and <span class=\"_ _e\"></span></span>their value in use. In assessing value in u<span class=\"_ _e\"></span>se, the e<span class=\"_ _2\"></span>xpected future cash flows are discounted to their <span class=\"_ _e\"></span>presen<span class=\"_ _2\"></span>t value using a pre-tax discount rate t<span class=\"_ _2\"></span>hat reflects both the current market assessment of the time value of money and the risks specific to the asset.<span class=\"_ _e\"></span> Th<span class=\"ls0\">e group's assets do not generate cash flows that are independent from other assets. The recoverable amount is therefore determined<span class=\"_ _2\"></span> </span>for the cash-generating<span class=\"_ _2\"></span> unit (i.e. the entire high<span class=\"_ _e\"></span>-voltage grid) to which the a<span class=\"_ _2\"></span>sset belongs. This is also the level at wh<span class=\"_ _e\"></span>ich the group administers its go<span class=\"_ _2\"></span>odwill and gathers the economic be<span class=\"_ _e\"></span>nefits of acquired goodwill. Reversal<span class=\"_ _e\"></span>s of impai<span class=\"_ _2\"></span>rment An impairment loss with respect <span class=\"ls1d\">to</span> goodwill is not reversed. Impairment loss on<span class=\"_ _2\"></span> other assets is reversed if there have been changes in the estimates u<span class=\"_ _2\"></span>sed to determine the recoverable amount.<span class=\"_ _e\"></span> An impairment loss <span class=\"_ _2\"></span>is reversed only to the extent that the asset's carrying amount does not exceed the carrying am<span class=\"_ _e\"></span>ount that would have been determined<span class=\"_ _2\"></span>, net of depreciation or amortisation, if no <span class=\"_ _e\"></span>impairment loss had been recognised.<span class=\"fs11\"> </span>3.3.8 <span class=\"_ _148\"> </span>Financial assets Initial recognition and measurement The classifica<span class=\"_ _2\"></span>tion of financial assets at i<span class=\"_ _e\"></span>nitial recognition depends on their contractual cash flow characteristics and the g<span class=\"ff42\">roup\u2019s busines</span>s model for managing them. T<span class=\"_ _2\"></span>he group initially measures a <span class=\"_ _e\"></span>financial asset at its fair value plus transaction costs. Su<span class=\"_ _e\"></span>b<span class=\"_ _e\"></span>seq<span class=\"_ _e\"></span>u<span class=\"_ _e\"></span>en<span class=\"_ _e\"></span>t <span class=\"_ _e\"></span>m<span class=\"_ _e\"></span>e<span class=\"_ _e\"></span>asu<span class=\"_ _e\"></span>r<span class=\"_ _e\"></span>em<span class=\"_ _e\"></span>en<span class=\"_ _e\"></span>t<span class=\"ff3f\"> </span>For purpo<span class=\"_ _2\"></span>ses of subsequent measurement, financial assets are classified in three c<span class=\"_ _e\"></span>ategories: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Fina<span class=\"_ _2\"></span>ncial assets at amortised cost (debt instruments)<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Fina<span class=\"_ _2\"></span>ncial assets measured at fair value through OCI (equity instruments)<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Fina<span class=\"_ _2\"></span>ncial assets measured at fair value through profit and loss </span></span>Financial <span class=\"_ _e\"></span>assets at<span class=\"_ _2\"></span> amortised cost Financial a<span class=\"_ _2\"></span>ssets at amortised cost are managed wit<span class=\"_ _e\"></span>h a view to holding them to maturity and collecting<span class=\"_ _2\"></span> contractual cash flows. The financial asse<span class=\"_ _2\"></span>ts give rise to cash flows th<span class=\"_ _e\"></span>at are solely payments of principal and interest on the principal amount outstanding<span class=\"_ _2\"></span>.<span class=\"_ _e\"></span> Financial a<span class=\"_ _2\"></span>ssets at amortised cost are subsequently <span class=\"_ _e\"></span>measured using the Effective Interest Rate (EIR) method and are subject to impairm<span class=\"_ _2\"></span>ent. Gains and losses are recognised in profit or l<span class=\"_ _e\"></span>oss when the asset is derecogn<span class=\"_ _2\"></span>ised, modified or impaired.<span class=\"_ _e\"></span> The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s financial assets at amortised cost i<span class=\"ff3f\">nclude l<span class=\"_ _e\"></span>oans to third parties. </span></span>Financial <span class=\"_ _e\"></span>assets measured at fair value through OCI (equity instruments FVOCI) Upon initial recogn<span class=\"_ _2\"></span>ition, the group irrevocably classifies it<span class=\"_ _e\"></span>s equity inve<span class=\"_ _2\"></span>stments as equity instruments <span class=\"_ _e\"></span>measured at fair value through OCI when the<span class=\"_ _2\"></span> group does not have significant influence and th<span class=\"_ _e\"></span>e assets are not held for trading. <span class=\"ls7c\">Th<span class=\"ls1c\">is</span></span> cl<span class=\"_ _e\"></span>assification is determined on an instrument-<span class=\"ls5b\">by</span>-instrument basis. Gains and<span class=\"_ _2\"></span> losses on these financial assets are never recycl<span class=\"_ _e\"></span>ed to profit or loss. Dividends are recognised as other income in the statement of <span class=\"_ _2\"></span>profit or loss when the right of payment has been established, except when the g<span class=\"_ _e\"></span>roup benefits from such proceeds as a recover<span class=\"_ _2\"></span>y of part of the cost of the financial asset, in which<span class=\"_ _e\"></span> case <span class=\"ls5b\">any</span> such gains are recorded in OCI. Equity instruments me<span class=\"_ _e\"></span>asured at fair value through OCI are no<span class=\"_ _2\"></span>t subject to impairment assessment. <span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> has elected to irrevocably classify <span class=\"_ _e\"></span><span class=\"ls5b\">non</span>-listed equity investments over which the group does not have significant influence in this category.  Financial <span class=\"_ _e\"></span>assets mea<span class=\"_ _2\"></span>sured at fair value through profit and loss<span class=\"_ _e\"></span> (FVTPL) All financial assets not cla<span class=\"_ _2\"></span>ssified as measured at amortised cost or FVOCI as described above are measured at FVTPL<span class=\"_ _e\"></span> Impairmen<span class=\"_ _e\"></span>t of financ<span class=\"_ _2\"></span>ial assets<span class=\"ff3f\"> </span>The group<span class=\"_ _2\"></span> recognises an allowance for expected credit losses (ECLs) for its debt instruments.<span class=\"_ _e\"></span> See Note 8.1 <span class=\"ff42\">\u2018</span>Credit risk<span class=\"ff42 ls1c\">\u2019,</span> for a detailed description of the ap<span class=\"_ _2\"></span>proach<span class=\"_ _e\"></span> 3.3.9 <span class=\"_ _36\"> </span>Derivative financial instruments and hedg<span class=\"_ _e\"></span>e accounting Deri<span class=\"_ _e\"></span>vative financia<span class=\"_ _2\"></span>l instruments The group<span class=\"_ _2\"></span> sometimes uses derivative financial instruments to hedge its exposure to foreign exchange, interest rat<span class=\"_ _e\"></span>e and commodity prices risks arising from oper<span class=\"_ _2\"></span>ating, financing and investment activities. In accordance with its treasury policy, the gr<span class=\"_ _e\"></span>oup neither holds nor issues der<span class=\"_ _2\"></span>ivative financial instruments for trading purposes. However, derivatives that do not qualify for hedge accounti<span class=\"_ _e\"></span>ng are accounted for as in<span class=\"_ _2\"></span>struments held for trading purposes.<span class=\"_ _e\"></span> Derivative fin<span class=\"_ _2\"></span>ancial instruments are initially rec<span class=\"_ _e\"></span>ognised at fair value. Any gain or loss resulting from changes in the fair valu<span class=\"_ _2\"></span>e is immediately boo<span class=\"_ _2\"></span>ked in the statement of profit or loss. Wh<span class=\"_ _e\"></span>ere derivative financial instruments qualify for<span class=\"_ _2\"></span> hedge accounting, the reflection of any resulting<span class=\"_ _2\"></span> gain or loss depends on the nature of the <span class=\"_ _e\"></span>item being hedged. The fa<span class=\"_ _2\"></span>ir value of interest <span class=\"_ _e\"></span>rate swaps is the estimated amount that the group would receive or pay to terminate the swap at the end of the repor<span class=\"_ _2\"></span>ting period, taking into account the current interest rates and the current creditworthiness of t<span class=\"_ _e\"></span>he swap counterparties and the group<span class=\"_ _2\"></span>. The fair value of forward exchange contracts is the<span class=\"_ _e\"></span>ir quoted market price at the end of the reporting period, i.e. the present value of the quoted for<span class=\"_ _2\"></span>ward price.<span class=\"_ _e\"></span> Deri<span class=\"_ _e\"></span>vatives used as <span class=\"_ _2\"></span>hedging instruments Cash flow hedges Changes in<span class=\"_ _2\"></span> the fair value of the derivative hedging instrument designated as a cash-flow hedge a<span class=\"_ _e\"></span>re recognised directly in OCI to the extent that the hedge is e<span class=\"_ _2\"></span>ffective. If the hedge is ineffective, changes in fair value are recognised in profit or loss.<span class=\"_ _e\"></span> Th<span class=\"ls0\">e group uses forward currency contracts as hedges of its exposure to foreign currency risk in forecast transactions and firm </span>commitments, a<span class=\"_ _2\"></span>s well as forward commodity contracts for its exposure to volatility in the commodity prices. <span class=\"_ _e\"></span>The group designates only the spot element of <span class=\"_ _2\"></span>forward contracts as a hedged risk. The forward element is considered the cost of hedging and is<span class=\"_ _e\"></span> recognised in OCI and accumulated in a<span class=\"_ _2\"></span> separate component of the stateme<span class=\"_ _e\"></span>nt of financial position under hedging reserves. If the hedging instrumen<span class=\"_ _2\"></span>t no longer meets the criteria for hedge accounting, expires or is sold, terminated or exercised, hedge accounting is pro<span class=\"_ _2\"></span>spectively discontinued. The cumulative gain or loss previously recognised in OCI remains there until the fo<span class=\"_ _e\"></span>recast transact<span class=\"_ _2\"></span>ion occurs. When the hedged item is a non-fina<span class=\"_ _e\"></span>ncial asset, the amount recognised in OCI is transferred, where justified, to the carrying<span class=\"_ _2\"></span> amount of the asset. In other cases, the amount <span class=\"_ _e\"></span>recogn<span class=\"_ _2\"></span>ised in OCI is transferred to profit or loss in the same peri<span class=\"_ _e\"></span>od that the hedged item affects <span class=\"_ _2\"></span>profit or loss.<span class=\"_ _e\"></span> When a derivative or h<span class=\"_ _2\"></span>edge relationship is terminated, cumulative gains or losses still remain in OCI, provided that <span class=\"_ _e\"></span>the hedged transact<span class=\"_ _2\"></span>ion is still expected to occur. If the hedged transaction is no longer expected to take place, the cumulative unrealised gain or loss is remo<span class=\"_ _2\"></span>ved from OCI and is immediately recognised in profit or loss. The group<span class=\"_ _2\"></span> recognises derivatives to hedge the price for the future procurement of the physical requirement for grid losses t<span class=\"_ _e\"></span>hat is expected<span class=\"_ _2\"></span> in subsequent periods and is covered in each case by short-term procurement transactions on the spot <span class=\"_ _e\"></span>market.<span class=\"_ _2\"></span> These derivatives are measured at fair<span class=\"_ _2\"></span> value in OCI with no effect on profit or loss as part of cash flow hedge accounting; they se<span class=\"_ _e\"></span>rve as price hedging<span class=\"_ _2\"></span> of the physical demand for electrical energy to cover grid losses (underlying transaction). Due to the availability a<span class=\"_ _e\"></span>nd liquidity of future<span class=\"_ _2\"></span>s trading, the hedging period for intended price hedging covers a period of up to two years from the balance <span class=\"_ _e\"></span>sheet date. In this context, the group<span class=\"_ _2\"></span> pursues a conservative hedging strategy oriented towards the regulatory framework and the ability to roll over the electricity procur<span class=\"_ _2\"></span>ement costs incurred, which enables timely and predictable price hedgin<span class=\"_ _e\"></span>g.  The cr<span class=\"_ _2\"></span>itical term match method measures effectiveness. If the valuation-<span class=\"_ _e\"></span>relevant parameters of the hedged item and hedging instrument match, it <span class=\"_ _2\"></span>is assumed that an effective hedging relationship exists and that changes in value from both items <span class=\"_ _e\"></span>offset each other. The group strives for<span class=\"_ _2\"></span> full price hedging of the expected volume of grid loss energy (hedge ratio 1:1).<span class=\"_ _20\"></span> Hedging o<span class=\"_ _2\"></span>f monetary assets and liabilities<span class=\"_ _e\"></span> Hedge accounting is not applied<span class=\"_ _2\"></span> to derivative instruments that economically hedge monetary assets and liabilities denominated<span class=\"_ _e\"></span> in foreign<span class=\"_ _2\"></span> currencies. Changes in the fair value of such deriv<span class=\"_ _e\"></span>atives are recognised in profit or lo<span class=\"_ _2\"></span>ss <span class=\"_ _e\"></span><span class=\"ls5b\">as</span> fo<span class=\"_ _e\"></span>reign currency gains and losses. <span class=\"_ _b6\"> </span>3.3.10 <span class=\"_ _1dd\"> </span>Equity Share <span class=\"_ _e\"></span>capital <span class=\"ff43\">\u2013</span> transaction costs Transa<span class=\"_ _2\"></span>ction costs related to the issuing of capital are ded<span class=\"_ _e\"></span>ucted from the capital received. Share <span class=\"_ _e\"></span>capital <span class=\"ff43\">\u2013</span> share-based pay<span class=\"_ _2\"></span>ment expenses Share-based payment expenses are a<span class=\"_ _2\"></span>dded to the capital receiv<span class=\"ls5b\">ed.<span class=\"_ _e\"></span></span> Dividends Dividends are re<span class=\"_ _2\"></span>cognised as a liability in the period in which they are decl<span class=\"_ _e\"></span>ared (see note 6.12<span class=\"ls95\">.1<span class=\"_ _2\"></span><span class=\"ls0\">). </span></span>Hybrid securitiesHybrid securities are de<span class=\"_ _2\"></span>eply subordinated securities. With the exception of ordinary shares, hybrid securities rank as the mos<span class=\"_ _e\"></span>t junior instruments in t<span class=\"_ _2\"></span>he capital structure of the gro<span class=\"_ _e\"></span>up in an insolvency hierarchy. Hybrid securities are perpe<span class=\"_ _2\"></span>tual instruments<span class=\"_ _e\"></span> and do not default on non-payment of coupons (unless <span class=\"_ _2\"></span>such payment was mandatory following a resolution or payment of a dividend to ordinary shareholder<span class=\"_ _2\"></span>s).<span class=\"_ _e\"></span> The holder<span class=\"_ _2\"></span>s of hybrid securities have limited influence <span class=\"ls5b\">on <span class=\"_ _e\"></span></span>the outcome of a bankruptcy proceeding or restructuring outside bankruptcy. Consequently, the holders cannot oblige the group to pay distributions or redeem the securities in part or in f<span class=\"_ _2\"></span>ull. Payment of distributions on and<span class=\"_ _2\"></span> redemption of the securities is at our sole discretion.<span class=\"_ _e\"></span> In light of their characteristics, hybrid securities are classified as an equity instrument under IFRS. T<span class=\"_ _2\"></span>he associated issue costs are recognised directly in retained earnings.<span class=\"_ _e\"></span> Treasury shares When <span class=\"_ _e\"></span>shares <span class=\"_ _e\"></span>recognised <span class=\"_ _20\"></span>as <span class=\"_ _e\"></span>equity <span class=\"_ _20\"></span>are <span class=\"_ _e\"></span>repurchased, <span class=\"_ _e\"></span>the<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>amou<span class=\"_ _2\"></span>nt <span class=\"_ _e\"></span>of <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>conside<span class=\"_ _20\"></span>ratio<span class=\"_ _2\"></span>n <span class=\"_ _20\"></span>pa<span class=\"_ _2\"></span>id, <span class=\"_ _20\"></span>which inclu<span class=\"_ _e\"></span>des <span class=\"_ _e\"></span>directly<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>attributable <span class=\"_ _20\"></span>costs, is<span class=\"_ _e\"></span> recogn<span class=\"_ _2\"></span>ised <span class=\"_ _e\"></span>as <span class=\"_ _20\"></span>a <span class=\"_ _e\"></span>change <span class=\"_ _e\"></span>in <span class=\"_ _20\"></span>equity. Re<span class=\"_ _e\"></span>purchased <span class=\"_ _e\"></span>shares <span class=\"_ _20\"></span>are classified <span class=\"_ _20\"></span>as <span class=\"_ _e\"></span>treasury <span class=\"_ _e\"></span>shares <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>nd <span class=\"_ _e\"></span>are<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>deducted <span class=\"_ _e\"></span>f<span class=\"_ _e\"></span>rom <span class=\"_ _e\"></span>equity. <span class=\"_ _e\"></span>The <span class=\"_ _e\"></span>am<span class=\"_ _e\"></span>ount <span class=\"_ _e\"></span>of<span class=\"_ _e\"></span> treasur<span class=\"_ _2\"></span>y <span class=\"_ _20\"></span>shares <span class=\"_ _20\"></span>held <span class=\"_ _20\"></span>is <span class=\"_ _20\"></span>disclos<span class=\"_ _e\"></span>ed <span class=\"_ _20\"></span>in <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>treasury <span class=\"_ _20\"></span>share <span class=\"_ _20\"></span>reserve. <span class=\"_ _20\"></span>When <span class=\"_ _20\"></span>treasury <span class=\"_ _20\"></span>shares <span class=\"_ _20\"></span>are <span class=\"_ _20\"></span>subsequently<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>sold <span class=\"_ _20\"></span>or <span class=\"_ _20\"></span>reissued, <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>amount received <span class=\"_ _4b\"></span>is recognised <span class=\"_ _4b\"></span>as an <span class=\"_ _2\"></span>incre<span class=\"_ _2\"></span>ase <span class=\"_ _2\"></span>in <span class=\"_ _2\"></span>equity a<span class=\"_ _2\"></span>nd <span class=\"_ _2\"></span>the <span class=\"_ _4b\"></span>r<span class=\"_ _e\"></span>esulting <span class=\"_ _2\"></span>surplus <span class=\"_ _2\"></span>or <span class=\"_ _2\"></span>deficit <span class=\"_ _4b\"></span>o<span class=\"_ _e\"></span>n <span class=\"_ _2\"></span>the <span class=\"_ _4b\"></span>t<span class=\"_ _e\"></span>ransaction is <span class=\"_ _4b\"></span>presented within <span class=\"_ _4b\"></span>r<span class=\"_ _20\"></span>etained <span class=\"_ _4b\"></span>e<span class=\"_ _e\"></span>arnings. No gain or loss is r<span class=\"_ _2\"></span>ecognised in profit or loss on<span class=\"_ _e\"></span> the purchase, sale, <span class=\"_ _2\"></span>issue or cancellation of treasury shares.<span class=\"_ _e\"></span> Share-b<span class=\"_ _e\"></span>ased pay<span class=\"_ _2\"></span>ments The co<span class=\"_ _2\"></span>st of share-based payment transactions is reflecte<span class=\"_ _e\"></span>d in the in<span class=\"_ _2\"></span>come statement. The stock options are valued at grant date, based on the share<span class=\"_ _2\"></span> price at grant date, business evolution, exercise price and interest rates. Stock option plan cost is taken into result on a straight-<span class=\"_ _2\"></span>line basis from the grant date until the end of the vesting period.<span class=\"_ _e\"></span> 3.3.11 <span class=\"_ _1dd\"> </span>Financial <span class=\"_ _e\"></span>liabilities Financial lia<span class=\"_ _2\"></span>bilities consist of interest-b<span class=\"_ _e\"></span>earing loans and borro<span class=\"_ _2\"></span>wings in the group. They are initially r<span class=\"_ _e\"></span>ecognised at fair value, less related transact<span class=\"_ _2\"></span>ion costs. Subsequent to initial recognition, interest<span class=\"_ _e\"></span>-bearing loans and borrowings are stated at amortised c<span class=\"_ _e\"></span>ost price with any differen<span class=\"_ _2\"></span>ce between amount at initial recognition a<span class=\"_ _e\"></span>nd redemption value being recognised in profit or loss over the period of the loans on an effe<span class=\"_ _2\"></span>ctive interest basis. A financial liability is d<span class=\"_ _2\"></span>erecognised when the obligati<span class=\"_ _e\"></span>on under the liability is disch<span class=\"_ _2\"></span>arged or cancelled or expires. When an existing financial liability is replace<span class=\"_ _2\"></span>d by another from the same lender on substantially different terms, or the terms of an existing<span class=\"_ _e\"></span> liability are substantia<span class=\"_ _2\"></span>lly modified, such an exchange or modification i<span class=\"_ _e\"></span>s treated as the derecognition of the original liability and the recognition of a new liability. T<span class=\"_ _2\"></span>he difference in the respective carrying amounts is recognised in th<span class=\"_ _e\"></span>e statement of profit or loss. Financial a<span class=\"_ _2\"></span>ssets and financial liabilities are offset and the net amount is reported in the consolidated statement of financial position if there is a currently enfor<span class=\"_ _2\"></span>ceable legal right to offset the rec<span class=\"_ _e\"></span>ognised amounts and there is an inten<span class=\"_ _2\"></span>tion to settle on a net ba<span class=\"_ _e\"></span>sis, to realise the assets<span class=\"_ _2\"></span> and settle the liabilities simultaneously.<span class=\"_ _e\"></span> 3.3.12 <span class=\"_ _24f\"> </span>Employee benefits Defin<span class=\"_ _e\"></span>ed-contri<span class=\"_ _2\"></span>bution plans In Belgium, <span class=\"_ _2\"></span>contribution based promises, called defined-c<span class=\"_ _e\"></span>ontribution pension plans under Belgian pension legislatio<span class=\"_ _e\"></span>n, are c<span class=\"_ _2\"></span>lassified as defined-benefit plans for accounting purpose<span class=\"_ _2\"></span>s due to the legal minimum return to be guaranteed by the employer. <span class=\"_ _e\"></span> Before 1 <span class=\"_ _2\"></span>January 2016, the legal minimum return was 3.75%<span class=\"_ _e\"></span> on emp<span class=\"_ _2\"></span>loyee contributions, 3.25% on employe<span class=\"_ _e\"></span>r contributions and 0% for inactive plan<span class=\"_ _2\"></span> participants<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> From<span class=\"_ _2\"></span> 1 January 2016 onwards, the legal minimum return <span class=\"_ _e\"></span>is a variab<span class=\"_ _2\"></span>le rate between 1.75% and 3.75%. T<span class=\"_ _e\"></span>he interest rate is automatically adapted on <span class=\"ls5b\">1 </span>January each year based on the average return OLO 10 years over 24 months, with 1.75% as a minimum. As of <span class=\"_ _e\"></span>1 Januar<span class=\"_ _2\"></span>y 2016, the legal minimum return is 1.75% on empl<span class=\"_ _e\"></span>oyee and employer<span class=\"_ _2\"></span> co<span class=\"_ _e\"></span>ntributions and 0% for inactive plan participants.<span class=\"_ _e\"></span> As the plans <span class=\"_ _2\"></span>are funded via a pension fund, the vertical approach is applied, meaning that 1.75% is applied on all the reserves (even before 2016). The employer needs to f<span class=\"_ _2\"></span>inance the deficits related to the <span class=\"_ _e\"></span><span class=\"ff42\">\u201cLaw on Supplementary Pensions</span> (LSP) guarantee at any <span class=\"_ _e\"></span>time for the employee contract a<span class=\"_ _2\"></span>nd at the moment the vested reserve<span class=\"_ _e\"></span>s are transferred in case of departure, retirement or liquidation of the pension for the emp<span class=\"_ _2\"></span>loyer contract.<span class=\"_ _e\"></span> For each plan, th<span class=\"_ _2\"></span>e fair value of assets equals the sum of the accrued individual reserves (if any) and the value of the colle<span class=\"_ _e\"></span>ctive fund(s) (if any). The Defined-Benefit Ob<span class=\"_ _2\"></span>ligation (DBO) was determined fol<span class=\"_ _e\"></span>lowing the Pr<span class=\"_ _2\"></span>ojected Unit C<span class=\"_ _e\"></span>redit (PUC) method. The plan formula (backloaded or not) determines whether the premium<span class=\"_ _2\"></span>s are projected. <span class=\"_ _e\"></span> In Germany, the defined-<span class=\"_ _2\"></span>contribution <span class=\"_ _e\"></span>plan comprises a fixed pension to be paid to an employee upon retirement, which is usually based on one<span class=\"_ _2\"></span> or more <span class=\"ff42\">factors such as the employee\u2019s age, years of service and salary.</span>  In both<span class=\"_ _2\"></span> countries, the calculation is performed by an accr<span class=\"_ _e\"></span>edited actuary. Defin<span class=\"_ _e\"></span>ed-benefit <span class=\"_ _2\"></span>plan<span class=\"_ _e\"></span>s For defined-benefit plans, which exist in both Belgium and Germany, the pension expenses for each plan are assessed separately <span class=\"ls5b\">on </span>an annual ba<span class=\"_ _2\"></span>sis by accredited actuaries using the PUC m<span class=\"_ _e\"></span>ethod. The estimated future benefit that emplo<span class=\"_ _2\"></span>yees have <span class=\"_ _e\"></span>earned in return for their ser<span class=\"_ _2\"></span>vice in the current and previous periods is discounted to determine its present value, and the fair value of any plan assets is deducted. T<span class=\"_ _2\"></span>he discount rate is the inte<span class=\"_ _e\"></span>rest rate, at the end of the reporting period, on high quality bonds that have maturity dates appro<span class=\"_ _2\"></span>ximately equivalent <span class=\"ls1d\">to</span> th<span class=\"_ _e\"></span>e terms of the group's obligations and that are denominated in the currency in which the benefits are expected<span class=\"_ _2\"></span> to be paid. When the bene<span class=\"_ _2\"></span>fits of a plan are improved, the portion of the increased benefit relating to past service by employees is reco<span class=\"_ _2\"></span>g<span class=\"_ _e\"></span>nised as an expense in profit or lo<span class=\"_ _2\"></span>ss at the earlier of the following dates:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">when th<span class=\"_ _2\"></span>e plan amendment or curtailment occurs; or<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">when t<span class=\"_ _2\"></span>he entity recognises related restructuring costs under IAS<span class=\"_ _e\"></span> 37 or termination benefits. </span></span>Where the calcula<span class=\"_ _2\"></span>tion results in a benefit to the gr<span class=\"_ _e\"></span>oup, the recognised asset is limited to the present value of any future r<span class=\"_ _2\"></span>efunds from the plan or<span class=\"_ _2\"></span> reductions in future contributions to the plan. <span class=\"_ _e\"></span> Remeasurements <span class=\"ff42\">\u2013</span> comprising actuarial g<span class=\"_ _2\"></span>ains and losse<span class=\"_ _e\"></span>s, the effect of <span class=\"_ _2\"></span>the asset ceiling <span class=\"_ _e\"></span>(excluding amounts included in net interest on the net defined-benefit liab<span class=\"_ _2\"></span>ility<span class=\"_ _e\"></span>) and the return on plan a<span class=\"_ _2\"></span>ssets (excluding amounts included in net<span class=\"_ _e\"></span> interest on the net defined-benefit liability) <span class=\"ff42\">\u2013</span> are re<span class=\"_ _2\"></span>cognised immediately in the statement of financial position with a corresponding debit or credit to retained earnings through OCI in the period in which they occur. Remeasuremen<span class=\"_ _2\"></span>ts are not reclassified to profit or loss in subsequent periods. <span class=\"_ _e\"></span><span class=\"ff40 fs11\"> </span>Reimbur<span class=\"_ _e\"></span>sement rights (Belgium) Reimbursemen<span class=\"_ _2\"></span>t rights are recognised as a separate asset when, and only when, it is virtually certain that another par<span class=\"_ _e\"></span>ty will reimburse some or all of <span class=\"_ _2\"></span>the expenditure required to settle the corresponding benefit obligation. Rei<span class=\"_ _e\"></span>mbursement rights are presented as non-curren<span class=\"_ _2\"></span>t assets under other financial assets and are measured at fair value. <span class=\"_ _e\"></span>These rights are handled the same way as the correspondin<span class=\"_ _2\"></span>g defined-benefit obligation. When <span class=\"_ _e\"></span>the changes in the period result from changes in financial assumptions or from experien<span class=\"_ _2\"></span>ce adjustments or changes in demographic assu<span class=\"_ _e\"></span>mptions, then the asset is adjusted through OCI. The components of the defined-benefit cost are recog<span class=\"_ _2\"></span>nised net of amounts relatin<span class=\"_ _e\"></span>g to changes in the carrying amount o<span class=\"_ _2\"></span>f the rights to reimb<span class=\"_ _e\"></span>ursement.<span class=\"_ _e\"></span> Other long-term <span class=\"_ _e\"></span>employ<span class=\"_ _2\"></span>ee benefits The group<span class=\"_ _2\"></span>'s net obligation regarding long-t<span class=\"_ _e\"></span>erm service benefits other than pension plans is assessed on an annual basis by accredited actuarie<span class=\"_ _2\"></span>s. The net obligation is calculated using the PUC <span class=\"_ _e\"></span>method and is the amount of future benefit that emplo<span class=\"_ _2\"></span>yee<span class=\"_ _e\"></span>s have earned in return for<span class=\"_ _2\"></span> their service in the current and previous periods. The <span class=\"_ _e\"></span>obligation is discounted to its present value, and the fair value of any related<span class=\"_ _2\"></span> assets is deducted. The discount rate is the yield, <span class=\"_ _e\"></span>at the end o<span class=\"_ _2\"></span>f the reporting period<span class=\"_ _e\"></span>, on high quality bonds that have maturity dates appro<span class=\"_ _2\"></span>ximately equivalent to the terms of the g<span class=\"_ _e\"></span>roup's obligations and that are denominated in the currency in which the bene<span class=\"_ _2\"></span>fits are expected<span class=\"_ _2\"></span> to be paid.<span class=\"_ _e\"></span> Short-term <span class=\"_ _e\"></span>employ<span class=\"_ _2\"></span>ee benefits Short-term employe<span class=\"_ _2\"></span>e benefits are measured on an undisc<span class=\"_ _e\"></span>ounted basis and are expensed as the<span class=\"_ _2\"></span> related service is p<span class=\"_ _e\"></span>rovided. A liability is recogn<span class=\"_ _2\"></span>ised for the amount expected to be paid out under a short<span class=\"_ _e\"></span>-term cash bonus or profit-sharing plans if the group has a legal or construct<span class=\"_ _2\"></span>ive obligation to pay this amount as a result of the <span class=\"ff42\">employee\u2019s </span>past service and the obligation c<span class=\"_ _e\"></span>an be reliably estimated.<span class=\"fs11\"> </span>3.3.13 <span class=\"_ _1dd\"> </span>Provisions A provision is recogn<span class=\"_ _2\"></span>ised in the balance sheet when the g<span class=\"_ _e\"></span>roup has a current legal or constructive obligation as a result of a past event and it is likely that an<span class=\"_ _2\"></span> outflow of economic benefits <span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span> of which a reliable estimate can be made <span class=\"ff42\">\u2013</span> will be required to settle the obligation. If the e<span class=\"_ _2\"></span>ffect is material, provisions are determined by discounting the expected future cash flows at a pre<span class=\"_ _e\"></span>-tax rate that reflects the current market assessment of <span class=\"_ _2\"></span>the time value of money and, where appropriate, of the risks specific to the liability.<span class=\"_ _e\"></span> The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s main long<span class=\"ff3f\">-term provisions <span class=\"_ _e\"></span>are provisions for dismantling<span class=\"_ _2\"></span> obligations. The present value of the obligation at the time of </span></span>commissioning re<span class=\"_ _2\"></span>presents the initial amount of the provision for dismantling with, as the counterpart, an asset for the same <span class=\"_ _e\"></span>amount, which is included<span class=\"_ _2\"></span> in the carrying amount of the related pro<span class=\"_ _e\"></span>perty, plant and equipment and is depreciated over the asset'<span class=\"_ _e\"></span>s entire useful life.  Factor<span class=\"_ _2\"></span>s having a significant influence on the amount of provisions include: <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">cost est<span class=\"_ _2\"></span>imates <span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the t<span class=\"_ _2\"></span>iming of expenditure ; and  </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the d<span class=\"_ _2\"></span>iscount rate applied to cash flows. </span></span>These factor<span class=\"_ _2\"></span>s are based on information and estimates de<span class=\"_ _e\"></span>emed b<span class=\"_ _2\"></span>y the g<span class=\"_ _e\"></span>roup to be the most appropriate as of today. If the e<span class=\"_ _2\"></span>ffect of the time value of money is material, provisions are discounted using a current pre-tax rate that reflec<span class=\"_ _e\"></span>ts, when appropriate, the risks specific to the liability. <span class=\"_ _2\"></span>When discounting is used, the increase in the provision due to the passage of time is re<span class=\"_ _e\"></span>cognised as a finance co<span class=\"_ _2\"></span>st.  <span class=\"_ _e\"></span> 3.3.14 <span class=\"_ _1dd\"> </span>Trade and other payables Trade and<span class=\"_ _2\"></span> other payables are stated at amortised cost.<span class=\"_ _e\"></span> Levies<span class=\"fc1b\"> </span>In its role<span class=\"_ _2\"></span> as a TSO, Elia Transmission Belgium SA/NV an<span class=\"_ _e\"></span>d 50Hertz Transmission<span class=\"_ _2\"></span> GmbH are<span class=\"_ _e\"></span> subject to various public service obligation<span class=\"_ _2\"></span>s imposed by the Government and/or by regulation<span class=\"_ _e\"></span> mechanisms. These identify public service obligations in various fields (such as promoting the u<span class=\"_ _2\"></span>se of renewable energy, social s<span class=\"_ _e\"></span>upport, fees for the use of the <span class=\"ls5b\">pu</span>blic domain, offshore liab<span class=\"_ _e\"></span>ility) for fulfilment by TSOs. The<span class=\"_ _2\"></span> costs incurred by TSOs in accordance with th<span class=\"_ _e\"></span>ese obligations are fully co<span class=\"_ _2\"></span>vered by the tariff <span class=\"_ _e\"></span><span class=\"ff42\">\u2018</span>levies<span class=\"ff42\">\u2019</span> approved by the regulator. The amoun<span class=\"_ _2\"></span>ts outstanding (surplus) are reported as a tr<span class=\"_ _e\"></span>ade and other payable.  In this process<span class=\"ls1d\">, </span>as <span class=\"ff42\">the TSO\u2019s </span>are <span class=\"ls5b\">agent</span>s<span class=\"_ _e\"></span>, the group opted for a net presentation both at profit or loss and at ba<span class=\"_ _2\"></span>lanc<span class=\"_ _e\"></span>e sheet level.  These transact<span class=\"_ _2\"></span>ions are fully \u201cpassed through\u201d.<span class=\"ff3f\"> </span>See also Note<span class=\"_ _2\"></span> 9.1.14.<span class=\"_ _e\"></span><span class=\"fs11\"> </span>3.3.15 <span class=\"_ _1dd\"> </span>Other non-current liabilities  Govern<span class=\"_ _e\"></span>ment grants  Government gran<span class=\"_ _2\"></span>ts are recognised when it is reasonably <span class=\"_ _e\"></span>certain that the group will receive such grants and that all underlying conditions will b<span class=\"_ _2\"></span>e met. Grants related to an asset are pres<span class=\"_ _e\"></span>ented under other liabilities and will be recognised in the <span class=\"_ _e\"></span>statement of profit or loss on a systematic <span class=\"_ _2\"></span>basis over the expected useful life of the asset in question. Grants related to expense items ar<span class=\"_ _e\"></span>e recognised in<span class=\"_ _2\"></span> the statement of <span class=\"_ _2\"></span>profit or loss in the same period as the expe<span class=\"_ _e\"></span>nses for which the<span class=\"_ _2\"></span> grant was received. Government grants are presented as other operating in<span class=\"_ _2\"></span>come in the statement of profit or loss. Contract liabilities <span class=\"_ _e\"></span><span class=\"ff43\">\u2013</span> last mile connection The consider<span class=\"_ _2\"></span>ation of the last mile connection is paid upfro<span class=\"_ _e\"></span>nt, whilst the<span class=\"_ _2\"></span> rev<span class=\"_ _e\"></span>enues are recognised over the lifetime of <span class=\"_ _e\"></span>the underlying asset. The amounts to be relea<span class=\"_ _2\"></span>sed in future are reflected <span class=\"_ _e\"></span>in this section<span class=\"_ _2\"></span>. See also No<span class=\"_ _e\"></span>te 3.4.1.<span class=\"fs11\"> </span>3.3.16 <span class=\"_ _1dd\"> </span>Leases Upon the<span class=\"_ _2\"></span> inception of a contract, the gr<span class=\"_ _e\"></span>oup assesses whether a<span class=\"_ _2\"></span> contract is, or contains, a lease. A contract is, or contains, a lease if the contract<span class=\"_ _2\"></span> conveys the right to control the use of an identified asset for a period of time in exchange for consideration. To assess<span class=\"_ _e\"></span> whether a contract con<span class=\"_ _2\"></span>veys the right to control the use of an identi<span class=\"_ _e\"></span>fied asset, the group uses the definition of a lease included in IFRS 16. The group as a lessee The group<span class=\"_ _2\"></span> recognises a right<span class=\"_ _e\"></span>-<span class=\"ls5b\">of</span>-use asset and a lease liability <span class=\"ls5b\">on </span>the lease commencement date. Assets and liabilities arising from a lease are initially m<span class=\"_ _2\"></span>easured on a present value basis<span class=\"_ _e\"></span> <span class=\"ls5b\">and</span> discounted using the group's best estimate for the weighted average incremental borro<span class=\"_ _2\"></span>wing rate, in case the rate implicit in the <span class=\"_ _e\"></span>lease cannot be readily determined<span class=\"ls1d\">. </span>The group applies a <span class=\"_ _e\"></span>single discount rate per group of similar<span class=\"_ _2\"></span> contracts, su<span class=\"_ _e\"></span>mmarised per the<span class=\"_ _2\"></span>ir durat<span class=\"_ _e\"></span>ion.  Lease payments included in the measuremen<span class=\"_ _2\"></span>t of the lease<span class=\"_ _e\"></span> liability comprise fixed payments, including in-substance fixed payments. Variable lea<span class=\"_ _2\"></span>se payments are expensed as incurred. As <span class=\"ls5b\">a <span class=\"_ _e\"></span></span>practical expedient, no distinction is made between lease and non<span class=\"_ _e\"></span>-lease components.<span class=\"fs11\"> </span>Comp<span class=\"_ _2\"></span>onents that do not transfer any goods <span class=\"_ _e\"></span>or services (initial direct costs, prepayments) are excluded from the lease price. Right of use assets are subsequently reduced by a<span class=\"_ _2\"></span>ccumul<span class=\"_ _e\"></span>ated depre<span class=\"_ _2\"></span>ciation, impairment losses and any adjustment<span class=\"_ _e\"></span>s resulting<span class=\"_ _2\"></span> from the remea<span class=\"_ _2\"></span>surement of the lease liability. <span class=\"_ _e\"></span>These assets are depreciated using the straight-line method from the commencement date to the end of <span class=\"_ _2\"></span>the lease term, unless the lease transfers ownership <span class=\"_ _e\"></span>of the underlying asset to the group by the end of the lease term or the cost of the right-<span class=\"ls5b\">of</span>-use asset reflects the fact that the group will exercise a purchase option. In that case the right-<span class=\"ls5b\">of</span>-use asset will b<span class=\"ls5b\">e </span>depre<span class=\"_ _2\"></span>ciated over the useful life of the underlying asset, which is determined on the same basis as that of property <span class=\"_ _e\"></span>and equipment. The lea<span class=\"_ _2\"></span>se liability is subsequently increased by the interest cost on the lease liability and reduced by lease payment<span class=\"_ _e\"></span>s made. It is remea<span class=\"_ _2\"></span>sured when there is a change in future lease payments arising from a change in an index or rate, a change in the e<span class=\"_ _2\"></span>stimat<span class=\"_ _e\"></span>e of the amoun<span class=\"_ _2\"></span>t expected to be payable under a residual value guarantee, or a change in the reassessment of whether a purc<span class=\"_ _e\"></span>hase or extension option is reasonably certain t<span class=\"_ _2\"></span>o be exercised or a termination option not to be exercised.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> presents right-<span class=\"ls5b\">of<span class=\"_ _e\"></span></span>-<span class=\"ff42\">use assets within \u2018property, plant and equ<span class=\"_ _2\"></span>ipment\u2019 and lease liabilities within \u2018loans and borrowings\u2019 (current </span>and non-curren<span class=\"_ _2\"></span>t) in the statement of financial position.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> has elected not to recognise right-<span class=\"ls5b\">of<span class=\"_ _e\"></span></span>-use assets and lease liabilities for leases of low-value assets and s<span class=\"_ _e\"></span>hort-term leases, including IT eq<span class=\"_ _2\"></span>uipment. The group recognises the lease payments associated with these leases as an expense on a straight-line basis over the lease<span class=\"_ _2\"></span> term. The group as a lessorLeases that sub<span class=\"_ _2\"></span>stantially transfer all the risks and rewards incidental to ownership of an underlying asset are recognised as<span class=\"_ _e\"></span> finance leases. All other lea<span class=\"_ _2\"></span>ses that do not transfer all such <span class=\"_ _e\"></span>risks and rewards are recognised as operating leases. As a lessor, the <span class=\"_ _e\"></span>group has only opera<span class=\"_ _2\"></span>ting lease contracts. The lease payments received <span class=\"_ _e\"></span>are recognised as other income on a straight-line basis over the lease term.<span class=\"fs11\"> </span>3.3.17 <span class=\"_ _24f\"> </span>Regulatory deferral accounts The group<span class=\"_ _2\"></span> operates in a regulated environment in which tariffs are meant to realise total revenue/income consisting of:<span class=\"_ _20\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">a re<span class=\"_ _2\"></span>asonable return on invested capital; </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">all rea<span class=\"_ _2\"></span>sonable costs which are incurred by the group.<span class=\"_ _e\"></span> </span></span>Since the tariffs are ba<span class=\"_ _2\"></span>sed on estimates, there is always a difference between the tariffs that are actually charged and the t<span class=\"_ _e\"></span>ariffs that should ha<span class=\"_ _2\"></span>ve been charged (tariff setting agreed with regul<span class=\"_ _e\"></span>ator) to cover all reasonable costs of the system operator including <span class=\"ls5b\">a </span>reasonable profit marg<span class=\"_ _2\"></span>in for its shareholders.<span class=\"_ _e\"></span> If the applied tariffs <span class=\"_ _2\"></span>result in a surplus or a deficit at the end of the year, this means that the tariffs charged to <span class=\"_ _e\"></span>end consumers should have been lower or<span class=\"_ _2\"></span> higher respectively (<span class=\"_ _e\"></span>and vice versa). This surplus or deficit is therefore reported in the regulatory deferral account.  The release<span class=\"_ _2\"></span> of the regulatory deferral account will impact future tariffs: i<span class=\"_ _e\"></span>ncurred regulatory liabilities will de<span class=\"_ _2\"></span>crease fu<span class=\"_ _e\"></span>ture tariffs, whilst incurred regulato<span class=\"_ _2\"></span>ry assets will increase future tariffs.<span class=\"_ _e\"></span> In the absence of an IF<span class=\"_ _2\"></span>RS standard which specifically applyies<span class=\"_ _e\"></span> to the treatment <span class=\"ls5b\">of</span> these regulatory deferral accounts, Elia manageme<span class=\"_ _e\"></span>nt referred to the<span class=\"_ _2\"></span> requirements of IFRS 14 and the Conceptual Framework for Financial Reporting al<span class=\"_ _e\"></span>ongside the lates<span class=\"_ _e\"></span>t change<span class=\"_ _2\"></span>s in the IASB project on Ra<span class=\"_ _2\"></span>te-regulated Activities to develop the following accounting policy: <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">a liability is re<span class=\"_ _2\"></span>cognised in the statement of financial position and presented as part of <span class=\"_ _e\"></span><span class=\"ff42\">\u201caccruals and deferred income\u201d</span> with respect </span></span>to the Elia g<span class=\"ff42\">roup\u2019s obligation</span> to deduct an amount from the tariffs <span class=\"_ _2\"></span>to be charged to customers in future periods because the total allowed compensa<span class=\"_ _2\"></span>tion for goods or services already supplied is lower than the amount already charged to customers<span class=\"_ _e\"></span>, or excess revenues has been<span class=\"_ _2\"></span> generated due to higher v<span class=\"_ _e\"></span>olumes than initially estimated (regulatory liability);  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">an a<span class=\"_ _2\"></span>sset is recognised in the statement of financial position w<span class=\"_ _e\"></span>ith respect to the Elia g<span class=\"ff42\">roup\u2019s</span> right to add an amount to the tariffs to </span></span>be charged to customer<span class=\"_ _2\"></span>s in future periods because the total allowed compensation for the goods or services already supplied exceeds the amount already cha<span class=\"_ _2\"></span>rged to customers <span class=\"_ _e\"></span>or shortage in revenues has occurred due to lower volumes than initially estimated (regulatory asse<span class=\"_ _2\"></span>t); and<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the n<span class=\"_ _2\"></span>et movement in the regulatory deferral accounts for the period is presented separately in the statement of profit or loss within<span class=\"_ _e\"></span> </span></span>the line item <span class=\"ff42\">\u201cnet regulatory income (e<span class=\"_ _2\"></span>xpense)\u201d.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>The amoun<span class=\"_ _2\"></span>t in the regulatory deferral accounts is rep<span class=\"_ _e\"></span>orted on an annual basis and assessed by the regulator. The <span class=\"_ _1\"></span>s<span class=\"_ _e\"></span>um <span class=\"_ _4b\"></span>of <span class=\"_ _2\"></span>revenue <span class=\"_ _1\"></span>f<span class=\"_ _e\"></span>rom <span class=\"_ _4b\"></span>contracts <span class=\"_ _4b\"></span>with <span class=\"_ _4b\"></span>cus<span class=\"_ _e\"></span>tomers <span class=\"_ _4b\"></span>(<span class=\"_ _e\"></span>as <span class=\"_ _1\"></span>d<span class=\"_ _e\"></span>efi<span class=\"_ _e\"></span>ned <span class=\"_ _1\"></span>in<span class=\"_ _e\"></span> <span class=\"_ _4b\"></span>IFRS <span class=\"_ _2\"></span>15), <span class=\"_ _4b\"></span>other <span class=\"_ _4b\"></span>income <span class=\"_ _4b\"></span>an<span class=\"_ _e\"></span>d <span class=\"_ _4b\"></span>the <span class=\"_ _4b\"></span>n<span class=\"_ _e\"></span>et <span class=\"_ _4b\"></span>income <span class=\"_ _4b\"></span>(expens<span class=\"_ _e\"></span>e) <span class=\"_ _4b\"></span>from <span class=\"_ _2\"></span>the <span class=\"_ _4b\"></span>settlement mechan<span class=\"_ _2\"></span>ism <span class=\"_ _e\"></span>is <span class=\"_ _e\"></span>also p<span class=\"_ _e\"></span>resented as <span class=\"_ _e\"></span>a subt<span class=\"_ _e\"></span>otal he<span class=\"_ _e\"></span>aded <span class=\"_ _e\"></span><span class=\"ff42\">\u201c</span>Revenue, other i<span class=\"_ _e\"></span>ncome <span class=\"_ _e\"></span>and <span class=\"_ _e\"></span>net inco<span class=\"_ _e\"></span>me (expense) <span class=\"_ _e\"></span>from settl<span class=\"_ _e\"></span>ement m<span class=\"_ _e\"></span>echanism<span class=\"ff42\">\u201d</span><span class=\"ls1d\">, <span class=\"_ _e\"></span></span>as in <span class=\"_ _20\"></span>substance <span class=\"_ _e\"></span>it<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>represents <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>rev<span class=\"_ _e\"></span>enue <span class=\"_ _20\"></span>that <span class=\"_ _20\"></span>is <span class=\"_ _e\"></span>ec<span class=\"_ _e\"></span>onomically <span class=\"_ _20\"></span>earned <span class=\"_ _20\"></span>during <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>pe<span class=\"_ _e\"></span>riod <span class=\"_ _20\"></span>taking <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>nto <span class=\"_ _20\"></span>account <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>regulated<span class=\"_ _20\"></span> <span class=\"_ _20\"></span>environment <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>n which the Elia group operates<span class=\"ls1d\">. </span>The effect of discounting is reflected in the financia<span class=\"_ _2\"></span>l result. <span class=\"_ _e\"></span>See Note 9.  3.4 <span class=\"_ _24d\"></span>Items in the statement of profit or loss3.4.1 <span class=\"_ _36\"> </span>Inco<span class=\"_ _e\"></span>me Revenu<span class=\"_ _e\"></span>es IFRS 15 est<span class=\"_ _2\"></span>ablishes a five-step model to account for <span class=\"_ _e\"></span>revenue arising from contracts <span class=\"_ _2\"></span>with customers and requires that revenue be recogn<span class=\"_ _2\"></span>ised at an amount that reflects the consideration to which an entity expects to be entitled in exchange for transferring goods or services to a customer. The<span class=\"_ _2\"></span>se are the five steps to consider for each customer contract: 1.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Identifing the contract(s) with a customer; </span></span>2.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Identifing the performance obligations in the contract(s); </span></span>3.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Determining the transaction price; </span></span>4.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Allocating the transaction price to the performance obligations; </span></span>5.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Recognising revenue when performance obligations are satisfied, or when control of goods or services is transferred to the </span></span>customer. The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s main revenues <span class=\"ff3f\">are realised by TSOs which o<span class=\"_ _e\"></span>perate in accordan<span class=\"_ _2\"></span>ce with r<span class=\"_ _e\"></span>egulatory frameworks and which have de </span></span>facto/lega<span class=\"_ _2\"></span>l monopolies in their respective control zones. T<span class=\"_ _e\"></span>he framewor<span class=\"_ _2\"></span>ks w<span class=\"_ _e\"></span>hich apply in the g<span class=\"ff42\">roup\u2019s </span>main countries of activity are detailed in<span class=\"_ _2\"></span> Note 9 <span class=\"ff42\">\u2018</span>Regulatory framework and tariffs<span class=\"ff42\">\u2019<span class=\"ff45\">.<span class=\"_ _e\"></span></span></span> With regard to the regulated bu<span class=\"_ _2\"></span>siness, each service is based on a standard contract with the customer, mostly with<span class=\"_ _e\"></span> a predefined regulated tariff (<span class=\"_ _2\"></span>unit price multiplied by th<span class=\"_ _e\"></span>e volume (injection or<span class=\"_ _2\"></span> offtake) or the reserved capacity (depending on the type of service)<span class=\"_ _e\"></span>), so pricing is not var<span class=\"_ _2\"></span>iable. The allocation of the transaction pri<span class=\"_ _e\"></span>ce over the different performance obligations is therefore <span class=\"_ _e\"></span>straightforward (one-to<span class=\"ls0\">-one relationship). Most of these con<span class=\"_ _2\"></span>tracts <span class=\"_ _e\"></span>are concluded for an indefinite period and have general payment terms of <span class=\"ls5b\">15</span>-30 days.<span class=\"_ _e\"></span> </span>Considerin<span class=\"_ _2\"></span>g the business of the Elia <span class=\"_ _e\"></span>group, there are no relevant right-<span class=\"ls78\">of<span class=\"_ _2\"></span><span class=\"ls0\">-return and warranty obligations. </span></span>For a<span class=\"_ _2\"></span>ll services provided by the group, Elia is the sole an<span class=\"_ _e\"></span>d primary party responsible for executing the service and is thus the principal. <span class=\"_ _e\"></span> However, in<span class=\"_ _2\"></span> its role as a TSO, Elia <span class=\"_ _e\"></span>Transmission Belgium SA/NV and 50Hertz Transmission GmbH are subject to public service obligation<span class=\"_ _2\"></span>s imposed by the government/regulation mechanisms. These oblig<span class=\"_ _e\"></span>ations mainly relate to financial support for the development of renewable ener<span class=\"_ _2\"></span>gy. TSOs act as agents for these activities, and since the expense/income streams are fully covered by tariffs, t<span class=\"_ _e\"></span>hey have no<span class=\"_ _2\"></span> impact on the statement of profit and loss. See section <span class=\"ff42\">\u2018</span>Levies<span class=\"ff42\">\u2019</span> of Note 3.3.14 for more information on the accounting treatment. The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s main performance obligations/contract types, their pricing and the rev<span class=\"ff3f\">e<span class=\"_ _e\"></span>nue recognition method for 2022 can be summarised </span></span>as follows: Revenue <span class=\"_ _e\"></span>by category for Elia Tran<span class=\"_ _2\"></span>smission Belgium Revenue stream Nature, customer and timing of satisfaction of performance o<span class=\"_ _2\"></span>bligations<span class=\"_ _e\"></span> Contract <span class=\"ff43\">\u2013</span> Price setting Grid revenues Technical studies<span class=\"ff3f\"> conducted at the request of grid users, connected directly to the </span>Contract and tariff approved by grid with a view to having a new connection built or an existing connection alt<span class=\"_ _2\"></span>ered. <span class=\"_ _20\"></span> regulator. The revenue is recognised at the point in time when the study is delivered. Fixed amount per type of study. Last-<span class=\"_ _e\"></span>mile conn<span class=\"_ _2\"></span>ection <span class=\"ff3f\">is a component of the grid connection contract. At the requ<span class=\"_ _2\"></span>est </span>Standard contract approved by of a future grid user, Elia constructs/adjusts a dedicated/ physical <span class=\"_ _2\"></span>connection, known regulator, but the price is set on as a last-mile connection, to connect the customer<span class=\"ff42\">\u2019s fac<span class=\"_ _e\"></span>ility to Eli<span class=\"_ _2\"></span>a\u2019s grid. Although </span>the basis of the budget for control of the asset is not transferred as such to the grid user, the <span class=\"_ _2\"></span>grid user obtains imple<span class=\"_ _e\"></span>menting the c<span class=\"_ _2\"></span>onnection. direct access to the high-vol<span class=\"_ _e\"></span>tage grid. The a<span class=\"_ _2\"></span>ccess right transferred by Elia is valuable to the grid user, hence why the grid user compensates Elia in cash. <span class=\"ff40\"> </span>Since the grid user simultaneously enters into a grid connectio<span class=\"_ _2\"></span>n contract, the t<span class=\"_ _e\"></span>w<span class=\"_ _2\"></span>o Grid connection activities (access right and grid connection services) are not distin<span class=\"_ _2\"></span>ct and constitute a single performance obli<span class=\"_ _e\"></span>gation and int<span class=\"_ _2\"></span>erdependence between the contracts. As the total amount of revenue recognised for this single performa<span class=\"_ _2\"></span>nce obligation, which includes grid connection services, is recognised over the life of the assets, the contract has no specific end date.  This component of the grid connection/grid user contract is presented separately  <span class=\"_ _2\"></span> (not part of the grid connection/revenues from the revenue cap) because the tariff<span class=\"_ _e\"></span>-setting method is very specific from a regulatory perspective. The fees charged to grid users/distribution sys<span class=\"_ _e\"></span>tem operators (DSO<span class=\"_ _2\"></span>s) cover the Contract and tariff approved by maintenance and operating<span class=\"ff3f\"> costs relating to the</span> de<span class=\"_ _e\"></span>dicated con<span class=\"_ _2\"></span>nection facilities. regulator. The revenue is recognised over time, as this service is performed continuously Tariff is set per asset type (e.g. throughout the contractual term. bay, km of cable). This component of the access contract signed with access holders/DSOs covers the Contract and tariff approved by development and management of the grid with a view to meeting capacity needs and regulator. Management and satisfying demand for electricity transmission.  EUR per kW/KVA for development of grid The revenue is recognised over time, as providing sufficient capacity and a resilient yearly/monthly peak and power infrastructure grid is a service performed continuously throughout the contractual term. available at access point. This component of the access contract signed with access holders/DSOs covers the Contract and tariff approved by mana<span class=\"_ _e\"></span>g<span class=\"_ _2\"></span>ement and operation of the electricity system and the offtak<span class=\"_ _2\"></span>e of additional regulator. Management of the reactive energy relat<span class=\"ls9d\">in<span class=\"_ _e\"></span></span>g <span class=\"ff42\">to Elia<span class=\"_ _e\"></span>\u2019s grid (different from the <span class=\"_ _2\"></span>connection assets).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>EUR per kW/ kVArh at access electricity system<span class=\"ff3f\"> </span>The revenue is recognised over time, as these services are performed continuously point.  throughout the contractual term. This component is part of the access contract signed with access <span class=\"_ _2\"></span>holders/DSOs, and Contract and tariff approved by covers (i) services to facilitate the energy market; (ii) services to <span class=\"_ _2\"></span>develop and regulator. enhance the integration of an effective and efficient electricity market;<span class=\"_ _e\"></span> (iii) the EUR per kW at access point. mana<span class=\"_ _e\"></span>g<span class=\"_ _2\"></span>ement of interconnectors and coordination with neighbouring countries and the European authorities; and (iv) the publication of data, as requir<span class=\"_ _2\"></span>ed by transparency Market integration obligations. The revenue is recognised over time,<span class=\"_ _e\"></span> as these services are <span class=\"_ _2\"></span>performed continuously throughout the contractual term. As defined in the BRP contract, the BRP<span class=\"_ _2\"></span> (Balance <span class=\"_ _e\"></span>Responsible Party) has a Contract and tariff/mechanism commitment to ensure a perfect balance between offtake and injection on the grid. In approved by regulator. Compensation for the event of an imbalance caused by a BRP, Elia has to activate the ancillary Based on market prices, EUR per imbalances services, <span class=\"_ _e\"></span>which are then invoiced t<span class=\"_ _2\"></span>o the <span class=\"_ _e\"></span>BRP. kW imbalance at access point. The revenue is recognised at the point in time when an imbalance<span class=\"_ _2\"></span> occurs.<span class=\"_ _e\"></span> Grid use along borders is organised through half<span class=\"_ _e\"></span>-yearly, quarterly,<span class=\"_ _2\"></span> monthly, weekly, Framework agreement with parties weekend, daily and intra-day auctions. Elia and the regulators decide which auctions and auction office. are conducted alon<span class=\"_ _e\"></span>g each border. Aucti<span class=\"_ _2\"></span>ons are organised through an auction office, Price is set based on price International revenues which acts as an agent. The auction office collects the revenues <span class=\"_ _2\"></span>paid by the difference in cross-border <span class=\"_ _e\"></span>mar<span class=\"_ _2\"></span>ket European energy traders, which are ultimately<span class=\"_ _e\"></span> shared between ne<span class=\"_ _2\"></span>ighbouring TSOs prices.  based on the volumes imported/exported on the border. The revenue is recognised at the point in time when an <span class=\"_ _e\"></span>import/exp<span class=\"_ _2\"></span>ort activity occurs. Revenue <span class=\"_ _e\"></span>by categor<span class=\"_ _2\"></span>y for 50 Hertz Transmission  Revenue stream Nature and timing of satisfaction of performance obligations Contract <span class=\"ff43\">\u2013</span> Price setting Grid revenues The \u2018grid use fee\u2019 is charged to grid users/DSOs connected to the <span class=\"_ _2\"></span>grid for the Standard contract and grid tariffs volume of injection and/or offtake on the onshore grid. This contract is signed with defined by regulator. grid users.  The revenue is recognised over time, as this service is a performed continuousl<span class=\"ls83\">y </span>throughout the contractual term. Revenues from incentive Last-<span class=\"_ _e\"></span>mile conn<span class=\"_ _2\"></span>ection <span class=\"ff42\">is a component of the \u2018grid use fee\u2019 contract. At the request </span>Standard contract approved by regulation<span class=\"ff3f\"> </span>of a future grid user, 50Hertz constructs a dedicated/physical connection, known as regulator, but the price is set on a last-mile connection, to create an interface point to the grid. Although control of the basis of the budget for the asset is not transferred as such to the grid user, the grid user obtains dire<span class=\"_ _2\"></span>ct imple<span class=\"_ _e\"></span>menting the c<span class=\"_ _2\"></span>onnection. access to the high-vo<span class=\"_ _e\"></span>ltage grid. Th<span class=\"_ _2\"></span>e access right<span class=\"_ _e\"></span> transferred by 50Hertz is valuable to the grid user, hence why the grid user compensates Elia in cash. <span class=\"ff40\"> </span>Since the grid user simultaneously enters into a grid connectio<span class=\"_ _2\"></span>n contract, the t<span class=\"_ _e\"></span>w<span class=\"_ _2\"></span>o activities (access right and grid connection services) are not d<span class=\"_ _e\"></span>istin<span class=\"_ _2\"></span>ct and constitute a single performance obligation and interdependence between the contr<span class=\"_ _2\"></span>acts.<span class=\"_ _e\"></span> As the total amount of revenue recognised for this single performa<span class=\"_ _2\"></span>nce obligation, which includes grid connection services, is recognised over the life of the <span class=\"_ _e\"></span>assets, the contract has no specific end date.  This component of the grid connection/grid user contract is presented separately (not part of the grid connection/revenues from the revenue cap) because the tariff<span class=\"_ _e\"></span>-setting method is very specific from a regula<span class=\"_ _e\"></span>tory perspective. This component comprises tariffs charged to grid users/DSOs to c<span class=\"_ _2\"></span>over grid Contract and tariffs predefined in Revenues from offshore connection costs for offshore wind farms.  regulatory mechanism. regulation The revenue is recognised over time, as this service is performed continuously throughout the contractual term  This revenue stream consists of different components  Cong<span class=\"_ _2\"></span>esti<span class=\"_ _e\"></span>on management and redispatch <span class=\"ff3f\">fees are paid by market participants for </span>Standard contracts approved by use of the capacity made available by 50Hertz on specific lines (i<span class=\"_ _2\"></span>ncluding use of regulator and tariff mechanism cross-border assets). This allocation mechanism is governed by tr<span class=\"_ _2\"></span>ansparent, defined in regulatory schemes.  market-or<span class=\"_ _e\"></span>iented pr<span class=\"_ _2\"></span>ocedures.  The revenue is recognised at the point in ti<span class=\"_ _e\"></span>me when it is g<span class=\"_ _2\"></span>enerated<span class=\"ff40\"> </span>Compensation for imbalances<span class=\"_ _e\"></span><span class=\"ff3f\">  </span>Market participants (BRPs) have a commitment to ensure a perfect balance Standard contracts approved by Energy revenues between offtake and injection on the grid. In the event of an imbalance, 50Hertz regulator and tariff mechanism invoices the market participant to compensa<span class=\"_ _e\"></span>te for the cost<span class=\"_ _2\"></span>s incurred. defined in regulatory schemes.  The revenue is recognised at the point in time when an <span class=\"_ _e\"></span>imbalance<span class=\"_ _2\"></span> occurs. Horizontal reimbursement of lignite back-up costs In its role as a TSO, 50Hertz charges fees to other TSOs for servi<span class=\"_ _2\"></span>ces related to the  reserve power re<span class=\"_ _e\"></span>quired by t<span class=\"_ _2\"></span>he legal framework. The revenue is recognised over time, as this service is performed continuously throughout the contractual term. Other rev<span class=\"_ _e\"></span>enues Revenue stream Nature and timing of satisfaction of performance obligations Contract <span class=\"ff43\">\u2013</span> Price setting Other revenues Elia Grid International provides consultancy services to third parties around the Contract negotiated between E<span class=\"ls102\">GI</span> world.  and customer. The revenue is recognised over the comp<span class=\"_ _e\"></span>letion of the contract.  The contract price is set when the Third-party services contract is concluded with the Third-party services are presented in other revenues. customer. The payment term is generally 30 days from the invoice date. Re.alto provides a platform throu<span class=\"_ _e\"></span>gh which energy actors (e.g. tra<span class=\"_ _2\"></span>ders, prosumers) The commission fee is a fixed can exchange energy data. re.alto receives a commission on transactions percentage on each transaction. undertaken via the platform. Commission fee The revenue is recognised at the point in t<span class=\"_ _e\"></span>ime when t<span class=\"_ _2\"></span>he transaction occurs. The commission fee is presented in other revenues. This mainly covers other services than those described above.  Others<span class=\"ff3f\"> </span>The revenue is recognised at the point in time when the service is complete. Consequently, all revenue com<span class=\"_ _2\"></span>ponents contain revenue from contracts with customers, i.e. parties that have contract<span class=\"_ _20\"></span>s in p<span class=\"_ _2\"></span>lace with the Group <span class=\"_ _2\"></span>to obtain services resulting from the Group<span class=\"ff42\">\u2019s o<span class=\"_ _e\"></span>rdinary activities in exchange for </span><span class=\"ls5b\">a </span>consideration. Other in<span class=\"_ _e\"></span>come  Other in<span class=\"_ _2\"></span>come is recognised when the related service is p<span class=\"_ _e\"></span>erformed and no further performance obligations arise<span class=\"fc1d\">. </span>Net r<span class=\"_ _e\"></span>egulatory<span class=\"_ _2\"></span> income (expense) from <span class=\"_ _e\"></span>settleme<span class=\"_ _2\"></span>nt mech<span class=\"_ _e\"></span>anism Since the tariffs are based on estimates, there is a<span class=\"_ _2\"></span>lways a<span class=\"_ _e\"></span> difference be<span class=\"_ _2\"></span>tween the tariffs that are actually charged and the tariffs that should ha<span class=\"_ _2\"></span>ve been charged (tariff setting is ag<span class=\"_ _e\"></span>reed with the <span class=\"ff42\">regulator) to cover all the system operator\u2019s reasonab<span class=\"_ _2\"></span>le <span class=\"_ _e\"></span>costs, <span class=\"ff3f\">including a </span></span>reasonable profit marg<span class=\"_ _2\"></span>in for the shareholders.<span class=\"_ _e\"></span> If the applied tariffs <span class=\"_ _2\"></span>result in a surplus or deficit at the end of the year, this means that the tariffs charged to consumer<span class=\"_ _e\"></span>s/the general public could<span class=\"_ _2\"></span> have been lower or higher. This surplus or de<span class=\"_ _e\"></span>ficit is therefore reported in the settlement mechanism deferra<span class=\"_ _2\"></span>l account. <span class=\"_ _20\"></span> The release<span class=\"_ _2\"></span> of this deferral account will impact future tariffs: where regulatory liabilities are incurred, future tariffs wi<span class=\"_ _e\"></span>ll be lower, and where regula<span class=\"_ _2\"></span>tory assets are incurred, future ta<span class=\"_ _e\"></span>riffs will be higher. The<span class=\"_ _2\"></span> net movement in the regulatory deferral accounts for the period is presen<span class=\"_ _2\"></span>ted separately in the statement of profit or loss <span class=\"ls1c\">in</span> the line 'Net income (expense) from settlement mechanism'. See also Note 3.3.17. <span class=\"fs11\"> </span>3.4.2 <span class=\"_ _36\"> </span>Expenses Other <span class=\"_ _e\"></span>expenses Property taxes are d<span class=\"_ _2\"></span>irectly recognised in full as soon as o<span class=\"_ _e\"></span>wnership is certain (generally on 1 January of the year in question). However, these cost<span class=\"_ _2\"></span>s, which are considered to be <span class=\"ls5b\">non<span class=\"_ _e\"></span></span>-controllable costs under the regulatory framework, are recorded as revenue through the settlement me<span class=\"_ _2\"></span>chanism for the same amount, resulting in zero imp<span class=\"_ _e\"></span>act in terms of profit or loss. Finance income and expensesFinance<span class=\"_ _2\"></span> expenses comprise interest payable on <span class=\"_ _e\"></span>borrowings (calculated using the effective interest rate method)<span class=\"ls1d\">, </span>in<span class=\"_ _e\"></span>terest on lease liabilities, fore<span class=\"_ _2\"></span>ign-exchange losses, gains on currency hed<span class=\"_ _e\"></span>ging instruments that offset currency losses, results on interest-rate hedging instruments, losse<span class=\"_ _2\"></span>s on hedging instruments that are not part of a hedge accounting relationship, losses on financial assets classified as being for trading purposes and imp<span class=\"_ _2\"></span>airment losses on financial assets as well as any losses from hedge ineffectiveness. <span class=\"_ _e\"></span> Finance<span class=\"_ _2\"></span> income includes interest receivables on bank deposits, which a<span class=\"_ _e\"></span>re recognised in profit or loss using the effective interest rate method as the<span class=\"_ _2\"></span>y accrue.<span class=\"_ _e\"></span> Borrowing c<span class=\"_ _2\"></span>osts that are not directly attributable to the acquisition, construction or production of a qualifying asset <span class=\"_ _e\"></span>are re<span class=\"_ _2\"></span>cognised in profit or loss using the<span class=\"_ _2\"></span> effective interest method.<span class=\"_ _e\"></span> Inco<span class=\"_ _e\"></span>me taxes<span class=\"_ _2\"></span> Income taxes comprise<span class=\"_ _2\"></span> current and deferred tax. Income <span class=\"_ _e\"></span>tax expense is recognised in profit or loss, except where it relates to items recogn<span class=\"_ _2\"></span>ised directly in equity. Taxes on hybrid coupons are recognised in the statement of profit and loss as these <span class=\"_ _e\"></span>are a tax on profits whereas <span class=\"_ _2\"></span>the hybrid coupon itself is recognised directly i<span class=\"_ _e\"></span>n equity. Curren<span class=\"_ _2\"></span>t tax is the expected tax payable on taxable income for the year, using tax rates enacted or substantively enacted at the end of the reporting period, and a<span class=\"_ _2\"></span>ny adjustments to tax payable in relation to previous years. Deferred tax <span class=\"_ _2\"></span>is recognised, using the balance she<span class=\"_ _e\"></span>et method, on temporary differences arising between the carrying<span class=\"_ _e\"></span> amounts of assets and liabilities for fin<span class=\"_ _2\"></span>ancial reporting purposes and the amounts used for taxation purposes. Deferred tax is not recognised for<span class=\"_ _e\"></span> the following tempor<span class=\"_ _2\"></span>ary differences: the initial recognition of assets or liabilities in a transaction that is not a business c<span class=\"_ _e\"></span>ombination and that affects ne<span class=\"_ _2\"></span>ither accounting nor taxable profit<span class=\"ls1d\">; </span>a<span class=\"_ _e\"></span>nd differences relating to investments in sub<span class=\"_ _2\"></span>sidiaries and joint ventur<span class=\"_ _e\"></span>es where these will probably <span class=\"ls5b\">not</span> <span class=\"ls5b\">be</span> reversed in the foreseeable future. In addition, deferred tax is not recognised for taxable temporary differences arising from initia<span class=\"_ _2\"></span>l recognition of goodwill. Deferred tax is measured at the tax rates that are expected to be applied to the tempor<span class=\"_ _e\"></span>ary differences when the<span class=\"_ _2\"></span>y are reversed, based on the laws that have been enacted or substantively enacted by the reporting date. Deferred tax assets and liabilities are o<span class=\"_ _2\"></span>ffset if there is a legally enforceable right to offset current tax liabilities and assets and the <span class=\"_ _e\"></span>deferred items relate to income ta<span class=\"_ _2\"></span>xes levied by the same tax authority on the same taxable entity or on different tax entities, but they a<span class=\"_ _e\"></span>re intend<span class=\"ls5b\">ed</span> to settle curren<span class=\"_ _2\"></span>t tax liabilities and assets on a net basis, or th<span class=\"_ _e\"></span>eir tax assets and liabilities will be<span class=\"_ _2\"></span> realised si<span class=\"_ _e\"></span>multaneously. A deferred ta<span class=\"_ _2\"></span>x asset is recognised only to the extent that it is likely that future taxable profits will be ava<span class=\"_ _2\"></span>ilable agains<span class=\"_ _e\"></span>t<span class=\"_ _e\"></span> which the asset can be utilised. Deferred tax <span class=\"_ _2\"></span>assets are reduced to the extent that it is no longer likely that<span class=\"_ _e\"></span> the related tax benefit will be realised. Additional income ta<span class=\"_ _2\"></span>xes that arise from the distribution of dividends are recognised at the same time as the liability to pay<span class=\"_ _e\"></span> the related dividend. 3.5 <span class=\"_ _235\"> </span>Statement<span class=\"_ _e\"></span> of comprehensive inc<span class=\"_ _2\"></span>ome and statement of changes in equity<span class=\"_ _e\"></span> The statement of <span class=\"_ _2\"></span>comprehensive income presents an overview of all revenues and expenses recognise<span class=\"_ _e\"></span>d in the consolidated statement of pro<span class=\"_ _2\"></span>fit or loss and in the consolidated statement of changes in equity. The gr<span class=\"_ _e\"></span>oup has elected to present comprehensive income using the two-<span class=\"_ _2\"></span>statement approach, i.e. the statement of profit or loss immediately followed by th<span class=\"_ _e\"></span>e statement of other comprehensive income. As a result o<span class=\"_ _2\"></span>f this approach, the content of the statement <span class=\"_ _e\"></span>of changes in equity is r<span class=\"_ _2\"></span>estricted to owner-<span class=\"_ _e\"></span>related changes. 4.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Segment reporting</span>4.1 <span class=\"_ _148\"> </span>Basis for segment reporting The group<span class=\"_ _2\"></span> has opted for segment reporting, in conformity <span class=\"_ _e\"></span>with the different regulatory frameworks that currently exi<span class=\"_ _e\"></span>st within the group. This reporting approach closely reflects the g<span class=\"ff42\">roup\u2019s operational activitie<span class=\"_ _2\"></span>s and<span class=\"ff3f\"> is also in line with the g<span class=\"_ _e\"></span></span>roup\u2019s internal reporting to the </span>Chief Operating De<span class=\"_ _2\"></span>cision Maker (CODM), e<span class=\"_ _e\"></span>nabling the CODM to better evaluate and assess the g<span class=\"ff42\">roup\u2019s performance and a</span>ctivities in a transparent <span class=\"_ _2\"></span>way.<span class=\"_ _e\"></span> Pursuant to IF<span class=\"_ _2\"></span>RS 8, the group has identified the following <span class=\"_ _e\"></span>opera<span class=\"_ _2\"></span>ting segments based on the aforementioned criteria:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Elia Tra<span class=\"_ _2\"></span>nsmission (Belgium), which comprises the activities based undertaken in line with <span class=\"_ _e\"></span>the Belgian regulatory framework:<span class=\"_ _2\"></span> the </span></span>regulated act<span class=\"_ _2\"></span>ivities of Elia Transmission Belgium SA/NV<span class=\"_ _e\"></span>, El<span class=\"_ _e\"></span>ia Asset SA/NV, Elia Engineering SA/NV, Elia Re SA, HGRT SAS and Coreso SA/NV, whose act<span class=\"_ _2\"></span>ivities are directly linked to the role of the Belgian transmission system operator and are<span class=\"_ _e\"></span> subject to the regulatory frame<span class=\"_ _2\"></span>work applicable in Belgium <span class=\"ff42\">\u2013</span> s<span class=\"_ _e\"></span>ee Section 9.1.3. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">50Her<span class=\"_ _2\"></span>tz Transmission (Germany), which comprises the activities undertaken in line with the German regulatory framework: </span></span>Eurogrid GmbH, 50Hertz<span class=\"_ _2\"></span> Transmission GmbH and 50Hertz Offshore GmbH, whos<span class=\"_ _e\"></span>e activities are directly linked to the role of the transmission system<span class=\"_ _2\"></span> operator in Germany <span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span> see Section 9.2.3. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Non-r<span class=\"_ _2\"></span>egulated activities and Nemo Link, comprising<span class=\"ls1d\">: <span class=\"_ _e\"></span></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Elia Group NV/SA, mainly consisting of the holding activities in the Elia Transmission (Belgium) <span class=\"ls5b\">and </span>5<span class=\"_ _e\"></span>0Hertz Transmission </span></span>(Germany) segment<span class=\"ls1d\">; </span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Eurogrid International NV/SA; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">the h<span class=\"_ _e\"></span>olding <span class=\"_ _e\"></span>activities in<span class=\"_ _e\"></span> Nem<span class=\"_ _e\"></span>o Link <span class=\"_ _e\"></span>Lt<span class=\"_ _e\"></span>d. <span class=\"_ _e\"></span>This co<span class=\"_ _e\"></span>mpany co<span class=\"_ _e\"></span>mprises and<span class=\"_ _e\"></span> manages <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>Nemo <span class=\"_ _e\"></span>project, w<span class=\"_ _e\"></span>hich <span class=\"_ _e\"></span>connects <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>UK<span class=\"_ _e\"></span> </span></span>and <span class=\"_ _4b\"></span>Belgium <span class=\"_ _2\"></span>using <span class=\"_ _2\"></span>high-voltage e<span class=\"_ _2\"></span>lectricity <span class=\"_ _4b\"></span>c<span class=\"_ _e\"></span>ables, <span class=\"_ _2\"></span>enab<span class=\"_ _2\"></span>lin<span class=\"_ _e\"></span>g <span class=\"_ _2\"></span>power <span class=\"_ _4b\"></span>to<span class=\"_ _e\"></span> <span class=\"_ _2\"></span>be <span class=\"_ _4b\"></span>excha<span class=\"_ _e\"></span>nged <span class=\"_ _2\"></span>between <span class=\"_ _4b\"></span>the <span class=\"_ _2\"></span>two <span class=\"_ _2\"></span>countries <span class=\"_ _2\"></span>and <span class=\"_ _4b\"></span>f<span class=\"_ _e\"></span>or <span class=\"_ _4b\"></span>which<span class=\"_ _e\"></span> a specific regulatory framework ha<span class=\"_ _2\"></span>s been set up <span class=\"ff42\">\u2013</span> see Se<span class=\"_ _e\"></span>ction 9.3 for more<span class=\"_ _2\"></span> details;<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">the non-regulated activities <span class=\"ls5b\">of</span> t<span class=\"_ _e\"></span>he Elia Transmission (Belgi<span class=\"_ _e\"></span>um) segmen<span class=\"_ _2\"></span>t<span class=\"_ _e\"></span><span class=\"ls1d\">. </span><span class=\"ff42\">\u2019</span>N<span class=\"ls5b\">on</span>-<span class=\"_ _e\"></span>regulated activities<span class=\"ff42 ls1c\">\u2019 </span>refers to activities which<span class=\"_ _e\"></span> </span></span>are not dire<span class=\"_ _2\"></span>ctly related to the role of <span class=\"ls5b\">a <span class=\"_ _e\"></span></span>TSO <span class=\"ff42\">\u2013</span> see Section 9.1;<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">EGI <span class=\"_ _2\"></span>(Elia <span class=\"_ _4b\"></span>Grid <span class=\"_ _2\"></span>Inter<span class=\"_ _2\"></span>national <span class=\"_ _4b\"></span>NV/S<span class=\"_ _e\"></span>A, <span class=\"_ _4b\"></span>E<span class=\"_ _e\"></span>lia <span class=\"_ _4b\"></span>Grid <span class=\"_ _2\"></span>Intern<span class=\"_ _2\"></span>ational <span class=\"_ _4b\"></span>GmbH<span class=\"_ _e\"></span><span class=\"ls1d\">, <span class=\"_ _2\"></span><span class=\"ls0\">Elia <span class=\"_ _4b\"></span>Grid <span class=\"_ _2\"></span>Inte<span class=\"_ _2\"></span>rnational <span class=\"_ _4b\"></span>P<span class=\"_ _e\"></span>te. <span class=\"_ _4b\"></span>Ltd Singa<span class=\"_ _2\"></span>pore <span class=\"_ _4b\"></span>(closed <span class=\"_ _2\"></span>in <span class=\"_ _2\"></span>2022<span class=\"_ _2\"></span>),<span class=\"_ _e\"></span> </span></span></span></span>Elia <span class=\"_ _e\"></span>Grid <span class=\"_ _e\"></span>International <span class=\"_ _20\"></span>LLC <span class=\"_ _e\"></span>Saudi <span class=\"_ _20\"></span>Arabia <span class=\"_ _e\"></span>and<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>Elia <span class=\"_ _20\"></span>Grid<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>International Inc<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>Cana<span class=\"_ _e\"></span>da <span class=\"_ _e\"></span>(<span class=\"_ _e\"></span><span class=\"ls5b\">a <span class=\"_ _20\"></span></span>new <span class=\"_ _e\"></span>subsidiary <span class=\"_ _e\"></span>inc<span class=\"_ _e\"></span>orporated <span class=\"_ _e\"></span>in<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>2022<span class=\"_ _e\"></span>)<span class=\"ls95\">, </span>which <span class=\"_ _24d\"> </span>are <span class=\"_ _57\"> </span>companies <span class=\"_ _57\"> </span>that <span class=\"_ _57\"> </span>s<span class=\"_ _e\"></span>upply <span class=\"_ _24d\"> </span>speci<span class=\"_ _e\"></span>alists <span class=\"_ _57\"> </span>in <span class=\"_ _24d\"> </span>consulti<span class=\"_ _e\"></span>ng, <span class=\"_ _24d\"> </span>services, <span class=\"_ _57\"> </span>engin<span class=\"_ _e\"></span>eering <span class=\"_ _24d\"> </span>and <span class=\"_ _7c\"> </span>pr<span class=\"_ _2\"></span>ocurement, <span class=\"_ _24d\"> </span>cr<span class=\"_ _e\"></span>eating <span class=\"_ _24d\"> </span>v<span class=\"_ _e\"></span>alue <span class=\"_ _24d\"> </span>b<span class=\"_ _e\"></span>y<span class=\"_ _e\"></span> delivering<span class=\"_ _2\"></span> solutions based on international best practice w<span class=\"_ _e\"></span>hile fully complying with regulated business environments; o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Re.Alto-Energy <span class=\"_ _e\"></span>BV/SRL <span class=\"_ _20\"></span>and Re.Alto-Energy <span class=\"_ _e\"></span>GmbH, <span class=\"_ _e\"></span>a <span class=\"_ _20\"></span>start-up f<span class=\"_ _e\"></span>ounded <span class=\"_ _e\"></span>in <span class=\"_ _e\"></span>August <span class=\"_ _e\"></span>2019 <span class=\"_ _20\"></span>which <span class=\"_ _e\"></span>is <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>first <span class=\"_ _e\"></span>E<span class=\"_ _e\"></span>uropean <span class=\"_ _e\"></span>digital </span></span>marketp<span class=\"_ _2\"></span>lace for energy data and services;<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Windgrid, <span class=\"_ _e\"></span>a <span class=\"_ _20\"></span>new <span class=\"_ _20\"></span>entity <span class=\"_ _e\"></span>created <span class=\"_ _20\"></span>during <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>he <span class=\"_ _e\"></span>reporting <span class=\"_ _20\"></span>period <span class=\"_ _e\"></span>20<span class=\"_ _e\"></span>22, <span class=\"_ _e\"></span>w<span class=\"_ _e\"></span>hich <span class=\"_ _e\"></span>was<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>est<span class=\"_ _e\"></span>ablished <span class=\"_ _20\"></span>to <span class=\"_ _e\"></span>manage <span class=\"_ _20\"></span>expected <span class=\"_ _e\"></span>increase <span class=\"_ _e\"></span>in<span class=\"_ _20\"></span> </span></span>investmen<span class=\"_ _2\"></span>ts in renewable energy production and the offshore grid exp<span class=\"_ _e\"></span>ansion. The CODM has been identified<span class=\"_ _2\"></span> by the group as t<span class=\"_ _e\"></span>he Boards of Directors, CEOs and Management Committees of ea<span class=\"_ _e\"></span>ch segment. The CODM periodically re<span class=\"_ _2\"></span>views the performance of the gr<span class=\"_ _e\"></span>oup's segments using various indicators such as revenue, EBITDA and operating profit. The information presented to the CODM follows the group's IFRS accounting policies, so no reconciling items have to be disclosed. 4.2 <span class=\"_ _235\"> </span>Elia Transmission (Belgium) The table be<span class=\"_ _2\"></span>low shows the 2022 consolidated results f<span class=\"ls5b\">or</span> <span class=\"_ _e\"></span>Elia Transmission (Belgium) Result<span class=\"_ _2\"></span>s Elia Tr<span class=\"_ _e\"></span>ansmission  <span class=\"_ _2\"></span>(in \u20ac million) \u2212  <span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span> Differen<span class=\"_ _2\"></span>ce (%) <span class=\"_ _e\"></span> period<span class=\"_ _2\"></span> ended 31 December Revenue, other income an<span class=\"_ _2\"></span>d net income (expense) from 1,561.3 1,199.5 30.2% settlement me<span class=\"_ _2\"></span>chanism<span class=\"_ _e\"></span> Revenues 1,420.4 1,009.8 40.7% Other in<span class=\"_ _2\"></span>come<span class=\"_ _e\"></span> 147.6 68.3 116.1% Net income<span class=\"_ _2\"></span> (expense) from settlement mechanism<span class=\"_ _e\"></span> (6.7) 121.4 (105.5<span class=\"_ _2\"></span>%) Depreciation, amortisa<span class=\"_ _2\"></span>tion, impairment and changes in (214.4) (205.1) 4.5% provisions  Results from operatin<span class=\"_ _2\"></span>g activities <span class=\"_ _e\"></span> 259.6 224.8 15.5% Equity accoun<span class=\"_ _2\"></span>ted investees<span class=\"_ _e\"></span> 2.4 2.3 3.3% EBIT 262.0 227.1 15.4% EBITDA 476.4 432.2 10.2% Finance<span class=\"_ _2\"></span> income 1.3 1.7 (23.5%) Finance<span class=\"_ _2\"></span> costs <span class=\"_ _e\"></span> (63.7) (64.8) (1.7%) Income tax exp<span class=\"_ _2\"></span>enses <span class=\"_ _e\"></span> (42.7) (32.9) 29.7% Net prof<span class=\"_ _2\"></span>it<span class=\"_ _e\"></span> 156.9 131.0 19.8% Consolidated<span class=\"_ _2\"></span> statement of financial position  31 Decembe<span class=\"_ _2\"></span>r 2022<span class=\"_ _e\"></span> 31 Decembe<span class=\"_ _2\"></span>r 2021<span class=\"_ _e\"></span>  Differen<span class=\"_ _2\"></span>ce (%) <span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Total a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 7,848.6 7,153.5 9.7% Capital expenditures 449.0 417.2 7.6% Net financia<span class=\"_ _2\"></span>l debt<span class=\"_ _e\"></span> 2,916.2 3,441.0 (15.3%) The tariff methodology <span class=\"_ _2\"></span>approved by the CREG on <span class=\"_ _e\"></span>7 November 2019 came into force in 2020. The methodology is applicable for a four-year period (2020 <span class=\"ff42\">\u2013</span> 2023). See Note 9.1 for more in<span class=\"_ _2\"></span>forma<span class=\"_ _e\"></span>tion about the new regulatory framework.  Financial Elia Transmission<span class=\"_ _2\"></span>'s revenue<span class=\"ff3f\"> <span class=\"ff42\">was up 30.2% compared wi<span class=\"_ _e\"></span>th last yea<span class=\"_ _2\"></span>r, increasing from \u20ac1,199.5 million to \u20ac1,561.3 million. Revenue </span></span>was impacted by a<span class=\"_ _2\"></span> higher regulated net profit, higher depreciations linked to the growing asset base, one<span class=\"_ _e\"></span>-off tariff compensation for the financial cost<span class=\"_ _2\"></span> linked to the capital increase (i.e. portion allocated to ETB) and higher costs for ancillary services. Higher a<span class=\"_ _e\"></span>ncillary services re<span class=\"_ _2\"></span>sulted from the high gas prices caused by the war in Ukraine and, to a lesser, extent the increase in imb<span class=\"_ _e\"></span>alance volume caused b<span class=\"_ _2\"></span>y the increase in the share occupied by renewab<span class=\"_ _e\"></span>les in the energy mix. The table be<span class=\"_ _2\"></span>low provides more details about revenue component changes:<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Difference (%) Grid revenue: 1,415.8 1,006.0 40.7%   <span class=\"ls0\"> Grid connection </span>44.8 45.1 (0.6%)   <span class=\"ls0\"> Management and development of grid in<span class=\"_ _2\"></span>frastructure<span class=\"_ _e\"></span> </span>475.3 480.6 (1.1%)   <span class=\"ls0\"> Management of the electrical system </span>149.8 149.0 0.6%   <span class=\"ls0\"> Compensation for imbalances </span>365.0 220.6 65.4%   <span class=\"ls0\"> Market integration </span>22.2 23.2 (4.0%)   <span class=\"ls0\"> International revenue </span>358.6 87.5 309.6% Last mile connect<span class=\"_ _2\"></span>ion<span class=\"_ _e\"></span> 3.5 2.9 19.6% Other revenue 1.1 0.8 27.3% Subtotal r<span class=\"_ _2\"></span>evenue 1,420.4 1,009.8 40.7% Other in<span class=\"_ _2\"></span>come<span class=\"_ _e\"></span> 147.6 68.3 116.1% Net income<span class=\"_ _2\"></span> (expense) from settlement mechanism<span class=\"_ _e\"></span> (6.7) 121.4 (105.5<span class=\"_ _2\"></span>%) Total revenue and<span class=\"_ _2\"></span> other income<span class=\"_ _e\"></span> 1,561.3 1,199.5 30.2% Revenues from<span class=\"_ _2\"></span> the <span class=\"ff40\">management and development of grid infrastructure</span>, the <span class=\"ff40\">management of the electrical system</span><span class=\"ls1d\">, </span><span class=\"ff40\">m<span class=\"_ _e\"></span>arket </span>integration<span class=\"ff3f\"> and </span>grid connection<span class=\"ff3f\"> remained stable<span class=\"_ _2\"></span> compa<span class=\"_ _e\"></span>red to 2021. <span class=\"_ _e\"></span> </span>Services rendered in the area o<span class=\"_ _2\"></span>f energy management and the individual balancing of balancing groups are paid under <span class=\"_ _e\"></span><span class=\"ff40\">revenues from </span>compensation<span class=\"_ _2\"></span> for imbalances<span class=\"ff3f\">. These revenues, which increased from <span class=\"ff42\">\u20ac2<span class=\"_ _e\"></span>20.6 million to \u20ac365.0</span> million (+65.4%), were largely due to </span>the tar<span class=\"_ _2\"></span>iff for maintaining and restoring the residual balance of individual access responsible parties (+\u20ac147.8 <span class=\"_ _e\"></span><span class=\"ff3f\">million). The higher balance </span>activation co<span class=\"_ _2\"></span>sts due to the increase in gas prices caused <span class=\"_ _e\"></span>by the war in Ukraine and, to a lesser extent, the increase in imbalance volume caused b<span class=\"_ _2\"></span>y the increase in the share occupied by renewab<span class=\"_ _e\"></span>les (in particular<span class=\"_ _2\"></span> offshore wind) <span class=\"_ _e\"></span>- which are more heavily influenced by forecast<span class=\"_ _2\"></span> differences in the generation mix - we<span class=\"_ _e\"></span>re the main drivers of the revenue increase.   International <span class=\"_ _2\"></span>revenue<span class=\"ff3f\"> increased <span class=\"ff42\">to \u20ac358.6 million (+309.6%)<span class=\"_ _e\"></span></span>, mainly due to increasing congestion income on the border with France. </span>Indeed<span class=\"_ _2\"></span>, the prices in France are higher than in the rest of Europe due to nuclear outages, and Belgium, as direct ne<span class=\"_ _e\"></span>ighbour of France, has a big<span class=\"_ _2\"></span> share of the congestion revenues linked to price spread with France.<span class=\"_ _e\"></span> The<span class=\"ff40\"> last mile connection (<span class=\"_ _2\"></span>previously called transfer of asset from customers) increased <span class=\"ff3f\">co<span class=\"_ _e\"></span>mpared to the previous year, so driving </span></span>the further<span class=\"_ _2\"></span> electrification of the power sector, while <span class=\"ff40\">other <span class=\"_ _e\"></span>revenues</span> also increased, mainly due to works delivered to third parties. The <span class=\"ff40\">settlement mechan<span class=\"_ _2\"></span>ism<span class=\"ff3f\"> decreased from <span class=\"ff42\">\u20ac121.4</span> milli<span class=\"_ _e\"></span>on in 2021 to -<span class=\"ff42\">\u20ac6.7</span> million in 2022 and encompassed both deviations in the </span></span>curren<span class=\"_ _2\"></span>t year from the budget approved by the regulator (-<span class=\"ff42\">\u20ac132.4 million) and the settlement of net surpluses from the previous tariff </span>period (\u20ac<span class=\"ff3f\">125.7 million). The opera<span class=\"_ _2\"></span>ting surplus (<span class=\"_ _e\"></span>-<span class=\"ff42\">\u20ac132.4 million), </span>with respect to budgeted costs and revenue authorised by the re<span class=\"_ _2\"></span>gulator, </span>will be returned<span class=\"_ _2\"></span> to consumers in a future tariff period. The surplus was primarily the result of higher costs for ancillary s<span class=\"_ _e\"></span><span class=\"ff42\">ervices (+\u20ac228.6 </span>million), h<span class=\"_ _2\"></span>igher influenceable costs (+\u20ac<span class=\"_ _e\"></span><span class=\"ff3f ls5b\">21<span class=\"ls0\">2.7 </span></span>million) and a higher net profit (+\u20ac<span class=\"ff3f\">28.7 million). This was more than offset by an increase in </span>tariff sale<span class=\"_ _2\"></span>s (-<span class=\"ff42\">\u20ac247.0 million), which was mainly driven by imbalance compensations, and higher international and other sales (<span class=\"_ _e\"></span></span>-<span class=\"ff42\">\u20ac396.7 </span>million), inclu<span class=\"_ _2\"></span>ding the within-<span class=\"ff42\">period Cap &amp; Floor adjustment for Nemo Link (\u20ac69.1 million), as the cap surplus needs to be returned to the </span>tariffs. EBITDA<span class=\"ff3f\"> <span class=\"ff42\">rose to \u20ac</span>476.4 million (+10.2%) due to a high<span class=\"_ _2\"></span>er regulated net profit, higher depreciations linked to the growing asset base an<span class=\"_ _e\"></span>d </span>higher f<span class=\"_ _2\"></span>inancial costs all passed through into revenue. The <span class=\"_ _e\"></span><span class=\"ff40\">EBIT </span>i<span class=\"_ _e\"></span>ncrease wa<span class=\"_ _2\"></span>s more pronounced<span class=\"ff40\"> </span>(+15.4%), mainly due the lower depre<span class=\"_ _2\"></span>ciations of assets not covered by tariffs, being the in<span class=\"_ _e\"></span>tangible a<span class=\"_ _2\"></span>ssets expensed during the previous regulatory period an<span class=\"_ _e\"></span>d activated under<span class=\"_ _2\"></span> IFRS and for leasing contracts. The contribution of equity-<span class=\"ff42\">acc<span class=\"_ _e\"></span>ounted investments remained flat at \u20ac2.4 million, linked t<span class=\"_ _2\"></span>o the </span>contribu<span class=\"_ _2\"></span>tion from HGRT. Net finance cost <span class=\"ff3f\">sligh<span class=\"_ _2\"></span>tly decreased (-1.<span class=\"_ _e\"></span>1%) compared with the previo<span class=\"_ _2\"></span>us year. This was mainly driven by the higher activation of </span>borro<span class=\"_ _2\"></span>wing costs due to the growth of the asset base (\u20ac2.1 million) and partially offset by other financial co<span class=\"_ _2\"></span>sts. The fi<span class=\"_ _e\"></span>nanci<span class=\"_ _e\"></span><span class=\"ff3f\">al costs linked </span>to Elia Grou<span class=\"_ _2\"></span>p\u2019s capital increase were allocated to the Belgian regulated ac<span class=\"_ _e\"></span><span class=\"ff3f\">tivities on a pro-rata basis in accordance with the use of </span>proceeds. Under IF<span class=\"_ _2\"></span>RS, these costs (\u20ac3.6 million) are directly accounted through equity. During 2022, ETB did not tap into the<span class=\"ff3f\"> de<span class=\"_ _e\"></span>bt </span>market and had a<span class=\"_ _2\"></span> well-balanced debt maturity profile. The<span class=\"_ _e\"></span> average cost of debt remained at 1.9% at the end 2022 and all outstanding debt had a f<span class=\"_ _2\"></span>ixed coupon.<span class=\"_ _e\"></span> Net prof<span class=\"_ _2\"></span>it <span class=\"ff42\">rose by 19.8% to \u20ac156.9 million, mainly due to the following:<span class=\"ff3f\"> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3 ls27\">A <span class=\"ff40 ls0\">h<span class=\"_ _2\"></span>igher fair remuneration<span class=\"ff3f\"> <span class=\"ff42\">(+\u20ac12.1 million</span>) due to asset growth and higher equity. The increase in equity was mainly driven by </span></span></span></span>the proceed<span class=\"_ _2\"></span>s allocated to the Belgian regulated activities (\u20ac290.1 million) following Elia Group\u2019s capital increase. <span class=\"ff3f\">A<span class=\"_ _e\"></span>dditionally, the </span>fair remuneration<span class=\"_ _2\"></span> benefitted from the ca<span class=\"_ _e\"></span>pital grant received from<span class=\"_ _2\"></span> the Federal Government in relation to the Princess Elisabeth Island (\u20ac73.1<span class=\"_ _2\"></span> million net of deferred tax) and recognised as part of the regulated equity.<span class=\"ff3f\"> <span class=\"_ _e\"></span> </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Incre<span class=\"_ _2\"></span>ase in <span class=\"ff40\">incentives</span> <span class=\"ff42\">(+\u20ac1.4 million), reflecting a solid operational pe</span>rformance, primarily linked to a better performance on the </span></span>incentive for inno<span class=\"_ _2\"></span>vation, customer satisfaction and influenceable costs and partially offset by lower incentive for interconn<span class=\"_ _e\"></span>ection capacity. Driven by the growth o<span class=\"_ _2\"></span>f the activities, the efficiency <span class=\"_ _e\"></span>gain on controllable costs slightly decreased compared with the previous <span class=\"_ _2\"></span>year, while the net contribution from incentives benefitted from a reduction in the average tax rate due to a higher innovation<span class=\"_ _2\"></span> income deduction.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Employe<span class=\"_ _2\"></span>e and other provisions<span class=\"ff3f\"> <span class=\"ff42\">(+\u20ac7.9 </span>million), mainly driven by higher contributions to plan assets. <span class=\"_ _e\"></span> </span></span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Higher<span class=\"_ _2\"></span> <span class=\"ff40\">capitalised borrowing costs</span> <span class=\"ff42\">due to a higher level of assets under construction (+\u20ac1.7 million).<span class=\"_ _e\"></span></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">A one-<span class=\"_ _2\"></span>off <span class=\"ff40\">tariff compensation</span> <span class=\"ff42\">for the financial costs linked to the capital increase (+\u20ac</span>3.6 <span class=\"_ _e\"></span>million). </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Regu<span class=\"_ _2\"></span>latory settlements<span class=\"ff3f\"> <span class=\"ff42\">and the reversal of provision for the influenceable incentive following the Saldi 2021 review (+\u20ac2.2 </span></span></span></span>million). \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Oth<span class=\"_ _2\"></span>er<span class=\"ff3f\"> (-<span class=\"ff42\">\u20ac3.0 million): this was primarily due to share</span>-base<span class=\"_ _e\"></span>d payment expenses linked to the capital increase in favour of members </span></span></span>of staff (-<span class=\"ff42\">\u20ac1.7 million),deferred tax <span class=\"_ _2\"></span>effects (<span class=\"ff3f\">-</span>\u20ac2.<span class=\"_ _e\"></span>4 million) and other restatements (<span class=\"ff3f\">-</span>\u20ac0.6 million), partially offset by the lower </span>depre<span class=\"_ _2\"></span>ciation of software and hardware (+\u20ac1.4 million) and less damage to electrical installations comp<span class=\"_ _e\"></span><span class=\"ff3f\">ared with the <span class=\"_ _e\"></span>previous year </span>(+\u20ac0.3 million)<span class=\"_ _2\"></span>.<span class=\"ff3f\"> </span>Total assets<span class=\"_ _2\"></span> <span class=\"ff3f\">increased by <span class=\"ff42\">\u20ac695.1</span> <span class=\"ff42\">million to \u20ac</span>7,848.6 million due to the realisation of the investment programme and higher liquidity. <span class=\"_ _e\"></span> </span>Net financ<span class=\"_ _2\"></span>ial debt <span class=\"ff42\">dropped to \u20ac<span class=\"ff3f\">2,916.2 million (-</span>15.3%<span class=\"_ _e\"></span>), as ETB\u2019s <span class=\"ff3f\">CAPE<span class=\"_ _e\"></span>X pro<span class=\"_ _2\"></span>gramme was fully financed by the proceeds from the </span></span>capital increase and by <span class=\"_ _2\"></span>cash flows from operating activitie<span class=\"_ _e\"></span>s, which were positively im<span class=\"_ _2\"></span>pacted by higher cash inflows from levi<span class=\"_ _e\"></span>es and the cap surp<span class=\"_ _2\"></span>lus paid by Nemo Link (\u20ac69.1 million, which need<span class=\"_ _e\"></span>s to<span class=\"ff3f\"> be returned to the tariffs). The sustainability-</span>linked R<span class=\"_ _e\"></span>CF (\u20ac650 million) and<span class=\"_ _2\"></span> the commercia<span class=\"_ _2\"></span>l paper (\u20ac300 million) were fully undrawn at the end of 2022. S&amp;P Global confirmed ETB\u2019s rating at BB<span class=\"_ _e\"></span>B+ with a s<span class=\"_ _e\"></span><span class=\"ff3f\">table </span>outlook a<span class=\"_ _2\"></span>t the end of 2022.<span class=\"_ _e\"></span> 4.3 <span class=\"_ _235\"> </span>50Hertz Trans<span class=\"_ _e\"></span>mission (Germ<span class=\"_ _2\"></span>any) The table be<span class=\"_ _2\"></span>low shows the 2022 consolidated results for 50Hertz Transmission (Germany) system operator activities in Germany.<span class=\"_ _e\"></span> Result<span class=\"_ _2\"></span>s 50Hertz Transmission (Germany) (in \u20ac million) \u2212 <span class=\"_ _e\"></span><span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span> Differen<span class=\"_ _2\"></span>ce (%) <span class=\"_ _e\"></span> period<span class=\"_ _2\"></span> ended 31 December Revenue, other income an<span class=\"_ _2\"></span>d net income (expense) fro<span class=\"ls8f\">m </span>2,592.7 1,716.9 50.9% settlement me<span class=\"_ _2\"></span>chanism<span class=\"_ _e\"></span> Revenues 2,222.4 1,569.9 41.6% Other in<span class=\"_ _2\"></span>come<span class=\"_ _e\"></span> 125.9 95.1 32.4% Net income<span class=\"_ _2\"></span> (expense) from settlement mechanism<span class=\"_ _e\"></span> 244.4 51.9 n.r. Depreciation, amortisa<span class=\"_ _2\"></span>tion, impairment and changes in (297.3) (261.2) 13.8% provisions  Results from operatin<span class=\"_ _2\"></span>g activities <span class=\"_ _e\"></span> 314.1 272.9 15.1% EBIT 314.1 272.9 15.1% EBITDA 611.5 534.0 14.5% Finance<span class=\"_ _2\"></span> income 73.9 2.1 3419.0<span class=\"_ _2\"></span>%<span class=\"_ _e\"></span> Finance<span class=\"_ _2\"></span> costs<span class=\"_ _e\"></span> (46.6) (36.9) 26.4% Income tax exp<span class=\"_ _2\"></span>enses<span class=\"_ _e\"></span> (105.3) (72.8) 44.6% Net prof<span class=\"_ _2\"></span>it<span class=\"_ _e\"></span> 236.1 165.4 42.7% Of which attributable to the Elia<span class=\"_ _2\"></span> Group<span class=\"_ _e\"></span> 188.9 132.3 42.8% Consolidated<span class=\"_ _2\"></span> statement of financial position  31 Decembe<span class=\"_ _2\"></span>r 2022<span class=\"_ _e\"></span> 31 Decembe<span class=\"_ _2\"></span>r 2021<span class=\"_ _e\"></span>  Differen<span class=\"_ _2\"></span>ce (%) <span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Total a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 11,638<span class=\"_ _2\"></span>.1<span class=\"_ _e\"></span> 9,941.3 17.1% Capital expenditures 1,135.9 880.4 29.0% Net financia<span class=\"_ _2\"></span>l debt<span class=\"_ _e\"></span> 1,255.3 1,014.9 23.7% 50Hertz Transmission\u2019s<span class=\"_ _2\"></span> total r<span class=\"ff40\">evenue<span class=\"ff3f\"> <span class=\"_ _e\"></span>and other income increased compared with 2021 (+51.0%). </span></span>Total revenues are deta<span class=\"_ _2\"></span>iled in the table below.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Difference (%) Grid revenue: 2,213.1 1,561.3 41.7%   <span class=\"ls0\"> Revenue from incentive regulation </span>862.7 911.8 (5.4%)   <span class=\"ls0\"> Revenue from offshore regu<span class=\"_ _2\"></span>lation<span class=\"_ _e\"></span> </span>295.1 294.7 0.1%   <span class=\"ls0\"> Energy revenue </span>1,055.4 354.9 197.4% Other revenue (in<span class=\"_ _2\"></span>cl. last mile connection)<span class=\"_ _e\"></span> 9.2 8.6 7.1% Subtotal r<span class=\"_ _2\"></span>evenue 2,222.4 1,569.9 41.6% Other in<span class=\"_ _2\"></span>come<span class=\"_ _e\"></span> 125.9 95.1 32.4% Net income<span class=\"_ _2\"></span> (expense) from settlement mechanism<span class=\"_ _e\"></span> 244.4 51.9 370.9% Total revenue and<span class=\"_ _2\"></span> other income<span class=\"_ _e\"></span> 2,592.6 1,716.9 51.0% Revenues f<span class=\"_ _2\"></span>rom incentive regulation <span class=\"ff3f\">co<span class=\"_ _e\"></span>nsist of grid tariffs before the settlement mechanism; the<span class=\"_ _2\"></span>y are primarily driven by the regulatory </span>remuneration for onshore activities (<span class=\"_ _2\"></span>revenue cap). <span class=\"_ _e\"></span> Revenues from<span class=\"_ _2\"></span> incentive regulation decreased by <span class=\"_ _e\"></span><span class=\"ff42\">\u20ac49.1</span> million, coming from lower volume effects than last year a<span class=\"_ _e\"></span>nd lower revenues from the re<span class=\"_ _2\"></span>venue cap. <span class=\"_ _e\"></span> The infeed o<span class=\"_ _2\"></span>f renewable energy into the distribution grid was higher than expected, leading to lower volumes <span class=\"_ _2\"></span>in th<span class=\"_ _e\"></span>e transmiss<span class=\"_ _e\"></span>ion grid. Consequently, the volume effe<span class=\"_ _2\"></span>ct was lower than in previo<span class=\"_ _e\"></span>us years (-<span class=\"ff42 ls5b\">\u20ac9</span>9.2 million). <span class=\"_ _e\"></span> The revenue cap decrease (-<span class=\"ff42\">\u20ac14.3</span> million) was ma<span class=\"_ _2\"></span>inly dri<span class=\"_ _e\"></span>ven by higher payba<span class=\"_ _2\"></span>cks for old regulatory balances via the regulatory account (-<span class=\"ff42\">\u20ac67<span class=\"_ _2\"></span>.3 million<span class=\"_ _e\"></span><span class=\"ff3f\">). Additionally, the pass-through energy costs for reserve power plants decreased compared to 2021 <span class=\"_ _e\"></span>(-</span>\u20ac14.7<span class=\"ff3f\"> million). </span></span>These effects <span class=\"_ _2\"></span>were partially compensated for by an increased allowance for onshore investments (<span class=\"_ _e\"></span><span class=\"ff42\">+\u20ac21.7</span> million) <span class=\"_ _e\"></span>as well as a h<span class=\"_ _2\"></span>igher cost allowance<span class=\"_ _2\"></span> for ancillary services (+\u20ac48.5<span class=\"ff3f\"> million). <span class=\"_ _e\"></span> </span>Furtherm<span class=\"_ _2\"></span>ore, there was no pass-through payback related <span class=\"_ _e\"></span>to the old regulatory offshore mechanism compared with last year (<span class=\"ff42\">+\u20ac64.5 </span>million).<span class=\"fc1d\"> </span>Revenues f<span class=\"_ _2\"></span>rom offshore surcharge <span class=\"ff3f\">includ<span class=\"_ _e\"></span>e all revenues derived<span class=\"_ _2\"></span> from the offshore grid surcharge. This includes regulatory </span>remuneration for the<span class=\"_ _2\"></span> connection of offshore wind farms, t<span class=\"_ _e\"></span>he reimbursement of off<span class=\"_ _2\"></span>shore liability payments and offshore costs charged to 50Hertz b<span class=\"_ _2\"></span>y third parties, e.g. other TSOs.<span class=\"_ _e\"></span> The o<span class=\"_ _2\"></span>ffshore surcharge revenues increased slightly compared with the previous year (+\u20ac0.4 million)<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>as the remuneration of 50Hertz\u2019s own offshore grid co<span class=\"_ _2\"></span>nnection costs increased (+\u20ac25.5 million), driven by ongoing offshore investments (Ostwind 2 and Ostwind <span class=\"ff3f\">3<span class=\"_ _e\"></span>). This </span>effect was offset b<span class=\"_ _2\"></span>y the decrease in the pass<span class=\"_ _e\"></span>-through costs charged to 50Hertz by third parties compared with 2021 (-<span class=\"ff42\">\u20ac25.1 million).<span class=\"_ _e\"></span></span><span class=\"fc1d\"> </span>Energy revenue<span class=\"_ _2\"></span>s<span class=\"ff3f\"> include all revenues related to system <span class=\"_ _e\"></span>opera<span class=\"_ _2\"></span>tions and are mostly corresponding costs charged on to third parties, </span>such as redispatch me<span class=\"_ _2\"></span>asures, costs for reserve power pla<span class=\"_ _e\"></span>nts or contro<span class=\"_ _2\"></span>l power cos<span class=\"_ _e\"></span>ts. Revenues generated from auctioning off interconnector capa<span class=\"_ _2\"></span>city are also included in this section.<span class=\"_ _e\"></span> Energy re<span class=\"_ _2\"></span>venues strongly increased compared to the previous year (+\u20ac700.5 million), due to the continuing rise in energy pric<span class=\"_ _e\"></span><span class=\"ff3f ls5b\">es<span class=\"ls1d\">. <span class=\"_ _e\"></span><span class=\"ls0\">The </span></span></span>control power c<span class=\"_ _2\"></span>osts cha<span class=\"_ _e\"></span>rged to balancing groups increased significantly (<span class=\"ff42\">+\u20ac386.0 million), as did the charges to other TSOs for </span>redispatch me<span class=\"_ _2\"></span>asures <span class=\"ff42\">(+\u20ac188.5 million). Furthermore, </span>rev<span class=\"_ _e\"></span>enues from the auctioning of interconnector capacities benefitted from price developments (+\u20ac<span class=\"ff3f\">77.9 million), as <span class=\"_ _2\"></span>well as <span class=\"ff42\">rev<span class=\"_ _e\"></span>enues from the compensation of involuntary exchanges at the grid\u2019s borders (+\u20ac<span class=\"_ _e\"></span>33.1 </span></span>million).  Other revenue<span class=\"_ _2\"></span>s<span class=\"ff3f\"> (including last-mile connection) increase<span class=\"_ _e\"></span>d (<span class=\"ff42\">+\u20ac0.5 million), mainly due to higher revenues re<span class=\"_ _2\"></span>ceived from the Inter<span class=\"_ _e\"></span><span class=\"ff3f\">-</span></span></span>Transmission System<span class=\"_ _2\"></span> Operator Compensation (ITC) mechanism. The ITC mechanism is based on an EU regulation and compensates TSOs for t<span class=\"_ _2\"></span>he costs of hosting cross-border electricity flows on their networks. TSOs contribute/receive funds based on electricity flows onto/from their n<span class=\"_ _2\"></span>ational transmission systems.<span class=\"_ _e\"></span> Other income<span class=\"ff3f\"> <span class=\"ff42\">rose (+\u20ac30.9 million), as a<span class=\"_ _2\"></span> result of higher own work capitalised following the increase in staffing to execute and manage </span></span>the investment <span class=\"_ _2\"></span>programme (+\u20ac18.3 million). Furthermore, other operating <span class=\"_ _e\"></span><span class=\"ff3f\">revenues increased (</span>+\u20ac9.1 <span class=\"ff3f\">million), including the capitalisation </span>of dismantling provisions <span class=\"_ _2\"></span>and higher charges for IT to third parties.<span class=\"_ _e\"></span><span class=\"fc1d\"> </span>The <span class=\"ff40\">net regulatory inco<span class=\"_ _2\"></span>me (expense) from settlement mechanism<span class=\"_ _e\"></span><span class=\"ff3f\"> neutralises regulatory time lags. It consists of two com<span class=\"_ _2\"></span>po<span class=\"_ _e\"></span>nents: </span></span>firstly, the neutralisation<span class=\"_ _2\"></span> of differences between cost allow<span class=\"_ _e\"></span>ances in the tar<span class=\"_ _2\"></span>iffs and the actual costs incurred for the curre<span class=\"_ _e\"></span><span class=\"ff42\">nt year (+\u20ac125.2 </span>million); se<span class=\"_ _2\"></span>condly, the balancing of said differences from prior years (+\u20ac119.1 million).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>EBITDA<span class=\"ff3f\"> increased to <span class=\"ff42\">\u20ac611.5 million (+14.5<span class=\"_ _2\"></span>%). The growing asset base benefitted the investment remuneration (+\u20ac77.6<span class=\"ff3f\"> <span class=\"_ _e\"></span>million). The </span></span></span>opex costs decreased a<span class=\"_ _2\"></span>s 50Hertz ramped down from a peak in the maintenance cycle while focussing on operational efficiency an<span class=\"ls5b\">d </span>safety, while a<span class=\"_ _2\"></span>lso benefitting from capitalised dismantling costs that were passed through under the offshore cost-<span class=\"_ _e\"></span>plus regulation (+\u20ac11.8 million). F<span class=\"_ _2\"></span>urthermore, the losses on asset disposal and trade debtors were reduced (+\u20ac5.6<span class=\"ff3f\"> million). In order to ensure the </span>energ<span class=\"_ _2\"></span>y transition is a success and manage the increasing complexity of system operations in the future, 50He<span class=\"_ _e\"></span>rtz continued to expand its talent pool, lea<span class=\"_ _2\"></span>ding to additional staffing costs (-<span class=\"ff42\">\u20ac16.3 mill<span class=\"_ _e\"></span>ion), </span>which was compensated for by the higher own work capitalised (<span class=\"ff42\">+\u20ac14.2 </span>million). Furthermore, <span class=\"_ _2\"></span>EBITDA benefited from one<span class=\"_ _e\"></span>-off revenues from the regulatory settlement and related provisions amounting to \u20ac23.4 million (<span class=\"ff3f\">-</span>\u20ac18.9 million). This se<span class=\"_ _2\"></span>ttlement was mainly <span class=\"_ _e\"></span>related<span class=\"_ _2\"></span> to an agreement on the offshore lump sum for the year 2018, while in 2021 it origina<span class=\"_ _2\"></span>ted from the refund of clawback amounts as part of the transition towards the Capital Cost Adjustment model in 2024.<span class=\"_ _e\"></span> There was a le<span class=\"_ _2\"></span>ss pronounced increase in <span class=\"ff40\">EBIT</span> <span class=\"ff42\">(+<span class=\"_ _e\"></span>\u20ac41.2 million) which was driven by increasing depreciations (</span>-<span class=\"ff42\">\u20ac37.3 million) following </span>the commissioning<span class=\"_ _2\"></span> of projects like Ostwind 2 (first cable system and Ar<span class=\"_ _e\"></span>cadis Ost 1 platform). Furthermore, operating provisions decrea<span class=\"_ _2\"></span>sed slightly compared with 2021 (<span class=\"ff42\">+<span class=\"_ _e\"></span>\u20ac1.1</span> million). No adjusted items occurred in <span class=\"ls5b\">2022</span>. The <span class=\"ff40\">net financia<span class=\"_ _2\"></span>l result <span class=\"ff42\">increased to \u20ac27.3 million (+\u20ac62<span class=\"_ _e\"></span>.0 million), <span class=\"ff3f\">driven primarily by the revaluation of provision for congestion </span></span></span>income from in<span class=\"_ _2\"></span>terconnectors to be returned to grid customers based on the strong upwards revision of the interest forward curve<span class=\"_ _e\"></span> amoun<span class=\"_ _2\"></span>ting to \u20ac67.5 million in 2022 (+\u20ac63.1 million compared to 2021).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Net prof<span class=\"_ _2\"></span>it<span class=\"ff3f\"> increased <span class=\"ff42\">to \u20ac236.1 million</span> (<span class=\"_ _e\"></span>+42.7%) as a result of: </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff42 fc3\">Higher<span class=\"_ _2\"></span> investment remuneration (+\u20ac54.4 million) following the growth of the asset base.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff42 fc3\">Higher<span class=\"_ _2\"></span> financial results (+\u20ac43.4 million), driven primarily by the re<span class=\"_ _2\"></span>valuation of long<span class=\"_ _e\"></span><span class=\"ff3f\">-term provisions. <span class=\"_ _e\"></span> </span></span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Decrea<span class=\"_ _2\"></span>sed <span class=\"ff42\">OPEX and other costs (+\u20ac12.3 million).</span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span>se effects were partially offset by: </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Higher<span class=\"_ _2\"></span> depreciations (-<span class=\"ff42\">\u20ac26.1 million) due to the commissioning of projects.<span class=\"_ _e\"></span></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Lower<span class=\"_ _2\"></span> regulatory settlement prior years (-<span class=\"ff42\">\u20ac13.2 million).</span> </span></span>Total assets<span class=\"_ _2\"></span> <span class=\"ff3f\">rose by <span class=\"ff42\">\u20ac1,696.8</span> million compar<span class=\"_ _e\"></span>ed with 2021, mainly due to a favorable development of the <span class=\"ff42\">EEG business (+\u20ac826.0 </span></span>million) and the<span class=\"_ _2\"></span> execution of the investment programme (\u20ac1,085.5 million). The <span class=\"ff40\">free cash flow<span class=\"ff3f\"> totalled -</span></span>\u20ac<span class=\"_ _e\"></span>359.2 million<span class=\"ff3f\"> and wa<span class=\"_ _2\"></span>s heavily </span>affected<span class=\"_ _2\"></span> by the high investment programme as well as the time<span class=\"_ _e\"></span>-lag in recovering the high energy costs. The cash flow on the EEG account only partially com<span class=\"_ _2\"></span>pensated for these effects (<span class=\"ff42\">+<span class=\"_ _e\"></span>\u20ac826.0</span> million). The parliament decided to reduce the EEG surcharge to zero as of 1 July 2022 in<span class=\"_ _2\"></span> order to relieve households and companies given increased electricity costs. In <span class=\"_ _e\"></span>future, the costs for promoting<span class=\"_ _2\"></span> RES will be finan<span class=\"_ _2\"></span>ced through the Energy and Climate Fund. 50Hertz will continue to act as a trustee.<span class=\"_ _e\"></span><span class=\"fc1d\"> </span>The <span class=\"ff40\">net financia<span class=\"_ _2\"></span>l debt<span class=\"ff3f\"> increased <span class=\"ff42\">by \u20ac240.4</span> million comp<span class=\"_ _e\"></span>ared with end of 2021, as the realisation of the investment programme was </span></span>partially financed by existing<span class=\"_ _2\"></span> liquidity, while the operating cash flow was negatively impacted by high energy costs. The EEG<span class=\"_ _e\"></span> cash inflow from h<span class=\"_ _2\"></span>igher energy prices only partially compensated for these effects. The EEG cash position as of December<span class=\"_ _e\"></span> 2022 amounted to \u20ac2,936<span class=\"_ _2\"></span>.0<span class=\"ff3f\"> </span>million. 50Hertz issued a second green bond of \u20ac750 million at the beginning of September with a tenor of 9 years and a fixed<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>rate o<span class=\"_ _2\"></span>f 3.28%, leading to an average cost of debt of 1.5% at the end of December 2022.<span class=\"_ _e\"></span><span class=\"fc1d\"> </span>4.4 <span class=\"_ _235\"> </span>Non-<span class=\"_ _e\"></span>regulated activities and Nem<span class=\"_ _2\"></span>o Link The table be<span class=\"_ _2\"></span>low shows the 2022 consolidated results for <span class=\"ff42\">t<span class=\"_ _e\"></span>he \u2018Non</span>-<span class=\"ff42\">regulated act<span class=\"_ _2\"></span>ivities and Nemo Link\u2019 segment<span class=\"ff3f\">.<span class=\"_ _e\"></span> </span></span>Result<span class=\"_ _2\"></span>s Non-regulated activities and Nemo Link <span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span> Differen<span class=\"_ _2\"></span>ce (%) <span class=\"_ _e\"></span> (in \u20ac million) \u2212 <span class=\"ff40\"> </span>period<span class=\"_ _2\"></span> ended 31 December Total revenues 5.9 28.7 (79.4%) Other in<span class=\"_ _2\"></span>come<span class=\"_ _e\"></span> 38.9 8.1 377.3% Depreciation, amortisa<span class=\"_ _2\"></span>tion, impairment and changes in (0.7) (0.5) 36.3% provisions  Results from operatin<span class=\"_ _2\"></span>g activities <span class=\"_ _e\"></span> (13.6) (6.8) 99.3% Share of profit<span class=\"_ _2\"></span> of equity accounted investees (net of income 37.1 47.1 (21.2%) tax) EBIT 23.6 40.3 (41.4%) EBITDA 24.3 40.8 (40.4%) Finance<span class=\"_ _2\"></span> income 3.8 0.1 3700.0<span class=\"_ _2\"></span>%<span class=\"_ _e\"></span> Finance<span class=\"_ _2\"></span> costs<span class=\"_ _e\"></span> (12.5) (9.0) 39.4% Income tax exp<span class=\"_ _2\"></span>enses<span class=\"_ _e\"></span> 0.4 0.5 (24.1%) Net prof<span class=\"_ _2\"></span>it<span class=\"_ _e\"></span> 15.2 31.9 (52.4%) Of which attributable to the Elia<span class=\"_ _2\"></span> Group<span class=\"_ _e\"></span> 15.2 31.9 (52.4%) Consolidated<span class=\"_ _2\"></span> statement of financial position  31 Decembe<span class=\"_ _2\"></span>r 2022<span class=\"_ _e\"></span> 31 Decembe<span class=\"_ _2\"></span>r 2021<span class=\"_ _e\"></span>  Differen<span class=\"_ _2\"></span>ce (%) <span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Total a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 1,946.5 1,654.0 17.7% Capital expenditures 0.9 1.6 (43.8%) Net financia<span class=\"_ _2\"></span>l debt<span class=\"_ _e\"></span> 260.1 430.4 (39.6%) Non-regulated revenue<span class=\"ff3f\"> increased by 21.5% <span class=\"ff42\">to \u20ac</span>44.7 million compared to 2021. This is the<span class=\"_ _2\"></span> result of high<span class=\"_ _e\"></span>er intersegment transactions </span>mainly between Elia Group SA, Elia T<span class=\"_ _2\"></span>ransmission Belgium and 50Hertz and partially offset by <span class=\"_ _e\"></span>lower revenues generated by Elia Grid Internationa<span class=\"_ _2\"></span>l (\u2018EGI\u2019) (<span class=\"ff3f\">-</span>\u20ac4.2 million), as prior year\u2019s revenu<span class=\"_ _e\"></span>es bene<span class=\"_ _2\"></span>fited from the commission<span class=\"ff3f\">i<span class=\"_ _e\"></span>ng of a turnkey project, while the </span>interna<span class=\"_ _2\"></span>tional consulting business is slowly increasing as a result of the pandemic revival. The effect of these intersegment t<span class=\"_ _e\"></span>ransactions is disclosed in \u2018Note 2.2<span class=\"_ _2\"></span>. Segment reconciliation\u2019.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Equity-accounted in<span class=\"_ _2\"></span>vestments<span class=\"ff3f\"> <span class=\"ff42\">contributed \u20ac37.1 millio<span class=\"_ _e\"></span>n to the Group\u2019s result, which is a<span class=\"_ _2\"></span>lmost entirely attributabl<span class=\"_ _e\"></span>e to <span class=\"ff40\">Nemo <span class=\"_ _e\"></span>Link<span class=\"ff3f\">. With </span></span></span></span>an availab<span class=\"_ _2\"></span>ility rate of 99.1%, Nemo Link remains one of the highest performing assets of its kind in the world. <span class=\"_ _e\"></span> In 2022<span class=\"ff42\">, geopolitical tensions put pressur<span class=\"_ _2\"></span>e on electricity markets, especially across the European continent because of the region\u2019s<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>dependence on Russian gas. This pressure was in<span class=\"_ _2\"></span>creased by the historically low level of nuclear availability in France. The s<span class=\"_ _e\"></span>pot N<span class=\"ls27\">BP </span>gas, which drives the UK electr<span class=\"_ _2\"></span>icity price, was traded fro<span class=\"_ _e\"></span>m May to October with a significa<span class=\"_ _2\"></span>nt discount compared to TTF gas, t<span class=\"_ _e\"></span><span class=\"ls5b\">he </span>reference gas pr<span class=\"_ _2\"></span>ice in Europe. This was because Great Brittan was better supplied by gas compared to the continent. As a resu<span class=\"_ _e\"></span>lt, Nemo Link was use<span class=\"_ _2\"></span>d very frequently for exports towards Belgium; it demonstrated its value to Belgian consumers by providing them with electricity at <span class=\"_ _2\"></span>lower prices to help with the energy crisis. Th<span class=\"_ _e\"></span>e Nemo L<span class=\"_ _2\"></span>ink interconnector highlights the importance of <span class=\"_ _e\"></span>similar links in providing<span class=\"_ _2\"></span> Belgium with access to energy that is produced <span class=\"_ _e\"></span>outside o<span class=\"_ _2\"></span>f the country whilst contributing to the functioning of com<span class=\"_ _e\"></span>petitive interna<span class=\"_ _2\"></span>tional market operations. This exceptional situation<span class=\"_ _2\"></span> during 2022 led to revenues of N<span class=\"_ _e\"></span>emo Lin<span class=\"_ _2\"></span>k amo<span class=\"ff42\">u<span class=\"_ _e\"></span>nting to \u20ac282.6 million, so exceeding (for the first time since it </span>began operating) the cumula<span class=\"_ _2\"></span>tive revenue cap by \u20ac137.6 <span class=\"_ _e\"></span>million. Its to<span class=\"_ _2\"></span>tal net profit reached \u20ac74.2 million for 2022, with a co<span class=\"_ _e\"></span><span class=\"ff3f\">nt<span class=\"_ _e\"></span>ribution to </span>Elia Group\u2019s n<span class=\"_ _2\"></span>et profit amounting to \u20ac37.1 millio<span class=\"_ _e\"></span><span class=\"ff3f ls5b\">n.<span class=\"ls0\"> </span></span>EBIT <span class=\"ff3f\">dropped to <span class=\"ff42\">\u20ac23.6</span> million (-<span class=\"ff42\">\u20ac16.7million). This decrease was primarily due to the lower con<span class=\"_ _2\"></span>tribution from Nemo Link (<span class=\"ff3f\">-<span class=\"_ _e\"></span></span>\u20ac9.9 million) </span></span>and the higher opera<span class=\"_ _2\"></span>ting costs for the holding and WindGrid driven by the pursuit of inorganic growth ambitions (<span class=\"_ _e\"></span>-<span class=\"ff42 ls78\">\u20ac6</span>.7<span class=\"_ _2\"></span> million). Following the drop in revenues, the contributio<span class=\"_ _2\"></span>n from EGI (-<span class=\"_ _e\"></span><span class=\"ff42\">\u20ac0.6 million) and re<span class=\"_ _2\"></span>.alto (<span class=\"_ _e\"></span><span class=\"ff3f\">-</span>\u20ac0.4 million) decreased.<span class=\"ff3f\"> </span></span>Net finance cost<span class=\"ff3f\"> <span class=\"ff42\">remained flat at \u20ac</span>8.8 <span class=\"ff42\">million, primarily comprising the interest cost linked to the sen<span class=\"_ _2\"></span>ior bond (\u20ac4.7 million), <span class=\"_ _e\"></span><span class=\"ff3f\">the cost </span></span></span>linked to t<span class=\"_ _2\"></span>he Nemo Link private placement (\u20ac2.9 million) and other financial costs linked to Elia Group SA. The pro<span class=\"ff3f\">-<span class=\"_ _e\"></span>rata costs linked to </span>the capita<span class=\"_ _2\"></span>l increase of Elia Group and allocated to Elia Group SA and Eurogrid International respectively are dir<span class=\"_ _e\"></span>ectly recognised in equity under IFRS (\u20ac3<span class=\"_ _2\"></span>.5 million).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Net prof<span class=\"_ _2\"></span>it<span class=\"ff3f\"> decreased by <span class=\"ff42\">\u20ac16.7</span> <span class=\"ff42\">million to \u20ac15.2 million, ma<span class=\"_ _e\"></span>inly as a re<span class=\"_ _2\"></span>sult of:<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Lower<span class=\"_ _2\"></span> contribution from Nemo Link (-<span class=\"ff42\">\u20ac9.9 million).<span class=\"_ _e\"></span></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Higher<span class=\"_ _2\"></span> costs driven by the establishment of WindGrid and business development activities (-<span class=\"ff42\">\u20ac6.9 million).</span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Lower<span class=\"_ _2\"></span> contribution from re.alto (-<span class=\"ff42\">\u20ac0.6 million).<span class=\"_ _e\"></span></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff42 fc3\">Other<span class=\"_ _2\"></span> items (+\u20ac0.7 million) driven by lower regulatory rejections (+\u20ac0.1 million), lo<span class=\"_ _2\"></span>wer other non<span class=\"_ _e\"></span><span class=\"ff3f\">-<span class=\"_ _e\"></span></span>regulated costs (+\u20ac0.8 million) </span></span>and partially off<span class=\"_ _2\"></span>set by a lower contribution from EGI (-<span class=\"ff42\">\u20ac0.<span class=\"_ _e\"></span>2 million).</span> Total assets<span class=\"_ _2\"></span> <span class=\"ff3f\">increased by 17.7%, <span class=\"ff42\">amounting to \u20ac</span>1,94<span class=\"_ _e\"></span>6.5 million (<span class=\"ff42\">+\u20ac292.5</span> million), primarily driven by the net proceeds from the capital </span>increase allocate<span class=\"_ _2\"></span>d to the non-regulated segment (<span class=\"ff42\">+\u20ac9<span class=\"_ _e\"></span>8.8 million) and divide</span>nd payments from subsidiaries offset by the payment of last year\u2019s dividend (<span class=\"ff3f\">-</span>\u20ac120.3 million). This led t<span class=\"_ _2\"></span>o a drop in net financial debt of <span class=\"_ _e\"></span>\u20ac170.3 <span class=\"ff3f\">million to </span>\u20ac260.1 <span class=\"ff3f\">million. </span>4.5 <span class=\"_ _235\"> </span>Recon<span class=\"_ _e\"></span>ciliation of inf<span class=\"_ _2\"></span>ormation on reportable segments to IFRS <span class=\"_ _e\"></span>amounts Consolidated<span class=\"_ _2\"></span> results (in \u20ac million) \u2212 <span class=\"_ _e\"></span><span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>period<span class=\"_ _2\"></span> ended 31 December Elia  50Hertz  Non-Consolidation<span class=\"_ _2\"></span>  Elia Group Transmission  Transmission  regulated entries &amp;  activities and<span class=\"_ _2\"></span> intersegment  Nemo Link transact<span class=\"_ _2\"></span>ions<span class=\"_ _e\"></span> ( a ) ( b ) ( c ) ( d ) ( a ) + ( b<span class=\"_ _2\"></span> ) + ( c ) +<span class=\"_ _2\"></span> ( d )<span class=\"_ _e\"></span> Revenue 1,420.4 2,222.4 5.9 (32.7) 3,616.0 Other in<span class=\"_ _2\"></span>come<span class=\"_ _e\"></span> 147.6 125.9 38.9 (52.7) 259.6 Net income<span class=\"_ _2\"></span> (expense) from <span class=\"_ _e\"></span> (6.7) 244.4 0.0 0.0 237.7 settlement me<span class=\"_ _2\"></span>chanism  Depreciation, amortisa<span class=\"_ _2\"></span>tion, impairment and changes in (214.4) (297.3) (0.7) 0.0 (512.4) provisions  Result<span class=\"_ _2\"></span>s from operating activities <span class=\"_ _e\"></span> 259.6 314.1 (13.6) (0.3) 559.8 Share of profit<span class=\"_ _2\"></span> of equity accounted investees, <span class=\"_ _e\"></span> 2.4 0.0 37.1 0.0 39.5 net of tax Earnings b<span class=\"_ _2\"></span>efore interest and tax (EBIT)<span class=\"_ _e\"></span> 262.0 314.1 23.6 (0.3) 599.4 Earnings b<span class=\"_ _2\"></span>efore depreciation, amortisation, interest 476.4 611.5 24.3 (0.3) 1,111.8 and tax (EBITDA) Finance<span class=\"_ _2\"></span> income 1.3 73.9 3.8 (3.6) 75.4 Finance<span class=\"_ _2\"></span> costs<span class=\"_ _e\"></span> (63.7) (46.6) (12.5) 3.9 (119.0) Income tax exp<span class=\"_ _2\"></span>enses<span class=\"_ _e\"></span> (42.7) (105.3) 0.4 0.0 (147.5) Profit att<span class=\"_ _2\"></span>ributable to the owners of the company<span class=\"_ _e\"></span> 156.9 188.9 15.2 0.0 361.0 Consolidated<span class=\"_ _2\"></span> statement of financial position  31.12.2022 31.12.2022 31.12.2022 31.12.2022 31.12.2022 (in \u20ac million)<span class=\"ff40\"> </span>Total a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 7,848.6 11,638<span class=\"_ _2\"></span>.1<span class=\"_ _e\"></span> 1,946.5 (838.9) 20,594<span class=\"_ _2\"></span>.3<span class=\"_ _e\"></span> Capital expenditures 449.0 1,135.9 0.9 0.0 1,585.8 Net financia<span class=\"_ _2\"></span>l debt<span class=\"_ _e\"></span> 2,916.2 1,255.3 260.1 0.0 4,431.6 Consolidated<span class=\"_ _2\"></span> results (in \u20ac million) \u2212 <span class=\"_ _e\"></span><span class=\"ff40\"> </span>2021<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Year ended 31<span class=\"_ _2\"></span> December<span class=\"_ _e\"></span> Elia  50Hertz  Non-Consolidation<span class=\"_ _2\"></span> Elia Group Transmission  Transmission  regulated entries &amp; activities and<span class=\"_ _2\"></span> intersegment Nemo Link transact<span class=\"_ _2\"></span>ions<span class=\"_ _e\"></span> ( a ) ( b ) ( c ) ( d ) ( a ) + ( b<span class=\"_ _2\"></span> ) + ( c ) +<span class=\"_ _2\"></span> ( d )<span class=\"_ _e\"></span> Revenue 1,009.8 1,569.9 28.7 (57.1) 2,551.2 Other in<span class=\"_ _2\"></span>come<span class=\"_ _e\"></span> 68.3 95.1 8.1 (36.4) 135.1 Net income<span class=\"_ _2\"></span> (expense) from <span class=\"_ _e\"></span> 121.4 51.9 0.0 0.0 173.3 settlement me<span class=\"_ _2\"></span>chanism  Depreciation, amortisa<span class=\"_ _2\"></span>tion, impairment and changes in (205.1) (261.2) (0.5) 0.0 (466.8) provisions  Result<span class=\"_ _2\"></span>s from operating activities <span class=\"_ _e\"></span> 224.8 272.9 (6.8) (0.2) 490.7 Share of profit<span class=\"_ _2\"></span> of equity accounted investees, <span class=\"_ _e\"></span> 2.3 0.0 47.1 0.0 49.3 net of tax Earnings b<span class=\"_ _2\"></span>efore interest and tax (EBIT)<span class=\"_ _e\"></span> 227.1 272.9 40.3 (0.2) 540.1 Earnings b<span class=\"_ _2\"></span>efore depreciation, amortisation, interest 432.2 534.0 40.8 (0.2) 1,006.9 and tax (EBITDA) Finance<span class=\"_ _2\"></span> income 1.7 2.1 0.1 0.0 3.9 Finance<span class=\"_ _2\"></span> costs<span class=\"_ _e\"></span> (64.8) (36.9) (9.0) 0.2 (110.5) Income tax exp<span class=\"_ _2\"></span>enses<span class=\"_ _e\"></span> (32.9) (72.8) 0.5 0.0 (105.1) Profit att<span class=\"_ _2\"></span>ributable to the owners of the company<span class=\"_ _e\"></span> 131.0 132.3 31.9 0.0 295.2 Consolidated<span class=\"_ _2\"></span> statement of financial position 31.12.2021 31.12.2021 31.12.2021 31.12.2021 31.12.2021 (in \u20ac million)<span class=\"ff40\"> </span>Total a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 7,153.5 9,941.3 1,654.0 (604.4) 18,144<span class=\"_ _2\"></span>.4<span class=\"_ _e\"></span> Capital expenditures 417.2 880.4 1.6 0.0 1,299.2 Net financia<span class=\"_ _2\"></span>l debt<span class=\"_ _e\"></span> 3,441.0 1,014.9 430.4 0.0 4,886.3 There are no significant <span class=\"_ _2\"></span>intersegment transactions.<span class=\"_ _e\"></span> The Group has no concentra<span class=\"_ _2\"></span>tion of customers in either of the operating segments.<span class=\"_ _e\"></span> 4.6 <span class=\"_ _235\"> </span>Adjus<span class=\"_ _e\"></span>ted items <span class=\"ff43\">\u2013</span> reconciliation table  N/A<span class=\"_ _2\"></span><span class=\"ls0\"> </span>5.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Items in the con<span class=\"_ _e\"></span>solidated state<span class=\"_ _2\"></span>ment of profit or loss and other compr<span class=\"_ _2\"></span>ehensive </span>income There were<span class=\"_ _2\"></span> no changes made to the basis of preparation and therefore no restatements of figures from previous years were required.<span class=\"_ _e\"></span> 5.1. <span class=\"_ _87\"> </span>Revenue, net income (expense) from settlement mechanism and other income (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Revenue, e<span class=\"_ _2\"></span>xcluding net income from settlement mechanism<span class=\"_ _e\"></span> 3,853.7 2,724.6   <span class=\"ls0\">Grid re<span class=\"_ _2\"></span>venue:<span class=\"_ _e\"></span> </span>3,837.0 2,711.1   <span class=\"ls0\">Last mile connect<span class=\"_ _2\"></span>ion<span class=\"_ _e\"></span> </span>5.1 4.3   <span class=\"ls0\">Other revenue </span>11.6 9.3 Net income (expense) from settle<span class=\"_ _2\"></span>ment mechanism<span class=\"_ _e\"></span> 237.7 173.3 Other income 259.6 135.1   <span class=\"ls0\">Services and techn<span class=\"_ _2\"></span>ical expertise<span class=\"_ _e\"></span> </span>(0.8) (2.2)   <span class=\"ls0\">Own production </span>107.0 82.1   <span class=\"ls0\">Optimal use of a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> </span>16.2 15.8   <span class=\"ls0\">Other </span>136.6 37.8   <span class=\"ls0\">Gain on sale PPE </span>0.7 1.5 We refer<span class=\"_ _2\"></span> to the segment reports for a detailed analysis of the g<span class=\"ff42\">roup\u2019s recognised revenues at segment level. The El<span class=\"_ _e\"></span>ia Tran<span class=\"_ _2\"></span>smission </span>(Belgium) segment r<span class=\"_ _2\"></span>eported revenues and othe<span class=\"_ _e\"></span>r income <span class=\"ff42\">of \u20ac</span>1,561.3 million (Note 4.2), the 50Hertz Transmission (Germany) segment repor<span class=\"_ _2\"></span>ted revenues and other income <span class=\"ff42\">of \u20ac</span>2,5<span class=\"_ _e\"></span>92.6 million (Note <span class=\"ff42\">4.3) and the \u2018Non</span>-<span class=\"ff42\">regulated activities and Nemo Link\u2019 segmen<span class=\"_ _2\"></span>t reported </span>revenues and other income <span class=\"ff42\">of \u20ac44.7</span> million (Note 4.4). The total reported revenues and other income <span class=\"ff42\">amount to \u20ac</span>4,<span class=\"_ _e\"></span>113.3 million. No further g<span class=\"_ _2\"></span>eographical information is provided as revenu<span class=\"_ _e\"></span>es are generated in the countries where the gr<span class=\"_ _2\"></span>id infrastructure is located, which large<span class=\"_ _2\"></span>ly corresponds to the segments mentioned ab<span class=\"_ _e\"></span>ove.<span class=\"_ _e\"></span> The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s own production relates to time <span class=\"ff3f\">sp<span class=\"_ _e\"></span>ent on investment projects by group employees. </span></span>The group<span class=\"_ _2\"></span> recognised \u20ac8.3 mil<span class=\"ff3f\">l<span class=\"_ _e\"></span>ion of revenue in the reporting per<span class=\"_ _2\"></span>iod that was included in the contract liability balance at the beginning of </span>the period (\u20ac1<span class=\"ff3f ls5b\">40<span class=\"ls0\">.5 million). Additional information is provided in Note 6.16. The group did not recognise any substantial revenues in the </span></span>repor<span class=\"_ _2\"></span>ting period with respect to performance obligations in previous periods. <span class=\"_ _e\"></span> 5.2. <span class=\"_ _87\"> </span>Operating expenses COST <span class=\"_ _e\"></span>OF<span class=\"_ _2\"></span> MATERIALS, SERVICES AND OTHER GOODS (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Raw mater<span class=\"_ _2\"></span>ials, consumables and goods for resale<span class=\"_ _e\"></span> 69.7 83.1 Purchase o<span class=\"_ _2\"></span>f ancillary services<span class=\"_ _e\"></span> 2,142.4 1,067.7 Services and<span class=\"_ _2\"></span> other goods (excl. purchase of ancillary services)<span class=\"_ _e\"></span> 412.3 375.9 Total 2,624.4 1,526.7 The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s costs for \u2018Raw materials, consumables and goods for resale\u2019 decr<span class=\"_ _e\"></span>eased to \u20ac69.7 million for the financial year 2022<span class=\"ff3f\">. In 2022, </span></span>the costs are a<span class=\"_ _2\"></span>ttributable to the Belgian segment for \u20ac5.0 million (\u20ac5.2 million in 2021), the German segment for \u20ac64.2 million <span class=\"_ _e\"></span>(\u20ac7<span class=\"ff3f\">2.0 </span>million in 20<span class=\"_ _2\"></span>21) and EGI for \u20ac0.5 million (\u20ac5.9 million in 2021).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Purchase o<span class=\"_ _2\"></span>f ancillary services\u2019 includes the costs for services which enable the <span class=\"ff3f\">group to balance generation with de<span class=\"_ _e\"></span>mand, maintain </span>constant <span class=\"_ _2\"></span>voltage levels and manage congestio<span class=\"ls5b\">n <span class=\"_ _e\"></span></span>across its grids. The cost incurred in 2022 by Elia Transmission (B<span class=\"_ _e\"></span>elgium) increased to \u20ac<span class=\"ff3f\">566.8<span class=\"_ _2\"></span> million (up <span class=\"ff42\">from \u20ac</span>294.0 million in 2021<span class=\"ls57\">) </span>mainly because of increased prices to cover electricity losses and increased activation<span class=\"_ _2\"></span>s </span>to balan<span class=\"_ _2\"></span>ce the grid against a background of the high en<span class=\"_ _e\"></span>ergy prices<span class=\"ls1d\">. </span>50Hertz Transmission (Germany) incurred incr<span class=\"_ _e\"></span>eased cost<span class=\"_ _2\"></span>s of \u20ac1,575<span class=\"_ _2\"></span>.6<span class=\"ff3f\"> million in 2022 </span>compared to \u20ac<span class=\"_ _e\"></span><span class=\"ff3f\">773.1 million in 2021 also due to higher electricity prices.  </span>\u2018<span class=\"ff3f\">Services and other </span>goods\u2019 relates to maintenance of the<span class=\"_ _2\"></span> g<span class=\"ff3f\">rid, services provided by third parties, insurance and consultancy fees<span class=\"_ _e\"></span>, and </span>others.<span class=\"_ _2\"></span> The cost of these incre<span class=\"ff42\">ased by \u20ac36.4</span> million (<span class=\"_ _e\"></span>+9.6%) <span class=\"ff42\">to \u20ac</span><span class=\"ls5b\">412</span>.3 million. The <span class=\"ls1c\">in</span>crease is mainly explained by the increased level of activities in an infla<span class=\"_ _2\"></span>tionary environment. <span class=\"_ _e\"></span> PERSONN<span class=\"_ _e\"></span>EL EXPENSES<span class=\"_ _2\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Salaries and<span class=\"_ _2\"></span> wages<span class=\"_ _e\"></span> 274.6 242.2 Social security co<span class=\"_ _2\"></span>ntributions<span class=\"_ _e\"></span> 56.6 50.8 Pension costs 29.6 22.6 Other personnel e<span class=\"_ _2\"></span>xpenses<span class=\"_ _e\"></span> 5.8 5.9 Share-based payments expenses 2.0 0.2 Employee b<span class=\"_ _2\"></span>enefits (excl. pensions) 3.6 12.4 Total 372.1 334.1 Personnel e<span class=\"_ _2\"></span>xpenses <span class=\"ff42\">increased by \u20ac38 million in 2022 as <span class=\"_ _e\"></span></span>a consequence of the indexation and the continued growth in headcount<span class=\"ls1d\">, </span>especially in the no<span class=\"_ _2\"></span>n-regulated segment. For Elia <span class=\"_ _e\"></span>Transmission (Belgium) the personnel expenses <span class=\"ff42\">amounted to \u20ac1</span><span class=\"ls78\">83</span>.5 in 2<span class=\"_ _2\"></span>022 compared to<span class=\"_ _2\"></span> <span class=\"ff42 ls5b\">\u20ac16</span>6<span class=\"_ _e\"></span>.5 million in 2021<span class=\"ls1d\">. </span>50Hertz Transmissio<span class=\"_ _e\"></span>n (Germany) accou<span class=\"ff42\">nted for \u20ac168.1 </span>million of the g<span class=\"ff42\">roup\u2019s personnel expenses </span>for 2021 (previou<span class=\"_ _2\"></span>s year: \u20ac1<span class=\"ff3f ls78\">51<span class=\"ls0\">.4 m<span class=\"_ _2\"></span>illion) and the non-<span class=\"ff42\">regulated activities and Nemo Link accounted for \u20ac</span><span class=\"ls5b\">20<span class=\"_ _e\"></span></span>.5 million (previous year: </span></span>\u20ac1<span class=\"ff3f ls0\">6.2 million). All three segments have experienced a growth in the number of full-time equivalents to support the acceleration of the </span>energ<span class=\"_ _2\"></span>y transition and the development opportunities linke<span class=\"_ _e\"></span>d to the expansion o<span class=\"_ _2\"></span>f its international offshore activities<span class=\"_ _e\"></span>. A new capital increase<span class=\"_ _2\"></span> in favour of the members of the pe<span class=\"_ _e\"></span>rsonnel of Elia Group NV/SA and its Belgian subsidiaries <span class=\"_ _e\"></span>was completed in December <span class=\"ls5b\">202</span>2. The capital increase resulted in the creation of <span class=\"ls78\">47</span>,<span class=\"ls5b\">920</span> additional shares without nominal va<span class=\"_ _2\"></span>lue. T<span class=\"_ _e\"></span>he group's employees were grante<span class=\"_ _2\"></span>d a 16.66% reduction on the quoted share <span class=\"_ _e\"></span>price, which resulted in <span class=\"ff42\">a \u20ac1.7 million</span> reduction overall. See Note 6.13 <span class=\"ff42\">\u2018Employee benefits\u2019</span> for more information about p<span class=\"_ _2\"></span>ension costs and employee benefits<span class=\"ff42 ls1c\">\u2019.<span class=\"_ _e\"></span></span><span class=\"fc1d\"> </span>DEPRECIATI<span class=\"_ _e\"></span>ON, AM<span class=\"_ _2\"></span>ORTISATION, IMPAIRMENT AND CHA<span class=\"_ _2\"></span>NGES IN <span class=\"_ _e\"></span>PROVISIONS (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Amortisation<span class=\"_ _2\"></span> of intangible assets<span class=\"_ _e\"></span> 30.2 24.5 Depreciation of prop<span class=\"_ _2\"></span>erty, plant and equipment<span class=\"_ _e\"></span> 483.6 443.1 Total depreciation and a<span class=\"_ _2\"></span>mortisation<span class=\"_ _e\"></span> 513.7 467.5 Impairment of inven<span class=\"_ _2\"></span>tories<span class=\"_ _e\"></span> 0.0 0.6 Total impairment 0.0 0.6 Provisions for<span class=\"_ _2\"></span> litigations<span class=\"_ _e\"></span> (1.5) (0.5) Environmental provisions 0.3 (0.2) Other provision<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> (0.0) 0.0 Changes in p<span class=\"_ _2\"></span>rovisions<span class=\"_ _e\"></span> (1.3) (0.8) Depreciat<span class=\"_ _2\"></span>ion, amortisation, impairment and changes in provisions<span class=\"_ _e\"></span> 512.4 467.4 The total \u2018depreciation, amortisa<span class=\"_ _2\"></span>tion, impairment and changes in provisions\u2019 increased from \u20ac467.4 <span class=\"_ _e\"></span>million in 2021 to \u20ac512.4 million in 2022<span class=\"ls0\">, mainly because of an increase in depreciation of property, plant and equipment due to increasing fixed assets.<span class=\"_ _e\"></span> </span>A detailed descriptio<span class=\"_ _2\"></span>n and movement schedule i<span class=\"_ _e\"></span>s provided in other sections for 'Intangible assets' (see Note 6.2), 'Property, plant and equipment' (see<span class=\"_ _2\"></span> Note 6.1) and 'Provisions' (see Note <span class=\"_ _e\"></span>6.15<span class=\"ls8f\">).</span> OTHER EXPEN<span class=\"_ _e\"></span>SES (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Taxes o<span class=\"_ _2\"></span>ther than income tax<span class=\"_ _e\"></span> 15.4 14.0 Loss on d<span class=\"_ _2\"></span>isposal/sale of property, plant and equipment<span class=\"_ _e\"></span> 17.8 19.1 Impairment on re<span class=\"_ _2\"></span>ceivables<span class=\"_ _e\"></span> 1.2 0.5 Other 10.0 7.7 Total 44.4 41.4 In 2022, the<span class=\"_ _2\"></span> share of Elia Transmission (Belgium) in the g<span class=\"_ _e\"></span><span class=\"ff42\">roup\u2019s other expen<span class=\"_ _2\"></span>ses was \u20ac2<span class=\"_ _e\"></span><span class=\"ff3f\">6.6 </span>million (\u20ac2<span class=\"ff3f\">1.6 million in 2021), 50Hertz </span></span>Transmission (<span class=\"_ _2\"></span>Germany)\u2019s total share amounted to \u20ac1<span class=\"ff3f\">7.<span class=\"_ _e\"></span>0 </span>million (\u20ac<span class=\"ff3f ls78\">19<span class=\"ls0\">.<span class=\"_ _2\"></span>7 million in 2021) and the share of the non-re<span class=\"_ _e\"></span>gulated activities and </span></span>Nemo Link <span class=\"_ _2\"></span>segment accounted for \u20ac0.<span class=\"ff3f\">9 <span class=\"_ _e\"></span></span>million (\u20ac0.<span class=\"ff3f\">1 million in 2021<span class=\"ls8f\">).</span> </span>Taxes o<span class=\"_ _2\"></span>ther than income tax mainly consist of property ta<span class=\"_ _e\"></span>xes.  Losses on<span class=\"_ _2\"></span> disposal for property, plant and equipment totalled \u20ac<span class=\"ff3f ls5b\">12<span class=\"ls0\">.8<span class=\"_ _e\"></span> </span></span>million for Elia Transmission (Belgium), compared with \u20ac<span class=\"_ _2\"></span>9.<span class=\"_ _e\"></span><span class=\"ff3f\">0 million </span>in <span class=\"ff42\">the previous <span class=\"_ _2\"></span>year. 50Hertz Transmission (Germany) recorded \u20ac<span class=\"ff3f\">5.0 million of losses on disposal for prope<span class=\"_ _e\"></span>rty, plant and equipment in<span class=\"_ _2\"></span> </span></span>2021<span class=\"ff42 ls0\">, from \u20ac1<span class=\"ff3f\">0.1 million in 202</span></span>1.<span class=\"_ _e\"></span><span class=\"ls0\"> </span>The amoun<span class=\"_ _2\"></span>t of impairment on trade receivables is explained in Note 8.1 \u2018Financial risk and derivative management\u2019.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>5.3. <span class=\"_ _87\"> </span>Net finance costs (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Finance inco<span class=\"_ _2\"></span>me 75.4 3.9 Intere<span class=\"_ _2\"></span>st income on cash and cash equivalents and granted loans<span class=\"_ _e\"></span> 4.2 1.1 Other f<span class=\"_ _2\"></span>inancial income<span class=\"_ _e\"></span> 71.2 2.8 Finance costs (119.0) (110.5) Intere<span class=\"_ _2\"></span>st expense on eurobonds and other bank borrowings<span class=\"_ _e\"></span> (112.0) (110.4) Intere<span class=\"_ _2\"></span>st expense on derivatives<span class=\"_ _e\"></span> (0.6) (0.6) Intere<span class=\"_ _2\"></span>st cost on leasing (1.3) (1.8) Other f<span class=\"_ _2\"></span>inancial costs (5.1) 2.3 Net finance costs (43.6) (106.6) Finance<span class=\"_ _2\"></span> income <span class=\"ff42\">increased from \u20ac3</span>.9 million in 2021 <span class=\"ff42\">to <span class=\"_ _e\"></span>\u20ac</span><span class=\"ls78\">75</span>.4<span class=\"_ _2\"></span> million in 2022<span class=\"ff42\">. 50Hertz Transmission (Germany)\u2019s contri</span>bution explains the var<span class=\"_ _2\"></span>iation with \u20ac73.9 million in 2022 compared<span class=\"ff3f\"> </span>t<span class=\"_ _e\"></span>o \u20ac2.1 million<span class=\"ff3f\"> in 2021. This variation is primarily driven by the re<span class=\"_ _e\"></span>valuation of provision </span>for congestion<span class=\"_ _2\"></span> income from interconnectors t<span class=\"_ _e\"></span>o be returned to grid customers based on an upwards re<span class=\"_ _2\"></span>vision of the i<span class=\"_ _e\"></span>nterest forward cur<span class=\"_ _2\"></span>ve.<span class=\"_ _e\"></span> The contribu<span class=\"_ _2\"></span>tion of Elia Transmission (Belgium) <span class=\"ff42\">is cl<span class=\"_ _e\"></span>ose to previous year (\u20ac1.3 million in 2022 compared </span> <span class=\"ff42\">\u20ac1.7 million</span> in 2021). The <span class=\"ls5b\">non</span>-regulated act<span class=\"_ _2\"></span>ivities and Nemo Link segment sh<span class=\"_ _e\"></span>owed <span class=\"ff42\">\u20ac</span>3.8 million <span class=\"ff42\">of financial income (\u20ac0.1 million in 2021).</span> The interest expen<span class=\"_ _2\"></span>ses on Eurobonds and other bank borrowing<span class=\"_ _e\"></span>s <span class=\"ff42\">increased by \u20ac1.6</span> million compared to the previous year. See Note 6.12 for more d<span class=\"_ _2\"></span>etails regarding the loans outstanding and the interest paid in 2022.<span class=\"_ _e\"></span> The interest cost on<span class=\"_ _2\"></span> leasing slightly decreased in comparison with the previous year. This is <span class=\"_ _e\"></span>explained by the lower value of financial lease liabilities. Other f<span class=\"_ _2\"></span>inancial costs decreased from -<span class=\"ff42\">\u20ac2.3</span> million <span class=\"ff42\">in 202<span class=\"_ _e\"></span>1 to \u20ac5.1 million in 2022</span><span class=\"ls1d\">. </span>In 2021, a net interest on German<span class=\"_ _e\"></span> regulatory issues (credit <span class=\"_ _2\"></span>amount of \u20ac6.5 million) was reported in this captio<span class=\"_ _e\"></span><span class=\"ff3f\">n in connection with the revenue for congestion management. As explained </span>here above, <span class=\"_ _2\"></span>in 2022, the financial income is reported in \u2018Other financial income\u2019.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Please see Note 6.13 for more deta<span class=\"_ _2\"></span>ils <span class=\"_ _e\"></span><span class=\"ls5b\">about</span> net <span class=\"_ _e\"></span>debt and loans. 5.4. <span class=\"_ _87\"> </span>Income taxes RECOGNISED IN PROFIT OR LOSS The consolidated income sta<span class=\"_ _2\"></span>tement includes the following taxes:<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Curren<span class=\"_ _2\"></span>t year 112.8 98.8 Adjustments for prior y<span class=\"_ _2\"></span>ears<span class=\"_ _e\"></span> (0.7) (4.1) Total cu<span class=\"_ _2\"></span>rrent income tax expenses<span class=\"_ _e\"></span> 112.1 94.7 Origination from an<span class=\"_ _2\"></span>d reversal of temporary differences<span class=\"_ _e\"></span> 35.4 10.5 Total deferred t<span class=\"_ _2\"></span>axes expenses<span class=\"_ _e\"></span> 35.4 10.5 Total in<span class=\"_ _2\"></span>come taxes and deferred taxes recognised in profit and loss<span class=\"_ _e\"></span> 147.5 105.2 Total income t<span class=\"_ _2\"></span>ax expenses 2022 were higher than in 2021. The i<span class=\"_ _e\"></span>ncrease is mainly explained by the higher profit generated both in Belgium and<span class=\"_ _2\"></span> Germany.<span class=\"_ _e\"></span> Deferred income taxe<span class=\"_ _2\"></span>s are discussed further in Note <span class=\"ls5b\">6.<span class=\"_ _e\"></span></span>7. RECONCILI<span class=\"_ _e\"></span>A<span class=\"_ _2\"></span>TION OF THE EFFECTIVE TAX RATE The ta<span class=\"_ _2\"></span>x on the Group's profit (loss) before tax differs from <span class=\"_ _e\"></span>the theoretical amount that would arise using the Belgian statutory tax rate applicable to profits (lo<span class=\"_ _2\"></span>sses) of the consolidated companies:<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Profit before income t<span class=\"_ _2\"></span>ax 555.7 433.5 Domestic corpor<span class=\"_ _2\"></span>ate income tax 25%<span class=\"ls0\"> </span>25%<span class=\"ls0\"> </span>Income <span class=\"_ _2\"></span>tax, using the domestic corporate tax rate<span class=\"_ _e\"></span> (138.9) (108.4) Effect of th<span class=\"_ _2\"></span>e foreign tax rate (17.5) (11.6) Share of profit<span class=\"_ _2\"></span> of equity accounted investees, net of tax<span class=\"_ _e\"></span> 10.0 12.3 Non-deductible e<span class=\"_ _2\"></span>xpenses (11.0) (10.6) Adjustments for prior y<span class=\"_ _2\"></span>ears<span class=\"_ _e\"></span> 0.8 4.4 Tax credits an<span class=\"_ _2\"></span>d other tax reductions<span class=\"_ _e\"></span> 7.3 5.6 Effect of unrecognized deferred<span class=\"_ _2\"></span> tax assets on tax loss carry-forwards<span class=\"_ _e\"></span> (4.6) (1.9) Tax on<span class=\"_ _2\"></span> hybrid securities 4.8 4.8 Corporate interest restr<span class=\"_ _2\"></span>iction<span class=\"_ _e\"></span> 0.0 0.0 Other 1.6 0.1 Total in<span class=\"_ _2\"></span>come taxes and deferr<span class=\"_ _e\"></span>ed taxes recognised in profit<span class=\"_ _2\"></span> and loss<span class=\"_ _e\"></span> (147.5) (105.2) * The income tax rate<span class=\"_ _2\"></span> in Germany amounts to 29.93% in 2022 and 29.72% in 2021<span class=\"_ _e\"></span> The e<span class=\"_ _2\"></span>ffective tax rate 2022 of the Group is 26.54%, compared to 24.27% in 2021. This increase is mainly <span class=\"_ _e\"></span>explained by<span class=\"fs11 fc1e\"> <span class=\"_ _e\"></span></span>the high<span class=\"_ _2\"></span>er contribu<span class=\"_ _2\"></span>tion of the German segment to the profit befo<span class=\"_ _e\"></span>re tax at an h<span class=\"_ _2\"></span>igher local tax rate. 5.5. <span class=\"_ _87\"> </span>Earnings per share (EPS) BASIC <span class=\"_ _e\"></span>EPS Basic earning<span class=\"_ _2\"></span>s per share are calculated by dividing the net profit attributable to the <span class=\"_ _e\"></span><span class=\"ff42\">Company\u2019s </span>shareholders (after <span class=\"_ _e\"></span>adjustment for the<span class=\"_ _2\"></span> distribution on h<span class=\"_ _2\"></span>ybrid securities<span class=\"ls57\">) <span class=\"ff42 ls8f\">(\u20ac</span></span>341.7 million) by the weighted average number of ordinary shares outstanding during the year.<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Profit att<span class=\"_ _2\"></span>ributable to equity holders of ordinary shares<span class=\"_ _e\"></span> 341.7 276.0 Effect of dilutive<span class=\"_ _2\"></span> potential ordinary shares<span class=\"_ _e\"></span> 0 0 Earnings for the purpo<span class=\"_ _2\"></span>ses of diluted earnings per share<span class=\"_ _e\"></span> 341.7 276<span class=\"ls0\"> </span>Ordinar<span class=\"_ _2\"></span>y shares issued on 1 January<span class=\"_ _e\"></span> 68,728<span class=\"_ _2\"></span>,055 68,720<span class=\"_ _2\"></span>,695<span class=\"_ _e\"></span> Treasury shares a<span class=\"_ _2\"></span>s at 1 January<span class=\"_ _e\"></span> -7,248 0 Ordinar<span class=\"_ _2\"></span>y shares issued in March 2021<span class=\"_ _e\"></span> 7,360 Ordinar<span class=\"_ _2\"></span>y shares issued in June 2022 4,739,864 Ordinar<span class=\"_ _2\"></span>y shares issued in December 2022<span class=\"_ _e\"></span> 47,920 Treasury shares - net movement for the year -6,232 -7,248 Outstanding ord<span class=\"_ _2\"></span>inary shares as at 31 December<span class=\"_ _e\"></span> 73,502<span class=\"_ _2\"></span>,359 68,720<span class=\"_ _2\"></span>,807<span class=\"_ _e\"></span> Weighted average<span class=\"_ _2\"></span> of outstanding ordinary shares (basic)<span class=\"_ _e\"></span> 71,142<span class=\"_ _2\"></span>,846 68,722<span class=\"_ _2\"></span>,476<span class=\"_ _e\"></span> Effect of dilutive<span class=\"_ _2\"></span> potential ordinary shares<span class=\"_ _e\"></span> 0 0 Weighted average<span class=\"_ _2\"></span> number of <span class=\"_ _e\"></span>outstanding o<span class=\"_ _2\"></span>rdinary sh<span class=\"_ _e\"></span>ares (diluted) 71,142<span class=\"_ _2\"></span>,846 68,722<span class=\"_ _2\"></span>,476<span class=\"_ _e\"></span> Basic ea<span class=\"_ _2\"></span>rnings per share (in \u20ac)<span class=\"ff40\"> </span>4.80 4.02 Diluted earn<span class=\"_ _2\"></span>ings per share (in \u20ac)<span class=\"ff40\"> </span>4.80 4.02 DILUTED EPS Diluted earnings <span class=\"_ _2\"></span>per share are determined by adjusting the profit or loss attributable to ordinary shareholders and t<span class=\"_ _e\"></span>he weighted average number of ordinary shares outstan<span class=\"_ _2\"></span>ding for the effects of all dilutive potential ordinary shares, which comprise share options<span class=\"_ _e\"></span> and convertib<span class=\"_ _2\"></span>le bonds.<span class=\"_ _e\"></span> Diluted earnings <span class=\"_ _2\"></span>per share are equal to basic e<span class=\"_ _e\"></span>arnings per share, since there<span class=\"_ _2\"></span> are no share options or convertible b<span class=\"_ _e\"></span>onds. 5.6. <span class=\"_ _87\"> </span>Other co<span class=\"_ _e\"></span>mprehensive income Total comprehensive<span class=\"_ _2\"></span> income includes both the result of the period recognised in the statement of profit or loss and other compr<span class=\"_ _e\"></span>ehensive income recogn<span class=\"_ _2\"></span>ised in equity. <span class=\"ff42\">\u2018</span>Other comprehensive inco<span class=\"_ _e\"></span>me<span class=\"ff42\">\u2019</span> includes all changes in equity other than owner-relate<span class=\"_ _e\"></span>d changes, which are repor<span class=\"_ _2\"></span>ted in the statement of changes in equity.<span class=\"_ _e\"></span> The total other comprehensive income for 2022 amounts <span class=\"_ _e\"></span>to <span class=\"ff42\">\u20ac</span>65.6 million ne<span class=\"_ _e\"></span>gative impact, representing a significan<span class=\"_ _e\"></span>t <span class=\"ls5b\">de</span>cr<span class=\"_ _e\"></span>ease compared with the previ<span class=\"ff42\">ous <span class=\"_ _2\"></span>year (\u20ac<span class=\"ff3f\">270.8 million <span class=\"_ _e\"></span>positive impact). The most important drivers of this are described below. </span></span>Cash flow he<span class=\"_ _2\"></span>dges<span class=\"_ _e\"></span> Since 2021, 50Her<span class=\"_ _2\"></span>tz applies hedge accounting for the purpose of reducing the risk of fluctuations in the expected a<span class=\"_ _e\"></span>mount of grid losses. Due to the dr<span class=\"_ _2\"></span>op in energy prices in the last quarter of the year, the fair value of these contracts decreased from \u20ac355<span class=\"_ _e\"></span><span class=\"ff3f\">.6 million in 2021 to </span>\u20ac129.6<span class=\"_ _2\"></span> million end of 2022, or a decrease of \u20ac226 million (pre<span class=\"ff3f\">-tax). <span class=\"_ _e\"></span>This impact has been partly offset by the positive value a<span class=\"_ _2\"></span>ccounted </span>for in Belgium in co<span class=\"_ _2\"></span>nnection with the pre<span class=\"_ _e\"></span>-hedging of probable forecast debt transactions (bonds issuance). The fair value of these derivatives amounted<span class=\"_ _2\"></span> to \u20ac65.3 million<span class=\"ff3f\"> (pr<span class=\"_ _e\"></span>e-tax). </span>The related<span class=\"_ _2\"></span> tax on these elements amounts to +<span class=\"_ _e\"></span><span class=\"ff42\">\u20ac</span><span class=\"ls5b\">50</span>.4 million. Financial a<span class=\"_ _2\"></span>ssets measured at fair value through other comprehensive income<span class=\"_ _e\"></span> The measureme<span class=\"_ _2\"></span>nt at fair value of the pa<span class=\"_ _e\"></span>rticipation of EEX, in which 50<span class=\"_ _2\"></span>Hertz Transmission holds a 5.4%<span class=\"_ _e\"></span> stake <span class=\"ff42\">resulted in a gain of \u20ac3</span>2,7 million as of 31 December 2022. <span class=\"ff42\">The fair value e<span class=\"_ _2\"></span>volved fr<span class=\"_ _e\"></span>om \u20ac42,7 million end of 2021 to \u20ac75.9<span class=\"_ _2\"></span> million end of 2022.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>Re<span class=\"_ _e\"></span>me<span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>su<span class=\"_ _e\"></span>re<span class=\"_ _e\"></span>me<span class=\"_ _e\"></span>n<span class=\"_ _e\"></span>ts<span class=\"_ _20\"></span> of<span class=\"_ _e\"></span> p<span class=\"_ _e\"></span>o<span class=\"_ _e\"></span>st-<span class=\"_ _e\"></span>e<span class=\"_ _e\"></span>mp<span class=\"_ _e\"></span>lo<span class=\"_ _e\"></span>y<span class=\"_ _e\"></span>me<span class=\"_ _e\"></span>nt<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>be<span class=\"_ _e\"></span>ne<span class=\"_ _e\"></span>fi<span class=\"_ _e\"></span>t <span class=\"_ _e\"></span>o<span class=\"_ _e\"></span>bli<span class=\"_ _e\"></span>g<span class=\"_ _e\"></span>at<span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>ons<span class=\"_ _20\"></span><span class=\"ff40\"> </span>The o<span class=\"_ _2\"></span>ther comprehensive income on post-<span class=\"_ _e\"></span>employment obligations had a positive impact amounting to <span class=\"ff42\">\u20ac</span><span class=\"ls5b\">16</span>.3 <span class=\"_ _e\"></span>million. This impact is mainly expla<span class=\"_ _2\"></span>ined by the increase <span class=\"lsa7\">in</span> <span class=\"_ _2\"></span>the discount rate, partly offset by the negative return of the plan assets. See No<span class=\"_ _e\"></span>te 6<span class=\"ls1d\">.1</span>3 for more details.  The related<span class=\"_ _2\"></span> tax on these elements amounts to -<span class=\"ff42\">\u20ac</span>4.9 <span class=\"_ _e\"></span>million. 6.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Items in the consolidated statem<span class=\"_ _2\"></span>ent of financial position</span>6.1. <span class=\"_ _87\"> </span>Property, plant and equipment (in \u20ac million)<span class=\"ff40\"> </span>Leasing Machinery Furniture Other Assets Land and and and and tangible<span class=\"_ _2\"></span> under Total buildings similar equipment vehic<span class=\"_ _2\"></span>les<span class=\"_ _e\"></span> assets construct<span class=\"_ _2\"></span>ion rights ACQUISITION VALUE Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> 430.8 11,179<span class=\"_ _2\"></span>.4<span class=\"_ _e\"></span> 343.8 31.5 117.0 1,713.0 13,815<span class=\"_ _2\"></span>.6<span class=\"_ _e\"></span> Additions 10.6 179.8 36.0 0.9 49.6 956.0 1,232.8 Disposals (3.3) (87.1) (42.6) (0.2) (0.4) 0.0 (133.6) Transfers 27.6 503.0 35.1 2.9 0.0 (570.1) (1.5) Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021<span class=\"ls0\"> </span>465.8 11,775<span class=\"_ _2\"></span>.0<span class=\"_ _e\"></span> 372.3 35.1 166.1 2,098.8 14,913<span class=\"_ _2\"></span>.2<span class=\"_ _e\"></span> Balance at 1 Janua<span class=\"_ _2\"></span>ry 2022<span class=\"_ _e\"></span> 465.8 11,775<span class=\"_ _2\"></span>.0<span class=\"_ _e\"></span> 372.3 35.1 166.1 2,098.8 14,913<span class=\"_ _2\"></span>.2<span class=\"_ _e\"></span> Additions 9.3 334.0 34.7 0.1 (15.6) 1,130.1 1,492.6 Disposals (1.8) (82.6) (8.4) 0.0 0.5 (0.7) (93.0) Transfers 3.6 718.9 105.6 11.1 0.0 (838.0) 1.1 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022<span class=\"ls0\"> </span>476.8 12,745<span class=\"_ _2\"></span>.3<span class=\"_ _e\"></span> 504.2 46.4 151.0 2,390.1 16,313<span class=\"_ _2\"></span>.8<span class=\"_ _e\"></span> ACCUMULATED DEPRECIATION AND IMPAIRMENT Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> (36.1) (3,416.0) (205.7) (29.2) (34.2) 0.0 (3,721.2) Depreciation (6.6) (381.5) (39.7) (1.1) (14.8) (443.6) Disposals 2.2 68.6 39.7 0.1 0.4 111.<span class=\"ls0\">1 </span>Transfers 0.0 2.3 0.0 (2.3) 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021<span class=\"ls0\"> </span>(40.5) (3,726.6) (205.7) (32.4) (48.6) 0.0 (4,053.7) Balance at 1 Janua<span class=\"_ _2\"></span>ry 2022<span class=\"_ _e\"></span> (40.5) (3,726.6) (205.7) (32.4) (48.6) 0.0 (4,053.7) Depreciation (6.2) (404.1) (59.1) (0.6) (13.5) (483.6) Disposals 1.2 59.4 8.1 0.0 (0.5) 68.2 Transfers 0.0 11.0 0.0 (11.0) 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022<span class=\"ls0\"> </span>(45.5) (4,060.3) (256.7) (44.0) (62.5) 0.0 (4,469.1) CARRYING AMOUNT Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 394.7 7,763.4 138.1 2.3 82.8 1,713.1 10,094<span class=\"_ _2\"></span>.4<span class=\"_ _e\"></span> Balance at 31 December<span class=\"_ _2\"></span> 2021 425.3 8,048.4 166.6 2.8 117.5 2,098.9 10,859<span class=\"_ _2\"></span>.5<span class=\"_ _e\"></span> Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 425.3 8,048.4 166.6 2.8 117.5 2,098.9 10,859<span class=\"_ _2\"></span>.5<span class=\"_ _e\"></span> Balance at 31 December<span class=\"_ _2\"></span> 2022 431.4 8,684.9 247.4 2.3 88.5 2,390.1 11,844<span class=\"_ _2\"></span>.7<span class=\"_ _e\"></span> Large-scale (onshore and o<span class=\"_ _2\"></span>ffshore) infrastructure projects<span class=\"_ _e\"></span> in both Belgium and Germany are underway. These<span class=\"_ _2\"></span> projects are focusing on<span class=\"_ _e\"></span> strengthening both<span class=\"_ _2\"></span> the Belgian and German grids, d<span class=\"_ _e\"></span>eveloping the necessary offshore infrastructures to allow the integration of increasing<span class=\"_ _2\"></span> amounts of renewable energy into the grid and the digitalization of the infrastructure. The acceleration of<span class=\"_ _e\"></span> the energy transition and the current in<span class=\"_ _2\"></span>flationary environment are driving the investments of the Group.<span class=\"_ _e\"></span> In Belgium, <span class=\"_ _2\"></span>Elia Transmissi<span class=\"ff42\">on made investments totalling <span class=\"_ _e\"></span>\u20ac403.2 million in property, p<span class=\"_ _2\"></span>lant and equipment. In 2022, <span class=\"_ _e\"></span>159 replacement </span>projects o<span class=\"_ _2\"></span>ccurred across the Belgian grid, amounting to a total investment of \u20ac113.4 million. Around \u20ac60 million was invested<span class=\"ff3f\"> in </span>suppor<span class=\"_ _2\"></span>ting the digitalisation of our infrastructure and the d<span class=\"_ _e\"></span>evelopment of new tools. The reinforcement <span class=\"_ _2\"></span>works betwe<span class=\"_ _e\"></span>en Avelgem and Avelin, which forms pa<span class=\"_ _2\"></span>rt of the 380 kV backbone between Mercator and France, had been successfully finalised by the end of th<span class=\"_ _e\"></span>e year. Construction wor<span class=\"ff42\">ks continued along the Massenhoven Van Eyck Corridor (\u20ac32.7 million) and the Mercato<span class=\"_ _2\"></span>r Bruegel <span class=\"_ _e\"></span>Corridor (\u20ac33.9 </span>million). An im<span class=\"_ _2\"></span>portant milestone was reached with the commissioning of a new 380 kV GIS substation, two 380 kV phase shifters a<span class=\"_ _e\"></span>nd a 380 kV compens<span class=\"ff42\">ator in Zand<span class=\"_ _2\"></span>vliet (\u20ac12.1 million). In Q3<span class=\"ff3f\">-20<span class=\"_ _e\"></span>22, work began in Rimi\u00e8re on the construction of a new 380 kV subst<span class=\"_ _2\"></span>ation and </span></span>the extension o<span class=\"_ _2\"></span>f the existing 220 kV substation (\u20ac11.9 mill<span class=\"_ _e\"></span>ion); th<span class=\"_ _2\"></span>is project aims to create the required hosting capacity fo<span class=\"_ _e\"></span><span class=\"ff3f\">r the new CRM </span>power p<span class=\"_ _2\"></span>lants in Les Awirs &amp; Seraing by 2025.<span class=\"_ _e\"></span> In Germany, 50Hertz<span class=\"_ _2\"></span> Transmission invested \u20ac<span class=\"ff3f\">1,0<span class=\"_ _e\"></span>89.3 million in proper<span class=\"_ _2\"></span>ty, plant and equipment. The most significant onshore investment </span>is <span class=\"ff42\">the DC line SuedOstLink <span class=\"_ _2\"></span>(\u20ac210.0 million). It plays an important role <span class=\"ff3f\">in connecting the growing (offshore) production in the north of </span></span>German<span class=\"_ _2\"></span>y with the consumption centres in the South. In or<span class=\"_ _e\"></span>der to reinforce the existin<span class=\"_ _2\"></span>g grid, the upgrading of high<span class=\"_ _e\"></span>-vol<span class=\"_ _e\"></span>tage pylons to boost opera<span class=\"_ _2\"></span>tional safety was accelerated in 2022 (\u20ac54.7<span class=\"ff3f\"> million<span class=\"_ _e\"></span>). Another important milestone was reached for the replacement of the old </span>Uckermar<span class=\"_ _2\"></span>k line with the successful settlement of a lawsuit after 17 years. The investment for this reinforcement consists of <span class=\"_ _e\"></span>the overhead line in the<span class=\"_ _2\"></span> southern Uckermark region (\u20ac5<span class=\"ff3f\">3.1 <span class=\"_ _e\"></span></span>million) and the overhead line in the northern Uckermar<span class=\"_ _2\"></span>k region (\u20ac46.9<span class=\"_ _e\"></span><span class=\"ff3f\"> million). Other </span>important on<span class=\"_ _2\"></span>shore projects to strengthen our onshore grid<span class=\"_ _e\"></span> are the re<span class=\"_ _2\"></span>structuring of the substation Lauchst\u00e4dt with S<span class=\"_ _e\"></span>TATCOM and MSCDN (\u20ac35.0<span class=\"_ _2\"></span> million) and the restructu<span class=\"_ _e\"></span>ring and reinforcement of the<span class=\"_ _2\"></span> overhead line between Wolmirstedt and G\u00fcs<span class=\"_ _e\"></span>trow (\u20ac34.6 million). Offshore investments mainly fo<span class=\"_ _2\"></span>cused on the Ostwind 2 project (\u20ac186.3 million), with the next offshore wind farm connection (O<span class=\"ff3f\">stwind <span class=\"_ _e\"></span>3) </span>already advan<span class=\"_ _2\"></span>cing along the <span class=\"ff42\">project pipeline (\u20ac82.5 million).<span class=\"_ _e\"></span></span> During 2022, \u20ac24.2<span class=\"_ _2\"></span> million of borrowing costs were capitalised on assets under construction. An amount of \u20ac6.1 million based <span class=\"_ _e\"></span><span class=\"ff3f\">on an </span>average interest rate o<span class=\"_ _2\"></span>f 1.91% originated <span class=\"ff42\">from th<span class=\"_ _e\"></span>e Elia Transmission Belg<span class=\"_ _2\"></span>ium segment (\u20ac7.8 <span class=\"_ _e\"></span><span class=\"ff3f\">million at 2.03% in 2021). An amount of </span></span>\u20ac18.1 million ba<span class=\"_ _2\"></span>sed on an average interest rate of 1.44% was accounted for in the 50Hertz Transmission segment (\u20ac13.5 million<span class=\"_ _e\"></span><span class=\"ff3f\"> at </span>0.98% in 2021). There were<span class=\"_ _2\"></span> no mortgages, pledges or similar securities on PP&amp;<span class=\"_ _e\"></span>E relating to loans. Outstand<span class=\"_ _2\"></span>ing capital expenditure commitments are describ<span class=\"_ _e\"></span>ed in Note 8.2. The analysis of lease liabilities is presented in note 6.19.<span class=\"_ _e\"></span> Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.2. <span class=\"_ _87\"> </span>Intangible assets (in \u20ac million)<span class=\"ff40\"> </span>Development<span class=\"_ _2\"></span> Licenses/ Other intangib<span class=\"_ _2\"></span>le Total costs of<span class=\"_ _2\"></span> softw<span class=\"_ _e\"></span>are concessions assets ACQUISITION VALUE Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> 209.0 29.6 0.0 238.5 Additions 61.5 4.9 0.0 66.4 Disposals (2.7) 0.0 0.0 (2.7) Transfers 0.6 0.0 0.9 1.5 Balance at 31 Dece<span class=\"_ _2\"></span>mber 2021 268.4 34.5 0.9 303.8 Balance at 1 Janua<span class=\"_ _2\"></span>ry 2022<span class=\"_ _e\"></span> 268.4 34.5 0.9 303.8 Additions 89.5 3.1 0.6 93.2 Disposals 0.0 0.0 0.0 0.0 Transfers (1.1) 0.0 0.0 (1.1) Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 356.8 37.6 1.6 395.9 ACCUMULATED DEPRECIATION AND IMPAIRMENT Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> (125.4) (7.8) 0.0 (133.1) Depreciation (21.4) (2.9) (0.2) (24.5) Disposals 2.5 (0.2) 0.0 2.4 Transfers 0.0 0.0 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 (144.2) (10.8) (0.2) (155.2) Balance at 1 January 2022 (144.2) (10.8) (0.2) (155.2) Depreciation (26.3) (3.5) (0.3) (30.2) Disposals 0.0 0.0 0.0 0.0 Transfers 0.0 0.0 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 (170.5) (14.4) (0.5) (185.4) CARRYING AMOUNT Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 83.6 21.8 0.0 105.<span class=\"ls0\">4 </span>Balance at 31 December<span class=\"_ _2\"></span> 2021 124.2 23.6 0.8 148.6 Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 124.2 23.6 0.8 148.6 Balance at 31 December<span class=\"_ _2\"></span> 2022 186.3 23.2 1.1 210.5 Software comprise<span class=\"_ _2\"></span>s both IT applications developed by the <span class=\"_ _e\"></span>Group for operating the grid and software for the Group's norma<span class=\"_ _2\"></span>l business opera<span class=\"_ _2\"></span>tions.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> invested a total amount of \u20ac93.2 million, of which \u20ac45.8 million in Elia Transmission Belgium, \u20ac46.7 mi<span class=\"ff3f\">lli<span class=\"_ _e\"></span>on in 50Hertz </span>Transmission a<span class=\"_ _2\"></span>nd \u20ac0.7 million in the non<span class=\"ff3f\">-<span class=\"_ _e\"></span>regulated activities and Nemo L<span class=\"_ _2\"></span>ink segment. <span class=\"_ _e\"></span> </span>During 2022, \u20ac0.6<span class=\"ff3f\"> m<span class=\"_ _2\"></span>illion in borrowing costs were capitalised on <span class=\"ff42\">software in development (compared with \u20ac0.3</span> <span class=\"_ _e\"></span>million in 2021) in the </span>Elia Transm<span class=\"_ _2\"></span>ission Belgium segment, based on an averag<span class=\"_ _e\"></span>e interest rate of 1.91% (1.92% in 2021<span class=\"ls8f\">).</span> No borrowing co<span class=\"_ _e\"></span>sts on software in development were ca<span class=\"_ _2\"></span>pitalised in the 50Hertz Transmission segment.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> does not hold individual intangible asse<span class=\"_ _e\"></span>ts that are material to its financial statements, except capacity e<span class=\"_ _e\"></span>ntitlements <span class=\"ls1c\">in</span> the Kontek cable<span class=\"_ _2\"></span> (Denmark) that amount to <span class=\"ff42\">\u20ac16.5 million (</span>wit<span class=\"_ _e\"></span>h a remaining useful life of 10 years (until 2033)). 6.3. <span class=\"_ _87\"> </span>Goodwill There were<span class=\"_ _2\"></span> no changes in goodwill during the years 2<span class=\"_ _e\"></span>021-2022. The carr<span class=\"_ _2\"></span>ying a<span class=\"_ _e\"></span>mount <span class=\"_ _2\"></span>is the following:<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Good<span class=\"_ _2\"></span>will<span class=\"_ _e\"></span> ACQUISITION VALUE Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 2,411.1 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 2,411.1 Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 2,411.1 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 2,411.1 The goodwill re<span class=\"_ _2\"></span>lates to the following business combinations and is allocated to the cash g<span class=\"_ _e\"></span>enerating unit (CGU) Elia Transmission for the acquisition o<span class=\"_ _2\"></span>f Elia Asset and Elia Engineering and to the CGU 50Hertz Transmission for the acquisition of the 20% stake <span class=\"_ _e\"></span>in Eurogrid Internationa<span class=\"_ _2\"></span>l: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>Acquisition Elia Asset <span class=\"ff42\">\u2013</span> 2002 1,700.1 Acquisition Elia Enginee<span class=\"_ _2\"></span>ring <span class=\"ff42\">\u2013</span> <span class=\"ls5b\">2004<span class=\"_ _e\"></span></span> 7.7 Acquisition Eurogrid In<span class=\"_ _2\"></span>ternational <span class=\"ff42\">\u2013</span> <span class=\"ls5b\">2018<span class=\"_ _e\"></span></span> 703.4 Total 2,411.1 IMPAIRMENT TEST FOR CASH-GENERATING UNITS CONTAINING GOODWILL According to<span class=\"_ _2\"></span> IFRS rules, goodwill should be tested for impairment <span class=\"ls5b\">on <span class=\"_ _e\"></span></span>at least an annual basis or upon the occurrence of a triggering event. Goodwill is alloca<span class=\"_ _2\"></span>ted to the CGUs Elia Transmission and 50Hertz Transmission for impairment te<span class=\"_ _2\"></span>sting. <span class=\"_ _e\"></span>Cas<span class=\"_ _e\"></span>h-generating units to which good<span class=\"_ _2\"></span>will has been allocated are tested for impairment at least annually. <span class=\"_ _e\"></span> The recoverable amou<span class=\"_ _2\"></span>nt of CGUs is determined by reference to a value in use that is calculated b<span class=\"_ _e\"></span>ased on different metho<span class=\"_ _2\"></span>ds (Discounted Cash F<span class=\"_ _2\"></span>low and Discounted Dividend Model) <span class=\"_ _e\"></span>using <span class=\"ff40\">cash flow projections</span> drawn up on the basis of the 2022 reforecast and the 2023-2027 bu<span class=\"_ _2\"></span>siness plan, as approved by the Ma<span class=\"_ _e\"></span>nagement Committee and the Board of Directors, and on extrapolated cash flows beyond that time frame<span class=\"_ _2\"></span>. <span class=\"_ _e\"></span><span class=\"ff40 fc1d\"> </span>The forecast<span class=\"_ _2\"></span>s and projections included in the reference scenario were determined on the basis of the estimated investment pla<span class=\"_ _e\"></span>ns, remuneration de<span class=\"_ _2\"></span>fined in the regulatory frameworks, market<span class=\"_ _e\"></span> evolution, market share and margin evolution<span class=\"ls1d\">. </span>As the <span class=\"ff42\">g<span class=\"_ _e\"></span>roup\u2019s </span>asset base consists of a<span class=\"_ _2\"></span>ssets with long useful liv<span class=\"_ _e\"></span>es, the <span class=\"ff42\">business plan\u2019s</span> projection period was set to encompass the coming two regulatory periods.<span class=\"_ _e\"></span> The <span class=\"ff40\">discount rate<span class=\"_ _2\"></span>s<span class=\"ff3f\"> used correspond to the weighted ave<span class=\"_ _e\"></span>rage cost of capital, which is adjusted in order to reflect the business, market, </span></span>country and currency risk relating<span class=\"_ _2\"></span> to each goodwill CGU r<span class=\"_ _e\"></span>eviewed. The d<span class=\"_ _2\"></span>iscount rates used are consistent with avail<span class=\"_ _e\"></span>abl<span class=\"_ _e\"></span>e external informa<span class=\"_ _2\"></span>tion sources.<span class=\"_ _e\"></span> The <span class=\"ff40\">g<span class=\"_ _2\"></span>rowth rates<span class=\"ff3f\"> associated with the terminal values <span class=\"ls5b\">do</span> <span class=\"_ _e\"></span>not exceed the inflation rate or the long-term average growth rate for the </span></span>market <span class=\"_ _2\"></span>to which the CGU is dedicated.<span class=\"_ _e\"></span> More details are p<span class=\"_ _2\"></span>rovided below by CGU.<span class=\"_ _e\"></span> Acquisi<span class=\"_ _e\"></span>tion<span class=\"_ _2\"></span> of Elia Asset and Elia Engineering In 2002, the<span class=\"_ _2\"></span> acquisition of Elia Asset by the Company for <span class=\"_ _e\"></span><span class=\"ff42\">\u20ac3,304.1</span> million resulted in a positive consolidation difference of \u20ac1,700<span class=\"_ _2\"></span>.1<span class=\"ff3f\"> million. This positive consolidation difference was the result of the difference between the acquisition value of th<span class=\"_ _2\"></span>is entity<span class=\"_ _e\"></span> an<span class=\"_ _e\"></span>d </span>the carrying amount of its<span class=\"_ _2\"></span> assets. This difference consists<span class=\"_ _e\"></span> of various aspect<span class=\"_ _2\"></span>s such as the fact that (i) Elia was appointed as a TSO for a period of 20<span class=\"_ _2\"></span> years (ii) Elia had unique resources in Belgium as <span class=\"ls1c\">it</span> owns the whole of ex<span class=\"_ _e\"></span>tra-high-voltage grid and owns 94% of the high-voltage grid (<span class=\"_ _2\"></span>or has the right to use this), and hence only Eli<span class=\"_ _e\"></span>a is entitled<span class=\"_ _2\"></span> to put forward a development plan and (iii) Elia had the relevant TSO know-how. At the date of a<span class=\"_ _2\"></span>cquisition, the description or the quantification in euros of these aspects could not be performed on an objective<span class=\"_ _e\"></span>, transparent and reliab<span class=\"_ _2\"></span>le basis and, the difference could not therefore be allocated to specific assets and was consi<span class=\"_ _e\"></span>dered unallocated. This difference<span class=\"_ _2\"></span> has consequently been recognised as goo<span class=\"_ _e\"></span>dwill since the initia<span class=\"_ _2\"></span>l adoption of IFRS in 2005. The regulatory <span class=\"_ _e\"></span>framework, in particular the<span class=\"_ _2\"></span> offsetting in the tariffs of the decommissioning of fixed assets, applicable from 2008 onwards, did not have an i<span class=\"_ _e\"></span>mpact on this accoun<span class=\"_ _2\"></span>ting treatment. The goodwill described above and the goodwill resulting from the acquisition<span class=\"_ _2\"></span> o<span class=\"_ _e\"></span>f Eli<span class=\"_ _e\"></span>a Engineering in 2004 were allocated to the<span class=\"_ _2\"></span> single cash-generating unit for the impairment test determined, since the income and expenses we<span class=\"_ _e\"></span>re generated by one activity, specifically 're<span class=\"_ _2\"></span>gulated activity in Belgium', which will also be considered one CGU.<span class=\"_ _e\"></span> As a result, the group assigned the carrying amount of the goodwill to<span class=\"_ _2\"></span> one unit, n<span class=\"_ _e\"></span>amely the regulated activity in Belgium. Since 2004, annual impairment <span class=\"_ _2\"></span>tests have been conducted and have not resulted in the r<span class=\"_ _e\"></span>ecognition of any impairment losses. The impairment te<span class=\"_ _2\"></span>st was conducted by an independent expert. This imp<span class=\"_ _e\"></span>airment test is based on the value in use and uses two main valuation methods to e<span class=\"_ _2\"></span>stimate the recoverable amount: 1<span class=\"_ _e\"></span>) a discounted cash flows method (DCF); and 2) a dividend discount model (DDM), b<span class=\"_ _2\"></span>oth of which are further detached in valuation variants de<span class=\"_ _e\"></span>pending on the terminal value calculation. Future cash f<span class=\"_ _2\"></span>lows and future dividends a<span class=\"_ _e\"></span>re based on a business plan for t<span class=\"_ _2\"></span>he period 2022-<span class=\"_ _e\"></span>2032. As the <span class=\"ff42\">group\u2019s </span>asset base consists of assets with long useful lives, the <span class=\"ff42\">business plan\u2019s</span> projection period was set to encompass the coming two regulatory periods. Note that the regulatory framewor<span class=\"_ _2\"></span>k within which Elia operates is characteris<span class=\"_ _e\"></span>ed by an allowed revenues basis structured around: 1) a fair remuneration of <span class=\"_ _2\"></span>the regulat<span class=\"ls5b\">ed</span> asse<span class=\"_ _e\"></span>t base; <span class=\"ls5b\">and <span class=\"_ _e\"></span></span>2) incentives to guarantee the continuity of supply and improve efficiency. Considering that the regulator will allow a f<span class=\"_ _2\"></span>air remuneration of the regul<span class=\"_ _e\"></span>at<span class=\"ls5b\">ed</span> asset base consistent with market expectations, the <span class=\"_ _e\"></span>estimated regulat<span class=\"ls5b\">ed</span> asset base for the last forecast year can be considered an indication of the terminal va<span class=\"_ _2\"></span>lue. T<span class=\"_ _e\"></span>his approach does not take into account potentia<span class=\"_ _2\"></span>l cash flows gene<span class=\"_ _e\"></span>rated by meeting or beating future efficiency targets. The va<span class=\"_ _2\"></span>luation methods are subject to different assumptions<span class=\"_ _e\"></span>, the most important of which are outlined below. 1.<span class=\"ls0\"> <span class=\"_ _53\"></span><span class=\"ff3f fs11 fc3\">Discounting <span class=\"_ _e\"></span>of future<span class=\"_ _2\"></span> cash flows (DCF-m<span class=\"_ _e\"></span>odels): </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity of 9.3%; </span></span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Risk-fr<span class=\"_ _2\"></span>ee-rate: 2.2% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Beta<span class=\"_ _2\"></span> 0.93 </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Equity m<span class=\"_ _2\"></span>arket risk premium 5.5% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Cou<span class=\"_ _2\"></span>ntry risk premium 1.0% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Sma<span class=\"_ _2\"></span>ll firm premium 1.0% </span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Pre-tax Cost of Debt of 3.8%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Corporate tax rate of 25%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Target gearing (D/(D+E)): 60%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Post-tax WACC: 5.4%. </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on two variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a 1.13x RAB multiple in 2032  </span></span>NB: as such, the RAB itself does not take into account the contribution that the incentive remuneration makes to the value creation<span class=\"_ _2\"></span> process.<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal <span class=\"_ _20\"></span>value <span class=\"_ _20\"></span>based <span class=\"_ _e\"></span>on<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>a <span class=\"_ _20\"></span>perpetual <span class=\"_ _e\"></span>g<span class=\"_ _e\"></span>rowth <span class=\"_ _20\"></span>rate <span class=\"_ _20\"></span>of <span class=\"_ _e\"></span>3.<span class=\"_ _e\"></span>3<span class=\"_ _e\"></span>%. <span class=\"_ _20\"></span>This <span class=\"_ _20\"></span>long<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>term <span class=\"_ _20\"></span>growth <span class=\"_ _20\"></span>rate <span class=\"_ _e\"></span>is <span class=\"_ _20\"></span>hi<span class=\"_ _e\"></span>gher <span class=\"_ _20\"></span>than <span class=\"_ _20\"></span>long<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>term <span class=\"_ _20\"></span>expected </span></span>inflation to<span class=\"_ _2\"></span> capture the returns generated from the si<span class=\"_ _e\"></span>gnificant investments in the business plan. 2.<span class=\"ls0\"> <span class=\"_ _53\"></span><span class=\"ff3f fs11 fc3\">Discounting <span class=\"_ _e\"></span>of future<span class=\"_ _2\"></span> dividends <span class=\"_ _e\"></span>(DDM-models):  </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity of 9.3% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on two variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on 1.13x RAB multiple in 2032<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> </span></span>NB: as such, th<span class=\"_ _2\"></span>e RAB<span class=\"_ _e\"></span> itself does <span class=\"_ _2\"></span>not take into account <span class=\"_ _e\"></span>the contribution of the incentive remuneration to the value creation process. o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a perpetual growth rate of 3.3<span class=\"_ _e\"></span><span class=\"ls24\">%.</span> Th<span class=\"_ _2\"></span>is approach assumes that the residual value consists <span class=\"_ _e\"></span>of profit </span></span>after tax less invest<span class=\"_ _e\"></span>ments and considers <span class=\"_ _e\"></span>net borrowings (i<span class=\"_ _e\"></span>n relation to th<span class=\"_ _e\"></span>e investments). <span class=\"_ _e\"></span>Howeve<span class=\"_ _e\"></span>r, profit <span class=\"_ _e\"></span>and thus di<span class=\"_ _e\"></span>vidend<span class=\"_ _e\"></span> paymen<span class=\"_ _2\"></span>ts in FY32 most likely does not yet reflect the (po<span class=\"_ _e\"></span>sitive) impact of the investments planned in FY26-FY32.<span class=\"_ _e\"></span> Conclusion: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> independent analysis, which was based on a <span class=\"ff42\">(\u20ac3,127 million)</span> midpoint of the different valuation approaches and variants </span></span>used did not result in<span class=\"_ _2\"></span> the identification of an<span class=\"_ _e\"></span> impairment of goodwill in the financial year 2022. Moreover, market multiples (based on current <span class=\"_ _2\"></span>enterprise values and current/forecasted EBITDA) were applied for plausibility.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">As the m<span class=\"_ _2\"></span>edian and the average of the different methods presented above w<span class=\"ff42\">er<span class=\"_ _e\"></span>e relatively far apart (\u20ac2.625 million and \u20ac4.635</span> </span></span>million respectively), mainly d<span class=\"_ _2\"></span>ue to differen<span class=\"ff42\">ces in <span class=\"_ _e\"></span>assumptions for<span class=\"_ _2\"></span> the terminal value, the expert\u2019s mid<span class=\"ff3f\">-poi<span class=\"_ _e\"></span>nt is based on 75% of </span></span>the median and 25<span class=\"_ _2\"></span>% of the average, bearing in mind, among other factors, that the median alone might not appropriately reflect the impa<span class=\"_ _2\"></span>ct of incentive remuneration on the t<span class=\"_ _e\"></span>erminal value (see above for more details)<span class=\"_ _2\"></span>. <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Due to<span class=\"_ _2\"></span> the increase in 2022 in the interest rates, the discount rate has increased significantly compared to last year. This <span class=\"_ _e\"></span>increase </span></span>has been fully ta<span class=\"_ _2\"></span>ken into account in the cost of equity wit<span class=\"_ _e\"></span>hout considering that it could be more linked to the maximu<span class=\"_ _e\"></span>m allowed return. Th<span class=\"_ _2\"></span>is approach results in conservative values. T<span class=\"_ _e\"></span>he valorisation is also impacted by the significant investments (and related cash outs) expected on the horizon of the plan (a<span class=\"_ _2\"></span>cceleration of the energy transition) whereas the returns on these investments will materialise<span class=\"_ _2\"></span> over a longer period. I<span class=\"_ _e\"></span>n this context, and all other things being equal, an increase of 1% of the cost of equity/ 50 basis point <span class=\"_ _2\"></span>in the WACC (market reference) would result i<span class=\"_ _e\"></span>n a 22% lower value<span class=\"_ _2\"></span> in use and a potential impairment loss of around \u20ac<span class=\"ff3f\">385.0<span class=\"_ _2\"></span> million. The evolution of market parameters is clos<span class=\"_ _e\"></span>ely monitored b<span class=\"_ _2\"></span>y the group <span class=\"_ _e\"></span>with the regulator in order to s<span class=\"_ _e\"></span>ecure the </span>realization<span class=\"_ _2\"></span> of the expected investments and allow ETB to <span class=\"_ _e\"></span>keep a strong<span class=\"_ _2\"></span> position in the market. A<span class=\"_ _e\"></span> decrease of 1% of the cost of equity/ 50 basis points in the d<span class=\"_ _2\"></span>iscount rates used would le<span class=\"_ _e\"></span>ad to an increase in the value of <span class=\"_ _2\"></span>the CGU of around \u20ac<span class=\"_ _e\"></span><span class=\"ff3f\">1,2<span class=\"_ _e\"></span>05.0 million<span class=\"_ _2\"></span>. </span>Acquisi<span class=\"_ _e\"></span>tion<span class=\"_ _2\"></span> of Eurogrid International \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In April 2<span class=\"_ _2\"></span>018, the acquisition of an extra 20% stake in Eurogrid International by the group <span class=\"ff42\">for \u20ac988.7</span> million resulted<span class=\"_ _e\"></span> in a goodwill </span></span>of \u20ac703.4<span class=\"ff3f\"> million, being the d<span class=\"_ _2\"></span>ifference between the ac<span class=\"_ _e\"></span>quisition value of this stake and the proportional carrying amount of its </span>assets. The goodwill re<span class=\"_ _2\"></span>sulting from the additional 20% sta<span class=\"_ _e\"></span>ke in Eurogrid In<span class=\"_ _2\"></span>ternational was allocated to the <span class=\"_ _e\"></span>CGU 50Hertz Transmission, sin<span class=\"_ _2\"></span>ce it comprises all income and ex<span class=\"_ _e\"></span>penses generated<span class=\"_ _2\"></span> thereof.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> impairment test was conducted by an independent expert. This impairment test is based on two main valuation methods: 1<span class=\"_ _e\"></span>) a </span></span>discounted cash flo<span class=\"_ _2\"></span>ws (DCF) method; a<span class=\"_ _e\"></span>nd 2) a dividend discount m<span class=\"_ _2\"></span>odel (DDM). Both <span class=\"_ _e\"></span>of these are further detached in valuation variants depending on the<span class=\"_ _2\"></span> terminal value calculation. Future cash flows and future dividends are based on a busi<span class=\"_ _e\"></span>ne<span class=\"_ _e\"></span>ss plan for the<span class=\"_ _2\"></span> period 2021-2031 (two regulatory periods). As the <span class=\"ff42\">group\u2019s </span>asset base consists of assets with long useful lives, the <span class=\"ff42\">b<span class=\"_ _e\"></span>usiness plan\u2019s</span> projection period was set to encompass the next two regulatory periods. The va<span class=\"_ _2\"></span>luation methods are subject to different assumptions, most importantly:<span class=\"_ _e\"></span> 1.<span class=\"ls0\"> <span class=\"_ _53\"></span><span class=\"ff3f fs11 fc3\">Discounting <span class=\"_ _e\"></span>of future<span class=\"_ _2\"></span> cash flows (DCF-m<span class=\"_ _e\"></span>odels): </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity: 8.3%; </span></span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Risk-fr<span class=\"_ _2\"></span>ee-rate: 2.2% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Beta<span class=\"_ _2\"></span> 0.93 </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Equity m<span class=\"_ _2\"></span>arket risk premium 5.5% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Cou<span class=\"_ _2\"></span>ntry risk premium 0.0% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Sma<span class=\"_ _2\"></span>ll firm premium 1.0% </span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Pre-tax Cost of Debt: 3.8%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Corporate tax rate: 30%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Target gearing (D/(D+E)): 60%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">WAC<span class=\"_ _e\"></span>C: 4.9%. </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on three variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a 1<span class=\"ls1d\">.1</span>3x RAB multiple in 2032; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a perpetual growth rate of 2.0<span class=\"ls24\">%.</span> </span></span>2.<span class=\"ls0\"> <span class=\"_ _57\"></span><span class=\"ff3f fs11 fc3\">D<span class=\"_ _e\"></span>iscounting of future dividends <span class=\"_ _e\"></span>(DDM-models): <span class=\"_ _2\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity: 8.3% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on two variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on 1.13x RAB multiple in 2032;<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a perpetual growth rate of 2.0%. </span></span>Conclusion: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Neither<span class=\"_ _2\"></span> the independent analysis, which was based on a <span class=\"ff42\">(<span class=\"_ _e\"></span>\u20ac2,602 million)</span> midpoint of the different valuation approaches and<span class=\"_ _2\"></span> </span></span>variants u<span class=\"_ _2\"></span>sed, nor the sensitivity analysis result<span class=\"ls5b\">ed</span> in<span class=\"_ _e\"></span> the identification of an impairment of goodwill in the financial year 2022<span class=\"ls1d\">. </span>Moreo<span class=\"_ _2\"></span>ver, market multiples (based on current enterprise values and current/forecasted EBITDA) were applied for plausibility.<span class=\"_ _20\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> median of the different methods presented above w<span class=\"ff42\">e<span class=\"_ _e\"></span>re rela<span class=\"_ _2\"></span>tively close (\u20ac2,602 million and \u20ac3,055 million respectively), as the </span></span></span>assumptions for<span class=\"_ _2\"></span> the terminal value were similar. Neither the independent analysis<span class=\"_ _e\"></span> based on a median of the different valuation approaches and variants used, nor the sensitivity analysis resulted in the identification of an impairment of goodwill in the financial year 2022. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Due to<span class=\"_ _2\"></span> the increase in 2022 in the interest rates, the discount rate has increased significantly compared to last year. This <span class=\"_ _e\"></span><span class=\"ls1c\">in</span>crease </span></span>has been fully ta<span class=\"_ _2\"></span>ken into account in the cost of equity wit<span class=\"_ _e\"></span>hout considering that it could be more linked to the maximu<span class=\"_ _e\"></span>m allowed return. Th<span class=\"_ _2\"></span>is approach results in conservative values. T<span class=\"_ _e\"></span>he valorisation is also impacted by the significant investments (and related cash outs) expected on the horizon of the plan (a<span class=\"_ _2\"></span>cceleration of the energy transition) whereas the returns on these investments will materialise<span class=\"_ _2\"></span> over a longer period. I<span class=\"_ _e\"></span>n this context, and all other things being equal, an increase of 1% of the cost of equity/ 50 basis point <span class=\"_ _2\"></span>in the WACC (market reference) would result i<span class=\"_ _e\"></span>n a <span class=\"ls5b\">19</span>% lower value in use, being a value slightly higher than the book value. A decrease<span class=\"_ _2\"></span> of 1% of the cost of equity/ 50 basis points in the discount rates used would lead to an increase i<span class=\"_ _e\"></span>n the value of the CGU of arou<span class=\"_ _2\"></span>nd \u20ac<span class=\"ff3f\">385.8 million.<span class=\"_ _e\"></span> </span>6.4. <span class=\"_ _87\"> </span>Non current trade and other receivables The non curren<span class=\"_ _2\"></span>t trade and other receivables are mainly composed by <span class=\"ff42\">th<span class=\"_ _e\"></span>e long term part of the granted investment subsidy (\u20ac95.0 </span>million). On 20 November 2022, a Ro<span class=\"_ _2\"></span>yal Decree has granted an investment subsidy for the creation of an offshore artificial islan<span class=\"_ _e\"></span>d (The Princess Elisabeth Islan<span class=\"_ _2\"></span>d) within the framework of t<span class=\"_ _e\"></span>he Recovery and Resilience Facility (EU instrument to support project of Member State<span class=\"_ _2\"></span>s and help the<span class=\"_ _2\"></span> EU emerge stronger and more resilient from the current crisis<span class=\"_ _e\"></span>). This island will serve as a multifunctional energy hub/an extension of the electr<span class=\"_ _2\"></span>icity grid in the North Sea. It will connect wind farms from the sea to the mainland and create new co<span class=\"_ _e\"></span>nnections with neighbour<span class=\"_ _2\"></span>ing countries. The text of the RD provides that the practical details will be agreed upon by a \u201cProtocol\u201d betwe<span class=\"ff3f\">e<span class=\"_ _e\"></span>n the State </span>and Elia. T<span class=\"_ _2\"></span>his Protocol was signed on 14 December 2022, providing for the intervention of the SPF Economy up to <span class=\"_ _e\"></span><span class=\"ff42\">a subsidy of \u20ac99,7 </span>millions out <span class=\"_ _2\"></span>of a total budgeted investment of circa \u20ac600.0 millions.<span class=\"_ _20\"></span><span class=\"ff3f\"> </span>Out of th<span class=\"_ _2\"></span>is amount, \u20ac97.5 million are classified as an investment grant agains<span class=\"ff3f\">t<span class=\"_ _e\"></span> </span>\u20ac2.2 million as operational grant. Cash will be collected as predefined milesto<span class=\"_ _2\"></span>nes are <span class=\"ff42\">reached. The agreed planni<span class=\"_ _e\"></span>ng resu<span class=\"_ _2\"></span>lts in a split \u20ac95.0 million classified as long term and \u20ac4.7 million in </span>short term. The recoverability of <span class=\"_ _2\"></span>this amount is contractually guaranteed. No credit risk has been considered on this long<span class=\"_ _e\"></span>-term receivable.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.5. <span class=\"_ _87\"> </span>Equity-accounted investees The movements in t<span class=\"_ _2\"></span>he equity-accounted investees are su<span class=\"_ _e\"></span>mmarised as fo<span class=\"_ _2\"></span>llows: <span class=\"_ _e\"></span> (in \u20ac<span class=\"ff40\"> <span class=\"_ _2\"></span>million)<span class=\"_ _e\"></span> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Equity<span class=\"_ _2\"></span> accounted investees (opening balance)<span class=\"_ _e\"></span> 309.6 323.1 Profit for the ye<span class=\"_ _2\"></span>ar<span class=\"_ _e\"></span> 39.5 49.<span class=\"ls0\">4 </span>Dividends re<span class=\"_ _2\"></span>ceived by the Group (34.2) (30.9) Capital re<span class=\"_ _2\"></span>payment of equity accounted investee<span class=\"_ _e\"></span> (53.8) (30.5) Investment in e<span class=\"_ _2\"></span>quity accounted investee<span class=\"_ _e\"></span> Sale of equ<span class=\"_ _2\"></span>ity accounted investee<span class=\"_ _e\"></span> (1.5) Equity<span class=\"_ _2\"></span> accounted investees (closing balance)<span class=\"_ _e\"></span> 261.2 309.6 Of which joint <span class=\"_ _2\"></span>ventures<span class=\"_ _e\"></span> 243.4 292.1 Of which associa<span class=\"_ _2\"></span>tes<span class=\"_ _e\"></span> 17.8 17.5 Details are<span class=\"_ _2\"></span> given in the subchapters below. <span class=\"_ _e\"></span> 6.5.1. <span class=\"_ _5b\"></span>Jo<span class=\"_ _e\"></span>int ventures Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Nemo Lin<span class=\"_ _2\"></span>k Ltd<span class=\"_ _e\"></span> On 27 February <span class=\"_ _2\"></span>2015, Elia System Operator and National<span class=\"_ _e\"></span> Grid signed a jo<span class=\"_ _2\"></span>int venture agreement to build the Nemo Link Interconnector between Be<span class=\"_ _2\"></span>lgium and the UK. This project consists of subsea and underground cables connected to converter stati<span class=\"_ _e\"></span>ons and an electricity sub<span class=\"_ _2\"></span>stations in each country, allowing <span class=\"_ _e\"></span>electricity to flow in either d<span class=\"_ _2\"></span>irection between the two countries, s<span class=\"_ _e\"></span>o giving the UK and Belgium improved reliab<span class=\"_ _2\"></span>ility and access to electricity and sustainable generation. Each shareholder holds a 50% stake in Nemo<span class=\"_ _20\"></span> Lin<span class=\"_ _2\"></span>k Ltd, a UK company.<span class=\"_ _2\"></span> The interconnection was co<span class=\"_ _e\"></span>mmissioned in late<span class=\"_ _2\"></span> January 2019. <span class=\"_ _e\"></span> To finance th<span class=\"_ _2\"></span>e project both shareholders have provided funding to Nemo Link Ltd since 2016 via equity contributions and loans<span class=\"_ _e\"></span> (divided on a 50/50 basis). In June<span class=\"_ _2\"></span> 2019, the loans were incorpora<span class=\"_ _e\"></span>ted in the share capital (loan swap to equity).<span class=\"_ _e\"></span> In 2022, Nemo<span class=\"_ _2\"></span> Link Ltd reduced its share capital by <span class=\"ff42\">\u20ac107.<span class=\"_ _e\"></span>6 million</span> (<span class=\"ff42\">\u20ac61.0 million</span> in 2021). In addition to these capital reduction rounds, dividends totalling <span class=\"ff42\">\u20ac64.0 million</span> (<span class=\"ff42\">\u20ac58.0 million</span> in 2021) were paid out to its shareholders.  The fo<span class=\"_ _2\"></span>llowing table summarises the financial information of the joint venture, based on its IFRS financial statements and rec<span class=\"_ _e\"></span>onciliation with the carrying<span class=\"_ _2\"></span> amount for the group's interest in the co<span class=\"_ _e\"></span>nsolidated<span class=\"_ _2\"></span> financial statements.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Percentage o<span class=\"_ _2\"></span>wnership interest 50.0% 50.0% Non-current assets 591.3 617.4 -Current asse<span class=\"_ _2\"></span>ts 29.1 19.5 Non-current <span class=\"_ _2\"></span>liabilities 111.2 41.0 Curren<span class=\"_ _2\"></span>t liabilities<span class=\"_ _e\"></span> 22.3 11.6 Equity 486.9 584.2 Group's ca<span class=\"_ _2\"></span>rrying amount for the interest 243.4 292.1 Revenues and o<span class=\"_ _2\"></span>ther income 122.0 151.1 Total depre<span class=\"_ _2\"></span>ciation and amortisation<span class=\"_ _e\"></span> (27.1) (27.0) Other operating e<span class=\"_ _2\"></span>xpenses 2.9 (7.7) Net finance<span class=\"_ _2\"></span> costs<span class=\"_ _e\"></span> (5.6) (1.0) Profit before income t<span class=\"_ _2\"></span>ax 92.3 115.3 Income tax exp<span class=\"_ _2\"></span>ense<span class=\"_ _e\"></span> (18.1) (21.2) Profit for the ye<span class=\"_ _2\"></span>ar<span class=\"_ _e\"></span> 74.2 94.0 Total comprehensive<span class=\"_ _2\"></span> income for the year<span class=\"_ _e\"></span> 74.2 94.0 Group's share o<span class=\"_ _2\"></span>f profit for the year<span class=\"_ _e\"></span> 37.1 47.0 Dividends re<span class=\"_ _2\"></span>ceived by the Group 32.0 29.0 Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.5.2. <span class=\"_ _5b\"></span>Asso<span class=\"_ _e\"></span>ciates As <span class=\"ls5b\">of</span> 31 December 2022<span class=\"ls1d\">, t</span>he group has 2 associates, both being equity-<span class=\"_ _e\"></span>accounted investees.  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> group has a 22.2% stake in Coreso SA/NV. Coreso S<span class=\"_ _e\"></span>A/NV is a company that p<span class=\"_ _2\"></span>rovides coordination services aimed at </span></span>facilitating the secure o<span class=\"_ _2\"></span>peration of t<span class=\"_ _e\"></span>he high-voltage grid in several European countries.  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> group holds a 17.0% stake in HGRT <span class=\"ls27\">SAS</span>. HGRT SAS is a French company with a 49.0% stake in Epex Spot, the exchange </span></span>for po<span class=\"_ _2\"></span>wer spot trading in Germany, France, Austria, Switzerland, Luxembourg and (th<span class=\"_ _e\"></span>rough its 100% associate APX) the UK, Netherlands and Belgium<span class=\"_ _2\"></span>. As one of the founding partner<span class=\"_ _e\"></span>s of HGRT, the group has a 'golden share', giving it a minimum number of represen<span class=\"_ _2\"></span>tatives on <span class=\"ff42\">HGRT\u2019s</span> Board of Directors. This constitutes a significant influence and therefore HGRT is accounted for using the<span class=\"_ _2\"></span> equity method. In 2022, the <span class=\"_ _e\"></span><span class=\"ff42\">group received a dividend of \u20ac2.2</span> milli<span class=\"ff42\">on from HGRT (\u20ac1.9 million in 2021</span><span class=\"ls8f\">).<span class=\"_ _e\"></span></span> None of these compa<span class=\"_ _2\"></span>nies are listed on any public exchange.<span class=\"_ _e\"></span> The fo<span class=\"_ _2\"></span>llowing scope changes are to be reported:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">2022<span class=\"_ _2\"></span>: none </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">2021<span class=\"_ _2\"></span>: The investment in Enervalis NV (16,5%), a start-up <span class=\"_ _e\"></span>that develops innovative software for smart <span class=\"_ _2\"></span>control of ene<span class=\"_ _e\"></span>rgy sour<span class=\"_ _2\"></span>ces, </span></span>was sold in Apr<span class=\"_ _2\"></span>il 2021 resulting in a gain of \u20ac0.15 million<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>The fo<span class=\"_ _2\"></span>llowing table illustrates the summarise<span class=\"ls5b\">d </span>fi<span class=\"_ _e\"></span>nancial information of the group's investment in these companies, based on their respective<span class=\"_ _2\"></span> financial statements prepared in accordance with IFRS.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Coreso HGRT 2021<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Percentage o<span class=\"_ _2\"></span>wnership interest 22.2% 17.0% Non-current assets 8.2 96.5 Curren<span class=\"_ _2\"></span>t assets<span class=\"_ _e\"></span> 4.5 0.8 Curren<span class=\"_ _2\"></span>t liabilities<span class=\"_ _e\"></span> 8.2 0.0 Equity 4.5 97.3 Group's ca<span class=\"_ _2\"></span>rrying amount for the interest 1.0 16.5 Revenue 25.7 0.0 Other operating e<span class=\"_ _2\"></span>xpenses (24.6) 13.2 Profit before income t<span class=\"_ _2\"></span>ax 1.1 13.2 Income tax exp<span class=\"_ _2\"></span>ense<span class=\"_ _e\"></span> (0.4) (0.1) Profit for the ye<span class=\"_ _2\"></span>ar<span class=\"_ _e\"></span> 0.7 13.1 Total comprehensive<span class=\"_ _2\"></span> income for the year<span class=\"_ _e\"></span> 0.7 13.1 Group's share o<span class=\"_ _2\"></span>f profit for the year<span class=\"_ _e\"></span> 0.2 2.2 Dividends re<span class=\"_ _2\"></span>ceived by the Group 1.9 (in \u20ac million)<span class=\"ff40\"> </span>Coreso HGRT 2022<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>Percentage o<span class=\"_ _2\"></span>wnership interest 22.2% 17.0% Non-current assets 10.1 96.9 Curren<span class=\"_ _2\"></span>t assets<span class=\"_ _e\"></span> 3.1 0.7 Curren<span class=\"_ _2\"></span>t liabilities<span class=\"_ _e\"></span> 7.9 0.0 Equity 5.3 97.5 Group's ca<span class=\"_ _2\"></span>rrying amount for the interest 1.2 16.6 Revenue 28.3 0.0 Other operating e<span class=\"_ _2\"></span>xpenses (27.1) 13.4 Profit before income t<span class=\"_ _2\"></span>ax 1.3 13.4 Income tax exp<span class=\"_ _2\"></span>ense<span class=\"_ _e\"></span> (0.5) (0.1) Profit for the ye<span class=\"_ _2\"></span>ar<span class=\"_ _e\"></span> 0.8 13.2 Total comprehensive<span class=\"_ _2\"></span> income for the year<span class=\"_ _e\"></span> 0.8 13.2 Group's share o<span class=\"_ _2\"></span>f profit for the year<span class=\"_ _e\"></span> 0.2 2.2 Dividends re<span class=\"_ _2\"></span>ceived by the Group 2.2 Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.6. <span class=\"_ _87\"> </span>Other financial assets (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Immedia<span class=\"_ _2\"></span>tely claimable deposits<span class=\"_ _e\"></span> 7.0 7.0 Reimbursemen<span class=\"_ _2\"></span>t rights<span class=\"_ _e\"></span> 33.7 46.2 Other shareholding<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> 75.7 43.8 Other 0.8 Non-current deriva<span class=\"_ _2\"></span>tives 0.0 39.4 Other financial <span class=\"_ _2\"></span>assets (non-current)<span class=\"_ _e\"></span> 117.2 136.3 Curren<span class=\"_ _2\"></span>t derivatives<span class=\"_ _e\"></span> 219.7 316.2 Other financial <span class=\"_ _2\"></span>assets (current) 219.7 316.2 Other financial <span class=\"_ _2\"></span>assets<span class=\"_ _e\"></span> 336.9 452.5 The total other f<span class=\"_ _2\"></span>inancial assets decreased by \u20ac115.6 million compared with the previous <span class=\"ff3f\">yea<span class=\"_ _e\"></span>r. </span>Immedia<span class=\"_ _2\"></span>tely claimable deposits are measured at fair value. The risk profile of these investments is discussed in Note 8.1. <span class=\"_ _e\"></span>The value as at 31 December 2022 is stab<span class=\"_ _2\"></span>le compared to 2021.<span class=\"_ _e\"></span> Re<span class=\"ls0\">imbur<span class=\"_ _2\"></span>sement rights are linked to the obligations regard<span class=\"_ _e\"></span>ing (i) the retired employees falling under sp<span class=\"_ _2\"></span>ecific benefit <span class=\"_ _e\"></span>schemes (<span class=\"_ _2\"></span>Scheme<span class=\"_ _e\"></span> <span class=\"ls27\">B </span></span>- unfunded<span class=\"_ _2\"></span> plan); <span class=\"ls5b\">an</span>d <span class=\"_ _e\"></span>for (ii) health plan and reduced energy pricing plans for retired staff members. See Note 6.14<span class=\"_ _e\"></span><span class=\"ff42\">: \u2018Employee benefits\u2019. </span>The reimbursem<span class=\"_ _2\"></span>ent rights are recoverable through the regulated tariffs. The following principle applies: all incurred pension c<span class=\"_ _e\"></span>osts for 'Scheme B' retired<span class=\"_ _2\"></span> employees and the costs linked to healthcare and r<span class=\"_ _e\"></span>educed energy pricing plans for retired Elia staff members are defined by the<span class=\"_ _2\"></span> regulator (CREG) as non-controllable expe<span class=\"_ _e\"></span>nses that are recoverable through the regulatory tariffs. The decrease in the carrying<span class=\"_ _2\"></span> value of this asset is disclosed in Note 6.14<span class=\"ff42\">: \u2018Employee benefits\u2019</span> and mainly explained by the change i<span class=\"_ _e\"></span>n discount rate. Considerin<span class=\"_ _2\"></span>g the nature (regulatory asset) of these financi<span class=\"_ _e\"></span>al assets, they are not considered to be at risk o<span class=\"_ _2\"></span>f impairm<span class=\"_ _e\"></span>ent.  Other shareholding<span class=\"_ _2\"></span>s: t<span class=\"ls5b\">he </span>g<span class=\"_ _e\"></span>roup holds 5.3% (at 100%) of the shares in European Energy Exchange (EEX), Leipzig, Germany, for a tot<span class=\"_ _e\"></span>al value of \u20ac42.7<span class=\"_ _2\"></span> million as of the reporting date. These shares are disclosed under Other shareholdings <span class=\"_ _e\"></span><span class=\"ff3f\">in addition to <span class=\"_ _e\"></span>an 8.0% (at 100<span class=\"_ _2\"></span>%) </span>shareholding in<span class=\"_ _2\"></span> JAO Joint Allocation Office SA, a 6.7% (at 100%) shareholding in TSCNET Services GmbH (Munich, Germany) and a<span class=\"_ _e\"></span> 10.4% (at 100%) shareholding<span class=\"_ _2\"></span> in the Stiftung Kurt<span class=\"_ _e\"></span>-Sanderling-Akademie des Konzerthausorchesters foundation (Be<span class=\"_ _e\"></span>rlin, Germany). Other in<span class=\"_ _2\"></span>vestments are measured at fair value. At each reporting date, a re<span class=\"_ _e\"></span>-measurement is performed to re-evaluate these investments. Any deviation from<span class=\"_ _2\"></span> the previous period is recorded under other comprehensive income. T<span class=\"_ _e\"></span>he reassessment 2022 resulted in an increase of \u20ac32.7 million based<span class=\"_ _2\"></span> on a total fair value of \u20ac75.4 million. The remaining balance is related to JAO (\u20ac0.3 million).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Derivatives<span class=\"ls1d\">: s</span>ince 2021, 50Hertz applies hedge a<span class=\"_ _2\"></span>ccounting for the purpose of reducing the risk of fluctuations in the<span class=\"_ _e\"></span> expected amount of grid losses.<span class=\"_ _2\"></span> Due to the drop in energy prices in the last qu<span class=\"_ _e\"></span>arter of the year<span class=\"_ _2\"></span>, the fair value of these contracts decreased t<span class=\"_ _e\"></span><span class=\"ff42\">o \u20ac154.4 million </span>(current derivatives). Lo<span class=\"_ _2\"></span>ng term contracts shows a negative fair value. T<span class=\"_ _e\"></span>his evolution explains an overall decrease of <span class=\"ff42\">\u20ac</span><span class=\"ls5b\">201<span class=\"ls1d\">.3</span></span> million <span class=\"_ _e\"></span>(-\u20ac39.4 million <span class=\"ff3f\">in long-term derivatives and -</span>\u20ac161.9 million <span class=\"ff3f\">in short-term derivatives)<span class=\"ls1d\">. </span>This decrease is partly offset by the positive value </span>accounted for<span class=\"_ _2\"></span> in Belgium in connection with the pre-<span class=\"_ _e\"></span>hedging of probable forecast debt transactions (bonds issuance). The fair value of these derivatives amounted<span class=\"_ _2\"></span> to \u20ac65.3 million. <span class=\"ff3f\">S<span class=\"_ _e\"></span>ee Note 8.1 for more info on these derivatives. </span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.7. <span class=\"_ _87\"> </span>Deferred tax assets and liabilities RECOGNISED DEFERRED TAX ASSETS AND LIA<span class=\"_ _2\"></span>BILITIES<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Assets Liability Assets Liability 25.1 (258.6) 25.2 (245.8) Property, plant <span class=\"_ _2\"></span>and equipment<span class=\"_ _e\"></span> (15.8) (15.4) Intangib<span class=\"_ _2\"></span>le assets<span class=\"_ _e\"></span> 7.4 (62.5) (105.7) Financial a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 1.2 (0.0) 1.3 (0.0) Non-current <span class=\"_ _2\"></span>trade and other receivables<span class=\"_ _e\"></span> 33.9 (5.5) 41.8 (5.6) Intere<span class=\"_ _2\"></span>st-bearing loans and other non-curre<span class=\"_ _e\"></span>nt financial liabilities 19.2 (10.8) 26.7 (11.8) Employee b<span class=\"_ _2\"></span>enefits<span class=\"_ _e\"></span> 36.3 30.2 Provisions 28.2 (1.1) 25.9 (1.5) Deferred re<span class=\"_ _2\"></span>venue 79.4 (76.3) 22.3 Regulator<span class=\"_ _2\"></span>y liabilities<span class=\"_ _e\"></span> (25.3) (1.0) Deferred tax <span class=\"_ _2\"></span>on investment grants<span class=\"_ _e\"></span> 12.6 14.0 Losses carried forward 0.3 (9.5) 0.7 (8.9) Other items 243.6 (465.4) 188.1 (395.8) Tax asset<span class=\"_ _2\"></span>/liability before offsetting<span class=\"_ _e\"></span> (241.8) 241.8 (186.2) 186.2 Offsetting of tax Net tax<span class=\"_ _2\"></span> asset/(liability) 1.<span class=\"ls0\">8 </span>(223.6) 1.9 (209.6) The change<span class=\"_ _2\"></span>s in deferred tax assets and liabilities can be <span class=\"_ _e\"></span>presented as <span class=\"_ _2\"></span>follows:<span class=\"_ _e\"></span> CHANGES IN DEFERRED TAX ASSETS AND LIA<span class=\"_ _2\"></span>BILITIES R<span class=\"_ _e\"></span>ESULTING FROM<span class=\"_ _2\"></span> MOVEMENTS IN TEMPORARY DIFFERENCES DURING THE FINANCIAL YEAR (in \u20ac million)<span class=\"ff40\"> </span>Recognised Recognised in<span class=\"_ _2\"></span> Net tax<span class=\"_ _2\"></span> in income comprehensiv<span class=\"_ _2\"></span>e Oth<span class=\"ls5b\">er</span> Total asset<span class=\"_ _2\"></span>/(liability)<span class=\"_ _e\"></span> state<span class=\"_ _2\"></span>ment<span class=\"_ _e\"></span> income 2021<span class=\"ls0\"> </span>(210.6) (10.4) 0<span class=\"fs8\"> </span>0<span class=\"fs8\"> </span>(221.0) Property, plant <span class=\"_ _2\"></span>and equipment<span class=\"_ _e\"></span> (6.3) (9.1) 0<span class=\"fs8\"> </span>0<span class=\"fs8\"> </span>(15.4) Intangib<span class=\"_ _2\"></span>le assets<span class=\"_ _e\"></span> (105.7) 0<span class=\"fs8\"> </span>(105.7) Financial a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 0.8 0.3 0<span class=\"fs8\"> </span>0<span class=\"fs8\"> </span>1.1 Non-current <span class=\"_ _2\"></span>trade and other receivables<span class=\"_ _e\"></span> Intere<span class=\"_ _2\"></span>st-bearing loans and other non-curre<span class=\"_ _e\"></span>nt financial 27.6 18.9 (0.2) 46.3 liabilities 19.0 2.9 (7.0) 0<span class=\"fs8\"> </span>14.9 Employee b<span class=\"_ _2\"></span>enefits<span class=\"_ _e\"></span> 46.8 (2.2) 0<span class=\"fs8\"> </span>0<span class=\"fs8\"> </span>44.6 Provisions 22.5 (7.8) 0<span class=\"fs8\"> </span>14.6 Deferred re<span class=\"_ _2\"></span>venue 22.6 (0.4) 0<span class=\"fs8\"> </span>0<span class=\"fs8\"> </span>22.2 Regulator<span class=\"_ _2\"></span>y liabilities<span class=\"_ _e\"></span> (1.1) 0<span class=\"fs8\"> </span>0.1 0<span class=\"fs8\"> </span>(1.0) Deferred tax <span class=\"_ _2\"></span>on investment grants<span class=\"_ _e\"></span> 0.8 0.2 0<span class=\"fs8\"> </span>0<span class=\"fs8\"> </span>1.0 Losses carried forward (6.5) (2.8) 0<span class=\"fs8\"> </span>(9.3) Other items Total (84.5) (10.5) (112.8) 0<span class=\"ff40 fs8 fc1c\"> </span>(207.8) 2022<span class=\"ls0\"> </span>(221.0) (13.8) 0 0 (234.8) Property, plant <span class=\"_ _2\"></span>and equipment<span class=\"_ _e\"></span> (15.4) (0.4) 0 0 (15.8) Intangib<span class=\"_ _2\"></span>le assets<span class=\"_ _e\"></span> (105.7) 0 50.6 0 (55.1) Financial a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 1.1 (0.0) 0 0 1.1 Non-current <span class=\"_ _2\"></span>trade and other receivables<span class=\"_ _e\"></span> Intere<span class=\"_ _2\"></span>st-bearing loans and other non-curre<span class=\"_ _e\"></span>nt financial 46.3 (6.9) (0.1) 0 39.3 liabilities 14.9 (1.6) (4.9) 0 8.5 Employee b<span class=\"_ _2\"></span>enefits<span class=\"_ _e\"></span> 44.6 6.1 0 0 50.7 Provisions 14.6 2.6 0 0 17.2 Deferred re<span class=\"_ _2\"></span>venue 22.2 (19.1) 0 0 3.0 Regulator<span class=\"_ _2\"></span>y liabilities<span class=\"_ _e\"></span> (1.0) (0.0) 0 0 (0.1) Deferred tax <span class=\"_ _2\"></span>on investment grants<span class=\"_ _e\"></span> 1.0 0.0 0 0 1.0 Losses carried forward (9.3) (2.4) 0 0 (11.7) Other items Total (207.8) (35.4)<span class=\"ff40 fc1c\"> </span>45.6<span class=\"ff40 fc1c\"> </span>0<span class=\"ff40 fc1c\"> </span>(196.6) The d<span class=\"_ _2\"></span>eferred tax <span class=\"_ _4b\"></span>lia<span class=\"_ _e\"></span>bility on<span class=\"_ _2\"></span> right-<span class=\"ls5b\">of</span>-<span class=\"ff42\">use assets <span class=\"_ _2\"></span>from IFRS 16 <span class=\"_ _4b\"></span>l<span class=\"_ _e\"></span>eases is <span class=\"_ _2\"></span>shown <span class=\"_ _2\"></span>under \u2018Property, <span class=\"_ _2\"></span>plant <span class=\"_ _2\"></span>and equipment\u2019, whilst <span class=\"_ _4b\"></span>the<span class=\"_ _e\"></span> d<span class=\"_ _2\"></span>eferred </span>tax asset on finance lea<span class=\"_ _2\"></span>se liability is shown under \u2019Interest<span class=\"_ _e\"></span><span class=\"ff3f\">-bearing loans and other non-current </span>financial liabilities\u2019.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>UNRECOGNISED DEFERRED TAX ASSETS OR LIABILITIES As at 31 December<span class=\"_ _2\"></span> 2022, the group had unrecognised deferred tax asset<span class=\"ff42\">s for a total of \u20ac</span><span class=\"ls5b\">26</span>.9 <span class=\"_ _e\"></span>million. This amount can be summarized follows: (in \u20ac million)<span class=\"ff40\"> </span>Gross Deferred ta<span class=\"_ _2\"></span>x Tax losses 7.0 1.7 Realto 1.2 0.3 EGI (including<span class=\"_ _2\"></span> branches)<span class=\"_ _e\"></span> 3.0 0.7 Windgrid 2.8 0.7 Dividend rece<span class=\"_ _2\"></span>ived deduction<span class=\"_ _e\"></span> 27<span class=\"ls0\">.1 </span>6.8 Elia Group 21<span class=\"ls0\">.8 </span>5.5 Eurogrid <span class=\"_ _2\"></span>International (BE)<span class=\"_ _e\"></span> 3.0 0.8 EGI 2.3 0.6 Exceeding borrowing cost<span class=\"_ _2\"></span>s 73<span class=\"ls0\">.6 </span>18<span class=\"ls0\">.4 </span>Elia Group 73<span class=\"ls0\">.6 </span>18<span class=\"ls0\">.4 </span>Total<span class=\"fc3\"> </span>107<span class=\"ls0\">.7 </span>26<span class=\"ls0\">.9 </span>These unused tax lo<span class=\"_ _2\"></span>sses carried forward, Di<span class=\"_ _e\"></span>vidend Received Deduction carried forward and non-deductible interests carried forward (Corporate Interest Restr<span class=\"_ _2\"></span>iction rule) have no expiry date. A<span class=\"_ _e\"></span>n assessme<span class=\"_ _2\"></span>nt is conducted <span class=\"_ _e\"></span>each year to determine the probability that <span class=\"_ _2\"></span>these fiscal deduct<span class=\"_ _2\"></span>ions could be used in the future to lower the t<span class=\"_ _e\"></span>ax base. 6.8. <span class=\"_ _87\"> </span>Inventories (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Raw mater<span class=\"_ _2\"></span>ials and consumables<span class=\"_ _e\"></span> 37.4 35.6 Work in pr<span class=\"_ _2\"></span>ogress 0.9 1.9 Write-down<span class=\"_ _2\"></span>s (16.7) (15.9) Total 21.6 21.6 The warehou<span class=\"_ _2\"></span>se primarily stores replacement and spare p<span class=\"_ _e\"></span>arts for maintenance and repair work carried out along the group's high-voltage substation<span class=\"_ _2\"></span>s, overhead lines and underground cables.<span class=\"_ _e\"></span> The va<span class=\"_ _2\"></span>lue of inventories remains stable and limited compared to December 31, 2021.<span class=\"_ _e\"></span> Write-down<span class=\"_ _2\"></span>s are recorded following the non-utilisatio<span class=\"_ _e\"></span>n of stock items based on the<span class=\"_ _2\"></span>ir underlying rotation. These wer<span class=\"_ _e\"></span>e slightly higher than in <span class=\"ls5b\">2021</span>. Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.9. <span class=\"_ _87\"> </span>Current trade and other receivables, deferred charges and accrue<span class=\"_ _2\"></span>d revenues<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Contract assets 0.9 2.9 Trade rece<span class=\"_ _2\"></span>ivables<span class=\"_ _e\"></span> 748.7 716.5 Advance pa<span class=\"_ _2\"></span>yments<span class=\"_ _e\"></span> 1.9 1.0 Levies 80<span class=\"ls0\">.5 </span>36.6 VAT and other t<span class=\"_ _2\"></span>axes<span class=\"_ _e\"></span> 145.6 79.1 Other 2<span class=\"ls5b\">28</span>.7 25.1 Trade and other receiv<span class=\"_ _2\"></span>ables 1,206.2 861.3 Deferred charges 20.2 18.1 Accrued interests 4.9 Deferred charges and<span class=\"_ _2\"></span> accrued revenues<span class=\"_ _e\"></span> 25.1 18.1 Total 1,231.4 879.4 The total current <span class=\"_ _2\"></span>trade and other receivables, deferred charges and <span class=\"ff42\">acc<span class=\"_ _e\"></span>rued revenues increased by \u20ac352.0 million compared with the </span>previous <span class=\"_ _2\"></span>year. This is mainly explained by the cash collateral reported by the German segment for a total of \u20ac239.0 million a<span class=\"_ _e\"></span><span class=\"ff3f\">nd the </span>higher amount of <span class=\"_ _2\"></span>trade receivables and levies in a context of<span class=\"_ _e\"></span> rising prices. Contract assets are ma<span class=\"_ _2\"></span>inly related to<span class=\"_ _e\"></span> EGI's business and transmission system operations. The position decreased from <span class=\"ff42\">\u20ac2.9 million</span> in the previous year <span class=\"ff42\">to \u20ac0.9 million at <span class=\"_ _2\"></span>year<span class=\"ff3f\">-<span class=\"ls5b\">end.<span class=\"_ _e\"></span></span> </span></span>Trade rece<span class=\"_ _2\"></span>ivables are non-interest<span class=\"_ _e\"></span>-bearing and genera<span class=\"_ _2\"></span>lly have payment terms of 15<span class=\"_ _e\"></span> to 30 days. The increase is driven by both Belgian<span class=\"_ _2\"></span> and German<span class=\"_ _2\"></span> segments against a background of high activity and a significant increase in energy prices.<span class=\"_ _e\"></span> The increase in the le<span class=\"_ _2\"></span>vies is mainly attributable to Germany<span class=\"_ _e\"></span> <span class=\"ff42\">where the offshore receivable position rose from \u20ac20.9 million to<span class=\"_ _2\"></span> \u20ac6<span class=\"_ _e\"></span><span class=\"ff3f\">8.9 </span></span>mi<span class=\"ls1c\">ll<span class=\"ls0\">ion at year end in 2022. </span></span>\u2018Other receivab<span class=\"_ _2\"></span>les\u2019 mainly relate to <span class=\"ff3f\">the margin calls <span class=\"ls57\">(a</span>dvances received or paid as part of co<span class=\"_ _2\"></span>llateralization agreeme<span class=\"_ _e\"></span>nts set up by the </span>group<span class=\"_ _2\"></span> to manage counterparty risk on commodity transact<span class=\"_ _e\"></span>ions) of the German segments <span class=\"ff42\">(\u20ac239 million)</span>. The group<span class=\"_ _2\"></span>'s exposure to credit and currency risks, and impairment losses related to trade receivables are shown in Note<span class=\"_ _e\"></span> 8.1. At 31 December, <span class=\"_ _2\"></span>the ageing analysis of trade receiv<span class=\"_ _e\"></span>ables is as follows: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Not past due 639.6 687.4 Past due 0-30 days 75.6 15.1 Past due 3<span class=\"_ _2\"></span>1-60 days<span class=\"_ _e\"></span> 29.3 2.4 Past due 6<span class=\"_ _2\"></span>1 days <span class=\"_ _e\"></span>- one year 1.8 11.1 Past due o<span class=\"_ _2\"></span>ne year - two years 2.8 2.1 Total (e<span class=\"_ _2\"></span>xcl. impairm<span class=\"_ _e\"></span>ent) 749.1 718.1 Doubtful amounts 202.2 201.4 Amounts write-offs (201.7) (200.8) Allowance for e<span class=\"_ _2\"></span>xpected credit losses<span class=\"_ _e\"></span> (0.9) (2.1) Total 748.7 716.5 See Note 8.1 for<span class=\"_ _2\"></span> a detailed analysis of the credit risk incur<span class=\"_ _e\"></span>red in connection with these trade receiva<span class=\"_ _2\"></span>bles.<span class=\"_ _20\"></span> Considerin<span class=\"_ _2\"></span>g the nature (as regulatory assets) and/or the risk profile of the counterparties (Belgian/German state) of the mos<span class=\"_ _e\"></span>t significant other receiva<span class=\"_ _2\"></span>bles, there is a low impairment risk and thus i<span class=\"_ _e\"></span>t is not needed<span class=\"_ _2\"></span> to record a loss allowance.<span class=\"_ _e\"></span><span class=\"ff40\"> </span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.10. <span class=\"_ _92\"> </span>Current t<span class=\"_ _e\"></span>ax assets and liabilities (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Tax re<span class=\"_ _2\"></span>ceivables<span class=\"_ _e\"></span> 28.6 10.1 Tax liabilities (26.6) (26.8) Net tax<span class=\"_ _2\"></span> asset/(liability) 1.9 (16.7) Tax re<span class=\"_ _2\"></span>ceivables increased compared with the previous year. Th<span class=\"ff42\">e \u20ac28.6 million</span> income<span class=\"_ _e\"></span> tax receivables recorded on 31 December 2022 mainly re<span class=\"_ _2\"></span>lates to advances on corporate <span class=\"_ _e\"></span>tax to be recovered in the finan<span class=\"_ _2\"></span>cial year 2023<span class=\"ls95\">. </span>Income tax <span class=\"_ _2\"></span>liabilities remained stable <span class=\"ff42\">at \u20ac26.6 </span>million. Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.11. <span class=\"_ _92\"> </span>Cash<span class=\"_ _e\"></span> and cash equivalents (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Short-term deposits 3,516.6 2,486.2 Balance at bank 634.6 563.2 Total 4,151.2 3,049.5 Cash and cash <span class=\"ff42\">equivalents increa<span class=\"_ _2\"></span>sed by \u20ac<span class=\"ff3f\">1,10<span class=\"_ _e\"></span>1.7 million. This increase was mainly due to the higher EEG, KWK a<span class=\"_ _e\"></span>nd Strom<span class=\"_ _2\"></span>NEV </span></span>(levies) <span class=\"ff42\">surplus o<span class=\"_ _2\"></span>f \u20ac2,884.6 million (+\u20ac752,5 million) in Germany and the capital increased completed by the Group.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>Short-term deposits are inve<span class=\"_ _2\"></span>sted for periods varying from a few days or weeks to several months (generally not exceeding three months), depending on<span class=\"_ _2\"></span> immediate cash requirements, an<span class=\"_ _e\"></span>d earn interest in a<span class=\"_ _2\"></span>ccordance with the interest<span class=\"_ _e\"></span> rates for short-term deposits.<span class=\"fc1d\"> </span>Bank account balances earn or pay in<span class=\"_ _2\"></span>terest in line with th<span class=\"_ _e\"></span>e variable rate<span class=\"_ _2\"></span>s of interest on the basis of daily ba<span class=\"_ _e\"></span>nk depo<span class=\"_ _e\"></span>sit interest<span class=\"_ _2\"></span> rates. The group<span class=\"_ _2\"></span>'s interest rate risk and the sensitivity analysis for financial assets and liabilities are discussed in Note 8.2.<span class=\"_ _e\"></span> The ca<span class=\"_ _2\"></span>sh and cash equivalents disclosed above and in the statement of cash flows include <span class=\"_ _e\"></span><span class=\"ff42\">restricted cash for a total of \u20ac2,936.0</span> million held by 50Hertz Transmission<span class=\"_ _2\"></span> GmbH an<span class=\"_ _e\"></span>d <span class=\"ff42 ls5b\">\u20ac1.</span>4 million hel<span class=\"_ _e\"></span>d by Elia Re.<span class=\"fc1d\"> </span>Erreur <span class=\"ls103\">! </span>S<span class=\"_ _2\"></span>ignet non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.12. <span class=\"_ _92\"> </span><span class=\"ff43\">Shareho<span class=\"_ _e\"></span>lders\u2019 equity</span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.12.1. <span class=\"_\"> </span>Equity attributable to the owners <span class=\"_ _2\"></span>of the Com<span class=\"_ _2\"></span>pany<span class=\"_ _e\"></span> SHARE C<span class=\"_ _e\"></span>APITAL AND S<span class=\"_ _2\"></span>HARE PREMIUM Number of shares 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Number<span class=\"_ _2\"></span> of issued shares at the beginning of the year<span class=\"_ _e\"></span> 68,728<span class=\"_ _2\"></span>,055<span class=\"_ _e\"></span> 68,720<span class=\"_ _2\"></span>,695<span class=\"_ _e\"></span> Issued against ca<span class=\"_ _2\"></span>sh payment<span class=\"_ _e\"></span> 4,787,784 7,360 Number of i<span class=\"_ _2\"></span>ssued shares at the end of the year<span class=\"_ _e\"></span> 73,515<span class=\"_ _2\"></span>,839<span class=\"_ _e\"></span> 68,728<span class=\"_ _2\"></span>,055<span class=\"_ _e\"></span> Number<span class=\"_ _2\"></span> of treasury shares at the end of the year<span class=\"_ _e\"></span> 13,480 7,248 Number of outstanding<span class=\"_ _2\"></span> shares at the end of the year 73,502<span class=\"_ _2\"></span>,359<span class=\"_ _e\"></span> 68,720<span class=\"_ _2\"></span>,807<span class=\"_ _e\"></span> The capital ha<span class=\"_ _2\"></span>s been modified twice d<span class=\"_ _e\"></span>uring the year 2022<span class=\"ls1d\">: </span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">On 24<span class=\"_ _2\"></span> June 2022, Elia Group SA/NV successfully completed a public offering of new shares <span class=\"_ _2\"></span>to existing shareholder<span class=\"_ _e\"></span>s and an<span class=\"_ _2\"></span>y </span></span>holders of an<span class=\"_ _2\"></span> extra-legal preferential right. Through this offering, the capital of Elia Group SA/NV has increase<span class=\"_ _e\"></span>d by an amount of \u20ac118.2<span class=\"_ _2\"></span> million along with an increase in share premium of<span class=\"_ _e\"></span> \u20ac471.9 million f<span class=\"_ _2\"></span>or which 4.739.865 new shares have bee<span class=\"_ _e\"></span>n issued at a<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>subscription price<span class=\"_ _2\"></span> of \u20ac124.5 per share. \u20ac6.9 million of costs were incurred in relation to the capital increas<span class=\"_ _e\"></span><span class=\"ff3f\">e.  </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> extraordinary shareholders' meeting held on 21 June<span class=\"_ _e\"></span> 2022 decided<span class=\"_ _2\"></span> to execute a capital increase in two steps/periods (one in </span></span>2022 for a maximum of <span class=\"_ _2\"></span>\u20ac5.0<span class=\"ff3f\"> </span>million and the other in 2023 <span class=\"_ _e\"></span>for a maximum of \u20ac1.0<span class=\"ff3f\"> </span>million), for a total maximum amount of \u20ac6.0 million for<span class=\"_ _2\"></span> its Belgian employees. Th<span class=\"_ _e\"></span>e first tranche of this capital increase for employees took place in December 2022. The transact<span class=\"_ _2\"></span>ion resulted in the creation of 47,920 new shares for a total amount of \u20ac5.0 million, consisting of <span class=\"ff3f ls5b\">a </span>\u20ac<span class=\"_ _e\"></span>1.2 million <span class=\"ff3f\">capital </span>increase and a \u20ac3.8<span class=\"_ _2\"></span> million increa<span class=\"ff3f\">se in<span class=\"_ _e\"></span> share premium. </span>In 2021, the<span class=\"_ _2\"></span> movement was related to the sec<span class=\"_ _e\"></span>ond tranche of the 2020 capital increase for Elia employees completed in March 2021. Th<span class=\"ls1c\">is<span class=\"ls0\"> capital increase resulted in the creation of 7,360 additional shares without nominal value for a total amount of 0<span class=\"_ _e\"></span>.2 million capital </span></span>increase and a \u20ac0.4<span class=\"ff3f\"> million increase in share pr<span class=\"_ _2\"></span>emium.<span class=\"_ _e\"></span> </span>RESERVES <span class=\"_ _74\"> </span> In line with Belg<span class=\"_ _2\"></span>ian legislation, 5% of the Company's statu<span class=\"_ _e\"></span>tory net pro<span class=\"_ _2\"></span>fit must be transferred to the legal reserve each year <span class=\"_ _e\"></span>until the legal reserve<span class=\"_ _2\"></span> represents 10% of the capital. As at 31 Decembe<span class=\"_ _e\"></span>r 2022<span class=\"ls1d\">, </span><span class=\"ff42\">the Group's legal reserve amounts to \u20ac180.2</span> milli<span class=\"_ _e\"></span>on and<span class=\"_ _2\"></span> represents 9.8% of the<span class=\"_ _2\"></span> capital.<span class=\"_ _e\"></span> The Board of <span class=\"_ _2\"></span>Directors can propose the pay-<span class=\"_ _e\"></span>out of a dividend to shareholders totalling up to a maximum of the available reserves plus the profit carried f<span class=\"_ _2\"></span>orward from <span class=\"ff42\">the Company\u2019s </span>previ<span class=\"_ _e\"></span>ous financial year<span class=\"_ _2\"></span>s, including the profit <span class=\"_ _e\"></span>for the financial year ending on <span class=\"ls78\">31<span class=\"_ _2\"></span><span class=\"ls0\"> December </span></span>2022<span class=\"ls0\">. Shareholders must approve the dividend payment <span class=\"_ _e\"></span>at the Annual Ge<span class=\"_ _2\"></span>neral Meeting of Shareholders.<span class=\"_ _e\"></span> </span>HEDGING RESERVE <span class=\"_ _139\"> </span> The hedging reserve compr<span class=\"_ _2\"></span>ises the effective portion of the cumulative net change in fair value of cash flow hedgin<span class=\"_ _e\"></span>g instruments with regard to hedged tr<span class=\"_ _2\"></span>ansactions that have not yet occurred.<span class=\"_ _e\"></span> Since 2021, hedge acco<span class=\"_ _2\"></span>unting is applied to future contracts entered into by 50Hertz for the purpose of reducing the risk of fluct<span class=\"_ _e\"></span>uations in the expe<span class=\"_ _2\"></span>cted amount of grid losses. The fair value of these contracts amounted to \u20ac129.6 million at the end of 2022 <span class=\"_ _e\"></span>(\u20ac355.6 million in 2021)<span class=\"_ _2\"></span>. Considering a deferred tax effect, a net variation of the hedge reserve amounting to -<span class=\"_ _e\"></span><span class=\"ff42\">\u20ac159.1 million was recorded in other </span>comprehensive<span class=\"_ _2\"></span> income in 2022. This negative impact was driven by the drop in energy prices in the last quart<span class=\"_ _e\"></span>er of <span class=\"_ _e\"></span>the year and<span class=\"_ _2\"></span> was partly off<span class=\"_ _2\"></span>set by the new derivatives in which Elia Transmissi<span class=\"_ _e\"></span>on Belgium SA/NV ente<span class=\"_ _2\"></span>red into in 2022 for the pre<span class=\"_ _e\"></span>-hedg<span class=\"_ _e\"></span>ing of probable forecasted debt transactions. T<span class=\"_ _2\"></span>he fair value of these derivatives was \u20ac65.3 million at the end of the<span class=\"ff3f\"> yea<span class=\"_ _e\"></span>r 2022, resulting in a net hedging </span>reserve<span class=\"_ _2\"></span> of \u20ac49.0 million fully recognized in other comprehensive income.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>As the costs for gr<span class=\"_ _2\"></span>id losses are almost fully passed through to the tariffs, the fair value of the future contracts has no re<span class=\"_ _e\"></span>levance for the curren<span class=\"_ _2\"></span>t or future profitability of the company.<span class=\"_ _e\"></span> TREASUR<span class=\"_ _e\"></span>Y SHARES The reserve for <span class=\"_ _e\"></span>the Compa<span class=\"_ _e\"></span>ny\u2019s treasury sha<span class=\"_ _e\"></span>res comprise<span class=\"_ _e\"></span>s the cost <span class=\"_ _e\"></span>of th<span class=\"_ _20\"></span>e Company\u2019s shares <span class=\"_ _e\"></span>held by t<span class=\"_ _e\"></span>he g<span class=\"_ _e\"></span><span class=\"ff3f\">roup. <span class=\"ls95\">On</span> 31 December 2<span class=\"_ _e\"></span>021, </span>the group held 7.248 <span class=\"ff42\">of the Compan<span class=\"_ _2\"></span>y\u2019s shares.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>Number of t<span class=\"_ _2\"></span>reasury shares<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>On 1 January 7,248 0 Repurcha<span class=\"_ _2\"></span>sed during the year<span class=\"_ _e\"></span> 452,289<span class=\"fs8\"> </span>270,331 Sold during<span class=\"_ _2\"></span> the year<span class=\"_ _e\"></span> -446,057<span class=\"fs8\"> </span>-263,083 Number of t<span class=\"_ _2\"></span>reasury shares at the end of the year<span class=\"_ _e\"></span> 13,480 7,248 SHARE-BASED <span class=\"_ _e\"></span>PAYMENTS At 31 <span class=\"_ _e\"></span>May 2021, E<span class=\"_ _e\"></span>urogrid International <span class=\"_ _e\"></span>SA/NV<span class=\"_ _e\"></span><span class=\"ff40\"> </span>h<span class=\"_ _e\"></span>as grant<span class=\"_ _e\"></span>ed 1,640 st<span class=\"_ _e\"></span>ock options <span class=\"_ _e\"></span>to <span class=\"_ _e\"></span>the e<span class=\"_ _e\"></span>mployees of R<span class=\"_ _e\"></span>ealTo BV<span class=\"_ _e\"></span>/SRL and RealTo <span class=\"_ _e\"></span>GmbH at a str<span class=\"_ _2\"></span>ike price of \u20ac100 per stock option at exercise date 31 Mar<span class=\"_ _2\"></span>ch 2024. <span class=\"ff3f\">A<span class=\"_ _e\"></span>s per 14 March 2023, 500 additional stock options have been </span>granted <span class=\"_ _2\"></span>to new <span class=\"_ _2\"></span>employees at <span class=\"_ _2\"></span>the same terms <span class=\"_ _2\"></span>and conditions. In <span class=\"_ _2\"></span>total, 2,1<span class=\"ff42\">20 sto<span class=\"_ _2\"></span>ck options have b<span class=\"_ _2\"></span>een a<span class=\"_ _2\"></span>ccepted, worth \u20ac1,<span class=\"ff3f\">4 million. As pe<span class=\"_ _2\"></span>r </span></span>31 December 2022, 1.140 options ar<span class=\"_ _e\"></span>e still living. T<span class=\"_ _e\"></span>he share-based <span class=\"_ _e\"></span>payments cost amounted to <span class=\"_ _e\"></span><span class=\"ff42 ls5b\">\u20ac0.</span>3<span class=\"_ _e\"></span> million in 202<span class=\"ff42\">2<span class=\"_ _e\"></span> (\u20ac0.2 million)</span>. As<span class=\"_ _e\"></span> the stock option <span class=\"_ _e\"></span>plan<span class=\"_ _e\"></span> concerns <span class=\"_ _e\"></span>shar<span class=\"_ _e\"></span>es in<span class=\"_ _e\"></span> RealTo <span class=\"_ _e\"></span>BV/SR<span class=\"_ _e\"></span>L a<span class=\"_ _e\"></span>nd <span class=\"_ _e\"></span>its <span class=\"_ _e\"></span>parent c<span class=\"_ _e\"></span>ompany, t<span class=\"_ _e\"></span>he s<span class=\"_ _e\"></span>hare<span class=\"_ _20\"></span>-b<span class=\"_ _2\"></span>ased <span class=\"_ _e\"></span>payments <span class=\"_ _e\"></span>are <span class=\"_ _e\"></span>not <span class=\"_ _e\"></span>presented <span class=\"_ _e\"></span>separately in the sta<span class=\"_ _2\"></span>tement of equity.    DIVIDEND After the reporting<span class=\"_ _2\"></span> date, the Board of Directors will put forw<span class=\"_ _e\"></span>ard th<span class=\"_ _2\"></span>e dividend<span class=\"_ _e\"></span> proposal outlined belo<span class=\"ls1c\">w.</span> Dividend (<span class=\"_ _2\"></span>in \u20ac)<span class=\"_ _e\"></span><span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Per ordinary sh<span class=\"_ _2\"></span>are entitled to dividend<span class=\"_ _e\"></span> 1.91 1.75 It was proposed<span class=\"_ _2\"></span> and approved, at the Shareholders\u2019 Meeting convened to approve the Elia Group <span class=\"ff3f\">SA/NV<span class=\"_ _e\"></span> financial statements for the </span>year ended 31 December 202<span class=\"ls78\">1,<span class=\"_ _2\"></span><span class=\"ls0\"> <span class=\"ff42\">to pay a d<span class=\"_ _2\"></span>ividend of \u20ac1.<span class=\"ff3f ls78\">75<span class=\"ls0\"> per share, representing a total payout of </span></span>\u20ac<span class=\"ff3f\">120.3 million. </span></span></span></span>The Board of <span class=\"_ _2\"></span>Directors meeting on <span class=\"ls5b\">30</span> M<span class=\"_ _e\"></span>arch 2023 <span class=\"ls5b\">pr</span><span class=\"ff42\">opos<span class=\"_ _e\"></span>ed a gross dividend of \u20ac1.</span><span class=\"ls78\">91<span class=\"_ _2\"></span><span class=\"ls0\"> per share with regard to 2022. This dividend is </span></span>subject to approval by <span class=\"_ _2\"></span>shareholders at the Annual General Meeting on 1<span class=\"_ _e\"></span>6 May 2023 and is not included as a liability in the Gr<span class=\"ff42\">oup\u2019s </span>consolidated fina<span class=\"_ _2\"></span>ncial statements. The total dividend, ca<span class=\"_ _2\"></span>lculated based on the number of shares outstanding on <span class=\"_ _e\"></span><span class=\"ls5b\">30</span> March 2023 corresponds to a total of <span class=\"ff42\">\u20ac</span>140.4<span class=\"_ _2\"></span> million. Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.12.2. <span class=\"_\"> </span>Hy<span class=\"_ _2\"></span>brid secu<span class=\"_ _e\"></span>rities In September 2018<span class=\"_ _2\"></span>, the group issued hybrid securities to <span class=\"_ _e\"></span>finance the additional 20% stake in 50Hertz Transmission (Germany)<span class=\"_ _2\"></span>. The issue resu<span class=\"_ _2\"></span>lted in a <span class=\"ff42\">\u20ac700 million</span> <span class=\"ff42\">inc<span class=\"_ _e\"></span>rease in the group\u2019s equity.</span> The h<span class=\"_ _2\"></span>ybrid securities bear an optional, cumulative coup<span class=\"_ _e\"></span>on of 2.75%, payable at the g<span class=\"ff42\">roup\u2019s discretion annually on 5 December of each </span>year, with the first payment on 5 December 2019<span class=\"fc1d ls1d\">. </span>As at 31 December 2022, the unpaid cumulative dividend amounted <span class=\"ff42\">to \u20ac1.4 million. </span>(2021<span class=\"_ _2\"></span><span class=\"ls95\">: <span class=\"ff42 ls0\">\u20ac1<span class=\"_ _2\"></span>.4 million). A coupon of \u20ac19.3 million <span class=\"ff3f\">was paid t<span class=\"_ _e\"></span>o the holders of hybrid securities in December 2022. </span></span></span>The h<span class=\"_ _2\"></span>ybrid securities have an initial call date in December 2023, with<span class=\"_ _e\"></span> a reset every five years thereafter.<span class=\"_ _e\"></span> The h<span class=\"_ _2\"></span>ybrid securities are structured as perpetual instrume<span class=\"_ _e\"></span>nts, have junior ranking to all senior debt and are recorde<span class=\"_ _e\"></span>d as equ<span class=\"_ _2\"></span>ity in the group<span class=\"_ _2\"></span><span class=\"ff42\">\u2019s accounts pursuant to IFRS.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.13. <span class=\"_ _92\"> </span>Int<span class=\"_ _e\"></span>erest-bearing loans, borrowings and lease liabilities (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Non-current borrowings 7,638.6 7,658.2 Lease liab<span class=\"_ _2\"></span>ilities \u2212<span class=\"ff3f\"> non-current </span>77.0 83.7 Subtotal non-cu<span class=\"_ _2\"></span>rrent borr<span class=\"_ _e\"></span>owings 7,715.6 7,741.7 Curren<span class=\"_ _2\"></span>t borrowings<span class=\"_ _e\"></span> 772.0 82.3 Lease liab<span class=\"_ _2\"></span>ilities \u2212 current<span class=\"ff3f\"> </span>13.2 35.1 Accrued interest 81.9 76.4 Subtotal current loan<span class=\"_ _2\"></span>s and borr<span class=\"_ _e\"></span>owings 867.2 194.0 Total 8,582.8 7,935.7 The tables be<span class=\"_ _2\"></span>low show the changes in the g<span class=\"_ _e\"></span>roup's liabilities arising from financing activities, in<span class=\"_ _2\"></span>cluding changes arising from <span class=\"_ _e\"></span>both cash flows and non-cash changes. Non-current interest-Current interest-bearing loans (in \u20ac million)<span class=\"ff40\"> </span>bearing loans and<span class=\"_ _2\"></span> Total and borrowings borrowings Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 805.5 7,249.6 8,055.1 Cash flow: r<span class=\"_ _2\"></span>epayment of borrowings<span class=\"_ _e\"></span> (722.3) (15.4) (737.7) Cash flow: procee<span class=\"_ _2\"></span>ds from withdrawal borrowings<span class=\"_ _e\"></span> 60.0 498.0 558.0 Accrued interest 5.4 0.0 5.4 Other 45.4 9.5 54.9 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 193.9 7,741.7 7,935.7 Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 193.9 7,741.7 7,935.7 Cash flow: r<span class=\"_ _2\"></span>epayment of borrowings<span class=\"_ _e\"></span> (82.3) (13.3) (95.8) Cash flow: procee<span class=\"_ _2\"></span>ds from withdrawal borrowings<span class=\"_ _e\"></span> 0.0 747.4 747.4 Accrued interest 5.5 0.2<span class=\"fs8\"> </span>5.7 Other 750.2 (760.4) (10.2) Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 867.2 7,715.6 8,582.8 During the year 2021, th<span class=\"_ _2\"></span>e group (Eu<span class=\"_ _e\"></span>rogrid GmbH) paid back <span class=\"ff42\">the revolving credit facilities (\u20ac700 million) that were temporarily contracted </span>to finance the EEG d<span class=\"_ _2\"></span>eficit at the end of 2020. Elia Group had issu<span class=\"ff42\">ed an Eurobond of \u20ac500.0 million with maturity date 2033 and an </span>interest rate<span class=\"_ _2\"></span> of 0.88%. The group also <span class=\"ff42\">iss<span class=\"_ _e\"></span>ued commercial papers for total amount of \u20ac60.0 m<span class=\"_ _2\"></span>illion with <span class=\"_ _e\"></span><span class=\"ff3f\">maturity date 2022 and an </span></span>interest rate <span class=\"ls5b\">of</span> -<span class=\"ff42\">0.15% under its commercial paper program of \u20ac</span>300.0 million.<span class=\"_ _e\"></span> In 2022, Eurogrid GmbH ha<span class=\"_ _2\"></span>s secured liquidity for the further grid expansion necessary for the energy transition with the issu<span class=\"_ _e\"></span>ance of a \u00e9<span class=\"ff42\">second Green Bond in<span class=\"_ _2\"></span> the amount of \u20ac750.0 million at a rate of 3.279% and a term of nine years. Repayment<span class=\"ff3f\">s<span class=\"_ _e\"></span> of borrowing 2022 </span></span>mainly re<span class=\"_ _2\"></span>late to the closing of the commercial paper program (-<span class=\"ff42\">\u20ac60.0 million) <span class=\"_ _e\"></span></span><span class=\"ls5b\">and </span>the capital repayment of the <span class=\"ff42\">amor<span class=\"_ _e\"></span>tizing loans (\u20ac22.0 </span>million). Movements in 'Other' during the financia<span class=\"_ _2\"></span>l year 2022 <span class=\"_ _e\"></span>mainly relates to reclassifications of long-term debt to short-term debt based on when instrumen<span class=\"_ _2\"></span>ts become due in 2023.<span class=\"_ _e\"></span> Information <span class=\"ls78\">on<span class=\"_ _4b\"></span><span class=\"ls0\"> the<span class=\"_ _e\"></span> terms and conditions of outstanding interest-bearing loans and borrowings is outlined below: </span></span>As per 31 De<span class=\"_ _2\"></span>cember 202<span class=\"ls5b\">2:<span class=\"_ _e\"></span></span> Redemption (in \u20ac million)<span class=\"ff40\"> </span>Matu<span class=\"_ _2\"></span>rity<span class=\"_ _e\"></span> Amount Interest rate schedule Eurobond issues 2013/15 years 2028<span class=\"ls0\"> </span>At maturity 548.0 3.25% Eurobond issues 2013/20 years 2033<span class=\"ls0\"> </span>At maturity 199.3 3.50% Eurobond issues 2014/15 years 2029<span class=\"ls0\"> </span>At maturity 347.6 3.00% Eurobond issues 2015/8.5 years 2024<span class=\"ls0\"> </span>At maturity 499.6 1.38% Eurobond issues 2017/10 years 2027<span class=\"ls0\"> </span>At maturity 248.5 1.38% Senior bo<span class=\"_ _2\"></span>nd 2018/10 years 2028<span class=\"ls0\"> </span>At maturity 298.3 1.50% Eurobond issues 2019/7 year<span class=\"_ _2\"></span>s 2026<span class=\"ls0\"> </span>At maturity 499.0 1.38% Eurobond issues 2020/10 years 2030<span class=\"ls0\"> </span>At maturity 790.9 0.88% Amortising term loan 2033<span class=\"ls0\"> </span>Linear 167.8 1.80% Amortising bond - 7,7 years 2028<span class=\"ls0\"> </span>Linear 50.3 1.56% Amortising bond - 23,7 years 2044<span class=\"ls0\"> </span>Linear 132.4 1.56% European Investment <span class=\"_ _2\"></span>Bank<span class=\"_ _e\"></span> 2025<span class=\"ls0\"> </span>At maturity 100.0 1.08% Commer<span class=\"_ _2\"></span>cial Paper<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>At maturity 0.0 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2025<span class=\"ls0\"> </span>At maturity 499.0 1.875% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2015 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2023<span class=\"ls0\"> </span>At maturity 749.7 1.625% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2015 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2030<span class=\"ls0\"> </span>At maturity 139.4 2.625% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2015 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2028<span class=\"ls0\"> </span>At maturity 748.0 1.500% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2016 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2032<span class=\"ls0\"> </span>At maturity 747.7 1.113% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2020 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2031<span class=\"ls0\"> </span>At maturity 747.4 3,279% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Programme 2021 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2040<span class=\"ls0\"> </span>At maturity 199.5 0,875% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Programme 2020 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2033<span class=\"ls0\"> </span>At maturity 498.3 0,741% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Programme 2021 Registered bond 2014 2044<span class=\"ls0\"> </span>At maturity 50.0 3,000% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Loan with KF<span class=\"_ _2\"></span>W<span class=\"_ _e\"></span> 2026<span class=\"ls0\"> </span>At maturity 150.0 0.90% Total 8,410.7 Lease debts 90.2 Accrued interests 81.9 Total Loan<span class=\"_ _2\"></span>s and Borrowings 8,582.8 (Current and Non-current) As per 31 De<span class=\"_ _2\"></span>cember 2021:<span class=\"_ _e\"></span> Redemption (in \u20ac million)<span class=\"ff40\"> </span>Matu<span class=\"_ _2\"></span>rity<span class=\"_ _e\"></span> Amount Interest rate schedule Eurobond issues 2013/15 years 2028<span class=\"ls0\"> </span>At maturity 547.7 3.25% Eurobond issues 2013/20 years 2033<span class=\"ls0\"> </span>At maturity 199.2 3.50% Eurobond issues 2014/15 years 2029<span class=\"ls0\"> </span>At maturity 347.2 3.00% Eurobond issues 2015/8.5 years 2024<span class=\"ls0\"> </span>At maturity 499.1 1.38% Eurobond issues 2017/10 years 2027<span class=\"ls0\"> </span>At maturity 248.2 1.38% Senior bo<span class=\"_ _2\"></span>nd 2018/10 years 2028<span class=\"ls0\"> </span>At maturity 297.9 1.50% Eurobond issues 2019/7 years 2026<span class=\"ls0\"> </span>At maturity 498.6 1.38% Eurobond issues 2020/10 years 2030<span class=\"ls0\"> </span>At maturity 789.7 0.88% Amortising term loan 2033<span class=\"ls0\"> </span>Linear 181.7 1.80% Amortising bond - 7,7 years 2028<span class=\"ls0\"> </span>Linear 58.7 1.56% Amortising bond - 23,7 years 2044<span class=\"ls0\"> </span>Linear 132.3 1.56% European Investment <span class=\"_ _2\"></span>Bank<span class=\"_ _e\"></span> 2025<span class=\"ls0\"> </span>At maturity 100.0 1.08% Commer<span class=\"_ _2\"></span>cial Paper<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>At maturity 60.0 -0.15% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2015<span class=\"_ _e\"></span> 2025<span class=\"ls0\"> </span>At maturity 498.6 1.88% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2015<span class=\"_ _e\"></span> 2023<span class=\"ls0\"> </span>At maturity 749.4 1.63% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2015<span class=\"_ _e\"></span> 2030<span class=\"ls0\"> </span>At maturity 139.3 2.63% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2016<span class=\"_ _e\"></span> 2028<span class=\"ls0\"> </span>At maturity 747.7 1.50% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2020<span class=\"_ _e\"></span> 2032<span class=\"ls0\"> </span>At maturity 747.4 1.11% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2020<span class=\"_ _e\"></span> 2040<span class=\"ls0\"> </span>At maturity 199.4 0.88% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2021<span class=\"_ _e\"></span> 2033<span class=\"ls0\"> </span>At maturity 498.1 0.88% Registered bond 2014 2044<span class=\"ls0\"> </span>At maturity 50.0 3.00% Loan with KfW 2026<span class=\"ls0\"> </span>At maturity 150.0 0.90% Total 7,740.5 Lease debts 118.8 Accrued interests 76.4 Total Loan<span class=\"_ _2\"></span>s and Borrowings (Current and Non-curr<span class=\"_ _e\"></span>ent) 7,935.7 Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.14. <span class=\"_ _92\"> </span>Employee ben<span class=\"_ _e\"></span>efits The group<span class=\"_ _2\"></span> has various legal and constructive defined ben<span class=\"_ _e\"></span>efit obligations linked<span class=\"_ _2\"></span> to its Belgian and German operations.<span class=\"_ _e\"></span> The total ne<span class=\"_ _2\"></span>t liability for employee-benefit obligations is a<span class=\"_ _e\"></span>s follows: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany Total Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany Total Defined benefit p<span class=\"_ _2\"></span>lans<span class=\"_ _e\"></span> 4.3 20.9 25.1 28.6 34.0 62.6 Post-emplo<span class=\"_ _2\"></span>yment benefits other than pensions<span class=\"_ _e\"></span> 47.6 4.3 51.9 36.2 7.9 44.0 Subtotal 51.9 25.2 77.1 64.8 41.8 106.6 Other (non actuar<span class=\"_ _2\"></span>ial provision)<span class=\"_ _e\"></span> 1.0 1.0 0.0 Total prov<span class=\"_ _2\"></span>isions for employee benefits 51.9 26.2 78.1 64.8 41.8 106.6 Of the \u20ac<span class=\"ff3f\">78.1 million in employe<span class=\"_ _2\"></span>e benefits pr<span class=\"_ _e\"></span>ovisions recognised at the end of the financial year 2022<span class=\"ff42 ls1d\">, \u20ac</span>75.0 million <span class=\"_ _e\"></span>is presented in the </span>long term and \u20ac<span class=\"ff3f\">3.2 million in the short term (see Note 6.14<span class=\"ls8f\">).</span> </span>BELGIUM DEFINED-CONTRIBUTION PLAN Employees remunera<span class=\"_ _2\"></span>ted based on a salary scale and rec<span class=\"_ _e\"></span>ruited after<span class=\"_ _2\"></span> 1 June 2002, as well as management staff recruited after 1<span class=\"_ _e\"></span> May 1999 are co<span class=\"_ _2\"></span>vered by two defined-contribution pension plans (Powerbel and Enerbel): <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> Enerbel plan is a plan for<span class=\"ff40\"> </span>salaried employees hired after 1 June 2002, to which the employee and the employer contribute </span></span>based on predefined formula<span class=\"_ _2\"></span>.  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> Powerbel plan is a plan for managers hired after 1 May 1999. The contributions of the employee and employer are based on </span></span>a fixed <span class=\"ff42\">percen<span class=\"_ _2\"></span>tage of the employee\u2019s salary. <span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>The new law regard<span class=\"_ _2\"></span>ing occupational pension plans, published at the end of 2015, made various changes to t<span class=\"_ _e\"></span>he guaranteed return on defined-contr<span class=\"_ _2\"></span>ibution plans. For payments made after 1 January 2016, the law requires emp<span class=\"_ _e\"></span>loyers to guarantee an average annual return of at lea<span class=\"_ _2\"></span>st 1.75% (up to 3.75% depending on who contributes) over the course of <span class=\"_ _e\"></span><span class=\"ff42\">each employee\u2019s career.</span> For insured<span class=\"_ _2\"></span> plans the minimum guaranteed return until 31<span class=\"_ _e\"></span> December 2015 still ne<span class=\"_ _2\"></span>eds to be equivalent to at le<span class=\"_ _e\"></span>ast 3.25% for the employer\u2019s contr<span class=\"_ _2\"></span>ibution and 3.75% for the employee's contribution, with any shortfall<span class=\"_ _e\"></span><span class=\"ff3f\"> being covered by the employer.<span class=\"_ _e\"></span> </span>As a result o<span class=\"_ _2\"></span>f the above changes and as mentioned in the<span class=\"_ _e\"></span> accounting policies, all defined-contribution pension plans under Belgian pension legislation are classified as defined-benefit plans for accounting purposes, due to the legal minimum return to be guaranteed by the employer<span class=\"_ _2\"></span>, which represents a plan amendment. They <span class=\"_ _e\"></span>are accounted for using the Projected Unit Credit method <span class=\"_ _e\"></span>(PUC-method). For each plan, the<span class=\"_ _2\"></span> fair value of assets equals the sum of the accrued individual reserves (if any) and the value of the collectiv<span class=\"_ _20\"></span>e fu<span class=\"_ _2\"></span>nd(s) (if any), hence no ap<span class=\"_ _2\"></span>plication of IAS 19 \u00a7 115. In addition, with the exception of Enerbel, the <span class=\"_ _e\"></span>defi<span class=\"ls5b\">ned</span>-c<span class=\"_ _e\"></span>ontributions (<span class=\"ls1c\">DC</span>) plans are not backloaded, as su<span class=\"_ _2\"></span>ch these plans are valued without projection of future contributions. The Enerbel DC plan is backloaded and <span class=\"_ _e\"></span>this plan is valued with proje<span class=\"_ _2\"></span>ction of future contributions<span class=\"_ _e\"></span>.<span class=\"fs11\">  </span>Elia Transm<span class=\"_ _2\"></span>ission Belgium has transferred certain acquired reserves guaranteed by the insurers to 'Cash balance <span class=\"_ _20\"></span><span class=\"ff42\">\u2013</span> b<span class=\"_ _2\"></span>est of' plans since 2016. The main objective o<span class=\"_ _2\"></span>f these plans is to guarantee for every subscriber a minimum guaranteed return of 3.25% on the acquired reserve<span class=\"_ _2\"></span>s until retirement age. <span class=\"_ _e\"></span> Both emplo<span class=\"_ _2\"></span>yee' and employer' contributions are paid on a monthly basis for the base plans. The employee' contribution is dedu<span class=\"_ _e\"></span>cted from the<span class=\"ls1c\">ir</span> <span class=\"_ _2\"></span>salary and paid to the insurer by the employer. The amount of future cash flows <span class=\"_ _e\"></span>depends on wage growth. DEFINED-BENEFIT PLANS For a<span class=\"_ _2\"></span> closed population, collective agreements in the electricity and gas industries provide \u2018pension supplements\u2019 based on t<span class=\"_ _e\"></span><span class=\"ff3f\">he annual </span>salary and an emplo<span class=\"_ _2\"></span>yee\u2019s career within a company (partial<span class=\"_ _e\"></span>ly revertib<span class=\"_ _2\"></span>l<span class=\"ff3f\">e<span class=\"_ _e\"></span> to the inheritor in case of early death of the employee).The </span>benefits gran<span class=\"_ _2\"></span>ted are linked to Elia\u2019s operating result. There is no external pension fund or group insurance for these liabil<span class=\"_ _e\"></span><span class=\"ff3f\">ities, which </span>means that n<span class=\"_ _2\"></span>o reserves are constituted with third parties. <span class=\"_ _e\"></span>The obligations are classified as a defined-benefit. The co<span class=\"_ _2\"></span>llective agreement determines that active staff hired between 1 Ja<span class=\"_ _e\"></span>nuary 1993 and 31 December 2001 and all managerial/e<span class=\"_ _2\"></span>xecutive staff hired prior to 1 May 1999 wil<span class=\"_ _e\"></span>l be granted the same guarantees via a defined-benefit pension scheme (Elgabel and Pensiobel <span class=\"ff42\">\u2013</span> closed plan<span class=\"_ _2\"></span>s). Obligations under these d<span class=\"_ _e\"></span>efined-benefit pension plans are funded by a number of pension funds for the electricity and ga<span class=\"_ _2\"></span>s industries and by insurance companies.<span class=\"_ _e\"></span> As mentioned abo<span class=\"_ _2\"></span>ve, Elia Transmission Belgium has transferred certain acquired reserves guaranteed by the insurers to 'Cash balance \u2013<span class=\"ff3f\"> best o<span class=\"_ _2\"></span>f' plans since 2016. As this guarantee is an empl<span class=\"_ _e\"></span>oyer obligation, these plans represent defined-benefit plans. </span>Both emplo<span class=\"_ _2\"></span>yees' and employers' contributions are paid o<span class=\"_ _e\"></span>n a monthly basis for the base plans. The emp<span class=\"_ _2\"></span>loyee's contribution is deducted from the salary and<span class=\"_ _2\"></span> paid to the insurer by the employer.<span class=\"_ _e\"></span> OTHER PERSONNEL OBLIGATIONS <span class=\"_ _250\"> </span> Elia Transm<span class=\"_ _2\"></span>ission (Belgium) has also granted staff certain early<span class=\"_ _e\"></span>-retirement schemes and other post-employment benefits such as reimbursement of med<span class=\"_ _2\"></span>ical expenses and a contribution to <span class=\"_ _e\"></span>their energy bills, as well as other long-term benefits (seniority payments). Not all of the<span class=\"_ _2\"></span>se benefits are funded and, in accordance with I<span class=\"_ _e\"></span>AS<span class=\"_ _e\"></span> 19, these<span class=\"_ _2\"></span> post-employment benefits are classified as defined-benefit plans.<span class=\"_ _e\"></span> GERMANY<span class=\"ff3f fs8\"> </span>DEFINED CONTRIBUTION PLANS In <span class=\"_ _2\"></span>the case <span class=\"_ _2\"></span>of externally fin<span class=\"_ _2\"></span>anced defined contribution <span class=\"_ _2\"></span>plans, 5<span class=\"_ _2\"></span>0Hertz Tr<span class=\"_ _e\"></span><span class=\"ff42\">ansmission <span class=\"_ _2\"></span>(Germany)\u2019s obligation <span class=\"_ _2\"></span>is limited to <span class=\"_ _2\"></span>paying <span class=\"_ _2\"></span>the agreed<span class=\"_ _e\"></span> </span>contribu<span class=\"_ _2\"></span>tions. <span class=\"_ _e\"></span>For <span class=\"_ _e\"></span>those <span class=\"_ _e\"></span>defined <span class=\"_ _e\"></span>contribution <span class=\"_ _e\"></span>plans<span class=\"_ _e\"></span> recog<span class=\"_ _e\"></span>nised in<span class=\"_ _e\"></span> the<span class=\"_ _e\"></span> fo<span class=\"_ _e\"></span>rm <span class=\"_ _e\"></span>of <span class=\"_ _e\"></span>direct <span class=\"_ _e\"></span>guarantees, <span class=\"_ _e\"></span>there a<span class=\"_ _e\"></span>re <span class=\"_ _e\"></span>pledged <span class=\"_ _e\"></span>congruent <span class=\"_ _20\"></span><span class=\"ff42\">employer\u2019s </span>liability insuran<span class=\"_ _2\"></span>ce policies in place.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Pension o<span class=\"_ _2\"></span>bligations for executives (agreement with staff representatives from 2003 onwards): individual contractual pension </span></span>obligation<span class=\"_ _2\"></span>s based on an agreement with representatives;<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Pension o<span class=\"_ _2\"></span>bligations for executives (agreement with staff representatives from 19 August 200<span class=\"_ _e\"></span>8 onwards): individual contra<span class=\"_ _2\"></span>ctual </span></span>pension obligatio<span class=\"_ _2\"></span>ns relating to a company pension plan with the Vattenfall Europe Group;<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Collective b<span class=\"_ _2\"></span>argaining agreement on the company pension scheme: obligations based on the collective bargaining agreement </span></span>made in<span class=\"_ _2\"></span> relation to <span class=\"ff42\">50Hertz Transmission\u2019s company pension scheme, concluded on 28</span> N<span class=\"_ _e\"></span>ovember 2007; \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Direct insu<span class=\"_ _2\"></span>rance: direct insurance policies for all former employees who worked at Vereinigte Energ<span class=\"_ _2\"></span>iewerke<span class=\"_ _e\"></span> AG (V<span class=\"_ _e\"></span>EAG) from </span></span>1993 to 31 December 2004, with the e<span class=\"_ _2\"></span>xception of ma<span class=\"_ _e\"></span>nagers; \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Individu<span class=\"_ _2\"></span>al commitments: individual commitments which are financed exclusively by external pension funds (welfare fund and </span></span>pension fund). DEFINED-BENEFIT PLANS Defined-benefit<span class=\"_ _2\"></span> plans entitle employees to su<span class=\"_ _e\"></span>bmit direct pension claims <span class=\"ls1d\">to</span> 50Hertz Transmission. Provisions for these are recognised in the statemen<span class=\"_ _2\"></span>t of financial position. If plan assets are creat<span class=\"_ _e\"></span>ed for the so<span class=\"_ _2\"></span>le purpose of fulfilling pension obligations, the a<span class=\"_ _e\"></span>mount is offset against the present <span class=\"_ _2\"></span>value of the obligation. The following <span class=\"_ _e\"></span>defined-benefit plans exist in Germany:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Grou<span class=\"_ _2\"></span>p works agreement regarding the company pension <span class=\"_ _e\"></span>scheme </span></span>In accordance<span class=\"_ _2\"></span> with the group works agreement regarding <span class=\"_ _e\"></span>the company pension scheme, employees are granted a company pension plan on the basis of a<span class=\"_ _2\"></span> defined-contribution plan (effective <span class=\"_ _e\"></span>1 January 2007). This a<span class=\"_ _2\"></span>greement applies to all employees within the meaning of Sec. 5 (1) o<span class=\"_ _2\"></span>f the German Work Constitution Act (BetrVG) and came into effect at the Company on 1 January 2007. Participati<span class=\"_ _e\"></span>on in the scheme is vo<span class=\"_ _2\"></span>luntary. The scheme grants pension benefits<span class=\"_ _e\"></span> to employees once they reach the statutory retirement age, once they take early re<span class=\"_ _2\"></span>tirement from statutory pension insurance, and in the event of occupational disability f<span class=\"_ _e\"></span>or death. Current pens<span class=\"_ _e\"></span>ion benefits are increased by 1% p.a., so the sch<span class=\"_ _2\"></span>eme is classified as a define<span class=\"_ _e\"></span>d-benefit plan. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">TVV Energie </span></span>This pen<span class=\"_ _2\"></span>sion plan relates to direct guarantees resulting from a collective bargaining agreement concl<span class=\"_ _e\"></span>uded on 16 October 1992. It was closed to new hire<span class=\"_ _2\"></span>s on 1 January 1993. This contribution <span class=\"_ _e\"></span>plan app<span class=\"_ _2\"></span>lies to employees who worked at Vereinigte Energiewerke AG until 30 November 2001 an<span class=\"_ _2\"></span>d whose vested benefits were allocated to Vattenfall Europe Transmission GmbH (now <span class=\"_ _e\"></span>50Hertz Transmission GmbH). The scheme covers pension<span class=\"_ _2\"></span> obligations, based on years of service and remuneration level and grants retirement and disability pensions, but no pen<span class=\"_ _2\"></span>sion for surviving dependants. It is n<span class=\"_ _e\"></span>ot possible to inde<span class=\"_ _2\"></span>x current post<span class=\"_ _e\"></span>-employment benefits falling due for the first time after 1 Januar<span class=\"_ _2\"></span>y 1993.<span class=\"_ _e\"></span> OTHER PERSONNEL OBLIGATIONS 50Hertz Tran<span class=\"_ _2\"></span>smission <span class=\"ff42\">also has following obligations, which are listed under \u2018Other personnel obligations\u2019:<span class=\"_ _e\"></span></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Obligatio<span class=\"_ _2\"></span>ns for long-service benefits;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Obligatio<span class=\"_ _2\"></span>ns from German phased retirement schemes;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Obligatio<span class=\"_ _2\"></span>ns for working lifetime accounts. </span></span>Not all of these b<span class=\"_ _2\"></span>enefits are funded and, in accordance with IAS 19, these post-employment benefits are classified as defined-benefit plans.  EMPLOYEE BEN<span class=\"_ _e\"></span>EFIT OBLIGA<span class=\"_ _2\"></span>TIONS AT GROUP LEVEL  The Group\u2019s <span class=\"_ _2\"></span>net liability for employee benefit obligations is as follows:<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>(in \u20ac million)<span class=\"ff40\"> </span>Pensions Other 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Present value of <span class=\"_ _2\"></span>funded defined benefit obligation<span class=\"_ _e\"></span> (249.6) (298.9) (93.3) (100.1) Fair va<span class=\"_ _2\"></span>lue of plan assets<span class=\"_ _e\"></span> 224.5 236.3 41.3 56.1 Net employee benefit<span class=\"_ _2\"></span> liability (25.1) (62.6) (51.9) (44.0) The net employee<span class=\"_ _2\"></span> benefit liability decreased in total by \u20ac29.5 million, of which \u20ac12.9 million on<span class=\"_ _2\"></span> Belgian level and<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>\u20ac<span class=\"_ _e\"></span>16.6 million on German level. The impact is mainly explained by the increase<span class=\"_ _2\"></span> in discoun<span class=\"_ _e\"></span>t rate compared with 2021 and the lower (negative) return on pla<span class=\"_ _2\"></span>n assets.<span class=\"_ _e\"></span> Movement in the p<span class=\"_ _2\"></span>resent value of the defined benefit obligation<span class=\"_ _e\"></span> Pensions Other (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>At the<span class=\"_ _2\"></span> beginning of the period<span class=\"_ _e\"></span> (298.9) (292.3) (100.1) (110.8) Curren<span class=\"_ _2\"></span>t service cost<span class=\"_ _e\"></span> (15.9) (15.2) (3.1) (10.4) Intere<span class=\"_ _2\"></span>st cost/income<span class=\"_ _e\"></span> (2.9) (1.7) (1.3) (0.6) Contributions fr<span class=\"_ _2\"></span>om plan participants<span class=\"_ _e\"></span> (1.0) (0.9) 0.0 0.0 Including remeasu<span class=\"_ _2\"></span>rement gains/(losses) in OCI and in Statement<span class=\"_ _2\"></span> of profit or loss, arising from<span class=\"_ _e\"></span> 1) Changes in demo<span class=\"_ _2\"></span>graphic assumptions<span class=\"_ _e\"></span> 0.0 0.0 0.0 0.0 2) Changes in f<span class=\"_ _2\"></span>inancial assumptions<span class=\"_ _e\"></span> 57.3 17.7 19.9 3.7 3) Changes from e<span class=\"_ _2\"></span>xperience adjustments (15.5) (5.3) (0.6) (0.3) Past service co<span class=\"_ _2\"></span>st 0.0 0.1 0.0 0.0 Payments from t<span class=\"_ _2\"></span>he plan 16.2 16.8 3.1 2.8 Transfers 11.1 (18.2) (11.1) 15.5 At the<span class=\"_ _2\"></span> end of the period<span class=\"_ _e\"></span> (249.6) (298.9) (93.3) (100.1) Movement in the fa<span class=\"_ _2\"></span>ir value of the plan assets<span class=\"_ _e\"></span> Pensions Other (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>At the<span class=\"_ _2\"></span> beginning of the period<span class=\"_ _e\"></span> 236.3 241.4 56.1 29.6 Intere<span class=\"_ _2\"></span>st income 2.4 1.0 0.0 0.1 Remeasurement ga<span class=\"_ _2\"></span>ins/losses in OCI arising from:<span class=\"_ _e\"></span> Return of plan<span class=\"_ _2\"></span> assets <span class=\"_ _e\"></span> (excluding<span class=\"_ _2\"></span> interest income on plan assets)<span class=\"_ _e\"></span> (35.7) 12.0 (0.3) 3.7 Contributions fr<span class=\"_ _2\"></span>om employer 14.4 10.2 5.9 9.7 Contributions fr<span class=\"_ _2\"></span>om plan participants<span class=\"_ _e\"></span> 1.0 0.9 0.0 0.0 Transfers 19.4 (13.1) (19.4) 15.8 Benefit payments (13.3) (16.2) (0.9) (2.7) At the<span class=\"_ _2\"></span> end of the period<span class=\"_ _e\"></span> 224.5 236.3 41.3 56.1 Amounts<span class=\"_ _2\"></span> recognised in comprehensive income<span class=\"_ _e\"></span> Pensions Other (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Service cost Curren<span class=\"_ _2\"></span>t service cost<span class=\"_ _e\"></span> (15.9) (15.2) 1.8 (4.1) Past service co<span class=\"_ _2\"></span>st 0.0 0.1 0.0 0.0 Settlements 0.6 0.6 0.1 0.1 Net interest on the<span class=\"_ _2\"></span> net defined-benefit liability/(asset)<span class=\"_ _e\"></span> (0.6) (0.7) (1.2) (0.5) Intere<span class=\"_ _2\"></span>st cost on defined-benefit obligation<span class=\"_ _e\"></span> (2.9) (1.7) (1.3) (0.6) Intere<span class=\"_ _2\"></span>st income on plan assets<span class=\"_ _e\"></span> 2.4 1.0 0.0 0.1 Other (0.0) (0.0) 0.0 0.3 Defined-benefit cos<span class=\"_ _2\"></span>ts recognised in profit or loss (15.9) (15.1) 0.6 (4.2) Actuarial gains(/loss<span class=\"_ _2\"></span>es) on defined obligations arising from:<span class=\"_ _e\"></span> 1) Changes in demo<span class=\"_ _2\"></span>graphic assumptions<span class=\"_ _e\"></span> 0.0 0.0 0.0 0.0 2) Changes in f<span class=\"_ _2\"></span>inancial assumptions<span class=\"_ _e\"></span> 57.3 17.7 19.9 3.1 3) Changes from e<span class=\"_ _2\"></span>xperience adjustments (15.5) (5.3) (0.6) (0.1) Return on plan assets (exclud<span class=\"_ _2\"></span>ing interest income on plan assets)<span class=\"_ _e\"></span> (35.7) 12.0 (0.3) 3.7 Remeasurement<span class=\"_ _2\"></span>s of net defined benefit (liability)/asset recogn<span class=\"_ _2\"></span>ised in other comprehensive income (OCI)<span class=\"_ _e\"></span> 6.1 24.5 19.0 6.6 Total (9.8) 9.4 19.6 2.4 Considerin<span class=\"_ _2\"></span>g the actuarial gains or losses recognised in other comprehensive income for the reimbursement right<span class=\"_ _e\"></span>s (-<span class=\"ff42\">\u20ac</span>8.9 million for 2022 - see herea<span class=\"_ _2\"></span>fter), the net impact of the remeasurement of <span class=\"_ _e\"></span>post-employments benefit obligations amounts to +<span class=\"ff42\">\u20ac</span><span class=\"ls78\">16</span>.<span class=\"_ _2\"></span>2 million. (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Breakdown o<span class=\"_ _2\"></span>f defined-<span class=\"_ _e\"></span>benefit obligation by<span class=\"_ _2\"></span> type of plan participants<span class=\"_ _e\"></span> (342.9) (399.0) Active plan participan<span class=\"_ _2\"></span>ts (272.7) (314.9) Term<span class=\"_ _2\"></span>inated plan participants with def.-b<span class=\"_ _e\"></span>enefit entitlements (21.5) (24.8) Retired p<span class=\"_ _2\"></span>lan participants and beneficiaries<span class=\"_ _e\"></span> (48.7) (59.3) Breakdown o<span class=\"_ _2\"></span>f defined-<span class=\"_ _e\"></span>benefit obligation by<span class=\"_ _2\"></span> type of benefits<span class=\"_ _e\"></span> (342.9) (399.0) Retirement an<span class=\"_ _2\"></span>d death benefits<span class=\"_ _e\"></span> (248.4) (288.2) Other post-employment benefit<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> (82.4) (57.3) Seniority pa<span class=\"_ _2\"></span>yments<span class=\"_ _e\"></span> (12.1) (53.6) When determin<span class=\"_ _2\"></span>ing the app<span class=\"_ _e\"></span>ropriate discount rate, the group considers the interest rates of corporate bonds in currencies consistent with the currencie<span class=\"_ _2\"></span>s of the post-employment benefit obligation w<span class=\"_ _e\"></span>ith at least an 'AA' rating or above, as set by an internationally acknowledged rating agency,<span class=\"_ _2\"></span> and extrapolated as needed along the yield curve to correspond with t<span class=\"_ _e\"></span>he expected term of the defined benefit obligation. A stress test is performe<span class=\"_ _2\"></span>d annually. This test verifies that the minimum funding requirements are covered to deal with 'shock<span class=\"_ _e\"></span>s' with probabilities of occurrence of 0.5%.<span class=\"fc1d\"> </span>The members (mostly) c<span class=\"_ _2\"></span>ontribute to the financing of the retirement benefits by paying a personal contribution.<span class=\"_ _e\"></span> Th<span class=\"ls0\">e annual balance of the defined benefit lump sum is financed by the employer through a recurrent allowance, wh<span class=\"_ _e\"></span>ich is expressed as a </span>percen<span class=\"_ _2\"></span>tage of the total payroll of the participants. This percentage is defined by the aggregate cost method and is reviewed <span class=\"_ _e\"></span>annually. This me<span class=\"_ _2\"></span>thod of financing involves smoothing future costs over the remaining period of the plan. The costs are estimat<span class=\"_ _e\"></span>ed on a projected basis (taking into accoun<span class=\"_ _2\"></span>t salary growth and inflation). The assumptions related to salary increase, inflation, employee turnover and age term are defined<span class=\"_ _2\"></span> on the basis of historical data from the Company. The mortality tables used are those corr<span class=\"_ _e\"></span>esponding to t<span class=\"_ _2\"></span>he observed experien<span class=\"_ _2\"></span>ce within the financing vehicle and take into consideration expected changes in mortality. The g<span class=\"_ _e\"></span>roup calculates the net interest on the net defined<span class=\"_ _2\"></span> benefit liability (asset) using the same high-quality bond discount rate (see above) <span class=\"_ _e\"></span>used to measure the de<span class=\"_ _2\"></span>fined benefit obligatio<span class=\"_ _2\"></span>n (net interest approach). These assumpti<span class=\"_ _e\"></span>ons are challenged on a regular basis. Exceptional events (<span class=\"_ _2\"></span>such as modifications ma<span class=\"_ _e\"></span>de to the plan, changes in assumptions and overly short coverage terms) can lead to outstand<span class=\"_ _2\"></span>ing payments from the sponsor.<span class=\"_ _e\"></span> The defined<span class=\"_ _2\"></span> benefit plans expose the Company to actuarial risks such as investment risk, interest<span class=\"_ _e\"></span>-rate risk, longevity risk and salary r<span class=\"_ _2\"></span>isk.<span class=\"_ _e\"></span><span class=\"ff40 fs11\"> </span>Investmen<span class=\"_ _e\"></span>t risk<span class=\"_ _2\"></span> The presen<span class=\"_ _2\"></span>t value of the defined benefit plan liability is calculated using a discount rate which is dete<span class=\"_ _e\"></span>rmined based on high-quality corporate bonds. The<span class=\"_ _2\"></span> difference between the actual return on assets and the interest income on plan assets is included in t<span class=\"_ _e\"></span><span class=\"ls5b\">he </span>remea<span class=\"_ _2\"></span>surements component (OCI). Currently the plan ha<span class=\"_ _e\"></span>s a relative<span class=\"_ _2\"></span>ly balanced range of investments, as shown b<span class=\"_ _e\"></span>elow<span class=\"_ _e\"></span>: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Investments quot<span class=\"_ _2\"></span>ed in an active market<span class=\"_ _e\"></span> 72.44% 71.02% Shares - <span class=\"_ _2\"></span>Eurozone<span class=\"_ _e\"></span> 13.24% 13.99% Shares - outside<span class=\"_ _2\"></span> Eurozone<span class=\"_ _e\"></span> 17.34% 17.98% Government bonds - Eurozone 0.94% 1.31% Other bonds - Eurozone 24.75% 24.85% Other bonds - outside Eurozone 16.18% 12.89% Unquoted invest<span class=\"_ _2\"></span>ments<span class=\"_ _e\"></span> 27.56% 28.98% Qualifying insuran<span class=\"_ _2\"></span>ce contracts<span class=\"_ _e\"></span> 12.23% 10.91% Property 2.21% 2.50% Cash and cash equivalen<span class=\"_ _2\"></span>ts 2.81% 2.82% Other 10.31% 12.76% Total (in %) 100.00% 100.00% Due to the long-term nature of the<span class=\"_ _2\"></span> plan liabilities, it is considered appropriate that a reasonable portion of the plan assets be in<span class=\"_ _2\"></span>vested in<span class=\"_ _20\"></span> equity securities to<span class=\"_ _2\"></span> leverage the return generated by the f<span class=\"_ _e\"></span>und. In<span class=\"_ _2\"></span> Germany, all plan assets are invested in insurance agreements.<span class=\"_ _20\"></span> Inter<span class=\"_ _e\"></span>est risk<span class=\"_ _2\"></span> A decrease<span class=\"_ _2\"></span> in the bond interest rate will increase the plan liability. However, this will be partially offset by an incr<span class=\"_ _e\"></span>ease in the return on the plan<span class=\"_ _2\"></span>\u2019s assets, of which approximately 95% is now invested in pension funds with an expected return of 3<span class=\"ff3f\">.1<span class=\"_ _e\"></span>2<span class=\"ls24\">%.</span> </span>Longev<span class=\"_ _2\"></span>ity risk <span class=\"ff3f\"> </span>The presen<span class=\"_ _2\"></span>t value of the defined benefit plan liability is calculated based on the best estimate of the<span class=\"_ _e\"></span> life expectancy of plan participants both during and a<span class=\"_ _2\"></span>fter their employment. An increase in the life expectancy of the plan participants will increase the plan's l<span class=\"_ _e\"></span>iability. The prospe<span class=\"_ _2\"></span>ctive mortality tables from the IA/BE <span class=\"_ _e\"></span>are used in Belgium and the 2018 Heubeck tables are uesed in Germany. Salary risk  The presen<span class=\"_ _2\"></span>t value of the defined benefit plan liability is calculated based on the future salaries of plan participants. As such, an increase in the salary of <span class=\"_ _2\"></span>the plan participants will increase the plan\u2019<span class=\"_ _e\"></span>s<span class=\"ff3f\"> liability. </span>ACTUARIAL ASSUMPTIONS (in % and years) Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Discount ra<span class=\"_ _2\"></span>te<span class=\"_ _e\"></span> - Pensions - defined benefit p<span class=\"_ _2\"></span>lans and cash balance - best off plans 3.75% 0.83% 3.59% 1.26% - Pensions - defined con<span class=\"_ _2\"></span>tribution plans<span class=\"_ _e\"></span> 3.77% 1.12% - - - Other 3.75% 1.14% 3.59% 1.26% Expected average salar<span class=\"_ _2\"></span>y increase (excluding inflation)<span class=\"_ _e\"></span> 1.00% 1.00% 2.75% 2.15% Expected infla<span class=\"_ _2\"></span>tion<span class=\"_ _e\"></span> 2.10% 1.75% 2.50% 2.00% Expected increase in<span class=\"_ _2\"></span> health benefits (including inflation)<span class=\"_ _e\"></span> 3.10% 2.75% 2.25% 2.25% Expected increase in<span class=\"_ _2\"></span> tariff advantages<span class=\"_ _e\"></span> 2.10% 1.75% - - Average a<span class=\"_ _2\"></span>ssumed retirement age - Employee 63<span class=\"ls0\"> </span>63<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>- Manager 65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>Life expectancy in y<span class=\"_ _2\"></span>ears of a pensioner retiring at age 65 at clos<span class=\"_ _2\"></span>ing date:*<span class=\"_ _e\"></span> Life expe<span class=\"_ _2\"></span>ctancy for a 65 year old male<span class=\"_ _e\"></span> 19.9 19.9 20.7 20.5 Life expe<span class=\"_ _2\"></span>ctancy for a 65 year old female<span class=\"_ _e\"></span> 23.6 23.6 24.1 24<span class=\"ls0\"> </span>*Mortality tables used: IABE in Belgium, 2018 Heubeck in Germany (in years ) Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Weighted a<span class=\"_ _2\"></span>verage duration of the defined benefit obligati<span class=\"_ _e\"></span>on 8.0                       <span class=\"_ _e\"></span>   <span class=\"ls0\">8.5 <span class=\"_ _e\"></span> </span>23.4 28.7 Weighted a<span class=\"_ _2\"></span>verage duration of the defined contribution plans<span class=\"_ _e\"></span> 9.7                       <span class=\"_ _e\"></span>   <span class=\"ls0\">9.7 <span class=\"_ _e\"></span> </span>n.r. n.r. Weighted a<span class=\"_ _2\"></span>verage duration of the post<span class=\"_ _e\"></span>-employment benefits other than pensions 13.2                       <span class=\"_ _e\"></span> <span class=\"ls0\">13.2 <span class=\"_ _e\"></span> </span>12.7 14.0 In Germany, the liability o<span class=\"_ _2\"></span>f the defined cont<span class=\"_ _e\"></span>ribution plans is complete<span class=\"_ _2\"></span>ly covered by the plan assets. Therefore, no w<span class=\"_ _e\"></span>eighted average duration is necessary and thus not <span class=\"_ _2\"></span>calculated.<span class=\"_ _e\"></span> The a<span class=\"_ _2\"></span>ctual return on plan assets in percentage terms f<span class=\"_ _e\"></span>or 20<span class=\"ls5b\">22</span> was negative, ranged between -2.6% and -18.0% (compared with a range<span class=\"_ _2\"></span> of 2.7% to 12.0%<span class=\"_ _e\"></span> in 2021<span class=\"ls8f\">).</span> Below is an over<span class=\"_ _2\"></span>view of the expected cash outflows for the DB plans:<span class=\"_ _e\"></span> Future expected cash<span class=\"_ _2\"></span> outflows<span class=\"_ _e\"></span> &lt; 12 months 1-5 years 6 <span class=\"ls0\">- 10 years </span>Pensions (4.6) (20.4) (25.3) Other (0.1) (0.3) (0.4) Total (in \u20ac million)<span class=\"ff40\"> </span>(4.7) (20.7) (25.7) There is some degree of uncertainty<span class=\"_ _2\"></span> linked to the above e<span class=\"_ _e\"></span>xpected cash outflows which can be explained by the following factors:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">differ<span class=\"_ _2\"></span>ences between assumptions and actual data can occur, e.g. retirement age and future salary increase;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the e<span class=\"_ _2\"></span>xpected cash outflows shown above are based on a closed population and therefore do not incorporate future new hir<span class=\"_ _2\"></span>es;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">futur<span class=\"_ _2\"></span>e premiums are calculated based on the last known aggregate cost rate, which is reviewed on an annual basis and varies </span></span>depend<span class=\"_ _2\"></span>ing on the return on plan assets, the actu<span class=\"_ _e\"></span>al salary increase<span class=\"_ _2\"></span> as opposed to the assumptions, and unexpected changes in<span class=\"_ _e\"></span> the population<span class=\"_ _2\"></span>. SENSITIVITY ANALYSIS Effect on def<span class=\"_ _2\"></span>ined benefit obligation<span class=\"_ _e\"></span> Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany Increase<span class=\"_ _2\"></span> (+) /<span class=\"_ _e\"></span> Increase<span class=\"_ _2\"></span> (+) / <span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span> Decrease (-) Decrease (-) Impact on the net<span class=\"_ _2\"></span> defined-benefit obligation of an increase in:<span class=\"_ _e\"></span> Discount ra<span class=\"_ _2\"></span>te (0.5% movement) 14.4 4.6 Average sa<span class=\"_ _2\"></span>lary increase <span class=\"_ _e\"></span>- excl. inflation (0.5% movement) (9.2) (2.6) Inflation (0.25<span class=\"_ _2\"></span>% movement)<span class=\"_ _e\"></span> (5.5) (0.2) Increase of h<span class=\"_ _2\"></span>ealthcare care benefits (1.0% movement)<span class=\"_ _e\"></span> (0.1) n.r. Life expe<span class=\"_ _2\"></span>ctancy of pensions (1 year)<span class=\"_ _e\"></span> (3.3) (0.8) REIMBURSEMENT RIGHTS (BELGIUM) As described<span class=\"_ _2\"></span> in Note 6.6, a non-current asset (within other financial assets) is recognised as reimbursement <span class=\"_ _e\"></span>rights linked to the defined benefit obligatio<span class=\"_ _2\"></span>n for the population benefitting from the interest scheme and medical plan liabilities and tariff benefits f<span class=\"_ _e\"></span>or retired Elia employee<span class=\"_ _2\"></span>s. Each change in these liabilities equally affects the corresponding reimburse<span class=\"_ _e\"></span>ment rights under non-current other financial assets. The change<span class=\"_ _2\"></span> in reimbursement rights is presented below:<span class=\"_ _e\"></span> Movement in the p<span class=\"_ _2\"></span>resent value of the reimbursement r<span class=\"_ _e\"></span>ight<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> Pensions Other (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>At the<span class=\"_ _2\"></span> beginning of the period<span class=\"_ _e\"></span> (19.0) (22.6) (27.2) (31.2) Curren<span class=\"_ _2\"></span>t service costs<span class=\"_ _e\"></span> Intere<span class=\"_ _2\"></span>st cost/income<span class=\"_ _e\"></span> (0.1) (0.1) (0.3) (0.2) Actuarial gains(/loss<span class=\"_ _2\"></span>es) on defined obligations arising from:<span class=\"_ _e\"></span> 1) Changes in demo<span class=\"_ _2\"></span>graphic assumptions<span class=\"_ _e\"></span> 0.0 0.0 0.0 0.0 2) Changes in financial assumptions 3.0 0.7 8.4 2.2 3) Changes from e<span class=\"_ _2\"></span>xperience adjustments 0.0 0.4 (2.4) 0.5 Payments from t<span class=\"_ _2\"></span>he plan 2.2 2.5 1.8 1.6 At the<span class=\"_ _2\"></span> end of the period<span class=\"_ _e\"></span> (14.0) (19.0) (19.7) (27.2) The sum of \u2018Pen<span class=\"_ _2\"></span>sions\u2019 (\u20ac14.0 million) and \u2018Other\u2019 (\u20ac19.7 <span class=\"_ _e\"></span>million) re<span class=\"_ _2\"></span>imbursement rights amounted to \u20ac33.7 million i<span class=\"_ _e\"></span>n 2021<span class=\"_ _2\"></span> (2020: \u20ac 46.2 million), which<span class=\"_ _2\"></span> reconciles with the reimbursement rights listed in Note 6.6.<span class=\"_ _e\"></span> Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.15. <span class=\"_ _92\"> </span>Provision<span class=\"_ _e\"></span>s (in \u20ac million)<span class=\"ff40\"> </span>Dismantling Employee Environmen<span class=\"_ _2\"></span>t Elia Re Other Total Obligations benefits Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 11.5 5.4 116.3 1.9 5.6 140.7 Increase 0.3 1.0 2.1 (0.1) 1.9 5.2 Reversals (0.4) (2.0) (9.6) 0.0 (0.8) (12.9) Utilisation (0.1) (0.4) 0.0 (0.1) (0.7) (1.2) Discounting o<span class=\"_ _2\"></span>f provisions<span class=\"_ _e\"></span> (0.0) 0.0 1.4 0.0 0.0 1.4 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 11.2 4.1 110.1 1.7 6.1 133.2 Long<span class=\"ls0\">-term portion<span class=\"_ _e\"></span> </span>9.1 4.1 110.1 0.0 2.2 125.6 Short-term portion 2.1 0.0 0.0 1.7 3.9 7.7 Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 11.2 4.1 110.1 1.7 6.1 133.2 Increase 1.4 2.0 57.9 1.5 1.3 64.2 Reversals (1.0) (2.9) (37.1) 0.0 (1.3) (42.4) Utilisation (0.3) (0.4) 0.0 (0.1) (0.5) (1.2) Discounting o<span class=\"_ _2\"></span>f provisions<span class=\"_ _e\"></span> (0.2) 0.0 1.1 0.0 0.0 0.9 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 11.1 2.9 132.0 3.2 5.7 154.8 Long<span class=\"ls0\">-term portion<span class=\"_ _e\"></span> </span>9.2 2.9 132.0 0.0 2.1 146.2 Short-term portion 2.0 0.0 0.0 3.2 3.4 8.6 The group<span class=\"_ _2\"></span> has recognised provisions for the following:<span class=\"_ _e\"></span> Environmen<span class=\"_ _2\"></span>t:<span class=\"ff3f\"> The environmental provision provides for <span class=\"_ _e\"></span>existing expo<span class=\"_ _2\"></span>sure with respect to <span class=\"ff42\">l<span class=\"_ _e\"></span>and decontamination. The \u20ac11.1</span> million </span>provision mainly r<span class=\"_ _2\"></span>elates to the B<span class=\"ff42\">elgian segment, with only a \u20ac1.9</span> <span class=\"_ _e\"></span>million provision relating to the German segment. There were no significant movements in t<span class=\"_ _2\"></span>he environmental provisions in <span class=\"_ _e\"></span>2022.  More specifically for the<span class=\"_ _2\"></span> Belgian segment, Elia has conducted soil surveys on over 200 sites in Flanders in accordance with c<span class=\"_ _e\"></span><span class=\"ls5b\">on</span>tractual agreements and Flemish<span class=\"_ _2\"></span> legislation. Significant soil contamination was found on a number of sites, with this being mainly attri<span class=\"_ _e\"></span>butable to historical p<span class=\"_ _2\"></span>ollution arising from earlier or nearby industrial activities (gas plants, incinerators, chemicals, <span class=\"_ _e\"></span>etc.). In the <span class=\"_ _e\"></span>Brussels-Capital and Walloon<span class=\"_ _2\"></span> Regions, Elia also carried out analyses and <span class=\"_ _e\"></span>studies to detect contamination at a<span class=\"_ _2\"></span> number of substations and a number of plots occup<span class=\"_ _2\"></span>ied by pylons for overhead power lines. Based<span class=\"_ _e\"></span> on the analyse<span class=\"_ _2\"></span>s and studies it con<span class=\"_ _e\"></span>ducted, Elia has made <span class=\"_ _e\"></span>provisions for possible fu<span class=\"_ _2\"></span>ture soil remediation costs in line with the relevant legislation.<span class=\"_ _e\"></span> Environmental provisions are r<span class=\"_ _2\"></span>ecognised and measured based on an expert appraisal bearing in mind BATNEEC (Best Available Techniques Not <span class=\"_ _2\"></span>Entailing Excessive Costs) as well as on the circumstances known at the end of the reporting period. The timing <span class=\"_ _e\"></span>of the settlement is unclear b<span class=\"_ _2\"></span>ut for the premises where utilisations occur, the underlying provision is classified as a short<span class=\"_ _e\"></span>-term provision. Elia Re: <span class=\"ff3f\">An amount<span class=\"fc1d\"> </span><span class=\"ff42\">of \u20ac2.9</span> million is in<span class=\"_ _2\"></span>cluded at year-<span class=\"ff42\">e<span class=\"_ _e\"></span>nd for Elia Re, a captive reinsurance company. \u20ac0.</span>1 million of this is linked to </span>claims for o<span class=\"_ _2\"></span>verhead lines, whilst <span class=\"ff42\">\u20ac</span>2.8 million is linked to <span class=\"_ _e\"></span>electrical insta<span class=\"_ _2\"></span>llations. The expected<span class=\"_ _e\"></span> timing of the related cash outflow depends on the progress and duratio<span class=\"_ _2\"></span>n of the respective procedures.<span class=\"_ _e\"></span> Dismantling p<span class=\"_ _2\"></span>rovisions: <span class=\"ff42\">As part of the Group\u2019s CAPEX <span class=\"_ _e\"></span>program<span class=\"ff3f ls57\">me<span class=\"ls0\">, <span class=\"_ _2\"></span>the Group is exposed to decommissioning obligations; most of </span></span></span>which are related to offsho<span class=\"_ _2\"></span>re projects. <span class=\"_ _e\"></span>These provision<span class=\"_ _2\"></span>s t<span class=\"_ _e\"></span>ake into account the effect of discounting and the expected cost of dismantling and removing<span class=\"_ _2\"></span> the equipment from sites or from the sea. The carrying amount of the <span class=\"ff42\">pr<span class=\"_ _e\"></span>ovision as at 31 December 2022 was \u20ac132.0 </span>million. Despite a higher d<span class=\"_ _2\"></span>iscount rate, the provision incre<span class=\"_ _e\"></span>ased due to the reassessment of the co<span class=\"_ _2\"></span>sts (inflation and <span class=\"_ _e\"></span>additiona<span class=\"_ _2\"></span>l projects), especially in Germa<span class=\"_ _2\"></span>ny where the obligation went from \u20ac89.0 million to \u20ac114.2 million. <span class=\"_ _e\"></span><span class=\"ff3f\">The Group has applied a case-<span class=\"ls5b\">by</span>-case approach </span>to estima<span class=\"_ _2\"></span>te the cash outflow needed to settle the liability.<span class=\"_ _e\"></span> Elia Group u<span class=\"_ _2\"></span>ses corporate bond rates (minimum AA rating) and sets them out to match the lifetime of the provisions in order to discount the dismantling provision<span class=\"_ _2\"></span>s. In case the discount rate is below 0%, the r<span class=\"_ _e\"></span>ate is floored at 0%. The discount rates used in 2022 ranged between 3.<span class=\"ls5b\">79</span>% to 3.<span class=\"ls5b\">83</span>%, depending on the lifetime of the asset to dismantle. Should the discount rate increase by 1%, the dismantling provisions would increase b<span class=\"_ _2\"></span>y \u20ac20.4 million.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Employee ben<span class=\"_ _2\"></span>efits<span class=\"ff3f\">: See Note 6.1<span class=\"ls78\">4 </span>for more deta<span class=\"_ _2\"></span>ils of these short-term employee benefits.<span class=\"_ _e\"></span> </span>\u2018<span class=\"ff40\">Other<span class=\"ff3f\">' consists of <span class=\"_ _2\"></span>various provisions for litigation to cover likely payment where legal proceedings have been instituted against the </span></span>Group by a th<span class=\"_ _2\"></span>ird party or where the Group is involved in l<span class=\"_ _e\"></span>egal proceed<span class=\"_ _2\"></span>ings. These estimates are based on the value of claims file<span class=\"_ _e\"></span>d or on the estimated le<span class=\"_ _2\"></span>vel of risk exposure. The expected timing <span class=\"_ _e\"></span>of the related cash outflow depends on<span class=\"_ _2\"></span> the progress and <span class=\"_ _e\"></span>duration of the associated proceeding<span class=\"_ _2\"></span>s. No<span class=\"ls0\"> assets h<span class=\"_ _2\"></span>ave been recognised in connection with the r<span class=\"_ _e\"></span>ecovery of certain provisions.<span class=\"fs11 fc1e\"> </span></span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.16. <span class=\"_ _92\"> </span>Oth<span class=\"_ _e\"></span>er non-current liabilities (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Investment grants 213.9 147.2 Non-current deferred<span class=\"_ _2\"></span> income 147.2 140.5 Derivatives 24.7 0.0 Other 1.8 1.8 Total 387.6 289.5 Of the total investment gra<span class=\"_ _2\"></span>nts, \u20ac137.8<span class=\"ff3f\"> million relates to 50<span class=\"_ _e\"></span>Hertz Transmission (Germany) </span>and \u20ac76,2 million to Elia Transmission (Belgium).<span class=\"_ _2\"></span> The investment grants are spread over several assets. The most significant projects a<span class=\"_ _e\"></span>re: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In Belgium<span class=\"_ _2\"></span>: the Princess Elisabeth energy island which will serve as an extension of the electricity grid in the North Sea. This </span></span>grant has been signed in <span class=\"ff42\">December 2022 for a total amount of \u20ac99,7 m<span class=\"_ _2\"></span>illion (pre<span class=\"_ _e\"></span><span class=\"ff3f\">-</span>taxes), out of which \u20ac73,1 million are reported in </span>the Other non-current liability (post taxe<span class=\"_ _2\"></span>s);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In Ge<span class=\"_ _2\"></span>rmany: SuedOstLink and Kriegers Flak Combined Grid Solution<span class=\"_ _2\"></span>.<span class=\"_ _e\"></span> </span></span>All are were<span class=\"_ _2\"></span> subsidized by the European Unio<span class=\"_ _e\"></span>n. The grants are released in profit and loss based on the usefu<span class=\"_ _2\"></span>l lives of the assets to which they relate<span class=\"_ _2\"></span>. The terms and conditions of the grants were monitored and met as per 31 December 2022.<span class=\"_ _e\"></span> Contract liabilities re<span class=\"_ _2\"></span>mained stable<span class=\"fc1d\">.</span> They mainly relate to <span class=\"_ _e\"></span>upfront payment for last mile connection<span class=\"_ _2\"></span>. At the end of 2022, a liability of \u20ac112.7<span class=\"_ _2\"></span> million was recognised within Elia Transmission (Belgium) and a liability of \u20ac34.5 m<span class=\"_ _2\"></span>illion within 50Hertz Transmission<span class=\"_ _e\"></span><span class=\"ff3f\"> (G<span class=\"_ _e\"></span>ermany) </span>with that respect<span class=\"_ _2\"></span>. The income is released over the lifetime of the asset where the last mile connection relates to. As <span class=\"_ _e\"></span>already disclosed in Note 5.1, <span class=\"ff42\">the group has recog<span class=\"_ _2\"></span>nised \u20ac8.3 million of revenue in the reporting period that was included in the contract liability balance <span class=\"_ _e\"></span><span class=\"ff3f\">a<span class=\"ls1d\">t </span></span></span>the beg<span class=\"_ _2\"></span>inning of the period (\u20ac137.3 million), including \u20ac5.1 million from non<span class=\"ff3f\">-cu<span class=\"_ _e\"></span>rrent contract liabilities. </span>The non-curre<span class=\"_ _2\"></span>nt derivatives are related to the long term <span class=\"_ _e\"></span>future contracts entered into by 50Hertz for the purpose of reducing<span class=\"_ _2\"></span> the risk of fluctuation<span class=\"_ _2\"></span>s in the expected amount of grid losses. As p<span class=\"_ _e\"></span>er 31 December 2022, these contracts have a negative fair value du<span class=\"_ _2\"></span>e to the drop in energy pr<span class=\"_ _2\"></span>ices in the last months of the year.<span class=\"_ _e\"></span> Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.17. <span class=\"_ _92\"> </span>Trade<span class=\"_ _e\"></span> and other payables (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Trade deb<span class=\"_ _2\"></span>ts 1,279.0 905.3 VAT and other t<span class=\"_ _2\"></span>axes<span class=\"_ _e\"></span> 29.2 21.1 Remuneration<span class=\"_ _2\"></span> and social security 46.6 40.9 Dividends pa<span class=\"_ _2\"></span>yable<span class=\"_ _e\"></span> 1.2 1.2 Levies 3,125.7 2,177.6 Other 244.7 536.0 Accrued liabilities 77.7 14.2 Total 4,804.2 3,696.4 The trade debts in<span class=\"_ _2\"></span>creased by \u20ac1,107.8 million in a context of increased activity levels and high volatility in energy prices <span class=\"_ _e\"></span><span class=\"ff3f\">in 2022. The </span>significant variation<span class=\"_ _2\"></span> is mostly explained by the levies (+\u20ac948,1 million).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>The <span class=\"ff42\">amoun<span class=\"_ _2\"></span>t for levies can be split into levies related to 50<span class=\"_ _e\"></span>Hertz Transm<span class=\"_ _2\"></span>ission (\u20ac2,<span class=\"_ _e\"></span><span class=\"ff3f ls5b\">959<span class=\"ls0\">.<span class=\"_ _e\"></span>8 million) and levies related to Elia Tran<span class=\"_ _2\"></span>smission </span></span></span>(\u20ac<span class=\"ff3f ls5b\">165<span class=\"ls0\">.9 million). <span class=\"_ _e\"></span> </span></span>The levie<span class=\"_ _2\"></span>s for Elia Transmission <span class=\"ls1c\">in</span>creased compared with<span class=\"_ _e\"></span> the <span class=\"ff42\">previous year (\u20ac</span>+141.3 million). The levies include federal levies, which totalled \u20ac<span class=\"ff3f ls5b\">150<span class=\"ls0\">.0 million on 31 December 2022 </span></span><span class=\"ls57\">(\u20ac</span><span class=\"ff3f\">6.2<span class=\"_ _2\"></span> million<span class=\"_ _e\"></span> in 2021<span class=\"ff42\">). Levies for the Walloon government decrea<span class=\"_ _2\"></span>sed to \u20ac1<span class=\"ff3f\">3.8<span class=\"_ _e\"></span> million, </span></span></span>(\u20ac<span class=\"ff3f ls5b\">17<span class=\"ls0\">.0 million in 2021<span class=\"ff42\">). The remaining balance mainly consists of strategic reserves (\u20ac</span>0<span class=\"_ _e\"></span>.7 million). The significant increase in federal </span></span>leview is explained by a<span class=\"_ _2\"></span> new system implemented in 2022 <span class=\"_ _e\"></span>which allows the group to be pre-funded for its green certificate buybacks in a 2022 context where wind pr<span class=\"_ _2\"></span>oduction has been significantly lower than expected.<span class=\"_ _e\"></span> The levie<span class=\"_ _2\"></span>s for 50Hertz Transmission <span class=\"ls1c\">in</span>creased compared<span class=\"_ _e\"></span> to previous yea<span class=\"ff42\">r (\u20ac2153.0 million) due to the significant in</span>crease of the EEG balance. The<span class=\"_ _2\"></span> 2022 levies mainly include <span class=\"ff42\">EEG (<span class=\"_ _e\"></span>\u20ac2,934.4 million) and \u00a719StromNEV (\u20ac</span>25.3 million). The o<span class=\"_ _2\"></span>ther payables mainly related to margin calls on derivatives hedging grid losses of the German segment (\u20ac235.0 million as<span class=\"_ _e\"></span><span class=\"ff3f\"> of 31 </span>December 2022 compared to \u20ac356<span class=\"_ _2\"></span>.0 million last year) and other regulatory liabilities. <span class=\"_ _e\"></span><span class=\"ff3f\"> </span>6.18. <span class=\"_ _92\"> </span>Fin<span class=\"_ _e\"></span>ancial instruments <span class=\"ff43\">\u2013</span> fair values The fo<span class=\"_ _2\"></span>llowing table shows the carrying amounts and fair values of financial assets and liabilities, including their levels in<span class=\"_ _e\"></span> the fair value hierar<span class=\"_ _2\"></span>chy<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> Carrying amount Fair value (in \u20ac million)<span class=\"ff40\"> </span>Balance at 31 December<span class=\"_ _2\"></span> 2021<span class=\"ls0\"> </span>Other financial assets 7.0  399.4  46.2  452.5  362.6  43.8  406.4  Equity instruments at fair value through other comprehensive income 43.8  43.8  43.8  43.8  Equity instruments at fair value through income 7.0  7.0  7.0  7.0  Derivatives 355.6  355.6  355.6  355.6  Regulatory assets 46.2  46.2  Trade and other receivables  (Current and Non-current) 861.8  861.8  Cash and cash equivalents 3,049.5  3,049.5  Loans and borrowings (Current and Non-Current) 0.0  0.0  0.0  (7,935.7) (7,935.7) (7,968.8) (247.8) (8,216.6) Unsecured bond issues (7,248.5) (7,248.5) (7,476.8) (247.8) (7,724.6) Unsecured financial bank loans and other loans (492.0) (492.0) (492.0) (492.0) Lease liabilities (118.8) (118.8) Accrued interests (76.4) (76.4) Trade and other payables (3,696.4) (3,696.4) Total 7.0 399.4 3,957.5 (11,632.0) (7,268.2) n.r. n.r. n.r. n.r. Balance at 31 December<span class=\"_ _2\"></span> 2022<span class=\"ls0\"> </span>Other financial assets 7.0  296.1  33.8  336.9  226.6  76.4  303.1  Equity instru<span class=\"_ _e\"></span>ments at fa<span class=\"_ _2\"></span>ir value through other comprehensive income 76.4  76.4  76.4  76.4  Equity instruments at fair value through income 7.0  7.0  7.0  7.0  Derivatives 219.7  219.7  219.7  219.7  Regulatory assets 33.8  33.8  Trade and other receivables (Current and Non-current) 1,367.1  1,367.1  Cash and cash equivalents 4,151.2  4,151.2  Loans and borrowings (Current and Non-Current) 0.0  0.0  0.0  (8,582.8) (8,582.8) (8,183.4) (172.9) (8,356.3) Unsecured bond issues (7,243.0) (7,243.0) (7,015.7) (172.9) (7,188.6) Unsecured financial bank loans and other loans (1,167.7) (1,167.7) (1,167.7) (1,167.7) Lease liabilities (90.2) (90.2) Accrued interests (81.9) (81.9) Other non-current liabilities  (24.7) (24.7) out of which, <span class=\"ff48\">Derivatives</span> (24.7) (24.7) (24.7) (24.7) Trade and other payables (4,804.2) (4,804.2) Total 7.0 2<span class=\"ls104\">71<span class=\"_ _e\"></span></span>.4 5,552.1 (13,387.0) (7,556.5) n.r. n.r. n.r. n.r. The above t<span class=\"_ _2\"></span>ables do not include fair value information for financial assets and liabilities not measured at fair value, such as cash and cash equ<span class=\"_ _2\"></span>ivalents, trade and other receivables, and trade and other payables, as their carrying amount is a reasona<span class=\"_ _e\"></span>ble approximation of fair value<span class=\"_ _2\"></span>. We consider that the carrying amount approxi<span class=\"_ _e\"></span>mates the fair value considering the financial and short-te<span class=\"_ _e\"></span>rm nature. FAIR VALUE HI<span class=\"_ _e\"></span>ERARCHY<span class=\"ff3f\"> </span>Fair va<span class=\"_ _2\"></span>lue is the amount for which an asset could be exchanged or a liability settled in an arm's-le<span class=\"_ _e\"></span>ngth transaction. IFRS 7 requires,<span class=\"_ _2\"></span> for financial instrume<span class=\"_ _2\"></span>nts that are measured in the s<span class=\"_ _e\"></span>tatement of financial position at fair value and for financial instruments measured at amortised cost for which<span class=\"_ _2\"></span> the fair value has been disclosed<span class=\"_ _e\"></span>, the disclosure of fair value measurements by level in the following fair value measurement hierarch<span class=\"_ _2\"></span>y: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 1: <span class=\"ff3f\">The fair value of a financial instrument that is traded in an active <span class=\"_ _e\"></span>market is measured based on quoted (unadjusted) </span></span></span>prices for iden<span class=\"_ _2\"></span>tical assets or liabilities. A market is considered active if quoted prices are readily and regularly availabl<span class=\"_ _e\"></span>e from an exchange, dea<span class=\"_ _2\"></span>ler, broker, industry group, pricing service or regulatory agency, and those prices represent actual a<span class=\"_ _e\"></span>nd regularly occurring market transa<span class=\"_ _2\"></span>ctions on an arm\u2019s<span class=\"ff3f\">-length basis.<span class=\"_ _e\"></span> </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 2: <span class=\"ff3f\">The fair value of financial instruments that are not traded in an active market is determined usin<span class=\"_ _e\"></span>g valuation techniques. </span></span></span>These maximise the use of observable market data where these are available and rely as little as possible on entity-specific estimates.<span class=\"_ _2\"></span> If all significant inputs required to assess the fair value of an instrument are observable, either directly (i.e.<span class=\"_ _e\"></span> as prices) or indirectly (<span class=\"_ _2\"></span>i.e. derived from prices), the instrument is included in level 2.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 3: <span class=\"ff3f\">If one or more of the significant inputs used in applying the valuation technique is not based on observable market data, </span></span></span>the finan<span class=\"_ _2\"></span>cial instrument is included in level 3. T<span class=\"ff42\">h<span class=\"_ _e\"></span>e fair value amount included under \u2018Other financial assets\u2019 ha<span class=\"_ _2\"></span>s been determined </span>by referring<span class=\"_ _2\"></span> to either: (i) recent transaction prices, known <span class=\"_ _e\"></span>by the group; for similar financial assets or (ii) valuation reports issued by third partie<span class=\"_ _2\"></span>s. The fa<span class=\"_ _2\"></span>ir value of financial assets and liabilities, other than those presented in the above table, approximates to their carrying amounts largely due to the sh<span class=\"_ _2\"></span>ort-term maturities of these instrume<span class=\"_ _e\"></span>nts. The fa<span class=\"_ _2\"></span>ir value of other financial assets decreased by \u20ac115.6 million compar<span class=\"_ _e\"></span><span class=\"ff3f\">ed to previous year. The decrease mainly results from the </span>fair value<span class=\"_ _2\"></span> of the future contracts entered into by 50Hertz for the purpose of reducing the risk of fluctuations in the expected amount of grid losses <span class=\"ff42\">(\u20ac154,4 m<span class=\"_ _2\"></span>illion end of 2022 compared to \u20ac355.6 m<span class=\"ff3f\">illion last year). This decrease is partly offset by the positive value </span></span>accounted for<span class=\"_ _2\"></span> in Belgium in connection with the pre-<span class=\"_ _e\"></span>hedging of probable forecast debt transa<span class=\"_ _2\"></span>ctions (bonds issuance). The fair value of these derivatives amounted<span class=\"_ _2\"></span> to \u20ac65.3 million. <span class=\"ff3f\">The </span>fair v<span class=\"_ _e\"></span>alue of the Sicav and the group\u2019s stake in EEX increased following rea<span class=\"_ _2\"></span>ssessment of the fair valu<span class=\"_ _2\"></span>e of EEX. Despite a lo<span class=\"_ _2\"></span>wer pricing on the market, the fair value of the bank loans and bond issues increased by \u20ac139.7 million, due to t<span class=\"_ _e\"></span><span class=\"ff3f\">he higher </span>nominal va<span class=\"_ _2\"></span>lue (additional Green Bond in Germany).<span class=\"_ _e\"></span> The fa<span class=\"_ _2\"></span>ir value of sicavs falls into level 1, i.e. valuation is b<span class=\"_ _e\"></span>ased on<span class=\"_ _2\"></span> the listed market price on an active market for identical instruments.<span class=\"_ _20\"></span> The derivative<span class=\"_ _2\"></span> from the price hedge for grid loss procu<span class=\"_ _e\"></span>rement, which is measured at fair value in OCI without affe<span class=\"_ _2\"></span>cting profit or loss, falls under<span class=\"_ _2\"></span> level 1 of the measurement hierarchy. Its value is determined on the basis of the reporting date valuation of the exist<span class=\"_ _e\"></span>ing futures contract<span class=\"_ _2\"></span>s, which are fully contracted via the EEX electricit<span class=\"_ _e\"></span>y exchange and quo<span class=\"_ _2\"></span>ted there. Credit and default risks are avoided with this form o<span class=\"_ _2\"></span>f price hedging via exchange transactions. A<span class=\"_ _e\"></span>t December 31, 2022, the Group reported derivative financia<span class=\"_ _2\"></span>l ins<span class=\"_ _e\"></span>truments in a net amoun<span class=\"_ _2\"></span>t of \u20ac129.6 million. The futures contracts were concluded during the fiscal year at prices between \u20ac61 and \u20ac295 per MWh. As a result of the vo<span class=\"_ _2\"></span>latile price development on the electricity market, a differentiated picture emerged on the balance sheet dat<span class=\"_ _e\"></span>e: Futures for 2023 were still con<span class=\"_ _2\"></span>tracted at advantageous hedging prices and show a positive market value (\u20ac 154.3 million) on the balance s<span class=\"_ _e\"></span><span class=\"ff3f\">heet </span>date, while<span class=\"_ _2\"></span> the futures positions already contracted for 2024 show a negative market value (\u20ac <span class=\"_ _e\"></span><span class=\"ff3f\">-24.7 million) as a result of the price </span>decline shortly be<span class=\"_ _2\"></span>fore the end of 2022. At the balance sheet date, the Group had already hedged a volume of 2.9 TWh for its ex<span class=\"_ _e\"></span>pected physical requirements for grid loss <span class=\"_ _2\"></span>energy in subsequent <span class=\"_ _e\"></span>years. The fa<span class=\"_ _2\"></span>ir value of the bonds is \u20ac7.<span class=\"ff3f ls5b\">036<span class=\"_ _e\"></span><span class=\"ls0\">.5 million (pr</span></span>ior year: <span class=\"_ _e\"></span>\u20ac7.<span class=\"ff3f ls5b\">724<span class=\"ls0\">,6 million). Fair value was determined by reference to published price </span></span>quotations in an active marke<span class=\"_ _2\"></span>t (classified as level 1 in the <span class=\"_ _e\"></span>fair value<span class=\"_ _2\"></span> hierarchy). The fair value of the registered bond is <span class=\"_ _e\"></span><span class=\"ff42\">\u20ac37.2 million</span> <span class=\"ls5b\">as</span> of 31 December 2022 and was determined by reference to third party information, <span class=\"_ _2\"></span>such as pricing services (classified as level 3 in the fair value<span class=\"_ _2\"></span> hierarchy). The fair value of the private placement amounts to <span class=\"ff42\">\u20ac</span>1<span class=\"ls5b\">33<span class=\"_ _e\"></span></span>.2 million (classified as level 3 in the fair value hierarchy).<span class=\"_ _e\"></span> The fa<span class=\"_ _2\"></span>ir value of other bank loans approximates to their carrying amounts largely due to the short-t<span class=\"_ _e\"></span>erm maturities of these instruments. Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.19. <span class=\"_ _92\"> </span>Le<span class=\"_ _e\"></span>asing THE <span class=\"_ _e\"></span>GROUP AS A LESSEE The <span class=\"_ _20\"></span>group <span class=\"_ _5d\"></span>mainly <span class=\"_ _20\"></span>leases <span class=\"_ _5d\"></span>buildings, <span class=\"_ _5d\"></span>cars <span class=\"_ _20\"></span>and <span class=\"_ _5d\"></span>optical <span class=\"_ _5d\"></span>fibres. <span class=\"_ _20\"></span>It <span class=\"_ _5d\"></span>also <span class=\"_ _5d\"></span>has <span class=\"_ _20\"></span>some <span class=\"_ _5d\"></span>rights <span class=\"_ _20\"></span>to <span class=\"_ _5d\"></span>use <span class=\"_ _20\"></span>(<span class=\"_ _e\"></span>portions) <span class=\"_ _20\"></span>of <span class=\"_ _5d\"></span>land <span class=\"_ _5d\"></span>and <span class=\"_ _5d\"></span>overh<span class=\"_ _2\"></span>ead <span class=\"_ _5d\"></span>li<span class=\"_ _e\"></span>nes. <span class=\"_ _5d\"></span>The<span class=\"_ _e\"></span> valuation period <span class=\"_ _e\"></span>used is <span class=\"_ _e\"></span>based <span class=\"_ _e\"></span>on <span class=\"_ _e\"></span>the cont<span class=\"_ _e\"></span>ractual ter<span class=\"_ _e\"></span>m. <span class=\"_ _e\"></span>Where a <span class=\"_ _e\"></span>fixed <span class=\"_ _e\"></span>term has<span class=\"_ _e\"></span> not <span class=\"_ _e\"></span>been s<span class=\"_ _e\"></span>et <span class=\"_ _e\"></span>and <span class=\"_ _e\"></span>an <span class=\"_ _e\"></span>ongoing ext<span class=\"_ _e\"></span>ension is <span class=\"_ _e\"></span>subject to <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>he contract<span class=\"_ _2\"></span>, <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>he <span class=\"_ _e\"></span>relevant <span class=\"_ _e\"></span>depa<span class=\"_ _e\"></span>rtment <span class=\"_ _e\"></span>has <span class=\"_ _e\"></span>set <span class=\"_ _20\"></span>an <span class=\"_ _e\"></span>assumed <span class=\"_ _e\"></span>termination <span class=\"_ _e\"></span>date. <span class=\"_ _20\"></span>In <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>even<span class=\"_ _2\"></span>t <span class=\"_ _e\"></span>that <span class=\"_ _20\"></span>the l<span class=\"_ _e\"></span>ease <span class=\"_ _e\"></span>contract <span class=\"_ _e\"></span>c<span class=\"_ _e\"></span>ontains <span class=\"_ _e\"></span>a <span class=\"_ _e\"></span>lease <span class=\"_ _e\"></span>ext<span class=\"_ _e\"></span>ension<span class=\"_ _e\"></span> option, the group<span class=\"_ _2\"></span> assesses whether it is reasonabl<span class=\"_ _e\"></span>y certain <span class=\"ls5b\">of</span> exercising the option and makes its best estimate of the termination date. The COVID-<span class=\"ls78\">19<span class=\"_ _2\"></span><span class=\"ls0\"> <span class=\"ff42\">pandemic <span class=\"_ _2\"></span>did not affected the contractual clauses of Elia Group\u2019s le<span class=\"ff3f\">ase contracts and there were no<span class=\"_ _e\"></span> indications leading </span></span></span></span>to changes in the asse<span class=\"_ _2\"></span>ssment (which was <span class=\"_ _e\"></span>used in the previous reporting period) related to the extension of the contracts.<span class=\"_ _e\"></span> Information abou<span class=\"_ _2\"></span>t leases for which the g<span class=\"_ _e\"></span>roup is a lessee is prese<span class=\"_ _2\"></span>nted below.<span class=\"_ _e\"></span> Right-<span class=\"ls105\">of</span>-use assets<span class=\"ff3f fs8\"> </span>Right-<span class=\"ls5b\">of</span>-<span class=\"ff42\">use assets are presented separately within \u2018Property, plant and equ<span class=\"_ _2\"></span>ipment\u2019<span class=\"ff3f\"> <span class=\"_ _e\"></span><span class=\"ls5b\">and </span>c<span class=\"_ _e\"></span>an be broken down in the table below<span class=\"ls1d\">, </span>with the </span></span>discounted lease liability for<span class=\"_ _2\"></span> comparison. The split betwee<span class=\"_ _e\"></span>n current and non-current lease liabilities also provided:<span class=\"_ _e\"></span> Use of<span class=\"_ _2\"></span> land and Rent of (in \u20ac million)<span class=\"ff40\"> </span>overhead buildings / lines offices Cars Optical fiber Other Total As of 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 40.0  23.6  14.1  3.7  1.4  82.8  Additions and remeasurements 3.4  16.7  6.1  23.4  0.0  49.6  Depreciation (1.2) (5.3) (5.5) (2.6) (0.2) (14.8) Derecogn<span class=\"_ _2\"></span>ition of right<span class=\"_ _e\"></span>-<span class=\"ls5b\">of</span>-use assets 0.0  (0.0) (0.0) 0.0  0.0  (0.0) As of 31 Dece<span class=\"_ _2\"></span>mber 2021<span class=\"_ _e\"></span> 42.1 35.0 14.7 24.5 1.2 117.5 Use of<span class=\"_ _2\"></span> land and Rent of (in \u20ac million)<span class=\"ff40\"> </span>overhead buildings / lines offices Cars Optical fiber Other Total As of 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 42.1  34.9  14.7  24.5  1.1  117.5  Additions and remeasurements 1.3  (0.1) 4.7  0.2  0.4  6.5  Depreciation (1.3) (6.0) (5.6) (0.5) (0.1) (13.5) Derecogn<span class=\"_ _2\"></span>ition of right<span class=\"_ _e\"></span>-<span class=\"ls5b\">of</span>-use assets 0.0  (0.0) (0.1) (22.0) 0.0  (22.1) As of 31 Dece<span class=\"_ _2\"></span>mber 2022<span class=\"_ _e\"></span> 42.2 28.9 13.7 2.3 1.5 88.5 The r<span class=\"_ _2\"></span>ight-<span class=\"ls78\">of</span>-u<span class=\"_ _2\"></span>se assets are briefly described below:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> use of land and overhead lines constitutes a right for the group to use a well identified piece of land to build <span class=\"ff42\">on someone\u2019s </span></span></span>property. On<span class=\"_ _2\"></span>ly the contracts under which t<span class=\"_ _e\"></span>he group has the full righ<span class=\"_ _2\"></span>t to control the use of the identified asset are in scope.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> <span class=\"ls78\">gr<span class=\"ls5b\">oup</span></span> leases buildings and offices in which<span class=\"_ _2\"></span> corporate functions are performed.<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> group has car leasing contracts which are used by employees for business and private activities.<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> group leases optical fibres to transmit data. Only cables that are clea<span class=\"_ _e\"></span>rly identified are in scope. </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Other<span class=\"_ _2\"></span> lease contracts: printer lease contracts and strategic reserves contracts. Strategic reserves are contracts where the Gro<span class=\"_ _e\"></span>up </span></span>has the right <span class=\"_ _2\"></span>to control the use of a power plant to maintain a balance on the grid.<span class=\"_ _e\"></span> The g<span class=\"_ _2\"></span>roup only <span class=\"_ _2\"></span>has lease <span class=\"_ _2\"></span>contracts with <span class=\"_ _4b\"></span>fixe<span class=\"_ _e\"></span>d lease <span class=\"_ _2\"></span>payments and <span class=\"_ _2\"></span>assesses whether <span class=\"_ _2\"></span>it <span class=\"_ _2\"></span>is reasonable <span class=\"_ _2\"></span>to extend a <span class=\"_ _4b\"></span>le<span class=\"_ _e\"></span>ase contract<span class=\"_ _2\"></span>. If <span class=\"_ _2\"></span>so, the lease contract is va<span class=\"_ _2\"></span>lued as if the extension were exercised. Lease liabilities<span class=\"ff3f fs8\"> </span>Information concerning the ma<span class=\"_ _2\"></span>turity of the contractual undiscounted cash flows is p<span class=\"_ _e\"></span>rovided below: Matu<span class=\"_ _2\"></span>rity analysis - contractual undiscounted cash flow<span class=\"_ _e\"></span>s (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>&lt; 1 year 14.2  32.9  1-5 years 35.1  30.2  &gt; 5 years 54.1  58.0  Total undiscount<span class=\"_ _2\"></span>ed lease liabilities at 31 December<span class=\"_ _e\"></span> 103.4 121.1 Lease liabilities in<span class=\"_ _2\"></span> the statement of financial position at 31 December<span class=\"_ _e\"></span> 90.2 118.8 Curren<span class=\"_ _2\"></span>t 13.2  35.1  Non-current 77.0  83.7  The d<span class=\"_ _2\"></span>iscount rate used to discount the lease liabilities is the g<span class=\"ff42\">roup\u2019s best estimate of the weighted average incremental borrowing rate. </span>The group<span class=\"_ _2\"></span> made use of the practical expedients, i.e. a single discount rate per group of contracts, summarised per their duration.<span class=\"_ _20\"></span> The group<span class=\"_ _2\"></span> has assessed the extension options concluded<span class=\"_ _e\"></span> in the lea<span class=\"_ _2\"></span>se contracts and considers it reasonably likely that these extension options will be<span class=\"_ _2\"></span> executed. The Group has therefore considered the lease contract as if the extension option is exercised in the<span class=\"_ _e\"></span> lease liability.  The group<span class=\"_ _2\"></span> has no lease contracts with variable payments <span class=\"_ _e\"></span>nor r<span class=\"_ _2\"></span>esidual value guarantees. The <span class=\"_ _e\"></span>group did not commit to any lease that has not yet commenced. The group has no contracts <span class=\"_ _2\"></span>which in<span class=\"_ _e\"></span>clude contingent rental payments nor include any escalation clauses or restriction<span class=\"_ _2\"></span>s that are significant <span class=\"_ _e\"></span>regarding the use of the asset in question.  In 2021, an optical fibre lea<span class=\"_ _2\"></span>se contract coming to maturity was prolonged and a purchase option for a value of \u20ac22.0 million<span class=\"_ _e\"></span><span class=\"ff3f\"> was added. </span>The purcha<span class=\"_ _2\"></span>se option came to <span class=\"_ _e\"></span>maturity at the end of February 2022 and the group exercised the option.<span class=\"_ _e\"></span><span class=\"ff40 fs11\"> </span>Amounts recognised in profit and loss<span class=\"ff3f fs8\"> </span>The fo<span class=\"_ _2\"></span>llowing amounts were recognised in profit and loss for the financial year: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Depreciation expense o<span class=\"_ _2\"></span>f right-<span class=\"ls5b\">of</span>-<span class=\"_ _e\"></span>use assets<span class=\"_ _e\"></span> 13.3  14.7  Intere<span class=\"_ _2\"></span>st on lease liabilities<span class=\"_ _e\"></span> 1.3  1.8  Expenses re<span class=\"_ _2\"></span>lating to short-term leases<span class=\"_ _e\"></span> 0.2  0.7  Expenses re<span class=\"_ _2\"></span>lating to low-value assets<span class=\"_ _e\"></span> 0.4  0.5  Total recognised in p<span class=\"_ _2\"></span>rofit and loss 15.1 17.8 A total of \u20ac<span class=\"_ _2\"></span>15.1 <span class=\"_ _e\"></span><span class=\"ff3f\">million in lease expenses was recognised in the statement of profit or loss in 2022. There were no variable lease </span>paymen<span class=\"_ _2\"></span>ts included in the measurement of lease liabilities.<span class=\"_ _e\"></span> The total cash<span class=\"_ _2\"></span> outf<span class=\"ff42\">low for leases amounted to \u20ac13.3 millio<span class=\"_ _e\"></span>n in 2022 (\u20ac15.4 million </span>in 2021). <span class=\"ff42\">This amount is included in the \u201cRepayment </span>of borrowings\u201d of the cash<span class=\"_ _2\"></span> flow statement.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>THE GROUP AS A LESSOR<span class=\"ff3f\"> </span>The group<span class=\"_ _2\"></span> leases out optical fibres, land and buildings, which are <span class=\"ff42\">presented as part of \u2018Property, plant and equipment\u2019. Leasing is </span>only an ancillar<span class=\"_ _2\"></span>y business. Rental income is presented under \u2018<span class=\"_ _e\"></span>Other income\u2019.<span class=\"ff3f\"> </span>Contracts <span class=\"_ _2\"></span>that do not relate to separately identifiable asse<span class=\"_ _e\"></span>ts or under wh<span class=\"_ _2\"></span>ich the customer cannot directly the use of the ass<span class=\"_ _e\"></span>et or does not substantia<span class=\"_ _2\"></span>lly obtain all the economic benefits associated <span class=\"_ _e\"></span>with the use of the asset do not con<span class=\"_ _2\"></span>stitute a lease. The ne<span class=\"_ _e\"></span>w lease de<span class=\"_ _2\"></span>finition led to the e<span class=\"_ _2\"></span>xclusion of some telecommunication equipment<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> has classified these leases as operating leases as they do not substantially transfer all the <span class=\"_ _e\"></span>risks and rewards incidental to the ownership<span class=\"_ _2\"></span> of the assets.  The fo<span class=\"_ _2\"></span>llowing table sets out a maturity analysis of lease payments, showing the undiscounted lease payments to be received af<span class=\"_ _e\"></span>ter the repor<span class=\"_ _2\"></span>ting date and considering the best estimate of the co<span class=\"_ _e\"></span>ntractual term:<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Within 1 year 13.4  12.9  1 to 2 years 12.7  12.2  2 to 3 years 15.0  12.1  3 to 4 years 12.2  12.0  4 to 5 years 16.7  11.9  More than 5 year<span class=\"_ _2\"></span>s 304.3  308.6  Total 374.2 369.8 The COVID-19 pandemic d<span class=\"_ _2\"></span>id <span class=\"ff42\">not affected the contractual clauses of Elia Group\u2019s contracts as a lessor and there were no indicators to </span>change the ca<span class=\"_ _2\"></span>sh flows as mentioned here above.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> <span class=\"ff42\">recognised \u20ac</span><span class=\"ls5b\">15</span>.2 <span class=\"_ _e\"></span>million in re<span class=\"ff42\">ntal income in 2022 (2021: \u20ac15.0</span> million). 6.20. <span class=\"_ _92\"> </span>Accruals<span class=\"_ _e\"></span> and deferred income (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Accruals and<span class=\"_ _2\"></span> deferred income 91.4 11.4 Deferra<span class=\"_ _2\"></span>l account from settlement mechanism Belgian regulatory framework<span class=\"_ _e\"></span> 360.6 353.5 Deferra<span class=\"_ _2\"></span>l account from settlement mechanism German regulatory framework<span class=\"_ _e\"></span> 131.3 444.9 Total 583.3 809.8 The movements in the deferral account from the settlement mechanism are as follows: (in \u20ac million)<span class=\"ff40\"> </span>Regulatory Regulatory Total claims obligations Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 92.9 (891.3) (798.4) Increase 787.8 (786.7) 1.1 Reversals (5.9) 122.6 116.7 Utilisation 0.0 125.7 125.7 Other (e.g. discoun<span class=\"_ _2\"></span>ting)<span class=\"_ _e\"></span> 0.6 62.4 63.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 875.3 (1,367.2) (491.9) In the <span class=\"ff40\">Elia<span class=\"_ _2\"></span> Transmission segment<span class=\"ff3f\">, the deferral account from the <span class=\"ff42\">settlement mechanism (\u20ac3</span><span class=\"ls5b\">60<span class=\"_ _e\"></span></span>.6 million) decreased compared with </span></span>year end 2021 <span class=\"ff42 ls8f\">(\u20ac</span><span class=\"ls5b\">353</span>.5 million). The decrease in the defer<span class=\"_ _e\"></span>ral account fr<span class=\"_ _2\"></span>om the settle<span class=\"_ _e\"></span>ment mechanism encompasses the settlement of net surpluses from the pr<span class=\"_ _2\"></span>ior tariff period (-<span class=\"ff42\">\u20ac1<span class=\"_ _e\"></span>25.7 million), the review of the regulator on previou<span class=\"_ _2\"></span>s year\u2019<span class=\"ff3f\">s </span>s<span class=\"_ _e\"></span>ettlement mechanism (+\u20ac<span class=\"ff3f\">6.2 </span></span>million) and the operating surplu<span class=\"_ _2\"></span>s generated in the curren<span class=\"_ _e\"></span>t year over the budget approved by the re<span class=\"ff42\">gulator (+\u20ac130.8 million)</span>. Any opera<span class=\"_ _2\"></span>ting surplus/deficit, in relation to the budget of the costs and revenues authorised by the regulator, needs to be returned to<span class=\"ls0\">/refunded by the consumers and therefore does not form part of the revenues.  </span>In 2022, there w<span class=\"ff42\">as an operational surplus (<span class=\"_ _2\"></span>\u20ac 130.8<span class=\"ff3f\"> million<span class=\"_ _e\"></span>), reported as an additional regulatory obligation. This operating excess is </span></span>primar<span class=\"_ _2\"></span>ily a result of higher <span class=\"ff42\">tariff sales (\u20ac247.0 million) and non</span>-<span class=\"ff42\">co<span class=\"_ _e\"></span>ntrollable revenue (\u20ac396.7 million) driven b<span class=\"_ _2\"></span>y the cr<span class=\"_ _e\"></span>oss<span class=\"_ _e\"></span><span class=\"ff3f\">-border revenue </span></span>partly off<span class=\"_ _2\"></span>set by increased non controllable costs. <span class=\"_ _e\"></span> In the <span class=\"ff40\">50Hertz Transmission segment</span>, the deferral accounts from the <span class=\"ff42\">settlement mechanism (\u20ac</span><span class=\"ls5b\">131</span>.3 million) is th<span class=\"_ _e\"></span>e nominal amount of \u20ac<span class=\"ff3f ls5b\">209<span class=\"ls0\">.3 </span></span>million (\u20ac4<span class=\"ff3f ls5b\">47<span class=\"ls0\">.1 </span></span>million as of 31 December 2021) le<span class=\"_ _e\"></span>ss an interest e<span class=\"_ _2\"></span>ffect of \u20ac<span class=\"_ _e\"></span><span class=\"ff3f ls5b\">78<span class=\"ls0\">.0 million </span></span>(\u20ac2.2 million in 2021)<span class=\"ff3f\">.<span class=\"_ _e\"></span> The net position </span>decrea<span class=\"_ _2\"></span>sed compared to year end 2022 <span class=\"_ _e\"></span><span class=\"ff42 ls8f\">(\u20ac</span>444.9 million).  The release<span class=\"_ _2\"></span> of the deferral account is determined in the tariff setting process. The a<span class=\"_ _e\"></span>mounts on the deferral account are recognised on a yearly ba<span class=\"_ _2\"></span>sis and the release depends on the source of the deferral, some are released in T+1, whilst <span class=\"_ _e\"></span>others are released in T+2 and some are re<span class=\"_ _2\"></span>leased after a longer period<span class=\"_ _e\"></span> of time. The future<span class=\"_ _2\"></span> release of the deferral account fr<span class=\"_ _e\"></span>om the settlement mecha<span class=\"_ _2\"></span>nism to the future tariffs is set out in the table below (situ<span class=\"_ _e\"></span>ation on 31 December 2022): (in \u20ac million)<span class=\"ff40\"> </span>Belgian regu<span class=\"_ _2\"></span>latory German regulatory framework framework To be<span class=\"_ _2\"></span> refunded to the tariffs in the current regulatory peri<span class=\"_ _e\"></span>od 156.7  102.6  To be<span class=\"_ _2\"></span> refunded to the tariffs in the next regulatory period (or after)<span class=\"_ _e\"></span> 200.8  28.6  Other regula<span class=\"_ _2\"></span>tory transfer<span class=\"_ _e\"></span> 3.1  0.0  Total regu<span class=\"_ _2\"></span>latory deferr<span class=\"_ _e\"></span>al account 360.6 131.3 *Belgium: from 2020 to 2023 ;  Germany: from 2019 to 2023 The o<span class=\"_ _2\"></span>ther regulatory transfer relates to a revenue from incentive regulation which is subject to uncertainty in the particula<span class=\"_ _e\"></span>r context of a significant increase of energy <span class=\"_ _2\"></span>prices and for which the calculation method <span class=\"_ _e\"></span>should be further assessed with the Belgian regulator<span class=\"fs11 fc21\">.<span class=\"_ _e\"></span> </span>7.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Group structure </span>OVERVIEW OF GROUP STRUCTURE SUBSIDI<span class=\"_ _e\"></span>ARIES Elia Group SA/NV has direct and indire<span class=\"_ _2\"></span>ct control of the subsidiaries listed below.<span class=\"_ _e\"></span> Elia Grid International Pte L<span class=\"_ _2\"></span>td (Singapore) ceased its ope<span class=\"_ _e\"></span>rations in June 2022. A new subsid<span class=\"_ _2\"></span>iary has been created in Canada, Elia Grid Internationa<span class=\"_ _2\"></span>l Inc. This subsidiary will <span class=\"_ _e\"></span>coordinate the activities of Elia Grid Internationa<span class=\"_ _2\"></span>l in North America<span class=\"ls95\">. </span> All the entities keep their accounts in<span class=\"_ _2\"></span> euros and <span class=\"_ _e\"></span>have the same reporting date as Elia Group SA/NV. Country of<span class=\"_ _2\"></span> Name Headquarters Stake % establish<span class=\"_ _2\"></span>ment<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Subsid<span class=\"_ _2\"></span>iaries<span class=\"_ _e\"></span> Elia Transm<span class=\"_ _2\"></span>ission Belgium SA/NV Belgium  Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"ff3f\">  </span>99.99 99.99 Elia Asset SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>99.99 99.99 Elia Engineering<span class=\"_ _2\"></span> SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 100.00 Elia Re SA Luxembourg Rue de Merl 6<span class=\"_ _2\"></span>5, 2146 Luxembourg<span class=\"_ _e\"></span> 100.00 100.00 Elia Grid International SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Bussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>90.00 90.00 Elia Grid International Gm<span class=\"_ _2\"></span>BH<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 90.00 90.00 Al Akaria Plaza Olaya Str<span class=\"_ _2\"></span>eet, <span class=\"_ _e\"></span> Elia Grid International LL<span class=\"_ _2\"></span>C<span class=\"_ _e\"></span> Saudi Arabia Al Olaya Riyadh 1<span class=\"_ _2\"></span>1622 <span class=\"_ _e\"></span> 90.00 90.00 Elia Grid International Pte. <span class=\"_ _2\"></span>Ltd.<span class=\"_ _e\"></span> Singapore 20 Collyer Quay #09-01, Singapore 049319 - 90.00 Elia Grid International In<span class=\"_ _2\"></span>c.<span class=\"_ _e\"></span> Canada 1500<span class=\"ls0\">-850 2 ST SW, T2P0R8 Calgary </span>90.00 - Eurogrid International SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 100.00 Eurogrid GmbH  German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 80.00 80.00 50Hertz Tran<span class=\"_ _2\"></span>smission GmbH <span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 80.00 80.00 50Hertz O<span class=\"_ _2\"></span>ffshore GmbH  German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 80.00 80.00 Re.Alto-Energ<span class=\"_ _2\"></span>y BV/SRL<span class=\"_ _e\"></span> Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 100.00 Re.Alto-Energ<span class=\"_ _2\"></span>y GmbH<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Ratingstra\u00dfe 9<span class=\"_ _2\"></span>, 40213 Dusseldorf<span class=\"_ _e\"></span> 100.00 100.00 WindGrid SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 - Investments accounted fo<span class=\"_ _2\"></span>r using the equity-met<span class=\"_ _e\"></span>hod <span class=\"ff43\">\u2013</span> Joint Ventures Nemo Link Ltd. United Kingdom Strand 1-3, London WC2N 5EH 50.00 50.00 Investments accounted fo<span class=\"_ _2\"></span>r using the equity-met<span class=\"_ _e\"></span>hod <span class=\"ff43\">\u2013</span> Associates H.G.R.T S.A.S.  France 1 Terrasse Be<span class=\"_ _2\"></span>llini, 92919 La D\u00e9fense Cedex<span class=\"_ _e\"></span> 17.00 17.00 Coreso SA/NV Belgium Avenue de<span class=\"_ _2\"></span> Cortenbergh 71, 1000 Brussels<span class=\"_ _e\"></span> 22.16 22.16 Investments accounted fo<span class=\"_ _2\"></span>r using IFRS9 - o<span class=\"_ _e\"></span>ther shareholdings JAO SA Luxembourg 2, Rue de Bitbourg, 1273 Lu<span class=\"_ _2\"></span>xembourg Hamm<span class=\"_ _e\"></span> 7.20 7.20 European Energ<span class=\"_ _2\"></span>y Exchange (EEX)<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Augustusplatz<span class=\"_ _2\"></span> 9, 0409 Leipzig<span class=\"_ _e\"></span> 4.32 4.32 TSCNET Services Gm<span class=\"_ _2\"></span>bH<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Dingolfinger Strasse<span class=\"_ _2\"></span> 3, 81673 Munich<span class=\"_ _e\"></span> 5.36 5.36 Kurt-Sanderling-Akademie des Konzerthausorchester<span class=\"_ _2\"></span> Berlin<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Gendarmenmarkt<span class=\"_ _2\"></span>, 10117 Berlin<span class=\"_ _e\"></span> 8.32 8.32 8.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Other notes</span>8.1. <span class=\"_ _87\"> </span>Financial risk and derivative management  PRINCI<span class=\"_ _e\"></span>PLES OF FINA<span class=\"_ _2\"></span>NCIAL RISK MANAGEMENT The Group aims to<span class=\"_ _2\"></span> identify each risk and sets out strategi<span class=\"_ _e\"></span>es to control the<span class=\"ls1c\">ir</span> economic impact on the Group's results. The Risk M<span class=\"_ _2\"></span>anagement Department defines the <span class=\"_ _e\"></span>risk management strategy, monitors risk analyses and reports to management and the Audit Committee. The fin<span class=\"_ _2\"></span>ancial risk policy is implemented by determining appropriate policies and setting up effective control and repor<span class=\"_ _2\"></span>ting procedures. Selected derivative hedging instru<span class=\"_ _e\"></span>ments are used depend<span class=\"_ _2\"></span>ing on the assessment of the risk involved. Deriv<span class=\"_ _e\"></span>atives are used exclusive<span class=\"_ _2\"></span>ly as hedging instruments. The regulatory framework in which the Group operates significantly restricts thei<span class=\"_ _e\"></span>r effects on profit or lo<span class=\"_ _2\"></span>ss (see the section 'Regulatory framework and tariffs'). The major impact of increased interest rates, c<span class=\"_ _e\"></span>redit risk, etc. can be settled in the tariffs, in a<span class=\"_ _2\"></span>ccordance with the applicable legi<span class=\"_ _e\"></span>slation. MARKET RISK The market risk take<span class=\"_ _2\"></span>s into account negative effects on the financial positi<span class=\"_ _e\"></span>on and cash flows of the group arising as a result of price changes on the market which cannot be otherwise avoided. The activities o<span class=\"_ _2\"></span>f the grou<span class=\"_ _e\"></span>p extend to the ele<span class=\"_ _2\"></span>ctricity mark<span class=\"_ _e\"></span>et <span class=\"ff42\">\u2013</span> in particular through selling<span class=\"_ _2\"></span> the electricity generated from renewa<span class=\"_ _e\"></span>ble energy as well as the procurement of energy to cover grid energ<span class=\"_ _2\"></span>y losses <span class=\"ff42\">\u2013</span> <span class=\"_ _e\"></span>as well as to th<span class=\"_ _2\"></span>e market for short-term deposits. In Germany, t<span class=\"ls5b\">he </span>gr<span class=\"_ _e\"></span>oup counteracts the procurement price risk for grid loss energy by hedging<span class=\"_ _2\"></span> prices at an early stage using futures contracts on the EEX electricity exchange<span class=\"_ _20\"></span> Foreign curren<span class=\"_ _e\"></span>cy risk<span class=\"_ _2\"></span> <span class=\"_ _251\"> </span> The group<span class=\"_ _2\"></span> is not exposed to any significant currency risk, <span class=\"_ _e\"></span>either from transa<span class=\"_ _2\"></span>ctions or from exchanging foreign currencies into euro, si<span class=\"_ _e\"></span>nce it has no material foreign investments or activities and less than 1<span class=\"_ _2\"></span>% of its costs are expressed in currencies other than euro<span class=\"_ _e\"></span>s. Inter<span class=\"_ _e\"></span>est rate risk<span class=\"_ _2\"></span> Intere<span class=\"_ _2\"></span>st rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of c<span class=\"_ _e\"></span>hanges in market interest rate<span class=\"_ _2\"></span>s. The Group's exposure to the risk of changes in market interest rates relates prima<span class=\"_ _e\"></span>rily to its long-term debt obligations with floating interest<span class=\"_ _2\"></span> rates. As at 31 December 2022, 5 interest<span class=\"_ _e\"></span>-rate swaps were outstanding in connection with pre-hedgi<span class=\"_ _e\"></span>ng of probable forecasted debt transactions. T<span class=\"_ _2\"></span>he interest rate swaps on the other loan and the loan with Publi-Part to cover a nominal debt amount of \u20ac300 m<span class=\"_ _2\"></span>illion were settled in June 2020, together with the repayment of the loans. <span class=\"_ _e\"></span><span class=\"ff3f\"> </span>See Note 6.13 for a summa<span class=\"_ _2\"></span>ry of the outstanding loans an<span class=\"_ _e\"></span>d their respective interest rates. CREDIT RISK Credit risk encompasses a<span class=\"_ _2\"></span>ll forms of counterparty exposure, i.e. where counterparties may default on their obligations to the group in relation to lend<span class=\"_ _2\"></span>ing, hedging, settlement and other financial activities. The group is exposed to credit risk from its op<span class=\"_ _e\"></span>erating activities and treasur<span class=\"_ _2\"></span>y activities. With regards <span class=\"ls1d\">to<span class=\"_ _e\"></span></span> its operating activities, the group <span class=\"ff42\">has a credit policy in place, which takes into account cu<span class=\"_ _2\"></span>stomer\u2019s risk </span>profiles. The e<span class=\"_ _2\"></span>xposure to credit risk is monitored on an ongoing basis, resulting in a request to issue bank guaranties from t<span class=\"_ _e\"></span>he counterparty<span class=\"_ _2\"></span> for some major contracts.<span class=\"_ _e\"></span> At the end<span class=\"_ _2\"></span> of the reporting period there were no significant concentrations of credit risks. The maximum credit risk is the carrying amoun<span class=\"_ _2\"></span>t for each financial asset, including derivative financial instruments.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Note 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Immedia<span class=\"_ _2\"></span>tely claimable deposits<span class=\"_ _e\"></span> 7.0  7.0  Reimbursemen<span class=\"_ _2\"></span>t rights<span class=\"_ _e\"></span> 34.6  46.2  Other shareholding<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> 75.6  43.8  Derivatives (<span class=\"_ _2\"></span>Current and Non-current)<span class=\"_ _e\"></span> 219.7  355.6  Other financial <span class=\"_ _2\"></span>assets (Current and Non-c<span class=\"_ _e\"></span>urrent) (6.6) 336.9  452.5  Non-current t<span class=\"_ _2\"></span>rade and other r<span class=\"_ _e\"></span>eceivables 95.5  0.5  Trade and other receiv<span class=\"_ _2\"></span>ables (6.9) 1,206.2  861.3  Current tax<span class=\"_ _2\"></span> assets<span class=\"_ _e\"></span> (6.10) 28.6  10.1  Cash and cash<span class=\"_ _2\"></span> equivalents<span class=\"_ _e\"></span> (6.11) 4,151.2  3,049.5  Deferred charges (6.9) 25.1  18.1  Total 5,843.5  4,392.0  The movement in the allowance for expe<span class=\"_ _2\"></span>cted credit losses<span class=\"_ _e\"></span> in relation to trade receivables during the year was as outlined in the table below: <span class=\"_ _15e\"> </span> (in \u20ac million)<span class=\"ff40\"> </span>Bad debtors Impairment losses Remaining ba<span class=\"_ _2\"></span>lance<span class=\"_ _e\"></span> Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 201.5  (201.0) 0.4  Changes during the year (0.1) 0.2  0.1  Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 201.4  (200.8) 0.5  Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 201.4  (200.8) 0.5  Changes during the year 0.8  (0.8) 0.0  Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 202.2  (201.7) 0.5  Almost all bad<span class=\"_ _2\"></span> debtors are related to outstanding receivables <span class=\"_ _e\"></span>linked to the regulatory levies in Germany. If a debtor <span class=\"_ _e\"></span>goes bankrupt, 50Hertz Tran<span class=\"_ _2\"></span>smission is compensated by the reg<span class=\"_ _e\"></span>ulator for the loss incurred. The group<span class=\"_ _2\"></span> believes that the unimpaired amounts overdue by more than 30 <span class=\"_ _e\"></span>days are still collectible, based on historical payment behaviour and extensive an<span class=\"_ _2\"></span>alysis of customer credit risk, including customers' underlying credit ratings, when available. The<span class=\"_ _e\"></span> credit quality of trade<span class=\"_ _2\"></span> and other receivables is assessed based on a credit policy.<span class=\"_ _e\"></span> IFRS 9 requires <span class=\"_ _2\"></span>the group to impair financial assets based on a forward-looki<span class=\"_ _e\"></span>ng expected credit loss (ECL) approach. <span class=\"ff45\"> </span>As of 2022<span class=\"_ _2\"></span>, the group applies an individualized approach for trade receivables, for w<span class=\"_ _e\"></span>hich the Group has set ru<span class=\"_ _2\"></span>les fo<span class=\"_ _e\"></span>r defining the s<span class=\"_ _2\"></span>tage of the concer<span class=\"_ _2\"></span>ned asset for Expected Credit Loss (ECL) ca<span class=\"_ _e\"></span>lculations. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">sta<span class=\"_ _2\"></span>ge 1<span class=\"ff3f\"> covers financial assets that have not deteriorated significantly since initial recognition. The ECL for<span class=\"_ _2\"></span> stage<span class=\"_ _e\"></span> 1 <span class=\"_ _e\"></span>is calculated </span></span></span>on a 12-month basis, \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">sta<span class=\"_ _2\"></span>ge 2<span class=\"ff3f\"> covers financial assets for which the credit risk has significantly increased. The ECL for stage 2 is calculated on a lifetim<span class=\"_ _e\"></span><span class=\"ls5b\">e </span></span></span></span>basis. The decisio<span class=\"_ _2\"></span>n to move an asset from stage 1 to stage 2 is based on certain cr<span class=\"_ _e\"></span>iteria such as:  o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">a significant downgrade in the creditworthiness of a counterparty and/or its parent company and/or its guara<span class=\"_ _2\"></span>ntor (if <span class=\"_ _e\"></span>any), <span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">significant adverse changes in the regulatory environment, </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">changes in political or country-related risks, and  </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">any other aspect the Group may consider relevant.  </span></span>Regarding fina<span class=\"_ _2\"></span>ncial assets that are more than 30 days past due, the move to stage 2 is not systematically applied as long as t<span class=\"_ _e\"></span>he Group has rea<span class=\"_ _2\"></span>sonable and supporting infor<span class=\"_ _e\"></span>mation that demonstrates that, even if payments become more than 30 days past due, this does not repre<span class=\"_ _2\"></span>sent a significant increase in the credit risk since initial recognition.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">sta<span class=\"_ _2\"></span>ge 3<span class=\"ff3f\"> covers assets for which default has already been observed, such as:<span class=\"_ _e\"></span> </span></span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">when there is <span class=\"_ _2\"></span>evidence of failure in cre<span class=\"_ _2\"></span>dit support fr<span class=\"_ _2\"></span>om a parent company to<span class=\"_ _2\"></span> its subsidiary (in t<span class=\"_ _2\"></span>his case th<span class=\"_ _2\"></span>e subsidiary is the </span></span>Group\u2019s counterparty at r<span class=\"_ _2\"></span>isk),<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">when a Group entity has initiated legal proceedings against the counterparty for non-payment.<span class=\"_ _e\"></span> </span></span>Regarding fina<span class=\"_ _2\"></span>ncial assets that are more than 90 days pa<span class=\"_ _e\"></span>st due, the presumption can be<span class=\"_ _2\"></span> rebutted if the Group has reasonable and suppor<span class=\"_ _2\"></span>table information that demonstrates that even if pa<span class=\"_ _e\"></span>yments become<span class=\"_ _2\"></span> more than 90 days past due, this does not<span class=\"_ _e\"></span> indicate counterparty<span class=\"_ _2\"></span> default.<span class=\"_ _e\"></span> The ECL formula<span class=\"_ _2\"></span> applicable in stages 1 and 2 is ECL = E<span class=\"_ _e\"></span>AD x PD x LGD, where: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">for 1<span class=\"_ _2\"></span>2-month ECL, Exposure At Default (EAD) equals the carrying<span class=\"_ _2\"></span> amount of the financial asset, to which the relevant Probability </span></span>of Default (PD) an<span class=\"_ _2\"></span>d the Loss Given Default (LGD) are applied<span class=\"_ _e\"></span><span class=\"ls1d\">; <span class=\"_ _e\"></span></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">for life<span class=\"_ _2\"></span>time ECL, the calculation method consists in identifying changes in exposure for each year, especially the expected ti<span class=\"_ _e\"></span>ming </span></span>and amount of th<span class=\"_ _2\"></span>e contractual repayments, and then applying to each repayment the relevant PD and the LGD, and discounting<span class=\"_ _e\"></span> the figures ob<span class=\"_ _2\"></span>tained. ECL is then the sum of the discounted figures; and <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">pro<span class=\"_ _2\"></span>bability of default is the likelihood of default over a particular time horizon (in stage 1, this time horizon is 12 month<span class=\"_ _e\"></span>s after the </span></span>repor<span class=\"_ _2\"></span>ting period; in stage 2 this time horizon is the e<span class=\"_ _e\"></span>ntire lifetime of the financial asset). This informa<span class=\"_ _2\"></span>tion is based on external data from a<span class=\"_ _2\"></span> well-known rating agency. The PD depends on the time horizon and of the rating of the counterparty. <span class=\"_ _e\"></span> The Group uses externa<span class=\"_ _2\"></span>l ratings if they are available; <span class=\"_ _e\"></span>or an internal ra<span class=\"_ _2\"></span>ting for major counterparties with no external <span class=\"_ _e\"></span>rating.  Elia Group d<span class=\"_ _2\"></span>id not see any changes in payment behaviour, nor an increase in bad debtors as a consequence of the crisis in 202<span class=\"_ _e\"></span><span class=\"ls5b\">1 </span>(C<span class=\"ls0\">OVID-<span class=\"ls5b\">19</span>) nor in 2022 (energy crisis) and it does not ex<span class=\"_ _e\"></span>pect any major impact related to the pandemic to arise in the coming years.<span class=\"_ _e\"></span> </span>Subsequently, a loss <span class=\"_ _2\"></span>given default is calculated as the percentage of the amount of trade receivables that is not covered b<span class=\"_ _2\"></span>y <span class=\"_ _e\"></span>a ba<span class=\"_ _e\"></span>nk guarantee.<span class=\"_ _2\"></span> <span class=\"ff42\">The total outstanding amount of trade receivables covered by a bank guarantee totals \u20ac97.1 million. The loss given default<span class=\"_ _e\"></span></span> is multiplied b<span class=\"_ _2\"></span>y the outstanding trade receivables.<span class=\"_ _e\"></span> This approa<span class=\"_ _2\"></span>ch is deemed more relevant than the portfolio approach to provid<span class=\"_ _e\"></span>e a better assessment of the risk, especially in the current context o<span class=\"_ _2\"></span>f volatile market conditions. The impact of this new approach is not significant. Furthermore, any <span class=\"_ _e\"></span>losses would be recoverable through the<span class=\"_ _2\"></span> tariffs. <span class=\"_ _e\"></span> The model is applied to the<span class=\"_ _2\"></span> trade receivables, all other fin<span class=\"_ _e\"></span>ancial assets<span class=\"_ _2\"></span> being not assessed at risk of impairment co<span class=\"_ _e\"></span>nsidering<span class=\"_ _2\"></span> their nature (regu<span class=\"_ _2\"></span>latory assets, amounts recoverable through future tariffs in compliance with the regulatory frameworks), risk profile (reliable counterparty<span class=\"_ _2\"></span> being for the levies the Belgian/German stat<span class=\"_ _e\"></span>e) or measurement metho<span class=\"_ _2\"></span>d (at fair value). More details are provided in the different note<span class=\"_ _2\"></span>s.<span class=\"_ _e\"></span> LIQUIDITY RISK Liquidity r<span class=\"_ _2\"></span>isk is the risk that the group <span class=\"_ _e\"></span>may be unable to meet its financial obligations. The group limits this risk by constantly monitoring cash flows and en<span class=\"_ _2\"></span>suring that there are always sufficient credit<span class=\"_ _e\"></span>-line facilities available. The <span class=\"ff42\">group<span class=\"_ _2\"></span>\u2019s <span class=\"ff3f\">objective is to maintain a balance between continuity of<span class=\"_ _e\"></span> funding and flexibility through the use of bank loans, co<span class=\"_ _2\"></span>nfirmed and </span></span>unconfirmed credit facilities, commer<span class=\"_ _2\"></span>cial paper program<span class=\"ls57\">me</span>s, etc. For medium- to long-term funding, the group uses bonds. The maturity profile o<span class=\"_ _2\"></span>f the debt portfolio is spread over several ye<span class=\"_ _e\"></span>ars. The Group Treasury frequently assesses its funding resources taking in<span class=\"_ _2\"></span>to account its own credit ra<span class=\"_ _2\"></span>ting and general market conditions.<span class=\"_ _e\"></span> Bond issuance<span class=\"_ _2\"></span>s realised ove<span class=\"_ _e\"></span>r the last years and loan contracts signed with EIB and other banks prove that the group has access to different sour<span class=\"_ _2\"></span>ces of funding.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Expected Closing 6-<span class=\"ls5b\">12 </span>1-<span class=\"ls5b\">2 </span>2-<span class=\"ls5b\">5 </span>&gt; 5 Face value cash 6 months balance months years years years outflows Non-derivat<span class=\"_ _2\"></span>ive financial liabilities 11,546<span class=\"_ _2\"></span>.5 <span class=\"_ _e\"></span> 11,513<span class=\"_ _2\"></span>.3 <span class=\"_ _e\"></span> (12,352.6) (3,878.3) (25.6) (897.5) (2,128.6) (5,422.6) Unsecured bond issues 7,281.7  7,248.5  (8,124.1) (103.6) (23.6) (877.1) (1,820.6) (5,299.2) Unsecured finan<span class=\"_ _2\"></span>cial bank loans and interest accruals 568.4  568.4  (532.1) (78.4) (2.0) (20.4) (308.0) (123.4) Trade and<span class=\"_ _2\"></span> other payables<span class=\"_ _e\"></span> 3,696.4  3,696.4  (3,696.4) (3,696.4) 0.0  0.0  0.0  0.0  Total at<span class=\"_ _2\"></span> 31 December 2021<span class=\"ls0\"> </span>11,546<span class=\"_ _2\"></span>.5 <span class=\"_ _e\"></span> 11,513<span class=\"_ _2\"></span>.3 <span class=\"_ _e\"></span> (12,352.6) (3,878.3) (25.6) (897.5) (2,128.6) (5,422.6) (in \u20ac million)<span class=\"ff40\"> </span>Expected Closing 6-<span class=\"ls5b\">12 </span>1-<span class=\"ls5b\">2 </span>2-<span class=\"ls5b\">5 </span>&gt; 5 Face value cash 6 months balance months years years years outflows Non-derivat<span class=\"_ _2\"></span>ive financial liabilities 13,327<span class=\"_ _2\"></span>.1 <span class=\"_ _e\"></span> 13,296<span class=\"_ _2\"></span>.7 <span class=\"_ _e\"></span> (14,979.8) (4,925.7) (800.5) (659.5) (1,923.7) (6,670.4) Unsecured bond issues 7,273.3  7,243.0  (8,972.9) (103.5) (798.2) (639.3) (1,620.9) (5,811.0) Unsecured finan<span class=\"_ _2\"></span>cial bank loans and interest accruals 1,249.6  1,249.6  (1,202.7) (18.1) (2.3) (20.2) (302.8) (859.4) Trade and<span class=\"_ _2\"></span> other payables<span class=\"_ _e\"></span> 4,804.2  4,804.2  (4,804.2) (4,804.2) 0.0  0.0  0.0  0.0  Total at<span class=\"_ _2\"></span> 31 December 2022<span class=\"ls0\"> </span>13,327<span class=\"_ _2\"></span>.1 <span class=\"_ _e\"></span> 13,296<span class=\"_ _2\"></span>.7 <span class=\"_ _e\"></span> (14,979.8) (4,925.7) (800.5) (659.5) (1,923.7) (6,670.4) Details of th<span class=\"_ _2\"></span>e used and unused back-<span class=\"_ _e\"></span>up credit facilities are set out below: Availab<span class=\"_ _2\"></span>le Average basic<span class=\"_ _2\"></span> Amount Amount not<span class=\"_ _2\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Matu<span class=\"_ _2\"></span>rity<span class=\"_ _e\"></span> amount interest used used Sustainable Re<span class=\"_ _2\"></span>volving Credit Facility<span class=\"_ _e\"></span> 10/12/2025 650.0  Euribor + 0.325%  0.0  650.0  Confirmed cred<span class=\"_ _2\"></span>it line<span class=\"_ _e\"></span> 2/26/2025 750.0  Euribor + 0,275% 0.0  750.0  Confirmed cred<span class=\"_ _2\"></span>it line<span class=\"_ _e\"></span> 12/14/2026 150.0  Euribor + 0,275% 150.0  0.0  Straight L<span class=\"_ _2\"></span>oan EGI<span class=\"_ _e\"></span> unlimited 2.5  Euribor + 0.75<span class=\"_ _2\"></span>%<span class=\"_ _e\"></span> 0.0  2.5  Confirmed cred<span class=\"_ _2\"></span>it line<span class=\"_ _e\"></span> unlimited 35.0  Eurribor<span class=\"_ _2\"></span> + 0.2%<span class=\"_ _e\"></span> 0.0  35.0  av. 1M-<span class=\"_ _2\"></span>Euribor Confirmed cred<span class=\"_ _2\"></span>it line<span class=\"_ _e\"></span> unlimited 150.0  0.0  150.0  +0.275<span class=\"_ _2\"></span>%<span class=\"_ _e\"></span> Total 1,737.5  150.0  1,587.5  Since 2020, <span class=\"_ _2\"></span>the group has had several lines available to guarantee the financing of its activities and to cushion possible va<span class=\"_ _e\"></span>riations in levies (even if we can observe a<span class=\"_ _2\"></span> surplus for the last 2 years) or derivatives. Indeed, the hi<span class=\"_ _e\"></span>gh volume of futures contracts contracted by 50Hertz Tran<span class=\"_ _2\"></span>smission (Germany) also has an impact on t<span class=\"_ _e\"></span>he Group's liquidity management. The daily ca<span class=\"_ _2\"></span>sh settlem<span class=\"_ _e\"></span>ent of future<span class=\"_ _2\"></span>s contract<span class=\"_ _2\"></span>s with the exchange can have short<span class=\"_ _e\"></span>-term effects on liquidity, which largely follow the general price trend on the electricity market.<span class=\"_ _2\"></span>  <span class=\"_ _e\"></span> HEDGI<span class=\"_ _e\"></span>NG ACT<span class=\"_ _e\"></span>IVIT<span class=\"_ _e\"></span>IES AND<span class=\"_ _e\"></span> DER<span class=\"_ _e\"></span>IVATIVES<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> is exposed to certain risks relating to its ongoing business operations. The primary risk managed using derivative instrument<span class=\"_ _e\"></span>s is interest rate risk. All financial der<span class=\"_ _2\"></span>ivatives entered into by the Group relate to an underlying transaction or forecast exposure, depending on th<span class=\"_ _e\"></span>e expected impact on the statement of pro<span class=\"_ _2\"></span>fit or loss, and if the IFRS 9<span class=\"_ _e\"></span> criteria are met, the group decides on a case-<span class=\"ls5b\">by<span class=\"_ _e\"></span></span>-case basis whether hedge accounting will be applied. Deri<span class=\"_ _e\"></span>vatives not des<span class=\"_ _2\"></span>ignated as hedging instruments<span class=\"ff3f fs8\"> </span>The group<span class=\"_ _2\"></span> had no derivatives which were <span class=\"_ _e\"></span>not designated as hedging instruments. Deri<span class=\"_ _e\"></span>vatives designated as<span class=\"_ _2\"></span> hedging instruments In 2018, t<span class=\"ls5b\">he </span>group hedged the interest rate risk linked to the acquisition of a 20% stake in 50Hertz Transmission (Germany) for which a bridge loan was <span class=\"_ _2\"></span>initially put in place. To cover the potential exposure to interest rate risk, the <span class=\"_ _e\"></span>group entered into a pre-hedge interest rate swap agreement in J<span class=\"_ _2\"></span>une 2018 to lock in m<span class=\"_ _e\"></span>arket interest <span class=\"ff42\">rates at the moment of the issuance of the \u20ac300 million senior<span class=\"_ _2\"></span> bond. The </span>group<span class=\"_ _2\"></span> applied hedge accounting as the derivative transaction met the requirements under IFRS 9. U<span class=\"_ _e\"></span>pon the settlement of the transact<span class=\"_ _2\"></span>ion in September 2018, the portion of the gain or l<span class=\"_ _e\"></span>oss on the derivative was recognised within hedging reserves and had an impact of \u20ac5.7million.<span class=\"ff3f\"> </span>These hedg<span class=\"_ _2\"></span>ing reserves <span class=\"_ _e\"></span>are recycled into profit and loss over the lifetime<span class=\"_ _2\"></span> of the underlying hedged instrument, i.e. the senior bond with 10<span class=\"ls0\">-year maturity. In 2022<span class=\"ff42\">, an amount of \u20ac0.6 million was recycled into profit and loss.</span> </span>The group<span class=\"_ _2\"></span> recognises derivatives to hedge the price for th<span class=\"_ _e\"></span>e future procurement of the physical requirement for grid losses tha<span class=\"_ _2\"></span>t is expected<span class=\"_ _2\"></span> in subsequent periods and is covered in each case by short-term procurement transactions on the spot <span class=\"_ _e\"></span>market.<span class=\"_ _2\"></span> These derivatives are measured at fair<span class=\"_ _2\"></span> value in OCI with no effe<span class=\"_ _e\"></span>ct on profit or loss as part of cash f<span class=\"_ _2\"></span>low hedge accounting; <span class=\"_ _e\"></span>they serve as price hedging<span class=\"_ _2\"></span> of the physical demand for electrical energy to cover grid losses (underlying transaction). Due to the availability a<span class=\"_ _e\"></span>nd liquidity of future<span class=\"_ _2\"></span>s trading, the hedging period for intended price hedging covers a period of up to two years from the balance sheet date. In this context, the Group pursues a co<span class=\"_ _2\"></span>nservative hedging strategy oriented towards the regulatory framework and the ability to roll <span class=\"_ _e\"></span>over the electricity procur<span class=\"_ _2\"></span>ement costs incurred, which enables tim<span class=\"_ _e\"></span>ely and predictable pr<span class=\"_ _2\"></span>ice hedging.  <span class=\"_ _e\"></span> The cr<span class=\"_ _2\"></span>itical term match method measures effectiveness. If the valuation-<span class=\"_ _e\"></span>relevant parameters of the hedged item and hedging instrument match, it <span class=\"_ _2\"></span>is assumed that an effective hedging relationshi<span class=\"_ _e\"></span>p exists and that changes in value from bo<span class=\"_ _2\"></span>th items offset each other. The <span class=\"_ _e\"></span>group strives for<span class=\"_ _2\"></span> full price hedging of the expected volume of grid loss energy (hedge ratio 1:1). <span class=\"_ _20\"></span> In 2022, the<span class=\"_ _2\"></span> group also entered into Interest Rate Swaps <span class=\"_ _e\"></span>contracts as pre-hedge for probable forecast debt transactions. The purpose of those instruments was to fix the<span class=\"_ _2\"></span> rate at which the g<span class=\"_ _e\"></span>roup will borro<span class=\"_ _2\"></span>w in the context of future bond issues plan<span class=\"_ _e\"></span>ned in 2023. This was performed<span class=\"_ _2\"></span> through 5 forward contracts<span class=\"ls95\">. </span> CAPITAL RISK <span class=\"_ _e\"></span>MANAGEMENT The purpo<span class=\"_ _2\"></span>se of the group's capital-structure management<span class=\"_ _e\"></span> is to ensure that the debt and equity ratios related to its regulated activities are as <span class=\"_ _2\"></span>closely aligned as possible with t<span class=\"_ _e\"></span>he recommended level set by the relevant regulatory frameworks.   The Company's d<span class=\"_ _2\"></span>ividend guidelines involve optimising dividend payments while bearing in mind that self<span class=\"_ _e\"></span>-financing capacity is needed to carry out its leg<span class=\"_ _2\"></span>al mission as transmission system operato<span class=\"_ _e\"></span>r, finan<span class=\"_ _2\"></span>ce future CAPEX projects and,<span class=\"_ _e\"></span> more generally, implement the g<span class=\"ff42\">roup\u2019s </span>strateg<span class=\"_ _2\"></span>y. The Company offer<span class=\"_ _2\"></span>s its employees the opportunity to sub<span class=\"_ _e\"></span>scribe to capital increases <span class=\"_ _2\"></span>that are exclusively reserved fo<span class=\"_ _e\"></span>r them<span class=\"_ _2\"></span>.<span class=\"_ _e\"></span> SUSTAIN<span class=\"_ _e\"></span>ABI<span class=\"_ _2\"></span>LITY<span class=\"ff3f fs8\"> </span>Sustainability lies a<span class=\"_ _2\"></span>t the heart of Elia<span class=\"ff42 ls1c\">\u2019s</span> strategy through its<span class=\"_ _e\"></span> ActNow program<span class=\"ls57\">me<span class=\"_ _2\"></span><span class=\"ls0\">, which sets out the long-term sustainability objectives of </span></span>the group. These are<span class=\"_ _2\"></span> guided by the UN Sustainable Development Goals (SDGs) and have been translated into KPIs which are reported<span class=\"_ _e\"></span> to the marke<span class=\"_ _2\"></span>t and grouped under the following five dime<span class=\"_ _e\"></span>nsions: Climate Action; Environment and Circular Economy; Health and Safety; Diversity, Equity a<span class=\"_ _2\"></span>nd Inclusion; and Governance, Ethics and Compliance. <span class=\"_ _e\"></span> Furtherm<span class=\"_ _2\"></span>ore, as a driver of the energy transition, Elia Group is committed to ensuring that its activities are strongly align<span class=\"_ _e\"></span>ed with the EU Taxonomy, a c<span class=\"_ _2\"></span>lassification system for sustainable economic activities. Elia Group therefore published in 2021 a whit<span class=\"_ _e\"></span>e paper which outlines the company\u2019s e<span class=\"_ _2\"></span>ligibility and alignment with the EU Taxonomy. The paper includes the methodology u<span class=\"_ _2\"></span>sed for <span class=\"_ _e\"></span><span class=\"ff3f\">the <span class=\"_ _e\"></span>assessment, </span>highlights t<span class=\"_ _2\"></span>he g<span class=\"ff42\">roup\u2019s implementation of sustainable tools and practices, and reinforces its commitment to oper<span class=\"_ _e\"></span></span>ating its businesses in a sustainable<span class=\"_ _2\"></span> way. In 2022, the group also se<span class=\"_ _e\"></span>t up an annual meeting which will address the embedding of su<span class=\"_ _2\"></span>stainability into decision<span class=\"_ _e\"></span>-making processe<span class=\"_ _2\"></span>s such as budget planning, strategic planning, and operational processes. Both ETB an<span class=\"_ _e\"></span>d 50Hertz appointed compliance<span class=\"_ _2\"></span> coordinators.<span class=\"_ _e\"></span> We refer<span class=\"_ _2\"></span> to our Integrated Report <span class=\"ls5b\">and <span class=\"_ _e\"></span></span>our Sustainability R<span class=\"_ _e\"></span>eport for further informa<span class=\"_ _2\"></span>tion.<span class=\"_ _e\"></span> 8.2. <span class=\"_ _87\"> </span>Commitments and contingencies CAPITAL-EXPENDITURE COMMITMENT As at 31 December<span class=\"_ _2\"></span> 2022, the group ha<span class=\"_ _e\"></span>d a commitment of <span class=\"ff42\">\u20ac</span>3,<span class=\"ls5b\">883</span>.9 million (<span class=\"ff42\">\u20ac</span>2,068.4 million in 2021) relating to purchase contracts for the installa<span class=\"_ _2\"></span>tion of property, plant and equipment for further grid extensions.<span class=\"_ _e\"></span>  OTHER C<span class=\"_ _e\"></span>ON<span class=\"_ _2\"></span>TINGENCIES AND COMMITMENTS As at 31 December<span class=\"_ _2\"></span> 2022, the group <span class=\"ls5b\">ha<span class=\"_ _e\"></span></span>d a commitment of <span class=\"ff42\">\u20ac</span><span class=\"ls5b\">347</span>.9 million (<span class=\"ff42\">\u20ac</span>263.5 million in 2021) r<span class=\"_ _e\"></span>elating to purchase contracts for general expenses, maintenance and repa<span class=\"_ _2\"></span>ir costs.<span class=\"_ _e\"></span> Having rece<span class=\"_ _2\"></span>ived approval from the Walloon government a<span class=\"_ _e\"></span>nd from the<span class=\"_ _2\"></span> CREG, on 22 June 2015 E<span class=\"_ _e\"></span>lia entered into an agreement with Solar Chest f<span class=\"_ _2\"></span>or the sale of Walloon green certificates with a total value of \u20ac275 million. Solar Chest's mission is to buy, h<span class=\"ff3f\">old a<span class=\"_ _e\"></span>nd sell </span>Walloon gr<span class=\"_ _2\"></span>een certificates for periods of five, six and seven years. In accordance<span class=\"_ _e\"></span> with legislation, Solar Chest conducted several auctions.  Since June 2015, <span class=\"_ _2\"></span>Elia has been obliged to buy back from S<span class=\"_ _e\"></span>olar Chest t<span class=\"_ _2\"></span>he green certificates that the latter could not sell on <span class=\"_ _e\"></span>the mark<span class=\"_ _e\"></span>et in due time. At the<span class=\"_ _2\"></span> auction it organized in February 2022, So<span class=\"_ _e\"></span>lar Chest sold all the green certificates it st<span class=\"_ _2\"></span>ill held at that time to the market. In September 2022, Solar<span class=\"_ _2\"></span> Chest's activities were terminated and it was dissolved. The aforementioned obligation to buy back the certificates <span class=\"_ _2\"></span>from Elia has therefore not been ap<span class=\"_ _e\"></span>plied in any concrete case and is no longer applicable. In September 2017<span class=\"_ _2\"></span>, Elia sold 2.8 million green certificates to the Walloon Region (i.e. the Walloon Agency for Air and Climat<span class=\"_ _e\"></span>e, or AwA<span class=\"_ _e\"></span>C) leading t<span class=\"_ _2\"></span>o a net cash inflow of \u20ac181.2 million. This <span class=\"ff3f\">was a r<span class=\"_ _e\"></span>esult of the Decree of 29 June 2017 amending the Decree of 12 April 2011 </span>relating to the<span class=\"_ _2\"></span> organisation of the regional electricity market and the Decree of 5 March 2008 relating to the creation of th<span class=\"_ _e\"></span>e Walloon Agency for Air<span class=\"_ _2\"></span> and Climate. The green certificates transfe<span class=\"_ _e\"></span>rred b<span class=\"_ _2\"></span>y El<span class=\"_ _e\"></span>ia can be gradually resold b<span class=\"_ _2\"></span>y the AwAC from 2022 onwards, taking into account the mar<span class=\"_ _2\"></span>ket conditions that exist for green certificates at that time. The legislation also envisages the green c<span class=\"_ _e\"></span>ertificates being held by the AwAC for a period of up to n<span class=\"_ _2\"></span>ine years, after w<span class=\"_ _e\"></span>hich Elia is requ<span class=\"_ _2\"></span>ired to buy back any unsold certificates. These repurchase commitments will have<span class=\"_ _2\"></span> no impact on Elia's financial performance, as the cost and expense for the repurchase will be fully recov<span class=\"_ _e\"></span>ered through the<span class=\"_ _2\"></span> tariffs for levies. The legislation was supplemented in 2021 by new provisions that allow the Government to decide, after consultation with th<span class=\"_ _2\"></span>e LTSO, on the gradual resale to Elia of certain quantities of green certificates held by AwAC.<span class=\"_ _e\"></span> In November 2018, <span class=\"ff42\">Elia so<span class=\"_ _2\"></span>ld another \u20ac0.7 million in green certificates to the Walloon Region (i.e. the AwAC) which resulted in a net </span>cash inflow of \u20ac43.3 million. <span class=\"_ _2\"></span>As with the transaction in September 2017, Elia might be required to buy back some of the certi<span class=\"_ _e\"></span><span class=\"ff3f\">ficates sold </span>fr<span class=\"ls0\">om 2023 onwards. Any repurchase will be co<span class=\"_ _2\"></span>vered throu<span class=\"_ _e\"></span>gh the tariffs for levie<span class=\"_ _2\"></span>s. There were no transactions for sale of green </span>certificates <span class=\"_ _2\"></span>to the AwAC in 2019, 2020, 2021 or 2022. C<span class=\"_ _e\"></span>onsidering (i) the state of the Walloon green certificate market and (ii) th<span class=\"ls78\">e </span>amoun<span class=\"_ _2\"></span>ts actually available following the application of the surcharge in 2022, the Walloon Government has decided to ask Elia<span class=\"_ _e\"></span> to buy back certif<span class=\"_ _2\"></span>icates held by AwAC for an amount of \u20ac45.5 million.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>In Germany, offshore expenses between 50Hertz and TenneT<span class=\"_ _2\"></span> <span class=\"_ _e\"></span>TSO arising from the horizontal sett<span class=\"_ _2\"></span>lement <span class=\"_ _e\"></span>has given rise to financial obligation<span class=\"_ _2\"></span>s for 50Hertz in future periods. The total amount<span class=\"_ _e\"></span> of these future <span class=\"ff42\">cumulative amounts comes to \u20ac</span>0.3 million<span class=\"_ _e\"></span> (prior yea<span class=\"ff42\">r: \u20ac</span>3.9 million<span class=\"ff42\">) and will be r<span class=\"_ _2\"></span>eflected in 50Hertz\u2019s networ<span class=\"ff3f\">k use<span class=\"_ _e\"></span>r charge calculations over the coming years following the corresponding billing b<span class=\"_ _2\"></span>y </span></span>TenneT T<span class=\"_ _2\"></span>SO.  8.3. <span class=\"_ _87\"> </span>Related parties CONTROLLING ENTITIES The <span class=\"_ _20\"></span>core <span class=\"_ _5d\"></span>shareholder <span class=\"_ _20\"></span>of <span class=\"_ _5d\"></span>Elia <span class=\"_ _5d\"></span>Group <span class=\"_ _20\"></span>is <span class=\"_ _5d\"></span>Publi-T <span class=\"_ _5d\"></span>and <span class=\"_ _5d\"></span>this <span class=\"_ _5d\"></span>rem<span class=\"_ _2\"></span>ained <span class=\"_ _5d\"></span>unchanged <span class=\"_ _20\"></span>from <span class=\"_ _5d\"></span>2021. <span class=\"_ _5d\"></span>Other <span class=\"_ _20\"></span>th<span class=\"_ _e\"></span>an <span class=\"_ _20\"></span>the <span class=\"_ _5d\"></span>yearly <span class=\"_ _5d\"></span>dividend <span class=\"_ _20\"></span>payment, <span class=\"_ _5d\"></span>no<span class=\"_ _e\"></span> transact<span class=\"_ _2\"></span>ions occurred with the core shareholder in 2022.<span class=\"_ _e\"></span> The shareholder<span class=\"_ _2\"></span> structure of the group can be fo<span class=\"_ _e\"></span>und in Note 7. TRANSACTIONS WITH KEY MANAGEM<span class=\"_ _2\"></span>ENT PER<span class=\"_ _e\"></span>SONNEL Key <span class=\"_ _24d\"> </span>management <span class=\"_ _24d\"> </span>personnel <span class=\"_ _24d\"> </span>include <span class=\"_ _24d\"> </span>E<span class=\"_ _e\"></span>lia's <span class=\"_ _24d\"> </span>Board <span class=\"_ _57\"> </span>of <span class=\"_ _24d\"> </span>Directors <span class=\"_ _24d\"> </span>and <span class=\"_ _24d\"> </span>Elia\u2019s <span class=\"_ _57\"> </span>Management <span class=\"_ _24d\"> </span>Committee, <span class=\"_ _57\"> </span>both <span class=\"_ _24d\"> </span>of <span class=\"_ _24d\"> </span>whi<span class=\"_ _e\"></span>ch <span class=\"_ _24d\"> </span>have <span class=\"_ _24d\"> </span>a <span class=\"_ _24d\"> </span>significa<span class=\"_ _e\"></span>nt influence a<span class=\"_ _2\"></span>cross the entire Elia Group. <span class=\"_ _e\"></span> At <span class=\"_ _20\"></span>50Hertz <span class=\"_ _20\"></span>Tr<span class=\"_ _e\"></span>ansmission <span class=\"_ _20\"></span>(Germany), <span class=\"_ _5d\"></span>key <span class=\"_ _20\"></span>management <span class=\"_ _5d\"></span>personnel <span class=\"_ _20\"></span>include <span class=\"_ _20\"></span>Eur<span class=\"_ _e\"></span>ogrid <span class=\"_ _20\"></span>Internationa<span class=\"_ _e\"></span><span class=\"ls1c\">l <span class=\"_ _20\"></span></span>S<span class=\"_ _e\"></span>A/NV<span class=\"ff42\">\u2019s <span class=\"_ _5d\"> </span>Board <span class=\"_ _5d\"> </span>of <span class=\"_ _20\"></span>Directors, <span class=\"_ _20\"></span>who <span class=\"_ _5d\"></span>are </span>respon<span class=\"_ _2\"></span>sible <span class=\"_ _24d\"> </span>for <span class=\"_ _5d\"> </span>monitoring <span class=\"_ _24d\"> </span>the <span class=\"_ _24d\"> </span>activities <span class=\"_ _5d\"></span>of <span class=\"_ _24d\"> </span>50Hertz <span class=\"_ _5d\"> </span>T<span class=\"_ _e\"></span>ransmission <span class=\"_ _5d\"></span>(Germany). <span class=\"_ _5d\"></span>Key <span class=\"_ _57\"> </span>management <span class=\"_ _5d\"></span>personnel <span class=\"_ _5d\"> </span>also<span class=\"_ _e\"></span> <span class=\"_ _5d\"> </span>include <span class=\"_ _5d\"> </span>th<span class=\"_ _e\"></span>e <span class=\"_ _5d\"></span>Boar<span class=\"_ _e\"></span>d <span class=\"_ _57\"> </span>of<span class=\"_ _e\"></span> Managemen<span class=\"_ _2\"></span>t of 50Hertz Transmission and the Superviso<span class=\"_ _e\"></span>ry Board, <span class=\"_ _2\"></span>which was established in the <span class=\"_ _e\"></span>German segment. <span class=\"_ _e\"></span> The <span class=\"_ _4b\"></span>me<span class=\"_ _e\"></span>mbers of <span class=\"_ _4b\"></span>Elia\u2019s Board <span class=\"_ _4b\"></span>of Dire<span class=\"ff3f\">ctors a<span class=\"_ _2\"></span>re not <span class=\"_ _4b\"></span>e<span class=\"_ _e\"></span>mployees o<span class=\"_ _2\"></span>f <span class=\"_ _2\"></span>the <span class=\"_ _2\"></span>group. The<span class=\"_ _2\"></span> remunera<span class=\"_ _2\"></span>tion for<span class=\"_ _2\"></span> their <span class=\"_ _4b\"></span>ma<span class=\"_ _e\"></span>ndate <span class=\"_ _4b\"></span>i<span class=\"_ _e\"></span>s detailed <span class=\"_ _2\"></span>in <span class=\"_ _2\"></span>the <span class=\"_ _2\"></span>Corporate </span>Governance <span class=\"_ _20\"></span>Statement, <span class=\"_ _20\"></span>w<span class=\"_ _e\"></span>hich <span class=\"_ _20\"></span>f<span class=\"_ _e\"></span>orms <span class=\"_ _20\"></span>part <span class=\"_ _5d\"></span>of <span class=\"_ _20\"></span>this<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>Annual <span class=\"_ _5d\"></span>Report <span class=\"_ _5d\"></span>(see <span class=\"_ _5d\"></span>the <span class=\"_ _20\"></span>remuneration <span class=\"_ _20\"></span>re<span class=\"_ _e\"></span>port).The <span class=\"_ _5d\"></span>members <span class=\"_ _20\"></span>of <span class=\"_ _5d\"></span>Eurogrid <span class=\"_ _20\"></span>Internationa<span class=\"_ _e\"></span>l SA/NV<span class=\"ff42\">\u2019s Board of Director<span class=\"_ _2\"></span>s are not remunerated.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>The o<span class=\"_ _2\"></span>ther members of key management personnel are hired as employees. The components of their remuneration are detailed below<span class=\"_ _e\"></span> (i.e. exclud<span class=\"_ _2\"></span>ing the directors who are not employees)<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> The names of the<span class=\"_ _2\"></span> key management staff are included in the Corporate Governance report.<span class=\"_ _e\"></span> Key management per<span class=\"_ _2\"></span>sonnel did not receive stock options, special loans or other advances from the group throughout the year.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Short-te<span class=\"_ _2\"></span>rm employee benefits<span class=\"_ _e\"></span> 4.0 2.5 Basic remuneration 2.6 1.7 Variable r<span class=\"_ _2\"></span>emuneration<span class=\"_ _e\"></span> 1.4 0.8 Long-term employe<span class=\"_ _2\"></span>e benefits<span class=\"_ _e\"></span> 0.6 0.5 Post-emp<span class=\"_ _2\"></span>loyment benefits<span class=\"_ _e\"></span> 0.6 0.4 Other va<span class=\"_ _2\"></span>riable remuneration<span class=\"_ _e\"></span> 0.3 0.2 Total gross remune<span class=\"_ _2\"></span>ration 5.5 3.5 Number<span class=\"_ _2\"></span> of persons (in units)<span class=\"_ _e\"></span> 7 5 Average gross remunera<span class=\"_ _2\"></span>tion per person<span class=\"_ _e\"></span> 0.7 0.7 Number of shares<span class=\"_ _2\"></span> (in units) held as at 31 December 2022<span class=\"_ _e\"></span> 8,548  7,849  TRANSACTIONS WITH JOINT VENTURES AND A<span class=\"_ _2\"></span>SSOCIATES<span class=\"_ _e\"></span> Transa<span class=\"_ _2\"></span>ctions between the Company and subsidiaries that are related parties were eliminated during consolidation and therefore<span class=\"_ _e\"></span> are not recogn<span class=\"_ _2\"></span>ised in this note.  Transa<span class=\"_ _2\"></span>ctions with joint ventures and associates <span class=\"_ _e\"></span>(as defined in Note 7.1.) were not eliminated, so details of these transactions are shown below: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Transactions with joint vent<span class=\"_ _2\"></span>ures and associates (4.0) (4.5) Sales of goods 1.6  0.1  Purchases o<span class=\"_ _2\"></span>f goods<span class=\"_ _e\"></span> (5.6) (4.6) Outstanding ba<span class=\"_ _2\"></span>lances with joint ventures and associates<span class=\"_ _e\"></span> (0.4) (0.9) Trade deb<span class=\"_ _2\"></span>tors<span class=\"_ _e\"></span> (0.4) (0.7) Trade deb<span class=\"_ _2\"></span>ts 0.0  (0.2) In 2021 and<span class=\"_ _2\"></span> 2022, entities of the Elia Group had tra<span class=\"_ _e\"></span>nsactions with Nemo Link Ltd. and Coreso SA/NV. The sale of goods relates to corporate services (<span class=\"_ _2\"></span>SLAs) rendered by Elia to Ne<span class=\"_ _e\"></span>mo Link Ltd an<span class=\"_ _2\"></span>d Coreso SA/NV<span class=\"_ _e\"></span>. Nemo L<span class=\"_ _2\"></span>ink Ltd. also rents a building (Herdersbrug) from Elia Asset SA/NV (see<span class=\"_ _2\"></span> also Note 6.18). Purchases o<span class=\"_ _e\"></span>f goods mostly relates to service<span class=\"_ _2\"></span>s ren<span class=\"_ _e\"></span>dered by Coreso SA/NV to the group. TRANSACTIONS WITH SHAREHOLDERS  There were<span class=\"_ _2\"></span> no transactions with shareholders in 2022, except for the dividend payment. <span class=\"_ _e\"></span><span class=\"ff40 fs11\"> </span>TRANSACTIONS WITH RELATED PARTIES  Elia's <span class=\"_ _5d\"></span>Manage<span class=\"_ _2\"></span>ment <span class=\"_ _5d\"></span>Committee <span class=\"_ _5d\"></span>also <span class=\"_ _5d\"></span>assessed <span class=\"_ _20\"></span>w<span class=\"_ _e\"></span>hether <span class=\"_ _5d\"></span>transactions <span class=\"_ _5d\"></span>occurred <span class=\"_ _5d\"></span>with <span class=\"_ _5d\"></span>entities <span class=\"_ _20\"></span>i<span class=\"_ _e\"></span>n <span class=\"_ _5d\"></span>which <span class=\"_ _5d\"></span>they <span class=\"_ _5d\"></span>or <span class=\"_ _20\"></span>m<span class=\"_ _e\"></span>embers <span class=\"_ _5d\"></span>of <span class=\"_ _5d\"></span>the <span class=\"_ _20\"></span>Bo<span class=\"_ _e\"></span>ard <span class=\"_ _5d\"></span>o<span class=\"_ _20\"></span><span class=\"ls95\">f </span>Directors e<span class=\"_ _2\"></span>xercise a significant influence (e.g. positions as CEO, CFO, vice-chair of the Manageme<span class=\"_ _e\"></span>nt Committee, etc.). <span class=\"_ _e\"></span> There were<span class=\"_ _2\"></span> some significant transactions in 2022 i<span class=\"_ _e\"></span>n which the key management personnel of the group has a significant influence. All these tra<span class=\"ff42\">nsact<span class=\"_ _2\"></span>ions took place in the normal course of Elia\u2019s business activities.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>The total value of realised sales was \u20ac0.5 m<span class=\"_ _2\"></span>illion and </span>related<span class=\"_ _2\"></span> to regulated sales contracts with prices that had been predefined by the regulator. The total value of expenses amoun<span class=\"_ _e\"></span>ted to \u20ac0.3<span class=\"ff3f\"> m<span class=\"_ _2\"></span>illion. As at 31 December 2022, there were no outs<span class=\"_ _e\"></span>tanding trade-receivable positions nor outstanding trade-d<span class=\"_ _e\"></span>ebt positions with </span>related<span class=\"_ _2\"></span> parties.<span class=\"_ _e\"></span> 8.4. <span class=\"_ _87\"> </span>Subsequent events No significant <span class=\"_ _2\"></span>events that would result in the financial statements being adjusted <span class=\"_ _e\"></span>occurred after the closing of the financial statements as of 31 December 2022. Elia Group SA/NV (\u201cElia Gr<span class=\"_ _2\"></span>oup\u201d) has successfully placed \u20ac500 million hybrid securities to be admitted to trading on<span class=\"_ _e\"></span><span class=\"ff3f\"> the Luxembourg </span>Stock Exchange's Euro<span class=\"_ _2\"></span> MTF market and to be listed on the Official List of the Luxembourg Stock Exchange.<span class=\"_ _e\"></span> 8.5. <span class=\"_ _87\"> </span>Miscellaneous  Impact of the<span class=\"_ _2\"></span> United Kingdom leaving the European Unio<span class=\"_ _e\"></span>n On 30 December 2020, the Euro<span class=\"_ _2\"></span>pean Union and the UK signed a Trade and Cooperation Agreement that <span class=\"_ _e\"></span>outlines the terms of future cooperation between both<span class=\"_ _2\"></span> parties after 1 January 2021 (t<span class=\"_ _e\"></span>he official date on which the UK left the EU)<span class=\"ls1d\">. </span>According to this agreement, the UK left <span class=\"ls1d\">th</span>e Internal Energy Market (IEM)<span class=\"_ _2\"></span>.<span class=\"_ _e\"></span> Two year<span class=\"_ _2\"></span>s after Brexit, no impacts on the business of Ne<span class=\"_ _e\"></span>mo Link Ltd. h<span class=\"_ _2\"></span>ad been felt;<span class=\"_ _e\"></span> Nemo Link remained in operation as before<span class=\"ls1d\">. </span>The profitab<span class=\"_ _2\"></span>ility of the investment was also largely unaffected <span class=\"_ _e\"></span>due to the cap and floor mechanism (see Note 9.3), which provides certainty regarding t<span class=\"_ _2\"></span>he company\u2019s cash flows over a 25<span class=\"ff3f\">-ye<span class=\"_ _e\"></span>ar time period. There are no import duties on the transport of electricity. </span>Other than t<span class=\"_ _2\"></span>he risk identified above, Brexit <span class=\"ls5b\">ha<span class=\"_ _e\"></span></span>d a very limited effect on the consolidated financial statements. The impact of the war in Ukr<span class=\"_ _2\"></span>aine<span class=\"_ _e\"></span> Given the nature and location of <span class=\"_ _2\"></span>its operations and the fact that Elia Group does not currently have activities in Russia nor in Uk<span class=\"_ _e\"></span>raine or with Russian companie<span class=\"_ _2\"></span>s, Elia Group does not observe a direct impact of the Ukrainian conflict on its business. However, there <span class=\"_ _e\"></span>is a strong push a<span class=\"_ _2\"></span>t the European level to become less dependent from Russian gas and fossil fuels. Accordingly, the Group observes <span class=\"_ _e\"></span><span class=\"ls5b\">a </span>willingness among the au<span class=\"_ _2\"></span>thorities in Belgium and Germany to accelerate the energy transition and the related investment plans<span class=\"_ _e\"></span><span class=\"ls1d\">. <span class=\"_ _e\"></span></span> 8.6. <span class=\"_ _87\"> </span>Services provided by the auditors The Genera<span class=\"_ _2\"></span>l Meeting of Shareholders appointed as joint auditors BDO Bedrijfsrevisoren BV<span class=\"_ _e\"></span> (represented by Mr. Felix Fank) and E<span class=\"ls27\">Y </span>Bedrijfsrevisoren BV (represented by Mr. Paul Eelen) for the aud<span class=\"_ _2\"></span>it of the consolidated financial statements of Elia G<span class=\"_ _e\"></span>roup SA/NV and Elia Transmission Belgiu<span class=\"_ _2\"></span>m SA/NV<span class=\"_ _e\"></span> and the audit of the statutory financial statements of Elia Group SA/NV<span class=\"ls1d\">, </span>Elia Transmission Belgium SA/NV, Elia Asset SA<span class=\"_ _e\"></span>/NV, Elia Enginee<span class=\"_ _2\"></span>ring SA/NV, Elia Grid International SA/NV, Eurogrid International SA/NV, Windgrid SA/NV and Re.Alto BV/SRL. BDO Bedrijfsrevisore<span class=\"_ _2\"></span>n BV<span class=\"_ _e\"></span> and EY Bedrijfsrevisoren BV are also the statutory auditors of Core<span class=\"_ _2\"></span>so SA/NV<span class=\"_ _e\"></span>. 50Hertz Tran<span class=\"_ _2\"></span>smission (Germany) appointed BDO AG Wir<span class=\"_ _e\"></span>tschaftspr\u00fcfung<span class=\"_ _2\"></span>sgesellschaft<span class=\"_ _e\"></span> for the audit of the consolidated financial statements of <span class=\"_ _2\"></span>Eurogrid GmbH and the statutory financial statements of Eurogrid GmbH, <span class=\"_ _e\"></span>50Hertz Transmission GmbH, 50Hertz Offshore GmbH and Elia Grid I<span class=\"_ _2\"></span>nternational GmbH.<span class=\"_ _e\"></span> The fo<span class=\"_ _2\"></span>llowing table sets out the fees of the joint auditors and their associate<span class=\"_ _e\"></span>s in connection with services delivered with respect to the financial year 2022: in \u20ac<span class=\"ff40\"> </span>Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany Total Statutory audit and r<span class=\"_ _2\"></span>eview of consolidated and parent company financial statements<span class=\"_ _e\"></span> 397,721  359,360  757,081  Non-aud<span class=\"_ _2\"></span>it services, of which: 559,784  101,185  660,969  Services rela<span class=\"_ _2\"></span>ted to legal and regulatory requirements<span class=\"_ _e\"></span> 134,075  40,840<span class=\"_ _2\"></span>  174,915  Other audit services 356,550  60,345<span class=\"_ _2\"></span>  416,895  Tax ser<span class=\"_ _2\"></span>vices 69,159  69,159<span class=\"_ _2\"></span>  Total 957,505  460,545  1,418,050  9.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>REGULATORY FRAMEWORK AND TARIFFS</span>9.1. <span class=\"_ _87\"> </span>Regulatory framework in Belgium9.1.1. <span class=\"_ _5b\"></span>Fe<span class=\"_ _e\"></span>deral legislation  The Electr<span class=\"_ _2\"></span>icity Act, which forms the general basis, lays down the core principles of the <span class=\"ff42\">regulatory framework governing Elia\u2019s activities </span>as a transmission<span class=\"_ _2\"></span> system operator in Belgium.<span class=\"_ _e\"></span> This Act was heavily amended<span class=\"_ _2\"></span> on 8 January 2012 by the transposition at federal level of the t<span class=\"_ _e\"></span>hird package of European directives. These changes ensure that the Electricity Act: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">sets ou<span class=\"_ _2\"></span>t the unbundling of transmission operations from generation, distribution and supply activities;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">sets ou<span class=\"_ _2\"></span>t in greater detail the rules for operating and accessing the transmission system;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">red<span class=\"_ _2\"></span>efines the transmission system operator's legal missio<span class=\"_ _e\"></span>n, mainly by expanding it to the offshore area<span class=\"_ _2\"></span>s over which<span class=\"_ _e\"></span> Belgium has </span></span>jurisdiction; <span class=\"_ _2\"></span>and<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">stren<span class=\"_ _2\"></span>gthens the role of the regulatory authority, particularly <span class=\"_ _e\"></span>with regards to the determination of the transmission tariffs. </span></span>A number of royal de<span class=\"_ _2\"></span>crees provide more details relating t<span class=\"_ _e\"></span>o the regulatory framework that applies to the transmission system operator, particularly the Ro<span class=\"_ _2\"></span>yal Decree on the Federal Grid Code. Similarl<span class=\"_ _e\"></span>y, the decisions passed by the CREG supplement these provisions to form the regulatory framework within which<span class=\"_ _2\"></span> Elia operates at federal level.<span class=\"_ _e\"></span> 9.1.2. <span class=\"_ _5b\"></span>Regiona<span class=\"_ _e\"></span>l legislation  Belgium's thre<span class=\"_ _2\"></span>e regions are primarily responsible for the local transmission of electricity through grids with a voltage of 70 kV or less across their re<span class=\"_ _2\"></span>spective territories<span class=\"ls1d\">. </span>Whilst t<span class=\"_ _e\"></span>he regional regulators are in charge of all non-tariff aspects of local transmission-system regulation, the setting and monitoring of tariffs falls under feder<span class=\"_ _2\"></span>al jurisdiction. The F<span class=\"_ _2\"></span>lemish Region, the Brussels<span class=\"_ _e\"></span>-Capital Region and the Walloon Region have also transposed into their legislative frameworks t<span class=\"_ _e\"></span>he provisions of the<span class=\"_ _2\"></span> third European package t<span class=\"_ _e\"></span>hat applies to them. The regional decrees have been supplemented by v<span class=\"_ _e\"></span>arious other rules and regulations relating to matters such as public service obligatio<span class=\"_ _2\"></span>ns, renewable energy and authorisation procedures for suppliers.9.1.3. <span class=\"_ _5b\"></span>Regu<span class=\"_ _e\"></span>latory agencies  As required by EU law, the Belgian<span class=\"_ _2\"></span> electricity market is monitored and controlled by independent regulator<span class=\"_ _e\"></span>s.<span class=\"_ _e\"></span> FEDER<span class=\"_ _e\"></span>A<span class=\"_ _2\"></span>L REGULATOR CREG is the federal r<span class=\"_ _2\"></span>egulator, and its powers with regard to Elia include:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">appr<span class=\"_ _2\"></span>oving the standardised terms in the three main contracts used by the company at federal level: the connection contra<span class=\"_ _2\"></span>ct, t<span class=\"_ _e\"></span><span class=\"ls5b\">he </span></span></span>access contract a<span class=\"_ _2\"></span>nd the ARP<span class=\"_ _e\"></span> contract; \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">appr<span class=\"_ _2\"></span>oving the capacity allocation system at the borders between Belgium an<span class=\"_ _2\"></span>d neighbouring countries;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">appr<span class=\"_ _2\"></span>oving the appointment of the independent members of the Board of Directors;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">dete<span class=\"_ _2\"></span>rmining the tariff methodology to be observed by the <span class=\"_ _e\"></span>system <span class=\"ls5b\">op</span>erator when calculating the various tariffs which<span class=\"_ _e\"></span> apply to grid </span></span>users; \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">certifyin<span class=\"_ _2\"></span>g that the system operator actually owns the infrastructure it operates and that it meets the regula<span class=\"_ _2\"></span>tory requirements for </span></span>independence<span class=\"_ _2\"></span> from generators and suppliers.<span class=\"_ _e\"></span> REGION<span class=\"_ _e\"></span>AL REGULA<span class=\"_ _2\"></span>TORS The opera<span class=\"_ _2\"></span>tion of electricity networks wit<span class=\"_ _e\"></span>h voltages of 70 kV <span class=\"ls5b\">or</span> less falls under the jurisdiction of the regional regulators. Each of these may require any opera<span class=\"_ _2\"></span>tor (including Elia if it operates such networks) to abide by any specific provision of the regional electricity rules on pain of administra<span class=\"_ _2\"></span>tive fines or other sanctions. However, the regional regulators do not have the power to set t<span class=\"_ _e\"></span>ariffs for electricity transmission system<span class=\"_ _2\"></span>s, as tariff setting falls u<span class=\"_ _e\"></span>nder the exclusive rem<span class=\"_ _2\"></span>it of the CRE<span class=\"_ _e\"></span>G for these networks9.1.4. <span class=\"_ _5b\"></span>Ta<span class=\"_ _e\"></span>riff setting  A <span class=\"ls0\">new ta<span class=\"_ _2\"></span>riff methodology came into force in early 2020. T<span class=\"_ _e\"></span>his methodolog<span class=\"_ _2\"></span>y is again applicable for a pe<span class=\"_ _e\"></span>riod of four years (2020-2023).<span class=\"_ _e\"></span> </span>TARIFF REGULATIONS On 28 June 2018, the CREG issued a decision which set the tar<span class=\"_ _2\"></span>iff methodology for the electricity transmission syst<span class=\"_ _e\"></span>em (including the offshore system) and the electricity networks which have transmission functions during the regulatory period 2020-2<span class=\"_ _e\"></span>023 (Decision (Z)1109/10). This m<span class=\"_ _2\"></span>ethodology is the general framework i<span class=\"_ _e\"></span>n accordance with which transmission tariffs are set for these four year<span class=\"_ _2\"></span>s. <span class=\"_ _20\"></span> Elia has pre<span class=\"_ _2\"></span>pared its tariff proposal for the regulato<span class=\"_ _e\"></span>ry period com<span class=\"_ _2\"></span>mencing on 1 January 2020 based on the methodology described below. Th<span class=\"_ _2\"></span>is proposal was approved by the CREG on 7 N<span class=\"_ _e\"></span>ovember 2019 (Decision (B)658E/62). TARIFF REGULATIONS APPLYING IN BELGIUM As the operator of networks wh<span class=\"_ _2\"></span>ich have transmission func<span class=\"_ _e\"></span>tions (covering the transmission system and the local and regional transmission networks in Belgium), Elia generates most of its income from the regulated tariffs charged for use o<span class=\"_ _2\"></span>f t<span class=\"_ _e\"></span>hese networks (tariff income)<span class=\"_ _2\"></span>, which are approved in advance by the CREG. Si<span class=\"_ _e\"></span>nce 1 January 2008, the prevailing tariff regulation mechanisms have provided for approved tar<span class=\"_ _2\"></span>iffs that were set for four-yea<span class=\"_ _e\"></span>r periods, barring specific circumstances. The tariff mechan<span class=\"_ _2\"></span>ism is based on amounts recognised in accordance with Belgia<span class=\"_ _e\"></span>n accounting regulations (BE GAAP). The<span class=\"_ _2\"></span> tariffs are based on budgeted costs m<span class=\"_ _2\"></span>inus a number of sources of non-tariff income. These costs are then divided based on an estimate of the volumes o<span class=\"_ _2\"></span>f electricity taken off the grid and, in the case of some costs, based on estimated volumes of electricity injected into the grid, in accordance with the terms o<span class=\"_ _2\"></span>f the tariff methodology drawn up by t<span class=\"_ _e\"></span>he CREG. The co<span class=\"_ _2\"></span>sts taken into account include the forecast value of the authorised remuneration of the invested capital, an e<span class=\"_ _e\"></span>stimate of the amoun<span class=\"_ _2\"></span>ts allocated to Elia in the form of performance incentives and the predicted values of various cost categories. These co<span class=\"_ _e\"></span>sts are subdivided<span class=\"_ _2\"></span> into three groups: controllable costs, for which Elia is offered a financial incent<span class=\"_ _e\"></span>ive to improve its efficiency levels; non-controllab<span class=\"_ _2\"></span>le costs, over which Elia has no influence and for which deviations from the budget are completely allocated to the<span class=\"_ _e\"></span> calculation of future tariffs; a<span class=\"_ _2\"></span>nd influenceable costs, to which a hybrid rule applies (see the information provided below with reg<span class=\"_ _e\"></span>ard to controllable and non-controllab<span class=\"_ _2\"></span>le costs and income and influenceable <span class=\"_ _e\"></span>costs). FAIR REMUNERATION Fair remunera<span class=\"_ _2\"></span>tion is the return on capital invested in the grid <span class=\"_ _e\"></span>based on the Capital Asset Pricing Model (<span class=\"ff40\">CAPM</span>). It is based on the average annual value of the r<span class=\"_ _2\"></span>egulat<span class=\"ls78\">ed</span> asset base (RAB), which is calcu<span class=\"_ _2\"></span>lated annually, taking into account new investments, di<span class=\"ls0\">vestments, depreciations and changes in working capital. </span>Since 1 January 2020, the formula<span class=\"_ _2\"></span> has changed compared to the previous tariff methodology with r<span class=\"_ _e\"></span>egard <span class=\"ls1d\">to</span> the level of leverage and the OLO interest r<span class=\"_ _2\"></span>ate for risk free investment: (i) the regulatory <span class=\"_ _e\"></span>leverage has been increased from 33%. to 40%., and (ii) the OLO has been set at 2.4%. for t<span class=\"_ _2\"></span>he period 2020-2023, instead of taking the average of the year, each year. In the event of a major change in the Belgian macro-economic situation and/or in its market circumstances, the CREG and Elia can agree <span class=\"ls5b\">on </span>a modificat<span class=\"_ _e\"></span>ion of the fixed OLO rate. The formu<span class=\"_ _2\"></span>la for the calculation of fair remuneration is as f<span class=\"_ _e\"></span>ollows: A: [S (if less tha<span class=\"_ _2\"></span>n or equal to 40%<span class=\"ff42\">) x average RAB x [(1 + <span class=\"_ _e\"></span>\u03b1) x [(OLO (n) + (\u03b2 x risk </span>premium)]]] plus B: [(S (if abo<span class=\"_ _2\"></span>ve 40%) <span class=\"ff42\">\u2013</span> <span class=\"ls5b\">40%<span class=\"_ _e\"></span></span>) x average RAB x (OLO (n) + 70 base points)]<span class=\"_ _e\"></span> Where: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">OLO (<span class=\"_ _2\"></span>n) has been fixed at 2.4% and is no longer the average rate of Belgian ten-year linear bonds for the year in q<span class=\"_ _e\"></span>uestion </span></span>(subject to mo<span class=\"_ _2\"></span>dification agreed betw<span class=\"_ _e\"></span>een CREG and the Issuer as set out above); \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">RAB (n) =<span class=\"_ _2\"></span> RAB (n-1) + investments (n) - depreciation (n) -<span class=\"_ _e\"></span> divestments (n) - decommissioning (n) +/- change in working capital </span></span>need;<span class=\"ls0\"> </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">S = the<span class=\"_ _2\"></span> consolidated average capital and reserves/average RAB, in accordance with Belgia<span class=\"_ _e\"></span>n GAAP; </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff42 fc3\">Alpha (<span class=\"_ _2\"></span>\u03b1) = th<span class=\"ff3f\">e illiquidity premium set at 10%;<span class=\"_ _e\"></span> </span></span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Beta (<span class=\"ff42\">\u03b2)<span class=\"_ _2\"></span> = calculated over a historical three<span class=\"ff3f\">-year period, taking into account available information on the Issuer's share price in </span></span></span></span>this period, compar<span class=\"_ _2\"></span>ed with the Bel20 index over the same period. The value of the beta cannot be lower than 0.53;<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Risk prem<span class=\"_ _2\"></span>ium remains at 3.5%;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In r<span class=\"_ _2\"></span>espect of A: The rate of remuneration (in %) as set by the CREG for year n is equal to the sum of the risk-free ra<span class=\"_ _e\"></span>te, i.e. the </span></span>average rate of Belg<span class=\"_ _2\"></span>ian ten-year li<span class=\"_ _e\"></span>near bonds for the year in question (OLO (n)) and a prem<span class=\"_ _2\"></span>ium for market risk for shares, weighted u<span class=\"_ _2\"></span>sing the applicable beta factor. Tariff regulation sets the risk premium at 3.5<span class=\"_ _e\"></span>%<span class=\"ls1d\">. </span>The CREG encourages the Elia to keep its actual ca<span class=\"_ _2\"></span>pital and reserves as close as possible to 40<span class=\"_ _e\"></span>%., this ratio being used to calculate a reference value of capital and reserve<span class=\"_ _2\"></span>s; <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In r<span class=\"_ _2\"></span>espect of B: If the Elia's actual capital and reserves are higher than the reference capital and reserves, the surpl<span class=\"_ _e\"></span>us amount is </span></span>balanced<span class=\"_ _2\"></span> out with a reduced rate of remuneration calculated using the following formula: [(OLO (n) + 70 base point<span class=\"_ _e\"></span>s)]; \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Assets rela<span class=\"_ _2\"></span>ted to the MOG are linked to the RABMOG, for which a premium remuneration is applicable in addition <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>o the above. </span></span>This is based on<span class=\"_ _2\"></span> the following formula: [S<span class=\"_ _e\"></span> (less than or equal to 40<span class=\"_ _2\"></span>%) x<span class=\"_ _e\"></span> average RABMOG x 1.4%]. Non-controllable cost<span class=\"_ _2\"></span>s and revenues The ca<span class=\"_ _2\"></span>tegory of costs and revenues that are outside Elia's direct control are not subject to incentive mechanis<span class=\"_ _e\"></span>ms offered by the CREG, and are an<span class=\"_ _2\"></span> integral part of the costs and revenues used to determine the tariffs. The tariffs are set based on forecast values fo<span class=\"_ _e\"></span>r these costs and revenues, and the differen<span class=\"_ _2\"></span>ce from the actual values is allocated ex post to the tariff calculation for the su<span class=\"_ _e\"></span>bsequent period. The most importa<span class=\"_ _2\"></span>nt non-controllable costs consist of the f<span class=\"_ _e\"></span>ollowing items:<span class=\"_ _2\"></span> depreciation of tangible fixed assets, ancillary services (except for the reservation<span class=\"_ _2\"></span> costs of ancillary services excluding black start, which qualify as influence-<span class=\"_ _e\"></span>able costs), costs related to line relocation imposed by a public au<span class=\"_ _2\"></span>thority, and taxes, partially compensated by revenues from non-<span class=\"_ _e\"></span>tariff activities (e.g. cross border congestion revenues). In this n<span class=\"_ _2\"></span>ew tariff period, certain exceptional co<span class=\"_ _e\"></span>sts specific to offshore assets (e.g. the MOG) have been added<span class=\"_ _2\"></span> to the list of non<span class=\"ls0\">-controllable costs. This also includes financial charge<span class=\"_ _e\"></span>s/revenues for which the prin<span class=\"_ _2\"></span>ciple of financial embedded debt has been </span>confirmed. As a co<span class=\"_ _2\"></span>nsequence, all actual and reasonable finance costs related to debt financing are included in the tariffs.<span class=\"_ _20\"></span> Controllable<span class=\"_ _2\"></span> costs and revenues<span class=\"_ _e\"></span> The co<span class=\"_ _2\"></span>sts and revenues over which Elia has direct control are subject to an incentive regulation mechanism, meaning that they a<span class=\"_ _e\"></span>re subject to a shar<span class=\"_ _2\"></span>ing rule of productivity and efficiency improvement which may occur during the regulatory period. The sharing<span class=\"_ _e\"></span> factor is 50<span class=\"ls0\">%. Therefore, Elia is encouraged to control a defined catego<span class=\"_ _2\"></span>ry of its costs and revenue. Any savings with respect to the <span class=\"_ _e\"></span>allowed </span>(adjusted) b<span class=\"_ _2\"></span>udget positively impacts the net profit of the E<span class=\"_ _e\"></span>lia by 50% of the amount (before tax) and, a<span class=\"_ _2\"></span>ccordingly, a<span class=\"_ _e\"></span>ny overspending negatively affects its<span class=\"_ _2\"></span> profit. There have been no changes compared with t<span class=\"_ _e\"></span>he previous tariff methodology, except for certain non-recurrent but con<span class=\"_ _2\"></span>trollable costs specific to offshore assets (e.g. the MOG) that can be added to the cost allowance for a given re<span class=\"_ _e\"></span>gulatory period. Influenceab<span class=\"_ _2\"></span>le costs The reservation co<span class=\"_ _2\"></span>sts for ancillary services, except for black <span class=\"_ _e\"></span>start, and costs of energy to compensate for grid<span class=\"_ _2\"></span> losse<span class=\"_ _e\"></span>s are qualified a<span class=\"_ _2\"></span>s influenceable cost<span class=\"_ _2\"></span>s, meaning that efficiency gains create a positive incentive, insofar as they are not caused by a certa<span class=\"_ _e\"></span>in list of external factors. 20% of the difference<span class=\"_ _2\"></span> in expenses between Y-<span class=\"_ _e\"></span>1 and Y constitutes a profit (pre-tax) for the Elia, with a cap of +<span class=\"ff42\">\u20ac6 million. For </span>each of <span class=\"_ _2\"></span>the two categories of influenceable costs (power r<span class=\"_ _e\"></span>eserves and grid losses), the<span class=\"_ _2\"></span> incentive cannot be less than \u20ac0.<span class=\"_ _20\"></span><span class=\"ff3f\"> </span>Other incentive<span class=\"_ _2\"></span>s T<span class=\"ls5b\">he </span>tariff predefined by the regulator includes, besides the fair remu<span class=\"_ _2\"></span>neration, all the incentives listed below. If Elia does not<span class=\"_ _e\"></span> perform in line with the<span class=\"_ _2\"></span> targets for these incentives, as set by the regulator, the amount of the incentive allocated to Elia will decrease. The impact is reflected in the<span class=\"_ _2\"></span> deferred revenues which will generate future tariff decreases, see the description of the settlement mechanism below (all amounts are p<span class=\"_ _2\"></span>re-tax).<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff45 fc3\">Mar<span class=\"_ _2\"></span>ket integration:<span class=\"ff3f\"> This incentive consists of three elements under the previous regulatory framework: (i) increase of import </span></span></span>capacity, (<span class=\"_ _2\"></span>ii) increase in market welfare due to market cou<span class=\"_ _e\"></span>pling and (iii) financial participations. Only the incentive on financial participations remains.<span class=\"_ _2\"></span> The incentive <span class=\"_ _e\"></span>on market welfare is no longer offered, whereas the one on import capacity has been replaced by an incentive with a sim<span class=\"_ _2\"></span>ilar objective (increase of cross-bor<span class=\"_ _e\"></span>der commercial exchange capacity) but with a fairly different me<span class=\"_ _2\"></span>asurement method. Additionally, a n<span class=\"_ _e\"></span>ew incentive has been created concerning the timely commissioning of investmen<span class=\"_ _2\"></span>t projects contributing to market integration. These incentives can contribute positively to the E<span class=\"_ _e\"></span>lia<span class=\"ff42\">\u2019s profit (from \u20ac</span>0 to <span class=\"ff42\">\u20ac</span><span class=\"ls5b\">16 </span>million for<span class=\"_ _2\"></span> cross-border capacity, from <span class=\"ff42\">\u20ac</span>0 to <span class=\"ff42\">\u20ac<span class=\"_ _e\"></span></span><span class=\"ls5b\">7 </span>million for timely commissioning). The profit (dividends and capital gains) resulting from financial participations in o<span class=\"_ _2\"></span>ther compa<span class=\"_ _e\"></span>nies which the CREG has accepted as being part of the RAB, is allocated as follows: 40% is allocated<span class=\"_ _2\"></span> to future tariff reductions an<span class=\"_ _e\"></span>d 60% is a<span class=\"ff42\">llocated to Elia\u2019s profit )</span>. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff45 fc3\">Investm<span class=\"_ _2\"></span>ent program<span class=\"ls8f\">me</span>:<span class=\"ff3f\"> This inc<span class=\"_ _e\"></span>entive is broadened and is defined<span class=\"_ _2\"></span> as follows: (i) if the average interruption time (AIT) reaches a </span></span></span>target predefined by the CREG, Elia<span class=\"ff42\">\u2019s net profit (pre</span>-tax) could be impacted positive<span class=\"_ _2\"></span>ly with a maximum of <span class=\"ff42\">\u20ac</span>4<span class=\"_ _e\"></span>.8 million, (ii) should the availa<span class=\"_ _2\"></span>bility of the MOG align with the level set by th<span class=\"_ _e\"></span>e CREG, the incentive can contribute to the Elia<span class=\"ff42\">\u2019s profit from \u20ac</span>0 to <span class=\"ff42\">\u20ac</span>2.53 million and<span class=\"_ _2\"></span> (iii) Elia could benefit from <span class=\"ff42\">\u20ac</span>0 t<span class=\"_ _e\"></span>o <span class=\"ff42\">\u20ac</span>2 million if the predefined portfolio of mainta<span class=\"_ _2\"></span>in<span class=\"_ _e\"></span><span class=\"ls5b\">ed</span> and redeploy<span class=\"ls5b\">ed</span> investments is realised in time and on budget. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff45 fc3\">Inno<span class=\"_ _2\"></span>vation and grants:<span class=\"ff3f\"> The content and the remuneration of this incentive has changed and covers (i) the r<span class=\"_ _e\"></span>ealisation of innovative </span></span></span>projects wh<span class=\"_ _2\"></span>ich could contribute to the Elia<span class=\"ff42\">\u2019s r<span class=\"_ _e\"></span>emuneration for \u20ac0 to \u20ac</span>3.7 million (pre-tax) and (ii) the subsidies grant<span class=\"_ _e\"></span>ed for innovative project<span class=\"_ _2\"></span>s which could impact the Elia<span class=\"ff42\">\u2019s profit wit<span class=\"_ _e\"></span>h a ma</span>ximum of <span class=\"ff42\">\u20ac</span>0 to <span class=\"ff42\">\u20ac</span>1 million. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff45 fc3\">Quality o<span class=\"_ _2\"></span>f customer related services:<span class=\"ff3f\"> This incentive is bro<span class=\"_ _e\"></span>adened and is related to three incentive<span class=\"_ _2\"></span>s: (i) the level of cl<span class=\"_ _e\"></span>ient </span></span></span>satisfaction related to t<span class=\"_ _2\"></span>he establishment of new grid conn<span class=\"_ _e\"></span>ections which c<span class=\"_ _2\"></span>an generate a profit for Elia of <span class=\"_ _e\"></span><span class=\"ff42\">\u20ac</span>0 to <span class=\"ff42\">\u20ac</span>1.35 million, (ii) the level of client <span class=\"_ _2\"></span>satisfaction for the full client base which would contribute <span class=\"_ _e\"></span>between <span class=\"ff42\">\u20ac</span><span class=\"ls5b\">0 </span>and <span class=\"ff42\">\u20ac</span>2.53 million to Elia<span class=\"ff42\">\u2019s profit<span class=\"_ _e\"></span> and (<span class=\"_ _2\"></span>iii) the </span>quality of the data that Elia publishes on a regular basis, which can g<span class=\"_ _2\"></span>enerate remuneration for <span class=\"_ _e\"></span>Elia of <span class=\"ff42\">\u20ac</span>0 to <span class=\"ff42\">\u20ac</span>5 million. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff45 fc3\">Enhance<span class=\"_ _2\"></span>ment of balance system:<span class=\"ff3f\"> This incentive is similar to the discretionary incentive u<span class=\"_ _e\"></span>nder the previous regulatory framework, </span></span></span>through which Elia is rewarded for implementing certain projects re<span class=\"_ _2\"></span>lated to system balancing as <span class=\"_ _e\"></span>defined by the CR<span class=\"_ _e\"></span>EG. This incentive can generate remuneration<span class=\"_ _2\"></span> between <span class=\"ff42\">\u20ac</span>0 <span class=\"_ _e\"></span>and <span class=\"ff42\">\u20ac</span>2.5 million (pre-tax). Regulator<span class=\"_ _2\"></span>y framework for the Modular Offshore Grid<span class=\"_ _e\"></span> The CREG has amended the 2<span class=\"_ _2\"></span>016-<span class=\"_ _e\"></span>2019 tariff methodology to create specific ru<span class=\"_ _2\"></span>les applicable to investment in the <span class=\"_ _e\"></span>MOG. A formal consultation took place in<span class=\"_ _2\"></span> the first weeks of 2018 between <span class=\"_ _e\"></span>the CREG and the issuer, and the CREG took a decision on 6 December 2018 about <span class=\"_ _2\"></span>the new parameters to be introduced in the tariff methodology. The main features of said parameters w<span class=\"_ _e\"></span>ere (i) a specific risk premium to be applied to<span class=\"_ _2\"></span> this investment (resulting in an additional net return of 1.4<span class=\"_ _e\"></span>%); (ii) a special depreciation rate applicable to MOG assets; (iii) c<span class=\"_ _2\"></span>ertain costs specific to the MOG to bear another qualification compared with<span class=\"_ _e\"></span> the costs for onshore activities; (iv) the cost level defined ba<span class=\"_ _2\"></span>sed on the characteristics of the MOG assets; and (v) dedicated incentives linked to the availability of the <span class=\"_ _e\"></span>offshore assets. For the tar<span class=\"_ _2\"></span>iff period 2020-2023, the regulatory fra<span class=\"_ _e\"></span>mework for the MOG has been included in the tariff methodology, based on the features descr<span class=\"_ _2\"></span>ibed above, except for the risk premium, which has been applied since 1 January 2020 on a ta<span class=\"_ _e\"></span>rget equity/debt ratio of 40/60. Regulator<span class=\"_ _2\"></span>y deferral account: deviations from budgeted val<span class=\"_ _e\"></span>ues Over the cour<span class=\"_ _2\"></span>se of a year, the actual volumes of electricity transmitted may differ from the volumes which are forca<span class=\"_ _e\"></span>sted. If the transmitted vo<span class=\"_ _2\"></span>lumes are higher (or lower) than those forecast, the deviation is booked to an acc<span class=\"_ _e\"></span>rual account during the year in which<span class=\"_ _2\"></span> it occurs. These deviatio<span class=\"_ _2\"></span>ns from budgeted values (a regulatory debt or a regulatory receivable) are accumulated and will be taken int<span class=\"_ _e\"></span>o account when the tar<span class=\"_ _2\"></span>iffs are set for the subsequent tariff p<span class=\"_ _e\"></span>eriod. Regard<span class=\"_ _2\"></span>less of<span class=\"_ _e\"></span> deviations between the forecast parameters for tariff-setting (<span class=\"_ _2\"></span>fair remuneration, non-controllable elements, cont<span class=\"_ _e\"></span>rollable elements<span class=\"_ _2\"></span>, influenceable costs, incentive compone<span class=\"_ _e\"></span>nts, cost and revenue allocation be<span class=\"_ _2\"></span>tween regulated and non-r<span class=\"_ _e\"></span>egulated activities) and the actual incurred costs or revenues related to these parameter<span class=\"_ _2\"></span>s, the CREG takes the final decision each year <span class=\"_ _e\"></span>as to whether the incurred costs/revenue can reasonably be borne b<span class=\"_ _2\"></span>y the tariffs. This de<span class=\"_ _2\"></span>cision may result in the rejection of incurred elements.  In the event that any incurred elements are rejected, the relevant amoun<span class=\"_ _2\"></span>t will not be taken into account when the tariffs are <span class=\"_ _e\"></span>set for the n<span class=\"_ _2\"></span>ext period. Although Elia can ask for a judicial revi<span class=\"_ _e\"></span>ew of any such decision, if th<span class=\"_ _2\"></span>is judicial review were to be uns<span class=\"ff42\">uccess<span class=\"_ _e\"></span>ful, a rejection may well h<span class=\"_ _2\"></span>ave an overall negative impact on Elia\u2019s <span class=\"_ _e\"></span><span class=\"ff3f\">financials. </span></span>Cost and revenue allo<span class=\"_ _2\"></span>cation between regulated and non-regulated activities<span class=\"_ _e\"></span> T<span class=\"ls5b\">he </span>tariff methodology for 2020-2023 features a mechanism enabling Elia to develop activities ou<span class=\"_ _2\"></span>tside the Belgian regulated perimeter and whose costs are n<span class=\"_ _2\"></span>ot covered by grid tariffs in Belgiu<span class=\"_ _e\"></span>m. This methodolog<span class=\"_ _2\"></span>y establishes a mechanism to ensure that Elia's fi<span class=\"_ _e\"></span>nancial participation in o<span class=\"_ _2\"></span>ther companies not considered part of the RAB by <span class=\"_ _e\"></span>the CREG (e.g. stakes in regulated or non-regulated activities outside Belgium) has a neutr<span class=\"_ _2\"></span>al impact on Belgian grid users<span class=\"_ _e\"></span>. Public service ob<span class=\"_ _2\"></span>ligations <span class=\"_ _e\"></span> I<span class=\"ls5b\">n </span>its role as a TSO, Elia is subject to various public service obligations impo<span class=\"_ _2\"></span>sed by the government and/or by regulation mecha<span class=\"_ _e\"></span>nisms. Public author<span class=\"_ _2\"></span>ities/regulation mechanisms identify public service obligations in various fields (such as the promotion of ren<span class=\"_ _e\"></span>ewable energ<span class=\"_ _2\"></span>y, green certificates, strategic reserves, social support, fees for the use of the public domain, offshore liability) fo<span class=\"_ _e\"></span>r fulfilment by TSOs. The<span class=\"_ _2\"></span> costs incurred by the TSO with <span class=\"_ _e\"></span>respect <span class=\"ls1d\">to</span> <span class=\"ff42\">these obligations are fully covered by the tariff \u2018levies\u2019 as approved by the </span>regulator. The amou<span class=\"_ _2\"></span>nts outstanding are reported as levies (see Note 6.<span class=\"ls5b\">10<span class=\"_ _e\"></span></span> for other receivables and Note 6.15 for o<span class=\"_ _e\"></span>ther payables). 9.2. <span class=\"_ _87\"> </span>Regulatory framework in Germany9.2.1. <span class=\"_ _5b\"></span> Relev<span class=\"_ _e\"></span>ant legislation The German lega<span class=\"_ _2\"></span>l framework is laid down in various pieces of legislation. The key law is the German Energy Act (<span class=\"ff45\">Energiewir<span class=\"_ _2\"></span>tschaftsgesetz<span class=\"ls1d\">, </span><span class=\"ff3f\">EnWG), which defines the ove<span class=\"_ _e\"></span>rall legal frame<span class=\"_ _2\"></span>work for the gas and electricity supply industry in Germany. The </span></span>EnWG is complemented by a number of additional laws, ordinan<span class=\"_ _2\"></span>ces and regulatory decisions, which provide detailed rules re<span class=\"_ _e\"></span>garding the curren<span class=\"_ _2\"></span>t system of incentive regulation, accounting methods and grid access arrangements, including:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the O<span class=\"_ _2\"></span>rdinance on Electricity Network Tariffs (<span class=\"ff45\">Verordnung <span class=\"_ _e\"></span>\u00fcber d<span class=\"_ _2\"></span>ie Entgelte f\u00fcr den Zugang zu Elekt<span class=\"_ _e\"></span>rizit\u00e4tsversorgungsnetzen<span class=\"ff3f\"> </span></span></span></span>(<span class=\"ff45\">Stromn<span class=\"_ _2\"></span>etzentgeltverordnung<span class=\"ls1d\">, </span><span class=\"ff3f\">Str<span class=\"_ _e\"></span>omNEV)), which establishes, among other things, the principles and methods for the grid-tariff </span></span>calculations and o<span class=\"_ _2\"></span>ther obligations applying to syst<span class=\"_ _e\"></span>em operators; \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the O<span class=\"_ _2\"></span>rdinance on Electricity Network Access (<span class=\"ff45\">Verordnung \u00fcber den Zugang zu Elektrizit\u00e4tsversorgungsnetzen </span></span></span>(Stromn<span class=\"_ _2\"></span>etzzugangsverordnung<span class=\"ls1d\">, </span><span class=\"ff3f\">St<span class=\"_ _e\"></span>romNZV), which, among other things, sets out further details about how to grant access to the </span>transmission system<span class=\"_ _2\"></span>s (and other types of n<span class=\"_ _e\"></span>etworks) by way of establishing the balancing groups, the scheduling of electricity deliveries, c<span class=\"_ _2\"></span>ontrol energy and other general obligations, e.g. congestion management (<span class=\"ff45\">Eng<span class=\"_ _e\"></span>passmanagement</span>), publication obligation<span class=\"_ _2\"></span>s, metering, minimum requirements for various t<span class=\"_ _e\"></span>ypes of contracts and the duty of certain s<span class=\"_ _2\"></span>ystem operators to manage the balancing amount system<span class=\"_ _2\"></span> for renewable energy;<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the O<span class=\"_ _2\"></span>rdinance on Incentive Regulation (<span class=\"ff45\">Verordnung \u00fcber die Anreizregulierung der Energieversorgungsnetze </span></span></span>(Anreizregulierungsverordnung<span class=\"ls1d\">, </span><span class=\"ff3f\">ARegV)), which sets out the basic rules for incentive regulation for TSOs and other system </span>opera<span class=\"_ _2\"></span>tors (as outlined in more detail below). It also descri<span class=\"_ _e\"></span>bes in genera<span class=\"_ _2\"></span>l terms how to benchmark efficiency, which costs are included in<span class=\"_ _2\"></span> the efficiency benchmarking, how to determine inefficiency and how this translates into yearly targets for efficiency growth.9.2.2. <span class=\"_ _5b\"></span> Reg<span class=\"_ _e\"></span>ulatory agencies in Germany The regula<span class=\"_ _2\"></span>tory agencies for the energy sector in German<span class=\"_ _e\"></span>y are the <span class=\"ff45\">Bundesnetzagentur</span> (BNetzA, or Federal Network Agency) in Bonn for grids to wh<span class=\"_ _2\"></span>ich over 100,000 grid users are directly or indirectly connected; and the specific regulatory authorities in the v<span class=\"_ _e\"></span>arious federal states for grid<span class=\"_ _2\"></span>s to which fewer than 100,000 grid users are directly or indirectly connected. The regulatory agencies<span class=\"_ _e\"></span> are, among other things, in charge of ensur<span class=\"_ _2\"></span>ing non-discriminatory third<span class=\"_ _e\"></span>-party access to grids and monitoring the grid-use tariffs levied by the TSOs. 50Hertz Tran<span class=\"_ _2\"></span>smission and 50Hertz Offshore are subject t<span class=\"_ _e\"></span>o the authority of the Federal Network Agency.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.9.2.3. <span class=\"_ _5b\"></span> Ta<span class=\"_ _e\"></span>riff setting in Germany The current re<span class=\"_ _2\"></span>gulation mechanism is established in Germany by the ARegV. Under the ARegV, grid tariffs are defined to generat<span class=\"_ _e\"></span>e a pre-defined<span class=\"_ _2\"></span> 'revenue cap' as determined by the Federal Network Agency for each TSO and for each regulatory period. The revenue cap<span class=\"_ _e\"></span> is essentially ba<span class=\"_ _2\"></span>sed on the costs of a base year, and is fixed for the entire regulatory period, except when it is adjusted to account for specific cases provided for<span class=\"_ _2\"></span> in the ARegV. System operato<span class=\"_ _e\"></span>rs are not allo<span class=\"_ _2\"></span>wed to retain revenue in excess of their indi<span class=\"_ _e\"></span>vidually <span class=\"_ _e\"></span>determined revenue cap. <span class=\"_ _2\"></span>Each regulatory period lasts five years, with the third regulatory period starting on 1st January <span class=\"_ _e\"></span>2019 and ending on 31st December 2023 an<span class=\"_ _2\"></span>d the fourth starting on 1st January 2024 and ending 31st December 2028. Tariffs are public and cannot be the<span class=\"_ _e\"></span> subject of nego<span class=\"_ _2\"></span>tiations with customers. Only certain customers (under certain set circumstances laid down in <span class=\"_ _e\"></span>the relevant legislation) are allowed to agre<span class=\"_ _2\"></span>e to individual tariffs under Article 19 of the StromNEV (for example, in the<span class=\"_ _2\"></span> case of sole use of a grid a<span class=\"_ _e\"></span>sset). The Federal Networ<span class=\"_ _2\"></span>k Agency has to approve such individual tariffs.<span class=\"_ _e\"></span> For the purpose<span class=\"_ _2\"></span>s of the revenue cap, the costs incurred by a system operator fall into two categories as follows:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Perma<span class=\"_ _2\"></span>nently non-influenceable costs (PNIC): These costs are fully integrated into the 'revenue cap' and are fully recovered </span></span>through the<span class=\"_ _2\"></span> grid tariffs, albeit some of them wi<span class=\"_ _e\"></span>th a two-year time lag. o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">One <span class=\"_ _5d\"></span>cost <span class=\"_ _20\"></span>positi<span class=\"_ _e\"></span>on <span class=\"_ _5d\"></span>amongst <span class=\"_ _20\"></span>the <span class=\"_ _5d\"></span>PNIC <span class=\"_ _5d\"></span>refers <span class=\"_ _5d\"></span>to <span class=\"_ _5d\"></span>investment <span class=\"_ _5d\"></span>measures, <span class=\"_ _20\"></span>meaning <span class=\"_ _5d\"></span>costs <span class=\"_ _5d\"></span>resulting <span class=\"_ _5d\"></span>from <span class=\"_ _20\"></span>new <span class=\"_ _5d\"></span>investm<span class=\"_ _e\"></span>ents <span class=\"_ _20\"></span>in<span class=\"_ _e\"></span> </span></span>onshore <span class=\"_ _e\"></span>grid <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>nfrastructure <span class=\"_ _20\"></span>(ne<span class=\"_ _2\"></span>w <span class=\"_ _20\"></span>onshore <span class=\"_ _e\"></span>investments <span class=\"_ _20\"></span>will <span class=\"_ _20\"></span>be <span class=\"_ _e\"></span>refinanced <span class=\"_ _20\"></span>from <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>fourth <span class=\"_ _e\"></span>regulatory <span class=\"_ _20\"></span>period <span class=\"_ _20\"></span>onward<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>via <span class=\"_ _e\"></span>the reque<span class=\"_ _2\"></span>sted <span class=\"_ _20\"></span>c<span class=\"_ _e\"></span>apital <span class=\"_ _20\"></span>c<span class=\"_ _e\"></span>ost <span class=\"_ _20\"></span>adjustment). <span class=\"_ _5d\"></span>The <span class=\"_ _20\"></span>investment <span class=\"_ _5d\"></span>measures <span class=\"_ _20\"></span>include <span class=\"_ _5d\"></span>return <span class=\"_ _20\"></span>on <span class=\"_ _5d\"></span>equity, <span class=\"_ _20\"></span>imputed <span class=\"_ _20\"></span>t<span class=\"_ _e\"></span>rade <span class=\"_ _20\"></span>tax,<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>cost <span class=\"_ _5d\"></span>of <span class=\"_ _20\"></span>debt,<span class=\"_ _e\"></span> depre<span class=\"_ _2\"></span>ciation <span class=\"_ _20\"></span>and <span class=\"_ _e\"></span>o<span class=\"_ _e\"></span>perational <span class=\"_ _e\"></span>costs <span class=\"_ _20\"></span>(currently <span class=\"_ _e\"></span>at <span class=\"_ _20\"></span>a <span class=\"_ _20\"></span>fixed <span class=\"_ _20\"></span>rate <span class=\"_ _e\"></span>of <span class=\"_ _20\"></span>0.8% <span class=\"_ _20\"></span>of <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>capitalised <span class=\"_ _e\"></span>investment <span class=\"_ _20\"></span>costs <span class=\"_ _20\"></span>of <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>respectiv<span class=\"_ _e\"></span><span class=\"ls78\">e </span>onshore investments or 0.2 % <span class=\"_ _e\"></span>for assets under const<span class=\"_ _e\"></span>ruction within projects app<span class=\"_ _e\"></span>roved as of 201<span class=\"_ _e\"></span>9). The cost of de<span class=\"_ _e\"></span>bt related<span class=\"_ _e\"></span> to investment measures is <span class=\"_ _e\"></span>reflected in <span class=\"_ _e\"></span>the interest <span class=\"_ _e\"></span>rate ba<span class=\"_ _e\"></span>sed on acquired deb<span class=\"_ _e\"></span>t for the <span class=\"_ _e\"></span>TSO <span class=\"_ _e\"></span>activity. Since <span class=\"_ _e\"></span>2012, the costs<span class=\"_ _e\"></span> associated <span class=\"_ _20\"></span>with <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>hese <span class=\"_ _20\"></span>investment <span class=\"_ _20\"></span>measures <span class=\"_ _20\"></span>have <span class=\"_ _20\"></span>been <span class=\"_ _20\"></span>based <span class=\"_ _20\"></span>on <span class=\"_ _20\"></span>forecast <span class=\"_ _e\"></span>val<span class=\"_ _e\"></span>ues. <span class=\"_ _20\"></span>The <span class=\"_ _20\"></span>differences <span class=\"_ _20\"></span>between <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>forecast<span class=\"_ _e\"></span> values and the actual v<span class=\"_ _2\"></span>alues are reflected in the settlement mechanism deferral account.<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">In <span class=\"_ _2\"></span>additio<span class=\"_ _2\"></span>n, <span class=\"_ _2\"></span>PNIC <span class=\"_ _2\"></span>include<span class=\"_ _2\"></span> <span class=\"_ _4b\"></span>costs relatin<span class=\"_ _2\"></span>g <span class=\"_ _2\"></span>to <span class=\"_ _4b\"></span>ancillary <span class=\"_ _2\"></span>services, g<span class=\"_ _2\"></span>rid <span class=\"_ _4b\"></span>losses <span class=\"_ _4b\"></span>a<span class=\"_ _e\"></span>nd <span class=\"_ _4b\"></span>re<span class=\"_ _e\"></span>dispatch <span class=\"_ _4b\"></span>c<span class=\"_ _e\"></span>osts, <span class=\"_ _4b\"></span>as <span class=\"_ _2\"></span>well <span class=\"_ _4b\"></span>as <span class=\"_ _2\"></span>European <span class=\"_ _4b\"></span>i<span class=\"_ _e\"></span>nitiatives<span class=\"_ _e\"></span> </span></span>and costs from <span class=\"_ _e\"></span>congestion management. <span class=\"_ _e\"></span>These costs <span class=\"_ _e\"></span>and <span class=\"_ _e\"></span>income are included in <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>revenue cap <span class=\"_ _e\"></span>based on <span class=\"_ _e\"></span>a procedural<span class=\"_ _e\"></span> regulation m<span class=\"_ _e\"></span>echanism <span class=\"_ _e\"></span>set <span class=\"_ _20\"></span>by <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>F<span class=\"_ _e\"></span>ederal <span class=\"_ _e\"></span>Netwo<span class=\"_ _e\"></span>rk <span class=\"_ _e\"></span>Agency <span class=\"_ _20\"></span>in acco<span class=\"_ _e\"></span>rdance <span class=\"_ _e\"></span>wi<span class=\"_ _e\"></span>th <span class=\"_ _e\"></span>A<span class=\"_ _e\"></span>rticle <span class=\"_ _e\"></span>11<span class=\"_ _e\"></span>(2) <span class=\"_ _e\"></span>of <span class=\"_ _e\"></span>th<span class=\"_ _e\"></span>e <span class=\"_ _e\"></span>ARegV. <span class=\"_ _20\"></span>The <span class=\"_ _e\"></span>regulatio<span class=\"_ _e\"></span>n process <span class=\"_ _5d\"></span>for <span class=\"_ _5d\"></span>costs <span class=\"_ _5d\"></span>relating <span class=\"_ _5d\"></span>to <span class=\"_ _5d\"></span>ancilla<span class=\"_ _e\"></span>ry <span class=\"_ _5d\"></span>services, <span class=\"_ _5d\"></span>congesti<span class=\"_ _e\"></span>on <span class=\"_ _5d\"></span>management <span class=\"_ _5d\"></span>and <span class=\"_ _5d\"></span>grid <span class=\"_ _5d\"></span>losses <span class=\"_ _5d\"></span>gives <span class=\"_ _5d\"> </span>th<span class=\"_ _e\"></span>e <span class=\"_ _5d\"></span>system <span class=\"_ _5d\"> </span>oper<span class=\"_ _e\"></span>ator <span class=\"_ _5d\"></span>an incentive <span class=\"_ _20\"></span>to <span class=\"_ _5d\"></span>outperform <span class=\"_ _20\"></span>t<span class=\"_ _e\"></span>he <span class=\"_ _5d\"></span>planned <span class=\"_ _20\"></span>costs <span class=\"_ _5d\"></span>through <span class=\"_ _5d\"></span>bonu<span class=\"_ _e\"></span>s/malus <span class=\"_ _20\"></span>mechanisms. <span class=\"_ _5d\"></span>Moreover, <span class=\"_ _20\"></span>costs <span class=\"_ _24d\"> </span>resultin<span class=\"_ _e\"></span>g <span class=\"_ _5d\"></span>from <span class=\"_ _20\"></span>Eu<span class=\"_ _e\"></span>ropean projects of <span class=\"_ _e\"></span>c<span class=\"_ _e\"></span>ommon <span class=\"_ _e\"></span>inte<span class=\"_ _e\"></span>rest (PCI) <span class=\"_ _20\"></span>to <span class=\"_ _e\"></span>which <span class=\"_ _e\"></span>Germany <span class=\"_ _e\"></span>is <span class=\"_ _20\"></span>contributing <span class=\"_ _e\"></span>can <span class=\"_ _e\"></span>be <span class=\"_ _e\"></span>include<span class=\"_ _e\"></span>d <span class=\"_ _e\"></span>as <span class=\"_ _e\"></span>PNIC, <span class=\"_ _20\"></span>albeit with <span class=\"_ _20\"></span>a <span class=\"_ _e\"></span>two<span class=\"_ _e\"></span>-ye<span class=\"_ _e\"></span>ar <span class=\"_ _e\"></span>time<span class=\"_ _e\"></span> lag. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Tem<span class=\"_ _2\"></span>porarily non-influenceable costs (TNIC) and influenceable costs (IC): These costs include return on equity, de<span class=\"_ _e\"></span>preciation, cost </span></span>of debt, impu<span class=\"_ _2\"></span>ted trade tax and other operational expenses. They are subject to an incentive mechanism set by the Federal Network Agen<span class=\"_ _2\"></span>cy, which features an efficiency factor (only applicable to IC), a productivity improvement factor and <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>n inflation factor (applica<span class=\"_ _2\"></span>ble to both TNIC and IC) over a five-yea<span class=\"_ _e\"></span>r period. In addition, the current incentive mechanism provides for the use<span class=\"_ _2\"></span> of a quality factor, bu<span class=\"_ _2\"></span>t the criteria and implementation mechanism for this factor for TSOs are yet to be defined <span class=\"_ _e\"></span>by the Federal Network Agen<span class=\"_ _2\"></span>cy. The various defined factors give the TSOs the medium-term objective of eliminating what are dee<span class=\"_ _e\"></span>med inefficient costs. As regards the cost<span class=\"_ _2\"></span> of debt, the permitted cost of d<span class=\"_ _e\"></span>ebt re<span class=\"_ _2\"></span>lated to influenceable costs needs to be shown <span class=\"_ _e\"></span>to b<span class=\"_ _e\"></span>e marketable. As for the return o<span class=\"_ _2\"></span>n equity, the relevant laws and regulations set out the provisions relating to the permitted return on equ<span class=\"_ _e\"></span>ity, which is included in<span class=\"_ _2\"></span> the TNIC/IC for assets belonging to the regulated asset base and the PNIC for assets a<span class=\"_ _e\"></span>pproved in investment measures. In 2021, the BNetzA de<span class=\"_ _2\"></span>termined the return on equity applicable to the fourth and coming regulatory period (2024-20<span class=\"_ _e\"></span>28); the values were significantly do<span class=\"_ _2\"></span>wn from the third regulatory period, namely to 3.51% (instead of 5.12% in<span class=\"_ _e\"></span> the third period) for investments made before 2006 and 5.07% (instead o<span class=\"_ _2\"></span>f 6.91% in the third period) for investments made since 2006. The return on equity is calculated bef<span class=\"_ _e\"></span>ore corporate ta<span class=\"_ _2\"></span>x and after imputed trade tax.<span class=\"_ _e\"></span> Separate<span class=\"_ _2\"></span>ly from the revenue cap, 50Hertz is compensate<span class=\"_ _e\"></span>d for costs incurred in connection with its renewable energy obliga<span class=\"_ _2\"></span>tions, including EEG and<span class=\"_ _2\"></span> CHP/KWKG obligations, offshore liabili<span class=\"_ _e\"></span>ties and its <span class=\"_ _2\"></span>obligations from the electricity price brake. To this en<span class=\"_ _e\"></span>d, various surcharges (<span class=\"_ _2\"></span>levies) have been implemented that are subject to specific regulatory mechanisms aimed at a balanced treatment of costs and income. CHANGES IN TARIFF REGULATIONS  The capital cost adjustment mode<span class=\"_ _2\"></span>l will be used for TSOs in the fourth regulatory period. In order to <span class=\"_ _e\"></span>avoid distortion effects in the co<span class=\"_ _2\"></span>st base, a tran<span class=\"_ _2\"></span>sitional arrangement will come into effect. It in<span class=\"_ _e\"></span>cludes an extensive<span class=\"_ _2\"></span> grandfathering of existing investment measur<span class=\"_ _e\"></span>es during the fourth regula<span class=\"_ _2\"></span>tory period, the elimination and an extensive repayment of the cla<span class=\"_ _e\"></span>wback for expired investment measures, as well as a transitional base<span class=\"_ _2\"></span> for replacement investments in the period of incentive regulation (2007 to the end of 2021).<span class=\"_ _e\"></span> As of 31st December 2022, 50<span class=\"_ _2\"></span>Hertz had received 95 approvals for an investment volume of app<span class=\"_ _e\"></span><span class=\"ff42\">roximately \u20ac 15.0 bil<span class=\"_ _e\"></span>lion for t<span class=\"_ _2\"></span>he 11<span class=\"_ _e\"></span><span class=\"ff3f\">9 </span></span>active app<span class=\"_ _2\"></span>lications for approval of investment measures submitted since 2008.<span class=\"_ _e\"></span> TARIFFS Grid access <span class=\"_ _2\"></span>tariffs of the German TSOs for 2023 have be<span class=\"_ _e\"></span>en calculated on<span class=\"_ _2\"></span> the combined revenue caps taking into a<span class=\"_ _e\"></span>ccount a subsidy of<span class=\"_ _e\"></span> \u20ac12.84<span class=\"_ _2\"></span> billion (50Hertz share approx. \u20ac1.1 billion). The subsidy pursuant to \u00a7 24b EnWG was introduced as part of the Electri<span class=\"_ _e\"></span><span class=\"ff3f\">city Price </span>Damping Act (<span class=\"_ _2\"></span>Strompreisbremsegesetz - S<span class=\"_ _e\"></span>tromPBG) to stabilise the tariffs at the level of 2022 and is financed from the skimming profits pursuant to the StromPBG. As a tra<span class=\"_ _2\"></span>nsitional measure, fun<span class=\"_ _e\"></span>ds from<span class=\"_ _2\"></span> the EEG <span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span> former federal grants to stabilize the EEG <span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span> and addition<span class=\"_ _2\"></span>al federa<span class=\"_ _2\"></span>l funds from the Economy Stabilization Fund (Wirtschaftsstabilisierungsfonds <span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span> WSF) can be used for interim<span class=\"_ _e\"></span> financing. If this interim f<span class=\"_ _2\"></span>inancing is also insufficient, the transmission syst<span class=\"_ _e\"></span>em operators are en<span class=\"_ _2\"></span>titled to adjust their network charges <span class=\"_ _e\"></span>once du<span class=\"_ _e\"></span>ring the year in the calendar year<span class=\"_ _2\"></span> 2023.  Due to the subsidy, the tariffs only increased by 2.6% compare<span class=\"_ _e\"></span>d to 2022. The main reason for the increase in the revenue cap wa<span class=\"_ _2\"></span>s the drastic increase of prices on the energy markets and the resulting costs for especially redispatch, <span class=\"_ _e\"></span>the procurement of grid losse<span class=\"_ _2\"></span>s and balancing power.<span class=\"_ _e\"></span> 9.3. <span class=\"_ _87\"> </span>Regulatory framework for the Nemo Link<span class=\"_ _e\"></span> interconnector The ke<span class=\"_ _2\"></span>y features of the NemoLink Ltd. <span class=\"_ _e\"></span>regulatory framework can<span class=\"_ _2\"></span> be summarised as follows: <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">A specific re<span class=\"_ _2\"></span>gulatory framework <span class=\"ls1c\">is</span> applicable to the Nemo Link interconnector since the date of operation. The framework is part </span></span>of the new tar<span class=\"_ _2\"></span>iff methodology issued on 18 December 2014<span class=\"_ _e\"></span>, updated on 5 March 2020 (Cap &amp; Floor final levels), by the CREG. The cap and<span class=\"_ _2\"></span> floor regime is a revenue-b<span class=\"_ _e\"></span>ased regime with a term of 25 years. The national regulators in the UK and Belgium (OFGEM and the CREG resp<span class=\"_ _2\"></span>ectively) determined the levels of the cap and floor ex-<span class=\"_ _e\"></span>ante and these remain largely fixed (in real term)<span class=\"_ _2\"></span> for the duration of the regime. Consequently, inv<span class=\"_ _e\"></span>estors will have certainty about the regulatory framework thr<span class=\"_ _e\"></span>oughout the li<span class=\"ls0\">fetime o<span class=\"_ _2\"></span>f the interconnector.<span class=\"_ _e\"></span> </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> cap and floor regime is applicable since 30 January 2019. Every five years, the reg<span class=\"_ _e\"></span>ulators will assess the cumulative </span></span>interconnector revenues (net of an<span class=\"_ _2\"></span>y market-r<span class=\"_ _e\"></span>elated costs) over the period against the cumulative cap and floo<span class=\"_ _2\"></span>r level<span class=\"_ _e\"></span>s to determine whether<span class=\"_ _2\"></span> the cap or floor is triggered. <span class=\"ls1d\">If a</span> r<span class=\"_ _e\"></span>evenue rises above the cap, it will b<span class=\"ls5b\">e <span class=\"_ _e\"></span></span>returned to the TSO in the UK (National Electricity Transmission System<span class=\"_ _2\"></span> Operator or \u2018NETSO\u2019) and to the T<span class=\"_ _e\"></span>SO in Belgium on<span class=\"_ _2\"></span> a 50/50 basis. The TSOs <span class=\"_ _e\"></span><span class=\"ff3f ls1c\">will <span class=\"ls0\">then reduce the grid </span></span>charge<span class=\"_ _2\"></span>s for grid users in their respective countries. If revenue falls below the floor, <span class=\"_ _e\"></span>then the interconnector owners <span class=\"ls1c\">will <span class=\"ls5b\">be </span></span>compen<span class=\"_ _2\"></span>sated by the TSOs. The TSOs will, in turn, recover the costs through grid charges. National Grid performs the NETSO role in the UK and<span class=\"_ _2\"></span> the Issuer, the Belgian TSO, in Belgium. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Each five-ye<span class=\"_ _2\"></span>ar period <span class=\"ls1c\">is</span> considered separately. Cap and floor adjustments in one period will not affect adjustments for fu<span class=\"_ _2\"></span>ture </span></span>periods,<span class=\"_ _2\"></span> and total revenue earned in one period is not <span class=\"_ _e\"></span>taken into account in future periods. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> high-level tariff design is as follows: </span></span>Regime length 25 yea<span class=\"ls8f\">rs</span> Cap and f<span class=\"_ _2\"></span>loor levels<span class=\"_ _e\"></span> Levels are set a<span class=\"_ _2\"></span>t the start of the regime and remain fixed i<span class=\"_ _e\"></span>n real terms <span class=\"_ _2\"></span>for 25 year<span class=\"_ _2\"></span>s from the start of operation. Based on applying mechanistic parameter<span class=\"_ _2\"></span>s to cost-efficiency: a cost of debt benchmark w<span class=\"_ _e\"></span>as applied to costs to set<span class=\"_ _2\"></span> the floor, and an equity return benchmark wa<span class=\"_ _e\"></span>s applied to set the cap. Assessment period (assessin<span class=\"_ _2\"></span>g whether Every five years, with with<span class=\"_ _2\"></span>in<span class=\"_ _e\"></span>-period adjustments if needed and just<span class=\"_ _2\"></span>ified interconnector revenues are above<span class=\"_ _2\"></span>/below the by the opera<span class=\"_ _2\"></span>tor. Within-period adjustments will let operato<span class=\"_ _e\"></span>rs recover cap/floor) revenue dur<span class=\"_ _2\"></span>ing the assessment period if revenue is below<span class=\"_ _e\"></span> the floor (or above the cap), bu<span class=\"_ _2\"></span>t will still be subject to true-<span class=\"_ _e\"></span>up at the end of the five-year asse<span class=\"_ _2\"></span>ssment period.<span class=\"_ _e\"></span> Mechan<span class=\"_ _2\"></span>ism<span class=\"_ _e\"></span> If revenue is b<span class=\"_ _2\"></span>etween the cap and floor at the end of the 5<span class=\"_ _e\"></span>-year period, no adjustment <span class=\"_ _2\"></span>is required. Revenue above the cap is retu<span class=\"_ _e\"></span>rned to end<span class=\"_ _2\"></span> customer<span class=\"_ _2\"></span>s and any shortfall <span class=\"ls1c\">in</span> revenue below the floor requires payment from grid users (<span class=\"_ _2\"></span>via grid charges).<span class=\"_ _e\"></span> INFORMATION ABOUT THE PARENT COMPAN<span class=\"_ _2\"></span>Y<span class=\"_ _e\"></span> Extracts from the<span class=\"_ _2\"></span> statutory annual accounts of Elia Gro<span class=\"_ _e\"></span>up SA/NV<span class=\"_ _e\"></span>, drawn u<span class=\"_ _2\"></span>p in accordance with Belgian accounting standards, are provided hereafter in abbre<span class=\"_ _2\"></span>viated form.<span class=\"_ _e\"></span> Pursuant to Belgian<span class=\"_ _2\"></span> company legislation, the full financial statements, the annual report and the joint <span class=\"_ _e\"></span>auditors' repor<span class=\"_ _e\"></span>t are f<span class=\"_ _2\"></span>iled with the National Bank of Belgium. These documents will also<span class=\"_ _2\"></span> be published on the Elia websi<span class=\"_ _e\"></span>te <span class=\"fc23\"> </span>and can be obtained <span class=\"ls78\">up</span>o<span class=\"_ _2\"></span>n request from Elia Group SA/NV, Boulevard de l\u2019Empereur 20, <span class=\"_ _2\"></span>1000 Brussels, Belgium. The joint auditors issued a<span class=\"ff3f\">n <span class=\"_ _e\"></span>unqualified opinion. </span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.State<span class=\"_ _e\"></span>ment o<span class=\"_ _2\"></span>f financial position after distribution of pr<span class=\"_ _2\"></span>ofitsASSETS (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>FIXED ASSETS 3,825.2  3,318.1  Financial f<span class=\"_ _2\"></span>ixed assets 3,825.2  3,318.1  Affiliated companies 3,825.2  3,318.1  Participating in<span class=\"_ _2\"></span>terests 3,825.2  3,318.1  Other f<span class=\"_ _2\"></span>inancial assets<span class=\"_ _e\"></span> 0.0  0.0  CURRENT ASSETS 161.0  47.1  Inventories and contracts in<span class=\"_ _2\"></span> progress<span class=\"_ _e\"></span> 3.2  3.1  Contracts <span class=\"_ _2\"></span>in progress<span class=\"_ _e\"></span> 3.2  3.1  Amounts receivable<span class=\"_ _2\"></span> within one year<span class=\"_ _e\"></span> 5.4  2.2  Trade deb<span class=\"_ _2\"></span>tors<span class=\"_ _e\"></span> 5.4  1.7  Other amounts re<span class=\"_ _2\"></span>ceivable<span class=\"_ _e\"></span> 0.0  0.5  Own share<span class=\"_ _2\"></span>s 1.8  0.8  Cash at bank and in hand 147.3  37.2  Deferred charges and a<span class=\"_ _2\"></span>ccrued income<span class=\"_ _e\"></span> 3.3  3.8  TOTAL ASSETS 3,986.2  3,365.2  ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfNotesAndOtherExplanatoryInformationExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__16-1": {
   "value": "1.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Reporting entity </span>The registered o<span class=\"_ _2\"></span>ffice of Elia Group <span class=\"ls27\">SA</span>/NV (hereafter referred to as the <span class=\"ff42\">\u201c</span>Company<span class=\"ff42\">\u201d or \u201cElia\u201d</span>) is established in Belgium and located at 20 Boulevard de l\u2019Empereur<span class=\"ff3f\">, 1000 Brussels. Elia Group SA/NV is a public limited company, whose shares are listed on Euronext Brussels, </span>under<span class=\"_ _2\"></span> the symbol ELI.<span class=\"_ _e\"></span> The consolidated financial statements for the financial year 2022 include tho<span class=\"_ _2\"></span>se of Elia Group SA/NV<span class=\"_ _e\"></span> and its subsidiaries (collectively referred to as <span class=\"ff42\">\u2018</span>the Group' or 'Elia group') and the group's interests in joint ventures and associates<span class=\"fs11\">.</span> The Elia group compr<span class=\"_ _2\"></span>ises two electricity transmission syst<span class=\"_ _e\"></span>em operators (TSOs): Elia Transmission Belgium SA/NV in Belgium and 50Hertz Tran<span class=\"_ _2\"></span>smission GmbH<span class=\"ls1d\">, </span>in which the Elia group hol<span class=\"_ _e\"></span>ds an 80% stake. 50Hertz Transmission GmbH is <span class=\"ff42\">one of Germany\u2019s four </span>transmission system<span class=\"_ _2\"></span> operators; it operates in the north and east of the country.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> also has a 50% stake in Nemo Link Ltd, which <span class=\"_ _e\"></span>constructed an electrical interconnector between the UK and Belgium:<span class=\"_ _e\"></span> the Nemo Link <span class=\"_ _2\"></span>interconnector. Nemo Link <span class=\"_ _e\"></span>Ltd is a joint venture between Elia Transmission Belgium SA/NV and National Grid Ventures (in the UK)<span class=\"ls1d\">. It </span>began its commercial operations on <span class=\"ls5b\">30 </span>J<span class=\"_ _e\"></span>anuary 2019, with a transfer capacity of 1000 MW. With around 2,750 employe<span class=\"_ _2\"></span>es and a transmission system<span class=\"_ _e\"></span> that comprises some 19,126 km of high-voltage connections and serves 30<span class=\"ls0\"> million end consumers, the Elia g<span class=\"ff42\">roup is one of Europe\u2019s top five TSOs. It efficiently, reliably and securely </span>trans<span class=\"_ _e\"></span>ports electricity from </span>generators <span class=\"_ _2\"></span>to distribution system operators and major ind<span class=\"_ _e\"></span>ustrial con<span class=\"_ _2\"></span>sumers, while also importing and exporting electricity fr<span class=\"_ _e\"></span>om and to neighbouring<span class=\"_ _2\"></span> countries. The g<span class=\"_ _e\"></span>roup is a driving force beh<span class=\"_ _2\"></span>in<span class=\"_ _e\"></span>d the development of the European electricity market and the integration of energ<span class=\"_ _2\"></span>y generated from renewable sources. In addition to its <span class=\"_ _e\"></span>transmission activities in Belgium and Germany, the Elia group offers businesses a range o<span class=\"_ _2\"></span>f consultancy and engineering servi<span class=\"_ _e\"></span>ces. Through Elia a<span class=\"_ _2\"></span>nd 50Hertz, Elia Grou<span class=\"ff42\">p\u2019s mission is to <span class=\"_ _e\"></span>realise the climate ambitions of the European Green Deal. </span>Over the next few years, large-<span class=\"_ _2\"></span>scale investments in renewable energy prod<span class=\"_ _e\"></span>uction and the<span class=\"_ _2\"></span> offshore grid are due to be undertaken. To make a fundamental contribu<span class=\"_ _2\"></span>tion to the accelerated development of offshore e<span class=\"_ _e\"></span>nergy, in 2022 Elia Group created a new subsidiary: Wind<span class=\"_ _e\"></span>Grid. We refer to note 6.1 where further<span class=\"_ _2\"></span> information is provided on the inve<span class=\"_ _e\"></span>stment p<span class=\"_ _2\"></span>lan<span class=\"_ _e\"></span><span class=\"ls1d\">. </span> The group<span class=\"_ _2\"></span> operates under the legal entity Elia Group SA<span class=\"_ _e\"></span>/NV<span class=\"ls1d\">, </span>which is a listed company whose reference shareholder is municipal holding compan<span class=\"_ _2\"></span>y Publi-T <span class=\"ls27\">SC</span>. Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.8.5. <span class=\"_ _87\"> </span>Miscellaneous  Impact of the<span class=\"_ _2\"></span> United Kingdom leaving the European Unio<span class=\"_ _e\"></span>n On 30 December 2020, the Euro<span class=\"_ _2\"></span>pean Union and the UK signed a Trade and Cooperation Agreement that <span class=\"_ _e\"></span>outlines the terms of future cooperation between both<span class=\"_ _2\"></span> parties after 1 January 2021 (t<span class=\"_ _e\"></span>he official date on which the UK left the EU)<span class=\"ls1d\">. </span>According to this agreement, the UK left <span class=\"ls1d\">th</span>e Internal Energy Market (IEM)<span class=\"_ _2\"></span>.<span class=\"_ _e\"></span> Two year<span class=\"_ _2\"></span>s after Brexit, no impacts on the business of Ne<span class=\"_ _e\"></span>mo Link Ltd. h<span class=\"_ _2\"></span>ad been felt;<span class=\"_ _e\"></span> Nemo Link remained in operation as before<span class=\"ls1d\">. </span>The profitab<span class=\"_ _2\"></span>ility of the investment was also largely unaffected <span class=\"_ _e\"></span>due to the cap and floor mechanism (see Note 9.3), which provides certainty regarding t<span class=\"_ _2\"></span>he company\u2019s cash flows over a 25<span class=\"ff3f\">-ye<span class=\"_ _e\"></span>ar time period. There are no import duties on the transport of electricity. </span>Other than t<span class=\"_ _2\"></span>he risk identified above, Brexit <span class=\"ls5b\">ha<span class=\"_ _e\"></span></span>d a very limited effect on the consolidated financial statements. The impact of the war in Ukr<span class=\"_ _2\"></span>aine<span class=\"_ _e\"></span> Given the nature and location of <span class=\"_ _2\"></span>its operations and the fact that Elia Group does not currently have activities in Russia nor in Uk<span class=\"_ _e\"></span>raine or with Russian companie<span class=\"_ _2\"></span>s, Elia Group does not observe a direct impact of the Ukrainian conflict on its business. However, there <span class=\"_ _e\"></span>is a strong push a<span class=\"_ _2\"></span>t the European level to become less dependent from Russian gas and fossil fuels. Accordingly, the Group observes <span class=\"_ _e\"></span><span class=\"ls5b\">a </span>willingness among the au<span class=\"_ _2\"></span>thorities in Belgium and Germany to accelerate the energy transition and the related investment plans<span class=\"_ _e\"></span>. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGeneralInformationAboutFinancialStatementsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__5": {
   "value": "Elia Group SA/NV",
   "dimensions": {
    "concept": "ifrs-full:NameOfReportingEntityOrOtherMeansOfIdentification",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__11": {
   "value": "Belgium",
   "dimensions": {
    "concept": "ifrs-full:PrincipalPlaceOfBusiness",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__6": {
   "value": "Belgium",
   "dimensions": {
    "concept": "ifrs-full:CountryOfIncorporation",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__8": {
   "value": "20 Boulevard de l\u2019Empereur, 1000 Brussels",
   "dimensions": {
    "concept": "ifrs-full:DomicileOfEntity",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__7": {
   "value": "20 Boulevard de l\u2019Empereur, 1000 Brussels",
   "dimensions": {
    "concept": "ifrs-full:AddressOfRegisteredOfficeOfEntity",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__9": {
   "value": "public limited company",
   "dimensions": {
    "concept": "ifrs-full:LegalFormOfEntity",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__10": {
   "value": "It efficiently, reliably and securely transports electricity from generators to distribution system operators and major industrial consumers, while also importing and exporting electricity from and to neighbouring countries. The group is a driving force behind the development of the European electricity market and the integration of energy generated from renewable sources. In addition to its transmission activities in Belgium and Germany, the Elia group offers businesses a range of consultancy and engineering services.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfNatureOfEntitysOperationsAndPrincipalActivities",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__18": {
   "value": "Publi-T SC",
   "dimensions": {
    "concept": "ifrs-full:NameOfUltimateParentOfGroup",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__17": {
   "value": "Publi-T SC",
   "dimensions": {
    "concept": "ifrs-full:NameOfParentEntity",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__19-1": {
   "value": "2.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Basis of prepara<span class=\"_ _2\"></span>tion</span>2.1. <span class=\"_ _87\"> </span>Statement of compliance These <span class=\"_ _2\"></span>consolidated financial statements were <span class=\"_ _e\"></span>prepared in accordance with the International Financial Reporting Standards (IFRS), which have been adopted by the European Union. In doing so, the group applied all new and revised standards and interpretations publ<span class=\"ls0\">ished by the International Accounting Standards Board (IASB), including those which came into effect f<span class=\"_ _e\"></span>or the financial year starting </span>on 1 Januar<span class=\"_ _2\"></span>y 2022, which are applicable to the g<span class=\"ff42\">rou<span class=\"_ _e\"></span>p\u2019s activities</span>. New and <span class=\"_ _e\"></span>amended sta<span class=\"_ _2\"></span>ndards and interpretations The standards, amendments<span class=\"_ _2\"></span> and interpretations listed bel<span class=\"_ _e\"></span>ow came into effect in 2022<span class=\"ls1d\">, </span>with little or limited impact on the group:<span class=\"ff45\"> </span>\u2022<span class=\"ff3f\"> <span class=\"_ _62\"> </span><span class=\"fc3\">Ame<span class=\"_ _2\"></span>ndment to IFRS 16 Leases: COVID-<span class=\"ls5b\">19</span>-Related Rent C<span class=\"_ _e\"></span>oncessions beyond<span class=\"_ _2\"></span> 30 June 2021 (applicable for annual periods </span></span>beginnin<span class=\"_ _2\"></span>g on or after 1 April 2021);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _62\"> </span><span class=\"fc3\">Ame<span class=\"_ _2\"></span>ndments to IAS 37 Provisions, Contingent Lia<span class=\"_ _2\"></span>bilities and Contingent Assets; Onerous Contracts <span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span> Cost of Fulfilling a </span></span>Contract (app<span class=\"_ _2\"></span>licable for annual periods beginning on or after 1 January 2022);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _62\"> </span><span class=\"fc3\">Ame<span class=\"_ _2\"></span>ndments to IAS 16 Property, Plant and Equipment: Proceeds before Intended Use (applicable for annual per<span class=\"_ _2\"></span>io<span class=\"_ _e\"></span>ds </span></span>beginnin<span class=\"_ _2\"></span>g on or after 1 January 2022);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _62\"> </span><span class=\"fc3\">Ame<span class=\"_ _2\"></span>ndments to IFRS 3 Business <span class=\"_ _2\"></span>Combinations: Reference to the Conceptual Framework (applicable for annual periods </span></span>beginnin<span class=\"_ _2\"></span>g on or after 1 Janua<span class=\"_ _e\"></span>ry 2022); \u2022<span class=\"ff3f\"> <span class=\"_ _62\"> </span><span class=\"fc3\">Ann<span class=\"_ _2\"></span>ual Improvements to IFRS Standard<span class=\"_ _2\"></span>s 2018<span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span>2020 (applicable for annual periods beginn<span class=\"_ _2\"></span>ing on or after 1 January 2022).<span class=\"_ _20\"></span> </span></span>The <span class=\"ff40\">standards<span class=\"_ _2\"></span>, amendments and interpretations <span class=\"ff3f\">listed<span class=\"_ _e\"></span> below did not ta<span class=\"_ _2\"></span>ke effec<span class=\"_ _e\"></span>t in 2022. The changes <span class=\"ls1d\">to</span> the standards, amendments </span></span>and interpretation<span class=\"_ _2\"></span>s listed below are not expecte<span class=\"_ _e\"></span>d to have a material impact on these annual accounts and are therefore not outlined in any great de<span class=\"_ _2\"></span>tail:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">IFRS 17<span class=\"_ _2\"></span>: Insurance Contracts (applicable for annual periods beginning on or <span class=\"_ _e\"></span>after 1 January 2023);<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Amendm<span class=\"_ _2\"></span>ents to IFRS 17 Insurance contracts: Initial Application of IFRS 17 and IFRS 9 <span class=\"ff42\">\u2013</span> Comparative Information <span class=\"_ _e\"></span>(applicable for </span></span>annual period<span class=\"_ _2\"></span>s beginning on or after 1 January 2023);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Amendm<span class=\"_ _2\"></span>ents to IAS 1 Presentation of Financial Statemen<span class=\"_ _e\"></span>ts: Classification of liabilities as Curre<span class=\"_ _2\"></span>nt or Non-cu<span class=\"_ _e\"></span>rrent (applicable for </span></span>annual period<span class=\"_ _2\"></span>s beginning on or after 1 January 2024, but not yet endorsed in the EU);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Amendm<span class=\"_ _2\"></span>ents to IAS 1 Presentation of Financial Statements and IFRS Practice Statement 2: Disclosur<span class=\"_ _e\"></span>e of Accounting Policies </span></span>(applicab<span class=\"_ _2\"></span>le for annual periods beginning on or after 1 J<span class=\"_ _e\"></span>anuary 2023); \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Amendm<span class=\"_ _2\"></span>ents to IAS 8 Accounting Policies, Changes in Accounting Estimates and Err<span class=\"_ _2\"></span>ors (applicable for annual periods beginning </span></span>on or after<span class=\"_ _2\"></span> 1 January 2023);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3 ls27\">Am<span class=\"ls0\">e<span class=\"_ _2\"></span>ndments to IAS 12 Income Ta<span class=\"_ _2\"></span>xes: Deferred Tax related to Assets and Liabilities arising from a Single Transaction (applicable<span class=\"_ _e\"></span> </span></span></span>for annual period<span class=\"_ _2\"></span>s beginning on or after 1 January 2023);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Amendm<span class=\"_ _2\"></span>ents to IFRS 16 Leases: Lease Liability in a Sale and Leaseback (ap<span class=\"_ _e\"></span>plicable for annual periods beginning on or after 1 </span></span>Januar<span class=\"_ _2\"></span>y 2024, but not yet endorsed in the EU). 2.2. <span class=\"_ _87\"> </span>Functional and presentation currency These <span class=\"_ _2\"></span>consolidated financial statements are presented in million<span class=\"_ _e\"></span>s of euro, rounded to the nearest hundred thousand, unless stated otherwise. 2.3. <span class=\"_ _87\"> </span>Basis of measurement In general, t<span class=\"_ _2\"></span><span class=\"ls78\">he<span class=\"ls0\">se consolidated financial sta<span class=\"_ _2\"></span>tements were prepared on a historical cost basis. However, <span class=\"_ _e\"></span>reporting related to the following </span></span>categor<span class=\"_ _2\"></span>ies deviate from this general rule:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Equity acco<span class=\"_ _2\"></span>unted investees: the equity method was applied to determine the value of a shareholding over w<span class=\"_ _e\"></span>hich the group has a </span></span>significant influence; \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Other<span class=\"_ _2\"></span> shareholdings: entities in which the group has a shareholding but over which it does not have a significant in<span class=\"_ _e\"></span>fluence were </span></span>valued at fair va<span class=\"_ _2\"></span>lue through other comprehensive income (OCI);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Curr<span class=\"_ _2\"></span>ent and non-current receivables were valued at the lo<span class=\"_ _e\"></span>west of the carr<span class=\"_ _2\"></span>ying am<span class=\"_ _e\"></span>ount and the recoverable amount;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Employee<span class=\"_ _2\"></span> benefits were valued at the present value of the defined benefit obligations<span class=\"ls1d\">, </span>minus the fair value of the pl<span class=\"_ _e\"></span>an assets (see </span></span>also Note 6<span class=\"_ _2\"></span>.14); \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Derivative<span class=\"_ _2\"></span> financial instruments <span class=\"ls1c\">we<span class=\"ls8f\">re</span></span> meas<span class=\"_ _e\"></span>ured at fair value through OCI or profit and loss (<span class=\"ls27\">P&amp;L</span>), depend<span class=\"_ _2\"></span>ing on wh<span class=\"_ _e\"></span>ether the </span></span>derivative can be designated<span class=\"_ _2\"></span> as <span class=\"ls5b\">a </span>h<span class=\"_ _e\"></span>edging instrument (see also Note 8.1); \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Decomm<span class=\"_ _2\"></span>issioning provisions were valued at present value. </span></span>2.4. <span class=\"_ _87\"> </span>Going concern The d<span class=\"_ _2\"></span>irectors reassessed the going concern assumption <span class=\"_ _e\"></span>of the Company and, at the time of approving the financial statements, held <span class=\"ls5b\">a </span>reasonable expectation tha<span class=\"_ _2\"></span>t the group had ade<span class=\"_ _e\"></span>quate resources to<span class=\"_ _2\"></span> continue in operational existence for the foreseeab<span class=\"_ _e\"></span>le future. The director<span class=\"_ _2\"></span>s will therefore continue to adopt the going concern basis of accounting in t<span class=\"_ _e\"></span>he preparation of the financial statements.<span class=\"_ _e\"></span> In the current con<span class=\"_ _2\"></span>text of inflation (energy crisis) and volatil<span class=\"_ _e\"></span>e market cond<span class=\"_ _2\"></span>itions, th<span class=\"_ _e\"></span>e group paid particular attention to <span class=\"_ _e\"></span>adequately reflecting<span class=\"_ _2\"></span> the current and expected impact of the situation on the financial <span class=\"_ _e\"></span>position, performance and cash flows of the company, applying t<span class=\"_ _2\"></span>he IFRS accounting principles in a consistent manner. In general, <span class=\"_ _e\"></span>since Elia Group is acting in accordance with the regulatory frameworks in Belgium and Germany, the profitab<span class=\"_ _2\"></span>ility and the fina<span class=\"_ _e\"></span>ncial position of the group have not been affected.  2.5. <span class=\"_ _87\"> </span>Use of estimates and judgements The preparation of these con<span class=\"_ _2\"></span>solidated financial statements in accordance with IFRS requires management to make judgements, estimates and a<span class=\"_ _2\"></span>ssumptions that could affect the reported amounts of assets and liabilities and revenue and expenses. The estimat<span class=\"_ _e\"></span>es and underlying assumptions are based on historical experience and various other fa<span class=\"_ _2\"></span>ctors that are believed to be rea<span class=\"_ _20\"></span>son<span class=\"_ _2\"></span>able under the circumstan<span class=\"_ _2\"></span>ces: the results of these estimates and assum<span class=\"_ _e\"></span>ptions form the basis for making judgements regarding the carr<span class=\"_ _2\"></span>ying amounts of assets and liabilities. Actual results could therefore differ from these e<span class=\"_ _2\"></span>stimates. The estimates and underlying assumptions are reviewed on an ongoing basis.<span class=\"_ _2\"></span> Revisions to accounting estimates are recognised either: in the period d<span class=\"_ _e\"></span>uring which the estimate is revised if th<span class=\"ls78\">e </span>revision on<span class=\"_ _2\"></span>ly affects this period; or in the period d<span class=\"_ _e\"></span>uring which the estimate is revised and throughout future periods if the revision affects both curren<span class=\"_ _2\"></span>t and future periods.<span class=\"_ _e\"></span> The fo<span class=\"_ _2\"></span>llowing points include information about significant <span class=\"_ _e\"></span>areas of estimation uncertainty and critical judgements in applying accounting policies that have the m<span class=\"_ _2\"></span>ost significant effect on the amounts recognised in the consolidated financial statements:<span class=\"_ _20\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> total allowed remuneration for the g<span class=\"ff42\">roup\u2019s </span>role as TSO <span class=\"ls1c\">in</span> the Belgian and German segments <span class=\"ls1c\">is</span> mainly determined by </span></span>calculation methods set b<span class=\"_ _2\"></span>y the Belgian federal regulator (<span class=\"_ _e\"></span>the Commission for Electricity and Gas Regulation or CRE<span class=\"_ _e\"></span>G) and the German federal regula<span class=\"_ _2\"></span>tor (the Federal Network Agency or<span class=\"_ _e\"></span> BNetzA) respectively<span class=\"ls95\">. <span class=\"_ _2\"></span><span class=\"ls0\">The recognition of deferral regulatory accounts is </span></span>also based on the differen<span class=\"_ _2\"></span>t regulatory schemes. F<span class=\"_ _e\"></span>or certain calculations, a level of professional judgement needs to be applied<span class=\"ls1d\">. </span>More d<span class=\"_ _2\"></span>isclosures are provided in Notes 6.2<span class=\"_ _e\"></span>0, 9.1.4 and 9.2.3. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Entities in which t<span class=\"_ _2\"></span>he group holds less than 20% of the voting rights but has significant influence a<span class=\"_ _e\"></span>re accounted for under the equity </span></span>method. Fo<span class=\"_ _2\"></span>llowing the guidance in IAS 28, the group ass<span class=\"_ _e\"></span>esses whether it has significant influence over its asso<span class=\"_ _2\"></span>ciat<span class=\"_ _e\"></span>es and therefore needs to account for them under the equity method (<span class=\"_ _2\"></span>rather than applying IFRS 9) and reassesses this i<span class=\"_ _e\"></span>n each reporting period (see a<span class=\"_ _2\"></span>lso Note <span class=\"ls5b\">6.<span class=\"_ _e\"></span>5)</span>.  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Defer<span class=\"_ _2\"></span>red tax assets are recognised for the carry-forward of unused tax losses and unused tax credits i<span class=\"_ _e\"></span>n so far as it is probable </span></span>that future taxable<span class=\"_ _2\"></span> profit will be available against which the unused tax losses and unused tax credits can be utilise<span class=\"_ _e\"></span>d. In making a judgement on this, management takes into account e<span class=\"_ _2\"></span>lem<span class=\"_ _e\"></span>ents such as long-term business strategy and tax planning opportunities (see Note 6.7).  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Credit <span class=\"_ _2\"></span>risk related to customers: management closely reviews the outstanding trade receivables, including by considering ageing, </span></span>paymen<span class=\"_ _2\"></span>t history and credit risk coverage (see Note 8.1<span class=\"_ _e\"></span>). \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Employee <span class=\"_ _2\"></span>benefits including reimbursement rights <span class=\"ff42\">\u2013</span> see <span class=\"_ _e\"></span>Note 6.<span class=\"ls5b\">14</span>: </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">The group <span class=\"_ _2\"></span>has d<span class=\"_ _2\"></span>efined benefit <span class=\"_ _2\"></span>plans and <span class=\"_ _2\"></span>defined contribution p<span class=\"_ _2\"></span>lans which a<span class=\"_ _2\"></span>re disclosed <span class=\"_ _2\"></span>in <span class=\"_ _2\"></span>Note 6.15. The ca<span class=\"_ _2\"></span>lculatio<span class=\"_ _e\"></span>n o<span class=\"_ _2\"></span>f <span class=\"_ _2\"></span>the<span class=\"_ _e\"></span> </span></span>liabilities <span class=\"_ _2\"></span>or asse<span class=\"_ _2\"></span>ts related <span class=\"_ _2\"></span>to the<span class=\"_ _2\"></span>se plans is <span class=\"_ _4b\"></span>bas<span class=\"_ _e\"></span>ed <span class=\"_ _2\"></span>on actuarial a<span class=\"_ _2\"></span>nd statistical <span class=\"_ _2\"></span>assumptions. For example, th<span class=\"_ _2\"></span>is is th<span class=\"_ _2\"></span>e case <span class=\"_ _4b\"></span>for<span class=\"_ _e\"></span> the present val<span class=\"_ _e\"></span>ue of f<span class=\"_ _e\"></span>uture <span class=\"_ _e\"></span>pension liabilities. <span class=\"_ _e\"></span>The p<span class=\"_ _e\"></span>resent <span class=\"_ _e\"></span>value is, <span class=\"_ _e\"></span>among o<span class=\"_ _e\"></span>ther facto<span class=\"_ _e\"></span>rs, impacted by <span class=\"_ _e\"></span>c<span class=\"_ _e\"></span>hanges in<span class=\"_ _20\"></span> discount rates, <span class=\"_ _4b\"></span>and <span class=\"_ _2\"></span>financial <span class=\"_ _2\"></span>assumptions <span class=\"_ _4b\"></span>such a<span class=\"_ _2\"></span>s fu<span class=\"_ _2\"></span>ture <span class=\"_ _4b\"></span>inc<span class=\"_ _e\"></span>reases <span class=\"_ _2\"></span>in <span class=\"_ _4b\"></span>salary. <span class=\"_ _2\"></span>In <span class=\"_ _2\"></span>addition<span class=\"_ _2\"></span>, <span class=\"_ _2\"></span>demographic <span class=\"_ _2\"></span>assumptions, <span class=\"_ _4b\"></span>such <span class=\"_ _2\"></span>as <span class=\"_ _2\"></span>average<span class=\"_ _e\"></span> assumed<span class=\"_ _2\"></span> retirement age, also affect the present value of f<span class=\"_ _e\"></span>uture pension liabilities. o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">In <span class=\"_ _20\"></span>determining <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>appropriate <span class=\"_ _5d\"></span>discount <span class=\"_ _20\"></span>rate, <span class=\"_ _20\"></span>management <span class=\"_ _20\"></span>considers <span class=\"_ _20\"></span>th<span class=\"_ _e\"></span>e <span class=\"_ _20\"></span>interest <span class=\"_ _20\"></span>rates <span class=\"_ _20\"></span>of <span class=\"_ _5d\"></span>corporate<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>b<span class=\"_ _e\"></span>onds <span class=\"_ _20\"></span>in <span class=\"_ _20\"></span>currencies<span class=\"_ _e\"></span> </span></span>consistent with <span class=\"_ _e\"></span>cur<span class=\"_ _e\"></span>rencies of <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>post-employment <span class=\"_ _e\"></span>benefi<span class=\"_ _e\"></span>t <span class=\"_ _e\"></span>obligation, i.e. <span class=\"_ _e\"></span>e<span class=\"_ _e\"></span>uro, <span class=\"_ _e\"></span>with <span class=\"_ _e\"></span>at <span class=\"_ _e\"></span>least <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>n <span class=\"_ _e\"></span>AA<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>rating <span class=\"_ _e\"></span>or <span class=\"_ _e\"></span>above, <span class=\"_ _20\"></span>as set by <span class=\"_ _e\"></span>at <span class=\"_ _e\"></span>least <span class=\"_ _20\"></span><span class=\"ls5b\">one <span class=\"_ _e\"></span></span>le<span class=\"_ _e\"></span>ading <span class=\"_ _e\"></span>rating <span class=\"_ _20\"></span>agen<span class=\"_ _2\"></span>cy <span class=\"_ _20\"></span>and<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>extra<span class=\"_ _2\"></span>polated <span class=\"_ _20\"></span>along <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>yield <span class=\"_ _20\"></span>curve <span class=\"_ _e\"></span>to <span class=\"_ _e\"></span>correspond <span class=\"_ _e\"></span>wit<span class=\"_ _e\"></span>h <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>expected ter<span class=\"_ _e\"></span>m <span class=\"_ _20\"></span>of the defined bene<span class=\"_ _2\"></span>fit obligation. Higher and lower yielding bonds are excluded in developing the appropriate yield curve<span class=\"_ _e\"></span>.  o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Each <span class=\"_ _e\"></span>plan's<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>proj<span class=\"_ _e\"></span>ected <span class=\"_ _e\"></span>cash<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>flow<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>is m<span class=\"_ _e\"></span>atched <span class=\"_ _e\"></span>to<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>th<span class=\"_ _e\"></span>e <span class=\"_ _e\"></span>spot <span class=\"_ _20\"></span>rates <span class=\"_ _e\"></span>o<span class=\"_ _e\"></span>f <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>he <span class=\"_ _20\"></span>yield <span class=\"_ _e\"></span>cu<span class=\"_ _e\"></span>rve <span class=\"_ _e\"></span>to<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>calculate <span class=\"_ _20\"></span>an <span class=\"_ _e\"></span>associated <span class=\"_ _20\"></span>present <span class=\"_ _e\"></span>value.<span class=\"_ _e\"></span> </span></span>A single <span class=\"_ _20\"></span>equivalent <span class=\"_ _20\"></span>discount <span class=\"_ _20\"></span>rate <span class=\"_ _20\"></span>is <span class=\"_ _20\"></span>then <span class=\"_ _20\"></span>determined <span class=\"_ _20\"></span>that <span class=\"_ _5d\"></span>produ<span class=\"_ _2\"></span>ces <span class=\"_ _20\"></span>that <span class=\"_ _20\"></span>same <span class=\"_ _20\"></span>present <span class=\"_ _20\"></span>valu<span class=\"_ _e\"></span>e. <span class=\"_ _5d\"></span>The <span class=\"_ _20\"></span>resulting <span class=\"_ _20\"></span>discount<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>rate therefore reflects both the curren<span class=\"_ _2\"></span>t interest rate environme<span class=\"_ _e\"></span>nt and the plan's distinct liability characteristics. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Provisions fo<span class=\"_ _2\"></span>r environmental remediation costs: at each y<span class=\"_ _e\"></span>ear-end, an estimate is made regarding future expenses with respect <span class=\"ls1d\">to</span> </span></span>soil remediation, based<span class=\"_ _2\"></span> on the exp<span class=\"_ _e\"></span>ert advice. The extent of remediation costs is dependent on a lim<span class=\"_ _2\"></span>ited number of uncertainties, including <span class=\"ls5b\">new</span>ly identified cases of soil contamination (see<span class=\"_ _e\"></span> Note 6.1<span class=\"ls5b\">5)</span>. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Other<span class=\"_ _2\"></span> provisions are based on the value of the claims filed or on the estimated amount of the risk exposure. The expected timing </span></span>of the relate<span class=\"_ _2\"></span>d cash outflow depends on the progress and <span class=\"_ _e\"></span>duration of the asso<span class=\"_ _2\"></span>ciated process/procedures (<span class=\"_ _e\"></span>see Note <span class=\"_ _e\"></span>6.1<span class=\"ls5b\">5)</span>. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In de<span class=\"_ _2\"></span>termining the appropriate discount rate to discount the future dismantling obligation, management c<span class=\"_ _e\"></span>onsiders the interest </span></span>rates o<span class=\"_ _2\"></span>f corporate bonds in euro with at least an AA rating<span class=\"_ _e\"></span> or above as <span class=\"_ _2\"></span>set by at least one <span class=\"_ _e\"></span>leading rating agency and extrapolated along the yield curve t<span class=\"_ _2\"></span>o correspond with the expected term of the dismantling obligation. A sensitiv<span class=\"_ _e\"></span>ity analysis is performed to measure the<span class=\"_ _2\"></span> impact of a differing discou<span class=\"_ _e\"></span>nt rate.  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Good<span class=\"_ _2\"></span>will impairment testing: the group performs impairment tests on goodwill and on cash-ge<span class=\"_ _e\"></span>nerating units (CGUs) at the </span></span>repor<span class=\"_ _2\"></span>ting date, and whenever there are indications tha<span class=\"_ _e\"></span>t the carrying amount might be higher than the recoverable amount.<span class=\"_ _2\"></span> This analysis is based on<span class=\"_ _2\"></span> assumptions such as esti<span class=\"_ _e\"></span>mated investment plans, remuneration defined in the regulatory frameworks, market evolutio<span class=\"_ _2\"></span>n, market share, margin evolution and discount rates (s<span class=\"_ _e\"></span>ee Note <span class=\"ls5b\">6.</span>3).<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Fair<span class=\"_ _2\"></span> value measurement of financial instruments: when th<span class=\"_ _e\"></span>e fair va<span class=\"_ _2\"></span>lues of financial assets and financial liabilities recorded in the </span></span>statement of <span class=\"_ _2\"></span>financial position cannot be measured based on quoted prices in active markets, their fair valu<span class=\"_ _e\"></span>e is measured using valuation techniq<span class=\"_ _2\"></span>ues. The inputs fo<span class=\"_ _e\"></span>r these valuation techniques are taken from observable markets where possible. Where this is not fea<span class=\"_ _2\"></span>sible, a certain level of professional judgement is r<span class=\"_ _e\"></span>equired in establishing fair va<span class=\"_ _2\"></span>lues. Changes in t<span class=\"_ _e\"></span>he fair value of the derivative hedg<span class=\"_ _2\"></span>ing instrument designated as a cash flow hedge are recognised directly in OCI t<span class=\"_ _e\"></span>o the extent that the hedge is effective. If the hedge is ineffe<span class=\"_ _2\"></span>ctive, changes in fair value are recognised in profit or loss (see Note <span class=\"_ _e\"></span>6<span class=\"ls1d\">.1<span class=\"ls78\">8)</span></span>. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> useful life of the fixed assets is defined to reflect the r<span class=\"_ _e\"></span>eal depreciation of each asse<span class=\"_ _2\"></span>t. The depreciation of property, plant and </span></span>equipment is m<span class=\"_ _2\"></span>ainly calculated based on the useful lives <span class=\"_ _e\"></span>determined by the regulatory frameworks in Belgium and Germany, which are considered to be the be<span class=\"_ _2\"></span>st possible approximation of actual events in terms of economic utilisati<span class=\"_ _e\"></span>on. (see Note 3.3.1 and 6.1) \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> group makes use of practical expedients when applying IFRS 16 (Leasing): </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">The g<span class=\"_ _e\"></span>roup applies <span class=\"_ _e\"></span>a <span class=\"_ _e\"></span>single <span class=\"_ _e\"></span>discount r<span class=\"_ _e\"></span>ate p<span class=\"_ _e\"></span>er typ<span class=\"_ _e\"></span>e of <span class=\"_ _e\"></span>contracts, <span class=\"_ _e\"></span>summarised pe<span class=\"_ _e\"></span>r thei<span class=\"_ _e\"></span>r duration. <span class=\"_ _e\"></span>Those l<span class=\"_ _e\"></span>eases <span class=\"_ _e\"></span>are <span class=\"_ _e\"></span>as<span class=\"_ _e\"></span>sumed </span></span>to <span class=\"_ _e\"></span>have <span class=\"_ _20\"></span>similar <span class=\"_ _20\"></span>characteristics. <span class=\"_ _20\"></span>The <span class=\"_ _e\"></span>disc<span class=\"_ _e\"></span>ount <span class=\"_ _20\"></span>rate <span class=\"_ _20\"></span>used <span class=\"_ _e\"></span>is<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>g<span class=\"_ _e\"></span>roup's <span class=\"_ _20\"></span>best <span class=\"_ _e\"></span>estim<span class=\"_ _e\"></span>at<span class=\"_ _e\"></span>e <span class=\"_ _20\"></span>of <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>w<span class=\"_ _e\"></span>eighted <span class=\"_ _20\"></span>average <span class=\"_ _20\"></span>incremental borro<span class=\"_ _2\"></span>wing rate. Each lease contract is classified in a duration bucket (&lt;5 years, between 5 and 10 years, etc.) for which an interest <span class=\"_ _e\"></span>rate <span class=\"_ _e\"></span>is <span class=\"_ _20\"></span>derived e<span class=\"_ _e\"></span>qual <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>o <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>interest r<span class=\"_ _e\"></span>ate <span class=\"_ _e\"></span>of <span class=\"_ _20\"></span>a t<span class=\"_ _e\"></span>raded <span class=\"_ _e\"></span>bond <span class=\"_ _20\"></span>with t<span class=\"_ _e\"></span>he <span class=\"_ _e\"></span>sa<span class=\"_ _e\"></span>me <span class=\"_ _e\"></span>rating <span class=\"_ _20\"></span>as E<span class=\"_ _e\"></span>lia <span class=\"_ _e\"></span>Group <span class=\"_ _e\"></span>SA<span class=\"_ _e\"></span>/NV <span class=\"_ _e\"></span>in <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>same<span class=\"_ _e\"></span> sector with <span class=\"ls5b\">a </span>similar duration. The interest rate is fixed over the lifetime of the lease contract. o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">The g<span class=\"_ _e\"></span>roup assesses <span class=\"_ _e\"></span>the n<span class=\"_ _e\"></span>on-cancellable <span class=\"_ _e\"></span>period of <span class=\"_ _e\"></span>each <span class=\"_ _e\"></span>of <span class=\"_ _e\"></span>the contracts <span class=\"_ _20\"></span>falling within the <span class=\"_ _e\"></span>sc<span class=\"_ _e\"></span>ope of <span class=\"_ _e\"></span>IFRS 1<span class=\"_ _e\"></span>6. T<span class=\"_ _e\"></span>his includes<span class=\"_ _e\"></span> </span></span>the period <span class=\"_ _20\"></span>cover<span class=\"_ _2\"></span>ed <span class=\"_ _e\"></span>by <span class=\"_ _20\"></span>an option <span class=\"_ _20\"></span>to extend <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>leas<span class=\"_ _e\"></span>e, <span class=\"_ _e\"></span>if <span class=\"_ _e\"></span>th<span class=\"_ _e\"></span>e <span class=\"_ _e\"></span>lessee <span class=\"_ _e\"></span>is <span class=\"_ _20\"></span>rea<span class=\"_ _2\"></span>sonabl<span class=\"_ _e\"></span>y <span class=\"_ _e\"></span>certain <span class=\"_ _20\"></span>tha<span class=\"_ _2\"></span>t <span class=\"_ _e\"></span>they <span class=\"_ _20\"></span>will <span class=\"_ _e\"></span>exercise <span class=\"_ _e\"></span>that <span class=\"_ _e\"></span>option. Certainly, <span class=\"_ _4b\"></span>whe<span class=\"_ _e\"></span>re it <span class=\"_ _2\"></span>relates <span class=\"_ _2\"></span>to <span class=\"_ _2\"></span>office rent <span class=\"_ _2\"></span>contracts, th<span class=\"_ _2\"></span>e <span class=\"_ _2\"></span>group makes <span class=\"_ _2\"></span>its best<span class=\"_ _2\"></span> estimate o<span class=\"_ _2\"></span>f <span class=\"_ _2\"></span>the non-cancellable <span class=\"_ _4b\"></span>p<span class=\"_ _e\"></span>eriod based <span class=\"_ _2\"></span>on all information a<span class=\"_ _2\"></span>t its disposal (see Note 6.19).<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> impacts of the COVID-19 crisis and macroeconomic developments were taken into account by the group to assess potential </span></span>effects o<span class=\"ff42\">n Elia\u2019s financial performa<span class=\"_ _2\"></span>nce. <span class=\"ff3f\">In general, as Elia<span class=\"_ _e\"></span> is acting in accordance with regulatory frameworks in Belgium and </span></span>Germ<span class=\"ls5b\">an</span>y, its profitability was not significantly affected in 2021 or 2022. During these two years, the COVID pandemic did not significantly impact th<span class=\"_ _2\"></span>e group neither in terms of financial performance nor in terms of the execution of the <span class=\"_ _e\"></span>onshore and offshore infrastr<span class=\"_ _2\"></span>ucture projects in either Belgium <span class=\"ls5b\">or</span> <span class=\"_ _e\"></span>Germany. The only exception to this was, in 2021, Elia Grid International<span class=\"ff42\">\u2019s activities, </span>since the in<span class=\"_ _2\"></span>ternational consulting business was negatively<span class=\"_ _e\"></span> impacted by the COVID-<span class=\"ls5b\">19 <span class=\"_ _e\"></span></span>restrictions, leading to a drop in its revenues. Th<span class=\"_ _2\"></span>is situation was nevertheless offset by cost control measures in COVID times. Effects on macro-econo<span class=\"_ _e\"></span>mic metr<span class=\"_ _2\"></span>ics, such as the interest rate, d<span class=\"_ _2\"></span>iscount rate, etc. - w<span class=\"_ _e\"></span>ere taken into account. The year 2022 has been more im<span class=\"_ _2\"></span>pacted by the war in Uk<span class=\"_ _e\"></span>raine and its consequences on energy prices (inflation). Given the nature a<span class=\"_ _e\"></span>nd location <span class=\"_ _e\"></span>of its <span class=\"_ _e\"></span>operations <span class=\"_ _e\"></span>and the <span class=\"_ _e\"></span>fact <span class=\"_ _e\"></span>that Elia <span class=\"_ _e\"></span>Group does no<span class=\"_ _e\"></span>t currently <span class=\"_ _e\"></span>have activities <span class=\"_ _e\"></span>in Ru<span class=\"_ _e\"></span>ssia nor<span class=\"_ _20\"></span> in Ukraine <span class=\"_ _e\"></span>or with <span class=\"_ _20\"></span>Russian <span class=\"_ _e\"></span>companies, <span class=\"_ _20\"></span>Elia <span class=\"_ _20\"></span>Group <span class=\"_ _20\"></span>has <span class=\"_ _20\"></span>not <span class=\"_ _e\"></span>observed <span class=\"_ _20\"></span>a <span class=\"_ _20\"></span>di<span class=\"_ _e\"></span>rect <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>mpact <span class=\"_ _20\"></span>of <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>Uk<span class=\"_ _e\"></span>rainian <span class=\"_ _e\"></span>c<span class=\"_ _e\"></span>onflict <span class=\"_ _20\"></span>on <span class=\"_ _20\"></span>its <span class=\"_ _e\"></span>busin<span class=\"_ _e\"></span>ess. <span class=\"_ _20\"></span>However, <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>here <span class=\"_ _20\"></span>was <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span> strong push at the <span class=\"_ _e\"></span>European <span class=\"_ _e\"></span>level to beco<span class=\"_ _e\"></span>me less dep<span class=\"_ _e\"></span>endent from <span class=\"_ _e\"></span>Russian gas a<span class=\"_ _e\"></span>nd fossil fuels <span class=\"_ _e\"></span>with a <span class=\"_ _e\"></span>willingness <span class=\"_ _e\"></span>among the aut<span class=\"_ _20\"></span>horities in <span class=\"_ _20\"></span>Belgium <span class=\"_ _e\"></span>and <span class=\"_ _e\"></span>Ge<span class=\"_ _e\"></span>rmany <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>o <span class=\"_ _20\"></span>accelerate <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>energ<span class=\"ff42\">y <span class=\"_ _20\"></span>transition. <span class=\"_ _20\"></span>This <span class=\"_ _e\"></span>led <span class=\"_ _20\"></span>to <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>n <span class=\"_ _20\"></span>increa<span class=\"_ _2\"></span>se <span class=\"_ _20\"></span>of <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>Group\u2019s <span class=\"_ _20\"></span>investment <span class=\"_ _e\"></span>p<span class=\"_ _e\"></span>rogram <span class=\"_ _e\"></span>ov<span class=\"_ _e\"></span>er <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>mid<span class=\"ff3f\">-</span></span>term.  With <span class=\"_ _e\"></span>regard <span class=\"_ _20\"></span>to <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>increasing <span class=\"_ _e\"></span>inflation <span class=\"_ _20\"></span>rates, <span class=\"_ _20\"></span>this <span class=\"_ _e\"></span>is <span class=\"_ _20\"></span>a <span class=\"_ _e\"></span>m<span class=\"_ _e\"></span>atter <span class=\"_ _20\"></span>of co<span class=\"_ _e\"></span>ncern <span class=\"_ _e\"></span>fo<span class=\"_ _e\"></span>r <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>he <span class=\"_ _e\"></span>gro<span class=\"_ _e\"></span>up <span class=\"_ _e\"></span>even<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>if <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>t <span class=\"_ _20\"></span>operates <span class=\"_ _e\"></span>under<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>regulatory <span class=\"_ _20\"></span>framewor<span class=\"_ _2\"></span>k <span class=\"_ _20\"></span>to offset m<span class=\"_ _e\"></span>ajor <span class=\"_ _e\"></span>c<span class=\"_ _e\"></span>ost <span class=\"_ _e\"></span>increases<span class=\"ls95\">. <span class=\"_ _e\"></span></span>The <span class=\"_ _e\"></span>impacts <span class=\"_ _20\"></span>of <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>current <span class=\"_ _e\"></span>market <span class=\"_ _e\"></span>volatility <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>nd <span class=\"_ _e\"></span>macroeconomic <span class=\"_ _20\"></span>deve<span class=\"_ _2\"></span>lopments <span class=\"_ _20\"></span>were <span class=\"_ _e\"></span>taken <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>nto <span class=\"_ _e\"></span>account<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>by<span class=\"_ _e\"></span> the group to <span class=\"_ _e\"></span>assess <span class=\"_ _e\"></span>potential <span class=\"_ _e\"></span>effects <span class=\"_ _e\"></span>on Elia\u2019s <span class=\"_ _e\"></span>financial <span class=\"_ _e\"></span>performance <span class=\"_ _e\"></span>and the <span class=\"_ _e\"></span>valuation of i<span class=\"_ _e\"></span>ts <span class=\"_ _e\"></span>assets a<span class=\"_ _e\"></span>nd liabilities<span class=\"_ _e\"></span><span class=\"ff3f\"> <span class=\"_ _20\"></span>(see note <span class=\"_ _e\"></span>4.4, <span class=\"_ _e\"></span>5.2, 5.3, </span>6.15 an<span class=\"_ _2\"></span>d 6.17). In particular, key <span class=\"_ _2\"></span>assumptions used in the calculation of <span class=\"_ _2\"></span>the post employments obliga<span class=\"_ _2\"></span>tions have been reviewed to ensure a proper valuation as per 31 D<span class=\"_ _e\"></span>ecember 2022<span class=\"_ _e\"></span> (see note 6.<span class=\"_ _e\"></span>14)<span class=\"ls1d\">. </span>The group<span class=\"_ _e\"></span> assessed whether its non-<span class=\"_ _e\"></span>financial assets might be impai<span class=\"_ _e\"></span>red: it<span class=\"_ _e\"></span> carried<span class=\"_ _2\"></span> <span class=\"_ _5d\"></span>out <span class=\"_ _5d\"></span>a<span class=\"_ _e\"></span>n <span class=\"_ _5d\"></span>analysis <span class=\"_ _5d\"> </span>of <span class=\"_ _24d\"> </span>potential <span class=\"_ _5d\"></span>impairment <span class=\"_ _5d\"> </span>indicat<span class=\"_ _e\"></span>ors, <span class=\"_ _5d\"> </span>i<span class=\"_ _e\"></span>n <span class=\"_ _5d\"></span>accordance<span class=\"_ _2\"></span> <span class=\"_ _5d\"></span>with <span class=\"_ _24d\"> </span>the <span class=\"_ _5d\"></span>provisions <span class=\"_ _5d\"></span>of <span class=\"_ _5d\"></span>IAS<span class=\"_ _e\"></span> <span class=\"_ _5d\"></span>36 <span class=\"_ _24d\"> </span><span class=\"ff42\">\u2013</span> <span class=\"_ _5d\"> </span>Impairment <span class=\"_ _5d\"></span>of <span class=\"_ _24d\"> </span>Assets. <span class=\"_ _5d\"></span>The impairm<span class=\"_ _2\"></span>ent test was carried out based on the last busines<span class=\"_ _e\"></span>s plan; this identified no impairment risks as per 31 Dece<span class=\"_ _e\"></span>mber 2022. The <span class=\"_ _4b\"></span>different <span class=\"_ _2\"></span>crisis <span class=\"_ _2\"></span>and, <span class=\"_ _4b\"></span>in 2022, <span class=\"_ _4b\"></span>the<span class=\"_ _e\"></span> <span class=\"_ _2\"></span>strong <span class=\"_ _4b\"></span>increase o<span class=\"_ _2\"></span>f e<span class=\"_ _2\"></span>lectricity <span class=\"_ _2\"></span>prices <span class=\"_ _4b\"></span>could result <span class=\"_ _4b\"></span>in a <span class=\"_ _4b\"></span>po<span class=\"_ _e\"></span>tentially <span class=\"_ _4b\"></span>i<span class=\"_ _e\"></span>ncreased <span class=\"_ _4b\"></span>c<span class=\"_ _e\"></span>redit <span class=\"_ _2\"></span>risk <span class=\"_ _2\"></span>and <span class=\"_ _4b\"></span>may <span class=\"_ _2\"></span>therefore affect the am<span class=\"_ _2\"></span>ount of impairment losses to be recognised <span class=\"_ _e\"></span>with respect to expected credit losses. The group has since monitored payment receipts and counterpar<span class=\"_ _2\"></span>ty risk more closely, noting no significant deterioration. We refer<span class=\"_ _2\"></span> to the following notes for more information: 6.3, 6.9, 6.19 and 8.1. 2.6. <span class=\"_ _87\"> </span>Approval by the Board of Directors These consolida<span class=\"_ _2\"></span>ted financial statements were authorised for publication by the Board of Directors on <span class=\"_ _e\"></span><span class=\"ls5b\">30 </span>March 202<span class=\"_ _e\"></span>3.5.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Items in the con<span class=\"_ _e\"></span>solidated state<span class=\"_ _2\"></span>ment of profit or loss and other compr<span class=\"_ _2\"></span>ehensive </span>income There were<span class=\"_ _2\"></span> no changes made to the basis of preparation and therefore no restatements of figures from previous years were required.3.5 <span class=\"_ _235\"> </span>Statement<span class=\"_ _e\"></span> of comprehensive inc<span class=\"_ _2\"></span>ome and statement of changes in equity<span class=\"_ _e\"></span> The statement of <span class=\"_ _2\"></span>comprehensive income presents an overview of all revenues and expenses recognise<span class=\"_ _e\"></span>d in the consolidated statement of pro<span class=\"_ _2\"></span>fit or loss and in the consolidated statement of changes in equity. The gr<span class=\"_ _e\"></span>oup has elected to present comprehensive income using the two-<span class=\"_ _2\"></span>statement approach, i.e. the statement of profit or loss immediately followed by th<span class=\"_ _e\"></span>e statement of other comprehensive income. As a result o<span class=\"_ _2\"></span>f this approach, the content of the statement <span class=\"_ _e\"></span>of changes in equity is r<span class=\"_ _2\"></span>estricted to owner-<span class=\"_ _e\"></span>related changes.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBasisOfPreparationOfFinancialStatementsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__20": {
   "value": "2.1. <span class=\"_ _87\"> </span>Statement of compliance These <span class=\"_ _2\"></span>consolidated financial statements were <span class=\"_ _e\"></span>prepared in accordance with the International Financial Reporting Standards (IFRS), which have been adopted by the European Union. In doing so, the group applied all new and revised standards and interpretations publ<span class=\"ls0\">ished by the International Accounting Standards Board (IASB), including those which came into effect f<span class=\"_ _e\"></span>or the financial year starting </span>on 1 Januar<span class=\"_ _2\"></span>y 2022, which are applicable to the g<span class=\"ff42\">rou<span class=\"_ _e\"></span>p\u2019s activities</span>.",
   "dimensions": {
    "concept": "ifrs-full:StatementOfIFRSCompliance",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__21": {
   "value": "New and <span class=\"_ _e\"></span>amended sta<span class=\"_ _2\"></span>ndards and interpretations The standards, amendments<span class=\"_ _2\"></span> and interpretations listed bel<span class=\"_ _e\"></span>ow came into effect in 2022<span class=\"ls1d\">, </span>with little or limited impact on the group:<span class=\"ff45\"> </span>\u2022<span class=\"ff3f\"> <span class=\"_ _62\"> </span><span class=\"fc3\">Ame<span class=\"_ _2\"></span>ndment to IFRS 16 Leases: COVID-<span class=\"ls5b\">19</span>-Related Rent C<span class=\"_ _e\"></span>oncessions beyond<span class=\"_ _2\"></span> 30 June 2021 (applicable for annual periods </span></span>beginnin<span class=\"_ _2\"></span>g on or after 1 April 2021);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _62\"> </span><span class=\"fc3\">Ame<span class=\"_ _2\"></span>ndments to IAS 37 Provisions, Contingent Lia<span class=\"_ _2\"></span>bilities and Contingent Assets; Onerous Contracts <span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span> Cost of Fulfilling a </span></span>Contract (app<span class=\"_ _2\"></span>licable for annual periods beginning on or after 1 January 2022);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _62\"> </span><span class=\"fc3\">Ame<span class=\"_ _2\"></span>ndments to IAS 16 Property, Plant and Equipment: Proceeds before Intended Use (applicable for annual per<span class=\"_ _2\"></span>io<span class=\"_ _e\"></span>ds </span></span>beginnin<span class=\"_ _2\"></span>g on or after 1 January 2022);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _62\"> </span><span class=\"fc3\">Ame<span class=\"_ _2\"></span>ndments to IFRS 3 Business <span class=\"_ _2\"></span>Combinations: Reference to the Conceptual Framework (applicable for annual periods </span></span>beginnin<span class=\"_ _2\"></span>g on or after 1 Janua<span class=\"_ _e\"></span>ry 2022); \u2022<span class=\"ff3f\"> <span class=\"_ _62\"> </span><span class=\"fc3\">Ann<span class=\"_ _2\"></span>ual Improvements to IFRS Standard<span class=\"_ _2\"></span>s 2018<span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span>2020 (applicable for annual periods beginn<span class=\"_ _2\"></span>ing on or after 1 January 2022).<span class=\"_ _20\"></span> </span></span>The <span class=\"ff40\">standards<span class=\"_ _2\"></span>, amendments and interpretations <span class=\"ff3f\">listed<span class=\"_ _e\"></span> below did not ta<span class=\"_ _2\"></span>ke effec<span class=\"_ _e\"></span>t in 2022. The changes <span class=\"ls1d\">to</span> the standards, amendments </span></span>and interpretation<span class=\"_ _2\"></span>s listed below are not expecte<span class=\"_ _e\"></span>d to have a material impact on these annual accounts and are therefore not outlined in any great de<span class=\"_ _2\"></span>tail:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">IFRS 17<span class=\"_ _2\"></span>: Insurance Contracts (applicable for annual periods beginning on or <span class=\"_ _e\"></span>after 1 January 2023);<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Amendm<span class=\"_ _2\"></span>ents to IFRS 17 Insurance contracts: Initial Application of IFRS 17 and IFRS 9 <span class=\"ff42\">\u2013</span> Comparative Information <span class=\"_ _e\"></span>(applicable for </span></span>annual period<span class=\"_ _2\"></span>s beginning on or after 1 January 2023);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Amendm<span class=\"_ _2\"></span>ents to IAS 1 Presentation of Financial Statemen<span class=\"_ _e\"></span>ts: Classification of liabilities as Curre<span class=\"_ _2\"></span>nt or Non-cu<span class=\"_ _e\"></span>rrent (applicable for </span></span>annual period<span class=\"_ _2\"></span>s beginning on or after 1 January 2024, but not yet endorsed in the EU);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Amendm<span class=\"_ _2\"></span>ents to IAS 1 Presentation of Financial Statements and IFRS Practice Statement 2: Disclosur<span class=\"_ _e\"></span>e of Accounting Policies </span></span>(applicab<span class=\"_ _2\"></span>le for annual periods beginning on or after 1 J<span class=\"_ _e\"></span>anuary 2023); \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Amendm<span class=\"_ _2\"></span>ents to IAS 8 Accounting Policies, Changes in Accounting Estimates and Err<span class=\"_ _2\"></span>ors (applicable for annual periods beginning </span></span>on or after<span class=\"_ _2\"></span> 1 January 2023);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3 ls27\">Am<span class=\"ls0\">e<span class=\"_ _2\"></span>ndments to IAS 12 Income Ta<span class=\"_ _2\"></span>xes: Deferred Tax related to Assets and Liabilities arising from a Single Transaction (applicable<span class=\"_ _e\"></span> </span></span></span>for annual period<span class=\"_ _2\"></span>s beginning on or after 1 January 2023);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Amendm<span class=\"_ _2\"></span>ents to IFRS 16 Leases: Lease Liability in a Sale and Leaseback (ap<span class=\"_ _e\"></span>plicable for annual periods beginning on or after 1 </span></span>Januar<span class=\"_ _2\"></span>y 2024, but not yet endorsed in the EU).",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfExpectedImpactOfInitialApplicationOfNewStandardsOrInterpretations",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__144": {
   "value": "2.2. <span class=\"_ _87\"> </span>Functional and presentation currency These <span class=\"_ _2\"></span>consolidated financial statements are presented in million<span class=\"_ _e\"></span>s of euro, rounded to the nearest hundred thousand, unless stated otherwise.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFunctionalCurrencyExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__22": {
   "value": "2.4. <span class=\"_ _87\"> </span>Going concern The d<span class=\"_ _2\"></span>irectors reassessed the going concern assumption <span class=\"_ _e\"></span>of the Company and, at the time of approving the financial statements, held <span class=\"ls5b\">a </span>reasonable expectation tha<span class=\"_ _2\"></span>t the group had ade<span class=\"_ _e\"></span>quate resources to<span class=\"_ _2\"></span> continue in operational existence for the foreseeab<span class=\"_ _e\"></span>le future. The director<span class=\"_ _2\"></span>s will therefore continue to adopt the going concern basis of accounting in t<span class=\"_ _e\"></span>he preparation of the financial statements.<span class=\"_ _e\"></span> In the current con<span class=\"_ _2\"></span>text of inflation (energy crisis) and volatil<span class=\"_ _e\"></span>e market cond<span class=\"_ _2\"></span>itions, th<span class=\"_ _e\"></span>e group paid particular attention to <span class=\"_ _e\"></span>adequately reflecting<span class=\"_ _2\"></span> the current and expected impact of the situation on the financial <span class=\"_ _e\"></span>position, performance and cash flows of the company, applying t<span class=\"_ _2\"></span>he IFRS accounting principles in a consistent manner. In general, <span class=\"_ _e\"></span>since Elia Group is acting in accordance with the regulatory frameworks in Belgium and Germany, the profitab<span class=\"_ _2\"></span>ility and the fina<span class=\"_ _e\"></span>ncial position of the group have not been affected.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGoingConcernExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__23-1": {
   "value": "2.5. <span class=\"_ _87\"> </span>Use of estimates and judgements The preparation of these con<span class=\"_ _2\"></span>solidated financial statements in accordance with IFRS requires management to make judgements, estimates and a<span class=\"_ _2\"></span>ssumptions that could affect the reported amounts of assets and liabilities and revenue and expenses. The estimat<span class=\"_ _e\"></span>es and underlying assumptions are based on historical experience and various other fa<span class=\"_ _2\"></span>ctors that are believed to be rea<span class=\"_ _20\"></span>son<span class=\"_ _2\"></span>able under the circumstan<span class=\"_ _2\"></span>ces: the results of these estimates and assum<span class=\"_ _e\"></span>ptions form the basis for making judgements regarding the carr<span class=\"_ _2\"></span>ying amounts of assets and liabilities. Actual results could therefore differ from these e<span class=\"_ _2\"></span>stimates. The estimates and underlying assumptions are reviewed on an ongoing basis.<span class=\"_ _2\"></span> Revisions to accounting estimates are recognised either: in the period d<span class=\"_ _e\"></span>uring which the estimate is revised if th<span class=\"ls78\">e </span>revision on<span class=\"_ _2\"></span>ly affects this period; or in the period d<span class=\"_ _e\"></span>uring which the estimate is revised and throughout future periods if the revision affects both curren<span class=\"_ _2\"></span>t and future periods.<span class=\"_ _e\"></span> The fo<span class=\"_ _2\"></span>llowing points include information about significant <span class=\"_ _e\"></span>areas of estimation uncertainty and critical judgements in applying accounting policies that have the m<span class=\"_ _2\"></span>ost significant effect on the amounts recognised in the consolidated financial statements:<span class=\"_ _20\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> total allowed remuneration for the g<span class=\"ff42\">roup\u2019s </span>role as TSO <span class=\"ls1c\">in</span> the Belgian and German segments <span class=\"ls1c\">is</span> mainly determined by </span></span>calculation methods set b<span class=\"_ _2\"></span>y the Belgian federal regulator (<span class=\"_ _e\"></span>the Commission for Electricity and Gas Regulation or CRE<span class=\"_ _e\"></span>G) and the German federal regula<span class=\"_ _2\"></span>tor (the Federal Network Agency or<span class=\"_ _e\"></span> BNetzA) respectively<span class=\"ls95\">. <span class=\"_ _2\"></span><span class=\"ls0\">The recognition of deferral regulatory accounts is </span></span>also based on the differen<span class=\"_ _2\"></span>t regulatory schemes. F<span class=\"_ _e\"></span>or certain calculations, a level of professional judgement needs to be applied<span class=\"ls1d\">. </span>More d<span class=\"_ _2\"></span>isclosures are provided in Notes 6.2<span class=\"_ _e\"></span>0, 9.1.4 and 9.2.3. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Entities in which t<span class=\"_ _2\"></span>he group holds less than 20% of the voting rights but has significant influence a<span class=\"_ _e\"></span>re accounted for under the equity </span></span>method. Fo<span class=\"_ _2\"></span>llowing the guidance in IAS 28, the group ass<span class=\"_ _e\"></span>esses whether it has significant influence over its asso<span class=\"_ _2\"></span>ciat<span class=\"_ _e\"></span>es and therefore needs to account for them under the equity method (<span class=\"_ _2\"></span>rather than applying IFRS 9) and reassesses this i<span class=\"_ _e\"></span>n each reporting period (see a<span class=\"_ _2\"></span>lso Note <span class=\"ls5b\">6.<span class=\"_ _e\"></span>5)</span>.  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Defer<span class=\"_ _2\"></span>red tax assets are recognised for the carry-forward of unused tax losses and unused tax credits i<span class=\"_ _e\"></span>n so far as it is probable </span></span>that future taxable<span class=\"_ _2\"></span> profit will be available against which the unused tax losses and unused tax credits can be utilise<span class=\"_ _e\"></span>d. In making a judgement on this, management takes into account e<span class=\"_ _2\"></span>lem<span class=\"_ _e\"></span>ents such as long-term business strategy and tax planning opportunities (see Note 6.7).  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Credit <span class=\"_ _2\"></span>risk related to customers: management closely reviews the outstanding trade receivables, including by considering ageing, </span></span>paymen<span class=\"_ _2\"></span>t history and credit risk coverage (see Note 8.1<span class=\"_ _e\"></span>). \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Employee <span class=\"_ _2\"></span>benefits including reimbursement rights <span class=\"ff42\">\u2013</span> see <span class=\"_ _e\"></span>Note 6.<span class=\"ls5b\">14</span>: </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">The group <span class=\"_ _2\"></span>has d<span class=\"_ _2\"></span>efined benefit <span class=\"_ _2\"></span>plans and <span class=\"_ _2\"></span>defined contribution p<span class=\"_ _2\"></span>lans which a<span class=\"_ _2\"></span>re disclosed <span class=\"_ _2\"></span>in <span class=\"_ _2\"></span>Note 6.15. The ca<span class=\"_ _2\"></span>lculatio<span class=\"_ _e\"></span>n o<span class=\"_ _2\"></span>f <span class=\"_ _2\"></span>the<span class=\"_ _e\"></span> </span></span>liabilities <span class=\"_ _2\"></span>or asse<span class=\"_ _2\"></span>ts related <span class=\"_ _2\"></span>to the<span class=\"_ _2\"></span>se plans is <span class=\"_ _4b\"></span>bas<span class=\"_ _e\"></span>ed <span class=\"_ _2\"></span>on actuarial a<span class=\"_ _2\"></span>nd statistical <span class=\"_ _2\"></span>assumptions. For example, th<span class=\"_ _2\"></span>is is th<span class=\"_ _2\"></span>e case <span class=\"_ _4b\"></span>for<span class=\"_ _e\"></span> the present val<span class=\"_ _e\"></span>ue of f<span class=\"_ _e\"></span>uture <span class=\"_ _e\"></span>pension liabilities. <span class=\"_ _e\"></span>The p<span class=\"_ _e\"></span>resent <span class=\"_ _e\"></span>value is, <span class=\"_ _e\"></span>among o<span class=\"_ _e\"></span>ther facto<span class=\"_ _e\"></span>rs, impacted by <span class=\"_ _e\"></span>c<span class=\"_ _e\"></span>hanges in<span class=\"_ _20\"></span> discount rates, <span class=\"_ _4b\"></span>and <span class=\"_ _2\"></span>financial <span class=\"_ _2\"></span>assumptions <span class=\"_ _4b\"></span>such a<span class=\"_ _2\"></span>s fu<span class=\"_ _2\"></span>ture <span class=\"_ _4b\"></span>inc<span class=\"_ _e\"></span>reases <span class=\"_ _2\"></span>in <span class=\"_ _4b\"></span>salary. <span class=\"_ _2\"></span>In <span class=\"_ _2\"></span>addition<span class=\"_ _2\"></span>, <span class=\"_ _2\"></span>demographic <span class=\"_ _2\"></span>assumptions, <span class=\"_ _4b\"></span>such <span class=\"_ _2\"></span>as <span class=\"_ _2\"></span>average<span class=\"_ _e\"></span> assumed<span class=\"_ _2\"></span> retirement age, also affect the present value of f<span class=\"_ _e\"></span>uture pension liabilities. o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">In <span class=\"_ _20\"></span>determining <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>appropriate <span class=\"_ _5d\"></span>discount <span class=\"_ _20\"></span>rate, <span class=\"_ _20\"></span>management <span class=\"_ _20\"></span>considers <span class=\"_ _20\"></span>th<span class=\"_ _e\"></span>e <span class=\"_ _20\"></span>interest <span class=\"_ _20\"></span>rates <span class=\"_ _20\"></span>of <span class=\"_ _5d\"></span>corporate<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>b<span class=\"_ _e\"></span>onds <span class=\"_ _20\"></span>in <span class=\"_ _20\"></span>currencies<span class=\"_ _e\"></span> </span></span>consistent with <span class=\"_ _e\"></span>cur<span class=\"_ _e\"></span>rencies of <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>post-employment <span class=\"_ _e\"></span>benefi<span class=\"_ _e\"></span>t <span class=\"_ _e\"></span>obligation, i.e. <span class=\"_ _e\"></span>e<span class=\"_ _e\"></span>uro, <span class=\"_ _e\"></span>with <span class=\"_ _e\"></span>at <span class=\"_ _e\"></span>least <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>n <span class=\"_ _e\"></span>AA<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>rating <span class=\"_ _e\"></span>or <span class=\"_ _e\"></span>above, <span class=\"_ _20\"></span>as set by <span class=\"_ _e\"></span>at <span class=\"_ _e\"></span>least <span class=\"_ _20\"></span><span class=\"ls5b\">one <span class=\"_ _e\"></span></span>le<span class=\"_ _e\"></span>ading <span class=\"_ _e\"></span>rating <span class=\"_ _20\"></span>agen<span class=\"_ _2\"></span>cy <span class=\"_ _20\"></span>and<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>extra<span class=\"_ _2\"></span>polated <span class=\"_ _20\"></span>along <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>yield <span class=\"_ _20\"></span>curve <span class=\"_ _e\"></span>to <span class=\"_ _e\"></span>correspond <span class=\"_ _e\"></span>wit<span class=\"_ _e\"></span>h <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>expected ter<span class=\"_ _e\"></span>m <span class=\"_ _20\"></span>of the defined bene<span class=\"_ _2\"></span>fit obligation. Higher and lower yielding bonds are excluded in developing the appropriate yield curve<span class=\"_ _e\"></span>.  o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Each <span class=\"_ _e\"></span>plan's<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>proj<span class=\"_ _e\"></span>ected <span class=\"_ _e\"></span>cash<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>flow<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>is m<span class=\"_ _e\"></span>atched <span class=\"_ _e\"></span>to<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>th<span class=\"_ _e\"></span>e <span class=\"_ _e\"></span>spot <span class=\"_ _20\"></span>rates <span class=\"_ _e\"></span>o<span class=\"_ _e\"></span>f <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>he <span class=\"_ _20\"></span>yield <span class=\"_ _e\"></span>cu<span class=\"_ _e\"></span>rve <span class=\"_ _e\"></span>to<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>calculate <span class=\"_ _20\"></span>an <span class=\"_ _e\"></span>associated <span class=\"_ _20\"></span>present <span class=\"_ _e\"></span>value.<span class=\"_ _e\"></span> </span></span>A single <span class=\"_ _20\"></span>equivalent <span class=\"_ _20\"></span>discount <span class=\"_ _20\"></span>rate <span class=\"_ _20\"></span>is <span class=\"_ _20\"></span>then <span class=\"_ _20\"></span>determined <span class=\"_ _20\"></span>that <span class=\"_ _5d\"></span>produ<span class=\"_ _2\"></span>ces <span class=\"_ _20\"></span>that <span class=\"_ _20\"></span>same <span class=\"_ _20\"></span>present <span class=\"_ _20\"></span>valu<span class=\"_ _e\"></span>e. <span class=\"_ _5d\"></span>The <span class=\"_ _20\"></span>resulting <span class=\"_ _20\"></span>discount<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>rate therefore reflects both the curren<span class=\"_ _2\"></span>t interest rate environme<span class=\"_ _e\"></span>nt and the plan's distinct liability characteristics. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Provisions fo<span class=\"_ _2\"></span>r environmental remediation costs: at each y<span class=\"_ _e\"></span>ear-end, an estimate is made regarding future expenses with respect <span class=\"ls1d\">to</span> </span></span>soil remediation, based<span class=\"_ _2\"></span> on the exp<span class=\"_ _e\"></span>ert advice. The extent of remediation costs is dependent on a lim<span class=\"_ _2\"></span>ited number of uncertainties, including <span class=\"ls5b\">new</span>ly identified cases of soil contamination (see<span class=\"_ _e\"></span> Note 6.1<span class=\"ls5b\">5)</span>. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Other<span class=\"_ _2\"></span> provisions are based on the value of the claims filed or on the estimated amount of the risk exposure. The expected timing </span></span>of the relate<span class=\"_ _2\"></span>d cash outflow depends on the progress and <span class=\"_ _e\"></span>duration of the asso<span class=\"_ _2\"></span>ciated process/procedures (<span class=\"_ _e\"></span>see Note <span class=\"_ _e\"></span>6.1<span class=\"ls5b\">5)</span>. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In de<span class=\"_ _2\"></span>termining the appropriate discount rate to discount the future dismantling obligation, management c<span class=\"_ _e\"></span>onsiders the interest </span></span>rates o<span class=\"_ _2\"></span>f corporate bonds in euro with at least an AA rating<span class=\"_ _e\"></span> or above as <span class=\"_ _2\"></span>set by at least one <span class=\"_ _e\"></span>leading rating agency and extrapolated along the yield curve t<span class=\"_ _2\"></span>o correspond with the expected term of the dismantling obligation. A sensitiv<span class=\"_ _e\"></span>ity analysis is performed to measure the<span class=\"_ _2\"></span> impact of a differing discou<span class=\"_ _e\"></span>nt rate.  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Good<span class=\"_ _2\"></span>will impairment testing: the group performs impairment tests on goodwill and on cash-ge<span class=\"_ _e\"></span>nerating units (CGUs) at the </span></span>repor<span class=\"_ _2\"></span>ting date, and whenever there are indications tha<span class=\"_ _e\"></span>t the carrying amount might be higher than the recoverable amount.<span class=\"_ _2\"></span> This analysis is based on<span class=\"_ _2\"></span> assumptions such as esti<span class=\"_ _e\"></span>mated investment plans, remuneration defined in the regulatory frameworks, market evolutio<span class=\"_ _2\"></span>n, market share, margin evolution and discount rates (s<span class=\"_ _e\"></span>ee Note <span class=\"ls5b\">6.</span>3).<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Fair<span class=\"_ _2\"></span> value measurement of financial instruments: when th<span class=\"_ _e\"></span>e fair va<span class=\"_ _2\"></span>lues of financial assets and financial liabilities recorded in the </span></span>statement of <span class=\"_ _2\"></span>financial position cannot be measured based on quoted prices in active markets, their fair valu<span class=\"_ _e\"></span>e is measured using valuation techniq<span class=\"_ _2\"></span>ues. The inputs fo<span class=\"_ _e\"></span>r these valuation techniques are taken from observable markets where possible. Where this is not fea<span class=\"_ _2\"></span>sible, a certain level of professional judgement is r<span class=\"_ _e\"></span>equired in establishing fair va<span class=\"_ _2\"></span>lues. Changes in t<span class=\"_ _e\"></span>he fair value of the derivative hedg<span class=\"_ _2\"></span>ing instrument designated as a cash flow hedge are recognised directly in OCI t<span class=\"_ _e\"></span>o the extent that the hedge is effective. If the hedge is ineffe<span class=\"_ _2\"></span>ctive, changes in fair value are recognised in profit or loss (see Note <span class=\"_ _e\"></span>6<span class=\"ls1d\">.1<span class=\"ls78\">8)</span></span>. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> useful life of the fixed assets is defined to reflect the r<span class=\"_ _e\"></span>eal depreciation of each asse<span class=\"_ _2\"></span>t. The depreciation of property, plant and </span></span>equipment is m<span class=\"_ _2\"></span>ainly calculated based on the useful lives <span class=\"_ _e\"></span>determined by the regulatory frameworks in Belgium and Germany, which are considered to be the be<span class=\"_ _2\"></span>st possible approximation of actual events in terms of economic utilisati<span class=\"_ _e\"></span>on. (see Note 3.3.1 and 6.1) \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> group makes use of practical expedients when applying IFRS 16 (Leasing): </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">The g<span class=\"_ _e\"></span>roup applies <span class=\"_ _e\"></span>a <span class=\"_ _e\"></span>single <span class=\"_ _e\"></span>discount r<span class=\"_ _e\"></span>ate p<span class=\"_ _e\"></span>er typ<span class=\"_ _e\"></span>e of <span class=\"_ _e\"></span>contracts, <span class=\"_ _e\"></span>summarised pe<span class=\"_ _e\"></span>r thei<span class=\"_ _e\"></span>r duration. <span class=\"_ _e\"></span>Those l<span class=\"_ _e\"></span>eases <span class=\"_ _e\"></span>are <span class=\"_ _e\"></span>as<span class=\"_ _e\"></span>sumed </span></span>to <span class=\"_ _e\"></span>have <span class=\"_ _20\"></span>similar <span class=\"_ _20\"></span>characteristics. <span class=\"_ _20\"></span>The <span class=\"_ _e\"></span>disc<span class=\"_ _e\"></span>ount <span class=\"_ _20\"></span>rate <span class=\"_ _20\"></span>used <span class=\"_ _e\"></span>is<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>g<span class=\"_ _e\"></span>roup's <span class=\"_ _20\"></span>best <span class=\"_ _e\"></span>estim<span class=\"_ _e\"></span>at<span class=\"_ _e\"></span>e <span class=\"_ _20\"></span>of <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>w<span class=\"_ _e\"></span>eighted <span class=\"_ _20\"></span>average <span class=\"_ _20\"></span>incremental borro<span class=\"_ _2\"></span>wing rate. Each lease contract is classified in a duration bucket (&lt;5 years, between 5 and 10 years, etc.) for which an interest <span class=\"_ _e\"></span>rate <span class=\"_ _e\"></span>is <span class=\"_ _20\"></span>derived e<span class=\"_ _e\"></span>qual <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>o <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>interest r<span class=\"_ _e\"></span>ate <span class=\"_ _e\"></span>of <span class=\"_ _20\"></span>a t<span class=\"_ _e\"></span>raded <span class=\"_ _e\"></span>bond <span class=\"_ _20\"></span>with t<span class=\"_ _e\"></span>he <span class=\"_ _e\"></span>sa<span class=\"_ _e\"></span>me <span class=\"_ _e\"></span>rating <span class=\"_ _20\"></span>as E<span class=\"_ _e\"></span>lia <span class=\"_ _e\"></span>Group <span class=\"_ _e\"></span>SA<span class=\"_ _e\"></span>/NV <span class=\"_ _e\"></span>in <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>same<span class=\"_ _e\"></span> sector with <span class=\"ls5b\">a </span>similar duration. The interest rate is fixed over the lifetime of the lease contract. o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">The g<span class=\"_ _e\"></span>roup assesses <span class=\"_ _e\"></span>the n<span class=\"_ _e\"></span>on-cancellable <span class=\"_ _e\"></span>period of <span class=\"_ _e\"></span>each <span class=\"_ _e\"></span>of <span class=\"_ _e\"></span>the contracts <span class=\"_ _20\"></span>falling within the <span class=\"_ _e\"></span>sc<span class=\"_ _e\"></span>ope of <span class=\"_ _e\"></span>IFRS 1<span class=\"_ _e\"></span>6. T<span class=\"_ _e\"></span>his includes<span class=\"_ _e\"></span> </span></span>the period <span class=\"_ _20\"></span>cover<span class=\"_ _2\"></span>ed <span class=\"_ _e\"></span>by <span class=\"_ _20\"></span>an option <span class=\"_ _20\"></span>to extend <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>leas<span class=\"_ _e\"></span>e, <span class=\"_ _e\"></span>if <span class=\"_ _e\"></span>th<span class=\"_ _e\"></span>e <span class=\"_ _e\"></span>lessee <span class=\"_ _e\"></span>is <span class=\"_ _20\"></span>rea<span class=\"_ _2\"></span>sonabl<span class=\"_ _e\"></span>y <span class=\"_ _e\"></span>certain <span class=\"_ _20\"></span>tha<span class=\"_ _2\"></span>t <span class=\"_ _e\"></span>they <span class=\"_ _20\"></span>will <span class=\"_ _e\"></span>exercise <span class=\"_ _e\"></span>that <span class=\"_ _e\"></span>option. Certainly, <span class=\"_ _4b\"></span>whe<span class=\"_ _e\"></span>re it <span class=\"_ _2\"></span>relates <span class=\"_ _2\"></span>to <span class=\"_ _2\"></span>office rent <span class=\"_ _2\"></span>contracts, th<span class=\"_ _2\"></span>e <span class=\"_ _2\"></span>group makes <span class=\"_ _2\"></span>its best<span class=\"_ _2\"></span> estimate o<span class=\"_ _2\"></span>f <span class=\"_ _2\"></span>the non-cancellable <span class=\"_ _4b\"></span>p<span class=\"_ _e\"></span>eriod based <span class=\"_ _2\"></span>on all information a<span class=\"_ _2\"></span>t its disposal (see Note 6.19).<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> impacts of the COVID-19 crisis and macroeconomic developments were taken into account by the group to assess potential </span></span>effects o<span class=\"ff42\">n Elia\u2019s financial performa<span class=\"_ _2\"></span>nce. <span class=\"ff3f\">In general, as Elia<span class=\"_ _e\"></span> is acting in accordance with regulatory frameworks in Belgium and </span></span>Germ<span class=\"ls5b\">an</span>y, its profitability was not significantly affected in 2021 or 2022. During these two years, the COVID pandemic did not significantly impact th<span class=\"_ _2\"></span>e group neither in terms of financial performance nor in terms of the execution of the <span class=\"_ _e\"></span>onshore and offshore infrastr<span class=\"_ _2\"></span>ucture projects in either Belgium <span class=\"ls5b\">or</span> <span class=\"_ _e\"></span>Germany. The only exception to this was, in 2021, Elia Grid International<span class=\"ff42\">\u2019s activities, </span>since the in<span class=\"_ _2\"></span>ternational consulting business was negatively<span class=\"_ _e\"></span> impacted by the COVID-<span class=\"ls5b\">19 <span class=\"_ _e\"></span></span>restrictions, leading to a drop in its revenues. Th<span class=\"_ _2\"></span>is situation was nevertheless offset by cost control measures in COVID times. Effects on macro-econo<span class=\"_ _e\"></span>mic metr<span class=\"_ _2\"></span>ics, such as the interest rate, d<span class=\"_ _2\"></span>iscount rate, etc. - w<span class=\"_ _e\"></span>ere taken into account. The year 2022 has been more im<span class=\"_ _2\"></span>pacted by the war in Uk<span class=\"_ _e\"></span>raine and its consequences on energy prices (inflation). Given the nature a<span class=\"_ _e\"></span>nd location <span class=\"_ _e\"></span>of its <span class=\"_ _e\"></span>operations <span class=\"_ _e\"></span>and the <span class=\"_ _e\"></span>fact <span class=\"_ _e\"></span>that Elia <span class=\"_ _e\"></span>Group does no<span class=\"_ _e\"></span>t currently <span class=\"_ _e\"></span>have activities <span class=\"_ _e\"></span>in Ru<span class=\"_ _e\"></span>ssia nor<span class=\"_ _20\"></span> in Ukraine <span class=\"_ _e\"></span>or with <span class=\"_ _20\"></span>Russian <span class=\"_ _e\"></span>companies, <span class=\"_ _20\"></span>Elia <span class=\"_ _20\"></span>Group <span class=\"_ _20\"></span>has <span class=\"_ _20\"></span>not <span class=\"_ _e\"></span>observed <span class=\"_ _20\"></span>a <span class=\"_ _20\"></span>di<span class=\"_ _e\"></span>rect <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>mpact <span class=\"_ _20\"></span>of <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>Uk<span class=\"_ _e\"></span>rainian <span class=\"_ _e\"></span>c<span class=\"_ _e\"></span>onflict <span class=\"_ _20\"></span>on <span class=\"_ _20\"></span>its <span class=\"_ _e\"></span>busin<span class=\"_ _e\"></span>ess. <span class=\"_ _20\"></span>However, <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>here <span class=\"_ _20\"></span>was <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span> strong push at the <span class=\"_ _e\"></span>European <span class=\"_ _e\"></span>level to beco<span class=\"_ _e\"></span>me less dep<span class=\"_ _e\"></span>endent from <span class=\"_ _e\"></span>Russian gas a<span class=\"_ _e\"></span>nd fossil fuels <span class=\"_ _e\"></span>with a <span class=\"_ _e\"></span>willingness <span class=\"_ _e\"></span>among the aut<span class=\"_ _20\"></span>horities in <span class=\"_ _20\"></span>Belgium <span class=\"_ _e\"></span>and <span class=\"_ _e\"></span>Ge<span class=\"_ _e\"></span>rmany <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>o <span class=\"_ _20\"></span>accelerate <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>energ<span class=\"ff42\">y <span class=\"_ _20\"></span>transition. <span class=\"_ _20\"></span>This <span class=\"_ _e\"></span>led <span class=\"_ _20\"></span>to <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>n <span class=\"_ _20\"></span>increa<span class=\"_ _2\"></span>se <span class=\"_ _20\"></span>of <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>Group\u2019s <span class=\"_ _20\"></span>investment <span class=\"_ _e\"></span>p<span class=\"_ _e\"></span>rogram <span class=\"_ _e\"></span>ov<span class=\"_ _e\"></span>er <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>mid<span class=\"ff3f\">-</span></span>term.  With <span class=\"_ _e\"></span>regard <span class=\"_ _20\"></span>to <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>increasing <span class=\"_ _e\"></span>inflation <span class=\"_ _20\"></span>rates, <span class=\"_ _20\"></span>this <span class=\"_ _e\"></span>is <span class=\"_ _20\"></span>a <span class=\"_ _e\"></span>m<span class=\"_ _e\"></span>atter <span class=\"_ _20\"></span>of co<span class=\"_ _e\"></span>ncern <span class=\"_ _e\"></span>fo<span class=\"_ _e\"></span>r <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>he <span class=\"_ _e\"></span>gro<span class=\"_ _e\"></span>up <span class=\"_ _e\"></span>even<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>if <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>t <span class=\"_ _20\"></span>operates <span class=\"_ _e\"></span>under<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>regulatory <span class=\"_ _20\"></span>framewor<span class=\"_ _2\"></span>k <span class=\"_ _20\"></span>to offset m<span class=\"_ _e\"></span>ajor <span class=\"_ _e\"></span>c<span class=\"_ _e\"></span>ost <span class=\"_ _e\"></span>increases<span class=\"ls95\">. <span class=\"_ _e\"></span></span>The <span class=\"_ _e\"></span>impacts <span class=\"_ _20\"></span>of <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>current <span class=\"_ _e\"></span>market <span class=\"_ _e\"></span>volatility <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>nd <span class=\"_ _e\"></span>macroeconomic <span class=\"_ _20\"></span>deve<span class=\"_ _2\"></span>lopments <span class=\"_ _20\"></span>were <span class=\"_ _e\"></span>taken <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>nto <span class=\"_ _e\"></span>account<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>by<span class=\"_ _e\"></span> the group to <span class=\"_ _e\"></span>assess <span class=\"_ _e\"></span>potential <span class=\"_ _e\"></span>effects <span class=\"_ _e\"></span>on Elia\u2019s <span class=\"_ _e\"></span>financial <span class=\"_ _e\"></span>performance <span class=\"_ _e\"></span>and the <span class=\"_ _e\"></span>valuation of i<span class=\"_ _e\"></span>ts <span class=\"_ _e\"></span>assets a<span class=\"_ _e\"></span>nd liabilities<span class=\"_ _e\"></span><span class=\"ff3f\"> <span class=\"_ _20\"></span>(see note <span class=\"_ _e\"></span>4.4, <span class=\"_ _e\"></span>5.2, 5.3, </span>6.15 an<span class=\"_ _2\"></span>d 6.17). In particular, key <span class=\"_ _2\"></span>assumptions used in the calculation of <span class=\"_ _2\"></span>the post employments obliga<span class=\"_ _2\"></span>tions have been reviewed to ensure a proper valuation as per 31 D<span class=\"_ _e\"></span>ecember 2022<span class=\"_ _e\"></span> (see note 6.<span class=\"_ _e\"></span>14)<span class=\"ls1d\">. </span>The group<span class=\"_ _e\"></span> assessed whether its non-<span class=\"_ _e\"></span>financial assets might be impai<span class=\"_ _e\"></span>red: it<span class=\"_ _e\"></span> carried<span class=\"_ _2\"></span> <span class=\"_ _5d\"></span>out <span class=\"_ _5d\"></span>a<span class=\"_ _e\"></span>n <span class=\"_ _5d\"></span>analysis <span class=\"_ _5d\"> </span>of <span class=\"_ _24d\"> </span>potential <span class=\"_ _5d\"></span>impairment <span class=\"_ _5d\"> </span>indicat<span class=\"_ _e\"></span>ors, <span class=\"_ _5d\"> </span>i<span class=\"_ _e\"></span>n <span class=\"_ _5d\"></span>accordance<span class=\"_ _2\"></span> <span class=\"_ _5d\"></span>with <span class=\"_ _24d\"> </span>the <span class=\"_ _5d\"></span>provisions <span class=\"_ _5d\"></span>of <span class=\"_ _5d\"></span>IAS<span class=\"_ _e\"></span> <span class=\"_ _5d\"></span>36 <span class=\"_ _24d\"> </span><span class=\"ff42\">\u2013</span> <span class=\"_ _5d\"> </span>Impairment <span class=\"_ _5d\"></span>of <span class=\"_ _24d\"> </span>Assets. <span class=\"_ _5d\"></span>The impairm<span class=\"_ _2\"></span>ent test was carried out based on the last busines<span class=\"_ _e\"></span>s plan; this identified no impairment risks as per 31 Dece<span class=\"_ _e\"></span>mber 2022. The <span class=\"_ _4b\"></span>different <span class=\"_ _2\"></span>crisis <span class=\"_ _2\"></span>and, <span class=\"_ _4b\"></span>in 2022, <span class=\"_ _4b\"></span>the<span class=\"_ _e\"></span> <span class=\"_ _2\"></span>strong <span class=\"_ _4b\"></span>increase o<span class=\"_ _2\"></span>f e<span class=\"_ _2\"></span>lectricity <span class=\"_ _2\"></span>prices <span class=\"_ _4b\"></span>could result <span class=\"_ _4b\"></span>in a <span class=\"_ _4b\"></span>po<span class=\"_ _e\"></span>tentially <span class=\"_ _4b\"></span>i<span class=\"_ _e\"></span>ncreased <span class=\"_ _4b\"></span>c<span class=\"_ _e\"></span>redit <span class=\"_ _2\"></span>risk <span class=\"_ _2\"></span>and <span class=\"_ _4b\"></span>may <span class=\"_ _2\"></span>therefore affect the am<span class=\"_ _2\"></span>ount of impairment losses to be recognised <span class=\"_ _e\"></span>with respect to expected credit losses. The group has since monitored payment receipts and counterpar<span class=\"_ _2\"></span>ty risk more closely, noting no significant deterioration. We refer<span class=\"_ _2\"></span> to the following notes for more information: 6.3, 6.9, 6.19 and 8.1.1.<span class=\"ls0\"> <span class=\"_ _53\"></span><span class=\"ff3f fs11 fc3\">Discounting <span class=\"_ _e\"></span>of future<span class=\"_ _2\"></span> cash flows (DCF-m<span class=\"_ _e\"></span>odels): </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity of 9.3%; </span></span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Risk-fr<span class=\"_ _2\"></span>ee-rate: 2.2% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Beta<span class=\"_ _2\"></span> 0.93 </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Equity m<span class=\"_ _2\"></span>arket risk premium 5.5% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Cou<span class=\"_ _2\"></span>ntry risk premium 1.0% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Sma<span class=\"_ _2\"></span>ll firm premium 1.0% </span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Pre-tax Cost of Debt of 3.8%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Corporate tax rate of 25%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Target gearing (D/(D+E)): 60%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Post-tax WACC: 5.4%. </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on two variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a 1.13x RAB multiple in 2032  </span></span>NB: as such, the RAB itself does not take into account the contribution that the incentive remuneration makes to the value creation<span class=\"_ _2\"></span> process.<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal <span class=\"_ _20\"></span>value <span class=\"_ _20\"></span>based <span class=\"_ _e\"></span>on<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>a <span class=\"_ _20\"></span>perpetual <span class=\"_ _e\"></span>g<span class=\"_ _e\"></span>rowth <span class=\"_ _20\"></span>rate <span class=\"_ _20\"></span>of <span class=\"_ _e\"></span>3.<span class=\"_ _e\"></span>3<span class=\"_ _e\"></span>%. <span class=\"_ _20\"></span>This <span class=\"_ _20\"></span>long<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>term <span class=\"_ _20\"></span>growth <span class=\"_ _20\"></span>rate <span class=\"_ _e\"></span>is <span class=\"_ _20\"></span>hi<span class=\"_ _e\"></span>gher <span class=\"_ _20\"></span>than <span class=\"_ _20\"></span>long<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>term <span class=\"_ _20\"></span>expected </span></span>inflation to<span class=\"_ _2\"></span> capture the returns generated from the si<span class=\"_ _e\"></span>gnificant investments in the business plan. 2.<span class=\"ls0\"> <span class=\"_ _53\"></span><span class=\"ff3f fs11 fc3\">Discounting <span class=\"_ _e\"></span>of future<span class=\"_ _2\"></span> dividends <span class=\"_ _e\"></span>(DDM-models):  </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity of 9.3% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on two variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on 1.13x RAB multiple in 2032<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> </span></span>NB: as such, th<span class=\"_ _2\"></span>e RAB<span class=\"_ _e\"></span> itself does <span class=\"_ _2\"></span>not take into account <span class=\"_ _e\"></span>the contribution of the incentive remuneration to the value creation process. o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a perpetual growth rate of 3.3<span class=\"_ _e\"></span><span class=\"ls24\">%.</span> Th<span class=\"_ _2\"></span>is approach assumes that the residual value consists <span class=\"_ _e\"></span>of profit </span></span>after tax less invest<span class=\"_ _e\"></span>ments and considers <span class=\"_ _e\"></span>net borrowings (i<span class=\"_ _e\"></span>n relation to th<span class=\"_ _e\"></span>e investments). <span class=\"_ _e\"></span>Howeve<span class=\"_ _e\"></span>r, profit <span class=\"_ _e\"></span>and thus di<span class=\"_ _e\"></span>vidend<span class=\"_ _e\"></span> paymen<span class=\"_ _2\"></span>ts in FY32 most likely does not yet reflect the (po<span class=\"_ _e\"></span>sitive) impact of the investments planned in FY26-FY32.<span class=\"_ _e\"></span> Conclusion: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> independent analysis, which was based on a <span class=\"ff42\">(\u20ac3,127 million)</span> midpoint of the different valuation approaches and variants </span></span>used did not result in<span class=\"_ _2\"></span> the identification of an<span class=\"_ _e\"></span> impairment of goodwill in the financial year 2022. Moreover, market multiples (based on current <span class=\"_ _2\"></span>enterprise values and current/forecasted EBITDA) were applied for plausibility.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">As the m<span class=\"_ _2\"></span>edian and the average of the different methods presented above w<span class=\"ff42\">er<span class=\"_ _e\"></span>e relatively far apart (\u20ac2.625 million and \u20ac4.635</span> </span></span>million respectively), mainly d<span class=\"_ _2\"></span>ue to differen<span class=\"ff42\">ces in <span class=\"_ _e\"></span>assumptions for<span class=\"_ _2\"></span> the terminal value, the expert\u2019s mid<span class=\"ff3f\">-poi<span class=\"_ _e\"></span>nt is based on 75% of </span></span>the median and 25<span class=\"_ _2\"></span>% of the average, bearing in mind, among other factors, that the median alone might not appropriately reflect the impa<span class=\"_ _2\"></span>ct of incentive remuneration on the t<span class=\"_ _e\"></span>erminal value (see above for more details)<span class=\"_ _2\"></span>. <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Due to<span class=\"_ _2\"></span> the increase in 2022 in the interest rates, the discount rate has increased significantly compared to last year. This <span class=\"_ _e\"></span>increase </span></span>has been fully ta<span class=\"_ _2\"></span>ken into account in the cost of equity wit<span class=\"_ _e\"></span>hout considering that it could be more linked to the maximu<span class=\"_ _e\"></span>m allowed return. Th<span class=\"_ _2\"></span>is approach results in conservative values. T<span class=\"_ _e\"></span>he valorisation is also impacted by the significant investments (and related cash outs) expected on the horizon of the plan (a<span class=\"_ _2\"></span>cceleration of the energy transition) whereas the returns on these investments will materialise<span class=\"_ _2\"></span> over a longer period. I<span class=\"_ _e\"></span>n this context, and all other things being equal, an increase of 1% of the cost of equity/ 50 basis point <span class=\"_ _2\"></span>in the WACC (market reference) would result i<span class=\"_ _e\"></span>n a 22% lower value<span class=\"_ _2\"></span> in use and a potential impairment loss of around \u20ac<span class=\"ff3f\">385.0<span class=\"_ _2\"></span> million. The evolution of market parameters is clos<span class=\"_ _e\"></span>ely monitored b<span class=\"_ _2\"></span>y the group <span class=\"_ _e\"></span>with the regulator in order to s<span class=\"_ _e\"></span>ecure the </span>realization<span class=\"_ _2\"></span> of the expected investments and allow ETB to <span class=\"_ _e\"></span>keep a strong<span class=\"_ _2\"></span> position in the market. A<span class=\"_ _e\"></span> decrease of 1% of the cost of equity/ 50 basis points in the d<span class=\"_ _2\"></span>iscount rates used would le<span class=\"_ _e\"></span>ad to an increase in the value of <span class=\"_ _2\"></span>the CGU of around \u20ac<span class=\"_ _e\"></span><span class=\"ff3f\">1,2<span class=\"_ _e\"></span>05.0 million<span class=\"_ _2\"></span>. </span>Acquisi<span class=\"_ _e\"></span>tion<span class=\"_ _2\"></span> of Eurogrid International \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In April 2<span class=\"_ _2\"></span>018, the acquisition of an extra 20% stake in Eurogrid International by the group <span class=\"ff42\">for \u20ac988.7</span> million resulted<span class=\"_ _e\"></span> in a goodwill </span></span>of \u20ac703.4<span class=\"ff3f\"> million, being the d<span class=\"_ _2\"></span>ifference between the ac<span class=\"_ _e\"></span>quisition value of this stake and the proportional carrying amount of its </span>assets. The goodwill re<span class=\"_ _2\"></span>sulting from the additional 20% sta<span class=\"_ _e\"></span>ke in Eurogrid In<span class=\"_ _2\"></span>ternational was allocated to the <span class=\"_ _e\"></span>CGU 50Hertz Transmission, sin<span class=\"_ _2\"></span>ce it comprises all income and ex<span class=\"_ _e\"></span>penses generated<span class=\"_ _2\"></span> thereof.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> impairment test was conducted by an independent expert. This impairment test is based on two main valuation methods: 1<span class=\"_ _e\"></span>) a </span></span>discounted cash flo<span class=\"_ _2\"></span>ws (DCF) method; a<span class=\"_ _e\"></span>nd 2) a dividend discount m<span class=\"_ _2\"></span>odel (DDM). Both <span class=\"_ _e\"></span>of these are further detached in valuation variants depending on the<span class=\"_ _2\"></span> terminal value calculation. Future cash flows and future dividends are based on a busi<span class=\"_ _e\"></span>ne<span class=\"_ _e\"></span>ss plan for the<span class=\"_ _2\"></span> period 2021-2031 (two regulatory periods). As the <span class=\"ff42\">group\u2019s </span>asset base consists of assets with long useful lives, the <span class=\"ff42\">b<span class=\"_ _e\"></span>usiness plan\u2019s</span> projection period was set to encompass the next two regulatory periods. The va<span class=\"_ _2\"></span>luation methods are subject to different assumptions, most importantly:<span class=\"_ _e\"></span> 1.<span class=\"ls0\"> <span class=\"_ _53\"></span><span class=\"ff3f fs11 fc3\">Discounting <span class=\"_ _e\"></span>of future<span class=\"_ _2\"></span> cash flows (DCF-m<span class=\"_ _e\"></span>odels): </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity: 8.3%; </span></span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Risk-fr<span class=\"_ _2\"></span>ee-rate: 2.2% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Beta<span class=\"_ _2\"></span> 0.93 </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Equity m<span class=\"_ _2\"></span>arket risk premium 5.5% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Cou<span class=\"_ _2\"></span>ntry risk premium 0.0% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Sma<span class=\"_ _2\"></span>ll firm premium 1.0% </span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Pre-tax Cost of Debt: 3.8%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Corporate tax rate: 30%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Target gearing (D/(D+E)): 60%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">WAC<span class=\"_ _e\"></span>C: 4.9%. </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on three variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a 1<span class=\"ls1d\">.1</span>3x RAB multiple in 2032; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a perpetual growth rate of 2.0<span class=\"ls24\">%.</span> </span></span>2.<span class=\"ls0\"> <span class=\"_ _57\"></span><span class=\"ff3f fs11 fc3\">D<span class=\"_ _e\"></span>iscounting of future dividends <span class=\"_ _e\"></span>(DDM-models): <span class=\"_ _2\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity: 8.3% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on two variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on 1.13x RAB multiple in 2032;<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a perpetual growth rate of 2.0%. </span></span>Conclusion: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Neither<span class=\"_ _2\"></span> the independent analysis, which was based on a <span class=\"ff42\">(<span class=\"_ _e\"></span>\u20ac2,602 million)</span> midpoint of the different valuation approaches and<span class=\"_ _2\"></span> </span></span>variants u<span class=\"_ _2\"></span>sed, nor the sensitivity analysis result<span class=\"ls5b\">ed</span> in<span class=\"_ _e\"></span> the identification of an impairment of goodwill in the financial year 2022<span class=\"ls1d\">. </span>Moreo<span class=\"_ _2\"></span>ver, market multiples (based on current enterprise values and current/forecasted EBITDA) were applied for plausibility.<span class=\"_ _20\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> median of the different methods presented above w<span class=\"ff42\">e<span class=\"_ _e\"></span>re rela<span class=\"_ _2\"></span>tively close (\u20ac2,602 million and \u20ac3,055 million respectively), as the </span></span></span>assumptions for<span class=\"_ _2\"></span> the terminal value were similar. Neither the independent analysis<span class=\"_ _e\"></span> based on a median of the different valuation approaches and variants used, nor the sensitivity analysis resulted in the identification of an impairment of goodwill in the financial year 2022. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Due to<span class=\"_ _2\"></span> the increase in 2022 in the interest rates, the discount rate has increased significantly compared to last year. This <span class=\"_ _e\"></span><span class=\"ls1c\">in</span>crease </span></span>has been fully ta<span class=\"_ _2\"></span>ken into account in the cost of equity wit<span class=\"_ _e\"></span>hout considering that it could be more linked to the maximu<span class=\"_ _e\"></span>m allowed return. Th<span class=\"_ _2\"></span>is approach results in conservative values. T<span class=\"_ _e\"></span>he valorisation is also impacted by the significant investments (and related cash outs) expected on the horizon of the plan (a<span class=\"_ _2\"></span>cceleration of the energy transition) whereas the returns on these investments will materialise<span class=\"_ _2\"></span> over a longer period. I<span class=\"_ _e\"></span>n this context, and all other things being equal, an increase of 1% of the cost of equity/ 50 basis point <span class=\"_ _2\"></span>in the WACC (market reference) would result i<span class=\"_ _e\"></span>n a <span class=\"ls5b\">19</span>% lower value in use, being a value slightly higher than the book value. A decrease<span class=\"_ _2\"></span> of 1% of the cost of equity/ 50 basis points in the discount rates used would lead to an increase i<span class=\"_ _e\"></span>n the value of the CGU of arou<span class=\"_ _2\"></span>nd \u20ac<span class=\"ff3f\">385.8 million.<span class=\"_ _e\"></span> </span>ACTUARIAL ASSUMPTIONS (in % and years) Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Discount ra<span class=\"_ _2\"></span>te<span class=\"_ _e\"></span> - Pensions - defined benefit p<span class=\"_ _2\"></span>lans and cash balance - best off plans 3.75% 0.83% 3.59% 1.26% - Pensions - defined con<span class=\"_ _2\"></span>tribution plans<span class=\"_ _e\"></span> 3.77% 1.12% - - - Other 3.75% 1.14% 3.59% 1.26% Expected average salar<span class=\"_ _2\"></span>y increase (excluding inflation)<span class=\"_ _e\"></span> 1.00% 1.00% 2.75% 2.15% Expected infla<span class=\"_ _2\"></span>tion<span class=\"_ _e\"></span> 2.10% 1.75% 2.50% 2.00% Expected increase in<span class=\"_ _2\"></span> health benefits (including inflation)<span class=\"_ _e\"></span> 3.10% 2.75% 2.25% 2.25% Expected increase in<span class=\"_ _2\"></span> tariff advantages<span class=\"_ _e\"></span> 2.10% 1.75% - - Average a<span class=\"_ _2\"></span>ssumed retirement age - Employee 63<span class=\"ls0\"> </span>63<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>- Manager 65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>Life expectancy in y<span class=\"_ _2\"></span>ears of a pensioner retiring at age 65 at clos<span class=\"_ _2\"></span>ing date:*<span class=\"_ _e\"></span> Life expe<span class=\"_ _2\"></span>ctancy for a 65 year old male<span class=\"_ _e\"></span> 19.9 19.9 20.7 20.5 Life expe<span class=\"_ _2\"></span>ctancy for a 65 year old female<span class=\"_ _e\"></span> 23.6 23.6 24.1 24<span class=\"ls0\"> </span>*Mortality tables used: IABE in Belgium, 2018 Heubeck in Germany (in years ) Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Weighted a<span class=\"_ _2\"></span>verage duration of the defined benefit obligati<span class=\"_ _e\"></span>on 8.0                       <span class=\"_ _e\"></span>   <span class=\"ls0\">8.5 <span class=\"_ _e\"></span> </span>23.4 28.7 Weighted a<span class=\"_ _2\"></span>verage duration of the defined contribution plans<span class=\"_ _e\"></span> 9.7                       <span class=\"_ _e\"></span>   <span class=\"ls0\">9.7 <span class=\"_ _e\"></span> </span>n.r. n.r. Weighted a<span class=\"_ _2\"></span>verage duration of the post<span class=\"_ _e\"></span>-employment benefits other than pensions 13.2                       <span class=\"_ _e\"></span> <span class=\"ls0\">13.2 <span class=\"_ _e\"></span> </span>12.7 14.0 In Germany, the liability o<span class=\"_ _2\"></span>f the defined cont<span class=\"_ _e\"></span>ribution plans is complete<span class=\"_ _2\"></span>ly covered by the plan assets. Therefore, no w<span class=\"_ _e\"></span>eighted average duration is necessary and thus not <span class=\"_ _2\"></span>calculated.<span class=\"_ _e\"></span> The a<span class=\"_ _2\"></span>ctual return on plan assets in percentage terms f<span class=\"_ _e\"></span>or 20<span class=\"ls5b\">22</span> was negative, ranged between -2.6% and -18.0% (compared with a range<span class=\"_ _2\"></span> of 2.7% to 12.0%<span class=\"_ _e\"></span> in 2021<span class=\"ls8f\">).</span> Below is an over<span class=\"_ _2\"></span>view of the expected cash outflows for the DB plans:<span class=\"_ _e\"></span> Future expected cash<span class=\"_ _2\"></span> outflows<span class=\"_ _e\"></span> &lt; 12 months 1-5 years 6 <span class=\"ls0\">- 10 years </span>Pensions (4.6) (20.4) (25.3) Other (0.1) (0.3) (0.4) Total (in \u20ac million)<span class=\"ff40\"> </span>(4.7) (20.7) (25.7) There is some degree of uncertainty<span class=\"_ _2\"></span> linked to the above e<span class=\"_ _e\"></span>xpected cash outflows which can be explained by the following factors:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">differ<span class=\"_ _2\"></span>ences between assumptions and actual data can occur, e.g. retirement age and future salary increase;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the e<span class=\"_ _2\"></span>xpected cash outflows shown above are based on a closed population and therefore do not incorporate future new hir<span class=\"_ _2\"></span>es;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">futur<span class=\"_ _2\"></span>e premiums are calculated based on the last known aggregate cost rate, which is reviewed on an annual basis and varies </span></span>depend<span class=\"_ _2\"></span>ing on the return on plan assets, the actu<span class=\"_ _e\"></span>al salary increase<span class=\"_ _2\"></span> as opposed to the assumptions, and unexpected changes in<span class=\"_ _e\"></span> the population<span class=\"_ _2\"></span>.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAccountingJudgementsAndEstimatesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__24": {
   "value": "2.6. <span class=\"_ _87\"> </span>Approval by the Board of Directors These consolida<span class=\"_ _2\"></span>ted financial statements were authorised for publication by the Board of Directors on <span class=\"_ _e\"></span><span class=\"ls5b\">30 </span>March 202<span class=\"_ _e\"></span>3.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAuthorisationOfFinancialStatementsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__142-1": {
   "value": "3.1. <span class=\"_ _87\"> </span>Basis of consolidation SUBSIDIARIES A subsidiary is a<span class=\"_ _2\"></span>n entity that is controlled by the Compan<span class=\"_ _e\"></span>y. The group controls an entity when it is exposed, or has rights, to variable return<span class=\"_ _2\"></span>s from its involvement with the entity and has the abil<span class=\"_ _e\"></span>ity to affe<span class=\"_ _2\"></span>ct those returns th<span class=\"_ _e\"></span>rough its power over the entity. The financial statements of <span class=\"_ _2\"></span>subsidiaries are included in the consolidated financial st<span class=\"_ _e\"></span>atements from the date this control commences until the date that it ceases. The a<span class=\"_ _2\"></span>ccounting policies of subsidiaries are changed when necessary, in order to align them with the policies adopted by the group<span class=\"_ _2\"></span>. Losses applicable to the non-controlling interests in a subsidiary are allocated to the non-controlling interest<span class=\"_ _e\"></span>s even if th<span class=\"_ _2\"></span>is results in a deficit <span class=\"_ _2\"></span>balance of the non-controlling interests.<span class=\"_ _e\"></span> Changes <span class=\"ls1d\">to</span> the group's interest in a non-wholly-owned subsidiary that do not result in a loss of contro<span class=\"_ _2\"></span>l are accounted for as equity transactions.<span class=\"_ _e\"></span> ASSOCIAT<span class=\"ls43\">ES</span> Associates are<span class=\"_ _2\"></span> those companies over which the Compan<span class=\"_ _e\"></span>y exerts significant in<span class=\"_ _2\"></span>fluence, but not control, in <span class=\"_ _e\"></span>terms of the<span class=\"ls1c\">ir</span> financial and opera<span class=\"_ _2\"></span>ting policies. Investments in associates are account<span class=\"_ _e\"></span>ed for in the consolida<span class=\"_ _2\"></span>ted financial statements in accordance with t<span class=\"_ _e\"></span>he equity method. They ar<span class=\"_ _2\"></span>e initially recognised in the consolidated statement of financial position at cost, with all transaction costs incurred with the acqu<span class=\"_ _2\"></span>isition included, and are adjusted t<span class=\"_ _e\"></span>hereafter to reflect the g<span class=\"ff42\">roup\u2019s share of the profit or loss and other comprehensive income of </span>the associa<span class=\"_ _2\"></span>te. This accounting under the equity method is<span class=\"_ _e\"></span> done from the date that sign<span class=\"_ _2\"></span>ificant influence commences until the<span class=\"_ _e\"></span> date that it ceases. When the group's share of the losses e<span class=\"_ _2\"></span>xceeds its interest in an associate, its carrying amount is reduced to ni<span class=\"_ _e\"></span>l and further losses are<span class=\"_ _2\"></span> not recognised except to the extent t<span class=\"_ _e\"></span>hat the group ha<span class=\"_ _2\"></span>s incurred legal or constructive obligations or has <span class=\"_ _e\"></span>made payments on behalf o<span class=\"_ _2\"></span>f an associate. INTERESTS IN JOINT VENTURES  A joint venture is an arrangement under which t<span class=\"_ _2\"></span>he gr<span class=\"_ _e\"></span>oup has joint control and has rights to the net assets of the<span class=\"_ _2\"></span> arrangement, as opposed to join<span class=\"_ _2\"></span>t operations, under which the g<span class=\"_ _e\"></span>roup has rights to its assets and ob<span class=\"_ _2\"></span>ligations for its liabilities. Interests in joint ventures are accounted for<span class=\"_ _2\"></span> using the equity method. They are initially r<span class=\"_ _e\"></span>ecognised<span class=\"_ _2\"></span> at cost price, with all transaction costs incurred with the acquisition included. <span class=\"_ _2\"></span>Subsequent to initial recognition, the consolidated financial statements include the gr<span class=\"_ _e\"></span>oup's share of the total recognised profits and losses of joint <span class=\"_ _2\"></span>ventures on the basis of the equity method, from the date that joint control commences until the <span class=\"_ _e\"></span>date that it cea<span class=\"_ _2\"></span>ses. When the group's shar<span class=\"_ _2\"></span>e of the losses exceeds its interest<span class=\"_ _e\"></span> in joint ventures,<span class=\"_ _2\"></span> its carrying amount is reduced to nil and<span class=\"_ _e\"></span> furthe<span class=\"_ _e\"></span>r losses are not re<span class=\"_ _2\"></span>cognised except to the extent that the <span class=\"_ _e\"></span>group has incurre<span class=\"_ _2\"></span>d legal or constructive obligations or has made payments on behalf of a joint venture<span class=\"ls1d\">. </span> N<span class=\"ls101\">ON</span>-CONTROLING INTERESTS  Non-controlling in<span class=\"_ _2\"></span>terests are measured in line with their pr<span class=\"_ _e\"></span>oportional share of the acquiree's identifiable net assets on the acquisition date.  LOSS OF CONTROL Upon the<span class=\"_ _2\"></span> loss of control, the group derecognis<span class=\"_ _e\"></span>es the assets and liabilities of the subsidiary, any non-controlling interests and the other components o<span class=\"_ _2\"></span>f other comprehensive income related to the subsidiary. Any surplus or deficit arising on the loss of control is recogn<span class=\"_ _2\"></span>i<span class=\"_ _e\"></span>s<span class=\"_ _e\"></span><span class=\"ls5b\">ed </span>in profit or loss.<span class=\"_ _2\"></span> If the group retains any interest in the fo<span class=\"_ _e\"></span>rmer subsidiary, then such interest is measured at fair value <span class=\"_ _e\"></span><span class=\"ls5b\">on </span>the date that control is lo<span class=\"_ _2\"></span>st. Subsequently, it is accounted for as an equ<span class=\"_ _e\"></span>ity-accounted investee or as a fair value financial asset depending on the level of influen<span class=\"_ _2\"></span>ce retained. ELIMINATION OF INTRA-GROUP TRANSACTIONS Intra-group ba<span class=\"_ _2\"></span>lances and any unrealised gains or losses <span class=\"_ _e\"></span>or income and expenses arising from intra-group transactions are eliminated when prepar<span class=\"_ _2\"></span>ing the consolidated financial statements. <span class=\"_ _e\"></span> Unrealised<span class=\"_ _2\"></span> gains from transactions with associates <span class=\"_ _e\"></span>are eliminated to the extent of the group's interest in the entity. Unrealised losses are eliminated<span class=\"_ _2\"></span> in the same way as unrealised gains, but only to the extent that there is no evidence of<span class=\"_ _e\"></span> impairment.<span class=\"_ _e\"></span> BUSINESS COMBINA<span class=\"_ _2\"></span>TION AND GOODWILL<span class=\"_ _e\"></span> Goodwill arise<span class=\"_ _2\"></span>s on the acquisition of subsidiaries<span class=\"_ _e\"></span> <span class=\"ls5b\">and </span>repr<span class=\"_ _e\"></span>esents the excess of the consideration transferred over the group's interest in the net fair va<span class=\"_ _2\"></span>lue of the net identifiable assets, liabilities and contingent liabilities of the acquiree. The group<span class=\"_ _2\"></span> measures goodwill <span class=\"ls5b\">on</span> <span class=\"_ _e\"></span>the acquisition date as:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the f<span class=\"_ _2\"></span>air value of the consideration transferred; plus </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the r<span class=\"_ _2\"></span>ecognised amount of any non-controlling interest in the acquiree; plus<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">if the b<span class=\"_ _2\"></span>usiness combination is completed in stages, the fai<span class=\"_ _e\"></span>r value of the pre-existing equity interest in the acquiree; less </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the f<span class=\"_ _2\"></span>air value of the identifiable assets acquired and liabilities at acquisition date.<span class=\"_ _e\"></span> </span></span>When the excess is n<span class=\"_ _2\"></span>egative, a gain on a bar<span class=\"_ _e\"></span>gain purchase is recognised immed<span class=\"_ _2\"></span>iately in profit or loss.<span class=\"_ _e\"></span> The consider<span class=\"_ _2\"></span>ation transferred does not include amounts related to the settleme<span class=\"_ _e\"></span>nt of pre-existing relationships. Such amounts are generally reco<span class=\"_ _2\"></span>gnised in profit or loss.<span class=\"_ _e\"></span> Transa<span class=\"_ _2\"></span>ction costs incurred by the group in connection with a business combination, other th<span class=\"_ _e\"></span>an those associated with the issue of debt or equity securities, are expensed as incurred. Any contingent con<span class=\"_ _2\"></span>sideration payable is measured at fair value at the acquisition date. If the contingent consideration is classified as equity, then it is not remea<span class=\"_ _2\"></span>sured and settlement is accounted for within equity. Otherwise, subsequ<span class=\"_ _e\"></span>ent changes in the fair value of the contingent consideration are re<span class=\"_ _2\"></span>cognised in profit or loss.<span class=\"_ _e\"></span> 3.2. <span class=\"_ _87\"> </span>Foreign cu<span class=\"_ _e\"></span>rrency translati<span class=\"_ _2\"></span>on FOREIGN CURRENCY TRANSAC<span class=\"_ _2\"></span>TIONS AND BALANCES <span class=\"_ _e\"></span> Transa<span class=\"_ _2\"></span>ctions in foreign currencies are converted into the f<span class=\"_ _e\"></span>unctional currency of the Company <span class=\"_ _2\"></span>at the foreign exchan<span class=\"_ _e\"></span>ge rate on the date of the transaction<span class=\"_ _2\"></span>. Monetary assets and liabilities denominated in foreign currencies on the <span class=\"_ _e\"></span>reporting date are converted at the foreign exchange rate on that date. For<span class=\"_ _2\"></span>eign exchange differences arising on conversion are recognised in profit or loss.<span class=\"_ _e\"></span> Non-monetar<span class=\"_ _2\"></span>y assets and liabilities denominated in foreign currencies that are valued in terms of historical cost are converted <span class=\"_ _e\"></span>at the exchange rate on the d<span class=\"_ _2\"></span>ate of the transaction.<span class=\"_ _e\"></span> FOREIGN OPERATIONS A foreign operation is an en<span class=\"_ _2\"></span>tity that is a subsidiary, an ass<span class=\"_ _e\"></span>ociate, an interest in a joint venture or <span class=\"ls78\">a </span>b<span class=\"_ _2\"></span>ranch of the reporting entity whose activities are<span class=\"_ _2\"></span> based or conducted in a count<span class=\"_ _e\"></span>ry or currency other than those of the reporting entity. The financial sta<span class=\"_ _2\"></span>tements of all group entities that have a f<span class=\"_ _e\"></span>unctional currency which differ from the group's presentation currency are translated into<span class=\"_ _2\"></span> the presentation currency as follows:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">assets a<span class=\"_ _2\"></span>nd liabilities are translated at the exchange rate at the reporting date;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">income<span class=\"_ _2\"></span> and expenses are translated at the average exchange rate of the year. </span></span>Exchange d<span class=\"_ _2\"></span>ifferences arising from the translation of the net investment in foreign subsidiaries, i<span class=\"_ _e\"></span>nterests in joint ventures and associates at closing e<span class=\"_ _2\"></span>xchange rates are included in shareholder's e<span class=\"_ _e\"></span>quity under OCI. Upon the (partial) disposal of foreign subsidiaries, joint venture<span class=\"_ _2\"></span>s and associates, (partial) cumulative translation a<span class=\"_ _e\"></span>djustments are recognised in the profit or loss as part of the gain or loss on the sale. 3.3. <span class=\"_ _87\"> </span>Statement of financial position3.3.1 <span class=\"_ _36\"> </span>Property, plant and equipment Owned <span class=\"_ _e\"></span>assets Items of property, plant <span class=\"_ _2\"></span>and equipment a<span class=\"_ _e\"></span>re stated at historical cost (including the directly allocated costs such as finance costs), less accumulated depre<span class=\"_ _2\"></span>ciation and impairment losses (see Se<span class=\"_ _e\"></span>ction 3.3.7. 'Impairment of non-financial assets'). The cost of self-produced assets comprises the cost<span class=\"_ _2\"></span> of materials, direct labour and, where relevant, the initial estimate of the cost<span class=\"_ _2\"></span>s of dismant<span class=\"_ _e\"></span>ling and <span class=\"_ _e\"></span>removing the assets<span class=\"_ _2\"></span> and restoring the site on which the assets wer<span class=\"_ _e\"></span>e located. If parts of an item of property, plant and equipment have different useful lives, t<span class=\"_ _2\"></span>hey are accounted for as separate items of property, plant and equipment.<span class=\"_ _e\"></span> Borrowing c<span class=\"_ _2\"></span>osts that are directly attributable to the construction of the qualifying asset are capitalis<span class=\"_ _e\"></span>ed as part of the cost of <span class=\"_ _2\"></span>that asset. <span class=\"_ _e\"></span> Subsequen<span class=\"_ _e\"></span>t costs The Group recognises in t<span class=\"_ _2\"></span>he carrying amount of an item of property, plant and equipment the subsequent costs of replacing par<span class=\"_ _e\"></span>t of such an item when that cost<span class=\"_ _2\"></span> is incurred, but only when it is pro<span class=\"_ _e\"></span>bable that the future economic benefit<span class=\"_ _2\"></span>s embodied in the item w<span class=\"_ _e\"></span>ill flow to the Group and t<span class=\"_ _2\"></span>he cost of the item can be measured reliably. All other costs, such as repair and maintenance costs, are recognised in <span class=\"_ _e\"></span>profit or loss as and when th<span class=\"_ _2\"></span>ey are incurred.<span class=\"_ _e\"></span> Depr<span class=\"_ _e\"></span>eciation Depreciation is re<span class=\"_ _2\"></span>cognised in profit or loss on a straight-li<span class=\"_ _e\"></span>ne basis over the estimated useful life of each component of an item of property, plant and eq<span class=\"_ _2\"></span>uipment. Land is not depreciated. The applied depreciation percentages can be found in the <span class=\"_ _e\"></span>bullet points below. Depreciation me<span class=\"_ _2\"></span>thods, remaining useful lives a<span class=\"_ _e\"></span>nd residual values of property, p<span class=\"_ _2\"></span>lant and equipment are reassessed annually and are prospe<span class=\"_ _2\"></span>ctively adjusted as the occasion arises.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Administr<span class=\"_ _2\"></span>ative buildings <span class=\"_ _20\"></span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>1.67 <span class=\"ff42\">\u2013</span> 2.00%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Indu<span class=\"_ _2\"></span>strial buildings <span class=\"_ _14d\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>2.00 <span class=\"ff42\">\u2013</span> 4.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Overh<span class=\"_ _2\"></span>ead lines <span class=\"_ _a6\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>2.00 <span class=\"ff42\">\u2013</span> 4.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Under<span class=\"_ _2\"></span>ground cables <span class=\"_ _62\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>2.00 <span class=\"ff42\">\u2013</span> 5.00%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Substatio<span class=\"_ _2\"></span>ns (facilities and machines) <span class=\"_ _a2\"> </span> <span class=\"_ _121\"> </span>2.50 <span class=\"ff42\">\u2013</span> 6.67% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Remote<span class=\"_ _2\"></span> control <span class=\"_ _13e\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span>3.00 <span class=\"ff42\">\u2013</span> 12.50<span class=\"_ _2\"></span>%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Dispatchin<span class=\"_ _2\"></span>g <span class=\"_ _7b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>4.00 <span class=\"ff42\">\u2013</span> 10.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Other<span class=\"_ _2\"></span> PPE (fitting out rented buildings)<span class=\"_ _e\"></span> <span class=\"_ _235\"> </span> <span class=\"_ _121\"> </span>contr<span class=\"_ _2\"></span>actual period </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Vehicles <span class=\"_ _139\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span>6.67 <span class=\"ff42\">\u2013<span class=\"_ _2\"></span><span class=\"ff3f\"> 20.00% </span></span></span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Too<span class=\"_ _2\"></span>ls and office furniture <span class=\"_ _12\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>6.67 <span class=\"ff42\">\u2013</span> 20.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Hardwa<span class=\"_ _2\"></span>re <span class=\"_ _14b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>25.00 <span class=\"ff42\">\u2013</span> 33.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Right o<span class=\"_ _2\"></span>f use assets <span class=\"_ _14e\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>contractual period </span></span>Decommi<span class=\"_ _e\"></span>ssioning an <span class=\"lsff\">asset</span> In accordance<span class=\"_ _2\"></span> with IAS 16, when the entity has a present,<span class=\"_ _e\"></span> legal or<span class=\"_ _2\"></span> constructive obligation to dismantle the item or restore t<span class=\"_ _e\"></span>he site, the initial cost of <span class=\"_ _2\"></span>the item of property, plant and equipment includes an initial estimate of the costs of dismantling and <span class=\"_ _e\"></span>removing the item and restoring the<span class=\"_ _2\"></span> site on which it is located. A corresponding provision for this obligation is recorded for the amount of the as<span class=\"_ _e\"></span>set component (the d<span class=\"_ _2\"></span>ismantling asset) and depreciated over <span class=\"_ _e\"></span>the asset's entire useful life (see also 3.3.13 Provisions).<span class=\"_ _e\"></span> Derecognition An asset is no<span class=\"_ _2\"></span> longer recognised when it is s<span class=\"_ _e\"></span>ubject to disposal or when no future economic benefits are expected from its u<span class=\"_ _2\"></span>se or disposal. Ga<span class=\"_ _2\"></span>ins or losses arising from the derecognition of the asset (determined as the difference b<span class=\"_ _e\"></span>etween the net disposal proceeds and the carr<span class=\"_ _2\"></span>ying amount of the asset) are included in profit or loss, under other income<span class=\"_ _e\"></span> or other expenses, during the year in which the asset was derecognised. <span class=\"fs11\"> </span>3.3.2 <span class=\"_ _36\"> </span>Intangible assets Computer software Software licen<span class=\"_ _2\"></span>ces acquired by the group are stated at cost, less accumulated amortisation (see below) and impairment losses (see Section 3.3.7. 'Impairmen<span class=\"_ _2\"></span>t'<span class=\"ls8f\">).<span class=\"_ _e\"></span></span> Expenditur<span class=\"_ _2\"></span>e <span class=\"ls5b\">on <span class=\"_ _e\"></span></span>research activities undertaken with the purpose of developing software within the group is recognised in profit or loss as it is incurred. Expenditure<span class=\"_ _2\"></span> related to the d<span class=\"_ _e\"></span>evelopment phase of software developed within the group is capitalised if:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the co<span class=\"_ _2\"></span>sts of development can be measured reliably;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the so<span class=\"_ _2\"></span>ftware is technically and commercially feasible and future economic benefits are probable;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the g<span class=\"_ _2\"></span>roup plans <span class=\"ff42\">\u2013</span> and has sufficient resources <span class=\"ff42\">\u2013</span> to complete development;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the g<span class=\"_ _2\"></span>roup plans to use the software. </span></span>The capitalised e<span class=\"_ _2\"></span>xpenditure includes t<span class=\"_ _e\"></span>he cost of material, direct labour<span class=\"_ _2\"></span> costs and overhead costs that are directly attributable to preparing t<span class=\"_ _2\"></span>he software for its use. Other costs are recognised in profit or loss as they are incurred. Licen<span class=\"_ _e\"></span>ces, patents and similar rights<span class=\"_ _2\"></span> Expenditur<span class=\"_ _2\"></span>e on acquired licences, patents, trademarks an<span class=\"_ _e\"></span>d similar r<span class=\"_ _2\"></span>ights are capitalised and amortised on a straight<span class=\"_ _20\"></span>-line b<span class=\"_ _2\"></span>asis over the contractual period, <span class=\"_ _2\"></span>if any, or the estimated useful life.<span class=\"_ _e\"></span> Subsequen<span class=\"_ _e\"></span>t expenditu<span class=\"_ _2\"></span>re Subsequent expenditure on capitalised intang<span class=\"_ _2\"></span>ible assets is capitalised only when it increases the future economic benefits embodied in the specific a<span class=\"_ _2\"></span>sset to which it relates. All other expenditure is recognised in profit or loss as it<span class=\"_ _e\"></span> is incurred. Amortisation Amortisation<span class=\"_ _2\"></span> is recognised in profit or loss on a straight-li<span class=\"_ _e\"></span>ne basis over the estimated useful life of intangible assets, unless the useful life is indefinite<span class=\"_ _2\"></span>. Goodwill and intangible assets with indefinite useful lives are tested systematically for impairment on e<span class=\"_ _e\"></span>ach end of the repor<span class=\"_ _2\"></span>ting period. Software is amortised from the date it b<span class=\"_ _e\"></span>ecomes available for use. The estimated useful lives are as follows: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Licence<span class=\"_ _2\"></span>s <span class=\"_ _13b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>20.00%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Concessio<span class=\"_ _2\"></span>ns <span class=\"_ _59\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>contractual period </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Compu<span class=\"_ _2\"></span>ter software <span class=\"_ _13b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span><span class=\"ls1d\">   </span>20.00 <span class=\"ff42\">\u2013</span> 25.00% </span></span>Depreciation me<span class=\"_ _2\"></span>thods, remaining useful lives and residual<span class=\"_ _e\"></span> values of <span class=\"_ _2\"></span>intangible assets are reassessed annually and are prospectively adjusted as the<span class=\"_ _2\"></span> occasion arises.<span class=\"_ _e\"></span> Derecognition An intangible<span class=\"_ _2\"></span> asset is derecognised upon disposal (i.e., the date <span class=\"_ _e\"></span>upon which the recipient obtains control of it) or wh<span class=\"_ _e\"></span>en no future econom<span class=\"_ _2\"></span>ic benefits are expected from its use or disposal. Any gain or loss arising upon derecognition of the asset (calculated as the differen<span class=\"_ _2\"></span>ce between the net disposal proceeds and the carrying amount of the asset) is included in the statement of profit or <span class=\"_ _e\"></span>loss. 3.3.3 <span class=\"_ _36\"> </span>Goodwill Goodwill is state<span class=\"_ _2\"></span>d at cost, less accumulated impairment l<span class=\"_ _e\"></span>osses. Goodwill is allocated to cash-generating units and is not amortised but is tested annua<span class=\"_ _2\"></span>lly for impairment (see Section <span class=\"_ _e\"></span>3.3.7 'Impairment of non-financial assets'). In the case of associates, the carrying amount of good<span class=\"_ _2\"></span>will is included in the carrying amount of the invest<span class=\"_ _e\"></span>ment in the a<span class=\"_ _2\"></span>ssociates.<span class=\"_ _e\"></span> 3.3.4 <span class=\"_ _36\"> </span>Trade and other receivables Contract assets<span class=\"fc1b\"> </span>Revenue arising from<span class=\"_ _2\"></span> third party services (see Note 3.4.<span class=\"_ _e\"></span>1) and associated costs are recognised over time as we ha<span class=\"_ _e\"></span>ve the right to consideration for wor<span class=\"_ _2\"></span>k performed but not billed. Prog<span class=\"_ _e\"></span>ress is determ<span class=\"_ _2\"></span>ined based on the costs incurred.<span class=\"_ _e\"></span> The contract<span class=\"_ _2\"></span> assets primarily relate to the g<span class=\"ff42\">r<span class=\"_ _e\"></span>oup\u2019s rights to consideration for work completed<span class=\"_ _2\"></span> but not billed at the reporting dat<span class=\"ff3f\">e <span class=\"_ _e\"></span>on </span></span>project work. The con<span class=\"_ _2\"></span>tract assets are transferred to receiv<span class=\"_ _e\"></span>ables when<span class=\"_ _2\"></span> the rights become unconditional. This usually occurs wh<span class=\"_ _e\"></span>en the group<span class=\"_ _2\"></span> issues an invoice to the customer. Contract assets <span class=\"_ _e\"></span>are included in trade and other receivables. Levies In its role<span class=\"_ _2\"></span> as T<span class=\"ls27\">SO<span class=\"ff42 ls1c\">\u2019s</span></span>, Elia Transmission Belgium SA/NV and 50Hertz Transmission<span class=\"_ _2\"></span> GmbH are<span class=\"_ _e\"></span> subject to various public service obligation<span class=\"_ _2\"></span>s imposed by the<span class=\"ls1c\">ir</span> respective governments and/<span class=\"_ _e\"></span>or by regulation mechanisms. These identify public service obligations in various areas (such as promoting the u<span class=\"_ _2\"></span>se of <span class=\"_ _e\"></span>renewable energy, social sup<span class=\"_ _2\"></span>port, fees for the use of the public domain, offshore liabilities<span class=\"_ _e\"></span><span class=\"ls8f\">) </span>that should be<span class=\"_ _2\"></span> fulfilled by TSO<span class=\"ff42\">\u2019</span>s. The costs incurred by T<span class=\"_ _e\"></span>SOs as they undertake these obligations are fully covered by th<span class=\"ff42\">e tariff \u2018levies\u2019 </span>appro<span class=\"_ _2\"></span>ved by the regulators in Belgium and Germany. <span class=\"_ _e\"></span>The amounts outs<span class=\"_ _2\"></span>tanding (deficit<span class=\"_ _e\"></span>) are reported as a trade and other receivables.  Throughout this process<span class=\"ls1d\">, </span>as <span class=\"ff42\">the TSO\u2019s</span> are agents, the Group opted for a net presentation both at profit or loss and at balance sheet level. The<span class=\"_ _2\"></span>se transactions are fully <span class=\"ff42\">\u201cpassed through\u201d</span>.<span class=\"_ _e\"></span> See also N<span class=\"ls5b\">ot</span>e 9.1.<span class=\"ls5b\">4.</span> Trade and other receivables<span class=\"fc1b\"> </span>Trade rece<span class=\"_ _2\"></span>ivables and other receivables are measured at <span class=\"_ _e\"></span>amortised cost minus the appropriate allowance for amounts regarded as unreco<span class=\"_ _2\"></span>verable.<span class=\"_ _e\"></span> Impairment For trade<span class=\"_ _2\"></span> receivables and contract assets, the group a<span class=\"_ _e\"></span>pplies a simplified approach when calculating the Expected Credit Losses (ECLs). The impairment model is based on th<span class=\"_ _2\"></span>e expected credit lo<span class=\"_ _e\"></span>ss model. An individual approach is used for customer<span class=\"_ _2\"></span>s a<span class=\"_ _e\"></span>nd other counterpartie<span class=\"_ _2\"></span>s, for which the change in credit risk is monitored on an individual basis.<span class=\"_ _e\"></span> See N<span class=\"ls5b\">ot</span><span class=\"ff42\">e 8.1 \u2018Credit risk\u2019, for a detailed description of the model</span>.<span class=\"fs11\"> </span>3.3.5 <span class=\"_ _36\"> </span>Inventories Inventories (spare parts) ar<span class=\"_ _2\"></span>e stated at the lower of cost and net realisable value. Net realisable value is the estimated sel<span class=\"_ _e\"></span>ling price min<span class=\"_ _e\"></span>us the estimated c<span class=\"_ _2\"></span>osts of completion and selling expenses. <span class=\"_ _e\"></span>The cost of inventor<span class=\"_ _2\"></span>ies is based on the weighted<span class=\"_ _e\"></span>-average<span class=\"_ _e\"></span>-cost-price me<span class=\"_ _2\"></span>thod. The co<span class=\"_ _2\"></span>st includes the expenditure incurred in acquiring the inventories and the direct costs of <span class=\"_ _e\"></span>bringing them to their location and making them opera<span class=\"_ _2\"></span>tional.<span class=\"_ _e\"></span> Write-down<span class=\"_ _2\"></span>s of inventories to net realisable value are recognised in the period i<span class=\"_ _e\"></span>n which the write-offs occurred.<span class=\"fs11\"> </span>3.3.6 <span class=\"_ _36\"> </span>Cash and cash equivalents Cash and cash equivalen<span class=\"_ _2\"></span>ts comprise cash balances, bank balances, commercial paper and deposits that can be withdra<span class=\"_ _2\"></span>wn on deman<span class=\"_ _e\"></span>d. Overdrafts that ar<span class=\"_ _2\"></span>e repayable on demand for<span class=\"_ _e\"></span>m an integral part of the group's cash management <span class=\"ls5b\">and <span class=\"_ _e\"></span></span>are included as a component of cash and<span class=\"_ _2\"></span> cash equivalents for the purpose of the statement of cash flows.<span class=\"_ _e\"></span><span class=\"fs11\"> </span>3.3.7 <span class=\"_ _36\"> </span>Impairment of non-fin<span class=\"_ _e\"></span>ancial assets The carrying<span class=\"_ _2\"></span> amount of the group's assets, excluding inve<span class=\"_ _e\"></span>ntories and deferred taxes, <span class=\"ls1c\">is</span> reviewed at the end of the reporting period for each asse<span class=\"_ _2\"></span>t to determine whether there is any indication of impairment. If any such indication exists, the recoverable amount <span class=\"_ _e\"></span>of the asset is estimated. The recoverable amou<span class=\"_ _2\"></span>nt of goodwill and intangible assets wi<span class=\"_ _e\"></span>th an indefinite u<span class=\"_ _2\"></span>seful life and intangible assets that are not yet<span class=\"_ _e\"></span> available for use is estimated a<span class=\"_ _2\"></span>t the end of each reporting period.<span class=\"_ _e\"></span> An impairment loss <span class=\"_ _2\"></span>is recognised whenever the carrying amount <span class=\"_ _e\"></span>of such <span class=\"ls5b\">an </span>asset o<span class=\"_ _e\"></span>r its cash-generating unit exceeds its recoverable amoun<span class=\"_ _2\"></span>t. Impairment losses are recognised in profit or loss. Recognised impairment losses relating to cash<span class=\"_ _e\"></span>-generating units are allocated f<span class=\"_ _2\"></span>irst to reduce the carrying amount of any goodwil<span class=\"_ _e\"></span>l allocated to cash-generating units and then to redu<span class=\"_ _2\"></span>ce <span class=\"_ _e\"></span>the carrying amount of the other<span class=\"_ _2\"></span> assets in the units on a pro-rata basis.<span class=\"_ _e\"></span> After recognition<span class=\"_ _2\"></span> of impairment losses, the depreciation costs for the asset will be p<span class=\"_ _e\"></span>rospectively adjusted. Calculation of the r<span class=\"_ _e\"></span>ecoverable amo<span class=\"_ _2\"></span>unt The recoverable amou<span class=\"_ _2\"></span>nt of intangible assets and property, plant and equipment is determined as the higher of their fair value l<span class=\"_ _e\"></span>ess costs of disposa<span class=\"_ _2\"></span>l <span class=\"ls5b\">and <span class=\"_ _e\"></span></span>their value in use. In assessing value in u<span class=\"_ _e\"></span>se, the e<span class=\"_ _2\"></span>xpected future cash flows are discounted to their <span class=\"_ _e\"></span>presen<span class=\"_ _2\"></span>t value using a pre-tax discount rate t<span class=\"_ _2\"></span>hat reflects both the current market assessment of the time value of money and the risks specific to the asset.<span class=\"_ _e\"></span> Th<span class=\"ls0\">e group's assets do not generate cash flows that are independent from other assets. The recoverable amount is therefore determined<span class=\"_ _2\"></span> </span>for the cash-generating<span class=\"_ _2\"></span> unit (i.e. the entire high<span class=\"_ _e\"></span>-voltage grid) to which the a<span class=\"_ _2\"></span>sset belongs. This is also the level at wh<span class=\"_ _e\"></span>ich the group administers its go<span class=\"_ _2\"></span>odwill and gathers the economic be<span class=\"_ _e\"></span>nefits of acquired goodwill. Reversal<span class=\"_ _e\"></span>s of impai<span class=\"_ _2\"></span>rment An impairment loss with respect <span class=\"ls1d\">to</span> goodwill is not reversed. Impairment loss on<span class=\"_ _2\"></span> other assets is reversed if there have been changes in the estimates u<span class=\"_ _2\"></span>sed to determine the recoverable amount.<span class=\"_ _e\"></span> An impairment loss <span class=\"_ _2\"></span>is reversed only to the extent that the asset's carrying amount does not exceed the carrying am<span class=\"_ _e\"></span>ount that would have been determined<span class=\"_ _2\"></span>, net of depreciation or amortisation, if no <span class=\"_ _e\"></span>impairment loss had been recognised.<span class=\"fs11\"> </span>3.3.8 <span class=\"_ _148\"> </span>Financial assets Initial recognition and measurement The classifica<span class=\"_ _2\"></span>tion of financial assets at i<span class=\"_ _e\"></span>nitial recognition depends on their contractual cash flow characteristics and the g<span class=\"ff42\">roup\u2019s busines</span>s model for managing them. T<span class=\"_ _2\"></span>he group initially measures a <span class=\"_ _e\"></span>financial asset at its fair value plus transaction costs. Su<span class=\"_ _e\"></span>b<span class=\"_ _e\"></span>seq<span class=\"_ _e\"></span>u<span class=\"_ _e\"></span>en<span class=\"_ _e\"></span>t <span class=\"_ _e\"></span>m<span class=\"_ _e\"></span>e<span class=\"_ _e\"></span>asu<span class=\"_ _e\"></span>r<span class=\"_ _e\"></span>em<span class=\"_ _e\"></span>en<span class=\"_ _e\"></span>t<span class=\"ff3f\"> </span>For purpo<span class=\"_ _2\"></span>ses of subsequent measurement, financial assets are classified in three c<span class=\"_ _e\"></span>ategories: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Fina<span class=\"_ _2\"></span>ncial assets at amortised cost (debt instruments)<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Fina<span class=\"_ _2\"></span>ncial assets measured at fair value through OCI (equity instruments)<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Fina<span class=\"_ _2\"></span>ncial assets measured at fair value through profit and loss </span></span>Financial <span class=\"_ _e\"></span>assets at<span class=\"_ _2\"></span> amortised cost Financial a<span class=\"_ _2\"></span>ssets at amortised cost are managed wit<span class=\"_ _e\"></span>h a view to holding them to maturity and collecting<span class=\"_ _2\"></span> contractual cash flows. The financial asse<span class=\"_ _2\"></span>ts give rise to cash flows th<span class=\"_ _e\"></span>at are solely payments of principal and interest on the principal amount outstanding<span class=\"_ _2\"></span>.<span class=\"_ _e\"></span> Financial a<span class=\"_ _2\"></span>ssets at amortised cost are subsequently <span class=\"_ _e\"></span>measured using the Effective Interest Rate (EIR) method and are subject to impairm<span class=\"_ _2\"></span>ent. Gains and losses are recognised in profit or l<span class=\"_ _e\"></span>oss when the asset is derecogn<span class=\"_ _2\"></span>ised, modified or impaired.<span class=\"_ _e\"></span> The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s financial assets at amortised cost i<span class=\"ff3f\">nclude l<span class=\"_ _e\"></span>oans to third parties. </span></span>Financial <span class=\"_ _e\"></span>assets measured at fair value through OCI (equity instruments FVOCI) Upon initial recogn<span class=\"_ _2\"></span>ition, the group irrevocably classifies it<span class=\"_ _e\"></span>s equity inve<span class=\"_ _2\"></span>stments as equity instruments <span class=\"_ _e\"></span>measured at fair value through OCI when the<span class=\"_ _2\"></span> group does not have significant influence and th<span class=\"_ _e\"></span>e assets are not held for trading. <span class=\"ls7c\">Th<span class=\"ls1c\">is</span></span> cl<span class=\"_ _e\"></span>assification is determined on an instrument-<span class=\"ls5b\">by</span>-instrument basis. Gains and<span class=\"_ _2\"></span> losses on these financial assets are never recycl<span class=\"_ _e\"></span>ed to profit or loss. Dividends are recognised as other income in the statement of <span class=\"_ _2\"></span>profit or loss when the right of payment has been established, except when the g<span class=\"_ _e\"></span>roup benefits from such proceeds as a recover<span class=\"_ _2\"></span>y of part of the cost of the financial asset, in which<span class=\"_ _e\"></span> case <span class=\"ls5b\">any</span> such gains are recorded in OCI. Equity instruments me<span class=\"_ _e\"></span>asured at fair value through OCI are no<span class=\"_ _2\"></span>t subject to impairment assessment. <span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> has elected to irrevocably classify <span class=\"_ _e\"></span><span class=\"ls5b\">non</span>-listed equity investments over which the group does not have significant influence in this category.  Financial <span class=\"_ _e\"></span>assets mea<span class=\"_ _2\"></span>sured at fair value through profit and loss<span class=\"_ _e\"></span> (FVTPL) All financial assets not cla<span class=\"_ _2\"></span>ssified as measured at amortised cost or FVOCI as described above are measured at FVTPL<span class=\"_ _e\"></span> Impairmen<span class=\"_ _e\"></span>t of financ<span class=\"_ _2\"></span>ial assets<span class=\"ff3f\"> </span>The group<span class=\"_ _2\"></span> recognises an allowance for expected credit losses (ECLs) for its debt instruments.<span class=\"_ _e\"></span> See Note 8.1 <span class=\"ff42\">\u2018</span>Credit risk<span class=\"ff42 ls1c\">\u2019,</span> for a detailed description of the ap<span class=\"_ _2\"></span>proach<span class=\"_ _e\"></span> 3.3.9 <span class=\"_ _36\"> </span>Derivative financial instruments and hedg<span class=\"_ _e\"></span>e accounting Deri<span class=\"_ _e\"></span>vative financia<span class=\"_ _2\"></span>l instruments The group<span class=\"_ _2\"></span> sometimes uses derivative financial instruments to hedge its exposure to foreign exchange, interest rat<span class=\"_ _e\"></span>e and commodity prices risks arising from oper<span class=\"_ _2\"></span>ating, financing and investment activities. In accordance with its treasury policy, the gr<span class=\"_ _e\"></span>oup neither holds nor issues der<span class=\"_ _2\"></span>ivative financial instruments for trading purposes. However, derivatives that do not qualify for hedge accounti<span class=\"_ _e\"></span>ng are accounted for as in<span class=\"_ _2\"></span>struments held for trading purposes.<span class=\"_ _e\"></span> Derivative fin<span class=\"_ _2\"></span>ancial instruments are initially rec<span class=\"_ _e\"></span>ognised at fair value. Any gain or loss resulting from changes in the fair valu<span class=\"_ _2\"></span>e is immediately boo<span class=\"_ _2\"></span>ked in the statement of profit or loss. Wh<span class=\"_ _e\"></span>ere derivative financial instruments qualify for<span class=\"_ _2\"></span> hedge accounting, the reflection of any resulting<span class=\"_ _2\"></span> gain or loss depends on the nature of the <span class=\"_ _e\"></span>item being hedged. The fa<span class=\"_ _2\"></span>ir value of interest <span class=\"_ _e\"></span>rate swaps is the estimated amount that the group would receive or pay to terminate the swap at the end of the repor<span class=\"_ _2\"></span>ting period, taking into account the current interest rates and the current creditworthiness of t<span class=\"_ _e\"></span>he swap counterparties and the group<span class=\"_ _2\"></span>. The fair value of forward exchange contracts is the<span class=\"_ _e\"></span>ir quoted market price at the end of the reporting period, i.e. the present value of the quoted for<span class=\"_ _2\"></span>ward price.<span class=\"_ _e\"></span> Deri<span class=\"_ _e\"></span>vatives used as <span class=\"_ _2\"></span>hedging instruments Cash flow hedges Changes in<span class=\"_ _2\"></span> the fair value of the derivative hedging instrument designated as a cash-flow hedge a<span class=\"_ _e\"></span>re recognised directly in OCI to the extent that the hedge is e<span class=\"_ _2\"></span>ffective. If the hedge is ineffective, changes in fair value are recognised in profit or loss.<span class=\"_ _e\"></span> Th<span class=\"ls0\">e group uses forward currency contracts as hedges of its exposure to foreign currency risk in forecast transactions and firm </span>commitments, a<span class=\"_ _2\"></span>s well as forward commodity contracts for its exposure to volatility in the commodity prices. <span class=\"_ _e\"></span>The group designates only the spot element of <span class=\"_ _2\"></span>forward contracts as a hedged risk. The forward element is considered the cost of hedging and is<span class=\"_ _e\"></span> recognised in OCI and accumulated in a<span class=\"_ _2\"></span> separate component of the stateme<span class=\"_ _e\"></span>nt of financial position under hedging reserves. If the hedging instrumen<span class=\"_ _2\"></span>t no longer meets the criteria for hedge accounting, expires or is sold, terminated or exercised, hedge accounting is pro<span class=\"_ _2\"></span>spectively discontinued. The cumulative gain or loss previously recognised in OCI remains there until the fo<span class=\"_ _e\"></span>recast transact<span class=\"_ _2\"></span>ion occurs. When the hedged item is a non-fina<span class=\"_ _e\"></span>ncial asset, the amount recognised in OCI is transferred, where justified, to the carrying<span class=\"_ _2\"></span> amount of the asset. In other cases, the amount <span class=\"_ _e\"></span>recogn<span class=\"_ _2\"></span>ised in OCI is transferred to profit or loss in the same peri<span class=\"_ _e\"></span>od that the hedged item affects <span class=\"_ _2\"></span>profit or loss.<span class=\"_ _e\"></span> When a derivative or h<span class=\"_ _2\"></span>edge relationship is terminated, cumulative gains or losses still remain in OCI, provided that <span class=\"_ _e\"></span>the hedged transact<span class=\"_ _2\"></span>ion is still expected to occur. If the hedged transaction is no longer expected to take place, the cumulative unrealised gain or loss is remo<span class=\"_ _2\"></span>ved from OCI and is immediately recognised in profit or loss. The group<span class=\"_ _2\"></span> recognises derivatives to hedge the price for the future procurement of the physical requirement for grid losses t<span class=\"_ _e\"></span>hat is expected<span class=\"_ _2\"></span> in subsequent periods and is covered in each case by short-term procurement transactions on the spot <span class=\"_ _e\"></span>market.<span class=\"_ _2\"></span> These derivatives are measured at fair<span class=\"_ _2\"></span> value in OCI with no effect on profit or loss as part of cash flow hedge accounting; they se<span class=\"_ _e\"></span>rve as price hedging<span class=\"_ _2\"></span> of the physical demand for electrical energy to cover grid losses (underlying transaction). Due to the availability a<span class=\"_ _e\"></span>nd liquidity of future<span class=\"_ _2\"></span>s trading, the hedging period for intended price hedging covers a period of up to two years from the balance <span class=\"_ _e\"></span>sheet date. In this context, the group<span class=\"_ _2\"></span> pursues a conservative hedging strategy oriented towards the regulatory framework and the ability to roll over the electricity procur<span class=\"_ _2\"></span>ement costs incurred, which enables timely and predictable price hedgin<span class=\"_ _e\"></span>g.  The cr<span class=\"_ _2\"></span>itical term match method measures effectiveness. If the valuation-<span class=\"_ _e\"></span>relevant parameters of the hedged item and hedging instrument match, it <span class=\"_ _2\"></span>is assumed that an effective hedging relationship exists and that changes in value from both items <span class=\"_ _e\"></span>offset each other. The group strives for<span class=\"_ _2\"></span> full price hedging of the expected volume of grid loss energy (hedge ratio 1:1).<span class=\"_ _20\"></span> Hedging o<span class=\"_ _2\"></span>f monetary assets and liabilities<span class=\"_ _e\"></span> Hedge accounting is not applied<span class=\"_ _2\"></span> to derivative instruments that economically hedge monetary assets and liabilities denominated<span class=\"_ _e\"></span> in foreign<span class=\"_ _2\"></span> currencies. Changes in the fair value of such deriv<span class=\"_ _e\"></span>atives are recognised in profit or lo<span class=\"_ _2\"></span>ss <span class=\"_ _e\"></span><span class=\"ls5b\">as</span> fo<span class=\"_ _e\"></span>reign currency gains and losses. <span class=\"_ _b6\"> </span>3.3.10 <span class=\"_ _1dd\"> </span>Equity Share <span class=\"_ _e\"></span>capital <span class=\"ff43\">\u2013</span> transaction costs Transa<span class=\"_ _2\"></span>ction costs related to the issuing of capital are ded<span class=\"_ _e\"></span>ucted from the capital received. Share <span class=\"_ _e\"></span>capital <span class=\"ff43\">\u2013</span> share-based pay<span class=\"_ _2\"></span>ment expenses Share-based payment expenses are a<span class=\"_ _2\"></span>dded to the capital receiv<span class=\"ls5b\">ed.<span class=\"_ _e\"></span></span> Dividends Dividends are re<span class=\"_ _2\"></span>cognised as a liability in the period in which they are decl<span class=\"_ _e\"></span>ared (see note 6.12<span class=\"ls95\">.1<span class=\"_ _2\"></span><span class=\"ls0\">). </span></span>Hybrid securitiesHybrid securities are de<span class=\"_ _2\"></span>eply subordinated securities. With the exception of ordinary shares, hybrid securities rank as the mos<span class=\"_ _e\"></span>t junior instruments in t<span class=\"_ _2\"></span>he capital structure of the gro<span class=\"_ _e\"></span>up in an insolvency hierarchy. Hybrid securities are perpe<span class=\"_ _2\"></span>tual instruments<span class=\"_ _e\"></span> and do not default on non-payment of coupons (unless <span class=\"_ _2\"></span>such payment was mandatory following a resolution or payment of a dividend to ordinary shareholder<span class=\"_ _2\"></span>s).<span class=\"_ _e\"></span> The holder<span class=\"_ _2\"></span>s of hybrid securities have limited influence <span class=\"ls5b\">on <span class=\"_ _e\"></span></span>the outcome of a bankruptcy proceeding or restructuring outside bankruptcy. Consequently, the holders cannot oblige the group to pay distributions or redeem the securities in part or in f<span class=\"_ _2\"></span>ull. Payment of distributions on and<span class=\"_ _2\"></span> redemption of the securities is at our sole discretion.<span class=\"_ _e\"></span> In light of their characteristics, hybrid securities are classified as an equity instrument under IFRS. T<span class=\"_ _2\"></span>he associated issue costs are recognised directly in retained earnings.<span class=\"_ _e\"></span> Treasury shares When <span class=\"_ _e\"></span>shares <span class=\"_ _e\"></span>recognised <span class=\"_ _20\"></span>as <span class=\"_ _e\"></span>equity <span class=\"_ _20\"></span>are <span class=\"_ _e\"></span>repurchased, <span class=\"_ _e\"></span>the<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>amou<span class=\"_ _2\"></span>nt <span class=\"_ _e\"></span>of <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>conside<span class=\"_ _20\"></span>ratio<span class=\"_ _2\"></span>n <span class=\"_ _20\"></span>pa<span class=\"_ _2\"></span>id, <span class=\"_ _20\"></span>which inclu<span class=\"_ _e\"></span>des <span class=\"_ _e\"></span>directly<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>attributable <span class=\"_ _20\"></span>costs, is<span class=\"_ _e\"></span> recogn<span class=\"_ _2\"></span>ised <span class=\"_ _e\"></span>as <span class=\"_ _20\"></span>a <span class=\"_ _e\"></span>change <span class=\"_ _e\"></span>in <span class=\"_ _20\"></span>equity. Re<span class=\"_ _e\"></span>purchased <span class=\"_ _e\"></span>shares <span class=\"_ _20\"></span>are classified <span class=\"_ _20\"></span>as <span class=\"_ _e\"></span>treasury <span class=\"_ _e\"></span>shares <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>nd <span class=\"_ _e\"></span>are<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>deducted <span class=\"_ _e\"></span>f<span class=\"_ _e\"></span>rom <span class=\"_ _e\"></span>equity. <span class=\"_ _e\"></span>The <span class=\"_ _e\"></span>am<span class=\"_ _e\"></span>ount <span class=\"_ _e\"></span>of<span class=\"_ _e\"></span> treasur<span class=\"_ _2\"></span>y <span class=\"_ _20\"></span>shares <span class=\"_ _20\"></span>held <span class=\"_ _20\"></span>is <span class=\"_ _20\"></span>disclos<span class=\"_ _e\"></span>ed <span class=\"_ _20\"></span>in <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>treasury <span class=\"_ _20\"></span>share <span class=\"_ _20\"></span>reserve. <span class=\"_ _20\"></span>When <span class=\"_ _20\"></span>treasury <span class=\"_ _20\"></span>shares <span class=\"_ _20\"></span>are <span class=\"_ _20\"></span>subsequently<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>sold <span class=\"_ _20\"></span>or <span class=\"_ _20\"></span>reissued, <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>amount received <span class=\"_ _4b\"></span>is recognised <span class=\"_ _4b\"></span>as an <span class=\"_ _2\"></span>incre<span class=\"_ _2\"></span>ase <span class=\"_ _2\"></span>in <span class=\"_ _2\"></span>equity a<span class=\"_ _2\"></span>nd <span class=\"_ _2\"></span>the <span class=\"_ _4b\"></span>r<span class=\"_ _e\"></span>esulting <span class=\"_ _2\"></span>surplus <span class=\"_ _2\"></span>or <span class=\"_ _2\"></span>deficit <span class=\"_ _4b\"></span>o<span class=\"_ _e\"></span>n <span class=\"_ _2\"></span>the <span class=\"_ _4b\"></span>t<span class=\"_ _e\"></span>ransaction is <span class=\"_ _4b\"></span>presented within <span class=\"_ _4b\"></span>r<span class=\"_ _20\"></span>etained <span class=\"_ _4b\"></span>e<span class=\"_ _e\"></span>arnings. No gain or loss is r<span class=\"_ _2\"></span>ecognised in profit or loss on<span class=\"_ _e\"></span> the purchase, sale, <span class=\"_ _2\"></span>issue or cancellation of treasury shares.<span class=\"_ _e\"></span> Share-b<span class=\"_ _e\"></span>ased pay<span class=\"_ _2\"></span>ments The co<span class=\"_ _2\"></span>st of share-based payment transactions is reflecte<span class=\"_ _e\"></span>d in the in<span class=\"_ _2\"></span>come statement. The stock options are valued at grant date, based on the share<span class=\"_ _2\"></span> price at grant date, business evolution, exercise price and interest rates. Stock option plan cost is taken into result on a straight-<span class=\"_ _2\"></span>line basis from the grant date until the end of the vesting period.<span class=\"_ _e\"></span> 3.3.11 <span class=\"_ _1dd\"> </span>Financial <span class=\"_ _e\"></span>liabilities Financial lia<span class=\"_ _2\"></span>bilities consist of interest-b<span class=\"_ _e\"></span>earing loans and borro<span class=\"_ _2\"></span>wings in the group. They are initially r<span class=\"_ _e\"></span>ecognised at fair value, less related transact<span class=\"_ _2\"></span>ion costs. Subsequent to initial recognition, interest<span class=\"_ _e\"></span>-bearing loans and borrowings are stated at amortised c<span class=\"_ _e\"></span>ost price with any differen<span class=\"_ _2\"></span>ce between amount at initial recognition a<span class=\"_ _e\"></span>nd redemption value being recognised in profit or loss over the period of the loans on an effe<span class=\"_ _2\"></span>ctive interest basis. A financial liability is d<span class=\"_ _2\"></span>erecognised when the obligati<span class=\"_ _e\"></span>on under the liability is disch<span class=\"_ _2\"></span>arged or cancelled or expires. When an existing financial liability is replace<span class=\"_ _2\"></span>d by another from the same lender on substantially different terms, or the terms of an existing<span class=\"_ _e\"></span> liability are substantia<span class=\"_ _2\"></span>lly modified, such an exchange or modification i<span class=\"_ _e\"></span>s treated as the derecognition of the original liability and the recognition of a new liability. T<span class=\"_ _2\"></span>he difference in the respective carrying amounts is recognised in th<span class=\"_ _e\"></span>e statement of profit or loss. Financial a<span class=\"_ _2\"></span>ssets and financial liabilities are offset and the net amount is reported in the consolidated statement of financial position if there is a currently enfor<span class=\"_ _2\"></span>ceable legal right to offset the rec<span class=\"_ _e\"></span>ognised amounts and there is an inten<span class=\"_ _2\"></span>tion to settle on a net ba<span class=\"_ _e\"></span>sis, to realise the assets<span class=\"_ _2\"></span> and settle the liabilities simultaneously.<span class=\"_ _e\"></span> 3.3.12 <span class=\"_ _24f\"> </span>Employee benefits Defin<span class=\"_ _e\"></span>ed-contri<span class=\"_ _2\"></span>bution plans In Belgium, <span class=\"_ _2\"></span>contribution based promises, called defined-c<span class=\"_ _e\"></span>ontribution pension plans under Belgian pension legislatio<span class=\"_ _e\"></span>n, are c<span class=\"_ _2\"></span>lassified as defined-benefit plans for accounting purpose<span class=\"_ _2\"></span>s due to the legal minimum return to be guaranteed by the employer. <span class=\"_ _e\"></span> Before 1 <span class=\"_ _2\"></span>January 2016, the legal minimum return was 3.75%<span class=\"_ _e\"></span> on emp<span class=\"_ _2\"></span>loyee contributions, 3.25% on employe<span class=\"_ _e\"></span>r contributions and 0% for inactive plan<span class=\"_ _2\"></span> participants<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> From<span class=\"_ _2\"></span> 1 January 2016 onwards, the legal minimum return <span class=\"_ _e\"></span>is a variab<span class=\"_ _2\"></span>le rate between 1.75% and 3.75%. T<span class=\"_ _e\"></span>he interest rate is automatically adapted on <span class=\"ls5b\">1 </span>January each year based on the average return OLO 10 years over 24 months, with 1.75% as a minimum. As of <span class=\"_ _e\"></span>1 Januar<span class=\"_ _2\"></span>y 2016, the legal minimum return is 1.75% on empl<span class=\"_ _e\"></span>oyee and employer<span class=\"_ _2\"></span> co<span class=\"_ _e\"></span>ntributions and 0% for inactive plan participants.<span class=\"_ _e\"></span> As the plans <span class=\"_ _2\"></span>are funded via a pension fund, the vertical approach is applied, meaning that 1.75% is applied on all the reserves (even before 2016). The employer needs to f<span class=\"_ _2\"></span>inance the deficits related to the <span class=\"_ _e\"></span><span class=\"ff42\">\u201cLaw on Supplementary Pensions</span> (LSP) guarantee at any <span class=\"_ _e\"></span>time for the employee contract a<span class=\"_ _2\"></span>nd at the moment the vested reserve<span class=\"_ _e\"></span>s are transferred in case of departure, retirement or liquidation of the pension for the emp<span class=\"_ _2\"></span>loyer contract.<span class=\"_ _e\"></span> For each plan, th<span class=\"_ _2\"></span>e fair value of assets equals the sum of the accrued individual reserves (if any) and the value of the colle<span class=\"_ _e\"></span>ctive fund(s) (if any). The Defined-Benefit Ob<span class=\"_ _2\"></span>ligation (DBO) was determined fol<span class=\"_ _e\"></span>lowing the Pr<span class=\"_ _2\"></span>ojected Unit C<span class=\"_ _e\"></span>redit (PUC) method. The plan formula (backloaded or not) determines whether the premium<span class=\"_ _2\"></span>s are projected. <span class=\"_ _e\"></span> In Germany, the defined-<span class=\"_ _2\"></span>contribution <span class=\"_ _e\"></span>plan comprises a fixed pension to be paid to an employee upon retirement, which is usually based on one<span class=\"_ _2\"></span> or more <span class=\"ff42\">factors such as the employee\u2019s age, years of service and salary.</span>  In both<span class=\"_ _2\"></span> countries, the calculation is performed by an accr<span class=\"_ _e\"></span>edited actuary. Defin<span class=\"_ _e\"></span>ed-benefit <span class=\"_ _2\"></span>plan<span class=\"_ _e\"></span>s For defined-benefit plans, which exist in both Belgium and Germany, the pension expenses for each plan are assessed separately <span class=\"ls5b\">on </span>an annual ba<span class=\"_ _2\"></span>sis by accredited actuaries using the PUC m<span class=\"_ _e\"></span>ethod. The estimated future benefit that emplo<span class=\"_ _2\"></span>yees have <span class=\"_ _e\"></span>earned in return for their ser<span class=\"_ _2\"></span>vice in the current and previous periods is discounted to determine its present value, and the fair value of any plan assets is deducted. T<span class=\"_ _2\"></span>he discount rate is the inte<span class=\"_ _e\"></span>rest rate, at the end of the reporting period, on high quality bonds that have maturity dates appro<span class=\"_ _2\"></span>ximately equivalent <span class=\"ls1d\">to</span> th<span class=\"_ _e\"></span>e terms of the group's obligations and that are denominated in the currency in which the benefits are expected<span class=\"_ _2\"></span> to be paid. When the bene<span class=\"_ _2\"></span>fits of a plan are improved, the portion of the increased benefit relating to past service by employees is reco<span class=\"_ _2\"></span>g<span class=\"_ _e\"></span>nised as an expense in profit or lo<span class=\"_ _2\"></span>ss at the earlier of the following dates:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">when th<span class=\"_ _2\"></span>e plan amendment or curtailment occurs; or<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">when t<span class=\"_ _2\"></span>he entity recognises related restructuring costs under IAS<span class=\"_ _e\"></span> 37 or termination benefits. </span></span>Where the calcula<span class=\"_ _2\"></span>tion results in a benefit to the gr<span class=\"_ _e\"></span>oup, the recognised asset is limited to the present value of any future r<span class=\"_ _2\"></span>efunds from the plan or<span class=\"_ _2\"></span> reductions in future contributions to the plan. <span class=\"_ _e\"></span> Remeasurements <span class=\"ff42\">\u2013</span> comprising actuarial g<span class=\"_ _2\"></span>ains and losse<span class=\"_ _e\"></span>s, the effect of <span class=\"_ _2\"></span>the asset ceiling <span class=\"_ _e\"></span>(excluding amounts included in net interest on the net defined-benefit liab<span class=\"_ _2\"></span>ility<span class=\"_ _e\"></span>) and the return on plan a<span class=\"_ _2\"></span>ssets (excluding amounts included in net<span class=\"_ _e\"></span> interest on the net defined-benefit liability) <span class=\"ff42\">\u2013</span> are re<span class=\"_ _2\"></span>cognised immediately in the statement of financial position with a corresponding debit or credit to retained earnings through OCI in the period in which they occur. Remeasuremen<span class=\"_ _2\"></span>ts are not reclassified to profit or loss in subsequent periods. <span class=\"_ _e\"></span><span class=\"ff40 fs11\"> </span>Reimbur<span class=\"_ _e\"></span>sement rights (Belgium) Reimbursemen<span class=\"_ _2\"></span>t rights are recognised as a separate asset when, and only when, it is virtually certain that another par<span class=\"_ _e\"></span>ty will reimburse some or all of <span class=\"_ _2\"></span>the expenditure required to settle the corresponding benefit obligation. Rei<span class=\"_ _e\"></span>mbursement rights are presented as non-curren<span class=\"_ _2\"></span>t assets under other financial assets and are measured at fair value. <span class=\"_ _e\"></span>These rights are handled the same way as the correspondin<span class=\"_ _2\"></span>g defined-benefit obligation. When <span class=\"_ _e\"></span>the changes in the period result from changes in financial assumptions or from experien<span class=\"_ _2\"></span>ce adjustments or changes in demographic assu<span class=\"_ _e\"></span>mptions, then the asset is adjusted through OCI. The components of the defined-benefit cost are recog<span class=\"_ _2\"></span>nised net of amounts relatin<span class=\"_ _e\"></span>g to changes in the carrying amount o<span class=\"_ _2\"></span>f the rights to reimb<span class=\"_ _e\"></span>ursement.<span class=\"_ _e\"></span> Other long-term <span class=\"_ _e\"></span>employ<span class=\"_ _2\"></span>ee benefits The group<span class=\"_ _2\"></span>'s net obligation regarding long-t<span class=\"_ _e\"></span>erm service benefits other than pension plans is assessed on an annual basis by accredited actuarie<span class=\"_ _2\"></span>s. The net obligation is calculated using the PUC <span class=\"_ _e\"></span>method and is the amount of future benefit that emplo<span class=\"_ _2\"></span>yee<span class=\"_ _e\"></span>s have earned in return for<span class=\"_ _2\"></span> their service in the current and previous periods. The <span class=\"_ _e\"></span>obligation is discounted to its present value, and the fair value of any related<span class=\"_ _2\"></span> assets is deducted. The discount rate is the yield, <span class=\"_ _e\"></span>at the end o<span class=\"_ _2\"></span>f the reporting period<span class=\"_ _e\"></span>, on high quality bonds that have maturity dates appro<span class=\"_ _2\"></span>ximately equivalent to the terms of the g<span class=\"_ _e\"></span>roup's obligations and that are denominated in the currency in which the bene<span class=\"_ _2\"></span>fits are expected<span class=\"_ _2\"></span> to be paid.<span class=\"_ _e\"></span> Short-term <span class=\"_ _e\"></span>employ<span class=\"_ _2\"></span>ee benefits Short-term employe<span class=\"_ _2\"></span>e benefits are measured on an undisc<span class=\"_ _e\"></span>ounted basis and are expensed as the<span class=\"_ _2\"></span> related service is p<span class=\"_ _e\"></span>rovided. A liability is recogn<span class=\"_ _2\"></span>ised for the amount expected to be paid out under a short<span class=\"_ _e\"></span>-term cash bonus or profit-sharing plans if the group has a legal or construct<span class=\"_ _2\"></span>ive obligation to pay this amount as a result of the <span class=\"ff42\">employee\u2019s </span>past service and the obligation c<span class=\"_ _e\"></span>an be reliably estimated.<span class=\"fs11\"> </span>3.3.13 <span class=\"_ _1dd\"> </span>Provisions A provision is recogn<span class=\"_ _2\"></span>ised in the balance sheet when the g<span class=\"_ _e\"></span>roup has a current legal or constructive obligation as a result of a past event and it is likely that an<span class=\"_ _2\"></span> outflow of economic benefits <span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span> of which a reliable estimate can be made <span class=\"ff42\">\u2013</span> will be required to settle the obligation. If the e<span class=\"_ _2\"></span>ffect is material, provisions are determined by discounting the expected future cash flows at a pre<span class=\"_ _e\"></span>-tax rate that reflects the current market assessment of <span class=\"_ _2\"></span>the time value of money and, where appropriate, of the risks specific to the liability.<span class=\"_ _e\"></span> The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s main long<span class=\"ff3f\">-term provisions <span class=\"_ _e\"></span>are provisions for dismantling<span class=\"_ _2\"></span> obligations. The present value of the obligation at the time of </span></span>commissioning re<span class=\"_ _2\"></span>presents the initial amount of the provision for dismantling with, as the counterpart, an asset for the same <span class=\"_ _e\"></span>amount, which is included<span class=\"_ _2\"></span> in the carrying amount of the related pro<span class=\"_ _e\"></span>perty, plant and equipment and is depreciated over the asset'<span class=\"_ _e\"></span>s entire useful life.  Factor<span class=\"_ _2\"></span>s having a significant influence on the amount of provisions include: <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">cost est<span class=\"_ _2\"></span>imates <span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the t<span class=\"_ _2\"></span>iming of expenditure ; and  </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the d<span class=\"_ _2\"></span>iscount rate applied to cash flows. </span></span>These factor<span class=\"_ _2\"></span>s are based on information and estimates de<span class=\"_ _e\"></span>emed b<span class=\"_ _2\"></span>y the g<span class=\"_ _e\"></span>roup to be the most appropriate as of today. If the e<span class=\"_ _2\"></span>ffect of the time value of money is material, provisions are discounted using a current pre-tax rate that reflec<span class=\"_ _e\"></span>ts, when appropriate, the risks specific to the liability. <span class=\"_ _2\"></span>When discounting is used, the increase in the provision due to the passage of time is re<span class=\"_ _e\"></span>cognised as a finance co<span class=\"_ _2\"></span>st.  <span class=\"_ _e\"></span> 3.3.14 <span class=\"_ _1dd\"> </span>Trade and other payables Trade and<span class=\"_ _2\"></span> other payables are stated at amortised cost.<span class=\"_ _e\"></span> Levies<span class=\"fc1b\"> </span>In its role<span class=\"_ _2\"></span> as a TSO, Elia Transmission Belgium SA/NV an<span class=\"_ _e\"></span>d 50Hertz Transmission<span class=\"_ _2\"></span> GmbH are<span class=\"_ _e\"></span> subject to various public service obligation<span class=\"_ _2\"></span>s imposed by the Government and/or by regulation<span class=\"_ _e\"></span> mechanisms. These identify public service obligations in various fields (such as promoting the u<span class=\"_ _2\"></span>se of renewable energy, social s<span class=\"_ _e\"></span>upport, fees for the use of the <span class=\"ls5b\">pu</span>blic domain, offshore liab<span class=\"_ _e\"></span>ility) for fulfilment by TSOs. The<span class=\"_ _2\"></span> costs incurred by TSOs in accordance with th<span class=\"_ _e\"></span>ese obligations are fully co<span class=\"_ _2\"></span>vered by the tariff <span class=\"_ _e\"></span><span class=\"ff42\">\u2018</span>levies<span class=\"ff42\">\u2019</span> approved by the regulator. The amoun<span class=\"_ _2\"></span>ts outstanding (surplus) are reported as a tr<span class=\"_ _e\"></span>ade and other payable.  In this process<span class=\"ls1d\">, </span>as <span class=\"ff42\">the TSO\u2019s </span>are <span class=\"ls5b\">agent</span>s<span class=\"_ _e\"></span>, the group opted for a net presentation both at profit or loss and at ba<span class=\"_ _2\"></span>lanc<span class=\"_ _e\"></span>e sheet level.  These transact<span class=\"_ _2\"></span>ions are fully \u201cpassed through\u201d.<span class=\"ff3f\"> </span>See also Note<span class=\"_ _2\"></span> 9.1.14.<span class=\"_ _e\"></span><span class=\"fs11\"> </span>3.3.15 <span class=\"_ _1dd\"> </span>Other non-current liabilities  Govern<span class=\"_ _e\"></span>ment grants  Government gran<span class=\"_ _2\"></span>ts are recognised when it is reasonably <span class=\"_ _e\"></span>certain that the group will receive such grants and that all underlying conditions will b<span class=\"_ _2\"></span>e met. Grants related to an asset are pres<span class=\"_ _e\"></span>ented under other liabilities and will be recognised in the <span class=\"_ _e\"></span>statement of profit or loss on a systematic <span class=\"_ _2\"></span>basis over the expected useful life of the asset in question. Grants related to expense items ar<span class=\"_ _e\"></span>e recognised in<span class=\"_ _2\"></span> the statement of <span class=\"_ _2\"></span>profit or loss in the same period as the expe<span class=\"_ _e\"></span>nses for which the<span class=\"_ _2\"></span> grant was received. Government grants are presented as other operating in<span class=\"_ _2\"></span>come in the statement of profit or loss. Contract liabilities <span class=\"_ _e\"></span><span class=\"ff43\">\u2013</span> last mile connection The consider<span class=\"_ _2\"></span>ation of the last mile connection is paid upfro<span class=\"_ _e\"></span>nt, whilst the<span class=\"_ _2\"></span> rev<span class=\"_ _e\"></span>enues are recognised over the lifetime of <span class=\"_ _e\"></span>the underlying asset. The amounts to be relea<span class=\"_ _2\"></span>sed in future are reflected <span class=\"_ _e\"></span>in this section<span class=\"_ _2\"></span>. See also No<span class=\"_ _e\"></span>te 3.4.1.<span class=\"fs11\"> </span>3.3.16 <span class=\"_ _1dd\"> </span>Leases Upon the<span class=\"_ _2\"></span> inception of a contract, the gr<span class=\"_ _e\"></span>oup assesses whether a<span class=\"_ _2\"></span> contract is, or contains, a lease. A contract is, or contains, a lease if the contract<span class=\"_ _2\"></span> conveys the right to control the use of an identified asset for a period of time in exchange for consideration. To assess<span class=\"_ _e\"></span> whether a contract con<span class=\"_ _2\"></span>veys the right to control the use of an identi<span class=\"_ _e\"></span>fied asset, the group uses the definition of a lease included in IFRS 16. The group as a lessee The group<span class=\"_ _2\"></span> recognises a right<span class=\"_ _e\"></span>-<span class=\"ls5b\">of</span>-use asset and a lease liability <span class=\"ls5b\">on </span>the lease commencement date. Assets and liabilities arising from a lease are initially m<span class=\"_ _2\"></span>easured on a present value basis<span class=\"_ _e\"></span> <span class=\"ls5b\">and</span> discounted using the group's best estimate for the weighted average incremental borro<span class=\"_ _2\"></span>wing rate, in case the rate implicit in the <span class=\"_ _e\"></span>lease cannot be readily determined<span class=\"ls1d\">. </span>The group applies a <span class=\"_ _e\"></span>single discount rate per group of similar<span class=\"_ _2\"></span> contracts, su<span class=\"_ _e\"></span>mmarised per the<span class=\"_ _2\"></span>ir durat<span class=\"_ _e\"></span>ion.  Lease payments included in the measuremen<span class=\"_ _2\"></span>t of the lease<span class=\"_ _e\"></span> liability comprise fixed payments, including in-substance fixed payments. Variable lea<span class=\"_ _2\"></span>se payments are expensed as incurred. As <span class=\"ls5b\">a <span class=\"_ _e\"></span></span>practical expedient, no distinction is made between lease and non<span class=\"_ _e\"></span>-lease components.<span class=\"fs11\"> </span>Comp<span class=\"_ _2\"></span>onents that do not transfer any goods <span class=\"_ _e\"></span>or services (initial direct costs, prepayments) are excluded from the lease price. Right of use assets are subsequently reduced by a<span class=\"_ _2\"></span>ccumul<span class=\"_ _e\"></span>ated depre<span class=\"_ _2\"></span>ciation, impairment losses and any adjustment<span class=\"_ _e\"></span>s resulting<span class=\"_ _2\"></span> from the remea<span class=\"_ _2\"></span>surement of the lease liability. <span class=\"_ _e\"></span>These assets are depreciated using the straight-line method from the commencement date to the end of <span class=\"_ _2\"></span>the lease term, unless the lease transfers ownership <span class=\"_ _e\"></span>of the underlying asset to the group by the end of the lease term or the cost of the right-<span class=\"ls5b\">of</span>-use asset reflects the fact that the group will exercise a purchase option. In that case the right-<span class=\"ls5b\">of</span>-use asset will b<span class=\"ls5b\">e </span>depre<span class=\"_ _2\"></span>ciated over the useful life of the underlying asset, which is determined on the same basis as that of property <span class=\"_ _e\"></span>and equipment. The lea<span class=\"_ _2\"></span>se liability is subsequently increased by the interest cost on the lease liability and reduced by lease payment<span class=\"_ _e\"></span>s made. It is remea<span class=\"_ _2\"></span>sured when there is a change in future lease payments arising from a change in an index or rate, a change in the e<span class=\"_ _2\"></span>stimat<span class=\"_ _e\"></span>e of the amoun<span class=\"_ _2\"></span>t expected to be payable under a residual value guarantee, or a change in the reassessment of whether a purc<span class=\"_ _e\"></span>hase or extension option is reasonably certain t<span class=\"_ _2\"></span>o be exercised or a termination option not to be exercised.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> presents right-<span class=\"ls5b\">of<span class=\"_ _e\"></span></span>-<span class=\"ff42\">use assets within \u2018property, plant and equ<span class=\"_ _2\"></span>ipment\u2019 and lease liabilities within \u2018loans and borrowings\u2019 (current </span>and non-curren<span class=\"_ _2\"></span>t) in the statement of financial position.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> has elected not to recognise right-<span class=\"ls5b\">of<span class=\"_ _e\"></span></span>-use assets and lease liabilities for leases of low-value assets and s<span class=\"_ _e\"></span>hort-term leases, including IT eq<span class=\"_ _2\"></span>uipment. The group recognises the lease payments associated with these leases as an expense on a straight-line basis over the lease<span class=\"_ _2\"></span> term. The group as a lessorLeases that sub<span class=\"_ _2\"></span>stantially transfer all the risks and rewards incidental to ownership of an underlying asset are recognised as<span class=\"_ _e\"></span> finance leases. All other lea<span class=\"_ _2\"></span>ses that do not transfer all such <span class=\"_ _e\"></span>risks and rewards are recognised as operating leases. As a lessor, the <span class=\"_ _e\"></span>group has only opera<span class=\"_ _2\"></span>ting lease contracts. The lease payments received <span class=\"_ _e\"></span>are recognised as other income on a straight-line basis over the lease term.<span class=\"fs11\"> </span>3.3.17 <span class=\"_ _24f\"> </span>Regulatory deferral accounts The group<span class=\"_ _2\"></span> operates in a regulated environment in which tariffs are meant to realise total revenue/income consisting of:<span class=\"_ _20\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">a re<span class=\"_ _2\"></span>asonable return on invested capital; </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">all rea<span class=\"_ _2\"></span>sonable costs which are incurred by the group.<span class=\"_ _e\"></span> </span></span>Since the tariffs are ba<span class=\"_ _2\"></span>sed on estimates, there is always a difference between the tariffs that are actually charged and the t<span class=\"_ _e\"></span>ariffs that should ha<span class=\"_ _2\"></span>ve been charged (tariff setting agreed with regul<span class=\"_ _e\"></span>ator) to cover all reasonable costs of the system operator including <span class=\"ls5b\">a </span>reasonable profit marg<span class=\"_ _2\"></span>in for its shareholders.<span class=\"_ _e\"></span> If the applied tariffs <span class=\"_ _2\"></span>result in a surplus or a deficit at the end of the year, this means that the tariffs charged to <span class=\"_ _e\"></span>end consumers should have been lower or<span class=\"_ _2\"></span> higher respectively (<span class=\"_ _e\"></span>and vice versa). This surplus or deficit is therefore reported in the regulatory deferral account.  The release<span class=\"_ _2\"></span> of the regulatory deferral account will impact future tariffs: i<span class=\"_ _e\"></span>ncurred regulatory liabilities will de<span class=\"_ _2\"></span>crease fu<span class=\"_ _e\"></span>ture tariffs, whilst incurred regulato<span class=\"_ _2\"></span>ry assets will increase future tariffs.<span class=\"_ _e\"></span> In the absence of an IF<span class=\"_ _2\"></span>RS standard which specifically applyies<span class=\"_ _e\"></span> to the treatment <span class=\"ls5b\">of</span> these regulatory deferral accounts, Elia manageme<span class=\"_ _e\"></span>nt referred to the<span class=\"_ _2\"></span> requirements of IFRS 14 and the Conceptual Framework for Financial Reporting al<span class=\"_ _e\"></span>ongside the lates<span class=\"_ _e\"></span>t change<span class=\"_ _2\"></span>s in the IASB project on Ra<span class=\"_ _2\"></span>te-regulated Activities to develop the following accounting policy: <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">a liability is re<span class=\"_ _2\"></span>cognised in the statement of financial position and presented as part of <span class=\"_ _e\"></span><span class=\"ff42\">\u201caccruals and deferred income\u201d</span> with respect </span></span>to the Elia g<span class=\"ff42\">roup\u2019s obligation</span> to deduct an amount from the tariffs <span class=\"_ _2\"></span>to be charged to customers in future periods because the total allowed compensa<span class=\"_ _2\"></span>tion for goods or services already supplied is lower than the amount already charged to customers<span class=\"_ _e\"></span>, or excess revenues has been<span class=\"_ _2\"></span> generated due to higher v<span class=\"_ _e\"></span>olumes than initially estimated (regulatory liability);  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">an a<span class=\"_ _2\"></span>sset is recognised in the statement of financial position w<span class=\"_ _e\"></span>ith respect to the Elia g<span class=\"ff42\">roup\u2019s</span> right to add an amount to the tariffs to </span></span>be charged to customer<span class=\"_ _2\"></span>s in future periods because the total allowed compensation for the goods or services already supplied exceeds the amount already cha<span class=\"_ _2\"></span>rged to customers <span class=\"_ _e\"></span>or shortage in revenues has occurred due to lower volumes than initially estimated (regulatory asse<span class=\"_ _2\"></span>t); and<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the n<span class=\"_ _2\"></span>et movement in the regulatory deferral accounts for the period is presented separately in the statement of profit or loss within<span class=\"_ _e\"></span> </span></span>the line item <span class=\"ff42\">\u201cnet regulatory income (e<span class=\"_ _2\"></span>xpense)\u201d.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>The amoun<span class=\"_ _2\"></span>t in the regulatory deferral accounts is rep<span class=\"_ _e\"></span>orted on an annual basis and assessed by the regulator. The <span class=\"_ _1\"></span>s<span class=\"_ _e\"></span>um <span class=\"_ _4b\"></span>of <span class=\"_ _2\"></span>revenue <span class=\"_ _1\"></span>f<span class=\"_ _e\"></span>rom <span class=\"_ _4b\"></span>contracts <span class=\"_ _4b\"></span>with <span class=\"_ _4b\"></span>cus<span class=\"_ _e\"></span>tomers <span class=\"_ _4b\"></span>(<span class=\"_ _e\"></span>as <span class=\"_ _1\"></span>d<span class=\"_ _e\"></span>efi<span class=\"_ _e\"></span>ned <span class=\"_ _1\"></span>in<span class=\"_ _e\"></span> <span class=\"_ _4b\"></span>IFRS <span class=\"_ _2\"></span>15), <span class=\"_ _4b\"></span>other <span class=\"_ _4b\"></span>income <span class=\"_ _4b\"></span>an<span class=\"_ _e\"></span>d <span class=\"_ _4b\"></span>the <span class=\"_ _4b\"></span>n<span class=\"_ _e\"></span>et <span class=\"_ _4b\"></span>income <span class=\"_ _4b\"></span>(expens<span class=\"_ _e\"></span>e) <span class=\"_ _4b\"></span>from <span class=\"_ _2\"></span>the <span class=\"_ _4b\"></span>settlement mechan<span class=\"_ _2\"></span>ism <span class=\"_ _e\"></span>is <span class=\"_ _e\"></span>also p<span class=\"_ _e\"></span>resented as <span class=\"_ _e\"></span>a subt<span class=\"_ _e\"></span>otal he<span class=\"_ _e\"></span>aded <span class=\"_ _e\"></span><span class=\"ff42\">\u201c</span>Revenue, other i<span class=\"_ _e\"></span>ncome <span class=\"_ _e\"></span>and <span class=\"_ _e\"></span>net inco<span class=\"_ _e\"></span>me (expense) <span class=\"_ _e\"></span>from settl<span class=\"_ _e\"></span>ement m<span class=\"_ _e\"></span>echanism<span class=\"ff42\">\u201d</span><span class=\"ls1d\">, <span class=\"_ _e\"></span></span>as in <span class=\"_ _20\"></span>substance <span class=\"_ _e\"></span>it<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>represents <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>rev<span class=\"_ _e\"></span>enue <span class=\"_ _20\"></span>that <span class=\"_ _20\"></span>is <span class=\"_ _e\"></span>ec<span class=\"_ _e\"></span>onomically <span class=\"_ _20\"></span>earned <span class=\"_ _20\"></span>during <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>pe<span class=\"_ _e\"></span>riod <span class=\"_ _20\"></span>taking <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>nto <span class=\"_ _20\"></span>account <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>regulated<span class=\"_ _20\"></span> <span class=\"_ _20\"></span>environment <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>n which the Elia group operates<span class=\"ls1d\">. </span>The effect of discounting is reflected in the financia<span class=\"_ _2\"></span>l result. <span class=\"_ _e\"></span>See Note 9.  3.4 <span class=\"_ _24d\"></span>Items in the statement of profit or loss3.4.1 <span class=\"_ _36\"> </span>Inco<span class=\"_ _e\"></span>me Revenu<span class=\"_ _e\"></span>es IFRS 15 est<span class=\"_ _2\"></span>ablishes a five-step model to account for <span class=\"_ _e\"></span>revenue arising from contracts <span class=\"_ _2\"></span>with customers and requires that revenue be recogn<span class=\"_ _2\"></span>ised at an amount that reflects the consideration to which an entity expects to be entitled in exchange for transferring goods or services to a customer. The<span class=\"_ _2\"></span>se are the five steps to consider for each customer contract: 1.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Identifing the contract(s) with a customer; </span></span>2.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Identifing the performance obligations in the contract(s); </span></span>3.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Determining the transaction price; </span></span>4.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Allocating the transaction price to the performance obligations; </span></span>5.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Recognising revenue when performance obligations are satisfied, or when control of goods or services is transferred to the </span></span>customer. The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s main revenues <span class=\"ff3f\">are realised by TSOs which o<span class=\"_ _e\"></span>perate in accordan<span class=\"_ _2\"></span>ce with r<span class=\"_ _e\"></span>egulatory frameworks and which have de </span></span>facto/lega<span class=\"_ _2\"></span>l monopolies in their respective control zones. T<span class=\"_ _e\"></span>he framewor<span class=\"_ _2\"></span>ks w<span class=\"_ _e\"></span>hich apply in the g<span class=\"ff42\">roup\u2019s </span>main countries of activity are detailed in<span class=\"_ _2\"></span> Note 9 <span class=\"ff42\">\u2018</span>Regulatory framework and tariffs<span class=\"ff42\">\u2019<span class=\"ff45\">.<span class=\"_ _e\"></span></span></span> With regard to the regulated bu<span class=\"_ _2\"></span>siness, each service is based on a standard contract with the customer, mostly with<span class=\"_ _e\"></span> a predefined regulated tariff (<span class=\"_ _2\"></span>unit price multiplied by th<span class=\"_ _e\"></span>e volume (injection or<span class=\"_ _2\"></span> offtake) or the reserved capacity (depending on the type of service)<span class=\"_ _e\"></span>), so pricing is not var<span class=\"_ _2\"></span>iable. The allocation of the transaction pri<span class=\"_ _e\"></span>ce over the different performance obligations is therefore <span class=\"_ _e\"></span>straightforward (one-to<span class=\"ls0\">-one relationship). Most of these con<span class=\"_ _2\"></span>tracts <span class=\"_ _e\"></span>are concluded for an indefinite period and have general payment terms of <span class=\"ls5b\">15</span>-30 days.<span class=\"_ _e\"></span> </span>Considerin<span class=\"_ _2\"></span>g the business of the Elia <span class=\"_ _e\"></span>group, there are no relevant right-<span class=\"ls78\">of<span class=\"_ _2\"></span><span class=\"ls0\">-return and warranty obligations. </span></span>For a<span class=\"_ _2\"></span>ll services provided by the group, Elia is the sole an<span class=\"_ _e\"></span>d primary party responsible for executing the service and is thus the principal. <span class=\"_ _e\"></span> However, in<span class=\"_ _2\"></span> its role as a TSO, Elia <span class=\"_ _e\"></span>Transmission Belgium SA/NV and 50Hertz Transmission GmbH are subject to public service obligation<span class=\"_ _2\"></span>s imposed by the government/regulation mechanisms. These oblig<span class=\"_ _e\"></span>ations mainly relate to financial support for the development of renewable ener<span class=\"_ _2\"></span>gy. TSOs act as agents for these activities, and since the expense/income streams are fully covered by tariffs, t<span class=\"_ _e\"></span>hey have no<span class=\"_ _2\"></span> impact on the statement of profit and loss. See section <span class=\"ff42\">\u2018</span>Levies<span class=\"ff42\">\u2019</span> of Note 3.3.14 for more information on the accounting treatment. The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s main performance obligations/contract types, their pricing and the rev<span class=\"ff3f\">e<span class=\"_ _e\"></span>nue recognition method for 2022 can be summarised </span></span>as follows: Revenue <span class=\"_ _e\"></span>by category for Elia Tran<span class=\"_ _2\"></span>smission Belgium Revenue stream Nature, customer and timing of satisfaction of performance o<span class=\"_ _2\"></span>bligations<span class=\"_ _e\"></span> Contract <span class=\"ff43\">\u2013</span> Price setting Grid revenues Technical studies<span class=\"ff3f\"> conducted at the request of grid users, connected directly to the </span>Contract and tariff approved by grid with a view to having a new connection built or an existing connection alt<span class=\"_ _2\"></span>ered. <span class=\"_ _20\"></span> regulator. The revenue is recognised at the point in time when the study is delivered. Fixed amount per type of study. Last-<span class=\"_ _e\"></span>mile conn<span class=\"_ _2\"></span>ection <span class=\"ff3f\">is a component of the grid connection contract. At the requ<span class=\"_ _2\"></span>est </span>Standard contract approved by of a future grid user, Elia constructs/adjusts a dedicated/ physical <span class=\"_ _2\"></span>connection, known regulator, but the price is set on as a last-mile connection, to connect the customer<span class=\"ff42\">\u2019s fac<span class=\"_ _e\"></span>ility to Eli<span class=\"_ _2\"></span>a\u2019s grid. Although </span>the basis of the budget for control of the asset is not transferred as such to the grid user, the <span class=\"_ _2\"></span>grid user obtains imple<span class=\"_ _e\"></span>menting the c<span class=\"_ _2\"></span>onnection. direct access to the high-vol<span class=\"_ _e\"></span>tage grid. The a<span class=\"_ _2\"></span>ccess right transferred by Elia is valuable to the grid user, hence why the grid user compensates Elia in cash. <span class=\"ff40\"> </span>Since the grid user simultaneously enters into a grid connectio<span class=\"_ _2\"></span>n contract, the t<span class=\"_ _e\"></span>w<span class=\"_ _2\"></span>o Grid connection activities (access right and grid connection services) are not distin<span class=\"_ _2\"></span>ct and constitute a single performance obli<span class=\"_ _e\"></span>gation and int<span class=\"_ _2\"></span>erdependence between the contracts. As the total amount of revenue recognised for this single performa<span class=\"_ _2\"></span>nce obligation, which includes grid connection services, is recognised over the life of the assets, the contract has no specific end date.  This component of the grid connection/grid user contract is presented separately  <span class=\"_ _2\"></span> (not part of the grid connection/revenues from the revenue cap) because the tariff<span class=\"_ _e\"></span>-setting method is very specific from a regulatory perspective. The fees charged to grid users/distribution sys<span class=\"_ _e\"></span>tem operators (DSO<span class=\"_ _2\"></span>s) cover the Contract and tariff approved by maintenance and operating<span class=\"ff3f\"> costs relating to the</span> de<span class=\"_ _e\"></span>dicated con<span class=\"_ _2\"></span>nection facilities. regulator. The revenue is recognised over time, as this service is performed continuously Tariff is set per asset type (e.g. throughout the contractual term. bay, km of cable). This component of the access contract signed with access holders/DSOs covers the Contract and tariff approved by development and management of the grid with a view to meeting capacity needs and regulator. Management and satisfying demand for electricity transmission.  EUR per kW/KVA for development of grid The revenue is recognised over time, as providing sufficient capacity and a resilient yearly/monthly peak and power infrastructure grid is a service performed continuously throughout the contractual term. available at access point. This component of the access contract signed with access holders/DSOs covers the Contract and tariff approved by mana<span class=\"_ _e\"></span>g<span class=\"_ _2\"></span>ement and operation of the electricity system and the offtak<span class=\"_ _2\"></span>e of additional regulator. Management of the reactive energy relat<span class=\"ls9d\">in<span class=\"_ _e\"></span></span>g <span class=\"ff42\">to Elia<span class=\"_ _e\"></span>\u2019s grid (different from the <span class=\"_ _2\"></span>connection assets).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>EUR per kW/ kVArh at access electricity system<span class=\"ff3f\"> </span>The revenue is recognised over time, as these services are performed continuously point.  throughout the contractual term. This component is part of the access contract signed with access <span class=\"_ _2\"></span>holders/DSOs, and Contract and tariff approved by covers (i) services to facilitate the energy market; (ii) services to <span class=\"_ _2\"></span>develop and regulator. enhance the integration of an effective and efficient electricity market;<span class=\"_ _e\"></span> (iii) the EUR per kW at access point. mana<span class=\"_ _e\"></span>g<span class=\"_ _2\"></span>ement of interconnectors and coordination with neighbouring countries and the European authorities; and (iv) the publication of data, as requir<span class=\"_ _2\"></span>ed by transparency Market integration obligations. The revenue is recognised over time,<span class=\"_ _e\"></span> as these services are <span class=\"_ _2\"></span>performed continuously throughout the contractual term. As defined in the BRP contract, the BRP<span class=\"_ _2\"></span> (Balance <span class=\"_ _e\"></span>Responsible Party) has a Contract and tariff/mechanism commitment to ensure a perfect balance between offtake and injection on the grid. In approved by regulator. Compensation for the event of an imbalance caused by a BRP, Elia has to activate the ancillary Based on market prices, EUR per imbalances services, <span class=\"_ _e\"></span>which are then invoiced t<span class=\"_ _2\"></span>o the <span class=\"_ _e\"></span>BRP. kW imbalance at access point. The revenue is recognised at the point in time when an imbalance<span class=\"_ _2\"></span> occurs.<span class=\"_ _e\"></span> Grid use along borders is organised through half<span class=\"_ _e\"></span>-yearly, quarterly,<span class=\"_ _2\"></span> monthly, weekly, Framework agreement with parties weekend, daily and intra-day auctions. Elia and the regulators decide which auctions and auction office. are conducted alon<span class=\"_ _e\"></span>g each border. Aucti<span class=\"_ _2\"></span>ons are organised through an auction office, Price is set based on price International revenues which acts as an agent. The auction office collects the revenues <span class=\"_ _2\"></span>paid by the difference in cross-border <span class=\"_ _e\"></span>mar<span class=\"_ _2\"></span>ket European energy traders, which are ultimately<span class=\"_ _e\"></span> shared between ne<span class=\"_ _2\"></span>ighbouring TSOs prices.  based on the volumes imported/exported on the border. The revenue is recognised at the point in time when an <span class=\"_ _e\"></span>import/exp<span class=\"_ _2\"></span>ort activity occurs. Revenue <span class=\"_ _e\"></span>by categor<span class=\"_ _2\"></span>y for 50 Hertz Transmission  Revenue stream Nature and timing of satisfaction of performance obligations Contract <span class=\"ff43\">\u2013</span> Price setting Grid revenues The \u2018grid use fee\u2019 is charged to grid users/DSOs connected to the <span class=\"_ _2\"></span>grid for the Standard contract and grid tariffs volume of injection and/or offtake on the onshore grid. This contract is signed with defined by regulator. grid users.  The revenue is recognised over time, as this service is a performed continuousl<span class=\"ls83\">y </span>throughout the contractual term. Revenues from incentive Last-<span class=\"_ _e\"></span>mile conn<span class=\"_ _2\"></span>ection <span class=\"ff42\">is a component of the \u2018grid use fee\u2019 contract. At the request </span>Standard contract approved by regulation<span class=\"ff3f\"> </span>of a future grid user, 50Hertz constructs a dedicated/physical connection, known as regulator, but the price is set on a last-mile connection, to create an interface point to the grid. Although control of the basis of the budget for the asset is not transferred as such to the grid user, the grid user obtains dire<span class=\"_ _2\"></span>ct imple<span class=\"_ _e\"></span>menting the c<span class=\"_ _2\"></span>onnection. access to the high-vo<span class=\"_ _e\"></span>ltage grid. Th<span class=\"_ _2\"></span>e access right<span class=\"_ _e\"></span> transferred by 50Hertz is valuable to the grid user, hence why the grid user compensates Elia in cash. <span class=\"ff40\"> </span>Since the grid user simultaneously enters into a grid connectio<span class=\"_ _2\"></span>n contract, the t<span class=\"_ _e\"></span>w<span class=\"_ _2\"></span>o activities (access right and grid connection services) are not d<span class=\"_ _e\"></span>istin<span class=\"_ _2\"></span>ct and constitute a single performance obligation and interdependence between the contr<span class=\"_ _2\"></span>acts.<span class=\"_ _e\"></span> As the total amount of revenue recognised for this single performa<span class=\"_ _2\"></span>nce obligation, which includes grid connection services, is recognised over the life of the <span class=\"_ _e\"></span>assets, the contract has no specific end date.  This component of the grid connection/grid user contract is presented separately (not part of the grid connection/revenues from the revenue cap) because the tariff<span class=\"_ _e\"></span>-setting method is very specific from a regula<span class=\"_ _e\"></span>tory perspective. This component comprises tariffs charged to grid users/DSOs to c<span class=\"_ _2\"></span>over grid Contract and tariffs predefined in Revenues from offshore connection costs for offshore wind farms.  regulatory mechanism. regulation The revenue is recognised over time, as this service is performed continuously throughout the contractual term  This revenue stream consists of different components  Cong<span class=\"_ _2\"></span>esti<span class=\"_ _e\"></span>on management and redispatch <span class=\"ff3f\">fees are paid by market participants for </span>Standard contracts approved by use of the capacity made available by 50Hertz on specific lines (i<span class=\"_ _2\"></span>ncluding use of regulator and tariff mechanism cross-border assets). This allocation mechanism is governed by tr<span class=\"_ _2\"></span>ansparent, defined in regulatory schemes.  market-or<span class=\"_ _e\"></span>iented pr<span class=\"_ _2\"></span>ocedures.  The revenue is recognised at the point in ti<span class=\"_ _e\"></span>me when it is g<span class=\"_ _2\"></span>enerated<span class=\"ff40\"> </span>Compensation for imbalances<span class=\"_ _e\"></span><span class=\"ff3f\">  </span>Market participants (BRPs) have a commitment to ensure a perfect balance Standard contracts approved by Energy revenues between offtake and injection on the grid. In the event of an imbalance, 50Hertz regulator and tariff mechanism invoices the market participant to compensa<span class=\"_ _e\"></span>te for the cost<span class=\"_ _2\"></span>s incurred. defined in regulatory schemes.  The revenue is recognised at the point in time when an <span class=\"_ _e\"></span>imbalance<span class=\"_ _2\"></span> occurs. Horizontal reimbursement of lignite back-up costs In its role as a TSO, 50Hertz charges fees to other TSOs for servi<span class=\"_ _2\"></span>ces related to the  reserve power re<span class=\"_ _e\"></span>quired by t<span class=\"_ _2\"></span>he legal framework. The revenue is recognised over time, as this service is performed continuously throughout the contractual term. Other rev<span class=\"_ _e\"></span>enues Revenue stream Nature and timing of satisfaction of performance obligations Contract <span class=\"ff43\">\u2013</span> Price setting Other revenues Elia Grid International provides consultancy services to third parties around the Contract negotiated between E<span class=\"ls102\">GI</span> world.  and customer. The revenue is recognised over the comp<span class=\"_ _e\"></span>letion of the contract.  The contract price is set when the Third-party services contract is concluded with the Third-party services are presented in other revenues. customer. The payment term is generally 30 days from the invoice date. Re.alto provides a platform throu<span class=\"_ _e\"></span>gh which energy actors (e.g. tra<span class=\"_ _2\"></span>ders, prosumers) The commission fee is a fixed can exchange energy data. re.alto receives a commission on transactions percentage on each transaction. undertaken via the platform. Commission fee The revenue is recognised at the point in t<span class=\"_ _e\"></span>ime when t<span class=\"_ _2\"></span>he transaction occurs. The commission fee is presented in other revenues. This mainly covers other services than those described above.  Others<span class=\"ff3f\"> </span>The revenue is recognised at the point in time when the service is complete. Consequently, all revenue com<span class=\"_ _2\"></span>ponents contain revenue from contracts with customers, i.e. parties that have contract<span class=\"_ _20\"></span>s in p<span class=\"_ _2\"></span>lace with the Group <span class=\"_ _2\"></span>to obtain services resulting from the Group<span class=\"ff42\">\u2019s o<span class=\"_ _e\"></span>rdinary activities in exchange for </span><span class=\"ls5b\">a </span>consideration. Other in<span class=\"_ _e\"></span>come  Other in<span class=\"_ _2\"></span>come is recognised when the related service is p<span class=\"_ _e\"></span>erformed and no further performance obligations arise<span class=\"fc1d\">. </span>Net r<span class=\"_ _e\"></span>egulatory<span class=\"_ _2\"></span> income (expense) from <span class=\"_ _e\"></span>settleme<span class=\"_ _2\"></span>nt mech<span class=\"_ _e\"></span>anism Since the tariffs are based on estimates, there is a<span class=\"_ _2\"></span>lways a<span class=\"_ _e\"></span> difference be<span class=\"_ _2\"></span>tween the tariffs that are actually charged and the tariffs that should ha<span class=\"_ _2\"></span>ve been charged (tariff setting is ag<span class=\"_ _e\"></span>reed with the <span class=\"ff42\">regulator) to cover all the system operator\u2019s reasonab<span class=\"_ _2\"></span>le <span class=\"_ _e\"></span>costs, <span class=\"ff3f\">including a </span></span>reasonable profit marg<span class=\"_ _2\"></span>in for the shareholders.<span class=\"_ _e\"></span> If the applied tariffs <span class=\"_ _2\"></span>result in a surplus or deficit at the end of the year, this means that the tariffs charged to consumer<span class=\"_ _e\"></span>s/the general public could<span class=\"_ _2\"></span> have been lower or higher. This surplus or de<span class=\"_ _e\"></span>ficit is therefore reported in the settlement mechanism deferra<span class=\"_ _2\"></span>l account. <span class=\"_ _20\"></span> The release<span class=\"_ _2\"></span> of this deferral account will impact future tariffs: where regulatory liabilities are incurred, future tariffs wi<span class=\"_ _e\"></span>ll be lower, and where regula<span class=\"_ _2\"></span>tory assets are incurred, future ta<span class=\"_ _e\"></span>riffs will be higher. The<span class=\"_ _2\"></span> net movement in the regulatory deferral accounts for the period is presen<span class=\"_ _2\"></span>ted separately in the statement of profit or loss <span class=\"ls1c\">in</span> the line 'Net income (expense) from settlement mechanism'. See also Note 3.3.17. <span class=\"fs11\"> </span>3.4.2 <span class=\"_ _36\"> </span>Expenses Other <span class=\"_ _e\"></span>expenses Property taxes are d<span class=\"_ _2\"></span>irectly recognised in full as soon as o<span class=\"_ _e\"></span>wnership is certain (generally on 1 January of the year in question). However, these cost<span class=\"_ _2\"></span>s, which are considered to be <span class=\"ls5b\">non<span class=\"_ _e\"></span></span>-controllable costs under the regulatory framework, are recorded as revenue through the settlement me<span class=\"_ _2\"></span>chanism for the same amount, resulting in zero imp<span class=\"_ _e\"></span>act in terms of profit or loss. Finance income and expensesFinance<span class=\"_ _2\"></span> expenses comprise interest payable on <span class=\"_ _e\"></span>borrowings (calculated using the effective interest rate method)<span class=\"ls1d\">, </span>in<span class=\"_ _e\"></span>terest on lease liabilities, fore<span class=\"_ _2\"></span>ign-exchange losses, gains on currency hed<span class=\"_ _e\"></span>ging instruments that offset currency losses, results on interest-rate hedging instruments, losse<span class=\"_ _2\"></span>s on hedging instruments that are not part of a hedge accounting relationship, losses on financial assets classified as being for trading purposes and imp<span class=\"_ _2\"></span>airment losses on financial assets as well as any losses from hedge ineffectiveness. <span class=\"_ _e\"></span> Finance<span class=\"_ _2\"></span> income includes interest receivables on bank deposits, which a<span class=\"_ _e\"></span>re recognised in profit or loss using the effective interest rate method as the<span class=\"_ _2\"></span>y accrue.<span class=\"_ _e\"></span> Borrowing c<span class=\"_ _2\"></span>osts that are not directly attributable to the acquisition, construction or production of a qualifying asset <span class=\"_ _e\"></span>are re<span class=\"_ _2\"></span>cognised in profit or loss using the<span class=\"_ _2\"></span> effective interest method.<span class=\"_ _e\"></span> Inco<span class=\"_ _e\"></span>me taxes<span class=\"_ _2\"></span> Income taxes comprise<span class=\"_ _2\"></span> current and deferred tax. Income <span class=\"_ _e\"></span>tax expense is recognised in profit or loss, except where it relates to items recogn<span class=\"_ _2\"></span>ised directly in equity. Taxes on hybrid coupons are recognised in the statement of profit and loss as these <span class=\"_ _e\"></span>are a tax on profits whereas <span class=\"_ _2\"></span>the hybrid coupon itself is recognised directly i<span class=\"_ _e\"></span>n equity. Curren<span class=\"_ _2\"></span>t tax is the expected tax payable on taxable income for the year, using tax rates enacted or substantively enacted at the end of the reporting period, and a<span class=\"_ _2\"></span>ny adjustments to tax payable in relation to previous years. Deferred tax <span class=\"_ _2\"></span>is recognised, using the balance she<span class=\"_ _e\"></span>et method, on temporary differences arising between the carrying<span class=\"_ _e\"></span> amounts of assets and liabilities for fin<span class=\"_ _2\"></span>ancial reporting purposes and the amounts used for taxation purposes. Deferred tax is not recognised for<span class=\"_ _e\"></span> the following tempor<span class=\"_ _2\"></span>ary differences: the initial recognition of assets or liabilities in a transaction that is not a business c<span class=\"_ _e\"></span>ombination and that affects ne<span class=\"_ _2\"></span>ither accounting nor taxable profit<span class=\"ls1d\">; </span>a<span class=\"_ _e\"></span>nd differences relating to investments in sub<span class=\"_ _2\"></span>sidiaries and joint ventur<span class=\"_ _e\"></span>es where these will probably <span class=\"ls5b\">not</span> <span class=\"ls5b\">be</span> reversed in the foreseeable future. In addition, deferred tax is not recognised for taxable temporary differences arising from initia<span class=\"_ _2\"></span>l recognition of goodwill. Deferred tax is measured at the tax rates that are expected to be applied to the tempor<span class=\"_ _e\"></span>ary differences when the<span class=\"_ _2\"></span>y are reversed, based on the laws that have been enacted or substantively enacted by the reporting date. Deferred tax assets and liabilities are o<span class=\"_ _2\"></span>ffset if there is a legally enforceable right to offset current tax liabilities and assets and the <span class=\"_ _e\"></span>deferred items relate to income ta<span class=\"_ _2\"></span>xes levied by the same tax authority on the same taxable entity or on different tax entities, but they a<span class=\"_ _e\"></span>re intend<span class=\"ls5b\">ed</span> to settle curren<span class=\"_ _2\"></span>t tax liabilities and assets on a net basis, or th<span class=\"_ _e\"></span>eir tax assets and liabilities will be<span class=\"_ _2\"></span> realised si<span class=\"_ _e\"></span>multaneously. A deferred ta<span class=\"_ _2\"></span>x asset is recognised only to the extent that it is likely that future taxable profits will be ava<span class=\"_ _2\"></span>ilable agains<span class=\"_ _e\"></span>t<span class=\"_ _e\"></span> which the asset can be utilised. Deferred tax <span class=\"_ _2\"></span>assets are reduced to the extent that it is no longer likely that<span class=\"_ _e\"></span> the related tax benefit will be realised. Additional income ta<span class=\"_ _2\"></span>xes that arise from the distribution of dividends are recognised at the same time as the liability to pay<span class=\"_ _e\"></span> the related dividend. 3.5 <span class=\"_ _235\"> </span>Statement<span class=\"_ _e\"></span> of comprehensive inc<span class=\"_ _2\"></span>ome and statement of changes in equity<span class=\"_ _e\"></span> The statement of <span class=\"_ _2\"></span>comprehensive income presents an overview of all revenues and expenses recognise<span class=\"_ _e\"></span>d in the consolidated statement of pro<span class=\"_ _2\"></span>fit or loss and in the consolidated statement of changes in equity. The gr<span class=\"_ _e\"></span>oup has elected to present comprehensive income using the two-<span class=\"_ _2\"></span>statement approach, i.e. the statement of profit or loss immediately followed by th<span class=\"_ _e\"></span>e statement of other comprehensive income. As a result o<span class=\"_ _2\"></span>f this approach, the content of the statement <span class=\"_ _e\"></span>of changes in equity is r<span class=\"_ _2\"></span>estricted to owner-<span class=\"_ _e\"></span>related changes. 4.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Segment reporting</span>4.1 <span class=\"_ _148\"> </span>Basis for segment reporting The group<span class=\"_ _2\"></span> has opted for segment reporting, in conformity <span class=\"_ _e\"></span>with the different regulatory frameworks that currently exi<span class=\"_ _e\"></span>st within the group. This reporting approach closely reflects the g<span class=\"ff42\">roup\u2019s operational activitie<span class=\"_ _2\"></span>s and<span class=\"ff3f\"> is also in line with the g<span class=\"_ _e\"></span></span>roup\u2019s internal reporting to the </span>Chief Operating De<span class=\"_ _2\"></span>cision Maker (CODM), e<span class=\"_ _e\"></span>nabling the CODM to better evaluate and assess the g<span class=\"ff42\">roup\u2019s performance and a</span>ctivities in a transparent <span class=\"_ _2\"></span>way.<span class=\"_ _e\"></span> Pursuant to IF<span class=\"_ _2\"></span>RS 8, the group has identified the following <span class=\"_ _e\"></span>opera<span class=\"_ _2\"></span>ting segments based on the aforementioned criteria:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Elia Tra<span class=\"_ _2\"></span>nsmission (Belgium), which comprises the activities based undertaken in line with <span class=\"_ _e\"></span>the Belgian regulatory framework:<span class=\"_ _2\"></span> the </span></span>regulated act<span class=\"_ _2\"></span>ivities of Elia Transmission Belgium SA/NV<span class=\"_ _e\"></span>, El<span class=\"_ _e\"></span>ia Asset SA/NV, Elia Engineering SA/NV, Elia Re SA, HGRT SAS and Coreso SA/NV, whose act<span class=\"_ _2\"></span>ivities are directly linked to the role of the Belgian transmission system operator and are<span class=\"_ _e\"></span> subject to the regulatory frame<span class=\"_ _2\"></span>work applicable in Belgium <span class=\"ff42\">\u2013</span> s<span class=\"_ _e\"></span>ee Section 9.1.3. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">50Her<span class=\"_ _2\"></span>tz Transmission (Germany), which comprises the activities undertaken in line with the German regulatory framework: </span></span>Eurogrid GmbH, 50Hertz<span class=\"_ _2\"></span> Transmission GmbH and 50Hertz Offshore GmbH, whos<span class=\"_ _e\"></span>e activities are directly linked to the role of the transmission system<span class=\"_ _2\"></span> operator in Germany <span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span> see Section 9.2.3. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Non-r<span class=\"_ _2\"></span>egulated activities and Nemo Link, comprising<span class=\"ls1d\">: <span class=\"_ _e\"></span></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Elia Group NV/SA, mainly consisting of the holding activities in the Elia Transmission (Belgium) <span class=\"ls5b\">and </span>5<span class=\"_ _e\"></span>0Hertz Transmission </span></span>(Germany) segment<span class=\"ls1d\">; </span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Eurogrid International NV/SA; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">the h<span class=\"_ _e\"></span>olding <span class=\"_ _e\"></span>activities in<span class=\"_ _e\"></span> Nem<span class=\"_ _e\"></span>o Link <span class=\"_ _e\"></span>Lt<span class=\"_ _e\"></span>d. <span class=\"_ _e\"></span>This co<span class=\"_ _e\"></span>mpany co<span class=\"_ _e\"></span>mprises and<span class=\"_ _e\"></span> manages <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>Nemo <span class=\"_ _e\"></span>project, w<span class=\"_ _e\"></span>hich <span class=\"_ _e\"></span>connects <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>UK<span class=\"_ _e\"></span> </span></span>and <span class=\"_ _4b\"></span>Belgium <span class=\"_ _2\"></span>using <span class=\"_ _2\"></span>high-voltage e<span class=\"_ _2\"></span>lectricity <span class=\"_ _4b\"></span>c<span class=\"_ _e\"></span>ables, <span class=\"_ _2\"></span>enab<span class=\"_ _2\"></span>lin<span class=\"_ _e\"></span>g <span class=\"_ _2\"></span>power <span class=\"_ _4b\"></span>to<span class=\"_ _e\"></span> <span class=\"_ _2\"></span>be <span class=\"_ _4b\"></span>excha<span class=\"_ _e\"></span>nged <span class=\"_ _2\"></span>between <span class=\"_ _4b\"></span>the <span class=\"_ _2\"></span>two <span class=\"_ _2\"></span>countries <span class=\"_ _2\"></span>and <span class=\"_ _4b\"></span>f<span class=\"_ _e\"></span>or <span class=\"_ _4b\"></span>which<span class=\"_ _e\"></span> a specific regulatory framework ha<span class=\"_ _2\"></span>s been set up <span class=\"ff42\">\u2013</span> see Se<span class=\"_ _e\"></span>ction 9.3 for more<span class=\"_ _2\"></span> details;<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">the non-regulated activities <span class=\"ls5b\">of</span> t<span class=\"_ _e\"></span>he Elia Transmission (Belgi<span class=\"_ _e\"></span>um) segmen<span class=\"_ _2\"></span>t<span class=\"_ _e\"></span><span class=\"ls1d\">. </span><span class=\"ff42\">\u2019</span>N<span class=\"ls5b\">on</span>-<span class=\"_ _e\"></span>regulated activities<span class=\"ff42 ls1c\">\u2019 </span>refers to activities which<span class=\"_ _e\"></span> </span></span>are not dire<span class=\"_ _2\"></span>ctly related to the role of <span class=\"ls5b\">a <span class=\"_ _e\"></span></span>TSO <span class=\"ff42\">\u2013</span> see Section 9.1;<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">EGI <span class=\"_ _2\"></span>(Elia <span class=\"_ _4b\"></span>Grid <span class=\"_ _2\"></span>Inter<span class=\"_ _2\"></span>national <span class=\"_ _4b\"></span>NV/S<span class=\"_ _e\"></span>A, <span class=\"_ _4b\"></span>E<span class=\"_ _e\"></span>lia <span class=\"_ _4b\"></span>Grid <span class=\"_ _2\"></span>Intern<span class=\"_ _2\"></span>ational <span class=\"_ _4b\"></span>GmbH<span class=\"_ _e\"></span><span class=\"ls1d\">, <span class=\"_ _2\"></span><span class=\"ls0\">Elia <span class=\"_ _4b\"></span>Grid <span class=\"_ _2\"></span>Inte<span class=\"_ _2\"></span>rnational <span class=\"_ _4b\"></span>P<span class=\"_ _e\"></span>te. <span class=\"_ _4b\"></span>Ltd Singa<span class=\"_ _2\"></span>pore <span class=\"_ _4b\"></span>(closed <span class=\"_ _2\"></span>in <span class=\"_ _2\"></span>2022<span class=\"_ _2\"></span>),<span class=\"_ _e\"></span> </span></span></span></span>Elia <span class=\"_ _e\"></span>Grid <span class=\"_ _e\"></span>International <span class=\"_ _20\"></span>LLC <span class=\"_ _e\"></span>Saudi <span class=\"_ _20\"></span>Arabia <span class=\"_ _e\"></span>and<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>Elia <span class=\"_ _20\"></span>Grid<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>International Inc<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>Cana<span class=\"_ _e\"></span>da <span class=\"_ _e\"></span>(<span class=\"_ _e\"></span><span class=\"ls5b\">a <span class=\"_ _20\"></span></span>new <span class=\"_ _e\"></span>subsidiary <span class=\"_ _e\"></span>inc<span class=\"_ _e\"></span>orporated <span class=\"_ _e\"></span>in<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>2022<span class=\"_ _e\"></span>)<span class=\"ls95\">, </span>which <span class=\"_ _24d\"> </span>are <span class=\"_ _57\"> </span>companies <span class=\"_ _57\"> </span>that <span class=\"_ _57\"> </span>s<span class=\"_ _e\"></span>upply <span class=\"_ _24d\"> </span>speci<span class=\"_ _e\"></span>alists <span class=\"_ _57\"> </span>in <span class=\"_ _24d\"> </span>consulti<span class=\"_ _e\"></span>ng, <span class=\"_ _24d\"> </span>services, <span class=\"_ _57\"> </span>engin<span class=\"_ _e\"></span>eering <span class=\"_ _24d\"> </span>and <span class=\"_ _7c\"> </span>pr<span class=\"_ _2\"></span>ocurement, <span class=\"_ _24d\"> </span>cr<span class=\"_ _e\"></span>eating <span class=\"_ _24d\"> </span>v<span class=\"_ _e\"></span>alue <span class=\"_ _24d\"> </span>b<span class=\"_ _e\"></span>y<span class=\"_ _e\"></span> delivering<span class=\"_ _2\"></span> solutions based on international best practice w<span class=\"_ _e\"></span>hile fully complying with regulated business environments; o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Re.Alto-Energy <span class=\"_ _e\"></span>BV/SRL <span class=\"_ _20\"></span>and Re.Alto-Energy <span class=\"_ _e\"></span>GmbH, <span class=\"_ _e\"></span>a <span class=\"_ _20\"></span>start-up f<span class=\"_ _e\"></span>ounded <span class=\"_ _e\"></span>in <span class=\"_ _e\"></span>August <span class=\"_ _e\"></span>2019 <span class=\"_ _20\"></span>which <span class=\"_ _e\"></span>is <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>first <span class=\"_ _e\"></span>E<span class=\"_ _e\"></span>uropean <span class=\"_ _e\"></span>digital </span></span>marketp<span class=\"_ _2\"></span>lace for energy data and services;<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Windgrid, <span class=\"_ _e\"></span>a <span class=\"_ _20\"></span>new <span class=\"_ _20\"></span>entity <span class=\"_ _e\"></span>created <span class=\"_ _20\"></span>during <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>he <span class=\"_ _e\"></span>reporting <span class=\"_ _20\"></span>period <span class=\"_ _e\"></span>20<span class=\"_ _e\"></span>22, <span class=\"_ _e\"></span>w<span class=\"_ _e\"></span>hich <span class=\"_ _e\"></span>was<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>est<span class=\"_ _e\"></span>ablished <span class=\"_ _20\"></span>to <span class=\"_ _e\"></span>manage <span class=\"_ _20\"></span>expected <span class=\"_ _e\"></span>increase <span class=\"_ _e\"></span>in<span class=\"_ _20\"></span> </span></span>investmen<span class=\"_ _2\"></span>ts in renewable energy production and the offshore grid exp<span class=\"_ _e\"></span>ansion. The CODM has been identified<span class=\"_ _2\"></span> by the group as t<span class=\"_ _e\"></span>he Boards of Directors, CEOs and Management Committees of ea<span class=\"_ _e\"></span>ch segment. The CODM periodically re<span class=\"_ _2\"></span>views the performance of the gr<span class=\"_ _e\"></span>oup's segments using various indicators such as revenue, EBITDA and operating profit. The information presented to the CODM follows the group's IFRS accounting policies, so no reconciling items have to be disclosed.6.18. <span class=\"_ _92\"> </span>Fin<span class=\"_ _e\"></span>ancial instruments <span class=\"ff43\">\u2013</span> fair values The fo<span class=\"_ _2\"></span>llowing table shows the carrying amounts and fair values of financial assets and liabilities, including their levels in<span class=\"_ _e\"></span> the fair value hierar<span class=\"_ _2\"></span>chy<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> Carrying amount Fair value (in \u20ac million)<span class=\"ff40\"> </span>Balance at 31 December<span class=\"_ _2\"></span> 2021<span class=\"ls0\"> </span>Other financial assets 7.0  399.4  46.2  452.5  362.6  43.8  406.4  Equity instruments at fair value through other comprehensive income 43.8  43.8  43.8  43.8  Equity instruments at fair value through income 7.0  7.0  7.0  7.0  Derivatives 355.6  355.6  355.6  355.6  Regulatory assets 46.2  46.2  Trade and other receivables  (Current and Non-current) 861.8  861.8  Cash and cash equivalents 3,049.5  3,049.5  Loans and borrowings (Current and Non-Current) 0.0  0.0  0.0  (7,935.7) (7,935.7) (7,968.8) (247.8) (8,216.6) Unsecured bond issues (7,248.5) (7,248.5) (7,476.8) (247.8) (7,724.6) Unsecured financial bank loans and other loans (492.0) (492.0) (492.0) (492.0) Lease liabilities (118.8) (118.8) Accrued interests (76.4) (76.4) Trade and other payables (3,696.4) (3,696.4) Total 7.0 399.4 3,957.5 (11,632.0) (7,268.2) n.r. n.r. n.r. n.r. Balance at 31 December<span class=\"_ _2\"></span> 2022<span class=\"ls0\"> </span>Other financial assets 7.0  296.1  33.8  336.9  226.6  76.4  303.1  Equity instru<span class=\"_ _e\"></span>ments at fa<span class=\"_ _2\"></span>ir value through other comprehensive income 76.4  76.4  76.4  76.4  Equity instruments at fair value through income 7.0  7.0  7.0  7.0  Derivatives 219.7  219.7  219.7  219.7  Regulatory assets 33.8  33.8  Trade and other receivables (Current and Non-current) 1,367.1  1,367.1  Cash and cash equivalents 4,151.2  4,151.2  Loans and borrowings (Current and Non-Current) 0.0  0.0  0.0  (8,582.8) (8,582.8) (8,183.4) (172.9) (8,356.3) Unsecured bond issues (7,243.0) (7,243.0) (7,015.7) (172.9) (7,188.6) Unsecured financial bank loans and other loans (1,167.7) (1,167.7) (1,167.7) (1,167.7) Lease liabilities (90.2) (90.2) Accrued interests (81.9) (81.9) Other non-current liabilities  (24.7) (24.7) out of which, <span class=\"ff48\">Derivatives</span> (24.7) (24.7) (24.7) (24.7) Trade and other payables (4,804.2) (4,804.2) Total 7.0 2<span class=\"ls104\">71<span class=\"_ _e\"></span></span>.4 5,552.1 (13,387.0) (7,556.5) n.r. n.r. n.r. n.r. The above t<span class=\"_ _2\"></span>ables do not include fair value information for financial assets and liabilities not measured at fair value, such as cash and cash equ<span class=\"_ _2\"></span>ivalents, trade and other receivables, and trade and other payables, as their carrying amount is a reasona<span class=\"_ _e\"></span>ble approximation of fair value<span class=\"_ _2\"></span>. We consider that the carrying amount approxi<span class=\"_ _e\"></span>mates the fair value considering the financial and short-te<span class=\"_ _e\"></span>rm nature. FAIR VALUE HI<span class=\"_ _e\"></span>ERARCHY<span class=\"ff3f\"> </span>Fair va<span class=\"_ _2\"></span>lue is the amount for which an asset could be exchanged or a liability settled in an arm's-le<span class=\"_ _e\"></span>ngth transaction. IFRS 7 requires,<span class=\"_ _2\"></span> for financial instrume<span class=\"_ _2\"></span>nts that are measured in the s<span class=\"_ _e\"></span>tatement of financial position at fair value and for financial instruments measured at amortised cost for which<span class=\"_ _2\"></span> the fair value has been disclosed<span class=\"_ _e\"></span>, the disclosure of fair value measurements by level in the following fair value measurement hierarch<span class=\"_ _2\"></span>y: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 1: <span class=\"ff3f\">The fair value of a financial instrument that is traded in an active <span class=\"_ _e\"></span>market is measured based on quoted (unadjusted) </span></span></span>prices for iden<span class=\"_ _2\"></span>tical assets or liabilities. A market is considered active if quoted prices are readily and regularly availabl<span class=\"_ _e\"></span>e from an exchange, dea<span class=\"_ _2\"></span>ler, broker, industry group, pricing service or regulatory agency, and those prices represent actual a<span class=\"_ _e\"></span>nd regularly occurring market transa<span class=\"_ _2\"></span>ctions on an arm\u2019s<span class=\"ff3f\">-length basis.<span class=\"_ _e\"></span> </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 2: <span class=\"ff3f\">The fair value of financial instruments that are not traded in an active market is determined usin<span class=\"_ _e\"></span>g valuation techniques. </span></span></span>These maximise the use of observable market data where these are available and rely as little as possible on entity-specific estimates.<span class=\"_ _2\"></span> If all significant inputs required to assess the fair value of an instrument are observable, either directly (i.e.<span class=\"_ _e\"></span> as prices) or indirectly (<span class=\"_ _2\"></span>i.e. derived from prices), the instrument is included in level 2.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 3: <span class=\"ff3f\">If one or more of the significant inputs used in applying the valuation technique is not based on observable market data, </span></span></span>the finan<span class=\"_ _2\"></span>cial instrument is included in level 3. T<span class=\"ff42\">h<span class=\"_ _e\"></span>e fair value amount included under \u2018Other financial assets\u2019 ha<span class=\"_ _2\"></span>s been determined </span>by referring<span class=\"_ _2\"></span> to either: (i) recent transaction prices, known <span class=\"_ _e\"></span>by the group; for similar financial assets or (ii) valuation reports issued by third partie<span class=\"_ _2\"></span>s. The fa<span class=\"_ _2\"></span>ir value of financial assets and liabilities, other than those presented in the above table, approximates to their carrying amounts largely due to the sh<span class=\"_ _2\"></span>ort-term maturities of these instrume<span class=\"_ _e\"></span>nts. The fa<span class=\"_ _2\"></span>ir value of other financial assets decreased by \u20ac115.6 million compar<span class=\"_ _e\"></span><span class=\"ff3f\">ed to previous year. The decrease mainly results from the </span>fair value<span class=\"_ _2\"></span> of the future contracts entered into by 50Hertz for the purpose of reducing the risk of fluctuations in the expected amount of grid losses <span class=\"ff42\">(\u20ac154,4 m<span class=\"_ _2\"></span>illion end of 2022 compared to \u20ac355.6 m<span class=\"ff3f\">illion last year). This decrease is partly offset by the positive value </span></span>accounted for<span class=\"_ _2\"></span> in Belgium in connection with the pre-<span class=\"_ _e\"></span>hedging of probable forecast debt transa<span class=\"_ _2\"></span>ctions (bonds issuance). The fair value of these derivatives amounted<span class=\"_ _2\"></span> to \u20ac65.3 million. <span class=\"ff3f\">The </span>fair v<span class=\"_ _e\"></span>alue of the Sicav and the group\u2019s stake in EEX increased following rea<span class=\"_ _2\"></span>ssessment of the fair valu<span class=\"_ _2\"></span>e of EEX. Despite a lo<span class=\"_ _2\"></span>wer pricing on the market, the fair value of the bank loans and bond issues increased by \u20ac139.7 million, due to t<span class=\"_ _e\"></span><span class=\"ff3f\">he higher </span>nominal va<span class=\"_ _2\"></span>lue (additional Green Bond in Germany).<span class=\"_ _e\"></span> The fa<span class=\"_ _2\"></span>ir value of sicavs falls into level 1, i.e. valuation is b<span class=\"_ _e\"></span>ased on<span class=\"_ _2\"></span> the listed market price on an active market for identical instruments.<span class=\"_ _20\"></span> The derivative<span class=\"_ _2\"></span> from the price hedge for grid loss procu<span class=\"_ _e\"></span>rement, which is measured at fair value in OCI without affe<span class=\"_ _2\"></span>cting profit or loss, falls under<span class=\"_ _2\"></span> level 1 of the measurement hierarchy. Its value is determined on the basis of the reporting date valuation of the exist<span class=\"_ _e\"></span>ing futures contract<span class=\"_ _2\"></span>s, which are fully contracted via the EEX electricit<span class=\"_ _e\"></span>y exchange and quo<span class=\"_ _2\"></span>ted there. Credit and default risks are avoided with this form o<span class=\"_ _2\"></span>f price hedging via exchange transactions. A<span class=\"_ _e\"></span>t December 31, 2022, the Group reported derivative financia<span class=\"_ _2\"></span>l ins<span class=\"_ _e\"></span>truments in a net amoun<span class=\"_ _2\"></span>t of \u20ac129.6 million. The futures contracts were concluded during the fiscal year at prices between \u20ac61 and \u20ac295 per MWh. As a result of the vo<span class=\"_ _2\"></span>latile price development on the electricity market, a differentiated picture emerged on the balance sheet dat<span class=\"_ _e\"></span>e: Futures for 2023 were still con<span class=\"_ _2\"></span>tracted at advantageous hedging prices and show a positive market value (\u20ac 154.3 million) on the balance s<span class=\"_ _e\"></span><span class=\"ff3f\">heet </span>date, while<span class=\"_ _2\"></span> the futures positions already contracted for 2024 show a negative market value (\u20ac <span class=\"_ _e\"></span><span class=\"ff3f\">-24.7 million) as a result of the price </span>decline shortly be<span class=\"_ _2\"></span>fore the end of 2022. At the balance sheet date, the Group had already hedged a volume of 2.9 TWh for its ex<span class=\"_ _e\"></span>pected physical requirements for grid loss <span class=\"_ _2\"></span>energy in subsequent <span class=\"_ _e\"></span>years. The fa<span class=\"_ _2\"></span>ir value of the bonds is \u20ac7.<span class=\"ff3f ls5b\">036<span class=\"_ _e\"></span><span class=\"ls0\">.5 million (pr</span></span>ior year: <span class=\"_ _e\"></span>\u20ac7.<span class=\"ff3f ls5b\">724<span class=\"ls0\">,6 million). Fair value was determined by reference to published price </span></span>quotations in an active marke<span class=\"_ _2\"></span>t (classified as level 1 in the <span class=\"_ _e\"></span>fair value<span class=\"_ _2\"></span> hierarchy). The fair value of the registered bond is <span class=\"_ _e\"></span><span class=\"ff42\">\u20ac37.2 million</span> <span class=\"ls5b\">as</span> of 31 December 2022 and was determined by reference to third party information, <span class=\"_ _2\"></span>such as pricing services (classified as level 3 in the fair value<span class=\"_ _2\"></span> hierarchy). The fair value of the private placement amounts to <span class=\"ff42\">\u20ac</span>1<span class=\"ls5b\">33<span class=\"_ _e\"></span></span>.2 million (classified as level 3 in the fair value hierarchy).<span class=\"_ _e\"></span> The fa<span class=\"_ _2\"></span>ir value of other bank loans approximates to their carrying amounts largely due to the short-t<span class=\"_ _e\"></span>erm maturities of these instruments. Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSummaryOfSignificantAccountingPoliciesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__25-1": {
   "value": "3.1. <span class=\"_ _87\"> </span>Basis of consolidation SUBSIDIARIES A subsidiary is a<span class=\"_ _2\"></span>n entity that is controlled by the Compan<span class=\"_ _e\"></span>y. The group controls an entity when it is exposed, or has rights, to variable return<span class=\"_ _2\"></span>s from its involvement with the entity and has the abil<span class=\"_ _e\"></span>ity to affe<span class=\"_ _2\"></span>ct those returns th<span class=\"_ _e\"></span>rough its power over the entity. The financial statements of <span class=\"_ _2\"></span>subsidiaries are included in the consolidated financial st<span class=\"_ _e\"></span>atements from the date this control commences until the date that it ceases. The a<span class=\"_ _2\"></span>ccounting policies of subsidiaries are changed when necessary, in order to align them with the policies adopted by the group<span class=\"_ _2\"></span>. Losses applicable to the non-controlling interests in a subsidiary are allocated to the non-controlling interest<span class=\"_ _e\"></span>s even if th<span class=\"_ _2\"></span>is results in a deficit <span class=\"_ _2\"></span>balance of the non-controlling interests.<span class=\"_ _e\"></span> Changes <span class=\"ls1d\">to</span> the group's interest in a non-wholly-owned subsidiary that do not result in a loss of contro<span class=\"_ _2\"></span>l are accounted for as equity transactions.<span class=\"_ _e\"></span> ASSOCIAT<span class=\"ls43\">ES</span> Associates are<span class=\"_ _2\"></span> those companies over which the Compan<span class=\"_ _e\"></span>y exerts significant in<span class=\"_ _2\"></span>fluence, but not control, in <span class=\"_ _e\"></span>terms of the<span class=\"ls1c\">ir</span> financial and opera<span class=\"_ _2\"></span>ting policies. Investments in associates are account<span class=\"_ _e\"></span>ed for in the consolida<span class=\"_ _2\"></span>ted financial statements in accordance with t<span class=\"_ _e\"></span>he equity method. They ar<span class=\"_ _2\"></span>e initially recognised in the consolidated statement of financial position at cost, with all transaction costs incurred with the acqu<span class=\"_ _2\"></span>isition included, and are adjusted t<span class=\"_ _e\"></span>hereafter to reflect the g<span class=\"ff42\">roup\u2019s share of the profit or loss and other comprehensive income of </span>the associa<span class=\"_ _2\"></span>te. This accounting under the equity method is<span class=\"_ _e\"></span> done from the date that sign<span class=\"_ _2\"></span>ificant influence commences until the<span class=\"_ _e\"></span> date that it ceases. When the group's share of the losses e<span class=\"_ _2\"></span>xceeds its interest in an associate, its carrying amount is reduced to ni<span class=\"_ _e\"></span>l and further losses are<span class=\"_ _2\"></span> not recognised except to the extent t<span class=\"_ _e\"></span>hat the group ha<span class=\"_ _2\"></span>s incurred legal or constructive obligations or has <span class=\"_ _e\"></span>made payments on behalf o<span class=\"_ _2\"></span>f an associate. INTERESTS IN JOINT VENTURES  A joint venture is an arrangement under which t<span class=\"_ _2\"></span>he gr<span class=\"_ _e\"></span>oup has joint control and has rights to the net assets of the<span class=\"_ _2\"></span> arrangement, as opposed to join<span class=\"_ _2\"></span>t operations, under which the g<span class=\"_ _e\"></span>roup has rights to its assets and ob<span class=\"_ _2\"></span>ligations for its liabilities. Interests in joint ventures are accounted for<span class=\"_ _2\"></span> using the equity method. They are initially r<span class=\"_ _e\"></span>ecognised<span class=\"_ _2\"></span> at cost price, with all transaction costs incurred with the acquisition included. <span class=\"_ _2\"></span>Subsequent to initial recognition, the consolidated financial statements include the gr<span class=\"_ _e\"></span>oup's share of the total recognised profits and losses of joint <span class=\"_ _2\"></span>ventures on the basis of the equity method, from the date that joint control commences until the <span class=\"_ _e\"></span>date that it cea<span class=\"_ _2\"></span>ses. When the group's shar<span class=\"_ _2\"></span>e of the losses exceeds its interest<span class=\"_ _e\"></span> in joint ventures,<span class=\"_ _2\"></span> its carrying amount is reduced to nil and<span class=\"_ _e\"></span> furthe<span class=\"_ _e\"></span>r losses are not re<span class=\"_ _2\"></span>cognised except to the extent that the <span class=\"_ _e\"></span>group has incurre<span class=\"_ _2\"></span>d legal or constructive obligations or has made payments on behalf of a joint venture<span class=\"ls1d\">. </span> N<span class=\"ls101\">ON</span>-CONTROLING INTERESTS  Non-controlling in<span class=\"_ _2\"></span>terests are measured in line with their pr<span class=\"_ _e\"></span>oportional share of the acquiree's identifiable net assets on the acquisition date.  LOSS OF CONTROL Upon the<span class=\"_ _2\"></span> loss of control, the group derecognis<span class=\"_ _e\"></span>es the assets and liabilities of the subsidiary, any non-controlling interests and the other components o<span class=\"_ _2\"></span>f other comprehensive income related to the subsidiary. Any surplus or deficit arising on the loss of control is recogn<span class=\"_ _2\"></span>i<span class=\"_ _e\"></span>s<span class=\"_ _e\"></span><span class=\"ls5b\">ed </span>in profit or loss.<span class=\"_ _2\"></span> If the group retains any interest in the fo<span class=\"_ _e\"></span>rmer subsidiary, then such interest is measured at fair value <span class=\"_ _e\"></span><span class=\"ls5b\">on </span>the date that control is lo<span class=\"_ _2\"></span>st. Subsequently, it is accounted for as an equ<span class=\"_ _e\"></span>ity-accounted investee or as a fair value financial asset depending on the level of influen<span class=\"_ _2\"></span>ce retained. ELIMINATION OF INTRA-GROUP TRANSACTIONS Intra-group ba<span class=\"_ _2\"></span>lances and any unrealised gains or losses <span class=\"_ _e\"></span>or income and expenses arising from intra-group transactions are eliminated when prepar<span class=\"_ _2\"></span>ing the consolidated financial statements. <span class=\"_ _e\"></span> Unrealised<span class=\"_ _2\"></span> gains from transactions with associates <span class=\"_ _e\"></span>are eliminated to the extent of the group's interest in the entity. Unrealised losses are eliminated<span class=\"_ _2\"></span> in the same way as unrealised gains, but only to the extent that there is no evidence of<span class=\"_ _e\"></span> impairment.<span class=\"_ _e\"></span> BUSINESS COMBINA<span class=\"_ _2\"></span>TION AND GOODWILL<span class=\"_ _e\"></span> Goodwill arise<span class=\"_ _2\"></span>s on the acquisition of subsidiaries<span class=\"_ _e\"></span> <span class=\"ls5b\">and </span>repr<span class=\"_ _e\"></span>esents the excess of the consideration transferred over the group's interest in the net fair va<span class=\"_ _2\"></span>lue of the net identifiable assets, liabilities and contingent liabilities of the acquiree. The group<span class=\"_ _2\"></span> measures goodwill <span class=\"ls5b\">on</span> <span class=\"_ _e\"></span>the acquisition date as:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the f<span class=\"_ _2\"></span>air value of the consideration transferred; plus </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the r<span class=\"_ _2\"></span>ecognised amount of any non-controlling interest in the acquiree; plus<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">if the b<span class=\"_ _2\"></span>usiness combination is completed in stages, the fai<span class=\"_ _e\"></span>r value of the pre-existing equity interest in the acquiree; less </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the f<span class=\"_ _2\"></span>air value of the identifiable assets acquired and liabilities at acquisition date.<span class=\"_ _e\"></span> </span></span>When the excess is n<span class=\"_ _2\"></span>egative, a gain on a bar<span class=\"_ _e\"></span>gain purchase is recognised immed<span class=\"_ _2\"></span>iately in profit or loss.<span class=\"_ _e\"></span> The consider<span class=\"_ _2\"></span>ation transferred does not include amounts related to the settleme<span class=\"_ _e\"></span>nt of pre-existing relationships. Such amounts are generally reco<span class=\"_ _2\"></span>gnised in profit or loss.<span class=\"_ _e\"></span> Transa<span class=\"_ _2\"></span>ction costs incurred by the group in connection with a business combination, other th<span class=\"_ _e\"></span>an those associated with the issue of debt or equity securities, are expensed as incurred. Any contingent con<span class=\"_ _2\"></span>sideration payable is measured at fair value at the acquisition date. If the contingent consideration is classified as equity, then it is not remea<span class=\"_ _2\"></span>sured and settlement is accounted for within equity. Otherwise, subsequ<span class=\"_ _e\"></span>ent changes in the fair value of the contingent consideration are re<span class=\"_ _2\"></span>cognised in profit or loss.3.2. <span class=\"_ _87\"> </span>Foreign cu<span class=\"_ _e\"></span>rrency translati<span class=\"_ _2\"></span>on FOREIGN CURRENCY TRANSAC<span class=\"_ _2\"></span>TIONS AND BALANCES <span class=\"_ _e\"></span> Transa<span class=\"_ _2\"></span>ctions in foreign currencies are converted into the f<span class=\"_ _e\"></span>unctional currency of the Company <span class=\"_ _2\"></span>at the foreign exchan<span class=\"_ _e\"></span>ge rate on the date of the transaction<span class=\"_ _2\"></span>. Monetary assets and liabilities denominated in foreign currencies on the <span class=\"_ _e\"></span>reporting date are converted at the foreign exchange rate on that date. For<span class=\"_ _2\"></span>eign exchange differences arising on conversion are recognised in profit or loss.<span class=\"_ _e\"></span> Non-monetar<span class=\"_ _2\"></span>y assets and liabilities denominated in foreign currencies that are valued in terms of historical cost are converted <span class=\"_ _e\"></span>at the exchange rate on the d<span class=\"_ _2\"></span>ate of the transaction.<span class=\"_ _e\"></span> FOREIGN OPERATIONS A foreign operation is an en<span class=\"_ _2\"></span>tity that is a subsidiary, an ass<span class=\"_ _e\"></span>ociate, an interest in a joint venture or <span class=\"ls78\">a </span>b<span class=\"_ _2\"></span>ranch of the reporting entity whose activities are<span class=\"_ _2\"></span> based or conducted in a count<span class=\"_ _e\"></span>ry or currency other than those of the reporting entity. The financial sta<span class=\"_ _2\"></span>tements of all group entities that have a f<span class=\"_ _e\"></span>unctional currency which differ from the group's presentation currency are translated into<span class=\"_ _2\"></span> the presentation currency as follows:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">assets a<span class=\"_ _2\"></span>nd liabilities are translated at the exchange rate at the reporting date;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">income<span class=\"_ _2\"></span> and expenses are translated at the average exchange rate of the year. </span></span>Exchange d<span class=\"_ _2\"></span>ifferences arising from the translation of the net investment in foreign subsidiaries, i<span class=\"_ _e\"></span>nterests in joint ventures and associates at closing e<span class=\"_ _2\"></span>xchange rates are included in shareholder's e<span class=\"_ _e\"></span>quity under OCI. Upon the (partial) disposal of foreign subsidiaries, joint venture<span class=\"_ _2\"></span>s and associates, (partial) cumulative translation a<span class=\"_ _e\"></span>djustments are recognised in the profit or loss as part of the gain or loss on the sale.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBasisOfConsolidationExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__145": {
   "value": "SUBSIDIARIES A subsidiary is a<span class=\"_ _2\"></span>n entity that is controlled by the Compan<span class=\"_ _e\"></span>y. The group controls an entity when it is exposed, or has rights, to variable return<span class=\"_ _2\"></span>s from its involvement with the entity and has the abil<span class=\"_ _e\"></span>ity to affe<span class=\"_ _2\"></span>ct those returns th<span class=\"_ _e\"></span>rough its power over the entity. The financial statements of <span class=\"_ _2\"></span>subsidiaries are included in the consolidated financial st<span class=\"_ _e\"></span>atements from the date this control commences until the date that it ceases. The a<span class=\"_ _2\"></span>ccounting policies of subsidiaries are changed when necessary, in order to align them with the policies adopted by the group<span class=\"_ _2\"></span>. Losses applicable to the non-controlling interests in a subsidiary are allocated to the non-controlling interest<span class=\"_ _e\"></span>s even if th<span class=\"_ _2\"></span>is results in a deficit <span class=\"_ _2\"></span>balance of the non-controlling interests.<span class=\"_ _e\"></span> Changes <span class=\"ls1d\">to</span> the group's interest in a non-wholly-owned subsidiary that do not result in a loss of contro<span class=\"_ _2\"></span>l are accounted for as equity transactions.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForSubsidiariesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__147": {
   "value": "ASSOCIAT<span class=\"ls43\">ES</span> Associates are<span class=\"_ _2\"></span> those companies over which the Compan<span class=\"_ _e\"></span>y exerts significant in<span class=\"_ _2\"></span>fluence, but not control, in <span class=\"_ _e\"></span>terms of the<span class=\"ls1c\">ir</span> financial and opera<span class=\"_ _2\"></span>ting policies. Investments in associates are account<span class=\"_ _e\"></span>ed for in the consolida<span class=\"_ _2\"></span>ted financial statements in accordance with t<span class=\"_ _e\"></span>he equity method. They ar<span class=\"_ _2\"></span>e initially recognised in the consolidated statement of financial position at cost, with all transaction costs incurred with the acqu<span class=\"_ _2\"></span>isition included, and are adjusted t<span class=\"_ _e\"></span>hereafter to reflect the g<span class=\"ff42\">roup\u2019s share of the profit or loss and other comprehensive income of </span>the associa<span class=\"_ _2\"></span>te. This accounting under the equity method is<span class=\"_ _e\"></span> done from the date that sign<span class=\"_ _2\"></span>ificant influence commences until the<span class=\"_ _e\"></span> date that it ceases. When the group's share of the losses e<span class=\"_ _2\"></span>xceeds its interest in an associate, its carrying amount is reduced to ni<span class=\"_ _e\"></span>l and further losses are<span class=\"_ _2\"></span> not recognised except to the extent t<span class=\"_ _e\"></span>hat the group ha<span class=\"_ _2\"></span>s incurred legal or constructive obligations or has <span class=\"_ _e\"></span>made payments on behalf o<span class=\"_ _2\"></span>f an associate.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForInvestmentInAssociates",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__146": {
   "value": "ASSOCIAT<span class=\"ls43\">ES</span> Associates are<span class=\"_ _2\"></span> those companies over which the Compan<span class=\"_ _e\"></span>y exerts significant in<span class=\"_ _2\"></span>fluence, but not control, in <span class=\"_ _e\"></span>terms of the<span class=\"ls1c\">ir</span> financial and opera<span class=\"_ _2\"></span>ting policies. Investments in associates are account<span class=\"_ _e\"></span>ed for in the consolida<span class=\"_ _2\"></span>ted financial statements in accordance with t<span class=\"_ _e\"></span>he equity method. They ar<span class=\"_ _2\"></span>e initially recognised in the consolidated statement of financial position at cost, with all transaction costs incurred with the acqu<span class=\"_ _2\"></span>isition included, and are adjusted t<span class=\"_ _e\"></span>hereafter to reflect the g<span class=\"ff42\">roup\u2019s share of the profit or loss and other comprehensive income of </span>the associa<span class=\"_ _2\"></span>te. This accounting under the equity method is<span class=\"_ _e\"></span> done from the date that sign<span class=\"_ _2\"></span>ificant influence commences until the<span class=\"_ _e\"></span> date that it ceases. When the group's share of the losses e<span class=\"_ _2\"></span>xceeds its interest in an associate, its carrying amount is reduced to ni<span class=\"_ _e\"></span>l and further losses are<span class=\"_ _2\"></span> not recognised except to the extent t<span class=\"_ _e\"></span>hat the group ha<span class=\"_ _2\"></span>s incurred legal or constructive obligations or has <span class=\"_ _e\"></span>made payments on behalf o<span class=\"_ _2\"></span>f an associate. INTERESTS IN JOINT VENTURES  A joint venture is an arrangement under which t<span class=\"_ _2\"></span>he gr<span class=\"_ _e\"></span>oup has joint control and has rights to the net assets of the<span class=\"_ _2\"></span> arrangement, as opposed to join<span class=\"_ _2\"></span>t operations, under which the g<span class=\"_ _e\"></span>roup has rights to its assets and ob<span class=\"_ _2\"></span>ligations for its liabilities. Interests in joint ventures are accounted for<span class=\"_ _2\"></span> using the equity method. They are initially r<span class=\"_ _e\"></span>ecognised<span class=\"_ _2\"></span> at cost price, with all transaction costs incurred with the acquisition included. <span class=\"_ _2\"></span>Subsequent to initial recognition, the consolidated financial statements include the gr<span class=\"_ _e\"></span>oup's share of the total recognised profits and losses of joint <span class=\"_ _2\"></span>ventures on the basis of the equity method, from the date that joint control commences until the <span class=\"_ _e\"></span>date that it cea<span class=\"_ _2\"></span>ses. When the group's shar<span class=\"_ _2\"></span>e of the losses exceeds its interest<span class=\"_ _e\"></span> in joint ventures,<span class=\"_ _2\"></span> its carrying amount is reduced to nil and<span class=\"_ _e\"></span> furthe<span class=\"_ _e\"></span>r losses are not re<span class=\"_ _2\"></span>cognised except to the extent that the <span class=\"_ _e\"></span>group has incurre<span class=\"_ _2\"></span>d legal or constructive obligations or has made payments on behalf of a joint venture<span class=\"ls1d\">. </span> N<span class=\"ls101\">ON</span>-CONTROLING INTERESTS",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForInvestmentInAssociatesAndJointVenturesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__148": {
   "value": "INTERESTS IN JOINT VENTURES  A joint venture is an arrangement under which t<span class=\"_ _2\"></span>he gr<span class=\"_ _e\"></span>oup has joint control and has rights to the net assets of the<span class=\"_ _2\"></span> arrangement, as opposed to join<span class=\"_ _2\"></span>t operations, under which the g<span class=\"_ _e\"></span>roup has rights to its assets and ob<span class=\"_ _2\"></span>ligations for its liabilities. Interests in joint ventures are accounted for<span class=\"_ _2\"></span> using the equity method. They are initially r<span class=\"_ _e\"></span>ecognised<span class=\"_ _2\"></span> at cost price, with all transaction costs incurred with the acquisition included. <span class=\"_ _2\"></span>Subsequent to initial recognition, the consolidated financial statements include the gr<span class=\"_ _e\"></span>oup's share of the total recognised profits and losses of joint <span class=\"_ _2\"></span>ventures on the basis of the equity method, from the date that joint control commences until the <span class=\"_ _e\"></span>date that it cea<span class=\"_ _2\"></span>ses. When the group's shar<span class=\"_ _2\"></span>e of the losses exceeds its interest<span class=\"_ _e\"></span> in joint ventures,<span class=\"_ _2\"></span> its carrying amount is reduced to nil and<span class=\"_ _e\"></span> furthe<span class=\"_ _e\"></span>r losses are not re<span class=\"_ _2\"></span>cognised except to the extent that the <span class=\"_ _e\"></span>group has incurre<span class=\"_ _2\"></span>d legal or constructive obligations or has made payments on behalf of a joint venture<span class=\"ls1d\">. </span> N<span class=\"ls101\">ON</span>-CONTROLING INTERESTS",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForInvestmentsInJointVentures",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__149": {
   "value": "N<span class=\"ls101\">ON</span>-CONTROLING INTERESTS  Non-controlling in<span class=\"_ _2\"></span>terests are measured in line with their pr<span class=\"_ _e\"></span>oportional share of the acquiree's identifiable net assets on the acquisition date.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForTransactionsWithNoncontrollingInterestsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__150": {
   "value": "BUSINESS COMBINA<span class=\"_ _2\"></span>TION AND GOODWILL<span class=\"_ _e\"></span> Goodwill arise<span class=\"_ _2\"></span>s on the acquisition of subsidiaries<span class=\"_ _e\"></span> <span class=\"ls5b\">and </span>repr<span class=\"_ _e\"></span>esents the excess of the consideration transferred over the group's interest in the net fair va<span class=\"_ _2\"></span>lue of the net identifiable assets, liabilities and contingent liabilities of the acquiree. The group<span class=\"_ _2\"></span> measures goodwill <span class=\"ls5b\">on</span> <span class=\"_ _e\"></span>the acquisition date as:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the f<span class=\"_ _2\"></span>air value of the consideration transferred; plus </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the r<span class=\"_ _2\"></span>ecognised amount of any non-controlling interest in the acquiree; plus<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">if the b<span class=\"_ _2\"></span>usiness combination is completed in stages, the fai<span class=\"_ _e\"></span>r value of the pre-existing equity interest in the acquiree; less </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the f<span class=\"_ _2\"></span>air value of the identifiable assets acquired and liabilities at acquisition date.<span class=\"_ _e\"></span> </span></span>When the excess is n<span class=\"_ _2\"></span>egative, a gain on a bar<span class=\"_ _e\"></span>gain purchase is recognised immed<span class=\"_ _2\"></span>iately in profit or loss.<span class=\"_ _e\"></span> The consider<span class=\"_ _2\"></span>ation transferred does not include amounts related to the settleme<span class=\"_ _e\"></span>nt of pre-existing relationships. Such amounts are generally reco<span class=\"_ _2\"></span>gnised in profit or loss.<span class=\"_ _e\"></span> Transa<span class=\"_ _2\"></span>ction costs incurred by the group in connection with a business combination, other th<span class=\"_ _e\"></span>an those associated with the issue of debt or equity securities, are expensed as incurred. Any contingent con<span class=\"_ _2\"></span>sideration payable is measured at fair value at the acquisition date. If the contingent consideration is classified as equity, then it is not remea<span class=\"_ _2\"></span>sured and settlement is accounted for within equity. Otherwise, subsequ<span class=\"_ _e\"></span>ent changes in the fair value of the contingent consideration are re<span class=\"_ _2\"></span>cognised in profit or loss.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForBusinessCombinationsAndGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__151": {
   "value": "3.2. <span class=\"_ _87\"> </span>Foreign cu<span class=\"_ _e\"></span>rrency translati<span class=\"_ _2\"></span>on FOREIGN CURRENCY TRANSAC<span class=\"_ _2\"></span>TIONS AND BALANCES <span class=\"_ _e\"></span> Transa<span class=\"_ _2\"></span>ctions in foreign currencies are converted into the f<span class=\"_ _e\"></span>unctional currency of the Company <span class=\"_ _2\"></span>at the foreign exchan<span class=\"_ _e\"></span>ge rate on the date of the transaction<span class=\"_ _2\"></span>. Monetary assets and liabilities denominated in foreign currencies on the <span class=\"_ _e\"></span>reporting date are converted at the foreign exchange rate on that date. For<span class=\"_ _2\"></span>eign exchange differences arising on conversion are recognised in profit or loss.<span class=\"_ _e\"></span> Non-monetar<span class=\"_ _2\"></span>y assets and liabilities denominated in foreign currencies that are valued in terms of historical cost are converted <span class=\"_ _e\"></span>at the exchange rate on the d<span class=\"_ _2\"></span>ate of the transaction.<span class=\"_ _e\"></span> FOREIGN OPERATIONS A foreign operation is an en<span class=\"_ _2\"></span>tity that is a subsidiary, an ass<span class=\"_ _e\"></span>ociate, an interest in a joint venture or <span class=\"ls78\">a </span>b<span class=\"_ _2\"></span>ranch of the reporting entity whose activities are<span class=\"_ _2\"></span> based or conducted in a count<span class=\"_ _e\"></span>ry or currency other than those of the reporting entity. The financial sta<span class=\"_ _2\"></span>tements of all group entities that have a f<span class=\"_ _e\"></span>unctional currency which differ from the group's presentation currency are translated into<span class=\"_ _2\"></span> the presentation currency as follows:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">assets a<span class=\"_ _2\"></span>nd liabilities are translated at the exchange rate at the reporting date;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">income<span class=\"_ _2\"></span> and expenses are translated at the average exchange rate of the year. </span></span>Exchange d<span class=\"_ _2\"></span>ifferences arising from the translation of the net investment in foreign subsidiaries, i<span class=\"_ _e\"></span>nterests in joint ventures and associates at closing e<span class=\"_ _2\"></span>xchange rates are included in shareholder's e<span class=\"_ _e\"></span>quity under OCI. Upon the (partial) disposal of foreign subsidiaries, joint venture<span class=\"_ _2\"></span>s and associates, (partial) cumulative translation a<span class=\"_ _e\"></span>djustments are recognised in the profit or loss as part of the gain or loss on the sale.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForForeignCurrencyTranslationExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__152": {
   "value": "3.3.1 <span class=\"_ _36\"> </span>Property, plant and equipment Owned <span class=\"_ _e\"></span>assets Items of property, plant <span class=\"_ _2\"></span>and equipment a<span class=\"_ _e\"></span>re stated at historical cost (including the directly allocated costs such as finance costs), less accumulated depre<span class=\"_ _2\"></span>ciation and impairment losses (see Se<span class=\"_ _e\"></span>ction 3.3.7. 'Impairment of non-financial assets'). The cost of self-produced assets comprises the cost<span class=\"_ _2\"></span> of materials, direct labour and, where relevant, the initial estimate of the cost<span class=\"_ _2\"></span>s of dismant<span class=\"_ _e\"></span>ling and <span class=\"_ _e\"></span>removing the assets<span class=\"_ _2\"></span> and restoring the site on which the assets wer<span class=\"_ _e\"></span>e located. If parts of an item of property, plant and equipment have different useful lives, t<span class=\"_ _2\"></span>hey are accounted for as separate items of property, plant and equipment.<span class=\"_ _e\"></span> Borrowing c<span class=\"_ _2\"></span>osts that are directly attributable to the construction of the qualifying asset are capitalis<span class=\"_ _e\"></span>ed as part of the cost of <span class=\"_ _2\"></span>that asset. <span class=\"_ _e\"></span> Subsequen<span class=\"_ _e\"></span>t costs The Group recognises in t<span class=\"_ _2\"></span>he carrying amount of an item of property, plant and equipment the subsequent costs of replacing par<span class=\"_ _e\"></span>t of such an item when that cost<span class=\"_ _2\"></span> is incurred, but only when it is pro<span class=\"_ _e\"></span>bable that the future economic benefit<span class=\"_ _2\"></span>s embodied in the item w<span class=\"_ _e\"></span>ill flow to the Group and t<span class=\"_ _2\"></span>he cost of the item can be measured reliably. All other costs, such as repair and maintenance costs, are recognised in <span class=\"_ _e\"></span>profit or loss as and when th<span class=\"_ _2\"></span>ey are incurred.<span class=\"_ _e\"></span> Depr<span class=\"_ _e\"></span>eciation Depreciation is re<span class=\"_ _2\"></span>cognised in profit or loss on a straight-li<span class=\"_ _e\"></span>ne basis over the estimated useful life of each component of an item of property, plant and eq<span class=\"_ _2\"></span>uipment. Land is not depreciated. The applied depreciation percentages can be found in the <span class=\"_ _e\"></span>bullet points below. Depreciation me<span class=\"_ _2\"></span>thods, remaining useful lives a<span class=\"_ _e\"></span>nd residual values of property, p<span class=\"_ _2\"></span>lant and equipment are reassessed annually and are prospe<span class=\"_ _2\"></span>ctively adjusted as the occasion arises.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Administr<span class=\"_ _2\"></span>ative buildings <span class=\"_ _20\"></span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>1.67 <span class=\"ff42\">\u2013</span> 2.00%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Indu<span class=\"_ _2\"></span>strial buildings <span class=\"_ _14d\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>2.00 <span class=\"ff42\">\u2013</span> 4.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Overh<span class=\"_ _2\"></span>ead lines <span class=\"_ _a6\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>2.00 <span class=\"ff42\">\u2013</span> 4.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Under<span class=\"_ _2\"></span>ground cables <span class=\"_ _62\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>2.00 <span class=\"ff42\">\u2013</span> 5.00%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Substatio<span class=\"_ _2\"></span>ns (facilities and machines) <span class=\"_ _a2\"> </span> <span class=\"_ _121\"> </span>2.50 <span class=\"ff42\">\u2013</span> 6.67% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Remote<span class=\"_ _2\"></span> control <span class=\"_ _13e\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span>3.00 <span class=\"ff42\">\u2013</span> 12.50<span class=\"_ _2\"></span>%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Dispatchin<span class=\"_ _2\"></span>g <span class=\"_ _7b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>4.00 <span class=\"ff42\">\u2013</span> 10.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Other<span class=\"_ _2\"></span> PPE (fitting out rented buildings)<span class=\"_ _e\"></span> <span class=\"_ _235\"> </span> <span class=\"_ _121\"> </span>contr<span class=\"_ _2\"></span>actual period </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Vehicles <span class=\"_ _139\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span>6.67 <span class=\"ff42\">\u2013<span class=\"_ _2\"></span><span class=\"ff3f\"> 20.00% </span></span></span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Too<span class=\"_ _2\"></span>ls and office furniture <span class=\"_ _12\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>6.67 <span class=\"ff42\">\u2013</span> 20.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Hardwa<span class=\"_ _2\"></span>re <span class=\"_ _14b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>25.00 <span class=\"ff42\">\u2013</span> 33.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Right o<span class=\"_ _2\"></span>f use assets <span class=\"_ _14e\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>contractual period </span></span>Decommi<span class=\"_ _e\"></span>ssioning an <span class=\"lsff\">asset</span> In accordance<span class=\"_ _2\"></span> with IAS 16, when the entity has a present,<span class=\"_ _e\"></span> legal or<span class=\"_ _2\"></span> constructive obligation to dismantle the item or restore t<span class=\"_ _e\"></span>he site, the initial cost of <span class=\"_ _2\"></span>the item of property, plant and equipment includes an initial estimate of the costs of dismantling and <span class=\"_ _e\"></span>removing the item and restoring the<span class=\"_ _2\"></span> site on which it is located. A corresponding provision for this obligation is recorded for the amount of the as<span class=\"_ _e\"></span>set component (the d<span class=\"_ _2\"></span>ismantling asset) and depreciated over <span class=\"_ _e\"></span>the asset's entire useful life (see also 3.3.13 Provisions).<span class=\"_ _e\"></span> Derecognition An asset is no<span class=\"_ _2\"></span> longer recognised when it is s<span class=\"_ _e\"></span>ubject to disposal or when no future economic benefits are expected from its u<span class=\"_ _2\"></span>se or disposal. Ga<span class=\"_ _2\"></span>ins or losses arising from the derecognition of the asset (determined as the difference b<span class=\"_ _e\"></span>etween the net disposal proceeds and the carr<span class=\"_ _2\"></span>ying amount of the asset) are included in profit or loss, under other income<span class=\"_ _e\"></span> or other expenses, during the year in which the asset was derecognised.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForPropertyPlantAndEquipmentExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__153": {
   "value": "Subsequen<span class=\"_ _e\"></span>t costs The Group recognises in t<span class=\"_ _2\"></span>he carrying amount of an item of property, plant and equipment the subsequent costs of replacing par<span class=\"_ _e\"></span>t of such an item when that cost<span class=\"_ _2\"></span> is incurred, but only when it is pro<span class=\"_ _e\"></span>bable that the future economic benefit<span class=\"_ _2\"></span>s embodied in the item w<span class=\"_ _e\"></span>ill flow to the Group and t<span class=\"_ _2\"></span>he cost of the item can be measured reliably. All other costs, such as repair and maintenance costs, are recognised in <span class=\"_ _e\"></span>profit or loss as and when th<span class=\"_ _2\"></span>ey are incurred.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForRepairsAndMaintenanceExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__200-1": {
   "value": "Depr<span class=\"_ _e\"></span>eciation Depreciation is re<span class=\"_ _2\"></span>cognised in profit or loss on a straight-li<span class=\"_ _e\"></span>ne basis over the estimated useful life of each component of an item of property, plant and eq<span class=\"_ _2\"></span>uipment. Land is not depreciated. The applied depreciation percentages can be found in the <span class=\"_ _e\"></span>bullet points below. Depreciation me<span class=\"_ _2\"></span>thods, remaining useful lives a<span class=\"_ _e\"></span>nd residual values of property, p<span class=\"_ _2\"></span>lant and equipment are reassessed annually and are prospe<span class=\"_ _2\"></span>ctively adjusted as the occasion arises.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Administr<span class=\"_ _2\"></span>ative buildings <span class=\"_ _20\"></span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>1.67 <span class=\"ff42\">\u2013</span> 2.00%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Indu<span class=\"_ _2\"></span>strial buildings <span class=\"_ _14d\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>2.00 <span class=\"ff42\">\u2013</span> 4.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Overh<span class=\"_ _2\"></span>ead lines <span class=\"_ _a6\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>2.00 <span class=\"ff42\">\u2013</span> 4.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Under<span class=\"_ _2\"></span>ground cables <span class=\"_ _62\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>2.00 <span class=\"ff42\">\u2013</span> 5.00%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Substatio<span class=\"_ _2\"></span>ns (facilities and machines) <span class=\"_ _a2\"> </span> <span class=\"_ _121\"> </span>2.50 <span class=\"ff42\">\u2013</span> 6.67% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Remote<span class=\"_ _2\"></span> control <span class=\"_ _13e\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span>3.00 <span class=\"ff42\">\u2013</span> 12.50<span class=\"_ _2\"></span>%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Dispatchin<span class=\"_ _2\"></span>g <span class=\"_ _7b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>4.00 <span class=\"ff42\">\u2013</span> 10.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Other<span class=\"_ _2\"></span> PPE (fitting out rented buildings)<span class=\"_ _e\"></span> <span class=\"_ _235\"> </span> <span class=\"_ _121\"> </span>contr<span class=\"_ _2\"></span>actual period </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Vehicles <span class=\"_ _139\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span>6.67 <span class=\"ff42\">\u2013<span class=\"_ _2\"></span><span class=\"ff3f\"> 20.00% </span></span></span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Too<span class=\"_ _2\"></span>ls and office furniture <span class=\"_ _12\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>6.67 <span class=\"ff42\">\u2013</span> 20.00% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Hardwa<span class=\"_ _2\"></span>re <span class=\"_ _14b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>25.00 <span class=\"ff42\">\u2013</span> 33.00% </span></span>\u2022 <span class=\"_ _1dc\"> </span>Right o<span class=\"_ _2\"></span>f use assets <span class=\"_ _14e\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>contractual periodAmortisation Amortisation<span class=\"_ _2\"></span> is recognised in profit or loss on a straight-li<span class=\"_ _e\"></span>ne basis over the estimated useful life of intangible assets, unless the useful life is indefinite<span class=\"_ _2\"></span>. Goodwill and intangible assets with indefinite useful lives are tested systematically for impairment on e<span class=\"_ _e\"></span>ach end of the repor<span class=\"_ _2\"></span>ting period. Software is amortised from the date it b<span class=\"_ _e\"></span>ecomes available for use. The estimated useful lives are as follows: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Licence<span class=\"_ _2\"></span>s <span class=\"_ _13b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>20.00%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Concessio<span class=\"_ _2\"></span>ns <span class=\"_ _59\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>contractual period </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Compu<span class=\"_ _2\"></span>ter software <span class=\"_ _13b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span><span class=\"ls1d\">   </span>20.00 <span class=\"ff42\">\u2013</span> 25.00% </span></span>Depreciation me<span class=\"_ _2\"></span>thods, remaining useful lives and residual<span class=\"_ _e\"></span> values of <span class=\"_ _2\"></span>intangible assets are reassessed annually and are prospectively adjusted as the<span class=\"_ _2\"></span> occasion arises.Right of use assets are subsequently reduced by a<span class=\"_ _2\"></span>ccumul<span class=\"_ _e\"></span>ated depre<span class=\"_ _2\"></span>ciation, impairment losses and any adjustment<span class=\"_ _e\"></span>s resulting<span class=\"_ _2\"></span> from the remea<span class=\"_ _2\"></span>surement of the lease liability. <span class=\"_ _e\"></span>These assets are depreciated using the straight-line method from the commencement date to the end of <span class=\"_ _2\"></span>the lease term, unless the lease transfers ownership <span class=\"_ _e\"></span>of the underlying asset to the group by the end of the lease term or the cost of the right-<span class=\"ls5b\">of</span>-use asset reflects the fact that the group will exercise a purchase option. In that case the right-<span class=\"ls5b\">of</span>-use asset will b<span class=\"ls5b\">e </span>depre<span class=\"_ _2\"></span>ciated over the useful life of the underlying asset, which is determined on the same basis as that of property <span class=\"_ _e\"></span>and equipment.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDepreciationExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__154-1": {
   "value": "Decommi<span class=\"_ _e\"></span>ssioning an <span class=\"lsff\">asset</span> In accordance<span class=\"_ _2\"></span> with IAS 16, when the entity has a present,<span class=\"_ _e\"></span> legal or<span class=\"_ _2\"></span> constructive obligation to dismantle the item or restore t<span class=\"_ _e\"></span>he site, the initial cost of <span class=\"_ _2\"></span>the item of property, plant and equipment includes an initial estimate of the costs of dismantling and <span class=\"_ _e\"></span>removing the item and restoring the<span class=\"_ _2\"></span> site on which it is located. A corresponding provision for this obligation is recorded for the amount of the as<span class=\"_ _e\"></span>set component (the d<span class=\"_ _2\"></span>ismantling asset) and depreciated over <span class=\"_ _e\"></span>the asset's entire useful life (see also 3.3.13 Provisions).The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s main long<span class=\"ff3f\">-term provisions <span class=\"_ _e\"></span>are provisions for dismantling<span class=\"_ _2\"></span> obligations. The present value of the obligation at the time of </span></span>commissioning re<span class=\"_ _2\"></span>presents the initial amount of the provision for dismantling with, as the counterpart, an asset for the same <span class=\"_ _e\"></span>amount, which is included<span class=\"_ _2\"></span> in the carrying amount of the related pro<span class=\"_ _e\"></span>perty, plant and equipment and is depreciated over the asset'<span class=\"_ _e\"></span>s entire useful life.  Factor<span class=\"_ _2\"></span>s having a significant influence on the amount of provisions include: <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">cost est<span class=\"_ _2\"></span>imates <span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the t<span class=\"_ _2\"></span>iming of expenditure ; and  </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the d<span class=\"_ _2\"></span>iscount rate applied to cash flows. </span></span>These factor<span class=\"_ _2\"></span>s are based on information and estimates de<span class=\"_ _e\"></span>emed b<span class=\"_ _2\"></span>y the g<span class=\"_ _e\"></span>roup to be the most appropriate as of today.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDecommissioningRestorationAndRehabilitationProvisionsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__156-1": {
   "value": "3.3.2 <span class=\"_ _36\"> </span>Intangible assets Computer software Software licen<span class=\"_ _2\"></span>ces acquired by the group are stated at cost, less accumulated amortisation (see below) and impairment losses (see Section 3.3.7. 'Impairmen<span class=\"_ _2\"></span>t'<span class=\"ls8f\">).<span class=\"_ _e\"></span></span> Expenditur<span class=\"_ _2\"></span>e <span class=\"ls5b\">on <span class=\"_ _e\"></span></span>research activities undertaken with the purpose of developing software within the group is recognised in profit or loss as it is incurred. Expenditure<span class=\"_ _2\"></span> related to the d<span class=\"_ _e\"></span>evelopment phase of software developed within the group is capitalised if:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the co<span class=\"_ _2\"></span>sts of development can be measured reliably;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the so<span class=\"_ _2\"></span>ftware is technically and commercially feasible and future economic benefits are probable;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the g<span class=\"_ _2\"></span>roup plans <span class=\"ff42\">\u2013</span> and has sufficient resources <span class=\"ff42\">\u2013</span> to complete development;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the g<span class=\"_ _2\"></span>roup plans to use the software. </span></span>The capitalised e<span class=\"_ _2\"></span>xpenditure includes t<span class=\"_ _e\"></span>he cost of material, direct labour<span class=\"_ _2\"></span> costs and overhead costs that are directly attributable to preparing t<span class=\"_ _2\"></span>he software for its use. Other costs are recognised in profit or loss as they are incurred. Licen<span class=\"_ _e\"></span>ces, patents and similar rights<span class=\"_ _2\"></span> Expenditur<span class=\"_ _2\"></span>e on acquired licences, patents, trademarks an<span class=\"_ _e\"></span>d similar r<span class=\"_ _2\"></span>ights are capitalised and amortised on a straight<span class=\"_ _20\"></span>-line b<span class=\"_ _2\"></span>asis over the contractual period, <span class=\"_ _2\"></span>if any, or the estimated useful life.<span class=\"_ _e\"></span> Subsequen<span class=\"_ _e\"></span>t expenditu<span class=\"_ _2\"></span>re Subsequent expenditure on capitalised intang<span class=\"_ _2\"></span>ible assets is capitalised only when it increases the future economic benefits embodied in the specific a<span class=\"_ _2\"></span>sset to which it relates. All other expenditure is recognised in profit or loss as it<span class=\"_ _e\"></span> is incurred. Amortisation Amortisation<span class=\"_ _2\"></span> is recognised in profit or loss on a straight-li<span class=\"_ _e\"></span>ne basis over the estimated useful life of intangible assets, unless the useful life is indefinite<span class=\"_ _2\"></span>. Goodwill and intangible assets with indefinite useful lives are tested systematically for impairment on e<span class=\"_ _e\"></span>ach end of the repor<span class=\"_ _2\"></span>ting period. Software is amortised from the date it b<span class=\"_ _e\"></span>ecomes available for use. The estimated useful lives are as follows: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Licence<span class=\"_ _2\"></span>s <span class=\"_ _13b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>20.00%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Concessio<span class=\"_ _2\"></span>ns <span class=\"_ _59\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>contractual period </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Compu<span class=\"_ _2\"></span>ter software <span class=\"_ _13b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span><span class=\"ls1d\">   </span>20.00 <span class=\"ff42\">\u2013</span> 25.00% </span></span>Depreciation me<span class=\"_ _2\"></span>thods, remaining useful lives and residual<span class=\"_ _e\"></span> values of <span class=\"_ _2\"></span>intangible assets are reassessed annually and are prospectively adjusted as the<span class=\"_ _2\"></span> occasion arises.<span class=\"_ _e\"></span> Derecognition An intangible<span class=\"_ _2\"></span> asset is derecognised upon disposal (i.e., the date <span class=\"_ _e\"></span>upon which the recipient obtains control of it) or wh<span class=\"_ _e\"></span>en no future econom<span class=\"_ _2\"></span>ic benefits are expected from its use or disposal. Any gain or loss arising upon derecognition of the asset (calculated as the differen<span class=\"_ _2\"></span>ce between the net disposal proceeds and the carrying amount of the asset) is included in the statement of profit or <span class=\"_ _e\"></span>loss.3.3.3 <span class=\"_ _36\"> </span>Goodwill Goodwill is state<span class=\"_ _2\"></span>d at cost, less accumulated impairment l<span class=\"_ _e\"></span>osses. Goodwill is allocated to cash-generating units and is not amortised but is tested annua<span class=\"_ _2\"></span>lly for impairment (see Section <span class=\"_ _e\"></span>3.3.7 'Impairment of non-financial assets'). In the case of associates, the carrying amount of good<span class=\"_ _2\"></span>will is included in the carrying amount of the invest<span class=\"_ _e\"></span>ment in the a<span class=\"_ _2\"></span>ssociates.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIntangibleAssetsAndGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__155": {
   "value": "3.3.2 <span class=\"_ _36\"> </span>Intangible assets Computer software Software licen<span class=\"_ _2\"></span>ces acquired by the group are stated at cost, less accumulated amortisation (see below) and impairment losses (see Section 3.3.7. 'Impairmen<span class=\"_ _2\"></span>t'<span class=\"ls8f\">).<span class=\"_ _e\"></span></span> Expenditur<span class=\"_ _2\"></span>e <span class=\"ls5b\">on <span class=\"_ _e\"></span></span>research activities undertaken with the purpose of developing software within the group is recognised in profit or loss as it is incurred. Expenditure<span class=\"_ _2\"></span> related to the d<span class=\"_ _e\"></span>evelopment phase of software developed within the group is capitalised if:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the co<span class=\"_ _2\"></span>sts of development can be measured reliably;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the so<span class=\"_ _2\"></span>ftware is technically and commercially feasible and future economic benefits are probable;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the g<span class=\"_ _2\"></span>roup plans <span class=\"ff42\">\u2013</span> and has sufficient resources <span class=\"ff42\">\u2013</span> to complete development;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the g<span class=\"_ _2\"></span>roup plans to use the software. </span></span>The capitalised e<span class=\"_ _2\"></span>xpenditure includes t<span class=\"_ _e\"></span>he cost of material, direct labour<span class=\"_ _2\"></span> costs and overhead costs that are directly attributable to preparing t<span class=\"_ _2\"></span>he software for its use. Other costs are recognised in profit or loss as they are incurred. Licen<span class=\"_ _e\"></span>ces, patents and similar rights<span class=\"_ _2\"></span> Expenditur<span class=\"_ _2\"></span>e on acquired licences, patents, trademarks an<span class=\"_ _e\"></span>d similar r<span class=\"_ _2\"></span>ights are capitalised and amortised on a straight<span class=\"_ _20\"></span>-line b<span class=\"_ _2\"></span>asis over the contractual period, <span class=\"_ _2\"></span>if any, or the estimated useful life.<span class=\"_ _e\"></span> Subsequen<span class=\"_ _e\"></span>t expenditu<span class=\"_ _2\"></span>re Subsequent expenditure on capitalised intang<span class=\"_ _2\"></span>ible assets is capitalised only when it increases the future economic benefits embodied in the specific a<span class=\"_ _2\"></span>sset to which it relates. All other expenditure is recognised in profit or loss as it<span class=\"_ _e\"></span> is incurred. Amortisation Amortisation<span class=\"_ _2\"></span> is recognised in profit or loss on a straight-li<span class=\"_ _e\"></span>ne basis over the estimated useful life of intangible assets, unless the useful life is indefinite<span class=\"_ _2\"></span>. Goodwill and intangible assets with indefinite useful lives are tested systematically for impairment on e<span class=\"_ _e\"></span>ach end of the repor<span class=\"_ _2\"></span>ting period. Software is amortised from the date it b<span class=\"_ _e\"></span>ecomes available for use. The estimated useful lives are as follows: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Licence<span class=\"_ _2\"></span>s <span class=\"_ _13b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span>20.00%<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Concessio<span class=\"_ _2\"></span>ns <span class=\"_ _59\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span>contractual period </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Compu<span class=\"_ _2\"></span>ter software <span class=\"_ _13b\"> </span> <span class=\"_ _a7\"> </span> <span class=\"_ _121\"> </span> <span class=\"_ _a7\"> </span><span class=\"ls1d\">   </span>20.00 <span class=\"ff42\">\u2013</span> 25.00% </span></span>Depreciation me<span class=\"_ _2\"></span>thods, remaining useful lives and residual<span class=\"_ _e\"></span> values of <span class=\"_ _2\"></span>intangible assets are reassessed annually and are prospectively adjusted as the<span class=\"_ _2\"></span> occasion arises.<span class=\"_ _e\"></span> Derecognition An intangible<span class=\"_ _2\"></span> asset is derecognised upon disposal (i.e., the date <span class=\"_ _e\"></span>upon which the recipient obtains control of it) or wh<span class=\"_ _e\"></span>en no future econom<span class=\"_ _2\"></span>ic benefits are expected from its use or disposal. Any gain or loss arising upon derecognition of the asset (calculated as the differen<span class=\"_ _2\"></span>ce between the net disposal proceeds and the carrying amount of the asset) is included in the statement of profit or <span class=\"_ _e\"></span>loss.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIntangibleAssetsOtherThanGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__158": {
   "value": "3.3.3 <span class=\"_ _36\"> </span>Goodwill Goodwill is state<span class=\"_ _2\"></span>d at cost, less accumulated impairment l<span class=\"_ _e\"></span>osses. Goodwill is allocated to cash-generating units and is not amortised but is tested annua<span class=\"_ _2\"></span>lly for impairment (see Section <span class=\"_ _e\"></span>3.3.7 'Impairment of non-financial assets'). In the case of associates, the carrying amount of good<span class=\"_ _2\"></span>will is included in the carrying amount of the invest<span class=\"_ _e\"></span>ment in the a<span class=\"_ _2\"></span>ssociates.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__171-1": {
   "value": "3.3.4 <span class=\"_ _36\"> </span>Trade and other receivables Contract assets<span class=\"fc1b\"> </span>Revenue arising from<span class=\"_ _2\"></span> third party services (see Note 3.4.<span class=\"_ _e\"></span>1) and associated costs are recognised over time as we ha<span class=\"_ _e\"></span>ve the right to consideration for wor<span class=\"_ _2\"></span>k performed but not billed. Prog<span class=\"_ _e\"></span>ress is determ<span class=\"_ _2\"></span>ined based on the costs incurred.<span class=\"_ _e\"></span> The contract<span class=\"_ _2\"></span> assets primarily relate to the g<span class=\"ff42\">r<span class=\"_ _e\"></span>oup\u2019s rights to consideration for work completed<span class=\"_ _2\"></span> but not billed at the reporting dat<span class=\"ff3f\">e <span class=\"_ _e\"></span>on </span></span>project work. The con<span class=\"_ _2\"></span>tract assets are transferred to receiv<span class=\"_ _e\"></span>ables when<span class=\"_ _2\"></span> the rights become unconditional. This usually occurs wh<span class=\"_ _e\"></span>en the group<span class=\"_ _2\"></span> issues an invoice to the customer. Contract assets <span class=\"_ _e\"></span>are included in trade and other receivables. Levies In its role<span class=\"_ _2\"></span> as T<span class=\"ls27\">SO<span class=\"ff42 ls1c\">\u2019s</span></span>, Elia Transmission Belgium SA/NV and 50Hertz Transmission<span class=\"_ _2\"></span> GmbH are<span class=\"_ _e\"></span> subject to various public service obligation<span class=\"_ _2\"></span>s imposed by the<span class=\"ls1c\">ir</span> respective governments and/<span class=\"_ _e\"></span>or by regulation mechanisms. These identify public service obligations in various areas (such as promoting the u<span class=\"_ _2\"></span>se of <span class=\"_ _e\"></span>renewable energy, social sup<span class=\"_ _2\"></span>port, fees for the use of the public domain, offshore liabilities<span class=\"_ _e\"></span><span class=\"ls8f\">) </span>that should be<span class=\"_ _2\"></span> fulfilled by TSO<span class=\"ff42\">\u2019</span>s. The costs incurred by T<span class=\"_ _e\"></span>SOs as they undertake these obligations are fully covered by th<span class=\"ff42\">e tariff \u2018levies\u2019 </span>appro<span class=\"_ _2\"></span>ved by the regulators in Belgium and Germany. <span class=\"_ _e\"></span>The amounts outs<span class=\"_ _2\"></span>tanding (deficit<span class=\"_ _e\"></span>) are reported as a trade and other receivables.  Throughout this process<span class=\"ls1d\">, </span>as <span class=\"ff42\">the TSO\u2019s</span> are agents, the Group opted for a net presentation both at profit or loss and at balance sheet level. The<span class=\"_ _2\"></span>se transactions are fully <span class=\"ff42\">\u201cpassed through\u201d</span>.<span class=\"_ _e\"></span> See also N<span class=\"ls5b\">ot</span>e 9.1.<span class=\"ls5b\">4.</span> Trade and other receivables<span class=\"fc1b\"> </span>Trade rece<span class=\"_ _2\"></span>ivables and other receivables are measured at <span class=\"_ _e\"></span>amortised cost minus the appropriate allowance for amounts regarded as unreco<span class=\"_ _2\"></span>verable.<span class=\"_ _e\"></span> Impairment For trade<span class=\"_ _2\"></span> receivables and contract assets, the group a<span class=\"_ _e\"></span>pplies a simplified approach when calculating the Expected Credit Losses (ECLs). The impairment model is based on th<span class=\"_ _2\"></span>e expected credit lo<span class=\"_ _e\"></span>ss model. An individual approach is used for customer<span class=\"_ _2\"></span>s a<span class=\"_ _e\"></span>nd other counterpartie<span class=\"_ _2\"></span>s, for which the change in credit risk is monitored on an individual basis.<span class=\"_ _e\"></span> See N<span class=\"ls5b\">ot</span><span class=\"ff42\">e 8.1 \u2018Credit risk\u2019, for a detailed description of the model</span>.3.3.6 <span class=\"_ _36\"> </span>Cash and cash equivalents Cash and cash equivalen<span class=\"_ _2\"></span>ts comprise cash balances, bank balances, commercial paper and deposits that can be withdra<span class=\"_ _2\"></span>wn on deman<span class=\"_ _e\"></span>d. Overdrafts that ar<span class=\"_ _2\"></span>e repayable on demand for<span class=\"_ _e\"></span>m an integral part of the group's cash management <span class=\"ls5b\">and <span class=\"_ _e\"></span></span>are included as a component of cash and<span class=\"_ _2\"></span> cash equivalents for the purpose of the statement of cash flows.3.3.8 <span class=\"_ _148\"> </span>Financial assets Initial recognition and measurement The classifica<span class=\"_ _2\"></span>tion of financial assets at i<span class=\"_ _e\"></span>nitial recognition depends on their contractual cash flow characteristics and the g<span class=\"ff42\">roup\u2019s busines</span>s model for managing them. T<span class=\"_ _2\"></span>he group initially measures a <span class=\"_ _e\"></span>financial asset at its fair value plus transaction costs. Su<span class=\"_ _e\"></span>b<span class=\"_ _e\"></span>seq<span class=\"_ _e\"></span>u<span class=\"_ _e\"></span>en<span class=\"_ _e\"></span>t <span class=\"_ _e\"></span>m<span class=\"_ _e\"></span>e<span class=\"_ _e\"></span>asu<span class=\"_ _e\"></span>r<span class=\"_ _e\"></span>em<span class=\"_ _e\"></span>en<span class=\"_ _e\"></span>t<span class=\"ff3f\"> </span>For purpo<span class=\"_ _2\"></span>ses of subsequent measurement, financial assets are classified in three c<span class=\"_ _e\"></span>ategories: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Fina<span class=\"_ _2\"></span>ncial assets at amortised cost (debt instruments)<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Fina<span class=\"_ _2\"></span>ncial assets measured at fair value through OCI (equity instruments)<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Fina<span class=\"_ _2\"></span>ncial assets measured at fair value through profit and loss </span></span>Financial <span class=\"_ _e\"></span>assets at<span class=\"_ _2\"></span> amortised cost Financial a<span class=\"_ _2\"></span>ssets at amortised cost are managed wit<span class=\"_ _e\"></span>h a view to holding them to maturity and collecting<span class=\"_ _2\"></span> contractual cash flows. The financial asse<span class=\"_ _2\"></span>ts give rise to cash flows th<span class=\"_ _e\"></span>at are solely payments of principal and interest on the principal amount outstanding<span class=\"_ _2\"></span>.<span class=\"_ _e\"></span> Financial a<span class=\"_ _2\"></span>ssets at amortised cost are subsequently <span class=\"_ _e\"></span>measured using the Effective Interest Rate (EIR) method and are subject to impairm<span class=\"_ _2\"></span>ent. Gains and losses are recognised in profit or l<span class=\"_ _e\"></span>oss when the asset is derecogn<span class=\"_ _2\"></span>ised, modified or impaired.<span class=\"_ _e\"></span> The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s financial assets at amortised cost i<span class=\"ff3f\">nclude l<span class=\"_ _e\"></span>oans to third parties. </span></span>Financial <span class=\"_ _e\"></span>assets measured at fair value through OCI (equity instruments FVOCI) Upon initial recogn<span class=\"_ _2\"></span>ition, the group irrevocably classifies it<span class=\"_ _e\"></span>s equity inve<span class=\"_ _2\"></span>stments as equity instruments <span class=\"_ _e\"></span>measured at fair value through OCI when the<span class=\"_ _2\"></span> group does not have significant influence and th<span class=\"_ _e\"></span>e assets are not held for trading. <span class=\"ls7c\">Th<span class=\"ls1c\">is</span></span> cl<span class=\"_ _e\"></span>assification is determined on an instrument-<span class=\"ls5b\">by</span>-instrument basis. Gains and<span class=\"_ _2\"></span> losses on these financial assets are never recycl<span class=\"_ _e\"></span>ed to profit or loss. Dividends are recognised as other income in the statement of <span class=\"_ _2\"></span>profit or loss when the right of payment has been established, except when the g<span class=\"_ _e\"></span>roup benefits from such proceeds as a recover<span class=\"_ _2\"></span>y of part of the cost of the financial asset, in which<span class=\"_ _e\"></span> case <span class=\"ls5b\">any</span> such gains are recorded in OCI. Equity instruments me<span class=\"_ _e\"></span>asured at fair value through OCI are no<span class=\"_ _2\"></span>t subject to impairment assessment. <span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> has elected to irrevocably classify <span class=\"_ _e\"></span><span class=\"ls5b\">non</span>-listed equity investments over which the group does not have significant influence in this category.  Financial <span class=\"_ _e\"></span>assets mea<span class=\"_ _2\"></span>sured at fair value through profit and loss<span class=\"_ _e\"></span> (FVTPL) All financial assets not cla<span class=\"_ _2\"></span>ssified as measured at amortised cost or FVOCI as described above are measured at FVTPL<span class=\"_ _e\"></span> Impairmen<span class=\"_ _e\"></span>t of financ<span class=\"_ _2\"></span>ial assets<span class=\"ff3f\"> </span>The group<span class=\"_ _2\"></span> recognises an allowance for expected credit losses (ECLs) for its debt instruments.<span class=\"_ _e\"></span> See Note 8.1 <span class=\"ff42\">\u2018</span>Credit risk<span class=\"ff42 ls1c\">\u2019,</span> for a detailed description of the ap<span class=\"_ _2\"></span>proach3.3.9 <span class=\"_ _36\"> </span>Derivative financial instruments and hedg<span class=\"_ _e\"></span>e accounting Deri<span class=\"_ _e\"></span>vative financia<span class=\"_ _2\"></span>l instruments The group<span class=\"_ _2\"></span> sometimes uses derivative financial instruments to hedge its exposure to foreign exchange, interest rat<span class=\"_ _e\"></span>e and commodity prices risks arising from oper<span class=\"_ _2\"></span>ating, financing and investment activities. In accordance with its treasury policy, the gr<span class=\"_ _e\"></span>oup neither holds nor issues der<span class=\"_ _2\"></span>ivative financial instruments for trading purposes. However, derivatives that do not qualify for hedge accounti<span class=\"_ _e\"></span>ng are accounted for as in<span class=\"_ _2\"></span>struments held for trading purposes.<span class=\"_ _e\"></span> Derivative fin<span class=\"_ _2\"></span>ancial instruments are initially rec<span class=\"_ _e\"></span>ognised at fair value. Any gain or loss resulting from changes in the fair valu<span class=\"_ _2\"></span>e is immediately boo<span class=\"_ _2\"></span>ked in the statement of profit or loss. Wh<span class=\"_ _e\"></span>ere derivative financial instruments qualify for<span class=\"_ _2\"></span> hedge accounting, the reflection of any resulting<span class=\"_ _2\"></span> gain or loss depends on the nature of the <span class=\"_ _e\"></span>item being hedged. The fa<span class=\"_ _2\"></span>ir value of interest <span class=\"_ _e\"></span>rate swaps is the estimated amount that the group would receive or pay to terminate the swap at the end of the repor<span class=\"_ _2\"></span>ting period, taking into account the current interest rates and the current creditworthiness of t<span class=\"_ _e\"></span>he swap counterparties and the group<span class=\"_ _2\"></span>. The fair value of forward exchange contracts is the<span class=\"_ _e\"></span>ir quoted market price at the end of the reporting period, i.e. the present value of the quoted for<span class=\"_ _2\"></span>ward price.<span class=\"_ _e\"></span> Deri<span class=\"_ _e\"></span>vatives used as <span class=\"_ _2\"></span>hedging instruments Cash flow hedges Changes in<span class=\"_ _2\"></span> the fair value of the derivative hedging instrument designated as a cash-flow hedge a<span class=\"_ _e\"></span>re recognised directly in OCI to the extent that the hedge is e<span class=\"_ _2\"></span>ffective. If the hedge is ineffective, changes in fair value are recognised in profit or loss.<span class=\"_ _e\"></span> Th<span class=\"ls0\">e group uses forward currency contracts as hedges of its exposure to foreign currency risk in forecast transactions and firm </span>commitments, a<span class=\"_ _2\"></span>s well as forward commodity contracts for its exposure to volatility in the commodity prices. <span class=\"_ _e\"></span>The group designates only the spot element of <span class=\"_ _2\"></span>forward contracts as a hedged risk. The forward element is considered the cost of hedging and is<span class=\"_ _e\"></span> recognised in OCI and accumulated in a<span class=\"_ _2\"></span> separate component of the stateme<span class=\"_ _e\"></span>nt of financial position under hedging reserves. If the hedging instrumen<span class=\"_ _2\"></span>t no longer meets the criteria for hedge accounting, expires or is sold, terminated or exercised, hedge accounting is pro<span class=\"_ _2\"></span>spectively discontinued. The cumulative gain or loss previously recognised in OCI remains there until the fo<span class=\"_ _e\"></span>recast transact<span class=\"_ _2\"></span>ion occurs. When the hedged item is a non-fina<span class=\"_ _e\"></span>ncial asset, the amount recognised in OCI is transferred, where justified, to the carrying<span class=\"_ _2\"></span> amount of the asset. In other cases, the amount <span class=\"_ _e\"></span>recogn<span class=\"_ _2\"></span>ised in OCI is transferred to profit or loss in the same peri<span class=\"_ _e\"></span>od that the hedged item affects <span class=\"_ _2\"></span>profit or loss.<span class=\"_ _e\"></span> When a derivative or h<span class=\"_ _2\"></span>edge relationship is terminated, cumulative gains or losses still remain in OCI, provided that <span class=\"_ _e\"></span>the hedged transact<span class=\"_ _2\"></span>ion is still expected to occur. If the hedged transaction is no longer expected to take place, the cumulative unrealised gain or loss is remo<span class=\"_ _2\"></span>ved from OCI and is immediately recognised in profit or loss. The group<span class=\"_ _2\"></span> recognises derivatives to hedge the price for the future procurement of the physical requirement for grid losses t<span class=\"_ _e\"></span>hat is expected<span class=\"_ _2\"></span> in subsequent periods and is covered in each case by short-term procurement transactions on the spot <span class=\"_ _e\"></span>market.<span class=\"_ _2\"></span> These derivatives are measured at fair<span class=\"_ _2\"></span> value in OCI with no effect on profit or loss as part of cash flow hedge accounting; they se<span class=\"_ _e\"></span>rve as price hedging<span class=\"_ _2\"></span> of the physical demand for electrical energy to cover grid losses (underlying transaction). Due to the availability a<span class=\"_ _e\"></span>nd liquidity of future<span class=\"_ _2\"></span>s trading, the hedging period for intended price hedging covers a period of up to two years from the balance <span class=\"_ _e\"></span>sheet date. In this context, the group<span class=\"_ _2\"></span> pursues a conservative hedging strategy oriented towards the regulatory framework and the ability to roll over the electricity procur<span class=\"_ _2\"></span>ement costs incurred, which enables timely and predictable price hedgin<span class=\"_ _e\"></span>g.  The cr<span class=\"_ _2\"></span>itical term match method measures effectiveness. If the valuation-<span class=\"_ _e\"></span>relevant parameters of the hedged item and hedging instrument match, it <span class=\"_ _2\"></span>is assumed that an effective hedging relationship exists and that changes in value from both items <span class=\"_ _e\"></span>offset each other. The group strives for<span class=\"_ _2\"></span> full price hedging of the expected volume of grid loss energy (hedge ratio 1:1).<span class=\"_ _20\"></span> Hedging o<span class=\"_ _2\"></span>f monetary assets and liabilities<span class=\"_ _e\"></span> Hedge accounting is not applied<span class=\"_ _2\"></span> to derivative instruments that economically hedge monetary assets and liabilities denominated<span class=\"_ _e\"></span> in foreign<span class=\"_ _2\"></span> currencies. Changes in the fair value of such deriv<span class=\"_ _e\"></span>atives are recognised in profit or lo<span class=\"_ _2\"></span>ss <span class=\"_ _e\"></span><span class=\"ls5b\">as</span> fo<span class=\"_ _e\"></span>reign currency gains and losses.3.3.11 <span class=\"_ _1dd\"> </span>Financial <span class=\"_ _e\"></span>liabilities Financial lia<span class=\"_ _2\"></span>bilities consist of interest-b<span class=\"_ _e\"></span>earing loans and borro<span class=\"_ _2\"></span>wings in the group. They are initially r<span class=\"_ _e\"></span>ecognised at fair value, less related transact<span class=\"_ _2\"></span>ion costs. Subsequent to initial recognition, interest<span class=\"_ _e\"></span>-bearing loans and borrowings are stated at amortised c<span class=\"_ _e\"></span>ost price with any differen<span class=\"_ _2\"></span>ce between amount at initial recognition a<span class=\"_ _e\"></span>nd redemption value being recognised in profit or loss over the period of the loans on an effe<span class=\"_ _2\"></span>ctive interest basis. A financial liability is d<span class=\"_ _2\"></span>erecognised when the obligati<span class=\"_ _e\"></span>on under the liability is disch<span class=\"_ _2\"></span>arged or cancelled or expires. When an existing financial liability is replace<span class=\"_ _2\"></span>d by another from the same lender on substantially different terms, or the terms of an existing<span class=\"_ _e\"></span> liability are substantia<span class=\"_ _2\"></span>lly modified, such an exchange or modification i<span class=\"_ _e\"></span>s treated as the derecognition of the original liability and the recognition of a new liability. T<span class=\"_ _2\"></span>he difference in the respective carrying amounts is recognised in th<span class=\"_ _e\"></span>e statement of profit or loss. Financial a<span class=\"_ _2\"></span>ssets and financial liabilities are offset and the net amount is reported in the consolidated statement of financial position if there is a currently enfor<span class=\"_ _2\"></span>ceable legal right to offset the rec<span class=\"_ _e\"></span>ognised amounts and there is an inten<span class=\"_ _2\"></span>tion to settle on a net ba<span class=\"_ _e\"></span>sis, to realise the assets<span class=\"_ _2\"></span> and settle the liabilities simultaneously.3.3.14 <span class=\"_ _1dd\"> </span>Trade and other payables Trade and<span class=\"_ _2\"></span> other payables are stated at amortised cost.<span class=\"_ _e\"></span> Levies<span class=\"fc1b\"> </span>In its role<span class=\"_ _2\"></span> as a TSO, Elia Transmission Belgium SA/NV an<span class=\"_ _e\"></span>d 50Hertz Transmission<span class=\"_ _2\"></span> GmbH are<span class=\"_ _e\"></span> subject to various public service obligation<span class=\"_ _2\"></span>s imposed by the Government and/or by regulation<span class=\"_ _e\"></span> mechanisms. These identify public service obligations in various fields (such as promoting the u<span class=\"_ _2\"></span>se of renewable energy, social s<span class=\"_ _e\"></span>upport, fees for the use of the <span class=\"ls5b\">pu</span>blic domain, offshore liab<span class=\"_ _e\"></span>ility) for fulfilment by TSOs. The<span class=\"_ _2\"></span> costs incurred by TSOs in accordance with th<span class=\"_ _e\"></span>ese obligations are fully co<span class=\"_ _2\"></span>vered by the tariff <span class=\"_ _e\"></span><span class=\"ff42\">\u2018</span>levies<span class=\"ff42\">\u2019</span> approved by the regulator. The amoun<span class=\"_ _2\"></span>ts outstanding (surplus) are reported as a tr<span class=\"_ _e\"></span>ade and other payable.  In this process<span class=\"ls1d\">, </span>as <span class=\"ff42\">the TSO\u2019s </span>are <span class=\"ls5b\">agent</span>s<span class=\"_ _e\"></span>, the group opted for a net presentation both at profit or loss and at ba<span class=\"_ _2\"></span>lanc<span class=\"_ _e\"></span>e sheet level.  These transact<span class=\"_ _2\"></span>ions are fully \u201cpassed through\u201d.<span class=\"ff3f\"> </span>See also Note<span class=\"_ _2\"></span> 9.1.14.Hybrid securitiesHybrid securities are de<span class=\"_ _2\"></span>eply subordinated securities. With the exception of ordinary shares, hybrid securities rank as the mos<span class=\"_ _e\"></span>t junior instruments in t<span class=\"_ _2\"></span>he capital structure of the gro<span class=\"_ _e\"></span>up in an insolvency hierarchy. Hybrid securities are perpe<span class=\"_ _2\"></span>tual instruments<span class=\"_ _e\"></span> and do not default on non-payment of coupons (unless <span class=\"_ _2\"></span>such payment was mandatory following a resolution or payment of a dividend to ordinary shareholder<span class=\"_ _2\"></span>s).<span class=\"_ _e\"></span> The holder<span class=\"_ _2\"></span>s of hybrid securities have limited influence <span class=\"ls5b\">on <span class=\"_ _e\"></span></span>the outcome of a bankruptcy proceeding or restructuring outside bankruptcy. Consequently, the holders cannot oblige the group to pay distributions or redeem the securities in part or in f<span class=\"_ _2\"></span>ull. Payment of distributions on and<span class=\"_ _2\"></span> redemption of the securities is at our sole discretion.<span class=\"_ _e\"></span> In light of their characteristics, hybrid securities are classified as an equity instrument under IFRS. T<span class=\"_ _2\"></span>he associated issue costs are recognised directly in retained earnings.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__163-1": {
   "value": "3.3.4 <span class=\"_ _36\"> </span>Trade and other receivables Contract assets<span class=\"fc1b\"> </span>Revenue arising from<span class=\"_ _2\"></span> third party services (see Note 3.4.<span class=\"_ _e\"></span>1) and associated costs are recognised over time as we ha<span class=\"_ _e\"></span>ve the right to consideration for wor<span class=\"_ _2\"></span>k performed but not billed. Prog<span class=\"_ _e\"></span>ress is determ<span class=\"_ _2\"></span>ined based on the costs incurred.<span class=\"_ _e\"></span> The contract<span class=\"_ _2\"></span> assets primarily relate to the g<span class=\"ff42\">r<span class=\"_ _e\"></span>oup\u2019s rights to consideration for work completed<span class=\"_ _2\"></span> but not billed at the reporting dat<span class=\"ff3f\">e <span class=\"_ _e\"></span>on </span></span>project work. The con<span class=\"_ _2\"></span>tract assets are transferred to receiv<span class=\"_ _e\"></span>ables when<span class=\"_ _2\"></span> the rights become unconditional. This usually occurs wh<span class=\"_ _e\"></span>en the group<span class=\"_ _2\"></span> issues an invoice to the customer. Contract assets <span class=\"_ _e\"></span>are included in trade and other receivables. Levies In its role<span class=\"_ _2\"></span> as T<span class=\"ls27\">SO<span class=\"ff42 ls1c\">\u2019s</span></span>, Elia Transmission Belgium SA/NV and 50Hertz Transmission<span class=\"_ _2\"></span> GmbH are<span class=\"_ _e\"></span> subject to various public service obligation<span class=\"_ _2\"></span>s imposed by the<span class=\"ls1c\">ir</span> respective governments and/<span class=\"_ _e\"></span>or by regulation mechanisms. These identify public service obligations in various areas (such as promoting the u<span class=\"_ _2\"></span>se of <span class=\"_ _e\"></span>renewable energy, social sup<span class=\"_ _2\"></span>port, fees for the use of the public domain, offshore liabilities<span class=\"_ _e\"></span><span class=\"ls8f\">) </span>that should be<span class=\"_ _2\"></span> fulfilled by TSO<span class=\"ff42\">\u2019</span>s. The costs incurred by T<span class=\"_ _e\"></span>SOs as they undertake these obligations are fully covered by th<span class=\"ff42\">e tariff \u2018levies\u2019 </span>appro<span class=\"_ _2\"></span>ved by the regulators in Belgium and Germany. <span class=\"_ _e\"></span>The amounts outs<span class=\"_ _2\"></span>tanding (deficit<span class=\"_ _e\"></span>) are reported as a trade and other receivables.  Throughout this process<span class=\"ls1d\">, </span>as <span class=\"ff42\">the TSO\u2019s</span> are agents, the Group opted for a net presentation both at profit or loss and at balance sheet level. The<span class=\"_ _2\"></span>se transactions are fully <span class=\"ff42\">\u201cpassed through\u201d</span>.<span class=\"_ _e\"></span> See also N<span class=\"ls5b\">ot</span>e 9.1.<span class=\"ls5b\">4.</span> Trade and other receivables<span class=\"fc1b\"> </span>Trade rece<span class=\"_ _2\"></span>ivables and other receivables are measured at <span class=\"_ _e\"></span>amortised cost minus the appropriate allowance for amounts regarded as unreco<span class=\"_ _2\"></span>verable.<span class=\"_ _e\"></span> Impairment For trade<span class=\"_ _2\"></span> receivables and contract assets, the group a<span class=\"_ _e\"></span>pplies a simplified approach when calculating the Expected Credit Losses (ECLs). The impairment model is based on th<span class=\"_ _2\"></span>e expected credit lo<span class=\"_ _e\"></span>ss model. An individual approach is used for customer<span class=\"_ _2\"></span>s a<span class=\"_ _e\"></span>nd other counterpartie<span class=\"_ _2\"></span>s, for which the change in credit risk is monitored on an individual basis.<span class=\"_ _e\"></span> See N<span class=\"ls5b\">ot</span><span class=\"ff42\">e 8.1 \u2018Credit risk\u2019, for a detailed description of the model</span>.3.3.6 <span class=\"_ _36\"> </span>Cash and cash equivalents Cash and cash equivalen<span class=\"_ _2\"></span>ts comprise cash balances, bank balances, commercial paper and deposits that can be withdra<span class=\"_ _2\"></span>wn on deman<span class=\"_ _e\"></span>d. Overdrafts that ar<span class=\"_ _2\"></span>e repayable on demand for<span class=\"_ _e\"></span>m an integral part of the group's cash management <span class=\"ls5b\">and <span class=\"_ _e\"></span></span>are included as a component of cash and<span class=\"_ _2\"></span> cash equivalents for the purpose of the statement of cash flows.3.3.8 <span class=\"_ _148\"> </span>Financial assets Initial recognition and measurement The classifica<span class=\"_ _2\"></span>tion of financial assets at i<span class=\"_ _e\"></span>nitial recognition depends on their contractual cash flow characteristics and the g<span class=\"ff42\">roup\u2019s busines</span>s model for managing them. T<span class=\"_ _2\"></span>he group initially measures a <span class=\"_ _e\"></span>financial asset at its fair value plus transaction costs. Su<span class=\"_ _e\"></span>b<span class=\"_ _e\"></span>seq<span class=\"_ _e\"></span>u<span class=\"_ _e\"></span>en<span class=\"_ _e\"></span>t <span class=\"_ _e\"></span>m<span class=\"_ _e\"></span>e<span class=\"_ _e\"></span>asu<span class=\"_ _e\"></span>r<span class=\"_ _e\"></span>em<span class=\"_ _e\"></span>en<span class=\"_ _e\"></span>t<span class=\"ff3f\"> </span>For purpo<span class=\"_ _2\"></span>ses of subsequent measurement, financial assets are classified in three c<span class=\"_ _e\"></span>ategories: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Fina<span class=\"_ _2\"></span>ncial assets at amortised cost (debt instruments)<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Fina<span class=\"_ _2\"></span>ncial assets measured at fair value through OCI (equity instruments)<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Fina<span class=\"_ _2\"></span>ncial assets measured at fair value through profit and loss </span></span>Financial <span class=\"_ _e\"></span>assets at<span class=\"_ _2\"></span> amortised cost Financial a<span class=\"_ _2\"></span>ssets at amortised cost are managed wit<span class=\"_ _e\"></span>h a view to holding them to maturity and collecting<span class=\"_ _2\"></span> contractual cash flows. The financial asse<span class=\"_ _2\"></span>ts give rise to cash flows th<span class=\"_ _e\"></span>at are solely payments of principal and interest on the principal amount outstanding<span class=\"_ _2\"></span>.<span class=\"_ _e\"></span> Financial a<span class=\"_ _2\"></span>ssets at amortised cost are subsequently <span class=\"_ _e\"></span>measured using the Effective Interest Rate (EIR) method and are subject to impairm<span class=\"_ _2\"></span>ent. Gains and losses are recognised in profit or l<span class=\"_ _e\"></span>oss when the asset is derecogn<span class=\"_ _2\"></span>ised, modified or impaired.<span class=\"_ _e\"></span> The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s financial assets at amortised cost i<span class=\"ff3f\">nclude l<span class=\"_ _e\"></span>oans to third parties. </span></span>Financial <span class=\"_ _e\"></span>assets measured at fair value through OCI (equity instruments FVOCI) Upon initial recogn<span class=\"_ _2\"></span>ition, the group irrevocably classifies it<span class=\"_ _e\"></span>s equity inve<span class=\"_ _2\"></span>stments as equity instruments <span class=\"_ _e\"></span>measured at fair value through OCI when the<span class=\"_ _2\"></span> group does not have significant influence and th<span class=\"_ _e\"></span>e assets are not held for trading. <span class=\"ls7c\">Th<span class=\"ls1c\">is</span></span> cl<span class=\"_ _e\"></span>assification is determined on an instrument-<span class=\"ls5b\">by</span>-instrument basis. Gains and<span class=\"_ _2\"></span> losses on these financial assets are never recycl<span class=\"_ _e\"></span>ed to profit or loss. Dividends are recognised as other income in the statement of <span class=\"_ _2\"></span>profit or loss when the right of payment has been established, except when the g<span class=\"_ _e\"></span>roup benefits from such proceeds as a recover<span class=\"_ _2\"></span>y of part of the cost of the financial asset, in which<span class=\"_ _e\"></span> case <span class=\"ls5b\">any</span> such gains are recorded in OCI. Equity instruments me<span class=\"_ _e\"></span>asured at fair value through OCI are no<span class=\"_ _2\"></span>t subject to impairment assessment. <span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> has elected to irrevocably classify <span class=\"_ _e\"></span><span class=\"ls5b\">non</span>-listed equity investments over which the group does not have significant influence in this category.  Financial <span class=\"_ _e\"></span>assets mea<span class=\"_ _2\"></span>sured at fair value through profit and loss<span class=\"_ _e\"></span> (FVTPL) All financial assets not cla<span class=\"_ _2\"></span>ssified as measured at amortised cost or FVOCI as described above are measured at FVTPL<span class=\"_ _e\"></span> Impairmen<span class=\"_ _e\"></span>t of financ<span class=\"_ _2\"></span>ial assets<span class=\"ff3f\"> </span>The group<span class=\"_ _2\"></span> recognises an allowance for expected credit losses (ECLs) for its debt instruments.<span class=\"_ _e\"></span> See Note 8.1 <span class=\"ff42\">\u2018</span>Credit risk<span class=\"ff42 ls1c\">\u2019,</span> for a detailed description of the ap<span class=\"_ _2\"></span>proach",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinancialAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__159": {
   "value": "3.3.4 <span class=\"_ _36\"> </span>Trade and other receivables Contract assets<span class=\"fc1b\"> </span>Revenue arising from<span class=\"_ _2\"></span> third party services (see Note 3.4.<span class=\"_ _e\"></span>1) and associated costs are recognised over time as we ha<span class=\"_ _e\"></span>ve the right to consideration for wor<span class=\"_ _2\"></span>k performed but not billed. Prog<span class=\"_ _e\"></span>ress is determ<span class=\"_ _2\"></span>ined based on the costs incurred.<span class=\"_ _e\"></span> The contract<span class=\"_ _2\"></span> assets primarily relate to the g<span class=\"ff42\">r<span class=\"_ _e\"></span>oup\u2019s rights to consideration for work completed<span class=\"_ _2\"></span> but not billed at the reporting dat<span class=\"ff3f\">e <span class=\"_ _e\"></span>on </span></span>project work. The con<span class=\"_ _2\"></span>tract assets are transferred to receiv<span class=\"_ _e\"></span>ables when<span class=\"_ _2\"></span> the rights become unconditional. This usually occurs wh<span class=\"_ _e\"></span>en the group<span class=\"_ _2\"></span> issues an invoice to the customer. Contract assets <span class=\"_ _e\"></span>are included in trade and other receivables. Levies In its role<span class=\"_ _2\"></span> as T<span class=\"ls27\">SO<span class=\"ff42 ls1c\">\u2019s</span></span>, Elia Transmission Belgium SA/NV and 50Hertz Transmission<span class=\"_ _2\"></span> GmbH are<span class=\"_ _e\"></span> subject to various public service obligation<span class=\"_ _2\"></span>s imposed by the<span class=\"ls1c\">ir</span> respective governments and/<span class=\"_ _e\"></span>or by regulation mechanisms. These identify public service obligations in various areas (such as promoting the u<span class=\"_ _2\"></span>se of <span class=\"_ _e\"></span>renewable energy, social sup<span class=\"_ _2\"></span>port, fees for the use of the public domain, offshore liabilities<span class=\"_ _e\"></span><span class=\"ls8f\">) </span>that should be<span class=\"_ _2\"></span> fulfilled by TSO<span class=\"ff42\">\u2019</span>s. The costs incurred by T<span class=\"_ _e\"></span>SOs as they undertake these obligations are fully covered by th<span class=\"ff42\">e tariff \u2018levies\u2019 </span>appro<span class=\"_ _2\"></span>ved by the regulators in Belgium and Germany. <span class=\"_ _e\"></span>The amounts outs<span class=\"_ _2\"></span>tanding (deficit<span class=\"_ _e\"></span>) are reported as a trade and other receivables.  Throughout this process<span class=\"ls1d\">, </span>as <span class=\"ff42\">the TSO\u2019s</span> are agents, the Group opted for a net presentation both at profit or loss and at balance sheet level. The<span class=\"_ _2\"></span>se transactions are fully <span class=\"ff42\">\u201cpassed through\u201d</span>.<span class=\"_ _e\"></span> See also N<span class=\"ls5b\">ot</span>e 9.1.<span class=\"ls5b\">4.</span> Trade and other receivables<span class=\"fc1b\"> </span>Trade rece<span class=\"_ _2\"></span>ivables and other receivables are measured at <span class=\"_ _e\"></span>amortised cost minus the appropriate allowance for amounts regarded as unreco<span class=\"_ _2\"></span>verable.<span class=\"_ _e\"></span> Impairment For trade<span class=\"_ _2\"></span> receivables and contract assets, the group a<span class=\"_ _e\"></span>pplies a simplified approach when calculating the Expected Credit Losses (ECLs). The impairment model is based on th<span class=\"_ _2\"></span>e expected credit lo<span class=\"_ _e\"></span>ss model. An individual approach is used for customer<span class=\"_ _2\"></span>s a<span class=\"_ _e\"></span>nd other counterpartie<span class=\"_ _2\"></span>s, for which the change in credit risk is monitored on an individual basis.<span class=\"_ _e\"></span> See N<span class=\"ls5b\">ot</span><span class=\"ff42\">e 8.1 \u2018Credit risk\u2019, for a detailed description of the model</span>.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForTradeAndOtherReceivablesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__160-1": {
   "value": "Impairment For trade<span class=\"_ _2\"></span> receivables and contract assets, the group a<span class=\"_ _e\"></span>pplies a simplified approach when calculating the Expected Credit Losses (ECLs). The impairment model is based on th<span class=\"_ _2\"></span>e expected credit lo<span class=\"_ _e\"></span>ss model. An individual approach is used for customer<span class=\"_ _2\"></span>s a<span class=\"_ _e\"></span>nd other counterpartie<span class=\"_ _2\"></span>s, for which the change in credit risk is monitored on an individual basis.<span class=\"_ _e\"></span> See N<span class=\"ls5b\">ot</span><span class=\"ff42\">e 8.1 \u2018Credit risk\u2019, for a detailed description of the model</span>.Impairmen<span class=\"_ _e\"></span>t of financ<span class=\"_ _2\"></span>ial assets<span class=\"ff3f\"> </span>The group<span class=\"_ _2\"></span> recognises an allowance for expected credit losses (ECLs) for its debt instruments.<span class=\"_ _e\"></span> See Note 8.1 <span class=\"ff42\">\u2018</span>Credit risk<span class=\"ff42 ls1c\">\u2019,</span> for a detailed description of the ap<span class=\"_ _2\"></span>proach3.3.7 <span class=\"_ _36\"> </span>Impairment of non-fin<span class=\"_ _e\"></span>ancial assets The carrying<span class=\"_ _2\"></span> amount of the group's assets, excluding inve<span class=\"_ _e\"></span>ntories and deferred taxes, <span class=\"ls1c\">is</span> reviewed at the end of the reporting period for each asse<span class=\"_ _2\"></span>t to determine whether there is any indication of impairment. If any such indication exists, the recoverable amount <span class=\"_ _e\"></span>of the asset is estimated. The recoverable amou<span class=\"_ _2\"></span>nt of goodwill and intangible assets wi<span class=\"_ _e\"></span>th an indefinite u<span class=\"_ _2\"></span>seful life and intangible assets that are not yet<span class=\"_ _e\"></span> available for use is estimated a<span class=\"_ _2\"></span>t the end of each reporting period.<span class=\"_ _e\"></span> An impairment loss <span class=\"_ _2\"></span>is recognised whenever the carrying amount <span class=\"_ _e\"></span>of such <span class=\"ls5b\">an </span>asset o<span class=\"_ _e\"></span>r its cash-generating unit exceeds its recoverable amoun<span class=\"_ _2\"></span>t. Impairment losses are recognised in profit or loss. Recognised impairment losses relating to cash<span class=\"_ _e\"></span>-generating units are allocated f<span class=\"_ _2\"></span>irst to reduce the carrying amount of any goodwil<span class=\"_ _e\"></span>l allocated to cash-generating units and then to redu<span class=\"_ _2\"></span>ce <span class=\"_ _e\"></span>the carrying amount of the other<span class=\"_ _2\"></span> assets in the units on a pro-rata basis.<span class=\"_ _e\"></span> After recognition<span class=\"_ _2\"></span> of impairment losses, the depreciation costs for the asset will be p<span class=\"_ _e\"></span>rospectively adjusted. Calculation of the r<span class=\"_ _e\"></span>ecoverable amo<span class=\"_ _2\"></span>unt The recoverable amou<span class=\"_ _2\"></span>nt of intangible assets and property, plant and equipment is determined as the higher of their fair value l<span class=\"_ _e\"></span>ess costs of disposa<span class=\"_ _2\"></span>l <span class=\"ls5b\">and <span class=\"_ _e\"></span></span>their value in use. In assessing value in u<span class=\"_ _e\"></span>se, the e<span class=\"_ _2\"></span>xpected future cash flows are discounted to their <span class=\"_ _e\"></span>presen<span class=\"_ _2\"></span>t value using a pre-tax discount rate t<span class=\"_ _2\"></span>hat reflects both the current market assessment of the time value of money and the risks specific to the asset.<span class=\"_ _e\"></span> Th<span class=\"ls0\">e group's assets do not generate cash flows that are independent from other assets. The recoverable amount is therefore determined<span class=\"_ _2\"></span> </span>for the cash-generating<span class=\"_ _2\"></span> unit (i.e. the entire high<span class=\"_ _e\"></span>-voltage grid) to which the a<span class=\"_ _2\"></span>sset belongs. This is also the level at wh<span class=\"_ _e\"></span>ich the group administers its go<span class=\"_ _2\"></span>odwill and gathers the economic be<span class=\"_ _e\"></span>nefits of acquired goodwill. Reversal<span class=\"_ _e\"></span>s of impai<span class=\"_ _2\"></span>rment An impairment loss with respect <span class=\"ls1d\">to</span> goodwill is not reversed. Impairment loss on<span class=\"_ _2\"></span> other assets is reversed if there have been changes in the estimates u<span class=\"_ _2\"></span>sed to determine the recoverable amount.<span class=\"_ _e\"></span> An impairment loss <span class=\"_ _2\"></span>is reversed only to the extent that the asset's carrying amount does not exceed the carrying am<span class=\"_ _e\"></span>ount that would have been determined<span class=\"_ _2\"></span>, net of depreciation or amortisation, if no <span class=\"_ _e\"></span>impairment loss had been recognised.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForImpairmentOfAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__161": {
   "value": "3.3.5 <span class=\"_ _36\"> </span>Inventories Inventories (spare parts) ar<span class=\"_ _2\"></span>e stated at the lower of cost and net realisable value. Net realisable value is the estimated sel<span class=\"_ _e\"></span>ling price min<span class=\"_ _e\"></span>us the estimated c<span class=\"_ _2\"></span>osts of completion and selling expenses. <span class=\"_ _e\"></span>The cost of inventor<span class=\"_ _2\"></span>ies is based on the weighted<span class=\"_ _e\"></span>-average<span class=\"_ _e\"></span>-cost-price me<span class=\"_ _2\"></span>thod. The co<span class=\"_ _2\"></span>st includes the expenditure incurred in acquiring the inventories and the direct costs of <span class=\"_ _e\"></span>bringing them to their location and making them opera<span class=\"_ _2\"></span>tional.<span class=\"_ _e\"></span> Write-down<span class=\"_ _2\"></span>s of inventories to net realisable value are recognised in the period i<span class=\"_ _e\"></span>n which the write-offs occurred.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForMeasuringInventories",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__162": {
   "value": "3.3.6 <span class=\"_ _36\"> </span>Cash and cash equivalents Cash and cash equivalen<span class=\"_ _2\"></span>ts comprise cash balances, bank balances, commercial paper and deposits that can be withdra<span class=\"_ _2\"></span>wn on deman<span class=\"_ _e\"></span>d. Overdrafts that ar<span class=\"_ _2\"></span>e repayable on demand for<span class=\"_ _e\"></span>m an integral part of the group's cash management <span class=\"ls5b\">and <span class=\"_ _e\"></span></span>are included as a component of cash and<span class=\"_ _2\"></span> cash equivalents for the purpose of the statement of cash flows.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyToDetermineComponentsOfCashAndCashEquivalents",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__167": {
   "value": "3.3.7 <span class=\"_ _36\"> </span>Impairment of non-fin<span class=\"_ _e\"></span>ancial assets The carrying<span class=\"_ _2\"></span> amount of the group's assets, excluding inve<span class=\"_ _e\"></span>ntories and deferred taxes, <span class=\"ls1c\">is</span> reviewed at the end of the reporting period for each asse<span class=\"_ _2\"></span>t to determine whether there is any indication of impairment. If any such indication exists, the recoverable amount <span class=\"_ _e\"></span>of the asset is estimated. The recoverable amou<span class=\"_ _2\"></span>nt of goodwill and intangible assets wi<span class=\"_ _e\"></span>th an indefinite u<span class=\"_ _2\"></span>seful life and intangible assets that are not yet<span class=\"_ _e\"></span> available for use is estimated a<span class=\"_ _2\"></span>t the end of each reporting period.<span class=\"_ _e\"></span> An impairment loss <span class=\"_ _2\"></span>is recognised whenever the carrying amount <span class=\"_ _e\"></span>of such <span class=\"ls5b\">an </span>asset o<span class=\"_ _e\"></span>r its cash-generating unit exceeds its recoverable amoun<span class=\"_ _2\"></span>t. Impairment losses are recognised in profit or loss. Recognised impairment losses relating to cash<span class=\"_ _e\"></span>-generating units are allocated f<span class=\"_ _2\"></span>irst to reduce the carrying amount of any goodwil<span class=\"_ _e\"></span>l allocated to cash-generating units and then to redu<span class=\"_ _2\"></span>ce <span class=\"_ _e\"></span>the carrying amount of the other<span class=\"_ _2\"></span> assets in the units on a pro-rata basis.<span class=\"_ _e\"></span> After recognition<span class=\"_ _2\"></span> of impairment losses, the depreciation costs for the asset will be p<span class=\"_ _e\"></span>rospectively adjusted. Calculation of the r<span class=\"_ _e\"></span>ecoverable amo<span class=\"_ _2\"></span>unt The recoverable amou<span class=\"_ _2\"></span>nt of intangible assets and property, plant and equipment is determined as the higher of their fair value l<span class=\"_ _e\"></span>ess costs of disposa<span class=\"_ _2\"></span>l <span class=\"ls5b\">and <span class=\"_ _e\"></span></span>their value in use. In assessing value in u<span class=\"_ _e\"></span>se, the e<span class=\"_ _2\"></span>xpected future cash flows are discounted to their <span class=\"_ _e\"></span>presen<span class=\"_ _2\"></span>t value using a pre-tax discount rate t<span class=\"_ _2\"></span>hat reflects both the current market assessment of the time value of money and the risks specific to the asset.<span class=\"_ _e\"></span> Th<span class=\"ls0\">e group's assets do not generate cash flows that are independent from other assets. The recoverable amount is therefore determined<span class=\"_ _2\"></span> </span>for the cash-generating<span class=\"_ _2\"></span> unit (i.e. the entire high<span class=\"_ _e\"></span>-voltage grid) to which the a<span class=\"_ _2\"></span>sset belongs. This is also the level at wh<span class=\"_ _e\"></span>ich the group administers its go<span class=\"_ _2\"></span>odwill and gathers the economic be<span class=\"_ _e\"></span>nefits of acquired goodwill. Reversal<span class=\"_ _e\"></span>s of impai<span class=\"_ _2\"></span>rment An impairment loss with respect <span class=\"ls1d\">to</span> goodwill is not reversed. Impairment loss on<span class=\"_ _2\"></span> other assets is reversed if there have been changes in the estimates u<span class=\"_ _2\"></span>sed to determine the recoverable amount.<span class=\"_ _e\"></span> An impairment loss <span class=\"_ _2\"></span>is reversed only to the extent that the asset's carrying amount does not exceed the carrying am<span class=\"_ _e\"></span>ount that would have been determined<span class=\"_ _2\"></span>, net of depreciation or amortisation, if no <span class=\"_ _e\"></span>impairment loss had been recognised.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForImpairmentOfNonfinancialAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__177-1": {
   "value": "Financial <span class=\"_ _e\"></span>assets mea<span class=\"_ _2\"></span>sured at fair value through profit and loss<span class=\"_ _e\"></span> (FVTPL) All financial assets not cla<span class=\"_ _2\"></span>ssified as measured at amortised cost or FVOCI as described above are measured at FVTPLDerivative financial instruments and hedg<span class=\"_ _e\"></span>e accounting Deri<span class=\"_ _e\"></span>vative financia<span class=\"_ _2\"></span>l instruments The group<span class=\"_ _2\"></span> sometimes uses derivative financial instruments to hedge its exposure to foreign exchange, interest rat<span class=\"_ _e\"></span>e and commodity prices risks arising from oper<span class=\"_ _2\"></span>ating, financing and investment activities. In accordance with its treasury policy, the gr<span class=\"_ _e\"></span>oup neither holds nor issues der<span class=\"_ _2\"></span>ivative financial instruments for trading purposes. However, derivatives that do not qualify for hedge accounti<span class=\"_ _e\"></span>ng are accounted for as in<span class=\"_ _2\"></span>struments held for trading purposes.<span class=\"_ _e\"></span> Derivative fin<span class=\"_ _2\"></span>ancial instruments are initially rec<span class=\"_ _e\"></span>ognised at fair value. Any gain or loss resulting from changes in the fair valu<span class=\"_ _2\"></span>e is immediately boo<span class=\"_ _2\"></span>ked in the statement of profit or loss. Wh<span class=\"_ _e\"></span>ere derivative financial instruments qualify for<span class=\"_ _2\"></span> hedge accounting, the reflection of any resulting<span class=\"_ _2\"></span> gain or loss depends on the nature of the <span class=\"_ _e\"></span>item being hedged. The fa<span class=\"_ _2\"></span>ir value of interest <span class=\"_ _e\"></span>rate swaps is the estimated amount that the group would receive or pay to terminate the swap at the end of the repor<span class=\"_ _2\"></span>ting period, taking into account the current interest rates and the current creditworthiness of t<span class=\"_ _e\"></span>he swap counterparties and the group<span class=\"_ _2\"></span>. The fair value of forward exchange contracts is the<span class=\"_ _e\"></span>ir quoted market price at the end of the reporting period, i.e. the present value of the quoted for<span class=\"_ _2\"></span>ward price.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinancialInstrumentsAtFairValueThroughProfitOrLossExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__169-1": {
   "value": "Impairmen<span class=\"_ _e\"></span>t of financ<span class=\"_ _2\"></span>ial assets<span class=\"ff3f\"> </span>The group<span class=\"_ _2\"></span> recognises an allowance for expected credit losses (ECLs) for its debt instruments.<span class=\"_ _e\"></span> See Note 8.1 <span class=\"ff42\">\u2018</span>Credit risk<span class=\"ff42 ls1c\">\u2019,</span> for a detailed description of the ap<span class=\"_ _2\"></span>proachImpairment For trade<span class=\"_ _2\"></span> receivables and contract assets, the group a<span class=\"_ _e\"></span>pplies a simplified approach when calculating the Expected Credit Losses (ECLs). The impairment model is based on th<span class=\"_ _2\"></span>e expected credit lo<span class=\"_ _e\"></span>ss model. An individual approach is used for customer<span class=\"_ _2\"></span>s a<span class=\"_ _e\"></span>nd other counterpartie<span class=\"_ _2\"></span>s, for which the change in credit risk is monitored on an individual basis.<span class=\"_ _e\"></span> See N<span class=\"ls5b\">ot</span><span class=\"ff42\">e 8.1 \u2018Credit risk\u2019, for a detailed description of the model</span>.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForImpairmentOfFinancialAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__181": {
   "value": "3.3.9 <span class=\"_ _36\"> </span>Derivative financial instruments and hedg<span class=\"_ _e\"></span>e accounting Deri<span class=\"_ _e\"></span>vative financia<span class=\"_ _2\"></span>l instruments The group<span class=\"_ _2\"></span> sometimes uses derivative financial instruments to hedge its exposure to foreign exchange, interest rat<span class=\"_ _e\"></span>e and commodity prices risks arising from oper<span class=\"_ _2\"></span>ating, financing and investment activities. In accordance with its treasury policy, the gr<span class=\"_ _e\"></span>oup neither holds nor issues der<span class=\"_ _2\"></span>ivative financial instruments for trading purposes. However, derivatives that do not qualify for hedge accounti<span class=\"_ _e\"></span>ng are accounted for as in<span class=\"_ _2\"></span>struments held for trading purposes.<span class=\"_ _e\"></span> Derivative fin<span class=\"_ _2\"></span>ancial instruments are initially rec<span class=\"_ _e\"></span>ognised at fair value. Any gain or loss resulting from changes in the fair valu<span class=\"_ _2\"></span>e is immediately boo<span class=\"_ _2\"></span>ked in the statement of profit or loss. Wh<span class=\"_ _e\"></span>ere derivative financial instruments qualify for<span class=\"_ _2\"></span> hedge accounting, the reflection of any resulting<span class=\"_ _2\"></span> gain or loss depends on the nature of the <span class=\"_ _e\"></span>item being hedged. The fa<span class=\"_ _2\"></span>ir value of interest <span class=\"_ _e\"></span>rate swaps is the estimated amount that the group would receive or pay to terminate the swap at the end of the repor<span class=\"_ _2\"></span>ting period, taking into account the current interest rates and the current creditworthiness of t<span class=\"_ _e\"></span>he swap counterparties and the group<span class=\"_ _2\"></span>. The fair value of forward exchange contracts is the<span class=\"_ _e\"></span>ir quoted market price at the end of the reporting period, i.e. the present value of the quoted for<span class=\"_ _2\"></span>ward price.<span class=\"_ _e\"></span> Deri<span class=\"_ _e\"></span>vatives used as <span class=\"_ _2\"></span>hedging instruments Cash flow hedges Changes in<span class=\"_ _2\"></span> the fair value of the derivative hedging instrument designated as a cash-flow hedge a<span class=\"_ _e\"></span>re recognised directly in OCI to the extent that the hedge is e<span class=\"_ _2\"></span>ffective. If the hedge is ineffective, changes in fair value are recognised in profit or loss.<span class=\"_ _e\"></span> Th<span class=\"ls0\">e group uses forward currency contracts as hedges of its exposure to foreign currency risk in forecast transactions and firm </span>commitments, a<span class=\"_ _2\"></span>s well as forward commodity contracts for its exposure to volatility in the commodity prices. <span class=\"_ _e\"></span>The group designates only the spot element of <span class=\"_ _2\"></span>forward contracts as a hedged risk. The forward element is considered the cost of hedging and is<span class=\"_ _e\"></span> recognised in OCI and accumulated in a<span class=\"_ _2\"></span> separate component of the stateme<span class=\"_ _e\"></span>nt of financial position under hedging reserves. If the hedging instrumen<span class=\"_ _2\"></span>t no longer meets the criteria for hedge accounting, expires or is sold, terminated or exercised, hedge accounting is pro<span class=\"_ _2\"></span>spectively discontinued. The cumulative gain or loss previously recognised in OCI remains there until the fo<span class=\"_ _e\"></span>recast transact<span class=\"_ _2\"></span>ion occurs. When the hedged item is a non-fina<span class=\"_ _e\"></span>ncial asset, the amount recognised in OCI is transferred, where justified, to the carrying<span class=\"_ _2\"></span> amount of the asset. In other cases, the amount <span class=\"_ _e\"></span>recogn<span class=\"_ _2\"></span>ised in OCI is transferred to profit or loss in the same peri<span class=\"_ _e\"></span>od that the hedged item affects <span class=\"_ _2\"></span>profit or loss.<span class=\"_ _e\"></span> When a derivative or h<span class=\"_ _2\"></span>edge relationship is terminated, cumulative gains or losses still remain in OCI, provided that <span class=\"_ _e\"></span>the hedged transact<span class=\"_ _2\"></span>ion is still expected to occur. If the hedged transaction is no longer expected to take place, the cumulative unrealised gain or loss is remo<span class=\"_ _2\"></span>ved from OCI and is immediately recognised in profit or loss. The group<span class=\"_ _2\"></span> recognises derivatives to hedge the price for the future procurement of the physical requirement for grid losses t<span class=\"_ _e\"></span>hat is expected<span class=\"_ _2\"></span> in subsequent periods and is covered in each case by short-term procurement transactions on the spot <span class=\"_ _e\"></span>market.<span class=\"_ _2\"></span> These derivatives are measured at fair<span class=\"_ _2\"></span> value in OCI with no effect on profit or loss as part of cash flow hedge accounting; they se<span class=\"_ _e\"></span>rve as price hedging<span class=\"_ _2\"></span> of the physical demand for electrical energy to cover grid losses (underlying transaction). Due to the availability a<span class=\"_ _e\"></span>nd liquidity of future<span class=\"_ _2\"></span>s trading, the hedging period for intended price hedging covers a period of up to two years from the balance <span class=\"_ _e\"></span>sheet date. In this context, the group<span class=\"_ _2\"></span> pursues a conservative hedging strategy oriented towards the regulatory framework and the ability to roll over the electricity procur<span class=\"_ _2\"></span>ement costs incurred, which enables timely and predictable price hedgin<span class=\"_ _e\"></span>g.  The cr<span class=\"_ _2\"></span>itical term match method measures effectiveness. If the valuation-<span class=\"_ _e\"></span>relevant parameters of the hedged item and hedging instrument match, it <span class=\"_ _2\"></span>is assumed that an effective hedging relationship exists and that changes in value from both items <span class=\"_ _e\"></span>offset each other. The group strives for<span class=\"_ _2\"></span> full price hedging of the expected volume of grid loss energy (hedge ratio 1:1).<span class=\"_ _20\"></span> Hedging o<span class=\"_ _2\"></span>f monetary assets and liabilities<span class=\"_ _e\"></span> Hedge accounting is not applied<span class=\"_ _2\"></span> to derivative instruments that economically hedge monetary assets and liabilities denominated<span class=\"_ _e\"></span> in foreign<span class=\"_ _2\"></span> currencies. Changes in the fair value of such deriv<span class=\"_ _e\"></span>atives are recognised in profit or lo<span class=\"_ _2\"></span>ss <span class=\"_ _e\"></span><span class=\"ls5b\">as</span> fo<span class=\"_ _e\"></span>reign currency gains and losses.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForHedgingExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__180": {
   "value": "3.3.9 <span class=\"_ _36\"> </span>Derivative financial instruments and hedg<span class=\"_ _e\"></span>e accounting Deri<span class=\"_ _e\"></span>vative financia<span class=\"_ _2\"></span>l instruments The group<span class=\"_ _2\"></span> sometimes uses derivative financial instruments to hedge its exposure to foreign exchange, interest rat<span class=\"_ _e\"></span>e and commodity prices risks arising from oper<span class=\"_ _2\"></span>ating, financing and investment activities. In accordance with its treasury policy, the gr<span class=\"_ _e\"></span>oup neither holds nor issues der<span class=\"_ _2\"></span>ivative financial instruments for trading purposes. However, derivatives that do not qualify for hedge accounti<span class=\"_ _e\"></span>ng are accounted for as in<span class=\"_ _2\"></span>struments held for trading purposes.<span class=\"_ _e\"></span> Derivative fin<span class=\"_ _2\"></span>ancial instruments are initially rec<span class=\"_ _e\"></span>ognised at fair value. Any gain or loss resulting from changes in the fair valu<span class=\"_ _2\"></span>e is immediately boo<span class=\"_ _2\"></span>ked in the statement of profit or loss. Wh<span class=\"_ _e\"></span>ere derivative financial instruments qualify for<span class=\"_ _2\"></span> hedge accounting, the reflection of any resulting<span class=\"_ _2\"></span> gain or loss depends on the nature of the <span class=\"_ _e\"></span>item being hedged. The fa<span class=\"_ _2\"></span>ir value of interest <span class=\"_ _e\"></span>rate swaps is the estimated amount that the group would receive or pay to terminate the swap at the end of the repor<span class=\"_ _2\"></span>ting period, taking into account the current interest rates and the current creditworthiness of t<span class=\"_ _e\"></span>he swap counterparties and the group<span class=\"_ _2\"></span>. The fair value of forward exchange contracts is the<span class=\"_ _e\"></span>ir quoted market price at the end of the reporting period, i.e. the present value of the quoted for<span class=\"_ _2\"></span>ward price.<span class=\"_ _e\"></span> Deri<span class=\"_ _e\"></span>vatives used as <span class=\"_ _2\"></span>hedging instruments Cash flow hedges Changes in<span class=\"_ _2\"></span> the fair value of the derivative hedging instrument designated as a cash-flow hedge a<span class=\"_ _e\"></span>re recognised directly in OCI to the extent that the hedge is e<span class=\"_ _2\"></span>ffective. If the hedge is ineffective, changes in fair value are recognised in profit or loss.<span class=\"_ _e\"></span> Th<span class=\"ls0\">e group uses forward currency contracts as hedges of its exposure to foreign currency risk in forecast transactions and firm </span>commitments, a<span class=\"_ _2\"></span>s well as forward commodity contracts for its exposure to volatility in the commodity prices. <span class=\"_ _e\"></span>The group designates only the spot element of <span class=\"_ _2\"></span>forward contracts as a hedged risk. The forward element is considered the cost of hedging and is<span class=\"_ _e\"></span> recognised in OCI and accumulated in a<span class=\"_ _2\"></span> separate component of the stateme<span class=\"_ _e\"></span>nt of financial position under hedging reserves. If the hedging instrumen<span class=\"_ _2\"></span>t no longer meets the criteria for hedge accounting, expires or is sold, terminated or exercised, hedge accounting is pro<span class=\"_ _2\"></span>spectively discontinued. The cumulative gain or loss previously recognised in OCI remains there until the fo<span class=\"_ _e\"></span>recast transact<span class=\"_ _2\"></span>ion occurs. When the hedged item is a non-fina<span class=\"_ _e\"></span>ncial asset, the amount recognised in OCI is transferred, where justified, to the carrying<span class=\"_ _2\"></span> amount of the asset. In other cases, the amount <span class=\"_ _e\"></span>recogn<span class=\"_ _2\"></span>ised in OCI is transferred to profit or loss in the same peri<span class=\"_ _e\"></span>od that the hedged item affects <span class=\"_ _2\"></span>profit or loss.<span class=\"_ _e\"></span> When a derivative or h<span class=\"_ _2\"></span>edge relationship is terminated, cumulative gains or losses still remain in OCI, provided that <span class=\"_ _e\"></span>the hedged transact<span class=\"_ _2\"></span>ion is still expected to occur. If the hedged transaction is no longer expected to take place, the cumulative unrealised gain or loss is remo<span class=\"_ _2\"></span>ved from OCI and is immediately recognised in profit or loss. The group<span class=\"_ _2\"></span> recognises derivatives to hedge the price for the future procurement of the physical requirement for grid losses t<span class=\"_ _e\"></span>hat is expected<span class=\"_ _2\"></span> in subsequent periods and is covered in each case by short-term procurement transactions on the spot <span class=\"_ _e\"></span>market.<span class=\"_ _2\"></span> These derivatives are measured at fair<span class=\"_ _2\"></span> value in OCI with no effect on profit or loss as part of cash flow hedge accounting; they se<span class=\"_ _e\"></span>rve as price hedging<span class=\"_ _2\"></span> of the physical demand for electrical energy to cover grid losses (underlying transaction). Due to the availability a<span class=\"_ _e\"></span>nd liquidity of future<span class=\"_ _2\"></span>s trading, the hedging period for intended price hedging covers a period of up to two years from the balance <span class=\"_ _e\"></span>sheet date. In this context, the group<span class=\"_ _2\"></span> pursues a conservative hedging strategy oriented towards the regulatory framework and the ability to roll over the electricity procur<span class=\"_ _2\"></span>ement costs incurred, which enables timely and predictable price hedgin<span class=\"_ _e\"></span>g.  The cr<span class=\"_ _2\"></span>itical term match method measures effectiveness. If the valuation-<span class=\"_ _e\"></span>relevant parameters of the hedged item and hedging instrument match, it <span class=\"_ _2\"></span>is assumed that an effective hedging relationship exists and that changes in value from both items <span class=\"_ _e\"></span>offset each other. The group strives for<span class=\"_ _2\"></span> full price hedging of the expected volume of grid loss energy (hedge ratio 1:1).<span class=\"_ _20\"></span> Hedging o<span class=\"_ _2\"></span>f monetary assets and liabilities<span class=\"_ _e\"></span> Hedge accounting is not applied<span class=\"_ _2\"></span> to derivative instruments that economically hedge monetary assets and liabilities denominated<span class=\"_ _e\"></span> in foreign<span class=\"_ _2\"></span> currencies. Changes in the fair value of such deriv<span class=\"_ _e\"></span>atives are recognised in profit or lo<span class=\"_ _2\"></span>ss <span class=\"_ _e\"></span><span class=\"ls5b\">as</span> fo<span class=\"_ _e\"></span>reign currency gains and losses.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDerivativeFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__179": {
   "value": "3.3.9 <span class=\"_ _36\"> </span>Derivative financial instruments and hedg<span class=\"_ _e\"></span>e accounting Deri<span class=\"_ _e\"></span>vative financia<span class=\"_ _2\"></span>l instruments The group<span class=\"_ _2\"></span> sometimes uses derivative financial instruments to hedge its exposure to foreign exchange, interest rat<span class=\"_ _e\"></span>e and commodity prices risks arising from oper<span class=\"_ _2\"></span>ating, financing and investment activities. In accordance with its treasury policy, the gr<span class=\"_ _e\"></span>oup neither holds nor issues der<span class=\"_ _2\"></span>ivative financial instruments for trading purposes. However, derivatives that do not qualify for hedge accounti<span class=\"_ _e\"></span>ng are accounted for as in<span class=\"_ _2\"></span>struments held for trading purposes.<span class=\"_ _e\"></span> Derivative fin<span class=\"_ _2\"></span>ancial instruments are initially rec<span class=\"_ _e\"></span>ognised at fair value. Any gain or loss resulting from changes in the fair valu<span class=\"_ _2\"></span>e is immediately boo<span class=\"_ _2\"></span>ked in the statement of profit or loss. Wh<span class=\"_ _e\"></span>ere derivative financial instruments qualify for<span class=\"_ _2\"></span> hedge accounting, the reflection of any resulting<span class=\"_ _2\"></span> gain or loss depends on the nature of the <span class=\"_ _e\"></span>item being hedged. The fa<span class=\"_ _2\"></span>ir value of interest <span class=\"_ _e\"></span>rate swaps is the estimated amount that the group would receive or pay to terminate the swap at the end of the repor<span class=\"_ _2\"></span>ting period, taking into account the current interest rates and the current creditworthiness of t<span class=\"_ _e\"></span>he swap counterparties and the group<span class=\"_ _2\"></span>. The fair value of forward exchange contracts is the<span class=\"_ _e\"></span>ir quoted market price at the end of the reporting period, i.e. the present value of the quoted for<span class=\"_ _2\"></span>ward price.<span class=\"_ _e\"></span> Deri<span class=\"_ _e\"></span>vatives used as <span class=\"_ _2\"></span>hedging instruments Cash flow hedges Changes in<span class=\"_ _2\"></span> the fair value of the derivative hedging instrument designated as a cash-flow hedge a<span class=\"_ _e\"></span>re recognised directly in OCI to the extent that the hedge is e<span class=\"_ _2\"></span>ffective. If the hedge is ineffective, changes in fair value are recognised in profit or loss.<span class=\"_ _e\"></span> Th<span class=\"ls0\">e group uses forward currency contracts as hedges of its exposure to foreign currency risk in forecast transactions and firm </span>commitments, a<span class=\"_ _2\"></span>s well as forward commodity contracts for its exposure to volatility in the commodity prices. <span class=\"_ _e\"></span>The group designates only the spot element of <span class=\"_ _2\"></span>forward contracts as a hedged risk. The forward element is considered the cost of hedging and is<span class=\"_ _e\"></span> recognised in OCI and accumulated in a<span class=\"_ _2\"></span> separate component of the stateme<span class=\"_ _e\"></span>nt of financial position under hedging reserves. If the hedging instrumen<span class=\"_ _2\"></span>t no longer meets the criteria for hedge accounting, expires or is sold, terminated or exercised, hedge accounting is pro<span class=\"_ _2\"></span>spectively discontinued. The cumulative gain or loss previously recognised in OCI remains there until the fo<span class=\"_ _e\"></span>recast transact<span class=\"_ _2\"></span>ion occurs. When the hedged item is a non-fina<span class=\"_ _e\"></span>ncial asset, the amount recognised in OCI is transferred, where justified, to the carrying<span class=\"_ _2\"></span> amount of the asset. In other cases, the amount <span class=\"_ _e\"></span>recogn<span class=\"_ _2\"></span>ised in OCI is transferred to profit or loss in the same peri<span class=\"_ _e\"></span>od that the hedged item affects <span class=\"_ _2\"></span>profit or loss.<span class=\"_ _e\"></span> When a derivative or h<span class=\"_ _2\"></span>edge relationship is terminated, cumulative gains or losses still remain in OCI, provided that <span class=\"_ _e\"></span>the hedged transact<span class=\"_ _2\"></span>ion is still expected to occur. If the hedged transaction is no longer expected to take place, the cumulative unrealised gain or loss is remo<span class=\"_ _2\"></span>ved from OCI and is immediately recognised in profit or loss. The group<span class=\"_ _2\"></span> recognises derivatives to hedge the price for the future procurement of the physical requirement for grid losses t<span class=\"_ _e\"></span>hat is expected<span class=\"_ _2\"></span> in subsequent periods and is covered in each case by short-term procurement transactions on the spot <span class=\"_ _e\"></span>market.<span class=\"_ _2\"></span> These derivatives are measured at fair<span class=\"_ _2\"></span> value in OCI with no effect on profit or loss as part of cash flow hedge accounting; they se<span class=\"_ _e\"></span>rve as price hedging<span class=\"_ _2\"></span> of the physical demand for electrical energy to cover grid losses (underlying transaction). Due to the availability a<span class=\"_ _e\"></span>nd liquidity of future<span class=\"_ _2\"></span>s trading, the hedging period for intended price hedging covers a period of up to two years from the balance <span class=\"_ _e\"></span>sheet date. In this context, the group<span class=\"_ _2\"></span> pursues a conservative hedging strategy oriented towards the regulatory framework and the ability to roll over the electricity procur<span class=\"_ _2\"></span>ement costs incurred, which enables timely and predictable price hedgin<span class=\"_ _e\"></span>g.  The cr<span class=\"_ _2\"></span>itical term match method measures effectiveness. If the valuation-<span class=\"_ _e\"></span>relevant parameters of the hedged item and hedging instrument match, it <span class=\"_ _2\"></span>is assumed that an effective hedging relationship exists and that changes in value from both items <span class=\"_ _e\"></span>offset each other. The group strives for<span class=\"_ _2\"></span> full price hedging of the expected volume of grid loss energy (hedge ratio 1:1).<span class=\"_ _20\"></span> Hedging o<span class=\"_ _2\"></span>f monetary assets and liabilities<span class=\"_ _e\"></span> Hedge accounting is not applied<span class=\"_ _2\"></span> to derivative instruments that economically hedge monetary assets and liabilities denominated<span class=\"_ _e\"></span> in foreign<span class=\"_ _2\"></span> currencies. Changes in the fair value of such deriv<span class=\"_ _e\"></span>atives are recognised in profit or lo<span class=\"_ _2\"></span>ss <span class=\"_ _e\"></span><span class=\"ls5b\">as</span> fo<span class=\"_ _e\"></span>reign currency gains and losses.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDerivativeFinancialInstrumentsAndHedgingExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__182": {
   "value": "Share <span class=\"_ _e\"></span>capital <span class=\"ff43\">\u2013</span> transaction costs Transa<span class=\"_ _2\"></span>ction costs related to the issuing of capital are ded<span class=\"_ _e\"></span>ucted from the capital received. Share <span class=\"_ _e\"></span>capital <span class=\"ff43\">\u2013</span> share-based pay<span class=\"_ _2\"></span>ment expenses Share-based payment expenses are a<span class=\"_ _2\"></span>dded to the capital receiv<span class=\"ls5b\">ed.<span class=\"_ _e\"></span></span>",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIssuedCapitalExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__183": {
   "value": "Dividends Dividends are re<span class=\"_ _2\"></span>cognised as a liability in the period in which they are decl<span class=\"_ _e\"></span>ared (see note 6.12.1<span class=\"_ _2\"></span>).",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDividendsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__185": {
   "value": "Treasury shares When <span class=\"_ _e\"></span>shares <span class=\"_ _e\"></span>recognised <span class=\"_ _20\"></span>as <span class=\"_ _e\"></span>equity <span class=\"_ _20\"></span>are <span class=\"_ _e\"></span>repurchased, <span class=\"_ _e\"></span>the<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>amou<span class=\"_ _2\"></span>nt <span class=\"_ _e\"></span>of <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>conside<span class=\"_ _20\"></span>ratio<span class=\"_ _2\"></span>n <span class=\"_ _20\"></span>pa<span class=\"_ _2\"></span>id, <span class=\"_ _20\"></span>which inclu<span class=\"_ _e\"></span>des <span class=\"_ _e\"></span>directly<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>attributable <span class=\"_ _20\"></span>costs, is<span class=\"_ _e\"></span> recogn<span class=\"_ _2\"></span>ised <span class=\"_ _e\"></span>as <span class=\"_ _20\"></span>a <span class=\"_ _e\"></span>change <span class=\"_ _e\"></span>in <span class=\"_ _20\"></span>equity. Re<span class=\"_ _e\"></span>purchased <span class=\"_ _e\"></span>shares <span class=\"_ _20\"></span>are classified <span class=\"_ _20\"></span>as <span class=\"_ _e\"></span>treasury <span class=\"_ _e\"></span>shares <span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>nd <span class=\"_ _e\"></span>are<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>deducted <span class=\"_ _e\"></span>f<span class=\"_ _e\"></span>rom <span class=\"_ _e\"></span>equity. <span class=\"_ _e\"></span>The <span class=\"_ _e\"></span>am<span class=\"_ _e\"></span>ount <span class=\"_ _e\"></span>of<span class=\"_ _e\"></span> treasur<span class=\"_ _2\"></span>y <span class=\"_ _20\"></span>shares <span class=\"_ _20\"></span>held <span class=\"_ _20\"></span>is <span class=\"_ _20\"></span>disclos<span class=\"_ _e\"></span>ed <span class=\"_ _20\"></span>in <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>treasury <span class=\"_ _20\"></span>share <span class=\"_ _20\"></span>reserve. <span class=\"_ _20\"></span>When <span class=\"_ _20\"></span>treasury <span class=\"_ _20\"></span>shares <span class=\"_ _20\"></span>are <span class=\"_ _20\"></span>subsequently<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>sold <span class=\"_ _20\"></span>or <span class=\"_ _20\"></span>reissued, <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>amount received <span class=\"_ _4b\"></span>is recognised <span class=\"_ _4b\"></span>as an <span class=\"_ _2\"></span>incre<span class=\"_ _2\"></span>ase <span class=\"_ _2\"></span>in <span class=\"_ _2\"></span>equity a<span class=\"_ _2\"></span>nd <span class=\"_ _2\"></span>the <span class=\"_ _4b\"></span>r<span class=\"_ _e\"></span>esulting <span class=\"_ _2\"></span>surplus <span class=\"_ _2\"></span>or <span class=\"_ _2\"></span>deficit <span class=\"_ _4b\"></span>o<span class=\"_ _e\"></span>n <span class=\"_ _2\"></span>the <span class=\"_ _4b\"></span>t<span class=\"_ _e\"></span>ransaction is <span class=\"_ _4b\"></span>presented within <span class=\"_ _4b\"></span>r<span class=\"_ _20\"></span>etained <span class=\"_ _4b\"></span>e<span class=\"_ _e\"></span>arnings. No gain or loss is r<span class=\"_ _2\"></span>ecognised in profit or loss on<span class=\"_ _e\"></span> the purchase, sale, <span class=\"_ _2\"></span>issue or cancellation of treasury shares.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForTreasurySharesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__186": {
   "value": "Share-b<span class=\"_ _e\"></span>ased pay<span class=\"_ _2\"></span>ments The co<span class=\"_ _2\"></span>st of share-based payment transactions is reflecte<span class=\"_ _e\"></span>d in the in<span class=\"_ _2\"></span>come statement. The stock options are valued at grant date, based on the share<span class=\"_ _2\"></span> price at grant date, business evolution, exercise price and interest rates. Stock option plan cost is taken into result on a straight-<span class=\"_ _2\"></span>line basis from the grant date until the end of the vesting period.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForSharebasedPaymentTransactionsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__188": {
   "value": "3.3.11 <span class=\"_ _1dd\"> </span>Financial <span class=\"_ _e\"></span>liabilities Financial lia<span class=\"_ _2\"></span>bilities consist of interest-b<span class=\"_ _e\"></span>earing loans and borro<span class=\"_ _2\"></span>wings in the group. They are initially r<span class=\"_ _e\"></span>ecognised at fair value, less related transact<span class=\"_ _2\"></span>ion costs. Subsequent to initial recognition, interest<span class=\"_ _e\"></span>-bearing loans and borrowings are stated at amortised c<span class=\"_ _e\"></span>ost price with any differen<span class=\"_ _2\"></span>ce between amount at initial recognition a<span class=\"_ _e\"></span>nd redemption value being recognised in profit or loss over the period of the loans on an effe<span class=\"_ _2\"></span>ctive interest basis. A financial liability is d<span class=\"_ _2\"></span>erecognised when the obligati<span class=\"_ _e\"></span>on under the liability is disch<span class=\"_ _2\"></span>arged or cancelled or expires. When an existing financial liability is replace<span class=\"_ _2\"></span>d by another from the same lender on substantially different terms, or the terms of an existing<span class=\"_ _e\"></span> liability are substantia<span class=\"_ _2\"></span>lly modified, such an exchange or modification i<span class=\"_ _e\"></span>s treated as the derecognition of the original liability and the recognition of a new liability. T<span class=\"_ _2\"></span>he difference in the respective carrying amounts is recognised in th<span class=\"_ _e\"></span>e statement of profit or loss. Financial a<span class=\"_ _2\"></span>ssets and financial liabilities are offset and the net amount is reported in the consolidated statement of financial position if there is a currently enfor<span class=\"_ _2\"></span>ceable legal right to offset the rec<span class=\"_ _e\"></span>ognised amounts and there is an inten<span class=\"_ _2\"></span>tion to settle on a net ba<span class=\"_ _e\"></span>sis, to realise the assets<span class=\"_ _2\"></span> and settle the liabilities simultaneously.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForBorrowingsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__187": {
   "value": "3.3.11 <span class=\"_ _1dd\"> </span>Financial <span class=\"_ _e\"></span>liabilities Financial lia<span class=\"_ _2\"></span>bilities consist of interest-b<span class=\"_ _e\"></span>earing loans and borro<span class=\"_ _2\"></span>wings in the group. They are initially r<span class=\"_ _e\"></span>ecognised at fair value, less related transact<span class=\"_ _2\"></span>ion costs. Subsequent to initial recognition, interest<span class=\"_ _e\"></span>-bearing loans and borrowings are stated at amortised c<span class=\"_ _e\"></span>ost price with any differen<span class=\"_ _2\"></span>ce between amount at initial recognition a<span class=\"_ _e\"></span>nd redemption value being recognised in profit or loss over the period of the loans on an effe<span class=\"_ _2\"></span>ctive interest basis. A financial liability is d<span class=\"_ _2\"></span>erecognised when the obligati<span class=\"_ _e\"></span>on under the liability is disch<span class=\"_ _2\"></span>arged or cancelled or expires. When an existing financial liability is replace<span class=\"_ _2\"></span>d by another from the same lender on substantially different terms, or the terms of an existing<span class=\"_ _e\"></span> liability are substantia<span class=\"_ _2\"></span>lly modified, such an exchange or modification i<span class=\"_ _e\"></span>s treated as the derecognition of the original liability and the recognition of a new liability. T<span class=\"_ _2\"></span>he difference in the respective carrying amounts is recognised in th<span class=\"_ _e\"></span>e statement of profit or loss. Financial a<span class=\"_ _2\"></span>ssets and financial liabilities are offset and the net amount is reported in the consolidated statement of financial position if there is a currently enfor<span class=\"_ _2\"></span>ceable legal right to offset the rec<span class=\"_ _e\"></span>ognised amounts and there is an inten<span class=\"_ _2\"></span>tion to settle on a net ba<span class=\"_ _e\"></span>sis, to realise the assets<span class=\"_ _2\"></span> and settle the liabilities simultaneously.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinancialLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__189": {
   "value": "3.3.12 <span class=\"_ _24f\"> </span>Employee benefits Defin<span class=\"_ _e\"></span>ed-contri<span class=\"_ _2\"></span>bution plans In Belgium, <span class=\"_ _2\"></span>contribution based promises, called defined-c<span class=\"_ _e\"></span>ontribution pension plans under Belgian pension legislatio<span class=\"_ _e\"></span>n, are c<span class=\"_ _2\"></span>lassified as defined-benefit plans for accounting purpose<span class=\"_ _2\"></span>s due to the legal minimum return to be guaranteed by the employer. <span class=\"_ _e\"></span> Before 1 <span class=\"_ _2\"></span>January 2016, the legal minimum return was 3.75%<span class=\"_ _e\"></span> on emp<span class=\"_ _2\"></span>loyee contributions, 3.25% on employe<span class=\"_ _e\"></span>r contributions and 0% for inactive plan<span class=\"_ _2\"></span> participants<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> From<span class=\"_ _2\"></span> 1 January 2016 onwards, the legal minimum return <span class=\"_ _e\"></span>is a variab<span class=\"_ _2\"></span>le rate between 1.75% and 3.75%. T<span class=\"_ _e\"></span>he interest rate is automatically adapted on <span class=\"ls5b\">1 </span>January each year based on the average return OLO 10 years over 24 months, with 1.75% as a minimum. As of <span class=\"_ _e\"></span>1 Januar<span class=\"_ _2\"></span>y 2016, the legal minimum return is 1.75% on empl<span class=\"_ _e\"></span>oyee and employer<span class=\"_ _2\"></span> co<span class=\"_ _e\"></span>ntributions and 0% for inactive plan participants.<span class=\"_ _e\"></span> As the plans <span class=\"_ _2\"></span>are funded via a pension fund, the vertical approach is applied, meaning that 1.75% is applied on all the reserves (even before 2016). The employer needs to f<span class=\"_ _2\"></span>inance the deficits related to the <span class=\"_ _e\"></span><span class=\"ff42\">\u201cLaw on Supplementary Pensions</span> (LSP) guarantee at any <span class=\"_ _e\"></span>time for the employee contract a<span class=\"_ _2\"></span>nd at the moment the vested reserve<span class=\"_ _e\"></span>s are transferred in case of departure, retirement or liquidation of the pension for the emp<span class=\"_ _2\"></span>loyer contract.<span class=\"_ _e\"></span> For each plan, th<span class=\"_ _2\"></span>e fair value of assets equals the sum of the accrued individual reserves (if any) and the value of the colle<span class=\"_ _e\"></span>ctive fund(s) (if any). The Defined-Benefit Ob<span class=\"_ _2\"></span>ligation (DBO) was determined fol<span class=\"_ _e\"></span>lowing the Pr<span class=\"_ _2\"></span>ojected Unit C<span class=\"_ _e\"></span>redit (PUC) method. The plan formula (backloaded or not) determines whether the premium<span class=\"_ _2\"></span>s are projected. <span class=\"_ _e\"></span> In Germany, the defined-<span class=\"_ _2\"></span>contribution <span class=\"_ _e\"></span>plan comprises a fixed pension to be paid to an employee upon retirement, which is usually based on one<span class=\"_ _2\"></span> or more <span class=\"ff42\">factors such as the employee\u2019s age, years of service and salary.</span>  In both<span class=\"_ _2\"></span> countries, the calculation is performed by an accr<span class=\"_ _e\"></span>edited actuary. Defin<span class=\"_ _e\"></span>ed-benefit <span class=\"_ _2\"></span>plan<span class=\"_ _e\"></span>s For defined-benefit plans, which exist in both Belgium and Germany, the pension expenses for each plan are assessed separately <span class=\"ls5b\">on </span>an annual ba<span class=\"_ _2\"></span>sis by accredited actuaries using the PUC m<span class=\"_ _e\"></span>ethod. The estimated future benefit that emplo<span class=\"_ _2\"></span>yees have <span class=\"_ _e\"></span>earned in return for their ser<span class=\"_ _2\"></span>vice in the current and previous periods is discounted to determine its present value, and the fair value of any plan assets is deducted. T<span class=\"_ _2\"></span>he discount rate is the inte<span class=\"_ _e\"></span>rest rate, at the end of the reporting period, on high quality bonds that have maturity dates appro<span class=\"_ _2\"></span>ximately equivalent <span class=\"ls1d\">to</span> th<span class=\"_ _e\"></span>e terms of the group's obligations and that are denominated in the currency in which the benefits are expected<span class=\"_ _2\"></span> to be paid. When the bene<span class=\"_ _2\"></span>fits of a plan are improved, the portion of the increased benefit relating to past service by employees is reco<span class=\"_ _2\"></span>g<span class=\"_ _e\"></span>nised as an expense in profit or lo<span class=\"_ _2\"></span>ss at the earlier of the following dates:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">when th<span class=\"_ _2\"></span>e plan amendment or curtailment occurs; or<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">when t<span class=\"_ _2\"></span>he entity recognises related restructuring costs under IAS<span class=\"_ _e\"></span> 37 or termination benefits. </span></span>Where the calcula<span class=\"_ _2\"></span>tion results in a benefit to the gr<span class=\"_ _e\"></span>oup, the recognised asset is limited to the present value of any future r<span class=\"_ _2\"></span>efunds from the plan or<span class=\"_ _2\"></span> reductions in future contributions to the plan. <span class=\"_ _e\"></span> Remeasurements <span class=\"ff42\">\u2013</span> comprising actuarial g<span class=\"_ _2\"></span>ains and losse<span class=\"_ _e\"></span>s, the effect of <span class=\"_ _2\"></span>the asset ceiling <span class=\"_ _e\"></span>(excluding amounts included in net interest on the net defined-benefit liab<span class=\"_ _2\"></span>ility<span class=\"_ _e\"></span>) and the return on plan a<span class=\"_ _2\"></span>ssets (excluding amounts included in net<span class=\"_ _e\"></span> interest on the net defined-benefit liability) <span class=\"ff42\">\u2013</span> are re<span class=\"_ _2\"></span>cognised immediately in the statement of financial position with a corresponding debit or credit to retained earnings through OCI in the period in which they occur. Remeasuremen<span class=\"_ _2\"></span>ts are not reclassified to profit or loss in subsequent periods. <span class=\"_ _e\"></span><span class=\"ff40 fs11\"> </span>Reimbur<span class=\"_ _e\"></span>sement rights (Belgium) Reimbursemen<span class=\"_ _2\"></span>t rights are recognised as a separate asset when, and only when, it is virtually certain that another par<span class=\"_ _e\"></span>ty will reimburse some or all of <span class=\"_ _2\"></span>the expenditure required to settle the corresponding benefit obligation. Rei<span class=\"_ _e\"></span>mbursement rights are presented as non-curren<span class=\"_ _2\"></span>t assets under other financial assets and are measured at fair value. <span class=\"_ _e\"></span>These rights are handled the same way as the correspondin<span class=\"_ _2\"></span>g defined-benefit obligation. When <span class=\"_ _e\"></span>the changes in the period result from changes in financial assumptions or from experien<span class=\"_ _2\"></span>ce adjustments or changes in demographic assu<span class=\"_ _e\"></span>mptions, then the asset is adjusted through OCI. The components of the defined-benefit cost are recog<span class=\"_ _2\"></span>nised net of amounts relatin<span class=\"_ _e\"></span>g to changes in the carrying amount o<span class=\"_ _2\"></span>f the rights to reimb<span class=\"_ _e\"></span>ursement.<span class=\"_ _e\"></span> Other long-term <span class=\"_ _e\"></span>employ<span class=\"_ _2\"></span>ee benefits The group<span class=\"_ _2\"></span>'s net obligation regarding long-t<span class=\"_ _e\"></span>erm service benefits other than pension plans is assessed on an annual basis by accredited actuarie<span class=\"_ _2\"></span>s. The net obligation is calculated using the PUC <span class=\"_ _e\"></span>method and is the amount of future benefit that emplo<span class=\"_ _2\"></span>yee<span class=\"_ _e\"></span>s have earned in return for<span class=\"_ _2\"></span> their service in the current and previous periods. The <span class=\"_ _e\"></span>obligation is discounted to its present value, and the fair value of any related<span class=\"_ _2\"></span> assets is deducted. The discount rate is the yield, <span class=\"_ _e\"></span>at the end o<span class=\"_ _2\"></span>f the reporting period<span class=\"_ _e\"></span>, on high quality bonds that have maturity dates appro<span class=\"_ _2\"></span>ximately equivalent to the terms of the g<span class=\"_ _e\"></span>roup's obligations and that are denominated in the currency in which the bene<span class=\"_ _2\"></span>fits are expected<span class=\"_ _2\"></span> to be paid.<span class=\"_ _e\"></span> Short-term <span class=\"_ _e\"></span>employ<span class=\"_ _2\"></span>ee benefits Short-term employe<span class=\"_ _2\"></span>e benefits are measured on an undisc<span class=\"_ _e\"></span>ounted basis and are expensed as the<span class=\"_ _2\"></span> related service is p<span class=\"_ _e\"></span>rovided. A liability is recogn<span class=\"_ _2\"></span>ised for the amount expected to be paid out under a short<span class=\"_ _e\"></span>-term cash bonus or profit-sharing plans if the group has a legal or construct<span class=\"_ _2\"></span>ive obligation to pay this amount as a result of the <span class=\"ff42\">employee\u2019s </span>past service and the obligation c<span class=\"_ _e\"></span>an be reliably estimated.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForEmployeeBenefitsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__190-1": {
   "value": "Defin<span class=\"_ _e\"></span>ed-contri<span class=\"_ _2\"></span>bution plans In Belgium, <span class=\"_ _2\"></span>contribution based promises, called defined-c<span class=\"_ _e\"></span>ontribution pension plans under Belgian pension legislatio<span class=\"_ _e\"></span>n, are c<span class=\"_ _2\"></span>lassified as defined-benefit plans for accounting purpose<span class=\"_ _2\"></span>s due to the legal minimum return to be guaranteed by the employer. <span class=\"_ _e\"></span> Before 1 <span class=\"_ _2\"></span>January 2016, the legal minimum return was 3.75%<span class=\"_ _e\"></span> on emp<span class=\"_ _2\"></span>loyee contributions, 3.25% on employe<span class=\"_ _e\"></span>r contributions and 0% for inactive plan<span class=\"_ _2\"></span> participants<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> From<span class=\"_ _2\"></span> 1 January 2016 onwards, the legal minimum return <span class=\"_ _e\"></span>is a variab<span class=\"_ _2\"></span>le rate between 1.75% and 3.75%. T<span class=\"_ _e\"></span>he interest rate is automatically adapted on <span class=\"ls5b\">1 </span>January each year based on the average return OLO 10 years over 24 months, with 1.75% as a minimum. As of <span class=\"_ _e\"></span>1 Januar<span class=\"_ _2\"></span>y 2016, the legal minimum return is 1.75% on empl<span class=\"_ _e\"></span>oyee and employer<span class=\"_ _2\"></span> co<span class=\"_ _e\"></span>ntributions and 0% for inactive plan participants.<span class=\"_ _e\"></span> As the plans <span class=\"_ _2\"></span>are funded via a pension fund, the vertical approach is applied, meaning that 1.75% is applied on all the reserves (even before 2016). The employer needs to f<span class=\"_ _2\"></span>inance the deficits related to the <span class=\"_ _e\"></span><span class=\"ff42\">\u201cLaw on Supplementary Pensions</span> (LSP) guarantee at any <span class=\"_ _e\"></span>time for the employee contract a<span class=\"_ _2\"></span>nd at the moment the vested reserve<span class=\"_ _e\"></span>s are transferred in case of departure, retirement or liquidation of the pension for the emp<span class=\"_ _2\"></span>loyer contract.<span class=\"_ _e\"></span> For each plan, th<span class=\"_ _2\"></span>e fair value of assets equals the sum of the accrued individual reserves (if any) and the value of the colle<span class=\"_ _e\"></span>ctive fund(s) (if any). The Defined-Benefit Ob<span class=\"_ _2\"></span>ligation (DBO) was determined fol<span class=\"_ _e\"></span>lowing the Pr<span class=\"_ _2\"></span>ojected Unit C<span class=\"_ _e\"></span>redit (PUC) method. The plan formula (backloaded or not) determines whether the premium<span class=\"_ _2\"></span>s are projected. <span class=\"_ _e\"></span> In Germany, the defined-<span class=\"_ _2\"></span>contribution <span class=\"_ _e\"></span>plan comprises a fixed pension to be paid to an employee upon retirement, which is usually based on one<span class=\"_ _2\"></span> or more <span class=\"ff42\">factors such as the employee\u2019s age, years of service and salary.</span>  In both<span class=\"_ _2\"></span> countries, the calculation is performed by an accr<span class=\"_ _e\"></span>edited actuary. Defin<span class=\"_ _e\"></span>ed-benefit <span class=\"_ _2\"></span>plan<span class=\"_ _e\"></span>s For defined-benefit plans, which exist in both Belgium and Germany, the pension expenses for each plan are assessed separately <span class=\"ls5b\">on </span>an annual ba<span class=\"_ _2\"></span>sis by accredited actuaries using the PUC m<span class=\"_ _e\"></span>ethod. The estimated future benefit that emplo<span class=\"_ _2\"></span>yees have <span class=\"_ _e\"></span>earned in return for their ser<span class=\"_ _2\"></span>vice in the current and previous periods is discounted to determine its present value, and the fair value of any plan assets is deducted. T<span class=\"_ _2\"></span>he discount rate is the inte<span class=\"_ _e\"></span>rest rate, at the end of the reporting period, on high quality bonds that have maturity dates appro<span class=\"_ _2\"></span>ximately equivalent <span class=\"ls1d\">to</span> th<span class=\"_ _e\"></span>e terms of the group's obligations and that are denominated in the currency in which the benefits are expected<span class=\"_ _2\"></span> to be paid. When the bene<span class=\"_ _2\"></span>fits of a plan are improved, the portion of the increased benefit relating to past service by employees is reco<span class=\"_ _2\"></span>g<span class=\"_ _e\"></span>nised as an expense in profit or lo<span class=\"_ _2\"></span>ss at the earlier of the following dates:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">when th<span class=\"_ _2\"></span>e plan amendment or curtailment occurs; or<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">when t<span class=\"_ _2\"></span>he entity recognises related restructuring costs under IAS<span class=\"_ _e\"></span> 37 or termination benefits. </span></span>Where the calcula<span class=\"_ _2\"></span>tion results in a benefit to the gr<span class=\"_ _e\"></span>oup, the recognised asset is limited to the present value of any future r<span class=\"_ _2\"></span>efunds from the plan or<span class=\"_ _2\"></span> reductions in future contributions to the plan. <span class=\"_ _e\"></span> Remeasurements <span class=\"ff42\">\u2013</span> comprising actuarial g<span class=\"_ _2\"></span>ains and losse<span class=\"_ _e\"></span>s, the effect of <span class=\"_ _2\"></span>the asset ceiling <span class=\"_ _e\"></span>(excluding amounts included in net interest on the net defined-benefit liab<span class=\"_ _2\"></span>ility<span class=\"_ _e\"></span>) and the return on plan a<span class=\"_ _2\"></span>ssets (excluding amounts included in net<span class=\"_ _e\"></span> interest on the net defined-benefit liability) <span class=\"ff42\">\u2013</span> are re<span class=\"_ _2\"></span>cognised immediately in the statement of financial position with a corresponding debit or credit to retained earnings through OCI in the period in which they occur. Remeasuremen<span class=\"_ _2\"></span>ts are not reclassified to profit or loss in subsequent periods.3.3.13 <span class=\"_ _1dd\"> </span>Provisions A provision is recogn<span class=\"_ _2\"></span>ised in the balance sheet when the g<span class=\"_ _e\"></span>roup has a current legal or constructive obligation as a result of a past event and it is likely that an<span class=\"_ _2\"></span> outflow of economic benefits <span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span> of which a reliable estimate can be made <span class=\"ff42\">\u2013</span> will be required to settle the obligation. If the e<span class=\"_ _2\"></span>ffect is material, provisions are determined by discounting the expected future cash flows at a pre<span class=\"_ _e\"></span>-tax rate that reflects the current market assessment of <span class=\"_ _2\"></span>the time value of money and, where appropriate, of the risks specific to the liability.<span class=\"_ _e\"></span> The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s main long<span class=\"ff3f\">-term provisions <span class=\"_ _e\"></span>are provisions for dismantling<span class=\"_ _2\"></span> obligations. The present value of the obligation at the time of </span></span>commissioning re<span class=\"_ _2\"></span>presents the initial amount of the provision for dismantling with, as the counterpart, an asset for the same <span class=\"_ _e\"></span>amount, which is included<span class=\"_ _2\"></span> in the carrying amount of the related pro<span class=\"_ _e\"></span>perty, plant and equipment and is depreciated over the asset'<span class=\"_ _e\"></span>s entire useful life.  Factor<span class=\"_ _2\"></span>s having a significant influence on the amount of provisions include: <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">cost est<span class=\"_ _2\"></span>imates <span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the t<span class=\"_ _2\"></span>iming of expenditure ; and  </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the d<span class=\"_ _2\"></span>iscount rate applied to cash flows. </span></span>These factor<span class=\"_ _2\"></span>s are based on information and estimates de<span class=\"_ _e\"></span>emed b<span class=\"_ _2\"></span>y the g<span class=\"_ _e\"></span>roup to be the most appropriate as of today. If the e<span class=\"_ _2\"></span>ffect of the time value of money is material, provisions are discounted using a current pre-tax rate that reflec<span class=\"_ _e\"></span>ts, when appropriate, the risks specific to the liability. <span class=\"_ _2\"></span>When discounting is used, the increase in the provision due to the passage of time is re<span class=\"_ _e\"></span>cognised as a finance co<span class=\"_ _2\"></span>st.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForProvisionsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__193": {
   "value": "3.3.14 <span class=\"_ _1dd\"> </span>Trade and other payables Trade and<span class=\"_ _2\"></span> other payables are stated at amortised cost.<span class=\"_ _e\"></span> Levies<span class=\"fc1b\"> </span>In its role<span class=\"_ _2\"></span> as a TSO, Elia Transmission Belgium SA/NV an<span class=\"_ _e\"></span>d 50Hertz Transmission<span class=\"_ _2\"></span> GmbH are<span class=\"_ _e\"></span> subject to various public service obligation<span class=\"_ _2\"></span>s imposed by the Government and/or by regulation<span class=\"_ _e\"></span> mechanisms. These identify public service obligations in various fields (such as promoting the u<span class=\"_ _2\"></span>se of renewable energy, social s<span class=\"_ _e\"></span>upport, fees for the use of the <span class=\"ls5b\">pu</span>blic domain, offshore liab<span class=\"_ _e\"></span>ility) for fulfilment by TSOs. The<span class=\"_ _2\"></span> costs incurred by TSOs in accordance with th<span class=\"_ _e\"></span>ese obligations are fully co<span class=\"_ _2\"></span>vered by the tariff <span class=\"_ _e\"></span><span class=\"ff42\">\u2018</span>levies<span class=\"ff42\">\u2019</span> approved by the regulator. The amoun<span class=\"_ _2\"></span>ts outstanding (surplus) are reported as a tr<span class=\"_ _e\"></span>ade and other payable.  In this process<span class=\"ls1d\">, </span>as <span class=\"ff42\">the TSO\u2019s </span>are <span class=\"ls5b\">agent</span>s<span class=\"_ _e\"></span>, the group opted for a net presentation both at profit or loss and at ba<span class=\"_ _2\"></span>lanc<span class=\"_ _e\"></span>e sheet level.  These transact<span class=\"_ _2\"></span>ions are fully \u201cpassed through\u201d.<span class=\"ff3f\"> </span>See also Note<span class=\"_ _2\"></span> 9.1.14.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForTradeAndOtherPayablesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__194": {
   "value": "Govern<span class=\"_ _e\"></span>ment grants  Government gran<span class=\"_ _2\"></span>ts are recognised when it is reasonably <span class=\"_ _e\"></span>certain that the group will receive such grants and that all underlying conditions will b<span class=\"_ _2\"></span>e met. Grants related to an asset are pres<span class=\"_ _e\"></span>ented under other liabilities and will be recognised in the <span class=\"_ _e\"></span>statement of profit or loss on a systematic <span class=\"_ _2\"></span>basis over the expected useful life of the asset in question. Grants related to expense items ar<span class=\"_ _e\"></span>e recognised in<span class=\"_ _2\"></span> the statement of <span class=\"_ _2\"></span>profit or loss in the same period as the expe<span class=\"_ _e\"></span>nses for which the<span class=\"_ _2\"></span> grant was received. Government grants are presented as other operating in<span class=\"_ _2\"></span>come in the statement of profit or loss.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForGovernmentGrants",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__195": {
   "value": "Contract liabilities <span class=\"_ _e\"></span><span class=\"ff43\">\u2013</span> last mile connection The consider<span class=\"_ _2\"></span>ation of the last mile connection is paid upfro<span class=\"_ _e\"></span>nt, whilst the<span class=\"_ _2\"></span> rev<span class=\"_ _e\"></span>enues are recognised over the lifetime of <span class=\"_ _e\"></span>the underlying asset. The amounts to be relea<span class=\"_ _2\"></span>sed in future are reflected <span class=\"_ _e\"></span>in this section<span class=\"_ _2\"></span>. See also No<span class=\"_ _e\"></span>te 3.4.1.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfOtherAccountingPoliciesRelevantToUnderstandingOfFinancialStatements",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__196": {
   "value": "3.3.16 <span class=\"_ _1dd\"> </span>Leases Upon the<span class=\"_ _2\"></span> inception of a contract, the gr<span class=\"_ _e\"></span>oup assesses whether a<span class=\"_ _2\"></span> contract is, or contains, a lease. A contract is, or contains, a lease if the contract<span class=\"_ _2\"></span> conveys the right to control the use of an identified asset for a period of time in exchange for consideration. To assess<span class=\"_ _e\"></span> whether a contract con<span class=\"_ _2\"></span>veys the right to control the use of an identi<span class=\"_ _e\"></span>fied asset, the group uses the definition of a lease included in IFRS 16. The group as a lessee The group<span class=\"_ _2\"></span> recognises a right<span class=\"_ _e\"></span>-<span class=\"ls5b\">of</span>-use asset and a lease liability <span class=\"ls5b\">on </span>the lease commencement date. Assets and liabilities arising from a lease are initially m<span class=\"_ _2\"></span>easured on a present value basis<span class=\"_ _e\"></span> <span class=\"ls5b\">and</span> discounted using the group's best estimate for the weighted average incremental borro<span class=\"_ _2\"></span>wing rate, in case the rate implicit in the <span class=\"_ _e\"></span>lease cannot be readily determined<span class=\"ls1d\">. </span>The group applies a <span class=\"_ _e\"></span>single discount rate per group of similar<span class=\"_ _2\"></span> contracts, su<span class=\"_ _e\"></span>mmarised per the<span class=\"_ _2\"></span>ir durat<span class=\"_ _e\"></span>ion.  Lease payments included in the measuremen<span class=\"_ _2\"></span>t of the lease<span class=\"_ _e\"></span> liability comprise fixed payments, including in-substance fixed payments. Variable lea<span class=\"_ _2\"></span>se payments are expensed as incurred. As <span class=\"ls5b\">a <span class=\"_ _e\"></span></span>practical expedient, no distinction is made between lease and non<span class=\"_ _e\"></span>-lease components.<span class=\"fs11\"> </span>Comp<span class=\"_ _2\"></span>onents that do not transfer any goods <span class=\"_ _e\"></span>or services (initial direct costs, prepayments) are excluded from the lease price. Right of use assets are subsequently reduced by a<span class=\"_ _2\"></span>ccumul<span class=\"_ _e\"></span>ated depre<span class=\"_ _2\"></span>ciation, impairment losses and any adjustment<span class=\"_ _e\"></span>s resulting<span class=\"_ _2\"></span> from the remea<span class=\"_ _2\"></span>surement of the lease liability. <span class=\"_ _e\"></span>These assets are depreciated using the straight-line method from the commencement date to the end of <span class=\"_ _2\"></span>the lease term, unless the lease transfers ownership <span class=\"_ _e\"></span>of the underlying asset to the group by the end of the lease term or the cost of the right-<span class=\"ls5b\">of</span>-use asset reflects the fact that the group will exercise a purchase option. In that case the right-<span class=\"ls5b\">of</span>-use asset will b<span class=\"ls5b\">e </span>depre<span class=\"_ _2\"></span>ciated over the useful life of the underlying asset, which is determined on the same basis as that of property <span class=\"_ _e\"></span>and equipment. The lea<span class=\"_ _2\"></span>se liability is subsequently increased by the interest cost on the lease liability and reduced by lease payment<span class=\"_ _e\"></span>s made. It is remea<span class=\"_ _2\"></span>sured when there is a change in future lease payments arising from a change in an index or rate, a change in the e<span class=\"_ _2\"></span>stimat<span class=\"_ _e\"></span>e of the amoun<span class=\"_ _2\"></span>t expected to be payable under a residual value guarantee, or a change in the reassessment of whether a purc<span class=\"_ _e\"></span>hase or extension option is reasonably certain t<span class=\"_ _2\"></span>o be exercised or a termination option not to be exercised.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> presents right-<span class=\"ls5b\">of<span class=\"_ _e\"></span></span>-<span class=\"ff42\">use assets within \u2018property, plant and equ<span class=\"_ _2\"></span>ipment\u2019 and lease liabilities within \u2018loans and borrowings\u2019 (current </span>and non-curren<span class=\"_ _2\"></span>t) in the statement of financial position.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> has elected not to recognise right-<span class=\"ls5b\">of<span class=\"_ _e\"></span></span>-use assets and lease liabilities for leases of low-value assets and s<span class=\"_ _e\"></span>hort-term leases, including IT eq<span class=\"_ _2\"></span>uipment. The group recognises the lease payments associated with these leases as an expense on a straight-line basis over the lease<span class=\"_ _2\"></span> term. The group as a lessorLeases that sub<span class=\"_ _2\"></span>stantially transfer all the risks and rewards incidental to ownership of an underlying asset are recognised as<span class=\"_ _e\"></span> finance leases. All other lea<span class=\"_ _2\"></span>ses that do not transfer all such <span class=\"_ _e\"></span>risks and rewards are recognised as operating leases. As a lessor, the <span class=\"_ _e\"></span>group has only opera<span class=\"_ _2\"></span>ting lease contracts. The lease payments received <span class=\"_ _e\"></span>are recognised as other income on a straight-line basis over the lease term.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForLeasesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__197": {
   "value": "3.3.17 <span class=\"_ _24f\"> </span>Regulatory deferral accounts The group<span class=\"_ _2\"></span> operates in a regulated environment in which tariffs are meant to realise total revenue/income consisting of:<span class=\"_ _20\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">a re<span class=\"_ _2\"></span>asonable return on invested capital; </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">all rea<span class=\"_ _2\"></span>sonable costs which are incurred by the group.<span class=\"_ _e\"></span> </span></span>Since the tariffs are ba<span class=\"_ _2\"></span>sed on estimates, there is always a difference between the tariffs that are actually charged and the t<span class=\"_ _e\"></span>ariffs that should ha<span class=\"_ _2\"></span>ve been charged (tariff setting agreed with regul<span class=\"_ _e\"></span>ator) to cover all reasonable costs of the system operator including <span class=\"ls5b\">a </span>reasonable profit marg<span class=\"_ _2\"></span>in for its shareholders.<span class=\"_ _e\"></span> If the applied tariffs <span class=\"_ _2\"></span>result in a surplus or a deficit at the end of the year, this means that the tariffs charged to <span class=\"_ _e\"></span>end consumers should have been lower or<span class=\"_ _2\"></span> higher respectively (<span class=\"_ _e\"></span>and vice versa). This surplus or deficit is therefore reported in the regulatory deferral account.  The release<span class=\"_ _2\"></span> of the regulatory deferral account will impact future tariffs: i<span class=\"_ _e\"></span>ncurred regulatory liabilities will de<span class=\"_ _2\"></span>crease fu<span class=\"_ _e\"></span>ture tariffs, whilst incurred regulato<span class=\"_ _2\"></span>ry assets will increase future tariffs.<span class=\"_ _e\"></span> In the absence of an IF<span class=\"_ _2\"></span>RS standard which specifically applyies<span class=\"_ _e\"></span> to the treatment <span class=\"ls5b\">of</span> these regulatory deferral accounts, Elia manageme<span class=\"_ _e\"></span>nt referred to the<span class=\"_ _2\"></span> requirements of IFRS 14 and the Conceptual Framework for Financial Reporting al<span class=\"_ _e\"></span>ongside the lates<span class=\"_ _e\"></span>t change<span class=\"_ _2\"></span>s in the IASB project on Ra<span class=\"_ _2\"></span>te-regulated Activities to develop the following accounting policy: <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">a liability is re<span class=\"_ _2\"></span>cognised in the statement of financial position and presented as part of <span class=\"_ _e\"></span><span class=\"ff42\">\u201caccruals and deferred income\u201d</span> with respect </span></span>to the Elia g<span class=\"ff42\">roup\u2019s obligation</span> to deduct an amount from the tariffs <span class=\"_ _2\"></span>to be charged to customers in future periods because the total allowed compensa<span class=\"_ _2\"></span>tion for goods or services already supplied is lower than the amount already charged to customers<span class=\"_ _e\"></span>, or excess revenues has been<span class=\"_ _2\"></span> generated due to higher v<span class=\"_ _e\"></span>olumes than initially estimated (regulatory liability);  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">an a<span class=\"_ _2\"></span>sset is recognised in the statement of financial position w<span class=\"_ _e\"></span>ith respect to the Elia g<span class=\"ff42\">roup\u2019s</span> right to add an amount to the tariffs to </span></span>be charged to customer<span class=\"_ _2\"></span>s in future periods because the total allowed compensation for the goods or services already supplied exceeds the amount already cha<span class=\"_ _2\"></span>rged to customers <span class=\"_ _e\"></span>or shortage in revenues has occurred due to lower volumes than initially estimated (regulatory asse<span class=\"_ _2\"></span>t); and<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the n<span class=\"_ _2\"></span>et movement in the regulatory deferral accounts for the period is presented separately in the statement of profit or loss within<span class=\"_ _e\"></span> </span></span>the line item <span class=\"ff42\">\u201cnet regulatory income (e<span class=\"_ _2\"></span>xpense)\u201d.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>The amoun<span class=\"_ _2\"></span>t in the regulatory deferral accounts is rep<span class=\"_ _e\"></span>orted on an annual basis and assessed by the regulator. The <span class=\"_ _1\"></span>s<span class=\"_ _e\"></span>um <span class=\"_ _4b\"></span>of <span class=\"_ _2\"></span>revenue <span class=\"_ _1\"></span>f<span class=\"_ _e\"></span>rom <span class=\"_ _4b\"></span>contracts <span class=\"_ _4b\"></span>with <span class=\"_ _4b\"></span>cus<span class=\"_ _e\"></span>tomers <span class=\"_ _4b\"></span>(<span class=\"_ _e\"></span>as <span class=\"_ _1\"></span>d<span class=\"_ _e\"></span>efi<span class=\"_ _e\"></span>ned <span class=\"_ _1\"></span>in<span class=\"_ _e\"></span> <span class=\"_ _4b\"></span>IFRS <span class=\"_ _2\"></span>15), <span class=\"_ _4b\"></span>other <span class=\"_ _4b\"></span>income <span class=\"_ _4b\"></span>an<span class=\"_ _e\"></span>d <span class=\"_ _4b\"></span>the <span class=\"_ _4b\"></span>n<span class=\"_ _e\"></span>et <span class=\"_ _4b\"></span>income <span class=\"_ _4b\"></span>(expens<span class=\"_ _e\"></span>e) <span class=\"_ _4b\"></span>from <span class=\"_ _2\"></span>the <span class=\"_ _4b\"></span>settlement mechan<span class=\"_ _2\"></span>ism <span class=\"_ _e\"></span>is <span class=\"_ _e\"></span>also p<span class=\"_ _e\"></span>resented as <span class=\"_ _e\"></span>a subt<span class=\"_ _e\"></span>otal he<span class=\"_ _e\"></span>aded <span class=\"_ _e\"></span><span class=\"ff42\">\u201c</span>Revenue, other i<span class=\"_ _e\"></span>ncome <span class=\"_ _e\"></span>and <span class=\"_ _e\"></span>net inco<span class=\"_ _e\"></span>me (expense) <span class=\"_ _e\"></span>from settl<span class=\"_ _e\"></span>ement m<span class=\"_ _e\"></span>echanism<span class=\"ff42\">\u201d</span><span class=\"ls1d\">, <span class=\"_ _e\"></span></span>as in <span class=\"_ _20\"></span>substance <span class=\"_ _e\"></span>it<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>represents <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>rev<span class=\"_ _e\"></span>enue <span class=\"_ _20\"></span>that <span class=\"_ _20\"></span>is <span class=\"_ _e\"></span>ec<span class=\"_ _e\"></span>onomically <span class=\"_ _20\"></span>earned <span class=\"_ _20\"></span>during <span class=\"_ _20\"></span>the <span class=\"_ _e\"></span>pe<span class=\"_ _e\"></span>riod <span class=\"_ _20\"></span>taking <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>nto <span class=\"_ _20\"></span>account <span class=\"_ _20\"></span>the <span class=\"_ _20\"></span>regulated<span class=\"_ _20\"></span> <span class=\"_ _20\"></span>environment <span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>n which the Elia group operates<span class=\"ls1d\">. </span>The effect of discounting is reflected in the financia<span class=\"_ _2\"></span>l result. <span class=\"_ _e\"></span>See Note 9.  3.4 <span class=\"_ _24d\"></span>Items in the statement of profit or loss3.4.1 <span class=\"_ _36\"> </span>Inco<span class=\"_ _e\"></span>me Revenu<span class=\"_ _e\"></span>es IFRS 15 est<span class=\"_ _2\"></span>ablishes a five-step model to account for <span class=\"_ _e\"></span>revenue arising from contracts <span class=\"_ _2\"></span>with customers and requires that revenue be recogn<span class=\"_ _2\"></span>ised at an amount that reflects the consideration to which an entity expects to be entitled in exchange for transferring goods or services to a customer. The<span class=\"_ _2\"></span>se are the five steps to consider for each customer contract: 1.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Identifing the contract(s) with a customer; </span></span>2.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Identifing the performance obligations in the contract(s); </span></span>3.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Determining the transaction price; </span></span>4.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Allocating the transaction price to the performance obligations; </span></span>5.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Recognising revenue when performance obligations are satisfied, or when control of goods or services is transferred to the </span></span>customer. The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s main revenues <span class=\"ff3f\">are realised by TSOs which o<span class=\"_ _e\"></span>perate in accordan<span class=\"_ _2\"></span>ce with r<span class=\"_ _e\"></span>egulatory frameworks and which have de </span></span>facto/lega<span class=\"_ _2\"></span>l monopolies in their respective control zones. T<span class=\"_ _e\"></span>he framewor<span class=\"_ _2\"></span>ks w<span class=\"_ _e\"></span>hich apply in the g<span class=\"ff42\">roup\u2019s </span>main countries of activity are detailed in<span class=\"_ _2\"></span> Note 9 <span class=\"ff42\">\u2018</span>Regulatory framework and tariffs<span class=\"ff42\">\u2019<span class=\"ff45\">.<span class=\"_ _e\"></span></span></span> With regard to the regulated bu<span class=\"_ _2\"></span>siness, each service is based on a standard contract with the customer, mostly with<span class=\"_ _e\"></span> a predefined regulated tariff (<span class=\"_ _2\"></span>unit price multiplied by th<span class=\"_ _e\"></span>e volume (injection or<span class=\"_ _2\"></span> offtake) or the reserved capacity (depending on the type of service)<span class=\"_ _e\"></span>), so pricing is not var<span class=\"_ _2\"></span>iable. The allocation of the transaction pri<span class=\"_ _e\"></span>ce over the different performance obligations is therefore <span class=\"_ _e\"></span>straightforward (one-to<span class=\"ls0\">-one relationship). Most of these con<span class=\"_ _2\"></span>tracts <span class=\"_ _e\"></span>are concluded for an indefinite period and have general payment terms of <span class=\"ls5b\">15</span>-30 days.<span class=\"_ _e\"></span> </span>Considerin<span class=\"_ _2\"></span>g the business of the Elia <span class=\"_ _e\"></span>group, there are no relevant right-<span class=\"ls78\">of<span class=\"_ _2\"></span><span class=\"ls0\">-return and warranty obligations. </span></span>For a<span class=\"_ _2\"></span>ll services provided by the group, Elia is the sole an<span class=\"_ _e\"></span>d primary party responsible for executing the service and is thus the principal. <span class=\"_ _e\"></span> However, in<span class=\"_ _2\"></span> its role as a TSO, Elia <span class=\"_ _e\"></span>Transmission Belgium SA/NV and 50Hertz Transmission GmbH are subject to public service obligation<span class=\"_ _2\"></span>s imposed by the government/regulation mechanisms. These oblig<span class=\"_ _e\"></span>ations mainly relate to financial support for the development of renewable ener<span class=\"_ _2\"></span>gy. TSOs act as agents for these activities, and since the expense/income streams are fully covered by tariffs, t<span class=\"_ _e\"></span>hey have no<span class=\"_ _2\"></span> impact on the statement of profit and loss. See section <span class=\"ff42\">\u2018</span>Levies<span class=\"ff42\">\u2019</span> of Note 3.3.14 for more information on the accounting treatment. The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s main performance obligations/contract types, their pricing and the rev<span class=\"ff3f\">e<span class=\"_ _e\"></span>nue recognition method for 2022 can be summarised </span></span>as follows: Revenue <span class=\"_ _e\"></span>by category for Elia Tran<span class=\"_ _2\"></span>smission Belgium Revenue stream Nature, customer and timing of satisfaction of performance o<span class=\"_ _2\"></span>bligations<span class=\"_ _e\"></span> Contract <span class=\"ff43\">\u2013</span> Price setting Grid revenues Technical studies<span class=\"ff3f\"> conducted at the request of grid users, connected directly to the </span>Contract and tariff approved by grid with a view to having a new connection built or an existing connection alt<span class=\"_ _2\"></span>ered. <span class=\"_ _20\"></span> regulator. The revenue is recognised at the point in time when the study is delivered. Fixed amount per type of study. Last-<span class=\"_ _e\"></span>mile conn<span class=\"_ _2\"></span>ection <span class=\"ff3f\">is a component of the grid connection contract. At the requ<span class=\"_ _2\"></span>est </span>Standard contract approved by of a future grid user, Elia constructs/adjusts a dedicated/ physical <span class=\"_ _2\"></span>connection, known regulator, but the price is set on as a last-mile connection, to connect the customer<span class=\"ff42\">\u2019s fac<span class=\"_ _e\"></span>ility to Eli<span class=\"_ _2\"></span>a\u2019s grid. Although </span>the basis of the budget for control of the asset is not transferred as such to the grid user, the <span class=\"_ _2\"></span>grid user obtains imple<span class=\"_ _e\"></span>menting the c<span class=\"_ _2\"></span>onnection. direct access to the high-vol<span class=\"_ _e\"></span>tage grid. The a<span class=\"_ _2\"></span>ccess right transferred by Elia is valuable to the grid user, hence why the grid user compensates Elia in cash. <span class=\"ff40\"> </span>Since the grid user simultaneously enters into a grid connectio<span class=\"_ _2\"></span>n contract, the t<span class=\"_ _e\"></span>w<span class=\"_ _2\"></span>o Grid connection activities (access right and grid connection services) are not distin<span class=\"_ _2\"></span>ct and constitute a single performance obli<span class=\"_ _e\"></span>gation and int<span class=\"_ _2\"></span>erdependence between the contracts. As the total amount of revenue recognised for this single performa<span class=\"_ _2\"></span>nce obligation, which includes grid connection services, is recognised over the life of the assets, the contract has no specific end date.  This component of the grid connection/grid user contract is presented separately  <span class=\"_ _2\"></span> (not part of the grid connection/revenues from the revenue cap) because the tariff<span class=\"_ _e\"></span>-setting method is very specific from a regulatory perspective. The fees charged to grid users/distribution sys<span class=\"_ _e\"></span>tem operators (DSO<span class=\"_ _2\"></span>s) cover the Contract and tariff approved by maintenance and operating<span class=\"ff3f\"> costs relating to the</span> de<span class=\"_ _e\"></span>dicated con<span class=\"_ _2\"></span>nection facilities. regulator. The revenue is recognised over time, as this service is performed continuously Tariff is set per asset type (e.g. throughout the contractual term. bay, km of cable). This component of the access contract signed with access holders/DSOs covers the Contract and tariff approved by development and management of the grid with a view to meeting capacity needs and regulator. Management and satisfying demand for electricity transmission.  EUR per kW/KVA for development of grid The revenue is recognised over time, as providing sufficient capacity and a resilient yearly/monthly peak and power infrastructure grid is a service performed continuously throughout the contractual term. available at access point. This component of the access contract signed with access holders/DSOs covers the Contract and tariff approved by mana<span class=\"_ _e\"></span>g<span class=\"_ _2\"></span>ement and operation of the electricity system and the offtak<span class=\"_ _2\"></span>e of additional regulator. Management of the reactive energy relat<span class=\"ls9d\">in<span class=\"_ _e\"></span></span>g <span class=\"ff42\">to Elia<span class=\"_ _e\"></span>\u2019s grid (different from the <span class=\"_ _2\"></span>connection assets).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>EUR per kW/ kVArh at access electricity system<span class=\"ff3f\"> </span>The revenue is recognised over time, as these services are performed continuously point.  throughout the contractual term. This component is part of the access contract signed with access <span class=\"_ _2\"></span>holders/DSOs, and Contract and tariff approved by covers (i) services to facilitate the energy market; (ii) services to <span class=\"_ _2\"></span>develop and regulator. enhance the integration of an effective and efficient electricity market;<span class=\"_ _e\"></span> (iii) the EUR per kW at access point. mana<span class=\"_ _e\"></span>g<span class=\"_ _2\"></span>ement of interconnectors and coordination with neighbouring countries and the European authorities; and (iv) the publication of data, as requir<span class=\"_ _2\"></span>ed by transparency Market integration obligations. The revenue is recognised over time,<span class=\"_ _e\"></span> as these services are <span class=\"_ _2\"></span>performed continuously throughout the contractual term. As defined in the BRP contract, the BRP<span class=\"_ _2\"></span> (Balance <span class=\"_ _e\"></span>Responsible Party) has a Contract and tariff/mechanism commitment to ensure a perfect balance between offtake and injection on the grid. In approved by regulator. Compensation for the event of an imbalance caused by a BRP, Elia has to activate the ancillary Based on market prices, EUR per imbalances services, <span class=\"_ _e\"></span>which are then invoiced t<span class=\"_ _2\"></span>o the <span class=\"_ _e\"></span>BRP. kW imbalance at access point. The revenue is recognised at the point in time when an imbalance<span class=\"_ _2\"></span> occurs.<span class=\"_ _e\"></span> Grid use along borders is organised through half<span class=\"_ _e\"></span>-yearly, quarterly,<span class=\"_ _2\"></span> monthly, weekly, Framework agreement with parties weekend, daily and intra-day auctions. Elia and the regulators decide which auctions and auction office. are conducted alon<span class=\"_ _e\"></span>g each border. Aucti<span class=\"_ _2\"></span>ons are organised through an auction office, Price is set based on price International revenues which acts as an agent. The auction office collects the revenues <span class=\"_ _2\"></span>paid by the difference in cross-border <span class=\"_ _e\"></span>mar<span class=\"_ _2\"></span>ket European energy traders, which are ultimately<span class=\"_ _e\"></span> shared between ne<span class=\"_ _2\"></span>ighbouring TSOs prices.  based on the volumes imported/exported on the border. The revenue is recognised at the point in time when an <span class=\"_ _e\"></span>import/exp<span class=\"_ _2\"></span>ort activity occurs. Revenue <span class=\"_ _e\"></span>by categor<span class=\"_ _2\"></span>y for 50 Hertz Transmission  Revenue stream Nature and timing of satisfaction of performance obligations Contract <span class=\"ff43\">\u2013</span> Price setting Grid revenues The \u2018grid use fee\u2019 is charged to grid users/DSOs connected to the <span class=\"_ _2\"></span>grid for the Standard contract and grid tariffs volume of injection and/or offtake on the onshore grid. This contract is signed with defined by regulator. grid users.  The revenue is recognised over time, as this service is a performed continuousl<span class=\"ls83\">y </span>throughout the contractual term. Revenues from incentive Last-<span class=\"_ _e\"></span>mile conn<span class=\"_ _2\"></span>ection <span class=\"ff42\">is a component of the \u2018grid use fee\u2019 contract. At the request </span>Standard contract approved by regulation<span class=\"ff3f\"> </span>of a future grid user, 50Hertz constructs a dedicated/physical connection, known as regulator, but the price is set on a last-mile connection, to create an interface point to the grid. Although control of the basis of the budget for the asset is not transferred as such to the grid user, the grid user obtains dire<span class=\"_ _2\"></span>ct imple<span class=\"_ _e\"></span>menting the c<span class=\"_ _2\"></span>onnection. access to the high-vo<span class=\"_ _e\"></span>ltage grid. Th<span class=\"_ _2\"></span>e access right<span class=\"_ _e\"></span> transferred by 50Hertz is valuable to the grid user, hence why the grid user compensates Elia in cash. <span class=\"ff40\"> </span>Since the grid user simultaneously enters into a grid connectio<span class=\"_ _2\"></span>n contract, the t<span class=\"_ _e\"></span>w<span class=\"_ _2\"></span>o activities (access right and grid connection services) are not d<span class=\"_ _e\"></span>istin<span class=\"_ _2\"></span>ct and constitute a single performance obligation and interdependence between the contr<span class=\"_ _2\"></span>acts.<span class=\"_ _e\"></span> As the total amount of revenue recognised for this single performa<span class=\"_ _2\"></span>nce obligation, which includes grid connection services, is recognised over the life of the <span class=\"_ _e\"></span>assets, the contract has no specific end date.  This component of the grid connection/grid user contract is presented separately (not part of the grid connection/revenues from the revenue cap) because the tariff<span class=\"_ _e\"></span>-setting method is very specific from a regula<span class=\"_ _e\"></span>tory perspective. This component comprises tariffs charged to grid users/DSOs to c<span class=\"_ _2\"></span>over grid Contract and tariffs predefined in Revenues from offshore connection costs for offshore wind farms.  regulatory mechanism. regulation The revenue is recognised over time, as this service is performed continuously throughout the contractual term  This revenue stream consists of different components  Cong<span class=\"_ _2\"></span>esti<span class=\"_ _e\"></span>on management and redispatch <span class=\"ff3f\">fees are paid by market participants for </span>Standard contracts approved by use of the capacity made available by 50Hertz on specific lines (i<span class=\"_ _2\"></span>ncluding use of regulator and tariff mechanism cross-border assets). This allocation mechanism is governed by tr<span class=\"_ _2\"></span>ansparent, defined in regulatory schemes.  market-or<span class=\"_ _e\"></span>iented pr<span class=\"_ _2\"></span>ocedures.  The revenue is recognised at the point in ti<span class=\"_ _e\"></span>me when it is g<span class=\"_ _2\"></span>enerated<span class=\"ff40\"> </span>Compensation for imbalances<span class=\"_ _e\"></span><span class=\"ff3f\">  </span>Market participants (BRPs) have a commitment to ensure a perfect balance Standard contracts approved by Energy revenues between offtake and injection on the grid. In the event of an imbalance, 50Hertz regulator and tariff mechanism invoices the market participant to compensa<span class=\"_ _e\"></span>te for the cost<span class=\"_ _2\"></span>s incurred. defined in regulatory schemes.  The revenue is recognised at the point in time when an <span class=\"_ _e\"></span>imbalance<span class=\"_ _2\"></span> occurs. Horizontal reimbursement of lignite back-up costs In its role as a TSO, 50Hertz charges fees to other TSOs for servi<span class=\"_ _2\"></span>ces related to the  reserve power re<span class=\"_ _e\"></span>quired by t<span class=\"_ _2\"></span>he legal framework. The revenue is recognised over time, as this service is performed continuously throughout the contractual term. Other rev<span class=\"_ _e\"></span>enues Revenue stream Nature and timing of satisfaction of performance obligations Contract <span class=\"ff43\">\u2013</span> Price setting Other revenues Elia Grid International provides consultancy services to third parties around the Contract negotiated between E<span class=\"ls102\">GI</span> world.  and customer. The revenue is recognised over the comp<span class=\"_ _e\"></span>letion of the contract.  The contract price is set when the Third-party services contract is concluded with the Third-party services are presented in other revenues. customer. The payment term is generally 30 days from the invoice date. Re.alto provides a platform throu<span class=\"_ _e\"></span>gh which energy actors (e.g. tra<span class=\"_ _2\"></span>ders, prosumers) The commission fee is a fixed can exchange energy data. re.alto receives a commission on transactions percentage on each transaction. undertaken via the platform. Commission fee The revenue is recognised at the point in t<span class=\"_ _e\"></span>ime when t<span class=\"_ _2\"></span>he transaction occurs. The commission fee is presented in other revenues. This mainly covers other services than those described above.  Others<span class=\"ff3f\"> </span>The revenue is recognised at the point in time when the service is complete. Consequently, all revenue com<span class=\"_ _2\"></span>ponents contain revenue from contracts with customers, i.e. parties that have contract<span class=\"_ _20\"></span>s in p<span class=\"_ _2\"></span>lace with the Group <span class=\"_ _2\"></span>to obtain services resulting from the Group<span class=\"ff42\">\u2019s o<span class=\"_ _e\"></span>rdinary activities in exchange for </span><span class=\"ls5b\">a </span>consideration. Other in<span class=\"_ _e\"></span>come  Other in<span class=\"_ _2\"></span>come is recognised when the related service is p<span class=\"_ _e\"></span>erformed and no further performance obligations arise<span class=\"fc1d\">. </span>Net r<span class=\"_ _e\"></span>egulatory<span class=\"_ _2\"></span> income (expense) from <span class=\"_ _e\"></span>settleme<span class=\"_ _2\"></span>nt mech<span class=\"_ _e\"></span>anism Since the tariffs are based on estimates, there is a<span class=\"_ _2\"></span>lways a<span class=\"_ _e\"></span> difference be<span class=\"_ _2\"></span>tween the tariffs that are actually charged and the tariffs that should ha<span class=\"_ _2\"></span>ve been charged (tariff setting is ag<span class=\"_ _e\"></span>reed with the <span class=\"ff42\">regulator) to cover all the system operator\u2019s reasonab<span class=\"_ _2\"></span>le <span class=\"_ _e\"></span>costs, <span class=\"ff3f\">including a </span></span>reasonable profit marg<span class=\"_ _2\"></span>in for the shareholders.<span class=\"_ _e\"></span> If the applied tariffs <span class=\"_ _2\"></span>result in a surplus or deficit at the end of the year, this means that the tariffs charged to consumer<span class=\"_ _e\"></span>s/the general public could<span class=\"_ _2\"></span> have been lower or higher. This surplus or de<span class=\"_ _e\"></span>ficit is therefore reported in the settlement mechanism deferra<span class=\"_ _2\"></span>l account. <span class=\"_ _20\"></span> The release<span class=\"_ _2\"></span> of this deferral account will impact future tariffs: where regulatory liabilities are incurred, future tariffs wi<span class=\"_ _e\"></span>ll be lower, and where regula<span class=\"_ _2\"></span>tory assets are incurred, future ta<span class=\"_ _e\"></span>riffs will be higher. The<span class=\"_ _2\"></span> net movement in the regulatory deferral accounts for the period is presen<span class=\"_ _2\"></span>ted separately in the statement of profit or loss <span class=\"ls1c\">in</span> the line 'Net income (expense) from settlement mechanism'. See also Note 3.3.17. <span class=\"fs11\"> </span>3.4.2 <span class=\"_ _36\"> </span>Expenses Other <span class=\"_ _e\"></span>expenses Property taxes are d<span class=\"_ _2\"></span>irectly recognised in full as soon as o<span class=\"_ _e\"></span>wnership is certain (generally on 1 January of the year in question). However, these cost<span class=\"_ _2\"></span>s, which are considered to be <span class=\"ls5b\">non<span class=\"_ _e\"></span></span>-controllable costs under the regulatory framework, are recorded as revenue through the settlement me<span class=\"_ _2\"></span>chanism for the same amount, resulting in zero imp<span class=\"_ _e\"></span>act in terms of profit or loss. Finance income and expensesFinance<span class=\"_ _2\"></span> expenses comprise interest payable on <span class=\"_ _e\"></span>borrowings (calculated using the effective interest rate method)<span class=\"ls1d\">, </span>in<span class=\"_ _e\"></span>terest on lease liabilities, fore<span class=\"_ _2\"></span>ign-exchange losses, gains on currency hed<span class=\"_ _e\"></span>ging instruments that offset currency losses, results on interest-rate hedging instruments, losse<span class=\"_ _2\"></span>s on hedging instruments that are not part of a hedge accounting relationship, losses on financial assets classified as being for trading purposes and imp<span class=\"_ _2\"></span>airment losses on financial assets as well as any losses from hedge ineffectiveness. <span class=\"_ _e\"></span> Finance<span class=\"_ _2\"></span> income includes interest receivables on bank deposits, which a<span class=\"_ _e\"></span>re recognised in profit or loss using the effective interest rate method as the<span class=\"_ _2\"></span>y accrue.<span class=\"_ _e\"></span> Borrowing c<span class=\"_ _2\"></span>osts that are not directly attributable to the acquisition, construction or production of a qualifying asset <span class=\"_ _e\"></span>are re<span class=\"_ _2\"></span>cognised in profit or loss using the<span class=\"_ _2\"></span> effective interest method.<span class=\"_ _e\"></span> Inco<span class=\"_ _e\"></span>me taxes<span class=\"_ _2\"></span> Income taxes comprise<span class=\"_ _2\"></span> current and deferred tax. Income <span class=\"_ _e\"></span>tax expense is recognised in profit or loss, except where it relates to items recogn<span class=\"_ _2\"></span>ised directly in equity. Taxes on hybrid coupons are recognised in the statement of profit and loss as these <span class=\"_ _e\"></span>are a tax on profits whereas <span class=\"_ _2\"></span>the hybrid coupon itself is recognised directly i<span class=\"_ _e\"></span>n equity. Curren<span class=\"_ _2\"></span>t tax is the expected tax payable on taxable income for the year, using tax rates enacted or substantively enacted at the end of the reporting period, and a<span class=\"_ _2\"></span>ny adjustments to tax payable in relation to previous years. Deferred tax <span class=\"_ _2\"></span>is recognised, using the balance she<span class=\"_ _e\"></span>et method, on temporary differences arising between the carrying<span class=\"_ _e\"></span> amounts of assets and liabilities for fin<span class=\"_ _2\"></span>ancial reporting purposes and the amounts used for taxation purposes. Deferred tax is not recognised for<span class=\"_ _e\"></span> the following tempor<span class=\"_ _2\"></span>ary differences: the initial recognition of assets or liabilities in a transaction that is not a business c<span class=\"_ _e\"></span>ombination and that affects ne<span class=\"_ _2\"></span>ither accounting nor taxable profit<span class=\"ls1d\">; </span>a<span class=\"_ _e\"></span>nd differences relating to investments in sub<span class=\"_ _2\"></span>sidiaries and joint ventur<span class=\"_ _e\"></span>es where these will probably <span class=\"ls5b\">not</span> <span class=\"ls5b\">be</span> reversed in the foreseeable future. In addition, deferred tax is not recognised for taxable temporary differences arising from initia<span class=\"_ _2\"></span>l recognition of goodwill. Deferred tax is measured at the tax rates that are expected to be applied to the tempor<span class=\"_ _e\"></span>ary differences when the<span class=\"_ _2\"></span>y are reversed, based on the laws that have been enacted or substantively enacted by the reporting date. Deferred tax assets and liabilities are o<span class=\"_ _2\"></span>ffset if there is a legally enforceable right to offset current tax liabilities and assets and the <span class=\"_ _e\"></span>deferred items relate to income ta<span class=\"_ _2\"></span>xes levied by the same tax authority on the same taxable entity or on different tax entities, but they a<span class=\"_ _e\"></span>re intend<span class=\"ls5b\">ed</span> to settle curren<span class=\"_ _2\"></span>t tax liabilities and assets on a net basis, or th<span class=\"_ _e\"></span>eir tax assets and liabilities will be<span class=\"_ _2\"></span> realised si<span class=\"_ _e\"></span>multaneously. A deferred ta<span class=\"_ _2\"></span>x asset is recognised only to the extent that it is likely that future taxable profits will be ava<span class=\"_ _2\"></span>ilable agains<span class=\"_ _e\"></span>t<span class=\"_ _e\"></span> which the asset can be utilised. Deferred tax <span class=\"_ _2\"></span>assets are reduced to the extent that it is no longer likely that<span class=\"_ _e\"></span> the related tax benefit will be realised. Additional income ta<span class=\"_ _2\"></span>xes that arise from the distribution of dividends are recognised at the same time as the liability to pay<span class=\"_ _e\"></span> the related dividend. 3.5 <span class=\"_ _235\"> </span>Statement<span class=\"_ _e\"></span> of comprehensive inc<span class=\"_ _2\"></span>ome and statement of changes in equity<span class=\"_ _e\"></span> The statement of <span class=\"_ _2\"></span>comprehensive income presents an overview of all revenues and expenses recognise<span class=\"_ _e\"></span>d in the consolidated statement of pro<span class=\"_ _2\"></span>fit or loss and in the consolidated statement of changes in equity. The gr<span class=\"_ _e\"></span>oup has elected to present comprehensive income using the two-<span class=\"_ _2\"></span>statement approach, i.e. the statement of profit or loss immediately followed by th<span class=\"_ _e\"></span>e statement of other comprehensive income. As a result o<span class=\"_ _2\"></span>f this approach, the content of the statement <span class=\"_ _e\"></span>of changes in equity is r<span class=\"_ _2\"></span>estricted to owner-<span class=\"_ _e\"></span>related changes.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForRegulatoryDeferralAccountsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__198": {
   "value": "3.4.1 <span class=\"_ _36\"> </span>Inco<span class=\"_ _e\"></span>me Revenu<span class=\"_ _e\"></span>es IFRS 15 est<span class=\"_ _2\"></span>ablishes a five-step model to account for <span class=\"_ _e\"></span>revenue arising from contracts <span class=\"_ _2\"></span>with customers and requires that revenue be recogn<span class=\"_ _2\"></span>ised at an amount that reflects the consideration to which an entity expects to be entitled in exchange for transferring goods or services to a customer. The<span class=\"_ _2\"></span>se are the five steps to consider for each customer contract: 1.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Identifing the contract(s) with a customer; </span></span>2.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Identifing the performance obligations in the contract(s); </span></span>3.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Determining the transaction price; </span></span>4.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Allocating the transaction price to the performance obligations; </span></span>5.<span class=\"ls0\"> <span class=\"_ _14c\"> </span><span class=\"fs8 fc3\">Recognising revenue when performance obligations are satisfied, or when control of goods or services is transferred to the </span></span>customer. The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s main revenues <span class=\"ff3f\">are realised by TSOs which o<span class=\"_ _e\"></span>perate in accordan<span class=\"_ _2\"></span>ce with r<span class=\"_ _e\"></span>egulatory frameworks and which have de </span></span>facto/lega<span class=\"_ _2\"></span>l monopolies in their respective control zones. T<span class=\"_ _e\"></span>he framewor<span class=\"_ _2\"></span>ks w<span class=\"_ _e\"></span>hich apply in the g<span class=\"ff42\">roup\u2019s </span>main countries of activity are detailed in<span class=\"_ _2\"></span> Note 9 <span class=\"ff42\">\u2018</span>Regulatory framework and tariffs<span class=\"ff42\">\u2019<span class=\"ff45\">.<span class=\"_ _e\"></span></span></span> With regard to the regulated bu<span class=\"_ _2\"></span>siness, each service is based on a standard contract with the customer, mostly with<span class=\"_ _e\"></span> a predefined regulated tariff (<span class=\"_ _2\"></span>unit price multiplied by th<span class=\"_ _e\"></span>e volume (injection or<span class=\"_ _2\"></span> offtake) or the reserved capacity (depending on the type of service)<span class=\"_ _e\"></span>), so pricing is not var<span class=\"_ _2\"></span>iable. The allocation of the transaction pri<span class=\"_ _e\"></span>ce over the different performance obligations is therefore <span class=\"_ _e\"></span>straightforward (one-to<span class=\"ls0\">-one relationship). Most of these con<span class=\"_ _2\"></span>tracts <span class=\"_ _e\"></span>are concluded for an indefinite period and have general payment terms of <span class=\"ls5b\">15</span>-30 days.<span class=\"_ _e\"></span> </span>Considerin<span class=\"_ _2\"></span>g the business of the Elia <span class=\"_ _e\"></span>group, there are no relevant right-<span class=\"ls78\">of<span class=\"_ _2\"></span><span class=\"ls0\">-return and warranty obligations. </span></span>For a<span class=\"_ _2\"></span>ll services provided by the group, Elia is the sole an<span class=\"_ _e\"></span>d primary party responsible for executing the service and is thus the principal. <span class=\"_ _e\"></span> However, in<span class=\"_ _2\"></span> its role as a TSO, Elia <span class=\"_ _e\"></span>Transmission Belgium SA/NV and 50Hertz Transmission GmbH are subject to public service obligation<span class=\"_ _2\"></span>s imposed by the government/regulation mechanisms. These oblig<span class=\"_ _e\"></span>ations mainly relate to financial support for the development of renewable ener<span class=\"_ _2\"></span>gy. TSOs act as agents for these activities, and since the expense/income streams are fully covered by tariffs, t<span class=\"_ _e\"></span>hey have no<span class=\"_ _2\"></span> impact on the statement of profit and loss. See section <span class=\"ff42\">\u2018</span>Levies<span class=\"ff42\">\u2019</span> of Note 3.3.14 for more information on the accounting treatment. The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s main performance obligations/contract types, their pricing and the rev<span class=\"ff3f\">e<span class=\"_ _e\"></span>nue recognition method for 2022 can be summarised </span></span>as follows: Revenue <span class=\"_ _e\"></span>by category for Elia Tran<span class=\"_ _2\"></span>smission Belgium Revenue stream Nature, customer and timing of satisfaction of performance o<span class=\"_ _2\"></span>bligations<span class=\"_ _e\"></span> Contract <span class=\"ff43\">\u2013</span> Price setting Grid revenues Technical studies<span class=\"ff3f\"> conducted at the request of grid users, connected directly to the </span>Contract and tariff approved by grid with a view to having a new connection built or an existing connection alt<span class=\"_ _2\"></span>ered. <span class=\"_ _20\"></span> regulator. The revenue is recognised at the point in time when the study is delivered. Fixed amount per type of study. Last-<span class=\"_ _e\"></span>mile conn<span class=\"_ _2\"></span>ection <span class=\"ff3f\">is a component of the grid connection contract. At the requ<span class=\"_ _2\"></span>est </span>Standard contract approved by of a future grid user, Elia constructs/adjusts a dedicated/ physical <span class=\"_ _2\"></span>connection, known regulator, but the price is set on as a last-mile connection, to connect the customer<span class=\"ff42\">\u2019s fac<span class=\"_ _e\"></span>ility to Eli<span class=\"_ _2\"></span>a\u2019s grid. Although </span>the basis of the budget for control of the asset is not transferred as such to the grid user, the <span class=\"_ _2\"></span>grid user obtains imple<span class=\"_ _e\"></span>menting the c<span class=\"_ _2\"></span>onnection. direct access to the high-vol<span class=\"_ _e\"></span>tage grid. The a<span class=\"_ _2\"></span>ccess right transferred by Elia is valuable to the grid user, hence why the grid user compensates Elia in cash. <span class=\"ff40\"> </span>Since the grid user simultaneously enters into a grid connectio<span class=\"_ _2\"></span>n contract, the t<span class=\"_ _e\"></span>w<span class=\"_ _2\"></span>o Grid connection activities (access right and grid connection services) are not distin<span class=\"_ _2\"></span>ct and constitute a single performance obli<span class=\"_ _e\"></span>gation and int<span class=\"_ _2\"></span>erdependence between the contracts. As the total amount of revenue recognised for this single performa<span class=\"_ _2\"></span>nce obligation, which includes grid connection services, is recognised over the life of the assets, the contract has no specific end date.  This component of the grid connection/grid user contract is presented separately  <span class=\"_ _2\"></span> (not part of the grid connection/revenues from the revenue cap) because the tariff<span class=\"_ _e\"></span>-setting method is very specific from a regulatory perspective. The fees charged to grid users/distribution sys<span class=\"_ _e\"></span>tem operators (DSO<span class=\"_ _2\"></span>s) cover the Contract and tariff approved by maintenance and operating<span class=\"ff3f\"> costs relating to the</span> de<span class=\"_ _e\"></span>dicated con<span class=\"_ _2\"></span>nection facilities. regulator. The revenue is recognised over time, as this service is performed continuously Tariff is set per asset type (e.g. throughout the contractual term. bay, km of cable). This component of the access contract signed with access holders/DSOs covers the Contract and tariff approved by development and management of the grid with a view to meeting capacity needs and regulator. Management and satisfying demand for electricity transmission.  EUR per kW/KVA for development of grid The revenue is recognised over time, as providing sufficient capacity and a resilient yearly/monthly peak and power infrastructure grid is a service performed continuously throughout the contractual term. available at access point. This component of the access contract signed with access holders/DSOs covers the Contract and tariff approved by mana<span class=\"_ _e\"></span>g<span class=\"_ _2\"></span>ement and operation of the electricity system and the offtak<span class=\"_ _2\"></span>e of additional regulator. Management of the reactive energy relat<span class=\"ls9d\">in<span class=\"_ _e\"></span></span>g <span class=\"ff42\">to Elia<span class=\"_ _e\"></span>\u2019s grid (different from the <span class=\"_ _2\"></span>connection assets).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>EUR per kW/ kVArh at access electricity system<span class=\"ff3f\"> </span>The revenue is recognised over time, as these services are performed continuously point.  throughout the contractual term. This component is part of the access contract signed with access <span class=\"_ _2\"></span>holders/DSOs, and Contract and tariff approved by covers (i) services to facilitate the energy market; (ii) services to <span class=\"_ _2\"></span>develop and regulator. enhance the integration of an effective and efficient electricity market;<span class=\"_ _e\"></span> (iii) the EUR per kW at access point. mana<span class=\"_ _e\"></span>g<span class=\"_ _2\"></span>ement of interconnectors and coordination with neighbouring countries and the European authorities; and (iv) the publication of data, as requir<span class=\"_ _2\"></span>ed by transparency Market integration obligations. The revenue is recognised over time,<span class=\"_ _e\"></span> as these services are <span class=\"_ _2\"></span>performed continuously throughout the contractual term. As defined in the BRP contract, the BRP<span class=\"_ _2\"></span> (Balance <span class=\"_ _e\"></span>Responsible Party) has a Contract and tariff/mechanism commitment to ensure a perfect balance between offtake and injection on the grid. In approved by regulator. Compensation for the event of an imbalance caused by a BRP, Elia has to activate the ancillary Based on market prices, EUR per imbalances services, <span class=\"_ _e\"></span>which are then invoiced t<span class=\"_ _2\"></span>o the <span class=\"_ _e\"></span>BRP. kW imbalance at access point. The revenue is recognised at the point in time when an imbalance<span class=\"_ _2\"></span> occurs.<span class=\"_ _e\"></span> Grid use along borders is organised through half<span class=\"_ _e\"></span>-yearly, quarterly,<span class=\"_ _2\"></span> monthly, weekly, Framework agreement with parties weekend, daily and intra-day auctions. Elia and the regulators decide which auctions and auction office. are conducted alon<span class=\"_ _e\"></span>g each border. Aucti<span class=\"_ _2\"></span>ons are organised through an auction office, Price is set based on price International revenues which acts as an agent. The auction office collects the revenues <span class=\"_ _2\"></span>paid by the difference in cross-border <span class=\"_ _e\"></span>mar<span class=\"_ _2\"></span>ket European energy traders, which are ultimately<span class=\"_ _e\"></span> shared between ne<span class=\"_ _2\"></span>ighbouring TSOs prices.  based on the volumes imported/exported on the border. The revenue is recognised at the point in time when an <span class=\"_ _e\"></span>import/exp<span class=\"_ _2\"></span>ort activity occurs. Revenue <span class=\"_ _e\"></span>by categor<span class=\"_ _2\"></span>y for 50 Hertz Transmission  Revenue stream Nature and timing of satisfaction of performance obligations Contract <span class=\"ff43\">\u2013</span> Price setting Grid revenues The \u2018grid use fee\u2019 is charged to grid users/DSOs connected to the <span class=\"_ _2\"></span>grid for the Standard contract and grid tariffs volume of injection and/or offtake on the onshore grid. This contract is signed with defined by regulator. grid users.  The revenue is recognised over time, as this service is a performed continuousl<span class=\"ls83\">y </span>throughout the contractual term. Revenues from incentive Last-<span class=\"_ _e\"></span>mile conn<span class=\"_ _2\"></span>ection <span class=\"ff42\">is a component of the \u2018grid use fee\u2019 contract. At the request </span>Standard contract approved by regulation<span class=\"ff3f\"> </span>of a future grid user, 50Hertz constructs a dedicated/physical connection, known as regulator, but the price is set on a last-mile connection, to create an interface point to the grid. Although control of the basis of the budget for the asset is not transferred as such to the grid user, the grid user obtains dire<span class=\"_ _2\"></span>ct imple<span class=\"_ _e\"></span>menting the c<span class=\"_ _2\"></span>onnection. access to the high-vo<span class=\"_ _e\"></span>ltage grid. Th<span class=\"_ _2\"></span>e access right<span class=\"_ _e\"></span> transferred by 50Hertz is valuable to the grid user, hence why the grid user compensates Elia in cash. <span class=\"ff40\"> </span>Since the grid user simultaneously enters into a grid connectio<span class=\"_ _2\"></span>n contract, the t<span class=\"_ _e\"></span>w<span class=\"_ _2\"></span>o activities (access right and grid connection services) are not d<span class=\"_ _e\"></span>istin<span class=\"_ _2\"></span>ct and constitute a single performance obligation and interdependence between the contr<span class=\"_ _2\"></span>acts.<span class=\"_ _e\"></span> As the total amount of revenue recognised for this single performa<span class=\"_ _2\"></span>nce obligation, which includes grid connection services, is recognised over the life of the <span class=\"_ _e\"></span>assets, the contract has no specific end date.  This component of the grid connection/grid user contract is presented separately (not part of the grid connection/revenues from the revenue cap) because the tariff<span class=\"_ _e\"></span>-setting method is very specific from a regula<span class=\"_ _e\"></span>tory perspective. This component comprises tariffs charged to grid users/DSOs to c<span class=\"_ _2\"></span>over grid Contract and tariffs predefined in Revenues from offshore connection costs for offshore wind farms.  regulatory mechanism. regulation The revenue is recognised over time, as this service is performed continuously throughout the contractual term  This revenue stream consists of different components  Cong<span class=\"_ _2\"></span>esti<span class=\"_ _e\"></span>on management and redispatch <span class=\"ff3f\">fees are paid by market participants for </span>Standard contracts approved by use of the capacity made available by 50Hertz on specific lines (i<span class=\"_ _2\"></span>ncluding use of regulator and tariff mechanism cross-border assets). This allocation mechanism is governed by tr<span class=\"_ _2\"></span>ansparent, defined in regulatory schemes.  market-or<span class=\"_ _e\"></span>iented pr<span class=\"_ _2\"></span>ocedures.  The revenue is recognised at the point in ti<span class=\"_ _e\"></span>me when it is g<span class=\"_ _2\"></span>enerated<span class=\"ff40\"> </span>Compensation for imbalances<span class=\"_ _e\"></span><span class=\"ff3f\">  </span>Market participants (BRPs) have a commitment to ensure a perfect balance Standard contracts approved by Energy revenues between offtake and injection on the grid. In the event of an imbalance, 50Hertz regulator and tariff mechanism invoices the market participant to compensa<span class=\"_ _e\"></span>te for the cost<span class=\"_ _2\"></span>s incurred. defined in regulatory schemes.  The revenue is recognised at the point in time when an <span class=\"_ _e\"></span>imbalance<span class=\"_ _2\"></span> occurs. Horizontal reimbursement of lignite back-up costs In its role as a TSO, 50Hertz charges fees to other TSOs for servi<span class=\"_ _2\"></span>ces related to the  reserve power re<span class=\"_ _e\"></span>quired by t<span class=\"_ _2\"></span>he legal framework. The revenue is recognised over time, as this service is performed continuously throughout the contractual term. Other rev<span class=\"_ _e\"></span>enues Revenue stream Nature and timing of satisfaction of performance obligations Contract <span class=\"ff43\">\u2013</span> Price setting Other revenues Elia Grid International provides consultancy services to third parties around the Contract negotiated between E<span class=\"ls102\">GI</span> world.  and customer. The revenue is recognised over the comp<span class=\"_ _e\"></span>letion of the contract.  The contract price is set when the Third-party services contract is concluded with the Third-party services are presented in other revenues. customer. The payment term is generally 30 days from the invoice date. Re.alto provides a platform throu<span class=\"_ _e\"></span>gh which energy actors (e.g. tra<span class=\"_ _2\"></span>ders, prosumers) The commission fee is a fixed can exchange energy data. re.alto receives a commission on transactions percentage on each transaction. undertaken via the platform. Commission fee The revenue is recognised at the point in t<span class=\"_ _e\"></span>ime when t<span class=\"_ _2\"></span>he transaction occurs. The commission fee is presented in other revenues. This mainly covers other services than those described above.  Others<span class=\"ff3f\"> </span>The revenue is recognised at the point in time when the service is complete. Consequently, all revenue com<span class=\"_ _2\"></span>ponents contain revenue from contracts with customers, i.e. parties that have contract<span class=\"_ _20\"></span>s in p<span class=\"_ _2\"></span>lace with the Group <span class=\"_ _2\"></span>to obtain services resulting from the Group<span class=\"ff42\">\u2019s o<span class=\"_ _e\"></span>rdinary activities in exchange for </span><span class=\"ls5b\">a </span>consideration. Other in<span class=\"_ _e\"></span>come  Other in<span class=\"_ _2\"></span>come is recognised when the related service is p<span class=\"_ _e\"></span>erformed and no further performance obligations arise<span class=\"fc1d\">. </span>Net r<span class=\"_ _e\"></span>egulatory<span class=\"_ _2\"></span> income (expense) from <span class=\"_ _e\"></span>settleme<span class=\"_ _2\"></span>nt mech<span class=\"_ _e\"></span>anism Since the tariffs are based on estimates, there is a<span class=\"_ _2\"></span>lways a<span class=\"_ _e\"></span> difference be<span class=\"_ _2\"></span>tween the tariffs that are actually charged and the tariffs that should ha<span class=\"_ _2\"></span>ve been charged (tariff setting is ag<span class=\"_ _e\"></span>reed with the <span class=\"ff42\">regulator) to cover all the system operator\u2019s reasonab<span class=\"_ _2\"></span>le <span class=\"_ _e\"></span>costs, <span class=\"ff3f\">including a </span></span>reasonable profit marg<span class=\"_ _2\"></span>in for the shareholders.<span class=\"_ _e\"></span> If the applied tariffs <span class=\"_ _2\"></span>result in a surplus or deficit at the end of the year, this means that the tariffs charged to consumer<span class=\"_ _e\"></span>s/the general public could<span class=\"_ _2\"></span> have been lower or higher. This surplus or de<span class=\"_ _e\"></span>ficit is therefore reported in the settlement mechanism deferra<span class=\"_ _2\"></span>l account. <span class=\"_ _20\"></span> The release<span class=\"_ _2\"></span> of this deferral account will impact future tariffs: where regulatory liabilities are incurred, future tariffs wi<span class=\"_ _e\"></span>ll be lower, and where regula<span class=\"_ _2\"></span>tory assets are incurred, future ta<span class=\"_ _e\"></span>riffs will be higher. The<span class=\"_ _2\"></span> net movement in the regulatory deferral accounts for the period is presen<span class=\"_ _2\"></span>ted separately in the statement of profit or loss <span class=\"ls1c\">in</span> the line 'Net income (expense) from settlement mechanism'. See also Note 3.3.17.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForRecognitionOfRevenue",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__199": {
   "value": "3.4.2 <span class=\"_ _36\"> </span>Expenses Other <span class=\"_ _e\"></span>expenses Property taxes are d<span class=\"_ _2\"></span>irectly recognised in full as soon as o<span class=\"_ _e\"></span>wnership is certain (generally on 1 January of the year in question). However, these cost<span class=\"_ _2\"></span>s, which are considered to be <span class=\"ls5b\">non<span class=\"_ _e\"></span></span>-controllable costs under the regulatory framework, are recorded as revenue through the settlement me<span class=\"_ _2\"></span>chanism for the same amount, resulting in zero imp<span class=\"_ _e\"></span>act in terms of profit or loss. Finance income and expensesFinance<span class=\"_ _2\"></span> expenses comprise interest payable on <span class=\"_ _e\"></span>borrowings (calculated using the effective interest rate method)<span class=\"ls1d\">, </span>in<span class=\"_ _e\"></span>terest on lease liabilities, fore<span class=\"_ _2\"></span>ign-exchange losses, gains on currency hed<span class=\"_ _e\"></span>ging instruments that offset currency losses, results on interest-rate hedging instruments, losse<span class=\"_ _2\"></span>s on hedging instruments that are not part of a hedge accounting relationship, losses on financial assets classified as being for trading purposes and imp<span class=\"_ _2\"></span>airment losses on financial assets as well as any losses from hedge ineffectiveness. <span class=\"_ _e\"></span> Finance<span class=\"_ _2\"></span> income includes interest receivables on bank deposits, which a<span class=\"_ _e\"></span>re recognised in profit or loss using the effective interest rate method as the<span class=\"_ _2\"></span>y accrue.<span class=\"_ _e\"></span> Borrowing c<span class=\"_ _2\"></span>osts that are not directly attributable to the acquisition, construction or production of a qualifying asset <span class=\"_ _e\"></span>are re<span class=\"_ _2\"></span>cognised in profit or loss using the<span class=\"_ _2\"></span> effective interest method.<span class=\"_ _e\"></span> Inco<span class=\"_ _e\"></span>me taxes<span class=\"_ _2\"></span> Income taxes comprise<span class=\"_ _2\"></span> current and deferred tax. Income <span class=\"_ _e\"></span>tax expense is recognised in profit or loss, except where it relates to items recogn<span class=\"_ _2\"></span>ised directly in equity. Taxes on hybrid coupons are recognised in the statement of profit and loss as these <span class=\"_ _e\"></span>are a tax on profits whereas <span class=\"_ _2\"></span>the hybrid coupon itself is recognised directly i<span class=\"_ _e\"></span>n equity. Curren<span class=\"_ _2\"></span>t tax is the expected tax payable on taxable income for the year, using tax rates enacted or substantively enacted at the end of the reporting period, and a<span class=\"_ _2\"></span>ny adjustments to tax payable in relation to previous years. Deferred tax <span class=\"_ _2\"></span>is recognised, using the balance she<span class=\"_ _e\"></span>et method, on temporary differences arising between the carrying<span class=\"_ _e\"></span> amounts of assets and liabilities for fin<span class=\"_ _2\"></span>ancial reporting purposes and the amounts used for taxation purposes. Deferred tax is not recognised for<span class=\"_ _e\"></span> the following tempor<span class=\"_ _2\"></span>ary differences: the initial recognition of assets or liabilities in a transaction that is not a business c<span class=\"_ _e\"></span>ombination and that affects ne<span class=\"_ _2\"></span>ither accounting nor taxable profit<span class=\"ls1d\">; </span>a<span class=\"_ _e\"></span>nd differences relating to investments in sub<span class=\"_ _2\"></span>sidiaries and joint ventur<span class=\"_ _e\"></span>es where these will probably <span class=\"ls5b\">not</span> <span class=\"ls5b\">be</span> reversed in the foreseeable future. In addition, deferred tax is not recognised for taxable temporary differences arising from initia<span class=\"_ _2\"></span>l recognition of goodwill. Deferred tax is measured at the tax rates that are expected to be applied to the tempor<span class=\"_ _e\"></span>ary differences when the<span class=\"_ _2\"></span>y are reversed, based on the laws that have been enacted or substantively enacted by the reporting date. Deferred tax assets and liabilities are o<span class=\"_ _2\"></span>ffset if there is a legally enforceable right to offset current tax liabilities and assets and the <span class=\"_ _e\"></span>deferred items relate to income ta<span class=\"_ _2\"></span>xes levied by the same tax authority on the same taxable entity or on different tax entities, but they a<span class=\"_ _e\"></span>re intend<span class=\"ls5b\">ed</span> to settle curren<span class=\"_ _2\"></span>t tax liabilities and assets on a net basis, or th<span class=\"_ _e\"></span>eir tax assets and liabilities will be<span class=\"_ _2\"></span> realised si<span class=\"_ _e\"></span>multaneously. A deferred ta<span class=\"_ _2\"></span>x asset is recognised only to the extent that it is likely that future taxable profits will be ava<span class=\"_ _2\"></span>ilable agains<span class=\"_ _e\"></span>t<span class=\"_ _e\"></span> which the asset can be utilised. Deferred tax <span class=\"_ _2\"></span>assets are reduced to the extent that it is no longer likely that<span class=\"_ _e\"></span> the related tax benefit will be realised. Additional income ta<span class=\"_ _2\"></span>xes that arise from the distribution of dividends are recognised at the same time as the liability to pay<span class=\"_ _e\"></span> the related dividend. 3.5 <span class=\"_ _235\"> </span>Statement<span class=\"_ _e\"></span> of comprehensive inc<span class=\"_ _2\"></span>ome and statement of changes in equity<span class=\"_ _e\"></span> The statement of <span class=\"_ _2\"></span>comprehensive income presents an overview of all revenues and expenses recognise<span class=\"_ _e\"></span>d in the consolidated statement of pro<span class=\"_ _2\"></span>fit or loss and in the consolidated statement of changes in equity. The gr<span class=\"_ _e\"></span>oup has elected to present comprehensive income using the two-<span class=\"_ _2\"></span>statement approach, i.e. the statement of profit or loss immediately followed by th<span class=\"_ _e\"></span>e statement of other comprehensive income. As a result o<span class=\"_ _2\"></span>f this approach, the content of the statement <span class=\"_ _e\"></span>of changes in equity is r<span class=\"_ _2\"></span>estricted to owner-<span class=\"_ _e\"></span>related changes.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForExpensesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__204": {
   "value": "Finance income and expensesFinance<span class=\"_ _2\"></span> expenses comprise interest payable on <span class=\"_ _e\"></span>borrowings (calculated using the effective interest rate method)<span class=\"ls1d\">, </span>in<span class=\"_ _e\"></span>terest on lease liabilities, fore<span class=\"_ _2\"></span>ign-exchange losses, gains on currency hed<span class=\"_ _e\"></span>ging instruments that offset currency losses, results on interest-rate hedging instruments, losse<span class=\"_ _2\"></span>s on hedging instruments that are not part of a hedge accounting relationship, losses on financial assets classified as being for trading purposes and imp<span class=\"_ _2\"></span>airment losses on financial assets as well as any losses from hedge ineffectiveness. <span class=\"_ _e\"></span> Finance<span class=\"_ _2\"></span> income includes interest receivables on bank deposits, which a<span class=\"_ _e\"></span>re recognised in profit or loss using the effective interest rate method as the<span class=\"_ _2\"></span>y accrue.<span class=\"_ _e\"></span> Borrowing c<span class=\"_ _2\"></span>osts that are not directly attributable to the acquisition, construction or production of a qualifying asset <span class=\"_ _e\"></span>are re<span class=\"_ _2\"></span>cognised in profit or loss using the<span class=\"_ _2\"></span> effective interest method.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForInterestIncomeAndExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__203": {
   "value": "Finance income and expensesFinance<span class=\"_ _2\"></span> expenses comprise interest payable on <span class=\"_ _e\"></span>borrowings (calculated using the effective interest rate method)<span class=\"ls1d\">, </span>in<span class=\"_ _e\"></span>terest on lease liabilities, fore<span class=\"_ _2\"></span>ign-exchange losses, gains on currency hed<span class=\"_ _e\"></span>ging instruments that offset currency losses, results on interest-rate hedging instruments, losse<span class=\"_ _2\"></span>s on hedging instruments that are not part of a hedge accounting relationship, losses on financial assets classified as being for trading purposes and imp<span class=\"_ _2\"></span>airment losses on financial assets as well as any losses from hedge ineffectiveness. <span class=\"_ _e\"></span> Finance<span class=\"_ _2\"></span> income includes interest receivables on bank deposits, which a<span class=\"_ _e\"></span>re recognised in profit or loss using the effective interest rate method as the<span class=\"_ _2\"></span>y accrue.<span class=\"_ _e\"></span> Borrowing c<span class=\"_ _2\"></span>osts that are not directly attributable to the acquisition, construction or production of a qualifying asset <span class=\"_ _e\"></span>are re<span class=\"_ _2\"></span>cognised in profit or loss using the<span class=\"_ _2\"></span> effective interest method.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinanceIncomeAndCostsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__205": {
   "value": "Borrowing c<span class=\"_ _2\"></span>osts that are not directly attributable to the acquisition, construction or production of a qualifying asset <span class=\"_ _e\"></span>are re<span class=\"_ _2\"></span>cognised in profit or loss using the<span class=\"_ _2\"></span> effective interest method.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForBorrowingCostsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__206": {
   "value": "Inco<span class=\"_ _e\"></span>me taxes<span class=\"_ _2\"></span> Income taxes comprise<span class=\"_ _2\"></span> current and deferred tax. Income <span class=\"_ _e\"></span>tax expense is recognised in profit or loss, except where it relates to items recogn<span class=\"_ _2\"></span>ised directly in equity. Taxes on hybrid coupons are recognised in the statement of profit and loss as these <span class=\"_ _e\"></span>are a tax on profits whereas <span class=\"_ _2\"></span>the hybrid coupon itself is recognised directly i<span class=\"_ _e\"></span>n equity. Curren<span class=\"_ _2\"></span>t tax is the expected tax payable on taxable income for the year, using tax rates enacted or substantively enacted at the end of the reporting period, and a<span class=\"_ _2\"></span>ny adjustments to tax payable in relation to previous years. Deferred tax <span class=\"_ _2\"></span>is recognised, using the balance she<span class=\"_ _e\"></span>et method, on temporary differences arising between the carrying<span class=\"_ _e\"></span> amounts of assets and liabilities for fin<span class=\"_ _2\"></span>ancial reporting purposes and the amounts used for taxation purposes. Deferred tax is not recognised for<span class=\"_ _e\"></span> the following tempor<span class=\"_ _2\"></span>ary differences: the initial recognition of assets or liabilities in a transaction that is not a business c<span class=\"_ _e\"></span>ombination and that affects ne<span class=\"_ _2\"></span>ither accounting nor taxable profit<span class=\"ls1d\">; </span>a<span class=\"_ _e\"></span>nd differences relating to investments in sub<span class=\"_ _2\"></span>sidiaries and joint ventur<span class=\"_ _e\"></span>es where these will probably <span class=\"ls5b\">not</span> <span class=\"ls5b\">be</span> reversed in the foreseeable future. In addition, deferred tax is not recognised for taxable temporary differences arising from initia<span class=\"_ _2\"></span>l recognition of goodwill. Deferred tax is measured at the tax rates that are expected to be applied to the tempor<span class=\"_ _e\"></span>ary differences when the<span class=\"_ _2\"></span>y are reversed, based on the laws that have been enacted or substantively enacted by the reporting date. Deferred tax assets and liabilities are o<span class=\"_ _2\"></span>ffset if there is a legally enforceable right to offset current tax liabilities and assets and the <span class=\"_ _e\"></span>deferred items relate to income ta<span class=\"_ _2\"></span>xes levied by the same tax authority on the same taxable entity or on different tax entities, but they a<span class=\"_ _e\"></span>re intend<span class=\"ls5b\">ed</span> to settle curren<span class=\"_ _2\"></span>t tax liabilities and assets on a net basis, or th<span class=\"_ _e\"></span>eir tax assets and liabilities will be<span class=\"_ _2\"></span> realised si<span class=\"_ _e\"></span>multaneously. A deferred ta<span class=\"_ _2\"></span>x asset is recognised only to the extent that it is likely that future taxable profits will be ava<span class=\"_ _2\"></span>ilable agains<span class=\"_ _e\"></span>t<span class=\"_ _e\"></span> which the asset can be utilised. Deferred tax <span class=\"_ _2\"></span>assets are reduced to the extent that it is no longer likely that<span class=\"_ _e\"></span> the related tax benefit will be realised. Additional income ta<span class=\"_ _2\"></span>xes that arise from the distribution of dividends are recognised at the same time as the liability to pay<span class=\"_ _e\"></span> the related dividend.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__207": {
   "value": "Deferred tax <span class=\"_ _2\"></span>is recognised, using the balance she<span class=\"_ _e\"></span>et method, on temporary differences arising between the carrying<span class=\"_ _e\"></span> amounts of assets and liabilities for fin<span class=\"_ _2\"></span>ancial reporting purposes and the amounts used for taxation purposes. Deferred tax is not recognised for<span class=\"_ _e\"></span> the following tempor<span class=\"_ _2\"></span>ary differences: the initial recognition of assets or liabilities in a transaction that is not a business c<span class=\"_ _e\"></span>ombination and that affects ne<span class=\"_ _2\"></span>ither accounting nor taxable profit<span class=\"ls1d\">; </span>a<span class=\"_ _e\"></span>nd differences relating to investments in sub<span class=\"_ _2\"></span>sidiaries and joint ventur<span class=\"_ _e\"></span>es where these will probably <span class=\"ls5b\">not</span> <span class=\"ls5b\">be</span> reversed in the foreseeable future. In addition, deferred tax is not recognised for taxable temporary differences arising from initia<span class=\"_ _2\"></span>l recognition of goodwill. Deferred tax is measured at the tax rates that are expected to be applied to the tempor<span class=\"_ _e\"></span>ary differences when the<span class=\"_ _2\"></span>y are reversed, based on the laws that have been enacted or substantively enacted by the reporting date. Deferred tax assets and liabilities are o<span class=\"_ _2\"></span>ffset if there is a legally enforceable right to offset current tax liabilities and assets and the <span class=\"_ _e\"></span>deferred items relate to income ta<span class=\"_ _2\"></span>xes levied by the same tax authority on the same taxable entity or on different tax entities, but they a<span class=\"_ _e\"></span>re intend<span class=\"ls5b\">ed</span> to settle curren<span class=\"_ _2\"></span>t tax liabilities and assets on a net basis, or th<span class=\"_ _e\"></span>eir tax assets and liabilities will be<span class=\"_ _2\"></span> realised si<span class=\"_ _e\"></span>multaneously. A deferred ta<span class=\"_ _2\"></span>x asset is recognised only to the extent that it is likely that future taxable profits will be ava<span class=\"_ _2\"></span>ilable agains<span class=\"_ _e\"></span>t<span class=\"_ _e\"></span> which the asset can be utilised. Deferred tax <span class=\"_ _2\"></span>assets are reduced to the extent that it is no longer likely that<span class=\"_ _e\"></span> the related tax benefit will be realised.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDeferredIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__29": {
   "value": "4.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Segment reporting</span>4.1 <span class=\"_ _148\"> </span>Basis for segment reporting The group<span class=\"_ _2\"></span> has opted for segment reporting, in conformity <span class=\"_ _e\"></span>with the different regulatory frameworks that currently exi<span class=\"_ _e\"></span>st within the group. This reporting approach closely reflects the g<span class=\"ff42\">roup\u2019s operational activitie<span class=\"_ _2\"></span>s and<span class=\"ff3f\"> is also in line with the g<span class=\"_ _e\"></span></span>roup\u2019s internal reporting to the </span>Chief Operating De<span class=\"_ _2\"></span>cision Maker (CODM), e<span class=\"_ _e\"></span>nabling the CODM to better evaluate and assess the g<span class=\"ff42\">roup\u2019s performance and a</span>ctivities in a transparent <span class=\"_ _2\"></span>way.<span class=\"_ _e\"></span> Pursuant to IF<span class=\"_ _2\"></span>RS 8, the group has identified the following <span class=\"_ _e\"></span>opera<span class=\"_ _2\"></span>ting segments based on the aforementioned criteria:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Elia Tra<span class=\"_ _2\"></span>nsmission (Belgium), which comprises the activities based undertaken in line with <span class=\"_ _e\"></span>the Belgian regulatory framework:<span class=\"_ _2\"></span> the </span></span>regulated act<span class=\"_ _2\"></span>ivities of Elia Transmission Belgium SA/NV<span class=\"_ _e\"></span>, El<span class=\"_ _e\"></span>ia Asset SA/NV, Elia Engineering SA/NV, Elia Re SA, HGRT SAS and Coreso SA/NV, whose act<span class=\"_ _2\"></span>ivities are directly linked to the role of the Belgian transmission system operator and are<span class=\"_ _e\"></span> subject to the regulatory frame<span class=\"_ _2\"></span>work applicable in Belgium <span class=\"ff42\">\u2013</span> s<span class=\"_ _e\"></span>ee Section 9.1.3. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">50Her<span class=\"_ _2\"></span>tz Transmission (Germany), which comprises the activities undertaken in line with the German regulatory framework: </span></span>Eurogrid GmbH, 50Hertz<span class=\"_ _2\"></span> Transmission GmbH and 50Hertz Offshore GmbH, whos<span class=\"_ _e\"></span>e activities are directly linked to the role of the transmission system<span class=\"_ _2\"></span> operator in Germany <span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span> see Section 9.2.3. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Non-r<span class=\"_ _2\"></span>egulated activities and Nemo Link, comprising<span class=\"ls1d\">: <span class=\"_ _e\"></span></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Elia Group NV/SA, mainly consisting of the holding activities in the Elia Transmission (Belgium) <span class=\"ls5b\">and </span>5<span class=\"_ _e\"></span>0Hertz Transmission </span></span>(Germany) segment<span class=\"ls1d\">; </span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Eurogrid International NV/SA; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">the h<span class=\"_ _e\"></span>olding <span class=\"_ _e\"></span>activities in<span class=\"_ _e\"></span> Nem<span class=\"_ _e\"></span>o Link <span class=\"_ _e\"></span>Lt<span class=\"_ _e\"></span>d. <span class=\"_ _e\"></span>This co<span class=\"_ _e\"></span>mpany co<span class=\"_ _e\"></span>mprises and<span class=\"_ _e\"></span> manages <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>Nemo <span class=\"_ _e\"></span>project, w<span class=\"_ _e\"></span>hich <span class=\"_ _e\"></span>connects <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>UK<span class=\"_ _e\"></span> </span></span>and <span class=\"_ _4b\"></span>Belgium <span class=\"_ _2\"></span>using <span class=\"_ _2\"></span>high-voltage e<span class=\"_ _2\"></span>lectricity <span class=\"_ _4b\"></span>c<span class=\"_ _e\"></span>ables, <span class=\"_ _2\"></span>enab<span class=\"_ _2\"></span>lin<span class=\"_ _e\"></span>g <span class=\"_ _2\"></span>power <span class=\"_ _4b\"></span>to<span class=\"_ _e\"></span> <span class=\"_ _2\"></span>be <span class=\"_ _4b\"></span>excha<span class=\"_ _e\"></span>nged <span class=\"_ _2\"></span>between <span class=\"_ _4b\"></span>the <span class=\"_ _2\"></span>two <span class=\"_ _2\"></span>countries <span class=\"_ _2\"></span>and <span class=\"_ _4b\"></span>f<span class=\"_ _e\"></span>or <span class=\"_ _4b\"></span>which<span class=\"_ _e\"></span> a specific regulatory framework ha<span class=\"_ _2\"></span>s been set up <span class=\"ff42\">\u2013</span> see Se<span class=\"_ _e\"></span>ction 9.3 for more<span class=\"_ _2\"></span> details;<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">the non-regulated activities <span class=\"ls5b\">of</span> t<span class=\"_ _e\"></span>he Elia Transmission (Belgi<span class=\"_ _e\"></span>um) segmen<span class=\"_ _2\"></span>t<span class=\"_ _e\"></span><span class=\"ls1d\">. </span><span class=\"ff42\">\u2019</span>N<span class=\"ls5b\">on</span>-<span class=\"_ _e\"></span>regulated activities<span class=\"ff42 ls1c\">\u2019 </span>refers to activities which<span class=\"_ _e\"></span> </span></span>are not dire<span class=\"_ _2\"></span>ctly related to the role of <span class=\"ls5b\">a <span class=\"_ _e\"></span></span>TSO <span class=\"ff42\">\u2013</span> see Section 9.1;<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">EGI <span class=\"_ _2\"></span>(Elia <span class=\"_ _4b\"></span>Grid <span class=\"_ _2\"></span>Inter<span class=\"_ _2\"></span>national <span class=\"_ _4b\"></span>NV/S<span class=\"_ _e\"></span>A, <span class=\"_ _4b\"></span>E<span class=\"_ _e\"></span>lia <span class=\"_ _4b\"></span>Grid <span class=\"_ _2\"></span>Intern<span class=\"_ _2\"></span>ational <span class=\"_ _4b\"></span>GmbH<span class=\"_ _e\"></span><span class=\"ls1d\">, <span class=\"_ _2\"></span><span class=\"ls0\">Elia <span class=\"_ _4b\"></span>Grid <span class=\"_ _2\"></span>Inte<span class=\"_ _2\"></span>rnational <span class=\"_ _4b\"></span>P<span class=\"_ _e\"></span>te. <span class=\"_ _4b\"></span>Ltd Singa<span class=\"_ _2\"></span>pore <span class=\"_ _4b\"></span>(closed <span class=\"_ _2\"></span>in <span class=\"_ _2\"></span>2022<span class=\"_ _2\"></span>),<span class=\"_ _e\"></span> </span></span></span></span>Elia <span class=\"_ _e\"></span>Grid <span class=\"_ _e\"></span>International <span class=\"_ _20\"></span>LLC <span class=\"_ _e\"></span>Saudi <span class=\"_ _20\"></span>Arabia <span class=\"_ _e\"></span>and<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>Elia <span class=\"_ _20\"></span>Grid<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>International Inc<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>Cana<span class=\"_ _e\"></span>da <span class=\"_ _e\"></span>(<span class=\"_ _e\"></span><span class=\"ls5b\">a <span class=\"_ _20\"></span></span>new <span class=\"_ _e\"></span>subsidiary <span class=\"_ _e\"></span>inc<span class=\"_ _e\"></span>orporated <span class=\"_ _e\"></span>in<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>2022<span class=\"_ _e\"></span>)<span class=\"ls95\">, </span>which <span class=\"_ _24d\"> </span>are <span class=\"_ _57\"> </span>companies <span class=\"_ _57\"> </span>that <span class=\"_ _57\"> </span>s<span class=\"_ _e\"></span>upply <span class=\"_ _24d\"> </span>speci<span class=\"_ _e\"></span>alists <span class=\"_ _57\"> </span>in <span class=\"_ _24d\"> </span>consulti<span class=\"_ _e\"></span>ng, <span class=\"_ _24d\"> </span>services, <span class=\"_ _57\"> </span>engin<span class=\"_ _e\"></span>eering <span class=\"_ _24d\"> </span>and <span class=\"_ _7c\"> </span>pr<span class=\"_ _2\"></span>ocurement, <span class=\"_ _24d\"> </span>cr<span class=\"_ _e\"></span>eating <span class=\"_ _24d\"> </span>v<span class=\"_ _e\"></span>alue <span class=\"_ _24d\"> </span>b<span class=\"_ _e\"></span>y<span class=\"_ _e\"></span> delivering<span class=\"_ _2\"></span> solutions based on international best practice w<span class=\"_ _e\"></span>hile fully complying with regulated business environments; o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Re.Alto-Energy <span class=\"_ _e\"></span>BV/SRL <span class=\"_ _20\"></span>and Re.Alto-Energy <span class=\"_ _e\"></span>GmbH, <span class=\"_ _e\"></span>a <span class=\"_ _20\"></span>start-up f<span class=\"_ _e\"></span>ounded <span class=\"_ _e\"></span>in <span class=\"_ _e\"></span>August <span class=\"_ _e\"></span>2019 <span class=\"_ _20\"></span>which <span class=\"_ _e\"></span>is <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>first <span class=\"_ _e\"></span>E<span class=\"_ _e\"></span>uropean <span class=\"_ _e\"></span>digital </span></span>marketp<span class=\"_ _2\"></span>lace for energy data and services;<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Windgrid, <span class=\"_ _e\"></span>a <span class=\"_ _20\"></span>new <span class=\"_ _20\"></span>entity <span class=\"_ _e\"></span>created <span class=\"_ _20\"></span>during <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>he <span class=\"_ _e\"></span>reporting <span class=\"_ _20\"></span>period <span class=\"_ _e\"></span>20<span class=\"_ _e\"></span>22, <span class=\"_ _e\"></span>w<span class=\"_ _e\"></span>hich <span class=\"_ _e\"></span>was<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>est<span class=\"_ _e\"></span>ablished <span class=\"_ _20\"></span>to <span class=\"_ _e\"></span>manage <span class=\"_ _20\"></span>expected <span class=\"_ _e\"></span>increase <span class=\"_ _e\"></span>in<span class=\"_ _20\"></span> </span></span>investmen<span class=\"_ _2\"></span>ts in renewable energy production and the offshore grid exp<span class=\"_ _e\"></span>ansion. The CODM has been identified<span class=\"_ _2\"></span> by the group as t<span class=\"_ _e\"></span>he Boards of Directors, CEOs and Management Committees of ea<span class=\"_ _e\"></span>ch segment. The CODM periodically re<span class=\"_ _2\"></span>views the performance of the gr<span class=\"_ _e\"></span>oup's segments using various indicators such as revenue, EBITDA and operating profit. The information presented to the CODM follows the group's IFRS accounting policies, so no reconciling items have to be disclosed. 4.2 <span class=\"_ _235\"> </span>Elia Transmission (Belgium) The table be<span class=\"_ _2\"></span>low shows the 2022 consolidated results f<span class=\"ls5b\">or</span> <span class=\"_ _e\"></span>Elia Transmission (Belgium) Result<span class=\"_ _2\"></span>s Elia Tr<span class=\"_ _e\"></span>ansmission  <span class=\"_ _2\"></span>(in \u20ac million) \u2212  <span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span> Differen<span class=\"_ _2\"></span>ce (%) <span class=\"_ _e\"></span> period<span class=\"_ _2\"></span> ended 31 December Revenue, other income an<span class=\"_ _2\"></span>d net income (expense) from 1,561.3 1,199.5 30.2% settlement me<span class=\"_ _2\"></span>chanism<span class=\"_ _e\"></span> Revenues 1,420.4 1,009.8 40.7% Other in<span class=\"_ _2\"></span>come<span class=\"_ _e\"></span> 147.6 68.3 116.1% Net income<span class=\"_ _2\"></span> (expense) from settlement mechanism<span class=\"_ _e\"></span> (6.7) 121.4 (105.5<span class=\"_ _2\"></span>%) Depreciation, amortisa<span class=\"_ _2\"></span>tion, impairment and changes in (214.4) (205.1) 4.5% provisions  Results from operatin<span class=\"_ _2\"></span>g activities <span class=\"_ _e\"></span> 259.6 224.8 15.5% Equity accoun<span class=\"_ _2\"></span>ted investees<span class=\"_ _e\"></span> 2.4 2.3 3.3% EBIT 262.0 227.1 15.4% EBITDA 476.4 432.2 10.2% Finance<span class=\"_ _2\"></span> income 1.3 1.7 (23.5%) Finance<span class=\"_ _2\"></span> costs <span class=\"_ _e\"></span> (63.7) (64.8) (1.7%) Income tax exp<span class=\"_ _2\"></span>enses <span class=\"_ _e\"></span> (42.7) (32.9) 29.7% Net prof<span class=\"_ _2\"></span>it<span class=\"_ _e\"></span> 156.9 131.0 19.8% Consolidated<span class=\"_ _2\"></span> statement of financial position  31 Decembe<span class=\"_ _2\"></span>r 2022<span class=\"_ _e\"></span> 31 Decembe<span class=\"_ _2\"></span>r 2021<span class=\"_ _e\"></span>  Differen<span class=\"_ _2\"></span>ce (%) <span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Total a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 7,848.6 7,153.5 9.7% Capital expenditures 449.0 417.2 7.6% Net financia<span class=\"_ _2\"></span>l debt<span class=\"_ _e\"></span> 2,916.2 3,441.0 (15.3%) The tariff methodology <span class=\"_ _2\"></span>approved by the CREG on <span class=\"_ _e\"></span>7 November 2019 came into force in 2020. The methodology is applicable for a four-year period (2020 <span class=\"ff42\">\u2013</span> 2023). See Note 9.1 for more in<span class=\"_ _2\"></span>forma<span class=\"_ _e\"></span>tion about the new regulatory framework.  Financial Elia Transmission<span class=\"_ _2\"></span>'s revenue<span class=\"ff3f\"> <span class=\"ff42\">was up 30.2% compared wi<span class=\"_ _e\"></span>th last yea<span class=\"_ _2\"></span>r, increasing from \u20ac1,199.5 million to \u20ac1,561.3 million. Revenue </span></span>was impacted by a<span class=\"_ _2\"></span> higher regulated net profit, higher depreciations linked to the growing asset base, one<span class=\"_ _e\"></span>-off tariff compensation for the financial cost<span class=\"_ _2\"></span> linked to the capital increase (i.e. portion allocated to ETB) and higher costs for ancillary services. Higher a<span class=\"_ _e\"></span>ncillary services re<span class=\"_ _2\"></span>sulted from the high gas prices caused by the war in Ukraine and, to a lesser, extent the increase in imb<span class=\"_ _e\"></span>alance volume caused b<span class=\"_ _2\"></span>y the increase in the share occupied by renewab<span class=\"_ _e\"></span>les in the energy mix. The table be<span class=\"_ _2\"></span>low provides more details about revenue component changes:<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Difference (%) Grid revenue: 1,415.8 1,006.0 40.7%   <span class=\"ls0\"> Grid connection </span>44.8 45.1 (0.6%)   <span class=\"ls0\"> Management and development of grid in<span class=\"_ _2\"></span>frastructure<span class=\"_ _e\"></span> </span>475.3 480.6 (1.1%)   <span class=\"ls0\"> Management of the electrical system </span>149.8 149.0 0.6%   <span class=\"ls0\"> Compensation for imbalances </span>365.0 220.6 65.4%   <span class=\"ls0\"> Market integration </span>22.2 23.2 (4.0%)   <span class=\"ls0\"> International revenue </span>358.6 87.5 309.6% Last mile connect<span class=\"_ _2\"></span>ion<span class=\"_ _e\"></span> 3.5 2.9 19.6% Other revenue 1.1 0.8 27.3% Subtotal r<span class=\"_ _2\"></span>evenue 1,420.4 1,009.8 40.7% Other in<span class=\"_ _2\"></span>come<span class=\"_ _e\"></span> 147.6 68.3 116.1% Net income<span class=\"_ _2\"></span> (expense) from settlement mechanism<span class=\"_ _e\"></span> (6.7) 121.4 (105.5<span class=\"_ _2\"></span>%) Total revenue and<span class=\"_ _2\"></span> other income<span class=\"_ _e\"></span> 1,561.3 1,199.5 30.2% Revenues from<span class=\"_ _2\"></span> the <span class=\"ff40\">management and development of grid infrastructure</span>, the <span class=\"ff40\">management of the electrical system</span><span class=\"ls1d\">, </span><span class=\"ff40\">m<span class=\"_ _e\"></span>arket </span>integration<span class=\"ff3f\"> and </span>grid connection<span class=\"ff3f\"> remained stable<span class=\"_ _2\"></span> compa<span class=\"_ _e\"></span>red to 2021. <span class=\"_ _e\"></span> </span>Services rendered in the area o<span class=\"_ _2\"></span>f energy management and the individual balancing of balancing groups are paid under <span class=\"_ _e\"></span><span class=\"ff40\">revenues from </span>compensation<span class=\"_ _2\"></span> for imbalances<span class=\"ff3f\">. These revenues, which increased from <span class=\"ff42\">\u20ac2<span class=\"_ _e\"></span>20.6 million to \u20ac365.0</span> million (+65.4%), were largely due to </span>the tar<span class=\"_ _2\"></span>iff for maintaining and restoring the residual balance of individual access responsible parties (+\u20ac147.8 <span class=\"_ _e\"></span><span class=\"ff3f\">million). The higher balance </span>activation co<span class=\"_ _2\"></span>sts due to the increase in gas prices caused <span class=\"_ _e\"></span>by the war in Ukraine and, to a lesser extent, the increase in imbalance volume caused b<span class=\"_ _2\"></span>y the increase in the share occupied by renewab<span class=\"_ _e\"></span>les (in particular<span class=\"_ _2\"></span> offshore wind) <span class=\"_ _e\"></span>- which are more heavily influenced by forecast<span class=\"_ _2\"></span> differences in the generation mix - we<span class=\"_ _e\"></span>re the main drivers of the revenue increase.   International <span class=\"_ _2\"></span>revenue<span class=\"ff3f\"> increased <span class=\"ff42\">to \u20ac358.6 million (+309.6%)<span class=\"_ _e\"></span></span>, mainly due to increasing congestion income on the border with France. </span>Indeed<span class=\"_ _2\"></span>, the prices in France are higher than in the rest of Europe due to nuclear outages, and Belgium, as direct ne<span class=\"_ _e\"></span>ighbour of France, has a big<span class=\"_ _2\"></span> share of the congestion revenues linked to price spread with France.<span class=\"_ _e\"></span> The<span class=\"ff40\"> last mile connection (<span class=\"_ _2\"></span>previously called transfer of asset from customers) increased <span class=\"ff3f\">co<span class=\"_ _e\"></span>mpared to the previous year, so driving </span></span>the further<span class=\"_ _2\"></span> electrification of the power sector, while <span class=\"ff40\">other <span class=\"_ _e\"></span>revenues</span> also increased, mainly due to works delivered to third parties. The <span class=\"ff40\">settlement mechan<span class=\"_ _2\"></span>ism<span class=\"ff3f\"> decreased from <span class=\"ff42\">\u20ac121.4</span> milli<span class=\"_ _e\"></span>on in 2021 to -<span class=\"ff42\">\u20ac6.7</span> million in 2022 and encompassed both deviations in the </span></span>curren<span class=\"_ _2\"></span>t year from the budget approved by the regulator (-<span class=\"ff42\">\u20ac132.4 million) and the settlement of net surpluses from the previous tariff </span>period (\u20ac<span class=\"ff3f\">125.7 million). The opera<span class=\"_ _2\"></span>ting surplus (<span class=\"_ _e\"></span>-<span class=\"ff42\">\u20ac132.4 million), </span>with respect to budgeted costs and revenue authorised by the re<span class=\"_ _2\"></span>gulator, </span>will be returned<span class=\"_ _2\"></span> to consumers in a future tariff period. The surplus was primarily the result of higher costs for ancillary s<span class=\"_ _e\"></span><span class=\"ff42\">ervices (+\u20ac228.6 </span>million), h<span class=\"_ _2\"></span>igher influenceable costs (+\u20ac<span class=\"_ _e\"></span><span class=\"ff3f ls5b\">21<span class=\"ls0\">2.7 </span></span>million) and a higher net profit (+\u20ac<span class=\"ff3f\">28.7 million). This was more than offset by an increase in </span>tariff sale<span class=\"_ _2\"></span>s (-<span class=\"ff42\">\u20ac247.0 million), which was mainly driven by imbalance compensations, and higher international and other sales (<span class=\"_ _e\"></span></span>-<span class=\"ff42\">\u20ac396.7 </span>million), inclu<span class=\"_ _2\"></span>ding the within-<span class=\"ff42\">period Cap &amp; Floor adjustment for Nemo Link (\u20ac69.1 million), as the cap surplus needs to be returned to the </span>tariffs. EBITDA<span class=\"ff3f\"> <span class=\"ff42\">rose to \u20ac</span>476.4 million (+10.2%) due to a high<span class=\"_ _2\"></span>er regulated net profit, higher depreciations linked to the growing asset base an<span class=\"_ _e\"></span>d </span>higher f<span class=\"_ _2\"></span>inancial costs all passed through into revenue. The <span class=\"_ _e\"></span><span class=\"ff40\">EBIT </span>i<span class=\"_ _e\"></span>ncrease wa<span class=\"_ _2\"></span>s more pronounced<span class=\"ff40\"> </span>(+15.4%), mainly due the lower depre<span class=\"_ _2\"></span>ciations of assets not covered by tariffs, being the in<span class=\"_ _e\"></span>tangible a<span class=\"_ _2\"></span>ssets expensed during the previous regulatory period an<span class=\"_ _e\"></span>d activated under<span class=\"_ _2\"></span> IFRS and for leasing contracts. The contribution of equity-<span class=\"ff42\">acc<span class=\"_ _e\"></span>ounted investments remained flat at \u20ac2.4 million, linked t<span class=\"_ _2\"></span>o the </span>contribu<span class=\"_ _2\"></span>tion from HGRT. Net finance cost <span class=\"ff3f\">sligh<span class=\"_ _2\"></span>tly decreased (-1.<span class=\"_ _e\"></span>1%) compared with the previo<span class=\"_ _2\"></span>us year. This was mainly driven by the higher activation of </span>borro<span class=\"_ _2\"></span>wing costs due to the growth of the asset base (\u20ac2.1 million) and partially offset by other financial co<span class=\"_ _2\"></span>sts. The fi<span class=\"_ _e\"></span>nanci<span class=\"_ _e\"></span><span class=\"ff3f\">al costs linked </span>to Elia Grou<span class=\"_ _2\"></span>p\u2019s capital increase were allocated to the Belgian regulated ac<span class=\"_ _e\"></span><span class=\"ff3f\">tivities on a pro-rata basis in accordance with the use of </span>proceeds. Under IF<span class=\"_ _2\"></span>RS, these costs (\u20ac3.6 million) are directly accounted through equity. During 2022, ETB did not tap into the<span class=\"ff3f\"> de<span class=\"_ _e\"></span>bt </span>market and had a<span class=\"_ _2\"></span> well-balanced debt maturity profile. The<span class=\"_ _e\"></span> average cost of debt remained at 1.9% at the end 2022 and all outstanding debt had a f<span class=\"_ _2\"></span>ixed coupon.<span class=\"_ _e\"></span> Net prof<span class=\"_ _2\"></span>it <span class=\"ff42\">rose by 19.8% to \u20ac156.9 million, mainly due to the following:<span class=\"ff3f\"> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3 ls27\">A <span class=\"ff40 ls0\">h<span class=\"_ _2\"></span>igher fair remuneration<span class=\"ff3f\"> <span class=\"ff42\">(+\u20ac12.1 million</span>) due to asset growth and higher equity. The increase in equity was mainly driven by </span></span></span></span>the proceed<span class=\"_ _2\"></span>s allocated to the Belgian regulated activities (\u20ac290.1 million) following Elia Group\u2019s capital increase. <span class=\"ff3f\">A<span class=\"_ _e\"></span>dditionally, the </span>fair remuneration<span class=\"_ _2\"></span> benefitted from the ca<span class=\"_ _e\"></span>pital grant received from<span class=\"_ _2\"></span> the Federal Government in relation to the Princess Elisabeth Island (\u20ac73.1<span class=\"_ _2\"></span> million net of deferred tax) and recognised as part of the regulated equity.<span class=\"ff3f\"> <span class=\"_ _e\"></span> </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Incre<span class=\"_ _2\"></span>ase in <span class=\"ff40\">incentives</span> <span class=\"ff42\">(+\u20ac1.4 million), reflecting a solid operational pe</span>rformance, primarily linked to a better performance on the </span></span>incentive for inno<span class=\"_ _2\"></span>vation, customer satisfaction and influenceable costs and partially offset by lower incentive for interconn<span class=\"_ _e\"></span>ection capacity. Driven by the growth o<span class=\"_ _2\"></span>f the activities, the efficiency <span class=\"_ _e\"></span>gain on controllable costs slightly decreased compared with the previous <span class=\"_ _2\"></span>year, while the net contribution from incentives benefitted from a reduction in the average tax rate due to a higher innovation<span class=\"_ _2\"></span> income deduction.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Employe<span class=\"_ _2\"></span>e and other provisions<span class=\"ff3f\"> <span class=\"ff42\">(+\u20ac7.9 </span>million), mainly driven by higher contributions to plan assets. <span class=\"_ _e\"></span> </span></span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Higher<span class=\"_ _2\"></span> <span class=\"ff40\">capitalised borrowing costs</span> <span class=\"ff42\">due to a higher level of assets under construction (+\u20ac1.7 million).<span class=\"_ _e\"></span></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">A one-<span class=\"_ _2\"></span>off <span class=\"ff40\">tariff compensation</span> <span class=\"ff42\">for the financial costs linked to the capital increase (+\u20ac</span>3.6 <span class=\"_ _e\"></span>million). </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Regu<span class=\"_ _2\"></span>latory settlements<span class=\"ff3f\"> <span class=\"ff42\">and the reversal of provision for the influenceable incentive following the Saldi 2021 review (+\u20ac2.2 </span></span></span></span>million). \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Oth<span class=\"_ _2\"></span>er<span class=\"ff3f\"> (-<span class=\"ff42\">\u20ac3.0 million): this was primarily due to share</span>-base<span class=\"_ _e\"></span>d payment expenses linked to the capital increase in favour of members </span></span></span>of staff (-<span class=\"ff42\">\u20ac1.7 million),deferred tax <span class=\"_ _2\"></span>effects (<span class=\"ff3f\">-</span>\u20ac2.<span class=\"_ _e\"></span>4 million) and other restatements (<span class=\"ff3f\">-</span>\u20ac0.6 million), partially offset by the lower </span>depre<span class=\"_ _2\"></span>ciation of software and hardware (+\u20ac1.4 million) and less damage to electrical installations comp<span class=\"_ _e\"></span><span class=\"ff3f\">ared with the <span class=\"_ _e\"></span>previous year </span>(+\u20ac0.3 million)<span class=\"_ _2\"></span>.<span class=\"ff3f\"> </span>Total assets<span class=\"_ _2\"></span> <span class=\"ff3f\">increased by <span class=\"ff42\">\u20ac695.1</span> <span class=\"ff42\">million to \u20ac</span>7,848.6 million due to the realisation of the investment programme and higher liquidity. <span class=\"_ _e\"></span> </span>Net financ<span class=\"_ _2\"></span>ial debt <span class=\"ff42\">dropped to \u20ac<span class=\"ff3f\">2,916.2 million (-</span>15.3%<span class=\"_ _e\"></span>), as ETB\u2019s <span class=\"ff3f\">CAPE<span class=\"_ _e\"></span>X pro<span class=\"_ _2\"></span>gramme was fully financed by the proceeds from the </span></span>capital increase and by <span class=\"_ _2\"></span>cash flows from operating activitie<span class=\"_ _e\"></span>s, which were positively im<span class=\"_ _2\"></span>pacted by higher cash inflows from levi<span class=\"_ _e\"></span>es and the cap surp<span class=\"_ _2\"></span>lus paid by Nemo Link (\u20ac69.1 million, which need<span class=\"_ _e\"></span>s to<span class=\"ff3f\"> be returned to the tariffs). The sustainability-</span>linked R<span class=\"_ _e\"></span>CF (\u20ac650 million) and<span class=\"_ _2\"></span> the commercia<span class=\"_ _2\"></span>l paper (\u20ac300 million) were fully undrawn at the end of 2022. S&amp;P Global confirmed ETB\u2019s rating at BB<span class=\"_ _e\"></span>B+ with a s<span class=\"_ _e\"></span><span class=\"ff3f\">table </span>outlook a<span class=\"_ _2\"></span>t the end of 2022.<span class=\"_ _e\"></span> 4.3 <span class=\"_ _235\"> </span>50Hertz Trans<span class=\"_ _e\"></span>mission (Germ<span class=\"_ _2\"></span>any) The table be<span class=\"_ _2\"></span>low shows the 2022 consolidated results for 50Hertz Transmission (Germany) system operator activities in Germany.<span class=\"_ _e\"></span> Result<span class=\"_ _2\"></span>s 50Hertz Transmission (Germany) (in \u20ac million) \u2212 <span class=\"_ _e\"></span><span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span> Differen<span class=\"_ _2\"></span>ce (%) <span class=\"_ _e\"></span> period<span class=\"_ _2\"></span> ended 31 December Revenue, other income an<span class=\"_ _2\"></span>d net income (expense) fro<span class=\"ls8f\">m </span>2,592.7 1,716.9 50.9% settlement me<span class=\"_ _2\"></span>chanism<span class=\"_ _e\"></span> Revenues 2,222.4 1,569.9 41.6% Other in<span class=\"_ _2\"></span>come<span class=\"_ _e\"></span> 125.9 95.1 32.4% Net income<span class=\"_ _2\"></span> (expense) from settlement mechanism<span class=\"_ _e\"></span> 244.4 51.9 n.r. Depreciation, amortisa<span class=\"_ _2\"></span>tion, impairment and changes in (297.3) (261.2) 13.8% provisions  Results from operatin<span class=\"_ _2\"></span>g activities <span class=\"_ _e\"></span> 314.1 272.9 15.1% EBIT 314.1 272.9 15.1% EBITDA 611.5 534.0 14.5% Finance<span class=\"_ _2\"></span> income 73.9 2.1 3419.0<span class=\"_ _2\"></span>%<span class=\"_ _e\"></span> Finance<span class=\"_ _2\"></span> costs<span class=\"_ _e\"></span> (46.6) (36.9) 26.4% Income tax exp<span class=\"_ _2\"></span>enses<span class=\"_ _e\"></span> (105.3) (72.8) 44.6% Net prof<span class=\"_ _2\"></span>it<span class=\"_ _e\"></span> 236.1 165.4 42.7% Of which attributable to the Elia<span class=\"_ _2\"></span> Group<span class=\"_ _e\"></span> 188.9 132.3 42.8% Consolidated<span class=\"_ _2\"></span> statement of financial position  31 Decembe<span class=\"_ _2\"></span>r 2022<span class=\"_ _e\"></span> 31 Decembe<span class=\"_ _2\"></span>r 2021<span class=\"_ _e\"></span>  Differen<span class=\"_ _2\"></span>ce (%) <span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Total a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 11,638<span class=\"_ _2\"></span>.1<span class=\"_ _e\"></span> 9,941.3 17.1% Capital expenditures 1,135.9 880.4 29.0% Net financia<span class=\"_ _2\"></span>l debt<span class=\"_ _e\"></span> 1,255.3 1,014.9 23.7% 50Hertz Transmission\u2019s<span class=\"_ _2\"></span> total r<span class=\"ff40\">evenue<span class=\"ff3f\"> <span class=\"_ _e\"></span>and other income increased compared with 2021 (+51.0%). </span></span>Total revenues are deta<span class=\"_ _2\"></span>iled in the table below.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Difference (%) Grid revenue: 2,213.1 1,561.3 41.7%   <span class=\"ls0\"> Revenue from incentive regulation </span>862.7 911.8 (5.4%)   <span class=\"ls0\"> Revenue from offshore regu<span class=\"_ _2\"></span>lation<span class=\"_ _e\"></span> </span>295.1 294.7 0.1%   <span class=\"ls0\"> Energy revenue </span>1,055.4 354.9 197.4% Other revenue (in<span class=\"_ _2\"></span>cl. last mile connection)<span class=\"_ _e\"></span> 9.2 8.6 7.1% Subtotal r<span class=\"_ _2\"></span>evenue 2,222.4 1,569.9 41.6% Other in<span class=\"_ _2\"></span>come<span class=\"_ _e\"></span> 125.9 95.1 32.4% Net income<span class=\"_ _2\"></span> (expense) from settlement mechanism<span class=\"_ _e\"></span> 244.4 51.9 370.9% Total revenue and<span class=\"_ _2\"></span> other income<span class=\"_ _e\"></span> 2,592.6 1,716.9 51.0% Revenues f<span class=\"_ _2\"></span>rom incentive regulation <span class=\"ff3f\">co<span class=\"_ _e\"></span>nsist of grid tariffs before the settlement mechanism; the<span class=\"_ _2\"></span>y are primarily driven by the regulatory </span>remuneration for onshore activities (<span class=\"_ _2\"></span>revenue cap). <span class=\"_ _e\"></span> Revenues from<span class=\"_ _2\"></span> incentive regulation decreased by <span class=\"_ _e\"></span><span class=\"ff42\">\u20ac49.1</span> million, coming from lower volume effects than last year a<span class=\"_ _e\"></span>nd lower revenues from the re<span class=\"_ _2\"></span>venue cap. <span class=\"_ _e\"></span> The infeed o<span class=\"_ _2\"></span>f renewable energy into the distribution grid was higher than expected, leading to lower volumes <span class=\"_ _2\"></span>in th<span class=\"_ _e\"></span>e transmiss<span class=\"_ _e\"></span>ion grid. Consequently, the volume effe<span class=\"_ _2\"></span>ct was lower than in previo<span class=\"_ _e\"></span>us years (-<span class=\"ff42 ls5b\">\u20ac9</span>9.2 million). <span class=\"_ _e\"></span> The revenue cap decrease (-<span class=\"ff42\">\u20ac14.3</span> million) was ma<span class=\"_ _2\"></span>inly dri<span class=\"_ _e\"></span>ven by higher payba<span class=\"_ _2\"></span>cks for old regulatory balances via the regulatory account (-<span class=\"ff42\">\u20ac67<span class=\"_ _2\"></span>.3 million<span class=\"_ _e\"></span><span class=\"ff3f\">). Additionally, the pass-through energy costs for reserve power plants decreased compared to 2021 <span class=\"_ _e\"></span>(-</span>\u20ac14.7<span class=\"ff3f\"> million). </span></span>These effects <span class=\"_ _2\"></span>were partially compensated for by an increased allowance for onshore investments (<span class=\"_ _e\"></span><span class=\"ff42\">+\u20ac21.7</span> million) <span class=\"_ _e\"></span>as well as a h<span class=\"_ _2\"></span>igher cost allowance<span class=\"_ _2\"></span> for ancillary services (+\u20ac48.5<span class=\"ff3f\"> million). <span class=\"_ _e\"></span> </span>Furtherm<span class=\"_ _2\"></span>ore, there was no pass-through payback related <span class=\"_ _e\"></span>to the old regulatory offshore mechanism compared with last year (<span class=\"ff42\">+\u20ac64.5 </span>million).<span class=\"fc1d\"> </span>Revenues f<span class=\"_ _2\"></span>rom offshore surcharge <span class=\"ff3f\">includ<span class=\"_ _e\"></span>e all revenues derived<span class=\"_ _2\"></span> from the offshore grid surcharge. This includes regulatory </span>remuneration for the<span class=\"_ _2\"></span> connection of offshore wind farms, t<span class=\"_ _e\"></span>he reimbursement of off<span class=\"_ _2\"></span>shore liability payments and offshore costs charged to 50Hertz b<span class=\"_ _2\"></span>y third parties, e.g. other TSOs.<span class=\"_ _e\"></span> The o<span class=\"_ _2\"></span>ffshore surcharge revenues increased slightly compared with the previous year (+\u20ac0.4 million)<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>as the remuneration of 50Hertz\u2019s own offshore grid co<span class=\"_ _2\"></span>nnection costs increased (+\u20ac25.5 million), driven by ongoing offshore investments (Ostwind 2 and Ostwind <span class=\"ff3f\">3<span class=\"_ _e\"></span>). This </span>effect was offset b<span class=\"_ _2\"></span>y the decrease in the pass<span class=\"_ _e\"></span>-through costs charged to 50Hertz by third parties compared with 2021 (-<span class=\"ff42\">\u20ac25.1 million).<span class=\"_ _e\"></span></span><span class=\"fc1d\"> </span>Energy revenue<span class=\"_ _2\"></span>s<span class=\"ff3f\"> include all revenues related to system <span class=\"_ _e\"></span>opera<span class=\"_ _2\"></span>tions and are mostly corresponding costs charged on to third parties, </span>such as redispatch me<span class=\"_ _2\"></span>asures, costs for reserve power pla<span class=\"_ _e\"></span>nts or contro<span class=\"_ _2\"></span>l power cos<span class=\"_ _e\"></span>ts. Revenues generated from auctioning off interconnector capa<span class=\"_ _2\"></span>city are also included in this section.<span class=\"_ _e\"></span> Energy re<span class=\"_ _2\"></span>venues strongly increased compared to the previous year (+\u20ac700.5 million), due to the continuing rise in energy pric<span class=\"_ _e\"></span><span class=\"ff3f ls5b\">es<span class=\"ls1d\">. <span class=\"_ _e\"></span><span class=\"ls0\">The </span></span></span>control power c<span class=\"_ _2\"></span>osts cha<span class=\"_ _e\"></span>rged to balancing groups increased significantly (<span class=\"ff42\">+\u20ac386.0 million), as did the charges to other TSOs for </span>redispatch me<span class=\"_ _2\"></span>asures <span class=\"ff42\">(+\u20ac188.5 million). Furthermore, </span>rev<span class=\"_ _e\"></span>enues from the auctioning of interconnector capacities benefitted from price developments (+\u20ac<span class=\"ff3f\">77.9 million), as <span class=\"_ _2\"></span>well as <span class=\"ff42\">rev<span class=\"_ _e\"></span>enues from the compensation of involuntary exchanges at the grid\u2019s borders (+\u20ac<span class=\"_ _e\"></span>33.1 </span></span>million).  Other revenue<span class=\"_ _2\"></span>s<span class=\"ff3f\"> (including last-mile connection) increase<span class=\"_ _e\"></span>d (<span class=\"ff42\">+\u20ac0.5 million), mainly due to higher revenues re<span class=\"_ _2\"></span>ceived from the Inter<span class=\"_ _e\"></span><span class=\"ff3f\">-</span></span></span>Transmission System<span class=\"_ _2\"></span> Operator Compensation (ITC) mechanism. The ITC mechanism is based on an EU regulation and compensates TSOs for t<span class=\"_ _2\"></span>he costs of hosting cross-border electricity flows on their networks. TSOs contribute/receive funds based on electricity flows onto/from their n<span class=\"_ _2\"></span>ational transmission systems.<span class=\"_ _e\"></span> Other income<span class=\"ff3f\"> <span class=\"ff42\">rose (+\u20ac30.9 million), as a<span class=\"_ _2\"></span> result of higher own work capitalised following the increase in staffing to execute and manage </span></span>the investment <span class=\"_ _2\"></span>programme (+\u20ac18.3 million). Furthermore, other operating <span class=\"_ _e\"></span><span class=\"ff3f\">revenues increased (</span>+\u20ac9.1 <span class=\"ff3f\">million), including the capitalisation </span>of dismantling provisions <span class=\"_ _2\"></span>and higher charges for IT to third parties.<span class=\"_ _e\"></span><span class=\"fc1d\"> </span>The <span class=\"ff40\">net regulatory inco<span class=\"_ _2\"></span>me (expense) from settlement mechanism<span class=\"_ _e\"></span><span class=\"ff3f\"> neutralises regulatory time lags. It consists of two com<span class=\"_ _2\"></span>po<span class=\"_ _e\"></span>nents: </span></span>firstly, the neutralisation<span class=\"_ _2\"></span> of differences between cost allow<span class=\"_ _e\"></span>ances in the tar<span class=\"_ _2\"></span>iffs and the actual costs incurred for the curre<span class=\"_ _e\"></span><span class=\"ff42\">nt year (+\u20ac125.2 </span>million); se<span class=\"_ _2\"></span>condly, the balancing of said differences from prior years (+\u20ac119.1 million).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>EBITDA<span class=\"ff3f\"> increased to <span class=\"ff42\">\u20ac611.5 million (+14.5<span class=\"_ _2\"></span>%). The growing asset base benefitted the investment remuneration (+\u20ac77.6<span class=\"ff3f\"> <span class=\"_ _e\"></span>million). The </span></span></span>opex costs decreased a<span class=\"_ _2\"></span>s 50Hertz ramped down from a peak in the maintenance cycle while focussing on operational efficiency an<span class=\"ls5b\">d </span>safety, while a<span class=\"_ _2\"></span>lso benefitting from capitalised dismantling costs that were passed through under the offshore cost-<span class=\"_ _e\"></span>plus regulation (+\u20ac11.8 million). F<span class=\"_ _2\"></span>urthermore, the losses on asset disposal and trade debtors were reduced (+\u20ac5.6<span class=\"ff3f\"> million). In order to ensure the </span>energ<span class=\"_ _2\"></span>y transition is a success and manage the increasing complexity of system operations in the future, 50He<span class=\"_ _e\"></span>rtz continued to expand its talent pool, lea<span class=\"_ _2\"></span>ding to additional staffing costs (-<span class=\"ff42\">\u20ac16.3 mill<span class=\"_ _e\"></span>ion), </span>which was compensated for by the higher own work capitalised (<span class=\"ff42\">+\u20ac14.2 </span>million). Furthermore, <span class=\"_ _2\"></span>EBITDA benefited from one<span class=\"_ _e\"></span>-off revenues from the regulatory settlement and related provisions amounting to \u20ac23.4 million (<span class=\"ff3f\">-</span>\u20ac18.9 million). This se<span class=\"_ _2\"></span>ttlement was mainly <span class=\"_ _e\"></span>related<span class=\"_ _2\"></span> to an agreement on the offshore lump sum for the year 2018, while in 2021 it origina<span class=\"_ _2\"></span>ted from the refund of clawback amounts as part of the transition towards the Capital Cost Adjustment model in 2024.<span class=\"_ _e\"></span> There was a le<span class=\"_ _2\"></span>ss pronounced increase in <span class=\"ff40\">EBIT</span> <span class=\"ff42\">(+<span class=\"_ _e\"></span>\u20ac41.2 million) which was driven by increasing depreciations (</span>-<span class=\"ff42\">\u20ac37.3 million) following </span>the commissioning<span class=\"_ _2\"></span> of projects like Ostwind 2 (first cable system and Ar<span class=\"_ _e\"></span>cadis Ost 1 platform). Furthermore, operating provisions decrea<span class=\"_ _2\"></span>sed slightly compared with 2021 (<span class=\"ff42\">+<span class=\"_ _e\"></span>\u20ac1.1</span> million). No adjusted items occurred in <span class=\"ls5b\">2022</span>. The <span class=\"ff40\">net financia<span class=\"_ _2\"></span>l result <span class=\"ff42\">increased to \u20ac27.3 million (+\u20ac62<span class=\"_ _e\"></span>.0 million), <span class=\"ff3f\">driven primarily by the revaluation of provision for congestion </span></span></span>income from in<span class=\"_ _2\"></span>terconnectors to be returned to grid customers based on the strong upwards revision of the interest forward curve<span class=\"_ _e\"></span> amoun<span class=\"_ _2\"></span>ting to \u20ac67.5 million in 2022 (+\u20ac63.1 million compared to 2021).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Net prof<span class=\"_ _2\"></span>it<span class=\"ff3f\"> increased <span class=\"ff42\">to \u20ac236.1 million</span> (<span class=\"_ _e\"></span>+42.7%) as a result of: </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff42 fc3\">Higher<span class=\"_ _2\"></span> investment remuneration (+\u20ac54.4 million) following the growth of the asset base.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff42 fc3\">Higher<span class=\"_ _2\"></span> financial results (+\u20ac43.4 million), driven primarily by the re<span class=\"_ _2\"></span>valuation of long<span class=\"_ _e\"></span><span class=\"ff3f\">-term provisions. <span class=\"_ _e\"></span> </span></span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Decrea<span class=\"_ _2\"></span>sed <span class=\"ff42\">OPEX and other costs (+\u20ac12.3 million).</span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span>se effects were partially offset by: </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Higher<span class=\"_ _2\"></span> depreciations (-<span class=\"ff42\">\u20ac26.1 million) due to the commissioning of projects.<span class=\"_ _e\"></span></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Lower<span class=\"_ _2\"></span> regulatory settlement prior years (-<span class=\"ff42\">\u20ac13.2 million).</span> </span></span>Total assets<span class=\"_ _2\"></span> <span class=\"ff3f\">rose by <span class=\"ff42\">\u20ac1,696.8</span> million compar<span class=\"_ _e\"></span>ed with 2021, mainly due to a favorable development of the <span class=\"ff42\">EEG business (+\u20ac826.0 </span></span>million) and the<span class=\"_ _2\"></span> execution of the investment programme (\u20ac1,085.5 million). The <span class=\"ff40\">free cash flow<span class=\"ff3f\"> totalled -</span></span>\u20ac<span class=\"_ _e\"></span>359.2 million<span class=\"ff3f\"> and wa<span class=\"_ _2\"></span>s heavily </span>affected<span class=\"_ _2\"></span> by the high investment programme as well as the time<span class=\"_ _e\"></span>-lag in recovering the high energy costs. The cash flow on the EEG account only partially com<span class=\"_ _2\"></span>pensated for these effects (<span class=\"ff42\">+<span class=\"_ _e\"></span>\u20ac826.0</span> million). The parliament decided to reduce the EEG surcharge to zero as of 1 July 2022 in<span class=\"_ _2\"></span> order to relieve households and companies given increased electricity costs. In <span class=\"_ _e\"></span>future, the costs for promoting<span class=\"_ _2\"></span> RES will be finan<span class=\"_ _2\"></span>ced through the Energy and Climate Fund. 50Hertz will continue to act as a trustee.<span class=\"_ _e\"></span><span class=\"fc1d\"> </span>The <span class=\"ff40\">net financia<span class=\"_ _2\"></span>l debt<span class=\"ff3f\"> increased <span class=\"ff42\">by \u20ac240.4</span> million comp<span class=\"_ _e\"></span>ared with end of 2021, as the realisation of the investment programme was </span></span>partially financed by existing<span class=\"_ _2\"></span> liquidity, while the operating cash flow was negatively impacted by high energy costs. The EEG<span class=\"_ _e\"></span> cash inflow from h<span class=\"_ _2\"></span>igher energy prices only partially compensated for these effects. The EEG cash position as of December<span class=\"_ _e\"></span> 2022 amounted to \u20ac2,936<span class=\"_ _2\"></span>.0<span class=\"ff3f\"> </span>million. 50Hertz issued a second green bond of \u20ac750 million at the beginning of September with a tenor of 9 years and a fixed<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>rate o<span class=\"_ _2\"></span>f 3.28%, leading to an average cost of debt of 1.5% at the end of December 2022.<span class=\"_ _e\"></span><span class=\"fc1d\"> </span>4.4 <span class=\"_ _235\"> </span>Non-<span class=\"_ _e\"></span>regulated activities and Nem<span class=\"_ _2\"></span>o Link The table be<span class=\"_ _2\"></span>low shows the 2022 consolidated results for <span class=\"ff42\">t<span class=\"_ _e\"></span>he \u2018Non</span>-<span class=\"ff42\">regulated act<span class=\"_ _2\"></span>ivities and Nemo Link\u2019 segment<span class=\"ff3f\">.<span class=\"_ _e\"></span> </span></span>Result<span class=\"_ _2\"></span>s Non-regulated activities and Nemo Link <span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span> Differen<span class=\"_ _2\"></span>ce (%) <span class=\"_ _e\"></span> (in \u20ac million) \u2212 <span class=\"ff40\"> </span>period<span class=\"_ _2\"></span> ended 31 December Total revenues 5.9 28.7 (79.4%) Other in<span class=\"_ _2\"></span>come<span class=\"_ _e\"></span> 38.9 8.1 377.3% Depreciation, amortisa<span class=\"_ _2\"></span>tion, impairment and changes in (0.7) (0.5) 36.3% provisions  Results from operatin<span class=\"_ _2\"></span>g activities <span class=\"_ _e\"></span> (13.6) (6.8) 99.3% Share of profit<span class=\"_ _2\"></span> of equity accounted investees (net of income 37.1 47.1 (21.2%) tax) EBIT 23.6 40.3 (41.4%) EBITDA 24.3 40.8 (40.4%) Finance<span class=\"_ _2\"></span> income 3.8 0.1 3700.0<span class=\"_ _2\"></span>%<span class=\"_ _e\"></span> Finance<span class=\"_ _2\"></span> costs<span class=\"_ _e\"></span> (12.5) (9.0) 39.4% Income tax exp<span class=\"_ _2\"></span>enses<span class=\"_ _e\"></span> 0.4 0.5 (24.1%) Net prof<span class=\"_ _2\"></span>it<span class=\"_ _e\"></span> 15.2 31.9 (52.4%) Of which attributable to the Elia<span class=\"_ _2\"></span> Group<span class=\"_ _e\"></span> 15.2 31.9 (52.4%) Consolidated<span class=\"_ _2\"></span> statement of financial position  31 Decembe<span class=\"_ _2\"></span>r 2022<span class=\"_ _e\"></span> 31 Decembe<span class=\"_ _2\"></span>r 2021<span class=\"_ _e\"></span>  Differen<span class=\"_ _2\"></span>ce (%) <span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Total a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 1,946.5 1,654.0 17.7% Capital expenditures 0.9 1.6 (43.8%) Net financia<span class=\"_ _2\"></span>l debt<span class=\"_ _e\"></span> 260.1 430.4 (39.6%) Non-regulated revenue<span class=\"ff3f\"> increased by 21.5% <span class=\"ff42\">to \u20ac</span>44.7 million compared to 2021. This is the<span class=\"_ _2\"></span> result of high<span class=\"_ _e\"></span>er intersegment transactions </span>mainly between Elia Group SA, Elia T<span class=\"_ _2\"></span>ransmission Belgium and 50Hertz and partially offset by <span class=\"_ _e\"></span>lower revenues generated by Elia Grid Internationa<span class=\"_ _2\"></span>l (\u2018EGI\u2019) (<span class=\"ff3f\">-</span>\u20ac4.2 million), as prior year\u2019s revenu<span class=\"_ _e\"></span>es bene<span class=\"_ _2\"></span>fited from the commission<span class=\"ff3f\">i<span class=\"_ _e\"></span>ng of a turnkey project, while the </span>interna<span class=\"_ _2\"></span>tional consulting business is slowly increasing as a result of the pandemic revival. The effect of these intersegment t<span class=\"_ _e\"></span>ransactions is disclosed in \u2018Note 2.2<span class=\"_ _2\"></span>. Segment reconciliation\u2019.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Equity-accounted in<span class=\"_ _2\"></span>vestments<span class=\"ff3f\"> <span class=\"ff42\">contributed \u20ac37.1 millio<span class=\"_ _e\"></span>n to the Group\u2019s result, which is a<span class=\"_ _2\"></span>lmost entirely attributabl<span class=\"_ _e\"></span>e to <span class=\"ff40\">Nemo <span class=\"_ _e\"></span>Link<span class=\"ff3f\">. With </span></span></span></span>an availab<span class=\"_ _2\"></span>ility rate of 99.1%, Nemo Link remains one of the highest performing assets of its kind in the world. <span class=\"_ _e\"></span> In 2022<span class=\"ff42\">, geopolitical tensions put pressur<span class=\"_ _2\"></span>e on electricity markets, especially across the European continent because of the region\u2019s<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>dependence on Russian gas. This pressure was in<span class=\"_ _2\"></span>creased by the historically low level of nuclear availability in France. The s<span class=\"_ _e\"></span>pot N<span class=\"ls27\">BP </span>gas, which drives the UK electr<span class=\"_ _2\"></span>icity price, was traded fro<span class=\"_ _e\"></span>m May to October with a significa<span class=\"_ _2\"></span>nt discount compared to TTF gas, t<span class=\"_ _e\"></span><span class=\"ls5b\">he </span>reference gas pr<span class=\"_ _2\"></span>ice in Europe. This was because Great Brittan was better supplied by gas compared to the continent. As a resu<span class=\"_ _e\"></span>lt, Nemo Link was use<span class=\"_ _2\"></span>d very frequently for exports towards Belgium; it demonstrated its value to Belgian consumers by providing them with electricity at <span class=\"_ _2\"></span>lower prices to help with the energy crisis. Th<span class=\"_ _e\"></span>e Nemo L<span class=\"_ _2\"></span>ink interconnector highlights the importance of <span class=\"_ _e\"></span>similar links in providing<span class=\"_ _2\"></span> Belgium with access to energy that is produced <span class=\"_ _e\"></span>outside o<span class=\"_ _2\"></span>f the country whilst contributing to the functioning of com<span class=\"_ _e\"></span>petitive interna<span class=\"_ _2\"></span>tional market operations. This exceptional situation<span class=\"_ _2\"></span> during 2022 led to revenues of N<span class=\"_ _e\"></span>emo Lin<span class=\"_ _2\"></span>k amo<span class=\"ff42\">u<span class=\"_ _e\"></span>nting to \u20ac282.6 million, so exceeding (for the first time since it </span>began operating) the cumula<span class=\"_ _2\"></span>tive revenue cap by \u20ac137.6 <span class=\"_ _e\"></span>million. Its to<span class=\"_ _2\"></span>tal net profit reached \u20ac74.2 million for 2022, with a co<span class=\"_ _e\"></span><span class=\"ff3f\">nt<span class=\"_ _e\"></span>ribution to </span>Elia Group\u2019s n<span class=\"_ _2\"></span>et profit amounting to \u20ac37.1 millio<span class=\"_ _e\"></span><span class=\"ff3f ls5b\">n.<span class=\"ls0\"> </span></span>EBIT <span class=\"ff3f\">dropped to <span class=\"ff42\">\u20ac23.6</span> million (-<span class=\"ff42\">\u20ac16.7million). This decrease was primarily due to the lower con<span class=\"_ _2\"></span>tribution from Nemo Link (<span class=\"ff3f\">-<span class=\"_ _e\"></span></span>\u20ac9.9 million) </span></span>and the higher opera<span class=\"_ _2\"></span>ting costs for the holding and WindGrid driven by the pursuit of inorganic growth ambitions (<span class=\"_ _e\"></span>-<span class=\"ff42 ls78\">\u20ac6</span>.7<span class=\"_ _2\"></span> million). Following the drop in revenues, the contributio<span class=\"_ _2\"></span>n from EGI (-<span class=\"_ _e\"></span><span class=\"ff42\">\u20ac0.6 million) and re<span class=\"_ _2\"></span>.alto (<span class=\"_ _e\"></span><span class=\"ff3f\">-</span>\u20ac0.4 million) decreased.<span class=\"ff3f\"> </span></span>Net finance cost<span class=\"ff3f\"> <span class=\"ff42\">remained flat at \u20ac</span>8.8 <span class=\"ff42\">million, primarily comprising the interest cost linked to the sen<span class=\"_ _2\"></span>ior bond (\u20ac4.7 million), <span class=\"_ _e\"></span><span class=\"ff3f\">the cost </span></span></span>linked to t<span class=\"_ _2\"></span>he Nemo Link private placement (\u20ac2.9 million) and other financial costs linked to Elia Group SA. The pro<span class=\"ff3f\">-<span class=\"_ _e\"></span>rata costs linked to </span>the capita<span class=\"_ _2\"></span>l increase of Elia Group and allocated to Elia Group SA and Eurogrid International respectively are dir<span class=\"_ _e\"></span>ectly recognised in equity under IFRS (\u20ac3<span class=\"_ _2\"></span>.5 million).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Net prof<span class=\"_ _2\"></span>it<span class=\"ff3f\"> decreased by <span class=\"ff42\">\u20ac16.7</span> <span class=\"ff42\">million to \u20ac15.2 million, ma<span class=\"_ _e\"></span>inly as a re<span class=\"_ _2\"></span>sult of:<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Lower<span class=\"_ _2\"></span> contribution from Nemo Link (-<span class=\"ff42\">\u20ac9.9 million).<span class=\"_ _e\"></span></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Higher<span class=\"_ _2\"></span> costs driven by the establishment of WindGrid and business development activities (-<span class=\"ff42\">\u20ac6.9 million).</span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Lower<span class=\"_ _2\"></span> contribution from re.alto (-<span class=\"ff42\">\u20ac0.6 million).<span class=\"_ _e\"></span></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff42 fc3\">Other<span class=\"_ _2\"></span> items (+\u20ac0.7 million) driven by lower regulatory rejections (+\u20ac0.1 million), lo<span class=\"_ _2\"></span>wer other non<span class=\"_ _e\"></span><span class=\"ff3f\">-<span class=\"_ _e\"></span></span>regulated costs (+\u20ac0.8 million) </span></span>and partially off<span class=\"_ _2\"></span>set by a lower contribution from EGI (-<span class=\"ff42\">\u20ac0.<span class=\"_ _e\"></span>2 million).</span> Total assets<span class=\"_ _2\"></span> <span class=\"ff3f\">increased by 17.7%, <span class=\"ff42\">amounting to \u20ac</span>1,94<span class=\"_ _e\"></span>6.5 million (<span class=\"ff42\">+\u20ac292.5</span> million), primarily driven by the net proceeds from the capital </span>increase allocate<span class=\"_ _2\"></span>d to the non-regulated segment (<span class=\"ff42\">+\u20ac9<span class=\"_ _e\"></span>8.8 million) and divide</span>nd payments from subsidiaries offset by the payment of last year\u2019s dividend (<span class=\"ff3f\">-</span>\u20ac120.3 million). This led t<span class=\"_ _2\"></span>o a drop in net financial debt of <span class=\"_ _e\"></span>\u20ac170.3 <span class=\"ff3f\">million to </span>\u20ac260.1 <span class=\"ff3f\">million. </span>4.5 <span class=\"_ _235\"> </span>Recon<span class=\"_ _e\"></span>ciliation of inf<span class=\"_ _2\"></span>ormation on reportable segments to IFRS <span class=\"_ _e\"></span>amounts Consolidated<span class=\"_ _2\"></span> results (in \u20ac million) \u2212 <span class=\"_ _e\"></span><span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>period<span class=\"_ _2\"></span> ended 31 December Elia  50Hertz  Non-Consolidation<span class=\"_ _2\"></span>  Elia Group Transmission  Transmission  regulated entries &amp;  activities and<span class=\"_ _2\"></span> intersegment  Nemo Link transact<span class=\"_ _2\"></span>ions<span class=\"_ _e\"></span> ( a ) ( b ) ( c ) ( d ) ( a ) + ( b<span class=\"_ _2\"></span> ) + ( c ) +<span class=\"_ _2\"></span> ( d )<span class=\"_ _e\"></span> Revenue 1,420.4 2,222.4 5.9 (32.7) 3,616.0 Other in<span class=\"_ _2\"></span>come<span class=\"_ _e\"></span> 147.6 125.9 38.9 (52.7) 259.6 Net income<span class=\"_ _2\"></span> (expense) from <span class=\"_ _e\"></span> (6.7) 244.4 0.0 0.0 237.7 settlement me<span class=\"_ _2\"></span>chanism  Depreciation, amortisa<span class=\"_ _2\"></span>tion, impairment and changes in (214.4) (297.3) (0.7) 0.0 (512.4) provisions  Result<span class=\"_ _2\"></span>s from operating activities <span class=\"_ _e\"></span> 259.6 314.1 (13.6) (0.3) 559.8 Share of profit<span class=\"_ _2\"></span> of equity accounted investees, <span class=\"_ _e\"></span> 2.4 0.0 37.1 0.0 39.5 net of tax Earnings b<span class=\"_ _2\"></span>efore interest and tax (EBIT)<span class=\"_ _e\"></span> 262.0 314.1 23.6 (0.3) 599.4 Earnings b<span class=\"_ _2\"></span>efore depreciation, amortisation, interest 476.4 611.5 24.3 (0.3) 1,111.8 and tax (EBITDA) Finance<span class=\"_ _2\"></span> income 1.3 73.9 3.8 (3.6) 75.4 Finance<span class=\"_ _2\"></span> costs<span class=\"_ _e\"></span> (63.7) (46.6) (12.5) 3.9 (119.0) Income tax exp<span class=\"_ _2\"></span>enses<span class=\"_ _e\"></span> (42.7) (105.3) 0.4 0.0 (147.5) Profit att<span class=\"_ _2\"></span>ributable to the owners of the company<span class=\"_ _e\"></span> 156.9 188.9 15.2 0.0 361.0 Consolidated<span class=\"_ _2\"></span> statement of financial position  31.12.2022 31.12.2022 31.12.2022 31.12.2022 31.12.2022 (in \u20ac million)<span class=\"ff40\"> </span>Total a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 7,848.6 11,638<span class=\"_ _2\"></span>.1<span class=\"_ _e\"></span> 1,946.5 (838.9) 20,594<span class=\"_ _2\"></span>.3<span class=\"_ _e\"></span> Capital expenditures 449.0 1,135.9 0.9 0.0 1,585.8 Net financia<span class=\"_ _2\"></span>l debt<span class=\"_ _e\"></span> 2,916.2 1,255.3 260.1 0.0 4,431.6 Consolidated<span class=\"_ _2\"></span> results (in \u20ac million) \u2212 <span class=\"_ _e\"></span><span class=\"ff40\"> </span>2021<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Year ended 31<span class=\"_ _2\"></span> December<span class=\"_ _e\"></span> Elia  50Hertz  Non-Consolidation<span class=\"_ _2\"></span> Elia Group Transmission  Transmission  regulated entries &amp; activities and<span class=\"_ _2\"></span> intersegment Nemo Link transact<span class=\"_ _2\"></span>ions<span class=\"_ _e\"></span> ( a ) ( b ) ( c ) ( d ) ( a ) + ( b<span class=\"_ _2\"></span> ) + ( c ) +<span class=\"_ _2\"></span> ( d )<span class=\"_ _e\"></span> Revenue 1,009.8 1,569.9 28.7 (57.1) 2,551.2 Other in<span class=\"_ _2\"></span>come<span class=\"_ _e\"></span> 68.3 95.1 8.1 (36.4) 135.1 Net income<span class=\"_ _2\"></span> (expense) from <span class=\"_ _e\"></span> 121.4 51.9 0.0 0.0 173.3 settlement me<span class=\"_ _2\"></span>chanism  Depreciation, amortisa<span class=\"_ _2\"></span>tion, impairment and changes in (205.1) (261.2) (0.5) 0.0 (466.8) provisions  Result<span class=\"_ _2\"></span>s from operating activities <span class=\"_ _e\"></span> 224.8 272.9 (6.8) (0.2) 490.7 Share of profit<span class=\"_ _2\"></span> of equity accounted investees, <span class=\"_ _e\"></span> 2.3 0.0 47.1 0.0 49.3 net of tax Earnings b<span class=\"_ _2\"></span>efore interest and tax (EBIT)<span class=\"_ _e\"></span> 227.1 272.9 40.3 (0.2) 540.1 Earnings b<span class=\"_ _2\"></span>efore depreciation, amortisation, interest 432.2 534.0 40.8 (0.2) 1,006.9 and tax (EBITDA) Finance<span class=\"_ _2\"></span> income 1.7 2.1 0.1 0.0 3.9 Finance<span class=\"_ _2\"></span> costs<span class=\"_ _e\"></span> (64.8) (36.9) (9.0) 0.2 (110.5) Income tax exp<span class=\"_ _2\"></span>enses<span class=\"_ _e\"></span> (32.9) (72.8) 0.5 0.0 (105.1) Profit att<span class=\"_ _2\"></span>ributable to the owners of the company<span class=\"_ _e\"></span> 131.0 132.3 31.9 0.0 295.2 Consolidated<span class=\"_ _2\"></span> statement of financial position 31.12.2021 31.12.2021 31.12.2021 31.12.2021 31.12.2021 (in \u20ac million)<span class=\"ff40\"> </span>Total a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 7,153.5 9,941.3 1,654.0 (604.4) 18,144<span class=\"_ _2\"></span>.4<span class=\"_ _e\"></span> Capital expenditures 417.2 880.4 1.6 0.0 1,299.2 Net financia<span class=\"_ _2\"></span>l debt<span class=\"_ _e\"></span> 3,441.0 1,014.9 430.4 0.0 4,886.3 There are no significant <span class=\"_ _2\"></span>intersegment transactions.<span class=\"_ _e\"></span> The Group has no concentra<span class=\"_ _2\"></span>tion of customers in either of the operating segments.<span class=\"_ _e\"></span> 4.6 <span class=\"_ _235\"> </span>Adjus<span class=\"_ _e\"></span>ted items <span class=\"ff43\">\u2013</span> reconciliation table  N/A",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEntitysReportableSegmentsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__209": {
   "value": "4.1 <span class=\"_ _148\"> </span>Basis for segment reporting The group<span class=\"_ _2\"></span> has opted for segment reporting, in conformity <span class=\"_ _e\"></span>with the different regulatory frameworks that currently exi<span class=\"_ _e\"></span>st within the group. This reporting approach closely reflects the g<span class=\"ff42\">roup\u2019s operational activitie<span class=\"_ _2\"></span>s and<span class=\"ff3f\"> is also in line with the g<span class=\"_ _e\"></span></span>roup\u2019s internal reporting to the </span>Chief Operating De<span class=\"_ _2\"></span>cision Maker (CODM), e<span class=\"_ _e\"></span>nabling the CODM to better evaluate and assess the g<span class=\"ff42\">roup\u2019s performance and a</span>ctivities in a transparent <span class=\"_ _2\"></span>way.<span class=\"_ _e\"></span> Pursuant to IF<span class=\"_ _2\"></span>RS 8, the group has identified the following <span class=\"_ _e\"></span>opera<span class=\"_ _2\"></span>ting segments based on the aforementioned criteria:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Elia Tra<span class=\"_ _2\"></span>nsmission (Belgium), which comprises the activities based undertaken in line with <span class=\"_ _e\"></span>the Belgian regulatory framework:<span class=\"_ _2\"></span> the </span></span>regulated act<span class=\"_ _2\"></span>ivities of Elia Transmission Belgium SA/NV<span class=\"_ _e\"></span>, El<span class=\"_ _e\"></span>ia Asset SA/NV, Elia Engineering SA/NV, Elia Re SA, HGRT SAS and Coreso SA/NV, whose act<span class=\"_ _2\"></span>ivities are directly linked to the role of the Belgian transmission system operator and are<span class=\"_ _e\"></span> subject to the regulatory frame<span class=\"_ _2\"></span>work applicable in Belgium <span class=\"ff42\">\u2013</span> s<span class=\"_ _e\"></span>ee Section 9.1.3. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">50Her<span class=\"_ _2\"></span>tz Transmission (Germany), which comprises the activities undertaken in line with the German regulatory framework: </span></span>Eurogrid GmbH, 50Hertz<span class=\"_ _2\"></span> Transmission GmbH and 50Hertz Offshore GmbH, whos<span class=\"_ _e\"></span>e activities are directly linked to the role of the transmission system<span class=\"_ _2\"></span> operator in Germany <span class=\"_ _e\"></span><span class=\"ff42\">\u2013</span> see Section 9.2.3. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Non-r<span class=\"_ _2\"></span>egulated activities and Nemo Link, comprising<span class=\"ls1d\">: <span class=\"_ _e\"></span></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Elia Group NV/SA, mainly consisting of the holding activities in the Elia Transmission (Belgium) <span class=\"ls5b\">and </span>5<span class=\"_ _e\"></span>0Hertz Transmission </span></span>(Germany) segment<span class=\"ls1d\">; </span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Eurogrid International NV/SA; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">the h<span class=\"_ _e\"></span>olding <span class=\"_ _e\"></span>activities in<span class=\"_ _e\"></span> Nem<span class=\"_ _e\"></span>o Link <span class=\"_ _e\"></span>Lt<span class=\"_ _e\"></span>d. <span class=\"_ _e\"></span>This co<span class=\"_ _e\"></span>mpany co<span class=\"_ _e\"></span>mprises and<span class=\"_ _e\"></span> manages <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>Nemo <span class=\"_ _e\"></span>project, w<span class=\"_ _e\"></span>hich <span class=\"_ _e\"></span>connects <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>UK<span class=\"_ _e\"></span> </span></span>and <span class=\"_ _4b\"></span>Belgium <span class=\"_ _2\"></span>using <span class=\"_ _2\"></span>high-voltage e<span class=\"_ _2\"></span>lectricity <span class=\"_ _4b\"></span>c<span class=\"_ _e\"></span>ables, <span class=\"_ _2\"></span>enab<span class=\"_ _2\"></span>lin<span class=\"_ _e\"></span>g <span class=\"_ _2\"></span>power <span class=\"_ _4b\"></span>to<span class=\"_ _e\"></span> <span class=\"_ _2\"></span>be <span class=\"_ _4b\"></span>excha<span class=\"_ _e\"></span>nged <span class=\"_ _2\"></span>between <span class=\"_ _4b\"></span>the <span class=\"_ _2\"></span>two <span class=\"_ _2\"></span>countries <span class=\"_ _2\"></span>and <span class=\"_ _4b\"></span>f<span class=\"_ _e\"></span>or <span class=\"_ _4b\"></span>which<span class=\"_ _e\"></span> a specific regulatory framework ha<span class=\"_ _2\"></span>s been set up <span class=\"ff42\">\u2013</span> see Se<span class=\"_ _e\"></span>ction 9.3 for more<span class=\"_ _2\"></span> details;<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">the non-regulated activities <span class=\"ls5b\">of</span> t<span class=\"_ _e\"></span>he Elia Transmission (Belgi<span class=\"_ _e\"></span>um) segmen<span class=\"_ _2\"></span>t<span class=\"_ _e\"></span><span class=\"ls1d\">. </span><span class=\"ff42\">\u2019</span>N<span class=\"ls5b\">on</span>-<span class=\"_ _e\"></span>regulated activities<span class=\"ff42 ls1c\">\u2019 </span>refers to activities which<span class=\"_ _e\"></span> </span></span>are not dire<span class=\"_ _2\"></span>ctly related to the role of <span class=\"ls5b\">a <span class=\"_ _e\"></span></span>TSO <span class=\"ff42\">\u2013</span> see Section 9.1;<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">EGI <span class=\"_ _2\"></span>(Elia <span class=\"_ _4b\"></span>Grid <span class=\"_ _2\"></span>Inter<span class=\"_ _2\"></span>national <span class=\"_ _4b\"></span>NV/S<span class=\"_ _e\"></span>A, <span class=\"_ _4b\"></span>E<span class=\"_ _e\"></span>lia <span class=\"_ _4b\"></span>Grid <span class=\"_ _2\"></span>Intern<span class=\"_ _2\"></span>ational <span class=\"_ _4b\"></span>GmbH<span class=\"_ _e\"></span><span class=\"ls1d\">, <span class=\"_ _2\"></span><span class=\"ls0\">Elia <span class=\"_ _4b\"></span>Grid <span class=\"_ _2\"></span>Inte<span class=\"_ _2\"></span>rnational <span class=\"_ _4b\"></span>P<span class=\"_ _e\"></span>te. <span class=\"_ _4b\"></span>Ltd Singa<span class=\"_ _2\"></span>pore <span class=\"_ _4b\"></span>(closed <span class=\"_ _2\"></span>in <span class=\"_ _2\"></span>2022<span class=\"_ _2\"></span>),<span class=\"_ _e\"></span> </span></span></span></span>Elia <span class=\"_ _e\"></span>Grid <span class=\"_ _e\"></span>International <span class=\"_ _20\"></span>LLC <span class=\"_ _e\"></span>Saudi <span class=\"_ _20\"></span>Arabia <span class=\"_ _e\"></span>and<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>Elia <span class=\"_ _20\"></span>Grid<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>International Inc<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>Cana<span class=\"_ _e\"></span>da <span class=\"_ _e\"></span>(<span class=\"_ _e\"></span><span class=\"ls5b\">a <span class=\"_ _20\"></span></span>new <span class=\"_ _e\"></span>subsidiary <span class=\"_ _e\"></span>inc<span class=\"_ _e\"></span>orporated <span class=\"_ _e\"></span>in<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>2022<span class=\"_ _e\"></span>)<span class=\"ls95\">, </span>which <span class=\"_ _24d\"> </span>are <span class=\"_ _57\"> </span>companies <span class=\"_ _57\"> </span>that <span class=\"_ _57\"> </span>s<span class=\"_ _e\"></span>upply <span class=\"_ _24d\"> </span>speci<span class=\"_ _e\"></span>alists <span class=\"_ _57\"> </span>in <span class=\"_ _24d\"> </span>consulti<span class=\"_ _e\"></span>ng, <span class=\"_ _24d\"> </span>services, <span class=\"_ _57\"> </span>engin<span class=\"_ _e\"></span>eering <span class=\"_ _24d\"> </span>and <span class=\"_ _7c\"> </span>pr<span class=\"_ _2\"></span>ocurement, <span class=\"_ _24d\"> </span>cr<span class=\"_ _e\"></span>eating <span class=\"_ _24d\"> </span>v<span class=\"_ _e\"></span>alue <span class=\"_ _24d\"> </span>b<span class=\"_ _e\"></span>y<span class=\"_ _e\"></span> delivering<span class=\"_ _2\"></span> solutions based on international best practice w<span class=\"_ _e\"></span>hile fully complying with regulated business environments; o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Re.Alto-Energy <span class=\"_ _e\"></span>BV/SRL <span class=\"_ _20\"></span>and Re.Alto-Energy <span class=\"_ _e\"></span>GmbH, <span class=\"_ _e\"></span>a <span class=\"_ _20\"></span>start-up f<span class=\"_ _e\"></span>ounded <span class=\"_ _e\"></span>in <span class=\"_ _e\"></span>August <span class=\"_ _e\"></span>2019 <span class=\"_ _20\"></span>which <span class=\"_ _e\"></span>is <span class=\"_ _e\"></span>the <span class=\"_ _e\"></span>first <span class=\"_ _e\"></span>E<span class=\"_ _e\"></span>uropean <span class=\"_ _e\"></span>digital </span></span>marketp<span class=\"_ _2\"></span>lace for energy data and services;<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Windgrid, <span class=\"_ _e\"></span>a <span class=\"_ _20\"></span>new <span class=\"_ _20\"></span>entity <span class=\"_ _e\"></span>created <span class=\"_ _20\"></span>during <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>he <span class=\"_ _e\"></span>reporting <span class=\"_ _20\"></span>period <span class=\"_ _e\"></span>20<span class=\"_ _e\"></span>22, <span class=\"_ _e\"></span>w<span class=\"_ _e\"></span>hich <span class=\"_ _e\"></span>was<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>est<span class=\"_ _e\"></span>ablished <span class=\"_ _20\"></span>to <span class=\"_ _e\"></span>manage <span class=\"_ _20\"></span>expected <span class=\"_ _e\"></span>increase <span class=\"_ _e\"></span>in<span class=\"_ _20\"></span> </span></span>investmen<span class=\"_ _2\"></span>ts in renewable energy production and the offshore grid exp<span class=\"_ _e\"></span>ansion. The CODM has been identified<span class=\"_ _2\"></span> by the group as t<span class=\"_ _e\"></span>he Boards of Directors, CEOs and Management Committees of ea<span class=\"_ _e\"></span>ch segment. The CODM periodically re<span class=\"_ _2\"></span>views the performance of the gr<span class=\"_ _e\"></span>oup's segments using various indicators such as revenue, EBITDA and operating profit. The information presented to the CODM follows the group's IFRS accounting policies, so no reconciling items have to be disclosed.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForSegmentReportingExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__28": {
   "value": "5.1. <span class=\"_ _87\"> </span>Revenue, net income (expense) from settlement mechanism and other income (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Revenue, e<span class=\"_ _2\"></span>xcluding net income from settlement mechanism<span class=\"_ _e\"></span> 3,853.7 2,724.6   <span class=\"ls0\">Grid re<span class=\"_ _2\"></span>venue:<span class=\"_ _e\"></span> </span>3,837.0 2,711.1   <span class=\"ls0\">Last mile connect<span class=\"_ _2\"></span>ion<span class=\"_ _e\"></span> </span>5.1 4.3   <span class=\"ls0\">Other revenue </span>11.6 9.3 Net income (expense) from settle<span class=\"_ _2\"></span>ment mechanism<span class=\"_ _e\"></span> 237.7 173.3 Other income 259.6 135.1   <span class=\"ls0\">Services and techn<span class=\"_ _2\"></span>ical expertise<span class=\"_ _e\"></span> </span>(0.8) (2.2)   <span class=\"ls0\">Own production </span>107.0 82.1   <span class=\"ls0\">Optimal use of a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> </span>16.2 15.8   <span class=\"ls0\">Other </span>136.6 37.8   <span class=\"ls0\">Gain on sale PPE </span>0.7 1.5 We refer<span class=\"_ _2\"></span> to the segment reports for a detailed analysis of the g<span class=\"ff42\">roup\u2019s recognised revenues at segment level. The El<span class=\"_ _e\"></span>ia Tran<span class=\"_ _2\"></span>smission </span>(Belgium) segment r<span class=\"_ _2\"></span>eported revenues and othe<span class=\"_ _e\"></span>r income <span class=\"ff42\">of \u20ac</span>1,561.3 million (Note 4.2), the 50Hertz Transmission (Germany) segment repor<span class=\"_ _2\"></span>ted revenues and other income <span class=\"ff42\">of \u20ac</span>2,5<span class=\"_ _e\"></span>92.6 million (Note <span class=\"ff42\">4.3) and the \u2018Non</span>-<span class=\"ff42\">regulated activities and Nemo Link\u2019 segmen<span class=\"_ _2\"></span>t reported </span>revenues and other income <span class=\"ff42\">of \u20ac44.7</span> million (Note 4.4). The total reported revenues and other income <span class=\"ff42\">amount to \u20ac</span>4,<span class=\"_ _e\"></span>113.3 million. No further g<span class=\"_ _2\"></span>eographical information is provided as revenu<span class=\"_ _e\"></span>es are generated in the countries where the gr<span class=\"_ _2\"></span>id infrastructure is located, which large<span class=\"_ _2\"></span>ly corresponds to the segments mentioned ab<span class=\"_ _e\"></span>ove.<span class=\"_ _e\"></span> The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s own production relates to time <span class=\"ff3f\">sp<span class=\"_ _e\"></span>ent on investment projects by group employees. </span></span>The group<span class=\"_ _2\"></span> recognised \u20ac8.3 mil<span class=\"ff3f\">l<span class=\"_ _e\"></span>ion of revenue in the reporting per<span class=\"_ _2\"></span>iod that was included in the contract liability balance at the beginning of </span>the period (\u20ac1<span class=\"ff3f ls5b\">40<span class=\"ls0\">.5 million). Additional information is provided in Note 6.16. The group did not recognise any substantial revenues in the </span></span>repor<span class=\"_ _2\"></span>ting period with respect to performance obligations in previous periods.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRevenueFromContractsWithCustomersExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__27": {
   "value": "5.1. <span class=\"_ _87\"> </span>Revenue, net income (expense) from settlement mechanism and other income (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Revenue, e<span class=\"_ _2\"></span>xcluding net income from settlement mechanism<span class=\"_ _e\"></span> 3,853.7 2,724.6   <span class=\"ls0\">Grid re<span class=\"_ _2\"></span>venue:<span class=\"_ _e\"></span> </span>3,837.0 2,711.1   <span class=\"ls0\">Last mile connect<span class=\"_ _2\"></span>ion<span class=\"_ _e\"></span> </span>5.1 4.3   <span class=\"ls0\">Other revenue </span>11.6 9.3 Net income (expense) from settle<span class=\"_ _2\"></span>ment mechanism<span class=\"_ _e\"></span> 237.7 173.3 Other income 259.6 135.1   <span class=\"ls0\">Services and techn<span class=\"_ _2\"></span>ical expertise<span class=\"_ _e\"></span> </span>(0.8) (2.2)   <span class=\"ls0\">Own production </span>107.0 82.1   <span class=\"ls0\">Optimal use of a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> </span>16.2 15.8   <span class=\"ls0\">Other </span>136.6 37.8   <span class=\"ls0\">Gain on sale PPE </span>0.7 1.5 We refer<span class=\"_ _2\"></span> to the segment reports for a detailed analysis of the g<span class=\"ff42\">roup\u2019s recognised revenues at segment level. The El<span class=\"_ _e\"></span>ia Tran<span class=\"_ _2\"></span>smission </span>(Belgium) segment r<span class=\"_ _2\"></span>eported revenues and othe<span class=\"_ _e\"></span>r income <span class=\"ff42\">of \u20ac</span>1,561.3 million (Note 4.2), the 50Hertz Transmission (Germany) segment repor<span class=\"_ _2\"></span>ted revenues and other income <span class=\"ff42\">of \u20ac</span>2,5<span class=\"_ _e\"></span>92.6 million (Note <span class=\"ff42\">4.3) and the \u2018Non</span>-<span class=\"ff42\">regulated activities and Nemo Link\u2019 segmen<span class=\"_ _2\"></span>t reported </span>revenues and other income <span class=\"ff42\">of \u20ac44.7</span> million (Note 4.4). The total reported revenues and other income <span class=\"ff42\">amount to \u20ac</span>4,<span class=\"_ _e\"></span>113.3 million. No further g<span class=\"_ _2\"></span>eographical information is provided as revenu<span class=\"_ _e\"></span>es are generated in the countries where the gr<span class=\"_ _2\"></span>id infrastructure is located, which large<span class=\"_ _2\"></span>ly corresponds to the segments mentioned ab<span class=\"_ _e\"></span>ove.<span class=\"_ _e\"></span> The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s own production relates to time <span class=\"ff3f\">sp<span class=\"_ _e\"></span>ent on investment projects by group employees. </span></span>The group<span class=\"_ _2\"></span> recognised \u20ac8.3 mil<span class=\"ff3f\">l<span class=\"_ _e\"></span>ion of revenue in the reporting per<span class=\"_ _2\"></span>iod that was included in the contract liability balance at the beginning of </span>the period (\u20ac1<span class=\"ff3f ls5b\">40<span class=\"ls0\">.5 million). Additional information is provided in Note 6.16. The group did not recognise any substantial revenues in the </span></span>repor<span class=\"_ _2\"></span>ting period with respect to performance obligations in previous periods.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRevenueExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__39": {
   "value": "5.2. <span class=\"_ _87\"> </span>Operating expenses COST <span class=\"_ _e\"></span>OF<span class=\"_ _2\"></span> MATERIALS, SERVICES AND OTHER GOODS (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Raw mater<span class=\"_ _2\"></span>ials, consumables and goods for resale<span class=\"_ _e\"></span> 69.7 83.1 Purchase o<span class=\"_ _2\"></span>f ancillary services<span class=\"_ _e\"></span> 2,142.4 1,067.7 Services and<span class=\"_ _2\"></span> other goods (excl. purchase of ancillary services)<span class=\"_ _e\"></span> 412.3 375.9 Total 2,624.4 1,526.7 The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s costs for \u2018Raw materials, consumables and goods for resale\u2019 decr<span class=\"_ _e\"></span>eased to \u20ac69.7 million for the financial year 2022<span class=\"ff3f\">. In 2022, </span></span>the costs are a<span class=\"_ _2\"></span>ttributable to the Belgian segment for \u20ac5.0 million (\u20ac5.2 million in 2021), the German segment for \u20ac64.2 million <span class=\"_ _e\"></span>(\u20ac7<span class=\"ff3f\">2.0 </span>million in 20<span class=\"_ _2\"></span>21) and EGI for \u20ac0.5 million (\u20ac5.9 million in 2021).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Purchase o<span class=\"_ _2\"></span>f ancillary services\u2019 includes the costs for services which enable the <span class=\"ff3f\">group to balance generation with de<span class=\"_ _e\"></span>mand, maintain </span>constant <span class=\"_ _2\"></span>voltage levels and manage congestio<span class=\"ls5b\">n <span class=\"_ _e\"></span></span>across its grids. The cost incurred in 2022 by Elia Transmission (B<span class=\"_ _e\"></span>elgium) increased to \u20ac<span class=\"ff3f\">566.8<span class=\"_ _2\"></span> million (up <span class=\"ff42\">from \u20ac</span>294.0 million in 2021<span class=\"ls57\">) </span>mainly because of increased prices to cover electricity losses and increased activation<span class=\"_ _2\"></span>s </span>to balan<span class=\"_ _2\"></span>ce the grid against a background of the high en<span class=\"_ _e\"></span>ergy prices<span class=\"ls1d\">. </span>50Hertz Transmission (Germany) incurred incr<span class=\"_ _e\"></span>eased cost<span class=\"_ _2\"></span>s of \u20ac1,575<span class=\"_ _2\"></span>.6<span class=\"ff3f\"> million in 2022 </span>compared to \u20ac<span class=\"_ _e\"></span><span class=\"ff3f\">773.1 million in 2021 also due to higher electricity prices.  </span>\u2018<span class=\"ff3f\">Services and other </span>goods\u2019 relates to maintenance of the<span class=\"_ _2\"></span> g<span class=\"ff3f\">rid, services provided by third parties, insurance and consultancy fees<span class=\"_ _e\"></span>, and </span>others.<span class=\"_ _2\"></span> The cost of these incre<span class=\"ff42\">ased by \u20ac36.4</span> million (<span class=\"_ _e\"></span>+9.6%) <span class=\"ff42\">to \u20ac</span><span class=\"ls5b\">412</span>.3 million. The <span class=\"ls1c\">in</span>crease is mainly explained by the increased level of activities in an infla<span class=\"_ _2\"></span>tionary environment. <span class=\"_ _e\"></span> PERSONN<span class=\"_ _e\"></span>EL EXPENSES<span class=\"_ _2\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Salaries and<span class=\"_ _2\"></span> wages<span class=\"_ _e\"></span> 274.6 242.2 Social security co<span class=\"_ _2\"></span>ntributions<span class=\"_ _e\"></span> 56.6 50.8 Pension costs 29.6 22.6 Other personnel e<span class=\"_ _2\"></span>xpenses<span class=\"_ _e\"></span> 5.8 5.9 Share-based payments expenses 2.0 0.2 Employee b<span class=\"_ _2\"></span>enefits (excl. pensions) 3.6 12.4 Total 372.1 334.1 Personnel e<span class=\"_ _2\"></span>xpenses <span class=\"ff42\">increased by \u20ac38 million in 2022 as <span class=\"_ _e\"></span></span>a consequence of the indexation and the continued growth in headcount<span class=\"ls1d\">, </span>especially in the no<span class=\"_ _2\"></span>n-regulated segment. For Elia <span class=\"_ _e\"></span>Transmission (Belgium) the personnel expenses <span class=\"ff42\">amounted to \u20ac1</span><span class=\"ls78\">83</span>.5 in 2<span class=\"_ _2\"></span>022 compared to<span class=\"_ _2\"></span> <span class=\"ff42 ls5b\">\u20ac16</span>6<span class=\"_ _e\"></span>.5 million in 2021<span class=\"ls1d\">. </span>50Hertz Transmissio<span class=\"_ _e\"></span>n (Germany) accou<span class=\"ff42\">nted for \u20ac168.1 </span>million of the g<span class=\"ff42\">roup\u2019s personnel expenses </span>for 2021 (previou<span class=\"_ _2\"></span>s year: \u20ac1<span class=\"ff3f ls78\">51<span class=\"ls0\">.4 m<span class=\"_ _2\"></span>illion) and the non-<span class=\"ff42\">regulated activities and Nemo Link accounted for \u20ac</span><span class=\"ls5b\">20<span class=\"_ _e\"></span></span>.5 million (previous year: </span></span>\u20ac1<span class=\"ff3f ls0\">6.2 million). All three segments have experienced a growth in the number of full-time equivalents to support the acceleration of the </span>energ<span class=\"_ _2\"></span>y transition and the development opportunities linke<span class=\"_ _e\"></span>d to the expansion o<span class=\"_ _2\"></span>f its international offshore activities<span class=\"_ _e\"></span>. A new capital increase<span class=\"_ _2\"></span> in favour of the members of the pe<span class=\"_ _e\"></span>rsonnel of Elia Group NV/SA and its Belgian subsidiaries <span class=\"_ _e\"></span>was completed in December <span class=\"ls5b\">202</span>2. The capital increase resulted in the creation of <span class=\"ls78\">47</span>,<span class=\"ls5b\">920</span> additional shares without nominal va<span class=\"_ _2\"></span>lue. T<span class=\"_ _e\"></span>he group's employees were grante<span class=\"_ _2\"></span>d a 16.66% reduction on the quoted share <span class=\"_ _e\"></span>price, which resulted in <span class=\"ff42\">a \u20ac1.7 million</span> reduction overall. See Note 6.13 <span class=\"ff42\">\u2018Employee benefits\u2019</span> for more information about p<span class=\"_ _2\"></span>ension costs and employee benefits<span class=\"ff42 ls1c\">\u2019.<span class=\"_ _e\"></span></span><span class=\"fc1d\"> </span>DEPRECIATI<span class=\"_ _e\"></span>ON, AM<span class=\"_ _2\"></span>ORTISATION, IMPAIRMENT AND CHA<span class=\"_ _2\"></span>NGES IN <span class=\"_ _e\"></span>PROVISIONS (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Amortisation<span class=\"_ _2\"></span> of intangible assets<span class=\"_ _e\"></span> 30.2 24.5 Depreciation of prop<span class=\"_ _2\"></span>erty, plant and equipment<span class=\"_ _e\"></span> 483.6 443.1 Total depreciation and a<span class=\"_ _2\"></span>mortisation<span class=\"_ _e\"></span> 513.7 467.5 Impairment of inven<span class=\"_ _2\"></span>tories<span class=\"_ _e\"></span> 0.0 0.6 Total impairment 0.0 0.6 Provisions for<span class=\"_ _2\"></span> litigations<span class=\"_ _e\"></span> (1.5) (0.5) Environmental provisions 0.3 (0.2) Other provision<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> (0.0) 0.0 Changes in p<span class=\"_ _2\"></span>rovisions<span class=\"_ _e\"></span> (1.3) (0.8) Depreciat<span class=\"_ _2\"></span>ion, amortisation, impairment and changes in provisions<span class=\"_ _e\"></span> 512.4 467.4 The total \u2018depreciation, amortisa<span class=\"_ _2\"></span>tion, impairment and changes in provisions\u2019 increased from \u20ac467.4 <span class=\"_ _e\"></span>million in 2021 to \u20ac512.4 million in 2022<span class=\"ls0\">, mainly because of an increase in depreciation of property, plant and equipment due to increasing fixed assets.<span class=\"_ _e\"></span> </span>A detailed descriptio<span class=\"_ _2\"></span>n and movement schedule i<span class=\"_ _e\"></span>s provided in other sections for 'Intangible assets' (see Note 6.2), 'Property, plant and equipment' (see<span class=\"_ _2\"></span> Note 6.1) and 'Provisions' (see Note <span class=\"_ _e\"></span>6.15<span class=\"ls8f\">).</span> OTHER EXPEN<span class=\"_ _e\"></span>SES (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Taxes o<span class=\"_ _2\"></span>ther than income tax<span class=\"_ _e\"></span> 15.4 14.0 Loss on d<span class=\"_ _2\"></span>isposal/sale of property, plant and equipment<span class=\"_ _e\"></span> 17.8 19.1 Impairment on re<span class=\"_ _2\"></span>ceivables<span class=\"_ _e\"></span> 1.2 0.5 Other 10.0 7.7 Total 44.4 41.4 In 2022, the<span class=\"_ _2\"></span> share of Elia Transmission (Belgium) in the g<span class=\"_ _e\"></span><span class=\"ff42\">roup\u2019s other expen<span class=\"_ _2\"></span>ses was \u20ac2<span class=\"_ _e\"></span><span class=\"ff3f\">6.6 </span>million (\u20ac2<span class=\"ff3f\">1.6 million in 2021), 50Hertz </span></span>Transmission (<span class=\"_ _2\"></span>Germany)\u2019s total share amounted to \u20ac1<span class=\"ff3f\">7.<span class=\"_ _e\"></span>0 </span>million (\u20ac<span class=\"ff3f ls78\">19<span class=\"ls0\">.<span class=\"_ _2\"></span>7 million in 2021) and the share of the non-re<span class=\"_ _e\"></span>gulated activities and </span></span>Nemo Link <span class=\"_ _2\"></span>segment accounted for \u20ac0.<span class=\"ff3f\">9 <span class=\"_ _e\"></span></span>million (\u20ac0.<span class=\"ff3f\">1 million in 2021<span class=\"ls8f\">).</span> </span>Taxes o<span class=\"_ _2\"></span>ther than income tax mainly consist of property ta<span class=\"_ _e\"></span>xes.  Losses on<span class=\"_ _2\"></span> disposal for property, plant and equipment totalled \u20ac<span class=\"ff3f ls5b\">12<span class=\"ls0\">.8<span class=\"_ _e\"></span> </span></span>million for Elia Transmission (Belgium), compared with \u20ac<span class=\"_ _2\"></span>9.<span class=\"_ _e\"></span><span class=\"ff3f\">0 million </span>in <span class=\"ff42\">the previous <span class=\"_ _2\"></span>year. 50Hertz Transmission (Germany) recorded \u20ac<span class=\"ff3f\">5.0 million of losses on disposal for prope<span class=\"_ _e\"></span>rty, plant and equipment in<span class=\"_ _2\"></span> </span></span>2021<span class=\"ff42 ls0\">, from \u20ac1<span class=\"ff3f\">0.1 million in 202</span></span>1.<span class=\"_ _e\"></span><span class=\"ls0\"> </span>The amoun<span class=\"_ _2\"></span>t of impairment on trade receivables is explained in Note 8.1 \u2018Financial risk and derivative management\u2019.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherOperatingIncomeExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__33": {
   "value": "5.2. <span class=\"_ _87\"> </span>Operating expenses COST <span class=\"_ _e\"></span>OF<span class=\"_ _2\"></span> MATERIALS, SERVICES AND OTHER GOODS (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Raw mater<span class=\"_ _2\"></span>ials, consumables and goods for resale<span class=\"_ _e\"></span> 69.7 83.1 Purchase o<span class=\"_ _2\"></span>f ancillary services<span class=\"_ _e\"></span> 2,142.4 1,067.7 Services and<span class=\"_ _2\"></span> other goods (excl. purchase of ancillary services)<span class=\"_ _e\"></span> 412.3 375.9 Total 2,624.4 1,526.7 The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s costs for \u2018Raw materials, consumables and goods for resale\u2019 decr<span class=\"_ _e\"></span>eased to \u20ac69.7 million for the financial year 2022<span class=\"ff3f\">. In 2022, </span></span>the costs are a<span class=\"_ _2\"></span>ttributable to the Belgian segment for \u20ac5.0 million (\u20ac5.2 million in 2021), the German segment for \u20ac64.2 million <span class=\"_ _e\"></span>(\u20ac7<span class=\"ff3f\">2.0 </span>million in 20<span class=\"_ _2\"></span>21) and EGI for \u20ac0.5 million (\u20ac5.9 million in 2021).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Purchase o<span class=\"_ _2\"></span>f ancillary services\u2019 includes the costs for services which enable the <span class=\"ff3f\">group to balance generation with de<span class=\"_ _e\"></span>mand, maintain </span>constant <span class=\"_ _2\"></span>voltage levels and manage congestio<span class=\"ls5b\">n <span class=\"_ _e\"></span></span>across its grids. The cost incurred in 2022 by Elia Transmission (B<span class=\"_ _e\"></span>elgium) increased to \u20ac<span class=\"ff3f\">566.8<span class=\"_ _2\"></span> million (up <span class=\"ff42\">from \u20ac</span>294.0 million in 2021<span class=\"ls57\">) </span>mainly because of increased prices to cover electricity losses and increased activation<span class=\"_ _2\"></span>s </span>to balan<span class=\"_ _2\"></span>ce the grid against a background of the high en<span class=\"_ _e\"></span>ergy prices<span class=\"ls1d\">. </span>50Hertz Transmission (Germany) incurred incr<span class=\"_ _e\"></span>eased cost<span class=\"_ _2\"></span>s of \u20ac1,575<span class=\"_ _2\"></span>.6<span class=\"ff3f\"> million in 2022 </span>compared to \u20ac<span class=\"_ _e\"></span><span class=\"ff3f\">773.1 million in 2021 also due to higher electricity prices.  </span>\u2018<span class=\"ff3f\">Services and other </span>goods\u2019 relates to maintenance of the<span class=\"_ _2\"></span> g<span class=\"ff3f\">rid, services provided by third parties, insurance and consultancy fees<span class=\"_ _e\"></span>, and </span>others.<span class=\"_ _2\"></span> The cost of these incre<span class=\"ff42\">ased by \u20ac36.4</span> million (<span class=\"_ _e\"></span>+9.6%) <span class=\"ff42\">to \u20ac</span><span class=\"ls5b\">412</span>.3 million. The <span class=\"ls1c\">in</span>crease is mainly explained by the increased level of activities in an infla<span class=\"_ _2\"></span>tionary environment. <span class=\"_ _e\"></span> PERSONN<span class=\"_ _e\"></span>EL EXPENSES<span class=\"_ _2\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Salaries and<span class=\"_ _2\"></span> wages<span class=\"_ _e\"></span> 274.6 242.2 Social security co<span class=\"_ _2\"></span>ntributions<span class=\"_ _e\"></span> 56.6 50.8 Pension costs 29.6 22.6 Other personnel e<span class=\"_ _2\"></span>xpenses<span class=\"_ _e\"></span> 5.8 5.9 Share-based payments expenses 2.0 0.2 Employee b<span class=\"_ _2\"></span>enefits (excl. pensions) 3.6 12.4 Total 372.1 334.1 Personnel e<span class=\"_ _2\"></span>xpenses <span class=\"ff42\">increased by \u20ac38 million in 2022 as <span class=\"_ _e\"></span></span>a consequence of the indexation and the continued growth in headcount<span class=\"ls1d\">, </span>especially in the no<span class=\"_ _2\"></span>n-regulated segment. For Elia <span class=\"_ _e\"></span>Transmission (Belgium) the personnel expenses <span class=\"ff42\">amounted to \u20ac1</span><span class=\"ls78\">83</span>.5 in 2<span class=\"_ _2\"></span>022 compared to<span class=\"_ _2\"></span> <span class=\"ff42 ls5b\">\u20ac16</span>6<span class=\"_ _e\"></span>.5 million in 2021<span class=\"ls1d\">. </span>50Hertz Transmissio<span class=\"_ _e\"></span>n (Germany) accou<span class=\"ff42\">nted for \u20ac168.1 </span>million of the g<span class=\"ff42\">roup\u2019s personnel expenses </span>for 2021 (previou<span class=\"_ _2\"></span>s year: \u20ac1<span class=\"ff3f ls78\">51<span class=\"ls0\">.4 m<span class=\"_ _2\"></span>illion) and the non-<span class=\"ff42\">regulated activities and Nemo Link accounted for \u20ac</span><span class=\"ls5b\">20<span class=\"_ _e\"></span></span>.5 million (previous year: </span></span>\u20ac1<span class=\"ff3f ls0\">6.2 million). All three segments have experienced a growth in the number of full-time equivalents to support the acceleration of the </span>energ<span class=\"_ _2\"></span>y transition and the development opportunities linke<span class=\"_ _e\"></span>d to the expansion o<span class=\"_ _2\"></span>f its international offshore activities<span class=\"_ _e\"></span>. A new capital increase<span class=\"_ _2\"></span> in favour of the members of the pe<span class=\"_ _e\"></span>rsonnel of Elia Group NV/SA and its Belgian subsidiaries <span class=\"_ _e\"></span>was completed in December <span class=\"ls5b\">202</span>2. The capital increase resulted in the creation of <span class=\"ls78\">47</span>,<span class=\"ls5b\">920</span> additional shares without nominal va<span class=\"_ _2\"></span>lue. T<span class=\"_ _e\"></span>he group's employees were grante<span class=\"_ _2\"></span>d a 16.66% reduction on the quoted share <span class=\"_ _e\"></span>price, which resulted in <span class=\"ff42\">a \u20ac1.7 million</span> reduction overall. See Note 6.13 <span class=\"ff42\">\u2018Employee benefits\u2019</span> for more information about p<span class=\"_ _2\"></span>ension costs and employee benefits<span class=\"ff42 ls1c\">\u2019.<span class=\"_ _e\"></span></span><span class=\"fc1d\"> </span>DEPRECIATI<span class=\"_ _e\"></span>ON, AM<span class=\"_ _2\"></span>ORTISATION, IMPAIRMENT AND CHA<span class=\"_ _2\"></span>NGES IN <span class=\"_ _e\"></span>PROVISIONS (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Amortisation<span class=\"_ _2\"></span> of intangible assets<span class=\"_ _e\"></span> 30.2 24.5 Depreciation of prop<span class=\"_ _2\"></span>erty, plant and equipment<span class=\"_ _e\"></span> 483.6 443.1 Total depreciation and a<span class=\"_ _2\"></span>mortisation<span class=\"_ _e\"></span> 513.7 467.5 Impairment of inven<span class=\"_ _2\"></span>tories<span class=\"_ _e\"></span> 0.0 0.6 Total impairment 0.0 0.6 Provisions for<span class=\"_ _2\"></span> litigations<span class=\"_ _e\"></span> (1.5) (0.5) Environmental provisions 0.3 (0.2) Other provision<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> (0.0) 0.0 Changes in p<span class=\"_ _2\"></span>rovisions<span class=\"_ _e\"></span> (1.3) (0.8) Depreciat<span class=\"_ _2\"></span>ion, amortisation, impairment and changes in provisions<span class=\"_ _e\"></span> 512.4 467.4 The total \u2018depreciation, amortisa<span class=\"_ _2\"></span>tion, impairment and changes in provisions\u2019 increased from \u20ac467.4 <span class=\"_ _e\"></span>million in 2021 to \u20ac512.4 million in 2022<span class=\"ls0\">, mainly because of an increase in depreciation of property, plant and equipment due to increasing fixed assets.<span class=\"_ _e\"></span> </span>A detailed descriptio<span class=\"_ _2\"></span>n and movement schedule i<span class=\"_ _e\"></span>s provided in other sections for 'Intangible assets' (see Note 6.2), 'Property, plant and equipment' (see<span class=\"_ _2\"></span> Note 6.1) and 'Provisions' (see Note <span class=\"_ _e\"></span>6.15<span class=\"ls8f\">).</span> OTHER EXPEN<span class=\"_ _e\"></span>SES (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Taxes o<span class=\"_ _2\"></span>ther than income tax<span class=\"_ _e\"></span> 15.4 14.0 Loss on d<span class=\"_ _2\"></span>isposal/sale of property, plant and equipment<span class=\"_ _e\"></span> 17.8 19.1 Impairment on re<span class=\"_ _2\"></span>ceivables<span class=\"_ _e\"></span> 1.2 0.5 Other 10.0 7.7 Total 44.4 41.4 In 2022, the<span class=\"_ _2\"></span> share of Elia Transmission (Belgium) in the g<span class=\"_ _e\"></span><span class=\"ff42\">roup\u2019s other expen<span class=\"_ _2\"></span>ses was \u20ac2<span class=\"_ _e\"></span><span class=\"ff3f\">6.6 </span>million (\u20ac2<span class=\"ff3f\">1.6 million in 2021), 50Hertz </span></span>Transmission (<span class=\"_ _2\"></span>Germany)\u2019s total share amounted to \u20ac1<span class=\"ff3f\">7.<span class=\"_ _e\"></span>0 </span>million (\u20ac<span class=\"ff3f ls78\">19<span class=\"ls0\">.<span class=\"_ _2\"></span>7 million in 2021) and the share of the non-re<span class=\"_ _e\"></span>gulated activities and </span></span>Nemo Link <span class=\"_ _2\"></span>segment accounted for \u20ac0.<span class=\"ff3f\">9 <span class=\"_ _e\"></span></span>million (\u20ac0.<span class=\"ff3f\">1 million in 2021<span class=\"ls8f\">).</span> </span>Taxes o<span class=\"_ _2\"></span>ther than income tax mainly consist of property ta<span class=\"_ _e\"></span>xes.  Losses on<span class=\"_ _2\"></span> disposal for property, plant and equipment totalled \u20ac<span class=\"ff3f ls5b\">12<span class=\"ls0\">.8<span class=\"_ _e\"></span> </span></span>million for Elia Transmission (Belgium), compared with \u20ac<span class=\"_ _2\"></span>9.<span class=\"_ _e\"></span><span class=\"ff3f\">0 million </span>in <span class=\"ff42\">the previous <span class=\"_ _2\"></span>year. 50Hertz Transmission (Germany) recorded \u20ac<span class=\"ff3f\">5.0 million of losses on disposal for prope<span class=\"_ _e\"></span>rty, plant and equipment in<span class=\"_ _2\"></span> </span></span>2021<span class=\"ff42 ls0\">, from \u20ac1<span class=\"ff3f\">0.1 million in 202</span></span>1.<span class=\"_ _e\"></span><span class=\"ls0\"> </span>The amoun<span class=\"_ _2\"></span>t of impairment on trade receivables is explained in Note 8.1 \u2018Financial risk and derivative management\u2019.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfExpensesByNatureExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__32": {
   "value": "5.2. <span class=\"_ _87\"> </span>Operating expenses COST <span class=\"_ _e\"></span>OF<span class=\"_ _2\"></span> MATERIALS, SERVICES AND OTHER GOODS (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Raw mater<span class=\"_ _2\"></span>ials, consumables and goods for resale<span class=\"_ _e\"></span> 69.7 83.1 Purchase o<span class=\"_ _2\"></span>f ancillary services<span class=\"_ _e\"></span> 2,142.4 1,067.7 Services and<span class=\"_ _2\"></span> other goods (excl. purchase of ancillary services)<span class=\"_ _e\"></span> 412.3 375.9 Total 2,624.4 1,526.7 The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s costs for \u2018Raw materials, consumables and goods for resale\u2019 decr<span class=\"_ _e\"></span>eased to \u20ac69.7 million for the financial year 2022<span class=\"ff3f\">. In 2022, </span></span>the costs are a<span class=\"_ _2\"></span>ttributable to the Belgian segment for \u20ac5.0 million (\u20ac5.2 million in 2021), the German segment for \u20ac64.2 million <span class=\"_ _e\"></span>(\u20ac7<span class=\"ff3f\">2.0 </span>million in 20<span class=\"_ _2\"></span>21) and EGI for \u20ac0.5 million (\u20ac5.9 million in 2021).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Purchase o<span class=\"_ _2\"></span>f ancillary services\u2019 includes the costs for services which enable the <span class=\"ff3f\">group to balance generation with de<span class=\"_ _e\"></span>mand, maintain </span>constant <span class=\"_ _2\"></span>voltage levels and manage congestio<span class=\"ls5b\">n <span class=\"_ _e\"></span></span>across its grids. The cost incurred in 2022 by Elia Transmission (B<span class=\"_ _e\"></span>elgium) increased to \u20ac<span class=\"ff3f\">566.8<span class=\"_ _2\"></span> million (up <span class=\"ff42\">from \u20ac</span>294.0 million in 2021<span class=\"ls57\">) </span>mainly because of increased prices to cover electricity losses and increased activation<span class=\"_ _2\"></span>s </span>to balan<span class=\"_ _2\"></span>ce the grid against a background of the high en<span class=\"_ _e\"></span>ergy prices<span class=\"ls1d\">. </span>50Hertz Transmission (Germany) incurred incr<span class=\"_ _e\"></span>eased cost<span class=\"_ _2\"></span>s of \u20ac1,575<span class=\"_ _2\"></span>.6<span class=\"ff3f\"> million in 2022 </span>compared to \u20ac<span class=\"_ _e\"></span><span class=\"ff3f\">773.1 million in 2021 also due to higher electricity prices.  </span>\u2018<span class=\"ff3f\">Services and other </span>goods\u2019 relates to maintenance of the<span class=\"_ _2\"></span> g<span class=\"ff3f\">rid, services provided by third parties, insurance and consultancy fees<span class=\"_ _e\"></span>, and </span>others.<span class=\"_ _2\"></span> The cost of these incre<span class=\"ff42\">ased by \u20ac36.4</span> million (<span class=\"_ _e\"></span>+9.6%) <span class=\"ff42\">to \u20ac</span><span class=\"ls5b\">412</span>.3 million. The <span class=\"ls1c\">in</span>crease is mainly explained by the increased level of activities in an infla<span class=\"_ _2\"></span>tionary environment. <span class=\"_ _e\"></span> PERSONN<span class=\"_ _e\"></span>EL EXPENSES<span class=\"_ _2\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Salaries and<span class=\"_ _2\"></span> wages<span class=\"_ _e\"></span> 274.6 242.2 Social security co<span class=\"_ _2\"></span>ntributions<span class=\"_ _e\"></span> 56.6 50.8 Pension costs 29.6 22.6 Other personnel e<span class=\"_ _2\"></span>xpenses<span class=\"_ _e\"></span> 5.8 5.9 Share-based payments expenses 2.0 0.2 Employee b<span class=\"_ _2\"></span>enefits (excl. pensions) 3.6 12.4 Total 372.1 334.1 Personnel e<span class=\"_ _2\"></span>xpenses <span class=\"ff42\">increased by \u20ac38 million in 2022 as <span class=\"_ _e\"></span></span>a consequence of the indexation and the continued growth in headcount<span class=\"ls1d\">, </span>especially in the no<span class=\"_ _2\"></span>n-regulated segment. For Elia <span class=\"_ _e\"></span>Transmission (Belgium) the personnel expenses <span class=\"ff42\">amounted to \u20ac1</span><span class=\"ls78\">83</span>.5 in 2<span class=\"_ _2\"></span>022 compared to<span class=\"_ _2\"></span> <span class=\"ff42 ls5b\">\u20ac16</span>6<span class=\"_ _e\"></span>.5 million in 2021<span class=\"ls1d\">. </span>50Hertz Transmissio<span class=\"_ _e\"></span>n (Germany) accou<span class=\"ff42\">nted for \u20ac168.1 </span>million of the g<span class=\"ff42\">roup\u2019s personnel expenses </span>for 2021 (previou<span class=\"_ _2\"></span>s year: \u20ac1<span class=\"ff3f ls78\">51<span class=\"ls0\">.4 m<span class=\"_ _2\"></span>illion) and the non-<span class=\"ff42\">regulated activities and Nemo Link accounted for \u20ac</span><span class=\"ls5b\">20<span class=\"_ _e\"></span></span>.5 million (previous year: </span></span>\u20ac1<span class=\"ff3f ls0\">6.2 million). All three segments have experienced a growth in the number of full-time equivalents to support the acceleration of the </span>energ<span class=\"_ _2\"></span>y transition and the development opportunities linke<span class=\"_ _e\"></span>d to the expansion o<span class=\"_ _2\"></span>f its international offshore activities<span class=\"_ _e\"></span>. A new capital increase<span class=\"_ _2\"></span> in favour of the members of the pe<span class=\"_ _e\"></span>rsonnel of Elia Group NV/SA and its Belgian subsidiaries <span class=\"_ _e\"></span>was completed in December <span class=\"ls5b\">202</span>2. The capital increase resulted in the creation of <span class=\"ls78\">47</span>,<span class=\"ls5b\">920</span> additional shares without nominal va<span class=\"_ _2\"></span>lue. T<span class=\"_ _e\"></span>he group's employees were grante<span class=\"_ _2\"></span>d a 16.66% reduction on the quoted share <span class=\"_ _e\"></span>price, which resulted in <span class=\"ff42\">a \u20ac1.7 million</span> reduction overall. See Note 6.13 <span class=\"ff42\">\u2018Employee benefits\u2019</span> for more information about p<span class=\"_ _2\"></span>ension costs and employee benefits<span class=\"ff42 ls1c\">\u2019.<span class=\"_ _e\"></span></span><span class=\"fc1d\"> </span>DEPRECIATI<span class=\"_ _e\"></span>ON, AM<span class=\"_ _2\"></span>ORTISATION, IMPAIRMENT AND CHA<span class=\"_ _2\"></span>NGES IN <span class=\"_ _e\"></span>PROVISIONS (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Amortisation<span class=\"_ _2\"></span> of intangible assets<span class=\"_ _e\"></span> 30.2 24.5 Depreciation of prop<span class=\"_ _2\"></span>erty, plant and equipment<span class=\"_ _e\"></span> 483.6 443.1 Total depreciation and a<span class=\"_ _2\"></span>mortisation<span class=\"_ _e\"></span> 513.7 467.5 Impairment of inven<span class=\"_ _2\"></span>tories<span class=\"_ _e\"></span> 0.0 0.6 Total impairment 0.0 0.6 Provisions for<span class=\"_ _2\"></span> litigations<span class=\"_ _e\"></span> (1.5) (0.5) Environmental provisions 0.3 (0.2) Other provision<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> (0.0) 0.0 Changes in p<span class=\"_ _2\"></span>rovisions<span class=\"_ _e\"></span> (1.3) (0.8) Depreciat<span class=\"_ _2\"></span>ion, amortisation, impairment and changes in provisions<span class=\"_ _e\"></span> 512.4 467.4 The total \u2018depreciation, amortisa<span class=\"_ _2\"></span>tion, impairment and changes in provisions\u2019 increased from \u20ac467.4 <span class=\"_ _e\"></span>million in 2021 to \u20ac512.4 million in 2022<span class=\"ls0\">, mainly because of an increase in depreciation of property, plant and equipment due to increasing fixed assets.<span class=\"_ _e\"></span> </span>A detailed descriptio<span class=\"_ _2\"></span>n and movement schedule i<span class=\"_ _e\"></span>s provided in other sections for 'Intangible assets' (see Note 6.2), 'Property, plant and equipment' (see<span class=\"_ _2\"></span> Note 6.1) and 'Provisions' (see Note <span class=\"_ _e\"></span>6.15<span class=\"ls8f\">).</span> OTHER EXPEN<span class=\"_ _e\"></span>SES (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Taxes o<span class=\"_ _2\"></span>ther than income tax<span class=\"_ _e\"></span> 15.4 14.0 Loss on d<span class=\"_ _2\"></span>isposal/sale of property, plant and equipment<span class=\"_ _e\"></span> 17.8 19.1 Impairment on re<span class=\"_ _2\"></span>ceivables<span class=\"_ _e\"></span> 1.2 0.5 Other 10.0 7.7 Total 44.4 41.4 In 2022, the<span class=\"_ _2\"></span> share of Elia Transmission (Belgium) in the g<span class=\"_ _e\"></span><span class=\"ff42\">roup\u2019s other expen<span class=\"_ _2\"></span>ses was \u20ac2<span class=\"_ _e\"></span><span class=\"ff3f\">6.6 </span>million (\u20ac2<span class=\"ff3f\">1.6 million in 2021), 50Hertz </span></span>Transmission (<span class=\"_ _2\"></span>Germany)\u2019s total share amounted to \u20ac1<span class=\"ff3f\">7.<span class=\"_ _e\"></span>0 </span>million (\u20ac<span class=\"ff3f ls78\">19<span class=\"ls0\">.<span class=\"_ _2\"></span>7 million in 2021) and the share of the non-re<span class=\"_ _e\"></span>gulated activities and </span></span>Nemo Link <span class=\"_ _2\"></span>segment accounted for \u20ac0.<span class=\"ff3f\">9 <span class=\"_ _e\"></span></span>million (\u20ac0.<span class=\"ff3f\">1 million in 2021<span class=\"ls8f\">).</span> </span>Taxes o<span class=\"_ _2\"></span>ther than income tax mainly consist of property ta<span class=\"_ _e\"></span>xes.  Losses on<span class=\"_ _2\"></span> disposal for property, plant and equipment totalled \u20ac<span class=\"ff3f ls5b\">12<span class=\"ls0\">.8<span class=\"_ _e\"></span> </span></span>million for Elia Transmission (Belgium), compared with \u20ac<span class=\"_ _2\"></span>9.<span class=\"_ _e\"></span><span class=\"ff3f\">0 million </span>in <span class=\"ff42\">the previous <span class=\"_ _2\"></span>year. 50Hertz Transmission (Germany) recorded \u20ac<span class=\"ff3f\">5.0 million of losses on disposal for prope<span class=\"_ _e\"></span>rty, plant and equipment in<span class=\"_ _2\"></span> </span></span>2021<span class=\"ff42 ls0\">, from \u20ac1<span class=\"ff3f\">0.1 million in 202</span></span>1.<span class=\"_ _e\"></span><span class=\"ls0\"> </span>The amoun<span class=\"_ _2\"></span>t of impairment on trade receivables is explained in Note 8.1 \u2018Financial risk and derivative management\u2019.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfExpensesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__34": {
   "value": "COST <span class=\"_ _e\"></span>OF<span class=\"_ _2\"></span> MATERIALS, SERVICES AND OTHER GOODS (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Raw mater<span class=\"_ _2\"></span>ials, consumables and goods for resale<span class=\"_ _e\"></span> 69.7 83.1 Purchase o<span class=\"_ _2\"></span>f ancillary services<span class=\"_ _e\"></span> 2,142.4 1,067.7 Services and<span class=\"_ _2\"></span> other goods (excl. purchase of ancillary services)<span class=\"_ _e\"></span> 412.3 375.9 Total 2,624.4 1,526.7 The g<span class=\"ff42\">roup<span class=\"_ _2\"></span>\u2019s costs for \u2018Raw materials, consumables and goods for resale\u2019 decr<span class=\"_ _e\"></span>eased to \u20ac69.7 million for the financial year 2022<span class=\"ff3f\">. In 2022, </span></span>the costs are a<span class=\"_ _2\"></span>ttributable to the Belgian segment for \u20ac5.0 million (\u20ac5.2 million in 2021), the German segment for \u20ac64.2 million <span class=\"_ _e\"></span>(\u20ac7<span class=\"ff3f\">2.0 </span>million in 20<span class=\"_ _2\"></span>21) and EGI for \u20ac0.5 million (\u20ac5.9 million in 2021).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Purchase o<span class=\"_ _2\"></span>f ancillary services\u2019 includes the costs for services which enable the <span class=\"ff3f\">group to balance generation with de<span class=\"_ _e\"></span>mand, maintain </span>constant <span class=\"_ _2\"></span>voltage levels and manage congestio<span class=\"ls5b\">n <span class=\"_ _e\"></span></span>across its grids. The cost incurred in 2022 by Elia Transmission (B<span class=\"_ _e\"></span>elgium) increased to \u20ac<span class=\"ff3f\">566.8<span class=\"_ _2\"></span> million (up <span class=\"ff42\">from \u20ac</span>294.0 million in 2021<span class=\"ls57\">) </span>mainly because of increased prices to cover electricity losses and increased activation<span class=\"_ _2\"></span>s </span>to balan<span class=\"_ _2\"></span>ce the grid against a background of the high en<span class=\"_ _e\"></span>ergy prices<span class=\"ls1d\">. </span>50Hertz Transmission (Germany) incurred incr<span class=\"_ _e\"></span>eased cost<span class=\"_ _2\"></span>s of \u20ac1,575<span class=\"_ _2\"></span>.6<span class=\"ff3f\"> million in 2022 </span>compared to \u20ac<span class=\"_ _e\"></span><span class=\"ff3f\">773.1 million in 2021 also due to higher electricity prices.  </span>\u2018<span class=\"ff3f\">Services and other </span>goods\u2019 relates to maintenance of the<span class=\"_ _2\"></span> g<span class=\"ff3f\">rid, services provided by third parties, insurance and consultancy fees<span class=\"_ _e\"></span>, and </span>others.<span class=\"_ _2\"></span> The cost of these incre<span class=\"ff42\">ased by \u20ac36.4</span> million (<span class=\"_ _e\"></span>+9.6%) <span class=\"ff42\">to \u20ac</span><span class=\"ls5b\">412</span>.3 million. The <span class=\"ls1c\">in</span>crease is mainly explained by the increased level of activities in an infla<span class=\"_ _2\"></span>tionary environment.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCostOfSalesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__31-1": {
   "value": "PERSONN<span class=\"_ _e\"></span>EL EXPENSES<span class=\"_ _2\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Salaries and<span class=\"_ _2\"></span> wages<span class=\"_ _e\"></span> 274.6 242.2 Social security co<span class=\"_ _2\"></span>ntributions<span class=\"_ _e\"></span> 56.6 50.8 Pension costs 29.6 22.6 Other personnel e<span class=\"_ _2\"></span>xpenses<span class=\"_ _e\"></span> 5.8 5.9 Share-based payments expenses 2.0 0.2 Employee b<span class=\"_ _2\"></span>enefits (excl. pensions) 3.6 12.4 Total 372.1 334.1 Personnel e<span class=\"_ _2\"></span>xpenses <span class=\"ff42\">increased by \u20ac38 million in 2022 as <span class=\"_ _e\"></span></span>a consequence of the indexation and the continued growth in headcount<span class=\"ls1d\">, </span>especially in the no<span class=\"_ _2\"></span>n-regulated segment. For Elia <span class=\"_ _e\"></span>Transmission (Belgium) the personnel expenses <span class=\"ff42\">amounted to \u20ac1</span><span class=\"ls78\">83</span>.5 in 2<span class=\"_ _2\"></span>022 compared to<span class=\"_ _2\"></span> <span class=\"ff42 ls5b\">\u20ac16</span>6<span class=\"_ _e\"></span>.5 million in 2021<span class=\"ls1d\">. </span>50Hertz Transmissio<span class=\"_ _e\"></span>n (Germany) accou<span class=\"ff42\">nted for \u20ac168.1 </span>million of the g<span class=\"ff42\">roup\u2019s personnel expenses </span>for 2021 (previou<span class=\"_ _2\"></span>s year: \u20ac1<span class=\"ff3f ls78\">51<span class=\"ls0\">.4 m<span class=\"_ _2\"></span>illion) and the non-<span class=\"ff42\">regulated activities and Nemo Link accounted for \u20ac</span><span class=\"ls5b\">20<span class=\"_ _e\"></span></span>.5 million (previous year: </span></span>\u20ac1<span class=\"ff3f ls0\">6.2 million). All three segments have experienced a growth in the number of full-time equivalents to support the acceleration of the </span>energ<span class=\"_ _2\"></span>y transition and the development opportunities linke<span class=\"_ _e\"></span>d to the expansion o<span class=\"_ _2\"></span>f its international offshore activities<span class=\"_ _e\"></span>. A new capital increase<span class=\"_ _2\"></span> in favour of the members of the pe<span class=\"_ _e\"></span>rsonnel of Elia Group NV/SA and its Belgian subsidiaries <span class=\"_ _e\"></span>was completed in December <span class=\"ls5b\">202</span>2. The capital increase resulted in the creation of <span class=\"ls78\">47</span>,<span class=\"ls5b\">920</span> additional shares without nominal va<span class=\"_ _2\"></span>lue. T<span class=\"_ _e\"></span>he group's employees were grante<span class=\"_ _2\"></span>d a 16.66% reduction on the quoted share <span class=\"_ _e\"></span>price, which resulted in <span class=\"ff42\">a \u20ac1.7 million</span> reduction overall. See Note 6.13 <span class=\"ff42\">\u2018Employee benefits\u2019</span> for more information about p<span class=\"_ _2\"></span>ension costs and employee benefits\u2019.Re<span class=\"_ _e\"></span>me<span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>su<span class=\"_ _e\"></span>re<span class=\"_ _e\"></span>me<span class=\"_ _e\"></span>n<span class=\"_ _e\"></span>ts<span class=\"_ _20\"></span> of<span class=\"_ _e\"></span> p<span class=\"_ _e\"></span>o<span class=\"_ _e\"></span>st-<span class=\"_ _e\"></span>e<span class=\"_ _e\"></span>mp<span class=\"_ _e\"></span>lo<span class=\"_ _e\"></span>y<span class=\"_ _e\"></span>me<span class=\"_ _e\"></span>nt<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>be<span class=\"_ _e\"></span>ne<span class=\"_ _e\"></span>fi<span class=\"_ _e\"></span>t <span class=\"_ _e\"></span>o<span class=\"_ _e\"></span>bli<span class=\"_ _e\"></span>g<span class=\"_ _e\"></span>at<span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>ons<span class=\"_ _20\"></span><span class=\"ff40\"> </span>The o<span class=\"_ _2\"></span>ther comprehensive income on post-<span class=\"_ _e\"></span>employment obligations had a positive impact amounting to <span class=\"ff42\">\u20ac</span><span class=\"ls5b\">16</span>.3 <span class=\"_ _e\"></span>million. This impact is mainly expla<span class=\"_ _2\"></span>ined by the increase <span class=\"lsa7\">in</span> <span class=\"_ _2\"></span>the discount rate, partly offset by the negative return of the plan assets. See No<span class=\"_ _e\"></span>te 6<span class=\"ls1d\">.1</span>3 for more details.SHARE-BASED <span class=\"_ _e\"></span>PAYMENTS At 31 <span class=\"_ _e\"></span>May 2021, E<span class=\"_ _e\"></span>urogrid International <span class=\"_ _e\"></span>SA/NV<span class=\"_ _e\"></span><span class=\"ff40\"> </span>h<span class=\"_ _e\"></span>as grant<span class=\"_ _e\"></span>ed 1,640 st<span class=\"_ _e\"></span>ock options <span class=\"_ _e\"></span>to <span class=\"_ _e\"></span>the e<span class=\"_ _e\"></span>mployees of R<span class=\"_ _e\"></span>ealTo BV<span class=\"_ _e\"></span>/SRL and RealTo <span class=\"_ _e\"></span>GmbH at a str<span class=\"_ _2\"></span>ike price of \u20ac100 per stock option at exercise date 31 Mar<span class=\"_ _2\"></span>ch 2024. <span class=\"ff3f\">A<span class=\"_ _e\"></span>s per 14 March 2023, 500 additional stock options have been </span>granted <span class=\"_ _2\"></span>to new <span class=\"_ _2\"></span>employees at <span class=\"_ _2\"></span>the same terms <span class=\"_ _2\"></span>and conditions. In <span class=\"_ _2\"></span>total, 2,1<span class=\"ff42\">20 sto<span class=\"_ _2\"></span>ck options have b<span class=\"_ _2\"></span>een a<span class=\"_ _2\"></span>ccepted, worth \u20ac1,<span class=\"ff3f\">4 million. As pe<span class=\"_ _2\"></span>r </span></span>31 December 2022, 1.140 options ar<span class=\"_ _e\"></span>e still living. T<span class=\"_ _e\"></span>he share-based <span class=\"_ _e\"></span>payments cost amounted to <span class=\"_ _e\"></span><span class=\"ff42 ls5b\">\u20ac0.</span>3<span class=\"_ _e\"></span> million in 202<span class=\"ff42\">2<span class=\"_ _e\"></span> (\u20ac0.2 million)</span>. As<span class=\"_ _e\"></span> the stock option <span class=\"_ _e\"></span>plan<span class=\"_ _e\"></span> concerns <span class=\"_ _e\"></span>shar<span class=\"_ _e\"></span>es in<span class=\"_ _e\"></span> RealTo <span class=\"_ _e\"></span>BV/SR<span class=\"_ _e\"></span>L a<span class=\"_ _e\"></span>nd <span class=\"_ _e\"></span>its <span class=\"_ _e\"></span>parent c<span class=\"_ _e\"></span>ompany, t<span class=\"_ _e\"></span>he s<span class=\"_ _e\"></span>hare<span class=\"_ _20\"></span>-b<span class=\"_ _2\"></span>ased <span class=\"_ _e\"></span>payments <span class=\"_ _e\"></span>are <span class=\"_ _e\"></span>not <span class=\"_ _e\"></span>presented <span class=\"_ _e\"></span>separately in the sta<span class=\"_ _2\"></span>tement of equity.6.14. <span class=\"_ _92\"> </span>Employee ben<span class=\"_ _e\"></span>efits The group<span class=\"_ _2\"></span> has various legal and constructive defined ben<span class=\"_ _e\"></span>efit obligations linked<span class=\"_ _2\"></span> to its Belgian and German operations.<span class=\"_ _e\"></span> The total ne<span class=\"_ _2\"></span>t liability for employee-benefit obligations is a<span class=\"_ _e\"></span>s follows: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany Total Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany Total Defined benefit p<span class=\"_ _2\"></span>lans<span class=\"_ _e\"></span> 4.3 20.9 25.1 28.6 34.0 62.6 Post-emplo<span class=\"_ _2\"></span>yment benefits other than pensions<span class=\"_ _e\"></span> 47.6 4.3 51.9 36.2 7.9 44.0 Subtotal 51.9 25.2 77.1 64.8 41.8 106.6 Other (non actuar<span class=\"_ _2\"></span>ial provision)<span class=\"_ _e\"></span> 1.0 1.0 0.0 Total prov<span class=\"_ _2\"></span>isions for employee benefits 51.9 26.2 78.1 64.8 41.8 106.6 Of the \u20ac<span class=\"ff3f\">78.1 million in employe<span class=\"_ _2\"></span>e benefits pr<span class=\"_ _e\"></span>ovisions recognised at the end of the financial year 2022<span class=\"ff42 ls1d\">, \u20ac</span>75.0 million <span class=\"_ _e\"></span>is presented in the </span>long term and \u20ac<span class=\"ff3f\">3.2 million in the short term (see Note 6.14<span class=\"ls8f\">).</span> </span>BELGIUM DEFINED-CONTRIBUTION PLAN Employees remunera<span class=\"_ _2\"></span>ted based on a salary scale and rec<span class=\"_ _e\"></span>ruited after<span class=\"_ _2\"></span> 1 June 2002, as well as management staff recruited after 1<span class=\"_ _e\"></span> May 1999 are co<span class=\"_ _2\"></span>vered by two defined-contribution pension plans (Powerbel and Enerbel): <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> Enerbel plan is a plan for<span class=\"ff40\"> </span>salaried employees hired after 1 June 2002, to which the employee and the employer contribute </span></span>based on predefined formula<span class=\"_ _2\"></span>.  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> Powerbel plan is a plan for managers hired after 1 May 1999. The contributions of the employee and employer are based on </span></span>a fixed <span class=\"ff42\">percen<span class=\"_ _2\"></span>tage of the employee\u2019s salary. <span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>The new law regard<span class=\"_ _2\"></span>ing occupational pension plans, published at the end of 2015, made various changes to t<span class=\"_ _e\"></span>he guaranteed return on defined-contr<span class=\"_ _2\"></span>ibution plans. For payments made after 1 January 2016, the law requires emp<span class=\"_ _e\"></span>loyers to guarantee an average annual return of at lea<span class=\"_ _2\"></span>st 1.75% (up to 3.75% depending on who contributes) over the course of <span class=\"_ _e\"></span><span class=\"ff42\">each employee\u2019s career.</span> For insured<span class=\"_ _2\"></span> plans the minimum guaranteed return until 31<span class=\"_ _e\"></span> December 2015 still ne<span class=\"_ _2\"></span>eds to be equivalent to at le<span class=\"_ _e\"></span>ast 3.25% for the employer\u2019s contr<span class=\"_ _2\"></span>ibution and 3.75% for the employee's contribution, with any shortfall<span class=\"_ _e\"></span><span class=\"ff3f\"> being covered by the employer.<span class=\"_ _e\"></span> </span>As a result o<span class=\"_ _2\"></span>f the above changes and as mentioned in the<span class=\"_ _e\"></span> accounting policies, all defined-contribution pension plans under Belgian pension legislation are classified as defined-benefit plans for accounting purposes, due to the legal minimum return to be guaranteed by the employer<span class=\"_ _2\"></span>, which represents a plan amendment. They <span class=\"_ _e\"></span>are accounted for using the Projected Unit Credit method <span class=\"_ _e\"></span>(PUC-method). For each plan, the<span class=\"_ _2\"></span> fair value of assets equals the sum of the accrued individual reserves (if any) and the value of the collectiv<span class=\"_ _20\"></span>e fu<span class=\"_ _2\"></span>nd(s) (if any), hence no ap<span class=\"_ _2\"></span>plication of IAS 19 \u00a7 115. In addition, with the exception of Enerbel, the <span class=\"_ _e\"></span>defi<span class=\"ls5b\">ned</span>-c<span class=\"_ _e\"></span>ontributions (<span class=\"ls1c\">DC</span>) plans are not backloaded, as su<span class=\"_ _2\"></span>ch these plans are valued without projection of future contributions. The Enerbel DC plan is backloaded and <span class=\"_ _e\"></span>this plan is valued with proje<span class=\"_ _2\"></span>ction of future contributions<span class=\"_ _e\"></span>.<span class=\"fs11\">  </span>Elia Transm<span class=\"_ _2\"></span>ission Belgium has transferred certain acquired reserves guaranteed by the insurers to 'Cash balance <span class=\"_ _20\"></span><span class=\"ff42\">\u2013</span> b<span class=\"_ _2\"></span>est of' plans since 2016. The main objective o<span class=\"_ _2\"></span>f these plans is to guarantee for every subscriber a minimum guaranteed return of 3.25% on the acquired reserve<span class=\"_ _2\"></span>s until retirement age. <span class=\"_ _e\"></span> Both emplo<span class=\"_ _2\"></span>yee' and employer' contributions are paid on a monthly basis for the base plans. The employee' contribution is dedu<span class=\"_ _e\"></span>cted from the<span class=\"ls1c\">ir</span> <span class=\"_ _2\"></span>salary and paid to the insurer by the employer. The amount of future cash flows <span class=\"_ _e\"></span>depends on wage growth. DEFINED-BENEFIT PLANS For a<span class=\"_ _2\"></span> closed population, collective agreements in the electricity and gas industries provide \u2018pension supplements\u2019 based on t<span class=\"_ _e\"></span><span class=\"ff3f\">he annual </span>salary and an emplo<span class=\"_ _2\"></span>yee\u2019s career within a company (partial<span class=\"_ _e\"></span>ly revertib<span class=\"_ _2\"></span>l<span class=\"ff3f\">e<span class=\"_ _e\"></span> to the inheritor in case of early death of the employee).The </span>benefits gran<span class=\"_ _2\"></span>ted are linked to Elia\u2019s operating result. There is no external pension fund or group insurance for these liabil<span class=\"_ _e\"></span><span class=\"ff3f\">ities, which </span>means that n<span class=\"_ _2\"></span>o reserves are constituted with third parties. <span class=\"_ _e\"></span>The obligations are classified as a defined-benefit. The co<span class=\"_ _2\"></span>llective agreement determines that active staff hired between 1 Ja<span class=\"_ _e\"></span>nuary 1993 and 31 December 2001 and all managerial/e<span class=\"_ _2\"></span>xecutive staff hired prior to 1 May 1999 wil<span class=\"_ _e\"></span>l be granted the same guarantees via a defined-benefit pension scheme (Elgabel and Pensiobel <span class=\"ff42\">\u2013</span> closed plan<span class=\"_ _2\"></span>s). Obligations under these d<span class=\"_ _e\"></span>efined-benefit pension plans are funded by a number of pension funds for the electricity and ga<span class=\"_ _2\"></span>s industries and by insurance companies.<span class=\"_ _e\"></span> As mentioned abo<span class=\"_ _2\"></span>ve, Elia Transmission Belgium has transferred certain acquired reserves guaranteed by the insurers to 'Cash balance \u2013<span class=\"ff3f\"> best o<span class=\"_ _2\"></span>f' plans since 2016. As this guarantee is an empl<span class=\"_ _e\"></span>oyer obligation, these plans represent defined-benefit plans. </span>Both emplo<span class=\"_ _2\"></span>yees' and employers' contributions are paid o<span class=\"_ _e\"></span>n a monthly basis for the base plans. The emp<span class=\"_ _2\"></span>loyee's contribution is deducted from the salary and<span class=\"_ _2\"></span> paid to the insurer by the employer.<span class=\"_ _e\"></span> OTHER PERSONNEL OBLIGATIONS <span class=\"_ _250\"> </span> Elia Transm<span class=\"_ _2\"></span>ission (Belgium) has also granted staff certain early<span class=\"_ _e\"></span>-retirement schemes and other post-employment benefits such as reimbursement of med<span class=\"_ _2\"></span>ical expenses and a contribution to <span class=\"_ _e\"></span>their energy bills, as well as other long-term benefits (seniority payments). Not all of the<span class=\"_ _2\"></span>se benefits are funded and, in accordance with I<span class=\"_ _e\"></span>AS<span class=\"_ _e\"></span> 19, these<span class=\"_ _2\"></span> post-employment benefits are classified as defined-benefit plans.<span class=\"_ _e\"></span> GERMANY<span class=\"ff3f fs8\"> </span>DEFINED CONTRIBUTION PLANS In <span class=\"_ _2\"></span>the case <span class=\"_ _2\"></span>of externally fin<span class=\"_ _2\"></span>anced defined contribution <span class=\"_ _2\"></span>plans, 5<span class=\"_ _2\"></span>0Hertz Tr<span class=\"_ _e\"></span><span class=\"ff42\">ansmission <span class=\"_ _2\"></span>(Germany)\u2019s obligation <span class=\"_ _2\"></span>is limited to <span class=\"_ _2\"></span>paying <span class=\"_ _2\"></span>the agreed<span class=\"_ _e\"></span> </span>contribu<span class=\"_ _2\"></span>tions. <span class=\"_ _e\"></span>For <span class=\"_ _e\"></span>those <span class=\"_ _e\"></span>defined <span class=\"_ _e\"></span>contribution <span class=\"_ _e\"></span>plans<span class=\"_ _e\"></span> recog<span class=\"_ _e\"></span>nised in<span class=\"_ _e\"></span> the<span class=\"_ _e\"></span> fo<span class=\"_ _e\"></span>rm <span class=\"_ _e\"></span>of <span class=\"_ _e\"></span>direct <span class=\"_ _e\"></span>guarantees, <span class=\"_ _e\"></span>there a<span class=\"_ _e\"></span>re <span class=\"_ _e\"></span>pledged <span class=\"_ _e\"></span>congruent <span class=\"_ _20\"></span><span class=\"ff42\">employer\u2019s </span>liability insuran<span class=\"_ _2\"></span>ce policies in place.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Pension o<span class=\"_ _2\"></span>bligations for executives (agreement with staff representatives from 2003 onwards): individual contractual pension </span></span>obligation<span class=\"_ _2\"></span>s based on an agreement with representatives;<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Pension o<span class=\"_ _2\"></span>bligations for executives (agreement with staff representatives from 19 August 200<span class=\"_ _e\"></span>8 onwards): individual contra<span class=\"_ _2\"></span>ctual </span></span>pension obligatio<span class=\"_ _2\"></span>ns relating to a company pension plan with the Vattenfall Europe Group;<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Collective b<span class=\"_ _2\"></span>argaining agreement on the company pension scheme: obligations based on the collective bargaining agreement </span></span>made in<span class=\"_ _2\"></span> relation to <span class=\"ff42\">50Hertz Transmission\u2019s company pension scheme, concluded on 28</span> N<span class=\"_ _e\"></span>ovember 2007; \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Direct insu<span class=\"_ _2\"></span>rance: direct insurance policies for all former employees who worked at Vereinigte Energ<span class=\"_ _2\"></span>iewerke<span class=\"_ _e\"></span> AG (V<span class=\"_ _e\"></span>EAG) from </span></span>1993 to 31 December 2004, with the e<span class=\"_ _2\"></span>xception of ma<span class=\"_ _e\"></span>nagers; \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Individu<span class=\"_ _2\"></span>al commitments: individual commitments which are financed exclusively by external pension funds (welfare fund and </span></span>pension fund). DEFINED-BENEFIT PLANS Defined-benefit<span class=\"_ _2\"></span> plans entitle employees to su<span class=\"_ _e\"></span>bmit direct pension claims <span class=\"ls1d\">to</span> 50Hertz Transmission. Provisions for these are recognised in the statemen<span class=\"_ _2\"></span>t of financial position. If plan assets are creat<span class=\"_ _e\"></span>ed for the so<span class=\"_ _2\"></span>le purpose of fulfilling pension obligations, the a<span class=\"_ _e\"></span>mount is offset against the present <span class=\"_ _2\"></span>value of the obligation. The following <span class=\"_ _e\"></span>defined-benefit plans exist in Germany:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Grou<span class=\"_ _2\"></span>p works agreement regarding the company pension <span class=\"_ _e\"></span>scheme </span></span>In accordance<span class=\"_ _2\"></span> with the group works agreement regarding <span class=\"_ _e\"></span>the company pension scheme, employees are granted a company pension plan on the basis of a<span class=\"_ _2\"></span> defined-contribution plan (effective <span class=\"_ _e\"></span>1 January 2007). This a<span class=\"_ _2\"></span>greement applies to all employees within the meaning of Sec. 5 (1) o<span class=\"_ _2\"></span>f the German Work Constitution Act (BetrVG) and came into effect at the Company on 1 January 2007. Participati<span class=\"_ _e\"></span>on in the scheme is vo<span class=\"_ _2\"></span>luntary. The scheme grants pension benefits<span class=\"_ _e\"></span> to employees once they reach the statutory retirement age, once they take early re<span class=\"_ _2\"></span>tirement from statutory pension insurance, and in the event of occupational disability f<span class=\"_ _e\"></span>or death. Current pens<span class=\"_ _e\"></span>ion benefits are increased by 1% p.a., so the sch<span class=\"_ _2\"></span>eme is classified as a define<span class=\"_ _e\"></span>d-benefit plan. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">TVV Energie </span></span>This pen<span class=\"_ _2\"></span>sion plan relates to direct guarantees resulting from a collective bargaining agreement concl<span class=\"_ _e\"></span>uded on 16 October 1992. It was closed to new hire<span class=\"_ _2\"></span>s on 1 January 1993. This contribution <span class=\"_ _e\"></span>plan app<span class=\"_ _2\"></span>lies to employees who worked at Vereinigte Energiewerke AG until 30 November 2001 an<span class=\"_ _2\"></span>d whose vested benefits were allocated to Vattenfall Europe Transmission GmbH (now <span class=\"_ _e\"></span>50Hertz Transmission GmbH). The scheme covers pension<span class=\"_ _2\"></span> obligations, based on years of service and remuneration level and grants retirement and disability pensions, but no pen<span class=\"_ _2\"></span>sion for surviving dependants. It is n<span class=\"_ _e\"></span>ot possible to inde<span class=\"_ _2\"></span>x current post<span class=\"_ _e\"></span>-employment benefits falling due for the first time after 1 Januar<span class=\"_ _2\"></span>y 1993.<span class=\"_ _e\"></span> OTHER PERSONNEL OBLIGATIONS 50Hertz Tran<span class=\"_ _2\"></span>smission <span class=\"ff42\">also has following obligations, which are listed under \u2018Other personnel obligations\u2019:<span class=\"_ _e\"></span></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Obligatio<span class=\"_ _2\"></span>ns for long-service benefits;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Obligatio<span class=\"_ _2\"></span>ns from German phased retirement schemes;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Obligatio<span class=\"_ _2\"></span>ns for working lifetime accounts. </span></span>Not all of these b<span class=\"_ _2\"></span>enefits are funded and, in accordance with IAS 19, these post-employment benefits are classified as defined-benefit plans.  EMPLOYEE BEN<span class=\"_ _e\"></span>EFIT OBLIGA<span class=\"_ _2\"></span>TIONS AT GROUP LEVEL  The Group\u2019s <span class=\"_ _2\"></span>net liability for employee benefit obligations is as follows:<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>(in \u20ac million)<span class=\"ff40\"> </span>Pensions Other 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Present value of <span class=\"_ _2\"></span>funded defined benefit obligation<span class=\"_ _e\"></span> (249.6) (298.9) (93.3) (100.1) Fair va<span class=\"_ _2\"></span>lue of plan assets<span class=\"_ _e\"></span> 224.5 236.3 41.3 56.1 Net employee benefit<span class=\"_ _2\"></span> liability (25.1) (62.6) (51.9) (44.0) The net employee<span class=\"_ _2\"></span> benefit liability decreased in total by \u20ac29.5 million, of which \u20ac12.9 million on<span class=\"_ _2\"></span> Belgian level and<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>\u20ac<span class=\"_ _e\"></span>16.6 million on German level. The impact is mainly explained by the increase<span class=\"_ _2\"></span> in discoun<span class=\"_ _e\"></span>t rate compared with 2021 and the lower (negative) return on pla<span class=\"_ _2\"></span>n assets.<span class=\"_ _e\"></span> Movement in the p<span class=\"_ _2\"></span>resent value of the defined benefit obligation<span class=\"_ _e\"></span> Pensions Other (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>At the<span class=\"_ _2\"></span> beginning of the period<span class=\"_ _e\"></span> (298.9) (292.3) (100.1) (110.8) Curren<span class=\"_ _2\"></span>t service cost<span class=\"_ _e\"></span> (15.9) (15.2) (3.1) (10.4) Intere<span class=\"_ _2\"></span>st cost/income<span class=\"_ _e\"></span> (2.9) (1.7) (1.3) (0.6) Contributions fr<span class=\"_ _2\"></span>om plan participants<span class=\"_ _e\"></span> (1.0) (0.9) 0.0 0.0 Including remeasu<span class=\"_ _2\"></span>rement gains/(losses) in OCI and in Statement<span class=\"_ _2\"></span> of profit or loss, arising from<span class=\"_ _e\"></span> 1) Changes in demo<span class=\"_ _2\"></span>graphic assumptions<span class=\"_ _e\"></span> 0.0 0.0 0.0 0.0 2) Changes in f<span class=\"_ _2\"></span>inancial assumptions<span class=\"_ _e\"></span> 57.3 17.7 19.9 3.7 3) Changes from e<span class=\"_ _2\"></span>xperience adjustments (15.5) (5.3) (0.6) (0.3) Past service co<span class=\"_ _2\"></span>st 0.0 0.1 0.0 0.0 Payments from t<span class=\"_ _2\"></span>he plan 16.2 16.8 3.1 2.8 Transfers 11.1 (18.2) (11.1) 15.5 At the<span class=\"_ _2\"></span> end of the period<span class=\"_ _e\"></span> (249.6) (298.9) (93.3) (100.1) Movement in the fa<span class=\"_ _2\"></span>ir value of the plan assets<span class=\"_ _e\"></span> Pensions Other (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>At the<span class=\"_ _2\"></span> beginning of the period<span class=\"_ _e\"></span> 236.3 241.4 56.1 29.6 Intere<span class=\"_ _2\"></span>st income 2.4 1.0 0.0 0.1 Remeasurement ga<span class=\"_ _2\"></span>ins/losses in OCI arising from:<span class=\"_ _e\"></span> Return of plan<span class=\"_ _2\"></span> assets <span class=\"_ _e\"></span> (excluding<span class=\"_ _2\"></span> interest income on plan assets)<span class=\"_ _e\"></span> (35.7) 12.0 (0.3) 3.7 Contributions fr<span class=\"_ _2\"></span>om employer 14.4 10.2 5.9 9.7 Contributions fr<span class=\"_ _2\"></span>om plan participants<span class=\"_ _e\"></span> 1.0 0.9 0.0 0.0 Transfers 19.4 (13.1) (19.4) 15.8 Benefit payments (13.3) (16.2) (0.9) (2.7) At the<span class=\"_ _2\"></span> end of the period<span class=\"_ _e\"></span> 224.5 236.3 41.3 56.1 Amounts<span class=\"_ _2\"></span> recognised in comprehensive income<span class=\"_ _e\"></span> Pensions Other (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Service cost Curren<span class=\"_ _2\"></span>t service cost<span class=\"_ _e\"></span> (15.9) (15.2) 1.8 (4.1) Past service co<span class=\"_ _2\"></span>st 0.0 0.1 0.0 0.0 Settlements 0.6 0.6 0.1 0.1 Net interest on the<span class=\"_ _2\"></span> net defined-benefit liability/(asset)<span class=\"_ _e\"></span> (0.6) (0.7) (1.2) (0.5) Intere<span class=\"_ _2\"></span>st cost on defined-benefit obligation<span class=\"_ _e\"></span> (2.9) (1.7) (1.3) (0.6) Intere<span class=\"_ _2\"></span>st income on plan assets<span class=\"_ _e\"></span> 2.4 1.0 0.0 0.1 Other (0.0) (0.0) 0.0 0.3 Defined-benefit cos<span class=\"_ _2\"></span>ts recognised in profit or loss (15.9) (15.1) 0.6 (4.2) Actuarial gains(/loss<span class=\"_ _2\"></span>es) on defined obligations arising from:<span class=\"_ _e\"></span> 1) Changes in demo<span class=\"_ _2\"></span>graphic assumptions<span class=\"_ _e\"></span> 0.0 0.0 0.0 0.0 2) Changes in f<span class=\"_ _2\"></span>inancial assumptions<span class=\"_ _e\"></span> 57.3 17.7 19.9 3.1 3) Changes from e<span class=\"_ _2\"></span>xperience adjustments (15.5) (5.3) (0.6) (0.1) Return on plan assets (exclud<span class=\"_ _2\"></span>ing interest income on plan assets)<span class=\"_ _e\"></span> (35.7) 12.0 (0.3) 3.7 Remeasurement<span class=\"_ _2\"></span>s of net defined benefit (liability)/asset recogn<span class=\"_ _2\"></span>ised in other comprehensive income (OCI)<span class=\"_ _e\"></span> 6.1 24.5 19.0 6.6 Total (9.8) 9.4 19.6 2.4 Considerin<span class=\"_ _2\"></span>g the actuarial gains or losses recognised in other comprehensive income for the reimbursement right<span class=\"_ _e\"></span>s (-<span class=\"ff42\">\u20ac</span>8.9 million for 2022 - see herea<span class=\"_ _2\"></span>fter), the net impact of the remeasurement of <span class=\"_ _e\"></span>post-employments benefit obligations amounts to +<span class=\"ff42\">\u20ac</span><span class=\"ls78\">16</span>.<span class=\"_ _2\"></span>2 million. (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Breakdown o<span class=\"_ _2\"></span>f defined-<span class=\"_ _e\"></span>benefit obligation by<span class=\"_ _2\"></span> type of plan participants<span class=\"_ _e\"></span> (342.9) (399.0) Active plan participan<span class=\"_ _2\"></span>ts (272.7) (314.9) Term<span class=\"_ _2\"></span>inated plan participants with def.-b<span class=\"_ _e\"></span>enefit entitlements (21.5) (24.8) Retired p<span class=\"_ _2\"></span>lan participants and beneficiaries<span class=\"_ _e\"></span> (48.7) (59.3) Breakdown o<span class=\"_ _2\"></span>f defined-<span class=\"_ _e\"></span>benefit obligation by<span class=\"_ _2\"></span> type of benefits<span class=\"_ _e\"></span> (342.9) (399.0) Retirement an<span class=\"_ _2\"></span>d death benefits<span class=\"_ _e\"></span> (248.4) (288.2) Other post-employment benefit<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> (82.4) (57.3) Seniority pa<span class=\"_ _2\"></span>yments<span class=\"_ _e\"></span> (12.1) (53.6) When determin<span class=\"_ _2\"></span>ing the app<span class=\"_ _e\"></span>ropriate discount rate, the group considers the interest rates of corporate bonds in currencies consistent with the currencie<span class=\"_ _2\"></span>s of the post-employment benefit obligation w<span class=\"_ _e\"></span>ith at least an 'AA' rating or above, as set by an internationally acknowledged rating agency,<span class=\"_ _2\"></span> and extrapolated as needed along the yield curve to correspond with t<span class=\"_ _e\"></span>he expected term of the defined benefit obligation. A stress test is performe<span class=\"_ _2\"></span>d annually. This test verifies that the minimum funding requirements are covered to deal with 'shock<span class=\"_ _e\"></span>s' with probabilities of occurrence of 0.5%.<span class=\"fc1d\"> </span>The members (mostly) c<span class=\"_ _2\"></span>ontribute to the financing of the retirement benefits by paying a personal contribution.<span class=\"_ _e\"></span> Th<span class=\"ls0\">e annual balance of the defined benefit lump sum is financed by the employer through a recurrent allowance, wh<span class=\"_ _e\"></span>ich is expressed as a </span>percen<span class=\"_ _2\"></span>tage of the total payroll of the participants. This percentage is defined by the aggregate cost method and is reviewed <span class=\"_ _e\"></span>annually. This me<span class=\"_ _2\"></span>thod of financing involves smoothing future costs over the remaining period of the plan. The costs are estimat<span class=\"_ _e\"></span>ed on a projected basis (taking into accoun<span class=\"_ _2\"></span>t salary growth and inflation). The assumptions related to salary increase, inflation, employee turnover and age term are defined<span class=\"_ _2\"></span> on the basis of historical data from the Company. The mortality tables used are those corr<span class=\"_ _e\"></span>esponding to t<span class=\"_ _2\"></span>he observed experien<span class=\"_ _2\"></span>ce within the financing vehicle and take into consideration expected changes in mortality. The g<span class=\"_ _e\"></span>roup calculates the net interest on the net defined<span class=\"_ _2\"></span> benefit liability (asset) using the same high-quality bond discount rate (see above) <span class=\"_ _e\"></span>used to measure the de<span class=\"_ _2\"></span>fined benefit obligatio<span class=\"_ _2\"></span>n (net interest approach). These assumpti<span class=\"_ _e\"></span>ons are challenged on a regular basis. Exceptional events (<span class=\"_ _2\"></span>such as modifications ma<span class=\"_ _e\"></span>de to the plan, changes in assumptions and overly short coverage terms) can lead to outstand<span class=\"_ _2\"></span>ing payments from the sponsor.<span class=\"_ _e\"></span> The defined<span class=\"_ _2\"></span> benefit plans expose the Company to actuarial risks such as investment risk, interest<span class=\"_ _e\"></span>-rate risk, longevity risk and salary r<span class=\"_ _2\"></span>isk.<span class=\"_ _e\"></span><span class=\"ff40 fs11\"> </span>Investmen<span class=\"_ _e\"></span>t risk<span class=\"_ _2\"></span> The presen<span class=\"_ _2\"></span>t value of the defined benefit plan liability is calculated using a discount rate which is dete<span class=\"_ _e\"></span>rmined based on high-quality corporate bonds. The<span class=\"_ _2\"></span> difference between the actual return on assets and the interest income on plan assets is included in t<span class=\"_ _e\"></span><span class=\"ls5b\">he </span>remea<span class=\"_ _2\"></span>surements component (OCI). Currently the plan ha<span class=\"_ _e\"></span>s a relative<span class=\"_ _2\"></span>ly balanced range of investments, as shown b<span class=\"_ _e\"></span>elow<span class=\"_ _e\"></span>: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Investments quot<span class=\"_ _2\"></span>ed in an active market<span class=\"_ _e\"></span> 72.44% 71.02% Shares - <span class=\"_ _2\"></span>Eurozone<span class=\"_ _e\"></span> 13.24% 13.99% Shares - outside<span class=\"_ _2\"></span> Eurozone<span class=\"_ _e\"></span> 17.34% 17.98% Government bonds - Eurozone 0.94% 1.31% Other bonds - Eurozone 24.75% 24.85% Other bonds - outside Eurozone 16.18% 12.89% Unquoted invest<span class=\"_ _2\"></span>ments<span class=\"_ _e\"></span> 27.56% 28.98% Qualifying insuran<span class=\"_ _2\"></span>ce contracts<span class=\"_ _e\"></span> 12.23% 10.91% Property 2.21% 2.50% Cash and cash equivalen<span class=\"_ _2\"></span>ts 2.81% 2.82% Other 10.31% 12.76% Total (in %) 100.00% 100.00% Due to the long-term nature of the<span class=\"_ _2\"></span> plan liabilities, it is considered appropriate that a reasonable portion of the plan assets be in<span class=\"_ _2\"></span>vested in<span class=\"_ _20\"></span> equity securities to<span class=\"_ _2\"></span> leverage the return generated by the f<span class=\"_ _e\"></span>und. In<span class=\"_ _2\"></span> Germany, all plan assets are invested in insurance agreements.<span class=\"_ _20\"></span> Inter<span class=\"_ _e\"></span>est risk<span class=\"_ _2\"></span> A decrease<span class=\"_ _2\"></span> in the bond interest rate will increase the plan liability. However, this will be partially offset by an incr<span class=\"_ _e\"></span>ease in the return on the plan<span class=\"_ _2\"></span>\u2019s assets, of which approximately 95% is now invested in pension funds with an expected return of 3<span class=\"ff3f\">.1<span class=\"_ _e\"></span>2<span class=\"ls24\">%.</span> </span>Longev<span class=\"_ _2\"></span>ity risk <span class=\"ff3f\"> </span>The presen<span class=\"_ _2\"></span>t value of the defined benefit plan liability is calculated based on the best estimate of the<span class=\"_ _e\"></span> life expectancy of plan participants both during and a<span class=\"_ _2\"></span>fter their employment. An increase in the life expectancy of the plan participants will increase the plan's l<span class=\"_ _e\"></span>iability. The prospe<span class=\"_ _2\"></span>ctive mortality tables from the IA/BE <span class=\"_ _e\"></span>are used in Belgium and the 2018 Heubeck tables are uesed in Germany. Salary risk  The presen<span class=\"_ _2\"></span>t value of the defined benefit plan liability is calculated based on the future salaries of plan participants. As such, an increase in the salary of <span class=\"_ _2\"></span>the plan participants will increase the plan\u2019<span class=\"_ _e\"></span>s<span class=\"ff3f\"> liability. </span>ACTUARIAL ASSUMPTIONS (in % and years) Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Discount ra<span class=\"_ _2\"></span>te<span class=\"_ _e\"></span> - Pensions - defined benefit p<span class=\"_ _2\"></span>lans and cash balance - best off plans 3.75% 0.83% 3.59% 1.26% - Pensions - defined con<span class=\"_ _2\"></span>tribution plans<span class=\"_ _e\"></span> 3.77% 1.12% - - - Other 3.75% 1.14% 3.59% 1.26% Expected average salar<span class=\"_ _2\"></span>y increase (excluding inflation)<span class=\"_ _e\"></span> 1.00% 1.00% 2.75% 2.15% Expected infla<span class=\"_ _2\"></span>tion<span class=\"_ _e\"></span> 2.10% 1.75% 2.50% 2.00% Expected increase in<span class=\"_ _2\"></span> health benefits (including inflation)<span class=\"_ _e\"></span> 3.10% 2.75% 2.25% 2.25% Expected increase in<span class=\"_ _2\"></span> tariff advantages<span class=\"_ _e\"></span> 2.10% 1.75% - - Average a<span class=\"_ _2\"></span>ssumed retirement age - Employee 63<span class=\"ls0\"> </span>63<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>- Manager 65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>Life expectancy in y<span class=\"_ _2\"></span>ears of a pensioner retiring at age 65 at clos<span class=\"_ _2\"></span>ing date:*<span class=\"_ _e\"></span> Life expe<span class=\"_ _2\"></span>ctancy for a 65 year old male<span class=\"_ _e\"></span> 19.9 19.9 20.7 20.5 Life expe<span class=\"_ _2\"></span>ctancy for a 65 year old female<span class=\"_ _e\"></span> 23.6 23.6 24.1 24<span class=\"ls0\"> </span>*Mortality tables used: IABE in Belgium, 2018 Heubeck in Germany (in years ) Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Weighted a<span class=\"_ _2\"></span>verage duration of the defined benefit obligati<span class=\"_ _e\"></span>on 8.0                       <span class=\"_ _e\"></span>   <span class=\"ls0\">8.5 <span class=\"_ _e\"></span> </span>23.4 28.7 Weighted a<span class=\"_ _2\"></span>verage duration of the defined contribution plans<span class=\"_ _e\"></span> 9.7                       <span class=\"_ _e\"></span>   <span class=\"ls0\">9.7 <span class=\"_ _e\"></span> </span>n.r. n.r. Weighted a<span class=\"_ _2\"></span>verage duration of the post<span class=\"_ _e\"></span>-employment benefits other than pensions 13.2                       <span class=\"_ _e\"></span> <span class=\"ls0\">13.2 <span class=\"_ _e\"></span> </span>12.7 14.0 In Germany, the liability o<span class=\"_ _2\"></span>f the defined cont<span class=\"_ _e\"></span>ribution plans is complete<span class=\"_ _2\"></span>ly covered by the plan assets. Therefore, no w<span class=\"_ _e\"></span>eighted average duration is necessary and thus not <span class=\"_ _2\"></span>calculated.<span class=\"_ _e\"></span> The a<span class=\"_ _2\"></span>ctual return on plan assets in percentage terms f<span class=\"_ _e\"></span>or 20<span class=\"ls5b\">22</span> was negative, ranged between -2.6% and -18.0% (compared with a range<span class=\"_ _2\"></span> of 2.7% to 12.0%<span class=\"_ _e\"></span> in 2021<span class=\"ls8f\">).</span> Below is an over<span class=\"_ _2\"></span>view of the expected cash outflows for the DB plans:<span class=\"_ _e\"></span> Future expected cash<span class=\"_ _2\"></span> outflows<span class=\"_ _e\"></span> &lt; 12 months 1-5 years 6 <span class=\"ls0\">- 10 years </span>Pensions (4.6) (20.4) (25.3) Other (0.1) (0.3) (0.4) Total (in \u20ac million)<span class=\"ff40\"> </span>(4.7) (20.7) (25.7) There is some degree of uncertainty<span class=\"_ _2\"></span> linked to the above e<span class=\"_ _e\"></span>xpected cash outflows which can be explained by the following factors:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">differ<span class=\"_ _2\"></span>ences between assumptions and actual data can occur, e.g. retirement age and future salary increase;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the e<span class=\"_ _2\"></span>xpected cash outflows shown above are based on a closed population and therefore do not incorporate future new hir<span class=\"_ _2\"></span>es;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">futur<span class=\"_ _2\"></span>e premiums are calculated based on the last known aggregate cost rate, which is reviewed on an annual basis and varies </span></span>depend<span class=\"_ _2\"></span>ing on the return on plan assets, the actu<span class=\"_ _e\"></span>al salary increase<span class=\"_ _2\"></span> as opposed to the assumptions, and unexpected changes in<span class=\"_ _e\"></span> the population<span class=\"_ _2\"></span>. SENSITIVITY ANALYSIS Effect on def<span class=\"_ _2\"></span>ined benefit obligation<span class=\"_ _e\"></span> Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany Increase<span class=\"_ _2\"></span> (+) /<span class=\"_ _e\"></span> Increase<span class=\"_ _2\"></span> (+) / <span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span> Decrease (-) Decrease (-) Impact on the net<span class=\"_ _2\"></span> defined-benefit obligation of an increase in:<span class=\"_ _e\"></span> Discount ra<span class=\"_ _2\"></span>te (0.5% movement) 14.4 4.6 Average sa<span class=\"_ _2\"></span>lary increase <span class=\"_ _e\"></span>- excl. inflation (0.5% movement) (9.2) (2.6) Inflation (0.25<span class=\"_ _2\"></span>% movement)<span class=\"_ _e\"></span> (5.5) (0.2) Increase of h<span class=\"_ _2\"></span>ealthcare care benefits (1.0% movement)<span class=\"_ _e\"></span> (0.1) n.r. Life expe<span class=\"_ _2\"></span>ctancy of pensions (1 year)<span class=\"_ _e\"></span> (3.3) (0.8) REIMBURSEMENT RIGHTS (BELGIUM) As described<span class=\"_ _2\"></span> in Note 6.6, a non-current asset (within other financial assets) is recognised as reimbursement <span class=\"_ _e\"></span>rights linked to the defined benefit obligatio<span class=\"_ _2\"></span>n for the population benefitting from the interest scheme and medical plan liabilities and tariff benefits f<span class=\"_ _e\"></span>or retired Elia employee<span class=\"_ _2\"></span>s. Each change in these liabilities equally affects the corresponding reimburse<span class=\"_ _e\"></span>ment rights under non-current other financial assets. The change<span class=\"_ _2\"></span> in reimbursement rights is presented below:<span class=\"_ _e\"></span> Movement in the p<span class=\"_ _2\"></span>resent value of the reimbursement r<span class=\"_ _e\"></span>ight<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> Pensions Other (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>At the<span class=\"_ _2\"></span> beginning of the period<span class=\"_ _e\"></span> (19.0) (22.6) (27.2) (31.2) Curren<span class=\"_ _2\"></span>t service costs<span class=\"_ _e\"></span> Intere<span class=\"_ _2\"></span>st cost/income<span class=\"_ _e\"></span> (0.1) (0.1) (0.3) (0.2) Actuarial gains(/loss<span class=\"_ _2\"></span>es) on defined obligations arising from:<span class=\"_ _e\"></span> 1) Changes in demo<span class=\"_ _2\"></span>graphic assumptions<span class=\"_ _e\"></span> 0.0 0.0 0.0 0.0 2) Changes in financial assumptions 3.0 0.7 8.4 2.2 3) Changes from e<span class=\"_ _2\"></span>xperience adjustments 0.0 0.4 (2.4) 0.5 Payments from t<span class=\"_ _2\"></span>he plan 2.2 2.5 1.8 1.6 At the<span class=\"_ _2\"></span> end of the period<span class=\"_ _e\"></span> (14.0) (19.0) (19.7) (27.2) The sum of \u2018Pen<span class=\"_ _2\"></span>sions\u2019 (\u20ac14.0 million) and \u2018Other\u2019 (\u20ac19.7 <span class=\"_ _e\"></span>million) re<span class=\"_ _2\"></span>imbursement rights amounted to \u20ac33.7 million i<span class=\"_ _e\"></span>n 2021<span class=\"_ _2\"></span> (2020: \u20ac 46.2 million), which<span class=\"_ _2\"></span> reconciles with the reimbursement rights listed in Note 6.6.<span class=\"_ _e\"></span> Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEmployeeBenefitsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__35-1": {
   "value": "DEPRECIATI<span class=\"_ _e\"></span>ON, AM<span class=\"_ _2\"></span>ORTISATION, IMPAIRMENT AND CHA<span class=\"_ _2\"></span>NGES IN <span class=\"_ _e\"></span>PROVISIONS (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Amortisation<span class=\"_ _2\"></span> of intangible assets<span class=\"_ _e\"></span> 30.2 24.5 Depreciation of prop<span class=\"_ _2\"></span>erty, plant and equipment<span class=\"_ _e\"></span> 483.6 443.1 Total depreciation and a<span class=\"_ _2\"></span>mortisation<span class=\"_ _e\"></span> 513.7 467.5 Impairment of inven<span class=\"_ _2\"></span>tories<span class=\"_ _e\"></span> 0.0 0.6 Total impairment 0.0 0.6 Provisions for<span class=\"_ _2\"></span> litigations<span class=\"_ _e\"></span> (1.5) (0.5) Environmental provisions 0.3 (0.2) Other provision<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> (0.0) 0.0 Changes in p<span class=\"_ _2\"></span>rovisions<span class=\"_ _e\"></span> (1.3) (0.8) Depreciat<span class=\"_ _2\"></span>ion, amortisation, impairment and changes in provisions<span class=\"_ _e\"></span> 512.4 467.4 The total \u2018depreciation, amortisa<span class=\"_ _2\"></span>tion, impairment and changes in provisions\u2019 increased from \u20ac467.4 <span class=\"_ _e\"></span>million in 2021 to \u20ac512.4 million in 2022<span class=\"ls0\">, mainly because of an increase in depreciation of property, plant and equipment due to increasing fixed assets.<span class=\"_ _e\"></span> </span>A detailed descriptio<span class=\"_ _2\"></span>n and movement schedule i<span class=\"_ _e\"></span>s provided in other sections for 'Intangible assets' (see Note 6.2), 'Property, plant and equipment' (see<span class=\"_ _2\"></span> Note 6.1) and 'Provisions' (see Note <span class=\"_ _e\"></span>6.15<span class=\"ls8f\">).</span>6.1. <span class=\"_ _87\"> </span>Property, plant and equipment (in \u20ac million)<span class=\"ff40\"> </span>Leasing Machinery Furniture Other Assets Land and and and and tangible<span class=\"_ _2\"></span> under Total buildings similar equipment vehic<span class=\"_ _2\"></span>les<span class=\"_ _e\"></span> assets construct<span class=\"_ _2\"></span>ion rights ACQUISITION VALUE Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> 430.8 11,179<span class=\"_ _2\"></span>.4<span class=\"_ _e\"></span> 343.8 31.5 117.0 1,713.0 13,815<span class=\"_ _2\"></span>.6<span class=\"_ _e\"></span> Additions 10.6 179.8 36.0 0.9 49.6 956.0 1,232.8 Disposals (3.3) (87.1) (42.6) (0.2) (0.4) 0.0 (133.6) Transfers 27.6 503.0 35.1 2.9 0.0 (570.1) (1.5) Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021<span class=\"ls0\"> </span>465.8 11,775<span class=\"_ _2\"></span>.0<span class=\"_ _e\"></span> 372.3 35.1 166.1 2,098.8 14,913<span class=\"_ _2\"></span>.2<span class=\"_ _e\"></span> Balance at 1 Janua<span class=\"_ _2\"></span>ry 2022<span class=\"_ _e\"></span> 465.8 11,775<span class=\"_ _2\"></span>.0<span class=\"_ _e\"></span> 372.3 35.1 166.1 2,098.8 14,913<span class=\"_ _2\"></span>.2<span class=\"_ _e\"></span> Additions 9.3 334.0 34.7 0.1 (15.6) 1,130.1 1,492.6 Disposals (1.8) (82.6) (8.4) 0.0 0.5 (0.7) (93.0) Transfers 3.6 718.9 105.6 11.1 0.0 (838.0) 1.1 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022<span class=\"ls0\"> </span>476.8 12,745<span class=\"_ _2\"></span>.3<span class=\"_ _e\"></span> 504.2 46.4 151.0 2,390.1 16,313<span class=\"_ _2\"></span>.8<span class=\"_ _e\"></span> ACCUMULATED DEPRECIATION AND IMPAIRMENT Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> (36.1) (3,416.0) (205.7) (29.2) (34.2) 0.0 (3,721.2) Depreciation (6.6) (381.5) (39.7) (1.1) (14.8) (443.6) Disposals 2.2 68.6 39.7 0.1 0.4 111.<span class=\"ls0\">1 </span>Transfers 0.0 2.3 0.0 (2.3) 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021<span class=\"ls0\"> </span>(40.5) (3,726.6) (205.7) (32.4) (48.6) 0.0 (4,053.7) Balance at 1 Janua<span class=\"_ _2\"></span>ry 2022<span class=\"_ _e\"></span> (40.5) (3,726.6) (205.7) (32.4) (48.6) 0.0 (4,053.7) Depreciation (6.2) (404.1) (59.1) (0.6) (13.5) (483.6) Disposals 1.2 59.4 8.1 0.0 (0.5) 68.2 Transfers 0.0 11.0 0.0 (11.0) 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022<span class=\"ls0\"> </span>(45.5) (4,060.3) (256.7) (44.0) (62.5) 0.0 (4,469.1) CARRYING AMOUNT Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 394.7 7,763.4 138.1 2.3 82.8 1,713.1 10,094<span class=\"_ _2\"></span>.4<span class=\"_ _e\"></span> Balance at 31 December<span class=\"_ _2\"></span> 2021 425.3 8,048.4 166.6 2.8 117.5 2,098.9 10,859<span class=\"_ _2\"></span>.5<span class=\"_ _e\"></span> Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 425.3 8,048.4 166.6 2.8 117.5 2,098.9 10,859<span class=\"_ _2\"></span>.5<span class=\"_ _e\"></span> Balance at 31 December<span class=\"_ _2\"></span> 2022 431.4 8,684.9 247.4 2.3 88.5 2,390.1 11,844<span class=\"_ _2\"></span>.7<span class=\"_ _e\"></span> Large-scale (onshore and o<span class=\"_ _2\"></span>ffshore) infrastructure projects<span class=\"_ _e\"></span> in both Belgium and Germany are underway. These<span class=\"_ _2\"></span> projects are focusing on<span class=\"_ _e\"></span> strengthening both<span class=\"_ _2\"></span> the Belgian and German grids, d<span class=\"_ _e\"></span>eveloping the necessary offshore infrastructures to allow the integration of increasing<span class=\"_ _2\"></span> amounts of renewable energy into the grid and the digitalization of the infrastructure. The acceleration of<span class=\"_ _e\"></span> the energy transition and the current in<span class=\"_ _2\"></span>flationary environment are driving the investments of the Group.<span class=\"_ _e\"></span> In Belgium, <span class=\"_ _2\"></span>Elia Transmissi<span class=\"ff42\">on made investments totalling <span class=\"_ _e\"></span>\u20ac403.2 million in property, p<span class=\"_ _2\"></span>lant and equipment. In 2022, <span class=\"_ _e\"></span>159 replacement </span>projects o<span class=\"_ _2\"></span>ccurred across the Belgian grid, amounting to a total investment of \u20ac113.4 million. Around \u20ac60 million was invested<span class=\"ff3f\"> in </span>suppor<span class=\"_ _2\"></span>ting the digitalisation of our infrastructure and the d<span class=\"_ _e\"></span>evelopment of new tools. The reinforcement <span class=\"_ _2\"></span>works betwe<span class=\"_ _e\"></span>en Avelgem and Avelin, which forms pa<span class=\"_ _2\"></span>rt of the 380 kV backbone between Mercator and France, had been successfully finalised by the end of th<span class=\"_ _e\"></span>e year. Construction wor<span class=\"ff42\">ks continued along the Massenhoven Van Eyck Corridor (\u20ac32.7 million) and the Mercato<span class=\"_ _2\"></span>r Bruegel <span class=\"_ _e\"></span>Corridor (\u20ac33.9 </span>million). An im<span class=\"_ _2\"></span>portant milestone was reached with the commissioning of a new 380 kV GIS substation, two 380 kV phase shifters a<span class=\"_ _e\"></span>nd a 380 kV compens<span class=\"ff42\">ator in Zand<span class=\"_ _2\"></span>vliet (\u20ac12.1 million). In Q3<span class=\"ff3f\">-20<span class=\"_ _e\"></span>22, work began in Rimi\u00e8re on the construction of a new 380 kV subst<span class=\"_ _2\"></span>ation and </span></span>the extension o<span class=\"_ _2\"></span>f the existing 220 kV substation (\u20ac11.9 mill<span class=\"_ _e\"></span>ion); th<span class=\"_ _2\"></span>is project aims to create the required hosting capacity fo<span class=\"_ _e\"></span><span class=\"ff3f\">r the new CRM </span>power p<span class=\"_ _2\"></span>lants in Les Awirs &amp; Seraing by 2025.<span class=\"_ _e\"></span> In Germany, 50Hertz<span class=\"_ _2\"></span> Transmission invested \u20ac<span class=\"ff3f\">1,0<span class=\"_ _e\"></span>89.3 million in proper<span class=\"_ _2\"></span>ty, plant and equipment. The most significant onshore investment </span>is <span class=\"ff42\">the DC line SuedOstLink <span class=\"_ _2\"></span>(\u20ac210.0 million). It plays an important role <span class=\"ff3f\">in connecting the growing (offshore) production in the north of </span></span>German<span class=\"_ _2\"></span>y with the consumption centres in the South. In or<span class=\"_ _e\"></span>der to reinforce the existin<span class=\"_ _2\"></span>g grid, the upgrading of high<span class=\"_ _e\"></span>-vol<span class=\"_ _e\"></span>tage pylons to boost opera<span class=\"_ _2\"></span>tional safety was accelerated in 2022 (\u20ac54.7<span class=\"ff3f\"> million<span class=\"_ _e\"></span>). Another important milestone was reached for the replacement of the old </span>Uckermar<span class=\"_ _2\"></span>k line with the successful settlement of a lawsuit after 17 years. The investment for this reinforcement consists of <span class=\"_ _e\"></span>the overhead line in the<span class=\"_ _2\"></span> southern Uckermark region (\u20ac5<span class=\"ff3f\">3.1 <span class=\"_ _e\"></span></span>million) and the overhead line in the northern Uckermar<span class=\"_ _2\"></span>k region (\u20ac46.9<span class=\"_ _e\"></span><span class=\"ff3f\"> million). Other </span>important on<span class=\"_ _2\"></span>shore projects to strengthen our onshore grid<span class=\"_ _e\"></span> are the re<span class=\"_ _2\"></span>structuring of the substation Lauchst\u00e4dt with S<span class=\"_ _e\"></span>TATCOM and MSCDN (\u20ac35.0<span class=\"_ _2\"></span> million) and the restructu<span class=\"_ _e\"></span>ring and reinforcement of the<span class=\"_ _2\"></span> overhead line between Wolmirstedt and G\u00fcs<span class=\"_ _e\"></span>trow (\u20ac34.6 million). Offshore investments mainly fo<span class=\"_ _2\"></span>cused on the Ostwind 2 project (\u20ac186.3 million), with the next offshore wind farm connection (O<span class=\"ff3f\">stwind <span class=\"_ _e\"></span>3) </span>already advan<span class=\"_ _2\"></span>cing along the <span class=\"ff42\">project pipeline (\u20ac82.5 million).<span class=\"_ _e\"></span></span> During 2022, \u20ac24.2<span class=\"_ _2\"></span> million of borrowing costs were capitalised on assets under construction. An amount of \u20ac6.1 million based <span class=\"_ _e\"></span><span class=\"ff3f\">on an </span>average interest rate o<span class=\"_ _2\"></span>f 1.91% originated <span class=\"ff42\">from th<span class=\"_ _e\"></span>e Elia Transmission Belg<span class=\"_ _2\"></span>ium segment (\u20ac7.8 <span class=\"_ _e\"></span><span class=\"ff3f\">million at 2.03% in 2021). An amount of </span></span>\u20ac18.1 million ba<span class=\"_ _2\"></span>sed on an average interest rate of 1.44% was accounted for in the 50Hertz Transmission segment (\u20ac13.5 million<span class=\"_ _e\"></span><span class=\"ff3f\"> at </span>0.98% in 2021). There were<span class=\"_ _2\"></span> no mortgages, pledges or similar securities on PP&amp;<span class=\"_ _e\"></span>E relating to loans. Outstand<span class=\"_ _2\"></span>ing capital expenditure commitments are describ<span class=\"_ _e\"></span>ed in Note 8.2. The analysis of lease liabilities is presented in note 6.19.<span class=\"_ _e\"></span> Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.2. <span class=\"_ _87\"> </span>Intangible assets (in \u20ac million)<span class=\"ff40\"> </span>Development<span class=\"_ _2\"></span> Licenses/ Other intangib<span class=\"_ _2\"></span>le Total costs of<span class=\"_ _2\"></span> softw<span class=\"_ _e\"></span>are concessions assets ACQUISITION VALUE Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> 209.0 29.6 0.0 238.5 Additions 61.5 4.9 0.0 66.4 Disposals (2.7) 0.0 0.0 (2.7) Transfers 0.6 0.0 0.9 1.5 Balance at 31 Dece<span class=\"_ _2\"></span>mber 2021 268.4 34.5 0.9 303.8 Balance at 1 Janua<span class=\"_ _2\"></span>ry 2022<span class=\"_ _e\"></span> 268.4 34.5 0.9 303.8 Additions 89.5 3.1 0.6 93.2 Disposals 0.0 0.0 0.0 0.0 Transfers (1.1) 0.0 0.0 (1.1) Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 356.8 37.6 1.6 395.9 ACCUMULATED DEPRECIATION AND IMPAIRMENT Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> (125.4) (7.8) 0.0 (133.1) Depreciation (21.4) (2.9) (0.2) (24.5) Disposals 2.5 (0.2) 0.0 2.4 Transfers 0.0 0.0 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 (144.2) (10.8) (0.2) (155.2) Balance at 1 January 2022 (144.2) (10.8) (0.2) (155.2) Depreciation (26.3) (3.5) (0.3) (30.2) Disposals 0.0 0.0 0.0 0.0 Transfers 0.0 0.0 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 (170.5) (14.4) (0.5) (185.4) CARRYING AMOUNT Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 83.6 21.8 0.0 105.<span class=\"ls0\">4 </span>Balance at 31 December<span class=\"_ _2\"></span> 2021 124.2 23.6 0.8 148.6 Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 124.2 23.6 0.8 148.6 Balance at 31 December<span class=\"_ _2\"></span> 2022 186.3 23.2 1.1 210.5 Software comprise<span class=\"_ _2\"></span>s both IT applications developed by the <span class=\"_ _e\"></span>Group for operating the grid and software for the Group's norma<span class=\"_ _2\"></span>l business opera<span class=\"_ _2\"></span>tions.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> invested a total amount of \u20ac93.2 million, of which \u20ac45.8 million in Elia Transmission Belgium, \u20ac46.7 mi<span class=\"ff3f\">lli<span class=\"_ _e\"></span>on in 50Hertz </span>Transmission a<span class=\"_ _2\"></span>nd \u20ac0.7 million in the non<span class=\"ff3f\">-<span class=\"_ _e\"></span>regulated activities and Nemo L<span class=\"_ _2\"></span>ink segment. <span class=\"_ _e\"></span> </span>During 2022, \u20ac0.6<span class=\"ff3f\"> m<span class=\"_ _2\"></span>illion in borrowing costs were capitalised on <span class=\"ff42\">software in development (compared with \u20ac0.3</span> <span class=\"_ _e\"></span>million in 2021) in the </span>Elia Transm<span class=\"_ _2\"></span>ission Belgium segment, based on an averag<span class=\"_ _e\"></span>e interest rate of 1.91% (1.92% in 2021<span class=\"ls8f\">).</span> No borrowing co<span class=\"_ _e\"></span>sts on software in development were ca<span class=\"_ _2\"></span>pitalised in the 50Hertz Transmission segment.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> does not hold individual intangible asse<span class=\"_ _e\"></span>ts that are material to its financial statements, except capacity e<span class=\"_ _e\"></span>ntitlements <span class=\"ls1c\">in</span> the Kontek cable<span class=\"_ _2\"></span> (Denmark) that amount to <span class=\"ff42\">\u20ac16.5 million (</span>wit<span class=\"_ _e\"></span>h a remaining useful life of 10 years (until 2033)).6.18. <span class=\"_ _92\"> </span>Fin<span class=\"_ _e\"></span>ancial instruments <span class=\"ff43\">\u2013</span> fair values The fo<span class=\"_ _2\"></span>llowing table shows the carrying amounts and fair values of financial assets and liabilities, including their levels in<span class=\"_ _e\"></span> the fair value hierar<span class=\"_ _2\"></span>chy<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> Carrying amount Fair value (in \u20ac million)<span class=\"ff40\"> </span>Balance at 31 December<span class=\"_ _2\"></span> 2021<span class=\"ls0\"> </span>Other financial assets 7.0  399.4  46.2  452.5  362.6  43.8  406.4  Equity instruments at fair value through other comprehensive income 43.8  43.8  43.8  43.8  Equity instruments at fair value through income 7.0  7.0  7.0  7.0  Derivatives 355.6  355.6  355.6  355.6  Regulatory assets 46.2  46.2  Trade and other receivables  (Current and Non-current) 861.8  861.8  Cash and cash equivalents 3,049.5  3,049.5  Loans and borrowings (Current and Non-Current) 0.0  0.0  0.0  (7,935.7) (7,935.7) (7,968.8) (247.8) (8,216.6) Unsecured bond issues (7,248.5) (7,248.5) (7,476.8) (247.8) (7,724.6) Unsecured financial bank loans and other loans (492.0) (492.0) (492.0) (492.0) Lease liabilities (118.8) (118.8) Accrued interests (76.4) (76.4) Trade and other payables (3,696.4) (3,696.4) Total 7.0 399.4 3,957.5 (11,632.0) (7,268.2) n.r. n.r. n.r. n.r. Balance at 31 December<span class=\"_ _2\"></span> 2022<span class=\"ls0\"> </span>Other financial assets 7.0  296.1  33.8  336.9  226.6  76.4  303.1  Equity instru<span class=\"_ _e\"></span>ments at fa<span class=\"_ _2\"></span>ir value through other comprehensive income 76.4  76.4  76.4  76.4  Equity instruments at fair value through income 7.0  7.0  7.0  7.0  Derivatives 219.7  219.7  219.7  219.7  Regulatory assets 33.8  33.8  Trade and other receivables (Current and Non-current) 1,367.1  1,367.1  Cash and cash equivalents 4,151.2  4,151.2  Loans and borrowings (Current and Non-Current) 0.0  0.0  0.0  (8,582.8) (8,582.8) (8,183.4) (172.9) (8,356.3) Unsecured bond issues (7,243.0) (7,243.0) (7,015.7) (172.9) (7,188.6) Unsecured financial bank loans and other loans (1,167.7) (1,167.7) (1,167.7) (1,167.7) Lease liabilities (90.2) (90.2) Accrued interests (81.9) (81.9) Other non-current liabilities  (24.7) (24.7) out of which, <span class=\"ff48\">Derivatives</span> (24.7) (24.7) (24.7) (24.7) Trade and other payables (4,804.2) (4,804.2) Total 7.0 2<span class=\"ls104\">71<span class=\"_ _e\"></span></span>.4 5,552.1 (13,387.0) (7,556.5) n.r. n.r. n.r. n.r. The above t<span class=\"_ _2\"></span>ables do not include fair value information for financial assets and liabilities not measured at fair value, such as cash and cash equ<span class=\"_ _2\"></span>ivalents, trade and other receivables, and trade and other payables, as their carrying amount is a reasona<span class=\"_ _e\"></span>ble approximation of fair value<span class=\"_ _2\"></span>. We consider that the carrying amount approxi<span class=\"_ _e\"></span>mates the fair value considering the financial and short-te<span class=\"_ _e\"></span>rm nature.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDepreciationAndAmortisationExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__40": {
   "value": "OTHER EXPEN<span class=\"_ _e\"></span>SES (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Taxes o<span class=\"_ _2\"></span>ther than income tax<span class=\"_ _e\"></span> 15.4 14.0 Loss on d<span class=\"_ _2\"></span>isposal/sale of property, plant and equipment<span class=\"_ _e\"></span> 17.8 19.1 Impairment on re<span class=\"_ _2\"></span>ceivables<span class=\"_ _e\"></span> 1.2 0.5 Other 10.0 7.7 Total 44.4 41.4 In 2022, the<span class=\"_ _2\"></span> share of Elia Transmission (Belgium) in the g<span class=\"_ _e\"></span><span class=\"ff42\">roup\u2019s other expen<span class=\"_ _2\"></span>ses was \u20ac2<span class=\"_ _e\"></span><span class=\"ff3f\">6.6 </span>million (\u20ac2<span class=\"ff3f\">1.6 million in 2021), 50Hertz </span></span>Transmission (<span class=\"_ _2\"></span>Germany)\u2019s total share amounted to \u20ac1<span class=\"ff3f\">7.<span class=\"_ _e\"></span>0 </span>million (\u20ac<span class=\"ff3f ls78\">19<span class=\"ls0\">.<span class=\"_ _2\"></span>7 million in 2021) and the share of the non-re<span class=\"_ _e\"></span>gulated activities and </span></span>Nemo Link <span class=\"_ _2\"></span>segment accounted for \u20ac0.<span class=\"ff3f\">9 <span class=\"_ _e\"></span></span>million (\u20ac0.<span class=\"ff3f\">1 million in 2021<span class=\"ls8f\">).</span> </span>Taxes o<span class=\"_ _2\"></span>ther than income tax mainly consist of property ta<span class=\"_ _e\"></span>xes.  Losses on<span class=\"_ _2\"></span> disposal for property, plant and equipment totalled \u20ac<span class=\"ff3f ls5b\">12<span class=\"ls0\">.8<span class=\"_ _e\"></span> </span></span>million for Elia Transmission (Belgium), compared with \u20ac<span class=\"_ _2\"></span>9.<span class=\"_ _e\"></span><span class=\"ff3f\">0 million </span>in <span class=\"ff42\">the previous <span class=\"_ _2\"></span>year. 50Hertz Transmission (Germany) recorded \u20ac<span class=\"ff3f\">5.0 million of losses on disposal for prope<span class=\"_ _e\"></span>rty, plant and equipment in<span class=\"_ _2\"></span> </span></span>2021<span class=\"ff42 ls0\">, from \u20ac1<span class=\"ff3f\">0.1 million in 202</span></span>1.<span class=\"_ _e\"></span><span class=\"ls0\"> </span>The amoun<span class=\"_ _2\"></span>t of impairment on trade receivables is explained in Note 8.1 \u2018Financial risk and derivative management\u2019.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherOperatingExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__46": {
   "value": "5.3. <span class=\"_ _87\"> </span>Net finance costs (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Finance inco<span class=\"_ _2\"></span>me 75.4 3.9 Intere<span class=\"_ _2\"></span>st income on cash and cash equivalents and granted loans<span class=\"_ _e\"></span> 4.2 1.1 Other f<span class=\"_ _2\"></span>inancial income<span class=\"_ _e\"></span> 71.2 2.8 Finance costs (119.0) (110.5) Intere<span class=\"_ _2\"></span>st expense on eurobonds and other bank borrowings<span class=\"_ _e\"></span> (112.0) (110.4) Intere<span class=\"_ _2\"></span>st expense on derivatives<span class=\"_ _e\"></span> (0.6) (0.6) Intere<span class=\"_ _2\"></span>st cost on leasing (1.3) (1.8) Other f<span class=\"_ _2\"></span>inancial costs (5.1) 2.3 Net finance costs (43.6) (106.6) Finance<span class=\"_ _2\"></span> income <span class=\"ff42\">increased from \u20ac3</span>.9 million in 2021 <span class=\"ff42\">to <span class=\"_ _e\"></span>\u20ac</span><span class=\"ls78\">75</span>.4<span class=\"_ _2\"></span> million in 2022<span class=\"ff42\">. 50Hertz Transmission (Germany)\u2019s contri</span>bution explains the var<span class=\"_ _2\"></span>iation with \u20ac73.9 million in 2022 compared<span class=\"ff3f\"> </span>t<span class=\"_ _e\"></span>o \u20ac2.1 million<span class=\"ff3f\"> in 2021. This variation is primarily driven by the re<span class=\"_ _e\"></span>valuation of provision </span>for congestion<span class=\"_ _2\"></span> income from interconnectors t<span class=\"_ _e\"></span>o be returned to grid customers based on an upwards re<span class=\"_ _2\"></span>vision of the i<span class=\"_ _e\"></span>nterest forward cur<span class=\"_ _2\"></span>ve.<span class=\"_ _e\"></span> The contribu<span class=\"_ _2\"></span>tion of Elia Transmission (Belgium) <span class=\"ff42\">is cl<span class=\"_ _e\"></span>ose to previous year (\u20ac1.3 million in 2022 compared </span> <span class=\"ff42\">\u20ac1.7 million</span> in 2021). The <span class=\"ls5b\">non</span>-regulated act<span class=\"_ _2\"></span>ivities and Nemo Link segment sh<span class=\"_ _e\"></span>owed <span class=\"ff42\">\u20ac</span>3.8 million <span class=\"ff42\">of financial income (\u20ac0.1 million in 2021).</span> The interest expen<span class=\"_ _2\"></span>ses on Eurobonds and other bank borrowing<span class=\"_ _e\"></span>s <span class=\"ff42\">increased by \u20ac1.6</span> million compared to the previous year. See Note 6.12 for more d<span class=\"_ _2\"></span>etails regarding the loans outstanding and the interest paid in 2022.<span class=\"_ _e\"></span> The interest cost on<span class=\"_ _2\"></span> leasing slightly decreased in comparison with the previous year. This is <span class=\"_ _e\"></span>explained by the lower value of financial lease liabilities. Other f<span class=\"_ _2\"></span>inancial costs decreased from -<span class=\"ff42\">\u20ac2.3</span> million <span class=\"ff42\">in 202<span class=\"_ _e\"></span>1 to \u20ac5.1 million in 2022</span><span class=\"ls1d\">. </span>In 2021, a net interest on German<span class=\"_ _e\"></span> regulatory issues (credit <span class=\"_ _2\"></span>amount of \u20ac6.5 million) was reported in this captio<span class=\"_ _e\"></span><span class=\"ff3f\">n in connection with the revenue for congestion management. As explained </span>here above, <span class=\"_ _2\"></span>in 2022, the financial income is reported in \u2018Other financial income\u2019.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Please see Note 6.13 for more deta<span class=\"_ _2\"></span>ils <span class=\"_ _e\"></span><span class=\"ls5b\">about</span> net <span class=\"_ _e\"></span>debt and loans.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinanceIncomeExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__45": {
   "value": "5.3. <span class=\"_ _87\"> </span>Net finance costs (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Finance inco<span class=\"_ _2\"></span>me 75.4 3.9 Intere<span class=\"_ _2\"></span>st income on cash and cash equivalents and granted loans<span class=\"_ _e\"></span> 4.2 1.1 Other f<span class=\"_ _2\"></span>inancial income<span class=\"_ _e\"></span> 71.2 2.8 Finance costs (119.0) (110.5) Intere<span class=\"_ _2\"></span>st expense on eurobonds and other bank borrowings<span class=\"_ _e\"></span> (112.0) (110.4) Intere<span class=\"_ _2\"></span>st expense on derivatives<span class=\"_ _e\"></span> (0.6) (0.6) Intere<span class=\"_ _2\"></span>st cost on leasing (1.3) (1.8) Other f<span class=\"_ _2\"></span>inancial costs (5.1) 2.3 Net finance costs (43.6) (106.6) Finance<span class=\"_ _2\"></span> income <span class=\"ff42\">increased from \u20ac3</span>.9 million in 2021 <span class=\"ff42\">to <span class=\"_ _e\"></span>\u20ac</span><span class=\"ls78\">75</span>.4<span class=\"_ _2\"></span> million in 2022<span class=\"ff42\">. 50Hertz Transmission (Germany)\u2019s contri</span>bution explains the var<span class=\"_ _2\"></span>iation with \u20ac73.9 million in 2022 compared<span class=\"ff3f\"> </span>t<span class=\"_ _e\"></span>o \u20ac2.1 million<span class=\"ff3f\"> in 2021. This variation is primarily driven by the re<span class=\"_ _e\"></span>valuation of provision </span>for congestion<span class=\"_ _2\"></span> income from interconnectors t<span class=\"_ _e\"></span>o be returned to grid customers based on an upwards re<span class=\"_ _2\"></span>vision of the i<span class=\"_ _e\"></span>nterest forward cur<span class=\"_ _2\"></span>ve.<span class=\"_ _e\"></span> The contribu<span class=\"_ _2\"></span>tion of Elia Transmission (Belgium) <span class=\"ff42\">is cl<span class=\"_ _e\"></span>ose to previous year (\u20ac1.3 million in 2022 compared </span> <span class=\"ff42\">\u20ac1.7 million</span> in 2021). The <span class=\"ls5b\">non</span>-regulated act<span class=\"_ _2\"></span>ivities and Nemo Link segment sh<span class=\"_ _e\"></span>owed <span class=\"ff42\">\u20ac</span>3.8 million <span class=\"ff42\">of financial income (\u20ac0.1 million in 2021).</span> The interest expen<span class=\"_ _2\"></span>ses on Eurobonds and other bank borrowing<span class=\"_ _e\"></span>s <span class=\"ff42\">increased by \u20ac1.6</span> million compared to the previous year. See Note 6.12 for more d<span class=\"_ _2\"></span>etails regarding the loans outstanding and the interest paid in 2022.<span class=\"_ _e\"></span> The interest cost on<span class=\"_ _2\"></span> leasing slightly decreased in comparison with the previous year. This is <span class=\"_ _e\"></span>explained by the lower value of financial lease liabilities. Other f<span class=\"_ _2\"></span>inancial costs decreased from -<span class=\"ff42\">\u20ac2.3</span> million <span class=\"ff42\">in 202<span class=\"_ _e\"></span>1 to \u20ac5.1 million in 2022</span><span class=\"ls1d\">. </span>In 2021, a net interest on German<span class=\"_ _e\"></span> regulatory issues (credit <span class=\"_ _2\"></span>amount of \u20ac6.5 million) was reported in this captio<span class=\"_ _e\"></span><span class=\"ff3f\">n in connection with the revenue for congestion management. As explained </span>here above, <span class=\"_ _2\"></span>in 2022, the financial income is reported in \u2018Other financial income\u2019.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Please see Note 6.13 for more deta<span class=\"_ _2\"></span>ils <span class=\"_ _e\"></span><span class=\"ls5b\">about</span> net <span class=\"_ _e\"></span>debt and loans.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinanceCostExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__44": {
   "value": "5.3. <span class=\"_ _87\"> </span>Net finance costs (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Finance inco<span class=\"_ _2\"></span>me 75.4 3.9 Intere<span class=\"_ _2\"></span>st income on cash and cash equivalents and granted loans<span class=\"_ _e\"></span> 4.2 1.1 Other f<span class=\"_ _2\"></span>inancial income<span class=\"_ _e\"></span> 71.2 2.8 Finance costs (119.0) (110.5) Intere<span class=\"_ _2\"></span>st expense on eurobonds and other bank borrowings<span class=\"_ _e\"></span> (112.0) (110.4) Intere<span class=\"_ _2\"></span>st expense on derivatives<span class=\"_ _e\"></span> (0.6) (0.6) Intere<span class=\"_ _2\"></span>st cost on leasing (1.3) (1.8) Other f<span class=\"_ _2\"></span>inancial costs (5.1) 2.3 Net finance costs (43.6) (106.6) Finance<span class=\"_ _2\"></span> income <span class=\"ff42\">increased from \u20ac3</span>.9 million in 2021 <span class=\"ff42\">to <span class=\"_ _e\"></span>\u20ac</span><span class=\"ls78\">75</span>.4<span class=\"_ _2\"></span> million in 2022<span class=\"ff42\">. 50Hertz Transmission (Germany)\u2019s contri</span>bution explains the var<span class=\"_ _2\"></span>iation with \u20ac73.9 million in 2022 compared<span class=\"ff3f\"> </span>t<span class=\"_ _e\"></span>o \u20ac2.1 million<span class=\"ff3f\"> in 2021. This variation is primarily driven by the re<span class=\"_ _e\"></span>valuation of provision </span>for congestion<span class=\"_ _2\"></span> income from interconnectors t<span class=\"_ _e\"></span>o be returned to grid customers based on an upwards re<span class=\"_ _2\"></span>vision of the i<span class=\"_ _e\"></span>nterest forward cur<span class=\"_ _2\"></span>ve.<span class=\"_ _e\"></span> The contribu<span class=\"_ _2\"></span>tion of Elia Transmission (Belgium) <span class=\"ff42\">is cl<span class=\"_ _e\"></span>ose to previous year (\u20ac1.3 million in 2022 compared </span> <span class=\"ff42\">\u20ac1.7 million</span> in 2021). The <span class=\"ls5b\">non</span>-regulated act<span class=\"_ _2\"></span>ivities and Nemo Link segment sh<span class=\"_ _e\"></span>owed <span class=\"ff42\">\u20ac</span>3.8 million <span class=\"ff42\">of financial income (\u20ac0.1 million in 2021).</span> The interest expen<span class=\"_ _2\"></span>ses on Eurobonds and other bank borrowing<span class=\"_ _e\"></span>s <span class=\"ff42\">increased by \u20ac1.6</span> million compared to the previous year. See Note 6.12 for more d<span class=\"_ _2\"></span>etails regarding the loans outstanding and the interest paid in 2022.<span class=\"_ _e\"></span> The interest cost on<span class=\"_ _2\"></span> leasing slightly decreased in comparison with the previous year. This is <span class=\"_ _e\"></span>explained by the lower value of financial lease liabilities. Other f<span class=\"_ _2\"></span>inancial costs decreased from -<span class=\"ff42\">\u20ac2.3</span> million <span class=\"ff42\">in 202<span class=\"_ _e\"></span>1 to \u20ac5.1 million in 2022</span><span class=\"ls1d\">. </span>In 2021, a net interest on German<span class=\"_ _e\"></span> regulatory issues (credit <span class=\"_ _2\"></span>amount of \u20ac6.5 million) was reported in this captio<span class=\"_ _e\"></span><span class=\"ff3f\">n in connection with the revenue for congestion management. As explained </span>here above, <span class=\"_ _2\"></span>in 2022, the financial income is reported in \u2018Other financial income\u2019.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Please see Note 6.13 for more deta<span class=\"_ _2\"></span>ils <span class=\"_ _e\"></span><span class=\"ls5b\">about</span> net <span class=\"_ _e\"></span>debt and loans.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInterestExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__43": {
   "value": "5.3. <span class=\"_ _87\"> </span>Net finance costs (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Finance inco<span class=\"_ _2\"></span>me 75.4 3.9 Intere<span class=\"_ _2\"></span>st income on cash and cash equivalents and granted loans<span class=\"_ _e\"></span> 4.2 1.1 Other f<span class=\"_ _2\"></span>inancial income<span class=\"_ _e\"></span> 71.2 2.8 Finance costs (119.0) (110.5) Intere<span class=\"_ _2\"></span>st expense on eurobonds and other bank borrowings<span class=\"_ _e\"></span> (112.0) (110.4) Intere<span class=\"_ _2\"></span>st expense on derivatives<span class=\"_ _e\"></span> (0.6) (0.6) Intere<span class=\"_ _2\"></span>st cost on leasing (1.3) (1.8) Other f<span class=\"_ _2\"></span>inancial costs (5.1) 2.3 Net finance costs (43.6) (106.6) Finance<span class=\"_ _2\"></span> income <span class=\"ff42\">increased from \u20ac3</span>.9 million in 2021 <span class=\"ff42\">to <span class=\"_ _e\"></span>\u20ac</span><span class=\"ls78\">75</span>.4<span class=\"_ _2\"></span> million in 2022<span class=\"ff42\">. 50Hertz Transmission (Germany)\u2019s contri</span>bution explains the var<span class=\"_ _2\"></span>iation with \u20ac73.9 million in 2022 compared<span class=\"ff3f\"> </span>t<span class=\"_ _e\"></span>o \u20ac2.1 million<span class=\"ff3f\"> in 2021. This variation is primarily driven by the re<span class=\"_ _e\"></span>valuation of provision </span>for congestion<span class=\"_ _2\"></span> income from interconnectors t<span class=\"_ _e\"></span>o be returned to grid customers based on an upwards re<span class=\"_ _2\"></span>vision of the i<span class=\"_ _e\"></span>nterest forward cur<span class=\"_ _2\"></span>ve.<span class=\"_ _e\"></span> The contribu<span class=\"_ _2\"></span>tion of Elia Transmission (Belgium) <span class=\"ff42\">is cl<span class=\"_ _e\"></span>ose to previous year (\u20ac1.3 million in 2022 compared </span> <span class=\"ff42\">\u20ac1.7 million</span> in 2021). The <span class=\"ls5b\">non</span>-regulated act<span class=\"_ _2\"></span>ivities and Nemo Link segment sh<span class=\"_ _e\"></span>owed <span class=\"ff42\">\u20ac</span>3.8 million <span class=\"ff42\">of financial income (\u20ac0.1 million in 2021).</span> The interest expen<span class=\"_ _2\"></span>ses on Eurobonds and other bank borrowing<span class=\"_ _e\"></span>s <span class=\"ff42\">increased by \u20ac1.6</span> million compared to the previous year. See Note 6.12 for more d<span class=\"_ _2\"></span>etails regarding the loans outstanding and the interest paid in 2022.<span class=\"_ _e\"></span> The interest cost on<span class=\"_ _2\"></span> leasing slightly decreased in comparison with the previous year. This is <span class=\"_ _e\"></span>explained by the lower value of financial lease liabilities. Other f<span class=\"_ _2\"></span>inancial costs decreased from -<span class=\"ff42\">\u20ac2.3</span> million <span class=\"ff42\">in 202<span class=\"_ _e\"></span>1 to \u20ac5.1 million in 2022</span><span class=\"ls1d\">. </span>In 2021, a net interest on German<span class=\"_ _e\"></span> regulatory issues (credit <span class=\"_ _2\"></span>amount of \u20ac6.5 million) was reported in this captio<span class=\"_ _e\"></span><span class=\"ff3f\">n in connection with the revenue for congestion management. As explained </span>here above, <span class=\"_ _2\"></span>in 2022, the financial income is reported in \u2018Other financial income\u2019.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Please see Note 6.13 for more deta<span class=\"_ _2\"></span>ils <span class=\"_ _e\"></span><span class=\"ls5b\">about</span> net <span class=\"_ _e\"></span>debt and loans.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInterestIncomeExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__42": {
   "value": "5.3. <span class=\"_ _87\"> </span>Net finance costs (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Finance inco<span class=\"_ _2\"></span>me 75.4 3.9 Intere<span class=\"_ _2\"></span>st income on cash and cash equivalents and granted loans<span class=\"_ _e\"></span> 4.2 1.1 Other f<span class=\"_ _2\"></span>inancial income<span class=\"_ _e\"></span> 71.2 2.8 Finance costs (119.0) (110.5) Intere<span class=\"_ _2\"></span>st expense on eurobonds and other bank borrowings<span class=\"_ _e\"></span> (112.0) (110.4) Intere<span class=\"_ _2\"></span>st expense on derivatives<span class=\"_ _e\"></span> (0.6) (0.6) Intere<span class=\"_ _2\"></span>st cost on leasing (1.3) (1.8) Other f<span class=\"_ _2\"></span>inancial costs (5.1) 2.3 Net finance costs (43.6) (106.6) Finance<span class=\"_ _2\"></span> income <span class=\"ff42\">increased from \u20ac3</span>.9 million in 2021 <span class=\"ff42\">to <span class=\"_ _e\"></span>\u20ac</span><span class=\"ls78\">75</span>.4<span class=\"_ _2\"></span> million in 2022<span class=\"ff42\">. 50Hertz Transmission (Germany)\u2019s contri</span>bution explains the var<span class=\"_ _2\"></span>iation with \u20ac73.9 million in 2022 compared<span class=\"ff3f\"> </span>t<span class=\"_ _e\"></span>o \u20ac2.1 million<span class=\"ff3f\"> in 2021. This variation is primarily driven by the re<span class=\"_ _e\"></span>valuation of provision </span>for congestion<span class=\"_ _2\"></span> income from interconnectors t<span class=\"_ _e\"></span>o be returned to grid customers based on an upwards re<span class=\"_ _2\"></span>vision of the i<span class=\"_ _e\"></span>nterest forward cur<span class=\"_ _2\"></span>ve.<span class=\"_ _e\"></span> The contribu<span class=\"_ _2\"></span>tion of Elia Transmission (Belgium) <span class=\"ff42\">is cl<span class=\"_ _e\"></span>ose to previous year (\u20ac1.3 million in 2022 compared </span> <span class=\"ff42\">\u20ac1.7 million</span> in 2021). The <span class=\"ls5b\">non</span>-regulated act<span class=\"_ _2\"></span>ivities and Nemo Link segment sh<span class=\"_ _e\"></span>owed <span class=\"ff42\">\u20ac</span>3.8 million <span class=\"ff42\">of financial income (\u20ac0.1 million in 2021).</span> The interest expen<span class=\"_ _2\"></span>ses on Eurobonds and other bank borrowing<span class=\"_ _e\"></span>s <span class=\"ff42\">increased by \u20ac1.6</span> million compared to the previous year. See Note 6.12 for more d<span class=\"_ _2\"></span>etails regarding the loans outstanding and the interest paid in 2022.<span class=\"_ _e\"></span> The interest cost on<span class=\"_ _2\"></span> leasing slightly decreased in comparison with the previous year. This is <span class=\"_ _e\"></span>explained by the lower value of financial lease liabilities. Other f<span class=\"_ _2\"></span>inancial costs decreased from -<span class=\"ff42\">\u20ac2.3</span> million <span class=\"ff42\">in 202<span class=\"_ _e\"></span>1 to \u20ac5.1 million in 2022</span><span class=\"ls1d\">. </span>In 2021, a net interest on German<span class=\"_ _e\"></span> regulatory issues (credit <span class=\"_ _2\"></span>amount of \u20ac6.5 million) was reported in this captio<span class=\"_ _e\"></span><span class=\"ff3f\">n in connection with the revenue for congestion management. As explained </span>here above, <span class=\"_ _2\"></span>in 2022, the financial income is reported in \u2018Other financial income\u2019.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Please see Note 6.13 for more deta<span class=\"_ _2\"></span>ils <span class=\"_ _e\"></span><span class=\"ls5b\">about</span> net <span class=\"_ _e\"></span>debt and loans.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInterestIncomeExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__41": {
   "value": "5.3. <span class=\"_ _87\"> </span>Net finance costs (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Finance inco<span class=\"_ _2\"></span>me 75.4 3.9 Intere<span class=\"_ _2\"></span>st income on cash and cash equivalents and granted loans<span class=\"_ _e\"></span> 4.2 1.1 Other f<span class=\"_ _2\"></span>inancial income<span class=\"_ _e\"></span> 71.2 2.8 Finance costs (119.0) (110.5) Intere<span class=\"_ _2\"></span>st expense on eurobonds and other bank borrowings<span class=\"_ _e\"></span> (112.0) (110.4) Intere<span class=\"_ _2\"></span>st expense on derivatives<span class=\"_ _e\"></span> (0.6) (0.6) Intere<span class=\"_ _2\"></span>st cost on leasing (1.3) (1.8) Other f<span class=\"_ _2\"></span>inancial costs (5.1) 2.3 Net finance costs (43.6) (106.6) Finance<span class=\"_ _2\"></span> income <span class=\"ff42\">increased from \u20ac3</span>.9 million in 2021 <span class=\"ff42\">to <span class=\"_ _e\"></span>\u20ac</span><span class=\"ls78\">75</span>.4<span class=\"_ _2\"></span> million in 2022<span class=\"ff42\">. 50Hertz Transmission (Germany)\u2019s contri</span>bution explains the var<span class=\"_ _2\"></span>iation with \u20ac73.9 million in 2022 compared<span class=\"ff3f\"> </span>t<span class=\"_ _e\"></span>o \u20ac2.1 million<span class=\"ff3f\"> in 2021. This variation is primarily driven by the re<span class=\"_ _e\"></span>valuation of provision </span>for congestion<span class=\"_ _2\"></span> income from interconnectors t<span class=\"_ _e\"></span>o be returned to grid customers based on an upwards re<span class=\"_ _2\"></span>vision of the i<span class=\"_ _e\"></span>nterest forward cur<span class=\"_ _2\"></span>ve.<span class=\"_ _e\"></span> The contribu<span class=\"_ _2\"></span>tion of Elia Transmission (Belgium) <span class=\"ff42\">is cl<span class=\"_ _e\"></span>ose to previous year (\u20ac1.3 million in 2022 compared </span> <span class=\"ff42\">\u20ac1.7 million</span> in 2021). The <span class=\"ls5b\">non</span>-regulated act<span class=\"_ _2\"></span>ivities and Nemo Link segment sh<span class=\"_ _e\"></span>owed <span class=\"ff42\">\u20ac</span>3.8 million <span class=\"ff42\">of financial income (\u20ac0.1 million in 2021).</span> The interest expen<span class=\"_ _2\"></span>ses on Eurobonds and other bank borrowing<span class=\"_ _e\"></span>s <span class=\"ff42\">increased by \u20ac1.6</span> million compared to the previous year. See Note 6.12 for more d<span class=\"_ _2\"></span>etails regarding the loans outstanding and the interest paid in 2022.<span class=\"_ _e\"></span> The interest cost on<span class=\"_ _2\"></span> leasing slightly decreased in comparison with the previous year. This is <span class=\"_ _e\"></span>explained by the lower value of financial lease liabilities. Other f<span class=\"_ _2\"></span>inancial costs decreased from -<span class=\"ff42\">\u20ac2.3</span> million <span class=\"ff42\">in 202<span class=\"_ _e\"></span>1 to \u20ac5.1 million in 2022</span><span class=\"ls1d\">. </span>In 2021, a net interest on German<span class=\"_ _e\"></span> regulatory issues (credit <span class=\"_ _2\"></span>amount of \u20ac6.5 million) was reported in this captio<span class=\"_ _e\"></span><span class=\"ff3f\">n in connection with the revenue for congestion management. As explained </span>here above, <span class=\"_ _2\"></span>in 2022, the financial income is reported in \u2018Other financial income\u2019.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Please see Note 6.13 for more deta<span class=\"_ _2\"></span>ils <span class=\"_ _e\"></span><span class=\"ls5b\">about</span> net <span class=\"_ _e\"></span>debt and loans.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinanceIncomeExpenseExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__48-1": {
   "value": "5.4. <span class=\"_ _87\"> </span>Income taxes RECOGNISED IN PROFIT OR LOSS The consolidated income sta<span class=\"_ _2\"></span>tement includes the following taxes:<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Curren<span class=\"_ _2\"></span>t year 112.8 98.8 Adjustments for prior y<span class=\"_ _2\"></span>ears<span class=\"_ _e\"></span> (0.7) (4.1) Total cu<span class=\"_ _2\"></span>rrent income tax expenses<span class=\"_ _e\"></span> 112.1 94.7 Origination from an<span class=\"_ _2\"></span>d reversal of temporary differences<span class=\"_ _e\"></span> 35.4 10.5 Total deferred t<span class=\"_ _2\"></span>axes expenses<span class=\"_ _e\"></span> 35.4 10.5 Total in<span class=\"_ _2\"></span>come taxes and deferred taxes recognised in profit and loss<span class=\"_ _e\"></span> 147.5 105.2 Total income t<span class=\"_ _2\"></span>ax expenses 2022 were higher than in 2021. The i<span class=\"_ _e\"></span>ncrease is mainly explained by the higher profit generated both in Belgium and<span class=\"_ _2\"></span> Germany.<span class=\"_ _e\"></span> Deferred income taxe<span class=\"_ _2\"></span>s are discussed further in Note <span class=\"ls5b\">6.<span class=\"_ _e\"></span></span>7. RECONCILI<span class=\"_ _e\"></span>A<span class=\"_ _2\"></span>TION OF THE EFFECTIVE TAX RATE The ta<span class=\"_ _2\"></span>x on the Group's profit (loss) before tax differs from <span class=\"_ _e\"></span>the theoretical amount that would arise using the Belgian statutory tax rate applicable to profits (lo<span class=\"_ _2\"></span>sses) of the consolidated companies:<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Profit before income t<span class=\"_ _2\"></span>ax 555.7 433.5 Domestic corpor<span class=\"_ _2\"></span>ate income tax 25%<span class=\"ls0\"> </span>25%<span class=\"ls0\"> </span>Income <span class=\"_ _2\"></span>tax, using the domestic corporate tax rate<span class=\"_ _e\"></span> (138.9) (108.4) Effect of th<span class=\"_ _2\"></span>e foreign tax rate (17.5) (11.6) Share of profit<span class=\"_ _2\"></span> of equity accounted investees, net of tax<span class=\"_ _e\"></span> 10.0 12.3 Non-deductible e<span class=\"_ _2\"></span>xpenses (11.0) (10.6) Adjustments for prior y<span class=\"_ _2\"></span>ears<span class=\"_ _e\"></span> 0.8 4.4 Tax credits an<span class=\"_ _2\"></span>d other tax reductions<span class=\"_ _e\"></span> 7.3 5.6 Effect of unrecognized deferred<span class=\"_ _2\"></span> tax assets on tax loss carry-forwards<span class=\"_ _e\"></span> (4.6) (1.9) Tax on<span class=\"_ _2\"></span> hybrid securities 4.8 4.8 Corporate interest restr<span class=\"_ _2\"></span>iction<span class=\"_ _e\"></span> 0.0 0.0 Other 1.6 0.1 Total in<span class=\"_ _2\"></span>come taxes and deferr<span class=\"_ _e\"></span>ed taxes recognised in profit<span class=\"_ _2\"></span> and loss<span class=\"_ _e\"></span> (147.5) (105.2) * The income tax rate<span class=\"_ _2\"></span> in Germany amounts to 29.93% in 2022 and 29.72% in 2021<span class=\"_ _e\"></span> The e<span class=\"_ _2\"></span>ffective tax rate 2022 of the Group is 26.54%, compared to 24.27% in 2021. This increase is mainly <span class=\"_ _e\"></span>explained by<span class=\"fs11 fc1e\"> <span class=\"_ _e\"></span></span>the high<span class=\"_ _2\"></span>er contribu<span class=\"_ _2\"></span>tion of the German segment to the profit befo<span class=\"_ _e\"></span>re tax at an h<span class=\"_ _2\"></span>igher local tax rate.6.7. <span class=\"_ _87\"> </span>Deferred tax assets and liabilities RECOGNISED DEFERRED TAX ASSETS AND LIA<span class=\"_ _2\"></span>BILITIES<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Assets Liability Assets Liability 25.1 (258.6) 25.2 (245.8) Property, plant <span class=\"_ _2\"></span>and equipment<span class=\"_ _e\"></span> (15.8) (15.4) Intangib<span class=\"_ _2\"></span>le assets<span class=\"_ _e\"></span> 7.4 (62.5) (105.7) Financial a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 1.2 (0.0) 1.3 (0.0) Non-current <span class=\"_ _2\"></span>trade and other receivables<span class=\"_ _e\"></span> 33.9 (5.5) 41.8 (5.6) Intere<span class=\"_ _2\"></span>st-bearing loans and other non-curre<span class=\"_ _e\"></span>nt financial liabilities 19.2 (10.8) 26.7 (11.8) Employee b<span class=\"_ _2\"></span>enefits<span class=\"_ _e\"></span> 36.3 30.2 Provisions 28.2 (1.1) 25.9 (1.5) Deferred re<span class=\"_ _2\"></span>venue 79.4 (76.3) 22.3 Regulator<span class=\"_ _2\"></span>y liabilities<span class=\"_ _e\"></span> (25.3) (1.0) Deferred tax <span class=\"_ _2\"></span>on investment grants<span class=\"_ _e\"></span> 12.6 14.0 Losses carried forward 0.3 (9.5) 0.7 (8.9) Other items 243.6 (465.4) 188.1 (395.8) Tax asset<span class=\"_ _2\"></span>/liability before offsetting<span class=\"_ _e\"></span> (241.8) 241.8 (186.2) 186.2 Offsetting of tax Net tax<span class=\"_ _2\"></span> asset/(liability) 1.<span class=\"ls0\">8 </span>(223.6) 1.9 (209.6) The change<span class=\"_ _2\"></span>s in deferred tax assets and liabilities can be <span class=\"_ _e\"></span>presented as <span class=\"_ _2\"></span>follows:<span class=\"_ _e\"></span> CHANGES IN DEFERRED TAX ASSETS AND LIA<span class=\"_ _2\"></span>BILITIES R<span class=\"_ _e\"></span>ESULTING FROM<span class=\"_ _2\"></span> MOVEMENTS IN TEMPORARY DIFFERENCES DURING THE FINANCIAL YEAR (in \u20ac million)<span class=\"ff40\"> </span>Recognised Recognised in<span class=\"_ _2\"></span> Net tax<span class=\"_ _2\"></span> in income comprehensiv<span class=\"_ _2\"></span>e Oth<span class=\"ls5b\">er</span> Total asset<span class=\"_ _2\"></span>/(liability)<span class=\"_ _e\"></span> state<span class=\"_ _2\"></span>ment<span class=\"_ _e\"></span> income 2021<span class=\"ls0\"> </span>(210.6) (10.4) 0<span class=\"fs8\"> </span>0<span class=\"fs8\"> </span>(221.0) Property, plant <span class=\"_ _2\"></span>and equipment<span class=\"_ _e\"></span> (6.3) (9.1) 0<span class=\"fs8\"> </span>0<span class=\"fs8\"> </span>(15.4) Intangib<span class=\"_ _2\"></span>le assets<span class=\"_ _e\"></span> (105.7) 0<span class=\"fs8\"> </span>(105.7) Financial a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 0.8 0.3 0<span class=\"fs8\"> </span>0<span class=\"fs8\"> </span>1.1 Non-current <span class=\"_ _2\"></span>trade and other receivables<span class=\"_ _e\"></span> Intere<span class=\"_ _2\"></span>st-bearing loans and other non-curre<span class=\"_ _e\"></span>nt financial 27.6 18.9 (0.2) 46.3 liabilities 19.0 2.9 (7.0) 0<span class=\"fs8\"> </span>14.9 Employee b<span class=\"_ _2\"></span>enefits<span class=\"_ _e\"></span> 46.8 (2.2) 0<span class=\"fs8\"> </span>0<span class=\"fs8\"> </span>44.6 Provisions 22.5 (7.8) 0<span class=\"fs8\"> </span>14.6 Deferred re<span class=\"_ _2\"></span>venue 22.6 (0.4) 0<span class=\"fs8\"> </span>0<span class=\"fs8\"> </span>22.2 Regulator<span class=\"_ _2\"></span>y liabilities<span class=\"_ _e\"></span> (1.1) 0<span class=\"fs8\"> </span>0.1 0<span class=\"fs8\"> </span>(1.0) Deferred tax <span class=\"_ _2\"></span>on investment grants<span class=\"_ _e\"></span> 0.8 0.2 0<span class=\"fs8\"> </span>0<span class=\"fs8\"> </span>1.0 Losses carried forward (6.5) (2.8) 0<span class=\"fs8\"> </span>(9.3) Other items Total (84.5) (10.5) (112.8) 0<span class=\"ff40 fs8 fc1c\"> </span>(207.8) 2022<span class=\"ls0\"> </span>(221.0) (13.8) 0 0 (234.8) Property, plant <span class=\"_ _2\"></span>and equipment<span class=\"_ _e\"></span> (15.4) (0.4) 0 0 (15.8) Intangib<span class=\"_ _2\"></span>le assets<span class=\"_ _e\"></span> (105.7) 0 50.6 0 (55.1) Financial a<span class=\"_ _2\"></span>ssets<span class=\"_ _e\"></span> 1.1 (0.0) 0 0 1.1 Non-current <span class=\"_ _2\"></span>trade and other receivables<span class=\"_ _e\"></span> Intere<span class=\"_ _2\"></span>st-bearing loans and other non-curre<span class=\"_ _e\"></span>nt financial 46.3 (6.9) (0.1) 0 39.3 liabilities 14.9 (1.6) (4.9) 0 8.5 Employee b<span class=\"_ _2\"></span>enefits<span class=\"_ _e\"></span> 44.6 6.1 0 0 50.7 Provisions 14.6 2.6 0 0 17.2 Deferred re<span class=\"_ _2\"></span>venue 22.2 (19.1) 0 0 3.0 Regulator<span class=\"_ _2\"></span>y liabilities<span class=\"_ _e\"></span> (1.0) (0.0) 0 0 (0.1) Deferred tax <span class=\"_ _2\"></span>on investment grants<span class=\"_ _e\"></span> 1.0 0.0 0 0 1.0 Losses carried forward (9.3) (2.4) 0 0 (11.7) Other items Total (207.8) (35.4)<span class=\"ff40 fc1c\"> </span>45.6<span class=\"ff40 fc1c\"> </span>0<span class=\"ff40 fc1c\"> </span>(196.6) The d<span class=\"_ _2\"></span>eferred tax <span class=\"_ _4b\"></span>lia<span class=\"_ _e\"></span>bility on<span class=\"_ _2\"></span> right-<span class=\"ls5b\">of</span>-<span class=\"ff42\">use assets <span class=\"_ _2\"></span>from IFRS 16 <span class=\"_ _4b\"></span>l<span class=\"_ _e\"></span>eases is <span class=\"_ _2\"></span>shown <span class=\"_ _2\"></span>under \u2018Property, <span class=\"_ _2\"></span>plant <span class=\"_ _2\"></span>and equipment\u2019, whilst <span class=\"_ _4b\"></span>the<span class=\"_ _e\"></span> d<span class=\"_ _2\"></span>eferred </span>tax asset on finance lea<span class=\"_ _2\"></span>se liability is shown under \u2019Interest<span class=\"_ _e\"></span><span class=\"ff3f\">-bearing loans and other non-current </span>financial liabilities\u2019.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>UNRECOGNISED DEFERRED TAX ASSETS OR LIABILITIES As at 31 December<span class=\"_ _2\"></span> 2022, the group had unrecognised deferred tax asset<span class=\"ff42\">s for a total of \u20ac</span><span class=\"ls5b\">26</span>.9 <span class=\"_ _e\"></span>million. This amount can be summarized follows: (in \u20ac million)<span class=\"ff40\"> </span>Gross Deferred ta<span class=\"_ _2\"></span>x Tax losses 7.0 1.7 Realto 1.2 0.3 EGI (including<span class=\"_ _2\"></span> branches)<span class=\"_ _e\"></span> 3.0 0.7 Windgrid 2.8 0.7 Dividend rece<span class=\"_ _2\"></span>ived deduction<span class=\"_ _e\"></span> 27<span class=\"ls0\">.1 </span>6.8 Elia Group 21<span class=\"ls0\">.8 </span>5.5 Eurogrid <span class=\"_ _2\"></span>International (BE)<span class=\"_ _e\"></span> 3.0 0.8 EGI 2.3 0.6 Exceeding borrowing cost<span class=\"_ _2\"></span>s 73<span class=\"ls0\">.6 </span>18<span class=\"ls0\">.4 </span>Elia Group 73<span class=\"ls0\">.6 </span>18<span class=\"ls0\">.4 </span>Total<span class=\"fc3\"> </span>107<span class=\"ls0\">.7 </span>26<span class=\"ls0\">.9 </span>These unused tax lo<span class=\"_ _2\"></span>sses carried forward, Di<span class=\"_ _e\"></span>vidend Received Deduction carried forward and non-deductible interests carried forward (Corporate Interest Restr<span class=\"_ _2\"></span>iction rule) have no expiry date. A<span class=\"_ _e\"></span>n assessme<span class=\"_ _2\"></span>nt is conducted <span class=\"_ _e\"></span>each year to determine the probability that <span class=\"_ _2\"></span>these fiscal deduct<span class=\"_ _2\"></span>ions could be used in the future to lower the t<span class=\"_ _e\"></span>ax base.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDeferredTaxesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__47": {
   "value": "5.4. <span class=\"_ _87\"> </span>Income taxes RECOGNISED IN PROFIT OR LOSS The consolidated income sta<span class=\"_ _2\"></span>tement includes the following taxes:<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Curren<span class=\"_ _2\"></span>t year 112.8 98.8 Adjustments for prior y<span class=\"_ _2\"></span>ears<span class=\"_ _e\"></span> (0.7) (4.1) Total cu<span class=\"_ _2\"></span>rrent income tax expenses<span class=\"_ _e\"></span> 112.1 94.7 Origination from an<span class=\"_ _2\"></span>d reversal of temporary differences<span class=\"_ _e\"></span> 35.4 10.5 Total deferred t<span class=\"_ _2\"></span>axes expenses<span class=\"_ _e\"></span> 35.4 10.5 Total in<span class=\"_ _2\"></span>come taxes and deferred taxes recognised in profit and loss<span class=\"_ _e\"></span> 147.5 105.2 Total income t<span class=\"_ _2\"></span>ax expenses 2022 were higher than in 2021. The i<span class=\"_ _e\"></span>ncrease is mainly explained by the higher profit generated both in Belgium and<span class=\"_ _2\"></span> Germany.<span class=\"_ _e\"></span> Deferred income taxe<span class=\"_ _2\"></span>s are discussed further in Note <span class=\"ls5b\">6.<span class=\"_ _e\"></span></span>7. RECONCILI<span class=\"_ _e\"></span>A<span class=\"_ _2\"></span>TION OF THE EFFECTIVE TAX RATE The ta<span class=\"_ _2\"></span>x on the Group's profit (loss) before tax differs from <span class=\"_ _e\"></span>the theoretical amount that would arise using the Belgian statutory tax rate applicable to profits (lo<span class=\"_ _2\"></span>sses) of the consolidated companies:<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Profit before income t<span class=\"_ _2\"></span>ax 555.7 433.5 Domestic corpor<span class=\"_ _2\"></span>ate income tax 25%<span class=\"ls0\"> </span>25%<span class=\"ls0\"> </span>Income <span class=\"_ _2\"></span>tax, using the domestic corporate tax rate<span class=\"_ _e\"></span> (138.9) (108.4) Effect of th<span class=\"_ _2\"></span>e foreign tax rate (17.5) (11.6) Share of profit<span class=\"_ _2\"></span> of equity accounted investees, net of tax<span class=\"_ _e\"></span> 10.0 12.3 Non-deductible e<span class=\"_ _2\"></span>xpenses (11.0) (10.6) Adjustments for prior y<span class=\"_ _2\"></span>ears<span class=\"_ _e\"></span> 0.8 4.4 Tax credits an<span class=\"_ _2\"></span>d other tax reductions<span class=\"_ _e\"></span> 7.3 5.6 Effect of unrecognized deferred<span class=\"_ _2\"></span> tax assets on tax loss carry-forwards<span class=\"_ _e\"></span> (4.6) (1.9) Tax on<span class=\"_ _2\"></span> hybrid securities 4.8 4.8 Corporate interest restr<span class=\"_ _2\"></span>iction<span class=\"_ _e\"></span> 0.0 0.0 Other 1.6 0.1 Total in<span class=\"_ _2\"></span>come taxes and deferr<span class=\"_ _e\"></span>ed taxes recognised in profit<span class=\"_ _2\"></span> and loss<span class=\"_ _e\"></span> (147.5) (105.2) * The income tax rate<span class=\"_ _2\"></span> in Germany amounts to 29.93% in 2022 and 29.72% in 2021<span class=\"_ _e\"></span> The e<span class=\"_ _2\"></span>ffective tax rate 2022 of the Group is 26.54%, compared to 24.27% in 2021. This increase is mainly <span class=\"_ _e\"></span>explained by<span class=\"fs11 fc1e\"> <span class=\"_ _e\"></span></span>the high<span class=\"_ _2\"></span>er contribu<span class=\"_ _2\"></span>tion of the German segment to the profit befo<span class=\"_ _e\"></span>re tax at an h<span class=\"_ _2\"></span>igher local tax rate.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__49": {
   "value": "5.5. <span class=\"_ _87\"> </span>Earnings per share (EPS) BASIC <span class=\"_ _e\"></span>EPS Basic earning<span class=\"_ _2\"></span>s per share are calculated by dividing the net profit attributable to the <span class=\"_ _e\"></span><span class=\"ff42\">Company\u2019s </span>shareholders (after <span class=\"_ _e\"></span>adjustment for the<span class=\"_ _2\"></span> distribution on h<span class=\"_ _2\"></span>ybrid securities<span class=\"ls57\">) <span class=\"ff42 ls8f\">(\u20ac</span></span>341.7 million) by the weighted average number of ordinary shares outstanding during the year.<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Profit att<span class=\"_ _2\"></span>ributable to equity holders of ordinary shares<span class=\"_ _e\"></span> 341.7 276.0 Effect of dilutive<span class=\"_ _2\"></span> potential ordinary shares<span class=\"_ _e\"></span> 0 0 Earnings for the purpo<span class=\"_ _2\"></span>ses of diluted earnings per share<span class=\"_ _e\"></span> 341.7 276<span class=\"ls0\"> </span>Ordinar<span class=\"_ _2\"></span>y shares issued on 1 January<span class=\"_ _e\"></span> 68,728<span class=\"_ _2\"></span>,055 68,720<span class=\"_ _2\"></span>,695<span class=\"_ _e\"></span> Treasury shares a<span class=\"_ _2\"></span>s at 1 January<span class=\"_ _e\"></span> -7,248 0 Ordinar<span class=\"_ _2\"></span>y shares issued in March 2021<span class=\"_ _e\"></span> 7,360 Ordinar<span class=\"_ _2\"></span>y shares issued in June 2022 4,739,864 Ordinar<span class=\"_ _2\"></span>y shares issued in December 2022<span class=\"_ _e\"></span> 47,920 Treasury shares - net movement for the year -6,232 -7,248 Outstanding ord<span class=\"_ _2\"></span>inary shares as at 31 December<span class=\"_ _e\"></span> 73,502<span class=\"_ _2\"></span>,359 68,720<span class=\"_ _2\"></span>,807<span class=\"_ _e\"></span> Weighted average<span class=\"_ _2\"></span> of outstanding ordinary shares (basic)<span class=\"_ _e\"></span> 71,142<span class=\"_ _2\"></span>,846 68,722<span class=\"_ _2\"></span>,476<span class=\"_ _e\"></span> Effect of dilutive<span class=\"_ _2\"></span> potential ordinary shares<span class=\"_ _e\"></span> 0 0 Weighted average<span class=\"_ _2\"></span> number of <span class=\"_ _e\"></span>outstanding o<span class=\"_ _2\"></span>rdinary sh<span class=\"_ _e\"></span>ares (diluted) 71,142<span class=\"_ _2\"></span>,846 68,722<span class=\"_ _2\"></span>,476<span class=\"_ _e\"></span> Basic ea<span class=\"_ _2\"></span>rnings per share (in \u20ac)<span class=\"ff40\"> </span>4.80 4.02 Diluted earn<span class=\"_ _2\"></span>ings per share (in \u20ac)<span class=\"ff40\"> </span>4.80 4.02 DILUTED EPS Diluted earnings <span class=\"_ _2\"></span>per share are determined by adjusting the profit or loss attributable to ordinary shareholders and t<span class=\"_ _e\"></span>he weighted average number of ordinary shares outstan<span class=\"_ _2\"></span>ding for the effects of all dilutive potential ordinary shares, which comprise share options<span class=\"_ _e\"></span> and convertib<span class=\"_ _2\"></span>le bonds.<span class=\"_ _e\"></span> Diluted earnings <span class=\"_ _2\"></span>per share are equal to basic e<span class=\"_ _e\"></span>arnings per share, since there<span class=\"_ _2\"></span> are no share options or convertible b<span class=\"_ _e\"></span>onds.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEarningsPerShareExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__50": {
   "value": "5.6. <span class=\"_ _87\"> </span>Other co<span class=\"_ _e\"></span>mprehensive income Total comprehensive<span class=\"_ _2\"></span> income includes both the result of the period recognised in the statement of profit or loss and other compr<span class=\"_ _e\"></span>ehensive income recogn<span class=\"_ _2\"></span>ised in equity. <span class=\"ff42\">\u2018</span>Other comprehensive inco<span class=\"_ _e\"></span>me<span class=\"ff42\">\u2019</span> includes all changes in equity other than owner-relate<span class=\"_ _e\"></span>d changes, which are repor<span class=\"_ _2\"></span>ted in the statement of changes in equity.<span class=\"_ _e\"></span> The total other comprehensive income for 2022 amounts <span class=\"_ _e\"></span>to <span class=\"ff42\">\u20ac</span>65.6 million ne<span class=\"_ _e\"></span>gative impact, representing a significan<span class=\"_ _e\"></span>t <span class=\"ls5b\">de</span>cr<span class=\"_ _e\"></span>ease compared with the previ<span class=\"ff42\">ous <span class=\"_ _2\"></span>year (\u20ac<span class=\"ff3f\">270.8 million <span class=\"_ _e\"></span>positive impact). The most important drivers of this are described below. </span></span>Cash flow he<span class=\"_ _2\"></span>dges<span class=\"_ _e\"></span> Since 2021, 50Her<span class=\"_ _2\"></span>tz applies hedge accounting for the purpose of reducing the risk of fluctuations in the expected a<span class=\"_ _e\"></span>mount of grid losses. Due to the dr<span class=\"_ _2\"></span>op in energy prices in the last quarter of the year, the fair value of these contracts decreased from \u20ac355<span class=\"_ _e\"></span><span class=\"ff3f\">.6 million in 2021 to </span>\u20ac129.6<span class=\"_ _2\"></span> million end of 2022, or a decrease of \u20ac226 million (pre<span class=\"ff3f\">-tax). <span class=\"_ _e\"></span>This impact has been partly offset by the positive value a<span class=\"_ _2\"></span>ccounted </span>for in Belgium in co<span class=\"_ _2\"></span>nnection with the pre<span class=\"_ _e\"></span>-hedging of probable forecast debt transactions (bonds issuance). The fair value of these derivatives amounted<span class=\"_ _2\"></span> to \u20ac65.3 million<span class=\"ff3f\"> (pr<span class=\"_ _e\"></span>e-tax). </span>The related<span class=\"_ _2\"></span> tax on these elements amounts to +<span class=\"_ _e\"></span><span class=\"ff42\">\u20ac</span><span class=\"ls5b\">50</span>.4 million. Financial a<span class=\"_ _2\"></span>ssets measured at fair value through other comprehensive income<span class=\"_ _e\"></span> The measureme<span class=\"_ _2\"></span>nt at fair value of the pa<span class=\"_ _e\"></span>rticipation of EEX, in which 50<span class=\"_ _2\"></span>Hertz Transmission holds a 5.4%<span class=\"_ _e\"></span> stake <span class=\"ff42\">resulted in a gain of \u20ac3</span>2,7 million as of 31 December 2022. <span class=\"ff42\">The fair value e<span class=\"_ _2\"></span>volved fr<span class=\"_ _e\"></span>om \u20ac42,7 million end of 2021 to \u20ac75.9<span class=\"_ _2\"></span> million end of 2022.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>Re<span class=\"_ _e\"></span>me<span class=\"_ _e\"></span>a<span class=\"_ _e\"></span>su<span class=\"_ _e\"></span>re<span class=\"_ _e\"></span>me<span class=\"_ _e\"></span>n<span class=\"_ _e\"></span>ts<span class=\"_ _20\"></span> of<span class=\"_ _e\"></span> p<span class=\"_ _e\"></span>o<span class=\"_ _e\"></span>st-<span class=\"_ _e\"></span>e<span class=\"_ _e\"></span>mp<span class=\"_ _e\"></span>lo<span class=\"_ _e\"></span>y<span class=\"_ _e\"></span>me<span class=\"_ _e\"></span>nt<span class=\"_ _e\"></span> <span class=\"_ _e\"></span>be<span class=\"_ _e\"></span>ne<span class=\"_ _e\"></span>fi<span class=\"_ _e\"></span>t <span class=\"_ _e\"></span>o<span class=\"_ _e\"></span>bli<span class=\"_ _e\"></span>g<span class=\"_ _e\"></span>at<span class=\"_ _e\"></span>i<span class=\"_ _e\"></span>ons<span class=\"_ _20\"></span><span class=\"ff40\"> </span>The o<span class=\"_ _2\"></span>ther comprehensive income on post-<span class=\"_ _e\"></span>employment obligations had a positive impact amounting to <span class=\"ff42\">\u20ac</span><span class=\"ls5b\">16</span>.3 <span class=\"_ _e\"></span>million. This impact is mainly expla<span class=\"_ _2\"></span>ined by the increase <span class=\"lsa7\">in</span> <span class=\"_ _2\"></span>the discount rate, partly offset by the negative return of the plan assets. See No<span class=\"_ _e\"></span>te 6<span class=\"ls1d\">.1</span>3 for more details.  The related<span class=\"_ _2\"></span> tax on these elements amounts to -<span class=\"ff42\">\u20ac</span>4.9 <span class=\"_ _e\"></span>million.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAnalysisOfOtherComprehensiveIncomeByItemExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__51-1": {
   "value": "Cash flow he<span class=\"_ _2\"></span>dges<span class=\"_ _e\"></span> Since 2021, 50Her<span class=\"_ _2\"></span>tz applies hedge accounting for the purpose of reducing the risk of fluctuations in the expected a<span class=\"_ _e\"></span>mount of grid losses. Due to the dr<span class=\"_ _2\"></span>op in energy prices in the last quarter of the year, the fair value of these contracts decreased from \u20ac355<span class=\"_ _e\"></span><span class=\"ff3f\">.6 million in 2021 to </span>\u20ac129.6<span class=\"_ _2\"></span> million end of 2022, or a decrease of \u20ac226 million (pre<span class=\"ff3f\">-tax). <span class=\"_ _e\"></span>This impact has been partly offset by the positive value a<span class=\"_ _2\"></span>ccounted </span>for in Belgium in co<span class=\"_ _2\"></span>nnection with the pre<span class=\"_ _e\"></span>-hedging of probable forecast debt transactions (bonds issuance). The fair value of these derivatives amounted<span class=\"_ _2\"></span> to \u20ac65.3 million<span class=\"ff3f\"> (pr<span class=\"_ _e\"></span>e-tax). </span>The related<span class=\"_ _2\"></span> tax on these elements amounts to +<span class=\"_ _e\"></span><span class=\"ff42\">\u20ac</span><span class=\"ls5b\">50</span>.4 million.Financial a<span class=\"_ _2\"></span>ssets measured at fair value through other comprehensive income<span class=\"_ _e\"></span> The measureme<span class=\"_ _2\"></span>nt at fair value of the pa<span class=\"_ _e\"></span>rticipation of EEX, in which 50<span class=\"_ _2\"></span>Hertz Transmission holds a 5.4%<span class=\"_ _e\"></span> stake <span class=\"ff42\">resulted in a gain of \u20ac3</span>2,7 million as of 31 December 2022. <span class=\"ff42\">The fair value e<span class=\"_ _2\"></span>volved fr<span class=\"_ _e\"></span>om \u20ac42,7 million end of 2021 to \u20ac75.9<span class=\"_ _2\"></span> million end of 2022.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>6.18. <span class=\"_ _92\"> </span>Fin<span class=\"_ _e\"></span>ancial instruments <span class=\"ff43\">\u2013</span> fair values The fo<span class=\"_ _2\"></span>llowing table shows the carrying amounts and fair values of financial assets and liabilities, including their levels in<span class=\"_ _e\"></span> the fair value hierar<span class=\"_ _2\"></span>chy<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> Carrying amount Fair value (in \u20ac million)<span class=\"ff40\"> </span>Balance at 31 December<span class=\"_ _2\"></span> 2021<span class=\"ls0\"> </span>Other financial assets 7.0  399.4  46.2  452.5  362.6  43.8  406.4  Equity instruments at fair value through other comprehensive income 43.8  43.8  43.8  43.8  Equity instruments at fair value through income 7.0  7.0  7.0  7.0  Derivatives 355.6  355.6  355.6  355.6  Regulatory assets 46.2  46.2  Trade and other receivables  (Current and Non-current) 861.8  861.8  Cash and cash equivalents 3,049.5  3,049.5  Loans and borrowings (Current and Non-Current) 0.0  0.0  0.0  (7,935.7) (7,935.7) (7,968.8) (247.8) (8,216.6) Unsecured bond issues (7,248.5) (7,248.5) (7,476.8) (247.8) (7,724.6) Unsecured financial bank loans and other loans (492.0) (492.0) (492.0) (492.0) Lease liabilities (118.8) (118.8) Accrued interests (76.4) (76.4) Trade and other payables (3,696.4) (3,696.4) Total 7.0 399.4 3,957.5 (11,632.0) (7,268.2) n.r. n.r. n.r. n.r. Balance at 31 December<span class=\"_ _2\"></span> 2022<span class=\"ls0\"> </span>Other financial assets 7.0  296.1  33.8  336.9  226.6  76.4  303.1  Equity instru<span class=\"_ _e\"></span>ments at fa<span class=\"_ _2\"></span>ir value through other comprehensive income 76.4  76.4  76.4  76.4  Equity instruments at fair value through income 7.0  7.0  7.0  7.0  Derivatives 219.7  219.7  219.7  219.7  Regulatory assets 33.8  33.8  Trade and other receivables (Current and Non-current) 1,367.1  1,367.1  Cash and cash equivalents 4,151.2  4,151.2  Loans and borrowings (Current and Non-Current) 0.0  0.0  0.0  (8,582.8) (8,582.8) (8,183.4) (172.9) (8,356.3) Unsecured bond issues (7,243.0) (7,243.0) (7,015.7) (172.9) (7,188.6) Unsecured financial bank loans and other loans (1,167.7) (1,167.7) (1,167.7) (1,167.7) Lease liabilities (90.2) (90.2) Accrued interests (81.9) (81.9) Other non-current liabilities  (24.7) (24.7) out of which, <span class=\"ff48\">Derivatives</span> (24.7) (24.7) (24.7) (24.7) Trade and other payables (4,804.2) (4,804.2) Total 7.0 2<span class=\"ls104\">71<span class=\"_ _e\"></span></span>.4 5,552.1 (13,387.0) (7,556.5) n.r. n.r. n.r. n.r. The above t<span class=\"_ _2\"></span>ables do not include fair value information for financial assets and liabilities not measured at fair value, such as cash and cash equ<span class=\"_ _2\"></span>ivalents, trade and other receivables, and trade and other payables, as their carrying amount is a reasona<span class=\"_ _e\"></span>ble approximation of fair value<span class=\"_ _2\"></span>. We consider that the carrying amount approxi<span class=\"_ _e\"></span>mates the fair value considering the financial and short-te<span class=\"_ _e\"></span>rm nature. FAIR VALUE HI<span class=\"_ _e\"></span>ERARCHY<span class=\"ff3f\"> </span>Fair va<span class=\"_ _2\"></span>lue is the amount for which an asset could be exchanged or a liability settled in an arm's-le<span class=\"_ _e\"></span>ngth transaction. IFRS 7 requires,<span class=\"_ _2\"></span> for financial instrume<span class=\"_ _2\"></span>nts that are measured in the s<span class=\"_ _e\"></span>tatement of financial position at fair value and for financial instruments measured at amortised cost for which<span class=\"_ _2\"></span> the fair value has been disclosed<span class=\"_ _e\"></span>, the disclosure of fair value measurements by level in the following fair value measurement hierarch<span class=\"_ _2\"></span>y: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 1: <span class=\"ff3f\">The fair value of a financial instrument that is traded in an active <span class=\"_ _e\"></span>market is measured based on quoted (unadjusted) </span></span></span>prices for iden<span class=\"_ _2\"></span>tical assets or liabilities. A market is considered active if quoted prices are readily and regularly availabl<span class=\"_ _e\"></span>e from an exchange, dea<span class=\"_ _2\"></span>ler, broker, industry group, pricing service or regulatory agency, and those prices represent actual a<span class=\"_ _e\"></span>nd regularly occurring market transa<span class=\"_ _2\"></span>ctions on an arm\u2019s<span class=\"ff3f\">-length basis.<span class=\"_ _e\"></span> </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 2: <span class=\"ff3f\">The fair value of financial instruments that are not traded in an active market is determined usin<span class=\"_ _e\"></span>g valuation techniques. </span></span></span>These maximise the use of observable market data where these are available and rely as little as possible on entity-specific estimates.<span class=\"_ _2\"></span> If all significant inputs required to assess the fair value of an instrument are observable, either directly (i.e.<span class=\"_ _e\"></span> as prices) or indirectly (<span class=\"_ _2\"></span>i.e. derived from prices), the instrument is included in level 2.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 3: <span class=\"ff3f\">If one or more of the significant inputs used in applying the valuation technique is not based on observable market data, </span></span></span>the finan<span class=\"_ _2\"></span>cial instrument is included in level 3. T<span class=\"ff42\">h<span class=\"_ _e\"></span>e fair value amount included under \u2018Other financial assets\u2019 ha<span class=\"_ _2\"></span>s been determined </span>by referring<span class=\"_ _2\"></span> to either: (i) recent transaction prices, known <span class=\"_ _e\"></span>by the group; for similar financial assets or (ii) valuation reports issued by third partie<span class=\"_ _2\"></span>s. The fa<span class=\"_ _2\"></span>ir value of financial assets and liabilities, other than those presented in the above table, approximates to their carrying amounts largely due to the sh<span class=\"_ _2\"></span>ort-term maturities of these instrume<span class=\"_ _e\"></span>nts. The fa<span class=\"_ _2\"></span>ir value of other financial assets decreased by \u20ac115.6 million compar<span class=\"_ _e\"></span><span class=\"ff3f\">ed to previous year. The decrease mainly results from the </span>fair value<span class=\"_ _2\"></span> of the future contracts entered into by 50Hertz for the purpose of reducing the risk of fluctuations in the expected amount of grid losses <span class=\"ff42\">(\u20ac154,4 m<span class=\"_ _2\"></span>illion end of 2022 compared to \u20ac355.6 m<span class=\"ff3f\">illion last year). This decrease is partly offset by the positive value </span></span>accounted for<span class=\"_ _2\"></span> in Belgium in connection with the pre-<span class=\"_ _e\"></span>hedging of probable forecast debt transa<span class=\"_ _2\"></span>ctions (bonds issuance). The fair value of these derivatives amounted<span class=\"_ _2\"></span> to \u20ac65.3 million. <span class=\"ff3f\">The </span>fair v<span class=\"_ _e\"></span>alue of the Sicav and the group\u2019s stake in EEX increased following rea<span class=\"_ _2\"></span>ssessment of the fair valu<span class=\"_ _2\"></span>e of EEX. Despite a lo<span class=\"_ _2\"></span>wer pricing on the market, the fair value of the bank loans and bond issues increased by \u20ac139.7 million, due to t<span class=\"_ _e\"></span><span class=\"ff3f\">he higher </span>nominal va<span class=\"_ _2\"></span>lue (additional Green Bond in Germany).<span class=\"_ _e\"></span> The fa<span class=\"_ _2\"></span>ir value of sicavs falls into level 1, i.e. valuation is b<span class=\"_ _e\"></span>ased on<span class=\"_ _2\"></span> the listed market price on an active market for identical instruments.<span class=\"_ _20\"></span> The derivative<span class=\"_ _2\"></span> from the price hedge for grid loss procu<span class=\"_ _e\"></span>rement, which is measured at fair value in OCI without affe<span class=\"_ _2\"></span>cting profit or loss, falls under<span class=\"_ _2\"></span> level 1 of the measurement hierarchy. Its value is determined on the basis of the reporting date valuation of the exist<span class=\"_ _e\"></span>ing futures contract<span class=\"_ _2\"></span>s, which are fully contracted via the EEX electricit<span class=\"_ _e\"></span>y exchange and quo<span class=\"_ _2\"></span>ted there. Credit and default risks are avoided with this form o<span class=\"_ _2\"></span>f price hedging via exchange transactions. A<span class=\"_ _e\"></span>t December 31, 2022, the Group reported derivative financia<span class=\"_ _2\"></span>l ins<span class=\"_ _e\"></span>truments in a net amoun<span class=\"_ _2\"></span>t of \u20ac129.6 million. The futures contracts were concluded during the fiscal year at prices between \u20ac61 and \u20ac295 per MWh. As a result of the vo<span class=\"_ _2\"></span>latile price development on the electricity market, a differentiated picture emerged on the balance sheet dat<span class=\"_ _e\"></span>e: Futures for 2023 were still con<span class=\"_ _2\"></span>tracted at advantageous hedging prices and show a positive market value (\u20ac 154.3 million) on the balance s<span class=\"_ _e\"></span><span class=\"ff3f\">heet </span>date, while<span class=\"_ _2\"></span> the futures positions already contracted for 2024 show a negative market value (\u20ac <span class=\"_ _e\"></span><span class=\"ff3f\">-24.7 million) as a result of the price </span>decline shortly be<span class=\"_ _2\"></span>fore the end of 2022. At the balance sheet date, the Group had already hedged a volume of 2.9 TWh for its ex<span class=\"_ _e\"></span>pected physical requirements for grid loss <span class=\"_ _2\"></span>energy in subsequent <span class=\"_ _e\"></span>years. The fa<span class=\"_ _2\"></span>ir value of the bonds is \u20ac7.<span class=\"ff3f ls5b\">036<span class=\"_ _e\"></span><span class=\"ls0\">.5 million (pr</span></span>ior year: <span class=\"_ _e\"></span>\u20ac7.<span class=\"ff3f ls5b\">724<span class=\"ls0\">,6 million). Fair value was determined by reference to published price </span></span>quotations in an active marke<span class=\"_ _2\"></span>t (classified as level 1 in the <span class=\"_ _e\"></span>fair value<span class=\"_ _2\"></span> hierarchy). The fair value of the registered bond is <span class=\"_ _e\"></span><span class=\"ff42\">\u20ac37.2 million</span> <span class=\"ls5b\">as</span> of 31 December 2022 and was determined by reference to third party information, <span class=\"_ _2\"></span>such as pricing services (classified as level 3 in the fair value<span class=\"_ _2\"></span> hierarchy). The fair value of the private placement amounts to <span class=\"ff42\">\u20ac</span>1<span class=\"ls5b\">33<span class=\"_ _e\"></span></span>.2 million (classified as level 3 in the fair value hierarchy).<span class=\"_ _e\"></span> The fa<span class=\"_ _2\"></span>ir value of other bank loans approximates to their carrying amounts largely due to the short-t<span class=\"_ _e\"></span>erm maturities of these instruments. Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFairValueOfFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__55-1": {
   "value": "6.1. <span class=\"_ _87\"> </span>Property, plant and equipment (in \u20ac million)<span class=\"ff40\"> </span>Leasing Machinery Furniture Other Assets Land and and and and tangible<span class=\"_ _2\"></span> under Total buildings similar equipment vehic<span class=\"_ _2\"></span>les<span class=\"_ _e\"></span> assets construct<span class=\"_ _2\"></span>ion rights ACQUISITION VALUE Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> 430.8 11,179<span class=\"_ _2\"></span>.4<span class=\"_ _e\"></span> 343.8 31.5 117.0 1,713.0 13,815<span class=\"_ _2\"></span>.6<span class=\"_ _e\"></span> Additions 10.6 179.8 36.0 0.9 49.6 956.0 1,232.8 Disposals (3.3) (87.1) (42.6) (0.2) (0.4) 0.0 (133.6) Transfers 27.6 503.0 35.1 2.9 0.0 (570.1) (1.5) Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021<span class=\"ls0\"> </span>465.8 11,775<span class=\"_ _2\"></span>.0<span class=\"_ _e\"></span> 372.3 35.1 166.1 2,098.8 14,913<span class=\"_ _2\"></span>.2<span class=\"_ _e\"></span> Balance at 1 Janua<span class=\"_ _2\"></span>ry 2022<span class=\"_ _e\"></span> 465.8 11,775<span class=\"_ _2\"></span>.0<span class=\"_ _e\"></span> 372.3 35.1 166.1 2,098.8 14,913<span class=\"_ _2\"></span>.2<span class=\"_ _e\"></span> Additions 9.3 334.0 34.7 0.1 (15.6) 1,130.1 1,492.6 Disposals (1.8) (82.6) (8.4) 0.0 0.5 (0.7) (93.0) Transfers 3.6 718.9 105.6 11.1 0.0 (838.0) 1.1 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022<span class=\"ls0\"> </span>476.8 12,745<span class=\"_ _2\"></span>.3<span class=\"_ _e\"></span> 504.2 46.4 151.0 2,390.1 16,313<span class=\"_ _2\"></span>.8<span class=\"_ _e\"></span> ACCUMULATED DEPRECIATION AND IMPAIRMENT Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> (36.1) (3,416.0) (205.7) (29.2) (34.2) 0.0 (3,721.2) Depreciation (6.6) (381.5) (39.7) (1.1) (14.8) (443.6) Disposals 2.2 68.6 39.7 0.1 0.4 111.<span class=\"ls0\">1 </span>Transfers 0.0 2.3 0.0 (2.3) 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021<span class=\"ls0\"> </span>(40.5) (3,726.6) (205.7) (32.4) (48.6) 0.0 (4,053.7) Balance at 1 Janua<span class=\"_ _2\"></span>ry 2022<span class=\"_ _e\"></span> (40.5) (3,726.6) (205.7) (32.4) (48.6) 0.0 (4,053.7) Depreciation (6.2) (404.1) (59.1) (0.6) (13.5) (483.6) Disposals 1.2 59.4 8.1 0.0 (0.5) 68.2 Transfers 0.0 11.0 0.0 (11.0) 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022<span class=\"ls0\"> </span>(45.5) (4,060.3) (256.7) (44.0) (62.5) 0.0 (4,469.1) CARRYING AMOUNT Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 394.7 7,763.4 138.1 2.3 82.8 1,713.1 10,094<span class=\"_ _2\"></span>.4<span class=\"_ _e\"></span> Balance at 31 December<span class=\"_ _2\"></span> 2021 425.3 8,048.4 166.6 2.8 117.5 2,098.9 10,859<span class=\"_ _2\"></span>.5<span class=\"_ _e\"></span> Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 425.3 8,048.4 166.6 2.8 117.5 2,098.9 10,859<span class=\"_ _2\"></span>.5<span class=\"_ _e\"></span> Balance at 31 December<span class=\"_ _2\"></span> 2022 431.4 8,684.9 247.4 2.3 88.5 2,390.1 11,844<span class=\"_ _2\"></span>.7<span class=\"_ _e\"></span> Large-scale (onshore and o<span class=\"_ _2\"></span>ffshore) infrastructure projects<span class=\"_ _e\"></span> in both Belgium and Germany are underway. These<span class=\"_ _2\"></span> projects are focusing on<span class=\"_ _e\"></span> strengthening both<span class=\"_ _2\"></span> the Belgian and German grids, d<span class=\"_ _e\"></span>eveloping the necessary offshore infrastructures to allow the integration of increasing<span class=\"_ _2\"></span> amounts of renewable energy into the grid and the digitalization of the infrastructure. The acceleration of<span class=\"_ _e\"></span> the energy transition and the current in<span class=\"_ _2\"></span>flationary environment are driving the investments of the Group.<span class=\"_ _e\"></span> In Belgium, <span class=\"_ _2\"></span>Elia Transmissi<span class=\"ff42\">on made investments totalling <span class=\"_ _e\"></span>\u20ac403.2 million in property, p<span class=\"_ _2\"></span>lant and equipment. In 2022, <span class=\"_ _e\"></span>159 replacement </span>projects o<span class=\"_ _2\"></span>ccurred across the Belgian grid, amounting to a total investment of \u20ac113.4 million. Around \u20ac60 million was invested<span class=\"ff3f\"> in </span>suppor<span class=\"_ _2\"></span>ting the digitalisation of our infrastructure and the d<span class=\"_ _e\"></span>evelopment of new tools. The reinforcement <span class=\"_ _2\"></span>works betwe<span class=\"_ _e\"></span>en Avelgem and Avelin, which forms pa<span class=\"_ _2\"></span>rt of the 380 kV backbone between Mercator and France, had been successfully finalised by the end of th<span class=\"_ _e\"></span>e year. Construction wor<span class=\"ff42\">ks continued along the Massenhoven Van Eyck Corridor (\u20ac32.7 million) and the Mercato<span class=\"_ _2\"></span>r Bruegel <span class=\"_ _e\"></span>Corridor (\u20ac33.9 </span>million). An im<span class=\"_ _2\"></span>portant milestone was reached with the commissioning of a new 380 kV GIS substation, two 380 kV phase shifters a<span class=\"_ _e\"></span>nd a 380 kV compens<span class=\"ff42\">ator in Zand<span class=\"_ _2\"></span>vliet (\u20ac12.1 million). In Q3<span class=\"ff3f\">-20<span class=\"_ _e\"></span>22, work began in Rimi\u00e8re on the construction of a new 380 kV subst<span class=\"_ _2\"></span>ation and </span></span>the extension o<span class=\"_ _2\"></span>f the existing 220 kV substation (\u20ac11.9 mill<span class=\"_ _e\"></span>ion); th<span class=\"_ _2\"></span>is project aims to create the required hosting capacity fo<span class=\"_ _e\"></span><span class=\"ff3f\">r the new CRM </span>power p<span class=\"_ _2\"></span>lants in Les Awirs &amp; Seraing by 2025.<span class=\"_ _e\"></span> In Germany, 50Hertz<span class=\"_ _2\"></span> Transmission invested \u20ac<span class=\"ff3f\">1,0<span class=\"_ _e\"></span>89.3 million in proper<span class=\"_ _2\"></span>ty, plant and equipment. The most significant onshore investment </span>is <span class=\"ff42\">the DC line SuedOstLink <span class=\"_ _2\"></span>(\u20ac210.0 million). It plays an important role <span class=\"ff3f\">in connecting the growing (offshore) production in the north of </span></span>German<span class=\"_ _2\"></span>y with the consumption centres in the South. In or<span class=\"_ _e\"></span>der to reinforce the existin<span class=\"_ _2\"></span>g grid, the upgrading of high<span class=\"_ _e\"></span>-vol<span class=\"_ _e\"></span>tage pylons to boost opera<span class=\"_ _2\"></span>tional safety was accelerated in 2022 (\u20ac54.7<span class=\"ff3f\"> million<span class=\"_ _e\"></span>). Another important milestone was reached for the replacement of the old </span>Uckermar<span class=\"_ _2\"></span>k line with the successful settlement of a lawsuit after 17 years. The investment for this reinforcement consists of <span class=\"_ _e\"></span>the overhead line in the<span class=\"_ _2\"></span> southern Uckermark region (\u20ac5<span class=\"ff3f\">3.1 <span class=\"_ _e\"></span></span>million) and the overhead line in the northern Uckermar<span class=\"_ _2\"></span>k region (\u20ac46.9<span class=\"_ _e\"></span><span class=\"ff3f\"> million). Other </span>important on<span class=\"_ _2\"></span>shore projects to strengthen our onshore grid<span class=\"_ _e\"></span> are the re<span class=\"_ _2\"></span>structuring of the substation Lauchst\u00e4dt with S<span class=\"_ _e\"></span>TATCOM and MSCDN (\u20ac35.0<span class=\"_ _2\"></span> million) and the restructu<span class=\"_ _e\"></span>ring and reinforcement of the<span class=\"_ _2\"></span> overhead line between Wolmirstedt and G\u00fcs<span class=\"_ _e\"></span>trow (\u20ac34.6 million). Offshore investments mainly fo<span class=\"_ _2\"></span>cused on the Ostwind 2 project (\u20ac186.3 million), with the next offshore wind farm connection (O<span class=\"ff3f\">stwind <span class=\"_ _e\"></span>3) </span>already advan<span class=\"_ _2\"></span>cing along the <span class=\"ff42\">project pipeline (\u20ac82.5 million).<span class=\"_ _e\"></span></span> During 2022, \u20ac24.2<span class=\"_ _2\"></span> million of borrowing costs were capitalised on assets under construction. An amount of \u20ac6.1 million based <span class=\"_ _e\"></span><span class=\"ff3f\">on an </span>average interest rate o<span class=\"_ _2\"></span>f 1.91% originated <span class=\"ff42\">from th<span class=\"_ _e\"></span>e Elia Transmission Belg<span class=\"_ _2\"></span>ium segment (\u20ac7.8 <span class=\"_ _e\"></span><span class=\"ff3f\">million at 2.03% in 2021). An amount of </span></span>\u20ac18.1 million ba<span class=\"_ _2\"></span>sed on an average interest rate of 1.44% was accounted for in the 50Hertz Transmission segment (\u20ac13.5 million<span class=\"_ _e\"></span><span class=\"ff3f\"> at </span>0.98% in 2021). There were<span class=\"_ _2\"></span> no mortgages, pledges or similar securities on PP&amp;<span class=\"_ _e\"></span>E relating to loans. Outstand<span class=\"_ _2\"></span>ing capital expenditure commitments are describ<span class=\"_ _e\"></span>ed in Note 8.2. The analysis of lease liabilities is presented in note 6.19.<span class=\"_ _e\"></span> Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.13. <span class=\"_ _92\"> </span>Int<span class=\"_ _e\"></span>erest-bearing loans, borrowings and lease liabilities (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Non-current borrowings 7,638.6 7,658.2 Lease liab<span class=\"_ _2\"></span>ilities \u2212<span class=\"ff3f\"> non-current </span>77.0 83.7 Subtotal non-cu<span class=\"_ _2\"></span>rrent borr<span class=\"_ _e\"></span>owings 7,715.6 7,741.7 Curren<span class=\"_ _2\"></span>t borrowings<span class=\"_ _e\"></span> 772.0 82.3 Lease liab<span class=\"_ _2\"></span>ilities \u2212 current<span class=\"ff3f\"> </span>13.2 35.1 Accrued interest 81.9 76.4 Subtotal current loan<span class=\"_ _2\"></span>s and borr<span class=\"_ _e\"></span>owings 867.2 194.0 Total 8,582.8 7,935.7 The tables be<span class=\"_ _2\"></span>low show the changes in the g<span class=\"_ _e\"></span>roup's liabilities arising from financing activities, in<span class=\"_ _2\"></span>cluding changes arising from <span class=\"_ _e\"></span>both cash flows and non-cash changes. Non-current interest-Current interest-bearing loans (in \u20ac million)<span class=\"ff40\"> </span>bearing loans and<span class=\"_ _2\"></span> Total and borrowings borrowings Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 805.5 7,249.6 8,055.1 Cash flow: r<span class=\"_ _2\"></span>epayment of borrowings<span class=\"_ _e\"></span> (722.3) (15.4) (737.7) Cash flow: procee<span class=\"_ _2\"></span>ds from withdrawal borrowings<span class=\"_ _e\"></span> 60.0 498.0 558.0 Accrued interest 5.4 0.0 5.4 Other 45.4 9.5 54.9 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 193.9 7,741.7 7,935.7 Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 193.9 7,741.7 7,935.7 Cash flow: r<span class=\"_ _2\"></span>epayment of borrowings<span class=\"_ _e\"></span> (82.3) (13.3) (95.8) Cash flow: procee<span class=\"_ _2\"></span>ds from withdrawal borrowings<span class=\"_ _e\"></span> 0.0 747.4 747.4 Accrued interest 5.5 0.2<span class=\"fs8\"> </span>5.7 Other 750.2 (760.4) (10.2) Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 867.2 7,715.6 8,582.8 During the year 2021, th<span class=\"_ _2\"></span>e group (Eu<span class=\"_ _e\"></span>rogrid GmbH) paid back <span class=\"ff42\">the revolving credit facilities (\u20ac700 million) that were temporarily contracted </span>to finance the EEG d<span class=\"_ _2\"></span>eficit at the end of 2020. Elia Group had issu<span class=\"ff42\">ed an Eurobond of \u20ac500.0 million with maturity date 2033 and an </span>interest rate<span class=\"_ _2\"></span> of 0.88%. The group also <span class=\"ff42\">iss<span class=\"_ _e\"></span>ued commercial papers for total amount of \u20ac60.0 m<span class=\"_ _2\"></span>illion with <span class=\"_ _e\"></span><span class=\"ff3f\">maturity date 2022 and an </span></span>interest rate <span class=\"ls5b\">of</span> -<span class=\"ff42\">0.15% under its commercial paper program of \u20ac</span>300.0 million.<span class=\"_ _e\"></span> In 2022, Eurogrid GmbH ha<span class=\"_ _2\"></span>s secured liquidity for the further grid expansion necessary for the energy transition with the issu<span class=\"_ _e\"></span>ance of a \u00e9<span class=\"ff42\">second Green Bond in<span class=\"_ _2\"></span> the amount of \u20ac750.0 million at a rate of 3.279% and a term of nine years. Repayment<span class=\"ff3f\">s<span class=\"_ _e\"></span> of borrowing 2022 </span></span>mainly re<span class=\"_ _2\"></span>late to the closing of the commercial paper program (-<span class=\"ff42\">\u20ac60.0 million) <span class=\"_ _e\"></span></span><span class=\"ls5b\">and </span>the capital repayment of the <span class=\"ff42\">amor<span class=\"_ _e\"></span>tizing loans (\u20ac22.0 </span>million). Movements in 'Other' during the financia<span class=\"_ _2\"></span>l year 2022 <span class=\"_ _e\"></span>mainly relates to reclassifications of long-term debt to short-term debt based on when instrumen<span class=\"_ _2\"></span>ts become due in 2023.<span class=\"_ _e\"></span> Information <span class=\"ls78\">on<span class=\"_ _4b\"></span><span class=\"ls0\"> the<span class=\"_ _e\"></span> terms and conditions of outstanding interest-bearing loans and borrowings is outlined below: </span></span>As per 31 De<span class=\"_ _2\"></span>cember 202<span class=\"ls5b\">2:<span class=\"_ _e\"></span></span> Redemption (in \u20ac million)<span class=\"ff40\"> </span>Matu<span class=\"_ _2\"></span>rity<span class=\"_ _e\"></span> Amount Interest rate schedule Eurobond issues 2013/15 years 2028<span class=\"ls0\"> </span>At maturity 548.0 3.25% Eurobond issues 2013/20 years 2033<span class=\"ls0\"> </span>At maturity 199.3 3.50% Eurobond issues 2014/15 years 2029<span class=\"ls0\"> </span>At maturity 347.6 3.00% Eurobond issues 2015/8.5 years 2024<span class=\"ls0\"> </span>At maturity 499.6 1.38% Eurobond issues 2017/10 years 2027<span class=\"ls0\"> </span>At maturity 248.5 1.38% Senior bo<span class=\"_ _2\"></span>nd 2018/10 years 2028<span class=\"ls0\"> </span>At maturity 298.3 1.50% Eurobond issues 2019/7 year<span class=\"_ _2\"></span>s 2026<span class=\"ls0\"> </span>At maturity 499.0 1.38% Eurobond issues 2020/10 years 2030<span class=\"ls0\"> </span>At maturity 790.9 0.88% Amortising term loan 2033<span class=\"ls0\"> </span>Linear 167.8 1.80% Amortising bond - 7,7 years 2028<span class=\"ls0\"> </span>Linear 50.3 1.56% Amortising bond - 23,7 years 2044<span class=\"ls0\"> </span>Linear 132.4 1.56% European Investment <span class=\"_ _2\"></span>Bank<span class=\"_ _e\"></span> 2025<span class=\"ls0\"> </span>At maturity 100.0 1.08% Commer<span class=\"_ _2\"></span>cial Paper<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>At maturity 0.0 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2025<span class=\"ls0\"> </span>At maturity 499.0 1.875% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2015 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2023<span class=\"ls0\"> </span>At maturity 749.7 1.625% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2015 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2030<span class=\"ls0\"> </span>At maturity 139.4 2.625% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2015 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2028<span class=\"ls0\"> </span>At maturity 748.0 1.500% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2016 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2032<span class=\"ls0\"> </span>At maturity 747.7 1.113% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2020 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2031<span class=\"ls0\"> </span>At maturity 747.4 3,279% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Programme 2021 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2040<span class=\"ls0\"> </span>At maturity 199.5 0,875% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Programme 2020 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2033<span class=\"ls0\"> </span>At maturity 498.3 0,741% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Programme 2021 Registered bond 2014 2044<span class=\"ls0\"> </span>At maturity 50.0 3,000% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Loan with KF<span class=\"_ _2\"></span>W<span class=\"_ _e\"></span> 2026<span class=\"ls0\"> </span>At maturity 150.0 0.90% Total 8,410.7 Lease debts 90.2 Accrued interests 81.9 Total Loan<span class=\"_ _2\"></span>s and Borrowings 8,582.8 (Current and Non-current) As per 31 De<span class=\"_ _2\"></span>cember 2021:<span class=\"_ _e\"></span> Redemption (in \u20ac million)<span class=\"ff40\"> </span>Matu<span class=\"_ _2\"></span>rity<span class=\"_ _e\"></span> Amount Interest rate schedule Eurobond issues 2013/15 years 2028<span class=\"ls0\"> </span>At maturity 547.7 3.25% Eurobond issues 2013/20 years 2033<span class=\"ls0\"> </span>At maturity 199.2 3.50% Eurobond issues 2014/15 years 2029<span class=\"ls0\"> </span>At maturity 347.2 3.00% Eurobond issues 2015/8.5 years 2024<span class=\"ls0\"> </span>At maturity 499.1 1.38% Eurobond issues 2017/10 years 2027<span class=\"ls0\"> </span>At maturity 248.2 1.38% Senior bo<span class=\"_ _2\"></span>nd 2018/10 years 2028<span class=\"ls0\"> </span>At maturity 297.9 1.50% Eurobond issues 2019/7 years 2026<span class=\"ls0\"> </span>At maturity 498.6 1.38% Eurobond issues 2020/10 years 2030<span class=\"ls0\"> </span>At maturity 789.7 0.88% Amortising term loan 2033<span class=\"ls0\"> </span>Linear 181.7 1.80% Amortising bond - 7,7 years 2028<span class=\"ls0\"> </span>Linear 58.7 1.56% Amortising bond - 23,7 years 2044<span class=\"ls0\"> </span>Linear 132.3 1.56% European Investment <span class=\"_ _2\"></span>Bank<span class=\"_ _e\"></span> 2025<span class=\"ls0\"> </span>At maturity 100.0 1.08% Commer<span class=\"_ _2\"></span>cial Paper<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>At maturity 60.0 -0.15% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2015<span class=\"_ _e\"></span> 2025<span class=\"ls0\"> </span>At maturity 498.6 1.88% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2015<span class=\"_ _e\"></span> 2023<span class=\"ls0\"> </span>At maturity 749.4 1.63% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2015<span class=\"_ _e\"></span> 2030<span class=\"ls0\"> </span>At maturity 139.3 2.63% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2016<span class=\"_ _e\"></span> 2028<span class=\"ls0\"> </span>At maturity 747.7 1.50% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2020<span class=\"_ _e\"></span> 2032<span class=\"ls0\"> </span>At maturity 747.4 1.11% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2020<span class=\"_ _e\"></span> 2040<span class=\"ls0\"> </span>At maturity 199.4 0.88% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2021<span class=\"_ _e\"></span> 2033<span class=\"ls0\"> </span>At maturity 498.1 0.88% Registered bond 2014 2044<span class=\"ls0\"> </span>At maturity 50.0 3.00% Loan with KfW 2026<span class=\"ls0\"> </span>At maturity 150.0 0.90% Total 7,740.5 Lease debts 118.8 Accrued interests 76.4 Total Loan<span class=\"_ _2\"></span>s and Borrowings (Current and Non-curr<span class=\"_ _e\"></span>ent) 7,935.7 Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.19. <span class=\"_ _92\"> </span>Le<span class=\"_ _e\"></span>asing THE <span class=\"_ _e\"></span>GROUP AS A LESSEE The <span class=\"_ _20\"></span>group <span class=\"_ _5d\"></span>mainly <span class=\"_ _20\"></span>leases <span class=\"_ _5d\"></span>buildings, <span class=\"_ _5d\"></span>cars <span class=\"_ _20\"></span>and <span class=\"_ _5d\"></span>optical <span class=\"_ _5d\"></span>fibres. <span class=\"_ _20\"></span>It <span class=\"_ _5d\"></span>also <span class=\"_ _5d\"></span>has <span class=\"_ _20\"></span>some <span class=\"_ _5d\"></span>rights <span class=\"_ _20\"></span>to <span class=\"_ _5d\"></span>use <span class=\"_ _20\"></span>(<span class=\"_ _e\"></span>portions) <span class=\"_ _20\"></span>of <span class=\"_ _5d\"></span>land <span class=\"_ _5d\"></span>and <span class=\"_ _5d\"></span>overh<span class=\"_ _2\"></span>ead <span class=\"_ _5d\"></span>li<span class=\"_ _e\"></span>nes. <span class=\"_ _5d\"></span>The<span class=\"_ _e\"></span> valuation period <span class=\"_ _e\"></span>used is <span class=\"_ _e\"></span>based <span class=\"_ _e\"></span>on <span class=\"_ _e\"></span>the cont<span class=\"_ _e\"></span>ractual ter<span class=\"_ _e\"></span>m. <span class=\"_ _e\"></span>Where a <span class=\"_ _e\"></span>fixed <span class=\"_ _e\"></span>term has<span class=\"_ _e\"></span> not <span class=\"_ _e\"></span>been s<span class=\"_ _e\"></span>et <span class=\"_ _e\"></span>and <span class=\"_ _e\"></span>an <span class=\"_ _e\"></span>ongoing ext<span class=\"_ _e\"></span>ension is <span class=\"_ _e\"></span>subject to <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>he contract<span class=\"_ _2\"></span>, <span class=\"_ _e\"></span>t<span class=\"_ _e\"></span>he <span class=\"_ _e\"></span>relevant <span class=\"_ _e\"></span>depa<span class=\"_ _e\"></span>rtment <span class=\"_ _e\"></span>has <span class=\"_ _e\"></span>set <span class=\"_ _20\"></span>an <span class=\"_ _e\"></span>assumed <span class=\"_ _e\"></span>termination <span class=\"_ _e\"></span>date. <span class=\"_ _20\"></span>In <span class=\"_ _e\"></span>the <span class=\"_ _20\"></span>even<span class=\"_ _2\"></span>t <span class=\"_ _e\"></span>that <span class=\"_ _20\"></span>the l<span class=\"_ _e\"></span>ease <span class=\"_ _e\"></span>contract <span class=\"_ _e\"></span>c<span class=\"_ _e\"></span>ontains <span class=\"_ _e\"></span>a <span class=\"_ _e\"></span>lease <span class=\"_ _e\"></span>ext<span class=\"_ _e\"></span>ension<span class=\"_ _e\"></span> option, the group<span class=\"_ _2\"></span> assesses whether it is reasonabl<span class=\"_ _e\"></span>y certain <span class=\"ls5b\">of</span> exercising the option and makes its best estimate of the termination date. The COVID-<span class=\"ls78\">19<span class=\"_ _2\"></span><span class=\"ls0\"> <span class=\"ff42\">pandemic <span class=\"_ _2\"></span>did not affected the contractual clauses of Elia Group\u2019s le<span class=\"ff3f\">ase contracts and there were no<span class=\"_ _e\"></span> indications leading </span></span></span></span>to changes in the asse<span class=\"_ _2\"></span>ssment (which was <span class=\"_ _e\"></span>used in the previous reporting period) related to the extension of the contracts.<span class=\"_ _e\"></span> Information abou<span class=\"_ _2\"></span>t leases for which the g<span class=\"_ _e\"></span>roup is a lessee is prese<span class=\"_ _2\"></span>nted below.<span class=\"_ _e\"></span> Right-<span class=\"ls105\">of</span>-use assets<span class=\"ff3f fs8\"> </span>Right-<span class=\"ls5b\">of</span>-<span class=\"ff42\">use assets are presented separately within \u2018Property, plant and equ<span class=\"_ _2\"></span>ipment\u2019<span class=\"ff3f\"> <span class=\"_ _e\"></span><span class=\"ls5b\">and </span>c<span class=\"_ _e\"></span>an be broken down in the table below<span class=\"ls1d\">, </span>with the </span></span>discounted lease liability for<span class=\"_ _2\"></span> comparison. The split betwee<span class=\"_ _e\"></span>n current and non-current lease liabilities also provided:<span class=\"_ _e\"></span> Use of<span class=\"_ _2\"></span> land and Rent of (in \u20ac million)<span class=\"ff40\"> </span>overhead buildings / lines offices Cars Optical fiber Other Total As of 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 40.0  23.6  14.1  3.7  1.4  82.8  Additions and remeasurements 3.4  16.7  6.1  23.4  0.0  49.6  Depreciation (1.2) (5.3) (5.5) (2.6) (0.2) (14.8) Derecogn<span class=\"_ _2\"></span>ition of right<span class=\"_ _e\"></span>-<span class=\"ls5b\">of</span>-use assets 0.0  (0.0) (0.0) 0.0  0.0  (0.0) As of 31 Dece<span class=\"_ _2\"></span>mber 2021<span class=\"_ _e\"></span> 42.1 35.0 14.7 24.5 1.2 117.5 Use of<span class=\"_ _2\"></span> land and Rent of (in \u20ac million)<span class=\"ff40\"> </span>overhead buildings / lines offices Cars Optical fiber Other Total As of 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 42.1  34.9  14.7  24.5  1.1  117.5  Additions and remeasurements 1.3  (0.1) 4.7  0.2  0.4  6.5  Depreciation (1.3) (6.0) (5.6) (0.5) (0.1) (13.5) Derecogn<span class=\"_ _2\"></span>ition of right<span class=\"_ _e\"></span>-<span class=\"ls5b\">of</span>-use assets 0.0  (0.0) (0.1) (22.0) 0.0  (22.1) As of 31 Dece<span class=\"_ _2\"></span>mber 2022<span class=\"_ _e\"></span> 42.2 28.9 13.7 2.3 1.5 88.5 The r<span class=\"_ _2\"></span>ight-<span class=\"ls78\">of</span>-u<span class=\"_ _2\"></span>se assets are briefly described below:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> use of land and overhead lines constitutes a right for the group to use a well identified piece of land to build <span class=\"ff42\">on someone\u2019s </span></span></span>property. On<span class=\"_ _2\"></span>ly the contracts under which t<span class=\"_ _e\"></span>he group has the full righ<span class=\"_ _2\"></span>t to control the use of the identified asset are in scope.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> <span class=\"ls78\">gr<span class=\"ls5b\">oup</span></span> leases buildings and offices in which<span class=\"_ _2\"></span> corporate functions are performed.<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> group has car leasing contracts which are used by employees for business and private activities.<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> group leases optical fibres to transmit data. Only cables that are clea<span class=\"_ _e\"></span>rly identified are in scope. </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Other<span class=\"_ _2\"></span> lease contracts: printer lease contracts and strategic reserves contracts. Strategic reserves are contracts where the Gro<span class=\"_ _e\"></span>up </span></span>has the right <span class=\"_ _2\"></span>to control the use of a power plant to maintain a balance on the grid.<span class=\"_ _e\"></span> The g<span class=\"_ _2\"></span>roup only <span class=\"_ _2\"></span>has lease <span class=\"_ _2\"></span>contracts with <span class=\"_ _4b\"></span>fixe<span class=\"_ _e\"></span>d lease <span class=\"_ _2\"></span>payments and <span class=\"_ _2\"></span>assesses whether <span class=\"_ _2\"></span>it <span class=\"_ _2\"></span>is reasonable <span class=\"_ _2\"></span>to extend a <span class=\"_ _4b\"></span>le<span class=\"_ _e\"></span>ase contract<span class=\"_ _2\"></span>. If <span class=\"_ _2\"></span>so, the lease contract is va<span class=\"_ _2\"></span>lued as if the extension were exercised. Lease liabilities<span class=\"ff3f fs8\"> </span>Information concerning the ma<span class=\"_ _2\"></span>turity of the contractual undiscounted cash flows is p<span class=\"_ _e\"></span>rovided below: Matu<span class=\"_ _2\"></span>rity analysis - contractual undiscounted cash flow<span class=\"_ _e\"></span>s (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>&lt; 1 year 14.2  32.9  1-5 years 35.1  30.2  &gt; 5 years 54.1  58.0  Total undiscount<span class=\"_ _2\"></span>ed lease liabilities at 31 December<span class=\"_ _e\"></span> 103.4 121.1 Lease liabilities in<span class=\"_ _2\"></span> the statement of financial position at 31 December<span class=\"_ _e\"></span> 90.2 118.8 Curren<span class=\"_ _2\"></span>t 13.2  35.1  Non-current 77.0  83.7  The d<span class=\"_ _2\"></span>iscount rate used to discount the lease liabilities is the g<span class=\"ff42\">roup\u2019s best estimate of the weighted average incremental borrowing rate. </span>The group<span class=\"_ _2\"></span> made use of the practical expedients, i.e. a single discount rate per group of contracts, summarised per their duration.<span class=\"_ _20\"></span> The group<span class=\"_ _2\"></span> has assessed the extension options concluded<span class=\"_ _e\"></span> in the lea<span class=\"_ _2\"></span>se contracts and considers it reasonably likely that these extension options will be<span class=\"_ _2\"></span> executed. The Group has therefore considered the lease contract as if the extension option is exercised in the<span class=\"_ _e\"></span> lease liability.  The group<span class=\"_ _2\"></span> has no lease contracts with variable payments <span class=\"_ _e\"></span>nor r<span class=\"_ _2\"></span>esidual value guarantees. The <span class=\"_ _e\"></span>group did not commit to any lease that has not yet commenced. The group has no contracts <span class=\"_ _2\"></span>which in<span class=\"_ _e\"></span>clude contingent rental payments nor include any escalation clauses or restriction<span class=\"_ _2\"></span>s that are significant <span class=\"_ _e\"></span>regarding the use of the asset in question.  In 2021, an optical fibre lea<span class=\"_ _2\"></span>se contract coming to maturity was prolonged and a purchase option for a value of \u20ac22.0 million<span class=\"_ _e\"></span><span class=\"ff3f\"> was added. </span>The purcha<span class=\"_ _2\"></span>se option came to <span class=\"_ _e\"></span>maturity at the end of February 2022 and the group exercised the option.<span class=\"_ _e\"></span><span class=\"ff40 fs11\"> </span>Amounts recognised in profit and loss<span class=\"ff3f fs8\"> </span>The fo<span class=\"_ _2\"></span>llowing amounts were recognised in profit and loss for the financial year: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Depreciation expense o<span class=\"_ _2\"></span>f right-<span class=\"ls5b\">of</span>-<span class=\"_ _e\"></span>use assets<span class=\"_ _e\"></span> 13.3  14.7  Intere<span class=\"_ _2\"></span>st on lease liabilities<span class=\"_ _e\"></span> 1.3  1.8  Expenses re<span class=\"_ _2\"></span>lating to short-term leases<span class=\"_ _e\"></span> 0.2  0.7  Expenses re<span class=\"_ _2\"></span>lating to low-value assets<span class=\"_ _e\"></span> 0.4  0.5  Total recognised in p<span class=\"_ _2\"></span>rofit and loss 15.1 17.8 A total of \u20ac<span class=\"_ _2\"></span>15.1 <span class=\"_ _e\"></span><span class=\"ff3f\">million in lease expenses was recognised in the statement of profit or loss in 2022. There were no variable lease </span>paymen<span class=\"_ _2\"></span>ts included in the measurement of lease liabilities.<span class=\"_ _e\"></span> The total cash<span class=\"_ _2\"></span> outf<span class=\"ff42\">low for leases amounted to \u20ac13.3 millio<span class=\"_ _e\"></span>n in 2022 (\u20ac15.4 million </span>in 2021). <span class=\"ff42\">This amount is included in the \u201cRepayment </span>of borrowings\u201d of the cash<span class=\"_ _2\"></span> flow statement.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>THE GROUP AS A LESSOR<span class=\"ff3f\"> </span>The group<span class=\"_ _2\"></span> leases out optical fibres, land and buildings, which are <span class=\"ff42\">presented as part of \u2018Property, plant and equipment\u2019. Leasing is </span>only an ancillar<span class=\"_ _2\"></span>y business. Rental income is presented under \u2018<span class=\"_ _e\"></span>Other income\u2019.<span class=\"ff3f\"> </span>Contracts <span class=\"_ _2\"></span>that do not relate to separately identifiable asse<span class=\"_ _e\"></span>ts or under wh<span class=\"_ _2\"></span>ich the customer cannot directly the use of the ass<span class=\"_ _e\"></span>et or does not substantia<span class=\"_ _2\"></span>lly obtain all the economic benefits associated <span class=\"_ _e\"></span>with the use of the asset do not con<span class=\"_ _2\"></span>stitute a lease. The ne<span class=\"_ _e\"></span>w lease de<span class=\"_ _2\"></span>finition led to the e<span class=\"_ _2\"></span>xclusion of some telecommunication equipment<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> has classified these leases as operating leases as they do not substantially transfer all the <span class=\"_ _e\"></span>risks and rewards incidental to the ownership<span class=\"_ _2\"></span> of the assets.  The fo<span class=\"_ _2\"></span>llowing table sets out a maturity analysis of lease payments, showing the undiscounted lease payments to be received af<span class=\"_ _e\"></span>ter the repor<span class=\"_ _2\"></span>ting date and considering the best estimate of the co<span class=\"_ _e\"></span>ntractual term:<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Within 1 year 13.4  12.9  1 to 2 years 12.7  12.2  2 to 3 years 15.0  12.1  3 to 4 years 12.2  12.0  4 to 5 years 16.7  11.9  More than 5 year<span class=\"_ _2\"></span>s 304.3  308.6  Total 374.2 369.8 The COVID-19 pandemic d<span class=\"_ _2\"></span>id <span class=\"ff42\">not affected the contractual clauses of Elia Group\u2019s contracts as a lessor and there were no indicators to </span>change the ca<span class=\"_ _2\"></span>sh flows as mentioned here above.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> <span class=\"ff42\">recognised \u20ac</span><span class=\"ls5b\">15</span>.2 <span class=\"_ _e\"></span>million in re<span class=\"ff42\">ntal income in 2022 (2021: \u20ac15.0</span> million).",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfLeasesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__54-1": {
   "value": "6.1. <span class=\"_ _87\"> </span>Property, plant and equipment (in \u20ac million)<span class=\"ff40\"> </span>Leasing Machinery Furniture Other Assets Land and and and and tangible<span class=\"_ _2\"></span> under Total buildings similar equipment vehic<span class=\"_ _2\"></span>les<span class=\"_ _e\"></span> assets construct<span class=\"_ _2\"></span>ion rights ACQUISITION VALUE Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> 430.8 11,179<span class=\"_ _2\"></span>.4<span class=\"_ _e\"></span> 343.8 31.5 117.0 1,713.0 13,815<span class=\"_ _2\"></span>.6<span class=\"_ _e\"></span> Additions 10.6 179.8 36.0 0.9 49.6 956.0 1,232.8 Disposals (3.3) (87.1) (42.6) (0.2) (0.4) 0.0 (133.6) Transfers 27.6 503.0 35.1 2.9 0.0 (570.1) (1.5) Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021<span class=\"ls0\"> </span>465.8 11,775<span class=\"_ _2\"></span>.0<span class=\"_ _e\"></span> 372.3 35.1 166.1 2,098.8 14,913<span class=\"_ _2\"></span>.2<span class=\"_ _e\"></span> Balance at 1 Janua<span class=\"_ _2\"></span>ry 2022<span class=\"_ _e\"></span> 465.8 11,775<span class=\"_ _2\"></span>.0<span class=\"_ _e\"></span> 372.3 35.1 166.1 2,098.8 14,913<span class=\"_ _2\"></span>.2<span class=\"_ _e\"></span> Additions 9.3 334.0 34.7 0.1 (15.6) 1,130.1 1,492.6 Disposals (1.8) (82.6) (8.4) 0.0 0.5 (0.7) (93.0) Transfers 3.6 718.9 105.6 11.1 0.0 (838.0) 1.1 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022<span class=\"ls0\"> </span>476.8 12,745<span class=\"_ _2\"></span>.3<span class=\"_ _e\"></span> 504.2 46.4 151.0 2,390.1 16,313<span class=\"_ _2\"></span>.8<span class=\"_ _e\"></span> ACCUMULATED DEPRECIATION AND IMPAIRMENT Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> (36.1) (3,416.0) (205.7) (29.2) (34.2) 0.0 (3,721.2) Depreciation (6.6) (381.5) (39.7) (1.1) (14.8) (443.6) Disposals 2.2 68.6 39.7 0.1 0.4 111.<span class=\"ls0\">1 </span>Transfers 0.0 2.3 0.0 (2.3) 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021<span class=\"ls0\"> </span>(40.5) (3,726.6) (205.7) (32.4) (48.6) 0.0 (4,053.7) Balance at 1 Janua<span class=\"_ _2\"></span>ry 2022<span class=\"_ _e\"></span> (40.5) (3,726.6) (205.7) (32.4) (48.6) 0.0 (4,053.7) Depreciation (6.2) (404.1) (59.1) (0.6) (13.5) (483.6) Disposals 1.2 59.4 8.1 0.0 (0.5) 68.2 Transfers 0.0 11.0 0.0 (11.0) 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022<span class=\"ls0\"> </span>(45.5) (4,060.3) (256.7) (44.0) (62.5) 0.0 (4,469.1) CARRYING AMOUNT Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 394.7 7,763.4 138.1 2.3 82.8 1,713.1 10,094<span class=\"_ _2\"></span>.4<span class=\"_ _e\"></span> Balance at 31 December<span class=\"_ _2\"></span> 2021 425.3 8,048.4 166.6 2.8 117.5 2,098.9 10,859<span class=\"_ _2\"></span>.5<span class=\"_ _e\"></span> Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 425.3 8,048.4 166.6 2.8 117.5 2,098.9 10,859<span class=\"_ _2\"></span>.5<span class=\"_ _e\"></span> Balance at 31 December<span class=\"_ _2\"></span> 2022 431.4 8,684.9 247.4 2.3 88.5 2,390.1 11,844<span class=\"_ _2\"></span>.7<span class=\"_ _e\"></span> Large-scale (onshore and o<span class=\"_ _2\"></span>ffshore) infrastructure projects<span class=\"_ _e\"></span> in both Belgium and Germany are underway. These<span class=\"_ _2\"></span> projects are focusing on<span class=\"_ _e\"></span> strengthening both<span class=\"_ _2\"></span> the Belgian and German grids, d<span class=\"_ _e\"></span>eveloping the necessary offshore infrastructures to allow the integration of increasing<span class=\"_ _2\"></span> amounts of renewable energy into the grid and the digitalization of the infrastructure. The acceleration of<span class=\"_ _e\"></span> the energy transition and the current in<span class=\"_ _2\"></span>flationary environment are driving the investments of the Group.<span class=\"_ _e\"></span> In Belgium, <span class=\"_ _2\"></span>Elia Transmissi<span class=\"ff42\">on made investments totalling <span class=\"_ _e\"></span>\u20ac403.2 million in property, p<span class=\"_ _2\"></span>lant and equipment. In 2022, <span class=\"_ _e\"></span>159 replacement </span>projects o<span class=\"_ _2\"></span>ccurred across the Belgian grid, amounting to a total investment of \u20ac113.4 million. Around \u20ac60 million was invested<span class=\"ff3f\"> in </span>suppor<span class=\"_ _2\"></span>ting the digitalisation of our infrastructure and the d<span class=\"_ _e\"></span>evelopment of new tools. The reinforcement <span class=\"_ _2\"></span>works betwe<span class=\"_ _e\"></span>en Avelgem and Avelin, which forms pa<span class=\"_ _2\"></span>rt of the 380 kV backbone between Mercator and France, had been successfully finalised by the end of th<span class=\"_ _e\"></span>e year. Construction wor<span class=\"ff42\">ks continued along the Massenhoven Van Eyck Corridor (\u20ac32.7 million) and the Mercato<span class=\"_ _2\"></span>r Bruegel <span class=\"_ _e\"></span>Corridor (\u20ac33.9 </span>million). An im<span class=\"_ _2\"></span>portant milestone was reached with the commissioning of a new 380 kV GIS substation, two 380 kV phase shifters a<span class=\"_ _e\"></span>nd a 380 kV compens<span class=\"ff42\">ator in Zand<span class=\"_ _2\"></span>vliet (\u20ac12.1 million). In Q3<span class=\"ff3f\">-20<span class=\"_ _e\"></span>22, work began in Rimi\u00e8re on the construction of a new 380 kV subst<span class=\"_ _2\"></span>ation and </span></span>the extension o<span class=\"_ _2\"></span>f the existing 220 kV substation (\u20ac11.9 mill<span class=\"_ _e\"></span>ion); th<span class=\"_ _2\"></span>is project aims to create the required hosting capacity fo<span class=\"_ _e\"></span><span class=\"ff3f\">r the new CRM </span>power p<span class=\"_ _2\"></span>lants in Les Awirs &amp; Seraing by 2025.<span class=\"_ _e\"></span> In Germany, 50Hertz<span class=\"_ _2\"></span> Transmission invested \u20ac<span class=\"ff3f\">1,0<span class=\"_ _e\"></span>89.3 million in proper<span class=\"_ _2\"></span>ty, plant and equipment. The most significant onshore investment </span>is <span class=\"ff42\">the DC line SuedOstLink <span class=\"_ _2\"></span>(\u20ac210.0 million). It plays an important role <span class=\"ff3f\">in connecting the growing (offshore) production in the north of </span></span>German<span class=\"_ _2\"></span>y with the consumption centres in the South. In or<span class=\"_ _e\"></span>der to reinforce the existin<span class=\"_ _2\"></span>g grid, the upgrading of high<span class=\"_ _e\"></span>-vol<span class=\"_ _e\"></span>tage pylons to boost opera<span class=\"_ _2\"></span>tional safety was accelerated in 2022 (\u20ac54.7<span class=\"ff3f\"> million<span class=\"_ _e\"></span>). Another important milestone was reached for the replacement of the old </span>Uckermar<span class=\"_ _2\"></span>k line with the successful settlement of a lawsuit after 17 years. The investment for this reinforcement consists of <span class=\"_ _e\"></span>the overhead line in the<span class=\"_ _2\"></span> southern Uckermark region (\u20ac5<span class=\"ff3f\">3.1 <span class=\"_ _e\"></span></span>million) and the overhead line in the northern Uckermar<span class=\"_ _2\"></span>k region (\u20ac46.9<span class=\"_ _e\"></span><span class=\"ff3f\"> million). Other </span>important on<span class=\"_ _2\"></span>shore projects to strengthen our onshore grid<span class=\"_ _e\"></span> are the re<span class=\"_ _2\"></span>structuring of the substation Lauchst\u00e4dt with S<span class=\"_ _e\"></span>TATCOM and MSCDN (\u20ac35.0<span class=\"_ _2\"></span> million) and the restructu<span class=\"_ _e\"></span>ring and reinforcement of the<span class=\"_ _2\"></span> overhead line between Wolmirstedt and G\u00fcs<span class=\"_ _e\"></span>trow (\u20ac34.6 million). Offshore investments mainly fo<span class=\"_ _2\"></span>cused on the Ostwind 2 project (\u20ac186.3 million), with the next offshore wind farm connection (O<span class=\"ff3f\">stwind <span class=\"_ _e\"></span>3) </span>already advan<span class=\"_ _2\"></span>cing along the <span class=\"ff42\">project pipeline (\u20ac82.5 million).<span class=\"_ _e\"></span></span> During 2022, \u20ac24.2<span class=\"_ _2\"></span> million of borrowing costs were capitalised on assets under construction. An amount of \u20ac6.1 million based <span class=\"_ _e\"></span><span class=\"ff3f\">on an </span>average interest rate o<span class=\"_ _2\"></span>f 1.91% originated <span class=\"ff42\">from th<span class=\"_ _e\"></span>e Elia Transmission Belg<span class=\"_ _2\"></span>ium segment (\u20ac7.8 <span class=\"_ _e\"></span><span class=\"ff3f\">million at 2.03% in 2021). An amount of </span></span>\u20ac18.1 million ba<span class=\"_ _2\"></span>sed on an average interest rate of 1.44% was accounted for in the 50Hertz Transmission segment (\u20ac13.5 million<span class=\"_ _e\"></span><span class=\"ff3f\"> at </span>0.98% in 2021). There were<span class=\"_ _2\"></span> no mortgages, pledges or similar securities on PP&amp;<span class=\"_ _e\"></span>E relating to loans. Outstand<span class=\"_ _2\"></span>ing capital expenditure commitments are describ<span class=\"_ _e\"></span>ed in Note 8.2. The analysis of lease liabilities is presented in note 6.19.<span class=\"_ _e\"></span> Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.8.2. <span class=\"_ _87\"> </span>Commitments and contingencies CAPITAL-EXPENDITURE COMMITMENT As at 31 December<span class=\"_ _2\"></span> 2022, the group ha<span class=\"_ _e\"></span>d a commitment of <span class=\"ff42\">\u20ac</span>3,<span class=\"ls5b\">883</span>.9 million (<span class=\"ff42\">\u20ac</span>2,068.4 million in 2021) relating to purchase contracts for the installa<span class=\"_ _2\"></span>tion of property, plant and equipment for further grid extensions.<span class=\"_ _e\"></span>  OTHER C<span class=\"_ _e\"></span>ON<span class=\"_ _2\"></span>TINGENCIES AND COMMITMENTS As at 31 December<span class=\"_ _2\"></span> 2022, the group <span class=\"ls5b\">ha<span class=\"_ _e\"></span></span>d a commitment of <span class=\"ff42\">\u20ac</span><span class=\"ls5b\">347</span>.9 million (<span class=\"ff42\">\u20ac</span>263.5 million in 2021) r<span class=\"_ _e\"></span>elating to purchase contracts for general expenses, maintenance and repa<span class=\"_ _2\"></span>ir costs.<span class=\"_ _e\"></span> Having rece<span class=\"_ _2\"></span>ived approval from the Walloon government a<span class=\"_ _e\"></span>nd from the<span class=\"_ _2\"></span> CREG, on 22 June 2015 E<span class=\"_ _e\"></span>lia entered into an agreement with Solar Chest f<span class=\"_ _2\"></span>or the sale of Walloon green certificates with a total value of \u20ac275 million. Solar Chest's mission is to buy, h<span class=\"ff3f\">old a<span class=\"_ _e\"></span>nd sell </span>Walloon gr<span class=\"_ _2\"></span>een certificates for periods of five, six and seven years. In accordance<span class=\"_ _e\"></span> with legislation, Solar Chest conducted several auctions.  Since June 2015, <span class=\"_ _2\"></span>Elia has been obliged to buy back from S<span class=\"_ _e\"></span>olar Chest t<span class=\"_ _2\"></span>he green certificates that the latter could not sell on <span class=\"_ _e\"></span>the mark<span class=\"_ _e\"></span>et in due time. At the<span class=\"_ _2\"></span> auction it organized in February 2022, So<span class=\"_ _e\"></span>lar Chest sold all the green certificates it st<span class=\"_ _2\"></span>ill held at that time to the market. In September 2022, Solar<span class=\"_ _2\"></span> Chest's activities were terminated and it was dissolved. The aforementioned obligation to buy back the certificates <span class=\"_ _2\"></span>from Elia has therefore not been ap<span class=\"_ _e\"></span>plied in any concrete case and is no longer applicable. In September 2017<span class=\"_ _2\"></span>, Elia sold 2.8 million green certificates to the Walloon Region (i.e. the Walloon Agency for Air and Climat<span class=\"_ _e\"></span>e, or AwA<span class=\"_ _e\"></span>C) leading t<span class=\"_ _2\"></span>o a net cash inflow of \u20ac181.2 million. This <span class=\"ff3f\">was a r<span class=\"_ _e\"></span>esult of the Decree of 29 June 2017 amending the Decree of 12 April 2011 </span>relating to the<span class=\"_ _2\"></span> organisation of the regional electricity market and the Decree of 5 March 2008 relating to the creation of th<span class=\"_ _e\"></span>e Walloon Agency for Air<span class=\"_ _2\"></span> and Climate. The green certificates transfe<span class=\"_ _e\"></span>rred b<span class=\"_ _2\"></span>y El<span class=\"_ _e\"></span>ia can be gradually resold b<span class=\"_ _2\"></span>y the AwAC from 2022 onwards, taking into account the mar<span class=\"_ _2\"></span>ket conditions that exist for green certificates at that time. The legislation also envisages the green c<span class=\"_ _e\"></span>ertificates being held by the AwAC for a period of up to n<span class=\"_ _2\"></span>ine years, after w<span class=\"_ _e\"></span>hich Elia is requ<span class=\"_ _2\"></span>ired to buy back any unsold certificates. These repurchase commitments will have<span class=\"_ _2\"></span> no impact on Elia's financial performance, as the cost and expense for the repurchase will be fully recov<span class=\"_ _e\"></span>ered through the<span class=\"_ _2\"></span> tariffs for levies. The legislation was supplemented in 2021 by new provisions that allow the Government to decide, after consultation with th<span class=\"_ _2\"></span>e LTSO, on the gradual resale to Elia of certain quantities of green certificates held by AwAC.<span class=\"_ _e\"></span> In November 2018, <span class=\"ff42\">Elia so<span class=\"_ _2\"></span>ld another \u20ac0.7 million in green certificates to the Walloon Region (i.e. the AwAC) which resulted in a net </span>cash inflow of \u20ac43.3 million. <span class=\"_ _2\"></span>As with the transaction in September 2017, Elia might be required to buy back some of the certi<span class=\"_ _e\"></span><span class=\"ff3f\">ficates sold </span>fr<span class=\"ls0\">om 2023 onwards. Any repurchase will be co<span class=\"_ _2\"></span>vered throu<span class=\"_ _e\"></span>gh the tariffs for levie<span class=\"_ _2\"></span>s. There were no transactions for sale of green </span>certificates <span class=\"_ _2\"></span>to the AwAC in 2019, 2020, 2021 or 2022. C<span class=\"_ _e\"></span>onsidering (i) the state of the Walloon green certificate market and (ii) th<span class=\"ls78\">e </span>amoun<span class=\"_ _2\"></span>ts actually available following the application of the surcharge in 2022, the Walloon Government has decided to ask Elia<span class=\"_ _e\"></span> to buy back certif<span class=\"_ _2\"></span>icates held by AwAC for an amount of \u20ac45.5 million.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>In Germany, offshore expenses between 50Hertz and TenneT<span class=\"_ _2\"></span> <span class=\"_ _e\"></span>TSO arising from the horizontal sett<span class=\"_ _2\"></span>lement <span class=\"_ _e\"></span>has given rise to financial obligation<span class=\"_ _2\"></span>s for 50Hertz in future periods. The total amount<span class=\"_ _e\"></span> of these future <span class=\"ff42\">cumulative amounts comes to \u20ac</span>0.3 million<span class=\"_ _e\"></span> (prior yea<span class=\"ff42\">r: \u20ac</span>3.9 million<span class=\"ff42\">) and will be r<span class=\"_ _2\"></span>eflected in 50Hertz\u2019s networ<span class=\"ff3f\">k use<span class=\"_ _e\"></span>r charge calculations over the coming years following the corresponding billing b<span class=\"_ _2\"></span>y </span></span>TenneT T<span class=\"_ _2\"></span>SO.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfPropertyPlantAndEquipmentExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__59": {
   "value": "6.2. <span class=\"_ _87\"> </span>Intangible assets (in \u20ac million)<span class=\"ff40\"> </span>Development<span class=\"_ _2\"></span> Licenses/ Other intangib<span class=\"_ _2\"></span>le Total costs of<span class=\"_ _2\"></span> softw<span class=\"_ _e\"></span>are concessions assets ACQUISITION VALUE Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> 209.0 29.6 0.0 238.5 Additions 61.5 4.9 0.0 66.4 Disposals (2.7) 0.0 0.0 (2.7) Transfers 0.6 0.0 0.9 1.5 Balance at 31 Dece<span class=\"_ _2\"></span>mber 2021 268.4 34.5 0.9 303.8 Balance at 1 Janua<span class=\"_ _2\"></span>ry 2022<span class=\"_ _e\"></span> 268.4 34.5 0.9 303.8 Additions 89.5 3.1 0.6 93.2 Disposals 0.0 0.0 0.0 0.0 Transfers (1.1) 0.0 0.0 (1.1) Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 356.8 37.6 1.6 395.9 ACCUMULATED DEPRECIATION AND IMPAIRMENT Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> (125.4) (7.8) 0.0 (133.1) Depreciation (21.4) (2.9) (0.2) (24.5) Disposals 2.5 (0.2) 0.0 2.4 Transfers 0.0 0.0 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 (144.2) (10.8) (0.2) (155.2) Balance at 1 January 2022 (144.2) (10.8) (0.2) (155.2) Depreciation (26.3) (3.5) (0.3) (30.2) Disposals 0.0 0.0 0.0 0.0 Transfers 0.0 0.0 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 (170.5) (14.4) (0.5) (185.4) CARRYING AMOUNT Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 83.6 21.8 0.0 105.<span class=\"ls0\">4 </span>Balance at 31 December<span class=\"_ _2\"></span> 2021 124.2 23.6 0.8 148.6 Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 124.2 23.6 0.8 148.6 Balance at 31 December<span class=\"_ _2\"></span> 2022 186.3 23.2 1.1 210.5 Software comprise<span class=\"_ _2\"></span>s both IT applications developed by the <span class=\"_ _e\"></span>Group for operating the grid and software for the Group's norma<span class=\"_ _2\"></span>l business opera<span class=\"_ _2\"></span>tions.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> invested a total amount of \u20ac93.2 million, of which \u20ac45.8 million in Elia Transmission Belgium, \u20ac46.7 mi<span class=\"ff3f\">lli<span class=\"_ _e\"></span>on in 50Hertz </span>Transmission a<span class=\"_ _2\"></span>nd \u20ac0.7 million in the non<span class=\"ff3f\">-<span class=\"_ _e\"></span>regulated activities and Nemo L<span class=\"_ _2\"></span>ink segment. <span class=\"_ _e\"></span> </span>During 2022, \u20ac0.6<span class=\"ff3f\"> m<span class=\"_ _2\"></span>illion in borrowing costs were capitalised on <span class=\"ff42\">software in development (compared with \u20ac0.3</span> <span class=\"_ _e\"></span>million in 2021) in the </span>Elia Transm<span class=\"_ _2\"></span>ission Belgium segment, based on an averag<span class=\"_ _e\"></span>e interest rate of 1.91% (1.92% in 2021<span class=\"ls8f\">).</span> No borrowing co<span class=\"_ _e\"></span>sts on software in development were ca<span class=\"_ _2\"></span>pitalised in the 50Hertz Transmission segment.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> does not hold individual intangible asse<span class=\"_ _e\"></span>ts that are material to its financial statements, except capacity e<span class=\"_ _e\"></span>ntitlements <span class=\"ls1c\">in</span> the Kontek cable<span class=\"_ _2\"></span> (Denmark) that amount to <span class=\"ff42\">\u20ac16.5 million (</span>wit<span class=\"_ _e\"></span>h a remaining useful life of 10 years (until 2033)).",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIntangibleAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__57-1": {
   "value": "6.2. <span class=\"_ _87\"> </span>Intangible assets (in \u20ac million)<span class=\"ff40\"> </span>Development<span class=\"_ _2\"></span> Licenses/ Other intangib<span class=\"_ _2\"></span>le Total costs of<span class=\"_ _2\"></span> softw<span class=\"_ _e\"></span>are concessions assets ACQUISITION VALUE Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> 209.0 29.6 0.0 238.5 Additions 61.5 4.9 0.0 66.4 Disposals (2.7) 0.0 0.0 (2.7) Transfers 0.6 0.0 0.9 1.5 Balance at 31 Dece<span class=\"_ _2\"></span>mber 2021 268.4 34.5 0.9 303.8 Balance at 1 Janua<span class=\"_ _2\"></span>ry 2022<span class=\"_ _e\"></span> 268.4 34.5 0.9 303.8 Additions 89.5 3.1 0.6 93.2 Disposals 0.0 0.0 0.0 0.0 Transfers (1.1) 0.0 0.0 (1.1) Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 356.8 37.6 1.6 395.9 ACCUMULATED DEPRECIATION AND IMPAIRMENT Balance at 1 Janua<span class=\"_ _2\"></span>ry 2021<span class=\"_ _e\"></span> (125.4) (7.8) 0.0 (133.1) Depreciation (21.4) (2.9) (0.2) (24.5) Disposals 2.5 (0.2) 0.0 2.4 Transfers 0.0 0.0 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 (144.2) (10.8) (0.2) (155.2) Balance at 1 January 2022 (144.2) (10.8) (0.2) (155.2) Depreciation (26.3) (3.5) (0.3) (30.2) Disposals 0.0 0.0 0.0 0.0 Transfers 0.0 0.0 0.0 0.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 (170.5) (14.4) (0.5) (185.4) CARRYING AMOUNT Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 83.6 21.8 0.0 105.<span class=\"ls0\">4 </span>Balance at 31 December<span class=\"_ _2\"></span> 2021 124.2 23.6 0.8 148.6 Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 124.2 23.6 0.8 148.6 Balance at 31 December<span class=\"_ _2\"></span> 2022 186.3 23.2 1.1 210.5 Software comprise<span class=\"_ _2\"></span>s both IT applications developed by the <span class=\"_ _e\"></span>Group for operating the grid and software for the Group's norma<span class=\"_ _2\"></span>l business opera<span class=\"_ _2\"></span>tions.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> invested a total amount of \u20ac93.2 million, of which \u20ac45.8 million in Elia Transmission Belgium, \u20ac46.7 mi<span class=\"ff3f\">lli<span class=\"_ _e\"></span>on in 50Hertz </span>Transmission a<span class=\"_ _2\"></span>nd \u20ac0.7 million in the non<span class=\"ff3f\">-<span class=\"_ _e\"></span>regulated activities and Nemo L<span class=\"_ _2\"></span>ink segment. <span class=\"_ _e\"></span> </span>During 2022, \u20ac0.6<span class=\"ff3f\"> m<span class=\"_ _2\"></span>illion in borrowing costs were capitalised on <span class=\"ff42\">software in development (compared with \u20ac0.3</span> <span class=\"_ _e\"></span>million in 2021) in the </span>Elia Transm<span class=\"_ _2\"></span>ission Belgium segment, based on an averag<span class=\"_ _e\"></span>e interest rate of 1.91% (1.92% in 2021<span class=\"ls8f\">).</span> No borrowing co<span class=\"_ _e\"></span>sts on software in development were ca<span class=\"_ _2\"></span>pitalised in the 50Hertz Transmission segment.<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> does not hold individual intangible asse<span class=\"_ _e\"></span>ts that are material to its financial statements, except capacity e<span class=\"_ _e\"></span>ntitlements <span class=\"ls1c\">in</span> the Kontek cable<span class=\"_ _2\"></span> (Denmark) that amount to <span class=\"ff42\">\u20ac16.5 million (</span>wit<span class=\"_ _e\"></span>h a remaining useful life of 10 years (until 2033)).6.3. <span class=\"_ _87\"> </span>Goodwill There were<span class=\"_ _2\"></span> no changes in goodwill during the years 2<span class=\"_ _e\"></span>021-2022. The carr<span class=\"_ _2\"></span>ying a<span class=\"_ _e\"></span>mount <span class=\"_ _2\"></span>is the following:<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Good<span class=\"_ _2\"></span>will<span class=\"_ _e\"></span> ACQUISITION VALUE Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 2,411.1 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 2,411.1 Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 2,411.1 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 2,411.1 The goodwill re<span class=\"_ _2\"></span>lates to the following business combinations and is allocated to the cash g<span class=\"_ _e\"></span>enerating unit (CGU) Elia Transmission for the acquisition o<span class=\"_ _2\"></span>f Elia Asset and Elia Engineering and to the CGU 50Hertz Transmission for the acquisition of the 20% stake <span class=\"_ _e\"></span>in Eurogrid Internationa<span class=\"_ _2\"></span>l: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>Acquisition Elia Asset <span class=\"ff42\">\u2013</span> 2002 1,700.1 Acquisition Elia Enginee<span class=\"_ _2\"></span>ring <span class=\"ff42\">\u2013</span> <span class=\"ls5b\">2004<span class=\"_ _e\"></span></span> 7.7 Acquisition Eurogrid In<span class=\"_ _2\"></span>ternational <span class=\"ff42\">\u2013</span> <span class=\"ls5b\">2018<span class=\"_ _e\"></span></span> 703.4 Total 2,411.1 IMPAIRMENT TEST FOR CASH-GENERATING UNITS CONTAINING GOODWILL According to<span class=\"_ _2\"></span> IFRS rules, goodwill should be tested for impairment <span class=\"ls5b\">on <span class=\"_ _e\"></span></span>at least an annual basis or upon the occurrence of a triggering event. Goodwill is alloca<span class=\"_ _2\"></span>ted to the CGUs Elia Transmission and 50Hertz Transmission for impairment te<span class=\"_ _2\"></span>sting. <span class=\"_ _e\"></span>Cas<span class=\"_ _e\"></span>h-generating units to which good<span class=\"_ _2\"></span>will has been allocated are tested for impairment at least annually. <span class=\"_ _e\"></span> The recoverable amou<span class=\"_ _2\"></span>nt of CGUs is determined by reference to a value in use that is calculated b<span class=\"_ _e\"></span>ased on different metho<span class=\"_ _2\"></span>ds (Discounted Cash F<span class=\"_ _2\"></span>low and Discounted Dividend Model) <span class=\"_ _e\"></span>using <span class=\"ff40\">cash flow projections</span> drawn up on the basis of the 2022 reforecast and the 2023-2027 bu<span class=\"_ _2\"></span>siness plan, as approved by the Ma<span class=\"_ _e\"></span>nagement Committee and the Board of Directors, and on extrapolated cash flows beyond that time frame<span class=\"_ _2\"></span>. <span class=\"_ _e\"></span><span class=\"ff40 fc1d\"> </span>The forecast<span class=\"_ _2\"></span>s and projections included in the reference scenario were determined on the basis of the estimated investment pla<span class=\"_ _e\"></span>ns, remuneration de<span class=\"_ _2\"></span>fined in the regulatory frameworks, market<span class=\"_ _e\"></span> evolution, market share and margin evolution<span class=\"ls1d\">. </span>As the <span class=\"ff42\">g<span class=\"_ _e\"></span>roup\u2019s </span>asset base consists of a<span class=\"_ _2\"></span>ssets with long useful liv<span class=\"_ _e\"></span>es, the <span class=\"ff42\">business plan\u2019s</span> projection period was set to encompass the coming two regulatory periods.<span class=\"_ _e\"></span> The <span class=\"ff40\">discount rate<span class=\"_ _2\"></span>s<span class=\"ff3f\"> used correspond to the weighted ave<span class=\"_ _e\"></span>rage cost of capital, which is adjusted in order to reflect the business, market, </span></span>country and currency risk relating<span class=\"_ _2\"></span> to each goodwill CGU r<span class=\"_ _e\"></span>eviewed. The d<span class=\"_ _2\"></span>iscount rates used are consistent with avail<span class=\"_ _e\"></span>abl<span class=\"_ _e\"></span>e external informa<span class=\"_ _2\"></span>tion sources.<span class=\"_ _e\"></span> The <span class=\"ff40\">g<span class=\"_ _2\"></span>rowth rates<span class=\"ff3f\"> associated with the terminal values <span class=\"ls5b\">do</span> <span class=\"_ _e\"></span>not exceed the inflation rate or the long-term average growth rate for the </span></span>market <span class=\"_ _2\"></span>to which the CGU is dedicated.<span class=\"_ _e\"></span> More details are p<span class=\"_ _2\"></span>rovided below by CGU.<span class=\"_ _e\"></span> Acquisi<span class=\"_ _e\"></span>tion<span class=\"_ _2\"></span> of Elia Asset and Elia Engineering In 2002, the<span class=\"_ _2\"></span> acquisition of Elia Asset by the Company for <span class=\"_ _e\"></span><span class=\"ff42\">\u20ac3,304.1</span> million resulted in a positive consolidation difference of \u20ac1,700<span class=\"_ _2\"></span>.1<span class=\"ff3f\"> million. This positive consolidation difference was the result of the difference between the acquisition value of th<span class=\"_ _2\"></span>is entity<span class=\"_ _e\"></span> an<span class=\"_ _e\"></span>d </span>the carrying amount of its<span class=\"_ _2\"></span> assets. This difference consists<span class=\"_ _e\"></span> of various aspect<span class=\"_ _2\"></span>s such as the fact that (i) Elia was appointed as a TSO for a period of 20<span class=\"_ _2\"></span> years (ii) Elia had unique resources in Belgium as <span class=\"ls1c\">it</span> owns the whole of ex<span class=\"_ _e\"></span>tra-high-voltage grid and owns 94% of the high-voltage grid (<span class=\"_ _2\"></span>or has the right to use this), and hence only Eli<span class=\"_ _e\"></span>a is entitled<span class=\"_ _2\"></span> to put forward a development plan and (iii) Elia had the relevant TSO know-how. At the date of a<span class=\"_ _2\"></span>cquisition, the description or the quantification in euros of these aspects could not be performed on an objective<span class=\"_ _e\"></span>, transparent and reliab<span class=\"_ _2\"></span>le basis and, the difference could not therefore be allocated to specific assets and was consi<span class=\"_ _e\"></span>dered unallocated. This difference<span class=\"_ _2\"></span> has consequently been recognised as goo<span class=\"_ _e\"></span>dwill since the initia<span class=\"_ _2\"></span>l adoption of IFRS in 2005. The regulatory <span class=\"_ _e\"></span>framework, in particular the<span class=\"_ _2\"></span> offsetting in the tariffs of the decommissioning of fixed assets, applicable from 2008 onwards, did not have an i<span class=\"_ _e\"></span>mpact on this accoun<span class=\"_ _2\"></span>ting treatment. The goodwill described above and the goodwill resulting from the acquisition<span class=\"_ _2\"></span> o<span class=\"_ _e\"></span>f Eli<span class=\"_ _e\"></span>a Engineering in 2004 were allocated to the<span class=\"_ _2\"></span> single cash-generating unit for the impairment test determined, since the income and expenses we<span class=\"_ _e\"></span>re generated by one activity, specifically 're<span class=\"_ _2\"></span>gulated activity in Belgium', which will also be considered one CGU.<span class=\"_ _e\"></span> As a result, the group assigned the carrying amount of the goodwill to<span class=\"_ _2\"></span> one unit, n<span class=\"_ _e\"></span>amely the regulated activity in Belgium. Since 2004, annual impairment <span class=\"_ _2\"></span>tests have been conducted and have not resulted in the r<span class=\"_ _e\"></span>ecognition of any impairment losses. The impairment te<span class=\"_ _2\"></span>st was conducted by an independent expert. This imp<span class=\"_ _e\"></span>airment test is based on the value in use and uses two main valuation methods to e<span class=\"_ _2\"></span>stimate the recoverable amount: 1<span class=\"_ _e\"></span>) a discounted cash flows method (DCF); and 2) a dividend discount model (DDM), b<span class=\"_ _2\"></span>oth of which are further detached in valuation variants de<span class=\"_ _e\"></span>pending on the terminal value calculation. Future cash f<span class=\"_ _2\"></span>lows and future dividends a<span class=\"_ _e\"></span>re based on a business plan for t<span class=\"_ _2\"></span>he period 2022-<span class=\"_ _e\"></span>2032. As the <span class=\"ff42\">group\u2019s </span>asset base consists of assets with long useful lives, the <span class=\"ff42\">business plan\u2019s</span> projection period was set to encompass the coming two regulatory periods. Note that the regulatory framewor<span class=\"_ _2\"></span>k within which Elia operates is characteris<span class=\"_ _e\"></span>ed by an allowed revenues basis structured around: 1) a fair remuneration of <span class=\"_ _2\"></span>the regulat<span class=\"ls5b\">ed</span> asse<span class=\"_ _e\"></span>t base; <span class=\"ls5b\">and <span class=\"_ _e\"></span></span>2) incentives to guarantee the continuity of supply and improve efficiency. Considering that the regulator will allow a f<span class=\"_ _2\"></span>air remuneration of the regul<span class=\"_ _e\"></span>at<span class=\"ls5b\">ed</span> asset base consistent with market expectations, the <span class=\"_ _e\"></span>estimated regulat<span class=\"ls5b\">ed</span> asset base for the last forecast year can be considered an indication of the terminal va<span class=\"_ _2\"></span>lue. T<span class=\"_ _e\"></span>his approach does not take into account potentia<span class=\"_ _2\"></span>l cash flows gene<span class=\"_ _e\"></span>rated by meeting or beating future efficiency targets. The va<span class=\"_ _2\"></span>luation methods are subject to different assumptions<span class=\"_ _e\"></span>, the most important of which are outlined below. 1.<span class=\"ls0\"> <span class=\"_ _53\"></span><span class=\"ff3f fs11 fc3\">Discounting <span class=\"_ _e\"></span>of future<span class=\"_ _2\"></span> cash flows (DCF-m<span class=\"_ _e\"></span>odels): </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity of 9.3%; </span></span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Risk-fr<span class=\"_ _2\"></span>ee-rate: 2.2% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Beta<span class=\"_ _2\"></span> 0.93 </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Equity m<span class=\"_ _2\"></span>arket risk premium 5.5% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Cou<span class=\"_ _2\"></span>ntry risk premium 1.0% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Sma<span class=\"_ _2\"></span>ll firm premium 1.0% </span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Pre-tax Cost of Debt of 3.8%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Corporate tax rate of 25%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Target gearing (D/(D+E)): 60%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Post-tax WACC: 5.4%. </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on two variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a 1.13x RAB multiple in 2032  </span></span>NB: as such, the RAB itself does not take into account the contribution that the incentive remuneration makes to the value creation<span class=\"_ _2\"></span> process.<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal <span class=\"_ _20\"></span>value <span class=\"_ _20\"></span>based <span class=\"_ _e\"></span>on<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>a <span class=\"_ _20\"></span>perpetual <span class=\"_ _e\"></span>g<span class=\"_ _e\"></span>rowth <span class=\"_ _20\"></span>rate <span class=\"_ _20\"></span>of <span class=\"_ _e\"></span>3.<span class=\"_ _e\"></span>3<span class=\"_ _e\"></span>%. <span class=\"_ _20\"></span>This <span class=\"_ _20\"></span>long<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>term <span class=\"_ _20\"></span>growth <span class=\"_ _20\"></span>rate <span class=\"_ _e\"></span>is <span class=\"_ _20\"></span>hi<span class=\"_ _e\"></span>gher <span class=\"_ _20\"></span>than <span class=\"_ _20\"></span>long<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>term <span class=\"_ _20\"></span>expected </span></span>inflation to<span class=\"_ _2\"></span> capture the returns generated from the si<span class=\"_ _e\"></span>gnificant investments in the business plan. 2.<span class=\"ls0\"> <span class=\"_ _53\"></span><span class=\"ff3f fs11 fc3\">Discounting <span class=\"_ _e\"></span>of future<span class=\"_ _2\"></span> dividends <span class=\"_ _e\"></span>(DDM-models):  </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity of 9.3% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on two variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on 1.13x RAB multiple in 2032<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> </span></span>NB: as such, th<span class=\"_ _2\"></span>e RAB<span class=\"_ _e\"></span> itself does <span class=\"_ _2\"></span>not take into account <span class=\"_ _e\"></span>the contribution of the incentive remuneration to the value creation process. o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a perpetual growth rate of 3.3<span class=\"_ _e\"></span><span class=\"ls24\">%.</span> Th<span class=\"_ _2\"></span>is approach assumes that the residual value consists <span class=\"_ _e\"></span>of profit </span></span>after tax less invest<span class=\"_ _e\"></span>ments and considers <span class=\"_ _e\"></span>net borrowings (i<span class=\"_ _e\"></span>n relation to th<span class=\"_ _e\"></span>e investments). <span class=\"_ _e\"></span>Howeve<span class=\"_ _e\"></span>r, profit <span class=\"_ _e\"></span>and thus di<span class=\"_ _e\"></span>vidend<span class=\"_ _e\"></span> paymen<span class=\"_ _2\"></span>ts in FY32 most likely does not yet reflect the (po<span class=\"_ _e\"></span>sitive) impact of the investments planned in FY26-FY32.<span class=\"_ _e\"></span> Conclusion: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> independent analysis, which was based on a <span class=\"ff42\">(\u20ac3,127 million)</span> midpoint of the different valuation approaches and variants </span></span>used did not result in<span class=\"_ _2\"></span> the identification of an<span class=\"_ _e\"></span> impairment of goodwill in the financial year 2022. Moreover, market multiples (based on current <span class=\"_ _2\"></span>enterprise values and current/forecasted EBITDA) were applied for plausibility.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">As the m<span class=\"_ _2\"></span>edian and the average of the different methods presented above w<span class=\"ff42\">er<span class=\"_ _e\"></span>e relatively far apart (\u20ac2.625 million and \u20ac4.635</span> </span></span>million respectively), mainly d<span class=\"_ _2\"></span>ue to differen<span class=\"ff42\">ces in <span class=\"_ _e\"></span>assumptions for<span class=\"_ _2\"></span> the terminal value, the expert\u2019s mid<span class=\"ff3f\">-poi<span class=\"_ _e\"></span>nt is based on 75% of </span></span>the median and 25<span class=\"_ _2\"></span>% of the average, bearing in mind, among other factors, that the median alone might not appropriately reflect the impa<span class=\"_ _2\"></span>ct of incentive remuneration on the t<span class=\"_ _e\"></span>erminal value (see above for more details)<span class=\"_ _2\"></span>. <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Due to<span class=\"_ _2\"></span> the increase in 2022 in the interest rates, the discount rate has increased significantly compared to last year. This <span class=\"_ _e\"></span>increase </span></span>has been fully ta<span class=\"_ _2\"></span>ken into account in the cost of equity wit<span class=\"_ _e\"></span>hout considering that it could be more linked to the maximu<span class=\"_ _e\"></span>m allowed return. Th<span class=\"_ _2\"></span>is approach results in conservative values. T<span class=\"_ _e\"></span>he valorisation is also impacted by the significant investments (and related cash outs) expected on the horizon of the plan (a<span class=\"_ _2\"></span>cceleration of the energy transition) whereas the returns on these investments will materialise<span class=\"_ _2\"></span> over a longer period. I<span class=\"_ _e\"></span>n this context, and all other things being equal, an increase of 1% of the cost of equity/ 50 basis point <span class=\"_ _2\"></span>in the WACC (market reference) would result i<span class=\"_ _e\"></span>n a 22% lower value<span class=\"_ _2\"></span> in use and a potential impairment loss of around \u20ac<span class=\"ff3f\">385.0<span class=\"_ _2\"></span> million. The evolution of market parameters is clos<span class=\"_ _e\"></span>ely monitored b<span class=\"_ _2\"></span>y the group <span class=\"_ _e\"></span>with the regulator in order to s<span class=\"_ _e\"></span>ecure the </span>realization<span class=\"_ _2\"></span> of the expected investments and allow ETB to <span class=\"_ _e\"></span>keep a strong<span class=\"_ _2\"></span> position in the market. A<span class=\"_ _e\"></span> decrease of 1% of the cost of equity/ 50 basis points in the d<span class=\"_ _2\"></span>iscount rates used would le<span class=\"_ _e\"></span>ad to an increase in the value of <span class=\"_ _2\"></span>the CGU of around \u20ac<span class=\"_ _e\"></span><span class=\"ff3f\">1,2<span class=\"_ _e\"></span>05.0 million<span class=\"_ _2\"></span>. </span>Acquisi<span class=\"_ _e\"></span>tion<span class=\"_ _2\"></span> of Eurogrid International \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In April 2<span class=\"_ _2\"></span>018, the acquisition of an extra 20% stake in Eurogrid International by the group <span class=\"ff42\">for \u20ac988.7</span> million resulted<span class=\"_ _e\"></span> in a goodwill </span></span>of \u20ac703.4<span class=\"ff3f\"> million, being the d<span class=\"_ _2\"></span>ifference between the ac<span class=\"_ _e\"></span>quisition value of this stake and the proportional carrying amount of its </span>assets. The goodwill re<span class=\"_ _2\"></span>sulting from the additional 20% sta<span class=\"_ _e\"></span>ke in Eurogrid In<span class=\"_ _2\"></span>ternational was allocated to the <span class=\"_ _e\"></span>CGU 50Hertz Transmission, sin<span class=\"_ _2\"></span>ce it comprises all income and ex<span class=\"_ _e\"></span>penses generated<span class=\"_ _2\"></span> thereof.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> impairment test was conducted by an independent expert. This impairment test is based on two main valuation methods: 1<span class=\"_ _e\"></span>) a </span></span>discounted cash flo<span class=\"_ _2\"></span>ws (DCF) method; a<span class=\"_ _e\"></span>nd 2) a dividend discount m<span class=\"_ _2\"></span>odel (DDM). Both <span class=\"_ _e\"></span>of these are further detached in valuation variants depending on the<span class=\"_ _2\"></span> terminal value calculation. Future cash flows and future dividends are based on a busi<span class=\"_ _e\"></span>ne<span class=\"_ _e\"></span>ss plan for the<span class=\"_ _2\"></span> period 2021-2031 (two regulatory periods). As the <span class=\"ff42\">group\u2019s </span>asset base consists of assets with long useful lives, the <span class=\"ff42\">b<span class=\"_ _e\"></span>usiness plan\u2019s</span> projection period was set to encompass the next two regulatory periods. The va<span class=\"_ _2\"></span>luation methods are subject to different assumptions, most importantly:<span class=\"_ _e\"></span> 1.<span class=\"ls0\"> <span class=\"_ _53\"></span><span class=\"ff3f fs11 fc3\">Discounting <span class=\"_ _e\"></span>of future<span class=\"_ _2\"></span> cash flows (DCF-m<span class=\"_ _e\"></span>odels): </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity: 8.3%; </span></span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Risk-fr<span class=\"_ _2\"></span>ee-rate: 2.2% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Beta<span class=\"_ _2\"></span> 0.93 </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Equity m<span class=\"_ _2\"></span>arket risk premium 5.5% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Cou<span class=\"_ _2\"></span>ntry risk premium 0.0% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Sma<span class=\"_ _2\"></span>ll firm premium 1.0% </span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Pre-tax Cost of Debt: 3.8%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Corporate tax rate: 30%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Target gearing (D/(D+E)): 60%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">WAC<span class=\"_ _e\"></span>C: 4.9%. </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on three variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a 1<span class=\"ls1d\">.1</span>3x RAB multiple in 2032; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a perpetual growth rate of 2.0<span class=\"ls24\">%.</span> </span></span>2.<span class=\"ls0\"> <span class=\"_ _57\"></span><span class=\"ff3f fs11 fc3\">D<span class=\"_ _e\"></span>iscounting of future dividends <span class=\"_ _e\"></span>(DDM-models): <span class=\"_ _2\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity: 8.3% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on two variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on 1.13x RAB multiple in 2032;<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a perpetual growth rate of 2.0%. </span></span>Conclusion: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Neither<span class=\"_ _2\"></span> the independent analysis, which was based on a <span class=\"ff42\">(<span class=\"_ _e\"></span>\u20ac2,602 million)</span> midpoint of the different valuation approaches and<span class=\"_ _2\"></span> </span></span>variants u<span class=\"_ _2\"></span>sed, nor the sensitivity analysis result<span class=\"ls5b\">ed</span> in<span class=\"_ _e\"></span> the identification of an impairment of goodwill in the financial year 2022<span class=\"ls1d\">. </span>Moreo<span class=\"_ _2\"></span>ver, market multiples (based on current enterprise values and current/forecasted EBITDA) were applied for plausibility.<span class=\"_ _20\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> median of the different methods presented above w<span class=\"ff42\">e<span class=\"_ _e\"></span>re rela<span class=\"_ _2\"></span>tively close (\u20ac2,602 million and \u20ac3,055 million respectively), as the </span></span></span>assumptions for<span class=\"_ _2\"></span> the terminal value were similar. Neither the independent analysis<span class=\"_ _e\"></span> based on a median of the different valuation approaches and variants used, nor the sensitivity analysis resulted in the identification of an impairment of goodwill in the financial year 2022. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Due to<span class=\"_ _2\"></span> the increase in 2022 in the interest rates, the discount rate has increased significantly compared to last year. This <span class=\"_ _e\"></span><span class=\"ls1c\">in</span>crease </span></span>has been fully ta<span class=\"_ _2\"></span>ken into account in the cost of equity wit<span class=\"_ _e\"></span>hout considering that it could be more linked to the maximu<span class=\"_ _e\"></span>m allowed return. Th<span class=\"_ _2\"></span>is approach results in conservative values. T<span class=\"_ _e\"></span>he valorisation is also impacted by the significant investments (and related cash outs) expected on the horizon of the plan (a<span class=\"_ _2\"></span>cceleration of the energy transition) whereas the returns on these investments will materialise<span class=\"_ _2\"></span> over a longer period. I<span class=\"_ _e\"></span>n this context, and all other things being equal, an increase of 1% of the cost of equity/ 50 basis point <span class=\"_ _2\"></span>in the WACC (market reference) would result i<span class=\"_ _e\"></span>n a <span class=\"ls5b\">19</span>% lower value in use, being a value slightly higher than the book value. A decrease<span class=\"_ _2\"></span> of 1% of the cost of equity/ 50 basis points in the discount rates used would lead to an increase i<span class=\"_ _e\"></span>n the value of the CGU of arou<span class=\"_ _2\"></span>nd \u20ac<span class=\"ff3f\">385.8 million.<span class=\"_ _e\"></span> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIntangibleAssetsAndGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__56": {
   "value": "During 2022, \u20ac0.6<span class=\"ff3f\"> m<span class=\"_ _2\"></span>illion in borrowing costs were capitalised on <span class=\"ff42\">software in development (compared with \u20ac0.3</span> <span class=\"_ _e\"></span>million in 2021) in the </span>Elia Transm<span class=\"_ _2\"></span>ission Belgium segment, based on an averag<span class=\"_ _e\"></span>e interest rate of 1.91% (1.92% in 2021<span class=\"ls8f\">).</span> No borrowing co<span class=\"_ _e\"></span>sts on software in development were ca<span class=\"_ _2\"></span>pitalised in the 50Hertz Transmission segment.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBorrowingCostsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__60": {
   "value": "6.3. <span class=\"_ _87\"> </span>Goodwill There were<span class=\"_ _2\"></span> no changes in goodwill during the years 2<span class=\"_ _e\"></span>021-2022. The carr<span class=\"_ _2\"></span>ying a<span class=\"_ _e\"></span>mount <span class=\"_ _2\"></span>is the following:<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Good<span class=\"_ _2\"></span>will<span class=\"_ _e\"></span> ACQUISITION VALUE Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 2,411.1 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 2,411.1 Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 2,411.1 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 2,411.1 The goodwill re<span class=\"_ _2\"></span>lates to the following business combinations and is allocated to the cash g<span class=\"_ _e\"></span>enerating unit (CGU) Elia Transmission for the acquisition o<span class=\"_ _2\"></span>f Elia Asset and Elia Engineering and to the CGU 50Hertz Transmission for the acquisition of the 20% stake <span class=\"_ _e\"></span>in Eurogrid Internationa<span class=\"_ _2\"></span>l: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>Acquisition Elia Asset <span class=\"ff42\">\u2013</span> 2002 1,700.1 Acquisition Elia Enginee<span class=\"_ _2\"></span>ring <span class=\"ff42\">\u2013</span> <span class=\"ls5b\">2004<span class=\"_ _e\"></span></span> 7.7 Acquisition Eurogrid In<span class=\"_ _2\"></span>ternational <span class=\"ff42\">\u2013</span> <span class=\"ls5b\">2018<span class=\"_ _e\"></span></span> 703.4 Total 2,411.1 IMPAIRMENT TEST FOR CASH-GENERATING UNITS CONTAINING GOODWILL According to<span class=\"_ _2\"></span> IFRS rules, goodwill should be tested for impairment <span class=\"ls5b\">on <span class=\"_ _e\"></span></span>at least an annual basis or upon the occurrence of a triggering event. Goodwill is alloca<span class=\"_ _2\"></span>ted to the CGUs Elia Transmission and 50Hertz Transmission for impairment te<span class=\"_ _2\"></span>sting. <span class=\"_ _e\"></span>Cas<span class=\"_ _e\"></span>h-generating units to which good<span class=\"_ _2\"></span>will has been allocated are tested for impairment at least annually. <span class=\"_ _e\"></span> The recoverable amou<span class=\"_ _2\"></span>nt of CGUs is determined by reference to a value in use that is calculated b<span class=\"_ _e\"></span>ased on different metho<span class=\"_ _2\"></span>ds (Discounted Cash F<span class=\"_ _2\"></span>low and Discounted Dividend Model) <span class=\"_ _e\"></span>using <span class=\"ff40\">cash flow projections</span> drawn up on the basis of the 2022 reforecast and the 2023-2027 bu<span class=\"_ _2\"></span>siness plan, as approved by the Ma<span class=\"_ _e\"></span>nagement Committee and the Board of Directors, and on extrapolated cash flows beyond that time frame<span class=\"_ _2\"></span>. <span class=\"_ _e\"></span><span class=\"ff40 fc1d\"> </span>The forecast<span class=\"_ _2\"></span>s and projections included in the reference scenario were determined on the basis of the estimated investment pla<span class=\"_ _e\"></span>ns, remuneration de<span class=\"_ _2\"></span>fined in the regulatory frameworks, market<span class=\"_ _e\"></span> evolution, market share and margin evolution<span class=\"ls1d\">. </span>As the <span class=\"ff42\">g<span class=\"_ _e\"></span>roup\u2019s </span>asset base consists of a<span class=\"_ _2\"></span>ssets with long useful liv<span class=\"_ _e\"></span>es, the <span class=\"ff42\">business plan\u2019s</span> projection period was set to encompass the coming two regulatory periods.<span class=\"_ _e\"></span> The <span class=\"ff40\">discount rate<span class=\"_ _2\"></span>s<span class=\"ff3f\"> used correspond to the weighted ave<span class=\"_ _e\"></span>rage cost of capital, which is adjusted in order to reflect the business, market, </span></span>country and currency risk relating<span class=\"_ _2\"></span> to each goodwill CGU r<span class=\"_ _e\"></span>eviewed. The d<span class=\"_ _2\"></span>iscount rates used are consistent with avail<span class=\"_ _e\"></span>abl<span class=\"_ _e\"></span>e external informa<span class=\"_ _2\"></span>tion sources.<span class=\"_ _e\"></span> The <span class=\"ff40\">g<span class=\"_ _2\"></span>rowth rates<span class=\"ff3f\"> associated with the terminal values <span class=\"ls5b\">do</span> <span class=\"_ _e\"></span>not exceed the inflation rate or the long-term average growth rate for the </span></span>market <span class=\"_ _2\"></span>to which the CGU is dedicated.<span class=\"_ _e\"></span> More details are p<span class=\"_ _2\"></span>rovided below by CGU.<span class=\"_ _e\"></span> Acquisi<span class=\"_ _e\"></span>tion<span class=\"_ _2\"></span> of Elia Asset and Elia Engineering In 2002, the<span class=\"_ _2\"></span> acquisition of Elia Asset by the Company for <span class=\"_ _e\"></span><span class=\"ff42\">\u20ac3,304.1</span> million resulted in a positive consolidation difference of \u20ac1,700<span class=\"_ _2\"></span>.1<span class=\"ff3f\"> million. This positive consolidation difference was the result of the difference between the acquisition value of th<span class=\"_ _2\"></span>is entity<span class=\"_ _e\"></span> an<span class=\"_ _e\"></span>d </span>the carrying amount of its<span class=\"_ _2\"></span> assets. This difference consists<span class=\"_ _e\"></span> of various aspect<span class=\"_ _2\"></span>s such as the fact that (i) Elia was appointed as a TSO for a period of 20<span class=\"_ _2\"></span> years (ii) Elia had unique resources in Belgium as <span class=\"ls1c\">it</span> owns the whole of ex<span class=\"_ _e\"></span>tra-high-voltage grid and owns 94% of the high-voltage grid (<span class=\"_ _2\"></span>or has the right to use this), and hence only Eli<span class=\"_ _e\"></span>a is entitled<span class=\"_ _2\"></span> to put forward a development plan and (iii) Elia had the relevant TSO know-how. At the date of a<span class=\"_ _2\"></span>cquisition, the description or the quantification in euros of these aspects could not be performed on an objective<span class=\"_ _e\"></span>, transparent and reliab<span class=\"_ _2\"></span>le basis and, the difference could not therefore be allocated to specific assets and was consi<span class=\"_ _e\"></span>dered unallocated. This difference<span class=\"_ _2\"></span> has consequently been recognised as goo<span class=\"_ _e\"></span>dwill since the initia<span class=\"_ _2\"></span>l adoption of IFRS in 2005. The regulatory <span class=\"_ _e\"></span>framework, in particular the<span class=\"_ _2\"></span> offsetting in the tariffs of the decommissioning of fixed assets, applicable from 2008 onwards, did not have an i<span class=\"_ _e\"></span>mpact on this accoun<span class=\"_ _2\"></span>ting treatment. The goodwill described above and the goodwill resulting from the acquisition<span class=\"_ _2\"></span> o<span class=\"_ _e\"></span>f Eli<span class=\"_ _e\"></span>a Engineering in 2004 were allocated to the<span class=\"_ _2\"></span> single cash-generating unit for the impairment test determined, since the income and expenses we<span class=\"_ _e\"></span>re generated by one activity, specifically 're<span class=\"_ _2\"></span>gulated activity in Belgium', which will also be considered one CGU.<span class=\"_ _e\"></span> As a result, the group assigned the carrying amount of the goodwill to<span class=\"_ _2\"></span> one unit, n<span class=\"_ _e\"></span>amely the regulated activity in Belgium. Since 2004, annual impairment <span class=\"_ _2\"></span>tests have been conducted and have not resulted in the r<span class=\"_ _e\"></span>ecognition of any impairment losses. The impairment te<span class=\"_ _2\"></span>st was conducted by an independent expert. This imp<span class=\"_ _e\"></span>airment test is based on the value in use and uses two main valuation methods to e<span class=\"_ _2\"></span>stimate the recoverable amount: 1<span class=\"_ _e\"></span>) a discounted cash flows method (DCF); and 2) a dividend discount model (DDM), b<span class=\"_ _2\"></span>oth of which are further detached in valuation variants de<span class=\"_ _e\"></span>pending on the terminal value calculation. Future cash f<span class=\"_ _2\"></span>lows and future dividends a<span class=\"_ _e\"></span>re based on a business plan for t<span class=\"_ _2\"></span>he period 2022-<span class=\"_ _e\"></span>2032. As the <span class=\"ff42\">group\u2019s </span>asset base consists of assets with long useful lives, the <span class=\"ff42\">business plan\u2019s</span> projection period was set to encompass the coming two regulatory periods. Note that the regulatory framewor<span class=\"_ _2\"></span>k within which Elia operates is characteris<span class=\"_ _e\"></span>ed by an allowed revenues basis structured around: 1) a fair remuneration of <span class=\"_ _2\"></span>the regulat<span class=\"ls5b\">ed</span> asse<span class=\"_ _e\"></span>t base; <span class=\"ls5b\">and <span class=\"_ _e\"></span></span>2) incentives to guarantee the continuity of supply and improve efficiency. Considering that the regulator will allow a f<span class=\"_ _2\"></span>air remuneration of the regul<span class=\"_ _e\"></span>at<span class=\"ls5b\">ed</span> asset base consistent with market expectations, the <span class=\"_ _e\"></span>estimated regulat<span class=\"ls5b\">ed</span> asset base for the last forecast year can be considered an indication of the terminal va<span class=\"_ _2\"></span>lue. T<span class=\"_ _e\"></span>his approach does not take into account potentia<span class=\"_ _2\"></span>l cash flows gene<span class=\"_ _e\"></span>rated by meeting or beating future efficiency targets. The va<span class=\"_ _2\"></span>luation methods are subject to different assumptions<span class=\"_ _e\"></span>, the most important of which are outlined below. 1.<span class=\"ls0\"> <span class=\"_ _53\"></span><span class=\"ff3f fs11 fc3\">Discounting <span class=\"_ _e\"></span>of future<span class=\"_ _2\"></span> cash flows (DCF-m<span class=\"_ _e\"></span>odels): </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity of 9.3%; </span></span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Risk-fr<span class=\"_ _2\"></span>ee-rate: 2.2% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Beta<span class=\"_ _2\"></span> 0.93 </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Equity m<span class=\"_ _2\"></span>arket risk premium 5.5% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Cou<span class=\"_ _2\"></span>ntry risk premium 1.0% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Sma<span class=\"_ _2\"></span>ll firm premium 1.0% </span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Pre-tax Cost of Debt of 3.8%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Corporate tax rate of 25%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Target gearing (D/(D+E)): 60%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Post-tax WACC: 5.4%. </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on two variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a 1.13x RAB multiple in 2032  </span></span>NB: as such, the RAB itself does not take into account the contribution that the incentive remuneration makes to the value creation<span class=\"_ _2\"></span> process.<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal <span class=\"_ _20\"></span>value <span class=\"_ _20\"></span>based <span class=\"_ _e\"></span>on<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>a <span class=\"_ _20\"></span>perpetual <span class=\"_ _e\"></span>g<span class=\"_ _e\"></span>rowth <span class=\"_ _20\"></span>rate <span class=\"_ _20\"></span>of <span class=\"_ _e\"></span>3.<span class=\"_ _e\"></span>3<span class=\"_ _e\"></span>%. <span class=\"_ _20\"></span>This <span class=\"_ _20\"></span>long<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>term <span class=\"_ _20\"></span>growth <span class=\"_ _20\"></span>rate <span class=\"_ _e\"></span>is <span class=\"_ _20\"></span>hi<span class=\"_ _e\"></span>gher <span class=\"_ _20\"></span>than <span class=\"_ _20\"></span>long<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>term <span class=\"_ _20\"></span>expected </span></span>inflation to<span class=\"_ _2\"></span> capture the returns generated from the si<span class=\"_ _e\"></span>gnificant investments in the business plan. 2.<span class=\"ls0\"> <span class=\"_ _53\"></span><span class=\"ff3f fs11 fc3\">Discounting <span class=\"_ _e\"></span>of future<span class=\"_ _2\"></span> dividends <span class=\"_ _e\"></span>(DDM-models):  </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity of 9.3% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on two variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on 1.13x RAB multiple in 2032<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> </span></span>NB: as such, th<span class=\"_ _2\"></span>e RAB<span class=\"_ _e\"></span> itself does <span class=\"_ _2\"></span>not take into account <span class=\"_ _e\"></span>the contribution of the incentive remuneration to the value creation process. o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a perpetual growth rate of 3.3<span class=\"_ _e\"></span><span class=\"ls24\">%.</span> Th<span class=\"_ _2\"></span>is approach assumes that the residual value consists <span class=\"_ _e\"></span>of profit </span></span>after tax less invest<span class=\"_ _e\"></span>ments and considers <span class=\"_ _e\"></span>net borrowings (i<span class=\"_ _e\"></span>n relation to th<span class=\"_ _e\"></span>e investments). <span class=\"_ _e\"></span>Howeve<span class=\"_ _e\"></span>r, profit <span class=\"_ _e\"></span>and thus di<span class=\"_ _e\"></span>vidend<span class=\"_ _e\"></span> paymen<span class=\"_ _2\"></span>ts in FY32 most likely does not yet reflect the (po<span class=\"_ _e\"></span>sitive) impact of the investments planned in FY26-FY32.<span class=\"_ _e\"></span> Conclusion: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> independent analysis, which was based on a <span class=\"ff42\">(\u20ac3,127 million)</span> midpoint of the different valuation approaches and variants </span></span>used did not result in<span class=\"_ _2\"></span> the identification of an<span class=\"_ _e\"></span> impairment of goodwill in the financial year 2022. Moreover, market multiples (based on current <span class=\"_ _2\"></span>enterprise values and current/forecasted EBITDA) were applied for plausibility.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">As the m<span class=\"_ _2\"></span>edian and the average of the different methods presented above w<span class=\"ff42\">er<span class=\"_ _e\"></span>e relatively far apart (\u20ac2.625 million and \u20ac4.635</span> </span></span>million respectively), mainly d<span class=\"_ _2\"></span>ue to differen<span class=\"ff42\">ces in <span class=\"_ _e\"></span>assumptions for<span class=\"_ _2\"></span> the terminal value, the expert\u2019s mid<span class=\"ff3f\">-poi<span class=\"_ _e\"></span>nt is based on 75% of </span></span>the median and 25<span class=\"_ _2\"></span>% of the average, bearing in mind, among other factors, that the median alone might not appropriately reflect the impa<span class=\"_ _2\"></span>ct of incentive remuneration on the t<span class=\"_ _e\"></span>erminal value (see above for more details)<span class=\"_ _2\"></span>. <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Due to<span class=\"_ _2\"></span> the increase in 2022 in the interest rates, the discount rate has increased significantly compared to last year. This <span class=\"_ _e\"></span>increase </span></span>has been fully ta<span class=\"_ _2\"></span>ken into account in the cost of equity wit<span class=\"_ _e\"></span>hout considering that it could be more linked to the maximu<span class=\"_ _e\"></span>m allowed return. Th<span class=\"_ _2\"></span>is approach results in conservative values. T<span class=\"_ _e\"></span>he valorisation is also impacted by the significant investments (and related cash outs) expected on the horizon of the plan (a<span class=\"_ _2\"></span>cceleration of the energy transition) whereas the returns on these investments will materialise<span class=\"_ _2\"></span> over a longer period. I<span class=\"_ _e\"></span>n this context, and all other things being equal, an increase of 1% of the cost of equity/ 50 basis point <span class=\"_ _2\"></span>in the WACC (market reference) would result i<span class=\"_ _e\"></span>n a 22% lower value<span class=\"_ _2\"></span> in use and a potential impairment loss of around \u20ac<span class=\"ff3f\">385.0<span class=\"_ _2\"></span> million. The evolution of market parameters is clos<span class=\"_ _e\"></span>ely monitored b<span class=\"_ _2\"></span>y the group <span class=\"_ _e\"></span>with the regulator in order to s<span class=\"_ _e\"></span>ecure the </span>realization<span class=\"_ _2\"></span> of the expected investments and allow ETB to <span class=\"_ _e\"></span>keep a strong<span class=\"_ _2\"></span> position in the market. A<span class=\"_ _e\"></span> decrease of 1% of the cost of equity/ 50 basis points in the d<span class=\"_ _2\"></span>iscount rates used would le<span class=\"_ _e\"></span>ad to an increase in the value of <span class=\"_ _2\"></span>the CGU of around \u20ac<span class=\"_ _e\"></span><span class=\"ff3f\">1,2<span class=\"_ _e\"></span>05.0 million<span class=\"_ _2\"></span>. </span>Acquisi<span class=\"_ _e\"></span>tion<span class=\"_ _2\"></span> of Eurogrid International \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In April 2<span class=\"_ _2\"></span>018, the acquisition of an extra 20% stake in Eurogrid International by the group <span class=\"ff42\">for \u20ac988.7</span> million resulted<span class=\"_ _e\"></span> in a goodwill </span></span>of \u20ac703.4<span class=\"ff3f\"> million, being the d<span class=\"_ _2\"></span>ifference between the ac<span class=\"_ _e\"></span>quisition value of this stake and the proportional carrying amount of its </span>assets. The goodwill re<span class=\"_ _2\"></span>sulting from the additional 20% sta<span class=\"_ _e\"></span>ke in Eurogrid In<span class=\"_ _2\"></span>ternational was allocated to the <span class=\"_ _e\"></span>CGU 50Hertz Transmission, sin<span class=\"_ _2\"></span>ce it comprises all income and ex<span class=\"_ _e\"></span>penses generated<span class=\"_ _2\"></span> thereof.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> impairment test was conducted by an independent expert. This impairment test is based on two main valuation methods: 1<span class=\"_ _e\"></span>) a </span></span>discounted cash flo<span class=\"_ _2\"></span>ws (DCF) method; a<span class=\"_ _e\"></span>nd 2) a dividend discount m<span class=\"_ _2\"></span>odel (DDM). Both <span class=\"_ _e\"></span>of these are further detached in valuation variants depending on the<span class=\"_ _2\"></span> terminal value calculation. Future cash flows and future dividends are based on a busi<span class=\"_ _e\"></span>ne<span class=\"_ _e\"></span>ss plan for the<span class=\"_ _2\"></span> period 2021-2031 (two regulatory periods). As the <span class=\"ff42\">group\u2019s </span>asset base consists of assets with long useful lives, the <span class=\"ff42\">b<span class=\"_ _e\"></span>usiness plan\u2019s</span> projection period was set to encompass the next two regulatory periods. The va<span class=\"_ _2\"></span>luation methods are subject to different assumptions, most importantly:<span class=\"_ _e\"></span> 1.<span class=\"ls0\"> <span class=\"_ _53\"></span><span class=\"ff3f fs11 fc3\">Discounting <span class=\"_ _e\"></span>of future<span class=\"_ _2\"></span> cash flows (DCF-m<span class=\"_ _e\"></span>odels): </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity: 8.3%; </span></span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Risk-fr<span class=\"_ _2\"></span>ee-rate: 2.2% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Beta<span class=\"_ _2\"></span> 0.93 </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Equity m<span class=\"_ _2\"></span>arket risk premium 5.5% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Cou<span class=\"_ _2\"></span>ntry risk premium 0.0% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Sma<span class=\"_ _2\"></span>ll firm premium 1.0% </span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Pre-tax Cost of Debt: 3.8%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Corporate tax rate: 30%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Target gearing (D/(D+E)): 60%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">WAC<span class=\"_ _e\"></span>C: 4.9%. </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on three variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a 1<span class=\"ls1d\">.1</span>3x RAB multiple in 2032; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a perpetual growth rate of 2.0<span class=\"ls24\">%.</span> </span></span>2.<span class=\"ls0\"> <span class=\"_ _57\"></span><span class=\"ff3f fs11 fc3\">D<span class=\"_ _e\"></span>iscounting of future dividends <span class=\"_ _e\"></span>(DDM-models): <span class=\"_ _2\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity: 8.3% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on two variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on 1.13x RAB multiple in 2032;<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a perpetual growth rate of 2.0%. </span></span>Conclusion: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Neither<span class=\"_ _2\"></span> the independent analysis, which was based on a <span class=\"ff42\">(<span class=\"_ _e\"></span>\u20ac2,602 million)</span> midpoint of the different valuation approaches and<span class=\"_ _2\"></span> </span></span>variants u<span class=\"_ _2\"></span>sed, nor the sensitivity analysis result<span class=\"ls5b\">ed</span> in<span class=\"_ _e\"></span> the identification of an impairment of goodwill in the financial year 2022<span class=\"ls1d\">. </span>Moreo<span class=\"_ _2\"></span>ver, market multiples (based on current enterprise values and current/forecasted EBITDA) were applied for plausibility.<span class=\"_ _20\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> median of the different methods presented above w<span class=\"ff42\">e<span class=\"_ _e\"></span>re rela<span class=\"_ _2\"></span>tively close (\u20ac2,602 million and \u20ac3,055 million respectively), as the </span></span></span>assumptions for<span class=\"_ _2\"></span> the terminal value were similar. Neither the independent analysis<span class=\"_ _e\"></span> based on a median of the different valuation approaches and variants used, nor the sensitivity analysis resulted in the identification of an impairment of goodwill in the financial year 2022. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Due to<span class=\"_ _2\"></span> the increase in 2022 in the interest rates, the discount rate has increased significantly compared to last year. This <span class=\"_ _e\"></span><span class=\"ls1c\">in</span>crease </span></span>has been fully ta<span class=\"_ _2\"></span>ken into account in the cost of equity wit<span class=\"_ _e\"></span>hout considering that it could be more linked to the maximu<span class=\"_ _e\"></span>m allowed return. Th<span class=\"_ _2\"></span>is approach results in conservative values. T<span class=\"_ _e\"></span>he valorisation is also impacted by the significant investments (and related cash outs) expected on the horizon of the plan (a<span class=\"_ _2\"></span>cceleration of the energy transition) whereas the returns on these investments will materialise<span class=\"_ _2\"></span> over a longer period. I<span class=\"_ _e\"></span>n this context, and all other things being equal, an increase of 1% of the cost of equity/ 50 basis point <span class=\"_ _2\"></span>in the WACC (market reference) would result i<span class=\"_ _e\"></span>n a <span class=\"ls5b\">19</span>% lower value in use, being a value slightly higher than the book value. A decrease<span class=\"_ _2\"></span> of 1% of the cost of equity/ 50 basis points in the discount rates used would lead to an increase i<span class=\"_ _e\"></span>n the value of the CGU of arou<span class=\"_ _2\"></span>nd \u20ac<span class=\"ff3f\">385.8 million.<span class=\"_ _e\"></span> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGoodwillExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__63-1": {
   "value": "The goodwill re<span class=\"_ _2\"></span>lates to the following business combinations and is allocated to the cash g<span class=\"_ _e\"></span>enerating unit (CGU) Elia Transmission for the acquisition o<span class=\"_ _2\"></span>f Elia Asset and Elia Engineering and to the CGU 50Hertz Transmission for the acquisition of the 20% stake <span class=\"_ _e\"></span>in Eurogrid Internationa<span class=\"_ _2\"></span>l: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>Acquisition Elia Asset <span class=\"ff42\">\u2013</span> 2002 1,700.1 Acquisition Elia Enginee<span class=\"_ _2\"></span>ring <span class=\"ff42\">\u2013</span> <span class=\"ls5b\">2004<span class=\"_ _e\"></span></span> 7.7 Acquisition Eurogrid In<span class=\"_ _2\"></span>ternational <span class=\"ff42\">\u2013</span> <span class=\"ls5b\">2018<span class=\"_ _e\"></span></span> 703.4 Total 2,411.1IMPAIRMENT TEST FOR CASH-GENERATING UNITS CONTAINING GOODWILL According to<span class=\"_ _2\"></span> IFRS rules, goodwill should be tested for impairment <span class=\"ls5b\">on <span class=\"_ _e\"></span></span>at least an annual basis or upon the occurrence of a triggering event. Goodwill is alloca<span class=\"_ _2\"></span>ted to the CGUs Elia Transmission and 50Hertz Transmission for impairment te<span class=\"_ _2\"></span>sting. <span class=\"_ _e\"></span>Cas<span class=\"_ _e\"></span>h-generating units to which good<span class=\"_ _2\"></span>will has been allocated are tested for impairment at least annually. <span class=\"_ _e\"></span> The recoverable amou<span class=\"_ _2\"></span>nt of CGUs is determined by reference to a value in use that is calculated b<span class=\"_ _e\"></span>ased on different metho<span class=\"_ _2\"></span>ds (Discounted Cash F<span class=\"_ _2\"></span>low and Discounted Dividend Model) <span class=\"_ _e\"></span>using <span class=\"ff40\">cash flow projections</span> drawn up on the basis of the 2022 reforecast and the 2023-2027 bu<span class=\"_ _2\"></span>siness plan, as approved by the Ma<span class=\"_ _e\"></span>nagement Committee and the Board of Directors, and on extrapolated cash flows beyond that time frame<span class=\"_ _2\"></span>. <span class=\"_ _e\"></span><span class=\"ff40 fc1d\"> </span>The forecast<span class=\"_ _2\"></span>s and projections included in the reference scenario were determined on the basis of the estimated investment pla<span class=\"_ _e\"></span>ns, remuneration de<span class=\"_ _2\"></span>fined in the regulatory frameworks, market<span class=\"_ _e\"></span> evolution, market share and margin evolution<span class=\"ls1d\">. </span>As the <span class=\"ff42\">g<span class=\"_ _e\"></span>roup\u2019s </span>asset base consists of a<span class=\"_ _2\"></span>ssets with long useful liv<span class=\"_ _e\"></span>es, the <span class=\"ff42\">business plan\u2019s</span> projection period was set to encompass the coming two regulatory periods.<span class=\"_ _e\"></span> The <span class=\"ff40\">discount rate<span class=\"_ _2\"></span>s<span class=\"ff3f\"> used correspond to the weighted ave<span class=\"_ _e\"></span>rage cost of capital, which is adjusted in order to reflect the business, market, </span></span>country and currency risk relating<span class=\"_ _2\"></span> to each goodwill CGU r<span class=\"_ _e\"></span>eviewed. The d<span class=\"_ _2\"></span>iscount rates used are consistent with avail<span class=\"_ _e\"></span>abl<span class=\"_ _e\"></span>e external informa<span class=\"_ _2\"></span>tion sources.<span class=\"_ _e\"></span> The <span class=\"ff40\">g<span class=\"_ _2\"></span>rowth rates<span class=\"ff3f\"> associated with the terminal values <span class=\"ls5b\">do</span> <span class=\"_ _e\"></span>not exceed the inflation rate or the long-term average growth rate for the </span></span>market <span class=\"_ _2\"></span>to which the CGU is dedicated.<span class=\"_ _e\"></span> More details are p<span class=\"_ _2\"></span>rovided below by CGU.<span class=\"_ _e\"></span> Acquisi<span class=\"_ _e\"></span>tion<span class=\"_ _2\"></span> of Elia Asset and Elia Engineering In 2002, the<span class=\"_ _2\"></span> acquisition of Elia Asset by the Company for <span class=\"_ _e\"></span><span class=\"ff42\">\u20ac3,304.1</span> million resulted in a positive consolidation difference of \u20ac1,700<span class=\"_ _2\"></span>.1<span class=\"ff3f\"> million. This positive consolidation difference was the result of the difference between the acquisition value of th<span class=\"_ _2\"></span>is entity<span class=\"_ _e\"></span> an<span class=\"_ _e\"></span>d </span>the carrying amount of its<span class=\"_ _2\"></span> assets. This difference consists<span class=\"_ _e\"></span> of various aspect<span class=\"_ _2\"></span>s such as the fact that (i) Elia was appointed as a TSO for a period of 20<span class=\"_ _2\"></span> years (ii) Elia had unique resources in Belgium as <span class=\"ls1c\">it</span> owns the whole of ex<span class=\"_ _e\"></span>tra-high-voltage grid and owns 94% of the high-voltage grid (<span class=\"_ _2\"></span>or has the right to use this), and hence only Eli<span class=\"_ _e\"></span>a is entitled<span class=\"_ _2\"></span> to put forward a development plan and (iii) Elia had the relevant TSO know-how.Acquisi<span class=\"_ _e\"></span>tion<span class=\"_ _2\"></span> of Eurogrid International \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In April 2<span class=\"_ _2\"></span>018, the acquisition of an extra 20% stake in Eurogrid International by the group <span class=\"ff42\">for \u20ac988.7</span> million resulted<span class=\"_ _e\"></span> in a goodwill </span></span>of \u20ac703.4<span class=\"ff3f\"> million, being the d<span class=\"_ _2\"></span>ifference between the ac<span class=\"_ _e\"></span>quisition value of this stake and the proportional carrying amount of its </span>assets. The goodwill re<span class=\"_ _2\"></span>sulting from the additional 20% sta<span class=\"_ _e\"></span>ke in Eurogrid In<span class=\"_ _2\"></span>ternational was allocated to the <span class=\"_ _e\"></span>CGU 50Hertz Transmission, sin<span class=\"_ _2\"></span>ce it comprises all income and ex<span class=\"_ _e\"></span>penses generated<span class=\"_ _2\"></span> thereof.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBusinessCombinationsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__61-1": {
   "value": "IMPAIRMENT TEST FOR CASH-GENERATING UNITS CONTAINING GOODWILL According to<span class=\"_ _2\"></span> IFRS rules, goodwill should be tested for impairment <span class=\"ls5b\">on <span class=\"_ _e\"></span></span>at least an annual basis or upon the occurrence of a triggering event. Goodwill is alloca<span class=\"_ _2\"></span>ted to the CGUs Elia Transmission and 50Hertz Transmission for impairment te<span class=\"_ _2\"></span>sting. <span class=\"_ _e\"></span>Cas<span class=\"_ _e\"></span>h-generating units to which good<span class=\"_ _2\"></span>will has been allocated are tested for impairment at least annually. <span class=\"_ _e\"></span> The recoverable amou<span class=\"_ _2\"></span>nt of CGUs is determined by reference to a value in use that is calculated b<span class=\"_ _e\"></span>ased on different metho<span class=\"_ _2\"></span>ds (Discounted Cash F<span class=\"_ _2\"></span>low and Discounted Dividend Model) <span class=\"_ _e\"></span>using <span class=\"ff40\">cash flow projections</span> drawn up on the basis of the 2022 reforecast and the 2023-2027 bu<span class=\"_ _2\"></span>siness plan, as approved by the Ma<span class=\"_ _e\"></span>nagement Committee and the Board of Directors, and on extrapolated cash flows beyond that time frame<span class=\"_ _2\"></span>. <span class=\"_ _e\"></span><span class=\"ff40 fc1d\"> </span>The forecast<span class=\"_ _2\"></span>s and projections included in the reference scenario were determined on the basis of the estimated investment pla<span class=\"_ _e\"></span>ns, remuneration de<span class=\"_ _2\"></span>fined in the regulatory frameworks, market<span class=\"_ _e\"></span> evolution, market share and margin evolution<span class=\"ls1d\">. </span>As the <span class=\"ff42\">g<span class=\"_ _e\"></span>roup\u2019s </span>asset base consists of a<span class=\"_ _2\"></span>ssets with long useful liv<span class=\"_ _e\"></span>es, the <span class=\"ff42\">business plan\u2019s</span> projection period was set to encompass the coming two regulatory periods.<span class=\"_ _e\"></span> The <span class=\"ff40\">discount rate<span class=\"_ _2\"></span>s<span class=\"ff3f\"> used correspond to the weighted ave<span class=\"_ _e\"></span>rage cost of capital, which is adjusted in order to reflect the business, market, </span></span>country and currency risk relating<span class=\"_ _2\"></span> to each goodwill CGU r<span class=\"_ _e\"></span>eviewed. The d<span class=\"_ _2\"></span>iscount rates used are consistent with avail<span class=\"_ _e\"></span>abl<span class=\"_ _e\"></span>e external informa<span class=\"_ _2\"></span>tion sources.<span class=\"_ _e\"></span> The <span class=\"ff40\">g<span class=\"_ _2\"></span>rowth rates<span class=\"ff3f\"> associated with the terminal values <span class=\"ls5b\">do</span> <span class=\"_ _e\"></span>not exceed the inflation rate or the long-term average growth rate for the </span></span>market <span class=\"_ _2\"></span>to which the CGU is dedicated.<span class=\"_ _e\"></span> More details are p<span class=\"_ _2\"></span>rovided below by CGU.<span class=\"_ _e\"></span> Acquisi<span class=\"_ _e\"></span>tion<span class=\"_ _2\"></span> of Elia Asset and Elia Engineering In 2002, the<span class=\"_ _2\"></span> acquisition of Elia Asset by the Company for <span class=\"_ _e\"></span><span class=\"ff42\">\u20ac3,304.1</span> million resulted in a positive consolidation difference of \u20ac1,700<span class=\"_ _2\"></span>.1<span class=\"ff3f\"> million. This positive consolidation difference was the result of the difference between the acquisition value of th<span class=\"_ _2\"></span>is entity<span class=\"_ _e\"></span> an<span class=\"_ _e\"></span>d </span>the carrying amount of its<span class=\"_ _2\"></span> assets. This difference consists<span class=\"_ _e\"></span> of various aspect<span class=\"_ _2\"></span>s such as the fact that (i) Elia was appointed as a TSO for a period of 20<span class=\"_ _2\"></span> years (ii) Elia had unique resources in Belgium as <span class=\"ls1c\">it</span> owns the whole of ex<span class=\"_ _e\"></span>tra-high-voltage grid and owns 94% of the high-voltage grid (<span class=\"_ _2\"></span>or has the right to use this), and hence only Eli<span class=\"_ _e\"></span>a is entitled<span class=\"_ _2\"></span> to put forward a development plan and (iii) Elia had the relevant TSO know-how. At the date of a<span class=\"_ _2\"></span>cquisition, the description or the quantification in euros of these aspects could not be performed on an objective<span class=\"_ _e\"></span>, transparent and reliab<span class=\"_ _2\"></span>le basis and, the difference could not therefore be allocated to specific assets and was consi<span class=\"_ _e\"></span>dered unallocated. This difference<span class=\"_ _2\"></span> has consequently been recognised as goo<span class=\"_ _e\"></span>dwill since the initia<span class=\"_ _2\"></span>l adoption of IFRS in 2005. The regulatory <span class=\"_ _e\"></span>framework, in particular the<span class=\"_ _2\"></span> offsetting in the tariffs of the decommissioning of fixed assets, applicable from 2008 onwards, did not have an i<span class=\"_ _e\"></span>mpact on this accoun<span class=\"_ _2\"></span>ting treatment. The goodwill described above and the goodwill resulting from the acquisition<span class=\"_ _2\"></span> o<span class=\"_ _e\"></span>f Eli<span class=\"_ _e\"></span>a Engineering in 2004 were allocated to the<span class=\"_ _2\"></span> single cash-generating unit for the impairment test determined, since the income and expenses we<span class=\"_ _e\"></span>re generated by one activity, specifically 're<span class=\"_ _2\"></span>gulated activity in Belgium', which will also be considered one CGU.<span class=\"_ _e\"></span> As a result, the group assigned the carrying amount of the goodwill to<span class=\"_ _2\"></span> one unit, n<span class=\"_ _e\"></span>amely the regulated activity in Belgium. Since 2004, annual impairment <span class=\"_ _2\"></span>tests have been conducted and have not resulted in the r<span class=\"_ _e\"></span>ecognition of any impairment losses. The impairment te<span class=\"_ _2\"></span>st was conducted by an independent expert. This imp<span class=\"_ _e\"></span>airment test is based on the value in use and uses two main valuation methods to e<span class=\"_ _2\"></span>stimate the recoverable amount: 1<span class=\"_ _e\"></span>) a discounted cash flows method (DCF); and 2) a dividend discount model (DDM), b<span class=\"_ _2\"></span>oth of which are further detached in valuation variants de<span class=\"_ _e\"></span>pending on the terminal value calculation. Future cash f<span class=\"_ _2\"></span>lows and future dividends a<span class=\"_ _e\"></span>re based on a business plan for t<span class=\"_ _2\"></span>he period 2022-<span class=\"_ _e\"></span>2032. As the <span class=\"ff42\">group\u2019s </span>asset base consists of assets with long useful lives, the <span class=\"ff42\">business plan\u2019s</span> projection period was set to encompass the coming two regulatory periods. Note that the regulatory framewor<span class=\"_ _2\"></span>k within which Elia operates is characteris<span class=\"_ _e\"></span>ed by an allowed revenues basis structured around: 1) a fair remuneration of <span class=\"_ _2\"></span>the regulat<span class=\"ls5b\">ed</span> asse<span class=\"_ _e\"></span>t base; <span class=\"ls5b\">and <span class=\"_ _e\"></span></span>2) incentives to guarantee the continuity of supply and improve efficiency. Considering that the regulator will allow a f<span class=\"_ _2\"></span>air remuneration of the regul<span class=\"_ _e\"></span>at<span class=\"ls5b\">ed</span> asset base consistent with market expectations, the <span class=\"_ _e\"></span>estimated regulat<span class=\"ls5b\">ed</span> asset base for the last forecast year can be considered an indication of the terminal va<span class=\"_ _2\"></span>lue. T<span class=\"_ _e\"></span>his approach does not take into account potentia<span class=\"_ _2\"></span>l cash flows gene<span class=\"_ _e\"></span>rated by meeting or beating future efficiency targets. The va<span class=\"_ _2\"></span>luation methods are subject to different assumptions<span class=\"_ _e\"></span>, the most important of which are outlined below. 1.<span class=\"ls0\"> <span class=\"_ _53\"></span><span class=\"ff3f fs11 fc3\">Discounting <span class=\"_ _e\"></span>of future<span class=\"_ _2\"></span> cash flows (DCF-m<span class=\"_ _e\"></span>odels): </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity of 9.3%; </span></span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Risk-fr<span class=\"_ _2\"></span>ee-rate: 2.2% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Beta<span class=\"_ _2\"></span> 0.93 </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Equity m<span class=\"_ _2\"></span>arket risk premium 5.5% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Cou<span class=\"_ _2\"></span>ntry risk premium 1.0% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Sma<span class=\"_ _2\"></span>ll firm premium 1.0% </span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Pre-tax Cost of Debt of 3.8%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Corporate tax rate of 25%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Target gearing (D/(D+E)): 60%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Post-tax WACC: 5.4%. </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on two variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a 1.13x RAB multiple in 2032  </span></span>NB: as such, the RAB itself does not take into account the contribution that the incentive remuneration makes to the value creation<span class=\"_ _2\"></span> process.<span class=\"_ _e\"></span> o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal <span class=\"_ _20\"></span>value <span class=\"_ _20\"></span>based <span class=\"_ _e\"></span>on<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>a <span class=\"_ _20\"></span>perpetual <span class=\"_ _e\"></span>g<span class=\"_ _e\"></span>rowth <span class=\"_ _20\"></span>rate <span class=\"_ _20\"></span>of <span class=\"_ _e\"></span>3.<span class=\"_ _e\"></span>3<span class=\"_ _e\"></span>%. <span class=\"_ _20\"></span>This <span class=\"_ _20\"></span>long<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>term <span class=\"_ _20\"></span>growth <span class=\"_ _20\"></span>rate <span class=\"_ _e\"></span>is <span class=\"_ _20\"></span>hi<span class=\"_ _e\"></span>gher <span class=\"_ _20\"></span>than <span class=\"_ _20\"></span>long<span class=\"_ _2\"></span> <span class=\"_ _20\"></span>term <span class=\"_ _20\"></span>expected </span></span>inflation to<span class=\"_ _2\"></span> capture the returns generated from the si<span class=\"_ _e\"></span>gnificant investments in the business plan. 2.<span class=\"ls0\"> <span class=\"_ _53\"></span><span class=\"ff3f fs11 fc3\">Discounting <span class=\"_ _e\"></span>of future<span class=\"_ _2\"></span> dividends <span class=\"_ _e\"></span>(DDM-models):  </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity of 9.3% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on two variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on 1.13x RAB multiple in 2032<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> </span></span>NB: as such, th<span class=\"_ _2\"></span>e RAB<span class=\"_ _e\"></span> itself does <span class=\"_ _2\"></span>not take into account <span class=\"_ _e\"></span>the contribution of the incentive remuneration to the value creation process. o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a perpetual growth rate of 3.3<span class=\"_ _e\"></span><span class=\"ls24\">%.</span> Th<span class=\"_ _2\"></span>is approach assumes that the residual value consists <span class=\"_ _e\"></span>of profit </span></span>after tax less invest<span class=\"_ _e\"></span>ments and considers <span class=\"_ _e\"></span>net borrowings (i<span class=\"_ _e\"></span>n relation to th<span class=\"_ _e\"></span>e investments). <span class=\"_ _e\"></span>Howeve<span class=\"_ _e\"></span>r, profit <span class=\"_ _e\"></span>and thus di<span class=\"_ _e\"></span>vidend<span class=\"_ _e\"></span> paymen<span class=\"_ _2\"></span>ts in FY32 most likely does not yet reflect the (po<span class=\"_ _e\"></span>sitive) impact of the investments planned in FY26-FY32.<span class=\"_ _e\"></span> Conclusion: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> independent analysis, which was based on a <span class=\"ff42\">(\u20ac3,127 million)</span> midpoint of the different valuation approaches and variants </span></span>used did not result in<span class=\"_ _2\"></span> the identification of an<span class=\"_ _e\"></span> impairment of goodwill in the financial year 2022. Moreover, market multiples (based on current <span class=\"_ _2\"></span>enterprise values and current/forecasted EBITDA) were applied for plausibility.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">As the m<span class=\"_ _2\"></span>edian and the average of the different methods presented above w<span class=\"ff42\">er<span class=\"_ _e\"></span>e relatively far apart (\u20ac2.625 million and \u20ac4.635</span> </span></span>million respectively), mainly d<span class=\"_ _2\"></span>ue to differen<span class=\"ff42\">ces in <span class=\"_ _e\"></span>assumptions for<span class=\"_ _2\"></span> the terminal value, the expert\u2019s mid<span class=\"ff3f\">-poi<span class=\"_ _e\"></span>nt is based on 75% of </span></span>the median and 25<span class=\"_ _2\"></span>% of the average, bearing in mind, among other factors, that the median alone might not appropriately reflect the impa<span class=\"_ _2\"></span>ct of incentive remuneration on the t<span class=\"_ _e\"></span>erminal value (see above for more details)<span class=\"_ _2\"></span>. <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Due to<span class=\"_ _2\"></span> the increase in 2022 in the interest rates, the discount rate has increased significantly compared to last year. This <span class=\"_ _e\"></span>increase </span></span>has been fully ta<span class=\"_ _2\"></span>ken into account in the cost of equity wit<span class=\"_ _e\"></span>hout considering that it could be more linked to the maximu<span class=\"_ _e\"></span>m allowed return. Th<span class=\"_ _2\"></span>is approach results in conservative values. T<span class=\"_ _e\"></span>he valorisation is also impacted by the significant investments (and related cash outs) expected on the horizon of the plan (a<span class=\"_ _2\"></span>cceleration of the energy transition) whereas the returns on these investments will materialise<span class=\"_ _2\"></span> over a longer period. I<span class=\"_ _e\"></span>n this context, and all other things being equal, an increase of 1% of the cost of equity/ 50 basis point <span class=\"_ _2\"></span>in the WACC (market reference) would result i<span class=\"_ _e\"></span>n a 22% lower value<span class=\"_ _2\"></span> in use and a potential impairment loss of around \u20ac<span class=\"ff3f\">385.0<span class=\"_ _2\"></span> million. The evolution of market parameters is clos<span class=\"_ _e\"></span>ely monitored b<span class=\"_ _2\"></span>y the group <span class=\"_ _e\"></span>with the regulator in order to s<span class=\"_ _e\"></span>ecure the </span>realization<span class=\"_ _2\"></span> of the expected investments and allow ETB to <span class=\"_ _e\"></span>keep a strong<span class=\"_ _2\"></span> position in the market. A<span class=\"_ _e\"></span> decrease of 1% of the cost of equity/ 50 basis points in the d<span class=\"_ _2\"></span>iscount rates used would le<span class=\"_ _e\"></span>ad to an increase in the value of <span class=\"_ _2\"></span>the CGU of around \u20ac<span class=\"_ _e\"></span><span class=\"ff3f\">1,2<span class=\"_ _e\"></span>05.0 million<span class=\"_ _2\"></span>. </span>Acquisi<span class=\"_ _e\"></span>tion<span class=\"_ _2\"></span> of Eurogrid International \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In April 2<span class=\"_ _2\"></span>018, the acquisition of an extra 20% stake in Eurogrid International by the group <span class=\"ff42\">for \u20ac988.7</span> million resulted<span class=\"_ _e\"></span> in a goodwill </span></span>of \u20ac703.4<span class=\"ff3f\"> million, being the d<span class=\"_ _2\"></span>ifference between the ac<span class=\"_ _e\"></span>quisition value of this stake and the proportional carrying amount of its </span>assets. The goodwill re<span class=\"_ _2\"></span>sulting from the additional 20% sta<span class=\"_ _e\"></span>ke in Eurogrid In<span class=\"_ _2\"></span>ternational was allocated to the <span class=\"_ _e\"></span>CGU 50Hertz Transmission, sin<span class=\"_ _2\"></span>ce it comprises all income and ex<span class=\"_ _e\"></span>penses generated<span class=\"_ _2\"></span> thereof.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> impairment test was conducted by an independent expert. This impairment test is based on two main valuation methods: 1<span class=\"_ _e\"></span>) a </span></span>discounted cash flo<span class=\"_ _2\"></span>ws (DCF) method; a<span class=\"_ _e\"></span>nd 2) a dividend discount m<span class=\"_ _2\"></span>odel (DDM). Both <span class=\"_ _e\"></span>of these are further detached in valuation variants depending on the<span class=\"_ _2\"></span> terminal value calculation. Future cash flows and future dividends are based on a busi<span class=\"_ _e\"></span>ne<span class=\"_ _e\"></span>ss plan for the<span class=\"_ _2\"></span> period 2021-2031 (two regulatory periods). As the <span class=\"ff42\">group\u2019s </span>asset base consists of assets with long useful lives, the <span class=\"ff42\">b<span class=\"_ _e\"></span>usiness plan\u2019s</span> projection period was set to encompass the next two regulatory periods. The va<span class=\"_ _2\"></span>luation methods are subject to different assumptions, most importantly:<span class=\"_ _e\"></span> 1.<span class=\"ls0\"> <span class=\"_ _53\"></span><span class=\"ff3f fs11 fc3\">Discounting <span class=\"_ _e\"></span>of future<span class=\"_ _2\"></span> cash flows (DCF-m<span class=\"_ _e\"></span>odels): </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity: 8.3%; </span></span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Risk-fr<span class=\"_ _2\"></span>ee-rate: 2.2% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Beta<span class=\"_ _2\"></span> 0.93 </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Equity m<span class=\"_ _2\"></span>arket risk premium 5.5% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Cou<span class=\"_ _2\"></span>ntry risk premium 0.0% </span>\u25aa<span class=\"ff3f\"> <span class=\"_ _62\"> </span>Sma<span class=\"_ _2\"></span>ll firm premium 1.0% </span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Pre-tax Cost of Debt: 3.8%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Corporate tax rate: 30%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Target gearing (D/(D+E)): 60%; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">WAC<span class=\"_ _e\"></span>C: 4.9%. </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on three variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a 1<span class=\"ls1d\">.1</span>3x RAB multiple in 2032; </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a perpetual growth rate of 2.0<span class=\"ls24\">%.</span> </span></span>2.<span class=\"ls0\"> <span class=\"_ _57\"></span><span class=\"ff3f fs11 fc3\">D<span class=\"_ _e\"></span>iscounting of future dividends <span class=\"_ _e\"></span>(DDM-models): <span class=\"_ _2\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Discount r<span class=\"_ _2\"></span>ate:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Cost of Equity: 8.3% </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Ter<span class=\"_ _2\"></span>minal value based on two variants:<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on 1.13x RAB multiple in 2032;<span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">Terminal value based on a perpetual growth rate of 2.0%. </span></span>Conclusion: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Neither<span class=\"_ _2\"></span> the independent analysis, which was based on a <span class=\"ff42\">(<span class=\"_ _e\"></span>\u20ac2,602 million)</span> midpoint of the different valuation approaches and<span class=\"_ _2\"></span> </span></span>variants u<span class=\"_ _2\"></span>sed, nor the sensitivity analysis result<span class=\"ls5b\">ed</span> in<span class=\"_ _e\"></span> the identification of an impairment of goodwill in the financial year 2022<span class=\"ls1d\">. </span>Moreo<span class=\"_ _2\"></span>ver, market multiples (based on current enterprise values and current/forecasted EBITDA) were applied for plausibility.<span class=\"_ _20\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> median of the different methods presented above w<span class=\"ff42\">e<span class=\"_ _e\"></span>re rela<span class=\"_ _2\"></span>tively close (\u20ac2,602 million and \u20ac3,055 million respectively), as the </span></span></span>assumptions for<span class=\"_ _2\"></span> the terminal value were similar. Neither the independent analysis<span class=\"_ _e\"></span> based on a median of the different valuation approaches and variants used, nor the sensitivity analysis resulted in the identification of an impairment of goodwill in the financial year 2022. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Due to<span class=\"_ _2\"></span> the increase in 2022 in the interest rates, the discount rate has increased significantly compared to last year. This <span class=\"_ _e\"></span><span class=\"ls1c\">in</span>crease </span></span>has been fully ta<span class=\"_ _2\"></span>ken into account in the cost of equity wit<span class=\"_ _e\"></span>hout considering that it could be more linked to the maximu<span class=\"_ _e\"></span>m allowed return. Th<span class=\"_ _2\"></span>is approach results in conservative values. T<span class=\"_ _e\"></span>he valorisation is also impacted by the significant investments (and related cash outs) expected on the horizon of the plan (a<span class=\"_ _2\"></span>cceleration of the energy transition) whereas the returns on these investments will materialise<span class=\"_ _2\"></span> over a longer period. I<span class=\"_ _e\"></span>n this context, and all other things being equal, an increase of 1% of the cost of equity/ 50 basis point <span class=\"_ _2\"></span>in the WACC (market reference) would result i<span class=\"_ _e\"></span>n a <span class=\"ls5b\">19</span>% lower value in use, being a value slightly higher than the book value. A decrease<span class=\"_ _2\"></span> of 1% of the cost of equity/ 50 basis points in the discount rates used would lead to an increase i<span class=\"_ _e\"></span>n the value of the CGU of arou<span class=\"_ _2\"></span>nd \u20ac<span class=\"ff3f\">385.8 million.<span class=\"_ _e\"></span> </span>Write-down<span class=\"_ _2\"></span>s are recorded following the non-utilisatio<span class=\"_ _e\"></span>n of stock items based on the<span class=\"_ _2\"></span>ir underlying rotation. These wer<span class=\"_ _e\"></span>e slightly higher than in <span class=\"ls5b\">2021</span>.c<span class=\"_ _e\"></span>redit risk, etc. can be settled in the tariffs, in a<span class=\"_ _2\"></span>ccordance with the applicable legi<span class=\"_ _e\"></span>slation. MARKET RISK The market risk take<span class=\"_ _2\"></span>s into account negative effects on the financial positi<span class=\"_ _e\"></span>on and cash flows of the group arising as a result of price changes on the market which cannot be otherwise avoided. The activities o<span class=\"_ _2\"></span>f the grou<span class=\"_ _e\"></span>p extend to the ele<span class=\"_ _2\"></span>ctricity mark<span class=\"_ _e\"></span>et <span class=\"ff42\">\u2013</span> in particular through selling<span class=\"_ _2\"></span> the electricity generated from renewa<span class=\"_ _e\"></span>ble energy as well as the procurement of energy to cover grid energ<span class=\"_ _2\"></span>y losses <span class=\"ff42\">\u2013</span> <span class=\"_ _e\"></span>as well as to th<span class=\"_ _2\"></span>e market for short-term deposits. In Germany, t<span class=\"ls5b\">he </span>gr<span class=\"_ _e\"></span>oup counteracts the procurement price risk for grid loss energy by hedging<span class=\"_ _2\"></span> prices at an early stage using futures contracts on the EEX electricity exchange<span class=\"_ _20\"></span> Foreign curren<span class=\"_ _e\"></span>cy risk<span class=\"_ _2\"></span> <span class=\"_ _251\"> </span> The group<span class=\"_ _2\"></span> is not exposed to any significant currency risk, <span class=\"_ _e\"></span>either from transa<span class=\"_ _2\"></span>ctions or from exchanging foreign currencies into euro, si<span class=\"_ _e\"></span>nce it has no material foreign investments or activities and less than 1<span class=\"_ _2\"></span>% of its costs are expressed in currencies other than euro<span class=\"_ _e\"></span>s. Inter<span class=\"_ _e\"></span>est rate risk<span class=\"_ _2\"></span> Intere<span class=\"_ _2\"></span>st rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of c<span class=\"_ _e\"></span>hanges in market interest rate<span class=\"_ _2\"></span>s. The Group's exposure to the risk of changes in market interest rates relates prima<span class=\"_ _e\"></span>rily to its long-term debt obligations with floating interest<span class=\"_ _2\"></span> rates. As at 31 December 2022, 5 interest<span class=\"_ _e\"></span>-rate swaps were outstanding in connection with pre-hedgi<span class=\"_ _e\"></span>ng of probable forecasted debt transactions. T<span class=\"_ _2\"></span>he interest rate swaps on the other loan and the loan with Publi-Part to cover a nominal debt amount of \u20ac300 m<span class=\"_ _2\"></span>illion were settled in June 2020, together with the repayment of the loans. <span class=\"_ _e\"></span><span class=\"ff3f\"> </span>See Note 6.13 for a summa<span class=\"_ _2\"></span>ry of the outstanding loans an<span class=\"_ _e\"></span>d their respective interest rates. CREDIT RISK Credit risk encompasses a<span class=\"_ _2\"></span>ll forms of counterparty exposure, i.e. where counterparties may default on their obligations to the group in relation to lend<span class=\"_ _2\"></span>ing, hedging, settlement and other financial activities. The group is exposed to credit risk from its op<span class=\"_ _e\"></span>erating activities and treasur<span class=\"_ _2\"></span>y activities. With regards <span class=\"ls1d\">to<span class=\"_ _e\"></span></span> its operating activities, the group <span class=\"ff42\">has a credit policy in place, which takes into account cu<span class=\"_ _2\"></span>stomer\u2019s risk </span>profiles. The e<span class=\"_ _2\"></span>xposure to credit risk is monitored on an ongoing basis, resulting in a request to issue bank guaranties from t<span class=\"_ _e\"></span>he counterparty<span class=\"_ _2\"></span> for some major contracts.<span class=\"_ _e\"></span> At the end<span class=\"_ _2\"></span> of the reporting period there were no significant concentrations of credit risks. The maximum credit risk is the carrying amoun<span class=\"_ _2\"></span>t for each financial asset, including derivative financial instruments.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Note 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Immedia<span class=\"_ _2\"></span>tely claimable deposits<span class=\"_ _e\"></span> 7.0  7.0  Reimbursemen<span class=\"_ _2\"></span>t rights<span class=\"_ _e\"></span> 34.6  46.2  Other shareholding<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> 75.6  43.8  Derivatives (<span class=\"_ _2\"></span>Current and Non-current)<span class=\"_ _e\"></span> 219.7  355.6  Other financial <span class=\"_ _2\"></span>assets (Current and Non-c<span class=\"_ _e\"></span>urrent) (6.6) 336.9  452.5  Non-current t<span class=\"_ _2\"></span>rade and other r<span class=\"_ _e\"></span>eceivables 95.5  0.5  Trade and other receiv<span class=\"_ _2\"></span>ables (6.9) 1,206.2  861.3  Current tax<span class=\"_ _2\"></span> assets<span class=\"_ _e\"></span> (6.10) 28.6  10.1  Cash and cash<span class=\"_ _2\"></span> equivalents<span class=\"_ _e\"></span> (6.11) 4,151.2  3,049.5  Deferred charges (6.9) 25.1  18.1  Total 5,843.5  4,392.0  The movement in the allowance for expe<span class=\"_ _2\"></span>cted credit losses<span class=\"_ _e\"></span> in relation to trade receivables during the year was as outlined in the table below: <span class=\"_ _15e\"> </span> (in \u20ac million)<span class=\"ff40\"> </span>Bad debtors Impairment losses Remaining ba<span class=\"_ _2\"></span>lance<span class=\"_ _e\"></span> Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 201.5  (201.0) 0.4  Changes during the year (0.1) 0.2  0.1  Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 201.4  (200.8) 0.5  Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 201.4  (200.8) 0.5  Changes during the year 0.8  (0.8) 0.0  Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 202.2  (201.7) 0.5  Almost all bad<span class=\"_ _2\"></span> debtors are related to outstanding receivables <span class=\"_ _e\"></span>linked to the regulatory levies in Germany. If a debtor <span class=\"_ _e\"></span>goes bankrupt, 50Hertz Tran<span class=\"_ _2\"></span>smission is compensated by the reg<span class=\"_ _e\"></span>ulator for the loss incurred. The group<span class=\"_ _2\"></span> believes that the unimpaired amounts overdue by more than 30 <span class=\"_ _e\"></span>days are still collectible, based on historical payment behaviour and extensive an<span class=\"_ _2\"></span>alysis of customer credit risk, including customers' underlying credit ratings, when available. The<span class=\"_ _e\"></span> credit quality of trade<span class=\"_ _2\"></span> and other receivables is assessed based on a credit policy.<span class=\"_ _e\"></span> IFRS 9 requires <span class=\"_ _2\"></span>the group to impair financial assets based on a forward-looki<span class=\"_ _e\"></span>ng expected credit loss (ECL) approach. <span class=\"ff45\"> </span>As of 2022<span class=\"_ _2\"></span>, the group applies an individualized approach for trade receivables, for w<span class=\"_ _e\"></span>hich the Group has set ru<span class=\"_ _2\"></span>les fo<span class=\"_ _e\"></span>r defining the s<span class=\"_ _2\"></span>tage of the concer<span class=\"_ _2\"></span>ned asset for Expected Credit Loss (ECL) ca<span class=\"_ _e\"></span>lculations. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">sta<span class=\"_ _2\"></span>ge 1<span class=\"ff3f\"> covers financial assets that have not deteriorated significantly since initial recognition. The ECL for<span class=\"_ _2\"></span> stage<span class=\"_ _e\"></span> 1 <span class=\"_ _e\"></span>is calculated </span></span></span>on a 12-month basis, \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">sta<span class=\"_ _2\"></span>ge 2<span class=\"ff3f\"> covers financial assets for which the credit risk has significantly increased. The ECL for stage 2 is calculated on a lifetim<span class=\"_ _e\"></span><span class=\"ls5b\">e </span></span></span></span>basis. The decisio<span class=\"_ _2\"></span>n to move an asset from stage 1 to stage 2 is based on certain cr<span class=\"_ _e\"></span>iteria such as:  o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">a significant downgrade in the creditworthiness of a counterparty and/or its parent company and/or its guara<span class=\"_ _2\"></span>ntor (if <span class=\"_ _e\"></span>any), <span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">significant adverse changes in the regulatory environment, </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">changes in political or country-related risks, and  </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">any other aspect the Group may consider relevant.  </span></span>Regarding fina<span class=\"_ _2\"></span>ncial assets that are more than 30 days past due, the move to stage 2 is not systematically applied as long as t<span class=\"_ _e\"></span>he Group has rea<span class=\"_ _2\"></span>sonable and supporting infor<span class=\"_ _e\"></span>mation that demonstrates that, even if payments become more than 30 days past due, this does not repre<span class=\"_ _2\"></span>sent a significant increase in the credit risk since initial recognition.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">sta<span class=\"_ _2\"></span>ge 3<span class=\"ff3f\"> covers assets for which default has already been observed, such as:<span class=\"_ _e\"></span> </span></span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">when there is <span class=\"_ _2\"></span>evidence of failure in cre<span class=\"_ _2\"></span>dit support fr<span class=\"_ _2\"></span>om a parent company to<span class=\"_ _2\"></span> its subsidiary (in t<span class=\"_ _2\"></span>his case th<span class=\"_ _2\"></span>e subsidiary is the </span></span>Group\u2019s counterparty at r<span class=\"_ _2\"></span>isk),<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">when a Group entity has initiated legal proceedings against the counterparty for non-payment.<span class=\"_ _e\"></span> </span></span>Regarding fina<span class=\"_ _2\"></span>ncial assets that are more than 90 days pa<span class=\"_ _e\"></span>st due, the presumption can be<span class=\"_ _2\"></span> rebutted if the Group has reasonable and suppor<span class=\"_ _2\"></span>table information that demonstrates that even if pa<span class=\"_ _e\"></span>yments become<span class=\"_ _2\"></span> more than 90 days past due, this does not<span class=\"_ _e\"></span> indicate counterparty<span class=\"_ _2\"></span> default.<span class=\"_ _e\"></span> The ECL formula<span class=\"_ _2\"></span> applicable in stages 1 and 2 is ECL = E<span class=\"_ _e\"></span>AD x PD x LGD, where: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">for 1<span class=\"_ _2\"></span>2-month ECL, Exposure At Default (EAD) equals the carrying<span class=\"_ _2\"></span> amount of the financial asset, to which the relevant Probability </span></span>of Default (PD) an<span class=\"_ _2\"></span>d the Loss Given Default (LGD) are applied<span class=\"_ _e\"></span><span class=\"ls1d\">; <span class=\"_ _e\"></span></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">for life<span class=\"_ _2\"></span>time ECL, the calculation method consists in identifying changes in exposure for each year, especially the expected ti<span class=\"_ _e\"></span>ming </span></span>and amount of th<span class=\"_ _2\"></span>e contractual repayments, and then applying to each repayment the relevant PD and the LGD, and discounting<span class=\"_ _e\"></span> the figures ob<span class=\"_ _2\"></span>tained. ECL is then the sum of the discounted figures; and <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">pro<span class=\"_ _2\"></span>bability of default is the likelihood of default over a particular time horizon (in stage 1, this time horizon is 12 month<span class=\"_ _e\"></span>s after the </span></span>repor<span class=\"_ _2\"></span>ting period; in stage 2 this time horizon is the e<span class=\"_ _e\"></span>ntire lifetime of the financial asset). This informa<span class=\"_ _2\"></span>tion is based on external data from a<span class=\"_ _2\"></span> well-known rating agency. The PD depends on the time horizon and of the rating of the counterparty. <span class=\"_ _e\"></span> The Group uses externa<span class=\"_ _2\"></span>l ratings if they are available; <span class=\"_ _e\"></span>or an internal ra<span class=\"_ _2\"></span>ting for major counterparties with no external <span class=\"_ _e\"></span>rating.  Elia Group d<span class=\"_ _2\"></span>id not see any changes in payment behaviour, nor an increase in bad debtors as a consequence of the crisis in 202<span class=\"_ _e\"></span><span class=\"ls5b\">1 </span>(C<span class=\"ls0\">OVID-<span class=\"ls5b\">19</span>) nor in 2022 (energy crisis) and it does not ex<span class=\"_ _e\"></span>pect any major impact related to the pandemic to arise in the coming years.<span class=\"_ _e\"></span> </span>Subsequently, a loss <span class=\"_ _2\"></span>given default is calculated as the percentage of the amount of trade receivables that is not covered b<span class=\"_ _2\"></span>y <span class=\"_ _e\"></span>a ba<span class=\"_ _e\"></span>nk guarantee.<span class=\"_ _2\"></span> <span class=\"ff42\">The total outstanding amount of trade receivables covered by a bank guarantee totals \u20ac97.1 million. The loss given default<span class=\"_ _e\"></span></span> is multiplied b<span class=\"_ _2\"></span>y the outstanding trade receivables.<span class=\"_ _e\"></span> This approa<span class=\"_ _2\"></span>ch is deemed more relevant than the portfolio approach to provid<span class=\"_ _e\"></span>e a better assessment of the risk, especially in the current context o<span class=\"_ _2\"></span>f volatile market conditions. The impact of this new approach is not significant. Furthermore, any <span class=\"_ _e\"></span>losses would be recoverable through the<span class=\"_ _2\"></span> tariffs. <span class=\"_ _e\"></span> The model is applied to the<span class=\"_ _2\"></span> trade receivables, all other fin<span class=\"_ _e\"></span>ancial assets<span class=\"_ _2\"></span> being not assessed at risk of impairment co<span class=\"_ _e\"></span>nsidering<span class=\"_ _2\"></span> their nature (regu<span class=\"_ _2\"></span>latory assets, amounts recoverable through future tariffs in compliance with the regulatory frameworks), risk profile (reliable counterparty<span class=\"_ _2\"></span> being for the levies the Belgian/German stat<span class=\"_ _e\"></span>e) or measurement metho<span class=\"_ _2\"></span>d (at fair value). More details are provided in the different note<span class=\"_ _2\"></span>s.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfImpairmentOfAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__70-1": {
   "value": "6.4. <span class=\"_ _87\"> </span>Non current trade and other receivables The non curren<span class=\"_ _2\"></span>t trade and other receivables are mainly composed by <span class=\"ff42\">th<span class=\"_ _e\"></span>e long term part of the granted investment subsidy (\u20ac95.0 </span>million). On 20 November 2022, a Ro<span class=\"_ _2\"></span>yal Decree has granted an investment subsidy for the creation of an offshore artificial islan<span class=\"_ _e\"></span>d (The Princess Elisabeth Islan<span class=\"_ _2\"></span>d) within the framework of t<span class=\"_ _e\"></span>he Recovery and Resilience Facility (EU instrument to support project of Member State<span class=\"_ _2\"></span>s and help the<span class=\"_ _2\"></span> EU emerge stronger and more resilient from the current crisis<span class=\"_ _e\"></span>). This island will serve as a multifunctional energy hub/an extension of the electr<span class=\"_ _2\"></span>icity grid in the North Sea. It will connect wind farms from the sea to the mainland and create new co<span class=\"_ _e\"></span>nnections with neighbour<span class=\"_ _2\"></span>ing countries. The text of the RD provides that the practical details will be agreed upon by a \u201cProtocol\u201d betwe<span class=\"ff3f\">e<span class=\"_ _e\"></span>n the State </span>and Elia. T<span class=\"_ _2\"></span>his Protocol was signed on 14 December 2022, providing for the intervention of the SPF Economy up to <span class=\"_ _e\"></span><span class=\"ff42\">a subsidy of \u20ac99,7 </span>millions out <span class=\"_ _2\"></span>of a total budgeted investment of circa \u20ac600.0 millions.<span class=\"_ _20\"></span><span class=\"ff3f\"> </span>Out of th<span class=\"_ _2\"></span>is amount, \u20ac97.5 million are classified as an investment grant agains<span class=\"ff3f\">t<span class=\"_ _e\"></span> </span>\u20ac2.2 million as operational grant. Cash will be collected as predefined milesto<span class=\"_ _2\"></span>nes are <span class=\"ff42\">reached. The agreed planni<span class=\"_ _e\"></span>ng resu<span class=\"_ _2\"></span>lts in a split \u20ac95.0 million classified as long term and \u20ac4.7 million in </span>short term. The recoverability of <span class=\"_ _2\"></span>this amount is contractually guaranteed. No credit risk has been considered on this long<span class=\"_ _e\"></span>-term receivable.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.6. <span class=\"_ _87\"> </span>Other financial assets (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Immedia<span class=\"_ _2\"></span>tely claimable deposits<span class=\"_ _e\"></span> 7.0 7.0 Reimbursemen<span class=\"_ _2\"></span>t rights<span class=\"_ _e\"></span> 33.7 46.2 Other shareholding<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> 75.7 43.8 Other 0.8 Non-current deriva<span class=\"_ _2\"></span>tives 0.0 39.4 Other financial <span class=\"_ _2\"></span>assets (non-current)<span class=\"_ _e\"></span> 117.2 136.3 Curren<span class=\"_ _2\"></span>t derivatives<span class=\"_ _e\"></span> 219.7 316.2 Other financial <span class=\"_ _2\"></span>assets (current) 219.7 316.2 Other financial <span class=\"_ _2\"></span>assets<span class=\"_ _e\"></span> 336.9 452.5 The total other f<span class=\"_ _2\"></span>inancial assets decreased by \u20ac115.6 million compared with the previous <span class=\"ff3f\">yea<span class=\"_ _e\"></span>r. </span>Immedia<span class=\"_ _2\"></span>tely claimable deposits are measured at fair value. The risk profile of these investments is discussed in Note 8.1. <span class=\"_ _e\"></span>The value as at 31 December 2022 is stab<span class=\"_ _2\"></span>le compared to 2021.<span class=\"_ _e\"></span> Re<span class=\"ls0\">imbur<span class=\"_ _2\"></span>sement rights are linked to the obligations regard<span class=\"_ _e\"></span>ing (i) the retired employees falling under sp<span class=\"_ _2\"></span>ecific benefit <span class=\"_ _e\"></span>schemes (<span class=\"_ _2\"></span>Scheme<span class=\"_ _e\"></span> <span class=\"ls27\">B </span></span>- unfunded<span class=\"_ _2\"></span> plan); <span class=\"ls5b\">an</span>d <span class=\"_ _e\"></span>for (ii) health plan and reduced energy pricing plans for retired staff members. See Note 6.14<span class=\"_ _e\"></span><span class=\"ff42\">: \u2018Employee benefits\u2019. </span>The reimbursem<span class=\"_ _2\"></span>ent rights are recoverable through the regulated tariffs. The following principle applies: all incurred pension c<span class=\"_ _e\"></span>osts for 'Scheme B' retired<span class=\"_ _2\"></span> employees and the costs linked to healthcare and r<span class=\"_ _e\"></span>educed energy pricing plans for retired Elia staff members are defined by the<span class=\"_ _2\"></span> regulator (CREG) as non-controllable expe<span class=\"_ _e\"></span>nses that are recoverable through the regulatory tariffs. The decrease in the carrying<span class=\"_ _2\"></span> value of this asset is disclosed in Note 6.14<span class=\"ff42\">: \u2018Employee benefits\u2019</span> and mainly explained by the change i<span class=\"_ _e\"></span>n discount rate. Considerin<span class=\"_ _2\"></span>g the nature (regulatory asset) of these financi<span class=\"_ _e\"></span>al assets, they are not considered to be at risk o<span class=\"_ _2\"></span>f impairm<span class=\"_ _e\"></span>ent.  Other shareholding<span class=\"_ _2\"></span>s: t<span class=\"ls5b\">he </span>g<span class=\"_ _e\"></span>roup holds 5.3% (at 100%) of the shares in European Energy Exchange (EEX), Leipzig, Germany, for a tot<span class=\"_ _e\"></span>al value of \u20ac42.7<span class=\"_ _2\"></span> million as of the reporting date. These shares are disclosed under Other shareholdings <span class=\"_ _e\"></span><span class=\"ff3f\">in addition to <span class=\"_ _e\"></span>an 8.0% (at 100<span class=\"_ _2\"></span>%) </span>shareholding in<span class=\"_ _2\"></span> JAO Joint Allocation Office SA, a 6.7% (at 100%) shareholding in TSCNET Services GmbH (Munich, Germany) and a<span class=\"_ _e\"></span> 10.4% (at 100%) shareholding<span class=\"_ _2\"></span> in the Stiftung Kurt<span class=\"_ _e\"></span>-Sanderling-Akademie des Konzerthausorchesters foundation (Be<span class=\"_ _e\"></span>rlin, Germany). Other in<span class=\"_ _2\"></span>vestments are measured at fair value. At each reporting date, a re<span class=\"_ _e\"></span>-measurement is performed to re-evaluate these investments. Any deviation from<span class=\"_ _2\"></span> the previous period is recorded under other comprehensive income. T<span class=\"_ _e\"></span>he reassessment 2022 resulted in an increase of \u20ac32.7 million based<span class=\"_ _2\"></span> on a total fair value of \u20ac75.4 million. The remaining balance is related to JAO (\u20ac0.3 million).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Derivatives<span class=\"ls1d\">: s</span>ince 2021, 50Hertz applies hedge a<span class=\"_ _2\"></span>ccounting for the purpose of reducing the risk of fluctuations in the<span class=\"_ _e\"></span> expected amount of grid losses.<span class=\"_ _2\"></span> Due to the drop in energy prices in the last qu<span class=\"_ _e\"></span>arter of the year<span class=\"_ _2\"></span>, the fair value of these contracts decreased t<span class=\"_ _e\"></span><span class=\"ff42\">o \u20ac154.4 million </span>(current derivatives). Lo<span class=\"_ _2\"></span>ng term contracts shows a negative fair value. T<span class=\"_ _e\"></span>his evolution explains an overall decrease of <span class=\"ff42\">\u20ac</span><span class=\"ls5b\">201<span class=\"ls1d\">.3</span></span> million <span class=\"_ _e\"></span>(-\u20ac39.4 million <span class=\"ff3f\">in long-term derivatives and -</span>\u20ac161.9 million <span class=\"ff3f\">in short-term derivatives)<span class=\"ls1d\">. </span>This decrease is partly offset by the positive value </span>accounted for<span class=\"_ _2\"></span> in Belgium in connection with the pre-<span class=\"_ _e\"></span>hedging of probable forecast debt transactions (bonds issuance). The fair value of these derivatives amounted<span class=\"_ _2\"></span> to \u20ac65.3 million. <span class=\"ff3f\">S<span class=\"_ _e\"></span>ee Note 8.1 for more info on these derivatives. </span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.9. <span class=\"_ _87\"> </span>Current trade and other receivables, deferred charges and accrue<span class=\"_ _2\"></span>d revenues<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Contract assets 0.9 2.9 Trade rece<span class=\"_ _2\"></span>ivables<span class=\"_ _e\"></span> 748.7 716.5 Advance pa<span class=\"_ _2\"></span>yments<span class=\"_ _e\"></span> 1.9 1.0 Levies 80<span class=\"ls0\">.5 </span>36.6 VAT and other t<span class=\"_ _2\"></span>axes<span class=\"_ _e\"></span> 145.6 79.1 Other 2<span class=\"ls5b\">28</span>.7 25.1 Trade and other receiv<span class=\"_ _2\"></span>ables 1,206.2 861.3 Deferred charges 20.2 18.1 Accrued interests 4.9 Deferred charges and<span class=\"_ _2\"></span> accrued revenues<span class=\"_ _e\"></span> 25.1 18.1 Total 1,231.4 879.4 The total current <span class=\"_ _2\"></span>trade and other receivables, deferred charges and <span class=\"ff42\">acc<span class=\"_ _e\"></span>rued revenues increased by \u20ac352.0 million compared with the </span>previous <span class=\"_ _2\"></span>year. This is mainly explained by the cash collateral reported by the German segment for a total of \u20ac239.0 million a<span class=\"_ _e\"></span><span class=\"ff3f\">nd the </span>higher amount of <span class=\"_ _2\"></span>trade receivables and levies in a context of<span class=\"_ _e\"></span> rising prices. Contract assets are ma<span class=\"_ _2\"></span>inly related to<span class=\"_ _e\"></span> EGI's business and transmission system operations. The position decreased from <span class=\"ff42\">\u20ac2.9 million</span> in the previous year <span class=\"ff42\">to \u20ac0.9 million at <span class=\"_ _2\"></span>year<span class=\"ff3f\">-<span class=\"ls5b\">end.<span class=\"_ _e\"></span></span> </span></span>Trade rece<span class=\"_ _2\"></span>ivables are non-interest<span class=\"_ _e\"></span>-bearing and genera<span class=\"_ _2\"></span>lly have payment terms of 15<span class=\"_ _e\"></span> to 30 days. The increase is driven by both Belgian<span class=\"_ _2\"></span> and German<span class=\"_ _2\"></span> segments against a background of high activity and a significant increase in energy prices.<span class=\"_ _e\"></span> The increase in the le<span class=\"_ _2\"></span>vies is mainly attributable to Germany<span class=\"_ _e\"></span> <span class=\"ff42\">where the offshore receivable position rose from \u20ac20.9 million to<span class=\"_ _2\"></span> \u20ac6<span class=\"_ _e\"></span><span class=\"ff3f\">8.9 </span></span>mi<span class=\"ls1c\">ll<span class=\"ls0\">ion at year end in 2022. </span></span>\u2018Other receivab<span class=\"_ _2\"></span>les\u2019 mainly relate to <span class=\"ff3f\">the margin calls <span class=\"ls57\">(a</span>dvances received or paid as part of co<span class=\"_ _2\"></span>llateralization agreeme<span class=\"_ _e\"></span>nts set up by the </span>group<span class=\"_ _2\"></span> to manage counterparty risk on commodity transact<span class=\"_ _e\"></span>ions) of the German segments <span class=\"ff42\">(\u20ac239 million)</span>. The group<span class=\"_ _2\"></span>'s exposure to credit and currency risks, and impairment losses related to trade receivables are shown in Note<span class=\"_ _e\"></span> 8.1. At 31 December, <span class=\"_ _2\"></span>the ageing analysis of trade receiv<span class=\"_ _e\"></span>ables is as follows: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Not past due 639.6 687.4 Past due 0-30 days 75.6 15.1 Past due 3<span class=\"_ _2\"></span>1-60 days<span class=\"_ _e\"></span> 29.3 2.4 Past due 6<span class=\"_ _2\"></span>1 days <span class=\"_ _e\"></span>- one year 1.8 11.1 Past due o<span class=\"_ _2\"></span>ne year - two years 2.8 2.1 Total (e<span class=\"_ _2\"></span>xcl. impairm<span class=\"_ _e\"></span>ent) 749.1 718.1 Doubtful amounts 202.2 201.4 Amounts write-offs (201.7) (200.8) Allowance for e<span class=\"_ _2\"></span>xpected credit losses<span class=\"_ _e\"></span> (0.9) (2.1) Total 748.7 716.5 See Note 8.1 for<span class=\"_ _2\"></span> a detailed analysis of the credit risk incur<span class=\"_ _e\"></span>red in connection with these trade receiva<span class=\"_ _2\"></span>bles.<span class=\"_ _20\"></span> Considerin<span class=\"_ _2\"></span>g the nature (as regulatory assets) and/or the risk profile of the counterparties (Belgian/German state) of the mos<span class=\"_ _e\"></span>t significant other receiva<span class=\"_ _2\"></span>bles, there is a low impairment risk and thus i<span class=\"_ _e\"></span>t is not needed<span class=\"_ _2\"></span> to record a loss allowance.<span class=\"_ _e\"></span><span class=\"ff40\"> </span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__66-1": {
   "value": "6.4. <span class=\"_ _87\"> </span>Non current trade and other receivables The non curren<span class=\"_ _2\"></span>t trade and other receivables are mainly composed by <span class=\"ff42\">th<span class=\"_ _e\"></span>e long term part of the granted investment subsidy (\u20ac95.0 </span>million). On 20 November 2022, a Ro<span class=\"_ _2\"></span>yal Decree has granted an investment subsidy for the creation of an offshore artificial islan<span class=\"_ _e\"></span>d (The Princess Elisabeth Islan<span class=\"_ _2\"></span>d) within the framework of t<span class=\"_ _e\"></span>he Recovery and Resilience Facility (EU instrument to support project of Member State<span class=\"_ _2\"></span>s and help the<span class=\"_ _2\"></span> EU emerge stronger and more resilient from the current crisis<span class=\"_ _e\"></span>). This island will serve as a multifunctional energy hub/an extension of the electr<span class=\"_ _2\"></span>icity grid in the North Sea. It will connect wind farms from the sea to the mainland and create new co<span class=\"_ _e\"></span>nnections with neighbour<span class=\"_ _2\"></span>ing countries. The text of the RD provides that the practical details will be agreed upon by a \u201cProtocol\u201d betwe<span class=\"ff3f\">e<span class=\"_ _e\"></span>n the State </span>and Elia. T<span class=\"_ _2\"></span>his Protocol was signed on 14 December 2022, providing for the intervention of the SPF Economy up to <span class=\"_ _e\"></span><span class=\"ff42\">a subsidy of \u20ac99,7 </span>millions out <span class=\"_ _2\"></span>of a total budgeted investment of circa \u20ac600.0 millions.<span class=\"_ _20\"></span><span class=\"ff3f\"> </span>Out of th<span class=\"_ _2\"></span>is amount, \u20ac97.5 million are classified as an investment grant agains<span class=\"ff3f\">t<span class=\"_ _e\"></span> </span>\u20ac2.2 million as operational grant. Cash will be collected as predefined milesto<span class=\"_ _2\"></span>nes are <span class=\"ff42\">reached. The agreed planni<span class=\"_ _e\"></span>ng resu<span class=\"_ _2\"></span>lts in a split \u20ac95.0 million classified as long term and \u20ac4.7 million in </span>short term. The recoverability of <span class=\"_ _2\"></span>this amount is contractually guaranteed. No credit risk has been considered on this long<span class=\"_ _e\"></span>-term receivable.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.6. <span class=\"_ _87\"> </span>Other financial assets (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Immedia<span class=\"_ _2\"></span>tely claimable deposits<span class=\"_ _e\"></span> 7.0 7.0 Reimbursemen<span class=\"_ _2\"></span>t rights<span class=\"_ _e\"></span> 33.7 46.2 Other shareholding<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> 75.7 43.8 Other 0.8 Non-current deriva<span class=\"_ _2\"></span>tives 0.0 39.4 Other financial <span class=\"_ _2\"></span>assets (non-current)<span class=\"_ _e\"></span> 117.2 136.3 Curren<span class=\"_ _2\"></span>t derivatives<span class=\"_ _e\"></span> 219.7 316.2 Other financial <span class=\"_ _2\"></span>assets (current) 219.7 316.2 Other financial <span class=\"_ _2\"></span>assets<span class=\"_ _e\"></span> 336.9 452.5 The total other f<span class=\"_ _2\"></span>inancial assets decreased by \u20ac115.6 million compared with the previous <span class=\"ff3f\">yea<span class=\"_ _e\"></span>r. </span>Immedia<span class=\"_ _2\"></span>tely claimable deposits are measured at fair value. The risk profile of these investments is discussed in Note 8.1. <span class=\"_ _e\"></span>The value as at 31 December 2022 is stab<span class=\"_ _2\"></span>le compared to 2021.<span class=\"_ _e\"></span> Re<span class=\"ls0\">imbur<span class=\"_ _2\"></span>sement rights are linked to the obligations regard<span class=\"_ _e\"></span>ing (i) the retired employees falling under sp<span class=\"_ _2\"></span>ecific benefit <span class=\"_ _e\"></span>schemes (<span class=\"_ _2\"></span>Scheme<span class=\"_ _e\"></span> <span class=\"ls27\">B </span></span>- unfunded<span class=\"_ _2\"></span> plan); <span class=\"ls5b\">an</span>d <span class=\"_ _e\"></span>for (ii) health plan and reduced energy pricing plans for retired staff members. See Note 6.14<span class=\"_ _e\"></span><span class=\"ff42\">: \u2018Employee benefits\u2019. </span>The reimbursem<span class=\"_ _2\"></span>ent rights are recoverable through the regulated tariffs. The following principle applies: all incurred pension c<span class=\"_ _e\"></span>osts for 'Scheme B' retired<span class=\"_ _2\"></span> employees and the costs linked to healthcare and r<span class=\"_ _e\"></span>educed energy pricing plans for retired Elia staff members are defined by the<span class=\"_ _2\"></span> regulator (CREG) as non-controllable expe<span class=\"_ _e\"></span>nses that are recoverable through the regulatory tariffs. The decrease in the carrying<span class=\"_ _2\"></span> value of this asset is disclosed in Note 6.14<span class=\"ff42\">: \u2018Employee benefits\u2019</span> and mainly explained by the change i<span class=\"_ _e\"></span>n discount rate. Considerin<span class=\"_ _2\"></span>g the nature (regulatory asset) of these financi<span class=\"_ _e\"></span>al assets, they are not considered to be at risk o<span class=\"_ _2\"></span>f impairm<span class=\"_ _e\"></span>ent.  Other shareholding<span class=\"_ _2\"></span>s: t<span class=\"ls5b\">he </span>g<span class=\"_ _e\"></span>roup holds 5.3% (at 100%) of the shares in European Energy Exchange (EEX), Leipzig, Germany, for a tot<span class=\"_ _e\"></span>al value of \u20ac42.7<span class=\"_ _2\"></span> million as of the reporting date. These shares are disclosed under Other shareholdings <span class=\"_ _e\"></span><span class=\"ff3f\">in addition to <span class=\"_ _e\"></span>an 8.0% (at 100<span class=\"_ _2\"></span>%) </span>shareholding in<span class=\"_ _2\"></span> JAO Joint Allocation Office SA, a 6.7% (at 100%) shareholding in TSCNET Services GmbH (Munich, Germany) and a<span class=\"_ _e\"></span> 10.4% (at 100%) shareholding<span class=\"_ _2\"></span> in the Stiftung Kurt<span class=\"_ _e\"></span>-Sanderling-Akademie des Konzerthausorchesters foundation (Be<span class=\"_ _e\"></span>rlin, Germany). Other in<span class=\"_ _2\"></span>vestments are measured at fair value. At each reporting date, a re<span class=\"_ _e\"></span>-measurement is performed to re-evaluate these investments. Any deviation from<span class=\"_ _2\"></span> the previous period is recorded under other comprehensive income. T<span class=\"_ _e\"></span>he reassessment 2022 resulted in an increase of \u20ac32.7 million based<span class=\"_ _2\"></span> on a total fair value of \u20ac75.4 million. The remaining balance is related to JAO (\u20ac0.3 million).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Derivatives<span class=\"ls1d\">: s</span>ince 2021, 50Hertz applies hedge a<span class=\"_ _2\"></span>ccounting for the purpose of reducing the risk of fluctuations in the<span class=\"_ _e\"></span> expected amount of grid losses.<span class=\"_ _2\"></span> Due to the drop in energy prices in the last qu<span class=\"_ _e\"></span>arter of the year<span class=\"_ _2\"></span>, the fair value of these contracts decreased t<span class=\"_ _e\"></span><span class=\"ff42\">o \u20ac154.4 million </span>(current derivatives). Lo<span class=\"_ _2\"></span>ng term contracts shows a negative fair value. T<span class=\"_ _e\"></span>his evolution explains an overall decrease of <span class=\"ff42\">\u20ac</span><span class=\"ls5b\">201<span class=\"ls1d\">.3</span></span> million <span class=\"_ _e\"></span>(-\u20ac39.4 million <span class=\"ff3f\">in long-term derivatives and -</span>\u20ac161.9 million <span class=\"ff3f\">in short-term derivatives)<span class=\"ls1d\">. </span>This decrease is partly offset by the positive value </span>accounted for<span class=\"_ _2\"></span> in Belgium in connection with the pre-<span class=\"_ _e\"></span>hedging of probable forecast debt transactions (bonds issuance). The fair value of these derivatives amounted<span class=\"_ _2\"></span> to \u20ac65.3 million. <span class=\"ff3f\">S<span class=\"_ _e\"></span>ee Note 8.1 for more info on these derivatives. </span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherNoncurrentAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__69-1": {
   "value": "6.5. <span class=\"_ _87\"> </span>Equity-accounted investees The movements in t<span class=\"_ _2\"></span>he equity-accounted investees are su<span class=\"_ _e\"></span>mmarised as fo<span class=\"_ _2\"></span>llows: <span class=\"_ _e\"></span> (in \u20ac<span class=\"ff40\"> <span class=\"_ _2\"></span>million)<span class=\"_ _e\"></span> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Equity<span class=\"_ _2\"></span> accounted investees (opening balance)<span class=\"_ _e\"></span> 309.6 323.1 Profit for the ye<span class=\"_ _2\"></span>ar<span class=\"_ _e\"></span> 39.5 49.<span class=\"ls0\">4 </span>Dividends re<span class=\"_ _2\"></span>ceived by the Group (34.2) (30.9) Capital re<span class=\"_ _2\"></span>payment of equity accounted investee<span class=\"_ _e\"></span> (53.8) (30.5) Investment in e<span class=\"_ _2\"></span>quity accounted investee<span class=\"_ _e\"></span> Sale of equ<span class=\"_ _2\"></span>ity accounted investee<span class=\"_ _e\"></span> (1.5) Equity<span class=\"_ _2\"></span> accounted investees (closing balance)<span class=\"_ _e\"></span> 261.2 309.6 Of which joint <span class=\"_ _2\"></span>ventures<span class=\"_ _e\"></span> 243.4 292.1 Of which associa<span class=\"_ _2\"></span>tes<span class=\"_ _e\"></span> 17.8 17.5 Details are<span class=\"_ _2\"></span> given in the subchapters below. <span class=\"_ _e\"></span> 6.5.1. <span class=\"_ _5b\"></span>Jo<span class=\"_ _e\"></span>int ventures Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Nemo Lin<span class=\"_ _2\"></span>k Ltd<span class=\"_ _e\"></span> On 27 February <span class=\"_ _2\"></span>2015, Elia System Operator and National<span class=\"_ _e\"></span> Grid signed a jo<span class=\"_ _2\"></span>int venture agreement to build the Nemo Link Interconnector between Be<span class=\"_ _2\"></span>lgium and the UK. This project consists of subsea and underground cables connected to converter stati<span class=\"_ _e\"></span>ons and an electricity sub<span class=\"_ _2\"></span>stations in each country, allowing <span class=\"_ _e\"></span>electricity to flow in either d<span class=\"_ _2\"></span>irection between the two countries, s<span class=\"_ _e\"></span>o giving the UK and Belgium improved reliab<span class=\"_ _2\"></span>ility and access to electricity and sustainable generation. Each shareholder holds a 50% stake in Nemo<span class=\"_ _20\"></span> Lin<span class=\"_ _2\"></span>k Ltd, a UK company.<span class=\"_ _2\"></span> The interconnection was co<span class=\"_ _e\"></span>mmissioned in late<span class=\"_ _2\"></span> January 2019. <span class=\"_ _e\"></span> To finance th<span class=\"_ _2\"></span>e project both shareholders have provided funding to Nemo Link Ltd since 2016 via equity contributions and loans<span class=\"_ _e\"></span> (divided on a 50/50 basis). In June<span class=\"_ _2\"></span> 2019, the loans were incorpora<span class=\"_ _e\"></span>ted in the share capital (loan swap to equity).<span class=\"_ _e\"></span> In 2022, Nemo<span class=\"_ _2\"></span> Link Ltd reduced its share capital by <span class=\"ff42\">\u20ac107.<span class=\"_ _e\"></span>6 million</span> (<span class=\"ff42\">\u20ac61.0 million</span> in 2021). In addition to these capital reduction rounds, dividends totalling <span class=\"ff42\">\u20ac64.0 million</span> (<span class=\"ff42\">\u20ac58.0 million</span> in 2021) were paid out to its shareholders.  The fo<span class=\"_ _2\"></span>llowing table summarises the financial information of the joint venture, based on its IFRS financial statements and rec<span class=\"_ _e\"></span>onciliation with the carrying<span class=\"_ _2\"></span> amount for the group's interest in the co<span class=\"_ _e\"></span>nsolidated<span class=\"_ _2\"></span> financial statements.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Percentage o<span class=\"_ _2\"></span>wnership interest 50.0% 50.0% Non-current assets 591.3 617.4 -Current asse<span class=\"_ _2\"></span>ts 29.1 19.5 Non-current <span class=\"_ _2\"></span>liabilities 111.2 41.0 Curren<span class=\"_ _2\"></span>t liabilities<span class=\"_ _e\"></span> 22.3 11.6 Equity 486.9 584.2 Group's ca<span class=\"_ _2\"></span>rrying amount for the interest 243.4 292.1 Revenues and o<span class=\"_ _2\"></span>ther income 122.0 151.1 Total depre<span class=\"_ _2\"></span>ciation and amortisation<span class=\"_ _e\"></span> (27.1) (27.0) Other operating e<span class=\"_ _2\"></span>xpenses 2.9 (7.7) Net finance<span class=\"_ _2\"></span> costs<span class=\"_ _e\"></span> (5.6) (1.0) Profit before income t<span class=\"_ _2\"></span>ax 92.3 115.3 Income tax exp<span class=\"_ _2\"></span>ense<span class=\"_ _e\"></span> (18.1) (21.2) Profit for the ye<span class=\"_ _2\"></span>ar<span class=\"_ _e\"></span> 74.2 94.0 Total comprehensive<span class=\"_ _2\"></span> income for the year<span class=\"_ _e\"></span> 74.2 94.0 Group's share o<span class=\"_ _2\"></span>f profit for the year<span class=\"_ _e\"></span> 37.1 47.0 Dividends re<span class=\"_ _2\"></span>ceived by the Group 32.0 29.0 Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.5.2. <span class=\"_ _5b\"></span>Asso<span class=\"_ _e\"></span>ciates As <span class=\"ls5b\">of</span> 31 December 2022<span class=\"ls1d\">, t</span>he group has 2 associates, both being equity-<span class=\"_ _e\"></span>accounted investees.  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> group has a 22.2% stake in Coreso SA/NV. Coreso S<span class=\"_ _e\"></span>A/NV is a company that p<span class=\"_ _2\"></span>rovides coordination services aimed at </span></span>facilitating the secure o<span class=\"_ _2\"></span>peration of t<span class=\"_ _e\"></span>he high-voltage grid in several European countries.  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> group holds a 17.0% stake in HGRT <span class=\"ls27\">SAS</span>. HGRT SAS is a French company with a 49.0% stake in Epex Spot, the exchange </span></span>for po<span class=\"_ _2\"></span>wer spot trading in Germany, France, Austria, Switzerland, Luxembourg and (th<span class=\"_ _e\"></span>rough its 100% associate APX) the UK, Netherlands and Belgium<span class=\"_ _2\"></span>. As one of the founding partner<span class=\"_ _e\"></span>s of HGRT, the group has a 'golden share', giving it a minimum number of represen<span class=\"_ _2\"></span>tatives on <span class=\"ff42\">HGRT\u2019s</span> Board of Directors. This constitutes a significant influence and therefore HGRT is accounted for using the<span class=\"_ _2\"></span> equity method. In 2022, the <span class=\"_ _e\"></span><span class=\"ff42\">group received a dividend of \u20ac2.2</span> milli<span class=\"ff42\">on from HGRT (\u20ac1.9 million in 2021</span><span class=\"ls8f\">).<span class=\"_ _e\"></span></span> None of these compa<span class=\"_ _2\"></span>nies are listed on any public exchange.<span class=\"_ _e\"></span> The fo<span class=\"_ _2\"></span>llowing scope changes are to be reported:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">2022<span class=\"_ _2\"></span>: none </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">2021<span class=\"_ _2\"></span>: The investment in Enervalis NV (16,5%), a start-up <span class=\"_ _e\"></span>that develops innovative software for smart <span class=\"_ _2\"></span>control of ene<span class=\"_ _e\"></span>rgy sour<span class=\"_ _2\"></span>ces, </span></span>was sold in Apr<span class=\"_ _2\"></span>il 2021 resulting in a gain of \u20ac0.15 million<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>The fo<span class=\"_ _2\"></span>llowing table illustrates the summarise<span class=\"ls5b\">d </span>fi<span class=\"_ _e\"></span>nancial information of the group's investment in these companies, based on their respective<span class=\"_ _2\"></span> financial statements prepared in accordance with IFRS.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Coreso HGRT 2021<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Percentage o<span class=\"_ _2\"></span>wnership interest 22.2% 17.0% Non-current assets 8.2 96.5 Curren<span class=\"_ _2\"></span>t assets<span class=\"_ _e\"></span> 4.5 0.8 Curren<span class=\"_ _2\"></span>t liabilities<span class=\"_ _e\"></span> 8.2 0.0 Equity 4.5 97.3 Group's ca<span class=\"_ _2\"></span>rrying amount for the interest 1.0 16.5 Revenue 25.7 0.0 Other operating e<span class=\"_ _2\"></span>xpenses (24.6) 13.2 Profit before income t<span class=\"_ _2\"></span>ax 1.1 13.2 Income tax exp<span class=\"_ _2\"></span>ense<span class=\"_ _e\"></span> (0.4) (0.1) Profit for the ye<span class=\"_ _2\"></span>ar<span class=\"_ _e\"></span> 0.7 13.1 Total comprehensive<span class=\"_ _2\"></span> income for the year<span class=\"_ _e\"></span> 0.7 13.1 Group's share o<span class=\"_ _2\"></span>f profit for the year<span class=\"_ _e\"></span> 0.2 2.2 Dividends re<span class=\"_ _2\"></span>ceived by the Group 1.9 (in \u20ac million)<span class=\"ff40\"> </span>Coreso HGRT 2022<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>Percentage o<span class=\"_ _2\"></span>wnership interest 22.2% 17.0% Non-current assets 10.1 96.9 Curren<span class=\"_ _2\"></span>t assets<span class=\"_ _e\"></span> 3.1 0.7 Curren<span class=\"_ _2\"></span>t liabilities<span class=\"_ _e\"></span> 7.9 0.0 Equity 5.3 97.5 Group's ca<span class=\"_ _2\"></span>rrying amount for the interest 1.2 16.6 Revenue 28.3 0.0 Other operating e<span class=\"_ _2\"></span>xpenses (27.1) 13.4 Profit before income t<span class=\"_ _2\"></span>ax 1.3 13.4 Income tax exp<span class=\"_ _2\"></span>ense<span class=\"_ _e\"></span> (0.5) (0.1) Profit for the ye<span class=\"_ _2\"></span>ar<span class=\"_ _e\"></span> 0.8 13.2 Total comprehensive<span class=\"_ _2\"></span> income for the year<span class=\"_ _e\"></span> 0.8 13.2 Group's share o<span class=\"_ _2\"></span>f profit for the year<span class=\"_ _e\"></span> 0.2 2.2 Dividends re<span class=\"_ _2\"></span>ceived by the Group 2.2 Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.7.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Group structure </span>OVERVIEW OF GROUP STRUCTURE SUBSIDI<span class=\"_ _e\"></span>ARIES Elia Group SA/NV has direct and indire<span class=\"_ _2\"></span>ct control of the subsidiaries listed below.<span class=\"_ _e\"></span> Elia Grid International Pte L<span class=\"_ _2\"></span>td (Singapore) ceased its ope<span class=\"_ _e\"></span>rations in June 2022. A new subsid<span class=\"_ _2\"></span>iary has been created in Canada, Elia Grid Internationa<span class=\"_ _2\"></span>l Inc. This subsidiary will <span class=\"_ _e\"></span>coordinate the activities of Elia Grid Internationa<span class=\"_ _2\"></span>l in North America<span class=\"ls95\">. </span> All the entities keep their accounts in<span class=\"_ _2\"></span> euros and <span class=\"_ _e\"></span>have the same reporting date as Elia Group SA/NV. Country of<span class=\"_ _2\"></span> Name Headquarters Stake % establish<span class=\"_ _2\"></span>ment<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Subsid<span class=\"_ _2\"></span>iaries<span class=\"_ _e\"></span> Elia Transm<span class=\"_ _2\"></span>ission Belgium SA/NV Belgium  Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"ff3f\">  </span>99.99 99.99 Elia Asset SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>99.99 99.99 Elia Engineering<span class=\"_ _2\"></span> SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 100.00 Elia Re SA Luxembourg Rue de Merl 6<span class=\"_ _2\"></span>5, 2146 Luxembourg<span class=\"_ _e\"></span> 100.00 100.00 Elia Grid International SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Bussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>90.00 90.00 Elia Grid International Gm<span class=\"_ _2\"></span>BH<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 90.00 90.00 Al Akaria Plaza Olaya Str<span class=\"_ _2\"></span>eet, <span class=\"_ _e\"></span> Elia Grid International LL<span class=\"_ _2\"></span>C<span class=\"_ _e\"></span> Saudi Arabia Al Olaya Riyadh 1<span class=\"_ _2\"></span>1622 <span class=\"_ _e\"></span> 90.00 90.00 Elia Grid International Pte. <span class=\"_ _2\"></span>Ltd.<span class=\"_ _e\"></span> Singapore 20 Collyer Quay #09-01, Singapore 049319 - 90.00 Elia Grid International In<span class=\"_ _2\"></span>c.<span class=\"_ _e\"></span> Canada 1500<span class=\"ls0\">-850 2 ST SW, T2P0R8 Calgary </span>90.00 - Eurogrid International SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 100.00 Eurogrid GmbH  German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 80.00 80.00 50Hertz Tran<span class=\"_ _2\"></span>smission GmbH <span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 80.00 80.00 50Hertz O<span class=\"_ _2\"></span>ffshore GmbH  German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 80.00 80.00 Re.Alto-Energ<span class=\"_ _2\"></span>y BV/SRL<span class=\"_ _e\"></span> Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 100.00 Re.Alto-Energ<span class=\"_ _2\"></span>y GmbH<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Ratingstra\u00dfe 9<span class=\"_ _2\"></span>, 40213 Dusseldorf<span class=\"_ _e\"></span> 100.00 100.00 WindGrid SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 - Investments accounted fo<span class=\"_ _2\"></span>r using the equity-met<span class=\"_ _e\"></span>hod <span class=\"ff43\">\u2013</span> Joint Ventures Nemo Link Ltd. United Kingdom Strand 1-3, London WC2N 5EH 50.00 50.00 Investments accounted fo<span class=\"_ _2\"></span>r using the equity-met<span class=\"_ _e\"></span>hod <span class=\"ff43\">\u2013</span> Associates H.G.R.T S.A.S.  France 1 Terrasse Be<span class=\"_ _2\"></span>llini, 92919 La D\u00e9fense Cedex<span class=\"_ _e\"></span> 17.00 17.00 Coreso SA/NV Belgium Avenue de<span class=\"_ _2\"></span> Cortenbergh 71, 1000 Brussels<span class=\"_ _e\"></span> 22.16 22.16 Investments accounted fo<span class=\"_ _2\"></span>r using IFRS9 - o<span class=\"_ _e\"></span>ther shareholdings JAO SA Luxembourg 2, Rue de Bitbourg, 1273 Lu<span class=\"_ _2\"></span>xembourg Hamm<span class=\"_ _e\"></span> 7.20 7.20 European Energ<span class=\"_ _2\"></span>y Exchange (EEX)<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Augustusplatz<span class=\"_ _2\"></span> 9, 0409 Leipzig<span class=\"_ _e\"></span> 4.32 4.32 TSCNET Services Gm<span class=\"_ _2\"></span>bH<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Dingolfinger Strasse<span class=\"_ _2\"></span> 3, 81673 Munich<span class=\"_ _e\"></span> 5.36 5.36 Kurt-Sanderling-Akademie des Konzerthausorchester<span class=\"_ _2\"></span> Berlin<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Gendarmenmarkt<span class=\"_ _2\"></span>, 10117 Berlin<span class=\"_ _e\"></span> 8.32 8.32",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInterestsInOtherEntitiesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__68-1": {
   "value": "6.5. <span class=\"_ _87\"> </span>Equity-accounted investees The movements in t<span class=\"_ _2\"></span>he equity-accounted investees are su<span class=\"_ _e\"></span>mmarised as fo<span class=\"_ _2\"></span>llows: <span class=\"_ _e\"></span> (in \u20ac<span class=\"ff40\"> <span class=\"_ _2\"></span>million)<span class=\"_ _e\"></span> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Equity<span class=\"_ _2\"></span> accounted investees (opening balance)<span class=\"_ _e\"></span> 309.6 323.1 Profit for the ye<span class=\"_ _2\"></span>ar<span class=\"_ _e\"></span> 39.5 49.<span class=\"ls0\">4 </span>Dividends re<span class=\"_ _2\"></span>ceived by the Group (34.2) (30.9) Capital re<span class=\"_ _2\"></span>payment of equity accounted investee<span class=\"_ _e\"></span> (53.8) (30.5) Investment in e<span class=\"_ _2\"></span>quity accounted investee<span class=\"_ _e\"></span> Sale of equ<span class=\"_ _2\"></span>ity accounted investee<span class=\"_ _e\"></span> (1.5) Equity<span class=\"_ _2\"></span> accounted investees (closing balance)<span class=\"_ _e\"></span> 261.2 309.6 Of which joint <span class=\"_ _2\"></span>ventures<span class=\"_ _e\"></span> 243.4 292.1 Of which associa<span class=\"_ _2\"></span>tes<span class=\"_ _e\"></span> 17.8 17.5 Details are<span class=\"_ _2\"></span> given in the subchapters below.TRANSACTIONS WITH JOINT VENTURES AND A<span class=\"_ _2\"></span>SSOCIATES<span class=\"_ _e\"></span> Transa<span class=\"_ _2\"></span>ctions between the Company and subsidiaries that are related parties were eliminated during consolidation and therefore<span class=\"_ _e\"></span> are not recogn<span class=\"_ _2\"></span>ised in this note.  Transa<span class=\"_ _2\"></span>ctions with joint ventures and associates <span class=\"_ _e\"></span>(as defined in Note 7.1.) were not eliminated, so details of these transactions are shown below: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Transactions with joint vent<span class=\"_ _2\"></span>ures and associates (4.0) (4.5) Sales of goods 1.6  0.1  Purchases o<span class=\"_ _2\"></span>f goods<span class=\"_ _e\"></span> (5.6) (4.6) Outstanding ba<span class=\"_ _2\"></span>lances with joint ventures and associates<span class=\"_ _e\"></span> (0.4) (0.9) Trade deb<span class=\"_ _2\"></span>tors<span class=\"_ _e\"></span> (0.4) (0.7) Trade deb<span class=\"_ _2\"></span>ts 0.0  (0.2) In 2021 and<span class=\"_ _2\"></span> 2022, entities of the Elia Group had tra<span class=\"_ _e\"></span>nsactions with Nemo Link Ltd. and Coreso SA/NV. The sale of goods relates to corporate services (<span class=\"_ _2\"></span>SLAs) rendered by Elia to Ne<span class=\"_ _e\"></span>mo Link Ltd an<span class=\"_ _2\"></span>d Coreso SA/NV<span class=\"_ _e\"></span>. Nemo L<span class=\"_ _2\"></span>ink Ltd. also rents a building (Herdersbrug) from Elia Asset SA/NV (see<span class=\"_ _2\"></span> also Note 6.18). Purchases o<span class=\"_ _e\"></span>f goods mostly relates to service<span class=\"_ _2\"></span>s ren<span class=\"_ _e\"></span>dered by Coreso SA/NV to the group.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInvestmentsAccountedForUsingEquityMethodExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__76": {
   "value": "6.5.1. <span class=\"_ _5b\"></span>Jo<span class=\"_ _e\"></span>int ventures Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Nemo Lin<span class=\"_ _2\"></span>k Ltd<span class=\"_ _e\"></span> On 27 February <span class=\"_ _2\"></span>2015, Elia System Operator and National<span class=\"_ _e\"></span> Grid signed a jo<span class=\"_ _2\"></span>int venture agreement to build the Nemo Link Interconnector between Be<span class=\"_ _2\"></span>lgium and the UK. This project consists of subsea and underground cables connected to converter stati<span class=\"_ _e\"></span>ons and an electricity sub<span class=\"_ _2\"></span>stations in each country, allowing <span class=\"_ _e\"></span>electricity to flow in either d<span class=\"_ _2\"></span>irection between the two countries, s<span class=\"_ _e\"></span>o giving the UK and Belgium improved reliab<span class=\"_ _2\"></span>ility and access to electricity and sustainable generation. Each shareholder holds a 50% stake in Nemo<span class=\"_ _20\"></span> Lin<span class=\"_ _2\"></span>k Ltd, a UK company.<span class=\"_ _2\"></span> The interconnection was co<span class=\"_ _e\"></span>mmissioned in late<span class=\"_ _2\"></span> January 2019. <span class=\"_ _e\"></span> To finance th<span class=\"_ _2\"></span>e project both shareholders have provided funding to Nemo Link Ltd since 2016 via equity contributions and loans<span class=\"_ _e\"></span> (divided on a 50/50 basis). In June<span class=\"_ _2\"></span> 2019, the loans were incorpora<span class=\"_ _e\"></span>ted in the share capital (loan swap to equity).<span class=\"_ _e\"></span> In 2022, Nemo<span class=\"_ _2\"></span> Link Ltd reduced its share capital by <span class=\"ff42\">\u20ac107.<span class=\"_ _e\"></span>6 million</span> (<span class=\"ff42\">\u20ac61.0 million</span> in 2021). In addition to these capital reduction rounds, dividends totalling <span class=\"ff42\">\u20ac64.0 million</span> (<span class=\"ff42\">\u20ac58.0 million</span> in 2021) were paid out to its shareholders.  The fo<span class=\"_ _2\"></span>llowing table summarises the financial information of the joint venture, based on its IFRS financial statements and rec<span class=\"_ _e\"></span>onciliation with the carrying<span class=\"_ _2\"></span> amount for the group's interest in the co<span class=\"_ _e\"></span>nsolidated<span class=\"_ _2\"></span> financial statements.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Percentage o<span class=\"_ _2\"></span>wnership interest 50.0% 50.0% Non-current assets 591.3 617.4 -Current asse<span class=\"_ _2\"></span>ts 29.1 19.5 Non-current <span class=\"_ _2\"></span>liabilities 111.2 41.0 Curren<span class=\"_ _2\"></span>t liabilities<span class=\"_ _e\"></span> 22.3 11.6 Equity 486.9 584.2 Group's ca<span class=\"_ _2\"></span>rrying amount for the interest 243.4 292.1 Revenues and o<span class=\"_ _2\"></span>ther income 122.0 151.1 Total depre<span class=\"_ _2\"></span>ciation and amortisation<span class=\"_ _e\"></span> (27.1) (27.0) Other operating e<span class=\"_ _2\"></span>xpenses 2.9 (7.7) Net finance<span class=\"_ _2\"></span> costs<span class=\"_ _e\"></span> (5.6) (1.0) Profit before income t<span class=\"_ _2\"></span>ax 92.3 115.3 Income tax exp<span class=\"_ _2\"></span>ense<span class=\"_ _e\"></span> (18.1) (21.2) Profit for the ye<span class=\"_ _2\"></span>ar<span class=\"_ _e\"></span> 74.2 94.0 Total comprehensive<span class=\"_ _2\"></span> income for the year<span class=\"_ _e\"></span> 74.2 94.0 Group's share o<span class=\"_ _2\"></span>f profit for the year<span class=\"_ _e\"></span> 37.1 47.0 Dividends re<span class=\"_ _2\"></span>ceived by the Group 32.0 29.0 Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfJointVenturesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__77": {
   "value": "6.5.2. <span class=\"_ _5b\"></span>Asso<span class=\"_ _e\"></span>ciates As <span class=\"ls5b\">of</span> 31 December 2022<span class=\"ls1d\">, t</span>he group has 2 associates, both being equity-<span class=\"_ _e\"></span>accounted investees.  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> group has a 22.2% stake in Coreso SA/NV. Coreso S<span class=\"_ _e\"></span>A/NV is a company that p<span class=\"_ _2\"></span>rovides coordination services aimed at </span></span>facilitating the secure o<span class=\"_ _2\"></span>peration of t<span class=\"_ _e\"></span>he high-voltage grid in several European countries.  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> group holds a 17.0% stake in HGRT <span class=\"ls27\">SAS</span>. HGRT SAS is a French company with a 49.0% stake in Epex Spot, the exchange </span></span>for po<span class=\"_ _2\"></span>wer spot trading in Germany, France, Austria, Switzerland, Luxembourg and (th<span class=\"_ _e\"></span>rough its 100% associate APX) the UK, Netherlands and Belgium<span class=\"_ _2\"></span>. As one of the founding partner<span class=\"_ _e\"></span>s of HGRT, the group has a 'golden share', giving it a minimum number of represen<span class=\"_ _2\"></span>tatives on <span class=\"ff42\">HGRT\u2019s</span> Board of Directors. This constitutes a significant influence and therefore HGRT is accounted for using the<span class=\"_ _2\"></span> equity method. In 2022, the <span class=\"_ _e\"></span><span class=\"ff42\">group received a dividend of \u20ac2.2</span> milli<span class=\"ff42\">on from HGRT (\u20ac1.9 million in 2021</span><span class=\"ls8f\">).<span class=\"_ _e\"></span></span> None of these compa<span class=\"_ _2\"></span>nies are listed on any public exchange.<span class=\"_ _e\"></span> The fo<span class=\"_ _2\"></span>llowing scope changes are to be reported:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">2022<span class=\"_ _2\"></span>: none </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">2021<span class=\"_ _2\"></span>: The investment in Enervalis NV (16,5%), a start-up <span class=\"_ _e\"></span>that develops innovative software for smart <span class=\"_ _2\"></span>control of ene<span class=\"_ _e\"></span>rgy sour<span class=\"_ _2\"></span>ces, </span></span>was sold in Apr<span class=\"_ _2\"></span>il 2021 resulting in a gain of \u20ac0.15 million<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>The fo<span class=\"_ _2\"></span>llowing table illustrates the summarise<span class=\"ls5b\">d </span>fi<span class=\"_ _e\"></span>nancial information of the group's investment in these companies, based on their respective<span class=\"_ _2\"></span> financial statements prepared in accordance with IFRS.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Coreso HGRT 2021<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Percentage o<span class=\"_ _2\"></span>wnership interest 22.2% 17.0% Non-current assets 8.2 96.5 Curren<span class=\"_ _2\"></span>t assets<span class=\"_ _e\"></span> 4.5 0.8 Curren<span class=\"_ _2\"></span>t liabilities<span class=\"_ _e\"></span> 8.2 0.0 Equity 4.5 97.3 Group's ca<span class=\"_ _2\"></span>rrying amount for the interest 1.0 16.5 Revenue 25.7 0.0 Other operating e<span class=\"_ _2\"></span>xpenses (24.6) 13.2 Profit before income t<span class=\"_ _2\"></span>ax 1.1 13.2 Income tax exp<span class=\"_ _2\"></span>ense<span class=\"_ _e\"></span> (0.4) (0.1) Profit for the ye<span class=\"_ _2\"></span>ar<span class=\"_ _e\"></span> 0.7 13.1 Total comprehensive<span class=\"_ _2\"></span> income for the year<span class=\"_ _e\"></span> 0.7 13.1 Group's share o<span class=\"_ _2\"></span>f profit for the year<span class=\"_ _e\"></span> 0.2 2.2 Dividends re<span class=\"_ _2\"></span>ceived by the Group 1.9 (in \u20ac million)<span class=\"ff40\"> </span>Coreso HGRT 2022<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>Percentage o<span class=\"_ _2\"></span>wnership interest 22.2% 17.0% Non-current assets 10.1 96.9 Curren<span class=\"_ _2\"></span>t assets<span class=\"_ _e\"></span> 3.1 0.7 Curren<span class=\"_ _2\"></span>t liabilities<span class=\"_ _e\"></span> 7.9 0.0 Equity 5.3 97.5 Group's ca<span class=\"_ _2\"></span>rrying amount for the interest 1.2 16.6 Revenue 28.3 0.0 Other operating e<span class=\"_ _2\"></span>xpenses (27.1) 13.4 Profit before income t<span class=\"_ _2\"></span>ax 1.3 13.4 Income tax exp<span class=\"_ _2\"></span>ense<span class=\"_ _e\"></span> (0.5) (0.1) Profit for the ye<span class=\"_ _2\"></span>ar<span class=\"_ _e\"></span> 0.8 13.2 Total comprehensive<span class=\"_ _2\"></span> income for the year<span class=\"_ _e\"></span> 0.8 13.2 Group's share o<span class=\"_ _2\"></span>f profit for the year<span class=\"_ _e\"></span> 0.2 2.2 Dividends re<span class=\"_ _2\"></span>ceived by the Group 2.2 Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSignificantInvestmentsInAssociatesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__75": {
   "value": "6.6. <span class=\"_ _87\"> </span>Other financial assets (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Immedia<span class=\"_ _2\"></span>tely claimable deposits<span class=\"_ _e\"></span> 7.0 7.0 Reimbursemen<span class=\"_ _2\"></span>t rights<span class=\"_ _e\"></span> 33.7 46.2 Other shareholding<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> 75.7 43.8 Other 0.8 Non-current deriva<span class=\"_ _2\"></span>tives 0.0 39.4 Other financial <span class=\"_ _2\"></span>assets (non-current)<span class=\"_ _e\"></span> 117.2 136.3 Curren<span class=\"_ _2\"></span>t derivatives<span class=\"_ _e\"></span> 219.7 316.2 Other financial <span class=\"_ _2\"></span>assets (current) 219.7 316.2 Other financial <span class=\"_ _2\"></span>assets<span class=\"_ _e\"></span> 336.9 452.5 The total other f<span class=\"_ _2\"></span>inancial assets decreased by \u20ac115.6 million compared with the previous <span class=\"ff3f\">yea<span class=\"_ _e\"></span>r. </span>Immedia<span class=\"_ _2\"></span>tely claimable deposits are measured at fair value. The risk profile of these investments is discussed in Note 8.1. <span class=\"_ _e\"></span>The value as at 31 December 2022 is stab<span class=\"_ _2\"></span>le compared to 2021.<span class=\"_ _e\"></span> Re<span class=\"ls0\">imbur<span class=\"_ _2\"></span>sement rights are linked to the obligations regard<span class=\"_ _e\"></span>ing (i) the retired employees falling under sp<span class=\"_ _2\"></span>ecific benefit <span class=\"_ _e\"></span>schemes (<span class=\"_ _2\"></span>Scheme<span class=\"_ _e\"></span> <span class=\"ls27\">B </span></span>- unfunded<span class=\"_ _2\"></span> plan); <span class=\"ls5b\">an</span>d <span class=\"_ _e\"></span>for (ii) health plan and reduced energy pricing plans for retired staff members. See Note 6.14<span class=\"_ _e\"></span><span class=\"ff42\">: \u2018Employee benefits\u2019. </span>The reimbursem<span class=\"_ _2\"></span>ent rights are recoverable through the regulated tariffs. The following principle applies: all incurred pension c<span class=\"_ _e\"></span>osts for 'Scheme B' retired<span class=\"_ _2\"></span> employees and the costs linked to healthcare and r<span class=\"_ _e\"></span>educed energy pricing plans for retired Elia staff members are defined by the<span class=\"_ _2\"></span> regulator (CREG) as non-controllable expe<span class=\"_ _e\"></span>nses that are recoverable through the regulatory tariffs. The decrease in the carrying<span class=\"_ _2\"></span> value of this asset is disclosed in Note 6.14<span class=\"ff42\">: \u2018Employee benefits\u2019</span> and mainly explained by the change i<span class=\"_ _e\"></span>n discount rate. Considerin<span class=\"_ _2\"></span>g the nature (regulatory asset) of these financi<span class=\"_ _e\"></span>al assets, they are not considered to be at risk o<span class=\"_ _2\"></span>f impairm<span class=\"_ _e\"></span>ent.  Other shareholding<span class=\"_ _2\"></span>s: t<span class=\"ls5b\">he </span>g<span class=\"_ _e\"></span>roup holds 5.3% (at 100%) of the shares in European Energy Exchange (EEX), Leipzig, Germany, for a tot<span class=\"_ _e\"></span>al value of \u20ac42.7<span class=\"_ _2\"></span> million as of the reporting date. These shares are disclosed under Other shareholdings <span class=\"_ _e\"></span><span class=\"ff3f\">in addition to <span class=\"_ _e\"></span>an 8.0% (at 100<span class=\"_ _2\"></span>%) </span>shareholding in<span class=\"_ _2\"></span> JAO Joint Allocation Office SA, a 6.7% (at 100%) shareholding in TSCNET Services GmbH (Munich, Germany) and a<span class=\"_ _e\"></span> 10.4% (at 100%) shareholding<span class=\"_ _2\"></span> in the Stiftung Kurt<span class=\"_ _e\"></span>-Sanderling-Akademie des Konzerthausorchesters foundation (Be<span class=\"_ _e\"></span>rlin, Germany). Other in<span class=\"_ _2\"></span>vestments are measured at fair value. At each reporting date, a re<span class=\"_ _e\"></span>-measurement is performed to re-evaluate these investments. Any deviation from<span class=\"_ _2\"></span> the previous period is recorded under other comprehensive income. T<span class=\"_ _e\"></span>he reassessment 2022 resulted in an increase of \u20ac32.7 million based<span class=\"_ _2\"></span> on a total fair value of \u20ac75.4 million. The remaining balance is related to JAO (\u20ac0.3 million).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Derivatives<span class=\"ls1d\">: s</span>ince 2021, 50Hertz applies hedge a<span class=\"_ _2\"></span>ccounting for the purpose of reducing the risk of fluctuations in the<span class=\"_ _e\"></span> expected amount of grid losses.<span class=\"_ _2\"></span> Due to the drop in energy prices in the last qu<span class=\"_ _e\"></span>arter of the year<span class=\"_ _2\"></span>, the fair value of these contracts decreased t<span class=\"_ _e\"></span><span class=\"ff42\">o \u20ac154.4 million </span>(current derivatives). Lo<span class=\"_ _2\"></span>ng term contracts shows a negative fair value. T<span class=\"_ _e\"></span>his evolution explains an overall decrease of <span class=\"ff42\">\u20ac</span><span class=\"ls5b\">201<span class=\"ls1d\">.3</span></span> million <span class=\"_ _e\"></span>(-\u20ac39.4 million <span class=\"ff3f\">in long-term derivatives and -</span>\u20ac161.9 million <span class=\"ff3f\">in short-term derivatives)<span class=\"ls1d\">. </span>This decrease is partly offset by the positive value </span>accounted for<span class=\"_ _2\"></span> in Belgium in connection with the pre-<span class=\"_ _e\"></span>hedging of probable forecast debt transactions (bonds issuance). The fair value of these derivatives amounted<span class=\"_ _2\"></span> to \u20ac65.3 million. <span class=\"ff3f\">S<span class=\"_ _e\"></span>ee Note 8.1 for more info on these derivatives. </span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInvestmentsOtherThanInvestmentsAccountedForUsingEquityMethodExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__73-1": {
   "value": "6.6. <span class=\"_ _87\"> </span>Other financial assets (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Immedia<span class=\"_ _2\"></span>tely claimable deposits<span class=\"_ _e\"></span> 7.0 7.0 Reimbursemen<span class=\"_ _2\"></span>t rights<span class=\"_ _e\"></span> 33.7 46.2 Other shareholding<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> 75.7 43.8 Other 0.8 Non-current deriva<span class=\"_ _2\"></span>tives 0.0 39.4 Other financial <span class=\"_ _2\"></span>assets (non-current)<span class=\"_ _e\"></span> 117.2 136.3 Curren<span class=\"_ _2\"></span>t derivatives<span class=\"_ _e\"></span> 219.7 316.2 Other financial <span class=\"_ _2\"></span>assets (current) 219.7 316.2 Other financial <span class=\"_ _2\"></span>assets<span class=\"_ _e\"></span> 336.9 452.5 The total other f<span class=\"_ _2\"></span>inancial assets decreased by \u20ac115.6 million compared with the previous <span class=\"ff3f\">yea<span class=\"_ _e\"></span>r. </span>Immedia<span class=\"_ _2\"></span>tely claimable deposits are measured at fair value. The risk profile of these investments is discussed in Note 8.1. <span class=\"_ _e\"></span>The value as at 31 December 2022 is stab<span class=\"_ _2\"></span>le compared to 2021.<span class=\"_ _e\"></span> Re<span class=\"ls0\">imbur<span class=\"_ _2\"></span>sement rights are linked to the obligations regard<span class=\"_ _e\"></span>ing (i) the retired employees falling under sp<span class=\"_ _2\"></span>ecific benefit <span class=\"_ _e\"></span>schemes (<span class=\"_ _2\"></span>Scheme<span class=\"_ _e\"></span> <span class=\"ls27\">B </span></span>- unfunded<span class=\"_ _2\"></span> plan); <span class=\"ls5b\">an</span>d <span class=\"_ _e\"></span>for (ii) health plan and reduced energy pricing plans for retired staff members. See Note 6.14<span class=\"_ _e\"></span><span class=\"ff42\">: \u2018Employee benefits\u2019. </span>The reimbursem<span class=\"_ _2\"></span>ent rights are recoverable through the regulated tariffs. The following principle applies: all incurred pension c<span class=\"_ _e\"></span>osts for 'Scheme B' retired<span class=\"_ _2\"></span> employees and the costs linked to healthcare and r<span class=\"_ _e\"></span>educed energy pricing plans for retired Elia staff members are defined by the<span class=\"_ _2\"></span> regulator (CREG) as non-controllable expe<span class=\"_ _e\"></span>nses that are recoverable through the regulatory tariffs. The decrease in the carrying<span class=\"_ _2\"></span> value of this asset is disclosed in Note 6.14<span class=\"ff42\">: \u2018Employee benefits\u2019</span> and mainly explained by the change i<span class=\"_ _e\"></span>n discount rate. Considerin<span class=\"_ _2\"></span>g the nature (regulatory asset) of these financi<span class=\"_ _e\"></span>al assets, they are not considered to be at risk o<span class=\"_ _2\"></span>f impairm<span class=\"_ _e\"></span>ent.  Other shareholding<span class=\"_ _2\"></span>s: t<span class=\"ls5b\">he </span>g<span class=\"_ _e\"></span>roup holds 5.3% (at 100%) of the shares in European Energy Exchange (EEX), Leipzig, Germany, for a tot<span class=\"_ _e\"></span>al value of \u20ac42.7<span class=\"_ _2\"></span> million as of the reporting date. These shares are disclosed under Other shareholdings <span class=\"_ _e\"></span><span class=\"ff3f\">in addition to <span class=\"_ _e\"></span>an 8.0% (at 100<span class=\"_ _2\"></span>%) </span>shareholding in<span class=\"_ _2\"></span> JAO Joint Allocation Office SA, a 6.7% (at 100%) shareholding in TSCNET Services GmbH (Munich, Germany) and a<span class=\"_ _e\"></span> 10.4% (at 100%) shareholding<span class=\"_ _2\"></span> in the Stiftung Kurt<span class=\"_ _e\"></span>-Sanderling-Akademie des Konzerthausorchesters foundation (Be<span class=\"_ _e\"></span>rlin, Germany). Other in<span class=\"_ _2\"></span>vestments are measured at fair value. At each reporting date, a re<span class=\"_ _e\"></span>-measurement is performed to re-evaluate these investments. Any deviation from<span class=\"_ _2\"></span> the previous period is recorded under other comprehensive income. T<span class=\"_ _e\"></span>he reassessment 2022 resulted in an increase of \u20ac32.7 million based<span class=\"_ _2\"></span> on a total fair value of \u20ac75.4 million. The remaining balance is related to JAO (\u20ac0.3 million).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Derivatives<span class=\"ls1d\">: s</span>ince 2021, 50Hertz applies hedge a<span class=\"_ _2\"></span>ccounting for the purpose of reducing the risk of fluctuations in the<span class=\"_ _e\"></span> expected amount of grid losses.<span class=\"_ _2\"></span> Due to the drop in energy prices in the last qu<span class=\"_ _e\"></span>arter of the year<span class=\"_ _2\"></span>, the fair value of these contracts decreased t<span class=\"_ _e\"></span><span class=\"ff42\">o \u20ac154.4 million </span>(current derivatives). Lo<span class=\"_ _2\"></span>ng term contracts shows a negative fair value. T<span class=\"_ _e\"></span>his evolution explains an overall decrease of <span class=\"ff42\">\u20ac</span><span class=\"ls5b\">201<span class=\"ls1d\">.3</span></span> million <span class=\"_ _e\"></span>(-\u20ac39.4 million <span class=\"ff3f\">in long-term derivatives and -</span>\u20ac161.9 million <span class=\"ff3f\">in short-term derivatives)<span class=\"ls1d\">. </span>This decrease is partly offset by the positive value </span>accounted for<span class=\"_ _2\"></span> in Belgium in connection with the pre-<span class=\"_ _e\"></span>hedging of probable forecast debt transactions (bonds issuance). The fair value of these derivatives amounted<span class=\"_ _2\"></span> to \u20ac65.3 million. <span class=\"ff3f\">S<span class=\"_ _e\"></span>ee Note 8.1 for more info on these derivatives. </span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.9. <span class=\"_ _87\"> </span>Current trade and other receivables, deferred charges and accrue<span class=\"_ _2\"></span>d revenues<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Contract assets 0.9 2.9 Trade rece<span class=\"_ _2\"></span>ivables<span class=\"_ _e\"></span> 748.7 716.5 Advance pa<span class=\"_ _2\"></span>yments<span class=\"_ _e\"></span> 1.9 1.0 Levies 80<span class=\"ls0\">.5 </span>36.6 VAT and other t<span class=\"_ _2\"></span>axes<span class=\"_ _e\"></span> 145.6 79.1 Other 2<span class=\"ls5b\">28</span>.7 25.1 Trade and other receiv<span class=\"_ _2\"></span>ables 1,206.2 861.3 Deferred charges 20.2 18.1 Accrued interests 4.9 Deferred charges and<span class=\"_ _2\"></span> accrued revenues<span class=\"_ _e\"></span> 25.1 18.1 Total 1,231.4 879.4 The total current <span class=\"_ _2\"></span>trade and other receivables, deferred charges and <span class=\"ff42\">acc<span class=\"_ _e\"></span>rued revenues increased by \u20ac352.0 million compared with the </span>previous <span class=\"_ _2\"></span>year. This is mainly explained by the cash collateral reported by the German segment for a total of \u20ac239.0 million a<span class=\"_ _e\"></span><span class=\"ff3f\">nd the </span>higher amount of <span class=\"_ _2\"></span>trade receivables and levies in a context of<span class=\"_ _e\"></span> rising prices. Contract assets are ma<span class=\"_ _2\"></span>inly related to<span class=\"_ _e\"></span> EGI's business and transmission system operations. The position decreased from <span class=\"ff42\">\u20ac2.9 million</span> in the previous year <span class=\"ff42\">to \u20ac0.9 million at <span class=\"_ _2\"></span>year<span class=\"ff3f\">-<span class=\"ls5b\">end.<span class=\"_ _e\"></span></span> </span></span>Trade rece<span class=\"_ _2\"></span>ivables are non-interest<span class=\"_ _e\"></span>-bearing and genera<span class=\"_ _2\"></span>lly have payment terms of 15<span class=\"_ _e\"></span> to 30 days. The increase is driven by both Belgian<span class=\"_ _2\"></span> and German<span class=\"_ _2\"></span> segments against a background of high activity and a significant increase in energy prices.<span class=\"_ _e\"></span> The increase in the le<span class=\"_ _2\"></span>vies is mainly attributable to Germany<span class=\"_ _e\"></span> <span class=\"ff42\">where the offshore receivable position rose from \u20ac20.9 million to<span class=\"_ _2\"></span> \u20ac6<span class=\"_ _e\"></span><span class=\"ff3f\">8.9 </span></span>mi<span class=\"ls1c\">ll<span class=\"ls0\">ion at year end in 2022. </span></span>\u2018Other receivab<span class=\"_ _2\"></span>les\u2019 mainly relate to <span class=\"ff3f\">the margin calls <span class=\"ls57\">(a</span>dvances received or paid as part of co<span class=\"_ _2\"></span>llateralization agreeme<span class=\"_ _e\"></span>nts set up by the </span>group<span class=\"_ _2\"></span> to manage counterparty risk on commodity transact<span class=\"_ _e\"></span>ions) of the German segments <span class=\"ff42\">(\u20ac239 million)</span>. The group<span class=\"_ _2\"></span>'s exposure to credit and currency risks, and impairment losses related to trade receivables are shown in Note<span class=\"_ _e\"></span> 8.1. At 31 December, <span class=\"_ _2\"></span>the ageing analysis of trade receiv<span class=\"_ _e\"></span>ables is as follows: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Not past due 639.6 687.4 Past due 0-30 days 75.6 15.1 Past due 3<span class=\"_ _2\"></span>1-60 days<span class=\"_ _e\"></span> 29.3 2.4 Past due 6<span class=\"_ _2\"></span>1 days <span class=\"_ _e\"></span>- one year 1.8 11.1 Past due o<span class=\"_ _2\"></span>ne year - two years 2.8 2.1 Total (e<span class=\"_ _2\"></span>xcl. impairm<span class=\"_ _e\"></span>ent) 749.1 718.1 Doubtful amounts 202.2 201.4 Amounts write-offs (201.7) (200.8) Allowance for e<span class=\"_ _2\"></span>xpected credit losses<span class=\"_ _e\"></span> (0.9) (2.1) Total 748.7 716.5 See Note 8.1 for<span class=\"_ _2\"></span> a detailed analysis of the credit risk incur<span class=\"_ _e\"></span>red in connection with these trade receiva<span class=\"_ _2\"></span>bles.<span class=\"_ _20\"></span> Considerin<span class=\"_ _2\"></span>g the nature (as regulatory assets) and/or the risk profile of the counterparties (Belgian/German state) of the mos<span class=\"_ _e\"></span>t significant other receiva<span class=\"_ _2\"></span>bles, there is a low impairment risk and thus i<span class=\"_ _e\"></span>t is not needed<span class=\"_ _2\"></span> to record a loss allowance.<span class=\"_ _e\"></span><span class=\"ff40\"> </span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherCurrentAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__78": {
   "value": "6.8. <span class=\"_ _87\"> </span>Inventories (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Raw mater<span class=\"_ _2\"></span>ials and consumables<span class=\"_ _e\"></span> 37.4 35.6 Work in pr<span class=\"_ _2\"></span>ogress 0.9 1.9 Write-down<span class=\"_ _2\"></span>s (16.7) (15.9) Total 21.6 21.6 The warehou<span class=\"_ _2\"></span>se primarily stores replacement and spare p<span class=\"_ _e\"></span>arts for maintenance and repair work carried out along the group's high-voltage substation<span class=\"_ _2\"></span>s, overhead lines and underground cables.<span class=\"_ _e\"></span> The va<span class=\"_ _2\"></span>lue of inventories remains stable and limited compared to December 31, 2021.<span class=\"_ _e\"></span> Write-down<span class=\"_ _2\"></span>s are recorded following the non-utilisatio<span class=\"_ _e\"></span>n of stock items based on the<span class=\"_ _2\"></span>ir underlying rotation. These wer<span class=\"_ _e\"></span>e slightly higher than in <span class=\"ls5b\">2021</span>. Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInventoriesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__83-1": {
   "value": "6.9. <span class=\"_ _87\"> </span>Current trade and other receivables, deferred charges and accrue<span class=\"_ _2\"></span>d revenues<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Contract assets 0.9 2.9 Trade rece<span class=\"_ _2\"></span>ivables<span class=\"_ _e\"></span> 748.7 716.5 Advance pa<span class=\"_ _2\"></span>yments<span class=\"_ _e\"></span> 1.9 1.0 Levies 80<span class=\"ls0\">.5 </span>36.6 VAT and other t<span class=\"_ _2\"></span>axes<span class=\"_ _e\"></span> 145.6 79.1 Other 2<span class=\"ls5b\">28</span>.7 25.1 Trade and other receiv<span class=\"_ _2\"></span>ables 1,206.2 861.3 Deferred charges 20.2 18.1 Accrued interests 4.9 Deferred charges and<span class=\"_ _2\"></span> accrued revenues<span class=\"_ _e\"></span> 25.1 18.1 Total 1,231.4 879.4 The total current <span class=\"_ _2\"></span>trade and other receivables, deferred charges and <span class=\"ff42\">acc<span class=\"_ _e\"></span>rued revenues increased by \u20ac352.0 million compared with the </span>previous <span class=\"_ _2\"></span>year. This is mainly explained by the cash collateral reported by the German segment for a total of \u20ac239.0 million a<span class=\"_ _e\"></span><span class=\"ff3f\">nd the </span>higher amount of <span class=\"_ _2\"></span>trade receivables and levies in a context of<span class=\"_ _e\"></span> rising prices. Contract assets are ma<span class=\"_ _2\"></span>inly related to<span class=\"_ _e\"></span> EGI's business and transmission system operations. The position decreased from <span class=\"ff42\">\u20ac2.9 million</span> in the previous year <span class=\"ff42\">to \u20ac0.9 million at <span class=\"_ _2\"></span>year<span class=\"ff3f\">-<span class=\"ls5b\">end.<span class=\"_ _e\"></span></span> </span></span>Trade rece<span class=\"_ _2\"></span>ivables are non-interest<span class=\"_ _e\"></span>-bearing and genera<span class=\"_ _2\"></span>lly have payment terms of 15<span class=\"_ _e\"></span> to 30 days. The increase is driven by both Belgian<span class=\"_ _2\"></span> and German<span class=\"_ _2\"></span> segments against a background of high activity and a significant increase in energy prices.<span class=\"_ _e\"></span> The increase in the le<span class=\"_ _2\"></span>vies is mainly attributable to Germany<span class=\"_ _e\"></span> <span class=\"ff42\">where the offshore receivable position rose from \u20ac20.9 million to<span class=\"_ _2\"></span> \u20ac6<span class=\"_ _e\"></span><span class=\"ff3f\">8.9 </span></span>mi<span class=\"ls1c\">ll<span class=\"ls0\">ion at year end in 2022. </span></span>\u2018Other receivab<span class=\"_ _2\"></span>les\u2019 mainly relate to <span class=\"ff3f\">the margin calls <span class=\"ls57\">(a</span>dvances received or paid as part of co<span class=\"_ _2\"></span>llateralization agreeme<span class=\"_ _e\"></span>nts set up by the </span>group<span class=\"_ _2\"></span> to manage counterparty risk on commodity transact<span class=\"_ _e\"></span>ions) of the German segments <span class=\"ff42\">(\u20ac239 million)</span>. The group<span class=\"_ _2\"></span>'s exposure to credit and currency risks, and impairment losses related to trade receivables are shown in Note<span class=\"_ _e\"></span> 8.1. At 31 December, <span class=\"_ _2\"></span>the ageing analysis of trade receiv<span class=\"_ _e\"></span>ables is as follows: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Not past due 639.6 687.4 Past due 0-30 days 75.6 15.1 Past due 3<span class=\"_ _2\"></span>1-60 days<span class=\"_ _e\"></span> 29.3 2.4 Past due 6<span class=\"_ _2\"></span>1 days <span class=\"_ _e\"></span>- one year 1.8 11.1 Past due o<span class=\"_ _2\"></span>ne year - two years 2.8 2.1 Total (e<span class=\"_ _2\"></span>xcl. impairm<span class=\"_ _e\"></span>ent) 749.1 718.1 Doubtful amounts 202.2 201.4 Amounts write-offs (201.7) (200.8) Allowance for e<span class=\"_ _2\"></span>xpected credit losses<span class=\"_ _e\"></span> (0.9) (2.1) Total 748.7 716.5 See Note 8.1 for<span class=\"_ _2\"></span> a detailed analysis of the credit risk incur<span class=\"_ _e\"></span>red in connection with these trade receiva<span class=\"_ _2\"></span>bles.<span class=\"_ _20\"></span> Considerin<span class=\"_ _2\"></span>g the nature (as regulatory assets) and/or the risk profile of the counterparties (Belgian/German state) of the mos<span class=\"_ _e\"></span>t significant other receiva<span class=\"_ _2\"></span>bles, there is a low impairment risk and thus i<span class=\"_ _e\"></span>t is not needed<span class=\"_ _2\"></span> to record a loss allowance.<span class=\"_ _e\"></span><span class=\"ff40\"> </span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.11. <span class=\"_ _92\"> </span>Cash<span class=\"_ _e\"></span> and cash equivalents (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Short-term deposits 3,516.6 2,486.2 Balance at bank 634.6 563.2 Total 4,151.2 3,049.5 Cash and cash <span class=\"ff42\">equivalents increa<span class=\"_ _2\"></span>sed by \u20ac<span class=\"ff3f\">1,10<span class=\"_ _e\"></span>1.7 million. This increase was mainly due to the higher EEG, KWK a<span class=\"_ _e\"></span>nd Strom<span class=\"_ _2\"></span>NEV </span></span>(levies) <span class=\"ff42\">surplus o<span class=\"_ _2\"></span>f \u20ac2,884.6 million (+\u20ac752,5 million) in Germany and the capital increased completed by the Group.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>Short-term deposits are inve<span class=\"_ _2\"></span>sted for periods varying from a few days or weeks to several months (generally not exceeding three months), depending on<span class=\"_ _2\"></span> immediate cash requirements, an<span class=\"_ _e\"></span>d earn interest in a<span class=\"_ _2\"></span>ccordance with the interest<span class=\"_ _e\"></span> rates for short-term deposits.<span class=\"fc1d\"> </span>Bank account balances earn or pay in<span class=\"_ _2\"></span>terest in line with th<span class=\"_ _e\"></span>e variable rate<span class=\"_ _2\"></span>s of interest on the basis of daily ba<span class=\"_ _e\"></span>nk depo<span class=\"_ _e\"></span>sit interest<span class=\"_ _2\"></span> rates. The group<span class=\"_ _2\"></span>'s interest rate risk and the sensitivity analysis for financial assets and liabilities are discussed in Note 8.2.<span class=\"_ _e\"></span> The ca<span class=\"_ _2\"></span>sh and cash equivalents disclosed above and in the statement of cash flows include <span class=\"_ _e\"></span><span class=\"ff42\">restricted cash for a total of \u20ac2,936.0</span> million held by 50Hertz Transmission<span class=\"_ _2\"></span> GmbH an<span class=\"_ _e\"></span>d <span class=\"ff42 ls5b\">\u20ac1.</span>4 million hel<span class=\"_ _e\"></span>d by Elia Re.<span class=\"fc1d\"> </span>Erreur <span class=\"ls103\">! </span>S<span class=\"_ _2\"></span>ignet non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.RESERVES <span class=\"_ _74\"> </span> In line with Belg<span class=\"_ _2\"></span>ian legislation, 5% of the Company's statu<span class=\"_ _e\"></span>tory net pro<span class=\"_ _2\"></span>fit must be transferred to the legal reserve each year <span class=\"_ _e\"></span>until the legal reserve<span class=\"_ _2\"></span> represents 10% of the capital. As at 31 Decembe<span class=\"_ _e\"></span>r 2022<span class=\"ls1d\">, </span><span class=\"ff42\">the Group's legal reserve amounts to \u20ac180.2</span> milli<span class=\"_ _e\"></span>on and<span class=\"_ _2\"></span> represents 9.8% of the<span class=\"_ _2\"></span> capital.<span class=\"_ _e\"></span> The Board of <span class=\"_ _2\"></span>Directors can propose the pay-<span class=\"_ _e\"></span>out of a dividend to shareholders totalling up to a maximum of the available reserves plus the profit carried f<span class=\"_ _2\"></span>orward from <span class=\"ff42\">the Company\u2019s </span>previ<span class=\"_ _e\"></span>ous financial year<span class=\"_ _2\"></span>s, including the profit <span class=\"_ _e\"></span>for the financial year ending on <span class=\"ls78\">31<span class=\"_ _2\"></span><span class=\"ls0\"> December </span></span>2022<span class=\"ls0\">. Shareholders must approve the dividend payment <span class=\"_ _e\"></span>at the Annual Ge<span class=\"_ _2\"></span>neral Meeting of Shareholders.<span class=\"_ _e\"></span> </span>HEDGING RESERVE <span class=\"_ _139\"> </span> The hedging reserve compr<span class=\"_ _2\"></span>ises the effective portion of the cumulative net change in fair value of cash flow hedgin<span class=\"_ _e\"></span>g instruments with regard to hedged tr<span class=\"_ _2\"></span>ansactions that have not yet occurred.<span class=\"_ _e\"></span> Since 2021, hedge acco<span class=\"_ _2\"></span>unting is applied to future contracts entered into by 50Hertz for the purpose of reducing the risk of fluct<span class=\"_ _e\"></span>uations in the expe<span class=\"_ _2\"></span>cted amount of grid losses. The fair value of these contracts amounted to \u20ac129.6 million at the end of 2022 <span class=\"_ _e\"></span>(\u20ac355.6 million in 2021)<span class=\"_ _2\"></span>. Considering a deferred tax effect, a net variation of the hedge reserve amounting to -<span class=\"_ _e\"></span><span class=\"ff42\">\u20ac159.1 million was recorded in other </span>comprehensive<span class=\"_ _2\"></span> income in 2022. This negative impact was driven by the drop in energy prices in the last quart<span class=\"_ _e\"></span>er of <span class=\"_ _e\"></span>the year and<span class=\"_ _2\"></span> was partly off<span class=\"_ _2\"></span>set by the new derivatives in which Elia Transmissi<span class=\"_ _e\"></span>on Belgium SA/NV ente<span class=\"_ _2\"></span>red into in 2022 for the pre<span class=\"_ _e\"></span>-hedg<span class=\"_ _e\"></span>ing of probable forecasted debt transactions. T<span class=\"_ _2\"></span>he fair value of these derivatives was \u20ac65.3 million at the end of the<span class=\"ff3f\"> yea<span class=\"_ _e\"></span>r 2022, resulting in a net hedging </span>reserve<span class=\"_ _2\"></span> of \u20ac49.0 million fully recognized in other comprehensive income.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>As the costs for gr<span class=\"_ _2\"></span>id losses are almost fully passed through to the tariffs, the fair value of the future contracts has no re<span class=\"_ _e\"></span>levance for the curren<span class=\"_ _2\"></span>t or future profitability of the company.6.12.2. <span class=\"_\"> </span>Hy<span class=\"_ _2\"></span>brid secu<span class=\"_ _e\"></span>rities In September 2018<span class=\"_ _2\"></span>, the group issued hybrid securities to <span class=\"_ _e\"></span>finance the additional 20% stake in 50Hertz Transmission (Germany)<span class=\"_ _2\"></span>. The issue resu<span class=\"_ _2\"></span>lted in a <span class=\"ff42\">\u20ac700 million</span> <span class=\"ff42\">inc<span class=\"_ _e\"></span>rease in the group\u2019s equity.</span> The h<span class=\"_ _2\"></span>ybrid securities bear an optional, cumulative coup<span class=\"_ _e\"></span>on of 2.75%, payable at the g<span class=\"ff42\">roup\u2019s discretion annually on 5 December of each </span>year, with the first payment on 5 December 2019<span class=\"fc1d ls1d\">. </span>As at 31 December 2022, the unpaid cumulative dividend amounted <span class=\"ff42\">to \u20ac1.4 million. </span>(2021<span class=\"_ _2\"></span><span class=\"ls95\">: <span class=\"ff42 ls0\">\u20ac1<span class=\"_ _2\"></span>.4 million). A coupon of \u20ac19.3 million <span class=\"ff3f\">was paid t<span class=\"_ _e\"></span>o the holders of hybrid securities in December 2022. </span></span></span>The h<span class=\"_ _2\"></span>ybrid securities have an initial call date in December 2023, with<span class=\"_ _e\"></span> a reset every five years thereafter.<span class=\"_ _e\"></span> The h<span class=\"_ _2\"></span>ybrid securities are structured as perpetual instrume<span class=\"_ _e\"></span>nts, have junior ranking to all senior debt and are recorde<span class=\"_ _e\"></span>d as equ<span class=\"_ _2\"></span>ity in the group<span class=\"_ _2\"></span><span class=\"ff42\">\u2019s accounts pursuant to IFRS.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.13. <span class=\"_ _92\"> </span>Int<span class=\"_ _e\"></span>erest-bearing loans, borrowings and lease liabilities (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Non-current borrowings 7,638.6 7,658.2 Lease liab<span class=\"_ _2\"></span>ilities \u2212<span class=\"ff3f\"> non-current </span>77.0 83.7 Subtotal non-cu<span class=\"_ _2\"></span>rrent borr<span class=\"_ _e\"></span>owings 7,715.6 7,741.7 Curren<span class=\"_ _2\"></span>t borrowings<span class=\"_ _e\"></span> 772.0 82.3 Lease liab<span class=\"_ _2\"></span>ilities \u2212 current<span class=\"ff3f\"> </span>13.2 35.1 Accrued interest 81.9 76.4 Subtotal current loan<span class=\"_ _2\"></span>s and borr<span class=\"_ _e\"></span>owings 867.2 194.0 Total 8,582.8 7,935.7 The tables be<span class=\"_ _2\"></span>low show the changes in the g<span class=\"_ _e\"></span>roup's liabilities arising from financing activities, in<span class=\"_ _2\"></span>cluding changes arising from <span class=\"_ _e\"></span>both cash flows and non-cash changes. Non-current interest-Current interest-bearing loans (in \u20ac million)<span class=\"ff40\"> </span>bearing loans and<span class=\"_ _2\"></span> Total and borrowings borrowings Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 805.5 7,249.6 8,055.1 Cash flow: r<span class=\"_ _2\"></span>epayment of borrowings<span class=\"_ _e\"></span> (722.3) (15.4) (737.7) Cash flow: procee<span class=\"_ _2\"></span>ds from withdrawal borrowings<span class=\"_ _e\"></span> 60.0 498.0 558.0 Accrued interest 5.4 0.0 5.4 Other 45.4 9.5 54.9 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 193.9 7,741.7 7,935.7 Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 193.9 7,741.7 7,935.7 Cash flow: r<span class=\"_ _2\"></span>epayment of borrowings<span class=\"_ _e\"></span> (82.3) (13.3) (95.8) Cash flow: procee<span class=\"_ _2\"></span>ds from withdrawal borrowings<span class=\"_ _e\"></span> 0.0 747.4 747.4 Accrued interest 5.5 0.2<span class=\"fs8\"> </span>5.7 Other 750.2 (760.4) (10.2) Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 867.2 7,715.6 8,582.8 During the year 2021, th<span class=\"_ _2\"></span>e group (Eu<span class=\"_ _e\"></span>rogrid GmbH) paid back <span class=\"ff42\">the revolving credit facilities (\u20ac700 million) that were temporarily contracted </span>to finance the EEG d<span class=\"_ _2\"></span>eficit at the end of 2020. Elia Group had issu<span class=\"ff42\">ed an Eurobond of \u20ac500.0 million with maturity date 2033 and an </span>interest rate<span class=\"_ _2\"></span> of 0.88%. The group also <span class=\"ff42\">iss<span class=\"_ _e\"></span>ued commercial papers for total amount of \u20ac60.0 m<span class=\"_ _2\"></span>illion with <span class=\"_ _e\"></span><span class=\"ff3f\">maturity date 2022 and an </span></span>interest rate <span class=\"ls5b\">of</span> -<span class=\"ff42\">0.15% under its commercial paper program of \u20ac</span>300.0 million.<span class=\"_ _e\"></span> In 2022, Eurogrid GmbH ha<span class=\"_ _2\"></span>s secured liquidity for the further grid expansion necessary for the energy transition with the issu<span class=\"_ _e\"></span>ance of a \u00e9<span class=\"ff42\">second Green Bond in<span class=\"_ _2\"></span> the amount of \u20ac750.0 million at a rate of 3.279% and a term of nine years. Repayment<span class=\"ff3f\">s<span class=\"_ _e\"></span> of borrowing 2022 </span></span>mainly re<span class=\"_ _2\"></span>late to the closing of the commercial paper program (-<span class=\"ff42\">\u20ac60.0 million) <span class=\"_ _e\"></span></span><span class=\"ls5b\">and </span>the capital repayment of the <span class=\"ff42\">amor<span class=\"_ _e\"></span>tizing loans (\u20ac22.0 </span>million). Movements in 'Other' during the financia<span class=\"_ _2\"></span>l year 2022 <span class=\"_ _e\"></span>mainly relates to reclassifications of long-term debt to short-term debt based on when instrumen<span class=\"_ _2\"></span>ts become due in 2023.<span class=\"_ _e\"></span> Information <span class=\"ls78\">on<span class=\"_ _4b\"></span><span class=\"ls0\"> the<span class=\"_ _e\"></span> terms and conditions of outstanding interest-bearing loans and borrowings is outlined below: </span></span>As per 31 De<span class=\"_ _2\"></span>cember 202<span class=\"ls5b\">2:<span class=\"_ _e\"></span></span> Redemption (in \u20ac million)<span class=\"ff40\"> </span>Matu<span class=\"_ _2\"></span>rity<span class=\"_ _e\"></span> Amount Interest rate schedule Eurobond issues 2013/15 years 2028<span class=\"ls0\"> </span>At maturity 548.0 3.25% Eurobond issues 2013/20 years 2033<span class=\"ls0\"> </span>At maturity 199.3 3.50% Eurobond issues 2014/15 years 2029<span class=\"ls0\"> </span>At maturity 347.6 3.00% Eurobond issues 2015/8.5 years 2024<span class=\"ls0\"> </span>At maturity 499.6 1.38% Eurobond issues 2017/10 years 2027<span class=\"ls0\"> </span>At maturity 248.5 1.38% Senior bo<span class=\"_ _2\"></span>nd 2018/10 years 2028<span class=\"ls0\"> </span>At maturity 298.3 1.50% Eurobond issues 2019/7 year<span class=\"_ _2\"></span>s 2026<span class=\"ls0\"> </span>At maturity 499.0 1.38% Eurobond issues 2020/10 years 2030<span class=\"ls0\"> </span>At maturity 790.9 0.88% Amortising term loan 2033<span class=\"ls0\"> </span>Linear 167.8 1.80% Amortising bond - 7,7 years 2028<span class=\"ls0\"> </span>Linear 50.3 1.56% Amortising bond - 23,7 years 2044<span class=\"ls0\"> </span>Linear 132.4 1.56% European Investment <span class=\"_ _2\"></span>Bank<span class=\"_ _e\"></span> 2025<span class=\"ls0\"> </span>At maturity 100.0 1.08% Commer<span class=\"_ _2\"></span>cial Paper<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>At maturity 0.0 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2025<span class=\"ls0\"> </span>At maturity 499.0 1.875% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2015 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2023<span class=\"ls0\"> </span>At maturity 749.7 1.625% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2015 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2030<span class=\"ls0\"> </span>At maturity 139.4 2.625% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2015 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2028<span class=\"ls0\"> </span>At maturity 748.0 1.500% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2016 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2032<span class=\"ls0\"> </span>At maturity 747.7 1.113% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2020 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2031<span class=\"ls0\"> </span>At maturity 747.4 3,279% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Programme 2021 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2040<span class=\"ls0\"> </span>At maturity 199.5 0,875% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Programme 2020 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2033<span class=\"ls0\"> </span>At maturity 498.3 0,741% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Programme 2021 Registered bond 2014 2044<span class=\"ls0\"> </span>At maturity 50.0 3,000% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Loan with KF<span class=\"_ _2\"></span>W<span class=\"_ _e\"></span> 2026<span class=\"ls0\"> </span>At maturity 150.0 0.90% Total 8,410.7 Lease debts 90.2 Accrued interests 81.9 Total Loan<span class=\"_ _2\"></span>s and Borrowings 8,582.8 (Current and Non-current) As per 31 De<span class=\"_ _2\"></span>cember 2021:<span class=\"_ _e\"></span> Redemption (in \u20ac million)<span class=\"ff40\"> </span>Matu<span class=\"_ _2\"></span>rity<span class=\"_ _e\"></span> Amount Interest rate schedule Eurobond issues 2013/15 years 2028<span class=\"ls0\"> </span>At maturity 547.7 3.25% Eurobond issues 2013/20 years 2033<span class=\"ls0\"> </span>At maturity 199.2 3.50% Eurobond issues 2014/15 years 2029<span class=\"ls0\"> </span>At maturity 347.2 3.00% Eurobond issues 2015/8.5 years 2024<span class=\"ls0\"> </span>At maturity 499.1 1.38% Eurobond issues 2017/10 years 2027<span class=\"ls0\"> </span>At maturity 248.2 1.38% Senior bo<span class=\"_ _2\"></span>nd 2018/10 years 2028<span class=\"ls0\"> </span>At maturity 297.9 1.50% Eurobond issues 2019/7 years 2026<span class=\"ls0\"> </span>At maturity 498.6 1.38% Eurobond issues 2020/10 years 2030<span class=\"ls0\"> </span>At maturity 789.7 0.88% Amortising term loan 2033<span class=\"ls0\"> </span>Linear 181.7 1.80% Amortising bond - 7,7 years 2028<span class=\"ls0\"> </span>Linear 58.7 1.56% Amortising bond - 23,7 years 2044<span class=\"ls0\"> </span>Linear 132.3 1.56% European Investment <span class=\"_ _2\"></span>Bank<span class=\"_ _e\"></span> 2025<span class=\"ls0\"> </span>At maturity 100.0 1.08% Commer<span class=\"_ _2\"></span>cial Paper<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>At maturity 60.0 -0.15% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2015<span class=\"_ _e\"></span> 2025<span class=\"ls0\"> </span>At maturity 498.6 1.88% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2015<span class=\"_ _e\"></span> 2023<span class=\"ls0\"> </span>At maturity 749.4 1.63% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2015<span class=\"_ _e\"></span> 2030<span class=\"ls0\"> </span>At maturity 139.3 2.63% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2016<span class=\"_ _e\"></span> 2028<span class=\"ls0\"> </span>At maturity 747.7 1.50% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2020<span class=\"_ _e\"></span> 2032<span class=\"ls0\"> </span>At maturity 747.4 1.11% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2020<span class=\"_ _e\"></span> 2040<span class=\"ls0\"> </span>At maturity 199.4 0.88% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2021<span class=\"_ _e\"></span> 2033<span class=\"ls0\"> </span>At maturity 498.1 0.88% Registered bond 2014 2044<span class=\"ls0\"> </span>At maturity 50.0 3.00% Loan with KfW 2026<span class=\"ls0\"> </span>At maturity 150.0 0.90% Total 7,740.5 Lease debts 118.8 Accrued interests 76.4 Total Loan<span class=\"_ _2\"></span>s and Borrowings (Current and Non-curr<span class=\"_ _e\"></span>ent) 7,935.7 Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.16. <span class=\"_ _92\"> </span>Oth<span class=\"_ _e\"></span>er non-current liabilities (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Investment grants 213.9 147.2 Non-current deferred<span class=\"_ _2\"></span> income 147.2 140.5 Derivatives 24.7 0.0 Other 1.8 1.8 Total 387.6 289.5 Of the total investment gra<span class=\"_ _2\"></span>nts, \u20ac137.8<span class=\"ff3f\"> million relates to 50<span class=\"_ _e\"></span>Hertz Transmission (Germany) </span>and \u20ac76,2 million to Elia Transmission (Belgium).<span class=\"_ _2\"></span> The investment grants are spread over several assets. The most significant projects a<span class=\"_ _e\"></span>re: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In Belgium<span class=\"_ _2\"></span>: the Princess Elisabeth energy island which will serve as an extension of the electricity grid in the North Sea. This </span></span>grant has been signed in <span class=\"ff42\">December 2022 for a total amount of \u20ac99,7 m<span class=\"_ _2\"></span>illion (pre<span class=\"_ _e\"></span><span class=\"ff3f\">-</span>taxes), out of which \u20ac73,1 million are reported in </span>the Other non-current liability (post taxe<span class=\"_ _2\"></span>s);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In Ge<span class=\"_ _2\"></span>rmany: SuedOstLink and Kriegers Flak Combined Grid Solution<span class=\"_ _2\"></span>.<span class=\"_ _e\"></span> </span></span>All are were<span class=\"_ _2\"></span> subsidized by the European Unio<span class=\"_ _e\"></span>n. The grants are released in profit and loss based on the usefu<span class=\"_ _2\"></span>l lives of the assets to which they relate<span class=\"_ _2\"></span>. The terms and conditions of the grants were monitored and met as per 31 December 2022.<span class=\"_ _e\"></span> Contract liabilities re<span class=\"_ _2\"></span>mained stable<span class=\"fc1d\">.</span> They mainly relate to <span class=\"_ _e\"></span>upfront payment for last mile connection<span class=\"_ _2\"></span>. At the end of 2022, a liability of \u20ac112.7<span class=\"_ _2\"></span> million was recognised within Elia Transmission (Belgium) and a liability of \u20ac34.5 m<span class=\"_ _2\"></span>illion within 50Hertz Transmission<span class=\"_ _e\"></span><span class=\"ff3f\"> (G<span class=\"_ _e\"></span>ermany) </span>with that respect<span class=\"_ _2\"></span>. The income is released over the lifetime of the asset where the last mile connection relates to. As <span class=\"_ _e\"></span>already disclosed in Note 5.1, <span class=\"ff42\">the group has recog<span class=\"_ _2\"></span>nised \u20ac8.3 million of revenue in the reporting period that was included in the contract liability balance <span class=\"_ _e\"></span><span class=\"ff3f\">a<span class=\"ls1d\">t </span></span></span>the beg<span class=\"_ _2\"></span>inning of the period (\u20ac137.3 million), including \u20ac5.1 million from non<span class=\"ff3f\">-cu<span class=\"_ _e\"></span>rrent contract liabilities. </span>The non-curre<span class=\"_ _2\"></span>nt derivatives are related to the long term <span class=\"_ _e\"></span>future contracts entered into by 50Hertz for the purpose of reducing<span class=\"_ _2\"></span> the risk of fluctuation<span class=\"_ _2\"></span>s in the expected amount of grid losses. As p<span class=\"_ _e\"></span>er 31 December 2022, these contracts have a negative fair value du<span class=\"_ _2\"></span>e to the drop in energy pr<span class=\"_ _2\"></span>ices in the last months of the year.<span class=\"_ _e\"></span> Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.17. <span class=\"_ _92\"> </span>Trade<span class=\"_ _e\"></span> and other payables (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Trade deb<span class=\"_ _2\"></span>ts 1,279.0 905.3 VAT and other t<span class=\"_ _2\"></span>axes<span class=\"_ _e\"></span> 29.2 21.1 Remuneration<span class=\"_ _2\"></span> and social security 46.6 40.9 Dividends pa<span class=\"_ _2\"></span>yable<span class=\"_ _e\"></span> 1.2 1.2 Levies 3,125.7 2,177.6 Other 244.7 536.0 Accrued liabilities 77.7 14.2 Total 4,804.2 3,696.4 The trade debts in<span class=\"_ _2\"></span>creased by \u20ac1,107.8 million in a context of increased activity levels and high volatility in energy prices <span class=\"_ _e\"></span><span class=\"ff3f\">in 2022. The </span>significant variation<span class=\"_ _2\"></span> is mostly explained by the levies (+\u20ac948,1 million).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>The <span class=\"ff42\">amoun<span class=\"_ _2\"></span>t for levies can be split into levies related to 50<span class=\"_ _e\"></span>Hertz Transm<span class=\"_ _2\"></span>ission (\u20ac2,<span class=\"_ _e\"></span><span class=\"ff3f ls5b\">959<span class=\"ls0\">.<span class=\"_ _e\"></span>8 million) and levies related to Elia Tran<span class=\"_ _2\"></span>smission </span></span></span>(\u20ac<span class=\"ff3f ls5b\">165<span class=\"ls0\">.9 million). <span class=\"_ _e\"></span> </span></span>The levie<span class=\"_ _2\"></span>s for Elia Transmission <span class=\"ls1c\">in</span>creased compared with<span class=\"_ _e\"></span> the <span class=\"ff42\">previous year (\u20ac</span>+141.3 million). The levies include federal levies, which totalled \u20ac<span class=\"ff3f ls5b\">150<span class=\"ls0\">.0 million on 31 December 2022 </span></span><span class=\"ls57\">(\u20ac</span><span class=\"ff3f\">6.2<span class=\"_ _2\"></span> million<span class=\"_ _e\"></span> in 2021<span class=\"ff42\">). Levies for the Walloon government decrea<span class=\"_ _2\"></span>sed to \u20ac1<span class=\"ff3f\">3.8<span class=\"_ _e\"></span> million, </span></span></span>(\u20ac<span class=\"ff3f ls5b\">17<span class=\"ls0\">.0 million in 2021<span class=\"ff42\">). The remaining balance mainly consists of strategic reserves (\u20ac</span>0<span class=\"_ _e\"></span>.7 million). The significant increase in federal </span></span>leview is explained by a<span class=\"_ _2\"></span> new system implemented in 2022 <span class=\"_ _e\"></span>which allows the group to be pre-funded for its green certificate buybacks in a 2022 context where wind pr<span class=\"_ _2\"></span>oduction has been significantly lower than expected.<span class=\"_ _e\"></span> The levie<span class=\"_ _2\"></span>s for 50Hertz Transmission <span class=\"ls1c\">in</span>creased compared<span class=\"_ _e\"></span> to previous yea<span class=\"ff42\">r (\u20ac2153.0 million) due to the significant in</span>crease of the EEG balance. The<span class=\"_ _2\"></span> 2022 levies mainly include <span class=\"ff42\">EEG (<span class=\"_ _e\"></span>\u20ac2,934.4 million) and \u00a719StromNEV (\u20ac</span>25.3 million). The o<span class=\"_ _2\"></span>ther payables mainly related to margin calls on derivatives hedging grid losses of the German segment (\u20ac235.0 million as<span class=\"_ _e\"></span><span class=\"ff3f\"> of 31 </span>December 2022 compared to \u20ac356<span class=\"_ _2\"></span>.0 million last year) and other regulatory liabilities.6.18. <span class=\"_ _92\"> </span>Fin<span class=\"_ _e\"></span>ancial instruments <span class=\"ff43\">\u2013</span> fair values The fo<span class=\"_ _2\"></span>llowing table shows the carrying amounts and fair values of financial assets and liabilities, including their levels in<span class=\"_ _e\"></span> the fair value hierar<span class=\"_ _2\"></span>chy<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> Carrying amount Fair value (in \u20ac million)<span class=\"ff40\"> </span>Balance at 31 December<span class=\"_ _2\"></span> 2021<span class=\"ls0\"> </span>Other financial assets 7.0  399.4  46.2  452.5  362.6  43.8  406.4  Equity instruments at fair value through other comprehensive income 43.8  43.8  43.8  43.8  Equity instruments at fair value through income 7.0  7.0  7.0  7.0  Derivatives 355.6  355.6  355.6  355.6  Regulatory assets 46.2  46.2  Trade and other receivables  (Current and Non-current) 861.8  861.8  Cash and cash equivalents 3,049.5  3,049.5  Loans and borrowings (Current and Non-Current) 0.0  0.0  0.0  (7,935.7) (7,935.7) (7,968.8) (247.8) (8,216.6) Unsecured bond issues (7,248.5) (7,248.5) (7,476.8) (247.8) (7,724.6) Unsecured financial bank loans and other loans (492.0) (492.0) (492.0) (492.0) Lease liabilities (118.8) (118.8) Accrued interests (76.4) (76.4) Trade and other payables (3,696.4) (3,696.4) Total 7.0 399.4 3,957.5 (11,632.0) (7,268.2) n.r. n.r. n.r. n.r. Balance at 31 December<span class=\"_ _2\"></span> 2022<span class=\"ls0\"> </span>Other financial assets 7.0  296.1  33.8  336.9  226.6  76.4  303.1  Equity instru<span class=\"_ _e\"></span>ments at fa<span class=\"_ _2\"></span>ir value through other comprehensive income 76.4  76.4  76.4  76.4  Equity instruments at fair value through income 7.0  7.0  7.0  7.0  Derivatives 219.7  219.7  219.7  219.7  Regulatory assets 33.8  33.8  Trade and other receivables (Current and Non-current) 1,367.1  1,367.1  Cash and cash equivalents 4,151.2  4,151.2  Loans and borrowings (Current and Non-Current) 0.0  0.0  0.0  (8,582.8) (8,582.8) (8,183.4) (172.9) (8,356.3) Unsecured bond issues (7,243.0) (7,243.0) (7,015.7) (172.9) (7,188.6) Unsecured financial bank loans and other loans (1,167.7) (1,167.7) (1,167.7) (1,167.7) Lease liabilities (90.2) (90.2) Accrued interests (81.9) (81.9) Other non-current liabilities  (24.7) (24.7) out of which, <span class=\"ff48\">Derivatives</span> (24.7) (24.7) (24.7) (24.7) Trade and other payables (4,804.2) (4,804.2) Total 7.0 2<span class=\"ls104\">71<span class=\"_ _e\"></span></span>.4 5,552.1 (13,387.0) (7,556.5) n.r. n.r. n.r. n.r. The above t<span class=\"_ _2\"></span>ables do not include fair value information for financial assets and liabilities not measured at fair value, such as cash and cash equ<span class=\"_ _2\"></span>ivalents, trade and other receivables, and trade and other payables, as their carrying amount is a reasona<span class=\"_ _e\"></span>ble approximation of fair value<span class=\"_ _2\"></span>. We consider that the carrying amount approxi<span class=\"_ _e\"></span>mates the fair value considering the financial and short-te<span class=\"_ _e\"></span>rm nature. FAIR VALUE HI<span class=\"_ _e\"></span>ERARCHY<span class=\"ff3f\"> </span>Fair va<span class=\"_ _2\"></span>lue is the amount for which an asset could be exchanged or a liability settled in an arm's-le<span class=\"_ _e\"></span>ngth transaction. IFRS 7 requires,<span class=\"_ _2\"></span> for financial instrume<span class=\"_ _2\"></span>nts that are measured in the s<span class=\"_ _e\"></span>tatement of financial position at fair value and for financial instruments measured at amortised cost for which<span class=\"_ _2\"></span> the fair value has been disclosed<span class=\"_ _e\"></span>, the disclosure of fair value measurements by level in the following fair value measurement hierarch<span class=\"_ _2\"></span>y: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 1: <span class=\"ff3f\">The fair value of a financial instrument that is traded in an active <span class=\"_ _e\"></span>market is measured based on quoted (unadjusted) </span></span></span>prices for iden<span class=\"_ _2\"></span>tical assets or liabilities. A market is considered active if quoted prices are readily and regularly availabl<span class=\"_ _e\"></span>e from an exchange, dea<span class=\"_ _2\"></span>ler, broker, industry group, pricing service or regulatory agency, and those prices represent actual a<span class=\"_ _e\"></span>nd regularly occurring market transa<span class=\"_ _2\"></span>ctions on an arm\u2019s<span class=\"ff3f\">-length basis.<span class=\"_ _e\"></span> </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 2: <span class=\"ff3f\">The fair value of financial instruments that are not traded in an active market is determined usin<span class=\"_ _e\"></span>g valuation techniques. </span></span></span>These maximise the use of observable market data where these are available and rely as little as possible on entity-specific estimates.<span class=\"_ _2\"></span> If all significant inputs required to assess the fair value of an instrument are observable, either directly (i.e.<span class=\"_ _e\"></span> as prices) or indirectly (<span class=\"_ _2\"></span>i.e. derived from prices), the instrument is included in level 2.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 3: <span class=\"ff3f\">If one or more of the significant inputs used in applying the valuation technique is not based on observable market data, </span></span></span>the finan<span class=\"_ _2\"></span>cial instrument is included in level 3. T<span class=\"ff42\">h<span class=\"_ _e\"></span>e fair value amount included under \u2018Other financial assets\u2019 ha<span class=\"_ _2\"></span>s been determined </span>by referring<span class=\"_ _2\"></span> to either: (i) recent transaction prices, known <span class=\"_ _e\"></span>by the group; for similar financial assets or (ii) valuation reports issued by third partie<span class=\"_ _2\"></span>s. The fa<span class=\"_ _2\"></span>ir value of financial assets and liabilities, other than those presented in the above table, approximates to their carrying amounts largely due to the sh<span class=\"_ _2\"></span>ort-term maturities of these instrume<span class=\"_ _e\"></span>nts. The fa<span class=\"_ _2\"></span>ir value of other financial assets decreased by \u20ac115.6 million compar<span class=\"_ _e\"></span><span class=\"ff3f\">ed to previous year. The decrease mainly results from the </span>fair value<span class=\"_ _2\"></span> of the future contracts entered into by 50Hertz for the purpose of reducing the risk of fluctuations in the expected amount of grid losses <span class=\"ff42\">(\u20ac154,4 m<span class=\"_ _2\"></span>illion end of 2022 compared to \u20ac355.6 m<span class=\"ff3f\">illion last year). This decrease is partly offset by the positive value </span></span>accounted for<span class=\"_ _2\"></span> in Belgium in connection with the pre-<span class=\"_ _e\"></span>hedging of probable forecast debt transa<span class=\"_ _2\"></span>ctions (bonds issuance). The fair value of these derivatives amounted<span class=\"_ _2\"></span> to \u20ac65.3 million. <span class=\"ff3f\">The </span>fair v<span class=\"_ _e\"></span>alue of the Sicav and the group\u2019s stake in EEX increased following rea<span class=\"_ _2\"></span>ssessment of the fair valu<span class=\"_ _2\"></span>e of EEX. Despite a lo<span class=\"_ _2\"></span>wer pricing on the market, the fair value of the bank loans and bond issues increased by \u20ac139.7 million, due to t<span class=\"_ _e\"></span><span class=\"ff3f\">he higher </span>nominal va<span class=\"_ _2\"></span>lue (additional Green Bond in Germany).<span class=\"_ _e\"></span> The fa<span class=\"_ _2\"></span>ir value of sicavs falls into level 1, i.e. valuation is b<span class=\"_ _e\"></span>ased on<span class=\"_ _2\"></span> the listed market price on an active market for identical instruments.<span class=\"_ _20\"></span> The derivative<span class=\"_ _2\"></span> from the price hedge for grid loss procu<span class=\"_ _e\"></span>rement, which is measured at fair value in OCI without affe<span class=\"_ _2\"></span>cting profit or loss, falls under<span class=\"_ _2\"></span> level 1 of the measurement hierarchy. Its value is determined on the basis of the reporting date valuation of the exist<span class=\"_ _e\"></span>ing futures contract<span class=\"_ _2\"></span>s, which are fully contracted via the EEX electricit<span class=\"_ _e\"></span>y exchange and quo<span class=\"_ _2\"></span>ted there. Credit and default risks are avoided with this form o<span class=\"_ _2\"></span>f price hedging via exchange transactions. A<span class=\"_ _e\"></span>t December 31, 2022, the Group reported derivative financia<span class=\"_ _2\"></span>l ins<span class=\"_ _e\"></span>truments in a net amoun<span class=\"_ _2\"></span>t of \u20ac129.6 million. The futures contracts were concluded during the fiscal year at prices between \u20ac61 and \u20ac295 per MWh. As a result of the vo<span class=\"_ _2\"></span>latile price development on the electricity market, a differentiated picture emerged on the balance sheet dat<span class=\"_ _e\"></span>e: Futures for 2023 were still con<span class=\"_ _2\"></span>tracted at advantageous hedging prices and show a positive market value (\u20ac 154.3 million) on the balance s<span class=\"_ _e\"></span><span class=\"ff3f\">heet </span>date, while<span class=\"_ _2\"></span> the futures positions already contracted for 2024 show a negative market value (\u20ac <span class=\"_ _e\"></span><span class=\"ff3f\">-24.7 million) as a result of the price </span>decline shortly be<span class=\"_ _2\"></span>fore the end of 2022. At the balance sheet date, the Group had already hedged a volume of 2.9 TWh for its ex<span class=\"_ _e\"></span>pected physical requirements for grid loss <span class=\"_ _2\"></span>energy in subsequent <span class=\"_ _e\"></span>years. The fa<span class=\"_ _2\"></span>ir value of the bonds is \u20ac7.<span class=\"ff3f ls5b\">036<span class=\"_ _e\"></span><span class=\"ls0\">.5 million (pr</span></span>ior year: <span class=\"_ _e\"></span>\u20ac7.<span class=\"ff3f ls5b\">724<span class=\"ls0\">,6 million). Fair value was determined by reference to published price </span></span>quotations in an active marke<span class=\"_ _2\"></span>t (classified as level 1 in the <span class=\"_ _e\"></span>fair value<span class=\"_ _2\"></span> hierarchy). The fair value of the registered bond is <span class=\"_ _e\"></span><span class=\"ff42\">\u20ac37.2 million</span> <span class=\"ls5b\">as</span> of 31 December 2022 and was determined by reference to third party information, <span class=\"_ _2\"></span>such as pricing services (classified as level 3 in the fair value<span class=\"_ _2\"></span> hierarchy). The fair value of the private placement amounts to <span class=\"ff42\">\u20ac</span>1<span class=\"ls5b\">33<span class=\"_ _e\"></span></span>.2 million (classified as level 3 in the fair value hierarchy).<span class=\"_ _e\"></span> The fa<span class=\"_ _2\"></span>ir value of other bank loans approximates to their carrying amounts largely due to the short-t<span class=\"_ _e\"></span>erm maturities of these instruments. Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.lease liabilities also provided:<span class=\"_ _e\"></span> Use of<span class=\"_ _2\"></span> land and Rent of (in \u20ac million)<span class=\"ff40\"> </span>overhead buildings / lines offices Cars Optical fiber Other Total As of 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 40.0  23.6  14.1  3.7  1.4  82.8  Additions and remeasurements 3.4  16.7  6.1  23.4  0.0  49.6  Depreciation (1.2) (5.3) (5.5) (2.6) (0.2) (14.8) Derecogn<span class=\"_ _2\"></span>ition of right<span class=\"_ _e\"></span>-<span class=\"ls5b\">of</span>-use assets 0.0  (0.0) (0.0) 0.0  0.0  (0.0) As of 31 Dece<span class=\"_ _2\"></span>mber 2021<span class=\"_ _e\"></span> 42.1 35.0 14.7 24.5 1.2 117.5 Use of<span class=\"_ _2\"></span> land and Rent of (in \u20ac million)<span class=\"ff40\"> </span>overhead buildings / lines offices Cars Optical fiber Other Total As of 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 42.1  34.9  14.7  24.5  1.1  117.5  Additions and remeasurements 1.3  (0.1) 4.7  0.2  0.4  6.5  Depreciation (1.3) (6.0) (5.6) (0.5) (0.1) (13.5) Derecogn<span class=\"_ _2\"></span>ition of right<span class=\"_ _e\"></span>-<span class=\"ls5b\">of</span>-use assets 0.0  (0.0) (0.1) (22.0) 0.0  (22.1) As of 31 Dece<span class=\"_ _2\"></span>mber 2022<span class=\"_ _e\"></span> 42.2 28.9 13.7 2.3 1.5 88.5 The r<span class=\"_ _2\"></span>ight-<span class=\"ls78\">of</span>-u<span class=\"_ _2\"></span>se assets are briefly described below:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> use of land and overhead lines constitutes a right for the group to use a well identified piece of land to build <span class=\"ff42\">on someone\u2019s </span></span></span>property. On<span class=\"_ _2\"></span>ly the contracts under which t<span class=\"_ _e\"></span>he group has the full righ<span class=\"_ _2\"></span>t to control the use of the identified asset are in scope.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> <span class=\"ls78\">gr<span class=\"ls5b\">oup</span></span> leases buildings and offices in which<span class=\"_ _2\"></span> corporate functions are performed.<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> group has car leasing contracts which are used by employees for business and private activities.<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> group leases optical fibres to transmit data. Only cables that are clea<span class=\"_ _e\"></span>rly identified are in scope. </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Other<span class=\"_ _2\"></span> lease contracts: printer lease contracts and strategic reserves contracts. Strategic reserves are contracts where the Gro<span class=\"_ _e\"></span>up </span></span>has the right <span class=\"_ _2\"></span>to control the use of a power plant to maintain a balance on the grid.<span class=\"_ _e\"></span> The g<span class=\"_ _2\"></span>roup only <span class=\"_ _2\"></span>has lease <span class=\"_ _2\"></span>contracts with <span class=\"_ _4b\"></span>fixe<span class=\"_ _e\"></span>d lease <span class=\"_ _2\"></span>payments and <span class=\"_ _2\"></span>assesses whether <span class=\"_ _2\"></span>it <span class=\"_ _2\"></span>is reasonable <span class=\"_ _2\"></span>to extend a <span class=\"_ _4b\"></span>le<span class=\"_ _e\"></span>ase contract<span class=\"_ _2\"></span>. If <span class=\"_ _2\"></span>so, the lease contract is va<span class=\"_ _2\"></span>lued as if the extension were exercised. Lease liabilities<span class=\"ff3f fs8\"> </span>Information concerning the ma<span class=\"_ _2\"></span>turity of the contractual undiscounted cash flows is p<span class=\"_ _e\"></span>rovided below: Matu<span class=\"_ _2\"></span>rity analysis - contractual undiscounted cash flow<span class=\"_ _e\"></span>s (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>&lt; 1 year 14.2  32.9  1-5 years 35.1  30.2  &gt; 5 years 54.1  58.0  Total undiscount<span class=\"_ _2\"></span>ed lease liabilities at 31 December<span class=\"_ _e\"></span> 103.4 121.1 Lease liabilities in<span class=\"_ _2\"></span> the statement of financial position at 31 December<span class=\"_ _e\"></span> 90.2 118.8 Curren<span class=\"_ _2\"></span>t 13.2  35.1  Non-current 77.0  83.7  The d<span class=\"_ _2\"></span>iscount rate used to discount the lease liabilities is the g<span class=\"ff42\">roup\u2019s best estimate of the weighted average incremental borrowing rate. </span>The group<span class=\"_ _2\"></span> made use of the practical expedients, i.e. a single discount rate per group of contracts, summarised per their duration.<span class=\"_ _20\"></span> The group<span class=\"_ _2\"></span> has assessed the extension options concluded<span class=\"_ _e\"></span> in the lea<span class=\"_ _2\"></span>se contracts and considers it reasonably likely that these extension options will be<span class=\"_ _2\"></span> executed. The Group has therefore considered the lease contract as if the extension option is exercised in the<span class=\"_ _e\"></span> lease liability.  The group<span class=\"_ _2\"></span> has no lease contracts with variable payments <span class=\"_ _e\"></span>nor r<span class=\"_ _2\"></span>esidual value guarantees. The <span class=\"_ _e\"></span>group did not commit to any lease that has not yet commenced. The group has no contracts <span class=\"_ _2\"></span>which in<span class=\"_ _e\"></span>clude contingent rental payments nor include any escalation clauses or restriction<span class=\"_ _2\"></span>s that are significant <span class=\"_ _e\"></span>regarding the use of the asset in question.  In 2021, an optical fibre lea<span class=\"_ _2\"></span>se contract coming to maturity was prolonged and a purchase option for a value of \u20ac22.0 million<span class=\"_ _e\"></span><span class=\"ff3f\"> was added. </span>The purcha<span class=\"_ _2\"></span>se option came to <span class=\"_ _e\"></span>maturity at the end of February 2022 and the group exercised the option.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__82": {
   "value": "6.9. <span class=\"_ _87\"> </span>Current trade and other receivables, deferred charges and accrue<span class=\"_ _2\"></span>d revenues<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Contract assets 0.9 2.9 Trade rece<span class=\"_ _2\"></span>ivables<span class=\"_ _e\"></span> 748.7 716.5 Advance pa<span class=\"_ _2\"></span>yments<span class=\"_ _e\"></span> 1.9 1.0 Levies 80<span class=\"ls0\">.5 </span>36.6 VAT and other t<span class=\"_ _2\"></span>axes<span class=\"_ _e\"></span> 145.6 79.1 Other 2<span class=\"ls5b\">28</span>.7 25.1 Trade and other receiv<span class=\"_ _2\"></span>ables 1,206.2 861.3 Deferred charges 20.2 18.1 Accrued interests 4.9 Deferred charges and<span class=\"_ _2\"></span> accrued revenues<span class=\"_ _e\"></span> 25.1 18.1 Total 1,231.4 879.4 The total current <span class=\"_ _2\"></span>trade and other receivables, deferred charges and <span class=\"ff42\">acc<span class=\"_ _e\"></span>rued revenues increased by \u20ac352.0 million compared with the </span>previous <span class=\"_ _2\"></span>year. This is mainly explained by the cash collateral reported by the German segment for a total of \u20ac239.0 million a<span class=\"_ _e\"></span><span class=\"ff3f\">nd the </span>higher amount of <span class=\"_ _2\"></span>trade receivables and levies in a context of<span class=\"_ _e\"></span> rising prices. Contract assets are ma<span class=\"_ _2\"></span>inly related to<span class=\"_ _e\"></span> EGI's business and transmission system operations. The position decreased from <span class=\"ff42\">\u20ac2.9 million</span> in the previous year <span class=\"ff42\">to \u20ac0.9 million at <span class=\"_ _2\"></span>year<span class=\"ff3f\">-<span class=\"ls5b\">end.<span class=\"_ _e\"></span></span> </span></span>Trade rece<span class=\"_ _2\"></span>ivables are non-interest<span class=\"_ _e\"></span>-bearing and genera<span class=\"_ _2\"></span>lly have payment terms of 15<span class=\"_ _e\"></span> to 30 days. The increase is driven by both Belgian<span class=\"_ _2\"></span> and German<span class=\"_ _2\"></span> segments against a background of high activity and a significant increase in energy prices.<span class=\"_ _e\"></span> The increase in the le<span class=\"_ _2\"></span>vies is mainly attributable to Germany<span class=\"_ _e\"></span> <span class=\"ff42\">where the offshore receivable position rose from \u20ac20.9 million to<span class=\"_ _2\"></span> \u20ac6<span class=\"_ _e\"></span><span class=\"ff3f\">8.9 </span></span>mi<span class=\"ls1c\">ll<span class=\"ls0\">ion at year end in 2022. </span></span>\u2018Other receivab<span class=\"_ _2\"></span>les\u2019 mainly relate to <span class=\"ff3f\">the margin calls <span class=\"ls57\">(a</span>dvances received or paid as part of co<span class=\"_ _2\"></span>llateralization agreeme<span class=\"_ _e\"></span>nts set up by the </span>group<span class=\"_ _2\"></span> to manage counterparty risk on commodity transact<span class=\"_ _e\"></span>ions) of the German segments <span class=\"ff42\">(\u20ac239 million)</span>. The group<span class=\"_ _2\"></span>'s exposure to credit and currency risks, and impairment losses related to trade receivables are shown in Note<span class=\"_ _e\"></span> 8.1. At 31 December, <span class=\"_ _2\"></span>the ageing analysis of trade receiv<span class=\"_ _e\"></span>ables is as follows: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Not past due 639.6 687.4 Past due 0-30 days 75.6 15.1 Past due 3<span class=\"_ _2\"></span>1-60 days<span class=\"_ _e\"></span> 29.3 2.4 Past due 6<span class=\"_ _2\"></span>1 days <span class=\"_ _e\"></span>- one year 1.8 11.1 Past due o<span class=\"_ _2\"></span>ne year - two years 2.8 2.1 Total (e<span class=\"_ _2\"></span>xcl. impairm<span class=\"_ _e\"></span>ent) 749.1 718.1 Doubtful amounts 202.2 201.4 Amounts write-offs (201.7) (200.8) Allowance for e<span class=\"_ _2\"></span>xpected credit losses<span class=\"_ _e\"></span> (0.9) (2.1) Total 748.7 716.5 See Note 8.1 for<span class=\"_ _2\"></span> a detailed analysis of the credit risk incur<span class=\"_ _e\"></span>red in connection with these trade receiva<span class=\"_ _2\"></span>bles.<span class=\"_ _20\"></span> Considerin<span class=\"_ _2\"></span>g the nature (as regulatory assets) and/or the risk profile of the counterparties (Belgian/German state) of the mos<span class=\"_ _e\"></span>t significant other receiva<span class=\"_ _2\"></span>bles, there is a low impairment risk and thus i<span class=\"_ _e\"></span>t is not needed<span class=\"_ _2\"></span> to record a loss allowance.<span class=\"_ _e\"></span><span class=\"ff40\"> </span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTaxReceivablesAndPayablesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__80": {
   "value": "6.9. <span class=\"_ _87\"> </span>Current trade and other receivables, deferred charges and accrue<span class=\"_ _2\"></span>d revenues<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Contract assets 0.9 2.9 Trade rece<span class=\"_ _2\"></span>ivables<span class=\"_ _e\"></span> 748.7 716.5 Advance pa<span class=\"_ _2\"></span>yments<span class=\"_ _e\"></span> 1.9 1.0 Levies 80<span class=\"ls0\">.5 </span>36.6 VAT and other t<span class=\"_ _2\"></span>axes<span class=\"_ _e\"></span> 145.6 79.1 Other 2<span class=\"ls5b\">28</span>.7 25.1 Trade and other receiv<span class=\"_ _2\"></span>ables 1,206.2 861.3 Deferred charges 20.2 18.1 Accrued interests 4.9 Deferred charges and<span class=\"_ _2\"></span> accrued revenues<span class=\"_ _e\"></span> 25.1 18.1 Total 1,231.4 879.4 The total current <span class=\"_ _2\"></span>trade and other receivables, deferred charges and <span class=\"ff42\">acc<span class=\"_ _e\"></span>rued revenues increased by \u20ac352.0 million compared with the </span>previous <span class=\"_ _2\"></span>year. This is mainly explained by the cash collateral reported by the German segment for a total of \u20ac239.0 million a<span class=\"_ _e\"></span><span class=\"ff3f\">nd the </span>higher amount of <span class=\"_ _2\"></span>trade receivables and levies in a context of<span class=\"_ _e\"></span> rising prices. Contract assets are ma<span class=\"_ _2\"></span>inly related to<span class=\"_ _e\"></span> EGI's business and transmission system operations. The position decreased from <span class=\"ff42\">\u20ac2.9 million</span> in the previous year <span class=\"ff42\">to \u20ac0.9 million at <span class=\"_ _2\"></span>year<span class=\"ff3f\">-<span class=\"ls5b\">end.<span class=\"_ _e\"></span></span> </span></span>Trade rece<span class=\"_ _2\"></span>ivables are non-interest<span class=\"_ _e\"></span>-bearing and genera<span class=\"_ _2\"></span>lly have payment terms of 15<span class=\"_ _e\"></span> to 30 days. The increase is driven by both Belgian<span class=\"_ _2\"></span> and German<span class=\"_ _2\"></span> segments against a background of high activity and a significant increase in energy prices.<span class=\"_ _e\"></span> The increase in the le<span class=\"_ _2\"></span>vies is mainly attributable to Germany<span class=\"_ _e\"></span> <span class=\"ff42\">where the offshore receivable position rose from \u20ac20.9 million to<span class=\"_ _2\"></span> \u20ac6<span class=\"_ _e\"></span><span class=\"ff3f\">8.9 </span></span>mi<span class=\"ls1c\">ll<span class=\"ls0\">ion at year end in 2022. </span></span>\u2018Other receivab<span class=\"_ _2\"></span>les\u2019 mainly relate to <span class=\"ff3f\">the margin calls <span class=\"ls57\">(a</span>dvances received or paid as part of co<span class=\"_ _2\"></span>llateralization agreeme<span class=\"_ _e\"></span>nts set up by the </span>group<span class=\"_ _2\"></span> to manage counterparty risk on commodity transact<span class=\"_ _e\"></span>ions) of the German segments <span class=\"ff42\">(\u20ac239 million)</span>. The group<span class=\"_ _2\"></span>'s exposure to credit and currency risks, and impairment losses related to trade receivables are shown in Note<span class=\"_ _e\"></span> 8.1. At 31 December, <span class=\"_ _2\"></span>the ageing analysis of trade receiv<span class=\"_ _e\"></span>ables is as follows: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Not past due 639.6 687.4 Past due 0-30 days 75.6 15.1 Past due 3<span class=\"_ _2\"></span>1-60 days<span class=\"_ _e\"></span> 29.3 2.4 Past due 6<span class=\"_ _2\"></span>1 days <span class=\"_ _e\"></span>- one year 1.8 11.1 Past due o<span class=\"_ _2\"></span>ne year - two years 2.8 2.1 Total (e<span class=\"_ _2\"></span>xcl. impairm<span class=\"_ _e\"></span>ent) 749.1 718.1 Doubtful amounts 202.2 201.4 Amounts write-offs (201.7) (200.8) Allowance for e<span class=\"_ _2\"></span>xpected credit losses<span class=\"_ _e\"></span> (0.9) (2.1) Total 748.7 716.5 See Note 8.1 for<span class=\"_ _2\"></span> a detailed analysis of the credit risk incur<span class=\"_ _e\"></span>red in connection with these trade receiva<span class=\"_ _2\"></span>bles.<span class=\"_ _20\"></span> Considerin<span class=\"_ _2\"></span>g the nature (as regulatory assets) and/or the risk profile of the counterparties (Belgian/German state) of the mos<span class=\"_ _e\"></span>t significant other receiva<span class=\"_ _2\"></span>bles, there is a low impairment risk and thus i<span class=\"_ _e\"></span>t is not needed<span class=\"_ _2\"></span> to record a loss allowance.<span class=\"_ _e\"></span><span class=\"ff40\"> </span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTradeAndOtherReceivablesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__81-1": {
   "value": "At 31 December, <span class=\"_ _2\"></span>the ageing analysis of trade receiv<span class=\"_ _e\"></span>ables is as follows: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Not past due 639.6 687.4 Past due 0-30 days 75.6 15.1 Past due 3<span class=\"_ _2\"></span>1-60 days<span class=\"_ _e\"></span> 29.3 2.4 Past due 6<span class=\"_ _2\"></span>1 days <span class=\"_ _e\"></span>- one year 1.8 11.1 Past due o<span class=\"_ _2\"></span>ne year - two years 2.8 2.1 Total (e<span class=\"_ _2\"></span>xcl. impairm<span class=\"_ _e\"></span>ent) 749.1 718.1 Doubtful amounts 202.2 201.4 Amounts write-offs (201.7) (200.8) Allowance for e<span class=\"_ _2\"></span>xpected credit losses<span class=\"_ _e\"></span> (0.9) (2.1) Total 748.7 716.5 See Note 8.1 for<span class=\"_ _2\"></span> a detailed analysis of the credit risk incur<span class=\"_ _e\"></span>red in connection with these trade receiva<span class=\"_ _2\"></span>bles.<span class=\"_ _20\"></span> Considerin<span class=\"_ _2\"></span>g the nature (as regulatory assets) and/or the risk profile of the counterparties (Belgian/German state) of the mos<span class=\"_ _e\"></span>t significant other receiva<span class=\"_ _2\"></span>bles, there is a low impairment risk and thus i<span class=\"_ _e\"></span>t is not needed<span class=\"_ _2\"></span> to record a loss allowance.<span class=\"_ _e\"></span><span class=\"ff40\"> </span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.c<span class=\"_ _e\"></span>redit risk, etc. can be settled in the tariffs, in a<span class=\"_ _2\"></span>ccordance with the applicable legi<span class=\"_ _e\"></span>slation. MARKET RISK The market risk take<span class=\"_ _2\"></span>s into account negative effects on the financial positi<span class=\"_ _e\"></span>on and cash flows of the group arising as a result of price changes on the market which cannot be otherwise avoided. The activities o<span class=\"_ _2\"></span>f the grou<span class=\"_ _e\"></span>p extend to the ele<span class=\"_ _2\"></span>ctricity mark<span class=\"_ _e\"></span>et <span class=\"ff42\">\u2013</span> in particular through selling<span class=\"_ _2\"></span> the electricity generated from renewa<span class=\"_ _e\"></span>ble energy as well as the procurement of energy to cover grid energ<span class=\"_ _2\"></span>y losses <span class=\"ff42\">\u2013</span> <span class=\"_ _e\"></span>as well as to th<span class=\"_ _2\"></span>e market for short-term deposits. In Germany, t<span class=\"ls5b\">he </span>gr<span class=\"_ _e\"></span>oup counteracts the procurement price risk for grid loss energy by hedging<span class=\"_ _2\"></span> prices at an early stage using futures contracts on the EEX electricity exchange<span class=\"_ _20\"></span> Foreign curren<span class=\"_ _e\"></span>cy risk<span class=\"_ _2\"></span> <span class=\"_ _251\"> </span> The group<span class=\"_ _2\"></span> is not exposed to any significant currency risk, <span class=\"_ _e\"></span>either from transa<span class=\"_ _2\"></span>ctions or from exchanging foreign currencies into euro, si<span class=\"_ _e\"></span>nce it has no material foreign investments or activities and less than 1<span class=\"_ _2\"></span>% of its costs are expressed in currencies other than euro<span class=\"_ _e\"></span>s. Inter<span class=\"_ _e\"></span>est rate risk<span class=\"_ _2\"></span> Intere<span class=\"_ _2\"></span>st rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of c<span class=\"_ _e\"></span>hanges in market interest rate<span class=\"_ _2\"></span>s. The Group's exposure to the risk of changes in market interest rates relates prima<span class=\"_ _e\"></span>rily to its long-term debt obligations with floating interest<span class=\"_ _2\"></span> rates. As at 31 December 2022, 5 interest<span class=\"_ _e\"></span>-rate swaps were outstanding in connection with pre-hedgi<span class=\"_ _e\"></span>ng of probable forecasted debt transactions. T<span class=\"_ _2\"></span>he interest rate swaps on the other loan and the loan with Publi-Part to cover a nominal debt amount of \u20ac300 m<span class=\"_ _2\"></span>illion were settled in June 2020, together with the repayment of the loans. <span class=\"_ _e\"></span><span class=\"ff3f\"> </span>See Note 6.13 for a summa<span class=\"_ _2\"></span>ry of the outstanding loans an<span class=\"_ _e\"></span>d their respective interest rates. CREDIT RISK Credit risk encompasses a<span class=\"_ _2\"></span>ll forms of counterparty exposure, i.e. where counterparties may default on their obligations to the group in relation to lend<span class=\"_ _2\"></span>ing, hedging, settlement and other financial activities. The group is exposed to credit risk from its op<span class=\"_ _e\"></span>erating activities and treasur<span class=\"_ _2\"></span>y activities. With regards <span class=\"ls1d\">to<span class=\"_ _e\"></span></span> its operating activities, the group <span class=\"ff42\">has a credit policy in place, which takes into account cu<span class=\"_ _2\"></span>stomer\u2019s risk </span>profiles. The e<span class=\"_ _2\"></span>xposure to credit risk is monitored on an ongoing basis, resulting in a request to issue bank guaranties from t<span class=\"_ _e\"></span>he counterparty<span class=\"_ _2\"></span> for some major contracts.<span class=\"_ _e\"></span> At the end<span class=\"_ _2\"></span> of the reporting period there were no significant concentrations of credit risks. The maximum credit risk is the carrying amoun<span class=\"_ _2\"></span>t for each financial asset, including derivative financial instruments.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Note 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Immedia<span class=\"_ _2\"></span>tely claimable deposits<span class=\"_ _e\"></span> 7.0  7.0  Reimbursemen<span class=\"_ _2\"></span>t rights<span class=\"_ _e\"></span> 34.6  46.2  Other shareholding<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> 75.6  43.8  Derivatives (<span class=\"_ _2\"></span>Current and Non-current)<span class=\"_ _e\"></span> 219.7  355.6  Other financial <span class=\"_ _2\"></span>assets (Current and Non-c<span class=\"_ _e\"></span>urrent) (6.6) 336.9  452.5  Non-current t<span class=\"_ _2\"></span>rade and other r<span class=\"_ _e\"></span>eceivables 95.5  0.5  Trade and other receiv<span class=\"_ _2\"></span>ables (6.9) 1,206.2  861.3  Current tax<span class=\"_ _2\"></span> assets<span class=\"_ _e\"></span> (6.10) 28.6  10.1  Cash and cash<span class=\"_ _2\"></span> equivalents<span class=\"_ _e\"></span> (6.11) 4,151.2  3,049.5  Deferred charges (6.9) 25.1  18.1  Total 5,843.5  4,392.0  The movement in the allowance for expe<span class=\"_ _2\"></span>cted credit losses<span class=\"_ _e\"></span> in relation to trade receivables during the year was as outlined in the table below: <span class=\"_ _15e\"> </span> (in \u20ac million)<span class=\"ff40\"> </span>Bad debtors Impairment losses Remaining ba<span class=\"_ _2\"></span>lance<span class=\"_ _e\"></span> Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 201.5  (201.0) 0.4  Changes during the year (0.1) 0.2  0.1  Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 201.4  (200.8) 0.5  Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 201.4  (200.8) 0.5  Changes during the year 0.8  (0.8) 0.0  Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 202.2  (201.7) 0.5  Almost all bad<span class=\"_ _2\"></span> debtors are related to outstanding receivables <span class=\"_ _e\"></span>linked to the regulatory levies in Germany. If a debtor <span class=\"_ _e\"></span>goes bankrupt, 50Hertz Tran<span class=\"_ _2\"></span>smission is compensated by the reg<span class=\"_ _e\"></span>ulator for the loss incurred. The group<span class=\"_ _2\"></span> believes that the unimpaired amounts overdue by more than 30 <span class=\"_ _e\"></span>days are still collectible, based on historical payment behaviour and extensive an<span class=\"_ _2\"></span>alysis of customer credit risk, including customers' underlying credit ratings, when available. The<span class=\"_ _e\"></span> credit quality of trade<span class=\"_ _2\"></span> and other receivables is assessed based on a credit policy.<span class=\"_ _e\"></span> IFRS 9 requires <span class=\"_ _2\"></span>the group to impair financial assets based on a forward-looki<span class=\"_ _e\"></span>ng expected credit loss (ECL) approach. <span class=\"ff45\"> </span>As of 2022<span class=\"_ _2\"></span>, the group applies an individualized approach for trade receivables, for w<span class=\"_ _e\"></span>hich the Group has set ru<span class=\"_ _2\"></span>les fo<span class=\"_ _e\"></span>r defining the s<span class=\"_ _2\"></span>tage of the concer<span class=\"_ _2\"></span>ned asset for Expected Credit Loss (ECL) ca<span class=\"_ _e\"></span>lculations. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">sta<span class=\"_ _2\"></span>ge 1<span class=\"ff3f\"> covers financial assets that have not deteriorated significantly since initial recognition. The ECL for<span class=\"_ _2\"></span> stage<span class=\"_ _e\"></span> 1 <span class=\"_ _e\"></span>is calculated </span></span></span>on a 12-month basis, \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">sta<span class=\"_ _2\"></span>ge 2<span class=\"ff3f\"> covers financial assets for which the credit risk has significantly increased. The ECL for stage 2 is calculated on a lifetim<span class=\"_ _e\"></span><span class=\"ls5b\">e </span></span></span></span>basis. The decisio<span class=\"_ _2\"></span>n to move an asset from stage 1 to stage 2 is based on certain cr<span class=\"_ _e\"></span>iteria such as:  o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">a significant downgrade in the creditworthiness of a counterparty and/or its parent company and/or its guara<span class=\"_ _2\"></span>ntor (if <span class=\"_ _e\"></span>any), <span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">significant adverse changes in the regulatory environment, </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">changes in political or country-related risks, and  </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">any other aspect the Group may consider relevant.  </span></span>Regarding fina<span class=\"_ _2\"></span>ncial assets that are more than 30 days past due, the move to stage 2 is not systematically applied as long as t<span class=\"_ _e\"></span>he Group has rea<span class=\"_ _2\"></span>sonable and supporting infor<span class=\"_ _e\"></span>mation that demonstrates that, even if payments become more than 30 days past due, this does not repre<span class=\"_ _2\"></span>sent a significant increase in the credit risk since initial recognition.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">sta<span class=\"_ _2\"></span>ge 3<span class=\"ff3f\"> covers assets for which default has already been observed, such as:<span class=\"_ _e\"></span> </span></span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">when there is <span class=\"_ _2\"></span>evidence of failure in cre<span class=\"_ _2\"></span>dit support fr<span class=\"_ _2\"></span>om a parent company to<span class=\"_ _2\"></span> its subsidiary (in t<span class=\"_ _2\"></span>his case th<span class=\"_ _2\"></span>e subsidiary is the </span></span>Group\u2019s counterparty at r<span class=\"_ _2\"></span>isk),<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">when a Group entity has initiated legal proceedings against the counterparty for non-payment.<span class=\"_ _e\"></span> </span></span>Regarding fina<span class=\"_ _2\"></span>ncial assets that are more than 90 days pa<span class=\"_ _e\"></span>st due, the presumption can be<span class=\"_ _2\"></span> rebutted if the Group has reasonable and suppor<span class=\"_ _2\"></span>table information that demonstrates that even if pa<span class=\"_ _e\"></span>yments become<span class=\"_ _2\"></span> more than 90 days past due, this does not<span class=\"_ _e\"></span> indicate counterparty<span class=\"_ _2\"></span> default.<span class=\"_ _e\"></span> The ECL formula<span class=\"_ _2\"></span> applicable in stages 1 and 2 is ECL = E<span class=\"_ _e\"></span>AD x PD x LGD, where: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">for 1<span class=\"_ _2\"></span>2-month ECL, Exposure At Default (EAD) equals the carrying<span class=\"_ _2\"></span> amount of the financial asset, to which the relevant Probability </span></span>of Default (PD) an<span class=\"_ _2\"></span>d the Loss Given Default (LGD) are applied<span class=\"_ _e\"></span><span class=\"ls1d\">; <span class=\"_ _e\"></span></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">for life<span class=\"_ _2\"></span>time ECL, the calculation method consists in identifying changes in exposure for each year, especially the expected ti<span class=\"_ _e\"></span>ming </span></span>and amount of th<span class=\"_ _2\"></span>e contractual repayments, and then applying to each repayment the relevant PD and the LGD, and discounting<span class=\"_ _e\"></span> the figures ob<span class=\"_ _2\"></span>tained. ECL is then the sum of the discounted figures; and <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">pro<span class=\"_ _2\"></span>bability of default is the likelihood of default over a particular time horizon (in stage 1, this time horizon is 12 month<span class=\"_ _e\"></span>s after the </span></span>repor<span class=\"_ _2\"></span>ting period; in stage 2 this time horizon is the e<span class=\"_ _e\"></span>ntire lifetime of the financial asset). This informa<span class=\"_ _2\"></span>tion is based on external data from a<span class=\"_ _2\"></span> well-known rating agency. The PD depends on the time horizon and of the rating of the counterparty. <span class=\"_ _e\"></span> The Group uses externa<span class=\"_ _2\"></span>l ratings if they are available; <span class=\"_ _e\"></span>or an internal ra<span class=\"_ _2\"></span>ting for major counterparties with no external <span class=\"_ _e\"></span>rating.  Elia Group d<span class=\"_ _2\"></span>id not see any changes in payment behaviour, nor an increase in bad debtors as a consequence of the crisis in 202<span class=\"_ _e\"></span><span class=\"ls5b\">1 </span>(C<span class=\"ls0\">OVID-<span class=\"ls5b\">19</span>) nor in 2022 (energy crisis) and it does not ex<span class=\"_ _e\"></span>pect any major impact related to the pandemic to arise in the coming years.<span class=\"_ _e\"></span> </span>Subsequently, a loss <span class=\"_ _2\"></span>given default is calculated as the percentage of the amount of trade receivables that is not covered b<span class=\"_ _2\"></span>y <span class=\"_ _e\"></span>a ba<span class=\"_ _e\"></span>nk guarantee.<span class=\"_ _2\"></span> <span class=\"ff42\">The total outstanding amount of trade receivables covered by a bank guarantee totals \u20ac97.1 million. The loss given default<span class=\"_ _e\"></span></span> is multiplied b<span class=\"_ _2\"></span>y the outstanding trade receivables.<span class=\"_ _e\"></span> This approa<span class=\"_ _2\"></span>ch is deemed more relevant than the portfolio approach to provid<span class=\"_ _e\"></span>e a better assessment of the risk, especially in the current context o<span class=\"_ _2\"></span>f volatile market conditions. The impact of this new approach is not significant. Furthermore, any <span class=\"_ _e\"></span>losses would be recoverable through the<span class=\"_ _2\"></span> tariffs. <span class=\"_ _e\"></span> The model is applied to the<span class=\"_ _2\"></span> trade receivables, all other fin<span class=\"_ _e\"></span>ancial assets<span class=\"_ _2\"></span> being not assessed at risk of impairment co<span class=\"_ _e\"></span>nsidering<span class=\"_ _2\"></span> their nature (regu<span class=\"_ _2\"></span>latory assets, amounts recoverable through future tariffs in compliance with the regulatory frameworks), risk profile (reliable counterparty<span class=\"_ _2\"></span> being for the levies the Belgian/German stat<span class=\"_ _e\"></span>e) or measurement metho<span class=\"_ _2\"></span>d (at fair value). More details are provided in the different note<span class=\"_ _2\"></span>s.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAllowanceForCreditLossesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__88": {
   "value": "6.11. <span class=\"_ _92\"> </span>Cash<span class=\"_ _e\"></span> and cash equivalents (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Short-term deposits 3,516.6 2,486.2 Balance at bank 634.6 563.2 Total 4,151.2 3,049.5 Cash and cash <span class=\"ff42\">equivalents increa<span class=\"_ _2\"></span>sed by \u20ac<span class=\"ff3f\">1,10<span class=\"_ _e\"></span>1.7 million. This increase was mainly due to the higher EEG, KWK a<span class=\"_ _e\"></span>nd Strom<span class=\"_ _2\"></span>NEV </span></span>(levies) <span class=\"ff42\">surplus o<span class=\"_ _2\"></span>f \u20ac2,884.6 million (+\u20ac752,5 million) in Germany and the capital increased completed by the Group.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>Short-term deposits are inve<span class=\"_ _2\"></span>sted for periods varying from a few days or weeks to several months (generally not exceeding three months), depending on<span class=\"_ _2\"></span> immediate cash requirements, an<span class=\"_ _e\"></span>d earn interest in a<span class=\"_ _2\"></span>ccordance with the interest<span class=\"_ _e\"></span> rates for short-term deposits.<span class=\"fc1d\"> </span>Bank account balances earn or pay in<span class=\"_ _2\"></span>terest in line with th<span class=\"_ _e\"></span>e variable rate<span class=\"_ _2\"></span>s of interest on the basis of daily ba<span class=\"_ _e\"></span>nk depo<span class=\"_ _e\"></span>sit interest<span class=\"_ _2\"></span> rates. The group<span class=\"_ _2\"></span>'s interest rate risk and the sensitivity analysis for financial assets and liabilities are discussed in Note 8.2.<span class=\"_ _e\"></span> The ca<span class=\"_ _2\"></span>sh and cash equivalents disclosed above and in the statement of cash flows include <span class=\"_ _e\"></span><span class=\"ff42\">restricted cash for a total of \u20ac2,936.0</span> million held by 50Hertz Transmission<span class=\"_ _2\"></span> GmbH an<span class=\"_ _e\"></span>d <span class=\"ff42 ls5b\">\u20ac1.</span>4 million hel<span class=\"_ _e\"></span>d by Elia Re.<span class=\"fc1d\"> </span>Erreur <span class=\"ls103\">! </span>S<span class=\"_ _2\"></span>ignet non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDepositsFromBanksExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__85": {
   "value": "6.11. <span class=\"_ _92\"> </span>Cash<span class=\"_ _e\"></span> and cash equivalents (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Short-term deposits 3,516.6 2,486.2 Balance at bank 634.6 563.2 Total 4,151.2 3,049.5 Cash and cash <span class=\"ff42\">equivalents increa<span class=\"_ _2\"></span>sed by \u20ac<span class=\"ff3f\">1,10<span class=\"_ _e\"></span>1.7 million. This increase was mainly due to the higher EEG, KWK a<span class=\"_ _e\"></span>nd Strom<span class=\"_ _2\"></span>NEV </span></span>(levies) <span class=\"ff42\">surplus o<span class=\"_ _2\"></span>f \u20ac2,884.6 million (+\u20ac752,5 million) in Germany and the capital increased completed by the Group.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>Short-term deposits are inve<span class=\"_ _2\"></span>sted for periods varying from a few days or weeks to several months (generally not exceeding three months), depending on<span class=\"_ _2\"></span> immediate cash requirements, an<span class=\"_ _e\"></span>d earn interest in a<span class=\"_ _2\"></span>ccordance with the interest<span class=\"_ _e\"></span> rates for short-term deposits.<span class=\"fc1d\"> </span>Bank account balances earn or pay in<span class=\"_ _2\"></span>terest in line with th<span class=\"_ _e\"></span>e variable rate<span class=\"_ _2\"></span>s of interest on the basis of daily ba<span class=\"_ _e\"></span>nk depo<span class=\"_ _e\"></span>sit interest<span class=\"_ _2\"></span> rates. The group<span class=\"_ _2\"></span>'s interest rate risk and the sensitivity analysis for financial assets and liabilities are discussed in Note 8.2.<span class=\"_ _e\"></span> The ca<span class=\"_ _2\"></span>sh and cash equivalents disclosed above and in the statement of cash flows include <span class=\"_ _e\"></span><span class=\"ff42\">restricted cash for a total of \u20ac2,936.0</span> million held by 50Hertz Transmission<span class=\"_ _2\"></span> GmbH an<span class=\"_ _e\"></span>d <span class=\"ff42 ls5b\">\u20ac1.</span>4 million hel<span class=\"_ _e\"></span>d by Elia Re.<span class=\"fc1d\"> </span>Erreur <span class=\"ls103\">! </span>S<span class=\"_ _2\"></span>ignet non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCashAndCashEquivalentsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__87": {
   "value": "The ca<span class=\"_ _2\"></span>sh and cash equivalents disclosed above and in the statement of cash flows include <span class=\"_ _e\"></span><span class=\"ff42\">restricted cash for a total of \u20ac2,936.0</span> million held by 50Hertz Transmission<span class=\"_ _2\"></span> GmbH an<span class=\"_ _e\"></span>d <span class=\"ff42 ls5b\">\u20ac1.</span>4 million hel<span class=\"_ _e\"></span>d by Elia Re.<span class=\"fc1d\"> </span>Erreur <span class=\"ls103\">! </span>S<span class=\"_ _2\"></span>ignet non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRestrictedCashAndCashEquivalentsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__89": {
   "value": "6.12.1. <span class=\"_\"> </span>Equity attributable to the owners <span class=\"_ _2\"></span>of the Com<span class=\"_ _2\"></span>pany<span class=\"_ _e\"></span> SHARE C<span class=\"_ _e\"></span>APITAL AND S<span class=\"_ _2\"></span>HARE PREMIUM Number of shares 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Number<span class=\"_ _2\"></span> of issued shares at the beginning of the year<span class=\"_ _e\"></span> 68,728<span class=\"_ _2\"></span>,055<span class=\"_ _e\"></span> 68,720<span class=\"_ _2\"></span>,695<span class=\"_ _e\"></span> Issued against ca<span class=\"_ _2\"></span>sh payment<span class=\"_ _e\"></span> 4,787,784 7,360 Number of i<span class=\"_ _2\"></span>ssued shares at the end of the year<span class=\"_ _e\"></span> 73,515<span class=\"_ _2\"></span>,839<span class=\"_ _e\"></span> 68,728<span class=\"_ _2\"></span>,055<span class=\"_ _e\"></span> Number<span class=\"_ _2\"></span> of treasury shares at the end of the year<span class=\"_ _e\"></span> 13,480 7,248 Number of outstanding<span class=\"_ _2\"></span> shares at the end of the year 73,502<span class=\"_ _2\"></span>,359<span class=\"_ _e\"></span> 68,720<span class=\"_ _2\"></span>,807<span class=\"_ _e\"></span> The capital ha<span class=\"_ _2\"></span>s been modified twice d<span class=\"_ _e\"></span>uring the year 2022<span class=\"ls1d\">: </span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">On 24<span class=\"_ _2\"></span> June 2022, Elia Group SA/NV successfully completed a public offering of new shares <span class=\"_ _2\"></span>to existing shareholder<span class=\"_ _e\"></span>s and an<span class=\"_ _2\"></span>y </span></span>holders of an<span class=\"_ _2\"></span> extra-legal preferential right. Through this offering, the capital of Elia Group SA/NV has increase<span class=\"_ _e\"></span>d by an amount of \u20ac118.2<span class=\"_ _2\"></span> million along with an increase in share premium of<span class=\"_ _e\"></span> \u20ac471.9 million f<span class=\"_ _2\"></span>or which 4.739.865 new shares have bee<span class=\"_ _e\"></span>n issued at a<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>subscription price<span class=\"_ _2\"></span> of \u20ac124.5 per share. \u20ac6.9 million of costs were incurred in relation to the capital increas<span class=\"_ _e\"></span><span class=\"ff3f\">e.  </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> extraordinary shareholders' meeting held on 21 June<span class=\"_ _e\"></span> 2022 decided<span class=\"_ _2\"></span> to execute a capital increase in two steps/periods (one in </span></span>2022 for a maximum of <span class=\"_ _2\"></span>\u20ac5.0<span class=\"ff3f\"> </span>million and the other in 2023 <span class=\"_ _e\"></span>for a maximum of \u20ac1.0<span class=\"ff3f\"> </span>million), for a total maximum amount of \u20ac6.0 million for<span class=\"_ _2\"></span> its Belgian employees. Th<span class=\"_ _e\"></span>e first tranche of this capital increase for employees took place in December 2022. The transact<span class=\"_ _2\"></span>ion resulted in the creation of 47,920 new shares for a total amount of \u20ac5.0 million, consisting of <span class=\"ff3f ls5b\">a </span>\u20ac<span class=\"_ _e\"></span>1.2 million <span class=\"ff3f\">capital </span>increase and a \u20ac3.8<span class=\"_ _2\"></span> million increa<span class=\"ff3f\">se in<span class=\"_ _e\"></span> share premium. </span>In 2021, the<span class=\"_ _2\"></span> movement was related to the sec<span class=\"_ _e\"></span>ond tranche of the 2020 capital increase for Elia employees completed in March 2021. Th<span class=\"ls1c\">is<span class=\"ls0\"> capital increase resulted in the creation of 7,360 additional shares without nominal value for a total amount of 0<span class=\"_ _e\"></span>.2 million capital </span></span>increase and a \u20ac0.4<span class=\"ff3f\"> million increase in share pr<span class=\"_ _2\"></span>emium.<span class=\"_ _e\"></span> </span>RESERVES <span class=\"_ _74\"> </span> In line with Belg<span class=\"_ _2\"></span>ian legislation, 5% of the Company's statu<span class=\"_ _e\"></span>tory net pro<span class=\"_ _2\"></span>fit must be transferred to the legal reserve each year <span class=\"_ _e\"></span>until the legal reserve<span class=\"_ _2\"></span> represents 10% of the capital. As at 31 Decembe<span class=\"_ _e\"></span>r 2022<span class=\"ls1d\">, </span><span class=\"ff42\">the Group's legal reserve amounts to \u20ac180.2</span> milli<span class=\"_ _e\"></span>on and<span class=\"_ _2\"></span> represents 9.8% of the<span class=\"_ _2\"></span> capital.<span class=\"_ _e\"></span> The Board of <span class=\"_ _2\"></span>Directors can propose the pay-<span class=\"_ _e\"></span>out of a dividend to shareholders totalling up to a maximum of the available reserves plus the profit carried f<span class=\"_ _2\"></span>orward from <span class=\"ff42\">the Company\u2019s </span>previ<span class=\"_ _e\"></span>ous financial year<span class=\"_ _2\"></span>s, including the profit <span class=\"_ _e\"></span>for the financial year ending on <span class=\"ls78\">31<span class=\"_ _2\"></span><span class=\"ls0\"> December </span></span>2022<span class=\"ls0\">. Shareholders must approve the dividend payment <span class=\"_ _e\"></span>at the Annual Ge<span class=\"_ _2\"></span>neral Meeting of Shareholders.<span class=\"_ _e\"></span> </span>HEDGING RESERVE <span class=\"_ _139\"> </span> The hedging reserve compr<span class=\"_ _2\"></span>ises the effective portion of the cumulative net change in fair value of cash flow hedgin<span class=\"_ _e\"></span>g instruments with regard to hedged tr<span class=\"_ _2\"></span>ansactions that have not yet occurred.<span class=\"_ _e\"></span> Since 2021, hedge acco<span class=\"_ _2\"></span>unting is applied to future contracts entered into by 50Hertz for the purpose of reducing the risk of fluct<span class=\"_ _e\"></span>uations in the expe<span class=\"_ _2\"></span>cted amount of grid losses. The fair value of these contracts amounted to \u20ac129.6 million at the end of 2022 <span class=\"_ _e\"></span>(\u20ac355.6 million in 2021)<span class=\"_ _2\"></span>. Considering a deferred tax effect, a net variation of the hedge reserve amounting to -<span class=\"_ _e\"></span><span class=\"ff42\">\u20ac159.1 million was recorded in other </span>comprehensive<span class=\"_ _2\"></span> income in 2022. This negative impact was driven by the drop in energy prices in the last quart<span class=\"_ _e\"></span>er of <span class=\"_ _e\"></span>the year and<span class=\"_ _2\"></span> was partly off<span class=\"_ _2\"></span>set by the new derivatives in which Elia Transmissi<span class=\"_ _e\"></span>on Belgium SA/NV ente<span class=\"_ _2\"></span>red into in 2022 for the pre<span class=\"_ _e\"></span>-hedg<span class=\"_ _e\"></span>ing of probable forecasted debt transactions. T<span class=\"_ _2\"></span>he fair value of these derivatives was \u20ac65.3 million at the end of the<span class=\"ff3f\"> yea<span class=\"_ _e\"></span>r 2022, resulting in a net hedging </span>reserve<span class=\"_ _2\"></span> of \u20ac49.0 million fully recognized in other comprehensive income.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>As the costs for gr<span class=\"_ _2\"></span>id losses are almost fully passed through to the tariffs, the fair value of the future contracts has no re<span class=\"_ _e\"></span>levance for the curren<span class=\"_ _2\"></span>t or future profitability of the company.<span class=\"_ _e\"></span> TREASUR<span class=\"_ _e\"></span>Y SHARES The reserve for <span class=\"_ _e\"></span>the Compa<span class=\"_ _e\"></span>ny\u2019s treasury sha<span class=\"_ _e\"></span>res comprise<span class=\"_ _e\"></span>s the cost <span class=\"_ _e\"></span>of th<span class=\"_ _20\"></span>e Company\u2019s shares <span class=\"_ _e\"></span>held by t<span class=\"_ _e\"></span>he g<span class=\"_ _e\"></span><span class=\"ff3f\">roup. <span class=\"ls95\">On</span> 31 December 2<span class=\"_ _e\"></span>021, </span>the group held 7.248 <span class=\"ff42\">of the Compan<span class=\"_ _2\"></span>y\u2019s shares.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>Number of t<span class=\"_ _2\"></span>reasury shares<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>On 1 January 7,248 0 Repurcha<span class=\"_ _2\"></span>sed during the year<span class=\"_ _e\"></span> 452,289<span class=\"fs8\"> </span>270,331 Sold during<span class=\"_ _2\"></span> the year<span class=\"_ _e\"></span> -446,057<span class=\"fs8\"> </span>-263,083 Number of t<span class=\"_ _2\"></span>reasury shares at the end of the year<span class=\"_ _e\"></span> 13,480 7,248 SHARE-BASED <span class=\"_ _e\"></span>PAYMENTS At 31 <span class=\"_ _e\"></span>May 2021, E<span class=\"_ _e\"></span>urogrid International <span class=\"_ _e\"></span>SA/NV<span class=\"_ _e\"></span><span class=\"ff40\"> </span>h<span class=\"_ _e\"></span>as grant<span class=\"_ _e\"></span>ed 1,640 st<span class=\"_ _e\"></span>ock options <span class=\"_ _e\"></span>to <span class=\"_ _e\"></span>the e<span class=\"_ _e\"></span>mployees of R<span class=\"_ _e\"></span>ealTo BV<span class=\"_ _e\"></span>/SRL and RealTo <span class=\"_ _e\"></span>GmbH at a str<span class=\"_ _2\"></span>ike price of \u20ac100 per stock option at exercise date 31 Mar<span class=\"_ _2\"></span>ch 2024. <span class=\"ff3f\">A<span class=\"_ _e\"></span>s per 14 March 2023, 500 additional stock options have been </span>granted <span class=\"_ _2\"></span>to new <span class=\"_ _2\"></span>employees at <span class=\"_ _2\"></span>the same terms <span class=\"_ _2\"></span>and conditions. In <span class=\"_ _2\"></span>total, 2,1<span class=\"ff42\">20 sto<span class=\"_ _2\"></span>ck options have b<span class=\"_ _2\"></span>een a<span class=\"_ _2\"></span>ccepted, worth \u20ac1,<span class=\"ff3f\">4 million. As pe<span class=\"_ _2\"></span>r </span></span>31 December 2022, 1.140 options ar<span class=\"_ _e\"></span>e still living. T<span class=\"_ _e\"></span>he share-based <span class=\"_ _e\"></span>payments cost amounted to <span class=\"_ _e\"></span><span class=\"ff42 ls5b\">\u20ac0.</span>3<span class=\"_ _e\"></span> million in 202<span class=\"ff42\">2<span class=\"_ _e\"></span> (\u20ac0.2 million)</span>. As<span class=\"_ _e\"></span> the stock option <span class=\"_ _e\"></span>plan<span class=\"_ _e\"></span> concerns <span class=\"_ _e\"></span>shar<span class=\"_ _e\"></span>es in<span class=\"_ _e\"></span> RealTo <span class=\"_ _e\"></span>BV/SR<span class=\"_ _e\"></span>L a<span class=\"_ _e\"></span>nd <span class=\"_ _e\"></span>its <span class=\"_ _e\"></span>parent c<span class=\"_ _e\"></span>ompany, t<span class=\"_ _e\"></span>he s<span class=\"_ _e\"></span>hare<span class=\"_ _20\"></span>-b<span class=\"_ _2\"></span>ased <span class=\"_ _e\"></span>payments <span class=\"_ _e\"></span>are <span class=\"_ _e\"></span>not <span class=\"_ _e\"></span>presented <span class=\"_ _e\"></span>separately in the sta<span class=\"_ _2\"></span>tement of equity.    DIVIDEND After the reporting<span class=\"_ _2\"></span> date, the Board of Directors will put forw<span class=\"_ _e\"></span>ard th<span class=\"_ _2\"></span>e dividend<span class=\"_ _e\"></span> proposal outlined belo<span class=\"ls1c\">w.</span> Dividend (<span class=\"_ _2\"></span>in \u20ac)<span class=\"_ _e\"></span><span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Per ordinary sh<span class=\"_ _2\"></span>are entitled to dividend<span class=\"_ _e\"></span> 1.91 1.75 It was proposed<span class=\"_ _2\"></span> and approved, at the Shareholders\u2019 Meeting convened to approve the Elia Group <span class=\"ff3f\">SA/NV<span class=\"_ _e\"></span> financial statements for the </span>year ended 31 December 202<span class=\"ls78\">1,<span class=\"_ _2\"></span><span class=\"ls0\"> <span class=\"ff42\">to pay a d<span class=\"_ _2\"></span>ividend of \u20ac1.<span class=\"ff3f ls78\">75<span class=\"ls0\"> per share, representing a total payout of </span></span>\u20ac<span class=\"ff3f\">120.3 million. </span></span></span></span>The Board of <span class=\"_ _2\"></span>Directors meeting on <span class=\"ls5b\">30</span> M<span class=\"_ _e\"></span>arch 2023 <span class=\"ls5b\">pr</span><span class=\"ff42\">opos<span class=\"_ _e\"></span>ed a gross dividend of \u20ac1.</span><span class=\"ls78\">91<span class=\"_ _2\"></span><span class=\"ls0\"> per share with regard to 2022. This dividend is </span></span>subject to approval by <span class=\"_ _2\"></span>shareholders at the Annual General Meeting on 1<span class=\"_ _e\"></span>6 May 2023 and is not included as a liability in the Gr<span class=\"ff42\">oup\u2019s </span>consolidated fina<span class=\"_ _2\"></span>ncial statements. The total dividend, ca<span class=\"_ _2\"></span>lculated based on the number of shares outstanding on <span class=\"_ _e\"></span><span class=\"ls5b\">30</span> March 2023 corresponds to a total of <span class=\"ff42\">\u20ac</span>140.4<span class=\"_ _2\"></span> million. Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfShareCapitalReservesAndOtherEquityInterestExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__90": {
   "value": "SHARE C<span class=\"_ _e\"></span>APITAL AND S<span class=\"_ _2\"></span>HARE PREMIUM Number of shares 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Number<span class=\"_ _2\"></span> of issued shares at the beginning of the year<span class=\"_ _e\"></span> 68,728<span class=\"_ _2\"></span>,055<span class=\"_ _e\"></span> 68,720<span class=\"_ _2\"></span>,695<span class=\"_ _e\"></span> Issued against ca<span class=\"_ _2\"></span>sh payment<span class=\"_ _e\"></span> 4,787,784 7,360 Number of i<span class=\"_ _2\"></span>ssued shares at the end of the year<span class=\"_ _e\"></span> 73,515<span class=\"_ _2\"></span>,839<span class=\"_ _e\"></span> 68,728<span class=\"_ _2\"></span>,055<span class=\"_ _e\"></span> Number<span class=\"_ _2\"></span> of treasury shares at the end of the year<span class=\"_ _e\"></span> 13,480 7,248 Number of outstanding<span class=\"_ _2\"></span> shares at the end of the year 73,502<span class=\"_ _2\"></span>,359<span class=\"_ _e\"></span> 68,720<span class=\"_ _2\"></span>,807<span class=\"_ _e\"></span> The capital ha<span class=\"_ _2\"></span>s been modified twice d<span class=\"_ _e\"></span>uring the year 2022<span class=\"ls1d\">: </span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">On 24<span class=\"_ _2\"></span> June 2022, Elia Group SA/NV successfully completed a public offering of new shares <span class=\"_ _2\"></span>to existing shareholder<span class=\"_ _e\"></span>s and an<span class=\"_ _2\"></span>y </span></span>holders of an<span class=\"_ _2\"></span> extra-legal preferential right. Through this offering, the capital of Elia Group SA/NV has increase<span class=\"_ _e\"></span>d by an amount of \u20ac118.2<span class=\"_ _2\"></span> million along with an increase in share premium of<span class=\"_ _e\"></span> \u20ac471.9 million f<span class=\"_ _2\"></span>or which 4.739.865 new shares have bee<span class=\"_ _e\"></span>n issued at a<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>subscription price<span class=\"_ _2\"></span> of \u20ac124.5 per share. \u20ac6.9 million of costs were incurred in relation to the capital increas<span class=\"_ _e\"></span><span class=\"ff3f\">e.  </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> extraordinary shareholders' meeting held on 21 June<span class=\"_ _e\"></span> 2022 decided<span class=\"_ _2\"></span> to execute a capital increase in two steps/periods (one in </span></span>2022 for a maximum of <span class=\"_ _2\"></span>\u20ac5.0<span class=\"ff3f\"> </span>million and the other in 2023 <span class=\"_ _e\"></span>for a maximum of \u20ac1.0<span class=\"ff3f\"> </span>million), for a total maximum amount of \u20ac6.0 million for<span class=\"_ _2\"></span> its Belgian employees. Th<span class=\"_ _e\"></span>e first tranche of this capital increase for employees took place in December 2022. The transact<span class=\"_ _2\"></span>ion resulted in the creation of 47,920 new shares for a total amount of \u20ac5.0 million, consisting of <span class=\"ff3f ls5b\">a </span>\u20ac<span class=\"_ _e\"></span>1.2 million <span class=\"ff3f\">capital </span>increase and a \u20ac3.8<span class=\"_ _2\"></span> million increa<span class=\"ff3f\">se in<span class=\"_ _e\"></span> share premium. </span>In 2021, the<span class=\"_ _2\"></span> movement was related to the sec<span class=\"_ _e\"></span>ond tranche of the 2020 capital increase for Elia employees completed in March 2021. Th<span class=\"ls1c\">is<span class=\"ls0\"> capital increase resulted in the creation of 7,360 additional shares without nominal value for a total amount of 0<span class=\"_ _e\"></span>.2 million capital </span></span>increase and a \u20ac0.4<span class=\"ff3f\"> million increase in share pr<span class=\"_ _2\"></span>emium.<span class=\"_ _e\"></span> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIssuedCapitalExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__91": {
   "value": "RESERVES <span class=\"_ _74\"> </span> In line with Belg<span class=\"_ _2\"></span>ian legislation, 5% of the Company's statu<span class=\"_ _e\"></span>tory net pro<span class=\"_ _2\"></span>fit must be transferred to the legal reserve each year <span class=\"_ _e\"></span>until the legal reserve<span class=\"_ _2\"></span> represents 10% of the capital. As at 31 Decembe<span class=\"_ _e\"></span>r 2022<span class=\"ls1d\">, </span><span class=\"ff42\">the Group's legal reserve amounts to \u20ac180.2</span> milli<span class=\"_ _e\"></span>on and<span class=\"_ _2\"></span> represents 9.8% of the<span class=\"_ _2\"></span> capital.<span class=\"_ _e\"></span> The Board of <span class=\"_ _2\"></span>Directors can propose the pay-<span class=\"_ _e\"></span>out of a dividend to shareholders totalling up to a maximum of the available reserves plus the profit carried f<span class=\"_ _2\"></span>orward from <span class=\"ff42\">the Company\u2019s </span>previ<span class=\"_ _e\"></span>ous financial year<span class=\"_ _2\"></span>s, including the profit <span class=\"_ _e\"></span>for the financial year ending on <span class=\"ls78\">31<span class=\"_ _2\"></span><span class=\"ls0\"> December </span></span>2022<span class=\"ls0\">. Shareholders must approve the dividend payment <span class=\"_ _e\"></span>at the Annual Ge<span class=\"_ _2\"></span>neral Meeting of Shareholders.<span class=\"_ _e\"></span> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfReservesAndOtherEquityInterestExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__93": {
   "value": "TREASUR<span class=\"_ _e\"></span>Y SHARES The reserve for <span class=\"_ _e\"></span>the Compa<span class=\"_ _e\"></span>ny\u2019s treasury sha<span class=\"_ _e\"></span>res comprise<span class=\"_ _e\"></span>s the cost <span class=\"_ _e\"></span>of th<span class=\"_ _20\"></span>e Company\u2019s shares <span class=\"_ _e\"></span>held by t<span class=\"_ _e\"></span>he g<span class=\"_ _e\"></span><span class=\"ff3f\">roup. <span class=\"ls95\">On</span> 31 December 2<span class=\"_ _e\"></span>021, </span>the group held 7.248 <span class=\"ff42\">of the Compan<span class=\"_ _2\"></span>y\u2019s shares.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>Number of t<span class=\"_ _2\"></span>reasury shares<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>On 1 January 7,248 0 Repurcha<span class=\"_ _2\"></span>sed during the year<span class=\"_ _e\"></span> 452,289<span class=\"fs8\"> </span>270,331 Sold during<span class=\"_ _2\"></span> the year<span class=\"_ _e\"></span> -446,057<span class=\"fs8\"> </span>-263,083 Number of t<span class=\"_ _2\"></span>reasury shares at the end of the year<span class=\"_ _e\"></span> 13,480 7,248",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTreasurySharesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__95": {
   "value": "SHARE-BASED <span class=\"_ _e\"></span>PAYMENTS At 31 <span class=\"_ _e\"></span>May 2021, E<span class=\"_ _e\"></span>urogrid International <span class=\"_ _e\"></span>SA/NV<span class=\"_ _e\"></span><span class=\"ff40\"> </span>h<span class=\"_ _e\"></span>as grant<span class=\"_ _e\"></span>ed 1,640 st<span class=\"_ _e\"></span>ock options <span class=\"_ _e\"></span>to <span class=\"_ _e\"></span>the e<span class=\"_ _e\"></span>mployees of R<span class=\"_ _e\"></span>ealTo BV<span class=\"_ _e\"></span>/SRL and RealTo <span class=\"_ _e\"></span>GmbH at a str<span class=\"_ _2\"></span>ike price of \u20ac100 per stock option at exercise date 31 Mar<span class=\"_ _2\"></span>ch 2024. <span class=\"ff3f\">A<span class=\"_ _e\"></span>s per 14 March 2023, 500 additional stock options have been </span>granted <span class=\"_ _2\"></span>to new <span class=\"_ _2\"></span>employees at <span class=\"_ _2\"></span>the same terms <span class=\"_ _2\"></span>and conditions. In <span class=\"_ _2\"></span>total, 2,1<span class=\"ff42\">20 sto<span class=\"_ _2\"></span>ck options have b<span class=\"_ _2\"></span>een a<span class=\"_ _2\"></span>ccepted, worth \u20ac1,<span class=\"ff3f\">4 million. As pe<span class=\"_ _2\"></span>r </span></span>31 December 2022, 1.140 options ar<span class=\"_ _e\"></span>e still living. T<span class=\"_ _e\"></span>he share-based <span class=\"_ _e\"></span>payments cost amounted to <span class=\"_ _e\"></span><span class=\"ff42 ls5b\">\u20ac0.</span>3<span class=\"_ _e\"></span> million in 202<span class=\"ff42\">2<span class=\"_ _e\"></span> (\u20ac0.2 million)</span>. As<span class=\"_ _e\"></span> the stock option <span class=\"_ _e\"></span>plan<span class=\"_ _e\"></span> concerns <span class=\"_ _e\"></span>shar<span class=\"_ _e\"></span>es in<span class=\"_ _e\"></span> RealTo <span class=\"_ _e\"></span>BV/SR<span class=\"_ _e\"></span>L a<span class=\"_ _e\"></span>nd <span class=\"_ _e\"></span>its <span class=\"_ _e\"></span>parent c<span class=\"_ _e\"></span>ompany, t<span class=\"_ _e\"></span>he s<span class=\"_ _e\"></span>hare<span class=\"_ _20\"></span>-b<span class=\"_ _2\"></span>ased <span class=\"_ _e\"></span>payments <span class=\"_ _e\"></span>are <span class=\"_ _e\"></span>not <span class=\"_ _e\"></span>presented <span class=\"_ _e\"></span>separately in the sta<span class=\"_ _2\"></span>tement of equity.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSharebasedPaymentArrangementsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__96": {
   "value": "DIVIDEND After the reporting<span class=\"_ _2\"></span> date, the Board of Directors will put forw<span class=\"_ _e\"></span>ard th<span class=\"_ _2\"></span>e dividend<span class=\"_ _e\"></span> proposal outlined belo<span class=\"ls1c\">w.</span> Dividend (<span class=\"_ _2\"></span>in \u20ac)<span class=\"_ _e\"></span><span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Per ordinary sh<span class=\"_ _2\"></span>are entitled to dividend<span class=\"_ _e\"></span> 1.91 1.75 It was proposed<span class=\"_ _2\"></span> and approved, at the Shareholders\u2019 Meeting convened to approve the Elia Group <span class=\"ff3f\">SA/NV<span class=\"_ _e\"></span> financial statements for the </span>year ended 31 December 202<span class=\"ls78\">1,<span class=\"_ _2\"></span><span class=\"ls0\"> <span class=\"ff42\">to pay a d<span class=\"_ _2\"></span>ividend of \u20ac1.<span class=\"ff3f ls78\">75<span class=\"ls0\"> per share, representing a total payout of </span></span>\u20ac<span class=\"ff3f\">120.3 million. </span></span></span></span>The Board of <span class=\"_ _2\"></span>Directors meeting on <span class=\"ls5b\">30</span> M<span class=\"_ _e\"></span>arch 2023 <span class=\"ls5b\">pr</span><span class=\"ff42\">opos<span class=\"_ _e\"></span>ed a gross dividend of \u20ac1.</span><span class=\"ls78\">91<span class=\"_ _2\"></span><span class=\"ls0\"> per share with regard to 2022. This dividend is </span></span>subject to approval by <span class=\"_ _2\"></span>shareholders at the Annual General Meeting on 1<span class=\"_ _e\"></span>6 May 2023 and is not included as a liability in the Gr<span class=\"ff42\">oup\u2019s </span>consolidated fina<span class=\"_ _2\"></span>ncial statements. The total dividend, ca<span class=\"_ _2\"></span>lculated based on the number of shares outstanding on <span class=\"_ _e\"></span><span class=\"ls5b\">30</span> March 2023 corresponds to a total of <span class=\"ff42\">\u20ac</span>140.4<span class=\"_ _2\"></span> million. Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDividendsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__12": {
   "value": "1.91",
   "decimals": 2,
   "dimensions": {
    "concept": "ifrs-full:DividendsProposedOrDeclaredBeforeFinancialStatementsAuthorisedForIssueButNotRecognisedAsDistributionToOwnersPerShare",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR/xbrli:shares"
   }
  },
  "s8_notes__5__13": {
   "value": "1.75",
   "decimals": 2,
   "dimensions": {
    "concept": "ifrs-full:DividendsRecognisedAsDistributionsToOwnersPerShare",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR/xbrli:shares"
   }
  },
  "s8_notes__5__14": {
   "value": "140400000",
   "decimals": -5,
   "dimensions": {
    "concept": "ifrs-full:DividendsProposedOrDeclaredBeforeFinancialStatementsAuthorisedForIssueButNotRecognisedAsDistributionToOwners",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:EUR"
   }
  },
  "s8_notes__5__99": {
   "value": "6.13. <span class=\"_ _92\"> </span>Int<span class=\"_ _e\"></span>erest-bearing loans, borrowings and lease liabilities (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Non-current borrowings 7,638.6 7,658.2 Lease liab<span class=\"_ _2\"></span>ilities \u2212<span class=\"ff3f\"> non-current </span>77.0 83.7 Subtotal non-cu<span class=\"_ _2\"></span>rrent borr<span class=\"_ _e\"></span>owings 7,715.6 7,741.7 Curren<span class=\"_ _2\"></span>t borrowings<span class=\"_ _e\"></span> 772.0 82.3 Lease liab<span class=\"_ _2\"></span>ilities \u2212 current<span class=\"ff3f\"> </span>13.2 35.1 Accrued interest 81.9 76.4 Subtotal current loan<span class=\"_ _2\"></span>s and borr<span class=\"_ _e\"></span>owings 867.2 194.0 Total 8,582.8 7,935.7 The tables be<span class=\"_ _2\"></span>low show the changes in the g<span class=\"_ _e\"></span>roup's liabilities arising from financing activities, in<span class=\"_ _2\"></span>cluding changes arising from <span class=\"_ _e\"></span>both cash flows and non-cash changes. Non-current interest-Current interest-bearing loans (in \u20ac million)<span class=\"ff40\"> </span>bearing loans and<span class=\"_ _2\"></span> Total and borrowings borrowings Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 805.5 7,249.6 8,055.1 Cash flow: r<span class=\"_ _2\"></span>epayment of borrowings<span class=\"_ _e\"></span> (722.3) (15.4) (737.7) Cash flow: procee<span class=\"_ _2\"></span>ds from withdrawal borrowings<span class=\"_ _e\"></span> 60.0 498.0 558.0 Accrued interest 5.4 0.0 5.4 Other 45.4 9.5 54.9 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 193.9 7,741.7 7,935.7 Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 193.9 7,741.7 7,935.7 Cash flow: r<span class=\"_ _2\"></span>epayment of borrowings<span class=\"_ _e\"></span> (82.3) (13.3) (95.8) Cash flow: procee<span class=\"_ _2\"></span>ds from withdrawal borrowings<span class=\"_ _e\"></span> 0.0 747.4 747.4 Accrued interest 5.5 0.2<span class=\"fs8\"> </span>5.7 Other 750.2 (760.4) (10.2) Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 867.2 7,715.6 8,582.8 During the year 2021, th<span class=\"_ _2\"></span>e group (Eu<span class=\"_ _e\"></span>rogrid GmbH) paid back <span class=\"ff42\">the revolving credit facilities (\u20ac700 million) that were temporarily contracted </span>to finance the EEG d<span class=\"_ _2\"></span>eficit at the end of 2020. Elia Group had issu<span class=\"ff42\">ed an Eurobond of \u20ac500.0 million with maturity date 2033 and an </span>interest rate<span class=\"_ _2\"></span> of 0.88%. The group also <span class=\"ff42\">iss<span class=\"_ _e\"></span>ued commercial papers for total amount of \u20ac60.0 m<span class=\"_ _2\"></span>illion with <span class=\"_ _e\"></span><span class=\"ff3f\">maturity date 2022 and an </span></span>interest rate <span class=\"ls5b\">of</span> -<span class=\"ff42\">0.15% under its commercial paper program of \u20ac</span>300.0 million.<span class=\"_ _e\"></span> In 2022, Eurogrid GmbH ha<span class=\"_ _2\"></span>s secured liquidity for the further grid expansion necessary for the energy transition with the issu<span class=\"_ _e\"></span>ance of a \u00e9<span class=\"ff42\">second Green Bond in<span class=\"_ _2\"></span> the amount of \u20ac750.0 million at a rate of 3.279% and a term of nine years. Repayment<span class=\"ff3f\">s<span class=\"_ _e\"></span> of borrowing 2022 </span></span>mainly re<span class=\"_ _2\"></span>late to the closing of the commercial paper program (-<span class=\"ff42\">\u20ac60.0 million) <span class=\"_ _e\"></span></span><span class=\"ls5b\">and </span>the capital repayment of the <span class=\"ff42\">amor<span class=\"_ _e\"></span>tizing loans (\u20ac22.0 </span>million). Movements in 'Other' during the financia<span class=\"_ _2\"></span>l year 2022 <span class=\"_ _e\"></span>mainly relates to reclassifications of long-term debt to short-term debt based on when instrumen<span class=\"_ _2\"></span>ts become due in 2023.<span class=\"_ _e\"></span> Information <span class=\"ls78\">on<span class=\"_ _4b\"></span><span class=\"ls0\"> the<span class=\"_ _e\"></span> terms and conditions of outstanding interest-bearing loans and borrowings is outlined below: </span></span>As per 31 De<span class=\"_ _2\"></span>cember 202<span class=\"ls5b\">2:<span class=\"_ _e\"></span></span> Redemption (in \u20ac million)<span class=\"ff40\"> </span>Matu<span class=\"_ _2\"></span>rity<span class=\"_ _e\"></span> Amount Interest rate schedule Eurobond issues 2013/15 years 2028<span class=\"ls0\"> </span>At maturity 548.0 3.25% Eurobond issues 2013/20 years 2033<span class=\"ls0\"> </span>At maturity 199.3 3.50% Eurobond issues 2014/15 years 2029<span class=\"ls0\"> </span>At maturity 347.6 3.00% Eurobond issues 2015/8.5 years 2024<span class=\"ls0\"> </span>At maturity 499.6 1.38% Eurobond issues 2017/10 years 2027<span class=\"ls0\"> </span>At maturity 248.5 1.38% Senior bo<span class=\"_ _2\"></span>nd 2018/10 years 2028<span class=\"ls0\"> </span>At maturity 298.3 1.50% Eurobond issues 2019/7 year<span class=\"_ _2\"></span>s 2026<span class=\"ls0\"> </span>At maturity 499.0 1.38% Eurobond issues 2020/10 years 2030<span class=\"ls0\"> </span>At maturity 790.9 0.88% Amortising term loan 2033<span class=\"ls0\"> </span>Linear 167.8 1.80% Amortising bond - 7,7 years 2028<span class=\"ls0\"> </span>Linear 50.3 1.56% Amortising bond - 23,7 years 2044<span class=\"ls0\"> </span>Linear 132.4 1.56% European Investment <span class=\"_ _2\"></span>Bank<span class=\"_ _e\"></span> 2025<span class=\"ls0\"> </span>At maturity 100.0 1.08% Commer<span class=\"_ _2\"></span>cial Paper<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>At maturity 0.0 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2025<span class=\"ls0\"> </span>At maturity 499.0 1.875% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2015 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2023<span class=\"ls0\"> </span>At maturity 749.7 1.625% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2015 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2030<span class=\"ls0\"> </span>At maturity 139.4 2.625% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2015 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2028<span class=\"ls0\"> </span>At maturity 748.0 1.500% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2016 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2032<span class=\"ls0\"> </span>At maturity 747.7 1.113% p.a<span class=\"_ _2\"></span>. (fixed) <span class=\"_ _e\"></span> Programme 2020 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2031<span class=\"ls0\"> </span>At maturity 747.4 3,279% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Programme 2021 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2040<span class=\"ls0\"> </span>At maturity 199.5 0,875% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Programme 2020 Bond as part of <span class=\"_ _2\"></span>Debt Issuance 2033<span class=\"ls0\"> </span>At maturity 498.3 0,741% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Programme 2021 Registered bond 2014 2044<span class=\"ls0\"> </span>At maturity 50.0 3,000% p.a<span class=\"_ _2\"></span>. (fixed)<span class=\"_ _e\"></span> Loan with KF<span class=\"_ _2\"></span>W<span class=\"_ _e\"></span> 2026<span class=\"ls0\"> </span>At maturity 150.0 0.90% Total 8,410.7 Lease debts 90.2 Accrued interests 81.9 Total Loan<span class=\"_ _2\"></span>s and Borrowings 8,582.8 (Current and Non-current) As per 31 De<span class=\"_ _2\"></span>cember 2021:<span class=\"_ _e\"></span> Redemption (in \u20ac million)<span class=\"ff40\"> </span>Matu<span class=\"_ _2\"></span>rity<span class=\"_ _e\"></span> Amount Interest rate schedule Eurobond issues 2013/15 years 2028<span class=\"ls0\"> </span>At maturity 547.7 3.25% Eurobond issues 2013/20 years 2033<span class=\"ls0\"> </span>At maturity 199.2 3.50% Eurobond issues 2014/15 years 2029<span class=\"ls0\"> </span>At maturity 347.2 3.00% Eurobond issues 2015/8.5 years 2024<span class=\"ls0\"> </span>At maturity 499.1 1.38% Eurobond issues 2017/10 years 2027<span class=\"ls0\"> </span>At maturity 248.2 1.38% Senior bo<span class=\"_ _2\"></span>nd 2018/10 years 2028<span class=\"ls0\"> </span>At maturity 297.9 1.50% Eurobond issues 2019/7 years 2026<span class=\"ls0\"> </span>At maturity 498.6 1.38% Eurobond issues 2020/10 years 2030<span class=\"ls0\"> </span>At maturity 789.7 0.88% Amortising term loan 2033<span class=\"ls0\"> </span>Linear 181.7 1.80% Amortising bond - 7,7 years 2028<span class=\"ls0\"> </span>Linear 58.7 1.56% Amortising bond - 23,7 years 2044<span class=\"ls0\"> </span>Linear 132.3 1.56% European Investment <span class=\"_ _2\"></span>Bank<span class=\"_ _e\"></span> 2025<span class=\"ls0\"> </span>At maturity 100.0 1.08% Commer<span class=\"_ _2\"></span>cial Paper<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>At maturity 60.0 -0.15% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2015<span class=\"_ _e\"></span> 2025<span class=\"ls0\"> </span>At maturity 498.6 1.88% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2015<span class=\"_ _e\"></span> 2023<span class=\"ls0\"> </span>At maturity 749.4 1.63% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2015<span class=\"_ _e\"></span> 2030<span class=\"ls0\"> </span>At maturity 139.3 2.63% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2016<span class=\"_ _e\"></span> 2028<span class=\"ls0\"> </span>At maturity 747.7 1.50% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2020<span class=\"_ _e\"></span> 2032<span class=\"ls0\"> </span>At maturity 747.4 1.11% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2020<span class=\"_ _e\"></span> 2040<span class=\"ls0\"> </span>At maturity 199.4 0.88% Bond as part of <span class=\"_ _2\"></span>Debt Issuance Programme 2021<span class=\"_ _e\"></span> 2033<span class=\"ls0\"> </span>At maturity 498.1 0.88% Registered bond 2014 2044<span class=\"ls0\"> </span>At maturity 50.0 3.00% Loan with KfW 2026<span class=\"ls0\"> </span>At maturity 150.0 0.90% Total 7,740.5 Lease debts 118.8 Accrued interests 76.4 Total Loan<span class=\"_ _2\"></span>s and Borrowings (Current and Non-curr<span class=\"_ _e\"></span>ent) 7,935.7 Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBorrowingsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__102-1": {
   "value": "6.14. <span class=\"_ _92\"> </span>Employee ben<span class=\"_ _e\"></span>efits The group<span class=\"_ _2\"></span> has various legal and constructive defined ben<span class=\"_ _e\"></span>efit obligations linked<span class=\"_ _2\"></span> to its Belgian and German operations.<span class=\"_ _e\"></span> The total ne<span class=\"_ _2\"></span>t liability for employee-benefit obligations is a<span class=\"_ _e\"></span>s follows: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany Total Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany Total Defined benefit p<span class=\"_ _2\"></span>lans<span class=\"_ _e\"></span> 4.3 20.9 25.1 28.6 34.0 62.6 Post-emplo<span class=\"_ _2\"></span>yment benefits other than pensions<span class=\"_ _e\"></span> 47.6 4.3 51.9 36.2 7.9 44.0 Subtotal 51.9 25.2 77.1 64.8 41.8 106.6 Other (non actuar<span class=\"_ _2\"></span>ial provision)<span class=\"_ _e\"></span> 1.0 1.0 0.0 Total prov<span class=\"_ _2\"></span>isions for employee benefits 51.9 26.2 78.1 64.8 41.8 106.6 Of the \u20ac<span class=\"ff3f\">78.1 million in employe<span class=\"_ _2\"></span>e benefits pr<span class=\"_ _e\"></span>ovisions recognised at the end of the financial year 2022<span class=\"ff42 ls1d\">, \u20ac</span>75.0 million <span class=\"_ _e\"></span>is presented in the </span>long term and \u20ac<span class=\"ff3f\">3.2 million in the short term (see Note 6.14<span class=\"ls8f\">).</span> </span>BELGIUM DEFINED-CONTRIBUTION PLAN Employees remunera<span class=\"_ _2\"></span>ted based on a salary scale and rec<span class=\"_ _e\"></span>ruited after<span class=\"_ _2\"></span> 1 June 2002, as well as management staff recruited after 1<span class=\"_ _e\"></span> May 1999 are co<span class=\"_ _2\"></span>vered by two defined-contribution pension plans (Powerbel and Enerbel): <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> Enerbel plan is a plan for<span class=\"ff40\"> </span>salaried employees hired after 1 June 2002, to which the employee and the employer contribute </span></span>based on predefined formula<span class=\"_ _2\"></span>.  \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">The<span class=\"_ _2\"></span> Powerbel plan is a plan for managers hired after 1 May 1999. The contributions of the employee and employer are based on </span></span>a fixed <span class=\"ff42\">percen<span class=\"_ _2\"></span>tage of the employee\u2019s salary. <span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>The new law regard<span class=\"_ _2\"></span>ing occupational pension plans, published at the end of 2015, made various changes to t<span class=\"_ _e\"></span>he guaranteed return on defined-contr<span class=\"_ _2\"></span>ibution plans. For payments made after 1 January 2016, the law requires emp<span class=\"_ _e\"></span>loyers to guarantee an average annual return of at lea<span class=\"_ _2\"></span>st 1.75% (up to 3.75% depending on who contributes) over the course of <span class=\"_ _e\"></span><span class=\"ff42\">each employee\u2019s career.</span> For insured<span class=\"_ _2\"></span> plans the minimum guaranteed return until 31<span class=\"_ _e\"></span> December 2015 still ne<span class=\"_ _2\"></span>eds to be equivalent to at le<span class=\"_ _e\"></span>ast 3.25% for the employer\u2019s contr<span class=\"_ _2\"></span>ibution and 3.75% for the employee's contribution, with any shortfall<span class=\"_ _e\"></span><span class=\"ff3f\"> being covered by the employer.<span class=\"_ _e\"></span> </span>As a result o<span class=\"_ _2\"></span>f the above changes and as mentioned in the<span class=\"_ _e\"></span> accounting policies, all defined-contribution pension plans under Belgian pension legislation are classified as defined-benefit plans for accounting purposes, due to the legal minimum return to be guaranteed by the employer<span class=\"_ _2\"></span>, which represents a plan amendment. They <span class=\"_ _e\"></span>are accounted for using the Projected Unit Credit method <span class=\"_ _e\"></span>(PUC-method). For each plan, the<span class=\"_ _2\"></span> fair value of assets equals the sum of the accrued individual reserves (if any) and the value of the collectiv<span class=\"_ _20\"></span>e fu<span class=\"_ _2\"></span>nd(s) (if any), hence no ap<span class=\"_ _2\"></span>plication of IAS 19 \u00a7 115. In addition, with the exception of Enerbel, the <span class=\"_ _e\"></span>defi<span class=\"ls5b\">ned</span>-c<span class=\"_ _e\"></span>ontributions (<span class=\"ls1c\">DC</span>) plans are not backloaded, as su<span class=\"_ _2\"></span>ch these plans are valued without projection of future contributions. The Enerbel DC plan is backloaded and <span class=\"_ _e\"></span>this plan is valued with proje<span class=\"_ _2\"></span>ction of future contributions<span class=\"_ _e\"></span>.<span class=\"fs11\">  </span>Elia Transm<span class=\"_ _2\"></span>ission Belgium has transferred certain acquired reserves guaranteed by the insurers to 'Cash balance <span class=\"_ _20\"></span><span class=\"ff42\">\u2013</span> b<span class=\"_ _2\"></span>est of' plans since 2016. The main objective o<span class=\"_ _2\"></span>f these plans is to guarantee for every subscriber a minimum guaranteed return of 3.25% on the acquired reserve<span class=\"_ _2\"></span>s until retirement age. <span class=\"_ _e\"></span> Both emplo<span class=\"_ _2\"></span>yee' and employer' contributions are paid on a monthly basis for the base plans. The employee' contribution is dedu<span class=\"_ _e\"></span>cted from the<span class=\"ls1c\">ir</span> <span class=\"_ _2\"></span>salary and paid to the insurer by the employer. The amount of future cash flows <span class=\"_ _e\"></span>depends on wage growth. DEFINED-BENEFIT PLANS For a<span class=\"_ _2\"></span> closed population, collective agreements in the electricity and gas industries provide \u2018pension supplements\u2019 based on t<span class=\"_ _e\"></span><span class=\"ff3f\">he annual </span>salary and an emplo<span class=\"_ _2\"></span>yee\u2019s career within a company (partial<span class=\"_ _e\"></span>ly revertib<span class=\"_ _2\"></span>l<span class=\"ff3f\">e<span class=\"_ _e\"></span> to the inheritor in case of early death of the employee).The </span>benefits gran<span class=\"_ _2\"></span>ted are linked to Elia\u2019s operating result. There is no external pension fund or group insurance for these liabil<span class=\"_ _e\"></span><span class=\"ff3f\">ities, which </span>means that n<span class=\"_ _2\"></span>o reserves are constituted with third parties. <span class=\"_ _e\"></span>The obligations are classified as a defined-benefit. The co<span class=\"_ _2\"></span>llective agreement determines that active staff hired between 1 Ja<span class=\"_ _e\"></span>nuary 1993 and 31 December 2001 and all managerial/e<span class=\"_ _2\"></span>xecutive staff hired prior to 1 May 1999 wil<span class=\"_ _e\"></span>l be granted the same guarantees via a defined-benefit pension scheme (Elgabel and Pensiobel <span class=\"ff42\">\u2013</span> closed plan<span class=\"_ _2\"></span>s). Obligations under these d<span class=\"_ _e\"></span>efined-benefit pension plans are funded by a number of pension funds for the electricity and ga<span class=\"_ _2\"></span>s industries and by insurance companies.<span class=\"_ _e\"></span> As mentioned abo<span class=\"_ _2\"></span>ve, Elia Transmission Belgium has transferred certain acquired reserves guaranteed by the insurers to 'Cash balance \u2013<span class=\"ff3f\"> best o<span class=\"_ _2\"></span>f' plans since 2016. As this guarantee is an empl<span class=\"_ _e\"></span>oyer obligation, these plans represent defined-benefit plans. </span>Both emplo<span class=\"_ _2\"></span>yees' and employers' contributions are paid o<span class=\"_ _e\"></span>n a monthly basis for the base plans. The emp<span class=\"_ _2\"></span>loyee's contribution is deducted from the salary and<span class=\"_ _2\"></span> paid to the insurer by the employer.<span class=\"_ _e\"></span> OTHER PERSONNEL OBLIGATIONS <span class=\"_ _250\"> </span> Elia Transm<span class=\"_ _2\"></span>ission (Belgium) has also granted staff certain early<span class=\"_ _e\"></span>-retirement schemes and other post-employment benefits such as reimbursement of med<span class=\"_ _2\"></span>ical expenses and a contribution to <span class=\"_ _e\"></span>their energy bills, as well as other long-term benefits (seniority payments). Not all of the<span class=\"_ _2\"></span>se benefits are funded and, in accordance with I<span class=\"_ _e\"></span>AS<span class=\"_ _e\"></span> 19, these<span class=\"_ _2\"></span> post-employment benefits are classified as defined-benefit plans.<span class=\"_ _e\"></span> GERMANY<span class=\"ff3f fs8\"> </span>DEFINED CONTRIBUTION PLANS In <span class=\"_ _2\"></span>the case <span class=\"_ _2\"></span>of externally fin<span class=\"_ _2\"></span>anced defined contribution <span class=\"_ _2\"></span>plans, 5<span class=\"_ _2\"></span>0Hertz Tr<span class=\"_ _e\"></span><span class=\"ff42\">ansmission <span class=\"_ _2\"></span>(Germany)\u2019s obligation <span class=\"_ _2\"></span>is limited to <span class=\"_ _2\"></span>paying <span class=\"_ _2\"></span>the agreed<span class=\"_ _e\"></span> </span>contribu<span class=\"_ _2\"></span>tions. <span class=\"_ _e\"></span>For <span class=\"_ _e\"></span>those <span class=\"_ _e\"></span>defined <span class=\"_ _e\"></span>contribution <span class=\"_ _e\"></span>plans<span class=\"_ _e\"></span> recog<span class=\"_ _e\"></span>nised in<span class=\"_ _e\"></span> the<span class=\"_ _e\"></span> fo<span class=\"_ _e\"></span>rm <span class=\"_ _e\"></span>of <span class=\"_ _e\"></span>direct <span class=\"_ _e\"></span>guarantees, <span class=\"_ _e\"></span>there a<span class=\"_ _e\"></span>re <span class=\"_ _e\"></span>pledged <span class=\"_ _e\"></span>congruent <span class=\"_ _20\"></span><span class=\"ff42\">employer\u2019s </span>liability insuran<span class=\"_ _2\"></span>ce policies in place.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Pension o<span class=\"_ _2\"></span>bligations for executives (agreement with staff representatives from 2003 onwards): individual contractual pension </span></span>obligation<span class=\"_ _2\"></span>s based on an agreement with representatives;<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Pension o<span class=\"_ _2\"></span>bligations for executives (agreement with staff representatives from 19 August 200<span class=\"_ _e\"></span>8 onwards): individual contra<span class=\"_ _2\"></span>ctual </span></span>pension obligatio<span class=\"_ _2\"></span>ns relating to a company pension plan with the Vattenfall Europe Group;<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Collective b<span class=\"_ _2\"></span>argaining agreement on the company pension scheme: obligations based on the collective bargaining agreement </span></span>made in<span class=\"_ _2\"></span> relation to <span class=\"ff42\">50Hertz Transmission\u2019s company pension scheme, concluded on 28</span> N<span class=\"_ _e\"></span>ovember 2007; \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Direct insu<span class=\"_ _2\"></span>rance: direct insurance policies for all former employees who worked at Vereinigte Energ<span class=\"_ _2\"></span>iewerke<span class=\"_ _e\"></span> AG (V<span class=\"_ _e\"></span>EAG) from </span></span>1993 to 31 December 2004, with the e<span class=\"_ _2\"></span>xception of ma<span class=\"_ _e\"></span>nagers; \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Individu<span class=\"_ _2\"></span>al commitments: individual commitments which are financed exclusively by external pension funds (welfare fund and </span></span>pension fund). DEFINED-BENEFIT PLANS Defined-benefit<span class=\"_ _2\"></span> plans entitle employees to su<span class=\"_ _e\"></span>bmit direct pension claims <span class=\"ls1d\">to</span> 50Hertz Transmission. Provisions for these are recognised in the statemen<span class=\"_ _2\"></span>t of financial position. If plan assets are creat<span class=\"_ _e\"></span>ed for the so<span class=\"_ _2\"></span>le purpose of fulfilling pension obligations, the a<span class=\"_ _e\"></span>mount is offset against the present <span class=\"_ _2\"></span>value of the obligation. The following <span class=\"_ _e\"></span>defined-benefit plans exist in Germany:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Grou<span class=\"_ _2\"></span>p works agreement regarding the company pension <span class=\"_ _e\"></span>scheme </span></span>In accordance<span class=\"_ _2\"></span> with the group works agreement regarding <span class=\"_ _e\"></span>the company pension scheme, employees are granted a company pension plan on the basis of a<span class=\"_ _2\"></span> defined-contribution plan (effective <span class=\"_ _e\"></span>1 January 2007). This a<span class=\"_ _2\"></span>greement applies to all employees within the meaning of Sec. 5 (1) o<span class=\"_ _2\"></span>f the German Work Constitution Act (BetrVG) and came into effect at the Company on 1 January 2007. Participati<span class=\"_ _e\"></span>on in the scheme is vo<span class=\"_ _2\"></span>luntary. The scheme grants pension benefits<span class=\"_ _e\"></span> to employees once they reach the statutory retirement age, once they take early re<span class=\"_ _2\"></span>tirement from statutory pension insurance, and in the event of occupational disability f<span class=\"_ _e\"></span>or death. Current pens<span class=\"_ _e\"></span>ion benefits are increased by 1% p.a., so the sch<span class=\"_ _2\"></span>eme is classified as a define<span class=\"_ _e\"></span>d-benefit plan. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">TVV Energie </span></span>This pen<span class=\"_ _2\"></span>sion plan relates to direct guarantees resulting from a collective bargaining agreement concl<span class=\"_ _e\"></span>uded on 16 October 1992. It was closed to new hire<span class=\"_ _2\"></span>s on 1 January 1993. This contribution <span class=\"_ _e\"></span>plan app<span class=\"_ _2\"></span>lies to employees who worked at Vereinigte Energiewerke AG until 30 November 2001 an<span class=\"_ _2\"></span>d whose vested benefits were allocated to Vattenfall Europe Transmission GmbH (now <span class=\"_ _e\"></span>50Hertz Transmission GmbH). The scheme covers pension<span class=\"_ _2\"></span> obligations, based on years of service and remuneration level and grants retirement and disability pensions, but no pen<span class=\"_ _2\"></span>sion for surviving dependants. It is n<span class=\"_ _e\"></span>ot possible to inde<span class=\"_ _2\"></span>x current post<span class=\"_ _e\"></span>-employment benefits falling due for the first time after 1 Januar<span class=\"_ _2\"></span>y 1993.<span class=\"_ _e\"></span> OTHER PERSONNEL OBLIGATIONS 50Hertz Tran<span class=\"_ _2\"></span>smission <span class=\"ff42\">also has following obligations, which are listed under \u2018Other personnel obligations\u2019:<span class=\"_ _e\"></span></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Obligatio<span class=\"_ _2\"></span>ns for long-service benefits;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Obligatio<span class=\"_ _2\"></span>ns from German phased retirement schemes;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">Obligatio<span class=\"_ _2\"></span>ns for working lifetime accounts. </span></span>Not all of these b<span class=\"_ _2\"></span>enefits are funded and, in accordance with IAS 19, these post-employment benefits are classified as defined-benefit plans.  EMPLOYEE BEN<span class=\"_ _e\"></span>EFIT OBLIGA<span class=\"_ _2\"></span>TIONS AT GROUP LEVEL  The Group\u2019s <span class=\"_ _2\"></span>net liability for employee benefit obligations is as follows:<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>(in \u20ac million)<span class=\"ff40\"> </span>Pensions Other 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Present value of <span class=\"_ _2\"></span>funded defined benefit obligation<span class=\"_ _e\"></span> (249.6) (298.9) (93.3) (100.1) Fair va<span class=\"_ _2\"></span>lue of plan assets<span class=\"_ _e\"></span> 224.5 236.3 41.3 56.1 Net employee benefit<span class=\"_ _2\"></span> liability (25.1) (62.6) (51.9) (44.0) The net employee<span class=\"_ _2\"></span> benefit liability decreased in total by \u20ac29.5 million, of which \u20ac12.9 million on<span class=\"_ _2\"></span> Belgian level and<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>\u20ac<span class=\"_ _e\"></span>16.6 million on German level. The impact is mainly explained by the increase<span class=\"_ _2\"></span> in discoun<span class=\"_ _e\"></span>t rate compared with 2021 and the lower (negative) return on pla<span class=\"_ _2\"></span>n assets.<span class=\"_ _e\"></span> Movement in the p<span class=\"_ _2\"></span>resent value of the defined benefit obligation<span class=\"_ _e\"></span> Pensions Other (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>At the<span class=\"_ _2\"></span> beginning of the period<span class=\"_ _e\"></span> (298.9) (292.3) (100.1) (110.8) Curren<span class=\"_ _2\"></span>t service cost<span class=\"_ _e\"></span> (15.9) (15.2) (3.1) (10.4) Intere<span class=\"_ _2\"></span>st cost/income<span class=\"_ _e\"></span> (2.9) (1.7) (1.3) (0.6) Contributions fr<span class=\"_ _2\"></span>om plan participants<span class=\"_ _e\"></span> (1.0) (0.9) 0.0 0.0 Including remeasu<span class=\"_ _2\"></span>rement gains/(losses) in OCI and in Statement<span class=\"_ _2\"></span> of profit or loss, arising from<span class=\"_ _e\"></span> 1) Changes in demo<span class=\"_ _2\"></span>graphic assumptions<span class=\"_ _e\"></span> 0.0 0.0 0.0 0.0 2) Changes in f<span class=\"_ _2\"></span>inancial assumptions<span class=\"_ _e\"></span> 57.3 17.7 19.9 3.7 3) Changes from e<span class=\"_ _2\"></span>xperience adjustments (15.5) (5.3) (0.6) (0.3) Past service co<span class=\"_ _2\"></span>st 0.0 0.1 0.0 0.0 Payments from t<span class=\"_ _2\"></span>he plan 16.2 16.8 3.1 2.8 Transfers 11.1 (18.2) (11.1) 15.5 At the<span class=\"_ _2\"></span> end of the period<span class=\"_ _e\"></span> (249.6) (298.9) (93.3) (100.1) Movement in the fa<span class=\"_ _2\"></span>ir value of the plan assets<span class=\"_ _e\"></span> Pensions Other (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>At the<span class=\"_ _2\"></span> beginning of the period<span class=\"_ _e\"></span> 236.3 241.4 56.1 29.6 Intere<span class=\"_ _2\"></span>st income 2.4 1.0 0.0 0.1 Remeasurement ga<span class=\"_ _2\"></span>ins/losses in OCI arising from:<span class=\"_ _e\"></span> Return of plan<span class=\"_ _2\"></span> assets <span class=\"_ _e\"></span> (excluding<span class=\"_ _2\"></span> interest income on plan assets)<span class=\"_ _e\"></span> (35.7) 12.0 (0.3) 3.7 Contributions fr<span class=\"_ _2\"></span>om employer 14.4 10.2 5.9 9.7 Contributions fr<span class=\"_ _2\"></span>om plan participants<span class=\"_ _e\"></span> 1.0 0.9 0.0 0.0 Transfers 19.4 (13.1) (19.4) 15.8 Benefit payments (13.3) (16.2) (0.9) (2.7) At the<span class=\"_ _2\"></span> end of the period<span class=\"_ _e\"></span> 224.5 236.3 41.3 56.1 Amounts<span class=\"_ _2\"></span> recognised in comprehensive income<span class=\"_ _e\"></span> Pensions Other (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Service cost Curren<span class=\"_ _2\"></span>t service cost<span class=\"_ _e\"></span> (15.9) (15.2) 1.8 (4.1) Past service co<span class=\"_ _2\"></span>st 0.0 0.1 0.0 0.0 Settlements 0.6 0.6 0.1 0.1 Net interest on the<span class=\"_ _2\"></span> net defined-benefit liability/(asset)<span class=\"_ _e\"></span> (0.6) (0.7) (1.2) (0.5) Intere<span class=\"_ _2\"></span>st cost on defined-benefit obligation<span class=\"_ _e\"></span> (2.9) (1.7) (1.3) (0.6) Intere<span class=\"_ _2\"></span>st income on plan assets<span class=\"_ _e\"></span> 2.4 1.0 0.0 0.1 Other (0.0) (0.0) 0.0 0.3 Defined-benefit cos<span class=\"_ _2\"></span>ts recognised in profit or loss (15.9) (15.1) 0.6 (4.2) Actuarial gains(/loss<span class=\"_ _2\"></span>es) on defined obligations arising from:<span class=\"_ _e\"></span> 1) Changes in demo<span class=\"_ _2\"></span>graphic assumptions<span class=\"_ _e\"></span> 0.0 0.0 0.0 0.0 2) Changes in f<span class=\"_ _2\"></span>inancial assumptions<span class=\"_ _e\"></span> 57.3 17.7 19.9 3.1 3) Changes from e<span class=\"_ _2\"></span>xperience adjustments (15.5) (5.3) (0.6) (0.1) Return on plan assets (exclud<span class=\"_ _2\"></span>ing interest income on plan assets)<span class=\"_ _e\"></span> (35.7) 12.0 (0.3) 3.7 Remeasurement<span class=\"_ _2\"></span>s of net defined benefit (liability)/asset recogn<span class=\"_ _2\"></span>ised in other comprehensive income (OCI)<span class=\"_ _e\"></span> 6.1 24.5 19.0 6.6 Total (9.8) 9.4 19.6 2.4 Considerin<span class=\"_ _2\"></span>g the actuarial gains or losses recognised in other comprehensive income for the reimbursement right<span class=\"_ _e\"></span>s (-<span class=\"ff42\">\u20ac</span>8.9 million for 2022 - see herea<span class=\"_ _2\"></span>fter), the net impact of the remeasurement of <span class=\"_ _e\"></span>post-employments benefit obligations amounts to +<span class=\"ff42\">\u20ac</span><span class=\"ls78\">16</span>.<span class=\"_ _2\"></span>2 million. (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Breakdown o<span class=\"_ _2\"></span>f defined-<span class=\"_ _e\"></span>benefit obligation by<span class=\"_ _2\"></span> type of plan participants<span class=\"_ _e\"></span> (342.9) (399.0) Active plan participan<span class=\"_ _2\"></span>ts (272.7) (314.9) Term<span class=\"_ _2\"></span>inated plan participants with def.-b<span class=\"_ _e\"></span>enefit entitlements (21.5) (24.8) Retired p<span class=\"_ _2\"></span>lan participants and beneficiaries<span class=\"_ _e\"></span> (48.7) (59.3) Breakdown o<span class=\"_ _2\"></span>f defined-<span class=\"_ _e\"></span>benefit obligation by<span class=\"_ _2\"></span> type of benefits<span class=\"_ _e\"></span> (342.9) (399.0) Retirement an<span class=\"_ _2\"></span>d death benefits<span class=\"_ _e\"></span> (248.4) (288.2) Other post-employment benefit<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> (82.4) (57.3) Seniority pa<span class=\"_ _2\"></span>yments<span class=\"_ _e\"></span> (12.1) (53.6) When determin<span class=\"_ _2\"></span>ing the app<span class=\"_ _e\"></span>ropriate discount rate, the group considers the interest rates of corporate bonds in currencies consistent with the currencie<span class=\"_ _2\"></span>s of the post-employment benefit obligation w<span class=\"_ _e\"></span>ith at least an 'AA' rating or above, as set by an internationally acknowledged rating agency,<span class=\"_ _2\"></span> and extrapolated as needed along the yield curve to correspond with t<span class=\"_ _e\"></span>he expected term of the defined benefit obligation. A stress test is performe<span class=\"_ _2\"></span>d annually. This test verifies that the minimum funding requirements are covered to deal with 'shock<span class=\"_ _e\"></span>s' with probabilities of occurrence of 0.5%.<span class=\"fc1d\"> </span>The members (mostly) c<span class=\"_ _2\"></span>ontribute to the financing of the retirement benefits by paying a personal contribution.<span class=\"_ _e\"></span> Th<span class=\"ls0\">e annual balance of the defined benefit lump sum is financed by the employer through a recurrent allowance, wh<span class=\"_ _e\"></span>ich is expressed as a </span>percen<span class=\"_ _2\"></span>tage of the total payroll of the participants. This percentage is defined by the aggregate cost method and is reviewed <span class=\"_ _e\"></span>annually. This me<span class=\"_ _2\"></span>thod of financing involves smoothing future costs over the remaining period of the plan. The costs are estimat<span class=\"_ _e\"></span>ed on a projected basis (taking into accoun<span class=\"_ _2\"></span>t salary growth and inflation). The assumptions related to salary increase, inflation, employee turnover and age term are defined<span class=\"_ _2\"></span> on the basis of historical data from the Company. The mortality tables used are those corr<span class=\"_ _e\"></span>esponding to t<span class=\"_ _2\"></span>he observed experien<span class=\"_ _2\"></span>ce within the financing vehicle and take into consideration expected changes in mortality. The g<span class=\"_ _e\"></span>roup calculates the net interest on the net defined<span class=\"_ _2\"></span> benefit liability (asset) using the same high-quality bond discount rate (see above) <span class=\"_ _e\"></span>used to measure the de<span class=\"_ _2\"></span>fined benefit obligatio<span class=\"_ _2\"></span>n (net interest approach). These assumpti<span class=\"_ _e\"></span>ons are challenged on a regular basis. Exceptional events (<span class=\"_ _2\"></span>such as modifications ma<span class=\"_ _e\"></span>de to the plan, changes in assumptions and overly short coverage terms) can lead to outstand<span class=\"_ _2\"></span>ing payments from the sponsor.<span class=\"_ _e\"></span> The defined<span class=\"_ _2\"></span> benefit plans expose the Company to actuarial risks such as investment risk, interest<span class=\"_ _e\"></span>-rate risk, longevity risk and salary r<span class=\"_ _2\"></span>isk.<span class=\"_ _e\"></span><span class=\"ff40 fs11\"> </span>Investmen<span class=\"_ _e\"></span>t risk<span class=\"_ _2\"></span> The presen<span class=\"_ _2\"></span>t value of the defined benefit plan liability is calculated using a discount rate which is dete<span class=\"_ _e\"></span>rmined based on high-quality corporate bonds. The<span class=\"_ _2\"></span> difference between the actual return on assets and the interest income on plan assets is included in t<span class=\"_ _e\"></span><span class=\"ls5b\">he </span>remea<span class=\"_ _2\"></span>surements component (OCI). Currently the plan ha<span class=\"_ _e\"></span>s a relative<span class=\"_ _2\"></span>ly balanced range of investments, as shown b<span class=\"_ _e\"></span>elow<span class=\"_ _e\"></span>: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Investments quot<span class=\"_ _2\"></span>ed in an active market<span class=\"_ _e\"></span> 72.44% 71.02% Shares - <span class=\"_ _2\"></span>Eurozone<span class=\"_ _e\"></span> 13.24% 13.99% Shares - outside<span class=\"_ _2\"></span> Eurozone<span class=\"_ _e\"></span> 17.34% 17.98% Government bonds - Eurozone 0.94% 1.31% Other bonds - Eurozone 24.75% 24.85% Other bonds - outside Eurozone 16.18% 12.89% Unquoted invest<span class=\"_ _2\"></span>ments<span class=\"_ _e\"></span> 27.56% 28.98% Qualifying insuran<span class=\"_ _2\"></span>ce contracts<span class=\"_ _e\"></span> 12.23% 10.91% Property 2.21% 2.50% Cash and cash equivalen<span class=\"_ _2\"></span>ts 2.81% 2.82% Other 10.31% 12.76% Total (in %) 100.00% 100.00% Due to the long-term nature of the<span class=\"_ _2\"></span> plan liabilities, it is considered appropriate that a reasonable portion of the plan assets be in<span class=\"_ _2\"></span>vested in<span class=\"_ _20\"></span> equity securities to<span class=\"_ _2\"></span> leverage the return generated by the f<span class=\"_ _e\"></span>und. In<span class=\"_ _2\"></span> Germany, all plan assets are invested in insurance agreements.<span class=\"_ _20\"></span> Inter<span class=\"_ _e\"></span>est risk<span class=\"_ _2\"></span> A decrease<span class=\"_ _2\"></span> in the bond interest rate will increase the plan liability. However, this will be partially offset by an incr<span class=\"_ _e\"></span>ease in the return on the plan<span class=\"_ _2\"></span>\u2019s assets, of which approximately 95% is now invested in pension funds with an expected return of 3<span class=\"ff3f\">.1<span class=\"_ _e\"></span>2<span class=\"ls24\">%.</span> </span>Longev<span class=\"_ _2\"></span>ity risk <span class=\"ff3f\"> </span>The presen<span class=\"_ _2\"></span>t value of the defined benefit plan liability is calculated based on the best estimate of the<span class=\"_ _e\"></span> life expectancy of plan participants both during and a<span class=\"_ _2\"></span>fter their employment. An increase in the life expectancy of the plan participants will increase the plan's l<span class=\"_ _e\"></span>iability. The prospe<span class=\"_ _2\"></span>ctive mortality tables from the IA/BE <span class=\"_ _e\"></span>are used in Belgium and the 2018 Heubeck tables are uesed in Germany. Salary risk  The presen<span class=\"_ _2\"></span>t value of the defined benefit plan liability is calculated based on the future salaries of plan participants. As such, an increase in the salary of <span class=\"_ _2\"></span>the plan participants will increase the plan\u2019<span class=\"_ _e\"></span>s<span class=\"ff3f\"> liability. </span>ACTUARIAL ASSUMPTIONS (in % and years) Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Discount ra<span class=\"_ _2\"></span>te<span class=\"_ _e\"></span> - Pensions - defined benefit p<span class=\"_ _2\"></span>lans and cash balance - best off plans 3.75% 0.83% 3.59% 1.26% - Pensions - defined con<span class=\"_ _2\"></span>tribution plans<span class=\"_ _e\"></span> 3.77% 1.12% - - - Other 3.75% 1.14% 3.59% 1.26% Expected average salar<span class=\"_ _2\"></span>y increase (excluding inflation)<span class=\"_ _e\"></span> 1.00% 1.00% 2.75% 2.15% Expected infla<span class=\"_ _2\"></span>tion<span class=\"_ _e\"></span> 2.10% 1.75% 2.50% 2.00% Expected increase in<span class=\"_ _2\"></span> health benefits (including inflation)<span class=\"_ _e\"></span> 3.10% 2.75% 2.25% 2.25% Expected increase in<span class=\"_ _2\"></span> tariff advantages<span class=\"_ _e\"></span> 2.10% 1.75% - - Average a<span class=\"_ _2\"></span>ssumed retirement age - Employee 63<span class=\"ls0\"> </span>63<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>- Manager 65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>65<span class=\"ls0\"> </span>Life expectancy in y<span class=\"_ _2\"></span>ears of a pensioner retiring at age 65 at clos<span class=\"_ _2\"></span>ing date:*<span class=\"_ _e\"></span> Life expe<span class=\"_ _2\"></span>ctancy for a 65 year old male<span class=\"_ _e\"></span> 19.9 19.9 20.7 20.5 Life expe<span class=\"_ _2\"></span>ctancy for a 65 year old female<span class=\"_ _e\"></span> 23.6 23.6 24.1 24<span class=\"ls0\"> </span>*Mortality tables used: IABE in Belgium, 2018 Heubeck in Germany (in years ) Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Weighted a<span class=\"_ _2\"></span>verage duration of the defined benefit obligati<span class=\"_ _e\"></span>on 8.0                       <span class=\"_ _e\"></span>   <span class=\"ls0\">8.5 <span class=\"_ _e\"></span> </span>23.4 28.7 Weighted a<span class=\"_ _2\"></span>verage duration of the defined contribution plans<span class=\"_ _e\"></span> 9.7                       <span class=\"_ _e\"></span>   <span class=\"ls0\">9.7 <span class=\"_ _e\"></span> </span>n.r. n.r. Weighted a<span class=\"_ _2\"></span>verage duration of the post<span class=\"_ _e\"></span>-employment benefits other than pensions 13.2                       <span class=\"_ _e\"></span> <span class=\"ls0\">13.2 <span class=\"_ _e\"></span> </span>12.7 14.0 In Germany, the liability o<span class=\"_ _2\"></span>f the defined cont<span class=\"_ _e\"></span>ribution plans is complete<span class=\"_ _2\"></span>ly covered by the plan assets. Therefore, no w<span class=\"_ _e\"></span>eighted average duration is necessary and thus not <span class=\"_ _2\"></span>calculated.<span class=\"_ _e\"></span> The a<span class=\"_ _2\"></span>ctual return on plan assets in percentage terms f<span class=\"_ _e\"></span>or 20<span class=\"ls5b\">22</span> was negative, ranged between -2.6% and -18.0% (compared with a range<span class=\"_ _2\"></span> of 2.7% to 12.0%<span class=\"_ _e\"></span> in 2021<span class=\"ls8f\">).</span> Below is an over<span class=\"_ _2\"></span>view of the expected cash outflows for the DB plans:<span class=\"_ _e\"></span> Future expected cash<span class=\"_ _2\"></span> outflows<span class=\"_ _e\"></span> &lt; 12 months 1-5 years 6 <span class=\"ls0\">- 10 years </span>Pensions (4.6) (20.4) (25.3) Other (0.1) (0.3) (0.4) Total (in \u20ac million)<span class=\"ff40\"> </span>(4.7) (20.7) (25.7) There is some degree of uncertainty<span class=\"_ _2\"></span> linked to the above e<span class=\"_ _e\"></span>xpected cash outflows which can be explained by the following factors:<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">differ<span class=\"_ _2\"></span>ences between assumptions and actual data can occur, e.g. retirement age and future salary increase;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">the e<span class=\"_ _2\"></span>xpected cash outflows shown above are based on a closed population and therefore do not incorporate future new hir<span class=\"_ _2\"></span>es;<span class=\"_ _e\"></span> </span></span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">futur<span class=\"_ _2\"></span>e premiums are calculated based on the last known aggregate cost rate, which is reviewed on an annual basis and varies </span></span>depend<span class=\"_ _2\"></span>ing on the return on plan assets, the actu<span class=\"_ _e\"></span>al salary increase<span class=\"_ _2\"></span> as opposed to the assumptions, and unexpected changes in<span class=\"_ _e\"></span> the population<span class=\"_ _2\"></span>. SENSITIVITY ANALYSIS Effect on def<span class=\"_ _2\"></span>ined benefit obligation<span class=\"_ _e\"></span> Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany Increase<span class=\"_ _2\"></span> (+) /<span class=\"_ _e\"></span> Increase<span class=\"_ _2\"></span> (+) / <span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span> Decrease (-) Decrease (-) Impact on the net<span class=\"_ _2\"></span> defined-benefit obligation of an increase in:<span class=\"_ _e\"></span> Discount ra<span class=\"_ _2\"></span>te (0.5% movement) 14.4 4.6 Average sa<span class=\"_ _2\"></span>lary increase <span class=\"_ _e\"></span>- excl. inflation (0.5% movement) (9.2) (2.6) Inflation (0.25<span class=\"_ _2\"></span>% movement)<span class=\"_ _e\"></span> (5.5) (0.2) Increase of h<span class=\"_ _2\"></span>ealthcare care benefits (1.0% movement)<span class=\"_ _e\"></span> (0.1) n.r. Life expe<span class=\"_ _2\"></span>ctancy of pensions (1 year)<span class=\"_ _e\"></span> (3.3) (0.8) REIMBURSEMENT RIGHTS (BELGIUM) As described<span class=\"_ _2\"></span> in Note 6.6, a non-current asset (within other financial assets) is recognised as reimbursement <span class=\"_ _e\"></span>rights linked to the defined benefit obligatio<span class=\"_ _2\"></span>n for the population benefitting from the interest scheme and medical plan liabilities and tariff benefits f<span class=\"_ _e\"></span>or retired Elia employee<span class=\"_ _2\"></span>s. Each change in these liabilities equally affects the corresponding reimburse<span class=\"_ _e\"></span>ment rights under non-current other financial assets. The change<span class=\"_ _2\"></span> in reimbursement rights is presented below:<span class=\"_ _e\"></span> Movement in the p<span class=\"_ _2\"></span>resent value of the reimbursement r<span class=\"_ _e\"></span>ight<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> Pensions Other (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>At the<span class=\"_ _2\"></span> beginning of the period<span class=\"_ _e\"></span> (19.0) (22.6) (27.2) (31.2) Curren<span class=\"_ _2\"></span>t service costs<span class=\"_ _e\"></span> Intere<span class=\"_ _2\"></span>st cost/income<span class=\"_ _e\"></span> (0.1) (0.1) (0.3) (0.2) Actuarial gains(/loss<span class=\"_ _2\"></span>es) on defined obligations arising from:<span class=\"_ _e\"></span> 1) Changes in demo<span class=\"_ _2\"></span>graphic assumptions<span class=\"_ _e\"></span> 0.0 0.0 0.0 0.0 2) Changes in financial assumptions 3.0 0.7 8.4 2.2 3) Changes from e<span class=\"_ _2\"></span>xperience adjustments 0.0 0.4 (2.4) 0.5 Payments from t<span class=\"_ _2\"></span>he plan 2.2 2.5 1.8 1.6 At the<span class=\"_ _2\"></span> end of the period<span class=\"_ _e\"></span> (14.0) (19.0) (19.7) (27.2) The sum of \u2018Pen<span class=\"_ _2\"></span>sions\u2019 (\u20ac14.0 million) and \u2018Other\u2019 (\u20ac19.7 <span class=\"_ _e\"></span>million) re<span class=\"_ _2\"></span>imbursement rights amounted to \u20ac33.7 million i<span class=\"_ _e\"></span>n 2021<span class=\"_ _2\"></span> (2020: \u20ac 46.2 million), which<span class=\"_ _2\"></span> reconciles with the reimbursement rights listed in Note 6.6.<span class=\"_ _e\"></span> Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.15. <span class=\"_ _92\"> </span>Provision<span class=\"_ _e\"></span>s (in \u20ac million)<span class=\"ff40\"> </span>Dismantling Employee Environmen<span class=\"_ _2\"></span>t Elia Re Other Total Obligations benefits Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 11.5 5.4 116.3 1.9 5.6 140.7 Increase 0.3 1.0 2.1 (0.1) 1.9 5.2 Reversals (0.4) (2.0) (9.6) 0.0 (0.8) (12.9) Utilisation (0.1) (0.4) 0.0 (0.1) (0.7) (1.2) Discounting o<span class=\"_ _2\"></span>f provisions<span class=\"_ _e\"></span> (0.0) 0.0 1.4 0.0 0.0 1.4 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 11.2 4.1 110.1 1.7 6.1 133.2 Long<span class=\"ls0\">-term portion<span class=\"_ _e\"></span> </span>9.1 4.1 110.1 0.0 2.2 125.6 Short-term portion 2.1 0.0 0.0 1.7 3.9 7.7 Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 11.2 4.1 110.1 1.7 6.1 133.2 Increase 1.4 2.0 57.9 1.5 1.3 64.2 Reversals (1.0) (2.9) (37.1) 0.0 (1.3) (42.4) Utilisation (0.3) (0.4) 0.0 (0.1) (0.5) (1.2) Discounting o<span class=\"_ _2\"></span>f provisions<span class=\"_ _e\"></span> (0.2) 0.0 1.1 0.0 0.0 0.9 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 11.1 2.9 132.0 3.2 5.7 154.8 Long<span class=\"ls0\">-term portion<span class=\"_ _e\"></span> </span>9.2 2.9 132.0 0.0 2.1 146.2 Short-term portion 2.0 0.0 0.0 3.2 3.4 8.6 The group<span class=\"_ _2\"></span> has recognised provisions for the following:<span class=\"_ _e\"></span> Environmen<span class=\"_ _2\"></span>t:<span class=\"ff3f\"> The environmental provision provides for <span class=\"_ _e\"></span>existing expo<span class=\"_ _2\"></span>sure with respect to <span class=\"ff42\">l<span class=\"_ _e\"></span>and decontamination. The \u20ac11.1</span> million </span>provision mainly r<span class=\"_ _2\"></span>elates to the B<span class=\"ff42\">elgian segment, with only a \u20ac1.9</span> <span class=\"_ _e\"></span>million provision relating to the German segment. There were no significant movements in t<span class=\"_ _2\"></span>he environmental provisions in <span class=\"_ _e\"></span>2022.  More specifically for the<span class=\"_ _2\"></span> Belgian segment, Elia has conducted soil surveys on over 200 sites in Flanders in accordance with c<span class=\"_ _e\"></span><span class=\"ls5b\">on</span>tractual agreements and Flemish<span class=\"_ _2\"></span> legislation. Significant soil contamination was found on a number of sites, with this being mainly attri<span class=\"_ _e\"></span>butable to historical p<span class=\"_ _2\"></span>ollution arising from earlier or nearby industrial activities (gas plants, incinerators, chemicals, <span class=\"_ _e\"></span>etc.). In the <span class=\"_ _e\"></span>Brussels-Capital and Walloon<span class=\"_ _2\"></span> Regions, Elia also carried out analyses and <span class=\"_ _e\"></span>studies to detect contamination at a<span class=\"_ _2\"></span> number of substations and a number of plots occup<span class=\"_ _2\"></span>ied by pylons for overhead power lines. Based<span class=\"_ _e\"></span> on the analyse<span class=\"_ _2\"></span>s and studies it con<span class=\"_ _e\"></span>ducted, Elia has made <span class=\"_ _e\"></span>provisions for possible fu<span class=\"_ _2\"></span>ture soil remediation costs in line with the relevant legislation.<span class=\"_ _e\"></span> Environmental provisions are r<span class=\"_ _2\"></span>ecognised and measured based on an expert appraisal bearing in mind BATNEEC (Best Available Techniques Not <span class=\"_ _2\"></span>Entailing Excessive Costs) as well as on the circumstances known at the end of the reporting period. The timing <span class=\"_ _e\"></span>of the settlement is unclear b<span class=\"_ _2\"></span>ut for the premises where utilisations occur, the underlying provision is classified as a short<span class=\"_ _e\"></span>-term provision. Elia Re: <span class=\"ff3f\">An amount<span class=\"fc1d\"> </span><span class=\"ff42\">of \u20ac2.9</span> million is in<span class=\"_ _2\"></span>cluded at year-<span class=\"ff42\">e<span class=\"_ _e\"></span>nd for Elia Re, a captive reinsurance company. \u20ac0.</span>1 million of this is linked to </span>claims for o<span class=\"_ _2\"></span>verhead lines, whilst <span class=\"ff42\">\u20ac</span>2.8 million is linked to <span class=\"_ _e\"></span>electrical insta<span class=\"_ _2\"></span>llations. The expected<span class=\"_ _e\"></span> timing of the related cash outflow depends on the progress and duratio<span class=\"_ _2\"></span>n of the respective procedures.<span class=\"_ _e\"></span> Dismantling p<span class=\"_ _2\"></span>rovisions: <span class=\"ff42\">As part of the Group\u2019s CAPEX <span class=\"_ _e\"></span>program<span class=\"ff3f ls57\">me<span class=\"ls0\">, <span class=\"_ _2\"></span>the Group is exposed to decommissioning obligations; most of </span></span></span>which are related to offsho<span class=\"_ _2\"></span>re projects. <span class=\"_ _e\"></span>These provision<span class=\"_ _2\"></span>s t<span class=\"_ _e\"></span>ake into account the effect of discounting and the expected cost of dismantling and removing<span class=\"_ _2\"></span> the equipment from sites or from the sea. The carrying amount of the <span class=\"ff42\">pr<span class=\"_ _e\"></span>ovision as at 31 December 2022 was \u20ac132.0 </span>million. Despite a higher d<span class=\"_ _2\"></span>iscount rate, the provision incre<span class=\"_ _e\"></span>ased due to the reassessment of the co<span class=\"_ _2\"></span>sts (inflation and <span class=\"_ _e\"></span>additiona<span class=\"_ _2\"></span>l projects), especially in Germa<span class=\"_ _2\"></span>ny where the obligation went from \u20ac89.0 million to \u20ac114.2 million. <span class=\"_ _e\"></span><span class=\"ff3f\">The Group has applied a case-<span class=\"ls5b\">by</span>-case approach </span>to estima<span class=\"_ _2\"></span>te the cash outflow needed to settle the liability.<span class=\"_ _e\"></span> Elia Group u<span class=\"_ _2\"></span>ses corporate bond rates (minimum AA rating) and sets them out to match the lifetime of the provisions in order to discount the dismantling provision<span class=\"_ _2\"></span>s. In case the discount rate is below 0%, the r<span class=\"_ _e\"></span>ate is floored at 0%. The discount rates used in 2022 ranged between 3.<span class=\"ls5b\">79</span>% to 3.<span class=\"ls5b\">83</span>%, depending on the lifetime of the asset to dismantle. Should the discount rate increase by 1%, the dismantling provisions would increase b<span class=\"_ _2\"></span>y \u20ac20.4 million.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Employee ben<span class=\"_ _2\"></span>efits<span class=\"ff3f\">: See Note 6.1<span class=\"ls78\">4 </span>for more deta<span class=\"_ _2\"></span>ils of these short-term employee benefits.<span class=\"_ _e\"></span> </span>\u2018<span class=\"ff40\">Other<span class=\"ff3f\">' consists of <span class=\"_ _2\"></span>various provisions for litigation to cover likely payment where legal proceedings have been instituted against the </span></span>Group by a th<span class=\"_ _2\"></span>ird party or where the Group is involved in l<span class=\"_ _e\"></span>egal proceed<span class=\"_ _2\"></span>ings. These estimates are based on the value of claims file<span class=\"_ _e\"></span>d or on the estimated le<span class=\"_ _2\"></span>vel of risk exposure. The expected timing <span class=\"_ _e\"></span>of the related cash outflow depends on<span class=\"_ _2\"></span> the progress and <span class=\"_ _e\"></span>duration of the associated proceeding<span class=\"_ _2\"></span>s. No<span class=\"ls0\"> assets h<span class=\"_ _2\"></span>ave been recognised in connection with the r<span class=\"_ _e\"></span>ecovery of certain provisions.<span class=\"fs11 fc1e\"> </span></span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfProvisionsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__104": {
   "value": "6.15. <span class=\"_ _92\"> </span>Provision<span class=\"_ _e\"></span>s (in \u20ac million)<span class=\"ff40\"> </span>Dismantling Employee Environmen<span class=\"_ _2\"></span>t Elia Re Other Total Obligations benefits Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 11.5 5.4 116.3 1.9 5.6 140.7 Increase 0.3 1.0 2.1 (0.1) 1.9 5.2 Reversals (0.4) (2.0) (9.6) 0.0 (0.8) (12.9) Utilisation (0.1) (0.4) 0.0 (0.1) (0.7) (1.2) Discounting o<span class=\"_ _2\"></span>f provisions<span class=\"_ _e\"></span> (0.0) 0.0 1.4 0.0 0.0 1.4 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 11.2 4.1 110.1 1.7 6.1 133.2 Long<span class=\"ls0\">-term portion<span class=\"_ _e\"></span> </span>9.1 4.1 110.1 0.0 2.2 125.6 Short-term portion 2.1 0.0 0.0 1.7 3.9 7.7 Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 11.2 4.1 110.1 1.7 6.1 133.2 Increase 1.4 2.0 57.9 1.5 1.3 64.2 Reversals (1.0) (2.9) (37.1) 0.0 (1.3) (42.4) Utilisation (0.3) (0.4) 0.0 (0.1) (0.5) (1.2) Discounting o<span class=\"_ _2\"></span>f provisions<span class=\"_ _e\"></span> (0.2) 0.0 1.1 0.0 0.0 0.9 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 11.1 2.9 132.0 3.2 5.7 154.8 Long<span class=\"ls0\">-term portion<span class=\"_ _e\"></span> </span>9.2 2.9 132.0 0.0 2.1 146.2 Short-term portion 2.0 0.0 0.0 3.2 3.4 8.6 The group<span class=\"_ _2\"></span> has recognised provisions for the following:<span class=\"_ _e\"></span> Environmen<span class=\"_ _2\"></span>t:<span class=\"ff3f\"> The environmental provision provides for <span class=\"_ _e\"></span>existing expo<span class=\"_ _2\"></span>sure with respect to <span class=\"ff42\">l<span class=\"_ _e\"></span>and decontamination. The \u20ac11.1</span> million </span>provision mainly r<span class=\"_ _2\"></span>elates to the B<span class=\"ff42\">elgian segment, with only a \u20ac1.9</span> <span class=\"_ _e\"></span>million provision relating to the German segment. There were no significant movements in t<span class=\"_ _2\"></span>he environmental provisions in <span class=\"_ _e\"></span>2022.  More specifically for the<span class=\"_ _2\"></span> Belgian segment, Elia has conducted soil surveys on over 200 sites in Flanders in accordance with c<span class=\"_ _e\"></span><span class=\"ls5b\">on</span>tractual agreements and Flemish<span class=\"_ _2\"></span> legislation. Significant soil contamination was found on a number of sites, with this being mainly attri<span class=\"_ _e\"></span>butable to historical p<span class=\"_ _2\"></span>ollution arising from earlier or nearby industrial activities (gas plants, incinerators, chemicals, <span class=\"_ _e\"></span>etc.). In the <span class=\"_ _e\"></span>Brussels-Capital and Walloon<span class=\"_ _2\"></span> Regions, Elia also carried out analyses and <span class=\"_ _e\"></span>studies to detect contamination at a<span class=\"_ _2\"></span> number of substations and a number of plots occup<span class=\"_ _2\"></span>ied by pylons for overhead power lines. Based<span class=\"_ _e\"></span> on the analyse<span class=\"_ _2\"></span>s and studies it con<span class=\"_ _e\"></span>ducted, Elia has made <span class=\"_ _e\"></span>provisions for possible fu<span class=\"_ _2\"></span>ture soil remediation costs in line with the relevant legislation.<span class=\"_ _e\"></span> Environmental provisions are r<span class=\"_ _2\"></span>ecognised and measured based on an expert appraisal bearing in mind BATNEEC (Best Available Techniques Not <span class=\"_ _2\"></span>Entailing Excessive Costs) as well as on the circumstances known at the end of the reporting period. The timing <span class=\"_ _e\"></span>of the settlement is unclear b<span class=\"_ _2\"></span>ut for the premises where utilisations occur, the underlying provision is classified as a short<span class=\"_ _e\"></span>-term provision. Elia Re: <span class=\"ff3f\">An amount<span class=\"fc1d\"> </span><span class=\"ff42\">of \u20ac2.9</span> million is in<span class=\"_ _2\"></span>cluded at year-<span class=\"ff42\">e<span class=\"_ _e\"></span>nd for Elia Re, a captive reinsurance company. \u20ac0.</span>1 million of this is linked to </span>claims for o<span class=\"_ _2\"></span>verhead lines, whilst <span class=\"ff42\">\u20ac</span>2.8 million is linked to <span class=\"_ _e\"></span>electrical insta<span class=\"_ _2\"></span>llations. The expected<span class=\"_ _e\"></span> timing of the related cash outflow depends on the progress and duratio<span class=\"_ _2\"></span>n of the respective procedures.<span class=\"_ _e\"></span> Dismantling p<span class=\"_ _2\"></span>rovisions: <span class=\"ff42\">As part of the Group\u2019s CAPEX <span class=\"_ _e\"></span>program<span class=\"ff3f ls57\">me<span class=\"ls0\">, <span class=\"_ _2\"></span>the Group is exposed to decommissioning obligations; most of </span></span></span>which are related to offsho<span class=\"_ _2\"></span>re projects. <span class=\"_ _e\"></span>These provision<span class=\"_ _2\"></span>s t<span class=\"_ _e\"></span>ake into account the effect of discounting and the expected cost of dismantling and removing<span class=\"_ _2\"></span> the equipment from sites or from the sea. The carrying amount of the <span class=\"ff42\">pr<span class=\"_ _e\"></span>ovision as at 31 December 2022 was \u20ac132.0 </span>million. Despite a higher d<span class=\"_ _2\"></span>iscount rate, the provision incre<span class=\"_ _e\"></span>ased due to the reassessment of the co<span class=\"_ _2\"></span>sts (inflation and <span class=\"_ _e\"></span>additiona<span class=\"_ _2\"></span>l projects), especially in Germa<span class=\"_ _2\"></span>ny where the obligation went from \u20ac89.0 million to \u20ac114.2 million. <span class=\"_ _e\"></span><span class=\"ff3f\">The Group has applied a case-<span class=\"ls5b\">by</span>-case approach </span>to estima<span class=\"_ _2\"></span>te the cash outflow needed to settle the liability.<span class=\"_ _e\"></span> Elia Group u<span class=\"_ _2\"></span>ses corporate bond rates (minimum AA rating) and sets them out to match the lifetime of the provisions in order to discount the dismantling provision<span class=\"_ _2\"></span>s. In case the discount rate is below 0%, the r<span class=\"_ _e\"></span>ate is floored at 0%. The discount rates used in 2022 ranged between 3.<span class=\"ls5b\">79</span>% to 3.<span class=\"ls5b\">83</span>%, depending on the lifetime of the asset to dismantle. Should the discount rate increase by 1%, the dismantling provisions would increase b<span class=\"_ _2\"></span>y \u20ac20.4 million.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>Employee ben<span class=\"_ _2\"></span>efits<span class=\"ff3f\">: See Note 6.1<span class=\"ls78\">4 </span>for more deta<span class=\"_ _2\"></span>ils of these short-term employee benefits.<span class=\"_ _e\"></span> </span>\u2018<span class=\"ff40\">Other<span class=\"ff3f\">' consists of <span class=\"_ _2\"></span>various provisions for litigation to cover likely payment where legal proceedings have been instituted against the </span></span>Group by a th<span class=\"_ _2\"></span>ird party or where the Group is involved in l<span class=\"_ _e\"></span>egal proceed<span class=\"_ _2\"></span>ings. These estimates are based on the value of claims file<span class=\"_ _e\"></span>d or on the estimated le<span class=\"_ _2\"></span>vel of risk exposure. The expected timing <span class=\"_ _e\"></span>of the related cash outflow depends on<span class=\"_ _2\"></span> the progress and <span class=\"_ _e\"></span>duration of the associated proceeding<span class=\"_ _2\"></span>s. No<span class=\"ls0\"> assets h<span class=\"_ _2\"></span>ave been recognised in connection with the r<span class=\"_ _e\"></span>ecovery of certain provisions.<span class=\"fs11 fc1e\"> </span></span>Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherProvisionsContingentLiabilitiesAndContingentAssetsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__110": {
   "value": "6.16. <span class=\"_ _92\"> </span>Oth<span class=\"_ _e\"></span>er non-current liabilities (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Investment grants 213.9 147.2 Non-current deferred<span class=\"_ _2\"></span> income 147.2 140.5 Derivatives 24.7 0.0 Other 1.8 1.8 Total 387.6 289.5 Of the total investment gra<span class=\"_ _2\"></span>nts, \u20ac137.8<span class=\"ff3f\"> million relates to 50<span class=\"_ _e\"></span>Hertz Transmission (Germany) </span>and \u20ac76,2 million to Elia Transmission (Belgium).<span class=\"_ _2\"></span> The investment grants are spread over several assets. The most significant projects a<span class=\"_ _e\"></span>re: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In Belgium<span class=\"_ _2\"></span>: the Princess Elisabeth energy island which will serve as an extension of the electricity grid in the North Sea. This </span></span>grant has been signed in <span class=\"ff42\">December 2022 for a total amount of \u20ac99,7 m<span class=\"_ _2\"></span>illion (pre<span class=\"_ _e\"></span><span class=\"ff3f\">-</span>taxes), out of which \u20ac73,1 million are reported in </span>the Other non-current liability (post taxe<span class=\"_ _2\"></span>s);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In Ge<span class=\"_ _2\"></span>rmany: SuedOstLink and Kriegers Flak Combined Grid Solution<span class=\"_ _2\"></span>.<span class=\"_ _e\"></span> </span></span>All are were<span class=\"_ _2\"></span> subsidized by the European Unio<span class=\"_ _e\"></span>n. The grants are released in profit and loss based on the usefu<span class=\"_ _2\"></span>l lives of the assets to which they relate<span class=\"_ _2\"></span>. The terms and conditions of the grants were monitored and met as per 31 December 2022.<span class=\"_ _e\"></span> Contract liabilities re<span class=\"_ _2\"></span>mained stable<span class=\"fc1d\">.</span> They mainly relate to <span class=\"_ _e\"></span>upfront payment for last mile connection<span class=\"_ _2\"></span>. At the end of 2022, a liability of \u20ac112.7<span class=\"_ _2\"></span> million was recognised within Elia Transmission (Belgium) and a liability of \u20ac34.5 m<span class=\"_ _2\"></span>illion within 50Hertz Transmission<span class=\"_ _e\"></span><span class=\"ff3f\"> (G<span class=\"_ _e\"></span>ermany) </span>with that respect<span class=\"_ _2\"></span>. The income is released over the lifetime of the asset where the last mile connection relates to. As <span class=\"_ _e\"></span>already disclosed in Note 5.1, <span class=\"ff42\">the group has recog<span class=\"_ _2\"></span>nised \u20ac8.3 million of revenue in the reporting period that was included in the contract liability balance <span class=\"_ _e\"></span><span class=\"ff3f\">a<span class=\"ls1d\">t </span></span></span>the beg<span class=\"_ _2\"></span>inning of the period (\u20ac137.3 million), including \u20ac5.1 million from non<span class=\"ff3f\">-cu<span class=\"_ _e\"></span>rrent contract liabilities. </span>The non-curre<span class=\"_ _2\"></span>nt derivatives are related to the long term <span class=\"_ _e\"></span>future contracts entered into by 50Hertz for the purpose of reducing<span class=\"_ _2\"></span> the risk of fluctuation<span class=\"_ _2\"></span>s in the expected amount of grid losses. As p<span class=\"_ _e\"></span>er 31 December 2022, these contracts have a negative fair value du<span class=\"_ _2\"></span>e to the drop in energy pr<span class=\"_ _2\"></span>ices in the last months of the year.<span class=\"_ _e\"></span> Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherNoncurrentLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__108-1": {
   "value": "6.16. <span class=\"_ _92\"> </span>Oth<span class=\"_ _e\"></span>er non-current liabilities (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Investment grants 213.9 147.2 Non-current deferred<span class=\"_ _2\"></span> income 147.2 140.5 Derivatives 24.7 0.0 Other 1.8 1.8 Total 387.6 289.5 Of the total investment gra<span class=\"_ _2\"></span>nts, \u20ac137.8<span class=\"ff3f\"> million relates to 50<span class=\"_ _e\"></span>Hertz Transmission (Germany) </span>and \u20ac76,2 million to Elia Transmission (Belgium).<span class=\"_ _2\"></span> The investment grants are spread over several assets. The most significant projects a<span class=\"_ _e\"></span>re: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In Belgium<span class=\"_ _2\"></span>: the Princess Elisabeth energy island which will serve as an extension of the electricity grid in the North Sea. This </span></span>grant has been signed in <span class=\"ff42\">December 2022 for a total amount of \u20ac99,7 m<span class=\"_ _2\"></span>illion (pre<span class=\"_ _e\"></span><span class=\"ff3f\">-</span>taxes), out of which \u20ac73,1 million are reported in </span>the Other non-current liability (post taxe<span class=\"_ _2\"></span>s);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In Ge<span class=\"_ _2\"></span>rmany: SuedOstLink and Kriegers Flak Combined Grid Solution<span class=\"_ _2\"></span>.<span class=\"_ _e\"></span> </span></span>All are were<span class=\"_ _2\"></span> subsidized by the European Unio<span class=\"_ _e\"></span>n. The grants are released in profit and loss based on the usefu<span class=\"_ _2\"></span>l lives of the assets to which they relate<span class=\"_ _2\"></span>. The terms and conditions of the grants were monitored and met as per 31 December 2022.<span class=\"_ _e\"></span> Contract liabilities re<span class=\"_ _2\"></span>mained stable<span class=\"fc1d\">.</span> They mainly relate to <span class=\"_ _e\"></span>upfront payment for last mile connection<span class=\"_ _2\"></span>. At the end of 2022, a liability of \u20ac112.7<span class=\"_ _2\"></span> million was recognised within Elia Transmission (Belgium) and a liability of \u20ac34.5 m<span class=\"_ _2\"></span>illion within 50Hertz Transmission<span class=\"_ _e\"></span><span class=\"ff3f\"> (G<span class=\"_ _e\"></span>ermany) </span>with that respect<span class=\"_ _2\"></span>. The income is released over the lifetime of the asset where the last mile connection relates to. As <span class=\"_ _e\"></span>already disclosed in Note 5.1, <span class=\"ff42\">the group has recog<span class=\"_ _2\"></span>nised \u20ac8.3 million of revenue in the reporting period that was included in the contract liability balance <span class=\"_ _e\"></span><span class=\"ff3f\">a<span class=\"ls1d\">t </span></span></span>the beg<span class=\"_ _2\"></span>inning of the period (\u20ac137.3 million), including \u20ac5.1 million from non<span class=\"ff3f\">-cu<span class=\"_ _e\"></span>rrent contract liabilities. </span>The non-curre<span class=\"_ _2\"></span>nt derivatives are related to the long term <span class=\"_ _e\"></span>future contracts entered into by 50Hertz for the purpose of reducing<span class=\"_ _2\"></span> the risk of fluctuation<span class=\"_ _2\"></span>s in the expected amount of grid losses. As p<span class=\"_ _e\"></span>er 31 December 2022, these contracts have a negative fair value du<span class=\"_ _2\"></span>e to the drop in energy pr<span class=\"_ _2\"></span>ices in the last months of the year.<span class=\"_ _e\"></span> Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.6.20. <span class=\"_ _92\"> </span>Accruals<span class=\"_ _e\"></span> and deferred income (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Accruals and<span class=\"_ _2\"></span> deferred income 91.4 11.4 Deferra<span class=\"_ _2\"></span>l account from settlement mechanism Belgian regulatory framework<span class=\"_ _e\"></span> 360.6 353.5 Deferra<span class=\"_ _2\"></span>l account from settlement mechanism German regulatory framework<span class=\"_ _e\"></span> 131.3 444.9 Total 583.3 809.8 The movements in the deferral account from the settlement mechanism are as follows: (in \u20ac million)<span class=\"ff40\"> </span>Regulatory Regulatory Total claims obligations Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 92.9 (891.3) (798.4) Increase 787.8 (786.7) 1.1 Reversals (5.9) 122.6 116.7 Utilisation 0.0 125.7 125.7 Other (e.g. discoun<span class=\"_ _2\"></span>ting)<span class=\"_ _e\"></span> 0.6 62.4 63.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 875.3 (1,367.2) (491.9) In the <span class=\"ff40\">Elia<span class=\"_ _2\"></span> Transmission segment<span class=\"ff3f\">, the deferral account from the <span class=\"ff42\">settlement mechanism (\u20ac3</span><span class=\"ls5b\">60<span class=\"_ _e\"></span></span>.6 million) decreased compared with </span></span>year end 2021 <span class=\"ff42 ls8f\">(\u20ac</span><span class=\"ls5b\">353</span>.5 million). The decrease in the defer<span class=\"_ _e\"></span>ral account fr<span class=\"_ _2\"></span>om the settle<span class=\"_ _e\"></span>ment mechanism encompasses the settlement of net surpluses from the pr<span class=\"_ _2\"></span>ior tariff period (-<span class=\"ff42\">\u20ac1<span class=\"_ _e\"></span>25.7 million), the review of the regulator on previou<span class=\"_ _2\"></span>s year\u2019<span class=\"ff3f\">s </span>s<span class=\"_ _e\"></span>ettlement mechanism (+\u20ac<span class=\"ff3f\">6.2 </span></span>million) and the operating surplu<span class=\"_ _2\"></span>s generated in the curren<span class=\"_ _e\"></span>t year over the budget approved by the re<span class=\"ff42\">gulator (+\u20ac130.8 million)</span>. Any opera<span class=\"_ _2\"></span>ting surplus/deficit, in relation to the budget of the costs and revenues authorised by the regulator, needs to be returned to<span class=\"ls0\">/refunded by the consumers and therefore does not form part of the revenues.  </span>In 2022, there w<span class=\"ff42\">as an operational surplus (<span class=\"_ _2\"></span>\u20ac 130.8<span class=\"ff3f\"> million<span class=\"_ _e\"></span>), reported as an additional regulatory obligation. This operating excess is </span></span>primar<span class=\"_ _2\"></span>ily a result of higher <span class=\"ff42\">tariff sales (\u20ac247.0 million) and non</span>-<span class=\"ff42\">co<span class=\"_ _e\"></span>ntrollable revenue (\u20ac396.7 million) driven b<span class=\"_ _2\"></span>y the cr<span class=\"_ _e\"></span>oss<span class=\"_ _e\"></span><span class=\"ff3f\">-border revenue </span></span>partly off<span class=\"_ _2\"></span>set by increased non controllable costs. <span class=\"_ _e\"></span> In the <span class=\"ff40\">50Hertz Transmission segment</span>, the deferral accounts from the <span class=\"ff42\">settlement mechanism (\u20ac</span><span class=\"ls5b\">131</span>.3 million) is th<span class=\"_ _e\"></span>e nominal amount of \u20ac<span class=\"ff3f ls5b\">209<span class=\"ls0\">.3 </span></span>million (\u20ac4<span class=\"ff3f ls5b\">47<span class=\"ls0\">.1 </span></span>million as of 31 December 2021) le<span class=\"_ _e\"></span>ss an interest e<span class=\"_ _2\"></span>ffect of \u20ac<span class=\"_ _e\"></span><span class=\"ff3f ls5b\">78<span class=\"ls0\">.0 million </span></span>(\u20ac2.2 million in 2021)<span class=\"ff3f\">.<span class=\"_ _e\"></span> The net position </span>decrea<span class=\"_ _2\"></span>sed compared to year end 2022 <span class=\"_ _e\"></span><span class=\"ff42 ls8f\">(\u20ac</span>444.9 million).  The release<span class=\"_ _2\"></span> of the deferral account is determined in the tariff setting process. The a<span class=\"_ _e\"></span>mounts on the deferral account are recognised on a yearly ba<span class=\"_ _2\"></span>sis and the release depends on the source of the deferral, some are released in T+1, whilst <span class=\"_ _e\"></span>others are released in T+2 and some are re<span class=\"_ _2\"></span>leased after a longer period<span class=\"_ _e\"></span> of time. The future<span class=\"_ _2\"></span> release of the deferral account fr<span class=\"_ _e\"></span>om the settlement mecha<span class=\"_ _2\"></span>nism to the future tariffs is set out in the table below (situ<span class=\"_ _e\"></span>ation on 31 December 2022): (in \u20ac million)<span class=\"ff40\"> </span>Belgian regu<span class=\"_ _2\"></span>latory German regulatory framework framework To be<span class=\"_ _2\"></span> refunded to the tariffs in the current regulatory peri<span class=\"_ _e\"></span>od 156.7  102.6  To be<span class=\"_ _2\"></span> refunded to the tariffs in the next regulatory period (or after)<span class=\"_ _e\"></span> 200.8  28.6  Other regula<span class=\"_ _2\"></span>tory transfer<span class=\"_ _e\"></span> 3.1  0.0  Total regu<span class=\"_ _2\"></span>latory deferr<span class=\"_ _e\"></span>al account 360.6 131.3 *Belgium: from 2020 to 2023 ;  Germany: from 2019 to 2023 The o<span class=\"_ _2\"></span>ther regulatory transfer relates to a revenue from incentive regulation which is subject to uncertainty in the particula<span class=\"_ _e\"></span>r context of a significant increase of energy <span class=\"_ _2\"></span>prices and for which the calculation method <span class=\"_ _e\"></span>should be further assessed with the Belgian regulator<span class=\"fs11 fc21\">.<span class=\"_ _e\"></span> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__107": {
   "value": "6.16. <span class=\"_ _92\"> </span>Oth<span class=\"_ _e\"></span>er non-current liabilities (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Investment grants 213.9 147.2 Non-current deferred<span class=\"_ _2\"></span> income 147.2 140.5 Derivatives 24.7 0.0 Other 1.8 1.8 Total 387.6 289.5 Of the total investment gra<span class=\"_ _2\"></span>nts, \u20ac137.8<span class=\"ff3f\"> million relates to 50<span class=\"_ _e\"></span>Hertz Transmission (Germany) </span>and \u20ac76,2 million to Elia Transmission (Belgium).<span class=\"_ _2\"></span> The investment grants are spread over several assets. The most significant projects a<span class=\"_ _e\"></span>re: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In Belgium<span class=\"_ _2\"></span>: the Princess Elisabeth energy island which will serve as an extension of the electricity grid in the North Sea. This </span></span>grant has been signed in <span class=\"ff42\">December 2022 for a total amount of \u20ac99,7 m<span class=\"_ _2\"></span>illion (pre<span class=\"_ _e\"></span><span class=\"ff3f\">-</span>taxes), out of which \u20ac73,1 million are reported in </span>the Other non-current liability (post taxe<span class=\"_ _2\"></span>s);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In Ge<span class=\"_ _2\"></span>rmany: SuedOstLink and Kriegers Flak Combined Grid Solution<span class=\"_ _2\"></span>.<span class=\"_ _e\"></span> </span></span>All are were<span class=\"_ _2\"></span> subsidized by the European Unio<span class=\"_ _e\"></span>n. The grants are released in profit and loss based on the usefu<span class=\"_ _2\"></span>l lives of the assets to which they relate<span class=\"_ _2\"></span>. The terms and conditions of the grants were monitored and met as per 31 December 2022.<span class=\"_ _e\"></span> Contract liabilities re<span class=\"_ _2\"></span>mained stable<span class=\"fc1d\">.</span> They mainly relate to <span class=\"_ _e\"></span>upfront payment for last mile connection<span class=\"_ _2\"></span>. At the end of 2022, a liability of \u20ac112.7<span class=\"_ _2\"></span> million was recognised within Elia Transmission (Belgium) and a liability of \u20ac34.5 m<span class=\"_ _2\"></span>illion within 50Hertz Transmission<span class=\"_ _e\"></span><span class=\"ff3f\"> (G<span class=\"_ _e\"></span>ermany) </span>with that respect<span class=\"_ _2\"></span>. The income is released over the lifetime of the asset where the last mile connection relates to. As <span class=\"_ _e\"></span>already disclosed in Note 5.1, <span class=\"ff42\">the group has recog<span class=\"_ _2\"></span>nised \u20ac8.3 million of revenue in the reporting period that was included in the contract liability balance <span class=\"_ _e\"></span><span class=\"ff3f\">a<span class=\"ls1d\">t </span></span></span>the beg<span class=\"_ _2\"></span>inning of the period (\u20ac137.3 million), including \u20ac5.1 million from non<span class=\"ff3f\">-cu<span class=\"_ _e\"></span>rrent contract liabilities. </span>The non-curre<span class=\"_ _2\"></span>nt derivatives are related to the long term <span class=\"_ _e\"></span>future contracts entered into by 50Hertz for the purpose of reducing<span class=\"_ _2\"></span> the risk of fluctuation<span class=\"_ _2\"></span>s in the expected amount of grid losses. As p<span class=\"_ _e\"></span>er 31 December 2022, these contracts have a negative fair value du<span class=\"_ _2\"></span>e to the drop in energy pr<span class=\"_ _2\"></span>ices in the last months of the year.<span class=\"_ _e\"></span> Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGovernmentGrantsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__112": {
   "value": "6.17. <span class=\"_ _92\"> </span>Trade<span class=\"_ _e\"></span> and other payables (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Trade deb<span class=\"_ _2\"></span>ts 1,279.0 905.3 VAT and other t<span class=\"_ _2\"></span>axes<span class=\"_ _e\"></span> 29.2 21.1 Remuneration<span class=\"_ _2\"></span> and social security 46.6 40.9 Dividends pa<span class=\"_ _2\"></span>yable<span class=\"_ _e\"></span> 1.2 1.2 Levies 3,125.7 2,177.6 Other 244.7 536.0 Accrued liabilities 77.7 14.2 Total 4,804.2 3,696.4 The trade debts in<span class=\"_ _2\"></span>creased by \u20ac1,107.8 million in a context of increased activity levels and high volatility in energy prices <span class=\"_ _e\"></span><span class=\"ff3f\">in 2022. The </span>significant variation<span class=\"_ _2\"></span> is mostly explained by the levies (+\u20ac948,1 million).<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>The <span class=\"ff42\">amoun<span class=\"_ _2\"></span>t for levies can be split into levies related to 50<span class=\"_ _e\"></span>Hertz Transm<span class=\"_ _2\"></span>ission (\u20ac2,<span class=\"_ _e\"></span><span class=\"ff3f ls5b\">959<span class=\"ls0\">.<span class=\"_ _e\"></span>8 million) and levies related to Elia Tran<span class=\"_ _2\"></span>smission </span></span></span>(\u20ac<span class=\"ff3f ls5b\">165<span class=\"ls0\">.9 million). <span class=\"_ _e\"></span> </span></span>The levie<span class=\"_ _2\"></span>s for Elia Transmission <span class=\"ls1c\">in</span>creased compared with<span class=\"_ _e\"></span> the <span class=\"ff42\">previous year (\u20ac</span>+141.3 million). The levies include federal levies, which totalled \u20ac<span class=\"ff3f ls5b\">150<span class=\"ls0\">.0 million on 31 December 2022 </span></span><span class=\"ls57\">(\u20ac</span><span class=\"ff3f\">6.2<span class=\"_ _2\"></span> million<span class=\"_ _e\"></span> in 2021<span class=\"ff42\">). Levies for the Walloon government decrea<span class=\"_ _2\"></span>sed to \u20ac1<span class=\"ff3f\">3.8<span class=\"_ _e\"></span> million, </span></span></span>(\u20ac<span class=\"ff3f ls5b\">17<span class=\"ls0\">.0 million in 2021<span class=\"ff42\">). The remaining balance mainly consists of strategic reserves (\u20ac</span>0<span class=\"_ _e\"></span>.7 million). The significant increase in federal </span></span>leview is explained by a<span class=\"_ _2\"></span> new system implemented in 2022 <span class=\"_ _e\"></span>which allows the group to be pre-funded for its green certificate buybacks in a 2022 context where wind pr<span class=\"_ _2\"></span>oduction has been significantly lower than expected.<span class=\"_ _e\"></span> The levie<span class=\"_ _2\"></span>s for 50Hertz Transmission <span class=\"ls1c\">in</span>creased compared<span class=\"_ _e\"></span> to previous yea<span class=\"ff42\">r (\u20ac2153.0 million) due to the significant in</span>crease of the EEG balance. The<span class=\"_ _2\"></span> 2022 levies mainly include <span class=\"ff42\">EEG (<span class=\"_ _e\"></span>\u20ac2,934.4 million) and \u00a719StromNEV (\u20ac</span>25.3 million). The o<span class=\"_ _2\"></span>ther payables mainly related to margin calls on derivatives hedging grid losses of the German segment (\u20ac235.0 million as<span class=\"_ _e\"></span><span class=\"ff3f\"> of 31 </span>December 2022 compared to \u20ac356<span class=\"_ _2\"></span>.0 million last year) and other regulatory liabilities.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTradeAndOtherPayablesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__114-1": {
   "value": "The o<span class=\"_ _2\"></span>ther payables mainly related to margin calls on derivatives hedging grid losses of the German segment (\u20ac235.0 million as<span class=\"_ _e\"></span><span class=\"ff3f\"> of 31 </span>December 2022 compared to \u20ac356<span class=\"_ _2\"></span>.0 million last year) and other regulatory liabilities.6.16. <span class=\"_ _92\"> </span>Oth<span class=\"_ _e\"></span>er non-current liabilities (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Investment grants 213.9 147.2 Non-current deferred<span class=\"_ _2\"></span> income 147.2 140.5 Derivatives 24.7 0.0 Other 1.8 1.8 Total 387.6 289.5 Of the total investment gra<span class=\"_ _2\"></span>nts, \u20ac137.8<span class=\"ff3f\"> million relates to 50<span class=\"_ _e\"></span>Hertz Transmission (Germany) </span>and \u20ac76,2 million to Elia Transmission (Belgium).<span class=\"_ _2\"></span> The investment grants are spread over several assets. The most significant projects a<span class=\"_ _e\"></span>re: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In Belgium<span class=\"_ _2\"></span>: the Princess Elisabeth energy island which will serve as an extension of the electricity grid in the North Sea. This </span></span>grant has been signed in <span class=\"ff42\">December 2022 for a total amount of \u20ac99,7 m<span class=\"_ _2\"></span>illion (pre<span class=\"_ _e\"></span><span class=\"ff3f\">-</span>taxes), out of which \u20ac73,1 million are reported in </span>the Other non-current liability (post taxe<span class=\"_ _2\"></span>s);<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">In Ge<span class=\"_ _2\"></span>rmany: SuedOstLink and Kriegers Flak Combined Grid Solution<span class=\"_ _2\"></span>.<span class=\"_ _e\"></span> </span></span>All are were<span class=\"_ _2\"></span> subsidized by the European Unio<span class=\"_ _e\"></span>n. The grants are released in profit and loss based on the usefu<span class=\"_ _2\"></span>l lives of the assets to which they relate<span class=\"_ _2\"></span>. The terms and conditions of the grants were monitored and met as per 31 December 2022.<span class=\"_ _e\"></span> Contract liabilities re<span class=\"_ _2\"></span>mained stable<span class=\"fc1d\">.</span> They mainly relate to <span class=\"_ _e\"></span>upfront payment for last mile connection<span class=\"_ _2\"></span>. At the end of 2022, a liability of \u20ac112.7<span class=\"_ _2\"></span> million was recognised within Elia Transmission (Belgium) and a liability of \u20ac34.5 m<span class=\"_ _2\"></span>illion within 50Hertz Transmission<span class=\"_ _e\"></span><span class=\"ff3f\"> (G<span class=\"_ _e\"></span>ermany) </span>with that respect<span class=\"_ _2\"></span>. The income is released over the lifetime of the asset where the last mile connection relates to. As <span class=\"_ _e\"></span>already disclosed in Note 5.1, <span class=\"ff42\">the group has recog<span class=\"_ _2\"></span>nised \u20ac8.3 million of revenue in the reporting period that was included in the contract liability balance <span class=\"_ _e\"></span><span class=\"ff3f\">a<span class=\"ls1d\">t </span></span></span>the beg<span class=\"_ _2\"></span>inning of the period (\u20ac137.3 million), including \u20ac5.1 million from non<span class=\"ff3f\">-cu<span class=\"_ _e\"></span>rrent contract liabilities. </span>The non-curre<span class=\"_ _2\"></span>nt derivatives are related to the long term <span class=\"_ _e\"></span>future contracts entered into by 50Hertz for the purpose of reducing<span class=\"_ _2\"></span> the risk of fluctuation<span class=\"_ _2\"></span>s in the expected amount of grid losses. As p<span class=\"_ _e\"></span>er 31 December 2022, these contracts have a negative fair value du<span class=\"_ _2\"></span>e to the drop in energy pr<span class=\"_ _2\"></span>ices in the last months of the year.<span class=\"_ _e\"></span> Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDerivativeFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__119": {
   "value": "6.18. <span class=\"_ _92\"> </span>Fin<span class=\"_ _e\"></span>ancial instruments <span class=\"ff43\">\u2013</span> fair values The fo<span class=\"_ _2\"></span>llowing table shows the carrying amounts and fair values of financial assets and liabilities, including their levels in<span class=\"_ _e\"></span> the fair value hierar<span class=\"_ _2\"></span>chy<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> Carrying amount Fair value (in \u20ac million)<span class=\"ff40\"> </span>Balance at 31 December<span class=\"_ _2\"></span> 2021<span class=\"ls0\"> </span>Other financial assets 7.0  399.4  46.2  452.5  362.6  43.8  406.4  Equity instruments at fair value through other comprehensive income 43.8  43.8  43.8  43.8  Equity instruments at fair value through income 7.0  7.0  7.0  7.0  Derivatives 355.6  355.6  355.6  355.6  Regulatory assets 46.2  46.2  Trade and other receivables  (Current and Non-current) 861.8  861.8  Cash and cash equivalents 3,049.5  3,049.5  Loans and borrowings (Current and Non-Current) 0.0  0.0  0.0  (7,935.7) (7,935.7) (7,968.8) (247.8) (8,216.6) Unsecured bond issues (7,248.5) (7,248.5) (7,476.8) (247.8) (7,724.6) Unsecured financial bank loans and other loans (492.0) (492.0) (492.0) (492.0) Lease liabilities (118.8) (118.8) Accrued interests (76.4) (76.4) Trade and other payables (3,696.4) (3,696.4) Total 7.0 399.4 3,957.5 (11,632.0) (7,268.2) n.r. n.r. n.r. n.r. Balance at 31 December<span class=\"_ _2\"></span> 2022<span class=\"ls0\"> </span>Other financial assets 7.0  296.1  33.8  336.9  226.6  76.4  303.1  Equity instru<span class=\"_ _e\"></span>ments at fa<span class=\"_ _2\"></span>ir value through other comprehensive income 76.4  76.4  76.4  76.4  Equity instruments at fair value through income 7.0  7.0  7.0  7.0  Derivatives 219.7  219.7  219.7  219.7  Regulatory assets 33.8  33.8  Trade and other receivables (Current and Non-current) 1,367.1  1,367.1  Cash and cash equivalents 4,151.2  4,151.2  Loans and borrowings (Current and Non-Current) 0.0  0.0  0.0  (8,582.8) (8,582.8) (8,183.4) (172.9) (8,356.3) Unsecured bond issues (7,243.0) (7,243.0) (7,015.7) (172.9) (7,188.6) Unsecured financial bank loans and other loans (1,167.7) (1,167.7) (1,167.7) (1,167.7) Lease liabilities (90.2) (90.2) Accrued interests (81.9) (81.9) Other non-current liabilities  (24.7) (24.7) out of which, <span class=\"ff48\">Derivatives</span> (24.7) (24.7) (24.7) (24.7) Trade and other payables (4,804.2) (4,804.2) Total 7.0 2<span class=\"ls104\">71<span class=\"_ _e\"></span></span>.4 5,552.1 (13,387.0) (7,556.5) n.r. n.r. n.r. n.r. The above t<span class=\"_ _2\"></span>ables do not include fair value information for financial assets and liabilities not measured at fair value, such as cash and cash equ<span class=\"_ _2\"></span>ivalents, trade and other receivables, and trade and other payables, as their carrying amount is a reasona<span class=\"_ _e\"></span>ble approximation of fair value<span class=\"_ _2\"></span>. We consider that the carrying amount approxi<span class=\"_ _e\"></span>mates the fair value considering the financial and short-te<span class=\"_ _e\"></span>rm nature. FAIR VALUE HI<span class=\"_ _e\"></span>ERARCHY<span class=\"ff3f\"> </span>Fair va<span class=\"_ _2\"></span>lue is the amount for which an asset could be exchanged or a liability settled in an arm's-le<span class=\"_ _e\"></span>ngth transaction. IFRS 7 requires,<span class=\"_ _2\"></span> for financial instrume<span class=\"_ _2\"></span>nts that are measured in the s<span class=\"_ _e\"></span>tatement of financial position at fair value and for financial instruments measured at amortised cost for which<span class=\"_ _2\"></span> the fair value has been disclosed<span class=\"_ _e\"></span>, the disclosure of fair value measurements by level in the following fair value measurement hierarch<span class=\"_ _2\"></span>y: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 1: <span class=\"ff3f\">The fair value of a financial instrument that is traded in an active <span class=\"_ _e\"></span>market is measured based on quoted (unadjusted) </span></span></span>prices for iden<span class=\"_ _2\"></span>tical assets or liabilities. A market is considered active if quoted prices are readily and regularly availabl<span class=\"_ _e\"></span>e from an exchange, dea<span class=\"_ _2\"></span>ler, broker, industry group, pricing service or regulatory agency, and those prices represent actual a<span class=\"_ _e\"></span>nd regularly occurring market transa<span class=\"_ _2\"></span>ctions on an arm\u2019s<span class=\"ff3f\">-length basis.<span class=\"_ _e\"></span> </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 2: <span class=\"ff3f\">The fair value of financial instruments that are not traded in an active market is determined usin<span class=\"_ _e\"></span>g valuation techniques. </span></span></span>These maximise the use of observable market data where these are available and rely as little as possible on entity-specific estimates.<span class=\"_ _2\"></span> If all significant inputs required to assess the fair value of an instrument are observable, either directly (i.e.<span class=\"_ _e\"></span> as prices) or indirectly (<span class=\"_ _2\"></span>i.e. derived from prices), the instrument is included in level 2.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 3: <span class=\"ff3f\">If one or more of the significant inputs used in applying the valuation technique is not based on observable market data, </span></span></span>the finan<span class=\"_ _2\"></span>cial instrument is included in level 3. T<span class=\"ff42\">h<span class=\"_ _e\"></span>e fair value amount included under \u2018Other financial assets\u2019 ha<span class=\"_ _2\"></span>s been determined </span>by referring<span class=\"_ _2\"></span> to either: (i) recent transaction prices, known <span class=\"_ _e\"></span>by the group; for similar financial assets or (ii) valuation reports issued by third partie<span class=\"_ _2\"></span>s. The fa<span class=\"_ _2\"></span>ir value of financial assets and liabilities, other than those presented in the above table, approximates to their carrying amounts largely due to the sh<span class=\"_ _2\"></span>ort-term maturities of these instrume<span class=\"_ _e\"></span>nts. The fa<span class=\"_ _2\"></span>ir value of other financial assets decreased by \u20ac115.6 million compar<span class=\"_ _e\"></span><span class=\"ff3f\">ed to previous year. The decrease mainly results from the </span>fair value<span class=\"_ _2\"></span> of the future contracts entered into by 50Hertz for the purpose of reducing the risk of fluctuations in the expected amount of grid losses <span class=\"ff42\">(\u20ac154,4 m<span class=\"_ _2\"></span>illion end of 2022 compared to \u20ac355.6 m<span class=\"ff3f\">illion last year). This decrease is partly offset by the positive value </span></span>accounted for<span class=\"_ _2\"></span> in Belgium in connection with the pre-<span class=\"_ _e\"></span>hedging of probable forecast debt transa<span class=\"_ _2\"></span>ctions (bonds issuance). The fair value of these derivatives amounted<span class=\"_ _2\"></span> to \u20ac65.3 million. <span class=\"ff3f\">The </span>fair v<span class=\"_ _e\"></span>alue of the Sicav and the group\u2019s stake in EEX increased following rea<span class=\"_ _2\"></span>ssessment of the fair valu<span class=\"_ _2\"></span>e of EEX. Despite a lo<span class=\"_ _2\"></span>wer pricing on the market, the fair value of the bank loans and bond issues increased by \u20ac139.7 million, due to t<span class=\"_ _e\"></span><span class=\"ff3f\">he higher </span>nominal va<span class=\"_ _2\"></span>lue (additional Green Bond in Germany).<span class=\"_ _e\"></span> The fa<span class=\"_ _2\"></span>ir value of sicavs falls into level 1, i.e. valuation is b<span class=\"_ _e\"></span>ased on<span class=\"_ _2\"></span> the listed market price on an active market for identical instruments.<span class=\"_ _20\"></span> The derivative<span class=\"_ _2\"></span> from the price hedge for grid loss procu<span class=\"_ _e\"></span>rement, which is measured at fair value in OCI without affe<span class=\"_ _2\"></span>cting profit or loss, falls under<span class=\"_ _2\"></span> level 1 of the measurement hierarchy. Its value is determined on the basis of the reporting date valuation of the exist<span class=\"_ _e\"></span>ing futures contract<span class=\"_ _2\"></span>s, which are fully contracted via the EEX electricit<span class=\"_ _e\"></span>y exchange and quo<span class=\"_ _2\"></span>ted there. Credit and default risks are avoided with this form o<span class=\"_ _2\"></span>f price hedging via exchange transactions. A<span class=\"_ _e\"></span>t December 31, 2022, the Group reported derivative financia<span class=\"_ _2\"></span>l ins<span class=\"_ _e\"></span>truments in a net amoun<span class=\"_ _2\"></span>t of \u20ac129.6 million. The futures contracts were concluded during the fiscal year at prices between \u20ac61 and \u20ac295 per MWh. As a result of the vo<span class=\"_ _2\"></span>latile price development on the electricity market, a differentiated picture emerged on the balance sheet dat<span class=\"_ _e\"></span>e: Futures for 2023 were still con<span class=\"_ _2\"></span>tracted at advantageous hedging prices and show a positive market value (\u20ac 154.3 million) on the balance s<span class=\"_ _e\"></span><span class=\"ff3f\">heet </span>date, while<span class=\"_ _2\"></span> the futures positions already contracted for 2024 show a negative market value (\u20ac <span class=\"_ _e\"></span><span class=\"ff3f\">-24.7 million) as a result of the price </span>decline shortly be<span class=\"_ _2\"></span>fore the end of 2022. At the balance sheet date, the Group had already hedged a volume of 2.9 TWh for its ex<span class=\"_ _e\"></span>pected physical requirements for grid loss <span class=\"_ _2\"></span>energy in subsequent <span class=\"_ _e\"></span>years. The fa<span class=\"_ _2\"></span>ir value of the bonds is \u20ac7.<span class=\"ff3f ls5b\">036<span class=\"_ _e\"></span><span class=\"ls0\">.5 million (pr</span></span>ior year: <span class=\"_ _e\"></span>\u20ac7.<span class=\"ff3f ls5b\">724<span class=\"ls0\">,6 million). Fair value was determined by reference to published price </span></span>quotations in an active marke<span class=\"_ _2\"></span>t (classified as level 1 in the <span class=\"_ _e\"></span>fair value<span class=\"_ _2\"></span> hierarchy). The fair value of the registered bond is <span class=\"_ _e\"></span><span class=\"ff42\">\u20ac37.2 million</span> <span class=\"ls5b\">as</span> of 31 December 2022 and was determined by reference to third party information, <span class=\"_ _2\"></span>such as pricing services (classified as level 3 in the fair value<span class=\"_ _2\"></span> hierarchy). The fair value of the private placement amounts to <span class=\"ff42\">\u20ac</span>1<span class=\"ls5b\">33<span class=\"_ _e\"></span></span>.2 million (classified as level 3 in the fair value hierarchy).<span class=\"_ _e\"></span> The fa<span class=\"_ _2\"></span>ir value of other bank loans approximates to their carrying amounts largely due to the short-t<span class=\"_ _e\"></span>erm maturities of these instruments. Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialInstrumentsAtFairValueThroughProfitOrLossExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__118": {
   "value": "6.18. <span class=\"_ _92\"> </span>Fin<span class=\"_ _e\"></span>ancial instruments <span class=\"ff43\">\u2013</span> fair values The fo<span class=\"_ _2\"></span>llowing table shows the carrying amounts and fair values of financial assets and liabilities, including their levels in<span class=\"_ _e\"></span> the fair value hierar<span class=\"_ _2\"></span>chy<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> Carrying amount Fair value (in \u20ac million)<span class=\"ff40\"> </span>Balance at 31 December<span class=\"_ _2\"></span> 2021<span class=\"ls0\"> </span>Other financial assets 7.0  399.4  46.2  452.5  362.6  43.8  406.4  Equity instruments at fair value through other comprehensive income 43.8  43.8  43.8  43.8  Equity instruments at fair value through income 7.0  7.0  7.0  7.0  Derivatives 355.6  355.6  355.6  355.6  Regulatory assets 46.2  46.2  Trade and other receivables  (Current and Non-current) 861.8  861.8  Cash and cash equivalents 3,049.5  3,049.5  Loans and borrowings (Current and Non-Current) 0.0  0.0  0.0  (7,935.7) (7,935.7) (7,968.8) (247.8) (8,216.6) Unsecured bond issues (7,248.5) (7,248.5) (7,476.8) (247.8) (7,724.6) Unsecured financial bank loans and other loans (492.0) (492.0) (492.0) (492.0) Lease liabilities (118.8) (118.8) Accrued interests (76.4) (76.4) Trade and other payables (3,696.4) (3,696.4) Total 7.0 399.4 3,957.5 (11,632.0) (7,268.2) n.r. n.r. n.r. n.r. Balance at 31 December<span class=\"_ _2\"></span> 2022<span class=\"ls0\"> </span>Other financial assets 7.0  296.1  33.8  336.9  226.6  76.4  303.1  Equity instru<span class=\"_ _e\"></span>ments at fa<span class=\"_ _2\"></span>ir value through other comprehensive income 76.4  76.4  76.4  76.4  Equity instruments at fair value through income 7.0  7.0  7.0  7.0  Derivatives 219.7  219.7  219.7  219.7  Regulatory assets 33.8  33.8  Trade and other receivables (Current and Non-current) 1,367.1  1,367.1  Cash and cash equivalents 4,151.2  4,151.2  Loans and borrowings (Current and Non-Current) 0.0  0.0  0.0  (8,582.8) (8,582.8) (8,183.4) (172.9) (8,356.3) Unsecured bond issues (7,243.0) (7,243.0) (7,015.7) (172.9) (7,188.6) Unsecured financial bank loans and other loans (1,167.7) (1,167.7) (1,167.7) (1,167.7) Lease liabilities (90.2) (90.2) Accrued interests (81.9) (81.9) Other non-current liabilities  (24.7) (24.7) out of which, <span class=\"ff48\">Derivatives</span> (24.7) (24.7) (24.7) (24.7) Trade and other payables (4,804.2) (4,804.2) Total 7.0 2<span class=\"ls104\">71<span class=\"_ _e\"></span></span>.4 5,552.1 (13,387.0) (7,556.5) n.r. n.r. n.r. n.r. The above t<span class=\"_ _2\"></span>ables do not include fair value information for financial assets and liabilities not measured at fair value, such as cash and cash equ<span class=\"_ _2\"></span>ivalents, trade and other receivables, and trade and other payables, as their carrying amount is a reasona<span class=\"_ _e\"></span>ble approximation of fair value<span class=\"_ _2\"></span>. We consider that the carrying amount approxi<span class=\"_ _e\"></span>mates the fair value considering the financial and short-te<span class=\"_ _e\"></span>rm nature. FAIR VALUE HI<span class=\"_ _e\"></span>ERARCHY<span class=\"ff3f\"> </span>Fair va<span class=\"_ _2\"></span>lue is the amount for which an asset could be exchanged or a liability settled in an arm's-le<span class=\"_ _e\"></span>ngth transaction. IFRS 7 requires,<span class=\"_ _2\"></span> for financial instrume<span class=\"_ _2\"></span>nts that are measured in the s<span class=\"_ _e\"></span>tatement of financial position at fair value and for financial instruments measured at amortised cost for which<span class=\"_ _2\"></span> the fair value has been disclosed<span class=\"_ _e\"></span>, the disclosure of fair value measurements by level in the following fair value measurement hierarch<span class=\"_ _2\"></span>y: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 1: <span class=\"ff3f\">The fair value of a financial instrument that is traded in an active <span class=\"_ _e\"></span>market is measured based on quoted (unadjusted) </span></span></span>prices for iden<span class=\"_ _2\"></span>tical assets or liabilities. A market is considered active if quoted prices are readily and regularly availabl<span class=\"_ _e\"></span>e from an exchange, dea<span class=\"_ _2\"></span>ler, broker, industry group, pricing service or regulatory agency, and those prices represent actual a<span class=\"_ _e\"></span>nd regularly occurring market transa<span class=\"_ _2\"></span>ctions on an arm\u2019s<span class=\"ff3f\">-length basis.<span class=\"_ _e\"></span> </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 2: <span class=\"ff3f\">The fair value of financial instruments that are not traded in an active market is determined usin<span class=\"_ _e\"></span>g valuation techniques. </span></span></span>These maximise the use of observable market data where these are available and rely as little as possible on entity-specific estimates.<span class=\"_ _2\"></span> If all significant inputs required to assess the fair value of an instrument are observable, either directly (i.e.<span class=\"_ _e\"></span> as prices) or indirectly (<span class=\"_ _2\"></span>i.e. derived from prices), the instrument is included in level 2.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 3: <span class=\"ff3f\">If one or more of the significant inputs used in applying the valuation technique is not based on observable market data, </span></span></span>the finan<span class=\"_ _2\"></span>cial instrument is included in level 3. T<span class=\"ff42\">h<span class=\"_ _e\"></span>e fair value amount included under \u2018Other financial assets\u2019 ha<span class=\"_ _2\"></span>s been determined </span>by referring<span class=\"_ _2\"></span> to either: (i) recent transaction prices, known <span class=\"_ _e\"></span>by the group; for similar financial assets or (ii) valuation reports issued by third partie<span class=\"_ _2\"></span>s. The fa<span class=\"_ _2\"></span>ir value of financial assets and liabilities, other than those presented in the above table, approximates to their carrying amounts largely due to the sh<span class=\"_ _2\"></span>ort-term maturities of these instrume<span class=\"_ _e\"></span>nts. The fa<span class=\"_ _2\"></span>ir value of other financial assets decreased by \u20ac115.6 million compar<span class=\"_ _e\"></span><span class=\"ff3f\">ed to previous year. The decrease mainly results from the </span>fair value<span class=\"_ _2\"></span> of the future contracts entered into by 50Hertz for the purpose of reducing the risk of fluctuations in the expected amount of grid losses <span class=\"ff42\">(\u20ac154,4 m<span class=\"_ _2\"></span>illion end of 2022 compared to \u20ac355.6 m<span class=\"ff3f\">illion last year). This decrease is partly offset by the positive value </span></span>accounted for<span class=\"_ _2\"></span> in Belgium in connection with the pre-<span class=\"_ _e\"></span>hedging of probable forecast debt transa<span class=\"_ _2\"></span>ctions (bonds issuance). The fair value of these derivatives amounted<span class=\"_ _2\"></span> to \u20ac65.3 million. <span class=\"ff3f\">The </span>fair v<span class=\"_ _e\"></span>alue of the Sicav and the group\u2019s stake in EEX increased following rea<span class=\"_ _2\"></span>ssessment of the fair valu<span class=\"_ _2\"></span>e of EEX. Despite a lo<span class=\"_ _2\"></span>wer pricing on the market, the fair value of the bank loans and bond issues increased by \u20ac139.7 million, due to t<span class=\"_ _e\"></span><span class=\"ff3f\">he higher </span>nominal va<span class=\"_ _2\"></span>lue (additional Green Bond in Germany).<span class=\"_ _e\"></span> The fa<span class=\"_ _2\"></span>ir value of sicavs falls into level 1, i.e. valuation is b<span class=\"_ _e\"></span>ased on<span class=\"_ _2\"></span> the listed market price on an active market for identical instruments.<span class=\"_ _20\"></span> The derivative<span class=\"_ _2\"></span> from the price hedge for grid loss procu<span class=\"_ _e\"></span>rement, which is measured at fair value in OCI without affe<span class=\"_ _2\"></span>cting profit or loss, falls under<span class=\"_ _2\"></span> level 1 of the measurement hierarchy. Its value is determined on the basis of the reporting date valuation of the exist<span class=\"_ _e\"></span>ing futures contract<span class=\"_ _2\"></span>s, which are fully contracted via the EEX electricit<span class=\"_ _e\"></span>y exchange and quo<span class=\"_ _2\"></span>ted there. Credit and default risks are avoided with this form o<span class=\"_ _2\"></span>f price hedging via exchange transactions. A<span class=\"_ _e\"></span>t December 31, 2022, the Group reported derivative financia<span class=\"_ _2\"></span>l ins<span class=\"_ _e\"></span>truments in a net amoun<span class=\"_ _2\"></span>t of \u20ac129.6 million. The futures contracts were concluded during the fiscal year at prices between \u20ac61 and \u20ac295 per MWh. As a result of the vo<span class=\"_ _2\"></span>latile price development on the electricity market, a differentiated picture emerged on the balance sheet dat<span class=\"_ _e\"></span>e: Futures for 2023 were still con<span class=\"_ _2\"></span>tracted at advantageous hedging prices and show a positive market value (\u20ac 154.3 million) on the balance s<span class=\"_ _e\"></span><span class=\"ff3f\">heet </span>date, while<span class=\"_ _2\"></span> the futures positions already contracted for 2024 show a negative market value (\u20ac <span class=\"_ _e\"></span><span class=\"ff3f\">-24.7 million) as a result of the price </span>decline shortly be<span class=\"_ _2\"></span>fore the end of 2022. At the balance sheet date, the Group had already hedged a volume of 2.9 TWh for its ex<span class=\"_ _e\"></span>pected physical requirements for grid loss <span class=\"_ _2\"></span>energy in subsequent <span class=\"_ _e\"></span>years. The fa<span class=\"_ _2\"></span>ir value of the bonds is \u20ac7.<span class=\"ff3f ls5b\">036<span class=\"_ _e\"></span><span class=\"ls0\">.5 million (pr</span></span>ior year: <span class=\"_ _e\"></span>\u20ac7.<span class=\"ff3f ls5b\">724<span class=\"ls0\">,6 million). Fair value was determined by reference to published price </span></span>quotations in an active marke<span class=\"_ _2\"></span>t (classified as level 1 in the <span class=\"_ _e\"></span>fair value<span class=\"_ _2\"></span> hierarchy). The fair value of the registered bond is <span class=\"_ _e\"></span><span class=\"ff42\">\u20ac37.2 million</span> <span class=\"ls5b\">as</span> of 31 December 2022 and was determined by reference to third party information, <span class=\"_ _2\"></span>such as pricing services (classified as level 3 in the fair value<span class=\"_ _2\"></span> hierarchy). The fair value of the private placement amounts to <span class=\"ff42\">\u20ac</span>1<span class=\"ls5b\">33<span class=\"_ _e\"></span></span>.2 million (classified as level 3 in the fair value hierarchy).<span class=\"_ _e\"></span> The fa<span class=\"_ _2\"></span>ir value of other bank loans approximates to their carrying amounts largely due to the short-t<span class=\"_ _e\"></span>erm maturities of these instruments. Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFairValueMeasurementExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__210": {
   "value": "FAIR VALUE HI<span class=\"_ _e\"></span>ERARCHY<span class=\"ff3f\"> </span>Fair va<span class=\"_ _2\"></span>lue is the amount for which an asset could be exchanged or a liability settled in an arm's-le<span class=\"_ _e\"></span>ngth transaction. IFRS 7 requires,<span class=\"_ _2\"></span> for financial instrume<span class=\"_ _2\"></span>nts that are measured in the s<span class=\"_ _e\"></span>tatement of financial position at fair value and for financial instruments measured at amortised cost for which<span class=\"_ _2\"></span> the fair value has been disclosed<span class=\"_ _e\"></span>, the disclosure of fair value measurements by level in the following fair value measurement hierarch<span class=\"_ _2\"></span>y: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 1: <span class=\"ff3f\">The fair value of a financial instrument that is traded in an active <span class=\"_ _e\"></span>market is measured based on quoted (unadjusted) </span></span></span>prices for iden<span class=\"_ _2\"></span>tical assets or liabilities. A market is considered active if quoted prices are readily and regularly availabl<span class=\"_ _e\"></span>e from an exchange, dea<span class=\"_ _2\"></span>ler, broker, industry group, pricing service or regulatory agency, and those prices represent actual a<span class=\"_ _e\"></span>nd regularly occurring market transa<span class=\"_ _2\"></span>ctions on an arm\u2019s<span class=\"ff3f\">-length basis.<span class=\"_ _e\"></span> </span>\u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 2: <span class=\"ff3f\">The fair value of financial instruments that are not traded in an active market is determined usin<span class=\"_ _e\"></span>g valuation techniques. </span></span></span>These maximise the use of observable market data where these are available and rely as little as possible on entity-specific estimates.<span class=\"_ _2\"></span> If all significant inputs required to assess the fair value of an instrument are observable, either directly (i.e.<span class=\"_ _e\"></span> as prices) or indirectly (<span class=\"_ _2\"></span>i.e. derived from prices), the instrument is included in level 2.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">Lev<span class=\"_ _2\"></span>el 3: <span class=\"ff3f\">If one or more of the significant inputs used in applying the valuation technique is not based on observable market data, </span></span></span>the finan<span class=\"_ _2\"></span>cial instrument is included in level 3. T<span class=\"ff42\">h<span class=\"_ _e\"></span>e fair value amount included under \u2018Other financial assets\u2019 ha<span class=\"_ _2\"></span>s been determined </span>by referring<span class=\"_ _2\"></span> to either: (i) recent transaction prices, known <span class=\"_ _e\"></span>by the group; for similar financial assets or (ii) valuation reports issued by third partie<span class=\"_ _2\"></span>s. The fa<span class=\"_ _2\"></span>ir value of financial assets and liabilities, other than those presented in the above table, approximates to their carrying amounts largely due to the sh<span class=\"_ _2\"></span>ort-term maturities of these instrume<span class=\"_ _e\"></span>nts. The fa<span class=\"_ _2\"></span>ir value of other financial assets decreased by \u20ac115.6 million compar<span class=\"_ _e\"></span><span class=\"ff3f\">ed to previous year. The decrease mainly results from the </span>fair value<span class=\"_ _2\"></span> of the future contracts entered into by 50Hertz for the purpose of reducing the risk of fluctuations in the expected amount of grid losses <span class=\"ff42\">(\u20ac154,4 m<span class=\"_ _2\"></span>illion end of 2022 compared to \u20ac355.6 m<span class=\"ff3f\">illion last year). This decrease is partly offset by the positive value </span></span>accounted for<span class=\"_ _2\"></span> in Belgium in connection with the pre-<span class=\"_ _e\"></span>hedging of probable forecast debt transa<span class=\"_ _2\"></span>ctions (bonds issuance). The fair value of these derivatives amounted<span class=\"_ _2\"></span> to \u20ac65.3 million. <span class=\"ff3f\">The </span>fair v<span class=\"_ _e\"></span>alue of the Sicav and the group\u2019s stake in EEX increased following rea<span class=\"_ _2\"></span>ssessment of the fair valu<span class=\"_ _2\"></span>e of EEX. Despite a lo<span class=\"_ _2\"></span>wer pricing on the market, the fair value of the bank loans and bond issues increased by \u20ac139.7 million, due to t<span class=\"_ _e\"></span><span class=\"ff3f\">he higher </span>nominal va<span class=\"_ _2\"></span>lue (additional Green Bond in Germany).<span class=\"_ _e\"></span> The fa<span class=\"_ _2\"></span>ir value of sicavs falls into level 1, i.e. valuation is b<span class=\"_ _e\"></span>ased on<span class=\"_ _2\"></span> the listed market price on an active market for identical instruments.<span class=\"_ _20\"></span> The derivative<span class=\"_ _2\"></span> from the price hedge for grid loss procu<span class=\"_ _e\"></span>rement, which is measured at fair value in OCI without affe<span class=\"_ _2\"></span>cting profit or loss, falls under<span class=\"_ _2\"></span> level 1 of the measurement hierarchy. Its value is determined on the basis of the reporting date valuation of the exist<span class=\"_ _e\"></span>ing futures contract<span class=\"_ _2\"></span>s, which are fully contracted via the EEX electricit<span class=\"_ _e\"></span>y exchange and quo<span class=\"_ _2\"></span>ted there. Credit and default risks are avoided with this form o<span class=\"_ _2\"></span>f price hedging via exchange transactions. A<span class=\"_ _e\"></span>t December 31, 2022, the Group reported derivative financia<span class=\"_ _2\"></span>l ins<span class=\"_ _e\"></span>truments in a net amoun<span class=\"_ _2\"></span>t of \u20ac129.6 million. The futures contracts were concluded during the fiscal year at prices between \u20ac61 and \u20ac295 per MWh. As a result of the vo<span class=\"_ _2\"></span>latile price development on the electricity market, a differentiated picture emerged on the balance sheet dat<span class=\"_ _e\"></span>e: Futures for 2023 were still con<span class=\"_ _2\"></span>tracted at advantageous hedging prices and show a positive market value (\u20ac 154.3 million) on the balance s<span class=\"_ _e\"></span><span class=\"ff3f\">heet </span>date, while<span class=\"_ _2\"></span> the futures positions already contracted for 2024 show a negative market value (\u20ac <span class=\"_ _e\"></span><span class=\"ff3f\">-24.7 million) as a result of the price </span>decline shortly be<span class=\"_ _2\"></span>fore the end of 2022. At the balance sheet date, the Group had already hedged a volume of 2.9 TWh for its ex<span class=\"_ _e\"></span>pected physical requirements for grid loss <span class=\"_ _2\"></span>energy in subsequent <span class=\"_ _e\"></span>years. The fa<span class=\"_ _2\"></span>ir value of the bonds is \u20ac7.<span class=\"ff3f ls5b\">036<span class=\"_ _e\"></span><span class=\"ls0\">.5 million (pr</span></span>ior year: <span class=\"_ _e\"></span>\u20ac7.<span class=\"ff3f ls5b\">724<span class=\"ls0\">,6 million). Fair value was determined by reference to published price </span></span>quotations in an active marke<span class=\"_ _2\"></span>t (classified as level 1 in the <span class=\"_ _e\"></span>fair value<span class=\"_ _2\"></span> hierarchy). The fair value of the registered bond is <span class=\"_ _e\"></span><span class=\"ff42\">\u20ac37.2 million</span> <span class=\"ls5b\">as</span> of 31 December 2022 and was determined by reference to third party information, <span class=\"_ _2\"></span>such as pricing services (classified as level 3 in the fair value<span class=\"_ _2\"></span> hierarchy). The fair value of the private placement amounts to <span class=\"ff42\">\u20ac</span>1<span class=\"ls5b\">33<span class=\"_ _e\"></span></span>.2 million (classified as level 3 in the fair value hierarchy).<span class=\"_ _e\"></span> The fa<span class=\"_ _2\"></span>ir value of other bank loans approximates to their carrying amounts largely due to the short-t<span class=\"_ _e\"></span>erm maturities of these instruments. Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.Erreur ! Sign<span class=\"_ _2\"></span>et non d\u00e9fini.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFairValueMeasurementExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__122": {
   "value": "6.20. <span class=\"_ _92\"> </span>Accruals<span class=\"_ _e\"></span> and deferred income (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Accruals and<span class=\"_ _2\"></span> deferred income 91.4 11.4 Deferra<span class=\"_ _2\"></span>l account from settlement mechanism Belgian regulatory framework<span class=\"_ _e\"></span> 360.6 353.5 Deferra<span class=\"_ _2\"></span>l account from settlement mechanism German regulatory framework<span class=\"_ _e\"></span> 131.3 444.9 Total 583.3 809.8 The movements in the deferral account from the settlement mechanism are as follows: (in \u20ac million)<span class=\"ff40\"> </span>Regulatory Regulatory Total claims obligations Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 92.9 (891.3) (798.4) Increase 787.8 (786.7) 1.1 Reversals (5.9) 122.6 116.7 Utilisation 0.0 125.7 125.7 Other (e.g. discoun<span class=\"_ _2\"></span>ting)<span class=\"_ _e\"></span> 0.6 62.4 63.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 875.3 (1,367.2) (491.9) In the <span class=\"ff40\">Elia<span class=\"_ _2\"></span> Transmission segment<span class=\"ff3f\">, the deferral account from the <span class=\"ff42\">settlement mechanism (\u20ac3</span><span class=\"ls5b\">60<span class=\"_ _e\"></span></span>.6 million) decreased compared with </span></span>year end 2021 <span class=\"ff42 ls8f\">(\u20ac</span><span class=\"ls5b\">353</span>.5 million). The decrease in the defer<span class=\"_ _e\"></span>ral account fr<span class=\"_ _2\"></span>om the settle<span class=\"_ _e\"></span>ment mechanism encompasses the settlement of net surpluses from the pr<span class=\"_ _2\"></span>ior tariff period (-<span class=\"ff42\">\u20ac1<span class=\"_ _e\"></span>25.7 million), the review of the regulator on previou<span class=\"_ _2\"></span>s year\u2019<span class=\"ff3f\">s </span>s<span class=\"_ _e\"></span>ettlement mechanism (+\u20ac<span class=\"ff3f\">6.2 </span></span>million) and the operating surplu<span class=\"_ _2\"></span>s generated in the curren<span class=\"_ _e\"></span>t year over the budget approved by the re<span class=\"ff42\">gulator (+\u20ac130.8 million)</span>. Any opera<span class=\"_ _2\"></span>ting surplus/deficit, in relation to the budget of the costs and revenues authorised by the regulator, needs to be returned to<span class=\"ls0\">/refunded by the consumers and therefore does not form part of the revenues.  </span>In 2022, there w<span class=\"ff42\">as an operational surplus (<span class=\"_ _2\"></span>\u20ac 130.8<span class=\"ff3f\"> million<span class=\"_ _e\"></span>), reported as an additional regulatory obligation. This operating excess is </span></span>primar<span class=\"_ _2\"></span>ily a result of higher <span class=\"ff42\">tariff sales (\u20ac247.0 million) and non</span>-<span class=\"ff42\">co<span class=\"_ _e\"></span>ntrollable revenue (\u20ac396.7 million) driven b<span class=\"_ _2\"></span>y the cr<span class=\"_ _e\"></span>oss<span class=\"_ _e\"></span><span class=\"ff3f\">-border revenue </span></span>partly off<span class=\"_ _2\"></span>set by increased non controllable costs. <span class=\"_ _e\"></span> In the <span class=\"ff40\">50Hertz Transmission segment</span>, the deferral accounts from the <span class=\"ff42\">settlement mechanism (\u20ac</span><span class=\"ls5b\">131</span>.3 million) is th<span class=\"_ _e\"></span>e nominal amount of \u20ac<span class=\"ff3f ls5b\">209<span class=\"ls0\">.3 </span></span>million (\u20ac4<span class=\"ff3f ls5b\">47<span class=\"ls0\">.1 </span></span>million as of 31 December 2021) le<span class=\"_ _e\"></span>ss an interest e<span class=\"_ _2\"></span>ffect of \u20ac<span class=\"_ _e\"></span><span class=\"ff3f ls5b\">78<span class=\"ls0\">.0 million </span></span>(\u20ac2.2 million in 2021)<span class=\"ff3f\">.<span class=\"_ _e\"></span> The net position </span>decrea<span class=\"_ _2\"></span>sed compared to year end 2022 <span class=\"_ _e\"></span><span class=\"ff42 ls8f\">(\u20ac</span>444.9 million).  The release<span class=\"_ _2\"></span> of the deferral account is determined in the tariff setting process. The a<span class=\"_ _e\"></span>mounts on the deferral account are recognised on a yearly ba<span class=\"_ _2\"></span>sis and the release depends on the source of the deferral, some are released in T+1, whilst <span class=\"_ _e\"></span>others are released in T+2 and some are re<span class=\"_ _2\"></span>leased after a longer period<span class=\"_ _e\"></span> of time. The future<span class=\"_ _2\"></span> release of the deferral account fr<span class=\"_ _e\"></span>om the settlement mecha<span class=\"_ _2\"></span>nism to the future tariffs is set out in the table below (situ<span class=\"_ _e\"></span>ation on 31 December 2022): (in \u20ac million)<span class=\"ff40\"> </span>Belgian regu<span class=\"_ _2\"></span>latory German regulatory framework framework To be<span class=\"_ _2\"></span> refunded to the tariffs in the current regulatory peri<span class=\"_ _e\"></span>od 156.7  102.6  To be<span class=\"_ _2\"></span> refunded to the tariffs in the next regulatory period (or after)<span class=\"_ _e\"></span> 200.8  28.6  Other regula<span class=\"_ _2\"></span>tory transfer<span class=\"_ _e\"></span> 3.1  0.0  Total regu<span class=\"_ _2\"></span>latory deferr<span class=\"_ _e\"></span>al account 360.6 131.3 *Belgium: from 2020 to 2023 ;  Germany: from 2019 to 2023 The o<span class=\"_ _2\"></span>ther regulatory transfer relates to a revenue from incentive regulation which is subject to uncertainty in the particula<span class=\"_ _e\"></span>r context of a significant increase of energy <span class=\"_ _2\"></span>prices and for which the calculation method <span class=\"_ _e\"></span>should be further assessed with the Belgian regulator<span class=\"fs11 fc21\">.<span class=\"_ _e\"></span> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDeferredIncomeExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__111": {
   "value": "6.20. <span class=\"_ _92\"> </span>Accruals<span class=\"_ _e\"></span> and deferred income (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Accruals and<span class=\"_ _2\"></span> deferred income 91.4 11.4 Deferra<span class=\"_ _2\"></span>l account from settlement mechanism Belgian regulatory framework<span class=\"_ _e\"></span> 360.6 353.5 Deferra<span class=\"_ _2\"></span>l account from settlement mechanism German regulatory framework<span class=\"_ _e\"></span> 131.3 444.9 Total 583.3 809.8 The movements in the deferral account from the settlement mechanism are as follows: (in \u20ac million)<span class=\"ff40\"> </span>Regulatory Regulatory Total claims obligations Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 92.9 (891.3) (798.4) Increase 787.8 (786.7) 1.1 Reversals (5.9) 122.6 116.7 Utilisation 0.0 125.7 125.7 Other (e.g. discoun<span class=\"_ _2\"></span>ting)<span class=\"_ _e\"></span> 0.6 62.4 63.0 Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 875.3 (1,367.2) (491.9) In the <span class=\"ff40\">Elia<span class=\"_ _2\"></span> Transmission segment<span class=\"ff3f\">, the deferral account from the <span class=\"ff42\">settlement mechanism (\u20ac3</span><span class=\"ls5b\">60<span class=\"_ _e\"></span></span>.6 million) decreased compared with </span></span>year end 2021 <span class=\"ff42 ls8f\">(\u20ac</span><span class=\"ls5b\">353</span>.5 million). The decrease in the defer<span class=\"_ _e\"></span>ral account fr<span class=\"_ _2\"></span>om the settle<span class=\"_ _e\"></span>ment mechanism encompasses the settlement of net surpluses from the pr<span class=\"_ _2\"></span>ior tariff period (-<span class=\"ff42\">\u20ac1<span class=\"_ _e\"></span>25.7 million), the review of the regulator on previou<span class=\"_ _2\"></span>s year\u2019<span class=\"ff3f\">s </span>s<span class=\"_ _e\"></span>ettlement mechanism (+\u20ac<span class=\"ff3f\">6.2 </span></span>million) and the operating surplu<span class=\"_ _2\"></span>s generated in the curren<span class=\"_ _e\"></span>t year over the budget approved by the re<span class=\"ff42\">gulator (+\u20ac130.8 million)</span>. Any opera<span class=\"_ _2\"></span>ting surplus/deficit, in relation to the budget of the costs and revenues authorised by the regulator, needs to be returned to<span class=\"ls0\">/refunded by the consumers and therefore does not form part of the revenues.  </span>In 2022, there w<span class=\"ff42\">as an operational surplus (<span class=\"_ _2\"></span>\u20ac 130.8<span class=\"ff3f\"> million<span class=\"_ _e\"></span>), reported as an additional regulatory obligation. This operating excess is </span></span>primar<span class=\"_ _2\"></span>ily a result of higher <span class=\"ff42\">tariff sales (\u20ac247.0 million) and non</span>-<span class=\"ff42\">co<span class=\"_ _e\"></span>ntrollable revenue (\u20ac396.7 million) driven b<span class=\"_ _2\"></span>y the cr<span class=\"_ _e\"></span>oss<span class=\"_ _e\"></span><span class=\"ff3f\">-border revenue </span></span>partly off<span class=\"_ _2\"></span>set by increased non controllable costs. <span class=\"_ _e\"></span> In the <span class=\"ff40\">50Hertz Transmission segment</span>, the deferral accounts from the <span class=\"ff42\">settlement mechanism (\u20ac</span><span class=\"ls5b\">131</span>.3 million) is th<span class=\"_ _e\"></span>e nominal amount of \u20ac<span class=\"ff3f ls5b\">209<span class=\"ls0\">.3 </span></span>million (\u20ac4<span class=\"ff3f ls5b\">47<span class=\"ls0\">.1 </span></span>million as of 31 December 2021) le<span class=\"_ _e\"></span>ss an interest e<span class=\"_ _2\"></span>ffect of \u20ac<span class=\"_ _e\"></span><span class=\"ff3f ls5b\">78<span class=\"ls0\">.0 million </span></span>(\u20ac2.2 million in 2021)<span class=\"ff3f\">.<span class=\"_ _e\"></span> The net position </span>decrea<span class=\"_ _2\"></span>sed compared to year end 2022 <span class=\"_ _e\"></span><span class=\"ff42 ls8f\">(\u20ac</span>444.9 million).  The release<span class=\"_ _2\"></span> of the deferral account is determined in the tariff setting process. The a<span class=\"_ _e\"></span>mounts on the deferral account are recognised on a yearly ba<span class=\"_ _2\"></span>sis and the release depends on the source of the deferral, some are released in T+1, whilst <span class=\"_ _e\"></span>others are released in T+2 and some are re<span class=\"_ _2\"></span>leased after a longer period<span class=\"_ _e\"></span> of time. The future<span class=\"_ _2\"></span> release of the deferral account fr<span class=\"_ _e\"></span>om the settlement mecha<span class=\"_ _2\"></span>nism to the future tariffs is set out in the table below (situ<span class=\"_ _e\"></span>ation on 31 December 2022): (in \u20ac million)<span class=\"ff40\"> </span>Belgian regu<span class=\"_ _2\"></span>latory German regulatory framework framework To be<span class=\"_ _2\"></span> refunded to the tariffs in the current regulatory peri<span class=\"_ _e\"></span>od 156.7  102.6  To be<span class=\"_ _2\"></span> refunded to the tariffs in the next regulatory period (or after)<span class=\"_ _e\"></span> 200.8  28.6  Other regula<span class=\"_ _2\"></span>tory transfer<span class=\"_ _e\"></span> 3.1  0.0  Total regu<span class=\"_ _2\"></span>latory deferr<span class=\"_ _e\"></span>al account 360.6 131.3 *Belgium: from 2020 to 2023 ;  Germany: from 2019 to 2023 The o<span class=\"_ _2\"></span>ther regulatory transfer relates to a revenue from incentive regulation which is subject to uncertainty in the particula<span class=\"_ _e\"></span>r context of a significant increase of energy <span class=\"_ _2\"></span>prices and for which the calculation method <span class=\"_ _e\"></span>should be further assessed with the Belgian regulator<span class=\"fs11 fc21\">.<span class=\"_ _e\"></span> </span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfOtherCurrentLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__125": {
   "value": "7.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Group structure </span>OVERVIEW OF GROUP STRUCTURE SUBSIDI<span class=\"_ _e\"></span>ARIES Elia Group SA/NV has direct and indire<span class=\"_ _2\"></span>ct control of the subsidiaries listed below.<span class=\"_ _e\"></span> Elia Grid International Pte L<span class=\"_ _2\"></span>td (Singapore) ceased its ope<span class=\"_ _e\"></span>rations in June 2022. A new subsid<span class=\"_ _2\"></span>iary has been created in Canada, Elia Grid Internationa<span class=\"_ _2\"></span>l Inc. This subsidiary will <span class=\"_ _e\"></span>coordinate the activities of Elia Grid Internationa<span class=\"_ _2\"></span>l in North America<span class=\"ls95\">. </span> All the entities keep their accounts in<span class=\"_ _2\"></span> euros and <span class=\"_ _e\"></span>have the same reporting date as Elia Group SA/NV. Country of<span class=\"_ _2\"></span> Name Headquarters Stake % establish<span class=\"_ _2\"></span>ment<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Subsid<span class=\"_ _2\"></span>iaries<span class=\"_ _e\"></span> Elia Transm<span class=\"_ _2\"></span>ission Belgium SA/NV Belgium  Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"ff3f\">  </span>99.99 99.99 Elia Asset SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>99.99 99.99 Elia Engineering<span class=\"_ _2\"></span> SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 100.00 Elia Re SA Luxembourg Rue de Merl 6<span class=\"_ _2\"></span>5, 2146 Luxembourg<span class=\"_ _e\"></span> 100.00 100.00 Elia Grid International SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Bussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>90.00 90.00 Elia Grid International Gm<span class=\"_ _2\"></span>BH<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 90.00 90.00 Al Akaria Plaza Olaya Str<span class=\"_ _2\"></span>eet, <span class=\"_ _e\"></span> Elia Grid International LL<span class=\"_ _2\"></span>C<span class=\"_ _e\"></span> Saudi Arabia Al Olaya Riyadh 1<span class=\"_ _2\"></span>1622 <span class=\"_ _e\"></span> 90.00 90.00 Elia Grid International Pte. <span class=\"_ _2\"></span>Ltd.<span class=\"_ _e\"></span> Singapore 20 Collyer Quay #09-01, Singapore 049319 - 90.00 Elia Grid International In<span class=\"_ _2\"></span>c.<span class=\"_ _e\"></span> Canada 1500<span class=\"ls0\">-850 2 ST SW, T2P0R8 Calgary </span>90.00 - Eurogrid International SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 100.00 Eurogrid GmbH  German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 80.00 80.00 50Hertz Tran<span class=\"_ _2\"></span>smission GmbH <span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 80.00 80.00 50Hertz O<span class=\"_ _2\"></span>ffshore GmbH  German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 80.00 80.00 Re.Alto-Energ<span class=\"_ _2\"></span>y BV/SRL<span class=\"_ _e\"></span> Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 100.00 Re.Alto-Energ<span class=\"_ _2\"></span>y GmbH<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Ratingstra\u00dfe 9<span class=\"_ _2\"></span>, 40213 Dusseldorf<span class=\"_ _e\"></span> 100.00 100.00 WindGrid SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 - Investments accounted fo<span class=\"_ _2\"></span>r using the equity-met<span class=\"_ _e\"></span>hod <span class=\"ff43\">\u2013</span> Joint Ventures Nemo Link Ltd. United Kingdom Strand 1-3, London WC2N 5EH 50.00 50.00 Investments accounted fo<span class=\"_ _2\"></span>r using the equity-met<span class=\"_ _e\"></span>hod <span class=\"ff43\">\u2013</span> Associates H.G.R.T S.A.S.  France 1 Terrasse Be<span class=\"_ _2\"></span>llini, 92919 La D\u00e9fense Cedex<span class=\"_ _e\"></span> 17.00 17.00 Coreso SA/NV Belgium Avenue de<span class=\"_ _2\"></span> Cortenbergh 71, 1000 Brussels<span class=\"_ _e\"></span> 22.16 22.16 Investments accounted fo<span class=\"_ _2\"></span>r using IFRS9 - o<span class=\"_ _e\"></span>ther shareholdings JAO SA Luxembourg 2, Rue de Bitbourg, 1273 Lu<span class=\"_ _2\"></span>xembourg Hamm<span class=\"_ _e\"></span> 7.20 7.20 European Energ<span class=\"_ _2\"></span>y Exchange (EEX)<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Augustusplatz<span class=\"_ _2\"></span> 9, 0409 Leipzig<span class=\"_ _e\"></span> 4.32 4.32 TSCNET Services Gm<span class=\"_ _2\"></span>bH<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Dingolfinger Strasse<span class=\"_ _2\"></span> 3, 81673 Munich<span class=\"_ _e\"></span> 5.36 5.36 Kurt-Sanderling-Akademie des Konzerthausorchester<span class=\"_ _2\"></span> Berlin<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Gendarmenmarkt<span class=\"_ _2\"></span>, 10117 Berlin<span class=\"_ _e\"></span> 8.32 8.32",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSignificantInvestmentsInSubsidiariesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__124": {
   "value": "7.<span class=\"ls0\"> <span class=\"_ _24e\"> </span>Group structure </span>OVERVIEW OF GROUP STRUCTURE SUBSIDI<span class=\"_ _e\"></span>ARIES Elia Group SA/NV has direct and indire<span class=\"_ _2\"></span>ct control of the subsidiaries listed below.<span class=\"_ _e\"></span> Elia Grid International Pte L<span class=\"_ _2\"></span>td (Singapore) ceased its ope<span class=\"_ _e\"></span>rations in June 2022. A new subsid<span class=\"_ _2\"></span>iary has been created in Canada, Elia Grid Internationa<span class=\"_ _2\"></span>l Inc. This subsidiary will <span class=\"_ _e\"></span>coordinate the activities of Elia Grid Internationa<span class=\"_ _2\"></span>l in North America<span class=\"ls95\">. </span> All the entities keep their accounts in<span class=\"_ _2\"></span> euros and <span class=\"_ _e\"></span>have the same reporting date as Elia Group SA/NV. Country of<span class=\"_ _2\"></span> Name Headquarters Stake % establish<span class=\"_ _2\"></span>ment<span class=\"_ _e\"></span> 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Subsid<span class=\"_ _2\"></span>iaries<span class=\"_ _e\"></span> Elia Transm<span class=\"_ _2\"></span>ission Belgium SA/NV Belgium  Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"ff3f\">  </span>99.99 99.99 Elia Asset SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>99.99 99.99 Elia Engineering<span class=\"_ _2\"></span> SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 100.00 Elia Re SA Luxembourg Rue de Merl 6<span class=\"_ _2\"></span>5, 2146 Luxembourg<span class=\"_ _e\"></span> 100.00 100.00 Elia Grid International SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Bussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>90.00 90.00 Elia Grid International Gm<span class=\"_ _2\"></span>BH<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 90.00 90.00 Al Akaria Plaza Olaya Str<span class=\"_ _2\"></span>eet, <span class=\"_ _e\"></span> Elia Grid International LL<span class=\"_ _2\"></span>C<span class=\"_ _e\"></span> Saudi Arabia Al Olaya Riyadh 1<span class=\"_ _2\"></span>1622 <span class=\"_ _e\"></span> 90.00 90.00 Elia Grid International Pte. <span class=\"_ _2\"></span>Ltd.<span class=\"_ _e\"></span> Singapore 20 Collyer Quay #09-01, Singapore 049319 - 90.00 Elia Grid International In<span class=\"_ _2\"></span>c.<span class=\"_ _e\"></span> Canada 1500<span class=\"ls0\">-850 2 ST SW, T2P0R8 Calgary </span>90.00 - Eurogrid International SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 100.00 Eurogrid GmbH  German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 80.00 80.00 50Hertz Tran<span class=\"_ _2\"></span>smission GmbH <span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 80.00 80.00 50Hertz O<span class=\"_ _2\"></span>ffshore GmbH  German<span class=\"_ _2\"></span>y Heidestra\u00dfe 2<span class=\"_ _2\"></span>, 10557 Berlin<span class=\"_ _e\"></span> 80.00 80.00 Re.Alto-Energ<span class=\"_ _2\"></span>y BV/SRL<span class=\"_ _e\"></span> Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 100.00 Re.Alto-Energ<span class=\"_ _2\"></span>y GmbH<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Ratingstra\u00dfe 9<span class=\"_ _2\"></span>, 40213 Dusseldorf<span class=\"_ _e\"></span> 100.00 100.00 WindGrid SA/NV Belgium Bd de l\u2019Emper<span class=\"_ _2\"></span>eur 20, 1000 Brussels<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>100.00 - Investments accounted fo<span class=\"_ _2\"></span>r using the equity-met<span class=\"_ _e\"></span>hod <span class=\"ff43\">\u2013</span> Joint Ventures Nemo Link Ltd. United Kingdom Strand 1-3, London WC2N 5EH 50.00 50.00 Investments accounted fo<span class=\"_ _2\"></span>r using the equity-met<span class=\"_ _e\"></span>hod <span class=\"ff43\">\u2013</span> Associates H.G.R.T S.A.S.  France 1 Terrasse Be<span class=\"_ _2\"></span>llini, 92919 La D\u00e9fense Cedex<span class=\"_ _e\"></span> 17.00 17.00 Coreso SA/NV Belgium Avenue de<span class=\"_ _2\"></span> Cortenbergh 71, 1000 Brussels<span class=\"_ _e\"></span> 22.16 22.16 Investments accounted fo<span class=\"_ _2\"></span>r using IFRS9 - o<span class=\"_ _e\"></span>ther shareholdings JAO SA Luxembourg 2, Rue de Bitbourg, 1273 Lu<span class=\"_ _2\"></span>xembourg Hamm<span class=\"_ _e\"></span> 7.20 7.20 European Energ<span class=\"_ _2\"></span>y Exchange (EEX)<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Augustusplatz<span class=\"_ _2\"></span> 9, 0409 Leipzig<span class=\"_ _e\"></span> 4.32 4.32 TSCNET Services Gm<span class=\"_ _2\"></span>bH<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Dingolfinger Strasse<span class=\"_ _2\"></span> 3, 81673 Munich<span class=\"_ _e\"></span> 5.36 5.36 Kurt-Sanderling-Akademie des Konzerthausorchester<span class=\"_ _2\"></span> Berlin<span class=\"_ _e\"></span> German<span class=\"_ _2\"></span>y Gendarmenmarkt<span class=\"_ _2\"></span>, 10117 Berlin<span class=\"_ _e\"></span> 8.32 8.32",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCompositionOfGroupExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__126": {
   "value": "8.1. <span class=\"_ _87\"> </span>Financial risk and derivative management  PRINCI<span class=\"_ _e\"></span>PLES OF FINA<span class=\"_ _2\"></span>NCIAL RISK MANAGEMENT The Group aims to<span class=\"_ _2\"></span> identify each risk and sets out strategi<span class=\"_ _e\"></span>es to control the<span class=\"ls1c\">ir</span> economic impact on the Group's results. The Risk M<span class=\"_ _2\"></span>anagement Department defines the <span class=\"_ _e\"></span>risk management strategy, monitors risk analyses and reports to management and the Audit Committee. The fin<span class=\"_ _2\"></span>ancial risk policy is implemented by determining appropriate policies and setting up effective control and repor<span class=\"_ _2\"></span>ting procedures. Selected derivative hedging instru<span class=\"_ _e\"></span>ments are used depend<span class=\"_ _2\"></span>ing on the assessment of the risk involved. Deriv<span class=\"_ _e\"></span>atives are used exclusive<span class=\"_ _2\"></span>ly as hedging instruments. The regulatory framework in which the Group operates significantly restricts thei<span class=\"_ _e\"></span>r effects on profit or lo<span class=\"_ _2\"></span>ss (see the section 'Regulatory framework and tariffs'). The major impact of increased interest rates, c<span class=\"_ _e\"></span>redit risk, etc. can be settled in the tariffs, in a<span class=\"_ _2\"></span>ccordance with the applicable legi<span class=\"_ _e\"></span>slation. MARKET RISK The market risk take<span class=\"_ _2\"></span>s into account negative effects on the financial positi<span class=\"_ _e\"></span>on and cash flows of the group arising as a result of price changes on the market which cannot be otherwise avoided. The activities o<span class=\"_ _2\"></span>f the grou<span class=\"_ _e\"></span>p extend to the ele<span class=\"_ _2\"></span>ctricity mark<span class=\"_ _e\"></span>et <span class=\"ff42\">\u2013</span> in particular through selling<span class=\"_ _2\"></span> the electricity generated from renewa<span class=\"_ _e\"></span>ble energy as well as the procurement of energy to cover grid energ<span class=\"_ _2\"></span>y losses <span class=\"ff42\">\u2013</span> <span class=\"_ _e\"></span>as well as to th<span class=\"_ _2\"></span>e market for short-term deposits. In Germany, t<span class=\"ls5b\">he </span>gr<span class=\"_ _e\"></span>oup counteracts the procurement price risk for grid loss energy by hedging<span class=\"_ _2\"></span> prices at an early stage using futures contracts on the EEX electricity exchange<span class=\"_ _20\"></span> Foreign curren<span class=\"_ _e\"></span>cy risk<span class=\"_ _2\"></span> <span class=\"_ _251\"> </span> The group<span class=\"_ _2\"></span> is not exposed to any significant currency risk, <span class=\"_ _e\"></span>either from transa<span class=\"_ _2\"></span>ctions or from exchanging foreign currencies into euro, si<span class=\"_ _e\"></span>nce it has no material foreign investments or activities and less than 1<span class=\"_ _2\"></span>% of its costs are expressed in currencies other than euro<span class=\"_ _e\"></span>s. Inter<span class=\"_ _e\"></span>est rate risk<span class=\"_ _2\"></span> Intere<span class=\"_ _2\"></span>st rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of c<span class=\"_ _e\"></span>hanges in market interest rate<span class=\"_ _2\"></span>s. The Group's exposure to the risk of changes in market interest rates relates prima<span class=\"_ _e\"></span>rily to its long-term debt obligations with floating interest<span class=\"_ _2\"></span> rates. As at 31 December 2022, 5 interest<span class=\"_ _e\"></span>-rate swaps were outstanding in connection with pre-hedgi<span class=\"_ _e\"></span>ng of probable forecasted debt transactions. T<span class=\"_ _2\"></span>he interest rate swaps on the other loan and the loan with Publi-Part to cover a nominal debt amount of \u20ac300 m<span class=\"_ _2\"></span>illion were settled in June 2020, together with the repayment of the loans. <span class=\"_ _e\"></span><span class=\"ff3f\"> </span>See Note 6.13 for a summa<span class=\"_ _2\"></span>ry of the outstanding loans an<span class=\"_ _e\"></span>d their respective interest rates. CREDIT RISK Credit risk encompasses a<span class=\"_ _2\"></span>ll forms of counterparty exposure, i.e. where counterparties may default on their obligations to the group in relation to lend<span class=\"_ _2\"></span>ing, hedging, settlement and other financial activities. The group is exposed to credit risk from its op<span class=\"_ _e\"></span>erating activities and treasur<span class=\"_ _2\"></span>y activities. With regards <span class=\"ls1d\">to<span class=\"_ _e\"></span></span> its operating activities, the group <span class=\"ff42\">has a credit policy in place, which takes into account cu<span class=\"_ _2\"></span>stomer\u2019s risk </span>profiles. The e<span class=\"_ _2\"></span>xposure to credit risk is monitored on an ongoing basis, resulting in a request to issue bank guaranties from t<span class=\"_ _e\"></span>he counterparty<span class=\"_ _2\"></span> for some major contracts.<span class=\"_ _e\"></span> At the end<span class=\"_ _2\"></span> of the reporting period there were no significant concentrations of credit risks. The maximum credit risk is the carrying amoun<span class=\"_ _2\"></span>t for each financial asset, including derivative financial instruments.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Note 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Immedia<span class=\"_ _2\"></span>tely claimable deposits<span class=\"_ _e\"></span> 7.0  7.0  Reimbursemen<span class=\"_ _2\"></span>t rights<span class=\"_ _e\"></span> 34.6  46.2  Other shareholding<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> 75.6  43.8  Derivatives (<span class=\"_ _2\"></span>Current and Non-current)<span class=\"_ _e\"></span> 219.7  355.6  Other financial <span class=\"_ _2\"></span>assets (Current and Non-c<span class=\"_ _e\"></span>urrent) (6.6) 336.9  452.5  Non-current t<span class=\"_ _2\"></span>rade and other r<span class=\"_ _e\"></span>eceivables 95.5  0.5  Trade and other receiv<span class=\"_ _2\"></span>ables (6.9) 1,206.2  861.3  Current tax<span class=\"_ _2\"></span> assets<span class=\"_ _e\"></span> (6.10) 28.6  10.1  Cash and cash<span class=\"_ _2\"></span> equivalents<span class=\"_ _e\"></span> (6.11) 4,151.2  3,049.5  Deferred charges (6.9) 25.1  18.1  Total 5,843.5  4,392.0  The movement in the allowance for expe<span class=\"_ _2\"></span>cted credit losses<span class=\"_ _e\"></span> in relation to trade receivables during the year was as outlined in the table below: <span class=\"_ _15e\"> </span> (in \u20ac million)<span class=\"ff40\"> </span>Bad debtors Impairment losses Remaining ba<span class=\"_ _2\"></span>lance<span class=\"_ _e\"></span> Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 201.5  (201.0) 0.4  Changes during the year (0.1) 0.2  0.1  Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 201.4  (200.8) 0.5  Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 201.4  (200.8) 0.5  Changes during the year 0.8  (0.8) 0.0  Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 202.2  (201.7) 0.5  Almost all bad<span class=\"_ _2\"></span> debtors are related to outstanding receivables <span class=\"_ _e\"></span>linked to the regulatory levies in Germany. If a debtor <span class=\"_ _e\"></span>goes bankrupt, 50Hertz Tran<span class=\"_ _2\"></span>smission is compensated by the reg<span class=\"_ _e\"></span>ulator for the loss incurred. The group<span class=\"_ _2\"></span> believes that the unimpaired amounts overdue by more than 30 <span class=\"_ _e\"></span>days are still collectible, based on historical payment behaviour and extensive an<span class=\"_ _2\"></span>alysis of customer credit risk, including customers' underlying credit ratings, when available. The<span class=\"_ _e\"></span> credit quality of trade<span class=\"_ _2\"></span> and other receivables is assessed based on a credit policy.<span class=\"_ _e\"></span> IFRS 9 requires <span class=\"_ _2\"></span>the group to impair financial assets based on a forward-looki<span class=\"_ _e\"></span>ng expected credit loss (ECL) approach. <span class=\"ff45\"> </span>As of 2022<span class=\"_ _2\"></span>, the group applies an individualized approach for trade receivables, for w<span class=\"_ _e\"></span>hich the Group has set ru<span class=\"_ _2\"></span>les fo<span class=\"_ _e\"></span>r defining the s<span class=\"_ _2\"></span>tage of the concer<span class=\"_ _2\"></span>ned asset for Expected Credit Loss (ECL) ca<span class=\"_ _e\"></span>lculations. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">sta<span class=\"_ _2\"></span>ge 1<span class=\"ff3f\"> covers financial assets that have not deteriorated significantly since initial recognition. The ECL for<span class=\"_ _2\"></span> stage<span class=\"_ _e\"></span> 1 <span class=\"_ _e\"></span>is calculated </span></span></span>on a 12-month basis, \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">sta<span class=\"_ _2\"></span>ge 2<span class=\"ff3f\"> covers financial assets for which the credit risk has significantly increased. The ECL for stage 2 is calculated on a lifetim<span class=\"_ _e\"></span><span class=\"ls5b\">e </span></span></span></span>basis. The decisio<span class=\"_ _2\"></span>n to move an asset from stage 1 to stage 2 is based on certain cr<span class=\"_ _e\"></span>iteria such as:  o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">a significant downgrade in the creditworthiness of a counterparty and/or its parent company and/or its guara<span class=\"_ _2\"></span>ntor (if <span class=\"_ _e\"></span>any), <span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">significant adverse changes in the regulatory environment, </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">changes in political or country-related risks, and  </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">any other aspect the Group may consider relevant.  </span></span>Regarding fina<span class=\"_ _2\"></span>ncial assets that are more than 30 days past due, the move to stage 2 is not systematically applied as long as t<span class=\"_ _e\"></span>he Group has rea<span class=\"_ _2\"></span>sonable and supporting infor<span class=\"_ _e\"></span>mation that demonstrates that, even if payments become more than 30 days past due, this does not repre<span class=\"_ _2\"></span>sent a significant increase in the credit risk since initial recognition.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">sta<span class=\"_ _2\"></span>ge 3<span class=\"ff3f\"> covers assets for which default has already been observed, such as:<span class=\"_ _e\"></span> </span></span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">when there is <span class=\"_ _2\"></span>evidence of failure in cre<span class=\"_ _2\"></span>dit support fr<span class=\"_ _2\"></span>om a parent company to<span class=\"_ _2\"></span> its subsidiary (in t<span class=\"_ _2\"></span>his case th<span class=\"_ _2\"></span>e subsidiary is the </span></span>Group\u2019s counterparty at r<span class=\"_ _2\"></span>isk),<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">when a Group entity has initiated legal proceedings against the counterparty for non-payment.<span class=\"_ _e\"></span> </span></span>Regarding fina<span class=\"_ _2\"></span>ncial assets that are more than 90 days pa<span class=\"_ _e\"></span>st due, the presumption can be<span class=\"_ _2\"></span> rebutted if the Group has reasonable and suppor<span class=\"_ _2\"></span>table information that demonstrates that even if pa<span class=\"_ _e\"></span>yments become<span class=\"_ _2\"></span> more than 90 days past due, this does not<span class=\"_ _e\"></span> indicate counterparty<span class=\"_ _2\"></span> default.<span class=\"_ _e\"></span> The ECL formula<span class=\"_ _2\"></span> applicable in stages 1 and 2 is ECL = E<span class=\"_ _e\"></span>AD x PD x LGD, where: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">for 1<span class=\"_ _2\"></span>2-month ECL, Exposure At Default (EAD) equals the carrying<span class=\"_ _2\"></span> amount of the financial asset, to which the relevant Probability </span></span>of Default (PD) an<span class=\"_ _2\"></span>d the Loss Given Default (LGD) are applied<span class=\"_ _e\"></span><span class=\"ls1d\">; <span class=\"_ _e\"></span></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">for life<span class=\"_ _2\"></span>time ECL, the calculation method consists in identifying changes in exposure for each year, especially the expected ti<span class=\"_ _e\"></span>ming </span></span>and amount of th<span class=\"_ _2\"></span>e contractual repayments, and then applying to each repayment the relevant PD and the LGD, and discounting<span class=\"_ _e\"></span> the figures ob<span class=\"_ _2\"></span>tained. ECL is then the sum of the discounted figures; and <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">pro<span class=\"_ _2\"></span>bability of default is the likelihood of default over a particular time horizon (in stage 1, this time horizon is 12 month<span class=\"_ _e\"></span>s after the </span></span>repor<span class=\"_ _2\"></span>ting period; in stage 2 this time horizon is the e<span class=\"_ _e\"></span>ntire lifetime of the financial asset). This informa<span class=\"_ _2\"></span>tion is based on external data from a<span class=\"_ _2\"></span> well-known rating agency. The PD depends on the time horizon and of the rating of the counterparty. <span class=\"_ _e\"></span> The Group uses externa<span class=\"_ _2\"></span>l ratings if they are available; <span class=\"_ _e\"></span>or an internal ra<span class=\"_ _2\"></span>ting for major counterparties with no external <span class=\"_ _e\"></span>rating.  Elia Group d<span class=\"_ _2\"></span>id not see any changes in payment behaviour, nor an increase in bad debtors as a consequence of the crisis in 202<span class=\"_ _e\"></span><span class=\"ls5b\">1 </span>(C<span class=\"ls0\">OVID-<span class=\"ls5b\">19</span>) nor in 2022 (energy crisis) and it does not ex<span class=\"_ _e\"></span>pect any major impact related to the pandemic to arise in the coming years.<span class=\"_ _e\"></span> </span>Subsequently, a loss <span class=\"_ _2\"></span>given default is calculated as the percentage of the amount of trade receivables that is not covered b<span class=\"_ _2\"></span>y <span class=\"_ _e\"></span>a ba<span class=\"_ _e\"></span>nk guarantee.<span class=\"_ _2\"></span> <span class=\"ff42\">The total outstanding amount of trade receivables covered by a bank guarantee totals \u20ac97.1 million. The loss given default<span class=\"_ _e\"></span></span> is multiplied b<span class=\"_ _2\"></span>y the outstanding trade receivables.<span class=\"_ _e\"></span> This approa<span class=\"_ _2\"></span>ch is deemed more relevant than the portfolio approach to provid<span class=\"_ _e\"></span>e a better assessment of the risk, especially in the current context o<span class=\"_ _2\"></span>f volatile market conditions. The impact of this new approach is not significant. Furthermore, any <span class=\"_ _e\"></span>losses would be recoverable through the<span class=\"_ _2\"></span> tariffs. <span class=\"_ _e\"></span> The model is applied to the<span class=\"_ _2\"></span> trade receivables, all other fin<span class=\"_ _e\"></span>ancial assets<span class=\"_ _2\"></span> being not assessed at risk of impairment co<span class=\"_ _e\"></span>nsidering<span class=\"_ _2\"></span> their nature (regu<span class=\"_ _2\"></span>latory assets, amounts recoverable through future tariffs in compliance with the regulatory frameworks), risk profile (reliable counterparty<span class=\"_ _2\"></span> being for the levies the Belgian/German stat<span class=\"_ _e\"></span>e) or measurement metho<span class=\"_ _2\"></span>d (at fair value). More details are provided in the different note<span class=\"_ _2\"></span>s.<span class=\"_ _e\"></span> LIQUIDITY RISK Liquidity r<span class=\"_ _2\"></span>isk is the risk that the group <span class=\"_ _e\"></span>may be unable to meet its financial obligations. The group limits this risk by constantly monitoring cash flows and en<span class=\"_ _2\"></span>suring that there are always sufficient credit<span class=\"_ _e\"></span>-line facilities available. The <span class=\"ff42\">group<span class=\"_ _2\"></span>\u2019s <span class=\"ff3f\">objective is to maintain a balance between continuity of<span class=\"_ _e\"></span> funding and flexibility through the use of bank loans, co<span class=\"_ _2\"></span>nfirmed and </span></span>unconfirmed credit facilities, commer<span class=\"_ _2\"></span>cial paper program<span class=\"ls57\">me</span>s, etc. For medium- to long-term funding, the group uses bonds. The maturity profile o<span class=\"_ _2\"></span>f the debt portfolio is spread over several ye<span class=\"_ _e\"></span>ars. The Group Treasury frequently assesses its funding resources taking in<span class=\"_ _2\"></span>to account its own credit ra<span class=\"_ _2\"></span>ting and general market conditions.<span class=\"_ _e\"></span> Bond issuance<span class=\"_ _2\"></span>s realised ove<span class=\"_ _e\"></span>r the last years and loan contracts signed with EIB and other banks prove that the group has access to different sour<span class=\"_ _2\"></span>ces of funding.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Expected Closing 6-<span class=\"ls5b\">12 </span>1-<span class=\"ls5b\">2 </span>2-<span class=\"ls5b\">5 </span>&gt; 5 Face value cash 6 months balance months years years years outflows Non-derivat<span class=\"_ _2\"></span>ive financial liabilities 11,546<span class=\"_ _2\"></span>.5 <span class=\"_ _e\"></span> 11,513<span class=\"_ _2\"></span>.3 <span class=\"_ _e\"></span> (12,352.6) (3,878.3) (25.6) (897.5) (2,128.6) (5,422.6) Unsecured bond issues 7,281.7  7,248.5  (8,124.1) (103.6) (23.6) (877.1) (1,820.6) (5,299.2) Unsecured finan<span class=\"_ _2\"></span>cial bank loans and interest accruals 568.4  568.4  (532.1) (78.4) (2.0) (20.4) (308.0) (123.4) Trade and<span class=\"_ _2\"></span> other payables<span class=\"_ _e\"></span> 3,696.4  3,696.4  (3,696.4) (3,696.4) 0.0  0.0  0.0  0.0  Total at<span class=\"_ _2\"></span> 31 December 2021<span class=\"ls0\"> </span>11,546<span class=\"_ _2\"></span>.5 <span class=\"_ _e\"></span> 11,513<span class=\"_ _2\"></span>.3 <span class=\"_ _e\"></span> (12,352.6) (3,878.3) (25.6) (897.5) (2,128.6) (5,422.6) (in \u20ac million)<span class=\"ff40\"> </span>Expected Closing 6-<span class=\"ls5b\">12 </span>1-<span class=\"ls5b\">2 </span>2-<span class=\"ls5b\">5 </span>&gt; 5 Face value cash 6 months balance months years years years outflows Non-derivat<span class=\"_ _2\"></span>ive financial liabilities 13,327<span class=\"_ _2\"></span>.1 <span class=\"_ _e\"></span> 13,296<span class=\"_ _2\"></span>.7 <span class=\"_ _e\"></span> (14,979.8) (4,925.7) (800.5) (659.5) (1,923.7) (6,670.4) Unsecured bond issues 7,273.3  7,243.0  (8,972.9) (103.5) (798.2) (639.3) (1,620.9) (5,811.0) Unsecured finan<span class=\"_ _2\"></span>cial bank loans and interest accruals 1,249.6  1,249.6  (1,202.7) (18.1) (2.3) (20.2) (302.8) (859.4) Trade and<span class=\"_ _2\"></span> other payables<span class=\"_ _e\"></span> 4,804.2  4,804.2  (4,804.2) (4,804.2) 0.0  0.0  0.0  0.0  Total at<span class=\"_ _2\"></span> 31 December 2022<span class=\"ls0\"> </span>13,327<span class=\"_ _2\"></span>.1 <span class=\"_ _e\"></span> 13,296<span class=\"_ _2\"></span>.7 <span class=\"_ _e\"></span> (14,979.8) (4,925.7) (800.5) (659.5) (1,923.7) (6,670.4) Details of th<span class=\"_ _2\"></span>e used and unused back-<span class=\"_ _e\"></span>up credit facilities are set out below: Availab<span class=\"_ _2\"></span>le Average basic<span class=\"_ _2\"></span> Amount Amount not<span class=\"_ _2\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Matu<span class=\"_ _2\"></span>rity<span class=\"_ _e\"></span> amount interest used used Sustainable Re<span class=\"_ _2\"></span>volving Credit Facility<span class=\"_ _e\"></span> 10/12/2025 650.0  Euribor + 0.325%  0.0  650.0  Confirmed cred<span class=\"_ _2\"></span>it line<span class=\"_ _e\"></span> 2/26/2025 750.0  Euribor + 0,275% 0.0  750.0  Confirmed cred<span class=\"_ _2\"></span>it line<span class=\"_ _e\"></span> 12/14/2026 150.0  Euribor + 0,275% 150.0  0.0  Straight L<span class=\"_ _2\"></span>oan EGI<span class=\"_ _e\"></span> unlimited 2.5  Euribor + 0.75<span class=\"_ _2\"></span>%<span class=\"_ _e\"></span> 0.0  2.5  Confirmed cred<span class=\"_ _2\"></span>it line<span class=\"_ _e\"></span> unlimited 35.0  Eurribor<span class=\"_ _2\"></span> + 0.2%<span class=\"_ _e\"></span> 0.0  35.0  av. 1M-<span class=\"_ _2\"></span>Euribor Confirmed cred<span class=\"_ _2\"></span>it line<span class=\"_ _e\"></span> unlimited 150.0  0.0  150.0  +0.275<span class=\"_ _2\"></span>%<span class=\"_ _e\"></span> Total 1,737.5  150.0  1,587.5  Since 2020, <span class=\"_ _2\"></span>the group has had several lines available to guarantee the financing of its activities and to cushion possible va<span class=\"_ _e\"></span>riations in levies (even if we can observe a<span class=\"_ _2\"></span> surplus for the last 2 years) or derivatives. Indeed, the hi<span class=\"_ _e\"></span>gh volume of futures contracts contracted by 50Hertz Tran<span class=\"_ _2\"></span>smission (Germany) also has an impact on t<span class=\"_ _e\"></span>he Group's liquidity management. The daily ca<span class=\"_ _2\"></span>sh settlem<span class=\"_ _e\"></span>ent of future<span class=\"_ _2\"></span>s contract<span class=\"_ _2\"></span>s with the exchange can have short<span class=\"_ _e\"></span>-term effects on liquidity, which largely follow the general price trend on the electricity market.<span class=\"_ _2\"></span>  <span class=\"_ _e\"></span> HEDGI<span class=\"_ _e\"></span>NG ACT<span class=\"_ _e\"></span>IVIT<span class=\"_ _e\"></span>IES AND<span class=\"_ _e\"></span> DER<span class=\"_ _e\"></span>IVATIVES<span class=\"_ _e\"></span> The group<span class=\"_ _2\"></span> is exposed to certain risks relating to its ongoing business operations. The primary risk managed using derivative instrument<span class=\"_ _e\"></span>s is interest rate risk. All financial der<span class=\"_ _2\"></span>ivatives entered into by the Group relate to an underlying transaction or forecast exposure, depending on th<span class=\"_ _e\"></span>e expected impact on the statement of pro<span class=\"_ _2\"></span>fit or loss, and if the IFRS 9<span class=\"_ _e\"></span> criteria are met, the group decides on a case-<span class=\"ls5b\">by<span class=\"_ _e\"></span></span>-case basis whether hedge accounting will be applied. Deri<span class=\"_ _e\"></span>vatives not des<span class=\"_ _2\"></span>ignated as hedging instruments<span class=\"ff3f fs8\"> </span>The group<span class=\"_ _2\"></span> had no derivatives which were <span class=\"_ _e\"></span>not designated as hedging instruments. Deri<span class=\"_ _e\"></span>vatives designated as<span class=\"_ _2\"></span> hedging instruments In 2018, t<span class=\"ls5b\">he </span>group hedged the interest rate risk linked to the acquisition of a 20% stake in 50Hertz Transmission (Germany) for which a bridge loan was <span class=\"_ _2\"></span>initially put in place. To cover the potential exposure to interest rate risk, the <span class=\"_ _e\"></span>group entered into a pre-hedge interest rate swap agreement in J<span class=\"_ _2\"></span>une 2018 to lock in m<span class=\"_ _e\"></span>arket interest <span class=\"ff42\">rates at the moment of the issuance of the \u20ac300 million senior<span class=\"_ _2\"></span> bond. The </span>group<span class=\"_ _2\"></span> applied hedge accounting as the derivative transaction met the requirements under IFRS 9. U<span class=\"_ _e\"></span>pon the settlement of the transact<span class=\"_ _2\"></span>ion in September 2018, the portion of the gain or l<span class=\"_ _e\"></span>oss on the derivative was recognised within hedging reserves and had an impact of \u20ac5.7million.<span class=\"ff3f\"> </span>These hedg<span class=\"_ _2\"></span>ing reserves <span class=\"_ _e\"></span>are recycled into profit and loss over the lifetime<span class=\"_ _2\"></span> of the underlying hedged instrument, i.e. the senior bond with 10<span class=\"ls0\">-year maturity. In 2022<span class=\"ff42\">, an amount of \u20ac0.6 million was recycled into profit and loss.</span> </span>The group<span class=\"_ _2\"></span> recognises derivatives to hedge the price for th<span class=\"_ _e\"></span>e future procurement of the physical requirement for grid losses tha<span class=\"_ _2\"></span>t is expected<span class=\"_ _2\"></span> in subsequent periods and is covered in each case by short-term procurement transactions on the spot <span class=\"_ _e\"></span>market.<span class=\"_ _2\"></span> These derivatives are measured at fair<span class=\"_ _2\"></span> value in OCI with no effe<span class=\"_ _e\"></span>ct on profit or loss as part of cash f<span class=\"_ _2\"></span>low hedge accounting; <span class=\"_ _e\"></span>they serve as price hedging<span class=\"_ _2\"></span> of the physical demand for electrical energy to cover grid losses (underlying transaction). Due to the availability a<span class=\"_ _e\"></span>nd liquidity of future<span class=\"_ _2\"></span>s trading, the hedging period for intended price hedging covers a period of up to two years from the balance sheet date. In this context, the Group pursues a co<span class=\"_ _2\"></span>nservative hedging strategy oriented towards the regulatory framework and the ability to roll <span class=\"_ _e\"></span>over the electricity procur<span class=\"_ _2\"></span>ement costs incurred, which enables tim<span class=\"_ _e\"></span>ely and predictable pr<span class=\"_ _2\"></span>ice hedging.  <span class=\"_ _e\"></span> The cr<span class=\"_ _2\"></span>itical term match method measures effectiveness. If the valuation-<span class=\"_ _e\"></span>relevant parameters of the hedged item and hedging instrument match, it <span class=\"_ _2\"></span>is assumed that an effective hedging relationshi<span class=\"_ _e\"></span>p exists and that changes in value from bo<span class=\"_ _2\"></span>th items offset each other. The <span class=\"_ _e\"></span>group strives for<span class=\"_ _2\"></span> full price hedging of the expected volume of grid loss energy (hedge ratio 1:1). <span class=\"_ _20\"></span> In 2022, the<span class=\"_ _2\"></span> group also entered into Interest Rate Swaps <span class=\"_ _e\"></span>contracts as pre-hedge for probable forecast debt transactions. The purpose of those instruments was to fix the<span class=\"_ _2\"></span> rate at which the g<span class=\"_ _e\"></span>roup will borro<span class=\"_ _2\"></span>w in the context of future bond issues plan<span class=\"_ _e\"></span>ned in 2023. This was performed<span class=\"_ _2\"></span> through 5 forward contracts<span class=\"ls95\">. </span> CAPITAL RISK <span class=\"_ _e\"></span>MANAGEMENT The purpo<span class=\"_ _2\"></span>se of the group's capital-structure management<span class=\"_ _e\"></span> is to ensure that the debt and equity ratios related to its regulated activities are as <span class=\"_ _2\"></span>closely aligned as possible with t<span class=\"_ _e\"></span>he recommended level set by the relevant regulatory frameworks.   The Company's d<span class=\"_ _2\"></span>ividend guidelines involve optimising dividend payments while bearing in mind that self<span class=\"_ _e\"></span>-financing capacity is needed to carry out its leg<span class=\"_ _2\"></span>al mission as transmission system operato<span class=\"_ _e\"></span>r, finan<span class=\"_ _2\"></span>ce future CAPEX projects and,<span class=\"_ _e\"></span> more generally, implement the g<span class=\"ff42\">roup\u2019s </span>strateg<span class=\"_ _2\"></span>y. The Company offer<span class=\"_ _2\"></span>s its employees the opportunity to sub<span class=\"_ _e\"></span>scribe to capital increases <span class=\"_ _2\"></span>that are exclusively reserved fo<span class=\"_ _e\"></span>r them<span class=\"_ _2\"></span>.<span class=\"_ _e\"></span> SUSTAIN<span class=\"_ _e\"></span>ABI<span class=\"_ _2\"></span>LITY<span class=\"ff3f fs8\"> </span>Sustainability lies a<span class=\"_ _2\"></span>t the heart of Elia<span class=\"ff42 ls1c\">\u2019s</span> strategy through its<span class=\"_ _e\"></span> ActNow program<span class=\"ls57\">me<span class=\"_ _2\"></span><span class=\"ls0\">, which sets out the long-term sustainability objectives of </span></span>the group. These are<span class=\"_ _2\"></span> guided by the UN Sustainable Development Goals (SDGs) and have been translated into KPIs which are reported<span class=\"_ _e\"></span> to the marke<span class=\"_ _2\"></span>t and grouped under the following five dime<span class=\"_ _e\"></span>nsions: Climate Action; Environment and Circular Economy; Health and Safety; Diversity, Equity a<span class=\"_ _2\"></span>nd Inclusion; and Governance, Ethics and Compliance. <span class=\"_ _e\"></span> Furtherm<span class=\"_ _2\"></span>ore, as a driver of the energy transition, Elia Group is committed to ensuring that its activities are strongly align<span class=\"_ _e\"></span>ed with the EU Taxonomy, a c<span class=\"_ _2\"></span>lassification system for sustainable economic activities. Elia Group therefore published in 2021 a whit<span class=\"_ _e\"></span>e paper which outlines the company\u2019s e<span class=\"_ _2\"></span>ligibility and alignment with the EU Taxonomy. The paper includes the methodology u<span class=\"_ _2\"></span>sed for <span class=\"_ _e\"></span><span class=\"ff3f\">the <span class=\"_ _e\"></span>assessment, </span>highlights t<span class=\"_ _2\"></span>he g<span class=\"ff42\">roup\u2019s implementation of sustainable tools and practices, and reinforces its commitment to oper<span class=\"_ _e\"></span></span>ating its businesses in a sustainable<span class=\"_ _2\"></span> way. In 2022, the group also se<span class=\"_ _e\"></span>t up an annual meeting which will address the embedding of su<span class=\"_ _2\"></span>stainability into decision<span class=\"_ _e\"></span>-making processe<span class=\"_ _2\"></span>s such as budget planning, strategic planning, and operational processes. Both ETB an<span class=\"_ _e\"></span>d 50Hertz appointed compliance<span class=\"_ _2\"></span> coordinators.<span class=\"_ _e\"></span> We refer<span class=\"_ _2\"></span> to our Integrated Report <span class=\"ls5b\">and <span class=\"_ _e\"></span></span>our Sustainability R<span class=\"_ _e\"></span>eport for further informa<span class=\"_ _2\"></span>tion.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialRiskManagementExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__129": {
   "value": "c<span class=\"_ _e\"></span>redit risk, etc. can be settled in the tariffs, in a<span class=\"_ _2\"></span>ccordance with the applicable legi<span class=\"_ _e\"></span>slation. MARKET RISK The market risk take<span class=\"_ _2\"></span>s into account negative effects on the financial positi<span class=\"_ _e\"></span>on and cash flows of the group arising as a result of price changes on the market which cannot be otherwise avoided. The activities o<span class=\"_ _2\"></span>f the grou<span class=\"_ _e\"></span>p extend to the ele<span class=\"_ _2\"></span>ctricity mark<span class=\"_ _e\"></span>et <span class=\"ff42\">\u2013</span> in particular through selling<span class=\"_ _2\"></span> the electricity generated from renewa<span class=\"_ _e\"></span>ble energy as well as the procurement of energy to cover grid energ<span class=\"_ _2\"></span>y losses <span class=\"ff42\">\u2013</span> <span class=\"_ _e\"></span>as well as to th<span class=\"_ _2\"></span>e market for short-term deposits. In Germany, t<span class=\"ls5b\">he </span>gr<span class=\"_ _e\"></span>oup counteracts the procurement price risk for grid loss energy by hedging<span class=\"_ _2\"></span> prices at an early stage using futures contracts on the EEX electricity exchange<span class=\"_ _20\"></span> Foreign curren<span class=\"_ _e\"></span>cy risk<span class=\"_ _2\"></span> <span class=\"_ _251\"> </span> The group<span class=\"_ _2\"></span> is not exposed to any significant currency risk, <span class=\"_ _e\"></span>either from transa<span class=\"_ _2\"></span>ctions or from exchanging foreign currencies into euro, si<span class=\"_ _e\"></span>nce it has no material foreign investments or activities and less than 1<span class=\"_ _2\"></span>% of its costs are expressed in currencies other than euro<span class=\"_ _e\"></span>s. Inter<span class=\"_ _e\"></span>est rate risk<span class=\"_ _2\"></span> Intere<span class=\"_ _2\"></span>st rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of c<span class=\"_ _e\"></span>hanges in market interest rate<span class=\"_ _2\"></span>s. The Group's exposure to the risk of changes in market interest rates relates prima<span class=\"_ _e\"></span>rily to its long-term debt obligations with floating interest<span class=\"_ _2\"></span> rates. As at 31 December 2022, 5 interest<span class=\"_ _e\"></span>-rate swaps were outstanding in connection with pre-hedgi<span class=\"_ _e\"></span>ng of probable forecasted debt transactions. T<span class=\"_ _2\"></span>he interest rate swaps on the other loan and the loan with Publi-Part to cover a nominal debt amount of \u20ac300 m<span class=\"_ _2\"></span>illion were settled in June 2020, together with the repayment of the loans. <span class=\"_ _e\"></span><span class=\"ff3f\"> </span>See Note 6.13 for a summa<span class=\"_ _2\"></span>ry of the outstanding loans an<span class=\"_ _e\"></span>d their respective interest rates. CREDIT RISK Credit risk encompasses a<span class=\"_ _2\"></span>ll forms of counterparty exposure, i.e. where counterparties may default on their obligations to the group in relation to lend<span class=\"_ _2\"></span>ing, hedging, settlement and other financial activities. The group is exposed to credit risk from its op<span class=\"_ _e\"></span>erating activities and treasur<span class=\"_ _2\"></span>y activities. With regards <span class=\"ls1d\">to<span class=\"_ _e\"></span></span> its operating activities, the group <span class=\"ff42\">has a credit policy in place, which takes into account cu<span class=\"_ _2\"></span>stomer\u2019s risk </span>profiles. The e<span class=\"_ _2\"></span>xposure to credit risk is monitored on an ongoing basis, resulting in a request to issue bank guaranties from t<span class=\"_ _e\"></span>he counterparty<span class=\"_ _2\"></span> for some major contracts.<span class=\"_ _e\"></span> At the end<span class=\"_ _2\"></span> of the reporting period there were no significant concentrations of credit risks. The maximum credit risk is the carrying amoun<span class=\"_ _2\"></span>t for each financial asset, including derivative financial instruments.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Note 2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Immedia<span class=\"_ _2\"></span>tely claimable deposits<span class=\"_ _e\"></span> 7.0  7.0  Reimbursemen<span class=\"_ _2\"></span>t rights<span class=\"_ _e\"></span> 34.6  46.2  Other shareholding<span class=\"_ _2\"></span>s<span class=\"_ _e\"></span> 75.6  43.8  Derivatives (<span class=\"_ _2\"></span>Current and Non-current)<span class=\"_ _e\"></span> 219.7  355.6  Other financial <span class=\"_ _2\"></span>assets (Current and Non-c<span class=\"_ _e\"></span>urrent) (6.6) 336.9  452.5  Non-current t<span class=\"_ _2\"></span>rade and other r<span class=\"_ _e\"></span>eceivables 95.5  0.5  Trade and other receiv<span class=\"_ _2\"></span>ables (6.9) 1,206.2  861.3  Current tax<span class=\"_ _2\"></span> assets<span class=\"_ _e\"></span> (6.10) 28.6  10.1  Cash and cash<span class=\"_ _2\"></span> equivalents<span class=\"_ _e\"></span> (6.11) 4,151.2  3,049.5  Deferred charges (6.9) 25.1  18.1  Total 5,843.5  4,392.0  The movement in the allowance for expe<span class=\"_ _2\"></span>cted credit losses<span class=\"_ _e\"></span> in relation to trade receivables during the year was as outlined in the table below: <span class=\"_ _15e\"> </span> (in \u20ac million)<span class=\"ff40\"> </span>Bad debtors Impairment losses Remaining ba<span class=\"_ _2\"></span>lance<span class=\"_ _e\"></span> Balance at 1<span class=\"_ _2\"></span> January 2021<span class=\"_ _e\"></span> 201.5  (201.0) 0.4  Changes during the year (0.1) 0.2  0.1  Balance at 31 Dec<span class=\"_ _2\"></span>ember 2021 201.4  (200.8) 0.5  Balance at 1<span class=\"_ _2\"></span> January 2022<span class=\"_ _e\"></span> 201.4  (200.8) 0.5  Changes during the year 0.8  (0.8) 0.0  Balance at 31 Dec<span class=\"_ _2\"></span>ember 2022 202.2  (201.7) 0.5  Almost all bad<span class=\"_ _2\"></span> debtors are related to outstanding receivables <span class=\"_ _e\"></span>linked to the regulatory levies in Germany. If a debtor <span class=\"_ _e\"></span>goes bankrupt, 50Hertz Tran<span class=\"_ _2\"></span>smission is compensated by the reg<span class=\"_ _e\"></span>ulator for the loss incurred. The group<span class=\"_ _2\"></span> believes that the unimpaired amounts overdue by more than 30 <span class=\"_ _e\"></span>days are still collectible, based on historical payment behaviour and extensive an<span class=\"_ _2\"></span>alysis of customer credit risk, including customers' underlying credit ratings, when available. The<span class=\"_ _e\"></span> credit quality of trade<span class=\"_ _2\"></span> and other receivables is assessed based on a credit policy.<span class=\"_ _e\"></span> IFRS 9 requires <span class=\"_ _2\"></span>the group to impair financial assets based on a forward-looki<span class=\"_ _e\"></span>ng expected credit loss (ECL) approach. <span class=\"ff45\"> </span>As of 2022<span class=\"_ _2\"></span>, the group applies an individualized approach for trade receivables, for w<span class=\"_ _e\"></span>hich the Group has set ru<span class=\"_ _2\"></span>les fo<span class=\"_ _e\"></span>r defining the s<span class=\"_ _2\"></span>tage of the concer<span class=\"_ _2\"></span>ned asset for Expected Credit Loss (ECL) ca<span class=\"_ _e\"></span>lculations. \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">sta<span class=\"_ _2\"></span>ge 1<span class=\"ff3f\"> covers financial assets that have not deteriorated significantly since initial recognition. The ECL for<span class=\"_ _2\"></span> stage<span class=\"_ _e\"></span> 1 <span class=\"_ _e\"></span>is calculated </span></span></span>on a 12-month basis, \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">sta<span class=\"_ _2\"></span>ge 2<span class=\"ff3f\"> covers financial assets for which the credit risk has significantly increased. The ECL for stage 2 is calculated on a lifetim<span class=\"_ _e\"></span><span class=\"ls5b\">e </span></span></span></span>basis. The decisio<span class=\"_ _2\"></span>n to move an asset from stage 1 to stage 2 is based on certain cr<span class=\"_ _e\"></span>iteria such as:  o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">a significant downgrade in the creditworthiness of a counterparty and/or its parent company and/or its guara<span class=\"_ _2\"></span>ntor (if <span class=\"_ _e\"></span>any), <span class=\"_ _e\"></span> </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">significant adverse changes in the regulatory environment, </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">changes in political or country-related risks, and  </span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">any other aspect the Group may consider relevant.  </span></span>Regarding fina<span class=\"_ _2\"></span>ncial assets that are more than 30 days past due, the move to stage 2 is not systematically applied as long as t<span class=\"_ _e\"></span>he Group has rea<span class=\"_ _2\"></span>sonable and supporting infor<span class=\"_ _e\"></span>mation that demonstrates that, even if payments become more than 30 days past due, this does not repre<span class=\"_ _2\"></span>sent a significant increase in the credit risk since initial recognition.<span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"ff40 fc3\">sta<span class=\"_ _2\"></span>ge 3<span class=\"ff3f\"> covers assets for which default has already been observed, such as:<span class=\"_ _e\"></span> </span></span></span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">when there is <span class=\"_ _2\"></span>evidence of failure in cre<span class=\"_ _2\"></span>dit support fr<span class=\"_ _2\"></span>om a parent company to<span class=\"_ _2\"></span> its subsidiary (in t<span class=\"_ _2\"></span>his case th<span class=\"_ _2\"></span>e subsidiary is the </span></span>Group\u2019s counterparty at r<span class=\"_ _2\"></span>isk),<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>o<span class=\"ff3f\"> <span class=\"_ _13c\"> </span><span class=\"fc3\">when a Group entity has initiated legal proceedings against the counterparty for non-payment.<span class=\"_ _e\"></span> </span></span>Regarding fina<span class=\"_ _2\"></span>ncial assets that are more than 90 days pa<span class=\"_ _e\"></span>st due, the presumption can be<span class=\"_ _2\"></span> rebutted if the Group has reasonable and suppor<span class=\"_ _2\"></span>table information that demonstrates that even if pa<span class=\"_ _e\"></span>yments become<span class=\"_ _2\"></span> more than 90 days past due, this does not<span class=\"_ _e\"></span> indicate counterparty<span class=\"_ _2\"></span> default.<span class=\"_ _e\"></span> The ECL formula<span class=\"_ _2\"></span> applicable in stages 1 and 2 is ECL = E<span class=\"_ _e\"></span>AD x PD x LGD, where: \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">for 1<span class=\"_ _2\"></span>2-month ECL, Exposure At Default (EAD) equals the carrying<span class=\"_ _2\"></span> amount of the financial asset, to which the relevant Probability </span></span>of Default (PD) an<span class=\"_ _2\"></span>d the Loss Given Default (LGD) are applied<span class=\"_ _e\"></span><span class=\"ls1d\">; <span class=\"_ _e\"></span></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">for life<span class=\"_ _2\"></span>time ECL, the calculation method consists in identifying changes in exposure for each year, especially the expected ti<span class=\"_ _e\"></span>ming </span></span>and amount of th<span class=\"_ _2\"></span>e contractual repayments, and then applying to each repayment the relevant PD and the LGD, and discounting<span class=\"_ _e\"></span> the figures ob<span class=\"_ _2\"></span>tained. ECL is then the sum of the discounted figures; and <span class=\"_ _e\"></span> \u2022<span class=\"ff3f\"> <span class=\"_ _1dc\"> </span><span class=\"fc3\">pro<span class=\"_ _2\"></span>bability of default is the likelihood of default over a particular time horizon (in stage 1, this time horizon is 12 month<span class=\"_ _e\"></span>s after the </span></span>repor<span class=\"_ _2\"></span>ting period; in stage 2 this time horizon is the e<span class=\"_ _e\"></span>ntire lifetime of the financial asset). This informa<span class=\"_ _2\"></span>tion is based on external data from a<span class=\"_ _2\"></span> well-known rating agency. The PD depends on the time horizon and of the rating of the counterparty. <span class=\"_ _e\"></span> The Group uses externa<span class=\"_ _2\"></span>l ratings if they are available; <span class=\"_ _e\"></span>or an internal ra<span class=\"_ _2\"></span>ting for major counterparties with no external <span class=\"_ _e\"></span>rating.  Elia Group d<span class=\"_ _2\"></span>id not see any changes in payment behaviour, nor an increase in bad debtors as a consequence of the crisis in 202<span class=\"_ _e\"></span><span class=\"ls5b\">1 </span>(C<span class=\"ls0\">OVID-<span class=\"ls5b\">19</span>) nor in 2022 (energy crisis) and it does not ex<span class=\"_ _e\"></span>pect any major impact related to the pandemic to arise in the coming years.<span class=\"_ _e\"></span> </span>Subsequently, a loss <span class=\"_ _2\"></span>given default is calculated as the percentage of the amount of trade receivables that is not covered b<span class=\"_ _2\"></span>y <span class=\"_ _e\"></span>a ba<span class=\"_ _e\"></span>nk guarantee.<span class=\"_ _2\"></span> <span class=\"ff42\">The total outstanding amount of trade receivables covered by a bank guarantee totals \u20ac97.1 million. The loss given default<span class=\"_ _e\"></span></span> is multiplied b<span class=\"_ _2\"></span>y the outstanding trade receivables.<span class=\"_ _e\"></span> This approa<span class=\"_ _2\"></span>ch is deemed more relevant than the portfolio approach to provid<span class=\"_ _e\"></span>e a better assessment of the risk, especially in the current context o<span class=\"_ _2\"></span>f volatile market conditions. The impact of this new approach is not significant. Furthermore, any <span class=\"_ _e\"></span>losses would be recoverable through the<span class=\"_ _2\"></span> tariffs. <span class=\"_ _e\"></span> The model is applied to the<span class=\"_ _2\"></span> trade receivables, all other fin<span class=\"_ _e\"></span>ancial assets<span class=\"_ _2\"></span> being not assessed at risk of impairment co<span class=\"_ _e\"></span>nsidering<span class=\"_ _2\"></span> their nature (regu<span class=\"_ _2\"></span>latory assets, amounts recoverable through future tariffs in compliance with the regulatory frameworks), risk profile (reliable counterparty<span class=\"_ _2\"></span> being for the levies the Belgian/German stat<span class=\"_ _e\"></span>e) or measurement metho<span class=\"_ _2\"></span>d (at fair value). More details are provided in the different note<span class=\"_ _2\"></span>s.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCreditRiskExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__128": {
   "value": "MARKET RISK The market risk take<span class=\"_ _2\"></span>s into account negative effects on the financial positi<span class=\"_ _e\"></span>on and cash flows of the group arising as a result of price changes on the market which cannot be otherwise avoided. The activities o<span class=\"_ _2\"></span>f the grou<span class=\"_ _e\"></span>p extend to the ele<span class=\"_ _2\"></span>ctricity mark<span class=\"_ _e\"></span>et <span class=\"ff42\">\u2013</span> in particular through selling<span class=\"_ _2\"></span> the electricity generated from renewa<span class=\"_ _e\"></span>ble energy as well as the procurement of energy to cover grid energ<span class=\"_ _2\"></span>y losses <span class=\"ff42\">\u2013</span> <span class=\"_ _e\"></span>as well as to th<span class=\"_ _2\"></span>e market for short-term deposits. In Germany, t<span class=\"ls5b\">he </span>gr<span class=\"_ _e\"></span>oup counteracts the procurement price risk for grid loss energy by hedging<span class=\"_ _2\"></span> prices at an early stage using futures contracts on the EEX electricity exchange<span class=\"_ _20\"></span> Foreign curren<span class=\"_ _e\"></span>cy risk<span class=\"_ _2\"></span> <span class=\"_ _251\"> </span> The group<span class=\"_ _2\"></span> is not exposed to any significant currency risk, <span class=\"_ _e\"></span>either from transa<span class=\"_ _2\"></span>ctions or from exchanging foreign currencies into euro, si<span class=\"_ _e\"></span>nce it has no material foreign investments or activities and less than 1<span class=\"_ _2\"></span>% of its costs are expressed in currencies other than euro<span class=\"_ _e\"></span>s. Inter<span class=\"_ _e\"></span>est rate risk<span class=\"_ _2\"></span> Intere<span class=\"_ _2\"></span>st rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of c<span class=\"_ _e\"></span>hanges in market interest rate<span class=\"_ _2\"></span>s. The Group's exposure to the risk of changes in market interest rates relates prima<span class=\"_ _e\"></span>rily to its long-term debt obligations with floating interest<span class=\"_ _2\"></span> rates. As at 31 December 2022, 5 interest<span class=\"_ _e\"></span>-rate swaps were outstanding in connection with pre-hedgi<span class=\"_ _e\"></span>ng of probable forecasted debt transactions. T<span class=\"_ _2\"></span>he interest rate swaps on the other loan and the loan with Publi-Part to cover a nominal debt amount of \u20ac300 m<span class=\"_ _2\"></span>illion were settled in June 2020, together with the repayment of the loans. <span class=\"_ _e\"></span><span class=\"ff3f\"> </span>See Note 6.13 for a summa<span class=\"_ _2\"></span>ry of the outstanding loans an<span class=\"_ _e\"></span>d their respective interest rates.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfMarketRiskExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__132": {
   "value": "LIQUIDITY RISK Liquidity r<span class=\"_ _2\"></span>isk is the risk that the group <span class=\"_ _e\"></span>may be unable to meet its financial obligations. The group limits this risk by constantly monitoring cash flows and en<span class=\"_ _2\"></span>suring that there are always sufficient credit<span class=\"_ _e\"></span>-line facilities available. The <span class=\"ff42\">group<span class=\"_ _2\"></span>\u2019s <span class=\"ff3f\">objective is to maintain a balance between continuity of<span class=\"_ _e\"></span> funding and flexibility through the use of bank loans, co<span class=\"_ _2\"></span>nfirmed and </span></span>unconfirmed credit facilities, commer<span class=\"_ _2\"></span>cial paper program<span class=\"ls57\">me</span>s, etc. For medium- to long-term funding, the group uses bonds. The maturity profile o<span class=\"_ _2\"></span>f the debt portfolio is spread over several ye<span class=\"_ _e\"></span>ars. The Group Treasury frequently assesses its funding resources taking in<span class=\"_ _2\"></span>to account its own credit ra<span class=\"_ _2\"></span>ting and general market conditions.<span class=\"_ _e\"></span> Bond issuance<span class=\"_ _2\"></span>s realised ove<span class=\"_ _e\"></span>r the last years and loan contracts signed with EIB and other banks prove that the group has access to different sour<span class=\"_ _2\"></span>ces of funding.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Expected Closing 6-<span class=\"ls5b\">12 </span>1-<span class=\"ls5b\">2 </span>2-<span class=\"ls5b\">5 </span>&gt; 5 Face value cash 6 months balance months years years years outflows Non-derivat<span class=\"_ _2\"></span>ive financial liabilities 11,546<span class=\"_ _2\"></span>.5 <span class=\"_ _e\"></span> 11,513<span class=\"_ _2\"></span>.3 <span class=\"_ _e\"></span> (12,352.6) (3,878.3) (25.6) (897.5) (2,128.6) (5,422.6) Unsecured bond issues 7,281.7  7,248.5  (8,124.1) (103.6) (23.6) (877.1) (1,820.6) (5,299.2) Unsecured finan<span class=\"_ _2\"></span>cial bank loans and interest accruals 568.4  568.4  (532.1) (78.4) (2.0) (20.4) (308.0) (123.4) Trade and<span class=\"_ _2\"></span> other payables<span class=\"_ _e\"></span> 3,696.4  3,696.4  (3,696.4) (3,696.4) 0.0  0.0  0.0  0.0  Total at<span class=\"_ _2\"></span> 31 December 2021<span class=\"ls0\"> </span>11,546<span class=\"_ _2\"></span>.5 <span class=\"_ _e\"></span> 11,513<span class=\"_ _2\"></span>.3 <span class=\"_ _e\"></span> (12,352.6) (3,878.3) (25.6) (897.5) (2,128.6) (5,422.6) (in \u20ac million)<span class=\"ff40\"> </span>Expected Closing 6-<span class=\"ls5b\">12 </span>1-<span class=\"ls5b\">2 </span>2-<span class=\"ls5b\">5 </span>&gt; 5 Face value cash 6 months balance months years years years outflows Non-derivat<span class=\"_ _2\"></span>ive financial liabilities 13,327<span class=\"_ _2\"></span>.1 <span class=\"_ _e\"></span> 13,296<span class=\"_ _2\"></span>.7 <span class=\"_ _e\"></span> (14,979.8) (4,925.7) (800.5) (659.5) (1,923.7) (6,670.4) Unsecured bond issues 7,273.3  7,243.0  (8,972.9) (103.5) (798.2) (639.3) (1,620.9) (5,811.0) Unsecured finan<span class=\"_ _2\"></span>cial bank loans and interest accruals 1,249.6  1,249.6  (1,202.7) (18.1) (2.3) (20.2) (302.8) (859.4) Trade and<span class=\"_ _2\"></span> other payables<span class=\"_ _e\"></span> 4,804.2  4,804.2  (4,804.2) (4,804.2) 0.0  0.0  0.0  0.0  Total at<span class=\"_ _2\"></span> 31 December 2022<span class=\"ls0\"> </span>13,327<span class=\"_ _2\"></span>.1 <span class=\"_ _e\"></span> 13,296<span class=\"_ _2\"></span>.7 <span class=\"_ _e\"></span> (14,979.8) (4,925.7) (800.5) (659.5) (1,923.7) (6,670.4) Details of th<span class=\"_ _2\"></span>e used and unused back-<span class=\"_ _e\"></span>up credit facilities are set out below: Availab<span class=\"_ _2\"></span>le Average basic<span class=\"_ _2\"></span> Amount Amount not<span class=\"_ _2\"></span> (in \u20ac million)<span class=\"ff40\"> </span>Matu<span class=\"_ _2\"></span>rity<span class=\"_ _e\"></span> amount interest used used Sustainable Re<span class=\"_ _2\"></span>volving Credit Facility<span class=\"_ _e\"></span> 10/12/2025 650.0  Euribor + 0.325%  0.0  650.0  Confirmed cred<span class=\"_ _2\"></span>it line<span class=\"_ _e\"></span> 2/26/2025 750.0  Euribor + 0,275% 0.0  750.0  Confirmed cred<span class=\"_ _2\"></span>it line<span class=\"_ _e\"></span> 12/14/2026 150.0  Euribor + 0,275% 150.0  0.0  Straight L<span class=\"_ _2\"></span>oan EGI<span class=\"_ _e\"></span> unlimited 2.5  Euribor + 0.75<span class=\"_ _2\"></span>%<span class=\"_ _e\"></span> 0.0  2.5  Confirmed cred<span class=\"_ _2\"></span>it line<span class=\"_ _e\"></span> unlimited 35.0  Eurribor<span class=\"_ _2\"></span> + 0.2%<span class=\"_ _e\"></span> 0.0  35.0  av. 1M-<span class=\"_ _2\"></span>Euribor Confirmed cred<span class=\"_ _2\"></span>it line<span class=\"_ _e\"></span> unlimited 150.0  0.0  150.0  +0.275<span class=\"_ _2\"></span>%<span class=\"_ _e\"></span> Total 1,737.5  150.0  1,587.5  Since 2020, <span class=\"_ _2\"></span>the group has had several lines available to guarantee the financing of its activities and to cushion possible va<span class=\"_ _e\"></span>riations in levies (even if we can observe a<span class=\"_ _2\"></span> surplus for the last 2 years) or derivatives. Indeed, the hi<span class=\"_ _e\"></span>gh volume of futures contracts contracted by 50Hertz Tran<span class=\"_ _2\"></span>smission (Germany) also has an impact on t<span class=\"_ _e\"></span>he Group's liquidity management. The daily ca<span class=\"_ _2\"></span>sh settlem<span class=\"_ _e\"></span>ent of future<span class=\"_ _2\"></span>s contract<span class=\"_ _2\"></span>s with the exchange can have short<span class=\"_ _e\"></span>-term effects on liquidity, which largely follow the general price trend on the electricity market.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfLiquidityRiskExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__127": {
   "value": "CAPITAL RISK <span class=\"_ _e\"></span>MANAGEMENT The purpo<span class=\"_ _2\"></span>se of the group's capital-structure management<span class=\"_ _e\"></span> is to ensure that the debt and equity ratios related to its regulated activities are as <span class=\"_ _2\"></span>closely aligned as possible with t<span class=\"_ _e\"></span>he recommended level set by the relevant regulatory frameworks.   The Company's d<span class=\"_ _2\"></span>ividend guidelines involve optimising dividend payments while bearing in mind that self<span class=\"_ _e\"></span>-financing capacity is needed to carry out its leg<span class=\"_ _2\"></span>al mission as transmission system operato<span class=\"_ _e\"></span>r, finan<span class=\"_ _2\"></span>ce future CAPEX projects and,<span class=\"_ _e\"></span> more generally, implement the g<span class=\"ff42\">roup\u2019s </span>strateg<span class=\"_ _2\"></span>y. The Company offer<span class=\"_ _2\"></span>s its employees the opportunity to sub<span class=\"_ _e\"></span>scribe to capital increases <span class=\"_ _2\"></span>that are exclusively reserved fo<span class=\"_ _e\"></span>r them<span class=\"_ _2\"></span>.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfObjectivesPoliciesAndProcessesForManagingCapitalExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__134": {
   "value": "8.2. <span class=\"_ _87\"> </span>Commitments and contingencies CAPITAL-EXPENDITURE COMMITMENT As at 31 December<span class=\"_ _2\"></span> 2022, the group ha<span class=\"_ _e\"></span>d a commitment of <span class=\"ff42\">\u20ac</span>3,<span class=\"ls5b\">883</span>.9 million (<span class=\"ff42\">\u20ac</span>2,068.4 million in 2021) relating to purchase contracts for the installa<span class=\"_ _2\"></span>tion of property, plant and equipment for further grid extensions.<span class=\"_ _e\"></span>  OTHER C<span class=\"_ _e\"></span>ON<span class=\"_ _2\"></span>TINGENCIES AND COMMITMENTS As at 31 December<span class=\"_ _2\"></span> 2022, the group <span class=\"ls5b\">ha<span class=\"_ _e\"></span></span>d a commitment of <span class=\"ff42\">\u20ac</span><span class=\"ls5b\">347</span>.9 million (<span class=\"ff42\">\u20ac</span>263.5 million in 2021) r<span class=\"_ _e\"></span>elating to purchase contracts for general expenses, maintenance and repa<span class=\"_ _2\"></span>ir costs.<span class=\"_ _e\"></span> Having rece<span class=\"_ _2\"></span>ived approval from the Walloon government a<span class=\"_ _e\"></span>nd from the<span class=\"_ _2\"></span> CREG, on 22 June 2015 E<span class=\"_ _e\"></span>lia entered into an agreement with Solar Chest f<span class=\"_ _2\"></span>or the sale of Walloon green certificates with a total value of \u20ac275 million. Solar Chest's mission is to buy, h<span class=\"ff3f\">old a<span class=\"_ _e\"></span>nd sell </span>Walloon gr<span class=\"_ _2\"></span>een certificates for periods of five, six and seven years. In accordance<span class=\"_ _e\"></span> with legislation, Solar Chest conducted several auctions.  Since June 2015, <span class=\"_ _2\"></span>Elia has been obliged to buy back from S<span class=\"_ _e\"></span>olar Chest t<span class=\"_ _2\"></span>he green certificates that the latter could not sell on <span class=\"_ _e\"></span>the mark<span class=\"_ _e\"></span>et in due time. At the<span class=\"_ _2\"></span> auction it organized in February 2022, So<span class=\"_ _e\"></span>lar Chest sold all the green certificates it st<span class=\"_ _2\"></span>ill held at that time to the market. In September 2022, Solar<span class=\"_ _2\"></span> Chest's activities were terminated and it was dissolved. The aforementioned obligation to buy back the certificates <span class=\"_ _2\"></span>from Elia has therefore not been ap<span class=\"_ _e\"></span>plied in any concrete case and is no longer applicable. In September 2017<span class=\"_ _2\"></span>, Elia sold 2.8 million green certificates to the Walloon Region (i.e. the Walloon Agency for Air and Climat<span class=\"_ _e\"></span>e, or AwA<span class=\"_ _e\"></span>C) leading t<span class=\"_ _2\"></span>o a net cash inflow of \u20ac181.2 million. This <span class=\"ff3f\">was a r<span class=\"_ _e\"></span>esult of the Decree of 29 June 2017 amending the Decree of 12 April 2011 </span>relating to the<span class=\"_ _2\"></span> organisation of the regional electricity market and the Decree of 5 March 2008 relating to the creation of th<span class=\"_ _e\"></span>e Walloon Agency for Air<span class=\"_ _2\"></span> and Climate. The green certificates transfe<span class=\"_ _e\"></span>rred b<span class=\"_ _2\"></span>y El<span class=\"_ _e\"></span>ia can be gradually resold b<span class=\"_ _2\"></span>y the AwAC from 2022 onwards, taking into account the mar<span class=\"_ _2\"></span>ket conditions that exist for green certificates at that time. The legislation also envisages the green c<span class=\"_ _e\"></span>ertificates being held by the AwAC for a period of up to n<span class=\"_ _2\"></span>ine years, after w<span class=\"_ _e\"></span>hich Elia is requ<span class=\"_ _2\"></span>ired to buy back any unsold certificates. These repurchase commitments will have<span class=\"_ _2\"></span> no impact on Elia's financial performance, as the cost and expense for the repurchase will be fully recov<span class=\"_ _e\"></span>ered through the<span class=\"_ _2\"></span> tariffs for levies. The legislation was supplemented in 2021 by new provisions that allow the Government to decide, after consultation with th<span class=\"_ _2\"></span>e LTSO, on the gradual resale to Elia of certain quantities of green certificates held by AwAC.<span class=\"_ _e\"></span> In November 2018, <span class=\"ff42\">Elia so<span class=\"_ _2\"></span>ld another \u20ac0.7 million in green certificates to the Walloon Region (i.e. the AwAC) which resulted in a net </span>cash inflow of \u20ac43.3 million. <span class=\"_ _2\"></span>As with the transaction in September 2017, Elia might be required to buy back some of the certi<span class=\"_ _e\"></span><span class=\"ff3f\">ficates sold </span>fr<span class=\"ls0\">om 2023 onwards. Any repurchase will be co<span class=\"_ _2\"></span>vered throu<span class=\"_ _e\"></span>gh the tariffs for levie<span class=\"_ _2\"></span>s. There were no transactions for sale of green </span>certificates <span class=\"_ _2\"></span>to the AwAC in 2019, 2020, 2021 or 2022. C<span class=\"_ _e\"></span>onsidering (i) the state of the Walloon green certificate market and (ii) th<span class=\"ls78\">e </span>amoun<span class=\"_ _2\"></span>ts actually available following the application of the surcharge in 2022, the Walloon Government has decided to ask Elia<span class=\"_ _e\"></span> to buy back certif<span class=\"_ _2\"></span>icates held by AwAC for an amount of \u20ac45.5 million.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>In Germany, offshore expenses between 50Hertz and TenneT<span class=\"_ _2\"></span> <span class=\"_ _e\"></span>TSO arising from the horizontal sett<span class=\"_ _2\"></span>lement <span class=\"_ _e\"></span>has given rise to financial obligation<span class=\"_ _2\"></span>s for 50Hertz in future periods. The total amount<span class=\"_ _e\"></span> of these future <span class=\"ff42\">cumulative amounts comes to \u20ac</span>0.3 million<span class=\"_ _e\"></span> (prior yea<span class=\"ff42\">r: \u20ac</span>3.9 million<span class=\"ff42\">) and will be r<span class=\"_ _2\"></span>eflected in 50Hertz\u2019s networ<span class=\"ff3f\">k use<span class=\"_ _e\"></span>r charge calculations over the coming years following the corresponding billing b<span class=\"_ _2\"></span>y </span></span>TenneT T<span class=\"_ _2\"></span>SO.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCommitmentsExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__133": {
   "value": "8.2. <span class=\"_ _87\"> </span>Commitments and contingencies CAPITAL-EXPENDITURE COMMITMENT As at 31 December<span class=\"_ _2\"></span> 2022, the group ha<span class=\"_ _e\"></span>d a commitment of <span class=\"ff42\">\u20ac</span>3,<span class=\"ls5b\">883</span>.9 million (<span class=\"ff42\">\u20ac</span>2,068.4 million in 2021) relating to purchase contracts for the installa<span class=\"_ _2\"></span>tion of property, plant and equipment for further grid extensions.<span class=\"_ _e\"></span>  OTHER C<span class=\"_ _e\"></span>ON<span class=\"_ _2\"></span>TINGENCIES AND COMMITMENTS As at 31 December<span class=\"_ _2\"></span> 2022, the group <span class=\"ls5b\">ha<span class=\"_ _e\"></span></span>d a commitment of <span class=\"ff42\">\u20ac</span><span class=\"ls5b\">347</span>.9 million (<span class=\"ff42\">\u20ac</span>263.5 million in 2021) r<span class=\"_ _e\"></span>elating to purchase contracts for general expenses, maintenance and repa<span class=\"_ _2\"></span>ir costs.<span class=\"_ _e\"></span> Having rece<span class=\"_ _2\"></span>ived approval from the Walloon government a<span class=\"_ _e\"></span>nd from the<span class=\"_ _2\"></span> CREG, on 22 June 2015 E<span class=\"_ _e\"></span>lia entered into an agreement with Solar Chest f<span class=\"_ _2\"></span>or the sale of Walloon green certificates with a total value of \u20ac275 million. Solar Chest's mission is to buy, h<span class=\"ff3f\">old a<span class=\"_ _e\"></span>nd sell </span>Walloon gr<span class=\"_ _2\"></span>een certificates for periods of five, six and seven years. In accordance<span class=\"_ _e\"></span> with legislation, Solar Chest conducted several auctions.  Since June 2015, <span class=\"_ _2\"></span>Elia has been obliged to buy back from S<span class=\"_ _e\"></span>olar Chest t<span class=\"_ _2\"></span>he green certificates that the latter could not sell on <span class=\"_ _e\"></span>the mark<span class=\"_ _e\"></span>et in due time. At the<span class=\"_ _2\"></span> auction it organized in February 2022, So<span class=\"_ _e\"></span>lar Chest sold all the green certificates it st<span class=\"_ _2\"></span>ill held at that time to the market. In September 2022, Solar<span class=\"_ _2\"></span> Chest's activities were terminated and it was dissolved. The aforementioned obligation to buy back the certificates <span class=\"_ _2\"></span>from Elia has therefore not been ap<span class=\"_ _e\"></span>plied in any concrete case and is no longer applicable. In September 2017<span class=\"_ _2\"></span>, Elia sold 2.8 million green certificates to the Walloon Region (i.e. the Walloon Agency for Air and Climat<span class=\"_ _e\"></span>e, or AwA<span class=\"_ _e\"></span>C) leading t<span class=\"_ _2\"></span>o a net cash inflow of \u20ac181.2 million. This <span class=\"ff3f\">was a r<span class=\"_ _e\"></span>esult of the Decree of 29 June 2017 amending the Decree of 12 April 2011 </span>relating to the<span class=\"_ _2\"></span> organisation of the regional electricity market and the Decree of 5 March 2008 relating to the creation of th<span class=\"_ _e\"></span>e Walloon Agency for Air<span class=\"_ _2\"></span> and Climate. The green certificates transfe<span class=\"_ _e\"></span>rred b<span class=\"_ _2\"></span>y El<span class=\"_ _e\"></span>ia can be gradually resold b<span class=\"_ _2\"></span>y the AwAC from 2022 onwards, taking into account the mar<span class=\"_ _2\"></span>ket conditions that exist for green certificates at that time. The legislation also envisages the green c<span class=\"_ _e\"></span>ertificates being held by the AwAC for a period of up to n<span class=\"_ _2\"></span>ine years, after w<span class=\"_ _e\"></span>hich Elia is requ<span class=\"_ _2\"></span>ired to buy back any unsold certificates. These repurchase commitments will have<span class=\"_ _2\"></span> no impact on Elia's financial performance, as the cost and expense for the repurchase will be fully recov<span class=\"_ _e\"></span>ered through the<span class=\"_ _2\"></span> tariffs for levies. The legislation was supplemented in 2021 by new provisions that allow the Government to decide, after consultation with th<span class=\"_ _2\"></span>e LTSO, on the gradual resale to Elia of certain quantities of green certificates held by AwAC.<span class=\"_ _e\"></span> In November 2018, <span class=\"ff42\">Elia so<span class=\"_ _2\"></span>ld another \u20ac0.7 million in green certificates to the Walloon Region (i.e. the AwAC) which resulted in a net </span>cash inflow of \u20ac43.3 million. <span class=\"_ _2\"></span>As with the transaction in September 2017, Elia might be required to buy back some of the certi<span class=\"_ _e\"></span><span class=\"ff3f\">ficates sold </span>fr<span class=\"ls0\">om 2023 onwards. Any repurchase will be co<span class=\"_ _2\"></span>vered throu<span class=\"_ _e\"></span>gh the tariffs for levie<span class=\"_ _2\"></span>s. There were no transactions for sale of green </span>certificates <span class=\"_ _2\"></span>to the AwAC in 2019, 2020, 2021 or 2022. C<span class=\"_ _e\"></span>onsidering (i) the state of the Walloon green certificate market and (ii) th<span class=\"ls78\">e </span>amoun<span class=\"_ _2\"></span>ts actually available following the application of the surcharge in 2022, the Walloon Government has decided to ask Elia<span class=\"_ _e\"></span> to buy back certif<span class=\"_ _2\"></span>icates held by AwAC for an amount of \u20ac45.5 million.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>In Germany, offshore expenses between 50Hertz and TenneT<span class=\"_ _2\"></span> <span class=\"_ _e\"></span>TSO arising from the horizontal sett<span class=\"_ _2\"></span>lement <span class=\"_ _e\"></span>has given rise to financial obligation<span class=\"_ _2\"></span>s for 50Hertz in future periods. The total amount<span class=\"_ _e\"></span> of these future <span class=\"ff42\">cumulative amounts comes to \u20ac</span>0.3 million<span class=\"_ _e\"></span> (prior yea<span class=\"ff42\">r: \u20ac</span>3.9 million<span class=\"ff42\">) and will be r<span class=\"_ _2\"></span>eflected in 50Hertz\u2019s networ<span class=\"ff3f\">k use<span class=\"_ _e\"></span>r charge calculations over the coming years following the corresponding billing b<span class=\"_ _2\"></span>y </span></span>TenneT T<span class=\"_ _2\"></span>SO.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCommitmentsAndContingentLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__136": {
   "value": "8.3. <span class=\"_ _87\"> </span>Related parties CONTROLLING ENTITIES The <span class=\"_ _20\"></span>core <span class=\"_ _5d\"></span>shareholder <span class=\"_ _20\"></span>of <span class=\"_ _5d\"></span>Elia <span class=\"_ _5d\"></span>Group <span class=\"_ _20\"></span>is <span class=\"_ _5d\"></span>Publi-T <span class=\"_ _5d\"></span>and <span class=\"_ _5d\"></span>this <span class=\"_ _5d\"></span>rem<span class=\"_ _2\"></span>ained <span class=\"_ _5d\"></span>unchanged <span class=\"_ _20\"></span>from <span class=\"_ _5d\"></span>2021. <span class=\"_ _5d\"></span>Other <span class=\"_ _20\"></span>th<span class=\"_ _e\"></span>an <span class=\"_ _20\"></span>the <span class=\"_ _5d\"></span>yearly <span class=\"_ _5d\"></span>dividend <span class=\"_ _20\"></span>payment, <span class=\"_ _5d\"></span>no<span class=\"_ _e\"></span> transact<span class=\"_ _2\"></span>ions occurred with the core shareholder in 2022.<span class=\"_ _e\"></span> The shareholder<span class=\"_ _2\"></span> structure of the group can be fo<span class=\"_ _e\"></span>und in Note 7. TRANSACTIONS WITH KEY MANAGEM<span class=\"_ _2\"></span>ENT PER<span class=\"_ _e\"></span>SONNEL Key <span class=\"_ _24d\"> </span>management <span class=\"_ _24d\"> </span>personnel <span class=\"_ _24d\"> </span>include <span class=\"_ _24d\"> </span>E<span class=\"_ _e\"></span>lia's <span class=\"_ _24d\"> </span>Board <span class=\"_ _57\"> </span>of <span class=\"_ _24d\"> </span>Directors <span class=\"_ _24d\"> </span>and <span class=\"_ _24d\"> </span>Elia\u2019s <span class=\"_ _57\"> </span>Management <span class=\"_ _24d\"> </span>Committee, <span class=\"_ _57\"> </span>both <span class=\"_ _24d\"> </span>of <span class=\"_ _24d\"> </span>whi<span class=\"_ _e\"></span>ch <span class=\"_ _24d\"> </span>have <span class=\"_ _24d\"> </span>a <span class=\"_ _24d\"> </span>significa<span class=\"_ _e\"></span>nt influence a<span class=\"_ _2\"></span>cross the entire Elia Group. <span class=\"_ _e\"></span> At <span class=\"_ _20\"></span>50Hertz <span class=\"_ _20\"></span>Tr<span class=\"_ _e\"></span>ansmission <span class=\"_ _20\"></span>(Germany), <span class=\"_ _5d\"></span>key <span class=\"_ _20\"></span>management <span class=\"_ _5d\"></span>personnel <span class=\"_ _20\"></span>include <span class=\"_ _20\"></span>Eur<span class=\"_ _e\"></span>ogrid <span class=\"_ _20\"></span>Internationa<span class=\"_ _e\"></span><span class=\"ls1c\">l <span class=\"_ _20\"></span></span>S<span class=\"_ _e\"></span>A/NV<span class=\"ff42\">\u2019s <span class=\"_ _5d\"> </span>Board <span class=\"_ _5d\"> </span>of <span class=\"_ _20\"></span>Directors, <span class=\"_ _20\"></span>who <span class=\"_ _5d\"></span>are </span>respon<span class=\"_ _2\"></span>sible <span class=\"_ _24d\"> </span>for <span class=\"_ _5d\"> </span>monitoring <span class=\"_ _24d\"> </span>the <span class=\"_ _24d\"> </span>activities <span class=\"_ _5d\"></span>of <span class=\"_ _24d\"> </span>50Hertz <span class=\"_ _5d\"> </span>T<span class=\"_ _e\"></span>ransmission <span class=\"_ _5d\"></span>(Germany). <span class=\"_ _5d\"></span>Key <span class=\"_ _57\"> </span>management <span class=\"_ _5d\"></span>personnel <span class=\"_ _5d\"> </span>also<span class=\"_ _e\"></span> <span class=\"_ _5d\"> </span>include <span class=\"_ _5d\"> </span>th<span class=\"_ _e\"></span>e <span class=\"_ _5d\"></span>Boar<span class=\"_ _e\"></span>d <span class=\"_ _57\"> </span>of<span class=\"_ _e\"></span> Managemen<span class=\"_ _2\"></span>t of 50Hertz Transmission and the Superviso<span class=\"_ _e\"></span>ry Board, <span class=\"_ _2\"></span>which was established in the <span class=\"_ _e\"></span>German segment. <span class=\"_ _e\"></span> The <span class=\"_ _4b\"></span>me<span class=\"_ _e\"></span>mbers of <span class=\"_ _4b\"></span>Elia\u2019s Board <span class=\"_ _4b\"></span>of Dire<span class=\"ff3f\">ctors a<span class=\"_ _2\"></span>re not <span class=\"_ _4b\"></span>e<span class=\"_ _e\"></span>mployees o<span class=\"_ _2\"></span>f <span class=\"_ _2\"></span>the <span class=\"_ _2\"></span>group. The<span class=\"_ _2\"></span> remunera<span class=\"_ _2\"></span>tion for<span class=\"_ _2\"></span> their <span class=\"_ _4b\"></span>ma<span class=\"_ _e\"></span>ndate <span class=\"_ _4b\"></span>i<span class=\"_ _e\"></span>s detailed <span class=\"_ _2\"></span>in <span class=\"_ _2\"></span>the <span class=\"_ _2\"></span>Corporate </span>Governance <span class=\"_ _20\"></span>Statement, <span class=\"_ _20\"></span>w<span class=\"_ _e\"></span>hich <span class=\"_ _20\"></span>f<span class=\"_ _e\"></span>orms <span class=\"_ _20\"></span>part <span class=\"_ _5d\"></span>of <span class=\"_ _20\"></span>this<span class=\"_ _e\"></span> <span class=\"_ _20\"></span>Annual <span class=\"_ _5d\"></span>Report <span class=\"_ _5d\"></span>(see <span class=\"_ _5d\"></span>the <span class=\"_ _20\"></span>remuneration <span class=\"_ _20\"></span>re<span class=\"_ _e\"></span>port).The <span class=\"_ _5d\"></span>members <span class=\"_ _20\"></span>of <span class=\"_ _5d\"></span>Eurogrid <span class=\"_ _20\"></span>Internationa<span class=\"_ _e\"></span>l SA/NV<span class=\"ff42\">\u2019s Board of Director<span class=\"_ _2\"></span>s are not remunerated.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span></span>The o<span class=\"_ _2\"></span>ther members of key management personnel are hired as employees. The components of their remuneration are detailed below<span class=\"_ _e\"></span> (i.e. exclud<span class=\"_ _2\"></span>ing the directors who are not employees)<span class=\"ls1d\">. <span class=\"_ _e\"></span></span> The names of the<span class=\"_ _2\"></span> key management staff are included in the Corporate Governance report.<span class=\"_ _e\"></span> Key management per<span class=\"_ _2\"></span>sonnel did not receive stock options, special loans or other advances from the group throughout the year.<span class=\"_ _e\"></span> (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Short-te<span class=\"_ _2\"></span>rm employee benefits<span class=\"_ _e\"></span> 4.0 2.5 Basic remuneration 2.6 1.7 Variable r<span class=\"_ _2\"></span>emuneration<span class=\"_ _e\"></span> 1.4 0.8 Long-term employe<span class=\"_ _2\"></span>e benefits<span class=\"_ _e\"></span> 0.6 0.5 Post-emp<span class=\"_ _2\"></span>loyment benefits<span class=\"_ _e\"></span> 0.6 0.4 Other va<span class=\"_ _2\"></span>riable remuneration<span class=\"_ _e\"></span> 0.3 0.2 Total gross remune<span class=\"_ _2\"></span>ration 5.5 3.5 Number<span class=\"_ _2\"></span> of persons (in units)<span class=\"_ _e\"></span> 7 5 Average gross remunera<span class=\"_ _2\"></span>tion per person<span class=\"_ _e\"></span> 0.7 0.7 Number of shares<span class=\"_ _2\"></span> (in units) held as at 31 December 2022<span class=\"_ _e\"></span> 8,548  7,849  TRANSACTIONS WITH JOINT VENTURES AND A<span class=\"_ _2\"></span>SSOCIATES<span class=\"_ _e\"></span> Transa<span class=\"_ _2\"></span>ctions between the Company and subsidiaries that are related parties were eliminated during consolidation and therefore<span class=\"_ _e\"></span> are not recogn<span class=\"_ _2\"></span>ised in this note.  Transa<span class=\"_ _2\"></span>ctions with joint ventures and associates <span class=\"_ _e\"></span>(as defined in Note 7.1.) were not eliminated, so details of these transactions are shown below: (in \u20ac million)<span class=\"ff40\"> </span>2022<span class=\"ls0\"> </span>2021<span class=\"ls0\"> </span>Transactions with joint vent<span class=\"_ _2\"></span>ures and associates (4.0) (4.5) Sales of goods 1.6  0.1  Purchases o<span class=\"_ _2\"></span>f goods<span class=\"_ _e\"></span> (5.6) (4.6) Outstanding ba<span class=\"_ _2\"></span>lances with joint ventures and associates<span class=\"_ _e\"></span> (0.4) (0.9) Trade deb<span class=\"_ _2\"></span>tors<span class=\"_ _e\"></span> (0.4) (0.7) Trade deb<span class=\"_ _2\"></span>ts 0.0  (0.2) In 2021 and<span class=\"_ _2\"></span> 2022, entities of the Elia Group had tra<span class=\"_ _e\"></span>nsactions with Nemo Link Ltd. and Coreso SA/NV. The sale of goods relates to corporate services (<span class=\"_ _2\"></span>SLAs) rendered by Elia to Ne<span class=\"_ _e\"></span>mo Link Ltd an<span class=\"_ _2\"></span>d Coreso SA/NV<span class=\"_ _e\"></span>. Nemo L<span class=\"_ _2\"></span>ink Ltd. also rents a building (Herdersbrug) from Elia Asset SA/NV (see<span class=\"_ _2\"></span> also Note 6.18). Purchases o<span class=\"_ _e\"></span>f goods mostly relates to service<span class=\"_ _2\"></span>s ren<span class=\"_ _e\"></span>dered by Coreso SA/NV to the group. TRANSACTIONS WITH SHAREHOLDERS  There were<span class=\"_ _2\"></span> no transactions with shareholders in 2022, except for the dividend payment. <span class=\"_ _e\"></span><span class=\"ff40 fs11\"> </span>TRANSACTIONS WITH RELATED PARTIES  Elia's <span class=\"_ _5d\"></span>Manage<span class=\"_ _2\"></span>ment <span class=\"_ _5d\"></span>Committee <span class=\"_ _5d\"></span>also <span class=\"_ _5d\"></span>assessed <span class=\"_ _20\"></span>w<span class=\"_ _e\"></span>hether <span class=\"_ _5d\"></span>transactions <span class=\"_ _5d\"></span>occurred <span class=\"_ _5d\"></span>with <span class=\"_ _5d\"></span>entities <span class=\"_ _20\"></span>i<span class=\"_ _e\"></span>n <span class=\"_ _5d\"></span>which <span class=\"_ _5d\"></span>they <span class=\"_ _5d\"></span>or <span class=\"_ _20\"></span>m<span class=\"_ _e\"></span>embers <span class=\"_ _5d\"></span>of <span class=\"_ _5d\"></span>the <span class=\"_ _20\"></span>Bo<span class=\"_ _e\"></span>ard <span class=\"_ _5d\"></span>o<span class=\"_ _20\"></span><span class=\"ls95\">f </span>Directors e<span class=\"_ _2\"></span>xercise a significant influence (e.g. positions as CEO, CFO, vice-chair of the Manageme<span class=\"_ _e\"></span>nt Committee, etc.). <span class=\"_ _e\"></span> There were<span class=\"_ _2\"></span> some significant transactions in 2022 i<span class=\"_ _e\"></span>n which the key management personnel of the group has a significant influence. All these tra<span class=\"ff42\">nsact<span class=\"_ _2\"></span>ions took place in the normal course of Elia\u2019s business activities.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>The total value of realised sales was \u20ac0.5 m<span class=\"_ _2\"></span>illion and </span>related<span class=\"_ _2\"></span> to regulated sales contracts with prices that had been predefined by the regulator. The total value of expenses amoun<span class=\"_ _e\"></span>ted to \u20ac0.3<span class=\"ff3f\"> m<span class=\"_ _2\"></span>illion. As at 31 December 2022, there were no outs<span class=\"_ _e\"></span>tanding trade-receivable positions nor outstanding trade-d<span class=\"_ _e\"></span>ebt positions with </span>related<span class=\"_ _2\"></span> parties.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRelatedPartyExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__138": {
   "value": "TRANSACTIONS WITH RELATED PARTIES  Elia's <span class=\"_ _5d\"></span>Manage<span class=\"_ _2\"></span>ment <span class=\"_ _5d\"></span>Committee <span class=\"_ _5d\"></span>also <span class=\"_ _5d\"></span>assessed <span class=\"_ _20\"></span>w<span class=\"_ _e\"></span>hether <span class=\"_ _5d\"></span>transactions <span class=\"_ _5d\"></span>occurred <span class=\"_ _5d\"></span>with <span class=\"_ _5d\"></span>entities <span class=\"_ _20\"></span>i<span class=\"_ _e\"></span>n <span class=\"_ _5d\"></span>which <span class=\"_ _5d\"></span>they <span class=\"_ _5d\"></span>or <span class=\"_ _20\"></span>m<span class=\"_ _e\"></span>embers <span class=\"_ _5d\"></span>of <span class=\"_ _5d\"></span>the <span class=\"_ _20\"></span>Bo<span class=\"_ _e\"></span>ard <span class=\"_ _5d\"></span>o<span class=\"_ _20\"></span><span class=\"ls95\">f </span>Directors e<span class=\"_ _2\"></span>xercise a significant influence (e.g. positions as CEO, CFO, vice-chair of the Manageme<span class=\"_ _e\"></span>nt Committee, etc.). <span class=\"_ _e\"></span> There were<span class=\"_ _2\"></span> some significant transactions in 2022 i<span class=\"_ _e\"></span>n which the key management personnel of the group has a significant influence. All these tra<span class=\"ff42\">nsact<span class=\"_ _2\"></span>ions took place in the normal course of Elia\u2019s business activities.<span class=\"_ _e\"></span><span class=\"ff3f\"> </span>The total value of realised sales was \u20ac0.5 m<span class=\"_ _2\"></span>illion and </span>related<span class=\"_ _2\"></span> to regulated sales contracts with prices that had been predefined by the regulator. The total value of expenses amoun<span class=\"_ _e\"></span>ted to \u20ac0.3<span class=\"ff3f\"> m<span class=\"_ _2\"></span>illion. As at 31 December 2022, there were no outs<span class=\"_ _e\"></span>tanding trade-receivable positions nor outstanding trade-d<span class=\"_ _e\"></span>ebt positions with </span>related<span class=\"_ _2\"></span> parties.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInformationAboutKeyManagementPersonnelExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__139": {
   "value": "8.4. <span class=\"_ _87\"> </span>Subsequent events No significant <span class=\"_ _2\"></span>events that would result in the financial statements being adjusted <span class=\"_ _e\"></span>occurred after the closing of the financial statements as of 31 December 2022. Elia Group SA/NV (\u201cElia Gr<span class=\"_ _2\"></span>oup\u201d) has successfully placed \u20ac500 million hybrid securities to be admitted to trading on<span class=\"_ _e\"></span><span class=\"ff3f\"> the Luxembourg </span>Stock Exchange's Euro<span class=\"_ _2\"></span> MTF market and to be listed on the Official List of the Luxembourg Stock Exchange.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEventsAfterReportingPeriodExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "s8_notes__5__141": {
   "value": "8.6. <span class=\"_ _87\"> </span>Services provided by the auditors The Genera<span class=\"_ _2\"></span>l Meeting of Shareholders appointed as joint auditors BDO Bedrijfsrevisoren BV<span class=\"_ _e\"></span> (represented by Mr. Felix Fank) and E<span class=\"ls27\">Y </span>Bedrijfsrevisoren BV (represented by Mr. Paul Eelen) for the aud<span class=\"_ _2\"></span>it of the consolidated financial statements of Elia G<span class=\"_ _e\"></span>roup SA/NV and Elia Transmission Belgiu<span class=\"_ _2\"></span>m SA/NV<span class=\"_ _e\"></span> and the audit of the statutory financial statements of Elia Group SA/NV<span class=\"ls1d\">, </span>Elia Transmission Belgium SA/NV, Elia Asset SA<span class=\"_ _e\"></span>/NV, Elia Enginee<span class=\"_ _2\"></span>ring SA/NV, Elia Grid International SA/NV, Eurogrid International SA/NV, Windgrid SA/NV and Re.Alto BV/SRL. BDO Bedrijfsrevisore<span class=\"_ _2\"></span>n BV<span class=\"_ _e\"></span> and EY Bedrijfsrevisoren BV are also the statutory auditors of Core<span class=\"_ _2\"></span>so SA/NV<span class=\"_ _e\"></span>. 50Hertz Tran<span class=\"_ _2\"></span>smission (Germany) appointed BDO AG Wir<span class=\"_ _e\"></span>tschaftspr\u00fcfung<span class=\"_ _2\"></span>sgesellschaft<span class=\"_ _e\"></span> for the audit of the consolidated financial statements of <span class=\"_ _2\"></span>Eurogrid GmbH and the statutory financial statements of Eurogrid GmbH, <span class=\"_ _e\"></span>50Hertz Transmission GmbH, 50Hertz Offshore GmbH and Elia Grid I<span class=\"_ _2\"></span>nternational GmbH.<span class=\"_ _e\"></span> The fo<span class=\"_ _2\"></span>llowing table sets out the fees of the joint auditors and their associate<span class=\"_ _e\"></span>s in connection with services delivered with respect to the financial year 2022: in \u20ac<span class=\"ff40\"> </span>Belgiu<span class=\"_ _2\"></span>m<span class=\"_ _e\"></span> Germany Total Statutory audit and r<span class=\"_ _2\"></span>eview of consolidated and parent company financial statements<span class=\"_ _e\"></span> 397,721  359,360  757,081  Non-aud<span class=\"_ _2\"></span>it services, of which: 559,784  101,185  660,969  Services rela<span class=\"_ _2\"></span>ted to legal and regulatory requirements<span class=\"_ _e\"></span> 134,075  40,840<span class=\"_ _2\"></span>  174,915  Other audit services 356,550  60,345<span class=\"_ _2\"></span>  416,895  Tax ser<span class=\"_ _2\"></span>vices 69,159  69,159<span class=\"_ _2\"></span>  Total 957,505  460,545  1,418,050",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAuditorsRemunerationExplanatory",
    "language": "en",
    "entity": "scheme:549300S1MP1NFDIKT460",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  }
 }
}