529900N8OA1GVSR5R946 2022-09-30 529900N8OA1GVSR5R946 2021-09-30 529900N8OA1GVSR5R946 2020-10-01 2021-09-30 529900N8OA1GVSR5R946 2020-09-30 529900N8OA1GVSR5R946 2020-10-01 2021-09-30 ifrs-full:NoncontrollingInterestsMember 529900N8OA1GVSR5R946 2020-10-01 2021-09-30 ifrs-full:EquityAttributableToOwnersOfParentMember 529900N8OA1GVSR5R946 2021-10-01 2022-09-30 ifrs-full:EquityAttributableToOwnersOfParentMember 529900N8OA1GVSR5R946 2021-10-01 2022-09-30 ifrs-full:NoncontrollingInterestsMember 529900N8OA1GVSR5R946 2021-10-01 2022-09-30 ifrs-full:ReserveOfRemeasurementsOfDefinedBenefitPlansMember 529900N8OA1GVSR5R946 2020-10-01 2021-09-30 ifrs-full:ReserveOfRemeasurementsOfDefinedBenefitPlansMember 529900N8OA1GVSR5R946 2020-10-01 2021-09-30 energieag:ReservesUnderIfrs9Member 529900N8OA1GVSR5R946 2020-10-01 2021-09-30 ifrs-full:OtherReservesMember 529900N8OA1GVSR5R946 2021-10-01 2022-09-30 ifrs-full:OtherReservesMember 529900N8OA1GVSR5R946 2021-10-01 2022-09-30 ifrs-full:RetainedEarningsMember 529900N8OA1GVSR5R946 2021-10-01 2022-09-30 energieag:ReservesUnderIfrs9Member 529900N8OA1GVSR5R946 2021-10-01 2022-09-30 ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember 529900N8OA1GVSR5R946 2020-10-01 2021-09-30 ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember 529900N8OA1GVSR5R946 2020-10-01 2021-09-30 ifrs-full:RetainedEarningsMember 529900N8OA1GVSR5R946 2021-10-01 2022-09-30 ifrs-full:TreasurySharesMember 529900N8OA1GVSR5R946 2020-10-01 2021-09-30 ifrs-full:TreasurySharesMember 529900N8OA1GVSR5R946 2020-10-01 2021-09-30 ifrs-full:AdditionalPaidinCapitalMember 529900N8OA1GVSR5R946 2021-10-01 2022-09-30 ifrs-full:AdditionalPaidinCapitalMember 529900N8OA1GVSR5R946 2021-10-01 2022-09-30 ifrs-full:RevaluationSurplusMember 529900N8OA1GVSR5R946 2021-10-01 2022-09-30 ifrs-full:IssuedCapitalMember 529900N8OA1GVSR5R946 2020-10-01 2021-09-30 ifrs-full:IssuedCapitalMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:NoncontrollingInterestsMember 529900N8OA1GVSR5R946 2022-09-30 ifrs-full:RevaluationSurplusMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:RevaluationSurplusMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:EquityAttributableToOwnersOfParentMember 529900N8OA1GVSR5R946 2022-09-30 ifrs-full:EquityAttributableToOwnersOfParentMember 529900N8OA1GVSR5R946 2022-09-30 ifrs-full:TreasurySharesMember 529900N8OA1GVSR5R946 2022-09-30 ifrs-full:NoncontrollingInterestsMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:TreasurySharesMember 529900N8OA1GVSR5R946 2022-09-30 ifrs-full:ReserveOfRemeasurementsOfDefinedBenefitPlansMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:ReserveOfRemeasurementsOfDefinedBenefitPlansMember 529900N8OA1GVSR5R946 2022-09-30 ifrs-full:IssuedCapitalMember 529900N8OA1GVSR5R946 2021-09-30 energieag:ReservesUnderIfrs9Member 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:IssuedCapitalMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:OtherReservesMember 529900N8OA1GVSR5R946 2022-09-30 ifrs-full:OtherReservesMember 529900N8OA1GVSR5R946 2022-09-30 ifrs-full:RetainedEarningsMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:RetainedEarningsMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:AdditionalPaidinCapitalMember 529900N8OA1GVSR5R946 2022-09-30 ifrs-full:AdditionalPaidinCapitalMember 529900N8OA1GVSR5R946 2022-09-30 energieag:ReservesUnderIfrs9Member 529900N8OA1GVSR5R946 2022-09-30 ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember 529900N8OA1GVSR5R946 2020-09-30 ifrs-full:NoncontrollingInterestsMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:NoncontrollingInterestsMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:ReserveOfRemeasurementsOfDefinedBenefitPlansMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:IssuedCapitalMember 529900N8OA1GVSR5R946 2020-09-30 ifrs-full:IssuedCapitalMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:RetainedEarningsMember 529900N8OA1GVSR5R946 2020-09-30 ifrs-full:RetainedEarningsMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember 529900N8OA1GVSR5R946 2020-09-30 ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:RevaluationSurplusMember 529900N8OA1GVSR5R946 2020-09-30 ifrs-full:RevaluationSurplusMember 529900N8OA1GVSR5R946 2020-09-30 ifrs-full:EquityAttributableToOwnersOfParentMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:EquityAttributableToOwnersOfParentMember 529900N8OA1GVSR5R946 2021-09-30 529900N8OA1GVSR5R946 2020-09-30 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:TreasurySharesMember 529900N8OA1GVSR5R946 2020-09-30 ifrs-full:TreasurySharesMember 529900N8OA1GVSR5R946 2020-09-30 ifrs-full:ReserveOfRemeasurementsOfDefinedBenefitPlansMember 529900N8OA1GVSR5R946 2020-09-30 energieag:ReservesUnderIfrs9Member 529900N8OA1GVSR5R946 2020-09-30 ifrs-full:OtherReservesMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:OtherReservesMember 529900N8OA1GVSR5R946 2020-09-30 ifrs-full:AdditionalPaidinCapitalMember 529900N8OA1GVSR5R946 2021-09-30 ifrs-full:AdditionalPaidinCapitalMember 529900N8OA1GVSR5R946 2021-09-30 energieag:ReservesUnderIfrs9Member 529900N8OA1GVSR5R946 2021-10-01 2022-09-30 iso4217:EUR iso4217:EUR xbrli:shares xbrli:pure iso4217:EUR xbrli:shares
Loading SVG
Annual Financial Report  
2021/2022  
of Energie AG Oberösterreich  
We care about tomorrow  
Loading SVG
Contents  
GROUP ANNUAL REPORT 2021/2022  
5
Group overview  
13 Non-financial report  
108 Group Management Report  
148 Consolidated Financial Statements  
243 Audit Certificate  
250 Statement by the Management Board  
COMPANY ANNUAL REPORT 2021/2022  
253 Audited Company Annual Report  
290 Company Management Report  
321 Audit Certificate  
327 Statement by the Management Board  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
GROUP ANNUAL REPORT 2021/2022  
SIMPLY TH RE.  
Since 1892.  
www.energieag.at/annualreport  
We care about tomorrow  
Loading SVG
Contents  
5
GROUP OVERVIEW  
108 GROUP MANAGEMENT REPORT  
6
Interview with the Management Board  
108 Group  
11 Report by the Supervisory Board  
108  
General conditions  
112  
Business development in the Group  
13 NON-FINANCIAL REPORT  
118  
Internal control system  
119  
Risks and opportunities  
13 Letter by the Management Board  
120  
Research, development and innovation  
15 About this report  
122  
Key performance indicators  
16 Business model  
123 Segments  
18  
Shareholder structure  
124 Energy Segment  
18  
Group management bodies  
131 Grid Segment  
22 Strategy and major sustainability issues  
134 Waste Management Segment  
33  
Sustainability objectives  
137 Czech Republic Segment  
35  
Sustainability at a glance  
140 Holding & Services Segment  
41 Economy  
145 Outlook  
47 Environment  
75 Social affairs  
148 CONSOLIDATED FINANCIAL STATEMENTS  
87 Employees  
95 Compliance  
148 Consolidated Statement of Income  
102 GRI content index  
149 Consolidated Statement of Comprehensive  
Income  
149 Consolidated Statement of Financial Position  
151 Statement of Changes in Equity  
155 Cash Flow Statement  
156 Notes  
243 Audit Certificate  
250 Statement by the Management Board  
EVERYTHING NEW FROM A SINGLE SOURCE.  
All contents of this Annual Report are available online with interactive  
functions at  
www.energieag.at/annualreport  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
5
Group overview  
Group overview  
ENERGIE AG OBERÖSTERREICH AT A GLANCE  
Unit  
2021/2022  
Change  
2020/2021  
Sales revenues  
Energy Segment  
EUR mill.  
3,132.9  
134.0%  
1,339.0  
Grid Segment  
EUR mill.  
378.7  
3.4%  
366.1  
Waste Management Segment  
EUR mill.  
263.6  
6.7%  
247.0  
Czech Republic Segment  
EUR mill.  
194.7  
12.5%  
173.1  
Holding & Services Segment  
EUR mill.  
32.2  
61.0%  
20.0  
Group  
EUR mill.  
4,002.1  
86.6%  
2,145.2  
Result  
Operating result (EBIT)  
EUR mill.  
150.6  
-20.1%  
188.4  
EBIT margin  
%
3.8  
-56.8%  
8.8  
Earnings before taxes (EBT)  
EUR mill.  
121.9  
-27.6%  
168.3  
Dividend per share  
EUR  
0.60  
-20.0%  
0.75  
Statement of Financial Position  
Balance sheet total  
EUR mill.  
6,912.7  
78.4%  
3,875.4  
Equity  
EUR mill.  
1,794.5  
16.8%  
1,535.8  
Equity ratio  
%
26.0  
-34.3%  
39.6  
Net debt 1)  
EUR mill.  
606.8  
-15.6%  
718.8  
Net gearing  
%
33.8  
-27.8%  
46.8  
Cash flow from operating activities  
EUR mill.  
1,136.5  
200.1%  
378.7  
Profitability  
ROCE  
%
6.9  
1.5%  
6.8  
Workforce (on average)  
Energy Segment  
FTE  
459  
-1.1%  
464  
Grid Segment  
FTE  
582  
8.8%  
535  
Waste Management Segment  
FTE  
831  
1.2%  
821  
Czech Republic Segment  
FTE  
1,715  
-0.2%  
1,718  
Holding & Services Segment  
FTE  
1,019  
-3.4%  
1,055  
Group  
FTE  
4,606  
0.3%  
4,593  
1) Net debt = non-current financial liabilities + current financial liabilities - cash and cash equivalents + cash receipts from futures  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
6
Group overview Interview with the Management Board  
INTERVIEW WITH THE MANAGEMENT BOARD  
OF ENERGIE AG OBERÖSTERREICH  
Dr. Andreas Kolar  
Chief Executive Officer DDr. Werner Steinecker MBA  
Dipl.-Ing. Stefan Stallinger MBA  
Member of the Management Board  
Chairman of the Management Board  
Member of the Management Board  
Video statements of the members of the Management Board are available as part of the online version of the annual report:  
www.energieag.at/annualreport  
The issue of security of supply has taken centre stage among the general public recently  
because of the war between Russia and Ukraine. What action has Energie AG  
Oberösterreich taken to safeguard security of supply in the short, medium and long term?  
Werner Steinecker: Ensuring the high supply quality of electricity, gas and heat on an  
ongoing basis is one of the most fundamental tasks to which Energie AG Oberösterreich is  
committed. This makes the current situation, in which the fragility of the European energy  
system has become apparent to us, all the more challenging. Measures including securing gas  
supplies, filling our storage facilities as much as possible and activating power plants as part  
of our congestion management strategy meant that we were able to continue supplying  
energy to our electricity and gas customers without restriction. Sooner or later, though, we  
will be faced with the only viable option of transforming the energy system as swiftly as  
possible. We will do everything we can to expand the use of renewable energies, enhance  
the grid infrastructure at all voltage levels and increase storage capacities.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
7
Group overview Interview with the Management Board  
Ensuring the high supply quality of electricity, gas and  
heat on an ongoing basis is one of the most fundamental  
tasks to which Energie AG Oberösterreich is committed.  
This makes the current situation, in which the fragility of  
the European energy system has become apparent to us,  
all the more challenging. Sooner or later, we will be faced  
with the only viable option of transforming the energy  
system as swiftly as possible. We will do everything we  
can to expand the use of renewable energies, enhance  
the grid infrastructure at all voltage levels and increase  
storage capacities.  
Werner Steinecker  
The energy sector is currently experiencing an extremely tumultuous time, including from  
a financial perspective. What actions have been taken to mitigate the current risks?  
Andreas Kolar: The Group has had a standardised and cross-departmental risk management  
system in place for a while now. Our decision to set up a Risk Committee has enabled us to  
monitor market conditions and the associated liquidity, counterparty and market price risks  
even more closely and to use these as a basis to make the necessary corporate decisions at an  
early stage. Our risk management systems here have played a role in supplying adequate  
information for business decisions by analysing and aggregating risks, working to mitigate  
threats in good time and to achieve the desired goals in the best possible way. Following the  
start of the war in February 2022, a task force was added to this committee to continuously  
analyse geopolitical developments and to implement measures both of a financial and a legal  
and technical nature.  
The general conditions have been unusually challenging in  
the year under review and are unlikely to let up in the  
near future. We will nevertheless continue to pursue our  
goals of supporting the transformation of energy systems,  
further optimising the security and quality of supply and  
thus safeguarding the Group’s development and value in  
the long term.  
Andreas Kolar  
Expanding the grid infrastructure is increasingly seen to be absolutely key in efforts to  
achieve the energy transition. What challenges will this entail?  
Stefan Stallinger: The challenges are many – not least because we want to accelerate the  
work to expand and upgrade electricity grids so as to enable the feed-in of decentrally  
generated green electricity for everyone. We are, however, in a supplier market, e.g.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
8
Group overview Interview with the Management Board  
regarding the availability of transformers or switchgears, due to high demand and low supply.  
Delivery times are significantly higher than three to five years ago due to material shortages.  
A key factor for making specific investments in the grid infrastructure is also the creation of  
regulatory incentives so that expansion is not hampered by financial obstacles (low interest  
rates). We are also concerned about the project approval procedures, which are at times quite  
lengthy and result in a lot of time being lost for the work to transform the energy system. We  
are encouraged, however, by the fact that high-performance electricity grids are increasingly  
seen by the population as an enabler of the energy transition and as the backbone of security  
of supply.  
We at Energie AG Oberösterreich see ourselves as  
pacemakers of the energy transition and want to enable  
everyone to participate in it through a variety of different  
measures. These range from numerous sales campaigns  
promoting a switch to heat pumps, customised PV  
contracting models for private households and companies  
and our role as an enabler in e-mobility issues to the work  
to expand district heating networks on an ongoing basis  
and the highly ambitious expansion path for our own  
electricity generation plants.  
Stefan Stallinger  
Energie AG Oberösterreich was able to maintain its “A, stable” rating despite the current  
economic environment. How did it manage this?  
Andreas Kolar: The excellent credit rating is partly due to the stable and risk-averse financial  
policy pursued by the Group in recent years. The rating agency Standard & Poor’s also  
acknowledges the integrated business model of Energie AG Oberösterreich, which makes it  
resilient in the face of a crisis. This fact is also reflected in the year under review, in which the  
weather-related decline in earnings in the Group’s traditional core segment Energy was  
partially compensated for by higher earnings contributions in the Grid and Waste  
Management Segments. This excellent rating once again underscores the Group’s impressive  
ability to perform – a prerequisite that has empowered Energie AG Oberösterreich to reliably  
meet the challenges posed by volatile and sharply rising energy prices and, not least, the  
economic impact of Russia’s war with Ukraine during the reporting period. Transforming the  
energy system in such a way as to make it climate neutral will require vast amounts of  
financial resources. Having the top rating “A, stable” confirmed enables us to face the  
demands of the future and to implement clear investment and financing targets.  
Energie AG Oberösterreich was named “Austria’s Best Employer” by the renowned Trend  
magazine. What were the primary reasons for this?  
Werner Steinecker: The award is a perfect way of achieving recognition for the large  
number of measures that have been implemented in recent years to foster an employee-  
friendly working environment. We are particularly proud of our ongoing work to improve our  
employees’ work-life balance, such as establishing a childcare facility at the head office of  
Energie AG Oberösterreich in summer 2022. We also attach great importance to the  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
9
Group overview Interview with the Management Board  
numerous models in place to support the continuous professional development of our  
employees. Expanding our trainee, training and mentoring programmes is a way for us to  
help ensure that colleagues are given room for development and personal growth. We are  
also pleased that the representative study saw us as a modern employer that focuses on key  
jobs of the future such as the energy transition, the circular economy and expanding  
broadband networks. The award is all the more valuable in such times where there is a  
shortage of skilled workers.  
The Austrian government aims to generate almost 45% more green electricity than  
before by 2030. How can this Herculean task be achieved and what role will Energie AG  
Oberösterreich play here?  
Stefan Stallinger: The Austrian government’s climate and energy targets are undoubtedly  
ambitious, driven by the momentum of the crisis, but we are also noticing a sharp rise in  
levels of commitment from industry, politics and the population to forge ahead with efforts  
to transform the energy system. Both to reduce dependence on global energy imports and to  
optimise our own carbon footprint for the sake of climate change mitigation and  
sustainability. We at Energie AG Oberösterreich see ourselves as pacemakers of the energy  
transition and want to enable everyone to participate in it through a variety of different  
measures. These range from numerous sales campaigns promoting a switch to heat pumps,  
customised PV contracting models for private households and companies and our role as an  
enabler in e-mobility issues to the work to expand district heating networks on an ongoing  
basis and the highly ambitious expansion path for our own electricity generation plants. The  
aim is to produce regionally sourced green electricity for an additional 180,000 households  
through the construction of hydropower plants, wind farms and PV installations by 2030.  
These measures alone will enable us to save over 550,000 tonnes of CO2 and cut energy  
imports by as much as 500 GWh.  
Rising energy prices have become a major burden for an ever-growing proportion of the  
population in 2022. How has Energie AG Oberösterreich dealt with this situation?  
Werner Steinecker: Fortunately, we have been able to maintain the price guarantee for  
electricity and gas that was announced in October 2021 until 1 January 2023, a fact made  
possible by having a forward-looking energy procurement policy focused on minimising risk.  
Legislative relief such as the abolition of the flat rate for green electricity and the green  
energy subsidy, and energy cost compensation being granted means that existing customers  
of Energie AG Oberösterreich paid less for their electricity in 2022 than in the previous year  
while their consumption remained unchanged. We are pleased that we were able to  
demonstrate to our customers that we are a reliable partner even in such challenging times.  
What challenges will this spell for the 2022/2023 fiscal year?  
Andreas Kolar: We have been in a kind of permanent crisis for nearly three years now, one  
which has recently intensified in terms of the diversity and complexity of the problems we  
face. One of these problems is the general economic outlook, which is characterised by  
persistently high rates of inflation and low growth forecasts. Despite these general  
conditions, there are plans to invest more than EUR 250 million in a sustainable energy future  
in the 2022/2023 fiscal year, which will make a key contribution to regional value creation.  
The availability of material and human resources will be crucial in efforts to realise these  
plans, as will the length of the procedure for approving relevant projects. The aim is to  
support the transformation of energy systems, to further optimise the security and quality of  
supply and thus to safeguard the Group’s development and value in the long term. We are  
confident of our ability to continue successfully mastering such challenges in the future.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
10  
Group overview Interview with the Management Board  
The share of fossil fuels used to supply heat remains very high, and with it the level of  
global dependency. How can this be countered?  
Stefan Stallinger: The recently completed district heating project for the city of Wels is a  
very good example of how this objective can be achieved. The second largest city in Upper  
Austria has been supplied exclusively with sustainable energy since May by harnessing the  
industrial waste heat coming from our waste incineration plant WAV. The sector coupling  
solution also means that the population of Wels is not affected by any gas supply shortages  
or by the extreme gas price volatility. Not only is sector coupling essential through the use of  
industrial waste heat, but also through the future production of green hydrogen from  
renewably sourced electricity. Energie AG Oberösterreich is involved in various hydrogen  
research projects in order to contribute to making the climate-neutral and storable energy  
carrier an essential part of the energy and heat transition. The basis for this is the ambitious  
work to increase renewable electricity generation activities.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
11  
Group overview Report by the Supervisory Board  
REPORT BY THE SUPERVISORY BOARD  
PURSUANT TO § 96 OF THE STOCK CORPORATION  
ACT [AKTIENGESETZ (AKTG)]  
During the 2021/2022 fiscal year, the Management Board informed the Supervisory Board  
and the Supervisory Board Audit Committee about the activities of the Group and its  
subsidiaries in writing and orally on a regular basis, and it discussed all important business  
events with these bodies. A total of four periodical ordinary meetings of the Group  
Supervisory Board were held in fiscal year 2021/2022 along with two ordinary meetings of  
the Audit Committee. The management bodies gave their approval to all business events,  
which is mandatory in specific cases. No objections were raised in the course of the general  
supervisory activities or the audit.  
The annual financial statements of Energie AG Oberösterreich for the 2021/2022 fiscal year,  
from 1 October 2021 to 30 September 2022, drawn up according to the Austrian accounting  
regulations, together with the accounts and the management report, were audited by  
Deloitte Audit Wirtschaftsprüfungs GmbH, Chartered Accountants. The auditor submitted a  
written report on his audit findings and assessed that the annual financial statements comply  
with the statutory requirements, give a true and fair view of the assets, liabilities, financial  
position and profit or loss, and that the management report complies with the legal  
requirements and reconciles with the annual financial statements. The auditor therefore  
issued an unqualified audit certificate.  
The Supervisory Board examined the annual financial statements as of 30 September 2022,  
together with the notes and the management report, as well as the proposal for the  
appropriation of the profit. It drew up a written report and recommended that the  
Supervisory Board approve the auditor’s report, together with the auditor’s unqualified  
certificate, as well as the present annual financial statements as of 30 September 2022,  
together with the notes and the management report, so as to thus adopt the annual financial  
statements as of 30 September 2022. The Audit Committee also recommended that the  
Supervisory Board adopt the proposal by the Management Board for the appropriation of the  
profit. The Supervisory Board noted with approval the outcome of the review conducted by  
the Audit Committee and of the audit conducted by the auditor, and established that the  
Supervisory Board, in turn, has no objections regarding the statements. The Supervisory Board  
states that it is in agreement with the management report, presented in accordance with  
§ 96 of the Austrian Stock Corporation Act, and with the proposal for the appropriation of  
the profit, and that it adopts the annual financial statements as of 30 September 2022, which  
is thus established.  
The Consolidated Financial Statements for the 2021/2022 fiscal year from 1 October 2021 to  
30 September 2022 drawn up in accordance with the International Financial Reporting  
Standards (IFRS), were also audited by Deloitte Audit Wirtschaftsprüfungs GmbH. The Group  
auditor submitted a written report on his audit findings and assessed that the Consolidated  
Financial Statements comply with the statutory requirements, give a true and fair view of the  
assets, liabilities, financial position and profit or loss as well as the Group’s cash flows, and  
that the Management Report complies with the legal requirements and reconciles with the  
Consolidated Financial Statements. The Group auditor therefore issued an unqualified audit  
certificate. The Supervisory Board examined the Consolidated Financial Statements and the  
Group Management Report in detail. The Audit Committee also examined the Consolidated  
Financial Statements and the Group Management Report in detail. It drew up a written report  
and recommended that the Supervisory Board approve the auditor’s report, together with the  
auditor’s unqualified audit certificate, as well as the present Consolidated Financial  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
12  
Group overview Report by the Supervisory Board  
Statements as of 30 September 2022, together with the notes and management report. The  
Supervisory Board noted with approval the outcome of the review conducted by the Audit  
Committee and of the audit conducted by the Group auditor, and established that the  
Supervisory Board, in turn, has no objections regarding the statements.  
By drawing up the Consolidated Financial Statements in accordance with the IFRS, the  
company is released from its obligation to prepare Consolidated Financial Statements in  
accordance with Austrian commercial law provisions.  
The consolidated Non-financial Report, which is compulsory under § 267a of the Austrian  
Commercial Code (UGB) and is published as a separate part of the Group annual report, was  
prepared by the Management Board in compliance with the statutory requirements. The  
internal audit unit of Energie AG Oberösterreich has reviewed the Non-financial Report on  
behalf of the Supervisory Board and formed the opinion that the Non-Financial report was  
prepared in compliance with the statutory requirements. The Supervisory Board agrees with  
the findings of the review conducted by the internal audit unit and confirmed that it holds no  
objections against them. It was established that – in accordance with § 243c of the Austrian  
Commercial Code (Unternehmensgesetzbuch, or UGB) – there is no obligation to prepare a  
corporate governance report, and that in accordance with § 243d UGB, there is also no  
obligation to prepare a report on payments to government agencies.  
The Supervisory Board would like to express its thanks to the Management Board and all  
company staff members for their successful work during the 2021/2022 fiscal year.  
Linz, 20 December 2022  
On behalf of the Supervisory Board  
The Chairman of the Supervisory Board  
Provincial Counsellor Markus Achleitner  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
13  
Non-financial report  
Report on non-financial information 2021/2022  
for Energie AG Oberösterreich  
LETTER BY THE MANAGEMENT BOARD  
GRI 102-14  
The past fiscal year was characterised by an unprecedented level of volatility on the energy  
markets. Market prices for electricity and gas saw dramatic rises within just a few months, a  
fact made all the more remarkable given that they were already at all-time highs. The  
turbulence being experienced on the market is due to the widening gap between the shorter  
supply of primary energy sources and the growing demand in the economy for these.  
Concerns about potential shortages also had the effect of driving up prices. As one of  
Austria's largest energy utility companies, we feel a particular sense of duty under these  
conditions to keep expanding our already well-developed stakeholder management concept  
and, in doing so, living up to our role as a responsible employer, a reliable partner for  
suppliers and customers and an enabler in efforts to achieve sustainable future for energy.  
The aim of this non-financial report is to give you an insight into the work of Energie AG  
Oberösterreich from the perspective of the United Nations' Sustainable Development Goals  
and the corporate principles based on these.  
Energie AG Oberösterreich has always had ensuring security of supply and a high supply  
quality for our customers as its top priority. Maintaining a reliable supply has become an even  
greater task as a result of the Russian war of aggression against Ukraine and the impact it has  
had. In light of this, we have done everything we can to establish a range of measures aimed  
at safeguarding security of supply. Such measures included securing gas supplies, filling our  
storage facilities as much as possible and activating power plants as part of our congestion  
management strategy and meant that we were able to continue supplying energy to our  
electricity and gas customers without restriction. The current situation lays bare to us the  
importance of expanding the grid infrastructure and the use of renewable energies at an  
even faster pace to improve our energy independence. The long-term focus on a green  
energy future is reflected in the capital expenditure of Energie AG Oberösterreich recognised  
by the EU taxonomy. This is the case for 84% of all capital expenditure, a very high  
percentage that is to be increased further still. What this also does is underscore the highly  
ambitious strategic generation goals of Energie AG Oberösterreich, according to which the  
company aims to produce regional green electricity for 180,000 additional households by  
2030. We will also invest over EUR 1.0 billion in expanding the grid infrastructure to enable  
the energy transition during the same period of time.  
Inflation, which was strongly driven by energy prices, increasingly evolved into a major  
burden for the general population in the past fiscal year. Despite the prevailing conditions on  
the market, Energie AG Oberösterreich was able to maintain the price guarantee promise  
made in October 2021 until 1 January 2023. This approach has enabled us to proactively  
procure energy at even lower market prices, keeping risk to a minimum. By doubling the  
funding for the energy solidarity budget, expanding advisory services and promoting energy  
efficiency measures, we want to fulfil our obligation vis-à-vis society and, above all, actively  
support customers who are particularly affected in their efforts to save energy and costs.  
We firmly believe that the current environment requires an even greater degree of active and  
transparent communication and interaction with customers, which is why the corresponding  
sales activities, such as the customer forum to involve customers in product design, have been  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
14  
Non-financial report Letter by the Management Board  
further promoted. The Group has long seen conducting a dialogue with stakeholders as a  
valuable strategic instrument to strengthen long-term collaboration with key partners. By way  
of example, the 100th meeting of the Environmental Commission, a successful citizen  
participation model established more than three decades ago, was held a few months ago.  
This commission ensures residents served by the waste incineration plant in Wels are regularly  
informed about the plant's current developments and its compliance with emission limits.  
Over the years, this process has helped foster a sense of mutual understanding and trust, and  
there is now a very constructive dialogue on further development and improvements, for  
example when it comes to minimising noise and odour emissions.  
The Energie AG Group acknowledges that the Group’s success depends on the commitment  
of its employees and therefore seeks to solidify its reputation as an attractive employer on an  
ongoing basis and to offer a work environment that not only offers interesting development  
opportunities, but also accommodates the individual needs of its employees. It is against this  
backdrop that a large number of HR measures have been implemented in recent years aimed  
at improving employee work-life balance, providing training and further development  
opportunities, and offering flexible working hours. We are therefore proud to have been  
named Austria's best employer in the recognised cross-industry trend ranking in 2022, in  
which Energie AG Oberösterreich was particularly notable as an employer focused squarely  
on the future. Being recognised in this way encourages us to continue our human resources  
policy and makes us confident that we will be able to meet the upcoming business challenges  
as a responsible employer despite the general shortage of skilled workers.  
Energie AG consistently seeks to put environmental, social and public welfare issues at the  
forefront of our agenda. We hope that this report on non-financial information can provide a  
good overview and look forward to working together with you as we continue to pursue a  
sustainable development.  
The Management Board of Energie AG Oberösterreich  
Chief Executive Officer  
DDr. Werner Steinecker MBA  
Dr. Andreas Kolar  
Dipl.-Ing. Stefan Stallinger MBA  
Chairman of the Management Board  
Member of the Management Board  
Member of the Management Board  
CEO  
CFO  
COO  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
15  
Non-financial report About this report  
ABOUT THIS REPORT  
GRI 102-1, 102-32, 102-46, 102-50, 102-51, 102-52, 102-53, 102-54  
As per the European Union (EU) Directive 2014/95/EU on the disclosure of non-financial and  
diversity information (NFR Directive) and its implementation in accordance with the Austrian  
Sustainability and Diversity Improvement Act 2017 (Nachhaltigkeits- und  
Diversitätsverbesserungsgesetz; NaDiVeG), Energie AG Group has been publishing the  
necessary information in a separate report on non-financial information (non-financial  
report) since the 2017/2018 fiscal year. This publication is the consolidated non-financial  
report for Energie AG Oberösterreich (Energie AG) in accordance with § 267a of the Austrian  
Commercial Code (UGB). This report is published on an annual basis together with the Group  
Annual Report. The reporting period covers the full fiscal year from 1 October 2021 to 30  
September 2022. The legal requirements pertaining to the non-financial report were taken  
into account with external assistance based on international frameworks. The report on non-  
financial information is based on the standards published by the “Global Reporting Initiative”  
(GRI). This report was prepared in accordance with the GRI standards, “core” option, and also  
offers information on additional performance indicators, including selected indicators of the  
GRI sector supplements for companies from the electricity industry. An overview is provided  
in the GRI content index › Page 102.  
Commencing with fiscal year 2021/2022, Energie AG Group is required to disclose  
information on environmentally sustainable revenues, investments (capex), and operating  
expenses (opex) in accordance with the EU Taxonomy Regulation. The application of Article  
8 of the Taxonomy Regulation in relation to the two published environmental goals “climate  
change mitigation” and “climate change adaptation” as well as the disclosure of taxonomy-  
eligible economic activities for fiscal year 2021/2022 is described in the section headed  
Economy › Page 41.  
In addition to this Non-Financial Report, Energie AG provides information about its corporate  
responsibility in an annual Group Management Report › Page 108, in the › Semi-annual  
Report and on its › company website.  
› Spokesman and Head of Group Communications Michael Frostel MSc is available to  
answer any questions regarding this report.  
This Non-Financial Report presents non-financial information about Energie AG’s activities,  
the activities of the consolidated Group companies and the activities of the associated  
companies. It is broken down into the sections Economy, Environment, Social affairs,  
Employees and Compliance (with the latter including respect for human rights and the fight  
against corruption). Disclosures about topics of lesser relevance have not been provided. Key  
figures are also presented, with any discrepancies noted separately.  
The equal treatment of all genders is an important concern of Energie AG Group. In  
fiscal year 2021/2022, the company has therefore implemented a gender-neutral style in its  
external and internal communications. The gender-neutral style has also been adopted in this  
Non-financial report (German version).  
This report was created with the utmost care and attention and was examined in the Energie  
AG Group audit directly commissioned by the Supervisory Board. The Supervisory  
Board will report on this after fiscal year end on the next annual general meeting.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
16  
Non-financial report Business model  
THE BUSINESS MODEL  
OF ENERGIE AG OBERÖSTERREICH  
GRI 102-2, 102-3, 102-4, 102-6, 102-48 (Group management Report)  
The business model of Energie AG Group covers the entire value chain of energy: from  
energy generation to the construction and operation of electricity and gas grids as well as the  
supply of consumers with electricity, gas and heat. Additionally, customers in Austria are also  
offered telecommunication products and energy-related services. The Group offers an  
integrated waste management and waste management solutions to its customers in Austria  
and northern Italy, while those in the Czech Republic are supplied with drinking water, heat  
and wastewater management services.  
2022 is also the year in which Energie AG celebrates its 130th anniversary. The › history of  
Energie AG is manifest in the milestones achieved by the Group since its formation in the  
year 1892.  
Energie AG is headquartered in Linz, Upper Austria. Energie AG’s market area includes  
Austria, the Czech Republic, and Northern Italy. Operational electricity and gas-related sales  
activities in Germany were discontinued at the end of calendar year 2021.  
As a provider of electricity, gas, heating, water as well as energy, waste management,  
information and communication technology services, the Company works to deliver the  
highest levels of quality and reliability in its products, processes and services.  
As a competent, responsible and competitive Group, Energie AG aspires to offer its customers  
products and services that generate additional value, represent fair value and are regionally  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
17  
Non-financial report Business model  
available. This helps to assure a general spirit of partnership when interacting with customers,  
employees, suppliers and the general public.  
The Energy Segment › Page 55 is the Company’s core business and consists of electricity and  
heat generation, the trade with energy and energy-related products, electricity and gas sales,  
heat supply in Austria and sales of telecommunication services. The range of services also  
encompasses certain energy services, such as energy audits for large organisations, energy  
certificates and building modernisation plans, charge cards for electric mobility charging  
stations, special energy contracting models and system optimisation strategies.  
The Grid Segment › Page 65 comprises the construction and operation of the electricity and  
gas grid as the backbone of Upper Austria’s supply with electricity and gas by Netz  
Oberösterreich GmbH (Netz OÖ GmbH), a fully owned subsidiary of Energie AG.  
The Waste Management Segment › Page 67 offers integrated waste management and  
individual waste management solutions in Austria and Northern Italy. This includes the  
collection, acceptance, storage, sorting, management and incineration (including slag  
processing) of domestic and commercial waste, as well as recovery and reuse of recycling  
materials in this area.  
The Czech Republic Segment › Page 71 offers comprehensive drinking water supply and  
waste water management services in the Czech Republic. The business models include  
concession, operator and service contracts; specialised water, waste water and heating  
services; and construction and installations. Cities, local authorities, associations, industrial  
enterprises, housing companies and housing cooperatives are the contractual partners who  
form the Czech Republic Segment’s client base.  
In addition to the management and control functions of the holding company, the Holding &  
Services Segment › Page 72 comprises the Telecommunications business area, commercial  
and technical services and some subsidiaries consolidated at equity that are not assigned to  
other segments. The commercial and technical service companies provide services for the  
entire Group.  
Disclosures about changes under corporate law during the 2021/2022 fiscal year are provided  
in the Group Management Report, Changes under corporate law › Page 117. The Group  
Annual Report includes an overview of financial key figures Energie AG Oberösterreich at a  
glance › Page 5.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
18  
Non-financial report Business model  
SHAREHOLDER STRUCTURE  
GRI 102-5  
In the 2021/2022 fiscal year, the shareholder structure of the Energie AG Group is as follows:  
OÖ Landesholding GmbH  
52.71%  
Land Oberösterreich  
0.10%  
Linz AG für Energie, Telekommunikation, Verkehr und Kommunale Dienste  
10.35%  
TIWAG-Tiroler Wasserkraft AG  
8.28%  
Raiffeisen Oberösterreich (Konsortium)  
13.98%  
Oberbank AG (Konsortium)  
5.18%  
VERBUND AG  
5.20%  
voestalpine Stahl GmbH  
2.07%  
Oberösterreichische Landesbank Aktiengesellschaft  
1.04%  
Allgemeine Sparkasse Oberösterreich Bankaktiengesellschaft  
0.52%  
Oberösterreichische Versicherung Aktiengesellschaft  
0.52%  
Energie AG Belegschaft Privatstiftung  
0.05%  
As of 30 September 2022  
GROUP MANAGEMENT BODIES  
GRI 102-18, also see the Group Management Report, Change in the Management Board  
Management Board  
Chief Executive Officer Professor Commercial Council Ing. DDr. Werner STEINECKER MBA,  
Chairman of the Management Board  
Commercial Council Mag. Dr. Andreas KOLAR, Member of the Management Board  
Dipl.-Ing. Stefan STALLINGER, MBA, Member of the Management Board  
Supervisory Board  
Shareholder representatives  
Provincial Councillor Markus ACHLEITNER, Chairman  
Solicitor Mag. Stefan LANG LL.M., Vice-Chairman  
Chief Executive Officer Dr. Heinrich SCHALLER, Deputy Vice-Chairman  
Head of Administrative Department Dr. Miriam EDER MBA  
Chairman of the Management Board Mag. Dr. Erich ENTSTRASSER  
Managing Director Mag. Dr. Christiane FRAUSCHER  
Member of Management Board Mag. Florian HAGENAUER MBA  
Chief Executive Officer Dipl.-Ing. Erich HAIDER MBA  
Secretary General Emerita Mag. Anna Maria HOCHHAUSER (retired on 17 December 2021)  
Deputy to Chief Executive Officer Commercial Council Mag. Michaela KEPLINGER-MITTERLEHNER  
Dr. Elisabeth KÖLBLINGER (since 17 December 2021)  
Member of Management Board Mag. Kathrin Renate KÜHTREIBER-LEITNER MBA  
Head of Local Parliamentary Group, Member of State Parliament, Commercial Council Ing. Herwig MAHR  
Gertrude SCHATZDORFER-WÖLFEL (since 4 March 2022)  
Thomas Peter STADLBAUER MSc MBA MPA  
Josef WALCH, Chartered Accountant and Tax Consultant (retired on 17 December 2021)  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
19  
Non-financial report Business model  
Employees’ representatives  
Ing. Mag. Leopold HOFINGER, Head of Works Council (retired on 21 April 2022)  
Mag. Dr. Regina KRENN, Head of Works Council  
Ing. Peter NEISSL MBA MSc, Head of Works Council  
Edith SCHATZDORFER, Head of Works Council (since 21 April 2022)  
Ing. Bernhard STEINER, Head of Works Council Group Representatives  
Gerhard STÖRINGER, Head of Central Works Council  
Christian STROBL, Head of Works Council  
Andreas WALZER, Head of Works Council  
GROUP STRUCTURE  
GRI 102-18  
The Management Board of Energie AG Oberösterreich manages the Group’s affairs and  
represents Energie AG Group externally. In addition to the Austrian Stock Corporation Act  
(Aktiengesetz), the Commercial Code (Unternehmensgesetzbuch), and the Articles of  
Association, the actions of the Management Board and Supervisory Board are governed by  
their respective rules of procedure. The Rules of Procedure of the Management Board  
regulate the collaboration among the members of the Management Board, the Management  
Board’s information and reporting duties, and transactions that require approval from the  
Supervisory Board. The Rules of Procedure of the subsidiaries are based on those of the  
Management Board and contain equivalent provisions. The allocation of portfolios between  
members of the Management Board is approved by the Supervisory Board and defines the  
areas of responsibility of the individual members of the Management Board without  
prejudicing the Board’s overall responsibility. The topic of sustainability falls within the  
responsibility of the full Management Board and is coordinated by the holding unit Group  
Strategy as part of the strategy process. As a control body, the Supervisory Board’s statutory  
duties include a review of the non-financial report and presentation of the review’s finding to  
the General Meeting.  
Energie AG has revised its strategy for the expansion of Fibre To The Home (FTTH) with the  
aim of continuing to promote the best possible growth in this area, and create better  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
20  
Non-financial report Business model  
economic conditions for fibre-optic expansion in Upper Austria with the greatest possible  
coverage, despite the high degree of urban sprawl and the relating building costs. As a result,  
the operational unit FTTH at Energie AG Oberösterreich Telekom GmbH (Telekom GmbH) was  
merged with Fiber Service OÖ GmbH, an indirect wholly-owned subsidiary of the Province of  
Upper Austria. This led to the formation of a new entity, BBOÖ Breitband Oberösterreich  
GmbH (BBOÖ), which is 50% owned by the State of Upper Austria and 50% by Energie AG,  
and bundles the FTTH activities. The FTTH business of Telekom GmbH was spun off to this  
newly formed entity.  
The fibre-optic backbone and the business customer sector remain with Telekom GmbH. The  
future focus of Telekom GmbH will be on providing the layer 2 technology (signal technology)  
and on backbone data transport for BBOÖ. The FTTH fibre-optic network, part of the spun-  
off FTTH operational unit, was transferred to BBOÖ Breitband Oberösterreich Infrastruktur  
GmbH, a wholly owned subsidiary of BBOÖ. Further information can be found in Social  
affairs, supply security and quality › Page 75, as well as in the Group Management Report,  
Changes under corporate law › Page 117 and Holding & Services Segment › Page 140.  
The transfer of the “Metering Services” department from Telekom GmbH to Netz OÖ  
GmbH on 1 October 2021, which combined the gas and electricity metering in Netz OÖ  
GmbH, constitutes a material change in the Group’s structure. Another material change is  
manifest in Energie AG Oberösterreich Vertrieb GmbH (Vertrieb GmbH) selling all shares in  
Erdgas Oberösterreich Vertriebs GmbH (Erdgas Vertriebs GmbH) in Germany to Energie AG  
Oberösterreich Tech Services GmbH (Tech Services GmbH) on 15 September 2022. Following  
the end of gas sales activities in Germany at the end of 2021 and owing to the fact that this  
entity is only used to process the claim related to the damage at the Grabsleben biogas plant,  
Erdgas Vertriebs GmbH now comes under the relevant subsidiary within the Group.  
In addition to the line and project organisation, Energie AG Group has an established crisis  
and emergency management system with regular drills and meetings convened as  
required. In the 2021/2022 fiscal year, a dedicated taskforce was formed and established to  
deal with the impact of the war between Russia and Ukraine on the energy market, supply  
situation and market position.  
Further information about changes under corporate law during the 2021/2022 fiscal year can  
be found in the Group Management Report, Changes under corporate law › Page 117.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
21  
Non-financial report Business model  
KEY FIGURES AT A GLANCE  
GRI 102-7  
* The shorter length of the fibre-optic network in comparison to the previous year (7,021 km) results from the spin-  
off of the FTTH business. The length of the fibre-optic network that remains with Energie AG Group refers to the  
backbone and business customer segment.  
** Starting with fiscal year 2021/2022, the average waste volume handled of the Waste Management Segment  
includes the volumes from Energie AG Südtirol Umwelt Service GmbH and RVL Reststoffverwertung Lenzing GmbH.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
22  
Non-financial report Strategy and major sustainability issues  
STRATEGY AND MAJOR SUSTAINABILITY ISSUES  
GRI 102-44, 102-46, 102-47, 102-49  
Energie AG Group is consciously exercising its responsibility in the area of sustainable  
development and accepts guidance from the contents and objectives of the Sustainable  
Development Goals (SDGs) adopted by the United Nations in 2015. These goals are  
intended to assist all nations in making significant progress in their sustainably development  
until the year 2030. The Group contributes to the achievement of the SDGs with its strategic  
positioning in combination with its individual products and service offerings, also see  
Sustainability at a glance › Page 35.  
Source: Sustainable development goals  
A structured annual strategy process is a prerequisite for consistent control over the  
Energie AG Group’s long-term business development. Strategies and measures that assure  
the sustainability of the Group’s profitability and financial performance are derived from  
market development analyses, the evaluation of the business activities’ effects in an  
economic, ecological, and social context (monitoring processes, certifications etc.), the  
balancing of the Group’s strategic goals with the interests and expectations ascertained  
during the ongoing dialogue with stakeholders and the energy policy environment (new  
statutory requirements etc.).  
The annual strategy conference of the Management Board of Energie AG Group took place  
in April 2022. It focused on an analysis of the prevailing fundamental economic, geopolitical  
and legal conditions and associated opportunities and risks for Energie AG.  
The strategic course of Energie AG together with the necessary capex resources was  
communicated in the Group strategy conference held in July of 2022. In addition to the  
current challenges and developments, which include the development of gas and electricity  
prices, inflation and strategy implementation, the group strategy conference examined the  
human resources strategy and the topic of “how we will work in the future” in further detail.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
23  
Non-financial report Strategy and major sustainability issues  
MAJOR SUSTAINABILITY ISSUES  
As part of the strategy development process, Energie AG’s major sustainability issues are  
regularly evaluated and undergo continuous improvement with the involvement of internal  
and external interested parties. Sustainability topics were rated in a materiality matrix from  
”important“ to ”highly important“. The quantitative and qualitative key performance  
indicators to be measured were set based on this matrix. The matrix was last updated in  
fiscal year 2020/2021 and adapted to the results of the strategy process.  
The focus of the Group’s commercial activities lies on the mid- and long-term positive  
development of the major sustainability issues of Energy AG Group. The major sustainability  
issues for Energie AG Group have not changed from the previous year and are discussed in  
the following sections:  
Economy › Page 41 and Group Management Report › Page 108  
Partnership with equity investors and outside creditors  
Business models fit for the future & innovation  
Social affairs › Page 75  
Security and quality of supply  
Customer orientation and satisfaction  
Regional responsibility & social commitment  
Environment › Page 47  
Climate protection & resource conservation  
Employees › Page 87  
Acting as a responsible employer  
Workplace health and safety  
Compliance (incl. Respect for human rights) › Page 95  
Legal compliance and prevention of corruption  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
24  
Non-financial report Strategy and major sustainability issues  
DIALOGUE WITH STAKEHOLDERS  
GRI 102-16, 102-40, 102-42, 102-43, EU-DMA (formerly EU19)  
Energie AG utilises open stakeholder dialogue as a valuable strategic instrument and has  
defined it as an essential pillar for initiatives in the field of sustainability.  
Energy AG Group is maintaining extensive relations with different groups of stakeholders:  
Among the Group’s many stakeholders, Energie AG affords special attention to its  
customers. The intense exchange with internal and external stakeholders is mainly used to  
satisfy the needs of customers in the best possible way. The Group also seeks to stay in  
contact with existing, new and potential staff members. In terms of future employees, this is  
on the one hand facilitated by the Group’s presence at job fairs held at secondary schools,  
technical colleges and universities. On the other hand, discussions with new employees,  
apprentices and their parents as well as student interns are held to precisely analyse and  
adequately accommodate the interests of the various stakeholder groups. The strong focus  
on employees in 2021/2022 was also reflected in the Trend award as Austria’s best  
employer, which saw Energie AG taking the first place among 1,400 Austrian employers  
from 19 industry sectors.  
The customer forum is a place where current sales projects are subjected to a critical and  
constructive dialogue, see Social affairs, customer focus › Page 78.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
25  
Non-financial report Strategy and major sustainability issues  
Under the remit of the Group’s socio-political responsibility, Energie AG is seeking to engage  
in direct contact with stakeholders on regional and interregional events, e.g. at the  
occasion of Energie AG’s 130th anniversary, and at the occasion of the regional sales  
roadshow. These contacts serve the purpose of informing customers about practical solutions  
for a responsible consumption of natural energy sources.  
Transparent information and communication is important to the Energie AG Group, in  
particular in the case of infrastructure projects that interfere with sensitive habitats and  
biospheres. In order to arrive at the greatest possible consensus and understanding for the  
measures, the affected stakeholders are already provided with information about the projects  
during the early planning phase and are directly involved in selected procedural steps.  
A prime example of sustainable cooperation is the citizen participation model that was  
implemented for the waste incineration plant in Wels. The model has been running since  
1991, making it the longest active model of a public participation, mediation and project  
environment management process. The central element of this model is an Environmental  
Commission, which acts as a link between the Energie AG Group as the operator of the  
waste incineration plant and the neighbouring communities. Thanks to open and transparent  
communication that went hand in hand with assuring a compliant process (compliance with  
emission limits, minimising noise and smell), this approach has created and sustainably  
fostered an atmosphere of mutual understanding and trust. The 100th meeting of the  
Commission for Environmental Policy was celebrated in the summer of 2022.  
The model was extended by › Energie AG’s principles on democratic politics, which  
articulate the Group’s voluntary commitment to considering the interests of stakeholders  
affected by infrastructure projects and approval proceedings in particular beyond the scope  
prescribed by law.  
The › Guidelines for planning processes for (new) high-voltage routes developed in March  
2017 serve the purpose of preventing conflicts in grid construction/extension projects, and  
especially with regard to the planned routes for 110-kV high voltage lines. Emulating the  
proven route planning process in civil engineering, these guidelines assure that the objectively  
best possible route is identified from a broad interdisciplinary perspective on the basis of  
established fundamental principles.  
These guidelines were applied for the first time at the occasion of the Mühlviertel  
Electricity Supply project (110-kV project Rohrbach – Bad Leonfelden – Rainbach, a joint  
project between Netz OÖ and LINZ NETZ GmbH). The advantages and disadvantages of  
potential routes were discussed with all interested parties. This process delivers a planning  
corridor in which the project operators can prepare the detail planning in close consultation  
and direct dialogue with the landowners.  
The Energie AG Group acknowledges that the Company’s success depends on the  
commitment of its employees and therefore seeks to solidify its reputation as an attractive  
employer and to offer a work environment that not only offers interesting development  
opportunities, but also accommodates the individual needs of its employees.  
The contact to schools, educational institutions and associations is fostered in cooperation  
projects, network events and sponsoring as well as at the various trade exhibitions. The  
modern job application platform “digiTalent” facilitates the professional communication with  
job candidates. The dialogue with staff members starts with the student interns, who in  
the summer of 2022 were invited to a “school interns breakfast event” held at the Group’s  
headquarters in Linz. Among other measures, surveys are used for the purpose of including  
the internal stakeholders. Feedback from the individual managers and employees is collected  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
26  
Non-financial report Strategy and major sustainability issues  
on many measures such as personnel and management development events, projects and  
regulations with the aim of deriving an action plan from them.  
To optimise internal processes and procedures, Energie AG Group is holding internal  
competitions for the best ideas that will allow the Group to harness the wealth of  
practical experience and creative potential of its employees (projects “Neuland”,  
“Loominati”). The winning projects are determined in a multi-stage selection process and  
implemented without any further delay. This opportunity to become directly involved in  
shaping the Company’s fortunes affords special appreciation to the project team members,  
while the optimised processes benefit the Group as well as the employees and customers  
affected by them. Also see Economy, innovation › Page 41.  
Further information and initiatives pursued by Energie AG Group with the aim of considering  
the wishes and needs of this important group of stakeholders can be found in section  
Employees – responsible employer › Page 87.  
The foundation for the implementation of the Group’s stakeholder management is Energie  
AG’s › Code of Conduct titled › “This is how we think, this is how we act” and the  
› “Code of Conduct for Contractors”, which was introduced in Austria in  
fiscal year 2021/2022. The codes define the principles that underpin fair, transparent and  
sustainable business practices. Every single employee and contractor endorses and commits  
to these principles: responsibility, reliability, quality awareness, sustainability, transparency,  
respect, integrity and non-discrimination.  
Media analysis  
The non-financial information of Energie AG is supplemented by reports in relevant media in  
Upper Austria and across Austria on topics that touch on the affairs of the Group. The media  
interest in fiscal year 2021/2022 focused on Energie AG’s activities in the context of the  
dramatic price developments on the energy markets since the autumn months of 2021 and  
on the threat of shortages in Europe’s supply with natural gas from Russia stemming from the  
war between Russia and Ukraine. The media responded positively to the initiatives of Energie  
AG Group seeking to secure the energy supply and drive the further development of  
renewable energies, manifest in the extension of the SolarCampus in Eberstalzell and the  
impressive progress made in expanding the electricity grid in Upper Austria.  
The media also reported in fond words on Energie AG’s social initiatives (helping customers  
with a price guarantee, temporary special conditions for business customers etc.) as well as  
those aimed at promoting the efficient use of energy. The accolades were mainly focused on  
Energie AG’s special offers in the area of sustainability, e.g. the reports on the measurement  
of the CO2 footprint by Energie AG’s subsidiary IfEA Institut für Energieausweis GmbH (IfEA),  
the promotion of renewable energy syndicates, the presentation of the regional E-Partner  
network, and the › E-Fairteiler app for solar electricity as well as the sustainability  
certification of Netz OÖ GmbH.  
The press was also greatly interested in Energie AG’s initiatives related to the continued  
development of the fibre-optic network and Energie AG Group’s involvement in the initiatives  
of the Province of Upper Austria that seek to provide the state’s population with high-  
performance internet.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
27  
Non-financial report Strategy and major sustainability issues  
STRATEGY 2030  
GRI 102-14, 103-1, 203-1  
Reliability in supply and waste management services  
In fiscal year 2021/2022, the turbulences on the energy markets and the continuing  
COVID-19 pandemic once again presented Energie AG with enormous challenges in  
warranting the uninterrupted operation of critical infrastructure (power plants, electricity and  
gas grids, telecommunication, water supply and waste management). In combination with a  
solid foundation built on the highest technical and organisational standards, the efficient  
work of the additionally established taskforce warranted a high level of supply security  
and supply quality. Energie AG Group faced particular challenges in this context as a result  
of the looming shortages in Europe’s supply with natural gas caused by the war between  
Russia and Ukraine. Energie AG therefore afforded special attention to the development of  
strategic concepts aimed at securing Upper Austria’s energy supply in the medium and long  
term. These efforts included an anticipatory procurement of the necessary gas quotas on the  
energy markets, the replenishment of the Group’s own gas storage facilities, and increased  
focus on renewable energies.  
Netz OÖ GmbH secures the energy supply in Upper Austria with a modern and reliable  
electricity and gas grid and is Austria’s pioneer in the by now completed roll-out of smart  
meter technology, making it the backbone of the supply infrastructure in Upper Austria.  
In addition to a high-performance grid infrastructure, the security of supply also depends on a  
secure and flexible energy output. The combined cycle gas-turbine power plant in  
Timelkam (CCGT power plant Timelkam) plays an important role in congestion management  
here, and in grid reserve management for transmission system operators. Energie AG’s own  
gas storage rights (or gas storage contracts) and subsidiaries support the high degree of  
flexibility. The gas storage capacities also serve the purpose of meeting the provisioning  
obligations pursuant to Article 6 (1) lit. c of the Gas-SOS-Regulation 2017/1938 in  
conjunction with § 121 para 5 GWG. Under these statutory provisions, Vertrieb GmbH as the  
supplier of protected customers is obliged to evidence the corresponding volumes in storage.  
The development and application of new technologies and intelligent system solutions for  
the integration of volatile decentralised electricity generation systems (PV, wind) and flexible  
consumer systems (battery storage, e-mobility, heat storage) is of particular importance as  
well. Together with partners from science and business, the project Underground Sun Storage  
2030 examines the role of hydrogen in extending the production of electricity from  
renewable sources from the summer into the winter months. Netz OÖ GmbH actively  
supports national research projects (e.g. Industry4Redispatch, System management 2.0). The  
participating experts are developing solutions that can accommodate the increasing  
requirements for system management, data exchange processes and active participation of  
additional market players in the electricity market.  
The Waste Management Segment › Page 134 guarantees solutions for hazardous and non-  
hazardous waste and recycling materials to the highest technological and ecological  
standards and, due to the two waste incineration plants in Wels and Lenzing, makes a  
significant contribution to waste management in Austria.  
The Energie AG Group has succeeded in establishing itself as a reliable drinking water, waste  
water management, space heating and hot water supply company in the Czech Republic  
Segment › Page 137. The Group intends to deepen its partnerships with municipalities while  
simultaneously boosting efficiency and competitiveness by making targeted investments in its  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
28  
Non-financial report Strategy and major sustainability issues  
own water, waste water and heating infrastructure as well as making constant upgrades to  
the Group’s equipment and vehicle fleet.  
Energie AG installs and operates a modern telecommunication infrastructure in Upper  
Austria and has been investing in the extension of future-proof fibre-optic technologies for  
around two decades. The Company’s goal is to advance the digitalisation and increase the  
attractiveness of Upper Austria for businesses and residents alike. The majority of public  
buildings in Upper Austria as well as many companies are already connected to the Group’s  
fibre-optic network. In the business with residential and small customer accounts, the past  
fiscal year witnessed a reorientation of the strategy for the FTTH development that aimed at  
combining and optimising the broadband activities in Upper Austria, more information can be  
found in the chapter headed Business model. › Page 16  
Digitalisation will offer Energie AG numerous future opportunities. The development of  
digital platforms will allow customers to benefit from new solutions. True to the motto of  
“secure digital services”, Energie AG is actively shaping Upper Austria’s digital future in  
collaboration with its customers and partners. Therefore key topics and objectives, and a  
corresponding roadmap have been developed and consistently implemented.  
Energy transition and circular economy  
The Paris Climate Agreement requires CO2 emissions to come down to almost zero (net  
value) by the year 2050. Austria has set itself the target of becoming climate neutral by  
2040. Successfully mastering the necessary transformation process in the energy system  
requires the political actions to focus on measures that are aimed at countering climate  
change as well as those that prioritise the competitiveness of the economy and security of  
supply.  
On EU level there are currently discussions about the wording of many of the existing  
directives, with the objective of achieving the higher CO2 reduction target of at least -55%  
over the period between 1990 and 2030 agreed as part of the Green Deal. Responding to  
the impact of Russia’s invasion of Ukraine on the global energy market and resulting  
turbulences, the European Commission moved to present the REPowerEU plan. The plan  
provides for a diversification of energy sources and acceleration of the transformation  
processes along with higher targets for the expansion of renewable energy and energy  
savings. The European Commission approved the financial assistance mechanisms of  
Austria’s Renewable Energy Expansion Act, with the relevant provisions entering force on 1  
January 2022. The decarbonisation of space heating is implemented by virtue of a law on  
heat from renewable energies, which postulates an end to fossil energy sources by no later  
than 2040. An amendment of the Environmental Compatibility Assessment Act (UVP-G) was  
the subject of consultations until September 2022. Among other issues, it is concerned with  
the identification of certain zones that are necessary for a rapid implementation of the energy  
revolution. These projects related to the energy transformation are of a particularly high  
interest in the public eye.  
Further information on the fundamental political and regulatory framework can be found in  
the Group Management Report, Energy and climate policy environment › Page 109 and  
Statutory and regulatory framework in the Grid Segment › Page 131.  
The national energy and climate targets for 2030 as well as the decarbonisation path to  
be pursued up to 2040 are a very challenging step towards the future energy supply in  
Austria. By using biomass, geothermal energy and industrial waste heat, the Energie AG  
Group has for many years pursued a consistent decarbonisation strategy in the area of  
heat supply and thus plays a pioneering role as a sustainable utility in its market sectors. From  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
29  
Non-financial report Strategy and major sustainability issues  
the perspective of Energie AG, it is relevant to take a holistic, integrated look at the entire  
energy system, taking into account the electricity and heat and mobility sectors (“sector  
coupling”), as well as a regulatory framework for the ramping up of green gases and  
hydrogen.  
In the area of electricity procurement, Energie AG has used its own 43 hydropower plants  
and corresponding rights to procure electricity generated from renewable energy sources.  
Fiscal year 2021/2022 witnessed Energie AG assuming the operational management of three  
hydropower plants owned by Wels Strom GmbH: Traunleiten, Breitenbach and the run-of-  
river power plant in Traunleiten. Energie AG Group also operates 84 PV plants (previous year:  
75) and holds interests in four wind farms with 13 wind power facilities across Austria.  
Energie AG supports the government’s programme for 2020-2024 by making sustainable  
strategic decisions. This includes the planning and implementation of a number of power  
plant projects in the areas of hydroelectric power, photovoltaic and wind power. This is part  
of Energie AG’s contribution to the climate and energy policy of the Austrian Federal  
Government, which is pursuing the goal of covering 100% of Austria’s total electricity  
demand from renewable energies – on balance over a year - by the year 2030.  
As a pioneer in the area of sustainable energy supply and partner for the energy  
transition in Upper Austria, the Energie AG Group endorses the energy and climate goals  
and supports them with concrete measures and projects: Environment › Page 47. Most  
Energie AG Group projects pursue the objective of advancing the use of renewable energy  
and improving energy efficiency on the one hand, while on the other hand reducing the  
consumption of resources and production of waste both within the Group as well as at the  
customer.  
In the interest of a sustainable waste management and circular economy, the operations  
of the Waste Management Segment are optimised by maximising the utilisation of synergy  
effects, additional resource conservation, and more efficient recycling processes, e.g. by  
further increasing the utilisation of waste heat (Wels waste incineration plant) as district heat  
for the town of Wels.  
Additional electricity generation from renewables until 2030  
The strategic goal of Energie AG Group is to provide 630 GWh of additional electricity from  
renewable energies produced by new and revitalised energy generation plants by the year  
2030. This will deliver savings of around 200,000 tonnes of CO2 (reference value = ENTSO-E  
Mix 2020).  
The expansion of electricity generation from renewable energies will make a significant  
contribution to the reduction and prevention of greenhouse gas emissions. 2,442 GWh of  
electricity from renewable sources were generated and 784,000 tonnes of CO2 saved in the  
fiscal year 2021/2022.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
30  
Non-financial report Strategy and major sustainability issues  
Energie AG will also be continuing to promote the sustainable use of waste, geothermal  
energy, industrial waste heat and renewable gases in heat production in the coming years –  
adding yet another element to the efforts to achieve a future characterised by renewables.  
In addition to these measures, what is also required to fundamentally transform the energy  
system is that the grid infrastructure is expanded quickly at all voltage levels, that additional  
storage capacity is created and that the gas/hydrogen grid is coupled with this sector and  
correspondingly integrated.  
The progressing expansion of electricity generation from renewable energies gives rise to  
additional challenges in safeguarding the security of supply. Particularly important is the  
continued safeguarding of the supply during times of low water levels, diminished solar  
power or phases of weak wind activity. To some extent, this can be achieved by a changed  
scheduling of production volumes with the help of new pumped-storage power plants.  
Additional power plants that can provide a high output over a longer period of time will  
however also be required. At the moment, this is mainly achieved with the help of gas power  
plants. In the long term, there are plans to operate these power plants with renewable gas  
and green hydrogen in particular. This is part of the EU’s energy strategy as well as national  
energy strategies, e.g. in Germany and Austria. Energie AG Group is investigating and  
monitoring the technological possibilities, including by means of participation in research  
projects. The further implementation does however require framework conditions that  
support a functioning business model.  
Focus on the customer  
Energie AG Group stands for high-quality, reliable products and services, which it  
continuously and consistently adapts to the needs and preferences of existing and potential  
customers. The strategic orientation of all organisational units of the Group is guided by the  
benefit offered to the customer. New innovative solutions aim at generating additional value  
for consumers, e.g. by creating special incentives for the purchase of environmentally friendly  
products or by digitally supporting their decision-making processes.  
In its business environment, Energie AG stands for sustainable and fair solutions, which it  
can guarantee on the basis of permanent process optimisation efforts. Despite wholesale  
prices increasing since 2017, existing residential and commercial customers alike were  
guaranteed stable prices for standard electricity products until 1 January 2023 (with the  
exception of residential/commercial electricity float prices). The stable prices are made  
possible by an expedient procurement strategy: for risk diversification and optimisation  
reasons, the procurement for these customers takes places on a very long-term “rolling”  
basis, which means equally distributed over various points in time, with the result of an  
average price and a smoothing out of peak price points.  
Starting in the autumn months of 2021, the prices for new customers were successively  
adjusted to match the higher procurements costs and changed market price levels. This is  
because even though Energie AG’s customers in Austria receive electricity from 100%  
renewable energies, they are nevertheless affected by the enormous price hike and price  
fluctuations on the European electricity market.  
As a result of the price guarantee, customer offers for standard gas products have also  
remained unchanged for many years, which was also made possible by the rolling  
procurement strategy described above. An adjustment to the new framework conditions for  
new customers was implemented in fiscal year 2021/2022. In the autumn of 2020, the  
prices for internet services were guaranteed for the first time. The price guarantee  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
31  
Non-financial report Strategy and major sustainability issues  
assumed until 1 January 2023 ensured that Energie AG Group once again positioned itself as  
a reliable and fair partner in the past fiscal year.  
Once the price guarantee assumed in the household and commercial sector expires, higher  
procurement costs will necessitate a price increase for the gas and electricity supply to  
existing customers.  
Customers ascribe responsibility to Energie AG Group in particular in the area of security  
and regionality. In both areas, Energie AG Group aspires to meet these expectations by  
developing and investing in renewable energies and the establishment of a sustainable  
circular economy. Turning to social responsibility, Energie AG contributes to the common  
good by providing ongoing support in the areas of health, education, sport, arts and culture  
as well as charitable and not-for-profit activities, also see the section headed Social  
Affairs › Page 75 and the section headed Employees › Page 87. Energie AG Group clearly  
showcased its solidarity by actively supporting customers affected by energy poverty, e.g. by  
means of goodwill offers.  
Safeguarding the legitimate interests of its customers is a top priority for Energie AG. This not  
only applies with respect to an ethically exemplary treatment of customers in accordance with  
the Group’s › Code of Conduct titled “This is how we think, this is how we act”, but also  
when it comes to the handling of personal data. Internal controls have been implemented  
to assure the Group’s compliance with the relevant regulations. An awareness campaign  
started in the autumn of 2019 has focused on raising employees’ awareness for the prudent  
handling of personal data and potential risks (cyber crime etc.). The campaign aims at  
increasing the awareness for information security among employees. A dedicated topic (e.g.  
data protection, phishing, social engineering) is presented in each quarter using a range of  
materials such as banners, flyers and e-learning sessions.  
Regional focus  
As the energy supplier for Upper Austria, the Energie AG Group has positioned itself as a  
strong regional partner for its customers and an important economic factor for the state. A  
high degree of regional value creation is achieved by the generation of energy in our home  
state, extensive investments in infrastructure projects across the state (expansion of electricity  
generation systems, fibre-optic network etc.) and the associated creation of jobs.  
Digitalisation provides an important impetus for the region. The Energie AG Group  
advances the development of pioneering technologies and uses them to increase the quality  
of its customers’ lives in their direct environment – e.g. by providing the means for a more  
efficient use of energy and extending the coverage of the fibre-optic network in Upper  
Austria.  
Similar to Austria, the water and heat markets in the Czech Republic are distinguished by a  
very regional structure. All services provided by Energie AG in the Czech Republic are  
rendered by seven regional and local water utility companies, five heat utility companies and  
one mixed water and heat utility company.  
Financial stability  
Energie AG’s financial goal is to achieve attractive returns, to sustainably secure the value  
of the Energie AG Group and to continue to be a reliable and interesting business partner  
for owners and investors in the future. Financial stability is supported by the balanced Group  
portfolio of liberalised and regulated business models. A further basis for success is the  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
32  
Non-financial report Strategy and major sustainability issues  
efficient management of risks and opportunities. It empowers the Group management to  
identify challenges at an early stage and to take effective measures in good time.  
The Group responds quickly to dynamic changes to the statutory framework, as well as  
market-based challenges stemming from changes in customer needs or competitors from  
outside the industry.  
Workforce  
Without motivated and committed employees, strategic goals are unachievable. The  
employees working at Energie AG are the Group’s most important resource. Energie AG  
prevails in the competition for talent by implementing a strategically coordinated recruiting  
process and succession management. The Group has also taken measures to further improve  
its reputation as a preferred employer.  
The Group’s successful apprenticeship programme trains the specialists needed by the  
Group’s business sectors and includes measures in the area of diversity that send an  
important socio-political signal.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
33  
Non-financial report Strategy and major sustainability issues  
SUSTAINABILITY OBJECTIVES  
GRI 102-14  
ECONOMY  
EMPLOYEES  
Ensuring sustainable financial stability  
Further development of employer branding with a  
special focus on promoting diversity (women in  
Securing the company value  
technical professions)  
Implementing innovative business models that  
Personnel and management development, as  
are fit for the future  
well as high-quality apprenticeship programmes  
Ensuring access to qualified personnel in the long  
term, in particular by positioning the Company as a  
family-friendly employer  
ENVIRONMENT  
Expanding renewable energy: +630 GWh by  
2030; company fleet of electric cars to rise to 40%  
by 2024  
COMPLIANCE  
Resource conservation  
Ensuring a value-conscious compliance culture  
Warranting an environmentally friendly and legally  
Preventing property damage and reputational  
compliant circular economy  
damage  
Ensuring fair competition by compliance with the  
law and regulations  
SOCIAL AFFAIRS  
Reliability in supply and waste management  
services  
Positioning ourselves as a responsible company  
Development and maintenance of sustainable  
relationships with customers  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
34  
Non-financial report Strategy and major sustainability issues  
SUSTAINABILITY OPPORTUNITIES AND RISK MANAGEMENT  
GRI 102-11  
Due to the rising importance of sustainability issues for commercial decisions,  
environmental, social and governance (ESG) aspects are becoming increasingly  
important factors in the risk management process. This task falls in the remit of the group-  
wide risk management system, which is taken with ascertaining and actively managing  
the arising risks at an early point in time. Opportunities and risks are events outside of the  
“ordinary” business activities that entail potential positive or negative consequences. For  
details on the Group-wide risk management and a description of Energie AG’s opportunities  
and risks, please see the Group Management Report › Page 119 and the Notes to the  
Consolidated Financial Statements, Management of risks and opportunities › Page 234.  
Based on international standards, the most significant effects of Energie AG’s activities on  
the issues resulting from the Austrian Sustainability and Diversity Improvement Act (NaDiVeG)  
were evaluated in an interactive process conducted together with the relevant business units.  
The opportunities and risks identified in this way were subjected to a qualitative assessment  
using a group-wide uniform assessment method. Opportunities and risks were presented as  
net risks and commensurate measures to reduce these risks were taken.  
The focus in the 2021/2022 fiscal year was on further developing the ESG risk management  
system. The activities pursued by other organisational units within the Group and their  
significant impact on matters regulated under the NaDiVeG were integrated into the group-  
wide ESG risk management system. This also included an “outside-in” evaluation of the  
issues that resulted in the inclusion of previously omitted risks and opportunities in the risk  
inventory of Energy AG Group. These are dealt with accordingly and are given due  
consideration within the strategy.  
The following table summarises the most important risks and opportunities that may  
arise from Energie AG’s activities in relation to the NaDiVeG, as well as the associated  
concepts, measures and relevant SDGs:  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
35  
Non-financial report Strategy and major sustainability issues  
SUSTAINABILITY AT A GLANCE  
GRI 102-11, 102-15, 102-16, 103-1, 103-2, 103-3  
Concepts, significant opportunities (+) / risks (-)1), measures and SDGs  
ECONOMY  
ENVIRONMENT  
PARTNERSHIP WITH EQUITY INVESTORS AND  
CLIMATE PROTECTION | RESOURCE  
OUTSIDE CREDITORS | BUSINESS MODELS FIT  
CONSERVATION  
FOR THE FUTURE – INNOVATION  
Concepts  
Concepts  
Consistent QSE management system  
Securing the company value by continuing a  
Group’s strategic goals for climate protection and  
sound financial and investment policy  
resource conservation  
Implementing innovative business models to  
Certified management systems  
safeguard the Group’s competitiveness  
Partnerships and cooperation projects  
Opportunities and risks  
Strengthening the Company’s resilience against  
Opportunities  
exceptional events (e.g. energy market  
turbulence, the COVID-19 pandemic)  
Efficient and environmentally friendly energy  
supply for society and the economy  
Increasing the use of new technologies  
(digitalisation)  
Resource preservation empowered by modern  
and sustainable technologies  
Contribution to achieving climate neutrality  
Opportunities and risks  
Risks  
see the Notes to the Consolidated Financial  
Regional ecological impacts on habitats,  
Statements, Management of risks and  
hydromorphology and biodiversity from the  
opportunities › Page 234  
construction and operation of facilities  
Local and global environmental impacts from  
increased emissions (greenhouse gas emissions in  
Measures  
particular)  
see the Group Management Report › Page 108  
Measures  
SDGs  
“Quality, Safety and Environmental (QSE)  
SDG 8: Decent work and economic growth  
Management” Group Policy  
SDG 9: Industry, innovation and infrastructure  
“Strategy Development Process” Group Policy  
SDG 12: Responsible consumption and  
“Company Cars and Their Private Use” Group  
production  
Policy  
Steady expansion of renewable energies  
Company fleet of electric cars to rise to 40%  
Legally compliant corporate management  
1)  
Risks/opportunities are defined as events outside of the “ordinary” business activities that entail potential negative/positive consequences; for  
Energie AG’s risks/opportunities resulting from the NaDiVeG, please see “Significant Opportunities (+)/Risks (-) and Measures” in the Notes to the  
Consolidated Financial Statements, Management of risks and opportunities › Page 234  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
36  
Non-financial report Strategy and major sustainability issues  
Increasing energy efficiency on the part of  
customers and within the Group  
Opportunities and risks  
Environmental impact assessments and analysis  
Opportunities  
reports  
High reliability in supply and waste management  
Reviewed and approved environmental  
services  
statements, certifications and audits  
Regional value-creation with infrastructure  
Use of modern and sustainable technologies  
projects and capital investments in infrastructure  
Crisis and emergency plans  
Support for social, cultural and sporting activities  
Rights management database  
New innovative products and sales channels for  
Management of official decisions  
customers  
Ensuring that the legally required staff  
Raising the awareness of children and adolescents  
appointments are made  
for an environmentally conscious consumption of  
Ideas management  
resources, electricity and water, as well as for the  
proper management and separate collection of  
“Code of conduct for contractors”  
waste  
Risks  
SDGs  
Potential negative effects on society, economy  
SDG 6: Clean water and sanitation  
and environment caused by malfunctioning  
SDG 7: Affordable and clean energy  
critical infrastructure (power plants, grid,  
SDG 9: Industry, innovation and infrastructure  
telecommunication, waste and water/waste water  
management facilities)  
SDG 12: Responsible consumption and  
production  
Potential negative effects from outages of critical  
infrastructure on information security, cyber  
SDG 13: Climate action  
security and data protection  
SDG 15: Life on land  
Regional consequences for the local population  
resulting from the construction and operation of  
facilities  
SOCIAL AFFAIRS  
SECURITY AND QUALITY OF SUPPLY |  
Measures  
CUSTOMER ORIENTATION AND SATISFACTION |  
“QSE Management” Group Policy  
REGIONAL RESPONSIBILITY | SOCIAL  
COMMITMENT  
“Sponsoring and Giving” Group Policy  
Investments into (grid) infrastructure  
Concepts  
Overhaul and maintenance work to ensure  
security (of supply)  
Consistent QSE management system  
Crisis and emergency plans  
Crisis management  
Group-wide organisational structures for the  
Group’s principles on democratic politics  
management of risks and opportunities  
Group’s strategic goals for security and quality of  
Customer forum  
supply, customer satisfaction and regional  
responsibility  
Proactive inclusion of stakeholders  
“Principles on democratic politics”  
Project-related communication with stakeholders  
Consideration of the interests of affected citizens  
beyond the scope prescribed by law  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
37  
Non-financial report Strategy and major sustainability issues  
“Guidelines for planning processes for new high-  
Family-friendly employer  
voltage routes”  
Risks  
Support for social, cultural and sporting activities  
Health and safety risks for company staff and  
Educational programme “Energie AG at School”  
temporary employees  
Ideas management  
Complaint management  
Measures  
“Code of conduct for contractors”  
“Human Resource Management” Group Policy  
› www.wir-denken-an-morgen.at  
“Management by Objectives” Group Policy  
also see measures in Compliance  
“Management Academy” Group Policy  
“berufundfamilie” audit for work-life balance  
SDGs  
“Workplace Health Promotion until 2019” seal of  
SDG 4: Quality education  
approval  
SDG 6: Clean water and sanitation  
In-house health management project  
energy@work  
SDG 7: Affordable and clean energy  
Dialogue with the employees’ representatives  
SDG 9: Industry, innovation and infrastructure  
Various employer branding measures for the  
individual target groups  
EMPLOYEES  
Personnel and management development  
Apprenticeship|trainee programmes  
ACTING AS A RESPONSIBLE EMPLOYER |  
Promoting diversity: “Women in technology jobs”  
WORKPLACE HEALTH AND SAFETY  
Trend monitoring  
Strategic succession planning  
Concepts  
Continuous development of the high work safety  
Comprehensive human resource management  
standards  
Management systems for health and safety in the  
Safety training courses for internal and external  
workplace  
employees  
Group’s strategic goals for positioning itself as a  
Work safety awareness campaign  
responsible and attractive employer, as well as for  
Introduction of sabbaticals  
health and safety at work  
Ideas management  
Cultural & sport events for the workforce  
Opportunities and risks  
Opportunities  
SDGs  
Safeguard and creation of jobs for skilled  
professionals within the region  
SDG 4: Quality education  
Economic contribution by providing education  
SDG 5: Gender equality  
and training  
SDG 8: Decent work and economic growth  
Long-term safeguarding of fitness to work and  
quality of life as a result of health promotion  
measures for the workforce  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
38  
Non-financial report Strategy and major sustainability issues  
COMPLIANCE  
RESPECT FOR HUMAN RIGHTS  
LEGAL COMPLIANCE AND PREVENTION OF  
LEGAL COMPLIANCE AND PREVENTION OF  
CORRUPTION  
CORRUPTION | SECURITY AND QUALITY OF  
SUPPLY | REGIONAL RESPONSIBILITY | ACTING  
Concepts  
AS A RESPONSIBLE EMPLOYER | CLIMATE  
Compliance management system and officer in  
PROTECTION & RESOURCE CONSERVATION  
place  
Concepts  
Information management system  
Group’s strategic goals for climate protection and  
Data protection management system  
resource conservation, security and quality of  
Whistleblower system  
supply, regional responsibility, and acting as a  
responsible employer  
Opportunities and risks  
Compliance management system and officer in  
Opportunities  
place  
Improving legal certainty  
Whistleblower system  
Fair and transparent contract award processes  
Opportunities and risks  
Transparency and reliability for customers  
Opportunities  
Risks  
Secure and reliable supply and waste  
Risks to fair competition caused by corruption and  
management in the interest of a high quality of  
violations of antitrust law  
life  
Risks to claims by customers and employees  
Positive effects on the region from regional  
under data protection law  
procurement  
Measures  
Positive effects on business partners and  
“Compliance Management System” Group Policy  
employees  
“Anti-corruption” Group Policy  
Risks  
“Capital Market Compliance” Group Policy  
Risks in the earlier links of the supply chain  
“Information Security Management” Group Policy  
cannot be entirely ruled out  
“Data Protection Management System” Group  
Isolated cases of discrimination  
Policy  
Measures  
“Data Protection Compliance Policy” Group Policy  
“Compliance Management System” Group Policy  
“Internal Control System (ICS)” Group Policy  
Works council  
Code of Conduct “This is how we think, this is  
Code of Conduct “This is how we think, this is  
how we act”  
how we act”  
“Code of conduct for contractors”  
“Code of conduct for contractors”  
Whistleblower instrument “Tell me”  
Whistleblower instrument “Tell me”  
In-person training and e-learning courses  
Procurement sourcing is geared to sustainability  
SDGs  
criteria and principles  
Training courses  
SDG 5: Gender equality  
SDG 8: Decent work and economic growth  
› www.wir-denken-an-morgen.at  
SDGs  
SDG 8: Decent work and economic growth  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
39  
Non-financial report Strategy and major sustainability issues  
QUALITY, SAFETY AND ENVIRONMENTAL MANAGEMENT  
GRI 102-11, 102-16, 103-3, 403-1, 403-8  
An integrated quality, safety and environmental management system (QSE) with a focus on  
sustainability and maximum efficiency is an integrated component of the management  
systems used by Energie AG Group. As part of the Company’s due diligence measures, the  
ISO 9001:2015 standard for quality management systems is applied as a Group-wide  
standard that contributes towards efficient design, continuous improvement and transparent  
presentation of operational processes and procedures.  
The governance risk compliance (GRC) management tool implemented in the  
2019/2020 fiscal year has now reached the planned scope of use. The processes of the Group  
companies (with the exception of the Czech Republic Segment) and their success factors are  
mapped in this GRC management system. The tool has been in use for internal and external  
audits including the associated action monitoring since fiscal year 2020/2021.  
There is at least one QSE liaison assigned to all applicable Group companies and holding  
units. These liaisons are responsible for operational implementation of the QSE management  
system.  
To ensure compliance with relevant environmental and occupational safety  
requirements, the entities that are not certified to ISO 14001:2015 and ISO 45001:2018 are  
guided by the historical values for the environmental management standards ISO 14001:2015  
and EMAS (“Eco Management and Audit Scheme”) as well as occupational health and safety  
according to ISO 45001:2018 from the already certified subsidiaries. 43.0% of employees at  
Energie AG Group are working in areas that are certified to ISO 45001:2018.  
The integrated QSE management system ensures the continuous improvement of the Energie  
AG Group’s services through the active involvement of executives, employees and customers.  
Regular examination from internal audits and by independent external and accredited  
certification bodies guarantees top product and service quality, as well as the best possible  
processes for customers and partners. The high quality of the QSE management system was  
also confirmed by TÜV Süd after a review audit between 22 April 2022 and 5 July 2022.  
All Energie AG units that have adopted these externally certified quality, safety,  
environmental and health management systems have processes to identify negative impacts  
on the environment and employee health, which can then be prevented or mitigated  
accordingly.  
All staff in Austria and northern Italy work at entities certified in accordance with quality  
management standard ISO 9001:2015. 28.5% of the Austrian and Italian workforce is  
employed at entities certified to environmental management standard ISO 14001:2015.  
Furthermore, 29.9% of employees in Austria are working in accordance with the Group’s  
environmental management system EMAS. The additional and specific standards ISO  
14001:2015 and EMAS were implemented for the Waste Management Segment, which  
accounts for 27.6% of employees in Austria, between 2010 and 2013.  
The Grid Segment is certified to ÖVGW QS GNB 200 (quality requirements for gas grid  
operators) and TSM P100 (technical safety management in electricity grids). The audit  
concerned industry-specific requirements pertaining to the assessment of gas and electricity  
grid operators with regard to the qualification and organisation of their technical units. Other  
certifications held by Netz OÖ GmbH include ISO 9001:2015 and ONR 192500:2011  
concerning the social responsibility of organisations (CSR). Netz OÖ GmbH has successfully  
solidified its leading position within the industry by gaining a new certification in  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
40  
Non-financial report Strategy and major sustainability issues  
fiscal year 2021/2022. Following intensive preparations and an audit phase lasting almost a  
full month, the company’s information security management systems (ISMS) was successfully  
certified to ISO/IEC 27001:2013. Parallel to the ISO/IEC 27001:2013 audit, all requirements of  
the Network and Information System Security Act (NISG) were co-audited by a qualified body,  
with the NISG audit report expected early in the 2022/2023 fiscal year.  
The Waste Management Segment is certified in the areas of quality (ISO 9001:2015),  
occupational health and safety (ISO 45001:2018), environment (ISO 14001:2015), and as a  
qualified waste management operator (RAEF). Energie AG Oberösterreich Umwelt Service  
GmbH (Umwelt Service GmbH) was the first nationwide waste management company that  
implemented the current version of the EMAS validation (Regulation [EC] No. 1221/2009) at  
all its locations back in 2013.  
The entities in the Czech Republic are not subject to the Energie AG Oberösterreich Group  
QSE management system. In accordance with the requirements of the respective subsidiary in  
the Czech Republic Segment, two Czech entities are certified in accordance with the  
international standards ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018. This means  
that just over two thirds of the employees in the Czech Republic work in entities that are  
certified under quality, environmental and occupational safety standards.  
The companies Gas- und Dampfkraftwerk Timelkam GmbH (GuD-Kraftwerk Timelkam  
GmbH) and the Group IT Services department of Business Services GmbH and Telekom GmbH  
are additionally certified in accordance with the information security management  
standard ISO 27001:2015.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
41  
Non-financial report Economy  
ECONOMY  
SDG 8, 9, 12  
GRI 103-1, 103-2, 103-3, 201-1 (Group Management Report, Consolidated Financial Statements), 203-2, EU DMA (formerly  
EU8)  
The sustainability objectives of Energie AG in the economic domain are:  
Ensuring sustainable financial stability  
Securing the company value  
Implementing innovative business models that are fit for the future  
Information on the economic position of Energie AG Group can be found in the Group  
Management Report, and at that location in the chapter headed Business Development in  
the Group › Page 112, Economic environment › Page 108 and Economic environment for  
the energy sector › Page 109 as well as in the Consolidated Financial  
Statements › Page 148.  
EU TAXONOMY  
The redirection of capital streams into sustainable investments is one of the objectives of the  
action plan for funding sustainable growth (“EU Action Plan on Sustainable Finance”). The  
Taxonomy Regulation came into effect in the middle of 2020 and serves as a uniform binding  
classification system that defines the economic activities in the EU that are deemed  
“environmentally sustainable”. The companies report on the outcomes of this classification  
on an annual basis. Accordingly, the non-financial reports of these companies include  
information on how and to what extent their activities are to be classified as environmentally  
sustainable.  
Based on the previously published regulations and delegated acts, an interdisciplinary project  
initially defined the economic activities within Energie AG Group that are to be classified as  
environmentally sustainable. In accordance with the Taxonomy Regulation, a  
differentiation was made between an economic activity’s taxonomy-eligibility and taxonomy-  
aligned. The reporting for fiscal year 2021/2022 requires information on whether an  
economic activity is described in the delegated act and thereby rendered taxonomy-eligible.  
For the two environmental goals “climate change mitigation” and “climate change  
adaptation”, the EU has published the delegated acts on sustainable economic activities  
within the meaning of the Taxonomy Regulation. The remaining four environmental goals are  
not yet applicable to Energie AG Group in the current fiscal year.  
According to relief granted by the EU, the reporting year 2021/2022 only requires Energie AG  
to disclose the proportions of the economic activities that are eligible and not eligible under  
the taxonomy in the sales revenues as well as capital expenditure and operating  
expenses. This consideration in principle includes all fully or partly consolidated subsidiaries.  
Owing to Article 8 no. 1 of the Taxonomy Regulation in conjunction with § 243b and/or §  
267a Austrian Commercial Code (UGB), application of the regulations under the  
Taxonomy Regulation is compulsory for Energie AG. As required under § 245a para 1 UGB,  
the Consolidated Financial Statements of Energie AG as of the closing date were compiled in  
accordance with the “International Financial Reporting Standards” (IFRS). The figures used to  
calculate the key figure for sales revenues, investments (capex) and operating expenses (opex)  
stem from the figures reported in the Consolidated Financial Statements.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
42  
Non-financial report Economy  
Based on a complete analysis of the company’s economic activities with respect to the  
environmental goals “climate change mitigation” and “climate change adaptation”, the  
proportion of taxonomy-eligible sales revenues, capex and opex in the respective total  
figures are stated in accordance with the Taxonomy Regulation for fiscal year 2021/2022.  
Identified economic activities within the meaning of the  
EU Taxonomy Regulation  
Economic sector according  
to the EU Taxonomy Regulation  
Material economic activities identified in the Energie AG Group  
Energy  
Electricity generation from hydroelectric power and photovoltaics  
Storage of electricity, transmission and distribution of electricity  
Heat generation from bioenergy, waste heat and district heat distribution  
Water supply, waste water  
Construction and operation of systems for water extraction, treatment and supply  
management and waste management  
Construction and operation of waste water collection and treatment systems  
Collection and transportation of non-hazardous waste  
Traffic  
Transport using passenger cars and light commercial vehicles  
On-road freight haulage  
Construction and operation of infrastructure for low-carbon road traffic  
Building industry and real estate  
Acquisition and ownership of buildings  
Installation, maintenance and repair of technologies for renewable energies  
Installation, maintenance and repair of energy-efficient devices and charging stations for electric vehicles  
Information and communication  
Data processing, hosting and associated activities  
The economic activity “electricity generation from wind power” is not included in  
Energie AG’s taxonomy disclosures because the wind power-related participating interests  
within Energie AG Group are not consolidated or only consolidated at equity.  
Sales revenues – definition  
According to the Taxonomy Regulation, the numerator only considers taxonomy-eligible  
goods or services that are produced or rendered directly by Energie AG Group. The  
proportion of taxonomy-eligible economic activities in the total sales revenues was  
determined as the proportion of sales revenues from goods and services that is associated  
with taxonomy-eligible economic activities (numerator), divided by Energie AG Group’s  
consolidated net sales revenues determined in accordance with the “International Accounting  
Standard” (IAS) 1.82 (a) (denominator) (also see the Notes to the Consolidated Financial  
Statements, Consolidated Statement of Income › Page 148). The proportion of Energie AG  
Group’s taxonomy-eligible sales revenues was 22% in the reporting period.  
Sales revenues  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
43  
Non-financial report Economy  
Investment expenditure (capex) - definition  
The key figure capex expresses the proportion of the investment expenditure that is either  
associated with a taxonomy-eligible economic activity or relates to the procurement of  
products and services from a taxonomy-eligible economic activity.  
The key figure capex is defined as the taxonomy-eligible investment expenditure (numerator)  
divided by the total investment expenditure for intangible assets, property, plant and  
equipment, and IFRS 16 leasing investments (denominator) (also see the Group Management  
Report, Business development in the Group › Page 112). 84% of the investment  
expenditure was defined as taxonomy-eligible in fiscal year 2021/2022.  
CapEx  
Operating expenses (opex) - definition  
The key figure opex expresses the proportion of the operating expenses within the meaning  
of the Taxonomy Regulation that is either associated with a taxonomy-eligible economic  
activity or relates to the procurement of products from a taxonomy-eligible economic activity.  
The key figure opex is defined as the taxonomy-eligible operating expenses (numerator)  
divided by the total defined operating expenses (denominator). The operating expenses are  
comprised of the expenses for research and development (R&D), expenses for maintenance  
and repairs, direct expenses in relation to the daily maintenance of assets, and short-term  
leases. 56% of operating expenses in the reporting period were classified as taxonomy-  
eligible within the meaning of the Taxonomy Regulation.  
OpEx  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
44  
Non-financial report Economy  
PARTNERSHIP WITH EQUITY INVESTORS AND OUTSIDE  
CREDITORS  
Continuing the sound financial policy aims at sustainably increasing the company value and  
the attractiveness of Energie AG Group for equity investors and outside creditors.  
Forward-looking initiatives such as pro-active liquidity assurance are aimed at warranting  
stability and resilience in times of crisis, as well as with respect to uncertain macroeconomic  
developments in Austria.  
Positioning the company as a reliable and stable partner for equity investors and outside  
creditors is an important goal of Energie AG Group. This goal is pursued stringently and  
sustainably by means of a stable dividend policy for our shareholders as well as a financial  
policy that places great importance on safeguarding a good and sustainably solid credit  
rating.  
The goal of the Energie AG Group is to generate an ROCE (Return on Capital Employed) that  
is higher than the WACC (Weighted Average Cost of Capital) value through consistent  
value-oriented corporate management and control. Energie AG Group primarily relies on the  
ROCE and the operating result (EBIT) for its internal management and assessment of the  
Group's earning power.  
The target for the long-term creditworthiness of Energie AG Group is a rating within the A  
group. In late February 2022, the international rating agency Standard & Poor’s again  
confirmed the creditworthiness of Energie AG with an ‘A’ rating (with a stable outlook). The  
analysts assessed the Group's stability and resilience in today's highly volatile and crisis-laden  
environment as particularly positive. For more than two decades, the Energie AG Group has  
had a credit rating by external experts as one of the top ranking European energy suppliers.  
As a result of the heavy turbulences on the European markets for energy and raw materials in  
combination with the associated potentially high liquidity requirements from the energy  
trading business, Energie AG in fiscal year 2021/2022 secured its liquidity by agreeing on  
additional – partly committed – lines of credit up to EUR 385 million with banks in Austria  
and Germany. This means that total lines of credit up to EUR 700 million are available to  
safeguard Energie AG's ability to take action even if markets were to become volatile in the  
future. Also see the Group Management Report, Funding and investment  
strategy › Page 114.  
The securing of long-term funding on the capital markets plays an important role, in  
particular for the financing of sustainable infrastructure projects for the expansion and  
renewal of hydroelectric power and photovoltaic plants as well as the expansion of the  
electricity grid in Upper Austria. The transformation toward a sustainable energy supply will  
require massive investment programmes from the entire industry over the next couple of  
years. The commercial successes enjoyed in recent years enable Energie AG to make a  
significant contribution to and actively participate in the energy transition.  
The Energie AG Group responds to the identified macroeconomic risks from turbulences  
on the energy market and the implications of the COVID-19 pandemic with efficiency  
improvement measures, a value-based investment management, and new business models  
aimed at harnessing additional earning potentials.  
The magnitude of value creation for the stakeholders is evident in a study from the 2018/  
2019 fiscal year, in which Economica-Wirtschaftsforschung determined the economic  
footprint of Energie AG. The study found the Group to have Austria-wide relevance with a  
total value creation of EUR 1.1 billion and more than 10,000 safe jobs. In Upper Austria,  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
45  
Non-financial report Economy  
2.1% of the region's gross domestic product and 1.3% of employments are directly or  
indirectly dependent on Energie AG.  
BUSINESS MODELS FIT FOR THE FUTURE – INNOVATION  
Research and development within Energie AG focuses on projects that cater to the strongly  
growing demand for digital services as well as the increased use of renewable energy  
sources. Energie AG warrants the practicability and demand-orientation of pioneering  
business models by involving the stakeholders as early as possible in the development  
process.  
Wertstatt 8 GmbH (Wertstatt 8) has been developing innovative solutions for the energy  
transition as an independent innovation company since 1 October 2019 with the goal of  
exploring the potential of different subject areas for future business models and placing an  
even stronger focus on the advancement of innovation-related activities. A dedicated  
innovation lab geared to the specific needs of innovation work was opened in December of  
2021. Wertstatt 8 is continuously developing new solutions that cater to individual customer  
requirements. Rapid learning and experimentation is used to work on innovative concepts in  
areas such as sustainability, the circular economy or energy. The open innovation approach  
is used to develop sustainable service proposals together with customers and external  
partners (e.g. Industry meets Makers (IMM), bizup, Energy Institute at Johannes Kepler  
University (JKU) of Linz, or industry partners from the network of Wertstatt 8 GmbH). To  
promote the dialogue with employees, Wertstatt 8 has founded an internal sustainability  
community in fiscal year 2021/2022.  
One of the solutions developed by Wertstatt 8, the › online heating adviser “HEINZI”,  
supports customers who need to renovate their heating system by recommending heating  
technology options in accordance with their individual requirements and preferences.  
“HEINZI” also provides information about the heating systems’ CO2 and fine dust emissions  
and supplies users with information about financial support for heating system replacements  
from the federal or state governments. Customers receive non-binding cost estimates and  
may request to be connected with specialist companies in the region who can support them  
in the practical implementation.  
Users who are interested in installing privately-owned PV plants are supported by Energie  
AG’s › “PV calculator”, which allows them to calculate the potential capacity and cost  
efficiency of their own PV plant. Energie AG thereby enables its customers to gain a quick  
overview of available options and receive suitable offers. Netz OÖ GmbH is the electricity grid  
operator for Energie AG and offers its customers a wide range of information and support in  
installing their own photovoltaic systems. In the fully automated approval process with the  
licensed electrical services companies, the latter also act as the point of contact for customers.  
Due to the sudden jump in applications in early 2022, Netz OÖ GmbH offered customers an  
extensive pool of information on its website at › www.netzooe.at/photovoltaik and also  
introduced online tools for customer support.  
In combination with a special new tariff model, the › “E-Fairteiler” app developed by  
Wertstatt 8 and launched in July 2021 enables groups of private electricity producers and  
consumers to distribute their internally generated PV electricity (peer-to-peer trading)  
within the group. The only prerequisite is a smart meter. Surplus electricity can be sold to one  
or several groups of other customers (without a PV system) at an individually set price. The  
price is set in the app by the group administrator. By joining the group, the individual decides  
whether or not they accept the set conditions. More features for the “E-Fairteiler” app are  
planned. As of 30 September 2022, 793 customers had already used the app. No new tariff  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
46  
Non-financial report Economy  
has been offered since the end of April 2022 as a result of the turbulences on the energy  
markets and the resulting difficulties in determining the price of electricity.  
Suggestions for improvement are solicited from all Energie AG’s employees on the  
“Loominati” platform – from small ideas about how to make savings to all-new business  
models. The most important asset for this to succeed is an innovative and highly motivated  
workforce, with staff able to play their part in the optimisation of operational processes and  
the ongoing development of the Group by sharing their ideas and expertise.  
Suggestions for improvements  
Unit  
2021/2022  
2020/2021  
2019/2020  
Ideas submitted  
Number  
130  
101  
121  
In the 2021/2022 fiscal year, this translated to 130 suggested improvements submitted by  
employees from all units within Energie AG Group in the form of a “Loominati” idea  
(previous year: 101).  
The regularly conducted digitalisation initiative “Neuland” is one of the measures taken to  
implement Energie AG’s digital strategy. Many pioneering ideas were once again received  
from Energie AG’s employees in the past fiscal year 2021/2022. The initiatives included, for  
the first time, a hackathon, which allows employees to program their own digital solution on  
the basis of Microsoft PowerPlatform. Competent IT coaches supported the team with  
training during the lead-up to the event as well as directly in the development of new apps  
and workflows that can make their daily work easier by digital means. This was accompanied  
by brief webinars that were offered to the employees in the form of twelve inputs over 30  
minutes each. A total of 482 staff members have used them for digital training. The  
PowerPlatform skills developed at the occasion of the hackathon represent solid knowledge  
that is added to the overall organisation and used sustainably for the development of other  
digital solutions.  
New technologies  
Energie AG believes that new technologies offer great potential for developing solutions for  
future challenges and harnessing opportunities in existing and new business areas.  
Accordingly, new technologies are afforded a high priority in the Group’s research,  
development and innovation activities. The works in fiscal year 2021/2022 included, among  
others, projects in the areas of decarbonisation, flexibilisation, safety, digitalisation and  
automation.  
For more information, see the Group Management Report › Page 108, Research,  
development and innovation › Page 120.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
47  
Non-financial report Environment  
ENVIRONMENT  
SDG 6, 7, 9, 12, 13, 15  
GRI 103-1, 103-2, 103-3  
Energie AG pursues the following environmental objectives:  
Steady expansion of renewable energy: +630 GWh by 2030  
Company fleet of electric cars to rise to 40% by 2024  
Resource conservation  
Warranting an environmentally friendly and legally compliant circular economy  
Energie AG’s major sustainability issues in the realm of the environment and sustainability are  
climate protection and the responsible, careful and efficient consumption of natural energy  
resources. They are covered in the section Environment, broken down according to the  
Segments Energy › Page 55, Grid › Page 65, Waste Management › Page 67, Czech  
Republic › Page 71, and Holding & Services › Page 72.  
Waste management is an integral element of the circular economy. Across the EU, statutory  
measures are being implemented to retain goods within the economic cycle and – aiming for  
the longest possible duration of use – ultimately assure their sustainable processing. The  
implementation of the measures and their impact are accompanied by EU-wide reporting  
that, among others, includes (volume) disclosures regarding waste handled and processing  
paths. Waste management plants that exceed a legal limit of waste volumes are made to  
comply with special conditions and reporting obligations. This concerns, for example, waste  
incineration plants and landfills.  
Regular internal and external audits are carried out as part of due diligence measures to help  
to ensure the necessary compliance with the environmentally-relevant statutory requirements.  
The full list of review findings can be found in the current environmental statements of  
› Umwelt Service GmbH and › Energie AG Oberösterreich Erzeugung GmbH (Erzeugung  
GmbH) for Timelkam.  
CLIMATE PROTECTION & RESOURCE CONSERVATION  
GRI 305-1, 305-2  
Energie AG is a steadfast supporter of the Austrian government’s climate policy. In addition  
to utilising and expanding electricity generation from renewable sources, Energie AG Group’s  
climate protection action is assisted by the principles of resource preservation and energy  
efficiency. The company takes measures aimed at increasing the energy efficiency of existing  
plants and systems and at the same time advises customers in the implementation of their  
own energy efficiency measures. It is implementing projects focused on decentralising the  
market that lay the foundation for the emergence and functionality of renewable energy  
communities and facilitate a sensible, practical future cooperation with these new market  
players.  
Projects aimed at reducing the internal consumption of resources, compensating for  
undesirable effects from the Group’s own operations on the climate and natural environment,  
as well as further improving the environmental footprint of Energie AG are being  
implemented.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
48  
Non-financial report Environment  
The measures aimed at raising awareness for the responsible treatment of energy resources  
among the population are complemented by (digital) information and advisory services as  
well as attractive financial assistance options.  
Emissions  
GRI 305-1, 305-2  
The Energie AG Group’s business activity requires a reasonable amount of greenhouse gas  
emissions. Thermal power plants are indispensable for electricity production as a means of  
ensuring a secure supply. Energie AG works to counter emissions by making substantial  
positive impacts on the environment through efficient low-CO2 energy and heat generation,  
and by harnessing the benefits of primary fuel and primary raw material substitution. In  
addition, the Waste Management Segment’s refrigerator recycling service makes a significant  
contribution to reducing greenhouse gas emissions.  
Fiscal year 2021/2022 accounts for the generation of 1,358 kt of direct CO2 emissions (Scope  
1; previous year: 1,099 kt), of which 1,184 kt are attributable to fossil energy sources  
(previous year: 923 kt) and 173 kt to biogenic energy sources (previous year: 176 kt). Energie  
AG Group accounted for 27 kt of indirect market-based CO2 emissions (Scope 2; previous  
year: 29 kt) and 101 kt site-based CO2 emissions (previous year: 120 kt). The variations in the  
previous year’s figures resulted from an improved data collection methodology and more  
precise process analysis.  
The Energie AG Group’s emissions predominantly come from the operation of thermal  
power plants, district heating plants, waste incineration plants and co-generation plants, as  
well as from pumping energy, distribution losses, process heat, building heating and vehicles.  
Calculation of CO2 emissions takes into account the Greenhouse Gas (GHG) Protocol  
Corporate Standards and the Global Reporting Initiative (GRI 305) Standards.  
Scope 1 encompasses direct emissions from the incineration processes of stationary and  
mobile facilities plus direct emissions from processes (CO2 and CH4).  
Direct greenhouse gas emissions are released when primary energy sources are converted  
in the Company’s facilities, vehicles and building heating. This includes all fuels such as  
natural gas, heating oil, diesel, petrol, liquefied petroleum gas and biogenic fuels. Energie AG  
creates electricity and district heating from these sources, allowing it to operate its own fleet  
of road vehicles.  
Scope 2 encompasses indirect emissions from electricity purchases and district heating. For  
Group units located within Austria, the generation mix of Vertrieb GmbH is used to measure  
the market-based CO2 emissions from electricity purchases. Electricity sales have been  
assigned the value of 0.00 g CO2/kWh since fiscal year 2020/2021. The Czech Republic  
Segment is measured at the average annual generation mix for the Czech Republic as per the  
“European Environment Agency”.  
Indirect greenhouse gas emissions are released by the use of electricity from the grid and  
heating from non-Energie AG systems. This includes the operation of systems that generate  
no electricity in-house, such as electricity supply to Energie AG buildings, grid purchases  
during system shutdowns/overhauls and pumped-storage electricity.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
49  
Non-financial report Environment  
CO2 emissions in tonnes per year  
Total direct (Scope 1) CO2 emissions  
2021/2022  
2020/2021  
2019/2020  
Total 1)  
1,357,555  
1,098,730  
1,217,676  
1) Previous years' values were restated due to improved data transmission.  
Direct (Scope 1) CO2 emissions, fossil 1)  
Business unit  
2021/2022  
2020/2021  
2019/2020  
Erzeugung GmbH  
626,386  
390,503  
491,328  
Waste Management Segment  
495,679  
468,552  
483,828  
Czech Republic Segment  
31,316  
33,561  
32,062  
Vertrieb GmbH  
25,567  
25,169  
23,966  
Netz OÖ GmbH  
3,188  
3,575  
3,395  
Business Services GmbH 2)  
1,978  
1,629  
1,714  
Total  
1,184,115  
922,990  
1,036,292  
1) The emission factors for fossil fuels were updated according to the values published by the Environment Agency Austria. Values for the global warming potential were taken  
into account over a 100-year timescale in accordance with the “Fifth Assessment Report” of the “Intergovernmental Panel on Climate Change” (IPCC AR5).  
2) Previous years' values were restated in fiscal year 2020/2021 as the improved data transmission resulted in a lower consumption of fossil fuels by Business Services GmbH.  
Direct (Scope 1) CO2 emissions, biogenic 1)  
Business unit  
2021/2022  
2020/2021  
2019/2020  
Erzeugung GmbH 2)  
8,203  
8,082  
6,693  
Waste Management Segment  
157,300  
160,046  
166,952  
Czech Republic Segment  
7,840  
7,502  
7,652  
Vertrieb GmbH  
96  
110  
86  
Netz OÖ GmbH  
0
0
0
Business Services GmbH  
1
0
0
Total  
173,440  
175,740  
181,383  
1) The emission factors for biomass and biogas were updated according to the values published by the Environment Agency Austria and the German Federal Office of Economics  
and Export Control (Bundesamt für Wirtschaft und Ausfuhrkontrolle).  
2) Previous years' values were restated for Erzeugung GmbH due to improved data transmission; a significant deviation was identified for biomass use.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
50  
Non-financial report Environment  
Indirect (Scope 2) CO2 emissions market based  
Business unit  
2021/2022  
2020/2021  
2019/2020  
Erzeugung GmbH  
12  
14  
4,310  
Waste Management Segment  
0
0
11,927  
Czech Republic Segment  
26,684  
29,005  
28,997  
Vertrieb GmbH 1)  
0
0
529  
Netz OÖ GmbH  
0
0
28,739  
Business Services GmbH  
421  
0
0
Total  
27,117  
29,018  
74,503  
Total Scope 1 + 2, market based (in t CO2eq)  
1,384,672  
1,127,749  
1,292,178  
1) Previous years' values were restated due to improved data transmission. The measurement of the contracting systems of Vertrieb GmbH was adjusted.  
Indirect (Scope 2) CO2 emissions site based  
Business unit  
2021/2022  
2020/2021  
2019/2020  
Erzeugung GmbH 1)  
5,758  
7,173  
7,841  
Waste Management Segment  
17,400  
21,814  
21,737  
Czech Republic Segment  
26,684  
29,005  
28,997  
Vertrieb GmbH 2)  
592  
960  
965  
Netz OÖ GmbH  
48,618  
61,404  
52,374  
Business Services GmbH  
1,797  
0
0
Total  
100,849  
120,355  
111,914  
Total Scope 1 + 2, site based (in t CO2eq) 3)  
1,458,404  
1,219,086  
1,329,590  
1) An improved data transmission resulted in a restatement of the emissions of the electricity input for Erzeugung GmbH in fiscal year 2020/2021.  
2) Previous years' values were restated due to improved data transmission. The measurement of the contracting systems of Vertrieb GmbH was adjusted.  
3) The values for the fiscal year 2021/2022 come from direct measurements, from environmental statements, or were calculated using conversion factors (for direct CO2  
emission factors see the Environment Agency Austria (Umweltbundesamt)). Conversion factors are used for the use/consumption of natural gas, petrol, diesel, liquefied  
petroleum gas, heating oil, methane, biomass, biogas and district heating, for example. The market-based approach was based on the Vertrieb GmbH generation mix and the  
generation mix of the Czech Republic. The site-based approach was based on the generation mix of Austria and the Czech Republic. The emission values from waste  
incineration (Waste Management Segment) are based on continuous measurements. Methane is included in the “direct fossil emissions”. The data of Umwelt Service GmbH  
(Waste Management Segment) has been collected for the calendar year 2021. For availability reasons, the data for buildings and the Czech Republic Segment is from the  
fiscal year 2020/2021. The following entities have not been included due to their small scale compared to the overall balance (< 1%): Trading GmbH, Telekom GmbH, the  
service areas (except Business Services GmbH) and Ennskraftwerke AG. The CCGT power plant in Timelkam is jointly owned by Energie AG (50%) and Groupe E (CH) (50%).  
The CO2 emissions are included at 100% in accordance with the operative controlling approach.  
CO2 emissions from electricity production  
The CO2 emissions from electricity production 1) have been reduced to 0.00 g/kWh since  
fiscal year 2019/2020 as a result of implementing the exclusive use of environmentally-  
friendly energy sources. This means that the customers of Vertrieb GmbH are supplied with  
CO2-free electricity.  
1)  
Fuel mix disclosure figures of Vertrieb GmbH excl. Energie AG Oberösterreich Businesskunden GmbH and Energie AG Oberösterreich Öko GmbH  
(Öko GmbH); the data for the CO2 emissions for the electricity production in the 2021/2022 fiscal year was not available at the time the report for  
2021/2022 was prepared.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
51  
Non-financial report Environment  
Electric mobility  
Energie AG emphasises its role as a paragon and pioneer in the area of resource preservation  
by enthusiastically endorsing electric mobility and alternative engine power. The share of  
Company-owned electric passenger vehicles (excluding the Czech Republic Segment) rose to  
54 vehicles in the 2021/2022 fiscal year (previous year: 39) and now represents 26.9%  
(previous year: 20.5%). The goal is to successively increase the share of electric cars in the  
Austrian fleet to around 40% by the year 2024. To achieve this objective, there will be a  
massive expansion of the internal charging infrastructure at existing and numerous new  
Energie AG locations in Austria. In fiscal year 2021/2022, Energie AG operated 152 charging  
points in Austria with 22 kW (previous year: 76), 1 direct-current rapid charger with 24 kW,  
as well as 2 rapid chargers with 2x75kW. The goal of expanding the charging infrastructure  
to 161 charging points at existing and numerous new sites by 2024 was overachieved.  
Internal charging infrastructure  
Unit  
2021/2022  
2020/2021  
2019/2020  
Charging points  
Number  
155  
76  
48  
Sites with charging infrastructure  
Number  
28  
23  
14  
Energie AG thereby supports the Austrian Government Programme 2020-2024, which  
provides strong impetus for public companies to switch their fleets to electric vehicles. The  
charging and operation of the vehicles with 100% renewable energy enables the Group  
to reduce CO2 emissions and the dependence on fossil energy sources.  
Energie AG’s charging card is the key to Austria’s largest charging network, giving customers  
a convenient way to charge their electric cars. A total of 2,480 charge cards were issued to  
date (previous year: 1,385). More than 9,100 electric car charging stations across Austria are  
provided by cooperation partners and can be used with the Energie AG charging card  
(previous year: 7,200). In Upper Austria, Energie AG has established a dense charging  
network to provide public and fast charging facilities for electric cars. A further expansion (in  
cooperation with municipalities and local partners) in different capacity categories is planned.  
The electricity supplied to all charging stations operated by Energie AG is to 100% sourced  
from hydroelectric power, wind and solar energy. Energie AG also offers charging solutions  
for densely populated residential buildings and company fleets. These solutions are geared to  
the charging requirements of the local target groups.  
In addition to charging solutions for private and business customers, the Energie AG Group is  
pursuing a targeted expansion of public charging stations – including operations  
management and service packages with local partners and municipalities – that is aimed at  
providing full-coverage supply to the general population. Energie AG currently operates  
164 publicly accessible charging stations (previous year: 128) with various output ranges from  
3.7 kW to 150 kW, including a billing system, and manages a total of 604 charging points  
(previous year: 425). As of the reporting date, rapid charging stations were in operation at  
13 sites (previous year: 8).  
E-mobility services  
Unit  
2021/2022  
2020/2021  
2019/2020  
Charging points that accept the Energie AG charge card  
Number  
9,100  
7,200  
4,500  
Public charging stations operated  
Number  
164  
128  
98  
Charging points managed  
Number  
604  
425  
257  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
52  
Non-financial report Environment  
Energy audit  
The energy audit, in line with § 9 of the Austrian Federal Energy Efficiency Act 2015  
(Bundes-Energieeffizienzgesetz), is conducted once every four years and covers all the Energie  
AG Group’s locations in Austria. The most recent energy audit was concluded in November  
2019 and the next audit will take place in fiscal year 2022/2023. The energy audit examines a  
key energy consumption area in the relevant sites’ ”processes“, which is analysed in detail  
and subsequently audited. These processes encompass operational processes and industrial  
facilities, e.g. electric drives and systems, as well as hot water systems used in industrial  
activities.  
Energie AG is continuously working on increasing the energy efficiency of its processes  
and also runs numerous campaigns that support its customers in making the switch to  
efficient devices and energy-saving illuminants. The switch to LED lighting was further  
advanced successively in fiscal year 2021/2022. The Waste Management Segment placed a  
particular emphasis on the energetic efficiency of grate firing and fluidised bed waste  
incineration plants. The expansion of district heat extraction from the waste incineration plant  
in Wels was completed in the summer of 2022. Additionally, the installation of a 50 kWp  
photovoltaic system at the Redlham site will provide the base load of this production site  
from renewable energies.  
Biodiversity  
The preservation of valuable habitats, biodiversity and water body morphology are essential  
aspects of project development at Energie AG. A wide array of environmental considerations  
are addressed during the approval process, especially for power plant construction.  
Energie AG is also implementing measures to improve ecological conditions and reduce  
the environmental footprint.  
Fish bypasses have been built at Energie AG’s run-of-river power plants and pumped-  
storage power plants in accordance with the Water Framework Directive.  
Fish bypasses  
Unit  
2021/2022  
2020/2021  
2019/2020  
Dams with fish bypasses  
Number  
26  
26  
25  
Dams without fish bypasses  
Number  
19  
19  
20  
In the “European Nature Reserve Lower Traun” and the Natura-2000 area “Lower Traun  
and Alm Valley”, a section of the embankment of the Traun river was adapted to the  
requirements for the rare habitat type “soft floodplain” (biosphere 91E0) in February of 2022.  
This delivered a supplementary environmental improvement to the efforts to preserve the  
biodiversity. Back in the winter of 2017/2018, measures were taken to stabilise the river bed  
with a special attention to the fish biosphere. These measures had a positive impact on the  
groundwater level and the overall condition of the floodplain at the Lower Traun river. A  
positive secondary effect is better flood protection for neighbouring communities.  
Energie AG holds more than 20 fishing rights in Upper Austria and Salzburg and not only  
supports the natural reproduction of the fish stock, but also secures the naturally authentic  
population density by means of ecological breeding programmes and regular stocking with  
native fish species.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
53  
Non-financial report Environment  
Resources  
Energie AG Group requires energy in various forms in order to operate its business activities.  
The administration buildings of Energie AG in Austria (excluding the Waste Management  
Segment) consume around 5 GWh for heating. The biggest source is district heat, which  
accounts for 42%. Other sources are gas (32%), electricity from heat pumps (13%), direct  
electricity (9%), and pellets (3%). The pure electricity demand is approx. 5 GWh. Photovoltaic  
systems installed at Energie AG sites in Austria (excluding the Waste Management Segment)  
generated 0.2 GWh of electricity in fiscal year 2021/2022.  
Energie AG exclusively uses 100% renewable electricity (excluding the Waste Management  
Segment) for the operation of its office, workshop and canteen buildings in Upper Austria.  
The sustainable consumption of resources has been a longstanding tradition in the  
management of Energie AG’s real estate assets in Austria.  
In fiscal year 2021/2022, the entire portfolio of real estate assets in Upper Austria (office,  
workshop and storage buildings) was analysed on the properties’ CO2 footprint. This  
analysis identified potential for optimisation, e.g. by replacing certain gas supply systems. Due  
to its size, the micro gas turbine at the Haid site has already been converted to district heat.  
Other revisions of the heating system aiming at an integrated energy concept as well as a  
wide range of measures to reduce the CO2 output are being analysed and will be  
implemented over the coming fiscal years. For the Waste Management Segment, the CO2  
footprint is recalculated on a yearly basis at the same time the environmental statement is  
prepared.  
The input materials needed for the Group to operate its business activities are procured by  
Energie AG’s centralised purchasing unit (with the exception of the Czech Republic  
Segment). This allows for an optimised allocation of resources and avoids the storage of  
reserves in selected areas.  
The office buildings in particular need an input of resources in the form of electricity, heating  
energy, paper and water. In fiscal year 2021/2022, the Energie AG Group’s sites in Austria  
consumed 18 t of paper for printers and copying machines (excluding the Waste  
Management Segment), which is 11.7% less than in the previous year and 30.1% less than  
in fiscal year 2019/2020. The digitalisation campaign means that more and more processes  
are being digitalised, which reduces the consumption of paper even further. The Energie AG  
Group’s sites in Austria mainly use paper that is FSC- (Forest Stewardship Council) and PEFC-  
(Programme for the Endorsement of Forest Certification) certified.  
The process to reduce physical mail started in fiscal year 2017/2018 is continuing. After  
switching to the digital inbox for correspondence from government authorities and automatic  
forwarding to the respective organisational units with the help of robotics technology, the  
future focus will increasingly shift to reducing the number of outgoing paper-based mail  
items. Efforts to further establish digital customer communications (invoice delivery, customer  
mail etc.) are ongoing. A targeted analysis of the senders of paper-based mail items (e.g.  
newspapers, catalogues, promotional and business mail) has already collected more than  
3,000 data records (exclusive of the Waste Management Segment) from across Austria.  
Coordinated efforts with the affected organisational units have resulted in a reduction of  
these mail items by around 70%, which translates into around 1,600 kg of paper-based mail  
that was not sent out. This process is evaluated and expanded on an ongoing basis.  
Thanks to ongoing digitalisation and the storage space optimisation project initiated in  
the 2021/2022 fiscal year, an impressive quantity of office materials was saved and recycled.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
54  
Non-financial report Environment  
Paper consumption  
Unit  
2021/2022  
2020/2021  
2019/2020  
Paper consumption  
t
18  
20  
25  
The reported paper consumption relates to the Austrian sites and excludes the Waste  
Management Segment.  
Water management  
In the thermal power plants, water is used as both an energy source (steam, warm water,  
cooling water) as well as process and cleaning materials. It is supplied from (company-owned)  
wells, running waters, and the public drinking water grid. The exhaust coolant water and  
waste water together with water from precipitation is pre-treated in accordance with the  
legal requirements. The hydropower plants use water for energy conversion.  
Both the extraction of process water from the underground and running waters as well as  
the infeed of waste water have been issued official permits. The use of water for electricity  
generation is also subject to approvals under the pertinent water management laws that  
must be renewed at certain intervals. This includes an assessment by the public authorities on  
whether the systems represent state-of-the-art technology.  
A rainwater utilisation system has already been installed in 2007 at Energie AG’s historic  
location in Gmunden. The rainwater cisterns supply the toilet facilities of the office and  
canteen building, the office tower of the adjacent building, and the carwash.  
In addition to using rainwater in Gmunden, Energie AG returns its household-similar waste  
water into the water cycle and carries out drinking water hygiene testing on an annual  
basis.  
A comprehensive water management has also been implemented for all technical plants  
that use waste input. The Waste Management Segment has made the environmentally-  
friendly extraction and return infeed of water one of its top priorities. The use of oil  
separators together with the taking and analysis of samples from waste water before being  
fed into the receiving water are integral elements in Energie AG’s operation of waste  
management plants.  
In fiscal year 2021/2022, the Waste Management Segment began covering an already closed  
landfill with a so-called water management layer. The layer consists of soil that has  
received a special treatment to reduce the infiltration of rain water into the landfill  
underneath.  
Employees in Austria (excl. the Waste Management Segment) whose workplace (field service)  
situation entitles them to a daily serve of mineral water will in the future receive freshly  
carbonised drinking water directly from the well or local water outlet of their respective  
support base. All taps used in the field offices in Austria (excl. the Waste Management  
Segment) will successively be retrofitted with a technical system that uses an activated carbon  
filter to purify, chill and carbonise drinking water using an active carbon filter. This will cut  
down on plastic packaging.  
Water that is extracted from the groundwater or a running water for being used as a heat  
medium (steam, warm water or cooling water) or as process water is usually treated  
(softened), ozone is added and the pH value is adjusted as required. Any waste water that  
exceeds certain legal limits is treated internally or externally before being fed into the  
receiving water or public sewer network.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
55  
Non-financial report Environment  
Internal waste management  
All waste generated internally, mainly consisting of waste from maintenance and  
servicing works to the generation plants, is separated by material and logged at each  
individual site (in accordance with § 10 Waste Management Act 2002). Recyclable waste (e.g.  
scrap metal, paper) are handed over to recycling companies.  
All other waste in Austria (ash from the biomass incineration Timelkam, slags from the waste  
incineration plant in Wels, scrap metal, workshop refuse, contents of oil separators, or  
flotsam arriving at hydropower plants) is handed over to a licensed waste collection and  
treatment company.  
Waste generated in tonnes 1)  
Unit  
2021/2022  
2020/2021  
2019/2020  
Non-hazardous waste (Austrian sites)  
t
2,794  
11,301  
1,186  
Non-hazardous waste (Waste Management Segment)  
t
125,961  
115,028  
117,827  
Hazardous waste (Austrian sites)  
t
202  
144  
118  
Hazardous waste (Waste Management Segment)  
t
1,260  
1,242  
2,143  
1) The volumes of the Waste Management Segment include, for the purposes of the EMAS certification, residual waste from waste incineration plants, e.g. slags, ashes and  
scrap metal. Waste generated by Energie AG Südtirol and RVL Reststoffverwertung Lenzing GmbH (RVL) are not included.  
ENERGY SEGMENT  
GRI 203-1, EU1, EU2  
Generation  
The program pursued by the Austrian government provides for a massive expansion of  
renewable power plants between now and the year 2030: The electricity generation is set to  
increase by 50% or 27 TWh, which will require the construction of many new hydropower  
plants, wind turbines and photovoltaic (PV) systems along with a moderate expansion of  
biomass.  
Energie AG’s generation unit is responsible for developing, building, operating and  
maintaining electricity and heat generation facilities and heat distribution systems.  
Energie AG is committed to using renewable energy sources in an environmentally  
friendly manner and is building and operating hydropower plants, thermal power plants and  
heat supply facilities, including with the use of biomass fuels. The Company is also committed  
to the expansion of wind power and photovoltaic power plants. Energie AG furthermore  
supports research into alternative electricity generation.  
Steady expansion of renewable energy  
The further expansion of the existing generation portfolio from renewable sources is a focal  
point of the strategic development. According to technical and commercial potential  
estimates, Energie AG Group has the capacity to generate 630 GWh of renewable  
electricity between now and 2030 by utilising new plants (hydroelectric power, wind power,  
and PV) and improving the efficiency of existing plants. Energie AG Group’s existing capacities  
will be increased by approx. 24% to around 3,250 GWh of electricity from renewable energy  
sources, also see Energie AG Strategy 2030, Additional renewable electricity generation  
until 2030 › Page 29.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
56  
Non-financial report Environment  
Achieving these very ambitious energy goals across all of Austria will require optimum  
framework conditions and the coordinated joint efforts of political and economic players as  
well as the general population. In addition to the streamlining and simplification of the  
environmental impact assessment and individual approval processes for energy generation  
systems, the necessary expansion of the electricity grid infrastructure for all voltage levels is  
an important building block for a sustainable future with regard to energy and climate  
protection.  
The increasing public acceptance of the expansion of renewable electricity generation is in  
stark contrast to the acceptance of concrete projects. Energie AG is responding to this  
development by establishing processes that facilitate the participation of the citizenry along  
with the concerned municipalities, neighbours and other stakeholder groups.  
Hydroelectric power  
Hydroelectric power is the most important pillar of Austria’s electricity supply. The  
nation has set itself the target of generating an additional 5 TWh from this energy source by  
the year 2030. The largest part of the electricity procurement in Energie AG’s power plant  
portfolio is also generated by hydroelectric power plants. Upper Austria has already reached a  
very high degree of resource utilisation of more than 90% in this area. The newly constructed  
power plant in Dürnau and the planned power plant in Traunfall, which will both replace  
older plants, as well as the power plant project in Weissenbach and other proprietary projects  
together with a production increase to the electricity procurement rights are intended to  
expand the capacity to harness the potential of clean electricity by the year 2030. The newly  
constructed replacement plant has tripled the output of the Dürnau power plant, which was  
commissioned in 2021, to 1.2 MW. The yearly electricity output of approximately 5.8 GWh  
can cover the demand of around 1,400 standard households. The Weissenbach project not  
only delivers environmentally friendly electricity but is also a valuable contribution to flood  
protection in the region.  
Storage expansion creates flexibility. In the future, the electricity supply in Austria will have  
to have an even greater capacity to store electricity and release it upon request at short  
notice. This is why Energie AG is advancing the implementation of the pumped storage  
power plant in Ebensee, which has already gained approval in the environmental impact  
assessment and is earmarked to significantly increase the security of supply with an output of  
up to 170 MW.  
The expansion of hydropower also depends on preserving the existing power plant  
capacities, which will require measures and regulatory processes aimed at maintaining the  
water rights. Environmental measures will be designed with an eye on minimising the loss of  
works water for hydropower generation. The expansion of hydroelectric power is partially  
necessary to compensate the production decline caused by the ever more stringent  
environmental requirements.  
Energie AG operates 43 of its own hydropower plants with a total capacity of around  
280 MW and around 1,160 GWh in standard production capacity (previous year:  
1,160 GWh). In addition, the Group holds procurement rights to run-of-river power plants  
along the Enns and Donau with a proportionate standard production capacity of around  
1,210 GWh as well to the pumped-storage power plant Malta/Reisseck II with a  
proportionate output of around 130 MW.  
The operational management of three hydropower plants of Wels Strom GmbH was  
assumed by Erzeugung GmbH on 1 January 2022.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
57  
Non-financial report Environment  
With its hydropower plants, Energie AG is an active player on the electricity market and also  
delivers important grid services, particularly including the supply of balancing energy.  
Ennskraftwerke AG, in which Energie AG holds a 50% interest, is investing around  
EUR 20.0 million into renovating the power plant in St Pantaleon, which is among those  
with the highest output capacity. Its full-scale renovation will contribute to increasing the  
electricity generation from hydroelectric power by the consumption of 1,800 standard  
households.  
The construction works on the new replacement hydropower plant in Traunleiten with an  
investment volume of EUR 48.0 million were completed back in 2020. The power plant is  
owned by Wels Strom GmbH, in which Energie AG holds a 49% interest. The operational  
management was assumed by Erzeugung GmbH. The power plant was constructed at the  
existing site with the greatest possible degree of care for the adjacent Natura 2000  
conservation area.  
Photovoltaics  
The expansion of photovoltaics will be implemented with the help of Group-owned PV  
plants, to be erected mainly on already contaminated sites such as landfills and  
decommissioned mining areas or on already used open spaces (e.g. SolarCampus in  
Eberstalzell) on the one hand, as well as contracted rooftop-mounted photovoltaic plants.  
Energie AG is progressing in accordance with the “Photovoltaic Strategy for Upper Austria  
2030”, which prioritises PV on buildings and inferior open spaces.  
Energie AG Group is operating 84 PV power plants (previous year: 75) with an output of  
approximately 18 MW (previous year: 14 MW) and a standard production capacity of  
19 GWh (previous year: 14 GWh). The PV plants in operation have a module surface of  
around 125,000 square metres (previous year: 100,000) and can produce the yearly electricity  
consumption of around 4,500 freestanding family homes (previous year: 3,500).  
In the last few years, the expansion of photovoltaic power enjoyed very strong momentum  
across all of Austria. Energie AG has extensive experience in this field and constructed the  
first research and demonstration plants several decades ago. An important milestone was the  
1 MW solar park in Eberstalzell commissioned in the year 2010.  
The expansion of the SolarCampus in Eberstalzell in the autumn of 2021 doubled the  
previous photovoltaic surface by adding 15,751 m2, with the result that the existing land area  
is now fully used for electricity generation. The use of significantly more powerful PV modules  
and their optimised installation delivered an total output increase to 4.32 MWp, which  
represents a four-fold increase of the average yearly electricity generation. Compared on the  
basis of the ENTSO-E Mix 2020, this saves more than 1,500 tonnes of CO2 emissions. Instead  
of the previous number of 300, the SolarCampus in Eberstalzell is now supplying around  
1,400 households with solar electricity from the region.  
Wind power  
Wind power facilities in Austria are predominantly installed in the more windy states of  
Lower Austria and Burgenland. In addition to the facilities in Munderfing, Upper Austria,  
Energie AG is also invested in wind power facilities located in the municipalities of  
Trautmannsdorf and Scharndorf in Lower Austria. Together with local partners, Energie AG  
Group owns interest stakes in four wind parks with 13 wind turbines (previous year: 13) via  
subsidiaries and thereby makes an active contribution to achieving the climate targets. The  
wind power facilities have a proportional output of around 15 MW (previous year: 15 MW)  
and a standard production capacity of around 36 GWh (previous year: 36 GWh). A new wind  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
58  
Non-financial report Environment  
turbine, which has been in trial operation since October 2022, was constructed in the wind  
park in Munderfing in fiscal year 2021/2022.  
Generation plants  
Unit  
2021/2022  
2020/2021  
2019/2020  
Hydropower plants  
Number  
43  
43  
43  
Total output  
MW  
280  
280  
280  
Standard production capacity  
GWh  
1,160  
1,160  
1,150  
Procurement rights from hydroelectric power  
MW  
380  
380  
380  
Procurement rights from hydroelectric power, standard production  
capacity  
GWh  
1,410  
1,410  
1,410  
Thermal power plants (locations) 1)  
Number  
6
6
6
Electricity output  
MWe  
400  
400  
400  
Standard production capacity  
GWh  
2,260  
2,260  
2,260  
District heating grid Austria  
Number  
12  
12  
12  
Heat contracting plants  
Number  
614  
607  
598  
Wind power facilities  
Number  
13  
13  
13  
Output  
MW  
15  
15  
15  
Standard production capacity  
GWh  
36  
36  
36  
PV systems  
Number  
84  
75  
71  
Output  
MW  
18  
14  
12  
Standard production capacity  
GWh  
19  
14  
13  
1) Previous years' values were restated from 7 to 6. The combined heat and power plant (CHP) in Attnang-Redlham was decommissioned in 2019.  
Proprietary electricity procurement  
2021/2022  
2020/2021  
2019/2020  
GWh  
%
GWh  
%
GWh  
%
Natural gas  
power plants  
1,015  
28.4  
465  
14.7  
688  
19.9  
Waste  
incineration  
120  
3.4  
118  
3.7  
128  
3.7  
Hydroelectric  
power  
2,232  
62.4  
2,381  
75.1  
2,433  
70.4  
Biomass and  
biogenic waste  
154  
4.3  
157  
5.0  
156  
4.5  
Wind power  
38  
1.1  
35  
1.1  
37  
1.1  
Photovoltaics  
18  
0.5  
13  
0.4  
12  
0.3  
Total  
proprietary  
procurement  
3,577  
3,169  
3,454  
Share of  
renewable  
energies  
2,442  
68.3  
2,586  
81.6  
2,638  
76.4  
In the 2021/2022 fiscal year, 68.3% of Energie AG’s proprietary electricity procurement came  
from renewable sources (previous year: 81.6%), with around 62.4% of this coming from  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
59  
Non-financial report Environment  
hydroelectric power (previous year: 75.1%) and the remainder from PV systems, wind power,  
biomass and biogenic waste. The reasons behind the declining share of electricity production  
from renewable sources are river water levels that are 12.1% lower than the long-term  
average (previous year: -6.1% lower) in combination with a more than doubling of the  
utilisation of thermal power plants as a result of the prevailing market conditions.  
Effects of climate change on the business model  
The Group’s business policy accommodates changes caused by the effects of climate  
change. This includes the monitoring of relevant studies that examine changes in  
precipitation and prolonged periods of drought in the catchment areas of Energie AG’s  
hydropower plants. A statistically significant change of the standard production capacity of  
the hydropower plants is so far neither apparent nor can it yet be assessed. The current  
volatility on the electricity markets (price volatility) greatly exceeds the economic  
uncertainty due to potential changes to the standard production capacity caused by climate  
change. The effects are distorted by the natural fluctuation of water levels and legal  
uncertainties that affect the generation of hydroelectric power. Energie AG responds to these  
uncertainties, e. g. with measures aimed at maintaining the best possible state-of-the-art  
technology for each individual power plant.  
Energie AG is prepared for a possible increase in the frequency of extreme events,  
particularly including flooding incidents. This concerns the operational management of the  
power plants and the weir operation regulations in particular. The most important measures  
and concepts have been coordinated with the relevant public authorities and are reviewed  
and updated regularly.  
The overall direction of the business strategy aims at increasing the proportion of  
renewable energy sources in the production of electricity and heat. In addition to  
expanding the systems for energy production from renewable sources, the Group is also  
advancing the development renewable energy storage. Electricity and heat generation  
systems that are based on non-renewable energy sources are, in particular, operated and  
further developed as necessary to warrant the security of supply.  
Need for flexibility in electricity production  
In addition to a high-performance grid infrastructure, the security of supply also depends on a  
secure and flexible energy output. After reaching the “100% renewables” target in  
electricity generation in the year 2030, the summer months are expected to deliver a clear  
surplus production of PV electricity. In winter, on the other hand, it is not possible to cover  
the higher electricity demand - mainly resulting from heat pumps, e-mobility and industrial  
electrification - due to the insufficient output of the PV and wind power plants. Forecasts  
expect the shortfall to amount to up to 9,500 MW for brief periods. “Backup capacities”  
from flexible CCGT power plants are needed to warrant the system stability during these  
months. The CCGT power plant Timelkam plays an important role in congestion  
management and as a grid reserve.  
In order to make flexible capacities available at short notice, which may be necessary due to  
forecasts that deviate from actual wind levels or solar irradiation, Energie AG is taking the  
next step toward realising the pumped-storage power plant in Ebensee, which has  
already been approved by the environmental impact assessment. The preliminary project will  
also include preparation of the final economic evaluation under energy criteria and the  
profitability calculation. Once the preliminary project has been completed, the Supervisory  
Board will be asked to make the final investment decision on the project. The demand for  
additional storage capacities until 2030 undoubtedly exists. Battery storage, e-mobility, and  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
60  
Non-financial report Environment  
managing consumer behaviour may be sensible additions from today’s perspective but fall a  
long way short of covering the total additional need for flexibility on their own. Maintaining  
the system stability requires synchronous and parallel support for the volatile generation from  
renewable sources by flexible “backup capacities” such as pumped-storage power plants. The  
appropriate regulatory and public funding framework will have to be put in place for these  
extremely capital-intense investments.  
The Ebensee site offers a range of significant advantages given its topography, the  
associated high degree of efficiency and the existing grid connection. Due to the economic  
environment for the energy sector, the project’s economic viability was not guaranteed up to  
now. Europe’s Green Deal, Germany’s plans to phase out coal and nuclear power, and  
Austria’s ambitious climate and energy strategy all mean that there is a growing need for  
more high-performance storage capacities and flexible solutions. Depending on the project  
development, the building permit might already be issued in fiscal year 2022/2023, the  
construction will then last around 4 years, which means that an optimum project execution  
will lead to a commissioning in the year 2027.  
Thermal power plants & district heating  
In terms of ensuring security of supply, Energie AG’s fleet of thermal power plants is  
playing an important role in the transition to clean and renewable energy. It can balance the  
volatile feed-in of renewable energy and acts as a reserve in the case of grid congestion.  
Biomass CHP plants also make an important contribution to the use of renewable energy.  
Energie AG has six locations 1) for thermal power plants with an output of around  
400 MWe and a standard production capacity of up to 2,260 GWh 2). The power plant with  
the highest output in Upper Austria is the CCGT power plant in Timelkam with an output  
of 405 MWe 3). It warrants the flexibility needed to guarantee the security of supply on the  
energy market and allows for a stabilisation of the electricity grid during congestion  
management. The Timelkam plant is particularly relevant to the Austrian control area  
manager with regard to the security of supply.  
The main inspection of the CCGT power plant in Timelkam and its upgrade to state-of-the-  
art technology took place in the autumn of 2022 and aimed at increasing the efficiency and  
reducing the consumption of natural gas. The output was increased to around 414 MWe. The  
conversion works will also see the installation of new furnaces and more advanced turbine  
blades, an increase of the incineration temperature, and adjustments to the cooling air.  
The last of the coal was burnt up at the Riedersbach power plant in 2016. Since then, only  
natural gas and biomass have been used to generate electricity and district heating at the  
Riedersbach and Timelkam sites. The biomass power plant at Timelkam (output:  
9.5 MWe, 28 MWt) uses forest and herbaceous biomass as well as biogenic waste in  
accordance with the Austrian Green Electricity Act to generate green electricity and district  
heating.  
All thermal electricity and heat generation plants of Energie AG exhibit a very high degree of  
fuel utilisation and, in turn, efficient use of primary energy resources.  
Conserving resources is more than simply a focus area in the operation of these plants; it  
begins as soon as infrastructure facilities are built and spans their entire useful life. The  
environmental impact of new production and supply facilities is kept as low as possible with  
the close involvement of affected stakeholders and the support of outside experts.  
1)  
Riedersbach, Timelkam, Wels, Kirchdorf, Steyr, Laakirchen  
2)  
Including Timelkam CCGT power plant (70%) and Riedersbach (location only)  
3)  
Timelkam CCGT power plant (100%)  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
61  
Non-financial report Environment  
A forward-thinking maintenance strategy ensures high system availability and maximises  
system lifespans.  
Increasing energy efficiency in electricity and heat production, distribution grids, and  
customers’ energy and water consumption is a permanent focus of efforts to achieve  
sustainability.  
The Group ensures that thermal power plants and heat generation processes remain  
environmentally friendly by using state-of-the-art practices, which are regularly reviewed both  
internally and externally. The use of combined heat and power (CHP), combined electricity  
and heat generation, plays an important role in improving efficiency. The heat is used for  
industrial process heating or district heating for the industrial sector, commercial applications  
and residential customers. Efficiency gains are also realised via environmental and other  
audits, maintenance and repairs, and via internal improvement processes as part of ongoing  
management efforts. The Group is continuing to expand the use of heat. Energie AG  
regularly obtains expert opinions to verify that its larger facilities are operating with high  
efficiency.  
Energie AG operates 12 district heating distribution networks (previous year: 12) and  
manages 614 heating systems under service contracts on behalf of customers (previous  
year: 607). A large share of the district heating is generated from highly efficient CHP  
(combined heat and power) plants and biomass power plants. As well as operating  
geothermal plants, the use of industrial waste heat is also increasing in importance.  
In October 2022, Energie AG teamed up with the Austrian Institute of Technology (AIT) and  
other partners in research and industry to start a research project that examines the  
assessment of geothermal resources in three areas in Upper Austria together with the  
potential utilisation of this heat in industrial operations as well as the local district heating  
networks.  
In yet another research project in cooperation with the Energy Institute of Johannes Kepler  
University in Linz (JKU) and other research and industry partners, Energie AG has launched a  
research project that investigates the development of interregional heat transfer  
networks that are supposed to link several industrial waste heat and other sustainable  
sources, district heating networks, industrial process heat and storage facilities with each  
other.  
This can be achieved through increased use of biomass and by “greening the gas”  
(blending natural gas with renewable gas, such as using methanation or hydrogen produced  
from renewables). Energie AG’s portfolio of power plants and district heat generation  
facilities provide a solid foundation for further developments in this area.  
Renewable heat  
In the area of heat, Energie AG has already initiated the switch to renewable energy through  
a number of projects over the past years. Until the year 2030, all of the measures combined  
will lead to a quota of 80% for sustainable, CO2-neutral heat generation from biomass  
with more than 260 GWh from biomass (Erzeugung GmbH, district heating networks  
Aschach, Freistadt, Pregarten, Weichstetten, Bioenergie Steyr GmbH and Energie Contracting  
Steyr GmbH), approx. 45 GWh from geothermal (GRB Geothermie Ried Bohrung GmbH and  
Geothermie-Fördergesellschaft Simbach-Braunau mbH), and approx. 40 GWh from industrial  
waste heat utilisation (Kirchdorf and Gmunden). The significantly expanded utilisation of  
waste heat in the waste incineration plant in Wels as part of the project “Future initiative  
electricity and heat supply Wels” allows for the current production of around 180 GWh to be  
more than doubled to around 390 GWh in the long term. The use of fossil fuels is reduced by  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
62  
Non-financial report Environment  
maximising the utilisation of heat from waste incineration. The strategy of densification and  
optimisation of the existing district heating networks is being continued. Additional  
waste heat sources will be evaluated between now and 2030, the heat used this way will be  
integrated into the district heat networks, making them even more sustainable.  
For more information about energy generation, see the Key performance  
indicators › Page 122 section of the Group Management Report › Page 108, as well as the  
Energy Segment › Page 124.  
Sales  
GRI EU DMA (formerly EU7)  
The energy savings that result from giving well-founded energy advice are a significant  
contribution to environmental protection and cost reduction efforts. Energy efficiency and  
advice have been among Energie AG’s core competencies for many years. Most of the  
Company’s customer advisers in Austria are certified “European Energy Managers” (EUREM)  
who can support their customers on-site, e.g. on trade fairs or in the business customer  
sector, on the basis of concrete analyses.  
As a provider of energy audits in accordance with the Federal Energy Efficiency Act that is  
registered with the National Energy Efficiency Monitoring Centre, Vertrieb GmbH and its  
wholly owned subsidiary Ingenieurbüro IfEA Institut für Energieausweis GmbH (IfEA) employ  
12 listed energy auditors (previous year: 12), making the Company one of the largest  
providers of this service in Austria. IfEA offers a wide range of other energy services for  
individuals and companies that seek to promote a sustainable and conscious consumption of  
energy and enable customers to benefit from easily accessible high-quality services. Energy  
performance certificates, thermograms, blower door tests, and heating monitoring are  
among the standard service offers. The IfEA supports businesses on their way to more  
sustainability and resource-efficiency by offering energy audits, energy advice for small and  
medium-sized companies, CO2 footprint and load profile analyses for electricity and natural  
gas, as well as optimisation concepts. Delivered in cooperation with an external cooperation  
partner, IfEA’s new › Fit4Green service creates significant additional value for customers. The  
focus is on energy efficiency, decarbonisation, development of a climate strategy and  
concrete implementation planning. It also includes a public funding strategy. A special  
campaign in 2022 aimed at raising the awareness for sustainability among the workforce by  
offering IfEA services at discounted rates.  
Vertrieb GmbH offers its customers CO2-free electricity labelling for residential and  
commercial customers. The energy mix amounts to 0 grams CO2/kWh. The fuel mix disclosure  
uses 100% renewable energy sources. Additionally, Öko GmbH is supplying municipal public  
and business customers with electricity that is certified with the Austrian Ecolabel UZ46. The  
Ecolabel distinguishes tariff models and products offered by green electricity traders who fully  
source their electricity from renewable energy sources and conform with clearly defined  
requirements and transparent criteria.  
Vertrieb GmbH also offers a CO2-reduced gas product, which contains biogas from the  
company’s own biogas plant in Engerwitzdorf. The biomethane plant in Engerwitzdorf  
supplied around 11.9 GW (previous year: 10.8 GWh) of renewable gas (biomethane) into the  
natural gas grid in fiscal year 2021/2022.  
For the most part, Energie AG supplies its electricity customers with electricity from  
environmentally friendly hydroelectric power. The following presentations of the energy mix  
of the product label “OÖ Wasserkraft”, and the product label “OÖ Ökostrom” of the  
Vertrieb GmbH relate to the 2020/2021 fiscal year 1)  
.
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
63  
Non-financial report Environment  
Fuel mix disclosure  
The majority of Energie AG’s residential and commercial customers use the product mix  
“Upper Austria hydroelectric power”:  
Upper Austria hydroelectric power  
Products “Ökostrom Klassik”, “Ökostrom Smart Nachtaktiv”, “Ökostrom Wärme”  
Figures as of 13 January 2022  
1)  
Fuel mix disclosure figures as defined by the Austrian Electricity Industry and Organisation Act (Elektrizitätswirtschafts- und -organisationsgesetz;  
ElWOG), § 78 onwards, were not yet available for the 2021/2022 fiscal year at the time this report was written.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
64  
Non-financial report Environment  
The product mix “Upper Austria green electricity” presents as follows:  
Upper Austria green electricity  
Product “Ökostrom Plus”  
Figures as of 13 January 2022  
Energy efficiency at the customer  
The Federal Energy Efficiency Act (Bundes-Energieeffizienzgesetz) of 2015 was to the  
largest part rescinded at the end of calendar year 2020. It took great effort for the Vertrieb  
GmbH to satisfy all requirements from the Act. The new Energy Efficiency Act and the  
requirements and obligations resulting from it are expected in the first half of 2023. Energie  
AG continues to engage in promotional funding and campaigns to encourage efficient and  
sustainable energy use.  
The products and services of the Vertrieb GmbH focus on advancing renewable energies  
and improving the energy efficiency at the customer. As a result, the portfolio is being  
extended and combined with public funding options offered by the Province of Upper  
Austria.  
Energie AG incentivises its customers to use energy efficiently in numerous ways. Around  
27,000 LED lamps were distributed to customers free of charge at the occasion of the  
regional roadshow in calendar year 2021.  
The household appliance exchange campaign promotes the replacement of old energy-  
hungry household appliances with energy-efficient new appliances. In cooperation with the  
network of partner stores, the number of customers who replaced one of their household  
appliances was increased in the year 2021. 845 old household appliances were replaced with  
more efficient new models (previous year: 743), 813 of them were in the white goods  
category (e.g. fridges, freezers, washing machines).  
The provisioning of heat accounts for a significant portion of the total energy demand of  
households in Austria and is the reason behind Energie AG’s support of various campaigns  
and initiatives that promote the replacement of old heating systems with state-of-the-art  
heating solutions. The advice Energie AG gives its customers in the form of energy advisory  
services is complemented by a continued push for energy-efficient heating with the help of  
heat pumps.  
In the year 2021, Energie AG partially funded a total of 394 heat pumps, of which 113 were  
in new buildings, 68 in renovated older buildings, and 197 in unrenovated older buildings.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
65  
Non-financial report Environment  
Funding was also made available to 16 projects that sought to replace hot water heat pumps.  
In the year 2020, this was comprised of 115 projects funded under the EEffG, 61 of them for  
new buildings, 45 for renovated older buildings, and 9 for hot water heat pumps.  
An additional funding option for heat pumps was made available in the campaign “Exit oil”,  
which supported the switch from old oil-fired heating systems to environmentally friendly and  
energy efficient heat pump solutions. The “energy saver package” campaign, which in past  
fiscal years supported the replacement of old heating systems with an efficient natural gas-  
fired condensing boiler, has not been actively promoted since the war between Russia and  
Ukraine broke out. In line with contractual terms, the campaign does however remain current  
until the end of 2022.  
Heat contracting solutions for efficient heating systems were another focus area. The  
increased use of biomass, geothermal energy and industrial waste heat is particularly effective  
in promoting regional and renewable energies in the production of heat.  
Energie AG has extensive expertise and experience in the area of photovoltaics. PV  
contracting solutions enable business and industrial customers to harvest the benefits of an  
environmentally friendly electricity generation from solar power without having to finance the  
installation of the system and take care of its operation. Vertrieb GmbH is operating a total of  
61 PV contracting systems for customers (previous year: 50) with an output of around  
9.9 MWp (previous year: 8.4 MWp) on the roofs of companies in Upper Austria. Other PV  
contracting plants at customers’ premises are currently under construction.  
PV contracting plants  
Unit  
2021/2022  
2020/2021  
2019/2020  
PV contracting plants  
Number  
61  
50  
51  
Output  
MWp  
9.9  
8.4  
8.4  
Energie AG promotes the expansion of roof-mounted PV plants by offering its  
customers the › “PV Superdeal”, which is a way of using a hire-purchase model to put a  
powerful, high-quality and individualised PV solution on the roof without the upfront  
investment. The focus is on PV plants up to 5 kWp for individual consumption; the unused  
electricity is either purchased by Energie AG, or traded peer-to-peer via a mobile phone app.  
In the B2B business, the contracting solution › “PV-Profideal”, which offers PV system  
packages from 10 to 80 kWp, was developed for commercial and agricultural customers as  
well as municipalities, associations and corporations. This provides strong support to the  
“Photovoltaic Strategy for Upper Austria 2030”.  
GRID SEGMENT  
GRI 203-1, EU3, EU12  
Netz OÖ GmbH is the electricity and gas grid operator in Upper Austria and parts of the  
states of Salzburg, Styria, and Lower Austria. The company also safeguards the operation of  
the electricity and gas grid. The yearly investments into grid expansion, retrofitting, and  
maintenance amount to more than EUR 100 million. These investments will assure a reliable  
and efficient energy supply for more than 575,000 electricity and gas customers. Netz OÖ  
GmbH understands that it is an important part of the public service in its supply area.  
Netz OÖ GmbH is committed to the sustainable treatment of the resources available to us as  
well as to exercising its social responsibility. This includes being actively involved in shaping  
the living environment of customers and laying the foundations for the measures that are  
needed to master the energy transition and combat climate change. This is why Netz OÖ  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
66  
Non-financial report Environment  
GmbH gained certification to ONR 192500:2011 “Social responsibility of organisations”  
(CSR) in the 2020/2021 fiscal year. The CSR goals are closely linked with the QSE  
management system of Netz OÖ GmbH. Regular internal and external audits review the  
compliance with the QSE and CSR standard.  
Netz OÖ GmbH publishes its Sustainability report on the company’s website: › Netz OÖ  
GmbH Sustainability Report.  
The integration of the mainly decentralised PV generation systems with approx. 589 MW  
installed capacity into the electricity grid entails a high capital expenditure for adapting the  
grids to the additional requirements in terms of capacities and grid-balancing capability.  
Taking Upper Austria’s goals for the expansion of renewable energies as a basis, far more  
than EUR 100 million in capital will be needed over the next 10 years. Thanks to local  
sourcing, more than half of this amount will generate additional value in Upper Austria.  
Important sub-projects that fall under the auspices of the “Electricity Grid Master Plan  
Upper Austria 2028”, e.g. the projects “electricity supply Almtal and Kremstal” and  
“electricity supply Pramtal south” and the new Hörsching substation have already been  
completed. Other projects are currently in the implementation or planning phase. All projects  
pursue the objective of warranting a reliable and secure electricity supply in Upper Austria.  
In light of the expected massive expansion of e-mobility and decentralised systems for  
electricity generation from renewable sources, the low and medium voltage grids will also  
have to be expanded in the years ahead.  
Between now and 2027, around EUR 55.0 million will be invested into the gas grid, which is  
needed to support sector coupling and integration. Investments into this grid are necessary  
notwithstanding the planned exit from fossil energy sources due to the fact that these grids  
can also transport and distribute green, climate-neutral gases such as organically or artificially  
produced biomethane or hydrogen.  
In addition to the measures focusing on security and quality of supply, the distribution grid  
operator plays an important role in the implementation of the (renewable) energy  
communities (measurement and provision of measurement values for the settlement of the  
consumption within the community and its members etc.).  
Grid losses  
Unit  
2021/2022  
2020/2021  
2019/2020  
Electricity grid losses  
GWh  
222  
238  
203  
Electricity grid losses  
%
2.7  
2.8  
2.6  
Gas grid losses  
m3  
10,798  
31,367  
26,533  
Gas grid losses in CO2  
t
217.69  
632.36  
534.91  
Grid losses are an indicator for the efficiency of energy supply grids and thereby for the  
preservation of resources during energy transportation. The use of low-loss, high-efficiency  
transformers in grid renovation as well as energy-efficient control, regulation and  
transportation systems contribute to the further reduction of grid losses.  
In the 2021/2022 fiscal year, the losses in the electricity grid amounted to 2.7% or  
222 GWh (previous year 2.8%/238 GWh). The gas grid losses caused by venting (cold  
flaring) for repairs and maintenance works amounted to 10,798 m3 in the  
2021/2022 fiscal year (previous year: 31,367 m3). The gas grid losses correspond to 217.69 t  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
67  
Non-financial report Environment  
of CO2 (previous year: 632.36 t of CO2). Due to the number and nature of the projects in  
comparison to the previous year, the venting quantity has declined greatly.  
Use of land  
Electricity and gas are grid-bound energy sources. The supply with electricity and gas  
depends on the availability of the necessary grids and transportation systems to the  
consumers. As a grid operator, the company needs to secure the right to use the necessary  
land parcels for cables and overhead lines that are needed for the electricity grid and for  
pressured pipes for the gas grid. The company prioritises the use of public land for grids that  
ensure the energy supply (in the public interest) whenever possible. In most cases, however,  
such land for the erection and construction is not sufficiently available. This means that it is  
necessary to use land owned by third parties.  
In order to keep concerns to a minimum, the company already affords maximum  
consideration to the settlement structure and neighbours during the planning phase. In  
most cases it is possible to reach mutual agreement with regard to the utilisation of land for  
the erection of the necessary energy systems. The compulsive registration of an easement  
that allows the use of land in the public interest of assuring the energy supply is only a  
measure of last resort in cases where this is not possible.  
Social responsibility at Netz OÖ GmbH  
Netz OÖ GmbH has prepared an ESG risk analysis in the area of gas and electricity that  
examines issues related to social affairs, environment, work, and customers. These issues  
were assessed with respect to the ensuing opportunities and risks for Netz OÖ GmbH.  
Success factors have been developed for all important core CSR issues of Netz OÖ GmbH and  
allow for the achievement of strategic business objectives and the sustainable improvement  
of the product and service quality. The new requirements were integrated into the quality  
management system of Netz OÖ GmbH and are observed in all core activities. Yearly  
internal and external audits verify the effectiveness of the quality management system.  
Netz OÖ GmbH is firmly committed to the major sustainability issues of the Energie AG  
Group. Dedicated sustainability topics were developed for a more specific presentation of  
Netz OÖ GmbH together with quantitative and qualitative key performance indicators to be  
measured were set in the form of success factors based on these issues. The business  
activities of Netz OÖ GmbH are focused on a positive development of the major  
sustainability issues and are monitored yearly on the basis of dedicated success factors. The  
following significant major sustainability issues were compiled: security and quality of supply,  
responsible treatment of third-party property rights, customer orientation and satisfaction,  
innovative services to support social developments, workplace health and safety, climate  
change mitigation and resource preservation, legal compliance and prevention of corruption,  
acting as a responsible employer, regional responsibility, and safeguarding the company  
value.  
Netz OÖ GmbH has already implement numerous projects that align with the principle of  
sustainability and socially responsible action over the past years, e.g. in the area of storing  
solar electricity in the gas grid and protecting nature and living creatures (bird protection  
project: a substation is turned into a semi-natural habitat for animals). All reports on the  
above and ongoing projects can be found on the homepage of Netz OÖ GmbH  
( › www.netzooe.at/nachhaltigkeit).  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
68  
Non-financial report Environment  
WASTE MANAGEMENT SEGMENT  
GRI 306-1, 306-2, 306-3  
The Waste Management Segment handles a total waste volume of around 1.6 million  
tonnes a year (previous year: 1.7 million t) at 24 facilities. Due to modern logistics and the  
extensive network of facilities, this waste is collected, treated, incinerated or disposed of in a  
commercially and environmentally state-of-the-art process. The market for waste  
management is subject to permanently changing general conditions.  
The careful use of resources and prevention or reduction of emissions with the active  
involvement of customers, employees, and owners as well as their level of satisfaction are  
fundamental prerequisites for the Group’s long-term success. To guarantee customer focus  
and rapid service, the Waste Management Segment operates at various sites across all of  
Austria.  
The environmental targets of the Waste Management Segment are stated in the current  
› environmental declaration 2022 pursuant to EMAS.  
The Waste Management Segment always strives to find new ways of disposing waste that  
work hand in hand with the circular economy. A comprehensive and integrated back-to-  
back circular economy is only made possible by uncompromising changes in the product  
design to be adopted by the manufacturers.  
The majority of the handled waste volumes is processed in Group-owned treatment and  
recycling plants and then returned on the market or used for electricity or heat  
generation. Investments into the highest technical standards and in environmental  
protection are one of the foundation stones of the Waste Management Segment’s business  
activities.  
Waste management services are always provided with an eye on preserving and  
substituting fossil fuels as much as possible. Key plans in this area include reducing CO2  
emissions with a modern fleet of trucks, rolling out e-business (automating commercial  
processes), increasing energy efficiency and decreasing overall energy consumption.  
The recycling of the residual slag from waste incineration at Energie AG’s Wels plant has  
been ongoing for more than 10 years. About a quarter of the input mass remains after the  
incineration process in the form of inert residual substances (slag) that also contain various  
types of metals. In a multi-stage mechanical separation process using a mobile treatment  
plant, ferrous and non-ferrous metals remaining in the slag after incineration are extracted.  
These raw materials (aluminium, copper, brass and stainless steel) are separated, recycled and  
returned into the metal processing cycle to replace primary raw materials, which also saves  
CO2 emissions in comparison to primary production. The recycling of the metals additionally  
reduces the use of the landfill in Wels and thereby prevents the need to use other landfills  
and the associated truck journeys and fuel consumption.  
Biomonitoring, a scientifically-based control method, is used to track pollutant  
emissions at the Wels waste incineration plant. The effects of the thermal treatment plant’s  
operation on the environment are measured continuously at several fixed points in and  
around the site.  
In terms of energy efficiency in the Waste Management Segment, the Group pays particular  
attention to the energetic effectiveness of the grate firing and circulating fluidised-bed  
waste incineration plants. Compliance with the efficiency criteria under Directive 2008/98/EC  
is assessed on an annual basis. Efficient electricity conversion and/or heat extraction are  
crucial factors in fulfilling these criteria. As far as technically possible, process water, rain  
water or seepage is used instead of potable water in the production plants.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
69  
Non-financial report Environment  
In order to keep the waste incineration plants up to date with the latest technology and  
warrant an uninterrupted security of waste management, the waste incineration plants  
are regularly inspected with a focus on the replacement of bigger system components.  
A key objective of the Waste Management Segment lies in compensating for emissions  
caused by own plants and reducing the consumption of resources. The Segment’s CO2  
footprint was determined in the 2019/2020 fiscal year in cooperation with the Environment  
Agency Austria and forms the basis for the climate change mitigation strategy that the waste  
management sector is implementing in order to achieve CO2 neutrality. According to  
Environment Agency Austria, the direct and indirect emissions amount to a total of 530,000 t  
of CO2eq (resulting from the operation of incineration plants, logistics, electricity  
consumption etc.). Around 60% of these emissions are already directly compensated by the  
services provided by the Umwelt Service GmbH, e.g. by the production of substitute fuels and  
the recycling of waste materials to secondary raw materials. Additionally, the generation of  
electricity and district heat in the waste incineration plant in Wels generates a theoretical  
prevention potential of around 250,000 t of CO2eq for the Umwelt Service GmbH.  
Based on the insights from the investigation conducted by Environment Agency Austria, the  
Umwelt Service GmbH is now implementing additional projects within the climate change  
mitigation strategy. The focus of these projects is on the switch to electric vehicles and the  
in-house generation of electricity from photovoltaics. The positive development of these  
projects with respect to the CO2 footprint is monitored continuously.  
The site in Wels with its two waste incineration plants is not only the centre piece of the  
waste solution for Upper Austria, but also a hub for many waste management activities  
within Energie AG Umwelt Service GmbH. In Wels, Energie AG makes a positive contribution  
to the circular economy and climate protection by returning humified organic substances and  
nutrients to the natural cycle by means of pre-treated compost materials. The compost  
material of Energie AG is of quality class A+, which means that it can not only be used for  
soil maintenance with fruits and vegetables, but also for the establishment of new vegetation  
and lawn areas.  
All of the Waste Management Segment’s departments with centralised functions were  
consolidated in Wels in fiscal year 2021/2022.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
70  
Non-financial report Environment  
Total waste volume in tonnes 1)  
2021/2022  
2020/2021  
2019/2020  
By waste type  
Non-recyclable waste  
1,196,742  
1,298,784  
1,280,717  
Paper  
197,651  
211,231  
218,973  
Plastics & packaging  
46,444  
47,677  
50,650  
Glass  
54,538  
54,409  
55,406  
Organic waste  
56,701  
58,981  
59,820  
Metals  
23,240  
30,156  
25,796  
By hazardous substance  
Hazardous waste  
98,164  
100,540  
94,304  
Non-hazardous waste  
1,477,151  
1,600,697  
1,597,059  
By waste management method 1)  
Recycling  
567,685  
639,077  
616,703  
Incineration  
High-caloric  
49,629  
54,880  
57,508  
Medium-caloric  
909,762  
943,282  
955,981  
Low-caloric  
Landfill  
48,240  
63,998  
61,170  
1) The waste management method relates to the prevalent waste management method after waste generation. The total waste volume of the Waste Management Segment also  
includes the volumes from Energie AG Südtirol Umwelt Service GmbH, reporting changed with retroactive effect from financial year 2019/2020.  
Example 1: So-called non-recyclable waste is generated in private households. The first treatment stage takes place at the waste incineration plant. The incineration produces  
residual substances that are then processed in additional steps. The subsequent processing steps are disregarded as the waste volumes are significantly smaller than the  
originally produced residual waste.  
Example 2: batches of separately collected packaging materials (such as paper, glass, plastic) always contain wrongly discarded packaging materials. A sorting machine  
separates these misplaced materials from the recyclable materials. The by far biggest portion of the waste materials can be recycled. As a result, the collected paper, plastic  
and packaging materials as well as glass items come under the recycling category in terms of their disposal method.  
Internal audits guarantee the process control with respect to legal compliance with  
environmental regulations. This focuses on the Austrian Legal Information System, monitoring  
of requirements (laws, regulations, administrative decisions) in the Gutwin legal database and  
ensuring that waste is obtained and stored legally. In addition, the externally certified  
environmental management system guarantees that negative impacts of processes on the  
environment are identified and can then be prevented or mitigated accordingly.  
Water supply and waste water management services  
The Waste Management Segment also offers water supply and waste water  
management services to cities and municipalities across Austria. In fiscal year 2021/2022,  
the Waste Management Segment, via WDL-Wasserdienstleistungs GmbH, supplied around  
130,000 persons with approx. 9.0 million m3 of drinking water that is sources from wells in a  
number of waterworks and delivered to the customers (municipal customers) at defined  
transfer points.  
No noteworthy water losses occur within the transport pipe network, which is owned by  
the Waste Management Segment. The differences between the measuring points at wells or  
tanks and water meter chambers at the customer’s end fall within the range of the water  
meters’ measurement tolerances.  
Energie AG only has limited influence over water losses in the distribution networks of the  
municipalities serviced, as the municipalities who own the infrastructure in these areas have  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
71  
Non-financial report Environment  
the power to decide on any measures (upgrades, investments, etc.). Energie AG carries out  
monitoring, measurements and broad-based analysis and formulates proposed measures for  
decision-makers to reduce non-revenue water.  
CZECH REPUBLIC SEGMENT  
In the Czech Republic, Energie AG is pursuing two different operational models on the water  
and waste water management market. The operator model is defined as the public sector  
(cities, municipalities, communities) owning the infrastructure and outsourcing its operation  
by means of awarding long-term contracts (concessions, leases, leaseholds). In the asset  
owner model, Energie AG both operates and owns the infrastructure.  
Energie AG’s Heating business unit is supplying district heat and warm water to residential,  
commercial and industrial customers in the Czech Republic. The supply is, for example,  
supported by cogeneration units and biomass heating plants as well as industrial exhaust  
heat.  
The activities in the Czech Republic are illustrated using the key figures below.  
In fiscal year 2021/2022, the Czech Republic Segment supplied just short of 1 million people  
with approx. 49.2 million m3 of drinking water (previous year: approx. 48.2 million m3) and  
provides waste water management services to around 700,000 residents with around  
45.2 million m3 waste water (previous year: approx. 45.1 million m3). Given that local  
authorities are responsible as the owners for renovating networks (except for one  
investment – VaK Beroun a.s.), Energie AG’s measures focus on locating and repairing leaks.  
In recent years, extensive investments have been made in modern hardware and software for  
hydraulic network modelling, as well as in expanding district metered areas, supplying  
equipment and providing employee training.  
The measures taken in response to the turbulences on the European energy market in  
fiscal year 2021/2022 include, for example, a distribution of the procurement risks among a  
number of suppliers and an intensified monitoring of the development of energy prices. The  
supply of residential, commercial and industrial customers in the Czech Republic with  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
72  
Non-financial report Environment  
drinking water and waste water management services was, despite the impact of the war  
between Russia and Ukraine, assured at all times in fiscal year 2021/2022.  
A benchmarking in accordance with the internationally accepted “unit water leakage”  
method paints a positive overall picture for the 69 supply areas (previous year: 52) that each  
have a population of more than 5,000. In fiscal year 2019/2020, 92% of the networks were  
in good condition, 6% in average condition and 2% in poor condition. For the  
2020/2021 fiscal year, these values have changed to 88% in good condition, 9% in average  
condition and 3% (representing two municipalities) in poor condition.  
The business area “Heat” in the Czech Republic Segment supplies over 80,000 residents  
with district heat (previous year: 50,000) and provides installation services for municipalities  
and private customers with a focus on energy efficiency and CO2 reduction. The ongoing  
investments in generation systems and heat distribution networks deliver an improved  
security of supply and a better energy efficiency. In the Czech Republic, the Energie AG  
Group operates boiler houses with an installed thermal output between 50 kW and 20 MW.  
Measures aimed at increasing their efficiency and reducing their CO2 footprint are carried out  
regularly.  
Effects of climate change on the business model  
The effects of climate change within the operations area of the Czech Republic Segment  
requires a differentiation between specific regional aspects as well as the water/waste water  
and heat business areas. For the supply with drinking water, quantitative resource problems  
must be expected regionally as well as over the course of the year. Peak coverage from  
additional storage facilities will become necessary in the case of longer periods with little  
precipitation. In the area of waste water, an increasing frequency of localised to regional  
heavy rain events must be expected to overburden the sewage systems and sewage  
treatment plants.  
The operator model is affected to a lesser degree by the described scenarios, because the  
infrastructure is owned by the municipalities, who are bearing the risk of having to adapt the  
infrastructure. Opportunities arise from the municipalities’ need for additional funding,  
leading to opportunities in the area of public-private partnerships (PPP). In the few cases  
where Energie AG entities own the infrastructure, additional investments for the  
development of new resources, for peak demand coverage, and for adaptation of the  
precipitation/stormwater drainage management must be expected.  
In the business area Heat, the milder cold periods must be expected to result in declining  
heat sales. Financial assistance from the EU climate initiatives may reinforce the trend toward  
new, alternative, and decentralised options for heat supply. At the same time, these new  
developments and the increasing demand for cooling supply offer the opportunity to develop  
new business models.  
Further information on performance and output data as well as key figures, benchmarking  
and environmental topics can be found at › www.energieag-bohemia.at and  
› www.energieag.cz, as well as in the Group Management Report, Czech Republic  
Segment › Page 137.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
73  
Non-financial report Environment  
HOLDING & SERVICES SEGMENT  
Building management  
In the interest of a sustainable and resource-optimised building, all larger new buildings,  
conversions and extensions of Energie AG Group in Austria (with the exception of the Waste  
Management Segment) have been made to comply with climate-friendly building  
standards since fiscal year 2020/2021. In addition to securing highly attractive jobs, this is  
also implemented in anticipation of the Taxonomy Regulation-relevant requirements for real  
estate assets.  
Energie AG has placed its focus firmly on its employees and their well-being at the  
workplace. This is why modern energy concepts for the various sites are planned and  
implemented in addition to Energie AG proactively exercising operator responsibility in  
accordance with ÖNORM B1301 (property and building safety).  
Together with other prominent Austrian companies and corporate groups, Energie AG is  
participating in a building benchmarking that in the 2021/2022 fiscal year once again  
documented the pioneering character of the included buildings with respect to economic  
operations and efficiency. Building techniques used for the PowerTower, such as the facade  
or component activation technique, were also used in the construction of the tower’s  
extension, which conformed with the standard promulgated by the Austrian Society for a  
Sustainable Real Estate Economy (ÖGNI). The building was commissioned in August 2022 and  
offers 230 additional workplaces along with 58 underground car parking spaces to the  
organisational units of Energie AG. In addition to health-oriented and modern workplaces,  
Energie AG employees also have access to flexible meeting facilities, socialising zones and a  
state-of-the-art “conference level”. Living up to its social responsibility, Energie AG is  
operating a childcare facility where the employees’ children are looked after.  
As of 30 September 2022, administration buildings in Austria owned by Energie AG (with the  
exception of the Waste Management Segment) had four PV systems with an output of  
around 344 kWp and an average yearly production of 317 MWh installed on their roofs. The  
total surface covered with PV modules is approx. 2,400 square metres. A further 6 new  
systems with 870 kWp bottleneck capacity are planned between now and the year 2027.  
The building yard project in Gmunden (PSG-PowerService Gmunden) was planned in  
accordance with climate-friendly standards. The civil engineering and building construction  
works (up to the roof substructure) were completed in fiscal year 2021/2022.  
Energie AG is firmly committed to a sustainable real estate strategy for its properties in  
Austria. The up-to-date energy certificate for each property is complemented by an energy  
monitoring report (not applicable to the Waste Management Segment). The report  
recapitulates the status quo with regard to the CO2 footprint of the subject matter real estate  
portfolio. Various scenario calculations formed the basis on which measures were derived that  
will also be reflected in the Group’s sustainability action to be seen in the years ahead.  
Staff catering  
The company restaurants and canteens of Energie AG in Linz, Gmunden, Timelkam and  
Riedersbach have placed an even stronger focus on the use of regional and seasonal fresh  
produce compared to the previous years. Direct partnerships with regional suppliers of  
produce and meat are sought out and established with increased intensity. In the  
2021/2022 fiscal year, the canteens prepared a total of 136,567 fresh servings of food for  
employees (previous year: 93,078). The decline in fiscal year 2020/2021 is attributable to  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
74  
Non-financial report Environment  
employees working from home as a result of the COVID-19 pandemic. In the interest of a  
balanced diet, the menus also feature vegetarian meal options. Around 25% of all lunches  
sold are vegetarian. The menu planning system is evaluated regularly with the aim of  
preventing or minimising food waste.  
Servings of food  
Unit  
2021/2022  
2020/2021  
2019/2020  
Servings of food for employees  
Number  
136,567  
93,078  
122,892  
IT services  
To reduce electronic waste, the useful life of user devices such as laptops and PCs was  
increased to five years. Once the equipment has reached the end of its useful life, there will  
be a certified data deletion and a refurbishment carried out by a sheltered workshop.  
Efficiency gains and energy consumption reductions are the predominant objectives in the  
operation of the data centre. Thanks to having virtualised more than 95% of its server  
landscape, significant energy savings were achieved in the consumption of electricity and air  
conditioning as well as operation of the hardware resources. Additionally, the exhaust warm  
air is used to heat the building.  
The use of central multi-function devices delivers savings in consumables such as toner  
and ink, which in turn save money and resources. The relocation of printers from the office  
workstations to central pickup points also contributes to an improvement of the air quality at  
the office workstations.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
75  
Non-financial report Social affairs  
SOCIAL AFFAIRS  
SDG 4, 6, 7, 9  
GRI 103-1, 103-2, 103-3  
In accordance with its mission statement “We care about tomorrow”, Energie AG is firmly  
committed to its social and socio-political responsibilities. The development, protection and  
fostering of socially sustainable values for society as a contribution to improving and  
safeguarding our quality of life is a top priority for the Group. In the area of social affairs, the  
following goals and fields of work have been defined:  
Reliability in supply and waste management services  
Positioning as a responsible company and guarantor of stability and reliability  
Building and maintaining sustainable client relationships  
Raising the awareness for a considerate treatment of natural energy resources and the  
objective of a sustainable circular economy  
SECURITY AND QUALITY OF SUPPLY  
GRI 103-1, 103-2, 103-3, EU DMA (formerly EU6), EU4, EU28, EU29  
The planning and implementation of projects focuses on the reliable and uninterrupted  
delivery of all services, including during a crisis.  
A major contribution to the supply security is made by Energie AG’s power plants and Netz  
OÖ GmbH’s electricity grid. On the one hand, Energie AG operates a power plant pool for  
balancing energy, making it a significant contributor to the primary and secondary  
balancing in Austria. On the other hand, the congestion management of Energie AG’s power  
plants, and the CCGT power plant in Timelkam in particular, make a significant  
contribution to supporting the grid.  
Owing to the war between Russia and Ukraine, the Austrian government and E-Control  
Austria are currently making preparations to further improve the security of supply.  
They include far-reaching measures such as the provisioning of a government-mandated  
reserve stock of natural gas, measures that facilitate the substitution of natural gas, and many  
others. Energie AG is also implementing measures to improve the security of supply and is  
not only focusing its precautions on gas customers, but also places a particular focus on  
assuring the secure supply with district heat. Keeping the CCGT power plant in Timelkam  
available for the energy market and congestion management is another important  
contribution to safeguarding the security of supply. The situation with regard to provisioning  
for eventualities is good when seen in conjunction with the measures introduced by the  
government, uncertainties do however arise from the difficulties in anticipating gas deliveries  
from Russia, Germany’s exit from nuclear energy, and insufficient power plant capacities in  
France. An EU-wide coordinated approach in the current energy crisis would be of great  
importance for the security of supply but also with regard to the development of energy  
prices.  
The black start and island operation capability of power plants allows for these plants  
to be started up without access to an external electricity supply. In fiscal year 2021/2022,  
Netz OÖ GmbH has successfully carried out a number of inspections of the black start and  
island operation functions with the generation resources available for a grid restoration.  
Netz OÖ GmbH is conducting regular training with grid simulators to evaluate  
coordinated grid restoration scenarios. Regularly recurring functional testing of the  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
76  
Non-financial report Social affairs  
generation plants relevant to a grid restoration along with testing of the operational  
processes are an important element in assuring the security of supply.  
In the current energy crisis, triggered by the war between Russia and Ukraine, measures to  
improve the security of supply with natural gas are being evaluated. They include an  
optimisation of fuel procurement, additional natural gas reserves in storage, as well as the  
harnessing of potentials for conversion and substitution of natural gas. The Group is also  
preparing the substitution of natural gas in response to the expected 1st Regulation on  
Natural Gas Steering Measures.  
The expansion and strengthening of the grid infrastructure combined with increasing  
energy storage capacities (e.g. pumped-storage power plants) is intended to quickly and  
fully buffer peak loads and compensate for the volatile infeed volumes from decentralised  
generation systems that produce energy from renewable sources.  
In the area of digitalisation, the fibre-optic networks is being expanded further as a  
prerequisite for a full-coverage supply of all regions in Upper Austria with internet access at  
the speed of light.  
Energie AG is taking steps to secure a high-quality supply with drinking water and waste  
water treatment services, especially in regions affected by water shortages, and also  
contributes technological know-how in the area of waste water treatment that will be used  
to create a solid infrastructure (e.g. leak localisation).  
The Waste Management Segment of Energie AG Group covers the entire value creation  
chain from waste collection to sorting and recycling/management on the highest technical  
level. The services are geared closely to the needs of residential, commercial/industrial and  
municipal customers.  
The unconditional assurance of security of supply, including under extraordinary  
conditions (threat of supply shortages on the energy market, dramatic price increases, the  
COVID-19 pandemic), and the ensuing strengthening of the Company’s resilience are among  
the top priorities of Energie AG Group.  
The impact of the war between Russia and Ukraine on the energy markets in  
fiscal year 2021/2022 led to the installation of a dedicated taskforce that convenes weekly.  
The aim of the taskforce is to develop appropriate technical, commercial and communicative  
responses that are commensurate in light of the supply and market situation. A weekly  
situation briefing and forecast is compiled on the basis of the information received from the  
environment and important business units.  
A task force that monitors the ongoing pandemic developments and devises the necessary  
measures has been in place since the 2019/2020 fiscal year. Special precautions to warrant  
the operation of critical infrastructure were taken and are explained in further detail in  
the section covering the social initiatives during hefty turbulences on the energy markets  
and after the COVID-19 pandemic › Page 82.  
Security of supply is the fundamental basis for general business growth, job creation and  
quality of life. Energie AG’s services are a major driver of Upper Austria’s international  
competitiveness as a business location.  
Netz OÖ’s asset management efforts are aimed at achieving the highest possible levels of  
efficiency in all activities in terms of reliability, quality and cost-effectiveness.  
To assess the ability to perform and the security and quality of supply, key performance  
indicators such as available grid capacity, grid reliability, grid interruptions and their causes  
(interruption time >3 minutes) are determined on an annual basis. The Group then uses these  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
77  
Non-financial report Social affairs  
findings to establish options for future action in the context of grid maintenance and  
expansion.  
Netz OÖ GmbH operates an electricity grid consisting of 33,445 km of power lines  
(previous year: 33,185 km), in addition to a 5,634 km gas grid (previous year: 5,624 km).  
These reliable and modern grids warrant the secure energy supply for more than 575,000  
grid customers.  
Grids in km  
2021/2022  
2020/2021  
2019/2020  
Electricity  
33,445  
33,185  
32,873  
Gas  
5,634  
5,624  
5,603  
Fibreglass 1)  
5,820  
7,021  
6,600  
1) The loss in the km-length of the fibre-optic network in fiscal year 2021/2022 in comparison to the previous years' figures is explained with the demerger of the FTTH unit.  
The electricity grid’s supply reliability, measured in terms of service-related unavailability  
(ASIDI; “Average System Interruption Duration Index”), was 44.53 min/a in calendar year  
2021 (2020: 50.82 min/a). It was 1.10 [1/a] (2020: 1.52 [1/a]) when measured on the basis of  
the ASIFI (“Average System Interruption Frequency Index”), with the statistic in both cases  
disregarding regionally exceptional events. The customer-related system unavailability (SAIDI –  
“System Average Interruption Duration Index”) stood at 52.89 min/a (2020: 53.58 min/a),  
while the customer-related average interruption frequency (SAIFI - “System Average  
Interruption Frequency”) was 1.34 [1/a] (2020: 1.68 [1/a]). The weather in calendar year 2021  
featured a series of strong thunderstorms between June and August. As a result of the  
geographic realities of the supply territory of Netz OÖ GmbH, the unavailability figures in  
Upper Austria are usually higher than the national average for all of Austria. The availability of  
the gas grid in calendar year 2021 was unchanged from the previous years at 99.99%.  
Supply reliability 1)  
2021  
2020  
2019  
SAIDI (min/a)  
52.89  
53.58  
34.47  
ASIDI (min/a)  
44.53  
50.82  
31.62  
SAIFI (1/a)  
1.34  
1.68  
1.17  
ASIFI (1/a)  
1.10  
1.52  
1.07  
1) These key figures are statistical key system figures for national and international comparison. They do not allow any conclusions on the interruption of individual localities.  
In the generation unit, the Group takes a holistic approach to optimise technical  
availability, starting with the planning and designing phase of power plants as well as by  
systematically developing maintenance strategies as part of due diligence measures.  
In addition to the environmental measures adopted during plant design, flood protection  
improvements also play a crucial role in Energie AG’s run-of-river power plant construction  
projects. The individual steps to be taken during day-to-day operation are set out in the  
officially approved workplace regulations.  
The supply reliability for customer connections in the fibre-optic network is  
determined by analysing the fault resolution times from the trouble ticket system. In the  
reporting period, it amounted to 99.98% (previous year: 99.99%). The fault resolution time  
designates the timespan between receipt of the fault report and the resolution of the fault.  
As of the end of the reporting period, the Group-owned fibre-optic network in the backbone  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
78  
Non-financial report Social affairs  
and business customer areas had a physical length of 5,820 km. The difference to the  
previous year’s figure results from the demerger of the FTTH fibre-optic network to BBOÖ, see  
Business model, Organisational structure of the Group › Page 19.  
Supply reliability customer connections in %  
2021/2022  
2020/2021  
2019/2020  
Supply reliability customer connections  
99.98  
99.99  
99.99  
The supply reliability is calculated using the following formula: availability = observation period less (-) total fault resolution times divided (/) by observation period multiplied (x)  
by 100%.  
Water supply availability in the Czech Republic Segment is constantly at or above 99.9%.  
Network quality in the drinking water sector fluctuates from year to year between 0.2 and  
0.3 cases of damage per kilometre per year, mainly due to weather conditions in winter.  
Network quality in the waste water sector is measured at around 0.1 grid interruptions per  
kilometre per year.  
In regions affected by climate change-related drought and increasing water scarcity, Energie  
AG secures the supply through subsidiaries that supply drinking water via tankers and  
cisterns. One measure to improve security of supply is the interregional integration of  
water supply systems. This enables drinking water from areas with surplus water to be sent  
to areas suffering from shortages. Energie AG’s subsidiaries also support their contractual  
partners in projects aimed at securing resources with extensive know-how in the area of  
water management.  
The operational processes of the Waste Management Segment were frequently adapted to  
the prevailing requirements in order to warrant the safe and reliable collection and  
management of all types of waste during the COVID-19 pandemic.  
CUSTOMER ORIENTATION AND SATISFACTION  
GRI 103-1, 103-2, 103-3, EU-DMA (formerly EU23)  
For the customers and all other stakeholders of Energie AG, the values of continuity,  
reliability, safety, sustainability and transparency are at the heart of Energie AG’s  
corporate strategy. In light of unpredictable crisis events, these values have gained enormous  
importance.  
The further intensification of the stakeholder dialogue, incl. by directly involving  
customers in strategy and development processes, is intended to contribute to products and  
services that are even more in line with the interests and requirements of the different target  
groups.  
Customer satisfaction is also increased by an open and transparent communication,  
initiatives for clean and “affordable energy for everyone”, the further streamlining of  
administrative processes, the comfortable access to digital services, and uncomplicated and  
rapid fault repair services.  
The customer forum introduced three years ago serves to actively involve Energie AG’s  
customers in the area of product design and collects valuable feedback on the Group’s offers  
and services. The intense customer dialogue assists in understanding their perspective,  
bringing the “outside perspective” into the company, and adding a whole new facet to the  
notion of customer proximity.  
A new platform for the customers of Vertrieb GmbH was launched in fiscal year 2020/2021  
when Energie AG introduced the customer club “My Bonus”. The members-only area gives  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
79  
Non-financial report Social affairs  
customers online access to special services and products, some of them available exclusively  
on the platform. The customer club is being revised on an ongoing basis – including in a  
dialogue with the stakeholders – and adjusted to meet the preferences and needs of the  
customers.  
Energie AG’s portfolio of digital services was complemented with additional innovative  
applications that assist customers in making economical use of energy and gaining access to  
electricity from renewable sources. This includes the development of a WiFi reader unit for  
smartphones that can detect energy-wasting household appliances.  
For many years, the Energy Saving Trade Fair has been an important leading trade fair for  
Energy AG in Austria. After the event’s cancelation in fiscal year 2020/2021, the most recently  
held event saw the Energie AG booth giving advice to around 2,100 interested parties. In the  
previous year, the physical trade fair was substituted with online advisory days that served  
around 1,000 customers.  
Energie AG responds to the increasing consumer demand for online services by expanding  
the fibre-optic network in urban and rural areas. 16,723 customers were already actively  
using the high-speed internet service offered by Energie AG as of 30 September 2022  
(previous year: 13,166).  
Energie AG’s customer service was honoured to be chosen once again as the recipient of  
the ÖGVS award from the Austrian Society for Consumer Studies in fiscal year 2021/2022.  
The annual “Industry Monitor” of the ÖGVS is the dominant Austrian ranking in the areas of  
customer satisfaction, customer service and price/value ratio and has collected more than  
250,000 reviews on a total of 1,824 companies. Energie AG was distinguished as “Industry  
Champion 2022” in the customer service category and received one ÖGVS award each for  
“TOP customer service electricity utility” and “TOP customer service gas utility”. A high level  
of service quality together with individual and competent customer care have always been  
important keys to success for Energie AG.  
Ongoing monitoring and permanent professional improvement initiatives help to ensure  
high-quality customer relationship management, whether over the phone, in person, or  
online.  
Netz OÖ GmbH has responded to the strong increase in the demand of residential customers  
who, as a result of higher energy prices, wish to sell the PV electricity produced on their roofs  
by introducing fundamental changes to the handling process in the spring months of 2022.  
This delivered noticeably shorter waiting times for customer applications. In the summer of  
2022, a comprehensive review of the Netz OÖ GmbH’s online presence made it  
significantly easier for interested parties to access important information on the topic of  
photovoltaic systems.  
Digitalisation: a powerful asset  
Energie AG places a focus on the digitalisation of services, processes and customer  
interaction along the entire value chain. One of the objectives of the digitalisation measures  
is to offer customers flexible, individual, and straight-forward options to get in contact with  
Energie AG and to offer self-services such as switching plans, registering as a new customer,  
the Energy Manager, consumption alerts, invoice download etc.  
The use of technologies such as “Artificial Intelligence” (AI) and “Machine Learning  
Algorithms” enable – when applied in consideration of the framework under data protection  
law – better and more cost-efficient customer services in the area of data analytics as well  
as more rapid and efficient service and decision making processes. The merging of customer  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
80  
Non-financial report Social affairs  
data from the Electricity, Gas, Heat and Telecom areas and a corresponding system  
harmonisation allow for the best possible service “from a single source”.  
The customer portals of Netz OÖ GmbH were merged and harmonised in terms of their  
functions in fiscal year 2020/2021. The new and revised customer portal now allows grid  
customers to review and administer the data of their electricity and gas connections.  
Responding to a run for decentralised generation units, the customer portal at  
› https://eservice.netzooe.at now features an information tool that enables customers to  
track the current status of their “PV application” (extension of the grid access agreement).  
The process is adjusted on a regular basis and thereby improved continuously.  
The digitalisation in the Waste Management Segment launched Austria’s first waste  
management online shop back in 2012 ( › containerdienst24.at). This internet portal  
enables users across Austria to order containers for clearing out bulky refuse, gardening  
waste or construction rubble. A regional contact person is available for specific questions and  
clarifications. In 2016, this service was › extended to key account customers, who can now  
access waste management services, invoices, weighing and freight notices, and check on the  
status of their orders. Individually configurable authorisation settings can be used by key  
account customers to allocate page- and location-specific permissions for employees. The  
customer portal enables a sustainable improvement of the waste management processes and  
simplifies the daily cooperation within the Waste Management Segment.  
Customer Phone Service  
A fundamental criterion for customer satisfaction is the rapid processing of enquiries  
received over the phone, which Energie AG handles with the help of service staff that has  
received extensive training and boasts strong communication skills. They are supported by  
artificial intelligence deployed for the automated processing of simple enquiries. An  
additional intelligent “peak management” allows for calls to be rescheduled to less busy  
times of the day. This increases the availability for the customers and in turn also their  
satisfaction with the Company. The ongoing energy crisis is causing a massive amount of  
customer inquiries that are handled in the best possible way with the help of the instruments  
outlined above.  
In the event of failures, which cause a substantial increase in calls from those affected within  
a very short period of time, calls need to be answered and processed with rapid turnaround.  
A flexible on-call service model for the customer service employees and a suitable  
infrastructure (remote work) enable an improved handling of unexpected or high call  
volumes.  
Introduction and Use of New Technologies  
Energie AG is actively committed to introducing and using new technologies, but always  
keeps the focus on the customer. Netz OÖ GmbH is among Europe’s leaders in large-scale  
smart metering. The intelligent electricity meters allow customers to precisely analyse and  
manage their energy consumption. A currently ongoing upgrade project aims at upgrading  
the smart meters with additional useful and pioneering functions. The proven system AMIS  
features several smart-grid functions that support grid operations and assist in achieving a  
high quality supply with electricity. The AMIS system is proving successful in real-world  
applications, regularly delivering availability figures in excess of 99%.  
Energie AG uses the new smart meter technology for developing new business models. The  
Company views smart electricity meters as the key component for turning a house into a  
“smart home”. Interaction between electricity meters and home automation systems  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
81  
Non-financial report Social affairs  
facilitate a perfect use of energy, which users will be able to generate, purchase or store. This  
delivers cost savings, lower consumption and greater comfort for the customer. Smart meters  
are also a prerequisite for the new market models and market roles introduced with the  
Renewable Energy Expansion Act package. Their benefits include, inter alia, consumption  
billing within the renewable energy communities, and they can also serve as the foundation  
for the peer-to-peer trading app › “E-Fairteiler”.  
The Czech water investments have been using smart digital water meters for several years  
at this point. The digitalisation projects focus on smart metering in Beroun and smart  
metering and grid digitalisation in Kolin. Other studies on the digitalisation of control centres  
and operations as well as the development of a “digital twin” for a sewage treatment plant  
are ongoing. “Digital twins” are models that e.g. virtually simulate the operation of a sewage  
treatment plant in order to probe the effects of different measures taken within the  
simulation before they are implemented in live operations.  
Customer satisfaction surveys  
Contact with customers and partners enables Energie AG to learn about their needs,  
concerns and ideas and to use these insights for the development of solutions for specific  
problems and the optimisation of processes. Complaint management is a key mechanism in  
this area. Together with Customer Service, the Group analyses the communications on a  
quarterly basis, evaluating the subject areas and using these as a basis to establish options for  
action. This includes the cooperation with social services for debt prevention and mitigation  
of debt-related problems by means of the energy solidarity budget and providing advice on  
how to reduce energy costs.  
The continuous evaluation of the needs of existing and potential new customers has  
shown that prices are the issue closest to their heart. The focus is increasingly shifting to  
aspects like the security of supply as well as confidence in the energy supplier and its  
reputation. With the long-standing price guarantee, product bundles at special conditions  
and numerous additional offers, Energie AG presents itself as a reliable partner.  
Regular market studies and customer surveys are conducted among various target groups  
as a due diligence measure to ensure their satisfaction. Valuable information for the  
ascertainment of the most important key performance indicators and their development over  
time was once again collected through basic surveys conducted in fiscal year 2021/2022.  
The majority of customers of Vertrieb GmbH were found to exhibit a high loyalty: 95.6% of  
them, for example, are very satisfied or rather satisfied with the sales unit (previous year:  
95.9%). Continually measuring loyalty levels in defined categories (e.g. product range, price  
communication, provision of information, regional commitment etc.) provides specific focal  
points that allow the company to improve services on an ongoing basis.  
The customer satisfaction survey conducted by Netz OÖ GmbH regarding gas grid operators  
in autumn of 2021 once again delivered a very good result. The highest level of satisfaction  
was expressed for the availability of the gas supply, followed by the satisfaction with the  
technical expertise, keeping with agreed dates, and the performance of works and meter  
readings. Using a 1 to 5 scale based on Austria’s school grades system, Netz OÖ GmbH’s  
customers rated their distribution grid operator’s reliability (grade 1.42, previous year: grade  
1.15), safety (grade 1.48, previous year: grade 1.24) and quality (grade 1.54, previous year:  
grade 1.28).  
Annual customer satisfaction surveys are also carried out at all the Waste Management  
Segment’s sites. These include a school marking-style assessment system, in which the  
segment received a 1.42 (previous year: 1.36) during the reporting period 2021/2022.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
82  
Non-financial report Social affairs  
Customer satisfaction survey results  
Unit  
2021/2022  
2020/2021  
2019/2020  
Vertrieb GmbH (electricity/total)  
Very or rather satisfied  
%
95.6  
95.9  
96.5  
Netz OÖ GmbH  
Reliability  
Grade  
1.42  
1.15  
1.13  
Security  
Grade  
1.48  
1.24  
1.32  
Quality  
Grade  
1.54  
1.28  
1.32  
Waste Management Segment  
Grade  
1.42  
1.36  
1.40  
Online communication  
Energie AG makes target group-specific information available via a number of different  
channels. This includes the traditional website of the Group › www.energieag.at, the press  
portal › news.energieag.at, the project websites › www.wir-denken-an-morgen.at for  
children and adolescents, › www.sportfamilie.at for sport enthusiasts, the blog pages  
( › blog.energieag.at and › hochspannungsblog.at), the Facebook page › Energie AG – Wir  
denken an Morgen, the Instagram account › energie.ag and the Instagram  
( › energieagsportfamilie) and Facebook ( › Energie AG-Sportfamilie) accounts of the sports  
family. These services are complemented by additional websites for specific Energie AG  
products.  
Responding to the customers’ needs and preferences, Energie AG offers functional self-  
service portals, mainly in the mass market areas. These enable customers to independently  
deal with a number of tasks and issues relating to supply contracts with Energie AG at any  
time of day.  
Social responsibility during hefty turbulences on the energy markets  
and the COVID-19 pandemic  
Energie AG Group seeks to position itself as a strong and reliable partner for its  
stakeholders at all times and especially in exceptional situations. The company has proven its  
reliability not only during the COVID-19 crisis, but also with concrete activities in  
fiscal year 2021/2022, which was dominated by the war between Russia and Ukraine and  
hefty turbulences on the energy markets that emphasised its resolve to stability, security,  
commitment to social concerns and regional value creation, in line with the campaign  
motto “100% for Upper Austria”.  
While competitors were responding to dramatic increases in the price of energy by  
terminating their customers’ contracts, Energie AG extended the price guarantee for its  
existing customers until 1 January 2023. This guarantee of contractually agreed prices was  
also made available to new customers. In the spring months of 2022, commercial and  
industrial customers were offered noticeable relief in the form of special conditions under a  
business tariff that was introduced for this particular purpose on short notice.  
Energie AG also showed solidarity with Ukrainian families faced with the fallout of the war  
between Russia and their own country: In an internal fundraiser in the spring months of  
2022, the Group’s workforce collected EUR 56,000 for the “SOS Kinderdorf Ukraine Nothilfe”  
orphanage, with the company more than doubling that amount to a total of EUR 120,000.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
83  
Non-financial report Social affairs  
In order to further fulfil its supply and waste management mandate and at the same time  
protect the health of its customers and employees, the internal task force with experienced  
members of the crisis management team was permanently monitoring the further  
development of the COVID-19 pandemic in order to prepare any necessary measures and  
coordinate their implementation across the whole Group in clearly organised processes. Once  
normal operations had been resumed and staff members returned to their workplaces, a  
particular emphasis was placed on aspects related to cultural education. The education and  
training measures were adapted to the respective pandemic situation.  
Austrian customers who were facing difficulties due to the pandemic were supported with  
special arrangements, e.g. a moratorium on electricity disconnections and the option to  
defer due payments.  
REGIONAL RESPONSIBILITY AND SOCIAL COMMITMENT  
GRI 103-1, 103-2, 103-3, 102-9, 204-1  
Energie AG is pursuing the goal of further increasing the regional value creation by  
implementing infrastructure projects on the local level, cooperating more closely with local  
specialist companies (market partners) and involving regional providers into the procurement  
chain. The Group is firmly committed to advancing projects that enable customers to  
consume and exchange decentrally produced renewable energy.  
To the largest extent, Energie AG Group delivers on its regional responsibility through  
operating hydropower plants across all of Upper Austria. Ongoing infrastructure investments,  
the continuous training of specialist personnel and the creation and preservation of jobs are  
important contributions to increasing value generation in the regions.  
The high-performance fibre-optic internet connections provided by Energie AG offer the  
residents of structurally disadvantaged regions the opportunity to pursue an occupational  
activity (working from home). The continued expansion of the fibre-optic network and  
development of innovative digital services support the positive economic development of the  
regions in Upper Austria and contribute to increasing quality of life of the population.  
Market partnerships with relevant specialist companies across Upper Austria is Energie AG’s  
way of assuring the availability of expert advice and help with energy-related questions for  
customers in their respective home towns and villages, as well as motivating them to save  
energy through attractive funding options and joint initiatives with these local businesses.  
In its supply chains, Energie AG aims at procuring from companies with a regional  
connection. Orders worth a total of EUR 216.2 million were placed with 2,281 suppliers in  
the 2021/2022 fiscal year (previous year: EUR 208.2 million with 2,303 suppliers). 92.5% of  
suppliers were headquartered in Austria (previous year: 93.2%), while 7.4% were based in  
other European countries (previous year: 6.7%).  
Regional procurement  
Unit  
2021/2022  
2020/2021  
2019/2020  
Contracted suppliers  
Number  
2,281  
2,303  
2,213  
Of which in Austria  
%
92.5  
93.2  
92.3  
Of which in other European countries  
%
7.4  
6.7  
7.6  
Others  
%
0.1  
0.1  
0.1  
Order volume  
EUR mill.  
216.2  
208.2  
204.0  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
84  
Non-financial report Social affairs  
The cooperation with Genussland Oberösterreich initiated by Energie AG in autumn  
2020 and completed at the end of calendar year 2021 awarded shopping vouchers  
redeemable at participating businesses to new customers who selected product bundles with  
green electricity or biogas from local production.  
The Energie AG tour bus on its regional roadshow through towns and villages in Upper  
Austria in summer 2022 distributed thousands of energy-saving LED lamps to customers.  
Energie AG is firmly committed to social engagement, with the Group initiating and  
supporting institutions and projects of significance for the economy as well as projects in the  
areas of science, art and education on a local level. The Company takes its function as a  
role model in terms of social responsibility very seriously and also fulfils this role by pro-  
actively taking initiative and supporting charitable organisations.  
The online platform › wasserkarte.info is a good example for the support of non-profit  
organisations in the regional and interregional area. It shows fire brigade crews the quickest  
way to a hydrant.  
Activities in the fields of sport, culture and social affairs  
GRI 102-12  
Energie AG supports cultural and sport activities on a regional level, including by  
sponsoring local events, sport promotion programmes (“ › Energie AG sports family”) and  
online fitness services.  
In the 2021/2022 fiscal year, 14 athletes of the Energie AG sports family received financial  
assistance as well as other benefits of relevance to their sport and were provided with an  
environment that promotes and facilitates physical and human development. The main focus  
is on the sustainable promotion of up-and-coming talents and supporting already successful  
athletes. The following principles are at the heart of Energie AG’s sport promotion  
programme: willingness to perform, team spirit, authenticity and regionality.  
On the cultural scene, the company has been partner of exhibition projects organised by OÖ  
Landes-Kultur GmbH (the state-owned cultural outlet formerly known as Upper Austria’s  
Culture Precinct) for a number of years, and exhibitions are regularly held in Linz’s Power  
Tower.  
The Klemens-Brosch Award in cooperation with the State Gallery in Linz, the “Talent  
Promotion Award” in cooperation with the University of Arts in Linz, and the “Dream  
Scholarship” in cooperation with OK Friends are additional ways in which the Energie AG  
Group supports young and talented artists.  
Energie AG awarded a digital art prize for the first time in the summer of 2022 and thereby  
also emphasised its focus on the future and innovative projects.  
In addition, Energie AG has been a long-standing partner of many cultural initiatives  
throughout Upper Austria, including the Upper Austrian Regional Exhibition, Salzkammergut  
Festwochen summer festival, St. Florianer Sängerknaben boys’ choir and Brucknertage  
festival.  
As a partner of the volunteer fire brigade and the Red Cross, the Energie AG Group  
makes an effort to support rescue organisations with a high level of voluntary commitment.  
In the town of Timelkam, Energie AG runs an information centre about electrical energy  
called the Erlebniswelt Energie Timelkam (“ › Timelkam Energy Experience”), which in the  
2021/2022 fiscal year was visited by almost 1,800 interested children and parents (previous  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
85  
Non-financial report Social affairs  
year: 400). Annual visitor numbers were around the 5,000 mark in earlier years (without  
COVID-19 pandemic restrictions).  
Enhancing awareness  
The Group considers the raising of an awareness for a sensible and considerate treatment of  
energy resources and the value of a sustainable circular economy to be one of its most  
important responsibilities in the area of social affairs. Energy AG is a supporter of initiatives  
run by youth organisations in the area of sustainability, energy and environment. For many  
years, Upper Austria’s scouts, the Pfadfinder, have been implementing environmental projects  
with the support of the Energie AG Group and the Province of Upper Austria. The yearly  
project contest “ › UmWeltdenker”, for example, elicits creative ideas in this area and  
implements the best of them.  
The “Energie AG at School” education programme (Energie AG macht Schule) offers  
kindergartens and schools classroom handouts on the topics of energy, sustainability and  
digitalisation.  
Energie AG takes initiative in strengthening the media competency of children and  
adolescents in connection with digitalisation and, by means of school materials and the  
website › www.wirdenkenanmorgen.at, familiarises them with a sensible and responsible  
use of new technologies and digital media. The platform is complemented by interactive  
quizzes, videos and instructions for practical exercises and experiments.  
In addition, the Group has a selection of short books for the youngest programme  
participants, which cover topics relating to energy and sustainability. The eight books  
published so far can be ordered by private persons, schools and kindergartens free of charge.  
Approximately 390,000 copies of these short books are already in circulation (previous year:  
380,000). This is supplemented with a workshop for kindergartens, which introduced  
children from the age of four to sustainability issues in a playful way.  
Energie AG accompanies an educational programme for Czech primary and junior  
secondary school pupils, which aims to protect our natural environment and water  
resources and began in 2014. The Group promotes awareness of how to properly dispose of  
rubbish by providing customised classroom materials for primary schools and creative projects  
for older pupils.  
The Czech Republic Segment honoured the occasion of the World Water Day 2022 by  
publishing the card game “Serenato”, which aims at explaining the processes involved in the  
treatment of waste water in sewage treatment plants.  
Respect for the environment and a commitment to a green and efficient business model are  
guiding principles that underpin Energie AG’s ethos. The Energie AG Group has supported  
the Energy Globe environmental award for some 23 years. Since 1999, over 30,000 projects  
for environmental protection and climate change mitigation have been submitted in the areas  
of earth, water, fire, air, and youth.  
Federation, association and organisation memberships  
GRI 102-12, 102-13  
Energie AG is a member of associations and representative groups related to its operational  
activities, both in Austria and abroad. The Company’s employees also play a role in various  
bodies, committees and working groups within these organisations. All Energie AG’s  
employees can reap the benefits from these memberships in the form of newsletters, events,  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
86  
Non-financial report Social affairs  
webinars, as well as access to online portals, publications, studies, models, analytical findings  
and more. The following memberships are particularly noteworthy:  
› Association of Austrian E-Businesses (Verein Österreichs E-Wirtschaft)  
› Association of Industrial Companies (Industriellenvereinigung, IV)  
› Chamber of commerce (Wirtschaftskammer, WK)  
› Initiative for Upper Austria as a business location (Initiative Wirtschaftsstandort  
Oberösterreich, IWS)  
› Österreichische Energieagentur (Austrian Energy Agency GmbH, AEA)  
› Federal Association of Energy and Water Companies (Bundesverband der Energie  
und Wasserwirtschaft, BDEW)  
› Energy Saving Association of Upper Austria (Energiesparverband Oberösterreich)  
› Association for Ecology and Environmental Research (Verein für Ökologie und  
Umweltforschung, VÖU)  
› Federal Association of Electric Mobility (Bundesverband Elektromobilität, BEÖ)  
› Austrian Association of Water and Waste Management Companies (Österreichischer  
Wasser- und Abfallwirtschaftsverband, ÖWAV)  
› Verband österreichischer Entsorgungsfachbetriebe (Verband österreichischer  
Entsorgungsfachbetriebe, VÖEB)  
› Sdružení oboru vodovodů a kanalizací ČR, z.s (SOVAK)  
Science and research have traditionally been accorded high value at Energie AG. One area in  
which this is evident is the long-standing partnership with the › Energy Institute  
(Energieinstitut) at Johannes Kepler University (JKU) in Linz. As a founding member,  
Energie AG Group actively participates in shaping and further improving the institute and  
draws on its high level of expertise in energy-related areas and its interdisciplinary team.  
Energie AG commissions studies from the institute on a consistent basis and works together  
closely with it on research projects. Noteworthy example projects include those concerned  
with the use of sustainable heat sources (e.g. industrial exhaust heat) and their distribution  
within district heating networks (“HeatHighway”, “Gmunden HT-Link”) or the possibilities of  
future energy storage systems on hydrogen basis (“Underground Sun Storage 2030”).  
Energie AG has been a member of the › Energy Centre České Budějovice, an energy  
information centre in České Budějovice supported by the Province of Upper Austria and  
the Region of South Bohemia, since 1998. The centre’s priority areas are offering support for  
the implementation of energy efficiency measures and the use of renewable energies. Since  
2002, Energie AG has also been a member of the Fachgruppe Energie (Energy Working  
Group), which seeks to establish a cross-border cooperation in the energy sector between  
Upper Austria and South Bohemia. The working group supports cross-border projects and  
provides a platform for the exchange of knowledge and experience.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
87  
Non-financial report Employees  
EMPLOYEES – RESPONSIBLE EMPLOYER  
SDG 4, 5, 8  
GRI 103-1, 103-2, 103-3, 102-7, 102-8, 102-41, 404-2  
Energie AG’s goals as an employer seeking to embrace responsibility are:  
Further development of employer branding with a special focus on promoting diversity  
(such as women in technical professions)  
Personnel and management development, as well as high-quality apprenticeship  
programmes  
Ensuring access to qualified personnel in the long term, in particular by positioning the  
Company as a family-friendly employer  
ACTING AS A RESPONSIBLE EMPLOYER  
Energie AG has, in particular with regard to marked transitions in the work and life reality of  
its employees, positioned itself as a crisis-safe and responsible employer by establishing  
additional flexible work time models, creating the technical conditions for remote working,  
working from home etc., as well as providing demand-oriented childcare options for  
employees.  
An elaborate procedure executed by an economy magazine in cooperation with three  
prominent online platforms determined Austria’s 300 best employers 2022, with Energie AG  
taking the first place in the energy sector as well as the nationwide overall ranking thanks to  
the measures taken.  
In a study of the attractiveness of employers in Upper Austria conducted by “Market  
Institute” on the basis of a representative survey of Upper Austria’s population in gainful  
employment, Energie AG Group took the third place in the overall rating as “best employer  
2021”. Energie AG took the first place among all rated companies in Upper Austria in the  
subcategories crisis safety and job safety and was awarded the associated quality badge.  
The Group’s apprenticeship programme secures a comprehensive practical training for  
young talents, who rotate through different business areas with relevant career opportunities,  
and is a preventative measure in light of the general shortage of skilled workers. Dedicated  
trainee programs are intended to give external target groups an excellent career start at  
Energie AG Group. Scholarships and other financial assistance options that explicitly target  
female technicians contribute to the promotion of diversity and equal opportunity.  
The implementation of sustainability objectives requires committed and satisfied  
employees. As an important employer in the supply regions, Energie AG offers attractive and  
secure jobs. Flexible work time models, high quality work equipment, and a wide range of  
training and professional education options are important contributions to this goal.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
88  
Non-financial report Employees  
STAFF LEVELS AND PERSONNEL STRUCTURE  
Unit  
2021/2022  
2020/2021  
2019/2020  
Staff (number of employees)  
Persons  
5,041  
5,030  
4,997  
Workplace  
Full-time equivalents (FTE) 1)  
Number  
4,606  
4,593  
4,560  
In Austria  
2,858  
2,843  
2,847  
Female  
537  
541  
535  
Male  
2,321  
2,302  
2,312  
In the Czech Republic  
1,711  
1,715  
1,678  
Female  
408  
410  
400  
Male  
1,303  
1,305  
1,278  
In other European countries  
37  
35  
35  
Female  
5
4
4
Male  
32  
31  
31  
Part-time  
Persons  
508  
477  
475  
Female  
%
68.3  
69.0  
68.0  
Male  
%
31.7  
31.0  
32.0  
Newly hired  
Persons  
593  
520  
562  
Newly hired  
%
11.8  
10.3  
11.2  
Female percentage of newly hired  
%
27.0  
-
-
Male percentage of newly hired  
%
73.0  
-
-
Turnover rate (excluding retirements) 2)  
%
6.8  
5.9  
6.3  
Demographics  
Average age of workforce  
Years  
44.5  
44.2  
44.4  
Average time served in company 3)  
Years  
12.2  
-
-
1) The information stated regarding employees relates to full-time equivalents (FTE) as a yearly average of the fully-consolidated and proportionately consolidated companies.  
2) Turnover rate incl. dismissals during probation period  
3) Workforce is recognised based on time served in fully-consolidated and proportionately consolidated entities.  
As of 30 September 2022, Energie AG Group had 5,082 employees or 4,630 FTE in three  
countries (previous year: 5,061 employees; 4,611 FTE). An average of 184 temporary staff  
(154 FTE) were employed for limited-time projects and to balance peak work loads in the  
2021/2022 fiscal year (previous year: 198 employees, 165 FTE).  
All employment contracts with employees are governed by collective agreements or works  
agreements. Energie AG Group employs personnel from 32 different countries (previous  
year: 29).  
A staff turnover rate of 6.8% in fiscal year 2021/2022 is mainly attributable to the Waste  
Management Segment and the company Market Calling Marketinggesellschaft mbH.  
The Group offers indefinite employment contracts to the vast majority of its personnel.  
Only 368 staff members had fixed-term employment contracts in fiscal year 2021/2022, 334  
of them in the Czech Republic Segment.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
89  
Non-financial report Employees  
Employment contracts  
Unit  
2021/2022  
Fixed-term contracts  
Number  
368  
Female  
94  
Male  
274  
In Austria  
28  
In the Czech Republic  
334  
In other European countries  
6
Indefinite contracts  
Number  
4,673  
Female  
1,055  
Male  
3,618  
In Austria  
2,996  
In the Czech Republic  
1,644  
In other European countries  
33  
LIFE AND WORK AT ENERGIE AG OBERÖSTERREICH  
Energie AG supports a good balance between work and family life. Except for the Waste  
Management and Czech Republic Segments, the Company has been certified via the  
“berufundfamilie” audit since 2012. This allows it to position itself as a family-friendly  
employer, gain advantages in the competition for skilled professionals, and help to create a  
positive working environment by means of the associated raft of measures for management  
and employees.  
The “Active Parental Leave Management” programme supports employees in Austria in  
planning the periods they will be off work. A nursing care platform offers comprehensive  
information and service links for employees who care for and support dependents. To make  
holiday planning easier, Energie AG supported its employees through the summer months of  
2022 by providing a varied programme for children between the ages of six and 12. Since  
July 2020, the cooperation with the Salzkammergut Hospital in Gmunden has been offering  
employees a year-round kindergarten for their children in addition to the daily bookable  
summer camp. The company’s in-house childcare facility (“Loomiland”) in the new  
corporate headquarters in Linz opened its doors in July 2022. The little ones are cared for by  
two qualified early childhood teachers from the Family Alliance Upper Austria (OÖ  
Familienbund). In addition to the child-friendly rooms with sophisticated designs, the facility  
offers exterior grounds of almost 300 m2 with play equipment, a sand pit and pavilions.  
In order to increase the awareness for Energie AG’s “Charter of agile, interdisciplinary  
cooperation”, numerous small groups discussed the contents’ relevance and derived areas  
with potential for optimisation.  
Many employees are active participants in one of the eleven culture & sport sections  
(fishing, hiking, family excursions, photography, football, cultural events, music, jogging, bike  
riding, sailing, skiing, rifle shooting, volleyball, scuba diving, tennis) and also establish private  
relationships with their colleagues.  
The survey “New ways to work from home” conducted within Energie AG in Austria returned  
positive feedback and resulted in the extension of the previous remote work model, making  
work more flexible.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
90  
Non-financial report Employees  
The revised works agreement concerning the granting of a paid “training period” was  
introduced in response to the newly arisen needs of employees in relation to training and  
professional development.  
PERSONNEL AND MANAGEMENT DEVELOPMENT  
A key goal is to provide targeted services to prepare employees and managers for the  
challenges they will face in the working world of the future. The training programme 2021/  
2022 offered employees a wide range of options to improve their own skills and  
competencies. In addition to a proven series of seminars, the programme was expanded by  
adding new contemporary contents, mainly in the area of methodology and media  
competence.  
The learning platform EINSTEIN offers an extensive training programme and is available  
24/7 to all employees and managers in Austria.  
The focus in the area of methodological competence was on the wider field of  
“communication”. Various new seminars explored a range of aspects, e.g. the speaker’s  
voice, argumentation and quick-wittedness as well as the moderation of hybrid events.  
Occupational development  
Occupational development  
Unit  
2021/2022  
2020/2021  
2019/2020  
Training per employee 1)  
Hours  
11.3  
8.6  
8.8  
Performance review rate  
%
69.3  
69.3  
74.2  
Apprentices  
Persons  
76  
76  
73  
Apprenticeships completed  
Persons  
17  
26  
16  
1) incl. hire personnel and apprentices, excl. training at the leadership academy and safety inductions  
Due to the success of the virtual “Digithek”, an element of the “Neuland 2021” digitalisation  
campaign, this programme will transition into a permanent format under the heading  
“Digithek 365”: a short seminar on a current IT topic will be offered once a month by an  
internal lecturer. Further information on the digitalisation campaign “Neuland” can be found  
in the section headed Business models fit for the future – innovation › Page 45.  
The personnel development programme accessible via the EINSTEIN system offered various  
training opportunities in the areas of media competency and methodological competency,  
thereby making a significant contribution to keeping the employee’s know-how up to date,  
especially in the area of digital media and work methods, and securing their best work  
performance.  
A master thesis compiled in fiscal year 2021/2022 examined the conflict management  
system of Energie AG and evaluated it on the basis of surveys and their analysis. An  
accompanying seminar programme for groups and team managers is intended to raise the  
awareness for the topic and the instrument available to them. Employees were offered  
information events that also aimed at sensitising them for the topic.  
The Energie AG workforce was offered the online training on how to stay motivated and  
perform at work to support them during the COVID-19 pandemic, a situation that many  
staff members have experienced as extremely difficult. Employees were also enabled to  
engage with the topic “polarisation and opposites” in a webinar.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
91  
Non-financial report Employees  
Managing directors and departmental heads deliberated on the challenges related to good  
leadership during the COVID-19 pandemic in a day of reflection offered in cooperation with  
an external coach. An instrument that supports the teams in reflecting on their cooperation  
was made available in the form of the guideline titled “Healthy leadership”.  
The “Leadership Experience Discussion Circle” for team and group leaders was continued  
in the 2021/2022 fiscal year and consisted of three yearly sessions that deal with leadership  
topics in small groups that are guided by a coach. The group is intended to help attendees  
solve problems that arise in their day-to-day leadership roles, as well as encouraging these  
supervisory staff to be open to bouncing ideas off each other. The “Manager Group  
Coaching” continues to be the method of choice on the level of the managing directors and  
departmental heads.  
The competency model continues to form the basis for the feedback meetings between the  
Management Board/Managing Directors/heads of departments.  
The “Energie AG Future Lab” is an open and innovative format (workshops, seminars,  
excursions, lectures etc.) that aims at providing methodological and technical training to  
managerial personnel and also offers space to engage with future topics. Junior staff  
(PowerTalents) from Energie AG Group are involved in the programme in addition to  
Managing Directors and heads of departments.  
Employer branding  
The age structure of the employees working in the Group entities and the challenges in  
recruiting suitable skilled personnel call on the Energie AG Group to employ a strategically  
coordinated recruiting and succession management that serves the purpose of making  
potential employees aware of the Company and of opportunities to apply for jobs at an early  
stage. In addition to continuing the general employer branding campaign, the  
2021/2022 fiscal year also focused on trainees and scholars. The sponsoring package for  
associations and clubs gives Energie AG Group the opportunity to harness the social circle of  
its employees to approach additional potential job candidates. The positioning of the  
employer brand was evaluated in workshops and interviews with staff members.  
Promoting diversity and women in technical careers  
Due to the great success achieved in the previous years, two more scholarships were  
awarded to female technicians in autumn 2021 (previous year: three). The scholars not  
only receive financial support, but can also complete internships at Energie AG and write  
their master’s thesis drawing on their experiences with the Company, potentially fostering  
strong ties between the Company and these scholars from an early stage.  
Diversity  
Unit  
2021/2022  
2020/2021  
2019/2020  
Women  
%
23.5  
23.5  
23.1  
Men  
%
76.5  
76.5  
76.9  
Women in management positions 1)  
%
14.6  
15.2  
15.8  
Men in management positions  
%
85.4  
84.8  
84.2  
1) Definition of “management position”: Managing Directors, heads of departments, divisions, facilities, holding companies, corporate units, teams and groups.  
To ensure the Company is capable of mastering future challenges, it is important for Energie  
AG that its employees have the relevant skills at their disposal and for diversity to be  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
92  
Non-financial report Employees  
embraced not only in recruiting, but also internally (for example, when filling management  
positions).  
Since 2014, Energie AG has been providing material and intellectual support to gifted and  
socially engaged pupils of immigrant origin through the START scholarship program, laying  
the foundations for these scholars to pursue academic study. This support covers the costs for  
(one-time) PC equipment, educational materials, seminar attendance, annual meetings, and  
regional events and workshops.  
MAINTAINING THE HIGH QUALITY OF APPRENTICESHIP  
PROGRAMMES  
Energie AG’s in-house apprenticeship programme is an important competitive advantage.  
Since 1943, 1,549 apprentices have successfully completed their training and become top-  
qualified specialists in their fields. About half of these are still employed in the Company  
today. In September 2022, 22 youngsters (previous year: 22), began their apprenticeships at  
Energie AG in the areas of electrical engineering and metals engineering, as well as for the  
first time in gas, water and heating technology. In keeping with our mission to promote  
diversity, apprentices of immigrant descent and asylum seekers also have their place in the  
Energie AG Group.  
The marketing activities have been significantly scaled up in districts with a higher demand  
for skilled workers (e.g. Schärding, Ried, Braunau). The apprenticeship trainers will pay  
personal visits to the polytechnic schools in these districts. A new advertising campaign is  
currently being developed and will be launched in future fiscal years.  
The cooperation with mandatory-attendance schools (electrical engineering polytechnic  
course, PowerGirls, Girls Day) as well as the offers for job shadowing took place in almost  
the same way as in the years before, despite the COVID-19 pandemic.  
Safety and health are especially important to Energie AG in its apprentice training. The  
Company offers professional workshops and seminars to provide guidance to young people  
on topics such as preventing addiction and using the internet safely, as well as since  
fiscal year 2021/2022 a three-part communication training that is spread across the full  
length of the apprenticeship programme.  
The most important milestone for an apprentice is the skilled worker examination at the  
Austrian Economic Chambers. The quality of training was also documented in the  
2021/2022 fiscal year, receiving an outstanding result. Between them, the 16 current  
graduates (previous year: 18) earned 10 distinction grades in vocational school and 13 good  
or outstanding results in their final examinations. At the Apprentice Awards held by the  
industrial sector in Upper Austria, the team of Energie AG apprentices in their second year  
took the first and third place in the category energy technology.  
With 22 new apprentices per year, the apprentice workshop continues to operate at  
maximum capacity. The modernisation of the building and its fitout was continued in  
fiscal year 2021/2022 with the start of the conversion of the mechanical workshop, the roof  
and the facade and will not be completed before the year 2025.  
The recruiting process is continuously adapted to the situation on the market. Due to a  
multi-faceted approach geared to the qualification, local demand and place of residence of  
the candidates, all apprenticeship positions were filled with qualified young talents.  
In 2018, Energie AG initiated the establishment of the › “zukunft.lehre.österreich”  
association Future Apprenticeships Austria (ZLÖ). Its objective is to strengthen the image of  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
93  
Non-financial report Employees  
apprenticeships in Austria. The role of president is currently occupied by its creator, Chief  
Executive Officer DDr. Werner Steinecker MBA. Joining forces with the other members of the  
association, Energie AG aims to restore the status that apprenticeships deserve as a key  
foundation of business and, in turn, of society both today and in the future. Since 2018, we  
have worked meticulously to design and advertise an Austria-wide apprenticeship platform  
and an apprenticeship-related image campaign aimed at the target group.  
WORKPLACE HEALTH AND SAFETY  
GRI 403-1, 403-2, 403-3, 403-4, 403-5, 403-6, 403-7, 403-8  
The health and safety of employees is understood as an important success factor and  
promoted by targeted priority programmes and internal campaigns.  
Only healthy and satisfied staff can be successful with their work for a company. Energie  
AG works to ensure awareness and personal responsibility around the quality of work and  
occupational safety among its employees. In fiscal year 2021/2022, the internal campaign  
“100% safe” was launched to alert employees to potential hazards in their work  
environment and at the same time motivate them to contribute their own ideas on how to  
further improve work safety.  
The “in-house psychological service hotline” of Energie AG Group offers employees free  
advice and help in conflicts, stress, work overload, anxiety, sleep disorders and personal crises  
(bereavements, sickness etc.). The service offers advice in person or over the phone and aims  
at carving out possible solutions that the employees can implement in their own  
responsibility.  
In accordance with § 4 of the Employee Protection Act (ASchG), potential hazards are  
ascertained and assessed by the respective managerial staff (or the responsible commissioned  
staff member pursuant to § 9 Administrative Penal Act (VStG)) and § 23 Work Inspection Act  
(ArbIG) with the help from the relevant work safety and occupational health experts. This  
forms the foundation for the determination of measures (workplace evaluation). The “Safety  
Manual” of the Austrian lobby group “Österreichs Energie” serves to evaluate individual  
activities. Shortcomings in the Austrian entities detected during the regular inspections  
pursuant to § 77a Work Safety Act (ASchG) are also assessed in accordance with a risk matrix  
pursuant to ISO 45001:2018 (excluding the Waste Management Segment). The employees  
also rate their work activities on a risk matrix provided by the safety management in the form  
of training templates.  
Work accidents or incidents that almost resulted in an accident are investigated by the safety  
management in accordance with the Employee Protection Act insofar as an investigation  
appears expedient for the prevention of further accidents. This allows for the  
development of suitable measures, such as a change of work materials, work equipment,  
work processes, personal protective equipment, or more frequent inductions.  
Hazards and risks are reported to the direct line manager. Other persons (employer, safety  
expert, occupational health specialist etc.) are involved as required to identify these hazards  
and minimise risks as far as possible. In accordance with § 82 Employee Protection Act, the  
employees have access to all services offered by an occupational health specialist.  
As required under the Employee Protection Act, the involvement of safety liaison staff or the  
relevant employee representatives assures that the employees are involved in issues  
concerning work safety.  
The employer communicates safety-relevant issues to employees down the hierarchical  
levels in accordance with the organisational structure and in consultation with the safety  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
94  
Non-financial report Employees  
liaison officer. The employees in Austria have access to a wide range of training options  
on work safety (e.g. e-learning modules on preventative fire protection, protection against  
falls, work in enclosed spaces; in-person events for construction site safety, working with  
electricity, and working with lifting equipment).  
Preventive action and information are used to prevent work-related adverse health conditions  
and staff are directed to be more conscious in their approach to health through the  
“energy@work” project. If an individual has already fallen ill, the Company takes steps to  
promote their recovery. Energie AG’s company health management policy was awarded the  
“Betriebliche Gesundheitsförderung bis 2022” (Workplace Health Promotion) seal of  
approval (except for the Czech Republic and Waste Management Segments).  
Numerous programmes contribute to safeguarding the employees’ health (e.g.“healthy  
15 minutes”, Medimouse (spinal) measurements, first aid courses, shiftwork fitness basics  
workshop).  
Topical issues are discussed and solutions are developed in regular health meetings  
including employee representatives, occupational health professionals and safety  
management specialists. Weekly exercise programmes at a number of work sites also  
promote health awareness. The range of occupational healthcare services includes extensive  
contact during consultation hours and vaccination campaigns. The results of the employee  
survey 2021 was followed up with a range of measures in the individual subsidiaries.  
The first health day took place at the new building of Umwelt Service GmbH in Wels in the  
spring of 2022. Employees had the opportunity to have preventive medical check-ups with  
trained experts from the health sector at several stations, attend workshops and learn about  
healthy nutrition.  
Workplace safety  
Unit  
2021/2022  
2020/2021  
2019/2020  
Work accidents  
Number  
69  
70  
80  
Accident rate  
‰
14.10  
14.80  
16.20  
Days of sick leave  
Number  
19.90  
29.20  
32.40  
LTIF 1)  
8.29  
9.70  
9.35  
Deaths after work-related injuries  
Number  
0
0
1
Workplace and construction site inspections 2)  
Number  
157  
169  
52  
1) Lost Time Injury Frequency Index – frequency of work accidents per one million work hours  
2) Workplace and construction site inspections 2021/2022 and 2020/2021 excl. Czech Republic Segment 2019/2020 excl. Waste Management Segment and Czech Republic  
Segment  
Energie AG ensures that the specifications of the Employee Protection Act and the associated  
regulations are consistently observed throughout the Group, and that appropriate  
preventative measures are implemented. In the 2021/2022 fiscal year, the Group (excl. Czech  
Republic Segment) saw around 157 announced and unannounced workplace, external  
workplace and construction site inspections carried out by safety experts and  
occupational health professionals together with those responsible on site and/or Energie AG  
Group management as part of due diligence measures (previous year: 169). Office workplaces  
were reviewed to assure ergonomic design and, if necessary, adjusted to keep the number of  
musculoskeletal conditions among employees as low as possible.  
A total of 69 reportable work accidents were registered (previous year: 70), which  
corresponds to an accident rate of 14.1 accidents per 1,000 employees (previous year:  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
95  
Non-financial report Compliance  
14.8 accidents per 1,000 employees) 1). The accident severity amounted to an average of  
19.9 days of sick leave per work accident (previous year: 29.2). Converted to an international  
indicator value, this corresponds to an LTIF (Lost Time Injury Frequency) of 8.29 per 1 million  
working hours (previous year: 9.70). As in the previous year, there were no fatal work  
accidents.  
The legally required inductions with respect to health and safety at work and risk prevention  
steps are regularly held throughout the Energie AG Group. The short briefings were extended  
to include several new topics and are available for employees to access online.  
A large number of subject-specific training courses were conducted during the reporting  
period as part of due diligence measures. Employees of third-party contractors in the  
technical and electrical engineering sectors are also allowed to attend if they require  
additional training. In addition to training courses on “working with live electrical  
equipment” and operational use authorisation, training modules on low and high voltage  
electrical system operation and management authorisation were also offered, along with  
other safety-related topics such as working with lifting equipment.  
While the natural objective of the safety experts is to bring the rate and severity of  
accidents down to zero, they place great emphasis on potential work accidents with a high  
likelihood of occurrence and high severity of the potential injury. Approaching this number  
requires employees to receive the best possible training and the responsible colleagues to  
receive maximum support. Workplaces and activities are also subjected to a continuous  
evaluation and the necessary measures are adjusted as required.  
Energie AG takes workplace safety (i.e. potential hazards and risks in and around the  
buildings) very seriously. Building security inspections for all office, workshop and storage  
buildings are carried out annually to check how safe they are. The results of these inspections  
are to used to develop measures both to comply with legal requirements and to serve as a  
way of preventing hazards from arising in the first place.  
COMPLIANCE  
SDG 5, 8  
GRI 102-16, 103-1, 103-2, 103-3, 205-3  
Energie AG’s compliance goals are:  
Ensuring a value-conscious compliance culture  
Preventing property damage and reputational damage  
Ensuring fair competition by compliance with the law and regulations  
Ensuring compliance with all Group-wide guidelines and standards  
Minimising/Avoiding liability risks and non-material damage  
Raising awareness among Energie AG employees of compliance with guidelines and the  
Codes of Conduct  
Implementing effective prevention measures  
Avoiding infringements of legal and in-house standards  
1)  
Up to cut-off date of 30 September 2022, including partially consolidated companies.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
96  
Non-financial report Compliance  
LEGAL COMPLIANCE AND PREVENTION OF CORRUPTION  
Particular emphasis is placed on the protection of customer interests, which is ensured by the  
Group-wide applicable › Code of Conduct “This is how we think, this is how we act”  
together with internal monitoring, quality assurance, and complaint management systems.  
› Compliance at Energie AG is based on a mutual understanding of values, which is  
expressed in the › Code of Conduct and published for all stakeholders, managers and  
employees. The Code of Conduct assures the compliance of our actions with the relevant  
laws and regulations. It forms the foundation for all business activities and decisions within  
Energie AG Group as well as for a morally, ethically and legally flawless conduct of all  
employees of the Group. The Code of Conduct is mandatory for all employees and contains  
essential rules concerning respectful conduct and open communication. All managers and  
employees throughout the Group have been and will continue to be informed about the in-  
house Code of Conduct.  
Additionally, the › “Code of Conduct for Contractors” newly developed in  
fiscal year 2021/2022 deals with safeguarding human dignity, responsible communications  
and data processing, environmental conduct and sustainability, as well as integrity and also  
sets out the consequences of violations of these principles and rules.  
Internal and external audits serve the purpose of highlighting potential improvements and  
necessary actions that support the continuous development of the management systems.  
Audits are very important for Energie AG in this context as well as in light if the changing  
general conditions, especially with regard to the risks from the progressing digitalisation.  
Compliance Management System  
To establish compliance effectively throughout the Company, a compliance management  
system was established, appropriate guidelines were developed and numerous training  
sessions and awareness measures were implemented in recent years. The content,  
responsibilities, distributions of skills, and required documentation and reporting have all  
been decided. Information on compliance is provided to staff via e-learning, among other  
formats. Employees can decide for themselves when they want to use this interactive tool,  
allowing them to fit the sessions into their work routine in a way that best suits their needs.  
Whistleblower system  
Staff members may use Energie AG’s web-based whistleblower system to report, including  
anonymously, suspected compliance breaches to the Compliance Officer. Employees and  
external persons may also contact a compliance email address or telephone number to report  
their observations. Reports about suspicious activities (including from external persons) that  
are received elsewhere within the Group must be forwarded to the Compliance Officer  
without delay. All whistleblowers are assured strict confidentiality with regard to their identity  
as well as the contents of the reported circumstances.  
As part of the Energie AG Group’s due diligence measures, the experts in the various areas of  
legal specialism monitor the relevant national and European legislative frameworks. The  
Compliance Organisation is involved in issues relevant to the Group as a whole.  
In the interest of a continuous improvement process, the compliance management system  
was subjected to an external evaluation in 2021. The result confirmed that the system  
conforms with all essential elements required for certification to the international standard  
ISO 19600:2014.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
97  
Non-financial report Compliance  
The Group refers to legal databases, a range of legal commentaries, newsletters and legal  
registers from external providers to ensure that up-to-date versions of the relevant  
requirements are always used in the Legal Department’s operational activities. The Legal  
Department acts as one of a number of information channels, notifying the relevant  
departments and entities of new legal developments. The Group provides legal certainty and  
ensures compliance with the applicable requirements by attending seminars, specialist  
conferences, participating in various committees, keeping up to date with the latest legal  
developments and legislative plans, and scheduling visits to individual locations.  
Internal control system  
For further information about Energie AG’s internal control system, see the Group  
Management Report, Internal control system › Page 118.  
Anti-corruption  
Energie AG’s entities and employees are subject to provisions regarding public officials  
(Amtsträger) within corruption law. Training sessions are held continuously to ensure the  
Group-wide implementation of the comprehensive compliance standards in force at the  
Energie AG Group to prevent corruption. The “Anti-Corruption” learning module offered in  
Austria has so far been completed by 80.0% of the employees in the country (previous year:  
79.1%).  
There were no incidents of corruption in the Energie AG Group in the 2021/2022 fiscal year  
or in the previous years.  
Antitrust compliance  
GRI 206-1  
Energie AG unconditionally declares its commitment to fair competition with its competitors,  
business partners and other market participants. With its comments on the necessary market  
behaviour, the antitrust law manual is primarily aimed at the sales-oriented divisions and is  
also available to all employees in the Energie AG Group via the Intranet. Since the  
2018/2019 fiscal year, a Group-wide learning module has been available on the subject of  
antitrust law/competition law to ensure that all members of staff (in particular, new  
employees) demonstrably have access to a well-prepared treatment of the topic. The primary  
target groups for graduating this module are all sales and sales-related units as well as  
procurement staff.  
The Austrian Federal Competition Authority (BWB) is conducting investigations throughout  
Austria into the area of collection and transport in the waste management industry. These  
investigations also entailed search warrants executed at the premises of Umwelt Service  
GmbH in March 2021 and April 2022. Umwelt Service GmbH is actively assisting in the  
investigation. There were no other incidents related to antitrust law.  
Data protection  
GRI 418-1  
Energie AG maintains a data protection management system to ensure Group-wide  
implementation and compliance with the provisions of the General Data Protection  
Regulation (EU 2016/679; GDPR) and the new Austrian Data Protection Act  
(Datenschutzgesetz; DSG 2018) that has been in effect since 2018.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
98  
Non-financial report Compliance  
Energie AG’s Data Protection Policy explains the data protection management system’s  
essential operational framework. Energie AG is aware of the trust that its customers place in  
the Company. As a result, security, integrity and trust is a top priority when handling personal  
data in day-to-day operations.  
The data protection processes the Group has implemented log and process valid complaints  
regarding breaches of customer data protection, resulting in corrective action if necessary. As  
was the case in the previous year, no reportable data protection violations pursuant to GDPR  
Article 33 were identified in the past fiscal year.  
Promoting a compliance-conscious culture  
Management are responsible for promoting a compliance-conscious culture among staff.  
Energie AG ensures that its employees know the compliance standards and the values from  
the Code of Conduct and put them into practice. Within the annual definition of targets, the  
Management Board has the opportunity to agree on measurable and adjustable compliance  
goals that form part of the management performance with the Company’s managers and  
executives. The managerial staff further confirm their adherence to the relevant and  
compulsory compliance requirements of Energie AG in these individual target agreements.  
The conduct of Netz OÖ GmbH’s management and employees in relation to lobbying  
activities is based on its own › Code of Conduct in accordance with § 7 of the Austrian  
Lobbying Act (LobbyG). Netz OÖ GmbH has created an equal treatment programme and  
appointed an equal treatment officer based on its legal obligations as an electricity and gas  
distribution grid operator.  
Compliance forum  
The Compliance forum was set up to ensure that compliance questions are handled in a  
comprehensible manner. Regular meetings help to ensure the necessary exchange of  
information and consistent treatment of compliance-related matters throughout the Group.  
All areas of the Group have the opportunity to submit compliance queries and receive  
compliance advice.  
Information security management  
In order to be able to reliably guarantee continuous service to customers and other  
stakeholders in line with their needs, Energie AG has maintained a comprehensive, Group-  
wide information security management system for a number of years. Especially in the  
age of digitalisation and cyber-attacks, detecting and countering risks and attacks of this  
nature is of great importance. A risk-based assessment is made on the basis of a group-wide  
analysis of the impact on the process landscape (business impact analysis). It is carried out  
using a newly established governance risk compliance (GRC) system and forms the starting  
point for the subsequent risk assessment, in which Energie AG periodically and systematically  
analyses and evaluates threats to its information security, decides its stance on any risks and  
takes effective steps to control and reduce these risks.  
The cyber risk and fidelity insurance taken out in fiscal year 2018/2019 has been updated and  
forms part of the information security management risk assessment 2021/2022. Key areas of  
activity are ISO 27001:2015-certified and are regularly reviewed. A recertification audit  
pursuant to ISO 27001:2015 was carried out in the 2021/2022 fiscal year in the department  
for Group IT Services of the Business Services GmbH. The requirements stemming from the  
Austrian Network and Information System Security Act (Netz- und  
Informationssystemsicherheitsgesetz; NISG), which aim to ensure a high degree of security for  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
99  
Non-financial report Compliance  
networks and information systems, were gradually implemented in the relevant areas in a  
timely manner. The Group-wide awareness campaign “Schlaufuchs” regularly informs users  
about the risks and dangers and offers yearly (electronic) training programmes.  
In addition, Energie AG has taken a large number of steps to establish and maintain an  
adequate level of security. However, even the most strenuous effort cannot guarantee  
absolute security in today’s information and communication technology, meaning that there  
is always a certain residual risk. As a result, Energie AG has an emergency and crisis  
management system in place, enabling it to safely restore orderly operation and customer  
supply as quickly as possible in the event of a failure.  
Supply chain  
GRI 102-9, 102-10  
Owing to the current fundamental market conditions and ensuing market turbulences,  
almost all of Energie AG’s procurement areas are affected by massive price increases and  
enormous delivery delays. A forward-looking approach has so far served well in dampening  
these effects and safeguarding the core business areas of Energie AG. An example is the  
auditing of cable producers with a boycott-safe supply chain and reaffirmed fixed delivery  
dates.  
The pertinent contractual terms and conditions Energie AG (excluding the Czech Republic  
Segment) has relied upon in fiscal year 2021/2022 require all contractors to disclose their  
subcontractors, suppliers and all of their respective upstream contractors and  
subcontractors. Contractors are obliged to replace any (sub)contractors if there are justified  
reasons that speak against the respective subcontractor and supplier.  
Anyone contracting with Energie AG as a supplier must give an undertaking to perform  
orders in compliance with the relevant regulations, including all employee protection  
regulations, e.g. the Employee Protection Act, Regulation on the Protection of Construction  
Workers; the Employment of Foreign Nationals, undertaking to legally compliant waste  
disposal, and no prior convictions for wage and social dumping. For regional sourcing, please  
see Social affairs, Regional responsibility › Page 83.  
In purchasing processes, some environmentally relevant criteria are set as mandatory  
requirements in the text of requests for proposal. The supplier assessment provided for in the  
Group’s purchasing manual includes an environmental component. Tenders for transport  
services are awarded with a strong preference on low CO2 emissions. Tenders for cleaning  
services pay particular attention to the biodegradability of cleaning products. Purchases are  
geared to longevity, e.g. the average useful life of transformers is 45 years.  
The majority of natural gas for customers and for the production of electricity and heat and  
operation of the gas reservoirs is sourced on stock markets and OTC trading venues in the  
following markets: TTF (Netherlands), THE (Germany), VTPa (Austria). There are no direct  
contracts with natural gas prospecting companies. The system does not provide information  
on the physical origin of the gas. The composition of the natural gas distributed within  
Europe has changed over the course of calendar year 2022. The Russian proportion has  
declined from around 40% in the year 2021 to around 20% (as of September 2022), while  
the proportion of LNG and gas from Norway has increased.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
100  
Non-financial report Compliance  
RESPECT FOR HUMAN RIGHTS  
SDG 8  
GRI 406-1  
The well-being of all persons within its supply area is an important goal for Energie AG  
Group. The Group focuses its actions on providing a safe and reliable supply that enables  
well-being, trade and commerce, and a high quality of life.  
Respect for human rights is a natural part of life for the Energie AG Group. Energie AG  
expects all business partners to adhere to the statutory framework, along with the applicable  
laws and standards on human rights. In this respect, the Group cannot discern any material  
risks for compliance with the applicable legal standards in the European Union and in Europe.  
Risks in the earlier links of the supply chain cannot be entirely ruled out. For this reason, the  
Group exercises due diligence in procurement. Since early 2022, bidders and contractors who  
wish to do business with Energie AG must accept the General Terms and Conditions along  
with the › “Code of Conduct for Contractors”. The latter also sets out the principles related  
to human dignity.  
Equal treatment has been identified as a human rights issue that could fall within the  
Company’s direct sphere of influence, although there is no significant risk in this regard.  
Employees may contact the Compliance Officer, the Works Council or their respective  
supervisors if they have concerns about a possible discrimination. As in the previous years, no  
incidents of discrimination were reported in the 2021/2022 fiscal year, nor were any legal  
proceedings underway.  
Energie AG does not tolerate any discriminatory conduct or any unequal treatment, whether  
on the basis of national or ethnic origin, religion, age, gender or other traits. Diversity  
presents valuable potential for Energie AG as an international company Group. Energie AG  
respects the unique nature of each individual, and is committed to tolerant and respectful  
conduct as well as open communication. The effects of this include promoting a climate of  
mutual appreciation and respect and applies to all of the Group’s employees as well as  
everyone who lives in the supply area. Behaviours aiming towards fair and trusting interaction  
with one another are supported.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
101  
Non-financial report Compliance  
Intentional or targeted misinformation will not be tolerated. Maintaining an open and  
constructive dialogue with those responsible on the European, national, regional, and  
municipal levels, as well as lobbyists, non-governmental organisations (NGOs: non-  
governmental organisations formed privately or under private law) and the residents directly  
affected by Energie AG’s projects is very important to the Group, especially in the interest of  
sustainability and responsible governance.  
The actions of Energie AG always abide by the Group’s guiding principle “We care about  
tomorrow”. The Energie AG Group will continue to develop its sustainability management in  
the 2022/2023 fiscal year on the basis of environmental and social aspects.  
Linz, 5 December 2022  
The Management Board of Energie AG Oberösterreich  
Chief Executive Officer  
DDr. Werner Steinecker MBA  
Dr. Andreas Kolar  
Dipl.-Ing. Stefan Stallinger MBA  
Chairman of the Management Board  
Member of the Management Board  
Member of the Management Board  
CEO  
CFO  
COO  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
102  
Non-financial report GRI content index  
GRI CONTENT INDEX 2021/2022  
The GRI content index describes, in accordance with the GRI standard of the “Global  
Reporting Initiative” (GRI), “core” option, where in this non-financial report 2021/2022 the  
reader can find standard disclosures and the farther-reaching supplementary indicators.  
General disclosures  
GRI Standard  
Disclosure  
Reference to information available online  
Remarks and omissions  
GRI 102: General Disclosures 2016  
Organizational Profile  
102-1  
Name of the  
About this report › Page 15  
organisation  
102-2  
Activities, brands,  
Business model › Page 16  
products, and services  
102-3  
Location of  
Business model › Page 16  
headquarters  
102-4  
Location of operations  
Business model › Page 16  
102-5  
Ownership and legal  
Shareholder structure › Page 18  
form  
102-6  
Markets served  
Business model › Page 16  
102-7  
Scale of the  
Key figures at a glance › Page 21  
organisation  
Employees – responsible employer › Page 87  
Group Management Report › Page 108  
102-8  
Information on  
Employees – responsible employer › Page 87  
employees and other  
workers  
102-9  
Supply chain  
Regional responsibility and social commitment › Page 83  
Supply chain › Page 99  
102-10  
Significant changes to  
Supply chain › Page 99  
No significant changes.  
the organisation and its  
supply chain  
102-11  
Precautionary principle  
Sustainability opportunities and risk  
or approach  
management › Page 34  
Sustainability at a glance › Page 35  
Quality, safety and environmental  
management › Page 39  
102-12  
External initiatives  
Activities in the fields of sport, culture and social  
affairs › Page 84  
Federation, association and organisation  
memberships › Page 85  
102-13  
Membership of  
Federation, association and organisation  
associations  
memberships › Page 85  
Strategy  
102-14  
Statement from senior  
Letter by the Management Board › Page 13  
decision-maker  
Strategy 2030 › Page 26  
Sustainability objectives › Page 33  
102-15  
Key impacts, risks and  
Sustainability at a glance › Page 35  
opportunities  
Ethics and Integrity  
102-16  
Values, principles,  
Stakeholder dialogue › Page 24  
standards, and norms of  
Sustainability at a glance › Page 35  
behaviour  
Quality, safety and environmental  
management › Page 39  
Compliance › Page 95  
Governance  
102-18  
Governance structure  
Group management bodies › Page 18  
Group structure › Page 19  
Group Management Report, Change in the Group  
Management › Page 118  
102-32  
Highest governance  
About this report › Page 15  
body’s role in  
sustainability reporting  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
103  
Non-financial report GRI content index  
GRI Standard  
Disclosure  
Reference to information available online  
Remarks and omissions  
Stakeholder Engagement  
102-40  
List of stakeholder  
Dialogue with stakeholders › Page 24  
groups  
102-41  
Collective bargaining  
Employees – responsible employer › Page 87  
agreements  
102-42  
Identifying and selecting  
Dialogue with stakeholders › Page 24  
stakeholders  
102-43  
Approach to stakeholder  
Dialogue with stakeholders › Page 24  
engagement  
102-44  
Key topics and concerns  
Letter by the Management Board › Page 13  
raised  
Major sustainability issues › Page 0  
Dialogue with stakeholders › Page 24  
Strategy 2030 › Page 26  
Business models fit for the  
future – innovation › Page 45  
Customer orientation and satisfaction › Page 78  
Reporting Practice  
102-45  
Entities included in the  
Notes to the Consolidated  
consolidated financial  
Financial Statements, Scope of consolidation › Page 157  
statements  
102-46  
Defining report content  
About this report › Page 15  
and topic boundaries  
Major sustainability issues › Page 0  
102-47  
List of material topics  
Major sustainability issues › Page 0  
102-48  
Restatements of  
Business model › Page 16  
No restatement of information due to the  
information  
Changes under corporate law › Page 117  
agreed termination of electricity and gas  
sales activities in Germany.  
102-49  
Changes in reporting  
Major sustainability issues › Page 0  
102-50  
Reporting period  
About this report › Page 15  
102-51  
Date of most recent  
About this report › Page 15  
The 2020/2021 Group annual report was  
report  
published in December 2021.  
102-52  
Reporting cycle  
About this report › Page 15  
102-53  
Contact point for  
About this report › Page 15  
questions regarding the  
report  
102-54  
Claims of reporting in  
About this report › Page 15  
accordance with the GRI  
Standards  
102-55  
GRI content index  
GRI content index 2021/2022 › Page 102  
102-56  
External assurance  
The 2021/2022 non-financial report was  
reviewed by the Energie AG Group audit on  
behalf of the Supervisory Board. An  
external assurance did not take place.  
SIGNIFICANT ISSUES  
Partnership with equity investors and outside creditors  
GRI Standard  
Disclosure  
Reference to information available online  
Remarks and omissions  
GRI 103: Management Approach 2016  
103-1  
Explanation of the  
Major sustainability issues › Page 0  
material topic and its  
Strategy 2030 › Page 26  
boundary  
Sustainability at a glance › Page 35  
Economy › Page 41  
Group Management Report › Page 108  
103-2  
The management  
Sustainability at a glance › Page 35  
approach and its  
Economy › Page 41  
components  
Group Management Report › Page 108  
103-3  
Evaluation of the  
Sustainability at a glance › Page 35  
management approach  
Quality, safety and environmental  
management › Page 39  
Economy › Page 41  
Group Management Report, Internal control  
system › Page 118  
GRI 201: Economic Performance 2016  
201-1  
Direct economic value  
Economy › Page 41  
generated and  
Group Management Report › Page 108  
distributed  
Consolidated Financial Statements › Page 148  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
104  
Non-financial report GRI content index  
Business models fit for the future & innovation  
GRI Standard  
Disclosure  
Reference to information available online  
Remarks and omissions  
GRI 103: Management Approach 2016  
103-1  
Explanation of the  
Major sustainability issues › Page 0  
material topic and its  
Strategy 2030 › Page 26  
boundary  
Sustainability at a glance › Page 35  
Economy › Page 41  
103-2  
The management  
Sustainability at a glance › Page 35  
approach and its  
Economy › Page 41  
components  
103-3  
Evaluation of the  
Sustainability at a glance › Page 35  
management approach  
Quality, safety and environmental  
management › Page 39  
Economy › Page 41  
Group Management Report, Internal control  
system › Page 118  
G4 EU Electric utilities sector supplement  
EU DMA  
Research and  
Business models fit for the  
(2013)  
development  
future – innovation › Page 45  
formerly EU8  
Group Management Report, Research, development and  
innovation › Page 120  
Security and quality of supply  
GRI Standard Disclosure  
Reference to information available online  
Remarks and omissions  
GRI 103: Management Approach 2016  
103-1  
Explanation of the  
Major sustainability issues › Page 0  
material topic and its  
Strategy 2030 › Page 26  
boundary  
Sustainability at a glance › Page 35  
Security and quality of supply › Page 75  
103-2  
The management  
Sustainability at a glance › Page 35  
approach and its  
Security and quality of supply › Page 75  
components  
103-3  
Evaluation of the  
Sustainability at a glance › Page 35  
management approach  
Quality, safety and environmental  
management › Page 39  
Security and quality of supply › Page 75  
Group Management Report, Internal control  
system › Page 118  
G4 EU Electric utilities sector supplement  
EU1 (2013)  
Installed capacity,  
Energy Segment › Page 55  
broken down by energy  
Proprietary electricity procurement › Page 58  
source  
EU2 (2013)  
Net energy output  
Energy Segment › Page 55  
Proprietary electricity procurement › Page 58  
EU4 (2013)  
Length of transmission  
Security and quality of supply › Page 75  
and distribution lines  
EU DMA  
Availability and  
Security and quality of supply › Page 75  
(2013)  
reliability  
formerly EU6  
EU28  
Power outage frequency  
Security and quality of supply › Page 75  
EU29  
Power outage duration  
Security and quality of supply › Page 75  
Customer orientation and satisfaction  
GRI Standard  
Disclosure  
Reference to information available online  
Remarks and omissions  
GRI 103: Management Approach 2016  
103-1  
Explanation of the  
Major sustainability issues › Page 0  
material topic and its  
Strategy 2030 › Page 26  
boundary  
Sustainability at a glance › Page 35  
Customer orientation and satisfaction › Page 78  
103-2  
The management  
Sustainability at a glance › Page 35  
approach and its  
Customer orientation and satisfaction › Page 78  
components  
103-3  
Evaluation of the  
Sustainability at a glance › Page 35  
management approach  
Quality, safety and environmental  
management › Page 39  
Customer orientation and satisfaction › Page 78  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
105  
Non-financial report GRI content index  
GRI Standard  
Disclosure  
Reference to information available online  
Remarks and omissions  
Group Management Report, Internal control  
system › Page 118  
G4 EU Electric utilities sector supplement  
EU3 (2013)  
Number of customer  
Grid Segment › Page 65  
accounts  
EU DMA  
Demand-side-  
Sales › Page 62  
(2013)  
management  
formerly EU7  
EU DMA  
Programmes for the  
Dialogue with stakeholders › Page 24  
(2013)  
improvement and  
Customer orientation and satisfaction › Page 78  
formerly EU23  
maintenance of access  
to electricity and  
services, including  
partnerships with the  
government  
Regional responsibility & social commitment  
GRI Standard  
Disclosure  
Reference to information available online  
Remarks and omissions  
GRI 103: Management Approach 2016  
103-1  
Explanation of the  
Major sustainability issues › Page 0  
material topic and its  
Strategy 2030 › Page 26  
boundary  
Sustainability at a glance › Page 35  
Regional responsibility and  
social commitment › Page 83  
103-2  
The management  
Sustainability at a glance › Page 35  
approach and its  
Regional responsibility and  
components  
social commitment › Page 83  
103-3  
Evaluation of the  
Sustainability at a glance › Page 35  
management approach  
Quality, safety and environmental  
management › Page 39  
Regional responsibility and  
social commitment › Page 83  
Group Management Report, Internal control  
system › Page 118  
GRI 203: Indirect Economic Impacts 2016  
203-1  
Infrastructure  
Strategy 2030 › Page 26  
investments and  
Energy Segment › Page 55  
services supported  
Grid Segment › Page 65  
Group Management Report, Business development in the  
Group › Page 112  
203-2  
Significant indirect  
Economy › Page 41  
economic impacts  
GRI 204: Procurement Practices 2016  
204-1  
Proportion of spending  
Regional responsibility › Page 83  
on local suppliers  
G4 EU Electric utilities sector supplement  
EU DMA  
Stakeholder involvement  
Dialogue with stakeholders › Page 24  
(2013)  
in decision-making in  
formerly EU19  
connection with energy  
planning and  
infrastructure  
investments  
Climate protection & resource conservation  
GRI Standard  
Disclosure  
Reference to information available online  
Remarks and omissions  
GRI 103: Management Approach 2016  
103-1  
Explanation of the  
Major sustainability issues › Page 0  
material topic and its  
Strategy 2030 › Page 26  
boundary  
Sustainability at a glance › Page 35  
Environment › Page 47  
103-2  
The management  
Sustainability at a glance › Page 35  
approach and its  
Environment › Page 47  
components  
103-3  
Evaluation of the  
Sustainability at a glance › Page 35  
management approach  
Quality, safety and environmental  
management › Page 39  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
106  
Non-financial report GRI content index  
GRI Standard  
Disclosure  
Reference to information available online  
Remarks and omissions  
Environment › Page 47  
Group Management Report, Internal control  
system › Page 118  
GRI 305: Emissions 2016  
305-1  
Direct (Scope 1) GHG  
Emissions › Page 48  
emissions  
305-2  
Energy indirect (Scope  
Emissions › Page 48  
2) GHG emissions  
GRI 306: Waste 2020  
306-1  
Waste generation and  
Waste Management Segment › Page 67  
significant waste-related  
impacts  
306-2  
Management of  
Waste Management Segment › Page 67  
significant waste-related  
impacts  
306-3  
Waste generated  
Waste Management Segment › Page 67  
G4 EU Electric utilities sector supplement  
EU12 (2013)  
Transmission and  
Grid Segment › Page 65  
distribution losses  
Responsible employer & workplace health and safety  
GRI Standard  
Disclosure  
Reference to information available online  
Remarks and omissions  
GRI 103: Management Approach 2016  
103-1  
Explanation of the  
Major sustainability issues › Page 0  
material topic and its  
Strategy 2030 › Page 26  
boundary  
Sustainability at a glance › Page 35  
Employees – responsible employer › Page 87  
103-2  
The management  
Employees – responsible employer › Page 87  
approach and its  
components  
103-3  
Evaluation of the  
Sustainability at a glance › Page 35  
management approach  
Quality, safety and environmental  
management › Page 39  
Employees – responsible employer › Page 87  
Group Management Report, Internal control  
system › Page 118  
GRI 403: Occupational Health and Safety 2018  
403-1  
Occupational health and  
Sustainability at a glance › Page 35  
safety management  
Workplace health and safety › Page 93  
system  
403-2  
Hazard identification,  
Workplace health and safety › Page 93  
risk assessment, and  
incident investigation  
403-3  
Occupational health  
Workplace health and safety › Page 93  
services  
403-4  
Worker participation,  
Workplace health and safety › Page 93  
consultation, and  
communication on  
occupational health and  
safety  
403-5  
Worker training on  
Workplace health and safety › Page 93  
occupational health and  
safety  
403-6  
Promotion of worker  
Workplace health and safety › Page 93  
health  
403-7  
Prevention and  
Not relevant  
mitigation of  
occupational health and  
safety impacts directly  
linked by business  
relationships  
403-8  
Workers covered by an  
Quality, safety and environmental  
occupational health and  
management › Page 39  
safety management  
system  
GRI 404: Training and Education 2016  
404-2  
Programs for upgrading  
Personnel and management development › Page 90  
No transition assistance programmes to  
employee skills and  
facilitate career endings resulting from  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
107  
Non-financial report GRI content index  
GRI Standard  
Disclosure  
Reference to information available online  
Remarks and omissions  
transition assistance  
retirement were provided in the 2021/2022  
programs  
fiscal year.  
GRI 406: Non-discrimination 2016  
406-1  
Incidents of  
Respect for human rights › Page 100  
discrimination and  
corrective actions taken  
Legal compliance and prevention of corruption  
GRI Standard  
Disclosure  
Reference to information available online  
Remarks and omissions  
GRI 103: Management Approach 2016  
103-1  
Explanation of the  
Major sustainability issues › Page 0  
material topic and its  
Strategy 2030 › Page 26  
boundary  
Sustainability at a glance › Page 35  
Compliance › Page 95  
103-2  
The management  
Sustainability at a glance › Page 35  
approach and its  
Compliance › Page 95  
components  
103-3  
Evaluation of the  
Sustainability at a glance › Page 35  
management approach  
Quality, safety and environmental  
management › Page 39  
Compliance › Page 95  
Group Management Report, Internal control  
system › Page 118  
GRI 205: Anti-corruption 2016  
205-3 Confirmed incidents of  
Compliance › Page 95  
corruption and actions  
taken  
GRI 206: Anti-competitive Behaviour 2016  
206-1  
Legal actions for anti-  
Antitrust compliance › Page 97  
competitive behaviour,  
anti-trust, and  
monopoly practices  
GRI 418: Customer Privacy 2016  
418-1  
Substantiated  
Data protection › Page 97  
complaints concerning  
breaches of customer  
privacy and losses of  
customer data  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
108  
Group Management Report  
Group Management Report 2021/2022  
,
for Energie AG Oberösterreich  
1) 2)  
GROUP  
GENERAL CONDITIONS  
Economic environment3)  
After a dynamic economic recovery in the first months of the reporting period, the  
2021/2022 fiscal year (1 October 2021 to 30 September 2022) at Energie AG  
Oberösterreich (Energie AG) was characterised by a series of crises of a political and economic  
nature. The outbreak of the Russian-Ukrainian war on 24 February 2022 exacerbated existing  
supply chain problems and price increases, provoking an energy and raw materials crisis along  
with a substantial acceleration of inflation, which had already been on the rise beforehand.  
This was followed by the first interest rate rises by the European Central Bank to curb  
historically high inflation. The financial markets expect further increases in key interest rates.  
Given the burgeoning risk of stagflation or recession in the major economies, the conflict of  
interests between fighting inflation and supporting the economy remains intense.  
The Institute for Advanced Studies (IHS), the Institute of Economic Research (WIFO) and the  
International Monetary Fund (IMF) expect economic growth in the range of +2.7% to +3.1%  
for the euro area in 2022 (previous year: +5.3%).  
Current forecasts see growth in the Austrian economy of between +4.7% and +4.8% in  
2022. In the previous year, Austria’s gross domestic product (GDP) growth was +4.6%. The  
high inflation rate, mainly driven by energy and raw material prices is a cause for concern.  
After reaching +2.8% in 2021, the rate is expected to settle at between +7.7% and +8.5%  
in 2022. Having said this, the IMF is of the opinion that inflation rates are likely to peak at the  
end of 2022 in most countries, with inflation expected to remain at significantly elevated  
levels for some time after this.  
For the Czech Republic market relevant to Energie AG, an increase in the gross domestic  
product of between +1.9% and +2.5% is anticipated for the calendar year 2022 (previous  
year: +3.4%).  
1)  
The Group Management Report presented here was prepared in accordance with the requirements of § 267 of the Austrian Commercial Code (UGB)  
and refers to the IFRS consolidated financial statements of Energie AG Oberösterreich in terms of § 245a UGB.  
2)  
In conformity with EU Directive 2014/95/EU on the disclosure of non-financial information and diversity information and its implementation in the  
Austrian Sustainability and Diversity Improvement Act (NaDiVeG 2017), Energie AG prepares the Group Management Report 2021/2022 at the same  
time as the consolidated report on non-financial information (Non-Financial Report) 2021/2022, which is published as part of the Group Annual  
Report 2021/2022 and online at Non-financial report › Page 13  
3)  
Sources: IHS (Institute for Advanced Studies): › Fall Forecast of the Austrian Economy, 2022 – 2023, 7 October 2022. IMF (International  
Monetary Fund): › World Economic Outlook Database: October 2022 (imf.org), 17 October 2022. WIFO (Austrian Institute of Economic  
Research): › WIFO Economic Data – WIFO, 20 October 2022.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
109  
Group Management Report Group  
Economic growth and inflation  
YoY real change (in %)  
Sources: IHS, WIFO, IMF  
Energy and climate policy environment  
In addition to a wide range of agenda decisions in the field of energy and climate policy,  
the reporting period was above all characterised by measures intended to cushion the impact  
of the energy price shock, reduce energy dependency on Russia and improve the security of  
supply.  
The aim of the EU Commission’s “Hydrogen and Gas Market Package”, as presented on  
15 December 2021, is to integrate renewable and decarbonised gases and hydrogen into the  
European legal framework. Moreover, the package includes requirements for regulating and  
unbundling hydrogen networks and strengthening consumer rights.  
On 2 February 2022, the EU Commission released the final wording of the complementary  
delegated act of the EU Taxonomy Regulation on technical assessment criteria for  
electricity and/or heat production with gas-fired power plants and from nuclear energy. The  
act classifies held-to-maturity investments in hydrogen-capable gas-fired power plants which  
continue to be operated with natural gas for a transitional period, and for which very strict  
emission limits were set, as a sustainable transitional activity. The overall objective of the  
Taxonomy Regulation is to redirect capital flows into sustainable investments by classifying  
economic activities in accordance with sustainability criteria.  
In May 2022, the Commission presented its previously announced “REPowerEU package”  
to rapidly reduce dependence on fossil fuel imports from Russia and accelerate the energy  
transition. The package also includes considerations relating to short-term market  
intervention, long-term market design reforms as well as recommendations for preparing for  
a major interruption to the gas supply.  
As part of the “Fit for 55” package, the European Parliament drafted reports on the  
Renewables and Energy Efficiency Directives in September 2022, calling for further  
acceleration in the expansion of electricity generation from renewables and a significant  
increase in energy efficiency ambitions. As early as June 2022, a European Parliament report  
on the revision of the EU emissions trading system was adopted.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
110  
Group Management Report Group  
On 30 September 2022, the Commission’s proposed regulation on emergency  
measures was adopted in the Energy Council of Ministers. The material objective is to  
counteract price increases and relieve the burden on electricity consumers by setting targets  
for reducing electricity demand and for siphoning off and redistributing surplus revenues. The  
measures will come into force on 1 December 2022 and initially apply until 30 June 2023.  
The EU member states will be tasked with their detailed implementation.  
In addition to this, a number of other energy policy directives were adopted at EU level during  
the reporting period. They include the communiqué on dealing with higher energy  
prices (“Toolbox”) and new EU Guidelines on State aid for Climate, Environmental  
protection and Energy (CEEAG).  
In Austria, the federal government and the electricity and gas utilities undertook a number  
of activities during the reporting period to alleviate the social hardship caused by the high  
energy prices. In February 2022, in the scope of the Electricity Industry and Organisation  
Act 2010 (ElWOG), the National Council also standardised a legal entitlement for  
households and small businesses to instalment payments, in the face of additional payments  
for the annual electricity bill. On 7 September 2022, Austria’s federal government presented  
plans for an electricity cost subsidy law to ease the burden on household customers. This  
“electricity price cap” is intended to provide financial relief for basic consumption of up to  
2,900 kWh per metering point for the period from 1 December 2022 to 30 June 2024.  
In January 2022, the Austrian National Council ratified the eco-social tax reform, thereby  
introducing national CO2 pricing for petrol, diesel, heating oil, coal and natural gas. The  
associated National Emissions Allowance Trading Act provides for graded CO2 pricing of  
sectors outside the EU emissions trading scheme, with this taxation to be offset by a climate  
bonus and other relief measures. The enactment planned for July 2022 was postponed to  
1 October 2022 by a resolution of the National Council.  
Also in January 2022, a minor amendment to the Renewable Energy Expansion Act (EAG)  
was passed in order to address previous state aid concerns voiced by the EU Commission. In  
April 2022, the first regulation for investment subsidies accompanying the EAG was  
adopted with details of subsidies for small photovoltaic, wind and hydropower plants.  
Three amendments to the Gas Industry Act stipulated, among other things, the  
establishment of a strategic gas reserve of 20 TWh by November 2022 and a set of  
instruments for the procurement of balancing energy with mandatory storage (Market  
Maker). The last amendment introduced a “use it or lose it” principle for systematically  
unused storage capacities, requiring all gas storage facilities on Austrian territory to be  
connected to the Austrian gas grid.  
As an economic steering act to be applied in a crisis situation, the amendment to the Energy  
Steering Act from June 2022 governs compensation for asset impairments in the case of  
steering measures for gas and electricity. On top of this, large consumers can now voluntarily  
store gas volumes, 50% of which are protected against expropriation in the event of steering.  
To further secure the gas supply in Austria, a Natural Gas Steering Measures Regulation  
was submitted for review in July 2022. This is intended to create the conditions for natural  
gas substitution with fuels such as coal, oil, or biomass for large consumers, district heating  
companies, and combined heat and power (CHP) plant operators subject to mandatory  
steering. A resolution has yet to be passed.  
The Gas Diversification Act was adopted at the end of June 2022 in order to cushion the  
additional costs of diversifying the procurement of natural gas from non-Russian sources and  
of converting plants for generating electricity, heat and/or cooling to alternative modes of  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
111  
Group Management Report Group  
operation. An amendment in July also provides additional financial support for switching  
from gas to other fossil fuels.  
A consultation draft for an amended Environmental Impact Assessment Act (UVP-G) was  
published on 25 July 2022. The aim of the amendment is to accelerate projects needed in the  
scope of the energy transition. Particular attention was paid to avoiding redundant audits and  
to improving the way in which procedures are structured, including the setting of deadlines  
by the authority. A further material proposal is that of considering the state of the art at the  
time a project is launched instead of that at the time of the decision as authoritative. This  
would lead to a differentiated view of the projects, especially in the case of renewable energy  
generation plants, prompted by rapid technological progress.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
112  
Business development in the Group  
BUSINESS DEVELOPMENT IN THE GROUP  
Assets, liabilities, financial position and profit or loss 1)  
Group overview  
Unit  
2021/2022  
2020/2021  
Change  
Sales revenues  
EUR mill.  
4,002.1  
2,145.2  
86.6%  
Operating result (EBIT)  
EUR mill.  
150.6  
188.4  
-20.1%  
EBIT margin  
%
3.8  
8.8  
-56.8%  
Financial result  
EUR mill.  
-28.7  
-20.1  
-42.8%  
Earnings before taxes  
EUR mill.  
121.9  
168.3  
-27.6%  
Balance sheet total  
EUR mill.  
6,912.7  
3,875.4  
78.4%  
Equity  
EUR mill.  
1,794.5  
1,535.8  
16.8%  
Equity ratio  
%
26.0  
39.6  
-34.3%  
Net debt 1)  
EUR mill.  
606.8  
718.8  
-15.6%  
Net gearing 2)  
%
33.8  
46.8  
-27.8%  
Investments in property, plant and equipment and intangible  
assets  
EUR mill.  
201.2  
215.1  
-6.5%  
Cash flow from operating activities  
EUR mill.  
1,136.5  
378.7  
> +100%  
Cash flow from investing activities  
EUR mill.  
-340.3  
-215.2  
-58.1%  
Cash flow from financing activities  
EUR mill.  
-86.1  
9.2  
> -100%  
ROCE  
%
6.9  
6.8  
1.5%  
WACC  
%
4.7  
4.0  
17.5%  
1) The key figure net debt represents the net financial liabilities and is calculated by Energie AG Group as follows: Net debt = non-current financial liabilities + current financial  
liabilities (incl. pending margin payments) – cash and cash equivalents (cash, cheques, credit balances with banks). The previous year's figures have been restated to reflect a  
change in calculation methods.  
2) The key figure net gearing was developed from the key figure debt-equity ratio. While the key figure debt-equity ratio measures the ratio between debt capital and equity, the  
key figure net gearing juxtaposes the net debt (current and non-current financial liabilities (incl. pending margin payments) less cash and cash equivalents) against the equity.  
The previous year's figures have been restated to reflect a change in calculation methods.  
The 2021/2022 fiscal year was characterised by very high and strongly fluctuating market  
prices for electricity and gas. Sales revenues of EUR 4,002.1 million (previous year:  
EUR 2,145.2 million) and an operating result of EUR 150.6 million (previous year:  
EUR 188.4 million) were generated in the reporting period.  
The increase in sales revenues was mainly due to the sky-rocketing wholesale prices for  
electricity and gas, which led to higher revenue in the management of power plants and  
electricity procurement rights, in energy trading and in sales. In addition to the Energy  
Segment, increases in turnover were also achieved in virtually all other segments.  
The balance sheet total increased by EUR 3,037.3 million from EUR 3,875.4 million to  
EUR 6,912.7 million. The increase primarily resulted from higher fair values of derivative  
financial instruments, receivables due to collateral provided for derivative financial  
instruments, and higher cash and cash equivalents. In the previous year, the operational unit  
“Fibre to the home” (FTTH) was recognised separately in the balance sheet item “Non-  
current assets held for sale” in line with IFRS 5. In the 2021/2022 fiscal year, the operational  
1)  
With regard to the derivation of the financial performance indicators and the calculation methods, please refer, in addition to the explanations in the  
Consolidated Financial Statements › Page 148  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
113  
Group Management Report Group  
unit was transferred to BBOÖ Breitband Oberösterreich GmbH (BBOÖ GmbH); the share in  
this joint venture is 50%.  
The EBIT in the Energy Segment amounted to EUR 18.8 million in the reporting period  
(previous year: EUR 82.4 million). Earnings contributions from the operation of thermal  
generation plants in particular had a positive impact. Additionally, a reversal of impairment in  
the amount of EUR 4.1 million was recognised for the Timelkam combined cycle gas turbine  
(CCGT) power plant in the reporting period. However, the positive effects were more than  
offset by the significantly lower water level compared with the previous year (hydro  
coefficient: 0.88; previous year: 0.94) and by sharp increases in procurement prices for  
electricity and gas.  
In the Grid Segment, the operative result was EUR 45.3 million (previous year:  
EUR 37.2 million). The increase in earnings is attributable to the contribution of the Metering  
Services operational unit (previously part of the Holding & Services Segment) and to  
operational improvements in earnings.  
The Waste Management Segment generated an EBIT of EUR 33.9 million (previous year:  
EUR 29.6 million). Favourable market conditions and higher electricity and heat revenues  
contributed to this increase.  
In the Czech Republic Segment, an operating result in the amount of EUR 6.0 million was  
generated in the reporting period (previous year: EUR 11.1 million). The lower operating  
result was due in particular to significantly higher costs for the procurement of electricity and  
gas compared with the previous year.  
The operating result of the Holding & Services Segment amounted to EUR 46.6 million in  
the reporting period (previous year: EUR 28.1 million). The result for the 2021/2022 fiscal year  
includes earnings of EUR 37.0 million from the spin-off of the “Fiber to the home (FTTH)”  
operational unit. In addition, a reversal of impairment of EUR 3.5 million was recognised in  
the reporting period for the subsidiary Wels Strom GmbH, which is accounted for using the  
equity method. The transfer of the Metering Services operational unit to the Grid Segment  
had a negative impact on the result.  
Investments in intangible assets and property, plant and equipment by Segments  
2021/2022; previous year’s figures in brackets  
In the fiscal year 2021/2022, investments in intangible assets and property, plant and  
equipment amounted to EUR 201.2 million, and were thus EUR 13.9 million or 6.5% below  
the previous year’s level (EUR 215.1 million). With a share of 57.4%, the Grid Segment  
accounted for the largest part.  
Net debt (non-current and current financial liabilities minus cash and cash equivalents) fell by  
EUR 112.0 million year-on-year from EUR 718.8 million to EUR 606.8 million. Net debt  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
114  
Group Management Report Group  
includes margin payments received from derivatives that will result in a cash outflow in the  
next few years.  
Cash flow from operating activities in the 2021/2022 fiscal year was EUR 1,136.5 million,  
compared with EUR 378.7 million in the previous year. The increase is particularly due to  
inflows from derivative financial instruments.  
The financial result changed from EUR -20.1 million in the previous year to  
EUR -28.7 million in the 2021/2022 fiscal year. This development is attributable to higher  
interest expenses and losses on remeasurement of securities.  
Funding and investment strategy  
The main focus of the funding and investment strategy of Energie AG continues to be on  
comprehensively maintaining the solvency of the Group at all times and on maintaining the  
Group’s good credit rating. Financial stability is of essential importance, especially in a phase  
of the greatest uncertainty with regard to the economic environment – particularly  
accentuated by massive distortions on the energy trading markets.  
The conservative orientation of the funding and investment strategy essentially rests on three  
pillars here:  
Securing a sustainably strong credit rating  
In February 2022, Energie AG again had its very good credit rating “A” confirmed by  
Standard and Poor’s. The “stable” rating outlook was also sustained. This strong credit rating  
enables the Group to obtain access to funding at optimal cost at any time, and to draw on a  
variety of different funding sources.  
Stable and future-proof finances  
Financial liabilities were reduced by EUR 9.6 million to EUR 660.5 million in the past fiscal year  
(previous year: 670.1 million). The Group’s repayment profile is characterised by bullet loans  
with residual terms of up to 28 years. A significant refunding requirement will not arise again  
until the 2024/2025 fiscal year due to the scheduled repayment of a EUR 300 million bond.  
As of 30 September 2022, the Energie AG Group had EUR 929.4 million (previous year:  
219.2 million) in cash and cash equivalents. Beyond this, as of the reporting date, the Group  
had EUR 273.5 million (previous year: EUR 105.8 million) in fixed-term deposits and short-  
term investments, which are held as a strategic liquidity reserve. The risk profile of the  
strategic liquidity reserve is extremely conservative – a large proportion is held in cash or cash-  
equivalent instruments.  
In addition to these financial reserves from cash and cash equivalents as well as marketable  
securities, Energie AG had EUR 700.0 million (previous year: EUR 315.0 million) in partly  
committed credit lines with Austrian and international banks as of 30 September 2022,  
which had not been utilised as of the reporting date. The very high level of cash and cash  
equivalents compared with the previous years is mainly attributable to cash inflows from  
hedging transactions in electricity and gas trading. In the context of the sharp rise in energy  
prices and price volatility, the volumes of security deposits in energy trading have been  
significantly expanded. In view of the present turbulence on the markets, Energie AG  
regularly carries out stress tests in order to assess the impact of extreme market movements  
on the Group’s liquidity requirements and to be able to prepare for them.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
115  
Group Management Report Group  
Central Group funding  
Group-internal funding management is handled centrally by Energie AG Group  
Treasury GmbH (Group Treasury GmbH). Financing within the Group is generally centralised,  
with the required funds being passed on to the Group companies at market conditions and in  
line with their requirements. In the short term, the liquidity of the Austrian Group companies  
is managed in the scope of a state-of-the-art cash pooling system. As of 30 September 2022,  
27 Group companies are involved in Group cash pooling, with Group Treasury GmbH acting  
as the pooling centre.  
Value-based corporate management and capital costs  
Energie AG’s value management strategy is an instrument for measuring and controlling the  
economic success of the Group’s business activities. It serves to assess the attractiveness of  
investing activities and secures the company value as well as generating a capital market-  
oriented return for the owners. Along with the operating result, the weighted average cost of  
capital (WACC) is of essential importance. The WACC value serves as the basis for  
determining the minimum yield requirements for Group management and is therefore used  
as a yardstick for value generation in the Company.  
Energie AG calculates the cost of capital as the weighted average of equity and borrowing  
costs. The cost of equity is determined using the capital asset pricing model (CAPM).  
Calculations take into account the risk-free interest rate, a country risk premium, a market  
risk premium and a beta factor. Borrowing costs are composed of the risk-free interest rate, a  
country risk premium and the credit spreads of the peer group. The parameters specified by  
the regulatory authority are used for the regulated business units. The capital costs of the  
business units with activities on non-regulated markets are determined using the reporting-  
date principle and based on market conditions. In a further step, the bottom-up method is  
used to weigh these costs up unto the Segment and Group capital costs.  
This WACC method is subjected to on-going evaluation taking current publications and  
expert opinions into consideration. Adaptations are made as needed. Moreover, the costs of  
capital are continuously monitored against the background of a volatile financial market  
environment. The consolidated WACC value for the 2021/2022 fiscal year was 4.7%  
(previous year: 4.0%).  
Along with the operating result, one of the most important key indicators for the Group’s  
internal management is the ROCE (Return on Capital Employed), which indicates how  
efficiently and profitably the available capital is utilised. The ROCE is calculated as the  
quotient of Net Operating Profit After Tax (NOPAT) and average Capital Employed.  
The NOPAT key indicator denotes the taxed profit from operating activities excluding the at  
equity result of associated companies. One-time effects such as impairments and market  
valuations are taken into account and are included in the NOPAT. When calculating taxes, all  
at equity income is eliminated from the tax base, as the former is already adjusted for taxes.  
The capital employed is derived by subtracting the non-productive assets and non-interest-  
bearing liabilities from the average total assets. It reflects the interest-bearing capital pooled  
in the company. The average capital employed (ø CE) is calculated as the average of the total  
capital employed of the last two fiscal years. Capital employed includes the carrying amount  
of the investments accounted for using the equity method, excluding the associated strategic  
investments. For information on Capital Employed, please refer to the Notes to the  
Consolidated Financial Statements, section 7. Segment reporting › Page 176.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
116  
Group Management Report Group  
The goal of the Energie AG Group is to generate an ROCE above the WACC through  
consistent value-oriented corporate management and control. The ROCE minus the WACC  
results in the relative value contribution. The absolute value added is calculated by multiplying  
it by the capital employed. In addition to the development of operating earnings, the level of  
ROCE and value added specifically depends on the capital employed. The NOPAT key  
indicator corresponds to EBIT less related taxes and other items, amounting to a total of  
EUR 97.7 million.  
In the Energie AG Group, in addition to strategic considerations, resources for future capital  
investments and acquisitions are allocated by prioritising projects exclusively on the basis of  
the presented value-oriented criteria and methods.  
In the 2021/2022 fiscal year, the ROCE of the Energie AG Group was 6.9%, 0.1 percentage  
points above the previous year (6.8%).  
Treasury stocks  
By resolution of the Annual General Meeting on 17 December 2021, the share capital of  
Energie AG Oberösterreich was reduced by EUR 1,224.00 from EUR 88,653,782.00 to  
EUR 88,652,558.00 by means of a simplified capital reduction by cancellation of 1,224 no-  
par value registered shares of treasury stock in the form of non-voting preferred shares. As a  
result, § 4 of the Company’s Articles of Association was amended accordingly.  
In certain cases, the Energie AG Oberösterreich employee stock option plan provides for the  
right or the obligation to purchase Energie AG employee shares. In fiscal year 2021/2022, the  
following changes in treasury stock resulted from this security:  
Treasury stocks  
Share in  
Share in  
Treasury stocks  
capital stock  
capital stock  
Shares  
%
EUR 1,000  
Treasury stocks as of 30.09.2021  
1,224  
0.001  
1.2  
Disposals 2021/2022  
-1,224  
-0.001  
-1.2  
Additions 2021/2022  
808  
0.001  
0.8  
Treasury stocks as of 30.09.2022  
808  
0.001  
0.8  
Related party disclosures  
For Energie AG’s transactions with related parties in the reporting period, please refer to the  
disclosures in the Notes to the Consolidated Financial Statements, Section 36. Related  
party disclosures › Page 240.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
117  
Group Management Report Group  
Changes under corporate law  
In the scope of bundling broadband activities in Upper Austria, the “Operations Layer 1”  
and “Operations Layer 2” operational units of Energie AG Oberösterreich Telekom GmbH  
(Telekom GmbH) were spun off for inclusion in Energie AG Oberösterreich under the  
demerger and acquisition agreement of 4 March 2022. The two operational units, including  
“Assets Layer 1”, were subsequently spun off from Energie AG Oberösterreich for inclusion in  
OÖ Breitband Infrastruktur GmbH, established in September 2021. The entity was renamed  
to Breitband Oberösterreich Infrastruktur GmbH.  
The next step was to transfer Energie AG Oberösterreich’s entire investment in Breitband  
Oberösterreich Infrastruktur GmbH to Fiber Service OÖ GmbH, which was renamed BBOÖ  
Breitband Oberösterreich GmbH, in return for a 50% participating interest in the latter.  
Energie AG Oberösterreich and OÖ Landesholding GmbH now each hold half of the shares in  
BBOÖ Breitband Oberösterreich GmbH.  
Additionally, the “Operation Layer 2” operational unit was spun off from Breitband  
Oberösterreich Infrastruktur GmbH for integration with BBOÖ Breitband  
Oberösterreich GmbH. Furthermore, the “Operation Layer 1” operational unit, including  
“Assets Layer 1” of BBOÖ Breitband Oberösterreich GmbH, was integrated with Breitband  
Oberösterreich Infrastruktur GmbH in the form of a shareholder contribution.  
Erdgas Oberösterreich Vertriebs GmbH, which operates on the German market, was sold  
by Energie AG Oberösterreich Vertrieb GmbH (Vertrieb GmbH) to Energie AG Oberösterreich  
Tech Services GmbH (Tech Services GmbH) with a closing date of 15 September 2022.  
As of 31 December 2021, all shares in Oberösterreichische Gemeinnützige Bau- und  
Wohngesellschaft mbH were sold to LAWOG – Gemeinnützige  
Landeswohnungsgenossenschaft für Oberösterreich eingetragene Genossenschaft mit  
beschränkter Haftung – and GVVG gemeinnützige Vermietungs- und  
Verwaltungsgesellschaft m.b.H.  
With a view to bundling heat activities in West Bohemia, the entities Energie AG Teplo  
Rokycany s.r.o. and Tepelné zásobování Rakovník, spol. s.r.o. were merged into Energie AG  
Teplo Bohemia s.r.o. on 1 October 2021.  
In addition to this, Energie AG Bohemia s.r.o. acquired a 100% holding in Czech heat  
company RATE s.r.o. on 3 January 2022.  
With a closing date of 2 August 2022, all shares in VAK Zápy s.r.o. were sold by Energie AG  
Bohemia s.r.o. to VAK Beroun a.s. VAK Zápy s.r.o. was merged with VAK Beroun a.s. at the  
start of the 2022/2023 fiscal year.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
118  
Group Management Report Group  
Trend in staff levels  
In the 2021/2022 fiscal year, the Group’s average consolidated workforce stood at 4,606 full  
time equivalents (FTE), thus representing an increase of 0.3% (13 FTE) over the average of the  
2020/2021 fiscal year (4,593 FTE).  
The increase in the Grid Segment and the decrease in the Holding & Services Segment  
primarily result from the transfer of the Metering Services division from Telekom GmbH to  
Netz Oberösterreich GmbH (Netz OÖ GmbH).  
Staff levels 1)  
Unit  
2021/2022  
2020/2021  
Change  
Energy Segment  
FTE  
459  
464  
-1.1%  
Grid Segment  
FTE  
582  
535  
8.8%  
Waste Management Segment  
FTE  
831  
821  
1.2%  
Czech Republic Segment  
FTE  
1,715  
1,718  
-0.2%  
Holding & Services Segment  
FTE  
1,019  
1,055  
-3.4%  
Group total  
FTE  
4,606  
4,593  
0.3%  
1) yearly average of the fully-consolidated and proportionately consolidated entities  
Change in the Management Board  
The Supervisory Board on 30 June 2022 appointed Dr. Leonhard Schitter M.A. to the  
Management Board for the period from 1 January 2023 to 31 December 2027 in the  
function of Board Member for Sales and Marketing. In this function he will take over from  
the current Chief Executive Officer DDr. Werner Steinecker MBA, who will retire at the end of  
the 2022 calendar year, and become the new Chairman of the Management Board of  
Energie AG.  
The Supervisory Board further reappointed Management Board Member KR Mag. Dr. Andreas  
Kolar in the function of Chief Financial Officer until 31 December 2025 as well as  
Management Board Member Dipl. Ing. Stefan Stallinger MBA as Chief Technology Officer  
until 31 December 2027.  
Thanks to the board members’ extensive knowledge of the company and industry it operates  
in, this new composition of the Management Board will assure the Group’s continuous  
further development.  
INTERNAL CONTROL SYSTEM  
The internal control system (ICS) is a process embedded in the work and operating  
procedures of the Energie AG Group which is being implemented by management and staff  
in order to identify and control existing risks and to be able to ensure with sufficient certainty  
that the following general objectives are achieved in the course of fulfilling the tasks of the  
Group:  
Effectiveness and efficiency of business activities  
Regularity and reliability of internal and external reporting  
Compliance with the internal regulations applicable to the Company and the pertinent  
legal provisions, in particular for the accounting process  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
119  
Group Management Report Group  
In the Energie AG Group, the roles “Group Treasury”, “Group Accounting” and “Controlling  
and Risk Management” have been established as company holding roles. The “Accounting”  
department acts as a service provider for the entire Group and is established in scope of  
Energie AG Oberösterreich Business Services GmbH (Business Services GmbH). The basis for  
the valid financial reporting is a strongly IT-supported process as well as a high degree of  
standardisation in data acquisition and processing, starting with commercial services, through  
the preparation of the companies’ annual reports, to consolidation in the consolidated  
financial statements. The above-mentioned functions thus form the core of the ICS control  
environment with regard to the accounting process.  
The core processes of the above-mentioned divisions, and the process-inherent material  
risks along with the appropriate controls, are documented and recorded using a suitable IT  
tool. Since the 2020/2021 fiscal year, this IT tool links the areas of quality, safety and  
environmental management (QSE), ICS, data protection, risk management and information  
and communication technology (ICT) risks and has established itself as a valuable information  
system for managers and employees.  
The concrete design of the controls is adapted to individual requirements which adequately  
consider risks and can include both manual and automated components. The dual control  
principle is strictly applied to approval processes. Conflicts of functional separation are  
avoided and monitored by compensatory controls.  
Continuous monitoring and a cyclical audit of the design and effectiveness of the controls  
by Group Internal Audit form the basis of quality validation and monitoring for these  
systems throughout the Group.  
Structured, standardised reporting to the Management Board and supervisory bodies  
ensures that the legally prescribed monitoring tasks are performed.  
Control awareness is well anchored in the operating units and is sustainably implemented in  
the business processes. In addition, maintaining and strengthening risk awareness and  
awareness of the importance of the ethical values laid down in the vision and mission  
statement is an essential component of the corporate governance culture.  
The legal obligation to equal treatment in accordance with ElWOG and GWG 2011 (Natural  
Gas Act) are subject to appropriate ICS controls and are monitored by the Equal Treatment  
Officer.  
The ICS thus satisfied the statutory requirements in the year under review.  
RISKS AND OPPORTUNITIES  
Energie AG’s risks and opportunities situation was strongly influenced in the  
fiscal year 2021/2022 by the tense economic environment for the energy sector and the  
energy policy. There was a noticeable increase in the volatility of electricity and gas prices on  
the markets. New all-time highs were continuously reported. These developments were  
aggravated by both direct and indirect effects due to the Russian-Ukrainian war and the  
inflationary economic environment. Further to this, the climatic conditions and general  
climate policy, the potential further impact of the COVID-19 pandemic, and imminent  
regulatory changes have a significant impact on the risks and opportunities of Energie AG.  
Also, the details of the impact of the national implementation of the EU Emergency Measures  
Regulation on the absorption and redistribution of surplus proceeds as stipulated by the EU  
Commission cannot be predicted at this time.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
120  
Group Management Report Group  
At the end of February 2022, a separate task force was established at Energie AG in order to  
continuously monitor and assess the risk of a potential gas shortage, attributable for the most  
part to the Russian-Ukrainian war. Situation reports are prepared at regular intervals,  
contractual relationships are analysed, and any risks are noted. Energie AG received its  
purchased gas volumes on schedule during the reporting period and was able to fill its own  
storage facilities to over 90% by the end of the 2021/2022 fiscal year.  
The typical risks associated with operating activities (fluctuations in electricity prices or the  
water level) proved to be higher in the course of the fiscal year 2021/2022 than in previous  
years due to price increases. At the same time, however, the opportunities arising from these  
issues increased. Energie AG relies on targeted strategic and operational measures to  
minimise or mitigate these risks and to leverage opportunities in the best possible way.  
Within the scope of ordinary activities, there is also the risk of trading partners not being able  
to meet their financial obligations in good time or defaulting altogether. Counterparty risk  
management at Energie AG focuses on particularly careful monitoring of counterparty limits/  
exposures and the implementation of risk mitigation measures.  
The reliability of medium- to long-term forecasts is currently limited due to volatile energy  
markets and uncertainties in energy policy. In the Energie AG Group, however, no risks were  
identified in the fiscal year 2021/2022 that, either individually or collectively, would have the  
potential to jeopardize the continued existence of the Company.  
For more details on the risks and opportunities situation, see the Notes to the Consolidated  
Financial Statements, Section 35. Risk management. › Page 234  
RESEARCH, DEVELOPMENT AND INNOVATION  
The topics of research, development and innovation are significant elements in bolstering  
Energie AG for future challenges. Numerous projects were successfully completed in the  
fiscal year 2021/2022.  
The climate targets at a European and Austrian level are increasingly being concretised with  
derivations and regulations, giving rise to new topics and fields of research. The hydrogen  
technology activities launched in the past fiscal years are seeing continual further  
development. Hydrogen will be of great importance in the future to support the shift of  
renewable electricity production from summer to winter and decarbonisation in industry.  
Energie AG is aware of the importance of a supply security for its customers, and its social  
responsibility for future generations. For this reason, projects to bolster the resilience of the  
energy system and provide efficient customer services are being driven forward proactively  
and with a high level of commitment in all areas of the Group. Digitalisation and  
automation play a central role here. Good networking, and intensive cooperation with  
partners from science and industry on research, development and innovation, are the building  
blocks for a successful exchange with valuable mutual benefits.  
Since 1 October 2019, “innovation”, an important issue for the future, has been actively  
promoted by Wertstatt 8 GmbH. This wholly owned subsidiary focuses its activities on the  
development of digital solutions and innovative business models relating to energy and the  
environment. In the fiscal year 2021/2022, the focus in this sector was primarily on  
developing new business ideas. To allow this to happen, platform economy and business  
ecosystem expertise was established, among other things, and intensive customer research  
was stepped up. To test these business ideas, several digital prototypes and deliberately small-  
scale field tests were implemented to gain initial experience in the market.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
121  
Group Management Report Group  
R&D&I key performance indicators  
Unit  
2021/2022  
2020/2021  
Change  
Number of R&D&I projects in the Group  
Number  
103  
128  
-19.5%  
Staff in R&D&I projects  
FTE  
56.3  
58.9  
-4.4%  
R&D&I expenses in the Group  
EUR mill.  
5.3  
5.5  
-3.6%  
In fiscal year 2021/2022, research, development and innovation were pursued in the  
following projects (non-exhaustive list):  
Carbon Cycle Economy Demonstration (CCED)  
The “Carbon Cycle Economy Demonstration” project focuses on the sustainable  
implementation of a circular economy for CO2. This involves investigating a number of  
different options for a further use of carbon dioxide taken from the atmosphere or  
manufacturing processes for energy purposes with the help of hydrogen. In this way, it may  
be possible to decisively reduce emissions of climate-damaging gases. Energie AG is involved  
with field trials at its biogas plant in Engerwitzdorf. This project is expected to further boost  
the efficiency and environmental friendliness of the plant.  
Industry4Redispatch  
Volatility in the electricity grid caused by further expansion of renewable energies, and  
dynamic energy prices to match, are leading to growing demands on the electricity grid  
infrastructure in transmission and distribution grids. The “Industry4Redispatch” research  
project, which was launched in the 2020/2021 fiscal year, focuses on leveraging the potential  
of load flexibility in large and medium-sized industrial operations. The aim is to use the  
identified flexibility to replace the use of power plants for redispatching (= interventions in  
generation output to avoid power grid overloads) on the Austrian electricity transmission  
grid. In the current project phase, Netz OÖ GmbH is collaborating with several distribution  
system operators, the Austrian transmission system operator and other partners from the  
fields of research and automation technology to develop a suitable procedure that will enable  
offers from the electricity distribution system, including analysis of the corresponding required  
grid capacity.  
SSCCS – Secure Supply Chains for Critical Systems  
The aim of the “Secure Supply Chains for Critical Systems” (SSCCS) project is to improve the  
resilience and reliability of delivery chains against cyber attacks. Based on appropriate analysis  
and documentation of the supply chains, supply chains are investigated for vulnerabilities  
relating to cyber security and corresponding measures are developed to improve resilience.  
One key feature of the project is the shift away from a purely technical perspective towards  
the integration of various attack vectors and vulnerabilities along the supply chain.  
Furthermore, an exchange of experience and know-how transfer between the project  
partners in various industries is planned.  
Predictive maintenance  
Establishing a predictive maintenance strategy at hydropower plants is one project from  
Energie AG’s digitalisation and automation initiative. Energie AG Oberösterreich  
Erzeugung GmbH is striving to develop a strategy for data-based decision support in  
operations management and maintenance. Development work on a dashboard for a pilot  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
122  
Group Management Report Group  
power plant began in the reporting period with a view to conducting and evaluating field  
trials.  
KEY PERFORMANCE INDICATORS  
Group overview  
Unit  
2021/2022  
2020/2021  
Change  
Electricity procurement  
GWh  
14,096  
16,509  
-14.6%  
Electricity procured from third parties  
GWh  
10,519  
13,340  
-21.1%  
Proprietary electricity procurement 1)  
GWh  
3,577  
3,169  
12.9%  
Thermal power plants  
GWh  
1,135  
583  
94.7%  
Renewable energy  
GWh  
2,442  
2,586  
-5.6%  
Group's own hydropower plants  
GWh  
1,046  
1,096  
-4.6%  
Procurement rights from hydroelectric power  
GWh  
1,186  
1,285  
-7.7%  
Other renewable energy (photovoltaics, wind, biomass)  
GWh  
210  
205  
2.4%  
Electricity grid distribution volume to end customers  
GWh  
8,118  
8,231  
-1.4%  
Electricity sales volume 2)  
GWh  
6,621  
6,990  
-5.3%  
Gas grid distribution volume to end customers  
GWh  
19,592  
19,379  
1.1%  
Gas sales volume  
GWh  
5,461  
6,407  
-14.8%  
Heat procurement  
GWh  
1,753  
1,796  
-2.4%  
Heat sales volume  
GWh  
1,619  
1,663  
-2.6%  
Total waste volume handled 3)  
1,000 t  
1,575  
1,701  
-7.4%  
Incinerated waste volume  
1,000 t  
591  
586  
0.9%  
Invoiced drinking water volume  
m3 mill.  
58.2  
57.2  
1.7%  
Invoiced waste water volume  
m3 mill.  
45.2  
45.1  
0.2%  
Length of fibre-optic network 4)  
km  
5,820  
7,021  
-17.1%  
1) of which in the fiscal year 2021/2022 3,574 GWh on the domestic market (previous year: 3,167 GWh)  
2) of which in the fiscal year 2021/2022 4,975 GWh distribution to consumers on the domestic market (previous year: 5,265 GWh)  
3) Previous year's value restated  
4)  
Revaluation due to spinning off the fiber-to-the-home (FTTH) fibre-optic network, see section Changes under corporate law › Page 117 and section Holding & Services  
Segment › Page 140  
Unless otherwise stated, the key performance indicators given in the following segment  
report always refer to the respective segment.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
123  
Group Management Report Segments  
SEGMENTS  
In accordance with internal reporting and pursuant to IFRS 8 “Operating segments”, the  
Energy, Grid, Waste Management, Czech Republic and Holding & Services Segments will be  
reported on in the Notes to the Consolidated Financial Statements, Section 7. Segment  
reporting › Page 176.  
Segment name  
Activities included  
Energy  
Production, trade and sales of electricity, gas, heat and telecommunications services  
Grid  
Construction and operation of the electricity and gas grids, incl. metering services  
Waste Management  
Acceptance, sorting, waste incineration and landfilling of residuals  
Czech Republic  
Supplying drinking water, waste water management, and supplying heat in the Czech Republic  
Holding & Services  
Telecommunications, service companies and management functions; associated at-equity companies  
which are not allocated to other segments  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
124  
Group Management Report Energy Segment  
ENERGY SEGMENT  
Energy Segment overview  
Unit  
2021/2022  
2020/2021  
Change  
Total sales  
EUR mill.  
3,139.2  
1,346.1  
> +100%  
EBIT  
EUR mill.  
18.8  
82.4  
-77.2%  
Investments in property, plant and equipment and intangible  
assets  
EUR mill.  
24.5  
25.2  
-2.8%  
Workforce (on average)  
FTE  
459  
464  
-1.1%  
Electricity procurement, incl. third-party procurement  
GWh  
13,898  
16,315  
-14.8%  
Proprietary electricity procurement  
GWh  
3,379  
2,975  
13.6%  
Electricity sales volume  
GWh  
6,621  
6,990  
-5.3%  
Gas sales volume  
GWh  
5,461  
6,407  
-14.8%  
Heat procurement  
GWh  
1,288  
1,355  
-4.9%  
Heat sales volume  
GWh  
1,178  
1,240  
-5.0%  
ECONOMIC ENVIRONMENT FOR THE ENERGY SECTOR 1)  
Price development on international energy markets  
Sources: EEX, ICE  
1)  
Sources: EEX (European Energy Exchange AG) market data: › Market data (eex.com). ICE (Intercontinental Currency Ex-change) market data:  
› Products - Futures & Options | ICE (theice.com)  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
125  
Group Management Report Energy Segment  
The forward market prices for electricity for delivery in 2023 in Austria showed a massive  
upward trend especially in the summer of 2022. The main factor influencing this was the  
price of gas, influenced by uncertainties surrounding the Russian-Ukrainian war and the  
associated reduction in supplies from Russia, and worries relating to the supply situation.  
Starting at around EUR 90.0/MWh at the beginning of the reporting period, electricity prices  
moved steeply upwards. The price for the annual base of 2023 in the price zone Austria  
reached its highest value on 26 August 2022 at EUR 1,015.0/MWh. The average price was  
EUR 247.3/MWh in the 2021/2022 fiscal year. On the spot market, electricity prices rose by  
around 300% compared with the same period of the previous year. The average European  
Power Exchange (EPEX) spot price base for delivery in Austria in the reporting period was  
EUR 259.5/MWh with a volatile development and with prices rising sharply from what was  
already a high starting level in the summer of 2022.  
The oil price for delivery in December 2022 rose from a low of USD 66.0/barrel of Brent  
crude oil at the end of November 2021 to peak at USD 114.2/barrel on 8 June 2022. Up to  
February 2022, the increase can be explained by the global economic upswing following the  
slump caused by the COVID-19 pandemic; from February, the effects of the Russian-  
Ukrainian war predominated.  
In the autumn of 2021, the price increase for natural gas was still attributed to uncertainties  
in connection with the commissioning of the Nord-Stream 2 gas pipeline and the initially  
good economic outlook. From February 2022, the decline in gas supplies from Russia and  
increased demand as European gas storage facilities were filled led to a steep rise in prices.  
The Trading Hub Europe (THE) gas price for the front year 2023 rose in the fiscal year  
2021/2022 from around EUR 32.0/MWh at the beginning of October 2021, peaking at  
EUR 314.4/MWh on 26 August 2022, to EUR 185.6/MWh by the end of September 2022,  
showing lateral movement in the last few weeks of the reporting period.  
In the reporting period, prices for CO2 emission allowances fluctuated between EUR 54.9/t  
and EUR 98.0/t. After a continuous increase in prices up to February 2022 as a result of high  
demand, there was a slump at the beginning of the Russian-Ukrainian war due to  
uncertainties regarding economic developments. Subsequently, demand for electricity  
generation again caused CO2 prices to rise, with a need to compensate for low production  
levels from hydroelectric and nuclear power plants by increased use of coal and gas-fired  
power plants.  
BUSINESS DEVELOPMENT IN THE ENERGY SEGMENT  
In the 2021/2022 fiscal year, sales revenues in the Energy Segment amounted to  
EUR 3,139.2 million. The notable increase compared to the same period of the previous year  
(EUR 1,346.1 million) is attributable to the significant increase in wholesale prices for  
electricity and gas, which lead to higher sales revenues in energy trading, in the sale of  
electricity and gas as well as in the management of power plants and electricity procurement  
rights.  
In the reporting period, the EBIT of the Energy Segment amounted to EUR 18.8 million and  
was 77.2% below the level of the previous year (EUR 82.4 million). The decline was mainly  
caused by below-average electricity generation from hydropower plants due to low river  
water levels. In sales, the sharp rise in procurement prices for electricity and gas not only had  
a negative impact on EBIT in the Energy Segment but also triggered the recognition of risks in  
the form of provisions.  
The use of the CCGT power plant in Timelkam on the electricity market, on the other hand,  
had a positive effect on the operating result. Further details on the thermal power plants can  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
126  
Group Management Report Energy Segment  
be found in the Notes to the Consolidated Financial Statements, section 24.1. Derivative  
financial instruments and hedging › Page 197.  
Besides this, contributions to results from the management of the gas storage facilities also  
improved, although a provision of EUR 6.8 million for the 7Fields gas storage facility had been  
recognised in the previous year.  
Due to higher expectations of future earnings contributions, an impairment reversal in the  
amount of EUR 4.1 million was recognised for the Timelkam CCGT power plant in the  
reporting period. The previous year’s EBIT included reversals of impairment in the amount of  
EUR 2.8 million for the Timelkam CCGT power plant and in the amount of EUR 4.4 million  
for the Ebensee pumped-storage power plant project.  
INCREASED OWN ELECTRICITY GENERATION DESPITE LOW  
WATER LEVELS  
Total electricity procurement in the Energy Segment in the 2021/2022 fiscal year  
totalled 13,898 GWh and was 14.8% lower than in the previous year (16,315 GWh). While  
proprietary electricity procurement of 3,379 GWh was 13.6% higher than in the previous  
year (2,975 GWh), generation on the electricity markets was lower at 10,519 GWh (previous  
year: 13,340 GWh). This was mainly due to lower volumes for the management of the Group  
portfolios compared with the previous year.  
Electricity production from thermal capacities in the Energy Segment amounted to  
1,015 GWh and thus nearly doubled compared to the previous year’s value of 465 GWh.  
Compared to the previous year, this development is attributable to increased utilisation of the  
CCGT power plant Timelkam and to Cogeneration-Kraftwerke Management  
Oberösterreich GmbH (CMOÖ GmbH) in Laakirchen. The Timelkam CCGT power plant was in  
standby operation and in use for grid reserve and congestion management in the first quarter  
of the 2021/2022 fiscal year. However, the market situation from December onwards showed  
full marketability for CCGT power plants, leading to the standby for grid reserve being  
discontinued in January 2022 and to a resumption of electricity production for the free  
market; however, this use was reduced again at the start of the Russian-Ukrainian war for risk  
mitigation reasons.  
As the water level was significantly (6.0%) lower compared with the previous year,  
proprietary electricity procurement from hydroelectric power during the  
2021/2022 fiscal year totalled 2,232 GWh, which is 6.3% below the previous year’s figure of  
2,381 GWh. Compared with the long-term average, river water levels were 12.1% below  
average in the reporting period. The hydro coefficient of the Group’s own power plants and  
procurement rights was 0.88 during the reporting period (previous year: 0.94).  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
127  
Group Management Report Energy Segment  
Electricity procurement structure without electricity trading  
2021/2022; previous year’s figures in brackets  
With a view to the expansion of electricity generated from renewable energies, work pushed  
forward on the preliminary projects for the construction of the new Weissenbach power  
plant, and the replacement of the Traunfall power plant, in order to establish projects capable  
of approval.  
As a result of the strategy project with eww ag launched in 2020, Energie AG took over the  
operational management of the new Traunleiten hydropower plant and of several smaller  
power plants as of 1 January 2022. Therefore, Energie AG now manages the entire Traun  
power plant chain; this allowed for further optimisation in the interaction of the generation  
plants, leading to a significant increase in efficiency in the production of green electricity.  
Due to the changing conditions in the energy market, especially the expansion of electricity  
generation from volatile forms of energy such as wind and solar, there is an increasing need  
for additional, high-performance flexibility and storage capacities. This is why work on  
detailed planning, and request for quotation planning, for the Ebensee pumped-storage  
power plant began in the 2021/2022 fiscal year. The intent is to bring about a construction  
decision in the 2022/2023 fiscal year. The legally binding EIA approval notice for the project  
was secured as early as in the 2016/2017 fiscal year.  
Ennskraftwerke AG, in which Energie AG holds a participating interest of 50%, also reported  
electricity production below the long-term average in the 2021/2022 fiscal year, with a hydro  
coefficient of 0.85 (previous year: 0.88). Energie AG holds electricity procurement rights to  
the hydropower plants of Ennskraftwerke AG and Verbund Hydro Power GmbH with a total  
annual standard production capacity amounting to 1,410 GWh.  
Energie AG’s wind power portfolio in Austria continues to comprise investments in four  
wind parks with a pro rata overall performance of nearly 14.7 MW. Generation from wind  
power in the reporting period was 38 GWh (previous year: 35 GWh). The Munderfing wind  
farm is currently being expanded to include a further wind turbine with an output of  
3.45 MW. Trial operations and commissioning are scheduled for the fiscal year 2022/2023.  
Energie AG operates photovoltaic plants and PV contracting plants in Austria and Italy  
with a total capacity of 18 MWp (previous year: 14 MWp) via subsidiaries. In the  
fiscal year 2021/2022, PV systems generated 18 GWh of electricity (previous year: 13 GWh).  
A 3.3 MWp expansion of the SolarCampus in Eberstalzell went operational in the reporting  
period.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
128  
Group Management Report Energy Segment  
The distribution of district heating from the power plant locations in Riedersbach and  
Timelkam was 242 GWh, a drop of 5.5% compared with the previous year (257 GWh). Due  
to above-average temperatures in the winter of 2021/2022, demand for space heating fell.  
In Laakirchen, CMOÖ GmbH supplies a key account customer with electricity and process  
heat through a CCGT power plant, as well as several adjacent companies with district  
heating. The volume of process heat and district heating distributed to customers during the  
2021/2022 fiscal year amounted to 685 GWh and was therefore 4.9% below the previous  
year’s value (720 GWh).  
DYNAMIC ENVIRONMENT AND ON-GOING DEVELOPMENT OF  
THE SALES ORGANISATION  
The 2021/2022 fiscal year was characterised by unprecedented dynamics on the European  
electricity and gas markets. Vertrieb GmbH responded to this challenging development with  
appropriate strategic and operational measures. In the course of the tightening of the energy  
markets, intensive monitoring of the Russian-Ukrainian war and its impact on the supply  
situation in Austria in particular has been material to energy procurement and sales.  
In the competitive environment, there were price increases and customer contract  
terminations by other market entities; this, in turn, generated strong demand for new  
customer contracts in Energie AG’s Sales unit. Vertrieb GmbH responded to this development  
by introducing several price adjustments for new customers while ensuring that existing  
customers in the household and commercial sector benefitted from the price guarantee for  
standard electricity and gas products (with the exception of domestic/commercial float prices)  
and fibre-optic internet. Due to the significant increase in prices and the high volatility on the  
electricity and gas market, a product was developed to help business customers manage  
procurement timing risks; the risk mechanisms in the contracts were therefore adapted.  
The General Terms and Conditions (GTC) for electricity and gas used in the consumer sector  
were revised in the reporting period; this was prompted, in part, by a recent decision by  
Austria’s Supreme Court (OHG) on price adjustment clauses.  
The number of heating degree days in Upper Austria in the reporting period decreased by  
3.5% compared with the previous year, and was 3.1% above the average for the past five  
years. This meant that there was a year-on-year decline in sales volumes in the temperature-  
dependent Vertrieb GmbH business units. However, due to massive price increases and high  
volatility, even small volume deviations are economically significant in the current market  
situation.  
Since the beginning of the COVID-19 pandemic, receivables risk monitoring has been an  
unusually significant factor in sales activities, becoming even more important due to the  
current energy industry environment with greatly increased market prices. Standardised  
ratings ensured stability in ongoing monitoring operations and targeted risk management; as  
a result, no significant effects emanated from this item in the fiscal year 2021/2022.  
Constant forward-looking development of the organisation, especially in dynamic times,  
appears material: The retirement of ENAMO as an entity and brand following the renaming  
of “ENAMO Ökostrom GmbH” to “Energie AG Oberösterreich Öko GmbH” completed the  
last of a number of milestones for achieving the target structure in the Sales unit.  
Following in-depth strategic pre-analysis, the decision was also taken to discontinue electricity  
and gas sales activities in Germany and to implement this decision as of 31 December 2021.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
129  
Group Management Report Energy Segment  
Electricity  
Electricity sales volume  
in GWh  
At 6,621 GWh, Energie AG’s consolidated electricity sales  
volume in fiscal year 2021/2022 was 369 GWh below the  
previous year’s figure of 6,990 GWh.  
Sales volumes to business and industrial customers were  
down on the previous year, especially at Energie AG  
Oberösterreich Businesskunden GmbH (Businesskunden  
GmbH), where the volume fell due to customer switching  
and the discontinuation of business in Germany. The volumes  
in the residential, commercial and municipal customer sector  
were also below the previous year’s value due to the weather  
conditions.  
Gas sales volume  
Gas  
in GWh  
At 5,461 GWh, the volume of gas sold by Energie AG in the  
2021/2022 fiscal year was 946 GWh or 14.8% below the  
previous year’s figure of 6,407 GWh.  
There were massive price fluctuations in the business and  
industrial customer areas. As a result, besides isolated  
customer losses, there was also a drop in base load deliveries  
and in the purchasing behaviour of existing customers. The  
volume sold to residential, commercial and municipal  
customers was slightly lower than in the previous year due to  
the weather conditions.  
Heat  
Heat sales volume Austria  
in GWh  
The heat sales volume in Austria amounted to 1,178 GWh in  
the 2021/2022 fiscal year; this was down 5.0% on the  
previous year’s figure of 1,240 GWh.  
In addition to the district heating sales volume and the heat  
sales volume supplied to customers by CMOÖ GmbH, the  
heat sales volume also includes the volumes from energy  
contracting.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
130  
Group Management Report Energy Segment  
Telecommunications  
By the end of the 2021/2022 fiscal year, 16,723 customers were already actively using  
Energie AG’s products (previous year: 13,166). Despite the challenging competitive  
environment, Energie AG was also able to convince more customers in the business customer  
sector of its product benefits.  
Photovoltaics  
In the 2021/2022 fiscal year, 61 photovoltaic contracting customer plants (previous year: 50)  
with an output of 9.9 MWp (previous year: 8.4 MWp) were in operation. In addition to this,  
standardised products such as the “PV Super Deal” for households or the “PV Professional  
Deal” for commercial customers were developed, and already saw very high demand, during  
the reporting period.  
Electromobility  
The focus of electromobility activities is currently on charging solutions and the targeted  
establishment of public charging stations. Energie AG currently operates 164 publicly  
accessible charging stations (previous year: 128) and manages a total of over 604 charging  
points (previous year: 425).  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
131  
Group Management Report Grid Segment  
GRID SEGMENT  
Grid Segment overview  
Unit  
2021/2022  
2020/2021  
Change  
Total sales  
EUR mill.  
392.0  
380.9  
2.9%  
EBIT  
EUR mill.  
45.3  
37.2  
21.8%  
Investments in property, plant and equipment and intangible  
assets  
EUR mill.  
115.4  
103.6  
11.4%  
Workforce (on average)  
FTE  
582  
535  
8.8%  
Electricity grid distribution volume to end customers  
GWh  
8,118  
8,231  
-1.4%  
Gas grid distribution volume to end customers  
GWh  
19,592  
19,379  
1.1%  
STATUTORY AND REGULATORY FRAMEWORK IN THE GRID  
SEGMENT  
In addition to the operational challenges of implementing the Renewable Energy Expansion  
Act (EAG) package, grid operators are also feeling the effects of the current geopolitical  
situation and decarbonisation hype. This is reflected, for example, in the Electricity Segment  
by a further increase in demand for PV systems – on top of the aspects attributable to the  
incentives from the EAG package.  
The statutory environment was stable in the 2021/2022 fiscal year due to the fact that  
regulatory periods were still in effect until the end of 2022 for gas and until the end of 2023  
for electricity. Discussions are underway between E-Control Austria and industry  
representatives on formulating regulations for the subsequent periods starting in 2023 and  
2024. In the Gas Segment, the regulatory authority carried out a comprehensive cost review  
in the reporting period; the review forms the basis for the distribution grid operator  
benchmarks and cost path. Encouragingly, the gas division of Netz OÖ GmbH was confirmed  
as an efficient benchmark leader in the preliminary investigation report. This cost review is  
scheduled for fiscal year 2022/2023 for the electricity unit.  
The grid utilisation fees in the electricity sector increased by between 3.0% and 7.9% as at  
1 January 2022. This increase is attributable to high grid loss costs in the wake of rising  
energy market prices and higher upstream grid costs.  
The grid utilisation fees in the gas sector for consumers at grid level 3 rose by 5.5% as of  
1 January 2022. There was a substantial increase by 21.6% for end consumers at grid level 2.  
The reason for the increase was the roll-up of the regulatory parameters for the third  
regulatory period due to complaints filed by the Austrian Chamber of Commerce and the  
Federal Chamber of Labour. The procedure for 2020, which was still open, was decided on in  
the reporting period in line with previous procedures and is expected to be rolled up in future  
tariffs.  
BUSINESS DEVELOPMENT IN THE GRID SEGMENT  
The Grid Segment generated sales revenues of EUR 392.0 million in the reporting period. This  
represents a moderate increase of 2.9% compared with the previous year’s sales revenues. In  
fiscal year 2021/2022, the EBIT of the Grid Segment amounted to EUR 45.3 million and was  
therefore EUR 8.1 million up on the previous year’s operating result of EUR 37.2 million.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
132  
Group Management Report Grid Segment  
The Grid Segment EBIT now also includes the activities of the Metering Services operational  
unit, which was transferred from Telekom GmbH to Netz OÖ GmbH as part of an  
organisational change with effect as of 1 October 2021.  
In terms of operational activities, the regulatory tariff increase in the electricity and gas sectors  
had a positive impact on EBIT, while higher upstream grid costs and grid losses reduced  
earnings.  
ELECTRICITY AND GAS GRID AS THE BACKBONE OF THE UPPER  
AUSTRIAN SUPPLY INFRASTRUCTURE  
Netz OÖ GmbH, as the electricity and gas grid operator of Energie AG, solidified its leading  
position within the industry by gaining a new certification in fiscal year 2021/2022. Following  
intensive preparations and an audit phase lasting almost a full month, the company’s  
information security management systems (ISMS) could be successfully certified to ISO/IEC  
27001:2013. Parallel to the requirements of ISO/IEC 27001:2013, all requirements of the  
Network and Information System Security Act (NISG) were co-audited by a qualified body  
(QuaSte), with the NISG audit report expected early in the 2022/2023 fiscal year.  
Compared to the same period of the previous year, the electricity  
Electricity grid distribution volume to end  
grid distribution volume fell by a total of 1.4% from 8,231 GWh  
customers  
to 8,118 GWh in the fiscal year 2021/2022. This decrease in volumes  
in GWh  
is mainly attributable to the commercial and residential customer  
sector, which fell in the second half of the fiscal year in particular.  
Volumes in the industrial customer segment also decreased slightly in  
the reporting period. As of 30 September 2022, the electricity sector  
of the Grid Segment supplied approx. 522,000 active customer  
installations (previous year: 517,000).  
A sequence of several hurricane lows in February 2022 posed a  
challenge for grid operations. It was not only the individual events  
themselves, but the number of consecutive events in this period of  
time that placed a strain on the response teams. In this situation, the  
110 kV high-voltage grid once again proved to be the strong and  
reliable backbone of the Upper Austrian electricity supply.  
In the 2021/2022 fiscal year, grid activities focused on both grid  
upgrade and expansion measures to maintain and secure a stable  
electricity supply, and on the consistent implementation of the  
“Electricity Grid Master Plan Upper Austria 2028” (Stromnetz-  
Masterplan Oberösterreich 2028). This meant that the “Power Supply Pramtal South”  
projects, and the substations Hörsching, Ohlsdorf and Kronstorf West were completed or  
commenced operations. Work on the environmental impact statement began, following the  
decision to introduce a mandatory EIA for the “Electricity Supply Mühlviertel” project.  
Replacing of overhead power line sections of the medium and low-voltage grid with  
underground cable was continued wherever expedient. Just less than 10 kilometres of  
medium-voltage overhead power line were replaced by underground cables in the reporting  
period.  
The very large number of grid connection applications for decentralised electricity generation  
systems or, more specifically, for photovoltaic systems since the beginning of calendar year  
2022 was highly challenging. The number of applications is a multiple of the previous year’s  
figure. It proved impossible to provide 100% of the required grid capacity – it will be  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
133  
Group Management Report Grid Segment  
necessary to create this capacity through additional low- and medium-voltage grid  
construction work. The installed capacity from photovoltaics is around 589 MW (previous  
year: 396 MW) with around 39,300 connected systems (previous year: 30,100 systems).  
The gas volume transported for end customers in the Group’s own  
Gas grid distribution volume to end  
grid increased by 1.1% to 19,592 GWh year-on-year in the  
customers  
2021/2022 fiscal year (previous year 19,379 GWh). This development  
in GWh  
was largely the result of higher volumes delivered to industry and  
power plants, while volumes in the household and commercial  
sectors declined.  
The number of customers declined in the past fiscal year. The causes  
are assumed to be trends in society, political requirements, especially  
relating to environmental protection, and uncertainties relating to  
sufficient availability of gas.  
To ensure reliable operation of the gas grid, extensive upgrades were  
carried out at the RS 149 Bad Ischl throttling station on top of  
scheduled grid expansion. Three high-pressure gas pipelines with a  
total length of 36.9 km were investigated using smart pigging.  
Various repairs to high-pressure pipelines were carried out in the  
reporting period.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
134  
Group Management Report Waste Management Segment  
WASTE MANAGEMENT SEGMENT  
Waste Management Segment overview  
Unit  
2021/2022  
2020/2021  
Change  
Total sales  
EUR mill.  
272.6  
256.2  
6.4%  
EBIT  
EUR mill.  
33.9  
29.6  
14.5%  
Investments in property, plant and equipment and intangible  
assets  
EUR mill.  
19.7  
28.9  
-31.8%  
Workforce (on average)  
FTE  
831  
821  
1.2%  
Total waste volume handled 1)  
1,000 t  
1,575  
1,701  
-7.4%  
Incinerated waste volume  
1,000 t  
591  
586  
1.0%  
1) Previous year's value restated  
ECONOMIC ENVIRONMENT FOR THE WASTE MANAGEMENT  
SECTOR  
In the 2021/2022 fiscal year, the Waste Management Segment continued to benefit from  
what was, for the most part, a very good economic environment.  
Both nationally and internationally, the Circular Economy Package, formulated at EU level,  
continues to be the focus of attention. The Circular Economy Package amendment under the  
Waste Management Act (AWG) is intended to ensure waste avoidance, recycling, reuse, and  
product design geared towards sustainability. Targets in line with this for recycling, quotas for  
reusable and disposable packaging, requirements for the reduction of certain plastic products  
and on the issue of producer responsibility, incineration bans and landfill restrictions have  
been formulated and pose major challenges for the stakeholders.  
One of the focuses here is plastic packaging: in order to achieve the EU target of a 50%  
recycling rate in 2025, recycling must be doubled in the coming years. In addition, a new  
independent quota for separate collection of PET beverage bottles becomes mandatory as of  
2025. In order to be able to achieve these high targets, the Circular Economy Package, an  
amendment to the Waste Management Act, envisages the mandatory, staggered  
introduction of reusable packaging quotas in the food industry as well as a commitment on  
the part of the beverage industry to charge a deposit on PET and aluminium containers as of  
1 January 2025.  
Further provisions from the Waste Management Act (AWG) mandates that, starting on  
1 January 2023, waste transportation of volumes above 10 t over distances of more than 300  
kilometres must be effected by rail or similarly climate-friendly means of transport, with the  
kilometre threshold due to drop to 100 kilometres by 1 January 2026. Although the  
amendment offers opportunities, such as relieving the fraught situation in logistics services  
provoked by a lack of heavy goods vehicle drivers, however, it also entails economic risks.  
From 1 January 2023 onward, the amendment to the Packaging Regulation (VVO) requires  
commercial packaging placed on the market exclusively to be returned via a collection and  
recovery system. As a waste management company, Energie AG Oberösterreich Umwelt  
Service GmbH (Umwelt Service GmbH) would in future essentially be limited to only logistics  
services for a part of the paper and cardboard volumes. The concrete application, feasibility  
and potential financial impact are still uncertain due to numerous open issues relating to  
feasibility in practice.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
135  
Group Management Report Waste Management Segment  
The positive trend from the previous year continued for the recyclable materials paper/  
cardboard and scrap metals. The Wiesbaden index for paper and cardboard packaging was  
even higher on average in the 2021/2022 fiscal year than in the previous year, meaning that  
higher sales revenues were achieved in the reporting period. However, a significant fall in  
prices was visible at the end of fiscal year 2021/2022. In the scrap metal sector, the average  
price for steel scrap was also significantly higher than one year earlier, peaking around the  
middle of the 2021/2022 fiscal year. At the end of the 2021/2022 fiscal year, although the  
price was lower than the starting price at the beginning of the fiscal year, however, it was still  
at a relatively high level.  
BUSINESS DEVELOPMENT IN THE WASTE MANAGEMENT  
SEGMENT  
In the 2021/2022 fiscal year, sales revenues in the Waste Management Segment amounted  
to EUR 272.6 million (previous year: EUR 256.2 million), representing an increase of 6.4%.  
The operating result rose by EUR 4.3 million to EUR 33.9 million compared with the previous  
year’s figure (EUR 29.6 million).  
The price development for the recyclable materials paper/cardboard and scrap metals once  
again contributed to the increase in sales revenues and EBIT, despite significant price declines  
for paper/cardboard becoming noticeable at the end of fiscal year 2021/2022. Similarly,  
electricity and heat revenues for the volumes decoupled from Welser Abfallverwertung (WAV)  
increased significantly in the first half of the year compared to the previous year. Growth in  
sales revenues and earnings was also noted for municipal, commercial and industrial waste.  
The previous year’s EBIT included reversals of impairment for waste incineration plants  
totalling EUR 4.7 million.  
STABLE DEVELOPMENT IN WASTE MANAGEMENT SERVICES  
A throughput of some 591,400 t of incinerated waste volume was  
Incinerated waste volume  
achieved at the waste incineration plant in Wels and Lenzing.  
in 1,000 t  
This is equivalent to an increase of 1.0% compared with the previous  
year.  
The annual inspection at the Lenzing waste incineration plant took  
place in spring. At WAV, the overhaul of line 2 was completed in  
May, with line 1 being completed in August 2022.  
In the reporting period, the waste incineration plant in Wels  
distributed 243 GWh of heat (previous year: 234 GWh) to the  
district heating network and to one other key account customer.  
Electricity procurement totalled 198 GWh (previous year: 194 GWh).  
In the course of the comprehensive strategy project with eww ag,  
the heat supply to both households and businesses in the Wels area  
has been significantly expanded and condensed since 2021. In  
addition, a second large transport pipeline was built in the north of  
the city in 2021 and 2022, while two state-of-the-art hot water  
generators were built to secure the district heating supply. This will  
substantially increase heat extraction at the Wels waste incineration plant. Umwelt  
Service GmbH took over the exclusive heat supply to eww ag as of 1 May 2022. The  
extensive preparatory work required for this was successfully completed.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
136  
Group Management Report Waste Management Segment  
The treatment plants for hazardous waste in Steyr were again very well utilised in the  
2021/2022 fiscal year. In terms of maintenance, the focus was primarily on the renovation of  
the CPO plant (chemical/physical treatment plant for organic waste). In addition, the fire  
alarm and extinguishing systems were upgraded.  
Compared with the fiscal year 2020/2021, the total volume  
Total waste volume handled  
handled in the Waste Management Segment dropped by approx.  
in 1,000 t  
7.4% to a total of some 1,575,000 t (previous year: 1,701,000 t).  
While the volumes in Austria declined, especially for waste wood,  
paper/cardboard, and construction waste, the total volumes in South  
Tyrol remained at the previous year’s level.  
The extension work at the repair workshop in Attnang-Puchheim for  
company-owned heavy goods vehicles was completed in the  
reporting period. Beyond this, large-scale roofing work using PV  
modules was started at the Mühldorf site in order to, among other  
things, protect the waste material collection centre for several  
communities against external weather influences, while at the same  
time generating renewable energy. In addition, modernisations and  
expansion work has pushed forward at several sites, including fire  
protection work.  
The reconstruction work relating to the relocation of the company  
headquarters from Hörsching to the WAV site in Wels has been  
concluded. The relocation of the company headquarters and the  
accompanying relocation work were completed in the first half of the 2021/2022 fiscal year.  
The investigations throughout Austria into the area of collection and transport in the waste  
management industry initiated by the Federal Competition Authority (BWB) are still in  
progress. Umwelt Service GmbH is actively involved in the investigation and has assured the  
BWB of its full willingness to cooperate.  
The Neumarkt site in South Tyrol achieved higher earnings compared with the previous year.  
There were positive developments in commercial and industrial waste. Operations in the  
production of refuse derived fuels (RDF) and glass sorting were also positive. Compared to  
this, the scenario in paper and board volumes was challenging with paper mills increasingly  
competing directly with waste management companies to acquire paper volumes.  
In the WDL-Wasserdienstleistungs GmbH (WDL GmbH), the general conditions for  
drinking water supply and waste water disposal in Austria were largely stable during the  
reporting period. An important contract with an industrial customer in the service sector was  
successfully extended. At WDL GmbH, the main focus was on maintaining the secure supply  
of drinking water and further developing the services offered.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
137  
Group Management Report Czech Republic Segment  
CZECH REPUBLIC SEGMENT  
Czech Republic Segment overview  
Unit  
2021/2022  
2020/2021  
Change  
Total sales  
EUR mill.  
194.7  
173.2  
12.4%  
EBIT  
EUR mill.  
6.0  
11.1  
-45.9%  
Investments in property, plant and equipment and intangible  
assets  
EUR mill.  
8.0  
9.1  
-12.1%  
Workforce (on average)  
FTE  
1,715  
1,718  
-0.2%  
Invoiced drinking water volume  
m3 mill.  
49.2  
48.2  
2.1%  
Invoiced waste water volume  
m3 mill.  
45.2  
45.1  
0.2%  
GENERAL CONDITIONS IN THE CZECH REPUBLIC  
The COVID-19 situation in the Czech Republic increasingly eased during the  
2021/2022 fiscal year. Following this, the Czech government rescinded most of the measures  
to prevent the further spread of the COVID-19 pandemic.  
Although this had a positive effect on the economic development of the country, the  
generally difficult conditions on the energy market and the Russia-Ukraine war on top had a  
negative impact on the economy. Inflation in the Czech Republic rose sharply during the  
reporting period, reaching a peak of 18% in September 2022. The unemployment rate  
settled near full employment during the 2022 calendar year.  
In the Water unit, a new price regulation between the operator and the infrastructure owner  
– in particular relating to the maximum permissible costing margin on drinking water, and  
wastewater charges – was agreed as on 1 January 2022. One significant innovation here is  
determining a permissible margin based on the replacement values of the non-current assets  
in operation. This will create sufficient funds for the owners to replace infrastructure.  
At the same time, the Czech regulatory authority for the heating sector enacted a change in  
heat pricing on 1 January 2022. Based on this, the maximum profit is now calculated, among  
other things, by the inflation-adjusted acquisition value of the assets in operation. From  
today’s perspective, these regulatory adaptations will not have any negative impact on the  
Czech Republic Segment.  
In the reporting period, the energy crisis with sharply rising market prices exposed trading  
companies for electricity and gas in particular to massive pressure, ultimately triggering  
insolvencies and the departure of numerous market participants; this also affected the Czech  
Republic Segment. This has led to further massive price increases for energy customers who  
now have to procure replacements at high prices on the spot market – in part for volumes  
that had already been secured. On top of this, energy suppliers are refusing to conclude new  
contracts in many cases. As a consequence the commodities to be procured are being  
distributed across several suppliers in order to minimise the risk of default.  
High gas prices were particularly relevant for the heating business of Energie AG’s Czech  
Republic Segment, as a large proportion of heat is generated by gas-fired boilers and  
combined heat and power plants. In the case of water supply and waste water management,  
higher market prices impacted on electricity expenses for water and waste water treatment  
and allocation. However, the remedial actions taken, including passing on the increased  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
138  
Group Management Report Czech Republic Segment  
energy costs to the customers or damage agreements with the previous supplier, have  
substantially mitigated the impact.  
The Czech koruna steadily strengthened against the euro in the course of the  
2021/2022 fiscal year. The exchange rate was around EUR/CZK 24.6 towards the end of the  
reporting period.  
BUSINESS DEVELOPMENT IN THE CZECH REPUBLIC SEGMENT  
In the 2021/2022 fiscal year, the Czech Republic Segment generated sales revenues of  
EUR 194.7 million in its water and heating business. This was equivalent to an increase of  
12.4% compared with the previous year and was attributable to exchange rate effects, price  
and volume increases and the services sector. In addition, the sales revenues of the Czech  
Republic Segment now also include the activities of RATE s.r.o., which was acquired by  
Energie AG Bohemia s.r.o. as of 3 January 2022.  
The EBIT in the Czech Republic Segment amounted to EUR 6.0 million in the reporting period.  
This is equivalent to a decrease of 45.9% (previous year: EUR 11.1 million), which is mainly  
due to the significant rise in energy overheads, triggered by replacement purchases of  
electricity and gas, as well as the massive price increases due to the Russian-Ukrainian war.  
STABLE VOLUME DEVELOPMENT IN THE CZECH REPUBLIC  
In the Czech Republic Segment, a total of 49.2 million m3 of drinking water (previous year:  
48.2 million m3) and 45.2 million m3 of waste water (previous year: 45.1 million m3) were  
invoiced in the reporting period. In total, this corresponds to slightly higher volumes in  
drinking water and waste water business, although developments varied from region to  
region.  
Invoiced drinking water volume  
Invoiced waste water volume  
in m3 mill.  
in m3 mill.  
All major tenders for drinking water and wastewater were won, the most important being  
those in Přeštice, Žirovnice, Dobřany (ČEVAK a.s. in all cases) and those of the association of  
local authorities JEKOZ (Energie AG Kolín a.s.).  
The heat sales volume in the Czech Republic amounted to 198 GWh in the reporting  
period, which is 5.0% above the previous year’s figure (189 GWh) due to the acquisition of a  
heat supplier in Štětí and despite the mild winter.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
139  
Group Management Report Czech Republic Segment  
In organisational terms, the focus in the reporting period was on company mergers in the  
western part of the supply area and in the central Prague region. In the process, the  
companies Energie AG Teplo Rokycany s.r.o. and Tepelné zásobování Rakovník, spol. s.r.o.  
were merged and now operate as Energie AG Teplo Bohemia s.r.o. In the second half of the  
reporting period, the focus was also on preparing the strategic merger of the water and  
wastewater activities in the central region around Prague. The first step was the takeover of  
VAK Zápy s.r.o. by its affiliate company VAK Beroun a.s.  
Additionally, 100% of the shares in RATE s.r.o. were acquired by Energie AG Bohemia s.r.o.  
on 3 January 2022. The company, which has a workforce of 23, is located 80 km north of  
Prague and uses industrial waste heat from the paper industry to supply heat and hot water  
to approximately 10,000 inhabitants of the town of Štětí and surrounding communities.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
140  
Group Management Report Holding & Services Segment  
HOLDING & SERVICES SEGMENT  
Holding & Services Segment overview  
Unit  
2021/2022  
2020/2021  
Change  
Total sales  
EUR mill.  
258.1  
274.7  
-6.0%  
EBIT  
EUR mill.  
46.6  
28.1  
65.8%  
Investments in property, plant and equipment and intangible  
assets  
EUR mill.  
33.6  
48.3  
-30.4%  
Workforce (on average)  
FTE  
1,019  
1,055  
-3.4%  
Length of fibre-optic network  
km  
5,820  
7,021  
-17.1%  
BUSINESS DEVELOPMENT IN THE HOLDING & SERVICES  
SEGMENT  
Sales revenues in the Holding & Services Segment in the reporting period were  
EUR 258.1 million; this is equivalent to a decrease of 6.0% compared with the previous year  
(EUR 274.7 million). The reduction in sales revenues and EBIT in the Holding & Services  
Segment was prompted by the transfer of the Metering Services operational unit, which was  
transferred from Telekom GmbH to Netz OÖ GmbH as part of an organisational change with  
effect as of 1 October 2021.  
The EBIT of the Holding & Services Segment increased from EUR 28.1 million in the previous  
year to EUR 46.6 million in the fiscal year 2021/2022. The positive development of the  
operating result in the reporting period primarily resulted from the measurement of the share  
in BBOÖ Breitband Oberösterreich GmbH in the amount of EUR 37.0 million. Beyond this, a  
reversal of impairment of EUR 3.5 million was recorded for Wels Strom GmbH, which is  
consolidated using the equity method, while the EBIT of the previous year included a reversal  
of impairment in the amount of EUR 15.4 million for Wels Strom GmbH. The Energie AG’s  
service companies allocated to the Holding & Services Segment declined slightly overall, while  
the Telecommunications business area’s remaining activities in the segment showed a slightly  
positive development in the reporting period.  
STRATEGIC FOCUS IN THE TELECOM SECTOR  
For Telekom GmbH, the 2021/2022 fiscal year was characterised by restructuring and process  
realignment.  
Following the completion of the mass smart meter rollout, the “Metering Services”  
operational unit was already merged with the affiliated Netz OÖ GmbH at the start of the  
reporting period.  
Wide-ranging structural adjustments were made (with retrospective effect on the balance  
sheet as of the beginning of the 2021/2022 fiscal year) in April 2022. Due to the bundling of  
broadband activities with the Province of Upper Austria to leverage synergy potential in the  
fibre-optic rollout, the FTTH unit of Telekom GmbH was spun off into BBOÖ GmbH. The  
Province of Upper Austria brought Fiber Service OÖ GmbH into the joint venture. For further  
details see the section Changes under corporate law › Page 117.  
At Telekom GmbH, the focus in the second half of the reporting period was primarily on  
strategic realignment due to the new situation, and on revising the processes and designing  
the newly created interfaces.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
141  
Group Management Report Holding & Services Segment  
In the future, Telekom GmbH will focus on expanding its position as a strong partner for  
future-orientated communication and control solutions. Specific development measures and  
innovative customer offerings were elaborated for the company’s two main pillars “Fibre  
Wholesale” and “Control Solutions”.  
In the Fibre Optics business area, Telekom GmbH offers carriers a  
Length of fibre-optic network  
specific range of services relating to data transport on the backbone  
in km  
network and layer 2 technology (signalling technology – data link  
layer). Besides this, Telekom GmbH acts as a wholesale partner for  
internet service providers (ISPs) and Group affiliate Vertrieb GmbH, to  
connect additional locations and business customers to its own fibre-  
optic network and therefore to further boost the capacity utilisation  
of the network and generated value.  
In the backbone and wholesale area, the length of the fibre-optic  
network remaining in the Group was 5,820 km (previous year’s  
figure: 7,021 km). The decrease compared with the previous year’s  
figure is attributable to the spin-off of the FTTH area to  
BBOÖ GmbH.  
Other activities in the telecommunications area in the reporting  
period included providing internal communications and control  
solutions within the Group, for example, data provisioning and  
connecting the Group’s own facilities (control system support).  
STRATEGIC INVESTMENTS  
The at-equity consolidated companies Wels Strom GmbH and Salzburg AG, as well as further  
minority holdings complete the business portfolio of Energie AG.  
Wels Strom GmbH, in which Energie AG holds a 49% participating interest, is the  
integrated electricity supply company of the city of Wels. Other business areas include  
services relating to electric mobility and energy systems for key account customers.  
In the last completed fiscal year (1 January 2021 to 31 December 2021), the electricity sales  
volume to customers increased to 742 GWh (2020: 692 GWh), 15% of which was covered  
by own production, mainly from hydroelectric power. Some 48% of the electricity distribution  
was generated outside the grid area of Wels Strom GmbH. The volume increases in the  
electricity grid are attributable in part to the fact that the COVID-19 lockdowns in 2020  
resulted in greater volume reductions than were experienced in 2021.  
In the scope of an extensive strategy project that started in 2020, the owners of Wels  
Strom GmbH – eww ag and Energie AG – realigned the supply of heat and energy to the  
Wels area in cooperation with the subsidiary. The aim was to leverage synergy potentials and  
improve service quality. The operational implementation steps of this comprehensive future  
initiative started in 2021 and will continue until the end of 2022.  
Salzburg AG für Energie, Verkehr und Telekommunikation (Salzburg AG), in which  
Energie AG holds a 26.13% participating interest, has consistently pursued the forward-  
looking growth strategy adopted in the summer of 2020 on the path to a greener future,  
despite the challenges posed by COVID-19. This meant that Salzburg AG was geared even  
more strongly for growth, innovation and customer orientation in terms of content and  
organisation, and its reorientation from an infrastructure company to a “green tech  
company” was pushed forward.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
142  
Group Management Report Holding & Services Segment  
Investments continued along the previous path, consistently pushing forward with the  
expansion of green energy with simple products and innovative solutions, in the photovoltaics  
and e-mobility sectors for example. There will also be substantial investment in broadband  
expansion, with more than EUR 100.0 million to be invested throughout the state of Salzburg  
by 2025. Beyond this, Salzburg AG is pursuing an innovation strategy that strengthens its  
core business with digital solutions and forward-looking ideas while focusing on new markets  
and business areas. Cooperation with start-ups is part of this strategy.  
Business performance in the most recently completed fiscal year (1 January 2021 to  
31 December 2021) was characterised by a decline in total procurement in the electricity  
sector. Although electricity distribution to end customers rose slightly to 3,387 GWh (previous  
year: 3,304 GWh), the trading volume of 10,708 GWh was significantly lower than in the  
previous year (12,801 GWh). Generation from hydroelectric power fell by 9.7% compared  
with the previous year to 1,390 GWh (previous year: 1,539 GWh) due to below-average  
water levels.  
Gas sales to end customers totalled 1,793 GWh; this was up on the previous year’s figure  
(1,606 GWh) due to growth in the key account segment. Electricity and gas grid distribution  
to end customers in the Salzburg Netz GmbH grid were both up on the previous year. At  
976 GWh, total district heating sales including grid losses was 8.5% higher than in the  
previous year. Electricity and gas sales to customers were at 3,304 GWh and 1,606 GWh,  
respectively, which is 3.5% and 3.4% below the level of the previous year.  
The telecommunications business unit has seen constant growth for years; this is also the  
case in Salzburg AG’s 2021 fiscal year. Customer numbers increased again in the areas of  
cable TV and internet. This year, internet trade magazine connect confirmed that Salzburg  
AG offered the best performing internet in the entire Province of Salzburg.  
Additions to non-current assets totalled EUR 185.7 million (previous year: EUR 129.0 million).  
This includes, among other things, investments of EUR 16.1 million in generation plants  
(previous year: EUR 9.0 million), investments of EUR 57.7 million in the electricity grid  
(previous year: EUR 45.0 million), investments of EUR 38.5 million in the telecommunications  
sector (previous year: EUR 33.3 million) and investments of EUR 19.3 million attributable to  
the introduction of smart meters (previous year: EUR 13.5 million).  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
143  
Group Management Report Holding & Services Segment  
SHARED SERVICES  
The four Group-wide service companies  
Energie AG Oberösterreich Business Services GmbH (Business Services GmbH),  
Energie AG Oberösterreich Customer Services GmbH (Customer Services GmbH),  
Energie AG Oberösterreich Personalmanagement GmbH (Personalmanagement GmbH)  
as well as  
Energie AG Oberösterreich Tech Services GmbH (Tech Services GmbH)  
are combined in the Holding & Services Segment.  
These service companies provide commercial and technical services for the entire Group in  
accordance with precisely defined quality and safety standards. These services are guided by  
external market conditions for similar products and services.  
Business Services GmbH bundles services for the Energie AG Group in the areas of  
purchasing and logistics, real estate management, information technology, accounting, and  
insurance and legal services. One focus of work in fiscal year 2021/2022 was the finalisation  
of the extension to Group headquarters in Linz in the form of an office building with an  
energy-efficient design. In the scope of the construction of a new office and workshop  
building in Gmunden, various official and award procedures were completed and civil  
engineering work began. Besides this, the focus was on the start of the design phase for the  
S/4HANA transformation of the enterprise resource planning (ERP) system landscape, the  
implementation of various projects to enhance IT security, and the successful completion of  
the project to harmonise commercial sales and customer care processes. The test phase of the  
“Digital Driver’s Logbook” project started.  
The Customer Services GmbH bundles the Group’s customer services and data protection  
back office, billing, provider switch management, receivables management and payment  
processing in customer-facing operations. In the 2021/2022 fiscal year, employees provided  
services for around 1.55 million customer contracts. In addition to the reliable provision of all  
services in the face of the continuing COVID-19 pandemic, the 2021/2022 fiscal year was  
characterised by many projects. In the reporting period, for example, the focus was on the  
topics “changes in consumption data transmission”, “energy cost compensation” and  
“implementation of energy communities in the scope of the Renewable Energy Expansion  
Act package”. Customer Services GmbH was also strongly involved in the successful  
migration and GoLive of the project to adapt the SAP system architecture in the area of billing  
and customer services.  
The focus of Personalmanagement GmbH’s activities is both on matters related to  
personnel strategy and personnel policy for the Group, governed by the Holding division “HR  
Strategy and Control”, and on all agendas relating to personnel and management  
development, personnel support, personnel accounting and apprenticeship programs. In  
addition to the challenges posed by COVID-19, the strategic focus in the  
2021/2022 fiscal year was on employer branding activities. In addition, the focus was on  
management development using innovative formats and supplementary measures for the  
rapid and uncomplicated advanced training of employees on subjects related to digitalisation.  
During the reporting period, the conclusion of a company agreement on remote work took  
another important step forward towards making working hours more flexible. In the context  
of work-life balance, the opening of a company childcare facility in July 2022 is particularly  
worthy of note.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
144  
Group Management Report Holding & Services Segment  
Tech Services GmbH is the central know-how provider in the Group’s technical services  
segment. These services include conceptual design, project planning, construction,  
maintenance and prompt troubleshooting of electricity, gas, and telecommunications  
infrastructures and power plants, especially in the field of hydroelectric power, heat and  
photovoltaics. These services were primarily provided for affiliated companies in the Group in  
the 2021/2022 fiscal year. To ensure capacity utilisation, numerous external customer orders  
were won, underlining competitiveness. In addition to the constant challenges posed by the  
COVID-19 pandemic, the Russian-Ukrainian war also resulted in increasing supply issues for  
key material resources. One major challenge in the reporting period was the increasing order  
volume, particularly in the area of electricity grid expansion, and the recruitment of essential  
personnel. Maintaining an effective task force for troubleshooting and retaining expertise in  
the planning, construction and maintenance of plants in the Group’s environment with high  
quality and at marketable prices remain our top priorities.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
145  
Group Management Report Outlook  
OUTLOOK  
With a view to economic development in the fiscal year 2022/2023, forecasts by economic  
research institutes are pessimistic across the board due to the sharp rise in prices and limited  
consumer purchasing power. In any case, the IHS, WIFO and IMF expect the economy to drop  
very sharply in 2023, forecasting GDP growth for Austria in the range of +0.2% to +1.0%  
with inflation between +5.1% and +6.8%. In the euro zone, economic growth of +0.3% to  
+2.3% is expected for 2023.  
Shortly after the end of the reporting period, the National Emission Allowance Trading  
Act (NEHG) 2022 implementing the eco-social tax reform came into force on 1 October  
2022 and the Market Premium Regulation on 4 October 2022. The changes in the tax  
system resulting from CO2 pricing and the new legal regulations announced for energy  
efficiency, heating and climate protection will define new general conditions for all sectors of  
the energy industry; this will naturally have an impact across all consumption segments –  
from households to industry – and will be a factor shaping further sales activities.  
On 18 November 2022, the Austrian federal government announced the key points related  
to the national implementation of the EU Emergency Measures Regulation on the absorption  
and redistribution of surplus proceeds. In future, a revenue cap of EUR 140.0/MWh will apply  
for electricity producers, which can increase in case direct additional costs are proven. There  
will also be an input credit for investments into renewable energies and energy efficiency.  
These regulations come into effect on 1 December 2022 in Austria and will apply until  
31 December 2023. An initiative for the new Energy Crisis Levy Act was already submitted  
to the National Council and a resolution is expected in December.  
The general conditions in the energy industry remain challenging for Energie AG, and for  
the entire industry. The future development of prices on the international energy markets is  
difficult to assess for the 2022/2023 fiscal year due to the many unpredictable factors  
influencing these. Key factors will include the further course of the Russian-Ukrainian war,  
political or regulatory intervention in the market, including possible energy-steering measures  
by the Austrian government, economic developments, and weather conditions, particularly in  
the coming winter.  
Against the backdrop of the rising and volatile energy prices and the related procurement  
risk, tightly meshed integration of procurement and sales processes will continue to play a  
central role in the coming months. The price guarantee in the residential and commercial  
customer segment will end at the beginning of the 2023 calendar year; prompted by higher  
procurement costs, a price increase will be necessary for the electricity and gas supply to  
existing customers. The support measures planned or adopted by government – such as the  
electricity price cap – are intended to ease the burden on customers.  
In the generation sector, work on the Ebensee pumped-storage power plant project will  
push forward intensively in order to bring about a building decision in the  
2022/2023 fiscal year. The construction of additional flexible storage capacities is a basic  
prerequisite for achieving the ambitious national expansion targets for electricity generation  
from renewable energies while at the same time ensuring security of supply.  
The focus for the Grid Segment in the fiscal year 2022/2023 will be on the in-depth  
regulatory review of costs and structures in the electricity grid sector and the establishment of  
the electricity distribution grid operator benchmark based on this. In terms of tariffs, higher  
electricity grid utilisation fees can be expected due to the fraught situation on the energy  
market, as high energy prices will also have an impact on the procurement prices for grid  
losses. In addition to this, the implementation of the EAEC package will play a central role.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
146  
Group Management Report Outlook  
Expansion of photovoltaic systems is expected to remain at a similarly high level in the coming  
years; the challenges will then shift to expanding the existing grid infrastructures. In addition,  
further relevant changes in the statutory environment are expected for the Grid Segment in  
the course of the 2022/2023 fiscal year, for example, due to the Electricity Market Act for the  
electricity sector, and due to the Renewable Heat Act for the gas sector.  
In the Waste Management Segment, the very good economic environment prevalent in  
the 2021/2022 fiscal year is unlikely to continue at the same level. A noticeable turnaround  
has already begun and the market situation is expected to be challenging in the  
2022/2023 fiscal year. In the paper/cardboard sector in particular, the paper industry is  
expected to purchase significantly lower volumes due to production cutbacks. The market for  
waste wood is currently tight due to high demand and limited availability. In addition, further  
cost increases can be expected due to high inflation.  
High energy costs will continue to be a major challenge in the Czech Republic Segment,  
particularly in the first quarter of the new fiscal year 2022/2023. The Czech government has  
decided to cap prices for electricity and gas as of 1 January 2023; this is expected to prompt a  
positive development in results from the heating and water sectors. Close monitoring of the  
current developments on the electricity and gas market, which are dramatic in terms of costs,  
is continuing, especially since these drastic price increases are exposing suppliers, operators  
and customers under serious pressure. One focus in the coming fiscal year will be on the  
ongoing development of energy efficiency projects for the heat and water supply and  
wastewater management. VAK Zápy s.r.o. was merged with its owning company VAK Beroun  
a.s. at the beginning of the 2022/2023 fiscal year; the company will in future manage the  
water and wastewater activities in the central region around Prague. The services provided to  
municipalities and cities are forecasted to remain stable in the 2022/2023 fiscal year, although  
– here too – there are signs of greater reticence in terms of communal investment.  
In the telecommunications business area, the focus in the next fiscal year will be on  
wholesale, i.e., the marketing of bandwidths to internet service providers. In this area, work is  
underway to optimise the product range and take a more active approach to customer  
support and acquisition. In addition, the interfaces and processes with the recently created  
BBOÖ GmbH are being continuously improved in order to push forward with the fibre-optic  
roll-out for Upper Austria in the best possible way. In the area of intra-Group services – in  
particular operational technology – the aim is to continue to develop existing services with a  
view to the needs of users, and create attractive offerings for the Group’s partners by doing  
so.  
In its function as an energy supplier majority-owned by the Province of Upper Austria,  
Energie AG will continue to make every effort in the 2022/2023 fiscal year to reliably  
perform its system-critical tasks, in particular supplying its customers, in a fragile economic  
and geopolitical situation. The permanent orientation of all services to customer needs, the  
focuses of digitalisation and innovation, and the financial stability of the Group will remain  
important strategic objectives in the future.  
At the same time, the focus is more than ever on making a significant contribution to the  
energy transition by expanding renewable energies, establishing a comprehensive circular  
economy system and pushing forward with the transformation in mobility. The stable  
financial situation achieved in recent years through forward-looking measures and the  
Group’s diversified business portfolio provide the basis for mastering these challenging  
developments.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
147  
Group Management Report Outlook  
Against the backdrop of the significant number of uncertainties and highly volatile price  
developments, EBIT for the 2022/2023 fiscal year is expected to come in at least at the level  
of the 2021/2022 fiscal year – subject to further potential interventions in the market by  
policymakers or regulators.  
Linz, 5 December 2022  
The Management Board of Energie AG Oberösterreich  
Chief Executive Officer  
DDr. Werner Steinecker MBA  
Dr. Andreas Kolar  
Dipl.-Ing. Stefan Stallinger MBA  
Chairman of the Management Board  
Member of the Management Board  
Member of the Management Board  
CEO  
CFO  
COO  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
148  
Consolidated Financial Statements  
Consolidated Financial Statements 2021/2022  
of Energie AG Oberösterreich  
CONSOLIDATED STATEMENT OF INCOME  
1 OCTOBER 2021 TO 30 SEPTEMBER 2022  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
1. Sales revenues  
(6)  
4,002,090.3
2,145,163.5
Procurement costs for proprietary electricity trading  
(6)  
-193,860.1
-118,964.6
Net sales revenues  
(6)  
3,808,230.2
2,026,198.9
2. Change in inventories of finished goods and work in progress  
2,585.0
1,388.4
3. Other capitalised corporate services  
41,737.4
44,049.3
4. Share in result of companies consolidated at equity  
(3.1.; 17)  
23,729.8
29,182.2
5. Other operating income  
Reversals of impairment  
(16.2.)  
4,107.2
11,880.6
Other  
(8)  
60,874.2
21,229.6
64,981.4
33,110.2
6. Expenses for material and other purchased services  
(9)  
-3,114,162.3
-1,292,784.5
7. Personnel expenses  
(10)  
-318,354.6
-308,420.6
8. Depreciation, amortisation and impairments (thereof impairments  
EUR -993.9 thousand (previous year: EUR -723.0 thousand))
(11; 16)  
-165,597.4
-164,425.8
9. Other operating expenses  
(12)  
-192,512.8
-179,894.7
10. Operating result  
150,636.7
188,403.4
11. Financing expenses  
(13)  
-27,942.1
-24,166.0
12. Other interest income  
(13)  
1,231.2
1,077.3
13. Other financial result  
(14)  
-2,016.1
2,954.5
14. Financial result  
-28,727.0
-20,134.2
15. Earnings before taxes  
121,909.7
168,269.2
16. Income taxes  
(15)  
-10,688.7
-36,410.3
17. Consolidated net earnings  
111,221.0
131,858.9
Thereof attributable to non-controlling interests  
1,061.6
1,111.8
Thereof attributable to investors in the parent company  
Consolidated net profit  
110,159.4
130,747.1
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
149  
Consolidated Financial Statements Consolidated Statement of Comprehensive Income  
CONSOLIDATED STATEMENT OF  
COMPREHENSIVE INCOME  
1 OCTOBER 2021 TO 30 SEPTEMBER 2022  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
1. Consolidated net earnings  
111,221.0
131,858.9
2. Other comprehensive income  
Items that will not be subsequently reclassified to the  
statement of income:  
Remeasurement of the defined benefit obligation  
(25)  
43,740.6
-3,593.3
Changes in value of at-equity companies recognised in equity  
43.3
-7.8
Changes in value of investments and securities FVOCI  
(23)  
5,911.4
5,529.5
Deferred taxes  
(15)  
-13,122.5
-529.9
Items that may be subsequently reclassified to the statement  
of income:  
Hedge accounting  
(23; 24)  
223,203.8
142,754.3
Changes in value of at-equity companies recognised in equity  
763.4
119.5
Translation differences  
(5.19.)  
3,802.8
6,321.9
Deferred taxes  
(15)  
-49,372.5
-35,688.6
Total expenses and revenues recognised in other  
comprehensive income  
214,970.3
114,905.6
3. Total comprehensive income after taxes  
326,191.3
246,764.5
4. Thereof attributable to non-controlling interests  
1,321.4
2,035.4
5. Thereof attributable to parent company  
324,869.9
244,729.1
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
150  
Consolidated Financial Statements Consolidated Statement of Financial Position  
CONSOLIDATED STATEMENT OF FINANCIAL  
POSITION AS OF 30 SEPTEMBER 2022  
30.09.2022  
30.09.2021  
ASSETS  
EUR 1,000  
EUR 1,000  
A. Non-current assets  
I. Intangible assets and goodwill  
(16)  
235,897.9
233,121.8
II. Property, plant and equipment  
(16)  
1,990,004.0
1,949,379.3
III. Investments (thereof at-equity companies:  
EUR 287,087.3 thousand (previous year:
EUR 233,868.9 thousand))
(17)  
327,531.7
264,704.9
IV. Other financial assets  
(18)  
126,827.3
80,318.4
2,680,260.9
2,527,524.4
V. Derivative financial instruments  
(24.4.)  
729,518.2
84,465.5
VI. Other non-current assets  
(19)  
8,156.8
32,404.7
VII. Deferred tax assets  
(15)  
4,651.3
6,606.3
3,422,587.2
2,651,000.9
B.  
Current assets  
I. Inventories  
(20)  
137,193.6
53,322.6
II. Derivative financial instruments  
(24.4.)  
1,239,345.1
287,236.5
III. Receivables and other assets  
(21)  
910,620.5
436,612.0
IV. Fixed term deposits and short-term investments  
(5.10.)  
273,472.6
105,775.3
V. Assets held for sale  
(32)  
-
122,220.1
VI. Cash and cash equivalents  
(22)  
929,449.9
219,197.3
3,490,081.7
1,224,363.8
6,912,668.9
3,875,364.7
30.09.2022  
30.09.2021  
LIABILITIES  
EUR 1,000  
EUR 1,000  
A. Equity  
I. Share capital  
(23)  
88,652.6
88,653.8
II. Capital reserves  
(23)  
216,616.1
216,596.3
III. Retained earnings  
(23)  
1,192,647.8
1,151,305.8
IV. Other reserves  
(23)  
280,435.6
63,314.4
V. Non-controlling interests  
(23)  
16,146.9
15,887.4
1,794,499.0
1,535,757.7
B. Non-current liabilities  
I. Financial liabilities  
(24)  
611,136.2
648,969.7
II. Non-current provisions  
(25)  
227,730.0
293,810.9
III. Deferred tax liabilities  
(15)  
128,368.6
62,576.9
IV. Construction cost subsidies  
(26)  
328,462.5
313,058.9
V. Advances received  
(27)  
1,849.0
475.2
VI. Derivative financial instruments  
(24.4.)  
1,130,824.9
88,405.5
VII. Other non-current liabilities  
(28)  
45,772.6
48,549.5
2,474,143.8
1,455,846.6
C. Current liabilities  
I. Financial liabilities  
(24)  
21,127.2
49,342.0
II. Current provisions  
(29)  
79,033.5
45,661.3
III. Tax provisions  
(30)  
176.6
109.2
IV. Trade payables  
(24)  
279,156.4
162,178.9
V. Liabilities related to assets held for sale  
(32)  
-
42,836.9
VI. Derivative financial instruments  
(24.4.)  
1,815,628.6
428,978.8
VII. Other current liabilities  
(31)  
420,689.0
182,868.1
2,644,026.1
883,760.4
6,912,668.9
3,875,364.7
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
151  
Consolidated Financial Statements Statement of Changes in Equity  
STATEMENT OF CHANGES IN EQUITY  
Reserves  
Reserves  
Share  
Capital  
Retained  
under  
under  
capital  
reserves  
earnings  
IAS 19  
IFRS 9  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Balance as of 30.09.2021  
88,653.8
216,596.3
1,151,305.8
-86,006.9
112,759.2
Items that will not be subsequently  
reclassified to the statement of  
income:  
Remeasurement of the defined benefit  
obligation  
-
-
-
44,162.3
-
Changes in value of associated at-equity  
companies recognised in equity  
-
-
-
43.3
-
Changes in value of investments and  
securities FVOCI  
-
-
-811.6
-
6,723.0
Deferred taxes  
-
-
117.0
-12,458.9
-924.5
Items that may be subsequently  
reclassified to the statement of  
income:  
Hedge accounting  
-
-
-
-
223,203.8
Hedge accounting at-equity companies  
-
-
-
-
763.4
Translation differences  
-
-
-
-
-
Deferred taxes  
-
-
-
-
-49,372.5
Other comprehensive income  
-
-
-694.6
31,746.7
180,393.2
Consolidated net earnings  
-
-
110,159.4
-
-
Total income for the period  
-
-
109,464.8
31,746.7
180,393.2
Dividend distribution  
-
-
-66,489.4
-
-
Treasury stocks  
-
18.6
-18.6
-
-
Other  
-1.2
1.2
-1,614.8
-
-
Transactions with shareholders  
-1.2
19.8
-68,122.8
-
-
Balance as of 30.09.2022  
88,652.6
216,616.1
1,192,647.8
-54,260.2
293,152.4
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
152  
Consolidated Financial Statements Statement of Changes in Equity  
Other reserves  
Equity of  
investors in  
Non-  
Revaluation  
Translation  
parent  
controlling  
reserve  
Treasury stocks  
difference  
Total  
company  
interests  
Total  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
37,541.1
-9,306.1
8,327.0
63,314.4
1,519,870.3
15,887.4
1,535,757.7
-
-
-
44,162.3
44,162.3
-421.7
43,740.6
-
-
-
43.3
43.3
-
43.3
-
-
-
6,723.0
5,911.4
-
5,911.4
(23)  
-
-
-
-13,383.4
-13,266.4
143.9
-13,122.5
-
-
-
223,203.8
223,203.8
-
223,203.8
(23)  
-
-
-
763.4
763.4
-
763.4
-
-
3,265.2
3,265.2
3,265.2
537.6
3,802.8
(5.19.)  
-
-
-
-49,372.5
-49,372.5
-
-49,372.5
-
-
3,265.2
215,405.1
214,710.5
259.8
214,970.3
-
-
-
-
110,159.4
1,061.6
111,221.0
-
-
3,265.2
215,405.1
324,869.9
1,321.4
326,191.3
-
-
-
-
-66,489.4
-748.0
-67,237.4
-
-18.6
-
-18.6
-18.6
-
-18.6
(23)  
1,734.7
-
-
1,734.7
119.9
-313.9
-194.0
1,734.7
-18.6
-
1,716.1
-66,388.1
-1,061.9
-67,450.0
39,275.8
-9,324.7
11,592.2
280,435.6
1,778,352.1
16,146.9
1,794,499.0
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
153  
Consolidated Financial Statements Statement of Changes in Equity  
Reserves  
Reserves  
Share  
Capital  
Retained  
under  
under  
capital  
reserves  
earnings  
IAS 19  
IFRS 9  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Balance as of 30.09.2020  
88,655.5
216,567.0
1,073,776.7
-83,324.7
1,476.3
Items that will not be subsequently  
reclassified to the statement of  
income:  
Remeasurement of the defined benefit  
obligation  
-
-
-
-3,565.8
-
Changes in value of associated at-equity  
companies recognised in equity  
-
-
-
-7.8
-
Changes in value of investments and  
securities FVOCI  
-
-
-
-
5,529.5
Deferred taxes  
-
-
-
891.4
-1,428.2
Items that may be subsequently  
reclassified to the statement of  
income:  
Hedge accounting  
-
-
-
-
142,749.5
Hedge accounting at-equity companies  
-
-
-
-
119.5
Translation differences  
-
-
-
-
-
Deferred taxes  
-
-
-
-
-35,687.4
Other comprehensive income  
-
-
-
-2,682.2
111,282.9
Consolidated net earnings  
-
-
130,747.1
-
-
Total income for the period  
-
-
130,747.1
-2,682.2
111,282.9
Dividend distribution  
-
-
-53,192.3
-
-
Treasury stocks  
-
27.6
-27.6
-
-
Other  
-1.7
1.7
1.9
-
-
Transactions with shareholders  
-1.7
29.3
-53,218.0
-
-
Balance as of 30.09.2021  
88,653.8
216,596.3
1,151,305.8
-86,006.9
112,759.2
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
154  
Consolidated Financial Statements Statement of Changes in Equity  
Other reserves  
Equity of  
investors in  
Non-  
Revaluation  
Translation  
parent  
controlling  
reserve  
Treasury stocks  
difference  
Total  
company  
interests  
Total  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
37,541.1
-9,278.5
2,945.7
-50,640.0
1,328,359.2
14,610.3
1,342,969.5
-
-
-
-3,565.8
-3,565.8
-27.5
-3,593.3
-
-
-
-7.8
-7.8
-
-7.8
-
-
-
5,529.5
5,529.5
-
5,529.5
(23)  
-
-
-
-536.8
-536.8
6.9
-529.9
-
-
-
142,749.5
142,749.5
4.8
142,754.3
(23)  
-
-
-
119.5
119.5
-
119.5
-
-
5,381.3
5,381.3
5,381.3
940.6
6,321.9
(5.19.)  
-
-
-
-35,687.4
-35,687.4
-1.2
-35,688.6
-
-
5,381.3
113,982.0
113,982.0
923.6
114,905.6
-
-
-
-
130,747.1
1,111.8
131,858.9
-
-
5,381.3
113,982.0
244,729.1
2,035.4
246,764.5
-
-
-
-
-53,192.3
-756.4
-53,948.7
-
-27.6
-
-27.6
-27.6
-
-27.6
(23)  
-
-
-
-
1.9
-1.9
-
-
-27.6
-
-27.6
-53,218.0
-758.3
-53,976.3
37,541.1
-9,306.1
8,327.0
63,314.4
1,519,870.3
15,887.4
1,535,757.7
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
155  
Consolidated Financial Statements Cash Flow Statement  
CASH FLOW STATEMENT  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Earnings before income taxes  
121,909.7
168,269.2
Tax payments  
-33,054.5
-31,025.8
(15)  
Earnings after income taxes  
88,855.2
137,243.4
Depreciation, amortisation and impairments/impairment reversals of non-current  
assets  
166,226.7
152,050.2
(16)  
Change in non-current provisions  
-22,340.3
-253.7
Change in other non-current assets  
24,247.8
-26,435.9
Change in other non-current liabilities and advances received  
-190.7
-2,319.5
Retained earnings of equity companies  
-10,653.4
-21,775.0
Construction cost subsidies received  
44,682.9
40,800.1
(26)  
Income from the reversal of construction cost subsidies  
-29,279.3
-28,092.9
(26)  
Losses from the disposal of assets  
2,048.7
1,540.9
Gains from the disposal of assets  
-38,069.2
-2,427.0
(32)  
Other non-cash expenses and income  
-1,457.1
-2,142.9
224,071.3
248,187.7
Change in current assets  
-256,467.6
-65,273.2
Payments from hedging transactions  
1,694,620.8
320,798.4
(24.1.)  
Non-cash items from derivatives  
-382,959.2
-44,880.7
(24.1.)  
Initial margins for derivatives  
-342,518.4
-50,881.8
(24.1.)  
Change in current liabilities  
169,688.3
-54,254.1
Change in current provisions  
30,085.8
24,977.2
Cash flow from operating activities  
1,136,521.0
378,673.5
Inflow from the disposal of property, plant and equipment, and intangible assets  
1,783.3
4,194.1
Outflow for additions to property, plant, equipment and intangible assets  
-184,499.4
-198,072.5
(16)  
Inflow from the disposal of financial assets  
34,806.7
13,579.1
Change in scope of consolidation less acquired cash  
-3,259.4
-
(3)  
Outflow for additions to financial assets and other financial investments  
-189,105.5
-34,891.4
Cash flow from investments  
-340,274.3
-215,190.7
Dividend distribution  
-67,237.4
-53,948.7
(34)  
Acquisition of own shares and non-controlling interests  
-237.8
-27.6
Issuance of registered bonds  
-
75,000.0
(24.7.)  
Other changes in financial liabilities  
-18,660.2
-11,795.1
(24.7.)  
Cash flow from financing activities  
-86,135.4
9,228.6
Total cash flow  
710,111.3
172,711.4
Cash funds at beginning of period  
219,197.3
46,304.8
(22)  
Cash flow  
710,111.3
172,711.4
Exchange rate effects  
141.3
181.1
Cash funds at end of period  
929,449.9
219,197.3
(22)  
The cash flow from operating activities includes:  
Interest received  
1,103.8
1,000.0
Interest paid  
24,309.7
21,312.9
Dividends received  
15,683.3
9,331.5
(17)  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
156  
Consolidated Financial Statements Notes  
NOTES TO THE CONSOLIDATED FINANCIAL  
STATEMENTS 2021/2022  
OF ENERGIE AG OBERÖSTERREICH  
GENERAL NOTES  
1.  
General disclosures  
The Energie AG Oberösterreich Group is a modern and competitive energy and service  
provider in the Energy, Grid, Waste Management, Czech Republic and Holding & Services  
Segments.  
The parent company of the Group is Energie AG Oberösterreich with registered office at  
Böhmerwaldstraße 3 in Linz, Austria .  
The Consolidated Financial Statements of Energie AG Oberösterreich for the  
2021/2022 fiscal year were drawn up in accordance with the International Financial Reporting  
Standards (IFRS), published by the International Accounting Standards Board (IASB), as they  
were required to be applied as of the reporting date, as well as in accordance with the  
interpretations of the International Financial Reporting Committee (IFRIC) as adopted by the  
European Union.  
The present Consolidated Financial Statements according to the IFRS release the company  
from its obligation under § 245 a of the Austrian Commercial Code to prepare consolidated  
annual financial statements in keeping with the Austrian Commercial Code. Whenever the  
Austrian Commercial Code so requires, additional disclosures are made in the respective  
notes.  
The figures in the Consolidated Financial Statements are reported thousands of euros  
(EUR 1,000). The use of automated calculation systems may give rise to rounding differences  
when adding up rounded figures and percentages.  
2.  
Change in accounting methods  
2.1.  
Standards and interpretations applied or amended and adopted by the EU for  
the first time  
Newly applicable amended standards adopted by the EU that take effect on 1 January 2021  
or later:  
IFRS 9, IAS 39, IFRS 7, IFRS 4 and IFRS 16 (Amendments: Interest Rate Benchmark  
Reform – Phase 2)  
IFRS 4 (Amendments: Extension of the Temporary Exemption from Applying IFRS 9)  
IFRS 16 (Amendments: Covid-19-Related Rent Concessions beyond 30 June 2021)  
The amended standards do not have a material impact on the Consolidated Financial  
Statements.  
2.2.  
Standards and interpretations that have not been applied early  
In the 2021/2022 Consolidated Financial Statements, the following amendments adopted by  
the EU were not applied early:  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
157  
Consolidated Financial Statements Notes  
Entry into force in the EU on 1 January 2022 or later:  
IFRS 3 (Amendments: Reference to the Conceptual Framework)  
IAS 37 (Amendments: Onerous Contracts – Costs of Fulfilling a Contract)  
IAS 16 (Amendments: Property, Plant & Equipment: Proceeds before Intended Use)  
Annual Improvements to IFRS Standards 2018-2020 Cycle (Amendments to IFRS 1,  
IFRS 9, IFRS 16 and IAS 41)  
IFRS 17 (Insurance Contracts)  
IFRS 17 (Amendements: Intitial Application of IFRS 17 and IFRS 9 – Comparative  
Information)  
IAS 1 (Amendments: Disclosure of Accounting Policies)  
IAS 8 (Amendments: Definition of Accounting Estimates)  
IAS 12 (Amendments: Deferred Tax related to Assets and Liabilities arising from a Single  
Transaction)  
The following standards and interpretations, amendments and improvements of standards  
enter into force on 1 January 2023 or a later date, although they have not yet been adopted  
by the European Union at this time:  
IAS 1 (Amendments: Classification of Liabilities as Current or Non-current)  
IFRS 16 (Amendments: Lease Liability in a Sale and Leaseback)  
IAS 1 (Amendments: Non-Current Liabilities with Covenants)  
These standards are expected to be applied on the effective date promulgated by the EU.  
The following standard came into force on 1 January 2016, but was not adopted by the EU:  
IFRS 14 (Regulatory Deferral Accounts)  
Application of the following standard was postponed indefinitely:  
IFRS 10 and IAS 28 (Amendments: Sale or Contribution of Assets between an Investor  
and its Associate or Joint Venture)  
The first-time application of these standards is not expected to result in any significant  
implications for the Consolidated Financial Statements.  
2.3.  
Derivative financial instruments  
In the previous year, surpluses from derivative financial instruments were recognised in the  
item “Other non-current assets” (EUR 84,465.5 thousand) as well as in the item “Receivables  
and other assets” (EUR 287,236.5 thousand). Deficits were recognised in the item “Other  
non-current liabilities” (EUR 88,405.5 thousand) and “Other current liabilities” (EUR  
428,978.8). Owing to materiality criteria, the amounts were recognised in separate balance  
sheet items (“Derivative financial instruments”) from 30 September 2022 onward and the  
previous year was restated accordingly.  
2.4.  
Eco-social tax reform  
One of the effects of the eco-social tax reform is a change in the tax rate for corporate tax.  
The previous rate of 25% applicable in Austria will be reduced to 24% in calendar year 2023  
and to 23% from calendar year 2024. The future tax rates (24.25% for 2022/2023; 23.25%  
for 2023/2024; 23% from 2024/2025) were applied when calculating the deferred tax assets  
and liabilities. The adjustment resulted in a recognition of EUR 5.2 million of income through  
profit and loss and a further EUR 5.7 million of income through equity.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
158  
Consolidated Financial Statements Notes  
3.  
Scope of consolidation  
3.1.  
Principles  
Subsidiaries  
All material entities that are directly or indirectly controlled by Energie AG Oberösterreich  
(subsidiaries) are fully consolidated according to IFRS 10 and included in the Consolidated  
Financial Statements. Control exists when the investor is exposed or has rights to variable  
returns from its involvement with the investee and has the ability to use its power over the  
investee to influence the amount of the investor’s returns. In all cases, the control results from  
the equity instruments that are held (participating interests in the company and shares).  
Joint arrangements  
IFRS 11 outlines accounting by entities that jointly control an arrangement. Joint control  
involves the contractually agreed sharing of control. If the controlling parties have rights to  
the net assets of the arrangement (joint venture), the equity method is used for financial  
reporting. If the controlling parties have rights to the assets, and obligations for the liabilities,  
relating to the agreement (joint operations), the assets and liabilities, as well as the income  
and expenses, are recognised using proportionate consolidation.  
Joint operations  
Ennskraftwerke Aktiengesellschaft produces electricity with hydropower plants. Gas- und  
Dampfkraftwerk Timelkam GmbH supplies electricity from the operation of a combined cycle  
gas-turbine power plant.  
The Group holds a strategic interest of 50% in both Ennskraftwerke Aktiengesellschaft and  
Gas- und Dampfkraftwerk Timelkam GmbH. The entities are not controlled by any party.  
Under the existing electricity supply contracts, the investors purchase the electric energy  
produced by the Group companies, where the internal price is calculated on a pro-rata basis  
of the production costs, plus a corresponding profit margin. Due to the electricity supply  
contracts, the parties have rights to the assets. As the arrangements’ liabilities can only be  
settled with these cash flows, the parties have obligations for the liabilities relating to the  
joint arrangement. Ennskraftwerke Aktiengesellschaft and Gas- und Dampfkraftwerk  
Timelkam GmbH are therefore classified as joint operations according to IFRS 11.  
The share of the assets and liabilities, as well as the revenues and expenses are reported in  
the Consolidated Financial Statements. The average share of the electricity supply (38%) is  
used to determine the share for the pro rata recognition of Ennskraftwerke  
Aktiengesellschaft. The share of the electricity procured from Gas- und Dampfkraftwerk  
Timelkam GmbH, amounting to 70%, is used for the consolidation of the company.  
Joint ventures  
Due to special agreements under company law, no control exists for “Papyrus”  
Altpapierservice Handelsgesellschaft m.b.H. (Salzburg), Papyrus Wertstoff Service GmbH (Bad  
Reichenhall, Germany) or for Fernwärme Steyr GmbH, despite holding a majority of the  
voting rights. These entities are controlled jointly with other investors and are therefore  
accounted for using the equity method.  
Associated companies  
Companies in which Energie AG Oberösterreich exercises a significant influence (associated  
companies) are consolidated using the equity method. Significant influence exists due to  
holdings of the entity’s share capital. Salzburg AG für Energie, Verkehr und  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
159  
Consolidated Financial Statements Notes  
Telekommunikation is an infrastructure provider for energy, transport and  
telecommunication. Wels Strom GmbH is an energy utility and service company.  
The changes in the scope of consolidation are as follows:  
Full  
Proportionate  
Equity  
consolidation  
consolidation  
consolidation  
30.09.2021  
49  
2
11  
Inclusion for the first time  
1
-
2
Merger  
-1  
-
-
30.09.2022  
49  
2
13  
Energie AG Teplo Rokycany s.r.o. was merged with Tepelné zásobování Rakovník spol. s.r.o.  
and subsequently renamed Energie AG Teplo Bohemia s.r.o.  
In the Czech Republic Segment, RATE s.r.o (Czech Republic, Štětí) was fully consolidated for  
the first time, with the implications thereof for the Consolidated Financial Statements being  
insignificant. The entity is involved in supplying heating and hot water, as well as providing  
the related services.  
BBOÖ Breitband Oberösterreich GmbH (50%) and its wholly-owned subsidiary Breitband  
Oberösterreich Infrastruktur GmbH have been included for the first time in the Consolidated  
Financial Statements for the present fiscal year using the equity method. Please refer to  
section 32 “Non-current assets held for sale” › Page 232 here.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
160  
Consolidated Financial Statements Notes  
Joint ventures  
The Statement of Financial Position and the Statement of Income of the joint ventures  
(100%) presents as follows:  
BBOÖ Breitband Oberösterreich  
GmbH, Breitband Oberösterreich  
Infrastruktur GmbH  
Windpower EP GmbH  
Other joint ventures  
30.09.2022 30.09.2021  
30.09.2022  
30.09.2021  
30.09.2022 30.09.2021  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
Non-current  
assets  
183.4  
-
27.4  
28.6  
52.9  
52.5  
Current assets  
81.6  
-
8.2  
6.4  
27.7  
24.8  
265.0  
-
35.6  
35.0  
80.6  
77.3  
Equity  
76.5  
-
7.2  
4.8  
32.4  
27.5  
Non-current  
liabilities  
97.1  
-
26.4  
29.4  
37.4  
16.8  
Current liabilities  
91.4  
-
2.0  
0.8  
10.8  
33.0  
265.0  
-
35.6  
35.0  
80.6  
77.3  
Cash and cash  
equivalents  
75.5  
-
7.3  
2.1  
5.5  
3.0  
Non-current  
financial  
liabilities  
-
-
25.2  
28.3  
26.1  
30.0  
Current financial  
liabilities  
67.5  
-
0.2  
0.2  
2.1  
2.0  
BBOÖ Breitband Oberösterreich  
GmbH, Breitband Oberösterreich  
Infrastruktur GmbH  
Windpower EP GmbH  
Other joint ventures  
2021/2022  
2020/2021  
2021/2022  
2020/2021  
2021/2022  
2020/2021  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
Sales revenues  
1.7  
-
10.3  
5.8  
69.3  
55.7  
Depreciation,  
amortisation and  
impairments  
-12.6  
-
-2.9  
-2.9  
-3.6  
-3.6  
Interest income  
-
-
-
-
0.2  
0.2  
Interest expense  
-0.5  
-
-0.3  
-0.5  
-0.6  
-0.6  
Taxes  
0.2  
-
-1.5  
-0.4  
-1.9  
-0.9  
Earnings after  
taxes  
-6.6  
-
4.4  
1.1  
5.8  
3.3  
Share in net  
assets  
as of 01.10.  
-
-
2.3  
1.7  
12.3  
10.9  
Inclusion for the  
first time  
41.6  
-
-
-
-
-
Profit for the  
period  
-3.3  
-
3.0  
0.6  
2.8  
1.7  
Dividends  
-
-
-1.7  
-
-0.6  
-0.3  
Share in net  
assets  
as of 30.09.  
38.3  
-
3.6  
2.3  
14.5  
12.3  
Goodwill  
0.2  
-
-
-
0.7  
0.7  
Carrying  
amount  
as of 30.09.  
38.5  
-
3.6  
2.3  
15.2  
13.0  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
161  
Consolidated Financial Statements Notes  
Associated companies  
The Statement of Financial Position and the Statement of Income of the associated  
companies (100%) presents as follows:  
Salzburg AG für Energie, Verkehr  
und Telekommunikation  
Wels Strom GmbH  
Other associated companies  
30.09.2022  
30.09.2021  
30.09.2022 30.09.2021  
30.09.2022  
30.09.2021  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
Non-current  
assets  
1,552.0  
1,438.3  
94.2  
99.8  
5.4  
5.9  
Current assets  
392.2  
96.5  
26.4  
16.5  
4.6  
3.1  
1,944.2  
1,534.8  
120.6  
116.3  
10.0  
9.0  
Equity  
605.5  
588.0  
25.2  
19.7  
7.2  
5.9  
Non-current  
liabilities  
735.8  
675.6  
29.0  
32.6  
2.6  
2.5  
Current liabilities  
602.9  
271.2  
66.4  
64.0  
0.2  
0.6  
1,944.2  
1,534.8  
120.6  
116.3  
10.0  
9.0  
Salzburg AG für Energie, Verkehr  
und Telekommunikation  
Wels Strom GmbH  
Other associated companies  
2021/2022  
2020/2021  
2021/2022  
2020/2021  
2021/2022  
2020/2021  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
Sales revenues  
2,661.2  
1,623.1  
182.7  
119.0  
7.6  
5.0  
Earnings after  
taxes  
47.8  
50.0  
10.7  
-4.8  
2.0  
1.5  
Dividends  
-30.3  
-25.7  
-5.2  
-
-0.9  
-0.9  
Share in net  
assets  
as of 01.10.  
153.7  
147.2  
9.6  
12.1  
2.4  
2.2  
Profit for the  
period  
12.5  
13.2  
5.2  
-2.5  
0.8  
0.6  
Reversal of  
impairment  
-
-
3.5  
-
-
-
Dividends  
-8.0  
-6.7  
-2.5  
-
-0.3  
-0.4  
Share in net  
assets  
as of 30.09.  
158.2  
153.7  
15.8  
9.6  
2.9  
2.4  
Goodwill  
19.7  
19.7  
33.2  
33.2  
-
-
Carrying  
amount  
as of 30.09.  
177.9  
173.4  
49.0  
42.8  
2.9  
2.4  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
162  
Consolidated Financial Statements Notes  
3.2.  
Group companies  
Interest held  
in %  
Consolidation  
Domicile  
(prev. year)  
(prev. year)  
Austria  
Parent  
Energie AG Oberösterreich  
Linz  
company  
Energie AG Group Treasury GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Businesskunden GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Business Services GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Bohemia GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Customer Services GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Erzeugung GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Kraftwerk Ennshafen GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Kommunalservice GmbH  
Wels  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Personalmanagement GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Personal Power GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Renewable Power GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Service- und Beteiligungsverwaltungs-GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Telekom GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Tech Services GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Trading GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Umwelt Holding GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Umwelt Service GmbH  
Wels  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Vertrieb GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie-Contracting Steyr GmbH  
Steyr  
100.00 (100.00)  
FC (FC)  
Abfall-Aufbereitungs-GmbH  
Hörsching  
100.00 (100.00)  
FC (FC)  
ASPG Altlastensanierungsprojekte GmbH  
Wels  
100.00 (100.00)  
FC (FC)  
Cogeneration-Kraftwerke Management Oberösterreich GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Energie AG Oberösterreich Öko GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
IfEA Institut für Energieausweis GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Netz Oberösterreich GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
Wertstatt 8 GmbH  
Linz  
100.00 (100.00)  
FC (FC)  
MA Restabfallverwertung GmbH  
Wels  
99.00 (99.00)  
FC (FC)  
WDL-Wasserdienstleistungs GmbH  
Linz  
90.00 (90.00)  
FC (FC)  
Market Calling Marketing GesmbH  
Linz  
60.00 (60.00)  
FC (FC)  
Ennskraftwerke Aktiengesellschaft  
Steyr  
50.00 (50.00)  
JO (JO)  
Gas- und Dampfkraftwerk Timelkam GmbH  
Linz  
50.00 (50.00)  
JO (JO)  
"Papyrus" Altpapierservice Handelsgesellschaft m.b.H.  
Salzburg  
63.33 (63.33)  
JV (JV)  
Fernwärme Steyr GmbH  
Steyr  
51.00 (51.00)  
JV (JV)  
AMR Austrian Metal Recovery GmbH  
Linz  
50.00 (50.00)  
JV (JV)  
BBOÖ Breitband Oberösterreich GmbH  
Linz  
50.00 (-)  
JV (-)  
Breitband Oberösterreich Infrastruktur GmbH (formerly: OÖ Breitband  
Infrastruktur GmbH)  
Linz  
50.00 (100.00)  
JV (UC)  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
163  
Consolidated Financial Statements Notes  
Interest held  
in %  
Consolidation  
Domicile  
(prev. year)  
(prev. year)  
Windpower EP GmbH  
Parndorf  
50.00 (50.00)  
JV (JV)  
Bioenergie Steyr GmbH  
Behamberg  
49.00 (49.00)  
JV (JV)  
Ried im  
Energie Ried Wärme GmbH  
Innkreis  
40.00 (40.00)  
JV (JV)  
Wels Strom GmbH  
Wels  
49.00 (49.00)  
AC (AC)  
Geothermie-Wärmegesellschaft Braunau-Simbach mbH  
Braunau  
40.00 (40.00)  
AC (AC)  
Salzburg AG für Energie, Verkehr und Telekommunikation  
Salzburg  
26.13 (26.13)  
AC (AC)  
mieX GmbH  
Peilstein  
100.00 (100.00)  
UC (UC)  
Oberösterreichische Gemeinnützige Bau- und Wohngesellschaft mit beschränkter  
Haftung  
Linz  
- (100.00)  
- (UC)  
Energy IT Service GmbH  
Linz  
66.67 (66.67)  
UC (UC)  
BBI Breitbandinfrastruktur GmbH  
Linz  
55.00 (55.00)  
UC (UC)  
RVL Reststoffverwertung Lenzing GmbH  
Lenzing  
50.00 (50.00)  
UC (UC)  
WDL Infrastruktur GmbH  
Linz  
49.00 (49.00)  
UC (UC)  
OÖ Science-Center Wels Errichtungs-GmbH  
Wels  
50.00 (50.00)  
UC (UC)  
Ried im  
GRB Geothermie Ried Bohrung GmbH  
Innkreis  
40.00 (40.00)  
UC (UC)  
Recycling Innsbruck GmbH  
Innsbruck  
25.00 (25.00)  
UC (UC)  
Czech Republic  
České  
ČEVAK a.s.  
Budějovice  
100.00 (100.00)  
FC (FC)  
ENERGIE AG BOHEMIA s.r.o.  
Praha  
100.00 (100.00)  
FC (FC)  
Energie AG Teplo Vimperk s.r.o.  
Vimperk  
100.00 (100.00)  
FC (FC)  
Energie AG Teplo Rokycany s.r.o.  
Rokycany  
- (100.00)  
- (FC)  
RATE s.r.o.  
Štětí  
100.00 (-)  
FC (-)  
Energie AG Teplo Bohemia s.r.o.  
(formerly: Tepelné zásobování Rakovník spol. s r.o.)  
Rakovník  
100.00 (100.00)  
FC (FC)  
VAK Zápy s.r.o.  
Zápy  
100.00 (100.00)  
FC (FC)  
Moravská  
VHOS a.s.  
Třebová  
100.00 (100.00)  
FC (FC)  
Vodárenská společnost Beroun s.r.o.  
Beroun  
100.00 (100.00)  
FC (FC)  
České  
VODOS Velkoobchod s.r.o.  
Budějovice  
100.00 (100.00)  
FC (FC)  
Energie AG Kolin a.s.  
Kolín  
97.33 (97.30)  
FC (FC)  
Vodárenská společnost Chrudim a.s.  
Chrudim  
95.00 (95.00)  
FC (FC)  
SATEZA a.s.  
Šumperk  
95.83 (91.67)  
FC (FC)  
Rychnov nad  
Aqua Servis a.s.  
Kněžnou  
66.00 (66.00)  
FC (FC)  
Vodovody a kanalizace Beroun a.s.  
Beroun  
59.29 (59.22)  
FC (FC)  
České  
1. Jihočeská vodohospodářská spol. s r.o.  
Budějovice  
100.00 (100.00)  
UC (UC)  
DÉMOS, spol. s r.o.  
Ústí nad Orlicí  
100.00 (100.00)  
UC (UC)  
DÉMOS – správa, s.r.o.  
Ústí nad Orlicí  
100.00 (100.00)  
UC (UC)  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
164  
Consolidated Financial Statements Notes  
Interest held  
in %  
Consolidation  
Domicile  
(prev. year)  
(prev. year)  
České  
Vodovod Radyně a.s.  
Budějovice  
100.00 (100.00)  
UC (UC)  
Italy  
ECOFE S.R.L.  
Meran  
100.00 (100.00)  
FC (FC)  
Energie AG Südtirol Umwelt Service GmbH  
Neumarkt  
100.00 (100.00)  
FC (FC)  
Salvatonica Energia S.R.L.  
Meran  
100.00 (100.00)  
FC (FC)  
Germany  
Erdgas Oberösterreich Vertriebs GmbH  
Tittling  
100.00 (100.00)  
FC (FC)  
Bad  
Papyrus Wertstoff Service GmbH  
Reichenhall  
63.33 (63.33)  
JV (JV)  
Geothermie-Fördergesellschaft Simbach-Braunau mbH  
Simbach  
40.00 (40.00)  
AC (AC)  
Poland  
Finadvice Fair Energy Wind Development Sp. z o.o.  
Warszawa  
- (100.00)  
- (UC)  
Finadvice Fair Energy Wind Development 5 Sp. z o.o.  
Warszawa  
- (100.00)  
- (UC)  
Hungary  
Energie AG Heves Régió Környezetvédelmi és Hulladékgazdálkodási Korlátolt  
Felelősségű Társaság  
Miskolc  
100.00 (100.00)  
FC (FC)  
FC fully consolidated entities  
JV Joint ventures consolidated at equity  
JO joint operation, proportional consolidation of the assets, liabilities, expenses and income  
AC associated company consolidated at equity  
UC entities unconsolidated due to immateriality  
4.  
Consolidation methods  
Capital consolidation uses the purchase method of accounting, under which the fair value of  
the consideration paid for the acquired company is offset from the proportionate revaluated  
equity of the subsidiaries at the acquisition date. The non-controlling interests are measured  
at the fair value of the attributable assets and liabilities of the acquiree (partial goodwill  
method).  
Goodwill from business combinations is measured according to IFRS 3. The acquired goodwill  
is essentially based on expected future earnings and synergy effects. The impairment of  
goodwill is tested at least once each year in accordance with IAS 36. Negative differences are  
recognised through profit or loss in accordance with IFRS 3.  
The financial statements of the entities fully or proportionally consolidated in the  
Consolidated Financial Statements are reported according to uniform accounting and  
measurement principles. The separate financial statements of the fully consolidated entities,  
joint operations and joint ventures, as well as the entities accounted for using the equity  
method, are reported at the date of the Consolidated Financial Statements, or interim reports  
are prepared.  
Intragroup receivables and liabilities, expenses and income, as well as interim results are  
eliminated.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
165  
Consolidated Financial Statements Notes  
5.  
Accounting and measurement principles  
5.1.  
General conditions  
The 2021/2022 fiscal year saw a significant easing of the constraints and impacts of the  
COVID-19 pandemic compared with the previous year. The year under review was influenced,  
among other things, by the outbreak of the Russian-Ukrainian war and related sanctions,  
volatile prices for electricity and gas at a high level, and an increase in interest rates and  
inflation.  
The higher prices for electricity and gas are taken into account in the impairment testing of  
assets. The increase in interest rates affects in particular the discounting of provisions for  
social capital and other non-current provisions (see section 25 Non-current  
provisions › Page 224). The increase in inflation leads, among other things, to a change in  
the assessment of future wage, salary and pension development.  
To support the Austrian economy during the Corona crisis, the Austrian Federal Government  
has launched a programme aimed at promoting business investment. Investments in  
depreciating non-current assets are promoted with a one-off non-repayable subsidy of 7% or  
14% of the investment amount. The subsidy is granted on condition that a so-called “first  
measure” (order placement, conclusion of a purchase contract, down payment, construction  
start etc.) is implemented by no later than 31 May 2021. Commissioning and payment must  
take place by no later than 28 February 2023; this date may be extended to 28 February  
2025 under certain conditions. Subsidiaries from Austria have already applied for the  
investment bonus and funding approvals have been received. As of 30 September 2022,  
claims for subsidies in an amount of EUR 3,292.0 thousand were recognised for already  
implemented investments. The corresponding liability item is reported under other non-  
current liabilities and will be eliminated through profit or loss in accordance with their useful  
lives after completion of the assets.  
5.2.  
Estimates  
Compiling the Consolidated Financial Statements required estimates to be made that  
influence the assets, liabilities and equity, income, and expenses, as well as the figures  
disclosed in the Notes.  
In particular, estimates and assumptions are made in calculating provisions and in testing  
asset impairment.  
Estimates and assumptions in the area of personnel provisions primarily involve interest rates,  
wage and salary trends and fluctuation.  
The salary trend used to determine the personnel provisions consists of the expected future  
increase of salaries and wages under collective agreements and the average increases of  
salaries and wages.  
The interest rate for discounting the personnel provisions is determined by an external service  
provider on the basis of “high quality corporate bonds” and adjusted for the company’s  
internal duration.  
The interest rate for discounting the other non-current provisions is based on a no-risk  
interest rate determined on the basis of AAA-rated treasury bills.  
In the course of testing the impairment of assets and goodwill, estimates are made  
concerning future cash flows and interest rates (see section 5.5. › Page 167 and following  
items).  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
166  
Consolidated Financial Statements Notes  
The estimates made may differ from the figures that actually result in the future and influence  
subsequent Consolidated Financial Statements. In respect to the possible effects of changes  
in estimates, please refer to the sensitivity analyses concerning impairment testing and  
actuarial parameters.  
Estimates affect the following items in the Statement of Financial Position:  
30.09.2022  
30.09.2021  
Carrying amounts  
EUR 1,000  
EUR 1,000  
Goodwill  
89,725.5  
87,316.9  
Property, plant and equipment  
1,990,004.0  
1,949,379.3  
Investments  
327,531.7  
264,704.9  
Non-current provisions  
227,730.0  
293,810.9  
Current provisions  
79,033.5  
45,661.3  
5.3.  
Intangible assets  
The goodwill resulting from the acquisition of subsidiaries is reported under intangible assets.  
Goodwill is recognised at cost less accumulated impairment losses.  
Other assets acquired by the Group that have limited useful lives are recognised at cost less  
accumulated amortisation and accumulated impairment losses.  
Under certain circumstances according to IAS 38 (Intangible Assets), development costs are to  
be capitalised as self-created intangible assets and subsequently amortised over their useful  
lives.  
With the exception of goodwill, intangible assets are amortised over the period of the  
following estimated useful lives:  
Useful life  
in years  
Intangible assets  
Procurement rights  
15-99  
Other rights  
4-50  
Customer base  
10-25  
depending on  
Dumping rights and landfills  
utilization  
Costs for research activities with the prospect of providing new scientific or technical insights  
are recognised as expenses.  
5.4.  
Property, plant and equipment  
Property, plant and equipment are recognised at cost less accumulated depreciation and  
accumulated impairment losses.  
The costs include expenses that are directly attributable to the acquisition of the asset. The  
costs for self-constructed assets include:  
Material costs and production wages, including material and production overheads.  
General administrative expenses are not capitalised  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
167  
Consolidated Financial Statements Notes  
All other costs directly attributable to bringing the assets into working condition for their  
intended use  
The estimated costs of dismantling and removing the objects and restoring the site  
Capitalised borrowing costs  
Subsequent expenses are only capitalised when it is probable that the future economic  
benefit associated with these expenses will flow to the Group. Ongoing repairs and  
maintenance are immediately recognised as expenses.  
Property, plant and equipment are depreciated from the date on which they are available for  
use, or in the case of self-constructed assets, from the date the asset is complete and ready  
for use.  
As far as different useful lives are to be applied for material non-current assets, these are  
recognised according to the component approach (IAS 16.43).  
The depreciation of significant property, plant and equipment is recognised according to the  
following, Group-wide uniform useful lives:  
Useful life  
in years  
Constructions  
Buildings  
50  
Other structures  
10-50  
Water engineering structures  
50-75  
Manufacturing plant and equipment  
Power plants  
10-50  
Electricity grid  
15-40  
Waste management systems  
6-20  
Telecommunications facilities  
7-20  
Furniture and fixtures  
3-10  
5.5  
Impairment of goodwill  
In the fourth quarter of each fiscal year, or during the course of the year when an impairment  
indicator arises, any potentially incurred impairment losses are determined by subjecting the  
goodwill to an impairment test. For this, goodwill is allocated to units that are expected to  
benefit from the expectations for future earnings and synergies of the combination. The  
goodwill of the Sales business unit is allocated to the cash generating unit “Sales” in  
accordance with Group controlling and reporting. In the Waste Management Segment, the  
Group companies are combined by country due to the existing management and reporting  
structures in Austria. In the Czech Republic Segment, the cash generating unit CEVAK a.s.  
corresponds to the entity.  
An impairment loss is recognised when the carrying amount of a cash generating unit  
exceeds its recoverable amount. The recoverable amount corresponds to the larger amount  
resulting from the fair value less the costs of disposal or the value in use. The value in use is  
determined by discounting future cash flows that are expected to be derived from a cash-  
generating unit. The fair value less cost of disposal is assessed from an external perspective,  
the value in use is assessed from the internal perspective of the company.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
168  
Consolidated Financial Statements Notes  
The cash flows used to determine the value in use are based on the five-year mid-term  
planning approved by the Management Board. The planning figures are based both on past  
experience and on external sources of information. The assumptions concerning cash flows  
beyond the period of detailed planning are based on analyses of the past as well as on  
forecasts for the future. Future restructuring measures and expansion investments, for which  
no funds were expended or no obligation incurred yet, are not included. A growth rate of  
1.0% (previous year: 1.0%) is assumed for the time after the detailed planning period. The  
growth rate is based on electricity prices and forecasts for future GDP growth, as well as  
expected increases in expenses. The assumptions concerning future GDP growth are based on  
European Commission publications. The testing of goodwill impairment is based on the  
goodwill’s value in use.  
The discount interest rate is an interest rate after taxes that reflects the current market  
estimates and the specific risks of the cash-generating unit.  
5.5.1.  
Planning assumption for Sales  
The planning of the cash generating unit Sales is broken down into the sectors electricity (key  
account customers; business, commercial and private customers), gas, heat and telecom  
sales, as well as customer projects and services.  
The volatility on the energy markets meant that planning was carried out separately for the  
main and secondary brands in the electricity and gas units on the basis of achievable margins.  
The assumptions for the future electricity and gas procurement costs are based, where  
available, on market data; where market data was unavailable, estimates were based on  
market surveys and assumptions.  
The inflation rate is used to extrapolate the future external costs.  
5.5.2.  
Planning assumptions in the Waste Management Segment  
Planning in the Waste Management Segment is based on the Group-wide central planning  
assumptions concerning economic growth, inflation and the development of interest rates  
and exchange rates during the planning period.  
Sales planning is based on detailed planning for the individual products and services of each  
location. In the area of waste incineration plants and key account customers, single-customer  
planning based on contractual parameters was also used. For waste and recycling materials, a  
price development was used for the planning period that was realistic to assume at the time  
of planning. For the other products and services, an expected course of business development  
was projected and the sales revenues from electricity and district heating were determined on  
the basis of contracts or prospective forecasting.  
The recycling and throughput volumes were planned for the major waste management  
systems based on expected market developments. The expected throughput is  
305,000 tonnes for the Wels waste incineration plant and 295,000 tonnes for the Lenzing  
waste recycling plant.  
The material expense items such as personnel expenses, vehicle fleet costs, maintenance and  
taxes were planned in line with the sales and plant planning.  
5.5.3.  
Planning assumptions for the Czech Republic Segment  
Planning for the Czech Republic Segment is based on centrally defined, country-specific  
planning parameters like the development of the inflation rate and economic growth, as well  
as interest rates and exchange rates.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
169  
Consolidated Financial Statements Notes  
Sales planning in the area of drinking water and waste water as well as for the heating sector  
in the Czech Republic is based on a quantity and price structure that in turn is based on a  
trend for sales planning extrapolated from historical consumption data and the planning  
parameters. The planned drinking water, waste water prices and heating prices have been  
determined by each planning unit, taking into consideration the existing contract data and  
estimates of the future development of expenses, and in compliance with any applicable  
general regulatory conditions.  
For the planning of material expense items in the Czech Republic Segment, country-specific  
planning parameters were determined using the estimates of external analysts. In particular,  
this includes price developments for untreated water, chemicals, and fuels, as well as prices  
for electricity and gas.  
A major planning assumption is that existing contracts for drinking water and waste water  
with the municipal bodies and water authorities are maintained.  
5.6.  
Impairment of other intangible assets and property, plant and equipment  
According to IAS 36 (Impairment of Assets), intangible assets and property, plant and  
equipment are to be subjected to an impairment test when there is evidence that an asset or  
cash-generating unit might be impaired or a previously recognised impairment needs to be  
reversed. An impairment is recognised when the carrying amount exceeds the recoverable  
amount of the asset or cash generating unit. The recoverable amount is the larger amount  
resulting from the fair value less the costs of disposal or the value in use.  
The value in use is determined by discounting future cash flows that are expected to be  
derived from a cash-generating unit. The cash flows used to determine the value in use are  
based on the five-year mid-term planning approved by the Management Board. For the  
subsequent period, a perpetual annuity or a calculation up to the expected end of the useful  
life of the object is recognised. The planning figures are based both on past experience and  
on external sources of information. Future restructuring and expansion investments are not  
included. The discount interest rate is an interest rate after taxes that reflects the current  
market estimates and the specific risks of the cash-generating unit.  
The fair value less cost of disposal is assessed from an external perspective, the value in use is  
assessed from the internal perspective of the company.  
5.7.  
Investments  
The measurement of investments in companies accounted for using the equity method is  
increased or decreased according to the changes in equity and impairments/reversal of  
impairments in proportion to the capital share held. The movements in equity are recognised  
through profit or loss or in the other comprehensive income.  
5.8.  
Inventories  
Inventories are measured at average historical cost (moving average cost method) or at the  
lower net realisable value. Costs include direct costs as well as proportionate material and  
production overhead.  
Impairments due to reduced realisable value are recognised using write-downs.  
5.9.  
Emissions allowances  
The CO2 emissions allowances issued free of charge according to the Austrian Gas Emissions  
Allowances Act are measured at fair value at the date of allocation and recognised both  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
170  
Consolidated Financial Statements Notes  
under current receivables and under current liabilities. Fluctuations in fair value are recognised  
in the Statement of Income. In the course of using the emissions allowances, corresponding  
provisions are built up and the reduction of the liability from their allocation is recognised in  
the Statement of Income. Upon delivery of the emissions allowances to the registration office,  
the provision is netted against the asset.  
Emissions allowances purchased on the market are recognised under current receivables.  
Fluctuations in fair value are recognised in the Statement of Income. In the course of using  
the emissions allowances, corresponding provisions are built up. Upon delivery of the  
emissions allowances to the registration office, the provision is netted against the asset.  
5.10.  
Fixed term deposits and short-term investments  
The item “Fixed term deposits” includes highly liquid fixed term deposits with an original  
maturity of more than three months up to one year. Fixed term deposits with terms of more  
than one year are recognised in the “other financial assets”. They are measured at amortised  
costs under the category “Financial Assets at Amortised Cost (AC)”. This item also recognises  
investments in money market funds that are allocated to the category “Financial Assets at  
Fair Value through Profit or Loss (FVPL)”.  
5.11.  
Cash and cash equivalents  
The item “Cash and cash equivalents” includes cash in hand, deposits at banks with an  
original maturity of up to three months, provided that they are not subject to limitations on  
availability, and investments in short-term bonds that are readily convertible to a fixed  
amount of cash and which are only subject to an insignificant risk of changes in value. They  
are measured at amortised costs under the category “Financial Assets at Amortised Cost  
(AC)”.  
5.12.  
Financial instruments  
Purchases and sales of primary financial instruments are recognised at the settlement date.  
Purchases and sales of derivative financial instruments are recognised at the trade date.  
Measurement of the financial instruments is done at the time of acquisition, always at fair  
value under consideration of the transaction costs (except for the financial instruments of the  
FVPL category). Financial instruments are derecognised when the rights to payments from the  
investment have lapsed or been assigned and once the Group has relinquished all substantial  
risks and rewards of ownership.  
5.12.1.  
Primary financial instruments  
Energie AG Group used the categories “Financial Assets at Amortized Cost (AC)”, “Financial  
Assets at Fair Value through Other Comprehensive Income (FVOCI)”, “Financial Assets at Fair  
Value through Profit or Loss (FVPL)”, “Financial Liabilities at Amortized Cost (FLAC)” and  
“Financial Liabilities at Fair Value through Profit or Loss (FVPL)”.  
Financial assets held as part of a business model that pursues the objective of holding  
financial assets for the purpose of collecting the contractual payment streams with  
contractual terms that result in payment streams on fixed dates and exclusively representing  
repayments and interest payments are classified as “Financial Assets at Amortised Cost (AC)”.  
The initial recognition is measured at fair value plus transaction costs, subsequent  
measurement is made at amortised costs.  
An impairment in the amount of the expected credit loss over the term is recognised for  
financial assets measured at amortised costs (AC) whose default risk has significantly  
increased since their first-time recognition, as well as for trade receivables. An allowance for  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
171  
Consolidated Financial Statements Notes  
accounts receivable is, differently to what was explained above, recognised in the amount of  
the expected credit losses over the full term. If the term is less than 12 months, the  
impairment is determined on the basis of the shorter term.  
The category “Financial Assets at Amortised Cost (AC)” essentially comprises lendings, trade  
receivables, receivables from joint arrangements and associated companies, other financial  
receivables, fixed term deposits as well as cash and cash equivalents.  
For certain financial investments in equity instruments that would otherwise be measured at  
their fair value through profit or loss, the irrevocable choice was made to recognise the  
changes to the fair value resulting from their remeasurement in the other comprehensive  
income (“Financial Assets at Fair Value through Other Comprehensive Income (FVOCI)”). This  
category is essentially comprised of other investments and securities (shares). Their fair value  
is, where available, determined on the basis of stock exchange prices, or otherwise by  
measurement of internally or externally available measurement parameters.  
Derivatives without a hedging relationship are recognised in the categories “Financial Assets  
at Fair Value through Profit or Loss (FVPL)” or “Financial Liabilities at Fair Value through Profit  
or Loss (FVPL)”.  
Certain securities (units in investment funds) and money market funds recognised in the item  
“Fixed term deposits and short-term investments” are allocated to the category “Financial  
Assets at Fair Value through Profit or Loss (FVPL)”. Their fair values are derived from current  
market prices.  
Financial liabilities that are not attributable to leases, trade payables, liabilities to affiliated  
companies, joint arrangements as well as associated companies and other financial liabilities  
are allocated to the category “Financial Liabilities at Cost (FLAC)” and measured at amortised  
costs calculated on the basis of the effective interest method. The initial recognition is  
measured at fair value plus transaction costs. Premiums, discounts or other costs of issue are  
distributed across the financing term and disclosed in the financial result.  
5.12.2.  
Derivative financial instruments and hedging transactions  
In the Group, derivative financial instruments are used above all to hedge the risks of  
fluctuations in interest rates and electricity, gas and CO2 prices.  
The requirements for hedge accounting according to IFRS 9 specifically include  
documentation of the hedging relationship, the hedging strategy and the ongoing  
assessment of effectiveness. According to IFRS 9, the hedging relationship is effective if there  
is a commercial relationship between the hedged item and the hedging transaction, the  
effects of the credit risk have no dominant impact on the change in value resulting from the  
commercial relationship and the hedging quota from the volume of the actually hedged item  
corresponds to the volume of the hedging transaction that is actually used for hedging  
purposes. All components of changes in fair value of derivatives are included in effectivity  
assessment.  
If a derivative financial instrument pursuant to IFRS 9 is used for hedge accounting in a cash  
flow hedge, the effective portion of the gain or loss on the hedging instrument’s fair value is  
recognised in equity in other comprehensive income. This is reclassified in the Statement of  
Income in the same period in which the cash flows of the hedged item are recognised in  
profit or loss. If the hedged item ceases to exist, the hedging result is recognised in the  
Statement of Income. The ineffective portion of the change in fair value of a hedging  
instrument for which a cash flow hedge has been created is recognised through profit or loss  
to the extent required.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
172  
Consolidated Financial Statements Notes  
In fair value hedge accounting, both the fair value change of the derivative, and the  
corresponding fair value change of the hedged item, as far as it is attributable to the hedged  
risk, are recognised through profit or loss.  
Changes in fair value of derivatives not designated as hedging instruments are recognised in  
the operating result. The balanced net results from derivative energy instruments are  
recognised under sales revenues.  
Contracts that were entered into and that continue to be held for the receipt or delivery of  
non-financial items in accordance with expected purchase, sale or usage requirements are not  
recognised as derivative financial instruments at fair value according to IFRS 9, but rather as  
executory contracts according to the regulations of IAS 37.  
5.13.  
Provisions under IAS 19  
Provisions for pensions, severance, stepped pension/early retirement benefits and anniversary  
bonuses are calculated according to the projected unit credit method in accordance with  
IAS 19 (Employee Benefits). Expected increases in wages, salaries and pensions are taken into  
account. Actuarial gains and losses for pension and severance provisions are recognised in  
other comprehensive income, and they are recognised through profit or loss for anniversary  
bonus, stepped pension and early retirement provisions. Interest costs are recognised in the  
financial result.  
5.14.  
Other provisions  
Other provisions include all recognisable obligations as of the reporting date that are based  
on past events and for which the amount or maturity is uncertain. Provisions are recognised  
at the amount that is most likely to be incurred. Discounted costs for obligations resulting  
from dismantling and removing property, plant and equipment assets and restoring the site  
are estimated, capitalised at the date the plant is added, and recognised as a provision.  
5.15.  
Deferred taxes  
Deferred tax liabilities are recognised for all temporary differences between the amounts  
recognised in the Consolidated Statement of Financial Position and the amounts recognised  
in the tax balance sheets of the individual Group companies. Future tax benefits resulting  
from tax losses that are carried forward are also taken into account. Values are adjusted if it is  
no longer probable that they can be offset.  
5.16.  
Construction cost subsidies  
This item primarily includes contributions received from electricity, gas and district heating  
customers for connecting them to the grid. Construction cost subsidies carried as liabilities  
are reversed as sales revenues in accordance with the depreciation and impairments for the  
corresponding asset.  
5.17.  
Investment subsidies  
Government grants for asset acquisition are recognised as investment subsidies liabilities and  
reversed in other operating income in accordance with the asset’s useful life.  
5.18.  
Contingent liabilities  
Contingent liabilities are potential or existing obligations (resulting from past events) for  
which an outflow of resources is not probable. There are no material contingent liabilities.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
173  
Consolidated Financial Statements Notes  
5.19.  
Foreign currency translations  
Foreign currency translation is carried out according to the functional currency principle. The  
functional currency for all consolidated entities is the respective national currency.  
Accordingly, items of the Statement of Financial Position are translated at the mean exchange  
rate on the reporting date, and items of the Statement of Income are translated at the mean  
exchange rate for the statement period. Differences from translating the pro-rata equity are  
recognised in other comprehensive income. Differences from currency translation of minority  
interests are recognised under the item “non-controlling interest in equity”. The exchange  
rate applied on 30 September 2022 for the Czech koruna was 24.56725 (previous year:  
25.42595), for the Hungarian forint 421.84750 (previous year: 359.921), for the US dollar  
0.97984 (previous year: 1.15896).  
5.20.  
Revenues from customer contracts  
Revenues are recognised at the time a customer gains the authority to dispose over the goods  
or services. The sales revenues correspond to the revenues presented in the segment  
reporting. There are no significant obligations to accept returns or grant refunds, guarantees  
and/or discretionary decisions.  
Sales revenues in the Energy Segment and the Grid Segment  
Written contracts are in place with electricity and gas customers and/or electricity grid and  
gas grid customers.  
These result in performance obligations for the delivery of electricity and natural gas, as well  
as obligations from the operation of the electricity and gas grid for the Group.  
These performance obligations are satisfied within the relevant periods. Electricity and gas  
customers as well as electricity grid and gas grid customers with monthly volume metering  
are invoiced on a monthly basis. Payment is usually received within one month from the  
invoice date. Where no monthly volume metering takes place, the customers usually pay  
monthly instalments.  
The transaction price is determined on the basis of the concluded electricity and gas supply  
contracts, or the grid utilisation fees for the grid utilisation period. In the case of multi-  
component contracts, the consideration payable is allocated to the performance obligations  
on the basis of the contractually agreed prices for the individual performance obligations. This  
essentially concerns energy supplies, balancing energy and other services.  
Sales revenues are recognised within the period in which electricity or natural gas deliveries  
take place or the grid is utilised.  
Sales revenues include revenues from proprietary trading of electricity and gas. Net sales  
revenues (after deducting procurement costs for proprietary electricity and gas trading)  
include the realised margin. Procurement costs for proprietary energy and gas trading pertain  
to quantities of electricity and gas that have been purchased solely for the purpose of  
reselling at the wholesale level while achieving an appropriate margin.  
Sales revenues in the Waste Management Segment  
The revenues from the collection of waste concern the collection and intake of refuse. These  
performance obligations are, to the largest extent, satisfied at a certain point in time. The  
transaction price is determined on the basis of the contracts concluded. Multi-component  
contracts usually provide for the consideration payable to be allocated to the performance  
obligations.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
174  
Consolidated Financial Statements Notes  
Waste recycling includes the incineration of waste. Written contracts are in place with  
customers purchasing the generated heat and/or electricity. The performance obligations –  
the supply of heat and electricity – are satisfied within the relevant period. The transaction  
price is provided for in the contracts.  
Additional revenues are generated from the sale of recycling materials (plastics, metals,  
timber). The performance obligation is satisfied at the time of the transfer to the customer.  
Sales revenues are recognised within the period in which the collection and/or intake of the  
waste takes place, in which the generated heat or electricity is delivered, or in which the  
recycled materials are delivered. Payment terms in the Waste Management Segment are  
usually one month from the invoice date.  
Sales revenues in the Czech Republic Segment  
Sales revenues in the Czech Republic Segment predominantly result from water deliveries,  
intake of waste water and services related to water/waste water and heat supplies in the  
Czech Republic. These performance obligations are, to the largest extent, satisfied within the  
relevant periods. The transaction price is provided for in the contracts.  
Sales revenues are recognised in the period in which the delivery of water or intake of waste  
water takes place, the customer obtains the benefit from the services, or the heat is delivered.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
175  
Notes to the Statement of Income  
NOTES TO THE STATEMENT OF INCOME  
6.  
Sales revenues  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Energy Segment  
Revenues from electricity sales  
2,205,344.0  
935,436.1  
Revenues from natural gas sales  
780,294.8  
287,055.1  
Revenues from district heat sales  
91,327.2  
56,032.8  
Others  
55,892.1  
60,471.4  
3,132,858.1  
1,338,995.4  
Grid Segment  
Revenues from the electricity and gas grids  
342,984.8  
334,752.4  
Revenues from the reversal of construction cost subsidies  
28,442.4  
27,118.5  
Others  
7,314.3  
4,223.2  
378,741.5  
366,094.1  
Waste Management Segment  
Revenues from the collection of waste  
109,354.1  
104,495.5  
Revenues from the recycling of waste  
81,990.2  
83,085.6  
Revenues from the processing of waste  
62,280.2  
50,040.7  
Others  
10,015.4  
9,403.1  
263,639.9  
247,024.9  
Czech Republic Segment  
Revenues from water deliveries  
80,169.0  
73,473.4  
Revenues from waste water intake  
69,798.5  
63,811.8  
Revenues from district heat sales  
20,261.6  
13,980.3  
Others  
24,468.9  
21,801.0  
194,698.0  
173,066.5  
Holding & Services Segment  
32,152.8  
19,982.6  
Sales revenues  
4,002,090.3  
2,145,163.5  
Procurement costs for proprietary electricity trading  
-193,860.1  
-118,964.6  
Net sales revenues  
3,808,230.2  
2,026,198.9  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
176  
Consolidated Financial Statements Notes  
7.  
Segment reporting  
Segment reporting by business units  
Energie AG Group identifies the reportable segments according to IFRS 8 on the basis of  
internal reporting and internal control (Management Approach).  
The segment reporting includes the Energy, Grid, Waste Management, and Czech Republic  
and Holding & Services Segments.  
The accounting policies applied to the reported segments are the same as those applied  
throughout the Group. The operating result is the net profit or loss for the period that is  
monitored regularly by the chief decision-makers and used as the primary basis for assessing  
success and allocating resources.  
The sales transactions carried out between the Grid Segment and the other segments  
primarily involve grid services for which the prices are based on regulatory stipulations. Intra-  
Group sales revenues in the Holding & Services Segment primarily involve delivery of goods  
and services that are charged at prices corresponding to market conditions.  
Capital employed is the key figure relating to assets and liabilities in the Group that are  
reported to the chief operating decision makers on a regular basis. Capital employed includes  
above all equity and interest-bearing liabilities, including lease liabilities, less cash and cash  
equivalents, fixed term deposits, and certain financial assets.  
Energy  
The Energy Segment figures include the production, trade and sales of electrical energy.  
Electricity is primarily generated using hydraulic and thermal power generation plants. In  
addition, electricity is also obtained from third-party power plants via procurement rights, as  
well as on the electricity market. The Energy Segment includes Energie AG Oberösterreich  
Trading GmbH as a central electricity and gas trading company, as well as the 7-Fields gas  
reservoir. The trade with and distribution of natural gas, the heating business unit, as well as  
Bioenergie Steyr GmbH, Fernwärme Steyr GmbH, Windpower EP GmbH, Geothermie-  
Wärmegesellschaft Braunau-Simbach mbH, Geothermie-Fördergesellschaft Simbach-Braunau  
mbH and Energie Ried Wärme GmbH, all measured using the equity method, are allocated to  
the Energy Segment.  
Grid  
The Grid Segment includes the construction and operation of the electricity and gas grids.  
Waste Management  
The Waste Management Segment primarily includes the acceptance, sorting, incineration and  
landfilling of domestic and industrial waste. “Papyrus” Altpapierservice  
Handelsgesellschaft m.b.H. (measured using the equity method), Papyrus Wertstoff  
Service GmbH and Austrian Metal Recovery GmbH are allocated to the Waste Management  
Segment.  
Czech Republic  
The Czech Republic Segment primarily includes supplying drinking water, as well as waste  
water management and the heat activities in the Czech Republic.  
Holding & Services  
The Holding & Services Segment comprises the management and control functions of the  
segment, commercial and technical services, Energie AG Oberösterreich Telekom GmbH, as  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
177  
Consolidated Financial Statements Notes  
well as the investments in Salzburg AG für Energie, Verkehr und Telekommunikation, Wels  
Strom GmbH, BBOÖ Breitband Oberösterreich GmbH and Breitband Oberösterreich  
Infrastruktur GmbH, all recognised at equity.  
Segment reporting by business units is as follows:  
Reconcili-  
Waste  
ation/  
Manage-  
Czech  
Holding &  
eli-  
Energy  
Grid  
ment  
Republic  
Services  
mination  
Group  
2021/2022  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
Sales to third parties  
3,132.9  
378.7  
263.6  
194.7  
32.2  
4,002.1  
Intersegment sales  
6.3  
13.3  
9.0  
-
225.9  
-254.5  
-
Total sales  
3,139.2  
392.0  
272.6  
194.7  
258.1  
-254.5  
4,002.1  
Results from investments in  
equity companies  
5.4  
-
0.4  
-
17.9  
-
23.7  
Depreciation, amortisation and  
impairments  
-28.8  
-95.0  
-21.2  
-8.3  
-12.3  
-
-165.6  
Thereof impairments  
-1.0  
-
-
-
-
-
-1.0  
Operating result  
18.8  
45.3  
33.9  
6.0  
46.6  
-
150.6  
Carrying amount of investments  
in equity companies  
16.5  
-
5.2  
-
265.4  
-
287.1  
Goodwill  
21.1  
-
45.3  
23.2  
0.1  
-
89.7  
Investments in intangible assets  
and property, plant and  
equipment  
24.5  
115.4  
19.7  
8.0  
33.6  
-
201.2  
Capital employed  
-242.7  
759.4  
213.0  
100.2  
212.1  
-
1,042.0  
EUR mill.  
Capital employed  
1,042.0  
Assets not used in the service production and sales process  
1,596.6  
Non-interest bearing liabilities, provisions  
4,274.1  
Balance sheet total  
6,912.7  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
178  
Consolidated Financial Statements Notes  
The operational unit “Metering” was transferred from Energie AG Oberösterreich  
Telekom GmbH (Holding & Services Segment) to Netz Oberösterreich GmbH (Grid Segment)  
in the 2021/2022 fiscal year. Segment reporting in 2021/2022 by the old segment structure is  
as follows:  
Reconcili-  
Waste  
ation/  
Manage-  
Czech  
Holding &  
eli-  
Energy  
Grid  
ment  
Republic  
Services  
mination  
Group  
2021/2022  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
Sales to third parties  
3,132.9  
378.6  
263.6  
194.7  
32.3  
4,002.1  
Intersegment sales  
6.3  
13.2  
9.0  
-
252.2  
-280.7  
-
Total sales  
3,139.2  
391.8  
272.6  
194.7  
284.5  
-280.7  
4,002.1  
Results from investments in  
equity companies  
5.4  
-
0.4  
-
17.9  
-
23.7  
Depreciation, amortisation and  
impairments  
-28.8  
-77.6  
-21.2  
-8.3  
-29.7  
-
-165.6  
Thereof impairments  
-1.0  
-
-
-
-
-
-1.0  
Operating result  
18.8  
39.0  
33.9  
6.0  
52.9  
-
150.6  
Carrying amount of investments  
in equity companies  
16.5  
-
5.2  
-
265.4  
-
287.1  
Goodwill  
21.1  
-
45.3  
23.2  
0.1  
-
89.7  
Investments in intangible assets  
and property, plant and  
equipment  
24.5  
108.3  
19.7  
8.0  
40.7  
-
201.2  
Capital employed  
-242.7  
632.6  
213.0  
100.2  
338.9  
-
1,042.0  
EUR mill.  
Capital employed  
1,042.0  
Assets not used in the service production and sales process  
1,596.6  
Non-interest bearing liabilities, provisions  
4,274.1  
Balance sheet total  
6,912.7  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
179  
Consolidated Financial Statements Notes  
The segment information 2020/2021 broken down by business unit presents as follows:  
Reconcili-  
Waste  
ation/  
Manage-  
Czech  
Holding &  
eli-  
Energy  
Grid  
ment  
Republic  
Services  
mination  
Group  
2020/2021  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
Sales to third parties  
1,339.0  
366.1  
247.0  
173.1  
20.0  
-
2,145.2  
Intersegment sales  
7.1  
14.8  
9.2  
0.1  
254.7  
-285.9  
-
Total sales  
1,346.1  
380.9  
256.2  
173.2  
274.7  
-285.9  
2,145.2  
Results from investments in  
equity companies  
2.3  
-
0.7  
-
26.2  
-
29.2  
Depreciation, amortisation and  
impairments  
-27.1  
-74.5  
-20.4  
-7.7  
-34.7  
-
-164.4  
Thereof impairments  
-0.5  
-
-
-
-0.2  
-
-0.7  
Operating result  
82.4  
37.2  
29.6  
11.1  
28.1  
-
188.4  
Carrying amount of investments  
in equity companies  
12.7  
-
5.0  
-
216.2  
-
233.9  
Goodwill  
21.1  
-
45.3  
20.8  
0.1  
-
87.3  
Investments in intangible assets  
and property, plant and  
equipment  
25.2  
103.6  
28.9  
9.1  
48.3  
-
215.1  
Capital employed  
473.3  
684.5  
213.3  
93.4  
335.4  
-
1,799.9  
EUR mill.  
Capital employed  
1,799.9  
Assets not used in the service production and sales process  
652.3  
Non-interest bearing liabilities, provisions  
1,423.2  
Balance sheet total  
3,875.4  
Reversals of impairment concern the Energy Segment with EUR 4.1 million (previous year:  
EUR 7.2 million), and the Waste Management Segment with EUR 0.0 million (previous year:  
EUR 4.7 million). Non-cash items in connection with derivatives in the amount of  
EUR 385.5 million (previous year: EUR -45.2 million) pertain to the Energy Segment. The  
income from the reversal of construction cost subsidies attributable to the Grid Segment  
amounted to EUR 28.4 million (previous year: EUR 27.1 million). Non-cash income from  
companies valued using the equity method amounting to EUR 7.4 million (previous year:  
EUR 19.4 million) and income from the disposal of the “Fiber to the Home” operational unit  
amounting to EUR 37.0 million (see section 32 › Page 232) relate to the Holding & Services  
Segment.  
Segment reporting broken down by geographic segments  
Energie AG Oberösterreich Group operates primarily in the regions “Austria” and “Czech  
Republic”. Business operations in other countries (Italy, Germany, Hungary, Poland) are  
combined in the geographical segment “Other countries”.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
180  
Consolidated Financial Statements Notes  
Austria  
Czech Republic  
Other countries  
Group  
2021/2022  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
Sales to third parties  
3,795.4  
194.7  
12.0  
4,002.1  
Capital employed  
927.5  
100.3  
14.2  
1,042.0  
Austria  
Czech Republic  
Other countries  
Group  
2020/2021  
EUR mill.  
EUR mill.  
EUR mill.  
EUR mill.  
Sales to third parties  
1,961.0  
173.3  
10.9  
2,145.2  
Capital employed  
1,690.8  
93.6  
15.5  
1,799.9  
Revenues from electricity trading with customers outside Austria amounting to  
EUR 526.6 million (previous year: EUR 361.5 million) were also generated.  
8.  
Other operating revenues  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Income from the disposal of intangible assets and property, plant and equipment  
37,874.6  
2,183.4  
Reversals of impairment  
4,107.2  
11,880.6  
Capitalised production costs  
649.1  
546.0  
Rental and lease income  
3,284.5  
2,917.5  
Income from the reversal of investment subsidies  
2,667.1  
3,350.3  
Income from CO2 emissions allowances  
2,393.0  
2,654.5  
Insurance income  
858.5  
1,101.9  
Other income  
13,147.4  
8,476.0  
64,981.4  
33,110.2  
9.  
Expenses for material and other purchased services  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Electricity purchased from third parties  
1,860,414.5  
736,239.9  
Gas purchases  
768,142.7  
312,222.0  
Gas input  
292,473.2  
45,322.7  
Expenses for grid purchases  
100,835.7  
95,575.7  
Other purchased goods  
152,056.3  
84,913.3  
Expenses for purchased services  
134,100.0  
137,475.5  
3,308,022.4  
1,411,749.1  
Procurement costs for proprietary electricity trading  
-193,860.1  
-118,964.6  
3,114,162.3  
1,292,784.5  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
181  
Consolidated Financial Statements Notes  
10.  
Personnel expenses  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Wages and salaries  
242,021.9  
235,192.1  
Severance payments and contributions to company pension funds  
4,095.5  
5,989.2  
Pension payments  
6,106.4  
5,291.5  
Expenses for statutory social security contributions and payroll-related levies and statutory  
contributions  
62,178.9  
59,921.8  
Other benefit expenses  
3,951.9  
2,026.0  
318,354.6  
308,420.6  
The expenses for defined contribution plans amounted to EUR 7,191.5 thousand (previous  
year: EUR 6,985.2 thousand). Expenses for severance payments of EUR 9.3 thousand  
(previous year: EUR 8.9 thousand), as well as expenses for pension payments of  
EUR 188.6 thousand (previous year: EUR 215.3 thousand), pertain to members of the  
Management Board.  
The remunerations of the Management Board and of the Supervisory Board of Energie AG  
Oberösterreich are as follows:  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Management Board  
846.1  
826.9  
Former Management Board and their survivors  
705.1  
694.9  
Supervisory Board  
95.4  
93.5  
1,646.6  
1,615.3  
The average number of employees in this fiscal year amounts to 4,606 (previous year: 4,593).  
Part-time employees are included on a proportional basis.  
11.  
Depreciation, amortisation and impairments  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Depreciation and amortisation  
164,603.5  
163,702.8  
Impairments  
993.9  
723.0  
165,597.4  
164,425.8  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
182  
Consolidated Financial Statements Notes  
12.  
Other operating expenses  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Taxes  
7,837.2  
7,862.9  
External services  
67,826.7  
51,510.5  
Travel expenses  
8,498.3  
7,693.9  
Insurance premiums  
9,175.5  
7,278.5  
Postage and telecommunication  
6,073.2  
5,995.0  
Rental and leasing expenses  
1,746.8  
1,683.1  
Write-offs of receivables  
1,381.7  
1,589.8  
Allocation of allowances and expected losses to receivables  
897.6  
737.0  
Vehicle expense  
18,783.5  
17,404.6  
Losses from the disposal of intangible assets and property, plant and equipment  
2,048.7  
1,540.8  
Repairs  
27,608.4  
29,798.4  
Other expenses  
40,635.2  
46,800.2  
192,512.8  
179,894.7  
Taxes mainly include property tax, dumpsite levy and electricity levy, as well as the Austrian  
landfill tax. The expenses incurred for the Group auditor, Deloitte Audit  
Wirtschaftsprüfungs GmbH, for auditing services and other accounting services provided to  
the entities of the Energie AG Oberösterreich Group amount to EUR 540.5 thousand  
(previous year: EUR 519.8 thousand). In addition, the Group auditor provided other  
consulting services for the Energie AG Oberösterreich Group totalling EUR 88.5 thousand  
(previous year: EUR 19.0 thousand).  
Other expenses primarily include allocations to provisions, transaction costs, marketing  
expenses and fees.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
183  
Consolidated Financial Statements Notes  
13.  
Interest income  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Financing expenses  
Interest and similar expenses  
-24,169.0  
-21,180.1  
Interest expense on personnel provisions  
-1,895.1  
-2,439.7  
Interest expense on lease liabilities  
-727.1  
-516.9  
Foreign exchange losses  
-1,150.9  
-29.3  
-27,942.1  
-24,166.0  
Other interest income  
Interest and similar income  
999.4  
841.9  
Interest income from lease liabilities  
135.9  
235.3  
Foreign exchange gains  
0.8  
95.2  
Measurement of interest rate derivatives  
95.1  
-95.1  
1,231.2  
1,077.3  
-26,710.9  
-23,088.7  
14.  
Other financial result  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Result from investments  
Non-consolidated affiliated companies  
100.0  
100.0  
Income from other investments  
2,507.0  
1,824.3  
2,607.0  
1,924.3  
Result from financial investments  
Losses from the measurement of lendings  
-33.8  
-6.5  
Gains from the measurement of lendings  
7.0  
10.7  
Income from securities  
652.5  
367.0  
Losses from the measurement of securities  
-4,858.1  
-
Gains from the measurement of securities  
-
641.1  
Gains from the disposal of securities  
194.6  
243.6  
Losses from the measurement of fixed term deposits  
-
-113.0  
Gains from the measurement of fixed term deposits  
205.3  
-
Losses from the measurement of investment funds  
-624.8  
-89.4  
Income from the measurement of investment funds  
29.6  
16.7  
Result hedging transaction financial investment  
-195.4  
-40.0  
-4,623.1  
1,030.2  
-2,016.1  
2,954.5  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
184  
Consolidated Financial Statements Notes  
15.  
Income taxes  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Current income taxes  
5,858.6  
33,418.4  
Adjustment for deferred taxes  
4,830.1  
2,991.9  
10,688.7  
36,410.3  
Expenses for taxes on income are EUR 19,444.6 thousand lower (previous year:  
EUR 4,987.6 thousand lower) than the calculated expenses for taxes on income that result  
from applying the respective tax rates to the earnings before taxes on income. The reasons  
for the difference between the calculated and reported income tax expenses are as follows:  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Earnings before income taxes  
121,909.7  
168,269.2  
Imputed tax expenses  
30,133.3  
41,397.9  
Tax effects from  
Tax-free earnings from companies measured at equity and tax-free investment income  
-4,821.6  
-4,410.9  
Tax-free profits from reorganisation measures (32)  
-9,260.4  
-
Impact of the eco-social tax reform on deferred taxes  
-5,206.8  
-
Other items  
-155.8  
-576.7  
Effective tax income/expenses  
10,688.7  
36,410.3  
Effective tax rate in %  
8.8  
21.6  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
185  
Consolidated Financial Statements Notes  
Temporary differences between the amounts recognised in the Consolidated Financial  
Statements and the respective taxable amounts have the following effects on the reported  
deferred taxes:  
Assets  
Liabilities  
Net  
2022  
2021  
2022  
2021  
2022  
2021  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Intangible assets  
-
-
-19,691.1  
-22,900.3  
-19,691.1  
-22,900.3  
Property, plant and equipment  
7,811.9  
9,650.5  
-47,605.9  
-40,139.6  
-39,794.0  
-30,489.1  
Financial assets  
3,295.0  
3,830.5  
-7,539.6  
-6,696.9  
-4,244.6  
-2,866.4  
Provisions  
28,456.1  
43,282.5  
-1,273.5  
-1,456.7  
27,182.6  
41,825.8  
Untaxed reserves  
-
-
-12,376.1  
-14,037.1  
-12,376.1  
-14,037.1  
Construction cost subsidies  
284.0  
17.4  
-1,739.3  
-1,896.3  
-1,455.3  
-1,878.9  
Cash flow hedge reserve  
-
2,186.5  
-79,900.0  
-32,690.5  
-79,900.0  
-30,504.0  
Leasing  
17,214.7  
17,064.3  
-17,137.0  
-17,835.7  
77.7  
-771.4  
Outstanding write-downs to fair value  
-
180.1  
-
-
-
180.1  
Current derivative financial instruments  
239,654.6  
62,006.9  
-320,236.3  
-61,462.9  
-80,581.7  
544.0  
Non-current derivative financial instruments  
243,482.9  
17,423.0  
-162,298.2  
-18,693.1  
81,184.7  
-1,270.1  
Other  
6,998.2  
6,945.1  
-1,117.7  
-748.3  
5,880.5  
6,196.8  
Deferred tax assets/  
liabilities before offsetting  
547,197.4  
162,586.8  
-670,914.7  
-218,557.4  
-123,717.3  
-55,970.6  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
186  
Consolidated Financial Statements Notes  
Balance  
Recognised  
Balance  
as of  
Disposal  
Exchange  
Recognised  
in profit or  
as of  
30.09.2022  
group IFRS 5  
differences  
in equity  
loss  
01.10.2021  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Intangible assets  
-19,691.1  
-
-43.1  
-
3,252.3  
-22,900.3  
Property, plant  
and equipment  
-39,794.0  
-
-152.5  
-
-9,152.4  
-30,489.1  
Financial assets  
-4,244.6  
-
-
-924.5  
-453.7  
-2,866.4  
Provisions  
27,182.6  
-
32.5  
-12,317.9  
-2,357.8  
41,825.8  
Untaxed reserves  
-12,376.1  
-
-
-
1,661.0  
-14,037.1  
Construction cost  
subsidies  
-1,455.3  
-
-
-
423.6  
-1,878.9  
Cash flow hedge  
reserve  
-79,900.0  
-
-
-49,396.0  
-
-30,504.0  
Leasing  
77.7  
-
-
-
849.1  
-771.4  
Outstanding  
write-downs to  
fair value  
-
-
-
-
-180.1  
180.1  
Current  
derivative  
financial  
instruments  
-80,581.7  
-
-
-
-81,125.7  
544.0  
Non-current  
derivative  
financial  
instruments  
81,184.7  
-
-
-
82,454.8  
-1,270.1  
Other  
5,880.5  
-
-115.1  
-
-201.2  
6,196.8  
-123,717.3  
-
-278.2  
-62,638.4  
-4,830.1  
-55,970.6  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
187  
Consolidated Financial Statements Notes  
Balance  
Recognised  
Balance  
as of  
Disposal  
Exchange  
Recognised  
in profit or  
as of  
30.09.2021  
group IFRS 5  
differences  
in equity  
loss  
01.10.2020  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Intangible assets  
-22,900.3  
-
-68.6  
-
111.0  
-22,942.7  
Property, plant  
and equipment  
-30,489.1  
2,634.2  
-284.6  
-
-9,308.3  
-23,530.4  
Financial assets  
-2,866.4  
-
-
-1,428.2  
1,169.1  
-2,607.3  
Provisions  
41,825.8  
-
61.5  
898.3  
7,047.9  
33,818.1  
Untaxed reserves  
-14,037.1  
-
-
-
637.4  
-14,674.5  
Construction cost  
subsidies  
-1,878.9  
-
-
-
-1,746.9  
-132.0  
Cash flow hedge  
reserve  
-30,504.0  
-
-
-35,688.6  
-
5,184.6  
Leasing  
-771.4  
-
-
-
-866.5  
95.1  
Outstanding  
write-downs to  
fair value  
180.1  
-
-
-
-180.0  
360.1  
Current  
derivative  
financial  
instruments  
544.0  
-
-
-
318.8  
225.2  
Non-current  
derivative  
financial  
instruments  
-1,270.1  
-
-
-
-1,218.4  
-51.7  
Other  
6,196.8  
-39.0  
-9.4  
-
1,044.0  
5,201.2  
-55,970.6  
2,595.2  
-301.1  
-36,218.5  
-2,991.9  
-19,054.3  
No deferred tax liabilities were recognised for temporary differences of  
EUR 922,656.1 thousand (previous year: EUR 643,621.4 thousand) in connection with fully  
consolidated subsidiaries, joint ventures and associated companies. Deferred taxes in the  
amount of EUR -924.5 thousand (previous year: EUR -1,428.2 thousand) pertain to changes  
in value of investments and securities FVOCI recognised outside of profit or loss; deferred  
taxes in the amount of EUR -49,396.0 thousand (previous year: EUR -35,688.6 thousand)  
pertain to changes in value from hedge accounting recognised outside of profit or loss.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
188  
Notes to the Statement of Financial Position  
NOTES TO THE STATEMENT OF FINANCIAL POSITION  
16.  
Intangible assets and property, plant and equipment  
Changes in intangible assets and goodwill  
Electricity  
Assets  
procurement  
Customer  
under  
rights  
Other rights  
Goodwill  
base  
construction  
Total  
2021/2022  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Costs  
01.10.2021  
254,900.4  
118,165.1  
98,339.8  
77,568.7  
74.7  
549,048.7  
Translation  
differences  
-
162.4  
740.0  
857.3  
3.9  
1,763.6  
Change in the  
scope of  
consolidation  
-
9.7  
1,668.6  
1,278.8  
-
2,957.1  
Additions  
1,689.3  
6,329.5  
-
-
557.8  
8,576.6  
Disposals  
-
-1,067.1  
-
-8,831.8  
-
-9,898.9  
Transfers  
-
430.4  
-
-
-430.4  
-
30.09.2022  
256,589.7  
124,030.0  
100,748.4  
70,873.0  
206.0  
552,447.1  
Accumulated  
amortisation  
01.10.2021  
171,169.2  
100,337.1  
11,022.9  
33,397.7  
-
315,926.9  
Translation  
differences  
-
144.4  
-
588.3  
-
732.7  
Amortisation  
1,307.3  
4,029.3  
-
4,371.1  
-
9,707.7  
Disposals  
-
-986.3  
-
-8,831.8  
-
-9,818.1  
30.09.2022  
172,476.5  
103,524.5  
11,022.9  
29,525.3  
-
316,549.2  
Carrying amount  
as of 01.10.2021  
83,731.2  
17,828.0  
87,316.9  
44,171.0  
74.7  
233,121.8  
Carrying  
amount as of  
30.09.2022  
84,113.2  
20,505.5  
89,725.5  
41,347.7  
206.0  
235,897.9  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
189  
Consolidated Financial Statements Notes  
Electricity  
Assets  
procurement  
Customer  
under  
rights  
Other rights  
Goodwill  
base  
construction  
Total  
2020/2021  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Costs  
01.10.2020  
251,950.2  
116,571.4  
97,240.1  
84,862.0  
156.4  
550,780.1  
Change in the  
scope of  
consolidation  
-
275.1  
1,321.6  
1,547.7  
8.7  
3,153.1  
Translation  
differences  
2,950.2  
2,833.7  
-
-
201.7  
5,985.6  
Additions  
-
-1,204.0  
-221.9  
-8,841.0  
-5.1  
-10,272.0  
Disposals  
-
-598.1  
-
-
-
-598.1  
Transfers  
-
287.0  
-
-
-287.0  
-
30.09.2021  
254,900.4  
118,165.1  
98,339.8  
77,568.7  
74.7  
549,048.7  
Accumulated  
amortisation  
and  
impairments  
01.10.2020  
169,935.2  
97,361.7  
11,022.9  
36,884.3  
-
315,204.1  
Translation  
differences  
-
249.7  
-
1,024.2  
-
1,273.9  
Amortisation  
1,234.0  
4,340.4  
-
4,330.2  
-
9,904.6  
Disposals  
-
-1,187.6  
-
-8,841.0  
-
-10,028.6  
Disposal group  
IFRS 5  
-
-427.1  
-
-
-
-427.1  
30.09.2021  
171,169.2  
100,337.1  
11,022.9  
33,397.7  
-
315,926.9  
Carrying amount  
as of 01.10.2020  
82,015.0  
19,209.7  
86,217.2  
47,977.7  
156.4  
235,576.0  
Carrying  
amount as of  
30.09.2021  
83,731.2  
17,828.0  
87,316.9  
44,171.0  
74.7  
233,121.8  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
190  
Consolidated Financial Statements Notes  
Changes in property, plant and equipment  
Manufacturing  
Assets  
Land and  
plant and  
Furniture  
under  
buildings  
equipment  
and fixtures  
construction  
Total  
2021/2022  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Costs  
01.10.2021  
1,198,297.6  
4,115,592.4  
234,491.6  
111,086.9  
5,659,468.5  
Translation differences  
3,329.3  
1,780.2  
608.9  
209.6  
5,928.0  
Change in the scope of consolidation  
741.7  
261.3  
14.9  
-
1,017.9  
Additions  
9,430.3  
108,542.8  
13,924.3  
60,739.2  
192,636.6  
Disposals  
-2,645.4  
-16,010.4  
-6,995.0  
-501.1  
-26,151.9  
Transfers  
15,629.9  
67,920.4  
2,989.0  
-86,539.3  
-
30.09.2022  
1,224,783.4  
4,278,086.7  
245,033.7  
84,995.3  
5,832,899.1  
Accumulated depreciation and  
impairments  
01.10.2021  
668,204.0  
2,854,219.2  
188,002.5  
-336.5  
3,710,089.2  
Translation differences  
1,521.7  
1,211.2  
444.6  
-3.8  
3,173.7  
Depreciation  
22,433.7  
116,994.1  
15,468.0  
-
154,895.8  
Impairments  
-
993.9  
-
-
993.9  
Reversal of impairments  
-3.6  
-4,103.6  
-
-
-4,107.2  
Disposals  
-1,333.5  
-13,908.2  
-6,880.6  
-28.0  
-22,150.3  
Transfers  
1.5  
4.4  
-
-5.9  
-
30.09.2022  
690,823.8  
2,955,411.0  
197,034.5  
-374.2  
3,842,895.1  
Carrying amount as of 01.10.2021  
530,093.6  
1,261,373.2  
46,489.1  
111,423.4  
1,949,379.3  
Carrying amount as of 30.09.2022  
533,959.6  
1,322,675.7  
47,999.2  
85,369.5  
1,990,004.0  
Manufacturing  
Assets  
Land and  
plant and  
Furniture  
under  
buildings  
equipment  
and fixtures  
construction  
Total  
2020/2021  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Costs  
01.10.2020  
1,167,385.4  
4,097,802.9  
227,437.0  
88,327.7  
5,580,953.0  
Translation differences  
5,787.5  
3,147.7  
1,036.9  
341.9  
10,314.0  
Additions  
17,822.0  
103,860.3  
14,838.5  
72,590.4  
209,111.2  
Disposals  
-3,660.7  
-13,559.7  
-11,462.3  
-565.4  
-29,248.1  
Disposal group IFRS 5  
-
-104,627.3  
-
-7,034.3  
-111,661.6  
Transfers  
10,963.4  
28,968.5  
2,641.5  
-42,573.4  
-
30.09.2021  
1,198,297.6  
4,115,592.4  
234,491.6  
111,086.9  
5,659,468.5  
Accumulated depreciation  
and impairments  
01.10.2020  
650,398.0  
2,761,577.8  
184,360.8  
3,984.9  
3,600,321.5  
Translation differences  
2,609.7  
2,103.6  
755.6  
-6.8  
5,462.1  
Depreciation  
21,525.7  
118,195.7  
14,076.8  
-
153,798.2  
Impairments  
723.0  
-
-
-
723.0  
Reversal of impairments  
-4,111.1  
-3,454.9  
-
-4,314.6  
-11,880.6  
Disposals  
-2,935.0  
-11,547.6  
-11,190.7  
-
-25,673.3  
Disposal group IFRS 5  
-
-12,661.7  
-
-
-12,661.7  
Transfers  
-6.3  
6.3  
-
-
-
30.09.2021  
668,204.0  
2,854,219.2  
188,002.5  
-336.5  
3,710,089.2  
Carrying amount as of 01.10.2020  
516,987.4  
1,336,225.1  
43,076.2  
84,342.8  
1,980,631.5  
Carrying amount as of 30.09.2021  
530,093.6  
1,261,373.2  
46,489.1  
111,423.4  
1,949,379.3  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
191  
Consolidated Financial Statements Notes  
16.1.  
Impairment of cash generating units with own goodwill  
For the purposes of impairment testing, goodwill is allocated to the following cash-  
generating units and the cash flows of these cash-generating units are discounted at the  
following discount rates:  
Goodwill  
Discount rate  
30.09.2022  
30.09.2021  
30.09.2022 30.09.2021  
EUR mill.  
EUR mill.  
%
%
Energy Segment  
Sales  
20.7  
20.7  
5.8  
4.3  
Other  
0.4  
0.4  
5.8  
4.3  
21.1  
21.1  
Waste Management Segment  
Waste Management Austria  
43.1  
43.1  
6.0  
4.5  
Other  
2.2  
2.2  
7.4  
5.4  
45.3  
45.3  
Czech Republic Segment  
CEVAK a.s.  
15.8  
15.3  
5.8  
3.9  
Other  
7.4  
5.5  
5.8-6.1  
3.9-4.7  
23.2  
20.8  
Other  
0.1  
0.1  
-
-
89.7  
87.3  
The recoverable amount attributable to the cash generating unit “Sales” exceeds the carrying  
amount by EUR 50.0 million (previous year: EUR 173.9 million). In the event of a decrease in  
future cash flows by 21.8% (previous year: 55.1%), or an increase in the interest rate by  
1.3% (previous year: 3.7%), the carrying amount corresponds to the present value of the  
future cash flows.  
The recoverable amount of the “Waste Management/Austria” cash-generating unit exceeds  
the carrying amount by EUR 32.4 million (previous year: EUR 79.8 million), while the  
recoverable amount of CEVAK a.s. exceeds the carrying amount by EUR 75.8 million (previous  
year: EUR 146.1 million). In the event of a decrease in future cash flows by 22.9% (previous  
year: 28.2%), or an increase in the interest rate by 0.7% (previous year: 1.3%), the carrying  
amount of the “Waste Management Segment/Austria” cash-generating unit corresponds to  
the present value of the future cash flows. A decrease in CEVAK a.s.' future cash flows by  
10% would not result in an impairment.  
16.2.  
Impairment of cash generating units without own goodwill  
Timelkam CCGT (combined cycle gas-turbine) power plant  
Due to the current situation on the market, impairment testing was performed for the  
Timelkam CCGT power plant (Energy Segment). The maximum output of the power plants  
amounts to 422 MW, maximum district heating supply is 100 MW. Efficiency was estimated  
at 55.7%. Annual electricity generation was recognised at up to 1,741 GWh per year  
(previous year: 2,227 GWh). The assumptions for the future electricity and gas prices are  
based, where available, on market data; if no market data were available, estimates were  
made based on market studies. The estimated electricity price is EUR 93 to EUR 196/MWh  
(previous year: EUR 65.92 to EUR 82.61/MWh). Expenses for maintenance and repair were  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
192  
Consolidated Financial Statements Notes  
recognised according to maintenance plans and contracts. Other material expense items such  
as personnel costs, insurance and infrastructure costs are annually increased by an estimated  
increase rate. The discount rate is 5.8% (previous year: 4.3%). The planning horizon ends in  
the 2037/2038 fiscal year. Due to higher market expectations in particular, an impairment  
reversal of EUR 4.1 million (previous year: impairment reversal of EUR 2.8 million) was  
recognised. The recoverable amount determined using the DCF method corresponds to the  
value in use in the amount of EUR 47.2 million (previous year: EUR 45.3 million). Fluctuations  
in cash flows of 20% resulted in a change of EUR 9.4 million in the recoverable amount. An  
increase in the interest rate by 0.5% results in a reduction of the recoverable amount by  
EUR 1.2 million.  
Impairments in the previous year:  
Due to a revised appraisal of the feasibility of the Ebensee pumped-storage power plant, an  
impairment reversal of EUR 4.4 million was recognised for the Energy Segment. The  
recoverable amount corresponds to the carrying amount of EUR 4.4 million. Impairment  
reversals of EUR 4.7 million for waste incineration plants were recognised for the Waste  
Management Segment, particularly as a result of expected higher proceeds from the  
utilisation of district heat services.  
16.3.  
IFRS 16 (Leases)  
For leased assets, a right-of-use asset representing its right to use an underlying asset is  
capitalised and, at the same time, a lease liability recognised in the amount of the present  
value of the lease payments. Discounting takes place at the lease-specific interest rate. If the  
lease-specific interest rate cannot be determined, the incremental borrowing interest rate is  
applied. Depending on the term, an incremental borrowing interest rate of 1.53% or 2.00%  
was assumed to apply in the 2021/2022 fiscal year. The right of use asset is then amortised  
and the lease liability carried forward using the effective interest method.  
IFRS 16 is not applied to short-term leases and leases concerning an underlying asset of minor  
value. In accordance with IFRS 16.4, the company has opted out of voluntary application of  
IFRS 16 for intangible assets.  
The Group has been leasing the property at Böhmerwaldstraße 3, Linz, where Group  
headquarters is located, from Power Tower GmbH since the year 2008. The Group holds a  
1% share in the entity.  
The entity is not funded by the Group. The leasing contract is for an indefinite period,  
cancellation by the lessee is only possible 20 years after the start of the contract at the  
earliest, under certain circumstances only after 23 years. The Group has the unilateral right,  
but no obligation, to acquire Power Tower GmbH 15 or 20 years after the commencement of  
the lease. Leasing payments are linked to interest rate developments. The Group is required  
to perform the ongoing maintenance of the property and fulfill all legal requirements that  
could also apply to the owner. There are no other additional risks. Power Tower GmbH is to  
be considered a structured entity pursuant to IFRS 12, but the lack of control means that it is  
not to be included as a subsidiary in the Consolidated Financial Statements. In accordance  
with IFRS 16, a right of use asset in the amount of EUR 36.7 million and a lease liability in the  
amount of EUR 37.0 million have been recognised as of 30 September 2022.  
Additionally, in the 2007/2008 fiscal year, plant and equipment assets were sold and leased  
back for a term of 15 years (“sale and leaseback”) in the Waste Management Segment. At  
the end of the lease term, the lessor has the right to sell the asset to the lessee at the  
outstanding loan amount. During the lease term, subleasing to third parties is not permitted.  
The right of use assets have a carrying amount of EUR 9.9 million  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
193  
Consolidated Financial Statements Notes  
(previous year: EUR 12.8 million) as of 30 September 2022 and the corresponding liability  
amounts to EUR 37.4 million (previous year: EUR 40.4 million).  
As of 30 September 2022, the lease liabilities amount to EUR 115.9 million (previous year:  
EUR 114.7 million) (up to 1 year: EUR 45.2 million; 1-5 years EUR 12.7 million, more than  
5 years EUR 58.0 million) (previous year: up to 1 year: EUR 7.6 million, 1-5 years  
EUR 52.4 million, more than 5 years EUR 54.8 million). The Statement of Financial Position  
recognises the lease liabilities in the item for financial liabilities.  
For fiscal year 2021/2022, the cash outflows for leases amount to EUR 10,337.6 thousand  
(previous year: EUR 9,847.4 thousand). Expenses for leases not recognised in accordance with  
IFRS 16 amount to EUR 1,746.8 thousand (of which current rental and lease expenses:  
EUR 604.7 thousand, of which marginal rental and lease expenses: EUR 245.5 thousand, of  
which rental and lease expenses not covered by IFRS 16: EUR 896.6 thousand, of which  
variable rental and lease expenses: EUR 0.0 thousand) (previous year: EUR 1,683.1 thousand;  
of which: short-term rental and lease expenses: EUR 615.1 thousand, of which marginal  
rental and lease expenses: EUR 227.7 thousand, of which rental and lease expenses not  
covered by IFRS 16: EUR 840.3 thousand, of which variable rental and lease expenses:  
EUR: 0.0 thousand).  
The item property, plant and equipment recognises the following right of use assets:  
Manufacturing  
Land and  
plant and  
Furniture  
buildings  
equipment  
and fixtures  
Vehicles  
Total  
2021/2022  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
01.10.2021  
72,321.2  
13,413.2  
228.6  
1,037.4  
87,000.4  
Change in the scope of consolidation  
39.9  
-
-
-
39.9  
Translation differences  
15.9  
-
1.1  
-
17.0  
Additions  
2,928.4  
6,599.8  
33.3  
483.9  
10,045.4  
Disposals  
-1,052.9  
-
-30.6  
-
-1,083.5  
Depreciation  
-4,533.6  
-3,103.8  
-78.3  
-504.8  
-8,220.5  
30.09.2022  
69,718.9  
16,909.2  
154.1  
1,016.5  
87,798.7  
Manufacturing  
Land and  
plant and  
Furniture  
buildings  
equipment  
and fixtures  
Vehicles  
Total  
2020/2021  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
01.10.2020  
68,177.0  
16,396.9  
62.8  
1,026.4  
85,663.1  
Translation differences  
26.6  
-
0.8  
-
27.4  
Additions  
8,634.0  
52.7  
235.9  
647.5  
9,570.1  
Disposals  
-92.4  
-10.7  
-6.8  
-154.2  
-264.1  
Depreciation  
-4,424.0  
-3,025.7  
-64.1  
-482.3  
-7,996.1  
30.09.2021  
72,321.2  
13,413.2  
228.6  
1,037.4  
87,000.4  
16.4.  
Further disclosures  
Research costs in the amount of EUR 5.3 million (previous year: EUR 5.5 million) were  
recognised as expenses.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
194  
Consolidated Financial Statements Notes  
In the 2021/2022 fiscal year, interest on borrowed capital in the amount of  
EUR 149.5 thousand (previous year: EUR 212.0 thousand) was capitalised. The applied  
interest rate was 3.6% (previous year 3.8%).  
Additions to assets under construction led to outflows of payment instruments in the amount  
of EUR 60,297.2 thousand (previous year: EUR 65,083.7 thousand). Obligations for the  
acquisition of property, plant and equipment amount to EUR 46,027.1 thousand (previous  
year: EUR 47,892.0 thousand).  
17.  
Investments  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
Shares in affiliated companies  
1,580.2  
1,580.7  
Shares in companies consolidated at equity  
287,087.3  
233,868.9  
Other investments  
38,864.2  
29,255.3  
327,531.7  
264,704.9  
The Cash Flow Statement includes dividends from entities consolidated using the equity  
method in the amount of EUR 13,076.3 thousand (previous year: EUR 7,407.2 thousand).  
Due to an increase in expected future cash surpluses, a reversal of impairment of  
EUR 3.5 million (previous year: 15.4 million) was recognised for Wels Strom GmbH (Holding &  
Services Segment), which is measured using the equity method.  
18.  
Other financial assets  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
Lendings to companies in which an interest is held  
84,315.6  
5,186.4  
Other lendings  
7,620.2  
6,544.3  
Fixed term deposits  
-
24,847.2  
Securities at Fair Value through Other Comprehensive Income  
8,116.7  
12,631.5  
Securities at Fair Value through Profit or Loss  
26,774.8  
31,109.0  
126,827.3  
80,318.4  
19.  
Other non-current assets  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
CO2 emissions allowances  
-
24,301.9  
Other assets  
8,156.8  
8,102.8  
8,156.8  
32,404.7  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
195  
Consolidated Financial Statements Notes  
20.  
Inventories  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
Primary energy  
113,109.7  
31,358.7  
Raw materials and supplies  
19,623.7  
16,838.1  
Contract assets  
2,945.0  
3,748.8  
Finished goods  
1,515.2  
1,377.0  
137,193.6  
53,322.6  
21.  
Receivables and other assets  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
Trade receivables  
351,894.7  
259,880.2  
Receivables from non-consolidated affiliated companies  
18,248.8  
252.4  
Receivables from joint arrangements and associated companies  
37,325.3  
5,076.8  
Accruals and deferrals of interest  
2,021.5  
1,957.3  
Receivables from initial margins for derivatives  
383,788.7  
74,620.2  
CO2 emissions allowances  
67,971.2  
42,422.0  
Other  
49,370.3  
52,403.1  
910,620.5  
436,612.0  
Receivables from electricity and water supplies that have not been invoiced as of the  
reporting date are accrued and recognised in the item “Trade receivables”.  
22.  
Cash and cash equivalents  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
Cash in hand  
116.7  
131.0  
Current bonds  
300,000.0  
-
Cash in bank  
629,333.2  
219,066.3  
929,449.9  
219,197.3  
23.  
Equity  
The share capital of Energie AG Oberösterreich consists of 88,652,558 individual share  
certificates (previous year: 88,653,782), of which 88,600,000 are ordinary shares (previous  
year: 88,600,000), and 52,558 are preferred shares without voting rights (previous year:  
53,782). The share capital has been fully paid in.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
196  
Consolidated Financial Statements Notes  
The capital reserves result from the share premium of the capital increase, minus the directly  
attributable costs of obtaining equity in the amount of EUR 1,771.9 thousand, as well as  
from the contribution of own shares in the 2006/2007 fiscal year, and from shares issued to  
staff in the 2012/2013 fiscal year.  
In the 2007/2008 fiscal year, 390,000 preferred shares without voting rights were contributed  
to Energie AG Oberösterreich. These shares were offered to Group staff members at  
favourable conditions during the 2007/2008 fiscal year. The benefit per staff member  
amounted to the maximum tax-exempt sum pursuant to § 3 para 1 subpara 15 letter b of the  
Austrian Income Tax Act.  
In the 2012/2013 fiscal year, 87,750 shares were issued to employees of the Group at  
discounted prices. The capital increase took effect with entry in the Register of Companies on  
29 October 2013.  
In fiscal year 2021/2022, the share capital was reduced due to the redemption of 1,224  
(previous year: 1,742) treasury shares (preference shares without voting rights).  
The retained earnings result from the profits that the Group generated but did not distribute.  
Other reserves include IFRS 9 reserves, IAS 19 reserves, revaluation reserves, and treasury  
stock reserves, as well as reserves from translation differences.  
The reserves under IFRS 9 include changes in the fair value of investments and securities  
measured “At Fair Value through Other Comprehensive Income” (FVOCI), and changes in the  
fair value of cash flow hedges, as well as changes in the equity of associated companies  
consolidated using the equity method recognised outside profit or loss.  
As of 30 September 2022, the cash flow hedge reserve amounts to EUR 345,219.7 thousand  
(previous year: EUR 122,015.9 thousand). The effective share of the fair value changes  
concerning cash-flow hedges is recognised in the other comprehensive income in the cash-  
flow hedge reserve. The ineffective share of the fair-value changes from cash flow hedges in  
the amount of EUR 95.1 thousand (previous year: EUR -85.4 thousand) was recognised as  
income through profit or loss. Fair value changes in the amount of EUR 394,614.6 thousand  
(previous year: EUR 149,211.7 thousand) are recognised as other comprehensive income.  
During the fiscal year, EUR -171,410.8 thousand (previous year: EUR -6,457.4 thousand) were  
withdrawn from the cash-flow hedge reserve and recognised through profit or loss. Of this  
amount, EUR 2,543.2 thousand (previous year: EUR 2,748.6 thousand) were recognised as  
expense in the financial result and EUR 173,954.0 thousand (previous year:  
EUR 9,206.0 thousand) as income in the operating result.  
The OCI reserve, which is part of the IFRS 9 reserves, includes changes in value of investments  
and securities classified as “At Fair Value through Other Comprehensive Income” (FVOCI),  
which are recognised in other comprehensive income. As of 30 September 2022, the OCI  
reserve amounts to EUR 35,082.2 thousand (previous year: EUR 28,359.2 thousand).  
Changes in market value of EUR 5,911.4 thousand (previous year: EUR 5,529.5 thousand) in  
the fiscal year were recognised in equity under other comprehensive income and transfers  
made to retained earnings in the amount of EUR 811.6 thousand (previous year:  
EUR 0.00 thousand).  
The IAS 19 reserves result from the actuarial valuation of pension and severance provisions  
recognised in other comprehensive income.  
The revaluation reserve results from first-time consolidations in previous years.  
As of 30 September 2022, the company held 808 treasury shares (previous year: 1,224).  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
197  
Consolidated Financial Statements Notes  
Capital management  
It is the objective of the Group’s capital management to preserve a strong capital base so that  
the company can continue to generate adequate returns for the investors corresponding with  
the risk situation of the company, promote the future development of the company, and also  
provide benefits for other interest groups. Value based management is firmly entrenched in  
the management systems and in management processes. The equity in the books according  
to IFRS is what the management considers to be capital. As of the reporting date, the equity  
ratio amounted to 26.0% (previous year: 39.6%). For purposes of internal reporting and  
management, the return on capital employed (ROCE) is also used. The capital employed  
includes the assets attributable to a unit, with the exception of the assets not used in the  
process of creating and utilising goods and services, less non-interest bearing liabilities and  
certain provisions.  
24.  
Financial instruments and financial risk management  
24.1.  
Derivative financial instruments and hedging  
The Group’s risk management uses derivative financial instruments that predominantly serve  
the purpose of hedging price and interest rate risks. The accounting of these derivative  
financial instrument applies – in as far as hedging transactions are concerned and the criteria  
are met – the cash flow hedge and fair value hedge accounting methods.  
The use of derivative financial instruments in the Group is subject to corresponding  
authorisation and control procedures. Proprietary trading is only carried out within very tightly  
defined limits.  
Interest rate swaps are used for hedging future variable interest payments on funding and  
leasing contracts as well as highly probable funding in the future. Energie AG Group hedges  
these by purchasing interest rate swaps that correspond to the hedged item in terms of the  
base interest rate, payment dates, interest rate fixing date, nominal amounts and maturities.  
As their essential parameters concur, a commercial relationship between the hedged item and  
the hedging transaction can be affirmed. Hedges may be ineffective in the case of changes in  
the counterparty’s and Energie AG’s credit risk, as well as in cases where the measurement-  
relevant parameters differ from the hedged item and hedging transaction. The qualitative and  
quantitative effectiveness of a hedge is determined on the basis of the hypothetical  
derivatives method.  
Futures and forwards are used to hedge price-related risks from electricity procurement and  
electricity sales. The objective of Energie AG Group is to hedge the entire price risk using  
derivative and non-derivative financial instruments and thereby reduce the cash flow risk from  
electricity purchasing and sales and/or the fair value risk from firm commitments. This means  
that only a portion of the total volume is hedged using derivative financial instruments.  
Hedging is carried out on a rolling basis. Either the entire price risk is hedged, or only a  
component of the risk. Components are hedged if the hedging instrument has a different  
market price zone than the hedged item. The difference between prices in different market  
price zones is observable on the market and amounted to an average of EUR27.54/MWh  
(previous year: EUR 3.38/MWh) in fiscal year 2021/2022. The commercial relationship results  
either from almost identical parameters of hedged item and hedging transaction (in particular  
base price, performance, term and price base), or the high correlation of prices in different  
market price zones in cases where only a component is hedged. A hedging ineffectiveness  
may result from temporal differences, price differences, different market price zones or the  
counterparty’s credit risk. The qualitative and quantitative effectiveness of a hedge is  
determined on the basis of the hypothetical derivatives method.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
198  
Consolidated Financial Statements Notes  
Futures, forwards and swaps are used to hedge price risks from gas purchases and gas sales.  
The hedging aims at reducing the cash flow risk or fair value risk from firm commitments. The  
hedging volume is determined on the basis of the hedging strategy. Only a portion of the  
purchases and sales are hedged using derivative instruments. The commercial relationship  
either results from almost identical parameters (in particular volume, price and term), or from  
the high correlation of prices if the hedged item and the hedging transaction have a different  
price base. A hedging ineffectiveness may result from temporal differences, price differences,  
different market price zones or the counterparty’s credit risk. The qualitative and quantitative  
effectiveness of a hedge is determined on the basis of the hypothetical derivatives method.  
Futures are used to hedge procurement and sales of CO2 emissions allowances. The hedging  
aims at reducing the cash flow risk. Only a portion of the total volume is hedged on the basis  
of the hedging strategy. The commercial relationship results from almost identical parameters  
(in particular volume, price and term). Ineffective hedges may result from temporal  
differences or the counterparties’ credit risk. The qualitative and quantitative effectiveness of  
a hedge is determined on the basis of the hypothetical derivatives method.  
Beyond that, gas-oil-swaps are concluded to hedge the price risks of purchasing fuel. The  
objective is to reduce the cash flow risk from fuel purchases. The hedging volume results from  
the hedging strategy and concerns only a portion of the fuel purchases. The commercial  
relationship is established on the basis of the parameters quantity, term and the evidence for  
the correlation of the prices of the hedged item and the hedging transaction. Ineffective  
hedges may result from temporal differences, price differences and the counterparties’ credit  
risk. The qualitative and quantitative effectiveness of a hedge is determined on the basis of  
the hypothetical derivatives method.  
The spark-spread risk from Gas- und Dampfkraftwerk Timelkam GmbH (CCGT power plant)  
and Cogeneration-Kraftwerke Management Oberösterreich GmbH (CMOÖ) is hedged using  
electricity, gas and CO2 emissions allowances. The commercial relationship results from  
almost identical parameters (in particular volume, price and term). In these cases, a dynamic  
hedging strategy based on defined targets and price developments does frequently result in  
the termination and redesignation of hedging relationships. Ineffective hedges may result  
from temporal differences, price differences and the counterparties’ credit risk. The qualitative  
and quantitative effectiveness of a hedge is determined on the basis of the hypothetical  
derivatives method.  
Due to the volatile and uncertain situation, hedging instruments associated with CCGT and  
CMOÖ (hedging for the procurement of gas and CO2 emissions allowances, sale of electricity)  
were reversed. The reversals resulted in income of EUR 25.5 million for the CCGT and  
expenses of EUR 17.1 million for the CMOÖ.  
The Group holds fair value hedges for firm commitments relating to transactions for  
procuring and supplying electricity and gas and for supplying CO2.  
Cash flow hedges are used to protect future cash flows. The Group also uses electricity, gas,  
CO2 futures, as well as gas and gas-oil swaps, to hedge price risks; interest rate swaps are  
used to hedge the cash flow risks of variable-interest liabilities and highly probable funding in  
the future.  
The cash inflows from hedging transactions in the amount of EUR 1,694.6 million (previous  
year: EUR 320.8 million) included in the cash flow statement mainly comprise margins from  
electricity, gas and CO2 futures as well as cash inflows from collateral annexes. The non-cash  
items from derivatives of EUR -383.0 million (previous year: EUR -44.9 million) include  
amounts transferred from the cash flow hedge reserve because the hedged item affected  
profit or loss and non-cash items from derivatives without a hedging relationship. The  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
199  
Consolidated Financial Statements Notes  
collateral for derivatives in the amount of EUR -342.5 million (previous year:  
EUR -50.9 million) is cash and cash equivalents that had to be deposited as collateral for stock  
exchange transactions.  
24.2.  
Disclosures on hedging transactions  
24.2.1.  
Cash flow hedges  
For cash flow hedges, the carrying amounts, nominal amounts and changes in fair values for  
the reporting period used for recognising an ineffective hedge are as follows:  
Change in the  
Positive  
Negative  
fair value for  
fair  
fair  
ineffectiveness  
values  
values  
Nominal  
measurement  
30.09.2022  
EUR 1,000  
EUR 1,000  
Unit  
amount  
EUR 1,000  
Electricity futures, forwards – sales  
19,733.2  
-424,257.6  
GWh  
1,676.9  
-229,692.2  
Electricity futures, forwards – procurement  
573,374.6  
-93,344.4  
GWh  
4,034.1  
260,753.5  
Gas futures – sales  
-
-10,564.4  
GWh  
109.7  
-8,672.9  
Gas futures and swaps – procurement  
100,898.5  
-
GWh  
1,210.8  
66,503.2  
Gas-oil swaps – procurement  
2,344.5  
-553.3  
Tonnes  
7,200.0  
820.0  
CO2 futures – sales  
26.7  
-
Tonnes  
1,000.0  
682.4  
CO2 futures – procurement  
803.3  
-2,144.3  
Tonnes  
167,000.0  
-9,435.4  
Interest rate swaps  
21,689.4  
-2,473.8  
EUR mill.  
168.9  
27,885.5  
Total  
718,870.2  
-533,337.8  
108,844.1  
Change in the  
Positive  
Negative  
fair value for  
fair  
fair  
ineffectiveness  
values  
values  
Nominal  
measurement  
30.09.2021  
Unit  
amount  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Electricity futures, forwards – sales  
101.3  
-174,933.5  
GWh  
3,980.9  
-176,258.2  
Electricity futures, forwards – procurement  
219,773.8  
-497.1  
GWh  
3,912.0  
221,608.9  
Gas futures – sales  
-
-1,891.5  
GWh  
210.9  
-1,891.5  
Gas futures, forwards and swaps – procurement  
34,405.9  
-10.6  
GWh  
1,698.4  
36,974.8  
Gas-oil swaps – procurement  
1,238.7  
-267.5  
Tonnes  
6,900.0  
1,306.4  
CO2 futures – sales  
-
-655.7  
Tonnes  
27,000.0  
118.0  
CO2 futures – procurement  
8,413.8  
-319.4  
Tonnes  
1,024,000.0  
7,486.9  
Interest rate swaps  
2,443.2  
-11,113.1  
EUR mill.  
172.0  
7,616.2  
Total  
266,376.7  
-189,688.4  
96,961.5  
If not yet cleared, the positive fair values of the derivatives are reported in the non-current  
and current item “Derivative financial instruments”, while negative fair values, if not yet  
cleared, are reported in the non-current and current item “Derivative financial instruments”.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
200  
Consolidated Financial Statements Notes  
The nominal values and average hedging prices for cash flow hedges are as follows:  
30.09.2022  
Unit  
2022  
2023  
2024  
2025  
> 2025  
Electricity futures, forwards – sales  
Nominal amount  
GWh  
332.8  
1,238.9  
105.2  
-
-
Average price hedged  
EUR  
61.45  
224.32  
277.39  
-
-
Electricity futures, forwards – procurement  
Nominal amount  
GWh  
747.5  
2,218.3  
508.9  
419.3  
140.1  
Average price hedged  
EUR  
273.44  
344.94  
69.42  
162.83  
117.88  
Gas futures – sales  
Nominal amount  
GWh  
-
-
98.9  
10.8  
-
Average price hedged  
EUR  
-
-
19.58  
20.25  
-
Gas futures and swaps – procurement  
Nominal amount  
GWh  
64.1  
116.7  
250.3  
665.9  
113.9  
Average price hedged  
EUR  
18.46  
24.01  
18.61  
21.48  
21.15  
Gas-oil swaps – procurement  
Nominal amount  
Tonnes  
900.0  
3,300.0  
2,100.0  
900.0  
-
Average price hedged  
EUR  
567.73  
528.15  
569.60  
689.47  
-
CO2 futures – Sales CO2 emissions allowances  
Nominal amount  
Tonnes  
1,000.0  
-
-
-
-
Average price hedged  
EUR  
93.40  
-
-
-
-
CO2 futures – procurement CO2 emission allowances  
Nominal amount  
Tonnes  
167,000.0  
-
-
-
-
Average price hedged  
EUR  
74.76  
-
-
-
-
Interest rate swaps  
Nominal amount  
EUR mill.  
167.3  
131.6  
131.6  
131.6  
131.6  
Average fixed interest rate  
%
3.22  
4.62  
4.62  
1.33  
1.33  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
201  
Consolidated Financial Statements Notes  
30.09.2021  
Unit  
2021  
2022  
2023  
2024  
> 2024  
Electricity futures, forwards – sales  
Nominal amount  
GWh  
275.5  
1,469.0  
1,235.0  
1,001.4  
-
Average price hedged  
EUR  
59.88  
51.92  
65.51  
69.82  
-
Electricity futures, forwards – procurement  
Nominal amount  
GWh  
742.6  
1,843.1  
566.8  
417.9  
341.6  
Average price hedged  
EUR  
102.96  
65.92  
54.71  
57.26  
62.18  
Gas futures – sales  
Nominal amount  
GWh  
-
66.2  
35.0  
98.9  
10.8  
Average price hedged  
EUR  
-
73.95  
25.60  
19.58  
20.25  
Gas futures, forwards and swaps – procurement  
Nominal amount  
GWh  
153.0  
381.6  
378.0  
650.0  
135.8  
Average price hedged  
EUR  
17.82  
23.63  
18.53  
19.70  
19.83  
Gas-oil swaps – procurement  
Nominal amount  
Tonnes  
900.0  
3,000.0  
2,100.0  
900.0  
-
Average price hedged  
EUR  
428.55  
379.51  
417.66  
435.00  
-
CO2 futures – Sales CO2 emissions allowances  
Nominal amount  
Tonnes  
27,000.0  
-
-
-
-
Average price hedged  
EUR  
37.46  
-
-
-
-
CO2 futures – procurement CO2 emission allowances  
Nominal amount  
Tonnes  
919,000.0  
60,000.0  
30,000.0  
15,000.0  
-
Average price hedged  
EUR  
55.06  
38.00  
44.28  
66.95  
-
Interest rate swaps  
Nominal amount  
EUR mill.  
170.5  
167.3  
131.6  
131.6  
131.6  
Average fixed interest rate  
%
3.17  
3.22  
4.62  
4.62  
1.33  
The above reporting of derivatives is broken down by calendar year in which these fall due.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
202  
Consolidated Financial Statements Notes  
24.2.2.  
Fair value hedges  
For fair value hedges, the carrying amounts, nominal amounts and changes in fair values for  
the reporting period used for recognising an ineffective hedge are as follows:  
Change in the fair  
Positive  
Negative  
value for  
fair  
fair  
ineffectiveness  
values  
values  
Nominal  
measurement  
30.09.2022  
EUR 1,000  
EUR 1,000  
Unit  
amount  
EUR 1,000  
Electricity forwards – sales  
-
-8,681.2  
GWh  
24.9  
-3,636.2  
Electricity forwards – procurement  
3,827.7  
-555.4  
GWh  
11.0  
3,121.7  
Gas futures – procurement  
68,735.3  
-
GWh  
948.9  
64,563.5  
CO2 futures – sales  
-
-
Tonnes  
-
2,342.3  
Total  
72,563.0  
-9,236.6  
66,391.3  
Change in the fair  
Positive  
Negative  
value for  
fair  
fair  
ineffectiveness  
values  
values  
Nominal  
measurement  
30.09.2021  
EUR 1,000  
EUR 1,000  
Unit  
amount  
EUR 1,000  
Electricity forwards – sales  
-
-5,045.0  
GWh  
57.5  
-4,731.1  
Electricity futures and forwards – procurement  
150.6  
-
GWh  
11.9  
-40.2  
Gas futures – procurement  
4,190.7  
-18.9  
GWh  
631.2  
4,372.9  
CO2 futures – sales  
343.9  
-2,686.2  
Tonnes  
835,000.0  
-2,342.3  
Total  
4,685.2  
-7,750.1  
-2,740.7  
The nominal values and average hedging prices for fair value hedges are as follows:  
30.09.2022  
Unit  
2022  
2023  
2024  
2025  
> 2025  
Electricity forwards – sales  
Nominal amount  
GWh  
5.2  
17.5  
-
-
-
Average price hedged  
EUR  
85.91  
77.53  
-
-
-
Electricity forwards – procurement  
Nominal amount  
GWh  
2.2  
8.8  
-
-
-
Average price hedged  
EUR  
133.10  
76.50  
-
-
-
Gas futures – procurement  
Nominal amount  
GWh  
-
63.6  
193.2  
569.4  
122.7  
Average price hedged  
EUR  
-
35.96  
21.94  
20.81  
21.62  
CO2 futures – sales  
Nominal amount  
Tonnes  
-
-
-
-
-
Average price hedged  
EUR  
-
-
-
-
-
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
203  
Consolidated Financial Statements Notes  
30.09.2021  
Unit  
2021  
2022  
2023  
2024  
> 2024  
Electricity forwards – sales  
Nominal amount  
GWh  
28.1  
11.9  
17.5  
-
-
Average price hedged  
EUR  
44.73  
46.58  
77.53  
-
-
Electricity futures and forwards – procurement  
Nominal amount  
GWh  
3.2  
-
8.7  
-
-
Average price hedged  
EUR  
207.50  
-
76.50  
-
-
Gas futures – procurement  
Nominal amount  
GWh  
-
52.6  
43.8  
166.9  
367.9  
Average price hedged  
EUR  
-
23.08  
24.86  
18.65  
18.32  
CO2 futures – sales  
Nominal amount  
Tonnes  
30,000.0  
805,000.0  
-
-
-
Average price hedged  
EUR  
55.20  
59.34  
-
-
-
The above reporting of energy derivatives is broken down by calendar year in which these fall  
due.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
204  
Consolidated Financial Statements Notes  
24.3.  
Disclosures on hedged items and the reserve for cash flow hedges  
The carrying amounts of the hedged items in fair value hedges, the reserve for cash flow  
hedges and the change in the fair value for the determination of ineffective cash flow hedges  
and fair value hedges for the reporting period are as follows:  
Change in the Amount in the Amount in the  
Change in the  
Carrying  
Carrying  
fair value for reserves for reserves for  
fair value for amount of the amount of the  
ineffectiveness measurements measurements ineffectiveness hedged item in hedged item in  
measurement  
of cash flow  
of cash flow  
measurement  
fair value  
fair value  
(cash flow hedges closed  
hedges open  
(fair value hedges closed  
hedges open  
hedges)  
derivatives  
derivatives  
hedges)  
derivatives  
derivatives  
30.09.2022  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Future electricity sales  
229,692.2  
-30,006.3  
-404,524.5  
505.7  
3,340.2  
5,532.9  
Future electricity procurement  
-260,753.5  
180,047.4  
480,030.2  
575.3  
-
-
Future gas sales  
8,672.9  
-1,794.0  
-10,564.4  
-
-
-
Future gas purchases  
-66,503.2  
11,372.5  
100,898.5  
-66,803.2  
-5,894.2  
-71,071.9  
Future diesel purchases  
-820.0  
67.8  
1,791.1  
-
-
-
Future sales of CO2 emissions  
allowances  
-682.4  
-
26.7  
-2,302.2  
-
-
Future purchases of CO2  
emissions allowances  
9,435.4  
-
-1,340.9  
-
-
-
Financial liabilities bearing  
variable interest  
-27,790.4  
-
19,215.6  
-
-
-
Change in the Amount in the Amount in the  
Change in the  
Carrying  
Carrying  
fair value for reserves for reserves for  
fair value for amount of the amount of the  
ineffectiveness measurements measurements ineffectiveness hedged item in hedged item in  
measurement  
of cash flow  
of cash flow  
measurement  
fair value  
fair value  
(cash flow hedges closed  
hedges open  
(fair value hedges closed  
hedges open  
hedges)  
derivatives  
derivatives  
hedges)  
derivatives  
derivatives  
30.09.2021  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Future electricity sales  
176,258.2  
-3,083.2  
-174,832.2  
5,027.2  
-
5,027.2  
Future electricity procurement  
-221,608.9  
48,400.0  
219,276.7  
-610.1  
-
-575.3  
Future gas sales  
1,891.5  
-
-1,891.5  
-
-
-
Future gas purchases  
-36,974.8  
-8.0  
34,395.3  
-4,472.6  
206.1  
-4,268.7  
Future diesel purchases  
-1,306.4  
-76.3  
971.2  
-
-
-
Future sales of CO2 emissions  
allowances  
-118.0  
-
-655.7  
2,302.2  
-
2,302.2  
Future purchases of CO2  
emissions allowances  
-7,486.9  
-
8,094.4  
-
-
-
Financial liabilities bearing  
variable interest  
-7,711.3  
-
-8,574.8  
-
-
-
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
205  
Consolidated Financial Statements Notes  
The development of the reserves for cash flow hedges is as follows:  
Transfers from reserves to profit or loss  
Amounts  
for which  
hedge  
accounting  
was  
previously  
Amounts  
applied  
Consolidated transferred  
and the  
Hedging gains  
Statement of  
because  
Consolidated  
hedged  
Consolidated  
(+)/ Ineffective Comprehensive  
the  
Statement of  
future  
Statement of  
losses (-) hedges Income item in  
hedged Comprehensive cash flows Comprehensive  
recognised in recognised  
which  
item Income item in  
are no Income item in  
the other  
through  
ineffective  
affected which transfer  
longer which transfer  
comprehensive  
profit or  
hedge was  
profit or  
was  
expected  
was  
income  
loss  
recognised  
loss  
recognised  
to occur  
recognised  
2021/2022  
EUR 1,000  
EUR 1,000  
EUR 1,000  
TEUR  
EUR 1,000  
TEUR  
EUR 1,000  
Electricity futures, forwards  
– sales  
-374,490.9  
-
-
-15,726.0  
Sales revenues  
133,601.7  
Sales revenues  
Expenses for  
material and  
Electricity futures, forwards  
other purchased  
– procurement  
636,772.7  
-
-
-244,371.7  
services  
-
Gas futures – sales  
-7,138.5  
-
-
-3,186.2  
Sales revenues  
-
Expenses for  
material and  
Gas futures, forwards and  
other purchased  
swaps – procurement  
117,374.7  
-
-
-29,213.8  
services  
-10,419.3  
Sales revenues  
Sonstige  
Gas-oil swaps –  
betriebliche  
procurement  
2,712.8  
-
-
-1,748.8  
Aufwendungen  
-
CO2 futures – sales  
-450.3  
-
-
1,132.5  
Sales revenues  
-
Expenses for  
material and  
other purchased  
CO2 futures – procurement  
-5,413.0  
-
-
6,977.2  
services  
-10,999.6  
Sales revenues  
Other interest  
Financing  
Interest rate swaps  
25,247.1  
95.1  
income  
2,543.2  
expenses  
-
Total  
394,614.6  
95.1  
-283,593.6  
112,182.8  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
206  
Consolidated Financial Statements Notes  
Transfers from reserves to profit or loss  
Amounts  
for which  
hedge  
accounting  
was  
previously  
Amounts  
applied  
Consolidated transferred  
and the  
Hedging gains  
Statement of  
because  
Consolidated  
hedged  
Consolidated  
(+)/ Ineffective Comprehensive  
the  
Statement of  
future  
Statement of  
losses (-) hedges Income item in  
hedged Comprehensive cash flows Comprehensive  
recognised in recognised  
which  
item Income item in  
are no Income item in  
the other  
through  
ineffective  
affected which transfer  
longer which transfer  
comprehensive  
profit or  
hedge was  
profit or  
was  
expected  
was  
income  
loss  
recognised  
loss  
recognised  
to occur  
recognised  
2020/2021  
EUR 1,000  
EUR 1,000  
EUR 1,000  
TEUR  
EUR 1,000  
TEUR  
EUR 1,000  
Electricity futures, forwards  
– sales  
-182,572.0  
-
-
3,123.2  
Sales revenues  
-
-
Expenses for  
material and  
Electricity futures, forwards  
other purchased  
– procurement  
281,299.4  
-
-
-11,165.8  
services  
-
-
Gas futures – sales  
-1,891.5  
-
-
-
Sales revenues  
-
-
Expenses for  
material and  
Gas futures, forwards and  
other purchased  
swaps – procurement  
39,226.3  
-
-
-2,251.7  
services  
-
-
Sonstige  
Gas-oil futures and swaps  
Other operating  
betriebliche  
– procurement  
1,597.4  
9.7  
expenses  
59.3  
Aufwendungen  
-
-
CO2 futures – sales  
-1,654.3  
-
-
1,772.4  
Sales revenues  
-
-
Expenses for  
material and  
other purchased  
CO2 futures – procurement  
8,230.2  
-
-
-743.4  
services  
-
-
Other interest  
Financing  
Interest rate swaps  
4,976.2  
-95.1  
income  
2,748.6  
expenses  
-
-
Total  
149,211.7  
-85.4  
-6,457.4  
-
-
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
207  
Consolidated Financial Statements Notes  
The Energie AG Group holds the following derivatives not dedicated to any hedging  
relationship:  
Nominal Value  
Positive  
Negative  
fair values  
fair values  
30.09.2022  
Purchase  
Sale  
EUR 1,000  
EUR 1,000  
Derivatives not designated as hedging  
instruments  
Electricity forwards  
EUR 1,202.9 mill.  
EUR 670.6 mill.  
1,224,953.0  
-1,860,867.1  
Electricity futures  
EUR 1,068.0 mill.  
EUR 1,258.7 mill.  
1,767,405.1  
-1,473,395.0  
Gas forwards  
EUR 45.2 mill.  
EUR 13.4 mill.  
212,674.9  
-16,016.3  
Gas futures  
EUR 423.1 mill.  
EUR 796.3 mill.  
1,734,896.1  
-1,590,170.1  
CO2 forwards  
EUR 47.2 mill.  
EUR 21.0 mill.  
4,438.0  
-3,092.1  
CO2 futures  
EUR 142.7 mill.  
EUR 174.4 mill.  
28,470.9  
-25,649.5  
Nominal Value  
Positive  
Negative  
fair values  
fair values  
30.09.2021  
Purchase  
Sale  
EUR 1,000  
EUR 1,000  
Derivatives not designated as hedging  
instruments  
Electricity forwards  
EUR 146.7 mill.  
EUR 145.5 mill.  
151,708.7  
-153,816.2  
Electricity futures  
EUR 2.0 mill.  
EUR 1.0 mill.  
245.4  
-807.6  
Gas forwards  
EUR 0.3 mill.  
EUR 0.2 mill.  
1,018.2  
-106.4  
Gas futures  
EUR 5.2 mill.  
EUR 7.9 mill.  
4,502.7  
-5,326.7  
CO2 forwards  
EUR 12.0 mill.  
EUR 0.0 mill.  
1,797.2  
-1.6  
CO2 futures  
EUR 5.6 mill.  
EUR 19.3 mill.  
3,318.6  
-3,814.9  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
208  
Consolidated Financial Statements Notes  
24.4.  
Carrying amounts in accordance with IFRS 9  
In accordance with IFRS 9 or IFRS 16, the carrying amounts of financial assets and liabilities  
are grouped into classes or measurement categories as follows:  
Carrying amount  
Carrying amount  
Category acc.  
30.09.2022  
30.09.2021  
to IFRS 9  
EUR 1,000  
EUR 1,000  
Investments  
40,444.4  
30,836.0  
Shares in affiliated companies  
FVOCI  
1,580.2  
1,580.7  
Other investments  
FVOCI  
38,864.2  
29,255.3  
Other financial assets  
126,827.3  
80,318.4  
Lendings to companies in which an interest is held  
AC  
84,315.6  
5,186.4  
Other lendings  
AC  
7,620.2  
6,544.3  
Fixed term deposits  
AC  
-
24,847.2  
Securities FVOCI  
FVOCI  
8,116.7  
12,631.5  
Securities FVPL  
FVPL  
26,774.8  
31,109.0  
Derivative financial instruments (non-current and current)  
1,968,863.3  
371,702.0  
Derivatives designated as hedging instruments (cash flow hedge)  
n/a  
512,188.6  
211,765.5  
Derivatives designated as hedging instruments (fair value hedge)  
n/a  
14,608.8  
5,412.4  
Derivatives not designated as hedging instruments  
FVPL  
1,442,065.9  
154,524.1  
Receivables and other assets (non-current and current) acc. to the  
Statement of Financial Position  
918,777.3  
469,016.7  
Thereof non-financial assets  
107,107.6  
86,351.6  
Thereof financial assets  
811,669.7  
382,665.1  
Trade receivables  
AC  
351,991.7  
259,902.2  
Receivables from affiliated companies  
AC  
18,248.8  
252.4  
Receivables from joint arrangements and associated companies  
AC  
37,325.3  
5,076.8  
Other financial assets  
AC  
404,103.9  
117,433.7  
Fixed term deposits and short-term investments  
273,472.6  
105,775.3  
Fixed term deposits  
AC  
113,868.6  
85,816.1  
Short-term investments  
FVPL  
159,604.0  
19,959.2  
Cash and cash equivalents  
AC  
929,449.9  
219,197.3  
Total financial assets  
4,150,727.2  
1,190,494.1  
Financial liabilities (non-current and current)  
660,478.2  
670,096.9  
Bonds  
FLAC  
300,896.3  
301,231.8  
Liabilities to banks  
FLAC  
8,362.7  
6,530.5  
Lease liabilities  
IFRS 16  
115,897.0  
114,748.8  
Other financial liabilities  
FLAC  
235,322.2  
247,585.8  
Trade payables (current)  
FLAC  
279,156.4  
162,178.9  
Derivative financial instruments (non-current and current)  
2,946,453.5  
517,384.3  
Derivatives designated as hedging instruments (cash flow hedge)  
n/a  
422,366.9  
179,434.5  
Derivatives designated as hedging instruments (fair value hedge)  
n/a  
92,445.1  
9,986.3  
Derivatives not designated as hedging instruments  
FVPL  
1,879,975.5  
153,924.2  
Received margin payments  
n/a  
551,666.0  
174,039.3  
Other liabilities (non-current and current) acc. to the Statement of  
Financial Position  
466,461.6  
231,417.6  
Thereof non-financial liabilities  
216,518.3  
150,359.7  
Thereof financial liabilities  
249,943.3  
81,057.9  
Liabilities to affiliated companies  
FLAC  
560.7  
9,292.5  
Liabilities to joint arrangements and associated companies  
FLAC  
5,357.5  
2,774.3  
Other financial liabilities (non-current and current)  
FLAC  
244,025.1  
68,991.1  
Total financial liabilities  
4,136,031.4  
1,430,718.0  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
209  
Consolidated Financial Statements Notes  
Carrying amount  
Carrying amount  
Category acc.  
30.09.2022  
30.09.2021  
to IFRS 9  
EUR 1,000  
EUR 1,000  
Carrying amounts grouped to measurement categories according to  
IFRS 9  
Financial Assets at Amortized Costs (AC)  
1,946,924.0  
724,256.4  
Financial Assets at Fair Value through Other Comprehensive Income (FVOCI)  
48,561.1  
43,467.5  
Financial Assets at Fair Value through Profit or Loss (FVPL)  
1,628,444.7  
205,592.3  
Financial Liabilities at Amortized Cost (FLAC)  
1,073,680.9  
798,584.9  
Financial Liabilities at Fair Value through Profit or Loss (FVPL)  
1,879,975.5  
153,924.2  
As of 30 September 2022, the Energie AG Group holds shares in affiliated companies and  
other investments in the amount of EUR 40,444.4 thousand (previous year: EUR 30,836.0), as  
well as securities (stocks) in the amount of EUR 8,116.7 thousand (previous year:  
EUR 12,631.5 thousand) classified as “Financial Assets Through Other Comprehensive Income  
(FVOCI)”. These investments are held for long-term, strategic purposes. For  
fiscal year 2021/2022, the dividends distributed for securities amount to EUR 428.2 thousand  
(previous year: EUR 210.8 thousand). Dividends distributed for investments amount to  
EUR 2,607.0 thousand (previous year: EUR 1,924.3 thousand).  
In the 2021/2022 fiscal year, two Czech investments and Oberösterreichische Gemeinnützige  
Bau- und Wohngesellschaft mit beschränkter Haftung (previous year: no strategic  
investments) were sold. EUR 811.6 thousand (previous year: EUR 0.0 thousand) of  
accumulated losses were reclassified within equity.  
24.5.  
Offsetting of financial assets and liabilities  
The following table shows the effect of netting agreements:  
30.09.2022  
30.09.2021  
Reported  
Effects from  
Reported  
Effects from  
financial  
offsetting  
financial  
offsetting  
assets/  
framework  
assets/  
framework  
liabilities  
agreements  
Net amounts  
liabilities  
agreements  
Net amounts  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Financial assets  
Trade receivables  
351,991.7  
-14,270.1  
337,721.6  
259,902.2  
-13,478.0  
246,424.2  
Positive fair value of derivatives  
1,968,863.3  
-1,494,582.9  
474,280.4  
371,702.0  
-250,090.6  
121,611.4  
Total  
2,320,855.0  
-1,508,853.0  
812,002.0  
631,604.2  
-263,568.6  
368,035.6  
Financial liabilities  
Trade payables  
279,156.4  
-14,270.1  
264,886.3  
162,178.9  
-13,478.0  
148,700.9  
Negative fair value of derivatives  
2,394,787.5  
-1,494,582.9  
900,204.6  
343,345.0  
-250,090.6  
93,254.4  
Total  
2,673,943.9  
-1,508,853.0  
1,165,090.9  
505,523.9  
-263,568.6  
241,955.3  
At the Energie AG Oberösterreich Group, the derivative financial instruments and receivables/  
payables presented above are concluded on the basis of standard agreements (e.g. ISDA,  
EFET, German Master Agreement for Financial Derivative Transactions), which, in the event of  
insolvency of a business partner, permit the offsetting of outstanding transactions. The  
criteria for netting in the statement of financial position are not met, because either no net  
payments are being made or the legal enforceability of the netting agreements is uncertain.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
210  
Consolidated Financial Statements Notes  
24.6.  
Measurement at fair value  
24.6.1.  
Fair value of financial assets and liabilities that are measured regularly at fair  
value  
Pursuant to IFRS 13, financial instruments that are measured at fair value are classified within  
a fair value hierarchy. In view of possible uncertainties relating to possible estimates of the  
fair values, a distinction is made between three levels:  
Level 1: Measurement on the basis of a published price quotation for identical assets or  
liabilities in an active market.  
Level 2: Measurement on the basis of inputs that are observable either directly or indirectly in  
the market and measurements based on prices quoted in inactive markets.  
Level 3: Measurement on the basis of inputs not observable in the market.  
If the inputs used to determine the fair value of an asset or liability are attributable to  
different levels of the fair value hierarchy, the measurement at fair value is wholly assigned to  
the fair value hierarchy level that corresponds to the lowest input which, in the aggregate, is  
material for the measurement.  
The financial instruments measured at fair value are assigned to levels 1 to 3:  
Measurement  
on the basis  
of inputs  
Measurement  
observable  
Other  
at market  
on the  
measurement  
Carrying  
prices  
market  
methods  
Total fair  
amount  
Level 1  
Level 2  
Level 3  
value  
30.09.2022  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Assets  
Shares in affiliated companies (FVOCI)  
1,580.2  
-
-
1,580.2  
1,580.2  
Other investments (FVOCI)  
38,864.2  
1,920.0  
-
36,944.2  
38,864.2  
Securities (FVOCI)  
8,116.7  
8,116.7  
-
-
8,116.7  
Securities (FVPL)  
26,774.8  
26,774.8  
-
-
26,774.8  
Derivatives designated as hedging instruments  
(cash flow hedge)  
512,188.6  
-
512,188.6  
-
512,188.6  
Derivatives designated as hedging instruments (fair  
value hedge)  
14,608.8  
-
14,608.8  
-
14,608.8  
Derivatives not designated as hedging instruments  
(FVPL)  
1,442,065.9  
-
1,442,065.9  
-
1,442,065.9  
Short-term investments (FVPL)  
159,604.0  
159,604.0  
-
-
159,604.0  
Total  
2,203,803.2  
196,415.5  
1,968,863.3  
38,524.4  
2,203,803.2  
Liabilities  
Derivatives designated as hedging instruments  
(cash flow hedge)  
422,366.9  
-
422,366.9  
-
422,366.9  
Derivatives designated as hedging instruments (fair  
value hedge)  
92,445.1  
-
92,445.1  
-
92,445.1  
Derivatives not designated as hedging instruments  
(FVPL)  
1,879,975.5  
-
1,879,975.5  
-
1,879,975.5  
Total  
2,394,787.5  
-
2,394,787.5  
-
2,394,787.5  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
211  
Consolidated Financial Statements Notes  
Measurement  
on the basis  
of inputs  
Measurement  
observable  
Other  
at market  
on the  
measurement  
Carrying  
prices  
market  
methods  
Total fair  
amount  
Level 1  
Level 2  
Level 3  
value  
30.09.2021  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Assets  
Shares in affiliated companies (FVOCI)  
1,580.7  
-
-
1,580.7  
1,580.7  
Other investments (FVOCI)  
29,255.3  
1,938.5  
-
27,316.8  
29,255.3  
Securities (FVOCI)  
12,631.5  
12,631.5  
-
-
12,631.5  
Securities (FVPL)  
31,109.0  
31,109.0  
-
-
31,109.0  
Derivatives designated as hedging instruments  
(cash flow hedge)  
211,765.5  
-
211,765.5  
-
211,765.5  
Derivatives designated as hedging instruments (fair  
value hedge)  
5,412.4  
-
5,412.4  
-
5,412.4  
Derivatives not designated as hedging instruments  
(FVPL)  
154,524.1  
-
154,524.1  
-
154,524.1  
Short-term investments (FVPL)  
19,959.2  
19,959.2  
-
-
19,959.2  
Total  
466,237.7  
65,638.2  
371,702.0  
28,897.5  
466,237.7  
Liabilities  
Derivatives designated as hedging instruments  
(cash flow hedge)  
179,434.5  
-
179,434.5  
-
179,434.5  
Derivatives designated as hedging instruments (fair  
value hedge)  
9,986.3  
-
9,986.3  
-
9,986.3  
Derivatives not designated as hedging instruments  
(FVPL)  
153,924.2  
-
153,924.2  
-
153,924.2  
Total  
343,345.0  
-
343,345.0  
-
343,345.0  
Level 3 financial instruments have developed as follows:  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Carrying amount as of 01.10.  
28,897.5  
27,568.1  
Gains (losses) – not recognised in profit or loss  
10,495.1  
1,160.6  
Additions  
20.0  
35.0  
Disposals  
-906.9  
-
Transfers  
-35.0  
-
Currency translation  
53.7  
133.8  
Carrying amount as of 30.09.  
38,524.4  
28,897.5  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
212  
Consolidated Financial Statements Notes  
The appreciation of EUR 10,495.1 thousand (previous year: EUR 1,923.7 thousand) relates to  
Other Investments (FVOCI). The fair value of these Other Investments is determined using a  
measurement method based on capitalisation of earnings. Essential input factors are the cash  
flow assumptions from planning and the discount rate. The impairment of other investments  
in the Czech Republic amounts to EUR 0.0 thousand (previous year: EUR 763.1 thousand).  
The resulting profit of EUR 10,495.1 thousand (previous year: EUR 1,160.6 thousand)  
through equity was recognised as other comprehensive income in the item “Change in value  
of investments and securities FVOCI”.  
An increase (reduction) of the cash flow assumptions by 25% would have resulted in an  
increase (reduction) of the OCI in the amount of EUR 6,878.5 thousand  
(EUR -6,878.5 thousand) (previous year: EUR 4,702.4 thousand (EUR -4,702.4 thousand)). An  
increase (reduction) of the discount rate by 50 basis points would have resulted in a reduction  
(increase) of the OCI in the amount of EUR -1,413.0 thousand (EUR 1,586.1 thousand)  
(previous year: EUR -1,116.1 thousand (EUR 1,278.2 thousand)).  
24.6.2.  
Valuation techniques and inputs used in measuring fair values  
In general, the fair values of the financial assets and liabilities correspond to their market  
prices on the reporting date. If active market prices are not directly available, then – if they  
are not of minor significance – they are calculated using recognised actuarial measurement  
models and current market parameters (in particular interest rates, exchange rates and the  
credit rating of contractual partners). This is done by discounting the cash flows from the  
financial instruments to the reporting date.  
The following valuation parameters and inputs were used:  
Financial instruments  
Level  
Valuation techniques  
Inputs  
Other investments  
3
Capital value-oriented  
Assumptions concerning cash flows, interest rates, planning  
Listed securities, mutual funds  
1
Market value-oriented  
Nominal values, stock market price, net asset value  
Listed energy futures  
1
Market value-oriented  
Settlement price determined at stock exchange  
Forward price curve derived from stock exchange prices,  
Non-listed energy forwards  
2
Capital value-oriented  
interest rate curve, credit risk of contractual partners on a  
net basis  
Cash flows already fixed or determined using forward rates,  
Interest rate swaps  
2
Capital value-oriented  
interest rate curve, credit risk of contractual partners  
Cash flows already fixed or determined using forward rates,  
Gas and gas-oil swaps  
2
Capital value-oriented  
interest rate curve, credit risk of contractual partners  
24.6.3.  
Fair values of financial assets and liabilities that are not measured regularly at  
fair value, however for which the fair value must be disclosed  
The items trade receivables, receivables from affiliated companies, receivables from joint  
arrangements and associated companies, other financial assets, as well as fixed term deposits  
and current investments are characterised by predominantly short remaining terms. This  
means that their carrying amounts as of the reporting date roughly represent their fair value.  
If they are material and have a fixed interest rate, then the fair value of non-current lendings  
corresponds to the present value of the payments associated with the assets, taking into  
consideration the current market parameters in each case (interest rates, credit spreads).  
Trade payables, liabilities to affiliated companies, liabilities to joint arrangements and  
associated companies and other financial liabilities usually have short remaining terms. The  
values on the balance sheet are approximately the fair values. If they are material and bear  
interest at a fixed rate, the fair value of financial liabilities is determined using the present  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
213  
Consolidated Financial Statements Notes  
value of the payments associated with the liabilities, taking into consideration the respectively  
applicable market parameters (interest rates, credit spreads).  
The following financial assets and liabilities have a fair value different from the carrying  
amount:  
Carrying  
Carrying  
amount  
Fair value  
amount  
Fair value  
Category acc.  
30.09.2022  
30.09.2022  
30.09.2021  
30.09.2021  
to IFRS 9  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Level  
Assets  
Other financial  
assets  
91,935.8  
90,641.9  
11,730.7  
12,521.0  
Lendings to  
companies in  
which an interest  
is held  
AC  
84,315.6  
83,089.7  
5,186.4  
5,847.9  
Level 3  
Other lendings  
AC  
7,620.2  
7,552.2  
6,544.3  
6,673.1  
Level 3  
Liabilities  
Financial  
liabilities  
536,218.5  
469,228.2  
548,817.6  
607,949.5  
Bonds  
FLAC  
300,896.3  
309,045.0  
301,231.8  
344,823.0  
Level 1  
Other financial  
liabilities  
FLAC  
235,322.2  
160,183.2  
247,585.8  
263,126.5  
Level 3  
The fair values of the Level 3 financial assets and liabilities disclosed above were determined  
in agreement with generally accepted valuation techniques based on discounted cash flow  
analyses. Material input is the discount rate, which takes into account the expected credit loss  
of the counterparty.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
214  
Consolidated Financial Statements Notes  
24.7.  
Net result  
The net result from financial instruments is grouped in the different classes of financial  
instruments as follows:  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Financial Assets at Amortized Cost  
461.1  
760.2  
Financial Assets at Fair Value through Other Comprehensive Income  
7,186.0  
5,740.3  
Financial Assets at Fair Value through Profit or Loss  
-5,054.8  
936.0  
Financial Assets/Liabilities at Fair Value through Profit or Loss  
4,595.0  
4,733.3  
Financial Liabilities Measured at Amortized Cost  
-21,630.1  
-18,273.6  
Net result  
-14,442.8  
-6,103.8  
Interest income and expenses from financial instruments measured at amortised costs:  
Total interest income  
928.1  
753.7  
Total interest expense  
-21,630.1  
-18,273.6  
The net result for the category Financial Assets at Amortized Cost (AC) mainly includes  
interest income from invested money and is recognised in the financial result. This item also  
includes income from the reversal of impairments and expected credit losses, income from  
the receipt of receivables that had previously been written off, as well as expenses from  
impairments, expected credit losses and write-offs for trade receivables recognised in the  
operating result.  
The net result of the category Financial Assets at Fair Value through Other Comprehensive  
Income (FVOCI) shows the measurement result for the investments and securities measured  
outside of profit or loss. Income from investments and dividends from securities are reported  
in the other financial result.  
The net result of the category Financial Assets at Fair Value through Profit or Loss (FVPL)  
mainly includes earnings from remeasurement and earnings from disposals, as well as  
dividends from securities and income from the remeasurement of money market funds and is  
shown in other financial result.  
The net result of the category Financial Assets at Fair Value Trading through Profit or Loss  
(FVPL) and Financial Liabilities at Fair Value Trading through Profit or Loss (FVPL) essentially  
results from the derivatives used by Energie AG. The measured value of derivative instruments  
in the Energy Segment is recognised in the operating result.  
The net result of the category Financial Liabilities at Amortized Cost mainly includes interest  
expenses from financial liabilities and is part of the financial result.  
24.8.  
Financial risk management  
24.8.1.  
Principles of financial risk management  
Due to its business activities and the financial transactions it conducts, the Energie AG Group  
is exposed to various risks. These risks primarily include currency and interest rate risks,  
liquidity risks, expected credit loss, price risks from securities, and price risks in the commodity  
sector (energy sector price risks).  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
215  
Consolidated Financial Statements Notes  
Energy sector risks are managed by Energie AG Oberösterreich Trading GmbH, and financial  
risks are managed centrally by Group Treasury, which is also responsible for any hedging  
measures for all Group companies. Hedging against energy sector risks is handled on the  
basis of an internal policy on conducting energy sector hedging transactions. A financial  
management guideline for the Group (Treasury Policy), in which the main goals, principles  
and distribution of duties in the Group are set out, serves as a basis for the management of  
financial risks.  
Hedging against energy sector and financial risks is also handled using derivative financial  
instruments. Transactions of this type are on principle only carried out with counterparties  
with very good credit ratings in order to minimise the risk of default.  
24.8.2.  
Foreign exchange risk  
The foreign exchange risks in the Energie AG Group result from funding provided in foreign  
currencies and the translation risk from the conversion of foreign Group companies into the  
Group currency (Czech Republic and Hungary).  
For the foreign exchange risk of financial instruments, sensitivity analyses were carried out  
which show the effects of hypothetical changes in exchange rates on result (after taxes) and  
equity. The affected holdings as of the reporting date were used as a basis (CZK 7.2 million,  
HUF 2.7 billion), (previous year: CZK 7.4 million, HUF 2.7 billion). Here it was assumed that  
the risk on the reporting date basically represents the risk during the fiscal year. A tax rate of  
23% to 24.25% (previous year: 25%) was used. In addition, it was assumed for the analysis  
that all other variables, in particular interest rates, remain constant. In the analysis, the  
currency risks for financial instruments that are denominated in a currency different from the  
functional currency and are of a monetary nature were included. Differences resulting from  
the exchange rate in translating financial statements into the Group currency were not taken  
into consideration.  
Following the aforementioned assumptions, an upward revaluation of the Euro by 10%  
against all other currencies on the reporting date would result in lower earnings (after taxes)  
by EUR 467.2 thousand (previous year: EUR 530.3 thousand) and a reduction in equity by  
EUR 467.2 thousand (previous year: EUR 530.3 thousand). Here, the sensitivity of equity, as  
well as the sensitivity of profit (after taxes), were affected by the sensitivity of the currency-  
related translation effects of net investments and hedge accounting in the amount of  
EUR 0.0 thousand (previous year: EUR 0.0 thousand).  
Following the aforementioned assumptions, a write-down of the Euro by 10% against all  
other currencies on the reporting date would result in increased earnings (after taxes) by  
EUR 571.0 thousand (previous year: EUR 648.1 thousand) and an increase in equity by  
EUR 571.0 thousand (previous year: EUR 648.1 thousand). Here, the sensitivity of equity, as  
well as the sensitivity of profit (after taxes), were affected by the sensitivity of the currency-  
related translation effects of net investments and hedge accounting in the amount of  
EUR 0.0 thousand (previous year: EUR 0.0 thousand).  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
216  
Consolidated Financial Statements Notes  
24.8.3.  
Interest rate risk  
The Energie AG Group holds interest rate-sensitive financial instruments in order to meet the  
requirements of operational and strategic liquidity management. Interest rate change risks  
mainly result from financial instruments with variable interest rates (cash flow risk). Interest  
rate risks result in particular from:  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
Cash in bank  
929,333.2  
219,197.3  
Variable rate lendings  
15,054.9  
2,595.4  
Variable rate loans  
-32,897.3  
-33,179.8  
Variable rate lease liabilities  
-74,610.2  
-78,370.6  
Net risk before hedge accounting  
836,880.6  
110,242.3  
Hedge accounting and interest rate derivatives  
68,924.7  
72,028.0  
Net risk after hedge accounting and interest derivatives  
905,805.3  
182,270.3  
For the interest rate risks of these financial instruments, sensitivity analyses were carried out  
which show the effects of hypothetical changes in market interest rates on result (after taxes)  
and equity. The affected holdings as of the reporting date were used as a basis. Here it was  
assumed that the risk on the reporting date basically represents the risk during the fiscal year.  
A tax rate of 23% to 24.25% (previous year: 25%) was used. In addition, it was assumed for  
the analysis that all other variables, in particular exchange rates, remain constant.  
Following the aforementioned assumptions, an increase in the market interest rate by 50  
basis points on the reporting date would result in increased earnings (after taxes) by  
EUR 3,424.5 thousand (previous year: EUR 683.5 thousand) and an increase in equity in the  
amount of EUR 6,370.4 thousand (previous year: EUR 5,327.4 thousand). The sensitivity of  
equity, as well as the sensitivity of earnings (after taxes), were in this case affected by the  
sensitivity of the interest rate-related cash flow hedge reserve in the amount of  
EUR 2,945.9 thousand (previous year: EUR 4,643.9 thousand).  
Following the aforementioned assumptions, a decrease in the market interest rate by 50 basis  
points on the reporting date would result in a reduction of earnings (after taxes) by  
EUR 3,424.5 thousand (previous year: increase: EUR 683.5 thousand) and a decrease in equity  
in the amount of EUR 6,588.7 thousand (previous year: EUR 5,713.6 thousand). The  
sensitivity of equity, as well as the sensitivity of earnings (after taxes), were in this case  
affected by the sensitivity of the interest rate-related cash flow hedge reserve in the amount  
of EUR 3,164.2 thousand (previous year: EUR 5,030.1 thousand).  
24.8.4.  
Commodity price risk  
Commodity price risks arise primarily from the procurement and sale of electricity, gas and  
CO2. Beyond that price risks arise for Energie AG Oberösterreich due to speculative positions  
taken in proprietary trading. Proprietary trading is only carried out within very tightly defined  
limits and the risk can therefore be considered immaterial.  
Hedging instruments are used for electrical energy, gas and CO2 to hedge against energy  
industry risks.  
For the commodity price risks, sensitivity analyses were carried out which show the effect of  
hypothetical changes in the fair value level on result (after taxes) and equity. The affected  
derivative holdings in the area of energy as of the reporting date were used as a basis. Here it  
was assumed that the risk on the reporting date basically represents the risk during the fiscal  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
217  
Consolidated Financial Statements Notes  
year. A tax rate of 23% to 24.25% (previous year: 25%) was used. In addition, it was  
assumed for the analysis that all other variables, in particular exchange rates, remain  
constant. Not taken into consideration are contracts which are for the purpose of the receipt  
or delivery of non-financial items according to the expected purchase, sale and use  
requirements of the company (own use) and which therefore are not to be reported  
according to IFRS 9, with the exception of onerous contacts.  
Sensitivity of derivative contracts regarding the electricity price:  
Following the aforementioned assumptions, a 50% (previous year: 15%) increase (decrease)  
in the fair value level as of the reporting date would result in a decrease (increase) in profit  
(after taxes) by EUR 0.0 thousand (previous year: EUR 55.4 thousand) and an increase  
(decrease) in equity by EUR 324,145.1 (previous year: EUR 8,380.9 thousand). The sensitivity  
of equity, as well as the sensitivity of earnings (after taxes), were in this case affected by the  
sensitivity of the electricity-price-related cash flow hedge reserve in the amount of  
EUR 324,145.1 thousand (previous year: EUR 8,436.3 thousand).  
Sensitivity of derivative contracts with regard to the prices for gas and diesel (gas-oil):  
Following the aforementioned assumptions, a 50% (previous year: 25%) increase (decrease)  
in the fair value level as of the reporting date would result in a decrease (increase) in profit  
(after taxes) by EUR 0.0 thousand (previous year: EUR 466.8 thousand) and an increase  
(decrease) in equity by EUR 45,700.5 thousand (previous year: EUR 11,265.2 thousand). The  
sensitivity of equity, as well as the sensitivity of earnings (after taxes), were in this case  
affected by the sensitivity of the gas-price-related cash flow hedge reserve in the amount of  
EUR 45,700.5 thousand (previous year: EUR 11,732.0 thousand).  
Sensitivity of derivative contracts with regard to the price of CO2:  
Following the aforementioned assumptions, a 30% (previous year: 15%) increase (decrease)  
in the fair value level as of the reporting date would result in a decrease (increase) in profit  
(after taxes) by EUR 306.6 thousand (previous year: EUR 55.5 thousand) and an increase  
(decrease) in equity by EUR 2,210.6 thousand (previous year: decrease (increase)  
EUR 6,823.7 thousand). The sensitivity of equity, as well as the sensitivity of earnings (after  
taxes), were in this case affected by the sensitivity of the CO2-price-related cash flow hedge  
reserve in the amount of EUR 2,517.2 thousand (previous year: EUR 6,879.2 thousand).  
24.8.5.  
Market risk from securities measured at fair value  
The Energie AG Oberösterreich Group holds securities and funds that result in price change  
risks for the company. The fluctuation risk of the securities held is limited by a conservative  
investment policy and ongoing monitoring, as well as ongoing quantification of the risk  
potential.  
A sensitivity analysis carried out for the price risks from securities established the effect of  
hypothetical changes in the market price level on earnings (after taxes) and equity. The  
relevant holdings of financial instruments “At Fair Value through Other Comprehensive  
Income” and “At Fair Value through Profit or Loss” on the reporting date were used as a  
basis. Here it was assumed that the risk on the reporting date basically represents the risk  
during the fiscal year. A tax rate of 23% to 24.25% (previous year: 25%) was used. In  
addition, it was assumed for the analysis that all other inputs, such as the currency, remain  
constant.  
Following the aforementioned assumptions, a 15% increase (decrease) in the fair value level  
as of the reporting date would result in an increase (decrease) in profit (after taxes) in the  
amount of EUR 21,227.5 thousand (previous year: EUR 5,745.2 thousand) and in equity in  
the amount of EUR 22,386.7 thousand (previous year: EUR 7,384.3 thousand). Here, the  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
218  
Consolidated Financial Statements Notes  
sensitivity of equity, as well as the sensitivity of profit (after taxes), were affected by the  
sensitivity of the market-price-level-related OCI reserve in the amount of  
EUR 1,159.2 thousand (previous year: EUR 1,639.1 thousand).  
24.8.6.  
Expected credit loss  
Credit risks arise for the Energie AG Group due to non-fulfilment of contractual  
arrangements by counterparties.  
The expected credit loss is limited by performing regular credit assessments of the customer  
portfolio. In the area of financial and energy trading, transactions are only conducted with  
counterparties with a first-class credit rating. In addition, the risks are mitigated by limit  
systems and monitoring.  
At Energie AG Oberösterreich, the maximum expected credit loss corresponds to the carrying  
amount of the reported financial assets.  
A low credit risk is assumed for derivatives and other instruments accounted for at fair value.  
Netting agreements are used to reduce the credit risks attached to derivatives.  
The carrying amounts of the financial assets are composed as follows:  
Thereof:  
Thereof: neither impaired nor past due in the following  
not  
maturity ranges  
Thereof:  
impaired  
not  
or overdue  
impaired  
Carrying  
as of the  
as of the  
amount  
reporting  
Less than  
Between  
Between More than  
reporting  
30.09.2022  
date  
30 days 30 and 60 days 60 and 90 days  
90 days  
date  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Receivables and other  
financial assets (non-current  
and current)  
793,420.9  
775,262.5  
11,945.0  
737.0  
622.6  
745.4  
4,108.4  
Trade receivables  
351,991.7  
336,341.9  
11,906.4  
570.4  
622.4  
722.6  
1,828.0  
Receivables from joint  
arrangements and associated  
companies  
37,325.3  
37,306.5  
18.8  
-
-
-
-
Other financial assets  
404,103.9  
401,614.1  
19.8  
166.6  
0.2  
22.8  
2,280.4  
Total  
793,420.9  
775,262.5  
11,945.0  
737.0  
622.6  
745.4  
4,108.4  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
219  
Consolidated Financial Statements Notes  
Thereof:  
Thereof: neither impaired nor past due in the following  
not  
maturity ranges  
Thereof:  
impaired  
not  
or overdue  
impaired  
Carrying  
as of the  
as of the  
amount  
reporting  
Less than  
Between  
Between More than  
reporting  
30.09.2021  
date  
30 days 30 and 60 days 60 and 90 days  
90 days  
date  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Receivables and other  
financial assets (non-current  
and current)  
382,412.7  
366,297.5  
9,734.4  
852.2  
526.8  
640.3  
4,361.5  
Trade receivables  
259,902.2  
247,042.5  
9,709.6  
674.3  
526.6  
606.3  
1,342.9  
Receivables from joint  
arrangements and associated  
companies  
5,076.8  
5,069.0  
7.8  
-
-
-
-
Other financial assets  
117,433.7  
114,186.0  
17.0  
177.9  
0.2  
34.0  
3,018.6  
Total  
382,412.7  
366,297.5  
9,734.4  
852.2  
526.8  
640.3  
4,361.5  
The changes in impairments of financial assets were as follows:  
Balance  
Balance  
as of  
Currency  
as of  
01.10.2021  
Additions  
Use  
Reversals  
conversion  
30.09.2022  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Receivables and other financial assets (non-  
current and current)  
8,556.3  
665.8  
-276.1  
-1,066.1  
32.0  
7,911.9  
Trade receivables  
8,472.2  
665.8  
-276.1  
-1,065.9  
29.0  
7,825.0  
Other financial assets  
84.1  
-
-
-0.2  
3.0  
86.9  
Total  
8,556.3  
665.8  
-276.1  
-1,066.1  
32.0  
7,911.9  
Balance  
Balance  
as of  
Currency  
as of  
01.10.2020  
Additions  
Use  
Reversals  
conversion  
30.09.2021  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Receivables and other financial assets (non-  
current and current)  
9,051.9  
713.4  
-77.6  
-1,203.1  
71.7  
8,556.3  
Trade receivables  
8,973.1  
713.4  
-77.6  
-1,203.1  
66.4  
8,472.2  
Other financial assets  
78.8  
-
-
-
5.3  
84.1  
Total  
9,051.9  
713.4  
-77.6  
-1,203.1  
71.7  
8,556.3  
The expenses for complete derecognition of receivables amount to EUR 1,380.7 thousand  
(previous year: EUR 1,589.8 thousand). The income from the receipt of derecognised  
receivables amount to EUR 530.0 thousand (previous year: EUR 590.2 thousand). The income  
from impairment reversals in the fiscal year amounts to EUR 400.3 thousand (previous year:  
EUR 489.7 thousand) for financial assets classified as “Financial Assets at Amortized Cost  
(AC)”.  
With regard to the holdings of financial trade and other receivables that are neither impaired  
nor in default, there are no indications as of the reporting date that the debtors will not meet  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
220  
Consolidated Financial Statements Notes  
their payment obligations. For the financial assets not listed in the above table, there are no  
material delinquencies or impairments at the reporting date, and there are no indications that  
the debtors will not meet their payment obligations.  
Individual impairments are made up of a number of individual items, of which none is  
material when considered by itself. In addition, value adjustments graduated by risk groups  
are recognised to provide for general credit risks. An impairment of 50% is usually recognised  
for trade receivables that are more than 180 days overdue.  
A financial asset is considered a write-off if the debtor is unlikely to meet his obligations. This  
is in particular assumed if insolvency proceedings are opened or a claim is overdue for a long  
time.  
Pursuant to the expected credit loss model described in IFRS 9, expected credit losses must  
also be recognised for financial assets “At Amortised Cost” (AC). The expected credit losses  
developed as follows:  
Balance  
Currency  
as of  
01.10.2021  
Additions  
Reversals  
conversion  
30.09.2022  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Other financial assets  
206.8  
33.8  
-159.8  
0.4  
81.2  
Lendings to companies in which an  
interest is held  
18.7  
33.8  
-0.8  
-
51.7  
Other lendings  
35.3  
-
-6.2  
0.4  
29.5  
Fixed term deposits  
152.8  
-
-152.8  
-
-
Receivables and other financial  
assets (non-current and current)  
501.0  
232.7  
-37.7  
0.4  
696.4  
Trade receivables  
501.0  
232.7  
-37.7  
0.4  
696.4  
Fixed term deposits and short-  
term investments  
183.9  
-
-52.5  
-
131.4  
Fixed term deposits  
183.9  
-
-52.5  
-
131.4  
Total  
891.7  
266.5  
-250.0  
0.8  
909.0  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
221  
Consolidated Financial Statements Notes  
Balance  
Currency  
as of  
01.10.2020  
Additions  
Reversals  
conversion  
30.09.2021  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Other financial assets  
57.3  
159.3  
-10.7  
0.9  
206.8  
Lendings to companies in which an  
interest is held  
24.0  
-
-5.3  
-
18.7  
Other lendings  
33.3  
6.5  
-5.4  
0.9  
35.3  
Fixed term deposits  
-
152.8  
-
-
152.8  
Receivables and other financial  
assets (non-current and current)  
1,123.1  
23.6  
-649.0  
3.3  
501.0  
Trade receivables  
1,123.1  
23.6  
-649.0  
3.3  
501.0  
Fixed term deposits and short-  
term investments  
223.7  
-
-39.8  
-
183.9  
Fixed term deposits  
223.7  
-
-39.8  
-
183.9  
Total  
1,404.1  
182.9  
-699.5  
4.2  
891.7  
For trade receivables and receivables from subsidiaries that are essentially comprised of trade  
receivables, the credit losses expected over the term are measured using an impairment  
matrix. In the case of lendings, fixed term deposits, cash and cash equivalents, the expected  
credit losses are assessed for a 12-month period due to the credit risk remaining essentially  
unchanged, or because a low credit risk is assumed on the basis of the counterparty’s current  
rating. Any change in the credit risk is ascertained by monitoring the rating. For the purpose  
of reflecting an assumed recovery rate, the expected losses include the Loss Given Default  
(LGD), unless the instrument is of diminished creditworthiness. The estimated losses are in  
this case ascertained on the basis of the estimated expected cash flows and the originally  
effective interest rate.  
In the previous fiscal year, the rating of one particular long-term investment with one  
Austrian bank pursuant to IFRS 9B.5.5.23 deteriorated to “non-investment grade”. This has  
significantly increased the expected credit loss since the investment’s initial recognition. The  
loss expected for this long-term fixed deposit was thus measured over the remaining term  
and amounted to EUR 107.8 thousand. It is reported in the item other financial assets and  
included in the addition of EUR 152.8 thousand. The 12-month credit loss is again applied in  
the present fiscal year.  
24.8.7.  
Liquidity risk  
A liquidity risk would exist when liquidity reserves or debt capacity were insufficient to meet  
financial obligations on time. Due to anticipatory liquidity planning and the liquidity reserves  
that are held, the liquidity risk is considered very low for the Energie AG Group. In addition,  
open lines of bank credit and on the capital market are also drawn on as sources for  
financing. Measures aimed at assuring an appropriate capital structure and a conservative  
financial profile assist the company in maintaining its current “A” rating.  
All financial instruments held on the reporting date and for which payments are contractually  
agreed upon are consolidated. Plan figures for new, future financial liabilities are not  
included. An average remaining term of 12 months is assumed for the current operating  
loans; the loan terms are however extended regularly and are, from a commercial perspective,  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
222  
Consolidated Financial Statements Notes  
available for longer than the stated periods. Foreign currency amounts are translated at the  
spot rate as of the reporting date. Variable interest payments from financial instruments are  
determined based on the last interest rates set before the reporting date. Financial liabilities  
that can be repaid at any time are always assigned to the earliest maturity range.  
Cash flows  
Cash flows  
Cash flows  
Carrying  
2022/2023  
2023/2024 to 2026/2027  
from 2027/2028  
amount  
30.09.2022  
Interest Repayments  
Interest Repayments  
Interest Repayments  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Financial liabilities (non-  
current and current)  
660,478.2  
20,011.0  
49,342.0  
49,797.9  
335,725.5  
55,080.2  
276,599.5  
Bonds  
300,896.3  
13,500.0  
-
27,000.0  
301,328.3  
-
-
Liabilities to banks  
8,362.7  
280.0  
2,746.8  
413.4  
2,028.7  
530.9  
3,587.2  
Lease liabilities  
115,897.0  
1,560.4  
45,241.2  
5,384.8  
12,690.1  
10,561.6  
57,965.7  
Other financial liabilities  
235,322.2  
4,670.6  
1,354.0  
16,999.7  
19,678.4  
43,987.7  
215,046.6  
Trade payables (current)  
279,156.4  
-
279,156.4  
-
-
-
-
Derivative financial  
instruments (non-current and  
current)  
2,946,453.5  
1,569.9 1,815,628.6  
1,559.7 1,128,351.2  
1,133.6  
-
Derivatives designated as  
hedging instruments (cash flow  
hedge)  
422,366.9  
1,569.9  
343,740.4  
1,559.7  
76,152.8  
1,133.6  
-
Derivatives designated as  
hedging instruments (fair value  
hedge)  
92,445.1  
-
19,632.9  
-
72,812.2  
-
-
Derivatives not designated as  
hedging instruments  
1,879,975.5  
-
1,105,237.2  
-
774,738.3  
-
-
Received margin payments  
551,666.0  
-
347,018.1  
-
204,647.9  
Other liabilities (non-current  
and current) acc. to the  
Statement of Financial  
Position  
466,461.6  
Thereof non-financial  
liabilities  
216,518.3  
Thereof financial liabilities  
249,943.3  
-
246,007.3  
-
3,602.7  
-
333.3  
Liabilities to affiliated  
companies  
560.7  
-
560.7  
-
-
-
-
Liabilities to joint arrangements  
and associated companies  
5,357.5  
-
5,357.5  
-
-
-
-
Other financial liabilities (non-  
current and current)  
244,025.1  
-
240,089.1  
-
3,602.7  
-
333.3  
Total  
4,136,031.4  
21,580.9 2,390,134.3  
51,357.6 1,467,679.4  
56,213.8  
276,932.8  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
223  
Consolidated Financial Statements Notes  
Cash flows  
Cash flows  
Cash flows  
Carrying  
2021/2022  
2022/2023 to 2025/2026  
from 2026/2027  
amount  
30.09.2021  
Interest Repayments  
Interest Repayments  
Interest Repayments  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Financial liabilities (non-  
current and current)  
670,096.9  
18,319.7  
21,127.2  
59,446.1  
376,518.1  
51,566.7  
273,897.2  
Bonds  
301,231.8  
13,500.0  
-
40,500.0  
301,842.2  
-
-
Liabilities to banks  
6,530.5  
123.4  
382.7  
442.5  
2,111.4  
644.7  
4,036.4  
Lease liabilities  
114,748.8  
231.4  
7,555.4  
1,317.9  
52,396.2  
2,707.6  
54,797.2  
Other financial liabilities  
247,585.8  
4,464.9  
13,189.1  
17,185.7  
20,168.3  
48,214.4  
215,063.6  
Trade payables (current)  
162,178.9  
-
162,178.9  
-
-
-
-
Derivative financial  
instruments (non-current and  
current)  
517,384.3  
2,665.2  
428,978.8  
6,734.4  
77,292.3  
3,980.2  
-
Derivatives designated as  
hedging instruments (cash flow  
hedge)  
179,434.5  
2,665.2  
117,063.1  
6,734.4  
51,258.2  
3,980.2  
-
Derivatives designated as  
hedging instruments (fair value  
hedge)  
9,986.3  
-
6,522.8  
-
3,463.5  
-
-
Derivatives not designated as  
hedging instruments  
153,924.2  
-
131,353.6  
-
22,570.6  
-
-
Received margin payments  
174,039.3  
-
174,039.3  
-
-
-
-
Other liabilities (non-current  
and current) acc. to the  
Statement of Financial  
Position  
231,417.6  
Thereof non-financial  
liabilities  
150,359.7  
Thereof financial liabilities  
81,057.9  
-
77,061.4  
-
3,621.9  
-
374.6  
Liabilities to affiliated  
companies  
9,292.5  
-
9,292.5  
-
-
-
-
Liabilities to joint arrangements  
and associated companies  
2,774.3  
-
2,774.3  
-
-
-
-
Other financial liabilities (non-  
current and current)  
68,991.1  
-
64,994.6  
-
3,621.9  
-
374.6  
Total  
1,430,718.0  
20,984.9  
689,346.3  
66,180.5  
457,432.3  
55,546.9  
274,271.8  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
224  
Consolidated Financial Statements Notes  
24.9.  
Development and terms of the most material financial liabilities  
EUR 1,000  
Financial liabilities 30.09.2021  
Non-current  
648,969.7  
Current  
21,127.2  
670,096.9  
Registered bond 2022–2051  
9,377.1  
Other registered bonds  
-8,628.1  
Other changes in financial liabilities  
-10,367.7  
Financial liabilities 30.09.2022  
Non-current  
611,136.2  
Current  
49,342.0  
660,478.2  
The Group issued the following material funding:  
Energie AG Oberösterreich:  
4.5% Energie AG OOe. Bond 2005-25 ISIN: XS0213737702 volume: EUR 300,000,000  
coupon: 4 March.  
Registered bond 2010-2030, 4.75%, Volume: EUR 40,000,000  
Registered bond 2020-2040, 1.25%, Volume: EUR 100,000,000  
Registered bond 2021-2051, 1.386%, Volume: EUR 65,000,000  
25.  
Non-current provisions  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
Provisions for pensions  
80,419.7  
113,863.5  
Provisions for severance payments  
77,068.3  
95,855.4  
Provisions for anniversary bonuses  
18,278.7  
22,982.4  
Provisions for stepped pension and early retirement benefits  
8,401.7  
13,680.0  
Other provisions  
43,561.6  
47,429.6  
227,730.0  
293,810.9  
For the most part, the provisions for pensions, severance payments and anniversary bonuses  
have a term that is more than five years. The provision for stepped pension and early  
retirement benefits will lead to payment outflows within the next five fiscal years, for the  
most part.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
225  
Consolidated Financial Statements Notes  
The following assumptions were made in calculating the personnel provisions:  
2021/2022  
2020/2021  
%
%
Discount rate  
4.0  
0.8  
Salary trend  
3.5  
2.9  
Pension trend  
2.25-3.5  
2.0  
Expected return on plan assets  
4.0  
0.8  
Biometric calculations were based on the AVÖ 2018 P calculation principles for pension funds  
from the Actuarial Association of Austria. The statutory retirement age was used as a basis.  
A fluctuation ranging from 0.00% to 12.69% (previous year: 0.00% to 12.12%) is assumed,  
staggered according to length of service with the company.  
25.1.  
Provisions for pensions and similar provisions  
Company agreements and commitments under individual contracts have incurred an  
obligation to pay pensions upon retirement to certain staff members who joined the  
company prior to 30 September 1996 and have accepted neither full nor partial  
compensation of their claims to direct payments. Beyond that, there is an obligation to pay  
pensions to certain staff members who retired before 1 July 1998.  
For this group of people, a pension provision has been created in line with IAS 19 (Employee  
Benefits) using the projected unit credit method of actuarial valuation.  
The Group has an obligation to make additional contributions for defined retirement benefit  
obligations that were transferred to the Group’s pension fund.  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Present value of retirement benefit obligations (DBO)  
as of 01.10.  
127,826.1  
130,659.1  
+ Current service costs  
491.1  
498.9  
+ Interest expense  
1,002.6  
1,250.5  
- Retirement benefits payments  
-7,194.2  
-7,217.8  
(-)/+ Remeasurement – actuarial (gains)/losses:  
Due to experience adjustments  
7,744.8  
-572.7  
Due to changes in demographic assumptions  
-13.5  
1.0  
Due to changes in financial assumptions  
-36,325.5  
3,207.1  
Present value of retirement benefit obligations (DBO)  
as of 30.09.  
93,531.4  
127,826.1  
- Fair value of fund assets  
-13,111.7  
-13,962.6  
Recognised pension provisions as of 30.09.  
80,419.7  
113,863.5  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
226  
Consolidated Financial Statements Notes  
Changes in fund assets  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Plan assets as of 01.10.  
13,962.6  
13,610.3  
+/(-) Interest income/(expenses) for plan assets  
117.9  
122.7  
+ Contributions to fund  
94.0  
182.1  
- Payments from fund  
-1,164.2  
-1,145.4  
+/(-) Asset gain/(loss)  
101.4  
1,192.9  
Plan assets as of 30.09.  
13,111.7  
13,962.6  
The actual income from the plan assets amounts to EUR -270.6 thousand (previous year:  
EUR 1,008.8 thousand).  
The composition of the fund’s assets presents as follows:  
30.09.2022  
30.09.2021  
%
%
Shares  
39.0  
39.2  
Bonds  
30.5  
40.0  
Money market  
2.5  
7.8  
Other investments  
28.0  
13.0  
Total  
100.0  
100.0  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Current service costs  
491.1  
498.9  
Net interest expense  
884.7  
1,127.8  
Pension expense (recognised in net profit or loss for the period)  
1,375.8  
1,626.7  
Remeasurement of retirement benefit obligations  
-28,695.6  
1,442.5  
Retirement benefits expense (recognised in other comprehensive income)  
-27,319.8  
3,069.2  
The present value of the defined retirement benefit obligations is distributed over the  
individual groups of employees entitled to pension benefits as follows:  
30.09.2022  
30.09.2021  
%
%
Active  
15.7  
16.5  
Vested  
0.5  
1.3  
Retired  
83.8  
82.2  
100.0  
100.0  
As of 30 September 2022, the weighted average remaining term of the defined benefit  
obligations was 10.0 years (previous year: 12.0 years).  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
227  
Consolidated Financial Statements Notes  
Pension payments for the 2022/2023 fiscal year are expected to amount to  
EUR 7,335.3 thousand.  
An increase or decrease in the material actuarial assumptions would have the following  
effects on the present value of the retirement benefit obligations:  
Sensitivity analyses  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
Remaining life expectancy  
Change by +1 year  
5,810.6  
9,272.0  
Change by -1 year  
-6,203.8  
-9,760.3  
Discount rate  
Change by +0.5%  
-5,262.2  
-7,709.2  
Change by -0.5%  
5,792.8  
8,617.8  
Future pension increase  
Change by +0.5%  
5,595.9  
8,134.8  
Change by -0.5%  
-5,154.0  
-7,409.3  
25.2.  
Provisions for severance payments  
Based on obligations according to Austrian law and collective bargaining agreements,  
severance payments were paid to employees who took up service by 31 December 2002.  
Benefits due at the time of retirement or severance are calculated on the basis of the last  
salary, as well as the number of years of employment.  
Based on these regulations according to labour law and collective bargaining agreements, a  
provision is created which is calculated according to the projected unit credit method.  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Present value of severance payment obligations (DBO)  
as of 01.10.  
95,855.4  
95,623.6  
+ Current service costs  
2,990.0  
3,092.3  
+/(-) (Gain)/loss on DBP due to termination benefit  
-364.2  
-
+ Interest expense  
742.5  
915.1  
- Severance payments  
-7,180.5  
-5,927.4  
(-)/+ Remeasurement – actuarial (gains)/losses:  
Due to experience adjustments  
2,329.8  
505.3  
Due to changes in demographic assumptions  
-135.2  
-40.5  
Due to changes in financial assumptions  
-17,169.5  
1,687.0  
Present value of severance payment obligations (DBO)  
as of 30.09. = reported provision for severance payment obligations as of 30.09.  
77,068.3  
95,855.4  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
228  
Consolidated Financial Statements Notes  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Current service costs  
2,625.8  
3,092.3  
Net interest expense  
742.5  
915.1  
Severance expenses (recognised in net profit or loss for the period)  
3,368.3  
4,007.4  
Remeasurement of the severance benefit obligation  
-14,974.9  
2,151.8  
Severance expenses (recognised in other comprehensive income)  
-11,606.6  
6,159.2  
As of 30 September 2022, the weighted average remaining term of the defined benefit  
obligations was 6.8 years (previous year: 8.2 years).  
Severance payments for the 2022/2023 fiscal year are expected to amount to  
EUR 9,786.8 thousand.  
An increase or decrease in the significant actuarial assumptions would have the following  
effects on the present value of the severance payment obligations:  
Sensitivity analyses  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
Discount rate  
Change by +0.5%  
-2,692.3  
-4,067.0  
Change by -0.5%  
2,868.1  
4,377.7  
Future salary increase  
Change by +0.5%  
2,910.5  
4,332.4  
Change by -0.5%  
-2,746.0  
-4,057.1  
For employment relationships in Austria commencing on or after 1 January 2003, the  
employer is liable to remit 1.53% of the gross salary to an employee pension fund. This form  
of severance payment is recognised as a defined contribution plans according to IAS 19  
(Employee Benefits).  
25.3.  
Provisions for anniversary bonuses  
Based on collective bargaining agreements, a provision for anniversary bonuses is created  
which is calculated according to the projected unit credit method.  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Present value of anniversary bonus obligation (DBO) as of 01.10.  
22,982.4  
22,448.2  
+ Current service costs  
1,376.5  
1,323.9  
+ Interest expense  
183.3  
223.1  
Anniversary bonus payments  
-1,595.3  
-1,677.5  
(-)/+ Remeasurement – actuarial (gains)/losses  
-4,668.2  
664.7  
Present value of anniversary bonus obligation (DBO)  
as of 30.09. = reported provisions for anniversary bonuses  
as of 30.09.  
18,278.7  
22,982.4  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
229  
Consolidated Financial Statements Notes  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Current service costs  
1,376.5  
1,323.9  
Net interest expense  
183.3  
223.1  
Remeasurement  
-4,668.2  
664.7  
Expenses for anniversary bonuses (recognised in net profit or loss for the period)  
-3,108.4  
2,211.7  
25.4.  
Provisions for stepped pension and early retirement benefits  
A stepped pension (early retirement model) has been agreed upon with certain employees.  
This is a transitional payment for the period between the early termination of the  
employment relationship and the time when a claim to legal pension benefits is reached. The  
transitional payments for this period correspond to a previously determined percentage of the  
previous salary.  
For the resulting obligations, a provision is created according to IAS 19 (Employee Benefits).  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Present value of early retirement obligations (DBO) as of 01.10.  
13,680.0  
21,572.2  
+ Interest expense  
84.6  
173.9  
+ Past service costs  
716.3  
573.5  
- Early retirement payments  
-5,424.9  
-7,358.5  
(-)/+ Remeasurement – actuarial (gains)/losses  
-654.3  
-1,281.1  
Present value of early retirement obligations (DBO)  
as of 30.09. = reported provisions for early retirement obligations as of 30.09.  
8,401.7  
13,680.0  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Past service costs  
716.3  
573.5  
Net interest expense  
84.6  
173.9  
Remeasurement  
-654.3  
-1,281.1  
Expenses for stepped pension and early retirement benefits (recognised in net profit  
or loss for the period)  
146.6  
-533.7  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
230  
Consolidated Financial Statements Notes  
25.5.  
Other non-current provisions  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Carrying amount as of 01.10.  
47,429.6  
33,777.4  
Use  
-207.0  
-63.6  
Reversal  
-2,375.3  
-137.3  
Allocation  
-7,151.9  
13,818.0  
Change in interest rate  
-8,454.7  
-
Translation differences  
17.1  
35.1  
43,561.6  
47,429.6  
This item predominantly contains provisions for landfills and provisions related to the  
operation of gas storage facilities.  
26.  
Construction cost subsidies  
This item primarily includes financing contributions received from electricity, gas and district  
heating customers. They are reversed as income over the average depreciation period for the  
corresponding equipment (up to 40 years). Impairments and reversals of impairment for these  
assets were proportionally considered in the construction cost subsidies.  
27.  
Advances received  
This item contains advances received from customers for services to be provided.  
28.  
Other non-current liabilities  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
Investment subsidies  
26,090.0  
27,302.4  
Other liabilities  
19,682.6  
21,247.1  
45,772.6  
48,549.5  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
231  
Consolidated Financial Statements Notes  
29.  
Current provisions  
Current provisions developed as follows during this fiscal year:  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Carrying amount as of 01.10.  
45,661.3  
20,684.1  
Use  
-14,937.8  
-7,359.2  
Reversal  
-4,771.7  
-723.8  
Allocation  
53,043.4  
32,996.0  
Translation difference  
38.3  
64.2  
79,033.5  
45,661.3  
This item mainly consists of provisions for the future performance of electricity and gas supply  
contracts, provisions for obligations from emissions allowances, and waste management  
costs.  
30.  
Tax provisions  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
Corporate tax for the reporting period  
176.6  
109.2  
31.  
Other current liabilities  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
Liabilities to non-consolidated affiliated companies  
543.2  
9,288.1  
Liabilities to joint arrangements and associated companies  
5,357.5  
2,774.3  
Tax liabilities  
34,063.0  
14,710.7  
Social-security liabilities  
6,562.9  
7,082.4  
Advances received  
37,612.0  
13,526.3  
Liabilities to employees  
60,972.7  
57,430.1  
Liabilities from collateral annexes  
211,670.0  
41,780.0  
Other liabilities  
63,907.7  
36,276.2  
420,689.0  
182,868.1  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
232  
Consolidated Financial Statements Notes  
32.  
Non-current assets held for sale  
The business activities of OÖ Landesholding GmbH and Energie AG Group in the  
telecommunications sector were consolidated during the reporting period. The aim of  
consolidation is to expand and provide comprehensive broadband internet in Upper Austria  
as well as to harness synergy effects.The business activities of OÖ Landesholding GmbH and  
Energie AG Group in the telecommunications sector were consolidated during the reporting  
period.  
As of 30 September 2021, the operational unit “Fiber to the home” (FTTH) was recognised in  
the item “Non-current assets held for sale” (Holding & Services Segment).  
30.09.2021  
EUR 1,000  
Assets  
Non-current assets  
Intangible assets  
171.0  
Property, plant and equipment  
99,000.0  
Other non-current assets  
23,001.2  
122,172.2  
Current assets  
Receivables  
47.9  
122,220.1  
Liabilities  
Non-current liabilities  
Deferred tax liabilities  
2,595.2  
Construction cost subsidies  
603.1  
Other non-current liabilities  
39,193.1  
42,391.4  
Current liabilities  
Trade payables  
445.5  
42,836.9  
The assets were essentially comprised of fibre-optic infrastructure and claims for subsidies.  
They were measured at amortised costs. The other non-current liabilities consisted of  
subsidies for fibre-optic infrastructure recognised as liabilities. There were also plans to  
allocate intra-Group liabilities of EUR 75.4 million to this operational unit.  
This operational unit was spun out into Breitband Oberösterreich Infrastruktur GmbH  
(formerly: OÖ Breitband Infrastruktur GmbH) as planned. The interest held in Breitband  
Oberösterreich Infrastruktur GmbH was transferred to BBOÖ Breitband Oberösterreich GmbH  
(formerly: Fiber Service OÖ GmbH), a subsidiary of OÖ Landesholding GmbH. BBOÖ  
Breitband Oberösterreich GmbH operates a company in the telecommunications sector. As a  
result of the restructuring, Energie AG Oberösterreich received a participating interest of 50%  
in BBOÖ Breitband Oberösterreich GmbH.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
233  
Consolidated Financial Statements Notes  
The assets and liabilities reported in the Consolidated Financial Statements as of  
30 September 2021 were deconsolidated without any changes. The Consolidated Financial  
Statements as of 30 September 2022 reports earnings from the disposal of EUR 37.0 million,  
which were determined in accordance with IAS 28.28, in the item “Other operating income”.  
The participating interest in BBOÖ Breitband Oberösterreich GmbH constitutes a joint venture  
as per IFRS 11 and is measured using the equity method. As of 30 September 2022, the  
carrying amount measured using the equity method was EUR 38.4 million.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
234  
Other explanatory notes  
OTHER EXPLANATORY NOTES  
33.  
Other obligations  
Pursuant to an energy supply agreement between Energie AG Oberösterreich Trading GmbH  
and VERBUND AG, the Group procures a certain annual amount of electricity on the basis of  
standard market products. The cost of the delivered electricity is recognised under material  
costs.  
34.  
Proposal for the appropriation of profit  
The Management Board of Energie AG Oberösterreich proposes to the Annual General  
Meeting a dividend of  
EUR 0.60 (previous year: EUR 0.75) per share, amounting to a total of EUR 53,191.1 thousand  
(previous year: EUR 66,489.4 thousand).  
35.  
Management of risks and opportunities  
35.1.  
Risk management process  
Due to the current developments in the energy industry and energy policy environment and  
the associated volatile situation on the energy markets, the industry as a whole and  
Energie AG as an industry player are facing numerous uncertainties. The aim of the risk  
management process is to identify these risks and opportunities at an early stage, to evaluate  
them and to derive suitable measures from them in order to minimise the risks and take  
advantage of opportunities in the best way possible. As an integral part of the management  
and control system, risk assessments support the management team and form part of the  
strategic and operational issues decision-making process.  
The established COSO II framework forms the basis for the Group-wide risk management  
process at Energie AG. The responsible business units follow a structured quarterly process to  
identify and evaluate risks, opportunities and measures and record them in a central software  
tool. The data collected is then analysed on Group-level and incorporated into the Group’s  
overall risk position.  
Reporting to the Group’s Management Board is done on a quarterly basis and ad hoc as  
required. The risk management report is an integral part of reporting to the Supervisory Board  
and is, in accordance with the requirements of the Austrian Company Law Amendment Act  
(URÄG), also submitted to the audit committee with respect to the efficiency and validity of  
the processes. The central management system assures proper documentation and  
verifiability.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
235  
Consolidated Financial Statements Notes  
35.2.  
Significant opportunities (+) | risks (-)1)and measures  
STRATEGIC OPPORTUNITIES | RISKS  
PROJECT OPPORTUNITIES | RISKS  
High, long-term investment costs, projects with a  
+|− Strategic opportunities | risks due to  
high level of complexity  
Changes in general climatic conditions  
Underruns and overshooting of the planned  
Extreme events and their consequences  
values in terms of timing schedule, project costs  
(periods of heat | drought, flooding, storms,  
and quality  
hail, forest fires, avalanches)  
(Energy) policy uncertainty  
Long-term changes in climatic and ecological  
Measures:  
conditions (precipitation frequency/volume,  
increase in average temperatures)  
Project management  
Changes in the general energy policy and energy  
Risk management methods in the entire project  
market environment  
cycle  
Changes in technological developments, in the  
Optimised contract arrangements  
market environment, in customer needs …  
Measures  
SUSTAINABILITY OPPORTUNITIES | RISKS  
Continuous intensive monitoring of energy policy  
In the medium term – in our 5-year planning horizon  
developments, markets, competitors, customers,  
– we assume that climate-related opportunities |  
the climate and technologies  
risks will remain within the statistical range of the  
Participation in research projects, …  
past few years, and these have been taken into  
Early and intensive monitoring of strategic  
account in our (opportunities | risks) scenarios.  
opportunities|risks  
Potential long-term climate-related risks and  
opportunities beyond this have been taken into  
account in strategic decision-making.  
VALUE OF ASSETS – OPPORTUNITIES & RISKS  
Write-ups and write-downs of assets,  
Environmental, social and governance (ESG) aspects  
procurement rights, investments  
are becoming increasingly important factors in the  
Allowances for receivables  
risk management process.  
Creation of provisions for impending losses  
For opportunities|risks that may affect questions of  
Measures:  
sustainability as a result of Energie AG’s business  
Ongoing monitoring, sensitivity analyses  
activities, see “Sustainability Opportunities and  
Long-term contracts  
Risks” › Page 34  
Counterparty risk management  
1)  
Risk|opportunities, definition:  
- A risk is the possibility of an event occurring which has a negative impact on targets (EBT, EBIT, cash flow)  
- An opportunity is the possibility of an event occurring which has a positive impact on targets (EBT, EBIT, cash flow)  
For more information on the risks | opportunities which may have an impact on the concerns of the Sustainability and Diversity Act (NaDiVeG) as a  
result of Energie AG’s business activities, see Sustainability opportunities and risk management › Page 34  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
236  
Consolidated Financial Statements Notes  
MARKET AND COMPETITION RISKS  
+|− Market price changes  
+|- Market price and volume changes in waste  
management  
(electricity, gas, biomass and CO2 emissions  
Recycling materials, industrial waste, domestic  
allowances prices)  
waste, delivery prices, thermal, …  
Measures:  
Increased competition from pretreatment plants  
Bundled management of commodity price risks by  
and industrial co-incinerators  
Energie AG Oberösterreich Trading GmbH  
Increased re-municipalisation efforts of municipal  
Risk strategies geared for the market environment  
waste management associations  
Leveraging of internal synergies within the Group  
Measures:  
Long-term indexed contracts with defined delivery  
+|− Electricity generated from hydroelectric power  
volumes and prices  
influenced by development of weather/climate  
Focused market activities  
Intensification of cooperation with the public  
Measures:  
sector  
Optimised management of generation portfolio  
Further development of the digitalisation projects  
+|- Electricity production from thermal power  
+|- Contractual losses|gains and contract changes in  
plants  
the water|wastewater sector  
Measures:  
Measures:  
Bundled management of commodity price risks by  
Synergy projects  
Energie AG Trading  
Ongoing participation in (concession) tenders  
Long-term contracts  
Leveraging of internal synergies within the Group  
Risk strategies geared for the market environment  
+|- Electricity, gas, heat and telecommunications  
services sales volumes  
influenced by development of weather/climate,  
competition, economy, policy, …  
Measures:  
Bundling of sales organisations  
Price guarantee  
Service and subsidy offerings  
Focus on digitalisation  
Positioning as an energy service provider  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
237  
Consolidated Financial Statements Notes  
OPPORTUNITIES | RISKS FROM BUSINESS OPERATIONS  
- Facility risks  
- Risks from information security, cyber-security  
and data protection  
Impairment of the availability of facilities due to  
Measures:  
Technical malfunctions, sabotage, …  
Optimised insurance strategy  
Natural disasters such as storms, flooding, …  
Comprehensive technical measures  
Measures:  
Management systems for information security  
and data protection  
Maintenance and quality controls  
Optimised maintenance strategy  
Structural (flood) protection measures  
- Personnel risks  
Strategy programmes “Replacing overhead  
Health and safety risks for company staff and  
medium-voltage lines that are particularly  
temporary employees  
susceptible to disruption with underground  
Loss of expertise and practical knowledge  
cable”, “Replacing low-voltage lines”, consistent  
expansion of grid automation  
Measures:  
Crisis and contingency management  
Safety training courses for employees  
Insurance  
In-house health management project  
energy@work  
Apprentice|trainee education  
+|− Physical weather risks  
Group policies “Human Resource Management”,  
such as periods of heat|drought, flooding, storms,  
“Management by Objectives” and “Management  
hail, forest fires, avalanches and their impact on  
Academy”  
third parties  
Measures:  
Structural (flood) protection measures  
Strategy programmes “Replacing overhead  
medium-voltage lines that are particularly  
susceptible to disruption with underground  
cable”, “Replacing low-voltage lines”, consistent  
expansion of grid automation  
Crisis and contingency management  
Insurance  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
238  
Consolidated Financial Statements Notes  
POLITICAL, REGULATORY AND STATUTORY OPPORTUNITIES |  
RISKS  
+|− Changes in the statutory environment  
+|- Political and statutory environment  
for the electricity and gas grids  
EU climate policy provisions and their  
implementation in Austria  
Measures:  
Statutory environment for project development  
Intensive and constructive dialog with the  
and implementation  
regulatory authorities  
Changes to subsidy regime  
Cooperation with interest groups  
Measures:  
Intensive and constructive dialog with authorities  
+|- Legal risks  
and politicians  
Cooperation with interest groups  
from pending legal disputes  
Measures:  
Legal support  
Provisions in the balance sheet  
Out-of-court settlements  
COMPLIANCE RISKS AND DATA PROTECTION INFRINGEMENTS  
- Compliance risks  
- Data protection infringements  
Antitrust and corruption risks  
Accidental or unlawful destruction, loss, alteration  
or disclosure of data  
Financial market compliance  
Hacker attacks  
Measures:  
Measures:  
Group policies “Compliance Management  
System” and “Anti-Corruption”, “Handling on  
Group policies “Data Protection Management  
Insider Information”, “ICT Information Security  
System” and “Data Protection Compliance Policy”  
Management”  
In-person training and e-learning courses  
In-person training and e-learning courses  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
239  
Consolidated Financial Statements Notes  
FINANCIAL RISKS  
+|- Changes in interest rates  
+|- Opportunities|Risks from investments in other  
companies  
Measures:  
Fluctuations in the returns on investments  
Long-term fixed interest agreements  
Fluctuations in dividends received  
Measures:  
+|- Foreign exchange risk  
Ongoing monitoring  
Primarily from the transaction and translation risks of  
Representation on the boards of the subsidiaries  
the Czech Group companies  
Measures:  
+|- Changes in the discount rate for provisions  
Ongoing monitoring  
The present value of provisions decreases at a higher  
Currency hedging, where necessary  
discount rate and increases at a lower discount rate  
Measures:  
+|- Prices changes in financial assets (securities,  
Ongoing monitoring  
funds)  
resulting from fluctuations in market value on the  
capital markets  
- Counterparty risks  
Measures:  
Complete or partial failure of counterparties  
Conservative investment policy  
Measures:  
Consistent monitoring  
Ongoing monitoring  
On-going quantification of share price risks  
Credit limit systems  
Hedging instruments  
Targeted strategy of diversification of business  
+|- Rating change  
partners  
means lower| higher refinancing costs  
Measures:  
- Liquidity risk  
The management of Energie AG continues to  
Measures:  
seek to maintain Energie AG’s Single A credit  
rating in the long term  
Centralised, forward-looking liquidity planning  
Ensuring compliance with the required key  
Sufficient liquidity reserves  
financial performance indicators  
Open, partially committed credit lines  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
240  
Consolidated Financial Statements Notes  
36.  
Related party disclosures  
Related parties include OÖ Landesholding GmbH as majority shareholder as well as its  
subsidiaries, the Province of Upper Austria as sole investor of OÖ Landesholding GmbH, the  
joint ventures, the associated companies as well as members of the Management Board and  
of the Supervisory Board of Energie AG Oberösterreich and their close relatives.  
Revenues  
Expenses  
Receivables  
Liabilities  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Province of Upper Austria  
2021/2022  
1,356.1  
429.5  
147.9  
1,818.9  
2020/2021  
1,445.4  
520.4  
164.5  
2,395.5  
OÖ Landesholding and subsidiaries  
2021/2022  
16,759.2  
183.4  
19,443.9  
103.2  
2020/2021  
12,278.8  
243.0  
1,518.1  
9,251.7  
2021/2022  
148,916.4  
32,574.8  
10,355.2  
526.1  
Associated companies  
2020/2021  
54,173.9  
14,683.6  
3,646.6  
219.1  
Joint ventures  
2021/2022  
27,426.1  
4,860.7  
86,857.9  
857.2  
2020/2021  
5,415.4  
1,978.0  
1,012.8  
1,786.4  
Province of Upper Austria  
The Province of Upper Austria is the sole investor of OÖ Landesholding GmbH. OÖ  
Landesholding GmbH is the majority shareholder of Energie AG Oberösterreich.  
OÖ Landesholding GmbH  
Energie AG Oberösterreich and selected subsidiaries are members of the OÖ Landesholding  
GmbH tax group. The provisions of the OÖ Landesholding GmbH Group contract govern the  
relationship between Energie AG Oberösterreich and the Group parent, whereas Energie AG  
Oberösterreich calculates its taxable income in consideration of the taxable income of its  
subordinate Group companies. In the case of positive tax income, any positive tax allocations  
are offset using the applicable tax rate of 25%. Negative tax results are carried forward. The  
tax allocations amount to EUR 30,195.7 thousand (previous year: EUR 28,081.0 thousand).  
Sales revenues were also generated with OÖ Landesholding GmbH and its subsidiaries, in  
particular through the supply of electricity and gas, in the amount of EUR 16,759.2 thousand  
(previous year: EUR 12,278.8 thousand). As of the reporting date, this item also includes  
receivables in the amount of EUR 19,443.9 thousand (previous year: EUR 1,518.1 thousand)  
and liabilities of EUR 103.2 thousand (previous year: EUR 9,251.7 thousand).  
Associated companies  
Salzburg AG für Energie, Verkehr und Telekommunikation  
Gas and electricity deliveries at standard market terms take place between the Group and  
Salzburg AG. The sales revenues amount to EUR 6,787.3 thousand (previous year:  
EUR 5,951.8 thousand), while expenses are EUR 3,175.8 thousand (previous year:  
EUR 3,814.9 thousand).  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
241  
Consolidated Financial Statements Notes  
Wels Strom GmbH  
In addition to grid services, heat and electricity deliveries at standard market terms took place  
between the Group and Wels Strom GmbH. The sales revenues amount to  
EUR 137,476.5 thousand (previous year: EUR 44,227.7 thousand), while expenses are  
EUR 28,431.4 thousand (previous year: EUR 10,356.7 thousand). As of the reporting date,  
this item also includes receivables of EUR 9,841.3 thousand (previous year:  
EUR 3,045.5 thousand).  
Joint ventures  
BBOÖ Breitband Oberösterreich GmbH  
Energie AG Oberösterreich has provided a funding in the amount of EUR 67,500.0 thousand  
for BBOÖ Breitband Oberösterreich GmbH with a term until 30 September 2023.  
Furthermore, the Group provided construction services and other services amounting to  
EUR 20,862.9 thousand (previous year: EUR 0.0 thousand) to BBOÖ Breitband Oberösterreich  
GmbH and its subsidiary Breitband Oberösterreich Infrastruktur GmbH. Services amounting to  
EUR 3,045.3 thousand (previous year: EUR 0.0 thousand) were purchased. This item also  
includes receivables in the amount of EUR 18,363.5 thousand (previous year:  
EUR 0.0 thousand) and liabilities in the amount of EUR 845.4 thousand (previous year:  
EUR 0.0 thousand). The settlements are conducted at standard market conditions.  
Members of the Management in key positions  
Members of the management in key positions include the members of the Management  
Board and the Supervisory Board of Energie AG Oberösterreich, and the Management Board  
and the Supervisory Board of OÖ Landesholding GmbH. Please refer to section 10 with regard  
to the remuneration of the members of the Management Board and the Supervisory Board of  
Energie AG Oberösterreich. Additional disclosable transactions included revenues of  
EUR 16.4 thousand (previous year: EUR 13.1 thousand) and benefits in the amount of  
EUR 124.3 thousand (previous year: EUR 116.6 thousand). This item also includes receivables  
in the amount of EUR 1.0 thousand (previous year: EUR 1.4 thousand).  
37.  
Material events after the reporting date  
On 18 November 2022, the Austrian Federal Government announced the key points related  
to the national implementation of the EU Emergency Measures Regulation on the absorption  
and redistribution of surplus proceeds. In future, a price cap of EUR 140.0/MWH, possibly  
higher if additional direct costs can be established, will be imposed on electricity producers.  
There will also be an input credit for investments into renewable energies and energy  
efficiency. These regulations come into effect on 1 December 2022 in Austria and will apply  
until 31 December 2023. An initiative for the new Energy Crisis Levy Act was already  
submitted to the National Council and a resolution is expected in December.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
242  
Consolidated Financial Statements Notes  
38.  
Disclosures on Group management bodies  
In this fiscal year, the members of the management board of Energie AG Oberösterreich  
were:  
KommR Prof. Ing. DDr. Werner Steinecker MBA (CEO, Kirchschlag); KommR Mag. Dr. Andreas  
Kolar (Member of the Management Board, Steyr); Dipl.-Ing. Stefan Stallinger MBA (Member  
of the Management Board, Linz).  
The Supervisory Board of Energie AG Oberösterreich had the following members in the  
2021/2022 fiscal year:  
Provincial Councillor Markus Achleitner (Chairman); Mag. Stefan Lang LL.M (Vice-Chairman);  
Dr. Heinrich Schaller (Deputy Vice-Chairman); Dr. Miriam Eder MBA; Mag. Dr. Erich  
Entstrasser; Mag. Dr. Christiane Frauscher; Mag. Florian Hagenauer MBA; Dipl.-Ing. Erich  
Haider MBA; Mag. Anna-Maria Hochhauser (until 17 December 2021); Dr. Elisabeth  
Kölblinger (since 17 December 2021); Mag. Michaela Keplinger-Mitterlehner; Mag. Kathrin  
Renate Kühtreiber-Leitner MBA; Member of the Provincial Parliament Ing. Herwig Mahr;  
Gertrude Schatzdorfer-Wölfel (since 4 March 2022); Thomas Peter Stadlbauer MSc MBA MPA;  
Josef Walch (until 17 December 2021).  
Appointed by the Works Council: Ing. Mag. Leopold Hofinger (until 21 April 2022); Mag. Dr.  
Regina Krenn; Ing. Peter Neißl MBA MSc; Edith Schatzdorfer (since 21 April 2022); Ing.  
Bernhard Steiner; Christian Strobl; Gerhard Störinger; Andreas Walzer.  
Linz, 5 December 2022  
The Management Board of Energie AG Oberösterreich  
Chief Executive Officer  
DDr. Werner Steinecker MBA  
Dr. Andreas Kolar  
Dipl.-Ing. Stefan Stallinger MBA  
Chairman of the Management Board  
Member of the Management Board  
Member of the Management Board  
CEO  
CFO  
COO  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
243  
Consolidated Financial Statements Audit Certificate  
AUDIT CERTIFICATE  
REPORT ON THE CONSOLIDATED FINANCIAL STATEMENTS  
Audit opinion  
We have audited the Consolidated Financial Statements of Energie AG Oberösterreich, Linz,  
and its subsidiaries (the Group) comprising the Consolidated Statement of Financial Position  
as of 30 September 2022, the Consolidated Statement of Income, Consolidated Statement of  
Comprehensive Income, Statement of Changes in Equity, and Consolidated Cash Flow  
Statement for the fiscal year ending on that date, as well as the Notes to the Consolidated  
Financial Statements.  
It is our opinion that the attached Consolidated Financial Statements comply with the  
statutory requirements and offer an adequately accurate representation of the asset and  
financial position of the Group as of 30 September 2022, as well as the Group’s earnings  
position and cash flows during the fiscal year ending as of that date, in accordance with the  
International Financial Reporting Standards (IFRS), as they are to be applied in the EU and the  
additional requirements stipulated in § 245a of the Austrian Commercial Code (UGB), the  
Electricity Industry and Organisation Act 2010, and the Gas Industry Act 2011.  
Basis for our audit opinion  
We have conducted our audit in accordance with Directive (EU) No. 537/2014 (EU Directive  
hereinafter) and the Austrian Principles of Proper Auditing of Financial Statements. These  
principles require the application of the International Standards on Auditing (ISA). Our  
responsibilities under these regulations and standards are set out in more detail in Section  
“Responsibilities of the Auditor in Auditing the Consolidated Financial Statements” of the  
audit certificate. We are independent from the Group in compliance with the Austrian  
corporate law and professional regulation and have discharged our other professional duties  
in accordance with these requirements. We are of the opinion that the audit evidence  
obtained by us by the date of our audit certificate is sufficient and suitable for forming the  
basis for our audit opinion expressed as of that date.  
Highly significant audit findings  
Highly significant audit findings are findings concerning circumstances that, in our  
professional judgement, had the highest significance for our audit of the Consolidated  
Financial Statements for the fiscal year. These findings were considered in the context of our  
audit of the Consolidated Financial Statements in their entirety, as well as in forming our  
audit opinion. We do not issue a separate opinion on these findings.  
The circumstances bearing the most relevance for our audit were:  
1. Measurement of cash generating units  
Circumstances and problem  
The intangible assets (excluding goodwill assets) and property, plant and equipment with a  
total carrying amount of around EUR 2,136.2 million represent 30.9% of the Group’s total  
assets as of the reporting date. No impairments or reversals of impairment were recognised  
for any intangible assets in the year under review. For property, plant and equipment assets,  
impairments amounting to EUR 1.0 million and reversals of impairment amounting to  
EUR 4.1 million were recognised.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
244  
Consolidated Financial Statements Audit Certificate  
When preparing the Consolidated Financial Statements, Energie AG Oberösterreich assesses  
whether there are indications for an impairment or impairment reversal for all significant cash  
generating units. If indications exist, the recoverable amount for the concerned cash  
generating units is ascertained and the respective carrying amount is increased or decreased  
to match the recoverable amount.  
The recoverable amount for a cash generating unit corresponds to the larger amount  
resulting from the fair value less the costs of disposal or the value in use, with the latter  
determined using the discounted cash flow method. Measuring the recoverable amount  
requires a number of discretionary decisions and is subject to significant components derived  
by estimation, e.g. selection of the appropriate method for measuring the company’s value,  
estimation of future cash flows, and determination of a reasonable discounting rate. There is  
a risk that inadequate estimates and/or discretionary decisions have a significant impact on  
the resultant recoverable amount and in turn on the carrying amounts recognised for the  
intangible assets and property, plant and equipment in the Consolidated Statement of  
Financial Position and the operating result reported in the Consolidated Statement of Income.  
Details pertaining to the measurement of cash generating units can be found in the Notes,  
particularly section 5.6 and section 16.2.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
245  
Consolidated Financial Statements Audit Certificate  
Audit methodology  
We have carried out our audit of the measurement of the intangible assets and property,  
plant and equipment assets as follows:  
We have analysed and critically examined the process for measuring cash generating  
units on the basis of the documentation available at the company and information  
received with respect to whether the process is suitable to assure a reasonable  
measurement of the cash generating units.  
We have identified the internal controls for this process we deemed relevant to the  
outcome of our audit and assessed how they have been developed and set up.  
We have critically examined the Group’s analyses of indications for a necessary material  
impairment or reversal of impairment, and assessed them in consideration of the insights  
gained from our audit of the Consolidated Financial Statements.  
Where such indicators were present, we examined the calculation of the recoverable  
amount with a particular focus on discretionary decisions and estimations as follows:  
We have reviewed the selection of the valuation model, the planning assumptions,  
and the valuation parameters.  
Our valuation specialists have assessed the assumptions made in connection with  
the discounting rate on their adequacy by verifying them against market- and  
industry-specific reference values.  
We have assessed the formal and substantial plausibility of the internal planning  
calculations that form the foundation for the assumptions made in relation to  
expected cash flows.  
The results of the calculations of recoverable amounts were juxtaposed against the  
carrying amounts for the concerned intangible assets and/or the concerned  
property, plant and equipment and we assessed any potential need for the  
recognition of an impairment or impairment reversal.  
2. Impairment of goodwill  
Circumstances and problem  
The Consolidated Statement of Financial Position of Energie AG Oberösterreich as of the  
reporting date report goodwill assets with a total carrying amount of around  
EUR 89.7 million. These assets were to the largest extent allocated to the cash generating  
units “Sales”, “Waste Management” and “Czech Republic”. No impairments were  
recognised for goodwill assets in the year under review.  
In the fourth quarter of each fiscal year, or during the course of the year when an indicator  
for an impairment arises, Energie AG Oberösterreich determines any potentially incurred  
impairment losses by subjecting the goodwill to impairment testing. An impairment loss is  
recognised when the carrying amount of a cash generating unit allocated to a goodwill asset  
exceeds its recoverable amount. The recoverable amount corresponds to the larger amount  
resulting from the fair value less the costs of disposal or the value in use, with the latter  
determined using the discounted cash flow method.  
Measuring the recoverable amount requires a number of discretionary decisions and is subject  
to significant components derived by estimation, e.g. selection of the appropriate method for  
measuring the company’s value, estimation of future cash flows, and determination of a  
reasonable discounting rate. There is a risk that inadequate estimates and/or discretionary  
decisions have a significant impact on the resultant recoverable amount and in turn on the  
carrying amounts recognised for the intangible (goodwill) assets in the Consolidated  
Statement of Financial Position and the operating result reported in the Consolidated  
Statement of Income.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
246  
Consolidated Financial Statements Audit Certificate  
Details pertaining to the measurement of goodwill can be found in the Notes, particularly  
section 5.5 and section 16.1.  
Audit methodology  
The value of goodwill assets must – irrespective of indicators for an impairment – be reviewed  
on a yearly basis. We therefore verified whether impairment testing was carried out for all  
material goodwill assets.  
That notwithstanding, our audit of the measurement of goodwill assets followed the same  
methodology as our audit of the measurement of the cash generating units. Our  
deliberations on the audit methodology thus apply analogously with regard to this audit  
finding of particular importance.  
Other Disclosures  
The legal representatives are responsible for the other required disclosures. Such other  
disclosures encompass all information presented in the Group annual report, with the  
exception of the Consolidated Financial Statements, the Group Management Report and the  
audit certificate. The Non-financial Report was received by us prior to the date of this audit  
certificate, the other components of the Group Annual Report are expected to be made  
available to us after that date.  
Our audit opinion on the Consolidated Financial Statements does not extend to these other  
disclosures, which are excluded from the assurances given by our firm. We refer to the  
section contained in the “Report on the Group Management Report” with regard to the  
information contained in the Group Management Report.  
Our audit of the Consolidated Financial Statements comes with the responsibility to read and  
consider the other disclosures with the objective of determining whether they contain  
significant discrepancies from the Consolidated Financial Statements and the insights gained  
during our audit, or whether they are significantly misrepresented in another way.  
We are compelled to report if the work carried out in relation to the other disclosures received  
before the date of the audit certificate leads us to the conclusion that these other disclosures  
are significantly misrepresented. Our audit has not resulted in any reportable circumstances.  
Responsibilities of the legal representatives and the Audit Committee for the  
Consolidated Financial Statements  
The legal representatives are responsible for compiling the Consolidated Financial Statements  
in compliance with the IFRS rules applicable in the EU and the additional requirements  
stipulated in § 245a of the Austrian Commercial Code (UGB), the Electricity Industry and  
Organisation Act 2010 and the Gas Industry Act 2011, and for assuring that they provide a  
true and fair view of the Group’s assets, liabilities, financial position and profit or loss. The  
legal representatives are further responsible for the internal controls deemed necessary by  
them for preparing a set of Consolidated Financial Statements that is free from significant  
misrepresentations caused by fraud or human error.  
In compiling the Consolidated Financial Statements, the legal representatives have the duty to  
form an opinion on the Group’s ability to continue its business operations, to disclose any  
relevant circumstances relating to the continuation of the business operations and to base  
their considerations on the principle of continued business operations, unless they intend to  
liquidate the Group, cease business operations or find themselves in lack of any viable  
alternative to such course of action.  
The Audit Committee is responsible for supervising the Group’s accounting processes.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
247  
Consolidated Financial Statements Audit Certificate  
Responsibilities of the auditors for the audit of the Consolidated Financial  
Statements  
Our objective is to assure an adequate degree of certainty on whether the Consolidated  
Financial Statements in their entirety are free from significant misrepresentations caused by  
fraud or human error, and to issue an audit certificate that reflects our audit findings. An  
adequate degree of certainty means a high degree of certainty, but is not an absolute  
guarantee that the audit conducted in accordance with the EU Directive and the Austrian  
Principles of Proper Auditing, which require application of ISA, has in fact identified all  
significant misrepresentations that may be contained in the audited financial statements.  
Misrepresentations may result from malicious acts or misconceptions and are deemed  
significant if they could, individually or collectively, have a potential influence on the  
commercial decisions made by their readers on the basis of these Consolidated Financial  
Statements.  
In conducting our audit in accordance with the EU Directive and the Austrian Principles of  
Proper Auditing, which require application of ISA, we form our opinions on the basis of our  
professional judgement and maintain a critical view of the circumstances presented to us  
throughout the entire course of the audit.  
We further adhere to the following:  
We identify and assess the risks stemming from any significant misrepresentations in the  
Financial Statements caused by fraud or human error, plan our audit activities as a  
response to these risks, perform our audit activities and gain sufficient and suitable audit  
evidence to serve as the basis for our audit findings. The risk of significant  
misrepresentations resulting from malicious acts remaining undetected is higher than the  
risk resulting from misconceptions, because malicious acts may include collusion,  
fraudulent acts, forgery, intentional omissions, deceiving representations or the  
circumvention of internal controls.  
In order to plan audit activities that adequately address the prevailing circumstances, we  
gain an understanding of the Group’s system of internal controls bearing relevance for  
our audit, but without the objective of forming an audit opinion on its effectiveness.  
We evaluate the appropriateness of the accounting methods applied by the legal  
representatives, as well as the tenability of values estimated by the legal representatives  
and represented in the accounts and the disclosures associated with such estimates.  
We draw inferences about the appropriateness of the legal representatives operating  
under the accounting principle of continued business operations, as well as, on the basis  
of the evidence presented to us for our audit, whether any events or circumstances are  
subject to a considerable uncertainty that would give rise to doubts about the viability of  
the Group continuing its business operations. If we arrive at the conclusion that a  
material uncertainty exists, we are obliged to draw attention to the associated  
disclosures contained in the Consolidated Financial Statements in our audit certificate, or  
to modify our audit certificate if these disclosures are inappropriate. We draw our  
conclusions on the basis of the audit evidence gathered by the date of our audit  
certificate. Future events or circumstances may however result in the Group resolving to  
discontinue its business operations.  
We form an opinion on the overall presentation, structure and contents of the  
Consolidated Financial Statements including the disclosures therein, as well as on  
whether they present a true and fair view of the underlying business transactions and  
events.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
248  
Consolidated Financial Statements Audit Certificate  
We issue our audit opinion on the Consolidated Financial Statements on the basis of  
sufficient and suitable audit evidence for the financial information of the business units  
or the business activities of the Group. We are responsible for managing, supervising  
and performing the audit of the Consolidated Financial Statements. We bear the sole  
responsibility for our audit opinion.  
We consult with the Audit Committee on matters such as the planned scope and timing of  
the audit as well as significant audit findings, including any significant defects in the system  
of internal control system detected during our audit.  
We also issue a statement to the Audit Committee confirming our adherence to the relevant  
professional requirements pertaining to our independence, and exchange information with  
the Audit Committee on all relationships and other circumstances that may reasonably be  
expected to affect our independence and, if applicable, any associated precautionary  
measures.  
From the circumstances discussed with the Audit Committee, we determine those that had  
the highest significance for the audit of the Consolidated Financial Statements for the fiscal  
year and are therefore the circumstances bearing special audit significance. We describe these  
circumstances in our audit certificate, unless public disclosure of a certain circumstance is  
prohibited by law or other legal requirement, or determine in very rare cases that certain  
circumstances should not be disclosed in our audit certificate because the negative  
implications of disclosing them could reasonably be expected to exceed the benefits for the  
public interest.  
Report on the Group Management Report  
Austrian corporate law requires an assessment of whether the Group Management Report  
reconciles with the Consolidated Financial Statements and whether it was compiled in  
accordance with the applicable legal requirements.  
The legal representatives are responsible for compiling the Group Management Report in  
compliance with the requirements under Austrian corporate law.  
We have conducted our audit on the basis of the professional principles for the auditing of  
group management reports.  
Audit opinion  
We have formed the opinion that the attached Group Management Report complies with the  
applicable legal requirements, that it contains accurate information pursuant to § 243a UGB,  
and that it reconciles with the Consolidated Financial Statements.  
Declaration  
Our audit of the Consolidated Financial Statements and the understanding formed about the  
Group and its business environment has not identified any material misrepresentations in the  
Group Management Report.  
Additional information pursuant to Article 10 EU Directive  
Our firm was elected auditors of the consolidated and individual financial statements for the  
fiscal year ending on 30 September 2022 by the General Meeting held on 17 December  
2021. On 9 February 2022, the Supervisory Board has granted our firm the mandate to audit  
the company’s financial statements for the fiscal year ending on 30 September 2022. We  
have been the Group’s auditors without interruption since the fiscal year ending  
30 September 2021.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
249  
Consolidated Financial Statements Audit Certificate  
We hereby declare that our audit opinion presented in section “Report on the Consolidated  
Financial Statements” reconciles with the additional report to the Audit Committee pursuant  
to Article 11 of the EU Directive.  
We hereby declare that we have not performed any prohibited non-audit services pursuant to  
Article 5 para 1 EU Directive and that we have maintained our independence from the  
audited group during the conduct of our audit of the financial statements.  
Responsible auditor  
The responsible auditor for this assignment was Mag. Gerhard Marterbauer.  
Vienna  
5 December 2022  
Deloitte Audit Wirtschaftsprüfungs GmbH  
Mag. Gerhard Marterbauer  
Auditor  
The Consolidated Financial Statements with our audit certificate may only be published or disclosed in the format  
certified by us. This audit certificate refers exclusively to the full original Consolidated Financial Statements and the  
Group Management Report issued in German. The provisions of § 281 para 2 of the Austrian Commercial Code (UGB)  
must be observed for any other versions.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
250  
Consolidated Financial Statements Statement by the Management Board  
STATEMENT BY THE MANAGEMENT BOARD  
PURSUANT TO § 124 PARA 1 SUBPARA 3 OF THE  
STOCK EXCHANGE ACT [BÖRSEGESETZ (BÖRSEG)]  
The Management Board of Energie AG Oberösterreich confirms to the best of its knowledge  
that the Consolidated Financial Statements of Energie AG Oberösterreich give a true and fair  
view of the assets, liabilities, as well as the financial and earnings position of the Group as  
required by the applicable accounting standards, and that the Group Management Report  
represents the development and performance of the business and the position of the Group  
in such a way, that it gives a true and fair view of the assets, liabilities, as well as the financial  
and earnings position of the Group, together with a description of the principal risks and  
uncertainties faced by the Group.  
Linz, 5 December 2022  
The Management Board of Energie AG Oberösterreich  
Chief Executive Officer  
DDr. Werner Steinecker MBA  
Dr. Andreas Kolar  
Dipl.-Ing. Stefan Stallinger MBA  
Chairman of the Management Board  
Member of the Management Board  
Member of the Management Board  
CEO  
CFO  
COO  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
Company  
Annual Report  
2021/2022  
of Energie AG Oberösterreich  
Loading SVG
Company Annual Report 2021/2022  
Contents  
253 COMPANY ANNUAL REPORT 2021/2022  
253 Audited Company Annual Report  
253  
Statement of Financial Position  
253  
Statement of Income  
255  
Notes to the Annual Financial Statements  
275  
Annexes to the Notes  
290 Company Management Report  
290  
General conditions  
297  
Employees  
304  
Assets, liabilities, financial position and profit or loss  
306  
Financing and investment strategy  
307  
Corporate management and capital costs  
308  
Treasury stocks  
309  
Internal control system  
310  
Risks and opportunities  
316  
Research, development and innovation  
318  
Outlook  
327 Statement by the Management Board  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
253  
Company Annual Report 2021/2022  
Company Annual Report 2021/2022  
of Energie AG Oberösterreich  
AUDITED COMPANY ANNUAL REPORT  
STATEMENT OF FINANCIAL POSITION AS OF 30 SEPTEMBER  
2022  
30.09.2022  
30.09.2021  
ASSETS  
EUR  
EUR 1,000  
A. Non-current assets  
I. Intangible assets  
63,370,919.74  
60,484  
II. Property, plant and equipment  
1,414,492,430.73  
1,480,977  
III. Financial assets  
785,764,262.11  
772,054  
2,263,627,612.58  
2,313,514  
B. Current assets  
I. Inventories  
90,681,794.15  
27,658  
II. Receivables and other assets (thereof with a remaining term of more than 1 year:  
EUR 0.00; previous year: EUR 5 thousand)  
51,788,850.63  
96,724  
III. Securities  
159,574,305.96  
19,950  
IV. Cash, credit balances with banks  
981,515,284.67  
262,377  
1,283,560,235.41  
406,709  
C. Accruals and deferrals  
3,571,490.33  
3,765  
3,550,759,338.32  
2,723,988  
30.09.2022  
30.09.2021  
LIABILITIES  
EUR  
EUR 1,000  
A. Equity  
I. Called and paid share capital (thereof subscribed share capital  
EUR 88,652,558.00; prev. year: EUR 88,654 thousand)  
88,652,558.00  
88,654  
less nominal value of treasury stocks  
-808.00  
-1  
88,651,750.00  
88,653  
II. Committed capital reserved  
209,137,542.00  
209,136  
III. Retained earnings  
1. Legal reserves  
8,000,000.00  
8,000  
2. Free reserves  
429,638,295.69  
471,213  
3. Reserves for treasury stocks  
808.00  
1
437,639,103.69  
479,215  
IV. Balance sheet profit (thereof profit carried forward EUR 10,581.50; prev. year:  
EUR 8 thousand)  
53,200,000.00  
66,500  
788,628,395.69  
843,503  
B. Investment subsidies  
10,369,281.92  
11,382  
C. Special item for emission allowances allocated free of charge  
2,170,112.88  
1,260  
D. Provisions  
79,392,505.43  
71,710  
E. Liabilities  
(thereof with a remaining term of up to one year: EUR 1,844,797,362.36; previous  
year EUR 915,231 thousand  
thereof with a remaining term of more than one year: EUR 781,244,681.42; previous  
year: EUR 830,073 thousand)  
2,626,042,043.78  
1,745,304  
F. Construction cost subsidies  
42,831,604.80  
48,599  
G. Accruals and deferrals  
1,325,393.82  
2,229  
3,550,759,338.32  
2,723,988  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
254  
Company Annual Report 2021/2022 Audited Company Annual Report  
STATEMENT OF INCOME 2021/2022  
2021/2022  
2020/2021  
EUR  
EUR 1,000  
1. Sales revenues  
590,207,792.00  
409,489  
2. Capitalised corporate services  
606.75  
0
3. Other operating income  
3,351,526.47  
3,985  
4. Expenses for material and other purchased services  
-431,635,314.54  
-191,428  
5. Personnel expenses  
-12,739,704.55  
-11,605  
6. Depreciation, amortisation and write-downs (thereof write-downs EUR 521,174.75;  
previous year: EUR 241 thousand)  
-120,429,117.13  
-123,108  
7. Other operating expenses  
-25,698,385.80  
-27,446  
8. Subtotal from 1-7 (operating result)  
3,057,403.20  
59,887  
9. Income from investments (thereof from affiliated companies EUR 19,000,000.00;  
prev. year EUR 28,000 thousand)  
21,297,120.16  
29,585  
10. Income from other securities and lendings from the non-current financial assets  
(thereof from affiliated companies EUR 329,912.34; prev. year EUR 366 thousand)  
758,147.42  
772  
11. Other interest and similar income (thereof from affiliated companies EUR 0.00;  
prev. year: EUR 0 thousand)  
7,981,571.53  
451  
12. Income from the disposal and write-up of financial assets and current securities  
(thereof from affiliated companies EUR 0.00; previous year: EUR 22 thousand)  
0.00  
22  
13. Expenses from financial assets and current securities (thereof from affiliated companies  
EUR 18,510.78; previous year: EUR 1,523 thousand, thereof from write-downs  
EUR 1,357,233.46; previous year EUR 44 thousand)  
-1,375,744.24  
-1,567  
14. Interest and similar expenses  
(thereof from affiliated companies EUR 4,203,041.66; previous year:  
EUR 3,255 thousand)  
-25,737,596.69  
-24,188  
15. Subtotal from 9-14 (financial result)  
2,923,498.18  
5,074  
16. Earnings before taxes  
5,980,901.38  
64,962  
17. Income taxes  
(thereof deferred taxes EUR -6,642,905.72; previous year: EUR 6,703 thousand)  
5,652,086.40  
-1,504  
18. Earnings after taxes = net profit for the year  
11,632,987.78  
63,458  
19. Reversal of retained earnings  
41,556,430.72  
3,035  
20. Profit for the year  
53,189,418.50  
3,035  
21. Profit carried forward from the previous year  
10,581.50  
8
22. Balance sheet profit  
53,200,000.00  
3,042  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
255  
Notes to the Annual Financial Statements  
NOTES TO THE ANNUAL FINANCIAL STATEMENTS 2021/2022  
1. General notes  
The present Annual Financial Statements for the fiscal year 2021/2022 were prepared in  
compliance with the principles of proper accounting and the general duty to provide a  
suitable view of the net asset, financial and earnings position of the company in accordance  
with the Austrian Commercial Code [UGB].  
The Company is classified as a large stock corporation pursuant to § 221 of the Austrian  
Commercial Code (UGB).  
In order to achieve a clear presentation, some items have been condensed in the Statement  
of Financial Position and in the Statement of Income. These items are explained separately in  
the Notes to the Annual Financial Statements.  
For assets and liabilities that are split between different items of the Statement of Financial  
Position, the respective splitting relationship with other items is disclosed in the Notes.  
The Statement of Income is presented in vertical format and was prepared using the total-  
cost method.  
In the 2021/2022 fiscal year, reorganisation steps were taken in the “Fiber to the home”  
broadband / fibre-optic network expansion drive. The following reorganisation steps affected  
Energie AG Oberösterreich:  
1. The “Operation Layer 1 and Layer 2” operational units of Energie AG Oberösterreich  
Telekom GmbH were spun off to Energie AG Oberösterreich effective from 30 September  
2021.  
2. The “Operation Layer 1 (including associated assets Layer 1) and Operation Layer 2”  
operational units of Energie AG Oberösterreich were spun off to OÖ Breitband  
Infrastruktur GmbH effective from 30 September 2021.  
3. The 100% share in OÖ Breitband Infrastruktur GmbH was transferred from Energie AG  
Oberösterreich to Fiber Service OÖ GmbH in return for the assignment of shares amounting  
to 50% in Fiber Service OÖ GmbH by OÖ Landesholding GmbH (effective date 1 October  
2021).  
Appendix 5 to the Notes contains the takeover balance sheet as of 1 October 2021 for 1., the  
takeover balance sheet as of 1 October 2021 for 2. and the contribution balance sheet as of  
1 October 2021 for 3.  
There is only limited direct comparability with the previous year due to the reorganisation  
steps that have taken place.  
The format used in previous years was continued in the preparation of the present Annual  
Financial Statements.  
Together with individual Group companies, Energie AG Oberösterreich was incorporated into  
the Group of companies of OÖ Landesholding GmbH (Group parent) as a member company  
pursuant to § 9 KStG (Austrian Tax Act) starting with the 2010 tax year. The associated  
inclusion in the group and tax allocation agreement of OÖ Landesholding GmbH was  
finalised.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
256  
Company Annual Report 2021/2022 Audited Company Annual Report  
The provisions of the OÖ Landesholding GmbH Group contract govern the relationship  
between Energie AG Oberösterreich and the Group parent, whereas Energie AG  
Oberösterreich calculates its taxable income in consideration of the taxable income of its  
subordinate Group companies (accrual principle):  
The Group contract provides for the recognition of positive tax allocations from Group  
members in an amount corresponding to 25% of the allocated positive income. The tax  
losses allocated to the Group parent reduce the basis for positive tax allocations to be paid to  
the Group parent in subsequent years. However, the Group parent can ultimately assume the  
allocated negative result by paying a negative tax allocation to the Group company in the  
amount of 97% of the tax portion attributable to the assumed negative income.  
The option of a deviating tax allocation agreement between Energie AG Oberösterreich and  
its Group companies provided for in the accession agreement to the Group contract was  
exercised and a clearing procedure similar to the clearing system described above was  
approved at the level of Energie AG Oberösterreich and its subordinate Group members.  
On 1 October 2004, Energie AG Oberösterreich introduced an effective cash-pooling system  
that aims at optimising the management of the Group’s bank accounts, as well as the intra-  
group liquidity management and the processing of payment transactions within the Group.  
Energie AG Oberösterreich decided in favour of two pooling groups, and since 1 October  
2006 Energie AG Group Treasury GmbH has been the lead company of the pool.  
A total of 27 (previous year: 27) entities participate in the pooling arrangements as of  
30 September 2022.  
Energie AG Oberösterreich is Energie AG Group’s highest-level parent company and prepares  
the Consolidated Financial Statements prescribed under § 245a para 1 of the Austrian  
Commercial Code (UGB). The Consolidated Financial Statements are filed with the Provincial  
Court of Linz as the competent Commercial Court.  
2. Accounting policies  
The accounting policies applied in the previous year were continued.  
General principles  
The Annual Financial Statements were prepared in adherence to the principle of  
completeness.  
The principle of obtaining individual measurements was applied in the measurement of assets  
and liabilities.  
The company observed the principle of prudence by only recognising profits that were  
realised by the date of the Statement of Financial Position. All discernible risks and impending  
losses incurred up to the date of the Statement of Financial Position are included in the  
Annual Financial Statements.  
Estimates are based on prudent appraisals. The company has based its estimates on statistical  
data from its historical experience with similar circumstances.  
Measurements were made under the assumption of a continuation of the company.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
257  
Company Annual Report 2021/2022 Audited Company Annual Report  
Non-current assets  
Intangible assets are, to the extent acquired against consideration, measured at their  
acquisition costs and depreciated over a useful life of 5 to 20 years using the straight-line  
method.  
Property, plant and equipment assets are measured at cost less straight-line depreciation.  
Buildings are depreciated over a useful life ranging from 15 to 40 years, manufacturing plant  
and equipment as well as other equipment, furniture and fixtures are depreciated over a  
useful life of 4 to 25 years.  
Low-value assets are fully written off in the year of their acquisition.  
Write-downs are recognised for impairments expected to be permanent.  
Shares in affiliated companies and other investments are recognised at cost or the lower  
attributable fair values.  
For the purposes of the Annual Financial Statements, shares in affiliated companies and  
investments are assessed on indications for a significant change in the attributable value. This  
includes an assessment of whether there are any prevailing external or internal influences that  
may cause a significant change in value. If necessary, the value is measured on the basis of  
discounted net cash inflows determined on the basis of the 5-year mid-term planning and/or  
available external planning data. The perpetual annuity is usually based on the cash inflows  
assumed in the mid-term planning. The assumptions for an increase in the perpetual annuity  
are determined in a company-specific approach. The specific discount rate applied by the  
company is derived from the current market data. The pro-rata equity serves as the lower  
ceiling for the measurement of participating interests.  
Securities (book-entry securities) held investments are measured at their purchase prices or, in  
the event of a permanent impairment, at the lower stock exchange price.  
Non-interest-bearing and low-interest-bearing lendings are shown at their present value.  
Write-ups are now always recognised following an upward revaluation or if the reasons for a  
write-down no longer apply. Pursuant to § 124b para 270 of the Austrian Income Tax Act  
(EStG), a reserve for taxes assessable on write-ups has been formed in the  
2016/2017 fiscal year for write-ups of security investments unrecognised prior to  
30 September 2016. This reserve is recognised as deferred income and reversed in  
accordance with the tax provisions pursuant to § 906 para 32 of the Austrian Commercial  
Code (UGB).  
Part of the provision for value adjustments was reversed with tax effect in the  
2021/2022 fiscal year, as the allocable tax value of the financial assets concerned was lower  
than the allocable tax value relevant for the formation of the provision for value adjustments.  
Current assets  
Raw materials and supplies are measured at their average acquisition or production costs  
(moving average price method), lower current values or fixed values.  
Work in progress is measured at the attributable production costs.  
Receivables are measured at their nominal value, taking their collectability into account. Bad  
debt allowances are recognised for receivables that may not be collectable. Receivables in  
foreign currency are measured in strict adherence to the principle of lower of cost or market.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
258  
Company Annual Report 2021/2022 Audited Company Annual Report  
Deferred taxes  
Deferred tax assets are generally recognised for all temporal differences between the values  
of assets, provisions and liabilities under tax law and their carrying values under corporate  
law. Pursuant to § 198 para 10 subpara 3 of the Austrian Commercial Code, deferred taxes  
from shares in affiliated companies are not recognised as deferred taxes if their reversal is  
plannable but not timeable from today’s perspective.  
A deferred tax liability will be recognised on the liabilities side of the Statement of Financial  
Position for taxes payable in future fiscal years. The calculation is based on a tax rate of  
between 23% and 24.25% (previous year: 25%).  
Provisions  
Actuarial principles are applied to calculate provisions for severance payments, using the  
“Projected-Unit-Credit” method, in keeping with IAS 19. The calculation is based on a  
retirement age of 62 years for females and males in keeping with transitional provisions or an  
earlier retirement age in individual cases, an interest rate of 4.00% for the calculations  
(previous year: 0.80%), planned salary increases of 3.50% (previous year: 2.90%) as well as a  
discount for fluctuations according to probabilities, depending on years of employment from  
1.87% for 0 years of employment (previous year: 1.82% for 0 years of employment) to  
0.00% from 42 years of employment (previous year: 0.0% from 42 years of employment).  
The provision for anniversary bonuses is also calculated using the “Projected-Unit-Credit”  
method in keeping with IAS 19, using the same parameters that were employed to calculate  
the provisions for severance payments. When calculating the provisions for anniversary  
bonuses, a discount for fluctuations according to probabilities, depending on years of  
employment from 1.87% for 0 years of employment (previous year: 1.82% for 0 years of  
employment) to 0.00% from 46 years of employment (previous year: 0.00% from 46 years of  
employment) was used as a basis.  
Actuarial principles are applied to calculate provisions for old-age pensions, stepped pensions  
and early retirement benefits, using the “Projected-Unit-Credit” method, in keeping with  
IAS 19. The calculation is based on the AVÖ 2018-P calculation tables, an actuarial interest  
rate of 4.00% (previous year 0.80%) and a pension trend of 2.25% (previous year 2.00%).  
The increase in the actuarial interest rate for calculating social capital provisions from 0.80%  
to 4.00% results in the reductions in the respective provisions exceeding the allocations in the  
expenses for severance payments and in the expenses for pensions. Changes in social capital  
provisions (provisions for severance payments, pensions, anniversary bonuses, phased  
pensions and early retirement) were previously recognised in personnel expenses due to  
changes in the actuarial interest rate. Exercising the option under AFRAC 27, margin no. 95,  
means that such changes are now recognised in the financial result. The option of  
recognising this in the financial result was exercised in the current fiscal year in order to  
ensure the clearest possible picture of the earnings situation, given the high impact of the  
change in the actuarial interest rate. The interest for accounting purposes included in the  
changes in provisions is reported as before in the item for interest and similar expenses in the  
financial result.  
Other provisions were formed in accordance with the principle of prudent accounting.  
In accordance with the statutory requirements, the company considered all discernible risks  
and impending losses in the measurement of the other provisions. Non-current provisions  
were discounted using an interest rate of 1.50% (previous year: 0.00%).  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
259  
Company Annual Report 2021/2022 Audited Company Annual Report  
Liabilities  
Liabilities are measured at their repayment amounts and in adherence to the principle of  
prudent accounting. Liabilities in foreign currencies are measured in keeping with the highest  
value principle.  
Emission allowances  
Starting in the 2009/2010 fiscal year, accounting of emission allowances based on AFRAC  
expert´s opinion takes place by capitalising emission allowances obtained at no charge at the  
time of their acquisition and measuring them at market value applicable on the date of their  
disposition. A special liability item is recognised in the same amount and reversed in  
accordance with the actual CO2 emissions. Emission allowances acquired against  
consideration are capitalised at cost on the acquisition date. The measurement of capitalised  
emission allowances strictly adheres to the lower-of-cost-or-market value principle. A  
provision is created to account for the obligation to surrender emission allowances based on  
the actual CO2 emissions.  
Starting with the 2013 calendar year, no free allocation is planned for power generation. In  
calendar year 2020, Energie AG received a free allocation for heat generation for the last  
time.  
Construction cost subsidies  
This item primarily includes financing contributions received from electricity and gas  
customers.  
They are reversed through profit or loss over a 15 to 40 year period. Since the 2005/2006 and  
2015/2016 fiscal years, construction cost subsidies are collected at the time new electricity  
and gas connections are installed by Netz Oberösterreich GmbH.  
3. Notes to the Statement of Financial Position  
Non-current assets  
The “Changes in non-current assets” (Annex 2 to the Notes) shows, in addition to the legally  
required outline and annual development, the company-specific composition of the non-  
current assets.  
Intangible assets  
In addition to electricity procurement rights, the intangible assets also comprise various  
computer software programmes, user rights for various systems, leasehold interests etc.  
Property, plant and equipment  
Low-value assets amounting to EUR 1,136 thousand were fully written off in the year of  
acquisition (previous year: EUR 1,293 thousand).  
The individual assets in item “Land and buildings” show real property assets in the amount of  
EUR 35,235 thousand (previous year: EUR 33,160 thousand).  
The use of property, plant and equipment not recognised in the Statement of Financial  
Position on the basis of long-term rent, lease and leasing agreements results in liabilities in  
the amount of EUR 2,177 thousand (previous year: EUR 1,924 thousand) for the next fiscal  
year. The liabilities for the next five years amount to EUR 9,963 thousand (previous year:  
EUR 9,286 thousand).  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
260  
Company Annual Report 2021/2022 Audited Company Annual Report  
Financial assets  
The table below provides information about the relevant data as of 30 September 2022 with  
respect to participating interests of 20% or more.  
Profit/loss  
Equity of the  
for the  
Share capital  
Interest in the company  
company  
year  
EUR 1,000  
%
EUR 1,000  
EUR 1,000  
EUR 1,000  
Affiliated companies  
Energie AG Oberösterreich Service- und  
Beteiligungsverwaltungs-GmbH, Linz  
35  
100  
35  
347,381  
18,268  
Energie AG Oberösterreich Umwelt  
Holding GmbH, Linz  
150  
100  
150  
102,892  
9,100  
Energie AG Group Treasury GmbH, Linz  
35  
100  
35  
34,655  
3,631  
Energie AG Oberösterreich  
Bohemia GmbH, Linz  
500  
100  
500  
33,854  
4,419  
Netz Oberösterreich GmbH, Linz  
5,000  
100  
5,000  
128,179  
17,901  
Energie AG Oberösterreich  
Trading GmbH, Linz  
150  
100  
150  
48,398  
8,109  
Energie AG Oberösterreich  
Erzeugung GmbH, Linz  
150  
100  
150  
80,787  
2,405  
Energie AG Oberösterreich Tech  
Services GmbH, Linz  
150  
100  
150  
17,964  
6,347  
Energie AG Oberösterreich Business  
Services GmbH, Linz  
35  
100  
35  
8,250  
2,792  
Energie AG Oberösterreich Customer  
Services GmbH, Linz  
35  
100  
35  
3,390  
652  
Energie AG Oberösterreich  
Telekom GmbH, Linz  
150  
100  
150  
11,080  
4,635  
Energie AG Oberösterreich  
Personalmanagement GmbH, Linz  
35  
100  
35  
2,473  
1,205  
Energy IT Service GmbH, Linz  
45  
33.3  
15  
144  
5
Cogeneration-Kraftwerke Management  
2)  
2)  
Oberösterreich GmbH, Linz  
100  
99.9  
100  
–
–
Wertstatt 8 GmbH, Linz 3)  
35  
100  
35  
1,082  
-19  
Energie AG Oberösterreich  
Vertrieb GmbH, Linz  
35  
100  
35  
106,500  
3,299  
Other investments  
BBOÖ Breitband Oberösterreich GmbH,  
Linz 1)  
35  
50  
17.5  
78,384  
-322  
Ennskraftwerke Aktiengesellschaft,  
Steyr 1)  
3,400  
50  
1,700  
26,349  
-1,115  
1) Figures as of 31 December 2021  
2) Discretionary non-disclosure as per § 242 para 2 subpara 2 of the Austrian Commercial Code (UGB)  
3) The loss for the year is absorbed by Energie AG Oberösterreich in accordance with the loss absorption agreement  
Lendings in the amount of EUR 3,661 thousand will mature in the next fiscal year.  
With effect on 1 October 2016, write-ups of investment securities recognised in  
fiscal year 2015/2016 were transferred into a provision for value adjustments pursuant to  
§ 124b para 270 subpara a of the Austrian Income Tax Act (EStG) and recognised as deferred  
income pursuant to § 906 para 32 of the Austrian Corporate Code.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
261  
Company Annual Report 2021/2022 Audited Company Annual Report  
Current assets  
Inventories  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
Raw materials and supplies  
90,682  
27,658  
Receivables and other assets  
Thereof  
Thereof  
securitised  
Capitalised  
Carrying value  
remaining term  
by bills of  
anticipated  
30.09.2022  
> 1 year  
exchange  
amounts  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Trade receivables  
44  
0
0
0
Previous year  
42  
5
0
0
Receivables from affiliated companies  
38,582  
0
0
0
Previous year  
40,086  
0
0
0
Receivables from companies in which an interest is held  
7,357  
0
0
0
Previous year  
309  
0
0
0
Other receivables and other assets  
5,807  
0
0
2,166  
Previous year  
56,286  
0
0
2,327  
51,789  
0
0
2,166  
Previous year  
96,724  
5
0
2,327  
The item Receivables from affiliated companies in the amount of EUR 38,582 thousand  
(previous year: EUR 40,086 thousand) consists of trade receivables in the amount of  
EUR 28,202 thousand (previous year: EUR 10,057 thousand), financial receivables in the  
amount of EUR 206 thousand (previous year: EUR 314 thousand), other receivables in the  
amount of EUR 38,413 thousand (previous year: EUR 39,179 thousand), including  
EUR 24,124 thousand (previous year EUR 10,981 thousand) receivables from positive tax  
allocations and EUR 14,000 thousand (previous year EUR 28,000 thousand) from same-year  
dividend payments, trade payables in the amount of EUR 27,271 thousand (previous year:  
EUR 9,432 thousand), other liabilities from tax allocations in the amount of  
EUR 949 thousand (previous year: EUR 32 thousand) and other liabilities from loss absorption  
in the amount of EUR 19 thousand (previous year: EUR 0 thousand).  
The carrying amount of the allocated free-of-charge CO2 emissions allowances on  
30 September 2022 was EUR 2,659 thousand. The carrying amount of the CO2 emission  
allowances acquired against payment was EUR 3 thousand as of 30 September 2022. The  
CO2 emissions allowance price on the reporting date was EUR 66.73, which means that it  
was necessary to write down part of the free-of-charge emission allowances. After write-  
down, the carrying amount was EUR 2,349 thousand as of 30 September 2022.  
Accruals and deferrals  
The discount on cost of finance, carried under assets, and the portions of issuing costs for  
bonds are written off in keeping with the terms of these bonds.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
262  
Company Annual Report 2021/2022 Audited Company Annual Report  
Equity  
Called share capital and paid-in share capital  
By resolution of the Annual General Meeting on 17 December 2021, the share capital of  
Energie AG was reduced by EUR 1,224.00 from EUR 88,653,782.00 to EUR 88,652,558.00  
by means of a simplified capital reduction by cancellation of 1,224 no-par value registered  
shares of treasury stock in the form of non-voting preferred shares.  
The share capital is broken down into 88,652,558 no-par-value shares (of which 88,600,000  
are ordinary shares and 52,558 non-voting preference shares) with a nominal value per share  
of EUR 1.00. All ordinary shares as well as the non-voting preference shares are registered in  
the bearer’s name.  
The company has formed appropriated reserves in the amount required by law.  
Capital reserves  
The reserves take the form of appropriated capital reserves.  
The appropriated capital reserve provides cover of the statutory reserve in the amount of  
EUR 865,255.80.  
Retained earnings  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
Legal reserves  
8,000  
8,000  
Other reserves (free reserves)  
429,638  
471,213  
Reserves for treasury stocks  
1
1
437,639  
479,215  
In the 2021/2022 fiscal year, free reserves in the amount of EUR 1 thousand (previous year:  
EUR 1 thousand) were transferred to the reserves for treasury stocks.  
The free reserves were reduced by the acquisition of treasury stocks in the amount of  
EUR 19 thousand.  
Free reserves from retained earnings were reversed in the amount of EUR 41,556 thousand in  
the fiscal year (previous year: EUR 3,035 thousand).  
In the context of the introduction of an employee-shareholding model, the shares transferred  
in the 2006/2007 fiscal year as a shareholder contribution free of charge from the State of  
Upper Austria, amounting to EUR 7,879 thousand, were purchased at favourable conditions  
by a defined group of employees of the Energie AG Oberösterreich Group. 1,224 treasury  
stocks with a nominal value of EUR 1 thousand and acquisition costs of EUR 28 thousand  
were redeemed in the reporting year. As of the reporting date, the Company held treasury  
stocks with a nominal value of EUR 1 thousand (previous year: EUR 1 thousand) and  
acquisition costs in the amount of EUR 19 thousand (previous year: EUR 28 thousand) from  
retired and former employees, as well as from employees who exercised the option allowing  
them to sell employee shares after a five-year holding period. 808 of these shares were  
repurchased in fiscal year 2021/2022.  
Investment subsidies  
The position „Changes in Investment Subsidies“ (Annex 3 to the Notes) shows the  
composition and movement over the year.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
263  
Company Annual Report 2021/2022 Audited Company Annual Report  
Provisions  
30.09.2022  
30.09.2021  
EUR 1,000  
EUR 1,000  
Provisions for severance payments  
1,974  
2,398  
Provisions for pensions  
10,776  
18,272  
Provisions for tax (thereof deferred taxes EUR 7,094 thousand; prev. year EUR 1,477 thousand)  
20,656  
13,827  
Other provisions  
45,987  
37,213  
79,393  
71,710  
Tax provisions  
The calculation of the deferred tax liabilities is based on a tax rate of 23% and 24.25%.  
Differences between the values recognised in the Statement of Financial Position for tax  
purposes and the commercial Statement of Financial Position only contain deferred taxes that  
have a limited term. Differences that remain on the accounts are assumed to be relevant for  
taxation. Deferred tax assets are offset against deferred tax liabilities.  
A provision for tax arrears in the amount of EUR 13,561 thousand (previous year:  
EUR 12,350 thousand) was formed for tax losses from Group members already utilised by the  
parent company.  
The deferred tax liabilities in the amount of EUR 7,094 thousand (previous year:  
EUR 1,477 thousand) are non-current liabilities.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
264  
Company Annual Report 2021/2022 Audited Company Annual Report  
The accrual item for deferred taxes results from differences between the commercial and tax  
balance sheets for expenses that will only become tax-deductible in future years. This item  
recognises the balance from deferred tax assets and liabilities to the extent the prerequisites  
for offsetting deferred tax assets from deferred tax liabilities have been met. The deferred tax  
item resulting from the difference between the commercial and tax balance sheets under  
corporate law is shown in the following:  
Statement of  
Financial  
Tax balance  
Change in  
Position  
sheet  
Difference  
deferred taxes  
30.09.2022  
30.09.2022  
2021/2022  
2021/2022  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Deferred tax assets:  
Inventory measurement  
0
1,793  
1,793  
189  
Cost of finance  
0
507  
507  
-87  
Provision for severance payments  
1,974  
1,375  
599  
-413  
Provision for pensions  
10,776  
5,967  
4,808  
-7,358  
Provision for early retirement  
1,072  
983  
89  
-147  
Provision for stepped pensions  
90  
89  
1
-13  
Provision for anniversary bonuses  
623  
430  
192  
-150  
Allowances in kind (electricity)  
6,916  
2,669  
4,247  
-133  
Allowances in kind (gas)  
123  
102  
21  
-119  
Current provisions  
35,926  
0
35,926  
7,038  
48,183  
-1,193  
Permanent differences from property, plant and  
equipment  
0
0
Deferred tax liabilities:  
Property, plant and equipment  
1,414,492  
1,383,272  
-31,221  
-25,589  
Measurement of receivables  
0
0
0
13  
Untaxed reserves  
0
47,718  
-47,718  
1,923  
-78,939  
-23,653  
Balance from deferred tax assets and liabilities  
30,755  
24,845  
Resulting deferred tax liability (23%-24.25%)  
7,094  
7,822  
Total deferred tax liabilities  
7,094  
7,822  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
265  
Company Annual Report 2021/2022 Audited Company Annual Report  
Other provisions  
The other provisions mainly comprise obligations to personnel (stepped pensions, anniversary  
benefits, early retirement benefits, electricity and gas used by employees), uncertain liabilities  
such as for the decommissioning of the Riedersbach coal power station, an environmental  
provision, a provision for impending losses from the 7Fields gas reservoir and obligations from  
emission allowances that must be surrendered.  
Obligations from outstanding supplier invoices are reported in the trade payables item.  
Certain obligations to personnel (accrued paid leave, accruals for holiday, vacation and other  
bonuses, etc.) are reported in the other liabilities.  
Liabilities  
Thereof  
Thereof  
Thereof  
Carrying  
remaining  
remaining  
remaining  
Thereof  
value  
term  
term  
term  
Secured in  
accrued  
30.09.2022  
< 1 year  
1-5 years  
> 5 years  
rem  
Type of  
liabilities  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
security  
EUR 1,000  
Bonds  
300,000  
0
300,000  
0
0
-
0
Previous year  
300,000  
0
300,000  
0
0
-
0
Liabilities to banks  
217,444  
109  
380  
216,956  
0
-
0
Previous year  
222,532  
5,108  
369  
217,055  
0
-
0
Advances received on account of  
orders  
0
0
0
0
0
-
0
Previous year  
154  
154  
0
0
0
-
0
Trade payables  
17,382  
17,382  
0
0
0
-
0
Previous year  
9,383  
9,383  
0
0
0
-
0
Liabilities to affiliated companies  
2,016,077  
1,754,581  
0
261,495  
0
-
0
Previous year  
1,167,104  
857,300  
67,500  
242,304  
0
-
0
Other liabilities  
75,139  
72,725  
2,064  
349  
0
-
17,899  
Previous year  
46,131  
43,286  
2,480  
364  
0
-
18,326  
2,626,042  
1,844,797  
302,444  
478,800  
0
-
17,899  
Previous year  
1,745,304  
915,231  
370,349  
459,724  
0
-
18,326  
The liabilities to affiliated companies in the amount of EUR 2,016,077 thousand (previous  
year: EUR 1,167,104 thousand) are broken down into trade liabilities with  
EUR 29,310 thousand (previous year: EUR 1,540 thousand), financial liabilities with  
EUR 1,733,205 thousand (previous year: EUR 913,077 thousand), the security deposit to Netz  
Oberösterreich GmbH with EUR 261,495 thousand (previous year: EUR 242,304 thousand),  
other liabilities with EUR 1,225 thousand (previous year: EUR 12,539 thousand), trade  
receivables with EUR 17 thousand (previous year: EUR 36 thousand), other receivables with  
EUR 9,141 thousand (previous year: EUR 2,320 thousand), with the latter including  
EUR 4,141 thousand (previous year: EUR 2,320 thousand) in receivables from the positive tax  
appropriation and EUR 5 thousand (previous year: EUR 0 thousand) of same-period  
distributions.  
Other liabilities to affiliated companies in the amount of EUR 1,225 thousand consist entirely  
of tax appropriation refunds to Group companies.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
266  
Company Annual Report 2021/2022 Audited Company Annual Report  
The greatest part of the remaining liabilities pertain to tax liabilities in the amount of  
EUR 28,681 thousand (previous year: EUR 8,211 thousand), liabilities concerning social  
security contributions in the amount of EUR 175 thousand (previous year:  
EUR 689 thousand), outstanding interest charges in the amount of EUR 12,999 thousand  
(previous year: EUR 13,216 thousand), as well as liabilities in relation to hedging transactions  
in the amount of EUR 26,300 thousand (previous year: EUR 16,900 thousand).  
Disclosures on financial instruments  
As of the reporting date, the derivative financial instruments are composed as follows:  
Fair value  
Carrying  
Contract  
Positive  
Negative  
amount  
Balance sheet  
value  
Term  
EUR 1,000  
EUR 1,000  
EUR 1,000  
item  
Interest swaps bond  
(fixed interest  
received)  
EUR 75 mill.  
2025  
836  
0
0
-
Previous year  
EUR 75 mill.  
2025  
1,244  
0
0
-
Interest swaps loans  
(fixed interest paid)  
EUR 37 mill.  
2023  
0
174  
0
-
EUR 32 mill.  
2028  
0
2,300  
0
-
EUR 100 mill.  
2035  
21,689  
0
-
EUR 172 mill.  
21,689  
2,474  
0
Previous year  
EUR 172 mill.  
2,443  
11,114  
0
Derivative financial instruments that are not recognised in the Statement of Financial Position  
are used to partially hedge the risks of interest rate changes inherent in bonds and loans. A  
provision item will be formed if there is no hedging relationship and the present value is  
negative. Negative market values of derivatives in a hedging relationship amounted to  
EUR 2,474 thousand and were not recognised in the accounts.  
The measurement of the swaps results from discounting the future cash flows (present value  
method) on the basis of an expected interest curve from 30 September 2022. The interest  
curve is provided by a department that is not involved in trading the respective financial  
instrument.  
The derivative financial instruments used for hedging purposes are regularly tested on  
effectiveness in order to assess their compensating effect and in turn the effectiveness of the  
hedging relationships.  
Construction cost subsidies  
This item primarily includes financing contributions received from electricity and gas  
customers.  
They are reversed through profit or loss over a 15 to 40 year period. Since the 2005/2006 and  
2015/2016 fiscal years, construction cost subsidies are collected at the time new electricity  
and gas connections are installed by Netz Oberösterreich GmbH.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
267  
Company Annual Report 2021/2022 Audited Company Annual Report  
Accruals and deferrals  
The deferred income and accrued expense items are essentially composed of the premium  
spread over the term of issued bonds and accruals of income received.  
Pursuant to § 124b para 270 letter a of the Austrian Income Tax Act, write-ups for  
investment securities in the amount of EUR 310 thousand not recognised in the  
2015/2016 fiscal year were transferred into a provision for value adjustments under tax law  
with effect on 1 October 2016 and recognised as deferred income pursuant to § 906 para 32  
of the Austrian Commercial Code (UGB).  
In accordance with the accounting changes from the Austrian Accounting Changes Act 2014  
(RÄG 2014), deferred taxes in the amount of EUR 32,016 thousand were reallocated to  
deferred income in the 2016/2017 fiscal year. They stem from shares in affiliated companies  
and are reversed over four fiscal years in accordance with § 906 para 34 of the Austrian  
Commercial Code (UGB), with the final reversal amount recognised in the previous year.  
Contingent liabilities  
Thereof to  
Thereof to  
affiliated and  
affiliated and  
associated  
associated  
30.09.2022  
companies  
30.09.2021  
companies  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
Guarantees from cash pooling  
1,698,754  
1,698,754  
800,587  
800,587  
Guarantees related to electricity trade  
415,808  
415,808  
57,905  
57,905  
Other guarantees  
55,998  
55,998  
58,509  
58,509  
Total guarantees  
2,170,559  
2,170,559  
917,001  
917,001  
Liabilities from bills of exchange  
2,000  
2,000  
2,000  
2,000  
2,172,559  
2,172,559  
919,001  
919,001  
Energie AG Oberösterreich assumed an obligation, in the form of a letter of guarantee, to  
ensure the contracting parties’ claims from the cash-pooling agreement. As of 30 September  
2022, these receivables amount to EUR 1,699 million. In consideration of Energie AG’s own  
pooling liabilities, the net financial guarantee item amounts to EUR 121 million. Letters of  
guarantee and letters of comfort were issued to the business partners of Energie AG  
Oberösterreich Trading GmbH in relation to energy trading transactions. The other guarantees  
pertain to assumptions of liability for loans that affiliated companies of Energie AG were  
granted from various financial institutions.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
268  
Company Annual Report 2021/2022 Audited Company Annual Report  
4. Notes to the Statement of Income  
Sales revenues  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Electricity  
35,577  
68,292  
Gas  
319,315  
102,425  
Other sales revenues  
235,315  
238,772  
590,208  
409,489  
The electricity and gas revenues result from the settlement of electricity procurement  
agreements and settlements from the 7Fields gas reservoir to Energie AG Oberösterreich  
Trading GmbH.  
The other sales revenues mainly include income from the reversal of construction cost  
subsidies, income from warehoused inventory used by Group companies, and lease payments  
for non-current assets and lease payments made to Group companies.  
Other operating income  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Income from the disposal and appreciation of non-current assets (excluding financial assets)  
296  
1,519  
Income from the reversal of provisions  
120  
-
Other  
2,936  
2,466  
3,352  
3,985  
The other operating income essentially consists of proceeds from the utilisation of investment  
subsidies, proceeds from insurance benefits, proceeds from capitalised production activities,  
proceeds from CO2 emissions allowances and proceeds from onward invoicing.  
Expenses for material and other purchased services  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Cost of materials  
391,469  
154,401  
Expenses for purchased services  
40,167  
37,027  
431,635  
191,428  
The most important items under “Cost of materials” are the electricity procured from  
electricity supply contracts that remained with Energie AG Oberösterreich, the use of gas, the  
cost of materials withdrawn from the inventories by Group companies, as well as materials  
procured from third parties.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
269  
Company Annual Report 2021/2022 Audited Company Annual Report  
Personnel expenses  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Wages  
4
1
Salaries  
8,289  
8,224  
Social security expenses  
4,447  
3,379  
Thereof expenses for pension payments  
578  
503  
Thereof severance payments and contributions to company pension funds  
119  
1,038  
Thereof expenses for statutory social security contributions and payroll-related levies and  
statutory contributions  
1,641  
1,682  
12,740  
11,605  
The item for salaries includes EUR 45 thousand (previous year: EUR 52 thousand) from  
changes in the provisions for anniversary bonuses. The change in the social capital provision  
due to changes in the actuarial interest rate has been recognised in the financial result since  
the reporting year. The previous year’s figure includes EUR 16 thousand due to the change in  
the actuarial interest rate.  
The expenses for severance payments and payments to company pension funds as well as the  
expenses for pension benefits include the actuarial profits from 2021/2022 in an amount of  
EUR 208 thousand (previous year: EUR 76 thousand actuarial losses). The change in the social  
capital provision due to changes in the actuarial interest rate has been recognised in the  
financial result since the reporting year. The previous year’s figure includes EUR -87 thousand  
due to the change in the actuarial interest rate.  
The interest expenses resulting from the provisions for severance payments, old-age pensions,  
anniversary bonuses, stepped pensions and early retirement benefits is reported in the  
financial result under interest and similar expenses.  
The expenses for severance payments and payments to company pension funds include  
expenses for members of the Management Board and senior executives amounting to  
EUR 40 thousand (previous year: EUR 39 thousand).  
The expenses for old-age pensions include expenses for members of the Management Board  
and senior executives in the amount of EUR 301 thousand (previous year: EUR 344 thousand).  
The expenses for pension payments consist of EUR 380 thousand related to contribution-  
based commitments (previous year: EUR 387 thousand).  
The item “Expenses for severance payments and payments to company pension funds”  
includes expenses for pension funds in the amount of EUR 84 thousand (previous year:  
EUR 81 thousand).  
Depreciation, amortisation and impairments  
Depreciation and amortisation expenses fully relate to non-current intangible assets and  
property, plant and equipment and are reported in the assets analysis. Write-downs in an  
amount of EUR 521 thousand was recognised for thermal plants in the reporting year. In the  
previous year, write-downs of EUR 241 thousand were recognised for buildings.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
270  
Company Annual Report 2021/2022 Audited Company Annual Report  
Other operating expenses  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Taxes other than income tax  
204  
198  
Other  
25,495  
27,249  
25,698  
27,446  
The other operating expenses comprise administrative expenses, allowances, insurance  
premiums, rental expenses, consultancy expenses, losses from the disposal of property, plant  
and equipment, and marketing expenses.  
The losses from the disposal of non-current assets amount to EUR 1,269 thousand (previous  
year: EUR 1,286 thousand) and essentially relate to redistribution systems, power plants, and  
gas supply systems.  
As the Company’s auditors are also the auditors of the Consolidated Financial Statements of  
Energie AG Oberösterreich, Linz, in which the Company is included (as a fully consolidated  
company), reference is made to the corresponding disclosures with regard to the expenses for  
the auditor in fiscal year 2021/2022 contained in that Company’s Notes to the Consolidated  
Financial Statements.  
Income from investments in other companies  
Income from investments in other companies in the amount of EUR 19,000 thousand  
(previous year: EUR 28,000 thousand) relate to profit disbursements in the same period.  
Other interest and similar income  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Change of discount rate for social capital  
7,746  
0
Interest  
205  
451  
Other  
31  
0
7,982  
451  
The change in the social capital provision due to changes in the actuarial interest rate has  
been recognised in the financial result since the reporting year. The previous year saw  
EUR -71 thousand included in personnel expenses due to the change in the actuarial interest  
rate.  
Other income of EUR 31 thousand (previous year: EUR 0) relates to the release of deferred  
income in accordance with § 906 para 32 of the Austrian Business Code  
(Unternehmensgesetzbuch, UGB).  
Income from the disposal and write-up of financial assets and current securities  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Income from the disposal financial assets  
0
22  
0
22  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
271  
Company Annual Report 2021/2022 Audited Company Annual Report  
Expenses from financial assets and current securities  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Write-downs  
1,357  
44  
Loss absorption  
19  
1,523  
1,376  
1,567  
EUR 687 thousand (previous year: EUR 10 thousand) of the write-down relate to securities  
held as current assets, EUR 620 thousand (previous year: EUR 34 thousand) to securities held  
as fixed assets and EUR 50 thousand (previous year: EUR 0) to the investment in  
Oberösterreichische Gemeinnützige Bau- und Wohngesellschaft mit beschränkter Haftung.  
The expenses resulting from loss-assumption arrangements amount to EUR 19 thousand  
(previous year: EUR 1,523 thousand).  
Interest and similar expenses  
This item includes the calculated interest expenses attributable to the provisions for severance  
benefits, pensions, anniversary bonuses, stepped pensions and early retirement benefits in the  
amount of EUR 240 thousand (previous year: EUR 308 thousand), and the interest income  
from plan assets in the amount of EUR 64 thousand (previous year: EUR 76 thousand).  
Income taxes  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Ongoing tax expenses  
3,670  
31,218  
Tax expenses from tax audit  
-1,150  
200  
Positive tax allocations  
-20,007  
-25,299  
Negative tax allocations  
4,013  
2,088  
Deferred tax liabilities  
7,822  
-6,703  
-5,652  
1,504  
Pursuant to the Tax Allocation Agreement, the option of settling losses carried forward was  
exercised and losses of  
EUR 1,215 of Energie AG Oberösterreich Umwelt Holding GmbH were absorbed in the previous year.  
The receivables from and liabilities to affiliated companies include receivables for outstanding  
tax allocation repayments from Group companies in the amount of EUR 2,174 thousand  
(previous year: EUR 1,825 thousand), as well as liabilities for additional tax allocation  
payments in the amount of EUR 10,208 thousand (previous year: EUR 13,301 thousand). The  
receivable reported for tax allocation refund from the Group parent, OÖ  
Landesholding GmbH, amounts to EUR 18,056 thousand (previous year: additional tax  
allocation payment of EUR 9,223 thousand).  
The difference of receivables or liabilities from tax allocations against the resulting tax  
expenses or income is due to advance payments received from the Group companies during  
the fiscal year.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
272  
Company Annual Report 2021/2022 Audited Company Annual Report  
Income or expense items of extraordinary magnitude or significance  
The individual items recognised in the Statement of Income do not contain expenses or  
income of an extraordinary magnitude or significance pursuant to § 237 para 1 subpara 4 of  
the Austrian Corporate Code, with the exception of the aforementioned write-downs  
recognised for property, plant and equipment.  
5. Other disclosures  
Other financial obligations  
Energie AG Oberösterreich has agreed to cover 100% of the annual loss of Wertstatt  
8 GmbH for the 2021/2022 fiscal year. The losses assumed from this entity amounts to  
EUR 19 thousand.  
On 17 October 2022, Energie AG Oberösterreich gave an undertaking to absorb the losses of  
Energie AG Oberösterreich Business Services GmbH, Energie AG Oberösterreich Tech  
Services GmbH, and Wertstatt 8 GmbH for fiscal year 2022/2023 and further issued a non-  
binding letter of comfort to these entities. This letter of comfort, which Energie AG  
Oberösterreich can only terminate after expiry of 24 months from signing, was not  
recognised in the Annual Financial Statements as of 30 September 2022, but may give rise to  
financial obligations for Energie AG Oberösterreich in fiscal year 2022/2023. In this context,  
another non-binding letter of comfort, terminable 24 months from the date of signing, was  
issued to Energie AG Oberösterreich Telekom GmbH on 28 October 2021.  
Corporate bodies, employees  
The remuneration of the Management Board and the Supervisory Board presents as follows:  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Management Board  
846  
827  
Former Management Board and their survivors  
705  
695  
Supervisory Board  
95  
94  
The average number of employees (FTE) in the fiscal year presents as follows:  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Employees  
68  
70  
The data pertaining to the members of the Management Board and the members of the  
Supervisory Board are disclosed separately (Annex 1 to the Notes).  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
273  
Company Annual Report 2021/2022 Audited Company Annual Report  
Unbundling  
In addition to the already existing functional and accounting unbundling, Energie AG  
Oberösterreich implemented the unbundling requirement under corporate law (statutory  
unbundling) by setting up legally autonomous companies during fiscal 2006/2007.  
Pursuant to § 8 para 3 ElWOG and § 8 para 3 GWG, the following disclosable transactions  
are executed with affiliated companies:  
Management of electricity and gas assets,  
Energie AG OÖ Trading GmbH  
trading services  
Electricity procured from third parties, energy Energie AG OÖ Vertrieb GmbH  
services,  
technical services, heat supplies  
Grid services  
Netz OÖ GmbH  
Fuel purchases  
Energie AG OÖ Umwelt Service GmbH  
Data/telecommunication  
Energie AG OÖ Telekom GmbH  
Commercial/legal services  
Energie AG OÖ Business Services GmbH  
Personnel management services  
Energie AG OÖ Personalmanagement GmbH  
Personnel leasing  
Energie AG OÖ Personal Power GmbH  
Cash pooling, financing  
Energie AG Group Treasury GmbH  
Provisioning of personnel  
Wertstatt 8 GmbH  
Assets, holding services  
Energie AG OÖ Vertrieb GmbH,  
Netz OÖ GmbH,  
Energie AG OÖ Erzeugung GmbH,  
Energie AG OÖ Telekom GmbH,  
Energie AG OÖ Trading GmbH,  
Energie AG OÖ Business Services GmbH,  
Energie AG OÖ Tech Services GmbH,  
Cogeneration-Kraftwerke Management  
OÖ GmbH,  
Energie AG OÖ Umwelt Holding GmbH  
The breakdown of the Statement of Financial Position as of 30 September 2022 and the  
Statement of Income for fiscal year 2021/2022 into the areas of electricity generation and  
electricity trade, electricity and gas grid and other activities (Annexes 6 and 7 to the Notes) in  
accordance with the breakdown principles described in Annex 8 to the Notes serves the  
purpose of establishing the capital structure for the cost audit by Energie-Control Austria for  
the regulation of the economic sectors electricity and natural gas.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
274  
Company Annual Report 2021/2022 Audited Company Annual Report  
Events after the reporting date  
No material events within the meaning of § 238 para 1 subpara 11 of the Austrian  
Commercial Code occurred after the balance sheet date.  
Proposed appropriation of the profit  
The Management Board proposes to distribute an amount of EUR 53,200,000.00 from the  
balance sheet profit in the form of a dividend payment of EUR 0.60 per each ordinary share  
and to carry the difference forward to new account.  
Linz, 5 December 2022  
The Management Board of Energie AG Oberösterreich  
Chief Executive Officer  
DDr. Werner Steinecker MBA  
Dr. Andreas Kolar  
Dipl.-Ing. Stefan Stallinger MBA  
Chairman of the Management Board  
Member of the Management Board  
Member of the Management Board  
CEO  
CFO  
COO  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
275  
Annexes to the Notes  
ANNEXES TO THE NOTES  
Corporate bodies  
Supervisory Board  
Markus Achleitner  
Chairman  
Mag. Stefan Lang, LL.M.  
Vice-Chairman  
Dr. Heinrich Schaller  
Deputy Vice-Chairman  
Dr. Miriam Eder, MBA  
Mag. Dr. Erich Entstrasser  
Mag. Dr. Christine Frauscher  
Mag. Florian Hagenauer, MBA  
Dipl.-Ing. Erich Haider, MBA  
Mag. Anna Maria Hochhauser  
(until 17 December 2021)  
Dr. Elisabeth Kölblinger  
(since 17 December 2021)  
Commercial Council Mag. Michaela  
Keplinger-Mitterlehner  
Mag. Kathrin Renate Kühtreiber-Leitner, MBA  
Member of Local Parliamentary Group Ing.  
Herwig Mahr  
(since 4 March 2022)  
Gertrude Schatzdorfer-Wölfel  
Thomas Peter Stadlbauer MSc MBA MPA  
(until 17 December 2021)  
Josef Walch  
Works Council representatives:  
Ing. Mag. Leopold Hofinger  
(until 21 April 2022)  
Mag. Dr. Regina Krenn  
Ing. Peter Neißl, MBA MSc  
Edith Schatzdorfer  
(since 21 April 2022)  
Ing. Bernhard Steiner  
Christian Strobl  
Gerhard Störinger  
Andreas Walzer  
Management Board  
KommR Ing. DDr. Werner Steinecker, MBA  
Chief Executive Officer, Chairman of the  
Management Board  
KommR Mag. Dr. Andreas Kolar  
Member of the Management Board  
Dipl.-Ing. Stefan Stallinger, MBA  
Member of the Management Board  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
276  
Company Annual Report 2021/2022 Audited Company Annual Report  
Changes in non-current assets  
Costs  
Disposals due  
Balance as of  
to  
Balance as of  
01.10.2021  
Additions reorganisation  
Disposals  
Transfers  
30.09.2022  
EUR  
EUR  
EUR  
EUR  
EUR  
EUR  
I.  
Intangible assets  
1. Procurement rights  
227,305,775.38  
1,689,316.65  
0.00  
0.00  
0.00  
228,995,092.03  
2. Other rights  
104,868,547.10  
6,085,228.60  
598,072.05  
784,526.48  
0.00  
109,571,177.17  
Total intangible assets  
332,174,322.48  
7,774,545.25  
598,072.05  
784,526.48  
0.00  
338,566,269.20  
II.  
Property, plant and  
equipment  
1. Electricity plants  
1. 1 Power plants, land and  
buildings  
474,546,671.71  
59,932.42  
0.00  
110,361.72  
378,595.23  
474,874,837.64  
Manufacturing plant and  
equipment  
595,681,028.98  
987,635.66  
0.00  
693,244.07  
3,535,816.20  
599,511,236.77  
Advance payments made  
and facilities under  
construction  
8,361,980.04  
4,204,101.75  
0.00  
316,102.08  
-5,119,150.62  
7,130,829.09  
Total power plant  
assets  
1,078,589,680.73  
5,251,669.83  
0.00  
1,119,707.87  
-1,204,739.19 1,081,516,903.50  
1. 2 Transformer and  
distribution systems  
Land and buildings  
153,031,954.62  
4,518,809.05  
0.00  
188,082.10  
3,957,717.17  
161,320,398.74  
Manufacturing plant and  
equipment  
614,206,869.09  
17,097,685.46  
0.00  
3,606,950.41  
11,370,502.60  
639,068,106.74  
Lines and cables  
1,406,914,117.38  
57,411,490.19  
0.00  
5,775,066.62  
35,465,463.26  
1,494,016,004.21  
Advance payments made  
and facilities under  
construction  
63,892,771.24  
17,295,112.11  
0.00  
67,169.42  
-51,227,147.79  
29,893,566.14  
Total transformer and  
distribution systems  
2,238,045,712.33  
96,323,096.81  
0.00  
9,637,268.55  
-433,464.76  
2,324,298,075.83  
Total electricity assets  
3,316,635,393.06 101,574,766.64  
0.00  
10,756,976.42  
-1,638,203.95 3,405,814,979.33  
2. Gas supply assets  
Land and buildings  
12,033,595.85  
124,293.19  
0.00  
36,772.02  
0.00  
12,121,117.02  
Lines and cables  
649,941,521.60  
5,478,347.41  
0.00  
104,402.33  
1,307,966.09  
656,623,432.77  
Gas stations and measurement  
systems  
66,250,838.91  
2,155,622.84  
0.00  
301,724.84  
253,211.03  
68,357,947.94  
Advance payments made and  
facilities under construction  
2,326,376.13  
747,316.81  
0.00  
0.00  
-1,561,177.12  
1,512,515.82  
Total distribution systems  
730,552,332.49  
8,505,580.25  
0.00  
442,899.19  
0.00  
738,615,013.55  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
277  
Company Annual Report 2021/2022 Audited Company Annual Report  
Accumulated depreciation, amortisation and write-downs  
Carrying amounts  
Disposals due  
Carrying  
Carrying  
Balance as of  
to  
Balance as of  
amount  
amount  
01.10.2021  
Additions reorganisation  
Disposals  
Transfers  
30.09.2022  
30.09.2021  
30.09.2022  
EUR  
EUR  
EUR  
EUR  
EUR  
EUR  
EUR  
EUR  
181,731,897.18  
1,247,512.67  
0.00  
0.00  
0.00  
182,979,409.85  
45,573,878.20  
46,015,682.18  
89,958,772.89  
3,416,327.65  
454,433.67  
704,727.26  
0.00  
92,215,939.61  
14,909,774.21  
17,355,237.56  
271,690,670.07  
4,663,840.32  
454,433.67  
704,727.26  
0.00  
275,195,349.46  
60,483,652.41  
63,370,919.74  
372,316,314.91  
6,112,696.78  
0.00  
4,949.16  
-5.64  
378,424,068.17  
102,230,356.80  
96,450,769.47  
551,908,674.50  
4,696,415.73  
0.00  
664,553.48  
-426,426.12  
556,366,962.87  
43,772,354.48  
43,144,273.90  
0.00  
0.00  
0.00  
0.00  
0.00  
0.00  
8,361,980.04  
7,130,829.09  
924,224,989.41  
10,809,112.51  
0.00  
669,502.64  
-426,431.76  
934,791,031.04 154,364,691.32 146,725,872.46  
114,319,509.40  
2,481,127.22  
0.00  
147,470.36  
0.00  
116,653,166.26  
38,712,445.22  
44,667,232.48  
432,903,754.87  
21,509,899.52  
0.00  
2,983,440.38  
426,607.59  
451,003,606.42  
181,303,114.22  
188,064,500.32  
948,478,645.39  
41,603,073.36  
0.00  
5,285,557.39  
0.00  
984,796,161.36  
458,435,471.99  
509,219,842.85  
0.00  
0.00  
0.00  
0.00  
0.00  
0.00  
63,892,771.24  
29,893,566.14  
1,495,701,909.66  
65,594,100.10  
0.00  
8,416,468.13  
426,607.59  
1,552,452,934.04  
742,343,802.67  
771,845,141.79  
2,419,926,899.07  
76,403,212.61  
0.00  
9,085,970.77  
175.83 2,487,243,965.08 896,708,493.99 918,571,014.25  
6,069,866.17  
213,011.98  
0.00  
16,945.99  
0.00  
6,265,932.16  
5,963,729.68  
5,855,184.86  
391,684,029.69  
12,319,171.95  
0.00  
85,400.72  
0.00  
403,917,800.92  
258,257,491.91  
252,705,631.85  
39,956,891.10  
2,281,965.66  
0.00  
214,532.74  
0.00  
42,024,324.02  
26,293,947.81  
26,333,623.92  
0.00  
0.00  
0.00  
0.00  
0.00  
0.00  
2,326,376.13  
1,512,515.82  
437,710,786.96  
14,814,149.59  
0.00  
316,879.45  
0.00  
452,208,057.10 292,841,545.53 286,406,956.45  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
278  
Company Annual Report 2021/2022 Audited Company Annual Report  
Costs  
Disposals due  
Balance as of  
to  
Balance as of  
01.10.2021  
Additions  
reorganisation  
Disposals  
Transfers  
30.09.2022  
EUR  
EUR  
EUR  
EUR  
EUR  
EUR  
3. District heat systems  
Land and buildings  
4,963,779.52  
0.00  
0.00  
0.00  
0.00  
4,963,779.52  
Manufacturing plant and  
equipment  
30,313,882.13  
162,111.93  
0.00  
165,969.86  
274,313.54  
30,584,337.74  
Lines and cables  
97,370,941.12  
1,717,378.73  
0.00  
28,886.79  
715,826.67  
99,775,259.73  
Advance payments made and  
facilities under construction  
1,109,160.97  
839,631.11  
0.00  
0.00  
-990,140.21  
958,651.87  
Total district heat assets  
133,757,763.74  
2,719,121.77  
0.00  
194,856.65  
0.00  
136,282,028.86  
4. Other facilities, furniture and  
fixtures  
Land and buildings  
90,869,207.04  
60,450.88  
0.00  
129,334.10  
1,676,413.97  
92,476,737.79  
Manufacturing plant and  
equipment  
425,507,127.14  
9,150,749.96  
104,627,284.86  
208,121.81  
1,186,480.05  
331,008,950.48  
Furniture and fixtures  
79,409,846.45  
6,810,090.20  
0.00  
2,426,798.63  
376,653.89  
84,169,791.91  
Advance payments made and  
facilities under construction  
14,174,478.76  
19,952,199.54  
7,034,327.85  
35,926.86  
-1,601,343.96  
25,455,079.63  
Total other facilities,  
furniture and fixtures  
609,960,659.39  
35,973,490.58 111,661,612.71  
2,800,181.40 1,638,203.95  
533,110,559.81  
Total property, plant and  
equipment  
4,790,906,148.68 148,772,959.24 111,661,612.71 14,194,913.66  
0.00 4,813,822,581.55  
III. Financial assets  
1. Shares in affiliated companies  
738,589,589.86  
200,000.00  
3,000,000.00  
779,250.49  
0.00  
735,010,339.37  
2. Loans to affiliated companies  
18,697,164.92  
20,113,938.31  
0.00  
5,101,690.54  
0.00  
33,709,412.69  
3. Investments  
23,293,508.40  
2897440.24¹⁾  
0.00  
0.00  
0.00  
26,190,948.64  
4. Non-current securities (book-  
entry securities)  
8,846,662.90  
0.00  
0.00  
0.00  
0.00  
8,846,662.90  
Total financial assets  
789,426,926.08  
23,211,378.55  
3,000,000.00  
5,880,941.03  
0.00  
803,757,363.60  
Total non-current assets  
5,912,507,397.24 179,758,883.04 115,259,684.76 20,860,381.17  
0.00 5,956,146,214.35  
1)  
Addition to investment due to reorganisation  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
279  
Company Annual Report 2021/2022 Audited Company Annual Report  
Accumulated depreciation, amortisation and write-downs  
Carrying amounts  
Disposals due  
Balance as of  
to  
Balance as of  
Carrying amount  
Carrying amount  
01.10.2021  
Additions  
reorganisation  
Disposals  
Transfers  
30.09.2022  
30.09.2021  
30.09.2022  
EUR  
EUR  
EUR  
EUR  
EUR  
EUR  
EUR  
EUR  
4,163,751.73  
45,163.95  
0.00  
0.00  
0.00  
4,208,915.68  
800,027.79  
754,863.84  
25,216,055.10  
904,106.66  
0.00  
165,969.86  
0.00  
25,954,191.90  
5,097,827.03  
4,630,145.84  
83,043,054.92  
1,995,208.11  
0.00  
722.17  
0.00  
85,037,540.86  
14,327,886.20  
14,737,718.87  
0.00  
0.00  
0.00  
0.00  
0.00  
0.00  
1,109,160.97  
958,651.87  
112,422,861.75  
2,944,478.72  
0.00  
166,692.03  
0.00  
115,200,648.44  
21,334,901.99  
21,081,380.42  
53,887,175.95  
1,491,576.86  
0.00  
77,910.72  
0.00  
55,300,842.09  
36,982,031.09  
37,175,895.70  
218,448,381.20  
15,623,280.53  
14,198,170.65  
141,506.17  
-175.83  
219,732,160.74  
207,058,745.94  
111,276,789.74  
67,533,201.13  
4,488,578.50  
0.00  
2,377,302.26  
0.00  
69,644,477.37  
11,876,645.32  
14,525,314.54  
0.00  
0.00  
0.00  
0.00  
0.00  
0.00  
14,174,478.76  
25,455,079.63  
339,868,758.28  
21,603,435.89  
14,198,170.65  
2,596,719.15  
-175.83  
344,677,480.20  
270,091,901.11  
188,433,079.61  
3,309,929,306.06 115,765,276.81  
14,198,170.65  
12,166,261.40  
0.00 3,399,330,150.82 1,480,976,842.62 1,414,492,430.73  
16,862,221.98  
0.00  
0.00  
0.00  
0.00  
16,862,221.98  
721,727,367.88  
718,148,117.39  
0.00  
0.00  
0.00  
0.00  
0.00  
0.00  
18,697,164.92  
33,709,412.69  
0.00  
0.00  
0.00  
0.00  
0.00  
0.00  
23,293,508.40  
26,190,948.64  
510,902.49  
619,977.02  
0.00  
0.00  
0.00  
1,130,879.51  
8,335,760.41  
7,715,783.39  
17,373,124.47  
619,977.02  
0.00  
0.00  
0.00  
17,993,101.49  
772,053,801.61  
785,764,262.11  
3,598,993,100.60 121,049,094.15  
14,652,604.32  
12,870,988.66  
0.00 3,692,518,601.77 2,313,514,296.64 2,263,627,612.58  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
280  
Company Annual Report 2021/2022 Audited Company Annual Report  
Changes in investment subsidies  
Reversal/  
Balance as of  
Allocation  
Disposals  
Transfers  
consumption  
Balance as of  
01.10.2021  
2021/2022  
2021/2022  
2021/2022  
2021/2022  
30.09.2022  
EUR  
EUR  
EUR  
EUR  
EUR  
EUR  
I. Intangible assets  
Other rights  
1,367,776.50  
0.00  
12,251.92  
0.00  
182,855.40  
1,172,669.18  
Total intangible assets  
1,367,776.50  
0.00  
12,251.92  
0.00  
182,855.40  
1,172,669.18  
II. Property, plant and  
equipment  
1. Electricity plants  
1. 1. Power plants, land  
and buildings  
8,004,252.55  
33,755.74  
0.00  
0.00  
734,894.22  
7,303,114.07  
Manufacturing  
plant and  
equipment  
656,731.43  
183,282.83  
0.00  
136,294.21  
125,212.48  
851,095.99  
Advance payments  
made and facilities  
under construction  
275,014.35  
88,529.76  
138,631.66  
-136,294.21  
0.00  
88,618.24  
Total power  
plant assets  
8,935,998.33  
305,568.33  
138,631.66  
0.00  
860,106.70  
8,242,828.30  
1. 2. Transformer and  
distribution systems  
Lines and cables  
84,500.00  
0.00  
0.00  
0.00  
13,000.00  
71,500.00  
Total transformer  
and distribution  
systems  
84,500.00  
0.00  
0.00  
0.00  
13,000.00  
71,500.00  
Total electricity  
assets  
9,020,498.33  
305,568.33  
138,631.66  
0.00  
873,106.70  
8,314,328.30  
2. District heat systems  
Land and buildings  
66,436.05  
0.00  
0.00  
0.00  
2,345.30  
64,090.75  
Manufacturing  
plant and  
equipment  
214,220.74  
0.00  
0.00  
0.00  
71,406.91  
142,813.83  
Lines and cables  
23,200.10  
0.00  
0.00  
0.00  
1,657.15  
21,542.95  
Total district heat  
assets  
303,856.89  
0.00  
0.00  
0.00  
75,409.36  
228,447.53  
3. Other facilities, furniture  
and fixtures  
Land and buildings  
205,527.57  
4,179.26  
0.00  
0.00  
10,643.77  
199,063.06  
Manufacturing  
plant and  
equipment  
351,913.52  
22,686.81  
124,588.78  
28,754.35  
28,437.94  
250,327.96  
Furniture and  
fixtures  
69,483.75  
14,056.56  
0.00  
0.00  
34,008.68  
49,531.63  
Advance payments  
made and facilities  
under construction  
63,398.55  
150,025.15  
29,755.09  
-28,754.35  
0.00  
154,914.26  
Total other facilities,  
furniture and  
fixtures  
690,323.39  
190,947.78  
154,343.87  
0.00  
73,090.39  
653,836.91  
Total property, plant and  
equipment  
10,014,678.61  
496,516.11  
292,975.53  
0.00  
1,021,606.45  
9,196,612.74  
Total investment subsidies  
(thereof allocated COVID bonus  
EUR 388,221.11)  
11,382,455.11  
496,516.11  
305,227.45  
0.00  
1,204,461.85  
10,369,281.92  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
281  
Company Annual Report 2021/2022 Audited Company Annual Report  
Cash Flow Statement 2021/2022  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Net cash flow from ongoing business activities  
Net profit for the year  
11,633  
63,458  
Gains from the disposal of assets  
-296  
-1,541  
Reversal of investment subsidies  
-1,358  
-1,497  
Reversal of construction cost subsidies  
-5,768  
-6,636  
Write-up of financial assets  
0
0
Appreciation of current securities  
0
0
Income from investments, securities and lendings as well as interest and similar expenses  
-4,268 1)  
-6,620 1)  
Losses from the disposal of assets  
1,323  
1,287  
Write-down of property, plant and equipment and intangible assets  
120,429  
123,108  
Change in social capital  
-6,902 2)  
-771 2)  
Change in other non-current provisions  
-316  
6,678  
Change in non-current provisions for deferred taxes  
7,822 3)  
1,301 3)  
Write-down of financial assets  
620  
34  
Write-down of current securities  
615  
10  
Cash flow from earnings  
123,535  
178,811  
Change in inventories  
-63,024  
2,762  
Change in other receivables and assets, deferrals and accruals (excl. financial receivables)  
42,708 4)  
12,950 4)  
Change in current provisions  
9,427  
11,229  
Change in advance payments received  
-154  
154  
Change in CO2 special item  
910  
0
Change in current liabilities and deferrals and accruals (excl. financial liabilities)  
46,367  
-29,897  
Change in non-current liabilities and deferrals and accruals (excl. financial liabilities)  
-610  
-976  
Cash flow from operations  
159,160  
175,033  
1) including phase-congruent distributions of EUR 19,000 thousand (previous year: EUR 28,000 thousand)  
2) exclusive of personnel transfer outside of profit or loss  
3) plus change in the deferred income for the reversal of deferred taxes  
4) less phase-congruent distributions of EUR 19,000 thousand (previous year: EUR 28,000 thousand)  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
282  
Company Annual Report 2021/2022 Audited Company Annual Report  
2021/2022  
2020/2021  
EUR 1,000  
EUR 1,000  
Cash flow from investing activities  
Investments into non-current assets  
-176,861  
-167,033  
Income from the disposal of non-current assets  
6,927  
11,147  
Income received from investments, securities and interest  
11,006  
2,808  
Investment subsidies received  
497  
1,015  
Construction subsidies received  
0
37  
-158,432  
-152,026  
Cash flow from financing activities  
Change in bonds and bank liabilities  
-5,087  
74,927  
Change in treasury stocks  
-19  
-28  
Distribution to shareholders  
-66,489  
-53,193  
Interest payments and similar expenses  
-25,738  
-24,188  
Purchase, sale of current securities  
-140,240  
0
Change in financial receivables and financial liabilities within the Group  
956,127  
147,258  
718,555  
144,776  
Cash flow from operations  
159,160  
175,033  
Cash flow from investment activities  
-158,432  
-152,026  
Cash flow from financing activities  
718,555  
144,776  
Change in cash and cash equivalents  
719,282  
167,783  
Cash and cash equivalents opening balance  
262,377  
94,582  
Transfer of personnel provisions to/from subsidiaries  
-144  
12  
Cash and cash equivalents closing balance  
981,515  
262,377  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
283  
Company Annual Report 2021/2022 Audited Company Annual Report  
Reorganisation balance sheets  
Takeover balance sheet pursuant to § 2 para 1 subpara 12 SpaltG  
as of 1 October 2021 of Energie AG Oberösterreich, Linz  
01.10.2021  
ASSETS  
EUR  
A. Non-current assets  
I. Financial assets  
0.00  
B. Current assets  
I. Receivables and other assets  
1. Trade receivables  
47,913.69  
2. Receivables from affiliated companies  
28,046,472.49  
3. Receivables from companies in which an interest is held  
0.00  
4. Other receivables  
22,842,451.00  
50,936,837.18  
II. Cash, credit balances with banks  
0.00  
50,936,837.18  
C. Accruals and deferrals  
0.00  
D. Deferred tax assets  
0.00  
50,936,837.18  
01.10.2021  
LIABILITIES  
EUR  
A. Spin-off capital  
3,000,000.00  
B. Investment subsidies  
39,037,217.93  
C. Provisions  
1. Provisions for severance payments  
0.00  
2. Provisions for pensions  
0.00  
3. Other provisions  
0.00  
0.00  
D. Liabilities  
1. Trade payables  
445,493.16  
2. Liabilities to affiliated companies  
7,851,034.09  
3. Other liabilities  
0.00  
8,296,527.25  
E. Construction cost subsidies  
603,092.00  
F. Accruals and deferrals  
0.00  
50,936,837.18  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
284  
Company Annual Report 2021/2022 Audited Company Annual Report  
Takeover balance sheet pursuant to § 2 para 1 subpara 12 SpaltG  
as of 1 October 2021 of OÖ Breitband Infrastruktur GmbH, Linz  
01.10.2021  
ASSETS  
EUR  
A. Non-current assets  
I. Intangible assets  
143,638.38  
II. Property, plant and equipment assets  
97,463,442.06  
III. Non-current financial assets  
0.00  
97,607,080.44  
B. Current assets  
I. Inventories  
0.00  
II. Receivables and other assets  
1. Trade receivables  
47,913.69  
2. Receivables from affiliated companies  
0.00  
3. Receivables from companies in which an interest is held  
0.00  
4. Other receivables  
23,001,216.46  
23,049,130.15  
III. Securities  
0.00  
IV. Cash, credit balances with banks  
0.00  
23,049,130.15  
C. Accruals and deferrals  
120,656,210.59  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
285  
Company Annual Report 2021/2022 Audited Company Annual Report  
01.10.2021  
LIABILITIES  
EUR  
A.  
Spin-off capital  
2,862,440.24  
B.  
Investment subsidies  
39,188,826.99  
C.  
Special item for emission allowances allocated free of charge  
0.00  
D.  
Provisions  
1. Provisions for severance payments  
0.00  
2. Provisions for pensions  
0.00  
3. Tax provisions  
0.00  
4. Other provisions  
0.00  
0.00  
E.  
Liabilities  
1. Bonds  
0.00  
2. Liabilities to banks  
0.00  
3. Advances received  
0.00  
4. Trade payables  
445,493.16  
5. Liabilities to affiliated companies  
75,351,034.09  
6. Other liabilities  
0.00  
75,796,527.25  
F.  
Construction cost subsidies  
603,092.00  
G.  
Accruals and deferrals  
2,205,324.11  
120,656,210.59  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
286  
Company Annual Report 2021/2022 Audited Company Annual Report  
Contribution balance sheet as of 1 October 2021 of Energie AG Oberösterreich, Linz  
(contribution of shares to Fiber Service OÖ GmbH)  
Under  
Under tax law  
commercial  
pursuant to  
law  
§ 15 UmgrStG  
01.10.2021  
01.10.2021  
ASSETS  
EUR  
EUR  
A. Non-current assets  
I. Non-current financial assets  
1. Investment OÖ Breitband Infrastruktur GmbH  
2,897,440.24  
-5,923,856.21  
2,897,440.24  
-5,923,856.21  
Under  
Under tax law  
commercial  
pursuant to  
law  
§ 15 UmgrStG  
01.10.2021  
01.10.2021  
LIABILITIES  
EUR  
EUR  
A.  
Incorporation capital  
2,897,440.24  
-5,923,856.21  
2,897,440.24  
-5,923,856.21  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
287  
Company Annual Report 2021/2022 Audited Company Annual Report  
Statement of Financial Position of Energie AG Oberösterreich as of  
30 September 2022 pursuant to § 8 ElWOG and § 8 GWG  
Electricity  
Total  
generation/  
Electricity  
for the  
sales  
grid  
Gas grid  
Other  
Company  
ASSETS  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
D.3.1.  
Total non-current assets  
368,561.3  
879,203.0  
292,931.0  
722,932.3  
2,263,627.6  
D.3.1.1.  
Intangible assets  
49,725.4  
11,155.1  
123.3  
2,367.1  
63,370.9  
D.3.1.2.  
Property, plant and equipment  
168,059.5  
846,090.4  
292,195.5  
108,147.0  
1,414,492.4  
D.3.1.3.  
Financial assets  
150,776.4  
21,957.4  
612.3  
612,418.2  
785,764.3  
D.3.2.  
Total current assets  
996,762.7  
115,304.8  
39,941.7  
131,550.9  
1,283,560.2  
D.3.2.1.  
Inventories  
77,521.2  
8,322.2  
4,147.2  
691.2  
90,681.8  
D.3.2.2.  
Total receivables and other assets  
11,441.7  
786.6  
249.5  
39,311.0  
51,788.9  
D.3.2.2.1.  
Trade receivables  
-9.3  
38.6  
0.0  
14.5  
43.8  
D.3.2.2.2.  
Receivables from affiliated companies  
5,816.7  
0.0  
0.0  
32,764.9  
38,581.7  
D.3.2.2.3.  
Receivables from companies in which an interest  
is held  
2,187.1  
0.0  
0.0  
5,169.6  
7,356.6  
D.3.2.2.4.  
Other receivables and assets  
3,447.2  
748.0  
249.5  
1,362.1  
5,806.8  
D.3.2.3.  
Securities  
30,307.4  
58,843.7  
19,695.6  
50,727.5  
159,574.3  
D.3.2.4.  
Cash, cheques, credit balances with banks  
877,492.4  
47,352.4  
15,849.4  
40,821.2  
981,515.3  
D.3.3.  
Accruals and deferrals  
136.1  
264.3  
88.5  
3,082.6  
3,571.5  
Total assets  
1,365,460.2  
994,772.1  
332,961.2  
857,565.8  
3,550,759.3  
Electricity  
Total  
generation/  
Electricity  
for the  
sales  
grid  
Gas grid  
Other  
Company  
LIABILITIES  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
D.3.4.  
Equity  
92,242.5  
360,121.8  
87,330.4  
248,933.6  
788,628.4  
D.3.6.  
Investment subsidies  
8,834.4  
73.6  
806.9  
654.4  
10,369.3  
D.3.7.  
Total provisions  
34,169.6  
7,904.6  
476.1  
39,012.3  
81,562.6  
D.3.7.1.  
Severance payments  
0.0  
0.0  
0.0  
1,973.8  
1,973.8  
D.3.7.2.  
Pensions  
0.0  
0.0  
0.0  
10,775.9  
10,775.9  
D.3.7.3.  
Other interest-bearing provisions  
0.0  
0.0  
0.0  
1,784.7  
1,784.7  
D.3.7.4.  
Other provisions  
34,169.6  
7,904.6  
476.1  
24,477.9  
67,028.3  
D.3.8.  
Total liabilities  
1,225,385.9  
623,552.6  
208,268.1  
568,835.5  
2,626,042.0  
D.3.8.1.1.  
Trade payables  
1.1  
4,319.8  
654.7  
12,406.3  
17,381.9  
D.3.8.1.2.  
Liabilities to affiliated companies  
1,072,649.6  
475,110.5  
133,527.1  
334,789.7  
2,016,076.9  
D.3.8.1.3.  
Liabilities to companies in which an interest is  
held  
0.0  
0.0  
0.0  
0.0  
0.0  
D.3.8.1.4.  
Other liabilities  
152,735.2  
144,122.2  
74,086.3  
221,639.6  
592,583.3  
D.3.9.  
Construction cost subsidies  
3,509.7  
3,119.5  
36,079.7  
122.7  
42,831.6  
D.3.10.  
Accruals and deferrals  
1,318.1  
0.0  
0.0  
7.3  
1,325.4  
Total liabilities and equity  
1,365,460.2  
994,772.1  
332,961.2  
857,565.8  
3,550,759.3  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
288  
Company Annual Report 2021/2022 Audited Company Annual Report  
Statement of Income of Energie AG Oberösterreich for the  
2021/2022 fiscal year pursuant to § 8 ElWOG and § 8 GWG  
Electricity  
Total  
generation/  
Electricity  
for the  
sales  
grid  
Gas grid  
Other  
Company  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
EUR 1,000  
1.  
Sales revenues  
382,008.3  
109,935.6  
27,643.8  
70,620.0  
590,207.8  
2.  
Change in inventory  
0.0  
0.0  
0.0  
0.0  
0.0  
3.  
Capitalised corporate services  
0.0  
0.0  
0.0  
0.6  
0.6  
4.  
Other operating income  
1,790.0  
127.5  
35.1  
1,398.9  
3,351.5  
5.  
Cost of materials and other services  
-369,131.6  
-9.7  
0.0  
-62,494.0  
-431,635.3  
6.  
Personnel expenses  
0.0  
0.0  
0.0  
-12,739.7  
-12,739.7  
7.  
Depreciation, amortisation and write-downs  
-15,491.6  
-78,757.4  
-15,459.7  
-10,720.4  
-120,429.1  
8.  
Other operating expenses  
-15,019.6  
-1,699.9  
-162.7  
-8,816.1  
-25,698.4  
9.  
Operating result (l. 1 to 8)  
-15,844.5  
29,596.0  
12,056.5  
-22,750.6  
3,057.4  
10.  
Income from investments in other companies  
5,106.5  
14.1  
18.6  
16,158.0  
21,297.1  
Income from other securities and  
11.  
lendings from the non-current financial assets  
118.9  
0.0  
0.0  
639.3  
758.1  
12.  
Other interest and similar income  
0.0  
0.0  
0.0  
7,981.6  
7,981.6  
Income from the disposal and write-up of financial  
13.  
assets and current securities  
0.0  
0.0  
0.0  
0.0  
0.0  
14.  
Expenses from financial assets and current securities  
0.0  
0.0  
0.0  
-1,375.7  
-1,375.7  
15.  
Interest and similar expenses  
-4,854.9  
-9,426.1  
-3,155.0  
-8,301.5  
-25,737.6  
16.  
Financial result (l. 10 to 15)  
370.5  
-9,412.1  
-3,136.4  
15,101.5  
2,923.5  
17.  
Earnings before taxes  
-15,474.1  
20,184.0  
8,920.1  
-7,649.1  
5,980.9  
18.  
Income taxes  
5,702.5  
-6,541.3  
272.9  
6,217.9  
5,652.1  
19.  
Earnings after taxes = net profit for the year  
-9,771.5  
13,642.7  
9,193.0  
-1,431.2  
11,633.0  
20.  
Reversal of retained earnings  
5,002.0  
19,720.1  
4,399.3  
12,435.0  
41,556.4  
21.  
Profit carried forward from the previous year  
0.0  
0.0  
0.0  
10.6  
10.6  
22.  
Balance sheet profit  
-4,769.6  
33,362.8  
13,592.4  
11,014.4  
53,200.0  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
289  
Company Annual Report 2021/2022 Audited Company Annual Report  
Reporting pursuant to ElWOG 2010 as amended and § 8 GWG 2011  
The UNBUNDLING concept is based on the use of SAP-R/3 with the “cost center” and “profit  
center” standard functions from the financial management with the support of the fixed  
asset accounting and cost accounting departments.  
All own power plants, the procurement rights, and the 7Fields gas reservoir have been  
allocated to the production sector.  
The Grid segment includes the 110 kV grid, the electrical substations, the medium and low-  
voltage grid, the transformer stations, the high-pressure and low-pressure natural gas grid,  
the gas pressure control and measuring stations, as well as the automated metering  
infrastructure. In the course of incorporating the “Grid” operational unit into Netz  
Oberösterreich GmbH in the 2014/2015 fiscal year, the operation of the distribution grid was  
leased out from Energie AG Oberösterreich.  
The general rule of directly allocating the assets and directly attributable capital to the  
individual segments in the Statement of Financial Position has been followed. In cases where  
the relationship to the individual activities was indirect, or a further breakdown would require  
a disproportionately great effort, the allocation was based on relevant and cause-related  
classifications.  
The static method was used for the allocation of capital. Interest-bearing liabilities have been  
allocated on the basis of the directly attributable net assets (total assets less cash/bank credit  
balances) in accordance with the overall situation in the company. The difference between  
calculated assets and directly or indirectly attributed capital was subsequently replenished  
from equity.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
290  
Company Annual Report 2021/2022 Company Management Report  
MANAGEMENT REPORT FOR THE  
2021/2022 FISCAL YEAR  
Energie AG Oberösterreich (Energie AG) is the holding company of the Energie AG Group.  
Energie AG Group is a leading Austrian infrastructure group of companies with the segments  
Energy, Grid, Waste Management, Czech Republic and Holding & Services. Energie AG  
assumes the role of a holding company and holds the majority of assets in the electricity and  
gas business as well as the intra-Group service companies as non-current assets. Due to the  
close ties between the Company and the Group as a whole, the following primarily  
represents the Group’s perspective.  
GENERAL CONDITIONS  
Economic environment 1)  
After a dynamic economic recovery in the first months of the reporting period, the  
2021/2022 fiscal year (1 October 2021 to 30 September 2022) at Energie AG Oberösterreich  
(Energie AG) was characterised by a series of crises of a political and economic nature. The  
outbreak of the Russian-Ukrainian war on 24 February 2022 exacerbated existing supply  
chain problems and price increases, provoking an energy and raw materials crisis along with a  
substantial acceleration of inflation, which had already been on the rise beforehand.  
This was followed by the first interest rate rises by the European Central Bank to curb  
historically high inflation. The financial markets expect further increases in key interest rates.  
Given the burgeoning risk of stagflation or recession in the major economies, the conflict of  
interests between fighting inflation and supporting the economy remains intense.  
Economic growth and inflation  
YoY real change (in %)  
Sources: IHS, WIFO, IMF  
1)  
Sources: IHS (Institute for Advanced Studies): › Fall Forecast of the Austrian Economy, 2022 – 2023, 7 October 2022. IMF (International  
Monetary Fund): › World Economic Outlook Database: October 2022 (imf.org), 17 October 2022. WIFO (Austrian Institute of Economic  
Research): › WIFO Economic Data – WIFO, 20 October 2022.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
291  
Company Annual Report 2021/2022 Company Management Report  
The Institute for Advanced Studies (IHS), the Institute of Economic Research (WIFO) and the  
International Monetary Fund (IMF) expect economic growth in the range of +2.7% to +3.1%  
for the euro area in 2022 (previous year: +5.3%).  
Current forecasts see growth in the Austrian economy of between +4.7% and +4.8% in  
2022. In the previous year, Austria’s gross domestic product (GDP) growth was +4.6%. The  
high inflation rate, mainly driven by energy and raw material prices is a cause for concern.  
After reaching +2.8% in 2021, the rate is expected to settle at between +7.7% and +8.5%  
in 2022. Having said this, the IMF is of the opinion that inflation rates are likely to peak at the  
end of 2022 in most countries, with inflation expected to remain at significantly elevated  
levels for some time after this.  
For the Czech Republic market relevant to Energie AG, an increase in the gross domestic  
product of between +1.9% and +2.5% is anticipated for the calendar year 2022 (previous  
year: +3.4%).  
Energy and climate policy environment  
In addition to a wide range of agenda decisions in the field of energy and climate policy, the  
reporting period was above all characterised by measures intended to cushion the impact of  
the energy price shock, reduce energy dependency on Russia and improve the security of  
supply.  
The aim of the EU Commission’s “Hydrogen and Gas Market Package”, as presented on  
15 December 2021, is to integrate renewable and decarbonised gases and hydrogen into the  
European legal framework. Moreover, the package includes requirements for regulating and  
unbundling hydrogen networks and strengthening consumer rights.  
On 2 February 2022, the EU Commission released the final wording of the complementary  
delegated act of the EU Taxonomy Regulation on technical assessment criteria for electricity  
and/or heat production with gas-fired power plants and from nuclear energy. The act  
classifies held-to-maturity investments in hydrogen-capable gas-fired power plants which  
continue to be operated with natural gas for a transitional period, and for which very strict  
emission limits were set, as a sustainable transitional activity. The overall objective of the  
Taxonomy Regulation is to redirect capital flows into sustainable investments by classifying  
economic activities in accordance with sustainability criteria.  
In May 2022, the Commission presented its previously announced “REPowerEU package” to  
rapidly reduce dependence on fossil fuel imports from Russia and accelerate the energy  
transition. The package also includes considerations relating to short-term market  
intervention, long-term market design reforms as well as recommendations for preparing for  
a major interruption to the gas supply.  
As part of the “Fit for 55” package, the European Parliament drafted reports on the  
Renewables and Energy Efficiency Directives in September 2022, calling for further  
acceleration in the expansion of electricity generation from renewables and a significant  
increase in energy efficiency ambitions. As early as June 2022, a European Parliament report  
on the revision of the EU emissions trading system was adopted.  
On 30 September 2022, the Commission’s proposed regulation on emergency measures was  
adopted in the Energy Council of Ministers. The material objective is to counteract price  
increases and relieve the burden on electricity consumers by setting targets for reducing  
electricity demand and for siphoning off and redistributing surplus revenues. The measures  
will come into force on 1 December 2022 and initially apply until 30 June 2023. The EU  
member states will be tasked with their detailed implementation.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
292  
Company Annual Report 2021/2022 Company Management Report  
In addition to this, a number of other energy policy directives were adopted at EU level during  
the reporting period. They include the communiqué on dealing with higher energy prices  
(“Toolbox”) and new EU Guidelines on State aid for Climate, Environmental protection and  
Energy (CEEAG).  
In Austria, the federal government and the electricity and gas utilities undertook a number of  
activities during the reporting period to alleviate the social hardship caused by the high  
energy prices. In February 2022, in the scope of the Electricity Industry and Organisation Act  
2010 (ElWOG), the National Council also standardised a legal entitlement for households and  
small businesses to instalment payments, in the face of additional payments for the annual  
electricity bill. On 7 September 2022, Austria’s federal government presented plans for an  
electricity cost subsidy law to ease the burden on household customers. This “electricity price  
cap” is intended to provide financial relief for basic consumption of up to 2,900 kWh per  
metering point for the period from 1 December 2022 to 30 June 2024.  
In January 2022, the Austrian National Council ratified the eco-social tax reform, thereby  
introducing national CO2 pricing for petrol, diesel, heating oil, coal and natural gas. The  
associated National Emissions Allowance Trading Act provides for graded CO2 pricing of  
sectors outside the EU emissions trading scheme, with this taxation to be offset by a climate  
bonus and other relief measures. The enactment planned for July 2022 was postponed to  
1 October 2022 by a resolution of the National Council.  
Also in January 2022, a minor amendment to the Renewable Energy Expansion Act (EAG)  
was passed in order to address previous state aid concerns voiced by the EU Commission. In  
April 2022, the first regulation for investment subsidies accompanying the EAG was adopted  
with details of subsidies for small photovoltaic, wind and hydropower plants.  
Three amendments to the Gas Industry Act stipulated, among other things, the establishment  
of a strategic gas reserve of 20 TWh by November 2022 and a set of instruments for the  
procurement of balancing energy with mandatory storage (Market Maker). The last  
amendment introduced a “use it or lose it” principle for systematically unused storage  
capacities, requiring all gas storage facilities on Austrian territory to be connected to the  
Austrian gas grid.  
As an economic steering act to be applied in a crisis situation, the amendment to the Energy  
Steering Act from June 2022 governs compensation for asset impairments in the case of  
steering measures for gas and electricity. On top of this, large consumers can now voluntarily  
store gas volumes, 50% of which are protected against expropriation in the event of steering.  
To further secure the gas supply in Austria, a Natural Gas Steering Measures Regulation was  
submitted for review in July 2022. This is intended to create the conditions for natural gas  
substitution with fuels such as coal, oil, or biomass for large consumers, district heating  
companies, and combined heat and power (CHP) plant operators subject to mandatory  
steering. A resolution has yet to be passed.  
The Gas Diversification Act was adopted at the end of June 2022 in order to cushion the  
additional costs of diversifying the procurement of natural gas from non-Russian sources and  
of converting plants for generating electricity, heat and/or cooling to alternative modes of  
operation. An amendment in July also provides additional financial support for switching  
from gas to other fossil fuels.  
A consultation draft for an amended Environmental Impact Assessment Act (UVP-G) was  
published on 25 July 2022. The aim of the amendment is to accelerate projects needed in the  
scope of the energy transition. Particular attention was paid to avoiding redundant audits and  
to improving the way in which procedures are structured, including the setting of deadlines  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
293  
Company Annual Report 2021/2022 Company Management Report  
by the authority. A further material proposal is that of considering the state of the art at the  
time a project is launched instead of that at the time of the decision as authoritative. This  
would lead to a differentiated view of the projects, especially in the case of renewable energy  
generation plants, prompted by rapid technological progress.  
Economic environment for the energy sector  
Price development on international energy markets  
Sources: EEX, ICE  
The forward market prices for electricity for delivery in 2023 in Austria showed a massive  
upward trend especially in the summer of 2022. The main factor influencing this was the  
price of gas, influenced by uncertainties surrounding the Russian-Ukrainian war and the  
associated reduction in supplies from Russia, and worries relating to the supply situation.  
Starting at around EUR 90.0/MWh at the beginning of the reporting period, electricity prices  
moved steeply upwards. The price for the annual base of 2023 in the price zone Austria  
reached its highest value on 26 August 2022 at EUR 1,015.0/MWh. The average price was  
EUR 247.3/MWh in the 2021/2022 fiscal year. On the spot market, electricity prices rose by  
around 300% compared with the same period of the previous year. The average European  
Power Exchange (EPEX) spot price base for delivery in Austria in the reporting period was  
EUR 259.5/MWh with a volatile development and with prices rising sharply from what was  
already a high starting level in the summer of 2022.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
294  
Company Annual Report 2021/2022 Company Management Report  
The oil price for delivery in December 2022 rose from a low of USD 66.0/barrel of Brent crude  
oil at the end of November 2021 to peak at USD 114.2/barrel on 8 June 2022. Up to  
February 2022, the increase can be explained by the global economic upswing following the  
slump caused by the COVID-19 pandemic; from February, the effects of the Russian-  
Ukrainian war predominated.  
In the autumn of 2021, the price increase for natural gas was still attributed to uncertainties  
in connection with the commissioning of the Nord-Stream 2 gas pipeline and the initially  
good economic outlook. From February 2022, the decline in gas supplies from Russia and  
increased demand as European gas storage facilities were filled led to a steep rise in prices.  
The Trading Hub Europe (THE) gas price for the front year 2023 rose in the fiscal year  
2021/2022 from around EUR 32.0/MWh at the beginning of October 2021, peaking at  
EUR 314.4/MWh on 26 August 2022, to EUR 185.6/MWh by the end of September 2022,  
showing lateral movement in the last few weeks of the reporting period.  
In the reporting period, prices for CO2 emission allowances fluctuated between EUR 54.9/t  
and EUR 98.0/t. After a continuous increase in prices up to February 2022 as a result of high  
demand, there was a slump at the beginning of the Russian-Ukrainian war due to  
uncertainties regarding economic developments. Subsequently, demand for electricity  
generation again caused CO2 prices to rise, with a need to compensate for low production  
levels from hydroelectric and nuclear power plants by increased use of coal and gas-fired  
power plants.  
Statutory and regulatory framework in the Grid Segment  
In addition to the operational challenges of implementing the Renewable Energy Expansion  
Act (EAG) package, grid operators are also feeling the effects of the current geopolitical  
situation and decarbonisation hype. This is reflected, for example, in the Electricity Segment  
by a further increase in demand for PV systems – on top of the aspects attributable to the  
incentives from the EAG package.  
The statutory environment was stable in the 2021/2022 fiscal year due to the fact that  
regulatory periods were still in effect until the end of 2022 for gas and until the end of 2023  
for electricity. Discussions are underway between E-Control Austria and industry  
representatives on formulating regulations for the subsequent periods starting in 2023 and  
2024. In the Gas Segment, the regulatory authority carried out a comprehensive cost review  
in the reporting period; the review forms the basis for the distribution grid operator  
benchmarks and cost path. Encouragingly, the gas division of Netz OÖ GmbH was confirmed  
as an efficient benchmark leader in the preliminary investigation report. This cost review is  
scheduled for fiscal year 2022/2023 for the electricity unit.  
The grid utilisation fees in the electricity sector increased by between 3.0% and 7.9% as at  
1 January 2022. This increase is attributable to high grid loss costs in the wake of rising  
energy market prices and higher upstream grid costs.  
The grid utilisation fees in the gas sector for consumers at grid level 3 rose by 5.5% as of  
1 January 2022. There was a substantial increase by 21.6% for end consumers at grid level 2.  
The reason for the increase was the roll-up of the regulatory parameters for the third  
regulatory period due to complaints filed by the Austrian Chamber of Commerce and the  
Federal Chamber of Labour. The procedure for 2020, which was still open, was decided on in  
the reporting period in line with previous procedures and is expected to be rolled up in future  
tariffs.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
295  
Company Annual Report 2021/2022 Company Management Report  
Economic environment for the waste management sector  
In the 2021/2022 fiscal year, the Waste Management Segment continued to benefit from  
what was, for the most part, a very good economic environment.  
Both nationally and internationally, the Circular Economy Package, formulated at EU level,  
continues to be the focus of attention. The Circular Economy Package amendment under the  
Waste Management Act (AWG) is intended to ensure waste avoidance, recycling, reuse, and  
product design geared towards sustainability. Targets in line with this for recycling, quotas for  
reusable and disposable packaging, requirements for the reduction of certain plastic products  
and on the issue of producer responsibility, incineration bans and landfill restrictions have  
been formulated and pose major challenges for the stakeholders.  
One of the focuses here is plastic packaging: in order to achieve the EU target of a 50%  
recycling rate in 2025, recycling must be doubled in the coming years. In addition, a new  
independent quota for separate collection of PET beverage bottles becomes mandatory as of  
2025. In order to be able to achieve these high targets, the Circular Economy Package, an  
amendment to the Waste Management Act, envisages the mandatory, staggered  
introduction of reusable packaging quotas in the food industry as well as a commitment on  
the part of the beverage industry to charge a deposit on PET and aluminium containers as of  
1 January 2025.  
Further provisions from the Waste Management Act (AWG) mandates that, starting on  
1 January 2023, waste transportation of volumes above 10 tonnes over distances of more  
than 300 kilometres must be effected by rail or similarly climate-friendly means of transport,  
with the kilometre threshold due to drop to 100 kilometres by 1 January 2026. Although the  
amendment offers opportunities, such as relieving the fraught situation in logistics services  
provoked by a lack of heavy goods vehicle drivers, however, it also entails economic risks.  
From 1 January 2023 onward, the amendment to the Packaging Regulation (VVO) requires  
commercial packaging placed on the market exclusively to be returned via a collection and  
recovery system. As a waste management company, Energie AG Oberösterreich Umwelt  
Service GmbH (Umwelt Service GmbH) would in future essentially be limited to logistics  
services for only a part of the paper and cardboard volumes. The concrete application,  
feasibility and potential financial impact are still uncertain due to numerous open issues  
relating to feasibility in practice.  
The positive trend from the previous year continued for the recyclable materials paper/  
cardboard and scrap metals. The Wiesbaden index for paper and cardboard packaging was  
even higher on average in the 2021/2022 fiscal year than in the previous year, meaning that  
higher sales revenues were achieved in the reporting period. However, a significant fall in  
prices was visible at the end of fiscal year 2021/2022. In the scrap metal sector, the average  
price for steel scrap was also significantly higher than one year earlier, peaking around the  
middle of the 2021/2022 fiscal year. At the end of the 2021/2022 fiscal year, although the  
price was lower than the starting price at the beginning of the fiscal year, however, it was still  
at a relatively high level.  
General conditions in the Czech Republic  
The COVID-19 situation in the Czech Republic increasingly eased during the  
2021/2022 fiscal year. Following this, the Czech government rescinded most of the measures  
to prevent the further spread of the COVID-19 pandemic.  
Although this had a positive effect on the economic development of the country, the  
generally difficult conditions on the energy market and the Russian-Ukrainian war on top had  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
296  
Company Annual Report 2021/2022 Company Management Report  
a negative impact on the economy. Inflation in the Czech Republic rose sharply during the  
reporting period, reaching a peak of 18% in September 2022. The unemployment rate  
settled near full employment during the 2022 calendar year.  
In the Water unit, a new price regulation between the operator and the infrastructure owner  
– in particular relating to the maximum permissible costing margin on drinking water, and  
wastewater charges – was agreed as of 1 January 2022. One significant innovation here is  
determining a permissible margin based on the replacement values of the non-current assets  
in operation. This will create sufficient funds for the owners to replace infrastructure.  
At the same time, the Czech regulatory authority for the heating sector enacted a change in  
heat pricing on 1 January 2022. Based on this, the maximum profit is now calculated, among  
other things, by the inflation-adjusted acquisition value of the assets in operation. From  
today’s perspective, these regulatory adaptations will not have any negative impact on the  
Czech Republic Segment.  
In the reporting period, the energy crisis with sharply rising market prices exposed trading  
companies for electricity and gas in particular to massive pressure, ultimately triggering  
insolvencies and the departure of numerous market participants; this also affected the Czech  
Republic Segment. This has led to further massive price increases for energy customers who  
now have to procure replacements at high prices on the spot market – in part for volumes  
that had already been secured. On top of this, energy suppliers are refusing to conclude new  
contracts in many cases. As a consequence the commodities to be procured are being  
distributed across several suppliers in order to minimise the risk of default.  
High gas prices were particularly relevant for the heating business of Energie AG’s Czech  
Republic Segment, as a large proportion of heat is generated by gas-fired boilers and  
combined heat and power plants. In the case of water supply and waste water management,  
higher market prices impacted on electricity expenses for water and waste water treatment  
and allocation. However, the remedial actions taken, including passing on the increased  
energy costs to the customers or damage agreements with the previous supplier, have  
substantially mitigated the impact.  
The Czech koruna steadily strengthened against the euro in the course of the  
2021/2022 fiscal year. The exchange rate was around EUR/CZK 24.6 towards the end of the  
reporting period.  
Changes under corporate law  
In the scope of bundling broadband activities in Upper Austria, the “Operations Layer 1” and  
“Operations Layer 2” operational units of Energie AG Oberösterreich Telekom GmbH  
(Telekom GmbH) were spun off for inclusion in Energie AG Oberösterreich under the  
demerger and acquisition agreement of 4 March 2022. The two operational units, including  
“Assets Layer 1”, were subsequently spun off from Energie AG Oberösterreich for inclusion in  
OÖ Breitband Infrastruktur GmbH, established in September 2021. The entity was renamed  
to Breitband Oberösterreich Infrastruktur GmbH.  
The next step was to transfer Energie AG Oberösterreich’s entire investment in Breitband  
Oberösterreich Infrastruktur GmbH to Fiber Service OÖ GmbH, which was renamed BBOÖ  
Breitband Oberösterreich GmbH, in return for a 50% participating interest in the latter.  
Energie AG Oberösterreich and OÖ Landesholding GmbH now each hold half of the shares in  
BBOÖ Breitband Oberösterreich GmbH.  
Additionally, the “Operation Layer 2” operational unit was spun off from Breitband  
Oberösterreich Infrastruktur GmbH for integration with BBOÖ Breitband  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
297  
Company Annual Report 2021/2022 Company Management Report  
Oberösterreich GmbH. Furthermore, the “Operation Layer 1” operational unit, including  
“Assets Layer 1” of BBOÖ Breitband Oberösterreich GmbH, was integrated with Breitband  
Oberösterreich Infrastruktur GmbH in the form of a shareholder contribution.  
Erdgas Oberösterreich Vertriebs GmbH, which operates on the German market, was sold by  
Energie AG Oberösterreich Vertrieb GmbH (Vertrieb GmbH) to Energie AG Oberösterreich  
Tech Services GmbH (Tech Services GmbH) with a closing date of 15 September 2022.  
As of 31 December 2021, all shares in Oberösterreichische Gemeinnützige Bau- und  
Wohngesellschaft mbH were sold to LAWOG – Gemeinnützige  
Landeswohnungsgenossenschaft für Oberösterreich eingetragene Genossenschaft mit  
beschränkter Haftung – and GVVG gemeinnützige Vermietungs- und  
Verwaltungsgesellschaft m.b.H.  
With a view to bundling heat activities in West Bohemia, the entities Energie AG Teplo  
Rokycany s.r.o. and Tepelné zásobování Rakovník, spol. s.r.o. were merged into Energie AG  
Teplo Bohemia s.r.o. on 1 October 2021.  
In addition to this, Energie AG Bohemia s.r.o. acquired a 100% holding in Czech heat  
company RATE s.r.o. on 3 January 2022.  
With a closing date of 2 August 2022, all shares in VAK Zápy s.r.o. were sold by Energie AG  
Bohemia s.r.o. to VAK Beroun a.s. A merger of VAK Zapy s.r.o. with VAK Beroun a.s. was  
planned for the start of the 2022/2023 fiscal year.  
EMPLOYEES  
Development of the workforce  
In the 2021/2022 fiscal year, the Group’s average consolidated workforce stood at 4,606 full  
time equivalents (FTE), thus representing an increase of 0.3% (13 FTE) over the average of the  
2020/2021 fiscal year (4,593 FTE).  
As of 30 September 2022 Energie AG Group had 4,630 employees (FTE, previous year:  
4,611) in three countries (previous year: three).  
The Group parent company Energie AG had an average of 68 employees (FTE) in the  
2021/2022 fiscal year, down from 70 FTE in the previous year.  
Change in the Management Board  
The Supervisory Board on 30 June 2022 appointed Dr. Leonhard Schitter M.A. to the  
Management Board for the period from 1 January 2023 to 31 December 2027 in the  
function of Board Member for Sales and Marketing. In this function he will take over from  
the current Chief Executive Officer DDr. Werner Steinecker MBA, who will retire at the end of  
the 2022 calendar year, and become the new Chairman of the Management Board of  
Energie AG.  
The Supervisory Board further reappointed Management Board Member KR Mag. Dr. Andreas  
Kolar in the function of Chief Financial Officer until 31 December 2025 as well as  
Management Board Member Dipl. Ing. Stefan Stallinger MBA as Chief Technology Officer  
until 31 December 2027.  
Thanks to the board members’ extensive knowledge of the company and industry it operates  
in, this new composition of the Management Board will assure the Group’s continuous  
further development.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
298  
Company Annual Report 2021/2022 Company Management Report  
Life and work at Energie AG  
Energie AG supports a good balance between work and family life. Except for the Waste  
Management and Czech Republic Segments, the Company has been certified via the  
“berufundfamilie” audit since 2012. This allows it to position itself as a family-friendly  
employer, gain advantages in the competition for skilled professionals, and help to create a  
positive working environment by means of the associated raft of measures for management  
and employees.  
The “Active Parental Leave Management” programme supports employees in Austria in  
planning the periods they will be off work. A nursing care platform offers comprehensive  
information and service links for employees who care for and support dependents. To make  
holiday planning easier, Energie AG supported its employees through the summer months of  
2022 by providing a varied programme for children between the ages of six and 12. Since  
July 2020, the cooperation with the Salzkammergut Hospital in Gmunden has been offering  
employees a year-round kindergarten for their children in addition to the daily bookable  
summer camp.  
The company’s in-house childcare facility (“Loomiland”) in the new corporate headquarters in  
Linz opened its doors in July 2022. The little ones are cared for by two qualified early  
childhood teachers from the Family Alliance Upper Austria (OÖ Familienbund). In addition to  
the child-friendly rooms with sophisticated designs, the facility offers exterior grounds of  
almost 300 m2 with play equipment, a sand pit and pavilions.  
In order to increase the awareness for Energie AG’s “Charter of agile, interdisciplinary  
cooperation”, numerous small groups discussed the contents’ relevance and derived areas  
with potential for optimisation.  
Many employees are active participants in one of the eleven culture & sport sections (fishing,  
hiking, family excursions, photography, football, cultural events, music, jogging, bike riding,  
sailing, skiing, rifle shooting, volleyball, scuba diving, tennis) and also establish private  
relationships with their colleagues.  
The survey “New ways to work from home” conducted within Energie AG in Austria returned  
positive feedback and resulted in the extension of the previous remote work model, making  
work more flexible.  
The revised works agreement concerning the granting of a paid “training period” was  
introduced in response to the newly arisen needs of employees in relation to training and  
professional development.  
Personnel and management development  
A key goal is to provide targeted services to prepare employees and managers for the  
challenges they will face in the working world of the future. The training programme  
2021/2022 offered employees a wide range of options to improve their own skills and  
competencies. In addition to a proven series of seminars, the programme was expanded by  
adding new contemporary contents, mainly in the area of methodology and media  
competence.  
The learning platform EINSTEIN offers an extensive training programme and is available 24/7  
to all employees and managers in Austria.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
299  
Company Annual Report 2021/2022 Company Management Report  
The focus in the area of methodological competence was on the wider field of  
“communication”. Various new seminars explored a range of aspects, e.g. the speaker’s  
voice, argumentation and quick-wittedness as well as the moderation of hybrid events.  
Occupational development  
Unit  
2021/2022  
2020/2021  
2019/2020  
Training per employee 1)  
Hours  
11.3  
8.6  
8.8  
Performance review rate  
%
69.3  
69.3  
74.2  
Apprentices  
Persons  
76  
76  
73  
Apprenticeships completed  
Persons  
17  
26  
16  
1) incl. hire personnel and apprentices, excl. training at the leadership academy and safety inductions  
Due to the success of the virtual “Digithek”, an element of the “Neuland 2021” digitalisation  
campaign, this programme will transition into a permanent format under the heading  
“Digithek 365”: a short seminar on a current IT topic will be offered once a month by an  
internal lecturer.  
The personnel development programme accessible via the EINSTEIN system offered various  
training opportunities in the areas of media competency and methodological competency,  
thereby making a significant contribution to keeping the employee’s know-how up to date,  
especially in the area of digital media and work methods, and securing their best work  
performance.  
A master thesis compiled in fiscal year 2021/2022 examined the conflict management system  
of Energie AG and evaluated it on the basis of surveys and their analysis. An accompanying  
seminar programme for groups and team managers is intended to raise the awareness for the  
topic and the instrument available to them. Employees were offered information events that  
also aimed at sensitising them for the topic.  
The Energie AG workforce was offered the online training on how to stay motivated and  
perform at work to support them during the COVID-19 pandemic, a situation that many staff  
members have experienced as extremely difficult. Employees were also enabled to engage  
with the topic “polarisation and opposites” in a webinar.  
Managing directors and departmental heads deliberated on the challenges related to good  
leadership during the COVID-19 pandemic in a day of reflection offered in cooperation with  
an external coach. An instrument that supports the teams in reflecting on their cooperation  
was made available in the form of the guideline titled “Healthy leadership”.  
The “Leadership Experience Discussion Circle” for team and group leaders was continued in  
the 2021/2022 fiscal year and consisted of three yearly sessions that deal with leadership  
topics in small groups that are guided by a coach. The group is intended to help attendees  
solve problems that arise in their day-to-day leadership roles, as well as encouraging these  
supervisory staff to be open to bouncing ideas off each other. The “Manager Group  
Coaching” continues to be the method of choice on the level of the managing directors and  
departmental heads.  
The competency model continues to form the basis for the feedback meetings between the  
Management Board/Managing Directors/heads of departments.  
The “Energie AG Future Lab” is an open and innovative format (workshops, seminars,  
excursions, lectures etc.) that aims at providing methodological and technical training to  
managerial personnel and also offers space to engage with future topics. Junior staff  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
300  
Company Annual Report 2021/2022 Company Management Report  
(PowerTalents) from Energie AG Group are involved in the programme in addition to  
Managing Directors and heads of departments.  
Maintaining the high quality of apprenticeship programmes  
Energie AG’s in-house apprenticeship programme is an important competitive advantage.  
Since 1943, 1,549 apprentices have successfully completed their training and become top-  
qualified specialists in their fields. About half of these are still employed in the Company  
today. In September 2022, 22 youngsters (previous year: 22), began their apprenticeships at  
Energie AG in the areas of electrical engineering and metals engineering, as well as for the  
first time in gas, water and heating technology. In keeping with our mission to promote  
diversity, apprentices of immigrant descent and asylum seekers also have their place in the  
Energie AG Group.  
The marketing activities have been significantly scaled up in districts with a higher demand  
for skilled workers (e.g. Schärding, Ried, Braunau). The apprenticeship trainers will pay  
personal visits to the polytechnic schools in these districts. A new advertising campaign is  
currently being developed and will be launched in future fiscal years.  
The cooperation with mandatory-attendance schools (electrical engineering polytechnic  
course, PowerGirls, Girls Day) as well as the offers for job shadowing took place in almost the  
same way as in the years before, despite the COVID-19 pandemic.  
Safety and health are especially important to Energie AG in its apprentice training. The  
Company offers professional workshops and seminars to provide guidance to young people  
on topics such as preventing addiction and using the internet safely, as well as since  
fiscal year 2021/2022 a three-part communication training that is spread across the full  
length of the apprenticeship programme.  
The most important milestone for an apprentice is the skilled worker examination at the  
Austrian Economic Chambers. The quality of training was also documented in the  
2021/2022 fiscal year, receiving an outstanding result. Between them, the 16 current  
graduates (previous year: 18) earned 10 distinction grades in vocational school and 13 good  
or outstanding results in their final examinations. At the Apprentice Awards held by the  
industrial sector in Upper Austria, the team of Energie AG apprentices in their second year  
took the first and third place in the category energy technology.  
With 22 new apprentices per year, the apprentice workshop continues to operate at  
maximum capacity. The modernisation of the building and its fitout was continued in  
fiscal year 2021/2022 with the start of the conversion of the mechanical workshop, the roof  
and the facade and will not be completed before the year 2025.  
The recruiting process is continuously adapted to the situation on the market. Due to a multi-  
faceted approach geared to the qualification, local demand and place of residence of the  
candidates, all apprenticeship positions were filled with qualified young talents.  
In 2018, Energie AG initiated the establishment of the “zukunft.lehre.österreich” association  
Future Apprenticeships Austria (ZLÖ). Its objective is to strengthen the image of  
apprenticeships in Austria. The role of president is currently occupied by its creator, Chief  
Executive Officer DDr. Werner Steinecker, MBA. Joining forces with the other members of the  
association, Energie AG aims to restore the status that apprenticeships deserve as a key  
foundation of business and, in turn, of society both today and in the future. Since 2018, we  
have worked meticulously to design and advertise an Austria-wide apprenticeship platform  
and an apprenticeship-related image campaign aimed at the target group.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
301  
Company Annual Report 2021/2022 Company Management Report  
Employer branding  
The age structure of the employees working in the Group entities and the challenges in  
recruiting suitable skilled personnel call on the Energie AG Group to employ a strategically  
coordinated recruiting and succession management that serves the purpose of making  
potential employees aware of the Company and of opportunities to apply for jobs at an early  
stage. In addition to continuing the general employer branding campaign, the  
2021/2022 fiscal year also focused on trainees and scholars. The sponsoring package for  
associations and clubs gives Energie AG Group the opportunity to harness the social circle of  
its employees to approach additional potential job candidates. The positioning of the  
employer brand was evaluated in workshops and interviews with staff members.  
Promoting diversity and women in technical careers  
Due to the great success achieved in the previous years, two more scholarships were awarded  
to female technicians in autumn 2021 (previous year: three). The scholars not only receive  
financial support, but can also complete internships at Energie AG and write their master’s  
thesis drawing on their experiences with the Company, potentially fostering strong ties  
between the Company and these scholars from an early stage.  
Diversity  
Unit  
2021/2022  
2020/2021  
2019/2020  
Women  
%
23.5  
23.5  
23.1  
Men  
%
76.5  
76.5  
76.9  
Women in management positions 1)  
%
14.6  
15.2  
15.8  
Men in management positions 1)  
%
85.4  
84.8  
84.2  
1) Definition of “management position”: Managing Directors, heads of departments, divisions, facilities, holding companies, corporate units, teams and groups.  
To ensure the Company is capable of mastering future challenges, it is important for  
Energie AG that its employees have the relevant skills at their disposal and for diversity to be  
embraced not only in recruiting, but also internally (for example, when filling management  
positions).  
Since 2014, Energie AG has been providing material and intellectual support to gifted and  
socially engaged pupils of immigrant origin through the START scholarship program, laying  
the foundations for these scholars to pursue academic study. This support covers the costs for  
(one-time) PC equipment, educational materials, seminar attendance, annual meetings, and  
regional events and workshops.  
Workplace health and safety  
The health and safety of employees is understood as an important success factor and  
promoted by targeted priority programmes and internal campaigns.  
Only healthy and satisfied staff can be successful with their work for a company. Energie AG  
works to ensure awareness and personal responsibility around the quality of work and  
occupational safety among its employees. In fiscal year 2020/2021, the internal campaign  
“100% safe” was launched to alert employees to potential hazards in their work  
environment and at the same time motivate them to contribute their own ideas on how to  
further improve work safety.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
302  
Company Annual Report 2021/2022 Company Management Report  
The “in-house psychological service hotline” of Energie AG Group offers employees free  
advice and help in conflicts, stress, work overload, anxiety, sleep disorders and personal crises  
(bereavements, sickness etc.). The service offers advice in person or over the phone and aims  
at carving out possible solutions that the employees can implement on their own.  
In accordance with § 4 of the Employee Protection Act (ASchG), potential hazards are  
ascertained and assessed by the respective managerial staff (or the responsible commissioned  
staff member pursuant to § 9 Administrative Penal Act (VStG)) and § 23 Work Inspection Act  
(ArbIG) with the help from the relevant work safety and occupational health experts. This forms  
the foundation for the determination of measures (workplace evaluation). The “Safety Manual”  
of the Austrian lobby group “Österreichs Energie” serves to evaluate individual activities.  
Shortcomings in the Austrian entities detected during the regular inspections pursuant to § 77a  
Work Safety Act (ASchG) are also assessed in accordance with a risk matrix pursuant to ISO  
45001:2018 (excluding the Waste Management Segment). The employees also rate their work  
activities on a risk matrix provided by the safety management in the form of training templates.  
Work accidents or incidents that almost resulted in an accident are investigated by the safety  
management in accordance with the Employee Protection Act insofar as an investigation  
appears expedient for the prevention of further accidents. This allows for the development of  
suitable measures, such as a change of work materials, work equipment, work processes,  
personal protective equipment, or more frequent inductions.  
Hazards and risks are reported to the direct line manager. Other persons (employer, safety  
expert, occupational health specialist etc.) are involved as required to identify these hazards  
and minimise risks as far as possible. In accordance with § 82 Employee Protection Act, the  
employees have access to all services offered by an occupational health specialist.  
As required under the Employee Protection Act, the involvement of safety liaison staff or the  
relevant employee representatives assures that the employees are involved in issues  
concerning work safety.  
The employer communicates safety-relevant issues to employees down the hierarchical levels  
in accordance with the organisational structure and in consultation with the safety liaison  
officer. The employees in Austria have access to a wide range of training options on work  
safety (e.g. e-learning modules on preventative fire protection, protection against falls, work  
in enclosed spaces; in-person events for construction site safety, working with electricity, and  
working with lifting equipment).  
Preventive action and information are used to prevent work-related adverse health conditions  
and staff are directed to be more conscious in their approach to health through the  
“energy@work” project. If an individual has already fallen ill, the Company takes steps to  
promote their recovery. Energie AG’s company health management policy was awarded the  
“Betriebliche Gesundheitsförderung bis 2022” (Workplace Health Promotion) seal of approval  
(except for the Czech Republic and Waste Management Segments).  
Numerous programmes contribute to safeguarding the employees’ health (e.g.“healthy 15  
minutes”, Medimouse (spinal) measurements, first aid courses, shiftwork fitness basics  
workshop).  
Topical issues are discussed and solutions are developed in regular health meetings including  
employee representatives, occupational health professionals and safety management  
specialists. Weekly exercise programmes at a number of work sites also promote health  
awareness. The range of occupational healthcare services includes extensive contact during  
consultation hours and vaccination campaigns. The results of the employee survey 2021 was  
followed up with a range of measures in the individual subsidiaries.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
303  
Company Annual Report 2021/2022 Company Management Report  
The first health day took place at the new building of Umwelt Service GmbH in Wels in the  
spring of 2022. Employees had the opportunity to have preventive medical check-ups with  
trained experts from the health sector at several stations, attend workshops and learn about  
healthy nutrition.  
Workplace safety  
Workplace safety  
Unit  
2021/2022  
2020/2021  
2019/2020  
Work accidents  
Number  
69  
70  
80  
Accident rate  
‰
14.10  
14.80  
16.20  
Days of sick leave  
Number  
19.90  
29.20  
32.40  
LTIF 1)  
8.29  
9.70  
9.35  
Deaths after work-related injuries  
Number  
0
0
1
Workplace and construction site inspections 2)  
Number  
157  
169  
52  
1) Lost Time Injury Frequency Index – frequency of work accidents per one million work hours  
2) Workplace and construction site inspections 2021/2022 and 2020/2021 excl. Czech Republic Segment 2019/2020 excl. Waste Management Segment and Czech Republic  
Segment  
Energie AG ensures that the specifications of the Employee Protection Act and the associated  
regulations are consistently observed throughout the Group, and that appropriate  
preventative measures are implemented. In the 2021/2022 fiscal year, the Group (excl. Czech  
Republic Segment) saw around 157 announced and unannounced workplace, external  
workplace and construction site inspections carried out by safety experts and occupational  
health professionals together with those responsible on site and/or Energie AG Group  
management as part of due diligence measures (previous year: 169). Office workplaces were  
reviewed to assure ergonomic design and, if necessary, adjusted to keep the number of  
musculoskeletal conditions among employees as low as possible.  
A total of 69 reportable work accidents were registered (previous year: 70), which  
corresponds to an accident rate of 14.1 accidents per 1,000 employees (previous year:  
14.8 accidents per 1,000 employees) 1). The accident severity amounted to an average of  
19.9 days of sick leave per work accident (previous year: 29.2). Converted to an international  
indicator value, this corresponds to an LTIF (Lost Time Injury Frequency) of 8.29 per 1,000,000  
working hours (previous year: 9.70). As in the previous year, there were no fatal work  
accidents.  
The legally required inductions with respect to health and safety at work and risk prevention  
steps are regularly held throughout the Energie AG Group. The short briefings were extended  
to include several new topics and are available for employees to access online.  
A large number of subject-specific training courses were conducted during the reporting  
period as part of due diligence measures. Employees of third-party contractors in the  
technical and electrical engineering sectors are also allowed to attend if they require  
additional training. In addition to training courses on “working with live electrical  
equipment” and operational use authorisation, training modules on low and high voltage  
electrical system operation and management authorisation were also offered, along with  
other safety-related topics such as working with lifting equipment.  
While the natural objective of the safety experts is to bring the rate and severity of accidents  
down to zero, they place great emphasis on potential work accidents with a high likelihood  
1)  
Up to cut-off date of 30 September 2022, including partially consolidated companies.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
304  
Company Annual Report 2021/2022 Company Management Report  
of occurrence and high severity of the potential injury. Approaching this number requires  
employees to receive the best possible training and the responsible colleagues to receive  
maximum support. Workplaces and activities are also subjected to a continuous evaluation  
and the necessary measures are adjusted as required.  
Energie AG takes workplace safety (i.e. potential hazards and risks in and around the  
buildings) very seriously. Building security inspections for all office, workshop and storage  
buildings are carried out annually to check how safe they are. The results of these inspections  
are to used to develop measures both to comply with legal requirements and to serve as a  
way of preventing hazards from arising in the first place.  
Branch offices  
Energie AG has no branch offices.  
ASSETS, LIABILITIES, FINANCIAL POSITION AND PROFIT OR  
LOSS (IN ACCORDANCE WITH UGB-CODE)  
Unit  
2021/2022  
2020/2021  
Change  
Sales revenues  
EUR mill.  
590.2  
409.5  
44.1%  
Operating result (EBIT)  
EUR mill.  
3.1  
59.9  
-94.9%  
EBIT margin  
%
0.5%  
14.6%  
-96.5%  
Earnings before taxes  
EUR mill.  
6.0  
65.0  
-90.8%  
Balance sheet total  
EUR mill.  
3,550.8  
2,724.0  
30.4%  
Equity  
EUR mill.  
788.6  
843.5  
-6.5%  
Equity ratio  
%
22.3%  
31.1%  
-28.3%  
Cash flow from operating activities  
EUR mill.  
159.2  
175.0  
-9.1%  
The sales revenues are EUR 180.7 million up on the previous year, amounting to  
EUR 590.2 million (previous year: EUR 409.5 million).  
A comparison with revenues in the previous year shows that intra-group gas sales have  
increased by EUR 216.9 million. Even though the volume withdrawn increased by 2.9% in a  
year-on-year comparison, the increase in sales revenue is mainly due to significantly higher  
average sales prices (+202.9%). Electricity revenues fell by EUR 32.7 million, a fact largely  
attributable to lower water levels compared with the previous year and high repurchase prices  
on the hedged volumes. At the pumped-storage power plants, sales revenues increased  
despite lower year-on-year volumes (-11.7%) due to higher market prices.  
EBIT was EUR 56.8 million lower than in the previous year and amounted to EUR 3.1 million.  
This is attributable to the differences in the sales revenues and the following other  
differences:  
The other operating income experienced a decline by EUR 0.6 million over the previous year.  
Expenses for materials and purchased services increased by EUR 240.2 million. Gas achieved  
higher sales revenues, while material expense increased due to higher gas purchases from the  
7Fields gas reservoir of EUR 215.0 million (2.9% volume increase and significant increase of  
procurement costs) and increased pumping costs in the amount of EUR 21.3 million (+19.8%  
volume increase and higher electricity prices).  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
305  
Company Annual Report 2021/2022 Company Management Report  
Personnel expenses were EUR 1.1 million higher than in the previous year. This is mainly due  
to the increase in the provision for staff electricity fees. The change in the social capital  
provision due to changes in the actuarial interest rate has been recognised in the financial  
result since the reporting year. The previous year’s figure for personnel expenses includes  
EUR -71 thousand due to the change in the actuarial interest rate.  
Depreciation and amortisation decreased by EUR 3.0 million, write-downs increased by  
EUR 0.3 million to EUR 0.5 million and concerned the district heating network and district  
heating generation plants in the reporting year.  
Other operating expenses decreased by EUR 1.7 million. The previous year’s recognition of a  
provision for impending losses at the 7Fields gas storage facility in the amount of  
EUR 6.7 million was offset in the reporting year by expenses of EUR 3.5 million in connection  
with the dissolution of the company death benefit fund. Expenses for software maintenance  
and compulsory union fees also increased.  
The financial result is EUR 2.9 million, a decrease of EUR 2.2 million over the previous year.  
The change is mainly the result of lower income from investments of EUR 8.3 million, higher  
write-downs of securities held as fixed and current assets of EUR 1.3 million and income of  
EUR 7.7 million due to changes in the actuarial interest rate used to calculate provisions for  
social capital. The change in the social capital provision due to changes in the actuarial  
interest rate has been recognised in the financial result since the reporting year.  
This amounts to earnings before taxes (EBT) of EUR 6.0 million (previous year:  
EUR 65.0 million).  
The balance sheet total in the fiscal year is EUR 3,550.8 million (previous year:  
EUR 2,724.0 million) and has increased by EUR 826.8 million (or +30.4%) over the previous  
year.  
On the assets side, property, plant and equipment decreased by EUR 66.5 million. Disposals  
of property, plant and equipment assets due to the spin-off of the “Operation Layer 1  
(including associated assets Layer 1) and Operation Layer 2” operational units of Energie AG  
Oberösterreich to OÖ Breitband Infrastruktur GmbH amount to EUR 97.5 million.  
The transformer and distribution systems account for the largest part of the investments in  
property, plant and equipment.  
Financial assets increased by EUR 13.7 million, mainly due to a loan being granted within the  
Group.  
Inventories increased by EUR 63.0 million, a fact primarily attributable to the changes in  
volume (+30.1%) and price (+288.6%) at the 7Fields gas storage facility.  
Receivables from affiliated companies and companies in which an interest is held increased by  
EUR 5.5 million. Receivables from an affiliated company resulting from the spin-off of the  
“Operation Layer 1 and Layer 2” operational units of Energie AG Oberösterreich Telekom  
GmbH to Energie AG Oberösterreich amounted to EUR 28.0 million. These receivables were  
netted with existing liabilities to this affiliated company.  
Other receivables and assets decreased by EUR 50.5 million, mainly due to the end of a CO2  
commission transaction in the previous year with receivables of EUR 49.2 million.  
Securities held as current assets increased by EUR 139.6 million and credit balances with  
banks by EUR 719.1 million.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
306  
Company Annual Report 2021/2022 Company Management Report  
Turning to the liabilities side of the balance sheet, equity decreased by EUR 54.9 million. This  
is attributable to the distribution of a dividend of EUR 66.5 million and the profit for the year  
amounting to EUR 11.6 million.  
The investment subsidies include the COVID-19 investment bonus of EUR 0.9 million.  
The provisions increased by EUR 7.7 million. The provisions for impending losses in  
connection with the 7Fields gas reservoir amount to EUR 7.4 million.  
Liabilities to banks decreased by EUR 5.1 million and were attributable to the repayment of  
long-term funding in an amount of EUR 5.0 million.  
Trade payables increased by EUR 8.0 million.  
The liabilities to affiliated companies increased by EUR 849.0 million over the previous year, a  
fact predominantly attributable to the higher netting and pooling liabilities to Energie AG  
Group Treasury GmbH in an amount of EUR 887.6 million. The netting and pooling liabilities  
include the netted receivables of EUR 28.0 million from the spin-off of the “Operation Layer 1  
and Layer 2” operational units of Energie AG Oberösterreich Telekom GmbH to Energie AG  
Oberösterreich. The changes in liabilities to affiliated companies include the disposal of a  
financial liability in the amount of EUR 67.5 million from the spin-off of the “Operation Layer  
1 (including associated assets Layer 1) and Operation Layer 2” operational units of Energie  
AG Oberösterreich to OÖ Breitband Infrastruktur GmbH.  
The other liabilities increased by EUR 29.0 million. This includes higher tax liabilities in the  
amount of EUR 20.5 million and liabilities from collateral annexes related to hedging  
transactions in the amount of EUR 9.4 million.  
Construction cost subsidies were EUR 5.8 million lower.  
Equity decreased by 6.5% over the previous year, the equity ratio (relating to the total capital  
less investment subsidies and special items for emission allowances) decreased by 28.3% to  
22.3%.  
The cash flow from operating activities amounts to EUR 159.2 million and decreased by 9.1%  
over the previous year. While the cash flow from earnings decreased by EUR 55.2 million, the  
working capital was EUR 39.4 million higher than in the previous year.  
FUNDING AND INVESTMENT STRATEGY  
The main focus of the funding and investment strategy of Energie AG continues to be on  
comprehensively maintaining the solvency of the Group at all times and on maintaining the  
Group’s good credit rating. Financial stability is of essential importance, especially in a phase  
of the greatest uncertainty with regard to the economic environment – particularly  
accentuated by massive distortions on the energy trading markets.  
The conservative orientation of the funding and investment strategy essentially rests on three  
pillars here:  
Securing a sustainably strong credit rating  
In February 2022, Energie AG again had its very good credit rating “A” confirmed by  
Standard and Poor’s. The “stable” rating outlook was also sustained. This strong credit rating  
enables the Group to obtain access to funding at optimal cost at any time, and to draw on a  
variety of different funding sources.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
307  
Company Annual Report 2021/2022 Company Management Report  
Stable and future-proof finances  
Financial liabilities were reduced by EUR 9.6 million to EUR 660.5 million in the past fiscal year  
(previous year: 670.1 million). The Group’s repayment profile is characterised by bullet loans  
with residual terms of up to 28 years. A significant refunding requirement will not arise again  
until the 2024/2025 fiscal year due to the scheduled repayment of a EUR 300 million bond.  
As of 30 September 2022, the Energie AG Group had EUR 929.4 million (previous year:  
219.2 million) in cash and cash equivalents. Beyond this, as of the reporting date, the Group  
had EUR 273.5 million (previous year: EUR 105.8 million) in fixed-term deposits and short-  
term investments, which are held as a strategic liquidity reserve. The risk profile of the  
strategic liquidity reserve is extremely conservative – a large proportion is held in cash or cash-  
equivalent instruments.  
In addition to these financial reserves from cash and cash equivalents as well as marketable  
securities, Energie AG had EUR 700.0 million (previous year: EUR 315.0 million) in partly  
committed credit lines with Austrian and international banks as of 30 September 2022,  
which had not been utilised as of the reporting date. The very high level of cash and cash  
equivalents compared with the previous years is mainly attributable to cash inflows from  
hedging transactions in electricity and gas trading. In the context of the sharp rise in energy  
prices and price volatility, the volumes of security deposits in energy trading have been  
significantly expanded. In view of the present turbulence on the markets, Energie AG  
regularly carries out stress tests in order to assess the impact of extreme market movements  
on the Group’s liquidity requirements and to be able to prepare for them.  
Central Group funding  
Group-internal funding management is handled centrally by Energie AG Group  
Treasury GmbH (Group Treasury GmbH). Financing within the Group is generally centralised,  
with the required funds being passed on to the Group companies at market conditions and in  
line with their requirements. In the short term, the liquidity of the Austrian Group companies  
is managed in the scope of a state-of-the-art cash pooling system. As of 30 September 2022,  
27 Group companies are involved in Group cash pooling, with Group Treasury GmbH acting  
as the pooling centre.  
VALUE-BASED CORPORATE MANAGEMENT AND CAPITAL  
COSTS  
Energie AG’s value management strategy is an instrument for measuring and controlling the  
economic success of the Group’s business activities. It serves to assess the attractiveness of  
investing activities and secures the company value as well as generating a capital market-  
oriented return for the owners. Along with the operating result, the weighted average cost of  
capital (WACC) is of essential importance. The WACC value serves as the basis for  
determining the minimum yield requirements for Group management and is therefore used  
as a yardstick for value generation in the Company.  
Energie AG calculates the cost of capital as the weighted average of equity and borrowing  
costs. The cost of equity is determined using the capital asset pricing model (CAPM).  
Calculations take into account the risk-free interest rate, a country risk premium, a market  
risk premium and a beta factor. Borrowing costs are composed of the risk-free interest rate, a  
country risk premium and the credit spreads of the peer group. The parameters specified by  
the regulatory authority are used for the regulated business units. The capital costs of the  
business units with activities on non-regulated markets are determined using the reporting-  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
308  
Company Annual Report 2021/2022 Company Management Report  
date principle and based on market conditions. In a further step, the bottom-up method is  
used to weigh these costs up unto the Segment and Group capital costs.  
This WACC method is subjected to on-going evaluation taking current publications and  
expert opinions into consideration. Adaptations are made as needed. Moreover, the costs of  
capital are continuously monitored against the background of a volatile financial market  
environment. The consolidated WACC value for the 2021/2022 fiscal year was 4.7%  
(previous year: 4.0%).  
Along with the operating result, one of the most important key indicators for the Group’s  
internal management is the ROCE (Return on Capital Employed), which indicates how  
efficiently and profitably the available capital is utilised. The ROCE is calculated as the  
quotient of Net Operating Profit After Tax (NOPAT) and average Capital Employed.  
The NOPAT key indicator denotes the taxed profit from operating activities excluding the at  
equity result of associated companies. One-time effects such as impairments and market  
valuations are taken into account and are included in the NOPAT. When calculating taxes, all  
at equity income is eliminated from the tax base, as the former is already adjusted for taxes.  
The capital employed is derived by subtracting the non-productive assets and non-interest-  
bearing liabilities from the average total assets. It reflects the interest-bearing capital pooled  
in the company. The average capital employed (ø CE) is calculated as the average of the total  
capital employed of the last two fiscal years. Capital employed includes the carrying amount  
of the investments accounted for using the equity method, excluding the associated strategic  
investments.  
The goal of the Energie AG Group is to generate an ROCE above the WACC through  
consistent value-oriented corporate management and control. The ROCE minus the WACC  
results in the relative value contribution. The absolute value added is calculated by multiplying  
it by the capital employed. In addition to the development of operating earnings, the level of  
ROCE and value added specifically depends on the capital employed. The NOPAT key  
indicator corresponds to EBIT less related taxes and other items, amounting to a total of  
EUR 97.7 million.  
In the Energie AG Group, in addition to strategic considerations, resources for future capital  
investments and acquisitions are allocated by prioritising projects exclusively on the basis of  
the presented value-oriented criteria and methods.  
In the 2021/2022 fiscal year, the ROCE of the Energie AG Group was 6.9%, 0.1 percentage  
points above the previous year (6.8%).  
TREASURY STOCKS  
By resolution of the Annual General Meeting on 17 December 2021, the share capital of  
Energie AG Oberösterreich was reduced by EUR 1,224.00 from EUR 88,653,782.00 to  
EUR 88,652,558.00 by means of a simplified capital reduction by cancellation of 1,224 no-  
par value registered shares of treasury stock in the form of non-voting preferred shares. As a  
result, § 4 of the Company’s Articles of Association was amended accordingly.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
309  
Company Annual Report 2021/2022 Company Management Report  
In certain cases, the Energie AG Oberösterreich employee stock option plan provides for the  
right or the obligation to purchase Energie AG employee shares. In fiscal year 2021/2022, the  
following changes in treasury stock resulted from this security:  
Share in  
Share in  
Treasury stocks  
capital stock  
capital stock  
Treasury stocks  
Shares  
%
EUR 1,000  
Treasury stocks as of 30.09.2021  
1,224  
0.001  
1.2  
Disposals 2021/2022  
-1,224  
-0.001  
-1.2  
Additions 2021/2022  
808  
0.001  
0.8  
Treasury stocks as of 30.09.2022  
808  
0.001  
0.8  
INTERNAL CONTROL SYSTEM  
The internal control system (ICS) is a process embedded in the work and operating  
procedures of the Energie AG Group which is being implemented by management and staff  
in order to identify and control existing risks and to be able to ensure with sufficient certainty  
that the following general objectives are achieved in the course of fulfilling the tasks of the  
Group:  
Effectiveness and efficiency of business activities  
Regularity and reliability of internal and external reporting  
Compliance with the internal regulations applicable to the Company and the pertinent  
legal provisions, in particular for the accounting process  
In the Energie AG Group, the roles “Group Treasury”, “Group Accounting” and “Controlling  
and Risk Management” have been established as company holding roles. The “Accounting”  
department acts as a service provider for the entire Group and is established in scope of  
Energie AG Oberösterreich Business Services GmbH (Business Services GmbH). The basis for  
the valid financial reporting is a strongly IT-supported process as well as a high degree of  
standardisation in data acquisition and processing, starting with commercial services, through  
the preparation of the companies’ annual reports, to consolidation in the consolidated  
financial statements. The above-mentioned functions thus form the core of the ICS control  
environment with regard to the accounting process.  
The core processes of the above-mentioned divisions, and the process-inherent material risks  
along with the appropriate controls, are documented and recorded using a suitable IT tool.  
Since the 2020/2021 fiscal year, this IT tool links the areas of quality, safety and  
environmental management (QSE), ICS, data protection, risk management and information  
and communication technology (ICT) risks and has established itself as a valuable information  
system for managers and employees.  
The concrete design of the controls is adapted to individual requirements which adequately  
consider risks and can include both manual and automated components. The dual control  
principle is strictly applied to approval processes. Conflicts of functional separation are  
avoided and monitored by compensatory controls.  
Continuous monitoring and a cyclical audit of the design and effectiveness of the controls by  
Group Internal Audit form the basis of quality validation and monitoring for these systems  
throughout the Group.  
Structured, standardised reporting to the Management Board and supervisory bodies ensures  
that the legally prescribed monitoring tasks are performed.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
310  
Company Annual Report 2021/2022 Company Management Report  
Control awareness is well anchored in the operating units and is sustainably implemented in  
the business processes. In addition, maintaining and strengthening risk awareness and  
awareness of the importance of the ethical values laid down in the vision and mission  
statement is an essential component of the corporate governance culture.  
The legal obligation to equal treatment in accordance with ElWOG and GWG 2011 (Natural  
Gas Act) are subject to appropriate ICS controls and are monitored by the Equal Treatment  
Officer.  
The ICS thus satisfied the statutory requirements in the year under review.  
RISKS AND OPPORTUNITIES  
Energie AG’s risks and opportunities situation was strongly influenced in the  
fiscal year 2021/2022 by the tense economic environment for the energy sector and the  
energy policy. There was a noticeable increase in the volatility of electricity and gas prices on  
the markets. New all-time highs were continuously reported. These developments were  
aggravated by both direct and indirect effects due to the Russian-Ukrainian war and the  
inflationary economic environment. Further to this, the climatic conditions and general  
climate policy, the potential further impact of the COVID-19 pandemic, and imminent  
regulatory changes have a significant impact on the risks and opportunities of Energie AG.  
Also, the details of the impact of the national implementation of the EU Emergency Measures  
Regulation on the absorption and redistribution of surplus proceeds as stipulated by the EU  
Commission cannot be predicted at this time.  
At the end of February 2022, a separate task force was established at Energie AG in order to  
continuously monitor and assess the risk of a potential gas shortage, attributable for the most  
part to the Russian-Ukrainian war. Situation reports are prepared at regular intervals,  
contractual relationships are analysed, and any risks are noted. Energie AG received its  
purchased gas volumes on schedule during the reporting period and was able to fill its own  
storage facilities to over 90% by the end of the 2021/2022 fiscal year.  
The typical risks associated with operating activities (fluctuations in electricity prices or the  
water level) proved to be higher in the course of the fiscal year 2021/2022 than in previous  
years due to price increases. At the same time, however, the opportunities arising from these  
issues increased. Energie AG relies on targeted strategic and operational measures to  
minimise or mitigate these risks and to leverage opportunities in the best possible way.  
Within the scope of ordinary activities, there is also the risk of trading partners not being able  
to meet their financial obligations in good time or defaulting altogether. Counterparty risk  
management at Energie AG focuses on particularly careful monitoring of counterparty limits/  
exposures and the implementation of risk mitigation measures.  
The reliability of medium- to long-term forecasts is currently limited due to volatile energy  
markets and uncertainties in energy policy. In the Energie AG Group, however, no risks were  
identified in the fiscal year 2021/2022 that, either individually or collectively, would have the  
potential to jeopardize the continued existence of the Company.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
311  
Company Annual Report 2021/2022 Company Management Report  
Significant opportunities (+) | risks (-) 1) and measures  
STRATEGIC OPPORTUNITIES | RISKS  
PROJECT OPPORTUNITIES | RISKS  
High, long-term investment costs, projects with a  
+|− Strategic opportunities | risks due to  
high level of complexity  
Changes in general climatic conditions  
Extreme events and their consequences  
Underruns and overshooting of the planned  
(periods of heat | drought, flooding, storms,  
values in terms of timing schedule, project costs  
hail, forest fires, avalanches)  
and quality  
Long-term changes in climatic and ecological  
(Energy) policy uncertainty  
conditions (precipitation frequency/volume,  
Measures:  
increase in average temperatures)  
Project management  
Changes in the general energy policy and energy  
Risk management methods in the entire project  
market environment  
cycle  
Changes in technological developments, in the  
Optimised contract arrangements  
market environment, in customer needs …  
Measures  
SUSTAINABILITY OPPORTUNITIES | RISKS  
Continuous intensive monitoring of energy policy  
In the medium term – in our 5-year planning horizon  
developments, markets, competitors, customers,  
– we assume that climate-related opportunities |  
the climate and  
risks will remain within the statistical range of the  
technologies  
past few years, and these have been taken into  
Participation in research projects, …  
account in our (opportunities | risks) scenarios.  
Early and intensive monitoring of strategic  
opportunities | risks  
Potential long-term climate-related risks and  
opportunities beyond this have been taken into  
account in strategic decision-making.  
VALUE OF ASSETS – OPPORTUNITIES & RISKS  
Environmental, social and governance (ESG) aspects  
Write-ups and write-downs of assets,  
are becoming increasingly important factors in the  
procurement rights, investments  
risk management process  
Allowances for receivables  
Creation of provisions for impending losses  
Opportunities|risks that may affect questions of  
sustainability as a result of Energie AG’s business  
Measures:  
activities.  
Ongoing monitoring, sensitivity analyses  
Long-term contracts  
Counterparty risk management  
1)  
Risk|opportunities, definition:  
- A risk is the possibility of an event occurring which has a negative impact on targets (EBT, EBIT, cash flow)  
- An opportunity is the possibility of an event occurring which has a positive impact on targets (EBT, EBIT, cash flow)  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
312  
Company Annual Report 2021/2022 Company Management Report  
MARKET AND COMPETITION RISKS  
+|− Market price changes  
+|- Market price and volume changes in waste  
management  
(electricity, gas, biomass and CO2 emissions  
Recycling materials, industrial waste, domestic  
allowances prices)  
waste, delivery prices, thermal, …  
Measures:  
Increased competition from pretreatment plants  
Bundled management of commodity price risks by  
and industrial co-incinerators  
Energie AG Oberösterreich Trading GmbH  
Increased re-municipalisation efforts of municipal  
Risk strategies geared for the market environment  
waste management associations  
Leveraging of internal synergies within the Group  
Measures:  
Long-term indexed contracts with defined delivery  
volumes and prices  
+|- Electricity generated from  
Focused market activities  
Hydroelectric power influenced by development of  
Intensification of cooperation with the public  
weather/climate  
sector  
Measures  
Further development of the digitalisation projects  
Optimised management of generation portfolio  
+|- Contractual losses|gains and contract changes in  
the water|wastewater sector  
+|- Electricity production from thermal power  
plants  
Measures:  
Measures:  
Synergy projects  
Ongoing participation in (concession) tenders  
Bundled management of commodity price risks by  
Energie AG Trading  
Long-term contracts  
Leveraging of internal synergies within the Group  
Risk strategies geared for the market environment  
+|- Electricity, gas, heat and telecommunications  
services sales volumes  
influenced by development of weather/climate,  
competition, economy, policy, ...  
Measures:  
Bundling of sales organisations  
Price guarantee  
Service and subsidy offerings  
Focus on digitalisation  
Positioning as an energy service provider  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
313  
Company Annual Report 2021/2022 Company Management Report  
OPPORTUNITIES/RISKS FROM BUSINESS OPERATIONS  
- Facility risks  
- Risks from information security, cyber-security  
and data protection  
Impairment of the availability of facilities due to  
Measures:  
Technical malfunctions, sabotage, …  
Optimised insurance strategy  
Natural disasters such as storms, flooding, …  
Comprehensive technical measures  
Measures:  
Management systems for information security  
and data protection  
Maintenance and quality controls  
Optimised maintenance strategy  
Structural (flood) protection measures  
- Personnel risks  
Strategy programmes “Replacing overhead  
Health and safety risks for company staff and  
medium-voltage lines that are particularly  
temporary employees  
susceptible to disruption with underground  
Loss of expertise and practical knowledge  
cable”, “Replacing low-voltage lines”, consistent  
expansion of grid automation  
Measures:  
Crisis and contingency management  
Safety training courses for employees  
Insurance  
In-house health management project  
energy@work  
Apprenticeship|trainee programmes  
+|− Physical weather risks  
“Human Resource Management”, “Management  
such as periods of heat|drought, flooding, storms,  
by Objectives” and “Management Academy”  
hail, forest fires, avalanches and their impact on  
Group policies  
third parties  
Measures:  
Structural (flood) protection measures  
Strategy programmes “Replacing overhead  
medium-voltage lines that are particularly  
susceptible to disruption with underground  
cable”, “Replacing low-voltage lines”, consistent  
expansion of grid automation  
Crisis and contingency management  
Insurance  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
314  
Company Annual Report 2021/2022 Company Management Report  
POLITICAL, REGULATORY AND STATUTORY OPPORTUNITIES/  
RISKS  
+|− Changes in the statutory environment  
+|- Political and statutory environment  
for the electricity and gas grids  
EU climate policy provisions and their  
implementation in Austria  
Measures:  
Statutory environment for project development  
Intensive and constructive dialog with the  
and implementation  
regulatory authorities  
Changes to subsidy regime  
Cooperation with interest groups  
Measures:  
Intensive and constructive dialog with authorities  
+|- Legal risks  
and politicians  
Cooperation with interest groups  
from pending legal disputes  
Measures  
Legal support  
Provisions in the balance sheet  
Out-of-court settlements  
COMPLIANCE RISKS AND DATA PROTECTION INFRINGEMENTS  
- Compliance risks  
- Data protection infringements  
Antitrust and corruption risks  
Accidental or unlawful destruction, loss, alteration  
or disclosure of data  
Financial market compliance  
Hacker attacks  
Measures:  
Measures:  
Group policies “Compliance Management  
System” and “Anti-Corruption”, “Handling on  
Group policies “Data Protection Management  
Insider Information”, “ICT Information Security  
System” and “Data Protection Compliance Policy”  
Management”  
In-person training and e-learning courses  
In-person training and e-learning courses  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
315  
Company Annual Report 2021/2022 Company Management Report  
FINANCIAL RISKS  
+|- Changes in interest rates  
+|- Opportunities|Risks from investments in other  
companies  
Measures:  
Fluctuations in the returns on investments  
Long-term fixed interest agreements  
Fluctuations in dividends received  
Measures:  
+|- Foreign exchange risk  
Ongoing monitoring  
Primarily from the transaction and translation risks of  
Representation on boards of the subsidiaries  
the Czech Group companies  
Measures:  
+|- Changes in the discount rate for provisions  
Ongoing monitoring  
The present value of provisions decreases at a higher  
Currency hedging, where necessary  
discount rate and increases at a lower discount rate  
Measures:  
+|- Prices changes in financial assets (securities,  
Ongoing monitoring  
funds)  
resulting from fluctuations in market value on the  
capital markets  
- Counterparty risks  
Measures:  
Complete or partial failure of counterparties  
Conservative Investment Policy  
Measures:  
Consistent monitoring  
Ongoing monitoring  
On-going quantification of share price risks  
Credit limit systems  
Hedging instruments  
Targeted strategy of diversification of business  
+|- Rating change  
partners  
means lower| higher refinancing costs  
COVID-19 counterparty task force  
Measures:  
The management of Energie AG continues to  
- Liquidity risk  
seek to maintain Energie AG’s Single A credit  
Measures:  
rating in the long term  
Ensuring compliance with the required key  
Centralised, forward-looking liquidity planning  
financial performance indicators  
Sufficient liquidity reserves  
Open, partially committed credit lines  
Risk management process  
Due to the current developments in the energy industry and energy policy environment and  
the associated volatile situation on the energy markets, the industry as a whole and  
Energie AG as an industry player are facing numerous uncertainties. The aim of the risk  
management process is to identify these risks and opportunities at an early stage, to evaluate  
them and to derive suitable measures from them in order to minimise the risks and take  
advantage of opportunities in the best way possible. As an integral part of the management  
and control system, risk assessments support the management team and form part of the  
strategic and operational issues decision-making process.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
316  
Company Annual Report 2021/2022 Company Management Report  
The established COSO II framework forms the basis for the Group-wide risk management  
process at Energie AG. The responsible business units follow a structured quarterly process to  
identify and evaluate risks, opportunities and measures and record them in a central software  
tool. The data collected is then analysed on Group-level and incorporated into the Group’s  
overall risk position.  
Reporting to the Group’s Management Board is done on a quarterly basis and ad hoc as  
required. The risk management report is an integral part of reporting to the Supervisory Board  
and is, in accordance with the requirements of the Austrian Company Law Amendment Act  
(URÄG), also submitted to the audit committee with respect to the efficiency and validity of  
the processes. The central management system assures proper documentation and  
verifiability.  
RESEARCH, DEVELOPMENT AND INNOVATION  
The topics of research, development and innovation are significant elements in bolstering  
Energie AG for future challenges. Numerous projects were successfully completed in the  
fiscal year 2021/2022.  
The climate targets at a European and Austrian level are increasingly being concretised with  
derivations and regulations, giving rise to new topics and fields of research. The hydrogen  
technology activities launched in the past fiscal years are seeing continual further  
development. Hydrogen will be of great importance in the future to support the shift of  
renewable electricity production from summer to winter and decarbonisation in industry.  
Energie AG is aware of the importance of a supply security for its customers, and its social  
responsibility for future generations. For this reason, projects to bolster the resilience of the  
energy system and provide efficient customer services are being driven forward proactively  
and with a high level of commitment in all areas of the Group. Digitalisation and automation  
play a central role here. Good networking, and intensive cooperation with partners from  
science and industry on research, development and innovation, are the building blocks for a  
successful exchange with valuable mutual benefits.  
Since 1 October 2019, “innovation”, an important issue for the future, has been actively  
promoted by Wertstatt 8 GmbH. This wholly owned subsidiary focuses its activities on the  
development of digital solutions and innovative business models relating to energy and the  
environment. In the fiscal year 2021/2022, the focus in this sector was primarily on  
developing new business ideas. To allow this to happen, platform economy and business  
ecosystem expertise was established, among other things, and intensive customer research  
was stepped up. To test these business ideas, several digital prototypes and deliberately small-  
scale field tests were implemented to gain initial experience in the market.  
R&D&I key performance indicators  
Unit  
2021/2022  
2020/2021  
Change  
Number of R&D&I projects in the Group  
Number  
103  
128  
-19.5%  
Staff in R&D&I projects  
FTE  
56.3  
58.9  
-4.4%  
R&D&I expenses in the Group  
EUR mill.  
5.3  
5.5  
-3.6%  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
317  
Company Annual Report 2021/2022 Company Management Report  
In fiscal year 2021/2022, research, development and innovation were pursued in the  
following projects (non-exhaustive list):  
Carbon Cycle Economy Demonstration (CCED)  
The “Carbon Cycle Economy Demonstration” project focuses on the sustainable  
implementation of a circular economy for CO2. This involves investigating a number of  
different options for a further use of carbon dioxide taken from the atmosphere or  
manufacturing processes for energy purposes with the help of hydrogen. In this way, it may  
be possible to decisively reduce emissions of climate-damaging gases. Energie AG is involved  
with field trials at its biogas plant in Engerwitzdorf. This project is expected to further boost  
the efficiency and environmental friendliness of the plant.  
Industry4Redispatch  
Volatility in the electricity grid caused by further expansion of renewable energies, and  
dynamic energy prices to match, are leading to growing demands on the electricity grid  
infrastructure in transmission and distribution grids. The “Industry4Redispatch” research  
project, which was launched in the 2020/2021 fiscal year, focuses on leveraging the potential  
of load flexibility in large and medium-sized industrial operations. The aim is to use the  
identified flexibility to replace the use of power plants for redispatching (= interventions in  
generation output to avoid power grid overloads) on the Austrian electricity transmission  
grid. In the current project phase, Netz OÖ GmbH is collaborating with several distribution  
system operators, the Austrian transmission system operator and other partners from the  
fields of research and automation technology to develop a suitable procedure that will enable  
offers from the electricity distribution system, including analysis of the corresponding required  
grid capacity.  
SSCCS – Secure Supply Chains for Critical Systems  
The aim of the “Secure Supply Chains for Critical Systems” (SSCCS) project is to improve the  
resilience and reliability of delivery chains against cyber attacks. Based on appropriate analysis  
and documentation of the supply chains, supply chains are investigated for vulnerabilities  
relating to cyber security and corresponding measures are developed to improve resilience.  
One key feature of the project is the shift away from a purely technical perspective towards  
the integration of various attack vectors and vulnerabilities along the supply chain.  
Furthermore, an exchange of experience and know-how transfer between the project  
partners in various industries is planned.  
Predictive maintenance  
Establishing a predictive maintenance strategy at hydropower plants is one project from  
Energie AG’s digitalisation and automation initiative. Energie AG Oberösterreich  
Erzeugung GmbH is striving to develop a strategy for data-based decision support in  
operations management and maintenance. Development work on a dashboard for a pilot  
power plant began in the reporting period with a view to conducting and evaluating field  
trials.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
318  
Company Annual Report 2021/2022 Company Management Report  
OUTLOOK  
With a view to economic development in the fiscal year 2022/2023, forecasts by economic  
research institutes are pessimistic across the board due to the sharp rise in prices and limited  
consumer purchasing power. In any case, the IHS, WIFO and IMF expect the economy to drop  
very sharply in 2023, forecasting GDP growth for Austria in the range of +0.2% to +1.0%  
with inflation between +5.1% and +6.8%. In the euro zone, economic growth of +0.3% to  
+2.3% is expected for 2023.  
Shortly after the end of the reporting period, the National Emission Allowance Trading Act  
(NEHG) 2022 implementing the eco-social tax reform came into force on 1 October 2022 and  
the Market Premium Regulation on 4 October 2022. The changes in the tax system resulting  
from CO2 pricing and the new legal regulations announced for energy efficiency, heating and  
climate protection will define new general conditions for all sectors of the energy industry;  
this will naturally have an impact across all consumption segments – from households to  
industry – and will be a factor shaping further sales activities.  
On 18 November 2022, the Austrian federal government announced the key points related  
to the national implementation of the EU Emergency Measures Regulation on the absorption  
and redistribution of surplus proceeds. In future, a revenue cap of EUR 140.0/MWh will apply  
for electricity producers, which can increase in case direct additional costs are proven. There  
will also be an input credit for investments into renewable energies and energy efficiency.  
These regulations come into effect on 1 December 2022 in Austria and will apply until  
31 December 2023. An initiative for the new Energy Crisis Levy Act was already submitted to  
the National Council and a resolution is expected in December.  
The general conditions in the energy industry remain challenging for Energie AG, and for the  
entire industry. The future development of prices on the international energy markets is  
difficult to assess for the 2022/2023 fiscal year due to the many unpredictable factors  
influencing these. Key factors will include the further course of the Russian-Ukrainian war,  
political or regulatory intervention in the market, including possible energy-steering measures  
by the Austrian government, economic developments, and weather conditions, particularly in  
the coming winter.  
Against the backdrop of the rising and volatile energy prices and the related procurement  
risk, tightly meshed integration of procurement and sales processes will continue to play a  
central role in the coming months. The price guarantee in the residential and commercial  
customer segment will end at the beginning of the 2023 calendar year; prompted by higher  
procurement costs, a price increase will be necessary for the electricity and gas supply to  
existing customers. The support measures planned or adopted by government – such as the  
electricity price cap – are intended to ease the burden on customers.  
In the generation sector, work on the Ebensee pumped-storage power plant project will push  
forward intensively in order to bring about a building decision in the 2022/2023 fiscal year.  
The construction of additional flexible storage capacities is a basic prerequisite for achieving  
the ambitious national expansion targets for electricity generation from renewable energies  
while at the same time ensuring security of supply.  
The focus for the Grid Segment in the fiscal year 2022/2023 will be on the in-depth  
regulatory review of costs and structures in the Grid Segment and the establishment of the  
electricity distribution grid operator benchmark based on this. In terms of tariffs, higher  
electricity grid utilisation fees can be expected due to the fraught situation on the energy  
market, as high energy prices will also have an impact on the procurement prices for grid  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
319  
Company Annual Report 2021/2022 Company Management Report  
losses. In addition to this, the implementation of the EAEC package will play a central role.  
Expansion of photovoltaic systems is expected to remain at a similarly high level in the coming  
years; the challenges will then shift to expanding the existing grid infrastructures. In addition,  
further relevant changes in the statutory environment are expected for the Grid Segment in  
the course of the 2022/2023 fiscal year, for example, due to the Electricity Market Act for the  
electricity sector, and due to the Renewable Heat Act for the gas sector.  
In the Waste Management Segment, the very good economic environment prevalent in the  
2021/2022 fiscal year is unlikely to continue at the same level. A noticeable turnaround has  
already begun and the market situation is expected to be challenging in the  
2022/2023 fiscal year. In the paper/cardboard sector in particular, the paper industry is  
expected to purchase significantly lower volumes due to production cutbacks. The market for  
waste wood is currently tight due to high demand and limited availability. In addition, further  
cost increases can be expected due to high inflation.  
High energy costs will continue to be a major challenge in the Czech Republic Segment,  
particularly in the first quarter of the new fiscal year 2022/2023. The Czech government has  
decided to cap prices for electricity and gas as of 1 January 2023; this is expected to prompt a  
positive development in results from the heating and water sectors. Close monitoring of the  
current developments on the electricity and gas market, which are dramatic in terms of costs,  
is continuing, especially since these drastic price increases are exposing suppliers, operators  
and customers under serious pressure. One focus in the coming fiscal year will be on the  
ongoing development of energy efficiency projects for the heat and water supply and  
wastewater management. A merger is planned, at the beginning of the  
2022/2023 fiscal year, between VAK Zápy s.r.o. and its owning company VAK Beroun a.s.,  
which will in future manage the water and wastewater activities in the central region around  
Prague. The services provided to municipalities and cities are forecasted to remain stable in  
the 2022/2023 fiscal year, although – here too – there are signs of greater reticence in terms  
of communal investment.  
In the telecommunications business area, the focus in the next fiscal year will be on  
wholesale, i.e., the marketing of bandwidths to internet service providers. In this area, work is  
underway to optimise the product range and take a more active approach to customer  
support and acquisition. In addition, the interfaces and processes with the recently created  
BBOÖ GmbH are being continuously improved in order to push forward with the fibre-optic  
roll-out for Upper Austria in the best possible way. In the area of intra-Group services – in  
particular operational technology – the aim is to continue to develop existing services with a  
view to the needs of users, and create attractive offerings for the Group’s partners by doing  
so.  
In its function as an energy supplier majority-owned by the Province of Upper Austria,  
Energie AG will continue to make every effort in the 2022/2023 fiscal year to reliably perform  
its system-critical tasks, in particular supplying its customers, in a fragile economic and  
geopolitical situation. The permanent orientation of all services to customer needs, the  
focuses of digitalisation and innovation, and the financial stability of the Group will remain  
important strategic objectives in the future.  
At the same time, the focus is more than ever on making a significant contribution to the  
energy transition by expanding renewable energies, establishing a comprehensive circular  
economy system and pushing forward with the transformation in mobility. The stable  
financial situation achieved in recent years through forward-looking measures and the  
Group’s diversified business portfolio provide the basis for mastering these challenging  
developments.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
320  
Company Annual Report 2021/2022 Company Management Report  
Against the backdrop of the significant number of uncertainties and highly volatile price  
developments, EBIT for the 2022/2023 fiscal year is expected to come in at least at the level  
of the 2021/2022 fiscal year – subject to further potential interventions in the market by  
policymakers or regulators.  
Linz, 5 December 2022  
The Management Board of Energie AG Oberösterreich  
Chief Executive Officer  
DDr. Werner Steinecker MBA  
Dr. Andreas Kolar  
Dipl.-Ing. Stefan Stallinger MBA  
Chairman of the Management Board  
Member of the Management Board  
Member of the Management Board  
CEO  
CFO  
COO  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
321  
Company Annual Report 2021/2022 Audit Certificate  
AUDIT CERTIFICATE  
REPORT ON THE ANNUAL FINANCIAL STATEMENTS  
Audit opinion  
We have audited the Annual Financial Statements of Energie AG Oberösterreich, Linz,  
comprising the Statement of Financial Position as of 30 September 2022, the Statement of  
Income for the fiscal year ending as of that date, as well as the Notes to the Annual Financial  
Statements.  
It is our opinion that the attached Annual Financial Statements comply with the statutory  
requirements and present an in all material respects suitable view of the asset and financial  
position of the Company as of 30 September 2022, as well as the earnings position and cash  
flows of the Company during the fiscal year ending on that date, in accordance with Austrian  
corporate law and the statutory provisions of the Electricity Industry and Organisation Act  
2010 and the Gas Industry Act 2011.  
Basis for our audit opinion  
We have conducted our audit in accordance with Directive (EU) No. 537/2014 (EU Directive  
hereinafter) and the Austrian Principles of Proper Auditing of Financial Statements. These  
principles require the application of the International Standards on Auditing (ISA). Our  
responsibilities under these regulations and standards are set out in more detail in section  
“Responsibilities of the Auditor in Auditing the Annual Financial Statements” of the audit  
certificate. We are independent from the Company in compliance with the Austrian corporate  
law and professional regulation and have discharged our other professional duties in  
accordance with these requirements. We are of the opinion that the audit evidence obtained  
by us by the date of our audit certificate is sufficient and suitable for forming the basis for our  
audit opinion expressed as of that date.  
Highly significant audit findings  
Highly significant audit findings are findings concerning circumstances that, in our  
professional judgement, had the highest significance for our audit of the Annual Financial  
Statements for the fiscal year. These findings were considered in the context of our audit of  
the Annual Financial Statements in their entirety, as well as in forming our audit opinion. We  
do not issue a separate opinion on these findings.  
1. Measurement of shares in affiliated companies  
Circumstances and problem  
As of the reporting date, shares in affiliated companies with a carrying amount of  
EUR 718.1 million represent approx. 20.2% of the total assets. An amount of approximately  
EUR 19 thousand in expenses from loss absorption agreements was recognised in the year  
under review. No impairment was recognised for shares in affiliated companies.  
When preparing the Annual Financial Statements, Energie AG Oberösterreich analyses all  
material shares in affiliated companies on the presence of indications for a material change in  
value. For shares in affiliated companies that were impaired in previous years, it is examined  
whether the reasons for an impairment no longer apply and an upward revaluation is  
required. Where such indications are present, the value of the affiliated company is measured  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
322  
Company Annual Report 2021/2022 Audit Certificate  
and any resulting difference in value recognised as an impairment/write-up to the carrying  
amount.  
Measuring the company’s value requires a number of discretionary decisions and is subject to  
significant components derived by estimation, e.g. selection of the method for measuring the  
company’s value, estimation of future cash flows, and determination of a reasonable  
discounting rate. There is a risk that inadequate estimates and/or discretionary decisions have  
a significant impact on the resultant company value and in turn on the carrying amounts  
recognised for the shares in affiliated companies in the Statement of Financial Position and  
the financial result reported in the Statement of Income.  
Details on the measurement of shares in affiliated companies can be found in the Notes,  
section “II. Accounting policies”, subsection “Non-current assets”.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
323  
Company Annual Report 2021/2022 Audit Certificate  
Audit methodology  
We have carried out our audit of the measurement of shares in affiliated companies as  
follows:  
We have analysed and critically examined the process for measuring shares in affiliated  
companies on the basis of the documentation available at the company and information  
received with respect to whether the process is suitable to assure a reasonable  
measurement of the shares in affiliated companies.  
We have identified the internal controls for this process we deemed relevant to the  
outcome of our audit and assessed how they have been developed and set up.  
We have critically examined the Company’s analyses of indications for a necessary  
material impairment or impairment reversal, and assessed them in consideration of the  
insights gained from our audit of the Annual Financial Statements.  
Where such indicators were present, we examined the Company’s own valuation with a  
particular focus on discretionary decisions and estimations as follows:  
We have reviewed the selection of the valuation model, the planning assumptions,  
and the valuation parameters.  
Our valuation specialists have assessed the assumptions made in connection with  
the discounting rate on their adequacy by verifying them against market- and  
industry-specific reference values.  
We have assessed the formal and substantial plausibility of the internal planning  
calculations that form the foundation for the assumptions made in relation to  
expected cash flows.  
The results of the company valuation was juxtaposed against the carrying amounts  
for the concerned shares in affiliated companies and we assessed any potential  
need for the recognition of an impairment or impairment reversal.  
Other Disclosures  
The legal representatives are responsible for the other required disclosures. The other  
disclosures encompass all information presented in the Annual Financial Report, with the  
exception of the Consolidated Financial Statements, the Management Report and Group  
Management Report, and the associated audit certificates. The Non-financial Report was  
received by us prior to the date of this audit certificate, the other components of the Annual  
Financial Report are expected to be made available to us after that date.  
Our audit opinion on the Annual Financial Statements does not extend to these other  
disclosures, which are excluded from the assurances given by our firm. We refer to the  
section contained in the “Report on the Management Report” with regard to the information  
contained in the Management Report.  
Our audit of the Annual Financial Statements comes with the responsibility to read and  
consider the other disclosures with the objective of determining whether they contain  
significant discrepancies from the Annual Financial Statements and the insights gained during  
our audit, or whether they are significantly misrepresented in another way.  
We are compelled to report if the work carried out in relation to the other disclosures  
received before the date of the audit certificates leads us to the conclusion that these other  
disclosures are significantly misrepresented. Our audit has not resulted in any reportable  
circumstances.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
324  
Company Annual Report 2021/2022 Audit Certificate  
Responsibilities of the legal representatives and the Audit Committee  
for the Annual Financial Statements  
The legal representatives are responsible for compiling the Annual Financial Statements in  
compliance with Austrian corporate law, the statutory provisions of the Electricity Industry  
and Organisation Act 2010 and the Gas Industry Act 2011, and for assuring that they provide  
a true and fair view of the Company’s assets, liabilities, financial position and profit or loss.  
The legal representatives are further responsible for the internal controls deemed necessary by  
them for preparing a set of Annual Financial Statements that is free from significant  
misrepresentations caused by fraud or human error.  
In compiling the Annual Financial Statements, the legal representatives have the duty to form  
an opinion on the Company’s ability to continue its business operations, to disclose any  
relevant circumstances relating to the continuation of the business operations and to base  
their considerations on the principle of continued business operations, unless they intend to  
liquidate the Company, cease business operations or find themselves in lack of any viable  
alternative to such course of action.  
The Audit Committee is responsible for supervising the Company’s accounting processes.  
Responsibilities of the auditors for the audit of the Annual Financial  
Statements  
Our objective is to assure an adequate degree of certainty on whether the Annual Financial  
Statements in their entirety are free from significant misrepresentations caused by fraud or  
human error, and to issue an audit certificate that reflects our audit findings. An adequate  
degree of certainty means a high degree of certainty, but is not an absolute guarantee that  
the audit conducted in accordance with the EU Directive and the Austrian Principles of Proper  
Auditing, which require application of ISA, has in fact identified all significant  
misrepresentations that may be contained in the audited financial statements.  
Misrepresentations may result from malicious acts or misconceptions and are deemed  
significant if they could, individually or collectively, have a potential influence on the  
commercial decisions made by their readers on the basis of these Annual Financial  
Statements.  
In conducting our audit in accordance with the EU Directive and the Austrian Principles of  
Proper Auditing, which require application of ISA, we form our opinions on the basis of our  
professional judgement and maintain a critical view of the circumstances presented to us  
throughout the entire course of the audit.  
We further adhere to the following:  
We identify and assess the risks stemming from any significant misrepresentations in the  
Financial Statements caused by fraud or human error, plan our audit activities as a  
response to these risks, perform our audit activities and gain sufficient and suitable audit  
evidence to serve as the basis for our audit findings. The risk of significant  
misrepresentations resulting from malicious acts remaining undetected is higher than the  
risk resulting from misconceptions, because malicious acts may include collusion,  
fraudulent acts, forgery, intentional omissions, deceiving representations or the  
circumvention of internal controls.  
In order to plan audit activities that adequately address the prevailing circumstances, we  
gain an understanding of the system of internal controls bearing relevance for our audit,  
but without the objective of forming an audit opinion on its effectiveness.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
325  
Company Annual Report 2021/2022 Audit Certificate  
We evaluate the appropriateness of the accounting methods applied by the legal  
representatives, as well as the tenability of values estimated by the legal representatives  
and represented in the accounts and the disclosures associated with such estimates.  
We draw inferences about the appropriateness of the legal representatives operating  
under the accounting principle of continued business operations, as well as, on the basis  
of the evidence presented to us for our audit, whether any events or circumstances are  
subject to a considerable uncertainty that would give rise to doubts about the viability of  
the Company continuing its business operations. If we arrive at the conclusion that a  
material uncertainty exists, we are obliged to draw attention to the associated  
disclosures contained in the Annual Financial Statements in our audit certificate, or to  
modify our audit certificate if these disclosures are inappropriate. We draw our  
conclusions on the basis of the audit evidence gathered by the date of our audit  
certificate. Future events or circumstances may however result in the Company resolving  
to discontinue its business operations.  
We form an opinion on the overall presentation, structure and contents of the Annual  
Financial Statements including the disclosures therein, as well as on whether they  
present a suitable view of the underlying business transactions and events.  
We consult with the Audit Committee on matters such as the planned scope and timing of  
the audit as well as significant audit findings, including any significant defects in the system  
of internal control system detected during our audit.  
We also issue a statement to the Audit Committee confirming our adherence to the relevant  
professional requirements pertaining to our independence, and exchange information with  
the Audit Committee on all relationships and other circumstances that may reasonably be  
expected to affect our independence and, if applicable, any associated precautionary  
measures.  
From the circumstances discussed with the Audit Committee, we determine those that have  
the highest significance for the audit of the Annual Financial Statements for the fiscal year  
and that therefore represent the circumstances bearing special significance for the audit. We  
describe these circumstances in our audit certificate, unless public disclosure of a certain  
circumstance is prohibited by law or other legal requirement, or determine in very rare cases  
that certain circumstances should not be disclosed in our audit certificate because the  
negative implications of disclosing them could reasonably be expected to exceed the benefits  
for the public interest.  
Audit report on the Management Report  
Austrian corporate law requires an assessment of whether the Management Report reconciles  
with the Annual Financial Statements and whether it was compiled in accordance with the  
applicable legal requirements.  
The legal representatives are responsible for compiling the Company Management Report in  
compliance with the requirements under Austrian corporate law.  
We have conducted our audit on the basis of the professional principles for the auditing of  
management reports.  
Audit opinion  
We have formed the opinion that the attached Management Report complies with the  
applicable legal requirements and that it reconciles with the Annual Financial Statements.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
326  
Company Annual Report 2021/2022 Audit Certificate  
Declaration  
Our audit of the Annual Financial Statements and the understanding formed about the  
Company and its business environment has not identified any material misrepresentations in  
the Management Report.  
Additional information pursuant to Article 10 EU Directive  
Our firm was elected auditors of the financial statements for the fiscal year ending on  
30 September 2022 by the General Meeting held on 17 December 2021. On 9 February  
2022, the Supervisory Board has granted our firm the mandate to audit the Company’s  
Financial Statements for the fiscal year ending on 30 September 2022. We have been the  
Company’s auditors without interruption since the fiscal year ending 30 September 2021.  
We hereby declare that our audit opinion presented in section “Report on the Annual  
Financial Statements” reconciles with the additional report to the Audit Committee pursuant  
to Article 11 of the EU Directive.  
We hereby declare that we have not performed any prohibited non-audit services pursuant to  
Article 5 para 1 EU Directive and that we have maintained our independence from the  
audited company during the conduct of our audit of the Financial Statements.  
Responsible auditor  
The responsible auditor for this assignment was Mag. Gerhard Marterbauer.  
Vienna  
5 December 2022  
Deloitte Audit Wirtschaftsprüfungs GmbH  
Mag. Gerhard Marterbauer  
Auditor  
The Annual Financial Statements bearing our audit certificate may only be published or disclosed in the version certified  
by us. This audit certificate refers exclusively to the full original Annual Financial Statements and the Management  
Report issued in German. The provisions of § 281 para 2 of the Austrian Commercial Code (UGB) must be observed for  
any other versions.  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
Loading SVG
327  
Company Annual Report 2021/2022 Statement by the Management Board  
STATEMENT BY THE MANAGEMENT BOARD  
PURSUANT TO § 124 PARA 1 SUBPARA 3 OF THE  
STOCK EXCHANGE ACT [BÖRSEGESETZ (BÖRSEG)]  
The Management Board of Energie AG Oberösterreich confirms to the best of its knowledge  
that the Annual Financial Statements of Energie AG Oberösterreich give a true and fair view  
of the assets, liabilities, as well as the financial and earnings position of the Company as  
required by the applicable accounting standards, and that the Management Report represents  
the development and performance of the business and the position of the Company in such  
a way, that it gives a true and fair view of the assets, liabilities, as well as the financial and  
earnings position of the Company, together with a description of the principal risks and  
uncertainties faced by the Company.  
Linz, 5 December 2022  
The Management Board of Energie AG Oberösterreich  
Chief Executive Officer  
DDr. Werner Steinecker MBA  
Dr. Andreas Kolar  
Dipl.-Ing. Stefan Stallinger MBA  
Chairman of the Management Board  
Member of the Management Board  
Member of the Management Board  
CEO  
CFO  
COO  
Energie AG Oberösterreich – Annual Financial Report 2021/2022  
DISCLAIMER  
Any gender-specific terms used in this report should be understood as referring to both  
genders, unless explicitly stated.  
When “Energie AG” is referred to in the financial statement, Energie AG Oberösterreich is  
meant.  
This report contains forward-looking statements subject to risks and uncertainties that could  
cause actual results to differ substantially from those predicted. Terms used such as “presu-  
med”, “assumed”, “estimated”, “expected”, “intended”, “may”, “planned”, “projected”,  
“should” and comparable expressions serve to characterise forward-looking statements. No  
guarantees can therefore be given that the forecasts and planned values will actually  
materialise regarding economic, currency-related, technical, competition-related and several  
other important factors that could cause actual results to differ from those anticipated in the  
forward-looking statements. Energie AG does not intend to update such forward-looking  
statements and refuses any responsibility for any such updates. We have exercised utmost  
diligence in the preparation of this report and checked the data contained therein. The  
present English version is a translation of the German report. The German version of the  
report is the only authentic version.  
LEGAL NOTICE  
Responsible publisher:  
Energie AG Oberösterreich, Böhmerwaldstraße 3, 4020 Linz, Austria  
Editors:  
Michael Frostel MSc, Mag. Margit Lang, Mag. Iveta Strnadova MBA, Mag. Gerald Seyr,  
Mag. Klaus Oberparleiter  
Concept, graphic design and implementation: nexxar GmbH, Wien  
Cover design: upart Werbung & Kommunikation GmbH, Linz  
Translation: GORNIK translators for industry GmbH  
Photo Credits: Energie AG Oberösterreich, Wolfgang Zopf, Hermann Wakolbinger  
Subject to errors and misprints.  
Linz, December 2022  
Loading SVG
Energie AG Oberösterreich  
Böhmerwaldstraße 3  
4020 Linz, Austria  
www.energieag.at