{
 "documentInfo": {
  "documentType": "https://xbrl.org/2021/xbrl-json",
  "features": {
   "xbrl:canonicalValues": true
  },
  "namespaces": {
   "ifrs-full": "http://xbrl.ifrs.org/taxonomy/2021-03-24/ifrs-full",
   "iso4217": "http://www.xbrl.org/2003/iso4217",
   "scheme": "http://standards.iso.org/iso/17442",
   "woodsideenergygroupltd": "http://woodsideenergygroupltd.com/xbrl/2022",
   "xbrl": "https://xbrl.org/2021",
   "xbrli": "http://www.xbrl.org/2003/instance"
  },
  "taxonomy": [
   "http://woodsideenergygroupltd.com/xbrl/2022/2549005zc5rxaoo7fh41-2022-12-31.xsd"
  ]
 },
 "facts": {
  "fact-1": {
   "value": "Principal activities The principal activities and operations of Woodside during the \ufb01nancial year were hydrocarbon exploration, evaluation, development, production and marketing. Other than as previously referred to in the operating and \ufb01nancial review section, including the merger with BHP\u2019s petroleum business, there were no other signi\ufb01cant changes in the nature of the activities of the consolidated entity during the year.",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfNatureOfEntitysOperationsAndPrincipalActivities",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-6": {
   "value": "16817000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Revenue",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-7": {
   "value": "6962000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Revenue",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-8": {
   "value": "3600000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Revenue",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-9": {
   "value": "6540000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CostOfSales",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-10": {
   "value": "3845000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CostOfSales",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-11": {
   "value": "2985000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CostOfSales",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-12": {
   "value": "10277000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:GrossProfit",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-13": {
   "value": "3117000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:GrossProfit",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-14": {
   "value": "615000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:GrossProfit",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-15": {
   "value": "735000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-16": {
   "value": "139000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-17": {
   "value": "-36000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-18": {
   "value": "2726000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherExpenseByFunction",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-19": {
   "value": "811000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherExpenseByFunction",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-20": {
   "value": "481000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherExpenseByFunction",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-21": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-22": {
   "value": "10000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-23": {
   "value": "5269000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-24": {
   "value": "900000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ReversalOfImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-25": {
   "value": "1058000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ReversalOfImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-26": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ReversalOfImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-27": {
   "value": "9186000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-28": {
   "value": "3493000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-29": {
   "value": "-5171000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossFromOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-30": {
   "value": "155000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-31": {
   "value": "27000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-32": {
   "value": "58000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-33": {
   "value": "167000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceCosts",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-34": {
   "value": "230000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceCosts",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-35": {
   "value": "327000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceCosts",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-36": {
   "value": "9174000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossBeforeTax",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-37": {
   "value": "3290000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossBeforeTax",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-38": {
   "value": "-5440000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossBeforeTax",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-39": {
   "value": "-313000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:PetroleumResourceRentTaxExpenseBenefit",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-40": {
   "value": "297000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:PetroleumResourceRentTaxExpenseBenefit",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-41": {
   "value": "-439000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:PetroleumResourceRentTaxExpenseBenefit",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-42": {
   "value": "2912000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxExpenseContinuingOperations",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-43": {
   "value": "957000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxExpenseContinuingOperations",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-44": {
   "value": "-1026000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxExpenseContinuingOperations",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-45": {
   "value": "6575000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-46": {
   "value": "2036000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-47": {
   "value": "-3975000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-48": {
   "value": "6498000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToOwnersOfParent",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-49": {
   "value": "1983000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToOwnersOfParent",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-50": {
   "value": "-4028000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToOwnersOfParent",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-51": {
   "value": "77000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToNoncontrollingInterests",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-52": {
   "value": "53000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToNoncontrollingInterests",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-53": {
   "value": "53000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLossAttributableToNoncontrollingInterests",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-54": {
   "value": "6575000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-55": {
   "value": "2036000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-56": {
   "value": "-3975000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-57": {
   "value": "4.30",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:BasicEarningsLossPerShare",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-58": {
   "value": "2.06",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:BasicEarningsLossPerShare",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-59": {
   "value": "-4.235",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:BasicEarningsLossPerShare",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-60": {
   "value": "4.263",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:DilutedEarningsLossPerShare",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-61": {
   "value": "2.041",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:DilutedEarningsLossPerShare",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-62": {
   "value": "-4.235",
   "decimals": 3,
   "dimensions": {
    "concept": "ifrs-full:DilutedEarningsLossPerShare",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD/xbrli:shares"
   }
  },
  "fact-63": {
   "value": "6575000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-64": {
   "value": "2036000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-65": {
   "value": "-3975000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-66": {
   "value": "-1097000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:GainsLossesOnCashFlowHedgesBeforeTax",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-67": {
   "value": "-390000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:GainsLossesOnCashFlowHedgesBeforeTax",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-68": {
   "value": "-136000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:GainsLossesOnCashFlowHedgesBeforeTax",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-69": {
   "value": "-847000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ReclassificationAdjustmentsOnCashFlowHedgesBeforeTax",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-70": {
   "value": "-66000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ReclassificationAdjustmentsOnCashFlowHedgesBeforeTax",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-71": {
   "value": "-52000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ReclassificationAdjustmentsOnCashFlowHedgesBeforeTax",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-72": {
   "value": "-64000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxRelatingToComponentsOfOtherComprehensiveIncomeThatWillBeReclassifiedToProfitOrLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-73": {
   "value": "5000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxRelatingToComponentsOfOtherComprehensiveIncomeThatWillBeReclassifiedToProfitOrLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-74": {
   "value": "-25000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxRelatingToComponentsOfOtherComprehensiveIncomeThatWillBeReclassifiedToProfitOrLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-75": {
   "value": "3000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslation",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-76": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslation",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-77": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxExchangeDifferencesOnTranslation",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-78": {
   "value": "34000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-79": {
   "value": "13000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-80": {
   "value": "2000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncomeNetOfTaxGainsLossesOnRemeasurementsOfDefinedBenefitPlans",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-81": {
   "value": "2000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:NetGainOnnancialInstrumentsAtFairValueThroughOtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-82": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:NetGainOnnancialInstrumentsAtFairValueThroughOtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-83": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:NetGainOnnancialInstrumentsAtFairValueThroughOtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-84": {
   "value": "-147000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-85": {
   "value": "-316000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-86": {
   "value": "-57000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-87": {
   "value": "6428000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-88": {
   "value": "1720000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-89": {
   "value": "-4032000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-90": {
   "value": "6351000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToOwnersOfParent",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-91": {
   "value": "1667000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToOwnersOfParent",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-92": {
   "value": "-4085000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToOwnersOfParent",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-93": {
   "value": "77000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToNoncontrollingInterests",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-94": {
   "value": "53000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToNoncontrollingInterests",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-95": {
   "value": "53000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncomeAttributableToNoncontrollingInterests",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-96": {
   "value": "6428000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-97": {
   "value": "1720000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-98": {
   "value": "-4032000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-99": {
   "value": "6201000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-100": {
   "value": "3025000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-101": {
   "value": "1578000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherCurrentReceivables",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-102": {
   "value": "368000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherCurrentReceivables",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-103": {
   "value": "678000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Inventories",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-104": {
   "value": "202000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Inventories",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-105": {
   "value": "677000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentFinancialAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-106": {
   "value": "320000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentFinancialAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-107": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentAssetsOrDisposalGroupsClassifiedAsHeldForSale",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-108": {
   "value": "254000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentAssetsOrDisposalGroupsClassifiedAsHeldForSale",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-109": {
   "value": "73000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-110": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-111": {
   "value": "83000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-112": {
   "value": "109000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-113": {
   "value": "9290000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-114": {
   "value": "4278000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-115": {
   "value": "845000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentReceivables",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-116": {
   "value": "686000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentReceivables",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-117": {
   "value": "11000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentInventories",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-118": {
   "value": "19000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentInventories",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-119": {
   "value": "120000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentFinancialAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-120": {
   "value": "107000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentFinancialAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-121": {
   "value": "807000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IntangibleExplorationAndEvaluationAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-122": {
   "value": "614000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IntangibleExplorationAndEvaluationAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-123": {
   "value": "39919000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OilAndGasAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-124": {
   "value": "18649000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OilAndGasAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-125": {
   "value": "1959000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-126": {
   "value": "1007000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-127": {
   "value": "1264000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:LeaseAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-128": {
   "value": "1080000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:LeaseAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-129": {
   "value": "265000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:InvestmentAccountedForUsingEquityMethod",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-130": {
   "value": "2000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:InvestmentAccountedForUsingEquityMethod",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-131": {
   "value": "4614000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Goodwill",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-132": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Goodwill",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-133": {
   "value": "227000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-134": {
   "value": "32000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-135": {
   "value": "50031000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-136": {
   "value": "22196000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-137": {
   "value": "59321000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Assets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-138": {
   "value": "26474000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Assets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-139": {
   "value": "2094000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherCurrentPayables",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-140": {
   "value": "639000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:TradeAndOtherCurrentPayables",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-141": {
   "value": "260000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ShorttermBorrowings",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-142": {
   "value": "277000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ShorttermBorrowings",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-143": {
   "value": "654000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentFinancialLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-144": {
   "value": "411000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentFinancialLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-145": {
   "value": "1219000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentProvisions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-146": {
   "value": "605000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentProvisions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-147": {
   "value": "1854000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-148": {
   "value": "413000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-149": {
   "value": "324000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentLeaseLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-150": {
   "value": "191000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentLeaseLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-151": {
   "value": "203000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-152": {
   "value": "86000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCurrentLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-153": {
   "value": "6608000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-154": {
   "value": "2622000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-155": {
   "value": "4878000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:LongtermBorrowings",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-156": {
   "value": "5153000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:LongtermBorrowings",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-157": {
   "value": "2457000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-158": {
   "value": "878000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DeferredTaxLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-159": {
   "value": "67000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentFinancialLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-160": {
   "value": "161000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentFinancialLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-161": {
   "value": "5960000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentProvisions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-162": {
   "value": "2219000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentProvisions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-163": {
   "value": "36000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxLiabilitiesNoncurrent",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-164": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CurrentTaxLiabilitiesNoncurrent",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-165": {
   "value": "1310000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentLeaseLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-166": {
   "value": "1176000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentLeaseLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-167": {
   "value": "878000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-168": {
   "value": "36000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherNoncurrentLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-169": {
   "value": "15586000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-170": {
   "value": "9623000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncurrentLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-171": {
   "value": "22194000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Liabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-172": {
   "value": "12245000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Liabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-173": {
   "value": "37127000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NetAssetsLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-174": {
   "value": "14229000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NetAssetsLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-175": {
   "value": "29001000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssuedCapital",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-176": {
   "value": "9409000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssuedCapital",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-177": {
   "value": "38000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:TreasuryShares",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-178": {
   "value": "30000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:TreasuryShares",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-179": {
   "value": "4031000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherReserves",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-180": {
   "value": "683000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherReserves",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-181": {
   "value": "3342000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:RetainedEarnings",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-182": {
   "value": "3381000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:RetainedEarnings",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-183": {
   "value": "36336000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:EquityAttributableToOwnersOfParent",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-184": {
   "value": "13443000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:EquityAttributableToOwnersOfParent",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-185": {
   "value": "791000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncontrollingInterests",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-186": {
   "value": "786000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:NoncontrollingInterests",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-187": {
   "value": "37127000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-188": {
   "value": "14229000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-189": {
   "value": "6575000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-190": {
   "value": "2036000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-191": {
   "value": "-3975000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-192": {
   "value": "2808000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDepreciationAndAmortisationExpense",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-193": {
   "value": "1582000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDepreciationAndAmortisationExpense",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-194": {
   "value": "1730000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDepreciationAndAmortisationExpense",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-195": {
   "value": "140000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDepreciationExpense",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-196": {
   "value": "108000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDepreciationExpense",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-197": {
   "value": "94000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDepreciationExpense",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-198": {
   "value": "-960000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForGainsLossesOnChangeInFairValueOfDerivatives",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-199": {
   "value": "-31000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForGainsLossesOnChangeInFairValueOfDerivatives",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-200": {
   "value": "-31000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForGainsLossesOnChangeInFairValueOfDerivatives",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-201": {
   "value": "-12000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFinanceIncomeCost",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-202": {
   "value": "-203000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFinanceIncomeCost",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-203": {
   "value": "-269000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForFinanceIncomeCost",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-204": {
   "value": "2599000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncomeTaxExpense",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-205": {
   "value": "1254000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncomeTaxExpense",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-206": {
   "value": "-1465000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncomeTaxExpense",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-207": {
   "value": "164000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForExplorationAndEvaluationWrittenOff",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-208": {
   "value": "265000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForExplorationAndEvaluationWrittenOff",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-209": {
   "value": "2000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForExplorationAndEvaluationWrittenOff",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-210": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-211": {
   "value": "10000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-212": {
   "value": "5269000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-213": {
   "value": "900000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ReversalOfImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-214": {
   "value": "1058000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ReversalOfImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-215": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ReversalOfImpairmentLossRecognisedInProfitOrLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-216": {
   "value": "272000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForRestoration",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-217": {
   "value": "68000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForRestoration",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-218": {
   "value": "28000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForRestoration",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-219": {
   "value": "-494000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForLossesGainsOnDisposalOfNoncurrentAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-220": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForLossesGainsOnDisposalOfNoncurrentAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-221": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForLossesGainsOnDisposalOfNoncurrentAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-222": {
   "value": "245000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForOnerousContractsProvision",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-223": {
   "value": "95000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForOnerousContractsProvision",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-224": {
   "value": "-347000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForOnerousContractsProvision",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-225": {
   "value": "-254000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherAdjustmentsToReconcileProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-226": {
   "value": "30000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherAdjustmentsToReconcileProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-227": {
   "value": "-12000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherAdjustmentsToReconcileProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-228": {
   "value": "-77000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInTradeAndOtherReceivables",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-229": {
   "value": "-39000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInTradeAndOtherReceivables",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-230": {
   "value": "41000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInTradeAndOtherReceivables",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-231": {
   "value": "-146000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInInventories",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-232": {
   "value": "-4000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInInventories",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-233": {
   "value": "51000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForDecreaseIncreaseInInventories",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-234": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForIncreaseInLeaseAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-235": {
   "value": "-16000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForIncreaseInLeaseAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-236": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForIncreaseInLeaseAssets",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-237": {
   "value": "131000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForProvisions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-238": {
   "value": "-75000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForProvisions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-239": {
   "value": "155000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForProvisions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-240": {
   "value": "-31000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForDecreaseIncreaseInLeaseLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-241": {
   "value": "-25000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForDecreaseIncreaseInLeaseLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-242": {
   "value": "40000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForDecreaseIncreaseInLeaseLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-243": {
   "value": "-961000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForIncreaseInOtherAssetsAndLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-244": {
   "value": "-128000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForIncreaseInOtherAssetsAndLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-245": {
   "value": "-137000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:AdjustmentsForIncreaseInOtherAssetsAndLiabilities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-246": {
   "value": "184000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncreaseDecreaseInTradeAndOtherPayables",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-247": {
   "value": "75000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncreaseDecreaseInTradeAndOtherPayables",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-248": {
   "value": "-121000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForIncreaseDecreaseInTradeAndOtherPayables",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-249": {
   "value": "10737000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperations",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-250": {
   "value": "4222000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperations",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-251": {
   "value": "2347000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperations",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-252": {
   "value": "-45000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForSharebasedPayments",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-253": {
   "value": "-47000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForSharebasedPayments",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-254": {
   "value": "-32000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:AdjustmentsForSharebasedPayments",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-255": {
   "value": "108000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:InterestReceivedClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-256": {
   "value": "11000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:InterestReceivedClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-257": {
   "value": "64000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:InterestReceivedClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-258": {
   "value": "19000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsReceivedClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-259": {
   "value": "6000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsReceivedClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-260": {
   "value": "4000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsReceivedClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-261": {
   "value": "21000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceCostsPaidClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-262": {
   "value": "91000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceCostsPaidClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-263": {
   "value": "180000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:FinanceCostsPaidClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-264": {
   "value": "1218000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxesPaidClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-265": {
   "value": "271000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxesPaidClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-266": {
   "value": "331000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncomeTaxesPaidClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-267": {
   "value": "263000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:PaymentsForRestorationClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-268": {
   "value": "38000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:PaymentsForRestorationClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-269": {
   "value": "23000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:PaymentsForRestorationClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-270": {
   "value": "506000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:PaymentsForHedgeCollateralClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-271": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:PaymentsForHedgeCollateralClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-272": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:PaymentsForHedgeCollateralClassifiedAsOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-273": {
   "value": "8811000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-274": {
   "value": "3792000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-275": {
   "value": "1849000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInOperatingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-276": {
   "value": "1082000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:CashReceivedOnAcquisitionOfBHPPIncludingCashAcquiredclassifiedAsInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-277": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:CashReceivedOnAcquisitionOfBHPPIncludingCashAcquiredclassifiedAsInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-278": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:CashReceivedOnAcquisitionOfBHPPIncludingCashAcquiredclassifiedAsInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-279": {
   "value": "3136000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsUsedInExplorationAndDevelopmentActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-280": {
   "value": "2406000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsUsedInExplorationAndDevelopmentActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-281": {
   "value": "1418000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsUsedInExplorationAndDevelopmentActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-282": {
   "value": "287000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:BorrowingCostsRelatingToInvestingActivitiesclassifiedAsInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-283": {
   "value": "126000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:BorrowingCostsRelatingToInvestingActivitiesclassifiedAsInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-284": {
   "value": "57000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:BorrowingCostsRelatingToInvestingActivitiesclassifiedAsInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-285": {
   "value": "48000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAdvancesAndLoansMadeToOtherPartiesClassifiedAsInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-286": {
   "value": "206000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAdvancesAndLoansMadeToOtherPartiesClassifiedAsInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-287": {
   "value": "110000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAdvancesAndLoansMadeToOtherPartiesClassifiedAsInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-288": {
   "value": "132000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromOtherLongtermAssetsClassifiedAsInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-289": {
   "value": "9000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromOtherLongtermAssetsClassifiedAsInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-290": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromOtherLongtermAssetsClassifiedAsInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-291": {
   "value": "8000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfInterestsInInvestmentsAccountedForUsingEquityMethod",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-292": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfInterestsInInvestmentsAccountedForUsingEquityMethod",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-293": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PurchaseOfInterestsInInvestmentsAccountedForUsingEquityMethod",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-294": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCashPaymentsToAcquireInterestsInJointVenturesClassifiedAsInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-295": {
   "value": "212000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCashPaymentsToAcquireInterestsInJointVenturesClassifiedAsInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-296": {
   "value": "527000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherCashPaymentsToAcquireInterestsInJointVenturesClassifiedAsInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-297": {
   "value": "-2265000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-298": {
   "value": "-2941000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-299": {
   "value": "-2112000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInInvestingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-300": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-301": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-302": {
   "value": "600000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-303": {
   "value": "283000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:RepaymentsOfBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-304": {
   "value": "784000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:RepaymentsOfBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-305": {
   "value": "83000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:RepaymentsOfBorrowingsClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-306": {
   "value": "18000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:BorrowingCostsRelatingTonancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-307": {
   "value": "15000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:BorrowingCostsRelatingTonancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-308": {
   "value": "21000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:BorrowingCostsRelatingTonancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-309": {
   "value": "248000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PaymentsOfLeaseLiabilitiesClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-310": {
   "value": "155000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PaymentsOfLeaseLiabilitiesClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-311": {
   "value": "71000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PaymentsOfLeaseLiabilitiesClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-312": {
   "value": "10000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:BorrowingCostsRelatingToLeaseLiabilitiesClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-313": {
   "value": "89000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:BorrowingCostsRelatingToLeaseLiabilitiesClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-314": {
   "value": "86000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:BorrowingCostsRelatingToLeaseLiabilitiesClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-315": {
   "value": "144000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PaymentsToAcquireOrRedeemEntitysShares",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-316": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PaymentsToAcquireOrRedeemEntitysShares",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-317": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:PaymentsToAcquireOrRedeemEntitysShares",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-318": {
   "value": "98000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:ContributionsToNonControllingInterestClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-319": {
   "value": "92000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:ContributionsToNonControllingInterestClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-320": {
   "value": "111000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:ContributionsToNonControllingInterestClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-321": {
   "value": "2558000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaidClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-322": {
   "value": "289000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaidClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-323": {
   "value": "454000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaidClassifiedAsFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-324": {
   "value": "-5000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromIssuingShares",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-325": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromIssuingShares",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-326": {
   "value": "23000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProceedsFromIssuingShares",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-327": {
   "value": "-3364000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-328": {
   "value": "-1424000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-329": {
   "value": "-203000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashFlowsFromUsedInFinancingActivities",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-330": {
   "value": "3182000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInCashAndCashEquivalentsBeforeEffectOfExchangeRateChanges",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-331": {
   "value": "-573000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInCashAndCashEquivalentsBeforeEffectOfExchangeRateChanges",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-332": {
   "value": "-466000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseInCashAndCashEquivalentsBeforeEffectOfExchangeRateChanges",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-333": {
   "value": "3025000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-334": {
   "value": "3604000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-335": {
   "value": "4058000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-336": {
   "value": "-6000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:EffectOfExchangeRateChangesOnCashAndCashEquivalents",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-337": {
   "value": "-6000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:EffectOfExchangeRateChangesOnCashAndCashEquivalents",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-338": {
   "value": "12000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:EffectOfExchangeRateChangesOnCashAndCashEquivalents",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-339": {
   "value": "6201000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-340": {
   "value": "3025000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-341": {
   "value": "3604000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:CashAndCashEquivalents",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-342": {
   "value": "9409000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-343": {
   "value": "-30000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-344": {
   "value": "232000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-345": {
   "value": "793000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-346": {
   "value": "-400000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-347": {
   "value": "58000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-348": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-349": {
   "value": "3381000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-350": {
   "value": "13443000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-351": {
   "value": "786000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-352": {
   "value": "14229000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-353": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-354": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-355": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-356": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-357": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-358": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-359": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-360": {
   "value": "6498000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-361": {
   "value": "6498000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-362": {
   "value": "77000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-363": {
   "value": "6575000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-364": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-365": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-366": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-367": {
   "value": "3000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-368": {
   "value": "-186000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-369": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-370": {
   "value": "2000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-371": {
   "value": "34000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-372": {
   "value": "-147000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-373": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-374": {
   "value": "-147000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-375": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-376": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-377": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-378": {
   "value": "3000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-379": {
   "value": "-186000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-380": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-381": {
   "value": "2000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-382": {
   "value": "6532000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-383": {
   "value": "6351000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-384": {
   "value": "77000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-385": {
   "value": "6428000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-386": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-387": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-388": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-389": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-390": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-391": {
   "value": "5553000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-392": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-393": {
   "value": "-5553000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-394": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-395": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-396": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-397": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:SharesPurchasedForDividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-398": {
   "value": "144000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:SharesPurchasedForDividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-399": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:SharesPurchasedForDividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-400": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:SharesPurchasedForDividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-401": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:SharesPurchasedForDividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-402": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:SharesPurchasedForDividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-403": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:SharesPurchasedForDividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-404": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:SharesPurchasedForDividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-405": {
   "value": "144000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:SharesPurchasedForDividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-406": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:SharesPurchasedForDividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-407": {
   "value": "144000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:SharesPurchasedForDividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-408": {
   "value": "332000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-409": {
   "value": "144000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-410": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-411": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-412": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-413": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-414": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-415": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-416": {
   "value": "476000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-417": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-418": {
   "value": "476000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-419": {
   "value": "19265000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-420": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-421": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-422": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-423": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-424": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-425": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-426": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-427": {
   "value": "19265000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-428": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-429": {
   "value": "19265000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-430": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:ReplacementEmployeeSharePlanIssuedForAcquisitionOfBHPP",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-431": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:ReplacementEmployeeSharePlanIssuedForAcquisitionOfBHPP",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-432": {
   "value": "18000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:ReplacementEmployeeSharePlanIssuedForAcquisitionOfBHPP",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-433": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:ReplacementEmployeeSharePlanIssuedForAcquisitionOfBHPP",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-434": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:ReplacementEmployeeSharePlanIssuedForAcquisitionOfBHPP",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-435": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:ReplacementEmployeeSharePlanIssuedForAcquisitionOfBHPP",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-436": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:ReplacementEmployeeSharePlanIssuedForAcquisitionOfBHPP",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-437": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:ReplacementEmployeeSharePlanIssuedForAcquisitionOfBHPP",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-438": {
   "value": "18000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:ReplacementEmployeeSharePlanIssuedForAcquisitionOfBHPP",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-439": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:ReplacementEmployeeSharePlanIssuedForAcquisitionOfBHPP",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-440": {
   "value": "18000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:ReplacementEmployeeSharePlanIssuedForAcquisitionOfBHPP",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-441": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-442": {
   "value": "45000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-443": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-444": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-445": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-446": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-447": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-448": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-449": {
   "value": "45000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-450": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-451": {
   "value": "45000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-452": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-453": {
   "value": "37000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-454": {
   "value": "-37000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-455": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-456": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-457": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-458": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-459": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-460": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-461": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-462": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-463": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-464": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-465": {
   "value": "65000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-466": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-467": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-468": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-469": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-470": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-471": {
   "value": "65000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-472": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-473": {
   "value": "65000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-474": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-475": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-476": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-477": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-478": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-479": {
   "value": "2070000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-480": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-481": {
   "value": "1018000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-482": {
   "value": "3088000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-483": {
   "value": "72000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-484": {
   "value": "3160000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-485": {
   "value": "5000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ShareIssueRelatedCost",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-486": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ShareIssueRelatedCost",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-487": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ShareIssueRelatedCost",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-488": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ShareIssueRelatedCost",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-489": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ShareIssueRelatedCost",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-490": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ShareIssueRelatedCost",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-491": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ShareIssueRelatedCost",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-492": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ShareIssueRelatedCost",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-493": {
   "value": "5000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ShareIssueRelatedCost",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-494": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ShareIssueRelatedCost",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-495": {
   "value": "5000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ShareIssueRelatedCost",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-496": {
   "value": "29001000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-497": {
   "value": "-38000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-498": {
   "value": "278000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-499": {
   "value": "796000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-500": {
   "value": "-586000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-501": {
   "value": "3541000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-502": {
   "value": "2000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-503": {
   "value": "3342000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-504": {
   "value": "36336000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-505": {
   "value": "791000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-506": {
   "value": "37127000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2023-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-507": {
   "value": "9297000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-508": {
   "value": "-23000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-509": {
   "value": "219000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-510": {
   "value": "793000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-511": {
   "value": "-71000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-512": {
   "value": "462000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-513": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-514": {
   "value": "1398000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-515": {
   "value": "12075000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-516": {
   "value": "800000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-517": {
   "value": "12875000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-518": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-519": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-520": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-521": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-522": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-523": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-524": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-525": {
   "value": "1983000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-526": {
   "value": "1983000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-527": {
   "value": "53000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-528": {
   "value": "2036000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-529": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-530": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-531": {
   "value": "13000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-532": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-533": {
   "value": "-329000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-534": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-535": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-536": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-537": {
   "value": "-316000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-538": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-539": {
   "value": "-316000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-540": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-541": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-542": {
   "value": "13000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-543": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-544": {
   "value": "-329000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-545": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-546": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-547": {
   "value": "1983000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-548": {
   "value": "1667000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-549": {
   "value": "53000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-550": {
   "value": "1720000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-551": {
   "value": "112000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-552": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-553": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-554": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-555": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-556": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-557": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-558": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-559": {
   "value": "112000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-560": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-561": {
   "value": "112000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-562": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-563": {
   "value": "47000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-564": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-565": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-566": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-567": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-568": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-569": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-570": {
   "value": "47000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-571": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-572": {
   "value": "47000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-573": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-574": {
   "value": "40000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-575": {
   "value": "-40000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-576": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-577": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-578": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-579": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-580": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-581": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-582": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-583": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-584": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-585": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-586": {
   "value": "40000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-587": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-588": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-589": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-590": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-591": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-592": {
   "value": "40000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-593": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-594": {
   "value": "40000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-595": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-596": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-597": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-598": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-599": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-600": {
   "value": "404000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-601": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-602": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-603": {
   "value": "404000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-604": {
   "value": "67000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-605": {
   "value": "471000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-606": {
   "value": "9409000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-607": {
   "value": "-30000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-608": {
   "value": "232000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-609": {
   "value": "793000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-610": {
   "value": "-400000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-611": {
   "value": "58000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-612": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-613": {
   "value": "3381000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-614": {
   "value": "13443000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-615": {
   "value": "786000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-616": {
   "value": "14229000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-617": {
   "value": "9010000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-618": {
   "value": "-39000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-619": {
   "value": "211000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-620": {
   "value": "793000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-621": {
   "value": "-12000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-622": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-623": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-624": {
   "value": "6654000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-625": {
   "value": "16617000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-626": {
   "value": "792000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-627": {
   "value": "17409000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-628": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-629": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-630": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-631": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-632": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-633": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-634": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-635": {
   "value": "-4028000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-636": {
   "value": "-4028000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-637": {
   "value": "53000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-638": {
   "value": "-3975000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ProfitLoss",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-639": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-640": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-641": {
   "value": "2000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-642": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-643": {
   "value": "-59000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-644": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-645": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-646": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-647": {
   "value": "-57000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-648": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-649": {
   "value": "-57000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:OtherComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-650": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-651": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-652": {
   "value": "2000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-653": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-654": {
   "value": "-59000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-655": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-656": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-657": {
   "value": "-4028000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-658": {
   "value": "-4085000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-659": {
   "value": "53000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-660": {
   "value": "-4032000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:ComprehensiveIncome",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-661": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-662": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-663": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-664": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-665": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-666": {
   "value": "710000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-667": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-668": {
   "value": "-710000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-669": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-670": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-671": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:Transfers",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-672": {
   "value": "264000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-673": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-674": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-675": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-676": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-677": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-678": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-679": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-680": {
   "value": "264000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-681": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-682": {
   "value": "264000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:DividendReinvestmentPlan",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-683": {
   "value": "23000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-684": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-685": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-686": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-687": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-688": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-689": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-690": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-691": {
   "value": "23000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-692": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-693": {
   "value": "23000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IssueOfEquity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-694": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-695": {
   "value": "32000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-696": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-697": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-698": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-699": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-700": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-701": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-702": {
   "value": "32000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-703": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-704": {
   "value": "32000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanPurchases",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-705": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-706": {
   "value": "48000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-707": {
   "value": "-48000000",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-708": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-709": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-710": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-711": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-712": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-713": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-714": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-715": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "woodsideenergygroupltd:EmployeeSharePlanRedemptions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-716": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-717": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-718": {
   "value": "54000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-719": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-720": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-721": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-722": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-723": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-724": {
   "value": "54000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-725": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-726": {
   "value": "54000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:IncreaseDecreaseThroughSharebasedPaymentTransactions",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-727": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-728": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-729": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-730": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-731": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-732": {
   "value": "248000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-733": {
   "value": "-0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-734": {
   "value": "518000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-735": {
   "value": "766000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-736": {
   "value": "45000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-737": {
   "value": "811000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:DividendsPaid",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2020-01-01T00:00:00/2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-738": {
   "value": "9297000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:IssuedCapitalMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-739": {
   "value": "-23000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:SharesReservedForEmployeeSharePlansMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-740": {
   "value": "219000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:EmployeeBenefitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-741": {
   "value": "793000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-742": {
   "value": "-71000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:ReserveOfCashFlowHedgesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-743": {
   "value": "462000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "woodsideenergygroupltd:DistributableProfitsReserveMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-744": {
   "value": "0",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:MiscellaneousOtherReservesMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-745": {
   "value": "1398000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:RetainedEarningsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-746": {
   "value": "12075000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:EquityAttributableToOwnersOfParentMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-747": {
   "value": "800000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "ifrs-full:ComponentsOfEquityAxis": "ifrs-full:NoncontrollingInterestsMember",
    "unit": "iso4217:USD"
   }
  },
  "fact-748": {
   "value": "12875000000",
   "decimals": -6,
   "dimensions": {
    "concept": "ifrs-full:Equity",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00",
    "unit": "iso4217:USD"
   }
  },
  "fact-753": {
   "value": "About these statements Following the approval by shareholders at the Annual General  Meeting on 19 May 2022, Woodside Petroleum Ltd has  registered the change of company name to Woodside Energy  Group Ltd. Woodside Energy Group Ltd and its controlled  entities (Woodside or the Group) is a for-pro\ufb01t entity limited by shares, incorporated and domiciled in Australia. Its shares  are publicly traded on the Australian Securities Exchange  (ASX), on the Main Market for listed securities of the London  Stock Exchange (LSE) (with trades settled in the form of UK  Depository Interests) and on the New York Stock Exchange  (NYSE) (in the form of Woodside American Depositary Shares).  The nature of the operations and the principal activities of the  Group are described in the Directors\u2019 Report and in the segment  information in Note A.1. The \ufb01nancial statements were authorised for issue in accordance  with a resolution of the Directors on 27 February 2023. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfGeneralInformationAboutFinancialStatementsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-751": {
   "value": "About these statements Following the approval by shareholders at the Annual General  Meeting on 19 May 2022, Woodside Petroleum Ltd has  registered the change of company name to Woodside Energy  Group Ltd. Woodside Energy Group Ltd and its controlled  entities (Woodside or the Group) is a for-pro\ufb01t entity limited by shares, incorporated and domiciled in Australia. Its shares  are publicly traded on the Australian Securities Exchange  (ASX), on the Main Market for listed securities of the London  Stock Exchange (LSE) (with trades settled in the form of UK  Depository Interests) and on the New York Stock Exchange  (NYSE) (in the form of Woodside American Depositary Shares).  The nature of the operations and the principal activities of the  Group are described in the Directors\u2019 Report and in the segment  information in Note A.1. The \ufb01nancial statements were authorised for issue in accordance  with a resolution of the Directors on 27 February 2023. Statement of compliance The \ufb01nancial statements are general purpose \ufb01nancial  statements, which have been prepared in accordance with  the requirements of the Corporations Act 2001, Australian  Accounting Standards and other authoritative pronouncements  of the Australian Accounting Standards Board (AASB). The  \ufb01nancial statements comply with the International Financial  Reporting Standards (IFRS) as issued by the International  Accounting Standards Board. They also include additional  disclosures required for foreign registrants by the United States  Securities and Exchange Commission (US SEC). Subsequent to the merger with BHPP, BHPP\u2019s accounting  policies have been aligned with the Group. The Group\u2019s  accounting policies are consistent with those disclosed in the  Group\u2019s 2021 Financial Statements except for new policies  applicable in 2022. Adoption of new or amended standards and  interpretations effective 1 January 2022 did not result in any  signi\ufb01cant changes to the Group\u2019s accounting policies. Estimates have been revised, where required, to re\ufb02ect current  market conditions including the impact of COVID-19 and  climate change. Updated assumptions used for impairment  assessments and the measurement of onerous contracts are  disclosed in Notes B.4 and D.5 respectively; these assumptions  could change in the future. New estimates and judgements  for signi\ufb01cant transactions during the period including the  recognition of goodwill as a result of the business combination,  the allocation of goodwill to the Group\u2019s cash generating units,  and the sell-down of Train 2 are disclosed in Notes B.5, B.4 and  B.7 respectively. Currency The functional and presentation currency of Woodside and all its  material subsidiaries is the US dollar. Transactions in foreign currencies are initially recorded in the  functional currency of the transacting entity at the exchange  rates ruling at the date of transaction. Monetary assets and  liabilities denominated in foreign currencies at the reporting  date are translated at the rates of exchange ruling at that date.  Exchange differences in the consolidated \ufb01nancial statements  are taken to the income statement. Rounding of amounts The amounts contained in these \ufb01nancial statements have been  rounded to the nearest million dollars under the option available  to the Group under Australian Securities and Investments  Commission (ASIC) Corporations (Rounding in Financial/ Directors\u2019 Reports) Instrument 2016/191 dated 24 March 2016,  unless otherwise stated. Basis of preparation The \ufb01nancial statements have been prepared on a historical cost  basis, except for derivative \ufb01nancial instruments and certain  other \ufb01nancial assets and \ufb01nancial liabilities, which have been  measured at fair value or amortised cost adjusted for changes  in fair value attributable to the risks that are being hedged in  effective hedge relationships. Where not carried at fair value, if  the carrying value of \ufb01nancial assets and \ufb01nancial liabilities does  not approximate their fair value, the fair value has been included  in the notes to the \ufb01nancial statements. The \ufb01nancial statements comprise the \ufb01nancial position and  results of the Group as at and for the year ended 31 December  2022 (refer to Note E.8).  Subsidiaries are fully consolidated from the date on which  control is obtained by the Group and cease to be consolidated  from the date at which the Group ceases to have control. The subsidiaries of the Group apply the same reporting period  and accounting policies as the parent company in their \ufb01nancial  statements. All intercompany balances and transactions,  including unrealised pro\ufb01ts and losses arising from intra-group  transactions, have been eliminated in full. Non-controlling interests are allocated their share of the net  pro\ufb01t after tax in the consolidated income statement and  their share of other comprehensive income net of tax in the  consolidated statement of comprehensive income, and are  presented within equity in the consolidated statement of  \ufb01nancial position, separately from parent shareholders\u2019 equity. The consolidated \ufb01nancial statements provide comparative  information in respect of the previous periods. Where required,  a reclassi\ufb01cation of items in the \ufb01nancial statements of the  previous periods has been made in accordance with the  classi\ufb01cation of items in the \ufb01nancial statements of the  current period. Climate change and energy transition Climate considerations Woodside has considered the impact of climate and the energy  transition in assessing the carrying value of its assets and  liabilities. This note describes climate-related assumptions that  underpin key areas of the \ufb01nancial statements and the potential  short- and long-term impacts differing scenarios could have on  the \ufb01nancial results and \ufb01nancial position of Woodside. Climate change and energy transition (cont.) Financial planning and assumptions Woodside considers a range of climate and macroeconomic  scenarios to help benchmark our long-term price assumptions  and inform our decision making to ensure we maintain a resilient  \ufb01nancial position. The assumptions applied in assessing amounts  within the \ufb01nancial statements are in each case calculated in  accordance with the requirements of the applicable accounting  standards.  Our long-term price assumptions re\ufb02ect management\u2019s current  \u2018best estimate\u2019 scenario in which global governments pursue  decarbonisation as well as other goals such as energy security  and economic development. All price assumptions consider  current legislation in the locations where Woodside operates  and place some weight on scenarios in which the transition to  a low carbon energy system is sufficiently rapid to meet the  goals of the Paris Agreement, as well as scenarios in which the  transition is not, or may not be, sufficiently rapid. They also place  some weight on a range of other assumptions which can drive  prices (e.g. in\ufb02ation) and which are not related to the Paris goals. Woodside\u2019s facilities are subject to physical risks such as oceanic  conditions and are located in regions that experience tropical  cyclones, hurricanes and high ambient temperatures. Woodside  has signi\ufb01cant experience designing and operating facilities  located in harsh environments. Woodside notes that the high degree of uncertainty around the  nature, timing and magnitude of climate-related risks, and the  uncertainty as to how the energy transition will evolve, makes it  difficult to determine and disclose the risks and their potential  impacts with precision.  Woodside continues to monitor the uncertainty around climate  change risks and will revise commodity and carbon pricing  assumptions accordingly. Oil and gas investment cases include  a carbon price assumption which takes into consideration  uncertainty around the impact of climate change. Commodity  pricing assumptions are key value drivers with greater  signi\ufb01cance to assets and liabilities than carbon pricing. Impairment of exploration and evaluation, oil and gas  properties and goodwill In accordance with IFRS, elements of Woodside\u2019s \ufb01nancial  statements are based on reasonable and supportable  assumptions that represent management\u2019s current best estimate  of the range of economic conditions that may exist in the  foreseeable future. The estimation of recoverable amounts for impairment testing  includes estimating what an independent market participant  would pay to acquire the asset as at the reporting date. Market  participants will be guided by their own views on future  economic and technical conditions and therefore Woodside  considers a range of data sources in determining a future price  forecast, including industry and market benchmarks along with  asset sales transaction data.  Price forecasts are adjusted for premiums and discounts  based on the nature and quality of the product. Brent oil price  estimates have considered the impacts of climate policies along  with other factors such as industry investment and cost trends.  There remains signi\ufb01cant uncertainty around how society will  respond to the climate challenge.  The energy transition is expected to bring volatility and there is  uncertainty as to how commodity prices will develop over the  medium and long term. The IEA\u2019s World Energy Outlook 2022  (WEO) explores three main climate change scenarios. The IEA  scenarios are not predictions and the IEA does not have a single  view on the future of the energy system. There is signi\ufb01cant  uncertainty as to whether any of these scenarios will eventuate.  Because Woodside considers what a market participant would  pay to acquire an asset in assessing impairments, these external  scenarios are not necessarily consistent with the pricing  assumptions used for the Group\u2019s impairment assessment  as disclosed in Table A below and Note B.4 Impairment of  exploration and evaluation, oil and gas properties and goodwill.  The WEO explores three main scenarios1: \u2022  The Net Zero Emissions by 2050 Scenario (NZE)  \u2022  The Announced Pledges Scenario (APS)  \u2022  The Stated Policies Scenario (STEPS)  Table A: Average real terms 2022 oil price (US$/bbl, Brent)2,  North Asian LNG price (US$/MMbtu)2 and carbon price  (US$/tCO\u2082-e)3 consistent with IEA dataset compared against  Woodside\u2019s assumptions: Average Brent  (RT US$/bbl) 2023-2026 2027-2031 2032-2036 2037-2040 NZE 59 38 33 31 APS 88 70 65 65 STEPS 92 85 85 88 Woodside 75 70 70 70 Average North Asian  LNG (RT US$/MMbtu) 2023-2026 2027-2031 2032-2036 2037-2040 NZE 18 6 6 6 APS 20 9 9 9 STEPS 21 11 11 11 Woodside 23 9 9 9 Average Carbon  (RT US$/tonne) 2023-2026 2027-2031 2032-2036 2037-2040 NZE 100 135 169 199 APS 98 130 154 172 STEPS 80 80 80 80 Woodside 80 80 80 80 1.  IEA 2022. \u2018World Energy Outlook 2022\u2019. All rights reserved. 2.  Based on data from IEA 2022. \u2018World Energy Outlook 2022\u2019 as modi\ufb01ed by  Woodside analysis. Woodside used interpolation techniques to estimate Brent  annual price points in between the years for which the IEA disclosed price points.  For gas pricing assumptions all non-contracted LNG volumes were assessed at  IEA\u2019s Japan import price, as a proxy for North Asian LNG spot price. Woodside  used interpolation techniques to estimate annual gas price points in between the  years for which the IEA disclosed prices. For oil linked LNG contracts, prices are  derived from the Brent forecasts and the terms of the contracts. 3.  Based on data from IEA 2022. \u2018World Energy Outlook 2022\u2019 as modi\ufb01ed by  Woodside analysis. The IEA only provide carbon prices from 2030 onwards. As a  result, Woodside used a starting point of US$80/tCO\u2082-e consistent with internal  carbon cost pricing. Woodside used the 2022 starting price point and the IEA\u2019s  published 2030 and 2040 carbon prices for each scenario to interpolate annual  price points through to 2040. Climate change and energy transition (cont.) Impairment of exploration and evaluation, oil and gas properties and goodwill (cont.) Refer to Note B.4 for the sensitivity analysis performed on Woodside\u2019s Brent oil pricing assumptions and the potential impact on the carrying value of Woodside\u2019s non-current assets. The benchmarked pricing above has limitations and is based on a wide range of assumptions. The impact of the benchmark pricing assumptions could be managed by decisions Woodside could make in response such as acquisitions, divestments or cost reductions as well as other consequential changes. The scenarios must therefore not be interpreted as Woodside\u2019s investment guidance. These are scenarios, not forecasts, and no likelihood is assigned to any of these scenarios eventuating. Impact on remaining life of assets Oil and gas properties relating to transferred exploration and evaluation and offshore plant and equipment are depreciated using the unit of production basis over either proved or proved plus probable reserves. The energy transition may result in changes to the expected useful life of oil and gas properties and economically recoverable reserves and resources thereby accelerating depreciation charges or resulting in an impairment. Restoration and other provisions The energy transition may result in restoration activities occurring earlier than expected. 54% (2021: 65%) of the Group\u2019s non-current restoration liabilities are expected to be settled more than 10 years in the future. Restoration cost estimates require judgemental assumptions regarding removal date, environmental legislation and regulations and the extent of restoration activities required. These cost estimates may change in the future, as a result of increased regulatory scrutiny and the energy transition. Woodside continues to monitor the uncertainty around climate change risks to assess if additional changes to restoration provisions should be recognised. Onerous contracts Closure or early termination of activities may lead to supply contracts becoming onerous. As at 31 December 2022, the Corpus Christi contract is expected to return a positive value and on this basis the onerous contract provision has been reversed to nil (2021: $214 million). This and other contractual arrangements could be impacted by adverse market conditions arising from climate-related factors. Deferred tax assets The Group has determined that it is probable that sufficient future taxable income will be available to utilise the deferred tax assets relating to carry forward unused tax losses and credits recognised as at 31 December 2022. The recoverability of deferred tax assets is dependent on the Group\u2019s future taxable income which can be impacted by the uncertainty of commodity and carbon pricing. Regulatory environment Regulation of climate-related emissions can change over time. Woodside is not currently aware of speci\ufb01c proposals that would materially change the assumptions underpinning the \ufb01nancial statements. Key estimates and judgements In applying the Group\u2019s accounting policies, management continually evaluates judgements, estimates and assumptions based on experience and other factors, including expectations of future events that may have an impact on the Group. All judgements, estimates and assumptions made are believed to be reasonable based on the most current set of circumstances known to management, and actual results may differ. Signi\ufb01cant judgements, estimates and assumptions made by management in the preparation of these \ufb01nancial statements are found in the following notes: Note A.1 Revenue from contracts with customers Page 110 Note A.5 Taxes Page 115 Note B.2 Exploration and evaluation Page 120 Note B.3 Oil and gas properties Page 121 Note B.4 Impairment of exploration and evaluation, oil and gas properties and goodwill Page 123 Note B.5 Business combination Page 128 Note B.6 Signi\ufb01cant production and growth asset acquisitions Page 130 Note B.7 Disposal of assets Page 131 Note D.5 Provisions Page 138 Note D.6 Other \ufb01nancial assets and liabilities Page 140 Note D.7 Leases Page 143 Note E.6 Joint arrangements Page 149 Recognition and measurement  Revenue from contracts with customers Revenue is recognised when or as the Group transfers control  of products or provides services to a customer at the amount  to which the Group expects to be entitled. If the consideration  includes a variable component, the Group estimates the amount  of the expected consideration receivable. Variable consideration  is estimated throughout the contract and is recognised to the  extent that it is highly probable a signi\ufb01cant reversal will  not occur.  \u2022  Revenue from sale of hydrocarbons \u2013 Revenue from the sale  of hydrocarbons is recognised at a point in time when control  of the product is transferred to the customer. Revenue from  take or pay contracts is recorded as unearned revenue until  the product has been drawn by the customer (transfer of  control), at which time it is recognised in earnings. \u2022  Other operating revenue \u2013 Revenue earned from LNG  processing and other services is recognised over time as  the services are rendered. Expenses \u2022  Royalties, excise and levies \u2013 Royalties, excise and levies are  considered to be production-based taxes and are therefore  accrued on the basis of the Group\u2019s entitlement to physical  production. \u2022  Depreciation and amortisation \u2013 Refer to Note B.3. \u2022  Impairment and impairment reversals \u2013 Refer to Note B.4. \u2022  Leases \u2013 Refer to Note D.7. \u2022  Employee bene\ufb01ts \u2013 Refer to Note E.2.  Key estimates and judgements Revenue from contracts with customers  The transaction price at the date control passes for sales made subject  to provisional pricing periods in oil and condensate contracts is  determined with reference to quoted commodity prices.  Judgement is also used to determine if it is highly probable that a  signi\ufb01cant reversal will not occur in relation to revenue recognised  during open pricing periods in LNG contracts. The Group estimates  variable consideration based on available information from contract  negotiations and market indicators. Earnings/(losses) per share is calculated by dividing the pro\ufb01t/ (loss) for the year attributable to ordinary equity holders of the parent by the weighted average number of ordinary shares on issue during the year. The weighted average number of shares makes allowance for shares reserved for employee share plans. Diluted earnings/(losses) per share is calculated by adjusting basic earnings/(losses) per share by the number of ordinary shares that would be issued on conversion of all the dilutive potential ordinary shares into ordinary shares. At 31 December 2022, 13,061,376 awards (2021: 9,023,439 awards) granted under the Woodside employee share plans are considered dilutive. Total outstanding share awards as at 31 December 2020 were 9,392,203 and considered anti-dilutive due to the loss position in 2020. There have been no signi\ufb01cant transactions involving ordinary shares between the reporting date and the date of completion  of these \ufb01nancial statements. Key estimates and judgements (a) Income tax classi\ufb01cation Judgement is required when determining whether a particular tax is an income tax or another type of tax. PRRT is considered, for accounting purposes, to be an income tax. Accounting for deferred tax is applied to income taxes as described above, but is not applied to other types of taxes, e.g. North West Shelf royalties, excise and levies which are recognised in cost of sales in the income statement. (b)  Deferred tax asset recognition Income tax losses and credits: Deferred tax assets (DTAs) relating to carry forward unused tax losses and credits arising from the USA Tax Consolidation Group (USA TCG) of $1,371 million (2021: nil) and $93 million (2021: nil) arising from regions other than Australia and the USA have been recognised. The Group has determined that it is probable that sufficient future taxable income will be available to utilise those losses within those regions. Refer to Note E.9(a) for details of tax consolidated groups. DTAs relating to carry forward unused tax losses and credits of  $250 million from the USA TCG, $146 million from USA entities outside of the USA TCG and $1,061 million from regions other than Australia and the USA have not been recognised as it is not currently probable that the assets will be utilised based on current planned activities in those regions (2021: $497 million unrecognised DTAs). PRRT: The recoverability of PRRT deferred tax assets is primarily assessed with regard to future oil price assumptions impacting forecast future taxable pro\ufb01ts. As a result of higher actual and forecast assessable revenues supporting future recoverability of unrecognised quarantined exploration and general expenditure, the Pluto PRRT DTA has increased by $1,362 million. In determining the amount of DTA that is considered probable and eligible for recognition, forecast future taxable pro\ufb01ts are risk-adjusted where appropriate by a market premium risk rate to re\ufb02ect uncertainty inherent in long-term forecasts. A long-term bond rate of 3.2%  (31 December 2021: 1.5%) was used for the purposes of augmentation. Certain deferred tax assets on deductible temporary differences have not been recognised on the basis that deductions from future augmentation of the recognised deductible temporary difference will be sufficient to offset future taxable pro\ufb01ts. $6,523 million (2021:  $4,507 million) relates to the North West Shelf Project, $189 million (2021: $1,432 million) relates to remaining Pluto quarantined exploration expenditure and $831 million (2021: $1,071 million) relates to Wheatstone. A long-term bond rate of 3.2% (31 December 2021: 1.5%) was used for the purposes of augmentation. Had an alternative approach been used to assess recovery of the deferred tax assets, whereby future augmentation was not included in the assessment, additional deferred tax assets would be recognised, with a corresponding bene\ufb01t to tax expense. It was determined that the approach adopted provides the most meaningful information on the implications of the PRRT regime, whilst ensuring compliance with AASB 112/ IAS 12 Income Taxes. (c) Uncertain tax positions The Group has tax matters, litigation and other claims, for which the timing of resolution and potential economic out\ufb02ows are uncertain. Where the Group assesses an outcome for any tax matter, litigation or other claim as more likely than not to be accepted by the relevant tax authority, the position is adopted in the reported tax balances. Because of the complexity of some of these positions the ultimate outcome may differ from the current estimate of the position. These differences will be re\ufb02ected as increases or decreases to tax expense in the period in which new information is available. A.5  Taxes (cont.) Tax transparency code Woodside participates in the Australian Board of Taxation\u2019s voluntary Tax Transparency Code (TTC). To increase public con\ufb01dence in the contributions and compliance of corporate taxpayers, the TTC recommends public disclosure of tax information. Part A of the recommended disclosures are addressed within this Taxes note and Part B within our Sustainable Development Report, supported by additional information on our website. Recognition and measurement Current tax assets and liabilities are measured at the amount expected to be recovered from or paid to the taxation authorities. Deferred tax assets and liabilities are measured at the tax rates that are expected to apply in the period in which the liability is settled or the asset is realised. The tax rates and laws used to determine the amount are based on those that have been enacted or substantially enacted by the end of the reporting period. Income taxes relating to items recognised directly in equity are recognised in equity. Current taxes Current tax expense is the expected tax payable on the taxable income for the current year and any adjustment to tax paid in respect of previous years. Deferred taxes Deferred tax expense represents movements in the temporary differences between the carrying amount of an asset or liability in the consolidated statement of \ufb01nancial position and its tax base. With the exception of those noted below, deferred tax liabilities are recognised for all taxable temporary differences. Deferred tax assets are recognised for deductible temporary differences, unused tax losses and tax credits only if it is probable that sufficient future taxable income will be available to utilise those temporary differences and losses. Deferred tax is not recognised if the temporary difference arises from goodwill or from the initial recognition (other than in a business combination) of assets and liabilities in a transaction that affects neither accounting pro\ufb01t nor the taxable pro\ufb01t. In relation to PRRT, the impact of future augmentation on expenditure is included in the determination of future taxable pro\ufb01ts when assessing the extent to which a deferred tax asset can be recognised in the consolidated statement of \ufb01nancial position. Offsetting deferred tax balances Deferred tax assets and liabilities are offset only if there is a legally enforceable right to offset current tax assets and liabilities and when they relate to income taxes levied by the same taxation authority on either the same taxable entity or different taxable entities that the Group intends to settle its current tax assets and liabilities on a net basis. Refer to Notes E.8 and E.9 for detail on the tax consolidated groups. Recognition and measurement Expenditure on exploration and evaluation is accounted for in accordance with the area of interest method. Areas of interest are based on a geographical area for which the rights of tenure are current. All exploration and evaluation expenditure, including general permit activity, geological and geophysical costs and new venture activity costs, is expensed as incurred except for the following: \u2022  where the expenditure relates to an exploration discovery for which the assessment of the existence or otherwise of economically recoverable hydrocarbons is not yet complete; or \u2022  where the expenditure is expected to be recouped through successful exploitation of the area of interest, or alternatively, by its sale. The costs of acquiring interests in new exploration and evaluation licences are capitalised. The costs of drilling exploration wells are initially capitalised pending the results of the well. Costs are expensed where the well does not result in the successful discovery of economically recoverable hydrocarbons and the recognition of an area of interest. Subsequent to the recognition of an area of interest, all further evaluation costs relating to that area of interest are capitalised. Upon approval for the commercial development of an area of interest, accumulated expenditure for the area of interest is transferred to oil and gas properties. In the consolidated statement of cash \ufb02ows, those cash \ufb02ows associated with capitalised exploration and evaluation expenditure, including unsuccessful wells, are classi\ufb01ed as cash \ufb02ows used in investing activities. Exploration commitments The Group has exploration expenditure obligations which are contracted for, but not provided for in the \ufb01nancial statements. These obligations may be varied from time to time and are expected to be ful\ufb01lled in the normal course of the Group\u2019s operations. Impairment Refer to Note B.4 for details on impairment, including any write-offs. Key estimates and judgements (a) Area of interest Typically, an area of interest (AOI) is de\ufb01ned by the Group as an individual geographical area whereby the presence of hydrocarbons is considered favourable or proved to exist. The Group has established criteria to recognise and maintain an AOI. (b) Transfer to projects in development Development activities commence after project sanctioning by the appropriate level of management. Judgement is applied by management in determining when the project is technically feasible and economically viable to transfer to projects in development. Key estimates and judgements (a) Reserves The estimation of reserves requires signi\ufb01cant management judgement and interpretation of complex geological and geophysical models in order to make an assessment of the size, shape, depth and quality of reservoirs, and their anticipated recoveries. Estimates of oil and natural gas reserves are used to calculate depreciation and amortisation charges for the Group\u2019s oil and gas properties. Judgement is used in determining the economic reserve base applied to each asset. Typically, late life oil assets use proved reserves. Estimates are reviewed at least annually or when there are changes in the economic circumstances impacting speci\ufb01c assets or asset groups. These changes may impact depreciation, asset carrying values, restoration provisions and deferred tax balances. If proved plus probable (2P) reserves estimates are revised downwards, earnings could be affected by higher depreciation expense or an immediate write-down of the asset\u2019s carrying value. (b) Depreciation and amortisation Judgement is required to determine when assets are available for use to commence depreciation and amortisation. Depreciation and amortisation generally commences on \ufb01rst production. B.3  Oil and gas properties (cont.) Recognition and measurement Oil and gas properties are stated at cost less accumulated depreciation and impairment charges. Oil and gas properties include the costs to acquire, construct, install or complete production and infrastructure facilities such as pipelines and platforms, capitalised borrowing costs, transferred exploration and evaluation assets, development wells and the estimated cost of dismantling and restoration. Subsequent capital costs, including major maintenance, are included in the asset\u2019s carrying amount only when it is probable that future economic bene\ufb01ts associated with the item will \ufb02ow to the Group and the cost of the item can be reliably measured. Depreciation and amortisation Oil and gas properties are depreciated to their estimated residual values at rates based on their expected useful lives. Transferred exploration and evaluation and offshore plant and equipment are depreciated using the unit of production basis over proved plus probable reserves or proved reserves for late life assets. The depreciable amount for the unit of production basis excludes future development costs necessary to bring probable reserves into production. For certain offshore assets, methodologies using proved and probable reserves are adjusted to best re\ufb02ect the expected pattern of consumption. Onshore plant and equipment is depreciated using a straight-line basis over the lesser of useful life and the life of proved plus probable reserves. On a straight-line basis the assets have an estimated useful life of 5-50 years. All other items of oil and gas properties are depreciated using the straight-line method over their useful life. They are depreciated as follows: \u2022  Buildings \u2013 24-50 years; \u2022  Plant and equipment \u2013 2-40 years; and \u2022  Land is not depreciated. Impairment Refer to Note B.4 for details on impairment. Capital commitments The Group has capital expenditure commitments contracted for, but not provided for in the \ufb01nancial statements, of $7,762 million as at 31 December 2022 (2021: $7,875 million). Capital expenditure commitments relate predominantly to the Scarborough and Sangomar projects. B.4   Impairment of exploration and evaluation, oil and gas properties and goodwill Exploration and evaluation Impairment testing The recoverability of the carrying amount of exploration and evaluation assets is dependent on successful development and commercial exploitation, or alternatively sale of the respective AOI. Each AOI is reviewed half-yearly to determine whether economic quantities of hydrocarbons have been found, or whether further exploration and evaluation work is underway or planned to support continued carry forward of capitalised costs. Where a potential impairment is indicated for an AOI, an assessment is performed using a fair value less costs to dispose (FVLCD) method to determine its recoverable amount. Upon approval for commercial development, exploration and evaluation assets are assessed for impairment before they are transferred to oil and gas properties. Impairment calculations The recoverable amounts of exploration and evaluation assets are determined using FVLCD, as there is no value in use (VIU). Costs to dispose are the incremental costs directly attributable to the disposal of an asset, excluding \ufb01nance costs and income tax expense. If the carrying amount of an AOI exceeds its recoverable amount, the AOI is written down to its recoverable amount and an impairment loss is recognised in the consolidated income statement. For assets previously impaired, if the recoverable amount exceeds the carrying amount, the impairment is reversed, but only to the extent that the asset\u2019s carrying amount does not exceed the carrying amount that would have been recognised if no impairment had occurred. Oil and gas properties Impairment testing The carrying amounts of oil and gas properties are assessed half-yearly to determine whether there is an indicator of impairment or impairment reversal for those assets which have previously been impaired. Indicators of impairment and impairment reversals include changes in reserves, expected future sales prices or costs. Oil and gas properties are assessed for impairment indicators and impairments on a cash-generating unit (CGU) basis. CGUs are determined as offshore and onshore facilities, infrastructure and associated oil and/or gas \ufb01elds. If there is an indicator of impairment or impairment reversal for a CGU, its recoverable amount is calculated and compared with the CGU\u2019s carrying value (refer to impairment calculations below). Goodwill For the purpose of impairment testing, goodwill acquired in a business combination is, from the acquisition date, allocated to each of the Group\u2019s cash-generating units (CGUs) that are expected to bene\ufb01t from the combination, irrespective of whether other assets or liabilities of the acquiree are assigned to those units. Goodwill is tested for impairment at least annually and more frequently if events or changes in circumstances indicate that it might be impaired. Impairment of goodwill is determined by assessing the recoverable amount of each CGU to which the goodwill relates and comparing it with its carrying value, which includes deferred taxes (refer to impairment calculations below and Note B.5). When part of an operation is disposed of, any goodwill associated with the disposed operation is included in the carrying amount of the operation in determining the gain or loss on disposal. Goodwill and oil and gas impairment calculations The recoverable amount of an asset or CGU is determined as the higher of its VIU and FVLCD. VIU is determined by estimating future cash \ufb02ows after taking into account the risks speci\ufb01c to the asset and discounting to present value using an appropriate discount rate. FVLCD is the price that would be received to sell the asset in an orderly transaction between market participants and does not re\ufb02ect the effects of factors that may be speci\ufb01c to the Group. In determining FVLCD, recent market transactions are considered. If no such transactions can be identi\ufb01ed, an appropriate valuation model, such as discounted cash \ufb02ow techniques, are applied on a post-tax basis using an appropriate discount rate and estimates are made about the assumptions market participants would use when pricing the asset or CGU. If the carrying amount of an asset or CGU, including any allocated goodwill, exceeds its recoverable amount, the asset or CGU is written down to its recoverable amount and an impairment loss is recognised in the consolidated income statement. Any impairment losses are \ufb01rst allocated to reduce the carrying amount of any goodwill allocated, with the remaining impairment losses allocated to the relevant assets. If the recoverable amount of an asset or CGU exceeds its carrying amount, and that asset has previously been impaired, the impairment is reversed. The carrying amount of the asset or CGU is increased to its recoverable amount, but only to the extent that the carrying amount does not exceed the value that would have been determined, net of depreciation or amortisation, if no impairment had been recognised. Impairments of goodwill are not reversed. Key estimates and judgements  CGU determination Identi\ufb01cation of a CGU requires management judgement. In  determining CGUs for acquired assets during the reporting period,  management has assessed based on the smallest group of assets that  generate signi\ufb01cant cash in\ufb02ows that are independent from other  assets or groups of assets. Allocation of goodwill Allocation of goodwill to the relevant CGUs requires management  judgement. The goodwill arising from the merger has been allocated  to relevant CGUs which are expected to bene\ufb01t from the expected  synergies as a result of the merger.  Recoverable amount calculation key assumptions  In determining the recoverable amount of CGUs, estimates are made  regarding the present value of future cash \ufb02ows when determining the  FVLCD. These estimates require signi\ufb01cant management judgement  and are subject to risk and uncertainty, and hence changes in economic  conditions can also affect the assumptions used and the rates used to  discount future cash \ufb02ow estimates. The basis for each estimate used to determine recoverable amounts as  at 31 December 2022 is set out below: \u2022  Resource estimates \u2013 2P and a portion of 2C reserves (where  applicable) for oil and gas properties. The reserves are as disclosed  in the Reserves and Resources Statement in the 31 December 2022  Annual Report. \u2022  In\ufb02ation rate \u2013 an in\ufb02ation rate of 2.0% has been applied for US  based assets and 2.5% for Australian based assets. \u2022  Foreign exchange rates \u2013 a rate of $0.75 US$:AU$ is based on  management\u2019s view of long-term exchange rates. Key estimates and judgements (cont.) Recoverable amount calculation key assumptions (cont.) \u2022  Discount rates \u2013 a range of post-tax discount rates between 8%  and 11.5% for CGUs has been applied. The discount rate re\ufb02ects an  assessment of the risks speci\ufb01c to the asset. \u2022  Carbon pricing \u2013 a long-term price of US$80/tonne of emissions  (real terms 2022) is based on management\u2019s assumptions on  carbon cost pricing and incorporates an evaluation of climate risk.  This is applicable to Australian emissions that exceed facility- speci\ufb01c baselines in accordance with Australian regulations, as well  as global emissions that exceed voluntary corporate net emissions  targets. Woodside continues to monitor the uncertainty around  climate change risks and will revise carbon pricing assumptions  accordingly. Refer to Climate change and energy transition section  within the basis of preparation for further information. \u2022  LNG price \u2013 the majority of LNG sales contracts are linked to an oil  price marker; accordingly the LNG prices used are consistent with  oil price assumptions. \u2022  Brent oil prices \u2013 derived from long-term views of global supply  and demand, building upon past experience of the industry and  consistent with external sources. Prices are adjusted for premiums  and discounts based on the nature and quality of the product. Brent  oil price estimates have considered the risk of climate policies along  with other factors such as industry investment and cost trends.  There is signi\ufb01cant uncertainty around how society will respond  to the climate challenge; Woodside\u2019s pricing assumptions re\ufb02ect  a \u2018best estimate\u2019 scenario in which global governments pursue  decarbonisation as well as other goals such as energy security  and economic development. As with carbon pricing, Woodside  continues to monitor this uncertainty and will revise its oil pricing  assumptions accordingly in its transition to a lower carbon  economy. Further information on climate change risk is provided  in the Climate change and energy transition section within the basis  of preparation. The nominal Brent oil prices (US$/bbl) used were: 2023 2024 2025 2026 2027 2028 31 December 20221 87 78 74 76 77 79 31 December 20212 71 68 69 70 72 73 1.   Long-term oil prices are based on US$70/bbl (2022 real terms) from  2025 and prices are escalated at 2.0% onwards.  2.  Long-term oil prices are based on US$65/bbl (2022 real terms) from  2024 and prices are escalated at 2.0% onwards. Key estimates and judgements CGU determination Identi\ufb01cation of a CGU requires management judgement. For the year ended 31 December 2021, management has determined that the Scarborough and Pluto Train 2 development concept integrates with the existing Pluto onshore assets and is the smallest group of assets that generate signi\ufb01cant cash in\ufb02ows that are independent from other assets or group of assets. Recoverable amount calculation key assumptions In determining the recoverable amount of CGUs, estimates are made regarding the present value of future cash \ufb02ows when determining the VIU. These estimates require signi\ufb01cant management judgement and are subject to risk and uncertainty, and hence changes in economic conditions can also affect the assumptions used and  the rates used to discount future cash \ufb02ow estimates. The basis for each estimate used to determine recoverable amounts as at 31 December 2021 is set out below: \u2022  Resource estimates \u2013 2P reserves for oil and gas properties, except for NWS Oil (Okha) which is based on 1P reserves due to the reclassi\ufb01cation to a late life asset. The reserves are as disclosed in the Reserves and resources statement in the 31 December 2021 Annual Report on pages 55-59. \u2022  In\ufb02ation rate \u2013 an in\ufb02ation rate of 2.0% has been applied. \u2022  Foreign exchange rates \u2013 a rate of $0.75 US$:AU$ is based on management\u2019s view of long-term exchange rates. \u2022  Discount rates \u2013 a range of pre-tax discount rates between 8.9% and 11.6% (post-tax discount rate 7.5%-8.5%) for CGUs has been applied. The discount rate re\ufb02ects an assessment of the risks speci\ufb01c to the asset. \u2022  An evaluation of climate risk is re\ufb02ected in Woodside's assumptions on carbon cost pricing, including a long-term Australian carbon price of US$80/tonne of emissions (real terms 2022). This is applicable to Australian emissions that exceed facility-speci\ufb01c baselines in accordance with Australian regulations, as well as global emissions that exceed voluntary corporate net emissions targets. Woodside continues to monitor the uncertainty around climate change risks and will revise carbon pricing assumptions accordingly. \u2022  LNG price \u2013 the majority of LNG sales contracts are linked to an oil price marker; accordingly the LNG prices used are consistent with oil price assumptions. \u2022  Brent oil prices \u2013 derived from long-term views of global supply and demand, building upon past experience of the industry and consistent with external sources. Prices are adjusted for premiums and discounts based on the nature and quality of the product. Brent oil price estimates have considered the risk of climate policies along with other factors such as industry investment and cost trends. There is signi\ufb01cant uncertainty around how society will respond to the climate challenge; Woodside\u2019s pricing assumptions re\ufb02ect a \u2018most-likely\u2019 scenario in which global governments pursue decarbonisation as well as other goals such as energy security and economic development. As with carbon pricing, Woodside continues to monitor this uncertainty and will revise its oil pricing assumptions accordingly in its transition to a lower carbon economy. Further information on climate change risk is provided  in Woodside\u2019s Climate Report 2021. The nominal Brent oil prices  (US$/bbl) used were: 2022 2023 2024 2025 2026 2027 31 December 20211 73 71 68 69 70 72 30 June 20202 57 62 67 72 73 75 1.  Based on US$65/bbl (2022 real terms) from 2024 with prices escalated at 2.0% annually thereafter. 2.  Based on US$65/bbl (2020 real terms) from 2025 with prices escalated at 2.0% annually thereafter. Business combination accounting The acquisition method of accounting is used to account for all business combinations, including business combinations involving entities or businesses under common control, regardless of whether equity instruments are issued or liabilities incurred or assumed at the date of exchange. Where equity instruments are issued in an acquisition, the fair value of the instruments is their published market price as at the date of exchange. Transaction costs arising on the issue of equity instruments are recognised directly in equity. Transaction costs that were not directly attributable to the issue of shares are expensed as incurred. Contractual assets and liabilities in respect of sales agreements are recognised at fair value. Restoration provisions are recognised on acquisition at fair value. Key estimates and judgements (a) Fair value determination for net assets acquired Judgement is required to determine the fair value of assets acquired and liabilities assumed in a business combination, which can have a material impact on resultant goodwill. This includes the use of a cash \ufb02ow model to estimate the expected future cash \ufb02ows of the oil and gas assets acquired, based on reserves and resources at acquisition date and the discount rate used. The expected future cash \ufb02ows are based on estimates of future production, commodity and carbon prices, operating costs, and forecast capital expenditures at acquisition date. Restoration provisions require judgemental assumptions regarding removal date, environmental legislation and regulations and the extent of restoration activities required in determining the cost estimate. Carry forward tax losses are recognised only if it is probable that sufficient future taxable income will be available to utilise the losses. (b) Goodwill allocation Judgement is required in the allocation of goodwill to the Group\u2019s CGUs that are expected to bene\ufb01t from the synergies of the business combination. Refer to Note B.4 for the details of the goodwill allocation. Key estimates and judgements Nature of acquisition Judgement was required to determine if the transaction was the acquisition of an asset or a business combination. The Sangomar project was in the early phase of development and a substantive process that had the ability to convert inputs to outputs was not present and therefore the acquisition in 2021 was treated as asset acquisitions. Key estimates and judgements Sell-down of Train 2 Given the arrangements include provisions for GIP to sell its 49% interest back to Woodside if the status of key regulatory environmental approvals materially changes and the requirement for Woodside to fund up to $822 million of GIP\u2019s share in the event of a cost overrun, judgement is required to determine if the sell- down of Train 2 constitutes a sale and if a portion of the transaction price should be considered a variable consideration. Judgement was used to determine that the sell-down of  Train 2 constituted a sale given the various conditions included in the sale and purchase agreement. The Group determined that a sale occurred as control of the 49% interest was passed to GIP on completion date. Control is determined as the ability to direct the use of, and obtain substantially all of the economic bene\ufb01ts of, the associated interest. Judgement was used to determine if it is highly probable that a signi\ufb01cant reversal will not occur in relation to the consideration received. The Group estimated the variable consideration based on the construction capital expenditure cost pro\ufb01le, the development schedule, and assessing the probability and impact of any event which may result in a signi\ufb01cant reversal. The constraining estimates of variable consideration have been applied resulting  in the initial pre-tax gain on sale of $427 million. The variable consideration is remeasured at each reporting period with any changes recognised through the consolidated income statement. As at 31 December 2022, the variable consideration has been remeasured with a $71 million revaluation gain recognised as other income. Recognition and measurement  Cash and cash equivalents in the consolidated statement of  \ufb01nancial position comprise cash at bank and short-term deposits  with an original maturity of three months or less. Cash and  cash equivalents are stated at face value in the consolidated  statement of \ufb01nancial position. Cash and cash equivalents  include $12 million (2021: nil) restricted by legal or contractual  arrangements.  Recognition and measurement All borrowings are initially recognised at fair value less  transaction costs. Borrowings are subsequently carried at  amortised cost. Any difference between the proceeds received  and the redemption amount is recognised in the income  statement over the period of the borrowings using the effective  interest method. Borrowings designated as a hedged item are measured at  amortised cost adjusted to record changes in the fair value of  risks that are being hedged in fair value hedges. The changes in  the fair value risks of the hedged item resulted in a gain of  $7 million being recorded (2021: gain of $5 million), and a loss  of $7 million recorded on the hedging instrument (2021: loss of  $7 million). All bonds, notes and facilities are subject to various covenants  and negative pledges restricting future secured borrowings,  subject to a number of permitted lien exceptions. Neither the  covenants nor the negative pledges have been breached at any  time during the reporting period. Recognition and measurement Issued capital Ordinary shares are classi\ufb01ed as equity and recorded at the value of consideration received. The cost of issuing shares is shown in share capital as a deduction, net of tax, from the proceeds. Reserved shares Reserved shares are the Group\u2019s own equity instruments, which are reacquired for later use in employee share-based payment arrangements or the Dividend Reinvestment Plan (DRP). These shares are deducted from equity. No gain or loss is recognised in the income statement on the purchase, sale, issue or cancellation of the Group\u2019s own equity instruments. Recognition and measurement Trade receivables are initially recognised at the transaction price determined under AASB 15/ IFRS 15 Revenue from Contracts with Customers. Other receivables are initially recognised at fair value. Receivables that satisfy the contractual cash \ufb02ow and business model tests are subsequently measured at amortised cost less an allowance for uncollectable amounts. Uncollectable amounts are determined using the expected loss impairment model. Collectability and impairment are assessed on a regular basis. Subsequent recoveries of amounts previously written off are credited against other expenses in the consolidated income statement. Certain receivables that do not satisfy the contractual cash \ufb02ow and business model tests are subsequently measured at fair value (refer to Note D.6). The Group\u2019s customers are required to pay in accordance with agreed payment terms. Depending on the product, settlement terms are 14 to 30 days from the date of invoice or bill of lading and customers regularly pay on time. There are no signi\ufb01cant overdue trade receivables as at the end of the reporting period (2021: nil). Fair value The carrying amount of trade and other receivables approximates their fair value. Foreign exchange risk The Group held $174 million of receivables at 31 December 2022 (2021: $121 million) in currencies other than US dollars (predominantly Australian dollars). Loans receivable On 9 January 2020, Woodside Energy Finance (UK) Ltd entered into a secured loan agreement with Petrosen (the Senegal National Oil Company), to provide up to $450 million for the purpose of funding Sangomar project costs. The facility has a maximum term of 12 years and semi-annual repayments of the loan are due to commence at the earlier of 12 months after RFSU or 30 June 2025. The carrying amount of the loan receivable is $408 million at 31 December 2022 (2021: $335 million), which approximates its fair value. The remaining balance of loans receivable is due from non-controlling interests. Recognition and measurement Inventories include hydrocarbon stocks, consumable supplies and maintenance spares. Inventories are valued at the lower of cost and net realisable value. Cost is determined on a weighted average basis and includes direct costs and an appropriate portion of \ufb01xed and variable production overheads where applicable. Inventories determined to be obsolete or damaged are written down to net realisable value, being the estimated selling price less selling costs. Recognition and measurement Trade and other payables are carried at amortised cost and are recognised when goods and services are received, whether or not billed to the Group, prior to the end of the reporting period. Fair value The carrying amount of payables approximates their fair value. Foreign exchange risk The Group held $657 million of payables at 31 December 2022  (2021: $311 million) in currencies other than US dollars (predominantly Australian dollars). Maturity pro\ufb01le of payables The Group\u2019s payables balances at 31 December 2022 and 31 December 2021 are due for payment within a year. Recognition and measurement Provisions are recognised when the Group has a present obligation (legal or constructive) as a result of a past event, it is probable that an out\ufb02ow of resources embodying economic bene\ufb01ts will be required to settle the obligation and a reliable estimate can be made of the amount of the obligation. Restoration The restoration provision is \ufb01rst recognised in the period in which the obligation arises. The nature of restoration activities includes the removal of facilities, abandonment of wells and restoration of affected areas. Restoration provisions are updated annually, with the corresponding movement recognised against the related exploration and evaluation assets or oil and gas properties or expensed for late life projects with no corresponding asset. Over time, the liability is increased for the change in the present value based on a pre-tax discount rate appropriate to the risks inherent in the liability. The unwinding of the discount is recorded as an accretion charge within \ufb01nance costs. The carrying amount capitalised in oil and gas properties is depreciated over the useful life of the related asset (refer to Note B.3). Costs incurred that relate to an existing condition caused by  past operations, and which do not have a future economic bene\ufb01t, are expensed. Key estimates and judgements (a) Restoration obligations The Group estimates the future decommissioning and remediation costs of offshore oil and gas platforms, offshore and onshore production facilities, wells and pipelines at different stages of the development and construction of assets or facilities. In many instances, decommissioning of assets occurs many years into the future. The Group\u2019s restoration obligations are based on compliance with the requirements of relevant regulations which vary for different jurisdictions. For example Australian regulations require full removal for offshore assets unless regulator approval is received to decommission in-situ. The Group maintains technical expertise to ensure that industry learnings, scienti\ufb01c research and local and international guidelines are reviewed in assessing its restoration obligations. The restoration obligation requires judgemental assumptions regarding removal date, environmental legislation and regulations, the extent of restoration activities required, the engineering methodology for estimating cost, technologies used in determining the decommissioning cost, and liability-speci\ufb01c discount rates to determine the present value of these cash \ufb02ows. The Group applies either the \u2018expected outcome\u2019 approach or \u2018expected value\u2019 approach in assessing the cost estimate, re\ufb02ecting a difference in approach to cost estimation for heritage Woodside and heritage BHPP assets. Both approaches are supported by AASB 137/ IAS 37 Provisions, Contingent Liabilities and Contingent Assets, produce reliable estimates and are widely used in practice. Heritage Woodside assets refer to assets held by the Group prior to the BHPP merger. Heritage BHPP assets refers to assets acquired from BHP but excludes the commonly held assets by both heritage entities. Expected outcome approach This approach is used for heritage Woodside assets, and those assets commonly held by both heritage entities. The following cost assumptions are applied: \u2022  for onshore assets, provision has been made for the removal of production facilities and above ground pipelines using current restoration standards and techniques and taking into account risks and uncertainties; and \u2022  for offshore assets, provision has been made for the plug and abandonment of wells and the removal of offshore platform topsides, \ufb02oating production storage offloading (FPSO) and some subsea infrastructure. It is currently the Group\u2019s assumption that in some regulatory jurisdictions and environments, certain pipelines and infrastructure, parts of offshore platform substructures, and certain subsea infrastructure are decommissioned in-situ where it can be demonstrated that this will deliver equal or better environmental outcomes than full removal and that regulatory approval is obtained where arrangements are satisfactory to the regulator. Expected value approach This approach is used for heritage BHPP assets (excluding those commonly held by both heritage entities). For both onshore and offshore assets, provision has been made taking into consideration a risked range of possible removal outcomes, including full removal of certain assets. Individual site provisions are an estimate of the expected value of future cash \ufb02ows required to rehabilitate the relevant site using current restoration standards and techniques and taking into account risks and uncertainties. Individual site provisions are discounted to their present value using country speci\ufb01c discount rates aligned to the estimated timing of cash out\ufb02ows. Inherent uncertainties The basis of the restoration obligation provision for assets with approved decommissioning plans or general directions issued by the regulator can differ from the assumptions disclosed above. Whilst the provisions re\ufb02ect the Group\u2019s best estimate based on current knowledge and information, further studies and detailed analysis of the restoration activities for individual assets will be performed near the end of their operational life and/or when detailed decommissioning plans are required to be submitted to the relevant regulatory authorities. Actual costs and cash out\ufb02ows can materially differ from the current estimate as a result of changes in regulations and their application, prices, analysis of site conditions, further studies, timing of restoration and changes in removal technology. These uncertainties may result in actual expenditure differing from amounts included in the provision recognised as at 31 December 2022. A range of pre-tax discount rates between 3.4% and 4.7% (2021: 0.4% to 2.4%) has been applied. If the discount rates were decreased by 0.5% then the provision would be $316 million higher. If the cost estimates were increased by 10% then the provision would be $627 million higher. The proportion of the non-current balance not expected to be settled within 10 years is 54% (2021: 65%). (b) Legal case outcomes Provisions for legal cases are measured at the present value of the amount expected to settle the claim. Management is required to use judgement when assessing the likely outcome of legal cases, estimating the risked amount and whether a provision or contingent liability should be recognised. Employee bene\ufb01ts Provision is made for employee bene\ufb01ts accumulated as a result of employees rendering services up to the end of the reporting period. These bene\ufb01ts include wages, salaries, annual leave and long service leave. Liabilities in respect of employees\u2019 services rendered that are not expected to be wholly settled within one year after the end of the period in which the employees render the related services are recognised as long-term employee bene\ufb01ts. These liabilities are measured at the present value of the estimated future cash out\ufb02ow to the employees using the projected unit credit method. Liabilities expected to be wholly settled within one year after the end of the period in which the employees render the related services are classi\ufb01ed as short- term bene\ufb01ts and are measured at the amount due to be paid. Onerous contract provision Provision is made for loss-making contracts at the present value of the lower of the net cost of ful\ufb01lling and the cost arising from failure to ful\ufb01ll each contract. (c) Onerous contracts The onerous contract provision assessment requires management to make certain estimates regarding the unavoidable costs and the expected economic bene\ufb01ts from the contract. These estimates require signi\ufb01cant management judgement and are subject to risk and uncertainty, and hence changes in economic conditions can affect the assumptions. As at 31 December 2022, the Corpus Christi contract is expected to return a positive value and on this basis the provision has been reversed to nil (2021: $214 million). Changes in assumptions predominantly relating to the narrowing of the spread between the sales price and purchase price could result in the contract becoming onerous in the future. Assumptions used to determine the present value as at 31 December 2022 are set out below: \u2022  Remaining contract term \u2013 18 years. \u2022  Discount rate \u2013 a pre-tax, risk free US government bond rate  of 4.10% (2021: 1.855%) has been applied. \u2022  LNG pricing \u2013 forecast sales and purchase prices are subject to a number of price markers. Price assumptions are based on the best information on the market available at measurement date and derived from short- and long-term views of global supply and demand, building upon past experience of the industry and consistent with external sources. The forecasted sales are linked to gas hub prices (Title Transfer Facility (TTF)) at which physical sales are expected to occur and incorporate known sales pricing information . The long-term gas sales price is estimated on the basis of the Group\u2019s Brent price forecast. The estimated purchase price is linked to US gas hub prices (Henry Hub (HH)) at which physical purchases are expected to occur. The nominal TTF, Brent oil prices and HH gas prices used at 31 December 2022 were: 2023 2024 2025 2026 2027 TTF (US$/MMBtu) 47.9 36.4 22.3 8.8 9.0 Brent (US$/bbl) 87 78 74 76 77\u00b2 HH (US$/MMBtu) 6.1 4.7 4.0 4.1 4.23 1.  For committed volumes, contracted pricing has been applied. 2. Long-term oil prices are based on US$70/bbl (2022 real terms) from 2025 and prices are escalated at 2.0% onwards. 3. Long-term gas prices are based on US$3.8/MMBtu (2022 real terms) from 2025. All long-term prices are escalated at 2.0%. Recognition and measurement Other \ufb01nancial assets and liabilities Receivables subject to provisional pricing adjustments are  initially recognised at the transaction price and subsequently  measured at fair value with movements recognised in the  consolidated income statement.  Derivative \ufb01nancial instruments  Derivative \ufb01nancial instruments that are designated within  qualifying hedge relationships are initially recognised at fair  value on the date the contract is entered into. For relationships  designated as fair value hedges, subsequent fair value  movements of the derivative are recognised in the consolidated  income statement.  For relationships designated as cash \ufb02ow hedges, subsequent  fair value movements of the derivative for the effective portion  of the hedge are recognised in other comprehensive income  and accumulated in reserves in equity; fair value movements  for the ineffective portion are recognised immediately in the  consolidated income statement. Costs of hedging have been  separated from the hedging arrangements and deferred to  other comprehensive income and accumulated in reserves in  equity. Amounts accumulated in equity are reclassi\ufb01ed to the  consolidated income statement in the periods when the hedged  item affects pro\ufb01t or loss. Derivative \ufb01nancial instruments  (cont.) Hedge effectiveness is determined at the inception of the hedge  relationship, and through periodic prospective effectiveness  assessments to ensure that an economic relationship exists  between the hedged exposure and the hedging instrument.  The Group assesses whether the derivative designated in each  hedging relationship has been, and is expected to be, effective in  offsetting changes in cash \ufb02ows of the hedged exposure using  the hypothetical derivative method. Ineffectiveness is recognised where the cumulative change in  the designated component value of the hedging instrument on  an absolute basis exceeds the change in value of the hedged  exposure attributable to the hedged risk.  Ineffectiveness may arise where the timing of the transaction  changes from what was originally estimated such as delayed  shipments or changes in timing of forecast sales. This may also  arise where the commodity swap pricing terms do not perfectly  match the pricing terms of the LNG revenue contracts. Fair value Except for the other \ufb01nancial assets and other \ufb01nancial liabilities  set out in this note, there are no material \ufb01nancial assets or  \ufb01nancial liabilities carried at fair value.  The fair value of commodity derivative \ufb01nancial instruments  is determined based on observable quoted forward pricing  and swap models and is classi\ufb01ed as Level 2 on the fair value  hierarchy. The most frequently applied valuation techniques  include forward pricing and swap models that use present value  calculations. The models incorporate various inputs including the  credit quality of counterparties and forward rate curves of the  underlying commodity.  The fair value of interest rate swaps is calculated by discounting  estimated future cash \ufb02ows based on the terms of maturity  of each contract, using market interest rates for a similar  instrument at the reporting date and is classi\ufb01ed as Level 2  on the fair value hierarchy.  The fair value of foreign exchange forward contracts is  determined using quoted forward exchange rates at the  reporting date and present value calculations based on high  credit quality yield curves in the respective currencies and is  classi\ufb01ed as Level 2 on the fair value hierarchy. The fair values of other \ufb01nancial assets and other \ufb01nancial  liabilities are predominantly determined based on observable  quoted forward pricing and are predominantly classi\ufb01ed as  Level 2 on the fair value hierarchy. Key estimates and judgements Fair value of other \ufb01nancial assets and liabilities Estimates have been applied in the measurement of other \ufb01nancial  assets and liabilities and, where required, judgement is applied in  the settlement of any \ufb01nancial assets or liabilities. In the current  period, this included a $3 million periodic adjustment relating to  timing which increased other \ufb01nancial liabilities, re\ufb02ecting the  arrangements governing Wheatstone LNG sales (2021: $56 million  increase). Recognition and measurement When a contract is entered into, the Group assesses whether  the contract contains a lease. A lease arises when the Group  has the right to direct the use of an identi\ufb01ed asset which is not  substitutable and to obtain substantially all economic bene\ufb01ts  from the use of the asset throughout the period of use. The  leases recognised by the Group predominantly relate to LNG  vessels, property and drilling rigs. The Group separates the lease and non-lease components of the  contract and accounts for these separately. The Group allocates  the consideration in the contract to each component on the  basis of their relative stand-alone prices. Leases as a lessee Lease assets and lease liabilities are recognised at the lease  commencement date, which is when the assets are available  for use. The assets are initially measured at cost, which is the  present value of future lease payments adjusted for any lease  payments made at or before the commencement date, plus any  make-good obligations and initial direct costs incurred. Lease assets are depreciated using the straight-line method over  the shorter of their useful life and the lease term. Refer to Note  B.3 for the useful lives of assets. Periodic adjustments are made  for any re-measurements of the lease assets and for impairment  losses, assessed in accordance with the Group\u2019s impairment  policies.  Lease liabilities are initially measured at the present value of  future minimum lease payments, discounted using the Group\u2019s  incremental borrowing rate if the rate implicit in the lease cannot  be readily determined, and are subsequently measured at  amortised cost using the effective interest rate. Minimum lease  payments are \ufb01xed payments or index-based variable payments  incorporating the Group\u2019s expectations of extension options and  do not include non-lease components of a contract. A portfolio  approach was taken when determining the implicit discount rate  for LNG vessels with similar terms and conditions on transition. The lease liability is remeasured when there are changes in  future lease payments arising from a change in rates, index or  lease terms from exercising an extension or termination option.  A corresponding adjustment is made to the carrying amount of  the lease assets, with any excess recognised in the consolidated  income statement. There are no restrictions placed upon the lessee by entering into  these leases. Short-term leases and leases of low value  Short-term leases (lease term of 12 months or less) and leases  of low value assets are recognised as incurred as an expense in  the consolidated income statement. Low value assets comprise  plant and equipment.  Foreign exchange risk The Group held $441 million of lease liabilities at 31 December  2022 (2021: $476 million) in currencies other than the US dollar  (predominantly Australian dollars). Key estimates and judgements (a) Control Judgement is required to assess whether a contract is or contains a  lease at inception by assessing whether the Group has the right to  direct the use of the identi\ufb01ed asset and obtain substantially all the  economic bene\ufb01ts from the use of that asset. (b) Lease term Judgement is required when assessing the term of the lease and  whether to include optional extension and termination periods.  Option periods are only included in determining the lease term  at inception when they are reasonably certain to be exercised.  Lease terms are reassessed when a signi\ufb01cant change in  circumstances occurs. On this basis, possible additional lease  payments amounting to $2,323 million (2021: $1,654 million)  were not included in the measurement of lease liabilities. (c) lnterest in joint arrangements  Judgement is required to determine the Group\u2019s rights and  obligations for lease contracts within joint operations, to assess  whether lease liabilities are recognised gross (100%) or in proportion  to the Group\u2019s participating interest in the joint operation. This  includes an evaluation of whether the lease arrangement contains  a sublease with the joint operation. (d) Discount rates Judgement is required to determine the discount rate, where the  discount rate is the Group\u2019s incremental borrowing rate if the rate  implicit in the lease cannot be readily determined. The incremental  borrowing rate is determined with reference to the Group\u2019s  borrowing portfolio at the inception of the arrangement or  the time of the modi\ufb01cation. Contingent liabilities relate predominantly to possible obligations whose existence will only be con\ufb01rmed by the occurrence or non-occurrence of uncertain future events, and therefore the Group has not provided for such amounts in these \ufb01nancial statements. Additionally, there are a number of other claims and possible claims that have arisen in the course of business against entities in the Group, the outcome of which cannot be estimated at present and for which no amounts have been included in the table above. The Group has contingent assets of $199 million as at 31 December 2022 (2021: nil). Recognition and measurement The Group\u2019s accounting policy for employee bene\ufb01ts other than superannuation is set out in Note D.5. The policy relating to share-based payments is set out in Note E.2(c). All employees of the Group are entitled to bene\ufb01ts on retirement, disability or death from the Group\u2019s retirement plans. The Group operates a number of pension schemes throughout the world. Employees entitled to de\ufb01ned contribution schemes receive \ufb01xed contributions from Group companies and the Group\u2019s legal or constructive obligation is limited to these contributions. Contributions to de\ufb01ned contribution funds are recognised as an expense as they become payable. Prepaid contributions are recognised as an asset to the extent that a cash refund or a reduction in the future payment is available. Recognition and measurement  All compensation under WEP, SWEP and Executive share plans  is accounted for as share-based payments to employees for  services provided. The cost of equity-settled transactions with  employees is measured by reference to the fair values of the  equity instruments at the date at which they are granted. The  fair value of share-based payments is recognised, together with  the corresponding increase in equity, over the period in which  the vesting conditions are ful\ufb01lled, ending on the date on which  the relevant employee becomes fully entitled to the shares. At  each balance sheet date, the Group reassesses the number of  awards that are expected to vest based on service conditions.  The expense recognised each year takes into account the most  recent estimate.  The fair value of the bene\ufb01t provided for the WEP and SWEP is  estimated using the Black-Scholes option pricing technique.  The fair value of the restricted shares is estimated as the  closing share price at grant date. The fair value of the bene\ufb01t  provided for the RTSR PRs is calculated using the Binomial or  Black-Scholes option pricing technique combined with a Monte  Carlo simulation methodology, where relevant, using historical  volatility to estimate the volatility of the share price in the future. Key estimates and judgements  Accounting for interests in other entities  Judgement is required in assessing the level of control obtained in a  transaction to acquire an interest in another entity; depending upon  the facts and circumstances in each case, Woodside may obtain  control, joint control or signi\ufb01cant in\ufb02uence over the entity or  arrangement. Judgement is applied when determining the relevant  activities of a project and if joint control is held over it.  Relevant activities include, but are not limited to, work program  and budget approval, investment decision approval, voting rights in  joint operating committees, amendments to permits and changes  to joint arrangement participant holdings. Transactions which  give Woodside control of a business are business combinations.  If Woodside obtains joint control of an arrangement, judgement  is also required to assess whether the arrangement is a joint  operation or a joint venture. If Woodside has neither control nor  joint control, it may be in a position to exercise signi\ufb01cant in\ufb02uence  over the entity, which is then accounted for as an associate. Recognition and measurement  Joint arrangements are arrangements in which two or more  parties have joint control. Joint control is the contractual agreed  sharing of control of the arrangement which exists only when  decisions about the relevant activities require unanimous  consent of the parties sharing control. Joint arrangements are  classi\ufb01ed as either a joint operation or joint venture, based  on the rights and obligations arising from the contractual  obligations between the parties to the arrangement.  To the extent the joint arrangement provides the Group with  rights to the individual assets and obligations arising from  the joint arrangement, the arrangement is classi\ufb01ed as a joint  operation, and as such the Group recognises its: \u2022  assets, including its share of any assets held jointly;  \u2022  liabilities, including its share of any liabilities incurred jointly;  \u2022  revenue from the sale of its share of the output arising from  the joint operation;  \u2022  share of revenue from the sale of the output by the joint  operation; and  \u2022  expenses, including its share of any expenses incurred jointly.  To the extent the joint arrangement provides the Group with  rights to the net assets of the arrangement, the investment  is classi\ufb01ed as a joint venture and accounted for using the  equity method. Joint arrangements acquired which are deemed to be carrying  on a business are accounted for applying the principles of  AASB 3/ IFRS 3 Business Combinations. Joint arrangements  which are not deemed to be carrying on a business are treated  as asset acquisitions.E.9  Other accounting policies (a) Summary of other signi\ufb01cant accounting  policies  Australia tax consolidation  The parent and its wholly owned Australian controlled entities  have elected to enter a tax consolidation, with Woodside Energy  Group Ltd as the head entity of the tax consolidated group.  The members of the Australian tax consolidated group are  identi\ufb01ed in Note E.8(a).  The tax expense/bene\ufb01t, deferred tax liabilities and deferred tax  assets arising from temporary differences of the members of the  tax consolidated group are recognised in the separate \ufb01nancial  statements of the members of the tax consolidated group, using  the stand-alone approach.  Entities within the tax consolidated group have entered into a  tax funding arrangement and a tax sharing agreement with the  head entity. Under the tax funding agreement, Woodside Energy  Group Ltd and each of the entities in the tax consolidated group  have agreed to pay or receive a tax equivalent payment to or  from the head entity, based on the current tax liability or current  tax asset of the entity.  The tax sharing agreement entered into between members  of the tax consolidated group provides for the determination  of the allocation of income tax liabilities between the entities,  should the head entity default on its tax payment obligations.  No amounts have been recognised in the \ufb01nancial statements in  respect of this agreement as payment of any amounts under the  tax sharing agreement is considered remote.  US tax consolidation Woodside Energy USA Operations Inc and its wholly owned  USA controlled entities have elected to \ufb01le a consolidated tax  return, with Woodside Energy USA Operations Inc as the parent  of the tax consolidated group.  The tax expense/bene\ufb01t, deferred tax liabilities and deferred tax  assets arising from temporary differences of the members of the  tax consolidated group are computed on a separate company  basis. Entities within the tax consolidated group have entered into a  tax sharing agreement. Under the tax sharing agreement, the  tax liability for the consolidated group or the utilisation of tax  attributes are settled periodically between the members of  the group. No amounts have been recognised in the \ufb01nancial  statements in respect of this agreement as payment of any  amounts under the tax sharing agreement is considered remote.   (b) New and amended accounting standards and  interpretations issued but not yet effective A number of new standards, amendments of standards and  interpretations have recently been issued but are not yet  effective and have not been adopted by the Group as at the  \ufb01nancial reporting date. The Group has reviewed these standards and interpretations  and has determined that none of the new or amended standards  will signi\ufb01cantly affect the Group\u2019s accounting policies, \ufb01nancial  position or performance. (c) New and amended accounting standards and  interpretations adopted As of 1 January 2022, the Group adopted AASB 2020-3  Amendments to AASs \u2013 Annual Improvements 2018-2020 and  Other Amendments including:  \u2022  Amendments to AASB 3 Reference to the Conceptual  Framework  \u2022  Amendments to AASB 9 Fees in the \u201810 per cent\u2019 Test for  Derecognition of Financial Liabilities  \u2022  Amendments to AASB 137 Onerous Contracts \u2013 Costs of  Ful\ufb01lling a Contract  These amendments did not impact the \ufb01nancial statements  of the Group.  A number of other new standards are also effective from  1 January 2022 but they do not have a material effect on the  Group\u2019s \ufb01nancial statements. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSummaryOfSignificantAccountingPoliciesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-750": {
   "value": "About these statements<span class=\"_ _2e9\"> </span>Following the approval by shareholders at the Annual General<span class=\"_ _2e9\"> </span>Meeting on 19 May 2022, Woodside Petroleum Ltd has<span class=\"_ _2e9\"> </span>registered the change of company name to Woodside Energy<span class=\"_ _2e9\"> </span>Group Ltd. Woodside Energy Group Ltd and its controlled<span class=\"_ _2e9\"> </span>entities (Woodside or the Group) is a for-pro\ufb01t entity limited<span class=\"_ _2e9\"> </span>by shares, incorporated and domiciled in Australia. Its shares<span class=\"_ _2e9\"> </span>are publicly traded on the Australian Securities Exchange<span class=\"_ _2e9\"> </span>(ASX), on the Main Market for listed securities of the London<span class=\"_ _2e9\"> </span>Stock Exchange (LSE) (with trades settled in the form of UK<span class=\"_ _2e9\"> </span>Depository Interests) and on the New York Stock Exchange<span class=\"_ _2e9\"> </span>(NYSE) (in the form of Woodside American Depositary Shares).<span class=\"_ _2e9\"> </span>The nature of the operations and the principal activities of the<span class=\"_ _2e9\"> </span>Group are described in the Directors\u2019 Report and in the segment<span class=\"_ _2e9\"> </span>information in Note A.1.<span class=\"_ _2e9\"> </span>The \ufb01nancial statements were authorised for issue in accordance<span class=\"_ _2e9\"> </span>with a resolution of the Directors on 27 February 2023.<span class=\"_ _2e9\"> </span>Statement of compliance<span class=\"_ _2e9\"> </span>The \ufb01nancial statements are general purpose \ufb01nancial<span class=\"_ _2e9\"> </span>statements, which have been prepared in accordance with<span class=\"_ _2e9\"> </span>the requirements of the <span class=\"ff23\">Corporations Act 2001</span>, Australian<span class=\"_ _2e9\"> </span>Accounting Standards and other authoritative pronouncements<span class=\"_ _2e9\"> </span>of the Australian Accounting Standards Board (AASB). The<span class=\"_ _2e9\"> </span>\ufb01nancial statements comply with the International Financial<span class=\"_ _2e9\"> </span>Reporting Standards (IFRS) as issued by the International<span class=\"_ _2e9\"> </span>Accounting Standards Board. They also include additional<span class=\"_ _2e9\"> </span>disclosures required for foreign registrants by the United States<span class=\"_ _2e9\"> </span>Securities and Exchange Commission (US SEC).<span class=\"_ _2e9\"> </span>Subsequent to the merger with BHPP, BHPP\u2019s accounting<span class=\"_ _2e9\"> </span>policies have been aligned with the Group. The Group\u2019s<span class=\"_ _2e9\"> </span>accounting policies are consistent with those disclosed in the<span class=\"_ _2e9\"> </span>Group\u2019s 2021 Financial Statements except for new policies<span class=\"_ _2e9\"> </span>applicable in 2022. Adoption of new or amended standards and<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">interpretations effective 1 January 2022 did not result in any<span class=\"_ _2e9\"> </span></span>signi\ufb01cant changes to the Group\u2019s accounting policies.<span class=\"_ _2e9\"> </span>Estimates have been revised, where required, to re\ufb02ect current<span class=\"_ _2e9\"> </span>market conditions including the impact of COVID-19 and<span class=\"_ _2e9\"> </span>climate change. Updated assumptions used for impairment<span class=\"_ _2e9\"> </span>assessments and the measurement of onerous contracts are<span class=\"_ _2e9\"> </span>disclosed in Notes B.4 and D.5 respectively; these assumptions<span class=\"_ _2e9\"> </span>could change in the future. New estimates and judgements<span class=\"_ _2e9\"> </span>for signi\ufb01cant transactions during the period including the<span class=\"_ _2e9\"> </span>recognition of goodwill as a result of the business combination,<span class=\"_ _2e9\"> </span>the allocation of goodwill to the Group\u2019s cash generating units,<span class=\"_ _2e9\"> </span>and the sell-down of Train 2 are disclosed in Notes B.5, B.4 and<span class=\"_ _2e9\"> </span>B.7 respectively.<span class=\"_ _2e9\"> </span>Currency<span class=\"_ _2e9\"> </span>The functional and presentation currency of Woodside and all its<span class=\"_ _2e9\"> </span>material subsidiaries is the US dollar.<span class=\"_ _2e9\"> </span>Transactions in foreign currencies are initially recorded in the<span class=\"_ _2e9\"> </span>functional currency of the transacting entity at the exchange<span class=\"_ _2e9\"> </span>rates ruling at the date of transaction. Monetary assets and<span class=\"_ _2e9\"> </span>liabilities denominated in foreign currencies at the reporting<span class=\"_ _2e9\"> </span>date are translated at the rates of exchange ruling at that date.<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">Exchange differences in the consolidated \ufb01nancial statements<span class=\"_ _2e9\"> </span></span>are taken to the income statement.<span class=\"_ _2e9\"> </span>Rounding of amounts<span class=\"_ _2e9\"> </span>The amounts contained in these \ufb01nancial statements have been<span class=\"_ _2e9\"> </span>rounded to the nearest million dollars under the option available<span class=\"_ _2e9\"> </span>to the Group under Australian Securities and Investments<span class=\"_ _2e9\"> </span>Commission (ASIC) Corporations (Rounding in Financial/<span class=\"_ _2e9\"> </span>Directors\u2019 Reports) Instrument 2016/191 dated 24 March 2016,<span class=\"_ _2e9\"> </span>unless otherwise stated.<span class=\"_ _2e9\"> </span>Basis of preparation<span class=\"_ _2e9\"> </span>The \ufb01nancial statements have been prepared on a historical cost<span class=\"_ _2e9\"> </span>basis, except for derivative \ufb01nancial instruments and certain<span class=\"_ _2e9\"> </span>other \ufb01nancial assets and \ufb01nancial liabilities, which have been<span class=\"_ _2e9\"> </span>measured at fair value or amortised cost adjusted for changes<span class=\"_ _2e9\"> </span>in fair value attributable to the risks that are being hedged in<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">effective hedge relationships. Where not carried at fair value, if<span class=\"_ _2e9\"> </span></span>the carrying value of \ufb01nancial assets and \ufb01nancial liabilities does<span class=\"_ _2e9\"> </span>not approximate their fair value, the fair value has been included<span class=\"_ _2e9\"> </span>in the notes to the \ufb01nancial statements.<span class=\"_ _2e9\"> </span>The \ufb01nancial statements comprise the \ufb01nancial position and<span class=\"_ _2e9\"> </span>results of the Group as at and for the year ended 31 December<span class=\"_ _2e9\"> </span>2022 (refer to Note E.8).<span class=\"_ _2e9\"> </span>Subsidiaries are fully consolidated from the date on which<span class=\"_ _2e9\"> </span>control is obtained by the Group and cease to be consolidated<span class=\"_ _2e9\"> </span>from the date at which the Group ceases to have control.<span class=\"_ _2e9\"> </span>The subsidiaries of the Group apply the same reporting period<span class=\"_ _2e9\"> </span>and accounting policies as the parent company in their \ufb01nancial<span class=\"_ _2e9\"> </span>statements. All intercompany balances and transactions,<span class=\"_ _2e9\"> </span>including unrealised pro\ufb01ts and losses arising from intra-group<span class=\"_ _2e9\"> </span>transactions, have been eliminated in full.<span class=\"_ _2e9\"> </span>Non-controlling interests are allocated their share of the net<span class=\"_ _2e9\"> </span>pro\ufb01t after tax in the consolidated income statement and<span class=\"_ _2e9\"> </span>their share of other comprehensive income net of tax in the<span class=\"_ _2e9\"> </span>consolidated statement of comprehensive income, and are<span class=\"_ _2e9\"> </span>presented within equity in the consolidated statement of<span class=\"_ _2e9\"> </span>\ufb01nancial position, separately from parent shareholders\u2019 equity.<span class=\"_ _2e9\"> </span>The consolidated \ufb01nancial statements provide comparative<span class=\"_ _2e9\"> </span>information in respect of the previous periods. Where required,<span class=\"_ _2e9\"> </span>a reclassi\ufb01cation of items in the \ufb01nancial statements of the<span class=\"_ _2e9\"> </span>previous periods has been made in accordance with the<span class=\"_ _2e9\"> </span>classi\ufb01cation of items in the \ufb01nancial statements of the current period.<span class=\"_ _2e9\"> </span>Climate change and energy transition<span class=\"_ _2e9\"> </span>Climate considerations<span class=\"_ _2e9\"> </span>Woodside has considered the impact of climate and the energy<span class=\"_ _2e9\"> </span>transition in assessing the carrying value of its assets and<span class=\"_ _2e9\"> </span>liabilities. This note describes climate-related assumptions that<span class=\"_ _2e9\"> </span>underpin key areas of the \ufb01nancial statements and the potential<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">short- and long-term impacts differing scenarios could have on<span class=\"_ _2e9\"> </span></span>the \ufb01nancial results and \ufb01nancial position of Woodside.<span class=\"_ _2e9\"> </span>Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements<span class=\"_ _2e9\"> </span>for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span>Climate change and energy transition (cont.)<span class=\"_ _2e9\"> </span>Financial planning and assumptions<span class=\"_ _2e9\"> </span>Woodside considers a range of climate and macroeconomic<span class=\"_ _2e9\"> </span> scenarios to help benchmark our long-term price assumptions<span class=\"_ _2e9\"> </span> and inform our decision making to ensure we maintain a resilient<span class=\"_ _2e9\"> </span> \ufb01nancial position. The assumptions applied in assessing amounts<span class=\"_ _2e9\"> </span> within the \ufb01nancial statements are in each case calculated in<span class=\"_ _2e9\"> </span> accordance with the requirements of the applicable accounting<span class=\"_ _2e9\"> </span> standards.<span class=\"_ _2e9\"> </span> Our long-term price assumptions re\ufb02ect management\u2019s current<span class=\"_ _2e9\"> </span> \u2018best estimate\u2019 scenario in which global governments pursue<span class=\"_ _2e9\"> </span> decarbonisation as well as other goals such as energy security<span class=\"_ _2e9\"> </span> and economic development. All price assumptions consider<span class=\"_ _2e9\"> </span> current legislation in the locations where Woodside operates<span class=\"_ _2e9\"> </span> and place some weight on scenarios in which the transition to<span class=\"_ _2e9\"> </span> <span class=\"_ _2e9\">a low carbon energy system is sufficiently rapid to meet the<span class=\"_ _2e9\"> </span></span> goals of the Paris Agreement, as well as scenarios in which the<span class=\"_ _2e9\"> </span> <span class=\"_ _2e9\">transition is not, or may not be, sufficiently rapid. They also place<span class=\"_ _2e9\"> </span></span> some weight on a range of other assumptions which can drive<span class=\"_ _2e9\"> </span> prices (e.g. in\ufb02ation) and which are not related to the Paris goals.<span class=\"_ _2e9\"> </span>Woodside\u2019s facilities are subject to physical risks such as oceanic<span class=\"_ _2e9\"> </span> conditions and are located in regions that experience tropical<span class=\"_ _2e9\"> </span> cyclones, hurricanes and high ambient temperatures. Woodside<span class=\"_ _2e9\"> </span> has signi\ufb01cant experience designing and operating facilities<span class=\"_ _2e9\"> </span> located in harsh environments.<span class=\"_ _2e9\"> </span>Woodside notes that the high degree of uncertainty around the<span class=\"_ _2e9\"> </span> nature, timing and magnitude of climate-related risks, and the<span class=\"_ _2e9\"> </span> uncertainty as to how the energy transition will evolve, makes it<span class=\"_ _2e9\"> </span> <span class=\"_ _2e9\">difficult to determine and disclose the risks and their potential<span class=\"_ _2e9\"> </span></span> impacts with precision.<span class=\"_ _2e9\"> </span> Woodside continues to monitor the uncertainty around climate<span class=\"_ _2e9\"> </span> change risks and will revise commodity and carbon pricing<span class=\"_ _2e9\"> </span> assumptions accordingly. Oil and gas investment cases include<span class=\"_ _2e9\"> </span> a carbon price assumption which takes into consideration<span class=\"_ _2e9\"> </span> uncertainty around the impact of climate change. Commodity<span class=\"_ _2e9\"> </span> pricing assumptions are key value drivers with greater<span class=\"_ _2e9\"> </span> signi\ufb01cance to assets and liabilities than carbon pricing.<span class=\"_ _2e9\"> </span>Impairment of exploration and evaluation, oil and gas<span class=\"_ _2e9\"> </span> properties and goodwill<span class=\"_ _2e9\"> </span>In accordance with IFRS, elements of Woodside\u2019s \ufb01nancial<span class=\"_ _2e9\"> </span> statements are based on reasonable and supportable<span class=\"_ _2e9\"> </span> assumptions that represent management\u2019s current best estimate<span class=\"_ _2e9\"> </span> of the range of economic conditions that may exist in the<span class=\"_ _2e9\"> </span> foreseeable future.<span class=\"_ _2e9\"> </span>The estimation of recoverable amounts for impairment testing<span class=\"_ _2e9\"> </span> includes estimating what an independent market participant<span class=\"_ _2e9\"> </span> would pay to acquire the asset as at the reporting date. Market<span class=\"_ _2e9\"> </span> participants will be guided by their own views on future<span class=\"_ _2e9\"> </span> economic and technical conditions and therefore Woodside<span class=\"_ _2e9\"> </span> considers a range of data sources in determining a future price<span class=\"_ _2e9\"> </span> forecast, including industry and market benchmarks along with<span class=\"_ _2e9\"> </span> asset sales transaction data.<span class=\"_ _2e9\"> </span> Price forecasts are adjusted for premiums and discounts<span class=\"_ _2e9\"> </span> based on the nature and quality of the product. Brent oil price<span class=\"_ _2e9\"> </span> estimates have considered the impacts of climate policies along<span class=\"_ _2e9\"> </span> with other factors such as industry investment and cost trends.<span class=\"_ _2e9\"> </span> There remains signi\ufb01cant uncertainty around how society will<span class=\"_ _2e9\"> </span> respond to the climate challenge.<span class=\"_ _2e9\"> </span> The energy transition is expected to bring volatility and there is<span class=\"_ _2e9\"> </span> uncertainty as to how commodity prices will develop over the<span class=\"_ _2e9\"> </span> medium and long term. The IEA\u2019s World Energy Outlook 2022<span class=\"_ _2e9\"> </span> (WEO) explores three main climate change scenarios. The IEA<span class=\"_ _2e9\"> </span> scenarios are not predictions and the IEA does not have a single<span class=\"_ _2e9\"> </span> view on the future of the energy system. There is signi\ufb01cant<span class=\"_ _2e9\"> </span> uncertainty as to whether any of these scenarios will eventuate.<span class=\"_ _2e9\"> </span> Because Woodside considers what a market participant would<span class=\"_ _2e9\"> </span> pay to acquire an asset in assessing impairments, these external<span class=\"_ _2e9\"> </span> scenarios are not necessarily consistent with the pricing<span class=\"_ _2e9\"> </span> assumptions used for the Group\u2019s impairment assessment<span class=\"_ _2e9\"> </span> as disclosed in Table A below and Note B.4 Impairment of<span class=\"_ _2e9\"> </span> exploration and evaluation, oil and gas properties and goodwill.<span class=\"_ _2e9\"> </span> <span class=\"_ _2e9\">The WEO explores three main scenarios1:<span class=\"_ _2e9\"> </span></span>\u2022 <span class=\"_ _4b\"> </span>The Net Zero Emissions by 2050 Scenario (NZE)<span class=\"_ _2e9\"> </span> \u2022 <span class=\"_ _4b\"> </span>The Announced Pledges Scenario (APS)<span class=\"_ _2e9\"> </span> \u2022 <span class=\"_ _4b\"> </span>The Stated Policies Scenario (STEPS)<span class=\"_ _2e9\"> </span> <span class=\"_ _2e9\">Table A: Average real terms 2022 oil price (US$/bbl, Brent)2,<span class=\"_ _2e9\"> </span></span> <span class=\"_ _2e9\">North Asian LNG price (US$/MMbtu)2 and carbon price </span> <span class=\"_ _2e9\">(US$/tCO\u2082-e)3 consistent with IEA dataset compared against<span class=\"_ _2e9\"> </span></span> Woodside\u2019s assumptions:<span class=\"_ _2e9\"> </span>A<span class=\"_ _1\"/>ver<span class=\"_ _1\"/>age Br<span class=\"_ _1\"/>ent  (RT US$/bbl)<span class=\"_ _bc\"> </span>2023-2026<span class=\"_ _53\"> </span>2027<span class=\"_ _1\"/>-2031<span class=\"_ _51\"> </span>2032<span class=\"_ _1\"/>-2036<span class=\"_ _52\"> </span>2037<span class=\"_ _1\"/>-2040<span class=\"_ _2e9\"> </span>NZE<span class=\"_ _20f\"> </span><span class=\"ls6a ws83\">59<span class=\"_ _a8\"> </span></span>38<span class=\"_ _a8\"> </span>33<span class=\"_ _9e\"> </span>31<span class=\"_ _2e9\"> </span>APS<span class=\"_ _20f\"> </span>88<span class=\"_ _210\"> </span><span class=\"ls72 ws8b\">70<span class=\"_ _210\"> </span><span class=\"ls6c ws85\">65<span class=\"_ _210\"> </span>65<span class=\"_ _2e9\"> </span></span></span>STEPS<span class=\"_ _46\"> </span><span class=\"ls75 ws8f\">92<span class=\"_ _163\"> </span></span>85<span class=\"_ _a8\"> </span>85<span class=\"_ _163\"> </span>88<span class=\"_ _2e9\"> </span>W<span class=\"_ _1\"/>oodside<span class=\"_ _c9\"> </span><span class=\"ls72 ws8b\">75<span class=\"_ _210\"> </span>70<span class=\"_ _210\"> </span>70<span class=\"_ _210\"> </span>70<span class=\"_ _2e9\"> </span></span>A<span class=\"_ _1\"/>ver<span class=\"_ _1\"/>age North Asian<span class=\"_ _2e9\"> </span> LNG (RT US$/MMbtu)<span class=\"_ _22\"> </span><span class=\"ws0\">2023-2026<span class=\"_ _53\"> </span>2027<span class=\"_ _1\"/>-20<span class=\"_ _1\"/>31<span class=\"_ _51\"> </span>2032-2036<span class=\"_ _41\"> </span>2037<span class=\"_ _1\"/>-2040<span class=\"_ _2e9\"> </span></span>NZE<span class=\"_ _14\"> </span>18<span class=\"_ _142\"> </span>6<span class=\"_ _13f\"> </span>6<span class=\"_ _13f\"> </span>6<span class=\"_ _2e9\"> </span>APS<span class=\"_ _30\"> </span>20<span class=\"_ _142\"> </span>9<span class=\"_ _13f\"> </span>9<span class=\"_ _13f\"> </span>9<span class=\"_ _2e9\"> </span>STEPS<span class=\"_ _118\"> </span>21<span class=\"_ _13f\"> </span>11<span class=\"_ _ae\"> </span>11<span class=\"_ _13f\"> </span>11<span class=\"_ _2e9\"> </span>W<span class=\"_ _1\"/>oodside<span class=\"_ _c9\"> </span>23<span class=\"_ _13f\"> </span>9<span class=\"_ _13f\"> </span>9<span class=\"_ _13f\"> </span>9<span class=\"_ _2e9\"> </span>A<span class=\"_ _1\"/>ver<span class=\"_ _1\"/>age Carbon<span class=\"_ _2e9\"> </span> (RT US$/t<span class=\"_ _1\"/>onne)<span class=\"_ _f4\"> </span>2023-20<span class=\"_ _1\"/>26<span class=\"_ _53\"> </span>2027<span class=\"_ _1\"/>-2031<span class=\"_ _51\"> </span>2032-20<span class=\"_ _1\"/>36<span class=\"_ _52\"> </span>2037<span class=\"_ _1\"/>-2040<span class=\"_ _2e9\"> </span>NZE<span class=\"_ _19f\"> </span>100<span class=\"_ _17a\"> </span><span class=\"ls6a ws83\">1<span class=\"_ _4f\"/>35<span class=\"_ _bc\"> </span><span class=\"ls47 ws82\">169<span class=\"_ _bc\"> </span></span></span>199<span class=\"_ _2e9\"> </span>APS<span class=\"_ _20f\"> </span>98<span class=\"_ _bc\"> </span>130<span class=\"_ _bc\"> </span>154<span class=\"_ _5\"> </span><span class=\"ls6e ws87\">1<span class=\"_ _4f\"/>72<span class=\"_ _2e9\"> </span></span>STEPS<span class=\"_ _eb\"> </span>80<span class=\"_ _163\"> </span>80<span class=\"_ _103\"> </span>80<span class=\"_ _103\"> </span>80<span class=\"_ _2e9\"> </span>W<span class=\"_ _1\"/>oodside<span class=\"_ _cc\"> </span>80<span class=\"_ _103\"> </span>80<span class=\"_ _103\"> </span>80<span class=\"_ _163\"> </span>80<span class=\"_ _2e9\"> </span>1. <span class=\"_ _29\"> </span>IEA 2022. \u2018W<span class=\"_ _1\"/>orld Ener<span class=\"_ _1\"/>gy Outlook 2022\u2019. All rights reserv<span class=\"_ _1\"/>ed.<span class=\"_ _2e9\"> </span>2.  Based on data from IEA 2022. \u2018W<span class=\"_ _1\"/>orld Ener<span class=\"_ _1\"/>gy Outlook 2022\u2019 as modi\ufb01ed by<span class=\"_ _2e9\"> </span> W<span class=\"_ _1\"/>oodside analysis. W<span class=\"_ _0\"/>oodside used interpolation techniques to estimat<span class=\"_ _1\"/>e Brent<span class=\"_ _2e9\"> </span> annual price points in betw<span class=\"_ _1\"/>een the years f<span class=\"_ _1\"/>or which the IEA disclosed price points.<span class=\"_ _2e9\"> </span> For gas pricing assumptions all non-contr<span class=\"_ _1\"/>acted LNG v<span class=\"_ _1\"/>olumes wer<span class=\"_ _1\"/>e assessed at<span class=\"_ _2e9\"> </span> IEA<span class=\"_ _1\"/>\u2019<span class=\"_ _1\"/>s Japan import price, as a pr<span class=\"_ _1\"/>ox<span class=\"_ _1\"/>y for North Asian LNG spot price. W<span class=\"_ _0\"/>oodside<span class=\"_ _2e9\"> </span> used interpolation techniques t<span class=\"_ _1\"/>o estimate annual gas pric<span class=\"_ _1\"/>e points in between the<span class=\"_ _2e9\"> </span> years f<span class=\"_ _1\"/>or which the IEA disclosed prices. For oil link<span class=\"_ _1\"/>ed LNG contrac<span class=\"_ _1\"/>ts, prices are<span class=\"_ _2e9\"> </span> derived fr<span class=\"_ _1\"/>om the Brent f<span class=\"_ _1\"/>orecasts and the t<span class=\"_ _1\"/>erms of the contracts.<span class=\"_ _2e9\"> </span>3.  Based on data from IEA 2022. \u2018W<span class=\"_ _1\"/>orld Ener<span class=\"_ _1\"/>gy Outlook 2022\u2019 as modi\ufb01ed by<span class=\"_ _2e9\"> </span> W<span class=\"_ _1\"/>oodside analysis. The IEA only pr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>vide carbon prices from 20<span class=\"_ _1\"/>30 onwar<span class=\"_ _1\"/>ds. As a<span class=\"_ _2e9\"> </span> result, W<span class=\"_ _0\"/>oodside used a starting point of US$80/tC<span class=\"_ _1\"/><span class=\"_ _2e9\">O\u2082-e consistent with int</span><span class=\"_ _1\"/>ernal<span class=\"_ _2e9\"> </span> carbon cost pricing. W<span class=\"_ _0\"/>oodside used the 2022 starting price point and the IEA<span class=\"_ _1\"/>\u2019<span class=\"_ _1\"/>s<span class=\"_ _2e9\"> </span> published 2030 and 2040 carbon prices for each sc<span class=\"_ _1\"/>enario to interpolat<span class=\"_ _1\"/>e annual<span class=\"_ _2e9\"> </span> price points thr<span class=\"_ _1\"/>ough to 2040.<span class=\"_ _2e9\"> </span>Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements<span class=\"_ _2e9\"> </span>for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls76 ws91\" style=\"left:651.3286px; bottom:1.4145012px;\">107<span class=\"_ _211\"/><span class=\"ff1e fc5 ls0 ws0\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:928.0095px;\">Climate change and energy transition (cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:907.42456px;\">Impairment of exploration and evaluation, oil and gas<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:890.5297px;\">properties and goodwill (cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:874.92456px;\">Refer to Note B.4 for the sensitivity analysis performed on<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:859.3284px;\">Woodside\u2019s Brent oil pricing assumptions and the potential<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:843.73236px;\">impact on the carrying value of Woodside\u2019s non-current assets.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:820.76526px;\">The benchmarked pricing above has limitations and is based<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:805.1691px;\">on a wide range of assumptions. The impact of the benchmark<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:789.57306px;\">pricing assumptions could be managed by decisions Woodside<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:773.9769px;\">could make in response such as acquisitions, divestments or cost<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:758.38086px;\">reductions as well as other consequential changes. The scenarios<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:742.7847px;\">must therefore not be interpreted as Woodside\u2019s investment<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:727.18866px;\">guidance. These are scenarios, not forecasts, and no likelihood is<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:711.5925px;\">assigned to any of these scenarios eventuating.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:683.59937px;\">Impact on remaining life of assets<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:667.9994px;\">Oil and gas properties relating to transferred exploration and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:652.40326px;\"><span class=\"_ _2e9\">evaluation and offshore plant and equipment are depreciated<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:636.8072px;\">using the unit of production basis over either proved or proved<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:621.21106px;\">plus probable reserves. The energy transition may result in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:605.615px;\">changes to the expected useful life of oil and gas properties<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:590.01886px;\">and economically recoverable reserves and resources thereby<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:574.4228px;\">accelerating depreciation charges or resulting in an impairment.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:546.44434px;\">Restoration and other provisions<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:530.8443px;\">The energy transition may result in restoration activities<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:515.2482px;\">occurring earlier than expected. 54% (2021: 65%) of the Group\u2019s<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:499.6521px;\">non-current restoration liabilities are expected to be settled<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:484.05603px;\">more than 10 years in the future.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:461.0889px;\">Restoration cost estimates require judgemental assumptions<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:445.4928px;\">regarding removal date, environmental legislation and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:429.8967px;\">regulations and the extent of restoration activities required.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:908.7426px;\">These cost estimates may change in the future, as a result<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:893.1465px;\">of increased regulatory scrutiny and the energy transition.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:877.5504px;\">Woodside continues to monitor the uncertainty around climate<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:861.9543px;\">change risks to assess if additional changes to restoration<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:846.3582px;\">provisions should be recognised.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:818.3693px;\">Onerous contracts<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:802.76935px;\">Closure or early termination of activities may lead to supply<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:787.1732px;\">contracts becoming onerous. As at 31 December 2022, the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:771.57715px;\">Corpus Christi contract is expected to return a positive value<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:755.981px;\">and on this basis the onerous contract provision has been<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:740.38495px;\">reversed to nil (2021: $214 million). This and other contractual<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:724.7888px;\">arrangements could be impacted by adverse market conditions<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:709.19275px;\">arising from climate-related factors.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:681.2143px;\">Deferred tax assets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:665.61426px;\"><span class=\"_ _2e9\">The Group has determined that it is probable that sufficient<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:650.0182px;\">future taxable income will be available to utilise the deferred<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:634.42206px;\">tax assets relating to carry forward unused tax losses and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:618.826px;\">credits recognised as at 31 December 2022. The recoverability of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:603.22986px;\">deferred tax assets is dependent on the Group\u2019s future taxable<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:587.6338px;\">income which can be impacted by the uncertainty of commodity<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:572.03766px;\">and carbon pricing.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:544.0592px;\">Regulatory environment<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:528.4592px;\">Regulation of climate-related emissions can change over time.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:512.8631px;\">Woodside is not currently aware of speci\ufb01c proposals that<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:497.26703px;\">would materially change the assumptions underpinning the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:481.6709px;\">\ufb01nancial statements.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">108<span class=\"_ _1a\"> </span><span class=\"ff21 fc5\">|     Annual Report 20<span class=\"_ _1\"/>22<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:916.95447px;\">Financial and capital risk management<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:900.26935px;\">The Board of Directors has overall responsibility for the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:887.26935px;\">establishment and oversight of the Group\u2019s risk management<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:874.26935px;\">framework, including review and approval of the Group\u2019s risk<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:861.26935px;\">management strategy, policy and key risk parameters. The Board<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:848.26935px;\">of Directors and the Audit and Risk Committee have oversight of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:835.26935px;\">the Group\u2019s internal control system and risk management process,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:822.26935px;\">including oversight of the internal audit function.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:801.89575px;\">The Group\u2019s management of \ufb01nancial and capital risks is aimed <span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:788.89575px;\">at ensuring that available capital, funding and cash \ufb02ows are<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:775.89575px;\"><span class=\"_ _2e9\">sufficient to:<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:11.078209px; bottom:755.52216px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">meet the Group\u2019s \ufb01nancial commitments as and when they fall<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:21.213531px; bottom:742.52216px;\">due;<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:11.078209px; bottom:723.99976px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws92\">maintain the capacity to fund its committed project developments;<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:11.078209px; bottom:705.4669px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">pay a reasonable dividend; and<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:11.078209px; bottom:686.93414px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">maintain a long-term credit rating of not less than \u2018investment<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:21.213531px; bottom:673.93414px;\">grade\u2019.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:653.56055px;\">The Group monitors and tests its forecast \ufb01nancial position against<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:640.56055px;\">these criteria and, in general, will undertake hedging activity when<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:627.56055px;\">necessary to ensure that these objectives are achieved.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:607.18695px;\">Other circumstances that may lead to hedging include the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:594.18695px;\">management of exposures relating to trading activities. It is, and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:581.18695px;\">has been throughout the period, the Group Treasury policy that<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:568.18695px;\">no speculative trading in \ufb01nancial instruments shall be undertaken.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:555.18695px;\">Refer to Section 3.8 Risk Factors <span class=\"ws20\">for </span>more information on the Group\u2019s<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:542.18695px;\">objectives, policies and processes for managing \ufb01nancial risk.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:521.81335px;\">The below risks arise in the normal course of the Group\u2019s business. <span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:508.81335px;\">Risk information can be found in the following sections:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:12.6877365px; bottom:485.01813px;\">Section A<span class=\"_ _b5\"> </span>Commodity price risk management<span class=\"_ _92\"> </span>Page 109<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:12.6877365px; bottom:470.43735px;\">Section A<span class=\"_ _b5\"> </span>Foreign exchange risk management<span class=\"_ _1a\"> </span>Page 109<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:12.6877365px; bottom:455.85654px;\">Section C<span class=\"_ _e3\"> </span>Capital risk management<span class=\"_ _107\"> </span>Page 132<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:12.6877365px; bottom:441.27573px;\">Section C<span class=\"_ _e3\"> </span>Liquidity risk management<span class=\"_ _210\"> </span>Page 132<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:12.6877365px; bottom:426.69495px;\">Section C<span class=\"_ _e3\"> </span>Interest rate risk management<span class=\"_ _bf\"> </span>Page 132<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:12.6877365px; bottom:412.11414px;\">Section D<span class=\"_ _b5\"> </span>Credit risk management<span class=\"_ _9f\"> </span>Page 136<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:356.82153px; bottom:913.2695px;\">K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:896.58435px;\">In applying the Group\u2019s accounting policies, management<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:883.58435px;\">continually evaluates judgements, estimates and assumptions<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:870.58435px;\">based on experience and other factors, including expectations<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:857.58435px;\">of future events that may have an impact on the Group. All<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:844.58435px;\">judgements, estimates and assumptions made are believed to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:831.58435px;\">be reasonable based on the most current set of circumstances<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:818.58435px;\"><span class=\"_ _2e9\">known to management, and actual results may differ. Signi\ufb01cant<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:805.58435px;\">judgements, estimates and assumptions made by management<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:792.58435px;\">in the preparation of these \ufb01nancial statements are found in the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:779.58435px;\">following notes:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:358.33005px; bottom:760.20917px;\">Note A.1<span class=\"_ _53\"> </span>Revenue from contracts with customers<span class=\"_ _df\"> </span>Page 110<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:358.33005px; bottom:745.47235px;\">Note A.5<span class=\"_ _de\"> </span><span class=\"ws20\">Taxes<span class=\"_ _104\"> </span></span>Page 115<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:358.33005px; bottom:730.73553px;\">Note B.2<span class=\"_ _184\"> </span>Exploration and evaluation<span class=\"_ _9c\"> </span>Page 120<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:358.33005px; bottom:715.9988px;\">Note B.3<span class=\"_ _184\"> </span>Oil and gas properties<span class=\"_ _191\"> </span>Page 121<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:358.33005px; bottom:701.26196px;\">Note B.4<span class=\"_ _de\"> </span>Impairment of exploration and evaluation,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:410.6518px; bottom:688.26196px;\">oil and gas properties and goodwill<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:600.6087px; bottom:701.26196px;\">Page 123<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:358.33005px; bottom:676.3644px;\">Note B.5<span class=\"_ _184\"> </span>Business combination<span class=\"_ _178\"> </span>Page 128<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:358.33005px; bottom:661.62756px;\">Note B.6<span class=\"_ _de\"> </span>Signi\ufb01cant production and growth asset<span class=\"_ _4f\"/> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:410.6518px; bottom:648.62756px;\">acquisitions<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:600.6087px; bottom:661.62756px;\">Page 130<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:358.33005px; bottom:633.48517px;\">Note B.7<span class=\"_ _183\"> </span>Disposal of assets<span class=\"_ _212\"> </span>Page 131<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:358.33005px; bottom:618.74835px;\">Note D.5<span class=\"_ _de\"> </span><span class=\"ws20\">Provisions<span class=\"_ _21\"> </span></span>Page 138<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:358.33005px; bottom:604.01154px;\">Note D.6<span class=\"_ _148\"> </span>Other \ufb01nancial assets and liabilities<span class=\"_ _164\"> </span>Page 140<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:358.33005px; bottom:589.2748px;\">Note D.7<span class=\"_ _de\"> </span><span class=\"ws20\">Leases<span class=\"_ _213\"> </span></span>Page 143<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:358.33005px; bottom:574.53796px;\">Note E.6<span class=\"_ _183\"> </span>Joint arrangements<span class=\"_ _1a1\"> </span>Page 149<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"left:651.3286px; bottom:1.4145012px;\">109<span class=\"_ _49\"/><span class=\"ff1e fc5\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h24 ff1d fs2 fc0 sc0 ls0 ws0\" style=\"bottom:927.4896px;\">In this section<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws2c\" style=\"bottom:904.51953px;\">This section addresses \ufb01nancial performance of the Group for the reporting period including, where applicable, the accounting policies </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:888.92346px;\">applied and the key estimates and judgements made. This section also includes the tax position of the Group for and at the end of the </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:873.32733px;\">reporting period.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h3 ff1f fs1 fce sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:845.6818px;\">A. <span class=\"_ _1d\"> </span>Earnings for the year<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:827.2144px;\">A.1 <span class=\"_ _15\"> </span>Segment revenue and expenses<span class=\"_ _212\"> </span>Page 110<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:808.7869px;\">A.2  Finance costs<span class=\"_ _214\"> </span>Page 114<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:790.35944px;\">A.3  Dividends paid and proposed<span class=\"_ _ea\"> </span>Page 114<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:771.9319px;\">A.4 <span class=\"_ _11c\"> </span>Earnings/(losses) per share<span class=\"_ _197\"> </span>Page 114<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws93\" style=\"left:1.8680992px; bottom:753.5044px;\">A.5 Taxes<span class=\"_ _e\"> </span><span class=\"ws0\">Page 115<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h24 ff1d fs2 fc0 sc0 ls0 ws0\" style=\"bottom:716.3459px;\">K<span class=\"_ _1\"/>ey \ufb01nancial and capital risks in this section<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:688.3908px;\">Commodity price risk management </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:672.7908px;\">The Group\u2019s revenue is exposed to commodity price \ufb02uctuations through the sale of hydrocarbons. Commodity price risks are </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:657.1947px;\">measured by monitoring and stress testing the Group\u2019s forecast \ufb01nancial position to sustained periods of low oil and gas prices.  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:641.5986px;\">This analysis is regularly performed on the Group\u2019s portfolio and as required for discrete projects and transactions. </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:618.6315px;\">The Group\u2019s management of commodity price risk includes the use of commodity derivatives to hedge its exposure (refer to Note </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:603.0354px;\">D.6). The hedged exposure includes oil-linked revenue related to produced volumes and revenues derived from trading operations. </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:587.4393px;\">Commodity derivatives protect the Group against downside price risk within its strategic and trading portfolio. </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:564.47217px;\">As at the reporting date, the Group held hedging \ufb01nancial instruments with a net liability carrying value of $557 million (2021:  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:548.8761px;\">$431 million) exposed to commodity price risk. An increase in relevant commodity prices of 10% would increase the instruments\u2019 net </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:533.27997px;\"><span class=\"_ _2e9\">liability by $219 million, the effect of which would be recognised within reserves and/or the income statement in accordance with </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:517.6839px;\"><span class=\"_ _2e9\">hedge accounting application. A 10% decrease would have the same but opposite effect. This analysis assumes that all other variables </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:502.08777px;\">remain constant (including the price on underlying physical exposures).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:474.09555px;\">Foreign exchange risk management </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:458.49554px;\">Foreign exchange risk arises from future commitments, \ufb01nancial assets and \ufb01nancial liabilities that are not denominated in US dollars.  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:442.89944px;\">The majority of the Group\u2019s revenue is denominated in US dollars. The Group is exposed to foreign currency risk arising from </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:427.30334px;\">operating and capital expenditure incurred in currencies other than US dollars, particularly Australian dollars.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:404.33624px;\">The Group\u2019s management of foreign exchange risk relating to capital expenditure includes the use of forward exchange contract </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:388.74014px;\">derivatives to hedge its exposure (refer to Note D.6). </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:365.77304px;\">As at the reporting date, the Group held hedging \ufb01nancial instruments with a net liability carrying value of $17 million (2021: net asset </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:350.17694px;\">carrying value of $10 million) exposed to foreign exchange risk. </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:327.20984px;\">Measuring the exposure to foreign exchange risk is achieved by regularly monitoring and performing sensitivity analysis on the  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:311.61374px;\">Group\u2019s \ufb01nancial position.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:288.64664px;\">A reasonably possible change in the exchange rate of the US dollar to the Australian dollar (+12%/-12% (2021: +12%/-12%)), with all </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:273.05054px;\">other variables held constant, would not have a material impact on the Group\u2019s equity or the income statement. Refer to Notes C1, </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:257.45444px;\">C2, D2, D4 and D7 for details of the denominations of cash and cash equivalents, interest-bearing liabilities, receivables, payables and </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:241.85834px;\">lease liabilities held at 31 December 2022.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:218.89124px;\">The Group entered into foreign exchange forward contracts to \ufb01x the Australian dollar to US dollar exchange rate in relation to </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:203.29514px;\">a portion of the Australian dollar denominated capital expenditure incurred or expected to be incurred under the Scarborough </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:187.69904px;\">development from 2022 to 2025 (refer to Note D.6). In order to hedge the foreign exchange risk and interest rate risk (refer to Section </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:172.10294px;\">C) of a Swiss Franc (CHF) denominated medium term note, Woodside holds a number of cross-currency interest rate swaps (refer to </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:156.50684px;\">Notes C.2 and D.6). The aim of these investments is to convert the \ufb01xed interest CHF bond into variable interest US dollar debt. </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">A. Earnings for the y<span class=\"_ _0\"/>ear<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">110<span class=\"_ _22\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">A.<span class=\"_ _1\"/>1 <span class=\"_ _93\"> </span>Segment r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue and e<span class=\"_ _1\"/>xpenses<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">Operating segment information<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:883.93445px;\">The Group has identi\ufb01ed its operating segments based on<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:868.3384px;\">the internal reports that are reviewed and used by the Chief<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:852.74225px;\"><span class=\"_ _2e9\">Executive Officer (Chief Operating Decision Maker) in assessing<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:837.1462px;\">performance and determining the allocation of resources.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:814.1791px;\">As a result of the merger with BHPP on 1 June 2022, the Group<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:798.58295px;\">has transformed into a global energy company which has led to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:782.9869px;\">a change in how \ufb01nancial information is reported in the Group.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:767.39075px;\">The disclosed operating segments have been updated to re\ufb02ect<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:751.7947px;\">this change and the 2021 and 2020 amounts have been restated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:736.19855px;\">to be presented on the same basis.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:713.23145px;\">Operating segments outlined below are identi\ufb01ed by<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:697.6354px;\">management based on the nature and geographical location  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:682.03925px;\">of the business and venture.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc5 ff1f fs56 fc4 sc0 ls0 ws0\" style=\"left:8.955307px; bottom:653.0616px;\">Austr<span class=\"_ _1\"/>alia:<span class=\"_ _2e9\"> </span></div><div class=\"t m3d h61 ff1f fs3 fc4 sc0 ls26 ws0\" style=\"left:8.955307px; bottom:638.7616px;\">Exploration, evaluation, development, production and sale of<span class=\"_ _2e9\"> </span> </div><div class=\"t m3d h61 ff1f fs3 fc4 sc0 ls26 ws0\" style=\"left:8.955307px; bottom:624.4642px;\">liqui\ufb01ed natural gas, pipeline gas, crude oil and condensate<span class=\"_ _2e9\"> </span> </div><div class=\"t m3d h61 ff1f fs3 fc4 sc0 ls26 ws0\" style=\"left:8.955307px; bottom:610.1668px;\">and natural gas liquids in Australia.<span class=\"_ _2e9\"> </span></div><div class=\"t m4 hc5 ff1f fs56 fc4 sc0 ls0 ws0\" style=\"left:8.955307px; bottom:582.3766px;\">International:<span class=\"_ _2e9\"> </span></div><div class=\"t m3d h61 ff1f fs3 fc4 sc0 ls26 ws0\" style=\"left:8.955307px; bottom:568.0766px;\">Exploration, evaluation, development, production and sale of<span class=\"_ _2e9\"> </span> </div><div class=\"t m3d h61 ff1f fs3 fc4 sc0 ls26 ws0\" style=\"left:8.955307px; bottom:553.7792px;\">pipeline gas, crude oil and condensate and natural gas liquids<span class=\"_ _2e9\"> </span> </div><div class=\"t m3d h61 ff1f fs3 fc4 sc0 ls26 ws0\" style=\"left:8.955307px; bottom:539.48175px;\">in international jurisdictions outside of Australia.<span class=\"_ _2e9\"> </span></div><div class=\"t m4 hc5 ff1f fs56 fc4 sc0 ls0 ws0\" style=\"left:8.955307px; bottom:511.69153px;\">Marketing:<span class=\"_ _2e9\"> </span></div><div class=\"t m3d h61 ff1f fs3 fc4 sc0 ls26 ws0\" style=\"left:8.955307px; bottom:497.39154px;\">Marketing, Shipping and Trading of Woodside\u2019s oil and gas<span class=\"_ _2e9\"> </span> </div><div class=\"t m3d h61 ff1f fs3 fc4 sc0 ls26 ws0\" style=\"left:8.955307px; bottom:483.09412px;\">portfolio (including non-produced volumes) and optimisation<span class=\"_ _2e9\"> </span> </div><div class=\"t m3d h61 ff1f fs3 fc4 sc0 ls26 ws0\" style=\"left:8.955307px; bottom:468.79675px;\">activities attributed to Marketing which have generated<span class=\"_ _2e9\"> </span> </div><div class=\"t m3d h61 ff1f fs3 fc4 sc0 ls26 ws0\" style=\"left:8.955307px; bottom:454.49933px;\">incremental value.<span class=\"_ _2e9\"> </span></div><div class=\"t m4 hc5 ff1f fs56 fc4 sc0 ls0 ws0\" style=\"left:8.955307px; bottom:426.7065px;\">Corpor<span class=\"_ _1\"/>ate/<span class=\"_ _1\"/>Other it<span class=\"_ _1\"/>ems:<span class=\"_ _2e9\"> </span></div><div class=\"t m3d h61 ff1f fs3 fc4 sc0 ls26 ws0\" style=\"left:8.955307px; bottom:412.40652px;\">Corporate/Other items comprise primarily corporate non-<span class=\"_ _2e9\"> </span></div><div class=\"t m3d h61 ff1f fs3 fc4 sc0 ls26 ws0\" style=\"left:8.955307px; bottom:398.1091px;\">segmental items of revenue and expenses and associated<span class=\"_ _2e9\"> </span> </div><div class=\"t m3d h61 ff1f fs3 fc4 sc0 ls26 ws0\" style=\"left:8.955307px; bottom:383.8117px;\">assets and liabilities not allocated to operating segments as<span class=\"_ _2e9\"> </span> </div><div class=\"t m3d h61 ff1f fs3 fc4 sc0 ls26 ws0\" style=\"left:8.955307px; bottom:369.5143px;\">they are not considered part of the core operations of any<span class=\"_ _2e9\"> </span> </div><div class=\"t m3d h61 ff1f fs3 fc4 sc0 ls26 ws2e\" style=\"left:8.955307px; bottom:355.21692px;\">segment.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:323.02383px;\">In addition to the updated segments, the Group has reassessed<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:307.42773px;\">the reporting of revenue from the sale of liqui\ufb01ed natural gas<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:291.83163px;\">on a portfolio basis. With the Marketing segment separately<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:276.23553px;\">reported for the year ended 31 December 2022, the Group will<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:260.63943px;\">no longer report revenue from the sale of liqui\ufb01ed natural gas on<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:245.04333px;\">a portfolio basis to better represent the revenues and margins<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:229.44724px;\">generated by each segment. 2021 and 2020 amounts have been<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:213.85114px;\">restated to be presented on the same basis.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:185.86877px;\">Major customer information<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:170.26877px;\">The Group has two major customers which respectively account<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:154.67267px;\">for 12% and 9% of the Group\u2019s external revenue. The sales are<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:139.07657px;\">generated by the Australia and Marketing operating segments<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:123.48047px;\">(2021: two major customers; 8% and 6% generated by the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:107.88437px;\">Australia operating segment and 2020: two major customers;<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:92.28827px;\">15% and 13% generated by the Australia operating segment).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:898.60016px;\">Geographical<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:888.85016px;\">information<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:450.57858px; bottom:901.0961px;\">Rev<span class=\"_ _1\"/>enue from e<span class=\"_ _1\"/>xternal<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:475.6963px; bottom:890.6929px;\">customers</div><div class=\"t m0 hab ff22 fs54 fc1 sc0 ls0 ws0\" style=\"left:519.49927px; bottom:893.9394px;\">1<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:576.8685px; bottom:901.09265px;\">Non-current<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:589.6319px; bottom:890.6894px;\">assets</div><div class=\"t m0 hab ff22 fs54 fc1 sc0 ls0 ws0\" style=\"left:615.53894px; bottom:893.9394px;\">2<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:450.57858px; bottom:874.7856px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _181\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _df\"> </span>2020<span class=\"_ _d5\"> </span></span>202<span class=\"_ _4f\"/>2<span class=\"_ _181\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:449.12036px; bottom:860.7163px;\">US$m<span class=\"_ _53\"> </span>US$m<span class=\"_ _4d\"> </span>US$m<span class=\"_ _e2\"> </span>US$m<span class=\"_ _53\"> </span>US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:846.6471px;\">Asia Paci\ufb01c<span class=\"_ _174\"> </span><span class=\"ff1f\"> 12,521 <span class=\"_ _51\"> </span></span> 6,342 <span class=\"_ _de\"> </span> 3,362 <span class=\"_ _91\"> </span><span class=\"ff1f\"> 36,966 <span class=\"_ _91\"> </span></span> 18,386<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:832.5778px;\">Americas<span class=\"_ _63\"> </span><span class=\"ff1f\"> 1,545 <span class=\"_ _c0\"> </span></span> - <span class=\"_ _c0\"> </span> - <span class=\"_ _c1\"> </span><span class=\"ff1f\"> 7<span class=\"_ _1\"/>,<span class=\"_ _1\"/>057 <span class=\"_ _bf\"> </span><span class=\"ff20\"> 1<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:818.50854px;\">Africa<span class=\"_ _114\"> </span><span class=\"ff1f\"> - <span class=\"_ _c0\"> </span></span> - <span class=\"_ _c0\"> </span> - <span class=\"_ _184\"> </span><span class=\"ff1f\"> 4,049 <span class=\"_ _51\"> </span></span> 2,802<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:804.43933px;\">Europe<span class=\"_ _fc\"> </span><span class=\"ff1f\"> 2,751 <span class=\"_ _e2\"> </span></span> 620 <span class=\"_ _dc\"> </span> 238 <span class=\"_ _b7\"> </span><span class=\"ff1f\"> - <span class=\"_ _c0\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:787.4256px;\">Consolidated<span class=\"_ _17a\"> </span><span class=\"fc1\"> 16,817 <span class=\"_ _51\"> </span><span class=\"ff20\"> 6,962 <span class=\"_ _41\"> </span> 3,600 <span class=\"_ _91\"> </span></span> 48,072 <span class=\"_ _51\"> </span><span class=\"ff20\"> 21,189<span class=\"_ _2e9\"> </span></span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:773.90594px;\">1. <span class=\"_ _29\"> </span>Rev<span class=\"_ _1\"/>enue is attributable to geogr<span class=\"_ _1\"/>aphic location based on the location of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:762.98596px;\">customers.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:749.4452px;\">2.  Non-current assets e<span class=\"_ _1\"/>xclude deferr<span class=\"_ _1\"/>ed tax of $1,959 million (2021:  </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:738.52515px;\">$1,00<span class=\"_ _1\"/>7 million).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:705.03925px;\">Recognition and measurement<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:684.4541px;\">Revenue from contracts with customers<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:668.8541px;\">Revenue is recognised when or as the Group transfers control<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:653.25806px;\">of products or provides services to a customer at the amount<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:637.6619px;\">to which the Group expects to be entitled. If the consideration<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:622.06586px;\">includes a variable component, the Group estimates the amount<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:606.4697px;\">of the expected consideration receivable. Variable consideration<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:590.87366px;\">is estimated throughout the contract and is recognised to the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:575.2775px;\">extent that it is highly probable a signi\ufb01cant reversal will  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:559.68146px;\">not occur.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:536.71436px;\">\u2022 <span class=\"_ _4b\"> </span><span class=\"ff22\">Revenue from sale of hydrocarbons </span>\u2013 Revenue from the sale<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:521.1182px;\">of hydrocarbons is recognised at a point in time when control<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:505.52216px;\">of the product is transferred to the customer. Revenue from<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:489.92603px;\">take or pay contracts is recorded as unearned revenue until<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:474.32993px;\">the product has been drawn by the customer (transfer of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:458.73383px;\">control), at which time it is recognised in earnings.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:439.45224px;\">\u2022 <span class=\"_ _4b\"> </span><span class=\"ff22\">Other operating revenue </span>\u2013 Revenue earned from LNG<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:423.85614px;\">processing and other services is recognised over time as  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:408.26004px;\">the services are rendered.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:383.92896px;\">Expenses<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:368.32898px;\">\u2022 <span class=\"_ _4b\"> </span><span class=\"ff22\">Royalties, excise and levies </span>\u2013<span class=\"ff22\"> </span>Royalties, excise and levies are<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:352.73288px;\">considered to be production-based taxes and are therefore<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:337.13678px;\">accrued on the basis of the Group\u2019s entitlement to physical<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:321.54068px;\">production.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:302.25906px;\">\u2022 <span class=\"_ _4b\"> </span><span class=\"ff22\">Depreciation and amortisatio</span>n \u2013 Refer to Note B.3.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:282.97748px;\">\u2022 <span class=\"_ _4b\"> </span><span class=\"ff22\">Impairment and impairment reversals</span> \u2013 Refer to Note B.4.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:263.69586px;\">\u2022 <span class=\"_ _4b\"> </span><span class=\"ff22\">Leases</span> \u2013 Refer to Note D.7.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:244.41428px;\">\u2022 <span class=\"_ _4b\"> </span><span class=\"ff22\">Employee bene\ufb01ts</span> \u2013 Refer to Note E.2.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:349.54126px; bottom:212.72638px;\">K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc5 ff1f fs56 fce sc0 ls0 ws0\" style=\"left:349.54126px; bottom:192.14127px;\">Re<span class=\"_ _1\"/>venue fr<span class=\"_ _1\"/>om contr<span class=\"_ _1\"/>acts with cust<span class=\"_ _1\"/>omers<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:349.54126px; bottom:179.14127px;\">The transaction price at the date control passes for sales made subject<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:349.54126px; bottom:166.14127px;\">to provisional pricing periods in oil and condensate contracts is<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:349.54126px; bottom:153.14127px;\">determined with reference to quoted commodity prices.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:349.54126px; bottom:132.76767px;\">Judgement is also used to determine if it is highly probable that a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:349.54126px; bottom:119.76767px;\">signi\ufb01cant reversal will not occur in relation to revenue recognised<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:349.54126px; bottom:106.76767px;\">during open pricing periods in LNG contracts. The Group estimates<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:349.54126px; bottom:93.76767px;\">variable consideration based on available information from contract<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:349.54126px; bottom:80.76767px;\">negotiations and market indicators.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">A. Earnings for the y<span class=\"_ _0\"/>ear<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"left:654.8668px; bottom:1.4145012px;\">111<span class=\"_ _49\"/><span class=\"ff1e fc5\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">A.<span class=\"_ _1\"/>1 <span class=\"_ _93\"> </span>Segment r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue and e<span class=\"_ _1\"/>xpenses (<span class=\"_ _1\"/>c<span class=\"_ _1\"/>ont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc4 sc0 ls78 ws90\" style=\"left:325.55576px; bottom:894.49774px;\">Australia<span class=\"_ _b3\"> </span><span class=\"ls79 ws94\">Interna<span class=\"_ _1\"/>tional<span class=\"_ _d4\"> </span><span class=\"ls0 ws0\">Mar<span class=\"_ _4f\"/>ketin<span class=\"_ _4f\"/>g<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hbb ff1f fs4b fc4 sc0 ls7a ws95\" style=\"left:533.7124px; bottom:899.37274px;\">Corpo<span class=\"_ _4f\"/>rate/<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc4 sc0 ls78 ws90\" style=\"left:545.1797px; bottom:889.62274px;\">Other<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc4 sc0 ls7b ws96\" style=\"left:600.6087px; bottom:894.49774px;\">Consolidated<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:352.21954px; bottom:873.72046px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _160\"> </span>2022<span class=\"_ _160\"> </span>2<span class=\"_ _4f\"/>022<span class=\"_ _160\"> </span>202<span class=\"_ _4f\"/>2<span class=\"_ _160\"> </span>2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:349.54126px; bottom:859.65125px;\">US$m<span class=\"_ _5\"> </span>US$m<span class=\"_ _5\"> </span>US$m<span class=\"_ _5\"> </span>US$m<span class=\"_ _18a\"> </span><span class=\"ls7c ws97\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:845.582px;\">Lique\ufb01ed natural gas<span class=\"_ _72\"> </span><span class=\"ff1f\">8,855 <span class=\"_ _5a\"> </span>-<span class=\"_ _7\"> </span>2,434 <span class=\"_ _5a\"> </span>-<span class=\"_ _5\"> </span>11,289<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:831.51276px;\">Pipeline gas<span class=\"_ _215\"> </span><span class=\"ff1f\">1,086 <span class=\"_ _13f\"> </span><span class=\"ls72 ws8b\">276 <span class=\"_ _5a\"> </span></span>-<span class=\"_ _13\"> </span>-<span class=\"_ _143\"> </span>1,362<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:817.4435px;\">Crude oil and condensate<span class=\"_ _e\"> </span><span class=\"ff1f\">2,467 <span class=\"_ _163\"> </span><span class=\"lsa wsf\">1,273<span class=\"_ _4f\"/> <span class=\"_ _f0\"> </span></span>18 <span class=\"_ _5a\"> </span>-<span class=\"_ _210\"> </span>3,758<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:803.3742px;\">Natural gas liquids<span class=\"_ _216\"> </span><span class=\"ff1f\">171 <span class=\"_ _79\"> </span><span class=\"ls6c ws85\">26 <span class=\"_ _217\"> </span></span>9 <span class=\"_ _5a\"> </span>-<span class=\"_ _a5\"> </span>206<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:789.305px;\">Rev<span class=\"_ _1\"/>enue fr<span class=\"_ _1\"/>om sale of hydr<span class=\"_ _1\"/>ocarbons<span class=\"_ _161\"> </span><span class=\"ff1f\">12,579 <span class=\"_ _163\"> </span>1,5<span class=\"_ _1\"/>75 <span class=\"_ _165\"> </span>2,461 <span class=\"_ _5a\"> </span>-<span class=\"_ _17a\"> </span>16,615<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:775.2357px;\">Intersegment r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/><span class=\"_ _2e9\">enue1</span><span class=\"_ _218\"> </span><span class=\"ff1f ls6e ws87\">(455<span class=\"_ _4f\"/>)<span class=\"_ _a9\"> </span></span><span class=\"ff1f\">(5)<span class=\"_ _ac\"> </span>460 <span class=\"_ _5a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:761.1665px;\">Proc<span class=\"_ _1\"/>essing and services r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue<span class=\"_ _20\"> </span><span class=\"ff1f\">175 <span class=\"_ _5a\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _79\"> </span>175<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:747.0972px;\">Shipping and other re<span class=\"_ _1\"/>venue<span class=\"_ _219\"> </span><span class=\"ff1f\">-<span class=\"_ _13\"> </span>-<span class=\"_ _a7\"> </span><span class=\"ls2b ws32\">27 <span class=\"_ _5a\"> </span></span>-<span class=\"_ _a7\"> </span><span class=\"ls2b ws32\">27<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ls2b ws32\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:733.02795px;\">Other re<span class=\"_ _1\"/>venue<span class=\"_ _21a\"> </span><span class=\"ff1f\">(280)<span class=\"_ _a9\"> </span>(5)<span class=\"_ _b0\"> </span>487 <span class=\"_ _5a\"> </span>-<span class=\"_ _174\"> </span>20<span class=\"_ _1\"/>2<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:716.0142px;\">Operating r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue</div><div class=\"t m0 hab ff22 fs54 fc0 sc0 ls0 ws0\" style=\"left:80.50484px; bottom:719.3048px;\">2<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:348.1162px; bottom:716.05804px;\">12,299 <span class=\"_ _7\"> </span>1,57<span class=\"_ _1\"/>0 <span class=\"_ _16c\"> </span>2,948 <span class=\"_ _5a\"> </span>-<span class=\"_ _18a\"> </span>16,817<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:701.99854px;\">Production c<span class=\"_ _1\"/>osts<span class=\"_ _21b\"> </span><span class=\"ff1f\">(975)<span class=\"_ _143\"> </span>(313)<span class=\"_ _a\"> </span>-<span class=\"_ _63\"> </span>7 <span class=\"_ _bc\"> </span>(1<span class=\"_ _4f\"/>,281<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\">)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:687.92926px;\">Ro<span class=\"_ _1\"/>yalties, e<span class=\"_ _1\"/>xcise and le<span class=\"_ _1\"/>vies<span class=\"_ _21c\"> </span><span class=\"ff1f\">(540)<span class=\"_ _13f\"> </span>(39)<span class=\"_ _217\"> </span>-<span class=\"_ _10d\"> </span>(17)<span class=\"_ _103\"> </span>(596)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:673.86005px;\">Insuranc<span class=\"_ _1\"/>e<span class=\"_ _21d\"> </span><span class=\"ff1f\">(35)<span class=\"_ _a9\"> </span>(7)<span class=\"_ _78\"> </span>-<span class=\"_ _a\"> </span>(1)<span class=\"_ _13f\"> </span><span class=\"ls6e ws87\">(43)<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:659.7908px;\">Inv<span class=\"_ _1\"/>entory mo<span class=\"_ _1\"/>vement<span class=\"_ _21e\"> </span><span class=\"ff1f\">44 <span class=\"_ _9f\"> </span>(3)<span class=\"_ _78\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _9d\"> </span><span class=\"ls70 ws89\">41<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ls70 ws89\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:645.72156px;\">Costs of pr<span class=\"_ _1\"/>oduction<span class=\"_ _21f\"> </span><span class=\"ff1f\">(1,506)<span class=\"_ _163\"> </span>(362)<span class=\"_ _a\"> </span>-<span class=\"_ _10b\"> </span>(11)<span class=\"_ _164\"> </span>(1,879)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:631.6523px;\">Land and buildings<span class=\"_ _98\"> </span><span class=\"ff1f\">(51)<span class=\"_ _a9\"> </span>(3)<span class=\"_ _78\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _a2\"> </span>(54)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:617.58307px;\">T<span class=\"_ _0\"/>ransferred e<span class=\"_ _1\"/>xplor<span class=\"_ _1\"/>ation and ev<span class=\"_ _1\"/>aluation <span class=\"_ _25\"> </span><span class=\"ff1f\">(107)<span class=\"_ _13\"> </span>-<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _ae\"> </span>(107<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\">)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:603.5138px;\">Plant and equipment <span class=\"_ _220\"> </span><span class=\"ff1f\">(2,<span class=\"_ _1\"/>168)<span class=\"_ _103\"> </span>(436)<span class=\"_ _a\"> </span>-<span class=\"_ _5d\"> </span>(33)<span class=\"_ _da\"> </span>(2,637)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:589.4445px;\">Oil and gas properties depr<span class=\"_ _1\"/>eciation and amortisation<span class=\"_ _221\"> </span><span class=\"ff1f\">(2,326)<span class=\"_ _103\"> </span><span class=\"ls6e ws87\">(439<span class=\"_ _4f\"/>)<span class=\"_ _a\"> </span></span>-<span class=\"_ _5d\"> </span>(33)<span class=\"_ _da\"> </span>(2,798<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\">)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:575.385px;\">Shipping and direct sales c<span class=\"_ _1\"/>osts<span class=\"_ _222\"> </span><span class=\"ff1f\">(312)<span class=\"_ _13f\"> </span>(36)<span class=\"_ _13f\"> </span>(73)<span class=\"_ _13f\"> </span>142 <span class=\"_ _160\"> </span>(279<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\">)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:561.3158px;\">T<span class=\"_ _0\"/>rading costs<span class=\"_ _223\"> </span><span class=\"ff1f\">(14)<span class=\"_ _a\"> </span>-<span class=\"_ _5\"> </span>(1,763)<span class=\"_ _217\"> </span>-<span class=\"_ _165\"> </span>(1,777<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\">)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:547.2465px;\">Other hy<span class=\"_ _1\"/>drocarbon cos<span class=\"_ _1\"/>ts<span class=\"_ _224\"> </span><span class=\"ff1f\">(19)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _61\"> </span>(19)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:533.187px;\">Other cost of sales<span class=\"_ _225\"> </span><span class=\"ff1f ls6e ws87\">(4)<span class=\"_ _78\"> </span></span><span class=\"ff1f\">-<span class=\"_ _5f\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _105\"> </span><span class=\"ls6e ws87\">(4<span class=\"_ _4f\"/>)<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:519.1178px;\">Mov<span class=\"_ _1\"/>ement in oner<span class=\"_ _1\"/>ous contract pr<span class=\"_ _1\"/>o<span class=\"_ _1\"/><span class=\"_ _2e9\">vision3</span><span class=\"_ _1a7\"> </span><span class=\"ff1f\">-<span class=\"_ _5f\"> </span>-<span class=\"_ _a4\"> </span>216 <span class=\"_ _5a\"> </span>-<span class=\"_ _5d\"> </span>216<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:505.04852px;\">Other cost of sales<span class=\"_ _21e\"> </span><span class=\"ff1f\">(349)<span class=\"_ _13f\"> </span>(36)<span class=\"_ _fa\"> </span>(1,620)<span class=\"_ _13f\"> </span>142 <span class=\"_ _17f\"> </span>(1,863)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:488.0348px;\">Cost of sales<span class=\"_ _226\"> </span><span class=\"fc1\">(4,<span class=\"_ _1\"/>181)<span class=\"_ _163\"> </span>(837)<span class=\"_ _fa\"> </span>(1,620)<span class=\"_ _ab\"> </span>98 <span class=\"_ _188\"> </span>(6,540)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:471.02103px;\">Gross pr<span class=\"_ _1\"/>o\ufb01t<span class=\"_ _227\"> </span><span class=\"fc1\">8,<span class=\"_ _1\"/>118 <span class=\"_ _13f\"> </span>733 <span class=\"_ _103\"> </span>1,328 <span class=\"_ _79\"> </span>98 <span class=\"_ _ba\"> </span>10,277<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:454.0073px;\">Other income</div><div class=\"t m0 hab ff22 fs54 fc0 sc0 ls0 ws0\" style=\"left:59.24607px; bottom:457.30032px;\">4<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:359.57117px; bottom:454.05356px;\">722 <span class=\"_ _a1\"> </span>4 <span class=\"_ _a\"> </span>5 <span class=\"_ _106\"> </span>4 <span class=\"_ _13f\"> </span><span class=\"lsa wsf\">735<span class=\"_ _4f\"/> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:439.9843px;\">Exploration and e<span class=\"_ _1\"/>valua<span class=\"_ _1\"/>tion expenditur<span class=\"_ _1\"/><span class=\"_ _2e9\">e5</span><span class=\"_ _d1\"> </span><span class=\"ff1f\">(20)<span class=\"_ _210\"> </span>(277)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>1 <span class=\"_ _a8\"> </span>(296)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:425.92484px;\">Amortisation of permit acquisition<span class=\"_ _228\"> </span><span class=\"ff1f\">(1)<span class=\"_ _79\"> </span>(9)<span class=\"_ _78\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _79\"> </span>(10)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:411.85556px;\">Writ<span class=\"_ _1\"/><span class=\"_ _2e9\">e-offs6</span><span class=\"_ _229\"> </span><span class=\"ff1f\">-<span class=\"_ _ae\"> </span>(164)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _ae\"> </span>(164)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:397.78632px;\">Exploration and e<span class=\"_ _1\"/>valua<span class=\"_ _1\"/>tion<span class=\"_ _22a\"> </span><span class=\"ff1f\">(21)<span class=\"_ _165\"> </span>(450)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>1 <span class=\"_ _a8\"> </span><span class=\"ls74 ws8e\">(47<span class=\"_ _4f\"/>0)<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:383.71707px;\">General, administr<span class=\"_ _1\"/>ativ<span class=\"_ _1\"/><span class=\"_ _2e9\">e and other costs7</span><span class=\"_ _83\"> </span><span class=\"ff1f\">(13)<span class=\"_ _14a\"> </span>(21)<span class=\"_ _a5\"> </span>(10)<span class=\"_ _a8\"> </span>(7<span class=\"_ _1\"/>47)<span class=\"_ _160\"> </span>(791)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:369.64783px;\">Depreciation of other plant and equipment<span class=\"_ _d1\"> </span><span class=\"ff1f\">-<span class=\"_ _13\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:355.58832px;\">Depreciation of lease as<span class=\"_ _1\"/>sets<span class=\"_ _e\"> </span><span class=\"ff1f ls6e ws87\">(49)<span class=\"_ _a4\"> </span></span><span class=\"ff1f\">(11)<span class=\"_ _a\"> </span>-<span class=\"_ _107\"> </span>(80)<span class=\"_ _a8\"> </span>(140)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:341.51907px;\">Restor<span class=\"_ _1\"/>ation mo<span class=\"_ _1\"/>vement<span class=\"_ _22b\"> </span><span class=\"ff1f\">(234)<span class=\"_ _140\"> </span>(46)<span class=\"_ _a\"> </span>-<span class=\"_ _63\"> </span>8 <span class=\"_ _143\"> </span>(272<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\">)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:327.44983px;\"><span class=\"_ _2e9\">Other8</span><span class=\"_ _22c\"> </span><span class=\"ff1f\">(8)<span class=\"_ _ae\"> </span>(84)<span class=\"_ _163\"> </span><span class=\"ls74 ws8e\">(47<span class=\"_ _4f\"/>5)<span class=\"_ _103\"> </span></span>(486)<span class=\"_ _189\"> </span>(1,053)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:313.39032px;\">Other costs<span class=\"_ _22d\"> </span><span class=\"ff1f\">(304)<span class=\"_ _143\"> </span>(162)<span class=\"_ _103\"> </span>(485)<span class=\"_ _189\"> </span>(1,305)<span class=\"_ _da\"> </span>(2,256)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:296.37656px;\">Other expenses<span class=\"_ _225\"> </span><span class=\"fc1\">(325)<span class=\"_ _143\"> </span>(612)<span class=\"_ _103\"> </span>(485)<span class=\"_ _fa\"> </span>(1,304)<span class=\"_ _da\"> </span>(2,726)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:279.36282px;\">Impairment losses<span class=\"_ _90\"> </span><span class=\"fc1\">-<span class=\"_ _13\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:262.34906px;\">Impairment re<span class=\"_ _1\"/>versals<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hab ff22 fs54 fc0 sc0 ls0 ws0\" style=\"left:91.874374px; bottom:265.61844px;\">9<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:356.82153px; bottom:262.3717px;\">900 <span class=\"_ _5a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _142\"> </span>900<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:245.35794px;\">Pro\ufb01t/(loss<span class=\"_ _1\"/>) before tax and net \ufb01nanc<span class=\"_ _1\"/>e costs<span class=\"_ _3e\"> </span><span class=\"fc1\">9,4<span class=\"_ _1\"/>15 <span class=\"_ _14a\"> </span>125 <span class=\"_ _140\"> </span>848 <span class=\"_ _17f\"> </span>(1,202)<span class=\"_ _17a\"> </span>9,186<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:231.81479px;\">1. <span class=\"_ _29\"> </span>Intersegment r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue comprises the incr<span class=\"_ _1\"/>emental income net of all associated e<span class=\"_ _1\"/>xpenses gener<span class=\"_ _1\"/>ated by the Mark<span class=\"_ _1\"/>eting segment\u2019s optimisa<span class=\"_ _1\"/>tion of the oil and gas portfolio.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:220.8948px;\">The v<span class=\"_ _1\"/>alue is incremental income net of incr<span class=\"_ _1\"/>emental costs.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:207.354px;\">2.  Operating re<span class=\"_ _1\"/>venue includes r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue fr<span class=\"_ _1\"/>om contracts with cus<span class=\"_ _1\"/>tomers of $16,7<span class=\"_ _1\"/>90 million and sub-lease income of $27 million disclosed within shipping and other r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:193.8132px;\">3.  Comprises changes in estimates of $2<span class=\"_ _1\"/><span class=\"_ _2e9\">45 million offset by pr</span><span class=\"_ _1\"/>ovisions used of $29 million. R<span class=\"_ _1\"/>efer to Note D<span class=\"_ _1\"/>.5 for further details.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:180.2724px;\">4.  Includes initial gain on T<span class=\"_ _0\"/>rain 2 sell-do<span class=\"_ _1\"/>wn of $427 million, re<span class=\"_ _1\"/>valua<span class=\"_ _1\"/>tion gain on the remeasur<span class=\"_ _1\"/>ement of the T<span class=\"_ _1\"/>r<span class=\"_ _1\"/>ain 2 sell-down v<span class=\"_ _1\"/>ariable considera<span class=\"_ _1\"/>tion of $71 million, fees and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:169.3524px;\">rec<span class=\"_ _1\"/>ov<span class=\"_ _1\"/>eries, foreign e<span class=\"_ _1\"/>x<span class=\"_ _1\"/>change gains and other income not associated with the ongoing oper<span class=\"_ _1\"/>ations of the business.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:155.8116px;\">5.  Includes $142 million for various c<span class=\"_ _1\"/>osts relating t<span class=\"_ _1\"/>o the Group\u2019<span class=\"_ _1\"/>s exit fr<span class=\"_ _1\"/>om the Orphan Basin explor<span class=\"_ _1\"/>ation licences in Canada.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:142.2708px;\">6.  $125 million r<span class=\"_ _1\"/>elates to c<span class=\"_ _1\"/>osts of unsucces<span class=\"_ _1\"/>sful wells that ha<span class=\"_ _1\"/>ve been writt<span class=\"_ _1\"/><span class=\"_ _2e9\">en off. R</span><span class=\"_ _1\"/>efer to Note B.2.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls8 wsd\" style=\"left:1.8680992px; bottom:128.73px;\">7.<span class=\"_ _4f\"/> <span class=\"_ _16\"> </span><span class=\"ls0 ws0\">T<span class=\"_ _0\"/>ransaction costs of $419 million incurr<span class=\"_ _1\"/>ed as a result of the BHPP mer<span class=\"_ _1\"/>ger on 1 June 2022 ar<span class=\"_ _1\"/>e included in the Corporat<span class=\"_ _1\"/>e/<span class=\"_ _1\"/>Other segment. Refer to Not<span class=\"_ _1\"/>e B.5 for details.<span class=\"_ _2e9\"> </span></span><span class=\"ls0 ws0\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:115.18919px;\">8.  Includes losses on hedging activities and changes in fair v<span class=\"_ _1\"/>alue of derivativ<span class=\"_ _1\"/>e \ufb01nancial instruments of $960 million in the Mark<span class=\"_ _1\"/>eting and Corpor<span class=\"_ _1\"/>ate/<span class=\"_ _1\"/>Other segments and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:104.269196px;\">other expenses not associa<span class=\"_ _1\"/>ted with the ongoing operations of the busines<span class=\"_ _1\"/>s.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls7 wsc\" style=\"left:1.8680992px; bottom:90.7284px;\">9.  <span class=\"ls0 ws0\">Impairment re<span class=\"_ _1\"/>versals on oil and gas pr<span class=\"_ _1\"/>operties. Refer t<span class=\"_ _1\"/>o Note B.4 for mor<span class=\"_ _1\"/>e details.<span class=\"_ _2e9\"> </span></span><span class=\"ls0 ws0\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">A. Earnings for the y<span class=\"_ _0\"/>ear<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">112<span class=\"_ _93\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">A.<span class=\"_ _1\"/>1 <span class=\"_ _93\"> </span>Segment r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue and e<span class=\"_ _1\"/>xpenses (<span class=\"_ _1\"/>c<span class=\"_ _1\"/>ont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc4 sc0 ls78 ws90\" style=\"left:325.55576px; bottom:894.49774px;\">Australia<span class=\"_ _b3\"> </span><span class=\"ls79 ws94\">Interna<span class=\"_ _1\"/>tional<span class=\"_ _d4\"> </span><span class=\"ls0 ws0\">Mar<span class=\"_ _4f\"/>ketin<span class=\"_ _4f\"/>g<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hbb ff1f fs4b fc4 sc0 ls7a ws95\" style=\"left:533.7124px; bottom:899.37274px;\">Corpo<span class=\"_ _4f\"/>rate/<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc4 sc0 ls78 ws90\" style=\"left:545.1797px; bottom:889.62274px;\">Other<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc4 sc0 ls7b ws96\" style=\"left:600.6087px; bottom:894.49774px;\">Consolidated<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:352.21954px; bottom:873.72046px;\"><span class=\"_ _2e9\">20218</span><span class=\"_ _160\"> </span><span class=\"_ _2e9\">20218</span><span class=\"_ _160\"> </span><span class=\"_ _2e9\">20218</span><span class=\"_ _160\"> </span><span class=\"_ _2e9\">20218</span><span class=\"_ _ae\"> </span>2021<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:349.54126px; bottom:859.65125px;\">US$m<span class=\"_ _5\"> </span>US$m<span class=\"_ _165\"> </span>US$m<span class=\"_ _165\"> </span>US$m<span class=\"_ _5\"> </span>US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:845.582px;\">Lique\ufb01ed natural gas<span class=\"_ _21f\"> </span>3,910 <span class=\"_ _6b\"> </span>-<span class=\"_ _141\"> </span>1,449 <span class=\"_ _6b\"> </span>-<span class=\"_ _a8\"> </span><span class=\"ls6a ws83\">5,359<span class=\"_ _2e9\"> </span></span><span class=\"ls6a ws83\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:831.51276px;\">Pipeline gas<span class=\"_ _22e\"> </span><span class=\"ls7d ws98\">43 <span class=\"_ _6b\"> </span></span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _a7\"> </span><span class=\"ls7d ws98\">43<span class=\"_ _2e9\"> </span></span><span class=\"ls7d ws98\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:817.4435px;\">Crude oil and condensate<span class=\"_ _22f\"> </span>1,316 <span class=\"_ _6b\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13f\"> </span>1,316<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:803.3742px;\">Natural gas liquids<span class=\"_ _230\"> </span>60 <span class=\"_ _6b\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _f0\"> </span>60<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:789.305px;\">Rev<span class=\"_ _1\"/>enue fr<span class=\"_ _1\"/>om sale of hydr<span class=\"_ _1\"/>ocarbons<span class=\"_ _3b\"> </span>5,329 <span class=\"_ _6b\"> </span>-<span class=\"_ _141\"> </span>1,449 <span class=\"_ _6b\"> </span>-<span class=\"_ _a8\"> </span>6,778<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:775.2357px;\">Intersegment r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/><span class=\"_ _2e9\">enue1</span><span class=\"_ _231\"> </span>(236)<span class=\"_ _a\"> </span>-<span class=\"_ _a2\"> </span>236 <span class=\"_ _6b\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:761.1665px;\">Proc<span class=\"_ _1\"/>essing and services r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue<span class=\"_ _20\"> </span>143 <span class=\"_ _6b\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _79\"> </span>143<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:747.0972px;\">Shipping and other re<span class=\"_ _1\"/>venue<span class=\"_ _232\"> </span>4 <span class=\"_ _6b\"> </span>-<span class=\"_ _a7\"> </span><span class=\"ls16 ws1b\">37<span class=\"_ _4f\"/> <span class=\"_ _5a\"> </span></span>-<span class=\"_ _217\"> </span><span class=\"ls6e ws87\">41<span class=\"_ _2e9\"> </span></span><span class=\"ls6e ws87\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:733.02795px;\">Other re<span class=\"_ _1\"/>venue<span class=\"_ _233\"> </span>(89)<span class=\"_ _a\"> </span>-<span class=\"_ _5d\"> </span><span class=\"lsa wsf\">273 <span class=\"_ _6b\"> </span></span>-<span class=\"_ _a4\"> </span>184<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:716.0142px;\">Operating r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue</div><div class=\"t m0 hab ff22 fs54 fc0 sc0 ls0 ws0\" style=\"left:80.50484px; bottom:719.3048px;\">2<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:352.21954px; bottom:716.05804px;\">5,240 <span class=\"_ _5a\"> </span>-<span class=\"_ _8c\"> </span>1,722 <span class=\"_ _6b\"> </span>-<span class=\"_ _163\"> </span>6,962<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:701.99854px;\">Production c<span class=\"_ _1\"/>osts<span class=\"_ _21b\"> </span>(489)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _63\"> </span>8 <span class=\"_ _8c\"> </span>(481<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:687.92926px;\">Ro<span class=\"_ _1\"/>yalties, e<span class=\"_ _1\"/>xcise and le<span class=\"_ _1\"/>vies<span class=\"_ _16e\"> </span>(218)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _14a\"> </span>(218<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:673.86005px;\">Insuranc<span class=\"_ _1\"/>e<span class=\"_ _234\"> </span>(32)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _a6\"> </span>1 <span class=\"_ _a4\"> </span>(31<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:659.7908px;\">Inv<span class=\"_ _1\"/>entory mo<span class=\"_ _1\"/>vement<span class=\"_ _235\"> </span>17 <span class=\"_ _6b\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _217\"> </span>17<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:645.72156px;\">Costs of pr<span class=\"_ _1\"/>oduction<span class=\"_ _236\"> </span>(722)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _6b\"> </span>9 <span class=\"_ _13f\"> </span>(713<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:631.6523px;\">Land and buildings<span class=\"_ _1c2\"> </span>(51)<span class=\"_ _78\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _f0\"> </span>(51)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:617.58307px;\">T<span class=\"_ _0\"/>ransferred e<span class=\"_ _1\"/>xplor<span class=\"_ _1\"/>ation and ev<span class=\"_ _1\"/>aluation <span class=\"_ _16f\"> </span>(79)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _a4\"> </span>(79<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:603.5138px;\">Plant and equipment <span class=\"_ _147\"> </span>(1,419)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _143\"> </span>(1,419<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:589.4445px;\">Oil and gas properties depr<span class=\"_ _1\"/>eciation and amortisation<span class=\"_ _166\"> </span>(1,549)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _7\"> </span>(1,549<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:575.385px;\">Shipping and direct sales c<span class=\"_ _1\"/>osts<span class=\"_ _4\"> </span>(197)<span class=\"_ _a\"> </span>-<span class=\"_ _a4\"> </span><span class=\"ls6e ws87\">(45<span class=\"_ _4f\"/>)<span class=\"_ _79\"> </span><span class=\"ls6c ws85\">32 <span class=\"_ _b0\"> </span></span></span>(210)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:561.3158px;\">T<span class=\"_ _0\"/>rading costs<span class=\"_ _237\"> </span>(3)<span class=\"_ _a\"> </span>-<span class=\"_ _103\"> </span>(1,492)<span class=\"_ _a\"> </span>-<span class=\"_ _103\"> </span>(1,495<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:547.2465px;\">Other hy<span class=\"_ _1\"/>drocarbon cos<span class=\"_ _1\"/>ts<span class=\"_ _238\"> </span>(6)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _9d\"> </span>(6)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:533.187px;\">Other cost of sales<span class=\"_ _225\"> </span>(11)<span class=\"_ _78\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _5a\"> </span>(1)<span class=\"_ _107\"> </span>(12<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:519.1178px;\">Mov<span class=\"_ _1\"/>ement in oner<span class=\"_ _1\"/>ous contract pr<span class=\"_ _1\"/>o<span class=\"_ _1\"/><span class=\"_ _2e9\">vision3</span><span class=\"_ _1a7\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _5d\"> </span>140 <span class=\"_ _6b\"> </span>-<span class=\"_ _ab\"> </span>140<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:505.04852px;\">Other cost of sales<span class=\"_ _239\"> </span>(217)<span class=\"_ _a\"> </span>-<span class=\"_ _163\"> </span>(1,397)<span class=\"_ _9f\"> </span>31 <span class=\"_ _17a\"> </span>(1,583)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:488.0348px;\">Cost of sales<span class=\"_ _23a\"> </span><span class=\"ff20 fc1\">(2,488)<span class=\"_ _a\"> </span>-<span class=\"_ _163\"> </span>(1,397)<span class=\"_ _107\"> </span>40 <span class=\"_ _17f\"> </span>(3,845<span class=\"_ _2e9\"> </span></span><span class=\"ff20 fc1\">)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:471.02103px;\">Gross pr<span class=\"_ _1\"/>o\ufb01t/(loss)<span class=\"_ _23b\"> </span><span class=\"ff20 fc1\">2,7<span class=\"_ _1\"/>52 <span class=\"_ _6b\"> </span>-<span class=\"_ _107\"> </span>325 <span class=\"_ _79\"> </span>40 <span class=\"_ _b0\"> </span>3,117<span class=\"_ _2e9\"> </span></span><span class=\"ff20 fc1\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:454.0073px;\">Other income</div><div class=\"t m0 hab ff22 fs54 fc0 sc0 ls0 ws0\" style=\"left:59.24607px; bottom:457.30032px;\">4<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls4 ws8\" style=\"left:364.84448px; bottom:454.05356px;\">97 <span class=\"_ _10b\"> </span><span class=\"ls0 ws0\">(2)<span class=\"_ _5a\"> </span>1 <span class=\"_ _a9\"> </span><span class=\"ls7d ws98\">43 <span class=\"_ _107\"> </span></span>139<span class=\"_ _2e9\"> </span></span><span class=\"ls0 ws0\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:439.9843px;\">Exploration and e<span class=\"_ _1\"/>valua<span class=\"_ _1\"/>tion expenditur<span class=\"_ _1\"/>e<span class=\"_ _1a9\"> </span>(16)<span class=\"_ _a5\"> </span>(27)<span class=\"_ _78\"> </span>-<span class=\"_ _f8\"> </span>(11)<span class=\"_ _142\"> </span>(54<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:425.92484px;\">Amortisation of permit acquisition<span class=\"_ _23c\"> </span>-<span class=\"_ _a1\"> </span>(2)<span class=\"_ _78\"> </span>-<span class=\"_ _5a\"> </span>(1)<span class=\"_ _61\"> </span>(3<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:411.85556px;\">Writ<span class=\"_ _1\"/><span class=\"_ _2e9\">e-offs5</span><span class=\"_ _229\"> </span>-<span class=\"_ _ae\"> </span><span class=\"ls6c ws85\">(265)<span class=\"_ _78\"> </span></span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _ae\"> </span><span class=\"ls6c ws85\">(265<span class=\"_ _2e9\"> </span></span><span class=\"ls6c ws85\">)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:397.78632px;\">Exploration and e<span class=\"_ _1\"/>valua<span class=\"_ _1\"/>tion<span class=\"_ _b\"> </span>(16)<span class=\"_ _163\"> </span>(294)<span class=\"_ _78\"> </span>-<span class=\"_ _f0\"> </span>(12)<span class=\"_ _160\"> </span>(322<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:383.71707px;\">General, administr<span class=\"_ _1\"/>ativ<span class=\"_ _1\"/>e and other costs<span class=\"_ _19\"> </span>(5)<span class=\"_ _a7\"> </span>(1)<span class=\"_ _78\"> </span>-<span class=\"_ _14a\"> </span>(152)<span class=\"_ _9e\"> </span>(158)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:369.64783px;\">Depreciation of other plant and equipment<span class=\"_ _d1\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _5d\"> </span>(30)<span class=\"_ _13f\"> </span>(30<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:355.58832px;\">Depreciation of lease as<span class=\"_ _1\"/>sets<span class=\"_ _23d\"> </span>(28)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _ab\"> </span>(80)<span class=\"_ _ac\"> </span>(108<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:341.51907px;\">Restor<span class=\"_ _1\"/>ation mo<span class=\"_ _1\"/>vement<span class=\"_ _23e\"> </span>(80)<span class=\"_ _f0\"> </span>12 <span class=\"_ _5a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _a4\"> </span>(68<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:327.44983px;\"><span class=\"_ _2e9\">Other6</span><span class=\"_ _202\"> </span>(57)<span class=\"_ _13e\"> </span>(32)<span class=\"_ _a7\"> </span>28 <span class=\"_ _bd\"> </span>(64)<span class=\"_ _b0\"> </span>(125<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:313.39032px;\">Other costs<span class=\"_ _23f\"> </span>(170)<span class=\"_ _107\"> </span>(21)<span class=\"_ _a7\"> </span>28 <span class=\"_ _165\"> </span><span class=\"ls6c ws85\">(326)<span class=\"_ _210\"> </span></span>(489<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:296.37656px;\">Other expenses<span class=\"_ _240\"> </span><span class=\"ff20 fc1\">(186)<span class=\"_ _bd\"> </span>(315)<span class=\"_ _a7\"> </span>28 <span class=\"_ _165\"> </span>(338)<span class=\"_ _13f\"> </span>(811)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:279.36282px;\">Impairment losses<span class=\"_ _1c1\"> </span><span class=\"ff20 fc1\">(10)<span class=\"_ _78\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _10d\"> </span>(10)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:262.34906px;\">Impairment re<span class=\"_ _1\"/>versals<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hab ff22 fs54 fc0 sc0 ls0 ws0\" style=\"left:91.874374px; bottom:265.61844px;\">7<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:262.3717px;\">1,058 <span class=\"_ _5a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _ac\"> </span>1,058<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:245.35794px;\">Pro\ufb01t/(loss<span class=\"_ _1\"/>) before tax and net \ufb01nanc<span class=\"_ _1\"/>e costs<span class=\"_ _87\"> </span><span class=\"ff20 fc1\">3,711 <span class=\"_ _ae\"> </span>(317)<span class=\"_ _140\"> </span>354 <span class=\"_ _ac\"> </span>(255)<span class=\"_ _bc\"> </span><span class=\"ls47 ws82\">3<span class=\"_ _4f\"/>,493<span class=\"_ _2e9\"> </span></span></span><span class=\"ff20 fc1\"><span class=\"ls47 ws82\"> </span></span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:231.81479px;\">1. <span class=\"_ _29\"> </span>Intersegment r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue comprises the incr<span class=\"_ _1\"/>emental income net of all associated e<span class=\"_ _1\"/>xpenses gener<span class=\"_ _1\"/>ated by the Mark<span class=\"_ _1\"/>eting segment\u2019s optimisa<span class=\"_ _1\"/>tion of the oil and gas portfolio.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:220.8948px;\">The v<span class=\"_ _1\"/>alue is incremental income net of incr<span class=\"_ _1\"/>emental costs.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:207.354px;\">2.  Operating re<span class=\"_ _1\"/>venue includes r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue fr<span class=\"_ _1\"/>om contracts with cus<span class=\"_ _1\"/>tomers of $6,923 million and sub-lease income of $3<span class=\"_ _1\"/>9 million disclosed within shipping and other re<span class=\"_ _1\"/>venue.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:193.8132px;\">3.  Comprises pro<span class=\"_ _1\"/>visions used of $45 million and changes in estimates of $95 million. R<span class=\"_ _1\"/>efer to Note D<span class=\"_ _1\"/>.5 for further details.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:180.2724px;\">4.  Includes other inc<span class=\"_ _1\"/>ome of $67 million r<span class=\"_ _1\"/>elating to Pluto v<span class=\"_ _1\"/>olumes deliv<span class=\"_ _1\"/>ered into W<span class=\"_ _1\"/>heatstone\u2019<span class=\"_ _1\"/>s sales commitments and net for<span class=\"_ _1\"/>eign ex<span class=\"_ _1\"/>change gains of $44 million.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:166.7316px;\">5.  $56 million relates t<span class=\"_ _1\"/>o costs of unsucc<span class=\"_ _1\"/>essful wells. $209 million r<span class=\"_ _1\"/>elates t<span class=\"_ _1\"/><span class=\"_ _2e9\">o capitalised costs written off due t</span><span class=\"_ _1\"/>o the Group\u2019<span class=\"_ _1\"/>s decision to withdra<span class=\"_ _1\"/>w from its int<span class=\"_ _1\"/>erests in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:155.8116px;\">Myanmar<span class=\"_ _0\"/>. Refer to Note B.2.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:142.2708px;\">6.  Includes net loss on hedging activities of $91 million, v<span class=\"_ _1\"/>arious costs r<span class=\"_ _1\"/>elating to W<span class=\"_ _0\"/>oodside\u2019s exit fr<span class=\"_ _1\"/>om the Kitimat LNG dev<span class=\"_ _1\"/>elopment of $33 million and other expenses not<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:131.3508px;\">associated with the ongoing oper<span class=\"_ _1\"/>ations of the business.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls8 wsd\" style=\"left:1.8680992px; bottom:117.81px;\">7.<span class=\"_ _4f\"/> <span class=\"_ _16\"> </span><span class=\"ls0 ws0\">Impairment re<span class=\"_ _1\"/>v<span class=\"_ _1\"/>ersals on oil and gas properties. Ref<span class=\"_ _1\"/>er to Note B.4 f<span class=\"_ _1\"/>or more details.<span class=\"_ _2e9\"> </span></span><span class=\"ls0 ws0\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:104.269196px;\">8.  The 2021 amounts ha<span class=\"_ _1\"/>ve been r<span class=\"_ _1\"/>estated t<span class=\"_ _1\"/>o re\ufb02ect the changes in oper<span class=\"_ _1\"/>ating segments and portfolio r<span class=\"_ _1\"/>eporting for LNG re<span class=\"_ _1\"/>venue<span class=\"_ _1\"/>.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">A. Earnings for the y<span class=\"_ _0\"/>ear<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"left:653.27094px; bottom:1.4145012px;\">113<span class=\"_ _49\"/><span class=\"ff1e fc5\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">A.<span class=\"_ _1\"/>1 <span class=\"_ _93\"> </span>Segment r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue and e<span class=\"_ _1\"/>xpenses (<span class=\"_ _1\"/>c<span class=\"_ _1\"/>ont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc4 sc0 ls78 ws90\" style=\"left:325.55576px; bottom:894.49774px;\">Australia<span class=\"_ _b3\"> </span><span class=\"ls79 ws94\">Interna<span class=\"_ _1\"/>tional<span class=\"_ _d4\"> </span><span class=\"ls0 ws0\">Mar<span class=\"_ _4f\"/>ketin<span class=\"_ _4f\"/>g<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hbb ff1f fs4b fc4 sc0 ls7a ws95\" style=\"left:533.7124px; bottom:899.37274px;\">Corpo<span class=\"_ _4f\"/>rate/<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc4 sc0 ls78 ws90\" style=\"left:545.1797px; bottom:889.62274px;\">Other<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc4 sc0 ls7b ws96\" style=\"left:600.6087px; bottom:894.49774px;\">Consolidated<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:349.54126px; bottom:873.72046px;\"><span class=\"_ _2e9\">20206</span><span class=\"_ _5\"> </span><span class=\"_ _2e9\">20206</span><span class=\"_ _5\"> </span><span class=\"_ _2e9\">20206</span><span class=\"_ _165\"> </span><span class=\"_ _2e9\">20206</span><span class=\"_ _143\"> </span>2020<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:349.54126px; bottom:859.65125px;\">US$m<span class=\"_ _5\"> </span>US$m<span class=\"_ _165\"> </span>US$m<span class=\"_ _165\"> </span>US$m<span class=\"_ _5\"> </span>US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:845.582px;\"><span class=\"_ _2e9\">Lique\ufb01ed natural gas1</span><span class=\"_ _241\"> </span>2,390 <span class=\"_ _6b\"> </span>-<span class=\"_ _79\"> </span>129 <span class=\"_ _5a\"> </span>-<span class=\"_ _b0\"> </span>2,519<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:831.51276px;\">Pipeline gas<span class=\"_ _1f8\"> </span><span class=\"lsa wsf\">73<span class=\"_ _4f\"/> <span class=\"_ _5a\"> </span></span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _105\"> </span><span class=\"lsa wsf\">73<span class=\"_ _2e9\"> </span></span><span class=\"lsa wsf\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:817.4435px;\">Crude oil and condensate<span class=\"_ _242\"> </span>843 <span class=\"_ _6b\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _174\"> </span>843<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:803.3742px;\">Natural gas liquids<span class=\"_ _243\"> </span>16 <span class=\"_ _6b\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _106\"> </span>16<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:789.305px;\">Rev<span class=\"_ _1\"/>enue fr<span class=\"_ _1\"/>om sale of hydr<span class=\"_ _1\"/>ocarbons<span class=\"_ _214\"> </span>3,322 <span class=\"_ _5a\"> </span>-<span class=\"_ _a9\"> </span>129 <span class=\"_ _6b\"> </span>-<span class=\"_ _9e\"> </span>3,451<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:775.2357px;\">Intersegment r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/><span class=\"_ _2e9\">enue2</span><span class=\"_ _244\"> </span><span class=\"ls6f ws88\">(47<span class=\"_ _4f\"/>)<span class=\"_ _78\"> </span></span>-<span class=\"_ _a7\"> </span><span class=\"ls6f ws88\">47<span class=\"_ _4f\"/> <span class=\"_ _5a\"> </span></span>-<span class=\"_ _13\"> </span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:761.1665px;\">Proc<span class=\"_ _1\"/>essing and services r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue<span class=\"_ _152\"> </span>142 <span class=\"_ _5a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _79\"> </span>142<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:747.0972px;\">Shipping and other re<span class=\"_ _1\"/>venue<span class=\"_ _232\"> </span>4 <span class=\"_ _6b\"> </span>-<span class=\"_ _6b\"> </span>3 <span class=\"_ _6b\"> </span>-<span class=\"_ _63\"> </span>7<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:733.02795px;\">Other re<span class=\"_ _1\"/>venue<span class=\"_ _227\"> </span>99 <span class=\"_ _5a\"> </span>-<span class=\"_ _10b\"> </span>50 <span class=\"_ _6b\"> </span>-<span class=\"_ _a4\"> </span>149<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:716.0142px;\">Operating r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue<span class=\"_ _245\"> </span><span class=\"ff20 fc1\">3,421 <span class=\"_ _5a\"> </span>-<span class=\"_ _61\"> </span>179 <span class=\"_ _5a\"> </span>-<span class=\"_ _103\"> </span>3,600<span class=\"_ _2e9\"> </span></span><span class=\"ff20 fc1\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:701.9547px;\">Production c<span class=\"_ _1\"/>osts<span class=\"_ _21b\"> </span>(486)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _63\"> </span>8 <span class=\"_ _ac\"> </span><span class=\"ls6f ws88\">(<span class=\"_ _4f\"/>478)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:687.8855px;\">Ro<span class=\"_ _1\"/>yalties, e<span class=\"_ _1\"/>xcise and le<span class=\"_ _1\"/>vies<span class=\"_ _22f\"> </span>(82)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _a4\"> </span>(82)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:673.8162px;\">Insuranc<span class=\"_ _1\"/>e<span class=\"_ _234\"> </span>(32)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _a6\"> </span>1 <span class=\"_ _a4\"> </span>(31)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:659.747px;\">Inv<span class=\"_ _1\"/>entory mo<span class=\"_ _1\"/>vement<span class=\"_ _245\"> </span>(32)<span class=\"_ _78\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _a4\"> </span>(32)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:645.67773px;\">Costs of pr<span class=\"_ _1\"/>oduction<span class=\"_ _23b\"> </span>(632)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _63\"> </span>9 <span class=\"_ _141\"> </span>(623)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:631.60846px;\">Land and buildings<span class=\"_ _246\"> </span>(55)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _79\"> </span>(55)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:617.54895px;\">T<span class=\"_ _0\"/>ransferred e<span class=\"_ _1\"/>xplor<span class=\"_ _1\"/>ation and ev<span class=\"_ _1\"/>aluation <span class=\"_ _15b\"> </span>(99)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _5d\"> </span>(99)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:603.47974px;\">Plant and equipment <span class=\"_ _231\"> </span>(1,535)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _163\"> </span>(1,535)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:589.41046px;\">Oil and gas properties depr<span class=\"_ _1\"/>eciation and amortisation<span class=\"_ _166\"> </span>(1,689)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _7\"> </span>(1,689)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:575.34125px;\">Shipping and direct sales c<span class=\"_ _1\"/>osts<span class=\"_ _14f\"> </span>(146)<span class=\"_ _a\"> </span>-<span class=\"_ _a1\"> </span>(3)<span class=\"_ _a4\"> </span>38 <span class=\"_ _5d\"> </span>(111)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:561.272px;\">T<span class=\"_ _0\"/>rading costs<span class=\"_ _1fc\"> </span><span class=\"ls6e ws87\">(4<span class=\"_ _4f\"/>)<span class=\"_ _a\"> </span></span>-<span class=\"_ _ae\"> </span>(207)<span class=\"_ _a\"> </span>-<span class=\"_ _5d\"> </span>(211)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:547.21246px;\">Other hy<span class=\"_ _1\"/>drocarbon cos<span class=\"_ _1\"/>ts<span class=\"_ _238\"> </span><span class=\"ls6e ws87\">(4)<span class=\"_ _78\"> </span></span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _9d\"> </span><span class=\"ls6e ws87\">(4)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:533.14325px;\">Other cost of sales<span class=\"_ _23a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:519.074px;\">Mov<span class=\"_ _1\"/>ement in oner<span class=\"_ _1\"/>ous contract pr<span class=\"_ _1\"/>o<span class=\"_ _1\"/><span class=\"_ _2e9\">vision3</span><span class=\"_ _1a7\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _ae\"> </span>(347)<span class=\"_ _a\"> </span>-<span class=\"_ _ae\"> </span>(347)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:505.01447px;\">Other cost of sales<span class=\"_ _235\"> </span>(154)<span class=\"_ _a\"> </span>-<span class=\"_ _13f\"> </span>(557)<span class=\"_ _5d\"> </span>38 <span class=\"_ _9e\"> </span>(673)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:488.00073px;\">Cost of sales<span class=\"_ _247\"> </span><span class=\"ff20 fc1\">(2,4<span class=\"_ _1\"/>75)<span class=\"_ _a\"> </span>-<span class=\"_ _13f\"> </span>(557)<span class=\"_ _5d\"> </span><span class=\"ls6f ws88\">47<span class=\"_ _4f\"/> <span class=\"_ _17f\"> </span></span>(2,985)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:470.98697px;\">Gross pr<span class=\"_ _1\"/>o\ufb01t/(loss)<span class=\"_ _248\"> </span><span class=\"ff20 fc1\">946 <span class=\"_ _6b\"> </span>-<span class=\"_ _ae\"> </span>(378)<span class=\"_ _a4\"> </span><span class=\"ls6f ws88\">47<span class=\"_ _4f\"/> <span class=\"_ _174\"> </span></span>615<span class=\"_ _2e9\"> </span></span><span class=\"ff20 fc1\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:453.97324px;\">Other income</div><div class=\"t m0 hab ff22 fs54 fc0 sc0 ls0 ws0\" style=\"left:59.24607px; bottom:457.30032px;\">4<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:369.93542px; bottom:454.05356px;\">3 <span class=\"_ _9d\"> </span>(1)<span class=\"_ _5a\"> </span>1 <span class=\"_ _249\"> </span>(39)<span class=\"_ _142\"> </span>(36)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:439.9843px;\">Exploration and e<span class=\"_ _1\"/>valua<span class=\"_ _1\"/>tion expenditur<span class=\"_ _1\"/>e<span class=\"_ _20c\"> </span>(26)<span class=\"_ _a5\"> </span>(32)<span class=\"_ _78\"> </span>-<span class=\"_ _f8\"> </span>(9)<span class=\"_ _a5\"> </span>(67)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:425.92484px;\">Amortisation of permit acquisition<span class=\"_ _162\"> </span>(6)<span class=\"_ _61\"> </span>(5)<span class=\"_ _78\"> </span>-<span class=\"_ _5a\"> </span>(1)<span class=\"_ _107\"> </span>(12)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:411.85556px;\">Writ<span class=\"_ _1\"/><span class=\"_ _2e9\">e-offs</span><span class=\"_ _24a\"> </span>-<span class=\"_ _a1\"> </span>(2)<span class=\"_ _78\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _9d\"> </span>(2)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:397.78632px;\">Exploration and e<span class=\"_ _1\"/>valua<span class=\"_ _1\"/>tion<span class=\"_ _22f\"> </span>(32)<span class=\"_ _13e\"> </span>(39)<span class=\"_ _a\"> </span>-<span class=\"_ _10d\"> </span>(10)<span class=\"_ _a2\"> </span>(81)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:383.71707px;\">General, administr<span class=\"_ _1\"/>ativ<span class=\"_ _1\"/>e and other costs<span class=\"_ _19\"> </span>(7)<span class=\"_ _107\"> </span>(14)<span class=\"_ _a\"> </span>-<span class=\"_ _a5\"> </span>(169)<span class=\"_ _141\"> </span>(190)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:369.64783px;\">Depreciation of other plant and equipment<span class=\"_ _d1\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _a4\"> </span>(29)<span class=\"_ _13e\"> </span>(29)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:355.58832px;\">Depreciation of lease as<span class=\"_ _1\"/>sets<span class=\"_ _23d\"> </span>(26)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _5d\"> </span>(68)<span class=\"_ _13f\"> </span>(94)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:341.51907px;\">Restor<span class=\"_ _1\"/>ation mo<span class=\"_ _1\"/>vement<span class=\"_ _24b\"> </span>(65)<span class=\"_ _79\"> </span><span class=\"ls16 ws1b\">37 <span class=\"_ _6b\"> </span></span>-<span class=\"_ _13\"> </span>-<span class=\"_ _a4\"> </span>(28)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:327.44983px;\"><span class=\"_ _2e9\">Other4</span><span class=\"_ _206\"> </span>(8)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _f0\"> </span>(51)<span class=\"_ _142\"> </span>(59)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:313.39032px;\">Other costs<span class=\"_ _1b3\"> </span>(106)<span class=\"_ _a4\"> </span>23 <span class=\"_ _6b\"> </span>-<span class=\"_ _14a\"> </span>(317)<span class=\"_ _7\"> </span>(400)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:296.37656px;\">Other expenses<span class=\"_ _24c\"> </span><span class=\"ff20 fc1\">(138)<span class=\"_ _107\"> </span>(16)<span class=\"_ _a\"> </span>-<span class=\"_ _13f\"> </span>(327)<span class=\"_ _9e\"> </span>(481)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:279.36282px;\">Impairment losses</div><div class=\"t m0 hab ff22 fs54 fc0 sc0 ls0 ws0\" style=\"left:79.359146px; bottom:282.6309px;\">5<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:350.76718px; bottom:279.38412px;\">(3,971)<span class=\"_ _b9\"> </span>(1,298)<span class=\"_ _78\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _16c\"> </span>(5,<span class=\"_ _4f\"/>26<span class=\"_ _1\"/>9)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:262.3704px;\">Impairment re<span class=\"_ _1\"/>versals<span class=\"_ _235\"> </span><span class=\"ff20 fc1\">-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:245.35663px;\">Loss befor<span class=\"_ _1\"/>e tax and net \ufb01nance cos<span class=\"_ _1\"/>ts<span class=\"_ _111\"> </span><span class=\"ff20 fc1\">(3,<span class=\"_ _1\"/>160)<span class=\"_ _5\"> </span>(1,315)<span class=\"_ _143\"> </span>(377)<span class=\"_ _9e\"> </span>(319)<span class=\"_ _7\"> </span>(5,<span class=\"_ _1\"/>171)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:231.81479px;\">1. <span class=\"_ _29\"> </span>Includes an adjustment of $113 million r<span class=\"_ _1\"/>elated to price r<span class=\"_ _1\"/>evie<span class=\"_ _1\"/>ws under negotiation f<span class=\"_ _1\"/>or multiple contracts in the A<span class=\"_ _1\"/>ustralia segment, r<span class=\"_ _1\"/>educing re<span class=\"_ _1\"/>venue r<span class=\"_ _1\"/>ecognised in the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:220.8948px;\">current and prior periods and incr<span class=\"_ _1\"/>easing other liabilities.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:207.354px;\">2.  Intersegment re<span class=\"_ _1\"/>venue c<span class=\"_ _1\"/>omprises the incremental income net of all as<span class=\"_ _1\"/>sociated e<span class=\"_ _1\"/>xpenses generated b<span class=\"_ _1\"/>y the Marketing segment\u2019<span class=\"_ _1\"/>s optimisation of the oil and gas portfolio<span class=\"_ _1\"/>.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:196.434px;\">The v<span class=\"_ _1\"/>alue is incremental income net of incr<span class=\"_ _1\"/>emental costs.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:182.8932px;\">3.  Comprised of the recognition of an oner<span class=\"_ _1\"/>ous contr<span class=\"_ _1\"/>act pro<span class=\"_ _1\"/><span class=\"_ _2e9\">vision $447 million, offse</span><span class=\"_ _1\"/>t by changes in estimat<span class=\"_ _1\"/>es of $54 million, pro<span class=\"_ _1\"/>visions used of $41 million and a r<span class=\"_ _1\"/>evision of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:171.9732px;\">discount r<span class=\"_ _1\"/>ates of $5 million.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:158.4324px;\">4.  Includes f<span class=\"_ _1\"/>oreign e<span class=\"_ _1\"/>xchange gains and los<span class=\"_ _1\"/>ses, gains and losses on hedging activities, cancellation cos<span class=\"_ _1\"/>ts and other expenses not associat<span class=\"_ _1\"/>ed with the ongoing operations of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:147.5124px;\">the business.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:133.9716px;\">5.  The impairment losses repr<span class=\"_ _1\"/>esent charges on e<span class=\"_ _1\"/>xplor<span class=\"_ _1\"/>ation and ev<span class=\"_ _1\"/>aluation of $1,55<span class=\"_ _1\"/>7 million and oil and gas properties of $3,712 million.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:120.4308px;\">6.  The 20<span class=\"_ _1\"/>20 amounts hav<span class=\"_ _1\"/>e been restat<span class=\"_ _1\"/>ed to r<span class=\"_ _1\"/>e\ufb02ect the changes in operating segments and portfolio r<span class=\"_ _1\"/>eporting for LNG r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>enue.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">A. Earnings for the y<span class=\"_ _0\"/>ear<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">114<span class=\"_ _93\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">A.2 <span class=\"_ _fd\"> </span>Finance c<span class=\"_ _1\"/>osts<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:194.52432px; bottom:897.40753px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _b1\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _be\"> </span>2020<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:189.8013px; bottom:880.3938px;\">US$m<span class=\"_ _54\"> </span><span class=\"ff20\">US$m<span class=\"_ _db\"> </span>US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:863.38px;\">Inter<span class=\"_ _1\"/>est on inter<span class=\"_ _1\"/>est-bearing liabilities<span class=\"_ _9e\"> </span><span class=\"ff1f\">212 <span class=\"_ _f4\"> </span></span>201 <span class=\"_ _d8\"> </span>237 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:849.3108px;\">Inter<span class=\"_ _1\"/>est on lease liabilities<span class=\"_ _6\"> </span><span class=\"ff1f\">103 <span class=\"_ _95\"> </span></span><span class=\"ls4 ws8\">97 <span class=\"_ _176\"> </span></span>86 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:835.2415px;\">Accr<span class=\"_ _1\"/>etion char<span class=\"_ _1\"/>ge<span class=\"_ _1f\"> </span><span class=\"ff1f\">110 <span class=\"_ _15f\"> </span></span>29 <span class=\"_ _15e\"> </span><span class=\"ls6c ws85\">32 </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:821.17224px;\">Other \ufb01nance cos<span class=\"_ _1\"/>ts<span class=\"_ _e9\"> </span><span class=\"ff1f\">36 <span class=\"_ _15e\"> </span></span><span class=\"ls6c ws85\">26 <span class=\"_ _15e\"> </span></span>29 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:805.153px;\">Less: Finance c<span class=\"_ _1\"/>osts capitalised </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:795.403px;\">against qualifying assets<span class=\"_ _194\"> </span><span class=\"ff1f\">(294)<span class=\"_ _d7\"> </span></span>(123)<span class=\"_ _c0\"> </span>(5<span class=\"_ _1\"/>7)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:201.23648px; bottom:781.33374px;\">167 <span class=\"_ _b1\"> </span><span class=\"ff20\">230 <span class=\"_ _c0\"> </span><span class=\"ls47 ws82\">327 </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:742.73016px;\">A.3 <span class=\"_ _fd\"> </span>Dividends paid and proposed<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:719.75995px;\">Woodside Energy Group Ltd, the parent entity, paid and </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:704.1638px;\">proposed dividends set out below:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:194.52432px; bottom:681.448px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _b1\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _e1\"> </span>2020<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:189.8013px; bottom:667.3788px;\">US$m<span class=\"_ _54\"> </span><span class=\"ff20\">US$m<span class=\"_ _d9\"> </span>US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:650.365px;\">(a) Dividends paid during the \ufb01nancial </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:640.615px;\">year<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:626.5458px;\">Prior year fully fr<span class=\"_ _1\"/>anked \ufb01nal </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:616.7958px;\"><span class=\"_ _2e9\">dividend1</span><span class=\"_ _1ac\"> </span><span class=\"ff1f\">1,018 <span class=\"_ _15e\"> </span></span>115 <span class=\"_ _b4\"> </span>518 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:602.7265px;\">Current y<span class=\"_ _1\"/>ear fully frank<span class=\"_ _1\"/>ed interim </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:592.9765px;\"><span class=\"_ _2e9\">dividend2</span><span class=\"_ _fb\"> </span><span class=\"ff1f\">2,<span class=\"_ _1\"/>07<span class=\"_ _1\"/>0 <span class=\"_ _c0\"> </span><span class=\"ff20\">289 <span class=\"_ _c0\"> </span>248 </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:191.31853px; bottom:578.917px;\">3,088 <span class=\"_ _b6\"> </span><span class=\"ff20\">404 <span class=\"_ _c0\"> </span>766 </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:561.90326px;\">(b) Dividend declar<span class=\"_ _1\"/>ed subsequent to </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:552.15326px;\">the reporting period (not r<span class=\"_ _1\"/>ecorded as </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:542.40326px;\">a liability)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:528.34375px;\"><span class=\"_ _2e9\">Final dividend3</span><span class=\"_ _5e\"> </span><span class=\"ff1f lsa wsf\">2,734<span class=\"_ _d8\"> </span></span>1,018 <span class=\"_ _15e\"> </span>115 </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:511.33002px;\">(c<span class=\"_ _1\"/>) Other information<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:497.26074px;\">Franking cr<span class=\"_ _1\"/>edits av<span class=\"_ _1\"/>ailable for </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:487.51074px;\">subsequent periods<span class=\"_ _117\"> </span><span class=\"ff1f\">1,406 <span class=\"_ _f5\"> </span></span>1,7<span class=\"_ _1\"/>44 <span class=\"_ _f5\"> </span>1,823 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:473.4415px;\">Current y<span class=\"_ _1\"/>ear dividends per share (US </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:463.6915px;\">cents)<span class=\"_ _24d\"> </span><span class=\"ff1f ls6a ws83\">253<span class=\"_ _15f\"> </span></span>135 <span class=\"_ _95\"> </span>38 </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:450.16476px;\">1. <span class=\"_ _29\"> </span>2022: US$1.05, paid on 23 Mar<span class=\"_ _1\"/>ch 2022  </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:439.24475px;\">2021: US$0.<span class=\"_ _1\"/>12, paid on 2<span class=\"_ _1\"/>4 March 2021 </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:428.32474px;\">2020: US$0.55, paid on 20 Mar<span class=\"_ _1\"/>ch 2020<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:414.78394px;\">2.  2022: US$1.09, paid on 6 October 20<span class=\"_ _1\"/>22  </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:403.86395px;\">2021: US$0.30, paid on 2<span class=\"_ _1\"/>4 September 20<span class=\"_ _1\"/>21 </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:392.94394px;\">2020: US$0.26, paid on 18 September 20<span class=\"_ _1\"/>20<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:379.40314px;\">3.  2022: US$1.44, to be paid on 5 April 2023 </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:368.48315px;\">2021: US$1.05, paid on 23 Mar<span class=\"_ _1\"/>ch 2022 </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:357.56314px;\">2020: US$0.<span class=\"_ _1\"/>12, paid on 2<span class=\"_ _1\"/>4 March 2021<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:340.1135px;\">The Dividend Reinvestment Plan (DRP) was approved by </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:324.5174px;\">the shareholders at the Annual General Meeting in 2003 for </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:308.9213px;\">activation as required to fund future growth. The DRP was </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:293.3252px;\">reactivated in 2019 and suspended by the Board of Directors  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:277.7291px;\">on 27 February 2023. </div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"left:342.73032px; bottom:927.4895px;\">A.4 <span class=\"_ _27\"> </span>Earnings/(losses<span class=\"_ _1\"/>) per share<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:508.75317px; bottom:894.45953px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _7\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _189\"> </span>2020<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:880.39026px;\">Pro\ufb01t/(loss<span class=\"_ _1\"/>) attributable to </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:870.64026px;\">equity holders of the parent </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:860.89026px;\">(US$m)<span class=\"_ _221\"> </span><span class=\"ff1f\">6,4<span class=\"_ _1\"/>98 <span class=\"_ _c7\"> </span><span class=\"ff20\">1,983 <span class=\"_ _c2\"> </span>(4,028)<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:846.821px;\">W<span class=\"_ _1\"/>eighted a<span class=\"_ _1\"/>ver<span class=\"_ _1\"/>age number </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:837.071px;\">of shares on issue f<span class=\"_ _1\"/>or basic </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:827.321px;\">earnings/(loss) per shar<span class=\"_ _1\"/>e <span class=\"_ _54\"> </span><span class=\"ff1f\">1,511,257<span class=\"_ _0\"/>,404 <span class=\"_ _4d\"> </span><span class=\"ff20\">962,604,811 <span class=\"_ _180\"> </span>951,113,<span class=\"_ _1\"/>086 </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:813.2518px;\"><span class=\"_ _2e9\">Effect of dilution fr</span><span class=\"_ _1\"/>om </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:803.5018px;\">contingently issuable shar<span class=\"_ _1\"/>es<span class=\"_ _e0\"> </span><span class=\"ff1f\">13,061,37<span class=\"_ _1\"/>6 <span class=\"_ _181\"> </span><span class=\"ff20\">9,023,<span class=\"_ _1\"/>439 <span class=\"_ _a4\"> </span>-<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:789.4325px;\">W<span class=\"_ _1\"/>eighted a<span class=\"_ _1\"/>ver<span class=\"_ _1\"/>age number of </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:779.6825px;\">shares on issue adjus<span class=\"_ _1\"/>ted for </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:769.9325px;\"><span class=\"_ _2e9\">the effect of dilution1</span><span class=\"_ _c7\"> </span><span class=\"ff1f\">1,524,318,7<span class=\"_ _1\"/>80 <span class=\"_ _184\"> </span><span class=\"ff20\">971,628,250 <span class=\"_ _180\"> </span>951,113,<span class=\"_ _1\"/>086 </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:755.8633px;\">Basic earnings/(losses) per </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:746.1133px;\">share (US cents<span class=\"_ _1\"/>)<span class=\"_ _129\"> </span><span class=\"fc1 ls1c ws22\">430.0<span class=\"_ _4f\"/> <span class=\"_ _176\"> </span></span><span class=\"ff20 fc1\"> 206.0 <span class=\"_ _b4\"> </span>(<span class=\"_ _1\"/>423.5)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:729.0995px;\">Diluted earnings/(losses<span class=\"_ _1\"/>) </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:719.3495px;\">per share (US cents<span class=\"_ _1\"/>)<span class=\"_ _6a\"> </span><span class=\"fc1 ls6c ws85\">426.3 <span class=\"_ _188\"> </span></span><span class=\"ff20 fc1\"> 204.1 <span class=\"_ _f4\"> </span>(423.5)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:705.83px;\">1. <span class=\"_ _29\"> </span>The contingently is<span class=\"_ _1\"/>suable shares in 2020 ha<span class=\"_ _1\"/>ve an anti-dilutiv<span class=\"_ _1\"/>e impact. </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:677.3326px;\">Earnings/(losses) per share is calculated by dividing the pro\ufb01t/<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:661.7365px;\">(loss) for the year attributable to ordinary equity holders of the </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:646.1404px;\">parent by the weighted average number of ordinary shares on </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:630.5443px;\">issue during the year. The weighted average number of shares </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:614.9482px;\">makes allowance for shares reserved for employee share plans. </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:599.3521px;\">Diluted earnings/(losses) per share is calculated by adjusting </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:583.756px;\">basic earnings/(losses) per share by the number of ordinary </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:568.1599px;\">shares that would be issued on conversion of all the dilutive </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:552.5638px;\">potential ordinary shares into ordinary shares. At 31 December </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:536.9677px;\">2022, 13,061,376 awards (2021: 9,023,439 awards) granted under </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:521.3716px;\">the Woodside employee share plans are considered dilutive. </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:505.7755px;\">Total outstanding share awards as at 31 December 2020 were </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:490.17938px;\">9,392,203 and considered anti-dilutive due to the loss position </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:474.5833px;\">in 2020. </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:451.6162px;\">There have been no signi\ufb01cant transactions involving ordinary </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:436.0201px;\">shares between the reporting date and the date of completion  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:420.424px;\">of these \ufb01nancial statements.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">A. Earnings for the y<span class=\"_ _0\"/>ear<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"left:653.27094px; bottom:1.4145012px;\">115<span class=\"_ _49\"/><span class=\"ff1e fc5\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:212.68207px; bottom:901.99744px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _d4\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _e2\"> </span>2020<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:208.7388px; bottom:888.72766px;\">US$m<span class=\"_ _182\"> </span><span class=\"ff20\">US$m<span class=\"_ _53\"> </span>US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:876.0137px;\">(a) T<span class=\"_ _0\"/>ax expense comprises<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:862.74396px;\">Petroleum r<span class=\"_ _1\"/>esourc<span class=\"_ _1\"/>e rent tax (PRR<span class=\"_ _1\"/>T)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:849.4742px;\">Current tax e<span class=\"_ _1\"/>xpense<span class=\"_ _199\"> </span><span class=\"ff1f\">501 <span class=\"_ _102\"> </span></span>-<span class=\"_ _15f\"> </span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:836.2044px;\">Deferred tax (bene\ufb01t)/<span class=\"_ _0\"/>expense<span class=\"_ _82\"> </span><span class=\"ff1f\">(814)<span class=\"_ _dc\"> </span></span>297 <span class=\"_ _e2\"> </span><span class=\"ls6e ws87\">(439)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:822.9347px;\">PRRT (bene\ufb01t)/<span class=\"_ _0\"/>expense<span class=\"_ _34\"> </span><span class=\"ff1f\">(313)<span class=\"_ _dc\"> </span></span>297 <span class=\"_ _df\"> </span><span class=\"ls6e ws87\">(4<span class=\"_ _4f\"/>39)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:809.6649px;\">Income tax<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:796.3952px;\">Current y<span class=\"_ _1\"/>ear<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:783.1254px;\">Current tax e<span class=\"_ _1\"/>xpense<span class=\"_ _30\"> </span><span class=\"ff1f\">2,256 <span class=\"_ _181\"> </span></span>658 <span class=\"_ _db\"> </span><span class=\"ls72 ws8b\">275<span class=\"_ _2e9\"> </span></span><span class=\"ls72 ws8b\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:769.85565px;\">Deferred tax e<span class=\"_ _1\"/>xpense/(bene\ufb01t)<span class=\"_ _23\"> </span><span class=\"ff1f ls70 ws89\">701<span class=\"_ _4f\"/> <span class=\"_ _d6\"> </span></span>301 <span class=\"_ _184\"> </span>(1,308)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:756.58594px;\">Adjustment t<span class=\"_ _1\"/>o prior years<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:743.31616px;\">Current tax (bene\ufb01t)/<span class=\"_ _0\"/>expense<span class=\"_ _71\"> </span><span class=\"ff1f\">(276)<span class=\"_ _c4\"> </span></span>(20)<span class=\"_ _c3\"> </span>16<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:730.04645px;\">Deferred tax e<span class=\"_ _1\"/>xpense/(bene\ufb01t)<span class=\"_ _71\"> </span><span class=\"ff1f\">231 <span class=\"_ _c3\"> </span></span>18 <span class=\"_ _e3\"> </span>(9)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:716.7767px;\">Income tax e<span class=\"_ _1\"/>xpense/(bene\ufb01t)<span class=\"_ _ef\"> </span><span class=\"ff1f\">2,912 <span class=\"_ _d5\"> </span></span><span class=\"ls7e ws99\">9<span class=\"_ _4f\"/>57 <span class=\"_ _184\"> </span></span>(1,026)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:703.50696px;\">T<span class=\"_ _0\"/>ax expense/(bene\ufb01t)<span class=\"_ _113\"> </span><span class=\"fc1\">2,599 <span class=\"_ _c1\"> </span><span class=\"ff20\">1,254 <span class=\"_ _183\"> </span>(1,465)<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:690.2372px;\">(b) R<span class=\"_ _1\"/>econciliation of income tax e<span class=\"_ _1\"/>xpense<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:676.9674px;\">Pro\ufb01t/(loss<span class=\"_ _1\"/>) befor<span class=\"_ _1\"/>e tax<span class=\"_ _26\"> </span><span class=\"ff1f\">9,17<span class=\"_ _0\"/>4 <span class=\"_ _184\"> </span><span class=\"ff20\">3,290 <span class=\"_ _17\"> </span>(5,440)<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:663.6977px;\">PRRT bene\ufb01t/(e<span class=\"_ _1\"/>xpense<span class=\"_ _1\"/>)<span class=\"_ _1a3\"> </span><span class=\"ff1f\">313 <span class=\"_ _af\"> </span></span>(297)<span class=\"_ _c4\"> </span><span class=\"ls6a ws83\">439<span class=\"_ _2e9\"> </span></span><span class=\"ls6a ws83\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:650.4279px;\">Pro\ufb01t/(loss<span class=\"_ _1\"/>) befor<span class=\"_ _1\"/>e income tax<span class=\"_ _16a\"> </span><span class=\"ff1f\">9,487 <span class=\"_ _183\"> </span></span>2,993 <span class=\"_ _de\"> </span>(5,001)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws1d\" style=\"left:1.8680992px; bottom:637.1582px;\">Income tax e<span class=\"_ _1\"/>xpense/(bene\ufb01t) calculated at 30%<span class=\"_ _17\"> </span><span class=\"ff1f ws0\">2,847 <span class=\"_ _dc\"> </span><span class=\"ff20\">898 <span class=\"_ _de\"> </span>(1,500)<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:623.8884px;\"><span class=\"_ _2e9\">Effect of tax r</span><span class=\"_ _1\"/><span class=\"_ _2e9\">ate differ</span><span class=\"_ _1\"/>entials<span class=\"_ _191\"> </span><span class=\"ff1f\">(141)<span class=\"_ _d5\"> </span></span><span class=\"ls6e ws87\">(42)<span class=\"_ _f6\"> </span></span>192<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:610.61865px;\"><span class=\"_ _2e9\">Effect of deferr</span><span class=\"_ _1\"/>ed tax assets not r<span class=\"_ _1\"/>ecognised<span class=\"_ _dd\"> </span><span class=\"ff1f\">150 <span class=\"_ _54\"> </span></span>114 <span class=\"_ _d6\"> </span><span class=\"ls72 ws8b\">270<span class=\"_ _2e9\"> </span></span><span class=\"ls72 ws8b\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:599.1332px;\">For<span class=\"_ _1\"/>eign ex<span class=\"_ _1\"/>change impact on tax (bene\ufb01t)/<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:589.3832px;\">expense<span class=\"_ _24e\"> </span><span class=\"ff1f\">(44)<span class=\"_ _f6\"> </span></span>(18)<span class=\"_ _d8\"> </span>3<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:576.1134px;\">Adjustment t<span class=\"_ _1\"/>o prior years<span class=\"_ _10a\"> </span><span class=\"ff1f ls6e ws87\">(4<span class=\"_ _4f\"/>5)<span class=\"_ _f5\"> </span></span>(2)<span class=\"_ _c0\"> </span>7<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:564.6279px;\">Integr<span class=\"_ _1\"/>ation and transaction c<span class=\"_ _1\"/>osts non-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:554.8779px;\">deductible<span class=\"_ _24f\"> </span><span class=\"ff1f\">142 <span class=\"_ _102\"> </span></span>-<span class=\"_ _95\"> </span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:541.60815px;\">Other<span class=\"_ _36\"> </span><span class=\"ff1f\">3 <span class=\"_ _c0\"> </span></span>7 <span class=\"_ _c2\"> </span>2<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:528.33844px;\">Income tax e<span class=\"_ _1\"/>xpense/(bene\ufb01t)<span class=\"_ _14b\"> </span><span class=\"fc1\">2,912 <span class=\"_ _181\"> </span><span class=\"ff20 ls7e ws99\">9<span class=\"_ _4f\"/>57 <span class=\"_ _183\"> </span></span><span class=\"ff20\">(1,026)<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:515.06866px;\">(c<span class=\"_ _1\"/>) Reconciliation of PRRT bene\ufb01t<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:501.79895px;\">Pro\ufb01t/(loss<span class=\"_ _1\"/>) befor<span class=\"_ _1\"/>e tax<span class=\"_ _26\"> </span><span class=\"ff1f\">9,17<span class=\"_ _0\"/>4 <span class=\"_ _184\"> </span><span class=\"ff20\">3,290 <span class=\"_ _17\"> </span>(5,440)<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:488.52917px;\">Non-PRRT assessable (pr<span class=\"_ _1\"/>o\ufb01t)/loss<span class=\"_ _6b\"> </span><span class=\"ff1f\">(6,197)<span class=\"_ _52\"> </span></span>(2,134)<span class=\"_ _148\"> </span>3,080<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:475.25943px;\">PRRT projec<span class=\"_ _1\"/>ts pro\ufb01t/(loss<span class=\"_ _1\"/>) before tax<span class=\"_ _14a\"> </span><span class=\"ff1f\">2,977 <span class=\"_ _e2\"> </span></span>1,156 <span class=\"_ _41\"> </span>(2,360)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:461.9897px;\">PRRT e<span class=\"_ _1\"/>xpense/(bene\ufb01t) calculated at 40%<span class=\"_ _188\"> </span><span class=\"ff1f\">1,<span class=\"_ _1\"/>191 <span class=\"_ _dc\"> </span><span class=\"ff20\">462 <span class=\"_ _df\"> </span>(944)<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:450.50418px;\">(Recognition)/<span class=\"_ _0\"/>derecognition of Pluto gener<span class=\"_ _1\"/>al<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:440.75418px;\">expenditur<span class=\"_ _1\"/><span class=\"_ _2e9\">e1</span><span class=\"_ _68\"> </span><span class=\"ff1f\">(1,362)<span class=\"_ _c0\"> </span></span>-<span class=\"_ _54\"> </span><span class=\"ls47 ws82\">627<span class=\"_ _4f\"/> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:427.48444px;\">Augmentation<span class=\"_ _1ac\"> </span><span class=\"ff1f\">(175)<span class=\"_ _df\"> </span></span>(166)<span class=\"_ _d4\"> </span>(138)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:414.2147px;\">Other<span class=\"_ _250\"> </span><span class=\"ff1f\">33 <span class=\"_ _f4\"> </span></span>1 <span class=\"_ _d7\"> </span>16<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:400.94492px;\">PRRT (bene\ufb01t)/<span class=\"_ _0\"/>expense<span class=\"_ _10a\"> </span><span class=\"fc1\">(313)<span class=\"_ _dc\"> </span><span class=\"ff20\">297 <span class=\"_ _e2\"> </span><span class=\"ls6e ws87\">(43<span class=\"_ _4f\"/>9)<span class=\"_ _2e9\"> </span></span></span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:389.45944px;\">(d) Def<span class=\"_ _1\"/>erred tax income sta<span class=\"_ _1\"/>tement<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:379.70944px;\">reconcilia<span class=\"_ _1\"/>tion<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:366.43967px;\">PRRT<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:353.16992px;\">Production and gr<span class=\"_ _1\"/>owth as<span class=\"_ _1\"/>sets<span class=\"_ _16a\"> </span><span class=\"ff1f\">(710)<span class=\"_ _d4\"> </span></span><span class=\"ls7d ws98\">455 <span class=\"_ _c5\"> </span></span>(24<span class=\"_ _1\"/>2)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:339.90018px;\">Augmentation for curr<span class=\"_ _1\"/>ent y<span class=\"_ _1\"/>ear<span class=\"_ _23\"> </span><span class=\"ff1f\">(175)<span class=\"_ _df\"> </span></span>(166)<span class=\"_ _d4\"> </span>(138)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:326.63043px;\">Pro<span class=\"_ _1\"/>visions<span class=\"_ _251\"> </span><span class=\"ff1f\">(12)<span class=\"_ _181\"> </span></span>(29)<span class=\"_ _db\"> </span>(32)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:313.3607px;\">Other<span class=\"_ _43\"> </span><span class=\"ff1f\">83 <span class=\"_ _f5\"> </span></span><span class=\"ls16 ws1b\">37 <span class=\"_ _54\"> </span></span>(27)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:300.09094px;\">PRRT (bene\ufb01t)/<span class=\"_ _0\"/>expense<span class=\"_ _212\"> </span><span class=\"ff1f\">(814)<span class=\"_ _dc\"> </span></span>297 <span class=\"_ _e2\"> </span><span class=\"ls6e ws87\">(439)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:286.82117px;\">Income tax<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:273.55142px;\">Oil and gas properties<span class=\"_ _30\"> </span><span class=\"ff1f\">292 <span class=\"_ _d5\"> </span></span><span class=\"ls7f ws9a\">6<span class=\"_ _4f\"/>74<span class=\"_ _50\"/> <span class=\"_ _c4\"> </span></span>(981)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:260.28168px;\">Exploration and e<span class=\"_ _1\"/>valua<span class=\"_ _1\"/>tion assets<span class=\"_ _82\"> </span><span class=\"ff1f\">14 <span class=\"_ _e5\"> </span></span>(204)<span class=\"_ _c5\"> </span>(210)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:247.01193px;\">Lease assets and liabilities<span class=\"_ _252\"> </span><span class=\"ff1f\">25 <span class=\"_ _f4\"> </span></span>1 <span class=\"_ _c6\"> </span>(16)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:233.74219px;\">Pro<span class=\"_ _1\"/>visions<span class=\"_ _253\"> </span><span class=\"ff1f\">151 <span class=\"_ _d9\"> </span></span>(10)<span class=\"_ _e2\"> </span>(106)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:220.47244px;\">PRRT assets and liabilities<span class=\"_ _115\"> </span><span class=\"ff1f\">236 <span class=\"_ _b3\"> </span></span>(88)<span class=\"_ _db\"> </span>134<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:207.20268px;\">Unused tax losses and tax credits<span class=\"_ _173\"> </span><span class=\"ff1f\">19 <span class=\"_ _b3\"> </span></span>149 <span class=\"_ _c4\"> </span>(149)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:193.93292px;\">Assets held for sale<span class=\"_ _2a\"> </span><span class=\"ff1f\">205 <span class=\"_ _f9\"> </span></span>(205)<span class=\"_ _c2\"> </span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:180.66318px;\">Derivativ<span class=\"_ _1\"/>es<span class=\"_ _251\"> </span><span class=\"ff1f\">21 <span class=\"_ _b2\"> </span></span>(11)<span class=\"_ _c3\"> </span>16<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:167.39343px;\">Other<span class=\"_ _39\"> </span><span class=\"ff1f\">(31)<span class=\"_ _b2\"> </span></span>13 <span class=\"_ _e3\"> </span>(5)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:154.12367px;\">Income tax deferr<span class=\"_ _1\"/>ed tax expense/(bene\ufb01t)<span class=\"_ _189\"> </span><span class=\"ff1f ls47 ws82\">932<span class=\"_ _4f\"/> <span class=\"_ _db\"> </span></span>319 <span class=\"_ _e5\"> </span>(1,317)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:140.85393px;\">Deferred tax e<span class=\"_ _1\"/>xpense/(bene\ufb01t)<span class=\"_ _74\"> </span><span class=\"fc1\">118 <span class=\"_ _db\"> </span><span class=\"ff20\">616 <span class=\"_ _182\"> </span>(1,756)<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:129.36842px;\">(e<span class=\"_ _1\"/>) Deferred tax other c<span class=\"_ _1\"/>omprehensiv<span class=\"_ _1\"/>e income<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:119.61842px;\">reconcilia<span class=\"_ _1\"/>tion<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:106.34868px;\">Income tax<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:93.07893px;\">Derivativ<span class=\"_ _1\"/>es<span class=\"_ _213\"> </span><span class=\"ff1f\">(64)<span class=\"_ _b1\"> </span></span>5 <span class=\"_ _d9\"> </span>(25)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:79.80918px;\">Other<span class=\"_ _1b\"> </span><span class=\"ff1f\">(2)<span class=\"_ _b1\"> </span></span>5 <span class=\"_ _bf\"> </span>6<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:68.32368px;\">Deferred inc<span class=\"_ _1\"/>ome tax (bene\ufb01t)/<span class=\"_ _1\"/>e<span class=\"_ _1\"/>xpense via<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:58.573677px;\">other comprehensiv<span class=\"_ _1\"/>e income<span class=\"_ _c9\"> </span><span class=\"fc1\">(66)<span class=\"_ _be\"> </span><span class=\"ff20\">10 <span class=\"_ _c6\"> </span>(19)<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws9b\" style=\"bottom:927.4895px;\">A.5 T<span class=\"_ _2\"/>ax<span class=\"_ _1\"/>es<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">A. Earnings for the y<span class=\"_ _0\"/>ear<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:555.1983px; bottom:900.5234px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _dc\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _df\"> </span>2020<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:569.52386px; bottom:885.7814px;\">%<span class=\"_ _c0\"> </span><span class=\"ff20\">%<span class=\"_ _f4\"> </span>%<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:874.29584px;\"><span class=\"_ _2e9\">(f) Effective income tax r</span><span class=\"_ _1\"/>ate: A<span class=\"_ _1\"/>ustralian and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:864.54584px;\">global operations<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:850.4766px;\"><span class=\"_ _2e9\">Effectiv</span><span class=\"_ _1\"/>e income tax r<span class=\"_ _1\"/><span class=\"_ _2e9\">ate2<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:836.40735px;\">Austr<span class=\"_ _1\"/>alia<span class=\"_ _f1\"> </span><span class=\"ff1f ls1c ws22\">30.0<span class=\"_ _4f\"/>%<span class=\"_ _183\"> </span></span>30.6%<span class=\"_ _180\"> </span>29.6%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:822.34784px;\">Global<span class=\"_ _42\"> </span><span class=\"ff1f\">30.7%<span class=\"_ _182\"> </span></span>32.0%<span class=\"_ _180\"> </span>20.5%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:800.4698px;\">1. <span class=\"_ _29\"> </span>The $1,362 million incr<span class=\"_ _1\"/>ease of the Pluto PRRT deferr<span class=\"_ _1\"/>ed tax asset is due to the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:789.54974px;\">rec<span class=\"_ _1\"/>ognition of pre<span class=\"_ _1\"/>viously unrecognised deductible e<span class=\"_ _1\"/>xpenditure tha<span class=\"_ _1\"/>t is now<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:778.62976px;\">expect<span class=\"_ _1\"/><span class=\"_ _2e9\">ed to be utilised to offset futur</span><span class=\"_ _1\"/>e taxable pr<span class=\"_ _1\"/><span class=\"_ _2e9\">o\ufb01ts. </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:767.3185px;\"><span class=\"_ _2e9\">2.  The global operations effectiv</span><span class=\"_ _1\"/>e income tax r<span class=\"_ _1\"/>ate (ETR) is calculat<span class=\"_ _1\"/>ed as the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:756.3985px;\">Group\u2019<span class=\"_ _1\"/>s income tax e<span class=\"_ _1\"/>xpense divided by pr<span class=\"_ _1\"/>o\ufb01t before inc<span class=\"_ _1\"/>ome tax. The Austr<span class=\"_ _1\"/>alian<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:745.47845px;\">operations ETR is calculat<span class=\"_ _1\"/>ed with refer<span class=\"_ _1\"/>ence t<span class=\"_ _1\"/>o all Australian c<span class=\"_ _1\"/>ompanies and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:734.5585px;\">ex<span class=\"_ _1\"/>cludes for<span class=\"_ _1\"/>eign ex<span class=\"_ _1\"/>change on settlement and r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>aluation of income tax<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:723.6385px;\">liabilities.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:555.1983px; bottom:687.74756px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _dc\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:551.60236px; bottom:673.00555px;\">US$m<span class=\"_ _182\"> </span><span class=\"ff20\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:658.26355px;\">(g) Def<span class=\"_ _1\"/>erred tax balance sheet r<span class=\"_ _1\"/>econciliation<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:644.1943px;\">Deferred tax as<span class=\"_ _1\"/>sets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:630.12506px;\">PRRT<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:616.0558px;\">Production and gr<span class=\"_ _1\"/>owth as<span class=\"_ _1\"/>sets<span class=\"_ _173\"> </span><span class=\"ff1f\">1,460 <span class=\"_ _f7\"> </span></span><span class=\"ls4 ws8\">767<span class=\"_ _4f\"/> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:601.9866px;\">Augmentation for curr<span class=\"_ _1\"/>ent y<span class=\"_ _1\"/>ear<span class=\"_ _18e\"> </span><span class=\"ff1f\">113 <span class=\"_ _db\"> </span></span>166<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:587.9173px;\">Pro<span class=\"_ _1\"/>visions<span class=\"_ _76\"> </span><span class=\"ff1f ls2b ws32\">271 <span class=\"_ _f5\"> </span></span><span class=\"ls72 ws8b\">75<span class=\"_ _2e9\"> </span></span><span class=\"ls72 ws8b\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:573.8578px;\">Other<span class=\"_ _254\"> </span><span class=\"ff1f\">(23)<span class=\"_ _e3\"> </span></span>(1)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:559.7886px;\">PRRT deferr<span class=\"_ _1\"/>ed tax assets<span class=\"_ _8f\"> </span><span class=\"ff1f\">1,821 <span class=\"_ _180\"> </span></span>1,007<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:548.30304px;\"><span class=\"_ _2e9\">Income tax3<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:536.81757px;\">Oil and gas properties<span class=\"_ _1aa\"> </span><span class=\"ff1f\">(1,496)<span class=\"_ _c0\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:525.33203px;\">Exploration and e<span class=\"_ _1\"/>valua<span class=\"_ _1\"/>tion assets<span class=\"_ _6a\"> </span><span class=\"ff1f\">30 <span class=\"_ _c2\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:513.84656px;\">Lease assets and liabilities<span class=\"_ _1aa\"> </span><span class=\"ff1f\">23 <span class=\"_ _102\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:502.36102px;\">Unused tax losses and tax credits<span class=\"_ _a\"> </span><span class=\"ff1f\">1,464 <span class=\"_ _c2\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:490.87555px;\">Derivativ<span class=\"_ _1\"/>es<span class=\"_ _ed\"> </span><span class=\"ff1f\">23 <span class=\"_ _c2\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:479.39008px;\">Pro<span class=\"_ _1\"/>visions<span class=\"_ _7a\"> </span><span class=\"ff1f\">60 <span class=\"_ _c2\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:467.90454px;\">Other<span class=\"_ _43\"> </span><span class=\"ff1f\">34 <span class=\"_ _c2\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:453.8353px;\">Income tax deferr<span class=\"_ _1\"/>ed tax assets<span class=\"_ _cc\"> </span><span class=\"ff1f\">138 <span class=\"_ _c2\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:442.3498px;\">Deferred tax as<span class=\"_ _1\"/>sets<span class=\"_ _19a\"> </span><span class=\"fc1\">1<span class=\"_ _4f\"/>,959 <span class=\"_ _53\"> </span><span class=\"ff20\">1,007<span class=\"_ _2e9\"> </span></span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:430.8643px;\">Deferred tax liabilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:419.3788px;\"><span class=\"_ _2e9\">PRRT4<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:407.8933px;\">Production and gr<span class=\"_ _1\"/>owth as<span class=\"_ _1\"/>sets<span class=\"_ _71\"> </span><span class=\"ff1f\">1,281 <span class=\"_ _c2\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:396.4078px;\">Augmentation for curr<span class=\"_ _1\"/>ent y<span class=\"_ _1\"/>ear<span class=\"_ _14b\"> </span><span class=\"ff1f\">(62)<span class=\"_ _c0\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:384.9223px;\">Pro<span class=\"_ _1\"/>visions<span class=\"_ _37\"> </span><span class=\"ff1f\">(7<span class=\"_ _1\"/>43)<span class=\"_ _c0\"> </span><span class=\"ff20\">-<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:373.4368px;\">Other<span class=\"_ _255\"> </span><span class=\"ff1f\">137 <span class=\"_ _102\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:361.9513px;\">PRRT deferr<span class=\"_ _1\"/>ed tax liabilities<span class=\"_ _252\"> </span><span class=\"ff1f\">613 <span class=\"_ _102\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:350.4658px;\">Income tax<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:338.9803px;\">Oil and gas properties<span class=\"_ _117\"> </span><span class=\"ff1f\">2,857 <span class=\"_ _180\"> </span></span>1,520<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:327.4948px;\">Exploration and e<span class=\"_ _1\"/>valua<span class=\"_ _1\"/>tion assets<span class=\"_ _fc\"> </span><span class=\"ff1f ls70 ws89\">67 <span class=\"_ _b5\"> </span></span><span class=\"ls6a ws83\">51<span class=\"_ _4f\"/> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:316.0093px;\">Lease assets and liabilities<span class=\"_ _116\"> </span><span class=\"ff1f\">(22)<span class=\"_ _f7\"> </span></span>(38)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:304.5238px;\">Pro<span class=\"_ _1\"/>visions<span class=\"_ _256\"> </span><span class=\"ff1f\">(1,280)<span class=\"_ _c1\"> </span></span>(706)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:293.0383px;\">PRRT assets and liabilities<span class=\"_ _18f\"> </span><span class=\"ff1f\">347 <span class=\"_ _dc\"> </span></span>303<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:281.5528px;\">Assets held for sale<span class=\"_ _19c\"> </span><span class=\"ff1f\">-<span class=\"_ _d4\"> </span></span>(205)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:270.0673px;\">Derivativ<span class=\"_ _1\"/>es<span class=\"_ _159\"> </span><span class=\"ff1f\">(36)<span class=\"_ _f6\"> </span></span>(15)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:258.5818px;\">Other<span class=\"_ _81\"> </span><span class=\"ff1f\">(89)<span class=\"_ _d5\"> </span></span>(32)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:244.51254px;\">Income tax deferr<span class=\"_ _1\"/>ed tax liabilities<span class=\"_ _ec\"> </span><span class=\"ff1f\">1,844 <span class=\"_ _d5\"> </span></span><span class=\"ls47 ws82\">878<span class=\"_ _2e9\"> </span></span><span class=\"ls47 ws82\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:227.49881px;\">Deferred tax liabilities<span class=\"_ _212\"> </span><span class=\"fc1\">2,457 <span class=\"_ _181\"> </span><span class=\"ff20 ls47 ws82\">878<span class=\"_ _4f\"/> </span></span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:214.00714px;\">3.  The Group w<span class=\"_ _1\"/>as in a net income tax deferr<span class=\"_ _1\"/>ed tax liability position in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:203.08714px;\">2021.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:189.54634px;\">4.  T<span class=\"_ _1\"/>he Group w<span class=\"_ _1\"/>as in a net PRRT deferr<span class=\"_ _1\"/>ed tax asset position in 2021.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">116<span class=\"_ _93\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:916.95447px;\">K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements<span class=\"fc1\"> </span></div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:896.3693px;\">(a) <span class=\"_ _0\"/>Income tax classi\ufb01cation<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:883.3693px;\">Judgement is required when determining whether a particular tax<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:870.3693px;\">is an income tax or another type of tax. PRRT is considered, for<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:857.3693px;\">accounting purposes, to be an income tax. Accounting for deferred<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:844.3693px;\">tax is applied to income taxes as described above, but is not applied<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:831.3693px;\">to other types of taxes, e.g. North West Shelf royalties, excise and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:818.3693px;\">levies which are recognised in cost of sales in the income statement.  </div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:794.09924px;\">(b) <span class=\"_ _13b\"/> Deferred tax asset recognition<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:781.09924px;\">Income tax losses and credits: Deferred tax assets (DTAs) relating<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:768.09924px;\">to carry forward unused tax losses and credits arising from the USA<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:755.09924px;\">Tax Consolidation Group (USA TCG) of $1,371 million (2021: nil) and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:742.09924px;\">$93 million (2021: nil) arising from regions other than Australia and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:729.09924px;\">the USA have been recognised. The Group has determined that it<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:716.09924px;\"><span class=\"_ _2e9\">is probable that sufficient future taxable income will be available<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:703.09924px;\">to utilise those losses within those regions. Refer to Note E.9(a) for<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:690.09924px;\">details of tax consolidated groups.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:669.72565px;\">DTAs relating to carry forward unused tax losses and credits of <span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:656.72565px;\">$250 million from the USA TCG, $146 million from USA entities<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:643.72565px;\">outside of the USA TCG and $1,061 million from regions other than<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:630.72565px;\">Australia and the USA have not been recognised as it is not currently<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:617.72565px;\">probable that the assets will be utilised based on current planned<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:604.72565px;\">activities in those regions (2021: $497 million unrecognised DTAs).<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:584.35205px;\">PRRT: The recoverability of PRRT deferred tax assets is primarily<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:571.35205px;\">assessed with regard to future oil price assumptions impacting<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:558.35205px;\">forecast future taxable pro\ufb01ts. As a result of higher actual and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:545.35205px;\">forecast assessable revenues supporting future recoverability of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:532.35205px;\">unrecognised quarantined exploration and general expenditure,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:519.35205px;\">the Pluto PRRT DTA has increased by $1,362 million. In determining<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:506.35205px;\">the amount of DTA that is considered probable and eligible for<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:493.35205px;\">recognition, forecast future taxable pro\ufb01ts are risk-adjusted where<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:480.35205px;\">appropriate by a market premium risk rate to re\ufb02ect uncertainty<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:467.35205px;\">inherent in long-term forecasts. A long-term bond rate of 3.2% <span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws73\" style=\"left:354.3662px; bottom:454.35205px;\">(31 December 2021: 1.5%) was used for the purposes of augmentation.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:433.97845px;\"><span class=\"_ _2e9\">Certain deferred tax assets on deductible temporary differences<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:420.97845px;\">have not been recognised on the basis that deductions from future<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:407.97845px;\"><span class=\"_ _2e9\">augmentation of the recognised deductible temporary difference will<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:394.97845px;\"><span class=\"_ _2e9\">be sufficient to offset future taxable pro\ufb01ts. $6,523 million (2021: </span><span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:381.97845px;\">$4,507 million) relates to the North West Shelf Project, $189 million<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:368.97845px;\">(2021: $1,432 million) relates to remaining Pluto quarantined<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:355.97845px;\">exploration expenditure and $831 million (2021: $1,071 million) relates<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:342.97845px;\">to Wheatstone. A long-term bond rate of 3.2% (31 December 2021:<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:329.97845px;\">1.5%) was used for the purposes of augmentation.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:309.60486px;\">Had an alternative approach been used to assess recovery of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:296.60486px;\">the deferred tax assets, whereby future augmentation was not<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:283.60486px;\">included in the assessment, additional deferred tax assets would<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:270.60486px;\">be recognised, with a corresponding bene\ufb01t to tax expense. It<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:257.60486px;\">was determined that the approach adopted provides the most<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:244.60486px;\">meaningful information on the implications of the PRRT regime,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:231.60486px;\">whilst ensuring compliance with AASB 112/ IAS 12 <span class=\"ff23\">Income Taxes</span><span class=\"ls0\">.<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:207.34892px;\">(c) <span class=\"_ _1\"/>Uncertain tax positions<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:194.34892px;\">The Group has tax matters, litigation and other claims, for which the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:181.34892px;\">timing of resolution and potential economic out\ufb02ows are uncertain.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:168.34892px;\">Where the Group assesses an outcome for any tax matter, litigation<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:155.34892px;\">or other claim as more likely than not to be accepted by the relevant<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:142.34892px;\">tax authority, the position is adopted in the reported tax balances.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:121.97533px;\">Because of the complexity of some of these positions the ultimate<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:108.97533px;\"><span class=\"_ _2e9\">outcome may differ from the current estimate of the position. These<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:95.97533px;\"><span class=\"_ _2e9\">differences will be re\ufb02ected as increases or decreases to tax expense<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:82.97533px;\">in the period in which new information is available.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">A.5 <span class=\"_ _fd\"> </span>T<span class=\"_ _13b\"/>axes (<span class=\"_ _1\"/>c<span class=\"_ _1\"/>ont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">Tax transparency code<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:883.93445px;\">Woodside participates in the Australian Board of Taxation\u2019s<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:868.3384px;\">voluntary Tax Transparency Code (TTC). To increase public<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:852.74225px;\">con\ufb01dence in the contributions and compliance of corporate<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:837.1462px;\">taxpayers, the TTC recommends public disclosure of tax<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:821.55005px;\">information. Part A of the recommended disclosures are<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:805.954px;\">addressed within this Taxes note and Part B within our<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:790.35785px;\">Sustainable Development Report, supported by additional<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:774.7618px;\">information on our website.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:746.77924px;\">Recognition and measurement<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:731.17926px;\">Current tax assets and liabilities are measured at the amount<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:715.5831px;\">expected to be recovered from or paid to the taxation<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:699.98706px;\">authorities. Deferred tax assets and liabilities are measured at<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:684.3909px;\">the tax rates that are expected to apply in the period in which<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:668.79486px;\">the liability is settled or the asset is realised. The tax rates and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:653.1987px;\">laws used to determine the amount are based on those that<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:637.60266px;\">have been enacted or substantially enacted by the end of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:622.00653px;\">reporting period. Income taxes relating to items recognised<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:606.41046px;\">directly in equity are recognised in equity.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:578.4242px;\">Current taxes<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:562.82416px;\">Current tax expense is the expected tax payable on the taxable<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:547.2281px;\">income for the current year and any adjustment to tax paid in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:531.63196px;\">respect of previous years.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:503.669px;\">Deferred taxes<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:488.06897px;\">Deferred tax expense represents movements in the temporary<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:472.47287px;\"><span class=\"_ _2e9\">differences between the carrying amount of an asset or liability<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:456.87677px;\">in the consolidated statement of \ufb01nancial position and its tax<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:441.28067px;\">base.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:418.31357px;\">With the exception of those noted below, deferred tax liabilities<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:402.71747px;\"><span class=\"_ _2e9\">are recognised for all taxable temporary differences.<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:379.75037px;\">Deferred tax assets are recognised for deductible temporary<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:364.15427px;\"><span class=\"_ _2e9\">differences, unused tax losses and tax credits only if it is<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:348.55817px;\"><span class=\"_ _2e9\">probable that sufficient future taxable income will be available<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:332.96207px;\"><span class=\"_ _2e9\">to utilise those temporary differences and losses.<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:309.995px;\"><span class=\"_ _2e9\">Deferred tax is not recognised if the temporary difference arises<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:294.39886px;\">from goodwill or from the initial recognition (other than in a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:278.80276px;\">business combination) of assets and liabilities in a transaction<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:263.20667px;\"><span class=\"_ _2e9\">that affects neither accounting pro\ufb01t nor the taxable pro\ufb01t.<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:240.2396px;\">In relation to PRRT, the impact of future augmentation on<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:224.6435px;\">expenditure is included in the determination of future taxable<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:209.04738px;\">pro\ufb01ts when assessing the extent to which a deferred tax asset<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:193.45128px;\">can be recognised in the consolidated statement of \ufb01nancial<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:177.85518px;\">position.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:149.83356px;\"><span class=\"_ _2e9\">Offsetting deferred tax balances<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:134.23355px;\"><span class=\"_ _2e9\">Deferred tax assets and liabilities are offset only if there is<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:118.63745px;\"><span class=\"_ _2e9\">a legally enforceable right to offset current tax assets and<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:103.04135px;\">liabilities and when they relate to income taxes levied by the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:87.44525px;\">same taxation authority on either the same taxable entity or<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:71.84915px;\"><span class=\"_ _2e9\">different taxable entities that the Group intends to settle its<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:56.25305px;\">current tax assets and liabilities on a net basis. Refer to Notes E.8<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:40.65695px;\">and E.9 for detail on the tax consolidated groups.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">A. Earnings for the y<span class=\"_ _0\"/>ear<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"left:653.27094px; bottom:1.4145012px;\">117<span class=\"_ _49\"/><span class=\"ff1e fc5\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h24 ff1d fs2 fc0 sc0 ls0 ws0\" style=\"bottom:927.4895px;\">In this section<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:904.5194px;\">This section addresses the strategic growth (exploration and evaluation), core producing and development (oil and gas properties) </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:888.92334px;\">assets position of the Group at the end of the reporting period including, where applicable, the accounting policies and key estimates </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:873.3272px;\">and judgements applied. This section also includes the impairment position of the Group at the end of the reporting period. </div><div class=\"t m0 h3 ff1f fs1 fce sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:845.6818px;\">B. <span class=\"_ _1a\"> </span>Production and growth assets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:827.25653px;\">B.1 <span class=\"_ _56\"> </span>Segment production and growth assets<span class=\"_ _257\"> </span>Page 118<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:808.82904px;\">B.2 <span class=\"_ _16\"> </span>Exploration and evaluation<span class=\"_ _239\"> </span>Page 120<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:790.40155px;\">B.3 <span class=\"_ _16\"> </span>Oil and gas properties<span class=\"_ _227\"> </span>Page 121<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:772.7462px;\">B.4  Impairment of exploration and evaluation, oil and gas properties and goodwill<span class=\"_ _b5\"> </span>Page 123<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:755.39514px;\">B.5 <span class=\"_ _16\"> </span>Business combination<span class=\"_ _258\"> </span>Page 128<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:736.96765px;\">B.6 <span class=\"_ _4b\"> </span>Signi\ufb01cant production and growth asset acquisitions<span class=\"_ _259\"> </span>Page 130<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:718.5401px;\">B.7 <span class=\"_ _16\"> </span>Disposal of assets<span class=\"_ _25a\"> </span>Page 131<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">B. Pr<span class=\"_ _1\"/>oduction and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">118<span class=\"_ _93\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:327.67563px;\">Refer to Note A.1 for descriptions of the Group\u2019s segments and geographical regions.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls78 ws90\" style=\"left:335.74854px; bottom:885.81476px;\">Australia<span class=\"_ _184\"> </span><span class=\"ls79 ws94\">International<span class=\"_ _c6\"> </span><span class=\"ls0 ws0\">Ma<span class=\"_ _4f\"/>rketi<span class=\"_ _4f\"/>ng<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls7a ws95\" style=\"left:538.9228px; bottom:895.56476px;\">Corpo<span class=\"_ _4f\"/>rate/<span class=\"_ _1\"/> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls78 ws90\" style=\"left:561.3452px; bottom:885.81476px;\">Other<span class=\"_ _51\"> </span><span class=\"ls7b ws96\">Consolidated<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:352.21954px; bottom:871.07275px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _160\"> </span>2022<span class=\"_ _160\"> </span>2<span class=\"_ _4f\"/>022<span class=\"_ _160\"> </span>202<span class=\"_ _4f\"/>2<span class=\"_ _160\"> </span>2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:349.54126px; bottom:856.33075px;\">US$m<span class=\"_ _5\"> </span>US$m<span class=\"_ _5\"> </span>US$m<span class=\"_ _5\"> </span>US$m<span class=\"_ _165\"> </span>US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:839.317px;\">Balance as at 31 December<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:824.575px;\">Asia Paci\ufb01c<span class=\"_ _237\"> </span><span class=\"ff1f\">529 <span class=\"_ _5a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _249\"> </span>529<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:809.833px;\">Americas<span class=\"_ _25b\"> </span><span class=\"ff1f\">-<span class=\"_ _a5\"> </span>240 <span class=\"_ _5a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _a5\"> </span>240<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:795.091px;\">Africa<span class=\"_ _25c\"> </span><span class=\"ff1f\">-<span class=\"_ _10b\"> </span>38 <span class=\"_ _5a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _a7\"> </span>38<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:778.0773px;\">T<span class=\"_ _0\"/>otal explora<span class=\"_ _1\"/>tion and ev<span class=\"_ _1\"/>aluation<span class=\"_ _25d\"> </span><span class=\"fc1\">529 <span class=\"_ _13f\"> </span><span class=\"ls6b ws84\">278 <span class=\"_ _5a\"> </span></span>-<span class=\"_ _13\"> </span>-<span class=\"_ _14a\"> </span>807<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:761.06354px;\">Balance as at 31 December<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:746.32153px;\">Land and buildings<span class=\"_ _248\"> </span><span class=\"ff1f\">802 <span class=\"_ _a9\"> </span><span class=\"ls70 ws89\">37<span class=\"_ _4f\"/> <span class=\"_ _5a\"> </span></span>-<span class=\"_ _13\"> </span>1 <span class=\"_ _b0\"> </span>840<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:731.5795px;\">T<span class=\"_ _0\"/>ransferred e<span class=\"_ _1\"/>xplor<span class=\"_ _1\"/>ation and ev<span class=\"_ _1\"/>aluation<span class=\"_ _161\"> </span><span class=\"ff1f\">481 <span class=\"_ _5a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _ab\"> </span>481<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:716.8375px;\">Plant and equipment<span class=\"_ _25e\"> </span><span class=\"ff1f\">18,249 <span class=\"_ _169\"> </span>4,647 <span class=\"_ _5a\"> </span>-<span class=\"_ _10d\"> </span>161 <span class=\"_ _188\"> </span>23,05<span class=\"_ _1\"/>7<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:702.0955px;\">Projects in de<span class=\"_ _1\"/>velopmen<span class=\"_ _1\"/><span class=\"_ _2e9\">t1</span><span class=\"_ _25f\"> </span><span class=\"ff1f\">5,623 <span class=\"_ _bc\"> </span><span class=\"lsa wsf\">9<span class=\"_ _4f\"/>,795 <span class=\"_ _5a\"> </span></span>-<span class=\"_ _a4\"> </span>123 <span class=\"_ _169\"> </span>15,54<span class=\"_ _1\"/>1<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:685.0818px;\">T<span class=\"_ _0\"/>otal oil and gas properties<span class=\"_ _4\"> </span><span class=\"fc1\">25,155 <span class=\"_ _fa\"> </span>14,479 <span class=\"_ _5a\"> </span>-<span class=\"_ _249\"> </span>285 <span class=\"_ _189\"> </span>39,919<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:668.068px;\">Balance as at 31 December<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:653.32605px;\">Land and buildings<span class=\"_ _21b\"> </span><span class=\"ff1f ls47 ws82\">93 <span class=\"_ _a5\"> </span></span><span class=\"ff1f\">107 <span class=\"_ _5a\"> </span>-<span class=\"_ _14a\"> </span>264 <span class=\"_ _b0\"> </span>464<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:638.58405px;\">Plant and equipment<span class=\"_ _260\"> </span><span class=\"ff1f\">214 <span class=\"_ _ab\"> </span>131 <span class=\"_ _5a\"> </span>-<span class=\"_ _249\"> </span><span class=\"ls73 ws8c\">455 <span class=\"_ _b0\"> </span></span>800<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:621.57025px;\">T<span class=\"_ _0\"/>otal lease assets<span class=\"_ _1c1\"> </span><span class=\"fc1\">307 <span class=\"_ _ae\"> </span>238 <span class=\"_ _5a\"> </span>-<span class=\"_ _a4\"> </span>719 <span class=\"_ _165\"> </span>1,264<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:604.5565px;\">Additions to e<span class=\"_ _1\"/>xplor<span class=\"_ _1\"/>ation and ev<span class=\"_ _1\"/>aluation</div><div class=\"t m0 hab ff22 fs54 fc0 sc0 ls0 ws0\" style=\"left:170.4322px; bottom:607.8323px;\">2</div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:173.31223px; bottom:604.5855px;\">:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:589.8435px;\">Exploration<span class=\"_ _261\"> </span><span class=\"ff1f\">1 <span class=\"_ _ab\"> </span>121 <span class=\"_ _5a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _a4\"> </span>122<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:575.1015px;\">Ev<span class=\"_ _1\"/>aluation<span class=\"_ _1b8\"> </span><span class=\"ff1f\">19 <span class=\"_ _13f\"> </span>100 <span class=\"_ _5a\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _10d\"> </span>119<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:560.3595px;\">Restor<span class=\"_ _1\"/><span class=\"_ _2e9\">ation3</span><span class=\"_ _262\"> </span><span class=\"ff1f\">(1)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _78\"> </span>(1<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\">)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:366.07544px; bottom:545.6175px;\">19 <span class=\"_ _14a\"> </span>221 <span class=\"_ _263\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _a5\"> </span>240<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:528.60376px;\">Additions to oil and gas pr<span class=\"_ _1\"/>operties<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hab ff22 fs54 fc0 sc0 ls0 ws0\" style=\"left:150.23567px; bottom:531.8592px;\">2</div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:152.76248px; bottom:528.6125px;\">:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:513.8705px;\">Oil and gas properties<span class=\"_ _220\"> </span><span class=\"ff1f\">2,252 <span class=\"_ _18a\"> </span>1<span class=\"_ _4f\"/>,560 <span class=\"_ _5a\"> </span>-<span class=\"_ _10b\"> </span><span class=\"ls47 ws82\">92 <span class=\"_ _169\"> </span></span>3,904<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:499.12848px;\">Capitalised borro<span class=\"_ _1\"/><span class=\"_ _2e9\">wings costs4</span><span class=\"_ _264\"> </span><span class=\"ff1f\">115 <span class=\"_ _14a\"> </span>179 <span class=\"_ _5a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _a5\"> </span>294<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:484.38647px;\">Restor<span class=\"_ _1\"/><span class=\"_ _2e9\">ation3</span><span class=\"_ _265\"> </span><span class=\"ff1f\">(346)<span class=\"_ _13f\"> </span>(28)<span class=\"_ _a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _8c\"> </span>(37<span class=\"_ _0\"/>4)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:352.21954px; bottom:469.64447px;\">2,021 <span class=\"_ _9e\"> </span>1,711 <span class=\"_ _5a\"> </span>-<span class=\"_ _a7\"> </span><span class=\"ls47 ws82\">92 <span class=\"_ _bc\"> </span></span>3,824<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:452.6307px;\">Additions to lease as<span class=\"_ _1\"/>sets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hab ff22 fs54 fc0 sc0 ls0 ws0\" style=\"left:107.55679px; bottom:455.88605px;\">2<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:111.12335px; bottom:452.6393px;\">:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:437.8973px;\">Land and buildings<span class=\"_ _1f0\"> </span><span class=\"ff1f\">4 <span class=\"_ _5a\"> </span>-<span class=\"_ _13\"> </span>-<span class=\"_ _5f\"> </span>-<span class=\"_ _6b\"> </span>4<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:423.1553px;\">Plant and equipment<span class=\"_ _260\"> </span><span class=\"ff1f\">139 <span class=\"_ _a4\"> </span>90 <span class=\"_ _5a\"> </span>-<span class=\"_ _6b\"> </span>9 <span class=\"_ _13f\"> </span>238<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:360.69748px; bottom:408.4133px;\">143 <span class=\"_ _5d\"> </span>90 <span class=\"_ _5a\"> </span>-<span class=\"_ _6b\"> </span>9 <span class=\"_ _13f\"> </span><span class=\"ls2a ws36\">242<span class=\"_ _2e9\"> </span></span><span class=\"ls2a ws36\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:393.6787px;\">1. <span class=\"_ _29\"> </span>Projects in de<span class=\"_ _1\"/>velopment include the f<span class=\"_ _1\"/>air value ascribed to futur<span class=\"_ _1\"/>e phases of certain pr<span class=\"_ _1\"/>ojects acquired thr<span class=\"_ _1\"/>ough business combinations.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:378.9367px;\">2.  Additions ex<span class=\"_ _1\"/>clude acquisitions thr<span class=\"_ _1\"/>ough business combinations.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:364.95px;\">3.  Relates to changes in r<span class=\"_ _1\"/>estor<span class=\"_ _1\"/>ation pro<span class=\"_ _1\"/>vision assumptions.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:351.4092px;\">4.  Borr<span class=\"_ _1\"/>owing c<span class=\"_ _1\"/>osts capitalised wer<span class=\"_ _1\"/>e at a weigh<span class=\"_ _1\"/>ted av<span class=\"_ _1\"/>erage int<span class=\"_ _1\"/>erest r<span class=\"_ _1\"/>ate of 3.8%.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">B.<span class=\"_ _0\"/>1 <span class=\"_ _18\"> </span>Segment production and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">B. Pr<span class=\"_ _1\"/>oduction and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"left:653.27094px; bottom:1.4145012px;\">119<span class=\"_ _49\"/><span class=\"ff1e fc5\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">B.<span class=\"_ _0\"/>1 <span class=\"_ _18\"> </span>Segment production and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets (<span class=\"_ _1\"/>cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:337.23184px; bottom:885.81476px;\">Austr<span class=\"_ _1\"/>alia<span class=\"_ _180\"> </span>International<span class=\"_ _b2\"> </span>Marketing<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:538.9228px; bottom:895.56476px;\">Corpor<span class=\"_ _1\"/>ate/<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:562.37897px; bottom:885.81476px;\">Other<span class=\"_ _182\"> </span>Consolidated<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:352.21954px; bottom:871.07275px;\"><span class=\"_ _2e9\">20212</span><span class=\"_ _160\"> </span><span class=\"_ _2e9\">20212</span><span class=\"_ _160\"> </span><span class=\"_ _2e9\">20212</span><span class=\"_ _160\"> </span><span class=\"_ _2e9\">20212</span><span class=\"_ _ae\"> </span>2021<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:349.54126px; bottom:856.33075px;\">US$m<span class=\"_ _5\"> </span>US$m<span class=\"_ _165\"> </span>US$m<span class=\"_ _165\"> </span>US$m<span class=\"_ _5\"> </span>US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:839.317px;\">Balance as at 31 December<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:824.575px;\">Asia Paci\ufb01c<span class=\"_ _1b3\"> </span> 546 <span class=\"_ _a1\"> </span> - <span class=\"_ _217\"> </span> - <span class=\"_ _106\"> </span> - <span class=\"_ _9e\"> </span> 546<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:809.833px;\">Americas<span class=\"_ _12\"> </span> - <span class=\"_ _106\"> </span> - <span class=\"_ _106\"> </span> - <span class=\"_ _106\"> </span> - <span class=\"_ _106\"> </span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:795.091px;\">Africa<span class=\"_ _1f4\"> </span> - <span class=\"_ _107\"> </span> 68 <span class=\"_ _217\"> </span> - <span class=\"_ _106\"> </span> - <span class=\"_ _107\"> </span> 68<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:778.0773px;\">T<span class=\"_ _0\"/>otal explora<span class=\"_ _1\"/>tion and ev<span class=\"_ _1\"/>aluation<span class=\"_ _266\"> </span><span class=\"ff20 fc1\"> 546 <span class=\"_ _107\"> </span> 68 <span class=\"_ _106\"> </span> - <span class=\"_ _217\"> </span> - <span class=\"_ _13f\"> </span> 614<span class=\"_ _2e9\"> </span></span><span class=\"ff20 fc1\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:761.06354px;\">Balance as at 31 December<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:746.32153px;\">Land and buildings<span class=\"_ _205\"> </span> 7<span class=\"_ _1\"/>38 <span class=\"_ _106\"> </span> - <span class=\"_ _106\"> </span> - <span class=\"_ _a\"> </span> 1 <span class=\"_ _8c\"> </span><span class=\"lsa wsf\"> 739<span class=\"_ _2e9\"> </span></span><span class=\"lsa wsf\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:731.5795px;\">T<span class=\"_ _0\"/>ransferred e<span class=\"_ _1\"/>xplor<span class=\"_ _1\"/>ation and ev<span class=\"_ _1\"/>aluation<span class=\"_ _1a2\"> </span><span class=\"ls47 ws82\"> 52<span class=\"_ _4f\"/>6 <span class=\"_ _106\"> </span></span> - <span class=\"_ _106\"> </span> - <span class=\"_ _106\"> </span> - <span class=\"_ _b0\"> </span><span class=\"ls47 ws82\"> 526<span class=\"_ _4f\"/> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:716.8375px;\">Plant and equipment<span class=\"_ _231\"> </span> 12,316 <span class=\"_ _f8\"> </span> 3 <span class=\"_ _106\"> </span> - <span class=\"_ _13f\"> </span> 146 <span class=\"_ _fa\"> </span> 12,465<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:702.0955px;\">Projects in de<span class=\"_ _1\"/>velopmen<span class=\"_ _1\"/>t<span class=\"_ _156\"> </span> 2,646 <span class=\"_ _165\"> </span> 2,195 <span class=\"_ _a1\"> </span> - <span class=\"_ _5d\"> </span><span class=\"ls47 ws82\"> 78 <span class=\"_ _17a\"> </span></span> 4,919<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:685.0818px;\">T<span class=\"_ _0\"/>otal oil and gas properties<span class=\"_ _23c\"> </span><span class=\"ff20 fc1\"> 16,226 <span class=\"_ _7\"> </span> 2,<span class=\"_ _1\"/>198 <span class=\"_ _106\"> </span> - <span class=\"_ _8c\"> </span> 225 <span class=\"_ _da\"> </span> 18,649<span class=\"_ _2e9\"> </span></span><span class=\"ff20 fc1\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:668.068px;\">Balance as at 31 December<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:653.32605px;\">Land and buildings<span class=\"_ _98\"> </span><span class=\"ls80 ws9c\"> 76<span class=\"_ _4f\"/> <span class=\"_ _10b\"> </span></span> 11 <span class=\"_ _a\"> </span> 1 <span class=\"_ _b0\"> </span> 289 <span class=\"_ _140\"> </span> 377<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:638.58405px;\">Plant and equipment<span class=\"_ _267\"> </span> 133 <span class=\"_ _142\"> </span> 176 <span class=\"_ _106\"> </span> - <span class=\"_ _9e\"> </span> 394 <span class=\"_ _b0\"> </span><span class=\"ls72 ws8b\"> 703<span class=\"_ _4f\"/> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:621.57025px;\">T<span class=\"_ _0\"/>otal lease assets<span class=\"_ _268\"> </span><span class=\"ff20 fc1\"> 209 <span class=\"_ _142\"> </span> 187 <span class=\"_ _a\"> </span> 1 <span class=\"_ _bd\"> </span> 683 <span class=\"_ _bc\"> </span> 1,080<span class=\"_ _2e9\"> </span></span><span class=\"ff20 fc1\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:604.5565px;\">Additions to e<span class=\"_ _1\"/>xplor<span class=\"_ _1\"/>ation and ev<span class=\"_ _1\"/>aluation:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:589.8145px;\">Exploration<span class=\"_ _234\"> </span> 1 <span class=\"_ _61\"> </span><span class=\"ls6e ws87\"> 41 <span class=\"_ _106\"> </span></span> - <span class=\"_ _217\"> </span> - <span class=\"_ _a2\"> </span><span class=\"ls7d ws98\"> 42<span class=\"_ _2e9\"> </span></span><span class=\"ls7d ws98\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:575.0725px;\">Ev<span class=\"_ _1\"/>aluation<span class=\"_ _269\"> </span><span class=\"ls6a ws83\"> 451 <span class=\"_ _f8\"> </span></span> 2 <span class=\"_ _106\"> </span> - <span class=\"_ _106\"> </span> - <span class=\"_ _bd\"> </span><span class=\"ls6 wsa\"> 4<span class=\"_ _4f\"/>53<span class=\"_ _2e9\"> </span></span><span class=\"ls6 wsa\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:560.3305px;\">Restor<span class=\"_ _1\"/>ation<span class=\"_ _1ff\"> </span> 6 <span class=\"_ _217\"> </span> - <span class=\"_ _106\"> </span> - <span class=\"_ _106\"> </span> - <span class=\"_ _105\"> </span> 6 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:356.82153px; bottom:545.5885px;\"> 458 <span class=\"_ _107\"> </span><span class=\"ls7d ws98\"> 43<span class=\"_ _4f\"/> <span class=\"_ _a1\"> </span></span> - <span class=\"_ _217\"> </span> - <span class=\"_ _ae\"> </span> 501<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:528.57477px;\">Additions to oil and gas pr<span class=\"_ _1\"/>operties:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:513.83276px;\">Oil and gas properties<span class=\"_ _238\"> </span> 1,0<span class=\"_ _1\"/>71 <span class=\"_ _163\"> </span> 1,051 <span class=\"_ _106\"> </span> - <span class=\"_ _5d\"> </span><span class=\"ls7e ws99\"> 57<span class=\"_ _4f\"/> <span class=\"_ _7\"> </span></span> 2,17<span class=\"_ _1\"/>9<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:499.09076px;\">Capitalised borro<span class=\"_ _1\"/><span class=\"_ _2e9\">wings costs1</span><span class=\"_ _26a\"> </span> 46 <span class=\"_ _5d\"> </span> 77 <span class=\"_ _106\"> </span> - <span class=\"_ _106\"> </span> - <span class=\"_ _13e\"> </span> 123<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:484.34875px;\">Restor<span class=\"_ _1\"/>ation<span class=\"_ _200\"> </span> 18 <span class=\"_ _79\"> </span> 14 <span class=\"_ _106\"> </span> - <span class=\"_ _217\"> </span> - <span class=\"_ _ab\"> </span><span class=\"ls6c ws85\"> 32</span><span class=\"ls6c ws85\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:469.60678px;\"> 1,<span class=\"_ _1\"/>135 <span class=\"_ _a8\"> </span> 1,142 <span class=\"_ _106\"> </span> - <span class=\"_ _5d\"> </span><span class=\"ls7e ws99\"> 57 <span class=\"_ _16c\"> </span></span> 2,334<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:452.59302px;\">Additions to lease as<span class=\"_ _1\"/>sets:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:437.851px;\">Land and buildings<span class=\"_ _1f0\"> </span> - <span class=\"_ _79\"> </span> 14 <span class=\"_ _217\"> </span> - <span class=\"_ _106\"> </span> - <span class=\"_ _a9\"> </span> 14<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:423.109px;\">Plant and equipment<span class=\"_ _246\"> </span> - <span class=\"_ _13f\"> </span> 214 <span class=\"_ _106\"> </span> - <span class=\"_ _106\"> </span> - <span class=\"_ _142\"> </span> 214 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:369.93542px; bottom:408.36703px;\"> - <span class=\"_ _b0\"> </span> 228 <span class=\"_ _106\"> </span> - <span class=\"_ _217\"> </span> - <span class=\"_ _b0\"> </span> 228<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:393.6787px;\">1. <span class=\"_ _29\"> </span>Borro<span class=\"_ _1\"/>wing costs capitalised w<span class=\"_ _1\"/>ere at a w<span class=\"_ _1\"/>eighted a<span class=\"_ _1\"/>ver<span class=\"_ _1\"/>age interes<span class=\"_ _1\"/>t rate of 3.<span class=\"_ _1\"/>6%.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:380.1379px;\">2.  The 2021 amounts hav<span class=\"_ _1\"/>e been resta<span class=\"_ _1\"/>ted to r<span class=\"_ _1\"/>e\ufb02ect the changes in operating segments. R<span class=\"_ _1\"/>efer to \u2018Oper<span class=\"_ _1\"/>ating segment information\u2019 in Note A.<span class=\"_ _1\"/>1 f<span class=\"_ _1\"/>or details. In addition, oil and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:369.2179px;\">gas properties includes other plant and equipment which is no longer separ<span class=\"_ _1\"/>ately pr<span class=\"_ _1\"/>esented in the consolidat<span class=\"_ _1\"/>ed statement of \ufb01nancial position. T<span class=\"_ _1\"/>he 2021 amounts hav<span class=\"_ _1\"/>e<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:358.2979px;\">been reclassi\ufb01ed t<span class=\"_ _1\"/>o be presented on the same basis.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">B. Pr<span class=\"_ _1\"/>oduction and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">120<span class=\"_ _1a\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">B.2 <span class=\"_ _56\"> </span>Exploration and e<span class=\"_ _1\"/>v<span class=\"_ _1\"/>aluation<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:345.46844px; bottom:897.40753px;\">Asia Paci\ufb01c<span class=\"_ _a8\"> </span>Americas<span class=\"_ _217\"> </span>Africa<span class=\"_ _5f\"> </span>T<span class=\"_ _0\"/>otal<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:369.93542px; bottom:883.33826px;\">US$m<span class=\"_ _106\"> </span>US$m<span class=\"_ _217\"> </span>US$m<span class=\"_ _106\"> </span>US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:866.3245px;\">Y<span class=\"_ _0\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:852.25525px;\">Carrying amount at 1 January 2022<span class=\"_ _84\"> </span><span class=\"ff1f\">546 <span class=\"_ _16a\"> </span>-<span class=\"_ _26b\"> </span>68 <span class=\"_ _6d\"> </span>614<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:838.18604px;\">Acquisitions thr<span class=\"_ _1\"/><span class=\"_ _2e9\">ough business combination1</span><span class=\"_ _26c\"> </span><span class=\"ff1f\">-<span class=\"_ _5b\"> </span>180 <span class=\"_ _16a\"> </span>-<span class=\"_ _5b\"> </span>180<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:824.11676px;\">Additions<span class=\"_ _1b2\"> </span><span class=\"ff1f\">19 <span class=\"_ _67\"> </span>204 <span class=\"_ _26b\"> </span>17 <span class=\"_ _a6\"> </span>240<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:810.04755px;\">Disposals<span class=\"_ _1e7\"> </span><span class=\"ff1f\">-<span class=\"_ _70\"> </span>(10)<span class=\"_ _71\"> </span>-<span class=\"_ _70\"> </span>(10)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:795.9783px;\">Amortisation of licence ac<span class=\"_ _1\"/>quisition costs<span class=\"_ _a0\"> </span><span class=\"ff1f\">-<span class=\"_ _172\"> </span>(8)<span class=\"_ _171\"> </span>(2)<span class=\"_ _6d\"> </span>(10)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:781.909px;\"><span class=\"_ _2e9\">Expensed2</span><span class=\"_ _1e4\"> </span><span class=\"ff1f\">-<span class=\"_ _7d\"> </span>(126)<span class=\"_ _7d\"> </span><span class=\"ls6e ws87\">(45)<span class=\"_ _67\"> </span></span>(171)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:764.89526px;\">T<span class=\"_ _0\"/>ransferred e<span class=\"_ _1\"/>xplor<span class=\"_ _1\"/>ation and ev<span class=\"_ _1\"/>aluation<span class=\"_ _150\"> </span><span class=\"ff1f\">(36)<span class=\"_ _71\"> </span>-<span class=\"_ _101\"> </span>-<span class=\"_ _ec\"> </span>(36)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:744.19604px;\">Carrying amount at 31 December 2022<span class=\"_ _1bf\"> </span><span class=\"fc1\">529 <span class=\"_ _a6\"> </span>240 <span class=\"_ _6a\"> </span>38 <span class=\"_ _177\"> </span>807<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:730.1268px;\">Y<span class=\"_ _0\"/><span class=\"_ _2e9\">ear ended 31 December 20213<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:716.0575px;\">Carrying amount at 1 January 2021<span class=\"_ _26d\"> </span>1,981 <span class=\"_ _16a\"> </span>-<span class=\"_ _173\"> </span>64 <span class=\"_ _a1\"> </span>2,045<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:701.9883px;\">Additions<span class=\"_ _26e\"> </span>494 <span class=\"_ _16a\"> </span>-<span class=\"_ _14b\"> </span>7 <span class=\"_ _86\"> </span>501<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:687.919px;\">Amortisation of licence ac<span class=\"_ _1\"/>quisition costs<span class=\"_ _162\"> </span>-<span class=\"_ _101\"> </span>-<span class=\"_ _ce\"> </span>(3)<span class=\"_ _fc\"> </span>(3)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:673.8498px;\"><span class=\"_ _2e9\">Expensed2</span><span class=\"_ _26f\"> </span><span class=\"ls6c ws85\">(265)<span class=\"_ _71\"> </span></span>-<span class=\"_ _101\"> </span>-<span class=\"_ _177\"> </span><span class=\"ls6c ws85\">(<span class=\"_ _4f\"/>265)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:659.7805px;\">T<span class=\"_ _0\"/>ransferred e<span class=\"_ _1\"/>xplor<span class=\"_ _1\"/>ation and ev<span class=\"_ _1\"/>aluation<span class=\"_ _270\"> </span>(1,664)<span class=\"_ _71\"> </span>-<span class=\"_ _101\"> </span>-<span class=\"_ _a\"> </span>(1,664)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:642.7668px;\">Carrying amount at 31 December 2021<span class=\"_ _150\"> </span>546 <span class=\"_ _17e\"> </span>-<span class=\"_ _173\"> </span>68 <span class=\"_ _86\"> </span>614<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:625.753px;\">Exploration c<span class=\"_ _1\"/>ommitments<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:608.6808px;\">Y<span class=\"_ _0\"/>ear ended 31 December 2022<span class=\"_ _220\"> </span><span class=\"fc1\">1 <span class=\"_ _17e\"> </span>1 <span class=\"_ _6a\"> </span><span class=\"ls2b ws32\">27<span class=\"_ _4f\"/> <span class=\"_ _70\"> </span></span>29<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:594.6213px;\">Y<span class=\"_ _0\"/><span class=\"_ _2e9\">ear ended 31 December 20213</span><span class=\"_ _224\"> </span>16 <span class=\"_ _ca\"> </span>1 <span class=\"_ _fc\"> </span>77 <span class=\"_ _6a\"> </span>94<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:581.1444px;\">1. <span class=\"_ _29\"> </span>Acquisitions thr<span class=\"_ _1\"/>ough business combination ha<span class=\"_ _1\"/>ve been r<span class=\"_ _1\"/>ecognised on a pr<span class=\"_ _1\"/>ovisional basis. A<span class=\"_ _1\"/>djustments will be made to the pr<span class=\"_ _1\"/>ovisional amounts if ne<span class=\"_ _1\"/>w information is<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:570.2244px;\">obtained within 12 months from the acquisition da<span class=\"_ _1\"/>te. Refer t<span class=\"_ _1\"/>o Note B.5 for details.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:556.68365px;\">2.  $125 million (2021: $56 million) relates t<span class=\"_ _1\"/>o costs of unsucc<span class=\"_ _1\"/>essful wells. F<span class=\"_ _1\"/>or the year ended 31 Dec<span class=\"_ _1\"/>ember 2021, $209 million relat<span class=\"_ _1\"/>es to capitalised costs writt<span class=\"_ _1\"/><span class=\"_ _2e9\">en off due to the<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:545.7636px;\">Group\u2019<span class=\"_ _1\"/>s decision to withdra<span class=\"_ _1\"/>w its inter<span class=\"_ _1\"/>ests in Myanmar<span class=\"_ _0\"/>.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:532.22284px;\">3.  Oceania and Asia hav<span class=\"_ _1\"/>e been presented within Asia P<span class=\"_ _1\"/>aci\ufb01c for the year ended 31 Dec<span class=\"_ _1\"/>ember 2022. The 2021 amounts ha<span class=\"_ _1\"/>ve been r<span class=\"_ _1\"/>eclassi\ufb01ed to be pr<span class=\"_ _1\"/>esented on the same<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:521.30286px;\">basis.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:487.81366px;\">Recognition and measurement<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:472.21365px;\">Expenditure on exploration and evaluation is accounted for in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:456.61755px;\">accordance with the area of interest method.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:433.65045px;\">Areas of interest are based on a geographical area for which<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:418.05435px;\">the rights of tenure are current. All exploration and evaluation<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:402.45825px;\">expenditure, including general permit activity, geological and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:386.86215px;\">geophysical costs and new venture activity costs, is expensed  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:371.26605px;\">as incurred except for the following:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:348.29895px;\">\u2022 <span class=\"_ _4b\"> </span>where the expenditure relates to an exploration discovery<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:332.70285px;\">for which the assessment of the existence or otherwise of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:317.10675px;\">economically recoverable hydrocarbons is not yet complete;<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:301.51065px;\">or<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:282.22906px;\">\u2022 <span class=\"_ _4b\"> </span>where the expenditure is expected to be recouped through<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:266.63297px;\">successful exploitation of the area of interest, or alternatively,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:251.03687px;\">by its sale.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:231.75525px;\">The costs of acquiring interests in new exploration and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:216.15916px;\">evaluation licences are capitalised. The costs of drilling<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:200.56306px;\">exploration wells are initially capitalised pending the results  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:184.96696px;\">of the well.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:161.99986px;\">Costs are expensed where the well does not result in the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:146.40376px;\">successful discovery of economically recoverable hydrocarbons<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:130.80766px;\">and the recognition of an area of interest.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:107.84056px;\">Subsequent to the recognition of an area of interest, all further<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:92.24446px;\">evaluation costs relating to that area of interest are capitalised.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:76.64836px;\">Upon approval for the commercial development of an area of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:61.05226px;\">interest, accumulated expenditure for the area of interest is<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:45.45616px;\">transferred to oil and gas properties.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:489.2021px;\">In the consolidated statement of cash \ufb02ows, those cash<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:473.60596px;\">\ufb02ows associated with capitalised exploration and evaluation<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:458.00986px;\">expenditure, including unsuccessful wells, are classi\ufb01ed as cash<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:442.41376px;\">\ufb02ows used in investing activities.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:414.35846px;\">Exploration commitments<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:398.75845px;\">The Group has exploration expenditure obligations which  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:383.16235px;\">are contracted for, but not provided for in the \ufb01nancial<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:367.56625px;\">statements. These obligations may be varied from time to time<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:351.97015px;\">and are expected to be ful\ufb01lled in the normal course of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:336.37405px;\">Group\u2019s operations.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:308.40338px;\">Impairment<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:292.80338px;\">Refer to Note B.4 for details on impairment, including any<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:277.20728px;\"><span class=\"_ _2e9\">write-offs.<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:243.69836px;\">K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:223.11337px;\">(a) <span class=\"_ _0\"/>Area of interest<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:210.11337px;\">Typically, an area of interest (AOI) is de\ufb01ned by the Group as an<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:197.11337px;\">individual geographical area whereby the presence of hydrocarbons<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:184.11337px;\">is considered favourable or proved to exist. The Group has<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:171.11337px;\">established criteria to recognise and maintain an AOI.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:146.84329px;\">(b) <span class=\"_ _13b\"/>Transfer to projects in development<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:133.84329px;\">Development activities commence after project sanctioning by<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:120.84329px;\">the appropriate level of management. Judgement is applied by<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:107.84329px;\">management in determining when the project is technically feasible<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:94.84329px;\">and economically viable to transfer to projects in development.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">B. Pr<span class=\"_ _1\"/>oduction and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"left:653.27094px; bottom:1.4145012px;\">121<span class=\"_ _49\"/><span class=\"ff1e fc5\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:271.02206px; bottom:892.2022px;\">Land and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:271.02206px; bottom:882.4522px;\">buildings<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:348.1162px; bottom:901.9522px;\">T<span class=\"_ _1\"/>r<span class=\"_ _1\"/>ansferred<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:329.787px; bottom:892.2022px;\">explor<span class=\"_ _1\"/>ation and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:352.21954px; bottom:882.4522px;\">ev<span class=\"_ _1\"/>aluation<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:443.23865px; bottom:892.2022px;\">Plant and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:437.44037px; bottom:882.4522px;\">equipment<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:525.9964px; bottom:892.2022px;\">Projects in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:514.5303px; bottom:882.4522px;\">dev<span class=\"_ _1\"/>elopment<span class=\"_ _63\"> </span>T<span class=\"_ _1\"/>otal<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:284.74796px; bottom:867.7102px;\">US$m<span class=\"_ _9d\"> </span>US$m<span class=\"_ _9d\"> </span>US$m<span class=\"_ _9d\"> </span>US$m<span class=\"_ _9d\"> </span>US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:850.6964px;\">Y<span class=\"_ _0\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:835.95447px;\">Carrying amount at 1 January 2022<span class=\"_ _16b\"> </span><span class=\"ff1f lsa wsf\">739 <span class=\"_ _67\"> </span><span class=\"ls6 wsa\">526 <span class=\"_ _79\"> </span></span></span><span class=\"ff1f\">12,465 <span class=\"_ _f8\"> </span>4,919 <span class=\"_ _5d\"> </span>18,649<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:821.21246px;\">Acquisitions thr<span class=\"_ _1\"/><span class=\"_ _2e9\">ough business combinations1</span><span class=\"_ _19f\"> </span><span class=\"ff1f\">64 <span class=\"_ _71\"> </span>-<span class=\"_ _9d\"> </span>11<span class=\"_ _4f\"/>,952 <span class=\"_ _9d\"> </span>7<span class=\"_ _1\"/>,337 <span class=\"_ _79\"> </span><span class=\"ls6a ws83\">19,353<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ls6a ws83\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:806.47046px;\"><span class=\"_ _2e9\">Additions2</span><span class=\"_ _231\"> </span><span class=\"ff1f\">-<span class=\"_ _14b\"> </span>-<span class=\"_ _65\"> </span>(508)<span class=\"_ _10b\"> </span>4,332 <span class=\"_ _a7\"> </span>3,824<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:791.72845px;\">Disposals at written do<span class=\"_ _1\"/>wn value<span class=\"_ _76\"> </span><span class=\"ff1f\">(3)<span class=\"_ _7d\"> </span>(10)<span class=\"_ _177\"> </span>(32)<span class=\"_ _23\"> </span>-<span class=\"_ _86\"> </span><span class=\"ls6e ws87\">(45<span class=\"_ _4f\"/>)<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:776.98645px;\">Depreciation and amortisation<span class=\"_ _76\"> </span><span class=\"ff1f\">(54)<span class=\"_ _263\"> </span>(107)<span class=\"_ _ab\"> </span>(2,637)<span class=\"_ _ce\"> </span>-<span class=\"_ _10b\"> </span>(2,<span class=\"_ _1\"/>798)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:762.24445px;\">Impairment re<span class=\"_ _1\"/>ver<span class=\"_ _1\"/><span class=\"_ _2e9\">sal3</span><span class=\"_ _271\"> </span><span class=\"ff1f ls6b ws84\">87 <span class=\"_ _ec\"> </span></span><span class=\"ff1f\">30 <span class=\"_ _67\"> </span>783 <span class=\"_ _71\"> </span>-<span class=\"_ _177\"> </span>900<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:747.50244px;\">Completions and tr<span class=\"_ _1\"/>ansfers<span class=\"_ _203\"> </span><span class=\"ff1f\">7 <span class=\"_ _ec\"> </span><span class=\"ls6c ws85\">42 <span class=\"_ _f8\"> </span></span>1,034 <span class=\"_ _61\"> </span>(1,04<span class=\"_ _1\"/>7)<span class=\"_ _60\"> </span>36<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:732.76044px;\">Carrying amount at 31 December 2022<span class=\"_ _2a\"> </span><span class=\"fc1\">840 <span class=\"_ _7d\"> </span>481 <span class=\"_ _107\"> </span>23,057 <span class=\"_ _9f\"> </span>15,541 <span class=\"_ _5d\"> </span>39,919<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:718.01843px;\">At 31 Dec<span class=\"_ _1\"/>ember 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:701.0047px;\">Historical c<span class=\"_ _1\"/>ost<span class=\"_ _222\"> </span><span class=\"ff1f\">1,765 <span class=\"_ _106\"> </span>1,538 <span class=\"_ _a2\"> </span>45,273 <span class=\"_ _a9\"> </span>15,937 <span class=\"_ _5d\"> </span>64,513<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:686.2627px;\">Accumula<span class=\"_ _1\"/>ted deprecia<span class=\"_ _1\"/>tion and impairment<span class=\"_ _6c\"> </span><span class=\"ff1f\">(925)<span class=\"_ _79\"> </span>(1,05<span class=\"_ _1\"/>7)<span class=\"_ _13f\"> </span>(22,216)<span class=\"_ _106\"> </span>(396)<span class=\"_ _ac\"> </span>(24,594)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:671.5207px;\">Net carrying amount<span class=\"_ _ad\"> </span><span class=\"fc1\">840 <span class=\"_ _7d\"> </span>481 <span class=\"_ _a2\"> </span>23,057 <span class=\"_ _9f\"> </span>15,541 <span class=\"_ _5d\"> </span>39,919<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:656.7787px;\">Y<span class=\"_ _0\"/><span class=\"_ _2e9\">ear ended 31 December 20214<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:642.0367px;\">Carrying amount at 1 January 2021<span class=\"_ _167\"> </span><span class=\"ls7f ws9a\">74<span class=\"_ _4f\"/>9<span class=\"_ _50\"/> <span class=\"_ _f3\"> </span></span>431 <span class=\"_ _a7\"> </span>12,091 <span class=\"_ _263\"> </span>2,195 <span class=\"_ _61\"> </span>15,466<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:627.96747px;\">Additions<span class=\"_ _24b\"> </span>-<span class=\"_ _14b\"> </span>-<span class=\"_ _175\"> </span>13 <span class=\"_ _263\"> </span>2,321 <span class=\"_ _a1\"> </span>2,334<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:613.22546px;\">Disposals at written do<span class=\"_ _1\"/>wn value<span class=\"_ _251\"> </span>(2)<span class=\"_ _23\"> </span>-<span class=\"_ _69\"> </span>(6)<span class=\"_ _7d\"> </span>(22)<span class=\"_ _177\"> </span>(30)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:598.48346px;\">Depreciation and amortisation<span class=\"_ _272\"> </span>(51)<span class=\"_ _80\"> </span>(79)<span class=\"_ _10d\"> </span>(1,449)<span class=\"_ _23\"> </span>-<span class=\"_ _a\"> </span>(1,579)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:583.74146px;\"><span class=\"_ _2e9\">Impairment losses3</span><span class=\"_ _75\"> </span>(10)<span class=\"_ _23\"> </span>-<span class=\"_ _14b\"> </span>-<span class=\"_ _14b\"> </span>-<span class=\"_ _6a\"> </span>(10)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:568.99945px;\">Impairment re<span class=\"_ _1\"/>ver<span class=\"_ _1\"/><span class=\"_ _2e9\">sal3</span><span class=\"_ _1bf\"> </span>44 <span class=\"_ _7f\"> </span>66 <span class=\"_ _ec\"> </span>911 <span class=\"_ _6a\"> </span><span class=\"ls16 ws1b\">37<span class=\"_ _4f\"/> <span class=\"_ _a\"> </span></span>1,058<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:554.25745px;\">Completions and tr<span class=\"_ _1\"/>ansfers<span class=\"_ _25\"> </span>11 <span class=\"_ _6d\"> </span>108 <span class=\"_ _a6\"> </span>905 <span class=\"_ _179\"> </span>640 <span class=\"_ _78\"> </span>1,664<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:539.51544px;\">T<span class=\"_ _0\"/>ransfer to assets held f<span class=\"_ _1\"/><span class=\"_ _2e9\">or sale5</span><span class=\"_ _273\"> </span>(2)<span class=\"_ _23\"> </span>-<span class=\"_ _14b\"> </span>-<span class=\"_ _a6\"> </span>(252)<span class=\"_ _5a\"> </span>(254)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:522.5017px;\">Carrying amount at 31 December 2021<span class=\"_ _2f\"> </span><span class=\"lsa wsf\">73<span class=\"_ _4f\"/>9 <span class=\"_ _177\"> </span><span class=\"ls47 ws82\">52<span class=\"_ _4f\"/>6 <span class=\"_ _9f\"> </span></span></span>12,465 <span class=\"_ _a\"> </span>4,919 <span class=\"_ _10d\"> </span>18,649<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:501.80243px;\">At 31 Dec<span class=\"_ _1\"/><span class=\"_ _2e9\">ember 20214<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:487.06042px;\">Historical c<span class=\"_ _1\"/>ost<span class=\"_ _84\"> </span>1,701 <span class=\"_ _78\"> </span>1,495 <span class=\"_ _79\"> </span>32,<span class=\"_ _1\"/>796 <span class=\"_ _5a\"> </span>5,321 <span class=\"_ _f8\"> </span>41,313<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:472.31845px;\">Accumula<span class=\"_ _1\"/>ted deprecia<span class=\"_ _1\"/>tion and impairment<span class=\"_ _19f\"> </span>(962)<span class=\"_ _78\"> </span>(969)<span class=\"_ _14a\"> </span>(20,331)<span class=\"_ _a\"> </span>(402)<span class=\"_ _8c\"> </span>(22,664)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:455.3047px;\">Net carrying amount<span class=\"_ _28\"> </span><span class=\"lsa wsf\">739 <span class=\"_ _80\"> </span><span class=\"ls47 ws82\">526 <span class=\"_ _f0\"> </span></span></span>12,465 <span class=\"_ _a\"> </span>4,919 <span class=\"_ _61\"> </span>18,649<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:441.81226px;\">1. <span class=\"_ _29\"> </span>Acquisitions thr<span class=\"_ _1\"/>ough business combination ha<span class=\"_ _1\"/>ve been r<span class=\"_ _1\"/>ecognised on a pr<span class=\"_ _1\"/>ovisional basis. A<span class=\"_ _1\"/>djustments will be made to the pr<span class=\"_ _1\"/>ovisional amounts if ne<span class=\"_ _1\"/>w information is<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:430.89224px;\">obtained within 12 months from the acquisition da<span class=\"_ _1\"/>te. Refer t<span class=\"_ _1\"/>o Note B.5 for details. Pr<span class=\"_ _1\"/>ojects in dev<span class=\"_ _1\"/>elopment include the fair v<span class=\"_ _1\"/>alue ascribed to futur<span class=\"_ _1\"/>e phases of certain<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:419.97226px;\">projects acquir<span class=\"_ _1\"/>ed through busines<span class=\"_ _1\"/>s combinations.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:405.23026px;\">2.  Includes $3,904 million of capital additions and $294 million of capitalised borrowing c<span class=\"_ _1\"/><span class=\"_ _2e9\">osts offset by $3</span><span class=\"_ _1\"/>7<span class=\"_ _0\"/>4 million following changes in rest<span class=\"_ _1\"/>oration pr<span class=\"_ _1\"/>ovision assumptions.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:390.48825px;\">3.  Refer to Note B.<span class=\"_ _1\"/>4 for details on impairment losses and impairment r<span class=\"_ _1\"/>ev<span class=\"_ _1\"/>ersals.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:376.94745px;\">4.  Oil and gas pr<span class=\"_ _1\"/>operties includes other plant and equipment which is no longer separ<span class=\"_ _1\"/>ately present<span class=\"_ _1\"/>ed in the consolidated s<span class=\"_ _1\"/>tatement of \ufb01nancial position. The 20<span class=\"_ _1\"/>21 amounts<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:366.02744px;\">hav<span class=\"_ _1\"/>e been reclassi\ufb01ed t<span class=\"_ _1\"/>o be presented on the same basis.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:352.48666px;\">5.  Refer to Note B.<span class=\"_ _1\"/>7 for details on assets held for sale<span class=\"_ _1\"/>.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">B.3 <span class=\"_ _56\"> </span>Oil and gas properties<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">B. Pr<span class=\"_ _1\"/>oduction and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">122<span class=\"_ _24\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:356.82153px; bottom:913.2695px;\">K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:356.82153px; bottom:892.6844px;\">(a) <span class=\"_ _0\"/>Reserves<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:879.6844px;\">The estimation of reserves requires signi\ufb01cant management<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:866.6844px;\">judgement and interpretation of complex geological and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:853.6844px;\">geophysical models in order to make an assessment of the size,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:840.6844px;\">shape, depth and quality of reservoirs, and their anticipated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:356.82153px; bottom:827.6844px;\">recoveries.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:807.3107px;\">Estimates of oil and natural gas reserves are used to calculate<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:794.3107px;\">depreciation and amortisation charges for the Group\u2019s oil and gas<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:781.3107px;\">properties. Judgement is used in determining the economic reserve<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:768.3107px;\">base applied to each asset. Typically, late life oil assets use <span class=\"ws20\">proved<span class=\"_ _2e9\"> </span></span><span class=\"ws20\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:356.82153px; bottom:755.3107px;\">reserves.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:734.93713px;\">Estimates are reviewed at least annually or when there are changes<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:721.93713px;\">in the economic circumstances impacting speci\ufb01c assets or asset<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:708.93713px;\">groups. These changes may impact depreciation, asset carrying<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:695.93713px;\">values, restoration provisions and deferred tax balances. If <span class=\"ws20\">proved<span class=\"_ _2e9\"> </span></span><span class=\"ws20\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:682.93713px;\">plus probable (2P) reserves estimates are revised downwards,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:669.93713px;\"><span class=\"_ _2e9\">earnings could be affected by higher depreciation expense or an<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:656.93713px;\">immediate write-down of the asset\u2019s carrying value.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:356.82153px; bottom:632.6742px;\">(b) <span class=\"_ _13b\"/>Depreciation and amortisation<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:619.6742px;\">Judgement is required to determine when assets are available for<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:606.6742px;\">use to commence depreciation and amortisation. Depreciation and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:593.6742px;\">amortisation generally commences on \ufb01rst production.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">B.3 <span class=\"_ _56\"> </span>Oil and gas properties (c<span class=\"_ _1\"/>ont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">Recognition and measurement<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:883.93445px;\">Oil and gas properties are stated at cost less accumulated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:868.3384px;\">depreciation and impairment charges. Oil and gas properties<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:852.74225px;\">include the costs to acquire, construct, install or complete<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:837.1462px;\">production and infrastructure facilities such as pipelines and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:821.55005px;\">platforms, capitalised borrowing costs, transferred exploration  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:805.954px;\">and evaluation assets, development wells and the estimated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:790.35785px;\">cost of dismantling and restoration.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:767.39075px;\">Subsequent capital costs, including major maintenance, are<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:751.7947px;\">included in the asset\u2019s carrying amount only when it is probable<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:736.19855px;\">that future economic bene\ufb01ts associated with the item will \ufb02ow  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:720.6025px;\">to the Group and the cost of the item can be reliably measured.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:692.60913px;\">Depreciation and amortisation<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:677.00916px;\">Oil and gas properties are depreciated to their estimated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:661.4131px;\">residual values at rates based on their expected useful lives.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:638.446px;\"><span class=\"_ _2e9\">Transferred exploration and evaluation and offshore plant and<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:622.84985px;\">equipment are depreciated using the unit of production basis<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:607.2538px;\">over proved plus probable reserves or proved reserves for late<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:591.65765px;\">life assets. The depreciable amount for the unit of production<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:576.0616px;\">basis excludes future development costs necessary to bring<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:560.46545px;\"><span class=\"_ _2e9\">probable reserves into production. For certain offshore assets,<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:544.8694px;\">methodologies using proved and probable reserves are adjusted<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:529.27325px;\">to best re\ufb02ect the expected pattern of consumption. Onshore<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:513.6772px;\">plant and equipment is depreciated using a straight-line basis<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:498.08105px;\">over the lesser of useful life and the life of proved plus probable<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:482.485px;\">reserves. On a straight-line basis the assets have an estimated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:466.88885px;\">useful life of 5-50 years.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:443.92175px;\">All other items of oil and gas properties are depreciated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:428.32565px;\">using the straight-line method over their useful life. They are<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:412.72955px;\">depreciated as follows:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:389.76245px;\">\u2022 <span class=\"_ _4b\"> </span>Buildings \u2013 24-50 years;<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:370.48087px;\">\u2022 <span class=\"_ _4b\"> </span>Plant and equipment \u2013 2-40 years; and<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:351.19925px;\">\u2022 <span class=\"_ _4b\"> </span>Land is not depreciated.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:326.85883px;\">Impairment<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:311.25885px;\">Refer to Note B.4 for details on impairment.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:283.30365px;\">Capital commitments<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:267.70364px;\">The Group has capital expenditure commitments contracted  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:252.10754px;\">for, but not provided for in the \ufb01nancial statements, of  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:236.51144px;\">$7,762 million as at 31 December 2022 (2021: $7,875 million).  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:220.91534px;\">Capital expenditure commitments relate predominantly to the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:205.31924px;\">Scarborough and Sangomar projects.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">B. Pr<span class=\"_ _1\"/>oduction and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"left:651.3286px; bottom:1.4145012px;\">123<span class=\"_ _49\"/><span class=\"ff1e fc5\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4896px;\">B.4 <span class=\"_ _fd\"> </span> <span class=\"_ _274\"/>Impairment of e<span class=\"_ _1\"/>xplora<span class=\"_ _1\"/>tion and ev<span class=\"_ _1\"/>aluation, oil and gas pr<span class=\"_ _1\"/>operties and goodwill<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5346px;\">Exploration and evaluation<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:878.94946px;\">Impairment testing<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:863.3495px;\">The recoverability of the carrying amount of exploration  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:847.75336px;\">and evaluation assets is dependent on successful development<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:832.1573px;\">and commercial exploitation, or alternatively sale of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:816.56116px;\">respective AOI.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:793.59406px;\">Each AOI is reviewed half-yearly to determine whether<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:777.998px;\">economic quantities of hydrocarbons have been found, or<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:762.40186px;\">whether further exploration and evaluation work is underway<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:746.8058px;\">or planned to support continued carry forward of capitalised<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:731.20966px;\">costs. Where a potential impairment is indicated for an AOI,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:715.6136px;\">an assessment is performed using a fair value less costs to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:700.01746px;\">dispose (FVLCD) method to determine its recoverable amount.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:684.4214px;\">Upon approval for commercial development, exploration and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:668.82526px;\">evaluation assets are assessed for impairment before they are<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:653.2292px;\">transferred to oil and gas properties.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:625.2243px;\">Impairment calculations<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:609.6243px;\">The recoverable amounts of exploration and evaluation assets<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:594.0282px;\">are determined using FVLCD, as there is no value in use (VIU).<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:578.4321px;\">Costs to dispose are the incremental costs directly attributable<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:562.836px;\">to the disposal of an asset, excluding \ufb01nance costs and income<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:547.2399px;\">tax expense.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:524.2728px;\">If the carrying amount of an AOI exceeds its recoverable<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:508.6767px;\">amount, the AOI is written down to its recoverable amount and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:493.08063px;\">an impairment loss is recognised in the consolidated income<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:477.4845px;\">statement.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:454.5174px;\">For assets previously impaired, if the recoverable amount<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:438.9213px;\">exceeds the carrying amount, the impairment is reversed, but<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:423.3252px;\">only to the extent that the asset\u2019s carrying amount does not<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:407.7291px;\">exceed the carrying amount that would have been recognised  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:392.133px;\">if no impairment had occurred.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:364.12906px;\">Oil and gas properties<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:343.54395px;\">Impairment testing<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:327.94394px;\">The carrying amounts of oil and gas properties are assessed<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:312.34784px;\">half-yearly to determine whether there is an indicator of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:296.75174px;\">impairment or impairment reversal for those assets which<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:281.15564px;\">have previously been impaired. Indicators of impairment and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:265.55954px;\">impairment reversals include changes in reserves, expected<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:249.96344px;\">future sales prices or costs.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:226.99634px;\">Oil and gas properties are assessed for impairment indicators<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:211.40025px;\">and impairments on a cash-generating unit (CGU) basis. CGUs<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:195.80415px;\"><span class=\"_ _2e9\">are determined as offshore and onshore facilities, infrastructure<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:180.20805px;\">and associated oil and/or gas \ufb01elds.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:157.24095px;\">If there is an indicator of impairment or impairment reversal<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:141.64485px;\">for a CGU, its recoverable amount is calculated and compared<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:126.04875px;\">with the CGU\u2019s carrying value (refer to impairment calculations<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:109.153946px;\">below).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:899.5346px;\">Goodwill<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:883.9346px;\">For the purpose of impairment testing, goodwill acquired in a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:868.3385px;\">business combination is, from the acquisition date, allocated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:852.7424px;\">to each of the Group\u2019s cash-generating units (CGUs) that are<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:837.1463px;\">expected to bene\ufb01t from the combination, irrespective of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:821.5502px;\">whether other assets or liabilities of the acquiree are assigned to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:805.9541px;\">those units. Goodwill is tested for impairment at least annually<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:790.358px;\">and more frequently if events or changes in circumstances<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:774.7619px;\">indicate that it might be impaired. Impairment of goodwill is<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:759.1658px;\">determined by assessing the recoverable amount of each CGU<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:743.5697px;\">to which the goodwill relates and comparing it with its carrying<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:727.9736px;\">value, which includes deferred taxes (refer to impairment<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:712.3775px;\">calculations below and Note B.5).<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:689.4104px;\">When part of an operation is disposed of, any goodwill<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:673.8143px;\">associated with the disposed operation is included in the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:658.2182px;\">carrying amount of the operation in determining the gain  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:642.6221px;\">or loss on disposal.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:614.6093px;\">Goodwill and oil and gas impairment calculations<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:599.0093px;\">The recoverable amount of an asset or CGU is determined as the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:583.4132px;\">higher of its VIU and FVLCD.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:560.4461px;\">VIU is determined by estimating future cash \ufb02ows after taking<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:544.85px;\">into account the risks speci\ufb01c to the asset and discounting to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:529.2539px;\">present value using an appropriate discount rate.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:506.2868px;\">FVLCD is the price that would be received to sell the asset in an<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:490.69067px;\">orderly transaction between market participants and does not<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:475.0946px;\"><span class=\"_ _2e9\">re\ufb02ect the effects of factors that may be speci\ufb01c to the Group. In<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:459.4985px;\">determining FVLCD, recent market transactions are considered.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:443.9024px;\">If no such transactions can be identi\ufb01ed, an appropriate<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:428.3063px;\">valuation model, such as discounted cash \ufb02ow techniques,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:412.7102px;\">are applied on a post-tax basis using an appropriate discount<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:397.11407px;\">rate and estimates are made about the assumptions market<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:381.51797px;\">participants would use when pricing the asset or CGU.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:358.5509px;\">If the carrying amount of an asset or CGU, including any<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:342.9548px;\">allocated goodwill, exceeds its recoverable amount, the asset<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:327.3587px;\">or CGU is written down to its recoverable amount and an<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:311.7626px;\">impairment loss is recognised in the consolidated income<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:296.1665px;\">statement. Any impairment losses are \ufb01rst allocated to reduce<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:280.5704px;\">the carrying amount of any goodwill allocated, with the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:264.9743px;\">remaining impairment losses allocated to the relevant assets.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:242.0072px;\">If the recoverable amount of an asset or CGU exceeds its<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:226.4111px;\">carrying amount, and that asset has previously been impaired,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:210.81499px;\">the impairment is reversed. The carrying amount of the asset<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:195.21889px;\">or CGU is increased to its recoverable amount, but only to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:179.62279px;\">the extent that the carrying amount does not exceed the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:164.02669px;\">value that would have been determined, net of depreciation<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:148.43059px;\">or amortisation, if no impairment had been recognised.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:132.83449px;\">Impairments of goodwill are not reversed.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">B. Pr<span class=\"_ _1\"/>oduction and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls2f ws34\" style=\"bottom:1.4145012px;\">124<span class=\"_ _24\"> </span><span class=\"ff21 fc5 ls0 ws0\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">B.4 <span class=\"_ _fd\"> </span> <span class=\"_ _274\"/>Impairment of e<span class=\"_ _1\"/>xplora<span class=\"_ _1\"/>tion and ev<span class=\"_ _1\"/>aluation, oil and gas pr<span class=\"_ _1\"/>operties and goodwill (<span class=\"_ _1\"/>cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">For the year ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:878.94934px;\">Goodwill allocation<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:863.34937px;\">The Group performed its annual goodwill impairment test as at 31 December 2022.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:840.38226px;\">The carrying amount of goodwill allocated to each CGU, or groups of CGUs and excess recoverable amounts are as follows:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:801.04333px;\">Segment<span class=\"_ _e9\"> </span><span class=\"ls81 ws9d\">CGU<span class=\"_ _3e\"> </span></span><span class=\"_ _2e9\">Goodwill carrying amount1<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:491.6939px; bottom:810.79333px;\">Exc<span class=\"_ _1\"/>ess of rec<span class=\"_ _1\"/>ov<span class=\"_ _1\"/>erable amount o<span class=\"_ _1\"/>v<span class=\"_ _1\"/>er CGU<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:587.77484px; bottom:801.04333px;\"><span class=\"_ _2e9\">carrying amount2<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:431.21014px; bottom:786.0673px;\">US$m<span class=\"_ _275\"> </span>US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:771.0913px;\">Austr<span class=\"_ _1\"/>alia<span class=\"_ _276\"> </span>Pluto-Scarbor<span class=\"_ _1\"/>ough<span class=\"_ _255\"> </span><span class=\"ff1f\">2,955 <span class=\"_ _15a\"> </span>7<span class=\"_ _0\"/>,656<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:756.11536px;\">Austr<span class=\"_ _1\"/>alia<span class=\"_ _276\"> </span>NWS Gas<span class=\"_ _26d\"> </span><span class=\"ff1f ls6a ws83\">394<span class=\"_ _d3\"> </span>1<span class=\"_ _4f\"/>,399<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:741.13934px;\">International<span class=\"_ _118\"> </span>Shenzi<span class=\"_ _e\"> </span><span class=\"ff1f\">469 <span class=\"_ _8a\"> </span><span class=\"ls2b ws32\">401<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:726.1633px;\">International<span class=\"_ _118\"> </span>Atlantis<span class=\"_ _277\"> </span><span class=\"ff1f\"> 513 <span class=\"_ _43\"> </span><span class=\"ls14 ws19\">189<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:711.1873px;\">International<span class=\"_ _118\"> </span>Other goodwill<span class=\"_ _278\"> </span><span class=\"ff1f\">283<span class=\"_ _111\"> </span><span class=\"ls80 ws9c\">107<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:696.2113px;\">T<span class=\"_ _0\"/>otal<span class=\"_ _279\"> </span>4,614<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:681.23535px;\">1. <span class=\"_ _29\"> </span>Carrying amount of goodwill as at 31 December 2021 w<span class=\"_ _1\"/>as nil.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:666.2567px;\">2.  Amounts are with refer<span class=\"_ _1\"/>ence t<span class=\"_ _1\"/>o the total CGU v<span class=\"_ _1\"/>alue including goodwill.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:646.73px;\">Other goodwill of $283 million (2021: nil) has been allocated across a number of CGUs within the International segment.  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:631.13385px;\">This represents less than one percent of net assets as at 31 December 2022.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:603.17474px;\">Recognised impairment and impairment reversals<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:587.57477px;\">As at 31 December 2022, the Group assessed each AOI and CGU to determine whether an indicator of impairment or impairment<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:571.97864px;\">reversal existed. The Group identi\ufb01ed the following indicators of impairment reversals:<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:549.01154px;\">\u2022 <span class=\"_ _4b\"> </span>Wheatstone CGU \u2013 revision in short- and long-term LNG price assumptions and updated cost and production pro\ufb01les.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:526.04443px;\">For CGUs where goodwill has been allocated, no impairment was recognised as the recoverable amount exceeds the carrying amount<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:510.44836px;\">of the CGU.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:487.48126px;\">An impairment reversal was recognised for Wheatstone (refer to Note A.1), with results as follows:<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:423.53766px; bottom:463.24704px;\">Impairment re<span class=\"_ _1\"/>versal<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:419.6574px; bottom:444.81955px;\">Oil and gas properties<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:176.90347px; bottom:408.08154px;\">Reco<span class=\"_ _1\"/>v<span class=\"_ _1\"/>erable amount<span class=\"_ _e4\"> </span>Land and buildings<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:412.71127px; bottom:427.58154px;\">T<span class=\"_ _1\"/>r<span class=\"_ _1\"/>ansferred<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:394.6622px; bottom:417.83154px;\">explor<span class=\"_ _1\"/>ation and <span class=\"_ _27a\"/> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:416.24402px; bottom:408.08154px;\">ev<span class=\"_ _1\"/>aluation<span class=\"_ _93\"> </span>Plant and equipment<span class=\"_ _26b\"> </span>T<span class=\"_ _0\"/>otal<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:394.02203px;\">Segment<span class=\"_ _bb\"> </span><span class=\"ls81 ws9d\">CGU<span class=\"_ _27b\"> </span></span>US$m<span class=\"_ _5b\"> </span>US$m<span class=\"_ _5b\"> </span>US$m<span class=\"_ _5b\"> </span>US$m<span class=\"_ _5b\"> </span>US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:377.0083px;\">Austr<span class=\"_ _1\"/>alia<span class=\"_ _dd\"> </span>Wheatstone<span class=\"_ _20a\"> </span><span class=\"ff1f\">3,456<span class=\"_ _cd\"> </span><span class=\"ls6b ws84\">87<span class=\"_ _38\"> </span></span>30<span class=\"_ _ca\"> </span><span class=\"ls6b ws84\">783<span class=\"_ _71\"> </span></span>900<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:349.0033px;\">Recoverable amounts have been determined using the FVLCD method using discounted cash \ufb02ow projections, classi\ufb01ed as Level 3 on<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:333.4072px;\">the fair value hierarchy. The carrying amount of each CGU includes all assets allocated to the respective CGU. Refer to key estimates<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:317.8111px;\">and judgements for further details.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:289.84433px;\">Sensitivity analysis<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:274.24432px;\">Recoverable amount valuations are sensitive to changes in certain key accounting estimates and judgements (refer to key estimates<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:258.64822px;\">and judgements for further details). Reasonable possible changes to these key assumptions are set out below:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:235.68112px;\">\u2022 <span class=\"_ _4b\"> </span>Post tax discount rate \u2013 plus or minus 1.5% (representing a change of 150 basis points)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:212.71404px;\">\u2022 <span class=\"_ _4b\"> </span>Commodity pricing \u2013 plus or minus 10%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:189.74693px;\">\u2022 <span class=\"_ _4b\"> </span>Foreign exchange (FX) rate \u2013 plus or minus 12%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:166.77983px;\">\u2022 <span class=\"_ _4b\"> </span>Production volumes \u2013 plus or minus 4%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:143.81273px;\">Management\u2019s analysis on the impact of reasonable possible changes to these assumptions on recoverable amounts is detailed below.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">B. Pr<span class=\"_ _1\"/>oduction and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"left:651.3286px; bottom:1.4145012px;\">125<span class=\"_ _49\"/><span class=\"ff1e fc5\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4896px;\">B.4 <span class=\"_ _fd\"> </span>Impairment of e<span class=\"_ _1\"/>xplor<span class=\"_ _1\"/>ation and e<span class=\"_ _1\"/>v<span class=\"_ _1\"/>aluation, oil and gas properties and goodwill (<span class=\"_ _1\"/>c<span class=\"_ _1\"/>ont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5346px;\">For the year ended 31 December 2022 (cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:878.94946px;\">Sensitivity analysis (cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h61 ff1f fs3 fc1 sc0 ls0 ws0\" style=\"bottom:858.3645px;\">CGUs with impairment or impairment reversals<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:842.7684px;\"><span class=\"_ _2e9\">Changes in the following key assumptions have been estimated to result in a higher or lower carrying amount1 than what was<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:827.1723px;\">determined as at 31 December 2022:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:398.08014px; bottom:802.37244px;\"><span class=\"_ _2e9\">Sensitivity (US$m)2<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls81 ws9d\" style=\"left:1.8680992px; bottom:774.95544px;\">CGU<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:77.62248px; bottom:784.70544px;\">Discount r<span class=\"_ _1\"/>ate<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:94.74855px; bottom:774.95544px;\"><span class=\"_ _2e9\">increase\u00b3<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:158.10353px; bottom:784.70544px;\">Discount r<span class=\"_ _1\"/>ate<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:173.31223px; bottom:774.95544px;\"><span class=\"_ _2e9\">decrease\u00b3<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:242.53918px; bottom:784.70544px;\">Brent price<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:254.5621px; bottom:774.95544px;\">increase<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:318.87506px; bottom:784.70544px;\">Brent price<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:326.77267px; bottom:774.95544px;\">decrease<span class=\"_ _db\"> </span>FX increase<span class=\"_ _181\"> </span>FX increase<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:538.9228px; bottom:784.70544px;\">Production<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:546.6717px; bottom:774.95544px;\"><span class=\"_ _2e9\">increase\u2074<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:614.5106px; bottom:784.70544px;\">Production<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:619.26465px; bottom:774.95544px;\"><span class=\"_ _2e9\">decrease\u2074<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:760.89594px;\">Wheatstone<span class=\"_ _106\"> </span><span class=\"ff1f\">(117)<span class=\"_ _106\"> </span><span class=\"ls2b ws32\">127<span class=\"_ _a\"> </span></span>294<span class=\"_ _140\"> </span>(294)<span class=\"_ _174\"> </span>(79)<span class=\"_ _5d\"> </span><span class=\"ls26 ws2e\">79<span class=\"_ _13\"> </span></span>116<span class=\"_ _a9\"> </span><span class=\"ls6e ws87\">(43<span class=\"_ _4f\"/>)<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"bottom:745.8005px;\">1. <span class=\"_ _29\"> </span>Increases t<span class=\"_ _1\"/>o carrying amounts are limited t<span class=\"_ _1\"/>o historical impairment losses r<span class=\"_ _1\"/>ecognised, net of depr<span class=\"_ _1\"/>eciation and amortisation, that would ha<span class=\"_ _1\"/>ve been r<span class=\"_ _1\"/>ecognised had no<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:734.8805px;\">impairment taken plac<span class=\"_ _1\"/>e.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"bottom:722.12225px;\">2.  The sensitivities repr<span class=\"_ _1\"/>esent the reasonable possible changes to disc<span class=\"_ _1\"/>ount rat<span class=\"_ _1\"/>e, oil price, FX and pr<span class=\"_ _1\"/>oduction v<span class=\"_ _1\"/>olumes assumptions.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"bottom:709.3641px;\">3.  The relationship betw<span class=\"_ _1\"/>een the discount r<span class=\"_ _1\"/>ate and the carrying amount is non-linear and as such, sensitivities ar<span class=\"_ _1\"/>e unlikely to r<span class=\"_ _1\"/>esult in a symmetrical impact. Due t<span class=\"_ _1\"/>o the non-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:698.4441px;\">linear relationship<span class=\"_ _1\"/>, the impact of changing the discount rat<span class=\"_ _1\"/>e is likely t<span class=\"_ _1\"/>o be greater a<span class=\"_ _1\"/>t a low<span class=\"_ _1\"/>er discount rat<span class=\"_ _1\"/>e than at a higher discount r<span class=\"_ _1\"/>ate.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"bottom:685.68585px;\">4.  T<span class=\"_ _1\"/>he relationship betw<span class=\"_ _1\"/>een production and the carrying amoun<span class=\"_ _1\"/>t is non-linear due to the proportion of \ufb01x<span class=\"_ _1\"/>ed costs. Sensitivities ar<span class=\"_ _1\"/>e theref<span class=\"_ _1\"/>ore unlik<span class=\"_ _1\"/>ely to result in a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:674.76587px;\">symmetrical impact. A signi\ufb01cant change in pr<span class=\"_ _1\"/>oduction volumes w<span class=\"_ _1\"/>ould typically requir<span class=\"_ _1\"/>e a reas<span class=\"_ _1\"/>sessment of the asset concept and should not be in<span class=\"_ _1\"/>terpret<span class=\"_ _1\"/>ed in isolation.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:644.5478px;\">A change in any of the above assumptions would likely have an impact on other assumptions which, when considered together, may<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:628.95166px;\"><span class=\"_ _2e9\">offset. This does not incorporate decisions management may take in order to mitigate the change in assumptions.<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h61 ff1f fs3 fc1 sc0 ls0 ws0\" style=\"bottom:601.00037px;\">CGUs with goodwill<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:585.4043px;\">The valuation of CGUs with goodwill are most sensitive to changes in commodity prices and discount rates. Reasonably possible<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:569.80817px;\">changes in these estimates which could result in the estimated recoverable amount being equal to the carrying amount, assuming all<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:554.2121px;\">other variables are held constant, are as follows:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls81 ws9d\" style=\"left:188.49039px; bottom:509.2777px;\">CGU<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:457.55774px; bottom:526.29144px;\"><span class=\"_ _2e9\">Commodity price1</span><span class=\"_ _b5\"> </span>Nominal discount rat<span class=\"_ _1\"/>e<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:492.98016px; bottom:509.2777px;\">% change<span class=\"_ _13f\"> </span>(absolute t<span class=\"_ _1\"/>erms)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:492.26398px;\">Oil and gas properties<span class=\"_ _191\"> </span>Pluto-Scarbor<span class=\"_ _1\"/>ough<span class=\"_ _16e\"> </span><span class=\"ff1f\">N/<span class=\"_ _1\"/><span class=\"_ _2e9\">A\u00b2</span><span class=\"_ _11d\"> </span>N/<span class=\"_ _0\"/><span class=\"_ _2e9\">A\u00b2<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:478.1947px;\">Oil and gas properties<span class=\"_ _191\"> </span>NW<span class=\"_ _1\"/>S Gas<span class=\"_ _225\"> </span><span class=\"ff1f\">N/<span class=\"_ _0\"/><span class=\"_ _2e9\">A\u00b2</span><span class=\"_ _27c\"> </span>N/<span class=\"_ _0\"/><span class=\"_ _2e9\">A\u00b2<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:464.12546px;\">Oil and gas properties<span class=\"_ _191\"> </span>Shenzi<span class=\"_ _27d\"> </span><span class=\"ff1f\">(7%)<span class=\"_ _27c\"> </span><span class=\"ls82 ws9e\">N<span class=\"_ _4f\"/>/A<span class=\"_ _50\"> </span></span><span class=\"_ _2e9\">\u00b2<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:450.0562px;\">Oil and gas properties<span class=\"_ _191\"> </span>A<span class=\"_ _1\"/>tlantis<span class=\"_ _27e\"> </span><span class=\"ff1f\">(2%)<span class=\"_ _eb\"> </span>10%<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:436.00735px;\">1. <span class=\"_ _29\"> </span>Brent pric<span class=\"_ _1\"/>e applies to Pluto-Scarbor<span class=\"_ _1\"/>ough and NWS Gas. WTI price (Br<span class=\"_ _1\"/>ent - $3/bbl) applies to Shenzi and A<span class=\"_ _1\"/>tlantis.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:422.46655px;\">2.  Management considers there to be no r<span class=\"_ _1\"/>easonably possible change in the r<span class=\"_ _1\"/>espective estimat<span class=\"_ _1\"/>e which, in isolation, would r<span class=\"_ _1\"/>esult in the estimated r<span class=\"_ _1\"/>eco<span class=\"_ _1\"/>ver<span class=\"_ _1\"/>able amount being<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:411.54657px;\">equal to the carrying amount.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:391.93033px;\"><span class=\"_ _2e9\">A change in any of the above assumptions would have an impact on other assumptions which when considered together may offset.<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:376.33423px;\">This does not incorporate decisions management may take in order to mitigate the change in assumptions. Management considers<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:360.73813px;\">there to be no reasonably possible changes in production volumes, carbon prices or foreign exchange rates that would, in isolation<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:345.14203px;\">result in the estimated recoverable amount being equal to the carrying amount. Analysis of key assumptions which could result in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:329.54593px;\">the carrying value to equal the recoverable value provides a basis to assess the magnitude of a reasonable possible change to the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:313.94983px;\">carrying amounts of respective CGUs.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">B. Pr<span class=\"_ _1\"/>oduction and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:14.028687px; bottom:263.83652px;\">K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc5 ff1f fs56 fce sc0 ls0 ws0\" style=\"left:14.028687px; bottom:243.25156px;\">CGU det<span class=\"_ _1\"/>ermination<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:230.25156px;\">Identi\ufb01cation of a CGU requires management judgement. In<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:217.25156px;\">determining CGUs for acquired assets during the reporting period,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:204.25156px;\">management has assessed based on the smallest group of assets that<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:191.25156px;\">generate signi\ufb01cant cash in\ufb02ows that are independent from other<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:178.25156px;\">assets or groups of assets.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc5 ff1f fs56 fce sc0 ls0 ws0\" style=\"left:14.028687px; bottom:153.98146px;\">Allocation of goodwill<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:140.98146px;\">Allocation of goodwill to the relevant CGUs requires management<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:127.98146px;\">judgement. The goodwill arising from the merger has been allocated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:114.98146px;\">to relevant CGUs which are expected to bene\ufb01t from the expected<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:101.98146px;\">synergies as a result of the merger.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc5 ff1f fs56 fce sc0 ls0 ws0\" style=\"left:14.028687px; bottom:77.71137px;\">Reco<span class=\"_ _1\"/>v<span class=\"_ _1\"/>er<span class=\"_ _1\"/>able amount calculation ke<span class=\"_ _1\"/>y assumptions<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:64.71137px;\">In determining the recoverable amount of CGUs, estimates are made<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:51.711372px;\">regarding the present value of future cash \ufb02ows when determining the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:247.14816px;\">FVLCD. These estimates require signi\ufb01cant management judgement<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:234.14816px;\">and are subject to risk and uncertainty, and hence changes in economic<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:221.14816px;\"><span class=\"_ _2e9\">conditions can also affect the assumptions used and the rates used to<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:208.14816px;\">discount future cash \ufb02ow estimates.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:187.77457px;\">The basis for each estimate used to determine recoverable amounts as<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:174.77457px;\">at 31 December 2022 is set out below:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:342.73032px; bottom:154.40097px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">Resource estimates \u2013 2P and a portion of 2C reserves (where<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:141.40097px;\">applicable) for oil and gas properties. The reserves are as disclosed<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:128.40097px;\">in the Reserves and Resources Statement in the 31 December 2022<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:115.40097px;\">Annual Report.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:342.73032px; bottom:96.868164px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">In\ufb02ation rate \u2013 an in\ufb02ation rate of 2.0% has been applied for US<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:83.86817px;\">based assets and 2.5% for Australian based assets.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:342.73032px; bottom:65.34577px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">Foreign exchange rates \u2013 a rate of $0.75 US$:AU$ is based on<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:52.34577px;\">management\u2019s view of long-term exchange rates.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls31 ws35\" style=\"bottom:1.4145012px;\">126<span class=\"_ _24\"> </span><span class=\"ff21 fc5 ls0 ws0\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:521.9183px;\">For the year ended 31 December 2021<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:501.33313px;\">Recognised impairment and impairment reversals<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:485.73315px;\">As at 31 December 2021, the Group identi\ufb01ed the following indicators for impairment and impairment reversals:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:462.76605px;\">\u2022 <span class=\"_ _4b\"> </span>Pluto-Scarborough and Wheatstone CGU \u2013 a reduction of 2P total reserves within the Greater Pluto and Wheatstone reserves and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:447.16995px;\">resources estimates.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:427.88834px;\">\u2022 <span class=\"_ _4b\"> </span>Pluto-Scarborough CGU \u2013 additional value generated by Scarborough and Pluto Train 2, which have been combined with Pluto into<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:412.29224px;\">a new Pluto-Scarborough CGU following the \ufb01nal investment decision for Scarborough and Pluto Train 2 in November 2021.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:393.01065px;\">\u2022 <span class=\"_ _4b\"> </span>North West Shelf CGU \u2013 updated cost and production pro\ufb01les, including the impact of third-party processing agreements, and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:377.41455px;\">short-term pricing assumptions.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:358.13293px;\">\u2022 <span class=\"_ _4b\"> </span>NWS Oil (Okha) CGU \u2013 the reclassi\ufb01cation to a late life oil asset due to natural reservoir decline and short-term pricing assumptions.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:338.85135px;\">No impairment was recognised for Wheatstone and NWS Oil (Okha) as the recoverable amount exceeds the carrying amount  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:323.25525px;\">of the CGU.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:300.28815px;\">Impairment reversals were recognised for Pluto-Scarborough and NWS Gas (refer to Note A.1). The results were as follows:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:409.06503px; bottom:276.03534px;\">Impairment re<span class=\"_ _1\"/>versal<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:405.52304px; bottom:257.60785px;\">Oil and gas properties<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:183.01842px; bottom:217.61334px;\">Reco<span class=\"_ _1\"/>v<span class=\"_ _1\"/>erable<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:203.88016px; bottom:207.86334px;\">amount<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:278.75848px; bottom:217.61334px;\">Land and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:278.75848px; bottom:207.86334px;\">buildings<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:352.21954px; bottom:227.36334px;\">T<span class=\"_ _1\"/>r<span class=\"_ _1\"/>ansferred<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:333.6506px; bottom:217.61334px;\">explor<span class=\"_ _1\"/>ation and <span class=\"_ _27a\"/> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:207.86334px;\">ev<span class=\"_ _1\"/>aluation<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:444.55542px; bottom:217.61334px;\">Plant and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:439.53442px; bottom:207.86334px;\">equipment<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:527.3599px; bottom:217.61334px;\">Projects in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:516.4449px; bottom:207.86334px;\">dev<span class=\"_ _1\"/>elopment<span class=\"_ _78\"> </span>T<span class=\"_ _1\"/>otal<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:193.80383px;\">Segment<span class=\"_ _b7\"> </span><span class=\"ls81 ws9d\">CG<span class=\"_ _4f\"/>U<span class=\"_ _20f\"> </span></span><span class=\"fc1\">US$m<span class=\"_ _a4\"> </span>US$m<span class=\"_ _79\"> </span>US$m<span class=\"_ _10b\"> </span>US$m<span class=\"_ _f8\"> </span>US$m<span class=\"_ _10b\"> </span>US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:176.79008px;\">Producing and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:167.04008px;\">Dev<span class=\"_ _1\"/>elopment<span class=\"_ _df\"> </span>Plut<span class=\"_ _1\"/>o-Scarborough<span class=\"_ _ab\"> </span> 17<span class=\"_ _1\"/>,4<span class=\"_ _1\"/>7<span class=\"_ _0\"/>4 <span class=\"_ _13\"> </span><span class=\"ls7d ws98\"> 42 <span class=\"_ _179\"> </span><span class=\"ls6 wsa\"> 53 <span class=\"_ _263\"> </span><span class=\"ls6b ws84\"> 563<span class=\"_ _6a\"> </span><span class=\"ls60 ws6e\"> 24 <span class=\"_ _13\"> </span></span></span></span></span>682<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:150.02634px;\">Producing<span class=\"_ _b1\"> </span>North W<span class=\"_ _1\"/>est Shelf<span class=\"_ _179\"> </span>2,425<span class=\"_ _173\"> </span>2<span class=\"_ _6a\"> </span>13<span class=\"_ _177\"> </span>348<span class=\"_ _175\"> </span>13<span class=\"_ _7c\"> </span><span class=\"ls80 ws9c\">376<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:75.60254px; bottom:132.69084px;\">T<span class=\"_ _0\"/>otal<span class=\"_ _113\"> </span><span class=\"ff20 fc1\">19,899<span class=\"_ _f3\"> </span>44<span class=\"_ _f3\"> </span>66<span class=\"_ _7f\"> </span>911<span class=\"_ _26b\"> </span><span class=\"ls16 ws1b\">37<span class=\"_ _5a\"> </span></span>1,058<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:101.55844px;\">The recoverable amounts were determined using the VIU method. The carrying amounts of the CGUs include all assets allocated to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:85.96234px;\">the CGU. Refer to key estimates and judgements for further details.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">B. Pr<span class=\"_ _1\"/>oduction and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:14.028687px; bottom:863.29706px;\">K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements (<span class=\"_ _1\"/>c<span class=\"_ _1\"/>ont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc5 ff1f fs56 fce sc0 ls0 ws0\" style=\"left:14.028687px; bottom:842.712px;\">Reco<span class=\"_ _1\"/>v<span class=\"_ _1\"/>er<span class=\"_ _1\"/>able amount calculation ke<span class=\"_ _1\"/>y assumptions (<span class=\"_ _1\"/>cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:14.028687px; bottom:822.342px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">Discount rates \u2013 a range of post-tax discount rates between 8%<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:809.342px;\">and 11.5% for CGUs has been applied. The discount rate re\ufb02ects an<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:796.342px;\">assessment of the risks speci\ufb01c to the asset.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:14.028687px; bottom:777.8196px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">Carbon pricing \u2013 a long-term price of US$80/tonne of emissions<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:764.8196px;\">(real terms 2022) is based on management\u2019s assumptions on<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:751.8196px;\">carbon cost pricing and incorporates an evaluation of climate risk.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:738.8196px;\">This is applicable to Australian emissions that exceed facility-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:725.8196px;\">speci\ufb01c baselines in accordance with Australian regulations, as well<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:712.8196px;\">as global emissions that exceed voluntary corporate net emissions<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:699.8196px;\">targets. Woodside continues to monitor the uncertainty around<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:686.8196px;\">climate change risks and will revise carbon pricing assumptions<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:673.8196px;\">accordingly. Refer to Climate change and energy transition section<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:660.8196px;\">within the basis of preparation for further information.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:14.028687px; bottom:642.2868px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">LNG price \u2013 the majority of LNG sales contracts are linked to an oil<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:629.2868px;\">price marker; accordingly the LNG prices used are consistent with<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:616.2868px;\">oil price assumptions.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:14.028687px; bottom:597.754px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">Brent oil prices \u2013 derived from long-term views of global supply<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:584.754px;\">and demand, building upon past experience of the industry and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:571.754px;\">consistent with external sources. Prices are adjusted for premiums<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:822.3316px;\">and discounts based on the nature and quality of the product. Brent<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:809.3316px;\">oil price estimates have considered the risk of climate policies along<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:796.3316px;\">with other factors such as industry investment and cost trends.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:783.3316px;\">There is signi\ufb01cant uncertainty around how society will respond<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:770.3316px;\">to the climate challenge; Woodside\u2019s pricing assumptions re\ufb02ect<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:757.3316px;\">a \u2018best estimate\u2019 scenario in which global governments pursue<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:744.3316px;\">decarbonisation as well as other goals such as energy security<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:731.3316px;\">and economic development. As with carbon pricing, Woodside<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:718.3316px;\">continues to monitor this uncertainty and will revise its oil pricing<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:705.3316px;\">assumptions accordingly in its transition to a lower carbon<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:692.3316px;\">economy. Further information on climate change risk is provided <span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:679.3316px;\">in the Climate change and energy transition section within the basis<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:666.3316px;\">of preparation. The nominal Brent oil prices (US$/bbl) used were:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:446.7428px; bottom:647.36005px;\">202<span class=\"_ _4f\"/>3<span class=\"_ _17\"> </span>2024<span class=\"_ _52\"> </span>202<span class=\"_ _4f\"/>5<span class=\"_ _17\"> </span>202<span class=\"_ _4f\"/>6<span class=\"_ _41\"> </span>202<span class=\"_ _4f\"/>7<span class=\"_ _41\"> </span>2028<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:358.33005px; bottom:633.29083px;\"><span class=\"_ _2e9\">31 December 20221</span><span class=\"_ _f9\"> </span><span class=\"ls6b ws84\">87<span class=\"_ _db\"> </span>78<span class=\"_ _db\"> </span><span class=\"ls83 ws9f\">74<span class=\"_ _f6\"> </span><span class=\"ls72 ws8b\">76<span class=\"_ _db\"> </span></span></span></span>77<span class=\"_ _d6\"> </span><span class=\"ls26 ws2e\">79<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:358.33005px; bottom:619.22156px;\"><span class=\"_ _2e9\">31 December 20212</span><span class=\"_ _d9\"> </span><span class=\"ls84 wsa0\">71<span class=\"_ _d6\"> </span></span>68<span class=\"_ _d6\"> </span><span class=\"ls47 ws82\">69<span class=\"_ _db\"> </span><span class=\"ls72 ws8b\">70<span class=\"_ _f6\"> </span><span class=\"ls6e ws87\">72<span class=\"_ _f6\"> </span><span class=\"lsa wsf\">73<span class=\"_ _2e9\"> </span></span></span></span></span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:358.33005px; bottom:608.2662px;\">1. <span class=\"_ _29\"> </span> <span class=\"_ _4c\"/>Long-term oil prices ar<span class=\"_ _1\"/>e based on US$7<span class=\"_ _1\"/>0/bbl (2022 r<span class=\"_ _1\"/>eal terms) fr<span class=\"_ _1\"/>om<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:369.93542px; bottom:597.3462px;\">2025 and prices ar<span class=\"_ _1\"/>e escalated at 2.<span class=\"_ _1\"/>0% onwar<span class=\"_ _1\"/>ds.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:358.33005px; bottom:584.588px;\">2.  Long-term oil prices ar<span class=\"_ _1\"/>e based on US$65/bbl (2022 r<span class=\"_ _1\"/>eal terms) fr<span class=\"_ _1\"/>om<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:369.93542px; bottom:573.668px;\">202<span class=\"_ _1\"/>4 and prices are escalat<span class=\"_ _1\"/>ed at 2.0% onw<span class=\"_ _1\"/>ards.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">B.4 <span class=\"_ _fd\"> </span> <span class=\"_ _274\"/>Impairment of e<span class=\"_ _1\"/>xplora<span class=\"_ _1\"/>tion and ev<span class=\"_ _1\"/>aluation, oil and gas pr<span class=\"_ _1\"/>operties and goodwill (<span class=\"_ _1\"/>cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">For the year ended 31 December 2022 (cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls25 ws2b\" style=\"left:651.3286px; bottom:1.4145012px;\">127<span class=\"_ _49\"/><span class=\"ff1e fc5 ls0 ws0\">W<span class=\"_ _1\"/>oodside Energy Group L<span class=\"_ _1\"/>td      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">B. Pr<span class=\"_ _1\"/>oduction and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">B.4 <span class=\"_ _fd\"> </span> <span class=\"_ _274\"/>Impairment of e<span class=\"_ _1\"/>xplora<span class=\"_ _1\"/>tion and ev<span class=\"_ _1\"/>aluation, oil and gas pr<span class=\"_ _1\"/>operties and goodwill (<span class=\"_ _1\"/>cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">For the year ended 31 December 2021 (cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:878.94934px;\">Sensitivity analysis<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:863.34937px;\"><span class=\"_ _2e9\">Changes in the following key assumptions were estimated to result in a higher or lower carrying amounts1 than what was </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:847.75323px;\">determined as at 31 December 2021:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:384.89713px; bottom:822.9573px;\"><span class=\"_ _2e9\">Sensitivity (US$m)2<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:207.1741px; bottom:805.2903px;\">Discount r<span class=\"_ _1\"/>ate:<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:198.25533px; bottom:795.5403px;\">increase of 1%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hd4 ff1f fs54 fc1 sc0 ls32 ws3a\" style=\"left:258.5085px; bottom:798.79144px;\">3,4<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:284.74796px; bottom:805.29474px;\">Discount r<span class=\"_ _1\"/>ate:<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:281.6402px; bottom:795.54474px;\">decrease of 1%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:373.32114px; bottom:805.29474px;\">Brent price:<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:356.82153px; bottom:795.54474px;\">increase of 10%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:450.57858px; bottom:805.29474px;\">Brent price:<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:432.3444px; bottom:795.54474px;\">decrease of 10%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:565.81995px; bottom:805.29474px;\">FX: <span class=\"_ _27a\"/> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:510.64142px; bottom:795.54474px;\"><span class=\"_ _2e9\">increase of 12%5<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:643.1339px; bottom:805.29474px;\">FX: <span class=\"_ _27a\"/> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:589.6319px; bottom:795.54474px;\">decrease of 12%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:778.53094px;\">Oil and gas<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:768.78094px;\">properties<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:55.711433px; bottom:778.53094px;\">Producing and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:55.711433px; bottom:768.78094px;\">Dev<span class=\"_ _1\"/>elopment<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:116.53487px; bottom:778.53094px;\">Pluto-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:116.53487px; bottom:768.78094px;\">Scarborough<span class=\"_ _cc\"> </span>-<span class=\"_ _6a\"> </span>-<span class=\"_ _6a\"> </span>-<span class=\"_ _6a\"> </span>-<span class=\"_ _6a\"> </span>-<span class=\"_ _6a\"> </span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:55.711433px; bottom:754.71173px;\">Producing<span class=\"_ _c5\"> </span>North W<span class=\"_ _1\"/>est Shelf<span class=\"_ _171\"> </span>-<span class=\"_ _6a\"> </span>-<span class=\"_ _6a\"> </span>-<span class=\"_ _13\"> </span>(13)<span class=\"_ _6d\"> </span>-<span class=\"_ _6a\"> </span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:116.53487px; bottom:740.64246px;\">Wheatstone<span class=\"_ _16a\"> </span>(159)<span class=\"_ _9d\"> </span><span class=\"ls47 ws82\">178<span class=\"_ _217\"> </span><span class=\"ls7d ws98\">438<span class=\"_ _f0\"> </span></span></span>(438)<span class=\"_ _61\"> </span>(122)<span class=\"_ _9d\"> </span>122<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:116.53487px; bottom:726.57324px;\">NWS Oil (<span class=\"_ _1\"/>Okha)<span class=\"_ _6a\"> </span><span class=\"ls6e ws87\">(4)<span class=\"_ _80\"> </span></span>4<span class=\"_ _a6\"> </span><span class=\"ls6a ws83\">39<span class=\"_ _5a\"> </span></span>(39)<span class=\"_ _a7\"> </span>(28)<span class=\"_ _5a\"> </span>28<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"bottom:711.4936px;\">1. <span class=\"_ _29\"> </span>Increases t<span class=\"_ _1\"/>o carrying amounts are limited t<span class=\"_ _1\"/>o historical impairment losses r<span class=\"_ _1\"/>ecognised, net of depr<span class=\"_ _1\"/>eciation and amortisation that would ha<span class=\"_ _1\"/>ve been incurr<span class=\"_ _1\"/>ed had no<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:700.5736px;\">impairment taken plac<span class=\"_ _1\"/>e.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"bottom:687.8154px;\">2.  The sensitivities repr<span class=\"_ _1\"/>esent reasonable possible changes to the disc<span class=\"_ _1\"/>ount rat<span class=\"_ _1\"/>e, oil price and FX assumptions.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"bottom:675.0572px;\">3.  A change of 1% represents 100 basis points.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"bottom:662.299px;\">4.  T<span class=\"_ _1\"/>he relationship betw<span class=\"_ _1\"/>een the discount r<span class=\"_ _1\"/>ate and carrying amount is non-linear and as such, the sensitivities ar<span class=\"_ _1\"/>e unlikely to r<span class=\"_ _1\"/>esult in a symmetrical impact. Due t<span class=\"_ _1\"/>o the  </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:651.379px;\">non-linear relationship<span class=\"_ _1\"/>, the impact of changing the discount rat<span class=\"_ _1\"/>e is likely t<span class=\"_ _1\"/>o be greater a<span class=\"_ _1\"/>t a low<span class=\"_ _1\"/>er discount rat<span class=\"_ _1\"/>e than at a higher discount r<span class=\"_ _1\"/>ate.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"bottom:638.6208px;\">5.  FX sensitivity of +12%/-12% w<span class=\"_ _1\"/>as determined based on historical 5-<span class=\"_ _1\"/>year s<span class=\"_ _1\"/>tandard de<span class=\"_ _1\"/>viation of AU$/US$.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:599.28125px;\">Impairment on non-current assets held for sale<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:583.676px;\">The sale of a portion of the Wheatstone Construction Village resulted in an impairment loss of $10 million as the asset\u2019s carrying value<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:568.07996px;\">exceeded its FVLCD, which was determined based on the underlying sale agreements, classi\ufb01ed as Level 3 on the fair value hierarchy.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:552.4838px;\">For the year ended 31 December 2021, an impairment loss of $10 million was recognised in the Australia operating segment of  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:536.88776px;\">Note A.1.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:14.028687px; bottom:493.03693px;\">K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc5 ff1f fs56 fce sc0 ls0 ws0\" style=\"left:14.028687px; bottom:472.4518px;\">CGU det<span class=\"_ _1\"/>ermination<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:459.4518px;\">Identi\ufb01cation of a CGU requires management judgement. For the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:446.4518px;\">year ended 31 December 2021, management has determined that the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:433.4518px;\">Scarborough and Pluto Train 2 development concept integrates with<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:420.4518px;\">the existing Pluto onshore assets and is the smallest group of assets<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:407.4518px;\">that generate signi\ufb01cant cash in\ufb02ows that are independent from other<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:394.4518px;\">assets or group of assets.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc5 ff1f fs56 fce sc0 ls0 ws0\" style=\"left:14.028687px; bottom:370.18173px;\">Reco<span class=\"_ _1\"/>v<span class=\"_ _1\"/>er<span class=\"_ _1\"/>able amount calculation ke<span class=\"_ _1\"/>y assumptions<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:357.18173px;\">In determining the recoverable amount of CGUs, estimates are made<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:344.18173px;\">regarding the present value of future cash \ufb02ows when determining<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:331.18173px;\">the VIU. These estimates require signi\ufb01cant management judgement<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:318.18173px;\">and are subject to risk and uncertainty, and hence changes in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:305.18173px;\"><span class=\"_ _2e9\">economic conditions can also affect the assumptions used and </span><span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:292.18173px;\">the rates used to discount future cash \ufb02ow estimates.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:271.80814px;\">The basis for each estimate used to determine recoverable amounts<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:258.80814px;\">as at 31 December 2021 is set out below:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:14.028687px; bottom:238.43454px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">Resource estimates \u2013 2P reserves for oil and gas properties, except<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:225.43454px;\">for NWS Oil (Okha) which is based on 1P reserves due to the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:212.43452px;\">reclassi\ufb01cation to a late life asset. The reserves are as disclosed in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:199.43452px;\">the Reserves and resources statement in the 31 December 2021<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:186.43452px;\">Annual Report on pag<span class=\"ls0\">e</span>s 55-59.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:14.028687px; bottom:167.90173px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">In\ufb02ation rate \u2013 an in\ufb02ation rate of 2.0% has been applied.<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:14.028687px; bottom:149.36893px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">Foreign exchange rates \u2013 a rate of $0.75 US$:AU$ is based on<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:136.36893px;\">management\u2019s view of long-term exchange rates.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:14.028687px; bottom:117.84653px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">Discount rates \u2013 a range of pre-tax discount rates between 8.9%<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:104.84653px;\">and 11.6% (post-tax discount rate 7.5%-8.5%) for CGUs has been<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:91.84653px;\">applied. The discount rate re\ufb02ects an assessment of the risks<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:25.815529px; bottom:78.84653px;\">speci\ufb01c to the asset.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:345.46844px; bottom:496.6665px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">An evaluation of climate risk is re\ufb02ected in Woodside's assumptions<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:483.6665px;\">on carbon cost pricing, including a long-term Australian carbon<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:470.66653px;\">price of US$80/tonne of emissions (real terms 2022). This is<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:457.66653px;\">applicable to Australian emissions that exceed facility-speci\ufb01c<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:444.66653px;\">baselines in accordance with Australian regulations, as well as<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:431.66653px;\">global emissions that exceed voluntary corporate net emissions<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:418.66653px;\">targets. Woodside continues to monitor the uncertainty around<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:405.66653px;\">climate change risks and will revise carbon pricing assumptions<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:356.82153px; bottom:392.66653px;\">accordingly.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:345.46844px; bottom:374.13373px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">LNG price \u2013 the majority of LNG sales contracts are linked to an oil<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:361.13373px;\">price marker; accordingly the LNG prices used are consistent with<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:348.13373px;\">oil price assumptions.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:345.46844px; bottom:329.60092px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">Brent oil prices \u2013 derived from long-term views of global supply<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:316.60092px;\">and demand, building upon past experience of the industry and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:303.60092px;\">consistent with external sources. Prices are adjusted for premiums<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:290.60092px;\">and discounts based on the nature and quality of the product.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:277.60092px;\">Brent oil price estimates have considered the risk of climate policies<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:264.60092px;\">along with other factors such as industry investment and cost<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:251.60092px;\">trends. There is signi\ufb01cant uncertainty around how society will<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:238.60092px;\">respond to the climate challenge; Woodside\u2019s pricing assumptions<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:225.60092px;\">re\ufb02ect a \u2018most-likely\u2019 scenario in which global governments pursue<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:212.60094px;\">decarbonisation as well as other goals such as energy security<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:199.60094px;\">and economic development. As with carbon pricing, Woodside<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:186.60094px;\">continues to monitor this uncertainty and will revise its oil pricing<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:173.60094px;\">assumptions accordingly in its transition to a lower carbon<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:160.60094px;\">economy. Further information on climate change risk is provided <span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:147.60094px;\">in Woodside\u2019s Climate Report 2021. The nominal Brent oil prices <span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:134.60094px;\">(US$/bbl) used were:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:446.7428px; bottom:115.639786px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _41\"> </span>2023<span class=\"_ _41\"> </span>2024<span class=\"_ _41\"> </span>2<span class=\"_ _4f\"/>025<span class=\"_ _41\"> </span>2026<span class=\"_ _52\"> </span>2027<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:358.33005px; bottom:101.570526px;\"><span class=\"_ _2e9\">31 December 20211</span><span class=\"_ _c5\"> </span><span class=\"lsa wsf\">73<span class=\"_ _54\"> </span><span class=\"ls84 wsa0\">71<span class=\"_ _b3\"> </span></span></span>68<span class=\"_ _b3\"> </span><span class=\"ls6b ws84\">69<span class=\"_ _b3\"> </span><span class=\"ls70 ws89\">70<span class=\"_ _f6\"> </span><span class=\"ls71 ws8a\">72<span class=\"_ _2e9\"> </span></span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:358.33005px; bottom:87.51103px;\"><span class=\"_ _2e9\">30 June 20202</span><span class=\"_ _fa\"> </span><span class=\"ls7e ws99\">57<span class=\"_ _db\"> </span><span class=\"ls6c ws85\">62<span class=\"_ _f6\"> </span><span class=\"ls4 ws8\">67<span class=\"_ _f6\"> </span><span class=\"ls6e ws87\">72<span class=\"_ _f6\"> </span><span class=\"lsa wsf\">73<span class=\"_ _f6\"> </span><span class=\"ls72 ws8b\">75<span class=\"_ _2e9\"> </span></span></span></span></span></span></span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:358.33005px; bottom:76.54605px;\">1. <span class=\"_ _29\"> </span>Based on US$65/bbl (2022 r<span class=\"_ _1\"/>eal terms) fr<span class=\"_ _1\"/>om 202<span class=\"_ _1\"/>4 with prices escalated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:369.93542px; bottom:65.62605px;\">at 2.0% annually ther<span class=\"_ _1\"/>eafter<span class=\"_ _0\"/>.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:358.33005px; bottom:52.86785px;\">2.  Based on US$65/bbl (2020 real terms<span class=\"_ _1\"/>) from 20<span class=\"_ _1\"/>25 with prices escalated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:369.93542px; bottom:41.947853px;\">at 2.0% annually ther<span class=\"_ _1\"/>eafter<span class=\"_ _0\"/>.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">128<span class=\"_ _24\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">B.5 <span class=\"_ _56\"> </span>Business combination<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">BHP Petroleum merger<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:883.93445px;\">On 17 August 2021, Woodside and BHP Group (BHP) entered<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:868.3384px;\">into a merger commitment deed to combine their respective<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:852.74225px;\">oil and gas portfolios by an all-stock merger. The Share Sale<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:837.1462px;\">Agreement (SSA) and the integration and transition services<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:821.55005px;\">agreement were executed on 22 November 2021. Under the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:805.954px;\"><span class=\"_ _2e9\">SSA, the merger took economic effect from 1 July 2021 and<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:790.35785px;\">Woodside became entitled to the economic bene\ufb01ts and risks<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:774.7618px;\">of the assets and liabilities that were the subject of the merger<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:759.16565px;\">from that date.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:736.19855px;\">On 19 May 2022, 98.66% of Woodside shareholders voted in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:720.6025px;\">favour of the merger at Woodside\u2019s Annual General Meeting.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:697.6354px;\">On 1 June 2022, the transaction was completed with the Group<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:682.03925px;\">acquiring 100% of the issued share capital of BHP Petroleum<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:666.4432px;\">International Pty Ltd (subsequently renamed Woodside Energy<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:650.84705px;\">Global Holdings Pty Ltd), which held BHP\u2019s oil and gas business.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:635.251px;\">In exchange, the Group issued 914,768,948 new Woodside<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:619.65485px;\">shares to BHP as part of the merger consideration. The<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:604.0588px;\">transaction has been accounted for as a business combination<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:588.46265px;\">with an acquisition date of 1 June 2022. The Group\u2019s net pro\ufb01t<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:572.8666px;\">after tax for the year ended 31 December 2022 incorporates<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:557.27045px;\">BHPP results from acquisition date. The merger is expected to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:541.6744px;\">create opportunities to realise ongoing synergies.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:518.7073px;\">Due to the size, complexity and timing of the transaction, the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:503.11115px;\">assets acquired and liabilities assumed are measured on a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:487.51508px;\">provisional basis. As at 31 December 2022, the Allocable Cost<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:471.91895px;\">Amount (ACA) tax valuation process has been substantially<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:456.32285px;\">completed with potential adjustments if new information is<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:440.72675px;\">obtained within 12 months from the acquisition date about<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:425.13065px;\">facts and circumstances that existed at the acquisition<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:409.53455px;\">date. Adjustments will be made to the provisional amounts<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:393.93845px;\">recognised including the value of goodwill.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:370.97134px;\"><span class=\"_ _2e9\">The merged Group\u2019s \ufb01nancial results could be adversely affected<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:355.37524px;\">by impairments of goodwill or other intangible assets, the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:339.77914px;\">application of future accounting policies or interpretations of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:324.18304px;\">existing accounting policies including by regulatory direction,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:308.58694px;\">and changes in estimates of decommissioning costs. Details<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:292.99084px;\">and risks have been included in the Merger Explanatory<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:277.39474px;\">Memorandum released on 8 April 2022.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:254.42764px;\">Given the purchase consideration was agreed on 22 November<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:238.83154px;\">2021 based on a \ufb01xed number of shares, the \ufb01nal value of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:223.23544px;\">consideration paid was subject to \ufb02uctuations in share price<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:207.63934px;\">until completion on 1 June 2022. This has resulted in a material<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:192.04324px;\">goodwill number which will be subject to impairment in future,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:176.44714px;\">for example should commodity prices decrease.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:900.99304px;\">Details of the purchase consideration and the provisional fair<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:885.397px;\">value of goodwill, identi\ufb01able assets and liabilities of BHPP<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:869.80084px;\">acquired are as follows:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:846.9223px;\">Pro<span class=\"_ _1\"/>visional fair v<span class=\"_ _1\"/>alue of net identi\ufb01able assets and goodwill<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:837.1723px;\">arising on acquisition date<span class=\"_ _19e\"> </span><span class=\"fc1\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:823.103px;\">Cash and cash equivalents <span class=\"_ _27f\"> </span><span class=\"ff1f\">399<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:809.03375px;\">Receiv<span class=\"_ _1\"/>ables<span class=\"_ _280\"> </span><span class=\"ff1f\">1,<span class=\"_ _1\"/>164<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:794.96454px;\">Inv<span class=\"_ _1\"/>entories<span class=\"_ _b\"> </span><span class=\"ff1f\">295<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:780.89526px;\">Inv<span class=\"_ _1\"/>estments acc<span class=\"_ _1\"/>ounted for using the equity method<span class=\"_ _d0\"> </span><span class=\"ff1f ls70 ws89\">267<span class=\"_ _2e9\"> </span></span><span class=\"ff1f ls70 ws89\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:766.82605px;\">Other \ufb01nancial assets<span class=\"_ _1c\"> </span><span class=\"ff1f ls6a ws83\">59<span class=\"_ _2e9\"> </span></span><span class=\"ff1f ls6a ws83\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:752.7568px;\">Other assets<span class=\"_ _281\"> </span><span class=\"ff1f\">114<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:738.6875px;\">Exploration and e<span class=\"_ _1\"/>valua<span class=\"_ _1\"/>tion assets<span class=\"_ _f1\"> </span><span class=\"ff1f\">180<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:724.6183px;\">Oil and gas properties<span class=\"_ _282\"> </span><span class=\"ff1f ls6a ws83\">19,353<span class=\"_ _2e9\"> </span></span><span class=\"ff1f ls6a ws83\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:710.549px;\">Lease assets<span class=\"_ _16e\"> </span><span class=\"ff1f\">142<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:696.4798px;\">Pay<span class=\"_ _1\"/>ables<span class=\"_ _224\"> </span><span class=\"ff1f\">(910)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:682.4105px;\">Pro<span class=\"_ _1\"/>visions<span class=\"_ _d\"> </span><span class=\"ff1f\">(4,804)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:668.3413px;\">T<span class=\"_ _0\"/>ax pay<span class=\"_ _1\"/>able<span class=\"_ _283\"> </span><span class=\"ff1f\">(365)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:654.27203px;\">Deferred tax liabilities<span class=\"_ _19\"> </span><span class=\"ff1f\">(5<span class=\"_ _1\"/>76)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:640.20276px;\">Lease liabilities<span class=\"_ _155\"> </span><span class=\"ff1f\">(268)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:626.13354px;\">Other liabilities<span class=\"_ _228\"> </span><span class=\"ff1f\">(1,054)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:612.0643px;\">Net identi\ufb01able assets acquir<span class=\"_ _1\"/>ed <span class=\"_ _68\"> </span><span class=\"ff1f\">13,996<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:597.99506px;\">Goodwill arising on acquisition <span class=\"_ _37\"> </span><span class=\"ff1f\">4,614<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:583.93555px;\">Purchase c<span class=\"_ _1\"/>onsideration<span class=\"_ _111\"> </span><span class=\"ff1f\">18,610<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:550.7173px;\">Purchase consider<span class=\"_ _1\"/>ation<span class=\"_ _43\"> </span><span class=\"fc1\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:536.6578px;\">Shares issued, a<span class=\"_ _1\"/>t fair value<span class=\"_ _1a6\"> </span><span class=\"ff1f\">19,265<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:519.64404px;\">Other reserv<span class=\"_ _1\"/>es (shar<span class=\"_ _1\"/>e replac<span class=\"_ _1\"/>ement awar<span class=\"_ _1\"/>ds)<span class=\"_ _2a\"> </span><span class=\"ff1f\">18<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:505.58453px;\">Pro<span class=\"_ _1\"/>visional locked bo<span class=\"_ _1\"/>x pa<span class=\"_ _1\"/>yment receiv<span class=\"_ _1\"/><span class=\"_ _2e9\">ed1</span><span class=\"_ _18c\"> </span><span class=\"ff1f\">(683)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:491.51526px;\">Adjustments t<span class=\"_ _1\"/>o locked bo<span class=\"_ _1\"/>x payment<span class=\"_ _68\"> </span><span class=\"ff1f\">10<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:477.44604px;\">T<span class=\"_ _0\"/>otal purchase c<span class=\"_ _1\"/>onsideration<span class=\"_ _251\"> </span><span class=\"ff1f\">18,610<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:463.90262px;\">1. <span class=\"_ _29\"> </span>Represen<span class=\"_ _1\"/>ts the positive net cash \ufb02o<span class=\"_ _1\"/>w of $1,513 million generat<span class=\"_ _1\"/>ed by BHPP assets<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:452.98264px;\"><span class=\"_ _2e9\">from the effectiv</span><span class=\"_ _1\"/>e date of the busines<span class=\"_ _1\"/><span class=\"_ _2e9\">s combination offset b</span><span class=\"_ _1\"/>y the notional<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:442.06262px;\">dividend distribution of $830 million paid to BHP<span class=\"_ _2\"/>.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:395.2578px;\">Analysis of cash \ufb02o<span class=\"_ _1\"/>ws on acquisition<span class=\"_ _166\"> </span><span class=\"fc1\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:381.19833px;\">Cash acquired on ac<span class=\"_ _1\"/>quisition <span class=\"_ _145\"> </span><span class=\"ff1f\">399<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:364.18457px;\">Pro<span class=\"_ _1\"/>visional locked bo<span class=\"_ _1\"/>x pa<span class=\"_ _1\"/>yment receiv<span class=\"_ _1\"/>ed<span class=\"_ _5e\"> </span><span class=\"ff1f\">683<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:350.12506px;\">Net cash \ufb02ow on acquisition (included in the c<span class=\"_ _1\"/>onsolidated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:340.37506px;\">statement of cash \ufb02o<span class=\"_ _1\"/>ws as in<span class=\"_ _1\"/>vesting activities<span class=\"_ _1\"/>)<span class=\"_ _126\"> </span><span class=\"ff1f\">1,082<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:311.0615px;\">Acquisition-related costs of $419 million that were not directly<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:295.4654px;\">attributable to the issue of shares are included as an expense<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:279.8693px;\">in general, administration and other costs in the consolidated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:264.2732px;\">income statement. $357 million has been paid and included in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:248.6771px;\">the consolidated statement of cash \ufb02ows as operating activities.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:233.081px;\">Acquisition-related costs of $5 million directly attributable to the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:217.4849px;\">issue of shares are included in contributed equity and included in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:201.8888px;\">the consolidated statement of cash \ufb02ows as \ufb01nancing activities.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:173.90643px;\">Shares issued, at fair value<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:158.30643px;\">The fair value of 914,768,948 shares issued as part of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:142.71033px;\">consideration paid to BHP was $19,265 million. This was based<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:127.11423px;\">on the published share price on 1 June 2022 of US$21.06  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:111.51813px;\">per share.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">B. Pr<span class=\"_ _1\"/>oduction and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"left:651.3286px; bottom:1.4145012px;\">129<span class=\"_ _49\"/><span class=\"ff1e fc5\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">B.5    Business c<span class=\"_ _1\"/>omination (<span class=\"_ _1\"/>cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">Provisional locked box payment received<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:883.93445px;\">The Group received $683 million as part of the merger<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:868.3384px;\">consideration which includes the locked box payment of  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:852.74225px;\">$1,513 million representing the positive net cash \ufb02ow generated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:837.1462px;\"><span class=\"_ _2e9\">by BHPP assets from the effective date of the transaction to<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:821.55005px;\"><span class=\"_ _2e9\">completion date offset by the notional dividend distribution </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:805.954px;\">of $830 million paid to BHP.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:782.9869px;\">The $683 million of provisional locked box payment received<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:767.39075px;\">and the $399 million of cash and cash equivalents acquired as<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:751.7947px;\">part of the merger have been included within investing activities<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:736.19855px;\">in the consolidated statement of cash \ufb02ows.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:708.20917px;\">Revenue and contribution to the Group<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:692.60913px;\">The acquired business contributed operating revenue of  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:677.01306px;\">$4,653 million and pro\ufb01t before tax of $2,042 million to the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:661.41693px;\">Group from the acquisition date to 31 December 2022. If the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:645.82086px;\">acquisition had occurred on 1 January 2022, consolidated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:630.22473px;\">operating revenue and pro\ufb01t before tax would have been higher<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:614.62866px;\">by $3,115 million and $1,265 million respectively.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:586.6541px;\">Acquired receivables<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:571.0541px;\">The fair value of receivables approximates the gross amount of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:555.458px;\">trade receivables. None of the receivables have been impaired<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:539.8619px;\">and the full contractual amounts are expected to be collected.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:511.89886px;\">Other liabilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:496.2989px;\">The Group recognised contingent liabilities of $79 million within<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:480.70282px;\">other liabilities. This is based on the Group\u2019s assessment of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:465.1067px;\">fair value of contingent liabilities acquired on acquisition, taking<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:449.5106px;\">into account a range of possible outcomes.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:426.5435px;\">As at 31 December 2022, there have been no changes to the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:410.9474px;\">amount recognised on acquisition date.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:382.97372px;\">Goodwill<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:367.37372px;\">Goodwill arising from the acquisition has been recognised as<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:351.77762px;\">the excess of consideration paid above the fair value of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:336.18152px;\">assets acquired and liabilities assumed as part of the business<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:320.58542px;\">combination. $1,958 million of the goodwill arises from the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:304.98932px;\">deferred tax liability recognised on acquisition as a consequence<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:289.39322px;\">of asset tax bases received in the merger being lower than<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:273.79712px;\">the fair value of the assets acquired. The remaining goodwill<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:258.20102px;\">of $2,656 million re\ufb02ects the value expected to be generated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:242.60492px;\">from the Pluto-Scarborough CGU as a result of the merger. The<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:227.00882px;\">goodwill is not deductible for tax purposes.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:204.04173px;\">Goodwill is initially measured at cost and is subsequently<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:188.44563px;\">measured at cost less any accumulated impairment losses.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:172.84953px;\">For the purposes of impairment testing, goodwill acquired in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:157.25343px;\">a business combination is, from the acquisition date, allocated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:141.65733px;\">to each of the Group\u2019s CGUs or groups of CGUs no larger than<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:126.06123px;\">an operating segment that are expected to bene\ufb01t from the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:110.46513px;\">combination, irrespective of whether other assets or liabilities  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:94.86903px;\">of the acquiree are assigned to those units.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:71.90193px;\">Where goodwill has been allocated to a CGU and part of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:56.305832px;\">operation within that unit is disposed of, the goodwill associated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:40.709732px;\">with the disposed operation is included in the carrying amount<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:25.113628px;\">of the operation when determining the gain or loss on disposal.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:900.9171px;\">Goodwill is not amortised but will be assessed at least annually<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:885.32104px;\">for impairment and more frequently if events or changes in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:869.7249px;\">circumstances indicate that it might be impaired.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:841.67926px;\">Share replacement awards<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:826.0792px;\">In accordance with the terms of the SSA, the Group exchanged<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:810.48315px;\">equity-settled share-based payment awards held by employees<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:794.887px;\">of BHPP for equity-settled share-based payment awards of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:779.29095px;\">Woodside. The replacement awards are based on service<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:763.6948px;\">conditions with a vesting date of 31 August 2023 and 31 August<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:748.09875px;\">2024. The fair value of the replacement awards on acquisition<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:732.5026px;\">is $49 million based on a forfeiture rate of 3%. $18 million<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:716.90656px;\">has been included as part of the purchase consideration and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:701.3104px;\">the remaining amount will be recognised as post-acquisition<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:685.71436px;\">compensation cost.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:657.72406px;\">Business combination accounting<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:642.124px;\">The acquisition method of accounting is used to account for<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:626.52795px;\">all business combinations, including business combinations<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:610.9318px;\">involving entities or businesses under common control,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:595.33575px;\">regardless of whether equity instruments are issued or liabilities<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:579.7396px;\">incurred or assumed at the date of exchange. Where equity<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:564.14355px;\">instruments are issued in an acquisition, the fair value of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:548.5474px;\">instruments is their published market price as at the date of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:532.95135px;\">exchange.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:509.98425px;\">Transaction costs arising on the issue of equity instruments<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:494.38812px;\">are recognised directly in equity. Transaction costs that were<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:478.79205px;\">not directly attributable to the issue of shares are expensed as<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:463.19595px;\">incurred.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:440.22885px;\">Contractual assets and liabilities in respect of sales agreements<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:424.63275px;\">are recognised at fair value.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls26 ws0\" style=\"left:342.73032px; bottom:401.66565px;\">Restoration provisions are recognised on acquisition at fair value.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:356.82153px; bottom:357.57367px;\">K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:356.82153px; bottom:336.9887px;\">(a) <span class=\"_ _0\"/>Fair value determination for net assets acquired<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:323.9887px;\">Judgement is required to determine the fair value of assets<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:310.9887px;\">acquired and liabilities assumed in a business combination, which<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:297.9887px;\">can have a material impact on resultant goodwill. This includes<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:284.9887px;\">the use of a cash \ufb02ow model to estimate the expected future<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:271.9887px;\">cash \ufb02ows of the oil and gas assets acquired, based on reserves<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:258.9887px;\">and resources at acquisition date and the discount rate used.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:245.98871px;\">The expected future cash \ufb02ows are based on estimates of future<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:232.98871px;\">production, commodity and carbon prices, operating costs, and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:219.98871px;\">forecast capital expenditures at acquisition da<span class=\"ws20\">te.<span class=\"_ _2e9\"> </span></span><span class=\"ws20\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:199.6151px;\">Restoration provisions require judgemental assumptions regarding<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:186.6151px;\">removal date, environmental legislation and regulations and the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:173.6151px;\">extent of restoration activities required in determining the cost<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:356.82153px; bottom:160.6151px;\">estimate.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:140.2415px;\">Carry forward tax losses are recognised only if it is probable that<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a wsa1\" style=\"left:356.82153px; bottom:127.2415px;\"><span class=\"_ _2e9\">sufficient future taxable income will be available to utilise the losses.<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:356.82153px; bottom:102.978424px;\">(b) <span class=\"_ _13b\"/>Goodwill allocation<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:89.97843px;\">Judgement is required in the allocation of goodwill to the Group\u2019s<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:76.97843px;\">CGUs that are expected to bene\ufb01t from the synergies of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:63.97843px;\">business combination. Refer to Note B.4 for the details of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:50.97843px;\">goodwill allocation.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">B. Pr<span class=\"_ _1\"/>oduction and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">130<span class=\"_ _1a\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">B.6 <span class=\"_ _fd\"> </span>Signi\ufb01cant production and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth asset acquisitions<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">(a) Sangomar \u2013 Acquisition from FAR Senegal<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:882.6409px;\">RSSD SA<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:867.0344px;\">On 7 July 2021, Woodside completed the acquisition of FAR<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:851.43835px;\">Senegal RSSD SA\u2019s interest in the RSSD Joint Venture (13.67%<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:835.8422px;\">interest in the Sangomar exploitation area and 15% interest in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:820.24615px;\">the remaining RSSD evaluation area), for an aggregate purchase<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:804.65px;\">price of $212 million. The transaction was accounted for as an<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:789.05396px;\">asset acquisition.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:766.08685px;\">Additional payments of up to $55 million are contingent on<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:750.4907px;\">future commodity prices and timing of \ufb01rst oil. The contingent<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:734.89465px;\">payments terminate on the earliest of 31 December 2027, three<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:719.2985px;\">years from \ufb01rst oil being sold, and a total contingent payment<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:703.70245px;\">of $55 million being reached. The contingent payments are<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:688.1063px;\">accounted for as contingent liabilities in accordance with the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:672.51025px;\">Group\u2019s accounting policies.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:649.54315px;\">As at 31 December 2021, Woodside held an 82% interest in the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:633.947px;\">Sangomar exploitation area (2020: 68.33%) and a 90% interest<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:618.35095px;\">in the remaining RSSD evaluation area (2020: 75%).<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:590.33905px;\">Assets acquired and liabilities assumed<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:574.7391px;\">The identi\ufb01able assets and liabilities acquired as at the date of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:559.14294px;\">the acquisition inclusive of transaction costs are:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:290.12567px; bottom:529.05695px;\">US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:514.99744px;\">Oil and gas properties<span class=\"_ _13c\"> </span>205<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:500.92816px;\">Exploration and e<span class=\"_ _1\"/>valua<span class=\"_ _1\"/>tion<span class=\"_ _15b\"> </span>7<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:486.85895px;\">Cash acquired<span class=\"_ _22f\"> </span>3<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:472.7897px;\">Pay<span class=\"_ _1\"/>ables<span class=\"_ _24b\"> </span>(13)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:458.72043px;\">Net other assets and liabilities assumed<span class=\"_ _aa\"> </span>10<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:441.7067px;\">T<span class=\"_ _0\"/>otal identi\ufb01able net assets at acquisition<span class=\"_ _18c\"> </span><span class=\"fc1\">212<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:408.07712px;\">Cash \ufb02ows on acquisition<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:290.12567px; bottom:385.36508px;\">US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:371.30557px;\">Purchase cash c<span class=\"_ _1\"/>onsideration<span class=\"_ _d3\"> </span>212<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:357.23633px;\">T<span class=\"_ _0\"/>ransaction costs<span class=\"_ _26a\"> </span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:343.16708px;\">T<span class=\"_ _0\"/>otal purchase c<span class=\"_ _1\"/>onsideration<span class=\"_ _24e\"> </span>212<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:326.15332px;\">Net cash out\ufb02ow<span class=\"_ _1\"/>s on acquisition<span class=\"_ _f1\"> </span><span class=\"fc1\">212<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:14.028687px; bottom:262.52716px;\">K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc5 ff1f fs56 fce sc0 ls0 ws0\" style=\"left:14.028687px; bottom:241.94205px;\">Nature of ac<span class=\"_ _1\"/>quisition<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:228.94205px;\">Judgement was required to determine if the transaction was the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:215.94206px;\">acquisition of an asset or a business combination. The Sangomar<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:202.94206px;\">project was in the early phase of development and a substantive<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:189.94206px;\">process that had the ability to convert inputs to outputs was not<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:14.028687px; bottom:176.94206px;\">present and therefore the acquisition in 2021 was treated as asset<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:14.028687px; bottom:163.94206px;\">acquisitions.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:899.5344px;\">(b) Sangomar \u2013 Acquisition from Capricorn<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:882.6409px;\">Senegal Limited<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:867.0344px;\">On 22 December 2020, Woodside completed the acquisition of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:851.43835px;\">Capricorn Senegal Limited\u2019s (Cairn\u2019s) interest in the RSSD Joint<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:835.8422px;\">Venture (36.44% interest in the Sangomar exploitation area<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:820.24615px;\">and 40% interest in the remaining RSSD evaluation area) for an<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:804.65px;\">aggregate purchase price of $527 million. The transaction was<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:789.05396px;\">accounted for as an asset acquisition.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:766.08685px;\">Additional payments of up to $100 million are contingent on<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:750.4907px;\">future commodity prices and the occurrence of \ufb01rst oil prior to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:734.89465px;\">2025. The contingent payments are accounted for as contingent<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:719.2985px;\">liabilities in accordance with the Group\u2019s accounting policies.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:691.30914px;\">Assets acquired and liabilities assumed<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:675.70917px;\">The identi\ufb01able assets and liabilities acquired as at the date of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:660.11304px;\">the acquisition inclusive of transaction costs were:<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:632.5333px; bottom:630.02704px;\">US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:615.95776px;\">Oil and gas properties<span class=\"_ _284\"> </span>540<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:601.88855px;\">Exploration and e<span class=\"_ _1\"/>valua<span class=\"_ _1\"/>tion<span class=\"_ _d1\"> </span><span class=\"ls6c ws85\">26<span class=\"_ _2e9\"> </span></span><span class=\"ls6c ws85\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:587.8193px;\">Cash acquired<span class=\"_ _22f\"> </span>5<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:573.75px;\">Pay<span class=\"_ _1\"/>ables<span class=\"_ _24b\"> </span>(51)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:559.69055px;\">Net other assets and liabilities assumed<span class=\"_ _64\"> </span>7<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:542.67676px;\">T<span class=\"_ _0\"/>otal identi\ufb01able net assets at acquisition<span class=\"_ _88\"> </span><span class=\"fc1 ls6 wsa\">527<span class=\"_ _2e9\"> </span></span><span class=\"fc1 ls6 wsa\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:509.04718px;\">Cash \ufb02ows on acquisition<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:632.5333px; bottom:486.33514px;\">US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:472.27567px;\">Purchase cash c<span class=\"_ _1\"/>onsideration<span class=\"_ _285\"> </span>525<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:458.20642px;\">T<span class=\"_ _0\"/>ransaction costs<span class=\"_ _286\"> </span>2<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:444.13718px;\">T<span class=\"_ _0\"/>otal purchase c<span class=\"_ _1\"/>onsideration<span class=\"_ _275\"> </span><span class=\"ls47 ws82\">527<span class=\"_ _2e9\"> </span></span><span class=\"ls47 ws82\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:427.1234px;\">Net cash out\ufb02ow<span class=\"_ _1\"/>s on acquisition<span class=\"_ _14d\"> </span><span class=\"fc1 ls6 wsa\">527</span><span class=\"fc1 ls6 wsa\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">B. Pr<span class=\"_ _1\"/>oduction and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"left:653.27094px; bottom:1.4145012px;\">131<span class=\"_ _49\"/><span class=\"ff1e fc5\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:928.91565px;\">B.7 <span class=\"_ _1d\"> </span>Disposal of assets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:900.9606px;\">Sell-down of Train 2<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:885.36053px;\">On 15 November 2021 the Group entered into a sale and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:869.76447px;\">purchase agreement with Global Infrastructure Partners (GIP)<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:854.16833px;\">for the sale of a 49% non-operating participating interest in the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:838.57227px;\">Pluto Train 2 Joint Venture.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:815.60516px;\">As at 31 December 2021, the Group reclassi\ufb01ed the carrying<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:800.00903px;\">value of the 49% interest in the Pluto Train 2 assets to assets<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:784.41296px;\">held for sale. There were no recognised liabilities associated  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:768.81683px;\">with the assets held for sale.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:745.84973px;\">The transaction completed on 18 January 2022, reducing the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:730.25366px;\">Group\u2019s participating interest from 100% to 51%. The Group<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:714.65753px;\">recognised an initial pre-tax gain on sale of $427 million.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:691.6904px;\">The arrangements require GIP to fund its 49% share of capital<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:676.09436px;\">expenditure from 1 October 2021 and an additional amount of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:660.4982px;\">construction capital expenditure of $822 million on behalf of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:644.90216px;\">the Group. If the total capital expenditure incurred is less than<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:629.306px;\">$5,800 million, GIP will pay Woodside an additional amount<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:613.70996px;\">equal to 49% of the under-spend. In the event of a cost overrun,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:598.11383px;\">Woodside will fund up to $822 million of GIP\u2019s share of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws2c\" style=\"bottom:582.51776px;\">overrun. Delays to the expected start-up of production will result<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:566.92163px;\">in payments by Woodside to GIP in certain circumstances. The<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:551.32556px;\">arrangements include provisions for GIP to be compensated for<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:535.72943px;\">exposure to additional Scope 1 emissions liabilities above agreed<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:520.13336px;\">baselines, and to sell its 49% interest back to Woodside if the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:504.53723px;\">status of key regulatory approvals materially changes.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:481.57013px;\">Given judgement was used to determine the consideration<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:465.97406px;\">received, the Group is required to remeasure the variable<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:450.37796px;\">consideration at each reporting period. As at 31 December<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:434.78186px;\">2022, the variable consideration has been remeasured with a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:419.18576px;\">$71 million revaluation gain recognised as other income, with a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:403.58966px;\">corresponding reduction to other liabilities. The fair value of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:387.99356px;\">remaining unpaid funding from GIP has been netted against the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:372.39746px;\">other liabilities and will be recognised as oil and gas properties in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:356.80136px;\">the future.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:356.82153px; bottom:888.0405px;\">K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc5 ff1f fs56 fce sc0 ls0 ws0\" style=\"left:356.82153px; bottom:867.4555px;\">Sell-down of T<span class=\"_ _0\"/>rain 2<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:854.4555px;\">Given the arrangements include provisions for GIP to sell its<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:841.4555px;\">49% interest back to Woodside if the status of key regulatory<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:828.4555px;\">environmental approvals materially changes and the requirement<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:815.4555px;\">for Woodside to fund up to $822 million of GIP\u2019s share in the event<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:802.4555px;\">of a cost overrun, judgement is required to determine if the sell-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:789.4555px;\">down of Train 2 constitutes a sale and if a portion of the transaction<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:776.4555px;\">price should be considered a variable consideration.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:756.0819px;\">Judgement was used to determine that the sell-down of <span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:743.0819px;\">Train 2 constituted a sale given the various conditions included in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:730.0819px;\">the sale and purchase agreement. The Group determined that a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:717.0819px;\">sale occurred as control of the 49% interest was passed to GIP on<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:704.0819px;\">completion date. Control is determined as the ability to direct the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:691.0819px;\">use of, and obtain substantially all of the economic bene\ufb01ts of, the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:678.0819px;\">associated interest.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:657.7083px;\">Judgement was used to determine if it is highly probable that a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:644.7083px;\">signi\ufb01cant reversal will not occur in relation to the consideration<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:631.7083px;\">received. The Group estimated the variable consideration based on<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:618.7083px;\">the construction capital expenditure cost pro\ufb01le, the development<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:605.7083px;\">schedule, and assessing the probability and impact of any event<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:592.7083px;\">which may result in a signi\ufb01cant reversal. The constraining<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:579.7083px;\">estimates of variable consideration have been applied resulting <span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:566.7083px;\">in the initial pre-tax gain on sale of $427 million.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:546.3347px;\">The variable consideration is remeasured at each reporting period<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:533.3347px;\">with any changes recognised through the consolidated income<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:520.3347px;\">statement. As at 31 December 2022, the variable consideration has<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:507.33472px;\">been remeasured with a $71 million revaluation gain recognised as<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:494.33472px;\">other income.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">B. Pr<span class=\"_ _1\"/>oduction and gr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>wth assets<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls31 ws35\" style=\"bottom:1.4145012px;\">132<span class=\"_ _24\"> </span><span class=\"ff21 fc5 ls0 ws0\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">C. Debt and capital<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h24 ff1d fs2 fc0 sc0 ls0 ws0\" style=\"bottom:927.4895px;\">In this section<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:904.5194px;\">This section addresses cash, debt and the capital position of the Group at the end of the reporting period including, where applicable,  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:888.92334px;\">the accounting policies applied and the key estimates and judgements made.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h3 ff1f fs1 fce sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:861.2818px;\">C. <span class=\"_ _1a\"> </span>Debt and capital<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:842.8565px;\">C.1 <span class=\"_ _56\"> </span>Cash and cash equivalents<span class=\"_ _aa\"> </span>Page 133<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:824.429px;\">C.2 <span class=\"_ _16\"> </span>Interest-bearing liabilities and \ufb01nancing facilities<span class=\"_ _b4\"> </span>Page 133<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:806.0015px;\">C.3 <span class=\"_ _16\"> </span>Contributed equity<span class=\"_ _3f\"> </span>Page 135<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:787.57404px;\">C.4 <span class=\"_ _fe\"> </span>Other reserves<span class=\"_ _1a9\"> </span>Page 135<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h24 ff1d fs2 fc0 sc0 ls0 ws0\" style=\"bottom:750.41327px;\">K<span class=\"_ _1\"/>ey \ufb01nancial and capital risks in this section<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:722.45807px;\">Capital risk management<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws31\" style=\"bottom:706.8581px;\">Group Treasury is responsible for the Group's capital management including cash, debt and equity. Capital management is undertaken<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:691.26196px;\"><span class=\"_ _2e9\">to ensure that a secure, cost-effective and \ufb02exible supply of funds is available to meet the Group\u2019s operating and capital expenditure<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:675.6659px;\">requirements. A stable capital base is maintained from which the Group can pursue its growth aspirations, whilst maintaining a \ufb02exible<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:660.06976px;\">capital structure that allows access to a range of debt and equity markets to both draw upon and repay capital.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:637.10266px;\">The Dividend Reinvestment Plan (DRP) was approved by shareholders at the Annual General Meeting in 2003 for activation  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:621.5066px;\">as required to fund future growth. The DRP was reactivated in 2019 and suspended by the Board of Directors on 27 February 2023.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:598.5395px;\">A range of \ufb01nancial metrics are monitored, including gearing and cash \ufb02ow leverage, and Treasury policy breaches and exceptions.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:570.5628px;\">Liquidity risk management<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:554.9628px;\">Liquidity risk arises from the \ufb01nancial liabilities of the Group and the Group\u2019s subsequent ability to meet its obligations to repay<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:539.3667px;\"><span class=\"_ _2e9\">\ufb01nancial liabilities as and when they fall due. The liquidity position of the Group is managed to ensure sufficient liquid funds are<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:523.7706px;\"><span class=\"_ _2e9\">available to meet its \ufb01nancial commitments in a timely and cost-effective manner.<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:500.80353px;\">The Group\u2019s liquidity is continually reviewed, including cash \ufb02ow forecasts to determine the forecast liquidity position and maintain<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:485.2074px;\">appropriate liquidity levels. At 31 December 2022, the Group had a total of $10,239 million (2021: $6,125 million) of available undrawn<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:469.61133px;\">facilities and cash at its disposal. The maturity pro\ufb01le of interest-bearing liabilities is disclosed in Note C.2, trade and other payables<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:454.01523px;\">are disclosed in Note D.4 and lease liabilities are disclosed in Note D.7. Financing facilities available to the Group are disclosed in  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:438.41913px;\">Note C.2.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:410.43765px;\">Interest rate risk management<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:394.83765px;\">Interest rate risk is the risk that the Group\u2019s \ufb01nancial position will \ufb02uctuate due to changes in market interest rates.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:371.87057px;\">The Group\u2019s exposure to the risk of changes in market interest rates relates primarily to \ufb01nancial instruments with \ufb02oating interest<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:356.27448px;\">rates including long-term debt obligations, cash and short-term deposits. The Group manages its interest rate risk by maintaining an<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:340.67834px;\">appropriate mix of \ufb01xed and \ufb02oating rate debt. To manage the ratio of \ufb01xed rate debt to \ufb02oating rate debt, the Group may enter into<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:325.08224px;\">interest rate swaps. The Group holds cross-currency interest rate swaps to hedge the foreign exchange risk (refer to Section A) and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:309.48615px;\">interest rate risk of the CHF denominated medium term note. The Group also holds interest rate swaps to hedge the interest rate risk<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:293.89005px;\">associated with the $600 million syndicated facility. Refer to Notes C.2 and D.6 for further details.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:270.92297px;\">At the reporting date, the Group was exposed to various benchmark interest rates that were not designated in cash \ufb02ow hedges,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:255.32687px;\">primarily through $6,143 million (2021: $2,962 million) on cash and cash equivalents, $83 million (2021: $367 million) on interest-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:239.73077px;\">bearing liabilities (excluding transaction costs), $167 million of other \ufb01nancial assets (2021: nil) and $5 million (2021: $9 million) on<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:224.13467px;\">cross-currency interest rate swaps.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:201.16756px;\"><span class=\"_ _2e9\">A reasonably possible change in the USD London Interbank Offered Rate (USD LIBOR) (+1.5%/-1.5% (2021: +1.0%/-1.0%)), with all<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:185.57146px;\">variables held constant, would not have a material impact on the Group\u2019s equity or the income statement in the current period.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:162.60435px;\">The transition of a number of the Group\u2019s \ufb01nancial liabilities from USD LIBOR to SOFR during the year ended 31 December 2022<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:147.00826px;\">did not result in a material impact to the Group. The Group\u2019s Treasury function continues to execute the transition of the remaining<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:131.41216px;\">\ufb01nancial instruments from current benchmark rates to alternative benchmark rates.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"left:651.3286px; bottom:1.4145012px;\">133<span class=\"_ _49\"/><span class=\"ff1e fc5\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">C.<span class=\"_ _1\"/>1 <span class=\"_ _91\"> </span>Cash and cash equivalents<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:234.72214px; bottom:903.816px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _188\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:230.95502px; bottom:888.84px;\">US$m<span class=\"_ _102\"> </span><span class=\"ff20\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:873.864px;\">Cash and cash equivalents<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:858.888px;\">Cash at bank<span class=\"_ _2c\"> </span><span class=\"ff1f\"> 1,222 <span class=\"_ _bb\"> </span></span> 300<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:843.912px;\">T<span class=\"_ _0\"/>erm deposits<span class=\"_ _7a\"> </span><span class=\"ff1f\"> 4,967 <span class=\"_ _d8\"> </span></span> 2,725<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:828.936px;\">Restricted cash<span class=\"_ _275\"> </span><span class=\"ff1f\"> 12 <span class=\"_ _9e\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:813.96px;\">T<span class=\"_ _0\"/>otal cash and cash equivalents<span class=\"_ _287\"> </span><span class=\"fc1\"> 6,201 <span class=\"_ _b6\"> </span><span class=\"ff20\"> 3,025<span class=\"_ _2e9\"> </span></span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:774.4674px;\">Recognition and measurement<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:758.86743px;\">Cash and cash equivalents in the consolidated statement of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:743.2713px;\">\ufb01nancial position comprise cash at bank and short-term deposits<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:727.67523px;\">with an original maturity of three months or less. Cash and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:712.0791px;\">cash equivalents are stated at face value in the consolidated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:696.48303px;\">statement of \ufb01nancial position. Cash and cash equivalents<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:680.8869px;\">include $12 million (2021: nil) restricted by legal or contractual<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:665.29083px;\">arrangements.  </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:911.116px;\">Foreign exchange risk<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:895.5095px;\">The following table summarises the Group's cash and cash<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:879.9134px;\">equivalents by currency.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:576.8685px; bottom:856.236px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _188\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:574.4908px; bottom:841.26px;\">US$m<span class=\"_ _102\"> </span><span class=\"ff20\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:826.284px;\">US dollar<span class=\"_ _111\"> </span><span class=\"ff1f\"> 5,886 <span class=\"_ _102\"> </span></span> 2,917<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:811.308px;\">Austr<span class=\"_ _1\"/>alian dollar<span class=\"_ _272\"> </span><span class=\"ff1f\"> 182 <span class=\"_ _b9\"> </span></span><span class=\"ls6b ws84\"> 63<span class=\"_ _2e9\"> </span></span><span class=\"ls6b ws84\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:796.332px;\">Other<span class=\"_ _17c\"> </span><span class=\"ff1f\"> 133 <span class=\"_ _b9\"> </span></span><span class=\"ls6c ws85\"> 45<span class=\"_ _2e9\"> </span></span><span class=\"ls6c ws85\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:781.356px;\">T<span class=\"_ _0\"/>otal cash and cash equivalents<span class=\"_ _287\"> </span><span class=\"fc1\"> 6,201 <span class=\"_ _b6\"> </span><span class=\"ff20\"> 3,025</span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:639.6973px;\">C.2 <span class=\"_ _1d\"> </span>Int<span class=\"_ _1\"/>eres<span class=\"_ _1\"/>t-bearing liabilities and \ufb01nancing facilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:261.77438px; bottom:616.9355px;\">Bilater<span class=\"_ _1\"/>al<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:259.87064px; bottom:607.1855px;\">Facilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:321.65106px; bottom:616.9355px;\">Syndicat<span class=\"_ _1\"/>ed<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:331.47894px; bottom:607.1855px;\">Facilities<span class=\"_ _e2\"> </span>JBIC Facility<span class=\"_ _b6\"> </span>US Bonds<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:527.3599px; bottom:616.9355px;\">Medium T<span class=\"_ _0\"/>erm<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:560.1541px; bottom:607.1855px;\">Notes<span class=\"_ _8c\"> </span>T<span class=\"_ _0\"/>otal<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:272.0713px; bottom:592.20953px;\">US$m<span class=\"_ _103\"> </span>US$m<span class=\"_ _163\"> </span>US$m<span class=\"_ _103\"> </span>US$m<span class=\"_ _103\"> </span>US$m<span class=\"_ _163\"> </span>US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:575.19574px;\">Y<span class=\"_ _0\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:560.2198px;\">At 1 January 2022<span class=\"_ _271\"> </span><span class=\"ff1f ls6e ws87\">(4)<span class=\"_ _13f\"> </span><span class=\"ls6a ws83\">595 <span class=\"_ _107\"> </span></span></span><span class=\"ff1f\">166 <span class=\"_ _103\"> </span>4,081 <span class=\"_ _13e\"> </span><span class=\"ls47 ws82\">5<span class=\"_ _4f\"/>92 <span class=\"_ _17a\"> </span></span>5,430<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:545.2438px;\"><span class=\"_ _2e9\">Repayments1</span><span class=\"_ _286\"> </span><span class=\"ff1f\">-<span class=\"_ _a6\"> </span>-<span class=\"_ _a9\"> </span>(83)<span class=\"_ _263\"> </span>-<span class=\"_ _b0\"> </span>(200)<span class=\"_ _160\"> </span>(283)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:530.26776px;\">Fair v<span class=\"_ _1\"/>alue adjustment and for<span class=\"_ _1\"/>eign ex<span class=\"_ _1\"/>change mo<span class=\"_ _1\"/>vement<span class=\"_ _6b\"> </span><span class=\"ff1f\">-<span class=\"_ _67\"> </span>-<span class=\"_ _a6\"> </span>-<span class=\"_ _67\"> </span>-<span class=\"_ _217\"> </span>(7)<span class=\"_ _10b\"> </span>(7<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\">)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:515.29175px;\">T<span class=\"_ _0\"/>ransaction costs capitalised and amortised<span class=\"_ _66\"> </span><span class=\"ff1f\">(1)<span class=\"_ _9f\"> </span><span class=\"ls6e ws87\">(4)<span class=\"_ _263\"> </span></span>-<span class=\"_ _13\"> </span>3 <span class=\"_ _63\"> </span>-<span class=\"_ _a\"> </span>(2<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\">)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:500.31573px;\">Carrying amount at 31 December 2022<span class=\"_ _18b\"> </span><span class=\"fc1\">(5)<span class=\"_ _249\"> </span>591 <span class=\"_ _9f\"> </span>83 <span class=\"_ _bc\"> </span>4,084 <span class=\"_ _a5\"> </span>385 <span class=\"_ _160\"> </span>5,<span class=\"_ _1\"/>138<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:485.33978px;\">Current<span class=\"_ _288\"> </span><span class=\"ff1f\">(2)<span class=\"_ _f0\"> </span>(3)<span class=\"_ _a9\"> </span>83 <span class=\"_ _a7\"> </span>(3)<span class=\"_ _249\"> </span>185 <span class=\"_ _13f\"> </span>260<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:470.36377px;\">Non-current<span class=\"_ _289\"> </span><span class=\"ff1f\">(3)<span class=\"_ _140\"> </span>594 <span class=\"_ _65\"> </span>-<span class=\"_ _210\"> </span>4,087 <span class=\"_ _ae\"> </span>200 <span class=\"_ _165\"> </span>4,878<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:455.38776px;\">Carrying amount at 31 December 2022<span class=\"_ _18b\"> </span><span class=\"fc1\">(5)<span class=\"_ _249\"> </span>591 <span class=\"_ _9f\"> </span>83 <span class=\"_ _bc\"> </span>4,084 <span class=\"_ _a5\"> </span>385 <span class=\"_ _160\"> </span>5,<span class=\"_ _1\"/>138<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:440.41177px;\">Undra<span class=\"_ _1\"/>wn balance at 31 December 20<span class=\"_ _1\"/>22<span class=\"_ _28a\"> </span><span class=\"fc1\">2,050 <span class=\"_ _169\"> </span>2,000 <span class=\"_ _65\"> </span>-<span class=\"_ _67\"> </span>-<span class=\"_ _a6\"> </span>-<span class=\"_ _103\"> </span>4,050<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:425.43576px;\">Y<span class=\"_ _0\"/>ear ended 31 December 2021<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:410.45975px;\">At 1 January 2021<span class=\"_ _17c\"> </span><span class=\"ls6e ws87\">(4<span class=\"_ _4f\"/>)<span class=\"_ _142\"> </span><span class=\"ls47 ws82\">593 <span class=\"_ _14a\"> </span></span></span>250 <span class=\"_ _163\"> </span>4,778 <span class=\"_ _249\"> </span><span class=\"ls4 ws8\">5<span class=\"_ _4f\"/>97 <span class=\"_ _143\"> </span></span>6,<span class=\"_ _4f\"/>214<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:395.48376px;\"><span class=\"_ _2e9\">Repayments1</span><span class=\"_ _28b\"> </span>-<span class=\"_ _263\"> </span>-<span class=\"_ _61\"> </span>(84)<span class=\"_ _160\"> </span>(7<span class=\"_ _1\"/>00)<span class=\"_ _263\"> </span>-<span class=\"_ _142\"> </span>(784<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:380.50775px;\">Fair v<span class=\"_ _1\"/>alue adjustment and for<span class=\"_ _1\"/>eign ex<span class=\"_ _1\"/>change mo<span class=\"_ _1\"/>vement<span class=\"_ _177\"> </span>-<span class=\"_ _263\"> </span>-<span class=\"_ _67\"> </span>-<span class=\"_ _67\"> </span>-<span class=\"_ _78\"> </span>(5)<span class=\"_ _10b\"> </span>(5<span class=\"_ _2e9\"> </span>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:365.53177px;\">Capitalised borro<span class=\"_ _1\"/>wing costs<span class=\"_ _285\"> </span>-<span class=\"_ _a\"> </span>2 <span class=\"_ _5f\"> </span>-<span class=\"_ _13\"> </span>3 <span class=\"_ _65\"> </span>-<span class=\"_ _13\"> </span>5<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:350.55576px;\">Carrying amount at 31 December 2021<span class=\"_ _28c\"> </span><span class=\"ls6e ws87\">(4)<span class=\"_ _13e\"> </span><span class=\"ls6a ws83\">595 <span class=\"_ _ab\"> </span></span></span>166 <span class=\"_ _160\"> </span>4,081 <span class=\"_ _249\"> </span><span class=\"ls75 ws8f\">592 <span class=\"_ _103\"> </span></span>5,430<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:335.57977px;\">Current<span class=\"_ _219\"> </span>(2)<span class=\"_ _a7\"> </span>(2)<span class=\"_ _61\"> </span>83 <span class=\"_ _f8\"> </span>(2)<span class=\"_ _140\"> </span>200 <span class=\"_ _174\"> </span>277<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:320.60376px;\">Non-current<span class=\"_ _153\"> </span>(2)<span class=\"_ _a5\"> </span><span class=\"ls4 ws8\">597<span class=\"_ _4f\"/> <span class=\"_ _f0\"> </span></span>83 <span class=\"_ _7\"> </span>4,083 <span class=\"_ _249\"> </span><span class=\"ls75 ws8f\">392 <span class=\"_ _bd\"> </span></span>5,<span class=\"_ _1\"/>153<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:305.62775px;\">Carrying amount at 31 December 2021<span class=\"_ _28c\"> </span><span class=\"ls6e ws87\">(4)<span class=\"_ _13e\"> </span><span class=\"ls6a ws83\">595 <span class=\"_ _ab\"> </span></span></span>166 <span class=\"_ _160\"> </span>4,081 <span class=\"_ _249\"> </span><span class=\"ls75 ws8f\">592 <span class=\"_ _103\"> </span></span>5,430<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:290.65176px;\">Undra<span class=\"_ _1\"/>wn balance at 31 December 20<span class=\"_ _1\"/>21<span class=\"_ _28d\"> </span>1,900 <span class=\"_ _a8\"> </span>1,200 <span class=\"_ _5f\"> </span>-<span class=\"_ _a6\"> </span>-<span class=\"_ _67\"> </span>-<span class=\"_ _b0\"> </span>3,100<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:275.67706px;\">1. <span class=\"_ _29\"> </span>Included in cash \ufb02ow<span class=\"_ _1\"/>s classi\ufb01ed within \ufb01nancing activities in the consolidated s<span class=\"_ _1\"/>tatement of cash \ufb02ow<span class=\"_ _1\"/>s.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:236.34946px;\">Recognition and measurement<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:220.74933px;\">All borrowings are initially recognised at fair value less<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:205.15323px;\">transaction costs. Borrowings are subsequently carried at<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:189.55713px;\"><span class=\"_ _2e9\">amortised cost. Any difference between the proceeds received<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:173.96103px;\">and the redemption amount is recognised in the income<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:158.36493px;\"><span class=\"_ _2e9\">statement over the period of the borrowings using the effective<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:142.76883px;\">interest method.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:119.80173px;\">Borrowings designated as a hedged item are measured at<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:104.20563px;\">amortised cost adjusted to record changes in the fair value of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:88.60953px;\">risks that are being hedged in fair value hedges. The changes in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:220.78442px;\">the fair value risks of the hedged item resulted in a gain of  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:205.18832px;\">$7 million being recorded (2021: gain of $5 million), and a loss  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:189.59222px;\">of $7 million recorded on the hedging instrument (2021: loss of  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:173.99612px;\">$7 million).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:151.02904px;\">All bonds, notes and facilities are subject to various covenants<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:135.43292px;\">and negative pledges restricting future secured borrowings,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:119.83682px;\">subject to a number of permitted lien exceptions. Neither the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:104.24072px;\">covenants nor the negative pledges have been breached at any<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:88.64463px;\">time during the reporting period.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">C. Debt and capital<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">134<span class=\"_ _1a\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">C.2 <span class=\"_ _1d\"> </span> <span class=\"_ _274\"/>Inter<span class=\"_ _1\"/>est-bearing liabilities and \ufb01nancing f<span class=\"_ _1\"/>acilities (<span class=\"_ _1\"/>cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">Fair value<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:883.93445px;\">The carrying amount of interest-bearing liabilities approximates<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:868.3384px;\">their fair value, with the exception of the Group\u2019s unsecured<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:852.74225px;\">bonds and the medium term notes. The unsecured bonds have<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:837.1462px;\">a carrying amount of $4,084 million (2021: $4,081 million) and a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:821.55005px;\">fair value of $3,852 million (2021: $4,443 million). The medium<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:805.954px;\">term notes have a carrying amount of $385 million (2021:  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:790.35785px;\">$592 million) and a fair value of $372 million (2021:  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:774.7618px;\">$604 million). Fair value is calculated based on the present value<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:759.16565px;\">of future principal and interest cash \ufb02ows, discounted at the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:743.5696px;\">market rate of interest at the reporting date and classi\ufb01ed as<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:727.97345px;\">Level 1 on the fair value hierarchy. Where these cash \ufb02ows are in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:712.3774px;\">a foreign currency, the present value is converted to US dollars<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:696.78125px;\">at the foreign exchange spot rate prevailing at the reporting<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:681.1851px;\">date. The Group\u2019s repayment obligations remain unchanged.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:653.17926px;\">Foreign exchange risk<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:637.5792px;\">All interest-bearing liabilities are denominated in US dollars,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:621.98315px;\">excluding the CHF175 million medium term note.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:594.0242px;\">Maturity pro\ufb01le of interest-bearing liabilities<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:578.4242px;\">The table below presents the contractual undiscounted<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:562.82806px;\">cash \ufb02ows associated with the Group\u2019s interest-bearing<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:547.232px;\">liabilities, representing principal and interest. The \ufb01gures will<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:531.63586px;\">not necessarily reconcile with the amounts disclosed in the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:516.0398px;\">consolidated statement of \ufb01nancial position.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:234.72214px; bottom:485.94208px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _188\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:230.95502px; bottom:471.88254px;\">US$m<span class=\"_ _102\"> </span><span class=\"ff20\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:454.8688px;\">Due for payment in:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:440.8093px;\">1 year or les<span class=\"_ _1\"/>s<span class=\"_ _39\"> </span><span class=\"ff1f\">483 <span class=\"_ _fa\"> </span></span><span class=\"ls6f ws88\">470<span class=\"_ _2e9\"> </span></span><span class=\"ls6f ws88\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:426.74005px;\">1-2 year<span class=\"_ _1\"/>s<span class=\"_ _ad\"> </span><span class=\"ff1f\">206 <span class=\"_ _da\"> </span></span>462<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:412.6708px;\">2-3 y<span class=\"_ _1\"/>ears<span class=\"_ _16f\"> </span><span class=\"ff1f\">1,181 <span class=\"_ _17f\"> </span></span>188<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:398.60156px;\">3-4 years<span class=\"_ _1a9\"> </span><span class=\"ff1f\">962 <span class=\"_ _95\"> </span></span>1,<span class=\"_ _1\"/>169<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:384.54205px;\">4-5 years<span class=\"_ _15b\"> </span><span class=\"ff1f\">908 <span class=\"_ _b9\"> </span></span><span class=\"ls6a ws83\">951<span class=\"_ _2e9\"> </span></span><span class=\"ls6a ws83\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:370.4728px;\">More than 5 y<span class=\"_ _1\"/>ears<span class=\"_ _28e\"> </span><span class=\"ff1f\">2,416 <span class=\"_ _c0\"> </span></span>3,320<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:234.72214px; bottom:356.40356px;\">6,<span class=\"_ _1\"/>156 <span class=\"_ _d8\"> </span><span class=\"ff20\">6,560<span class=\"_ _2e9\"> </span></span><span class=\"ff20\"> </span></div><div class=\"t m0 h23 ff23 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:342.8695px;\">Amounts e<span class=\"_ _1\"/>xclude tr<span class=\"_ _1\"/>ansaction costs.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:309.38684px;\">Bilateral facilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:293.78683px;\">The Group has 14 bilateral loan facilities totalling $2,050 million<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:278.19073px;\">(2021: 14 bilateral loan facilities totalling $1,900 million). Details  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:262.59464px;\">of bilateral loan facilities at the reporting date are as follows:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:16.605682px; bottom:233.24182px;\">Number of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:22.36351px; bottom:223.49182px;\">facilities<span class=\"_ _b7\"> </span>T<span class=\"_ _0\"/>erm (years<span class=\"_ _1\"/>)<span class=\"_ _f4\"> </span>Currency<span class=\"_ _d9\"> </span>Extension option<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:37.69818px; bottom:207.58955px;\">1<span class=\"_ _80\"> </span>5 - 6<span class=\"_ _106\"> </span>US$<span class=\"_ _b0\"> </span>Ever<span class=\"_ _1\"/>gr<span class=\"_ _1\"/>een<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:37.69818px; bottom:193.52031px;\">5<span class=\"_ _a6\"> </span>4 - 5<span class=\"_ _106\"> </span>US$<span class=\"_ _b0\"> </span>Ev<span class=\"_ _1\"/>ergr<span class=\"_ _1\"/>een<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:37.69818px; bottom:179.45107px;\">4<span class=\"_ _a6\"> </span>3 - 4<span class=\"_ _a1\"> </span>US$<span class=\"_ _b0\"> </span>Ever<span class=\"_ _1\"/>green<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:37.69818px; bottom:165.3818px;\">4<span class=\"_ _160\"> </span>3 years or les<span class=\"_ _1\"/>s<span class=\"_ _b9\"> </span>US$<span class=\"_ _b0\"> </span>Ever<span class=\"_ _1\"/>green<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:136.73137px;\">Interest rates are based on USD LIBOR or Secured Overnight<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:121.13527px;\">Financing Rate (SOFR) and margins are \ufb01xed at the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:105.53917px;\">commencement of the drawdown period. Interest is paid at<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:89.94307px;\">the end of the drawdown period. Evergreen facilities may be<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:74.34697px;\">extended continually by a year subject to the bank\u2019s agreement.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:899.5344px;\">Syndicated facility<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:883.93445px;\">During the period, Woodside re\ufb01nanced and increased the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:868.3384px;\">existing facilities to $2,000 million, with $800 million expiring<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:852.74225px;\">on 11 October 2024, $600 million expiring on 12 July 2025 and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:837.1462px;\">$600 million expiring on 12 July 2027. Interest rates are based<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:821.55005px;\">on SOFR and margins are \ufb01xed at the commencement of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:805.954px;\">drawdown period.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:782.9869px;\">On 17 January 2020, the Group completed a $600 million<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:767.39075px;\">syndicated facility with a term of seven years. Interest is based<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:751.7947px;\">on the USD LIBOR plus 1.2%. Interest is paid on a quarterly basis.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:723.80914px;\">Japan Bank for International Cooperation (JBIC)<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:706.91565px;\">facility<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:691.30914px;\">On 24 June 2008, the Group entered into a two tranche<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:675.7131px;\">committed loan facility of $1,000 million and $500 million<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:660.11694px;\">respectively. The $500 million tranche was repaid in 2013. There<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:644.5209px;\">is a prepayment option for the remaining balance. Interest rates<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:628.92474px;\">are based on USD LIBOR. Interest is payable semi-annually in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:613.3287px;\">arrears and the principal amortises on a straight-line basis, with<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws2c\" style=\"left:342.73032px; bottom:597.73254px;\">equal instalments of principal due on each interest payment date<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:582.1365px;\">(every six months).<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:559.1694px;\">Under this facility, 90% of the receivables from designated Pluto<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:543.57324px;\">LNG sale and purchase agreements are secured in favour of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:527.9772px;\">the lenders through a trust structure, with a required reserve<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:512.38104px;\">amount of $30 million.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:489.41394px;\">To the extent that this reserve amount remains fully funded<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:473.81787px;\">and no default notice or acceleration notice has been given, the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:458.22177px;\">revenue from Pluto LNG continues to \ufb02ow directly to the Group<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:442.62567px;\">from the trust account.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:414.61392px;\">Medium term notes<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:399.01392px;\">On 28 August 2015, the Group established a $3,000 million<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:383.41782px;\">Global Medium Term Notes Programme listed on the Singapore<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:367.82172px;\">Stock Exchange. Two notes have been issued under this<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:352.22562px;\">programme as set out below:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:312.38177px;\">Maturity date<span class=\"_ _79\"> </span><span class=\"fc1\">Currency<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:505.21808px; bottom:322.13177px;\">Carrying amount<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:540.25104px; bottom:312.38177px;\">(million)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:587.77484px; bottom:322.13177px;\">Nominal interes<span class=\"_ _1\"/>t<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls81 ws9d\" style=\"left:641.32495px; bottom:312.38177px;\">rate<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:297.63977px;\">11 December 2023<span class=\"_ _105\"> </span>CHF<span class=\"_ _13\"> </span>185<span class=\"_ _5d\"> </span>1.00%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:282.89777px;\">29 January 2027<span class=\"_ _13\"> </span>US$<span class=\"_ _78\"> </span>200<span class=\"_ _107\"> </span>3.07%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h23 ff23 fse fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:268.16125px;\">The unutilised progr<span class=\"_ _1\"/>am is not considered to be an unused f<span class=\"_ _1\"/>acility<span class=\"_ _1\"/>.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:234.67871px;\">US bonds<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:219.0787px;\">The Group has four unsecured bonds issued in the United States<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:203.4826px;\">of America as de\ufb01ned in Rule 144A of the <span class=\"ff23\">US Securities Act of<span class=\"_ _2e9\"> </span></span><span class=\"ff23\"> </span></div><div class=\"t m0 h6 ff23 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:187.8865px;\">1933<span class=\"ff20\"> as set out below:<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:147.39658px;\">Maturity date<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:505.21808px; bottom:157.14658px;\">Carrying amount<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:551.60236px; bottom:147.39658px;\">US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:587.77484px; bottom:157.14658px;\">Nominal interes<span class=\"_ _1\"/>t<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls81 ws9d\" style=\"left:641.32495px; bottom:147.39658px;\">rate<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:133.32732px;\">5 March 2025<span class=\"_ _9b\"> </span> 1,000 <span class=\"_ _13e\"> </span>3.65%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:119.26782px;\">15 September 2026<span class=\"_ _186\"> </span> 800 <span class=\"_ _13e\"> </span>3.70%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:105.19856px;\">15 March 2028<span class=\"_ _68\"> </span> 800 <span class=\"_ _13e\"> </span>3.70%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:91.12932px;\">4 March 2029<span class=\"_ _9b\"> </span> 1,500 <span class=\"_ _13f\"> </span>4.50%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:62.478622px;\">Interest on the bonds is payable semi-annually in arrears.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:39.51152px;\">During the period, the Group repaid $200 million of the Yucho<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:23.91542px;\">2022 Medium Term Note and $83 million on the JBIC facility. </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">C. Debt and capital<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div>135<span class=\"_ _49\"/><span class=\"ff1e fc5 ls0 ws0\">W<span class=\"_ _1\"/>oodside Energy Group L<span class=\"_ _1\"/>td      |<span class=\"_ _2e9\"> </span></span>C.3 <span class=\"_ _1d\"> </span>C<span class=\"_ _1\"/>ontributed equity<span class=\"_ _1\"/> Recognition and measurement<span class=\"_ _2e9\"> </span>Issued capital<span class=\"_ _2e9\"> </span>Ordinary shares are classi\ufb01ed as equity and recorded at the value of consideration received. The cost of issuing shares is shown in share capital as a deduction, net of tax, from the proceeds.<span class=\"_ _2e9\"> </span>Reserved shares<span class=\"_ _2e9\"> </span>Reserved shares are the Group\u2019s own equity instruments, which are reacquired for later use in employee share-based payment arrangements or the Dividend Reinvestment Plan (DRP). These shares are deducted from equity. No gain or loss is recognised in the income statement on the purchase, sale, issue or cancellation of the Group\u2019s own equity instruments.<span class=\"_ _2e9\"> </span>(a) Issued and fully paid shares<span class=\"_ _2e9\"> </span>Number of shares<span class=\"_ _249\"> </span>US$m<span class=\"_ _2e9\"> </span>Y<span class=\"_ _0\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span>Opening balance<span class=\"_ _66\"> </span><span class=\"ff1f\"> 969,631,826 <span class=\"_ _ac\"> </span> 9,409 </span>DRP \u2013 ordinary shar<span class=\"_ _1\"/>es issued at US$23.<span class=\"_ _1\"/><span class=\"_ _2e9\">14 (2021 \ufb01nal dividend)1</span><span class=\"_ _61\"> </span><span class=\"ff1f\"> 14,348,997 <span class=\"_ _f0\"> </span> 332 </span>Ordinary shar<span class=\"_ _1\"/>es issued at US$21.06 f<span class=\"_ _1\"/>or <span class=\"_ _2e9\">the acquisition of BHPP2</span><span class=\"_ _69\"> </span><span class=\"ff1f\"> 914,768,948 <span class=\"_ _163\"> </span> 19,265 </span>T<span class=\"_ _0\"/>ransaction costs associat<span class=\"_ _1\"/>ed to the issue of shares<span class=\"_ _20d\"> </span><span class=\"ff1f\"> - <span class=\"_ _65\"> </span> (5)<span class=\"_ _2e9\"> </span></span>Amounts as at 31 December 2022<span class=\"_ _b1\"> </span><span class=\"fc1\"> 1,898,7<span class=\"_ _0\"/>49,771 <span class=\"_ _7\"> </span> 29,001 </span>Y<span class=\"_ _0\"/>ear ended 31 December 2021<span class=\"_ _2e9\"> </span>Opening balance<span class=\"_ _6c\"> </span> 962,225,814 <span class=\"_ _13e\"> </span> 9,297 DRP \u2013 ordinary shar<span class=\"_ _1\"/>es issued at US$19.0<span class=\"_ _1\"/>3 (2020 \ufb01nal dividend) <span class=\"_ _78\"> </span> 1,354,0<span class=\"_ _1\"/>72 <span class=\"_ _263\"> </span><span class=\"ls6c ws85\"> 26 </span>DRP \u2013 ordinary shar<span class=\"_ _1\"/>es issued at US$14.21 (2021 interim dividend) <span class=\"_ _107\"> </span> 6,051,940 <span class=\"_ _5a\"> </span> 86 Amounts as at 31 December 2021<span class=\"_ _a8\"> </span>969,631,826 <span class=\"_ _a5\"> </span>9,409 Y<span class=\"_ _0\"/>ear ended 31 December 2020<span class=\"_ _2e9\"> </span>Opening balance<span class=\"_ _46\"> </span> 942,286,900 <span class=\"_ _a5\"> </span> 9,010 DRP \u2013 ordinary shar<span class=\"_ _1\"/>es issued at A$25.61 (2019 \ufb01nal dividend)<span class=\"_ _67\"> </span> 12,0<span class=\"_ _1\"/>72,034 <span class=\"_ _5a\"> </span> 181 DRP \u2013 ordinary shar<span class=\"_ _1\"/>es issued at A$18.79 (20<span class=\"_ _1\"/>20 interim dividend)<span class=\"_ _10d\"> </span> 6,091,035 <span class=\"_ _263\"> </span> 83 Employ<span class=\"_ _1\"/>ee shar<span class=\"_ _1\"/>e plan \u2013 ordinary shares issued a<span class=\"_ _1\"/>t A$18.27  (2017 W<span class=\"_ _1\"/>oodside equity plan)<span class=\"_ _171\"> </span> 1,775,845 <span class=\"_ _6b\"> </span> 23 Amounts as at 31 December 2020<span class=\"_ _169\"> </span> 962,225,814 <span class=\"_ _142\"> </span> 9,297 1. <span class=\"_ _29\"> </span>Relates t<span class=\"_ _1\"/>o ordinary shar<span class=\"_ _1\"/>es issued for the DRP as part of the 2021 \ufb01nal dividend. The Gr<span class=\"_ _1\"/>oup purchased on-mark<span class=\"_ _1\"/>et shares for the issuanc<span class=\"_ _1\"/>e of DRP as part of the 2022 interim dividend. Ref<span class=\"_ _1\"/>er to Note C.3(b<span class=\"_ _1\"/>) for details of the on-market purchases and allocation.  2.  914,768,948 ne<span class=\"_ _1\"/>w W<span class=\"_ _1\"/>oodside shares w<span class=\"_ _1\"/>ere issued as c<span class=\"_ _1\"/>onsideration for the BHPP merger<span class=\"_ _0\"/>. Refer to Note B.5 f<span class=\"_ _1\"/>or details. All shares are a single class with equal rights to dividends, capital, distributions and voting. The Company does not have authorised capital nor par value in relation to its issued shares.<span class=\"_ _2e9\"> </span>(b) Reserved shares<span class=\"_ _2e9\"> </span>Emplo<span class=\"_ _1\"/>yee<span class=\"_ _1\"/> share<span class=\"_ _1\"/> plans<span class=\"_ _2e9\"> </span>Dividend<span class=\"_ _1\"/> rein<span class=\"_ _1\"/>vestme<span class=\"_ _1\"/>nt plan<span class=\"_ _2e9\"> </span>Number of shares<span class=\"_ _41\"> </span>US$m<span class=\"_ _2e9\"> </span>Number of shares<span class=\"_ _1a\"> </span><span class=\"ls79 ws94\">US$</span>m<span class=\"_ _2e9\"> </span>Y<span class=\"_ _0\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span>Opening balance<span class=\"_ _ce\"> </span><span class=\"ff1f\">1,819,7<span class=\"_ _0\"/>44 <span class=\"_ _c5\"> </span>(30)<span class=\"_ _210\"> </span>-<span class=\"_ _e3\"> </span>-<span class=\"_ _2e9\"> </span></span>Purchases during the y<span class=\"_ _1\"/>ear<span class=\"_ _94\"> </span><span class=\"ff1f\">2,232,589 <span class=\"_ _c5\"> </span><span class=\"ls6e ws87\">(45<span class=\"_ _4f\"/>)<span class=\"_ _22\"> </span></span>6,823,092 <span class=\"_ _41\"> </span>(144)<span class=\"_ _2e9\"> </span></span>V<span class=\"_ _1\"/>est<span class=\"_ _1\"/>ed/<span class=\"_ _1\"/>allocated during the y<span class=\"_ _1\"/>ear<span class=\"_ _93\"> </span><span class=\"ff1f\">(2,178,556)<span class=\"_ _b3\"> </span><span class=\"ls70 ws89\">37 <span class=\"_ _56\"> </span></span>(6,823,09<span class=\"_ _1\"/>2)<span class=\"_ _182\"> </span>144 </span>Amounts at 31 December 2022<span class=\"_ _e5\"> </span><span class=\"fc1\">1,873,777 <span class=\"_ _c5\"> </span>(38)<span class=\"_ _a8\"> </span>-<span class=\"_ _e3\"> </span>-<span class=\"_ _2e9\"> </span></span>Y<span class=\"_ _0\"/>ear ended 31 December 2021<span class=\"_ _2e9\"> </span>Opening balance<span class=\"_ _175\"> </span>1,766,<span class=\"_ _1\"/>099 <span class=\"_ _c4\"> </span>(23)<span class=\"_ _160\"> </span>-<span class=\"_ _e3\"> </span>-<span class=\"_ _2e9\"> </span>Purchases during the y<span class=\"_ _1\"/>ear<span class=\"_ _da\"> </span>2,683,469 <span class=\"_ _c4\"> </span><span class=\"ls6f ws88\">(47<span class=\"_ _4f\"/>)<span class=\"_ _160\"> </span></span>-<span class=\"_ _e3\"> </span>-<span class=\"_ _2e9\"> </span>V<span class=\"_ _1\"/>est<span class=\"_ _1\"/>ed during the year<span class=\"_ _bd\"> </span>(2,629,82<span class=\"_ _1\"/>4)<span class=\"_ _181\"> </span>40 <span class=\"_ _ac\"> </span>-<span class=\"_ _e3\"> </span>-<span class=\"_ _2e9\"> </span>Amounts at 31 December 2021<span class=\"_ _f5\"> </span>1,819,7<span class=\"_ _0\"/>44 <span class=\"_ _d4\"> </span>(30)<span class=\"_ _a8\"> </span>-<span class=\"_ _e3\"> </span>-<span class=\"_ _2e9\"> </span>Y<span class=\"_ _0\"/>ear ended 31 December 2020<span class=\"_ _2e9\"> </span>Opening balance<span class=\"_ _172\"> </span>1,985,<span class=\"_ _4f\"/>306 <span class=\"_ _d4\"> </span>(39)<span class=\"_ _160\"> </span>-<span class=\"_ _e3\"> </span>-<span class=\"_ _2e9\"> </span>Purchases during the y<span class=\"_ _1\"/>ear<span class=\"_ _189\"> </span>2,242,345 <span class=\"_ _c4\"> </span>(32)<span class=\"_ _160\"> </span>-<span class=\"_ _e3\"> </span>-<span class=\"_ _2e9\"> </span>V<span class=\"_ _1\"/>est<span class=\"_ _1\"/>ed during the year<span class=\"_ _142\"> </span>(2,461,552)<span class=\"_ _d5\"> </span>48 <span class=\"_ _ac\"> </span>-<span class=\"_ _e3\"> </span>-<span class=\"_ _2e9\"> </span>Amounts at 31 December 2020<span class=\"_ _dc\"> </span>1,766,<span class=\"_ _1\"/>099 <span class=\"_ _c4\"> </span>(23)<span class=\"_ _a8\"> </span>-<span class=\"_ _d7\"> </span>-<span class=\"_ _2e9\"> </span>C.4 <span class=\"_ _fd\"> </span>Other r<span class=\"_ _1\"/>eserv<span class=\"_ _1\"/>es<span class=\"_ _2e9\"> </span>202<span class=\"_ _4f\"/>2<span class=\"_ _bb\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _c2\"> </span>2020<span class=\"_ _2e9\"> </span></span>US$m<span class=\"_ _d7\"> </span><span class=\"ff20\">US$m<span class=\"_ _b6\"> </span>US$m<span class=\"_ _2e9\"> </span></span>Other reserv<span class=\"_ _1\"/>es<span class=\"_ _2e9\"> </span>Employ<span class=\"_ _1\"/>ee bene\ufb01ts r<span class=\"_ _1\"/>eserve<span class=\"_ _69\"> </span><span class=\"ff1f ls6b ws84\">2<span class=\"_ _4f\"/>78 <span class=\"_ _95\"> </span></span>232 <span class=\"_ _da\"> </span>219 For<span class=\"_ _1\"/>eign currency tr<span class=\"_ _1\"/>anslation reserv<span class=\"_ _1\"/>e<span class=\"_ _dd\"> </span><span class=\"ff1f\">796 <span class=\"_ _95\"> </span></span><span class=\"ls26 ws2e\">793 <span class=\"_ _95\"> </span>793<span class=\"_ _4f\"/> </span>Hedging reserv<span class=\"_ _1\"/><span class=\"_ _2e9\">e1</span><span class=\"_ _10a\"> </span><span class=\"ff1f\">(586)<span class=\"_ _b1\"> </span></span>(400)<span class=\"_ _fa\"> </span>(71)<span class=\"_ _2e9\"> </span>Distributable pro\ufb01ts r<span class=\"_ _1\"/>eserv<span class=\"_ _1\"/><span class=\"_ _2e9\">e2</span><span class=\"_ _217\"> </span><span class=\"ff1f\">3,541 <span class=\"_ _17f\"> </span></span>58 <span class=\"_ _15f\"> </span>462 Other reserv<span class=\"_ _1\"/>es<span class=\"_ _197\"> </span><span class=\"ff1f\">2 <span class=\"_ _141\"> </span></span>-<span class=\"_ _ae\"> </span>-<span class=\"_ _2e9\"> </span>4,031 <span class=\"_ _15e\"> </span><span class=\"ff20\">683 <span class=\"_ _d8\"> </span>1,403 </span>1. <span class=\"_ _29\"> </span>The portion of the hedging r<span class=\"_ _1\"/>eserve r<span class=\"_ _1\"/>elating to settled hedges is $226 million.<span class=\"_ _2e9\"> </span>2.  For the year ended 31 December 20<span class=\"_ _1\"/>22, the Group tr<span class=\"_ _1\"/>ansferred $5,55<span class=\"_ _1\"/>3 million of retained earnings t<span class=\"_ _1\"/>o the distributable pro\ufb01ts r<span class=\"_ _1\"/>eserve<span class=\"_ _1\"/>. The increase w<span class=\"_ _1\"/><span class=\"_ _2e9\">as offset by </span>the 2022 interim dividend of $2,<span class=\"_ _1\"/>07<span class=\"_ _1\"/>0 million which was paid on 6 October 20<span class=\"_ _1\"/>22.<span class=\"_ _2e9\"> </span>Nature and purpose<span class=\"_ _2e9\"> </span>Employee bene\ufb01ts reserve<span class=\"_ _2e9\"> </span>Used to record share-based payments associated with the employee share plans.<span class=\"_ _2e9\"> </span>Foreign currency translation reserve<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">Used to record foreign exchange differences arising from the </span>translation of the \ufb01nancial statements of foreign entities from their functional currency to the Group\u2019s presentation currency.<span class=\"_ _2e9\"> </span>Hedging reserve<span class=\"_ _2e9\"> </span>Used to record gains and losses on hedges designated as cash \ufb02ow hedges, and foreign currency basis spread arising from the designation of a \ufb01nancial instrument as a hedging instrument. Gains and losses accumulated in the cash \ufb02ow hedge reserve for qualifying assets are capitalised against the carrying amount of that asset and taken to the income statement as the asset is depreciated. Distributable pro\ufb01ts reserve<span class=\"_ _2e9\"> </span>Used to record distributable pro\ufb01ts generated by the Parent entity, Woodside Energy Group Ltd. Other reserves<span class=\"_ _2e9\"> </span>Used to record gains and losses on \ufb01nancial instruments at fair value through other comprehensive income. Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">C. Debt and capital<span class=\"_ _2e9\"> </span></span>for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">136<span class=\"_ _24\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h24 ff1d fs2 fc0 sc0 ls0 ws0\" style=\"bottom:927.4895px;\">In this section<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:904.5194px;\">This section addresses the other assets and liabilities position at the end of the reporting period including, where applicable, the </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:888.92334px;\">accounting policies applied and the key estimates and judgements made. </div><div class=\"t m0 h3 ff1f fs1 fce sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:861.2817px;\">D. <span class=\"_ _1d\"> </span>Other assets and liabilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:842.8564px;\">D.1 <span class=\"_ _fd\"> </span>Segment assets and liabilities<span class=\"_ _35\"> </span>Page 137<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 wsa4\" style=\"left:1.8680992px; bottom:824.4289px;\">D.2 Receivables<span class=\"_ _28f\"> </span><span class=\"ws0\">Page 137<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 wsa5\" style=\"left:1.8680992px; bottom:806.3056px;\">D.3 Inventories<span class=\"_ _266\"> </span><span class=\"ws0\">Page 137<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 wsa6\" style=\"left:1.8680992px; bottom:787.8781px;\">D.4 Payables<span class=\"_ _23c\"> </span><span class=\"ws0\">Page 138<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 wsa7\" style=\"left:1.8680992px; bottom:769.4506px;\">D.5 Provisions<span class=\"_ _1e\"> </span><span class=\"ws0\">Page 138<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:751.0231px;\">D.6  Other \ufb01nancial assets and liabilities<span class=\"_ _12f\"> </span>Page 140<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 wsa8\" style=\"left:1.8680992px; bottom:732.5956px;\">D.7 Leases<span class=\"_ _264\"> </span><span class=\"ws0\">Page 143<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h24 ff1d fs2 fc0 sc0 ls0 ws0\" style=\"bottom:695.4371px;\">K<span class=\"_ _1\"/>ey \ufb01nancial and capital risks in this section<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:667.482px;\">Credit risk management<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:651.88196px;\">Credit risk is the risk that a counterparty will not meet its obligation under a \ufb01nancial instrument or customer contract, leading to a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:636.2859px;\">\ufb01nancial loss to the Group. Credit risk arises from the \ufb01nancial assets of the Group, which comprise trade and other receivables, loans<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:620.68976px;\">receivables and deposits with banks and \ufb01nancial institutions.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:597.72266px;\">The Group manages its credit risk on trade receivables and \ufb01nancial instruments by predominantly dealing with counterparties<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:582.1266px;\"><span class=\"_ _2e9\">with an investment grade credit rating. Sufficient collateral is obtained to mitigate the risk of \ufb01nancial loss when transacting with<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:566.53046px;\">counterparties with below investment grade credit ratings. Customers who wish to trade on unsecured credit terms are subject to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:550.9344px;\">credit veri\ufb01cation procedures. Receivable balances are monitored on an ongoing basis. As a result, the Group\u2019s exposure to bad debts<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:535.33826px;\">is not signi\ufb01cant. The Group\u2019s maximum credit risk is limited to the carrying amount of its \ufb01nancial assets.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:512.37115px;\">Customer credit risk is managed by the Treasury function subject to the Group\u2019s established policy, procedures and controls relating<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:496.7751px;\">to customer credit risk management. Credit quality of a customer is assessed based on an extensive credit rating scorecard and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:481.17896px;\">individual credit limits are de\ufb01ned in accordance with this assessment. Outstanding customer receivables are regularly monitored.  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:465.5829px;\">At 31 December 2022, the Group had nineteen customers (2021: four customers) that owed the Group more than $10 million each and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:449.9868px;\">accounted for approximately 79% (2021: 88%) of all trade receivables. Depending on the product, settlement terms are 8 to 30 days<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:434.3907px;\">from the date of invoice or bill of lading unless otherwise stated in the agreed payment terms.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:411.42358px;\">The Group considers the probability of default upon initial recognition of the asset and whether there has been a signi\ufb01cant<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:395.82748px;\">depreciation in credit quality on an ongoing basis. A signi\ufb01cant decrease in credit quality is de\ufb01ned as a debtor being greater than<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:380.23138px;\">30 days past due in making a contractual payment. Credit losses for trade receivables (including lease receivables) and contract<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:364.63528px;\">assets are determined by applying the simpli\ufb01ed approach and are measured at an amount equal to lifetime expected loss. Under the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:349.03918px;\">simpli\ufb01ed approach, determination of the loss allowance provision and expected loss rate incorporates past experience and forward-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:333.44308px;\">looking information, including the outlook for market demand and forward-looking interest rates. A default on other \ufb01nancial assets is<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:317.847px;\">considered to be when the counterparty fails to make contractual payments within 60 days of when they fall due.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:294.87988px;\">At 31 December 2022, the Group had a provision for credit losses of nil (2021: nil). Subsequent to 31 December 2022, 99% (2021: 100%)<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:279.28378px;\">of the trade receivables balance of $1,067 million (2021: $152 million) has been received.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:256.31668px;\">Credit risk from balances with banks is managed by the Treasury function in accordance with the Group\u2019s policy. The Group\u2019s<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:240.72058px;\">main funds are placed as short-term deposits with reputable \ufb01nancial institutions with strong investment grade credit ratings. At<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:225.12448px;\">31 December 2022 and 31 December 2021, there were no signi\ufb01cant concentrations of credit risk within the Group and \ufb01nancial<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:209.52838px;\">instruments are spread amongst a number of \ufb01nancial institutions to minimise the risk of counterparty default. The maximum<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:193.93228px;\">exposure to \ufb01nancial institution credit risk is represented by the sum of all cash deposits plus accrued interest, bank account balances<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:178.33618px;\">and fair value of derivative assets. The Group\u2019s counterparty credit policy limits this exposure to commercial and investment banks,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:162.74008px;\">according to approved credit limits based on the counterparty\u2019s credit rating.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">D<span class=\"_ _1\"/>. Other asse<span class=\"_ _1\"/>ts and liabilities<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls28 ws2f\" style=\"left:651.3286px; bottom:1.4145012px;\">137<span class=\"_ _49\"/><span class=\"ff1e fc5 ls0 ws0\">Woodside Ener<span class=\"_ _1\"/>gy Group Lt<span class=\"_ _1\"/>d      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">D<span class=\"_ _1\"/>.<span class=\"_ _0\"/>1 <span class=\"_ _92\"> </span>Segment assets and liabilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:234.72214px; bottom:897.40753px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _176\"> </span><span class=\"ff20 ls0 ws0\"><span class=\"_ _2e9\">20212<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:230.95502px; bottom:883.33826px;\">US$m<span class=\"_ _102\"> </span><span class=\"ff20\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:866.3245px;\">(a) Segment assets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hab ff22 fs54 fc0 sc0 ls0 ws0\" style=\"left:84.0372px; bottom:869.5773px;\">1<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:852.2659px;\">Austr<span class=\"_ _1\"/>alia<span class=\"_ _111\"> </span><span class=\"ff1f\">31,240 <span class=\"_ _c0\"> </span></span>18,163<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:838.19666px;\">International<span class=\"_ _24f\"> </span><span class=\"ff1f\">18,084 <span class=\"_ _c2\"> </span></span>2,877<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:824.12744px;\">Marketing<span class=\"_ _1a9\"> </span><span class=\"ff1f\">182 <span class=\"_ _b9\"> </span></span>217<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:810.05817px;\">Corpora<span class=\"_ _1\"/>te/<span class=\"_ _1\"/>Other <span class=\"_ _213\"> </span><span class=\"ff1f\">9,815 <span class=\"_ _b7\"> </span></span>5,217<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:229.9401px; bottom:795.98895px;\">59,321 <span class=\"_ _e1\"> </span><span class=\"ff20\">26,4<span class=\"_ _1\"/>7<span class=\"_ _0\"/>4<span class=\"_ _2e9\"> </span></span><span class=\"ff20\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:234.72214px; bottom:760.2362px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _176\"> </span><span class=\"ff20 ls0 ws0\"><span class=\"_ _2e9\">20212<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:230.95502px; bottom:746.16693px;\">US$m<span class=\"_ _102\"> </span><span class=\"ff20\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:729.1532px;\">(b) Segment liabilities</div><div class=\"t m0 hab ff22 fs54 fc0 sc0 ls0 ws0\" style=\"left:96.075195px; bottom:732.40594px;\">1<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:715.0947px;\">Austr<span class=\"_ _1\"/>alia<span class=\"_ _290\"> </span><span class=\"ff1f\">8,<span class=\"_ _1\"/>104 <span class=\"_ _bf\"> </span><span class=\"ff20\">2,889<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:701.0255px;\">International<span class=\"_ _15a\"> </span><span class=\"ff1f\">2,677 <span class=\"_ _fa\"> </span></span><span class=\"ls6a ws83\">435<span class=\"_ _2e9\"> </span></span><span class=\"ls6a ws83\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:686.95624px;\">Marketing<span class=\"_ _16f\"> </span><span class=\"ff1f\">561 <span class=\"_ _fa\"> </span></span><span class=\"ls6b ws84\">639<span class=\"_ _2e9\"> </span></span><span class=\"ls6b ws84\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:672.88696px;\">Corpora<span class=\"_ _1\"/>te/<span class=\"_ _1\"/>Other<span class=\"_ _291\"> </span><span class=\"ff1f\">10,852 <span class=\"_ _bf\"> </span></span>8,<span class=\"_ _4f\"/>282<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:229.9401px; bottom:658.81775px;\">22,<span class=\"_ _1\"/>194 <span class=\"_ _b6\"> </span><span class=\"ff20\">12,2<span class=\"_ _1\"/>45<span class=\"_ _2e9\"> </span></span><span class=\"ff20\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:645.2922px;\">1. <span class=\"_ _29\"> </span>Acquisitions thr<span class=\"_ _1\"/>ough business combination ha<span class=\"_ _1\"/>ve been r<span class=\"_ _1\"/>ecognised on a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:634.37213px;\">pro<span class=\"_ _1\"/>visional basis. Adjustments will be made t<span class=\"_ _1\"/>o the pro<span class=\"_ _1\"/>visional amounts if new<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:623.45215px;\">information is obtained within 12 months fr<span class=\"_ _1\"/>om the acquisition date. R<span class=\"_ _1\"/>efer to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:612.53217px;\">Note B.5 for details.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:598.99133px;\">2.  The 2021 amounts hav<span class=\"_ _1\"/>e been resta<span class=\"_ _1\"/>ted to r<span class=\"_ _1\"/>e\ufb02ect the changes in operating<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:588.07135px;\">segments. Refer to \u2018<span class=\"_ _1\"/>Operating segment inf<span class=\"_ _1\"/>ormation\u2019 in Note A.<span class=\"_ _1\"/>1 for details.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:559.57043px;\">Refer to Note A.1 for descriptions of the Group\u2019s segments.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:543.9743px;\">Corporate/other assets mainly comprise cash and cash<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:528.37823px;\">equivalents, deferred tax assets and lease assets. Corporate/<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:512.7821px;\">other liabilities mainly comprise interest-bearing liabilities,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:497.18604px;\">deferred tax liabilities and lease liabilities.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 wsa9\" style=\"bottom:464.23035px;\">D<span class=\"_ _1\"/>.2 Rec<span class=\"_ _1\"/>eivables<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:234.72214px; bottom:434.1481px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _188\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:230.95502px; bottom:420.0886px;\">US$m<span class=\"_ _102\"> </span><span class=\"ff20\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:403.07486px;\">(a) Receiv<span class=\"_ _1\"/>ables (curr<span class=\"_ _1\"/>ent)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:389.01535px;\">T<span class=\"_ _0\"/>rade receiv<span class=\"_ _1\"/><span class=\"_ _2e9\">ables1</span><span class=\"_ _291\"> </span><span class=\"ff1f\">1,067 <span class=\"_ _b9\"> </span></span>152 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:374.9461px;\">Other rec<span class=\"_ _1\"/><span class=\"_ _2e9\">eivables1</span><span class=\"_ _9a\"> </span><span class=\"ff1f\">381 <span class=\"_ _b9\"> </span></span>123 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:360.87686px;\">Loans rec<span class=\"_ _1\"/>eivable<span class=\"_ _19e\"> </span><span class=\"ff1f ls72 ws8b\">76<span class=\"_ _4f\"/> <span class=\"_ _165\"> </span><span class=\"ff20\">75 </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:346.8076px;\">Lease rec<span class=\"_ _1\"/>eivables<span class=\"_ _273\"> </span><span class=\"ff1f ls6a ws83\">35 <span class=\"_ _210\"> </span></span>18 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:332.7481px;\">Inter<span class=\"_ _1\"/>est rec<span class=\"_ _1\"/>eivable<span class=\"_ _292\"> </span><span class=\"ff1f\">19 <span class=\"_ _ae\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:234.72214px; bottom:318.67886px;\">1,578 <span class=\"_ _da\"> </span><span class=\"ff20\">368 </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:301.6651px;\">(b) R<span class=\"_ _1\"/>eceivables (non-curr<span class=\"_ _1\"/>ent)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:287.59586px;\">Other rec<span class=\"_ _1\"/>eivables<span class=\"_ _24d\"> </span><span class=\"ff1f ls2a ws36\">75 <span class=\"_ _13f\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:273.5266px;\">Loans rec<span class=\"_ _1\"/>eivable<span class=\"_ _292\"> </span><span class=\"ff1f ls2a ws36\">724 <span class=\"_ _189\"> </span></span><span class=\"ls47 ws82\">627 </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:259.4671px;\">Lease rec<span class=\"_ _1\"/>eivables<span class=\"_ _272\"> </span><span class=\"ff1f\">46 <span class=\"_ _18a\"> </span></span><span class=\"ls6c ws85\">26 </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:245.39786px;\">De\ufb01ned bene\ufb01t plan asset<span class=\"_ _40\"> </span><span class=\"ff1f\">-<span class=\"_ _a8\"> </span></span>33 </div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:240.39807px; bottom:231.32861px;\">845 <span class=\"_ _da\"> </span><span class=\"ff20\">686 </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:217.80534px;\">1. <span class=\"_ _29\"> </span>Inter<span class=\"_ _1\"/>est-free and settlement t<span class=\"_ _1\"/>erms are usually betw<span class=\"_ _1\"/>een 14 and 30 day<span class=\"_ _1\"/>s.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:184.32268px;\">Recognition and measurement<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls26 ws0\" style=\"bottom:168.72269px;\">Trade receivables are initially recognised at the transaction price </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls26 ws0\" style=\"bottom:153.12659px;\">determined under AASB 15/ IFRS 15 <span class=\"ff23\">Revenue from Contracts with </span></div><div class=\"t m0 h6 ff23 fs3 fc1 sc0 ls26 ws2e\" style=\"bottom:137.53049px;\">Customers<span class=\"ff20 ws0\">. Other receivables are initially recognised at fair value. </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls26 ws0\" style=\"bottom:121.93439px;\">Receivables that satisfy the contractual cash \ufb02ow and business </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls26 ws0\" style=\"bottom:106.33829px;\">model tests are subsequently measured at amortised cost less </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls26 ws0\" style=\"bottom:90.74218px;\">an allowance for uncollectable amounts. Uncollectable amounts </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls26 ws0\" style=\"bottom:75.14608px;\">are determined using the expected loss impairment model. </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls26 ws0\" style=\"bottom:59.54998px;\">Collectability and impairment are assessed on a regular basis.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:930.63837px;\"><span class=\"_ _2e9\">Subsequent recoveries of amounts previously written off are </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:915.0423px;\">credited against other expenses in the consolidated income </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:899.44617px;\">statement. Certain receivables that do not satisfy the contractual </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:883.8501px;\">cash \ufb02ow and business model tests are subsequently measured </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:868.25397px;\">at fair value (refer to Note D.6).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:845.28687px;\">The Group\u2019s customers are required to pay in accordance with </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:829.6908px;\">agreed payment terms. Depending on the product, settlement </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:814.09467px;\">terms are 14 to 30 days from the date of invoice or bill of lading </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:798.4986px;\">and customers regularly pay on time. There are no signi\ufb01cant </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:782.90247px;\">overdue trade receivables as at the end of the reporting period </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:767.3064px;\">(2021: nil).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:739.28436px;\">Fair value<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:723.6844px;\">The carrying amount of trade and other receivables </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:708.08826px;\">approximates their fair value.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:680.12915px;\">Foreign exchange risk<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:664.5292px;\">The Group held $174 million of receivables at 31 December </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:648.93304px;\">2022 (2021: $121 million) in currencies other than US dollars </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:633.337px;\">(predominantly Australian dollars).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:605.3741px;\">Loans receivable<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:589.7741px;\">On 9 January 2020, Woodside Energy Finance (UK) Ltd entered </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:574.178px;\">into a secured loan agreement with Petrosen (the Senegal </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:558.5819px;\">National Oil Company), to provide up to $450 million for the </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:542.9858px;\">purpose of funding Sangomar project costs. The facility has a </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:527.3897px;\">maximum term of 12 years and semi-annual repayments of the </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:511.79358px;\">loan are due to commence at the earlier of 12 months after RFSU </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:496.1975px;\">or 30 June 2025. The carrying amount of the loan receivable is </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:480.60138px;\">$408 million at 31 December 2022 (2021: $335 million), which </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:465.00528px;\">approximates its fair value. The remaining balance of loans </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:449.40918px;\">receivable is due from non-controlling interests.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 wsaa\" style=\"left:342.73032px; bottom:416.4339px;\">D<span class=\"_ _1\"/>.3 Inv<span class=\"_ _0\"/>entories<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:576.8685px; bottom:386.35178px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _188\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:574.4908px; bottom:372.29227px;\">US$m<span class=\"_ _102\"> </span><span class=\"ff20\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:355.27853px;\">(a) Inv<span class=\"_ _1\"/>entories (<span class=\"_ _1\"/>current)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:341.21902px;\">Petroleum pr<span class=\"_ _1\"/>oducts<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:327.14978px;\">Goods in transit<span class=\"_ _1ab\"> </span><span class=\"ff1f ls14 ws19\">95<span class=\"_ _4f\"/> <span class=\"_ _5\"> </span></span><span class=\"ls6a ws83\">35 </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:313.08054px;\">Finished stocks<span class=\"_ _76\"> </span><span class=\"ff1f\">103 <span class=\"_ _18a\"> </span></span>34 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:299.0113px;\">W<span class=\"_ _1\"/>ar<span class=\"_ _1\"/>ehouse stor<span class=\"_ _1\"/>es and materials<span class=\"_ _1aa\"> </span><span class=\"ff1f\">480 <span class=\"_ _169\"> </span></span>133 </div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls70 ws89\" style=\"left:584.2656px; bottom:284.95178px;\">678 <span class=\"_ _fa\"> </span><span class=\"ff20 ls0 ws0\">202 </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:267.93802px;\">(b) In<span class=\"_ _1\"/>vent<span class=\"_ _1\"/>ories (non-current)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:253.86877px;\">W<span class=\"_ _1\"/>ar<span class=\"_ _1\"/>ehouse stor<span class=\"_ _1\"/>es and materials<span class=\"_ _20f\"> </span><span class=\"ff1f\">11 <span class=\"_ _163\"> </span></span>19 </div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:592.6893px; bottom:239.79953px;\">11 <span class=\"_ _163\"> </span><span class=\"ff20\">19 </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:206.16606px;\">Recognition and measurement </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:190.56606px;\">Inventories include hydrocarbon stocks, consumable supplies </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:174.96996px;\">and maintenance spares. Inventories are valued at the lower of </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:159.37386px;\">cost and net realisable value. Cost is determined on a weighted </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:143.77776px;\">average basis and includes direct costs and an appropriate </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:128.18166px;\">portion of \ufb01xed and variable production overheads where </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:112.585556px;\">applicable. Inventories determined to be obsolete or damaged </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:96.989456px;\">are written down to net realisable value, being the estimated </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:81.39336px;\">selling price less selling costs.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">D<span class=\"_ _1\"/>. Other asse<span class=\"_ _1\"/>ts and liabilities<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">138<span class=\"_ _24\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 wsab\" style=\"bottom:927.4895px;\">D<span class=\"_ _1\"/>.4 Pa<span class=\"_ _1\"/>y<span class=\"_ _1\"/>ables<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:904.5194px;\">The following table shows the Group\u2019s payables balances. </div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:240.39807px; bottom:874.43744px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _c2\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:237.66821px; bottom:860.36816px;\">US$m<span class=\"_ _f5\"> </span><span class=\"ff20\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:843.35443px;\">T<span class=\"_ _0\"/>rade pay<span class=\"_ _1\"/><span class=\"_ _2e9\">ables1</span><span class=\"_ _275\"> </span><span class=\"ff1f ls2a ws36\">759 <span class=\"_ _188\"> </span></span>191 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:829.28516px;\">Other pay<span class=\"_ _1\"/><span class=\"_ _2e9\">ables1</span><span class=\"_ _2e\"> </span><span class=\"ff1f ls70 ws89\">1,2<span class=\"_ _4f\"/>70 <span class=\"_ _f4\"> </span></span>390 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:815.21594px;\">Inter<span class=\"_ _1\"/>est pay<span class=\"_ _1\"/><span class=\"_ _2e9\">able2</span><span class=\"_ _275\"> </span><span class=\"ff1f\">65 <span class=\"_ _fa\"> </span></span>58 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:801.14667px;\">T<span class=\"_ _0\"/>otal pay<span class=\"_ _1\"/>ables<span class=\"_ _145\"> </span><span class=\"ff1f\">2,094 <span class=\"_ _b4\"> </span></span><span class=\"ls6b ws84\">639 </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:784.15424px;\">1. <span class=\"_ _29\"> </span>Inter<span class=\"_ _1\"/>est-free and normally settled on 30 da<span class=\"_ _1\"/>y terms. </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:770.08563px;\">2.  Details regarding int<span class=\"_ _1\"/>erest-bearing liabilities ar<span class=\"_ _1\"/>e contained in Note C.2. </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:903.2194px;\">Recognition and measurement<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:887.61945px;\">Trade and other payables are carried at amortised cost and are </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:872.0233px;\">recognised when goods and services are received, whether or </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:856.42725px;\">not billed to the Group, prior to the end of the reporting period.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:828.46436px;\">Fair value<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:812.8644px;\">The carrying amount of payables approximates their fair value.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:784.9093px;\">Foreign exchange risk<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:769.30927px;\">The Group held $657 million of payables at 31 December 2022  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:753.7132px;\">(2021: $311 million) in currencies other than US dollars </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:738.11707px;\">(predominantly Australian dollars).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:710.1541px;\">Maturity pro\ufb01le of payables<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:694.5541px;\">The Group\u2019s payables balances at 31 December 2022 and 31 </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:678.958px;\">December 2021 are due for payment within a year.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 wsac\" style=\"bottom:646.0139px;\">D<span class=\"_ _1\"/>.5 Pr<span class=\"_ _1\"/>o<span class=\"_ _1\"/>visions<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:258.5085px; bottom:605.5318px;\">Restor<span class=\"_ _1\"/>ation</div><div class=\"t m0 hab ff22 fs54 fc0 sc0 ls0 ws0\" style=\"left:306.95807px; bottom:608.7785px;\">1<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:317.46637px; bottom:605.5318px;\">Employ<span class=\"_ _1\"/>ee bene\ufb01ts<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:446.7428px; bottom:615.93506px;\">Onerous </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:440.76135px; bottom:605.5318px;\">contr<span class=\"_ _1\"/>acts<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hab ff22 fs54 fc0 sc0 ls0 ws0\" style=\"left:480.94525px; bottom:608.7785px;\">2<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:546.6717px; bottom:605.5318px;\">Other<span class=\"_ _65\"> </span>T<span class=\"_ _1\"/>otal </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:283.6591px; bottom:590.7898px;\">US$m<span class=\"_ _9d\"> </span>US$m<span class=\"_ _a1\"> </span>US$m<span class=\"_ _9d\"> </span>US$m<span class=\"_ _a1\"> </span>US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:573.776px;\">Y<span class=\"_ _0\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:559.03406px;\">At 1 January 2022<span class=\"_ _271\"> </span><span class=\"ff1f\">2,218 <span class=\"_ _a6\"> </span>286 <span class=\"_ _7c\"> </span>214 <span class=\"_ _7d\"> </span>106 <span class=\"_ _105\"> </span>2,824 </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:544.29205px;\">Acquisitions thr<span class=\"_ _1\"/><span class=\"_ _2e9\">ough business combination3</span><span class=\"_ _110\"> </span><span class=\"ff1f\">4,310 <span class=\"_ _67\"> </span>329 <span class=\"_ _71\"> </span>-<span class=\"_ _ec\"> </span>165 <span class=\"_ _9f\"> </span>4,804 </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:529.55005px;\">Change in pro<span class=\"_ _1\"/>vision<span class=\"_ _13c\"> </span><span class=\"ff1f\">(382)<span class=\"_ _a6\"> </span>(98)<span class=\"_ _6b\"> </span>(216)<span class=\"_ _7c\"> </span>137 <span class=\"_ _5a\"> </span>(559)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:514.80804px;\">Unwinding of pr<span class=\"_ _1\"/>esent value discount<span class=\"_ _aa\"> </span><span class=\"ff1f\">107 <span class=\"_ _71\"> </span>-<span class=\"_ _17e\"> </span>2 <span class=\"_ _293\"> </span>1 <span class=\"_ _86\"> </span>110 </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:500.06604px;\">Carrying amount at 31 December 2022<span class=\"_ _1a3\"> </span><span class=\"fc1\">6,253 <span class=\"_ _6d\"> </span>517 <span class=\"_ _71\"> </span>-<span class=\"_ _7d\"> </span>409 <span class=\"_ _5a\"> </span>7<span class=\"_ _0\"/>,17<span class=\"_ _1\"/>9 </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:485.32404px;\">Current <span class=\"_ _294\"> </span><span class=\"ff1f ls87 wsad\">575<span class=\"_ _4f\"/> <span class=\"_ _6d\"> </span></span><span class=\"ff1f\">331 <span class=\"_ _71\"> </span>-<span class=\"_ _ec\"> </span>313 <span class=\"_ _5a\"> </span>1,219 </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:470.58203px;\">Non-current <span class=\"_ _151\"> </span><span class=\"ff1f\">5,678 <span class=\"_ _7c\"> </span>186 <span class=\"_ _71\"> </span>-<span class=\"_ _9c\"> </span>96 <span class=\"_ _10b\"> </span>5,960 </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:455.84003px;\">Net carrying amount<span class=\"_ _282\"> </span><span class=\"fc1\">6,253 <span class=\"_ _6d\"> </span>517 <span class=\"_ _293\"> </span>-<span class=\"_ _80\"> </span>409 <span class=\"_ _5a\"> </span>7<span class=\"_ _0\"/>,17<span class=\"_ _1\"/>9 </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:441.09802px;\">Y<span class=\"_ _0\"/>ear ended 31 December 2021<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:426.35602px;\">At 1 January 2021<span class=\"_ _295\"> </span>2,<span class=\"_ _1\"/>134 <span class=\"_ _80\"> </span>295 <span class=\"_ _177\"> </span>349 <span class=\"_ _86\"> </span>129 <span class=\"_ _9d\"> </span>2,907 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:411.61404px;\">Change in pro<span class=\"_ _1\"/>vision<span class=\"_ _17c\"> </span>60 <span class=\"_ _fc\"> </span>(9)<span class=\"_ _63\"> </span>(140)<span class=\"_ _7c\"> </span>(23)<span class=\"_ _177\"> </span>(112)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:396.87204px;\">Unwinding of pr<span class=\"_ _1\"/>esent value discount<span class=\"_ _296\"> </span><span class=\"ls60 ws6e\">24 <span class=\"_ _293\"> </span></span>-<span class=\"_ _17e\"> </span>5 <span class=\"_ _293\"> </span>-<span class=\"_ _26b\"> </span>29 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:382.13004px;\">Carrying amount at 31 December 2021<span class=\"_ _c8\"> </span>2,<span class=\"_ _4f\"/>218 <span class=\"_ _177\"> </span>286 <span class=\"_ _f3\"> </span>214 <span class=\"_ _6d\"> </span>106 <span class=\"_ _106\"> </span>2,824 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:367.38803px;\">Current <span class=\"_ _294\"> </span>235 <span class=\"_ _80\"> </span><span class=\"ls47 ws82\">269 <span class=\"_ _293\"> </span></span>-<span class=\"_ _fc\"> </span>101 <span class=\"_ _67\"> </span>605 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:352.64603px;\">Non-current <span class=\"_ _297\"> </span>1,983 <span class=\"_ _26b\"> </span>17 <span class=\"_ _86\"> </span>214 <span class=\"_ _298\"> </span>5 <span class=\"_ _5a\"> </span>2,219 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:337.90402px;\">Net carrying amount<span class=\"_ _17d\"> </span>2,218 <span class=\"_ _177\"> </span>286 <span class=\"_ _86\"> </span>214 <span class=\"_ _7c\"> </span>106 <span class=\"_ _106\"> </span>2,824 </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:324.3922px;\">1. <span class=\"_ _29\"> </span>2022 change in pro<span class=\"_ _1\"/>vision is due to a r<span class=\"_ _1\"/>evision of disc<span class=\"_ _1\"/>ount rat<span class=\"_ _1\"/>es of $978 million (primarily due t<span class=\"_ _1\"/>o an increase in risk fr<span class=\"_ _1\"/>ee rat<span class=\"_ _1\"/>es) and pro<span class=\"_ _1\"/><span class=\"_ _2e9\">visions used of $262 million, offset b</span><span class=\"_ _1\"/>y </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:313.47223px;\">changes in estimates of $858 million. Changes in estima<span class=\"_ _1\"/>tes are due t<span class=\"_ _1\"/>o new activities, incr<span class=\"_ _1\"/>ease in scope of remo<span class=\"_ _1\"/>v<span class=\"_ _1\"/>al and cost and ra<span class=\"_ _1\"/>te escalations supported b<span class=\"_ _1\"/>y the most </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:302.55222px;\">rec<span class=\"_ _1\"/>ent estimates and benchmarks. </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:287.8102px;\">2.  2022 change in pro<span class=\"_ _1\"/>vision is due to changes in estimates of $2<span class=\"_ _1\"/><span class=\"_ _2e9\">45 million offset b</span><span class=\"_ _1\"/>y pro<span class=\"_ _1\"/>visions used of $29 million.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:274.2694px;\">3.  Acquisitions through busines<span class=\"_ _1\"/>s combination hav<span class=\"_ _1\"/>e been rec<span class=\"_ _1\"/>ognised on a pro<span class=\"_ _1\"/>visional basis. Adjustmen<span class=\"_ _1\"/>ts will be made to the pro<span class=\"_ _1\"/>visional amounts if new inf<span class=\"_ _1\"/>ormation is </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:263.34943px;\">obtained within 12 months from the acquisition da<span class=\"_ _1\"/>te. Refer t<span class=\"_ _1\"/>o Note B.5 for details. </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:229.86505px;\">Recognition and measurement<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:214.26506px;\">Provisions are recognised when the Group has a present </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:198.66896px;\">obligation (legal or constructive) as a result of a past event, it </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:183.07286px;\">is probable that an out\ufb02ow of resources embodying economic </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:167.47676px;\">bene\ufb01ts will be required to settle the obligation and a reliable </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:151.88066px;\">estimate can be made of the amount of the obligation.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:123.90987px;\">Restoration<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:108.30986px;\">The restoration provision is \ufb01rst recognised in the period in </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:92.71376px;\">which the obligation arises. The nature of restoration activities </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:77.11766px;\">includes the removal of facilities, abandonment of wells and </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:61.52156px;\"><span class=\"_ _2e9\">restoration of affected areas. Restoration provisions are updated </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:45.92546px;\">annually, with the corresponding movement recognised </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:231.18326px;\">against the related exploration and evaluation assets or oil </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:215.58716px;\">and gas properties or expensed for late life projects with no </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:199.99106px;\">corresponding asset.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:177.02396px;\">Over time, the liability is increased for the change in the present </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:161.42786px;\">value based on a pre-tax discount rate appropriate to the </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:145.83176px;\">risks inherent in the liability. The unwinding of the discount </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:130.23566px;\">is recorded as an accretion charge within \ufb01nance costs. </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:114.63956px;\">The carrying amount capitalised in oil and gas properties is </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:99.04346px;\">depreciated over the useful life of the related asset (refer to </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:83.44736px;\">Note B.3).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:60.480263px;\">Costs incurred that relate to an existing condition caused by  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:44.884163px;\">past operations, and which do not have a future economic </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:29.288063px;\">bene\ufb01t, are expensed.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">D<span class=\"_ _1\"/>. Other asse<span class=\"_ _1\"/>ts and liabilities<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls14 ws19\" style=\"left:651.3286px; bottom:1.4145012px;\">139<span class=\"_ _49\"/><span class=\"ff1e fc5 ls0 ws0\">W<span class=\"_ _1\"/>oodside Energy Group L<span class=\"_ _1\"/>td      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:708.1664px;\">K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:687.5813px;\">(a) <span class=\"_ _0\"/>Restoration obligations<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:674.5813px;\">The Group estimates the future decommissioning and remediation<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:661.5813px;\"><span class=\"_ _2e9\">costs of offshore oil and gas platforms, offshore and onshore<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:648.5813px;\"><span class=\"_ _2e9\">production facilities, wells and pipelines at different stages of the<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:635.5813px;\">development and construction of assets or facilities. In many instances,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:622.5813px;\">decommissioning of assets occurs many years into the future.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:602.2077px;\">The Group\u2019s restoration obligations are based on compliance with<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:589.2077px;\"><span class=\"_ _2e9\">the requirements of relevant regulations which vary for different<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:576.2077px;\">jurisdictions. For example Australian regulations require full removal for<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:563.2077px;\"><span class=\"_ _2e9\">offshore assets unless regulator approval is received to decommission<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:550.2077px;\">in-situ. The Group maintains technical expertise to ensure that industry<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:537.2077px;\">learnings, scienti\ufb01c research and local and international guidelines are<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:524.2077px;\">reviewed in assessing its restoration obligations.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:503.8341px;\">The restoration obligation requires judgemental assumptions regarding<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:490.8341px;\">removal date, environmental legislation and regulations, the extent<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:477.8341px;\">of restoration activities required, the engineering methodology for<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:464.83408px;\">estimating cost, technologies used in determining the decommissioning<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:451.83408px;\">cost, and liability-speci\ufb01c discount rates to determine the present value<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:438.83408px;\">of these cash \ufb02ows.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:418.46048px;\">The Group applies either the \u2018expected outcome\u2019 approach or \u2018expected<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:405.46048px;\"><span class=\"_ _2e9\">value\u2019 approach in assessing the cost estimate, re\ufb02ecting a difference in<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:392.46048px;\">approach to cost estimation for heritage Woodside and heritage BHPP<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:379.46048px;\">assets. Both approaches are supported by AASB 137/ IAS 37 <span class=\"ff23 ws20\">Provisions,<span class=\"_ _2e9\"> </span></span><span class=\"ff23 ws20\"> </span></div><div class=\"t m0 h7 ff23 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:366.46048px;\">Contingent Liabilities and Contingent Assets<span class=\"ff20\">, produce reliable estimates<span class=\"_ _2e9\"> </span></span><span class=\"ff20\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:353.46048px;\">and are widely used in practice. Heritage Woodside assets refer to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:340.46048px;\">assets held by the Group prior to the BHPP merger. Heritage BHPP<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:327.46048px;\">assets refers to assets acquired from BHP but excludes the commonly<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:314.46048px;\">held assets by both heritage entities.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff22 fs56 fc0 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:290.20105px;\">Expected out<span class=\"_ _1\"/>come appr<span class=\"_ _1\"/>oach<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:277.20105px;\">This approach is used for heritage Woodside assets, and those<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:264.20105px;\">assets commonly held by both heritage entities. The following cost<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:11.078209px; bottom:251.20105px;\">assumptions are applied:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:11.078209px; bottom:230.82745px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">for onshore assets, provision has been made for the removal of<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:21.213531px; bottom:217.82745px;\">production facilities and above ground pipelines using current<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:21.213531px; bottom:204.82745px;\">restoration standards and techniques and taking into account risks<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:21.213531px; bottom:191.82745px;\">and uncertainties; and<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:11.078209px; bottom:173.29465px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\"><span class=\"_ _2e9\">for offshore assets, provision has been made for the plug and<span class=\"_ _2e9\"> </span></span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:21.213531px; bottom:160.29465px;\"><span class=\"_ _2e9\">abandonment of wells and the removal of offshore platform topsides,<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:21.213531px; bottom:147.29465px;\"><span class=\"_ _2e9\">\ufb02oating production storage offloading (FPSO) and some subsea<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:21.213531px; bottom:134.29465px;\">infrastructure. It is currently the Group\u2019s assumption that in some<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:21.213531px; bottom:121.29465px;\">regulatory jurisdictions and environments, certain pipelines and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:21.213531px; bottom:108.29465px;\"><span class=\"_ _2e9\">infrastructure, parts of offshore platform substructures, and certain<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:691.4747px;\">subsea infrastructure are decommissioned in-situ where it can be<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:678.4747px;\">demonstrated that this will deliver equal or better environmental<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:665.4747px;\">outcomes than full removal and that regulatory approval is obtained<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:652.4747px;\">where arrangements are satisfactory to the regulator.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff22 fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:628.2112px;\">Expected v<span class=\"_ _1\"/>alue approach<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:615.2112px;\">This approach is used for heritage BHPP assets (excluding those<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:602.2112px;\">commonly held by both heritage entities).<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:581.8376px;\"><span class=\"_ _2e9\">For both onshore and offshore assets, provision has been made taking<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:568.8376px;\">into consideration a risked range of possible removal outcomes,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:555.8376px;\">including full removal of certain assets. Individual site provisions are<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:542.8376px;\">an estimate of the expected value of future cash \ufb02ows required to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:529.8376px;\">rehabilitate the relevant site using current restoration standards and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:516.8376px;\">techniques and taking into account risks and uncertainties. Individual<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:503.8376px;\">site provisions are discounted to their present value using country<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:490.8376px;\">speci\ufb01c discount rates aligned to the estimated timing of cash out\ufb02ows.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff22 fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:466.57114px;\">Inherent unc<span class=\"_ _1\"/>ertainties<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:453.57114px;\">The basis of the restoration obligation provision for assets with<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:440.57114px;\">approved decommissioning plans or general directions issued by the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:427.57114px;\"><span class=\"_ _2e9\">regulator can differ from the assumptions disclosed above. Whilst<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:414.57114px;\">the provisions re\ufb02ect the Group\u2019s best estimate based on current<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:401.57114px;\">knowledge and information, further studies and detailed analysis of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws39\" style=\"left:342.73032px; bottom:388.57114px;\">restoration activities for individual assets will be performed near the end<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:375.57114px;\">of their operational life and/or when detailed decommissioning plans<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:362.57114px;\">are required to be submitted to the relevant regulatory authorities.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:349.57114px;\"><span class=\"_ _2e9\">Actual costs and cash out\ufb02ows can materially differ from the current<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:336.57114px;\">estimate as a result of changes in regulations and their application,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:323.57114px;\">prices, analysis of site conditions, further studies, timing of restoration<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:310.57114px;\">and changes in removal technology. These uncertainties may result in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:297.57114px;\"><span class=\"_ _2e9\">actual expenditure differing from amounts included in the provision<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:284.57114px;\">recognised as at 31 December 2022.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:264.19754px;\">A range of pre-tax discount rates between 3.4% and 4.7% (2021: 0.4%<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:251.19754px;\">to 2.4%) has been applied. If the discount rates were decreased by 0.5%<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:238.19754px;\">then the provision would be $316 million higher. If the cost estimates<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:225.19754px;\">were increased by 10% then the provision would be $627 million higher.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:212.19754px;\">The proportion of the non-current balance not expected to be settled<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:199.19754px;\">within 10 years is <span class=\"ws20\">54% </span>(2021: 65%).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:174.93095px;\">(b) <span class=\"_ _13b\"/>Legal case outcomes<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:161.93095px;\">Provisions for legal cases are measured at the present value of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:148.93095px;\">amount expected to settle the claim. Management is required to use<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:135.93095px;\">judgement when assessing the likely outcome of legal cases, estimating<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:122.930954px;\">the risked amount and whether a provision or contingent liability should<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:342.73032px; bottom:109.930954px;\">be recognised.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">D<span class=\"_ _1\"/>.5 <span class=\"_ _fd\"> </span>Pro<span class=\"_ _1\"/>visions (c<span class=\"_ _1\"/>ont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">Employee bene\ufb01ts<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:883.93445px;\">Provision is made for employee bene\ufb01ts accumulated as a result<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:868.3384px;\">of employees rendering services up to the end of the reporting<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:852.74225px;\">period. These bene\ufb01ts include wages, salaries, annual leave and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:837.1462px;\">long service leave.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:814.1791px;\">Liabilities in respect of employees\u2019 services rendered that are not<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:798.58295px;\">expected to be wholly settled within one year after the end of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:782.9869px;\">the period in which the employees render the related services  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:767.39075px;\">are recognised as long-term employee bene\ufb01ts.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:339.47772px; bottom:900.8644px;\">These liabilities are measured at the present value of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:339.47772px; bottom:885.26825px;\">estimated future cash out\ufb02ow to the employees using the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:339.47772px; bottom:869.6722px;\">projected unit credit method. Liabilities expected to be wholly<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:339.47772px; bottom:854.07605px;\">settled within one year after the end of the period in which the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:339.47772px; bottom:838.48px;\">employees render the related services are classi\ufb01ed as short-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:339.47772px; bottom:822.88385px;\">term bene\ufb01ts and are measured at the amount due to be paid.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:339.47772px; bottom:794.8793px;\">Onerous contract provision<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:339.47772px; bottom:779.27924px;\">Provision is made for loss-making contracts at the present value<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:339.47772px; bottom:763.68317px;\">of the lower of the net cost of ful\ufb01lling and the cost arising from<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:339.47772px; bottom:748.08704px;\">failure to ful\ufb01ll each contract.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">D<span class=\"_ _1\"/>. Other asse<span class=\"_ _1\"/>ts and liabilities<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">140<span class=\"_ _1d\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:7.5782204px; bottom:894.95886px;\">(c) <span class=\"_ _1\"/>Onerous contracts<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:7.5782204px; bottom:881.95886px;\">The onerous contract provision assessment requires management<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:7.5782204px; bottom:868.95886px;\">to make certain estimates regarding the unavoidable costs and the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:7.5782204px; bottom:855.95886px;\">expected economic bene\ufb01ts from the contract. These estimates<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:7.5782204px; bottom:842.95886px;\">require signi\ufb01cant management judgement and are subject to risk and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:7.5782204px; bottom:829.95886px;\"><span class=\"_ _2e9\">uncertainty, and hence changes in economic conditions can affect the<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:7.5782204px; bottom:816.95886px;\">assumptions.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:7.5782204px; bottom:796.58527px;\">As at 31 December 2022, the Corpus Christi contract is expected<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:7.5782204px; bottom:783.58527px;\">to return a positive value and on this basis the provision has<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:7.5782204px; bottom:770.58527px;\">been reversed to nil (2021: $214 million). Changes in assumptions<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:7.5782204px; bottom:757.58527px;\">predominantly relating to the narrowing of the spread between the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:7.5782204px; bottom:744.58527px;\">sales price and purchase price could result in the contract becoming<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:7.5782204px; bottom:731.58527px;\">onerous in the future.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:7.5782204px; bottom:711.2117px;\">Assumptions used to determine the present value as at 31 December<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:7.5782204px; bottom:698.2117px;\">2022 are set out below:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:7.5782204px; bottom:677.838px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">Remaining contract term \u2013 18 years.<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:7.5782204px; bottom:659.30524px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">Discount rate \u2013 a pre-tax, risk free US government bond rate <span class=\"ls0\"> </span></span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:18.199997px; bottom:646.30524px;\">of 4.10<span class=\"ws0\">% (2021: 1.855%) has been applied.<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:7.5782204px; bottom:627.78284px;\">\u2022 <span class=\"_ _29\"> </span><span class=\"ws0\">LNG pricing \u2013 forecast sales and purchase prices are subject to<span class=\"_ _2e9\"> </span></span><span class=\"ws0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:18.199997px; bottom:614.78284px;\">a number of price markers. Price assumptions are based on the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:18.199997px; bottom:601.78284px;\">best information on the market available at measurement date<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:18.199997px; bottom:588.78284px;\">and derived from short- and long-term views of global supply<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:18.199997px; bottom:575.78284px;\">and demand, building upon past experience of the industry and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:18.199997px; bottom:562.78284px;\">consistent with external sources. The forecasted sales are linked<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:18.199997px; bottom:549.78284px;\">to gas hub prices (Title Transfer Facility (TTF)) at which physical<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:18.199997px; bottom:536.78284px;\">sales are expected to occur and incorporate known sales pricing<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:18.199997px; bottom:523.78284px;\">information<span class=\"ls0 ws0\"><span class=\"_ _2e9\"> </span><span class=\"ls1a\">. The long-term gas sales price is estimated on the basis<span class=\"_ _2e9\"> </span></span></span><span class=\"ls0 ws0\"><span class=\"ls1a\"> </span></span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:18.199997px; bottom:510.78284px;\">of the Group\u2019s Brent price forecast. The estimated purchase price<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:18.199997px; bottom:497.78284px;\">is linked to US gas hub prices (Henry Hub (HH)) at which physical<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:18.199997px; bottom:484.78284px;\">purchases are expected to occur. The nominal TTF, Brent oil prices<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:18.199997px; bottom:471.78284px;\">and HH gas prices used at 31 December 2022 were:<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:120.710724px; bottom:450.0007px;\">202<span class=\"_ _4f\"/>3<span class=\"_ _df\"> </span>2<span class=\"_ _4f\"/>024<span class=\"_ _e2\"> </span>2<span class=\"_ _4f\"/>025<span class=\"_ _e2\"> </span>202<span class=\"_ _4f\"/>6<span class=\"_ _c5\"> </span>2027<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:8.955307px; bottom:435.9412px;\">TTF (US$/MMBtu)<span class=\"_ _164\"> </span><span class=\"ls88 wsae\">4<span class=\"_ _4f\"/>7.<span class=\"_ _50\"/>9<span class=\"_ _d9\"> </span></span>36.4<span class=\"_ _d9\"> </span>22.3<span class=\"_ _b5\"> </span>8.8<span class=\"_ _e1\"> </span><span class=\"ls6e ws87\">9.0<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:8.955307px; bottom:421.87195px;\">Brent (US$/bbl)<span class=\"_ _a4\"> </span><span class=\"ls47 ws82\">87<span class=\"_ _d8\"> </span>78<span class=\"_ _c0\"> </span><span class=\"ls7f ws9a\">74<span class=\"_ _c0\"> </span><span class=\"ls80 ws9c\">76<span class=\"_ _c3\"> </span></span></span></span><span class=\"_ _2e9\">77\u00b2<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:8.955307px; bottom:407.8027px;\">HH (US$/MMBtu)<span class=\"_ _8c\"> </span><span class=\"ls69 ws81\">6<span class=\"_ _4f\"/>.1<span class=\"_ _e3\"> </span><span class=\"ls6e ws87\">4.7<span class=\"_ _c3\"> </span>4.0<span class=\"_ _d8\"> </span></span>4<span class=\"_ _4f\"/>.1<span class=\"_ _e0\"> </span></span><span class=\"_ _2e9\">4.23<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:7.5782204px; bottom:386.85333px;\">1.  For committed volumes, contracted pricing has been applied.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:7.5782204px; bottom:368.56232px;\">2. <span class=\"_ _4f\"/>Long-term oil prices are based on US$70/bbl (2022 real terms) from 2025<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:16.605682px; bottom:357.64233px;\">and prices are escalated at 2.0% onwards.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:7.5782204px; bottom:339.35132px;\">3. <span class=\"_ _4f\"/>Long-term gas prices are based on US$3.8/MMBtu (2022 real terms) from<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:16.605682px; bottom:328.4313px;\">2025. All long-term prices are escalated at 2.0%.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"left:342.73032px; bottom:927.4895px;\">D<span class=\"_ _1\"/>.6 <span class=\"_ _fd\"> </span>Other \ufb01nancial as<span class=\"_ _1\"/>sets and liabilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:576.8685px; bottom:897.40753px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _188\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:574.4908px; bottom:883.33826px;\">US$m<span class=\"_ _102\"> </span><span class=\"ff20\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:866.3245px;\">Other \ufb01nancial assets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:850.3053px;\">Financial instruments at fair v<span class=\"_ _1\"/>alue through<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:840.5553px;\">pro\ufb01t and loss<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:824.536px;\">Derivativ<span class=\"_ _1\"/>e \ufb01nancial instruments designat<span class=\"_ _1\"/>ed<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:814.786px;\">as hedges<span class=\"_ _8a\"> </span><span class=\"ff1f\">20<span class=\"_ _1\"/>7 <span class=\"_ _17f\"> </span><span class=\"ff20\">134<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:800.7168px;\">Other \ufb01nancial assets<span class=\"_ _21\"> </span><span class=\"ff1f\">22 <span class=\"_ _189\"> </span></span>293<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:786.6475px;\">Financial instruments at amortised cos<span class=\"_ _1\"/>t<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:772.57825px;\">Hedge collater<span class=\"_ _1\"/>al (including inter<span class=\"_ _1\"/>est)<span class=\"_ _16a\"> </span><span class=\"ff1f\">509 <span class=\"_ _ae\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:758.50903px;\">Other \ufb01nancial assets<span class=\"_ _64\"> </span><span class=\"ff1f\">30 <span class=\"_ _13f\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:744.43976px;\">Financial instruments at fair v<span class=\"_ _1\"/>alue through<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:734.68976px;\">other compr<span class=\"_ _1\"/>ehensive income<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:720.62054px;\">Other \ufb01nancial assets<span class=\"_ _21\"> </span><span class=\"ff1f\">29 <span class=\"_ _ae\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:703.60675px;\">T<span class=\"_ _0\"/>otal other \ufb01nancial assets<span class=\"_ _276\"> </span><span class=\"fc1 lsa wsf\">797 <span class=\"_ _fa\"> </span><span class=\"ff20 ls47 ws82\">4<span class=\"_ _4f\"/>27<span class=\"_ _2e9\"> </span></span></span><span class=\"fc1 lsa wsf\"><span class=\"ff20 ls47 ws82\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:686.593px;\">Current<span class=\"_ _28\"> </span><span class=\"ff1f\">677 <span class=\"_ _fa\"> </span></span>320<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:672.52374px;\">Non-current<span class=\"_ _157\"> </span><span class=\"ff1f\">120 <span class=\"_ _17f\"> </span></span>107<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:655.51px;\">Net carrying amount<span class=\"_ _299\"> </span><span class=\"ff1f lsa wsf\">797 <span class=\"_ _189\"> </span></span><span class=\"ls47 ws82\">427<span class=\"_ _2e9\"> </span></span><span class=\"ls47 ws82\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:638.4963px;\">Other \ufb01nancial liabilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:622.477px;\">Financial instruments at fair v<span class=\"_ _1\"/>alue through<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:612.727px;\">pro\ufb01t and loss<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:596.70776px;\">Derivativ<span class=\"_ _1\"/>e \ufb01nancial instruments designat<span class=\"_ _1\"/>ed<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:586.95776px;\">as hedges<span class=\"_ _144\"> </span><span class=\"ff1f\">721 <span class=\"_ _fa\"> </span></span>563<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:572.88855px;\">Other \ufb01nancial liabilities<span class=\"_ _40\"> </span><span class=\"ff1f\">-<span class=\"_ _13f\"> </span></span>9<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:555.87476px;\">T<span class=\"_ _0\"/>otal other \ufb01nancial liabilities<span class=\"_ _30\"> </span><span class=\"fc1\">7<span class=\"_ _1\"/>21 <span class=\"_ _164\"> </span><span class=\"ff20 ls7e ws99\">572<span class=\"_ _4f\"/> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:541.81525px;\">Current<span class=\"_ _2b\"> </span><span class=\"ff1f\">654 <span class=\"_ _bc\"> </span></span>411<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:527.74603px;\">Non-current <span class=\"_ _29a\"> </span><span class=\"ff1f ls70 ws89\">67 <span class=\"_ _17a\"> </span></span>161<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:513.67676px;\">Net carrying amount<span class=\"_ _29b\"> </span><span class=\"ff1f\">721 <span class=\"_ _ba\"> </span></span><span class=\"ls7e ws99\">57<span class=\"_ _4f\"/>2<span class=\"_ _2e9\"> </span></span><span class=\"ls7e ws99\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:480.1062px;\">Recognition and measurement<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:459.52124px;\">Other \ufb01nancial assets and liabilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:443.92123px;\">Receivables subject to provisional pricing adjustments are<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:428.32513px;\">initially recognised at the transaction price and subsequently<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:412.72903px;\">measured at fair value with movements recognised in the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:397.13293px;\">consolidated income statement.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:369.16617px;\">Derivative \ufb01nancial instruments<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:353.56616px;\">Derivative \ufb01nancial instruments that are designated within<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:337.97006px;\">qualifying hedge relationships are initially recognised at fair<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:322.37396px;\">value on the date the contract is entered into. For relationships<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:306.77786px;\">designated as fair value hedges, subsequent fair value<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:291.18176px;\">movements of the derivative are recognised in the consolidated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:275.58566px;\">income statement.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:252.61856px;\">For relationships designated as cash \ufb02ow hedges, subsequent<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:237.02246px;\"><span class=\"_ _2e9\">fair value movements of the derivative for the effective portion<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:221.42636px;\">of the hedge are recognised in other comprehensive income<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:205.83028px;\">and accumulated in reserves in equity; fair value movements<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:190.23418px;\"><span class=\"_ _2e9\">for the ineffective portion are recognised immediately in the<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:174.63808px;\">consolidated income statement. Costs of hedging have been<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:159.04198px;\">separated from the hedging arrangements and deferred to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:143.44588px;\">other comprehensive income and accumulated in reserves in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:127.84978px;\">equity. Amounts accumulated in equity are reclassi\ufb01ed to the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:112.25368px;\">consolidated income statement in the periods when the hedged<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:96.65758px;\"><span class=\"_ _2e9\">item affects pro\ufb01t or loss.<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">D<span class=\"_ _1\"/>.5 <span class=\"_ _fd\"> </span>Pro<span class=\"_ _1\"/>visions (c<span class=\"_ _1\"/>ont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">D<span class=\"_ _1\"/>. Other asse<span class=\"_ _1\"/>ts and liabilities<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls34 ws3c\" style=\"left:653.27094px; bottom:1.4145012px;\">141<span class=\"_ _49\"/><span class=\"ff1e fc5 ls0 ws0\">Woodside Ener<span class=\"_ _1\"/>gy Group Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">D<span class=\"_ _1\"/>.6 <span class=\"_ _fd\"> </span>Other \ufb01nancial as<span class=\"_ _1\"/>sets and liabilities (c<span class=\"_ _1\"/>ont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">Derivative \ufb01nancial instruments  (cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:883.93445px;\"><span class=\"_ _2e9\">Hedge effectiveness is determined at the inception of the hedge<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:868.3384px;\"><span class=\"_ _2e9\">relationship, and through periodic prospective effectiveness<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:852.74225px;\">assessments to ensure that an economic relationship exists<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:837.1462px;\">between the hedged exposure and the hedging instrument.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:821.55005px;\">The Group assesses whether the derivative designated in each<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:805.954px;\"><span class=\"_ _2e9\">hedging relationship has been, and is expected to be, effective in<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:790.35785px;\"><span class=\"_ _2e9\">offsetting changes in cash \ufb02ows of the hedged exposure using<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:774.7618px;\">the hypothetical derivative method.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:751.7947px;\"><span class=\"_ _2e9\">Ineffectiveness is recognised where the cumulative change in<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:736.19855px;\">the designated component value of the hedging instrument on<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:720.6025px;\">an absolute basis exceeds the change in value of the hedged<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:705.00635px;\">exposure attributable to the hedged risk.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:682.03925px;\"><span class=\"_ _2e9\">Ineffectiveness may arise where the timing of the transaction<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:666.4432px;\">changes from what was originally estimated such as delayed<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:650.84705px;\">shipments or changes in timing of forecast sales. This may also<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:635.251px;\">arise where the commodity swap pricing terms do not perfectly<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:619.65485px;\">match the pricing terms of the LNG revenue contracts.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:591.6391px;\">Fair value<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:576.03906px;\">Except for the other \ufb01nancial assets and other \ufb01nancial liabilities<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:560.443px;\">set out in this note, there are no material \ufb01nancial assets or<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:544.84686px;\">\ufb01nancial liabilities carried at fair value.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:521.87976px;\">The fair value of commodity derivative \ufb01nancial instruments<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:506.2837px;\">is determined based on observable quoted forward pricing<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:490.68756px;\">and swap models and is classi\ufb01ed as Level 2 on the fair value<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:475.09146px;\">hierarchy. The most frequently applied valuation techniques<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:459.49536px;\">include forward pricing and swap models that use present value<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:443.89926px;\">calculations. The models incorporate various inputs including the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:428.30316px;\">credit quality of counterparties and forward rate curves of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:412.70706px;\">underlying commodity.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:389.73996px;\">The fair value of interest rate swaps is calculated by discounting<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:374.14386px;\">estimated future cash \ufb02ows based on the terms of maturity<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:358.54776px;\">of each contract, using market interest rates for a similar<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:342.95166px;\">instrument at the reporting date and is classi\ufb01ed as Level 2  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:327.35556px;\">on the fair value hierarchy.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:304.38846px;\">The fair value of foreign exchange forward contracts is<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:288.79236px;\">determined using quoted forward exchange rates at the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:273.19626px;\">reporting date and present value calculations based on high<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:257.60016px;\">credit quality yield curves in the respective currencies and is<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:242.00406px;\">classi\ufb01ed as Level 2 on the fair value hierarchy.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:900.91296px;\">The fair values of other \ufb01nancial assets and other \ufb01nancial<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:885.3169px;\">liabilities are predominantly determined based on observable<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:869.72076px;\">quoted forward pricing and are predominantly classi\ufb01ed as  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:854.1247px;\">Level 2 on the fair value hierarchy.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:826.0792px;\">Foreign exchange<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:810.47925px;\">The derivative \ufb01nancial instruments include foreign exchange<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:794.8832px;\">forward contracts that are denominated in Australian dollars.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:779.28705px;\">The Group had no material other \ufb01nancial assets and liabilities<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:763.691px;\">denominated in currencies other than US dollars.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:735.72406px;\">Hedging activities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:720.124px;\">During the period, the following hedging activities were<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:704.52795px;\">undertaken:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:681.56085px;\">\u2022 <span class=\"_ _4b\"> </span>The Group hedged a percentage of its oil-linked exposure,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:665.9647px;\">entering into oil swap derivatives settling in 2023 in order to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:650.36865px;\">achieve a minimum average sales price of $75 per barrel.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:631.08704px;\">\u2022 <span class=\"_ _4b\"> </span>The Group entered into additional separate HH commodity<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:615.49097px;\">swaps to hedge the purchase leg of the Corpus Christi<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:599.89484px;\">volumes and separate TTF commodity swaps to hedge the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:584.29877px;\">sales leg of Corpus Christi volumes to mitigate pricing risk for<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:568.70264px;\">2023 to 2024.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:549.421px;\">\u2022 <span class=\"_ _4b\"> </span>As a result of hedging activities, approximately 49% of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:533.82495px;\">Corpus Christi volumes included in stock in transit for 2022,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:518.2288px;\">approximately 82% of 2023 volumes and approximately 29%<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:502.63275px;\">of 2024 volumes have hedged pricing risk.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:483.35114px;\">\u2022 <span class=\"_ _4b\"> </span>The Group restruck $150 million of the TTF hedges to reduce<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:467.75504px;\">the derivative \ufb01nancial liability.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:448.47345px;\">\u2022 <span class=\"_ _4b\"> </span>The Group restruck $92 million of the oil swap hedges to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:432.87735px;\">reduce the derivative \ufb01nancial liability. Further, the Group also<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:417.28125px;\">voluntarily placed $506 million as collateral against the oil<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:401.68515px;\">hedge positions to reduce counterparty credit risk exposure.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:386.08905px;\">The collateral will mature in line with hedge settlements  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:370.49295px;\">in 2023.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:351.21136px;\">\u2022 <span class=\"_ _4b\"> </span>Through the use of foreign exchange forward contracts, the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:335.61526px;\">Group hedged its Australian dollar to US dollar exchange rate<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:320.01917px;\">in relation to a portion of the Australian dollar denominated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:304.42307px;\">capital expenditure expected to be incurred under the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:288.82693px;\">Scarborough development<span class=\"_ _2e9\"> </span>.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">D<span class=\"_ _1\"/>. Other asse<span class=\"_ _1\"/>ts and liabilities<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">142<span class=\"_ _1a\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">D<span class=\"_ _1\"/>.6 <span class=\"_ _fd\"> </span>Other \ufb01nancial as<span class=\"_ _1\"/>sets and liabilities (c<span class=\"_ _1\"/>ont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">Hedging activities (cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:228.49802px; bottom:858.1023px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _18a\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:841.0885px;\">Oil swaps (<span class=\"_ _1\"/>cash \ufb02ow hedges<span class=\"_ _1\"/>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:827.0193px;\">Carrying amount (US$m)<span class=\"_ _276\"> </span><span class=\"ff1f\"> (114)<span class=\"_ _8c\"> </span></span> (1)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:812.95px;\">Notional amount (MMbbl)<span class=\"_ _48\"> </span><span class=\"ff1f\"> 18 <span class=\"_ _a8\"> </span></span> 30<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:798.8808px;\">Maturity date<span class=\"_ _273\"> </span><span class=\"ff1f\">2023<span class=\"_ _df\"> </span></span>2022-2023<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:784.8115px;\">Hedge ratio<span class=\"_ _43\"> </span><span class=\"ff1f\"> 1:1 <span class=\"_ _a5\"> </span></span><span class=\"ls7d ws98\">1:1<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:770.7423px;\">W<span class=\"_ _1\"/>eighted a<span class=\"_ _1\"/>ver<span class=\"_ _1\"/>age hedged ra<span class=\"_ _1\"/>te (US$/MMbbl)<span class=\"_ _bd\"> </span><span class=\"ff1f ls26 ws2e\"> 79 <span class=\"_ _ac\"> </span></span><span class=\"ls7f ws9a\"> 74<span class=\"_ _4f\"/> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:753.7285px;\">HH Corpus Christi c<span class=\"_ _1\"/>ommodity swaps (<span class=\"_ _1\"/>cash<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:743.9785px;\">\ufb02ow hedges<span class=\"_ _1\"/>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:729.9093px;\">Carrying amount (US$m)<span class=\"_ _48\"> </span><span class=\"ff1f ls6c ws85\"> 26 <span class=\"_ _8c\"> </span></span> 31<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:715.84px;\">Notional amount (TBtu)<span class=\"_ _198\"> </span><span class=\"ff1f\"> 58 <span class=\"_ _143\"> </span></span><span class=\"ls6c ws85\"> 65<span class=\"_ _2e9\"> </span></span><span class=\"ls6c ws85\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:701.77075px;\">Maturity date<span class=\"_ _40\"> </span><span class=\"ff1f\"> 2023-202<span class=\"_ _1\"/>4 <span class=\"_ _c1\"> </span><span class=\"ff20\">2022-2023<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:687.70154px;\">Hedge ratio<span class=\"_ _43\"> </span><span class=\"ff1f\"> 1:1 <span class=\"_ _a5\"> </span></span><span class=\"ls7d ws98\">1:1<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:673.63226px;\">W<span class=\"_ _1\"/>eighted a<span class=\"_ _1\"/>ver<span class=\"_ _1\"/>age hedged ra<span class=\"_ _1\"/>te (US$/MMBtu)<span class=\"_ _a5\"> </span><span class=\"ff1f\"> 4 <span class=\"_ _14a\"> </span></span> 3<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:656.6185px;\">TTF Corpus Christi c<span class=\"_ _1\"/>ommodity swaps (<span class=\"_ _1\"/>cash<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:646.8685px;\">\ufb02ow hedges<span class=\"_ _1\"/>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:632.79926px;\">Carrying amount (US$m)<span class=\"_ _29c\"> </span><span class=\"ff1f\"> (469)<span class=\"_ _dd\"> </span></span> (465)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:618.73004px;\">Notional amount (TBtu)<span class=\"_ _197\"> </span><span class=\"ff1f\"> 50 <span class=\"_ _160\"> </span></span><span class=\"ls47 ws82\"> 49<span class=\"_ _2e9\"> </span></span><span class=\"ls47 ws82\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:604.66077px;\">Maturity date<span class=\"_ _40\"> </span><span class=\"ff1f\"> 2023-202<span class=\"_ _1\"/>4 <span class=\"_ _c1\"> </span><span class=\"ff20\">2022-2023<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:590.59155px;\">Hedge ratio<span class=\"_ _43\"> </span><span class=\"ff1f\"> 1:1 <span class=\"_ _a5\"> </span></span><span class=\"ls7d ws98\">1:1<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:576.53204px;\">W<span class=\"_ _1\"/>eighted a<span class=\"_ _1\"/>ver<span class=\"_ _1\"/>age hedged ra<span class=\"_ _1\"/>te (US$/MMBtu)<span class=\"_ _bd\"> </span><span class=\"ff1f\"> 16 <span class=\"_ _a5\"> </span></span> 9<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:559.51825px;\">TTF commodity sw<span class=\"_ _1\"/>aps (cash \ufb02o<span class=\"_ _1\"/>w hedges)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:545.44904px;\">Carrying amount (US$m)<span class=\"_ _146\"> </span><span class=\"ff1f\"> - <span class=\"_ _a5\"> </span></span> 4<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:531.37976px;\">Notional amount (TBtu)<span class=\"_ _29d\"> </span><span class=\"ff1f\"> - <span class=\"_ _14a\"> </span></span> 3<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:517.31055px;\">Maturity date<span class=\"_ _29e\"> </span><span class=\"ff1f\"> - <span class=\"_ _dd\"> </span></span> 2022<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:503.25104px;\">Hedge ratio<span class=\"_ _25\"> </span><span class=\"ff1f\"> - <span class=\"_ _a5\"> </span></span><span class=\"ls7d ws98\">1:1<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:489.18176px;\">W<span class=\"_ _1\"/>eighted a<span class=\"_ _1\"/>ver<span class=\"_ _1\"/>age hedged ra<span class=\"_ _1\"/>te (US$/MMBtu)<span class=\"_ _a2\"> </span><span class=\"ff1f\"> - <span class=\"_ _143\"> </span></span><span class=\"ls6c ws85\"> 26<span class=\"_ _2e9\"> </span></span><span class=\"ls6c ws85\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:472.16803px;\">Interes<span class=\"_ _1\"/>t rat<span class=\"_ _1\"/>e swap (<span class=\"_ _1\"/>cash \ufb02ow hedges<span class=\"_ _1\"/>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:458.0988px;\">Carrying amount (US$m)<span class=\"_ _166\"> </span><span class=\"ff1f ls73 ws8c\"> 55 <span class=\"_ _210\"> </span></span> (17)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:444.02954px;\">Notional amount (US$m)<span class=\"_ _29f\"> </span><span class=\"ff1f\"> 600 <span class=\"_ _b8\"> </span></span> 600<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:429.97003px;\">Maturity date<span class=\"_ _273\"> </span><span class=\"ff1f ls47 ws82\">2027<span class=\"_ _16c\"> </span><span class=\"ff20\">2027<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:415.9008px;\">Hedge ratio<span class=\"_ _43\"> </span><span class=\"ff1f\"> 1:1 <span class=\"_ _a5\"> </span></span><span class=\"ls7d ws98\">1:1<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:401.83154px;\">W<span class=\"_ _1\"/>eighted a<span class=\"_ _1\"/>ver<span class=\"_ _1\"/>age hedged ra<span class=\"_ _1\"/>te<span class=\"_ _110\"> </span><span class=\"ff1f lsa wsf\">1.7%<span class=\"_ _163\"> </span></span>1.7%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:384.81778px;\">Cross curr<span class=\"_ _1\"/>ency inter<span class=\"_ _1\"/>est rat<span class=\"_ _1\"/>e swap (<span class=\"_ _1\"/>cash \ufb02ow<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:375.06778px;\">and fair value hedges<span class=\"_ _1\"/>)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:361.00827px;\">Carrying amount (US$m)<span class=\"_ _198\"> </span><span class=\"ff1f\"> 5 <span class=\"_ _a5\"> </span></span> 9<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:346.93903px;\">Notional amount (Swiss F<span class=\"_ _1\"/>ranc)<span class=\"_ _1aa\"> </span><span class=\"ff1f\"> 175 <span class=\"_ _7\"> </span></span> 175<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:332.86978px;\">Maturity date<span class=\"_ _273\"> </span><span class=\"ff1f\">2023<span class=\"_ _169\"> </span></span>2023<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:318.80054px;\">Hedge ratio<span class=\"_ _43\"> </span><span class=\"ff1f\"> 1:1 <span class=\"_ _a5\"> </span></span><span class=\"ls7d ws98\">1:1<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:275.49103px;\">W<span class=\"_ _1\"/>eighted a<span class=\"_ _1\"/>ver<span class=\"_ _1\"/>age hedged ra<span class=\"_ _1\"/>te</div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:224.22986px; bottom:304.74103px;\"> Three<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:202.53036px; bottom:294.99103px;\">month USD<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:224.22986px; bottom:285.24103px;\">LIBOR <span class=\"_ _27a\"/> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:225.39178px; bottom:275.49103px;\">+2.8% </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:259.87064px; bottom:296.28778px;\"> Thr<span class=\"_ _1\"/>ee month <span class=\"_ _27a\"/> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:267.63504px; bottom:285.88452px;\">USD LIBOR <span class=\"_ _27a\"/> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:290.12567px; bottom:275.4813px;\">+2.8%<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:258.46753px;\">FX forwar<span class=\"_ _1\"/>ds (cash \ufb02o<span class=\"_ _1\"/>w hedges)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:244.39828px;\">Carrying amount (US$m)<span class=\"_ _28c\"> </span><span class=\"ff1f\"> (17)<span class=\"_ _141\"> </span></span> 10<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:230.32904px;\">Notional amount (AUD$m)<span class=\"_ _8b\"> </span><span class=\"ff1f ls70 ws89\"> 1<span class=\"_ _4f\"/>,037 <span class=\"_ _169\"> </span></span> 934<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:216.25978px;\">Maturity date<span class=\"_ _29d\"> </span><span class=\"ff1f\"> 2023-20<span class=\"_ _1\"/>25 <span class=\"_ _183\"> </span><span class=\"ff20\"> 2022-2025<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:202.19054px;\">Hedge Ratio<span class=\"_ _255\"> </span><span class=\"ff1f\"> 1:1 <span class=\"_ _13e\"> </span></span><span class=\"ls7d ws98\">1<span class=\"_ _4f\"/>:1<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:188.13103px;\">W<span class=\"_ _1\"/>eighted a<span class=\"_ _1\"/>ver<span class=\"_ _1\"/>age hedged ra<span class=\"_ _1\"/>te (A<span class=\"_ _1\"/>UD:USD)<span class=\"_ _8c\"> </span><span class=\"ff1f\"> 0.68 <span class=\"_ _169\"> </span></span><span class=\"ls6e ws87\"> 0.7<span class=\"_ _4f\"/>1<span class=\"_ _2e9\"> </span></span><span class=\"ls6e ws87\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:159.59927px;\"><span class=\"_ _2e9\">Hedge ineffectiveness loss of $72 million (2021: $38 million loss)<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:144.00317px;\">has been recognised in the pro\ufb01t and loss.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:899.5344px;\">Other \ufb01nancial assets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:883.93445px;\">Other \ufb01nancial assets measured at fair value include receivables<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:868.3384px;\">subject to provisional pricing adjustments of nil (2021:  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:852.74225px;\">$163 million) and repurchase agreements entered into for<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:837.1462px;\">the purposes of net settlement rather than for physical delivery<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:821.55005px;\">of nil (2021: $69 million).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:793.5792px;\">Interest Rate Benchmark Reform<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:777.97925px;\">A fundamental reform of major interest rate benchmarks is<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:762.3832px;\">being undertaken globally, including the replacement of some<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:746.78705px;\"><span class=\"_ _2e9\">interbank offered rates (IBORs) with alternative nearly risk-free<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:731.191px;\">rates (referred to as \u2018IBOR reform\u2019). The Group has exposures<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:715.59485px;\">to IBORs on its \ufb01nancial instruments that will be impacted as<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:699.9988px;\">part of these market-wide initiatives. The Group's main IBOR<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:684.40265px;\">exposure at the reporting date is USD LIBOR. In 2020, the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:668.8066px;\">Federal Reserve announced that the three-month and six-month<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:653.21045px;\">LIBOR will be phased out and eventually replaced by June 2023.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:630.24335px;\">During the period, the Group has transitioned a number of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:614.6473px;\">\ufb01nancial liabilities from USD LIBOR to SOFR and is in the process<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:599.05115px;\">of transitioning the remaining \ufb01nancial instruments to alternative<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:583.4551px;\">benchmark rates. The Group has \ufb01nancial liabilities and \ufb01nancial<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:567.85895px;\">assets with a total carrying value of $670 million (2021:  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:552.2629px;\">$957 million) and $393 million (2021: $367 million) respectively,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:536.66675px;\">which reference USD LIBOR.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:513.69965px;\">The Group has the following hedging relationships which are<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:498.10358px;\">exposed to interest rate benchmarks impacted by IBOR Reform:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:475.13644px;\">\u2022 <span class=\"_ _4b\"> </span>Interest rate swaps to hedge the LIBOR interest rate risk<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:459.54034px;\">associated with the $600 million syndicated facility (refer to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:443.94424px;\">Note C.2). The interest rate swaps are designated as cash \ufb02ow<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:428.34814px;\">hedges, converting the variable interest into \ufb01xed interest US<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:412.75204px;\">dollar debt, and mature in 2027.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:393.47046px;\">\u2022 <span class=\"_ _4b\"> </span>A \ufb01xed rate 175 million Swiss Franc (CHF) denominated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:377.87436px;\">medium term note, which it hedges with cross-currency<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:362.27826px;\">interest rate swaps designated in both fair value and cash \ufb02ow<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:346.68216px;\">hedge relationships. The cross-currency interest rate swaps<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:331.08606px;\">are referenced to LIBOR (refer to Note C.2).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:311.80444px;\">The transition of a number of the Group\u2019s \ufb01nancial liabilities from<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:296.20834px;\">USD LIBOR to SOFR during the year ended 31 December 2022<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:280.61224px;\">did not result in a material impact to the Group. The Group\u2019s<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:265.01614px;\">Treasury function continues to execute the transition of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:249.42004px;\">remaining \ufb01nancial instruments from current benchmark rates  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:233.82394px;\">to alternative benchmark rates.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:356.82153px; bottom:196.50888px;\">K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc5 ff1f fs56 fce sc0 ls0 ws0\" style=\"left:356.82153px; bottom:175.9239px;\">Fair v<span class=\"_ _1\"/>alue of other \ufb01nancial assets and liabilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:162.9239px;\">Estimates have been applied in the measurement of other \ufb01nancial<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:149.9239px;\">assets and liabilities and, where required, judgement is applied in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:136.9239px;\">the settlement of any \ufb01nancial assets or liabilities. In the current<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:123.923904px;\">period, this included a $3 million periodic adjustment relating to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:110.923904px;\">timing which increased other \ufb01nancial liabilities, re\ufb02ecting the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:97.923904px;\">arrangements governing Wheatstone LNG sales (2021: $56 million<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws20\" style=\"left:356.82153px; bottom:84.9239px;\">increase). </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">D<span class=\"_ _1\"/>. Other asse<span class=\"_ _1\"/>ts and liabilities<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"left:651.3286px; bottom:1.4145012px;\">143<span class=\"_ _49\"/><span class=\"ff1e fc5\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 wsaf\" style=\"bottom:927.4895px;\">D<span class=\"_ _1\"/>.7 L<span class=\"_ _1\"/>eases<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:171.45116px; bottom:896.7575px;\">Land and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:173.31223px; bottom:887.0075px;\">buildings<span class=\"_ _2e9\"> </span></div><div class=\"t m3e hbb ff1f fs4b fc1 sc0 ls16 ws0\" style=\"left:229.9401px; bottom:897.40753px;\">Plant and<span class=\"_ _2e9\"> </span> </div><div class=\"t m3e hbb ff1f fs4b fc1 sc0 ls16 ws1b\" style=\"left:221.60126px; bottom:887.0043px;\">equipment<span class=\"_ _2e9\"> </span></div><div class=\"t m3f hab ff22 fs54 fc1 sc0 ls0 ws0\" style=\"left:265.65292px; bottom:890.2543px;\">2<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:294.32507px; bottom:887.0075px;\">T<span class=\"_ _0\"/>otal<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:186.71654px; bottom:872.9383px;\">US$m<span class=\"_ _d8\"> </span>US$m<span class=\"_ _dc\"> </span>US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:853.7308px;\">Lease assets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:839.6615px;\">Y<span class=\"_ _0\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:825.5923px;\">Carrying amount at 1 January 2022<span class=\"_ _8c\"> </span><span class=\"ff1f\">377 <span class=\"_ _dd\"> </span><span class=\"ls70 ws89\">703 <span class=\"_ _d4\"> </span></span>1,080<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:811.523px;\">Acquisitions thr<span class=\"_ _1\"/>ough business<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:801.773px;\"><span class=\"_ _2e9\">combination1</span><span class=\"_ _185\"> </span><span class=\"ff1f\">120 <span class=\"_ _bc\"> </span>22 <span class=\"_ _b5\"> </span>142<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:787.7038px;\">Additions<span class=\"_ _87\"> </span><span class=\"ff1f\">4 <span class=\"_ _188\"> </span>238 <span class=\"_ _f5\"> </span><span class=\"ls2a ws36\">242<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ls2a ws36\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:773.6345px;\">Lease remeasur<span class=\"_ _1\"/>ements<span class=\"_ _117\"> </span><span class=\"ff1f\">5 <span class=\"_ _fa\"> </span>103 <span class=\"_ _e1\"> </span>108<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:759.56525px;\">Depreciation<span class=\"_ _aa\"> </span><span class=\"ff1f ls6e ws87\">(4<span class=\"_ _4f\"/>2)<span class=\"_ _102\"> </span></span><span class=\"ff1f\">(266)<span class=\"_ _181\"> </span>(308)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:742.5515px;\">Carrying amount at 31 December 2022<span class=\"_ _e1\"> </span><span class=\"fc1\">464 <span class=\"_ _15e\"> </span>800 <span class=\"_ _c4\"> </span>1,264<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:725.5378px;\">At 31 Dec<span class=\"_ _1\"/>ember 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:711.4685px;\">Historical c<span class=\"_ _1\"/>ost and remeasur<span class=\"_ _1\"/>ements<span class=\"_ _143\"> </span><span class=\"ff1f\">591 <span class=\"_ _15e\"> </span>1,311 <span class=\"_ _dc\"> </span>1,902<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:697.3993px;\">Accumula<span class=\"_ _1\"/>ted deprecia<span class=\"_ _1\"/>tion, impairment<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:687.6493px;\">and disposals<span class=\"_ _197\"> </span><span class=\"ff1f\">(127)<span class=\"_ _15f\"> </span>(511)<span class=\"_ _d5\"> </span>(638)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:670.6355px;\">Net carrying amount<span class=\"_ _f2\"> </span><span class=\"fc1\">464 <span class=\"_ _15e\"> </span>800 <span class=\"_ _c4\"> </span>1,264<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:652.66626px;\">Lease liabilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:638.59705px;\">Y<span class=\"_ _0\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:624.5278px;\">At 1 January 2022<span class=\"_ _88\"> </span><span class=\"ff1f ls70 ws89\">437 <span class=\"_ _95\"> </span></span><span class=\"ff1f\">930 <span class=\"_ _d5\"> </span>1,367<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:610.46826px;\">Acquisitions thr<span class=\"_ _1\"/>ough business<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:600.71826px;\"><span class=\"_ _2e9\">combination1</span><span class=\"_ _10f\"> </span><span class=\"ff1f ls2a ws36\">245 <span class=\"_ _bc\"> </span></span><span class=\"ff1f\">23 <span class=\"_ _f5\"> </span>268<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:586.64905px;\">Additions<span class=\"_ _cb\"> </span><span class=\"ff1f\">1 <span class=\"_ _fa\"> </span>189 <span class=\"_ _e1\"> </span>190<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:572.5798px;\">Repayments (principal and int<span class=\"_ _1\"/>erest)<span class=\"_ _7\"> </span><span class=\"ff1f\">(60)<span class=\"_ _102\"> </span>(305)<span class=\"_ _d5\"> </span>(365)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:558.5105px;\">Accr<span class=\"_ _1\"/>etion of inter<span class=\"_ _1\"/>est<span class=\"_ _30\"> </span><span class=\"ff1f\">25 <span class=\"_ _16c\"> </span><span class=\"ls6b ws84\">78 <span class=\"_ _c3\"> </span></span>103<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:544.4413px;\">Lease remeasur<span class=\"_ _1\"/>ements<span class=\"_ _126\"> </span><span class=\"ff1f\">(25)<span class=\"_ _17f\"> </span>96 <span class=\"_ _47\"> </span>71<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:527.4275px;\">Carrying amount at 31 December 2022<span class=\"_ _e3\"> </span><span class=\"fc1\">623 <span class=\"_ _176\"> </span>1,011 <span class=\"_ _dc\"> </span>1,634<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:510.41376px;\">Current <span class=\"_ _2d\"> </span><span class=\"ff1f\">48 <span class=\"_ _188\"> </span><span class=\"ls72 ws8b\">276 <span class=\"_ _b2\"> </span><span class=\"ls2a ws36\">324<span class=\"_ _4f\"/> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:496.35425px;\">Non-current<span class=\"_ _40\"> </span><span class=\"ff1f ls87 wsad\">575<span class=\"_ _4f\"/> <span class=\"_ _188\"> </span><span class=\"lsa wsf\">735 <span class=\"_ _b3\"> </span></span></span><span class=\"ff1f\">1<span class=\"_ _4f\"/>,310<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:479.3405px;\">Carrying amount at 31 December 2022<span class=\"_ _e3\"> </span><span class=\"fc1\">623 <span class=\"_ _176\"> </span>1,011 <span class=\"_ _dc\"> </span>1,634<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:461.37128px;\">Lease assets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:447.30203px;\">Y<span class=\"_ _0\"/>ear ended 31 December 2021<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:433.24252px;\">Carrying amount at 1 January 2021<span class=\"_ _13e\"> </span><span class=\"ls75 ws8f\">392 <span class=\"_ _da\"> </span>592<span class=\"_ _4f\"/> <span class=\"_ _f5\"> </span></span>984<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:419.17328px;\">Additions<span class=\"_ _213\"> </span>14 <span class=\"_ _164\"> </span>214 <span class=\"_ _c3\"> </span>228<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:405.10403px;\">Lease remeasur<span class=\"_ _1\"/>ements<span class=\"_ _1a1\"> </span>15 <span class=\"_ _103\"> </span>16 <span class=\"_ _176\"> </span>31<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:391.03476px;\">Disposals at written do<span class=\"_ _1\"/>wn value<span class=\"_ _179\"> </span>(12)<span class=\"_ _9e\"> </span>- <span class=\"_ _c0\"> </span>(12)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:374.02103px;\">Depreciation<span class=\"_ _2a0\"> </span>(32)<span class=\"_ _94\"> </span>(119)<span class=\"_ _e1\"> </span>(151)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:357.00726px;\">Carrying amount at 31 December 2021<span class=\"_ _94\"> </span>377 <span class=\"_ _188\"> </span><span class=\"ls72 ws8b\">703<span class=\"_ _4f\"/> <span class=\"_ _181\"> </span></span>1,080<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:342.94778px;\">At 31 Dec<span class=\"_ _1\"/>ember 2021<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:328.8785px;\">Historical c<span class=\"_ _1\"/>ost<span class=\"_ _2f\"> </span>462 <span class=\"_ _188\"> </span>948 <span class=\"_ _f6\"> </span>1,410<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:311.86478px;\">Accumula<span class=\"_ _1\"/>ted deprecia<span class=\"_ _1\"/>tion and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:302.11478px;\">impairment<span class=\"_ _109\"> </span>(85)<span class=\"_ _b4\"> </span>(245)<span class=\"_ _b3\"> </span>(330)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:287.85052px;\">Net carrying amount<span class=\"_ _118\"> </span>377 <span class=\"_ _188\"> </span><span class=\"ls72 ws8b\">703 <span class=\"_ _d5\"> </span></span>1,080<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:269.89102px;\">Lease liabilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:255.82178px;\">Y<span class=\"_ _0\"/>ear ended 31 December 2021<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:241.75253px;\">At 1 January 2021<span class=\"_ _18c\"> </span>484 <span class=\"_ _188\"> </span>794 <span class=\"_ _db\"> </span><span class=\"ls47 ws82\">1,278<span class=\"_ _4f\"/> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:227.68326px;\">Additions<span class=\"_ _104\"> </span>7 <span class=\"_ _188\"> </span>2<span class=\"_ _1\"/>44 <span class=\"_ _b6\"> </span>251<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:210.66953px;\">Repayments (principal and int<span class=\"_ _1\"/>erest)<span class=\"_ _a8\"> </span>(70)<span class=\"_ _15e\"> </span>(192)<span class=\"_ _d6\"> </span><span class=\"ls6c ws85\">(262)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:196.60027px;\">Accr<span class=\"_ _1\"/>etion of inter<span class=\"_ _1\"/>est<span class=\"_ _30\"> </span>25 <span class=\"_ _18a\"> </span><span class=\"ls6e ws87\">72<span class=\"_ _4f\"/> <span class=\"_ _c2\"> </span><span class=\"ls4 ws8\">97<span class=\"_ _2e9\"> </span></span></span><span class=\"ls6e ws87\"><span class=\"ls4 ws8\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:179.58652px;\">Lease remeasur<span class=\"_ _1\"/>ements <span class=\"_ _27c\"> </span>(9)<span class=\"_ _165\"> </span>12 <span class=\"_ _94\"> </span>3<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:162.57277px;\">Carrying amount at 31 December 2021<span class=\"_ _dd\"> </span><span class=\"ls16 ws1b\">437<span class=\"_ _4f\"/> <span class=\"_ _dd\"> </span></span>930 <span class=\"_ _db\"> </span>1,367<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:148.50352px;\">Current <span class=\"_ _76\"> </span>19 <span class=\"_ _17f\"> </span>172 <span class=\"_ _c0\"> </span>191<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:131.48978px;\">Non-current<span class=\"_ _e7\"> </span>418 <span class=\"_ _da\"> </span>758 <span class=\"_ _c6\"> </span>1,<span class=\"_ _1\"/>176<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:117.42052px;\">Carrying amount at 31 December 2021<span class=\"_ _dd\"> </span><span class=\"ls16 ws1b\">437<span class=\"_ _4f\"/> <span class=\"_ _dd\"> </span></span>930 <span class=\"_ _db\"> </span>1,367<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:104.00946px;\">1. <span class=\"_ _29\"> </span>Acquisitions thr<span class=\"_ _1\"/>ough business combination ha<span class=\"_ _1\"/>ve been r<span class=\"_ _1\"/>ecognised on a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:93.08946px;\">pro<span class=\"_ _1\"/>visional basis. Adjustments will be made t<span class=\"_ _1\"/>o the pro<span class=\"_ _1\"/>visional amounts if new<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:82.16946px;\">information is obtained within 12 months fr<span class=\"_ _1\"/>om the acquisition date. R<span class=\"_ _1\"/>efer to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:71.24946px;\">Note B.5 for details.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:57.708656px;\">2.  Marine, vessels and carriers ha<span class=\"_ _1\"/>ve been included within plant and equipment f<span class=\"_ _1\"/>or<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:46.78866px;\">the year ended 31 Dec<span class=\"_ _1\"/>ember 2022. The 2021 amounts ha<span class=\"_ _1\"/>ve been r<span class=\"_ _1\"/>eclassi\ufb01ed to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:35.86866px;\">be present<span class=\"_ _1\"/>ed on the same basis.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:928.0095px;\">Recognition and measurement<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:912.40955px;\">When a contract is entered into, the Group assesses whether<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:896.8134px;\">the contract contains a lease. A lease arises when the Group<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:881.21735px;\">has the right to direct the use of an identi\ufb01ed asset which is not<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:865.6212px;\">substitutable and to obtain substantially all economic bene\ufb01ts<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:850.02515px;\">from the use of the asset throughout the period of use. The<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:834.429px;\">leases recognised by the Group predominantly relate to LNG<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:818.83295px;\">vessels, property and drilling rigs.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:795.86584px;\">The Group separates the lease and non-lease components of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:780.2697px;\">contract and accounts for these separately. The Group allocates<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:764.67365px;\">the consideration in the contract to each component on the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:749.0775px;\">basis of their relative stand-alone prices.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:721.0842px;\">Leases as a lessee<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:705.48425px;\">Lease assets and lease liabilities are recognised at the lease<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:689.8881px;\">commencement date, which is when the assets are available<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:674.29205px;\">for use. The assets are initially measured at cost, which is the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:658.6959px;\">present value of future lease payments adjusted for any lease<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:643.09985px;\">payments made at or before the commencement date, plus any<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:627.5037px;\">make-good obligations and initial direct costs incurred.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:604.5366px;\">Lease assets are depreciated using the straight-line method over<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:588.94055px;\">the shorter of their useful life and the lease term. Refer to Note<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:573.3444px;\">B.3 for the useful lives of assets. Periodic adjustments are made<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:557.74835px;\">for any re-measurements of the lease assets and for impairment<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:542.1522px;\">losses, assessed in accordance with the Group\u2019s impairment<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:526.55615px;\">policies.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:503.58905px;\">Lease liabilities are initially measured at the present value of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:487.99292px;\">future minimum lease payments, discounted using the Group\u2019s<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:472.39682px;\">incremental borrowing rate if the rate implicit in the lease cannot<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:456.80072px;\">be readily determined, and are subsequently measured at<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:441.20462px;\"><span class=\"_ _2e9\">amortised cost using the effective interest rate. Minimum lease<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:425.60852px;\">payments are \ufb01xed payments or index-based variable payments<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:410.01242px;\">incorporating the Group\u2019s expectations of extension options and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:394.41632px;\">do not include non-lease components of a contract. A portfolio<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:378.82022px;\">approach was taken when determining the implicit discount rate<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:363.22412px;\">for LNG vessels with similar terms and conditions on transition.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:340.25702px;\">The lease liability is remeasured when there are changes in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:324.66092px;\">future lease payments arising from a change in rates, index or<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:309.06482px;\">lease terms from exercising an extension or termination option.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:293.46872px;\">A corresponding adjustment is made to the carrying amount of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:277.87262px;\">the lease assets, with any excess recognised in the consolidated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:262.27652px;\">income statement.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:239.30942px;\">There are no restrictions placed upon the lessee by entering into<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:223.71332px;\">these leases.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:195.6488px;\">Short-term leases and leases of low value<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:180.0488px;\">Short-term leases (lease term of 12 months or less) and leases<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:164.4527px;\">of low value assets are recognised as incurred as an expense in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:148.8566px;\">the consolidated income statement. Low value assets comprise<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:133.2605px;\">plant and equipment.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:105.29373px;\">Foreign exchange risk<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:89.69373px;\">The Group held $441 million of lease liabilities at 31 December<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:74.09763px;\">2022 (2021: $476 million) in currencies other than the US dollar<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:58.501534px;\">(predominantly Australian dollars).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">D<span class=\"_ _1\"/>. Other asse<span class=\"_ _1\"/>ts and liabilities<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">144<span class=\"_ _1a\"> </span><span class=\"ff21 fc5\">|     Annual R<span class=\"_ _1\"/>eport 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4896px;\">D<span class=\"_ _1\"/>.7 <span class=\"_ _56\"> </span>Leases (<span class=\"_ _1\"/>cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5346px;\">Maturity pro\ufb01le of lease liabilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:883.9346px;\">The table below presents the contractual undiscounted cash<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:868.3385px;\">\ufb02ows associated with the Group\u2019s lease liabilities, representing<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:852.7424px;\">principal and interest. The \ufb01gures will not necessarily reconcile<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:837.1463px;\">with the amounts disclosed in the consolidated statement of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:821.5502px;\">\ufb01nancial position.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:234.72214px; bottom:803.1008px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _188\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:230.95502px; bottom:789.0316px;\">US$m<span class=\"_ _102\"> </span><span class=\"ff20\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:772.0178px;\">Due for payment in:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:757.9486px;\">1 year or les<span class=\"_ _1\"/>s<span class=\"_ _81\"> </span><span class=\"ff1f\"> 433 <span class=\"_ _95\"> </span></span> 283<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:743.87933px;\">1-2 year<span class=\"_ _1\"/>s<span class=\"_ _2a1\"> </span><span class=\"ff1f ls71 ws8a\"> 272 <span class=\"_ _dd\"> </span></span> 283<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:729.8101px;\">2-3 y<span class=\"_ _1\"/>ears<span class=\"_ _161\"> </span><span class=\"ff1f\"> 199 <span class=\"_ _c7\"> </span></span> 191<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:714.9608px;\">3-4 years<span class=\"_ _16f\"> </span><span class=\"ff1f\"> 186 <span class=\"_ _b9\"> </span></span> 171<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:700.90137px;\">4-5 years<span class=\"_ _1a9\"> </span><span class=\"ff1f\"> 176 <span class=\"_ _17f\"> </span></span> 161<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:686.8321px;\">More than 5 y<span class=\"_ _1\"/>ears<span class=\"_ _37\"> </span><span class=\"ff1f\"> 966 <span class=\"_ _dd\"> </span></span><span class=\"ls47 ws82\"> 789</span><span class=\"ls47 ws82\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:230.95502px; bottom:672.7628px;\"> 2,232 <span class=\"_ _102\"> </span><span class=\"ff20\"> 1,878<span class=\"_ _2e9\"> </span></span><span class=\"ff20\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:635.4093px;\">Lease commitments<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:619.80927px;\">The table below presents the contractual undiscounted cash<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:604.2132px;\">\ufb02ows associated with the Group's future lease commitments<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:588.61707px;\">for non-cancellable leases not yet commenced, representing<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:573.021px;\">principal and interest.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:234.72214px; bottom:551.8107px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _188\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:230.95502px; bottom:537.7512px;\">US$m<span class=\"_ _102\"> </span><span class=\"ff20\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:520.7375px;\">Due for payment:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:505.7127px;\">Within one y<span class=\"_ _1\"/>ear<span class=\"_ _7a\"> </span><span class=\"ff1f ls70 ws89\">67<span class=\"_ _4f\"/> <span class=\"_ _bc\"> </span></span>80<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:491.64343px;\">After one y<span class=\"_ _1\"/>ear but not more than \ufb01v<span class=\"_ _1\"/>e y<span class=\"_ _1\"/>ears<span class=\"_ _13f\"> </span><span class=\"ff1f ls6 wsa\">263 <span class=\"_ _17f\"> </span></span>159<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:477.57422px;\">Later than \ufb01v<span class=\"_ _1\"/>e years<span class=\"_ _19c\"> </span><span class=\"ff1f\">1,288 <span class=\"_ _17a\"> </span></span><span class=\"ls47 ws82\">49<span class=\"_ _2e9\"> </span></span><span class=\"ls47 ws82\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:235.86328px; bottom:463.50497px;\">1,618 <span class=\"_ _fa\"> </span><span class=\"ff20\">288<span class=\"_ _2e9\"> </span></span><span class=\"ff20\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:433.46924px;\">Payments of $162 million (2021: $68 million) for short-term<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:417.87314px;\">leases (lease term of 12 months or less) and payments of  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:402.27704px;\">$12 million (2021: $18 million) for leases of low value assets were<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:386.68094px;\">expensed in the consolidated income statement. Total payments<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:371.08484px;\">for leases in the consolidated statement of cash \ufb02ows are $525<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:355.48874px;\">million (2021: $330 million), with $258 million (2021:  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:339.89264px;\">$244 million) included in \ufb01nancing activities.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:316.92554px;\">The Group has short-term and/or low value lease commitments<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:301.32944px;\">for marine vessels and carriers, property, drill rigs and plant and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:285.73334px;\">equipment contracted for, but not provided for in the \ufb01nancial<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:270.13724px;\">statements, of $60 million (2021: $53 million).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:890.05365px;\">K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:869.4687px;\">(a) <span class=\"_ _0\"/>Control<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:856.4687px;\">Judgement is required to assess whether a contract is or contains a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:843.4687px;\">lease at inception by assessing whether the Group has the right to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:830.4687px;\">direct the use of the identi\ufb01ed asset and obtain substantially all the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:817.4687px;\">economic bene\ufb01ts from the use of that asset.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:793.1986px;\">(b) <span class=\"_ _13b\"/>Lease term<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:780.1986px;\">Judgement is required when assessing the term of the lease and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:767.1986px;\">whether to include optional extension and termination periods.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:754.1986px;\">Option periods are only included in determining the lease term <span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:741.1986px;\">at inception when they are reasonably certain to be exercised. <span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:728.1986px;\">Lease terms are reassessed when a signi\ufb01cant change in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:715.1986px;\">circumstances occurs. On this basis, possible additional lease<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:702.1986px;\">payments amounting to $2,323 million (2021: $1,654 million) <span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:689.1986px;\">were not included in the measurement of lease liabilities.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:664.9284px;\">(c) <span class=\"_ _1\"/>lnterest in joint arrangements<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:651.9284px;\">Judgement is required to determine the Group\u2019s rights and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:638.9284px;\">obligations for lease contracts within joint operations, to assess<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:625.9284px;\">whether lease liabilities are recognised gross (100%) or in proportion<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:612.9284px;\">to the Group\u2019s participating interest in the joint operation. This<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:599.9284px;\">includes an evaluation of whether the lease arrangement contains <span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:586.9284px;\">a sublease with the joint operation.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc5 ff1f fs56 fc0 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:562.65845px;\">(d) <span class=\"_ _13b\"/>Discount rates<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:549.65845px;\">Judgement is required to determine the discount rate, where the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:536.65845px;\">discount rate is the Group\u2019s incremental borrowing rate if the rate<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:523.65845px;\">implicit in the lease cannot be readily determined. The incremental<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:510.65845px;\">borrowing rate is determined with reference to the Group\u2019s<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:497.65845px;\">borrowing portfolio at the inception of the arrangement or <span class=\"ls0\"> </span></div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:354.3662px; bottom:484.65845px;\">the time of the modi\ufb01cation. </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">D<span class=\"_ _1\"/>. Other asse<span class=\"_ _1\"/>ts and liabilities<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls31 ws35\" style=\"left:651.3286px; bottom:1.4145012px;\">145<span class=\"_ _49\"/><span class=\"ff1e fc5 ls0 ws0\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h24 ff1d fs2 fc0 sc0 ls0 ws0\" style=\"bottom:927.4895px;\">In this section<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:904.5194px;\">This section addresses information on items which require disclosure to comply with Australian Accounting Standards and the </div><div class=\"t m0 h6 ff23 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:888.92334px;\">Corporations Act 2001<span class=\"ff20\">, however are not considered critical in understanding the \ufb01nancial performance or position of the Group.  </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:873.3272px;\">This section includes Group structure information and other disclosures. </div><div class=\"t m0 h3 ff1f fs1 fce sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:845.6818px;\">E. <span class=\"_ _24\"> </span>Other items<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:828.1408px;\">E.1 <span class=\"_ _1d\"> </span>Contingent liabilities and assets<span class=\"_ _20f\"> </span>Page 146<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:809.7133px;\">E.2 <span class=\"_ _29\"> </span>Employee bene\ufb01ts<span class=\"_ _275\"> </span>Page 146<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:791.28577px;\">E.3 <span class=\"_ _44\"> </span>Related party transactions<span class=\"_ _aa\"> </span>Page 149<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:772.8583px;\">E.4 <span class=\"_ _16\"> </span>Auditor remuneration<span class=\"_ _2d\"> </span>Page 149<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:754.4308px;\">E.5 <span class=\"_ _44\"> </span>Events after the end of the reporting period<span class=\"_ _a4\"> </span>Page 149<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:736.0033px;\">E.6 <span class=\"_ _16\"> </span>Joint arrangements<span class=\"_ _3c\"> </span>Page 149<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:717.5758px;\">E.7 <span class=\"_ _29\"> </span>Parent entity information<span class=\"_ _109\"> </span>Page 151<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws7f\" style=\"left:1.8680992px; bottom:699.1483px;\">E.8 Subsidiaries<span class=\"_ _28f\"> </span><span class=\"ws0\">Page 151<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:680.72076px;\">E.9 <span class=\"_ _16\"> </span>Other accounting policies<span class=\"_ _296\"> </span>Page 154<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">E. Other it<span class=\"_ _1\"/>ems<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">146<span class=\"_ _1a\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">E. Other it<span class=\"_ _1\"/>ems<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">E.<span class=\"_ _1\"/>1 <span class=\"_ _17\"> </span>C<span class=\"_ _1\"/>ontingent liabilities and assets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:230.95502px; bottom:897.40765px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _e1\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls7c ws97\" style=\"left:228.49802px; bottom:883.3384px;\">US$m<span class=\"_ _d5\"> </span><span class=\"ff20 ls0 ws0\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:860.45514px;\">Contingent liabilities at r<span class=\"_ _1\"/>eporting date<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:846.3859px;\">Contingent liabilities<span class=\"_ _2a2\"> </span><span class=\"ff1f\">161 <span class=\"_ _b1\"> </span></span>195 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:832.31665px;\">Guarant<span class=\"_ _1\"/>ees<span class=\"_ _1a9\"> </span><span class=\"ff1f\">2 <span class=\"_ _fa\"> </span></span>7 </div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:238.89554px; bottom:818.2474px;\">163 <span class=\"_ _b5\"> </span><span class=\"ff20\">202 </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:797.40985px;\">Contingent liabilities relate predominantly to possible </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:781.8137px;\">obligations whose existence will only be con\ufb01rmed by the </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:766.21765px;\">occurrence or non-occurrence of uncertain future events, and </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:750.6215px;\">therefore the Group has not provided for such amounts in these </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:735.02545px;\">\ufb01nancial statements. Additionally, there are a number of other </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:719.4293px;\">claims and possible claims that have arisen in the course of </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:703.83325px;\">business against entities in the Group, the outcome of which </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:688.2371px;\">cannot be estimated at present and for which no amounts have </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:672.64105px;\">been included in the table above.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:649.67395px;\">The Group has contingent assets of $199 million as at 31 </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:634.0778px;\">December 2022 (2021: nil).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:601.09955px;\">E.2 <span class=\"_ _1a\"> </span>Emplo<span class=\"_ _1\"/>y<span class=\"_ _1\"/>ee bene\ufb01ts<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:178.56422px; bottom:571.01746px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _dd\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _b7\"> </span>2020<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:175.57162px; bottom:556.95795px;\">US$m<span class=\"_ _c0\"> </span><span class=\"ff20\">US$m<span class=\"_ _c0\"> </span>US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:539.94415px;\">Employ<span class=\"_ _1\"/>ee bene\ufb01ts<span class=\"_ _46\"> </span><span class=\"ff1f\">415 <span class=\"_ _b8\"> </span></span>217 <span class=\"_ _fa\"> </span>252 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:523.98346px;\">Share-based pa<span class=\"_ _1\"/>yments<span class=\"_ _194\"> </span><span class=\"ff1f ls6c ws85\">26 <span class=\"_ _163\"> </span></span>12 <span class=\"_ _103\"> </span>19 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:509.91418px;\">De\ufb01ned contribution plan cos<span class=\"_ _1\"/>ts<span class=\"_ _105\"> </span><span class=\"ff1f ls70 ws89\">41 <span class=\"_ _17a\"> </span></span><span class=\"ls6c ws85\">26 <span class=\"_ _18a\"> </span><span class=\"ls47 ws82\">27<span class=\"_ _4f\"/> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:495.8449px;\">De\ufb01ned bene\ufb01t plan expense<span class=\"_ _5b\"> </span><span class=\"ff1f\">9 <span class=\"_ _ae\"> </span></span>1 <span class=\"_ _9e\"> </span>2 </div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:185.36816px; bottom:481.7854px;\">491 <span class=\"_ _188\"> </span><span class=\"ff20\">256 <span class=\"_ _dd\"> </span>300 </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:453.34338px;\">(a) Employee bene\ufb01ts </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:437.74338px;\">Employee bene\ufb01ts for the reporting period are as follows:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:409.7883px;\">Recognition and measurement </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:394.18832px;\">The Group\u2019s accounting policy for employee bene\ufb01ts other than </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:378.59222px;\">superannuation is set out in Note D.5. The policy relating to </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:362.99612px;\">share-based payments is set out in Note E.2(c). </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:340.02902px;\">All employees of the Group are entitled to bene\ufb01ts on </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:324.43292px;\">retirement, disability or death from the Group\u2019s retirement plans. </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:308.83682px;\">The Group operates a number of pension schemes throughout </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:293.24072px;\">the world. Employees entitled to de\ufb01ned contribution schemes </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:277.64462px;\">receive \ufb01xed contributions from Group companies and the </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:262.04852px;\">Group\u2019s legal or constructive obligation is limited to these </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:246.45242px;\">contributions. Contributions to de\ufb01ned contribution funds are </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:230.85632px;\">recognised as an expense as they become payable. Prepaid </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:215.26021px;\">contributions are recognised as an asset to the extent that a </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:199.66411px;\">cash refund or a reduction in the future payment is available. </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:928.0095px;\">(b) Compensation of key management </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:911.116px;\">personnel </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:895.5095px;\">Key management personnel (KMP) compensation for the </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:879.9134px;\">\ufb01nancial year was as follows:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:522.3245px; bottom:849.8274px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _95\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _b4\"> </span>2020<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:527.3599px; bottom:835.7581px;\">US$<span class=\"_ _188\"> </span><span class=\"ff20\">US$<span class=\"_ _da\"> </span>US$<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:812.8749px;\">Short-term emplo<span class=\"_ _1\"/><span class=\"_ _2e9\">yee bene\ufb01ts1</span><span class=\"_ _d7\"> </span><span class=\"ff1f\">5,730,340 <span class=\"_ _148\"> </span></span>6,626,354 <span class=\"_ _183\"> </span>5,868,4<span class=\"_ _1\"/>76 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:798.80566px;\">Post-emplo<span class=\"_ _1\"/><span class=\"_ _2e9\">yment bene\ufb01ts1</span><span class=\"_ _249\"> </span><span class=\"ff1f\">155,086 <span class=\"_ _54\"> </span></span>88,<span class=\"_ _4f\"/>396 <span class=\"_ _54\"> </span>63,805 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:784.7364px;\">Share-based pa<span class=\"_ _1\"/><span class=\"_ _2e9\">yments2</span><span class=\"_ _217\"> </span><span class=\"ff1f\">3,<span class=\"_ _1\"/>114,043 <span class=\"_ _4d\"> </span><span class=\"ff20\">5,697<span class=\"_ _2\"/>,529 <span class=\"_ _e5\"> </span>7<span class=\"_ _0\"/>,201,653 </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:770.6671px;\">Long-term emplo<span class=\"_ _1\"/>y<span class=\"_ _1\"/>ee bene\ufb01ts <span class=\"_ _9e\"> </span><span class=\"ff1f\">4,300 <span class=\"_ _54\"> </span></span>717<span class=\"_ _0\"/>,223 <span class=\"_ _db\"> </span>515,585 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:756.5979px;\">T<span class=\"_ _0\"/>ermination bene\ufb01ts<span class=\"_ _18e\"> </span><span class=\"ff1f\">152,531 <span class=\"_ _53\"> </span></span>2,44<span class=\"_ _1\"/>7<span class=\"_ _0\"/>,525 <span class=\"_ _d4\"> </span>390<span class=\"_ _1\"/>,087 </div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:503.26807px; bottom:742.5286px;\">9,<span class=\"_ _1\"/>156,300 <span class=\"_ _148\"> </span><span class=\"ff20\">15,5<span class=\"_ _1\"/>77<span class=\"_ _0\"/>,027 <span class=\"_ _22\"> </span>14,039,606 </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:729.0159px;\">1. <span class=\"_ _29\"> </span>The 2021 c<span class=\"_ _1\"/>omparativ<span class=\"_ _1\"/>es for short-term emplo<span class=\"_ _1\"/>yee bene\ufb01ts and pos<span class=\"_ _1\"/>t-employment </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:718.09595px;\">bene\ufb01ts hav<span class=\"_ _1\"/>e been restat<span class=\"_ _1\"/>ed to include the super<span class=\"_ _1\"/>annuation component of the </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:707.1759px;\">2021 EIS cash and other cash bonuses for thr<span class=\"_ _1\"/>ee ke<span class=\"_ _1\"/>y management personnel, </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:696.2559px;\">increasing the short-t<span class=\"_ _1\"/>erm employ<span class=\"_ _1\"/>ee bene\ufb01ts expense b<span class=\"_ _1\"/>y $26,67<span class=\"_ _1\"/>6 to $6,626,354 </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:685.33594px;\">and the post-emplo<span class=\"_ _1\"/>yee bene\ufb01ts e<span class=\"_ _1\"/>xpense by $10<span class=\"_ _1\"/>,881 to $88,396.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:671.7951px;\">2.  The 2021 compar<span class=\"_ _1\"/>ative for shar<span class=\"_ _1\"/>e-based payments has been r<span class=\"_ _1\"/>estated t<span class=\"_ _1\"/>o </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:660.8751px;\">include amortisation of the fair v<span class=\"_ _1\"/>alue of 2021 performance rights f<span class=\"_ _1\"/>or two k<span class=\"_ _1\"/>ey </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:355.62943px; bottom:649.95514px;\">management personnel, increasing the e<span class=\"_ _1\"/>xpense by $88,50<span class=\"_ _1\"/>7 to $5,6<span class=\"_ _1\"/>97<span class=\"_ _0\"/>,529.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:624.26935px;\">(c) Share plans </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:608.6693px;\">The Group provides bene\ufb01ts to its employees (including KMP) in </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:593.07324px;\">the form of share-based payments whereby employees render </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:577.4771px;\">services for shares (equity-settled transactions).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:549.51416px;\">Woodside equity plan (WEP) and </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:532.6206px;\">supplementary Woodside equity plan (SWEP)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:517.01416px;\">The WEP is available to all permanent employees, but since 1 </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:501.41803px;\">January 2018 has excluded Executive Incentive Scheme (EIS) </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:485.82196px;\"><span class=\"_ _2e9\">participants. The number of Equity Rights (ERs) offered to </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:470.22583px;\">each eligible employee is determined by the Board, and based </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:454.62973px;\">on individual performance as assessed under the performance </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:439.03363px;\">review process. The linking of performance to an allocation </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:423.43753px;\">allows the Group to recognise and reward eligible employees </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:407.84143px;\">for high performance. The ERs have no further ongoing </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:392.24533px;\">performance conditions after allocation, and do not require </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:376.64923px;\">participants to make any payment in respect of the ERs at grant </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:361.05313px;\">or at vesting. Each ER entitles the participant to receive  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:345.45703px;\">a Woodside share on the vesting date three years after the  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:329.86093px;\">grant date. </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:306.89383px;\">For awards made in 2022, the Board amended the terms of the </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:291.29773px;\">plan to entitle participants to receive a Woodside share on the </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:275.70163px;\">vesting date, three years after the grant date. Awards made in </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:260.10553px;\">2020 and 2021 will vest under the terms of the plan at that time, </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:244.50943px;\">which provided for 75% vesting of the ERs three years after the </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:228.91333px;\">grant date and the remaining 25% of the ERs \ufb01ve years after the </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:213.31723px;\">grant date. </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:190.35013px;\">In October 2011, the Board approved the establishment of the </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:174.75403px;\"><span class=\"_ _2e9\">SWEP to enable the offering of targeting retention awards </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:159.15793px;\">of ERs for key capability. The SWEP was updated in 2022 to </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:143.56183px;\">broaden eligibility to all employees of a subsidiary of Woodside </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:127.96573px;\">Energy Group Ltd and ensure compliance in all jurisdictions </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:112.36963px;\"><span class=\"_ _2e9\">in which Woodside operates. This facilitated the offer of </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:96.77353px;\">replacement unvested incentives, as required under transitional </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:81.17743px;\">arrangements for eligible heritage BHP employees transitioning </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:65.58133px;\">from BHP Group Long-Term Incentive (LTI) plans to VAR </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:49.98523px;\"><span class=\"_ _2e9\">offered under Woodside\u2019s VAR arrangements. </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls42 ws4a\" style=\"left:651.3286px; bottom:1.4145012px;\">147<span class=\"_ _211\"/><span class=\"ff1e fc5 ls0 ws0\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">E. Other it<span class=\"_ _1\"/>ems<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">E.2 <span class=\"_ _1a\"> </span>Emplo<span class=\"_ _1\"/>y<span class=\"_ _1\"/>ee bene\ufb01ts (<span class=\"_ _1\"/>cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">Woodside equity plan (WEP) and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:882.6409px;\">supplementary Woodside equity plan (SWEP)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:865.74744px;\">(cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:850.13446px;\">Each ER entitles the participant to receive a Woodside share or<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:834.5383px;\">an American Depositary share on the vesting date either one,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:818.94226px;\"><span class=\"_ _2e9\">two, three or four years after the effective grant date, depending<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:803.3461px;\"><span class=\"_ _2e9\">on the individual details of each SWEP offered. Participants do<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:787.75006px;\">not make any payment in respect of the ERs at grant or  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:772.15393px;\">at vesting.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:744.17926px;\">Executive Incentive Plans (EIP)<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:728.5792px;\">The EIP operated as Woodside\u2019s Executive incentive framework<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:712.98315px;\">until the end of 2017, after which the Board introduced the EIS.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:697.387px;\">The EIP was used to deliver Short-Term Awards (STAs) and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:681.79095px;\">Long-Term Awards (LTAs) to Senior Executives.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:653.82404px;\">Short-Term Awards (STAs)<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:638.22406px;\">STAs were delivered in the form of restricted shares to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:622.6279px;\">Executives, including all Executive KMP. There are no further<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:607.03186px;\">performance conditions for vesting of deferred STAs.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:591.4357px;\">Participants are not required to make any payments in respect<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:575.83966px;\">of STA awards at grant or at vesting. Restricted shares entitle<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:560.2435px;\">their holders to receive dividends.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc0 ff1d fs56 fc0 sc0 ls0 ws0\" style=\"bottom:532.269px;\">Long-Term Awards (LTAs)<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:516.669px;\">LTAs were granted in the form of Performance Rights (PRs)<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:501.07288px;\">to Executives, including all Executive KMP. Vesting of LTAs<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:485.4768px;\">is subject to achievement of relative total shareholder return<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:469.88068px;\">(RTSR) targets, with 33% measured against the ASX 50 and the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:454.28458px;\">remaining 67% tested against an international group of oil and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:438.68848px;\">gas companies. Participants are not entitled to receive dividends<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:423.09238px;\">and are not required to make any payments in respect of LTA<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:407.49628px;\">awards at grant or at vesting.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:379.51392px;\">Executive Incentive Scheme (EIS)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:363.9139px;\">The EIS was introduced for the 2018 performance year for<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:348.3178px;\">all Executives including Executive KMP. The EIS is delivered<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:332.7217px;\">in the form of a cash incentive, Restricted Shares and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:317.1256px;\">Performance Rights. The grant date of the Restricted Shares<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:301.5295px;\">and Performance Rights has been determined to be subsequent<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:285.9334px;\">to the performance year, being the date of the Board of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:270.3373px;\">Directors\u2019 approval. Accordingly, the 2021 Restricted Shares<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:254.74121px;\">and Performance Rights were granted on 16 February 2022 for<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:239.14511px;\">Executives and 19 May 2022 for the CEO and have been included<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:223.54901px;\">in the table below. The expense estimated as at 31 December<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:207.95291px;\">2021 in relation to the 2021 performance year was updated to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:192.35681px;\">the fair value on grant date during the period.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:169.38971px;\">The 2022 Restricted Shares and Performance Rights have<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:153.79361px;\">not been included in the table below as they have not been<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:138.19751px;\">approved as at 31 December 2022. An expense related to the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:122.60141px;\">2022 performance year has been estimated for the Restricted<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:107.00531px;\">Shares and Performance Rights, using fair value estimates based<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:90.11051px;\">on inputs at 31 December 2022.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:899.5344px;\">Performance Based Pay Plus (PBP Plus)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:883.93445px;\">PBP Plus is available to senior, permanent employees who<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:868.3384px;\">are not Executives. Participants receive an annual award of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:852.74225px;\">cash and Restricted Shares based on corporate and individual<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:837.1462px;\">performance, recognising and rewarding eligible employees for<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:821.55005px;\">high performance.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:798.58295px;\">The grant date of the Restricted Shares has been determined to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:782.9869px;\">be subsequent to the performance year, being the date of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:767.39075px;\">Board of Directors\u2019 approval. Accordingly, the 2021 Restricted<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:751.7947px;\">Shares were granted on 16 February 2022 and have been<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:736.19855px;\">included in the table below. The expense estimated as at 31<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:720.6025px;\">December 2021 in relation to the 2021 performance year was<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:705.00635px;\">updated to the fair value on grant date during the period.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:682.03925px;\">The 2022 Restricted Shares have not been included in the table<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:666.4432px;\">below as they have not been approved as at 31 December 2022.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:650.84705px;\">An expense related to the 2022 performance year has been<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:635.251px;\">estimated for the Restricted Shares, using fair value estimates<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:619.65485px;\">based on inputs at 31 December 2022.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:591.6391px;\">Recognition and measurement<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:576.03906px;\">All compensation under WEP, SWEP and Executive share plans<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:560.443px;\">is accounted for as share-based payments to employees for<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:544.84686px;\">services provided. The cost of equity-settled transactions with<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:529.2508px;\">employees is measured by reference to the fair values of the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:513.65466px;\">equity instruments at the date at which they are granted. The<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:498.0586px;\">fair value of share-based payments is recognised, together with<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:482.46246px;\">the corresponding increase in equity, over the period in which<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:466.86636px;\">the vesting conditions are ful\ufb01lled, ending on the date on which<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:451.27026px;\">the relevant employee becomes fully entitled to the shares. At<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:435.67416px;\">each balance sheet date, the Group reassesses the number of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:420.07806px;\">awards that are expected to vest based on service conditions.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:404.48196px;\">The expense recognised each year takes into account the most<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:388.88586px;\">recent estimate.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:365.91876px;\">The fair value of the bene\ufb01t provided for the WEP and SWEP is<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:350.32266px;\">estimated using the Black-Scholes option pricing technique.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:327.35556px;\">The fair value of the restricted shares is estimated as the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:311.75946px;\">closing share price at grant date. The fair value of the bene\ufb01t<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:296.16336px;\">provided for the RTSR PRs is calculated using the Binomial or<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:280.56726px;\">Black-Scholes option pricing technique combined with a Monte<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:264.97116px;\">Carlo simulation methodology, where relevant, using historical<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:249.37506px;\">volatility to estimate the volatility of the share price in the future.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">148<span class=\"_ _1a\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">E.2 <span class=\"_ _1a\"> </span>Emplo<span class=\"_ _1\"/>y<span class=\"_ _1\"/>ee bene\ufb01ts (<span class=\"_ _1\"/>cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:904.5194px;\">The number of awards and movements for all share plans are summarised as follows:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:413.8411px; bottom:875.17426px;\">Number of performance a<span class=\"_ _1\"/>wards<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc4 sc0 ls89 wsb0\" style=\"left:356.82153px; bottom:859.27203px;\">Employee<span class=\"_ _1\"/> plans<span class=\"_ _10a\"> </span><span class=\"ls8a wsb1\">E<span class=\"_ _4f\"/>x<span class=\"_ _1\"/>ecutiv<span class=\"_ _1\"/>e plans<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:364.84448px; bottom:843.36975px;\">WEP<span class=\"_ _263\"> </span>SWEP<span class=\"_ _7c\"> </span><span class=\"ls8b wsb2\">S<span class=\"_ _50\"/>TA</span><span class=\"_ _2e9\">4</span><span class=\"_ _86\"> </span><span class=\"ls8c wsb3\">LTA</span><span class=\"_ _2e9\">4<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:821.9393px;\">Y<span class=\"_ _0\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:807.87px;\">Opening balance<span class=\"_ _267\"> </span><span class=\"ff1f\">5,649,<span class=\"_ _1\"/>783 <span class=\"_ _101\"> </span>-<span class=\"_ _174\"> </span>994,436 <span class=\"_ _165\"> </span>2,379,220<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:793.8008px;\">Grant<span class=\"_ _1\"/>ed during the year</div><div class=\"t m0 hab ff22 fs54 fc1 sc0 ls8d wsb4\" style=\"left:99.5544px; bottom:797.0435px;\">1,2,3<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:345.46844px; bottom:793.79675px;\">3,017<span class=\"_ _2\"/>,366 <span class=\"_ _17a\"> </span>3,046,963 <span class=\"_ _8c\"> </span>495,800 <span class=\"_ _a9\"> </span>764,171<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:779.7275px;\">V<span class=\"_ _1\"/>est<span class=\"_ _1\"/>ed during the year<span class=\"_ _280\"> </span><span class=\"ff1f\">(1<span class=\"_ _4f\"/>,4<span class=\"_ _1\"/>98,065)<span class=\"_ _107\"> </span>(38,146)<span class=\"_ _7\"> </span>(450,609)<span class=\"_ _ae\"> </span>(191<span class=\"_ _4f\"/>,<span class=\"_ _1\"/>736<span class=\"_ _2e9\"> </span></span><span class=\"ff1f\">)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:765.65826px;\">Forfeit<span class=\"_ _1\"/>ed during the year<span class=\"_ _d\"> </span><span class=\"ff1f\">(539,403)<span class=\"_ _13f\"> </span>(124,7<span class=\"_ _0\"/>41)<span class=\"_ _13f\"> </span>(46,<span class=\"_ _1\"/>430)<span class=\"_ _9e\"> </span>(397<span class=\"_ _0\"/>,233)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:748.6445px;\">A<span class=\"_ _1\"/>wards a<span class=\"_ _1\"/>t 31 December 2022<span class=\"_ _2a3\"> </span><span class=\"fc1\">6,629,681 <span class=\"_ _18a\"> </span>2,884,0<span class=\"_ _1\"/>76 <span class=\"_ _a2\"> </span>993,<span class=\"_ _1\"/>197 <span class=\"_ _5\"> </span>2,554,422<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:359.57117px; bottom:715.9722px;\">US$m<span class=\"_ _6b\"> </span>US$m<span class=\"_ _63\"> </span>US$m<span class=\"_ _6b\"> </span>US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:698.9585px;\">Fair v<span class=\"_ _1\"/>alue of aw<span class=\"_ _1\"/>ards grant<span class=\"_ _1\"/>ed during the year<span class=\"_ _d3\"> </span><span class=\"fc1 ls6b ws84\">49 <span class=\"_ _82\"> </span></span><span class=\"fc1\">60 <span class=\"_ _ca\"> </span>9 <span class=\"_ _ce\"> </span>13<span class=\"_ _2e9\"> </span></span><span class=\"fc1\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:413.8411px; bottom:685.63025px;\">Number of performance a<span class=\"_ _1\"/>wards<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc4 sc0 ls89 wsb0\" style=\"left:356.82153px; bottom:669.72797px;\">Employee<span class=\"_ _1\"/> plans<span class=\"_ _10a\"> </span><span class=\"ls8a wsb1\">E<span class=\"_ _4f\"/>x<span class=\"_ _1\"/>ecutiv<span class=\"_ _1\"/>e plans<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:364.84448px; bottom:653.82574px;\">WEP<span class=\"_ _263\"> </span>SWEP<span class=\"_ _7c\"> </span><span class=\"ls8b wsb2\">S<span class=\"_ _50\"/>TA</span><span class=\"_ _2e9\">4</span><span class=\"_ _86\"> </span><span class=\"ls8c wsb3\">LTA</span><span class=\"_ _2e9\">4<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:632.39526px;\">Y<span class=\"_ _0\"/>ear ended 31 December 2021<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:617.4095px;\">Opening balance<span class=\"_ _21e\"> </span>5,6<span class=\"_ _1\"/>18,603 <span class=\"_ _d0\"> </span>-<span class=\"_ _61\"> </span>975,295 <span class=\"_ _210\"> </span>2,798,305<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:603.3402px;\">Grant<span class=\"_ _1\"/>ed during the year</div><div class=\"t m0 hab ff22 fs54 fc1 sc0 ls8d wsb4\" style=\"left:99.5544px; bottom:606.58594px;\">1,2,3<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:349.54126px; bottom:603.3392px;\">2,507<span class=\"_ _2\"/>,16<span class=\"_ _1\"/>7 <span class=\"_ _d0\"> </span>-<span class=\"_ _a7\"> </span>353,412 <span class=\"_ _174\"> </span>553,849<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:589.26996px;\">V<span class=\"_ _1\"/>est<span class=\"_ _1\"/>ed during the year<span class=\"_ _156\"> </span>(1,999,676)<span class=\"_ _14b\"> </span>-<span class=\"_ _14a\"> </span>(307<span class=\"_ _2\"/>,402)<span class=\"_ _140\"> </span>(322,7<span class=\"_ _0\"/>46)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:575.21045px;\">Forfeit<span class=\"_ _1\"/>ed during the year<span class=\"_ _2a4\"> </span>(4<span class=\"_ _1\"/>76,311)<span class=\"_ _14b\"> </span>-<span class=\"_ _9f\"> </span>(26,869)<span class=\"_ _ae\"> </span>(650,<span class=\"_ _1\"/>188)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:561.1412px;\">A<span class=\"_ _1\"/>war<span class=\"_ _1\"/>ds at 31 December 2021<span class=\"_ _15c\"> </span>5,649,<span class=\"_ _1\"/>783 <span class=\"_ _d0\"> </span>-<span class=\"_ _5d\"> </span>994,436 <span class=\"_ _160\"> </span>2,379,220<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:359.57117px; bottom:533.01245px;\">US$m<span class=\"_ _6b\"> </span>US$m<span class=\"_ _63\"> </span>US$m<span class=\"_ _6b\"> </span>US$m<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:515.9987px;\">Fair v<span class=\"_ _1\"/>alue of aw<span class=\"_ _1\"/>ards gr<span class=\"_ _1\"/>anted during the y<span class=\"_ _1\"/>ear<span class=\"_ _2a5\"> </span><span class=\"ls6a ws83\">39 <span class=\"_ _d0\"> </span></span>-<span class=\"_ _18e\"> </span>7 <span class=\"_ _14b\"> </span>9<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:502.45996px;\">1. <span class=\"_ _29\"> </span>For the purpose of v<span class=\"_ _1\"/>aluation, the share price on gr<span class=\"_ _1\"/>ant date f<span class=\"_ _1\"/>or the 2022 WEP allocations was $16.30 (2021: $<span class=\"_ _1\"/>15.17).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:488.9192px;\">2.  For the purpose of valuation, the shar<span class=\"_ _1\"/>e price on grant da<span class=\"_ _1\"/>te for the 2022 S<span class=\"_ _1\"/>WEP allocations was $19<span class=\"_ _1\"/>.7<span class=\"_ _0\"/>4 (2021: nil).  </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:475.3784px;\">3.  For the purpose of valuation, the shar<span class=\"_ _1\"/>e price on gr<span class=\"_ _1\"/>ant date for Res<span class=\"_ _1\"/>tricted Shares w<span class=\"_ _1\"/>as $19.20 and $19.27 (20<span class=\"_ _1\"/>21: $20.<span class=\"_ _1\"/>18) and Performance Rights w<span class=\"_ _1\"/>as $13.08 and $13.<span class=\"_ _1\"/>71<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:464.45837px;\">(2021: $11.66 and $14.44).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:450.91757px;\">4.  Includes a<span class=\"_ _1\"/>war<span class=\"_ _1\"/>ds issued under EIP and EIS.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:422.40988px;\">For more detail on these share plans and performance rights issued to KMPs, refer to the Remuneration Report.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">E. Other it<span class=\"_ _1\"/>ems<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls44 ws4e\" style=\"left:651.3286px; bottom:1.4145012px;\">149<span class=\"_ _49\"/><span class=\"ff1e fc5 ls0 ws0\">Woodside Ener<span class=\"_ _1\"/>gy Group L<span class=\"_ _1\"/>td      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">E.3 <span class=\"_ _1a\"> </span>Relat<span class=\"_ _1\"/>ed party tr<span class=\"_ _1\"/>ansactions<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:904.5194px;\">The Group\u2019s related party transactions are predominantly  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:888.92334px;\">with associates of the Group. During the period, the transactions </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:873.3272px;\">with related parties include purchases of goods/services of </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:857.73114px;\">$60.730 million, sale of goods/services of $18.527 million and </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:842.135px;\">dividend income of $8.294 million. As at 31 December 2022, </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:826.53894px;\">the total amounts owing to related parties is $1.686 million </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:810.9428px;\">and amounts owing from related parties is $2.200 million. All </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:795.34674px;\">transactions to/from related parties are made at arm\u2019s length </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:779.7506px;\">(normal market rates and on normal commercial terms). </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:756.7835px;\">There were no transactions with directors during the year.  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:741.18744px;\">Key management personnel compensation is disclosed in  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:725.5913px;\">Note E.2(b).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:692.6093px;\">E.4 <span class=\"_ _56\"> </span>Auditor r<span class=\"_ _1\"/>emunera<span class=\"_ _1\"/>tion<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:669.6392px;\">For the year ended 31 December 2022, the auditor of Woodside </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:654.0431px;\">Energy Group Ltd is PricewaterhouseCoopers Australia (PwC) </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:638.447px;\">(2021 and 2020: Ernst &amp; Young (EY)).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:185.36816px; bottom:607.68146px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _47\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _c0\"> </span>2020<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:171.45116px; bottom:592.93945px;\">US$000<span class=\"_ _e2\"> </span><span class=\"ff20\">US$000<span class=\"_ _e2\"> </span>US$000<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:575.9257px;\">(a) Auditors of the Gr<span class=\"_ _1\"/>oup<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:561.85645px;\">Amounts receiv<span class=\"_ _1\"/>ed or due and </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:552.10645px;\">receiv<span class=\"_ _1\"/>able to:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:537.36444px;\">Pricew<span class=\"_ _1\"/>aterhouseC<span class=\"_ _1\"/>oopers (Austr<span class=\"_ _1\"/>alia)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:522.62244px;\">Audit and re<span class=\"_ _1\"/>vie<span class=\"_ _1\"/>w of \ufb01nancial reports<span class=\"_ _b6\"> </span><span class=\"ff1f\"> 2,8<span class=\"_ _1\"/>78 <span class=\"_ _5\"> </span><span class=\"ff20\"> - <span class=\"_ _165\"> </span> - </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:507.88043px;\">Assuranc<span class=\"_ _1\"/>e services <span class=\"_ _66\"> </span><span class=\"ff1f\"> 129 <span class=\"_ _18a\"> </span></span> - <span class=\"_ _165\"> </span> - </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:493.81122px;\">Other assuranc<span class=\"_ _1\"/>e and agreed upon </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:484.06122px;\">proc<span class=\"_ _1\"/>edures services<span class=\"_ _252\"> </span><span class=\"ff1f\"> 832 <span class=\"_ _5\"> </span></span> - <span class=\"_ _165\"> </span> - </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:469.3192px;\">T<span class=\"_ _0\"/>ax services<span class=\"_ _e6\"> </span><span class=\"ff1f\"> - <span class=\"_ _165\"> </span></span> - <span class=\"_ _5\"> </span> - </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:454.5772px;\">Other services<span class=\"_ _100\"> </span><span class=\"ff1f ls70 ws89\"> 41<span class=\"_ _4f\"/> <span class=\"_ _18a\"> </span></span> - <span class=\"_ _165\"> </span> - </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:425.7757px;\">Other ov<span class=\"_ _1\"/>erseas member \ufb01rms of </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:416.0257px;\">Pricew<span class=\"_ _1\"/>aterhouseC<span class=\"_ _1\"/>oopers (Austr<span class=\"_ _1\"/>alia)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:401.95645px;\">Audit of the \ufb01nancial reports of </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:392.20645px;\">contr<span class=\"_ _1\"/>olled entities<span class=\"_ _46\"> </span><span class=\"ff1f ls83 ws9f\"> 1<span class=\"_ _4f\"/>,<span class=\"_ _4f\"/>2<span class=\"_ _4f\"/>74<span class=\"_ _50\"/> <span class=\"_ _5\"> </span></span> - <span class=\"_ _165\"> </span> - </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:378.14697px;\">Other assuranc<span class=\"_ _1\"/>e and agreed upon </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:368.39697px;\">proc<span class=\"_ _1\"/>edures services<span class=\"_ _26\"> </span><span class=\"ff1f\"> - <span class=\"_ _165\"> </span></span> - <span class=\"_ _5\"> </span> - </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:353.65497px;\">T<span class=\"_ _0\"/>ax services<span class=\"_ _2a6\"> </span><span class=\"ff1f\"> 258 <span class=\"_ _5\"> </span></span> - <span class=\"_ _165\"> </span> - </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:338.91296px;\">Other services<span class=\"_ _19c\"> </span><span class=\"ff1f\"> - <span class=\"_ _5\"> </span></span> - <span class=\"_ _165\"> </span> - </div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:183.01842px; bottom:324.17096px;\"> 5,412 <span class=\"_ _18a\"> </span><span class=\"ff20\"> - <span class=\"_ _165\"> </span> - </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:310.11145px;\">(b) Other audit<span class=\"_ _1\"/>ors and their related </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:300.36145px;\">network \ufb01rms<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:285.61945px;\">Ernst &amp; Y<span class=\"_ _0\"/>oung<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:270.87747px;\">Audit and re<span class=\"_ _1\"/>vie<span class=\"_ _1\"/>w of \ufb01nancial reports<span class=\"_ _17f\"> </span><span class=\"ff1f\"> 48 <span class=\"_ _e3\"> </span></span> 1,732 <span class=\"_ _e1\"> </span> 1,686 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:256.13547px;\">Assuranc<span class=\"_ _1\"/>e services <span class=\"_ _1a5\"> </span><span class=\"ff1f\"> 611 <span class=\"_ _c6\"> </span></span> 2,687 <span class=\"_ _165\"> </span> - </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:242.07596px;\">Other assuranc<span class=\"_ _1\"/>e and agreed upon </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:232.32596px;\">proc<span class=\"_ _1\"/>edures services<span class=\"_ _57\"> </span><span class=\"ff1f\"> 2,335 <span class=\"_ _188\"> </span></span> 33 <span class=\"_ _b4\"> </span> 140 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:218.25671px;\">T<span class=\"_ _0\"/>ax services<span class=\"_ _e6\"> </span><span class=\"ff1f\"> - <span class=\"_ _176\"> </span></span> 129 <span class=\"_ _15e\"> </span> 178 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:204.18745px;\">Other services<span class=\"_ _19c\"> </span><span class=\"ff1f\"> - <span class=\"_ _189\"> </span></span> 19 <span class=\"_ _165\"> </span> - </div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:180.22005px; bottom:190.11821px;\"> 2,994 <span class=\"_ _f6\"> </span><span class=\"ff20\"> 4,600 <span class=\"_ _54\"> </span> 2,<span class=\"_ _1\"/>004</span><span class=\"ff20\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"left:342.73032px; bottom:927.4895px;\">E.5 <span class=\"_ _1a\"> </span>Ev<span class=\"_ _0\"/>ents after the end of the reporting<span class=\"_ _1\"/> </div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 wsb5\" style=\"left:342.73032px; bottom:909.2843px;\">period<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:886.31946px;\">The Group has undertaken a review of the depreciation </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:870.7233px;\">methodology and asset useful lives for oil and gas properties </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:855.12726px;\">in accordance with its accounting policies and the accounting </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:839.5311px;\">standards, considering the scale and diversity of the post-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:823.93506px;\">merger portfolio and to ensure alignment with common industry </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:808.3389px;\">practice.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:785.3718px;\">In assessing useful lives of certain oil and gas assets, these have </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:769.77576px;\">been approximated by reference to either their proved (1P) or </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:754.1796px;\">proved plus probable (2P) reserves, which is then used in the </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:738.58356px;\">units of production depreciation calculation.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:715.61646px;\">From 1 January 2023, upstream oil and conventional gas assets </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:700.0203px;\">will be depreciated over proved reserves (previously proved </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:684.42426px;\">plus probable, except for certain assets considered late life). </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:668.8281px;\">Upstream LNG assets will continue to be depreciated over </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:653.23206px;\">proved plus probable reserves. Multiproduct assets are assessed </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:637.6359px;\">on a case-by-case basis and aligned to the most appropriate </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:622.03986px;\">representation of useful life.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:599.07275px;\">The indicative impact to depreciation expense in 2023 resulting </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:583.4766px;\">from the change in estimate is expected to be an increase of </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:567.88055px;\">approximately $600 million. This is an indicative amount and </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:552.2844px;\">is based on current forecasts which are subject to assumptions </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:536.68835px;\">and uncertainties.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"left:342.73032px; bottom:503.66913px;\">E.6 <span class=\"_ _1d\"> </span>Joint arr<span class=\"_ _1\"/>angements<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:475.71405px;\">(a) Interest percentage in joint ventures<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:584.2656px; bottom:453.73898px;\">Group Inter<span class=\"_ _1\"/>est %<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:437.83673px;\">Entity <span class=\"_ _89\"> </span>Principal activity<span class=\"_ _10b\"> </span><span class=\"fc1\">2022<span class=\"_ _f6\"> </span><span class=\"ff20\">2021<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:375.01746px;\">North W<span class=\"_ _1\"/>est Shelf Gas Pty </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls70 ws89\" style=\"left:343.75836px; bottom:365.26746px;\">Ltd<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:423.76746px;\">Contr<span class=\"_ _1\"/>act administration </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:414.01746px;\">services for v<span class=\"_ _1\"/>enturer<span class=\"_ _1\"/>s </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:404.26746px;\">for LNG sales to </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:394.51746px;\">Japan. Marketing and </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:384.76746px;\">administra<span class=\"_ _1\"/>tion services </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:375.01746px;\">for v<span class=\"_ _1\"/>enturers for gas </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:365.26746px;\">proc<span class=\"_ _1\"/>essing. <span class=\"_ _172\"> </span><span class=\"ff1f\"> 33.33 <span class=\"_ _f9\"> </span></span> 16.67 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:337.54822px;\">North W<span class=\"_ _1\"/>est Shelf Liaison </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:327.79822px;\">Company Pty Lt<span class=\"_ _1\"/>d<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:347.29822px;\">Liaison for v<span class=\"_ _1\"/>enturers in the </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:337.54822px;\">sale of LNG to the Japanese </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:327.79822px;\">market.<span class=\"_ _cf\"> </span><span class=\"ff1f\"> 33.33 <span class=\"_ _af\"> </span></span> 16.67 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:300.0887px;\">China Administr<span class=\"_ _1\"/>ation </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:290.3387px;\">Company Pty Lt<span class=\"_ _1\"/>d<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:309.8387px;\">Contr<span class=\"_ _1\"/>act administration </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:300.0887px;\">services for v<span class=\"_ _1\"/>enturer<span class=\"_ _1\"/>s for </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:290.3387px;\">LNG sales to China.<span class=\"_ _a8\"> </span><span class=\"ff1f\"> 33.33 <span class=\"_ _f9\"> </span></span> 16.67 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:274.31946px;\">North W<span class=\"_ _1\"/>est Shelf Shipping </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:264.56946px;\">Service Compan<span class=\"_ _1\"/>y Pty Ltd<span class=\"_ _148\"> </span>LNG vessel \ufb02eet advisor<span class=\"_ _0\"/>.<span class=\"_ _f5\"> </span><span class=\"ff1f\"> 33.33 <span class=\"_ _f9\"> </span></span> 16.67 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:240.75021px;\">North W<span class=\"_ _1\"/>est Shelf Lifting </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:231.00021px;\">Coordina<span class=\"_ _1\"/>tor Pty Ltd<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:250.50021px;\">Allocating, scheduling and </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:240.75021px;\">administering the lifting of </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:461.62048px; bottom:231.00021px;\">LNG and pipeline gas. <span class=\"_ _47\"> </span><span class=\"ff1f\"> 33.33 <span class=\"_ _af\"> </span></span> 16.67<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">E. Other it<span class=\"_ _1\"/>ems<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"bottom:1.4145012px;\">150<span class=\"_ _1a\"> </span><span class=\"ff21 fc5\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">E.6 <span class=\"_ _1d\"> </span>Joint arr<span class=\"_ _1\"/>angement (<span class=\"_ _1\"/>cont.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">(b) Interest percentage in joint operations<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:219.65631px; bottom:877.55927px;\">Group Inter<span class=\"_ _1\"/>est %<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:228.49802px; bottom:858.70276px;\">2022<span class=\"_ _165\"> </span><span class=\"ff20\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:841.689px;\">Producing and de<span class=\"_ _1\"/>veloping assets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:826.947px;\">Austr<span class=\"_ _1\"/>alia<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:812.205px;\">North W<span class=\"_ _1\"/><span class=\"_ _2e9\">est Shelf1</span><span class=\"_ _26\"> </span><span class=\"ff1f\"> 25.0 - 66.7 <span class=\"_ _af\"> </span></span> 12.5 - 50.0<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:797.463px;\">Great<span class=\"_ _1\"/>er En\ufb01eld and Vincent<span class=\"_ _27c\"> </span><span class=\"ff1f ls1c ws22\"> 60.0<span class=\"_ _4f\"/> <span class=\"_ _ba\"> </span></span><span class=\"ls6e ws87\"> 60.0<span class=\"_ _2e9\"> </span></span><span class=\"ls6e ws87\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:782.721px;\">Stybarro<span class=\"_ _1\"/><span class=\"_ _2e9\">w2</span><span class=\"_ _39\"> </span><span class=\"ff1f\"> - <span class=\"_ _ba\"> </span></span><span class=\"ls6e ws87\"> 5<span class=\"_ _4f\"/>0.0<span class=\"_ _2e9\"> </span></span><span class=\"ls6e ws87\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:767.979px;\">Balnav<span class=\"_ _1\"/>es<span class=\"_ _10c\"> </span><span class=\"ff1f\"> 65.0 <span class=\"_ _b8\"> </span></span> 65.0<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:753.237px;\">Pluto<span class=\"_ _203\"> </span><span class=\"ff1f ls1c ws22\"> 90.0<span class=\"_ _4f\"/> <span class=\"_ _ba\"> </span></span><span class=\"ls6e ws87\"> 90.0<span class=\"_ _4f\"/> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:738.495px;\">Wheatstone<span class=\"_ _168\"> </span><span class=\"ff1f\"> 13.0 - 65.0 <span class=\"_ _f9\"> </span></span> 13.0 - 65.<span class=\"_ _1\"/>0<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:723.753px;\"><span class=\"_ _2e9\">Scarborough2</span><span class=\"_ _3c\"> </span><span class=\"ff1f\"> - <span class=\"_ _b9\"> </span></span> 73.5<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:709.011px;\"><span class=\"_ _2e9\">Bass Strait1</span><span class=\"_ _59\"> </span><span class=\"ff1f\"> 25.0 - 50.<span class=\"_ _1\"/>0 <span class=\"_ _5d\"> </span><span class=\"ff20\"> -<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:694.269px;\"><span class=\"_ _2e9\">Macedon1</span><span class=\"_ _15a\"> </span><span class=\"ff1f ls2b ws32\"> 71.4 <span class=\"_ _a4\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:679.527px;\"><span class=\"_ _2e9\">Pyrenees1</span><span class=\"_ _77\"> </span><span class=\"ff1f\"> 40.0 - 71.4 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:664.785px;\"><span class=\"_ _2e9\">Griffin1</span><span class=\"_ _159\"> </span><span class=\"ff1f\"> 45.0 - 71.0 <span class=\"_ _ab\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:650.043px;\"><span class=\"_ _2e9\">Minerva1</span><span class=\"_ _285\"> </span><span class=\"ff1f ls1c ws22\"> 90.0<span class=\"_ _4f\"/> <span class=\"_ _ab\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:635.301px;\">International<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:620.559px;\">Sangomar <span class=\"_ _24d\"> </span><span class=\"ff1f\"> 82.0 <span class=\"_ _c7\"> </span></span> 82.0<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:605.817px;\"><span class=\"_ _2e9\">Atlantis1</span><span class=\"_ _24e\"> </span><span class=\"ff1f\"> 44.<span class=\"_ _1\"/>0 <span class=\"_ _5d\"> </span><span class=\"ff20\"> -<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:591.075px;\"><span class=\"_ _2e9\">Mad Dog1</span><span class=\"_ _1ad\"> </span><span class=\"ff1f\"> 23.9 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:576.333px;\"><span class=\"_ _2e9\">Shenzi1</span><span class=\"_ _29e\"> </span><span class=\"ff1f\"> 72.0 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:561.591px;\">T<span class=\"_ _0\"/><span class=\"_ _2e9\">rion1</span><span class=\"_ _2a7\"> </span><span class=\"ff1f ls1c ws22\"> 60.0 <span class=\"_ _a4\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:546.849px;\">Great<span class=\"_ _1\"/><span class=\"_ _2e9\">er Angostura1</span><span class=\"_ _1a5\"> </span><span class=\"ff1f\"> 45.0 - 68.5 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:532.107px;\"><span class=\"_ _2e9\">Calypso1</span><span class=\"_ _108\"> </span><span class=\"ff1f ls1c ws22\"> 70.0 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:507.1275px;\">Exploration and e<span class=\"_ _1\"/>valuation as<span class=\"_ _1\"/>sets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:492.3855px;\">Oceania<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:477.6435px;\">Bro<span class=\"_ _1\"/>wse Basin<span class=\"_ _37\"> </span><span class=\"ff1f\"> 30.6 <span class=\"_ _b8\"> </span></span> 30.6<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:462.9015px;\"><span class=\"_ _2e9\">Carnarvon Basin3</span><span class=\"_ _88\"> </span><span class=\"ff1f\"> 31.6 - 70.<span class=\"_ _1\"/>0 <span class=\"_ _af\"> </span><span class=\"ff20\"> 15.8 - 70.0<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:448.1595px;\">Scarborough</div><div class=\"t m0 hab ff22 fs54 fc1 sc0 ls0 ws0\" style=\"left:63.798927px; bottom:451.4597px;\">2,3</div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:243.87689px; bottom:448.21292px;\"> - <span class=\"_ _164\"> </span><span class=\"ff20 ls6e ws87\"> 50.0<span class=\"_ _4f\"/> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:433.47092px;\">Bonaparte Basin<span class=\"_ _18d\"> </span><span class=\"ff1f\"> 26.7 - 35.0 <span class=\"_ _c1\"> </span></span> 26.7 - 35.0<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:419.40167px;\">Africa<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:404.65967px;\"><span class=\"_ _2e9\">Congo4</span><span class=\"_ _29e\"> </span><span class=\"ff1f\"> 22.5 <span class=\"_ _17f\"> </span></span> 42.5<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:389.9177px;\">Senegal<span class=\"_ _5c\"> </span><span class=\"ff1f ls1c ws22\"> 90.0 <span class=\"_ _ba\"> </span></span><span class=\"ls6e ws87\"> 9<span class=\"_ _4f\"/>0.0<span class=\"_ _2e9\"> </span></span><span class=\"ls6e ws87\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:375.1757px;\"><span class=\"_ _2e9\">Egypt1</span><span class=\"_ _213\"> </span><span class=\"ff1f\"> 25.0 - 45.0 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:360.4337px;\">Americas<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:345.69168px;\">US Gulf of Mexic<span class=\"_ _1\"/><span class=\"_ _2e9\">o1</span><span class=\"_ _34\"> </span><span class=\"ff1f\"> 23.9 - 75.0 <span class=\"_ _ab\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:330.94968px;\">Kitimat<span class=\"_ _7b\"> </span><span class=\"ff1f ls1c ws22\"> 50.0 <span class=\"_ _b8\"> </span></span><span class=\"ls6e ws87\"> 50.0<span class=\"_ _4f\"/> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:316.20767px;\">Asia<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:301.46567px;\">Republic of K<span class=\"_ _1\"/>orea<span class=\"_ _40\"> </span><span class=\"ff1f ls1c ws22\"> 50.0 <span class=\"_ _b8\"> </span></span><span class=\"ls6e ws87\"> 50.0<span class=\"_ _4f\"/> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:286.7237px;\"><span class=\"_ _2e9\">Myanmar5</span><span class=\"_ _64\"> </span><span class=\"ff1f\"> 40.0 - 45.0 <span class=\"_ _184\"> </span></span> 40.0 - 50.<span class=\"_ _1\"/>0<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:271.9817px;\">Caribbean<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:257.2397px;\"><span class=\"_ _2e9\">Barbados1</span><span class=\"_ _24f\"> </span><span class=\"ff1f ls1c ws22\"> 6<span class=\"_ _4f\"/>0.0 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:242.49768px;\">T<span class=\"_ _0\"/>rinidad &amp; T<span class=\"_ _0\"/><span class=\"_ _2e9\">obago1</span><span class=\"_ _6c\"> </span><span class=\"ff1f\"> 65.0 - 70.<span class=\"_ _1\"/>0 <span class=\"_ _5d\"> </span><span class=\"ff20\"> -<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:217.51817px;\">Other joint operations<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:202.77618px;\"><span class=\"_ _2e9\">Angel6</span><span class=\"_ _157\"> </span><span class=\"ff1f ls1c ws22\"> 20.0 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:188.03418px;\"><span class=\"_ _2e9\">Bonaparte Basin6</span><span class=\"_ _109\"> </span><span class=\"ff1f\"> 21.0 <span class=\"_ _ab\"> </span></span> -<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:173.33105px;\">1. <span class=\"_ _29\"> </span>Increase in int<span class=\"_ _1\"/>erests due t<span class=\"_ _1\"/>o the merger with BHPP on 1 June 2022.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:159.79025px;\">2.  No longer recognised as joint oper<span class=\"_ _1\"/>ations as the Group\u2019<span class=\"_ _1\"/>s interes<span class=\"_ _1\"/>t increased to<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:148.87025px;\">100% due to the mer<span class=\"_ _1\"/>ger with BHPP on 1 June 2022.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:135.32945px;\">3.  The Carnarvon Basin and Scarbor<span class=\"_ _1\"/>ough explor<span class=\"_ _1\"/>ation and ev<span class=\"_ _1\"/>aluation assets which<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:124.409454px;\">wer<span class=\"_ _1\"/>e pre<span class=\"_ _1\"/>viously present<span class=\"_ _1\"/>ed on the same line, hav<span class=\"_ _1\"/>e been separat<span class=\"_ _1\"/>ely presented in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:113.489456px;\">2022. The 2021 Gr<span class=\"_ _1\"/>oup inter<span class=\"_ _1\"/>ests hav<span class=\"_ _1\"/>e been reclas<span class=\"_ _1\"/>si\ufb01ed to be present<span class=\"_ _1\"/>ed on the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:102.56944px;\">same basis.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:89.02865px;\">4.  T<span class=\"_ _1\"/>he Group\u2019<span class=\"_ _1\"/>s interes<span class=\"_ _1\"/>t decreased to 22.5% upon f<span class=\"_ _1\"/>arm-down of int<span class=\"_ _1\"/>erest in June<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:78.10865px;\">2022.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:63.366653px;\">5.  The Group r<span class=\"_ _1\"/>elinquished permits AD-1 and AD-8 in 20<span class=\"_ _1\"/>22. Formalities are pending.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:49.82585px;\">6.  Carbon Captur<span class=\"_ _1\"/>e Stor<span class=\"_ _1\"/>age titles G-10-<span class=\"_ _1\"/>AP and G-<span class=\"_ _1\"/>7<span class=\"_ _1\"/>-AP gr<span class=\"_ _1\"/>anted t<span class=\"_ _1\"/>o the Group in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:12.6877365px; bottom:38.905853px;\">2022.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:903.3402px;\">The principal activities of the joint operations are exploration,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:887.7441px;\">development and production of hydrocarbons.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:356.82153px; bottom:843.1801px;\">K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hc5 ff1f fs56 fce sc0 ls0 ws0\" style=\"left:356.82153px; bottom:822.595px;\">Ac<span class=\"_ _1\"/>counting for int<span class=\"_ _1\"/>eres<span class=\"_ _1\"/>ts in other entities<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:809.595px;\">Judgement is required in assessing the level of control obtained in a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:796.595px;\">transaction to acquire an interest in another entity; depending upon<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:783.595px;\">the facts and circumstances in each case, Woodside may obtain<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:770.595px;\">control, joint control or signi\ufb01cant in\ufb02uence over the entity or<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:757.595px;\">arrangement. Judgement is applied when determining the relevant<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:744.595px;\">activities of a project and if joint control is held over it.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:724.2214px;\">Relevant activities include, but are not limited to, work program<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:711.2214px;\">and budget approval, investment decision approval, voting rights in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:698.2214px;\">joint operating committees, amendments to permits and changes<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:685.2214px;\">to joint arrangement participant holdings. Transactions which<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:672.2214px;\">give Woodside control of a business are business combinations.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:659.2214px;\">If Woodside obtains joint control of an arrangement, judgement<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:646.2214px;\">is also required to assess whether the arrangement is a joint<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:633.2214px;\">operation or a joint venture. If Woodside has neither control nor<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:620.2214px;\">joint control, it may be in a position to exercise signi\ufb01cant in\ufb02uence<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h7 ff20 fs4 fc1 sc0 ls1a ws0\" style=\"left:356.82153px; bottom:607.2214px;\">over the entity, which is then accounted for as an associate.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:560.84467px;\">Recognition and measurement<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:545.2447px;\">Joint arrangements are arrangements in which two or more<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:529.64856px;\">parties have joint control. Joint control is the contractual agreed<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:514.0525px;\">sharing of control of the arrangement which exists only when<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:498.45636px;\">decisions about the relevant activities require unanimous<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:482.8603px;\">consent of the parties sharing control. Joint arrangements are<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:467.26416px;\">classi\ufb01ed as either a joint operation or joint venture, based<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:451.66806px;\">on the rights and obligations arising from the contractual<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:436.07196px;\">obligations between the parties to the arrangement.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:413.10486px;\">To the extent the joint arrangement provides the Group with<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:397.50876px;\">rights to the individual assets and obligations arising from<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:381.91266px;\">the joint arrangement, the arrangement is classi\ufb01ed as a joint<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:366.31656px;\">operation, and as such the Group recognises its:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:343.34946px;\">\u2022 <span class=\"_ _4b\"> </span>assets, including its share of any assets held jointly;<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:324.06787px;\">\u2022 <span class=\"_ _4b\"> </span>liabilities, including its share of any liabilities incurred jointly;<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:304.78625px;\">\u2022 <span class=\"_ _4b\"> </span>revenue from the sale of its share of the output arising from  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:289.19016px;\">the joint operation;<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:269.90857px;\">\u2022 <span class=\"_ _4b\"> </span>share of revenue from the sale of the output by the joint<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:254.31247px;\">operation; and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:235.03088px;\">\u2022 <span class=\"_ _4b\"> </span>expenses, including its share of any expenses incurred jointly.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:215.74927px;\">To the extent the joint arrangement provides the Group with<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:200.15317px;\">rights to the net assets of the arrangement, the investment  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:184.55707px;\">is classi\ufb01ed as a joint venture and accounted for using the  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:168.96097px;\">equity method.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:145.99387px;\">Joint arrangements acquired which are deemed to be carrying  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:130.39777px;\">on a business are accounted for applying the principles of  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:114.80167px;\">AASB 3/ IFRS 3 <span class=\"ff23\">Business Combinations</span>. Joint arrangements<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:99.20557px;\">which are not deemed to be carrying on a business are treated<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:83.60947px;\">as asset acquisitions. </div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">E. Other it<span class=\"_ _1\"/>ems<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls0 ws0\" style=\"left:653.27094px; bottom:1.4145012px;\">151<span class=\"_ _49\"/><span class=\"ff1e fc5\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">E.7 <span class=\"_ _1a\"> </span>Par<span class=\"_ _1\"/>ent entity information<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:234.72214px; bottom:894.45953px;\">2022<span class=\"_ _da\"> </span><span class=\"ff20\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:230.95502px; bottom:880.322px;\">US$m<span class=\"_ _102\"> </span><span class=\"ff20\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:866.25275px;\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:852.18353px;\">Current asse<span class=\"_ _1\"/>ts<span class=\"_ _24e\"> </span><span class=\"ff1f\">312 <span class=\"_ _da\"> </span></span>456 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:838.11426px;\">Non-current asse<span class=\"_ _1\"/>ts<span class=\"_ _10e\"> </span><span class=\"ff1f\">34,7<span class=\"_ _1\"/>34 <span class=\"_ _e3\"> </span><span class=\"ff20 ls6e ws87\">10,037 </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:824.045px;\">Current liabilities<span class=\"_ _28e\"> </span><span class=\"ff1f\">(1,530)<span class=\"_ _bb\"> </span></span>(357)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:809.97577px;\">Non-current liabilities<span class=\"_ _10e\"> </span><span class=\"ff1f\">(481)<span class=\"_ _f4\"> </span></span>(300)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:792.96204px;\">Net assets<span class=\"_ _108\"> </span><span class=\"fc1\">33,035 <span class=\"_ _bf\"> </span><span class=\"ff20\">9,836 </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:778.9025px;\">Issued and fully paid shares<span class=\"_ _8b\"> </span><span class=\"ff1f\">29,001 <span class=\"_ _b1\"> </span></span>9,409 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:764.83325px;\">Reserv<span class=\"_ _1\"/>ed shares<span class=\"_ _2e\"> </span><span class=\"ff1f\">(38)<span class=\"_ _fa\"> </span></span>(30)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:750.76404px;\">Employ<span class=\"_ _1\"/>ee bene\ufb01ts r<span class=\"_ _1\"/>eserve<span class=\"_ _1f\"> </span><span class=\"ff1f\">150 <span class=\"_ _18a\"> </span></span>112 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:736.69476px;\">For<span class=\"_ _1\"/>eign currency tr<span class=\"_ _1\"/>anslation reserv<span class=\"_ _1\"/>e<span class=\"_ _129\"> </span><span class=\"ff1f\">296 <span class=\"_ _fa\"> </span></span>296 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:722.6255px;\">Distributable pro\ufb01ts r<span class=\"_ _1\"/>eserv<span class=\"_ _1\"/>e<span class=\"_ _14\"> </span><span class=\"ff1f\">3,541 <span class=\"_ _5\"> </span></span>58 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:708.5563px;\">Retained earnings<span class=\"_ _1ab\"> </span><span class=\"ff1f\">85 <span class=\"_ _163\"> </span></span>(9)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:691.5425px;\">T<span class=\"_ _0\"/>otal shareholders equity<span class=\"_ _8d\"> </span><span class=\"fc1\">33,035 <span class=\"_ _bf\"> </span><span class=\"ff20\">9,836 </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:677.48303px;\">Pro\ufb01t of par<span class=\"_ _1\"/>ent entity<span class=\"_ _196\"> </span><span class=\"ff1f\">6,665 <span class=\"_ _210\"> </span></span>18 </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:663.41376px;\">T<span class=\"_ _0\"/>otal compr<span class=\"_ _1\"/>ehensive income of par<span class=\"_ _1\"/>ent entity<span class=\"_ _103\"> </span><span class=\"ff1f\">6,665 <span class=\"_ _210\"> </span></span>18 </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:629.8149px;\">Guarantees </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:614.21484px;\">Woodside Energy Group Ltd and Woodside Energy Ltd (a </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:598.6188px;\">subsidiary company) are parties to a Deed of Cross Guarantee </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:583.02264px;\"><span class=\"_ _2e9\">as disclosed in Note E.8. The effect of the Deed is that Woodside </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:567.4266px;\">Energy Group Ltd has guaranteed to pay any de\ufb01ciency in </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:551.83044px;\">the event of winding up of the subsidiary company under </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:536.2344px;\">certain provisions of the <span class=\"ff23\">Corporations Act 2001</span>. The subsidiary </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:520.63824px;\">company has also given a similar guarantee in the event that </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:505.04218px;\">Woodside Energy Group Ltd is wound up.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:482.07507px;\">Woodside Energy Group Ltd has guaranteed the discharge by </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:466.47897px;\">a subsidiary company of its \ufb01nancial obligations under debt </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:450.88287px;\">facilities disclosed in Note C.2. Woodside Energy Group Ltd </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:435.28677px;\">has guaranteed certain obligations of subsidiaries to unrelated </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:419.69067px;\">parties on behalf of their performance in contracts. No liabilities </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:404.09457px;\">are expected to arise from these guarantees.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">E. Other it<span class=\"_ _1\"/>ems<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 wsb6\" style=\"bottom:359.92667px;\">E.8 Subsidiaries<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:331.97162px;\">(a) Subsidiaries<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:316.80164px;\"><span class=\"_ _2e9\">Name of entity<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:296.65518px; bottom:314.9589px;\">Notes<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:293.9379px;\">Ultimate Par<span class=\"_ _1\"/>ent Entity<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:279.86865px;\">W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Lt<span class=\"_ _1\"/>d<span class=\"_ _2a8\"> </span><span class=\"_ _2e9\">(1,2,3) </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:259.1694px;\">Subsidiaries</div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"bottom:244.25189px;\"> <span class=\"_ _fe\"> </span>Company name</div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"bottom:230.19241px;\"> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy L<span class=\"_ _1\"/>td<span class=\"_ _20c\"> </span><span class=\"_ _2e9\">(2,3,4) </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"bottom:216.12315px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Bro<span class=\"_ _1\"/>wse Pty Lt<span class=\"_ _1\"/>d<span class=\"_ _24e\"> </span><span class=\"_ _2e9\">(2,4) </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"bottom:202.0539px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Burrup Pty Ltd<span class=\"_ _5c\"> </span><span class=\"_ _2e9\">(2,4) </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"bottom:187.98465px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>Burrup Facilities Compan<span class=\"_ _1\"/>y Pty Ltd<span class=\"_ _fb\"> </span><span class=\"_ _2e9\">(5)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"bottom:173.92516px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>Burrup T<span class=\"_ _1\"/>r<span class=\"_ _1\"/>ain 1 Pty Ltd<span class=\"_ _36\"> </span><span class=\"_ _2e9\">(5)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"bottom:159.8559px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>Pluto LNG Pty Ltd<span class=\"_ _75\"> </span><span class=\"_ _2e9\">(5)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"bottom:145.78665px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Burrup T<span class=\"_ _0\"/>rain 2 A Pty Ltd<span class=\"_ _185\"> </span><span class=\"_ _2e9\">(2,4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"bottom:131.7174px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Burrup T<span class=\"_ _0\"/>rain 2 B Pty Ltd<span class=\"_ _168\"> </span><span class=\"_ _2e9\">(2,4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"bottom:117.6579px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (LNG Fuels and P<span class=\"_ _1\"/>ow<span class=\"_ _1\"/>er) Pty Ltd<span class=\"_ _71\"> </span><span class=\"_ _2e9\">(2,4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"bottom:103.58865px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Domestic Gas<span class=\"_ _1\"/>) Pty Ltd<span class=\"_ _6c\"> </span><span class=\"_ _2e9\">(2,4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"bottom:89.5194px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Algeria) Pty L<span class=\"_ _1\"/>td<span class=\"_ _187\"> </span><span class=\"_ _2e9\">(2,4) </span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"bottom:74.2119px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy A<span class=\"_ _1\"/>ustralia Asia Holdings Pte L<span class=\"_ _1\"/>td <span class=\"ff24\"><span class=\"_ _2e9\">y</span><span class=\"_ _11f\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"bottom:58.904404px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Holdings Int<span class=\"_ _1\"/>ernational Pty Ltd<span class=\"_ _6e\"> </span><span class=\"_ _2e9\">(2,4) </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:907.3125px;\"><span class=\"_ _2e9\">Name of entity<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:639.45465px; bottom:905.4697px;\">Notes</div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:891.07874px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Int<span class=\"_ _1\"/>ernational (Canada) Limit<span class=\"_ _1\"/>ed <span class=\"ff24\"><span class=\"_ _2e9\">t</span><span class=\"_ _ce\"> </span></span><span class=\"_ _2e9\">(4) </span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:877.00946px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1 wsb7\">   W<span class=\"_ _1\"/>oodside <span class=\"_ _2a9\"/>Energy <span class=\"_ _2a9\"/>(<span class=\"_ _1\"/><span class=\"ws0\">Canada LNG) Limited <span class=\"ff24\"><span class=\"_ _2e9\">t</span><span class=\"_ _e8\"> </span></span><span class=\"_ _2e9\">(4)</span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:862.6477px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1 wsb7\">   W<span class=\"_ _1\"/>oodside <span class=\"_ _2a9\"/>Energy <span class=\"_ _2a9\"/>(<span class=\"_ _1\"/><span class=\"ws0\">Canada PTP) Limited <span class=\"ff24\"><span class=\"_ _2e9\">t</span><span class=\"_ _8f\"> </span></span><span class=\"_ _2e9\">(4) </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:847.0477px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>KM LNG Operating Gener<span class=\"_ _1\"/>al Partnership <span class=\"ff24\"><span class=\"_ _2e9\">t</span><span class=\"_ _113\"> </span></span><span class=\"_ _2e9\">(9) </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:832.97845px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1 wsb7\">    KM <span class=\"_ _2a9\"/>LNG <span class=\"_ _2a9\"/>Operating <span class=\"_ _2a9\"/>Lt<span class=\"_ _1\"/>d <span class=\"_ _2a9\"/><span class=\"ff24 ws0\"><span class=\"_ _2e9\">t</span><span class=\"_ _3c\"> </span><span class=\"ff20\"><span class=\"_ _2e9\">(4) </span></span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:818.90924px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Holdings Pty L<span class=\"_ _1\"/>td<span class=\"_ _187\"> </span><span class=\"_ _2e9\">(2,4) </span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:804.83997px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Holdings (US<span class=\"_ _1\"/>A) Inc <span class=\"ff24\"><span class=\"_ _2e9\">q</span><span class=\"_ _199\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:790.77075px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (USA<span class=\"_ _1\"/>) Inc <span class=\"ff24\"><span class=\"_ _2e9\">q</span><span class=\"_ _14d\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:776.7015px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1 wsb7\">    Gryphon <span class=\"_ _2a9\"/>Exploration <span class=\"_ _2a9\"/>Compan<span class=\"_ _1\"/>y <span class=\"_ _2a9\"/><span class=\"ff24 ws0\"><span class=\"_ _2e9\">q</span><span class=\"_ _168\"> </span><span class=\"ff20\"><span class=\"_ _2e9\">(4)</span></span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:762.6322px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>PT W<span class=\"_ _1\"/>oodside Energy Indonesia <span class=\"ff24\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"_ _9b\"> </span></span><span class=\"_ _2e9\">(6)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:748.563px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (<span class=\"_ _1\"/>Cameroon) S<span class=\"_ _1\"/>ARL <span class=\"ff25\"><span class=\"_ _2e9\">n</span><span class=\"_ _48\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:734.4937px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (<span class=\"_ _1\"/>Gabon) Pty Ltd<span class=\"_ _196\"> </span><span class=\"_ _2e9\">(2,4) </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:720.4245px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Indonesia) Pty Lt<span class=\"_ _1\"/>d<span class=\"_ _5e\"> </span><span class=\"_ _2e9\">(2,4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:706.3552px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Indonesia II) Pty Lt<span class=\"_ _1\"/>d<span class=\"_ _18c\"> </span><span class=\"_ _2e9\">(2,4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:692.28595px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Mala<span class=\"_ _1\"/>ysia) Pty Lt<span class=\"_ _1\"/>d<span class=\"_ _100\"> </span><span class=\"_ _2e9\">(2,4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:677.7195px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Ir<span class=\"_ _1\"/>eland) Pty Ltd<span class=\"_ _185\"> </span><span class=\"_ _2e9\">(2,4) </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:663.6502px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (K<span class=\"_ _1\"/>orea) Pte L<span class=\"_ _1\"/>td <span class=\"ff24\"><span class=\"_ _2e9\">y</span><span class=\"_ _196\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:649.581px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (K<span class=\"_ _1\"/>orea II) Pte L<span class=\"_ _1\"/>td <span class=\"ff24\"><span class=\"_ _2e9\">y</span><span class=\"_ _100\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:635.5117px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (My<span class=\"_ _1\"/>anmar) Pte Lt<span class=\"_ _1\"/>d <span class=\"ff24\"><span class=\"_ _2e9\">y</span><span class=\"_ _ea\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:621.4522px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Mor<span class=\"_ _1\"/>occo<span class=\"_ _1\"/>) Pty Ltd<span class=\"_ _186\"> </span><span class=\"_ _2e9\">(2,4) </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:607.383px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Ne<span class=\"_ _1\"/>w Zealand) Limit<span class=\"_ _1\"/>ed <span class=\"ff24\"><span class=\"_ _2e9\">z</span><span class=\"_ _13d\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:593.3235px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Ne<span class=\"_ _1\"/>w Zealand 55<span class=\"_ _1\"/>794) Limit<span class=\"_ _1\"/>ed <span class=\"ff24\"><span class=\"_ _2e9\">z</span><span class=\"_ _14b\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:579.2542px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Peru) Pty L<span class=\"_ _1\"/>td<span class=\"_ _e6\"> </span><span class=\"_ _2e9\">(2,4) </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:565.1947px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Senegal) Pty L<span class=\"_ _1\"/>td<span class=\"_ _2f\"> </span><span class=\"_ _2e9\">(2,4) </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:551.1255px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (T<span class=\"_ _2\"/>anzania) Limited <span class=\"ff26\"><span class=\"_ _2e9\">3</span><span class=\"_ _221\"> </span></span><span class=\"_ _2e9\">(7)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:537.0562px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Holdings II Pty L<span class=\"_ _1\"/>td<span class=\"_ _19d\"> </span><span class=\"_ _2e9\">(2,4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:522.9967px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Pow<span class=\"_ _1\"/>er Pty Ltd<span class=\"_ _285\"> </span><span class=\"_ _2e9\">(2,4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:508.9275px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Pow<span class=\"_ _1\"/>er (Gener<span class=\"_ _1\"/>ation) Pty Lt<span class=\"_ _1\"/>d<span class=\"_ _18b\"> </span><span class=\"_ _2e9\">(2,4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:494.85822px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Holdings (South America) Pty L<span class=\"_ _1\"/>td<span class=\"_ _6a\"> </span><span class=\"_ _2e9\">(2,4) </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:480.789px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energia (Br<span class=\"_ _1\"/>asil) Apoio Administr<span class=\"_ _1\"/>ativ<span class=\"_ _1\"/>o Ltda <span class=\"ff25\"><span class=\"_ _2e9\">l</span><span class=\"ff22\"> <span class=\"_ _f8\"> </span></span></span><span class=\"_ _2e9\">(8)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:466.7295px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Holdings (UK) Pty L<span class=\"_ _1\"/>td <span class=\"_ _88\"> </span><span class=\"_ _2e9\">(2,4) </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:452.66022px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (UK) Limit<span class=\"_ _1\"/>ed <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _85\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:438.59097px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Finance (UK) Limit<span class=\"_ _1\"/>ed <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _33\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:424.52173px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (<span class=\"_ _1\"/>Congo<span class=\"_ _1\"/>) Limited <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _1f\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:410.46222px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Bulgaria) Limited <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _e9\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:396.39297px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Holdings (Senegal) Limit<span class=\"_ _1\"/>ed <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _74\"> </span></span><span class=\"_ _2e9\">(4) </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:382.32373px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1 wsb7\">    W<span class=\"_ _1\"/>oodside <span class=\"_ _2a9\"/>Energy <span class=\"_ _2a9\"/><span class=\"ws0\">(Senegal) B.<span class=\"_ _2\"/>V<span class=\"_ _0\"/>.<span class=\"ff26\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"_ _19c\"> </span></span><span class=\"_ _2e9\">(4) </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:368.2545px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Fr<span class=\"_ _1\"/>ance<span class=\"_ _1\"/>) SAS <span class=\"ff25\"><span class=\"_ _2e9\">\u00a3</span><span class=\"_ _187\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:354.18524px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Iberia S.A. <span class=\"ff26\"><span class=\"_ _2e9\">\u00ba</span><span class=\"_ _213\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:340.12573px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (N.A.) L<span class=\"_ _1\"/>td <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _291\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:326.0565px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Servic<span class=\"_ _1\"/>es (Qingdao<span class=\"_ _1\"/>) Co Lt<span class=\"_ _1\"/>d <span class=\"ff25\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"_ _cf\"> </span></span><span class=\"_ _2e9\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:311.98724px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Julimar Pty L<span class=\"_ _1\"/>td<span class=\"_ _85\"> </span><span class=\"_ _2e9\">(2,4) </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:297.92773px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Norw<span class=\"_ _1\"/>ay) Pty L<span class=\"_ _1\"/>td<span class=\"_ _aa\"> </span><span class=\"_ _2e9\">(2,4) </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:283.8585px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy T<span class=\"_ _2\"/>echnologies Pty Ltd<span class=\"_ _28d\"> </span><span class=\"_ _2e9\">(2,4,14) </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"left:342.73032px; bottom:269.7892px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside T<span class=\"_ _0\"/>echnology Solutions Pty Ltd<span class=\"_ _1a3\"> </span><span class=\"_ _2e9\">(2,4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:255.71997px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Scarbor<span class=\"_ _1\"/>ough Pty Ltd<span class=\"_ _ea\"> </span><span class=\"_ _2e9\">(2,4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:241.66049px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Carbon Holdings Pty L<span class=\"_ _1\"/>td<span class=\"_ _19f\"> </span><span class=\"_ _2e9\">(2,4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:227.59122px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Carbon (As<span class=\"_ _1\"/>sets) Pty Lt<span class=\"_ _1\"/>d<span class=\"_ _117\"> </span><span class=\"_ _2e9\">(2,4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:213.52197px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Carbon (Servic<span class=\"_ _1\"/>es) Pty Lt<span class=\"_ _1\"/>d<span class=\"_ _8e\"> </span><span class=\"_ _2e9\">(2,4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:199.46248px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Financial A<span class=\"_ _1\"/>dvisory Services) Pty L<span class=\"_ _1\"/>td<span class=\"_ _79\"> </span><span class=\"_ _2e9\">(2,4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:185.39323px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy T<span class=\"_ _0\"/>rading Singapor<span class=\"_ _1\"/>e Pte Ltd <span class=\"ff24\"><span class=\"_ _2e9\">y</span><span class=\"_ _27c\"> </span></span><span class=\"_ _2e9\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:171.33372px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>elCap Insuranc<span class=\"_ _1\"/>e Pte Ltd <span class=\"ff24\"><span class=\"_ _2e9\">y</span><span class=\"_ _24f\"> </span></span><span class=\"_ _2e9\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:157.26448px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Shipping Singapor<span class=\"_ _1\"/>e Pte Lt<span class=\"_ _1\"/>d <span class=\"ff24\"><span class=\"_ _2e9\">y</span><span class=\"_ _cc\"> </span></span><span class=\"_ _2e9\">(4) </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:143.19524px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>Metasource Pty L<span class=\"_ _1\"/>td<span class=\"_ _a3\"> </span><span class=\"_ _2e9\">(2,4) </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:129.13573px;\"> <span class=\"_ _4b\"> </span>Mermaid Sound Port and Marine Services Pty Lt<span class=\"_ _1\"/>d<span class=\"_ _c9\"> </span><span class=\"_ _2e9\">(2,4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:115.06648px;\"> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Finance Limited<span class=\"_ _81\"> </span><span class=\"_ _2e9\">(2,4) </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:100.99722px;\"> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Petr<span class=\"_ _1\"/>oleum (Timor Sea 19) Pty Lt<span class=\"_ _1\"/>d<span class=\"_ _212\"> </span><span class=\"_ _2e9\">(2,4) </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:86.92798px;\"> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Petr<span class=\"_ _1\"/>oleum (Timor Sea 20) Pty Lt<span class=\"_ _1\"/>d<span class=\"_ _6c\"> </span><span class=\"_ _2e9\">(2,4) </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:72.86848px;\"> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Petr<span class=\"_ _1\"/>oleum Holdings Pty Ltd<span class=\"_ _3\"> </span><span class=\"_ _2e9\">(2,4,15) </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:58.799232px;\"> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Global Holdings Pty L<span class=\"_ _1\"/>td<span class=\"_ _29c\"> </span><span class=\"_ _2e9\">(2,4)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls45 ws4f\" style=\"bottom:1.4145012px;\">152<span class=\"_ _1a0\"> </span><span class=\"ff21 fc5 ls0 ws0\">|     Annual Report 2022<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">E. Other it<span class=\"_ _1\"/>ems<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">E.8 <span class=\"_ _1d\"> </span>Subsidiaries (con<span class=\"_ _1\"/>t.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:904.38086px;\"><span class=\"_ _2e9\">Name of entity<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:296.65518px; bottom:902.5381px;\">Notes</div><div class=\"t m0 hb8 ff20 fs4b fc1d sc0 ls0 ws0\" style=\"bottom:888.1471px;\"> <span class=\"_ _4b\"> </span><span class=\"fc1\"> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Global Pty L<span class=\"_ _1\"/>td <span class=\"_ _259\"> </span><span class=\"_ _2e9\">(2,4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"bottom:874.0778px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>Perdido Me<span class=\"_ _1\"/>xico Pipeline Holdings, S.A. de C.<span class=\"_ _2\"/>V<span class=\"_ _1\"/>. <span class=\"ff26\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"_ _6\"> </span></span><span class=\"_ _2e9\">(10)</span></div><div class=\"t m0 hb8 ff20 fs4b fc18 sc0 ls0 ws0\" style=\"bottom:860.0086px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>Perdido Me<span class=\"_ _1\"/>xico Pipeline, S. de R.L. de C.<span class=\"_ _2\"/>V<span class=\"_ _0\"/>. <span class=\"ff26\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"_ _eb\"> </span></span><span class=\"fc1\"><span class=\"_ _2e9\">(10)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"bottom:845.93933px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy In<span class=\"_ _1\"/>ves<span class=\"_ _1\"/>tments Pty Ltd  <span class=\"_ _35\"> </span><span class=\"_ _2e9\">(2,4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc18 sc0 ls0 ws0\" style=\"bottom:831.8701px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energia Br<span class=\"_ _1\"/>asil Inv<span class=\"_ _1\"/>estimentos L<span class=\"_ _1\"/>tda. <span class=\"ff25\"><span class=\"_ _2e9\">l</span><span class=\"_ _6\"> </span></span><span class=\"fc1\"><span class=\"_ _2e9\">(11)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc18 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:817.80084px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energia Br<span class=\"_ _1\"/>asil Explora\u00e7\u00e3o e Pr<span class=\"_ _1\"/>odu\u00e7\u00e3o Ltda. <span class=\"ff25\"><span class=\"_ _2e9\">l</span><span class=\"_ _14a\"> </span></span><span class=\"fc1 ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc18 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:803.7316px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (<span class=\"_ _1\"/>Grea<span class=\"_ _1\"/>t Britain) Limited <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _117\"> </span></span><span class=\"fc1 ls6e ws87\">(4<span class=\"_ _4f\"/>)</span></div><div class=\"t m0 hb8 ff20 fs4b fc18 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:789.66235px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (North W<span class=\"_ _0\"/>est Shelf<span class=\"_ _4f\"/>) Pty Lt<span class=\"_ _1\"/>d <span class=\"_ _126\"> </span><span class=\"fc1\">(2,4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc18 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:775.5931px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (T<span class=\"_ _0\"/>rinidad) Holdings Ltd <span class=\"ff25\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"_ _8b\"> </span></span><span class=\"fc1 ls6e ws87\">(4<span class=\"_ _4f\"/>)</span></div><div class=\"t m0 hb8 ff20 fs4b fc18 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:761.52386px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (T<span class=\"_ _0\"/>rinidad-3A) Lt<span class=\"_ _1\"/>d <span class=\"ff26\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"_ _48\"> </span></span><span class=\"fc1 ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:747.4546px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy US<span class=\"_ _1\"/>A Operations Inc <span class=\"ff24\"><span class=\"_ _2e9\">q</span><span class=\"_ _3\"> </span></span>(12)</div><div class=\"t m0 hb8 ff20 fs4b fc18 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:733.3854px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>Hamilton Brothers Pe<span class=\"_ _1\"/>troleum Corpor<span class=\"_ _1\"/>ation <span class=\"ff24\"><span class=\"_ _2e9\">q</span><span class=\"_ _1aa\"> </span></span><span class=\"fc1 ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:719.3161px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>Hamilton Oil Company LL<span class=\"_ _1\"/>C <span class=\"ff24\"><span class=\"_ _2e9\">q</span><span class=\"_ _20d\"> </span></span><span class=\"ls6e ws87\">(4<span class=\"_ _4f\"/>)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:705.2468px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Boliviana Inc. <span class=\"ff24\"><span class=\"_ _2e9\">q</span><span class=\"_ _10e\"> </span></span><span class=\"ls6e ws87\">(4<span class=\"_ _4f\"/>)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:691.1776px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (North America) LL<span class=\"_ _1\"/>C <span class=\"ff24\"><span class=\"_ _2e9\">q</span><span class=\"_ _30\"> </span></span><span class=\"ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:677.10834px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Americas<span class=\"_ _1\"/>) Inc. <span class=\"ff24\"><span class=\"_ _2e9\">q</span><span class=\"_ _19c\"> </span></span><span class=\"ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 wsb7\" style=\"left:1.8680992px; bottom:663.0391px;\">    W<span class=\"_ _1\"/>oodside <span class=\"_ _2a9\"/>Energy <span class=\"_ _2a9\"/>(<span class=\"_ _1\"/>GOM) <span class=\"_ _2a9\"/>Inc. <span class=\"_ _2a9\"/><span class=\"ff24 ws0\"><span class=\"_ _2e9\">q</span><span class=\"_ _ee\"> </span><span class=\"ff20 ls6e ws87\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:648.96985px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Ha<span class=\"_ _1\"/>waii Inc. <span class=\"ff24\"><span class=\"_ _2e9\">q</span><span class=\"_ _109\"> </span></span>(4,<span class=\"_ _1\"/>16)</div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:634.9006px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Resour<span class=\"_ _1\"/>ces Inc. <span class=\"ff24\"><span class=\"_ _2e9\">q</span><span class=\"_ _3d\"> </span></span><span class=\"ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:620.83136px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Holdings (Resour<span class=\"_ _1\"/>ces<span class=\"_ _1\"/>) Inc. <span class=\"ff24\"><span class=\"_ _2e9\">q</span><span class=\"_ _cc\"> </span></span><span class=\"ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 wsb7\" style=\"left:1.8680992px; bottom:606.77185px;\">     W<span class=\"_ _1\"/>oodside <span class=\"_ _2a9\"/>Energy <span class=\"_ _2a9\"/>USA <span class=\"_ _2a9\"/>Servic<span class=\"_ _1\"/>es <span class=\"_ _2a9\"/>Inc. <span class=\"_ _2a9\"/><span class=\"ff24 ws0\"><span class=\"_ _2e9\">q</span><span class=\"_ _20e\"> </span><span class=\"ff20 ls6e ws87\">(4<span class=\"_ _4f\"/>)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 wsb7\" style=\"left:1.8680992px; bottom:592.7026px;\">     W<span class=\"_ _1\"/>oodside <span class=\"_ _2a9\"/>Energy <span class=\"_ _2a9\"/>Mark<span class=\"_ _1\"/>eting <span class=\"_ _2a9\"/>Inc. <span class=\"_ _2a9\"/><span class=\"ff24 ws0\"><span class=\"_ _2e9\">q</span><span class=\"_ _186\"> </span><span class=\"ff20 ls6e ws87\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 wsb7\" style=\"left:1.8680992px; bottom:578.63336px;\">     W<span class=\"_ _1\"/>oodside <span class=\"_ _2a9\"/>Energy <span class=\"_ _2a9\"/>(Deep<span class=\"_ _1\"/>water) <span class=\"_ _2a9\"/>Inc. <span class=\"_ _2a9\"/><span class=\"ff24 ws0\"><span class=\"_ _2e9\">q</span><span class=\"_ _19f\"> </span><span class=\"ff20\">(4,17)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:564.5641px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (F<span class=\"_ _1\"/>oreign Explor<span class=\"_ _1\"/>ation Holdings) LL<span class=\"_ _1\"/>C <span class=\"ff24\"><span class=\"_ _2e9\">q</span><span class=\"_ _79\"> </span></span><span class=\"ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:550.5046px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (T<span class=\"_ _0\"/>rinidad Block 3) Limited <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _129\"> </span></span><span class=\"ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:536.43536px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (T<span class=\"_ _0\"/>rinidad Block 6) Limited <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _124\"> </span></span><span class=\"ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:522.3661px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (T<span class=\"_ _0\"/>rinidad Block 5) Limited <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _129\"> </span></span><span class=\"ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:508.30658px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (T<span class=\"_ _0\"/>rinidad Block 7) Limited <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _129\"> </span></span><span class=\"ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:494.23737px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (T<span class=\"_ _0\"/>rinidad Block 14) Limited <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _38\"> </span></span><span class=\"ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:480.1681px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (T<span class=\"_ _0\"/>rinidad Block 23A) Limited <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _175\"> </span></span><span class=\"ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:466.09885px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (T<span class=\"_ _0\"/>rinidad Block 23B) Limited <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _ce\"> </span></span><span class=\"ls6e ws87\">(4<span class=\"_ _4f\"/>)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:452.0296px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (T<span class=\"_ _0\"/>rinidad Block 28) Limited <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _c\"> </span></span><span class=\"ls6e ws87\">(4<span class=\"_ _4f\"/>)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:437.9701px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (T<span class=\"_ _0\"/>rinidad Block 29) Limited <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _c\"> </span></span><span class=\"ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 wsb7\" style=\"left:1.8680992px; bottom:423.90085px;\">    W<span class=\"_ _1\"/>oodside <span class=\"_ _2a9\"/>Energy <span class=\"_ _2a9\"/>(Bimshir<span class=\"_ _1\"/>e) <span class=\"_ _2a9\"/>Limited <span class=\"_ _2a9\"/><span class=\"ff24 ws0\"><span class=\"_ _2e9\">p</span><span class=\"_ _ff\"> </span><span class=\"ff20 ls6e ws87\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:409.8316px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (South A<span class=\"_ _1\"/>frica 3B/<span class=\"_ _0\"/>4B) Limited <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _26b\"> </span></span><span class=\"ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 wsb7\" style=\"left:1.8680992px; bottom:395.7721px;\">    W<span class=\"_ _1\"/>oodside <span class=\"_ _2a9\"/>Energy <span class=\"_ _2a9\"/>(Egypt) <span class=\"_ _2a9\"/>Limit<span class=\"_ _1\"/>ed <span class=\"_ _2a9\"/><span class=\"ff24 ws0\"><span class=\"_ _2e9\">p</span><span class=\"_ _48\"> </span><span class=\"ff20 ls6e ws87\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:381.70285px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (<span class=\"_ _1\"/>Carlisle Bay) Limit<span class=\"_ _1\"/>ed <span class=\"ff24\"><span class=\"_ _2e9\">p</span><span class=\"_ _66\"> </span></span><span class=\"ls6e ws87\">(4<span class=\"_ _4f\"/>)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 wsb7\" style=\"left:1.8680992px; bottom:367.6336px;\">    W<span class=\"_ _1\"/>oodside <span class=\"_ _2a9\"/>Energy <span class=\"_ _2a9\"/>(Me<span class=\"_ _1\"/>xico<span class=\"_ _1\"/>) <span class=\"_ _2a9\"/>Limited <span class=\"_ _2a9\"/><span class=\"ff24 ws0\"><span class=\"_ _2e9\">p</span><span class=\"_ _ea\"> </span><span class=\"ff20 ls6e ws87\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 wsb7\" style=\"left:1.8680992px; bottom:353.56436px;\">     W<span class=\"_ _1\"/>oodside <span class=\"_ _2a9\"/>Energ\u00eda <span class=\"_ _2a9\"/>Servicios <span class=\"_ _2a9\"/>Adminis<span class=\"_ _1\"/>trativ<span class=\"_ _1\"/>os,<span class=\"ws0\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 wsb7\" style=\"left:1.8680992px; bottom:341.86435px;\">     S. <span class=\"_ _2a9\"/>de <span class=\"_ _2a9\"/>R.L. <span class=\"_ _2a9\"/>de <span class=\"_ _2a9\"/>C.<span class=\"_ _0\"/>V<span class=\"_ _1\"/>. <span class=\"_ _2a9\"/><span class=\"ff26 ws0\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"_ _20c\"> </span><span class=\"ff20\">(13)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:327.7951px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energ\u00eda Servicios de M\u00e9<span class=\"_ _1\"/>xico, S. de R.L. de C.<span class=\"_ _2\"/>V<span class=\"_ _0\"/>. <span class=\"ff26\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"_ _176\"> </span></span>(13)</div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 wsb7\" style=\"left:1.8680992px; bottom:313.7356px;\">     W<span class=\"_ _1\"/>oodside <span class=\"_ _2a9\"/>Energy <span class=\"_ _2a9\"/>(Me<span class=\"_ _1\"/>xico <span class=\"_ _2a9\"/>Holdings) <span class=\"_ _2a9\"/>LL<span class=\"_ _1\"/>C <span class=\"_ _2a9\"/><span class=\"ff24 ws0\"><span class=\"_ _2e9\">q</span><span class=\"_ _190\"> </span><span class=\"ff20 ls6e ws87\">(4)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:299.66635px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>Operaciones Conjuntas, S. de R.L. de C.<span class=\"_ _2\"/>V<span class=\"_ _0\"/>. <span class=\"ff26\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"_ _190\"> </span></span>(13)</div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:285.5971px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energ\u00eda Holdings de M\u00e9<span class=\"_ _1\"/>xico, S. de R.L. de C.<span class=\"_ _2\"/>V<span class=\"_ _0\"/>. <span class=\"ff26\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"_ _bb\"> </span></span>(13)</div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 wsb7\" style=\"left:1.8680992px; bottom:271.52786px;\">      W<span class=\"_ _1\"/>oodside <span class=\"_ _2a9\"/>Petr\u00f3leo <span class=\"_ _2a9\"/>Oper<span class=\"_ _1\"/>aciones <span class=\"_ _2a9\"/>de <span class=\"_ _2a9\"/>M\u00e9xico<span class=\"_ _1\"/>, <span class=\"_ _2a9\"/><span class=\"ws0\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 wsb7\" style=\"left:1.8680992px; bottom:259.82785px;\">      S. <span class=\"_ _2a9\"/>de <span class=\"_ _2a9\"/>R.L. <span class=\"_ _2a9\"/>de <span class=\"_ _2a9\"/>C.<span class=\"_ _0\"/>V<span class=\"_ _1\"/>. <span class=\"_ _2a9\"/><span class=\"ff26 ws0\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"_ _20b\"> </span><span class=\"ff20\">(13)</span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:245.76834px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (A<span class=\"_ _1\"/>ustralia) Pty L<span class=\"_ _1\"/>td <span class=\"_ _100\"> </span>(2,4)</div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:231.6991px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Int<span class=\"_ _1\"/>ernational Exploration) Pty L<span class=\"_ _1\"/>td <span class=\"_ _177\"> </span>(2,4)</div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:217.62985px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (Bass Str<span class=\"_ _1\"/>ait) Pty Lt<span class=\"_ _1\"/>d <span class=\"_ _35\"> </span>(2,4)</div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:203.5606px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (V<span class=\"_ _1\"/>ictoria) Pty Ltd <span class=\"_ _146\"> </span>(2,4)</div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:189.5011px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy Holdings LL<span class=\"_ _1\"/>C <span class=\"ff24\"><span class=\"_ _2e9\">q</span><span class=\"_ _259\"> </span></span><span class=\"ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:175.43185px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (T<span class=\"_ _0\"/>rinidad-2C) Ltd <span class=\"ff24\"><span class=\"_ _2e9\">t</span><span class=\"_ _2a6\"> </span></span><span class=\"ls6e ws87\">(4)</span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:161.3626px;\"> <span class=\"_ _4b\"> </span> <span class=\"_ _4b\"> </span>W<span class=\"_ _1\"/>oodside Energy (<span class=\"_ _1\"/>Canada) Corpor<span class=\"_ _1\"/>ation <span class=\"ff24\"><span class=\"_ _2e9\">t</span><span class=\"_ _14\"> </span></span><span class=\"ls6e ws87\">(4)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"bottom:141.23029px;\">1. <span class=\"_ _29\"> </span>W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Lt<span class=\"_ _1\"/>d, pre<span class=\"_ _1\"/>viously W<span class=\"_ _1\"/>oodside Petroleum L<span class=\"_ _1\"/>td, is the ultimate<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:130.31029px;\">holding company and the head entity within the tax c<span class=\"_ _1\"/>onsolidated gr<span class=\"_ _1\"/>oup.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"bottom:117.55208px;\">2.  These companies wer<span class=\"_ _1\"/>e members of the Austr<span class=\"_ _1\"/>alian tax consolidated gr<span class=\"_ _1\"/>oup at 31<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:106.63208px;\">December 2022.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"bottom:93.873886px;\">3.  W<span class=\"_ _1\"/>oodside Energy Gr<span class=\"_ _1\"/>oup Ltd and W<span class=\"_ _1\"/>oodside Ener<span class=\"_ _1\"/>gy Ltd ar<span class=\"_ _1\"/>e parties to a Deed of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:11.078209px; bottom:82.95388px;\">Cross Guar<span class=\"_ _1\"/>antee.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"bottom:70.19568px;\">4.  All subsidiaries ar<span class=\"_ _1\"/>e wholly owned e<span class=\"_ _1\"/>x<span class=\"_ _1\"/>cept those ref<span class=\"_ _1\"/>erred to in Not<span class=\"_ _1\"/>es 5 to 13.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:908.59686px;\">5.  Kansai Electric Pow<span class=\"_ _1\"/>er Austr<span class=\"_ _1\"/>alia Pty Ltd and T<span class=\"_ _2\"/>okyo Gas Pluto Pty Lt<span class=\"_ _1\"/>d each hold a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:897.6769px;\">5% inter<span class=\"_ _1\"/>est in the shares of these subsidiaries. T<span class=\"_ _1\"/>hese subsidiaries are contr<span class=\"_ _1\"/>olled.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:884.9187px;\">6.  PT W<span class=\"_ _0\"/>oodside Energy Indonesia was incorpor<span class=\"_ _1\"/>ated on 27 April 20<span class=\"_ _1\"/>22. As at 31<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:873.99866px;\">December 2022, W<span class=\"_ _0\"/>oodside Energy Holdings Pty Ltd held a 99% inter<span class=\"_ _1\"/>est in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:863.0787px;\">the shares of PT W<span class=\"_ _0\"/>oodside Energy Indonesia. W<span class=\"_ _1\"/>oodside Energy L<span class=\"_ _1\"/>td held the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:852.1587px;\">remaining 1% int<span class=\"_ _1\"/>erest.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls8 wsd\" style=\"left:342.73032px; bottom:839.40045px;\">7.<span class=\"_ _4f\"/> <span class=\"_ _16\"> </span><span class=\"ls0 ws0\">As at 31 December 2022, W<span class=\"_ _0\"/>oodside Energy Holdings Pty Ltd held &gt;99.99%<span class=\"_ _2e9\"> </span></span><span class=\"ls0 ws0\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:828.48047px;\">inter<span class=\"_ _1\"/>est in the shares of W<span class=\"_ _0\"/>oodside Energy (T<span class=\"_ _0\"/>anzania) Limited and W<span class=\"_ _1\"/>oodside<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:817.5605px;\">Energy L<span class=\"_ _1\"/>td held the remaining int<span class=\"_ _1\"/>erest.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:804.8023px;\">8.  As at 31 December 2022, W<span class=\"_ _0\"/>oodside Energy Holdings (South America) Pty<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:793.88226px;\">Ltd held &gt;99<span class=\"_ _1\"/>.99% interes<span class=\"_ _1\"/>t in the shares of W<span class=\"_ _1\"/>oodside Ener<span class=\"_ _1\"/>gia (Brasil) Apoio<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:782.9623px;\">Administr<span class=\"_ _1\"/>ativ<span class=\"_ _1\"/>o Ltda and W<span class=\"_ _1\"/>oodside Ener<span class=\"_ _1\"/>gy Ltd held the r<span class=\"_ _1\"/>emaining inter<span class=\"_ _1\"/>est.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls7 wsc\" style=\"left:342.73032px; bottom:770.2041px;\">9.  <span class=\"ls0 ws0\">As at 31 December 2022, W<span class=\"_ _0\"/>oodside Energy International (<span class=\"_ _1\"/>Canada) Limited and<span class=\"_ _2e9\"> </span></span><span class=\"ls0 ws0\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:759.28406px;\">W<span class=\"_ _1\"/>oodside Energy (<span class=\"_ _1\"/>Canada LNG) Limited w<span class=\"_ _1\"/>ere the gener<span class=\"_ _1\"/>al partners of the KM<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:748.3641px;\">LNG Operating Gener<span class=\"_ _1\"/>al Partnership holding a 99.99% and 0<span class=\"_ _1\"/>.01% partnership<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:737.4441px;\">inter<span class=\"_ _1\"/>est, respectiv<span class=\"_ _1\"/>ely<span class=\"_ _0\"/>.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:724.68585px;\">10. <span class=\"_ _2\"/>As at 31 December 2022, W<span class=\"_ _1\"/>oodside Ener<span class=\"_ _1\"/>gy Global Holdings Pty Ltd held a<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:713.76587px;\">99.99% inter<span class=\"_ _1\"/>est in shares of P<span class=\"_ _1\"/>erdido Me<span class=\"_ _1\"/>xico Pipeline Holdings, S.A. de C.<span class=\"_ _0\"/>V<span class=\"_ _0\"/>. and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:702.8459px;\">Perdido Me<span class=\"_ _1\"/>xico Pipeline, S. de R.L. de C.<span class=\"_ _2\"/>V<span class=\"_ _1\"/>. W<span class=\"_ _0\"/>oodside Energy Inves<span class=\"_ _1\"/>tments Pty Ltd<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:691.9259px;\">held the remaining 0<span class=\"_ _1\"/>.01% inter<span class=\"_ _1\"/>est.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:679.16766px;\">11. <span class=\"_ _4a\"> </span>As at 31 December 2022, W<span class=\"_ _1\"/>oodside Ener<span class=\"_ _1\"/>gy Inv<span class=\"_ _1\"/>estments Pty Ltd held a 99<span class=\"_ _1\"/>.97%<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:668.2477px;\">inter<span class=\"_ _1\"/>est in shares of W<span class=\"_ _0\"/>oodside Energia Brasil Inv<span class=\"_ _1\"/>estimentos L<span class=\"_ _1\"/>tda. W<span class=\"_ _1\"/>oodside<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:657.3277px;\">Energy Global Holdings Pty Lt<span class=\"_ _1\"/>d held the remaining 0<span class=\"_ _1\"/>.03% inter<span class=\"_ _1\"/>est.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:644.56946px;\">12. As a<span class=\"_ _1\"/>t 31 December 2022, W<span class=\"_ _1\"/>oodside Ener<span class=\"_ _1\"/>gy Global Holdings Pty Ltd held<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:633.6495px;\">90% voting int<span class=\"_ _1\"/>erest and 3<span class=\"_ _1\"/>7<span class=\"_ _0\"/>.67% inter<span class=\"_ _1\"/>est in shares of W<span class=\"_ _0\"/>oodside Energy USA<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:622.7295px;\">Operations Inc. W<span class=\"_ _0\"/>oodside Energy Holdings LLC held the r<span class=\"_ _1\"/>emaining 10% voting<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:611.8095px;\">inter<span class=\"_ _1\"/>est and 62.33% interes<span class=\"_ _1\"/>t in shares.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:599.0513px;\">13. <span class=\"_ _1\"/>As at 31 December 2022, W<span class=\"_ _0\"/>oodside Energy (Mexico<span class=\"_ _1\"/>) Limited held a 99% inter<span class=\"_ _1\"/>est<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:588.1313px;\">in shares of W<span class=\"_ _0\"/>oodside Energ\u00eda Servicios Administr<span class=\"_ _1\"/>ativos, S. de R.L. de C.<span class=\"_ _2\"/>V<span class=\"_ _1\"/>.,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:577.2113px;\">W<span class=\"_ _1\"/>oodside Energ\u00eda Servicios de M\u00e9<span class=\"_ _1\"/>xico<span class=\"_ _1\"/>, S. de R.L. de C.<span class=\"_ _0\"/>V<span class=\"_ _0\"/>., Operaciones Conjuntas,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:566.29126px;\">S. de R.L. de C.<span class=\"_ _0\"/>V<span class=\"_ _0\"/>. and Woodside Petr<span class=\"_ _1\"/>\u00f3leo Operaciones de M\u00e9<span class=\"_ _1\"/>xico<span class=\"_ _1\"/>, S. de R.L. de<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:555.3713px;\">C.<span class=\"_ _0\"/>V<span class=\"_ _0\"/>. and 99.99% interest in shar<span class=\"_ _1\"/>es of W<span class=\"_ _1\"/>oodside Ener<span class=\"_ _1\"/>g\u00eda Holdings de M\u00e9xico<span class=\"_ _1\"/>,<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:544.4513px;\">S. de R.L. de C.<span class=\"_ _0\"/>V<span class=\"_ _0\"/>. Woodside Ener<span class=\"_ _1\"/>gy (Mexic<span class=\"_ _1\"/>o Holdings) LL<span class=\"_ _1\"/>C held the remaining<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:533.53125px;\">0.0<span class=\"_ _1\"/>1%-1% int<span class=\"_ _1\"/>erest.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:520.7731px;\">14. <span class=\"_ _0\"/>Woodside Ener<span class=\"_ _1\"/>gy T<span class=\"_ _0\"/>echnologies Pty Ltd o<span class=\"_ _1\"/>wns 28.50% in Blue Ocean Seismic<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:509.8531px;\">Services Limited which is ac<span class=\"_ _1\"/>counted for as an in<span class=\"_ _1\"/>ves<span class=\"_ _1\"/>tment in associate.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:497.0949px;\">15. <span class=\"_ _1\"/>W<span class=\"_ _1\"/>oodside Energy (North W<span class=\"_ _0\"/>est Shelf<span class=\"_ _4f\"/>) Pty Lt<span class=\"_ _1\"/>d and W<span class=\"_ _1\"/>oodside Petroleum Holdings<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:486.17487px;\">Pty Ltd o<span class=\"_ _1\"/>wns 16.67% in Int<span class=\"_ _1\"/>ernational Gas T<span class=\"_ _1\"/>r<span class=\"_ _1\"/>ansportation Company Limit<span class=\"_ _1\"/>ed<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:475.25488px;\">respectiv<span class=\"_ _1\"/>ely<span class=\"_ _0\"/>. This investment has been ac<span class=\"_ _1\"/>counted f<span class=\"_ _1\"/>or as an inv<span class=\"_ _1\"/>estment in<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:464.33487px;\">associate.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:451.5767px;\">16. <span class=\"_ _0\"/>Woodside Ener<span class=\"_ _1\"/>gy Hawaii Inc o<span class=\"_ _1\"/>wns 14.96% in Iwilei District Participating P<span class=\"_ _1\"/>arties<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:440.65668px;\">LLC which is ac<span class=\"_ _1\"/>counted f<span class=\"_ _1\"/>or as an inv<span class=\"_ _1\"/>estment in associate<span class=\"_ _1\"/>.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:427.89847px;\">17<span class=\"_ _0\"/>. <span class=\"_ _4f\"/>Woodside Ener<span class=\"_ _1\"/>gy (Deepw<span class=\"_ _1\"/>ater) Inc o<span class=\"_ _1\"/>wns 25% in Caesar Oil Pipeline Company<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:416.9785px;\">LLC, 22% in Cleopa<span class=\"_ _1\"/>tra Gas Gathering Company LL<span class=\"_ _1\"/>C and 10% in Marine W<span class=\"_ _1\"/>ell<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:406.05847px;\">Containment Compan<span class=\"_ _1\"/>y LLC. T<span class=\"_ _1\"/>hese inv<span class=\"_ _1\"/>estments are ac<span class=\"_ _1\"/>counted for as an<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h1a ff20 fse fc1 sc0 ls0 ws0\" style=\"left:354.3662px; bottom:395.1385px;\">inv<span class=\"_ _1\"/>estment in associate<span class=\"_ _1\"/>.<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:354.66312px;\">All subsidiaries were incorporated in Australia unless identi\ufb01ed<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:339.06702px;\">with one of the following symbols:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff25 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:316.09302px;\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"ff20 fs3 wsb8\"> Bermuda<span class=\"ws0\"> </span></span></div><div class=\"t m0 h6 ff25 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:300.493px;\"><span class=\"_ _2e9\">l</span><span class=\"ff20 fs3 wsb8\"> Brazil<span class=\"ws0\"> </span></span></div><div class=\"t m0 h6 ff25 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:284.893px;\"><span class=\"_ _2e9\">n</span><span class=\"ff20 fs3\"> <span class=\"_ _50\"/>Cameroon<span class=\"_ _2e9\"> </span></span><span class=\"ff20 fs3\"> </span></div><div class=\"t m0 h6 ff24 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:269.29303px;\"><span class=\"_ _2e9\">t</span><span class=\"ff20 fs3\"> Canada<span class=\"_ _2e9\"> </span></span><span class=\"ff20 fs3\"> </span></div><div class=\"t m0 h6 ff25 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:253.69302px;\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"ff20 fs3 wsb9\"> China<span class=\"ws0\"> </span></span></div><div class=\"t m0 h6 ff25 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:238.09302px;\"><span class=\"_ _2e9\">\u00a3</span><span class=\"ff20 fs3 wsba\"> France<span class=\"ws0\"> </span></span></div><div class=\"t m0 h6 ff26 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:222.49301px;\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"ff20 fs3 wsba\"> Mexico<span class=\"ws0\"> </span></span></div><div class=\"t m0 h6 ff24 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:206.89302px;\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"ff20 fs3 wsba\"> Indonesia<span class=\"ws0\"> </span></span></div><div class=\"t m0 h6 ff26 fs4b fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:191.29301px;\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"ff20 fs3 wsba\"> The <span class=\"_ _4f\"/>Netherlands<span class=\"ws0\"> </span></span></div><div class=\"t m0 h6 ff26 fs4b fc1 sc0 ls0 ws0\" style=\"left:506.9334px; bottom:316.09302px;\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"ff20 fs3\"> <span class=\"_ _1\"/>R. of Trinidad and Tobago<span class=\"_ _2e9\"> </span></span><span class=\"ff20 fs3\"> </span></div><div class=\"t m0 h6 ff24 fs4b fc1 sc0 ls0 ws0\" style=\"left:506.9334px; bottom:300.493px;\"><span class=\"_ _2e9\">z</span><span class=\"ff20 fs3\"> New Zealand<span class=\"_ _2e9\"> </span></span><span class=\"ff20 fs3\"> </span></div><div class=\"t m0 h6 ff25 fs4b fc1 sc0 ls0 ws0\" style=\"left:506.9334px; bottom:284.893px;\"><span class=\"_ _2e9\"><span class=\"_ _2e9\"> </span></span><span class=\"ff20 fs3 wsba\"> Saint <span class=\"_ _4f\"/>Lucia<span class=\"ws0\"> </span></span></div><div class=\"t m0 h6 ff24 fs4b fc1 sc0 ls0 ws0\" style=\"left:506.9334px; bottom:269.29303px;\"><span class=\"_ _2e9\">y</span><span class=\"ff20 fs3 wsbb\"> Singapore<span class=\"ws0\"> </span></span></div><div class=\"t m0 h6 ff26 fs4b fc1 sc0 ls0 ws0\" style=\"left:506.9334px; bottom:253.69302px;\"><span class=\"_ _2e9\">\u00ba</span><span class=\"ff20 fs3\">  Spain<span class=\"_ _2e9\"> </span></span><span class=\"ff20 fs3\"> </span></div><div class=\"t m0 h6 ff26 fs4b fc1 sc0 ls0 ws0\" style=\"left:506.9334px; bottom:238.09302px;\"><span class=\"_ _2e9\">3</span><span class=\"ff20 fs3\"> <span class=\"_ _1\"/>Tanzania<span class=\"_ _2e9\"> </span></span><span class=\"ff20 fs3\"> </span></div><div class=\"t m0 h6 ff24 fs4b fc1 sc0 ls0 ws0\" style=\"left:506.9334px; bottom:222.49301px;\"><span class=\"_ _2e9\">p</span><span class=\"ff20 fs3 wsbc\"> United  Kingdom<span class=\"ws0\"> </span></span></div><div class=\"t m0 h6 ff24 fs4b fc1 sc0 ls0 ws0\" style=\"left:506.9334px; bottom:206.89302px;\"><span class=\"_ _2e9\">q</span><span class=\"ff20 fs3 wsbc\"> United  States<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:163.33795px;\">Classi\ufb01cation<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:147.73795px;\">Subsidiaries are all the entities over which the Group has the<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:132.14185px;\">power over the investee such that the Group is able to direct  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:116.545746px;\">the relevant activities, has exposure, or rights, to variable returns<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:100.949646px;\">from its involvement with the investee and has the ability to  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:85.35355px;\"><span class=\"_ _2e9\">use its power over the investee to affect the amount of the<span class=\"_ _2e9\"> </span></span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:69.75745px;\">investor\u2019s returns.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb ff1d fs6 fc7 sc0 ls25 ws2b\" style=\"left:651.3286px; bottom:1.4145012px;\">153<span class=\"_ _49\"/><span class=\"ff1e fc5 ls0 ws0\">W<span class=\"_ _1\"/>oodside Energy Group L<span class=\"_ _1\"/>td      |<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h5 ff1f fs2 fce sc0 ls77 ws0\" style=\"bottom:927.4895px;\">E.8 <span class=\"_ _1d\"> </span>Subsidiaries (con<span class=\"_ _1\"/>t.)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:899.5344px;\">(b) Subsidiaries with material non-controlling<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:882.6409px;\">interests<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:867.0344px;\">The Group has two Australian subsidiaries with material  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:851.43835px;\">non-controlling interests (NCI).<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:818.1694px;\">Name of entity<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:158.10353px; bottom:827.9194px;\">Principal place of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:195.8801px; bottom:818.1694px;\">business<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:290.12567px; bottom:827.9194px;\">% held<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:290.12567px; bottom:818.1694px;\">by NCI<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:799.3129px;\">Burrup Facilities C<span class=\"_ _1\"/>ompany Pty Ltd<span class=\"_ _a5\"> </span>Australia<span class=\"_ _7d\"> </span>10%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:785.24365px;\">Burrup T<span class=\"_ _0\"/>rain 1 Pty Ltd<span class=\"_ _eb\"> </span>Austr<span class=\"_ _1\"/>alia<span class=\"_ _7c\"> </span>10%<span class=\"_ _2e9\"> </span></div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:763.95966px;\">The NCI in both subsidiaries is 10% held by the same parties  </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:748.3636px;\">(refer to Note E.8(a) footnote 5 for details).<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:725.3965px;\">The summarised \ufb01nancial information (including consolidation<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:709.80035px;\">adjustments but before intercompany eliminations) of<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:694.2043px;\">subsidiaries with material NCI is as follows:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:201.23648px; bottom:664.1074px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _be\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _d9\"> </span>2020</span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:194.52432px; bottom:650.0382px;\"> US$m <span class=\"_ _180\"> </span><span class=\"ff20\"> US$m <span class=\"_ _c1\"> </span> US$m<span class=\"_ _2e9\"> </span></span><span class=\"ff20\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:633.0244px;\">Burrup Facilities C<span class=\"_ _1\"/>ompany Pty Ltd<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:618.9552px;\">Current asse<span class=\"_ _1\"/>ts<span class=\"_ _2a0\"> </span><span class=\"ff1f\"> 567 <span class=\"_ _b6\"> </span></span>518 <span class=\"_ _b2\"> </span>425<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:604.8859px;\">Non-current asse<span class=\"_ _1\"/>ts<span class=\"_ _30\"> </span><span class=\"ff1f\"> 5,<span class=\"_ _1\"/>047 <span class=\"_ _d4\"> </span><span class=\"ff20\">5,038 <span class=\"_ _c4\"> </span>5,224<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:590.8264px;\">Current liabilities<span class=\"_ _100\"> </span><span class=\"ff1f\"> (68)<span class=\"_ _b6\"> </span></span>(71)<span class=\"_ _b1\"> </span>(51)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:576.7572px;\">Non-current liabilities<span class=\"_ _118\"> </span><span class=\"ff1f\"> (528)<span class=\"_ _db\"> </span></span>(528)<span class=\"_ _c6\"> </span>(571)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:559.74347px;\">Net assets<span class=\"_ _9b\"> </span><span class=\"fc1\"> 5,018 <span class=\"_ _dc\"> </span><span class=\"ff20\">4,957 <span class=\"_ _dc\"> </span><span class=\"ls47 ws82\">5<span class=\"_ _4f\"/>,027<span class=\"_ _2e9\"> </span></span></span></span><span class=\"fc1\"><span class=\"ff20\"><span class=\"ls47 ws82\"> </span></span></span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:542.7297px;\">Accumula<span class=\"_ _1\"/>ted balance of NCI <span class=\"_ _172\"> </span><span class=\"fc1\"> 502 <span class=\"_ _f5\"> </span><span class=\"ff20\">496 <span class=\"_ _b2\"> </span>503<span class=\"_ _2e9\"> </span></span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:528.66046px;\">Rev<span class=\"_ _1\"/>enue <span class=\"_ _87\"> </span><span class=\"ff1f\"> 889 <span class=\"_ _b2\"> </span></span>858 <span class=\"_ _b2\"> </span>859<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:514.5912px;\">Pro\ufb01t <span class=\"_ _3c\"> </span><span class=\"ff1f\"> 489 <span class=\"_ _e1\"> </span></span>328 <span class=\"_ _b6\"> </span>318<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:497.57745px;\">Pro\ufb01t allocat<span class=\"_ _1\"/>ed to NCI <span class=\"_ _117\"> </span><span class=\"fc1 ls6b ws84\"> 49<span class=\"_ _4f\"/> <span class=\"_ _102\"> </span></span><span class=\"ff20 fc1\">33 <span class=\"_ _f4\"> </span><span class=\"ls6c ws85\">32<span class=\"_ _2e9\"> </span></span></span><span class=\"ff20 fc1\"><span class=\"ls6c ws85\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:480.56366px;\">Dividends paid to NCI <span class=\"_ _46\"> </span><span class=\"fc1 ls6e ws87\"> (43)<span class=\"_ _b2\"> </span></span><span class=\"ff20 fc1\">(40)<span class=\"_ _c3\"> </span>(32)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:466.50418px;\">Operating <span class=\"_ _14d\"> </span><span class=\"ff1f\"> 601 <span class=\"_ _e1\"> </span></span>633 <span class=\"_ _e1\"> </span><span class=\"ls47 ws82\">652<span class=\"_ _4f\"/> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:452.43494px;\">Inv<span class=\"_ _1\"/>esting <span class=\"_ _87\"> </span><span class=\"ff1f ls6e ws87\"> (45)<span class=\"_ _b6\"> </span></span>(111)<span class=\"_ _b2\"> </span>(69)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:438.3657px;\">Financing <span class=\"_ _2a2\"> </span><span class=\"ff1f\"> (556)<span class=\"_ _f6\"> </span></span>(522)<span class=\"_ _db\"> </span>(583)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:421.35193px;\">Net increase/(<span class=\"_ _1\"/>decrease<span class=\"_ _1\"/>) in cash and cash<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:411.60193px;\">equivalents <span class=\"_ _2aa\"> </span><span class=\"fc1\"> - <span class=\"_ _fa\"> </span><span class=\"ff20\">-<span class=\"_ _17f\"> </span>-<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:394.5882px;\">Burrup T<span class=\"_ _1\"/>r<span class=\"_ _1\"/>ain 1 Pty Ltd<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:380.51895px;\">Current asse<span class=\"_ _1\"/>ts <span class=\"_ _185\"> </span><span class=\"ff1f\"> 429 <span class=\"_ _b2\"> </span></span><span class=\"ls6a ws83\">4<span class=\"_ _4f\"/>35 <span class=\"_ _b5\"> </span><span class=\"ls16 ws1b\">372<span class=\"_ _2e9\"> </span></span></span><span class=\"ls6a ws83\"><span class=\"ls16 ws1b\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:366.45944px;\">Non-current asse<span class=\"_ _1\"/>ts <span class=\"_ _19f\"> </span><span class=\"ff1f\"> 2,900 <span class=\"_ _d6\"> </span></span>2,915 <span class=\"_ _d6\"> </span>3,081<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:352.3902px;\">Current liabilities <span class=\"_ _c8\"> </span><span class=\"ff1f\"> (119)<span class=\"_ _f5\"> </span></span>(110)<span class=\"_ _54\"> </span>(103)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:338.32095px;\">Non-current liabilities <span class=\"_ _46\"> </span><span class=\"ff1f\"> (325)<span class=\"_ _d6\"> </span></span>(345)<span class=\"_ _db\"> </span>(385)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:321.3072px;\">Net assets <span class=\"_ _109\"> </span><span class=\"fc1\"> 2,885 <span class=\"_ _dc\"> </span><span class=\"ff20\">2,895 <span class=\"_ _dc\"> </span>2,965<span class=\"_ _2e9\"> </span></span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:304.29343px;\">Accumula<span class=\"_ _1\"/>ted balance of NCI <span class=\"_ _175\"> </span><span class=\"fc1\"> 289 <span class=\"_ _f5\"> </span><span class=\"ff20\">290 <span class=\"_ _c3\"> </span>297<span class=\"_ _2e9\"> </span></span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:290.22418px;\">Rev<span class=\"_ _1\"/>enue <span class=\"_ _f1\"> </span><span class=\"ff1f ls74 ws8e\"> 1,<span class=\"_ _4f\"/>471<span class=\"_ _4f\"/> <span class=\"_ _54\"> </span></span>1,421 <span class=\"_ _d6\"> </span>1,423<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:276.1647px;\">Pro\ufb01t <span class=\"_ _1a6\"> </span><span class=\"ff1f\"> 282 <span class=\"_ _be\"> </span></span>200 <span class=\"_ _f5\"> </span>208<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:259.15094px;\">Pro\ufb01t allocat<span class=\"_ _1\"/>ed to NCI <span class=\"_ _1a5\"> </span><span class=\"fc1\"> 28 <span class=\"_ _bf\"> </span><span class=\"ff20\">20 <span class=\"_ _bb\"> </span>21<span class=\"_ _2e9\"> </span></span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:242.13718px;\">Dividends paid to NCI <span class=\"_ _46\"> </span><span class=\"fc1\"> (29)<span class=\"_ _b5\"> </span><span class=\"ff20\">(27)<span class=\"_ _b1\"> </span>(13)<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:228.06793px;\">Operating <span class=\"_ _3e\"> </span><span class=\"ff1f\"> 391 <span class=\"_ _e1\"> </span></span><span class=\"ls47 ws82\">393<span class=\"_ _4f\"/> <span class=\"_ _e1\"> </span><span class=\"ls6f ws88\">47<span class=\"_ _4f\"/>3<span class=\"_ _2e9\"> </span></span></span><span class=\"ls47 ws82\"><span class=\"ls6f ws88\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:213.99869px;\">Inv<span class=\"_ _1\"/>esting <span class=\"_ _87\"> </span><span class=\"ff1f\"> (55)<span class=\"_ _c2\"> </span></span><span class=\"ls6e ws87\">(4)<span class=\"_ _f4\"> </span></span>(2)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:199.9392px;\">Financing <span class=\"_ _29b\"> </span><span class=\"ff1f\"> (336)<span class=\"_ _d6\"> </span></span>(389)<span class=\"_ _e0\"> </span><span class=\"ls6f ws88\">(<span class=\"_ _4f\"/>471<span class=\"_ _4f\"/>)<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:182.92545px;\">Net increase/(<span class=\"_ _1\"/>decrease<span class=\"_ _1\"/>) in cash and cash<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:1.8680992px; bottom:173.17545px;\">equivalents <span class=\"_ _2aa\"> </span><span class=\"fc1\"> - <span class=\"_ _fa\"> </span><span class=\"ff20\">-<span class=\"_ _17f\"> </span>-<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb7 ff1f fs55 fc0 sc0 ls0 ws0\" style=\"bottom:139.58812px;\">(c) Deed of Cross Guarantee and Closed Group<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:123.98811px;\">Woodside Energy Group Ltd and Woodside Energy Ltd<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:108.39201px;\">are parties to a Deed of Cross Guarantee under which each<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:92.79591px;\">company guarantees the debts of the other. The two entities<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"bottom:77.19982px;\">represent a Closed Group.<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:900.8447px;\">The consolidated income statement and consolidated statement<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:885.2486px;\">of \ufb01nancial position of the members of the Closed Group are set<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 h6 ff20 fs3 fc1 sc0 ls0 ws0\" style=\"left:342.73032px; bottom:869.6525px;\">out below:<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls68 ws80\" style=\"left:587.77484px; bottom:839.5522px;\">202<span class=\"_ _4f\"/>2<span class=\"_ _e1\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc1 sc0 ls0 ws0\" style=\"left:584.2656px; bottom:825.4829px;\">US$m<span class=\"_ _f7\"> </span><span class=\"ff20\">US$m<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:807.5137px;\">Closed Group Consolida<span class=\"_ _1\"/>ted Income Stat<span class=\"_ _1\"/>ement and<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:797.7637px;\">Statement of Re<span class=\"_ _1\"/>tained Earnings<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:783.69446px;\">Pro\ufb01t befor<span class=\"_ _1\"/>e tax<span class=\"_ _24f\"> </span><span class=\"ff1f\">6,586 <span class=\"_ _f6\"> </span></span>1,599<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:769.6252px;\">T<span class=\"_ _0\"/>ax expense<span class=\"_ _83\"> </span><span class=\"ff1f\">(314)<span class=\"_ _b5\"> </span></span>(50)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:755.55597px;\">Pro\ufb01t aft<span class=\"_ _1\"/>er tax<span class=\"_ _24e\"> </span><span class=\"ff1f\">6,272 <span class=\"_ _f6\"> </span></span>1,549<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:741.4867px;\">Retained earnings at the beginning of the \ufb01nancial<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:731.7367px;\">year<span class=\"_ _1a8\"> </span><span class=\"ff1f\">1,660 <span class=\"_ _bb\"> </span></span>111<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:717.6674px;\">Other compr<span class=\"_ _1\"/>ehensive income<span class=\"_ _185\"> </span><span class=\"ff1f\">1 <span class=\"_ _164\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:703.5982px;\">T<span class=\"_ _0\"/>ransfer of retained earnings t<span class=\"_ _1\"/>o distributable pro\ufb01ts<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:693.8482px;\">reserv<span class=\"_ _1\"/>e<span class=\"_ _11\"> </span><span class=\"ff1f\">(5,553)<span class=\"_ _fa\"> </span></span>-<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:679.77893px;\">Dividends<span class=\"_ _161\"> </span><span class=\"ff1f\">(1,0<span class=\"_ _1\"/>18)<span class=\"_ _fa\"> </span><span class=\"ff20\">-<span class=\"_ _2e9\"> </span></span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:665.7097px;\">Retained earnings at the end of the \ufb01nancial y<span class=\"_ _1\"/>ear<span class=\"_ _c7\"> </span><span class=\"ff1f\">1<span class=\"_ _4f\"/>,362 <span class=\"_ _d6\"> </span></span>1,660<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:645.01044px;\">Closed Group Consolida<span class=\"_ _1\"/>ted Statement of Financial<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:635.26044px;\">Position<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:621.19116px;\">Current assets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:607.12195px;\">Cash and cash equivalents<span class=\"_ _29d\"> </span><span class=\"ff1f\">116 <span class=\"_ _b6\"> </span></span>160<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:593.06244px;\">Receiv<span class=\"_ _1\"/>ables<span class=\"_ _2a1\"> </span><span class=\"ff1f ls2a ws36\">675 <span class=\"_ _c3\"> </span></span>948<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:578.99316px;\">Inv<span class=\"_ _1\"/>entories<span class=\"_ _a3\"> </span><span class=\"ff1f\">56 <span class=\"_ _47\"> </span></span><span class=\"ls6f ws88\">47<span class=\"_ _2e9\"> </span></span><span class=\"ls6f ws88\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:564.92395px;\">Other \ufb01nancial assets<span class=\"_ _213\"> </span><span class=\"ff1f\">653 <span class=\"_ _c0\"> </span></span>17<span class=\"_ _1\"/>3<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:550.8547px;\">Other assets<span class=\"_ _214\"> </span><span class=\"ff1f\">21 <span class=\"_ _47\"> </span></span>22<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:533.84094px;\">T<span class=\"_ _0\"/>otal current assets<span class=\"_ _2aa\"> </span><span class=\"fc1\">1,521 <span class=\"_ _f6\"> </span><span class=\"ff20\">1,350<span class=\"_ _2e9\"> </span></span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:516.8272px;\">Non-current assets<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:502.75793px;\">Receiv<span class=\"_ _1\"/>ables<span class=\"_ _20c\"> </span><span class=\"ff1f\">2,171 <span class=\"_ _e3\"> </span></span><span class=\"ls6f ws88\">476<span class=\"_ _2e9\"> </span></span><span class=\"ls6f ws88\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:488.68866px;\">Other \ufb01nancial assets<span class=\"_ _16b\"> </span><span class=\"ff1f\">57<span class=\"_ _0\"/>,844 <span class=\"_ _e5\"> </span><span class=\"ff20\">36,432<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:474.61945px;\">Exploration and e<span class=\"_ _1\"/>valua<span class=\"_ _1\"/>tion assets<span class=\"_ _8d\"> </span><span class=\"ff1f\">28 <span class=\"_ _15e\"> </span></span>31<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:460.5502px;\">Oil and gas properties<span class=\"_ _fb\"> </span><span class=\"ff1f\">2,424 <span class=\"_ _181\"> </span></span>2,930<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:446.4907px;\">Deferred tax as<span class=\"_ _1\"/>sets<span class=\"_ _273\"> </span><span class=\"ff1f\">421 <span class=\"_ _e3\"> </span></span><span class=\"ls7e ws99\">57<span class=\"_ _4f\"/>9<span class=\"_ _2e9\"> </span></span><span class=\"ls7e ws99\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:432.42145px;\">Lease assets<span class=\"_ _161\"> </span><span class=\"ff1f\">315 <span class=\"_ _b1\"> </span></span>319<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:418.3522px;\">Other assets<span class=\"_ _2ab\"> </span><span class=\"ff1f ls70 ws89\">67 <span class=\"_ _15f\"> </span></span>13<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:401.33844px;\">T<span class=\"_ _0\"/>otal non-current assets<span class=\"_ _186\"> </span><span class=\"fc1\">63,2<span class=\"_ _1\"/>70 <span class=\"_ _180\"> </span><span class=\"ff20\">40<span class=\"_ _1\"/>,780<span class=\"_ _2e9\"> </span></span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:384.32468px;\">T<span class=\"_ _0\"/>otal assets<span class=\"_ _8a\"> </span><span class=\"fc1\">64,791 <span class=\"_ _e2\"> </span><span class=\"ff20\">42,<span class=\"_ _1\"/>130<span class=\"_ _2e9\"> </span></span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:367.31094px;\">Current liabilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:353.2417px;\">Pay<span class=\"_ _1\"/>ables<span class=\"_ _2ac\"> </span><span class=\"ff1f\">483 <span class=\"_ _b1\"> </span></span>186<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:339.1822px;\">Other \ufb01nancial liabilities<span class=\"_ _167\"> </span><span class=\"ff1f ls2a ws36\">675<span class=\"_ _4f\"/> <span class=\"_ _b2\"> </span></span>409<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:325.11295px;\">Pro<span class=\"_ _1\"/>visions<span class=\"_ _11\"> </span><span class=\"ff1f\">328 <span class=\"_ _c3\"> </span></span>320<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:311.0437px;\">T<span class=\"_ _0\"/>ax pay<span class=\"_ _1\"/>able<span class=\"_ _203\"> </span><span class=\"ff1f\">1,556 <span class=\"_ _b6\"> </span></span><span class=\"ls7e ws99\">357<span class=\"_ _4f\"/> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:296.9842px;\">Lease liabilities<span class=\"_ _d1\"> </span><span class=\"ff1f\">36 <span class=\"_ _47\"> </span></span>23<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:282.91495px;\">Other liabilities<span class=\"_ _2a7\"> </span><span class=\"ff1f\">38 <span class=\"_ _f4\"> </span></span>34<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:265.90118px;\">T<span class=\"_ _0\"/>otal current liabilities<span class=\"_ _85\"> </span><span class=\"fc1\">3,<span class=\"_ _1\"/>116 <span class=\"_ _d9\"> </span><span class=\"ff20\">1,329<span class=\"_ _2e9\"> </span></span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:248.88745px;\">Non-current liabilities<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:234.81818px;\">Pay<span class=\"_ _1\"/>ables<span class=\"_ _161\"> </span><span class=\"ff1f\">25,52<span class=\"_ _1\"/>4 <span class=\"_ _d4\"> </span><span class=\"ff20\">27<span class=\"_ _2\"/>,104<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:220.74893px;\">Other \ufb01nancial liabilities<span class=\"_ _158\"> </span><span class=\"ff1f\">68 <span class=\"_ _c0\"> </span></span>153<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:206.68944px;\">Pro<span class=\"_ _1\"/>visions<span class=\"_ _13c\"> </span><span class=\"ff1f\">1,<span class=\"_ _1\"/>121 <span class=\"_ _f5\"> </span><span class=\"ff20\">1,<span class=\"_ _1\"/>179<span class=\"_ _2e9\"> </span></span></span><span class=\"ff1f\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:192.6202px;\">Lease liabilities<span class=\"_ _8a\"> </span><span class=\"ff1f\">325 <span class=\"_ _c3\"> </span></span>360<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:178.55093px;\">Other liabilities<span class=\"_ _1a2\"> </span><span class=\"ff1f\">11 <span class=\"_ _15e\"> </span></span>15<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:161.53719px;\">T<span class=\"_ _0\"/>otal non-current liabilities<span class=\"_ _29c\"> </span><span class=\"fc1\">27<span class=\"_ _0\"/>,049 <span class=\"_ _181\"> </span><span class=\"ff20\">28,811<span class=\"_ _2e9\"> </span></span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:144.52344px;\">T<span class=\"_ _0\"/>otal liabilities<span class=\"_ _145\"> </span><span class=\"fc1\">30,<span class=\"_ _1\"/>165 <span class=\"_ _af\"> </span><span class=\"ff20\">30,<span class=\"_ _1\"/>140<span class=\"_ _2e9\"> </span></span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:127.50969px;\">Net assets<span class=\"_ _2a5\"> </span><span class=\"fc1\">34,626 <span class=\"_ _d4\"> </span><span class=\"ff20\">11,990<span class=\"_ _2e9\"> </span></span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 hbb ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:110.49594px;\">Equity<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:96.43645px;\">Issued and fully paid shares<span class=\"_ _e9\"> </span><span class=\"ff1f\">29,001 <span class=\"_ _d4\"> </span></span>9,409<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:82.36719px;\">Reserv<span class=\"_ _1\"/>ed shares<span class=\"_ _5c\"> </span><span class=\"ff1f\">(38)<span class=\"_ _b5\"> </span></span>(30)<span class=\"_ _2e9\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:68.29794px;\">Other reserv<span class=\"_ _1\"/>es<span class=\"_ _24e\"> </span><span class=\"ff1f\">4,301 <span class=\"_ _b1\"> </span></span><span class=\"ls6a ws83\">9<span class=\"_ _4f\"/>51<span class=\"_ _2e9\"> </span></span><span class=\"ls6a ws83\"> </span></div><div class=\"t m0 hb8 ff20 fs4b fc1 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:54.23844px;\">Retained earnings<span class=\"_ _253\"> </span><span class=\"ff1f\">1,362 <span class=\"_ _db\"> </span></span>1,660<span class=\"_ _2e9\"> </span> </div><div class=\"t m0 hb8 ff1f fs4b fc0 sc0 ls0 ws0\" style=\"left:343.75836px; bottom:37.224693px;\">T<span class=\"_ _0\"/>otal equity<span class=\"_ _254\"> </span><span class=\"fc1\">34,626 <span class=\"_ _d4\"> </span><span class=\"ff20\">11,990</span></span><span class=\"fc1\"><span class=\"ff20\"> </span></span></div><div class=\"t m0 h9b ff20 fs52 fce sc0 ls0 ws0\" style=\"bottom:981.8155px;\">Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">E. Other it<span class=\"_ _1\"/>ems<span class=\"_ _2e9\"> </span></span></div><div class=\"t m0 h6 ff20 fs3 fc7 sc0 ls0 ws0\" style=\"bottom:964.0904px;\">for the y<span class=\"_ _1\"/>ear ended 31 December 2022<span class=\"_ _2e9\"> </span></div>E.9 <span class=\"_ _1d\"> </span>Other acc<span class=\"_ _1\"/>ounting policies<span class=\"_ _2e9\"> </span>(a) Summary of other signi\ufb01cant accounting<span class=\"_ _2e9\"> </span>policies<span class=\"_ _2e9\"> </span>Australia tax consolidation<span class=\"_ _2e9\"> </span>The parent and its wholly owned Australian controlled entities<span class=\"_ _2e9\"> </span>have elected to enter a tax consolidation, with Woodside Energy<span class=\"_ _2e9\"> </span>Group Ltd as the head entity of the tax consolidated group. The members of the Australian tax consolidated group are<span class=\"_ _2e9\"> </span>identi\ufb01ed in Note E.8(a).<span class=\"_ _2e9\"> </span>The tax expense/bene\ufb01t, deferred tax liabilities and deferred tax<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">assets arising from temporary differences of the members of the<span class=\"_ _2e9\"> </span></span>tax consolidated group are recognised in the separate \ufb01nancial<span class=\"_ _2e9\"> </span>statements of the members of the tax consolidated group, using<span class=\"_ _2e9\"> </span>the stand-alone approach.<span class=\"_ _2e9\"> </span>Entities within the tax consolidated group have entered into a<span class=\"_ _2e9\"> </span>tax funding arrangement and a tax sharing agreement with the<span class=\"_ _2e9\"> </span>head entity. Under the tax funding agreement, Woodside Energy<span class=\"_ _2e9\"> </span>Group Ltd and each of the entities in the tax consolidated group<span class=\"_ _2e9\"> </span>have agreed to pay or receive a tax equivalent payment to or<span class=\"_ _2e9\"> </span>from the head entity, based on the current tax liability or current<span class=\"_ _2e9\"> </span>tax asset of the entity.<span class=\"_ _2e9\"> </span>The tax sharing agreement entered into between members<span class=\"_ _2e9\"> </span>of the tax consolidated group provides for the determination<span class=\"_ _2e9\"> </span>of the allocation of income tax liabilities between the entities,<span class=\"_ _2e9\"> </span>should the head entity default on its tax payment obligations.<span class=\"_ _2e9\"> </span>No amounts have been recognised in the \ufb01nancial statements in<span class=\"_ _2e9\"> </span>respect of this agreement as payment of any amounts under the<span class=\"_ _2e9\"> </span>tax sharing agreement is considered remote.<span class=\"_ _2e9\"> </span>US tax consolidation<span class=\"_ _2e9\"> </span>Woodside Energy USA Operations Inc and its wholly owned<span class=\"_ _2e9\"> </span>USA controlled entities have elected to \ufb01le a consolidated tax<span class=\"_ _2e9\"> </span>return, with Woodside Energy USA Operations Inc as the parent<span class=\"_ _2e9\"> </span>of the tax consolidated group.<span class=\"_ _2e9\"> </span>The tax expense/bene\ufb01t, deferred tax liabilities and deferred tax<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">assets arising from temporary differences of the members of the<span class=\"_ _2e9\"> </span></span>tax consolidated group are computed on a separate company<span class=\"_ _2e9\"> </span>basis.<span class=\"_ _2e9\"> </span>Entities within the tax consolidated group have entered into a<span class=\"_ _2e9\"> </span>tax sharing agreement. Under the tax sharing agreement, the<span class=\"_ _2e9\"> </span>tax liability for the consolidated group or the utilisation of tax<span class=\"_ _2e9\"> </span>attributes are settled periodically between the members of<span class=\"_ _2e9\"> </span>the group. No amounts have been recognised in the \ufb01nancial<span class=\"_ _2e9\"> </span>statements in respect of this agreement as payment of any<span class=\"_ _2e9\"> </span>amounts under the tax sharing agreement is considered remote.<span class=\"_ _2e9\"> </span>(b) New and amended accounting standards and<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">interpretations issued but not yet effective<span class=\"_ _2e9\"> </span></span>A number of new standards, amendments of standards and<span class=\"_ _2e9\"> </span>interpretations have recently been issued but are not yet<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">effective and have not been adopted by the Group as at the<span class=\"_ _2e9\"> </span></span>\ufb01nancial reporting date.<span class=\"_ _2e9\"> </span>The Group has reviewed these standards and interpretations<span class=\"_ _2e9\"> </span>and has determined that none of the new or amended standards<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">will signi\ufb01cantly affect the Group\u2019s accounting policies, \ufb01nancial<span class=\"_ _2e9\"> </span></span>position or performance.<span class=\"_ _2e9\"> </span>(c) New and amended accounting standards and<span class=\"_ _2e9\"> </span>interpretations adopted<span class=\"_ _2e9\"> </span>As of 1 January 2022, the Group adopted AASB 2020-3<span class=\"_ _2e9\"> </span>Amendments to AASs \u2013 Annual Improvements 2018-2020 and<span class=\"_ _2e9\"> </span>Other Amendments including:<span class=\"_ _2e9\"> </span>\u2022 <span class=\"_ _4b\"> </span>Amendments to AASB 3 Reference to the Conceptual<span class=\"_ _2e9\"> </span>Framework<span class=\"_ _2e9\"> </span>\u2022 <span class=\"_ _4b\"> </span>Amendments to AASB 9 Fees in the \u201810 per cent\u2019 Test for<span class=\"_ _2e9\"> </span>Derecognition of Financial Liabilities<span class=\"_ _2e9\"> </span>\u2022 <span class=\"_ _4b\"> </span>Amendments to AASB 137 Onerous Contracts \u2013 Costs of<span class=\"_ _2e9\"> </span>Ful\ufb01lling a Contract These amendments did not impact the \ufb01nancial statements of the Group.<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">A number of other new standards are also effective from </span><span class=\"_ _2e9\">1 January 2022 but they do not have a material effect on the<span class=\"_ _2e9\"> </span></span>Group\u2019s \ufb01nancial statements.<span class=\"_ _2e9\"> </span>Not<span class=\"_ _1\"/>es to the \ufb01nancial s<span class=\"_ _1\"/>tat<span class=\"_ _1\"/>ements <span class=\"fs2 fc1c\">E. Other it<span class=\"_ _1\"/>ems<span class=\"_ _2e9\"> </span></span>for the y<span class=\"_ _1\"/>ear ended 31 December 2022",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfNotesAndOtherExplanatoryInformationExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-2": {
   "value": "Following the approval by shareholders at the Annual General  Meeting on 19 May 2022, Woodside Petroleum Ltd has  registered the change of company name to Woodside Energy  Group Ltd.",
   "dimensions": {
    "concept": "ifrs-full:ExplanationOfChangeInNameOfReportingEntityOrOtherMeansOfIdentificationFromEndOfPrecedingReportingPeriod",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-3": {
   "value": "Woodside Energy Group Ltd",
   "dimensions": {
    "concept": "ifrs-full:NameOfReportingEntityOrOtherMeansOfIdentification",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-4": {
   "value": "for-pro\ufb01t entity limited by shares",
   "dimensions": {
    "concept": "ifrs-full:LegalFormOfEntity",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-749": {
   "value": "by shares, incorporated and domiciled in Australia. Its shares  ",
   "dimensions": {
    "concept": "ifrs-full:DomicileOfEntity",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-5": {
   "value": "Australia",
   "dimensions": {
    "concept": "ifrs-full:CountryOfIncorporation",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-754": {
   "value": "Statement of compliance The \ufb01nancial statements are general purpose \ufb01nancial  statements, which have been prepared in accordance with  the requirements of the Corporations Act 2001, Australian  Accounting Standards and other authoritative pronouncements  of the Australian Accounting Standards Board (AASB). The  \ufb01nancial statements comply with the International Financial  Reporting Standards (IFRS) as issued by the International  Accounting Standards Board. They also include additional  disclosures required for foreign registrants by the United States  Securities and Exchange Commission (US SEC). Subsequent to the merger with BHPP, BHPP\u2019s accounting  policies have been aligned with the Group. The Group\u2019s  accounting policies are consistent with those disclosed in the  Group\u2019s 2021 Financial Statements except for new policies  applicable in 2022. Adoption of new or amended standards and  interpretations effective 1 January 2022 did not result in any  signi\ufb01cant changes to the Group\u2019s accounting policies. Estimates have been revised, where required, to re\ufb02ect current  market conditions including the impact of COVID-19 and  climate change. Updated assumptions used for impairment  assessments and the measurement of onerous contracts are  disclosed in Notes B.4 and D.5 respectively; these assumptions  could change in the future. New estimates and judgements  for signi\ufb01cant transactions during the period including the  recognition of goodwill as a result of the business combination,  the allocation of goodwill to the Group\u2019s cash generating units,  and the sell-down of Train 2 are disclosed in Notes B.5, B.4 and  B.7 respectively. ",
   "dimensions": {
    "concept": "ifrs-full:StatementOfIFRSCompliance",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-755": {
   "value": "Currency The functional and presentation currency of Woodside and all its  material subsidiaries is the US dollar. Transactions in foreign currencies are initially recorded in the  functional currency of the transacting entity at the exchange  rates ruling at the date of transaction. Monetary assets and  liabilities denominated in foreign currencies at the reporting  date are translated at the rates of exchange ruling at that date.  Exchange differences in the consolidated \ufb01nancial statements  are taken to the income statement. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForForeignCurrencyTranslationExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-790": {
   "value": "The functional and presentation currency of Woodside and all its  material subsidiaries is the US dollar. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFunctionalCurrencyExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-756": {
   "value": "Rounding of amounts The amounts contained in these \ufb01nancial statements have been  rounded to the nearest million dollars under the option available  to the Group under Australian Securities and Investments  Commission (ASIC) Corporations (Rounding in Financial/ Directors\u2019 Reports) Instrument 2016/191 dated 24 March 2016,  unless otherwise stated. ",
   "dimensions": {
    "concept": "woodsideenergygroupltd:DisclosureOfRoundingOfAmounts",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00"
   }
  },
  "fact-757": {
   "value": "Basis of preparation The \ufb01nancial statements have been prepared on a historical cost  basis, except for derivative \ufb01nancial instruments and certain  other \ufb01nancial assets and \ufb01nancial liabilities, which have been  measured at fair value or amortised cost adjusted for changes  in fair value attributable to the risks that are being hedged in  effective hedge relationships. Where not carried at fair value, if  the carrying value of \ufb01nancial assets and \ufb01nancial liabilities does  not approximate their fair value, the fair value has been included  in the notes to the \ufb01nancial statements. The \ufb01nancial statements comprise the \ufb01nancial position and  results of the Group as at and for the year ended 31 December  2022 (refer to Note E.8).  Subsidiaries are fully consolidated from the date on which  control is obtained by the Group and cease to be consolidated  from the date at which the Group ceases to have control. The subsidiaries of the Group apply the same reporting period  and accounting policies as the parent company in their \ufb01nancial  statements. All intercompany balances and transactions,  including unrealised pro\ufb01ts and losses arising from intra-group  transactions, have been eliminated in full. Non-controlling interests are allocated their share of the net  pro\ufb01t after tax in the consolidated income statement and  their share of other comprehensive income net of tax in the  consolidated statement of comprehensive income, and are  presented within equity in the consolidated statement of  \ufb01nancial position, separately from parent shareholders\u2019 equity. The consolidated \ufb01nancial statements provide comparative  information in respect of the previous periods. Where required,  a reclassi\ufb01cation of items in the \ufb01nancial statements of the  previous periods has been made in accordance with the  classi\ufb01cation of items in the \ufb01nancial statements of the  current period. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBasisOfPreparationOfFinancialStatementsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-758": {
   "value": "Climate change and energy transition Climate considerations Woodside has considered the impact of climate and the energy  transition in assessing the carrying value of its assets and  liabilities. This note describes climate-related assumptions that  underpin key areas of the \ufb01nancial statements and the potential  short- and long-term impacts differing scenarios could have on  the \ufb01nancial results and \ufb01nancial position of Woodside.  Climate change and energy transition (cont.) Financial planning and assumptions Woodside considers a range of climate and macroeconomic scenarios to help benchmark our long-term price assumptions and inform our decision making to ensure we maintain a resilient \ufb01nancial position. The assumptions applied in assessing amounts within the \ufb01nancial statements are in each case calculated in accordance with the requirements of the applicable accounting standards. Our long-term price assumptions re\ufb02ect management\u2019s current \u2018best estimate\u2019 scenario in which global governments pursue decarbonisation as well as other goals such as energy security and economic development. All price assumptions consider current legislation in the locations where Woodside operates and place some weight on scenarios in which the transition to a low carbon energy system is sufficiently rapid to meet the goals of the Paris Agreement, as well as scenarios in which the transition is not, or may not be, sufficiently rapid. They also place some weight on a range of other assumptions which can drive prices (e.g. in\ufb02ation) and which are not related to the Paris goals. Woodside\u2019s facilities are subject to physical risks such as oceanic conditions and are located in regions that experience tropical cyclones, hurricanes and high ambient temperatures. Woodside has signi\ufb01cant experience designing and operating facilities located in harsh environments. Woodside notes that the high degree of uncertainty around the nature, timing and magnitude of climate-related risks, and the uncertainty as to how the energy transition will evolve, makes it difficult to determine and disclose the risks and their potential impacts with precision. Woodside continues to monitor the uncertainty around climate change risks and will revise commodity and carbon pricing assumptions accordingly. Oil and gas investment cases include a carbon price assumption which takes into consideration uncertainty around the impact of climate change. Commodity pricing assumptions are key value drivers with greater signi\ufb01cance to assets and liabilities than carbon pricing. Impairment of exploration and evaluation, oil and gas properties and goodwill In accordance with IFRS, elements of Woodside\u2019s \ufb01nancial statements are based on reasonable and supportable assumptions that represent management\u2019s current best estimate of the range of economic conditions that may exist in the foreseeable future. The estimation of recoverable amounts for impairment testing includes estimating what an independent market participant would pay to acquire the asset as at the reporting date. Market participants will be guided by their own views on future economic and technical conditions and therefore Woodside considers a range of data sources in determining a future price forecast, including industry and market benchmarks along with asset sales transaction data. Price forecasts are adjusted for premiums and discounts based on the nature and quality of the product. Brent oil price estimates have considered the impacts of climate policies along with other factors such as industry investment and cost trends. There remains signi\ufb01cant uncertainty around how society will respond to the climate challenge. The energy transition is expected to bring volatility and there is uncertainty as to how commodity prices will develop over the medium and long term. The IEA\u2019s World Energy Outlook 2022 (WEO) explores three main climate change scenarios. The IEA scenarios are not predictions and the IEA does not have a single view on the future of the energy system. There is signi\ufb01cant uncertainty as to whether any of these scenarios will eventuate. Because Woodside considers what a market participant would pay to acquire an asset in assessing impairments, these external scenarios are not necessarily consistent with the pricing assumptions used for the Group\u2019s impairment assessment as disclosed in Table A below and Note B.4 Impairment of exploration and evaluation, oil and gas properties and goodwill. The WEO explores three main scenarios1: \u2022  The Net Zero Emissions by 2050 Scenario (NZE) \u2022  The Announced Pledges Scenario (APS) \u2022  The Stated Policies Scenario (STEPS) Table A: Average real terms 2022 oil price (US$/bbl, Brent)2, North Asian LNG price (US$/MMbtu)2 and carbon price (US$/tCO\u2082-e)3 consistent with IEA dataset compared against Woodside\u2019s assumptions: Average Brent (RT US$/bbl) 2023-2026 2027-2031 2032-2036 2037-2040 NZE 59 38 33 31 APS 88 70 65 65 STEPS 92 85 85 88 Woodside 75 70 70 70 Average North Asian LNG (RT US$/MMbtu) 2023-2026 2027-2031 2032-2036 2037-2040 NZE 18 6 6 6 APS 20 9 9 9 STEPS 21 11 11 11 Woodside 23 9 9 9 Average Carbon (RT US$/tonne) 2023-2026 2027-2031 2032-2036 2037-2040 NZE 100 135 169 199 APS 98 130 154 172 STEPS 80 80 80 80 Woodside 80 80 80 80 1.  IEA 2022. \u2018World Energy Outlook 2022\u2019. All rights reserved. 2.  Based on data from IEA 2022. \u2018World Energy Outlook 2022\u2019 as modi\ufb01ed by Woodside analysis. Woodside used interpolation techniques to estimate Brent annual price points in between the years for which the IEA disclosed price points. For gas pricing assumptions all non-contracted LNG volumes were assessed at IEA\u2019s Japan import price, as a proxy for North Asian LNG spot price. Woodside used interpolation techniques to estimate annual gas price points in between the years for which the IEA disclosed prices. For oil linked LNG contracts, prices are derived from the Brent forecasts and the terms of the contracts. 3.  Based on data from IEA 2022. \u2018World Energy Outlook 2022\u2019 as modi\ufb01ed by Woodside analysis. The IEA only provide carbon prices from 2030 onwards. As a result, Woodside used a starting point of US$80/tCO\u2082-e consistent with internal carbon cost pricing. Woodside used the 2022 starting price point and the IEA\u2019s published 2030 and 2040 carbon prices for each scenario to interpolate annual price points through to 2040. Climate change and energy transition (cont.) Impairment of exploration and evaluation, oil and gas properties and goodwill (cont.) Refer to Note B.4 for the sensitivity analysis performed on Woodside\u2019s Brent oil pricing assumptions and the potential impact on the carrying value of Woodside\u2019s non-current assets. The benchmarked pricing above has limitations and is based on a wide range of assumptions. The impact of the benchmark pricing assumptions could be managed by decisions Woodside could make in response such as acquisitions, divestments or cost reductions as well as other consequential changes. The scenarios must therefore not be interpreted as Woodside\u2019s investment guidance. These are scenarios, not forecasts, and no likelihood is assigned to any of these scenarios eventuating. Impact on remaining life of assets Oil and gas properties relating to transferred exploration and evaluation and offshore plant and equipment are depreciated using the unit of production basis over either proved or proved plus probable reserves. The energy transition may result in changes to the expected useful life of oil and gas properties and economically recoverable reserves and resources thereby accelerating depreciation charges or resulting in an impairment. Restoration and other provisions The energy transition may result in restoration activities occurring earlier than expected. 54% (2021: 65%) of the Group\u2019s non-current restoration liabilities are expected to be settled more than 10 years in the future. Restoration cost estimates require judgemental assumptions regarding removal date, environmental legislation and regulations and the extent of restoration activities required. These cost estimates may change in the future, as a result of increased regulatory scrutiny and the energy transition. Woodside continues to monitor the uncertainty around climate change risks to assess if additional changes to restoration provisions should be recognised. Onerous contracts Closure or early termination of activities may lead to supply contracts becoming onerous. As at 31 December 2022, the Corpus Christi contract is expected to return a positive value and on this basis the onerous contract provision has been reversed to nil (2021: $214 million). This and other contractual arrangements could be impacted by adverse market conditions arising from climate-related factors. Deferred tax assets The Group has determined that it is probable that sufficient future taxable income will be available to utilise the deferred tax assets relating to carry forward unused tax losses and credits recognised as at 31 December 2022. The recoverability of deferred tax assets is dependent on the Group\u2019s future taxable income which can be impacted by the uncertainty of commodity and carbon pricing. Regulatory environment Regulation of climate-related emissions can change over time. Woodside is not currently aware of speci\ufb01c proposals that would materially change the assumptions underpinning the \ufb01nancial statements. ",
   "dimensions": {
    "concept": "woodsideenergygroupltd:DisclosureOfClimateChangeAndEnergyTransition",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-759": {
   "value": "Financial and capital risk management The Board of Directors has overall responsibility for the establishment and oversight of the Group\u2019s risk management framework, including review and approval of the Group\u2019s risk management strategy, policy and key risk parameters. The Board of Directors and the Audit and Risk Committee have oversight of the Group\u2019s internal control system and risk management process, including oversight of the internal audit function. The Group\u2019s management of \ufb01nancial and capital risks is aimed  at ensuring that available capital, funding and cash \ufb02ows are sufficient to: \u2022  meet the Group\u2019s \ufb01nancial commitments as and when they fall due; \u2022  maintain the capacity to fund its committed project developments; \u2022  pay a reasonable dividend; and \u2022  maintain a long-term credit rating of not less than \u2018investment grade\u2019. The Group monitors and tests its forecast \ufb01nancial position against these criteria and, in general, will undertake hedging activity when necessary to ensure that these objectives are achieved. Other circumstances that may lead to hedging include the management of exposures relating to trading activities. It is, and has been throughout the period, the Group Treasury policy that no speculative trading in \ufb01nancial instruments shall be undertaken. Refer to Section 3.8 Risk Factors for more information on the Group\u2019s objectives, policies and processes for managing \ufb01nancial risk. The below risks arise in the normal course of the Group\u2019s business.  Risk information can be found in the following sections: Section A Commodity price risk management Page 109 Section A Foreign exchange risk management Page 109 Section C Capital risk management Page 132 Section C Liquidity risk management Page 132 Section C Interest rate risk management Page 132 Section D Credit risk management Page 136 Key \ufb01nancial and capital risks in this section Commodity price risk management The Group\u2019s revenue is exposed to commodity price \ufb02uctuations through the sale of hydrocarbons. Commodity price risks are measured by monitoring and stress testing the Group\u2019s forecast \ufb01nancial position to sustained periods of low oil and gas prices.  This analysis is regularly performed on the Group\u2019s portfolio and as required for discrete projects and transactions. The Group\u2019s management of commodity price risk includes the use of commodity derivatives to hedge its exposure (refer to Note D.6). The hedged exposure includes oil-linked revenue related to produced volumes and revenues derived from trading operations. Commodity derivatives protect the Group against downside price risk within its strategic and trading portfolio. As at the reporting date, the Group held hedging \ufb01nancial instruments with a net liability carrying value of $557 million (2021:  $431 million) exposed to commodity price risk. An increase in relevant commodity prices of 10% would increase the instruments\u2019 net liability by $219 million, the effect of which would be recognised within reserves and/or the income statement in accordance with hedge accounting application. A 10% decrease would have the same but opposite effect. This analysis assumes that all other variables remain constant (including the price on underlying physical exposures). Foreign exchange risk management Foreign exchange risk arises from future commitments, \ufb01nancial assets and \ufb01nancial liabilities that are not denominated in US dollars.  The majority of the Group\u2019s revenue is denominated in US dollars. The Group is exposed to foreign currency risk arising from operating and capital expenditure incurred in currencies other than US dollars, particularly Australian dollars. The Group\u2019s management of foreign exchange risk relating to capital expenditure includes the use of forward exchange contract derivatives to hedge its exposure (refer to Note D.6). As at the reporting date, the Group held hedging \ufb01nancial instruments with a net liability carrying value of $17 million (2021: net asset carrying value of $10 million) exposed to foreign exchange risk. Measuring the exposure to foreign exchange risk is achieved by regularly monitoring and performing sensitivity analysis on the  Group\u2019s \ufb01nancial position. A reasonably possible change in the exchange rate of the US dollar to the Australian dollar (+12%/-12% (2021: +12%/-12%)), with all other variables held constant, would not have a material impact on the Group\u2019s equity or the income statement. Refer to Notes C1, C2, D2, D4 and D7 for details of the denominations of cash and cash equivalents, interest-bearing liabilities, receivables, payables and lease liabilities held at 31 December 2022. The Group entered into foreign exchange forward contracts to \ufb01x the Australian dollar to US dollar exchange rate in relation to a portion of the Australian dollar denominated capital expenditure incurred or expected to be incurred under the Scarborough development from 2022 to 2025 (refer to Note D.6). In order to hedge the foreign exchange risk and interest rate risk (refer to Section C) of a Swiss Franc (CHF) denominated medium term note, Woodside holds a number of cross-currency interest rate swaps (refer to Notes C.2 and D.6). The aim of these investments is to convert the \ufb01xed interest CHF bond into variable interest US dollar debt. Key \ufb01nancial and capital risks in this section Capital risk management Group Treasury is responsible for the Group's capital management including cash, debt and equity. Capital management is undertaken to ensure that a secure, cost-effective and \ufb02exible supply of funds is available to meet the Group\u2019s operating and capital expenditure requirements. A stable capital base is maintained from which the Group can pursue its growth aspirations, whilst maintaining a \ufb02exible capital structure that allows access to a range of debt and equity markets to both draw upon and repay capital. The Dividend Reinvestment Plan (DRP) was approved by shareholders at the Annual General Meeting in 2003 for activation as required to fund future growth. The DRP was reactivated in 2019 and suspended by the Board of Directors on 27 February 2023. A range of \ufb01nancial metrics are monitored, including gearing and cash \ufb02ow leverage, and Treasury policy breaches and exceptions. Liquidity risk management Liquidity risk arises from the \ufb01nancial liabilities of the Group and the Group\u2019s subsequent ability to meet its obligations to repay \ufb01nancial liabilities as and when they fall due. The liquidity position of the Group is managed to ensure sufficient liquid funds are available to meet its \ufb01nancial commitments in a timely and cost-effective manner. The Group\u2019s liquidity is continually reviewed, including cash \ufb02ow forecasts to determine the forecast liquidity position and maintain appropriate liquidity levels. At 31 December 2022, the Group had a total of $10,239 million (2021: $6,125 million) of available undrawn facilities and cash at its disposal. The maturity pro\ufb01le of interest-bearing liabilities is disclosed in Note C.2, trade and other payables are disclosed in Note D.4 and lease liabilities are disclosed in Note D.7. Financing facilities available to the Group are disclosed in Note C.2. Interest rate risk management Interest rate risk is the risk that the Group\u2019s \ufb01nancial position will \ufb02uctuate due to changes in market interest rates. The Group\u2019s exposure to the risk of changes in market interest rates relates primarily to \ufb01nancial instruments with \ufb02oating interest rates including long-term debt obligations, cash and short-term deposits. The Group manages its interest rate risk by maintaining an appropriate mix of \ufb01xed and \ufb02oating rate debt. To manage the ratio of \ufb01xed rate debt to \ufb02oating rate debt, the Group may enter into interest rate swaps. The Group holds cross-currency interest rate swaps to hedge the foreign exchange risk (refer to Section A) and interest rate risk of the CHF denominated medium term note. The Group also holds interest rate swaps to hedge the interest rate risk associated with the $600 million syndicated facility. Refer to Notes C.2 and D.6 for further details. At the reporting date, the Group was exposed to various benchmark interest rates that were not designated in cash \ufb02ow hedges, primarily through $6,143 million (2021: $2,962 million) on cash and cash equivalents, $83 million (2021: $367 million) on interest- bearing liabilities (excluding transaction costs), $167 million of other \ufb01nancial assets (2021: nil) and $5 million (2021: $9 million) on cross-currency interest rate swaps. A reasonably possible change in the USD London Interbank Offered Rate (USD LIBOR) (+1.5%/-1.5% (2021: +1.0%/-1.0%)), with all variables held constant, would not have a material impact on the Group\u2019s equity or the income statement in the current period. The transition of a number of the Group\u2019s \ufb01nancial liabilities from USD LIBOR to SOFR during the year ended 31 December 2022 did not result in a material impact to the Group. The Group\u2019s Treasury function continues to execute the transition of the remaining \ufb01nancial instruments from current benchmark rates to alternative benchmark rates. Key \ufb01nancial and capital risks in this section Credit risk management Credit risk is the risk that a counterparty will not meet its obligation under a \ufb01nancial instrument or customer contract, leading to a \ufb01nancial loss to the Group. Credit risk arises from the \ufb01nancial assets of the Group, which comprise trade and other receivables, loans receivables and deposits with banks and \ufb01nancial institutions. The Group manages its credit risk on trade receivables and \ufb01nancial instruments by predominantly dealing with counterparties with an investment grade credit rating. Sufficient collateral is obtained to mitigate the risk of \ufb01nancial loss when transacting with counterparties with below investment grade credit ratings. Customers who wish to trade on unsecured credit terms are subject to credit veri\ufb01cation procedures. Receivable balances are monitored on an ongoing basis. As a result, the Group\u2019s exposure to bad debts is not signi\ufb01cant. The Group\u2019s maximum credit risk is limited to the carrying amount of its \ufb01nancial assets. Customer credit risk is managed by the Treasury function subject to the Group\u2019s established policy, procedures and controls relating to customer credit risk management. Credit quality of a customer is assessed based on an extensive credit rating scorecard and individual credit limits are de\ufb01ned in accordance with this assessment. Outstanding customer receivables are regularly monitored. At 31 December 2022, the Group had nineteen customers (2021: four customers) that owed the Group more than $10 million each and accounted for approximately 79% (2021: 88%) of all trade receivables. Depending on the product, settlement terms are 8 to 30 days from the date of invoice or bill of lading unless otherwise stated in the agreed payment terms. The Group considers the probability of default upon initial recognition of the asset and whether there has been a signi\ufb01cant depreciation in credit quality on an ongoing basis. A signi\ufb01cant decrease in credit quality is de\ufb01ned as a debtor being greater than 30 days past due in making a contractual payment. Credit losses for trade receivables (including lease receivables) and contract assets are determined by applying the simpli\ufb01ed approach and are measured at an amount equal to lifetime expected loss. Under the simpli\ufb01ed approach, determination of the loss allowance provision and expected loss rate incorporates past experience and forward- looking information, including the outlook for market demand and forward-looking interest rates. A default on other \ufb01nancial assets is considered to be when the counterparty fails to make contractual payments within 60 days of when they fall due. At 31 December 2022, the Group had a provision for credit losses of nil (2021: nil). Subsequent to 31 December 2022, 99% (2021: 100%) of the trade receivables balance of $1,067 million (2021: $152 million) has been received. Credit risk from balances with banks is managed by the Treasury function in accordance with the Group\u2019s policy. The Group\u2019s main funds are placed as short-term deposits with reputable \ufb01nancial institutions with strong investment grade credit ratings. At 31 December 2022 and 31 December 2021, there were no signi\ufb01cant concentrations of credit risk within the Group and \ufb01nancial instruments are spread amongst a number of \ufb01nancial institutions to minimise the risk of counterparty default. The maximum exposure to \ufb01nancial institution credit risk is represented by the sum of all cash deposits plus accrued interest, bank account balances and fair value of derivative assets. The Group\u2019s counterparty credit policy limits this exposure to commercial and investment banks, according to approved credit limits based on the counterparty\u2019s credit rating. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialRiskManagementExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-752": {
   "value": "Key estimates and judgements In applying the Group\u2019s accounting policies, management continually evaluates judgements, estimates and assumptions based on experience and other factors, including expectations of future events that may have an impact on the Group. All judgements, estimates and assumptions made are believed to be reasonable based on the most current set of circumstances known to management, and actual results may differ. Signi\ufb01cant judgements, estimates and assumptions made by management in the preparation of these \ufb01nancial statements are found in the following notes: Note A.1 Revenue from contracts with customers Page 110 Note A.5 Taxes Page 115 Note B.2 Exploration and evaluation Page 120 Note B.3 Oil and gas properties Page 121 Note B.4 Impairment of exploration and evaluation, oil and gas properties and goodwill Page 123 Note B.5 Business combination Page 128 Note B.6 Signi\ufb01cant production and growth asset acquisitions Page 130 Note B.7 Disposal of assets Page 131 Note D.5 Provisions Page 138 Note D.6 Other \ufb01nancial assets and liabilities Page 140 Note D.7 Leases Page 143 Note E.6 Joint arrangements Page 149 Key estimates and judgements Revenue from contracts with customers  The transaction price at the date control passes for sales made subject  to provisional pricing periods in oil and condensate contracts is  determined with reference to quoted commodity prices.  Judgement is also used to determine if it is highly probable that a  signi\ufb01cant reversal will not occur in relation to revenue recognised  during open pricing periods in LNG contracts. The Group estimates  variable consideration based on available information from contract  negotiations and market indicators. Key estimates and judgements (a) Income tax classi\ufb01cation  Judgement is required when determining whether a particular tax  is an income tax or another type of tax. PRRT is considered, for  accounting purposes, to be an income tax. Accounting for deferred  tax is applied to income taxes as described above, but is not applied  to other types of taxes, e.g. North West Shelf royalties, excise and  levies which are recognised in cost of sales in the income statement.  (b)  Deferred tax asset recognition  Income tax losses and credits: Deferred tax assets (DTAs) relating  to carry forward unused tax losses and credits arising from the USA  Tax Consolidation Group (USA TCG) of $1,371 million (2021: nil) and  $93 million (2021: nil) arising from regions other than Australia and  the USA have been recognised. The Group has determined that it  is probable that sufficient future taxable income will be available  to utilise those losses within those regions. Refer to Note E.9(a) for  details of tax consolidated groups. DTAs relating to carry forward unused tax losses and credits of  $250 million from the USA TCG, $146 million from USA entities  outside of the USA TCG and $1,061 million from regions other than  Australia and the USA have not been recognised as it is not currently  probable that the assets will be utilised based on current planned  activities in those regions (2021: $497 million unrecognised DTAs).  PRRT: The recoverability of PRRT deferred tax assets is primarily  assessed with regard to future oil price assumptions impacting  forecast future taxable pro\ufb01ts. As a result of higher actual and  forecast assessable revenues supporting future recoverability of  unrecognised quarantined exploration and general expenditure,  the Pluto PRRT DTA has increased by $1,362 million. In determining  the amount of DTA that is considered probable and eligible for  recognition, forecast future taxable pro\ufb01ts are risk-adjusted where  appropriate by a market premium risk rate to re\ufb02ect uncertainty  inherent in long-term forecasts. A long-term bond rate of 3.2%  (31 December 2021: 1.5%) was used for the purposes of augmentation.  Certain deferred tax assets on deductible temporary differences  have not been recognised on the basis that deductions from future  augmentation of the recognised deductible temporary difference will  be sufficient to offset future taxable pro\ufb01ts. $6,523 million (2021:  $4,507 million) relates to the North West Shelf Project, $189 million  (2021: $1,432 million) relates to remaining Pluto quarantined  exploration expenditure and $831 million (2021: $1,071 million) relates  to Wheatstone. A long-term bond rate of 3.2% (31 December 2021:  1.5%) was used for the purposes of augmentation. Had an alternative approach been used to assess recovery of  the deferred tax assets, whereby future augmentation was not  included in the assessment, additional deferred tax assets would  be recognised, with a corresponding bene\ufb01t to tax expense. It  was determined that the approach adopted provides the most  meaningful information on the implications of the PRRT regime,  whilst ensuring compliance with AASB 112/ IAS 12 Income Taxes. (c) Uncertain tax positions  The Group has tax matters, litigation and other claims, for which the  timing of resolution and potential economic out\ufb02ows are uncertain.  Where the Group assesses an outcome for any tax matter, litigation  or other claim as more likely than not to be accepted by the relevant  tax authority, the position is adopted in the reported tax balances.  Because of the complexity of some of these positions the ultimate  outcome may differ from the current estimate of the position. These  differences will be re\ufb02ected as increases or decreases to tax expense  in the period in which new information is available. Key estimates and judgements  (a) Area of interest  Typically, an area of interest (AOI) is de\ufb01ned by the Group as an  individual geographical area whereby the presence of hydrocarbons  is considered favourable or proved to exist. The Group has  established criteria to recognise and maintain an AOI.  (b) Transfer to projects in development Development activities commence after project sanctioning by  the appropriate level of management. Judgement is applied by  management in determining when the project is technically feasible  and economically viable to transfer to projects in development.  Key estimates and judgements  (a) Reserves The estimation of reserves requires signi\ufb01cant management  judgement and interpretation of complex geological and  geophysical models in order to make an assessment of the size,  shape, depth and quality of reservoirs, and their anticipated  recoveries.  Estimates of oil and natural gas reserves are used to calculate  depreciation and amortisation charges for the Group\u2019s oil and gas  properties. Judgement is used in determining the economic reserve  base applied to each asset. Typically, late life oil assets use proved  reserves.  Estimates are reviewed at least annually or when there are changes  in the economic circumstances impacting speci\ufb01c assets or asset  groups. These changes may impact depreciation, asset carrying  values, restoration provisions and deferred tax balances. If proved  plus probable (2P) reserves estimates are revised downwards,  earnings could be affected by higher depreciation expense or an  immediate write-down of the asset\u2019s carrying value.  (b) Depreciation and amortisation Judgement is required to determine when assets are available for  use to commence depreciation and amortisation. Depreciation and  amortisation generally commences on \ufb01rst production. Key estimates and judgements CGU determination Identi\ufb01cation of a CGU requires management judgement. In determining CGUs for acquired assets during the reporting period, management has assessed based on the smallest group of assets that generate signi\ufb01cant cash in\ufb02ows that are independent from other assets or groups of assets. Allocation of goodwill Allocation of goodwill to the relevant CGUs requires management judgement. The goodwill arising from the merger has been allocated to relevant CGUs which are expected to bene\ufb01t from the expected synergies as a result of the merger. Recoverable amount calculation key assumptions In determining the recoverable amount of CGUs, estimates are made regarding the present value of future cash \ufb02ows when determining the FVLCD. These estimates require signi\ufb01cant management judgement and are subject to risk and uncertainty, and hence changes in economic conditions can also affect the assumptions used and the rates used to discount future cash \ufb02ow estimates. The basis for each estimate used to determine recoverable amounts as at 31 December 2022 is set out below: \u2022  Resource estimates \u2013 2P and a portion of 2C reserves (where applicable) for oil and gas properties. The reserves are as disclosed in the Reserves and Resources Statement in the 31 December 2022 Annual Report. \u2022  In\ufb02ation rate \u2013 an in\ufb02ation rate of 2.0% has been applied for US based assets and 2.5% for Australian based assets. \u2022  Foreign exchange rates \u2013 a rate of $0.75 US$:AU$ is based on management\u2019s view of long-term exchange rates. Key estimates and judgements (cont.) Recoverable amount calculation key assumptions (cont.) \u2022  Discount rates \u2013 a range of post-tax discount rates between 8%  and 11.5% for CGUs has been applied. The discount rate re\ufb02ects an  assessment of the risks speci\ufb01c to the asset. \u2022  Carbon pricing \u2013 a long-term price of US$80/tonne of emissions  (real terms 2022) is based on management\u2019s assumptions on  carbon cost pricing and incorporates an evaluation of climate risk.  This is applicable to Australian emissions that exceed facility- speci\ufb01c baselines in accordance with Australian regulations, as well  as global emissions that exceed voluntary corporate net emissions  targets. Woodside continues to monitor the uncertainty around  climate change risks and will revise carbon pricing assumptions  accordingly. Refer to Climate change and energy transition section  within the basis of preparation for further information. \u2022  LNG price \u2013 the majority of LNG sales contracts are linked to an oil  price marker; accordingly the LNG prices used are consistent with  oil price assumptions. \u2022  Brent oil prices \u2013 derived from long-term views of global supply  and demand, building upon past experience of the industry and  consistent with external sources. Prices are adjusted for premiums  and discounts based on the nature and quality of the product. Brent  oil price estimates have considered the risk of climate policies along  with other factors such as industry investment and cost trends.  There is signi\ufb01cant uncertainty around how society will respond  to the climate challenge; Woodside\u2019s pricing assumptions re\ufb02ect  a \u2018best estimate\u2019 scenario in which global governments pursue  decarbonisation as well as other goals such as energy security  and economic development. As with carbon pricing, Woodside  continues to monitor this uncertainty and will revise its oil pricing  assumptions accordingly in its transition to a lower carbon  economy. Further information on climate change risk is provided  in the Climate change and energy transition section within the basis  of preparation. The nominal Brent oil prices (US$/bbl) used were: 2023 2024 2025 2026 2027 2028 31 December 20221 87 78 74 76 77 79 31 December 20212 71 68 69 70 72 73 1.   Long-term oil prices are based on US$70/bbl (2022 real terms) from  2025 and prices are escalated at 2.0% onwards.  2.  Long-term oil prices are based on US$65/bbl (2022 real terms) from  2024 and prices are escalated at 2.0% onwards. Key estimates and judgements CGU determination Identi\ufb01cation of a CGU requires management judgement. For the year ended 31 December 2021, management has determined that the Scarborough and Pluto Train 2 development concept integrates with the existing Pluto onshore assets and is the smallest group of assets that generate signi\ufb01cant cash in\ufb02ows that are independent from other assets or group of assets. Recoverable amount calculation key assumptions In determining the recoverable amount of CGUs, estimates are made regarding the present value of future cash \ufb02ows when determining the VIU. These estimates require signi\ufb01cant management judgement and are subject to risk and uncertainty, and hence changes in economic conditions can also affect the assumptions used and  the rates used to discount future cash \ufb02ow estimates. The basis for each estimate used to determine recoverable amounts as at 31 December 2021 is set out below: \u2022  Resource estimates \u2013 2P reserves for oil and gas properties, except for NWS Oil (Okha) which is based on 1P reserves due to the reclassi\ufb01cation to a late life asset. The reserves are as disclosed in the Reserves and resources statement in the 31 December 2021 Annual Report on pages 55-59. \u2022  In\ufb02ation rate \u2013 an in\ufb02ation rate of 2.0% has been applied. \u2022  Foreign exchange rates \u2013 a rate of $0.75 US$:AU$ is based on management\u2019s view of long-term exchange rates. \u2022  Discount rates \u2013 a range of pre-tax discount rates between 8.9% and 11.6% (post-tax discount rate 7.5%-8.5%) for CGUs has been applied. The discount rate re\ufb02ects an assessment of the risks speci\ufb01c to the asset. \u2022  An evaluation of climate risk is re\ufb02ected in Woodside's assumptions on carbon cost pricing, including a long-term Australian carbon price of US$80/tonne of emissions (real terms 2022). This is applicable to Australian emissions that exceed facility-speci\ufb01c baselines in accordance with Australian regulations, as well as global emissions that exceed voluntary corporate net emissions targets. Woodside continues to monitor the uncertainty around climate change risks and will revise carbon pricing assumptions accordingly. \u2022  LNG price \u2013 the majority of LNG sales contracts are linked to an oil price marker; accordingly the LNG prices used are consistent with oil price assumptions. \u2022  Brent oil prices \u2013 derived from long-term views of global supply and demand, building upon past experience of the industry and consistent with external sources. Prices are adjusted for premiums and discounts based on the nature and quality of the product. Brent oil price estimates have considered the risk of climate policies along with other factors such as industry investment and cost trends. There is signi\ufb01cant uncertainty around how society will respond to the climate challenge; Woodside\u2019s pricing assumptions re\ufb02ect a \u2018most-likely\u2019 scenario in which global governments pursue decarbonisation as well as other goals such as energy security and economic development. As with carbon pricing, Woodside continues to monitor this uncertainty and will revise its oil pricing assumptions accordingly in its transition to a lower carbon economy. Further information on climate change risk is provided  in Woodside\u2019s Climate Report 2021. The nominal Brent oil prices  (US$/bbl) used were: 2022 2023 2024 2025 2026 2027 31 December 20211 73 71 68 69 70 72 30 June 20202 57 62 67 72 73 75 1.  Based on US$65/bbl (2022 real terms) from 2024 with prices escalated at 2.0% annually thereafter. 2.  Based on US$65/bbl (2020 real terms) from 2025 with prices escalated at 2.0% annually thereafter. Key estimates and judgements (a) Fair value determination for net assets acquired Judgement is required to determine the fair value of assets acquired and liabilities assumed in a business combination, which can have a material impact on resultant goodwill. This includes the use of a cash \ufb02ow model to estimate the expected future cash \ufb02ows of the oil and gas assets acquired, based on reserves and resources at acquisition date and the discount rate used. The expected future cash \ufb02ows are based on estimates of future production, commodity and carbon prices, operating costs, and forecast capital expenditures at acquisition date. Restoration provisions require judgemental assumptions regarding removal date, environmental legislation and regulations and the extent of restoration activities required in determining the cost estimate. Carry forward tax losses are recognised only if it is probable that sufficient future taxable income will be available to utilise the losses. (b) Goodwill allocation Judgement is required in the allocation of goodwill to the Group\u2019s CGUs that are expected to bene\ufb01t from the synergies of the business combination. Refer to Note B.4 for the details of the goodwill allocation. Key estimates and judgements Nature of acquisition Judgement was required to determine if the transaction was the  acquisition of an asset or a business combination. The Sangomar  project was in the early phase of development and a substantive  process that had the ability to convert inputs to outputs was not  present and therefore the acquisition in 2021 was treated as asset  acquisitions.  Key estimates and judgements Sell-down of Train 2 Given the arrangements include provisions for GIP to sell its 49% interest back to Woodside if the status of key regulatory environmental approvals materially changes and the requirement for Woodside to fund up to $822 million of GIP\u2019s share in the event of a cost overrun, judgement is required to determine if the sell- down of Train 2 constitutes a sale and if a portion of the transaction price should be considered a variable consideration. Judgement was used to determine that the sell-down of  Train 2 constituted a sale given the various conditions included in the sale and purchase agreement. The Group determined that a sale occurred as control of the 49% interest was passed to GIP on completion date. Control is determined as the ability to direct the use of, and obtain substantially all of the economic bene\ufb01ts of, the associated interest. Judgement was used to determine if it is highly probable that a signi\ufb01cant reversal will not occur in relation to the consideration received. The Group estimated the variable consideration based on the construction capital expenditure cost pro\ufb01le, the development schedule, and assessing the probability and impact of any event which may result in a signi\ufb01cant reversal. The constraining estimates of variable consideration have been applied resulting  in the initial pre-tax gain on sale of $427 million. The variable consideration is remeasured at each reporting period with any changes recognised through the consolidated income statement. As at 31 December 2022, the variable consideration has been remeasured with a $71 million revaluation gain recognised as other income. Key estimates and judgements (a) Restoration obligations The Group estimates the future decommissioning and remediation costs of offshore oil and gas platforms, offshore and onshore production facilities, wells and pipelines at different stages of the development and construction of assets or facilities. In many instances, decommissioning of assets occurs many years into the future. The Group\u2019s restoration obligations are based on compliance with the requirements of relevant regulations which vary for different jurisdictions. For example Australian regulations require full removal for offshore assets unless regulator approval is received to decommission in-situ. The Group maintains technical expertise to ensure that industry learnings, scienti\ufb01c research and local and international guidelines are reviewed in assessing its restoration obligations. The restoration obligation requires judgemental assumptions regarding removal date, environmental legislation and regulations, the extent of restoration activities required, the engineering methodology for estimating cost, technologies used in determining the decommissioning cost, and liability-speci\ufb01c discount rates to determine the present value of these cash \ufb02ows. The Group applies either the \u2018expected outcome\u2019 approach or \u2018expected value\u2019 approach in assessing the cost estimate, re\ufb02ecting a difference in approach to cost estimation for heritage Woodside and heritage BHPP assets. Both approaches are supported by AASB 137/ IAS 37 Provisions, Contingent Liabilities and Contingent Assets, produce reliable estimates and are widely used in practice. Heritage Woodside assets refer to assets held by the Group prior to the BHPP merger. Heritage BHPP assets refers to assets acquired from BHP but excludes the commonly held assets by both heritage entities. Expected outcome approach This approach is used for heritage Woodside assets, and those assets commonly held by both heritage entities. The following cost assumptions are applied: \u2022  for onshore assets, provision has been made for the removal of production facilities and above ground pipelines using current restoration standards and techniques and taking into account risks and uncertainties; and \u2022  for offshore assets, provision has been made for the plug and abandonment of wells and the removal of offshore platform topsides, \ufb02oating production storage offloading (FPSO) and some subsea infrastructure. It is currently the Group\u2019s assumption that in some regulatory jurisdictions and environments, certain pipelines and infrastructure, parts of offshore platform substructures, and certain subsea infrastructure are decommissioned in-situ where it can be demonstrated that this will deliver equal or better environmental outcomes than full removal and that regulatory approval is obtained where arrangements are satisfactory to the regulator. Expected value approach This approach is used for heritage BHPP assets (excluding those commonly held by both heritage entities). For both onshore and offshore assets, provision has been made taking into consideration a risked range of possible removal outcomes, including full removal of certain assets. Individual site provisions are an estimate of the expected value of future cash \ufb02ows required to rehabilitate the relevant site using current restoration standards and techniques and taking into account risks and uncertainties. Individual site provisions are discounted to their present value using country speci\ufb01c discount rates aligned to the estimated timing of cash out\ufb02ows. Inherent uncertainties The basis of the restoration obligation provision for assets with approved decommissioning plans or general directions issued by the regulator can differ from the assumptions disclosed above. Whilst the provisions re\ufb02ect the Group\u2019s best estimate based on current knowledge and information, further studies and detailed analysis of the restoration activities for individual assets will be performed near the end of their operational life and/or when detailed decommissioning plans are required to be submitted to the relevant regulatory authorities. Actual costs and cash out\ufb02ows can materially differ from the current estimate as a result of changes in regulations and their application, prices, analysis of site conditions, further studies, timing of restoration and changes in removal technology. These uncertainties may result in actual expenditure differing from amounts included in the provision recognised as at 31 December 2022. A range of pre-tax discount rates between 3.4% and 4.7% (2021: 0.4% to 2.4%) has been applied. If the discount rates were decreased by 0.5% then the provision would be $316 million higher. If the cost estimates were increased by 10% then the provision would be $627 million higher. The proportion of the non-current balance not expected to be settled within 10 years is 54% (2021: 65%). (b) Legal case outcomes Provisions for legal cases are measured at the present value of the amount expected to settle the claim. Management is required to use judgement when assessing the likely outcome of legal cases, estimating the risked amount and whether a provision or contingent liability should be recognised. (c) Onerous contracts The onerous contract provision assessment requires management to make certain estimates regarding the unavoidable costs and the expected economic bene\ufb01ts from the contract. These estimates require signi\ufb01cant management judgement and are subject to risk and uncertainty, and hence changes in economic conditions can affect the assumptions. As at 31 December 2022, the Corpus Christi contract is expected to return a positive value and on this basis the provision has been reversed to nil (2021: $214 million). Changes in assumptions predominantly relating to the narrowing of the spread between the sales price and purchase price could result in the contract becoming onerous in the future. Assumptions used to determine the present value as at 31 December 2022 are set out below: \u2022  Remaining contract term \u2013 18 years. \u2022  Discount rate \u2013 a pre-tax, risk free US government bond rate  of 4.10% (2021: 1.855%) has been applied. \u2022  LNG pricing \u2013 forecast sales and purchase prices are subject to a number of price markers. Price assumptions are based on the best information on the market available at measurement date and derived from short- and long-term views of global supply and demand, building upon past experience of the industry and consistent with external sources. The forecasted sales are linked to gas hub prices (Title Transfer Facility (TTF)) at which physical sales are expected to occur and incorporate known sales pricing information . The long-term gas sales price is estimated on the basis of the Group\u2019s Brent price forecast. The estimated purchase price is linked to US gas hub prices (Henry Hub (HH)) at which physical purchases are expected to occur. The nominal TTF, Brent oil prices and HH gas prices used at 31 December 2022 were: 2023 2024 2025 2026 2027 TTF (US$/MMBtu) 47.9 36.4 22.3 8.8 9.0 Brent (US$/bbl) 87 78 74 76 77\u00b2 HH (US$/MMBtu) 6.1 4.7 4.0 4.1 4.23 1.  For committed volumes, contracted pricing has been applied. 2. Long-term oil prices are based on US$70/bbl (2022 real terms) from 2025 and prices are escalated at 2.0% onwards. 3. Long-term gas prices are based on US$3.8/MMBtu (2022 real terms) from 2025. All long-term prices are escalated at 2.0%. Key estimates and judgements Fair value of other \ufb01nancial assets and liabilities Estimates have been applied in the measurement of other \ufb01nancial  assets and liabilities and, where required, judgement is applied in  the settlement of any \ufb01nancial assets or liabilities. In the current  period, this included a $3 million periodic adjustment relating to  timing which increased other \ufb01nancial liabilities, re\ufb02ecting the  arrangements governing Wheatstone LNG sales (2021: $56 million  increase). Key estimates and judgements (a) Control Judgement is required to assess whether a contract is or contains a  lease at inception by assessing whether the Group has the right to  direct the use of the identi\ufb01ed asset and obtain substantially all the  economic bene\ufb01ts from the use of that asset. (b) Lease term Judgement is required when assessing the term of the lease and  whether to include optional extension and termination periods.  Option periods are only included in determining the lease term  at inception when they are reasonably certain to be exercised.  Lease terms are reassessed when a signi\ufb01cant change in  circumstances occurs. On this basis, possible additional lease  payments amounting to $2,323 million (2021: $1,654 million)  were not included in the measurement of lease liabilities. (c) lnterest in joint arrangements  Judgement is required to determine the Group\u2019s rights and  obligations for lease contracts within joint operations, to assess  whether lease liabilities are recognised gross (100%) or in proportion  to the Group\u2019s participating interest in the joint operation. This  includes an evaluation of whether the lease arrangement contains  a sublease with the joint operation. (d) Discount rates Judgement is required to determine the discount rate, where the  discount rate is the Group\u2019s incremental borrowing rate if the rate  implicit in the lease cannot be readily determined. The incremental  borrowing rate is determined with reference to the Group\u2019s  borrowing portfolio at the inception of the arrangement or  the time of the modi\ufb01cation. Key estimates and judgements  Accounting for interests in other entities  Judgement is required in assessing the level of control obtained in a  transaction to acquire an interest in another entity; depending upon  the facts and circumstances in each case, Woodside may obtain  control, joint control or signi\ufb01cant in\ufb02uence over the entity or  arrangement. Judgement is applied when determining the relevant  activities of a project and if joint control is held over it.  Relevant activities include, but are not limited to, work program  and budget approval, investment decision approval, voting rights in  joint operating committees, amendments to permits and changes  to joint arrangement participant holdings. Transactions which  give Woodside control of a business are business combinations.  If Woodside obtains joint control of an arrangement, judgement  is also required to assess whether the arrangement is a joint  operation or a joint venture. If Woodside has neither control nor  joint control, it may be in a position to exercise signi\ufb01cant in\ufb02uence  over the entity, which is then accounted for as an associate. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAccountingJudgementsAndEstimatesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-791": {
   "value": "Commodity price risk management The Group\u2019s revenue is exposed to commodity price \ufb02uctuations through the sale of hydrocarbons. Commodity price risks are measured by monitoring and stress testing the Group\u2019s forecast \ufb01nancial position to sustained periods of low oil and gas prices.  This analysis is regularly performed on the Group\u2019s portfolio and as required for discrete projects and transactions. The Group\u2019s management of commodity price risk includes the use of commodity derivatives to hedge its exposure (refer to Note D.6). The hedged exposure includes oil-linked revenue related to produced volumes and revenues derived from trading operations. Commodity derivatives protect the Group against downside price risk within its strategic and trading portfolio. As at the reporting date, the Group held hedging \ufb01nancial instruments with a net liability carrying value of $557 million (2021:  $431 million) exposed to commodity price risk. An increase in relevant commodity prices of 10% would increase the instruments\u2019 net liability by $219 million, the effect of which would be recognised within reserves and/or the income statement in accordance with hedge accounting application. A 10% decrease would have the same but opposite effect. This analysis assumes that all other variables remain constant (including the price on underlying physical exposures). ",
   "dimensions": {
    "concept": "woodsideenergygroupltd:DisclosureOfCommodityPriceRiskManagement",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00"
   }
  },
  "fact-792": {
   "value": "Foreign exchange risk management Foreign exchange risk arises from future commitments, \ufb01nancial assets and \ufb01nancial liabilities that are not denominated in US dollars.  The majority of the Group\u2019s revenue is denominated in US dollars. The Group is exposed to foreign currency risk arising from operating and capital expenditure incurred in currencies other than US dollars, particularly Australian dollars. The Group\u2019s management of foreign exchange risk relating to capital expenditure includes the use of forward exchange contract derivatives to hedge its exposure (refer to Note D.6). As at the reporting date, the Group held hedging \ufb01nancial instruments with a net liability carrying value of $17 million (2021: net asset carrying value of $10 million) exposed to foreign exchange risk. Measuring the exposure to foreign exchange risk is achieved by regularly monitoring and performing sensitivity analysis on the  Group\u2019s \ufb01nancial position. A reasonably possible change in the exchange rate of the US dollar to the Australian dollar (+12%/-12% (2021: +12%/-12%)), with all other variables held constant, would not have a material impact on the Group\u2019s equity or the income statement. Refer to Notes C1, C2, D2, D4 and D7 for details of the denominations of cash and cash equivalents, interest-bearing liabilities, receivables, payables and lease liabilities held at 31 December 2022. The Group entered into foreign exchange forward contracts to \ufb01x the Australian dollar to US dollar exchange rate in relation to a portion of the Australian dollar denominated capital expenditure incurred or expected to be incurred under the Scarborough development from 2022 to 2025 (refer to Note D.6). In order to hedge the foreign exchange risk and interest rate risk (refer to Section C) of a Swiss Franc (CHF) denominated medium term note, Woodside holds a number of cross-currency interest rate swaps (refer to Notes C.2 and D.6). The aim of these investments is to convert the \ufb01xed interest CHF bond into variable interest US dollar debt.",
   "dimensions": {
    "concept": "woodsideenergygroupltd:DisclosureOfForeignExchangeRiskManagement",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2021-01-01T00:00:00/2022-01-01T00:00:00"
   }
  },
  "fact-760": {
   "value": "A.1  Segment revenue and expenses Operating segment information The Group has identi\ufb01ed its operating segments based on the internal reports that are reviewed and used by the Chief Executive Officer (Chief Operating Decision Maker) in assessing performance and determining the allocation of resources. As a result of the merger with BHPP on 1 June 2022, the Group has transformed into a global energy company which has led to a change in how \ufb01nancial information is reported in the Group. The disclosed operating segments have been updated to re\ufb02ect this change and the 2021 and 2020 amounts have been restated to be presented on the same basis. Operating segments outlined below are identi\ufb01ed by management based on the nature and geographical location of the business and venture. Australia: Exploration, evaluation, development, production and sale of liqui\ufb01ed natural gas, pipeline gas, crude oil and condensate and natural gas liquids in Australia. International: Exploration, evaluation, development, production and sale of pipeline gas, crude oil and condensate and natural gas liquids in international jurisdictions outside of Australia. Marketing: Marketing, Shipping and Trading of Woodside\u2019s oil and gas portfolio (including non-produced volumes) and optimisation activities attributed to Marketing which have generated incremental value. Corporate/Other items: Corporate/Other items comprise primarily corporate non- segmental items of revenue and expenses and associated assets and liabilities not allocated to operating segments as they are not considered part of the core operations of any segment. In addition to the updated segments, the Group has reassessed the reporting of revenue from the sale of liqui\ufb01ed natural gas on a portfolio basis. With the Marketing segment separately reported for the year ended 31 December 2022, the Group will no longer report revenue from the sale of liqui\ufb01ed natural gas on a portfolio basis to better represent the revenues and margins generated by each segment. 2021 and 2020 amounts have been restated to be presented on the same basis. Major customer information The Group has two major customers which respectively account for 12% and 9% of the Group\u2019s external revenue. The sales are generated by the Australia and Marketing operating segments (2021: two major customers; 8% and 6% generated by the Australia operating segment and 2020: two major customers; 15% and 13% generated by the Australia operating segment). Geographical information Revenue from external customers1 Non-current assets2 2022 2021 2020 2022 2021 US$m US$m US$m US$m US$m Asia Paci\ufb01c  12,521   6,342   3,362   36,966   18,386 Americas  1,545   -   -   7,057   1 Africa  -   -   -   4,049   2,802 Europe  2,751   620   238   -   - Consolidated  16,817   6,962   3,600   48,072   21,189 1.  Revenue is attributable to geographic location based on the location of the customers. 2.  Non-current assets exclude deferred tax of $1,959 million (2021: $1,007 million). Recognition and measurement Revenue from contracts with customers Revenue is recognised when or as the Group transfers control of products or provides services to a customer at the amount to which the Group expects to be entitled. If the consideration includes a variable component, the Group estimates the amount of the expected consideration receivable. Variable consideration is estimated throughout the contract and is recognised to the extent that it is highly probable a signi\ufb01cant reversal will not occur. \u2022  Revenue from sale of hydrocarbons \u2013 Revenue from the sale of hydrocarbons is recognised at a point in time when control of the product is transferred to the customer. Revenue from take or pay contracts is recorded as unearned revenue until the product has been drawn by the customer (transfer of control), at which time it is recognised in earnings. \u2022  Other operating revenue \u2013 Revenue earned from LNG processing and other services is recognised over time as the services are rendered. Expenses \u2022  Royalties, excise and levies \u2013 Royalties, excise and levies are considered to be production-based taxes and are therefore accrued on the basis of the Group\u2019s entitlement to physical production. \u2022  Depreciation and amortisation \u2013 Refer to Note B.3. \u2022  Impairment and impairment reversals \u2013 Refer to Note B.4. \u2022  Leases \u2013 Refer to Note D.7. \u2022  Employee bene\ufb01ts \u2013 Refer to Note E.2. Key estimates and judgements Revenue from contracts with customers The transaction price at the date control passes for sales made subject to provisional pricing periods in oil and condensate contracts is determined with reference to quoted commodity prices. Judgement is also used to determine if it is highly probable that a signi\ufb01cant reversal will not occur in relation to revenue recognised during open pricing periods in LNG contracts. The Group estimates variable consideration based on available information from contract negotiations and market indicators. A.1  Segment revenue and expenses (cont.) Australia International Marketing Corporate/ Other Consolidated 2022 2022 2022 2022 2022 US$m US$m US$m US$m US$m Lique\ufb01ed natural gas 8,855  - 2,434  - 11,289 Pipeline gas 1,086  276  - - 1,362 Crude oil and condensate 2,467  1,273  18  - 3,758 Natural gas liquids 171  26  9  - 206 Revenue from sale of hydrocarbons 12,579  1,575  2,461  - 16,615 Intersegment revenue1 (455) (5) 460  - - Processing and services revenue 175  - - - 175 Shipping and other revenue - - 27  - 27 Other revenue (280) (5) 487  - 202 Operating revenue2 12,299  1,570  2,948  - 16,817 Production costs (975) (313) - 7  (1,281 Royalties, excise and levies (540) (39) - (17) (596) Insurance (35) (7) - (1) (43) Inventory movement 44  (3) - - 41 Costs of production (1,506) (362) - (11) (1,879) Land and buildings (51) (3) - - (54) Transferred exploration and evaluation  (107) - - - (107 Plant and equipment  (2,168) (436) - (33) (2,637) Oil and gas properties depreciation and amortisation (2,326) (439) - (33) (2,798 Shipping and direct sales costs (312) (36) (73) 142  (279 Trading costs (14) - (1,763) - (1,777 Other hydrocarbon costs (19) - - - (19) Other cost of sales (4) - - - (4) Movement in onerous contract provision3 - - 216  - 216 Other cost of sales (349) (36) (1,620) 142  (1,863) Cost of sales (4,181) (837) (1,620) 98  (6,540) Gross pro\ufb01t 8,118  733  1,328  98  10,277 Other income4 722  4  5  4  735 Exploration and evaluation expenditure5 (20) (277) - 1  (296) Amortisation of permit acquisition (1) (9) - - (10) Write-offs6 - (164) - - (164) Exploration and evaluation (21) (450) - 1  (470) General, administrative and other costs7 (13) (21) (10) (747) (791) Depreciation of other plant and equipment - - - - - Depreciation of lease assets (49) (11) - (80) (140) Restoration movement (234) (46) - 8  (272 Other8 (8) (84) (475) (486) (1,053) Other costs (304) (162) (485) (1,305) (2,256) Other expenses (325) (612) (485) (1,304) (2,726) Impairment losses - - - - - Impairment reversals 9 900  - - - 900 Pro\ufb01t/(loss) before tax and net \ufb01nance costs 9,415  125  848  (1,202) 9,186 1.  Intersegment revenue comprises the incremental income net of all associated expenses generated by the Marketing segment\u2019s optimisation of the oil and gas portfolio. The value is incremental income net of incremental costs. 2.  Operating revenue includes revenue from contracts with customers of $16,790 million and sub-lease income of $27 million disclosed within shipping and other revenue. 3.  Comprises changes in estimates of $245 million offset by provisions used of $29 million. Refer to Note D.5 for further details. 4.  Includes initial gain on Train 2 sell-down of $427 million, revaluation gain on the remeasurement of the Train 2 sell-down variable consideration of $71 million, fees and recoveries, foreign exchange gains and other income not associated with the ongoing operations of the business. 5.  Includes $142 million for various costs relating to the Group\u2019s exit from the Orphan Basin exploration licences in Canada. 6.  $125 million relates to costs of unsuccessful wells that have been written off. Refer to Note B.2. 7.  Transaction costs of $419 million incurred as a result of the BHPP merger on 1 June 2022 are included in the Corporate/Other segment. Refer to Note B.5 for details. 8.  Includes losses on hedging activities and changes in fair value of derivative \ufb01nancial instruments of $960 million in the Marketing and Corporate/Other segments and other expenses not associated with the ongoing operations of the business. 9.  Impairment reversals on oil and gas properties. Refer to Note B.4 for more details. A.1  Segment revenue and expenses (cont.) Australia International Marketing Corporate/ Other Consolidated 20218 20218 20218 20218 2021 US$m US$m US$m US$m US$m Lique\ufb01ed natural gas 3,910  - 1,449  - 5,359 Pipeline gas 43  - - - 43 Crude oil and condensate 1,316  - - - 1,316 Natural gas liquids 60  - - - 60 Revenue from sale of hydrocarbons 5,329  - 1,449  - 6,778 Intersegment revenue1 (236) - 236  - - Processing and services revenue 143  - - - 143 Shipping and other revenue 4  - 37  - 41 Other revenue (89) - 273  - 184 Operating revenue2 5,240  - 1,722  - 6,962 Production costs (489) - - 8  (481 Royalties, excise and levies (218) - - - (218 Insurance (32) - - 1  (31 Inventory movement 17  - - - 17 Costs of production (722) - - 9  (713 Land and buildings (51) - - - (51) Transferred exploration and evaluation  (79) - - - (79 Plant and equipment  (1,419) - - - (1,419 Oil and gas properties depreciation and amortisation (1,549) - - - (1,549 Shipping and direct sales costs (197) - (45) 32  (210) Trading costs (3) - (1,492) - (1,495 Other hydrocarbon costs (6) - - - (6) Other cost of sales (11) - - (1) (12 Movement in onerous contract provision3 - - 140  - 140 Other cost of sales (217) - (1,397) 31  (1,583) Cost of sales (2,488) - (1,397) 40  (3,845 Gross pro\ufb01t/(loss) 2,752  - 325  40  3,117 Other income4 97  (2) 1  43  139 Exploration and evaluation expenditure (16) (27) - (11) (54 Amortisation of permit acquisition - (2) - (1) (3 Write-offs5 - (265) - - (265 Exploration and evaluation (16) (294) - (12) (322 General, administrative and other costs (5) (1) - (152) (158) Depreciation of other plant and equipment - - - (30) (30 Depreciation of lease assets (28) - - (80) (108 Restoration movement (80) 12  - - (68 Other6 (57) (32) 28  (64) (125 Other costs (170) (21) 28  (326) (489 Other expenses (186) (315) 28  (338) (811) Impairment losses (10) - - - (10) Impairment reversals 7 1,058  - - - 1,058 Pro\ufb01t/(loss) before tax and net \ufb01nance costs 3,711  (317) 354  (255) 3,493 1.  Intersegment revenue comprises the incremental income net of all associated expenses generated by the Marketing segment\u2019s optimisation of the oil and gas portfolio. The value is incremental income net of incremental costs. 2.  Operating revenue includes revenue from contracts with customers of $6,923 million and sub-lease income of $39 million disclosed within shipping and other revenue. 3.  Comprises provisions used of $45 million and changes in estimates of $95 million. Refer to Note D.5 for further details. 4.  Includes other income of $67 million relating to Pluto volumes delivered into Wheatstone\u2019s sales commitments and net foreign exchange gains of $44 million. 5.  $56 million relates to costs of unsuccessful wells. $209 million relates to capitalised costs written off due to the Group\u2019s decision to withdraw from its interests in Myanmar. Refer to Note B.2. 6.  Includes net loss on hedging activities of $91 million, various costs relating to Woodside\u2019s exit from the Kitimat LNG development of $33 million and other expenses not associated with the ongoing operations of the business. 7.  Impairment reversals on oil and gas properties. Refer to Note B.4 for more details. 8.  The 2021 amounts have been restated to re\ufb02ect the changes in operating segments and portfolio reporting for LNG revenue. A.1  Segment revenue and expenses (cont.) Australia International Marketing Corporate/ Other Consolidated 20206 20206 20206 20206 2020 US$m US$m US$m US$m US$m Lique\ufb01ed natural gas1 2,390  - 129  - 2,519 Pipeline gas 73  - - - 73 Crude oil and condensate 843  - - - 843 Natural gas liquids 16  - - - 16 Revenue from sale of hydrocarbons 3,322  - 129  - 3,451 Intersegment revenue2 (47) - 47  - - Processing and services revenue 142  - - - 142 Shipping and other revenue 4  - 3  - 7 Other revenue 99  - 50  - 149 Operating revenue 3,421  - 179  - 3,600 Production costs (486) - - 8  (478) Royalties, excise and levies (82) - - - (82) Insurance (32) - - 1  (31) Inventory movement (32) - - - (32) Costs of production (632) - - 9  (623) Land and buildings (55) - - - (55) Transferred exploration and evaluation  (99) - - - (99) Plant and equipment  (1,535) - - - (1,535) Oil and gas properties depreciation and amortisation (1,689) - - - (1,689) Shipping and direct sales costs (146) - (3) 38  (111) Trading costs (4) - (207) - (211) Other hydrocarbon costs (4) - - - (4) Other cost of sales - - - - - Movement in onerous contract provision3 - - (347) - (347) Other cost of sales (154) - (557) 38  (673) Cost of sales (2,475) - (557) 47  (2,985) Gross pro\ufb01t/(loss) 946  - (378) 47  615 Other income4 3  (1) 1  (39) (36) Exploration and evaluation expenditure (26) (32) - (9) (67) Amortisation of permit acquisition (6) (5) - (1) (12) Write-offs - (2) - - (2) Exploration and evaluation (32) (39) - (10) (81) General, administrative and other costs (7) (14) - (169) (190) Depreciation of other plant and equipment - - - (29) (29) Depreciation of lease assets (26) - - (68) (94) Restoration movement (65) 37  - - (28) Other4 (8) - - (51) (59) Other costs (106) 23  - (317) (400) Other expenses (138) (16) - (327) (481) Impairment losses5 (3,971) (1,298) - - (5,269) Impairment reversals - - - - - Loss before tax and net \ufb01nance costs (3,160) (1,315) (377) (319) (5,171) 1.  Includes an adjustment of $113 million related to price reviews under negotiation for multiple contracts in the Australia segment, reducing revenue recognised in the current and prior periods and increasing other liabilities. 2.  Intersegment revenue comprises the incremental income net of all associated expenses generated by the Marketing segment\u2019s optimisation of the oil and gas portfolio. The value is incremental income net of incremental costs. 3.  Comprised of the recognition of an onerous contract provision $447 million, offset by changes in estimates of $54 million, provisions used of $41 million and a revision of discount rates of $5 million. 4.  Includes foreign exchange gains and losses, gains and losses on hedging activities, cancellation costs and other expenses not associated with the ongoing operations of the business. 5.  The impairment losses represent charges on exploration and evaluation of $1,557 million and oil and gas properties of $3,712 million. 6.  The 2020 amounts have been restated to re\ufb02ect the changes in operating segments and portfolio reporting for LNG revenue. Refer to Note A.1 for descriptions of the Group\u2019s segments and geographical regions. Australia International Marketing Corporate/ Other Consolidated 2022 2022 2022 2022 2022 US$m US$m US$m US$m US$m Balance as at 31 December Asia Paci\ufb01c 529  - - - 529 Americas - 240  - - 240 Africa - 38  - - 38 Total exploration and evaluation 529  278  - - 807 Balance as at 31 December Land and buildings 802  37  - 1  840 Transferred exploration and evaluation 481  - - - 481 Plant and equipment 18,249  4,647  - 161  23,057 Projects in development1 5,623  9,795  - 123  15,541 Total oil and gas properties 25,155  14,479  - 285  39,919 Balance as at 31 December Land and buildings 93  107  - 264  464 Plant and equipment 214  131  - 455  800 Total lease assets 307  238  - 719  1,264 Additions to exploration and evaluation2: Exploration 1  121  - - 122 Evaluation 19  100  - - 119 Restoration3 (1) - - - (1 19  221  - - 240 Additions to oil and gas properties 2: Oil and gas properties 2,252  1,560  - 92  3,904 Capitalised borrowings costs4 115  179  - - 294 Restoration3 (346) (28) - - (374) 2,021  1,711  - 92  3,824 Additions to lease assets 2 : Land and buildings 4  - - - 4 Plant and equipment 139  90  - 9  238 143  90  - 9  242 1.  Projects in development include the fair value ascribed to future phases of certain projects acquired through business combinations. 2.  Additions exclude acquisitions through business combinations. 3.  Relates to changes in restoration provision assumptions. 4.  Borrowing costs capitalised were at a weighted average interest rate of 3.8%. B.1  Segment production and growth assets B.1  Segment production and growth assets (cont.) Australia International Marketing Corporate/ Other Consolidated 20212 20212 20212 20212 2021 US$m US$m US$m US$m US$m Balance as at 31 December Asia Paci\ufb01c  546   -   -   -   546 Americas  -   -   -   -   - Africa  -   68   -   -   68 Total exploration and evaluation  546   68   -   -   614 Balance as at 31 December Land and buildings  738   -   -   1   739 Transferred exploration and evaluation  526   -   -   -   526 Plant and equipment  12,316   3   -   146   12,465 Projects in development  2,646   2,195   -   78   4,919 Total oil and gas properties  16,226   2,198   -   225   18,649 Balance as at 31 December Land and buildings  76   11   1   289   377 Plant and equipment  133   176   -   394   703 Total lease assets  209   187   1   683   1,080 Additions to exploration and evaluation: Exploration  1   41   -   -   42 Evaluation  451   2   -   -   453 Restoration  6   -   -   -   6 458   43   -   -   501 Additions to oil and gas properties: Oil and gas properties  1,071   1,051   -   57   2,179 Capitalised borrowings costs1  46   77   -   -   123 Restoration  18   14   -   -   32 1,135   1,142   -   57   2,334 Additions to lease assets: Land and buildings  -   14   -   -   14 Plant and equipment  -   214   -   -   214 -   228   -   -   228 1.  Borrowing costs capitalised were at a weighted average interest rate of 3.6%. 2.  The 2021 amounts have been restated to re\ufb02ect the changes in operating segments. Refer to \u2018Operating segment information\u2019 in Note A.1 for details. In addition, oil and gas properties includes other plant and equipment which is no longer separately presented in the consolidated statement of \ufb01nancial position. The 2021 amounts have been reclassi\ufb01ed to be presented on the same basis. D.1  Segment assets and liabilities 2022 20212 US$m US$m (a) Segment assets 1 Australia 31,240  18,163 International 18,084  2,877 Marketing 182  217 Corporate/Other  9,815  5,217 59,321  26,474 2022 20212 US$m US$m (b) Segment liabilities1 Australia 8,104  2,889 International 2,677  435 Marketing 561  639 Corporate/Other 10,852  8,282 22,194  12,245 1.  Acquisitions through business combination have been recognised on a provisional basis. Adjustments will be made to the provisional amounts if new information is obtained within 12 months from the acquisition date. Refer to Note B.5 for details. 2.  The 2021 amounts have been restated to re\ufb02ect the changes in operating segments. Refer to \u2018Operating segment information\u2019 in Note A.1 for details. Refer to Note A.1 for descriptions of the Group\u2019s segments. Corporate/other assets mainly comprise cash and cash equivalents, deferred tax assets and lease assets. Corporate/ other liabilities mainly comprise interest-bearing liabilities, deferred tax liabilities and lease liabilities. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEntitysReportableSegmentsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-793": {
   "value": "A.1  Segment revenue and expenses Operating segment information The Group has identi\ufb01ed its operating segments based on the internal reports that are reviewed and used by the Chief Executive Officer (Chief Operating Decision Maker) in assessing performance and determining the allocation of resources. As a result of the merger with BHPP on 1 June 2022, the Group has transformed into a global energy company which has led to a change in how \ufb01nancial information is reported in the Group. The disclosed operating segments have been updated to re\ufb02ect this change and the 2021 and 2020 amounts have been restated to be presented on the same basis. Operating segments outlined below are identi\ufb01ed by management based on the nature and geographical location of the business and venture. Australia: Exploration, evaluation, development, production and sale of liqui\ufb01ed natural gas, pipeline gas, crude oil and condensate and natural gas liquids in Australia. International: Exploration, evaluation, development, production and sale of pipeline gas, crude oil and condensate and natural gas liquids in international jurisdictions outside of Australia. Marketing: Marketing, Shipping and Trading of Woodside\u2019s oil and gas portfolio (including non-produced volumes) and optimisation activities attributed to Marketing which have generated incremental value. Corporate/Other items: Corporate/Other items comprise primarily corporate non- segmental items of revenue and expenses and associated assets and liabilities not allocated to operating segments as they are not considered part of the core operations of any segment. In addition to the updated segments, the Group has reassessed the reporting of revenue from the sale of liqui\ufb01ed natural gas on a portfolio basis. With the Marketing segment separately reported for the year ended 31 December 2022, the Group will no longer report revenue from the sale of liqui\ufb01ed natural gas on a portfolio basis to better represent the revenues and margins generated by each segment. 2021 and 2020 amounts have been restated to be presented on the same basis. Major customer information The Group has two major customers which respectively account for 12% and 9% of the Group\u2019s external revenue. The sales are generated by the Australia and Marketing operating segments (2021: two major customers; 8% and 6% generated by the Australia operating segment and 2020: two major customers; 15% and 13% generated by the Australia operating segment). Geographical information Revenue from external customers1 Non-current assets2 2022 2021 2020 2022 2021 US$m US$m US$m US$m US$m Asia Paci\ufb01c  12,521   6,342   3,362   36,966   18,386 Americas  1,545   -   -   7,057   1 Africa  -   -   -   4,049   2,802 Europe  2,751   620   238   -   - Consolidated  16,817   6,962   3,600   48,072   21,189 1.  Revenue is attributable to geographic location based on the location of the customers. 2.  Non-current assets exclude deferred tax of $1,959 million (2021: $1,007 million). Recognition and measurement Revenue from contracts with customers Revenue is recognised when or as the Group transfers control of products or provides services to a customer at the amount to which the Group expects to be entitled. If the consideration includes a variable component, the Group estimates the amount of the expected consideration receivable. Variable consideration is estimated throughout the contract and is recognised to the extent that it is highly probable a signi\ufb01cant reversal will not occur. \u2022  Revenue from sale of hydrocarbons \u2013 Revenue from the sale of hydrocarbons is recognised at a point in time when control of the product is transferred to the customer. Revenue from take or pay contracts is recorded as unearned revenue until the product has been drawn by the customer (transfer of control), at which time it is recognised in earnings. \u2022  Other operating revenue \u2013 Revenue earned from LNG processing and other services is recognised over time as the services are rendered. Expenses \u2022  Royalties, excise and levies \u2013 Royalties, excise and levies are considered to be production-based taxes and are therefore accrued on the basis of the Group\u2019s entitlement to physical production. \u2022  Depreciation and amortisation \u2013 Refer to Note B.3. \u2022  Impairment and impairment reversals \u2013 Refer to Note B.4. \u2022  Leases \u2013 Refer to Note D.7. \u2022  Employee bene\ufb01ts \u2013 Refer to Note E.2. Key estimates and judgements Revenue from contracts with customers The transaction price at the date control passes for sales made subject to provisional pricing periods in oil and condensate contracts is determined with reference to quoted commodity prices. Judgement is also used to determine if it is highly probable that a signi\ufb01cant reversal will not occur in relation to revenue recognised during open pricing periods in LNG contracts. The Group estimates variable consideration based on available information from contract negotiations and market indicators. A.1  Segment revenue and expenses (cont.) Australia International Marketing Corporate/ Other Consolidated 2022 2022 2022 2022 2022 US$m US$m US$m US$m US$m Lique\ufb01ed natural gas 8,855  - 2,434  - 11,289 Pipeline gas 1,086  276  - - 1,362 Crude oil and condensate 2,467  1,273  18  - 3,758 Natural gas liquids 171  26  9  - 206 Revenue from sale of hydrocarbons 12,579  1,575  2,461  - 16,615 Intersegment revenue1 (455) (5) 460  - - Processing and services revenue 175  - - - 175 Shipping and other revenue - - 27  - 27 Other revenue (280) (5) 487  - 202 Operating revenue2 12,299  1,570  2,948  - 16,817 Production costs (975) (313) - 7  (1,281 Royalties, excise and levies (540) (39) - (17) (596) Insurance (35) (7) - (1) (43) Inventory movement 44  (3) - - 41 Costs of production (1,506) (362) - (11) (1,879) Land and buildings (51) (3) - - (54) Transferred exploration and evaluation  (107) - - - (107 Plant and equipment  (2,168) (436) - (33) (2,637) Oil and gas properties depreciation and amortisation (2,326) (439) - (33) (2,798 Shipping and direct sales costs (312) (36) (73) 142  (279 Trading costs (14) - (1,763) - (1,777 Other hydrocarbon costs (19) - - - (19) Other cost of sales (4) - - - (4) Movement in onerous contract provision3 - - 216  - 216 Other cost of sales (349) (36) (1,620) 142  (1,863) Cost of sales (4,181) (837) (1,620) 98  (6,540) Gross pro\ufb01t 8,118  733  1,328  98  10,277 Other income4 722  4  5  4  735 Exploration and evaluation expenditure5 (20) (277) - 1  (296) Amortisation of permit acquisition (1) (9) - - (10) Write-offs6 - (164) - - (164) Exploration and evaluation (21) (450) - 1  (470) General, administrative and other costs7 (13) (21) (10) (747) (791) Depreciation of other plant and equipment - - - - - Depreciation of lease assets (49) (11) - (80) (140) Restoration movement (234) (46) - 8  (272 Other8 (8) (84) (475) (486) (1,053) Other costs (304) (162) (485) (1,305) (2,256) Other expenses (325) (612) (485) (1,304) (2,726) Impairment losses - - - - - Impairment reversals 9 900  - - - 900 Pro\ufb01t/(loss) before tax and net \ufb01nance costs 9,415  125  848  (1,202) 9,186 1.  Intersegment revenue comprises the incremental income net of all associated expenses generated by the Marketing segment\u2019s optimisation of the oil and gas portfolio. The value is incremental income net of incremental costs. 2.  Operating revenue includes revenue from contracts with customers of $16,790 million and sub-lease income of $27 million disclosed within shipping and other revenue. 3.  Comprises changes in estimates of $245 million offset by provisions used of $29 million. Refer to Note D.5 for further details. 4.  Includes initial gain on Train 2 sell-down of $427 million, revaluation gain on the remeasurement of the Train 2 sell-down variable consideration of $71 million, fees and recoveries, foreign exchange gains and other income not associated with the ongoing operations of the business. 5.  Includes $142 million for various costs relating to the Group\u2019s exit from the Orphan Basin exploration licences in Canada. 6.  $125 million relates to costs of unsuccessful wells that have been written off. Refer to Note B.2. 7.  Transaction costs of $419 million incurred as a result of the BHPP merger on 1 June 2022 are included in the Corporate/Other segment. Refer to Note B.5 for details. 8.  Includes losses on hedging activities and changes in fair value of derivative \ufb01nancial instruments of $960 million in the Marketing and Corporate/Other segments and other expenses not associated with the ongoing operations of the business. 9.  Impairment reversals on oil and gas properties. Refer to Note B.4 for more details. A.1  Segment revenue and expenses (cont.) Australia International Marketing Corporate/ Other Consolidated 20218 20218 20218 20218 2021 US$m US$m US$m US$m US$m Lique\ufb01ed natural gas 3,910  - 1,449  - 5,359 Pipeline gas 43  - - - 43 Crude oil and condensate 1,316  - - - 1,316 Natural gas liquids 60  - - - 60 Revenue from sale of hydrocarbons 5,329  - 1,449  - 6,778 Intersegment revenue1 (236) - 236  - - Processing and services revenue 143  - - - 143 Shipping and other revenue 4  - 37  - 41 Other revenue (89) - 273  - 184 Operating revenue2 5,240  - 1,722  - 6,962 Production costs (489) - - 8  (481 Royalties, excise and levies (218) - - - (218 Insurance (32) - - 1  (31 Inventory movement 17  - - - 17 Costs of production (722) - - 9  (713 Land and buildings (51) - - - (51) Transferred exploration and evaluation  (79) - - - (79 Plant and equipment  (1,419) - - - (1,419 Oil and gas properties depreciation and amortisation (1,549) - - - (1,549 Shipping and direct sales costs (197) - (45) 32  (210) Trading costs (3) - (1,492) - (1,495 Other hydrocarbon costs (6) - - - (6) Other cost of sales (11) - - (1) (12 Movement in onerous contract provision3 - - 140  - 140 Other cost of sales (217) - (1,397) 31  (1,583) Cost of sales (2,488) - (1,397) 40  (3,845 Gross pro\ufb01t/(loss) 2,752  - 325  40  3,117 Other income4 97  (2) 1  43  139 Exploration and evaluation expenditure (16) (27) - (11) (54 Amortisation of permit acquisition - (2) - (1) (3 Write-offs5 - (265) - - (265 Exploration and evaluation (16) (294) - (12) (322 General, administrative and other costs (5) (1) - (152) (158) Depreciation of other plant and equipment - - - (30) (30 Depreciation of lease assets (28) - - (80) (108 Restoration movement (80) 12  - - (68 Other6 (57) (32) 28  (64) (125 Other costs (170) (21) 28  (326) (489 Other expenses (186) (315) 28  (338) (811) Impairment losses (10) - - - (10) Impairment reversals 7 1,058  - - - 1,058 Pro\ufb01t/(loss) before tax and net \ufb01nance costs 3,711  (317) 354  (255) 3,493 1.  Intersegment revenue comprises the incremental income net of all associated expenses generated by the Marketing segment\u2019s optimisation of the oil and gas portfolio. The value is incremental income net of incremental costs. 2.  Operating revenue includes revenue from contracts with customers of $6,923 million and sub-lease income of $39 million disclosed within shipping and other revenue. 3.  Comprises provisions used of $45 million and changes in estimates of $95 million. Refer to Note D.5 for further details. 4.  Includes other income of $67 million relating to Pluto volumes delivered into Wheatstone\u2019s sales commitments and net foreign exchange gains of $44 million. 5.  $56 million relates to costs of unsuccessful wells. $209 million relates to capitalised costs written off due to the Group\u2019s decision to withdraw from its interests in Myanmar. Refer to Note B.2. 6.  Includes net loss on hedging activities of $91 million, various costs relating to Woodside\u2019s exit from the Kitimat LNG development of $33 million and other expenses not associated with the ongoing operations of the business. 7.  Impairment reversals on oil and gas properties. Refer to Note B.4 for more details. 8.  The 2021 amounts have been restated to re\ufb02ect the changes in operating segments and portfolio reporting for LNG revenue. A.1  Segment revenue and expenses (cont.) Australia International Marketing Corporate/ Other Consolidated 20206 20206 20206 20206 2020 US$m US$m US$m US$m US$m Lique\ufb01ed natural gas1 2,390  - 129  - 2,519 Pipeline gas 73  - - - 73 Crude oil and condensate 843  - - - 843 Natural gas liquids 16  - - - 16 Revenue from sale of hydrocarbons 3,322  - 129  - 3,451 Intersegment revenue2 (47) - 47  - - Processing and services revenue 142  - - - 142 Shipping and other revenue 4  - 3  - 7 Other revenue 99  - 50  - 149 Operating revenue 3,421  - 179  - 3,600 Production costs (486) - - 8  (478) Royalties, excise and levies (82) - - - (82) Insurance (32) - - 1  (31) Inventory movement (32) - - - (32) Costs of production (632) - - 9  (623) Land and buildings (55) - - - (55) Transferred exploration and evaluation  (99) - - - (99) Plant and equipment  (1,535) - - - (1,535) Oil and gas properties depreciation and amortisation (1,689) - - - (1,689) Shipping and direct sales costs (146) - (3) 38  (111) Trading costs (4) - (207) - (211) Other hydrocarbon costs (4) - - - (4) Other cost of sales - - - - - Movement in onerous contract provision3 - - (347) - (347) Other cost of sales (154) - (557) 38  (673) Cost of sales (2,475) - (557) 47  (2,985) Gross pro\ufb01t/(loss) 946  - (378) 47  615 Other income4 3  (1) 1  (39) (36) Exploration and evaluation expenditure (26) (32) - (9) (67) Amortisation of permit acquisition (6) (5) - (1) (12) Write-offs - (2) - - (2) Exploration and evaluation (32) (39) - (10) (81) General, administrative and other costs (7) (14) - (169) (190) Depreciation of other plant and equipment - - - (29) (29) Depreciation of lease assets (26) - - (68) (94) Restoration movement (65) 37  - - (28) Other4 (8) - - (51) (59) Other costs (106) 23  - (317) (400) Other expenses (138) (16) - (327) (481) Impairment losses5 (3,971) (1,298) - - (5,269) Impairment reversals - - - - - Loss before tax and net \ufb01nance costs (3,160) (1,315) (377) (319) (5,171) 1.  Includes an adjustment of $113 million related to price reviews under negotiation for multiple contracts in the Australia segment, reducing revenue recognised in the current and prior periods and increasing other liabilities. 2.  Intersegment revenue comprises the incremental income net of all associated expenses generated by the Marketing segment\u2019s optimisation of the oil and gas portfolio. The value is incremental income net of incremental costs. 3.  Comprised of the recognition of an onerous contract provision $447 million, offset by changes in estimates of $54 million, provisions used of $41 million and a revision of discount rates of $5 million. 4.  Includes foreign exchange gains and losses, gains and losses on hedging activities, cancellation costs and other expenses not associated with the ongoing operations of the business. 5.  The impairment losses represent charges on exploration and evaluation of $1,557 million and oil and gas properties of $3,712 million. 6.  The 2020 amounts have been restated to re\ufb02ect the changes in operating segments and portfolio reporting for LNG revenue. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRevenueExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-819": {
   "value": "A.1  Segment revenue and expenses Operating segment information The Group has identi\ufb01ed its operating segments based on the internal reports that are reviewed and used by the Chief Executive Officer (Chief Operating Decision Maker) in assessing performance and determining the allocation of resources. As a result of the merger with BHPP on 1 June 2022, the Group has transformed into a global energy company which has led to a change in how \ufb01nancial information is reported in the Group. The disclosed operating segments have been updated to re\ufb02ect this change and the 2021 and 2020 amounts have been restated to be presented on the same basis. Operating segments outlined below are identi\ufb01ed by management based on the nature and geographical location of the business and venture. Australia: Exploration, evaluation, development, production and sale of liqui\ufb01ed natural gas, pipeline gas, crude oil and condensate and natural gas liquids in Australia. International: Exploration, evaluation, development, production and sale of pipeline gas, crude oil and condensate and natural gas liquids in international jurisdictions outside of Australia. Marketing: Marketing, Shipping and Trading of Woodside\u2019s oil and gas portfolio (including non-produced volumes) and optimisation activities attributed to Marketing which have generated incremental value. Corporate/Other items: Corporate/Other items comprise primarily corporate non- segmental items of revenue and expenses and associated assets and liabilities not allocated to operating segments as they are not considered part of the core operations of any segment. In addition to the updated segments, the Group has reassessed the reporting of revenue from the sale of liqui\ufb01ed natural gas on a portfolio basis. With the Marketing segment separately reported for the year ended 31 December 2022, the Group will no longer report revenue from the sale of liqui\ufb01ed natural gas on a portfolio basis to better represent the revenues and margins generated by each segment. 2021 and 2020 amounts have been restated to be presented on the same basis. Major customer information The Group has two major customers which respectively account for 12% and 9% of the Group\u2019s external revenue. The sales are generated by the Australia and Marketing operating segments (2021: two major customers; 8% and 6% generated by the Australia operating segment and 2020: two major customers; 15% and 13% generated by the Australia operating segment). Geographical information Revenue from external customers1 Non-current assets2 2022 2021 2020 2022 2021 US$m US$m US$m US$m US$m Asia Paci\ufb01c  12,521   6,342   3,362   36,966   18,386 Americas  1,545   -   -   7,057   1 Africa  -   -   -   4,049   2,802 Europe  2,751   620   238   -   - Consolidated  16,817   6,962   3,600   48,072   21,189 1.  Revenue is attributable to geographic location based on the location of the customers. 2.  Non-current assets exclude deferred tax of $1,959 million (2021: $1,007 million). Recognition and measurement Revenue from contracts with customers Revenue is recognised when or as the Group transfers control of products or provides services to a customer at the amount to which the Group expects to be entitled. If the consideration includes a variable component, the Group estimates the amount of the expected consideration receivable. Variable consideration is estimated throughout the contract and is recognised to the extent that it is highly probable a signi\ufb01cant reversal will not occur. \u2022  Revenue from sale of hydrocarbons \u2013 Revenue from the sale of hydrocarbons is recognised at a point in time when control of the product is transferred to the customer. Revenue from take or pay contracts is recorded as unearned revenue until the product has been drawn by the customer (transfer of control), at which time it is recognised in earnings. \u2022  Other operating revenue \u2013 Revenue earned from LNG processing and other services is recognised over time as the services are rendered. Expenses \u2022  Royalties, excise and levies \u2013 Royalties, excise and levies are considered to be production-based taxes and are therefore accrued on the basis of the Group\u2019s entitlement to physical production. \u2022  Depreciation and amortisation \u2013 Refer to Note B.3. \u2022  Impairment and impairment reversals \u2013 Refer to Note B.4. \u2022  Leases \u2013 Refer to Note D.7. \u2022  Employee bene\ufb01ts \u2013 Refer to Note E.2. Key estimates and judgements Revenue from contracts with customers The transaction price at the date control passes for sales made subject to provisional pricing periods in oil and condensate contracts is determined with reference to quoted commodity prices. Judgement is also used to determine if it is highly probable that a signi\ufb01cant reversal will not occur in relation to revenue recognised during open pricing periods in LNG contracts. The Group estimates variable consideration based on available information from contract negotiations and market indicators. A.1  Segment revenue and expenses (cont.) Australia International Marketing Corporate/ Other Consolidated 2022 2022 2022 2022 2022 US$m US$m US$m US$m US$m Lique\ufb01ed natural gas 8,855  - 2,434  - 11,289 Pipeline gas 1,086  276  - - 1,362 Crude oil and condensate 2,467  1,273  18  - 3,758 Natural gas liquids 171  26  9  - 206 Revenue from sale of hydrocarbons 12,579  1,575  2,461  - 16,615 Intersegment revenue1 (455) (5) 460  - - Processing and services revenue 175  - - - 175 Shipping and other revenue - - 27  - 27 Other revenue (280) (5) 487  - 202 Operating revenue2 12,299  1,570  2,948  - 16,817 Production costs (975) (313) - 7  (1,281 Royalties, excise and levies (540) (39) - (17) (596) Insurance (35) (7) - (1) (43) Inventory movement 44  (3) - - 41 Costs of production (1,506) (362) - (11) (1,879) Land and buildings (51) (3) - - (54) Transferred exploration and evaluation  (107) - - - (107 Plant and equipment  (2,168) (436) - (33) (2,637) Oil and gas properties depreciation and amortisation (2,326) (439) - (33) (2,798 Shipping and direct sales costs (312) (36) (73) 142  (279 Trading costs (14) - (1,763) - (1,777 Other hydrocarbon costs (19) - - - (19) Other cost of sales (4) - - - (4) Movement in onerous contract provision3 - - 216  - 216 Other cost of sales (349) (36) (1,620) 142  (1,863) Cost of sales (4,181) (837) (1,620) 98  (6,540) Gross pro\ufb01t 8,118  733  1,328  98  10,277 Other income4 722  4  5  4  735 Exploration and evaluation expenditure5 (20) (277) - 1  (296) Amortisation of permit acquisition (1) (9) - - (10) Write-offs6 - (164) - - (164) Exploration and evaluation (21) (450) - 1  (470) General, administrative and other costs7 (13) (21) (10) (747) (791) Depreciation of other plant and equipment - - - - - Depreciation of lease assets (49) (11) - (80) (140) Restoration movement (234) (46) - 8  (272 Other8 (8) (84) (475) (486) (1,053) Other costs (304) (162) (485) (1,305) (2,256) Other expenses (325) (612) (485) (1,304) (2,726) Impairment losses - - - - - Impairment reversals 9 900  - - - 900 Pro\ufb01t/(loss) before tax and net \ufb01nance costs 9,415  125  848  (1,202) 9,186 1.  Intersegment revenue comprises the incremental income net of all associated expenses generated by the Marketing segment\u2019s optimisation of the oil and gas portfolio. The value is incremental income net of incremental costs. 2.  Operating revenue includes revenue from contracts with customers of $16,790 million and sub-lease income of $27 million disclosed within shipping and other revenue. 3.  Comprises changes in estimates of $245 million offset by provisions used of $29 million. Refer to Note D.5 for further details. 4.  Includes initial gain on Train 2 sell-down of $427 million, revaluation gain on the remeasurement of the Train 2 sell-down variable consideration of $71 million, fees and recoveries, foreign exchange gains and other income not associated with the ongoing operations of the business. 5.  Includes $142 million for various costs relating to the Group\u2019s exit from the Orphan Basin exploration licences in Canada. 6.  $125 million relates to costs of unsuccessful wells that have been written off. Refer to Note B.2. 7.  Transaction costs of $419 million incurred as a result of the BHPP merger on 1 June 2022 are included in the Corporate/Other segment. Refer to Note B.5 for details. 8.  Includes losses on hedging activities and changes in fair value of derivative \ufb01nancial instruments of $960 million in the Marketing and Corporate/Other segments and other expenses not associated with the ongoing operations of the business. 9.  Impairment reversals on oil and gas properties. Refer to Note B.4 for more details. A.1  Segment revenue and expenses (cont.) Australia International Marketing Corporate/ Other Consolidated 20218 20218 20218 20218 2021 US$m US$m US$m US$m US$m Lique\ufb01ed natural gas 3,910  - 1,449  - 5,359 Pipeline gas 43  - - - 43 Crude oil and condensate 1,316  - - - 1,316 Natural gas liquids 60  - - - 60 Revenue from sale of hydrocarbons 5,329  - 1,449  - 6,778 Intersegment revenue1 (236) - 236  - - Processing and services revenue 143  - - - 143 Shipping and other revenue 4  - 37  - 41 Other revenue (89) - 273  - 184 Operating revenue2 5,240  - 1,722  - 6,962 Production costs (489) - - 8  (481 Royalties, excise and levies (218) - - - (218 Insurance (32) - - 1  (31 Inventory movement 17  - - - 17 Costs of production (722) - - 9  (713 Land and buildings (51) - - - (51) Transferred exploration and evaluation  (79) - - - (79 Plant and equipment  (1,419) - - - (1,419 Oil and gas properties depreciation and amortisation (1,549) - - - (1,549 Shipping and direct sales costs (197) - (45) 32  (210) Trading costs (3) - (1,492) - (1,495 Other hydrocarbon costs (6) - - - (6) Other cost of sales (11) - - (1) (12 Movement in onerous contract provision3 - - 140  - 140 Other cost of sales (217) - (1,397) 31  (1,583) Cost of sales (2,488) - (1,397) 40  (3,845 Gross pro\ufb01t/(loss) 2,752  - 325  40  3,117 Other income4 97  (2) 1  43  139 Exploration and evaluation expenditure (16) (27) - (11) (54 Amortisation of permit acquisition - (2) - (1) (3 Write-offs5 - (265) - - (265 Exploration and evaluation (16) (294) - (12) (322 General, administrative and other costs (5) (1) - (152) (158) Depreciation of other plant and equipment - - - (30) (30 Depreciation of lease assets (28) - - (80) (108 Restoration movement (80) 12  - - (68 Other6 (57) (32) 28  (64) (125 Other costs (170) (21) 28  (326) (489 Other expenses (186) (315) 28  (338) (811) Impairment losses (10) - - - (10) Impairment reversals 7 1,058  - - - 1,058 Pro\ufb01t/(loss) before tax and net \ufb01nance costs 3,711  (317) 354  (255) 3,493 1.  Intersegment revenue comprises the incremental income net of all associated expenses generated by the Marketing segment\u2019s optimisation of the oil and gas portfolio. The value is incremental income net of incremental costs. 2.  Operating revenue includes revenue from contracts with customers of $6,923 million and sub-lease income of $39 million disclosed within shipping and other revenue. 3.  Comprises provisions used of $45 million and changes in estimates of $95 million. Refer to Note D.5 for further details. 4.  Includes other income of $67 million relating to Pluto volumes delivered into Wheatstone\u2019s sales commitments and net foreign exchange gains of $44 million. 5.  $56 million relates to costs of unsuccessful wells. $209 million relates to capitalised costs written off due to the Group\u2019s decision to withdraw from its interests in Myanmar. Refer to Note B.2. 6.  Includes net loss on hedging activities of $91 million, various costs relating to Woodside\u2019s exit from the Kitimat LNG development of $33 million and other expenses not associated with the ongoing operations of the business. 7.  Impairment reversals on oil and gas properties. Refer to Note B.4 for more details. 8.  The 2021 amounts have been restated to re\ufb02ect the changes in operating segments and portfolio reporting for LNG revenue. A.1  Segment revenue and expenses (cont.) Australia International Marketing Corporate/ Other Consolidated 20206 20206 20206 20206 2020 US$m US$m US$m US$m US$m Lique\ufb01ed natural gas1 2,390  - 129  - 2,519 Pipeline gas 73  - - - 73 Crude oil and condensate 843  - - - 843 Natural gas liquids 16  - - - 16 Revenue from sale of hydrocarbons 3,322  - 129  - 3,451 Intersegment revenue2 (47) - 47  - - Processing and services revenue 142  - - - 142 Shipping and other revenue 4  - 3  - 7 Other revenue 99  - 50  - 149 Operating revenue 3,421  - 179  - 3,600 Production costs (486) - - 8  (478) Royalties, excise and levies (82) - - - (82) Insurance (32) - - 1  (31) Inventory movement (32) - - - (32) Costs of production (632) - - 9  (623) Land and buildings (55) - - - (55) Transferred exploration and evaluation  (99) - - - (99) Plant and equipment  (1,535) - - - (1,535) Oil and gas properties depreciation and amortisation (1,689) - - - (1,689) Shipping and direct sales costs (146) - (3) 38  (111) Trading costs (4) - (207) - (211) Other hydrocarbon costs (4) - - - (4) Other cost of sales - - - - - Movement in onerous contract provision3 - - (347) - (347) Other cost of sales (154) - (557) 38  (673) Cost of sales (2,475) - (557) 47  (2,985) Gross pro\ufb01t/(loss) 946  - (378) 47  615 Other income4 3  (1) 1  (39) (36) Exploration and evaluation expenditure (26) (32) - (9) (67) Amortisation of permit acquisition (6) (5) - (1) (12) Write-offs - (2) - - (2) Exploration and evaluation (32) (39) - (10) (81) General, administrative and other costs (7) (14) - (169) (190) Depreciation of other plant and equipment - - - (29) (29) Depreciation of lease assets (26) - - (68) (94) Restoration movement (65) 37  - - (28) Other4 (8) - - (51) (59) Other costs (106) 23  - (317) (400) Other expenses (138) (16) - (327) (481) Impairment losses5 (3,971) (1,298) - - (5,269) Impairment reversals - - - - - Loss before tax and net \ufb01nance costs (3,160) (1,315) (377) (319) (5,171) 1.  Includes an adjustment of $113 million related to price reviews under negotiation for multiple contracts in the Australia segment, reducing revenue recognised in the current and prior periods and increasing other liabilities. 2.  Intersegment revenue comprises the incremental income net of all associated expenses generated by the Marketing segment\u2019s optimisation of the oil and gas portfolio. The value is incremental income net of incremental costs. 3.  Comprised of the recognition of an onerous contract provision $447 million, offset by changes in estimates of $54 million, provisions used of $41 million and a revision of discount rates of $5 million. 4.  Includes foreign exchange gains and losses, gains and losses on hedging activities, cancellation costs and other expenses not associated with the ongoing operations of the business. 5.  The impairment losses represent charges on exploration and evaluation of $1,557 million and oil and gas properties of $3,712 million. 6.  The 2020 amounts have been restated to re\ufb02ect the changes in operating segments and portfolio reporting for LNG revenue. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfExpensesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-829": {
   "value": "A.1  Segment revenue and expenses Operating segment information The Group has identi\ufb01ed its operating segments based on the internal reports that are reviewed and used by the Chief Executive Officer (Chief Operating Decision Maker) in assessing performance and determining the allocation of resources. As a result of the merger with BHPP on 1 June 2022, the Group has transformed into a global energy company which has led to a change in how \ufb01nancial information is reported in the Group. The disclosed operating segments have been updated to re\ufb02ect this change and the 2021 and 2020 amounts have been restated to be presented on the same basis. Operating segments outlined below are identi\ufb01ed by management based on the nature and geographical location of the business and venture. Australia: Exploration, evaluation, development, production and sale of liqui\ufb01ed natural gas, pipeline gas, crude oil and condensate and natural gas liquids in Australia. International: Exploration, evaluation, development, production and sale of pipeline gas, crude oil and condensate and natural gas liquids in international jurisdictions outside of Australia. Marketing: Marketing, Shipping and Trading of Woodside\u2019s oil and gas portfolio (including non-produced volumes) and optimisation activities attributed to Marketing which have generated incremental value. Corporate/Other items: Corporate/Other items comprise primarily corporate non- segmental items of revenue and expenses and associated assets and liabilities not allocated to operating segments as they are not considered part of the core operations of any segment. In addition to the updated segments, the Group has reassessed the reporting of revenue from the sale of liqui\ufb01ed natural gas on a portfolio basis. With the Marketing segment separately reported for the year ended 31 December 2022, the Group will no longer report revenue from the sale of liqui\ufb01ed natural gas on a portfolio basis to better represent the revenues and margins generated by each segment. 2021 and 2020 amounts have been restated to be presented on the same basis. Major customer information The Group has two major customers which respectively account for 12% and 9% of the Group\u2019s external revenue. The sales are generated by the Australia and Marketing operating segments (2021: two major customers; 8% and 6% generated by the Australia operating segment and 2020: two major customers; 15% and 13% generated by the Australia operating segment). Geographical information Revenue from external customers1 Non-current assets2 2022 2021 2020 2022 2021 US$m US$m US$m US$m US$m Asia Paci\ufb01c  12,521   6,342   3,362   36,966   18,386 Americas  1,545   -   -   7,057   1 Africa  -   -   -   4,049   2,802 Europe  2,751   620   238   -   - Consolidated  16,817   6,962   3,600   48,072   21,189 1.  Revenue is attributable to geographic location based on the location of the customers. 2.  Non-current assets exclude deferred tax of $1,959 million (2021: $1,007 million). Recognition and measurement Revenue from contracts with customers Revenue is recognised when or as the Group transfers control of products or provides services to a customer at the amount to which the Group expects to be entitled. If the consideration includes a variable component, the Group estimates the amount of the expected consideration receivable. Variable consideration is estimated throughout the contract and is recognised to the extent that it is highly probable a signi\ufb01cant reversal will not occur. \u2022  Revenue from sale of hydrocarbons \u2013 Revenue from the sale of hydrocarbons is recognised at a point in time when control of the product is transferred to the customer. Revenue from take or pay contracts is recorded as unearned revenue until the product has been drawn by the customer (transfer of control), at which time it is recognised in earnings. \u2022  Other operating revenue \u2013 Revenue earned from LNG processing and other services is recognised over time as the services are rendered. Expenses \u2022  Royalties, excise and levies \u2013 Royalties, excise and levies are considered to be production-based taxes and are therefore accrued on the basis of the Group\u2019s entitlement to physical production. \u2022  Depreciation and amortisation \u2013 Refer to Note B.3. \u2022  Impairment and impairment reversals \u2013 Refer to Note B.4. \u2022  Leases \u2013 Refer to Note D.7. \u2022  Employee bene\ufb01ts \u2013 Refer to Note E.2. Key estimates and judgements Revenue from contracts with customers The transaction price at the date control passes for sales made subject to provisional pricing periods in oil and condensate contracts is determined with reference to quoted commodity prices. Judgement is also used to determine if it is highly probable that a signi\ufb01cant reversal will not occur in relation to revenue recognised during open pricing periods in LNG contracts. The Group estimates variable consideration based on available information from contract negotiations and market indicators. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForSegmentReportingExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-832": {
   "value": "A.1  Segment revenue and expenses Operating segment information The Group has identi\ufb01ed its operating segments based on the internal reports that are reviewed and used by the Chief Executive Officer (Chief Operating Decision Maker) in assessing performance and determining the allocation of resources. As a result of the merger with BHPP on 1 June 2022, the Group has transformed into a global energy company which has led to a change in how \ufb01nancial information is reported in the Group. The disclosed operating segments have been updated to re\ufb02ect this change and the 2021 and 2020 amounts have been restated to be presented on the same basis. Operating segments outlined below are identi\ufb01ed by management based on the nature and geographical location of the business and venture. Australia: Exploration, evaluation, development, production and sale of liqui\ufb01ed natural gas, pipeline gas, crude oil and condensate and natural gas liquids in Australia. International: Exploration, evaluation, development, production and sale of pipeline gas, crude oil and condensate and natural gas liquids in international jurisdictions outside of Australia. Marketing: Marketing, Shipping and Trading of Woodside\u2019s oil and gas portfolio (including non-produced volumes) and optimisation activities attributed to Marketing which have generated incremental value. Corporate/Other items: Corporate/Other items comprise primarily corporate non- segmental items of revenue and expenses and associated assets and liabilities not allocated to operating segments as they are not considered part of the core operations of any segment. In addition to the updated segments, the Group has reassessed the reporting of revenue from the sale of liqui\ufb01ed natural gas on a portfolio basis. With the Marketing segment separately reported for the year ended 31 December 2022, the Group will no longer report revenue from the sale of liqui\ufb01ed natural gas on a portfolio basis to better represent the revenues and margins generated by each segment. 2021 and 2020 amounts have been restated to be presented on the same basis. Major customer information The Group has two major customers which respectively account for 12% and 9% of the Group\u2019s external revenue. The sales are generated by the Australia and Marketing operating segments (2021: two major customers; 8% and 6% generated by the Australia operating segment and 2020: two major customers; 15% and 13% generated by the Australia operating segment). Geographical information Revenue from external customers1 Non-current assets2 2022 2021 2020 2022 2021 US$m US$m US$m US$m US$m Asia Paci\ufb01c  12,521   6,342   3,362   36,966   18,386 Americas  1,545   -   -   7,057   1 Africa  -   -   -   4,049   2,802 Europe  2,751   620   238   -   - Consolidated  16,817   6,962   3,600   48,072   21,189 1.  Revenue is attributable to geographic location based on the location of the customers. 2.  Non-current assets exclude deferred tax of $1,959 million (2021: $1,007 million). Recognition and measurement Revenue from contracts with customers Revenue is recognised when or as the Group transfers control of products or provides services to a customer at the amount to which the Group expects to be entitled. If the consideration includes a variable component, the Group estimates the amount of the expected consideration receivable. Variable consideration is estimated throughout the contract and is recognised to the extent that it is highly probable a signi\ufb01cant reversal will not occur. \u2022  Revenue from sale of hydrocarbons \u2013 Revenue from the sale of hydrocarbons is recognised at a point in time when control of the product is transferred to the customer. Revenue from take or pay contracts is recorded as unearned revenue until the product has been drawn by the customer (transfer of control), at which time it is recognised in earnings. \u2022  Other operating revenue \u2013 Revenue earned from LNG processing and other services is recognised over time as the services are rendered. Expenses \u2022  Royalties, excise and levies \u2013 Royalties, excise and levies are considered to be production-based taxes and are therefore accrued on the basis of the Group\u2019s entitlement to physical production. \u2022  Depreciation and amortisation \u2013 Refer to Note B.3. \u2022  Impairment and impairment reversals \u2013 Refer to Note B.4. \u2022  Leases \u2013 Refer to Note D.7. \u2022  Employee bene\ufb01ts \u2013 Refer to Note E.2. Key estimates and judgements Revenue from contracts with customers The transaction price at the date control passes for sales made subject to provisional pricing periods in oil and condensate contracts is determined with reference to quoted commodity prices. Judgement is also used to determine if it is highly probable that a signi\ufb01cant reversal will not occur in relation to revenue recognised during open pricing periods in LNG contracts. The Group estimates variable consideration based on available information from contract negotiations and market indicators. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForRecognitionOfRevenue",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-834": {
   "value": "A.1  Segment revenue and expenses Operating segment information The Group has identi\ufb01ed its operating segments based on the internal reports that are reviewed and used by the Chief Executive Officer (Chief Operating Decision Maker) in assessing performance and determining the allocation of resources. As a result of the merger with BHPP on 1 June 2022, the Group has transformed into a global energy company which has led to a change in how \ufb01nancial information is reported in the Group. The disclosed operating segments have been updated to re\ufb02ect this change and the 2021 and 2020 amounts have been restated to be presented on the same basis. Operating segments outlined below are identi\ufb01ed by management based on the nature and geographical location of the business and venture. Australia: Exploration, evaluation, development, production and sale of liqui\ufb01ed natural gas, pipeline gas, crude oil and condensate and natural gas liquids in Australia. International: Exploration, evaluation, development, production and sale of pipeline gas, crude oil and condensate and natural gas liquids in international jurisdictions outside of Australia. Marketing: Marketing, Shipping and Trading of Woodside\u2019s oil and gas portfolio (including non-produced volumes) and optimisation activities attributed to Marketing which have generated incremental value. Corporate/Other items: Corporate/Other items comprise primarily corporate non- segmental items of revenue and expenses and associated assets and liabilities not allocated to operating segments as they are not considered part of the core operations of any segment. In addition to the updated segments, the Group has reassessed the reporting of revenue from the sale of liqui\ufb01ed natural gas on a portfolio basis. With the Marketing segment separately reported for the year ended 31 December 2022, the Group will no longer report revenue from the sale of liqui\ufb01ed natural gas on a portfolio basis to better represent the revenues and margins generated by each segment. 2021 and 2020 amounts have been restated to be presented on the same basis. Major customer information The Group has two major customers which respectively account for 12% and 9% of the Group\u2019s external revenue. The sales are generated by the Australia and Marketing operating segments (2021: two major customers; 8% and 6% generated by the Australia operating segment and 2020: two major customers; 15% and 13% generated by the Australia operating segment). Geographical information Revenue from external customers1 Non-current assets2 2022 2021 2020 2022 2021 US$m US$m US$m US$m US$m Asia Paci\ufb01c  12,521   6,342   3,362   36,966   18,386 Americas  1,545   -   -   7,057   1 Africa  -   -   -   4,049   2,802 Europe  2,751   620   238   -   - Consolidated  16,817   6,962   3,600   48,072   21,189 1.  Revenue is attributable to geographic location based on the location of the customers. 2.  Non-current assets exclude deferred tax of $1,959 million (2021: $1,007 million). Recognition and measurement Revenue from contracts with customers Revenue is recognised when or as the Group transfers control of products or provides services to a customer at the amount to which the Group expects to be entitled. If the consideration includes a variable component, the Group estimates the amount of the expected consideration receivable. Variable consideration is estimated throughout the contract and is recognised to the extent that it is highly probable a signi\ufb01cant reversal will not occur. \u2022  Revenue from sale of hydrocarbons \u2013 Revenue from the sale of hydrocarbons is recognised at a point in time when control of the product is transferred to the customer. Revenue from take or pay contracts is recorded as unearned revenue until the product has been drawn by the customer (transfer of control), at which time it is recognised in earnings. \u2022  Other operating revenue \u2013 Revenue earned from LNG processing and other services is recognised over time as the services are rendered. Expenses \u2022  Royalties, excise and levies \u2013 Royalties, excise and levies are considered to be production-based taxes and are therefore accrued on the basis of the Group\u2019s entitlement to physical production. \u2022  Depreciation and amortisation \u2013 Refer to Note B.3. \u2022  Impairment and impairment reversals \u2013 Refer to Note B.4. \u2022  Leases \u2013 Refer to Note D.7. \u2022  Employee bene\ufb01ts \u2013 Refer to Note E.2. Key estimates and judgements Revenue from contracts with customers The transaction price at the date control passes for sales made subject to provisional pricing periods in oil and condensate contracts is determined with reference to quoted commodity prices. Judgement is also used to determine if it is highly probable that a signi\ufb01cant reversal will not occur in relation to revenue recognised during open pricing periods in LNG contracts. The Group estimates variable consideration based on available information from contract negotiations and market indicators. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForExpensesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-761": {
   "value": "A.2  Finance costs 2022 2021 2020 US$m US$m US$m Interest on interest-bearing liabilities 212  201  237 Interest on lease liabilities 103  97  86 Accretion charge 110  29  32 Other \ufb01nance costs 36  26  29 Less: Finance costs capitalised against qualifying assets (294) (123) (57) 167  230  327 ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinanceCostExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-762": {
   "value": "A.3  Dividends paid and proposed Woodside Energy Group Ltd, the parent entity, paid and proposed dividends set out below: 2022 2021 2020 US$m US$m US$m (a) Dividends paid during the \ufb01nancial year Prior year fully franked \ufb01nal dividend1 1,018  115  518 Current year fully franked interim dividend2 2,070  289  248 3,088  404  766 (b) Dividend declared subsequent to the reporting period (not recorded as a liability) Final dividend3 2,734 1,018  115 (c) Other information Franking credits available for subsequent periods 1,406  1,744  1,823 Current year dividends per share (US cents) 253 135  38 1.  2022: US$1.05, paid on 23 March 2022  2021: US$0.12, paid on 24 March 2021 2020: US$0.55, paid on 20 March 2020 2.  2022: US$1.09, paid on 6 October 2022  2021: US$0.30, paid on 24 September 2021 2020: US$0.26, paid on 18 September 2020 3.  2022: US$1.44, to be paid on 5 April 2023 2021: US$1.05, paid on 23 March 2022 2020: US$0.12, paid on 24 March 2021 The Dividend Reinvestment Plan (DRP) was approved by the shareholders at the Annual General Meeting in 2003 for activation as required to fund future growth. The DRP was reactivated in 2019 and suspended by the Board of Directors  on 27 February 2023. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDividendsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-763": {
   "value": "A.4  Earnings/(losses) per share 2022 2021 2020 Pro\ufb01t/(loss) attributable to equity holders of the parent (US$m) 6,498  1,983  (4,028) Weighted average number of shares on issue for basic earnings/(loss) per share  1,511,257,404  962,604,811  951,113,086 Effect of dilution from contingently issuable shares 13,061,376  9,023,439  - Weighted average number of shares on issue adjusted for the effect of dilution1 1,524,318,780  971,628,250  951,113,086 Basic earnings/(losses) per share (US cents) 430.0   206.0  (423.5) Diluted earnings/(losses) per share (US cents) 426.3   204.1  (423.5) 1.  The contingently issuable shares in 2020 have an anti-dilutive impact. Earnings/(losses) per share is calculated by dividing the pro\ufb01t/ (loss) for the year attributable to ordinary equity holders of the parent by the weighted average number of ordinary shares on issue during the year. The weighted average number of shares makes allowance for shares reserved for employee share plans. Diluted earnings/(losses) per share is calculated by adjusting basic earnings/(losses) per share by the number of ordinary shares that would be issued on conversion of all the dilutive potential ordinary shares into ordinary shares. At 31 December 2022, 13,061,376 awards (2021: 9,023,439 awards) granted under the Woodside employee share plans are considered dilutive. Total outstanding share awards as at 31 December 2020 were 9,392,203 and considered anti-dilutive due to the loss position in 2020. There have been no signi\ufb01cant transactions involving ordinary shares between the reporting date and the date of completion  of these \ufb01nancial statements. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEarningsPerShareExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-794": {
   "value": "Earnings/(losses) per share is calculated by dividing the pro\ufb01t/ (loss) for the year attributable to ordinary equity holders of the parent by the weighted average number of ordinary shares on issue during the year. The weighted average number of shares makes allowance for shares reserved for employee share plans. Diluted earnings/(losses) per share is calculated by adjusting basic earnings/(losses) per share by the number of ordinary shares that would be issued on conversion of all the dilutive potential ordinary shares into ordinary shares. At 31 December 2022, 13,061,376 awards (2021: 9,023,439 awards) granted under the Woodside employee share plans are considered dilutive. Total outstanding share awards as at 31 December 2020 were 9,392,203 and considered anti-dilutive due to the loss position in 2020. There have been no signi\ufb01cant transactions involving ordinary shares between the reporting date and the date of completion  of these \ufb01nancial statements. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForEarningsPerShareExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-764": {
   "value": "2022 2021 2020 US$m US$m US$m (a) Tax expense comprises Petroleum resource rent tax (PRRT) Current tax expense 501  - - Deferred tax (bene\ufb01t)/expense (814) 297  (439) PRRT (bene\ufb01t)/expense (313) 297  (439) Income tax Current year Current tax expense 2,256  658  275 Deferred tax expense/(bene\ufb01t) 701  301  (1,308) Adjustment to prior years Current tax (bene\ufb01t)/expense (276) (20) 16 Deferred tax expense/(bene\ufb01t) 231  18  (9) Income tax expense/(bene\ufb01t) 2,912  957  (1,026) Tax expense/(bene\ufb01t) 2,599  1,254  (1,465) (b) Reconciliation of income tax expense Pro\ufb01t/(loss) before tax 9,174  3,290  (5,440) PRRT bene\ufb01t/(expense) 313  (297) 439 Pro\ufb01t/(loss) before income tax 9,487  2,993  (5,001) Income tax expense/(bene\ufb01t) calculated at 30% 2,847  898  (1,500) Effect of tax rate differentials (141) (42) 192 Effect of deferred tax assets not recognised 150  114  270 Foreign exchange impact on tax (bene\ufb01t)/ expense (44) (18) 3 Adjustment to prior years (45) (2) 7 Integration and transaction costs non- deductible 142  - - Other 3  7  2 Income tax expense/(bene\ufb01t) 2,912  957  (1,026) (c) Reconciliation of PRRT bene\ufb01t Pro\ufb01t/(loss) before tax 9,174  3,290  (5,440) Non-PRRT assessable (pro\ufb01t)/loss (6,197) (2,134) 3,080 PRRT projects pro\ufb01t/(loss) before tax 2,977  1,156  (2,360) PRRT expense/(bene\ufb01t) calculated at 40% 1,191  462  (944) (Recognition)/derecognition of Pluto general expenditure1 (1,362) - 627 Augmentation (175) (166) (138) Other 33  1  16 PRRT (bene\ufb01t)/expense (313) 297  (439) (d) Deferred tax income statement reconciliation PRRT Production and growth assets (710) 455  (242) Augmentation for current year (175) (166) (138) Provisions (12) (29) (32) Other 83  37  (27) PRRT (bene\ufb01t)/expense (814) 297  (439) Income tax Oil and gas properties 292  674  (981) Exploration and evaluation assets 14  (204) (210) Lease assets and liabilities 25  1  (16) Provisions 151  (10) (106) PRRT assets and liabilities 236  (88) 134 Unused tax losses and tax credits 19  149  (149) Assets held for sale 205  (205) - Derivatives 21  (11) 16 Other (31) 13  (5) Income tax deferred tax expense/(bene\ufb01t) 932  319  (1,317) Deferred tax expense/(bene\ufb01t) 118  616  (1,756) (e) Deferred tax other comprehensive income reconciliation Income tax Derivatives (64) 5  (25) Other (2) 5  6 Deferred income tax (bene\ufb01t)/expense via other comprehensive income (66) 10  (19) A.5 Taxes 2022 2021 2020 % % % (f) Effective income tax rate: Australian and global operations Effective income tax rate2 Australia 30.0% 30.6% 29.6% Global 30.7% 32.0% 20.5% 1.  The $1,362 million increase of the Pluto PRRT deferred tax asset is due to the recognition of previously unrecognised deductible expenditure that is now expected to be utilised to offset future taxable pro\ufb01ts. 2.  The global operations effective income tax rate (ETR) is calculated as the Group\u2019s income tax expense divided by pro\ufb01t before income tax. The Australian operations ETR is calculated with reference to all Australian companies and excludes foreign exchange on settlement and revaluation of income tax liabilities. 2022 2021 US$m US$m (g) Deferred tax balance sheet reconciliation Deferred tax assets PRRT Production and growth assets 1,460  767 Augmentation for current year 113  166 Provisions 271  75 Other (23) (1) PRRT deferred tax assets 1,821  1,007 Income tax3 Oil and gas properties (1,496) - Exploration and evaluation assets 30  - Lease assets and liabilities 23  - Unused tax losses and tax credits 1,464  - Derivatives 23  - Provisions 60  - Other 34  - Income tax deferred tax assets 138  - Deferred tax assets 1,959  1,007 Deferred tax liabilities PRRT4 Production and growth assets 1,281  - Augmentation for current year (62) - Provisions (743) - Other 137  - PRRT deferred tax liabilities 613  - Income tax Oil and gas properties 2,857  1,520 Exploration and evaluation assets 67  51 Lease assets and liabilities (22) (38) Provisions (1,280) (706) PRRT assets and liabilities 347  303 Assets held for sale - (205) Derivatives (36) (15) Other (89) (32) Income tax deferred tax liabilities 1,844  878 Deferred tax liabilities 2,457  878 3.  The Group was in a net income tax deferred tax liability position in 2021. 4.  The Group was in a net PRRT deferred tax asset position in 2021. Key estimates and judgements (a) Income tax classi\ufb01cation Judgement is required when determining whether a particular tax is an income tax or another type of tax. PRRT is considered, for accounting purposes, to be an income tax. Accounting for deferred tax is applied to income taxes as described above, but is not applied to other types of taxes, e.g. North West Shelf royalties, excise and levies which are recognised in cost of sales in the income statement. (b)  Deferred tax asset recognition Income tax losses and credits: Deferred tax assets (DTAs) relating to carry forward unused tax losses and credits arising from the USA Tax Consolidation Group (USA TCG) of $1,371 million (2021: nil) and $93 million (2021: nil) arising from regions other than Australia and the USA have been recognised. The Group has determined that it is probable that sufficient future taxable income will be available to utilise those losses within those regions. Refer to Note E.9(a) for details of tax consolidated groups. DTAs relating to carry forward unused tax losses and credits of  $250 million from the USA TCG, $146 million from USA entities outside of the USA TCG and $1,061 million from regions other than Australia and the USA have not been recognised as it is not currently probable that the assets will be utilised based on current planned activities in those regions (2021: $497 million unrecognised DTAs). PRRT: The recoverability of PRRT deferred tax assets is primarily assessed with regard to future oil price assumptions impacting forecast future taxable pro\ufb01ts. As a result of higher actual and forecast assessable revenues supporting future recoverability of unrecognised quarantined exploration and general expenditure, the Pluto PRRT DTA has increased by $1,362 million. In determining the amount of DTA that is considered probable and eligible for recognition, forecast future taxable pro\ufb01ts are risk-adjusted where appropriate by a market premium risk rate to re\ufb02ect uncertainty inherent in long-term forecasts. A long-term bond rate of 3.2%  (31 December 2021: 1.5%) was used for the purposes of augmentation. Certain deferred tax assets on deductible temporary differences have not been recognised on the basis that deductions from future augmentation of the recognised deductible temporary difference will be sufficient to offset future taxable pro\ufb01ts. $6,523 million (2021:  $4,507 million) relates to the North West Shelf Project, $189 million (2021: $1,432 million) relates to remaining Pluto quarantined exploration expenditure and $831 million (2021: $1,071 million) relates to Wheatstone. A long-term bond rate of 3.2% (31 December 2021: 1.5%) was used for the purposes of augmentation. Had an alternative approach been used to assess recovery of the deferred tax assets, whereby future augmentation was not included in the assessment, additional deferred tax assets would be recognised, with a corresponding bene\ufb01t to tax expense. It was determined that the approach adopted provides the most meaningful information on the implications of the PRRT regime, whilst ensuring compliance with AASB 112/ IAS 12 Income Taxes. (c) Uncertain tax positions The Group has tax matters, litigation and other claims, for which the timing of resolution and potential economic out\ufb02ows are uncertain. Where the Group assesses an outcome for any tax matter, litigation or other claim as more likely than not to be accepted by the relevant tax authority, the position is adopted in the reported tax balances. Because of the complexity of some of these positions the ultimate outcome may differ from the current estimate of the position. These differences will be re\ufb02ected as increases or decreases to tax expense in the period in which new information is available. A.5  Taxes (cont.) Tax transparency code Woodside participates in the Australian Board of Taxation\u2019s voluntary Tax Transparency Code (TTC). To increase public con\ufb01dence in the contributions and compliance of corporate taxpayers, the TTC recommends public disclosure of tax information. Part A of the recommended disclosures are addressed within this Taxes note and Part B within our Sustainable Development Report, supported by additional information on our website. Recognition and measurement Current tax assets and liabilities are measured at the amount expected to be recovered from or paid to the taxation authorities. Deferred tax assets and liabilities are measured at the tax rates that are expected to apply in the period in which the liability is settled or the asset is realised. The tax rates and laws used to determine the amount are based on those that have been enacted or substantially enacted by the end of the reporting period. Income taxes relating to items recognised directly in equity are recognised in equity. Current taxes Current tax expense is the expected tax payable on the taxable income for the current year and any adjustment to tax paid in respect of previous years. Deferred taxes Deferred tax expense represents movements in the temporary differences between the carrying amount of an asset or liability in the consolidated statement of \ufb01nancial position and its tax base. With the exception of those noted below, deferred tax liabilities are recognised for all taxable temporary differences. Deferred tax assets are recognised for deductible temporary differences, unused tax losses and tax credits only if it is probable that sufficient future taxable income will be available to utilise those temporary differences and losses. Deferred tax is not recognised if the temporary difference arises from goodwill or from the initial recognition (other than in a business combination) of assets and liabilities in a transaction that affects neither accounting pro\ufb01t nor the taxable pro\ufb01t. In relation to PRRT, the impact of future augmentation on expenditure is included in the determination of future taxable pro\ufb01ts when assessing the extent to which a deferred tax asset can be recognised in the consolidated statement of \ufb01nancial position. Offsetting deferred tax balances Deferred tax assets and liabilities are offset only if there is a legally enforceable right to offset current tax assets and liabilities and when they relate to income taxes levied by the same taxation authority on either the same taxable entity or different taxable entities that the Group intends to settle its current tax assets and liabilities on a net basis. Refer to Notes E.8 and E.9 for detail on the tax consolidated groups. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-795": {
   "value": "2022 2021 2020 US$m US$m US$m (a) Tax expense comprises Petroleum resource rent tax (PRRT) Current tax expense 501  - - Deferred tax (bene\ufb01t)/expense (814) 297  (439) PRRT (bene\ufb01t)/expense (313) 297  (439) Income tax Current year Current tax expense 2,256  658  275 Deferred tax expense/(bene\ufb01t) 701  301  (1,308) Adjustment to prior years Current tax (bene\ufb01t)/expense (276) (20) 16 Deferred tax expense/(bene\ufb01t) 231  18  (9) Income tax expense/(bene\ufb01t) 2,912  957  (1,026) Tax expense/(bene\ufb01t) 2,599  1,254  (1,465) (b) Reconciliation of income tax expense Pro\ufb01t/(loss) before tax 9,174  3,290  (5,440) PRRT bene\ufb01t/(expense) 313  (297) 439 Pro\ufb01t/(loss) before income tax 9,487  2,993  (5,001) Income tax expense/(bene\ufb01t) calculated at 30% 2,847  898  (1,500) Effect of tax rate differentials (141) (42) 192 Effect of deferred tax assets not recognised 150  114  270 Foreign exchange impact on tax (bene\ufb01t)/ expense (44) (18) 3 Adjustment to prior years (45) (2) 7 Integration and transaction costs non- deductible 142  - - Other 3  7  2 Income tax expense/(bene\ufb01t) 2,912  957  (1,026) (c) Reconciliation of PRRT bene\ufb01t Pro\ufb01t/(loss) before tax 9,174  3,290  (5,440) Non-PRRT assessable (pro\ufb01t)/loss (6,197) (2,134) 3,080 PRRT projects pro\ufb01t/(loss) before tax 2,977  1,156  (2,360) PRRT expense/(bene\ufb01t) calculated at 40% 1,191  462  (944) (Recognition)/derecognition of Pluto general expenditure1 (1,362) - 627 Augmentation (175) (166) (138) Other 33  1  16 PRRT (bene\ufb01t)/expense (313) 297  (439) (d) Deferred tax income statement reconciliation PRRT Production and growth assets (710) 455  (242) Augmentation for current year (175) (166) (138) Provisions (12) (29) (32) Other 83  37  (27) PRRT (bene\ufb01t)/expense (814) 297  (439) Income tax Oil and gas properties 292  674  (981) Exploration and evaluation assets 14  (204) (210) Lease assets and liabilities 25  1  (16) Provisions 151  (10) (106) PRRT assets and liabilities 236  (88) 134 Unused tax losses and tax credits 19  149  (149) Assets held for sale 205  (205) - Derivatives 21  (11) 16 Other (31) 13  (5) Income tax deferred tax expense/(bene\ufb01t) 932  319  (1,317) Deferred tax expense/(bene\ufb01t) 118  616  (1,756) (e) Deferred tax other comprehensive income reconciliation Income tax Derivatives (64) 5  (25) Other (2) 5  6 Deferred income tax (bene\ufb01t)/expense via other comprehensive income (66) 10  (19) A.5 Taxes 2022 2021 2020 % % % (f) Effective income tax rate: Australian and global operations Effective income tax rate2 Australia 30.0% 30.6% 29.6% Global 30.7% 32.0% 20.5% 1.  The $1,362 million increase of the Pluto PRRT deferred tax asset is due to the recognition of previously unrecognised deductible expenditure that is now expected to be utilised to offset future taxable pro\ufb01ts. 2.  The global operations effective income tax rate (ETR) is calculated as the Group\u2019s income tax expense divided by pro\ufb01t before income tax. The Australian operations ETR is calculated with reference to all Australian companies and excludes foreign exchange on settlement and revaluation of income tax liabilities. 2022 2021 US$m US$m (g) Deferred tax balance sheet reconciliation Deferred tax assets PRRT Production and growth assets 1,460  767 Augmentation for current year 113  166 Provisions 271  75 Other (23) (1) PRRT deferred tax assets 1,821  1,007 Income tax3 Oil and gas properties (1,496) - Exploration and evaluation assets 30  - Lease assets and liabilities 23  - Unused tax losses and tax credits 1,464  - Derivatives 23  - Provisions 60  - Other 34  - Income tax deferred tax assets 138  - Deferred tax assets 1,959  1,007 Deferred tax liabilities PRRT4 Production and growth assets 1,281  - Augmentation for current year (62) - Provisions (743) - Other 137  - PRRT deferred tax liabilities 613  - Income tax Oil and gas properties 2,857  1,520 Exploration and evaluation assets 67  51 Lease assets and liabilities (22) (38) Provisions (1,280) (706) PRRT assets and liabilities 347  303 Assets held for sale - (205) Derivatives (36) (15) Other (89) (32) Income tax deferred tax liabilities 1,844  878 Deferred tax liabilities 2,457  878 3.  The Group was in a net income tax deferred tax liability position in 2021. 4.  The Group was in a net PRRT deferred tax asset position in 2021. Key estimates and judgements (a) Income tax classi\ufb01cation Judgement is required when determining whether a particular tax is an income tax or another type of tax. PRRT is considered, for accounting purposes, to be an income tax. Accounting for deferred tax is applied to income taxes as described above, but is not applied to other types of taxes, e.g. North West Shelf royalties, excise and levies which are recognised in cost of sales in the income statement. (b)  Deferred tax asset recognition Income tax losses and credits: Deferred tax assets (DTAs) relating to carry forward unused tax losses and credits arising from the USA Tax Consolidation Group (USA TCG) of $1,371 million (2021: nil) and $93 million (2021: nil) arising from regions other than Australia and the USA have been recognised. The Group has determined that it is probable that sufficient future taxable income will be available to utilise those losses within those regions. Refer to Note E.9(a) for details of tax consolidated groups. DTAs relating to carry forward unused tax losses and credits of  $250 million from the USA TCG, $146 million from USA entities outside of the USA TCG and $1,061 million from regions other than Australia and the USA have not been recognised as it is not currently probable that the assets will be utilised based on current planned activities in those regions (2021: $497 million unrecognised DTAs). PRRT: The recoverability of PRRT deferred tax assets is primarily assessed with regard to future oil price assumptions impacting forecast future taxable pro\ufb01ts. As a result of higher actual and forecast assessable revenues supporting future recoverability of unrecognised quarantined exploration and general expenditure, the Pluto PRRT DTA has increased by $1,362 million. In determining the amount of DTA that is considered probable and eligible for recognition, forecast future taxable pro\ufb01ts are risk-adjusted where appropriate by a market premium risk rate to re\ufb02ect uncertainty inherent in long-term forecasts. A long-term bond rate of 3.2%  (31 December 2021: 1.5%) was used for the purposes of augmentation. Certain deferred tax assets on deductible temporary differences have not been recognised on the basis that deductions from future augmentation of the recognised deductible temporary difference will be sufficient to offset future taxable pro\ufb01ts. $6,523 million (2021:  $4,507 million) relates to the North West Shelf Project, $189 million (2021: $1,432 million) relates to remaining Pluto quarantined exploration expenditure and $831 million (2021: $1,071 million) relates to Wheatstone. A long-term bond rate of 3.2% (31 December 2021: 1.5%) was used for the purposes of augmentation. Had an alternative approach been used to assess recovery of the deferred tax assets, whereby future augmentation was not included in the assessment, additional deferred tax assets would be recognised, with a corresponding bene\ufb01t to tax expense. It was determined that the approach adopted provides the most meaningful information on the implications of the PRRT regime, whilst ensuring compliance with AASB 112/ IAS 12 Income Taxes. (c) Uncertain tax positions The Group has tax matters, litigation and other claims, for which the timing of resolution and potential economic out\ufb02ows are uncertain. Where the Group assesses an outcome for any tax matter, litigation or other claim as more likely than not to be accepted by the relevant tax authority, the position is adopted in the reported tax balances. Because of the complexity of some of these positions the ultimate outcome may differ from the current estimate of the position. These differences will be re\ufb02ected as increases or decreases to tax expense in the period in which new information is available. A.5  Taxes (cont.) Tax transparency code Woodside participates in the Australian Board of Taxation\u2019s voluntary Tax Transparency Code (TTC). To increase public con\ufb01dence in the contributions and compliance of corporate taxpayers, the TTC recommends public disclosure of tax information. Part A of the recommended disclosures are addressed within this Taxes note and Part B within our Sustainable Development Report, supported by additional information on our website. Recognition and measurement Current tax assets and liabilities are measured at the amount expected to be recovered from or paid to the taxation authorities. Deferred tax assets and liabilities are measured at the tax rates that are expected to apply in the period in which the liability is settled or the asset is realised. The tax rates and laws used to determine the amount are based on those that have been enacted or substantially enacted by the end of the reporting period. Income taxes relating to items recognised directly in equity are recognised in equity. Current taxes Current tax expense is the expected tax payable on the taxable income for the current year and any adjustment to tax paid in respect of previous years. Deferred taxes Deferred tax expense represents movements in the temporary differences between the carrying amount of an asset or liability in the consolidated statement of \ufb01nancial position and its tax base. With the exception of those noted below, deferred tax liabilities are recognised for all taxable temporary differences. Deferred tax assets are recognised for deductible temporary differences, unused tax losses and tax credits only if it is probable that sufficient future taxable income will be available to utilise those temporary differences and losses. Deferred tax is not recognised if the temporary difference arises from goodwill or from the initial recognition (other than in a business combination) of assets and liabilities in a transaction that affects neither accounting pro\ufb01t nor the taxable pro\ufb01t. In relation to PRRT, the impact of future augmentation on expenditure is included in the determination of future taxable pro\ufb01ts when assessing the extent to which a deferred tax asset can be recognised in the consolidated statement of \ufb01nancial position. Offsetting deferred tax balances Deferred tax assets and liabilities are offset only if there is a legally enforceable right to offset current tax assets and liabilities and when they relate to income taxes levied by the same taxation authority on either the same taxable entity or different taxable entities that the Group intends to settle its current tax assets and liabilities on a net basis. Refer to Notes E.8 and E.9 for detail on the tax consolidated groups. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfDeferredTaxesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-820": {
   "value": "Key estimates and judgements (a) Income tax classi\ufb01cation Judgement is required when determining whether a particular tax is an income tax or another type of tax. PRRT is considered, for accounting purposes, to be an income tax. Accounting for deferred tax is applied to income taxes as described above, but is not applied to other types of taxes, e.g. North West Shelf royalties, excise and levies which are recognised in cost of sales in the income statement. (b)  Deferred tax asset recognition Income tax losses and credits: Deferred tax assets (DTAs) relating to carry forward unused tax losses and credits arising from the USA Tax Consolidation Group (USA TCG) of $1,371 million (2021: nil) and $93 million (2021: nil) arising from regions other than Australia and the USA have been recognised. The Group has determined that it is probable that sufficient future taxable income will be available to utilise those losses within those regions. Refer to Note E.9(a) for details of tax consolidated groups. DTAs relating to carry forward unused tax losses and credits of  $250 million from the USA TCG, $146 million from USA entities outside of the USA TCG and $1,061 million from regions other than Australia and the USA have not been recognised as it is not currently probable that the assets will be utilised based on current planned activities in those regions (2021: $497 million unrecognised DTAs). PRRT: The recoverability of PRRT deferred tax assets is primarily assessed with regard to future oil price assumptions impacting forecast future taxable pro\ufb01ts. As a result of higher actual and forecast assessable revenues supporting future recoverability of unrecognised quarantined exploration and general expenditure, the Pluto PRRT DTA has increased by $1,362 million. In determining the amount of DTA that is considered probable and eligible for recognition, forecast future taxable pro\ufb01ts are risk-adjusted where appropriate by a market premium risk rate to re\ufb02ect uncertainty inherent in long-term forecasts. A long-term bond rate of 3.2%  (31 December 2021: 1.5%) was used for the purposes of augmentation. Certain deferred tax assets on deductible temporary differences have not been recognised on the basis that deductions from future augmentation of the recognised deductible temporary difference will be sufficient to offset future taxable pro\ufb01ts. $6,523 million (2021:  $4,507 million) relates to the North West Shelf Project, $189 million (2021: $1,432 million) relates to remaining Pluto quarantined exploration expenditure and $831 million (2021: $1,071 million) relates to Wheatstone. A long-term bond rate of 3.2% (31 December 2021: 1.5%) was used for the purposes of augmentation. Had an alternative approach been used to assess recovery of the deferred tax assets, whereby future augmentation was not included in the assessment, additional deferred tax assets would be recognised, with a corresponding bene\ufb01t to tax expense. It was determined that the approach adopted provides the most meaningful information on the implications of the PRRT regime, whilst ensuring compliance with AASB 112/ IAS 12 Income Taxes. (c) Uncertain tax positions The Group has tax matters, litigation and other claims, for which the timing of resolution and potential economic out\ufb02ows are uncertain. Where the Group assesses an outcome for any tax matter, litigation or other claim as more likely than not to be accepted by the relevant tax authority, the position is adopted in the reported tax balances. Because of the complexity of some of these positions the ultimate outcome may differ from the current estimate of the position. These differences will be re\ufb02ected as increases or decreases to tax expense in the period in which new information is available. A.5  Taxes (cont.) Tax transparency code Woodside participates in the Australian Board of Taxation\u2019s voluntary Tax Transparency Code (TTC). To increase public con\ufb01dence in the contributions and compliance of corporate taxpayers, the TTC recommends public disclosure of tax information. Part A of the recommended disclosures are addressed within this Taxes note and Part B within our Sustainable Development Report, supported by additional information on our website. Recognition and measurement Current tax assets and liabilities are measured at the amount expected to be recovered from or paid to the taxation authorities. Deferred tax assets and liabilities are measured at the tax rates that are expected to apply in the period in which the liability is settled or the asset is realised. The tax rates and laws used to determine the amount are based on those that have been enacted or substantially enacted by the end of the reporting period. Income taxes relating to items recognised directly in equity are recognised in equity. Current taxes Current tax expense is the expected tax payable on the taxable income for the current year and any adjustment to tax paid in respect of previous years. Deferred taxes Deferred tax expense represents movements in the temporary differences between the carrying amount of an asset or liability in the consolidated statement of \ufb01nancial position and its tax base. With the exception of those noted below, deferred tax liabilities are recognised for all taxable temporary differences. Deferred tax assets are recognised for deductible temporary differences, unused tax losses and tax credits only if it is probable that sufficient future taxable income will be available to utilise those temporary differences and losses. Deferred tax is not recognised if the temporary difference arises from goodwill or from the initial recognition (other than in a business combination) of assets and liabilities in a transaction that affects neither accounting pro\ufb01t nor the taxable pro\ufb01t. In relation to PRRT, the impact of future augmentation on expenditure is included in the determination of future taxable pro\ufb01ts when assessing the extent to which a deferred tax asset can be recognised in the consolidated statement of \ufb01nancial position. Offsetting deferred tax balances Deferred tax assets and liabilities are offset only if there is a legally enforceable right to offset current tax assets and liabilities and when they relate to income taxes levied by the same taxation authority on either the same taxable entity or different taxable entities that the Group intends to settle its current tax assets and liabilities on a net basis. Refer to Notes E.8 and E.9 for detail on the tax consolidated groups. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-830": {
   "value": "Key estimates and judgements (a) Income tax classi\ufb01cation Judgement is required when determining whether a particular tax is an income tax or another type of tax. PRRT is considered, for accounting purposes, to be an income tax. Accounting for deferred tax is applied to income taxes as described above, but is not applied to other types of taxes, e.g. North West Shelf royalties, excise and levies which are recognised in cost of sales in the income statement. (b)  Deferred tax asset recognition Income tax losses and credits: Deferred tax assets (DTAs) relating to carry forward unused tax losses and credits arising from the USA Tax Consolidation Group (USA TCG) of $1,371 million (2021: nil) and $93 million (2021: nil) arising from regions other than Australia and the USA have been recognised. The Group has determined that it is probable that sufficient future taxable income will be available to utilise those losses within those regions. Refer to Note E.9(a) for details of tax consolidated groups. DTAs relating to carry forward unused tax losses and credits of  $250 million from the USA TCG, $146 million from USA entities outside of the USA TCG and $1,061 million from regions other than Australia and the USA have not been recognised as it is not currently probable that the assets will be utilised based on current planned activities in those regions (2021: $497 million unrecognised DTAs). PRRT: The recoverability of PRRT deferred tax assets is primarily assessed with regard to future oil price assumptions impacting forecast future taxable pro\ufb01ts. As a result of higher actual and forecast assessable revenues supporting future recoverability of unrecognised quarantined exploration and general expenditure, the Pluto PRRT DTA has increased by $1,362 million. In determining the amount of DTA that is considered probable and eligible for recognition, forecast future taxable pro\ufb01ts are risk-adjusted where appropriate by a market premium risk rate to re\ufb02ect uncertainty inherent in long-term forecasts. A long-term bond rate of 3.2%  (31 December 2021: 1.5%) was used for the purposes of augmentation. Certain deferred tax assets on deductible temporary differences have not been recognised on the basis that deductions from future augmentation of the recognised deductible temporary difference will be sufficient to offset future taxable pro\ufb01ts. $6,523 million (2021:  $4,507 million) relates to the North West Shelf Project, $189 million (2021: $1,432 million) relates to remaining Pluto quarantined exploration expenditure and $831 million (2021: $1,071 million) relates to Wheatstone. A long-term bond rate of 3.2% (31 December 2021: 1.5%) was used for the purposes of augmentation. Had an alternative approach been used to assess recovery of the deferred tax assets, whereby future augmentation was not included in the assessment, additional deferred tax assets would be recognised, with a corresponding bene\ufb01t to tax expense. It was determined that the approach adopted provides the most meaningful information on the implications of the PRRT regime, whilst ensuring compliance with AASB 112/ IAS 12 Income Taxes. (c) Uncertain tax positions The Group has tax matters, litigation and other claims, for which the timing of resolution and potential economic out\ufb02ows are uncertain. Where the Group assesses an outcome for any tax matter, litigation or other claim as more likely than not to be accepted by the relevant tax authority, the position is adopted in the reported tax balances. Because of the complexity of some of these positions the ultimate outcome may differ from the current estimate of the position. These differences will be re\ufb02ected as increases or decreases to tax expense in the period in which new information is available. A.5  Taxes (cont.) Tax transparency code Woodside participates in the Australian Board of Taxation\u2019s voluntary Tax Transparency Code (TTC). To increase public con\ufb01dence in the contributions and compliance of corporate taxpayers, the TTC recommends public disclosure of tax information. Part A of the recommended disclosures are addressed within this Taxes note and Part B within our Sustainable Development Report, supported by additional information on our website. Recognition and measurement Current tax assets and liabilities are measured at the amount expected to be recovered from or paid to the taxation authorities. Deferred tax assets and liabilities are measured at the tax rates that are expected to apply in the period in which the liability is settled or the asset is realised. The tax rates and laws used to determine the amount are based on those that have been enacted or substantially enacted by the end of the reporting period. Income taxes relating to items recognised directly in equity are recognised in equity. Current taxes Current tax expense is the expected tax payable on the taxable income for the current year and any adjustment to tax paid in respect of previous years. Deferred taxes Deferred tax expense represents movements in the temporary differences between the carrying amount of an asset or liability in the consolidated statement of \ufb01nancial position and its tax base. With the exception of those noted below, deferred tax liabilities are recognised for all taxable temporary differences. Deferred tax assets are recognised for deductible temporary differences, unused tax losses and tax credits only if it is probable that sufficient future taxable income will be available to utilise those temporary differences and losses. Deferred tax is not recognised if the temporary difference arises from goodwill or from the initial recognition (other than in a business combination) of assets and liabilities in a transaction that affects neither accounting pro\ufb01t nor the taxable pro\ufb01t. In relation to PRRT, the impact of future augmentation on expenditure is included in the determination of future taxable pro\ufb01ts when assessing the extent to which a deferred tax asset can be recognised in the consolidated statement of \ufb01nancial position. Offsetting deferred tax balances Deferred tax assets and liabilities are offset only if there is a legally enforceable right to offset current tax assets and liabilities and when they relate to income taxes levied by the same taxation authority on either the same taxable entity or different taxable entities that the Group intends to settle its current tax assets and liabilities on a net basis. Refer to Notes E.8 and E.9 for detail on the tax consolidated groups. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDeferredIncomeTaxExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-765": {
   "value": "B.2  Exploration and evaluation Asia Paci\ufb01c Americas Africa Total US$m US$m US$m US$m Year ended 31 December 2022 Carrying amount at 1 January 2022 546  - 68  614 Acquisitions through business combination1 - 180  - 180 Additions 19  204  17  240 Disposals - (10) - (10) Amortisation of licence acquisition costs - (8) (2) (10) Expensed2 - (126) (45) (171) Transferred exploration and evaluation (36) - - (36) Carrying amount at 31 December 2022 529  240  38  807 Year ended 31 December 20213 Carrying amount at 1 January 2021 1,981  - 64  2,045 Additions 494  - 7  501 Amortisation of licence acquisition costs - - (3) (3) Expensed2 (265) - - (265) Transferred exploration and evaluation (1,664) - - (1,664) Carrying amount at 31 December 2021 546  - 68  614 Exploration commitments Year ended 31 December 2022 1  1  27  29 Year ended 31 December 20213 16  1  77  94 1.  Acquisitions through business combination have been recognised on a provisional basis. Adjustments will be made to the provisional amounts if new information is obtained within 12 months from the acquisition date. Refer to Note B.5 for details. 2.  $125 million (2021: $56 million) relates to costs of unsuccessful wells. For the year ended 31 December 2021, $209 million relates to capitalised costs written off due to the Group\u2019s decision to withdraw its interests in Myanmar. 3.  Oceania and Asia have been presented within Asia Paci\ufb01c for the year ended 31 December 2022. The 2021 amounts have been reclassi\ufb01ed to be presented on the same basis. Recognition and measurement Expenditure on exploration and evaluation is accounted for in accordance with the area of interest method. Areas of interest are based on a geographical area for which the rights of tenure are current. All exploration and evaluation expenditure, including general permit activity, geological and geophysical costs and new venture activity costs, is expensed as incurred except for the following: \u2022  where the expenditure relates to an exploration discovery for which the assessment of the existence or otherwise of economically recoverable hydrocarbons is not yet complete; or \u2022  where the expenditure is expected to be recouped through successful exploitation of the area of interest, or alternatively, by its sale. The costs of acquiring interests in new exploration and evaluation licences are capitalised. The costs of drilling exploration wells are initially capitalised pending the results of the well. Costs are expensed where the well does not result in the successful discovery of economically recoverable hydrocarbons and the recognition of an area of interest. Subsequent to the recognition of an area of interest, all further evaluation costs relating to that area of interest are capitalised. Upon approval for the commercial development of an area of interest, accumulated expenditure for the area of interest is transferred to oil and gas properties. In the consolidated statement of cash \ufb02ows, those cash \ufb02ows associated with capitalised exploration and evaluation expenditure, including unsuccessful wells, are classi\ufb01ed as cash \ufb02ows used in investing activities. Exploration commitments The Group has exploration expenditure obligations which are contracted for, but not provided for in the \ufb01nancial statements. These obligations may be varied from time to time and are expected to be ful\ufb01lled in the normal course of the Group\u2019s operations. Impairment Refer to Note B.4 for details on impairment, including any write-offs. Key estimates and judgements (a) Area of interest Typically, an area of interest (AOI) is de\ufb01ned by the Group as an individual geographical area whereby the presence of hydrocarbons is considered favourable or proved to exist. The Group has established criteria to recognise and maintain an AOI. (b) Transfer to projects in development Development activities commence after project sanctioning by the appropriate level of management. Judgement is applied by management in determining when the project is technically feasible and economically viable to transfer to projects in development. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfExplorationAndEvaluationAssetsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-796": {
   "value": "Recognition and measurement Expenditure on exploration and evaluation is accounted for in accordance with the area of interest method. Areas of interest are based on a geographical area for which the rights of tenure are current. All exploration and evaluation expenditure, including general permit activity, geological and geophysical costs and new venture activity costs, is expensed as incurred except for the following: \u2022  where the expenditure relates to an exploration discovery for which the assessment of the existence or otherwise of economically recoverable hydrocarbons is not yet complete; or \u2022  where the expenditure is expected to be recouped through successful exploitation of the area of interest, or alternatively, by its sale. The costs of acquiring interests in new exploration and evaluation licences are capitalised. The costs of drilling exploration wells are initially capitalised pending the results of the well. Costs are expensed where the well does not result in the successful discovery of economically recoverable hydrocarbons and the recognition of an area of interest. Subsequent to the recognition of an area of interest, all further evaluation costs relating to that area of interest are capitalised. Upon approval for the commercial development of an area of interest, accumulated expenditure for the area of interest is transferred to oil and gas properties. In the consolidated statement of cash \ufb02ows, those cash \ufb02ows associated with capitalised exploration and evaluation expenditure, including unsuccessful wells, are classi\ufb01ed as cash \ufb02ows used in investing activities. Exploration commitments The Group has exploration expenditure obligations which are contracted for, but not provided for in the \ufb01nancial statements. These obligations may be varied from time to time and are expected to be ful\ufb01lled in the normal course of the Group\u2019s operations. Impairment Refer to Note B.4 for details on impairment, including any write-offs. Key estimates and judgements (a) Area of interest Typically, an area of interest (AOI) is de\ufb01ned by the Group as an individual geographical area whereby the presence of hydrocarbons is considered favourable or proved to exist. The Group has established criteria to recognise and maintain an AOI. (b) Transfer to projects in development Development activities commence after project sanctioning by the appropriate level of management. Judgement is applied by management in determining when the project is technically feasible and economically viable to transfer to projects in development. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForExplorationAndEvaluationExpenditures",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-766": {
   "value": "Land and buildings Transferred exploration and evaluation Plant and equipment Projects in development Total US$m US$m US$m US$m US$m Year ended 31 December 2022 Carrying amount at 1 January 2022 739  526  12,465  4,919  18,649 Acquisitions through business combinations1 64  - 11,952  7,337  19,353 Additions2 - - (508) 4,332  3,824 Disposals at written down value (3) (10) (32) - (45) Depreciation and amortisation (54) (107) (2,637) - (2,798) Impairment reversal3 87  30  783  - 900 Completions and transfers 7  42  1,034  (1,047) 36 Carrying amount at 31 December 2022 840  481  23,057  15,541  39,919 At 31 December 2022 Historical cost 1,765  1,538  45,273  15,937  64,513 Accumulated depreciation and impairment (925) (1,057) (22,216) (396) (24,594) Net carrying amount 840  481  23,057  15,541  39,919 Year ended 31 December 20214 Carrying amount at 1 January 2021 749  431  12,091  2,195  15,466 Additions - - 13  2,321  2,334 Disposals at written down value (2) - (6) (22) (30) Depreciation and amortisation (51) (79) (1,449) - (1,579) Impairment losses3 (10) - - - (10) Impairment reversal3 44  66  911  37  1,058 Completions and transfers 11  108  905  640  1,664 Transfer to assets held for sale5 (2) - - (252) (254) Carrying amount at 31 December 2021 739  526  12,465  4,919  18,649 At 31 December 20214 Historical cost 1,701  1,495  32,796  5,321  41,313 Accumulated depreciation and impairment (962) (969) (20,331) (402) (22,664) Net carrying amount 739  526  12,465  4,919  18,649 1.  Acquisitions through business combination have been recognised on a provisional basis. Adjustments will be made to the provisional amounts if new information is obtained within 12 months from the acquisition date. Refer to Note B.5 for details. Projects in development include the fair value ascribed to future phases of certain projects acquired through business combinations. 2.  Includes $3,904 million of capital additions and $294 million of capitalised borrowing costs offset by $374 million following changes in restoration provision assumptions. 3.  Refer to Note B.4 for details on impairment losses and impairment reversals. 4.  Oil and gas properties includes other plant and equipment which is no longer separately presented in the consolidated statement of \ufb01nancial position. The 2021 amounts have been reclassi\ufb01ed to be presented on the same basis. 5.  Refer to Note B.7 for details on assets held for sale. B.3  Oil and gas properties Key estimates and judgements (a) Reserves The estimation of reserves requires signi\ufb01cant management judgement and interpretation of complex geological and geophysical models in order to make an assessment of the size, shape, depth and quality of reservoirs, and their anticipated recoveries. Estimates of oil and natural gas reserves are used to calculate depreciation and amortisation charges for the Group\u2019s oil and gas properties. Judgement is used in determining the economic reserve base applied to each asset. Typically, late life oil assets use proved reserves. Estimates are reviewed at least annually or when there are changes in the economic circumstances impacting speci\ufb01c assets or asset groups. These changes may impact depreciation, asset carrying values, restoration provisions and deferred tax balances. If proved plus probable (2P) reserves estimates are revised downwards, earnings could be affected by higher depreciation expense or an immediate write-down of the asset\u2019s carrying value. (b) Depreciation and amortisation Judgement is required to determine when assets are available for use to commence depreciation and amortisation. Depreciation and amortisation generally commences on \ufb01rst production. B.3  Oil and gas properties (cont.) Recognition and measurement Oil and gas properties are stated at cost less accumulated depreciation and impairment charges. Oil and gas properties include the costs to acquire, construct, install or complete production and infrastructure facilities such as pipelines and platforms, capitalised borrowing costs, transferred exploration and evaluation assets, development wells and the estimated cost of dismantling and restoration. Subsequent capital costs, including major maintenance, are included in the asset\u2019s carrying amount only when it is probable that future economic bene\ufb01ts associated with the item will \ufb02ow to the Group and the cost of the item can be reliably measured. Depreciation and amortisation Oil and gas properties are depreciated to their estimated residual values at rates based on their expected useful lives. Transferred exploration and evaluation and offshore plant and equipment are depreciated using the unit of production basis over proved plus probable reserves or proved reserves for late life assets. The depreciable amount for the unit of production basis excludes future development costs necessary to bring probable reserves into production. For certain offshore assets, methodologies using proved and probable reserves are adjusted to best re\ufb02ect the expected pattern of consumption. Onshore plant and equipment is depreciated using a straight-line basis over the lesser of useful life and the life of proved plus probable reserves. On a straight-line basis the assets have an estimated useful life of 5-50 years. All other items of oil and gas properties are depreciated using the straight-line method over their useful life. They are depreciated as follows: \u2022  Buildings \u2013 24-50 years; \u2022  Plant and equipment \u2013 2-40 years; and \u2022  Land is not depreciated. Impairment Refer to Note B.4 for details on impairment. Capital commitments The Group has capital expenditure commitments contracted for, but not provided for in the \ufb01nancial statements, of $7,762 million as at 31 December 2022 (2021: $7,875 million). Capital expenditure commitments relate predominantly to the Scarborough and Sangomar projects. ",
   "dimensions": {
    "concept": "woodsideenergygroupltd:DisclosureOfOilAndGasProperties",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-797": {
   "value": "Key estimates and judgements (a) Reserves The estimation of reserves requires signi\ufb01cant management judgement and interpretation of complex geological and geophysical models in order to make an assessment of the size, shape, depth and quality of reservoirs, and their anticipated recoveries. Estimates of oil and natural gas reserves are used to calculate depreciation and amortisation charges for the Group\u2019s oil and gas properties. Judgement is used in determining the economic reserve base applied to each asset. Typically, late life oil assets use proved reserves. Estimates are reviewed at least annually or when there are changes in the economic circumstances impacting speci\ufb01c assets or asset groups. These changes may impact depreciation, asset carrying values, restoration provisions and deferred tax balances. If proved plus probable (2P) reserves estimates are revised downwards, earnings could be affected by higher depreciation expense or an immediate write-down of the asset\u2019s carrying value. (b) Depreciation and amortisation Judgement is required to determine when assets are available for use to commence depreciation and amortisation. Depreciation and amortisation generally commences on \ufb01rst production. B.3  Oil and gas properties (cont.) Recognition and measurement Oil and gas properties are stated at cost less accumulated depreciation and impairment charges. Oil and gas properties include the costs to acquire, construct, install or complete production and infrastructure facilities such as pipelines and platforms, capitalised borrowing costs, transferred exploration and evaluation assets, development wells and the estimated cost of dismantling and restoration. Subsequent capital costs, including major maintenance, are included in the asset\u2019s carrying amount only when it is probable that future economic bene\ufb01ts associated with the item will \ufb02ow to the Group and the cost of the item can be reliably measured. Depreciation and amortisation Oil and gas properties are depreciated to their estimated residual values at rates based on their expected useful lives. Transferred exploration and evaluation and offshore plant and equipment are depreciated using the unit of production basis over proved plus probable reserves or proved reserves for late life assets. The depreciable amount for the unit of production basis excludes future development costs necessary to bring probable reserves into production. For certain offshore assets, methodologies using proved and probable reserves are adjusted to best re\ufb02ect the expected pattern of consumption. Onshore plant and equipment is depreciated using a straight-line basis over the lesser of useful life and the life of proved plus probable reserves. On a straight-line basis the assets have an estimated useful life of 5-50 years. All other items of oil and gas properties are depreciated using the straight-line method over their useful life. They are depreciated as follows: \u2022  Buildings \u2013 24-50 years; \u2022  Plant and equipment \u2013 2-40 years; and \u2022  Land is not depreciated. Impairment Refer to Note B.4 for details on impairment. Capital commitments The Group has capital expenditure commitments contracted for, but not provided for in the \ufb01nancial statements, of $7,762 million as at 31 December 2022 (2021: $7,875 million). Capital expenditure commitments relate predominantly to the Scarborough and Sangomar projects. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForOilAndGasAssetsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-821": {
   "value": "Recognition and measurement Oil and gas properties are stated at cost less accumulated  depreciation and impairment charges. Oil and gas properties  include the costs to acquire, construct, install or complete  production and infrastructure facilities such as pipelines and  platforms, capitalised borrowing costs, transferred exploration  and evaluation assets, development wells and the estimated  cost of dismantling and restoration. Subsequent capital costs, including major maintenance, are  included in the asset\u2019s carrying amount only when it is probable  that future economic bene\ufb01ts associated with the item will \ufb02ow  to the Group and the cost of the item can be reliably measured. Depreciation and amortisation Oil and gas properties are depreciated to their estimated  residual values at rates based on their expected useful lives. Transferred exploration and evaluation and offshore plant and  equipment are depreciated using the unit of production basis  over proved plus probable reserves or proved reserves for late  life assets. The depreciable amount for the unit of production  basis excludes future development costs necessary to bring  probable reserves into production. For certain offshore assets,  methodologies using proved and probable reserves are adjusted  to best re\ufb02ect the expected pattern of consumption. Onshore  plant and equipment is depreciated using a straight-line basis  over the lesser of useful life and the life of proved plus probable  reserves. On a straight-line basis the assets have an estimated  useful life of 5-50 years. All other items of oil and gas properties are depreciated  using the straight-line method over their useful life. They are  depreciated as follows: \u2022  Buildings \u2013 24-50 years; \u2022  Plant and equipment \u2013 2-40 years; and \u2022  Land is not depreciated. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForPropertyPlantAndEquipmentExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-822": {
   "value": "Capital commitments The Group has capital expenditure commitments contracted  for, but not provided for in the \ufb01nancial statements, of  $7,762 million as at 31 December 2022 (2021: $7,875 million).  Capital expenditure commitments relate predominantly to the  Scarborough and Sangomar projects.  ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCommitmentsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-767": {
   "value": "B.4   Impairment of exploration and evaluation, oil and gas properties and goodwill Exploration and evaluation Impairment testing The recoverability of the carrying amount of exploration and evaluation assets is dependent on successful development and commercial exploitation, or alternatively sale of the respective AOI. Each AOI is reviewed half-yearly to determine whether economic quantities of hydrocarbons have been found, or whether further exploration and evaluation work is underway or planned to support continued carry forward of capitalised costs. Where a potential impairment is indicated for an AOI, an assessment is performed using a fair value less costs to dispose (FVLCD) method to determine its recoverable amount. Upon approval for commercial development, exploration and evaluation assets are assessed for impairment before they are transferred to oil and gas properties. Impairment calculations The recoverable amounts of exploration and evaluation assets are determined using FVLCD, as there is no value in use (VIU). Costs to dispose are the incremental costs directly attributable to the disposal of an asset, excluding \ufb01nance costs and income tax expense. If the carrying amount of an AOI exceeds its recoverable amount, the AOI is written down to its recoverable amount and an impairment loss is recognised in the consolidated income statement. For assets previously impaired, if the recoverable amount exceeds the carrying amount, the impairment is reversed, but only to the extent that the asset\u2019s carrying amount does not exceed the carrying amount that would have been recognised if no impairment had occurred. Oil and gas properties Impairment testing The carrying amounts of oil and gas properties are assessed half-yearly to determine whether there is an indicator of impairment or impairment reversal for those assets which have previously been impaired. Indicators of impairment and impairment reversals include changes in reserves, expected future sales prices or costs. Oil and gas properties are assessed for impairment indicators and impairments on a cash-generating unit (CGU) basis. CGUs are determined as offshore and onshore facilities, infrastructure and associated oil and/or gas \ufb01elds. If there is an indicator of impairment or impairment reversal for a CGU, its recoverable amount is calculated and compared with the CGU\u2019s carrying value (refer to impairment calculations below). Goodwill For the purpose of impairment testing, goodwill acquired in a business combination is, from the acquisition date, allocated to each of the Group\u2019s cash-generating units (CGUs) that are expected to bene\ufb01t from the combination, irrespective of whether other assets or liabilities of the acquiree are assigned to those units. Goodwill is tested for impairment at least annually and more frequently if events or changes in circumstances indicate that it might be impaired. Impairment of goodwill is determined by assessing the recoverable amount of each CGU to which the goodwill relates and comparing it with its carrying value, which includes deferred taxes (refer to impairment calculations below and Note B.5). When part of an operation is disposed of, any goodwill associated with the disposed operation is included in the carrying amount of the operation in determining the gain or loss on disposal. Goodwill and oil and gas impairment calculations The recoverable amount of an asset or CGU is determined as the higher of its VIU and FVLCD. VIU is determined by estimating future cash \ufb02ows after taking into account the risks speci\ufb01c to the asset and discounting to present value using an appropriate discount rate. FVLCD is the price that would be received to sell the asset in an orderly transaction between market participants and does not re\ufb02ect the effects of factors that may be speci\ufb01c to the Group. In determining FVLCD, recent market transactions are considered. If no such transactions can be identi\ufb01ed, an appropriate valuation model, such as discounted cash \ufb02ow techniques, are applied on a post-tax basis using an appropriate discount rate and estimates are made about the assumptions market participants would use when pricing the asset or CGU. If the carrying amount of an asset or CGU, including any allocated goodwill, exceeds its recoverable amount, the asset or CGU is written down to its recoverable amount and an impairment loss is recognised in the consolidated income statement. Any impairment losses are \ufb01rst allocated to reduce the carrying amount of any goodwill allocated, with the remaining impairment losses allocated to the relevant assets. If the recoverable amount of an asset or CGU exceeds its carrying amount, and that asset has previously been impaired, the impairment is reversed. The carrying amount of the asset or CGU is increased to its recoverable amount, but only to the extent that the carrying amount does not exceed the value that would have been determined, net of depreciation or amortisation, if no impairment had been recognised. Impairments of goodwill are not reversed. B.4   Impairment of exploration and evaluation, oil and gas properties and goodwill (cont.) For the year ended 31 December 2022 Goodwill allocation The Group performed its annual goodwill impairment test as at 31 December 2022. The carrying amount of goodwill allocated to each CGU, or groups of CGUs and excess recoverable amounts are as follows: Segment CGU Goodwill carrying amount1 Excess of recoverable amount over CGU carrying amount2 US$m US$m Australia Pluto-Scarborough 2,955  7,656 Australia NWS Gas 394 1,399 International Shenzi 469  401 International Atlantis  513  189 International Other goodwill 283 107 Total 4,614 1.  Carrying amount of goodwill as at 31 December 2021 was nil. 2.  Amounts are with reference to the total CGU value including goodwill. Other goodwill of $283 million (2021: nil) has been allocated across a number of CGUs within the International segment. This represents less than one percent of net assets as at 31 December 2022. Recognised impairment and impairment reversals As at 31 December 2022, the Group assessed each AOI and CGU to determine whether an indicator of impairment or impairment reversal existed. The Group identi\ufb01ed the following indicators of impairment reversals: \u2022  Wheatstone CGU \u2013 revision in short- and long-term LNG price assumptions and updated cost and production pro\ufb01les. For CGUs where goodwill has been allocated, no impairment was recognised as the recoverable amount exceeds the carrying amount of the CGU. An impairment reversal was recognised for Wheatstone (refer to Note A.1), with results as follows: Impairment reversal Oil and gas properties Recoverable amount Land and buildings Transferred exploration and  evaluation Plant and equipment Total Segment CGU US$m US$m US$m US$m US$m Australia Wheatstone 3,456 87 30 783 900 Recoverable amounts have been determined using the FVLCD method using discounted cash \ufb02ow projections, classi\ufb01ed as Level 3 on the fair value hierarchy. The carrying amount of each CGU includes all assets allocated to the respective CGU. Refer to key estimates and judgements for further details. Sensitivity analysis Recoverable amount valuations are sensitive to changes in certain key accounting estimates and judgements (refer to key estimates and judgements for further details). Reasonable possible changes to these key assumptions are set out below: \u2022  Post tax discount rate \u2013 plus or minus 1.5% (representing a change of 150 basis points) \u2022  Commodity pricing \u2013 plus or minus 10% \u2022  Foreign exchange (FX) rate \u2013 plus or minus 12% \u2022  Production volumes \u2013 plus or minus 4% Management\u2019s analysis on the impact of reasonable possible changes to these assumptions on recoverable amounts is detailed below. B.4  Impairment of exploration and evaluation, oil and gas properties and goodwill (cont.) For the year ended 31 December 2022 (cont.) Sensitivity analysis (cont.) CGUs with impairment or impairment reversals Changes in the following key assumptions have been estimated to result in a higher or lower carrying amount1 than what was determined as at 31 December 2022: Sensitivity (US$m)2 CGU Discount rate increase\u00b3 Discount rate decrease\u00b3 Brent price increase Brent price decrease FX increase FX increase Production increase\u2074 Production decrease\u2074 Wheatstone (117) 127 294 (294) (79) 79 116 (43) 1.  Increases to carrying amounts are limited to historical impairment losses recognised, net of depreciation and amortisation, that would have been recognised had no impairment taken place. 2.  The sensitivities represent the reasonable possible changes to discount rate, oil price, FX and production volumes assumptions. 3.  The relationship between the discount rate and the carrying amount is non-linear and as such, sensitivities are unlikely to result in a symmetrical impact. Due to the non- linear relationship, the impact of changing the discount rate is likely to be greater at a lower discount rate than at a higher discount rate. 4.  The relationship between production and the carrying amount is non-linear due to the proportion of \ufb01xed costs. Sensitivities are therefore unlikely to result in a symmetrical impact. A signi\ufb01cant change in production volumes would typically require a reassessment of the asset concept and should not be interpreted in isolation. A change in any of the above assumptions would likely have an impact on other assumptions which, when considered together, may offset. This does not incorporate decisions management may take in order to mitigate the change in assumptions. CGUs with goodwill The valuation of CGUs with goodwill are most sensitive to changes in commodity prices and discount rates. Reasonably possible changes in these estimates which could result in the estimated recoverable amount being equal to the carrying amount, assuming all other variables are held constant, are as follows: CGU Commodity price1 Nominal discount rate % change (absolute terms) Oil and gas properties Pluto-Scarborough N/A\u00b2 N/A\u00b2 Oil and gas properties NWS Gas N/A\u00b2 N/A\u00b2 Oil and gas properties Shenzi (7%) N/A \u00b2 Oil and gas properties Atlantis (2%) 10% 1.  Brent price applies to Pluto-Scarborough and NWS Gas. WTI price (Brent - $3/bbl) applies to Shenzi and Atlantis. 2.  Management considers there to be no reasonably possible change in the respective estimate which, in isolation, would result in the estimated recoverable amount being equal to the carrying amount. A change in any of the above assumptions would have an impact on other assumptions which when considered together may offset. This does not incorporate decisions management may take in order to mitigate the change in assumptions. Management considers there to be no reasonably possible changes in production volumes, carbon prices or foreign exchange rates that would, in isolation result in the estimated recoverable amount being equal to the carrying amount. Analysis of key assumptions which could result in the carrying value to equal the recoverable value provides a basis to assess the magnitude of a reasonable possible change to the carrying amounts of respective CGUs. Key estimates and judgements CGU determination Identi\ufb01cation of a CGU requires management judgement. In determining CGUs for acquired assets during the reporting period, management has assessed based on the smallest group of assets that generate signi\ufb01cant cash in\ufb02ows that are independent from other assets or groups of assets. Allocation of goodwill Allocation of goodwill to the relevant CGUs requires management judgement. The goodwill arising from the merger has been allocated to relevant CGUs which are expected to bene\ufb01t from the expected synergies as a result of the merger. Recoverable amount calculation key assumptions In determining the recoverable amount of CGUs, estimates are made regarding the present value of future cash \ufb02ows when determining the FVLCD. These estimates require signi\ufb01cant management judgement and are subject to risk and uncertainty, and hence changes in economic conditions can also affect the assumptions used and the rates used to discount future cash \ufb02ow estimates. The basis for each estimate used to determine recoverable amounts as at 31 December 2022 is set out below: \u2022  Resource estimates \u2013 2P and a portion of 2C reserves (where applicable) for oil and gas properties. The reserves are as disclosed in the Reserves and Resources Statement in the 31 December 2022 Annual Report. \u2022  In\ufb02ation rate \u2013 an in\ufb02ation rate of 2.0% has been applied for US based assets and 2.5% for Australian based assets. \u2022  Foreign exchange rates \u2013 a rate of $0.75 US$:AU$ is based on management\u2019s view of long-term exchange rates. For the year ended 31 December 2021 Recognised impairment and impairment reversals As at 31 December 2021, the Group identi\ufb01ed the following indicators for impairment and impairment reversals: \u2022  Pluto-Scarborough and Wheatstone CGU \u2013 a reduction of 2P total reserves within the Greater Pluto and Wheatstone reserves and resources estimates. \u2022  Pluto-Scarborough CGU \u2013 additional value generated by Scarborough and Pluto Train 2, which have been combined with Pluto into a new Pluto-Scarborough CGU following the \ufb01nal investment decision for Scarborough and Pluto Train 2 in November 2021. \u2022  North West Shelf CGU \u2013 updated cost and production pro\ufb01les, including the impact of third-party processing agreements, and short-term pricing assumptions. \u2022  NWS Oil (Okha) CGU \u2013 the reclassi\ufb01cation to a late life oil asset due to natural reservoir decline and short-term pricing assumptions. No impairment was recognised for Wheatstone and NWS Oil (Okha) as the recoverable amount exceeds the carrying amount of the CGU. Impairment reversals were recognised for Pluto-Scarborough and NWS Gas (refer to Note A.1). The results were as follows: Impairment reversal Oil and gas properties Recoverable amount Land and buildings Transferred exploration and  evaluation Plant and equipment Projects in development Total Segment CGU US$m US$m US$m US$m US$m US$m Producing and Development Pluto-Scarborough  17,474   42   53   563  24  682 Producing North West Shelf 2,425 2 13 348 13 376 Total 19,899 44 66 911 37 1,058 The recoverable amounts were determined using the VIU method. The carrying amounts of the CGUs include all assets allocated to the CGU. Refer to key estimates and judgements for further details. Key estimates and judgements (cont.) Recoverable amount calculation key assumptions (cont.) \u2022  Discount rates \u2013 a range of post-tax discount rates between 8% and 11.5% for CGUs has been applied. The discount rate re\ufb02ects an assessment of the risks speci\ufb01c to the asset. \u2022  Carbon pricing \u2013 a long-term price of US$80/tonne of emissions (real terms 2022) is based on management\u2019s assumptions on carbon cost pricing and incorporates an evaluation of climate risk. This is applicable to Australian emissions that exceed facility- speci\ufb01c baselines in accordance with Australian regulations, as well as global emissions that exceed voluntary corporate net emissions targets. Woodside continues to monitor the uncertainty around climate change risks and will revise carbon pricing assumptions accordingly. Refer to Climate change and energy transition section within the basis of preparation for further information. \u2022  LNG price \u2013 the majority of LNG sales contracts are linked to an oil price marker; accordingly the LNG prices used are consistent with oil price assumptions. \u2022  Brent oil prices \u2013 derived from long-term views of global supply and demand, building upon past experience of the industry and consistent with external sources. Prices are adjusted for premiums and discounts based on the nature and quality of the product. Brent oil price estimates have considered the risk of climate policies along with other factors such as industry investment and cost trends. There is signi\ufb01cant uncertainty around how society will respond to the climate challenge; Woodside\u2019s pricing assumptions re\ufb02ect a \u2018best estimate\u2019 scenario in which global governments pursue decarbonisation as well as other goals such as energy security and economic development. As with carbon pricing, Woodside continues to monitor this uncertainty and will revise its oil pricing assumptions accordingly in its transition to a lower carbon economy. Further information on climate change risk is provided  in the Climate change and energy transition section within the basis of preparation. The nominal Brent oil prices (US$/bbl) used were: 2023 2024 2025 2026 2027 2028 31 December 20221 87 78 74 76 77 79 31 December 20212 71 68 69 70 72 73 1.   Long-term oil prices are based on US$70/bbl (2022 real terms) from 2025 and prices are escalated at 2.0% onwards. 2.  Long-term oil prices are based on US$65/bbl (2022 real terms) from 2024 and prices are escalated at 2.0% onwards. B.4   Impairment of exploration and evaluation, oil and gas properties and goodwill (cont.) For the year ended 31 December 2022 (cont.) B.4   Impairment of exploration and evaluation, oil and gas properties and goodwill (cont.) For the year ended 31 December 2021 (cont.) Sensitivity analysis Changes in the following key assumptions were estimated to result in a higher or lower carrying amounts1 than what was determined as at 31 December 2021: Sensitivity (US$m)2 Discount rate: increase of 1% 3,4 Discount rate: decrease of 1% Brent price: increase of 10% Brent price: decrease of 10% FX:  increase of 12%5 FX:  decrease of 12% Oil and gas properties Producing and Development Pluto- Scarborough - - - - - - Producing North West Shelf - - - (13) - - Wheatstone (159) 178 438 (438) (122) 122 NWS Oil (Okha) (4) 4 39 (39) (28) 28 1.  Increases to carrying amounts are limited to historical impairment losses recognised, net of depreciation and amortisation that would have been incurred had no impairment taken place. 2.  The sensitivities represent reasonable possible changes to the discount rate, oil price and FX assumptions. 3.  A change of 1% represents 100 basis points. 4.  The relationship between the discount rate and carrying amount is non-linear and as such, the sensitivities are unlikely to result in a symmetrical impact. Due to the non-linear relationship, the impact of changing the discount rate is likely to be greater at a lower discount rate than at a higher discount rate. 5.  FX sensitivity of +12%/-12% was determined based on historical 5-year standard deviation of AU$/US$. Impairment on non-current assets held for sale The sale of a portion of the Wheatstone Construction Village resulted in an impairment loss of $10 million as the asset\u2019s carrying value exceeded its FVLCD, which was determined based on the underlying sale agreements, classi\ufb01ed as Level 3 on the fair value hierarchy. For the year ended 31 December 2021, an impairment loss of $10 million was recognised in the Australia operating segment of Note A.1. Key estimates and judgements CGU determination Identi\ufb01cation of a CGU requires management judgement. For the year ended 31 December 2021, management has determined that the Scarborough and Pluto Train 2 development concept integrates with the existing Pluto onshore assets and is the smallest group of assets that generate signi\ufb01cant cash in\ufb02ows that are independent from other assets or group of assets. Recoverable amount calculation key assumptions In determining the recoverable amount of CGUs, estimates are made regarding the present value of future cash \ufb02ows when determining the VIU. These estimates require signi\ufb01cant management judgement and are subject to risk and uncertainty, and hence changes in economic conditions can also affect the assumptions used and  the rates used to discount future cash \ufb02ow estimates. The basis for each estimate used to determine recoverable amounts as at 31 December 2021 is set out below: \u2022  Resource estimates \u2013 2P reserves for oil and gas properties, except for NWS Oil (Okha) which is based on 1P reserves due to the reclassi\ufb01cation to a late life asset. The reserves are as disclosed in the Reserves and resources statement in the 31 December 2021 Annual Report on pages 55-59. \u2022  In\ufb02ation rate \u2013 an in\ufb02ation rate of 2.0% has been applied. \u2022  Foreign exchange rates \u2013 a rate of $0.75 US$:AU$ is based on management\u2019s view of long-term exchange rates. \u2022  Discount rates \u2013 a range of pre-tax discount rates between 8.9% and 11.6% (post-tax discount rate 7.5%-8.5%) for CGUs has been applied. The discount rate re\ufb02ects an assessment of the risks speci\ufb01c to the asset. \u2022  An evaluation of climate risk is re\ufb02ected in Woodside's assumptions on carbon cost pricing, including a long-term Australian carbon price of US$80/tonne of emissions (real terms 2022). This is applicable to Australian emissions that exceed facility-speci\ufb01c baselines in accordance with Australian regulations, as well as global emissions that exceed voluntary corporate net emissions targets. Woodside continues to monitor the uncertainty around climate change risks and will revise carbon pricing assumptions accordingly. \u2022  LNG price \u2013 the majority of LNG sales contracts are linked to an oil price marker; accordingly the LNG prices used are consistent with oil price assumptions. \u2022  Brent oil prices \u2013 derived from long-term views of global supply and demand, building upon past experience of the industry and consistent with external sources. Prices are adjusted for premiums and discounts based on the nature and quality of the product. Brent oil price estimates have considered the risk of climate policies along with other factors such as industry investment and cost trends. There is signi\ufb01cant uncertainty around how society will respond to the climate challenge; Woodside\u2019s pricing assumptions re\ufb02ect a \u2018most-likely\u2019 scenario in which global governments pursue decarbonisation as well as other goals such as energy security and economic development. As with carbon pricing, Woodside continues to monitor this uncertainty and will revise its oil pricing assumptions accordingly in its transition to a lower carbon economy. Further information on climate change risk is provided  in Woodside\u2019s Climate Report 2021. The nominal Brent oil prices  (US$/bbl) used were: 2022 2023 2024 2025 2026 2027 31 December 20211 73 71 68 69 70 72 30 June 20202 57 62 67 72 73 75 1.  Based on US$65/bbl (2022 real terms) from 2024 with prices escalated at 2.0% annually thereafter. 2.  Based on US$65/bbl (2020 real terms) from 2025 with prices escalated at 2.0% annually thereafter. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfImpairmentOfAssetsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-798": {
   "value": "B.4   Impairment of exploration and evaluation, oil and gas properties and goodwill Exploration and evaluation Impairment testing The recoverability of the carrying amount of exploration and evaluation assets is dependent on successful development and commercial exploitation, or alternatively sale of the respective AOI. Each AOI is reviewed half-yearly to determine whether economic quantities of hydrocarbons have been found, or whether further exploration and evaluation work is underway or planned to support continued carry forward of capitalised costs. Where a potential impairment is indicated for an AOI, an assessment is performed using a fair value less costs to dispose (FVLCD) method to determine its recoverable amount. Upon approval for commercial development, exploration and evaluation assets are assessed for impairment before they are transferred to oil and gas properties. Impairment calculations The recoverable amounts of exploration and evaluation assets are determined using FVLCD, as there is no value in use (VIU). Costs to dispose are the incremental costs directly attributable to the disposal of an asset, excluding \ufb01nance costs and income tax expense. If the carrying amount of an AOI exceeds its recoverable amount, the AOI is written down to its recoverable amount and an impairment loss is recognised in the consolidated income statement. For assets previously impaired, if the recoverable amount exceeds the carrying amount, the impairment is reversed, but only to the extent that the asset\u2019s carrying amount does not exceed the carrying amount that would have been recognised if no impairment had occurred. Oil and gas properties Impairment testing The carrying amounts of oil and gas properties are assessed half-yearly to determine whether there is an indicator of impairment or impairment reversal for those assets which have previously been impaired. Indicators of impairment and impairment reversals include changes in reserves, expected future sales prices or costs. Oil and gas properties are assessed for impairment indicators and impairments on a cash-generating unit (CGU) basis. CGUs are determined as offshore and onshore facilities, infrastructure and associated oil and/or gas \ufb01elds. If there is an indicator of impairment or impairment reversal for a CGU, its recoverable amount is calculated and compared with the CGU\u2019s carrying value (refer to impairment calculations below). Goodwill For the purpose of impairment testing, goodwill acquired in a business combination is, from the acquisition date, allocated to each of the Group\u2019s cash-generating units (CGUs) that are expected to bene\ufb01t from the combination, irrespective of whether other assets or liabilities of the acquiree are assigned to those units. Goodwill is tested for impairment at least annually and more frequently if events or changes in circumstances indicate that it might be impaired. Impairment of goodwill is determined by assessing the recoverable amount of each CGU to which the goodwill relates and comparing it with its carrying value, which includes deferred taxes (refer to impairment calculations below and Note B.5). When part of an operation is disposed of, any goodwill associated with the disposed operation is included in the carrying amount of the operation in determining the gain or loss on disposal. Goodwill and oil and gas impairment calculations The recoverable amount of an asset or CGU is determined as the higher of its VIU and FVLCD. VIU is determined by estimating future cash \ufb02ows after taking into account the risks speci\ufb01c to the asset and discounting to present value using an appropriate discount rate. FVLCD is the price that would be received to sell the asset in an orderly transaction between market participants and does not re\ufb02ect the effects of factors that may be speci\ufb01c to the Group. In determining FVLCD, recent market transactions are considered. If no such transactions can be identi\ufb01ed, an appropriate valuation model, such as discounted cash \ufb02ow techniques, are applied on a post-tax basis using an appropriate discount rate and estimates are made about the assumptions market participants would use when pricing the asset or CGU. If the carrying amount of an asset or CGU, including any allocated goodwill, exceeds its recoverable amount, the asset or CGU is written down to its recoverable amount and an impairment loss is recognised in the consolidated income statement. Any impairment losses are \ufb01rst allocated to reduce the carrying amount of any goodwill allocated, with the remaining impairment losses allocated to the relevant assets. If the recoverable amount of an asset or CGU exceeds its carrying amount, and that asset has previously been impaired, the impairment is reversed. The carrying amount of the asset or CGU is increased to its recoverable amount, but only to the extent that the carrying amount does not exceed the value that would have been determined, net of depreciation or amortisation, if no impairment had been recognised. Impairments of goodwill are not reversed. Key estimates and judgements  CGU determination Identi\ufb01cation of a CGU requires management judgement. In  determining CGUs for acquired assets during the reporting period,  management has assessed based on the smallest group of assets that  generate signi\ufb01cant cash in\ufb02ows that are independent from other  assets or groups of assets. Allocation of goodwill Allocation of goodwill to the relevant CGUs requires management  judgement. The goodwill arising from the merger has been allocated  to relevant CGUs which are expected to bene\ufb01t from the expected  synergies as a result of the merger.  Recoverable amount calculation key assumptions  In determining the recoverable amount of CGUs, estimates are made  regarding the present value of future cash \ufb02ows when determining the  FVLCD. These estimates require signi\ufb01cant management judgement  and are subject to risk and uncertainty, and hence changes in economic  conditions can also affect the assumptions used and the rates used to  discount future cash \ufb02ow estimates. The basis for each estimate used to determine recoverable amounts as  at 31 December 2022 is set out below: \u2022  Resource estimates \u2013 2P and a portion of 2C reserves (where  applicable) for oil and gas properties. The reserves are as disclosed  in the Reserves and Resources Statement in the 31 December 2022  Annual Report. \u2022  In\ufb02ation rate \u2013 an in\ufb02ation rate of 2.0% has been applied for US  based assets and 2.5% for Australian based assets. \u2022  Foreign exchange rates \u2013 a rate of $0.75 US$:AU$ is based on  management\u2019s view of long-term exchange rates. Key estimates and judgements (cont.) Recoverable amount calculation key assumptions (cont.) \u2022  Discount rates \u2013 a range of post-tax discount rates between 8% and 11.5% for CGUs has been applied. The discount rate re\ufb02ects an assessment of the risks speci\ufb01c to the asset. \u2022  Carbon pricing \u2013 a long-term price of US$80/tonne of emissions (real terms 2022) is based on management\u2019s assumptions on carbon cost pricing and incorporates an evaluation of climate risk. This is applicable to Australian emissions that exceed facility- speci\ufb01c baselines in accordance with Australian regulations, as well as global emissions that exceed voluntary corporate net emissions targets. Woodside continues to monitor the uncertainty around climate change risks and will revise carbon pricing assumptions accordingly. Refer to Climate change and energy transition section within the basis of preparation for further information. \u2022  LNG price \u2013 the majority of LNG sales contracts are linked to an oil price marker; accordingly the LNG prices used are consistent with oil price assumptions. \u2022  Brent oil prices \u2013 derived from long-term views of global supply and demand, building upon past experience of the industry and consistent with external sources. Prices are adjusted for premiums and discounts based on the nature and quality of the product. Brent oil price estimates have considered the risk of climate policies along with other factors such as industry investment and cost trends. There is signi\ufb01cant uncertainty around how society will respond to the climate challenge; Woodside\u2019s pricing assumptions re\ufb02ect a \u2018best estimate\u2019 scenario in which global governments pursue decarbonisation as well as other goals such as energy security and economic development. As with carbon pricing, Woodside continues to monitor this uncertainty and will revise its oil pricing assumptions accordingly in its transition to a lower carbon economy. Further information on climate change risk is provided  in the Climate change and energy transition section within the basis of preparation. The nominal Brent oil prices (US$/bbl) used were: 2023 2024 2025 2026 2027 2028 31 December 20221 87 78 74 76 77 79 31 December 20212 71 68 69 70 72 73 1.   Long-term oil prices are based on US$70/bbl (2022 real terms) from 2025 and prices are escalated at 2.0% onwards. 2.  Long-term oil prices are based on US$65/bbl (2022 real terms) from 2024 and prices are escalated at 2.0% onwards. Key estimates and judgements CGU determination Identi\ufb01cation of a CGU requires management judgement. For the year ended 31 December 2021, management has determined that the Scarborough and Pluto Train 2 development concept integrates with the existing Pluto onshore assets and is the smallest group of assets that generate signi\ufb01cant cash in\ufb02ows that are independent from other assets or group of assets. Recoverable amount calculation key assumptions In determining the recoverable amount of CGUs, estimates are made regarding the present value of future cash \ufb02ows when determining the VIU. These estimates require signi\ufb01cant management judgement and are subject to risk and uncertainty, and hence changes in economic conditions can also affect the assumptions used and  the rates used to discount future cash \ufb02ow estimates. The basis for each estimate used to determine recoverable amounts as at 31 December 2021 is set out below: \u2022  Resource estimates \u2013 2P reserves for oil and gas properties, except for NWS Oil (Okha) which is based on 1P reserves due to the reclassi\ufb01cation to a late life asset. The reserves are as disclosed in the Reserves and resources statement in the 31 December 2021 Annual Report on pages 55-59. \u2022  In\ufb02ation rate \u2013 an in\ufb02ation rate of 2.0% has been applied. \u2022  Foreign exchange rates \u2013 a rate of $0.75 US$:AU$ is based on management\u2019s view of long-term exchange rates. \u2022  Discount rates \u2013 a range of pre-tax discount rates between 8.9% and 11.6% (post-tax discount rate 7.5%-8.5%) for CGUs has been applied. The discount rate re\ufb02ects an assessment of the risks speci\ufb01c to the asset. \u2022  An evaluation of climate risk is re\ufb02ected in Woodside's assumptions on carbon cost pricing, including a long-term Australian carbon price of US$80/tonne of emissions (real terms 2022). This is applicable to Australian emissions that exceed facility-speci\ufb01c baselines in accordance with Australian regulations, as well as global emissions that exceed voluntary corporate net emissions targets. Woodside continues to monitor the uncertainty around climate change risks and will revise carbon pricing assumptions accordingly. \u2022  LNG price \u2013 the majority of LNG sales contracts are linked to an oil price marker; accordingly the LNG prices used are consistent with oil price assumptions. \u2022  Brent oil prices \u2013 derived from long-term views of global supply and demand, building upon past experience of the industry and consistent with external sources. Prices are adjusted for premiums and discounts based on the nature and quality of the product. Brent oil price estimates have considered the risk of climate policies along with other factors such as industry investment and cost trends. There is signi\ufb01cant uncertainty around how society will respond to the climate challenge; Woodside\u2019s pricing assumptions re\ufb02ect a \u2018most-likely\u2019 scenario in which global governments pursue decarbonisation as well as other goals such as energy security and economic development. As with carbon pricing, Woodside continues to monitor this uncertainty and will revise its oil pricing assumptions accordingly in its transition to a lower carbon economy. Further information on climate change risk is provided  in Woodside\u2019s Climate Report 2021. The nominal Brent oil prices  (US$/bbl) used were: 2022 2023 2024 2025 2026 2027 31 December 20211 73 71 68 69 70 72 30 June 20202 57 62 67 72 73 75 1.  Based on US$65/bbl (2022 real terms) from 2024 with prices escalated at 2.0% annually thereafter. 2.  Based on US$65/bbl (2020 real terms) from 2025 with prices escalated at 2.0% annually thereafter. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForImpairmentOfAssetsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-768": {
   "value": "B.5  Business combination BHP Petroleum merger On 17 August 2021, Woodside and BHP Group (BHP) entered into a merger commitment deed to combine their respective oil and gas portfolios by an all-stock merger. The Share Sale Agreement (SSA) and the integration and transition services agreement were executed on 22 November 2021. Under the SSA, the merger took economic effect from 1 July 2021 and Woodside became entitled to the economic bene\ufb01ts and risks of the assets and liabilities that were the subject of the merger from that date. On 19 May 2022, 98.66% of Woodside shareholders voted in favour of the merger at Woodside\u2019s Annual General Meeting. On 1 June 2022, the transaction was completed with the Group acquiring 100% of the issued share capital of BHP Petroleum International Pty Ltd (subsequently renamed Woodside Energy Global Holdings Pty Ltd), which held BHP\u2019s oil and gas business. In exchange, the Group issued 914,768,948 new Woodside shares to BHP as part of the merger consideration. The transaction has been accounted for as a business combination with an acquisition date of 1 June 2022. The Group\u2019s net pro\ufb01t after tax for the year ended 31 December 2022 incorporates BHPP results from acquisition date. The merger is expected to create opportunities to realise ongoing synergies. Due to the size, complexity and timing of the transaction, the assets acquired and liabilities assumed are measured on a provisional basis. As at 31 December 2022, the Allocable Cost Amount (ACA) tax valuation process has been substantially completed with potential adjustments if new information is obtained within 12 months from the acquisition date about facts and circumstances that existed at the acquisition date. Adjustments will be made to the provisional amounts recognised including the value of goodwill. The merged Group\u2019s \ufb01nancial results could be adversely affected by impairments of goodwill or other intangible assets, the application of future accounting policies or interpretations of existing accounting policies including by regulatory direction, and changes in estimates of decommissioning costs. Details and risks have been included in the Merger Explanatory Memorandum released on 8 April 2022. Given the purchase consideration was agreed on 22 November 2021 based on a \ufb01xed number of shares, the \ufb01nal value of consideration paid was subject to \ufb02uctuations in share price until completion on 1 June 2022. This has resulted in a material goodwill number which will be subject to impairment in future, for example should commodity prices decrease. Details of the purchase consideration and the provisional fair value of goodwill, identi\ufb01able assets and liabilities of BHPP acquired are as follows: Provisional fair value of net identi\ufb01able assets and goodwill arising on acquisition date US$m Cash and cash equivalents  399 Receivables 1,164 Inventories 295 Investments accounted for using the equity method 267 Other \ufb01nancial assets 59 Other assets 114 Exploration and evaluation assets 180 Oil and gas properties 19,353 Lease assets 142 Payables (910) Provisions (4,804) Tax payable (365) Deferred tax liabilities (576) Lease liabilities (268) Other liabilities (1,054) Net identi\ufb01able assets acquired  13,996 Goodwill arising on acquisition  4,614 Purchase consideration 18,610 Purchase consideration US$m Shares issued, at fair value 19,265 Other reserves (share replacement awards) 18 Provisional locked box payment received1 (683) Adjustments to locked box payment 10 Total purchase consideration 18,610 1.  Represents the positive net cash \ufb02ow of $1,513 million generated by BHPP assets from the effective date of the business combination offset by the notional dividend distribution of $830 million paid to BHP. Analysis of cash \ufb02ows on acquisition US$m Cash acquired on acquisition  399 Provisional locked box payment received 683 Net cash \ufb02ow on acquisition (included in the consolidated statement of cash \ufb02ows as investing activities) 1,082 Acquisition-related costs of $419 million that were not directly attributable to the issue of shares are included as an expense in general, administration and other costs in the consolidated income statement. $357 million has been paid and included in the consolidated statement of cash \ufb02ows as operating activities. Acquisition-related costs of $5 million directly attributable to the issue of shares are included in contributed equity and included in the consolidated statement of cash \ufb02ows as \ufb01nancing activities. Shares issued, at fair value The fair value of 914,768,948 shares issued as part of the consideration paid to BHP was $19,265 million. This was based on the published share price on 1 June 2022 of US$21.06 per share. B.5    Business comination (cont.) Provisional locked box payment received The Group received $683 million as part of the merger consideration which includes the locked box payment of $1,513 million representing the positive net cash \ufb02ow generated by BHPP assets from the effective date of the transaction to completion date offset by the notional dividend distribution of $830 million paid to BHP. The $683 million of provisional locked box payment received and the $399 million of cash and cash equivalents acquired as part of the merger have been included within investing activities in the consolidated statement of cash \ufb02ows. Revenue and contribution to the Group The acquired business contributed operating revenue of $4,653 million and pro\ufb01t before tax of $2,042 million to the Group from the acquisition date to 31 December 2022. If the acquisition had occurred on 1 January 2022, consolidated operating revenue and pro\ufb01t before tax would have been higher by $3,115 million and $1,265 million respectively. Acquired receivables The fair value of receivables approximates the gross amount of trade receivables. None of the receivables have been impaired and the full contractual amounts are expected to be collected. Other liabilities The Group recognised contingent liabilities of $79 million within other liabilities. This is based on the Group\u2019s assessment of the fair value of contingent liabilities acquired on acquisition, taking into account a range of possible outcomes. As at 31 December 2022, there have been no changes to the amount recognised on acquisition date. Goodwill Goodwill arising from the acquisition has been recognised as the excess of consideration paid above the fair value of the assets acquired and liabilities assumed as part of the business combination. $1,958 million of the goodwill arises from the deferred tax liability recognised on acquisition as a consequence of asset tax bases received in the merger being lower than the fair value of the assets acquired. The remaining goodwill of $2,656 million re\ufb02ects the value expected to be generated from the Pluto-Scarborough CGU as a result of the merger. The goodwill is not deductible for tax purposes. Goodwill is initially measured at cost and is subsequently measured at cost less any accumulated impairment losses. For the purposes of impairment testing, goodwill acquired in a business combination is, from the acquisition date, allocated to each of the Group\u2019s CGUs or groups of CGUs no larger than an operating segment that are expected to bene\ufb01t from the combination, irrespective of whether other assets or liabilities of the acquiree are assigned to those units. Where goodwill has been allocated to a CGU and part of the operation within that unit is disposed of, the goodwill associated with the disposed operation is included in the carrying amount of the operation when determining the gain or loss on disposal. Goodwill is not amortised but will be assessed at least annually for impairment and more frequently if events or changes in circumstances indicate that it might be impaired. Share replacement awards In accordance with the terms of the SSA, the Group exchanged equity-settled share-based payment awards held by employees of BHPP for equity-settled share-based payment awards of Woodside. The replacement awards are based on service conditions with a vesting date of 31 August 2023 and 31 August 2024. The fair value of the replacement awards on acquisition is $49 million based on a forfeiture rate of 3%. $18 million has been included as part of the purchase consideration and the remaining amount will be recognised as post-acquisition compensation cost. Business combination accounting The acquisition method of accounting is used to account for all business combinations, including business combinations involving entities or businesses under common control, regardless of whether equity instruments are issued or liabilities incurred or assumed at the date of exchange. Where equity instruments are issued in an acquisition, the fair value of the instruments is their published market price as at the date of exchange. Transaction costs arising on the issue of equity instruments are recognised directly in equity. Transaction costs that were not directly attributable to the issue of shares are expensed as incurred. Contractual assets and liabilities in respect of sales agreements are recognised at fair value. Restoration provisions are recognised on acquisition at fair value. Key estimates and judgements (a) Fair value determination for net assets acquired Judgement is required to determine the fair value of assets acquired and liabilities assumed in a business combination, which can have a material impact on resultant goodwill. This includes the use of a cash \ufb02ow model to estimate the expected future cash \ufb02ows of the oil and gas assets acquired, based on reserves and resources at acquisition date and the discount rate used. The expected future cash \ufb02ows are based on estimates of future production, commodity and carbon prices, operating costs, and forecast capital expenditures at acquisition date. Restoration provisions require judgemental assumptions regarding removal date, environmental legislation and regulations and the extent of restoration activities required in determining the cost estimate. Carry forward tax losses are recognised only if it is probable that sufficient future taxable income will be available to utilise the losses. (b) Goodwill allocation Judgement is required in the allocation of goodwill to the Group\u2019s CGUs that are expected to bene\ufb01t from the synergies of the business combination. Refer to Note B.4 for the details of the goodwill allocation. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBusinessCombinationsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-799": {
   "value": "Business combination accounting The acquisition method of accounting is used to account for all business combinations, including business combinations involving entities or businesses under common control, regardless of whether equity instruments are issued or liabilities incurred or assumed at the date of exchange. Where equity instruments are issued in an acquisition, the fair value of the instruments is their published market price as at the date of exchange. Transaction costs arising on the issue of equity instruments are recognised directly in equity. Transaction costs that were not directly attributable to the issue of shares are expensed as incurred. Contractual assets and liabilities in respect of sales agreements are recognised at fair value. Restoration provisions are recognised on acquisition at fair value. Key estimates and judgements (a) Fair value determination for net assets acquired Judgement is required to determine the fair value of assets acquired and liabilities assumed in a business combination, which can have a material impact on resultant goodwill. This includes the use of a cash \ufb02ow model to estimate the expected future cash \ufb02ows of the oil and gas assets acquired, based on reserves and resources at acquisition date and the discount rate used. The expected future cash \ufb02ows are based on estimates of future production, commodity and carbon prices, operating costs, and forecast capital expenditures at acquisition date. Restoration provisions require judgemental assumptions regarding removal date, environmental legislation and regulations and the extent of restoration activities required in determining the cost estimate. Carry forward tax losses are recognised only if it is probable that sufficient future taxable income will be available to utilise the losses. (b) Goodwill allocation Judgement is required in the allocation of goodwill to the Group\u2019s CGUs that are expected to bene\ufb01t from the synergies of the business combination. Refer to Note B.4 for the details of the goodwill allocation. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForBusinessCombinationsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-769": {
   "value": "B.6  Signi\ufb01cant production and growth asset acquisitions (a) Sangomar \u2013 Acquisition from FAR Senegal RSSD SA On 7 July 2021, Woodside completed the acquisition of FAR Senegal RSSD SA\u2019s interest in the RSSD Joint Venture (13.67% interest in the Sangomar exploitation area and 15% interest in the remaining RSSD evaluation area), for an aggregate purchase price of $212 million. The transaction was accounted for as an asset acquisition. Additional payments of up to $55 million are contingent on future commodity prices and timing of \ufb01rst oil. The contingent payments terminate on the earliest of 31 December 2027, three years from \ufb01rst oil being sold, and a total contingent payment of $55 million being reached. The contingent payments are accounted for as contingent liabilities in accordance with the Group\u2019s accounting policies. As at 31 December 2021, Woodside held an 82% interest in the Sangomar exploitation area (2020: 68.33%) and a 90% interest in the remaining RSSD evaluation area (2020: 75%). Assets acquired and liabilities assumed The identi\ufb01able assets and liabilities acquired as at the date of the acquisition inclusive of transaction costs are: US$m Oil and gas properties 205 Exploration and evaluation 7 Cash acquired 3 Payables (13) Net other assets and liabilities assumed 10 Total identi\ufb01able net assets at acquisition 212 Cash \ufb02ows on acquisition US$m Purchase cash consideration 212 Transaction costs - Total purchase consideration 212 Net cash out\ufb02ows on acquisition 212 Key estimates and judgements Nature of acquisition Judgement was required to determine if the transaction was the acquisition of an asset or a business combination. The Sangomar project was in the early phase of development and a substantive process that had the ability to convert inputs to outputs was not present and therefore the acquisition in 2021 was treated as asset acquisitions. (b) Sangomar \u2013 Acquisition from Capricorn Senegal Limited On 22 December 2020, Woodside completed the acquisition of Capricorn Senegal Limited\u2019s (Cairn\u2019s) interest in the RSSD Joint Venture (36.44% interest in the Sangomar exploitation area and 40% interest in the remaining RSSD evaluation area) for an aggregate purchase price of $527 million. The transaction was accounted for as an asset acquisition. Additional payments of up to $100 million are contingent on future commodity prices and the occurrence of \ufb01rst oil prior to 2025. The contingent payments are accounted for as contingent liabilities in accordance with the Group\u2019s accounting policies. Assets acquired and liabilities assumed The identi\ufb01able assets and liabilities acquired as at the date of the acquisition inclusive of transaction costs were: US$m Oil and gas properties 540 Exploration and evaluation 26 Cash acquired 5 Payables (51) Net other assets and liabilities assumed 7 Total identi\ufb01able net assets at acquisition 527 Cash \ufb02ows on acquisition US$m Purchase cash consideration 525 Transaction costs 2 Total purchase consideration 527 Net cash out\ufb02ows on acquisition 527",
   "dimensions": {
    "concept": "woodsideenergygroupltd:DisclosureOfSignificantProductionAndGrowthAssetAcquisitions",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-770": {
   "value": "B.7  Disposal of assets Sell-down of Train 2 On 15 November 2021 the Group entered into a sale and purchase agreement with Global Infrastructure Partners (GIP) for the sale of a 49% non-operating participating interest in the Pluto Train 2 Joint Venture. As at 31 December 2021, the Group reclassi\ufb01ed the carrying value of the 49% interest in the Pluto Train 2 assets to assets held for sale. There were no recognised liabilities associated with the assets held for sale. The transaction completed on 18 January 2022, reducing the Group\u2019s participating interest from 100% to 51%. The Group recognised an initial pre-tax gain on sale of $427 million. The arrangements require GIP to fund its 49% share of capital expenditure from 1 October 2021 and an additional amount of construction capital expenditure of $822 million on behalf of the Group. If the total capital expenditure incurred is less than $5,800 million, GIP will pay Woodside an additional amount equal to 49% of the under-spend. In the event of a cost overrun, Woodside will fund up to $822 million of GIP\u2019s share of the overrun. Delays to the expected start-up of production will result in payments by Woodside to GIP in certain circumstances. The arrangements include provisions for GIP to be compensated for exposure to additional Scope 1 emissions liabilities above agreed baselines, and to sell its 49% interest back to Woodside if the status of key regulatory approvals materially changes. Given judgement was used to determine the consideration received, the Group is required to remeasure the variable consideration at each reporting period. As at 31 December 2022, the variable consideration has been remeasured with a $71 million revaluation gain recognised as other income, with a corresponding reduction to other liabilities. The fair value of the remaining unpaid funding from GIP has been netted against the other liabilities and will be recognised as oil and gas properties in the future. Key estimates and judgements Sell-down of Train 2 Given the arrangements include provisions for GIP to sell its 49% interest back to Woodside if the status of key regulatory environmental approvals materially changes and the requirement for Woodside to fund up to $822 million of GIP\u2019s share in the event of a cost overrun, judgement is required to determine if the sell- down of Train 2 constitutes a sale and if a portion of the transaction price should be considered a variable consideration. Judgement was used to determine that the sell-down of  Train 2 constituted a sale given the various conditions included in the sale and purchase agreement. The Group determined that a sale occurred as control of the 49% interest was passed to GIP on completion date. Control is determined as the ability to direct the use of, and obtain substantially all of the economic bene\ufb01ts of, the associated interest. Judgement was used to determine if it is highly probable that a signi\ufb01cant reversal will not occur in relation to the consideration received. The Group estimated the variable consideration based on the construction capital expenditure cost pro\ufb01le, the development schedule, and assessing the probability and impact of any event which may result in a signi\ufb01cant reversal. The constraining estimates of variable consideration have been applied resulting  in the initial pre-tax gain on sale of $427 million. The variable consideration is remeasured at each reporting period with any changes recognised through the consolidated income statement. As at 31 December 2022, the variable consideration has been remeasured with a $71 million revaluation gain recognised as other income. ",
   "dimensions": {
    "concept": "woodsideenergygroupltd:DisclosureOfDisposalOfAssets",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-800": {
   "value": "Capital risk management Group Treasury is responsible for the Group's capital management including cash, debt and equity. Capital management is undertaken  to ensure that a secure, cost-effective and \ufb02exible supply of funds is available to meet the Group\u2019s operating and capital expenditure  requirements. A stable capital base is maintained from which the Group can pursue its growth aspirations, whilst maintaining a \ufb02exible  capital structure that allows access to a range of debt and equity markets to both draw upon and repay capital. The Dividend Reinvestment Plan (DRP) was approved by shareholders at the Annual General Meeting in 2003 for activation  as required to fund future growth. The DRP was reactivated in 2019 and suspended by the Board of Directors on 27 February 2023.  A range of \ufb01nancial metrics are monitored, including gearing and cash \ufb02ow leverage, and Treasury policy breaches and exceptions. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfObjectivesPoliciesAndProcessesForManagingCapitalExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-801": {
   "value": "Liquidity risk management Liquidity risk arises from the \ufb01nancial liabilities of the Group and the Group\u2019s subsequent ability to meet its obligations to repay  \ufb01nancial liabilities as and when they fall due. The liquidity position of the Group is managed to ensure sufficient liquid funds are  available to meet its \ufb01nancial commitments in a timely and cost-effective manner. The Group\u2019s liquidity is continually reviewed, including cash \ufb02ow forecasts to determine the forecast liquidity position and maintain  appropriate liquidity levels. At 31 December 2022, the Group had a total of $10,239 million (2021: $6,125 million) of available undrawn  facilities and cash at its disposal. The maturity pro\ufb01le of interest-bearing liabilities is disclosed in Note C.2, trade and other payables  are disclosed in Note D.4 and lease liabilities are disclosed in Note D.7. Financing facilities available to the Group are disclosed in  Note C.2. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfLiquidityRiskExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-802": {
   "value": "Interest rate risk management Interest rate risk is the risk that the Group\u2019s \ufb01nancial position will \ufb02uctuate due to changes in market interest rates. The Group\u2019s exposure to the risk of changes in market interest rates relates primarily to \ufb01nancial instruments with \ufb02oating interest  rates including long-term debt obligations, cash and short-term deposits. The Group manages its interest rate risk by maintaining an  appropriate mix of \ufb01xed and \ufb02oating rate debt. To manage the ratio of \ufb01xed rate debt to \ufb02oating rate debt, the Group may enter into  interest rate swaps. The Group holds cross-currency interest rate swaps to hedge the foreign exchange risk (refer to Section A) and  interest rate risk of the CHF denominated medium term note. The Group also holds interest rate swaps to hedge the interest rate risk  associated with the $600 million syndicated facility. Refer to Notes C.2 and D.6 for further details. At the reporting date, the Group was exposed to various benchmark interest rates that were not designated in cash \ufb02ow hedges,  primarily through $6,143 million (2021: $2,962 million) on cash and cash equivalents, $83 million (2021: $367 million) on interest- bearing liabilities (excluding transaction costs), $167 million of other \ufb01nancial assets (2021: nil) and $5 million (2021: $9 million) on  cross-currency interest rate swaps. A reasonably possible change in the USD London Interbank Offered Rate (USD LIBOR) (+1.5%/-1.5% (2021: +1.0%/-1.0%)), with all  variables held constant, would not have a material impact on the Group\u2019s equity or the income statement in the current period. The transition of a number of the Group\u2019s \ufb01nancial liabilities from USD LIBOR to SOFR during the year ended 31 December 2022  did not result in a material impact to the Group. The Group\u2019s Treasury function continues to execute the transition of the remaining  \ufb01nancial instruments from current benchmark rates to alternative benchmark rates.  ",
   "dimensions": {
    "concept": "woodsideenergygroupltd:DisclosureOfInterestRateRiskManagement",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-771": {
   "value": "C.1  Cash and cash equivalents 2022 2021 US$m US$m Cash and cash equivalents Cash at bank  1,222   300 Term deposits  4,967   2,725 Restricted cash  12   - Total cash and cash equivalents  6,201   3,025 Recognition and measurement Cash and cash equivalents in the consolidated statement of \ufb01nancial position comprise cash at bank and short-term deposits with an original maturity of three months or less. Cash and cash equivalents are stated at face value in the consolidated statement of \ufb01nancial position. Cash and cash equivalents include $12 million (2021: nil) restricted by legal or contractual arrangements. Foreign exchange risk The following table summarises the Group's cash and cash equivalents by currency. 2022 2021 US$m US$m US dollar  5,886   2,917 Australian dollar  182   63 Other  133   45 Total cash and cash equivalents  6,201   3,025",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCashAndCashEquivalentsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-803": {
   "value": "Recognition and measurement  Cash and cash equivalents in the consolidated statement of  \ufb01nancial position comprise cash at bank and short-term deposits  with an original maturity of three months or less. Cash and  cash equivalents are stated at face value in the consolidated  statement of \ufb01nancial position. Cash and cash equivalents  include $12 million (2021: nil) restricted by legal or contractual  arrangements.  ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyToDetermineComponentsOfCashAndCashEquivalents",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-772": {
   "value": "C.2  Interest-bearing liabilities and \ufb01nancing facilities Bilateral Facilities Syndicated Facilities JBIC Facility US Bonds Medium Term Notes Total US$m US$m US$m US$m US$m US$m Year ended 31 December 2022 At 1 January 2022 (4) 595  166  4,081  592  5,430 Repayments1 - - (83) - (200) (283) Fair value adjustment and foreign exchange movement - - - - (7) (7 Transaction costs capitalised and amortised (1) (4) - 3  - (2 Carrying amount at 31 December 2022 (5) 591  83  4,084  385  5,138 Current (2) (3) 83  (3) 185  260 Non-current (3) 594  - 4,087  200  4,878 Carrying amount at 31 December 2022 (5) 591  83  4,084  385  5,138 Undrawn balance at 31 December 2022 2,050  2,000  - - - 4,050 Year ended 31 December 2021 At 1 January 2021 (4) 593  250  4,778  597  6,214 Repayments1 - - (84) (700) - (784 Fair value adjustment and foreign exchange movement - - - - (5) (5 Capitalised borrowing costs - 2  - 3  - 5 Carrying amount at 31 December 2021 (4) 595  166  4,081  592  5,430 Current (2) (2) 83  (2) 200  277 Non-current (2) 597  83  4,083  392  5,153 Carrying amount at 31 December 2021 (4) 595  166  4,081  592  5,430 Undrawn balance at 31 December 2021 1,900  1,200  - - - 3,100 1.  Included in cash \ufb02ows classi\ufb01ed within \ufb01nancing activities in the consolidated statement of cash \ufb02ows. Recognition and measurement All borrowings are initially recognised at fair value less transaction costs. Borrowings are subsequently carried at amortised cost. Any difference between the proceeds received and the redemption amount is recognised in the income statement over the period of the borrowings using the effective interest method. Borrowings designated as a hedged item are measured at amortised cost adjusted to record changes in the fair value of risks that are being hedged in fair value hedges. The changes in the fair value risks of the hedged item resulted in a gain of $7 million being recorded (2021: gain of $5 million), and a loss of $7 million recorded on the hedging instrument (2021: loss of $7 million). All bonds, notes and facilities are subject to various covenants and negative pledges restricting future secured borrowings, subject to a number of permitted lien exceptions. Neither the covenants nor the negative pledges have been breached at any time during the reporting period. C.2   Interest-bearing liabilities and \ufb01nancing facilities (cont.) Fair value The carrying amount of interest-bearing liabilities approximates their fair value, with the exception of the Group\u2019s unsecured bonds and the medium term notes. The unsecured bonds have a carrying amount of $4,084 million (2021: $4,081 million) and a fair value of $3,852 million (2021: $4,443 million). The medium term notes have a carrying amount of $385 million (2021: $592 million) and a fair value of $372 million (2021: $604 million). Fair value is calculated based on the present value of future principal and interest cash \ufb02ows, discounted at the market rate of interest at the reporting date and classi\ufb01ed as Level 1 on the fair value hierarchy. Where these cash \ufb02ows are in a foreign currency, the present value is converted to US dollars at the foreign exchange spot rate prevailing at the reporting date. The Group\u2019s repayment obligations remain unchanged. Foreign exchange risk All interest-bearing liabilities are denominated in US dollars, excluding the CHF175 million medium term note. Maturity pro\ufb01le of interest-bearing liabilities The table below presents the contractual undiscounted cash \ufb02ows associated with the Group\u2019s interest-bearing liabilities, representing principal and interest. The \ufb01gures will not necessarily reconcile with the amounts disclosed in the consolidated statement of \ufb01nancial position. 2022 2021 US$m US$m Due for payment in: 1 year or less 483  470 1-2 years 206  462 2-3 years 1,181  188 3-4 years 962  1,169 4-5 years 908  951 More than 5 years 2,416  3,320 6,156  6,560 Amounts exclude transaction costs. Bilateral facilities The Group has 14 bilateral loan facilities totalling $2,050 million (2021: 14 bilateral loan facilities totalling $1,900 million). Details of bilateral loan facilities at the reporting date are as follows: Number of facilities Term (years) Currency Extension option 1 5 - 6 US$ Evergreen 5 4 - 5 US$ Evergreen 4 3 - 4 US$ Evergreen 4 3 years or less US$ Evergreen Interest rates are based on USD LIBOR or Secured Overnight Financing Rate (SOFR) and margins are \ufb01xed at the commencement of the drawdown period. Interest is paid at the end of the drawdown period. Evergreen facilities may be extended continually by a year subject to the bank\u2019s agreement. Syndicated facility During the period, Woodside re\ufb01nanced and increased the existing facilities to $2,000 million, with $800 million expiring on 11 October 2024, $600 million expiring on 12 July 2025 and $600 million expiring on 12 July 2027. Interest rates are based on SOFR and margins are \ufb01xed at the commencement of the drawdown period. On 17 January 2020, the Group completed a $600 million syndicated facility with a term of seven years. Interest is based on the USD LIBOR plus 1.2%. Interest is paid on a quarterly basis. Japan Bank for International Cooperation (JBIC) facility On 24 June 2008, the Group entered into a two tranche committed loan facility of $1,000 million and $500 million respectively. The $500 million tranche was repaid in 2013. There is a prepayment option for the remaining balance. Interest rates are based on USD LIBOR. Interest is payable semi-annually in arrears and the principal amortises on a straight-line basis, with equal instalments of principal due on each interest payment date (every six months). Under this facility, 90% of the receivables from designated Pluto LNG sale and purchase agreements are secured in favour of the lenders through a trust structure, with a required reserve amount of $30 million. To the extent that this reserve amount remains fully funded and no default notice or acceleration notice has been given, the revenue from Pluto LNG continues to \ufb02ow directly to the Group from the trust account. Medium term notes On 28 August 2015, the Group established a $3,000 million Global Medium Term Notes Programme listed on the Singapore Stock Exchange. Two notes have been issued under this programme as set out below: Maturity date Currency Carrying amount (million) Nominal interest rate 11 December 2023 CHF 185 1.00% 29 January 2027 US$ 200 3.07% The unutilised program is not considered to be an unused facility. US bonds The Group has four unsecured bonds issued in the United States of America as de\ufb01ned in Rule 144A of the US Securities Act of 1933 as set out below: Maturity date Carrying amount US$m Nominal interest rate 5 March 2025  1,000  3.65% 15 September 2026  800  3.70% 15 March 2028  800  3.70% 4 March 2029  1,500  4.50% Interest on the bonds is payable semi-annually in arrears. During the period, the Group repaid $200 million of the Yucho 2022 Medium Term Note and $83 million on the JBIC facility.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfBorrowingsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-804": {
   "value": "Recognition and measurement All borrowings are initially recognised at fair value less  transaction costs. Borrowings are subsequently carried at  amortised cost. Any difference between the proceeds received  and the redemption amount is recognised in the income  statement over the period of the borrowings using the effective  interest method. Borrowings designated as a hedged item are measured at  amortised cost adjusted to record changes in the fair value of  risks that are being hedged in fair value hedges. The changes in  the fair value risks of the hedged item resulted in a gain of  $7 million being recorded (2021: gain of $5 million), and a loss  of $7 million recorded on the hedging instrument (2021: loss of  $7 million). All bonds, notes and facilities are subject to various covenants  and negative pledges restricting future secured borrowings,  subject to a number of permitted lien exceptions. Neither the  covenants nor the negative pledges have been breached at any  time during the reporting period. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForBorrowingsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-805": {
   "value": "C.3  Contributed equity Recognition and measurement Issued capital Ordinary shares are classi\ufb01ed as equity and recorded at the value of consideration received. The cost of issuing shares is shown in share capital as a deduction, net of tax, from the proceeds. Reserved shares Reserved shares are the Group\u2019s own equity instruments, which are reacquired for later use in employee share-based payment arrangements or the Dividend Reinvestment Plan (DRP). These shares are deducted from equity. No gain or loss is recognised in the income statement on the purchase, sale, issue or cancellation of the Group\u2019s own equity instruments. (a) Issued and fully paid shares Number of shares US$m Year ended 31 December 2022 Opening balance  969,631,826   9,409 DRP \u2013 ordinary shares issued at US$23.14 (2021 \ufb01nal dividend)1  14,348,997   332 Ordinary shares issued at US$21.06 for the acquisition of BHPP2  914,768,948   19,265 Transaction costs associated to the issue of shares  -   (5) Amounts as at 31 December 2022  1,898,749,771   29,001 Year ended 31 December 2021 Opening balance  962,225,814   9,297 DRP \u2013 ordinary shares issued at US$19.03 (2020 \ufb01nal dividend)   1,354,072   26 DRP \u2013 ordinary shares issued at US$14.21 (2021 interim dividend)   6,051,940   86 Amounts as at 31 December 2021 969,631,826  9,409 Year ended 31 December 2020 Opening balance  942,286,900   9,010 DRP \u2013 ordinary shares issued at A$25.61 (2019 \ufb01nal dividend)  12,072,034   181 DRP \u2013 ordinary shares issued at A$18.79 (2020 interim dividend)  6,091,035   83 Employee share plan \u2013 ordinary shares issued at A$18.27  (2017 Woodside equity plan)  1,775,845   23 Amounts as at 31 December 2020  962,225,814   9,297 1.  Relates to ordinary shares issued for the DRP as part of the 2021 \ufb01nal dividend. The Group purchased on-market shares for the issuance of DRP as part of the 2022 interim dividend. Refer to Note C.3(b) for details of the on-market purchases and allocation.  2.  914,768,948 new Woodside shares were issued as consideration for the BHPP merger. Refer to Note B.5 for details. All shares are a single class with equal rights to dividends, capital, distributions and voting. The Company does not have authorised capital nor par value in relation to its issued shares. (b) Reserved shares Employee share plans Dividend reinvestment plan Number of shares US$m Number of shares US$m Year ended 31 December 2022 Opening balance 1,819,744  (30) - - Purchases during the year 2,232,589  (45) 6,823,092  (144) Vested/allocated during the year (2,178,556) 37  (6,823,092) 144 Amounts at 31 December 2022 1,873,777  (38) - - Year ended 31 December 2021 Opening balance 1,766,099  (23) - - Purchases during the year 2,683,469  (47) - - Vested during the year (2,629,824) 40  - - Amounts at 31 December 2021 1,819,744  (30) - - Year ended 31 December 2020 Opening balance 1,985,306  (39) - - Purchases during the year 2,242,345  (32) - - Vested during the year (2,461,552) 48  - - Amounts at 31 December 2020 1,766,099  (23) ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTreasurySharesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-773": {
   "value": "C.3  Contributed equity Recognition and measurement Issued capital Ordinary shares are classi\ufb01ed as equity and recorded at the value of consideration received. The cost of issuing shares is shown in share capital as a deduction, net of tax, from the proceeds. Reserved shares Reserved shares are the Group\u2019s own equity instruments, which are reacquired for later use in employee share-based payment arrangements or the Dividend Reinvestment Plan (DRP). These shares are deducted from equity. No gain or loss is recognised in the income statement on the purchase, sale, issue or cancellation of the Group\u2019s own equity instruments. (a) Issued and fully paid shares Number of shares US$m Year ended 31 December 2022 Opening balance  969,631,826   9,409 DRP \u2013 ordinary shares issued at US$23.14 (2021 \ufb01nal dividend)1  14,348,997   332 Ordinary shares issued at US$21.06 for the acquisition of BHPP2  914,768,948   19,265 Transaction costs associated to the issue of shares  -   (5) Amounts as at 31 December 2022  1,898,749,771   29,001 Year ended 31 December 2021 Opening balance  962,225,814   9,297 DRP \u2013 ordinary shares issued at US$19.03 (2020 \ufb01nal dividend)   1,354,072   26 DRP \u2013 ordinary shares issued at US$14.21 (2021 interim dividend)   6,051,940   86 Amounts as at 31 December 2021 969,631,826  9,409 Year ended 31 December 2020 Opening balance  942,286,900   9,010 DRP \u2013 ordinary shares issued at A$25.61 (2019 \ufb01nal dividend)  12,072,034   181 DRP \u2013 ordinary shares issued at A$18.79 (2020 interim dividend)  6,091,035   83 Employee share plan \u2013 ordinary shares issued at A$18.27  (2017 Woodside equity plan)  1,775,845   23 Amounts as at 31 December 2020  962,225,814   9,297 1.  Relates to ordinary shares issued for the DRP as part of the 2021 \ufb01nal dividend. The Group purchased on-market shares for the issuance of DRP as part of the 2022 interim dividend. Refer to Note C.3(b) for details of the on-market purchases and allocation.  2.  914,768,948 new Woodside shares were issued as consideration for the BHPP merger. Refer to Note B.5 for details. All shares are a single class with equal rights to dividends, capital, distributions and voting. The Company does not have authorised capital nor par value in relation to its issued shares. (b) Reserved shares Employee share plans Dividend reinvestment plan Number of shares US$m Number of shares US$m Year ended 31 December 2022 Opening balance 1,819,744  (30) - - Purchases during the year 2,232,589  (45) 6,823,092  (144) Vested/allocated during the year (2,178,556) 37  (6,823,092) 144 Amounts at 31 December 2022 1,873,777  (38) - - Year ended 31 December 2021 Opening balance 1,766,099  (23) - - Purchases during the year 2,683,469  (47) - - Vested during the year (2,629,824) 40  - - Amounts at 31 December 2021 1,819,744  (30) - - Year ended 31 December 2020 Opening balance 1,985,306  (39) - - Purchases during the year 2,242,345  (32) - - Vested during the year (2,461,552) 48  - - Amounts at 31 December 2020 1,766,099  (23) ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfIssuedCapitalExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-824": {
   "value": "Issued capital Ordinary shares are classi\ufb01ed as equity and recorded at the value of consideration received. The cost of issuing shares is shown in share capital as a deduction, net of tax, from the proceeds. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForIssuedCapitalExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-823": {
   "value": "Reserved shares Reserved shares are the Group\u2019s own equity instruments, which are reacquired for later use in employee share-based payment arrangements or the Dividend Reinvestment Plan (DRP). These shares are deducted from equity. No gain or loss is recognised in the income statement on the purchase, sale, issue or cancellation of the Group\u2019s own equity instruments. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForTreasurySharesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-774": {
   "value": "C.4  Other reserves 2022 2021 2020 US$m US$m US$m Other reserves Employee bene\ufb01ts reserve 278  232  219 Foreign currency translation reserve 796  793  793 Hedging reserve1 (586) (400) (71) Distributable pro\ufb01ts reserve2 3,541  58  462 Other reserves 2  - - 4,031  683  1,403 1.  The portion of the hedging reserve relating to settled hedges is $226 million. 2.  For the year ended 31 December 2022, the Group transferred $5,553 million of retained earnings to the distributable pro\ufb01ts reserve. The increase was offset by the 2022 interim dividend of $2,070 million which was paid on 6 October 2022. Nature and purpose Employee bene\ufb01ts reserve Used to record share-based payments associated with the employee share plans. Foreign currency translation reserve Used to record foreign exchange differences arising from the translation of the \ufb01nancial statements of foreign entities from their functional currency to the Group\u2019s presentation currency. Hedging reserve Used to record gains and losses on hedges designated as cash \ufb02ow hedges, and foreign currency basis spread arising from the designation of a \ufb01nancial instrument as a hedging instrument. Gains and losses accumulated in the cash \ufb02ow hedge reserve for qualifying assets are capitalised against the carrying amount of that asset and taken to the income statement as the asset is depreciated. Distributable pro\ufb01ts reserve Used to record distributable pro\ufb01ts generated by the Parent entity, Woodside Energy Group Ltd. Other reserves Used to record gains and losses on \ufb01nancial instruments at fair value through other comprehensive income. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfReservesAndOtherEquityInterestExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-806": {
   "value": "Credit risk management Credit risk is the risk that a counterparty will not meet its obligation under a \ufb01nancial instrument or customer contract, leading to a \ufb01nancial loss to the Group. Credit risk arises from the \ufb01nancial assets of the Group, which comprise trade and other receivables, loans receivables and deposits with banks and \ufb01nancial institutions. The Group manages its credit risk on trade receivables and \ufb01nancial instruments by predominantly dealing with counterparties with an investment grade credit rating. Sufficient collateral is obtained to mitigate the risk of \ufb01nancial loss when transacting with counterparties with below investment grade credit ratings. Customers who wish to trade on unsecured credit terms are subject to credit veri\ufb01cation procedures. Receivable balances are monitored on an ongoing basis. As a result, the Group\u2019s exposure to bad debts is not signi\ufb01cant. The Group\u2019s maximum credit risk is limited to the carrying amount of its \ufb01nancial assets. Customer credit risk is managed by the Treasury function subject to the Group\u2019s established policy, procedures and controls relating to customer credit risk management. Credit quality of a customer is assessed based on an extensive credit rating scorecard and individual credit limits are de\ufb01ned in accordance with this assessment. Outstanding customer receivables are regularly monitored. At 31 December 2022, the Group had nineteen customers (2021: four customers) that owed the Group more than $10 million each and accounted for approximately 79% (2021: 88%) of all trade receivables. Depending on the product, settlement terms are 8 to 30 days from the date of invoice or bill of lading unless otherwise stated in the agreed payment terms. The Group considers the probability of default upon initial recognition of the asset and whether there has been a signi\ufb01cant depreciation in credit quality on an ongoing basis. A signi\ufb01cant decrease in credit quality is de\ufb01ned as a debtor being greater than 30 days past due in making a contractual payment. Credit losses for trade receivables (including lease receivables) and contract assets are determined by applying the simpli\ufb01ed approach and are measured at an amount equal to lifetime expected loss. Under the simpli\ufb01ed approach, determination of the loss allowance provision and expected loss rate incorporates past experience and forward- looking information, including the outlook for market demand and forward-looking interest rates. A default on other \ufb01nancial assets is considered to be when the counterparty fails to make contractual payments within 60 days of when they fall due. At 31 December 2022, the Group had a provision for credit losses of nil (2021: nil). Subsequent to 31 December 2022, 99% (2021: 100%) of the trade receivables balance of $1,067 million (2021: $152 million) has been received. Credit risk from balances with banks is managed by the Treasury function in accordance with the Group\u2019s policy. The Group\u2019s main funds are placed as short-term deposits with reputable \ufb01nancial institutions with strong investment grade credit ratings. At 31 December 2022 and 31 December 2021, there were no signi\ufb01cant concentrations of credit risk within the Group and \ufb01nancial instruments are spread amongst a number of \ufb01nancial institutions to minimise the risk of counterparty default. The maximum exposure to \ufb01nancial institution credit risk is represented by the sum of all cash deposits plus accrued interest, bank account balances and fair value of derivative assets. The Group\u2019s counterparty credit policy limits this exposure to commercial and investment banks, according to approved credit limits based on the counterparty\u2019s credit rating. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfCreditRiskExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-775": {
   "value": "D.2 Receivables 2022 2021 US$m US$m (a) Receivables (current) Trade receivables1 1,067  152 Other receivables1 381  123 Loans receivable 76  75 Lease receivables 35  18 Interest receivable 19  - 1,578  368 (b) Receivables (non-current) Other receivables 75  - Loans receivable 724  627 Lease receivables 46  26 De\ufb01ned bene\ufb01t plan asset - 33 845  686 1.  Interest-free and settlement terms are usually between 14 and 30 days. Recognition and measurement Trade receivables are initially recognised at the transaction price determined under AASB 15/ IFRS 15 Revenue from Contracts with Customers. Other receivables are initially recognised at fair value. Receivables that satisfy the contractual cash \ufb02ow and business model tests are subsequently measured at amortised cost less an allowance for uncollectable amounts. Uncollectable amounts are determined using the expected loss impairment model. Collectability and impairment are assessed on a regular basis. Subsequent recoveries of amounts previously written off are credited against other expenses in the consolidated income statement. Certain receivables that do not satisfy the contractual cash \ufb02ow and business model tests are subsequently measured at fair value (refer to Note D.6). The Group\u2019s customers are required to pay in accordance with agreed payment terms. Depending on the product, settlement terms are 14 to 30 days from the date of invoice or bill of lading and customers regularly pay on time. There are no signi\ufb01cant overdue trade receivables as at the end of the reporting period (2021: nil). Fair value The carrying amount of trade and other receivables approximates their fair value. Foreign exchange risk The Group held $174 million of receivables at 31 December 2022 (2021: $121 million) in currencies other than US dollars (predominantly Australian dollars). Loans receivable On 9 January 2020, Woodside Energy Finance (UK) Ltd entered into a secured loan agreement with Petrosen (the Senegal National Oil Company), to provide up to $450 million for the purpose of funding Sangomar project costs. The facility has a maximum term of 12 years and semi-annual repayments of the loan are due to commence at the earlier of 12 months after RFSU or 30 June 2025. The carrying amount of the loan receivable is $408 million at 31 December 2022 (2021: $335 million), which approximates its fair value. The remaining balance of loans receivable is due from non-controlling interests. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTradeAndOtherReceivablesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-807": {
   "value": "Recognition and measurement Trade receivables are initially recognised at the transaction price determined under AASB 15/ IFRS 15 Revenue from Contracts with Customers. Other receivables are initially recognised at fair value. Receivables that satisfy the contractual cash \ufb02ow and business model tests are subsequently measured at amortised cost less an allowance for uncollectable amounts. Uncollectable amounts are determined using the expected loss impairment model. Collectability and impairment are assessed on a regular basis. Subsequent recoveries of amounts previously written off are credited against other expenses in the consolidated income statement. Certain receivables that do not satisfy the contractual cash \ufb02ow and business model tests are subsequently measured at fair value (refer to Note D.6). The Group\u2019s customers are required to pay in accordance with agreed payment terms. Depending on the product, settlement terms are 14 to 30 days from the date of invoice or bill of lading and customers regularly pay on time. There are no signi\ufb01cant overdue trade receivables as at the end of the reporting period (2021: nil). Fair value The carrying amount of trade and other receivables approximates their fair value. Foreign exchange risk The Group held $174 million of receivables at 31 December 2022 (2021: $121 million) in currencies other than US dollars (predominantly Australian dollars). Loans receivable On 9 January 2020, Woodside Energy Finance (UK) Ltd entered into a secured loan agreement with Petrosen (the Senegal National Oil Company), to provide up to $450 million for the purpose of funding Sangomar project costs. The facility has a maximum term of 12 years and semi-annual repayments of the loan are due to commence at the earlier of 12 months after RFSU or 30 June 2025. The carrying amount of the loan receivable is $408 million at 31 December 2022 (2021: $335 million), which approximates its fair value. The remaining balance of loans receivable is due from non-controlling interests. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForTradeAndOtherReceivablesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-776": {
   "value": "D.3 Inventories 2022 2021 US$m US$m (a) Inventories (current) Petroleum products Goods in transit 95  35 Finished stocks 103  34 Warehouse stores and materials 480  133 678  202 (b) Inventories (non-current) Warehouse stores and materials 11  19 11  19 Recognition and measurement Inventories include hydrocarbon stocks, consumable supplies and maintenance spares. Inventories are valued at the lower of cost and net realisable value. Cost is determined on a weighted average basis and includes direct costs and an appropriate portion of \ufb01xed and variable production overheads where applicable. Inventories determined to be obsolete or damaged are written down to net realisable value, being the estimated selling price less selling costs. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfInventoriesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-808": {
   "value": "Recognition and measurement Inventories include hydrocarbon stocks, consumable supplies and maintenance spares. Inventories are valued at the lower of cost and net realisable value. Cost is determined on a weighted average basis and includes direct costs and an appropriate portion of \ufb01xed and variable production overheads where applicable. Inventories determined to be obsolete or damaged are written down to net realisable value, being the estimated selling price less selling costs. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForMeasuringInventories",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-777": {
   "value": "D.4 Payables The following table shows the Group\u2019s payables balances. 2022 2021 US$m US$m Trade payables1 759  191 Other payables1 1,270  390 Interest payable2 65  58 Total payables 2,094  639 1.  Interest-free and normally settled on 30 day terms. 2.  Details regarding interest-bearing liabilities are contained in Note C.2. Recognition and measurement Trade and other payables are carried at amortised cost and are recognised when goods and services are received, whether or not billed to the Group, prior to the end of the reporting period. Fair value The carrying amount of payables approximates their fair value. Foreign exchange risk The Group held $657 million of payables at 31 December 2022  (2021: $311 million) in currencies other than US dollars (predominantly Australian dollars). Maturity pro\ufb01le of payables The Group\u2019s payables balances at 31 December 2022 and 31 December 2021 are due for payment within a year. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTradeAndOtherPayablesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-810": {
   "value": "Recognition and measurement Trade and other payables are carried at amortised cost and are recognised when goods and services are received, whether or not billed to the Group, prior to the end of the reporting period. Fair value The carrying amount of payables approximates their fair value. Foreign exchange risk The Group held $657 million of payables at 31 December 2022  (2021: $311 million) in currencies other than US dollars (predominantly Australian dollars). Maturity pro\ufb01le of payables The Group\u2019s payables balances at 31 December 2022 and 31 December 2021 are due for payment within a year. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForTradeAndOtherPayablesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-778": {
   "value": "D.5 Provisions Restoration1 Employee bene\ufb01ts Onerous contracts 2 Other Total US$m US$m US$m US$m US$m Year ended 31 December 2022 At 1 January 2022 2,218  286  214  106  2,824 Acquisitions through business combination3 4,310  329  - 165  4,804 Change in provision (382) (98) (216) 137  (559) Unwinding of present value discount 107  - 2  1  110 Carrying amount at 31 December 2022 6,253  517  - 409  7,179 Current  575  331  - 313  1,219 Non-current  5,678  186  - 96  5,960 Net carrying amount 6,253  517  - 409  7,179 Year ended 31 December 2021 At 1 January 2021 2,134  295  349  129  2,907 Change in provision 60  (9) (140) (23) (112) Unwinding of present value discount 24  - 5  - 29 Carrying amount at 31 December 2021 2,218  286  214  106  2,824 Current  235  269  - 101  605 Non-current  1,983  17  214  5  2,219 Net carrying amount 2,218  286  214  106  2,824 1.  2022 change in provision is due to a revision of discount rates of $978 million (primarily due to an increase in risk free rates) and provisions used of $262 million, offset by changes in estimates of $858 million. Changes in estimates are due to new activities, increase in scope of removal and cost and rate escalations supported by the most recent estimates and benchmarks. 2.  2022 change in provision is due to changes in estimates of $245 million offset by provisions used of $29 million. 3.  Acquisitions through business combination have been recognised on a provisional basis. Adjustments will be made to the provisional amounts if new information is obtained within 12 months from the acquisition date. Refer to Note B.5 for details. Recognition and measurement Provisions are recognised when the Group has a present obligation (legal or constructive) as a result of a past event, it is probable that an out\ufb02ow of resources embodying economic bene\ufb01ts will be required to settle the obligation and a reliable estimate can be made of the amount of the obligation. Restoration The restoration provision is \ufb01rst recognised in the period in which the obligation arises. The nature of restoration activities includes the removal of facilities, abandonment of wells and restoration of affected areas. Restoration provisions are updated annually, with the corresponding movement recognised against the related exploration and evaluation assets or oil and gas properties or expensed for late life projects with no corresponding asset. Over time, the liability is increased for the change in the present value based on a pre-tax discount rate appropriate to the risks inherent in the liability. The unwinding of the discount is recorded as an accretion charge within \ufb01nance costs. The carrying amount capitalised in oil and gas properties is depreciated over the useful life of the related asset (refer to Note B.3). Costs incurred that relate to an existing condition caused by  past operations, and which do not have a future economic bene\ufb01t, are expensed. Key estimates and judgements (a) Restoration obligations The Group estimates the future decommissioning and remediation costs of offshore oil and gas platforms, offshore and onshore production facilities, wells and pipelines at different stages of the development and construction of assets or facilities. In many instances, decommissioning of assets occurs many years into the future. The Group\u2019s restoration obligations are based on compliance with the requirements of relevant regulations which vary for different jurisdictions. For example Australian regulations require full removal for offshore assets unless regulator approval is received to decommission in-situ. The Group maintains technical expertise to ensure that industry learnings, scienti\ufb01c research and local and international guidelines are reviewed in assessing its restoration obligations. The restoration obligation requires judgemental assumptions regarding removal date, environmental legislation and regulations, the extent of restoration activities required, the engineering methodology for estimating cost, technologies used in determining the decommissioning cost, and liability-speci\ufb01c discount rates to determine the present value of these cash \ufb02ows. The Group applies either the \u2018expected outcome\u2019 approach or \u2018expected value\u2019 approach in assessing the cost estimate, re\ufb02ecting a difference in approach to cost estimation for heritage Woodside and heritage BHPP assets. Both approaches are supported by AASB 137/ IAS 37 Provisions, Contingent Liabilities and Contingent Assets, produce reliable estimates and are widely used in practice. Heritage Woodside assets refer to assets held by the Group prior to the BHPP merger. Heritage BHPP assets refers to assets acquired from BHP but excludes the commonly held assets by both heritage entities. Expected outcome approach This approach is used for heritage Woodside assets, and those assets commonly held by both heritage entities. The following cost assumptions are applied: \u2022  for onshore assets, provision has been made for the removal of production facilities and above ground pipelines using current restoration standards and techniques and taking into account risks and uncertainties; and \u2022  for offshore assets, provision has been made for the plug and abandonment of wells and the removal of offshore platform topsides, \ufb02oating production storage offloading (FPSO) and some subsea infrastructure. It is currently the Group\u2019s assumption that in some regulatory jurisdictions and environments, certain pipelines and infrastructure, parts of offshore platform substructures, and certain subsea infrastructure are decommissioned in-situ where it can be demonstrated that this will deliver equal or better environmental outcomes than full removal and that regulatory approval is obtained where arrangements are satisfactory to the regulator. Expected value approach This approach is used for heritage BHPP assets (excluding those commonly held by both heritage entities). For both onshore and offshore assets, provision has been made taking into consideration a risked range of possible removal outcomes, including full removal of certain assets. Individual site provisions are an estimate of the expected value of future cash \ufb02ows required to rehabilitate the relevant site using current restoration standards and techniques and taking into account risks and uncertainties. Individual site provisions are discounted to their present value using country speci\ufb01c discount rates aligned to the estimated timing of cash out\ufb02ows. Inherent uncertainties The basis of the restoration obligation provision for assets with approved decommissioning plans or general directions issued by the regulator can differ from the assumptions disclosed above. Whilst the provisions re\ufb02ect the Group\u2019s best estimate based on current knowledge and information, further studies and detailed analysis of the restoration activities for individual assets will be performed near the end of their operational life and/or when detailed decommissioning plans are required to be submitted to the relevant regulatory authorities. Actual costs and cash out\ufb02ows can materially differ from the current estimate as a result of changes in regulations and their application, prices, analysis of site conditions, further studies, timing of restoration and changes in removal technology. These uncertainties may result in actual expenditure differing from amounts included in the provision recognised as at 31 December 2022. A range of pre-tax discount rates between 3.4% and 4.7% (2021: 0.4% to 2.4%) has been applied. If the discount rates were decreased by 0.5% then the provision would be $316 million higher. If the cost estimates were increased by 10% then the provision would be $627 million higher. The proportion of the non-current balance not expected to be settled within 10 years is 54% (2021: 65%). (b) Legal case outcomes Provisions for legal cases are measured at the present value of the amount expected to settle the claim. Management is required to use judgement when assessing the likely outcome of legal cases, estimating the risked amount and whether a provision or contingent liability should be recognised. Employee bene\ufb01ts Provision is made for employee bene\ufb01ts accumulated as a result of employees rendering services up to the end of the reporting period. These bene\ufb01ts include wages, salaries, annual leave and long service leave. Liabilities in respect of employees\u2019 services rendered that are not expected to be wholly settled within one year after the end of the period in which the employees render the related services are recognised as long-term employee bene\ufb01ts. These liabilities are measured at the present value of the estimated future cash out\ufb02ow to the employees using the projected unit credit method. Liabilities expected to be wholly settled within one year after the end of the period in which the employees render the related services are classi\ufb01ed as short- term bene\ufb01ts and are measured at the amount due to be paid. Onerous contract provision Provision is made for loss-making contracts at the present value of the lower of the net cost of ful\ufb01lling and the cost arising from failure to ful\ufb01ll each contract. (c) Onerous contracts The onerous contract provision assessment requires management to make certain estimates regarding the unavoidable costs and the expected economic bene\ufb01ts from the contract. These estimates require signi\ufb01cant management judgement and are subject to risk and uncertainty, and hence changes in economic conditions can affect the assumptions. As at 31 December 2022, the Corpus Christi contract is expected to return a positive value and on this basis the provision has been reversed to nil (2021: $214 million). Changes in assumptions predominantly relating to the narrowing of the spread between the sales price and purchase price could result in the contract becoming onerous in the future. Assumptions used to determine the present value as at 31 December 2022 are set out below: \u2022  Remaining contract term \u2013 18 years. \u2022  Discount rate \u2013 a pre-tax, risk free US government bond rate  of 4.10% (2021: 1.855%) has been applied. \u2022  LNG pricing \u2013 forecast sales and purchase prices are subject to a number of price markers. Price assumptions are based on the best information on the market available at measurement date and derived from short- and long-term views of global supply and demand, building upon past experience of the industry and consistent with external sources. The forecasted sales are linked to gas hub prices (Title Transfer Facility (TTF)) at which physical sales are expected to occur and incorporate known sales pricing information . The long-term gas sales price is estimated on the basis of the Group\u2019s Brent price forecast. The estimated purchase price is linked to US gas hub prices (Henry Hub (HH)) at which physical purchases are expected to occur. The nominal TTF, Brent oil prices and HH gas prices used at 31 December 2022 were: 2023 2024 2025 2026 2027 TTF (US$/MMBtu) 47.9 36.4 22.3 8.8 9.0 Brent (US$/bbl) 87 78 74 76 77\u00b2 HH (US$/MMBtu) 6.1 4.7 4.0 4.1 4.23 1.  For committed volumes, contracted pricing has been applied. 2. Long-term oil prices are based on US$70/bbl (2022 real terms) from 2025 and prices are escalated at 2.0% onwards. 3. Long-term gas prices are based on US$3.8/MMBtu (2022 real terms) from 2025. All long-term prices are escalated at 2.0%. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfProvisionsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-809": {
   "value": "Recognition and measurement Provisions are recognised when the Group has a present obligation (legal or constructive) as a result of a past event, it is probable that an out\ufb02ow of resources embodying economic bene\ufb01ts will be required to settle the obligation and a reliable estimate can be made of the amount of the obligation. Restoration The restoration provision is \ufb01rst recognised in the period in which the obligation arises. The nature of restoration activities includes the removal of facilities, abandonment of wells and restoration of affected areas. Restoration provisions are updated annually, with the corresponding movement recognised against the related exploration and evaluation assets or oil and gas properties or expensed for late life projects with no corresponding asset. Over time, the liability is increased for the change in the present value based on a pre-tax discount rate appropriate to the risks inherent in the liability. The unwinding of the discount is recorded as an accretion charge within \ufb01nance costs. The carrying amount capitalised in oil and gas properties is depreciated over the useful life of the related asset (refer to Note B.3). Costs incurred that relate to an existing condition caused by  past operations, and which do not have a future economic bene\ufb01t, are expensed. Key estimates and judgements (a) Restoration obligations The Group estimates the future decommissioning and remediation costs of offshore oil and gas platforms, offshore and onshore production facilities, wells and pipelines at different stages of the development and construction of assets or facilities. In many instances, decommissioning of assets occurs many years into the future. The Group\u2019s restoration obligations are based on compliance with the requirements of relevant regulations which vary for different jurisdictions. For example Australian regulations require full removal for offshore assets unless regulator approval is received to decommission in-situ. The Group maintains technical expertise to ensure that industry learnings, scienti\ufb01c research and local and international guidelines are reviewed in assessing its restoration obligations. The restoration obligation requires judgemental assumptions regarding removal date, environmental legislation and regulations, the extent of restoration activities required, the engineering methodology for estimating cost, technologies used in determining the decommissioning cost, and liability-speci\ufb01c discount rates to determine the present value of these cash \ufb02ows. The Group applies either the \u2018expected outcome\u2019 approach or \u2018expected value\u2019 approach in assessing the cost estimate, re\ufb02ecting a difference in approach to cost estimation for heritage Woodside and heritage BHPP assets. Both approaches are supported by AASB 137/ IAS 37 Provisions, Contingent Liabilities and Contingent Assets, produce reliable estimates and are widely used in practice. Heritage Woodside assets refer to assets held by the Group prior to the BHPP merger. Heritage BHPP assets refers to assets acquired from BHP but excludes the commonly held assets by both heritage entities. Expected outcome approach This approach is used for heritage Woodside assets, and those assets commonly held by both heritage entities. The following cost assumptions are applied: \u2022  for onshore assets, provision has been made for the removal of production facilities and above ground pipelines using current restoration standards and techniques and taking into account risks and uncertainties; and \u2022  for offshore assets, provision has been made for the plug and abandonment of wells and the removal of offshore platform topsides, \ufb02oating production storage offloading (FPSO) and some subsea infrastructure. It is currently the Group\u2019s assumption that in some regulatory jurisdictions and environments, certain pipelines and infrastructure, parts of offshore platform substructures, and certain subsea infrastructure are decommissioned in-situ where it can be demonstrated that this will deliver equal or better environmental outcomes than full removal and that regulatory approval is obtained where arrangements are satisfactory to the regulator. Expected value approach This approach is used for heritage BHPP assets (excluding those commonly held by both heritage entities). For both onshore and offshore assets, provision has been made taking into consideration a risked range of possible removal outcomes, including full removal of certain assets. Individual site provisions are an estimate of the expected value of future cash \ufb02ows required to rehabilitate the relevant site using current restoration standards and techniques and taking into account risks and uncertainties. Individual site provisions are discounted to their present value using country speci\ufb01c discount rates aligned to the estimated timing of cash out\ufb02ows. Inherent uncertainties The basis of the restoration obligation provision for assets with approved decommissioning plans or general directions issued by the regulator can differ from the assumptions disclosed above. Whilst the provisions re\ufb02ect the Group\u2019s best estimate based on current knowledge and information, further studies and detailed analysis of the restoration activities for individual assets will be performed near the end of their operational life and/or when detailed decommissioning plans are required to be submitted to the relevant regulatory authorities. Actual costs and cash out\ufb02ows can materially differ from the current estimate as a result of changes in regulations and their application, prices, analysis of site conditions, further studies, timing of restoration and changes in removal technology. These uncertainties may result in actual expenditure differing from amounts included in the provision recognised as at 31 December 2022. A range of pre-tax discount rates between 3.4% and 4.7% (2021: 0.4% to 2.4%) has been applied. If the discount rates were decreased by 0.5% then the provision would be $316 million higher. If the cost estimates were increased by 10% then the provision would be $627 million higher. The proportion of the non-current balance not expected to be settled within 10 years is 54% (2021: 65%). (b) Legal case outcomes Provisions for legal cases are measured at the present value of the amount expected to settle the claim. Management is required to use judgement when assessing the likely outcome of legal cases, estimating the risked amount and whether a provision or contingent liability should be recognised. Employee bene\ufb01ts Provision is made for employee bene\ufb01ts accumulated as a result of employees rendering services up to the end of the reporting period. These bene\ufb01ts include wages, salaries, annual leave and long service leave. Liabilities in respect of employees\u2019 services rendered that are not expected to be wholly settled within one year after the end of the period in which the employees render the related services are recognised as long-term employee bene\ufb01ts. These liabilities are measured at the present value of the estimated future cash out\ufb02ow to the employees using the projected unit credit method. Liabilities expected to be wholly settled within one year after the end of the period in which the employees render the related services are classi\ufb01ed as short- term bene\ufb01ts and are measured at the amount due to be paid. Onerous contract provision Provision is made for loss-making contracts at the present value of the lower of the net cost of ful\ufb01lling and the cost arising from failure to ful\ufb01ll each contract. (c) Onerous contracts The onerous contract provision assessment requires management  to make certain estimates regarding the unavoidable costs and the  expected economic bene\ufb01ts from the contract. These estimates  require signi\ufb01cant management judgement and are subject to risk and  uncertainty, and hence changes in economic conditions can affect the  assumptions.  As at 31 December 2022, the Corpus Christi contract is expected  to return a positive value and on this basis the provision has  been reversed to nil (2021: $214 million). Changes in assumptions  predominantly relating to the narrowing of the spread between the  sales price and purchase price could result in the contract becoming  onerous in the future. Assumptions used to determine the present value as at 31 December  2022 are set out below: \u2022  Remaining contract term \u2013 18 years. \u2022  Discount rate \u2013 a pre-tax, risk free US government bond rate  of 4.10% (2021: 1.855%) has been applied. \u2022  LNG pricing \u2013 forecast sales and purchase prices are subject to  a number of price markers. Price assumptions are based on the  best information on the market available at measurement date  and derived from short- and long-term views of global supply  and demand, building upon past experience of the industry and  consistent with external sources. The forecasted sales are linked  to gas hub prices (Title Transfer Facility (TTF)) at which physical  sales are expected to occur and incorporate known sales pricing  information . The long-term gas sales price is estimated on the basis  of the Group\u2019s Brent price forecast. The estimated purchase price  is linked to US gas hub prices (Henry Hub (HH)) at which physical  purchases are expected to occur. The nominal TTF, Brent oil prices  and HH gas prices used at 31 December 2022 were:  2023 2024 2025 2026 2027 TTF (US$/MMBtu) 47.9 36.4 22.3 8.8 9.0 Brent (US$/bbl) 87 78 74 76 77\u00b2 HH (US$/MMBtu) 6.1 4.7 4.0 4.1 4.23 1.  For committed volumes, contracted pricing has been applied.  2. Long-term oil prices are based on US$70/bbl (2022 real terms) from 2025  and prices are escalated at 2.0% onwards. 3. Long-term gas prices are based on US$3.8/MMBtu (2022 real terms) from  2025. All long-term prices are escalated at 2.0%",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForProvisionsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-825": {
   "value": "Restoration The restoration provision is \ufb01rst recognised in the period in which the obligation arises. The nature of restoration activities includes the removal of facilities, abandonment of wells and restoration of affected areas. Restoration provisions are updated annually, with the corresponding movement recognised against the related exploration and evaluation assets or oil and gas properties or expensed for late life projects with no corresponding asset. Over time, the liability is increased for the change in the present value based on a pre-tax discount rate appropriate to the risks inherent in the liability. The unwinding of the discount is recorded as an accretion charge within \ufb01nance costs. The carrying amount capitalised in oil and gas properties is depreciated over the useful life of the related asset (refer to Note B.3). Costs incurred that relate to an existing condition caused by  past operations, and which do not have a future economic bene\ufb01t, are expensed. Key estimates and judgements (a) Restoration obligations The Group estimates the future decommissioning and remediation costs of offshore oil and gas platforms, offshore and onshore production facilities, wells and pipelines at different stages of the development and construction of assets or facilities. In many instances, decommissioning of assets occurs many years into the future. The Group\u2019s restoration obligations are based on compliance with the requirements of relevant regulations which vary for different jurisdictions. For example Australian regulations require full removal for offshore assets unless regulator approval is received to decommission in-situ. The Group maintains technical expertise to ensure that industry learnings, scienti\ufb01c research and local and international guidelines are reviewed in assessing its restoration obligations. The restoration obligation requires judgemental assumptions regarding removal date, environmental legislation and regulations, the extent of restoration activities required, the engineering methodology for estimating cost, technologies used in determining the decommissioning cost, and liability-speci\ufb01c discount rates to determine the present value of these cash \ufb02ows. The Group applies either the \u2018expected outcome\u2019 approach or \u2018expected value\u2019 approach in assessing the cost estimate, re\ufb02ecting a difference in approach to cost estimation for heritage Woodside and heritage BHPP assets. Both approaches are supported by AASB 137/ IAS 37 Provisions, Contingent Liabilities and Contingent Assets, produce reliable estimates and are widely used in practice. Heritage Woodside assets refer to assets held by the Group prior to the BHPP merger. Heritage BHPP assets refers to assets acquired from BHP but excludes the commonly held assets by both heritage entities. Expected outcome approach This approach is used for heritage Woodside assets, and those assets commonly held by both heritage entities. The following cost assumptions are applied: \u2022  for onshore assets, provision has been made for the removal of production facilities and above ground pipelines using current restoration standards and techniques and taking into account risks and uncertainties; and \u2022  for offshore assets, provision has been made for the plug and abandonment of wells and the removal of offshore platform topsides, \ufb02oating production storage offloading (FPSO) and some subsea infrastructure. It is currently the Group\u2019s assumption that in some regulatory jurisdictions and environments, certain pipelines and infrastructure, parts of offshore platform substructures, and certain subsea infrastructure are decommissioned in-situ where it can be demonstrated that this will deliver equal or better environmental outcomes than full removal and that regulatory approval is obtained where arrangements are satisfactory to the regulator. Expected value approach This approach is used for heritage BHPP assets (excluding those commonly held by both heritage entities). For both onshore and offshore assets, provision has been made taking into consideration a risked range of possible removal outcomes, including full removal of certain assets. Individual site provisions are an estimate of the expected value of future cash \ufb02ows required to rehabilitate the relevant site using current restoration standards and techniques and taking into account risks and uncertainties. Individual site provisions are discounted to their present value using country speci\ufb01c discount rates aligned to the estimated timing of cash out\ufb02ows. Inherent uncertainties The basis of the restoration obligation provision for assets with approved decommissioning plans or general directions issued by the regulator can differ from the assumptions disclosed above. Whilst the provisions re\ufb02ect the Group\u2019s best estimate based on current knowledge and information, further studies and detailed analysis of the restoration activities for individual assets will be performed near the end of their operational life and/or when detailed decommissioning plans are required to be submitted to the relevant regulatory authorities. Actual costs and cash out\ufb02ows can materially differ from the current estimate as a result of changes in regulations and their application, prices, analysis of site conditions, further studies, timing of restoration and changes in removal technology. These uncertainties may result in actual expenditure differing from amounts included in the provision recognised as at 31 December 2022. A range of pre-tax discount rates between 3.4% and 4.7% (2021: 0.4% to 2.4%) has been applied. If the discount rates were decreased by 0.5% then the provision would be $316 million higher. If the cost estimates were increased by 10% then the provision would be $627 million higher. The proportion of the non-current balance not expected to be settled within 10 years is 54% (2021: 65%). (b) Legal case outcomes Provisions for legal cases are measured at the present value of the amount expected to settle the claim. Management is required to use judgement when assessing the likely outcome of legal cases, estimating the risked amount and whether a provision or contingent liability should be recognised. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDecommissioningRestorationAndRehabilitationProvisionsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-779": {
   "value": "D.6  Other \ufb01nancial assets and liabilities 2022 2021 US$m US$m Other \ufb01nancial assets Financial instruments at fair value through pro\ufb01t and loss Derivative \ufb01nancial instruments designated as hedges 207  134 Other \ufb01nancial assets 22  293 Financial instruments at amortised cost Hedge collateral (including interest) 509  - Other \ufb01nancial assets 30  - Financial instruments at fair value through other comprehensive income Other \ufb01nancial assets 29  - Total other \ufb01nancial assets 797  427 Current 677  320 Non-current 120  107 Net carrying amount 797  427 Other \ufb01nancial liabilities Financial instruments at fair value through pro\ufb01t and loss Derivative \ufb01nancial instruments designated as hedges 721  563 Other \ufb01nancial liabilities - 9 Total other \ufb01nancial liabilities 721  572 Current 654  411 Non-current  67  161 Net carrying amount 721  572 Recognition and measurement Other \ufb01nancial assets and liabilities Receivables subject to provisional pricing adjustments are initially recognised at the transaction price and subsequently measured at fair value with movements recognised in the consolidated income statement. Derivative \ufb01nancial instruments Derivative \ufb01nancial instruments that are designated within qualifying hedge relationships are initially recognised at fair value on the date the contract is entered into. For relationships designated as fair value hedges, subsequent fair value movements of the derivative are recognised in the consolidated income statement. For relationships designated as cash \ufb02ow hedges, subsequent fair value movements of the derivative for the effective portion of the hedge are recognised in other comprehensive income and accumulated in reserves in equity; fair value movements for the ineffective portion are recognised immediately in the consolidated income statement. Costs of hedging have been separated from the hedging arrangements and deferred to other comprehensive income and accumulated in reserves in equity. Amounts accumulated in equity are reclassi\ufb01ed to the consolidated income statement in the periods when the hedged item affects pro\ufb01t or loss. D.6  Other \ufb01nancial assets and liabilities (cont.) Derivative \ufb01nancial instruments  (cont.) Hedge effectiveness is determined at the inception of the hedge relationship, and through periodic prospective effectiveness assessments to ensure that an economic relationship exists between the hedged exposure and the hedging instrument. The Group assesses whether the derivative designated in each hedging relationship has been, and is expected to be, effective in offsetting changes in cash \ufb02ows of the hedged exposure using the hypothetical derivative method. Ineffectiveness is recognised where the cumulative change in the designated component value of the hedging instrument on an absolute basis exceeds the change in value of the hedged exposure attributable to the hedged risk. Ineffectiveness may arise where the timing of the transaction changes from what was originally estimated such as delayed shipments or changes in timing of forecast sales. This may also arise where the commodity swap pricing terms do not perfectly match the pricing terms of the LNG revenue contracts. Fair value Except for the other \ufb01nancial assets and other \ufb01nancial liabilities set out in this note, there are no material \ufb01nancial assets or \ufb01nancial liabilities carried at fair value. The fair value of commodity derivative \ufb01nancial instruments is determined based on observable quoted forward pricing and swap models and is classi\ufb01ed as Level 2 on the fair value hierarchy. The most frequently applied valuation techniques include forward pricing and swap models that use present value calculations. The models incorporate various inputs including the credit quality of counterparties and forward rate curves of the underlying commodity. The fair value of interest rate swaps is calculated by discounting estimated future cash \ufb02ows based on the terms of maturity of each contract, using market interest rates for a similar instrument at the reporting date and is classi\ufb01ed as Level 2 on the fair value hierarchy. The fair value of foreign exchange forward contracts is determined using quoted forward exchange rates at the reporting date and present value calculations based on high credit quality yield curves in the respective currencies and is classi\ufb01ed as Level 2 on the fair value hierarchy. The fair values of other \ufb01nancial assets and other \ufb01nancial liabilities are predominantly determined based on observable quoted forward pricing and are predominantly classi\ufb01ed as Level 2 on the fair value hierarchy. Foreign exchange The derivative \ufb01nancial instruments include foreign exchange forward contracts that are denominated in Australian dollars. The Group had no material other \ufb01nancial assets and liabilities denominated in currencies other than US dollars. Hedging activities During the period, the following hedging activities were undertaken: \u2022  The Group hedged a percentage of its oil-linked exposure, entering into oil swap derivatives settling in 2023 in order to achieve a minimum average sales price of $75 per barrel. \u2022  The Group entered into additional separate HH commodity swaps to hedge the purchase leg of the Corpus Christi volumes and separate TTF commodity swaps to hedge the sales leg of Corpus Christi volumes to mitigate pricing risk for 2023 to 2024. \u2022  As a result of hedging activities, approximately 49% of Corpus Christi volumes included in stock in transit for 2022, approximately 82% of 2023 volumes and approximately 29% of 2024 volumes have hedged pricing risk. \u2022  The Group restruck $150 million of the TTF hedges to reduce the derivative \ufb01nancial liability. \u2022  The Group restruck $92 million of the oil swap hedges to reduce the derivative \ufb01nancial liability. Further, the Group also voluntarily placed $506 million as collateral against the oil hedge positions to reduce counterparty credit risk exposure. The collateral will mature in line with hedge settlements in 2023. \u2022  Through the use of foreign exchange forward contracts, the Group hedged its Australian dollar to US dollar exchange rate in relation to a portion of the Australian dollar denominated capital expenditure expected to be incurred under the Scarborough development . D.6  Other \ufb01nancial assets and liabilities (cont.) Hedging activities (cont.) 2022 2021 Oil swaps (cash \ufb02ow hedges) Carrying amount (US$m)  (114)  (1) Notional amount (MMbbl)  18   30 Maturity date 2023 2022-2023 Hedge ratio  1:1  1:1 Weighted average hedged rate (US$/MMbbl)  79   74 HH Corpus Christi commodity swaps (cash \ufb02ow hedges) Carrying amount (US$m)  26   31 Notional amount (TBtu)  58   65 Maturity date  2023-2024  2022-2023 Hedge ratio  1:1  1:1 Weighted average hedged rate (US$/MMBtu)  4   3 TTF Corpus Christi commodity swaps (cash \ufb02ow hedges) Carrying amount (US$m)  (469)  (465) Notional amount (TBtu)  50   49 Maturity date  2023-2024  2022-2023 Hedge ratio  1:1  1:1 Weighted average hedged rate (US$/MMBtu)  16   9 TTF commodity swaps (cash \ufb02ow hedges) Carrying amount (US$m)  -   4 Notional amount (TBtu)  -   3 Maturity date  -   2022 Hedge ratio  -  1:1 Weighted average hedged rate (US$/MMBtu)  -   26 Interest rate swap (cash \ufb02ow hedges) Carrying amount (US$m)  55   (17) Notional amount (US$m)  600   600 Maturity date 2027 2027 Hedge ratio  1:1  1:1 Weighted average hedged rate 1.7% 1.7% Cross currency interest rate swap (cash \ufb02ow and fair value hedges) Carrying amount (US$m)  5   9 Notional amount (Swiss Franc)  175   175 Maturity date 2023 2023 Hedge ratio  1:1  1:1 Weighted average hedged rate Three month USD LIBOR  +2.8% Three month  USD LIBOR  +2.8% FX forwards (cash \ufb02ow hedges) Carrying amount (US$m)  (17)  10 Notional amount (AUD$m)  1,037   934 Maturity date  2023-2025   2022-2025 Hedge Ratio  1:1  1:1 Weighted average hedged rate (AUD:USD)  0.68   0.71 Hedge ineffectiveness loss of $72 million (2021: $38 million loss) has been recognised in the pro\ufb01t and loss. Other \ufb01nancial assets Other \ufb01nancial assets measured at fair value include receivables subject to provisional pricing adjustments of nil (2021: $163 million) and repurchase agreements entered into for the purposes of net settlement rather than for physical delivery of nil (2021: $69 million). Interest Rate Benchmark Reform A fundamental reform of major interest rate benchmarks is being undertaken globally, including the replacement of some interbank offered rates (IBORs) with alternative nearly risk-free rates (referred to as \u2018IBOR reform\u2019). The Group has exposures to IBORs on its \ufb01nancial instruments that will be impacted as part of these market-wide initiatives. The Group's main IBOR exposure at the reporting date is USD LIBOR. In 2020, the Federal Reserve announced that the three-month and six-month LIBOR will be phased out and eventually replaced by June 2023. During the period, the Group has transitioned a number of \ufb01nancial liabilities from USD LIBOR to SOFR and is in the process of transitioning the remaining \ufb01nancial instruments to alternative benchmark rates. The Group has \ufb01nancial liabilities and \ufb01nancial assets with a total carrying value of $670 million (2021: $957 million) and $393 million (2021: $367 million) respectively, which reference USD LIBOR. The Group has the following hedging relationships which are exposed to interest rate benchmarks impacted by IBOR Reform: \u2022  Interest rate swaps to hedge the LIBOR interest rate risk associated with the $600 million syndicated facility (refer to Note C.2). The interest rate swaps are designated as cash \ufb02ow hedges, converting the variable interest into \ufb01xed interest US dollar debt, and mature in 2027. \u2022  A \ufb01xed rate 175 million Swiss Franc (CHF) denominated medium term note, which it hedges with cross-currency interest rate swaps designated in both fair value and cash \ufb02ow hedge relationships. The cross-currency interest rate swaps are referenced to LIBOR (refer to Note C.2). The transition of a number of the Group\u2019s \ufb01nancial liabilities from USD LIBOR to SOFR during the year ended 31 December 2022 did not result in a material impact to the Group. The Group\u2019s Treasury function continues to execute the transition of the remaining \ufb01nancial instruments from current benchmark rates to alternative benchmark rates. Key estimates and judgements Fair value of other \ufb01nancial assets and liabilities Estimates have been applied in the measurement of other \ufb01nancial assets and liabilities and, where required, judgement is applied in the settlement of any \ufb01nancial assets or liabilities. In the current period, this included a $3 million periodic adjustment relating to timing which increased other \ufb01nancial liabilities, re\ufb02ecting the arrangements governing Wheatstone LNG sales (2021: $56 million increase).",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-811": {
   "value": "Recognition and measurement Other \ufb01nancial assets and liabilities Receivables subject to provisional pricing adjustments are  initially recognised at the transaction price and subsequently  measured at fair value with movements recognised in the  consolidated income statement.  Derivative \ufb01nancial instruments  Derivative \ufb01nancial instruments that are designated within  qualifying hedge relationships are initially recognised at fair  value on the date the contract is entered into. For relationships  designated as fair value hedges, subsequent fair value  movements of the derivative are recognised in the consolidated  income statement.  For relationships designated as cash \ufb02ow hedges, subsequent  fair value movements of the derivative for the effective portion  of the hedge are recognised in other comprehensive income  and accumulated in reserves in equity; fair value movements  for the ineffective portion are recognised immediately in the  consolidated income statement. Costs of hedging have been  separated from the hedging arrangements and deferred to  other comprehensive income and accumulated in reserves in  equity. Amounts accumulated in equity are reclassi\ufb01ed to the  consolidated income statement in the periods when the hedged  item affects pro\ufb01t or loss. Derivative \ufb01nancial instruments  (cont.) Hedge effectiveness is determined at the inception of the hedge  relationship, and through periodic prospective effectiveness  assessments to ensure that an economic relationship exists  between the hedged exposure and the hedging instrument.  The Group assesses whether the derivative designated in each  hedging relationship has been, and is expected to be, effective in  offsetting changes in cash \ufb02ows of the hedged exposure using  the hypothetical derivative method. Ineffectiveness is recognised where the cumulative change in  the designated component value of the hedging instrument on  an absolute basis exceeds the change in value of the hedged  exposure attributable to the hedged risk.  Ineffectiveness may arise where the timing of the transaction  changes from what was originally estimated such as delayed  shipments or changes in timing of forecast sales. This may also  arise where the commodity swap pricing terms do not perfectly  match the pricing terms of the LNG revenue contracts. Fair value Except for the other \ufb01nancial assets and other \ufb01nancial liabilities  set out in this note, there are no material \ufb01nancial assets or  \ufb01nancial liabilities carried at fair value.  The fair value of commodity derivative \ufb01nancial instruments  is determined based on observable quoted forward pricing  and swap models and is classi\ufb01ed as Level 2 on the fair value  hierarchy. The most frequently applied valuation techniques  include forward pricing and swap models that use present value  calculations. The models incorporate various inputs including the  credit quality of counterparties and forward rate curves of the  underlying commodity.  The fair value of interest rate swaps is calculated by discounting  estimated future cash \ufb02ows based on the terms of maturity  of each contract, using market interest rates for a similar  instrument at the reporting date and is classi\ufb01ed as Level 2  on the fair value hierarchy.  The fair value of foreign exchange forward contracts is  determined using quoted forward exchange rates at the  reporting date and present value calculations based on high  credit quality yield curves in the respective currencies and is  classi\ufb01ed as Level 2 on the fair value hierarchy. The fair values of other \ufb01nancial assets and other \ufb01nancial  liabilities are predominantly determined based on observable  quoted forward pricing and are predominantly classi\ufb01ed as  Level 2 on the fair value hierarchy. Key estimates and judgements Fair value of other \ufb01nancial assets and liabilities Estimates have been applied in the measurement of other \ufb01nancial  assets and liabilities and, where required, judgement is applied in  the settlement of any \ufb01nancial assets or liabilities. In the current  period, this included a $3 million periodic adjustment relating to  timing which increased other \ufb01nancial liabilities, re\ufb02ecting the  arrangements governing Wheatstone LNG sales (2021: $56 million  increase). ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-833": {
   "value": "Derivative \ufb01nancial instruments  Derivative \ufb01nancial instruments that are designated within  qualifying hedge relationships are initially recognised at fair  value on the date the contract is entered into. For relationships  designated as fair value hedges, subsequent fair value  movements of the derivative are recognised in the consolidated  income statement.  For relationships designated as cash \ufb02ow hedges, subsequent  fair value movements of the derivative for the effective portion  of the hedge are recognised in other comprehensive income  and accumulated in reserves in equity; fair value movements  for the ineffective portion are recognised immediately in the  consolidated income statement. Costs of hedging have been  separated from the hedging arrangements and deferred to  other comprehensive income and accumulated in reserves in  equity. Amounts accumulated in equity are reclassi\ufb01ed to the  consolidated income statement in the periods when the hedged  item affects pro\ufb01t or loss. Derivative \ufb01nancial instruments  (cont.) Hedge effectiveness is determined at the inception of the hedge  relationship, and through periodic prospective effectiveness  assessments to ensure that an economic relationship exists  between the hedged exposure and the hedging instrument.  The Group assesses whether the derivative designated in each  hedging relationship has been, and is expected to be, effective in  offsetting changes in cash \ufb02ows of the hedged exposure using  the hypothetical derivative method. Ineffectiveness is recognised where the cumulative change in  the designated component value of the hedging instrument on  an absolute basis exceeds the change in value of the hedged  exposure attributable to the hedged risk.  Ineffectiveness may arise where the timing of the transaction  changes from what was originally estimated such as delayed  shipments or changes in timing of forecast sales. This may also  arise where the commodity swap pricing terms do not perfectly  match the pricing terms of the LNG revenue contracts. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForHedgingExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-831": {
   "value": "Derivative \ufb01nancial instruments  Derivative \ufb01nancial instruments that are designated within  qualifying hedge relationships are initially recognised at fair  value on the date the contract is entered into. For relationships  designated as fair value hedges, subsequent fair value  movements of the derivative are recognised in the consolidated  income statement.  For relationships designated as cash \ufb02ow hedges, subsequent  fair value movements of the derivative for the effective portion  of the hedge are recognised in other comprehensive income  and accumulated in reserves in equity; fair value movements  for the ineffective portion are recognised immediately in the  consolidated income statement. Costs of hedging have been  separated from the hedging arrangements and deferred to  other comprehensive income and accumulated in reserves in  equity. Amounts accumulated in equity are reclassi\ufb01ed to the  consolidated income statement in the periods when the hedged  item affects pro\ufb01t or loss. Derivative \ufb01nancial instruments  (cont.) Hedge effectiveness is determined at the inception of the hedge  relationship, and through periodic prospective effectiveness  assessments to ensure that an economic relationship exists  between the hedged exposure and the hedging instrument.  The Group assesses whether the derivative designated in each  hedging relationship has been, and is expected to be, effective in  offsetting changes in cash \ufb02ows of the hedged exposure using  the hypothetical derivative method. Ineffectiveness is recognised where the cumulative change in  the designated component value of the hedging instrument on  an absolute basis exceeds the change in value of the hedged  exposure attributable to the hedged risk.  Ineffectiveness may arise where the timing of the transaction  changes from what was originally estimated such as delayed  shipments or changes in timing of forecast sales. This may also  arise where the commodity swap pricing terms do not perfectly  match the pricing terms of the LNG revenue contracts. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDerivativeFinancialInstrumentsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-826": {
   "value": "Derivative \ufb01nancial instruments  Derivative \ufb01nancial instruments that are designated within  qualifying hedge relationships are initially recognised at fair  value on the date the contract is entered into. For relationships  designated as fair value hedges, subsequent fair value  movements of the derivative are recognised in the consolidated  income statement.  For relationships designated as cash \ufb02ow hedges, subsequent  fair value movements of the derivative for the effective portion  of the hedge are recognised in other comprehensive income  and accumulated in reserves in equity; fair value movements  for the ineffective portion are recognised immediately in the  consolidated income statement. Costs of hedging have been  separated from the hedging arrangements and deferred to  other comprehensive income and accumulated in reserves in  equity. Amounts accumulated in equity are reclassi\ufb01ed to the  consolidated income statement in the periods when the hedged  item affects pro\ufb01t or loss. Derivative \ufb01nancial instruments  (cont.) Hedge effectiveness is determined at the inception of the hedge  relationship, and through periodic prospective effectiveness  assessments to ensure that an economic relationship exists  between the hedged exposure and the hedging instrument.  The Group assesses whether the derivative designated in each  hedging relationship has been, and is expected to be, effective in  offsetting changes in cash \ufb02ows of the hedged exposure using  the hypothetical derivative method. Ineffectiveness is recognised where the cumulative change in  the designated component value of the hedging instrument on  an absolute basis exceeds the change in value of the hedged  exposure attributable to the hedged risk.  Ineffectiveness may arise where the timing of the transaction  changes from what was originally estimated such as delayed  shipments or changes in timing of forecast sales. This may also  arise where the commodity swap pricing terms do not perfectly  match the pricing terms of the LNG revenue contracts. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForDerivativeFinancialInstrumentsAndHedgingExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-827": {
   "value": "Fair value Except for the other \ufb01nancial assets and other \ufb01nancial liabilities  set out in this note, there are no material \ufb01nancial assets or  \ufb01nancial liabilities carried at fair value.  The fair value of commodity derivative \ufb01nancial instruments  is determined based on observable quoted forward pricing  and swap models and is classi\ufb01ed as Level 2 on the fair value  hierarchy. The most frequently applied valuation techniques  include forward pricing and swap models that use present value  calculations. The models incorporate various inputs including the  credit quality of counterparties and forward rate curves of the  underlying commodity.  The fair value of interest rate swaps is calculated by discounting  estimated future cash \ufb02ows based on the terms of maturity  of each contract, using market interest rates for a similar  instrument at the reporting date and is classi\ufb01ed as Level 2  on the fair value hierarchy.  The fair value of foreign exchange forward contracts is  determined using quoted forward exchange rates at the  reporting date and present value calculations based on high  credit quality yield curves in the respective currencies and is  classi\ufb01ed as Level 2 on the fair value hierarchy. The fair values of other \ufb01nancial assets and other \ufb01nancial  liabilities are predominantly determined based on observable  quoted forward pricing and are predominantly classi\ufb01ed as  Level 2 on the fair value hierarchy. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForFairValueMeasurementExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-828": {
   "value": "Hedging activities During the period, the following hedging activities were  undertaken: \u2022  The Group hedged a percentage of its oil-linked exposure,  entering into oil swap derivatives settling in 2023 in order to  achieve a minimum average sales price of $75 per barrel.  \u2022  The Group entered into additional separate HH commodity  swaps to hedge the purchase leg of the Corpus Christi  volumes and separate TTF commodity swaps to hedge the  sales leg of Corpus Christi volumes to mitigate pricing risk for  2023 to 2024. \u2022  As a result of hedging activities, approximately 49% of  Corpus Christi volumes included in stock in transit for 2022,  approximately 82% of 2023 volumes and approximately 29%  of 2024 volumes have hedged pricing risk. \u2022  The Group restruck $150 million of the TTF hedges to reduce  the derivative \ufb01nancial liability.  \u2022  The Group restruck $92 million of the oil swap hedges to  reduce the derivative \ufb01nancial liability. Further, the Group also  voluntarily placed $506 million as collateral against the oil  hedge positions to reduce counterparty credit risk exposure.  The collateral will mature in line with hedge settlements  in 2023.  \u2022  Through the use of foreign exchange forward contracts, the  Group hedged its Australian dollar to US dollar exchange rate  in relation to a portion of the Australian dollar denominated  capital expenditure expected to be incurred under the  Scarborough development Hedging activities (cont.) 2022 2021 Oil swaps (cash \ufb02ow hedges) Carrying amount (US$m)  (114)  (1) Notional amount (MMbbl)  18   30 Maturity date 2023 2022-2023 Hedge ratio  1:1  1:1 Weighted average hedged rate (US$/MMbbl)  79   74 HH Corpus Christi commodity swaps (cash \ufb02ow hedges) Carrying amount (US$m)  26   31 Notional amount (TBtu)  58   65 Maturity date  2023-2024  2022-2023 Hedge ratio  1:1  1:1 Weighted average hedged rate (US$/MMBtu)  4   3 TTF Corpus Christi commodity swaps (cash \ufb02ow hedges) Carrying amount (US$m)  (469)  (465) Notional amount (TBtu)  50   49 Maturity date  2023-2024  2022-2023 Hedge ratio  1:1  1:1 Weighted average hedged rate (US$/MMBtu)  16   9 TTF commodity swaps (cash \ufb02ow hedges) Carrying amount (US$m)  -   4 Notional amount (TBtu)  -   3 Maturity date  -   2022 Hedge ratio  -  1:1 Weighted average hedged rate (US$/MMBtu)  -   26 Interest rate swap (cash \ufb02ow hedges) Carrying amount (US$m)  55   (17) Notional amount (US$m)  600   600 Maturity date 2027 2027 Hedge ratio  1:1  1:1 Weighted average hedged rate 1.7% 1.7% Cross currency interest rate swap (cash \ufb02ow and fair value hedges) Carrying amount (US$m)  5   9 Notional amount (Swiss Franc)  175   175 Maturity date 2023 2023 Hedge ratio  1:1  1:1 Weighted average hedged rate Three month USD LIBOR  +2.8% Three month  USD LIBOR  +2.8% FX forwards (cash \ufb02ow hedges) Carrying amount (US$m)  (17)  10 Notional amount (AUD$m)  1,037   934 Maturity date  2023-2025   2022-2025 Hedge Ratio  1:1  1:1 Weighted average hedged rate (AUD:USD)  0.68   0.71 Hedge ineffectiveness loss of $72 million (2021: $38 million loss) has been recognised in the pro\ufb01t and loss. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfHedgeAccountingExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-780": {
   "value": "D.7 Leases Land and buildings Plant and equipment 2 Total US$m US$m US$m Lease assets Year ended 31 December 2022 Carrying amount at 1 January 2022 377  703  1,080 Acquisitions through business combination1 120  22  142 Additions 4  238  242 Lease remeasurements 5  103  108 Depreciation (42) (266) (308) Carrying amount at 31 December 2022 464  800  1,264 At 31 December 2022 Historical cost and remeasurements 591  1,311  1,902 Accumulated depreciation, impairment and disposals (127) (511) (638) Net carrying amount 464  800  1,264 Lease liabilities Year ended 31 December 2022 At 1 January 2022 437  930  1,367 Acquisitions through business combination1 245  23  268 Additions 1  189  190 Repayments (principal and interest) (60) (305) (365) Accretion of interest 25  78  103 Lease remeasurements (25) 96  71 Carrying amount at 31 December 2022 623  1,011  1,634 Current  48  276  324 Non-current 575  735  1,310 Carrying amount at 31 December 2022 623  1,011  1,634 Lease assets Year ended 31 December 2021 Carrying amount at 1 January 2021 392  592  984 Additions 14  214  228 Lease remeasurements 15  16  31 Disposals at written down value (12) -  (12) Depreciation (32) (119) (151) Carrying amount at 31 December 2021 377  703  1,080 At 31 December 2021 Historical cost 462  948  1,410 Accumulated depreciation and impairment (85) (245) (330) Net carrying amount 377  703  1,080 Lease liabilities Year ended 31 December 2021 At 1 January 2021 484  794  1,278 Additions 7  244  251 Repayments (principal and interest) (70) (192) (262) Accretion of interest 25  72  97 Lease remeasurements  (9) 12  3 Carrying amount at 31 December 2021 437  930  1,367 Current  19  172  191 Non-current 418  758  1,176 Carrying amount at 31 December 2021 437  930  1,367 1.  Acquisitions through business combination have been recognised on a provisional basis. Adjustments will be made to the provisional amounts if new information is obtained within 12 months from the acquisition date. Refer to Note B.5 for details. 2.  Marine, vessels and carriers have been included within plant and equipment for the year ended 31 December 2022. The 2021 amounts have been reclassi\ufb01ed to be presented on the same basis. Recognition and measurement When a contract is entered into, the Group assesses whether the contract contains a lease. A lease arises when the Group has the right to direct the use of an identi\ufb01ed asset which is not substitutable and to obtain substantially all economic bene\ufb01ts from the use of the asset throughout the period of use. The leases recognised by the Group predominantly relate to LNG vessels, property and drilling rigs. The Group separates the lease and non-lease components of the contract and accounts for these separately. The Group allocates the consideration in the contract to each component on the basis of their relative stand-alone prices. Leases as a lessee Lease assets and lease liabilities are recognised at the lease commencement date, which is when the assets are available for use. The assets are initially measured at cost, which is the present value of future lease payments adjusted for any lease payments made at or before the commencement date, plus any make-good obligations and initial direct costs incurred. Lease assets are depreciated using the straight-line method over the shorter of their useful life and the lease term. Refer to Note B.3 for the useful lives of assets. Periodic adjustments are made for any re-measurements of the lease assets and for impairment losses, assessed in accordance with the Group\u2019s impairment policies. Lease liabilities are initially measured at the present value of future minimum lease payments, discounted using the Group\u2019s incremental borrowing rate if the rate implicit in the lease cannot be readily determined, and are subsequently measured at amortised cost using the effective interest rate. Minimum lease payments are \ufb01xed payments or index-based variable payments incorporating the Group\u2019s expectations of extension options and do not include non-lease components of a contract. A portfolio approach was taken when determining the implicit discount rate for LNG vessels with similar terms and conditions on transition. The lease liability is remeasured when there are changes in future lease payments arising from a change in rates, index or lease terms from exercising an extension or termination option. A corresponding adjustment is made to the carrying amount of the lease assets, with any excess recognised in the consolidated income statement. There are no restrictions placed upon the lessee by entering into these leases. Short-term leases and leases of low value Short-term leases (lease term of 12 months or less) and leases of low value assets are recognised as incurred as an expense in the consolidated income statement. Low value assets comprise plant and equipment. Foreign exchange risk The Group held $441 million of lease liabilities at 31 December 2022 (2021: $476 million) in currencies other than the US dollar (predominantly Australian dollars). Maturity pro\ufb01le of lease liabilities The table below presents the contractual undiscounted cash \ufb02ows associated with the Group\u2019s lease liabilities, representing principal and interest. The \ufb01gures will not necessarily reconcile with the amounts disclosed in the consolidated statement of \ufb01nancial position. 2022 2021 US$m US$m Due for payment in: 1 year or less  433   283 1-2 years  272   283 2-3 years  199   191 3-4 years  186   171 4-5 years  176   161 More than 5 years  966   789 2,232   1,878 Lease commitments The table below presents the contractual undiscounted cash \ufb02ows associated with the Group's future lease commitments for non-cancellable leases not yet commenced, representing principal and interest. 2022 2021 US$m US$m Due for payment: Within one year 67  80 After one year but not more than \ufb01ve years 263  159 Later than \ufb01ve years 1,288  49 1,618  288 Payments of $162 million (2021: $68 million) for short-term leases (lease term of 12 months or less) and payments of $12 million (2021: $18 million) for leases of low value assets were expensed in the consolidated income statement. Total payments for leases in the consolidated statement of cash \ufb02ows are $525 million (2021: $330 million), with $258 million (2021: $244 million) included in \ufb01nancing activities. The Group has short-term and/or low value lease commitments for marine vessels and carriers, property, drill rigs and plant and equipment contracted for, but not provided for in the \ufb01nancial statements, of $60 million (2021: $53 million). Key estimates and judgements (a) Control Judgement is required to assess whether a contract is or contains a lease at inception by assessing whether the Group has the right to direct the use of the identi\ufb01ed asset and obtain substantially all the economic bene\ufb01ts from the use of that asset. (b) Lease term Judgement is required when assessing the term of the lease and whether to include optional extension and termination periods. Option periods are only included in determining the lease term  at inception when they are reasonably certain to be exercised.  Lease terms are reassessed when a signi\ufb01cant change in circumstances occurs. On this basis, possible additional lease payments amounting to $2,323 million (2021: $1,654 million)  were not included in the measurement of lease liabilities. (c) lnterest in joint arrangements Judgement is required to determine the Group\u2019s rights and obligations for lease contracts within joint operations, to assess whether lease liabilities are recognised gross (100%) or in proportion to the Group\u2019s participating interest in the joint operation. This includes an evaluation of whether the lease arrangement contains  a sublease with the joint operation. (d) Discount rates Judgement is required to determine the discount rate, where the discount rate is the Group\u2019s incremental borrowing rate if the rate implicit in the lease cannot be readily determined. The incremental borrowing rate is determined with reference to the Group\u2019s borrowing portfolio at the inception of the arrangement or  the time of the modi\ufb01cation.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfLeasesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-812": {
   "value": "Recognition and measurement When a contract is entered into, the Group assesses whether  the contract contains a lease. A lease arises when the Group  has the right to direct the use of an identi\ufb01ed asset which is not  substitutable and to obtain substantially all economic bene\ufb01ts  from the use of the asset throughout the period of use. The  leases recognised by the Group predominantly relate to LNG  vessels, property and drilling rigs. The Group separates the lease and non-lease components of the  contract and accounts for these separately. The Group allocates  the consideration in the contract to each component on the  basis of their relative stand-alone prices. Leases as a lessee Lease assets and lease liabilities are recognised at the lease  commencement date, which is when the assets are available  for use. The assets are initially measured at cost, which is the  present value of future lease payments adjusted for any lease  payments made at or before the commencement date, plus any  make-good obligations and initial direct costs incurred. Lease assets are depreciated using the straight-line method over  the shorter of their useful life and the lease term. Refer to Note  B.3 for the useful lives of assets. Periodic adjustments are made  for any re-measurements of the lease assets and for impairment  losses, assessed in accordance with the Group\u2019s impairment  policies.  Lease liabilities are initially measured at the present value of  future minimum lease payments, discounted using the Group\u2019s  incremental borrowing rate if the rate implicit in the lease cannot  be readily determined, and are subsequently measured at  amortised cost using the effective interest rate. Minimum lease  payments are \ufb01xed payments or index-based variable payments  incorporating the Group\u2019s expectations of extension options and  do not include non-lease components of a contract. A portfolio  approach was taken when determining the implicit discount rate  for LNG vessels with similar terms and conditions on transition. The lease liability is remeasured when there are changes in  future lease payments arising from a change in rates, index or  lease terms from exercising an extension or termination option.  A corresponding adjustment is made to the carrying amount of  the lease assets, with any excess recognised in the consolidated  income statement. There are no restrictions placed upon the lessee by entering into  these leases. Short-term leases and leases of low value  Short-term leases (lease term of 12 months or less) and leases  of low value assets are recognised as incurred as an expense in  the consolidated income statement. Low value assets comprise  plant and equipment.  Key estimates and judgements (a) Control Judgement is required to assess whether a contract is or contains a  lease at inception by assessing whether the Group has the right to  direct the use of the identi\ufb01ed asset and obtain substantially all the  economic bene\ufb01ts from the use of that asset. (b) Lease term Judgement is required when assessing the term of the lease and  whether to include optional extension and termination periods.  Option periods are only included in determining the lease term  at inception when they are reasonably certain to be exercised.  Lease terms are reassessed when a signi\ufb01cant change in  circumstances occurs. On this basis, possible additional lease  payments amounting to $2,323 million (2021: $1,654 million)  were not included in the measurement of lease liabilities. (c) lnterest in joint arrangements  Judgement is required to determine the Group\u2019s rights and  obligations for lease contracts within joint operations, to assess  whether lease liabilities are recognised gross (100%) or in proportion  to the Group\u2019s participating interest in the joint operation. This  includes an evaluation of whether the lease arrangement contains  a sublease with the joint operation. (d) Discount rates Judgement is required to determine the discount rate, where the  discount rate is the Group\u2019s incremental borrowing rate if the rate  implicit in the lease cannot be readily determined. The incremental  borrowing rate is determined with reference to the Group\u2019s  borrowing portfolio at the inception of the arrangement or  the time of the modi\ufb01cation. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForLeasesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-781": {
   "value": "E.1  Contingent liabilities and assets 2022 2021 US$m US$m Contingent liabilities at reporting date Contingent liabilities 161  195 Guarantees 2  7 163  202 Contingent liabilities relate predominantly to possible obligations whose existence will only be con\ufb01rmed by the occurrence or non-occurrence of uncertain future events, and therefore the Group has not provided for such amounts in these \ufb01nancial statements. Additionally, there are a number of other claims and possible claims that have arisen in the course of business against entities in the Group, the outcome of which cannot be estimated at present and for which no amounts have been included in the table above. The Group has contingent assets of $199 million as at 31 December 2022 (2021: nil). ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfContingentLiabilitiesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-814": {
   "value": "Contingent liabilities relate predominantly to possible obligations whose existence will only be con\ufb01rmed by the occurrence or non-occurrence of uncertain future events, and therefore the Group has not provided for such amounts in these \ufb01nancial statements. Additionally, there are a number of other claims and possible claims that have arisen in the course of business against entities in the Group, the outcome of which cannot be estimated at present and for which no amounts have been included in the table above. The Group has contingent assets of $199 million as at 31 December 2022 (2021: nil). ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForContingentLiabilitiesAndContingentAssetsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-782": {
   "value": "E.2  Employee bene\ufb01ts 2022 2021 2020 US$m US$m US$m Employee bene\ufb01ts 415  217  252 Share-based payments 26  12  19 De\ufb01ned contribution plan costs 41  26  27 De\ufb01ned bene\ufb01t plan expense 9  1  2 491  256  300 (a) Employee bene\ufb01ts Employee bene\ufb01ts for the reporting period are as follows: Recognition and measurement The Group\u2019s accounting policy for employee bene\ufb01ts other than superannuation is set out in Note D.5. The policy relating to share-based payments is set out in Note E.2(c). All employees of the Group are entitled to bene\ufb01ts on retirement, disability or death from the Group\u2019s retirement plans. The Group operates a number of pension schemes throughout the world. Employees entitled to de\ufb01ned contribution schemes receive \ufb01xed contributions from Group companies and the Group\u2019s legal or constructive obligation is limited to these contributions. Contributions to de\ufb01ned contribution funds are recognised as an expense as they become payable. Prepaid contributions are recognised as an asset to the extent that a cash refund or a reduction in the future payment is available. (b) Compensation of key management personnel Key management personnel (KMP) compensation for the \ufb01nancial year was as follows: 2022 2021 2020 US$ US$ US$ Short-term employee bene\ufb01ts1 5,730,340  6,626,354  5,868,476 Post-employment bene\ufb01ts1 155,086  88,396  63,805 Share-based payments2 3,114,043  5,697,529  7,201,653 Long-term employee bene\ufb01ts  4,300  717,223  515,585 Termination bene\ufb01ts 152,531  2,447,525  390,087 9,156,300  15,577,027  14,039,606 1.  The 2021 comparatives for short-term employee bene\ufb01ts and post-employment bene\ufb01ts have been restated to include the superannuation component of the 2021 EIS cash and other cash bonuses for three key management personnel, increasing the short-term employee bene\ufb01ts expense by $26,676 to $6,626,354 and the post-employee bene\ufb01ts expense by $10,881 to $88,396. 2.  The 2021 comparative for share-based payments has been restated to include amortisation of the fair value of 2021 performance rights for two key management personnel, increasing the expense by $88,507 to $5,697,529. (c) Share plans The Group provides bene\ufb01ts to its employees (including KMP) in the form of share-based payments whereby employees render services for shares (equity-settled transactions). Woodside equity plan (WEP) and supplementary Woodside equity plan (SWEP) The WEP is available to all permanent employees, but since 1 January 2018 has excluded Executive Incentive Scheme (EIS) participants. The number of Equity Rights (ERs) offered to each eligible employee is determined by the Board, and based on individual performance as assessed under the performance review process. The linking of performance to an allocation allows the Group to recognise and reward eligible employees for high performance. The ERs have no further ongoing performance conditions after allocation, and do not require participants to make any payment in respect of the ERs at grant or at vesting. Each ER entitles the participant to receive  a Woodside share on the vesting date three years after the  grant date. For awards made in 2022, the Board amended the terms of the plan to entitle participants to receive a Woodside share on the vesting date, three years after the grant date. Awards made in 2020 and 2021 will vest under the terms of the plan at that time, which provided for 75% vesting of the ERs three years after the grant date and the remaining 25% of the ERs \ufb01ve years after the grant date. In October 2011, the Board approved the establishment of the SWEP to enable the offering of targeting retention awards of ERs for key capability. The SWEP was updated in 2022 to broaden eligibility to all employees of a subsidiary of Woodside Energy Group Ltd and ensure compliance in all jurisdictions in which Woodside operates. This facilitated the offer of replacement unvested incentives, as required under transitional arrangements for eligible heritage BHP employees transitioning from BHP Group Long-Term Incentive (LTI) plans to VAR offered under Woodside\u2019s VAR arrangements. Woodside equity plan (WEP) and supplementary Woodside equity plan (SWEP) (cont.) Each ER entitles the participant to receive a Woodside share or an American Depositary share on the vesting date either one, two, three or four years after the effective grant date, depending on the individual details of each SWEP offered. Participants do not make any payment in respect of the ERs at grant or at vesting. Executive Incentive Plans (EIP) The EIP operated as Woodside\u2019s Executive incentive framework until the end of 2017, after which the Board introduced the EIS. The EIP was used to deliver Short-Term Awards (STAs) and Long-Term Awards (LTAs) to Senior Executives. Short-Term Awards (STAs) STAs were delivered in the form of restricted shares to Executives, including all Executive KMP. There are no further performance conditions for vesting of deferred STAs. Participants are not required to make any payments in respect of STA awards at grant or at vesting. Restricted shares entitle their holders to receive dividends. Long-Term Awards (LTAs) LTAs were granted in the form of Performance Rights (PRs) to Executives, including all Executive KMP. Vesting of LTAs is subject to achievement of relative total shareholder return (RTSR) targets, with 33% measured against the ASX 50 and the remaining 67% tested against an international group of oil and gas companies. Participants are not entitled to receive dividends and are not required to make any payments in respect of LTA awards at grant or at vesting. Executive Incentive Scheme (EIS) The EIS was introduced for the 2018 performance year for all Executives including Executive KMP. The EIS is delivered in the form of a cash incentive, Restricted Shares and Performance Rights. The grant date of the Restricted Shares and Performance Rights has been determined to be subsequent to the performance year, being the date of the Board of Directors\u2019 approval. Accordingly, the 2021 Restricted Shares and Performance Rights were granted on 16 February 2022 for Executives and 19 May 2022 for the CEO and have been included in the table below. The expense estimated as at 31 December 2021 in relation to the 2021 performance year was updated to the fair value on grant date during the period. The 2022 Restricted Shares and Performance Rights have not been included in the table below as they have not been approved as at 31 December 2022. An expense related to the 2022 performance year has been estimated for the Restricted Shares and Performance Rights, using fair value estimates based on inputs at 31 December 2022. Performance Based Pay Plus (PBP Plus) PBP Plus is available to senior, permanent employees who are not Executives. Participants receive an annual award of cash and Restricted Shares based on corporate and individual performance, recognising and rewarding eligible employees for high performance. The grant date of the Restricted Shares has been determined to be subsequent to the performance year, being the date of the Board of Directors\u2019 approval. Accordingly, the 2021 Restricted Shares were granted on 16 February 2022 and have been included in the table below. The expense estimated as at 31 December 2021 in relation to the 2021 performance year was updated to the fair value on grant date during the period. The 2022 Restricted Shares have not been included in the table below as they have not been approved as at 31 December 2022. An expense related to the 2022 performance year has been estimated for the Restricted Shares, using fair value estimates based on inputs at 31 December 2022. Recognition and measurement All compensation under WEP, SWEP and Executive share plans is accounted for as share-based payments to employees for services provided. The cost of equity-settled transactions with employees is measured by reference to the fair values of the equity instruments at the date at which they are granted. The fair value of share-based payments is recognised, together with the corresponding increase in equity, over the period in which the vesting conditions are ful\ufb01lled, ending on the date on which the relevant employee becomes fully entitled to the shares. At each balance sheet date, the Group reassesses the number of awards that are expected to vest based on service conditions. The expense recognised each year takes into account the most recent estimate. The fair value of the bene\ufb01t provided for the WEP and SWEP is estimated using the Black-Scholes option pricing technique. The fair value of the restricted shares is estimated as the closing share price at grant date. The fair value of the bene\ufb01t provided for the RTSR PRs is calculated using the Binomial or Black-Scholes option pricing technique combined with a Monte Carlo simulation methodology, where relevant, using historical volatility to estimate the volatility of the share price in the future. E.2  Employee bene\ufb01ts (cont.) The number of awards and movements for all share plans are summarised as follows: Number of performance awards Employee plans Executive plans WEP SWEP STA4 LTA4 Year ended 31 December 2022 Opening balance 5,649,783  - 994,436  2,379,220 Granted during the year1,2,3 3,017,366  3,046,963  495,800  764,171 Vested during the year (1,498,065) (38,146) (450,609) (191,736 Forfeited during the year (539,403) (124,741) (46,430) (397,233) Awards at 31 December 2022 6,629,681  2,884,076  993,197  2,554,422 US$m US$m US$m US$m Fair value of awards granted during the year 49  60  9  13 Number of performance awards Employee plans Executive plans WEP SWEP STA4 LTA4 Year ended 31 December 2021 Opening balance 5,618,603  - 975,295  2,798,305 Granted during the year1,2,3 2,507,167  - 353,412  553,849 Vested during the year (1,999,676) - (307,402) (322,746) Forfeited during the year (476,311) - (26,869) (650,188) Awards at 31 December 2021 5,649,783  - 994,436  2,379,220 US$m US$m US$m US$m Fair value of awards granted during the year 39  - 7  9 1.  For the purpose of valuation, the share price on grant date for the 2022 WEP allocations was $16.30 (2021: $15.17). 2.  For the purpose of valuation, the share price on grant date for the 2022 SWEP allocations was $19.74 (2021: nil). 3.  For the purpose of valuation, the share price on grant date for Restricted Shares was $19.20 and $19.27 (2021: $20.18) and Performance Rights was $13.08 and $13.71 (2021: $11.66 and $14.44). 4.  Includes awards issued under EIP and EIS. For more detail on these share plans and performance rights issued to KMPs, refer to the Remuneration Report. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEmployeeBenefitsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-813": {
   "value": "Recognition and measurement The Group\u2019s accounting policy for employee bene\ufb01ts other than superannuation is set out in Note D.5. The policy relating to share-based payments is set out in Note E.2(c). All employees of the Group are entitled to bene\ufb01ts on retirement, disability or death from the Group\u2019s retirement plans. The Group operates a number of pension schemes throughout the world. Employees entitled to de\ufb01ned contribution schemes receive \ufb01xed contributions from Group companies and the Group\u2019s legal or constructive obligation is limited to these contributions. Contributions to de\ufb01ned contribution funds are recognised as an expense as they become payable. Prepaid contributions are recognised as an asset to the extent that a cash refund or a reduction in the future payment is available. Recognition and measurement  All compensation under WEP, SWEP and Executive share plans  is accounted for as share-based payments to employees for  services provided. The cost of equity-settled transactions with  employees is measured by reference to the fair values of the  equity instruments at the date at which they are granted. The  fair value of share-based payments is recognised, together with  the corresponding increase in equity, over the period in which  the vesting conditions are ful\ufb01lled, ending on the date on which  the relevant employee becomes fully entitled to the shares. At  each balance sheet date, the Group reassesses the number of  awards that are expected to vest based on service conditions.  The expense recognised each year takes into account the most  recent estimate.  The fair value of the bene\ufb01t provided for the WEP and SWEP is  estimated using the Black-Scholes option pricing technique.  The fair value of the restricted shares is estimated as the  closing share price at grant date. The fair value of the bene\ufb01t  provided for the RTSR PRs is calculated using the Binomial or  Black-Scholes option pricing technique combined with a Monte  Carlo simulation methodology, where relevant, using historical  volatility to estimate the volatility of the share price in the future. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForEmployeeBenefitsExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-815": {
   "value": "E.3  Related party transactions The Group\u2019s related party transactions are predominantly  with associates of the Group. During the period, the transactions with related parties include purchases of goods/services of $60.730 million, sale of goods/services of $18.527 million and dividend income of $8.294 million. As at 31 December 2022, the total amounts owing to related parties is $1.686 million and amounts owing from related parties is $2.200 million. All transactions to/from related parties are made at arm\u2019s length (normal market rates and on normal commercial terms). There were no transactions with directors during the year.  Key management personnel compensation is disclosed in  Note E.2(b). ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfTransactionsBetweenRelatedPartiesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-783": {
   "value": "E.3  Related party transactions The Group\u2019s related party transactions are predominantly  with associates of the Group. During the period, the transactions with related parties include purchases of goods/services of $60.730 million, sale of goods/services of $18.527 million and dividend income of $8.294 million. As at 31 December 2022, the total amounts owing to related parties is $1.686 million and amounts owing from related parties is $2.200 million. All transactions to/from related parties are made at arm\u2019s length (normal market rates and on normal commercial terms). There were no transactions with directors during the year.  Key management personnel compensation is disclosed in  Note E.2(b). ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfRelatedPartyExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-784": {
   "value": "E.4 <span class=\"_ _56\"> </span>Auditor r<span class=\"_ _1\"/>emunera<span class=\"_ _1\"/>tion<span class=\"_ _2e9\"> </span>For the year ended 31 December 2022, the auditor of Woodside Energy Group Ltd is PricewaterhouseCoopers Australia (PwC) (2021 and 2020: Ernst &amp; Young (EY)).<span class=\"_ _2e9\"> </span>202<span class=\"_ _4f\"/>2<span class=\"_ _47\"> </span><span class=\"ff20 ls0 ws0\">2021<span class=\"_ _c0\"> </span>2020<span class=\"_ _2e9\"> </span></span>US$000<span class=\"_ _e2\"> </span><span class=\"ff20\">US$000<span class=\"_ _e2\"> </span>US$000<span class=\"_ _2e9\"> </span></span>(a) Auditors of the Gr<span class=\"_ _1\"/>oup<span class=\"_ _2e9\"> </span>Amounts receiv<span class=\"_ _1\"/>ed or due and receiv<span class=\"_ _1\"/>able to:<span class=\"_ _2e9\"> </span>Pricew<span class=\"_ _1\"/>aterhouseC<span class=\"_ _1\"/>oopers (Austr<span class=\"_ _1\"/>alia)<span class=\"_ _2e9\"> </span>Audit and re<span class=\"_ _1\"/>vie<span class=\"_ _1\"/>w of \ufb01nancial reports<span class=\"_ _b6\"> </span><span class=\"ff1f\"> 2,8<span class=\"_ _1\"/>78 <span class=\"_ _5\"> </span><span class=\"ff20\"> - <span class=\"_ _165\"> </span> - </span></span>Assuranc<span class=\"_ _1\"/>e services <span class=\"_ _66\"> </span><span class=\"ff1f\"> 129 <span class=\"_ _18a\"> </span></span> - <span class=\"_ _165\"> </span> - Other assuranc<span class=\"_ _1\"/>e and agreed upon proc<span class=\"_ _1\"/>edures services<span class=\"_ _252\"> </span><span class=\"ff1f\"> 832 <span class=\"_ _5\"> </span></span> - <span class=\"_ _165\"> </span> - T<span class=\"_ _0\"/>ax services<span class=\"_ _e6\"> </span><span class=\"ff1f\"> - <span class=\"_ _165\"> </span></span> - <span class=\"_ _5\"> </span> - Other services<span class=\"_ _100\"> </span><span class=\"ff1f ls70 ws89\"> 41<span class=\"_ _4f\"/> <span class=\"_ _18a\"> </span></span> - <span class=\"_ _165\"> </span> - Other ov<span class=\"_ _1\"/>erseas member \ufb01rms of Pricew<span class=\"_ _1\"/>aterhouseC<span class=\"_ _1\"/>oopers (Austr<span class=\"_ _1\"/>alia)<span class=\"_ _2e9\"> </span>Audit of the \ufb01nancial reports of contr<span class=\"_ _1\"/>olled entities<span class=\"_ _46\"> </span><span class=\"ff1f ls83 ws9f\"> 1<span class=\"_ _4f\"/>,<span class=\"_ _4f\"/>2<span class=\"_ _4f\"/>74<span class=\"_ _50\"/> <span class=\"_ _5\"> </span></span> - <span class=\"_ _165\"> </span> - Other assuranc<span class=\"_ _1\"/>e and agreed upon proc<span class=\"_ _1\"/>edures services<span class=\"_ _26\"> </span><span class=\"ff1f\"> - <span class=\"_ _165\"> </span></span> - <span class=\"_ _5\"> </span> - T<span class=\"_ _0\"/>ax services<span class=\"_ _2a6\"> </span><span class=\"ff1f\"> 258 <span class=\"_ _5\"> </span></span> - <span class=\"_ _165\"> </span> - Other services<span class=\"_ _19c\"> </span><span class=\"ff1f\"> - <span class=\"_ _5\"> </span></span> - <span class=\"_ _165\"> </span> -  5,412 <span class=\"_ _18a\"> </span><span class=\"ff20\"> - <span class=\"_ _165\"> </span> - </span>(b) Other audit<span class=\"_ _1\"/>ors and their related network \ufb01rms<span class=\"_ _2e9\"> </span>Ernst &amp; Y<span class=\"_ _0\"/>oung<span class=\"_ _2e9\"> </span>Audit and re<span class=\"_ _1\"/>vie<span class=\"_ _1\"/>w of \ufb01nancial reports<span class=\"_ _17f\"> </span><span class=\"ff1f\"> 48 <span class=\"_ _e3\"> </span></span> 1,732 <span class=\"_ _e1\"> </span> 1,686 Assuranc<span class=\"_ _1\"/>e services <span class=\"_ _1a5\"> </span><span class=\"ff1f\"> 611 <span class=\"_ _c6\"> </span></span> 2,687 <span class=\"_ _165\"> </span> - Other assuranc<span class=\"_ _1\"/>e and agreed upon proc<span class=\"_ _1\"/>edures services<span class=\"_ _57\"> </span><span class=\"ff1f\"> 2,335 <span class=\"_ _188\"> </span></span> 33 <span class=\"_ _b4\"> </span> 140 T<span class=\"_ _0\"/>ax services<span class=\"_ _e6\"> </span><span class=\"ff1f\"> - <span class=\"_ _176\"> </span></span> 129 <span class=\"_ _15e\"> </span> 178 Other services<span class=\"_ _19c\"> </span><span class=\"ff1f\"> - <span class=\"_ _189\"> </span></span> 19 <span class=\"_ _165\"> </span> -  2,994 <span class=\"_ _f6\"> </span><span class=\"ff20\"> 4,600 <span class=\"_ _54\"> </span> 2,<span class=\"_ _1\"/>004</span>",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfAuditorsRemunerationExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-785": {
   "value": "E.5  Events after the end of the reporting period The Group has undertaken a review of the depreciation methodology and asset useful lives for oil and gas properties in accordance with its accounting policies and the accounting standards, considering the scale and diversity of the post- merger portfolio and to ensure alignment with common industry practice. In assessing useful lives of certain oil and gas assets, these have been approximated by reference to either their proved (1P) or proved plus probable (2P) reserves, which is then used in the units of production depreciation calculation. From 1 January 2023, upstream oil and conventional gas assets will be depreciated over proved reserves (previously proved plus probable, except for certain assets considered late life). Upstream LNG assets will continue to be depreciated over proved plus probable reserves. Multiproduct assets are assessed on a case-by-case basis and aligned to the most appropriate representation of useful life. The indicative impact to depreciation expense in 2023 resulting from the change in estimate is expected to be an increase of approximately $600 million. This is an indicative amount and is based on current forecasts which are subject to assumptions and uncertainties. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfEventsAfterReportingPeriodExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-786": {
   "value": "E.6 <span class=\"_ _1d\"> </span>Joint arr<span class=\"_ _1\"/>angements<span class=\"_ _2e9\"> </span>(a) Interest percentage in joint ventures<span class=\"_ _2e9\"> </span>Group Inter<span class=\"_ _1\"/>est %<span class=\"_ _2e9\"> </span>Entity <span class=\"_ _89\"> </span>Principal activity<span class=\"_ _10b\"> </span><span class=\"fc1\">2022<span class=\"_ _f6\"> </span><span class=\"ff20\">2021<span class=\"_ _2e9\"> </span></span></span>North W<span class=\"_ _1\"/>est Shelf Gas Pty Ltd<span class=\"_ _2e9\"> </span>Contr<span class=\"_ _1\"/>act administration services for v<span class=\"_ _1\"/>enturer<span class=\"_ _1\"/>s for LNG sales to Japan. Marketing and administra<span class=\"_ _1\"/>tion services for v<span class=\"_ _1\"/>enturers for gas proc<span class=\"_ _1\"/>essing. <span class=\"_ _172\"> </span><span class=\"ff1f\"> 33.33 <span class=\"_ _f9\"> </span></span> 16.67 North W<span class=\"_ _1\"/>est Shelf Liaison Company Pty Lt<span class=\"_ _1\"/>d<span class=\"_ _2e9\"> </span>Liaison for v<span class=\"_ _1\"/>enturers in the sale of LNG to the Japanese market.<span class=\"_ _cf\"> </span><span class=\"ff1f\"> 33.33 <span class=\"_ _af\"> </span></span> 16.67 China Administr<span class=\"_ _1\"/>ation Company Pty Lt<span class=\"_ _1\"/>d<span class=\"_ _2e9\"> </span>Contr<span class=\"_ _1\"/>act administration services for v<span class=\"_ _1\"/>enturer<span class=\"_ _1\"/>s for LNG sales to China.<span class=\"_ _a8\"> </span><span class=\"ff1f\"> 33.33 <span class=\"_ _f9\"> </span></span> 16.67 North W<span class=\"_ _1\"/>est Shelf Shipping Service Compan<span class=\"_ _1\"/>y Pty Ltd<span class=\"_ _148\"> </span>LNG vessel \ufb02eet advisor<span class=\"_ _0\"/>.<span class=\"_ _f5\"> </span><span class=\"ff1f\"> 33.33 <span class=\"_ _f9\"> </span></span> 16.67 North W<span class=\"_ _1\"/>est Shelf Lifting Coordina<span class=\"_ _1\"/>tor Pty Ltd<span class=\"_ _2e9\"> </span>Allocating, scheduling and administering the lifting of LNG and pipeline gas. <span class=\"_ _47\"> </span><span class=\"ff1f\"> 33.33 <span class=\"_ _af\"> </span></span> 16.67<span class=\"_ _2e9\"> </span>E.6 <span class=\"_ _1d\"> </span>Joint arr<span class=\"_ _1\"/>angement (<span class=\"_ _1\"/>cont.)<span class=\"_ _2e9\"> </span>(b) Interest percentage in joint operations<span class=\"_ _2e9\"> </span>Group Inter<span class=\"_ _1\"/>est %<span class=\"_ _2e9\"> </span>2022<span class=\"_ _165\"> </span><span class=\"ff20\">2021<span class=\"_ _2e9\"> </span></span>Producing and de<span class=\"_ _1\"/>veloping assets<span class=\"_ _2e9\"> </span>Austr<span class=\"_ _1\"/>alia<span class=\"_ _2e9\"> </span>North W<span class=\"_ _1\"/><span class=\"_ _2e9\">est Shelf1</span><span class=\"_ _26\"> </span><span class=\"ff1f\"> 25.0 - 66.7 <span class=\"_ _af\"> </span></span> 12.5 - 50.0<span class=\"_ _2e9\"> </span>Great<span class=\"_ _1\"/>er En\ufb01eld and Vincent<span class=\"_ _27c\"> </span><span class=\"ff1f ls1c ws22\"> 60.0<span class=\"_ _4f\"/> <span class=\"_ _ba\"> </span></span><span class=\"ls6e ws87\"> 60.0<span class=\"_ _2e9\"> </span></span>Stybarro<span class=\"_ _1\"/><span class=\"_ _2e9\">w2</span><span class=\"_ _39\"> </span><span class=\"ff1f\"> - <span class=\"_ _ba\"> </span></span><span class=\"ls6e ws87\"> 5<span class=\"_ _4f\"/>0.0<span class=\"_ _2e9\"> </span></span>Balnav<span class=\"_ _1\"/>es<span class=\"_ _10c\"> </span><span class=\"ff1f\"> 65.0 <span class=\"_ _b8\"> </span></span> 65.0<span class=\"_ _2e9\"> </span>Pluto<span class=\"_ _203\"> </span><span class=\"ff1f ls1c ws22\"> 90.0<span class=\"_ _4f\"/> <span class=\"_ _ba\"> </span></span><span class=\"ls6e ws87\"> 90.0<span class=\"_ _4f\"/> </span>Wheatstone<span class=\"_ _168\"> </span><span class=\"ff1f\"> 13.0 - 65.0 <span class=\"_ _f9\"> </span></span> 13.0 - 65.<span class=\"_ _1\"/>0<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">Scarborough2</span><span class=\"_ _3c\"> </span><span class=\"ff1f\"> - <span class=\"_ _b9\"> </span></span> 73.5<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">Bass Strait1</span><span class=\"_ _59\"> </span><span class=\"ff1f\"> 25.0 - 50.<span class=\"_ _1\"/>0 <span class=\"_ _5d\"> </span><span class=\"ff20\"> -<span class=\"_ _2e9\"> </span></span></span><span class=\"_ _2e9\">Macedon1</span><span class=\"_ _15a\"> </span><span class=\"ff1f ls2b ws32\"> 71.4 <span class=\"_ _a4\"> </span></span> -<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">Pyrenees1</span><span class=\"_ _77\"> </span><span class=\"ff1f\"> 40.0 - 71.4 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">Griffin1</span><span class=\"_ _159\"> </span><span class=\"ff1f\"> 45.0 - 71.0 <span class=\"_ _ab\"> </span></span> -<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">Minerva1</span><span class=\"_ _285\"> </span><span class=\"ff1f ls1c ws22\"> 90.0<span class=\"_ _4f\"/> <span class=\"_ _ab\"> </span></span> -<span class=\"_ _2e9\"> </span>International<span class=\"_ _2e9\"> </span>Sangomar <span class=\"_ _24d\"> </span><span class=\"ff1f\"> 82.0 <span class=\"_ _c7\"> </span></span> 82.0<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">Atlantis1</span><span class=\"_ _24e\"> </span><span class=\"ff1f\"> 44.<span class=\"_ _1\"/>0 <span class=\"_ _5d\"> </span><span class=\"ff20\"> -<span class=\"_ _2e9\"> </span></span></span><span class=\"_ _2e9\">Mad Dog1</span><span class=\"_ _1ad\"> </span><span class=\"ff1f\"> 23.9 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">Shenzi1</span><span class=\"_ _29e\"> </span><span class=\"ff1f\"> 72.0 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span>T<span class=\"_ _0\"/><span class=\"_ _2e9\">rion1</span><span class=\"_ _2a7\"> </span><span class=\"ff1f ls1c ws22\"> 60.0 <span class=\"_ _a4\"> </span></span> -<span class=\"_ _2e9\"> </span>Great<span class=\"_ _1\"/><span class=\"_ _2e9\">er Angostura1</span><span class=\"_ _1a5\"> </span><span class=\"ff1f\"> 45.0 - 68.5 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">Calypso1</span><span class=\"_ _108\"> </span><span class=\"ff1f ls1c ws22\"> 70.0 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span>Exploration and e<span class=\"_ _1\"/>valuation as<span class=\"_ _1\"/>sets<span class=\"_ _2e9\"> </span>Oceania<span class=\"_ _2e9\"> </span>Bro<span class=\"_ _1\"/>wse Basin<span class=\"_ _37\"> </span><span class=\"ff1f\"> 30.6 <span class=\"_ _b8\"> </span></span> 30.6<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">Carnarvon Basin3</span><span class=\"_ _88\"> </span><span class=\"ff1f\"> 31.6 - 70.<span class=\"_ _1\"/>0 <span class=\"_ _af\"> </span><span class=\"ff20\"> 15.8 - 70.0<span class=\"_ _2e9\"> </span></span></span>Scarborough2,3 - <span class=\"_ _164\"> </span><span class=\"ff20 ls6e ws87\"> 50.0<span class=\"_ _4f\"/> </span>Bonaparte Basin<span class=\"_ _18d\"> </span><span class=\"ff1f\"> 26.7 - 35.0 <span class=\"_ _c1\"> </span></span> 26.7 - 35.0<span class=\"_ _2e9\"> </span>Africa<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">Congo4</span><span class=\"_ _29e\"> </span><span class=\"ff1f\"> 22.5 <span class=\"_ _17f\"> </span></span> 42.5<span class=\"_ _2e9\"> </span>Senegal<span class=\"_ _5c\"> </span><span class=\"ff1f ls1c ws22\"> 90.0 <span class=\"_ _ba\"> </span></span><span class=\"ls6e ws87\"> 9<span class=\"_ _4f\"/>0.0<span class=\"_ _2e9\"> </span></span><span class=\"_ _2e9\">Egypt1</span><span class=\"_ _213\"> </span><span class=\"ff1f\"> 25.0 - 45.0 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span>Americas<span class=\"_ _2e9\"> </span>US Gulf of Mexic<span class=\"_ _1\"/><span class=\"_ _2e9\">o1</span><span class=\"_ _34\"> </span><span class=\"ff1f\"> 23.9 - 75.0 <span class=\"_ _ab\"> </span></span> -<span class=\"_ _2e9\"> </span>Kitimat<span class=\"_ _7b\"> </span><span class=\"ff1f ls1c ws22\"> 50.0 <span class=\"_ _b8\"> </span></span><span class=\"ls6e ws87\"> 50.0<span class=\"_ _4f\"/> </span>Asia<span class=\"_ _2e9\"> </span>Republic of K<span class=\"_ _1\"/>orea<span class=\"_ _40\"> </span><span class=\"ff1f ls1c ws22\"> 50.0 <span class=\"_ _b8\"> </span></span><span class=\"ls6e ws87\"> 50.0<span class=\"_ _4f\"/> </span><span class=\"_ _2e9\">Myanmar5</span><span class=\"_ _64\"> </span><span class=\"ff1f\"> 40.0 - 45.0 <span class=\"_ _184\"> </span></span> 40.0 - 50.<span class=\"_ _1\"/>0<span class=\"_ _2e9\"> </span>Caribbean<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">Barbados1</span><span class=\"_ _24f\"> </span><span class=\"ff1f ls1c ws22\"> 6<span class=\"_ _4f\"/>0.0 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span>T<span class=\"_ _0\"/>rinidad &amp; T<span class=\"_ _0\"/><span class=\"_ _2e9\">obago1</span><span class=\"_ _6c\"> </span><span class=\"ff1f\"> 65.0 - 70.<span class=\"_ _1\"/>0 <span class=\"_ _5d\"> </span><span class=\"ff20\"> -<span class=\"_ _2e9\"> </span></span></span>Other joint operations<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">Angel6</span><span class=\"_ _157\"> </span><span class=\"ff1f ls1c ws22\"> 20.0 <span class=\"_ _5d\"> </span></span> -<span class=\"_ _2e9\"> </span><span class=\"_ _2e9\">Bonaparte Basin6</span><span class=\"_ _109\"> </span><span class=\"ff1f\"> 21.0 <span class=\"_ _ab\"> </span></span> -<span class=\"_ _2e9\"> </span>1. <span class=\"_ _29\"> </span>Increase in int<span class=\"_ _1\"/>erests due t<span class=\"_ _1\"/>o the merger with BHPP on 1 June 2022.<span class=\"_ _2e9\"> </span>2.  No longer recognised as joint oper<span class=\"_ _1\"/>ations as the Group\u2019<span class=\"_ _1\"/>s interes<span class=\"_ _1\"/>t increased to<span class=\"_ _2e9\"> </span>100% due to the mer<span class=\"_ _1\"/>ger with BHPP on 1 June 2022.<span class=\"_ _2e9\"> </span>3.  The Carnarvon Basin and Scarbor<span class=\"_ _1\"/>ough explor<span class=\"_ _1\"/>ation and ev<span class=\"_ _1\"/>aluation assets which<span class=\"_ _2e9\"> </span>wer<span class=\"_ _1\"/>e pre<span class=\"_ _1\"/>viously present<span class=\"_ _1\"/>ed on the same line, hav<span class=\"_ _1\"/>e been separat<span class=\"_ _1\"/>ely presented in<span class=\"_ _2e9\"> </span>2022. The 2021 Gr<span class=\"_ _1\"/>oup inter<span class=\"_ _1\"/>ests hav<span class=\"_ _1\"/>e been reclas<span class=\"_ _1\"/>si\ufb01ed to be present<span class=\"_ _1\"/>ed on the<span class=\"_ _2e9\"> </span>same basis.<span class=\"_ _2e9\"> </span>4.  T<span class=\"_ _1\"/>he Group\u2019<span class=\"_ _1\"/>s interes<span class=\"_ _1\"/>t decreased to 22.5% upon f<span class=\"_ _1\"/>arm-down of int<span class=\"_ _1\"/>erest in June<span class=\"_ _2e9\"> </span>2022.<span class=\"_ _2e9\"> </span>5.  The Group r<span class=\"_ _1\"/>elinquished permits AD-1 and AD-8 in 20<span class=\"_ _1\"/>22. Formalities are pending.<span class=\"_ _2e9\"> </span>6.  Carbon Captur<span class=\"_ _1\"/>e Stor<span class=\"_ _1\"/>age titles G-10-<span class=\"_ _1\"/>AP and G-<span class=\"_ _1\"/>7<span class=\"_ _1\"/>-AP gr<span class=\"_ _1\"/>anted t<span class=\"_ _1\"/>o the Group in<span class=\"_ _2e9\"> </span>2022.<span class=\"_ _2e9\"> </span>The principal activities of the joint operations are exploration,<span class=\"_ _2e9\"> </span>development and production of hydrocarbons.<span class=\"_ _2e9\"> </span>K<span class=\"_ _1\"/>ey es<span class=\"_ _1\"/>timates and judgements<span class=\"_ _2e9\"> </span>Ac<span class=\"_ _1\"/>counting for int<span class=\"_ _1\"/>eres<span class=\"_ _1\"/>ts in other entities<span class=\"_ _2e9\"> </span>Judgement is required in assessing the level of control obtained in a<span class=\"_ _2e9\"> </span>transaction to acquire an interest in another entity; depending upon<span class=\"_ _2e9\"> </span>the facts and circumstances in each case, Woodside may obtain<span class=\"_ _2e9\"> </span>control, joint control or signi\ufb01cant in\ufb02uence over the entity or<span class=\"_ _2e9\"> </span>arrangement. Judgement is applied when determining the relevant<span class=\"_ _2e9\"> </span>activities of a project and if joint control is held over it.<span class=\"_ _2e9\"> </span>Relevant activities include, but are not limited to, work program<span class=\"_ _2e9\"> </span>and budget approval, investment decision approval, voting rights in<span class=\"_ _2e9\"> </span>joint operating committees, amendments to permits and changes<span class=\"_ _2e9\"> </span>to joint arrangement participant holdings. Transactions which<span class=\"_ _2e9\"> </span>give Woodside control of a business are business combinations.<span class=\"_ _2e9\"> </span>If Woodside obtains joint control of an arrangement, judgement<span class=\"_ _2e9\"> </span>is also required to assess whether the arrangement is a joint<span class=\"_ _2e9\"> </span>operation or a joint venture. If Woodside has neither control nor<span class=\"_ _2e9\"> </span>joint control, it may be in a position to exercise signi\ufb01cant in\ufb02uence<span class=\"_ _2e9\"> </span>over the entity, which is then accounted for as an associate.<span class=\"_ _2e9\"> </span>Recognition and measurement<span class=\"_ _2e9\"> </span>Joint arrangements are arrangements in which two or more<span class=\"_ _2e9\"> </span>parties have joint control. Joint control is the contractual agreed<span class=\"_ _2e9\"> </span>sharing of control of the arrangement which exists only when<span class=\"_ _2e9\"> </span>decisions about the relevant activities require unanimous<span class=\"_ _2e9\"> </span>consent of the parties sharing control. Joint arrangements are<span class=\"_ _2e9\"> </span>classi\ufb01ed as either a joint operation or joint venture, based<span class=\"_ _2e9\"> </span>on the rights and obligations arising from the contractual<span class=\"_ _2e9\"> </span>obligations between the parties to the arrangement.<span class=\"_ _2e9\"> </span>To the extent the joint arrangement provides the Group with<span class=\"_ _2e9\"> </span>rights to the individual assets and obligations arising from<span class=\"_ _2e9\"> </span>the joint arrangement, the arrangement is classi\ufb01ed as a joint<span class=\"_ _2e9\"> </span>operation, and as such the Group recognises its:<span class=\"_ _2e9\"> </span>\u2022 <span class=\"_ _4b\"> </span>assets, including its share of any assets held jointly;<span class=\"_ _2e9\"> </span>\u2022 <span class=\"_ _4b\"> </span>liabilities, including its share of any liabilities incurred jointly;<span class=\"_ _2e9\"> </span>\u2022 <span class=\"_ _4b\"> </span>revenue from the sale of its share of the output arising from the joint operation;<span class=\"_ _2e9\"> </span>\u2022 <span class=\"_ _4b\"> </span>share of revenue from the sale of the output by the joint<span class=\"_ _2e9\"> </span>operation; and<span class=\"_ _2e9\"> </span>\u2022 <span class=\"_ _4b\"> </span>expenses, including its share of any expenses incurred jointly.<span class=\"_ _2e9\"> </span>To the extent the joint arrangement provides the Group with<span class=\"_ _2e9\"> </span>rights to the net assets of the arrangement, the investment is classi\ufb01ed as a joint venture and accounted for using the equity method.<span class=\"_ _2e9\"> </span>Joint arrangements acquired which are deemed to be carrying on a business are accounted for applying the principles of AASB 3/ IFRS 3 <span class=\"ff23\">Business Combinations</span>. Joint arrangements<span class=\"_ _2e9\"> </span>which are not deemed to be carrying on a business are treated<span class=\"_ _2e9\"> </span>as asset acquisitions.",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfJointVenturesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-816": {
   "value": "Key estimates and judgements  Accounting for interests in other entities  Judgement is required in assessing the level of control obtained in a  transaction to acquire an interest in another entity; depending upon  the facts and circumstances in each case, Woodside may obtain  control, joint control or signi\ufb01cant in\ufb02uence over the entity or  arrangement. Judgement is applied when determining the relevant  activities of a project and if joint control is held over it.  Relevant activities include, but are not limited to, work program  and budget approval, investment decision approval, voting rights in  joint operating committees, amendments to permits and changes  to joint arrangement participant holdings. Transactions which  give Woodside control of a business are business combinations.  If Woodside obtains joint control of an arrangement, judgement  is also required to assess whether the arrangement is a joint  operation or a joint venture. If Woodside has neither control nor  joint control, it may be in a position to exercise signi\ufb01cant in\ufb02uence  over the entity, which is then accounted for as an associate. Recognition and measurement  Joint arrangements are arrangements in which two or more  parties have joint control. Joint control is the contractual agreed  sharing of control of the arrangement which exists only when  decisions about the relevant activities require unanimous  consent of the parties sharing control. Joint arrangements are  classi\ufb01ed as either a joint operation or joint venture, based  on the rights and obligations arising from the contractual  obligations between the parties to the arrangement.  To the extent the joint arrangement provides the Group with  rights to the individual assets and obligations arising from  the joint arrangement, the arrangement is classi\ufb01ed as a joint  operation, and as such the Group recognises its: \u2022  assets, including its share of any assets held jointly;  \u2022  liabilities, including its share of any liabilities incurred jointly;  \u2022  revenue from the sale of its share of the output arising from  the joint operation;  \u2022  share of revenue from the sale of the output by the joint  operation; and  \u2022  expenses, including its share of any expenses incurred jointly.  To the extent the joint arrangement provides the Group with  rights to the net assets of the arrangement, the investment  is classi\ufb01ed as a joint venture and accounted for using the  equity method. Joint arrangements acquired which are deemed to be carrying  on a business are accounted for applying the principles of  AASB 3/ IFRS 3 Business Combinations. Joint arrangements  which are not deemed to be carrying on a business are treated  as asset acquisitions. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfAccountingPolicyForInvestmentsInJointVentures",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-787": {
   "value": "E.7  Parent entity information 2022 2021 US$m US$m Woodside Energy Group Ltd: Current assets 312  456 Non-current assets 34,734  10,037 Current liabilities (1,530) (357) Non-current liabilities (481) (300) Net assets 33,035  9,836 Issued and fully paid shares 29,001  9,409 Reserved shares (38) (30) Employee bene\ufb01ts reserve 150  112 Foreign currency translation reserve 296  296 Distributable pro\ufb01ts reserve 3,541  58 Retained earnings 85  (9) Total shareholders equity 33,035  9,836 Pro\ufb01t of parent entity 6,665  18 Total comprehensive income of parent entity 6,665  18 Guarantees Woodside Energy Group Ltd and Woodside Energy Ltd (a subsidiary company) are parties to a Deed of Cross Guarantee as disclosed in Note E.8. The effect of the Deed is that Woodside Energy Group Ltd has guaranteed to pay any de\ufb01ciency in the event of winding up of the subsidiary company under certain provisions of the Corporations Act 2001. The subsidiary company has also given a similar guarantee in the event that Woodside Energy Group Ltd is wound up. Woodside Energy Group Ltd has guaranteed the discharge by a subsidiary company of its \ufb01nancial obligations under debt facilities disclosed in Note C.2. Woodside Energy Group Ltd has guaranteed certain obligations of subsidiaries to unrelated parties on behalf of their performance in contracts. No liabilities are expected to arise from these guarantees. ",
   "dimensions": {
    "concept": "woodsideenergygroupltd:DisclosureOfParentEntityInformation",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-788": {
   "value": "E.8 Subsidiaries (a) Subsidiaries Name of entity Notes Ultimate Parent Entity Woodside Energy Group Ltd (1,2,3) Subsidiaries  Company name  Woodside Energy Ltd (2,3,4)     Woodside Browse Pty Ltd (2,4)     Woodside Burrup Pty Ltd (2,4)       Burrup Facilities Company Pty Ltd (5)      Burrup Train 1 Pty Ltd (5)      Pluto LNG Pty Ltd (5)      Woodside Burrup Train 2 A Pty Ltd (2,4)      Woodside Burrup Train 2 B Pty Ltd (2,4)      Woodside Energy (LNG Fuels and Power) Pty Ltd (2,4)      Woodside Energy (Domestic Gas) Pty Ltd (2,4)    Woodside Energy (Algeria) Pty Ltd (2,4)     Woodside Energy Australia Asia Holdings Pte Ltd y (4)    Woodside Energy Holdings International Pty Ltd (2,4) Name of entity Notes      Woodside Energy International (Canada) Limited t (4)      Woodside Energy (Canada LNG) Limited t (4)     Woodside Energy (Canada PTP) Limited t (4)         KM LNG Operating General Partnership t (9)       KM LNG Operating Ltd t (4)     Woodside Energy Holdings Pty Ltd (2,4)       Woodside Energy Holdings (USA) Inc q (4)        Woodside Energy (USA) Inc q (4)      Gryphon Exploration Company q (4)      PT Woodside Energy Indonesia   (6)      Woodside Energy (Cameroon) SARL n (4)      Woodside Energy (Gabon) Pty Ltd (2,4)       Woodside Energy (Indonesia) Pty Ltd (2,4)      Woodside Energy (Indonesia II) Pty Ltd (2,4)      Woodside Energy (Malaysia) Pty Ltd (2,4)      Woodside Energy (Ireland) Pty Ltd (2,4)       Woodside Energy (Korea) Pte Ltd y (4)      Woodside Energy (Korea II) Pte Ltd y (4)      Woodside Energy (Myanmar) Pte Ltd y (4)      Woodside Energy (Morocco) Pty Ltd (2,4)       Woodside Energy (New Zealand) Limited z (4)      Woodside Energy (New Zealand 55794) Limited z (4)      Woodside Energy (Peru) Pty Ltd (2,4)       Woodside Energy (Senegal) Pty Ltd (2,4)       Woodside Energy (Tanzania) Limited 3 (7)    Woodside Energy Holdings II Pty Ltd (2,4)      Woodside Power Pty Ltd (2,4)        Woodside Power (Generation) Pty Ltd (2,4)    Woodside Energy Holdings (South America) Pty Ltd (2,4)       Woodside Energia (Brasil) Apoio Administrativo Ltda l  (8)    Woodside Energy Holdings (UK) Pty Ltd  (2,4)       Woodside Energy (UK) Limited p (4)        Woodside Energy Finance (UK) Limited p (4)        Woodside Energy (Congo) Limited p (4)        Woodside Energy (Bulgaria) Limited p (4)        Woodside Energy Holdings (Senegal) Limited p (4)       Woodside Energy (Senegal) B.V.  (4)         Woodside Energy (France) SAS \u00a3 (4)        Woodside Energy Iberia S.A. \u00ba (4)        Woodside Energy (N.A.) Ltd p (4)      Woodside Energy Services (Qingdao) Co Ltd   (4)    Woodside Energy Julimar Pty Ltd (2,4)     Woodside Energy (Norway) Pty Ltd (2,4)     Woodside Energy Technologies Pty Ltd (2,4,14)       Woodside Technology Solutions Pty Ltd (2,4)    Woodside Energy Scarborough Pty Ltd (2,4)    Woodside Energy Carbon Holdings Pty Ltd (2,4)      Woodside Energy Carbon (Assets) Pty Ltd (2,4)      Woodside Energy Carbon (Services) Pty Ltd (2,4)      Woodside Energy (Financial Advisory Services) Pty Ltd (2,4)    Woodside Energy Trading Singapore Pte Ltd y (4)      WelCap Insurance Pte Ltd y (4)      Woodside Energy Shipping Singapore Pte Ltd y (4)     Metasource Pty Ltd (2,4)   Mermaid Sound Port and Marine Services Pty Ltd (2,4)  Woodside Finance Limited (2,4)   Woodside Petroleum (Timor Sea 19) Pty Ltd (2,4)   Woodside Petroleum (Timor Sea 20) Pty Ltd (2,4)   Woodside Petroleum Holdings Pty Ltd (2,4,15)   Woodside Energy Global Holdings Pty Ltd (2,4) E.8  Subsidiaries (cont.) Name of entity Notes    Woodside Energy Global Pty Ltd  (2,4)    Perdido Mexico Pipeline Holdings, S.A. de C.V.   (10)      Perdido Mexico Pipeline, S. de R.L. de C.V.   (10)    Woodside Energy Investments Pty Ltd   (2,4)      Woodside Energia Brasil Investimentos Ltda. l (11)        Woodside Energia Brasil Explora\u00e7\u00e3o e Produ\u00e7\u00e3o Ltda. l (4)      Woodside Energy (Great Britain) Limited p (4)    Woodside Energy (North West Shelf) Pty Ltd  (2,4)    Woodside Energy (Trinidad) Holdings Ltd   (4)      Woodside Energy (Trinidad-3A) Ltd   (4)    Woodside Energy USA Operations Inc q (12)      Hamilton Brothers Petroleum Corporation q (4)      Hamilton Oil Company LLC q (4)      Woodside Energy Boliviana Inc. q (4)      Woodside Energy (North America) LLC q (4)      Woodside Energy (Americas) Inc. q (4)    Woodside Energy (GOM) Inc. q (4)      Woodside Energy Hawaii Inc. q (4,16)      Woodside Energy Resources Inc. q (4)        Woodside Energy Holdings (Resources) Inc. q (4)     Woodside Energy USA Services Inc. q (4)     Woodside Energy Marketing Inc. q (4)     Woodside Energy (Deepwater) Inc. q (4,17)      Woodside Energy (Foreign Exploration Holdings) LLC q (4)        Woodside Energy (Trinidad Block 3) Limited p (4)        Woodside Energy (Trinidad Block 6) Limited p (4)        Woodside Energy (Trinidad Block 5) Limited p (4)        Woodside Energy (Trinidad Block 7) Limited p (4)        Woodside Energy (Trinidad Block 14) Limited p (4)        Woodside Energy (Trinidad Block 23A) Limited p (4)        Woodside Energy (Trinidad Block 23B) Limited p (4)        Woodside Energy (Trinidad Block 28) Limited p (4)        Woodside Energy (Trinidad Block 29) Limited p (4)    Woodside Energy (Bimshire) Limited p (4)        Woodside Energy (South Africa 3B/4B) Limited p (4)    Woodside Energy (Egypt) Limited p (4)        Woodside Energy (Carlisle Bay) Limited p (4)    Woodside Energy (Mexico) Limited p (4)     Woodside Energ\u00eda Servicios Administrativos,      S. de R.L. de C.V.   (13)          Woodside Energ\u00eda Servicios de M\u00e9xico, S. de R.L. de C.V.   (13)     Woodside Energy (Mexico Holdings) LLC q (4)          Operaciones Conjuntas, S. de R.L. de C.V.   (13)          Woodside Energ\u00eda Holdings de M\u00e9xico, S. de R.L. de C.V.   (13)      Woodside Petr\u00f3leo Operaciones de M\u00e9xico,        S. de R.L. de C.V.   (13)    Woodside Energy (Australia) Pty Ltd  (2,4)    Woodside Energy (International Exploration) Pty Ltd  (2,4)    Woodside Energy (Bass Strait) Pty Ltd  (2,4)    Woodside Energy (Victoria) Pty Ltd  (2,4)    Woodside Energy Holdings LLC q (4)    Woodside Energy (Trinidad-2C) Ltd t (4)    Woodside Energy (Canada) Corporation t (4) 1.  Woodside Energy Group Ltd, previously Woodside Petroleum Ltd, is the ultimate holding company and the head entity within the tax consolidated group. 2.  These companies were members of the Australian tax consolidated group at 31 December 2022. 3.  Woodside Energy Group Ltd and Woodside Energy Ltd are parties to a Deed of Cross Guarantee. 4.  All subsidiaries are wholly owned except those referred to in Notes 5 to 13. 5.  Kansai Electric Power Australia Pty Ltd and Tokyo Gas Pluto Pty Ltd each hold a 5% interest in the shares of these subsidiaries. These subsidiaries are controlled. 6.  PT Woodside Energy Indonesia was incorporated on 27 April 2022. As at 31 December 2022, Woodside Energy Holdings Pty Ltd held a 99% interest in the shares of PT Woodside Energy Indonesia. Woodside Energy Ltd held the remaining 1% interest. 7.  As at 31 December 2022, Woodside Energy Holdings Pty Ltd held >99.99% interest in the shares of Woodside Energy (Tanzania) Limited and Woodside Energy Ltd held the remaining interest. 8.  As at 31 December 2022, Woodside Energy Holdings (South America) Pty Ltd held >99.99% interest in the shares of Woodside Energia (Brasil) Apoio Administrativo Ltda and Woodside Energy Ltd held the remaining interest. 9.  As at 31 December 2022, Woodside Energy International (Canada) Limited and Woodside Energy (Canada LNG) Limited were the general partners of the KM LNG Operating General Partnership holding a 99.99% and 0.01% partnership interest, respectively. 10. As at 31 December 2022, Woodside Energy Global Holdings Pty Ltd held a 99.99% interest in shares of Perdido Mexico Pipeline Holdings, S.A. de C.V. and Perdido Mexico Pipeline, S. de R.L. de C.V. Woodside Energy Investments Pty Ltd held the remaining 0.01% interest. 11.  As at 31 December 2022, Woodside Energy Investments Pty Ltd held a 99.97% interest in shares of Woodside Energia Brasil Investimentos Ltda. Woodside Energy Global Holdings Pty Ltd held the remaining 0.03% interest. 12. As at 31 December 2022, Woodside Energy Global Holdings Pty Ltd held 90% voting interest and 37.67% interest in shares of Woodside Energy USA Operations Inc. Woodside Energy Holdings LLC held the remaining 10% voting interest and 62.33% interest in shares. 13. As at 31 December 2022, Woodside Energy (Mexico) Limited held a 99% interest in shares of Woodside Energ\u00eda Servicios Administrativos, S. de R.L. de C.V., Woodside Energ\u00eda Servicios de M\u00e9xico, S. de R.L. de C.V., Operaciones Conjuntas, S. de R.L. de C.V. and Woodside Petr\u00f3leo Operaciones de M\u00e9xico, S. de R.L. de C.V. and 99.99% interest in shares of Woodside Energ\u00eda Holdings de M\u00e9xico, S. de R.L. de C.V. Woodside Energy (Mexico Holdings) LLC held the remaining 0.01%-1% interest. 14. Woodside Energy Technologies Pty Ltd owns 28.50% in Blue Ocean Seismic Services Limited which is accounted for as an investment in associate. 15. Woodside Energy (North West Shelf) Pty Ltd and Woodside Petroleum Holdings Pty Ltd owns 16.67% in International Gas Transportation Company Limited respectively. This investment has been accounted for as an investment in associate. 16. Woodside Energy Hawaii Inc owns 14.96% in Iwilei District Participating Parties LLC which is accounted for as an investment in associate. 17. Woodside Energy (Deepwater) Inc owns 25% in Caesar Oil Pipeline Company LLC, 22% in Cleopatra Gas Gathering Company LLC and 10% in Marine Well Containment Company LLC. These investments are accounted for as an investment in associate. All subsidiaries were incorporated in Australia unless identi\ufb01ed with one of the following symbols:   Bermuda l Brazil n Cameroon t Canada   China \u00a3 France   Mexico   Indonesia   The Netherlands   R. of Trinidad and Tobago z New Zealand   Saint Lucia y Singapore \u00ba  Spain 3 Tanzania p United  Kingdom q United  States Classi\ufb01cation Subsidiaries are all the entities over which the Group has the power over the investee such that the Group is able to direct the relevant activities, has exposure, or rights, to variable returns from its involvement with the investee and has the ability to use its power over the investee to affect the amount of the investor\u2019s returns. E.8  Subsidiaries (cont.) (b) Subsidiaries with material non-controlling interests The Group has two Australian subsidiaries with material non-controlling interests (NCI). Name of entity Principal place of business % held by NCI Burrup Facilities Company Pty Ltd Australia 10% Burrup Train 1 Pty Ltd Australia 10% The NCI in both subsidiaries is 10% held by the same parties (refer to Note E.8(a) footnote 5 for details). The summarised \ufb01nancial information (including consolidation adjustments but before intercompany eliminations) of subsidiaries with material NCI is as follows: 2022 2021 2020 US$m   US$m   US$m Burrup Facilities Company Pty Ltd Current assets  567  518  425 Non-current assets  5,047  5,038  5,224 Current liabilities  (68) (71) (51) Non-current liabilities  (528) (528) (571) Net assets  5,018  4,957  5,027 Accumulated balance of NCI   502  496  503 Revenue   889  858  859 Pro\ufb01t   489  328  318 Pro\ufb01t allocated to NCI   49  33  32 Dividends paid to NCI   (43) (40) (32) Operating   601  633  652 Investing   (45) (111) (69) Financing   (556) (522) (583) Net increase/(decrease) in cash and cash equivalents   -  - - Burrup Train 1 Pty Ltd Current assets   429  435  372 Non-current assets   2,900  2,915  3,081 Current liabilities   (119) (110) (103) Non-current liabilities   (325) (345) (385) Net assets   2,885  2,895  2,965 Accumulated balance of NCI   289  290  297 Revenue   1,471  1,421  1,423 Pro\ufb01t   282  200  208 Pro\ufb01t allocated to NCI   28  20  21 Dividends paid to NCI   (29) (27) (13) Operating   391  393  473 Investing   (55) (4) (2) Financing   (336) (389) (471) Net increase/(decrease) in cash and cash equivalents   -  - - (c) Deed of Cross Guarantee and Closed Group Woodside Energy Group Ltd and Woodside Energy Ltd are parties to a Deed of Cross Guarantee under which each company guarantees the debts of the other. The two entities represent a Closed Group. The consolidated income statement and consolidated statement of \ufb01nancial position of the members of the Closed Group are set out below: 2022 2021 US$m US$m Closed Group Consolidated Income Statement and Statement of Retained Earnings Pro\ufb01t before tax 6,586  1,599 Tax expense (314) (50) Pro\ufb01t after tax 6,272  1,549 Retained earnings at the beginning of the \ufb01nancial year 1,660  111 Other comprehensive income 1  - Transfer of retained earnings to distributable pro\ufb01ts reserve (5,553) - Dividends (1,018) - Retained earnings at the end of the \ufb01nancial year 1,362  1,660 Closed Group Consolidated Statement of Financial Position Current assets Cash and cash equivalents 116  160 Receivables 675  948 Inventories 56  47 Other \ufb01nancial assets 653  173 Other assets 21  22 Total current assets 1,521  1,350 Non-current assets Receivables 2,171  476 Other \ufb01nancial assets 57,844  36,432 Exploration and evaluation assets 28  31 Oil and gas properties 2,424  2,930 Deferred tax assets 421  579 Lease assets 315  319 Other assets 67  13 Total non-current assets 63,270  40,780 Total assets 64,791  42,130 Current liabilities Payables 483  186 Other \ufb01nancial liabilities 675  409 Provisions 328  320 Tax payable 1,556  357 Lease liabilities 36  23 Other liabilities 38  34 Total current liabilities 3,116  1,329 Non-current liabilities Payables 25,524  27,104 Other \ufb01nancial liabilities 68  153 Provisions 1,121  1,179 Lease liabilities 325  360 Other liabilities 11  15 Total non-current liabilities 27,049  28,811 Total liabilities 30,165  30,140 Net assets 34,626  11,990 Equity Issued and fully paid shares 29,001  9,409 Reserved shares (38) (30) Other reserves 4,301  951 Retained earnings 1,362  1,660 Total equity 34,626  11,990",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfSignificantInvestmentsInSubsidiariesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-817": {
   "value": "(b) New and amended accounting standards and  interpretations issued but not yet effective A number of new standards, amendments of standards and  interpretations have recently been issued but are not yet  effective and have not been adopted by the Group as at the  \ufb01nancial reporting date. The Group has reviewed these standards and interpretations  and has determined that none of the new or amended standards  will signi\ufb01cantly affect the Group\u2019s accounting policies, \ufb01nancial  position or performance. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfExpectedImpactOfInitialApplicationOfNewStandardsOrInterpretations",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-789": {
   "value": "(b) New and amended accounting standards and  interpretations issued but not yet effective A number of new standards, amendments of standards and  interpretations have recently been issued but are not yet  effective and have not been adopted by the Group as at the  \ufb01nancial reporting date. The Group has reviewed these standards and interpretations  and has determined that none of the new or amended standards  will signi\ufb01cantly affect the Group\u2019s accounting policies, \ufb01nancial  position or performance. (c) New and amended accounting standards and  interpretations adopted As of 1 January 2022, the Group adopted AASB 2020-3  Amendments to AASs \u2013 Annual Improvements 2018-2020 and  Other Amendments including:  \u2022  Amendments to AASB 3 Reference to the Conceptual  Framework  \u2022  Amendments to AASB 9 Fees in the \u201810 per cent\u2019 Test for  Derecognition of Financial Liabilities  \u2022  Amendments to AASB 137 Onerous Contracts \u2013 Costs of  Ful\ufb01lling a Contract  These amendments did not impact the \ufb01nancial statements  of the Group.  A number of other new standards are also effective from  1 January 2022 but they do not have a material effect on the  Group\u2019s \ufb01nancial statements. ",
   "dimensions": {
    "concept": "ifrs-full:DisclosureOfChangesInAccountingPoliciesExplanatory",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  },
  "fact-818": {
   "value": "(c) New and amended accounting standards and  interpretations adopted As of 1 January 2022, the Group adopted AASB 2020-3  Amendments to AASs \u2013 Annual Improvements 2018-2020 and  Other Amendments including:  \u2022  Amendments to AASB 3 Reference to the Conceptual  Framework  \u2022  Amendments to AASB 9 Fees in the \u201810 per cent\u2019 Test for  Derecognition of Financial Liabilities  \u2022  Amendments to AASB 137 Onerous Contracts \u2013 Costs of  Ful\ufb01lling a Contract  These amendments did not impact the \ufb01nancial statements  of the Group.  A number of other new standards are also effective from  1 January 2022 but they do not have a material effect on the  Group\u2019s \ufb01nancial statements. ",
   "dimensions": {
    "concept": "ifrs-full:DescriptionOfInitialApplicationOfStandardsOrInterpretations",
    "language": "en",
    "entity": "scheme:2549005ZC5RXAOO7FH41",
    "period": "2022-01-01T00:00:00/2023-01-01T00:00:00"
   }
  }
 }
}